S10

Presupuesto
Presupuesto "REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS - CCERAOCRO, CHUMBES - CCACCAMARCA, PAJONAL - CALLEJON, DISTRITO DE OCROS,
PROVINCIA DE HUAMANGA - AYACUCHO"

Cliente MUNICIPALIDAD DISTRITAL DE OCROS fecha 7/13/2023


Lugar AYACUCHO - HUAMANGA - OCROS
Item Descripción Und. Metrado Precio (S/.) Parcial (S/.)
01 OBRAS PROVISIONALES 29,019.88
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40M X 3.60M. und 1.00 745.59 745.59
01.02 CAMPAMENTO PROVISIONAL DE LA OBRA und 1.00 12,121.54 12,121.54
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 6,745.50 6,745.50
01.04 EQUIPOS DE PROTECCION INDIVIDUAL und 75.00 125.43 9,407.25
02 MEJORAMIENTO DE CARRETERA 5,862,979.80
02.01 OBRAS PRELIMINARES 24,802.25
02.01.01 ROCE Y LIMPIEZA HA 15.36 680.14 10,446.95
02.01.02 TRAZO Y REPLANTEO KM 15.36 934.59 14,355.30
02.02 MOVIMIENTO DE TIERRAS 3,149,554.60
02.02.01 CORTE DE MATERIAL SUELTO RENDIMIENTO=810 M3/DIA m3 92,106.82 8.81 811,461.08
02.02.02 CORTE ROCA SUELTA m3 3,864.63 71.74 277,248.56
02.02.03 CONFORMACION DE TERRAPLENES m3 7,097.59 15.36 109,018.98
02.02.04 PERFILADO Y COMPACTADO EN ZONA DE CORTE m2 66,107.70 3.86 255,175.72
02.02.05 ELIMINACION DE MATERIAL EXCEDENTE A BOTADERO>1 KM m3 119,964.31 13.61 1,632,714.26
02.02.06 HABILITACION DE BOTADEROS m2 9,600.00 6.66 63,936.00
02.03 AFIRMADO 1,174,609.93
02.03.01 EXTRACCION DE MATERIAL m3 14,745.60 7.63 112,508.93
02.03.02 ZARANDEO Y APILAMIENTO DE MATERIAL m3 14,745.60 6.48 95,551.49
02.03.03 CARGUIO RENDIMIENTO= 810 M3/DIA m3 14,745.60 5.53 81,543.17
02.03.04 TRANSPORTE DE MATERIAL SELECIONADO D>1KM m3 14,745.60 34.56 509,607.94
02.03.05 EXTENDIDO, RIEGO Y COMPACTADO DE MAT. DE AFIRMADO E=0.20M m2 61,440.00 6.11 375,398.40
02.04 CUNETAS 70,518.75
02.04.01 CONFORMACION DE CUNETAS EN MATERIAL NO CLASIFICADO m 18,805.00 3.75 70,518.75
02.05 OBRAS DE ARTE Y DRENAJE 1,443,494.27
02.05.01 ALCANTARILLAS TIPO TMC 36" (36 UND.) 683,624.67
02.05.01.01 TRABAJOS PRELIMINARES 2,555.76
02.05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 756.14 1.26 952.74
02.05.01.01.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 756.14 2.12 1,603.02
02.05.01.02 MOVIMIENTO DE TIERRAS 123,503.12
02.05.01.02.01 EXCAVACION MASIVA C/ MAQUINARIA m3 792.76 16.44 13,032.97
02.05.01.02.02 NIVELACION INTERIOR APISONADO MANUAL m2 529.78 4.06 2,150.91
02.05.01.02.03 RELLENO PARA ESTRUCTURAS CON MATERIAL DE RELLENO m3 598.70 142.16 85,111.19
02.05.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 990.95 23.42 23,208.05
02.05.01.03 CONCRETO SIMPLE 442,927.39
02.05.01.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 1,020.52 55.21 56,342.91
02.05.01.03.02 CONCRETO F'C= 210 KG/CM2. EN MUROS m3 119.50 551.23 65,871.99
02.05.01.03.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg 1,321.49 8.97 11,853.77
02.05.01.03.04 CONCRETO PARA ALIVIADEROS EMBOQUILLADO F'C=175 KG/CM2 + 25% P. m3 584.86 528.09 308,858.72
02.05.01.04 ALCANTARILLAS TIPO TMC 114,638.40
02.05.01.04.01 ALCANTARILLA TMC 0=36" C=12 m 180.00 636.88 114,638.40
02.05.02 BADENES (08 UND.) 171,394.81
02.05.02.01 TRABAJOS PRELIMINARES 1,216.80
02.05.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 360.00 1.26 453.60
02.05.02.01.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 360.00 2.12 763.20
02.05.02.02 MOVIMIENTO DE TIERRAS 58,363.07
02.05.02.02.01 EXCAVACION PARA ESTRUCTURA Y DRENAJE EN SECO m3 162.00 49.35 7,994.70
02.05.02.02.02 NIVELACION INTERIOR APISONADO MANUAL m2 360.00 4.06 1,461.60
02.05.02.02.03 RELLENO PARA ESTRUCTURAS CON MATERIALDE RELLENO m3 312.00 142.16 44,353.92
02.05.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 194.40 23.42 4,552.85
02.05.02.03 CONCRETO SIMPLE 111,814.94
02.05.02.03.01 CONCRETO f´c= 175 kg/cm2 + 30% PG. m3 211.20 418.41 88,368.19
02.05.02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 139.20 55.21 7,685.23
02.05.02.03.03 ALIVIADERO DE PIEDRA EMBOQUILLADA m3 48.00 316.47 15,190.56
02.05.02.03.04 JUNTAS DILATACION m 72.00 7.93 570.96
02.05.03 PUENTE TIPO LOSA DE L=9.4M. PROG 0+323 KM 293,780.18
02.05.03.01 TRABAJOS PRELIMINARES 1,222.32
02.05.03.01.01 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR und 2.00 394.30 788.60
02.05.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 157.20 1.77 278.24
02.05.03.01.03 TRAZO Y REPLANTEO DURANTE LA OBRA KM 0.16 971.75 155.48
02.05.03.02 MOVIMIENTO DE TIERRAS 37,436.14
02.05.03.02.01 EXCAVACION PARA ESTRUCTURA EN MATERIAL SUELTO, EN SECO m3 136.72 19.15 2,618.19
02.05.03.02.02 EXCAVACION PARA ESTRUCTURA EN MATERIAL SUELTO, EN AGUA m3 259.55 20.21 5,245.51
02.05.03.02.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 105.96 20.87 2,211.39
02.05.03.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 532.68 51.20 27,273.22
02.05.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 3.75 23.42 87.83
02.05.03.03 OBRAS DE CONCRETO SIMPLE 176,312.61
02.05.03.03.01 ZAPATAS 35,364.52
02.05.03.03.01.01 SOLADO PARA ZAPATAS CONCRETO F'C=140 KG/CM2 E=10CM. m2 97.65 40.44 3,948.97
02.05.03.03.01.02 ENCOFRADO Y DESENCOFRADO PARA ZAPATAS m2 35.06 46.73 1,638.35
02.05.03.03.01.03 CONCRETO F'C= 175 KG/CM2.+ 30% P.G. EN ZAPATAS m3 58.59 508.23 29,777.20
02.05.03.03.02 ESTRIBOS 140,948.09
02.05.03.03.02.01 ENCOFRADO Y DESENCOFRADO DE ESTRIBOS m2 363.37 109.11 39,647.30
02.05.03.03.02.02 CONCRETO F'C= 175 KG/CM2.+ 30% P.G. EN ESTRIBOS m3 198.52 510.28 101,300.79
02.05.03.04 OBRAS DE CONCRETO ARMADO 63,746.29
02.05.03.04.01 ENCOFRADO Y DESENCOFRADO DE LOSA Y VIGA m2 49.92 182.25 9,097.92
02.05.03.04.02 CONCRETO F'C=280 KG/CM2 EN LOSA m3 26.54 666.25 17,682.28
S10

Presupuesto
Presupuesto "REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS - CCERAOCRO, CHUMBES - CCACCAMARCA, PAJONAL - CALLEJON, DISTRITO DE OCROS,
PROVINCIA DE HUAMANGA - AYACUCHO"

Cliente MUNICIPALIDAD DISTRITAL DE OCROS fecha 7/13/2023


Lugar AYACUCHO - HUAMANGA - OCROS
Item Descripción Und. Metrado Precio (S/.) Parcial (S/.)
02.05.03.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg 4,048.86 9.13 36,966.09
02.05.03.05 CARPINTERIA METALICA 11,183.42
02.05.03.05.01 COLOCACIÓN DE BARANDAS METÁLICAS m 19.20 582.47 11,183.42
02.05.03.06 SISTEMA DE EVACUACION PLUVIAL 200.22
02.05.03.06.01 TUBOS DE DRENAJE D=3" L=0.50 M und 6.00 33.37 200.22
02.05.03.07 VARIOS 3,679.18
02.05.03.07.01 NEOPRENE E=1", 0.50Mx5.20M. und 2.00 1,434.50 2,869.00
02.05.03.07.02 JUNTAS DE TEKCNOPOR m2 5.00 97.52 487.60
02.05.03.07.03 LIMPIEZA FINAL DE OBRA m2 217.96 1.48 322.58
02.05.04 PUENTE TIPO LOSA DE L=9.4M. PROG 8+860 KM 294,694.61
02.05.04.01 TRABAJOS PRELIMINARES 1,222.32
02.05.04.01.01 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR und 2.00 394.30 788.60
02.05.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 157.20 1.77 278.24
02.05.04.01.03 TRAZO Y REPLANTEO DURANTE LA OBRA KM 0.16 971.75 155.48
02.05.04.02 MOVIMIENTO DE TIERRAS 38,350.57
02.05.04.02.01 EXCAVACION PARA ESTRUCTURA EN MATERIAL SUELTO, EN SECO m3 160.12 19.15 3,066.30
02.05.04.02.02 EXCAVACION PARA ESTRUCTURA EN MATERIAL SUELTO, EN AGUA m3 294.65 20.21 5,954.88
02.05.04.02.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 105.96 20.87 2,211.39
02.05.04.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 466.14 51.20 23,866.37
02.05.04.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 138.84 23.42 3,251.63
02.05.04.03 OBRAS DE CONCRETO SIMPLE 176,312.61
02.05.04.03.01 ZAPATAS
02.05.04.03.02 SOLADO PARA ZAPATAS CONCRETO F'C=140 KG/CM2 E=10CM. m2 97.65 40.44 3,948.97
02.05.04.03.03 ENCOFRADO Y DESENCOFRADO PARA ZAPATAS m2 35.06 46.73 1,638.35
02.05.04.03.04 CONCRETO F'C= 175 KG/CM2.+ 30% P.G. EN ZAPATAS m3 58.59 508.23 29,777.20
02.05.04.03.05 ESTRIBOS
02.05.04.03.06 ENCOFRADO Y DESENCOFRADO DE ESTRIBOS m2 363.37 109.11 39,647.30
02.05.04.03.07 CONCRETO F'C= 175 KG/CM2.+ 30% P.G. EN ESTRIBOS m3 198.52 510.28 101,300.79
02.05.04.04 OBRAS DE CONCRETO ARMADO 63,746.29
02.05.04.04.01 ENCOFRADO Y DESENCOFRADO DE LOSA Y VIGA m2 49.92 182.25 9,097.92
02.05.04.04.02 CONCRETO F'C=280 KG/CM2 EN LOSA m3 26.54 666.25 17,682.28
02.05.04.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg 4,048.86 9.13 36,966.09
02.05.04.05 CARPINTERIA METALICA 11,183.42
02.05.04.05.01 COLOCACIÓN DE BARANDAS METÁLICAS m 19.20 582.47 11,183.42
02.05.04.06 SISTEMA DE EVACUACION PLUVIAL 200.22
02.05.04.06.01 TUBOS DE DRENAJE D=3" L=0.50 M und 6.00 33.37 200.22
02.05.04.07 VARIOS 3,679.18
02.05.04.07.01 NEOPRENE E=1", 0.50Mx5.20M. und 2.00 1,434.50 2,869.00
02.05.04.07.02 JUNTAS DE TEKCNOPOR m2 5.00 97.52 487.60
02.05.04.07.03 LIMPIEZA FINAL DE OBRA m2 217.96 1.48 322.58
03 SEÑALIZACION Y SEGURIDAD VIAL 37,824.98
03.01 SEÑAL PREVENTIVA und 34.00 640.19 21,766.46
03.02 SEÑAL INFORMATIVA und 10.00 1,038.86 10,388.60
03.03 HITOS KILOMETRICOS und 16.00 354.37 5,669.92
04 MITIGACION AMBIENTAL 36,102.40
04.01 READECUACION AMBIENTAL DE CANTERAS HA 4.00 6,386.08 25,544.32
04.02 READECUACION AMBIENTAL DE CAMPAMENTO Y PATIO DE MAQUINAS HA 2.00 5,279.04 10,558.08
05 CAPACITACION 10,200.00
05.01 PROGRAMA DE CAPACITACION Y EDUCACION AMBIENTAL GLB 1.00 10,200.00 10,200.00
06 OTROS 43,848.38
06.01 FLETE TERRESTRE TRAMO I GLB 1.00 43,288.38 43,288.38
06.02 PLACA RECORDATORIA und 1.00 560.00 560.00
COSTO DIRECTO 6,019,975.44
GASTOS GENERALES - 481,598.04
UTILIDAD - 421,398.28
SUB PRESUPUESTO - 6,922,971.76
IGV - 1,246,134.92
PRESUPUESTO BASE - 8,169,106.67
SUPERVISION - 326,764.27
TOTAL PRESUPUESTO 8,495,870.94
RESUMEN DE PLANILLA DE METRADOS
TRAMO OCROS - CCERAOCRO
Proyecto : “MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS
– CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO DE
AYACUCHO”
Propietario : MUNICIPALIDAD DISTRITAL DE OCROS
Fecha : JULIO 2022
Especialidad: VIAL
Item Descripción Und. Metrado
01 TRAMO I OCROS CCERAOCRO
01 OBRAS PROVISIONALES -
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40M X 3.60M. und 1.00
01.02 CAMPAMENTO PROVISIONAL DE LA OBRA und 1.00
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00
01.04 EQUIPOS DE PROTECCION INDIVIDUAL und 75.00
02 MEJORAMIENTO DE CARRETERA
02.01 OBRAS PRELIMINARES
02.01.01 ROCE Y LIMPIEZA HA 15.36
02.01.02 TRAZO Y REPLANTEO KM 15.36
02.02 MOVIMIENTO DE TIERRAS
02.02.01 CORTE DE MATERIAL SUELTO RENDIMIENTO=810 M3/DIA m3 92,106.82
02.02.02 CORTE ROCA SUELTA m3 3,864.63
02.02.03 CONFORMACION DE TERRAPLENES m3 7,097.59
02.02.04 PERFILADO Y COMPACTADO EN ZONA DE CORTE m2 64,672.00
02.02.05 ELIMINACION DE MATERIAL EXCEDENTE A BOTADERO>1 KM m3 119,964.31
02.02.06 HABILITACION DE BOTADEROS m2 9,600.00
02.03 AFIRMADO
02.03.01 EXTRACCION DE MATERIAL m3 14,438.40
02.03.02 ZARANDEO Y APILAMIENTO DE MATERIAL m3 14,438.40
02.03.03 CARGUIO RENDIMIENTO= 810 M3/DIA m3 14,438.40
02.03.04 TRANSPORTE DE MATERIAL SELECIONADO D>1KM m3 14,438.40
02.03.05 EXTENDIDO, RIEGO Y COMPACTADO DE MAT. DE AFIRMADO E=0.20M m2 60,160.00
02.04 CUNETAS
02.04.01 CONFORMACION DE CUNETAS EN MATERIAL NO CLASIFICADO m 18,805.00
02.05 OBRAS DE ARTE Y DRENAJE
02.05.01 ALCANTARILLAS TIPO TMC 36" (36 UND.)
02.05.01.01 TRABAJOS PRELIMINARES
02.05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 756.14
02.05.01.01.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 756.14
02.05.01.02 MOVIMIENTO DE TIERRAS
02.05.01.02.01 EXCAVACION MASIVA C/ MAQUINARIA m3 792.76
02.05.01.02.02 NIVELACION INTERIOR APISONADO MANUAL m2 529.78
02.05.01.02.03 RELLENO PARA ESTRUCTURAS CON MATERIAL DE RELLENO m3 598.70
02.05.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 990.95
02.05.01.03 CONCRETO SIMPLE
02.05.01.03.01 CONCRETO F'C= 210 KG/CM2. EN MUROS m3 1,020.52
02.05.01.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 119.50
02.05.01.03.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg 1,321.49
02.05.01.03.04 CONCRETO PARA ALIVIADEROS EMBOQUILLADO F'C=175 KG/CM2 + 25% P.M. m3 584.86
02.05.01.04 ALCANTARILLAS TIPO TMC
02.05.01.04.01 ALCANTARILLA TMC 0=36" C=12 m 180.00
02.05.02 BADENES (08 UND.)
02.05.02.01 TRABAJOS PRELIMINARES
02.05.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 360.00
02.05.02.01.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 360.00
02.05.02.02 MOVIMIENTO DE TIERRAS
02.05.02.02.01 EXCAVACION PARA ESTRUCTURA Y DRENAJE EN SECO m3 162.00
02.05.02.02.02 NIVELACION INTERIOR APISONADO MANUAL m2 360.00
02.05.02.02.03 RELLENO PARA ESTRUCTURAS CON MATERIALDE RELLENO m3 312.00
02.05.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 194.40
02.05.02.03 CONCRETO SIMPLE
02.05.02.03.01 CONCRETO f´c= 175 kg/cm2 + 30% PG. m3 211.20
02.05.02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 139.20
02.05.02.03.03 ALIVIADERO DE PIEDRA EMBOQUILLADA m3 48.00
02.05.02.03.04 JUNTAS DILATACION m 72.00
02.05.03 PUENTE TIPO LOSA DE L=9.4M. PROG 0+323 KM
RESUMEN DE PLANILLA DE METRADOS
TRAMO OCROS - CCERAOCRO
Proyecto : “MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS
– CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO DE
AYACUCHO”
Propietario : MUNICIPALIDAD DISTRITAL DE OCROS
Fecha : JULIO 2022
Especialidad: VIAL
Item Descripción Und. Metrado
02.05.03.01 TRABAJOS PRELIMINARES
02.05.03.01.01 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR und 2.00
02.05.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 220.91
02.05.03.01.03 TRAZO Y REPLANTEO DURANTE LA OBRA KM 220.91
02.05.03.02 MOVIMIENTO DE TIERRAS
02.05.03.02.01 EXCAVACION PARA ESTRUCTURA EN MATERIAL SUELTO, EN SECO m3 136.72
02.05.03.02.02 EXCAVACION PARA ESTRUCTURA EN MATERIAL SUELTO, EN AGUA m3 259.55
02.05.03.02.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 105.96
02.05.03.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 532.68
02.05.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 3.75
02.05.03.03 OBRAS DE CONCRETO SIMPLE
02.05.03.03.01 ZAPATAS
02.05.03.03.01.01 SOLADO PARA ZAPATAS CONCRETO F'C=140 KG/CM2 E=10CM. m2 97.65
02.05.03.03.01.02 ENCOFRADO Y DESENCOFRADO PARA ZAPATAS m2 35.06
02.05.03.03.01.03 CONCRETO F'C= 175 KG/CM2.+ 30% P.G. EN ZAPATAS m3 58.59
02.05.03.03.02 ESTRIBOS
02.05.03.03.02.01 ENCOFRADO Y DESENCOFRADO DE ESTRIBOS m2 363.37
02.05.03.03.02.02 CONCRETO F'C= 175 KG/CM2.+ 30% P.G. EN ESTRIBOS m3 198.52
02.05.03.04 OBRAS DE CONCRETO ARMADO
02.05.03.04.01 ENCOFRADO Y DESENCOFRADO DE LOSA Y VIGA m2 49.92
02.05.03.04.02 CONCRETO F'C=280 KG/CM2 EN LOSA m3 26.54
02.05.03.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg 4,048.86
02.05.03.05 CARPINTERIA METALICA
02.05.03.05.01 COLOCACIÓN DE BARANDAS METÁLICAS m 19.20
02.05.03.06 SISTEMA DE EVACUACION PLUVIAL
02.05.03.06.01 TUBOS DE DRENAJE D=3" L=0.50 M und 6.00
02.05.03.07 VARIOS
02.05.03.07.01 NEOPRENE E=1", 0.50Mx5.20M. und 2.00
02.05.03.07.02 JUNTAS DE TEKCNOPOR m2 5.00
02.05.03.07.03 LIMPIEZA FINAL DE OBRA m2 217.96
02.05.04 PUENTE TIPO LOSA DE L=9.4M. PROG 8+860 KM
02.05.04.01 TRABAJOS PRELIMINARES
02.05.04.01.01 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR und #N/A
02.05.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 #N/A
02.05.04.01.03 TRAZO Y REPLANTEO DURANTE LA OBRA KM #N/A
02.05.04.02 MOVIMIENTO DE TIERRAS
02.05.04.02.01 EXCAVACION PARA ESTRUCTURA EN MATERIAL SUELTO, EN SECO m3 #N/A
02.05.04.02.02 EXCAVACION PARA ESTRUCTURA EN MATERIAL SUELTO, EN AGUA m3 #N/A
02.05.04.02.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 #N/A
02.05.04.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 #N/A
02.05.04.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 #N/A
02.05.04.03 OBRAS DE CONCRETO SIMPLE
02.05.04.03.01 ZAPATAS
02.05.04.03.01.01 SOLADO PARA ZAPATAS CONCRETO F'C=140 KG/CM2 E=10CM. m2 #N/A
02.05.04.03.01.02 ENCOFRADO Y DESENCOFRADO PARA ZAPATAS m2 #N/A
02.05.04.03.01.03 CONCRETO F'C= 175 KG/CM2.+ 30% P.G. EN ZAPATAS m3 #N/A
02.05.04.03.02 ESTRIBOS
02.05.04.03.02.01 ENCOFRADO Y DESENCOFRADO DE ESTRIBOS m2 #N/A
02.05.04.03.02.02 CONCRETO F'C= 175 KG/CM2.+ 30% P.G. EN ESTRIBOS m3 #N/A
02.05.04.04 OBRAS DE CONCRETO ARMADO
02.05.04.04.01 ENCOFRADO Y DESENCOFRADO DE LOSA Y VIGA m2 #N/A
02.05.04.04.02 CONCRETO F'C=280 KG/CM2 EN LOSA m3 #N/A
02.05.04.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg #N/A
02.05.04.05 CARPINTERIA METALICA
02.05.04.05.01 COLOCACIÓN DE BARANDAS METÁLICAS m #N/A
02.05.04.06 SISTEMA DE EVACUACION PLUVIAL
02.05.04.06.01 TUBOS DE DRENAJE D=3" L=0.50 M und #N/A
RESUMEN DE PLANILLA DE METRADOS
TRAMO OCROS - CCERAOCRO
Proyecto : “MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS
– CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO DE
AYACUCHO”
Propietario : MUNICIPALIDAD DISTRITAL DE OCROS
Fecha : JULIO 2022
Especialidad: VIAL
Item Descripción Und. Metrado
02.05.04.07 VARIOS
02.05.04.07.01 NEOPRENE E=1", 0.50Mx5.20M. und #N/A
02.05.04.07.02 JUNTAS DE TEKCNOPOR m2 #N/A
02.05.04.07.03 LIMPIEZA FINAL DE OBRA m2 #N/A
03 SEÑALIZACION Y SEGURIDAD VIAL
03.01 SEÑAL PREVENTIVA und 2.00
03.02 SEÑAL INFORMATIVA und 2.00
03.03 HITOS KILOMETRICOS und 2.00
04 MITIGACION AMBIENTAL
04.01 READECUACION AMBIENTAL DE CANTERAS HA 4.00
04.02 READECUACION AMBIENTAL DE CAMPAMENTO Y PATIO DE MAQUINAS HA 2.00
05 CAPACITACION
05.01 PROGRAMA DE CAPACITACION Y EDUCACION AMBIENTAL GLB 1.00
06 OTROS
06.01 FLETE TERRESTRE TRAMO I GLB 1.00
06.02 PLACA RECORDATORIA und 1.00
PLANILLA DE METRADOS TRAMO I
Proyecto : “MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA
DE HUAMANGA, DEL DEPARTAMENTO DE AYACUCHO”
Propietario : MUNICIPALIDAD DISTRITAL DE OCROS
Fecha : July-2023
Especialidad: VIAL
DIMENSIONES

Veces
Elem.

Nº de
Simil.
Und
ITEM DESCRIPCIÓN Sub total Total
Largo Ancho Alto
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40M X 3.60M. und 1.00 1.00 1.00
01.02 CAMPAMENTO PROVISIONAL DE LA OBRA und 1.00 1.00 1.00
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 1.00 1.00

01.04 EQUIPOS DE PROTECCION INDIVIDUAL und 75.00 75.00 75.00


02 MEJORAMIENTO DE CARRETERA
02.01 OBRAS PRELIMINARES
02.01.01 ROCE Y LIMPIEZA HA 15.36
15.36 1.00 15.36

02.01.02 TRAZO Y REPLANTEO KM 15.36


15.36 1.00 15.36

02.02 MOVIMIENTO DE TIERRAS


02.02.01 CORTE DE MATERIAL SUELTO RENDIMIENTO=810 M3/DIA m3 92,106.82
ver cuadro de explanaciones 92,106.82 92,106.82

02.02.02 CORTE ROCA SUELTA m3 3,864.63


ver cuadro de explanaciones 3,864.63 3,864.63

02.02.03 CONFORMACION DE TERRAPLENES m3 7,097.59


ver cuadro de explanaciones 7,097.59 7,097.59

02.02.04 PERFILADO Y COMPACTADO EN ZONA DE CORTE m2 64,672.00


15,040.00 4.30 64,672.00

02.02.05 ELIMINACION DE MATERIAL EXCEDENTE A BOTADERO>1 KM m3 119,964.31


95,971.45 espj. 1.25 119,964.31

02.02.06 HABILITACION DE BOTADEROS m2 9,600.00


60.00 160.00 9,600.00

02.03 AFIRMADO
02.03.01 EXTRACCION DE MATERIAL m3 facor 14,438.40
15,040.00 4.00 0.20 1.20 14,438.40

02.03.02 ZARANDEO Y APILAMIENTO DE MATERIAL m3 14,438.40


15,040.00 4.00 0.20 1.20 14,438.40

02.03.03 CARGUIO RENDIMIENTO= 810 M3/DIA m3 14,438.40


15,040.00 4.00 0.20 1.20 14,438.40

02.03.04 TRANSPORTE DE MATERIAL SELECIONADO D>1KM m3 14,438.40


15,040.00 4.00 0.20 1.20 14,438.40

02.03.05 EXTENDIDO, RIEGO Y COMPACTADO DE MAT. DE AFIRMADO E=0.20M m2 60,160.00


15,040.00 4.00 60,160.00
02.02.06 HABILITACION DE BOTADEROS m2
02.04 CUNETAS
02.04.01 CONFORMACION DE CUNETAS EN MATERIAL NO CLASIFICADO m 18,805.00
lado derecho 12,000.00 12,000.00
lado izquierdo 6,805.00 6,805.00
02.05 OBRAS DE ARTE Y DRENAJE
02.05.01 ALCANTARILLAS TIPO TMC 36" (36 UND.) 36.00
02.05.01.01 TRABAJOS PRELIMINARES
02.05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 756.14
1.00 7.12 2.95 21.00

02.05.01.01.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 756.14


1.00 7.12 2.95 21.00

02.05.01.02 MOVIMIENTO DE TIERRAS


02.05.01.02.01 EXCAVACION MASIVA C/ MAQUINARIA m3 792.76
Aleta de entrada 2.00 0.90 0.20 1.50 0.54
Aliviadero de entrada 1.00 1.95 0.70 1.00 1.37
Uña de entrada 1.00 2.65 0.20 0.30 0.16
Cuerpo principal 1.00 5.67 1.80 1.80 18.37
Uña de salida 1.00 2.65 0.20 0.30 0.16
Aleta de salida 2.00 0.90 0.20 1.50 0.54
Aliviadero de salida 1.00 1.95 0.70 0.65 0.89

02.05.01.02.02 NIVELACION INTERIOR APISONADO MANUAL m2 529.78


Aleta de entrada 2.00 0.90 0.20 0.36
Aliviadero de entrada 1.00 1.95 0.70 1.37
Uña de entrada 1.00 2.65 0.20 0.53
Cuerpo principal 1.00 5.67 1.80 10.21
Uña de salida 1.00 2.65 0.20 0.53
Aleta de salida 2.00 0.90 0.20 0.36
Aliviadero de salida 1.00 1.95 0.70 1.37

02.05.01.02.03 RELLENO PARA ESTRUCTURAS CON MATERIAL DE RELLENO m3 598.70


Relleno inferior de apoyo 1.20 5.27 1.80 0.30 3.41
Relleno adyacente al tubo 1.20 5.27 1.80 0.91 10.41
Seccion de la tuberia (área) -1.20 5.27 0.64 -4.02
Relleno superior 1.20 5.27 1.80 0.60 6.83

02.05.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 epj. 990.95


de la excavacion 792.76 1.25 990.95

02.05.01.03 CONCRETO SIMPLE


PLANILLA DE METRADOS TRAMO I
Proyecto : “MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA
DE HUAMANGA, DEL DEPARTAMENTO DE AYACUCHO”
Propietario : MUNICIPALIDAD DISTRITAL DE OCROS
Fecha : July-2023
Especialidad: VIAL
DIMENSIONES

Veces
Elem.

Nº de
Simil.
Und
ITEM DESCRIPCIÓN Sub total Total
Largo Ancho Alto
02.05.01.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 1,020.52

Aleta de entrada (exterior) 2.00 0.80 1.50 2.40

Aleta de entrada (interior) 2.00 1.00 1.50 3.00

Aleta de entrada (tapa) 2.00 0.20 1.20 0.48

Friso del aliviadero de entrada 1.00 2.65 0.20 0.53

Muros de entrada y salida (exterior) 2.00 1.80 2.10 7.56

Muros de entrada y salida (interior) 2.00 1.80 2.10 7.56

Seccion de la tuberia (área) -2.00 0.64 -1.27

Muros de entrada y salida (tapa) 4.00 0.20 2.10 1.68

Aleta de salida (exterior) 2.00 0.80 1.50 2.40

Aleta de salida (interior) 2.00 1.00 1.50 3.00

Aleta de salida (tapa) 2.00 0.20 1.20 0.48

Friso del aliviadero de salida 1.00 2.65 0.20 0.53

02.05.01.03.02 CONCRETO F'C= 210 KG/CM2. EN MUROS m3 119.50

Aleta de entrada 2.00 1.10 0.20 2.00 0.88

Uña del aliviadero de entrada 1.00 2.65 0.20 0.30 0.16

Muro de entrada y salida 2.00 1.80 0.20 2.30 1.66

Seccion de la tuberia (area) -2.00 0.64 0.20 -0.25

Aleta de salida 2.00 0.90 0.20 2.00 0.72

Uña del aliviadero de salida 1.00 2.65 0.20 0.30 0.16

02.05.01.03.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg ø n°veces largo peso parcial 1,321.49

a 3/8" 14.00 1.80 0.57 14.36

b 3/8" 8.00 0.55 0.57 2.51

c 3/8" 8.00 0.45 0.57 2.05

d 3/8" 4.00 2.10 0.57 4.79

e 3/8" 4.00 2.10 0.57 4.79

f 3/8" 4.00 1.15 0.57 2.62

g 3/8" 4.00 0.95 0.57 2.17

h 3/8" 2.00 0.90 0.57 1.03

i 3/8" 2.00 0.30 0.57 0.34

j 3/8" 4.00 0.35 0.57 0.80

k 3/8" 4.00 0.55 0.57 1.25

02.05.01.03.04 CONCRETO PARA ALIVIADEROS EMBOQUILLADO F'C=175 KG/CM2 + 25% P.M. m3 584.86
Aliviadero de entrada y salida 1.00 16.25 1.00 16.25

02.05.01.04 ALCANTARILLAS TIPO TMC


02.05.01.04.01 ALCANTARILLA TMC 0=36" C=12 m 180.00
1.00 5.00 5.00

02.05.02 BADENES (08 UND.) 8.00


02.05.02.01 TRABAJOS PRELIMINARES
02.05.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 360.00
7.50 6.00 45.00

02.05.02.01.02 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 360.00


7.50 6.00 45.00
02.05.02.02 MOVIMIENTO DE TIERRAS
02.05.02.02.01 EXCAVACION PARA ESTRUCTURA Y DRENAJE EN SECO m3 162.00
1.00 7.50 6.00 0.45 20.25

02.05.02.02.02 NIVELACION INTERIOR APISONADO MANUAL m2 360.00


7.50 6.00 45.00

02.05.02.02.03 RELLENO PARA ESTRUCTURAS CON MATERIALDE RELLENO m3 312.00


1.00 6.50 6.00 39.00

02.05.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 194.40


de la excavacion 1.00 162.00 1.20 194.40

02.05.02.03 CONCRETO SIMPLE


02.05.02.03.01 CONCRETO f´c= 175 kg/cm2 + 30% PG. m3 211.20
8.00 8.25 0.40 26.40

02.05.02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 139.20


perimetro del baden y juntas de dilatacion 10.00 area 1.74 17.40

02.05.02.03.03 ALIVIADERO DE PIEDRA EMBOQUILLADA m3 48.00


2.00 7.50 0.40 6.00

02.05.02.03.04 JUNTAS DILATACION m 72.00


PLANILLA DE METRADOS TRAMO I
Proyecto : “MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA
DE HUAMANGA, DEL DEPARTAMENTO DE AYACUCHO”
Propietario : MUNICIPALIDAD DISTRITAL DE OCROS
Fecha : July-2023
Especialidad: VIAL
DIMENSIONES

Veces
Elem.

Nº de
Simil.
Und
ITEM DESCRIPCIÓN Sub total Total
Largo Ancho Alto
1.00 9.00 9.00

02.05.03 PUENTE TIPO LOSA DE L=9.4M. PROG 0+323 KM


02.05.03.01 TRABAJOS PRELIMINARES
02.05.03.01.01 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR und 2.00
2.00 2.00
02.05.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 220.91

15.95 13.85 220.91


02.05.03.01.03 TRAZO Y REPLANTEO DURANTE LA OBRA KM 220.91
15.95 13.85 220.91
02.05.03.02 MOVIMIENTO DE TIERRAS
02.05.03.02.01 EXCAVACION PARA ESTRUCTURA EN MATERIAL SUELTO, EN SECO m3 136.72
136.72 136.72
2.00 1.50 8.75 5.50 144.38
02.05.03.02.02 EXCAVACION PARA ESTRUCTURA EN MATERIAL SUELTO, EN AGUA m3 259.55
259.55 259.55
2.00 15.00 10.48 1.15 361.56
02.05.03.02.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 105.96
105.96 105.96
2.00 15.00 2.50 75.00

02.05.03.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 532.68


532.68 532.68
2.25 LARGO= 4.10 AREA= 20.94 193.14
02.05.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 3.75
3.75
3.75
243.42
243.42
02.05.03.03 OBRAS DE CONCRETO SIMPLE
02.05.03.03.01 ZAPATAS
02.05.03.03.01.01 SOLADO PARA ZAPATAS CONCRETO F'C=140 KG/CM2 E=10CM. m2 97.65
97.65 97.65
EJE PANTALLA 2.00 4.18 5.85 48.85
ESTRIBOS 4.00 AREA= 12.20 48.80
02.05.03.03.01.02 ENCOFRADO Y DESENCOFRADO PARA ZAPATAS m2 35.06
35.06 35.06
PANTALLA 2.00 5.85 0.70 8.19
ESTRIBOS 2.00 PER= 15.86 0.70 22.20
LATERAL ALA DE ESTRIBOS 2.00 4.18 2.00 16.70

02.05.03.03.01.03 CONCRETO F'C= 175 KG/CM2.+ 30% P.G. EN ZAPATAS m3 58.59


58.59 58.59
PANTALLA 2.00 4.18 5.85 0.60 29.31
ESTRIBOS 4.00 AREA= 12.20 0.60 29.28

02.05.03.03.02 ESTRIBOS
02.05.03.03.02.01 ENCOFRADO Y DESENCOFRADO DE ESTRIBOS m2 363.37
363.37 363.37
CARA LATERAL ALA DE ESTRIBO 2.00 AREA= 28.28 2.00 113.12
TAPAS EN ALA DE ESTRIBO 2.00 0.60 4.60 5.52
PANTALLA PRINCIPAL 2.00 6.60 5.85 77.22
02.05.03.03.02.02 CONCRETO F'C= 175 KG/CM2.+ 30% P.G. EN ESTRIBOS m3 198.52
198.52 198.52
PANTALLA PRINCIPAL 2.00 9.62 5.85 112.55
ALAS DE ESTRIBOS 4.00 0.60 23.88 57.31

02.05.03.04 OBRAS DE CONCRETO ARMADO

02.05.03.04.01 ENCOFRADO Y DESENCOFRADO DE LOSA Y VIGA m2 49.92


49.92 49.92
02.05.03.04.02 CONCRETO F'C=280 KG/CM2 EN LOSA m3 26.54
26.54 26.54
02.05.03.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg 4,048.86
4,048.86 4,048.86
02.05.03.05 CARPINTERIA METALICA
02.05.03.05.01 COLOCACIÓN DE BARANDAS METÁLICAS m 19.20
19.20 19.20
02.05.03.06 SISTEMA DE EVACUACION PLUVIAL
02.05.03.06.01 TUBOS DE DRENAJE D=3" L=0.50 M und 6.00
6.00 6.00
02.05.03.07 VARIOS
02.05.03.07.01 NEOPRENE E=1", 0.50Mx5.20M. und 2.00
2.00 2.00
02.05.03.07.02 JUNTAS DE TEKCNOPOR m2 5.00
5.00 5.00
02.05.03.07.03 LIMPIEZA FINAL DE OBRA m2 217.96
217.96 217.96
02.05.04 PUENTE TIPO LOSA DE L=9.6M. PROG 8+860 KM
02.05.03.01 TRABAJOS PRELIMINARES
02.05.03.01.01 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR und 2.00
2.00 2.00
02.05.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 204.16

2.00 15.95 6.40 204.16


02.05.03.01.03 TRAZO Y REPLANTEO DURANTE LA OBRA KM 0.20
0.20 0.20
02.05.03.02 MOVIMIENTO DE TIERRAS
02.05.03.02.01 EXCAVACION PARA ESTRUCTURA EN MATERIAL SUELTO, EN SECO m3 92.29
1.00 6.40 area= 14.42 92.29
02.05.03.02.02 EXCAVACION PARA ESTRUCTURA EN MATERIAL SUELTO, EN AGUA m3 92.80
1.00 6.40 area= 14.50 92.80
02.05.03.02.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 75.00
2.00 15.00 area= 2.50 75.00
PLANILLA DE METRADOS TRAMO I
Proyecto : “MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA
DE HUAMANGA, DEL DEPARTAMENTO DE AYACUCHO”
Propietario : MUNICIPALIDAD DISTRITAL DE OCROS
Fecha : July-2023
Especialidad: VIAL
DIMENSIONES

Veces
Elem.

Nº de
Simil.
Und
ITEM DESCRIPCIÓN Sub total Total
Largo Ancho Alto

02.05.03.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 266.69


1.00 LARGO= 6.40 AREA= 20.73 132.67
1.00 LARGO= 6.40 AREA= 20.94 134.02

02.05.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 -102.00

esp -81.60
1.25

02.05.03.03 OBRAS DE CONCRETO SIMPLE


02.05.03.03.01 ZAPATAS
02.05.03.03.01.01 SOLADO PARA ZAPATAS CONCRETO F'C=140 KG/CM2 E=10CM. m2 100.05

EJE PANTALLA 2.00 4.18 5.85 48.85


ESTRIBOS 4.00 AREA= 12.80 51.20
02.05.03.03.01.02 ENCOFRADO Y DESENCOFRADO PARA ZAPATAS m2 57.53

PANTALLA 2.00 5.85 0.60 7.02


ESTRIBOS 4.00 PER= 10.96 0.80 35.07
LATERAL ALA DE ESTRIBOS 2.00 7.72 15.44

02.05.03.03.01.03 CONCRETO F'C= 175 KG/CM2.+ 30% P.G. EN ZAPATAS m3 204.95

PANTALLA 2.00 AREA= 25.30 0.60 30.36


ESTRIBOS 2.00 AREA= 13.64 6.40 174.59

02.05.03.03.02 ESTRIBOS
02.05.03.03.02.01 ENCOFRADO Y DESENCOFRADO DE ESTRIBOS m2 170.42

CARA LATERAL ALA DE ESTRIBO 2.00 AREA= 21.92 2.00 87.68


TAPAS EN ALA DE ESTRIBO 2.00 0.60 4.60 5.52
PANTALLA PRINCIPAL 2.00 6.60 5.85 77.22
02.05.03.03.02.02 CONCRETO F'C= 175 KG/CM2.+ 30% P.G. EN ESTRIBOS m3 169.87

PANTALLA PRINCIPAL 2.00 9.62 5.85 112.55


ALAS DE ESTRIBOS 4.00 0.60 23.88 57.31

02.05.03.04 OBRAS DE CONCRETO ARMADO

02.05.03.04.01 ENCOFRADO Y DESENCOFRADO DE LOSA Y VIGA m2 95.92


95.92 95.92
02.05.03.04.02 CONCRETO F'C=280 KG/CM2 EN LOSA m3 26.54
26.54 26.54
02.05.03.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg 4,293.76
4,293.76 4,293.76
02.05.03.05 CARPINTERIA METALICA
02.05.03.05.01 COLOCACIÓN DE BARANDAS METÁLICAS m 88.80
88.80 88.80
02.05.03.06 SISTEMA DE EVACUACION PLUVIAL
02.05.03.06.01 TUBOS DE DRENAJE D=3" L=0.50 M und 10.00
10.00 10.00
02.05.03.07 VARIOS
02.05.03.07.01 NEOPRENE E=1", 0.50Mx5.20M. und 2.00
2.00 2.00
02.05.03.07.02 JUNTAS DE TEKCNOPOR m2 5.00
5.00 5.00
02.05.03.07.03 LIMPIEZA FINAL DE OBRA m2 204.16
204.16 204.16
03 SEÑALIZACION Y SEGURIDAD VIAL
03.01 SEÑAL PREVENTIVA und 2.00
2.00 2.00
03.02 SEÑAL INFORMATIVA und 2.00
2.00 2.00
03.03 HITOS KILOMETRICOS und 2.00
2.00 2.00
04 MITIGACION AMBIENTAL
04.01 READECUACION AMBIENTAL DE CANTERAS HA 4.00
4.00 4.00
04.02 READECUACION AMBIENTAL DE CAMPAMENTO Y PATIO DE MAQUINAS HA 2.00
2.00 2.00
05 CAPACITACION
05.01 PROGRAMA DE CAPACITACION Y EDUCACION AMBIENTAL GLB 1.00
1.00 1.00
06 OTROS
06.01 FLETE TERRESTRE TRAMO I GLB 1.00
1.00 1.00
06.02 PLACA RECORDATORIA und 1.00
1.00 1.00
METRADOS DE ACERO - PUENTE TIPO LO
PROYECTO:

FECHA: JULIO - 2023

ACERO FY=4200kg/cm2
ACERO FY= 4200 KG/CM2: BUZONES
N°. DE
DESCRIPCION DISEÑO DE FIERRO CANT. Ø LONGITUD
ELEMENTOS
1.- Puente

Acero longitudinal 5/8" 2 5/8" 6.4 5

Acero longitudinal 3/4" 2 3/4" 6.4 4

Acero longitudinal 1" 2 1" 6.4 2

estribos 3/8" 2 3/8" 2.35 62

Acero longitudinal 1/2" 2 3/8" 2.50 44

Acero transversall 3/8" 2 3/8" 6.40 8

Acero longitudinal 5/8" en la


1 3/8" 5.18 96
losa

Acero transversall 5/8" en la


1 3/8" 9.60 52
losa

Acero transversall 1" 1 1" 9.60 16

Acero transversall 1" 1 1" 4.60 32

Acero transversall 5/8" 1 5/8" 9.60 48

Peso en Kilogramo por metro lineal


Longitud total por diámetro en metros lineales
Total en kilogramos por diametro
- PUENTE TIPO LOSA

DISTRITO:
PROVINCIA:
DEPARTAMENTO:

LONGITUD POR DIAMTRO (ML)


1/4" 3/8" 1/2" 5/8" 3/4" 1"

64.00

51.20

25.60

291.40

220.00

102.40

497.28

499.20

153.60

147.20

460.80

0.25 0.56 1.02 1.60 2.26 3.98


0.00 393.80 220.00 1,521.28 51.20 326.40
0.00 220.53 224.40 2,434.05 115.71 1,299.07
TOTAL KG 4,293.76
TRAMO DE INTERVENCION
CODIGO DE TRAMOS
RUTA TIPO DE
PAVIMENTO
CODIGO RECORRIDO
TRAMO I OCROS -CCACASSPAMPA-URUBAMBA-CCERAOCRO TROCHA
TRAMO II CHUMBES -CCACCAMARCA TROCHA
TRAMO III PAJONAL - VACAHUASI-CUSI-CALLEJON TROCHA
INICIO FIN
TIPODE LONGITUD
INTERVENCION PROGRESIVAPROGRESIVA (KM)

SIN INTERVENCION 0+000.00 15+364.00 15.36


SIN INTERVENCION 0+000.00 7+196.00 7.20
SIN INTERVENCION 0+000.00 10+338.00 10.34
METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

0+000.00 0.00 1.33 1.23 0.00 0.00 0.00 0.00 100.00% 0.00% 0.00% 0.00 0.00 0.00
0+020.00 20.00 0.89 0.82 0.00 0.00 20.50 0.00 100.00% 0.00% 0.00% 20.50 0.00 0.00

0+040.00 20.00 1.10 1.02 0.12 0.09 18.40 1.44 100.00% 0.00% 0.00% 18.40 0.00 0.00

0+060.00 20.00 0.00 0.00 10.25 7.68 10.20 124.44 100.00% 0.00% 0.00% 10.20 0.00 0.00

0+080.00 20.00 0.00 0.00 0.72 0.54 0.00 131.64 100.00% 0.00% 0.00% 0.00 0.00 0.00
0+100.00 20.00 7.05 6.51 0.00 0.00 65.10 8.64 100.00% 0.00% 0.00% 65.10 0.00 0.00

0+120.00 20.00 7.54 6.96 0.00 0.00 134.70 0.00 100.00% 0.00% 0.00% 134.70 0.00 0.00

0+140.00 20.00 2.75 2.54 0.16 0.12 95.00 1.92 100.00% 0.00% 0.00% 95.00 0.00 0.00

0+160.00 20.00 3.19 2.94 0.00 0.00 54.80 1.92 100.00% 0.00% 0.00% 54.80 0.00 0.00

0+180.00 20.00 1.59 1.47 0.00 0.00 44.10 0.00 100.00% 0.00% 0.00% 44.10 0.00 0.00
0+200.00 20.00 2.75 2.54 0.10 0.07 40.10 1.20 100.00% 0.00% 0.00% 40.10 0.00 0.00

0+220.00 20.00 2.67 2.46 0.98 0.73 50.00 12.96 100.00% 0.00% 0.00% 50.00 0.00 0.00

0+240.00 20.00 2.51 2.32 0.00 0.00 47.80 11.76 100.00% 0.00% 0.00% 47.80 0.00 0.00

0+260.00 20.00 4.63 4.27 0.00 0.00 65.90 0.00 100.00% 0.00% 0.00% 65.90 0.00 0.00

0+280.00 20.00 7.36 6.79 0.00 0.00 110.60 0.00 100.00% 0.00% 0.00% 110.60 0.00 0.00
0+300.00 20.00 5.68 5.24 0.00 0.00 120.30 0.00 100.00% 0.00% 0.00% 120.30 0.00 0.00

0+320.00 20.00 1.66 1.53 0.06 0.05 67.70 0.72 100.00% 0.00% 0.00% 67.70 0.00 0.00

0+340.00 20.00 1.89 1.74 0.00 0.00 32.70 0.72 100.00% 0.00% 0.00% 32.70 0.00 0.00

0+360.00 20.00 3.37 3.11 0.01 0.01 48.50 0.12 100.00% 0.00% 0.00% 48.50 0.00 0.00
0+380.00 20.00 0.76 0.70 0.26 0.19 38.10 3.24 100.00% 0.00% 0.00% 38.10 0.00 0.00

EXPLANACIONES (2) 14 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

0+400.00 20.00 0.84 0.78 0.27 0.20 14.80 6.36 100.00% 0.00% 0.00% 14.80 0.00 0.00
0+420.00 20.00 0.44 0.41 0.51 0.38 11.90 9.36 100.00% 0.00% 0.00% 11.90 0.00 0.00

0+440.00 20.00 0.49 0.45 0.33 0.25 8.60 10.08 100.00% 0.00% 0.00% 8.60 0.00 0.00

0+460.00 20.00 5.52 5.10 0.00 0.00 55.50 3.96 100.00% 0.00% 0.00% 55.50 0.00 0.00

0+480.00 20.00 5.20 4.80 0.00 0.00 99.00 0.00 100.00% 0.00% 0.00% 99.00 0.00 0.00
0+500.00 20.00 2.63 2.43 0.00 0.00 72.30 0.00 100.00% 0.00% 0.00% 72.30 0.00 0.00

0+520.00 20.00 8.25 7.62 0.00 0.00 100.50 0.00 100.00% 0.00% 0.00% 100.50 0.00 0.00

0+540.00 20.00 16.25 15.00 0.00 0.00 226.20 0.00 100.00% 0.00% 0.00% 226.20 0.00 0.00

0+560.00 20.00 16.91 15.61 0.00 0.00 306.10 0.00 100.00% 0.00% 0.00% 306.10 0.00 0.00

0+580.00 20.00 16.65 15.37 0.00 0.00 309.80 0.00 100.00% 0.00% 0.00% 309.80 0.00 0.00
0+600.00 20.00 9.93 9.17 0.00 0.00 245.40 0.00 100.00% 0.00% 0.00% 245.40 0.00 0.00

0+620.00 20.00 0.00 0.00 2.40 1.80 91.70 28.80 100.00% 0.00% 0.00% 91.70 0.00 0.00

0+640.00 20.00 0.00 0.00 4.53 3.40 0.00 83.16 100.00% 0.00% 0.00% 0.00 0.00 0.00

0+660.00 20.00 0.95 0.88 0.92 0.69 8.80 65.40 100.00% 0.00% 0.00% 8.80 0.00 0.00

0+680.00 20.00 8.11 7.49 0.00 0.00 83.70 11.04 100.00% 0.00% 0.00% 83.70 0.00 0.00
0+700.00 20.00 11.93 11.01 0.00 0.00 185.00 0.00 100.00% 0.00% 0.00% 185.00 0.00 0.00

0+720.00 20.00 10.19 9.41 0.00 0.00 204.20 0.00 100.00% 0.00% 0.00% 204.20 0.00 0.00

0+740.00 20.00 8.68 8.01 0.00 0.00 174.20 0.00 100.00% 0.00% 0.00% 174.20 0.00 0.00

0+760.00 20.00 12.59 11.62 0.00 0.00 196.30 0.00 100.00% 0.00% 0.00% 196.30 0.00 0.00
0+780.00 20.00 8.81 8.13 0.00 0.00 197.50 0.00 100.00% 0.00% 0.00% 197.50 0.00 0.00

EXPLANACIONES (2) 15 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

0+800.00 20.00 3.34 3.08 0.00 0.00 112.10 0.00 100.00% 0.00% 0.00% 112.10 0.00 0.00
0+820.00 20.00 2.35 2.17 0.00 0.00 52.50 0.00 100.00% 0.00% 0.00% 52.50 0.00 0.00

0+840.00 20.00 4.08 3.77 0.00 0.00 59.40 0.00 100.00% 0.00% 0.00% 59.40 0.00 0.00

0+860.00 20.00 13.24 12.22 0.00 0.00 159.90 0.00 100.00% 0.00% 0.00% 159.90 0.00 0.00

0+880.00 20.00 1.91 1.76 0.00 0.00 139.80 0.00 100.00% 0.00% 0.00% 139.80 0.00 0.00
0+900.00 20.00 2.23 2.06 0.00 0.00 38.20 0.00 100.00% 0.00% 0.00% 38.20 0.00 0.00

0+920.00 20.00 4.31 3.98 0.00 0.00 60.40 0.00 100.00% 0.00% 0.00% 60.40 0.00 0.00

0+940.00 20.00 0.79 0.73 0.22 0.17 47.10 2.64 100.00% 0.00% 0.00% 47.10 0.00 0.00

0+960.00 20.00 1.14 1.05 0.01 0.01 17.80 2.76 100.00% 0.00% 0.00% 17.80 0.00 0.00

0+980.00 20.00 2.95 2.72 0.05 0.04 37.70 0.72 100.00% 0.00% 0.00% 37.70 0.00 0.00
1+000.00 20.00 5.36 4.95 0.00 0.00 76.70 0.60 100.00% 0.00% 0.00% 76.70 0.00 0.00

1+020.00 20.00 8.05 7.43 1.31 0.98 123.80 15.72 100.00% 0.00% 0.00% 123.80 0.00 0.00

1+040.00 20.00 6.49 5.99 0.00 0.00 134.20 15.72 100.00% 0.00% 0.00% 134.20 0.00 0.00

1+060.00 20.00 4.02 3.71 1.19 0.89 97.00 14.28 100.00% 0.00% 0.00% 97.00 0.00 0.00

1+080.00 20.00 2.07 1.91 2.33 1.75 56.20 42.24 100.00% 0.00% 0.00% 56.20 0.00 0.00
1+100.00 20.00 0.75 0.69 0.26 0.19 26.00 31.08 100.00% 0.00% 0.00% 26.00 0.00 0.00

1+120.00 20.00 3.16 2.92 0.00 0.00 36.10 3.12 100.00% 0.00% 0.00% 36.10 0.00 0.00

1+140.00 20.00 6.97 6.43 0.00 0.00 93.50 0.00 100.00% 0.00% 0.00% 93.50 0.00 0.00

1+160.00 20.00 8.22 7.59 0.00 0.00 140.20 0.00 100.00% 0.00% 0.00% 140.20 0.00 0.00
1+180.00 20.00 9.80 9.05 0.00 0.00 166.40 0.00 100.00% 0.00% 0.00% 166.40 0.00 0.00

EXPLANACIONES (2) 16 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

1+200.00 20.00 14.47 13.36 0.00 0.00 224.10 0.00 100.00% 0.00% 0.00% 224.10 0.00 0.00
1+220.00 20.00 7.61 7.03 0.00 0.00 203.90 0.00 100.00% 0.00% 0.00% 203.90 0.00 0.00

1+240.00 20.00 6.29 5.81 0.00 0.00 128.40 0.00 100.00% 0.00% 0.00% 128.40 0.00 0.00

1+260.00 20.00 6.73 6.21 0.00 0.00 120.20 0.00 100.00% 0.00% 0.00% 120.20 0.00 0.00

1+280.00 20.00 6.92 6.39 0.00 0.00 126.00 0.00 100.00% 0.00% 0.00% 126.00 0.00 0.00
1+300.00 20.00 6.10 5.63 0.00 0.00 120.20 0.00 100.00% 0.00% 0.00% 120.20 0.00 0.00

1+320.00 20.00 1.59 1.47 0.00 0.00 71.00 0.00 100.00% 0.00% 0.00% 71.00 0.00 0.00

1+340.00 20.00 0.00 0.00 3.58 2.68 14.70 42.96 100.00% 0.00% 0.00% 14.70 0.00 0.00

1+360.00 20.00 1.04 0.96 0.12 0.09 9.60 44.40 100.00% 0.00% 0.00% 9.60 0.00 0.00

1+380.00 20.00 4.99 4.61 0.00 0.00 55.70 1.44 100.00% 0.00% 0.00% 55.70 0.00 0.00
1+400.00 20.00 5.56 5.13 0.00 0.00 97.40 0.00 100.00% 0.00% 0.00% 97.40 0.00 0.00

1+420.00 20.00 8.76 8.09 0.00 0.00 132.20 0.00 100.00% 0.00% 0.00% 132.20 0.00 0.00

1+440.00 20.00 9.04 8.35 0.00 0.00 164.40 0.00 100.00% 0.00% 0.00% 164.40 0.00 0.00

1+460.00 20.00 7.60 7.02 0.00 0.00 153.70 0.00 100.00% 0.00% 0.00% 153.70 0.00 0.00

1+480.00 20.00 7.94 7.33 0.00 0.00 143.50 0.00 100.00% 0.00% 0.00% 143.50 0.00 0.00
1+500.00 20.00 0.00 0.00 1.85 1.39 73.30 22.20 100.00% 0.00% 0.00% 73.30 0.00 0.00

1+520.00 20.00 0.00 0.00 4.90 3.67 0.00 81.00 100.00% 0.00% 0.00% 0.00 0.00 0.00

1+540.00 20.00 0.00 0.00 1.36 1.02 0.00 75.12 100.00% 0.00% 0.00% 0.00 0.00 0.00

1+560.00 20.00 1.87 1.73 0.00 0.00 17.30 16.32 100.00% 0.00% 0.00% 17.30 0.00 0.00
1+580.00 20.00 5.06 4.67 0.00 0.00 64.00 0.00 100.00% 0.00% 0.00% 64.00 0.00 0.00

EXPLANACIONES (2) 17 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

1+600.00 20.00 9.01 8.32 0.00 0.00 129.90 0.00 100.00% 0.00% 0.00% 129.90 0.00 0.00
1+620.00 20.00 13.99 12.91 0.00 0.00 212.30 0.00 100.00% 0.00% 0.00% 212.30 0.00 0.00

1+640.00 20.00 19.65 18.14 0.00 0.00 310.50 0.00 100.00% 0.00% 0.00% 310.50 0.00 0.00

1+660.00 20.00 18.74 17.30 0.00 0.00 354.40 0.00 100.00% 0.00% 0.00% 354.40 0.00 0.00

1+680.00 20.00 19.61 18.10 0.00 0.00 354.00 0.00 100.00% 0.00% 0.00% 354.00 0.00 0.00
1+700.00 20.00 19.20 17.72 0.00 0.00 358.20 0.00 100.00% 0.00% 0.00% 358.20 0.00 0.00

1+720.00 20.00 18.32 16.91 0.00 0.00 346.30 0.00 100.00% 0.00% 0.00% 346.30 0.00 0.00

1+740.00 20.00 25.11 23.18 0.00 0.00 400.90 0.00 100.00% 0.00% 0.00% 400.90 0.00 0.00

1+760.00 20.00 29.42 27.16 0.00 0.00 503.40 0.00 100.00% 0.00% 0.00% 503.40 0.00 0.00

1+780.00 20.00 29.85 27.56 0.00 0.00 547.20 0.00 100.00% 0.00% 0.00% 547.20 0.00 0.00
1+800.00 20.00 38.85 35.86 0.00 0.00 634.20 0.00 100.00% 0.00% 0.00% 634.20 0.00 0.00

1+820.00 20.00 44.65 41.22 0.00 0.00 770.80 0.00 100.00% 0.00% 0.00% 770.80 0.00 0.00

1+840.00 20.00 57.28 52.88 0.00 0.00 941.00 0.00 100.00% 0.00% 0.00% 941.00 0.00 0.00

1+860.00 20.00 48.31 44.60 0.00 0.00 974.80 0.00 100.00% 0.00% 0.00% 974.80 0.00 0.00

1+880.00 20.00 56.91 52.54 0.00 0.00 971.40 0.00 100.00% 0.00% 0.00% 971.40 0.00 0.00
1+900.00 20.00 46.28 42.72 0.00 0.00 952.60 0.00 100.00% 0.00% 0.00% 952.60 0.00 0.00

1+920.00 20.00 25.41 23.46 0.00 0.00 661.80 0.00 100.00% 0.00% 0.00% 661.80 0.00 0.00

1+940.00 20.00 19.43 17.94 0.00 0.00 414.00 0.00 100.00% 0.00% 0.00% 414.00 0.00 0.00

1+960.00 20.00 10.04 9.27 0.00 0.00 272.10 0.00 100.00% 0.00% 0.00% 272.10 0.00 0.00
1+980.00 20.00 2.44 2.25 0.19 0.14 115.20 2.28 100.00% 0.00% 0.00% 115.20 0.00 0.00

EXPLANACIONES (2) 18 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

2+000.00 20.00 1.06 0.98 0.00 0.00 32.30 2.28 100.00% 0.00% 0.00% 32.30 0.00 0.00
2+020.00 20.00 1.88 1.74 0.00 0.00 27.20 0.00 100.00% 0.00% 0.00% 27.20 0.00 0.00

2+040.00 20.00 2.16 1.99 0.00 0.00 37.30 0.00 100.00% 0.00% 0.00% 37.30 0.00 0.00

2+060.00 20.00 2.36 2.18 0.00 0.00 41.70 0.00 100.00% 0.00% 0.00% 41.70 0.00 0.00

2+080.00 20.00 2.90 2.68 0.00 0.00 48.60 0.00 100.00% 0.00% 0.00% 48.60 0.00 0.00
2+100.00 20.00 2.78 2.57 0.00 0.00 52.50 0.00 100.00% 0.00% 0.00% 52.50 0.00 0.00

2+120.00 20.00 3.80 3.51 0.00 0.00 60.80 0.00 100.00% 0.00% 0.00% 60.80 0.00 0.00

2+140.00 20.00 4.73 4.37 0.00 0.00 78.80 0.00 100.00% 0.00% 0.00% 78.80 0.00 0.00

2+160.00 20.00 4.37 4.03 0.00 0.00 84.00 0.00 100.00% 0.00% 0.00% 84.00 0.00 0.00

2+180.00 20.00 5.79 5.34 0.00 0.00 93.70 0.00 100.00% 0.00% 0.00% 93.70 0.00 0.00
2+200.00 20.00 10.13 9.35 0.00 0.00 146.90 0.00 100.00% 0.00% 0.00% 146.90 0.00 0.00

2+220.00 20.00 19.13 17.66 0.00 0.00 270.10 0.00 100.00% 0.00% 0.00% 270.10 0.00 0.00

2+240.00 20.00 29.10 26.86 0.00 0.00 445.20 0.00 100.00% 0.00% 0.00% 445.20 0.00 0.00

2+260.00 20.00 32.46 29.96 0.00 0.00 568.20 0.00 100.00% 0.00% 0.00% 568.20 0.00 0.00

2+280.00 20.00 23.03 21.26 0.00 0.00 512.20 0.00 100.00% 0.00% 0.00% 512.20 0.00 0.00
2+300.00 20.00 17.15 15.83 0.00 0.00 370.90 0.00 100.00% 0.00% 0.00% 370.90 0.00 0.00

2+320.00 20.00 6.69 6.18 0.00 0.00 220.10 0.00 100.00% 0.00% 0.00% 220.10 0.00 0.00

2+340.00 20.00 6.69 6.18 0.00 0.00 123.60 0.00 100.00% 0.00% 0.00% 123.60 0.00 0.00

2+360.00 20.00 8.49 7.84 0.00 0.00 140.20 0.00 100.00% 0.00% 0.00% 140.20 0.00 0.00
2+380.00 20.00 8.54 7.88 0.00 0.00 157.20 0.00 100.00% 0.00% 0.00% 157.20 0.00 0.00

EXPLANACIONES (2) 19 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

2+400.00 20.00 8.37 7.73 0.00 0.00 156.10 0.00 100.00% 0.00% 0.00% 156.10 0.00 0.00
2+420.00 20.00 9.99 9.22 0.00 0.00 169.50 0.00 100.00% 0.00% 0.00% 169.50 0.00 0.00

2+440.00 20.00 7.05 6.51 0.00 0.00 157.30 0.00 100.00% 0.00% 0.00% 157.30 0.00 0.00

2+460.00 20.00 7.23 6.67 0.00 0.00 131.80 0.00 100.00% 0.00% 0.00% 131.80 0.00 0.00

2+480.00 20.00 7.17 6.62 0.00 0.00 132.90 0.00 100.00% 0.00% 0.00% 132.90 0.00 0.00
2+500.00 20.00 7.74 7.15 0.00 0.00 137.70 0.00 100.00% 0.00% 0.00% 137.70 0.00 0.00

2+520.00 20.00 6.92 6.39 0.00 0.00 135.40 0.00 100.00% 0.00% 0.00% 135.40 0.00 0.00

2+540.00 20.00 7.41 6.84 0.00 0.00 132.30 0.00 100.00% 0.00% 0.00% 132.30 0.00 0.00

2+560.00 20.00 6.14 5.67 0.00 0.00 125.10 0.00 100.00% 0.00% 0.00% 125.10 0.00 0.00

2+580.00 20.00 6.47 5.97 0.00 0.00 116.40 0.00 100.00% 0.00% 0.00% 116.40 0.00 0.00
2+600.00 20.00 6.58 6.07 0.00 0.00 120.40 0.00 100.00% 0.00% 0.00% 120.40 0.00 0.00

2+620.00 20.00 6.85 6.32 0.00 0.00 123.90 0.00 100.00% 0.00% 0.00% 123.90 0.00 0.00

2+640.00 20.00 5.42 5.00 0.00 0.00 113.20 0.00 100.00% 0.00% 0.00% 113.20 0.00 0.00

2+660.00 20.00 9.22 8.51 0.00 0.00 135.10 0.00 100.00% 0.00% 0.00% 135.10 0.00 0.00

2+680.00 20.00 12.37 11.42 0.00 0.00 199.30 0.00 100.00% 0.00% 0.00% 199.30 0.00 0.00
2+700.00 20.00 6.03 5.57 0.00 0.00 169.90 0.00 100.00% 0.00% 0.00% 169.90 0.00 0.00

2+720.00 20.00 1.68 1.55 0.00 0.00 71.20 0.00 100.00% 0.00% 0.00% 71.20 0.00 0.00

2+740.00 20.00 3.15 2.91 0.00 0.00 44.60 0.00 100.00% 0.00% 0.00% 44.60 0.00 0.00

2+760.00 20.00 1.81 1.67 0.05 0.04 45.80 0.60 100.00% 0.00% 0.00% 45.80 0.00 0.00
2+780.00 20.00 2.29 2.11 0.00 0.00 37.80 0.60 100.00% 0.00% 0.00% 37.80 0.00 0.00

EXPLANACIONES (2) 20 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

2+800.00 20.00 2.85 2.63 0.04 0.03 47.40 0.48 100.00% 0.00% 0.00% 47.40 0.00 0.00
2+820.00 20.00 4.25 3.92 0.00 0.00 65.50 0.48 100.00% 0.00% 0.00% 65.50 0.00 0.00

2+840.00 20.00 8.01 7.39 0.00 0.00 113.10 0.00 100.00% 0.00% 0.00% 113.10 0.00 0.00

2+860.00 20.00 10.57 9.76 0.00 0.00 171.50 0.00 100.00% 0.00% 0.00% 171.50 0.00 0.00

2+880.00 20.00 14.11 13.03 0.00 0.00 227.90 0.00 100.00% 0.00% 0.00% 227.90 0.00 0.00
2+900.00 20.00 18.27 16.87 0.00 0.00 299.00 0.00 100.00% 0.00% 0.00% 299.00 0.00 0.00

2+920.00 20.00 23.23 21.44 0.00 0.00 383.10 0.00 100.00% 0.00% 0.00% 383.10 0.00 0.00

2+940.00 20.00 25.80 23.82 0.00 0.00 452.60 0.00 100.00% 0.00% 0.00% 452.60 0.00 0.00

2+960.00 20.00 23.70 21.88 0.00 0.00 457.00 0.00 100.00% 0.00% 0.00% 457.00 0.00 0.00

2+980.00 20.00 18.36 16.95 0.00 0.00 388.30 0.00 80.00% 20.00% 0.00% 310.64 77.66 0.00
3+000.00 20.00 13.54 12.50 0.00 0.00 294.50 0.00 80.00% 20.00% 0.00% 235.60 58.90 0.00

3+020.00 20.00 11.97 11.05 0.00 0.00 235.50 0.00 80.00% 20.00% 0.00% 188.40 47.10 0.00

3+040.00 20.00 3.37 3.11 0.00 0.00 141.60 0.00 80.00% 20.00% 0.00% 113.28 28.32 0.00

3+060.00 20.00 1.85 1.71 0.00 0.00 48.20 0.00 80.00% 20.00% 0.00% 38.56 9.64 0.00

3+080.00 20.00 8.13 7.51 0.00 0.00 92.20 0.00 80.00% 20.00% 0.00% 73.76 18.44 0.00
3+100.00 20.00 14.83 13.69 0.00 0.00 212.00 0.00 80.00% 20.00% 0.00% 169.60 42.40 0.00

3+120.00 20.00 19.43 17.94 0.00 0.00 316.30 0.00 80.00% 20.00% 0.00% 253.04 63.26 0.00

3+140.00 20.00 7.93 7.32 0.00 0.00 252.60 0.00 80.00% 20.00% 0.00% 202.08 50.52 0.00

3+160.00 20.00 1.77 1.63 0.00 0.00 89.50 0.00 80.00% 20.00% 0.00% 71.60 17.90 0.00
3+180.00 20.00 2.43 2.24 0.00 0.00 38.70 0.00 80.00% 20.00% 0.00% 30.96 7.74 0.00

EXPLANACIONES (2) 21 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

3+200.00 20.00 2.50 2.31 0.00 0.00 45.50 0.00 80.00% 20.00% 0.00% 36.40 9.10 0.00
3+220.00 20.00 2.94 2.71 0.00 0.00 50.20 0.00 80.00% 20.00% 0.00% 40.16 10.04 0.00

3+240.00 20.00 2.26 2.09 1.40 1.05 48.00 16.80 100.00% 0.00% 0.00% 48.00 0.00 0.00

3+260.00 20.00 1.65 1.52 1.48 1.11 36.10 34.56 100.00% 0.00% 0.00% 36.10 0.00 0.00

3+280.00 20.00 2.08 1.92 0.00 0.00 34.40 17.76 100.00% 0.00% 0.00% 34.40 0.00 0.00
3+300.00 20.00 2.15 1.98 0.00 0.00 39.00 0.00 100.00% 0.00% 0.00% 39.00 0.00 0.00

3+320.00 20.00 2.13 1.97 0.00 0.00 39.50 0.00 100.00% 0.00% 0.00% 39.50 0.00 0.00

3+340.00 20.00 2.33 2.15 0.00 0.00 41.20 0.00 100.00% 0.00% 0.00% 41.20 0.00 0.00

3+360.00 20.00 4.75 4.38 0.00 0.00 65.30 0.00 100.00% 0.00% 0.00% 65.30 0.00 0.00

3+380.00 20.00 2.75 2.54 0.00 0.00 69.20 0.00 100.00% 0.00% 0.00% 69.20 0.00 0.00
3+400.00 20.00 4.53 4.18 0.00 0.00 67.20 0.00 100.00% 0.00% 0.00% 67.20 0.00 0.00

3+420.00 20.00 5.49 5.07 0.00 0.00 92.50 0.00 100.00% 0.00% 0.00% 92.50 0.00 0.00

3+440.00 20.00 4.47 4.13 0.00 0.00 92.00 0.00 100.00% 0.00% 0.00% 92.00 0.00 0.00

3+460.00 20.00 3.13 2.89 0.00 0.00 70.20 0.00 100.00% 0.00% 0.00% 70.20 0.00 0.00

3+480.00 20.00 1.89 1.74 0.00 0.00 46.30 0.00 100.00% 0.00% 0.00% 46.30 0.00 0.00
3+500.00 20.00 3.60 3.32 0.00 0.00 50.60 0.00 100.00% 0.00% 0.00% 50.60 0.00 0.00

3+520.00 20.00 2.97 2.74 0.00 0.00 60.60 0.00 100.00% 0.00% 0.00% 60.60 0.00 0.00

3+540.00 20.00 4.98 4.60 0.00 0.00 73.40 0.00 100.00% 0.00% 0.00% 73.40 0.00 0.00

3+560.00 20.00 7.19 6.64 0.00 0.00 112.40 0.00 100.00% 0.00% 0.00% 112.40 0.00 0.00
3+580.00 20.00 6.17 5.70 0.00 0.00 123.40 0.00 100.00% 0.00% 0.00% 123.40 0.00 0.00

EXPLANACIONES (2) 22 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

3+600.00 20.00 3.70 3.42 0.00 0.00 91.20 0.00 100.00% 0.00% 0.00% 91.20 0.00 0.00
3+620.00 20.00 2.75 2.54 0.00 0.00 59.60 0.00 100.00% 0.00% 0.00% 59.60 0.00 0.00

3+640.00 20.00 2.31 2.13 0.00 0.00 46.70 0.00 100.00% 0.00% 0.00% 46.70 0.00 0.00

3+660.00 20.00 3.22 2.97 0.00 0.00 51.00 0.00 100.00% 0.00% 0.00% 51.00 0.00 0.00

3+680.00 20.00 3.31 3.06 0.00 0.00 60.30 0.00 100.00% 0.00% 0.00% 60.30 0.00 0.00
3+700.00 20.00 3.53 3.26 0.00 0.00 63.20 0.00 100.00% 0.00% 0.00% 63.20 0.00 0.00

3+720.00 20.00 2.57 2.37 0.00 0.00 56.30 0.00 100.00% 0.00% 0.00% 56.30 0.00 0.00

3+740.00 20.00 5.69 5.25 0.00 0.00 76.20 0.00 100.00% 0.00% 0.00% 76.20 0.00 0.00

3+760.00 20.00 4.54 4.19 0.00 0.00 94.40 0.00 100.00% 0.00% 0.00% 94.40 0.00 0.00

3+780.00 20.00 9.47 8.74 0.00 0.00 129.30 0.00 100.00% 0.00% 0.00% 129.30 0.00 0.00
3+800.00 20.00 2.85 2.63 0.00 0.00 113.70 0.00 100.00% 0.00% 0.00% 113.70 0.00 0.00

3+820.00 20.00 3.10 2.86 0.00 0.00 54.90 0.00 100.00% 0.00% 0.00% 54.90 0.00 0.00

3+840.00 20.00 3.19 2.94 0.00 0.00 58.00 0.00 100.00% 0.00% 0.00% 58.00 0.00 0.00

3+860.00 20.00 2.74 2.53 0.00 0.00 54.70 0.00 100.00% 0.00% 0.00% 54.70 0.00 0.00

3+880.00 20.00 2.39 2.21 0.00 0.00 47.40 0.00 100.00% 0.00% 0.00% 47.40 0.00 0.00
3+900.00 20.00 2.77 2.56 0.00 0.00 47.70 0.00 100.00% 0.00% 0.00% 47.70 0.00 0.00

3+920.00 20.00 3.34 3.08 0.00 0.00 56.40 0.00 100.00% 0.00% 0.00% 56.40 0.00 0.00

3+940.00 20.00 4.01 3.70 0.00 0.00 67.80 0.00 100.00% 0.00% 0.00% 67.80 0.00 0.00

3+960.00 20.00 3.70 3.42 0.00 0.00 71.20 0.00 100.00% 0.00% 0.00% 71.20 0.00 0.00
3+980.00 20.00 3.87 3.57 0.00 0.00 69.90 0.00 100.00% 0.00% 0.00% 69.90 0.00 0.00

EXPLANACIONES (2) 23 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

4+000.00 20.00 3.76 3.47 0.00 0.00 70.40 0.00 100.00% 0.00% 0.00% 70.40 0.00 0.00
4+020.00 20.00 3.92 3.62 0.00 0.00 70.90 0.00 100.00% 0.00% 0.00% 70.90 0.00 0.00

4+040.00 20.00 2.75 2.54 0.00 0.00 61.60 0.00 100.00% 0.00% 0.00% 61.60 0.00 0.00

4+060.00 20.00 2.68 2.47 0.00 0.00 50.10 0.00 100.00% 0.00% 0.00% 50.10 0.00 0.00

4+080.00 20.00 4.52 4.17 0.00 0.00 66.40 0.00 100.00% 0.00% 0.00% 66.40 0.00 0.00
4+100.00 20.00 6.22 5.74 0.00 0.00 99.10 0.00 100.00% 0.00% 0.00% 99.10 0.00 0.00

4+120.00 20.00 4.37 4.03 0.00 0.00 97.70 0.00 100.00% 0.00% 0.00% 97.70 0.00 0.00

4+140.00 20.00 2.21 2.04 0.00 0.00 60.70 0.00 100.00% 0.00% 0.00% 60.70 0.00 0.00

4+160.00 20.00 5.66 5.22 0.00 0.00 72.60 0.00 100.00% 0.00% 0.00% 72.60 0.00 0.00

4+180.00 20.00 9.17 8.47 0.00 0.00 136.90 0.00 100.00% 0.00% 0.00% 136.90 0.00 0.00
4+200.00 20.00 13.62 12.57 0.00 0.00 210.40 0.00 100.00% 0.00% 0.00% 210.40 0.00 0.00

4+220.00 20.00 29.55 27.28 0.00 0.00 398.50 0.00 100.00% 0.00% 0.00% 398.50 0.00 0.00

4+240.00 20.00 30.51 28.16 0.00 0.00 554.40 0.00 100.00% 0.00% 0.00% 554.40 0.00 0.00

4+260.00 20.00 20.67 19.08 0.00 0.00 472.40 0.00 100.00% 0.00% 0.00% 472.40 0.00 0.00

4+280.00 20.00 8.57 7.91 0.00 0.00 269.90 0.00 80.00% 20.00% 0.00% 215.92 53.98 0.00
4+300.00 20.00 0.89 0.82 0.51 0.38 87.30 6.12 80.00% 20.00% 0.00% 69.84 17.46 0.00

4+320.00 20.00 0.00 0.00 3.44 2.58 8.20 47.40 80.00% 20.00% 0.00% 6.56 1.64 0.00

4+340.00 20.00 0.00 0.00 1.31 0.98 0.00 57.00 80.00% 20.00% 0.00% 0.00 0.00 0.00

4+360.00 20.00 3.97 3.66 0.00 0.00 36.60 15.72 80.00% 20.00% 0.00% 29.28 7.32 0.00
4+380.00 20.00 9.42 8.70 0.00 0.00 123.60 0.00 80.00% 20.00% 0.00% 98.88 24.72 0.00

EXPLANACIONES (2) 24 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

4+400.00 20.00 13.29 12.27 0.00 0.00 209.70 0.00 80.00% 20.00% 0.00% 167.76 41.94 0.00
4+420.00 20.00 9.83 9.07 0.00 0.00 213.40 0.00 80.00% 20.00% 0.00% 170.72 42.68 0.00

4+440.00 20.00 4.60 4.25 0.00 0.00 133.20 0.00 80.00% 20.00% 0.00% 106.56 26.64 0.00

4+460.00 20.00 6.55 6.05 0.00 0.00 103.00 0.00 80.00% 20.00% 0.00% 82.40 20.60 0.00

4+480.00 20.00 11.18 10.32 0.00 0.00 163.70 0.00 80.00% 20.00% 0.00% 130.96 32.74 0.00
4+500.00 20.00 8.74 8.07 0.00 0.00 183.90 0.00 80.00% 20.00% 0.00% 147.12 36.78 0.00

4+520.00 20.00 5.17 4.77 0.00 0.00 128.40 0.00 80.00% 20.00% 0.00% 102.72 25.68 0.00

4+540.00 20.00 2.77 2.56 0.00 0.00 73.30 0.00 80.00% 20.00% 0.00% 58.64 14.66 0.00

4+560.00 20.00 0.46 0.42 0.72 0.54 29.80 8.64 80.00% 20.00% 0.00% 23.84 5.96 0.00

4+580.00 20.00 1.98 1.83 0.00 0.00 22.50 8.64 80.00% 20.00% 0.00% 18.00 4.50 0.00
4+600.00 20.00 0.00 0.00 1.89 1.42 18.30 22.68 80.00% 20.00% 0.00% 14.64 3.66 0.00

4+620.00 20.00 0.94 0.87 0.12 0.09 8.70 24.12 80.00% 20.00% 0.00% 6.96 1.74 0.00

4+640.00 20.00 2.62 2.42 0.00 0.00 32.90 1.44 80.00% 20.00% 0.00% 26.32 6.58 0.00

4+660.00 20.00 2.87 2.65 0.00 0.00 50.70 0.00 80.00% 20.00% 0.00% 40.56 10.14 0.00

4+680.00 20.00 3.79 3.50 0.00 0.00 61.50 0.00 80.00% 20.00% 0.00% 49.20 12.30 0.00
4+700.00 20.00 6.83 6.30 0.00 0.00 98.00 0.00 80.00% 20.00% 0.00% 78.40 19.60 0.00

4+720.00 20.00 9.91 9.15 0.00 0.00 154.50 0.00 80.00% 20.00% 0.00% 123.60 30.90 0.00

4+740.00 20.00 13.35 12.32 0.00 0.00 214.70 0.00 100.00% 0.00% 0.00% 214.70 0.00 0.00

4+760.00 20.00 12.54 11.58 0.00 0.00 239.00 0.00 100.00% 0.00% 0.00% 239.00 0.00 0.00
4+780.00 20.00 6.75 6.23 0.00 0.00 178.10 0.00 100.00% 0.00% 0.00% 178.10 0.00 0.00

EXPLANACIONES (2) 25 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

4+800.00 20.00 3.25 3.00 0.15 0.11 92.30 1.80 100.00% 0.00% 0.00% 92.30 0.00 0.00
4+820.00 20.00 0.00 0.00 1.46 1.09 30.00 19.32 100.00% 0.00% 0.00% 30.00 0.00 0.00

4+840.00 20.00 0.00 0.00 1.40 1.05 0.00 34.32 100.00% 0.00% 0.00% 0.00 0.00 0.00

4+860.00 20.00 0.00 0.00 2.51 1.88 0.00 46.92 100.00% 0.00% 0.00% 0.00 0.00 0.00

4+880.00 20.00 0.00 0.00 3.06 2.30 0.00 66.84 100.00% 0.00% 0.00% 0.00 0.00 0.00
4+900.00 20.00 1.44 1.33 0.00 0.00 13.30 36.72 100.00% 0.00% 0.00% 13.30 0.00 0.00

4+920.00 20.00 9.21 8.50 0.00 0.00 98.30 0.00 80.00% 20.00% 0.00% 78.64 19.66 0.00

4+940.00 20.00 22.44 20.72 0.00 0.00 292.20 0.00 80.00% 20.00% 0.00% 233.76 58.44 0.00

4+960.00 20.00 16.68 15.40 0.00 0.00 361.20 0.00 80.00% 20.00% 0.00% 288.96 72.24 0.00

4+980.00 20.00 4.03 3.72 0.00 0.00 191.20 0.00 80.00% 20.00% 0.00% 152.96 38.24 0.00
5+000.00 20.00 2.85 2.63 0.00 0.00 63.50 0.00 80.00% 20.00% 0.00% 50.80 12.70 0.00

5+020.00 20.00 0.53 0.49 0.95 0.71 31.20 11.40 80.00% 20.00% 0.00% 24.96 6.24 0.00

5+040.00 20.00 0.92 0.85 0.05 0.04 13.40 12.00 80.00% 20.00% 0.00% 10.72 2.68 0.00

5+060.00 20.00 4.13 3.81 0.00 0.00 46.60 0.60 80.00% 20.00% 0.00% 37.28 9.32 0.00

5+080.00 20.00 5.21 4.81 0.00 0.00 86.20 0.00 80.00% 20.00% 0.00% 68.96 17.24 0.00
5+100.00 20.00 4.26 3.93 9.36 7.02 87.40 112.32 80.00% 20.00% 0.00% 69.92 17.48 0.00

5+120.00 20.00 7.83 7.23 0.00 0.00 111.60 112.32 80.00% 20.00% 0.00% 89.28 22.32 0.00

5+140.00 20.00 6.82 6.30 0.00 0.00 135.30 0.00 80.00% 20.00% 0.00% 108.24 27.06 0.00

5+160.00 20.00 6.44 5.94 0.00 0.00 122.40 0.00 80.00% 20.00% 0.00% 97.92 24.48 0.00
5+180.00 20.00 12.34 11.39 0.00 0.00 173.30 0.00 80.00% 20.00% 0.00% 138.64 34.66 0.00

EXPLANACIONES (2) 26 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

5+200.00 20.00 20.26 18.70 0.00 0.00 300.90 0.00 80.00% 20.00% 0.00% 240.72 60.18 0.00
5+220.00 20.00 12.50 11.54 0.00 0.00 302.40 0.00 80.00% 20.00% 0.00% 241.92 60.48 0.00

5+240.00 20.00 7.64 7.05 0.00 0.00 185.90 0.00 80.00% 20.00% 0.00% 148.72 37.18 0.00

5+260.00 20.00 2.01 1.86 0.00 0.00 89.10 0.00 80.00% 20.00% 0.00% 71.28 17.82 0.00

5+280.00 20.00 1.29 1.19 0.00 0.00 30.50 0.00 80.00% 20.00% 0.00% 24.40 6.10 0.00
5+300.00 20.00 3.15 2.91 1.94 1.45 41.00 23.28 80.00% 20.00% 0.00% 32.80 8.20 0.00

5+320.00 20.00 4.22 3.90 0.00 0.00 68.10 23.28 80.00% 20.00% 0.00% 54.48 13.62 0.00

5+340.00 20.00 6.92 6.39 0.00 0.00 102.90 0.00 80.00% 20.00% 0.00% 82.32 20.58 0.00

5+360.00 20.00 8.19 7.56 0.00 0.00 139.50 0.00 80.00% 20.00% 0.00% 111.60 27.90 0.00

5+380.00 20.00 19.21 17.73 0.00 0.00 252.90 0.00 80.00% 20.00% 0.00% 202.32 50.58 0.00
5+400.00 20.00 11.91 10.99 0.00 0.00 287.20 0.00 80.00% 20.00% 0.00% 229.76 57.44 0.00

5+420.00 20.00 4.68 4.32 0.12 0.09 153.10 1.44 100.00% 0.00% 0.00% 153.10 0.00 0.00

5+440.00 20.00 0.25 0.23 3.00 2.25 45.50 37.44 100.00% 0.00% 0.00% 45.50 0.00 0.00

5+460.00 20.00 1.36 1.26 4.26 3.19 14.90 87.12 100.00% 0.00% 0.00% 14.90 0.00 0.00

5+480.00 20.00 0.94 0.87 5.44 4.08 21.30 116.40 100.00% 0.00% 0.00% 21.30 0.00 0.00
5+500.00 20.00 0.90 0.83 11.06 8.29 17.00 198.00 100.00% 0.00% 0.00% 17.00 0.00 0.00

5+520.00 20.00 4.71 4.35 11.41 8.55 51.80 269.64 100.00% 0.00% 0.00% 51.80 0.00 0.00

5+540.00 20.00 16.63 15.35 0.00 0.00 197.00 136.92 100.00% 0.00% 0.00% 197.00 0.00 0.00

5+560.00 20.00 16.52 15.25 0.00 0.00 306.00 0.00 100.00% 0.00% 0.00% 306.00 0.00 0.00
5+580.00 20.00 18.19 16.79 0.00 0.00 320.40 0.00 100.00% 0.00% 0.00% 320.40 0.00 0.00

EXPLANACIONES (2) 27 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

5+600.00 20.00 12.04 11.11 0.00 0.00 279.00 0.00 100.00% 0.00% 0.00% 279.00 0.00 0.00
5+620.00 20.00 5.70 5.26 3.75 2.81 163.70 45.00 100.00% 0.00% 0.00% 163.70 0.00 0.00

5+640.00 20.00 1.87 1.73 7.42 5.56 69.90 134.04 100.00% 0.00% 0.00% 69.90 0.00 0.00

5+660.00 20.00 1.75 1.62 0.19 0.14 33.50 91.32 100.00% 0.00% 0.00% 33.50 0.00 0.00

5+680.00 20.00 4.50 4.15 0.03 0.02 57.70 2.64 100.00% 0.00% 0.00% 57.70 0.00 0.00
5+700.00 20.00 14.38 13.27 0.00 0.00 174.20 0.36 100.00% 0.00% 0.00% 174.20 0.00 0.00

5+720.00 20.00 16.92 15.62 0.00 0.00 288.90 0.00 100.00% 0.00% 0.00% 288.90 0.00 0.00

5+740.00 20.00 16.65 15.37 0.00 0.00 309.90 0.00 100.00% 0.00% 0.00% 309.90 0.00 0.00

5+760.00 20.00 10.52 9.71 0.00 0.00 250.80 0.00 100.00% 0.00% 0.00% 250.80 0.00 0.00

5+780.00 20.00 1.28 1.18 0.21 0.16 108.90 2.52 100.00% 0.00% 0.00% 108.90 0.00 0.00
5+800.00 20.00 0.34 0.31 0.21 0.16 14.90 5.04 100.00% 0.00% 0.00% 14.90 0.00 0.00

5+820.00 20.00 0.22 0.20 0.51 0.38 5.10 8.64 100.00% 0.00% 0.00% 5.10 0.00 0.00

5+840.00 20.00 5.21 4.81 0.00 0.00 50.10 6.12 80.00% 20.00% 0.00% 40.08 10.02 0.00

5+860.00 20.00 9.03 8.34 0.00 0.00 131.50 0.00 80.00% 20.00% 0.00% 105.20 26.30 0.00

5+880.00 20.00 7.34 6.78 0.00 0.00 151.20 0.00 80.00% 20.00% 0.00% 120.96 30.24 0.00
5+900.00 20.00 5.92 5.46 0.00 0.00 122.40 0.00 80.00% 20.00% 0.00% 97.92 24.48 0.00

5+920.00 20.00 3.07 2.83 0.00 0.00 82.90 0.00 80.00% 20.00% 0.00% 66.32 16.58 0.00

5+940.00 20.00 0.38 0.35 0.52 0.39 31.80 6.24 80.00% 20.00% 0.00% 25.44 6.36 0.00

5+960.00 20.00 0.00 0.00 1.16 0.87 3.50 20.16 80.00% 20.00% 0.00% 2.80 0.70 0.00
5+980.00 20.00 3.84 3.54 0.00 0.00 35.40 13.92 80.00% 20.00% 0.00% 28.32 7.08 0.00

EXPLANACIONES (2) 28 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

6+000.00 20.00 7.06 6.52 0.00 0.00 100.60 0.00 80.00% 20.00% 0.00% 80.48 20.12 0.00
6+020.00 20.00 7.44 6.87 0.00 0.00 133.90 0.00 80.00% 20.00% 0.00% 107.12 26.78 0.00

6+040.00 20.00 4.48 4.14 0.00 0.00 110.10 0.00 80.00% 20.00% 0.00% 88.08 22.02 0.00

6+060.00 20.00 2.59 2.39 0.00 0.00 65.30 0.00 80.00% 20.00% 0.00% 52.24 13.06 0.00

6+080.00 20.00 2.28 2.10 0.00 0.00 44.90 0.00 80.00% 20.00% 0.00% 35.92 8.98 0.00
6+100.00 20.00 4.41 4.07 0.00 0.00 61.70 0.00 80.00% 20.00% 0.00% 49.36 12.34 0.00

6+120.00 20.00 6.44 5.94 0.00 0.00 100.10 0.00 80.00% 20.00% 0.00% 80.08 20.02 0.00

6+140.00 20.00 6.23 5.75 0.00 0.00 116.90 0.00 80.00% 20.00% 0.00% 93.52 23.38 0.00

6+160.00 20.00 3.30 3.05 0.00 0.00 88.00 0.00 80.00% 20.00% 0.00% 70.40 17.60 0.00

6+180.00 20.00 0.00 0.00 1.93 1.44 30.50 23.16 80.00% 20.00% 0.00% 24.40 6.10 0.00
6+200.00 20.00 0.30 0.28 1.73 1.30 2.80 43.92 80.00% 20.00% 0.00% 2.24 0.56 0.00

6+220.00 20.00 1.09 1.01 0.01 0.01 12.90 20.88 80.00% 20.00% 0.00% 10.32 2.58 0.00

6+240.00 20.00 9.16 8.46 0.00 0.00 94.70 0.12 80.00% 20.00% 0.00% 75.76 18.94 0.00

6+260.00 20.00 17.55 16.20 0.00 0.00 246.60 0.00 100.00% 0.00% 0.00% 246.60 0.00 0.00

6+280.00 20.00 16.50 15.23 0.00 0.00 314.30 0.00 100.00% 0.00% 0.00% 314.30 0.00 0.00
6+300.00 20.00 10.22 9.43 0.00 0.00 246.60 0.00 100.00% 0.00% 0.00% 246.60 0.00 0.00

6+320.00 20.00 8.73 8.06 0.00 0.00 174.90 0.00 100.00% 0.00% 0.00% 174.90 0.00 0.00

6+340.00 20.00 4.94 4.56 0.00 0.00 126.20 0.00 100.00% 0.00% 0.00% 126.20 0.00 0.00

6+360.00 20.00 2.03 1.87 0.17 0.13 64.30 2.04 100.00% 0.00% 0.00% 64.30 0.00 0.00
6+380.00 20.00 1.09 1.01 0.12 0.09 28.80 3.48 100.00% 0.00% 0.00% 28.80 0.00 0.00

EXPLANACIONES (2) 29 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

6+400.00 20.00 0.47 0.43 0.01 0.01 14.40 1.56 100.00% 0.00% 0.00% 14.40 0.00 0.00
6+420.00 20.00 2.29 2.11 0.33 0.25 25.40 4.08 100.00% 0.00% 0.00% 25.40 0.00 0.00

6+440.00 20.00 1.35 1.25 2.26 1.69 33.60 31.08 100.00% 0.00% 0.00% 33.60 0.00 0.00

6+460.00 20.00 3.35 3.09 0.00 0.00 43.40 27.12 100.00% 0.00% 0.00% 43.40 0.00 0.00

6+480.00 20.00 5.49 5.07 0.00 0.00 81.60 0.00 100.00% 0.00% 0.00% 81.60 0.00 0.00
6+500.00 20.00 8.74 8.07 0.00 0.00 131.40 0.00 100.00% 0.00% 0.00% 131.40 0.00 0.00

6+520.00 20.00 11.04 10.19 0.00 0.00 182.60 0.00 100.00% 0.00% 0.00% 182.60 0.00 0.00

6+540.00 20.00 13.24 12.22 0.00 0.00 224.10 0.00 100.00% 0.00% 0.00% 224.10 0.00 0.00

6+560.00 20.00 15.43 14.24 0.00 0.00 264.60 0.00 100.00% 0.00% 0.00% 264.60 0.00 0.00

6+580.00 20.00 4.59 4.24 0.00 0.00 184.80 0.00 100.00% 0.00% 0.00% 184.80 0.00 0.00
6+600.00 20.00 4.03 3.72 0.00 0.00 79.60 0.00 100.00% 0.00% 0.00% 79.60 0.00 0.00

6+620.00 20.00 1.51 1.39 0.00 0.00 51.10 0.00 100.00% 0.00% 0.00% 51.10 0.00 0.00

6+640.00 20.00 0.00 0.00 1.16 0.87 13.90 13.92 100.00% 0.00% 0.00% 13.90 0.00 0.00

6+660.00 20.00 0.00 0.00 3.93 2.94 0.00 61.08 100.00% 0.00% 0.00% 0.00 0.00 0.00

6+680.00 20.00 0.41 0.38 0.05 0.04 3.80 47.76 100.00% 0.00% 0.00% 3.80 0.00 0.00
6+700.00 20.00 5.21 4.81 0.00 0.00 51.90 0.60 100.00% 0.00% 0.00% 51.90 0.00 0.00

6+720.00 20.00 12.49 11.53 0.00 0.00 163.40 0.00 100.00% 0.00% 0.00% 163.40 0.00 0.00

6+740.00 20.00 19.20 17.72 0.00 0.00 292.50 0.00 100.00% 0.00% 0.00% 292.50 0.00 0.00

6+760.00 20.00 19.97 18.43 0.00 0.00 361.50 0.00 100.00% 0.00% 0.00% 361.50 0.00 0.00
6+780.00 20.00 19.17 17.70 0.00 0.00 361.30 0.00 100.00% 0.00% 0.00% 361.30 0.00 0.00

EXPLANACIONES (2) 30 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

6+800.00 20.00 18.45 17.03 0.00 0.00 347.30 0.00 100.00% 0.00% 0.00% 347.30 0.00 0.00
6+820.00 20.00 14.50 13.39 0.00 0.00 304.20 0.00 100.00% 0.00% 0.00% 304.20 0.00 0.00

6+840.00 20.00 7.83 7.23 0.00 0.00 206.20 0.00 100.00% 0.00% 0.00% 206.20 0.00 0.00

6+860.00 20.00 3.58 3.30 1.44 1.08 105.30 17.28 100.00% 0.00% 0.00% 105.30 0.00 0.00

6+880.00 20.00 2.18 2.01 0.24 0.18 53.10 20.16 100.00% 0.00% 0.00% 53.10 0.00 0.00
6+900.00 20.00 4.38 4.04 0.00 0.00 60.50 2.88 100.00% 0.00% 0.00% 60.50 0.00 0.00

6+920.00 20.00 6.45 5.95 0.00 0.00 99.90 0.00 100.00% 0.00% 0.00% 99.90 0.00 0.00

6+940.00 20.00 2.78 2.57 0.00 0.00 85.20 0.00 100.00% 0.00% 0.00% 85.20 0.00 0.00

6+960.00 20.00 1.26 1.16 0.36 0.27 37.30 4.32 100.00% 0.00% 0.00% 37.30 0.00 0.00

6+980.00 20.00 3.94 3.64 0.00 0.00 48.00 4.32 100.00% 0.00% 0.00% 48.00 0.00 0.00
7+000.00 20.00 3.26 3.01 0.00 0.00 66.50 0.00 100.00% 0.00% 0.00% 66.50 0.00 0.00

7+020.00 20.00 3.08 2.84 0.00 0.00 58.50 0.00 100.00% 0.00% 0.00% 58.50 0.00 0.00

7+040.00 20.00 2.51 2.32 0.00 0.00 51.60 0.00 100.00% 0.00% 0.00% 51.60 0.00 0.00

7+060.00 20.00 9.69 8.95 0.00 0.00 112.70 0.00 100.00% 0.00% 0.00% 112.70 0.00 0.00

7+080.00 20.00 20.89 19.28 0.00 0.00 282.30 0.00 100.00% 0.00% 0.00% 282.30 0.00 0.00
7+100.00 20.00 15.79 14.58 0.00 0.00 338.60 0.00 100.00% 0.00% 0.00% 338.60 0.00 0.00

7+120.00 20.00 4.13 3.81 0.00 0.00 183.90 0.00 100.00% 0.00% 0.00% 183.90 0.00 0.00

7+140.00 20.00 7.28 6.72 0.00 0.00 105.30 0.00 100.00% 0.00% 0.00% 105.30 0.00 0.00

7+160.00 20.00 2.30 2.12 0.49 0.37 88.40 5.88 100.00% 0.00% 0.00% 88.40 0.00 0.00
7+180.00 20.00 2.14 1.98 0.33 0.25 41.00 9.84 100.00% 0.00% 0.00% 41.00 0.00 0.00

EXPLANACIONES (2) 31 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

7+200.00 20.00 1.83 1.69 0.37 0.28 36.70 8.40 100.00% 0.00% 0.00% 36.70 0.00 0.00
7+220.00 20.00 1.58 1.46 0.04 0.03 31.50 4.92 100.00% 0.00% 0.00% 31.50 0.00 0.00

7+240.00 20.00 2.19 2.02 0.00 0.00 34.80 0.48 100.00% 0.00% 0.00% 34.80 0.00 0.00

7+260.00 20.00 1.93 1.78 0.00 0.00 38.00 0.00 100.00% 0.00% 0.00% 38.00 0.00 0.00

7+280.00 20.00 2.05 1.89 0.00 0.00 36.70 0.00 100.00% 0.00% 0.00% 36.70 0.00 0.00
7+300.00 20.00 3.39 3.13 0.00 0.00 50.20 0.00 100.00% 0.00% 0.00% 50.20 0.00 0.00

7+320.00 20.00 2.55 2.35 0.00 0.00 54.80 0.00 100.00% 0.00% 0.00% 54.80 0.00 0.00

7+340.00 20.00 2.11 1.95 0.01 0.01 43.00 0.12 100.00% 0.00% 0.00% 43.00 0.00 0.00

7+360.00 20.00 1.84 1.70 0.36 0.27 36.50 4.44 100.00% 0.00% 0.00% 36.50 0.00 0.00

7+380.00 20.00 1.29 1.19 0.31 0.23 28.90 8.04 100.00% 0.00% 0.00% 28.90 0.00 0.00
7+400.00 20.00 2.00 1.85 0.01 0.01 30.40 3.84 100.00% 0.00% 0.00% 30.40 0.00 0.00

7+420.00 20.00 1.67 1.54 0.00 0.00 33.90 0.12 100.00% 0.00% 0.00% 33.90 0.00 0.00

7+440.00 20.00 1.86 1.72 0.00 0.00 32.60 0.00 100.00% 0.00% 0.00% 32.60 0.00 0.00

7+460.00 20.00 2.74 2.53 0.00 0.00 42.50 0.00 100.00% 0.00% 0.00% 42.50 0.00 0.00

7+480.00 20.00 2.14 1.98 0.00 0.00 45.10 0.00 100.00% 0.00% 0.00% 45.10 0.00 0.00
7+500.00 20.00 2.89 2.67 0.00 0.00 46.50 0.00 100.00% 0.00% 0.00% 46.50 0.00 0.00

7+520.00 20.00 1.72 1.59 0.26 0.19 42.60 3.12 100.00% 0.00% 0.00% 42.60 0.00 0.00

7+540.00 20.00 1.31 1.21 0.01 0.01 28.00 3.24 100.00% 0.00% 0.00% 28.00 0.00 0.00

7+560.00 20.00 1.28 1.18 0.01 0.01 23.90 0.24 100.00% 0.00% 0.00% 23.90 0.00 0.00
7+580.00 20.00 3.11 2.87 0.00 0.00 40.50 0.12 100.00% 0.00% 0.00% 40.50 0.00 0.00

EXPLANACIONES (2) 32 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

7+600.00 20.00 2.74 2.53 0.00 0.00 54.00 0.00 100.00% 0.00% 0.00% 54.00 0.00 0.00
7+620.00 20.00 3.51 3.24 0.00 0.00 57.70 0.00 100.00% 0.00% 0.00% 57.70 0.00 0.00

7+640.00 20.00 4.06 3.75 0.00 0.00 69.90 0.00 100.00% 0.00% 0.00% 69.90 0.00 0.00

7+660.00 20.00 3.43 3.17 0.00 0.00 69.20 0.00 100.00% 0.00% 0.00% 69.20 0.00 0.00

7+680.00 20.00 2.57 2.37 0.00 0.00 55.40 0.00 100.00% 0.00% 0.00% 55.40 0.00 0.00
7+700.00 20.00 3.00 2.77 0.00 0.00 51.40 0.00 100.00% 0.00% 0.00% 51.40 0.00 0.00

7+720.00 20.00 3.63 3.35 0.00 0.00 61.20 0.00 100.00% 0.00% 0.00% 61.20 0.00 0.00

7+740.00 20.00 3.30 3.05 0.00 0.00 64.00 0.00 100.00% 0.00% 0.00% 64.00 0.00 0.00

7+760.00 20.00 3.34 3.08 0.00 0.00 61.30 0.00 100.00% 0.00% 0.00% 61.30 0.00 0.00

7+780.00 20.00 2.44 2.25 0.00 0.00 53.30 0.00 100.00% 0.00% 0.00% 53.30 0.00 0.00
7+800.00 20.00 2.25 2.08 0.05 0.04 43.30 0.60 100.00% 0.00% 0.00% 43.30 0.00 0.00

7+820.00 20.00 2.57 2.37 0.00 0.00 44.50 0.60 100.00% 0.00% 0.00% 44.50 0.00 0.00

7+840.00 20.00 2.61 2.41 0.00 0.00 47.80 0.00 100.00% 0.00% 0.00% 47.80 0.00 0.00

7+860.00 20.00 3.66 3.38 0.00 0.00 57.90 0.00 100.00% 0.00% 0.00% 57.90 0.00 0.00

7+880.00 20.00 2.77 2.56 0.00 0.00 59.40 0.00 100.00% 0.00% 0.00% 59.40 0.00 0.00
7+900.00 20.00 2.95 2.72 0.00 0.00 52.80 0.00 100.00% 0.00% 0.00% 52.80 0.00 0.00

7+920.00 20.00 3.34 3.08 0.00 0.00 58.00 0.00 100.00% 0.00% 0.00% 58.00 0.00 0.00

7+940.00 20.00 5.59 5.16 0.00 0.00 82.40 0.00 100.00% 0.00% 0.00% 82.40 0.00 0.00

7+960.00 20.00 5.17 4.77 0.00 0.00 99.30 0.00 100.00% 0.00% 0.00% 99.30 0.00 0.00
7+980.00 20.00 2.38 2.20 0.00 0.00 69.70 0.00 100.00% 0.00% 0.00% 69.70 0.00 0.00

EXPLANACIONES (2) 33 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

8+000.00 20.00 3.12 2.88 0.11 0.08 50.80 1.32 100.00% 0.00% 0.00% 50.80 0.00 0.00
8+020.00 20.00 2.82 2.60 18.93 14.19 54.80 228.48 100.00% 0.00% 0.00% 54.80 0.00 0.00

8+040.00 20.00 1.87 1.73 0.62 0.46 43.30 234.60 100.00% 0.00% 0.00% 43.30 0.00 0.00

8+060.00 20.00 4.13 3.81 0.00 0.00 55.40 7.44 100.00% 0.00% 0.00% 55.40 0.00 0.00

8+080.00 20.00 4.57 4.22 0.00 0.00 80.30 0.00 100.00% 0.00% 0.00% 80.30 0.00 0.00
8+100.00 20.00 4.57 4.22 0.00 0.00 84.40 0.00 100.00% 0.00% 0.00% 84.40 0.00 0.00

8+120.00 20.00 5.19 4.79 0.00 0.00 90.10 0.00 100.00% 0.00% 0.00% 90.10 0.00 0.00

8+140.00 20.00 2.58 2.38 0.00 0.00 71.70 0.00 100.00% 0.00% 0.00% 71.70 0.00 0.00

8+160.00 20.00 1.71 1.58 0.12 0.09 39.60 1.44 100.00% 0.00% 0.00% 39.60 0.00 0.00

8+180.00 20.00 2.00 1.85 0.00 0.00 34.30 1.44 100.00% 0.00% 0.00% 34.30 0.00 0.00
8+200.00 20.00 3.37 3.11 0.00 0.00 49.60 0.00 100.00% 0.00% 0.00% 49.60 0.00 0.00

8+220.00 20.00 5.14 4.74 0.00 0.00 78.50 0.00 100.00% 0.00% 0.00% 78.50 0.00 0.00

8+240.00 20.00 7.43 6.86 0.00 0.00 116.00 0.00 100.00% 0.00% 0.00% 116.00 0.00 0.00

8+260.00 20.00 7.49 6.91 0.00 0.00 137.70 0.00 100.00% 0.00% 0.00% 137.70 0.00 0.00

8+280.00 20.00 5.21 4.81 0.00 0.00 117.20 0.00 100.00% 0.00% 0.00% 117.20 0.00 0.00
8+300.00 20.00 3.09 2.85 0.00 0.00 76.60 0.00 100.00% 0.00% 0.00% 76.60 0.00 0.00

8+320.00 20.00 1.31 1.21 0.04 0.03 40.60 0.48 100.00% 0.00% 0.00% 40.60 0.00 0.00

8+340.00 20.00 1.17 1.08 0.03 0.02 22.90 0.84 100.00% 0.00% 0.00% 22.90 0.00 0.00

8+360.00 20.00 1.71 1.58 0.00 0.00 26.60 0.36 100.00% 0.00% 0.00% 26.60 0.00 0.00
8+380.00 20.00 2.60 2.40 0.00 0.00 39.80 0.00 100.00% 0.00% 0.00% 39.80 0.00 0.00

EXPLANACIONES (2) 34 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

8+400.00 20.00 2.59 2.39 0.00 0.00 47.90 0.00 100.00% 0.00% 0.00% 47.90 0.00 0.00
8+420.00 20.00 2.87 2.65 0.00 0.00 50.40 0.00 100.00% 0.00% 0.00% 50.40 0.00 0.00

8+440.00 20.00 7.13 6.58 0.00 0.00 92.30 0.00 100.00% 0.00% 0.00% 92.30 0.00 0.00

8+460.00 20.00 9.75 9.00 0.00 0.00 155.80 0.00 100.00% 0.00% 0.00% 155.80 0.00 0.00

8+480.00 20.00 0.60 0.55 0.10 0.07 95.50 1.20 100.00% 0.00% 0.00% 95.50 0.00 0.00
8+500.00 20.00 3.03 2.80 0.00 0.00 33.50 1.20 100.00% 0.00% 0.00% 33.50 0.00 0.00

8+520.00 20.00 4.73 4.37 0.30 0.22 71.70 3.60 100.00% 0.00% 0.00% 71.70 0.00 0.00

8+540.00 20.00 0.00 0.00 8.48 6.36 43.70 105.36 100.00% 0.00% 0.00% 43.70 0.00 0.00

8+560.00 20.00 6.12 5.65 0.00 0.00 56.50 101.76 100.00% 0.00% 0.00% 56.50 0.00 0.00

8+580.00 20.00 22.06 20.36 0.00 0.00 260.10 0.00 100.00% 0.00% 0.00% 260.10 0.00 0.00
8+600.00 20.00 37.76 34.86 0.00 0.00 552.20 0.00 100.00% 0.00% 0.00% 552.20 0.00 0.00

8+620.00 20.00 29.51 27.24 0.00 0.00 621.00 0.00 100.00% 0.00% 0.00% 621.00 0.00 0.00

8+640.00 20.00 20.46 18.89 0.00 0.00 461.30 0.00 100.00% 0.00% 0.00% 461.30 0.00 0.00

8+660.00 20.00 12.86 11.87 0.00 0.00 307.60 0.00 100.00% 0.00% 0.00% 307.60 0.00 0.00

8+680.00 20.00 3.53 3.26 0.00 0.00 151.30 0.00 100.00% 0.00% 0.00% 151.30 0.00 0.00
8+700.00 20.00 0.00 0.00 5.09 3.81 32.60 61.08 100.00% 0.00% 0.00% 32.60 0.00 0.00

8+720.00 20.00 0.00 0.00 4.12 3.09 0.00 110.52 100.00% 0.00% 0.00% 0.00 0.00 0.00

8+740.00 20.00 0.00 0.00 2.76 2.07 0.00 82.56 100.00% 0.00% 0.00% 0.00 0.00 0.00

8+760.00 20.00 0.00 0.00 1.12 0.84 0.00 46.56 100.00% 0.00% 0.00% 0.00 0.00 0.00
8+780.00 20.00 5.22 4.82 0.00 0.00 48.20 13.44 100.00% 0.00% 0.00% 48.20 0.00 0.00

EXPLANACIONES (2) 35 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

8+800.00 20.00 9.22 8.51 0.00 0.00 133.30 0.00 100.00% 0.00% 0.00% 133.30 0.00 0.00
8+820.00 20.00 11.38 10.51 0.00 0.00 190.20 0.00 100.00% 0.00% 0.00% 190.20 0.00 0.00

8+840.00 20.00 4.99 4.61 0.00 0.00 151.20 0.00 100.00% 0.00% 0.00% 151.20 0.00 0.00

8+860.00 20.00 0.75 0.69 0.06 0.05 53.00 0.72 100.00% 0.00% 0.00% 53.00 0.00 0.00

8+880.00 20.00 1.87 1.73 0.51 0.38 24.20 6.84 100.00% 0.00% 0.00% 24.20 0.00 0.00
8+900.00 20.00 2.27 2.10 0.00 0.00 38.30 6.12 100.00% 0.00% 0.00% 38.30 0.00 0.00

8+920.00 20.00 6.04 5.58 0.00 0.00 76.80 0.00 100.00% 0.00% 0.00% 76.80 0.00 0.00

8+940.00 20.00 6.90 6.37 0.00 0.00 119.50 0.00 100.00% 0.00% 0.00% 119.50 0.00 0.00

8+960.00 20.00 3.64 3.36 0.00 0.00 97.30 0.00 100.00% 0.00% 0.00% 97.30 0.00 0.00

8+980.00 20.00 1.58 1.46 0.00 0.00 48.20 0.00 100.00% 0.00% 0.00% 48.20 0.00 0.00
9+000.00 20.00 2.15 1.98 0.00 0.00 34.40 0.00 100.00% 0.00% 0.00% 34.40 0.00 0.00

9+020.00 20.00 3.98 3.67 0.00 0.00 56.50 0.00 100.00% 0.00% 0.00% 56.50 0.00 0.00

9+040.00 20.00 6.45 5.95 0.00 0.00 96.20 0.00 100.00% 0.00% 0.00% 96.20 0.00 0.00

9+060.00 20.00 9.34 8.62 0.00 0.00 145.70 0.00 100.00% 0.00% 0.00% 145.70 0.00 0.00

9+080.00 20.00 13.20 12.19 0.00 0.00 208.10 0.00 100.00% 0.00% 0.00% 208.10 0.00 0.00
9+100.00 20.00 14.22 13.13 0.00 0.00 253.20 0.00 100.00% 0.00% 0.00% 253.20 0.00 0.00

9+120.00 20.00 23.13 21.35 0.00 0.00 344.80 0.00 100.00% 0.00% 0.00% 344.80 0.00 0.00

9+140.00 20.00 37.24 34.38 0.00 0.00 557.30 0.00 100.00% 0.00% 0.00% 557.30 0.00 0.00

9+160.00 20.00 46.34 42.78 0.00 0.00 771.60 0.00 100.00% 0.00% 0.00% 771.60 0.00 0.00
9+180.00 20.00 39.99 36.92 0.00 0.00 797.00 0.00 100.00% 0.00% 0.00% 797.00 0.00 0.00

EXPLANACIONES (2) 36 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

9+200.00 20.00 35.30 32.59 0.00 0.00 695.10 0.00 100.00% 0.00% 0.00% 695.10 0.00 0.00
9+220.00 20.00 29.91 27.61 0.00 0.00 602.00 0.00 100.00% 0.00% 0.00% 602.00 0.00 0.00

9+240.00 20.00 21.54 19.88 0.00 0.00 474.90 0.00 100.00% 0.00% 0.00% 474.90 0.00 0.00

9+260.00 20.00 36.20 33.42 0.00 0.00 533.00 0.00 100.00% 0.00% 0.00% 533.00 0.00 0.00

9+280.00 20.00 50.79 46.89 0.00 0.00 803.10 0.00 100.00% 0.00% 0.00% 803.10 0.00 0.00
9+300.00 20.00 30.73 28.37 0.00 0.00 752.60 0.00 100.00% 0.00% 0.00% 752.60 0.00 0.00

9+320.00 20.00 14.78 13.64 0.00 0.00 420.10 0.00 100.00% 0.00% 0.00% 420.10 0.00 0.00

9+340.00 20.00 4.16 3.84 0.00 0.00 174.80 0.00 100.00% 0.00% 0.00% 174.80 0.00 0.00

9+360.00 20.00 0.95 0.88 0.09 0.06 47.20 1.08 100.00% 0.00% 0.00% 47.20 0.00 0.00

9+380.00 20.00 2.19 2.02 0.03 0.02 29.00 1.44 100.00% 0.00% 0.00% 29.00 0.00 0.00
9+400.00 20.00 3.22 2.97 0.00 0.00 49.90 0.36 100.00% 0.00% 0.00% 49.90 0.00 0.00

9+420.00 20.00 3.08 2.84 0.00 0.00 58.10 0.00 80.00% 20.00% 0.00% 46.48 11.62 0.00

9+440.00 20.00 2.43 2.24 0.00 0.00 50.80 0.00 80.00% 20.00% 0.00% 40.64 10.16 0.00

9+460.00 20.00 2.18 2.01 0.00 0.00 42.50 0.00 80.00% 20.00% 0.00% 34.00 8.50 0.00

9+480.00 20.00 2.02 1.86 0.00 0.00 38.70 0.00 80.00% 20.00% 0.00% 30.96 7.74 0.00
9+500.00 20.00 8.97 8.28 0.00 0.00 101.40 0.00 80.00% 20.00% 0.00% 81.12 20.28 0.00

9+520.00 20.00 20.35 18.79 0.00 0.00 270.70 0.00 80.00% 20.00% 0.00% 216.56 54.14 0.00

9+540.00 20.00 27.64 25.52 0.00 0.00 443.10 0.00 80.00% 20.00% 0.00% 354.48 88.62 0.00

9+560.00 20.00 21.72 20.05 0.00 0.00 455.70 0.00 80.00% 20.00% 0.00% 364.56 91.14 0.00
9+580.00 20.00 19.22 17.74 0.00 0.00 377.90 0.00 80.00% 20.00% 0.00% 302.32 75.58 0.00

EXPLANACIONES (2) 37 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

9+600.00 20.00 14.86 13.72 0.00 0.00 314.60 0.00 80.00% 20.00% 0.00% 251.68 62.92 0.00
9+620.00 20.00 15.12 13.96 0.00 0.00 276.80 0.00 80.00% 20.00% 0.00% 221.44 55.36 0.00

9+640.00 20.00 10.83 10.00 0.00 0.00 239.60 0.00 80.00% 20.00% 0.00% 191.68 47.92 0.00

9+660.00 20.00 7.63 7.04 0.00 0.00 170.40 0.00 80.00% 20.00% 0.00% 136.32 34.08 0.00

9+680.00 20.00 3.99 3.68 0.00 0.00 107.20 0.00 80.00% 20.00% 0.00% 85.76 21.44 0.00
9+700.00 20.00 1.66 1.53 0.00 0.00 52.10 0.00 80.00% 20.00% 0.00% 41.68 10.42 0.00

9+720.00 20.00 3.55 3.28 0.00 0.00 48.10 0.00 100.00% 0.00% 0.00% 48.10 0.00 0.00

9+740.00 20.00 6.83 6.30 0.00 0.00 95.80 0.00 100.00% 0.00% 0.00% 95.80 0.00 0.00

9+760.00 20.00 9.18 8.47 0.00 0.00 147.70 0.00 100.00% 0.00% 0.00% 147.70 0.00 0.00

9+780.00 20.00 8.47 7.82 0.00 0.00 162.90 0.00 100.00% 0.00% 0.00% 162.90 0.00 0.00
9+800.00 20.00 4.91 4.53 0.00 0.00 123.50 0.00 100.00% 0.00% 0.00% 123.50 0.00 0.00

9+820.00 20.00 3.95 3.65 0.00 0.00 81.80 0.00 100.00% 0.00% 0.00% 81.80 0.00 0.00

9+840.00 20.00 0.65 0.60 0.21 0.16 42.50 2.52 100.00% 0.00% 0.00% 42.50 0.00 0.00

9+860.00 20.00 3.79 3.50 0.00 0.00 41.00 2.52 100.00% 0.00% 0.00% 41.00 0.00 0.00

9+880.00 20.00 1.19 1.10 0.06 0.05 46.00 0.72 100.00% 0.00% 0.00% 46.00 0.00 0.00
9+900.00 20.00 0.37 0.34 1.27 0.95 14.40 15.96 100.00% 0.00% 0.00% 14.40 0.00 0.00

9+920.00 20.00 0.00 0.00 3.20 2.40 3.40 53.64 100.00% 0.00% 0.00% 3.40 0.00 0.00

9+940.00 20.00 7.09 6.54 0.00 0.00 65.40 38.40 100.00% 0.00% 0.00% 65.40 0.00 0.00

9+960.00 20.00 2.45 2.26 3.41 2.55 88.00 40.92 100.00% 0.00% 0.00% 88.00 0.00 0.00
9+980.00 20.00 10.05 9.28 0.00 0.00 115.40 40.92 100.00% 0.00% 0.00% 115.40 0.00 0.00

EXPLANACIONES (2) 38 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

10+000.00 20.00 13.91 12.84 0.00 0.00 221.20 0.00 100.00% 0.00% 0.00% 221.20 0.00 0.00
10+020.00 20.00 4.92 4.54 0.00 0.00 173.80 0.00 100.00% 0.00% 0.00% 173.80 0.00 0.00

10+040.00 20.00 1.41 1.30 0.72 0.54 58.40 8.64 100.00% 0.00% 0.00% 58.40 0.00 0.00

10+060.00 20.00 10.18 9.40 0.42 0.31 107.00 13.68 100.00% 0.00% 0.00% 107.00 0.00 0.00

10+080.00 20.00 3.41 3.15 0.00 0.00 125.50 5.04 100.00% 0.00% 0.00% 125.50 0.00 0.00
10+100.00 20.00 11.82 10.91 0.00 0.00 140.60 0.00 100.00% 0.00% 0.00% 140.60 0.00 0.00

10+120.00 20.00 15.82 14.60 0.00 0.00 255.10 0.00 100.00% 0.00% 0.00% 255.10 0.00 0.00

10+140.00 20.00 13.46 12.43 0.00 0.00 270.30 0.00 100.00% 0.00% 0.00% 270.30 0.00 0.00

10+160.00 20.00 13.42 12.39 0.00 0.00 248.20 0.00 100.00% 0.00% 0.00% 248.20 0.00 0.00

10+180.00 20.00 9.61 8.87 0.00 0.00 212.60 0.00 100.00% 0.00% 0.00% 212.60 0.00 0.00
10+200.00 20.00 4.80 4.43 0.00 0.00 133.00 0.00 100.00% 0.00% 0.00% 133.00 0.00 0.00

10+220.00 20.00 2.95 2.72 0.00 0.00 71.50 0.00 100.00% 0.00% 0.00% 71.50 0.00 0.00

10+240.00 20.00 0.71 0.66 0.28 0.21 33.80 3.36 100.00% 0.00% 0.00% 33.80 0.00 0.00

10+260.00 20.00 1.76 1.62 0.09 0.06 22.80 4.44 100.00% 0.00% 0.00% 22.80 0.00 0.00

10+280.00 20.00 5.66 5.22 0.00 0.00 68.40 1.08 100.00% 0.00% 0.00% 68.40 0.00 0.00
10+300.00 20.00 8.24 7.61 0.00 0.00 128.30 0.00 100.00% 0.00% 0.00% 128.30 0.00 0.00

10+320.00 20.00 5.25 4.85 0.00 0.00 124.60 0.00 100.00% 0.00% 0.00% 124.60 0.00 0.00

10+340.00 20.00 1.36 1.26 0.24 0.18 61.10 2.88 100.00% 0.00% 0.00% 61.10 0.00 0.00

10+360.00 20.00 1.43 1.32 1.62 1.21 25.80 22.32 100.00% 0.00% 0.00% 25.80 0.00 0.00
10+380.00 20.00 1.73 1.60 0.51 0.38 29.20 25.56 100.00% 0.00% 0.00% 29.20 0.00 0.00

EXPLANACIONES (2) 39 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

10+400.00 20.00 2.55 2.35 0.00 0.00 39.50 6.12 100.00% 0.00% 0.00% 39.50 0.00 0.00
10+420.00 20.00 3.23 2.98 5.51 4.13 53.30 66.12 100.00% 0.00% 0.00% 53.30 0.00 0.00

10+440.00 20.00 4.17 3.85 0.12 0.09 68.30 67.56 100.00% 0.00% 0.00% 68.30 0.00 0.00

10+460.00 20.00 6.04 5.58 0.00 0.00 94.30 1.44 100.00% 0.00% 0.00% 94.30 0.00 0.00

10+480.00 20.00 4.07 3.76 0.00 0.00 93.40 0.00 100.00% 0.00% 0.00% 93.40 0.00 0.00
10+500.00 20.00 14.42 13.31 0.00 0.00 170.70 0.00 100.00% 0.00% 0.00% 170.70 0.00 0.00

10+520.00 20.00 15.10 13.94 0.00 0.00 272.50 0.00 100.00% 0.00% 0.00% 272.50 0.00 0.00

10+540.00 20.00 10.34 9.55 0.00 0.00 234.90 0.00 100.00% 0.00% 0.00% 234.90 0.00 0.00

10+560.00 20.00 8.12 7.50 0.00 0.00 170.50 0.00 100.00% 0.00% 0.00% 170.50 0.00 0.00

10+580.00 20.00 3.61 3.33 0.00 0.00 108.30 0.00 100.00% 0.00% 0.00% 108.30 0.00 0.00
10+600.00 20.00 1.10 1.02 0.03 0.02 43.50 0.36 100.00% 0.00% 0.00% 43.50 0.00 0.00

10+620.00 20.00 4.18 3.86 0.00 0.00 48.80 0.36 100.00% 0.00% 0.00% 48.80 0.00 0.00

10+640.00 20.00 3.90 3.60 0.00 0.00 74.60 0.00 100.00% 0.00% 0.00% 74.60 0.00 0.00

10+660.00 20.00 2.10 1.94 0.00 0.00 55.40 0.00 100.00% 0.00% 0.00% 55.40 0.00 0.00

10+680.00 20.00 2.41 2.22 0.00 0.00 41.60 0.00 100.00% 0.00% 0.00% 41.60 0.00 0.00
10+700.00 20.00 3.63 3.35 0.00 0.00 55.70 0.00 100.00% 0.00% 0.00% 55.70 0.00 0.00

10+720.00 20.00 2.67 2.46 1.12 0.84 58.10 13.44 100.00% 0.00% 0.00% 58.10 0.00 0.00

10+740.00 20.00 4.89 4.51 0.00 0.00 69.70 13.44 100.00% 0.00% 0.00% 69.70 0.00 0.00

10+760.00 20.00 3.01 2.78 0.37 0.28 72.90 4.44 100.00% 0.00% 0.00% 72.90 0.00 0.00
10+780.00 20.00 4.72 4.36 0.37 0.28 71.40 8.88 100.00% 0.00% 0.00% 71.40 0.00 0.00

EXPLANACIONES (2) 40 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

10+800.00 20.00 8.96 8.27 0.00 0.00 126.30 4.44 100.00% 0.00% 0.00% 126.30 0.00 0.00
10+820.00 20.00 16.59 15.31 0.00 0.00 235.80 0.00 100.00% 0.00% 0.00% 235.80 0.00 0.00

10+840.00 20.00 12.73 11.75 0.00 0.00 270.60 0.00 100.00% 0.00% 0.00% 270.60 0.00 0.00

10+860.00 20.00 7.43 6.86 0.00 0.00 186.10 0.00 100.00% 0.00% 0.00% 186.10 0.00 0.00

10+880.00 20.00 9.90 9.14 0.00 0.00 160.00 0.00 100.00% 0.00% 0.00% 160.00 0.00 0.00
10+900.00 20.00 13.52 12.48 0.00 0.00 216.20 0.00 100.00% 0.00% 0.00% 216.20 0.00 0.00

10+920.00 20.00 9.22 8.51 0.00 0.00 209.90 0.00 100.00% 0.00% 0.00% 209.90 0.00 0.00

10+940.00 20.00 4.19 3.87 0.00 0.00 123.80 0.00 100.00% 0.00% 0.00% 123.80 0.00 0.00

10+960.00 20.00 2.15 1.98 0.05 0.04 58.50 0.60 100.00% 0.00% 0.00% 58.50 0.00 0.00

10+980.00 20.00 0.30 0.28 1.53 1.15 22.60 18.96 100.00% 0.00% 0.00% 22.60 0.00 0.00
11+000.00 20.00 0.00 0.00 3.43 2.57 2.80 59.52 100.00% 0.00% 0.00% 2.80 0.00 0.00

11+020.00 20.00 0.21 0.19 0.98 0.73 1.90 52.92 100.00% 0.00% 0.00% 1.90 0.00 0.00

11+040.00 20.00 3.38 3.12 0.00 0.00 33.10 11.76 100.00% 0.00% 0.00% 33.10 0.00 0.00

11+060.00 20.00 5.30 4.89 0.00 0.00 80.10 0.00 100.00% 0.00% 0.00% 80.10 0.00 0.00

11+080.00 20.00 3.64 3.36 0.00 0.00 82.50 0.00 100.00% 0.00% 0.00% 82.50 0.00 0.00
11+100.00 20.00 4.19 3.87 0.00 0.00 72.30 0.00 100.00% 0.00% 0.00% 72.30 0.00 0.00

11+120.00 20.00 1.33 1.23 0.01 0.01 51.00 0.12 100.00% 0.00% 0.00% 51.00 0.00 0.00

11+140.00 20.00 0.00 0.00 1.44 1.08 12.30 17.40 100.00% 0.00% 0.00% 12.30 0.00 0.00

11+160.00 20.00 0.00 0.00 1.32 0.99 0.00 33.12 100.00% 0.00% 0.00% 0.00 0.00 0.00
11+180.00 20.00 11.34 10.47 0.00 0.00 104.70 15.84 100.00% 0.00% 0.00% 104.70 0.00 0.00

EXPLANACIONES (2) 41 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

11+200.00 20.00 14.97 13.82 0.00 0.00 242.90 0.00 100.00% 0.00% 0.00% 242.90 0.00 0.00
11+220.00 20.00 25.79 23.81 0.00 0.00 376.30 0.00 100.00% 0.00% 0.00% 376.30 0.00 0.00

11+240.00 20.00 24.60 22.71 0.00 0.00 465.20 0.00 100.00% 0.00% 0.00% 465.20 0.00 0.00

11+260.00 20.00 0.00 0.00 28.75 21.55 227.10 345.00 100.00% 0.00% 0.00% 227.10 0.00 0.00

11+280.00 20.00 13.53 12.49 0.00 0.00 124.90 345.00 100.00% 0.00% 0.00% 124.90 0.00 0.00
11+300.00 20.00 4.47 4.13 0.24 0.18 166.20 2.88 100.00% 0.00% 0.00% 166.20 0.00 0.00

11+320.00 20.00 0.00 0.00 1.15 0.86 41.30 16.68 100.00% 0.00% 0.00% 41.30 0.00 0.00

11+340.00 20.00 0.25 0.23 1.28 0.96 2.30 29.16 100.00% 0.00% 0.00% 2.30 0.00 0.00

11+360.00 20.00 0.82 0.76 0.92 0.69 9.90 26.40 100.00% 0.00% 0.00% 9.90 0.00 0.00

11+380.00 20.00 4.89 4.51 0.00 0.00 52.70 11.04 100.00% 0.00% 0.00% 52.70 0.00 0.00
11+400.00 20.00 12.02 11.10 0.00 0.00 156.10 0.00 100.00% 0.00% 0.00% 156.10 0.00 0.00

11+420.00 20.00 14.55 13.43 0.00 0.00 245.30 0.00 100.00% 0.00% 0.00% 245.30 0.00 0.00

11+440.00 20.00 18.54 17.11 0.00 0.00 305.40 0.00 100.00% 0.00% 0.00% 305.40 0.00 0.00

11+460.00 20.00 21.09 19.47 0.00 0.00 365.80 0.00 100.00% 0.00% 0.00% 365.80 0.00 0.00

11+480.00 20.00 15.91 14.69 0.00 0.00 341.60 0.00 100.00% 0.00% 0.00% 341.60 0.00 0.00
11+500.00 20.00 5.65 5.22 0.11 0.08 199.10 1.32 100.00% 0.00% 0.00% 199.10 0.00 0.00

11+520.00 20.00 3.01 2.78 0.10 0.07 80.00 2.52 100.00% 0.00% 0.00% 80.00 0.00 0.00

11+540.00 20.00 3.68 3.40 0.00 0.00 61.80 1.20 100.00% 0.00% 0.00% 61.80 0.00 0.00

11+560.00 20.00 2.54 2.34 0.00 0.00 57.40 0.00 100.00% 0.00% 0.00% 57.40 0.00 0.00
11+580.00 20.00 5.78 5.34 0.00 0.00 76.80 0.00 100.00% 0.00% 0.00% 76.80 0.00 0.00

EXPLANACIONES (2) 42 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

11+600.00 20.00 4.61 4.26 0.00 0.00 96.00 0.00 100.00% 0.00% 0.00% 96.00 0.00 0.00
11+620.00 20.00 3.47 3.20 0.00 0.00 74.60 0.00 100.00% 0.00% 0.00% 74.60 0.00 0.00

11+640.00 20.00 2.54 2.34 0.00 0.00 55.40 0.00 100.00% 0.00% 0.00% 55.40 0.00 0.00

11+660.00 20.00 3.37 3.11 0.00 0.00 54.50 0.00 100.00% 0.00% 0.00% 54.50 0.00 0.00

11+680.00 20.00 2.49 2.30 0.00 0.00 54.10 0.00 100.00% 0.00% 0.00% 54.10 0.00 0.00
11+700.00 20.00 1.83 1.69 0.00 0.00 39.90 0.00 100.00% 0.00% 0.00% 39.90 0.00 0.00

11+720.00 20.00 1.54 1.42 0.00 0.00 31.10 0.00 100.00% 0.00% 0.00% 31.10 0.00 0.00

11+740.00 20.00 1.37 1.26 0.00 0.00 26.80 0.00 100.00% 0.00% 0.00% 26.80 0.00 0.00

11+760.00 20.00 1.93 1.78 1.48 1.11 30.40 17.76 100.00% 0.00% 0.00% 30.40 0.00 0.00

11+780.00 20.00 2.68 2.47 1.63 1.22 42.50 37.32 100.00% 0.00% 0.00% 42.50 0.00 0.00
11+800.00 20.00 3.91 3.61 0.00 0.00 60.80 19.56 100.00% 0.00% 0.00% 60.80 0.00 0.00

11+820.00 20.00 3.85 3.55 0.05 0.04 71.60 0.60 100.00% 0.00% 0.00% 71.60 0.00 0.00

11+840.00 20.00 4.23 3.90 0.00 0.00 74.50 0.60 100.00% 0.00% 0.00% 74.50 0.00 0.00

11+860.00 20.00 3.71 3.42 0.00 0.00 73.20 0.00 100.00% 0.00% 0.00% 73.20 0.00 0.00

11+880.00 20.00 2.93 2.70 0.05 0.04 61.20 0.60 100.00% 0.00% 0.00% 61.20 0.00 0.00
11+900.00 20.00 2.84 2.62 0.00 0.00 53.20 0.60 100.00% 0.00% 0.00% 53.20 0.00 0.00

11+920.00 20.00 2.43 2.24 0.00 0.00 48.60 0.00 100.00% 0.00% 0.00% 48.60 0.00 0.00

11+940.00 20.00 2.72 2.51 0.00 0.00 47.50 0.00 80.00% 20.00% 0.00% 38.00 9.50 0.00

11+960.00 20.00 2.31 2.13 0.00 0.00 46.40 0.00 80.00% 20.00% 0.00% 37.12 9.28 0.00
11+980.00 20.00 2.77 2.56 0.85 0.64 46.90 10.20 80.00% 20.00% 0.00% 37.52 9.38 0.00

EXPLANACIONES (2) 43 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

12+000.00 20.00 2.06 1.90 0.37 0.28 44.60 14.64 80.00% 20.00% 0.00% 35.68 8.92 0.00
12+020.00 20.00 1.76 1.62 0.00 0.00 35.20 4.44 80.00% 20.00% 0.00% 28.16 7.04 0.00

12+040.00 20.00 2.76 2.55 0.00 0.00 41.70 0.00 80.00% 20.00% 0.00% 33.36 8.34 0.00

12+060.00 20.00 2.19 2.02 0.00 0.00 45.70 0.00 80.00% 20.00% 0.00% 36.56 9.14 0.00

12+080.00 20.00 2.60 2.40 0.00 0.00 44.20 0.00 80.00% 20.00% 0.00% 35.36 8.84 0.00
12+100.00 20.00 2.40 2.22 0.10 0.07 46.20 1.20 80.00% 20.00% 0.00% 36.96 9.24 0.00

12+120.00 20.00 1.61 1.49 0.01 0.01 37.10 1.32 80.00% 20.00% 0.00% 29.68 7.42 0.00

12+140.00 20.00 2.13 1.97 0.10 0.07 34.60 1.32 80.00% 20.00% 0.00% 27.68 6.92 0.00

12+160.00 20.00 2.25 2.08 0.10 0.07 40.50 2.40 80.00% 20.00% 0.00% 32.40 8.10 0.00

12+180.00 20.00 1.53 1.41 0.14 0.10 34.90 2.88 80.00% 20.00% 0.00% 27.92 6.98 0.00
12+200.00 20.00 1.39 1.28 0.46 0.34 26.90 7.20 80.00% 20.00% 0.00% 21.52 5.38 0.00

12+220.00 20.00 2.17 2.00 0.00 0.00 32.80 5.52 80.00% 20.00% 0.00% 26.24 6.56 0.00

12+240.00 20.00 1.93 1.78 0.11 0.08 37.80 1.32 80.00% 20.00% 0.00% 30.24 7.56 0.00

12+260.00 20.00 3.88 3.58 0.00 0.00 53.60 1.32 80.00% 20.00% 0.00% 42.88 10.72 0.00

12+280.00 20.00 2.04 1.88 0.24 0.18 54.60 2.88 80.00% 20.00% 0.00% 43.68 10.92 0.00
12+300.00 20.00 1.99 1.84 0.42 0.31 37.20 7.92 80.00% 20.00% 0.00% 29.76 7.44 0.00

12+320.00 20.00 2.17 2.00 0.05 0.04 38.40 5.64 80.00% 20.00% 0.00% 30.72 7.68 0.00

12+340.00 20.00 2.63 2.43 0.22 0.17 44.30 3.24 80.00% 20.00% 0.00% 35.44 8.86 0.00

12+360.00 20.00 1.85 1.71 0.51 0.38 41.40 8.76 80.00% 20.00% 0.00% 33.12 8.28 0.00
12+380.00 20.00 1.48 1.37 0.01 0.01 30.80 6.24 80.00% 20.00% 0.00% 24.64 6.16 0.00

EXPLANACIONES (2) 44 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

12+400.00 20.00 1.43 1.32 0.24 0.18 26.90 3.00 80.00% 20.00% 0.00% 21.52 5.38 0.00
12+420.00 20.00 3.41 3.15 0.00 0.00 44.70 2.88 80.00% 20.00% 0.00% 35.76 8.94 0.00

12+440.00 20.00 6.64 6.13 0.00 0.00 92.80 0.00 80.00% 20.00% 0.00% 74.24 18.56 0.00

12+460.00 20.00 2.54 2.34 0.00 0.00 84.70 0.00 80.00% 20.00% 0.00% 67.76 16.94 0.00

12+480.00 20.00 2.60 2.40 0.00 0.00 47.40 0.00 80.00% 20.00% 0.00% 37.92 9.48 0.00
12+500.00 20.00 2.92 2.70 0.05 0.04 51.00 0.60 80.00% 20.00% 0.00% 40.80 10.20 0.00

12+520.00 20.00 2.45 2.26 0.52 0.39 49.60 6.84 80.00% 20.00% 0.00% 39.68 9.92 0.00

12+540.00 20.00 1.74 1.61 0.03 0.02 38.70 6.60 80.00% 20.00% 0.00% 30.96 7.74 0.00

12+560.00 20.00 1.60 1.48 0.10 0.07 30.90 1.56 80.00% 20.00% 0.00% 24.72 6.18 0.00

12+580.00 20.00 4.04 3.73 0.00 0.00 52.10 1.20 80.00% 20.00% 0.00% 41.68 10.42 0.00
12+600.00 20.00 10.79 9.96 0.00 0.00 136.90 0.00 80.00% 20.00% 0.00% 109.52 27.38 0.00

12+620.00 20.00 3.79 3.50 0.00 0.00 134.60 0.00 80.00% 20.00% 0.00% 107.68 26.92 0.00

12+640.00 20.00 3.25 3.00 0.00 0.00 65.00 0.00 80.00% 20.00% 0.00% 52.00 13.00 0.00

12+660.00 20.00 4.70 4.34 0.00 0.00 73.40 0.00 80.00% 20.00% 0.00% 58.72 14.68 0.00

12+680.00 20.00 7.42 6.85 0.00 0.00 111.90 0.00 80.00% 20.00% 0.00% 89.52 22.38 0.00
12+700.00 20.00 5.89 5.44 0.00 0.00 122.90 0.00 80.00% 20.00% 0.00% 98.32 24.58 0.00

12+720.00 20.00 3.50 3.23 0.00 0.00 86.70 0.00 80.00% 20.00% 0.00% 69.36 17.34 0.00

12+740.00 20.00 5.24 4.84 0.00 0.00 80.70 0.00 80.00% 20.00% 0.00% 64.56 16.14 0.00

12+760.00 20.00 3.23 2.98 0.00 0.00 78.20 0.00 80.00% 20.00% 0.00% 62.56 15.64 0.00
12+780.00 20.00 3.19 2.94 0.00 0.00 59.20 0.00 80.00% 20.00% 0.00% 47.36 11.84 0.00

EXPLANACIONES (2) 45 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

12+800.00 20.00 3.20 2.95 0.00 0.00 58.90 0.00 100.00% 0.00% 0.00% 58.90 0.00 0.00
12+820.00 20.00 5.64 5.21 0.00 0.00 81.60 0.00 100.00% 0.00% 0.00% 81.60 0.00 0.00

12+840.00 20.00 11.60 10.71 0.00 0.00 159.20 0.00 100.00% 0.00% 0.00% 159.20 0.00 0.00

12+860.00 20.00 8.19 7.56 0.00 0.00 182.70 0.00 100.00% 0.00% 0.00% 182.70 0.00 0.00

12+880.00 20.00 7.11 6.56 0.00 0.00 141.20 0.00 100.00% 0.00% 0.00% 141.20 0.00 0.00
12+900.00 20.00 14.94 13.79 0.00 0.00 203.50 0.00 100.00% 0.00% 0.00% 203.50 0.00 0.00

12+920.00 20.00 8.19 7.56 0.00 0.00 213.50 0.00 100.00% 0.00% 0.00% 213.50 0.00 0.00

12+940.00 20.00 6.49 5.99 0.00 0.00 135.50 0.00 100.00% 0.00% 0.00% 135.50 0.00 0.00

12+960.00 20.00 9.67 8.93 0.00 0.00 149.20 0.00 100.00% 0.00% 0.00% 149.20 0.00 0.00

12+980.00 20.00 9.85 9.09 0.00 0.00 180.20 0.00 100.00% 0.00% 0.00% 180.20 0.00 0.00
13+000.00 20.00 7.39 6.82 0.04 0.03 159.10 0.48 100.00% 0.00% 0.00% 159.10 0.00 0.00

13+020.00 20.00 4.49 4.14 0.00 0.00 109.60 0.48 100.00% 0.00% 0.00% 109.60 0.00 0.00

13+040.00 20.00 5.41 4.99 0.00 0.00 91.30 0.00 100.00% 0.00% 0.00% 91.30 0.00 0.00

13+060.00 20.00 7.68 7.09 0.00 0.00 120.80 0.00 100.00% 0.00% 0.00% 120.80 0.00 0.00

13+080.00 20.00 7.93 7.32 0.00 0.00 144.10 0.00 100.00% 0.00% 0.00% 144.10 0.00 0.00
13+100.00 20.00 8.26 7.63 0.00 0.00 149.50 0.00 100.00% 0.00% 0.00% 149.50 0.00 0.00

13+120.00 20.00 15.70 14.49 0.00 0.00 221.20 0.00 100.00% 0.00% 0.00% 221.20 0.00 0.00

13+140.00 20.00 10.22 9.43 0.00 0.00 239.20 0.00 100.00% 0.00% 0.00% 239.20 0.00 0.00

13+160.00 20.00 2.57 2.37 0.00 0.00 118.00 0.00 100.00% 0.00% 0.00% 118.00 0.00 0.00
13+180.00 20.00 0.00 0.00 5.85 4.39 23.70 70.20 100.00% 0.00% 0.00% 23.70 0.00 0.00

EXPLANACIONES (2) 46 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

13+200.00 20.00 0.00 0.00 7.79 5.84 0.00 163.68 100.00% 0.00% 0.00% 0.00 0.00 0.00
13+220.00 20.00 0.00 0.00 3.91 2.93 0.00 140.40 100.00% 0.00% 0.00% 0.00 0.00 0.00

13+240.00 20.00 0.00 0.00 0.88 0.66 0.00 57.48 100.00% 0.00% 0.00% 0.00 0.00 0.00

13+260.00 20.00 1.39 1.28 0.04 0.03 12.80 11.04 100.00% 0.00% 0.00% 12.80 0.00 0.00

13+280.00 20.00 3.95 3.65 0.00 0.00 49.30 0.48 100.00% 0.00% 0.00% 49.30 0.00 0.00
13+300.00 20.00 7.68 7.09 0.00 0.00 107.40 0.00 100.00% 0.00% 0.00% 107.40 0.00 0.00

13+320.00 20.00 10.30 9.51 0.00 0.00 166.00 0.00 100.00% 0.00% 0.00% 166.00 0.00 0.00

13+340.00 20.00 7.79 7.19 0.00 0.00 167.00 0.00 100.00% 0.00% 0.00% 167.00 0.00 0.00

13+360.00 20.00 7.08 6.54 0.00 0.00 137.30 0.00 100.00% 0.00% 0.00% 137.30 0.00 0.00

13+380.00 20.00 5.04 4.65 0.00 0.00 111.90 0.00 100.00% 0.00% 0.00% 111.90 0.00 0.00
13+400.00 20.00 5.49 5.07 0.00 0.00 97.20 0.00 100.00% 0.00% 0.00% 97.20 0.00 0.00

13+420.00 20.00 5.86 5.41 0.00 0.00 104.80 0.00 100.00% 0.00% 0.00% 104.80 0.00 0.00

13+440.00 20.00 3.56 3.29 0.01 0.01 87.00 0.12 100.00% 0.00% 0.00% 87.00 0.00 0.00

13+460.00 20.00 3.03 2.80 0.17 0.13 60.90 2.16 100.00% 0.00% 0.00% 60.90 0.00 0.00

13+480.00 20.00 1.49 1.38 0.17 0.13 41.80 4.08 100.00% 0.00% 0.00% 41.80 0.00 0.00
13+500.00 20.00 1.80 1.66 0.00 0.00 30.40 2.04 100.00% 0.00% 0.00% 30.40 0.00 0.00

13+520.00 20.00 2.87 2.65 0.00 0.00 43.10 0.00 100.00% 0.00% 0.00% 43.10 0.00 0.00

13+540.00 20.00 5.93 5.47 0.00 0.00 81.20 0.00 100.00% 0.00% 0.00% 81.20 0.00 0.00

13+560.00 20.00 3.51 3.24 0.00 0.00 87.10 0.00 100.00% 0.00% 0.00% 87.10 0.00 0.00
13+580.00 20.00 4.52 4.17 0.10 0.07 74.10 1.20 100.00% 0.00% 0.00% 74.10 0.00 0.00

EXPLANACIONES (2) 47 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

13+600.00 20.00 4.72 4.36 0.00 0.00 85.30 1.20 100.00% 0.00% 0.00% 85.30 0.00 0.00
13+620.00 20.00 4.45 4.11 0.00 0.00 84.70 0.00 100.00% 0.00% 0.00% 84.70 0.00 0.00

13+640.00 20.00 4.76 4.39 0.00 0.00 85.00 0.00 100.00% 0.00% 0.00% 85.00 0.00 0.00

13+660.00 20.00 5.15 4.75 0.00 0.00 91.40 0.00 100.00% 0.00% 0.00% 91.40 0.00 0.00

13+680.00 20.00 5.86 5.41 0.00 0.00 101.60 0.00 100.00% 0.00% 0.00% 101.60 0.00 0.00
13+700.00 20.00 6.38 5.89 0.00 0.00 113.00 0.00 100.00% 0.00% 0.00% 113.00 0.00 0.00

13+720.00 20.00 7.42 6.85 0.00 0.00 127.40 0.00 100.00% 0.00% 0.00% 127.40 0.00 0.00

13+740.00 20.00 6.65 6.14 0.00 0.00 129.90 0.00 100.00% 0.00% 0.00% 129.90 0.00 0.00

13+760.00 20.00 6.64 6.13 0.00 0.00 122.70 0.00 100.00% 0.00% 0.00% 122.70 0.00 0.00

13+780.00 20.00 5.88 5.43 0.00 0.00 115.60 0.00 100.00% 0.00% 0.00% 115.60 0.00 0.00
13+800.00 20.00 9.54 8.81 0.00 0.00 142.40 0.00 100.00% 0.00% 0.00% 142.40 0.00 0.00

13+820.00 20.00 8.48 7.83 0.00 0.00 166.40 0.00 100.00% 0.00% 0.00% 166.40 0.00 0.00

13+840.00 20.00 7.75 7.15 0.00 0.00 149.80 0.00 100.00% 0.00% 0.00% 149.80 0.00 0.00

13+860.00 20.00 5.33 4.92 0.00 0.00 120.70 0.00 100.00% 0.00% 0.00% 120.70 0.00 0.00

13+880.00 20.00 4.97 4.59 0.00 0.00 95.10 0.00 100.00% 0.00% 0.00% 95.10 0.00 0.00
13+900.00 20.00 3.29 3.04 0.00 0.00 76.30 0.00 100.00% 0.00% 0.00% 76.30 0.00 0.00

13+920.00 20.00 3.22 2.97 0.00 0.00 60.10 0.00 100.00% 0.00% 0.00% 60.10 0.00 0.00

13+940.00 20.00 2.82 2.60 0.00 0.00 55.70 0.00 100.00% 0.00% 0.00% 55.70 0.00 0.00

13+960.00 20.00 6.54 6.04 0.00 0.00 86.40 0.00 100.00% 0.00% 0.00% 86.40 0.00 0.00
13+980.00 20.00 3.85 3.55 0.00 0.00 95.90 0.00 100.00% 0.00% 0.00% 95.90 0.00 0.00

EXPLANACIONES (2) 48 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

14+000.00 20.00 2.24 2.07 1.78 1.33 56.20 21.36 100.00% 0.00% 0.00% 56.20 0.00 0.00
14+020.00 20.00 2.27 2.10 0.00 0.00 41.70 21.36 100.00% 0.00% 0.00% 41.70 0.00 0.00

14+040.00 20.00 2.62 2.42 0.00 0.00 45.20 0.00 100.00% 0.00% 0.00% 45.20 0.00 0.00

14+060.00 20.00 2.83 2.61 0.00 0.00 50.30 0.00 100.00% 0.00% 0.00% 50.30 0.00 0.00

14+080.00 20.00 4.14 3.82 0.00 0.00 64.30 0.00 100.00% 0.00% 0.00% 64.30 0.00 0.00
14+100.00 20.00 6.66 6.15 0.00 0.00 99.70 0.00 100.00% 0.00% 0.00% 99.70 0.00 0.00

14+120.00 20.00 18.27 16.87 0.00 0.00 230.20 0.00 100.00% 0.00% 0.00% 230.20 0.00 0.00

14+140.00 20.00 6.52 6.02 0.00 0.00 228.90 0.00 100.00% 0.00% 0.00% 228.90 0.00 0.00

14+160.00 20.00 8.81 8.13 0.00 0.00 141.50 0.00 100.00% 0.00% 0.00% 141.50 0.00 0.00

14+180.00 20.00 6.50 6.00 0.00 0.00 141.30 0.00 100.00% 0.00% 0.00% 141.30 0.00 0.00
14+200.00 20.00 6.61 6.10 0.00 0.00 121.00 0.00 100.00% 0.00% 0.00% 121.00 0.00 0.00

14+220.00 20.00 8.04 7.42 0.00 0.00 135.20 0.00 100.00% 0.00% 0.00% 135.20 0.00 0.00

14+240.00 20.00 7.33 6.77 0.00 0.00 141.90 0.00 100.00% 0.00% 0.00% 141.90 0.00 0.00

14+260.00 20.00 4.93 4.55 0.00 0.00 113.20 0.00 100.00% 0.00% 0.00% 113.20 0.00 0.00

14+280.00 20.00 7.99 7.38 0.00 0.00 119.30 0.00 100.00% 0.00% 0.00% 119.30 0.00 0.00
14+300.00 20.00 5.46 5.04 1.38 1.04 124.20 16.56 100.00% 0.00% 0.00% 124.20 0.00 0.00

14+320.00 20.00 4.59 4.24 2.63 1.97 92.80 48.12 100.00% 0.00% 0.00% 92.80 0.00 0.00

14+340.00 20.00 6.51 6.01 0.00 0.00 102.50 31.56 100.00% 0.00% 0.00% 102.50 0.00 0.00

14+360.00 20.00 1.78 1.64 1.10 0.82 76.50 13.20 100.00% 0.00% 0.00% 76.50 0.00 0.00
14+380.00 20.00 1.77 1.63 0.69 0.52 32.70 21.48 100.00% 0.00% 0.00% 32.70 0.00 0.00

EXPLANACIONES (2) 49 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

14+400.00 20.00 0.75 0.69 0.22 0.17 23.20 10.92 100.00% 0.00% 0.00% 23.20 0.00 0.00
14+420.00 20.00 0.72 0.66 3.59 2.69 13.50 45.72 100.00% 0.00% 0.00% 13.50 0.00 0.00

14+440.00 20.00 5.72 5.28 2.04 1.53 59.40 67.56 100.00% 0.00% 0.00% 59.40 0.00 0.00

14+460.00 20.00 4.66 4.30 0.03 0.02 95.80 24.84 80.00% 20.00% 0.00% 76.64 19.16 0.00

14+480.00 20.00 10.55 9.74 0.00 0.00 140.40 0.36 80.00% 20.00% 0.00% 112.32 28.08 0.00
14+500.00 20.00 0.20 0.18 1.75 1.31 99.20 21.00 80.00% 20.00% 0.00% 79.36 19.84 0.00

14+520.00 20.00 0.00 0.00 2.75 2.06 1.80 54.00 80.00% 20.00% 0.00% 1.44 0.36 0.00

14+540.00 20.00 2.52 2.33 0.00 0.00 23.30 33.00 80.00% 20.00% 0.00% 18.64 4.66 0.00

14+560.00 20.00 18.46 17.04 0.00 0.00 193.70 0.00 80.00% 20.00% 0.00% 154.96 38.74 0.00

14+580.00 20.00 10.32 9.53 0.00 0.00 265.70 0.00 80.00% 20.00% 0.00% 212.56 53.14 0.00
14+600.00 20.00 7.14 6.59 0.00 0.00 161.20 0.00 80.00% 20.00% 0.00% 128.96 32.24 0.00

14+620.00 20.00 10.54 9.73 0.00 0.00 163.20 0.00 80.00% 20.00% 0.00% 130.56 32.64 0.00

14+640.00 20.00 10.83 10.00 0.00 0.00 197.30 0.00 80.00% 20.00% 0.00% 157.84 39.46 0.00

14+660.00 20.00 11.31 10.44 0.00 0.00 204.40 0.00 80.00% 20.00% 0.00% 163.52 40.88 0.00

14+680.00 20.00 4.61 4.26 0.00 0.00 147.00 0.00 80.00% 20.00% 0.00% 117.60 29.40 0.00
14+700.00 20.00 2.64 2.44 0.00 0.00 67.00 0.00 80.00% 20.00% 0.00% 53.60 13.40 0.00

14+720.00 20.00 4.46 4.12 0.00 0.00 65.60 0.00 80.00% 20.00% 0.00% 52.48 13.12 0.00

14+740.00 20.00 3.39 3.13 0.00 0.00 72.50 0.00 80.00% 20.00% 0.00% 58.00 14.50 0.00

14+760.00 20.00 1.37 1.26 1.22 0.92 43.90 14.64 80.00% 20.00% 0.00% 35.12 8.78 0.00
14+780.00 20.00 7.69 7.10 0.00 0.00 83.60 14.64 80.00% 20.00% 0.00% 66.88 16.72 0.00

EXPLANACIONES (2) 50 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“MEJORAMIENTO DE SERVICIO DE TRANSITABILIDAD VEHICULAR DEL CAMINO VECINAL, TRAMO OCROS – CCERAOCRO DEL DISTRITO DE OCROS, DE LA PROVINCIA DE HUAMANGA, DEL DEPARTAMENTO
PROYECTO DE AYACUCHO”

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN CLASIFICACION DE MATERIAL VOLUMEN DE CORTE

PROG. DIST.
RELLENO RELLENO RELLENO M. SUELTO R. SUELTA M. SUELTO R. SUELTA
CORTE (M2) CORTE (M2) CORTE (M3) R. FIJA (%) R. FIJA (M3)
(M2) (M2) F.C.=1.20 (M3) (%) (%) (M3) (M3)

14+800.00 20.00 8.18 7.55 0.00 0.00 146.50 0.00 80.00% 20.00% 0.00% 117.20 29.30 0.00
14+820.00 20.00 10.88 10.04 0.00 0.00 175.90 0.00 80.00% 20.00% 0.00% 140.72 35.18 0.00

14+840.00 20.00 10.55 9.74 0.00 0.00 197.80 0.00 80.00% 20.00% 0.00% 158.24 39.56 0.00

14+860.00 20.00 12.17 11.23 0.00 0.00 209.70 0.00 100.00% 20.00% 0.00% 209.70 41.94 0.00

14+880.00 20.00 12.16 11.23 0.00 0.00 224.60 0.00 100.00% 20.00% 0.00% 224.60 44.92 0.00
14+900.00 20.00 21.21 19.58 0.00 0.00 308.10 0.00 100.00% 20.00% 0.00% 308.10 61.62 0.00

14+920.00 20.00 21.31 19.67 0.00 0.00 392.50 0.00 100.00% 20.00% 0.00% 392.50 78.50 0.00

14+940.00 20.00 15.10 13.94 0.00 0.00 336.10 0.00 100.00% 20.00% 0.00% 336.10 67.22 0.00

14+960.00 20.00 6.15 5.68 0.00 0.00 196.20 0.00 100.00% 20.00% 0.00% 196.20 39.24 0.00

14+980.00 20.00 0.25 0.23 3.77 2.82 59.10 45.24 100.00% 20.00% 0.00% 59.10 11.82 0.00
15+000.00 20.00 0.00 0.00 4.99 3.74 2.30 105.12 100.00% 20.00% 0.00% 2.30 0.46 0.00

15+020.00 20.00 1.56 1.44 0.32 0.24 14.40 63.72 100.00% 20.00% 0.00% 14.40 2.88 0.00

15+040.00 20.00 2.78 2.57 0.00 0.00 40.10 3.84 100.00% 20.00% 0.00% 40.10 8.02 0.00
SUB T O T A L 95,971.45 7,068.96 92,106.82 3,864.63 0.00

EXPLANACIONES (2) 51 DE 209


01.03.04 PUENTE TIPO VIGA L=10 M
01.03.04.01 TRABAJOS PRELIMINARES
TRANQUERAS DE MADERA 1.20X1.10M
01.03.04.01.01 P/DESVIO TRANSITO VEHICULAR
IDEM AL ITEM
TRAZO Y REPLANTEO PRELIMINAR
01.03.04.01.02
IDEM AL ITEM
TRAZO Y REPLANTEO DURANTE LA OBRA
01.03.04.01.03
IDEM AL ITEM
01.03.04.02 MOVIMIENTO DE TIERRAS
EXCAVACION PARA ESTRUCTURA EN MATERIAL
01.03.04.02.01 SUELTO, EN SECO
IDEM AL ITEM
EXCAVACION PARA ESTRUCTURA EN MATERIAL
01.03.04.02.02 SUELTO, EN AGUA
IDEM AL ITEM
REFINE Y NIVELACION EN TERRENO NORMAL
01.03.04.02.03
IDEM AL ITEM
RELLENO COMPACTADO CON MATERIAL
01.03.04.02.04 PROPIO
IDEM AL ITEM
ELIMINACION DE MATERIAL EXCEDENTE
01.03.04.02.05
IDEM AL ITEM
01.03.04.03 OBRAS DE CONCRETO SIMPLE
01.03.04.03.01 ZAPATAS
SOLADO PARA ZAPATAS CONCRETO F'C=100
01.03.04.03.01.01 KG/CM2 E=10CM.
IDEM AL ITEM
ENCOFRADO Y DESENCOFRADO PARA ZAPATAS
01.03.04.03.01.02
IDEM AL ITEM
CONCRETO EN ZAPATAS F'C= 175 KG/CM2 +30%
01.03.04.03.01.03 P.M.
IDEM AL ITEM
01.03.04.03.02 ESTRIBOS
ENCOFRADO Y DESENCOFRADO DE ESTRIBOS
01.03.04.03.02.01
IDEM AL ITEM 04.03.02.01
CONCRETO PARA ESTRIBOS F'C=175 KG/CM2 +
01.03.04.03.02.02 30% P.M.
IDEM AL ITEM
01.03.04.04 OBRAS DE CONCRETO ARMADO
01.03.04.04.01 SUPER ESTRUCTURA
ENCOFRADO Y DESENCOFRADO PARA LOSA Y
01.03.04.04.01.01 VIGA
IDEM AL ITEM
CONCRETO F'C=210 KG/CM2 PARA LOSAS
01.03.04.04.01.02 MACIZAS
01.03.04.04.01.02
IDEM AL ITEM
ACERO DE REFUERZO EN LOSA MACIZA
01.03.04.04.01.03
IDEM AL ITEM
01.03.04.05 CARPINTERIA METALICA
BARANDA DE TUBO Fo. Go. PASAMANO 2"
01.03.04.05.01
IDEM AL ITEM
01.03.04.06 SISTEMA DE EVACUACION FLUVIAL
TUBOS DE DRENAJE D=3’’ L = 0.50 M
01.03.04.06.01
IDEM AL ITEM
01.03.04.07 VARIOS
NEOPRENE E=0.50 M X 5.20 M.
01.03.04.07.01
IDEM AL ITEM
JUNTAS ASFALTICAS
01.03.04.07.02
IDEM AL ITEM
LIMPIEZA FINAL DE OBRA
01.03.04.07.03
IDEM AL ITEM
01.03.03 PUENTE TIPO LOSA DE L=9.4M. PROG 0+323 KM
01.03.03.01 TRABAJOS PRELIMINARES
01.03.03.01.01 01.03.03.01.01 TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSI
01.03.03.01.02 TRAZO Y REPLANTEO PRELIMINAR

01.03.03.01.02 01.03.03.01.03 TRAZO Y REPLANTEO DURANTE LA OBRA


01.03.03.02 MOVIMIENTO DE TIERRAS

01.03.03.01.03 01.03.03.02.01 EXCAVACION PARA ESTRUCTURA EN MATERIAL SUELTO


01.03.03.02.02 EXCAVACION PARA ESTRUCTURA EN MATERIAL SUELTO

01.03.03.02.03 REFINE Y NIVELACION EN TERRENO NORMAL

01.03.03.02.01 01.03.03.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO

01.03.03.02.02 01.03.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE

01.03.03.03 OBRAS DE CONCRETO SIMPLE


01.03.03.02.03 01.03.03.03.01 ZAPATAS
01.03.03.03.01.01 SOLADO PARA ZAPATAS CONCRETO F'C=140 KG/CM2 E

01.03.03.02.04 01.03.03.03.01.02 ENCOFRADO Y DESENCOFRADO PARA ZAPATAS

01.03.03.03.01.03 CONCRETO F'C= 175 KG/CM2.+ 30% P.G. EN ZAPATAS

01.03.03.02.05 01.03.03.03.02 ESTRIBOS


01.03.03.03.02.01 ENCOFRADO Y DESENCOFRADO DE ESTRIBOS
01.03.03.03.02.02 CONCRETO F'C= 175 KG/CM2.+ 30% P.G. EN ESTRIBOS
01.03.03.04 OBRAS DE CONCRETO ARMADO

01.03.03.04.01 SUPER ESTRUCTURA

01.03.03.03.01.01 01.03.03.04.01.01 ENCOFRADO Y DESENCOFRADO DE LOSA Y VIGA


01.03.03.04.01.02 CONCRETO F'C=280 KG/CM2 EN LOSA

01.03.03.03.01.02 01.03.03.04.01.03 ACERO DE REFUERZO F'Y=4200 KG/CM2

01.03.03.04.02 CARPINTERIA METALICA

01.03.03.03.01.03 01.03.03.04.02.01 COLOCACIÓN DE BARANDAS METÁLICAS


01.03.03.04.03 SISTEMA DE EVACUACION PLUVIAL
01.03.03.04.03.01 TUBOS DE DRENAJE D=3" L=0.50 M
01.03.03.03.02.01 01.03.03.04.04 VARIOS

01.03.03.04.04.01 NEOPRENE E=1", 0.50Mx5.20M.

01.03.03.03.02.02 01.03.03.04.04.02 JUNTAS DE TEKCNOPOR


01.03.03.04.04.03 LIMPIEZA FINAL DE OBRA

01.03.03.04.01.01
01.03.03.04.01.02

01.03.03.04.01.03

01.03.03.04.02.01

01.03.03.04.03.01

01.03.03.04.04.01

01.03.03.04.04.02

01.03.03.04.04.03
M. PROG 0+323 KM

A 1.20X1.10M P/DESVIO TRANSITO VEHICULAR

RANTE LA OBRA

UCTURA EN MATERIAL SUELTO, EN SECO


UCTURA EN MATERIAL SUELTO, EN AGUA

N TERRENO NORMAL

CON MATERIAL PROPIO

AL EXCEDENTE

S CONCRETO F'C=140 KG/CM2 E=10CM.

COFRADO PARA ZAPATAS

G/CM2.+ 30% P.G. EN ZAPATAS

COFRADO DE ESTRIBOS
G/CM2.+ 30% P.G. EN ESTRIBOS

COFRADO DE LOSA Y VIGA


/CM2 EN LOSA
F'Y=4200 KG/CM2

NDAS METÁLICAS
0+000 al 1+000
700.00

600.00

500.00

400.00

300.00

200.00

100.00

0.00
0+0 0+0 0+0 0+0 0+0 0+1 0+1 0+1 0+1 0+1 0+2 0+2 0+2 0+2 0+2 0+3 0+3 0+3 0+3 0+3 0+4 0+4 0+4 0+4 0+4 0+5 0+5 0+5 0+5 0+5 0+6 0+6 0+6 0+6 0+6 0+7 0+7 0+7 0+7 0+7 0+8 0+8 0+8 0+8 0+8 0+9 0+9 0+9 0+9 0+9 1+0
00. 20. 40. 60. 80. 00. 20. 40. 60. 80. 00. 20. 40. 60. 80. 00. 20. 40. 60. 80. 00. 20. 40. 60. 80. 00. 20. 40. 60. 80. 00. 20. 40. 60. 80. 00. 20. 40. 60. 80. 00. 20. 40. 60. 80. 00. 20. 40. 60. 80. 00.
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
-100.00

-200.00

-300.00
0+000.00 20.50 580.666667 58.07 29.0333333 580.666667
0+020.00 37.57 1347 702
0+040.00 -87.96 -3148.66667 806
0+060.00 -226.91 -2917 580
0+080.00 -64.79
0+100.00 191.80 4197.22222
0+120.00 227.92 3741.66667
0+140.00 146.24 2433.66667
0+160.00 97.12 1802.11111
0+180.00 83.09 1600.77778
0+200.00 76.99 1519
0+220.00 74.91 1777.22222
0+240.00 102.81 2793.11111
0+260.00 176.50 4074
0+280.00 230.90 4182.33333
0+300.00 187.33 2864
0+320.00 99.07 1794.88889
0+340.00 80.42 1639.11111
0+360.00 83.49 1275
0+380.00 44.01 561.555556
0+400.00 12.14 146.444444
0+420.00 2.50 536
0+440.00 51.10 2019.33333
0+460.00 150.83 3221.33333
0+480.00 171.30 3441
0+500.00 172.80 4995
0+520.00 326.70 8590 2500.00
0+540.00 532.30 11482
0+560.00 615.90 11711 2000.00
0+580.00 555.20
0+600.00 310.43 1500.00

0+620.00 -11.97
1000.00
0+640.00 -128.76
0+660.00 21.72
500.00
0+680.00 258.48
0+700.00 389.20 0.00
0+720.00 378.40 1+000.00 1+020.00 1+040.00 1+060.00 1+080.00

0+740.00 370.50 -500.00


0+760.00 393.80
0+780.00 309.60
0+800.00 164.60
0+820.00 111.90 1200.00
0+840.00 219.30
0+860.00 299.70 1000.00
0+880.00 178.00
800.00
0+900.00 98.60
0+920.00 105.06
600.00
0+940.00 59.90
400.00

200.00

0.00
800.00

600.00

0+960.00 52.28 400.00


0+980.00 113.18
1+000.00 185.39 200.00
1+020.00 228.89
203.42 0.00
1+040.00 2+000.00 2+020.00 2+040.00 2+060.00 2+080.00
1+060.00 100.87
1+080.00 14.31
1+100.00 30.43
1+120.00 126.71
1+140.00 233.70
1+160.00 306.60
1+180.00 390.50
1+200.00 428.00
1+220.00 332.30
1+240.00 248.60
1+260.00 246.20
1+280.00 246.20
1+300.00 191.20
1+320.00 45.92
1+340.00 -56.59
1+360.00 22.86
1+380.00 151.77
1+400.00 229.60
1+420.00 296.60
1+440.00 318.10
1+460.00 297.20
1+480.00 196.24
1+500.00 -22.26
1+520.00 -144.56
1+540.00 -67.37
1+560.00 66.19
1+580.00 193.90
1+600.00 342.20
1+620.00 522.80
1+640.00 664.90
1+660.00 708.40
1+680.00 712.20
1+700.00 704.50
1+720.00 747.20
1+740.00 904.30
1+760.00 1050.60
1+780.00 1181.40
1+800.00 1405.00
1+820.00 1711.80
1+840.00 1915.80
1+860.00 1946.20
1+880.00 1924.00
1+900.00 1614.40
1+920.00 1075.80
1+940.00 686.10
1+960.00 385.19
1+980.00 143.28
2+000.00 57.39
2+020.00 64.50
2+040.00 79.00
2+060.00 90.30
2+080.00 101.10
2+100.00 113.30
2+120.00 139.60
2+140.00 162.80
2+160.00 177.70
2+180.00 240.60
2+200.00 417.00
2+220.00 715.30
2+240.00 1013.40
2+260.00 1080.40
2+280.00 883.10
2+300.00 591.00
2+320.00 343.70
2+340.00 263.80
2+360.00 297.40
2+380.00 313.30
2+400.00 325.60
2+420.00 326.80
2+440.00 289.10
2+460.00 264.70
2+480.00 270.60
2+500.00 273.10
2+520.00 267.70
2+540.00 257.40
2+560.00 241.50
2+580.00 236.80
2+600.00 244.30
2+620.00 237.10
2+640.00 248.30
2+660.00 334.40
2+680.00 369.20
2+700.00 241.10
2+720.00 115.80
2+740.00 89.84
2+760.00 82.49
2+780.00 84.20
2+800.00 112.01
2+820.00 178.16
2+840.00 284.60
2+860.00 399.40
2+880.00 526.90
2+900.00 682.10
2+920.00 835.70
2+940.00 909.60
2+960.00 845.30
2+980.00 682.80
3+000.00 530.00
3+020.00 377.10
3+040.00 189.80
3+060.00 140.40
3+080.00 304.20
3+100.00 528.30
3+120.00 568.90
3+140.00 342.10
3+160.00 128.20
3+180.00 84.20
3+200.00 95.70
3+220.00 82.64
3+240.00 36.54
3+260.00 22.06
3+280.00 56.96
3+300.00 78.50
3+320.00 80.70
3+340.00 106.50
3+360.00 134.50
3+380.00 136.40
3+400.00 159.70
3+420.00 184.50
3+440.00 162.20
3+460.00 116.50
3+480.00 96.90
3+500.00 111.20
3+520.00 134.00
3+540.00 185.80
3+560.00 235.80
3+580.00 214.60
3+600.00 150.80
3+620.00 106.30
3+640.00 97.70
3+660.00 111.30
3+680.00 123.50
3+700.00 119.50
3+720.00 132.50
3+740.00 170.60
3+760.00 223.70
3+780.00 243.00
3+800.00 168.60
3+820.00 112.90 1200.00

1000.00

800.00

600.00
1200.00
3+840.00 112.70
1000.00
3+860.00 102.10
3+880.00 95.10 800.00
3+900.00 104.10
600.00
3+920.00 124.20
3+940.00 139.00 400.00
3+960.00 141.10
3+980.00 140.30 200.00
4+000.00 141.30
0.00
4+020.00 132.50 4+000.00 4+020.00 4+040.00 4+060.00 4+080.00 4+100.00 4+12
4+040.00 111.70 -200.00
4+060.00 116.50
4+080.00 165.50
4+100.00 196.80
4+120.00 158.40
4+140.00 133.30 800.00
4+160.00 209.50
600.00
4+180.00 347.30
4+200.00 608.90 400.00
4+220.00 952.90
4+240.00 1026.80 200.00

4+260.00 742.30
0.00
4+280.00 351.53 5+000.00 5+020.00 5+040.00 5+060.00 5+080.00 5+100.00 5
4+300.00 45.94 -200.00
4+320.00 -88.47
-400.00
4+340.00 -30.73
4+360.00 145.64 -600.00
4+380.00 333.30
4+400.00 423.10
4+420.00 346.60
4+440.00 236.20
4+460.00 266.70 800.00
4+480.00 347.60 700.00
4+500.00 312.30 600.00
4+520.00 201.70
500.00
4+540.00 95.10
400.00
4+560.00 36.30
300.00
4+580.00 11.80
4+600.00 -16.33 200.00

4+620.00 17.93 100.00


4+640.00 82.27 0.00
6+000.00 6+020.00 6+040.00 6+060.00 6+080.00 6+100.00 6
4+660.00 112.20 -100.00
4+680.00 159.50 -200.00
4+700.00 252.50
4+720.00 369.20
4+740.00 453.70
4+760.00 417.10
4+780.00 268.73
4+800.00 102.74
4+820.00 -19.67
4+840.00 -75.22
4+860.00 -105.33
4+880.00 -82.59
4+900.00 77.60
4+920.00 390.50
4+940.00 653.40
4+960.00 552.40
4+980.00 254.70
5+000.00 84.14
5+020.00 22.93
5+040.00 48.33
5+060.00 132.24
5+080.00 69.60
5+100.00 -9.00
5+120.00 142.90
5+140.00 257.70
5+160.00 295.70
5+180.00 474.20
5+200.00 603.30
5+220.00 488.30
5+240.00 275.00
5+260.00 119.60
5+280.00 49.94
5+300.00 65.99
5+320.00 149.44
5+340.00 242.40
5+360.00 392.40
5+380.00 540.10
5+400.00 438.97
5+420.00 162.60
5+440.00 -54.93
5+460.00 -152.24
5+480.00 -252.81
5+500.00 -364.20
5+520.00 -127.64
5+540.00 376.22
5+560.00 626.40
5+580.00 599.40
5+600.00 401.03
5+620.00 67.82
5+640.00 -105.27
5+660.00 4.20
5+680.00 229.12
5+700.00 462.77
5+720.00 598.80
5+740.00 560.70
5+760.00 357.37
5+780.00 116.80
5+800.00 7.33
5+820.00 41.53
5+840.00 175.93
5+860.00 282.70
5+880.00 273.60
5+900.00 205.30
5+920.00 108.92
5+940.00 10.86
5+960.00 7.34
5+980.00 123.11
6+000.00 234.50
6+020.00 244.00
6+040.00 175.40
6+060.00 110.20
6+080.00 106.60
6+100.00 161.80
6+120.00 217.00
6+140.00 204.90
6+160.00 97.06
6+180.00 -28.81
6+200.00 -44.30
6+220.00 88.16
6+240.00 341.19
6+260.00 560.90
6+280.00 560.90
6+300.00 421.50
6+320.00 301.10
6+340.00 188.61
6+360.00 87.99
6+380.00 38.53
6+400.00 34.58
6+420.00 26.44
6+440.00 23.11
6+460.00 99.89
6+480.00 213.00
6+500.00 314.00
6+520.00 406.70
6+540.00 488.70
6+560.00 449.40
6+580.00 264.40
6+600.00 130.70
6+620.00 52.11
6+640.00 -55.54
6+660.00 -96.98
6+680.00 10.92
6+700.00 214.74
6+720.00 455.90
6+740.00 654.00
6+760.00 722.80
6+780.00 708.60
6+800.00 651.50
6+820.00 510.40
700.00
6+840.00 295.50
600.00
6+860.00 123.73
6+880.00 92.27 500.00
6+900.00 157.73 400.00
6+920.00 185.10
300.00
6+940.00 118.50
200.00
6+960.00 77.30
6+980.00 110.50 100.00

7+000.00 125.00 0.00


7+000.00 7+020.00 7+040.00 7+060.00 7+080.00 7+100.00 7
7+020.00 110.10 -100.00
7+040.00 164.30
-200.00
7+060.00 395.00
7+080.00 620.90
7+100.00 522.50
7+120.00 289.20
7+140.00 188.26
7+160.00 114.84
7+180.00 60.81
7+200.00 55.87
7+220.00 61.30
7+240.00 72.36
7+260.00 74.70
7+280.00 86.90
7+300.00 105.00
7+320.00 97.69
7+340.00 75.28
7+360.00 53.84
7+380.00 48.30
7+400.00 60.63
7+420.00 66.39
7+440.00 75.10
7+460.00 87.60
7+480.00 91.60
7+500.00 86.21
7+520.00 64.71
7+540.00 48.68
7+560.00 64.07
7+580.00 94.39
7+600.00 111.70
7+620.00 127.60
7+640.00 139.10
7+660.00 124.60
7+680.00 106.80
7+700.00 112.60
7+720.00 125.20
7+740.00 125.30
7+760.00 114.60
7+780.00 96.04
7+800.00 86.69
7+820.00 91.74
7+840.00 105.70
7+860.00 117.30
7+880.00 112.20
7+900.00 110.80
7+920.00 140.40
7+940.00 181.70
7+960.00 169.00
7+980.00 119.28
8+000.00 -107.18
8+020.00 -330.68
8+040.00 -125.41
8+060.00 128.81
8+080.00 164.70
8+100.00 174.50
8+120.00 161.80 1400.00
8+140.00 109.97 1200.00
8+160.00 71.23 1000.00
8+180.00 82.57 800.00
8+200.00 128.10 600.00
8+220.00 194.50
400.00
8+240.00 253.70
200.00
8+260.00 254.90
0.00
8+280.00 193.80 8+000.00 8+020.00 8+040.00 8+060.00 8+080.00 8+100.00 8+
8+300.00 116.76 -200.00

8+320.00 62.28 -400.00


8+340.00 48.39 -600.00
8+360.00 66.07
8+380.00 87.70
8+400.00 98.30
8+420.00 142.70
8+440.00 248.10
8+460.00 250.19
8+480.00 126.78
8+500.00 100.76
8+520.00 14.51
8+540.00 -91.58
8+560.00 222.38
8+580.00 812.30
8+600.00 1173.20
8+620.00 1082.30
8+640.00 768.90
8+660.00 458.90
8+680.00 127.34
8+700.00 -126.29
8+720.00 -178.78
8+740.00 -119.56
8+760.00 -7.36
8+780.00 169.06
8+800.00 323.50
8+820.00 341.40
8+840.00 203.53
8+860.00 70.20
8+880.00 50.50
8+900.00 109.43
8+920.00 196.30
8+940.00 216.80
8+960.00 145.50
8+980.00 82.60
1800.00
9+000.00 90.90
1600.00
9+020.00 152.70
9+040.00 241.90 1400.00

9+060.00 353.80 1200.00


9+080.00 461.30 1000.00
9+100.00 598.00 800.00
9+120.00 902.10 600.00
9+140.00 1328.90 400.00
9+160.00 1568.60
200.00
9+180.00 1492.10
0.00
9+200.00 1297.10 9+000.00 9+020.00 9+040.00 9+060.00 9+080.00 9+100.00 9
-200.00
9+220.00 1076.90
9+240.00 1007.90
9+260.00 1336.10
9+280.00 1555.70
9+300.00 1172.70
9+320.00 594.90
9+340.00 221.00
9+360.00 73.87
9+380.00 77.23
9+400.00 107.67
9+420.00 108.90
9+440.00 93.30
9+460.00 81.20
9+480.00 140.10
9+500.00 372.10
9+520.00 713.80
9+540.00 898.80
9+560.00 833.60
9+580.00 692.50
9+600.00 591.40
9+620.00 516.40
9+640.00 410.00
9+660.00 277.60
9+680.00 159.30
9+700.00 100.20
9+720.00 143.90
9+740.00 243.50
9+760.00 310.60
9+780.00 286.40
9+800.00 205.30
9+820.00 121.97
9+840.00 78.83
9+860.00 84.00
9+880.00 44.96
9+900.00 -46.64
9+920.00 -16.42
9+940.00 79.96
9+960.00 127.62
9+980.00 298.71
600.00
10+000.00 395.00
10+020.00 224.20 500.00
10+040.00 144.73 400.00
10+060.00 215.17
300.00
10+080.00 261.43
10+100.00 395.70 200.00
10+120.00 525.40
100.00
10+140.00 518.50
10+160.00 460.80 0.00
10+000.00 10+020.00 10+040.00 10+060.00 10+080.00 10+100.00
10+180.00 345.60 -100.00
10+200.00 204.50
-200.00
10+220.00 102.19
10+240.00 49.38
10+260.00 86.09
10+280.00 195.70
10+300.00 252.90
10+320.00 183.03
10+340.00 63.57
10+360.00 10.67
10+380.00 39.37
10+400.00 25.91
10+420.00 -2.18
10+440.00 98.71
10+460.00 186.37
10+480.00 264.10
10+500.00 443.20
10+520.00 507.40
10+540.00 405.40
10+560.00 278.80
10+580.00 151.47
10+600.00 91.63
10+620.00 123.07
10+640.00 130.00
10+660.00 97.00
10+680.00 97.30
10+700.00 101.36
10+720.00 102.91
10+740.00 126.04
10+760.00 131.97
10+780.00 185.37
10+800.00 357.99
10+820.00 506.40
10+840.00 456.70
10+860.00 346.10
10+880.00 376.20
10+900.00 426.10 1000.00

10+920.00 333.70 800.00


10+940.00 181.74
10+960.00 62.99 600.00
10+980.00 -47.27
400.00
11+000.00 -99.41
11+020.00 -24.89 200.00
11+040.00 102.31
162.60 0.00
11+060.00 11+000.00 11+020.00 11+040.00 11+060.00 11+080.00 11+100.00
11+080.00 154.80 -200.00
11+100.00 123.19
11+120.00 47.08 -400.00
11+140.00 -34.48
11+160.00 59.37
11+180.00 332.93
11+200.00 619.20
11+220.00 841.50
11+240.00 372.86
11+260.00 -286.89
11+280.00 -31.01
11+300.00 189.39
11+320.00 1.16
11+340.00 -39.24
11+360.00 27.93
11+380.00 198.58
11+400.00 401.40
11+420.00 550.70
11+440.00 671.20
11+460.00 707.40
11+480.00 539.48
11+500.00 275.54
11+520.00 138.36
11+540.00 118.09
11+560.00 134.20
11+580.00 172.80
11+600.00 170.60
11+620.00 130.00
11+640.00 109.90
11+660.00 108.60
11+680.00 94.00
11+700.00 71.00
11+720.00 57.90
11+740.00 40.76
11+760.00 21.90
11+780.00 50.63
11+800.00 113.73
11+820.00 144.99
11+840.00 147.14
11+860.00 133.84
11+880.00 113.29
11+900.00 101.24
11+920.00 96.10
11+940.00 93.90
11+960.00 83.86
11+980.00 68.50
12+000.00 62.13
12+020.00 72.79
12+040.00 87.40
12+060.00 89.90 450.00
12+080.00 89.29 400.00
12+100.00 80.97 350.00
12+120.00 69.26
300.00
12+140.00 71.66
250.00
12+160.00 70.51
12+180.00 52.47 200.00

12+200.00 47.92 150.00


12+220.00 64.27 100.00
12+240.00 88.96 50.00
12+260.00 104.31
0.00
12+280.00 81.80 12+000.00 12+020.00 12+040.00 12+060.00 12+080.00 12+100.00 12+
12+300.00 63.04
12+320.00 74.48
12+340.00 74.59
12+360.00 58.31
12+380.00 49.14
12+400.00 66.16
12+420.00 134.83
12+440.00 177.50
12+460.00 132.10
12+480.00 97.84
12+500.00 93.71
12+520.00 75.86
12+540.00 62.04
12+560.00 80.44
12+580.00 187.89
12+600.00 271.50
12+620.00 199.60
12+640.00 138.40
12+660.00 185.30
12+680.00 234.80
12+700.00 209.60
12+720.00 167.40
12+740.00 158.90
12+760.00 137.40
12+780.00 118.10
12+800.00 140.50
12+820.00 240.80
12+840.00 341.90
12+860.00 323.90
12+880.00 344.70
12+900.00 417.00
12+920.00 349.00
12+940.00 284.70
12+960.00 329.40
12+980.00 338.86
13+000.00 267.81
13+020.00 200.46
13+040.00 212.10
13+060.00 264.90
600.00
13+080.00 293.60
500.00
13+100.00 370.70
400.00
13+120.00 460.40
13+140.00 357.20 300.00

13+160.00 76.70 200.00


13+180.00 -192.86 100.00
13+200.00 -281.56 0.00
13+000.00 13+020.00 13+040.00 13+060.00 13+080.00 13+100.00 13
13+220.00 -183.22 -100.00
13+240.00 -50.64 -200.00
13+260.00 51.43
-300.00
13+280.00 156.26
-400.00
13+300.00 273.40
13+320.00 333.00
13+340.00 304.30
13+360.00 249.20
13+380.00 209.10
13+400.00 202.00
13+420.00 191.69
13+440.00 145.79
13+460.00 96.92
13+480.00 66.53
13+500.00 71.61
13+520.00 124.30
13+540.00 168.30
13+560.00 160.09
13+580.00 157.18
13+600.00 168.89
13+620.00 169.70
13+640.00 176.40
13+660.00 193.00
13+680.00 214.60
13+700.00 240.40
13+720.00 257.30
13+740.00 252.60
13+760.00 238.30
13+780.00 258.00
13+800.00 308.80
13+820.00 316.20
13+840.00 270.50
13+860.00 215.80
13+880.00 171.40
13+900.00 136.40
13+920.00 115.80
13+940.00 142.10
13+960.00 182.30
13+980.00 132.32
14+000.00 58.34
14+020.00 67.12
14+040.00 95.50 100000
14+060.00 114.60
14+080.00 164.00 80000
14+100.00 329.90
14+120.00 459.10 60000
14+140.00 370.40
14+160.00 282.80 40000
14+180.00 262.30
256.20 20000
14+200.00
14+220.00 277.10
0
14+240.00 255.10 14+000 14+020 14+040 14+060 14+080 14+100 14+
14+260.00 232.50
-20000
14+280.00 228.17
14+300.00 157.11
14+320.00 121.52
14+340.00 137.56
14+360.00 77.09
14+380.00 25.90
14+400.00 -15.74
14+420.00 -31.99
14+440.00 69.64
14+460.00 212.87
14+480.00 219.82
14+500.00 31.56
14+520.00 -55.46
14+540.00 186.44
14+560.00 459.40
14+580.00 426.90
14+600.00 324.40
14+620.00 360.50
14+640.00 401.70
14+660.00 351.40
14+680.00 214.00
14+700.00 132.60
14+720.00 138.10
14+740.00 102.84
14+760.00 100.39
14+780.00 216.54
14+800.00 322.40
14+820.00 373.70
14+840.00 407.50
14+860.00 434.30
14+880.00 532.70
14+900.00 700.60
14+920.00 728.60
14+940.00 532.30
14+960.00 213.41
14+980.00 -77.82
15+000.00 -139.63
15+020.00 -8.06
15+040.00 89462.21
268277.00
104

700
600
500
400
300
200
100
0
0+000 0+020 0+040 0+060 0+080 0+100 0+120 0+140 0+160
-100
-200
-300

0.00 1+060.00 1+080.00 1+100.00 1+120.00 1+140.00 1+160.00 1+180.00 1+200.00 1+220.00 1+240.00 1+260.00 1+280
0.00 2+060.00 2+080.00 2+100.00 2+120.00 2+140.00 2+160.00 2+180.00 2+200.00 2+220.00 2+240.00 2+260.00 2+280
4+080.00 4+100.00 4+120.00 4+140.00 4+160.00 4+180.00 4+200.00 4+220.00 4+240.00 4+260.00 4+280.00 4+300.00

0 5+080.00 5+100.00 5+120.00 5+140.00 5+160.00 5+180.00 5+200.00 5+220.00 5+240.00 5+260.00 5+280.00 5+300.00

0 6+080.00 6+100.00 6+120.00 6+140.00 6+160.00 6+180.00 6+200.00 6+220.00 6+240.00 6+260.00 6+280.00 6+300.00
00 7+080.00 7+100.00 7+120.00 7+140.00 7+160.00 7+180.00 7+200.00 7+220.00 7+240.00 7+260.00 7+280.00 7+300.00
0 8+080.00 8+100.00 8+120.00 8+140.00 8+160.00 8+180.00 8+200.00 8+220.00 8+240.00 8+260.00 8+280.00 8+300.00
00 9+080.00 9+100.00 9+120.00 9+140.00 9+160.00 9+180.00 9+200.00 9+220.00 9+240.00 9+260.00 9+280.00 9+300.00
0.00 10+080.00 10+100.00 10+120.00 10+140.00 10+160.00 10+180.00 10+200.00 10+220.00 10+240.00 10+260.00 10+280.00 10+300.
0.00 11+080.00 11+100.00 11+120.00 11+140.00 11+160.00 11+180.00 11+200.00 11+220.00 11+240.00 11+260.00 11+280.00 11+300
12+080.00 12+100.00 12+120.00 12+140.00 12+160.00 12+180.00 12+200.00 12+220.00 12+240.00 12+260.00 12+280.00 12+300.00
00 13+080.00 13+100.00 13+120.00 13+140.00 13+160.00 13+180.00 13+200.00 13+220.00 13+240.00 13+260.00 13+280.00 13+300.00
14+080 14+100 14+120 14+140 14+160 14+180 14+200 14+220 14+240 14+260 14+280 14+300 14
120 0+140 0+160 0+180 0+200 0+220 0+240 0+260 0+280 0+300 0+320 0+340 0+3

DIAGRAMA DE CURVA

1+240.00 1+260.00 1+280.00 1+300.00 1+320.00 1+340.00 1+360.00 1+380.00 1+400.00 1+420.00 1+440.00 1+460.00 1

DIAGRAMA DE CURVA
2+240.00 2+260.00 2+280.00 2+300.00 2+320.00 2+340.00 2+360.00 2+380.00 2+400.00 2+420.00 2+440.00 2+460.00 2
DIAGRAMA DE CURVA MASA DEL T
DIAGRAMA DE CURVA MASA DEL T

.00 4+280.00 4+300.00 4+320.00 4+340.00 4+360.00 4+380.00 4+400.00 4+420.00 4+440.00 4+460.00 4+480.00 4+500.0

DIAGRAMA DE CURVA MASA DEL

260.00 5+280.00 5+300.00 5+320.00 5+340.00 5+360.00 5+380.00 5+400.00 5+420.00 5+440.00 5+460.00 5+480.00 5+5

DIAGRAMA DE CURVA MASA DEL

260.00 6+280.00 6+300.00 6+320.00 6+340.00 6+360.00 6+380.00 6+400.00 6+420.00 6+440.00 6+460.00 6+480.00 6+5
DIAGRAMA DE CURVA MASA DE

+260.00 7+280.00 7+300.00 7+320.00 7+340.00 7+360.00 7+380.00 7+400.00 7+420.00 7+440.00 7+460.00 7+480.00 7+5
DIAGRAMA DE CURVA MASA DEL

60.00 8+280.00 8+300.00 8+320.00 8+340.00 8+360.00 8+380.00 8+400.00 8+420.00 8+440.00 8+460.00 8+480.00 8+50
DIAGRAMA DE CURVA MASA DEL

+260.00 9+280.00 9+300.00 9+320.00 9+340.00 9+360.00 9+380.00 9+400.00 9+420.00 9+440.00 9+460.00 9+480.00 9+5
DIAGRAMA DE CURVA MASA DEL

0+260.00 10+280.00 10+300.00 10+320.00 10+340.00 10+360.00 10+380.00 10+400.00 10+420.00 10+440.00 10+460.00 10+480.00 10
DIAGRAMA DE CURVA MASA DEL

1+260.00 11+280.00 11+300.00 11+320.00 11+340.00 11+360.00 11+380.00 11+400.00 11+420.00 11+440.00 11+460.00 11+480.00 11
DIAGRAMA DE CURVA MASA DEL T

60.00 12+280.00 12+300.00 12+320.00 12+340.00 12+360.00 12+380.00 12+400.00 12+420.00 12+440.00 12+460.00 12+480.00 12+50
DIAGRAMA DE CURVA MASA DEL T

260.00 13+280.00 13+300.00 13+320.00 13+340.00 13+360.00 13+380.00 13+400.00 13+420.00 13+440.00 13+460.00 13+480.00 13+5
DIAGRAMA DE CURVA MASA DEL

14+280 14+300 14+320 14+340 14+360 14+380 14+400 14+420 14+440 14+460 14+480 14+500 14
DIAGRAMA DE CURVA MASA DEL TRAMO I DEL 0+000

0+320 0+340 0+360 0+380 0+400 0+420 0+440 0+460 0+480 0+500 0+520 0+540

DIAGRAMA DE CURVA MASA DEL TRAMO I DEL 1+000 AL 2+000

0 1+440.00 1+460.00 1+480.00 1+500.00 1+520.00 1+540.00 1+560.00 1+580.00 1+600.00 1+620.00 1+640.00 1+660.00

DIAGRAMA DE CURVA MASA DEL TRAMO I DEL 2+000 AL 3+000


0 2+440.00 2+460.00 2+480.00 2+500.00 2+520.00 2+540.00 2+560.00 2+580.00 2+600.00 2+620.00 2+640.00 2+660.00
E CURVA MASA DEL TRAMO I DEL 4+000 AL 5+000
E CURVA MASA DEL TRAMO I DEL 4+000 AL 5+000

4+460.00 4+480.00 4+500.00 4+520.00 4+540.00 4+560.00 4+580.00 4+600.00 4+620.00 4+640.00 4+660.00 4+680.00 4+

A DE CURVA MASA DEL TRAMO I DEL 5+000 AL 6+000

5+460.00 5+480.00 5+500.00 5+520.00 5+540.00 5+560.00 5+580.00 5+600.00 5+620.00 5+640.00 5+660.00 5+680.00

A DE CURVA MASA DEL TRAMO I DEL 6+000 AL 7+000

6+460.00 6+480.00 6+500.00 6+520.00 6+540.00 6+560.00 6+580.00 6+600.00 6+620.00 6+640.00 6+660.00 6+680.00
A DE CURVA MASA DEL TRAMO I DEL 7+000 AL 8+000

7+460.00 7+480.00 7+500.00 7+520.00 7+540.00 7+560.00 7+580.00 7+600.00 7+620.00 7+640.00 7+660.00 7+680.00
DE CURVA MASA DEL TRAMO I DEL 8+000 AL 9+000

8+460.00 8+480.00 8+500.00 8+520.00 8+540.00 8+560.00 8+580.00 8+600.00 8+620.00 8+640.00 8+660.00 8+680.00
DE CURVA MASA DEL TRAMO I DEL 9+000 AL 10+000

9+460.00 9+480.00 9+500.00 9+520.00 9+540.00 9+560.00 9+580.00 9+600.00 9+620.00 9+640.00 9+660.00 9+680.00
A DE CURVA MASA DEL TRAMO I DEL 10+000 AL 11+000

0 10+460.00 10+480.00 10+500.00 10+520.00 10+540.00 10+560.00 10+580.00 10+600.00 10+620.00 10+640.00 10+660.00 10+680.00
A DE CURVA MASA DEL TRAMO I DEL 11+000 AL 12+000

0 11+460.00 11+480.00 11+500.00 11+520.00 11+540.00 11+560.00 11+580.00 11+600.00 11+620.00 11+640.00 11+660.00 11+680.00
DE CURVA MASA DEL TRAMO I DEL 12+000 AL 13+000

12+460.00 12+480.00 12+500.00 12+520.00 12+540.00 12+560.00 12+580.00 12+600.00 12+620.00 12+640.00 12+660.00 12+680.00
DE CURVA MASA DEL TRAMO I DEL 13+000 AL 14+000

13+460.00 13+480.00 13+500.00 13+520.00 13+540.00 13+560.00 13+580.00 13+600.00 13+620.00 13+640.00 13+660.00 13+680.00
DE CURVA MASA DEL TRAMO I DEL 14+000AL 15+000

14+480 14+500 14+520 14+540 14+560 14+580 14+600 14+620 14+640 14+660 14+680 14+700 1
L TRAMO I DEL 0+000 AL 1+000

00 0+520 0+540 0+560 0+580 0+600 0+620 0+640 0+660 0+680 0+700 0+720 0+7

620.00 1+640.00 1+660.00 1+680.00 1+700.00 1+720.00 1+740.00 1+760.00 1+780.00 1+800.00 1+820.00 1+840.00 1+8
620.00 2+640.00 2+660.00 2+680.00 2+700.00 2+720.00 2+740.00 2+760.00 2+780.00 2+800.00 2+820.00 2+840.00 2+8
0 4+660.00 4+680.00 4+700.00 4+720.00 4+740.00 4+760.00 4+780.00 4+800.00 4+820.00 4+840.00 4+860.00 4+880.00

0.00 5+660.00 5+680.00 5+700.00 5+720.00 5+740.00 5+760.00 5+780.00 5+800.00 5+820.00 5+840.00 5+860.00 5+880

0.00 6+660.00 6+680.00 6+700.00 6+720.00 6+740.00 6+760.00 6+780.00 6+800.00 6+820.00 6+840.00 6+860.00 6+880
40.00 7+660.00 7+680.00 7+700.00 7+720.00 7+740.00 7+760.00 7+780.00 7+800.00 7+820.00 7+840.00 7+860.00 7+880
.00 8+660.00 8+680.00 8+700.00 8+720.00 8+740.00 8+760.00 8+780.00 8+800.00 8+820.00 8+840.00 8+860.00 8+880.0
0.00 9+660.00 9+680.00 9+700.00 9+720.00 9+740.00 9+760.00 9+780.00 9+800.00 9+820.00 9+840.00 9+860.00 9+880
640.00 10+660.00 10+680.00 10+700.00 10+720.00 10+740.00 10+760.00 10+780.00 10+800.00 10+820.00 10+840.00 10+860.00 10+88
640.00 11+660.00 11+680.00 11+700.00 11+720.00 11+740.00 11+760.00 11+780.00 11+800.00 11+820.00 11+840.00 11+860.00 11+88
.00 12+660.00 12+680.00 12+700.00 12+720.00 12+740.00 12+760.00 12+780.00 12+800.00 12+820.00 12+840.00 12+860.00 12+880.
0.00 13+660.00 13+680.00 13+700.00 13+720.00 13+740.00 13+760.00 13+780.00 13+800.00 13+820.00 13+840.00 13+860.00 13+880
0 14+680 14+700 14+720 14+740 14+760 14+780 14+800 14+820 14+840 14+860 14+880 14+900 1
0+700 0+720 0+740 0+760 0+780 0+800 0+820 0+840 0+860 0+880 0+900 0+920

1+820.00 1+840.00 1+860.00 1+880.00 1+900.00 1+920.00 1+940.00 1+960.00 1+980.00 2+000.00
2+820.00 2+840.00 2+860.00 2+880.00 2+900.00 2+920.00 2+940.00 2+960.00 2+980.00 3+000.00
40.00 4+860.00 4+880.00 4+900.00 4+920.00 4+940.00 4+960.00 4+980.00 5+000.00

5+840.00 5+860.00 5+880.00 5+900.00 5+920.00 5+940.00 5+960.00 5+980.00 6+000.00

6+840.00 6+860.00 6+880.00 6+900.00 6+920.00 6+940.00 6+960.00 6+980.00 7+000.00


7+840.00 7+860.00 7+880.00 7+900.00 7+920.00 7+940.00 7+960.00 7+980.00 8+000.00
8+840.00 8+860.00 8+880.00 8+900.00 8+920.00 8+940.00 8+960.00 8+980.00 9+000.00
9+840.00 9+860.00 9+880.00 9+900.00 9+920.00 9+940.00 9+960.00 9+980.00 10+000.00
10+840.00 10+860.00 10+880.00 10+900.00 10+920.00 10+940.00 10+960.00 10+980.00 11+000.00
11+840.00 11+860.00 11+880.00 11+900.00 11+920.00 11+940.00 11+960.00 11+980.00 12+000.00
2+840.00 12+860.00 12+880.00 12+900.00 12+920.00 12+940.00 12+960.00 12+980.00 13+000.00
3+840.00 13+860.00 13+880.00 13+900.00 13+920.00 13+940.00 13+960.00 13+980.00 14+000.00
0 14+880 14+900 14+920 14+940 14+960 14+980 15+000 15+020 15+040
80 0+900 0+920 0+940 0+960 0+980 1+000

0.00
0.00
0+000 al 1+000
700.00
600.00
500.00
400.00
300.00
200.00
100.00
0.00
0+000.00 0+020.00 0+040.00 0+060.00 0+080.00 0+100.00 0+120.00 0+140.00 0+160.00 0+180.00 0+200.00 0+220.00 0+240.00 0+260.00 0+280.00 0+300.00 0+320.00 0+340.00 0+360.00 0+380.00 0+400.00 0+420.00 0+440.00 0+460.00 0+480.00 0+500.00 0+520.00 0+540.00 0+560.00 0+580.00 0+600.00 0+620.00 0+640.00 0+660.00 0+680.00 0+700.00 0+720.00 0+740.00 0+760.00 0+780.00 0+800.00 0+820.00 0+840.00 0+860.00 0+880.00 0+900.00 0+920.00 0+940.00 0+960.00 0+980.00 1+000.00
-100.00
-200.00
-300.00
METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

1+000.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+020.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+040.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+060.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+080.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+100.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+120.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+140.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+160.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+180.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+200.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+220.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+240.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+260.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+280.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+300.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+320.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+340.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+360.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+380.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 137 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

1+400.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+420.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+440.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+460.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+480.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+500.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+520.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+540.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+560.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+580.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+600.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+620.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+640.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+660.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+680.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+700.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+720.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+740.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+760.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+780.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+800.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 138 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

1+820.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+840.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+860.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+880.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+900.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+920.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+940.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+960.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

1+980.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+000.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+020.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+040.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+060.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+080.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+100.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+120.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+140.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+160.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+180.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+200.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+220.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 139 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

2+240.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+260.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+280.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+300.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+320.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+340.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+360.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+380.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+400.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+420.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+440.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+460.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+480.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+500.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+520.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+540.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+560.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+580.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+600.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+620.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+640.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 140 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

2+660.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+680.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+700.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+720.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+740.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+760.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+780.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+800.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+820.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+840.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+860.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+880.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+900.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+920.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+940.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+960.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

2+980.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+000.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+020.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+040.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+060.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 141 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

3+080.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+100.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+120.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+140.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+160.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+180.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+200.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+220.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+240.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+260.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+280.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+300.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+320.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+340.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+360.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+380.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+400.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+420.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+440.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+460.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+480.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 142 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

3+500.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+520.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+540.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+560.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+580.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+600.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+620.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+640.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+660.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+680.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+700.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+720.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+740.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+760.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+780.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+800.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+820.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+840.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+860.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+880.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+900.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 143 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

3+920.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+940.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+960.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

3+980.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+000.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+020.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+040.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+060.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+080.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+100.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+120.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+140.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+160.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+180.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+200.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+220.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+240.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+260.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+280.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+300.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+320.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 144 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

4+340.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+360.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+380.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+400.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+420.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+440.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+460.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+480.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+500.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+520.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+540.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+560.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+580.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+600.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+620.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+640.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+660.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+680.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+700.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+720.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+740.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 145 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

4+760.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+780.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+800.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+820.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+840.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+860.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+880.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+900.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+920.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+940.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+960.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

4+980.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+000.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+020.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+040.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+060.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+080.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+100.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+120.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+140.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+160.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 146 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

5+180.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+200.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+220.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+240.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+260.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+280.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+300.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+320.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+340.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+360.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+380.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+400.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+420.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+440.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+460.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+480.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+500.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+520.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+540.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+560.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+580.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 147 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

5+600.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+620.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+640.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+660.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+680.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+700.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+720.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+740.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+760.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+780.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+800.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+820.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+840.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+860.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+880.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+900.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+920.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+940.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+960.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

5+980.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+000.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 148 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

6+020.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+040.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+060.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+080.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+100.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+120.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+140.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+160.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+180.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+200.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+220.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+240.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+260.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+280.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+300.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+320.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+340.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+360.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+380.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+400.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+420.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 149 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

6+440.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+460.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+480.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+500.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+520.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+540.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+560.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+580.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+600.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+620.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+640.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+660.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+680.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+700.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+720.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+740.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+760.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+780.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+800.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+820.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+840.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 150 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

6+860.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+880.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+900.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+920.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+940.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+960.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

6+980.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+000.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+020.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+040.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+060.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+080.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+100.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+120.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+140.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+160.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+180.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+200.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+220.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+240.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+260.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 151 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

7+280.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+300.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+320.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+340.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+360.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+380.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+400.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+420.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+440.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+460.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+480.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+500.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+520.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+540.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+560.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+580.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+600.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+620.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+640.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+660.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+680.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 152 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

7+700.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+720.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+740.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+760.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+780.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+800.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+820.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+840.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+860.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+880.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+900.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+920.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+940.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+960.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

7+980.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+000.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+020.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+040.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+060.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+080.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+100.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 153 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

8+120.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+140.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+160.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+180.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+200.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+220.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+240.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+260.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+280.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+300.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+320.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+340.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+360.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+380.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+400.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+420.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+440.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+460.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+480.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+500.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+520.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 154 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

8+540.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+560.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+580.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+600.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+620.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+640.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+660.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+680.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+700.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+720.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+740.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+760.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+780.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+800.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+820.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+840.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+860.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+880.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+900.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+920.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+940.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 155 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

8+960.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

8+980.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+000.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+020.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+040.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+060.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+080.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+100.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+120.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+140.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+160.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+180.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+200.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+220.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+240.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+260.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+280.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+300.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+320.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+340.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+360.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 156 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

9+380.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+400.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+420.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+440.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+460.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+480.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+500.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+520.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+540.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+560.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+580.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+600.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+620.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+640.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+660.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+680.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+700.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+720.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+740.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+760.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+780.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 157 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

9+800.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+820.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+840.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+860.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+880.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+900.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+920.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+940.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+960.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

9+980.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+000.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+020.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+040.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+060.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+080.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+100.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+120.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+140.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+160.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+180.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+200.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 158 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

10+220.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+240.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+260.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+280.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+300.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+320.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+340.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+360.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+380.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+400.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+420.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+440.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+460.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+480.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+500.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+520.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+540.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+560.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+580.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+600.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+620.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 159 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

10+640.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+660.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+680.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+700.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+720.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+740.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+760.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+780.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+800.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+820.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+840.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+860.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+880.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+900.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+920.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+940.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+960.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

10+980.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+000.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+020.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+040.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 160 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

11+060.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+080.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+100.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+120.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+140.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+160.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+180.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+200.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+220.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+240.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+260.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+280.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+300.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+320.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+340.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+360.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+380.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+400.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+420.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+440.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+460.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 161 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

11+480.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+500.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+520.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+540.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+560.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+580.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+600.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+620.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+640.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+660.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+680.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+700.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+720.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+740.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+760.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+780.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+800.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+820.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+840.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+860.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+880.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 162 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

11+900.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+920.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+940.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+960.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

11+980.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+000.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+020.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+040.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+060.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+080.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+100.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+120.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+140.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+160.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+180.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+200.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+220.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+240.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+260.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+280.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+300.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 163 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

12+320.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+340.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+360.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+380.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+400.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+420.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+440.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+460.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+480.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+500.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+520.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+540.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+560.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+580.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+600.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+620.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+640.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+660.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+680.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+700.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+720.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 164 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

12+740.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+760.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+780.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+800.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+820.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+840.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+860.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+880.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+900.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+920.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+940.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+960.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

12+980.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+000.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+020.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+040.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+060.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+080.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+100.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+120.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+140.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 165 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

13+160.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+180.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+200.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+220.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+240.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+260.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+280.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+300.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+320.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+340.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+360.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+380.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+400.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+420.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+440.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+460.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+480.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+500.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+520.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+540.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+560.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 166 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

13+580.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+600.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+620.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+640.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+660.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+680.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+700.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+720.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+740.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+760.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+780.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+800.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+820.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+840.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+860.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+880.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+900.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+920.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+940.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+960.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

13+980.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 167 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

14+000.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+020.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+040.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+060.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+080.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+100.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+120.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+140.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+160.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+180.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+200.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+220.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+240.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+260.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+280.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+300.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+320.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+340.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+360.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+380.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+400.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 168 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

14+420.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+440.00 100.00% 0.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+460.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+480.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+500.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+520.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+540.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+560.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+580.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+600.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+620.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+640.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+660.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+680.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+700.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+720.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+740.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+760.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+780.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+800.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+820.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

EXPLANACIONES (4) 169 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL
PROYECTO OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL,
CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA -
AYACUCHO”
OBRA

PARTIDA
TRAMO I

M. SUELTO R. SUELTA
PROG. R. FIJA (%) TALUD OBSERVACIONES
(%) (%)

14+840.00 80.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+860.00 100.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+880.00 100.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+900.00 100.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+920.00 100.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+940.00 100.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+960.00 100.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

14+980.00 100.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

15+000.00 100.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

15+020.00 100.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

15+040.00 100.00% 20.00% 100.00% 3:1 DEPOSITO COLUVIAL

T O T A L

EXPLANACIONES (4) 170 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES,
PROYECTO CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN

DIFERENCIA DE ORDENADA
PROG. DIST. RELLENO
RELLENO VOLUMENES DE MASAS
CORTE (M2) CORTE (M3) RELLENO I.C=0.90 (M3)
(M2)
VRA=VR/IC

10+000.00 20.00 13.91 0.00 221.20 0.00 0.00 221.20 395.00

10+020.00 20.00 4.92 0.00 173.80 0.00 0.00 173.80 224.20


10+040.00 20.00 1.41 0.54 58.40 7.20 8.00 50.40 144.73

10+060.00 20.00 10.18 0.31 107.00 11.40 12.67 94.33 215.17

10+080.00 20.00 3.41 0.00 125.50 4.20 4.67 120.83 261.43

10+100.00 20.00 11.82 0.00 140.60 0.00 0.00 140.60 395.70

10+120.00 20.00 15.82 0.00 255.10 0.00 0.00 255.10 525.40


10+140.00 20.00 13.46 0.00 270.30 0.00 0.00 270.30 518.50

10+160.00 20.00 13.42 0.00 248.20 0.00 0.00 248.20 460.80

10+180.00 20.00 9.61 0.00 212.60 0.00 0.00 212.60 345.60

10+200.00 20.00 4.80 0.00 133.00 0.00 0.00 133.00 204.50

10+220.00 20.00 2.95 0.00 71.50 0.00 0.00 71.50 102.19


10+240.00 20.00 0.71 0.21 33.80 2.80 3.11 30.69 49.38

10+260.00 20.00 1.76 0.06 22.80 3.70 4.11 18.69 86.09

10+280.00 20.00 5.66 0.00 68.40 0.90 1.00 67.40 195.70

10+300.00 20.00 8.24 0.00 128.30 0.00 0.00 128.30 252.90

10+320.00 20.00 5.25 0.00 124.60 0.00 0.00 124.60 183.03


10+340.00 20.00 1.36 0.18 61.10 2.40 2.67 58.43 63.57

10+360.00 20.00 1.43 1.21 25.80 18.60 20.67 5.13 10.67

EXPLANACIONES (3) 171 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES,
PROYECTO CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN

DIFERENCIA DE ORDENADA
PROG. DIST. RELLENO
RELLENO VOLUMENES DE MASAS
CORTE (M2) CORTE (M3) RELLENO I.C=0.90 (M3)
(M2)
VRA=VR/IC

10+380.00 20.00 1.73 0.38 29.20 21.30 23.67 5.53 39.37

10+400.00 20.00 2.55 0.00 39.50 5.10 5.67 33.83 25.91


10+420.00 20.00 3.23 4.13 53.30 55.10 61.22 -7.92 -2.18

10+440.00 20.00 4.17 0.09 68.30 56.30 62.56 5.74 98.71

10+460.00 20.00 6.04 0.00 94.30 1.20 1.33 92.97 186.37

10+480.00 20.00 4.07 0.00 93.40 0.00 0.00 93.40 264.10

10+500.00 20.00 14.42 0.00 170.70 0.00 0.00 170.70 443.20


10+520.00 20.00 15.10 0.00 272.50 0.00 0.00 272.50 507.40

10+540.00 20.00 10.34 0.00 234.90 0.00 0.00 234.90 405.40

10+560.00 20.00 8.12 0.00 170.50 0.00 0.00 170.50 278.80

10+580.00 20.00 3.61 0.00 108.30 0.00 0.00 108.30 151.47

10+600.00 20.00 1.10 0.02 43.50 0.30 0.33 43.17 91.63


10+620.00 20.00 4.18 0.00 48.80 0.30 0.33 48.47 123.07

10+640.00 20.00 3.90 0.00 74.60 0.00 0.00 74.60 130.00

10+660.00 20.00 2.10 0.00 55.40 0.00 0.00 55.40 97.00

10+680.00 20.00 2.41 0.00 41.60 0.00 0.00 41.60 97.30

10+700.00 20.00 3.63 0.00 55.70 0.00 0.00 55.70 101.36


10+720.00 20.00 2.67 0.84 58.10 11.20 12.44 45.66 102.91

10+740.00 20.00 4.89 0.00 69.70 11.20 12.44 57.26 126.04

EXPLANACIONES (3) 172 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES,
PROYECTO CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN

DIFERENCIA DE ORDENADA
PROG. DIST. RELLENO
RELLENO VOLUMENES DE MASAS
CORTE (M2) CORTE (M3) RELLENO I.C=0.90 (M3)
(M2)
VRA=VR/IC

10+760.00 20.00 3.01 0.28 72.90 3.70 4.11 68.79 131.97

10+780.00 20.00 4.72 0.28 71.40 7.40 8.22 63.18 185.37


10+800.00 20.00 8.96 0.00 126.30 3.70 4.11 122.19 357.99

10+820.00 20.00 16.59 0.00 235.80 0.00 0.00 235.80 506.40

10+840.00 20.00 12.73 0.00 270.60 0.00 0.00 270.60 456.70

10+860.00 20.00 7.43 0.00 186.10 0.00 0.00 186.10 346.10

10+880.00 20.00 9.90 0.00 160.00 0.00 0.00 160.00 376.20


10+900.00 20.00 13.52 0.00 216.20 0.00 0.00 216.20 426.10

10+920.00 20.00 9.22 0.00 209.90 0.00 0.00 209.90 333.70

10+940.00 20.00 4.19 0.00 123.80 0.00 0.00 123.80 181.74

10+960.00 20.00 2.15 0.04 58.50 0.50 0.56 57.94 62.99

10+980.00 20.00 0.30 1.15 22.60 15.80 17.56 5.04 -47.27


11+000.00 20.00 0.00 2.57 2.80 49.60 55.11 -52.31 -99.41

11+020.00 20.00 0.21 0.73 1.90 44.10 49.00 -47.10 -24.89

11+040.00 20.00 3.38 0.00 33.10 9.80 10.89 22.21 102.31

11+060.00 20.00 5.30 0.00 80.10 0.00 0.00 80.10 162.60

11+080.00 20.00 3.64 0.00 82.50 0.00 0.00 82.50 154.80


11+100.00 20.00 4.19 0.00 72.30 0.00 0.00 72.30 123.19

11+120.00 20.00 1.33 0.01 51.00 0.10 0.11 50.89 47.08

EXPLANACIONES (3) 173 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES,
PROYECTO CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN

DIFERENCIA DE ORDENADA
PROG. DIST. RELLENO
RELLENO VOLUMENES DE MASAS
CORTE (M2) CORTE (M3) RELLENO I.C=0.90 (M3)
(M2)
VRA=VR/IC

11+140.00 20.00 0.00 1.08 12.30 14.50 16.11 -3.81 -34.48

11+160.00 20.00 0.00 0.99 0.00 27.60 30.67 -30.67 59.37


11+180.00 20.00 11.34 0.00 104.70 13.20 14.67 90.03 332.93

11+200.00 20.00 14.97 0.00 242.90 0.00 0.00 242.90 619.20

11+220.00 20.00 25.79 0.00 376.30 0.00 0.00 376.30 841.50

11+240.00 20.00 24.60 0.00 465.20 0.00 0.00 465.20 372.86

11+260.00 20.00 0.00 21.55 227.10 287.50 319.44 -92.34 -286.89


11+280.00 20.00 13.53 0.00 124.90 287.50 319.44 -194.54 -31.01

11+300.00 20.00 4.47 0.18 166.20 2.40 2.67 163.53 189.39

11+320.00 20.00 0.00 0.86 41.30 13.90 15.44 25.86 1.16

11+340.00 20.00 0.25 0.96 2.30 24.30 27.00 -24.70 -39.24

11+360.00 20.00 0.82 0.69 9.90 22.00 24.44 -14.54 27.93


11+380.00 20.00 4.89 0.00 52.70 9.20 10.22 42.48 198.58

11+400.00 20.00 12.02 0.00 156.10 0.00 0.00 156.10 401.40

11+420.00 20.00 14.55 0.00 245.30 0.00 0.00 245.30 550.70

11+440.00 20.00 18.54 0.00 305.40 0.00 0.00 305.40 671.20

11+460.00 20.00 21.09 0.00 365.80 0.00 0.00 365.80 707.40


11+480.00 20.00 15.91 0.00 341.60 0.00 0.00 341.60 539.48

11+500.00 20.00 5.65 0.08 199.10 1.10 1.22 197.88 275.54

EXPLANACIONES (3) 174 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES,
PROYECTO CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN

DIFERENCIA DE ORDENADA
PROG. DIST. RELLENO
RELLENO VOLUMENES DE MASAS
CORTE (M2) CORTE (M3) RELLENO I.C=0.90 (M3)
(M2)
VRA=VR/IC

11+520.00 20.00 3.01 0.07 80.00 2.10 2.33 77.67 138.36

11+540.00 20.00 3.68 0.00 61.80 1.00 1.11 60.69 118.09


11+560.00 20.00 2.54 0.00 57.40 0.00 0.00 57.40 134.20

11+580.00 20.00 5.78 0.00 76.80 0.00 0.00 76.80 172.80

11+600.00 20.00 4.61 0.00 96.00 0.00 0.00 96.00 170.60

11+620.00 20.00 3.47 0.00 74.60 0.00 0.00 74.60 130.00

11+640.00 20.00 2.54 0.00 55.40 0.00 0.00 55.40 109.90


11+660.00 20.00 3.37 0.00 54.50 0.00 0.00 54.50 108.60

11+680.00 20.00 2.49 0.00 54.10 0.00 0.00 54.10 94.00

11+700.00 20.00 1.83 0.00 39.90 0.00 0.00 39.90 71.00

11+720.00 20.00 1.54 0.00 31.10 0.00 0.00 31.10 57.90

11+740.00 20.00 1.37 0.00 26.80 0.00 0.00 26.80 40.76


11+760.00 20.00 1.93 1.11 30.40 14.80 16.44 13.96 21.90

11+780.00 20.00 2.68 1.22 42.50 31.10 34.56 7.94 50.63

11+800.00 20.00 3.91 0.00 60.80 16.30 18.11 42.69 113.73

11+820.00 20.00 3.85 0.04 71.60 0.50 0.56 71.04 144.99

11+840.00 20.00 4.23 0.00 74.50 0.50 0.56 73.94 147.14


11+860.00 20.00 3.71 0.00 73.20 0.00 0.00 73.20 133.84

11+880.00 20.00 2.93 0.04 61.20 0.50 0.56 60.64 113.29

EXPLANACIONES (3) 175 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES,
PROYECTO CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN

DIFERENCIA DE ORDENADA
PROG. DIST. RELLENO
RELLENO VOLUMENES DE MASAS
CORTE (M2) CORTE (M3) RELLENO I.C=0.90 (M3)
(M2)
VRA=VR/IC

11+900.00 20.00 2.84 0.00 53.20 0.50 0.56 52.64 101.24

11+920.00 20.00 2.43 0.00 48.60 0.00 0.00 48.60 96.10


11+940.00 20.00 2.72 0.00 47.50 0.00 0.00 47.50 93.90

11+960.00 20.00 2.31 0.00 46.40 0.00 0.00 46.40 83.86

11+980.00 20.00 2.77 0.64 46.90 8.50 9.44 37.46 68.50

12+000.00 20.00 2.06 0.28 44.60 12.20 13.56 31.04 62.13

12+020.00 20.00 1.76 0.00 35.20 3.70 4.11 31.09 72.79


12+040.00 20.00 2.76 0.00 41.70 0.00 0.00 41.70 87.40

12+060.00 20.00 2.19 0.00 45.70 0.00 0.00 45.70 89.90

12+080.00 20.00 2.60 0.00 44.20 0.00 0.00 44.20 89.29

12+100.00 20.00 2.40 0.07 46.20 1.00 1.11 45.09 80.97

12+120.00 20.00 1.61 0.01 37.10 1.10 1.22 35.88 69.26


12+140.00 20.00 2.13 0.07 34.60 1.10 1.22 33.38 71.66

12+160.00 20.00 2.25 0.07 40.50 2.00 2.22 38.28 70.51

12+180.00 20.00 1.53 0.10 34.90 2.40 2.67 32.23 52.47

12+200.00 20.00 1.39 0.34 26.90 6.00 6.67 20.23 47.92

12+220.00 20.00 2.17 0.00 32.80 4.60 5.11 27.69 64.27


12+240.00 20.00 1.93 0.08 37.80 1.10 1.22 36.58 88.96

12+260.00 20.00 3.88 0.00 53.60 1.10 1.22 52.38 104.31

EXPLANACIONES (3) 176 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES,
PROYECTO CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN

DIFERENCIA DE ORDENADA
PROG. DIST. RELLENO
RELLENO VOLUMENES DE MASAS
CORTE (M2) CORTE (M3) RELLENO I.C=0.90 (M3)
(M2)
VRA=VR/IC

12+280.00 20.00 2.04 0.18 54.60 2.40 2.67 51.93 81.80

12+300.00 20.00 1.99 0.31 37.20 6.60 7.33 29.87 63.04


12+320.00 20.00 2.17 0.04 38.40 4.70 5.22 33.18 74.48

12+340.00 20.00 2.63 0.17 44.30 2.70 3.00 41.30 74.59

12+360.00 20.00 1.85 0.38 41.40 7.30 8.11 33.29 58.31

12+380.00 20.00 1.48 0.01 30.80 5.20 5.78 25.02 49.14

12+400.00 20.00 1.43 0.18 26.90 2.50 2.78 24.12 66.16


12+420.00 20.00 3.41 0.00 44.70 2.40 2.67 42.03 134.83

12+440.00 20.00 6.64 0.00 92.80 0.00 0.00 92.80 177.50

12+460.00 20.00 2.54 0.00 84.70 0.00 0.00 84.70 132.10

12+480.00 20.00 2.60 0.00 47.40 0.00 0.00 47.40 97.84

12+500.00 20.00 2.92 0.04 51.00 0.50 0.56 50.44 93.71


12+520.00 20.00 2.45 0.39 49.60 5.70 6.33 43.27 75.86

12+540.00 20.00 1.74 0.02 38.70 5.50 6.11 32.59 62.04

12+560.00 20.00 1.60 0.07 30.90 1.30 1.44 29.46 80.44

12+580.00 20.00 4.04 0.00 52.10 1.00 1.11 50.99 187.89

12+600.00 20.00 10.79 0.00 136.90 0.00 0.00 136.90 271.50


12+620.00 20.00 3.79 0.00 134.60 0.00 0.00 134.60 199.60

12+640.00 20.00 3.25 0.00 65.00 0.00 0.00 65.00 138.40

EXPLANACIONES (3) 177 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES,
PROYECTO CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN

DIFERENCIA DE ORDENADA
PROG. DIST. RELLENO
RELLENO VOLUMENES DE MASAS
CORTE (M2) CORTE (M3) RELLENO I.C=0.90 (M3)
(M2)
VRA=VR/IC

12+660.00 20.00 4.70 0.00 73.40 0.00 0.00 73.40 185.30

12+680.00 20.00 7.42 0.00 111.90 0.00 0.00 111.90 234.80


12+700.00 20.00 5.89 0.00 122.90 0.00 0.00 122.90 209.60

12+720.00 20.00 3.50 0.00 86.70 0.00 0.00 86.70 167.40

12+740.00 20.00 5.24 0.00 80.70 0.00 0.00 80.70 158.90

12+760.00 20.00 3.23 0.00 78.20 0.00 0.00 78.20 137.40

12+780.00 20.00 3.19 0.00 59.20 0.00 0.00 59.20 118.10


12+800.00 20.00 3.20 0.00 58.90 0.00 0.00 58.90 140.50

12+820.00 20.00 5.64 0.00 81.60 0.00 0.00 81.60 240.80

12+840.00 20.00 11.60 0.00 159.20 0.00 0.00 159.20 341.90

12+860.00 20.00 8.19 0.00 182.70 0.00 0.00 182.70 323.90

12+880.00 20.00 7.11 0.00 141.20 0.00 0.00 141.20 344.70


12+900.00 20.00 14.94 0.00 203.50 0.00 0.00 203.50 417.00

12+920.00 20.00 8.19 0.00 213.50 0.00 0.00 213.50 349.00

12+940.00 20.00 6.49 0.00 135.50 0.00 0.00 135.50 284.70

12+960.00 20.00 9.67 0.00 149.20 0.00 0.00 149.20 329.40

12+980.00 20.00 9.85 0.00 180.20 0.00 0.00 180.20 338.86


13+000.00 20.00 7.39 0.03 159.10 0.40 0.44 158.66 267.81

13+020.00 20.00 4.49 0.00 109.60 0.40 0.44 109.16 200.46

EXPLANACIONES (3) 178 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES,
PROYECTO CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN

DIFERENCIA DE ORDENADA
PROG. DIST. RELLENO
RELLENO VOLUMENES DE MASAS
CORTE (M2) CORTE (M3) RELLENO I.C=0.90 (M3)
(M2)
VRA=VR/IC

13+040.00 20.00 5.41 0.00 91.30 0.00 0.00 91.30 212.10

13+060.00 20.00 7.68 0.00 120.80 0.00 0.00 120.80 264.90


13+080.00 20.00 7.93 0.00 144.10 0.00 0.00 144.10 293.60

13+100.00 20.00 8.26 0.00 149.50 0.00 0.00 149.50 370.70

13+120.00 20.00 15.70 0.00 221.20 0.00 0.00 221.20 460.40

13+140.00 20.00 10.22 0.00 239.20 0.00 0.00 239.20 357.20

13+160.00 20.00 2.57 0.00 118.00 0.00 0.00 118.00 76.70


13+180.00 20.00 0.00 4.39 23.70 58.50 65.00 -41.30 -192.86

13+200.00 20.00 0.00 5.84 0.00 136.40 151.56 -151.56 -281.56

13+220.00 20.00 0.00 2.93 0.00 117.00 130.00 -130.00 -183.22

13+240.00 20.00 0.00 0.66 0.00 47.90 53.22 -53.22 -50.64

13+260.00 20.00 1.39 0.03 12.80 9.20 10.22 2.58 51.43


13+280.00 20.00 3.95 0.00 49.30 0.40 0.44 48.86 156.26

13+300.00 20.00 7.68 0.00 107.40 0.00 0.00 107.40 273.40

13+320.00 20.00 10.30 0.00 166.00 0.00 0.00 166.00 333.00

13+340.00 20.00 7.79 0.00 167.00 0.00 0.00 167.00 304.30

13+360.00 20.00 7.08 0.00 137.30 0.00 0.00 137.30 249.20


13+380.00 20.00 5.04 0.00 111.90 0.00 0.00 111.90 209.10

13+400.00 20.00 5.49 0.00 97.20 0.00 0.00 97.20 202.00

EXPLANACIONES (3) 179 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES,
PROYECTO CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN

DIFERENCIA DE ORDENADA
PROG. DIST. RELLENO
RELLENO VOLUMENES DE MASAS
CORTE (M2) CORTE (M3) RELLENO I.C=0.90 (M3)
(M2)
VRA=VR/IC

13+420.00 20.00 5.86 0.00 104.80 0.00 0.00 104.80 191.69

13+440.00 20.00 3.56 0.01 87.00 0.10 0.11 86.89 145.79


13+460.00 20.00 3.03 0.13 60.90 1.80 2.00 58.90 96.92

13+480.00 20.00 1.49 0.13 41.80 3.40 3.78 38.02 66.53

13+500.00 20.00 1.80 0.00 30.40 1.70 1.89 28.51 71.61

13+520.00 20.00 2.87 0.00 43.10 0.00 0.00 43.10 124.30

13+540.00 20.00 5.93 0.00 81.20 0.00 0.00 81.20 168.30


13+560.00 20.00 3.51 0.00 87.10 0.00 0.00 87.10 160.09

13+580.00 20.00 4.52 0.07 74.10 1.00 1.11 72.99 157.18

13+600.00 20.00 4.72 0.00 85.30 1.00 1.11 84.19 168.89

13+620.00 20.00 4.45 0.00 84.70 0.00 0.00 84.70 169.70

13+640.00 20.00 4.76 0.00 85.00 0.00 0.00 85.00 176.40


13+660.00 20.00 5.15 0.00 91.40 0.00 0.00 91.40 193.00

13+680.00 20.00 5.86 0.00 101.60 0.00 0.00 101.60 214.60

13+700.00 20.00 6.38 0.00 113.00 0.00 0.00 113.00 240.40

13+720.00 20.00 7.42 0.00 127.40 0.00 0.00 127.40 257.30

13+740.00 20.00 6.65 0.00 129.90 0.00 0.00 129.90 252.60


13+760.00 20.00 6.64 0.00 122.70 0.00 0.00 122.70 238.30

13+780.00 20.00 5.88 0.00 115.60 0.00 0.00 115.60 258.00

EXPLANACIONES (3) 180 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES,
PROYECTO CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN

DIFERENCIA DE ORDENADA
PROG. DIST. RELLENO
RELLENO VOLUMENES DE MASAS
CORTE (M2) CORTE (M3) RELLENO I.C=0.90 (M3)
(M2)
VRA=VR/IC

13+800.00 20.00 9.54 0.00 142.40 0.00 0.00 142.40 308.80

13+820.00 20.00 8.48 0.00 166.40 0.00 0.00 166.40 316.20


13+840.00 20.00 7.75 0.00 149.80 0.00 0.00 149.80 270.50

13+860.00 20.00 5.33 0.00 120.70 0.00 0.00 120.70 215.80

13+880.00 20.00 4.97 0.00 95.10 0.00 0.00 95.10 171.40

13+900.00 20.00 3.29 0.00 76.30 0.00 0.00 76.30 136.40

13+920.00 20.00 3.22 0.00 60.10 0.00 0.00 60.10 115.80


13+940.00 20.00 2.82 0.00 55.70 0.00 0.00 55.70 142.10

13+960.00 20.00 6.54 0.00 86.40 0.00 0.00 86.40 182.30

13+980.00 20.00 3.85 0.00 95.90 0.00 0.00 95.90 132.32

14+000.00 20.00 2.24 1.33 56.20 17.80 19.78 36.42 58.34

14+020.00 20.00 2.27 0.00 41.70 17.80 19.78 21.92 67.12


14+040.00 20.00 2.62 0.00 45.20 0.00 0.00 45.20 95.50

14+060.00 20.00 2.83 0.00 50.30 0.00 0.00 50.30 114.60

14+080.00 20.00 4.14 0.00 64.30 0.00 0.00 64.30 164.00

14+100.00 20.00 6.66 0.00 99.70 0.00 0.00 99.70 329.90

14+120.00 20.00 18.27 0.00 230.20 0.00 0.00 230.20 459.10


14+140.00 20.00 6.52 0.00 228.90 0.00 0.00 228.90 370.40

14+160.00 20.00 8.81 0.00 141.50 0.00 0.00 141.50 282.80

EXPLANACIONES (3) 181 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES,
PROYECTO CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN

DIFERENCIA DE ORDENADA
PROG. DIST. RELLENO
RELLENO VOLUMENES DE MASAS
CORTE (M2) CORTE (M3) RELLENO I.C=0.90 (M3)
(M2)
VRA=VR/IC

14+180.00 20.00 6.50 0.00 141.30 0.00 0.00 141.30 262.30

14+200.00 20.00 6.61 0.00 121.00 0.00 0.00 121.00 256.20


14+220.00 20.00 8.04 0.00 135.20 0.00 0.00 135.20 277.10

14+240.00 20.00 7.33 0.00 141.90 0.00 0.00 141.90 255.10

14+260.00 20.00 4.93 0.00 113.20 0.00 0.00 113.20 232.50

14+280.00 20.00 7.99 0.00 119.30 0.00 0.00 119.30 228.17

14+300.00 20.00 5.46 1.04 124.20 13.80 15.33 108.87 157.11


14+320.00 20.00 4.59 1.97 92.80 40.10 44.56 48.24 121.52

14+340.00 20.00 6.51 0.00 102.50 26.30 29.22 73.28 137.56

14+360.00 20.00 1.78 0.82 76.50 11.00 12.22 64.28 77.09

14+380.00 20.00 1.77 0.52 32.70 17.90 19.89 12.81 25.90

14+400.00 20.00 0.75 0.17 23.20 9.10 10.11 13.09 -15.74


14+420.00 20.00 0.72 2.69 13.50 38.10 42.33 -28.83 -31.99

14+440.00 20.00 5.72 1.53 59.40 56.30 62.56 -3.16 69.64

14+460.00 20.00 4.66 0.02 95.80 20.70 23.00 72.80 212.87

14+480.00 20.00 10.55 0.00 140.40 0.30 0.33 140.07 219.82

14+500.00 20.00 0.20 1.31 99.20 17.50 19.44 79.76 31.56


14+520.00 20.00 0.00 2.06 1.80 45.00 50.00 -48.20 -55.46

14+540.00 20.00 2.52 0.00 23.30 27.50 30.56 -7.26 186.44

EXPLANACIONES (3) 182 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES,
PROYECTO CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN

DIFERENCIA DE ORDENADA
PROG. DIST. RELLENO
RELLENO VOLUMENES DE MASAS
CORTE (M2) CORTE (M3) RELLENO I.C=0.90 (M3)
(M2)
VRA=VR/IC

14+560.00 20.00 18.46 0.00 193.70 0.00 0.00 193.70 459.40

14+580.00 20.00 10.32 0.00 265.70 0.00 0.00 265.70 426.90


14+600.00 20.00 7.14 0.00 161.20 0.00 0.00 161.20 324.40

14+620.00 20.00 10.54 0.00 163.20 0.00 0.00 163.20 360.50

14+640.00 20.00 10.83 0.00 197.30 0.00 0.00 197.30 401.70

14+660.00 20.00 11.31 0.00 204.40 0.00 0.00 204.40 351.40

14+680.00 20.00 4.61 0.00 147.00 0.00 0.00 147.00 214.00


14+700.00 20.00 2.64 0.00 67.00 0.00 0.00 67.00 132.60

14+720.00 20.00 4.46 0.00 65.60 0.00 0.00 65.60 138.10

14+740.00 20.00 3.39 0.00 72.50 0.00 0.00 72.50 102.84

14+760.00 20.00 1.37 0.92 43.90 12.20 13.56 30.34 100.39

14+780.00 20.00 7.69 0.00 83.60 12.20 13.56 70.04 216.54


14+800.00 20.00 8.18 0.00 146.50 0.00 0.00 146.50 322.40

14+820.00 20.00 10.88 0.00 175.90 0.00 0.00 175.90 373.70

14+840.00 20.00 10.55 0.00 197.80 0.00 0.00 197.80 407.50

14+860.00 20.00 12.17 0.00 209.70 0.00 0.00 209.70 434.30

14+880.00 20.00 12.16 0.00 224.60 0.00 0.00 224.60 532.70


14+900.00 20.00 21.21 0.00 308.10 0.00 0.00 308.10 700.60

14+920.00 20.00 21.31 0.00 392.50 0.00 0.00 392.50 728.60

EXPLANACIONES (3) 183 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES,
PROYECTO CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
AREAS VOLUMEN

DIFERENCIA DE ORDENADA
PROG. DIST. RELLENO
RELLENO VOLUMENES DE MASAS
CORTE (M2) CORTE (M3) RELLENO I.C=0.90 (M3)
(M2)
VRA=VR/IC

14+940.00 20.00 15.10 0.00 336.10 0.00 0.00 336.10 532.30

14+960.00 20.00 6.15 0.00 196.20 0.00 0.00 196.20 213.41


14+980.00 20.00 0.25 2.82 59.10 37.70 41.89 17.21 -77.82

15+000.00 20.00 0.00 3.74 2.30 87.60 97.33 -95.03 -139.63

15+020.00 20.00 1.56 0.24 14.40 53.10 59.00 -44.60 -8.06

15+040.00 20.00 2.78 0.00 40.10 3.20 3.56 36.54 89462.21


SUB T O T A L 95,971.45 5,890.80 6,545.33 89,425.67 268,277.00

EXPLANACIONES (3) 184 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

0+000.00 - 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+020.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+040.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+060.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+080.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+100.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+120.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+140.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+160.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+180.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+200.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+220.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+240.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+260.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+280.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+300.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+320.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+340.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+360.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+380.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+400.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+420.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+440.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+460.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+480.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+500.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+520.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+540.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+560.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+580.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+600.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 185 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

0+620.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+640.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+660.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+680.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+700.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+720.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+740.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+760.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+780.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+800.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+820.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+840.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+860.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+880.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+900.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+920.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+940.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


0+960.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

0+980.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+000.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+020.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+040.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+060.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+080.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+100.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+120.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+140.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+160.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+180.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+200.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+220.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 186 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

1+240.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+260.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+280.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+300.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+320.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+340.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+360.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+380.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+400.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+420.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+440.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+460.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+480.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+500.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+520.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+540.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+560.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+580.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+600.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+620.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+640.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+660.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+680.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+700.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+720.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+740.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+760.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+780.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+800.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+820.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+840.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 187 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

1+860.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+880.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+900.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+920.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+940.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

1+960.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


1+980.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+000.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+020.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+040.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+060.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+080.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+100.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+120.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+140.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+160.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+180.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+200.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+220.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+240.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+260.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+280.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+300.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+320.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+340.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+360.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+380.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+400.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+420.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+440.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+460.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 188 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

2+480.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+500.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+520.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+540.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+560.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+580.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+600.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+620.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+640.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+660.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+680.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+700.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+720.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+740.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+760.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+780.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+800.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+820.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+840.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+860.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+880.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+900.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+920.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+940.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


2+960.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

2+980.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

3+000.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


3+020.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

3+040.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


3+060.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

3+080.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

talud de corte 189 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

3+100.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


3+120.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

3+140.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

3+160.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


3+180.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

3+200.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


3+220.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

3+240.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


3+260.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+280.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+300.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+320.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+340.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


3+360.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+380.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


3+400.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+420.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


3+440.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+460.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+480.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


3+500.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+520.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


3+540.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+560.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


3+580.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+600.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+620.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


3+640.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+660.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


3+680.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+700.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 190 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

3+720.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


3+740.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+760.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+780.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


3+800.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+820.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


3+840.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+860.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


3+880.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+900.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+920.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+940.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

3+960.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


3+980.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

4+000.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


4+020.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

4+040.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


4+060.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

4+080.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

4+100.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


4+120.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

4+140.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


4+160.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

4+180.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


4+200.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

4+220.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

4+240.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


4+260.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

4+280.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


4+300.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

4+320.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

talud de corte 191 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

4+340.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


4+360.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

4+380.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

4+400.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


4+420.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

4+440.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


4+460.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

4+480.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


4+500.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

4+520.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

4+540.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

4+560.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

4+580.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


4+600.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

4+620.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


4+640.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

4+660.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


4+680.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

4+700.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

4+720.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


4+740.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

4+760.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


4+780.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

4+800.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


4+820.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

4+840.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

4+860.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


4+880.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

4+900.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


4+920.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

4+940.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

talud de corte 192 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

4+960.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


4+980.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+000.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+020.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


5+040.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+060.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


5+080.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+100.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


5+120.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+140.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+160.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+180.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+200.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


5+220.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+240.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


5+260.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+280.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


5+300.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+320.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+340.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


5+360.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+380.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


5+400.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+420.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


5+440.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

5+460.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

5+480.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


5+500.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

5+520.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


5+540.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

5+560.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 193 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

5+580.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


5+600.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

5+620.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

5+640.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


5+660.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

5+680.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


5+700.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

5+720.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


5+740.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

5+760.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

5+780.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

5+800.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

5+820.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


5+840.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+860.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


5+880.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+900.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


5+920.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+940.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

5+960.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


5+980.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

6+000.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


6+020.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

6+040.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


6+060.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

6+080.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

6+100.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


6+120.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

6+140.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


6+160.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

6+180.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

talud de corte 194 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

6+200.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


6+220.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

6+240.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

6+260.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


6+280.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+300.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


6+320.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+340.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


6+360.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+380.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+400.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+420.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+440.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


6+460.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+480.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


6+500.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+520.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


6+540.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+560.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+580.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


6+600.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+620.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


6+640.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+660.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


6+680.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+700.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+720.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


6+740.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+760.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


6+780.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+800.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 195 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

6+820.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


6+840.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+860.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+880.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


6+900.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+920.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


6+940.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

6+960.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


6+980.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+000.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+020.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+040.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+060.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+080.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+100.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+120.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+140.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+160.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+180.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+200.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+220.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+240.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+260.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+280.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+300.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+320.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+340.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+360.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+380.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+400.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+420.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 196 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

7+440.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+460.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+480.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+500.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+520.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+540.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+560.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+580.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+600.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+620.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+640.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+660.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+680.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+700.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+720.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+740.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+760.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+780.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+800.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+820.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+840.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+860.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+880.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+900.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+920.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+940.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

7+960.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


7+980.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+000.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+020.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+040.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 197 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

8+060.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+080.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+100.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+120.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+140.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+160.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+180.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+200.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+220.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+240.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+260.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+280.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+300.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+320.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+340.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+360.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+380.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+400.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+420.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+440.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+460.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+480.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+500.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+520.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+540.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+560.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+580.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+600.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+620.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+640.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+660.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 198 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

8+680.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+700.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+720.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+740.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+760.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+780.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+800.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+820.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+840.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+860.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+880.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+900.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+920.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+940.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

8+960.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


8+980.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+000.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


9+020.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+040.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+060.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


9+080.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+100.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


9+120.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+140.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


9+160.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+180.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+200.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


9+220.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+240.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


9+260.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+280.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 199 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

9+300.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


9+320.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+340.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+360.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


9+380.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+400.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


9+420.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

9+440.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


9+460.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

9+480.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

9+500.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

9+520.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

9+540.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


9+560.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

9+580.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


9+600.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

9+620.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


9+640.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

9+660.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

9+680.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


9+700.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

9+720.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


9+740.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+760.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


9+780.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+800.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+820.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


9+840.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+860.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


9+880.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+900.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 200 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

9+920.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


9+940.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+960.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

9+980.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+000.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+020.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+040.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+060.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+080.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+100.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+120.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+140.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+160.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+180.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+200.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+220.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+240.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+260.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+280.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+300.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+320.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+340.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+360.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+380.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+400.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+420.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+440.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+460.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+480.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+500.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+520.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 201 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

10+540.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+560.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+580.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+600.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+620.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+640.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+660.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+680.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+700.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+720.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+740.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+760.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+780.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+800.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+820.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+840.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+860.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+880.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+900.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+920.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+940.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

10+960.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


10+980.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+000.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+020.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+040.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+060.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+080.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+100.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+120.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+140.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 202 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

11+160.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+180.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+200.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+220.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+240.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+260.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+280.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+300.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+320.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+340.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+360.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+380.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+400.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+420.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+440.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+460.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+480.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+500.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+520.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+540.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+560.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+580.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+600.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+620.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+640.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+660.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+680.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+700.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+720.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+740.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+760.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 203 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

11+780.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+800.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+820.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+840.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+860.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+880.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+900.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

11+920.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


11+940.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

11+960.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

11+980.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+000.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+020.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


12+040.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+060.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


12+080.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+100.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


12+120.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+140.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+160.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


12+180.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+200.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


12+220.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+240.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


12+260.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+280.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+300.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


12+320.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+340.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


12+360.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+380.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

talud de corte 204 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

12+400.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


12+420.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+440.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+460.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


12+480.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+500.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


12+520.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+540.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


12+560.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+580.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+600.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+620.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+640.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


12+660.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+680.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


12+700.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+720.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


12+740.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+760.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

12+780.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


12+800.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

12+820.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


12+840.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

12+860.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


12+880.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

12+900.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

12+920.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


12+940.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

12+960.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


12+980.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+000.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 205 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

13+020.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+040.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+060.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+080.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+100.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+120.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+140.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+160.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+180.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+200.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+220.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+240.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+260.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+280.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+300.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+320.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+340.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+360.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+380.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+400.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+420.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+440.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+460.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+480.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+500.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+520.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+540.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+560.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+580.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+600.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+620.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 206 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

13+640.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+660.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+680.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+700.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+720.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+740.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+760.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+780.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+800.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+820.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+840.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+860.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+880.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+900.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+920.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+940.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

13+960.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


13+980.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

14+000.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

14+020.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


14+040.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

14+060.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


14+080.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

14+100.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


14+120.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

14+140.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

14+160.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


14+180.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

14+200.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


14+220.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

14+240.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

talud de corte 207 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

14+260.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


14+280.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

14+300.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

14+320.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


14+340.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

14+360.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


14+380.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

14+400.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%


14+420.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

14+440.00 20.00 3:1 3:2 4.00 100.00% 0.00% 0.00%

14+460.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

14+480.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

14+500.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


14+520.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

14+540.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


14+560.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

14+580.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


14+600.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

14+620.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

14+640.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


14+660.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

14+680.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


14+700.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

14+720.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


14+740.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

14+760.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

14+780.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


14+800.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

14+820.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%


14+840.00 20.00 3:1 3:2 4.00 80.00% 20.00% 0.00%

14+860.00 20.00 3:1 3:2 4.00 100.00% 20.00% 0.00%

talud de corte 208 DE 209


METRADO DE EXPLANACIONES - PAVIMENTO
“REHABILITACION Y MEJORAMIENTO DE CAMINO VECINAL OCROS, CCERAOCRO, CHUMBES, CCACCAMARCA, PAJONAL, CALLEJON, DISTRITO DE
PROYECTO OCROS, PROVINCIA DE HUAMANGA - AYACUCHO”

OBRA

PARTIDA : METRADO DE EXPLANACIONES Y PAVIMENTO


TRAMO : EJE PRINCIPAL OCROS - CCERAOCROS
TRAMO I
TALUDES CLASIFICACION DE MATERIAL

PROG. DIST.
TALUD TALUD M. SUELTO R. SUELTA
ANCHO R. FIJA (%)
CORTE RELLENO (%) (%)

14+880.00 20.00 3:1 3:2 4.00 100.00% 20.00% 0.00%


14+900.00 20.00 3:1 3:2 4.00 100.00% 20.00% 0.00%

14+920.00 20.00 3:1 3:2 4.00 100.00% 20.00% 0.00%

14+940.00 20.00 3:1 3:2 4.00 100.00% 20.00% 0.00%


14+960.00 20.00 3:1 3:2 4.00 100.00% 20.00% 0.00%

14+980.00 20.00 3:1 3:2 4.00 100.00% 20.00% 0.00%


15+000.00 20.00 3:1 3:2 4.00 100.00% 20.00% 0.00%

15+020.00 20.00 3:1 3:2 4.00 100.00% 20.00% 0.00%


15+040.00 20.00 3:1 3:2 4.00 100.00% 20.00% 0.00%
SUB T O T A L

talud de corte 209 DE 209