CONSORCIO VIAL CHUPA

OBRA: TRAMO DE CARRETERA


Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos

DIVISION DE EQUIPOS

FECHA : DICIEMBRE

RESUMEN DE VALORIZACION EQUIPOS

VALORIZACION AL MES DE DICIEMBRE _ CHUPA - DESVIO HUANCANE _ 2019


DESCUENTOS S/.
PROPIETARIO EQUIPOS US$ TOTAL S/.
MATERIALES MANO DE OBRA OTROS

CONSTRUCTORA SURUPANA SAC. 618,325.46 618,325.46


RUC:20447647096

SUB TOTAL S/. 618,325.46 0.00 0.00 0.00 618,325.46

IGV 18% 111,298.58


TOTAL S/. 729,624.05
CONSTRUCTORA SURUPANA S.A.C.
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos

DIVISION DE EQUIPOS

VALORIZACION DE EQUIPOS SURUPANA AL MES DE DICIEMBRE DEL 2019

PRESENTE VALORIZACION
PRECIO VALORIZACION.
ITEM CODIGO DESCRIPCION MARCA MODELO UNID
UNITARIO S/ TOTAL
HORAS VAL. MENSUAL S/

1 0160-001 MOTONIVELADORA CATERPILLAR CATERPILLAR HORA 148.76 244.42 36,359.92 42,904.70


2 0160-002 MOTONIVELADORA CATERPILLAR CATERPILLAR HORA 148.76 240.02 35,705.38 42,132.34
3 0330-004 EXCAVADORA HIDRAULICA CATERPILLAR CATERPILLAR HORA 207.35 242.15 50,209.80 59,247.57
4 0420-001 RETROEXCAVADORA CATERPILLAR CATERPILLAR HORA 83.33 208.92 17,409.30 20,542.98
5 0501-004 RODILLO LISO VIBRATORIO CATERPILLAR CATERPILLAR HORA 92.31 243.05 22,435.95 26,474.42
6 0501-005 RODILLO LISO VIBRATORIO CATERPILLAR CATERPILLAR HORA 92.31 238.95 22,057.47 26,027.82
7 0502-001 RODILLO NEUMATICO HAMM HAMM HORA 108.57 222.75 24,183.97 28,537.08
8 0504-001 RODILLO TANDEM DYNAPAC DYNAPAC HORA 100.59 236.25 23,764.39 28,041.98
9 0504-002 RODILLO TANDEM HAMM HAMM HORA 100.59 239.15 24,056.10 28,386.20
10 0962-002 Cargador Frontal CATERPILLAR CATERPILLAR HORA 130.95 240.75 31,526.21 37,200.93
11 1170-014 CAMION VOLQUETE 15 M3 VOLVO VOLVO HORA 93.18 240.25 22,386.50 26,416.06
12 1170-015 CAMION VOLQUETE 15 M3 VOLVO VOLVO HORA 93.18 274.14 25,544.37 30,142.35
13 1170-016 CAMION VOLQUETE 15 M3 VOLVO VOLVO HORA 93.18 248.98 23,199.96 27,375.95
14 1170-017 CAMION VOLQUETE 15 M3 VOLVO VOLVO HORA 93.18 245.78 22,901.78 27,024.10
15 1170-018 CAMION VOLQUETE 15 M3 VOLVO VOLVO HORA 93.18 247.33 23,046.21 27,194.53
16 1170-019 CAMION VOLQUETE 15 M3 VOLVO VOLVO HORA 93.18 268.64 25,031.88 29,537.61
17 1170-020 CAMION VOLQUETE 15 M3 VOLVO VOLVO HORA 93.18 248.17 23,124.48 27,286.89
18 1170-021 CAMION VOLQUETE 15 M3 VOLVO VOLVO HORA 93.18 251.55 23,439.43 27,658.53
19 1170-022 CAMION VOLQUETE 15 M3 VOLVO VOLVO HORA 93.18 249.96 23,291.27 27,483.70
20 1170-023 CAMION VOLQUETE 15 M3 VOLVO VOLVO HORA 93.18 283.58 26,423.98 31,180.30
21 1820-001 CAMION ORMIGUERO / MIXER IVECO HORA 96.42 244.45 23,569.87 27,812.45
22 1820-003 CAMION ORMIGUERO / MIXER VOLVO VOLVO HORA 96.42 245.45 23,666.29 27,926.22
23 1860-001 Cisterna de Combustible Z6E-838 MITSUBISHI DIARIO 150.00 250.00 37,500.00 44,250.00
24 7230-002 Camioneta Nissan DIARIO 50.00 26.00 1,300.00 1,534.00
25 7230-008 Camioneta Toyota Doble Cabina 4x4 TOYOTA DIARIO 75.13 26.00 1,953.38 2,304.99
26 8110-002 Comprensora de Aire HORA 35.70 118.70 4,237.59 5,000.36

5,825.39 618,325.46 729,624.05


TOTAL 729,624.05
º CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO

Area: Division de Equipos

DIVISIÓN DE EQUIPOS
Resumen de Hrs trabajadas, Eficiencia Operativa, Disponibilidad Mecanica y % Utilizacion - Equipos Surupana
Mes de Diciembre - 2019

Hrs
Horas
Horometro Eficiencia. Falta de Disp. Utilización Trabajadas/ EFICIENCIA
ITEM U.A. Descripción Marca MODELO Trabajadas mantto.
Mes Operativa (%) servicio mecánica (%) Hrs PRODUCTIVA %
Producción
Horometro
1 0160-001 Motoniveladora Caterpillar 160K 253.00 244.42 100.00 0.00 0.00 100.00 100.00 96.61 100.00
2 0160-002 Motoniveladora Caterpillar 160H 248.60 240.02 100.00 0.00 0.00 100.00 100.00 96.55 100.00
3 0330-004 Excavadora hidraulica Caterpillar 330D2L 250.40 242.15 100.00 0.00 0.00 100.00 100.00 96.71 100.00
4 0420-001 Retroexcavadora Caterpillar 420E 217.50 208.92 100.00 0.00 0.00 100.00 100.00 96.06 100.00
5 0501-004 Rodillo Liso Caterpillar CS56 251.30 243.05 100.00 0.00 0.00 100.00 100.00 96.72 100.00
6 0501-005 Rodillo Liso Caterpillar CS56 247.20 238.95 100.00 0.00 0.00 100.00 100.00 96.66 100.00
7 0502-001 Rodillo Neumatico Hamm Hamm CC501 231.00 222.75 100.00 0.00 0.00 100.00 100.00 96.43 100.00
8 0504-001 Rodillo Liso Doble Rola/TANDEM Tamden CC501 244.50 236.25 100.00 0.00 0.00 100.00 100.00 96.63 100.00
9 0504-002 Rodillo Liso Doble Rolla HAMM 247.40 239.15 100.00 0.00 0.00 100.00 100.00 96.67 100.00
10 0962-002 Cargador Frontal Volvo L150E 249.00 240.75 100.00 0.00 0.00 100.00 100.00 96.69 100.00
11 1170-014 Camion Volquete Volvo FM440 244.50 240.25 100.00 0.00 0.00 100.00 100.00 98.26 100.00
12 1170-015 Camion Volquete Volvo FM440 278.90 274.14 100.00 0.00 0.00 100.00 100.00 98.29 100.00
13 1170-016 Camion Volquete Volvo FMX440 253.40 248.98 100.00 0.00 0.00 100.00 100.00 98.26 100.00
14 1170-017 Camion Volquete Volvo FMX440 250.20 245.78 100.00 0.00 0.00 100.00 100.00 98.23 100.00
15 1170-018 Camion Volquete VOLVO FMX 6X4 R 256.00 247.33 100.00 0.00 0.00 100.00 100.00 96.61 100.00
16 1170-019 Camion Volquete VOLVO FMX 6X4 R 273.23 268.64 100.00 0.00 0.00 100.00 100.00 98.32 100.00
17 1170-020 Camion Volquete VOLVO FMX 6X4 R 252.42 248.17 100.00 0.00 0.00 100.00 100.00 98.32 100.00
18 1170-021 Camion Volquete VOLVO FMX 6X4 R 255.80 251.55 100.00 0.00 0.00 100.00 100.00 98.34 100.00
19 1170-022 Camion Volquete VOLVO FMX 6X4 R 254.21 249.96 100.00 0.00 0.00 100.00 100.00 98.33 100.00
20 1170-023 Camion Volquete VOLVO FMX 6X4 R 288.34 283.58 100.00 0.00 0.00 100.00 100.00 98.35 100.00
21 1820-001 CAMION ORMIGUERO/MIXER IVECO 248.70 244.45 100.00 0.00 0.00 100.00 100.00 98.29 100.00
22 1820-003 CAMION ORMIGUERO/MIXER Volvo 249.70 245.45 100.00 0.00 0.00 100.00 100.00 98.30 100.00
23 1860-001 Cisterna de Combustible MITSUBISHI CANTER 250.00 250.00 100.00 0.00 0.00 100.00 100.00 100.00 100.00
24 7230-002 Camioneta Nissan 26.00 26.00 100.00 0.00 0.00 100.00 100.00 100.00 100.00
25 7230-008 Camioneta Toyota 26.00 26.00 100.00 0.00 0.00 100.00 100.00 100.00 100.00
26 8110-002 Comprensora de Aire 118.70 118.70 100.00 0.00 0.00 100.00 100.00 100.00 100.00
TOTAL 5847.30 5706.69
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos

CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO MOTONIVELADORA 160K


U.A 0160-001 Operador: WILAR CONDORI SIRENA

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
12/1/2019 0.00 0.00 0.00 0.00 0.0 0.0
12/2/2019 10203.00 10213.00 10.00 0.33 9.67 10.0 10.0
12/3/2019 10213.00 10224.50 11.50 0.33 1.00 11.17 12.5 12.5
12/4/2019 10224.50 10235.00 10.50 0.33 1.00 10.17 11.5 11.5
12/5/2019 10235.00 10246.00 11.00 0.33 1.00 10.67 12.0 12.0
12/6/2019 10246.00 10255.80 9.80 0.33 1.00 9.47 10.8 10.8
12/7/2019 10255.80 10264.90 9.10 0.33 1.00 8.77 10.1 10.1
12/8/2019 10264.90 10264.90 0.00 0.00 0.0 0.0
12/9/2019 10264.90 10274.50 9.60 0.33 1.00 9.27 10.6 10.6
12/10/2019 10274.50 10285.10 10.60 0.33 1.00 10.27 11.6 11.6
12/11/2019 10285.10 10296.00 10.90 0.33 1.00 10.57 11.9 11.9
12/12/2019 10296.00 10305.80 9.80 0.33 9.47 9.8 9.8
12/13/2019 10305.80 10316.40 10.60 0.33 1.00 10.27 11.6 11.6
12/14/2019 10316.40 10325.80 9.40 0.33 1.00 9.07 10.4 10.4
12/15/2019 10325.80 10325.80 0.00 0.00 0.0 0.0
12/16/2019 10325.80 10336.00 10.20 0.33 9.87 10.2 10.2
12/17/2019 10336.00 10346.80 10.80 0.33 10.47 10.8 10.8
12/18/2019 10346.80 10356.70 9.90 0.33 1.00 9.57 10.9 10.9
12/19/2019 10356.70 10366.40 9.70 0.33 1.00 9.37 10.7 10.7
12/20/2019 10366.40 10376.90 10.50 0.33 1.00 10.17 11.5 11.5
12/21/2019 10376.90 10386.00 9.10 0.33 1.00 8.77 10.1 10.1
12/22/2019 10386.00 10386.00 0.00 1.00 0.00 1.0 1.0
12/23/2019 10386.00 10396.40 10.40 0.33 1.00 10.07 11.4 11.4
12/24/2019 10396.40 10406.00 9.60 0.33 1.00 9.27 10.6 10.6
12/25/2019 10406.00 10406.00 0.00 0.33 1.00 -0.33 1.0 1.0
12/26/2019 10416.00 10426.00 10.00 0.33 1.00 9.67 11.0 11.0
12/27/2019 10426.00 10435.00 9.00 0.33 1.00 8.67 10.0 10.0
12/28/2019 10435.00 10445.00 10.00 0.33 1.00 9.67 11.0 11.0
12/29/2019 10445.00 10445.00 0.00 0.00 0.0 0.0
12/30/2019 10445.00 10456.50 11.50 0.33 1.00 11.17 12.5 12.5
12/31/2019 10456.50 10466.00 9.50 0.33 1.00 9.17 10.5 10.5
0160-001 253.00 8.58 0.00 0.00 0.00 23.00 0.00 244.42 276.00 276.00
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos

CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO MOTONIVELADORA 160 H


U.A 0160-002 Operador: WILAR CONDORI SERENA

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/30/2019 9309.10 9315.40 6.30 0.33 1.00 5.97 7.3 7.3
12/1/2019 9315.40 9315.40 0.00 0.00 0.0 0.0
12/2/2019 9315.40 9323.20 7.80 0.33 1.00 7.47 8.8 8.8
12/3/2019 9323.20 9333.10 9.90 0.33 1.00 9.57 10.9 10.9
12/4/2019 9333.10 9341.10 8.00 0.33 1.00 7.67 9.0 9.0
12/5/2019 9341.10 9352.10 11.00 0.33 1.00 10.67 12.0 12.0
12/6/2019 9352.10 9362.30 10.20 0.33 1.00 9.87 11.2 11.2
12/7/2019 9362.30 9373.20 10.90 0.33 1.00 10.57 11.9 11.9
12/8/2019 9373.20 9373.20 0.00 0.00 0.0 0.0
12/9/2019 9373.20 9382.60 9.40 0.33 1.00 9.07 10.4 10.4
12/10/2019 9382.60 9393.50 10.90 0.33 1.00 10.57 11.9 11.9
12/11/2019 9393.50 9404.90 11.40 0.33 1.00 11.07 12.4 12.4
12/12/2019 9404.90 9413.80 8.90 0.33 1.00 8.57 9.9 9.9
12/13/2019 9413.80 9423.40 9.60 0.33 1.00 9.27 10.6 10.6
12/14/2019 9423.40 9433.00 9.60 0.33 1.00 9.27 10.6 10.6
12/15/2019 9433.00 9433.00 0.00 0.33 -0.33 0.0 0.0
12/16/2019 9433.00 9443.60 10.60 0.33 1.00 10.27 11.6 11.6
12/17/2019 9443.60 9453.20 9.60 0.33 1.00 9.27 10.6 10.6
12/18/2019 9453.20 9464.80 11.60 0.33 1.00 11.27 12.6 12.6
12/19/2019 9464.80 9474.50 9.70 0.33 1.00 9.37 10.7 10.7
12/20/2019 9474.50 9485.10 10.60 0.33 1.00 10.27 11.6 11.6
12/21/2019 9485.10 9494.40 9.30 0.33 1.00 8.97 10.3 10.3
12/22/2019 9494.40 9494.40 0.00 0.00 0.0 0.0
12/23/2019 9494.40 9504.70 10.30 0.33 1.00 9.97 11.3 11.3
12/24/2019 9504.70 9515.80 11.10 0.33 1.00 10.77 12.1 12.1
12/25/2019 9515.80 9515.80 0.00 0.00 0.0 0.0
12/26/2019 9515.80 9524.80 9.00 0.33 1.00 8.67 10.0 10.0
12/27/2019 9524.80 9535.10 10.30 0.33 1.00 9.97 11.3 11.3
12/28/2019 9535.10 9546.30 11.20 0.33 1.00 10.87 12.2 12.2
12/29/2019 9546.30 9546.30 0.00 0.00 0.0 0.0
12/30/2019 9546.30 9557.70 11.40 0.33 1.00 11.07 12.4 12.4
0160-002 248.60 8.58 0.00 0.00 0.00 25.00 0.00 240.02 273.60 273.60
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Excavadora Cat


U.A 0330-004 Operador: RUFO FLORES CCAMA

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs Gal/Dia
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/30/2019 2928.00 2938.80 10.80 0.33 1.00 10.47 11.8 11.8
12/1/2019 2938.80 2938.80 0.00 0.00 0.0 0.0
12/2/2019 2938.80 2949.50 10.70 0.33 1.00 10.37 11.7 11.7
12/3/2019 2949.50 2959.40 9.90 0.33 1.00 9.57 10.9 10.9
12/4/2019 2959.40 2968.90 9.50 0.33 1.00 9.17 10.5 10.5
12/5/2019 2968.90 2979.40 10.50 0.33 1.00 10.17 11.5 11.5
12/6/2019 2979.40 2989.40 10.00 0.33 1.00 9.67 11.0 11.0
12/7/2019 2989.40 2999.60 10.20 0.33 1.00 9.87 11.2 11.2
12/8/2019 2999.60 2999.60 0.00 0.00 0.0 0.0
12/9/2019 2999.60 3009.80 10.20 0.33 1.00 9.87 11.2 11.2
12/10/2019 3009.80 3019.80 10.00 0.33 1.00 9.67 11.0 11.0
12/11/2019 3019.80 3028.80 9.00 0.33 1.00 8.67 10.0 10.0
12/12/2019 3028.80 3038.70 9.90 0.33 1.00 9.57 10.9 10.9
12/13/2019 3038.70 3049.80 11.10 0.33 1.00 10.77 12.1 12.1
12/14/2019 3049.80 3060.20 10.40 0.33 1.00 10.07 11.4 11.4
12/15/2019 3060.20 3060.20 0.00 0.00 0.0 0.0
12/16/2019 3060.20 3071.00 10.80 0.33 1.00 10.47 11.8 11.8
12/17/2019 3071.00 3080.50 9.50 0.33 1.00 9.17 10.5 10.5
12/18/2019 3080.50 3090.30 9.80 0.33 1.00 9.47 10.8 10.8
12/19/2019 3090.30 3099.80 9.50 0.33 1.00 9.17 10.5 10.5
12/20/2019 3099.80 3108.00 8.20 0.33 1.00 7.87 9.2 9.2
12/21/2019 3108.00 3118.40 10.40 0.33 1.00 10.07 11.4 11.4
12/22/2019 3118.40 3118.40 0.00 0.00 0.0 0.0
12/23/2019 3118.40 3128.40 10.00 0.33 1.00 9.67 11.0 11.0
12/24/2019 3128.40 3137.60 9.20 0.33 1.00 8.87 10.2 10.2
12/25/2019 3137.60 3137.60 0.00 0.00 0.0 0.0
12/26/2019 3137.60 3147.00 9.40 0.33 1.00 9.07 10.4 10.4
12/27/2019 3147.00 3157.20 10.20 0.33 1.00 9.87 11.2 11.2
12/28/2019 3157.20 3168.30 11.10 0.33 1.00 10.77 12.1 12.1
12/29/2019 3168.30 3168.30 0.00 0.00 0.0 0.0
12/30/2019 3168.30 3178.40 10.10 0.33 1.00 9.77 11.1 11.1
0330-004 250.40 8.25 0.00 0.00 0.00 25.00 0.00 242.15 275.40 275.40 0
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Retroexcavadora
U.A 0420-001 Operador: YUNIOR ALARCON CARCAHUSTO

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/27/2019 6128.70 6135.70 7.00 0.33 1.00 6.67 8.0 8.0
11/28/2019 6135.70 6142.50 6.80 0.33 1.00 6.47 7.8 7.8
11/29/2019 6142.50 6150.00 7.50 0.33 1.00 7.17 8.5 8.5
11/30/2019 6150.00 6154.30 4.30 0.33 1.00 3.97 5.3 5.3
12/1/2019 6154.30 6154.30 0.00 0.00 0.0 0.0
12/2/2019 6154.30 6161.40 7.10 0.33 1.00 6.77 8.1 8.1
12/3/2019 6161.40 6168.70 7.30 0.33 1.00 6.97 8.3 8.3
12/4/2019 6168.70 6177.30 8.60 0.33 1.00 8.27 9.6 9.6
12/5/2019 6177.30 6185.00 7.70 0.33 1.00 7.37 8.7 8.7
12/6/2019 6185.00 6194.20 9.20 0.33 1.00 8.87 10.2 10.2
12/7/2019 6194.20 6198.00 3.80 0.33 1.00 3.47 4.8 4.8
12/8/2019 6198.00 6198.00 0.00 0.00 0.0 0.0
12/9/2019 6198.00 6205.60 7.60 0.33 1.00 7.27 8.6 8.6
12/10/2019 6205.60 6214.60 9.00 0.33 1.00 8.67 10.0 10.0
12/11/2019 6214.60 6223.20 8.60 0.33 1.00 8.27 9.6 9.6
12/12/2019 6223.20 6232.00 8.80 0.33 1.00 8.47 9.8 9.8
12/13/2019 6232.00 6243.20 11.20 0.33 1.00 10.87 12.2 12.2
12/14/2019 6243.20 6249.40 6.20 0.33 1.00 5.87 7.2 7.2
12/15/2019 6249.40 6249.40 0.00 0.00 0.0 0.0
12/16/2019 6249.40 6256.20 6.80 0.33 1.00 6.47 7.8 7.8
12/17/2019 6256.20 6262.40 6.20 0.33 1.00 5.87 7.2 7.2
12/18/2019 6262.40 6272.30 9.90 0.33 1.00 9.57 10.9 10.9
12/19/2019 6272.30 6282.40 10.10 0.33 1.00 9.77 11.1 11.1
12/20/2019 6282.40 6292.50 10.10 0.33 1.00 9.77 11.1 11.1
12/21/2019 6292.50 6303.40 10.90 0.33 1.00 10.57 11.9 11.9
12/22/2019 6303.40 6303.40 0.00 0.00 0.0 0.0
12/23/2019 6303.40 6314.20 10.80 0.33 1.00 10.47 11.8 11.8
12/24/2019 6314.20 6325.30 11.10 0.33 1.00 10.77 12.1 12.1
12/25/2019 6325.30 6325.30 0.00 0.0 0.0
12/26/2019 6325.30 6335.00 9.70 0.33 1.00 9.37 10.7 10.7
12/27/2019 6335.00 6346.20 11.20 0.33 1.00 10.87 12.2 12.2
0420-001 217.50 8.58 0.00 0.00 0.00 26.00 0.00 208.92 243.50 243.50
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Rodillo Liso


U.A 0501-004 Operador: Edwin Quispe Canahuire

Diferencia Arran.ini Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/30/2019 8512.30 8521.40 9.10 0.33 1.00 8.77 10.1 10.1
12/1/2019 8521.40 8521.40 0.00 0.00 0.0 0.0
12/2/2019 8521.40 8531.70 10.30 0.33 1.00 9.97 11.3 11.3
12/3/2019 8531.70 8541.80 10.10 0.33 1.00 9.77 11.1 11.1
12/4/2019 8541.80 8551.40 9.60 0.33 1.00 9.27 10.6 10.6
12/5/2019 8551.40 8561.60 10.20 0.33 1.00 9.87 11.2 11.2
12/6/2019 8561.60 8572.70 11.10 0.33 1.00 10.77 12.1 12.1
12/7/2019 8572.70 8581.60 8.90 0.33 1.00 8.57 9.9 9.9
12/8/2019 8581.60 8581.60 0.00 0.0 0.0
12/9/2019 8581.60 8591.70 10.10 0.33 1.00 9.77 11.1 11.1
12/10/2019 8591.70 8601.20 9.50 0.33 1.00 9.17 10.5 10.5
12/11/2019 8601.20 8612.70 11.50 0.33 1.00 11.17 12.5 12.5
12/12/2019 8612.70 8621.80 9.10 0.33 1.00 8.77 10.1 10.1
12/13/2019 8621.80 8631.40 9.60 0.33 1.00 9.27 10.6 10.6
12/14/2019 8631.40 8642.50 11.10 0.33 1.00 10.77 12.1 12.1
12/15/2019 8642.50 8642.50 0.00 0.0 0.0
12/16/2019 8642.50 8653.30 10.80 0.33 1.00 10.47 11.8 11.8
12/17/2019 8653.30 8662.60 9.30 0.33 1.00 8.97 10.3 10.3
12/18/2019 8662.60 8673.50 10.90 0.33 1.00 10.57 11.9 11.9
12/19/2019 8673.50 8682.60 9.10 0.33 1.00 8.77 10.1 10.1
12/20/2019 8682.60 8693.10 10.50 0.33 1.00 10.17 11.5 11.5
12/21/2019 8693.10 8702.80 9.70 0.33 1.00 9.37 10.7 10.7
12/22/2019 8702.80 8702.80 0.00 0.0 0.0
12/23/2019 8702.80 8713.20 10.40 0.33 1.00 10.07 11.4 11.4
12/24/2019 8713.20 8723.10 9.90 0.33 1.00 9.57 10.9 10.9
12/25/2019 8723.10 8723.10 0.00 0.0 0.0
12/26/2019 8723.10 8733.40 10.30 0.33 1.00 9.97 11.3 11.3
12/27/2019 8733.40 8742.90 9.50 0.33 1.00 9.17 10.5 10.5
12/28/2019 8742.90 8753.50 10.60 0.33 1.00 10.27 11.6 11.6
12/29/2019 8753.50 8753.50 0.00 0.0 0.0
12/30/2019 8753.50 8763.60 10.10 0.33 1.00 9.77 11.1 11.1
0501-004 251.30 8.25 0.00 0.00 0.00 25.00 0.00 243.05 276.30 276.30
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos

CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Rodillo Liso


U.A 0501-005 Operador: EDWIN QUISPE CANAHUIRE

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/30/2019 8776.50 8786.50 10.00 0.33 1.00 9.67 11.0 11.0
12/1/2019 8786.50 8786.50 0.00 0.00 0.0 0.0
12/2/2019 8786.50 8796.20 9.70 0.33 1.00 9.37 10.7 10.7
12/3/2019 8796.20 8804.90 8.70 0.33 1.00 8.37 9.7 9.7
12/4/2019 8804.90 8814.30 9.40 0.33 1.00 9.07 10.4 10.4
12/5/2019 8814.30 8823.80 9.50 0.33 1.00 9.17 10.5 10.5
12/6/2019 8823.80 8832.80 9.00 0.33 1.00 8.67 10.0 10.0
12/7/2019 8832.80 8843.60 10.80 0.33 1.00 10.47 11.8 11.8
12/8/2019 8843.60 8843.60 0.00 0.00 0.0 0.0
12/9/2019 8843.60 8853.90 10.30 0.33 1.00 9.97 11.3 11.3
12/10/2019 8853.90 8863.70 9.80 0.33 1.00 9.47 10.8 10.8
12/11/2019 8863.70 8872.80 9.10 0.33 1.00 8.77 10.1 10.1
12/12/2019 8872.80 8882.40 9.60 0.33 1.00 9.27 10.6 10.6
12/13/2019 8882.40 8892.50 10.10 0.33 1.00 9.77 11.1 11.1
12/14/2019 8892.50 8902.00 9.50 0.33 1.00 9.17 10.5 10.5
12/15/2019 8902.00 8902.00 0.00 0.00 0.0 0.0
12/16/2019 8902.00 8913.10 11.10 0.33 1.00 10.77 12.1 12.1
12/17/2019 8913.10 8923.30 10.20 0.33 1.00 9.87 11.2 11.2
12/18/2019 8923.30 8932.40 9.10 0.33 1.00 8.77 10.1 10.1
12/19/2019 8932.40 8942.30 9.90 0.33 1.00 9.57 10.9 10.9
12/20/2019 8942.30 8952.00 9.70 0.33 1.00 9.37 10.7 10.7
12/21/2019 8952.00 8962.90 10.90 0.33 1.00 10.57 11.9 11.9
12/22/2019 8962.90 8962.90 0.00 0.00 0.0 0.0
12/23/2019 8962.90 8973.10 10.20 0.33 1.00 9.87 11.2 11.2
12/24/2019 8973.10 8984.10 11.00 0.33 1.00 10.67 12.0 12.0
12/25/2019 8984.10 8984.10 0.00 0.00 0.0 0.0
12/26/2019 8984.10 8994.10 10.00 0.33 1.00 9.67 11.0 11.0
12/27/2019 8994.10 9004.00 9.90 0.33 1.00 9.57 10.9 10.9
12/28/2019 9004.00 9013.90 9.90 0.33 1.00 9.57 10.9 10.9
12/29/2019 9013.90 9013.90 0.00 0.00 0.0 0.0
12/30/2019 9013.90 9023.70 9.80 0.33 1.00 9.47 10.8 10.8
0501-005 247.20 8.25 0.00 0.00 0.00 25.00 0.00 238.95 272.20 272.20
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Rodillo Neumatico Hamm


U.A 0502-001 Operador: CLINTON YANAPA

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
12/1/2019 0.00 0.00 0.00 0.00 0.0 0.0
12/2/2019 2146.00 2157.00 11.00 0.33 1.00 10.67 12.0 12.0
12/3/2019 2157.00 2168.00 11.00 0.33 1.00 10.67 12.0 12.0
12/4/2019 2168.00 2177.80 9.80 0.33 1.00 9.47 10.8 10.8
12/5/2019 2177.80 2182.50 4.70 0.33 1.00 4.37 5.7 5.7
12/6/2019 2182.50 2191.70 9.20 0.33 1.00 8.87 10.2 10.2
12/7/2019 2191.70 2198.60 6.90 0.33 1.00 6.57 7.9 7.9
12/8/2019 2198.60 2198.60 0.00 0.00 0.0 0.0
12/9/2019 2198.60 2208.00 9.40 0.33 1.00 9.07 10.4 10.4
12/10/2019 2208.00 2219.10 11.10 0.33 1.00 10.77 12.1 12.1
12/11/2019 2219.10 2228.30 9.20 0.33 1.00 8.87 10.2 10.2
12/12/2019 2228.30 2236.20 7.90 0.33 1.00 7.57 8.9 8.9
12/13/2019 2236.20 2247.40 11.20 0.33 1.00 10.87 12.2 12.2
12/14/2019 2247.40 2255.00 7.60 0.33 1.00 7.27 8.6 8.6
12/15/2019 2255.00 2255.00 0.00 0.00 0.0 0.0
12/16/2019 2255.00 2264.70 9.70 0.33 1.00 9.37 10.7 10.7
12/17/2019 2264.70 2275.80 11.10 0.33 1.00 10.77 12.1 12.1
12/18/2019 2275.80 2283.20 7.40 0.33 1.00 7.07 8.4 8.4
12/19/2019 2283.20 2291.40 8.20 0.33 1.00 7.87 9.2 9.2
12/20/2019 2291.40 2300.60 9.20 0.33 1.00 8.87 10.2 10.2
12/21/2019 2300.60 2311.40 10.80 0.33 1.00 10.47 11.8 11.8
12/22/2019 2311.40 2320.60 9.20 0.33 1.00 8.87 10.2 10.2
12/23/2019 2320.60 2328.30 7.70 0.33 1.00 7.37 8.7 8.7
12/24/2019 2328.30 2328.30 0.00 0.00 0.0 0.0
12/25/2019 2328.30 2328.30 0.00 0.00 0.0 0.0
12/26/2019 2328.30 2337.10 8.80 0.33 1.00 8.47 9.8 9.8
12/27/2019 2337.10 2348.70 11.60 0.33 1.00 11.27 12.6 12.6
12/28/2019 2348.70 2355.50 6.80 0.33 1.00 6.47 7.8 7.8
12/29/2019 2355.50 2355.50 0.00 0.00 0.0 0.0
12/30/2019 2355.50 2367.20 11.70 0.33 1.00 11.37 12.7 12.7
12/31/2019 2367.20 2377.00 9.80 0.33 1.00 9.47 10.8 10.8
0502-001 231.00 8.25 0.00 0.00 0.00 25.00 0.00 222.75 256.00 256.00
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos

CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Rodillo Liso Doble Rola/TANDEM DYNAPAC


U.A 0504-001 Operador: Quispe Yucra Teofilo

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
12/1/2019 0.00 0.00 0.00 0.00 0.0 0.0
12/2/2019 2455.50 2466.10 10.60 0.33 1.00 10.27
12/3/2019 2466.10 2476.90 10.80 0.33 1.00 10.47
12/4/2019 2476.90 2486.00 9.10 0.33 1.00 8.77 10.1 10.1
12/5/2019 2486.00 2496.00 10.00 0.33 1.00 9.67 11.0 11.0
12/6/2019 2496.00 2505.80 9.80 0.33 1.00 9.47 10.8 10.8
12/7/2019 2505.80 2515.40 9.60 0.33 1.00 9.27 10.6 10.6
12/8/2019 2515.40 2515.40 0.00 0.00 0.0 0.0
12/9/2019 2515.40 2524.40 9.00 0.33 1.00 8.67 10.0 10.0
12/10/2019 2524.40 2533.90 9.50 0.33 1.00 9.17 10.5 10.5
12/11/2019 2533.90 2544.30 10.40 0.33 1.00 10.07 11.4 11.4
12/12/2019 2544.30 2555.60 11.30 0.33 1.00 10.97 12.3 12.3
12/13/2019 2555.60 2564.20 8.60 0.33 1.00 8.27 9.6 9.6
12/14/2019 2564.20 2573.90 9.70 0.33 1.00 9.37 10.7 10.7
12/15/2019 2573.90 2573.90 0.00 0.00 0.0 0.0
12/16/2019 2573.90 2584.30 10.40 0.33 1.00 10.07 11.4 11.4
12/17/2019 2584.30 2595.30 11.00 0.33 1.00 10.67 12.0 12.0
12/18/2019 2595.30 2606.40 11.10 0.33 1.00 10.77 12.1 12.1
12/19/2019 2606.40 2614.80 8.40 0.33 1.00 8.07 9.4 9.4
12/20/2019 2614.80 2623.70 8.90 0.33 1.00 8.57 9.9 9.9
12/21/2019 2623.70 2632.70 9.00 0.33 1.00 8.67 10.0 10.0
12/22/2019 2632.70 2632.70 0.00 0.00 0.0 0.0
12/23/2019 2632.70 2641.60 8.90 0.33 1.00 8.57 9.9 9.9
12/24/2019 2641.60 2650.90 9.30 0.33 1.00 8.97 10.3 10.3
12/25/2019 2650.90 2650.90 0.00 0.00 0.0 0.0
12/26/2019 2650.90 2660.00 9.10 0.33 1.00 8.77 10.1 10.1
12/27/2019 2660.00 2671.20 11.20 0.33 1.00 10.87 12.2 12.2
12/28/2019 2671.20 2681.00 9.80 0.33 1.00 9.47 10.8 10.8
12/29/2019 2681.00 2681.00 0.00 0.00 0.0 0.0
12/30/2019 2681.00 2690.20 9.20 0.33 1.00 8.87 10.2 10.2
12/31/2019 2690.20 2700.00 9.80 0.33 1.00 9.47 10.8 10.8
0504-001 244.50 8.25 0.00 0.00 0.00 25.00 0.00 236.25 246.10 246.10
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Rodillo Liso Doble Rolla


U.A 0504-002 Operador: Quispe Yucra Teofilo

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
12/1/2019 0.00 0.00 0.00 0.00 0.0 0.0
12/2/2019 147.00 157.00 10.00 0.33 1.00 9.67 11.0 11.0
12/3/2019 157.00 166.00 9.00 0.33 1.00 8.67 10.0 10.0
12/4/2019 166.00 176.50 10.50 0.33 1.00 10.17 11.5 11.5
12/5/2019 176.50 186.80 10.30 0.33 1.00 9.97 11.3 11.3
12/6/2019 186.80 196.40 9.60 0.33 1.00 9.27 10.6 10.6
12/7/2019 196.40 205.90 9.50 0.33 1.00 9.17 10.5 10.5
12/8/2019 205.90 205.90 0.00 0.00 0.0 0.0
12/9/2019 217.50 227.80 10.30 0.33 1.00 9.97 11.3 11.3
12/10/2019 227.80 238.40 10.60 0.33 1.00 10.27 11.6 11.6
12/11/2019 238.40 248.50 10.10 0.33 1.00 9.77 11.1 11.1
12/12/2019 248.50 257.90 9.40 0.33 1.00 9.07 10.4 10.4
12/13/2019 257.90 268.70 10.80 0.33 1.00 10.47 11.8 11.8
12/14/2019 268.70 278.80 10.10 0.33 1.00 9.77 11.1 11.1
12/15/2019 278.80 278.80 0.00 0.00 0.0 0.0
12/16/2019 278.80 288.60 9.80 0.33 1.00 9.47 10.8 10.8
12/17/2019 288.60 298.70 10.10 0.33 1.00 9.77 11.1 11.1
12/18/2019 298.70 308.00 9.30 0.33 1.00 8.97 10.3 10.3
12/19/2019 308.00 318.00 10.00 0.33 1.00 9.67 11.0 11.0
12/20/2019 318.00 328.10 10.10 0.33 1.00 9.77 11.1 11.1
12/21/2019 328.10 338.30 10.20 0.33 1.00 9.87 11.2 11.2
12/22/2019 338.30 338.30 0.00 0.00 0.0 0.0
12/23/2019 338.30 348.50 10.20 0.33 1.00 9.87 11.2 11.2
12/24/2019 348.50 358.00 9.50 0.33 1.00 9.17 10.5 10.5
12/25/2019 358.00 358.00 0.00 0.00 0.0 0.0
12/26/2019 358.00 368.00 10.00 0.33 1.00 9.67 11.0 11.0
12/27/2019 368.00 377.00 9.00 0.33 1.00 8.67 10.0 10.0
12/28/2019 377.00 387.20 10.20 0.33 1.00 9.87 11.2 11.2
12/29/2019 387.20 387.20 0.00 0.00 0.0 0.0
12/30/2019 387.20 396.00 8.80 0.33 1.00 8.47 9.8 9.8
12/31/2019 396.00 406.00 10.00 0.33 1.00 9.67 11.0 11.0
0504-002 247.40 8.25 0.00 0.00 0.00 25.00 0.00 239.15 272.40 272.40
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos

CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Cargador Frontal


U.A 0962-002 Operador: EDWIN CONDORI SIRENA

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs Previstas
FECHA Hr. In Hr. Fn OBSERVACION

12/1/2019 0.00 0.00 0.00 0.00 0.0 0.0


12/2/2019 314.00 324.00 10.00 0.33 9.67 10.0 10.0
12/3/2019 324.00 335.10 11.10 0.33 10.77 11.1 11.1
12/4/2019 335.10 344.70 9.60 0.33 9.27 9.6 9.6
12/5/2019 344.70 355.60 10.90 0.33 10.57 10.9 10.9
12/6/2019 355.60 364.70 9.10 0.33 8.77 9.1 9.1
12/7/2019 364.70 374.80 10.10 0.33 1.00 9.77 11.1 11.1
12/8/2019 374.80 374.80 0.00 0.00 0.0 0.0
12/9/2019 374.80 384.90 10.10 0.33 1.00 9.77 11.1 11.1
12/10/2019 384.90 394.00 9.10 0.33 1.00 8.77 10.1 10.1
12/11/2019 394.00 404.20 10.20 0.33 1.00 9.87 11.2 11.2
12/12/2019 404.20 413.90 9.70 0.33 1.00 9.37 10.7 10.7
12/13/2019 413.90 422.80 8.90 0.33 1.00 8.57 9.9 9.9
12/14/2019 422.80 433.90 11.10 0.33 1.00 10.77 12.1 12.1
12/15/2019 433.90 433.90 0.00 0.00 0.0 0.0
12/16/2019 433.90 444.00 10.10 0.33 1.00 9.77 11.1 11.1
12/17/2019 444.00 454.00 10.00 0.33 1.00 9.67 11.0 11.0
12/18/2019 454.00 463.70 9.70 0.33 1.00 9.37 10.7 10.7
12/19/2019 463.70 475.00 11.30 0.33 1.00 10.97 12.3 12.3
12/20/2019 475.00 483.70 8.70 0.33 1.00 8.37 9.7 9.7
12/21/2019 483.70 492.50 8.80 0.33 1.00 8.47 9.8 9.8
12/22/2019 492.50 492.50 0.00 0.00 0.0 0.0
12/23/2019 492.50 501.30 8.80 0.33 1.00 8.47 9.8 9.8
12/24/2019 501.30 511.60 10.30 0.33 1.00 9.97 11.3 11.3
12/25/2019 511.60 511.60 0.00 0.00 0.0 0.0
12/26/2019 511.60 522.00 10.40 0.33 1.00 10.07 11.4 11.4
12/27/2019 522.00 533.00 11.00 0.33 1.00 10.67 12.0 12.0
12/28/2019 533.00 542.00 9.00 0.33 1.00 8.67 10.0 10.0
12/29/2019 542.00 542.00 0.00 0.00 0.0 0.0
12/30/2019 542.00 553.10 11.10 0.33 1.00 10.77 12.1 12.1
12/31/2019 553.10 563.00 9.90 0.33 1.00 9.57 10.9 10.9
0962-002 249.00 8.25 0.00 0.00 0.00 20.00 0.00 240.75 269.00 269.00
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Camion Volquete


U.A 1170-014 Operador: YORANDIR LIMA QUISPE

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/30/2019 11099.00 11109.00 10.00 0.17 1.00 9.83 11.0 11.0
12/1/2019 11109.00 11109.00 0.00 0.00 0.0 0.0
12/2/2019 11109.00 11119.50 10.50 0.17 1.00 10.33 11.5 11.5
12/3/2019 11119.50 11129.70 10.20 0.17 1.00 10.03 11.2 11.2
12/4/2019 11129.70 11138.70 9.00 0.17 1.00 8.83 10.0 10.0
12/5/2019 11138.70 11147.90 9.20 0.17 1.00 9.03 10.2 10.2
12/6/2019 11147.90 11158.10 10.20 0.17 1.00 10.03 11.2 11.2
12/7/2019 11158.10 11168.30 10.20 0.17 1.00 10.03 11.2 11.2
12/8/2019 11168.30 11168.30 0.00 0.00 0.0 0.0
12/9/2019 11168.30 11177.50 9.20 0.17 1.00 9.03 10.2 10.2
12/10/2019 11177.50 11188.10 10.60 0.17 1.00 10.43 11.6 11.6
12/11/2019 11188.10 11197.80 9.70 0.17 1.00 9.53 10.7 10.7
12/12/2019 11197.80 11207.00 9.20 0.17 1.00 9.03 10.2 10.2
12/13/2019 11207.00 11217.20 10.20 0.17 1.00 10.03 11.2 11.2
12/14/2019 11217.20 11227.30 10.10 0.17 1.00 9.93 11.1 11.1
12/15/2019 11227.30 11227.30 0.00 0.00 0.0 0.0
12/16/2019 11227.30 11238.40 11.10 0.17 1.00 10.93 12.1 12.1
12/17/2019 11238.40 11247.90 9.50 0.17 1.00 9.33 10.5 10.5
12/18/2019 11247.90 11258.00 10.10 0.17 1.00 9.93 11.1 11.1
12/19/2019 11258.00 11269.30 11.30 0.17 1.00 11.13 12.3 12.3
12/20/2019 11269.30 11278.80 9.50 0.17 1.00 9.33 10.5 10.5
12/21/2019 11278.80 11288.00 9.20 0.17 1.00 9.03 10.2 10.2
12/22/2019 11288.00 11288.00 0.00 0.00 0.0 0.0
12/23/2019 11288.00 11297.40 9.40 0.17 1.00 9.23 10.4 10.4
12/24/2019 11297.40 11306.80 9.40 0.17 1.00 9.23 10.4 10.4
12/25/2019 11306.80 11306.80 0.00 0.00 0.0 0.0
12/26/2019 11306.80 11315.40 8.60 0.17 1.00 8.43 9.6 9.6
12/27/2019 11315.40 11325.00 9.60 0.17 1.00 9.43 10.6 10.6
12/28/2019 11325.00 11335.80 10.80 0.17 1.00 10.63 11.8 11.8
12/29/2019 11335.80 11335.80 0.00 0.00 0.0 0.0
12/30/2019 11335.80 11343.50 7.70 0.17 1.00 7.53 8.7 8.7
1170-014 244.50 4.25 0.00 0.00 0.00 25.00 0.00 240.25 269.50 269.50
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO CAMION VOLQUETE


U.A 1170-015 Operador: FELIPE TAPIA QUISPE

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/27/2019 10827.00 10836.80 9.80 0.17 1.00 9.63 10.8 10.8
11/28/2019 10836.80 10846.10 9.30 0.17 1.00 9.13 10.3 10.3
11/29/2019 10846.10 10856.00 9.90 0.17 1.00 9.73 10.9 10.9
11/30/2019 10856.00 10865.70 9.70 0.17 1.00 9.53 10.7 10.7
12/1/2019 10865.70 10865.70 0.00 0.00 0.0 0.0
12/2/2019 10865.70 10875.00 9.30 0.17 9.13 9.3 9.3
12/3/2019 10875.00 10886.20 11.20 0.17 1.00 11.03 12.2 12.2
12/4/2019 10886.20 10896.00 9.80 0.17 1.00 9.63 10.8 10.8
12/5/2019 10896.00 10906.00 10.00 0.17 1.00 9.83 11.0 11.0
12/6/2019 10906.00 10916.00 10.00 0.17 1.00 9.83 11.0 11.0
12/7/2019 10916.00 10925.40 9.40 0.17 1.00 9.23 10.4 10.4
12/8/2019 10925.40 10925.40 0.00 0.00 0.0 0.0
12/9/2019 10925.40 10935.30 9.90 0.17 1.00 9.73 10.9 10.9
12/10/2019 10935.30 10945.40 10.10 0.17 1.00 9.93 11.1 11.1
12/11/2019 10945.40 10954.80 9.40 0.17 1.00 9.23 10.4 10.4
12/12/2019 10954.80 10964.70 9.90 0.17 1.00 9.73 10.9 10.9
12/13/2019 10964.70 10973.80 9.10 0.17 1.00 8.93 10.1 10.1
12/14/2019 10973.80 10984.80 11.00 0.17 1.00 10.83 12.0 12.0
12/15/2019 10984.80 10984.80 0.00 0.00 0.0 0.0
12/16/2019 10984.80 10995.20 10.40 0.17 1.00 10.23 11.4 11.4
12/17/2019 10995.20 11005.00 9.80 0.17 1.00 9.63 10.8 10.8
12/18/2019 11005.00 11016.30 11.30 0.17 1.00 11.13 12.3 12.3
12/19/2019 11016.30 11027.10 10.80 0.17 1.00 10.63 11.8 11.8
12/20/2019 11027.10 11037.30 10.20 0.17 1.00 10.03 11.2 11.2
12/21/2019 11037.30 11047.50 10.20 0.17 1.00 10.03 11.2 11.2
12/22/2019 11047.50 11047.50 0.00 0.00 0.0 0.0
12/23/2019 11047.50 11057.60 10.10 0.17 1.00 9.93 11.1 11.1
12/24/2019 11057.60 11067.40 9.80 0.17 1.00 9.63 10.8 10.8
12/25/2019 11067.40 11067.40 0.00 0.00 0.0 0.0
12/26/2019 11067.40 11076.80 9.40 0.17 1.00 9.23 10.4 10.4
12/27/2019 11076.80 11086.20 9.40 0.17 1.00 9.23 10.4 10.4
12/28/2019 11086.20 11096.70 10.50 0.17 1.00 10.33 11.5 11.5
12/29/2019 11096.70 11096.70 0.00 0.00 0.0 0.0
12/30/2019 11096.70 11105.90 9.20 0.17 1.00 9.03 10.2 10.2
1170-015 278.90 4.76 0.00 0.00 0.00 27.00 0.00 274.14 305.90 305.90
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Camion Volquete


U.A 1170-016 Operador: ENRIQUE MONTALVO VILCA

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/30/2019 11535.60 11545.60 10.00 0.17 1.00 9.83 11.0 11.0
12/1/2019 11545.60 11545.60 0.00 0.00 0.0 0.0
12/2/2019 11545.60 11556.60 11.00 0.17 1.00 10.83 12.0 12.0
12/3/2019 11541.90 11551.60 9.70 0.17 1.00 9.53 10.7 10.7
12/4/2019 11551.60 11561.70 10.10 0.17 1.00 9.93 11.1 11.1
12/5/2019 11561.70 11571.60 9.90 0.17 1.00 9.73 10.9 10.9
12/6/2019 11571.60 11582.00 10.40 0.17 1.00 10.23 11.4 11.4
12/7/2019 11582.00 11593.40 11.40 0.17 1.00 11.23 12.4 12.4
12/8/2019 11593.40 11593.40 0.00 0.00 0.0 0.0
12/9/2019 11593.40 11603.70 10.30 0.17 1.00 10.13 11.3 11.3
12/10/2019 11603.70 11614.10 10.40 0.17 1.00 10.23 11.4 11.4
12/11/2019 11614.10 11623.80 9.70 0.17 1.00 9.53 10.7 10.7
12/12/2019 11623.80 11634.50 10.70 0.17 1.00 10.53 11.7 11.7
12/13/2019 11634.50 11645.00 10.50 0.17 1.00 10.33 11.5 11.5
12/14/2019 11645.00 11654.00 9.00 0.17 1.00 8.83 10.0 10.0
12/15/2019 11654.00 11654.00 0.00 0.00 0.0 0.0
12/16/2019 11654.00 11664.00 10.00 0.17 1.00 9.83 11.0 11.0
12/17/2019 11664.00 11674.50 10.50 0.17 1.00 10.33 11.5 11.5
12/18/2019 11674.50 11684.00 9.50 0.17 1.00 9.33 10.5 10.5
12/19/2019 11684.00 11694.00 10.00 0.17 1.00 9.83 11.0 11.0
12/20/2019 11694.00 11703.90 9.90 0.17 1.00 9.73 10.9 10.9
12/21/2019 11703.90 11713.70 9.80 0.17 1.00 9.63 10.8 10.8
12/22/2019 11653.20 11653.20 0.00 0.17 1.00 -0.17 1.0 1.0
12/23/2019 11653.20 11662.60 9.40 0.17 1.00 9.23 10.4 10.4
12/24/2019 11662.60 11672.00 9.40 0.17 1.00 9.23 10.4 10.4
12/25/2019 11672.00 11672.00 0.00 0.00 0.0 0.0
12/26/2019 11672.00 11683.60 11.60 0.17 1.00 11.43 12.6 12.6
12/27/2019 11683.60 11694.10 10.50 0.17 1.00 10.33 11.5 11.5
12/28/2019 11694.10 11704.00 9.90 0.17 1.00 9.73 10.9 10.9
12/29/2019 11704.00 11704.00 0.00 0.00 0.0 0.0
12/30/2019 11704.00 11713.80 9.80 0.17 1.00 9.63 10.8 10.8
1170-016 253.40 4.42 0.00 0.00 0.00 26.00 0.00 248.98 279.40 279.40
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Camion Volquete


U.A 1170-017 Operador: VALENTIN MAMANI MAMANI

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/30/2019 9472.80 9482.00 9.20 0.17 1.00 9.03 10.2 10.2
12/1/2019 9482.00 9482.00 0.00 0.00 0.0 0.0
12/2/2019 9482.00 9492.50 10.50 0.17 1.00 10.33 11.5 11.5
12/3/2019 9492.50 9502.80 10.30 0.17 1.00 10.13 11.3 11.3
12/4/2019 9502.80 9512.70 9.90 0.17 1.00 9.73 10.9 10.9
12/5/2019 9512.70 9522.60 9.90 0.17 1.00 9.73 10.9 10.9
12/6/2019 9522.60 9532.40 9.80 0.17 1.00 9.63 10.8 10.8
12/7/2019 9532.40 9543.00 10.60 0.17 1.00 10.43 11.6 11.6
12/8/2019 9543.00 9543.00 0.00 0.00 0.0 0.0
12/9/2019 9543.00 9553.00 10.00 0.17 1.00 9.83 11.0 11.0
12/10/2019 9553.00 9563.40 10.40 0.17 1.00 10.23 11.4 11.4
12/11/2019 9563.40 9573.30 9.90 0.17 1.00 9.73 10.9 10.9
12/12/2019 9573.30 9583.40 10.10 0.17 1.00 9.93 11.1 11.1
12/13/2019 9583.40 9595.00 11.60 0.17 1.00 11.43 12.6 12.6
12/14/2019 9595.00 9604.00 9.00 0.17 1.00 8.83 10.0 10.0
12/15/2019 9604.00 9604.00 0.00 0.00 0.0 0.0
12/16/2019 9604.00 9614.00 10.00 0.17 1.00 9.83 11.0 11.0
12/17/2019 9614.00 9623.00 9.00 0.17 1.00 8.83 10.0 10.0
12/18/2019 9623.00 9632.50 9.50 0.17 1.00 9.33 10.5 10.5
12/19/2019 9632.50 9643.90 11.40 0.17 1.00 11.23 12.4 12.4
12/20/2019 9643.90 9652.70 8.80 0.17 1.00 8.63 9.8 9.8
12/21/2019 9652.70 9662.80 10.10 0.17 1.00 9.93 11.1 11.1
12/22/2019 9662.80 9662.80 0.00 0.17 1.00 -0.17 1.0 1.0
12/23/2019 9662.80 9673.40 10.60 0.17 1.00 10.43 11.6 11.6
12/24/2019 9673.40 9682.80 9.40 0.17 1.00 9.23 10.4 10.4
12/25/2019 9682.80 9682.80 0.00 0.00 0.0 0.0
12/26/2019 9682.80 9692.90 10.10 0.17 1.00 9.93 11.1 11.1
12/27/2019 9692.90 9702.40 9.50 0.17 1.00 9.33 10.5 10.5
12/28/2019 9702.40 9714.00 11.60 0.17 1.00 11.43 12.6 12.6
12/29/2019 9714.00 9714.00 0.00 0.00 0.0 0.0
12/30/2019 9714.00 9723.00 9.00 0.17 1.00 8.83 10.0 10.0
1170-017 250.20 4.42 0.00 0.00 0.00 26.00 0.00 245.78 276.20 276.20
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Camion Volquete


U.A 1170-018 Operador: JAVIER QUENTA BAUTISTA

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
12/1/2019 0.00 0.00 0.00 0.00 0.0 0.0
12/2/2019 5452.00 5462.00 10.00 0.17 1.00 9.83 11.0 11.0
12/3/2019 5462.00 5472.30 10.30 0.17 1.00 10.13 11.3 11.3
12/4/2019 5472.30 5482.60 10.30 0.17 1.00 10.13 11.3 11.3
12/5/2019 5482.60 5492.40 9.80 0.17 1.00 9.63 10.8 10.8
12/6/2019 5492.40 5502.00 9.60 0.17 1.00 9.43 10.6 10.6
12/7/2019 5502.00 5512.50 10.50 0.17 1.00 10.33 11.5 11.5
12/8/2019 5512.50 5512.50 0.00 0.00 0.0 0.0
12/9/2019 5512.50 5523.60 11.10 0.17 1.00 10.93 12.1 12.1
12/10/2019 5523.60 5532.70 9.10 0.17 1.00 8.93 10.1 10.1
12/11/2019 5532.70 5543.90 11.20 0.17 1.00 11.03 12.2 12.2
12/12/2019 5543.90 5553.10 9.20 0.17 1.00 9.03 10.2 10.2
12/13/2019 5553.10 5563.40 10.30 0.17 1.00 10.13 11.3 11.3
12/14/2019 5563.40 5573.90 10.50 0.17 1.00 10.33 11.5 11.5
12/15/2019 5573.90 5576.90 3.00 3.00 3.0 3.0
12/16/2019 5576.90 5586.90 10.00 0.17 1.00 9.83 11.0 11.0
12/17/2019 5586.90 5596.80 9.90 0.17 1.00 9.73 10.9 10.9
12/18/2019 5596.80 5606.90 10.10 0.17 1.00 9.93 11.1 11.1 Piedra Chancada 3/4 Muñani 9 Hh.
12/19/2019 5606.90 5616.60 9.70 0.17 1.00 9.53 10.7 10.7
12/20/2019 5616.60 5627.90 11.30 0.17 1.00 11.13 12.3 12.3
12/21/2019 5627.90 5638.20 10.30 0.17 1.00 10.13 11.3 11.3
12/22/2019 5638.20 5638.20 0.00 0.17 1.00 -0.17 1.0 1.0
12/23/2019 5638.20 5649.60 11.40 0.17 1.00 11.23 12.4 12.4
12/24/2019 5649.60 5658.90 9.30 0.17 1.00 9.13 10.3 10.3
12/25/2019 5658.90 5658.90 0.00 0.00 0.0 0.0
12/26/2019 5658.90 5668.90 10.00 0.17 1.00 9.83 11.0 11.0
12/27/2019 5668.90 5679.50 10.60 0.17 1.00 10.43 11.6 11.6
12/28/2019 5679.50 5688.90 9.40 0.17 1.00 9.23 10.4 10.4
12/29/2019 5688.90 5688.90 0.00 0.00 0.0 0.0
12/30/2019 5688.90 5698.40 9.50 0.17 1.00 9.33 10.5 10.5
12/31/2019 5698.40 5708.00 9.60 0.17 1.00 5.18 6.4 6.4
1170-018 256.00 4.42 0.00 0.00 0.00 26.00 0.00 247.33 277.75 277.75
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Camion VolquV8L-768


U.A 1170-019 Operador: HENRY OTAZU ALEJO

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/29/2019 5303.77 5314.17 10.40 0.17 1.00 10.23 11.4 11.4
11/30/2019 5314.17 5324.00 9.83 0.17 1.00 9.66 10.8 10.8
12/1/2019 5324.00 5324.00 0.00 0.00 0.0 0.0
12/2/2019 5324.00 5335.80 11.80 0.17 11.63 11.8 11.8
12/3/2019 5335.80 5345.90 10.10 0.17 1.00 9.93 11.1 11.1
12/4/2019 5345.90 5355.80 9.90 0.17 9.73 9.9 9.9
12/5/2019 5355.80 5365.70 9.90 0.17 1.00 9.73 10.9 10.9
12/6/2019 5365.70 5375.40 9.70 0.17 1.00 9.53 10.7 10.7
12/7/2019 5375.40 5385.60 10.20 0.17 1.00 10.03 11.2 11.2
12/8/2019 5385.60 5385.60 0.00 0.00 0.0 0.0
12/9/2019 5385.60 5396.30 10.70 0.17 1.00 10.53 11.7 11.7
12/10/2019 5396.30 5406.20 9.90 0.17 1.00 9.73 10.9 10.9
12/11/2019 5406.20 5416.50 10.30 0.17 1.00 10.13 11.3 11.3 no hay partes diarios
12/12/2019 5416.50 5426.60 10.10 0.17 1.00 9.93 11.1 11.1 no hay partes diarios
12/13/2019 5426.60 5435.70 9.10 0.17 1.00 8.93 10.1 10.1 no hay partes diarios
12/14/2019 5435.70 5446.80 11.10 0.17 1.00 10.93 12.1 12.1
12/15/2019 5446.80 5446.80 0.00 0.00 0.0 0.0
12/16/2019 5446.80 5456.70 9.90 0.17 1.00 9.73 10.9 10.9
12/17/2019 5456.70 5466.30 9.60 0.17 1.00 9.43 10.6 10.6
12/18/2019 5466.30 5476.80 10.50 0.17 1.00 10.33 11.5 11.5 PIEDRA CHANCADA DE 3/4 Muñani 4.5Hr.
12/19/2019 5476.80 5486.50 9.70 0.17 1.00 9.53 10.7 10.7
12/20/2019 5486.50 5496.30 9.80 0.17 1.00 9.63 10.8 10.8
12/21/2019 5496.30 5506.40 10.10 0.17 1.00 9.93 11.1 11.1
12/22/2019 5506.40 5516.60 10.20 0.17 1.00 10.03 11.2 11.2
12/23/2019 5516.60 5526.70 10.10 0.17 1.00 9.93 11.1 11.1
12/24/2019 5526.70 5536.70 10.00 0.17 9.83 10.0 10.0
12/25/2019 5536.70 5536.70 0.00 0.00 0.0 0.0
12/26/2019 5536.70 5546.40 9.70 0.17 1.00 9.53 10.7 10.7
12/27/2019 5546.40 5556.50 10.10 0.17 1.00 9.93 11.1 11.1
12/28/2019 5556.50 5567.00 10.50 0.17 1.00 10.33 11.5 11.5
12/29/2019 5567.00 5567.00 0.00 0.00 0.0 0.0
12/30/2019 5567.00 5577.00 10.00 0.17 1.00 9.83 11.0 11.0
1170-019 273.23 4.59 0.00 0.00 0.00 24.00 0.00 268.64 297.23 297.23
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Camion VolquV8L-773


U.A 1170-020 Operador: CLAUDIO MAMANI T.

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/30/2019 6233.00 6243.90 10.90 0.17 1.00 10.73 11.9 11.9
12/1/2019 6243.90 6243.90 0.00 0.00 0.0 0.0
12/2/2019 6243.90 6253.00 9.10 0.17 1.00 8.93 10.1 10.1
12/3/2019 6253.00 6263.52 10.52 0.17 1.00 10.35 11.5 11.5
12/4/2019 6256.00 6266.00 10.00 0.17 1.00 9.83 11.0 11.0
12/5/2019 6266.00 6277.00 11.00 0.17 1.00 10.83 12.0 12.0
12/6/2019 6277.00 6287.00 10.00 0.17 9.83 10.0 10.0
12/7/2019 6287.00 6296.80 9.80 0.17 1.00 9.63 10.8 10.8
12/8/2019 6296.80 6296.80 0.00 0.00 0.0 0.0
12/9/2019 6296.80 6308.00 11.20 0.17 1.00 11.03 12.2 12.2
12/10/2019 6308.00 6317.60 9.60 0.17 1.00 9.43 10.6 10.6
12/11/2019 6317.60 6328.40 10.80 0.17 1.00 10.63 11.8 11.8
12/12/2019 6328.40 6337.80 9.40 0.17 9.23 9.4 9.4
12/13/2019 6337.80 6347.50 9.70 0.17 1.00 9.53 10.7 10.7
12/14/2019 6347.50 6356.70 9.20 0.17 1.00 9.03 10.2 10.2
12/15/2019 6356.70 6356.70 0.00 0.00 0.0 0.0
12/16/2019 6356.70 6366.60 9.90 0.17 9.73 9.9 9.9
12/17/2019 6366.60 6376.80 10.20 0.17 1.00 10.03 11.2 11.2
12/18/2019 6376.80 6386.00 9.20 0.17 1.00 9.03 10.2 10.2 PIEDRA CHANCADA DE 3/4 Muñani 4Hr.
12/19/2019 6386.00 6396.70 10.70 0.17 1.00 10.53 11.7 11.7
12/20/2019 6396.70 6406.00 9.30 0.17 1.00 9.13 10.3 10.3
12/21/2019 6406.00 6416.50 10.50 0.17 1.00 10.33 11.5 11.5
12/22/2019 6416.50 6416.50 0.00 0.0 0.0
12/23/2019 6416.50 6426.60 10.10 0.17 1.00 9.93 11.1 11.1
12/24/2019 6426.60 6436.40 9.80 0.17 1.00 9.63 10.8 10.8
12/25/2019 6436.40 6436.40 0.00 0.00 0.0 0.0
12/26/2019 6436.40 6446.30 9.90 0.17 1.00 9.73 10.9 10.9
12/27/2019 6446.30 6456.20 9.90 0.17 1.00 9.73 10.9 10.9
12/28/2019 6456.20 6467.80 11.60 0.17 1.00 11.43 12.6 12.6
12/29/2019 6467.80 6467.80 0.00 0.00 0.0 0.0
12/30/2019 6467.80 6477.90 10.10 0.17 1.00 9.93 11.1 11.1
1170-020 252.42 4.25 0.00 0.00 0.00 22.00 0.00 248.17 274.42 274.42
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos

CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Camion VolquV8L-776


U.A 1170-021 Operador: FRANCISCO CHOQUE MEDINA

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/30/2019 4592.20 4604.20 12.00 0.17 1.00 11.83 13.0 13.0
12/1/2019 4604.20 4604.20 0.00 0.00 0.0 0.0
12/2/2019 4604.20 4614.00 9.80 0.17 1.00 9.63 10.8 10.8
12/3/2019 4614.00 4624.30 10.30 0.17 1.00 10.13 11.3 11.3
12/4/2019 4624.30 4634.20 9.90 0.17 1.00 9.73 10.9 10.9
12/5/2019 4634.20 4644.30 10.10 0.17 1.00 9.93 11.1 11.1
12/6/2019 4644.30 4654.80 10.50 0.17 1.00 10.33 11.5 11.5
12/7/2019 4654.80 4664.50 9.70 0.17 1.00 9.53 10.7 10.7
12/8/2019 4664.50 4664.50 0.00 0.00 0.0 0.0
12/9/2019 4664.50 4674.50 10.00 0.17 1.00 9.83 11.0 11.0
12/10/2019 4674.50 4686.40 11.90 0.17 1.00 11.73 12.9 12.9
12/11/2019 4686.40 4696.40 10.00 0.17 1.00 9.83 11.0 11.0
12/12/2019 4696.40 4705.90 9.50 0.17 1.00 9.33 10.5 10.5
12/13/2019 4705.90 4716.80 10.90 0.17 1.00 10.73 11.9 11.9
12/14/2019 4716.80 4726.70 9.90 0.17 1.00 9.73 10.9 10.9
12/15/2019 4726.70 4726.70 0.00 0.00 0.0 0.0
12/16/2019 4726.70 4737.40 10.70 0.17 1.00 10.53 11.7 11.7
12/17/2019 4737.40 4746.80 9.40 0.17 1.00 9.23 10.4 10.4
12/18/2019 4746.80 4756.70 9.90 0.17 1.00 9.73 10.9 10.9 Mantenimiento
12/19/2019 4756.70 4767.80 11.10 0.17 1.00 10.93 12.1 12.1
12/20/2019 4767.80 4777.10 9.30 0.17 1.00 9.13 10.3 10.3
12/21/2019 4777.10 4786.50 9.40 0.17 1.00 9.23 10.4 10.4
12/22/2019 4786.50 4786.50 0.00 0.00 0.0 0.0
12/23/2019 4786.50 4797.10 10.60 0.17 1.00 10.43 11.6 11.6
12/24/2019 4797.10 4807.00 9.90 0.17 1.00 9.73 10.9 10.9
12/25/2019 4807.00 4807.00 0.00 0.00 0.0 0.0
12/26/2019 4807.00 4818.90 11.90 0.17 1.00 11.73 12.9 12.9
12/27/2019 4818.90 4827.90 9.00 0.17 1.00 8.83 10.0 10.0
12/28/2019 4827.90 4838.60 10.70 0.17 1.00 10.53 11.7 11.7
12/29/2019 4838.60 4838.60 0.00 0.00 0.0 0.0
12/30/2019 4838.60 4848.00 9.40 0.17 1.00 9.23 10.4 10.4
1170-021 255.80 4.25 0.00 0.00 0.00 25.00 0.00 251.55 280.80 280.80
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Camion Volquete


U.A 1170-022 Operador: JULIAN CRUZ RAMOS

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/30/2019 4765.59 4775.00 9.41 0.17 1.00 9.24 10.4 10.4
12/1/2019 4775.00 4775.00 0.00 0.0 0.0
12/2/2019 4775.00 4785.19 10.19 0.17 1.00 10.02 11.2 11.2
12/3/2019 4785.19 4795.90 10.71 0.17 1.00 10.54 11.7 11.7
12/4/2019 4795.90 4804.90 9.00 0.17 1.00 8.83 10.0 10.0
12/5/2019 4804.90 4815.70 10.80 0.17 10.63 10.8 10.8
12/6/2019 4815.70 4826.10 10.40 0.17 1.00 10.23 11.4 11.4
12/7/2019 4826.10 4836.40 10.30 0.17 1.00 10.13 11.3 11.3
12/8/2019 4836.40 4836.40 0.00 0.00 0.0 0.0
12/9/2019 4836.40 4846.70 10.30 0.17 1.00 10.13 11.3 11.3
12/10/2019 4846.70 4857.10 10.40 0.17 1.00 10.23 11.4 11.4
12/11/2019 4857.10 4868.30 11.20 0.17 1.00 11.03 12.2 12.2
12/12/2019 4868.30 4878.00 9.70 0.17 1.00 9.53 10.7 10.7
12/13/2019 4878.00 4888.60 10.60 0.17 1.00 10.43 11.6 11.6
12/14/2019 4888.60 4898.70 10.10 0.17 1.00 9.93 11.1 11.1
12/15/2019 4898.70 4898.70 0.00 0.00 0.0 0.0
12/16/2019 4898.70 4908.00 9.30 0.17 1.00 9.13 10.3 10.3
12/17/2019 4908.00 4918.70 10.70 0.17 1.00 10.53 11.7 11.7
12/18/2019 4918.70 4928.70 10.00 0.17 1.00 9.83 11.0 11.0
12/19/2019 4928.70 4937.80 9.10 0.17 1.00 8.93 10.1 10.1
12/20/2019 4937.80 4948.70 10.90 0.17 1.00 10.73 11.9 11.9
12/21/2019 4948.70 4959.10 10.40 0.17 1.00 10.23 11.4 11.4
12/22/2019 4959.10 4959.10 0.00 0.17 1.00 -0.17 1.0 1.0
12/23/2019 4959.10 4968.70 9.60 0.17 1.00 9.43 10.6 10.6
12/24/2019 4968.70 4979.40 10.70 10.70 10.7 10.7
12/25/2019 4979.40 4979.40 0.00 0.00 0.0 0.0
12/26/2019 4979.40 4989.50 10.10 0.17 1.00 9.93 11.1 11.1
12/27/2019 4989.50 4999.70 10.20 0.17 1.00 10.03 11.2 11.2
12/28/2019 4999.70 5009.50 9.80 0.17 1.00 9.63 10.8 10.8
12/29/2019 5009.50 5009.50 0.00 0.00 0.0 0.0
12/30/2019 5009.50 5019.80 10.30 0.17 1.00 10.13 11.3 11.3
1170-022 254.21 4.25 0.00 0.00 0.00 24.00 0.00 249.96 278.21 278.21
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Camion Volquete


U.A 1170-023 Operador: CHUPA MALDONADO EVER

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/28/2019 4472.46 4483.00 10.54 0.17 1.00 10.37 11.5 11.5
11/29/2019 4483.00 4493.80 10.80 0.17 1.00 10.63 11.8 11.8
11/30/2019 4493.80 4503.40 9.60 0.17 1.00 9.43 10.6 10.6
12/1/2019 4503.40 4503.40 0.00 0.00 0.0 0.0
12/2/2019 4503.40 4515.40 12.00 0.17 1.00 11.83 13.0 13.0
12/3/2019 4515.40 4526.00 10.60 0.17 1.00 10.43 11.6 11.6
12/4/2019 4526.00 4536.40 10.40 0.17 1.00 10.23 11.4 11.4
12/5/2019 4536.40 4546.50 10.10 0.17 1.00 9.93 11.1 11.1
12/6/2019 4546.50 4556.40 9.90 0.17 1.00 9.73 10.9 10.9
12/7/2019 4556.40 4567.40 11.00 0.17 1.00 10.83 12.0 12.0
12/8/2019 4567.40 4567.40 0.00 0.00 0.0 0.0
12/9/2019 4567.40 4576.80 9.40 0.17 1.00 9.23 10.4 10.4
12/10/2019 4576.80 4586.90 10.10 0.17 1.00 9.93 11.1 11.1
12/11/2019 4586.90 4596.30 9.40 0.17 1.00 9.23 10.4 10.4
12/12/2019 4596.30 4606.00 9.70 0.17 1.00 9.53 10.7 10.7
12/13/2019 4606.00 4617.80 11.80 0.17 1.00 11.63 12.8 12.8
12/14/2019 4617.80 4628.90 11.10 0.17 1.00 10.93 12.1 12.1
12/15/2019 4628.90 4638.90 10.00 10.00 10.0 10.0
12/16/2019 4638.90 4649.70 10.80 0.17 1.00 10.63 11.8 11.8
12/17/2019 4649.70 4659.80 10.10 0.17 1.00 9.93 11.1 11.1 PIEDRA CHANCADA DE 3/4/muñani 4.4 Hr.
12/18/2019 4659.80 4669.70 9.90 0.17 1.00 9.73 10.9 10.9 PIEDRA CHANCADA DE 3/4/muñani 6 Hr.
12/19/2019 4669.70 4679.80 10.10 0.17 1.00 9.93 11.1 11.1
12/20/2019 4679.80 4689.90 10.10 0.17 1.00 9.93 11.1 11.1
12/21/2019 4689.90 4699.80 9.90 0.17 1.00 9.73 10.9 10.9
12/22/2019 4699.80 4699.80 0.00 0.17 1.00 -0.17 1.0 1.0
12/23/2019 4699.80 4709.00 9.20 0.17 1.00 9.03 10.2 10.2
12/24/2019 4709.00 4720.00 11.00 0.17 1.00 10.83 12.0 12.0
12/25/2019 4720.00 4720.00 0.00 0.00 0.0 0.0
12/26/2019 4720.00 4730.20 10.20 0.17 1.00 10.03 11.2 11.2
12/27/2019 4730.20 4740.50 10.30 0.17 1.00 10.13 11.3 11.3
12/28/2019 4740.50 4750.90 10.40 0.17 1.00 10.23 11.4 11.4
12/29/2019 4750.90 4750.90 0.00 0.00 0.0 0.0
12/30/2019 4750.90 4760.80 9.90 0.17 1.00 9.73 10.9 10.9
1170-023 288.34 4.76 0.00 0.00 0.00 28.00 0.00 283.58 316.34 316.34
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO CAMION ORMIGUERO / MIXER


U.A 1820-001 Operador: HONORATO PALOMINO

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/30/2019 102.00 112.00 10.00 0.17 9.83 10.0 10.0
12/1/2019 112.00 112.00 0.00 0.00 0.0 0.0
12/2/2019 112.00 122.00 10.00 0.17 9.83 10.0 10.0
12/3/2019 122.00 131.00 9.00 0.17 8.83 9.0 9.0
12/4/2019 131.00 141.00 10.00 0.17 9.83 10.0 10.0
12/5/2019 141.00 150.20 9.20 0.17 9.03 9.2 9.2
12/6/2019 150.20 162.30 12.10 0.17 11.93 12.1 12.1
12/7/2019 162.30 172.80 10.50 0.17 10.33 10.5 10.5
12/8/2019 172.80 172.80 0.00 0.00 0.0 0.0
12/9/2019 172.80 181.90 9.10 0.17 8.93 9.1 9.1
12/10/2019 181.90 192.30 10.40 0.17 10.23 10.4 10.4
12/11/2019 192.30 203.00 10.70 0.17 10.53 10.7 10.7
12/12/2019 203.00 213.50 10.50 0.17 10.33 10.5 10.5
12/13/2019 213.50 223.40 9.90 0.17 9.73 9.9 9.9
12/14/2019 223.40 232.50 9.10 0.17 8.93 9.1 9.1
12/15/2019 232.50 232.50 0.00 0.00 0.0 0.0
12/16/2019 232.50 243.80 11.30 0.17 11.13 11.3 11.3
12/17/2019 243.80 253.90 10.10 0.17 9.93 10.1 10.1
12/18/2019 253.90 263.70 9.80 0.17 9.63 9.8 9.8
12/19/2019 263.70 273.80 10.10 0.17 9.93 10.1 10.1
12/20/2019 273.80 283.90 10.10 0.17 9.93 10.1 10.1
12/21/2019 283.90 290.00 6.10 0.17 5.93 6.1 6.1
12/22/2019 290.00 290.00 0.00 0.00 0.0 0.0
12/23/2019 290.00 300.10 10.10 0.17 9.93 10.1 10.1
12/24/2019 300.10 311.20 11.10 0.17 10.93 11.1 11.1
12/25/2019 311.20 311.20 0.00 0.00 0.0 0.0
12/26/2019 311.20 320.00 8.80 0.17 8.63 8.8 8.8
12/27/2019 320.00 330.40 10.40 0.17 10.23 10.4 10.4
12/28/2019 330.40 341.00 10.60 0.17 10.43 10.6 10.6
12/29/2019 341.00 341.00 0.00 0.00 0.0 0.0
12/30/2019 341.00 350.70 9.70 0.17 9.53 9.7 9.7
1820-001 248.70 4.25 0.00 0.00 0.00 - 0.00 244.45 248.70 248.70
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO CAMION ORMIGUERO / MIXER


U.A 1820-003 Operador: WILAR CONDORI SIRENA

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/30/2019 46830.60 46840.00 9.40 0.17 1.00 9.23 10.4 10.4
12/1/2019 46840.00 46840.00 0.00 0.00 0.0 0.0
12/2/2019 46840.00 46850.00 10.00 0.17 1.00 9.83 11.0 11.0
12/3/2019 46850.00 46861.30 11.30 0.17 1.00 11.13 12.3 12.3
12/4/2019 46861.30 46871.30 10.00 0.17 1.00 9.83 11.0 11.0
12/5/2019 46871.30 46880.30 9.00 0.17 1.00 8.83 10.0 10.0
12/6/2019 46880.30 46890.20 9.90 0.17 1.00 9.73 10.9 10.9
12/7/2019 46890.20 46900.00 9.80 0.17 1.00 9.63 10.8 10.8
12/8/2019 46900.00 46900.00 0.00 0.00 0.0 0.0
12/9/2019 46900.00 46911.20 11.20 0.17 1.00 11.03 12.2 12.2
12/10/2019 46911.20 46920.70 9.50 0.17 1.00 9.33 10.5 10.5
12/11/2019 46920.70 46930.40 9.70 0.17 1.00 9.53 10.7 10.7
12/12/2019 46930.60 46940.60 10.00 0.17 1.00 9.83 11.0 11.0
12/13/2019 46940.60 46951.30 10.70 0.17 1.00 10.53 11.7 11.7
12/14/2019 46951.30 46960.70 9.40 0.17 1.00 9.23 10.4 10.4
12/15/2019 46960.70 46960.70 0.00 0.00 0.0 0.0
12/16/2019 46960.70 46970.20 9.50 0.17 1.00 9.33 10.5 10.5
12/17/2019 46970.20 46981.60 11.40 0.17 1.00 11.23 12.4 12.4
12/18/2019 46981.60 46990.20 8.60 0.17 1.00 8.43 9.6 9.6
12/19/2019 46975.70 46986.60 10.90 0.17 1.00 10.73 11.9 11.9
12/20/2019 46986.60 46996.30 9.70 0.17 1.00 9.53 10.7 10.7
12/21/2019 46996.30 47006.90 10.60 0.17 1.00 10.43 11.6 11.6
12/22/2019 47006.90 47006.90 0.00 0.00 0.0 0.0
12/23/2019 47006.90 47017.80 10.90 0.17 1.00 10.73 11.9 11.9
12/24/2019 47017.80 47027.50 9.70 0.17 1.00 9.53 10.7 10.7
12/25/2019 47027.50 47027.50 0.00 0.00 0.0 0.0
12/26/2019 47027.50 47037.00 9.50 0.17 1.00 9.33 10.5 10.5
12/27/2019 47037.00 47047.00 10.00 0.17 1.00 9.83 11.0 11.0
12/28/2019 47047.00 47056.00 9.00 0.17 1.00 8.83 10.0 10.0
12/29/2019 47056.00 47056.00 0.00 0.00 0.0 0.0
12/30/2019 47056.00 47066.00 10.00 0.17 1.00 9.83 11.0 11.0
1820-003 249.70 4.25 0.00 0.00 0.00 25.00 0.00 245.45 274.70 274.70
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Cisterna de Combustible Z6E-838


U.A 1860-001 Operador: MARTIN PALOMINO MAMANI

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs Previstas
FECHA Hr. In Hr. Fn OBSERVACION
12/1/2019 0.00 0.00 0.00 0.00 0.0 0.0
12/2/2019 150.00 161.20 11.20 11.20 11.2 11.2
12/3/2019 161.20 171.30 10.10 10.10 10.1 10.1
12/4/2019 171.30 181.50 10.20 10.20 10.2 10.2
12/5/2019 181.50 190.50 9.00 9.00 9.0 9.0
12/6/2019 190.50 200.50 10.00 10.00 10.0 10.0
12/7/2019 200.50 210.00 9.50 9.50 9.5 9.5
12/8/2019 210.00 210.00 0.00 0.00 0.0 0.0
12/9/2019 210.00 220.40 10.40 10.40 10.4 10.4
12/10/2019 220.40 230.60 10.20 10.20 10.2 10.2
12/11/2019 230.60 240.10 9.50 9.50 9.5 9.5
12/12/2019 240.10 251.40 11.30 11.30 11.3 11.3
12/13/2019 251.40 262.40 11.00 11.00 11.0 11.0
12/14/2019 262.40 270.90 8.50 8.50 8.5 8.5
12/15/2019 270.90 270.90 0.00 0.00 0.0 0.0
12/16/2019 270.90 280.00 9.10 9.10 9.1 9.1
12/17/2019 280.00 291.60 11.60 11.60 11.6 11.6
12/18/2019 291.60 301.30 9.70 9.70 9.7 9.7
12/19/2019 301.30 310.70 9.40 9.40 9.4 9.4
12/20/2019 310.70 320.80 10.10 10.10 10.1 10.1
12/21/2019 320.80 330.40 9.60 9.60 9.6 9.6
12/22/2019 330.40 330.40 0.00 0.00 0.0 0.0
12/23/2019 330.40 341.40 11.00 11.00 11.0 11.0
12/24/2019 341.40 351.20 9.80 9.80 9.8 9.8
12/25/2019 351.20 351.20 0.00 0.00 0.0 0.0
12/26/2019 351.20 361.00 9.80 9.80 9.8 9.8
12/27/2019 361.00 371.40 10.40 10.40 10.4 10.4
12/28/2019 371.40 382.00 10.60 10.60 10.6 10.6
12/29/2019 382.00 382.00 0.00 0.00 0.0 0.0
12/30/2019 382.00 391.40 9.40 9.40 9.4 9.4
12/31/2019 391.40 400.00 8.60 8.60 8.6 8.6
1860-001 250.00 0.00 0.00 0.00 0.00 - 0.00 250.00 250.00 250.00
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Camioneta Nissan


U.A 7230-002 Operador:

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
12/1/2019 0.00 0.00 0.00 0.00 0.0 0.0
12/2/2019 1.00 2.00 1.00 1.00 1.0 1.0
12/3/2019 2.00 3.00 1.00 1.00 1.0 1.0
12/4/2019 3.00 4.00 1.00 1.00 1.0 1.0
12/5/2019 4.00 5.00 1.00 1.00 1.0 1.0
12/6/2019 5.00 6.00 1.00 1.00 1.0 1.0
12/7/2019 6.00 7.00 1.00 1.00 1.0 1.0
12/8/2019 7.00 7.00 0.00 0.00 0.0 0.0
12/9/2019 7.00 8.00 1.00 1.00 1.0 1.0
12/10/2019 8.00 9.00 1.00 1.00 1.0 1.0
12/11/2019 9.00 10.00 1.00 1.00 1.0 1.0
12/12/2019 10.00 11.00 1.00 1.00 1.0 1.0
12/13/2019 11.00 12.00 1.00 1.00 1.0 1.0
12/14/2019 12.00 13.00 1.00 1.00 1.0 1.0
12/15/2019 13.00 13.00 0.00 0.00 0.0 0.0
12/16/2019 13.00 14.00 1.00 1.00 1.0 1.0
12/17/2019 14.00 15.00 1.00 1.00 1.0 1.0
12/18/2019 15.00 16.00 1.00 1.00 1.0 1.0
12/19/2019 16.00 17.00 1.00 1.00 1.0 1.0
12/20/2019 17.00 18.00 1.00 1.00 1.0 1.0
12/21/2019 18.00 19.00 1.00 1.00 1.0 1.0
12/22/2019 19.00 20.00 1.00 1.00 1.0 1.0
12/23/2019 20.00 21.00 1.00 1.00 1.0 1.0
12/24/2019 21.00 22.00 1.00 1.00 1.0 1.0
12/25/2019 22.00 22.00 0.00 0.00 0.0 0.0
12/26/2019 22.00 23.00 1.00 1.00 1.0 1.0
12/27/2019 23.00 24.00 1.00 1.00 1.0 1.0
12/28/2019 24.00 25.00 1.00 1.00 1.0 1.0
12/29/2019 25.00 25.00 0.00 0.00 0.0 0.0
12/30/2019 25.00 26.00 1.00 1.00 1.0 1.0
12/31/2019 26.00 27.00 1.00 1.00 1.0 1.0
7230-002 26.00 0.00 0.00 0.00 0.00 0.00 0.00 26.00 26.00 26.00
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos

CONTROL DE PRODUCCION DE EQUIPOS


EQUIPO Camioneta Toyota Doble Cabina 4x4
U.A 7230-008 Operador: RAIMUNDO PALOMINO HANCCO

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
12/1/2019 0.00 0.00 0.00 0.00 0.0 0.0
12/2/2019 1.00 2.00 1.00 1.00 1.0 1.0
12/3/2019 2.00 3.00 1.00 1.00 1.0 1.0
12/4/2019 3.00 4.00 1.00 1.00 1.0 1.0
12/5/2019 4.00 5.00 1.00 1.00 1.0 1.0
12/6/2019 5.00 6.00 1.00 1.00 1.0 1.0
12/7/2019 6.00 7.00 1.00 1.00 1.0 1.0
12/8/2019 7.00 7.00 0.00 0.00 0.0 0.0
12/9/2019 7.00 8.00 1.00 1.00 1.0 1.0
12/10/2019 8.00 9.00 1.00 1.00 1.0 1.0
12/11/2019 9.00 10.00 1.00 1.00 1.0 1.0
12/12/2019 10.00 11.00 1.00 1.00 1.0 1.0
12/13/2019 11.00 12.00 1.00 1.00 1.0 1.0
12/14/2019 12.00 13.00 1.00 1.00 1.0 1.0
12/15/2019 13.00 13.00 0.00 0.00 0.0 0.0
12/16/2019 13.00 14.00 1.00 1.00 1.0 1.0
12/17/2019 14.00 15.00 1.00 1.00 1.0 1.0
12/18/2019 15.00 16.00 1.00 1.00 1.0 1.0
12/19/2019 16.00 17.00 1.00 1.00 1.0 1.0
12/20/2019 17.00 18.00 1.00 1.00 1.0 1.0
12/21/2019 18.00 19.00 1.00 1.00 1.0 1.0
12/22/2019 19.00 20.00 1.00 1.00 1.0 1.0
12/23/2019 20.00 21.00 1.00 1.00 1.0 1.0
12/24/2019 21.00 22.00 1.00 1.00 1.0 1.0
12/25/2019 22.00 22.00 0.00 0.00 0.0 0.0
12/26/2019 22.00 23.00 1.00 1.00 1.0 1.0
12/27/2019 23.00 24.00 1.00 1.00 1.0 1.0
12/28/2019 24.00 25.00 1.00 1.00 1.0 1.0
12/29/2019 25.00 25.00 0.00 0.00 0.0 0.0
12/30/2019 25.00 26.00 1.00 1.00 1.0 1.0
12/31/2019 26.00 27.00 1.00 1.00 1.0 1.0
7230-008 26.00 0.00 0.00 0.00 0.00 0.00 0.00 26.00 26.00 26.00
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos

CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Comprensora de Aire


U.A 8110-002 Operador: Wilson Condori Mamani

Diferencia Arran. Ini. Mantto. F.Frente Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs
FECHA Hr. In Hr. Fn OBSERVACION
Previstas
11/29/2019 841.00 848.70 7.70 1.00 7.70 8.7 8.7
11/30/2019 842.00 848.70 6.70 1.00 6.70 7.7 7.7
12/1/2019 848.70 848.70 0.00 0.00 0.0 0.0
12/2/2019 848.70 854.00 5.30 1.00 5.30 6.3 6.3
12/3/2019 854.00 855.90 1.90 1.00 1.90 2.9 2.9
12/4/2019 855.90 860.20 4.30 1.00 4.30 5.3 5.3
12/5/2019 860.20 864.10 3.90 1.00 3.90 4.9 4.9
12/6/2019 864.10 869.30 5.20 1.00 5.20 6.2 6.2
12/7/2019 869.30 873.40 4.10 1.00 4.10 5.1 5.1
12/8/2019 873.40 873.40 0.00 0.00 0.0 0.0
12/9/2019 873.40 877.50 4.10 1.00 4.10 5.1 5.1
12/10/2019 877.50 880.90 3.40 1.00 3.40 4.4 4.4
12/11/2019 880.90 885.10 4.20 1.00 4.20 5.2 5.2
12/12/2019 885.10 889.00 3.90 1.00 3.90 4.9 4.9
12/13/2019 889.00 893.40 4.40 1.00 4.40 5.4 5.4
12/14/2019 893.40 897.90 4.50 1.00 4.50 5.5 5.5
12/15/2019 897.90 897.90 0.00 0.00 0.0 0.0
12/16/2019 897.90 901.80 3.90 1.00 3.90 4.9 4.9
12/17/2019 901.80 907.70 5.90 1.00 5.90 6.9 6.9
12/18/2019 907.70 909.50 1.80 1.00 1.80 2.8 2.8
12/19/2019 909.50 911.30 1.80 1.00 1.80 2.8 2.8
12/20/2019 911.30 914.20 2.90 1.00 2.90 3.9 3.9
12/21/2019 914.20 917.50 3.30 1.00 3.30 4.3 4.3
12/22/2019 917.50 919.70 2.20 1.00 2.20 3.2 3.2
12/23/2019 919.70 925.00 5.30 5.30 5.3 5.3
12/24/2019 925.00 932.00 7.00 1.00 7.00 8.0 8.0
12/25/2019 932.00 932.00 0.00 0.00 0.0 0.0
12/26/2019 932.00 937.00 5.00 1.00 5.00 6.0 6.0
12/27/2019 937.00 946.70 9.70 1.00 9.70 10.7 10.7
12/28/2019 946.70 953.00 6.30 1.00 6.30 7.3 7.3
12/29/2019 953.00 953.00 0.00 0.00 0.0 0.0
8110-002 118.70 0.00 0.00 0.00 0.00 25.00 0.00 118.70 143.70 143.70
CONSTRUCTORA SURUPANA S.A.C.
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Excavadora CL
U.A 0330-002 Operador: RUFO FLORES CCAMA

Diferencia Arran. Ini. Mantto. F.Frente


FECHA Hr. In Hr. Fn
12/1/2019 4623.00 4623.00 0.00
12/2/2019 4623.00 4633.70 10.70
12/3/2019 4633.70 4644.20 10.50
12/4/2019 4644.20 4654.50 10.30
12/5/2019 4654.50 4665.10 10.60
12/6/2019 4665.10 4674.80 9.70
12/7/2019 4674.80 4683.90 9.10
12/8/2019 4683.90 4683.90 0.00
12/9/2019 4683.90 4692.40 8.50
12/10/2019 4692.40 4701.80 9.40
12/11/2019 4701.80 4710.90 9.10
12/12/2019 4710.90 4721.60 10.70
12/13/2019 4721.60 4731.80 10.20
12/14/2019 4731.80 4740.80 9.00
12/15/2019 4740.80 4740.80 0.00
12/16/2019 4740.80 4751.10 10.30
12/17/2019 4751.10 4760.70 9.60
12/18/2019 4760.70 4770.20 9.50
12/19/2019 4770.20 4780.30 10.10
12/20/2019 4780.30 4790.00 9.70
12/21/2019 4790.00 4800.40 10.40
12/22/2019 4800.40 4800.40 0.00
12/23/2019 4800.40 4810.50 10.10
12/24/2019 4810.50 4820.10 9.60
12/25/2019 4820.10 4820.10 0.00
12/26/2019 4820.10 4830.10 10.00
12/27/2019 4830.10 4840.20 10.10
12/28/2019 4840.20 4849.90 9.70
12/29/2019 4849.90 4849.90 0.00
12/30/2019 4849.90 4859.00 9.10
12/31/2019 4859.00 4869.10 10.10
0330-002 246.10 0.00 0.00 0.00
CION DE EQUIPOS

Lluvia Refrigerio Traslado Fren. Hrs. Trab Total Hrs


Previstas
0.00 0.0 0.0
10.70 10.7 10.7
10.50 10.5 10.5
10.30 10.3 10.3
10.60 10.6 10.6
9.70 9.7 9.7
9.10 9.1 9.1
0.00 0.0 0.0
8.50 8.5 8.5
9.40 9.4 9.4
9.10 9.1 9.1
10.70 10.7 10.7
10.20 10.2 10.2
9.00 9.0 9.0
0.00 0.0 0.0
10.30 10.3 10.3
9.60 9.6 9.6
9.50 9.5 9.5
10.10 10.1 10.1
9.70 9.7 9.7
10.40 10.4 10.4
0.00 0.0 0.0
10.10 10.1 10.1
9.60 9.6 9.6
0.00 0.0 0.0
10.00 10.0 10.0
10.10 10.1 10.1
9.70 9.7 9.7
0.00 0.0 0.0
9.10 9.1 9.1
10.10 10.1 10.1
0.00 0.00 0.00 246.10 246.10 246.10
OBSERVACION
CONSORCIO VIAL CHUPA
OBRA: TRAMO DE CARRETERA
Oficina Principal: AV. CIRCUNVALACION Nº 587 JULIACA - PUNO
Area: Division de Equipos
CONTROL DE PRODUCCION DE EQUIPOS

EQUIPO Rodillo Liso


U.A 0501-006 Operador: KEVIN CALCINA PERALTA

Diferencia Arran. Ini. Mantto. F.Frente Lluvia


FECHA Hr. In Hr. Fn

12/1/2019 0.00 0.00 0.00


12/2/2019 5680.00 5690.20 10.20
12/3/2019 5690.20 5700.00 9.80
12/4/2019 5700.00 5710.10 10.10
12/5/2019 5710.10 5719.70 9.60
12/6/2019 5719.70 5729.30 9.60
12/7/2019 5729.30 0.00 -5729.30
12/8/2019 0.00 0.00 0.00
12/9/2019 0.00 0.00 0.00
12/10/2019 0.00 0.00 0.00
12/11/2019 0.00 0.00 0.00
12/12/2019 0.00 0.00 0.00
12/13/2019 0.00 0.00 0.00
12/14/2019 0.00 0.00 0.00
12/15/2019 0.00 0.00 0.00
12/16/2019 0.00 0.00 0.00
12/17/2019 0.00 0.00 0.00
12/18/2019 0.00 0.00 0.00
12/19/2019 0.00 0.00 0.00
12/20/2019 0.00 0.00 0.00
12/21/2019 0.00 0.00 0.00
12/22/2019 0.00 0.00 0.00
12/23/2019 0.00 0.00 0.00
12/24/2019 0.00 0.00 0.00
12/25/2019 0.00 0.00 0.00
12/26/2019 0.00 0.00 0.00
12/27/2019 0.00 0.00 0.00
12/28/2019 0.00 0.00 0.00
12/29/2019 0.00 0.00 0.00
12/30/2019 0.00 0.00 0.00
12/31/2019 0.00 0.00 0.00
0501-006 -5680.00 0.00 0.00 0.00 0.00
Refrigerio Traslado Fren. Hrs. Trab Total Hrs Previstas

0.00 0.0 0.0


10.20 10.2 10.2
9.80 9.8 9.8
10.10 10.1 10.1
9.60 9.6 9.6
9.60 9.6 9.6
-5729.30 -5729.3 -5729.3
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.0 0.0
0.00 0.00 -5680.00 -5680.00 -5680.00
OBSERVACION