CALCULO DE MUROS DE GRAVEDAD

UBICACION : CIUDADELA LA PLAYA

FECHA: NOVIEMBRE/92

DATOS
qa = 10 t/m2 H = 3.50
fc = 210 Kg/cm2 B = 1.90 2
b = 0.30 Ph = Ka.Pes.H /2 = 3.471
b' = 0.80
Ka = 0.33 Mv = Ph H/3 = 4.049
Pes= 1.70
Peh= 2.20
FSD= 0.60 We/Ph = 1.876
- -------- ---------- - ----------- - ------- ----------- - FSV= Me/Mv = 2.947
| PESO | B.P | MOMENTOS |
| -------- ---------- | ----------- | ------- ----------- | MR = Me - Mv = 7.885
| W1 = 3.080 | 0.533 | 1.643 | X = MR/We = 0.727
| W2 = 2.310 | 0.950 | 2.195 | e = B/2 - X = 0.223
| W3 = 3.080 | 1.367 | 4.209 | B/3= B/3 = 0.633
| W4 = 2.380 | 1.633 | 3.887 | B/6= B/6 = 0.317
| -------- ---------- | ----------- | ------- ----------- |
| We = 10.850 | | Me = 11.934 | Si e<BB/6 q1= We/B (1+6e/B) < qa
- -------- ---------- - ----------- - ------- ----------- - Si e>B/6 q2=2We/(3L(b/2-e))< qa
q = q1 o q2 = 9.738
R esta en el tercio medio central

SE ACEPTA EL CALCULO :

Si FSD >= 1,5


Si FSD >= 1,5
Si qa >= q1 o q2

A = 3.85
CALCULO DE MUROS DE GRAVEDAD
UBICACION : PUENTE SAN MIGUEL
FECHA: MAYO/2012

0.20
α= 0 º

W3

4.00
Ph = Ka.Pes.H2 /2 = 7.897 W4 Relleno
W1
Mv = Ph H/3 = 13.688

/ / / / / W2
FSD= 0.60 We/Ph = 1.567

1.20
FSV= Me/Mv = 2.940
PESO B.P MOMENTOS W5

0.30
W1 = 2.352 1.150 2.705 MR = Me - Mv = 26.555
W2 = 1.764 1.350 2.381 X = MR/We = 1.288
W3 = 1.301 1.450 1.886 e = B/2 - X = 0.237 1.05 0.50 1.50
W4 = 13.010 2.300 29.922 B/3= B/3 = 1.017 51.80 cm
W5 = 2.196 1.525 3.349 B/6= B/6 = 0.508
DATOS:
We = 20.622 Me = 40.243 Si e<BB/6 q1= We/B (1+6e/B) < qa ƴs = 1.77 t/m3
Si e>B/6 q2=2We/(3L(b/2-e))< qa Ka = 0.33
q = q1 o q2 = 9.918 Suelo Tipo II
R esta en el tercio medio central 3.605
qa = 10 T/m2
SE ACEPTA EL CALCULO : f'c = 210 Kg/cm2
fy = 4200 Kg/cm2
Si FSD >=1.50 O.K Pe = 2.40 Kg/cm3
Si FSV >=1.50 O.K
Si qa >= q1 o q2
q1 O.K
q2 O.K
/ / / / / W2

1.20
DIMENSIONES DEL DIENTE NO ES NECESARIO W5

0.30
Kp = 10 Ka 3.300
Pp1= Kp H x Pes 7.009 Asumir este

0.30
Pp2= Kp Hd x Pes 8.762 valor

Pp = (Pp1+Pp2)/2 Hd 2.366 0.10

FSD = 0,60 We /(PH-Pp) 2.237

Si FSD >=1.50 O.K M = Hd2 (Pp1+2 Pp2)/6 =0.368


b = K2 (Mv/B)^0,5 10.00 cm
1.05
/
/

0.30
DISEÑO DEL DEDO /
/
7.745 t/m2
M = L2 (q1+2 q2)/6 = 5.068 t-m / m ### t/m2
Mu = 1,40 M 7.095 t-m / m

As min = 14/fy b d 8.333 cm2 / m As = 0,30 Mu / d 8.514 cm2 / m Poner As calculo

As inferior Seleccionar uno de ellos


ɵ = 12 mm S= 13 cm
ɵ = 14 mm S= 18 cm
ɵ = 16 mm S= 24 cm
Nota: Máximo S de refuerzo = altura efectiva (d 25 cm

### t/m2
1.50
DISEÑO DEL TALON \
\

0.30
\
\

As min = 14/fy b d 8.333 cm2 / m M = q L2 / 2 - L2 (q1+2 q2) / 6 = 4.537 t-m / m


Mu = 1,40 M 6.352 t-m / m ### t/m2
As Superior ### t/m2

As = 0,30 Mu / d 7.623 cm2 / m Poner As min


Seleccionar uno de ellos
ɵ = 12 mm S= 14 cm
ɵ = 14 mm S= 18 cm
ɵ = 16 mm S= 24 cm
DISEÑO DE LA PANTALLA
0.20
H M Mu d As ɵ S
FRANJA As min As a colocar
(m) ( t-m /m ) 1,4 M ( m) cm2/m (mm) ( cm )

1 = H/3
1 1.63 0.4242 0.594 0.25 0.713 8.33 8.33 18 31

1.63
2 3.27 3.3935 4.751 0.35 4.072 11.67 11.67 16 60
3 4.90 11.4531 ### 0.45 10.69 15.00 15.00 16 60

4.00

2 = H/3
1.63
3 = H/3
1.63
1.20
/ / / / / PH = Kh x Pes x h

0.30
1.05 0.50 1.50
CALCULO DE MUROS DE GRAVEDAD
UBICACION : PUENTE SAN MIGUEL
FECHA: MAYO/2012

0.20

0.50
W3

4.00
Agua

Ph = Ka.Pes.H /2 = 7.897
2

4.40

4.40
W1
Mv = Ph H/3 = 13.688

W2
FSD= 0.60 We/Ph = 1.567

1.20
FSV= Me/Mv = 2.940
PESO B.P MOMENTOS W5

0.30
W1 = 2.352 1.150 2.705 MR = Me - Mv = 26.555
W2 = 1.764 1.350 2.381 X = MR/We = 1.288
W3 = 1.301 1.450 1.886 e = B/2 - X = 0.237
W4 = 13.010 2.300 29.922 B/3= B/3 = 1.017 1.05 0.50 1.50
W5 = 2.196 1.525 3.349 B/6= B/6 = 0.508 51.80 cm
DATOS:
We = 20.622 Me = 40.243 Si e<BB/6 q1= We/B (1+6e/B) < qa ƴs = = 1.77 t/m3
Si e>B/6 q2=2We/(3L(b/2-e))< qa Ka = 0.33
q = q1 o q2 = 9.918 Suelo Tipo II
R esta en el tercio medio central 3.605
qa = 10 T/m2
SE ACEPTA EL CALCULO : f'c = 210 Kg/cm2
fy = 4200 Kg/cm2
Si FSD >=1.50 O.K Peh = 2.40 Kg/cm3
Si FSV >=1.50 O.K
Si qa >= q1 o q2
q1 O.K
q2 O.K
/ / / / / W2

1.20
DIMENSIONES DEL DIENTE NO ES NECESARIO W5

0.30
Kp = 10 Ka 3.300
Pp1= Kp H x Pes 7.009
Pp2= Kp Hd x Pes 8.762

Pp = (Pp1+Pp2)/2 Hd 2.366

FSD = 0,60 We /(PH-Pp) 2.237

Si FSD >=1.50 O.K M = Hd2 (Pp1+2 Pp2)/6 =0.368


b = K2 (Mv/B)^0,5 10.00 cm
1.05
/
/

0.30
DISEÑO DEL DEDO /
/
7.745
M = L2 (q1+2 q2)/6 = 5.068 t-m / m ### t/m2
Mu = 1,40 M 7.095 t-m / m

As min = 14/fy b d 8.333 cm2 / m As = 0,30 Mu / d 8.514 cm2 / m Poner As calculo

As inferior Seleccionar uno de ellos


ɵ = 12 mm S= 13 cm
ɵ = 14 mm S= 18 cm
ɵ = 16 mm S= 24 cm
Nota: Máximo S de refuerzo = altura efectiva (d 25 cm

###
1.50
DISEÑO DEL TALON \
\

0.30
\
\

As min = 14/fy b d 8.333 cm2 / m M = q L2 / 2 - L2 (q1+2 q2) / 6 = 4.537 t-m / m


Mu = 1,40 M 6.352 t-m / m ###
As Superior ### t/m2

As = 0,30 Mu / d 7.623 cm2 / m Poner As min


Seleccionar uno de ellos
ɵ = 12 mm S= 14 cm
ɵ = 14 mm S= 18 cm
ɵ = 16 mm S= 24 cm
DISEÑO DE LA PANTALLA
0.20
H M Mu d As ɵ S
FRANJA As min As a colocar
(m) ( t-m /m ) 1,4 M ( m) cm2/m (mm) ( cm )

1 = H/3
1 1.63 0.4242 0.594 0.25 0.713 8.33 8.33 18 31

1.63
2 3.27 3.3935 4.751 0.35 4.072 11.67 11.67 16 60
3 4.90 11.4531 ### 0.45 10.69 15.00 15.00 16 60

4.00

2 = H/3

1.63
3 = H/3

1.63
1.20
/ / / / /

0.30
1.05 0.50 1.50
α=

W4 Relleno

1.50
cm
Asumir este
0.30

valor

t/m2

t/m2
t/m2

PH = Kh x Pes x h

1.50
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD 22.00m No carrilles= 1 U
ANCHO TOTAL 5.00m (Ancho de via+Veredas)
FECHA =ABR 2015

H/24>=0.3m =0.33m 3/8 hv= 0.58m

### 0.60m

hv=1.10(0.15+L/18)= ###
###
###
###
###

###
###

###

###

###

2.40m 0.90m 1.70m


/12=

5.00m

3.90m - ### ### - ### ###


H/2-2H/3 H/8 - H/10 B/3
Dato
Asumir
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 22.00m
ANCHO TOTAL 5.00m (Ancho de via+Veredas)
FECHA =MARZO 2015

DATOS:
ɣhormigón = 2.40 T/m3
ɣm = 1.80 T/m3 ɸ = 30°

a) MUERTA INFRAESTRUCTURA
### 0.60m

###
P5

###
P6
P4
###

P7
###

P8

P3
###

P2
###

P1

A
2.40m 0.90m 1.70m

5.00m
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 22.00m
ANCHO TOTAL 5.00m (Ancho de via+Veredas)
FECHA =MARZO 2015

DATOS:
ɣh.a = 2.40 T/m3
ɣh.s = 2.20 T/m3
N de vig = 2 U

b) CARGA MUERTA SUPER-ESTRUCTURA (D)


Posición para determinar Factor de Rueda

b=1.30m 1.20m 1.80m

1.250m S=2.500m 2.500m


0.700m
0

###
0

0.750m

0.850m ### ### ### 1.70m ### ### ###

1.050m 2.100m 2.100m

Ancho del tabl = 5.000m Ok

Element Superestructura
Volumen WS YA MDSA
Capa de rodadura ### 0.385T/m 1.575m 0.606T-m
Aceras ### 0.870T/m 1.675m 1.457T-m
Tablero (Losa) ### 1.601T/m 1.435m 2.297T-m ### ###
Volados ### 0.938T/m 1.435m 1.347T-m
Vigas ### 2.534T/m 0.660m 1.673T-m
Cartelas ### 0.096T/m 1.287m 0.124T-m
6.425T/m 7.504T-m
Diafragmas Espesor Volumen P
Diafragma de apoyo 0.250m ### 6.60Ton
Diafragma central 0.250m ### 2.32Ton
8.92Ton

D = 16.30Ton
XA = 2.000m
MAD= 32.61T-m

c) CARGA VIVA SUPER-ESTRUCTURA (L)

Cortante: Momento:
Fr= P (1 + (a+b)/= 1.80 P Fr = S/1.80 = 1.39 P

Rd=5.00 T
Rt=7.50 T

Rt=7.50 T

4.00m 4.00m

14.00m

RL = 24.60Ton
XA = 2.000m
MAL= 49.20T-m

d) FLOTACION (B)

ɣagua = 1.00 T/m3

### 0.60m
###
h' =
###

P5
###

P6
P4
###
###
###
P7

### P8

0.145m P3

###

Nivel aguas freáticas


###
P2

###
P1

A
2.40m 0.90m 1.70m

5.00m

Element Volumen W XA MBA


Cimiento ### 3.000T/m 2.500m 7.500T-m
Sobrecimiento ### 1.440T/m 2.000m 2.880T-m
### 0.534T/m 2.497m 1.334T-m
4.974T/m 11.714T-m

MBA= 11.71T-m

e) VIENTO (W)

e.1) Carga Muerta

Coef. Vie = ### T/m2

Longitud ###
Altura = 1.800m

WD = ###

Viento W YA MWDA
Viga+tablero+acera 0.455T/m 6.850m 3.114T-m
3.114T-m

e.2) Carga Viva


WL = ### YA = 9.630m

MWLA = 26.117T-m

f) FUERZA LONGITUDINAL (LF)

No carril = 1 U
% C. viva= 5%

FL = ### YA = 9.630m

MFLA = 1.296T-m

g) EMPUJE DE TIERRAS (Et)

h' = 0.600m
ɸ = 30° Ka = Tan2 (45-ɸ/2) Kp = 1/Ka
ɣm = 1.80 T/m3 Ka = 0.333 Kp = 3

E = 1/2 ɣs Ka H (H+2 h')= ###

H ( H + 3 h' )
Y = 3 ( H + 2 h' ) = 2.773m

MEtA = 58.406T-m

h) FUERZA DE SISMO (EQ)

h.1) Infraestructura (I)

Datos: Obtenidos de a) Carga Muerta

Carga (P = ###
MYA = ###

EQI = (0.04 - 0.06) P= 0.04 P = ###

Y = MYA / P = 3.53m

MEQIA = 7.228T-m

h.2) Super-estructura (S)

Datos: Obtenidos de b) Carga Muerta Super-estructura

WS = 6.425T/m
MDSA = 7.504T-m
D = ###

Peso de Super-estrcutu 163.04Ton

EQS = (0.04 - 0.06) P= 0.04 P = ###


Y = MYA / P = 1.17m

YS = ( H - hviga) + = 7.42m

MEQSA= 9.676T-m
rminar Factor de Rueda

1.80m ###

2.500m
###
###
###

###
###

###

2.100m

###
PROYECTO: PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES

RESUMEN DE SOLICITACIONES
No TIPO SIMBOLO SENTIDO CARGA SIMBOLO MOMENTO
1 Muerta Superestructura D ### MAD 32.608T-m
2 Viva Superestructura L ### MAL 49.202T-m
3 Flotación B 4.974Ton MBA 11.714T-m
4 Viento D WD 0.455Ton MWDA 3.114T-m
5 Viento L WL 2.712Ton MWLA 26.117T-m
6 Fuerza Longitud. LF 0.135Ton MFAL 1.296T-m
7 Empuje de tierra Et ### MEtA 58.406T-m
8 Sismo Infraestructura EQI 2.047Ton MEQIA 7.228T-m
9 Sismo Superestructura EQS 1.304Ton MEQSA 9.676T-m
10 Muerta Infraestructura P ### MPXA ###

ANALISIS DE ESTABILIDAD

FUERZAS RESISTENTES (Ton)


No
COMBINACION D L B WD WL
1 GI: Estribo sin cargas 4.974Ton
2 GI: Estribo con cargas ### ### 4.974Ton
3 GII: Estribo cargado 125% ### 4.974Ton 0.455Ton
4 GIII: Estribo cargado (0.3W ### ### 4.974Ton 0.136Ton 2.712Ton
5 GVII: Estribo cargado 133% ### 4.974Ton

MOMENTOS RESISTENTES (T-M)


No
COMBINACION D L B WD WL
1 GI: Estribo sin cargas ###
2 GI: Estribo con cargas ### ### ###
3 GII: Estribo cargado 125% ### ### 3.114T-m
4 GIII: Estribo cargado (0.3W ### ### ### 0.934T-m 26.117T-m
5 GVII: Estribo cargado 133% ### ###

a entre este rango


No COMBINACION a L/1.5≥ ≥L/3 L Ϭmáx
1 GI: Estribo sin cargas 2.03m OK OK 5.00m 14.42T/m2
2 GI: Estribo con cargas 2.02m OK OK 5.00m 27.51T/m2
3 GII: Estribo cargado 125% 1.97m OK OK 5.00m 16.31T/m2
4 GIII: Estribo cargado (0.3W 1.69m OK OK 5.00m 27.45T/m2
5 GVII: Estribo cargado 133% 1.75m OK OK 5.00m 17.81T/m2

1 GI: (D + L + E + B + SF + CF) 100% L=0, SF=0, CF=0 31.777843


2 GI: (D + L + E + B + SF + CF) 100% SF=0, CF=0
3 GII: (D + E + B + SF + W) 125% SF=0
4 GII: (D + L + E + B + SF + CF + 0.3 SF=0, CF=0
5 GVII: (D + E + B + SF + EQ) 133% SF=0
ON CHILLANES

ZAS RESISTENTES (Ton)


LF Et EQI EQS P nΣF nΣF
21.060Ton 51.170Ton 46.195Ton 21.060Ton
21.060Ton 51.170Ton 87.101Ton 21.060Ton
21.060Ton 51.170Ton 62.500Ton 21.515Ton
0.135Ton 21.060Ton 51.170Ton 87.101Ton 24.043Ton
21.060Ton ### 1.304Ton 51.170Ton 62.500Ton 24.411Ton

NTOS RESISTENTES (T-M)


LF Et EQI EQS P nΣM nΣM
58.406T-m ### 152.32T-m 58.406T-m
58.406T-m ### 234.13T-m 58.406T-m
58.406T-m ### 184.93T-m 61.520T-m
1.296T-m 58.406T-m ### 234.13T-m 86.753T-m
58.406T-m ### 9.676T-m ### 184.93T-m 75.310T-m

CUMPLIMIENTO
Ϭmin FV FD FV FD OBSERVACION
4.06T/m2 2.608 1.097 OK Poner espol Base estribo
7.33T/m2 4.009 2.068 OK OK
3.69T/m2 3.006 1.452 OK Poner espolon
0.42T/m2 2.699 1.811 OK OK
0.98T/m2 2.456 1.280 OK Poner espolonBase estribo
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 22.00m
ANCHO TOTAL 5.00m (Ancho de via+Veredas)
FECHA =MARZO 2015

DISEÑO DE LA PANTALLA

DATOS:
h' = 0.600m f'c = 280 Kg/cm2 fy = 4200 Kg/cm2
ɸ = 30° Ka = Tan2 (45-ɸ/2) Kp = 1/Ka
ɣm = 1.80 T/m3 Ka = 0.333 Kp = 3
Re = ###
E = 1/2 ɣs Ka H (H+2 h')= ###

H ( H + 3 h' )
Y = 3 ( H + 2 h' ) = 2.571m

### 0.60m

###
h' =
1ɸ16mm@25cm 1ɸ16mm@2

Hv = H viga
###

###
(4)
###

###
###

###

(3)
###

###

0.629m
###

1ɸ14mm@12.5cm
###

(2)
###

0.694m
1ɸ18mm@12.5cm
###

1ɸ14mm@10cm
1ɸ25mm@25cm (1)
###

1ɸ16mm@20cm
###

2.40m 0.90m 1.70m


5.00m

ARMADURA EN LA PANTALLA
H Y M Mu d K As As min
FRANJA ϼ As colocar
(m) (m) ( t-m /m ) 1.60 M ( m) (Kg/cm ) 2
cm2/m
1 7.20m 2.571m ### ### 0.830m 10.836m 0.0031 25.92cm2 27.67 27.67
2 4.00m 1.49m 9.280T-m ### 0.624m 3.819m 0.0011 6.75cm2 20.78 20.78
3 3.00m 1.14m 4.320T-m 6.912T-m 0.559m 2.212m 0.0006 3.49cm2 18.63 18.63
4 1.55m 0.63m 0.805T-m 1.288T-m 0.230m 2.434m 0.0007 1.58cm2 7.67 7.67

ARMADURA DE DISTRIBUCION (LADO SIN RELLENO)


H Y M Mu d K As As min
EJE ϼ norma As colocar
(m) (m) ( t-m /m ) 1.60 M ( m) (Kg/cm2) cm2/m
Lado relleno 0.900m 0.000m 0.0016 14.40cm2 0.00 14.40

ARMADURA DE DISTRIBUCION
H Y M Mu d K As As min
EJE ϼ norma As colocar
(m) (m) ( t-m /m ) 1.60 M ( m) (Kg/cm2) cm2/m
2 lados 0.668m 0.000m 0.0012 10.80cm2 0.00 10.80

DISEÑO DEL DEDO

E = 1/2 ɣs Ka H (H+2 =
h') ###

Para GI: Cargado nΣM = ###


nΣM = 58.406T-m
nΣF = 87.101T-m

Mr = Me - = ###
X = Mr/nΣF = 2.017m
e = B/2 - X = 0.483m
Si e<B/6 q1= nΣF/B (1+6e/B) < = ###
Si e>B/6 q2=2nΣF/(3L(b/2-e))< = 7.33T/m2

1ɸ22mm@10cm
###

2.40m 0.90m 1.70m

5.00m
###

###

###

###
###

###

###

###
=
M = L2 (q1+2 q2)/6 ###

ARMADURA DEL DEDO (CONTACTO CON AGUA)


M Mu d K As As min ɵ S calculo S asumidoAs colocado
ϼ As colocar
( t-m / m ) 1.60 M ( m) (Kg/cm )2
cm2/m (mm) ( cm ) ( cm ) ( cm
### ### 0.530m 20.758m 0.0061 32.55cm2 17.67 32.55 22mm 12cm 10cm 38.013

DISEÑO DEL TALON

12.96T/m2
###

2.40m 0.90m 1.70m


1ɸ16mm@10cm
5.00m
###

###

###

###

M = q L2 / 2 - L2 (q1+2 q2) / 6

ARMADURA DEL TALON (CONTACTO CON RELLENO)


M Mu d K As As min ɵ S calculo S asumidoAs colocado
ϼ As colocar
( t-m / m ) 1.60 M ( m) (Kg/cm )2
cm2/m (mm) ( cm ) ( cm ) ( cm
6.909T-m ### 0.530m 3.936m 0.0011 5.91cm2 17.67 17.67 16mm 11cm 10cm 20.106
ARMADURA DE DISTRIBUCION

d K As As min ɵ S calculo S asumidoAs colocado


ϼ norma As colocar
( m) (Kg/cm )
2
cm2/m (mm) ( cm ) ( cm ) ( cm2 )
0.600m 0.000m 0.0012 7.20cm2 7.20 12mm 16cm 15cm 7.540 OK

1ɸ22mm@10cm

1ɸ12mm@15cm 1ɸ16mm@10cm
ɵ S calculo S asumidoAs colocado
(mm) ( cm ) ( cm ) ( cm2 )
14mm 6cm 12.5cm 52.308 OK 47.11%
18mm 12cm 12.5cm 20.358 REDISTIBUIR
25mm 26cm 25cm 19.635 OK
16mm 26cm 25cm 8.042 OK

LENO)
ɵ S calculo S asumidoAs colocado
(mm) ( cm ) ( cm ) ( cm2 )
14mm 11cm 10cm 15.394 OK 6.46%

ɵ S calculo S asumidoAs colocado


(mm) ( cm ) ( cm ) ( cm2 )
16mm 19cm 20cm 10.053 REDISTIBUIR -7.43%
As colocado
( cm2 )
38.013 OK 14.37%

As colocado
( cm2 )
20.106 OK 12.13%
4.51%
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 22.00m
ANCHO TOTAL 5.00m (Ancho de via+Veredas)
FECHA =MARZO 2015

ARMADO DEL ESTRIBO

### 0.60m

1ɸ16mm@25cm 1ɸ16mm@2

###
###
###
###

0.600m
1ɸ16mm@20cm
1ɸ14mm@12.5cm
###

0.600m
1ɸ18mm@12.5cm
###

1ɸ14mm@10cm
1ɸ25mm@25cm

1ɸ22mm@10cm
###

1ɸ12mm@15cm 1ɸ16mm@10cm

2.40m 0.90m 1.70m

5.00m