Cal Estribo Pte La Angelica L 20m
Cal Estribo Pte La Angelica L 20m
FECHA: NOVIEMBRE/92
DATOS
qa = 10 t/m2 H = 3.50
fc = 210 Kg/cm2 B = 1.90 2
b = 0.30 Ph = Ka.Pes.H /2 = 3.471
b' = 0.80
Ka = 0.33 Mv = Ph H/3 = 4.049
Pes= 1.70
Peh= 2.20
FSD= 0.60 We/Ph = 1.876
- -------- ---------- - ----------- - ------- ----------- - FSV= Me/Mv = 2.947
| PESO | B.P | MOMENTOS |
| -------- ---------- | ----------- | ------- ----------- | MR = Me - Mv = 7.885
| W1 = 3.080 | 0.533 | 1.643 | X = MR/We = 0.727
| W2 = 2.310 | 0.950 | 2.195 | e = B/2 - X = 0.223
| W3 = 3.080 | 1.367 | 4.209 | B/3= B/3 = 0.633
| W4 = 2.380 | 1.633 | 3.887 | B/6= B/6 = 0.317
| -------- ---------- | ----------- | ------- ----------- |
| We = 10.850 | | Me = 11.934 | Si e<BB/6 q1= We/B (1+6e/B) < qa
- -------- ---------- - ----------- - ------- ----------- - Si e>B/6 q2=2We/(3L(b/2-e))< qa
q = q1 o q2 = 9.738
R esta en el tercio medio central
SE ACEPTA EL CALCULO :
A = 3.85
CALCULO DE MUROS DE GRAVEDAD
UBICACION : PUENTE SAN MIGUEL
FECHA: MAYO/2012
0.20
α= 0 º
W3
4.00
Ph = Ka.Pes.H2 /2 = 7.897 W4 Relleno
W1
Mv = Ph H/3 = 13.688
/ / / / / W2
FSD= 0.60 We/Ph = 1.567
1.20
FSV= Me/Mv = 2.940
PESO B.P MOMENTOS W5
0.30
W1 = 2.352 1.150 2.705 MR = Me - Mv = 26.555
W2 = 1.764 1.350 2.381 X = MR/We = 1.288
W3 = 1.301 1.450 1.886 e = B/2 - X = 0.237 1.05 0.50 1.50
W4 = 13.010 2.300 29.922 B/3= B/3 = 1.017 51.80 cm
W5 = 2.196 1.525 3.349 B/6= B/6 = 0.508
DATOS:
We = 20.622 Me = 40.243 Si e<BB/6 q1= We/B (1+6e/B) < qa ƴs = 1.77 t/m3
Si e>B/6 q2=2We/(3L(b/2-e))< qa Ka = 0.33
q = q1 o q2 = 9.918 Suelo Tipo II
R esta en el tercio medio central 3.605
qa = 10 T/m2
SE ACEPTA EL CALCULO : f'c = 210 Kg/cm2
fy = 4200 Kg/cm2
Si FSD >=1.50 O.K Pe = 2.40 Kg/cm3
Si FSV >=1.50 O.K
Si qa >= q1 o q2
q1 O.K
q2 O.K
/ / / / / W2
1.20
DIMENSIONES DEL DIENTE NO ES NECESARIO W5
0.30
Kp = 10 Ka 3.300
Pp1= Kp H x Pes 7.009 Asumir este
0.30
Pp2= Kp Hd x Pes 8.762 valor
0.30
DISEÑO DEL DEDO /
/
7.745 t/m2
M = L2 (q1+2 q2)/6 = 5.068 t-m / m ### t/m2
Mu = 1,40 M 7.095 t-m / m
### t/m2
1.50
DISEÑO DEL TALON \
\
0.30
\
\
1 = H/3
1 1.63 0.4242 0.594 0.25 0.713 8.33 8.33 18 31
1.63
2 3.27 3.3935 4.751 0.35 4.072 11.67 11.67 16 60
3 4.90 11.4531 ### 0.45 10.69 15.00 15.00 16 60
4.00
2 = H/3
1.63
3 = H/3
1.63
1.20
/ / / / / PH = Kh x Pes x h
0.30
1.05 0.50 1.50
CALCULO DE MUROS DE GRAVEDAD
UBICACION : PUENTE SAN MIGUEL
FECHA: MAYO/2012
0.20
0.50
W3
4.00
Agua
Ph = Ka.Pes.H /2 = 7.897
2
4.40
4.40
W1
Mv = Ph H/3 = 13.688
W2
FSD= 0.60 We/Ph = 1.567
1.20
FSV= Me/Mv = 2.940
PESO B.P MOMENTOS W5
0.30
W1 = 2.352 1.150 2.705 MR = Me - Mv = 26.555
W2 = 1.764 1.350 2.381 X = MR/We = 1.288
W3 = 1.301 1.450 1.886 e = B/2 - X = 0.237
W4 = 13.010 2.300 29.922 B/3= B/3 = 1.017 1.05 0.50 1.50
W5 = 2.196 1.525 3.349 B/6= B/6 = 0.508 51.80 cm
DATOS:
We = 20.622 Me = 40.243 Si e<BB/6 q1= We/B (1+6e/B) < qa ƴs = = 1.77 t/m3
Si e>B/6 q2=2We/(3L(b/2-e))< qa Ka = 0.33
q = q1 o q2 = 9.918 Suelo Tipo II
R esta en el tercio medio central 3.605
qa = 10 T/m2
SE ACEPTA EL CALCULO : f'c = 210 Kg/cm2
fy = 4200 Kg/cm2
Si FSD >=1.50 O.K Peh = 2.40 Kg/cm3
Si FSV >=1.50 O.K
Si qa >= q1 o q2
q1 O.K
q2 O.K
/ / / / / W2
1.20
DIMENSIONES DEL DIENTE NO ES NECESARIO W5
0.30
Kp = 10 Ka 3.300
Pp1= Kp H x Pes 7.009
Pp2= Kp Hd x Pes 8.762
Pp = (Pp1+Pp2)/2 Hd 2.366
0.30
DISEÑO DEL DEDO /
/
7.745
M = L2 (q1+2 q2)/6 = 5.068 t-m / m ### t/m2
Mu = 1,40 M 7.095 t-m / m
###
1.50
DISEÑO DEL TALON \
\
0.30
\
\
1 = H/3
1 1.63 0.4242 0.594 0.25 0.713 8.33 8.33 18 31
1.63
2 3.27 3.3935 4.751 0.35 4.072 11.67 11.67 16 60
3 4.90 11.4531 ### 0.45 10.69 15.00 15.00 16 60
4.00
2 = H/3
1.63
3 = H/3
1.63
1.20
/ / / / /
0.30
1.05 0.50 1.50
α=
W4 Relleno
1.50
cm
Asumir este
0.30
valor
t/m2
t/m2
t/m2
PH = Kh x Pes x h
1.50
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD 22.00m No carrilles= 1 U
ANCHO TOTAL 5.00m (Ancho de via+Veredas)
FECHA =ABR 2015
### 0.60m
hv=1.10(0.15+L/18)= ###
###
###
###
###
###
###
###
###
###
5.00m
DATOS:
ɣhormigón = 2.40 T/m3
ɣm = 1.80 T/m3 ɸ = 30°
a) MUERTA INFRAESTRUCTURA
### 0.60m
###
P5
###
P6
P4
###
P7
###
P8
P3
###
P2
###
P1
A
2.40m 0.90m 1.70m
5.00m
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 22.00m
ANCHO TOTAL 5.00m (Ancho de via+Veredas)
FECHA =MARZO 2015
DATOS:
ɣh.a = 2.40 T/m3
ɣh.s = 2.20 T/m3
N de vig = 2 U
###
0
0.750m
Element Superestructura
Volumen WS YA MDSA
Capa de rodadura ### 0.385T/m 1.575m 0.606T-m
Aceras ### 0.870T/m 1.675m 1.457T-m
Tablero (Losa) ### 1.601T/m 1.435m 2.297T-m ### ###
Volados ### 0.938T/m 1.435m 1.347T-m
Vigas ### 2.534T/m 0.660m 1.673T-m
Cartelas ### 0.096T/m 1.287m 0.124T-m
6.425T/m 7.504T-m
Diafragmas Espesor Volumen P
Diafragma de apoyo 0.250m ### 6.60Ton
Diafragma central 0.250m ### 2.32Ton
8.92Ton
D = 16.30Ton
XA = 2.000m
MAD= 32.61T-m
Cortante: Momento:
Fr= P (1 + (a+b)/= 1.80 P Fr = S/1.80 = 1.39 P
Rd=5.00 T
Rt=7.50 T
Rt=7.50 T
4.00m 4.00m
14.00m
RL = 24.60Ton
XA = 2.000m
MAL= 49.20T-m
d) FLOTACION (B)
### 0.60m
###
h' =
###
P5
###
P6
P4
###
###
###
P7
### P8
0.145m P3
###
###
P1
A
2.40m 0.90m 1.70m
5.00m
MBA= 11.71T-m
e) VIENTO (W)
Longitud ###
Altura = 1.800m
WD = ###
Viento W YA MWDA
Viga+tablero+acera 0.455T/m 6.850m 3.114T-m
3.114T-m
MWLA = 26.117T-m
No carril = 1 U
% C. viva= 5%
FL = ### YA = 9.630m
MFLA = 1.296T-m
h' = 0.600m
ɸ = 30° Ka = Tan2 (45-ɸ/2) Kp = 1/Ka
ɣm = 1.80 T/m3 Ka = 0.333 Kp = 3
H ( H + 3 h' )
Y = 3 ( H + 2 h' ) = 2.773m
MEtA = 58.406T-m
Carga (P = ###
MYA = ###
Y = MYA / P = 3.53m
MEQIA = 7.228T-m
WS = 6.425T/m
MDSA = 7.504T-m
D = ###
YS = ( H - hviga) + = 7.42m
MEQSA= 9.676T-m
rminar Factor de Rueda
1.80m ###
2.500m
###
###
###
###
###
###
2.100m
###
PROYECTO: PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
RESUMEN DE SOLICITACIONES
No TIPO SIMBOLO SENTIDO CARGA SIMBOLO MOMENTO
1 Muerta Superestructura D ### MAD 32.608T-m
2 Viva Superestructura L ### MAL 49.202T-m
3 Flotación B 4.974Ton MBA 11.714T-m
4 Viento D WD 0.455Ton MWDA 3.114T-m
5 Viento L WL 2.712Ton MWLA 26.117T-m
6 Fuerza Longitud. LF 0.135Ton MFAL 1.296T-m
7 Empuje de tierra Et ### MEtA 58.406T-m
8 Sismo Infraestructura EQI 2.047Ton MEQIA 7.228T-m
9 Sismo Superestructura EQS 1.304Ton MEQSA 9.676T-m
10 Muerta Infraestructura P ### MPXA ###
ANALISIS DE ESTABILIDAD
CUMPLIMIENTO
Ϭmin FV FD FV FD OBSERVACION
4.06T/m2 2.608 1.097 OK Poner espol Base estribo
7.33T/m2 4.009 2.068 OK OK
3.69T/m2 3.006 1.452 OK Poner espolon
0.42T/m2 2.699 1.811 OK OK
0.98T/m2 2.456 1.280 OK Poner espolonBase estribo
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 22.00m
ANCHO TOTAL 5.00m (Ancho de via+Veredas)
FECHA =MARZO 2015
DISEÑO DE LA PANTALLA
DATOS:
h' = 0.600m f'c = 280 Kg/cm2 fy = 4200 Kg/cm2
ɸ = 30° Ka = Tan2 (45-ɸ/2) Kp = 1/Ka
ɣm = 1.80 T/m3 Ka = 0.333 Kp = 3
Re = ###
E = 1/2 ɣs Ka H (H+2 h')= ###
H ( H + 3 h' )
Y = 3 ( H + 2 h' ) = 2.571m
### 0.60m
###
h' =
1ɸ16mm@25cm 1ɸ16mm@2
Hv = H viga
###
###
(4)
###
###
###
###
(3)
###
###
0.629m
###
1ɸ14mm@12.5cm
###
(2)
###
0.694m
1ɸ18mm@12.5cm
###
1ɸ14mm@10cm
1ɸ25mm@25cm (1)
###
1ɸ16mm@20cm
###
ARMADURA EN LA PANTALLA
H Y M Mu d K As As min
FRANJA ϼ As colocar
(m) (m) ( t-m /m ) 1.60 M ( m) (Kg/cm ) 2
cm2/m
1 7.20m 2.571m ### ### 0.830m 10.836m 0.0031 25.92cm2 27.67 27.67
2 4.00m 1.49m 9.280T-m ### 0.624m 3.819m 0.0011 6.75cm2 20.78 20.78
3 3.00m 1.14m 4.320T-m 6.912T-m 0.559m 2.212m 0.0006 3.49cm2 18.63 18.63
4 1.55m 0.63m 0.805T-m 1.288T-m 0.230m 2.434m 0.0007 1.58cm2 7.67 7.67
ARMADURA DE DISTRIBUCION
H Y M Mu d K As As min
EJE ϼ norma As colocar
(m) (m) ( t-m /m ) 1.60 M ( m) (Kg/cm2) cm2/m
2 lados 0.668m 0.000m 0.0012 10.80cm2 0.00 10.80
E = 1/2 ɣs Ka H (H+2 =
h') ###
Mr = Me - = ###
X = Mr/nΣF = 2.017m
e = B/2 - X = 0.483m
Si e<B/6 q1= nΣF/B (1+6e/B) < = ###
Si e>B/6 q2=2nΣF/(3L(b/2-e))< = 7.33T/m2
1ɸ22mm@10cm
###
5.00m
###
###
###
###
###
###
###
###
=
M = L2 (q1+2 q2)/6 ###
12.96T/m2
###
###
###
###
M = q L2 / 2 - L2 (q1+2 q2) / 6
1ɸ22mm@10cm
1ɸ12mm@15cm 1ɸ16mm@10cm
ɵ S calculo S asumidoAs colocado
(mm) ( cm ) ( cm ) ( cm2 )
14mm 6cm 12.5cm 52.308 OK 47.11%
18mm 12cm 12.5cm 20.358 REDISTIBUIR
25mm 26cm 25cm 19.635 OK
16mm 26cm 25cm 8.042 OK
LENO)
ɵ S calculo S asumidoAs colocado
(mm) ( cm ) ( cm ) ( cm2 )
14mm 11cm 10cm 15.394 OK 6.46%
As colocado
( cm2 )
20.106 OK 12.13%
4.51%
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 22.00m
ANCHO TOTAL 5.00m (Ancho de via+Veredas)
FECHA =MARZO 2015
### 0.60m
1ɸ16mm@25cm 1ɸ16mm@2
###
###
###
###
0.600m
1ɸ16mm@20cm
1ɸ14mm@12.5cm
###
0.600m
1ɸ18mm@12.5cm
###
1ɸ14mm@10cm
1ɸ25mm@25cm
1ɸ22mm@10cm
###
1ɸ12mm@15cm 1ɸ16mm@10cm
5.00m