Está en la página 1de 1

A B C D E

TL-1
1 COLUMNA CM-2
SE-1
TL-1
SE-2
EMB-1
CM-2 SE-2
EMB-1
SE-2
TL-1
SE-1
COLUMNA CM-1
CM-2
PB-1 PB-1 PB-1 PB-1 PB-1
CM-1 CM-1 CM-1 CM-1 CM-1

LOSA DE CIMENTACION

LS VAR #3@15
ESPESOR H = 12 cm.

rec = 5 cm.
CONSULTOR:

TL-1
TL-1

TL-1

TL-1

TL-1
LS VAR #3@15
PLACA BASE PB-1

PROCEDIMIENTO

SE-1 SE-2 SE-2 SE-2 SE-1 1.- COLOCAR ANCLAS.


PB-1 PB-1 PB-1 PB-1 PB-1
CM-1 CM-1 CM-1 CM-1 CM-1 NORTE
TL-1 TL-1 2.- DE DEJA ANCLA 5 cm SOBRE EL
EMB-1
2 TL-1 EMB-1
NIVEL TOPE DE CONCRETO DEL
DADO.

3.- SE COLOCA PLACA BARRENADA,

ANCLA AN-1 TRABE DE LIGA TL-1 ESTA DEBERA DE ESTAR AL


MISMO NIVEL QUE EL TOPE DE
CONCRETO QUE EL DADO.

4.- SE SUELDAN ANCLAS A LA PLACA


BASE.

5.- SE PROCEDE A HACER EL


COLADO DE LOS DADOS.

6.- UNA VEZ GARANTIZADA LA


RESISTENCIA MAXIMA DEL
CONCRETO SE CAPAN LAS
ANCLAS.

EMBEBIDO EMB-1 ALZADO EMBEBIDO EMB-1


LS VAR #4@15

LI VAR #4@15

DETALLE CAPEADO DE ANCLAS CORTE A - A

LS VAR #4@15

LI VAR #4@15

DETALLE EMBEBIDO EMB-1 CORTE B - B

IMPORTANTE:

SOBRE ESPESOR SE-1

REVISIONES
LS VAR #4@15

LI VAR #4@15

NOMBRE DE PROYECTO:

LS VAR #4@15

PROYECTO ESTRUCTURAL

LI VAR #4@15
CORTE 2 - 2
CORTE 1 - 1
CONTENIDO:

CLAVE:

SOBRE ESPESOR SE-2


ARCHIVO:

ESCALA: FECHA: COTAS: