PROYECTO: CONSTRUCCIÓN DE LA DOBLE VIA "RIO SECO - HUARINA"

2 EXCAVACIÓN NO CLASIFICADA
LADO IZQUIERDO LADO DERECHO
TOTAL VOL
PROGRESIVA EXC. P/DISEÑO KCv= 1.00 EXC. P/CAMBIO DE MAT KCv = 1.00 EXC. P/DISEÑO KCv= 1.00 EXC. P/CAMBIO DE MAT KCv = 1.00
ACUM (m3)
AREA (m2) VOLUMEN (m3) VOL. ACUM (m3) AREA (m2) VOLUMEN (m3) VOL. ACUM (m3) AREA (m2) VOLUMEN (m3) VOL. ACUM (m3) AREA (m2) VOLUMEN (m3) VOL. ACUM (m3)
06+260
- - - - 17.80 17.80 - - 17.80
06+280 1.78
- - - - 31.50 49.30 - - 49.30
06+300 1.37
- - - - 61.20 110.50 - - 110.50
06+320 4.75
- - - - 186.40 296.90 - - 296.90
06+340 13.89
- - - - 299.10 596.00 - - 596.00
06+360 16.02
- - - - 207.40 803.40 - - 803.40
06+380 4.72
- - - - 127.90 931.30 - - 931.30
06+400 8.07
- - - - 180.20 1,111.50 - - 1,111.50
06+420 9.95
- - - - 186.70 1,298.20 - - 1,298.20
06+440 8.72
- - - - 171.80 1,470.00 - - 1,470.00
06+460 8.46
- - - - 168.30 1,638.30 - - 1,638.30
06+480 8.37
- - - - 148.80 1,787.10 - - 1,787.10
06+500 6.51
- - - - 100.70 1,887.80 - - 1,887.80
06+520 3.56
- - - - 54.50 1,942.30 - - 1,942.30
06+540 1.89
- - - - 18.90 1,961.20 - - 1,961.20
06+560
- - - - 8.60 1,969.80 - - 1,969.80
06+580 0.86
- - - - 19.70 1,989.50 - - 1,989.50
06+600 1.11
- - - - 16.90 2,006.40 - - 2,006.40
06+620 0.58
- - - - 5.80 2,012.20 - - 2,012.20
06+640
- - - - - 2,012.20 - - 2,012.20
- - - - - 2,012.20 - - 2,012.20
07+980
- - - - - 2,012.20 - - 2,012.20
08+000
- - - - - 2,012.20 - - 2,012.20
08+020
- - - - - 2,012.20 - - 2,012.20
08+040
- - - - - 2,012.20 - - 2,012.20
08+060
- - - - - 2,012.20 - - 2,012.20
08+080
- - - - - 2,012.20 - - 2,012.20
08+100
- - - - - 2,012.20 - - 2,012.20
08+120
- - - - - 2,012.20 - - 2,012.20
08+140
- - - - - 2,012.20 - - 2,012.20
08+160
- - - - - 2,012.20 - - 2,012.20
08+180
- - - - - 2,012.20 - - 2,012.20
08+200
- - - - - 2,012.20 - - 2,012.20
- - - - - 2,012.20 - - 2,012.20
08+660
- - - - - 2,012.20 - - 2,012.20
08+680
- - - - - 2,012.20 - - 2,012.20
08+700
- - - - - 2,012.20 - - 2,012.20
08+720
- - - - - 2,012.20 - - 2,012.20
08+740
- - - - - 2,012.20 - - 2,012.20
PROYECTO: CONSTRUCCIÓN DE LA DOBLE VIA "RIO SECO - HUARINA"
TOTAL VOL
PROGRESIVA EXC. P/DISEÑO KCv= 1.00 EXC. P/CAMBIO DE MAT KCv = 1.00 EXC. P/DISEÑO KCv= 1.00 EXC. P/CAMBIO DE MAT KCv = 1.00
ACUM (m3)
AREA (m2) VOLUMEN (m3) VOL. ACUM (m3) AREA (m2) VOLUMEN (m3) VOL. ACUM (m3) AREA (m2) VOLUMEN (m3) VOL. ACUM (m3) AREA (m2) VOLUMEN (m3) VOL. ACUM (m3)
- - - - - 2,012.20 - - 2,012.20
08+760
- - - - - 2,012.20 - - 2,012.20
08+780
- - - - - 2,012.20 - - 2,012.20
08+800
- - - - - 2,012.20 - - 2,012.20
08+820
- - - - - 2,012.20 - - 2,012.20
08+840
- - - - - 2,012.20 - - 2,012.20
08+860
- - - - - 2,012.20 - - 2,012.20
08+880
23.00 23.00 - - - 2,012.20 - - 2,035.20
08+900 2.30
57.50 80.50 - - 2.60 2,014.80 - - 2,095.30
08+920 3.45 0.26
65.70 146.20 - - 6.10 2,020.90 - - 2,167.10
08+940 3.12 0.35
43.50 189.70 - - 7.10 2,028.00 - - 2,217.70
08+960 1.23 0.36
12.50 202.20 - - 8.30 2,036.30 - - 2,238.50
08+980 0.02 0.47
9.40 211.60 - - 5.30 2,041.60 - - 2,253.20
09+000 0.92 0.06
23.50 235.10 - - 2.40 2,044.00 - - 2,279.10
09+020 1.43 0.18
22.40 257.50 - - 2.60 2,046.60 - - 2,304.10
09+040 0.81 0.08
10.70 268.20 - - 0.90 2,047.50 - - 2,315.70
09+060 0.26 0.01
3.00 271.20 - - 0.10 2,047.60 - - 2,318.80
09+080 0.04
1.20 272.40 - - - 2,047.60 - - 2,320.00
09+100 0.08
0.80 273.20 - - - 2,047.60 - - 2,320.80
09+120
- 273.20 - - 0.60 2,048.20 - - 2,321.40
09+140 0.06
- 273.20 - - 1.20 2,049.40 - - 2,322.60
09+160 0.06
- 273.20 - - 0.60 2,050.00 - - 2,323.20
09+180
13.00 286.20 - - - 2,050.00 - - 2,336.20
09+200 1.30
13.00 299.20 - - - 2,050.00 - - 2,349.20
09+220
- 299.20 - - - 2,050.00 - - 2,349.20
09+240
- 299.20 - - - 2,050.00 - - 2,349.20
09+260
- 299.20 - - - 2,050.00 - - 2,349.20
09+280
- 299.20 - - - 2,050.00 - - 2,349.20
09+300
- 299.20 - - - 2,050.00 - - 2,349.20
09+320
- 299.20 - - - 2,050.00 - - 2,349.20
09+340
- 299.20 - - - 2,050.00 - - 2,349.20
09+360
- 299.20 - - - 2,050.00 - - 2,349.20
09+380
- 299.20 - - - 2,050.00 - - 2,349.20
09+400
- 299.20 - - - 2,050.00 - - 2,349.20
09+420
- 299.20 - - - 2,050.00 - - 2,349.20
09+440
- 299.20 - - - 2,050.00 - - 2,349.20
09+460
- 299.20 - - - 2,050.00 - - 2,349.20
09+480
- 299.20 - - - 2,050.00 - - 2,349.20
09+500
- 299.20 - - - 2,050.00 - - 2,349.20
09+520
- 299.20 - - - 2,050.00 - - 2,349.20
09+540
- 299.20 - - - 2,050.00 - - 2,349.20
09+560
- 299.20 - - - 2,050.00 - - 2,349.20
PROYECTO: CONSTRUCCIÓN DE LA DOBLE VIA "RIO SECO - HUARINA"
TOTAL VOL
PROGRESIVA EXC. P/DISEÑO KCv= 1.00 EXC. P/CAMBIO DE MAT KCv = 1.00 EXC. P/DISEÑO KCv= 1.00 EXC. P/CAMBIO DE MAT KCv = 1.00
ACUM (m3)
AREA (m2) VOLUMEN (m3) VOL. ACUM (m3) AREA (m2) VOLUMEN (m3) VOL. ACUM (m3) AREA (m2) VOLUMEN (m3) VOL. ACUM (m3) AREA (m2) VOLUMEN (m3) VOL. ACUM (m3)
- 299.20 - - - 2,050.00 - - 2,349.20
09+580
- 299.20 - - - 2,050.00 - - 2,349.20
09+600
- 299.20 - - - 2,050.00 - - 2,349.20
09+620
- 299.20 - - - 2,050.00 - - 2,349.20
09+640
- 299.20 - - - 2,050.00 - - 2,349.20
09+660
- 299.20 - - - 2,050.00 - - 2,349.20
09+680
- 299.20 - - - 2,050.00 - - 2,349.20
09+700
- 299.20 - - - 2,050.00 - - 2,349.20
09+720
- 299.20 - - - 2,050.00 - - 2,349.20
09+740
- 299.20 - - - 2,050.00 - - 2,349.20
09+760
- 299.20 - - - 2,050.00 - - 2,349.20
09+780
7.20 306.40 - - - 2,050.00 - - 2,356.40
09+800 0.72
7.20 313.60 - - 1.00 2,051.00 - - 2,364.60
09+820 0.10
- 313.60 - - 4.80 2,055.80 - - 2,369.40
09+840 0.38
12.60 326.20 - - 6.90 2,062.70 - - 2,388.90
09+860 1.26 0.31
16.60 342.80 - - 5.60 2,068.30 - - 2,411.10
09+880 0.40 0.25
4.00 346.80 - - 3.80 2,072.10 - - 2,418.90
09+900 0.13
- 346.80 - - 4.20 2,076.30 - - 2,423.10
09+920 0.29
- 346.80 - - 6.00 2,082.30 - - 2,429.10
09+940 0.31
- 346.80 - - 8.60 2,090.90 - - 2,437.70
09+960 0.55
- 346.80 - - 11.50 2,102.40 - - 2,449.20
09+980 0.60
- 346.80 - - 13.30 2,115.70 - - 2,462.50
10+000 0.73
- 346.80 - - 12.80 2,128.50 - - 2,475.30
10+020 0.55
- 346.80 - - 16.30 2,144.80 - - 2,491.60
10+040 1.08
- 346.80 - - 13.30 2,158.10 - - 2,504.90
10+060 0.25
- 346.80 - - 5.80 2,163.90 - - 2,510.70
10+080 0.33
- 346.80 - - 9.20 2,173.10 - - 2,519.90
10+100 0.59
- 346.80 - - 10.00 2,183.10 - - 2,529.90
10+120 0.41
- 346.80 - - 8.50 2,191.60 - - 2,538.40
10+140 0.44
- 346.80 - - 9.60 2,201.20 - - 2,548.00
10+160 0.52
- 346.80 - - 9.10 2,210.30 - - 2,557.10
10+180 0.39
- 346.80 - - 6.80 2,217.10 - - 2,563.90
10+200 0.29
- 346.80 - - 2.90 2,220.00 - - 2,566.80
10+220
- 346.80 - - - 2,220.00 - - 2,566.80
10+240
- 346.80 - - - 2,220.00 - - 2,566.80
10+260
- 346.80 - - - 2,220.00 - - 2,566.80
10+280
- 346.80 - - 0.30 2,220.30 - - 2,567.10
10+300 0.03
- 346.80 - - 3.60 2,223.90 - - 2,570.70
10+320 0.33
- 346.80 - - 7.00 2,230.90 - - 2,577.70
10+340 0.37
- 346.80 - - 7.90 2,238.80 - - 2,585.60
10+360 0.42
18.10 364.90 - - 8.60 2,247.40 - - 2,612.30
10+380 1.81 0.44
18.10 383.00 - - 6.20 2,253.60 - - 2,636.60
PROYECTO: CONSTRUCCIÓN DE LA DOBLE VIA "RIO SECO - HUARINA"
TOTAL VOL
PROGRESIVA EXC. P/DISEÑO KCv= 1.00 EXC. P/CAMBIO DE MAT KCv = 1.00 EXC. P/DISEÑO KCv= 1.00 EXC. P/CAMBIO DE MAT KCv = 1.00
ACUM (m3)
AREA (m2) VOLUMEN (m3) VOL. ACUM (m3) AREA (m2) VOLUMEN (m3) VOL. ACUM (m3) AREA (m2) VOLUMEN (m3) VOL. ACUM (m3) AREA (m2) VOLUMEN (m3) VOL. ACUM (m3)
18.10 383.00 - - 6.20 2,253.60 - - 2,636.60
10+400 0.18
- 383.00 - - 3.70 2,257.30 - - 2,640.30
10+420 0.19
13.60 396.60 - - 5.60 2,262.90 - - 2,659.50
10+440 1.36 0.37
28.20 424.80 - - 10.70 2,273.60 - - 2,698.40
10+460 1.46 0.70
33.70 458.50 - - 18.30 2,291.90 - - 2,750.40
10+480 1.91 1.13
37.20 495.70 - - 13.10 2,305.00 - - 2,800.70
10+500 1.81 0.18
37.00 532.70 - - 1.80 2,306.80 - - 2,839.50
10+520 1.89
18.90 551.60 - - - 2,306.80 - - 2,858.40
10+540
- 551.60 - - - 2,306.80 - - 2,858.40
10+560
- 551.60 - - - 2,306.80 - - 2,858.40
10+580
- 551.60 - - - 2,306.80 - - 2,858.40
10+600 - 551.60 - - - 2,306.80 - - 2,858.40
TOTAL= 2,858.40

_______________________ _____________________
CONTRATISTA SUPERVISION
6280 1.78
6300 1.37
6320 4.75
6340 13.89
6360 16.02
6380 4.72
6400 8.07
6420 9.95
6440 8.72
6460 8.46
6480 8.37
6500 6.51
6520 3.56
6540 1.89
6580 0.86
6600 1.11
6620 0.58
8920 0.26
8940 0.35
8960 0.36
8980 0.47
9000 0.06
9020 0.18
9040 0.08
9060 0.01
9140 0.06
9160 0.06
9820 0.1
9840 0.38
9860 0.31
9880 0.25
9900 0.13
9920 0.29
9940 0.31
9960 0.55
9980 0.6
10000 0.73
10010 0.76
10020 0.55
10030 0.33
10040 1.08
10060 0.25
10080 0.33
10100 0.59
10120 0.41
10140 0.44
10160 0.52
10180 0.39
10200 0.29
10300 0.03
10320 0.33
10340 0.37
10360 0.42
10380 0.44
10400 0.18
10420 0.19
10440 0.37
10460 0.7
10480 1.13
10500 0.18