Documentos de Académico
Documentos de Profesional
Documentos de Cultura
LOGISTICA
Integrantes:
Mariana Angulo
Francesca Lucioni
Claudia Castro
Luciana Diaz
Andrea Morales
PRONÓSTICOS HILADO "A" PromMovP_Solver
MES VENTAS PRONOSTICO ERROR ABS ABS/VTAS
OCT 2,812.50
NOV 2,587.50
DIC 2,182.50
ENE 2,475.00 2266.51 -208.49 208.49 0.08
FEB 2,632.50 2490.00 -142.50 142.50 0.05
MAR 2,430.00 2572.50 142.50 142.50 0.06
ABR 2,520.00 2436.00 -84.00 84.00 0.03
MAY 2,767.50 2535.00 -232.50 232.50 0.08
JUN 2,722.50 2722.50 0.00 0.00 0.00
JUL 2,362.50 2695.50 333.00 333.00 0.14
AGO 2,317.50 2416.50 99.00 99.00 0.04
SET 2,227.50 2371.50 144.00 144.00 0.06
OCT 2,610.00 2245.50 -364.50 364.50 0.14
NOV 2,700.00 2571.00 -129.00 129.00 0.05
DIC 2,655.00 2637.00 -18.00 18.00 0.01
D(a) 29959.50 -38.37 158.13 6.3%
ME MAD MAPE
SUAVIZAMIENTO EXPONENCIAL
CODIGO 6248 OCT NOV DIC ENE FEB
VENTAS (At-1) 675 1215 1991 1305 936
PRONOSTICO (Ft-1) 675 675 945 1468 1387
ERROR 0 -540 -1046 163 451
ABS 0 540 1046 163 451
ABS/VTAS 0.00 0.44 0.53 0.13 0.48
MAD 762
MAPE 39.68%
MAR ABR MAY JUN JUL AGO SET
1710 2680 1710 1013 1823 2987 1958
1161 1436 2058 1884 1448 1635 2311
-549 -1244 348 871 -374 -1352 354
549 1244 348 871 374 1352 354
0.32 0.46 0.20 0.86 0.21 0.45 0.18
ALFA 0.50
OCT NOV DIC
1404 2565 4020
2134 1769 2167
730 -796 -1853
730 796 1853
0.52 0.31 0.46
PLAN MAESTRO DE PRODUCCION HILA
MPS (MASTER PRODUCTION SCHED
Lote
Produccion 100 LX100
Inv. Inicial 500
SEMANAS
HORIZONTE DE OCTUBRE NOVIEMBRE
PLANIFICACION 1 2 3 4 1
Inv. Inicial 500 239 95 34 90
Pronostico 225 898 225 898 257
Pedido (demanda 261 1,044 261 1,044 270
Cant. Mayor 261 1,044 261 1,044 270
Req. A Pedir 0 805 166 1,010 180
MPS 0 900 200 1,100 200
Inv. Final 239 95 34 90 20
ESTRO DE PRODUCCION HILADO "A"
MASTER PRODUCTION SCHEDULE)
SEMANAS
NOVIEMBRE DICIEMBRE
2 3 4 1 2 3 4
20 40 70 90 25 63 97
1,028 257 1,028 264 1,055 264 1,055
1,080 270 1,080 266 1,062 266 1,062
1,080 270 1,080 266 1,062 266 1,062
1,060 230 1,010 176 1,038 203 965
1,100 300 1,100 200 1,100 300 1000
40 70 90 25 63 97 35
MRP Materials
TamañoRequirement Planning Stock.
Parte Lead Time Lote Inv. Disponible Entrega Pedido Seguridad
A 1 100 500 0 10
B 1 500 200 500 - SEM 7 50
C 2 300 100 0 10
SEMANAS
OCTUBRE NOVIEMBRE
REQ. BRUTO
DEMANDA 1 2 3 4 1 2
(Def. en MPS) 0 900 200 1,100 200 1,100
R
Meses SEPTIEMBRE OCTUBRE
Semanas 1 2 3 4 1 2
A 500 200
B 1,000 500 2,000
C 1,200 2,100 1,500 2,700
SEMANAS
NOVIEMBRE DICIEMBRE
3 4 1 2 3 4
300 1,100 200 1,100 300 1,000
A
OCTUBRE NOVIEMBRE DICIE
3 4 1 2 3 4 1
200 1,100 200 1,100 300 1,100 200
100 100 100 100 100 100 100
0 0 0 0 0 0 0
10 10 10 10 10 10 10
110 1,010 110 1,010 210 1,010 110
1100 200 1100 300 1100 200 1100
100 100 100 100 100 100 100
B
OCTUBRE NOVIEMBRE DICIE
3 4 1 2 3 4 1
2,200 400 2,200 600 2,200 400 2,200
300 100 200 500 400 700 300
0 0 0 0 500 0 0
50 50 50 50 50 50 50
1,950 350 2,050 150 1,850 0 1,950
500 2500 500 2000 2000 1000
100 200 500 400 700 300 100
C
OCTUBRE NOVIEMBRE DICIE
3 4 1 2 3 4 1
1600 2700 1600 2300 1100 2200 2100
200 100 100 300 100 200 100
0 0 0 0 0 0 0
10 10 10 10 10 10 10
1,410 2,610 1,510 2,010 1,010 2,010 2,010
1800 2100 1200 2100 2100 2400 1500
100 100 300 100 200 100 100
Resumen de MRP
OCTUBRE NOVIEMBRE DICIE
3 4 1 2 3 4 1
1,100 200 1,100 300 1,100 200 1,100
500 2,500 500 2,000 0 2,000 1,000
1,800 2,100 1,200 2,100 2,100 2,400 1,500
DICIEMBRE
2 3 4
1,100 300 1,000
100 100 100
0 0 0
10 10 10
1,010 210 910
300 1000
100 100 100
DICIEMBRE
2 3 4
600 2,000 0
100 500 500
0 0 0
50 50 50
550 1,550 0
2000
500 500 500
DICIEMBRE
2 3 4
2300 1000 0
100 200 700
0 0 0
10 10 10
2,210 810 0
DICIEMBRE
2 3 4
300 1,000 0
2,000 0 0
0 0 0
PLAN MAESTRO DE PRODUCCION HILADO "X"
MPS (MASTER PRODUCTION SCHEDULE)
SEMANAS
NOVIEMBRE DICIEMBRE
2 3 4 1 2 3 4
86 60 3 77 75 67 65
724 181 724 201 805 201 805
1,026 257 1,026 402 1,608 402 1,608
1,026 257 1,026 402 1,608 402 1,608
941 197 1,023 325 1,533 335 1,543
1,000 200 1,100 400 1,600 400 1600
60 3 77 75 67 65 57
MRP Materials
Tamaño Requirement Planning Stock.
Parte Lead Time Lote Inv. Disponible Entrega Pedido Seguridad
X 1 300 100 300 - SEM 5 50
Y 1 500 200 500 - SEM 7 70
Z 2 100 500 100 - SEM 3 20
SEMANAS
OCTUBRE NOVIEMBRE
REQ. BRUTO
DEMANDA 1 2 3 4 1 2
(Def. en MPS) 0 500 200 800 300 1,000
R
Meses SEPTIEMBRE OCTUBRE
Semanas 1 2 3 4 1 2
X 600 300
Y 500 500 500
Z 800 600 1,200 500
SEMANAS
NOVIEMBRE DICIEMBRE
3 4 1 2 3 4
200 1,100 400 1,600 400 1,600
X
OCTUBRE NOVIEMBRE DICIE
3 4 1 2 3 4 1
200 800 300 1,000 200 1,100 400
200 300 100 400 300 100 200
0 0 300 0 0 0 0
50 50 50 50 50 50 50
50 550 250 650 0 1,050 250
600 300 900 1200 300 1800
300 100 400 300 100 200 100
Y
OCTUBRE NOVIEMBRE DICIE
3 4 1 2 3 4 1
600 300 900 0 1200 300 1800
300 200 400 500 500 800 500
0 0 0 0 500 0 0
70 70 70 70 70 70 70
370 170 570 0 770 0 1,370
500 1000 1000 1500 500
200 400 500 500 800 500 200
Z
OCTUBRE NOVIEMBRE DICIE
3 4 1 2 3 4 1
1200 600 1800 0 2400 600 3600
100 200 100 100 100 100 100
100 0 0 0 0 0 0
20 20 20 20 20 20 20
1,120 420 1,720 0 2,320 520 3,520
1800 2400 600 3600 600 3000
200 100 100 100 100 100 100
Resumen de MRP
OCTUBRE NOVIEMBRE DICIE
3 4 1 2 3 4 1
600 300 900 0 1,200 300 1,800
500 1,000 0 1,000 0 1,500 500
1,800 0 2,400 600 3,600 600 3,000
DICIEMBRE
2 3 4
1,600 400 1,600
100 300 200
0 0 0
50 50 50
1,550 150 1,450
300 1500
300 200 100
DICIEMBRE
2 3 4
300 1500 0
200 400 400
0 0 0
70 70 70
170 1,170 0
1500
400 400 400
DICIEMBRE
2 3 4
600 3000 0
100 100 100
0 0 0
20 20 20
520 2,920 0
DICIEMBRE
2 3 4
300 1,500 0
1,500 0 0
0 0 0
DEMANDA DIARIA lead time
MES AGOSTO D(d) "A" D(d) "X" MES LT "A" prom x mes
1 57 40 ENE 5
2 59 36 FEB 6
3 57 36 MAR 5
4 53 40 ABR 7
5 50 36 MAY 5
6 52 36 JUN 3
7 57 35 JUL 7
8 58 40 AGO 6
9 51 30 SET 5
10 54 34 OCT 7
11 58 37 NOV 5
12 54 30 DIC 3
13 50 31 Promedio 5.333
14 59 37 Desviación esta 1.312
15 57 33
16 50 33
17 54 37 Solución:
18 51 38
19 60 38 A
20 51 40 Desviación estanda 3.31
21 51 34 Desviación estanda 1.31
22 56 38 demanda diaria 54.27
23 60 30 demanda anual 29959.50
24 56 32 nuevo ROP 381.10
25 50 31 S.S (stock de seguri 91.68
26 51 31 ROP del EOQ 289.42
27 50 32
28 55 40
29 54 40
30 53 36
Promedio 54.27 35.37 Z
Desviación esta 3.31 3.37 "A"
Demanda Anual 29959.50
i 13.93%
A 1466.32
C 26.06
LT 5.333
EOQ 4919.19
lead time
MES LT "X" prom x mes
ENE 7
FEB 4
MAR 5
ABR 5
MAY 7
JUN 6
JUL 4
AGO 6
SET 5
OCT 6
NOV 7
DIC 6
Promedio 5.667
Desviación esta 1.027
X
Desviación estanda 3.37
Desviación estanda 1.03
demanda diaria 35.37
demanda anual 18828.18
nuevo ROP 248.04
S.S (stock de seguri 47.63
ROP del EOQ 200.41
90%
= 1.28
"X"
18828.18
13.93%
S/ 1,466.32
55.73
5.667
2666.69
Costo de almacenamiento. Considerar:
Solución:
Alquiler de equipos Servicios
Montacargas
Transpaleta S/126,000.00 Telefonía S/15,750.00
manual
Apilador S/36,750.00 Internet S/10,500.00
eléctrico S/57,750.00 Agua de
Alquiler S/2,275.00
Total S/220,500.00 almacén S/78,750.00
Total S/107,275.00
A X
COSTO TOTAL LOGÍSTICO PARA N = 6 COSTO TOTAL LOGÍSTICO PARA N 7
Costo de Abastecimiento S/.8,797.92 Costo de Abastecimiento S/.10,264.24
Costo de Posesión S/.9,064.82 Costo de Posesión S/.10,442.41
Costo de compra S/.780,744.59 Costo de compra S/.1,049,294.46
Lote económico 4993.25 Lote económico 2,689.74
CTL para número de pedidos (6) S/.798,607.33 CTL para número de pedidos (6) S/.1,070,001.11