ANEXO II - CONTRATO Nº TAL-GEN-PNG-16-OC-10 - DESGLOSE DE IMPORTES del OWS

SIDSA
IMPORTE
MTO 5208_02 Diferencia IMPORTE
POR PLAZO PLAZO LUGAR
TOTAL NOTAS
UNDDIAM.
PIPING SPEC DESCRIPCIÓN DEL MATERIAL ACERO AL CARBONO UM (m)PzasUM (m)Pzas UM (m) Pzas UNDAD (USD)
ENTREGA ENTREGA ENTREGA
(USD)
MACH BOLT W/ 2 HEAVY HEX NUTS & 2 WASHERS -, A307 Gr.B /
GE 1 A21F 0 112 -32.00 14.93 477.67 55-60 days 8 SEMANASFOB SHANGAI PORT
A563 Gr.A, B18.2.1/ B18.2.2, - LONGITUD 135mm
XILAN 1070 COATED STUD BOLT W/ 2 HEAVY HEX NUTS, ASTM
GE 3/4 A21F 0 112 -8.00 3.07 24.59 55-60 days 8 SEMANASFOB SHANGAI PORT
A193 Gr.B7/A194 Gr.2H, B18.2.1/ B18.2.2 L =100 mm
XILAN 1070 COATED STUD BOLT W/ 2 HEAVY HEX NUTS, ASTM
GE 3/4 A21F 0 920 -688.00 3.23 2,224.72 55-60 days 8 SEMANASFOB SHANGAI PORT
A193 Gr.B7/A194 Gr.2H, B18.2.1/ B18.2.2 L =110 mm
GE 6 A21F PIPE SMLS, ASTM A106 Gr. B, S-40, BE, ASME B36.10 310.3 417 -87.31 34.92 3,048.95 80 days 10 SEMANAS FOB PORT CHINA
45 DEG ELBOW LR , SMLS, ASTM A234 Gr WPB, S-40, BW, ASME
GE 6 A21F 236 290 -54.00 15.89 857.84 80 days 10 SEMANAS FOB PORT CHINA
B16.9
45 DEG ELBOW LR , SMLS, ASTM A234 Gr WPB, Undefined, BW,
GE 6 A21F 0 1 -1.00 28.17 28.17 80 days 10 SEMANAS FOB PORT CHINA
ASME B16.9 - 45o elbow, long radius
GE 6 A21F SLIP ON FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 28 -14.00 12.18 170.55 60-65 days 9 SEMANAS FOB TIANJIN
45 DEG ELBOW LR , SMLS, ASTM A234 Gr WPB, S-20, BW, ASME
GE 8 A21F 79 81 -2.00 25.35 50.70 80 days 10 SEMANAS FOB PORT CHINA
B16.9 - 45o elbow, long radius
GE 8 A21F BLIND FLANGE, ASTM A105, 150#, RF, ASME B16.5 31 32 -1.00 29.81 29.81 60-65 days 9 SEMANAS FOB TIANJIN
NON METALLIC RAISED GKT, PTFE ASTM D1457, 3 mm, 150#,
GE 8 A21F 0 31 -31.00 7.12 220.59 55-60 days 8 SEMANASFOB SHANGAI PORT
ASME B16.21
SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5
GE 8 A21F 0 5 -4.00 5.02 20.08 55-60 days 8 SEMANASFOB SHANGAI PORT
mm, 150#, ASME B16.20
NON MET RAISED GSKT, RUBBER, -, 3 mm, 150#, B/. FLG RF,
GE 16 A21F 0 7 -2.00 12.25 24.50 55-60 days 8 SEMANASFOB SHANGAI PORT
B16.21 (FLG AS PER ASME B16.5)
IMPORTE 7,178.18
MTO 5208_02 Diferencia IMPORTE
POR PLAZO PLAZO LUGAR
TOTAL NOTAS
UNDDIAM.
PIPING SPEC DESCRIPCIÓN DEL MATERIAL ACERO AL CARBONO UM (m)PzasUM (m)Pzas UM (m) Pzas UNDAD ENTREGA ENTREGA ENTREGA
(USD)
XILAN 1070 COATED STUD BOLT W/ 2 HEAVY HEX NUTS, ASTM (USD)
RCO 3/4 A21F 0 40 -8.00 3.08 24.60 55-60 days 8 SEMANASFOB SHANGAI PORT
A193 Gr.B7/A194 Gr.2H, B18.2.1/ B18.2.2 L=100 mm
XILAN 1070 COATED STUD BOLT W/ 2 HEAVY HEX NUTS, ASTM
RCO 3/4 A21F 0 128 -96.00 3.24 310.68 55-60 days 8 SEMANASFOB SHANGAI PORT
A193 Gr.B7/A194 Gr.2H, B18.2.1/ B18.2.2 L=110 mm
45 DEG ELBOW LR , SMLS, ASTM A234 Gr WPB, S-40, BW, ASME
RCO 6 A21F 0 22 -22.00 15.89 349.49 80 days 10 SEMANAS FOB PORT CHINA
B16.9 - 45o elbow, long radius
RCO 6 A21F PIPE SMLS, ASTM A106 Gr. B, S-40, BE, ASME B36.10 0 36.5 -33.63 34.73 1,168.07 80 days 10 SEMANAS FOB PORT CHINA En acero negro con protección de fábrica. Sin encintar
RCO 6 A21F SLIP ON FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 8 -4.00 11.04 44.15 60-65 days 9 SEMANAS FOB TIANJIN
SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5
RCO 6 A21F 0 5 -1.00 4.18 4.18 55-60 days 8 SEMANASFOB SHANGAI PORT
mm, 150#, MAN STD
45 DEG ELBOW LR , SMLS, ASTM A234 Gr WPB, S-20, BW, ASME
RCO 8 A21F 0 17 -17.00 25.35 431.00 80 days 10 SEMANAS FOB PORT CHINA
B16.9 - 45o elbow, long radius
90 DEG ELBOW LR , SMLS, ASTM A234 Gr WPB, S-20, BW, ASME
RCO 8 A21F 0 1 -1.00 45.11 45.11 80 days 10 SEMANAS FOB PORT CHINA
B16.9- 90o elbow, long radius
RCO 8 A21F BLIND FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 4 -4.00 32.86 131.44 60-65 days 9 SEMANAS FOB TIANJIN
NON METALLIC RAISED GKT, PTFE ASTM D1457, 3 mm, 150#,
RCO 8 A21F 0 3 -3.00 7.12 21.35 55-60 days 8 SEMANASFOB SHANGAI PORT
ASME B16.21
RCO 8 A21F PIPE SMLS, ASTM A106 Gr. B, S-20, BE, ASME B36.10 0 63 -59.89 43.55 2,608.22 80 days 10 SEMANAS FOB PORT CHINA
RCO 8 A21F SLIP ON FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 13 -9.00 18.49 166.42 60-65 days 9 SEMANAS FOB TIANJIN
SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5
RCO 8 A21F 0 4 -1.00 5.02 5.02 55-60 days 8 SEMANASFOB SHANGAI PORT
mm, 150#, MAN STD
RCO 8 A21F WN FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 1 -1.00 30.86 30.86 60-65 days 9 SEMANAS FOB TIANJIN
RCO 16 A21F SLIP ON FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 1 -1.00 75.63 75.63 60-65 days 9 SEMANAS FOB TIANJIN
IMPORTE 5,416.23
MTO 5208_02 Diferencia IMPORTE
POR PLAZO PLAZO LUGAR
TOTAL NOTAS
UNDDIAM.
PIPING SPEC DESCRIPCIÓN DEL MATERIAL ACERO AL CARBONO UM (m)PzasUM (m)Pzas UM (m) Pzas UNDAD ENTREGA ENTREGA ENTREGA
(USD)
(USD)
XILAN 1070 COATED STUD BOLT W/ 2 HEAVY HEX NUTS, ASTM
SGV 3/4 A21F 0 24 -16.00 3.08 49.20 55-60 days8-8'5 SEMANAS
FOB SHANGAI PORT
A193 Gr.B7/A194 Gr.2H, B18.2.1/ B18.2.2 L=100mm
XILAN 1070 COATED STUD BOLT W/ 2 HEAVY HEX NUTS, ASTM
SGV 3/4 A21F 0 224 -184.00 3.24 595.48 55-60 days8-8'5 SEMANAS
FOB SHANGAI PORT
A193 Gr.B7/A194 Gr.2H, B18.2.1/ B18.2.2 L=110mm
45 DEG ELBOW LR , SMLS, ASTM A234 Gr WPB, S-40, BW, ASME
SGV 6 A21F 0 84 -84.00 15.89 1,334.42 80 days 10 SEMANAS FOB PORT CHINA
B16.9 - 45o elbow, long radius
SGV 6 A21F PIPE SMLS, ASTM A106 Gr. B, S-40, BE, ASME B36.10 0 142.5 -141.21 34.88 4,925.88 80 days 10 SEMANAS FOB PORT CHINA
SGV 6 A21F SLIP ON FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 6 -5.00 12.18 60.90 60-65 days 9 SEMANAS FOB TIANJIN

SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5


SGV 6 A21F 0 3 -2.00 4.18 8.35 55-60 days8-8'5 SEMANAS
FOB SHANGAI PORT
mm, 150#, MAN STD

45 DEG ELBOW LR , SMLS, ASTM A234 Gr WPB, S-20, BW, ASME


SGV 8 A21F 0 35 -35.00 25.35 887.36 80 days 10 SEMANAS FOB PORT CHINA
B16.9 - 45o elbow, long radius
SGV 8 A21F BLIND FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 10 -10.00 29.81 298.11 60-65 days 9 SEMANAS FOB TIANJIN
NON METALLIC RAISED GKT, PTFE ASTM D1457, 3 mm, 150#,
SGV 8 A21F 0 10 -10.00 7.12 71.17 55-60 days8-8'5 SEMANAS
FOB SHANGAI PORT
ASME B16.21
SGV 8 A21F PIPE SMLS, ASTM A106 Gr. B, S-20, BE, ASME B36.10 0 160 -155.65 43.34 6,746.40 80 days 10 SEMANAS FOB PORT CHINA
SGV 8 A21F SLIP ON FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 22 -17.00 20.40 346.77 60-65 days 9 SEMANAS FOB TIANJIN
SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5
SGV 8 A21F 0 6 -1.00 5.02 5.02 55-60 days8-8'5 SEMANAS
FOB SHANGAI PORT
mm, 150#, MAN STD
SGV 12 A21F PIPE SMLS, ASTM A106 Gr. B, S-20, BE, ASME B36.10 0 2.2 -1.79 68.75 123.07 80 days 10 SEMANAS FOB PORT CHINA
SGV 16 A21F SLIP ON FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 8 -1.00 75.63 75.63 60-65 days 9 SEMANAS FOB TIANJIN
15,527.77
28,122.17

MTO 5208_02 Diferencia IMPORTE


IMPORTE PLAZO PLAZO
POR UNDAD LUGAR ENTREGA NOTAS
UND DIAM. PIPING SPEC DESCRIPCIÓN DEL MATERIAL HIERRO DÚCTIL UM (m) Pzas UM (m) Pzas UM (m) Pzas TOTAL (USD) ENTREGA ENTREGA
(USD)
MACH BOLT W/ 2 HEAVY HEX NUTS & 2 WASHERS -, A307 Gr.B / A563 Gr.A, B18.2.1/
GE 1 DI01F 0 96 -96.00 14.93 1,433.01 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
B18.2.2, - LONGITUD 135mm
MACH BOLT W/ 2 HEAVY HEX NUTS & 2 WASHERS -, A307 Gr.B / A563 Gr.A, B18.2.1/
GE 7/8 DI01F 0 36 -36.00 11.99 431.46 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
B18.2.2, - LONGITUD 115mm
MACH BOLT W/ 2 HEAVY HEX NUTS & 2 WASHERS -, A307 Gr.B / A563 Gr.A, B18.2.1/
GE 7/8 DI01F 0 24 -24.00 15.14 363.44 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
B18.2.2, -, - LONGITUD 120mm
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
INTERNAL PORTLAND CEMENT LINING + EXTERNAL
GE 10 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, B/SGT, -, AWWA C110, - 0.00 0.00 1.00 1.00 -1.00 -1.00 300.41 300.41 - 7-8 SEMANAS CIF CALLAO, PERÚ
ZINC RICH AND BITUMEN COATING ( 2 PIEZAS DE 1000
MM)
SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, ASME
GE 10 DI01F 0 1 -1.00 6.73 6.73 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
B16.20
GE 10 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 12 -12.00 6.73 80.73 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
NON MET RAISED GSKT, RUBBER, -, 3 mm, 150#, B/. FLG RF, B16.21 (FLG AS PER
GE 10 DI01F 0 1 -1.00 10.74 10.74 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
ASME B16.5)
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
45 Degree Bend, ASTM A536 Gr. 70-50-05, Spigot / Bell Ends, CLASS: -, STANDARD:
GE 10 DI01F 4 6 -2.00 280.05 560.11 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
AWWA C110
ZINC RICH AND BITUMEN COATING
ELEMENT: PIPE-, MATERIAL: ASTM A746, -, ENDS:BELL / SPIGOT, STANDARD: AWWA FCA SAN DIEGO, 1 x 5,5 mts ( coat internal Portland Cement Lining and
GE 12 DI01F 31.74 9 34.415 10 -2.68 -1.00 634.50 634.50 9-10 SEMANAS
c150 CEDULA 7.1MM EE.UU. external Zinc Rich and bitumen coating )
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
GE 12 DI01F PIPE W/ PUDDLE FLG 500 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0.00 0.00 0.50 1.00 -0.50 -1.00 1,009.78 1,009.78 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
GE 12 DI01F PIPE W/ PUDDLE FLG 500 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0.00 0.00 0.50 1.00 -0.50 -1.00 520.67 520.67 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING
NON MET RAISED GSKT, RUBBER, -, 3 mm, 150#, B/. FLG RF, B16.21 (FLG AS PER
GE 12 DI01F 0 2 -2.00 11.44 22.88 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
ASME B16.5)
GE 12 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 6 -6.00 9.87 59.22 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
GE 14 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0.00 0.00 1.00 1.00 -1.00 -1.00 429.95 429.95 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING
GE 14 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 1 -1.00 11.49 11.49 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
Pipe with Puddle Flange, ASTM A536 Gr. 70-50-05, Spigot Ends, CLASS: -, STANDARD: AWWA C110; L=1000
GE 16 DI01F 9.00 9.00 10.00 10.00 -1.00 -1.00 1,009.78 1,009.78 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
mm
ZINC RICH AND BITUMEN COATING
NON MET RAISED GSKT, RUBBER, -, 3 mm, 150#, B/. FLG RF, B16.21 (FLG AS PER
GE 16 DI01F 0 6 -6.00 12.25 73.48 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
ASME B16.5)
GE 16 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 7 -7.00 14.60 102.18 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
GE 24 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 1 -1.00 23.47 23.47 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
7,084.03
MTO 5208_01 Diferencia IMPORTE
IMPORTE PLAZO PLAZO
POR UNDAD LUGAR ENTREGA NOTAS
UND DIAM. PIPING SPEC DESCRIPCIÓN DEL MATERIAL HIERRO DÚCTIL UM (m) Pzas UM (m) Pzas UM (m) Pzas TOTAL (USD) ENTREGA ENTREGA
(USD)
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
45 Degree Bend, -, ASTM A536 Gr. 70-50-05,, -, -,-, , Spigot / Bell Ends, CLASS: -,
RCO 10 DI01F 0 2 -2.00 280.05 560.11 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
STANDARD: AWWA C110
ZINC RICH AND BITUMEN COATING
ELEMENT: PIPE-, MATERIAL: ASTM A746, -, ENDS:BELL / SPIGOT, STANDARD: AWWA FCA SAN DIEGO, 5 x 5,5 mts ( coat internal Portland Cement Lining and
RCO 10 DI01F 0 0 18.24 5 -18.24 -5.00 493.50 2,467.50 9-10 SEMANAS
c150 CEDULA 6.6MM EE.UU. external Zinc Rich and bitumen coating )
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
RCO 10 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, B/SGT, -, AWWA C110, - 0 0 1 1 -1.00 -1.00 792.82 792.82 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
RCO 10 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 0 2 2 -2.00 -2.00 540.39 1,080.77 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
RCO 10 DI01F PIPE W/ PUDDLE FLG 500 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0 0 1 2 -1.00 -2.00 469.39 938.78 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
RCO 10 DI01F PIPE W/ PUDDLE FLG 500 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 0 0.5 1 -0.50 -1.00 382.62 382.62 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING
RCO 10 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 2 -2.00 6.73 13.46 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
ELEMENT: PIPE-, MATERIAL: ASTM A746, -, ENDS:BELL / SPIGOT, STANDARD: AWWA FCA SAN DIEGO, 4 x 5,5 mts ( coat internal Portland Cement Lining and
RCO 12 DI01F 0 0 21.8 4 -21.80 -4.00 634.50 2,538.00 9-10 SEMANAS
c150 CEDULA 7.1MM EE.UU. external Zinc Rich and bitumen coating )
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
RCO 12 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 0 1 1 -1.00 -1.00 627.16 627.16 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING

SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -


INTERNAL PORTLAND CEMENT LINING + EXTERNAL
RCO 12 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, B/SGT, -, AWWA C110, - 0 0 2 1 -2.00 -1.00 1,341.11 1,341.11 - 7-8 SEMANAS CIF CALLAO, PERÚ
ZINC RICH AND BITUMEN COATING ( 2 PIEZAS DE 1000
MM)

SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -


INTERNAL PORTLAND CEMENT LINING + EXTERNAL
RCO 12 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0 0 2 1 -2.00 -1.00 1,420.10 1,420.10 - 7-8 SEMANAS CIF CALLAO, PERÚ
ZINC RICH AND BITUMEN COATING ( 2 PIEZAS DE 1000
MM)
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
INTERNAL PORTLAND CEMENT LINING + EXTERNAL
RCO 12 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 0 2 1 -2.00 -1.00 1,254.33 1,254.33 - 7-8 SEMANAS CIF CALLAO, PERÚ
ZINC RICH AND BITUMEN COATING ( 2 PIEZAS DE 1000
MM)
RCO 12 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 1 -1.00 9.87 9.87 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
ELEMENT: PIPE-, MATERIAL: ASTM A746, -, ENDS:BELL / SPIGOT, STANDARD: AWWA FCA SAN DIEGO, 1 x 5,5 mts ( coat internal Portland Cement Lining and
RCO 14 DI01F 0 0 5.05 1 -5.05 -1.00 826.26 826.26 9-10 SEMANAS
c150 CEDULA 7.9MM EE.UU. external Zinc Rich and bitumen coating )
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
RCO 14 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0 0 1 1 -1.00 -1.00 1,009.78 1,009.78 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
RCO 14 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 0 1 1 -1.00 -1.00 761.28 761.28 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING
RCO 14 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 1 -1.00 11.49 11.49 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
45 Degree Bend, -, ASTM A536 Gr. 70-50-05,, -, -,-, , Spigot / Bell Ends, CLASS: -,
RCO 16 DI01F 0 2 -2.00 575.89 1,151.78 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
STANDARD: AWWA C110
ZINC RICH AND BITUMEN COATING
ELEMENT: PIPE-, MATERIAL: ASTM A746, -, ENDS:BELL / SPIGOT, STANDARD: AWWA FCA SAN DIEGO, 7 x 1 5,5 mts ( coat internal Portland Cement Lining and
RCO 16 DI01F 0 0 20.29 7 -20.29 -7.00 1,027.42 7,191.94 9-10 SEMANAS
c150 CEDULA 8.6MM EE.UU. external Zinc Rich and bitumen coating )
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
RCO 16 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0 0 1 1 -1.00 -1.00 1,076.84 1,076.84 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
RCO 16 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 0 2 2 -2.00 -2.00 792.92 1,585.84 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
INTERNAL PORTLAND CEMENT LINING + EXTERNAL
RCO 16 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0 0 2 1 -2.00 -1.00 1,420.00 1,420.00 - 7-8 SEMANAS CIF CALLAO, PERÚ
ZINC RICH AND BITUMEN COATING ( 2 PIEZAS DE 1000
MM)
RCO 16 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 2 -2.00 14.60 29.19 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
INTERNAL PORTLAND CEMENT LINING + EXTERNAL
RCO 16 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, RF/SGT, 150#, AWWA C110, - 0 0 2 1 -2.00 -1.00 1,703.99 1,703.99 - 7-8 SEMANAS CIF CALLAO, PERÚ
ZINC RICH AND BITUMEN COATING ( 2 PIEZAS DE 1000
MM)
30,195.01
MTO 5208_01 Diferencia IMPORTE
IMPORTE PLAZO PLAZO
POR UNDAD LUGAR ENTREGA NOTAS
UND DIAM. PIPING SPEC DESCRIPCIÓN DEL MATERIAL HIERRO DÚCTIL UM (m) Pzas UM (m) Pzas UM (m) Pzas TOTAL (USD) ENTREGA ENTREGA
(USD)
MACH BOLT W/ 2 HEAVY HEX NUTS & 2 WASHERS -, A307 Gr.B / A563 Gr.A, B18.2.1/
SGV 1 DI01F 0 16 -16.00 14.93 238.84 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
B18.2.2, - L=135mm
ELEMENT: PIPE-, MATERIAL: ASTM A746, -, ENDS:BELL / SPIGOT, STANDARD: AWWA FCA SAN DIEGO, 3 x 5,5 mts ( coat internal Portland Cement Lining and
SGV 10 DI01F 0 0 13.2 3 -13.20 -3.00 493.50 1,480.50 9-10 SEMANAS
c150 CEDULA 6.6MM EE.UU. external Zinc Rich and bitumen coating )
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
SGV 10 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, B/SGT, -, AWWA C110, - 0 0 1 1 -1.00 -1.00 493.06 493.06 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
INTERNAL PORTLAND CEMENT LINING + EXTERNAL
SGV 10 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, B/SGT, -, AWWA C110, - 0 2 1 -2.00 -1.00 1,009.78 1,009.78 - 7-8 SEMANAS CIF CALLAO, PERÚ
ZINC RICH AND BITUMEN COATING ( 2 PIEZAS DE 1000
MM)
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
INTERNAL PORTLAND CEMENT LINING + EXTERNAL
SGV 10 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 4 2 -4.00 -2.00 938.78 1,877.56 - 7-8 SEMANAS CIF CALLAO, PERÚ
ZINC RICH AND BITUMEN COATING ( 2 PIEZAS DE 1000
MM)
ELEMENT: PIPE-, MATERIAL: ASTM A746, -, ENDS:BELL / SPIGOT, STANDARD: AWWA FCA SAN DIEGO, 1 x 5,5 mts ( coat internal Portland Cement Lining and
SGV 12 DI01F 0 0 5.4 1 -5.40 -1.00 634.50 634.50 9-10 SEMANAS
c150 CEDULA 6.6MM EE.UU. external Zinc Rich and bitumen coating )
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
SGV 12 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 1 1 -1.00 -1.00 627.16 627.16 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
INTERNAL PORTLAND CEMENT LINING + EXTERNAL
SGV 12 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0 2 1 -2.00 -1.00 1,418.86 1,418.86 - 7-8 SEMANAS CIF CALLAO, PERÚ
ZINC RICH AND BITUMEN COATING ( 2 PIEZAS DE 1000
MM)
SGV 12 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 1 -1.00 9.87 9.87 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
45 Degree Bend, -, ASTM A536 Gr. 70-50-05,, -, -,-, , Spigot / Bell Ends, CLASS: -,
SGV 16 DI01F 0 4 -4.00 575.89 2,303.56 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
STANDARD: AWWA C110
ZINC RICH AND BITUMEN COATING
ELEMENT: PIPE-, MATERIAL: ASTM A746, -, ENDS:BELL / SPIGOT, STANDARD: AWWA FCA SAN DIEGO, 29 x 5,5 mts ( coat internal Portland Cement Lining and
SGV 16 DI01F 0 0 154.5 29 -154.50 -29.00 1,027.42 29,795.18 9-10 SEMANAS
c150 CEDULA 8.6MM EE.UU. external Zinc Rich and bitumen coating )
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
SGV 16 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, B/SGT, -, AWWA C110, - 0 0 1 1 -1.00 -1.00 1,076.84 1,076.84 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
SGV 16 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0 0 2 2 -2.00 -2.00 1,076.84 2,153.67 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
SGV 16 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 0 4 4 -4.00 -4.00 792.82 3,171.30 - 7-8 SEMANAS CIF CALLAO, PERÚ INTERNAL PORTLAND CEMENT LINING + EXTERNAL
ZINC RICH AND BITUMEN COATING
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
INTERNAL PORTLAND CEMENT LINING + EXTERNAL
SGV 16 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, B/SGT, -, AWWA C110, - 0 0 2 1 -2.00 -1.00 1,751.32 1,751.32 - 7-8 SEMANAS CIF CALLAO, PERÚ
ZINC RICH AND BITUMEN COATING ( 2 PIEZAS DE 1000
MM)
SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -
INTERNAL PORTLAND CEMENT LINING + EXTERNAL
SGV 16 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0 0 10 5 -10.00 -5.00 1,869.71 9,348.54 - 7-8 SEMANAS CIF CALLAO, PERÚ
ZINC RICH AND BITUMEN COATING ( 2 PIEZAS DE 1000
MM)

SGV 16 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 6 -6.00 14.60 87.58 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT

SEGÚN AWAA C110 INSPECTION POR SGS INCLUIDO -


INTERNAL PORTLAND CEMENT LINING + EXTERNAL
SGV 16 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 0 10 5 -10.00 -5.00 1,585.67 7,928.34 - 7-8 SEMANAS CIF CALLAO, PERÚ
ZINC RICH AND BITUMEN COATING ( 2 PIEZAS DE 1000
MM)

NON MET RAISED GSKT, RUBBER, -, 3 mm, 150#, B/. FLG RF, B16.21 (FLG AS PER
SGV 16 DI01F 0 0 0 5 0.00 -5.00 12.25 61.23 55-60 days 8-8'5 SEMANAS FOB SHANGAI PORT
ASME B16.5)

65,467.68
Notas: 102,746.71
1.- Información para cotización. La información mostrada es en base a la TAL-GEN-PNG-MTO-5208 Rev.02 SIDSA 130,868.89
2.- Los items tachados en verde, hacen referencia a los materiales borrados.
3.- Los items en rojo, hacen referencia a los materiales adicionados.
4.- En la columna "DIFERENCIA", los números en verde indican cantidad de material faltante y los números en rojo indican cantidad de material en exceso.
5.- Tomar como referencia tambien la base de datos adjunta en la hoja excel.

1- Inspection SGS incluida para AWWA C110 de todo el material entregado en condición CIF PERU paletizado estándar en contenedor en 7-8
semanas.
2- Puddle Flanges según AWWA C110 sin desviaciones, bridas de cada accesorio según ASME B16.5 etc, únicamente los tramos de 2000 mm los
desdoblamos en 2 x 1000 mm con montaje Bell/spigot central para montaje sin problema, los puddle flange que se requieran a 200 mm del plano de
brida como se solicitó en su momento también.
3- No se presenta ningún material en ISO/EN, todo certificado como ASME/AWWA de acuerdo a lo solicitado.
4- Tubos en Dúctil ofertados en condición FCA almacén San Diego (CA) según norma AWWA.

Según la norma de referencia para AWWA C110 en recubrimiento, es decir AWWA C104/A21.4 serían estos espesores mínimos;
Para 10" - 3,2 Kg/m ( 1.6 - 3 mm)
Para 12" - 4,1 Kg/m ( 2 - 4 mm)
Para 14" - 7,1 Kg/m ( 2.6 - 5.1 mm)
Para 16" - 8,2 Kg/m ( 3.5 - 7 mm)
ANEXO II - CONTRATO Nº TAL-GEN-PNG-16-OC-10 - DESGLOSE DE IMPORTES del SCI

SIDSA
MTO 5001_0
IMPORTE
IMPORTE
POR PLAZO DE PLAZO DE LUGAR DE
UND DIAM.PIPING SPEC DESCRIPCIÓN DEL MATERIAL ACERO AL CARBONO UM (m) Pzas TOTAL NOTAS
UNDAD ENTREGA ENTREGA ENTREGA
(USD)
(USD)

FCA
GE 6 PE0F40T 45 DEG ELBOW, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYETHYLENE, PE, CLASS 200, BY MANUF,FM 10 77.13 771.34 60 DAYS 8,5 SEMANAS STAFFORD,
TEXAS, EE.UU.

FCA
GE 6 PE0F40T 90 DEG ELBOW, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYET, PE, CLASS 200, BY MANUF,FM 64 77.13 4,936.56 60 DAYS 8,5 SEMANAS STAFFORD,
TEXAS, EE.UU.

FCA
GE 8 PE0F40T 90 DEG ELBOW, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYETHYLENE,PE, CLASS 200, BY MANUF,FM 4 211.96 847.83 60 DAYS 8,5 SEMANAS STAFFORD,
TEXAS, EE.UU.

DUCTILE IRON BACK-UP RING (FOR USE WITH THE FLANGE ADAPTER), ASTM A536 GR. 65-45-12, DUCTILE IRON, FF, 200 PSI FOB SHANGAI
GE 6 PE0F40T 49 45.66 2,237.20 40 days 6 SEMANAS
(CL150), MANUF STD TO MATCH ASME B16.5, EPOXY COATED, FM PORT
DUCTILE IRON BACK-UP RING (FOR USE WITH THE FLANGE ADAPTER), ASTM A536 GR. 65-45-12, DUCTILE IRON, FF, 200 PSI FOB SHANGAI
GE 8 PE0F40T 2 56.40 112.80 40 days 6 SEMANAS
(CL150), MANUF STD TO MATCH ASME B16.5, EPOXY COATED, FM PORT

FCA
GE 6 PE0F40T IPS FLANGE ADAPTER, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYET , PE, CL 200, BY MANUF,FM 49 39.22 1,922.02 60 DAYS 8,5 SEMANAS STAFFORD,
TEXAS, EE.UU.

FCA
GE 8 PE0F40T IPS FLANGE ADAPTER, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYET , PE, CL 200, BY MANUF,FM 2 118.02 236.05 60 DAYS 8,5 SEMANAS STAFFORD,
TEXAS, EE.UU.

FOB SHANGAI
GE 6 PE0F40T NON MET RAISED GSKT, ASBESTOS FREE FB, EPDM, -, 3 mm, 150#, B/. FLG RF, B16.21 (FLG AS PER ASME B16.5) 1 7.45 7.45 40 days 6 SEMANAS
PORT
FCA
GE 6 PE0F40T PIPE, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C,POLYETHYLENE, PE, CL200, AWWA C906,FM 553 38.54 21,312.62 60 DAYS 8,5 SEMANAS STAFFORD,
TEXAS, EE.UU.

FCA
GE 8 PE0F40T PIPE, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C,POLYETHYLENE, PE, CL200, AWWA C906,FM 22.2 66.55 1,477.45 60 DAYS 8,5 SEMANAS STAFFORD,
TEXAS, EE.UU.

FOB SHANGAI
GE 6 PE0F40T NON MET FLAT GSKT, ASBESTOS FREE FB, EPDM, -, 3 mm, 150#, B/. FLG FF, B16.21 (FLG AS PER ASME B16.5) 34 8.26 280.79 40 days 6 SEMANAS
PORT

FOB SHANGAI
GE 8 PE0F40T NON MET FLAT GSKT, ASBESTOS FREE FB, EPDM, -, 3 mm, 150#, B/. FLG FF, B16.21 (FLG AS PER ASME B16.5) 1 11.08 11.08 40 days 6 SEMANAS
PORT

FOB SHANGAI
GE 3/4 PE0F40T STUD BOLT W/ 2 HEAVY HEX NUTS & WASHERS, A193 Gr.B8/A194 Gr.8, B18.2.1/ B18.2.2, ASME B1.1 L=134mm 88 10.67 938.87 40 days 6 SEMANAS Sin desviación
PORT

FOB SHANGAI
GE 3/4 PE0F40T STUD BOLT W/ 2 HEAVY HEX NUTS & WASHERS, A193 Gr.B8/A194 Gr.8, B18.2.1/ B18.2.2, ASME B1.1 L=153mm 8 11.87 94.98 40 days 6 SEMANAS Sin desviación
PORT

FCA
RCO 6 PE0F40T 45 DEG ELBOW, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYETHYLENE, PE, CLASS 200, BY MANUF,FM 1 77.13 77.13 60 DAYS 8,5 SEMANAS STAFFORD,
TEXAS, EE.UU.

FCA
RCO 6 PE0F40T 90 DEG ELBOW, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYET, PE, CLASS 200, BY MANUF,FM 5 77.13 385.67 60 DAYS 8,5 SEMANAS STAFFORD,
TEXAS, EE.UU.

DUCTILE IRON BACK-UP RING (FOR USE WITH THE FLANGE ADAPTER), ASTM A536 GR. 65-45-12, DUCTILE IRON, FF, 200 PSI FOB SHANGAI
RCO 6 PE0F40T 8 45.66 365.26 40 days 6 SEMANAS
(CL150), MANUF STD TO MATCH ASME B16.5, EPOXY COATED, FM PORT

FCA
RCO 6 PE0F40T IPS FLANGE ADAPTER, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYET , PE, CL 200, BY MANUF,FM 8 39.22 313.80 60 DAYS 8,5 SEMANAS STAFFORD,
TEXAS, EE.UU.

FOB SHANGAI
RCO 6 PE0F40T NON MET FLAT GSKT, ASBESTOS FREE FB, EPDM, -, 3 mm, 150#, B/. FLG FF, B16.21 (FLG AS PER ASME B16.5) 4 8.86 35.45 40 days 6 SEMANAS
PORT

FCA
RCO 6 PE0F40T PIPE, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C,POLYETHYLENE, PE, CL200, AWWA C906,FM 7.52 38.54 289.82 60 DAYS 8,5 SEMANAS STAFFORD,
TEXAS, EE.UU.

FCA
SGV 6 PE0F40T 90 DEG ELBOW, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYET, PE, CLASS 200, BY MANUF,FM 13 77.13 1,002.74 60 DAYS 8,5 SEMANAS STAFFORD,
TEXAS, EE.UU.

DUCTILE IRON BACK-UP RING (FOR USE WITH THE FLANGE ADAPTER), ASTM A536 GR. 65-45-12, DUCTILE IRON, FF, 200 PSI FOB SHANGAI
SGV 6 PE0F40T 16 45.66 730.51 40 days 6 SEMANAS
(CL150), MANUF STD TO MATCH ASME B16.5, EPOXY COATED, FM PORT

FCA
SGV 6 PE0F40T IPS FLANGE ADAPTER, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYET , PE, CL 200, BY MANUF,FM 16 39.22 627.60 60 DAYS 8,5 SEMANAS STAFFORD,
TEXAS, EE.UU.

FOB SHANGAI
SGV 6 PE0F40T NON MET FLAT GSKT, ASBESTOS FREE FB, EPDM, -, 3 mm, 150#, B/. FLG FF, B16.21 (FLG AS PER ASME B16.5) 8 8.86 70.90 40 days 6 SEMANAS
PORT

FCA
SGV 6 PE0F40T PIPE, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C,POLYETHYLENE, PE, CL200, AWWA C906,FM 17.50 38.54 674.45 60 DAYS 8,5 SEMANAS STAFFORD,
TEXAS, EE.UU.

IMPORTE TOTAL (USD) SIDSA 39,760.37


Notas:
1.- Información para cotización.
2.- Los items tachados en verde, hacen referencia a los materiales borrados.
3.- Los items en rojo, hacen referencia a los materiales adicionados.
4.- En la columna "DIFERENCIA", los números en verde indican cantidad de material faltante y los números en rojo indican cantidad de material en exceso.
5.- Tomar como referencia tambien la base de datos adjunta en la hoja excel.
ANEXO II - CONTRATO Nº TAL-GEN-PNG-16-OC-10 - DESGLOSE DE IMPORTES del OWS

SIDSA
IMPORTE
IMPORTE
MTO 5208_02 Diferencia POR
TOTAL
UND DIAM.
PIPING SPEC DESCRIPCIÓN DEL MATERIAL ACERO AL CARBONO UM (m)PzasUM (m)Pzas UM (m) Pzas UNDAD
(USD)
(USD)
MACH BOLT W/ 2 HEAVY HEX NUTS & 2 WASHERS -, A307 Gr.B /
GE 1 A21F 0 112 -32.00 14.93 477.67
A563 Gr.A, B18.2.1/ B18.2.2, - LONGITUD 135mm

XILAN 1070 COATED STUD BOLT W/ 2 HEAVY HEX NUTS, ASTM


GE 3/4 A21F 0 112 -8.00 3.07 24.59
A193 Gr.B7/A194 Gr.2H, B18.2.1/ B18.2.2 L =100 mm
XILAN 1070 COATED STUD BOLT W/ 2 HEAVY HEX NUTS, ASTM
GE 3/4 A21F 0 920 -688.00 3.23 2,224.72
A193 Gr.B7/A194 Gr.2H, B18.2.1/ B18.2.2 L =110 mm

GE 6 A21F PIPE SMLS, ASTM A106 Gr. B, S-40, BE, ASME B36.10 310.3 417 -87.31 34.92 3,048.95

45 DEG ELBOW LR , SMLS, ASTM A234 Gr WPB, S-40, BW, ASME


GE 6 A21F 236 290 -54.00 15.89 857.84
B16.9

45 DEG ELBOW LR , SMLS, ASTM A234 Gr WPB, Undefined, BW,


GE 6 A21F 0 1 -1.00 28.17 28.17
ASME B16.9 - 45o elbow, long radius

GE 6 A21F SLIP ON FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 28 -14.00 12.18 170.55

45 DEG ELBOW LR , SMLS, ASTM A234 Gr WPB, S-20, BW, ASME


GE 8 A21F 79 81 -2.00 25.35 50.70
B16.9 - 45o elbow, long radius

GE 8 A21F BLIND FLANGE, ASTM A105, 150#, RF, ASME B16.5 31 32 -1.00 29.81 29.81

NON METALLIC RAISED GKT, PTFE ASTM D1457, 3 mm, 150#,


GE 8 A21F 0 31 -31.00 7.12 220.59
ASME B16.21
SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5
GE 8 A21F 0 5 -4.00 5.02 20.08
mm, 150#, ASME B16.20
NON MET RAISED GSKT, RUBBER, -, 3 mm, 150#, B/. FLG RF,
GE 16 A21F 0 7 -2.00 12.25 24.50
B16.21 (FLG AS PER ASME B16.5)
IMPORTE 7,178.18
MTO 5208_02 Diferencia IMPORTE
POR
TOTAL
UND DIAM.
PIPING SPEC DESCRIPCIÓN DEL MATERIAL ACERO AL CARBONO UM (m)PzasUM (m)Pzas UM (m) Pzas UNDAD
(USD)
(USD)
XILAN 1070 COATED STUD BOLT W/ 2 HEAVY HEX NUTS, ASTM
RCO 3/4 A21F 0 40 -8.00 3.08 24.60
A193 Gr.B7/A194 Gr.2H, B18.2.1/ B18.2.2 L=100 mm

XILAN 1070 COATED STUD BOLT W/ 2 HEAVY HEX NUTS, ASTM


RCO 3/4 A21F 0 128 -96.00 3.24 310.68
A193 Gr.B7/A194 Gr.2H, B18.2.1/ B18.2.2 L=110 mm

45 DEG ELBOW LR , SMLS, ASTM A234 Gr WPB, S-40, BW, ASME


RCO 6 A21F 0 22 -22.00 15.89 349.49
B16.9 - 45o elbow, long radius

RCO 6 A21F PIPE SMLS, ASTM A106 Gr. B, S-40, BE, ASME B36.10 0 36.5 -33.63 34.73 1,168.07

RCO 6 A21F SLIP ON FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 8 -4.00 11.04 44.15
SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5
RCO 6 A21F 0 5 -1.00 4.18 4.18
mm, 150#, MAN STD

45 DEG ELBOW LR , SMLS, ASTM A234 Gr WPB, S-20, BW, ASME


RCO 8 A21F 0 17 -17.00 25.35 431.00
B16.9 - 45o elbow, long radius

90 DEG ELBOW LR , SMLS, ASTM A234 Gr WPB, S-20, BW, ASME


RCO 8 A21F 0 1 -1.00 45.11 45.11
B16.9- 90o elbow, long radius

RCO 8 A21F BLIND FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 4 -4.00 32.86 131.44
NON METALLIC RAISED GKT, PTFE ASTM D1457, 3 mm, 150#,
RCO 8 A21F 0 3 -3.00 7.12 21.35
ASME B16.21
RCO 8 A21F PIPE SMLS, ASTM A106 Gr. B, S-20, BE, ASME B36.10 0 63 -59.89 43.55 2,608.22

RCO 8 A21F SLIP ON FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 13 -9.00 18.49 166.42
SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5
RCO 8 A21F 0 4 -1.00 5.02 5.02
mm, 150#, MAN STD
RCO 8 A21F WN FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 1 -1.00 30.86 30.86

RCO 16 A21F SLIP ON FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 1 -1.00 75.63 75.63

IMPORTE 5,416.23
MTO 5208_02 Diferencia IMPORTE
POR
TOTAL
UND DIAM.
PIPING SPEC DESCRIPCIÓN DEL MATERIAL ACERO AL CARBONO UM (m)PzasUM (m)Pzas UM (m) Pzas UNDAD
(USD)
(USD)
XILAN 1070 COATED STUD BOLT W/ 2 HEAVY HEX NUTS, ASTM
SGV 3/4 A21F 0 24 -16.00 3.08 49.20
A193 Gr.B7/A194 Gr.2H, B18.2.1/ B18.2.2 L=100mm
XILAN 1070 COATED STUD BOLT W/ 2 HEAVY HEX NUTS, ASTM
SGV 3/4 A21F 0 224 -184.00 3.24 595.48
A193 Gr.B7/A194 Gr.2H, B18.2.1/ B18.2.2 L=110mm

45 DEG ELBOW LR , SMLS, ASTM A234 Gr WPB, S-40, BW, ASME


SGV 6 A21F 0 84 -84.00 15.89 1,334.42
B16.9 - 45o elbow, long radius

SGV 6 A21F PIPE SMLS, ASTM A106 Gr. B, S-40, BE, ASME B36.10 0 142.5 -141.21 34.88 4,925.88

SGV 6 A21F SLIP ON FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 6 -5.00 12.18 60.90

SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5


SGV 6 A21F 0 3 -2.00 4.18 8.35
mm, 150#, MAN STD

45 DEG ELBOW LR , SMLS, ASTM A234 Gr WPB, S-20, BW, ASME


SGV 8 A21F 0 35 -35.00 25.35 887.36
B16.9 - 45o elbow, long radius

SGV 8 A21F BLIND FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 10 -10.00 29.81 298.11
NON METALLIC RAISED GKT, PTFE ASTM D1457, 3 mm, 150#,
SGV 8 A21F 0 10 -10.00 7.12 71.17
ASME B16.21
SGV 8 A21F PIPE SMLS, ASTM A106 Gr. B, S-20, BE, ASME B36.10 0 160 -155.65 43.34 6,746.40

SGV 8 A21F SLIP ON FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 22 -17.00 20.40 346.77
SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5
SGV 8 A21F 0 6 -1.00 5.02 5.02
mm, 150#, MAN STD
SGV 12 A21F PIPE SMLS, ASTM A106 Gr. B, S-20, BE, ASME B36.10 0 2.2 -1.79 68.75 123.07

SGV 16 A21F SLIP ON FLANGE, ASTM A105, 150#, RF, ASME B16.5 0 8 -1.00 75.63 75.63
15,527.77
28,122.17

MTO 5208_02 Diferencia IMPORTE


IMPORTE
POR UNDAD
UND DIAM. PIPING SPEC DESCRIPCIÓN DEL MATERIAL HIERRO DÚCTIL UM (m) Pzas UM (m) Pzas UM (m) Pzas TOTAL (USD)
(USD)

MACH BOLT W/ 2 HEAVY HEX NUTS & 2 WASHERS -, A307 Gr.B / A563 Gr.A, B18.2.1/
GE 1 DI01F 0 96 -96.00 14.93 1,433.01
B18.2.2, - LONGITUD 135mm

MACH BOLT W/ 2 HEAVY HEX NUTS & 2 WASHERS -, A307 Gr.B / A563 Gr.A, B18.2.1/
GE 7/8 DI01F 0 36 -36.00 11.99 431.46
B18.2.2, - LONGITUD 115mm

MACH BOLT W/ 2 HEAVY HEX NUTS & 2 WASHERS -, A307 Gr.B / A563 Gr.A, B18.2.1/
GE 7/8 DI01F 0 24 -24.00 15.14 363.44
B18.2.2, -, - LONGITUD 120mm
GE 10 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, B/SGT, -, AWWA C110, - 0.00 0.00 1.00 1.00 -1.00 -1.00 300.41 300.41

SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, ASME
GE 10 DI01F 0 1 -1.00 6.73 6.73
B16.20

GE 10 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 12 -12.00 6.73 80.73

NON MET RAISED GSKT, RUBBER, -, 3 mm, 150#, B/. FLG RF, B16.21 (FLG AS PER
GE 10 DI01F 0 1 -1.00 10.74 10.74
ASME B16.5)

45 Degree Bend, ASTM A536 Gr. 70-50-05, Spigot / Bell Ends, CLASS: -, STANDARD:
GE 10 DI01F 4 6 -2.00 280.05 560.11
AWWA C110

ELEMENT: PIPE-, MATERIAL: ASTM A746, -, ENDS:BELL / SPIGOT, STANDARD: AWWA


GE 12 DI01F 31.74 9 34.415 10 -2.68 -1.00 634.50 634.50
c150 CEDULA 7.1MM

GE 12 DI01F PIPE W/ PUDDLE FLG 500 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0.00 0.00 0.50 1.00 -0.50 -1.00 1,009.78 1,009.78

GE 12 DI01F PIPE W/ PUDDLE FLG 500 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0.00 0.00 0.50 1.00 -0.50 -1.00 520.67 520.67

NON MET RAISED GSKT, RUBBER, -, 3 mm, 150#, B/. FLG RF, B16.21 (FLG AS PER
GE 12 DI01F 0 2 -2.00 11.44 22.88
ASME B16.5)

GE 12 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 6 -6.00 9.87 59.22

GE 14 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0.00 0.00 1.00 1.00 -1.00 -1.00 429.95 429.95

GE 14 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 1 -1.00 11.49 11.49

Pipe with Puddle Flange, ASTM A536 Gr. 70-50-05, Spigot Ends, CLASS: -, STANDARD: AWWA C110; L=1000
GE 16 DI01F 9.00 9.00 10.00 10.00 -1.00 -1.00 1,009.78 1,009.78
mm

NON MET RAISED GSKT, RUBBER, -, 3 mm, 150#, B/. FLG RF, B16.21 (FLG AS PER
GE 16 DI01F 0 6 -6.00 12.25 73.48
ASME B16.5)

GE 16 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 7 -7.00 14.60 102.18

GE 24 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 1 -1.00 23.47 23.47

7,084.03
MTO 5208_01 Diferencia IMPORTE
IMPORTE
POR UNDAD
UND DIAM. PIPING SPEC DESCRIPCIÓN DEL MATERIAL HIERRO DÚCTIL UM (m) Pzas UM (m) Pzas UM (m) Pzas TOTAL (USD)
(USD)

45 Degree Bend, -, ASTM A536 Gr. 70-50-05,, -, -,-, , Spigot / Bell Ends, CLASS: -,
RCO 10 DI01F 0 2 -2.00 280.05 560.11
STANDARD: AWWA C110

ELEMENT: PIPE-, MATERIAL: ASTM A746, -, ENDS:BELL / SPIGOT, STANDARD: AWWA


RCO 10 DI01F 0 0 18.24 5 -18.24 -5.00 493.50 2,467.50
c150 CEDULA 6.6MM

RCO 10 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, B/SGT, -, AWWA C110, - 0 0 1 1 -1.00 -1.00 792.82 792.82

RCO 10 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 0 2 2 -2.00 -2.00 540.39 1,080.77

RCO 10 DI01F PIPE W/ PUDDLE FLG 500 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0 0 1 2 -1.00 -2.00 469.39 938.78

RCO 10 DI01F PIPE W/ PUDDLE FLG 500 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 0 0.5 1 -0.50 -1.00 382.62 382.62

RCO 10 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 2 -2.00 6.73 13.46

ELEMENT: PIPE-, MATERIAL: ASTM A746, -, ENDS:BELL / SPIGOT, STANDARD: AWWA


RCO 12 DI01F 0 0 21.8 4 -21.80 -4.00 634.50 2,538.00
c150 CEDULA 7.1MM

RCO 12 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 0 1 1 -1.00 -1.00 627.16 627.16

RCO 12 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, B/SGT, -, AWWA C110, - 0 0 2 1 -2.00 -1.00 1,341.11 1,341.11

RCO 12 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0 0 2 1 -2.00 -1.00 1,420.10 1,420.10

RCO 12 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 0 2 1 -2.00 -1.00 1,254.33 1,254.33

RCO 12 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 1 -1.00 9.87 9.87

ELEMENT: PIPE-, MATERIAL: ASTM A746, -, ENDS:BELL / SPIGOT, STANDARD: AWWA


RCO 14 DI01F 0 0 5.05 1 -5.05 -1.00 826.26 826.26
c150 CEDULA 7.9MM

RCO 14 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0 0 1 1 -1.00 -1.00 1,009.78 1,009.78

RCO 14 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 0 1 1 -1.00 -1.00 761.28 761.28

RCO 14 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 1 -1.00 11.49 11.49

45 Degree Bend, -, ASTM A536 Gr. 70-50-05,, -, -,-, , Spigot / Bell Ends, CLASS: -,
RCO 16 DI01F 0 2 -2.00 575.89 1,151.78
STANDARD: AWWA C110

ELEMENT: PIPE-, MATERIAL: ASTM A746, -, ENDS:BELL / SPIGOT, STANDARD: AWWA


RCO 16 DI01F 0 0 20.29 7 -20.29 -7.00 1,027.42 7,191.94
c150 CEDULA 8.6MM

RCO 16 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0 0 1 1 -1.00 -1.00 1,076.84 1,076.84

RCO 16 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 0 2 2 -2.00 -2.00 792.92 1,585.84

RCO 16 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0 0 2 1 -2.00 -1.00 1,420.00 1,420.00

RCO 16 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 2 -2.00 14.60 29.19

RCO 16 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, RF/SGT, 150#, AWWA C110, - 0 0 2 1 -2.00 -1.00 1,703.99 1,703.99

30,195.01
MTO 5208_01 Diferencia IMPORTE
IMPORTE
POR UNDAD
UND DIAM. PIPING SPEC DESCRIPCIÓN DEL MATERIAL HIERRO DÚCTIL UM (m) Pzas UM (m) Pzas UM (m) Pzas TOTAL (USD)
(USD)
MACH BOLT W/ 2 HEAVY HEX NUTS & 2 WASHERS -, A307 Gr.B / A563 Gr.A, B18.2.1/
SGV 1 DI01F 0 16 -16.00 14.93 238.84
B18.2.2, - L=135mm

ELEMENT: PIPE-, MATERIAL: ASTM A746, -, ENDS:BELL / SPIGOT, STANDARD: AWWA


SGV 10 DI01F 0 0 13.2 3 -13.20 -3.00 493.50 1,480.50
c150 CEDULA 6.6MM

SGV 10 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, B/SGT, -, AWWA C110, - 0 0 1 1 -1.00 -1.00 493.06 493.06

SGV 10 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, B/SGT, -, AWWA C110, - 0 2 1 -2.00 -1.00 1,009.78 1,009.78

SGV 10 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 4 2 -4.00 -2.00 938.78 1,877.56

ELEMENT: PIPE-, MATERIAL: ASTM A746, -, ENDS:BELL / SPIGOT, STANDARD: AWWA


SGV 12 DI01F 0 0 5.4 1 -5.40 -1.00 634.50 634.50
c150 CEDULA 6.6MM

SGV 12 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 1 1 -1.00 -1.00 627.16 627.16

SGV 12 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0 2 1 -2.00 -1.00 1,418.86 1,418.86

SGV 12 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 1 -1.00 9.87 9.87

45 Degree Bend, -, ASTM A536 Gr. 70-50-05,, -, -,-, , Spigot / Bell Ends, CLASS: -,
SGV 16 DI01F 0 4 -4.00 575.89 2,303.56
STANDARD: AWWA C110

ELEMENT: PIPE-, MATERIAL: ASTM A746, -, ENDS:BELL / SPIGOT, STANDARD: AWWA


SGV 16 DI01F 0 0 154.5 29 -154.50 -29.00 1,027.42 29,795.18
c150 CEDULA 8.6MM

SGV 16 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, B/SGT, -, AWWA C110, - 0 0 1 1 -1.00 -1.00 1,076.84 1,076.84

SGV 16 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0 0 2 2 -2.00 -2.00 1,076.84 2,153.67

SGV 16 DI01F PIPE W/ PUDDLE FLG 1000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 0 4 4 -4.00 -4.00 792.82 3,171.30

SGV 16 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, B/SGT, -, AWWA C110, - 0 0 2 1 -2.00 -1.00 1,751.32 1,751.32

SGV 16 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, RF/BELL, 150#, AWWA C110, - 0 0 10 5 -10.00 -5.00 1,869.71 9,348.54

SGV 16 DI01F SPIRAL WOUND GKT, 304/GRAPHITE - C. RING/304 I. RING, 4.5 mm, 150#, MAN STD 0 6 -6.00 14.60 87.58

SGV 16 DI01F PIPE W/ PUDDLE FLG 2000 mm, A536 Gr. 70- 50-05, SGT, -, AWWA C110, - 0 0 10 5 -10.00 -5.00 1,585.67 7,928.34

NON MET RAISED GSKT, RUBBER, -, 3 mm, 150#, B/. FLG RF, B16.21 (FLG AS PER
SGV 16 DI01F 0 0 0 5 0.00 -5.00 12.25 61.23
ASME B16.5)

1- Inspection SGS incluida para


AWWA C110 de todo el
65,467.68
material entregado en
Notas: condición CIF PERU102,746.71
paletizado
1.- Información para cotización. La información mostrada es en base a la TAL-GEN-PNG-MTO-5208 Rev.02 estándar
SIDSAen contenedor en 7-8
130,868.89
2.- Los items tachados en verde, hacen referencia a los materiales borrados. semanas.
2- Puddle Flanges según
3.- Los items en rojo, hacen referencia a los materiales adicionados. AWWA C110 sin desviaciones,
4.- En la columna "DIFERENCIA", los números en verde indican cantidad de material faltante y los números en rojo indican cantidad de material en exceso. bridas de cada accesorio según
5.- Tomar como referencia tambien la base de datos adjunta en la hoja excel. ASME B16.5 etc, únicamente
los tramos de 2000 mm los
desdoblamos en 2 x 1000 mm
con montaje Bell/spigot central
para montaje sin problema, los
puddle flange que se requieran
a 200 mm del plano de brida
como se solicitó en su
momento también.
3- No se presenta ningún
material en ISO/EN, todo
certificado como ASME/AWWA
de acuerdo a lo solicitado.
4- Tubos en Dúctil ofertados en
condición FCA almacén San
Diego (CA) según norma
AWWA.

Según la norma de referencia


para AWWA C110 en
recubrimiento, es decir AWWA
C104/A21.4 serían estos
espesores mínimos;
Para 10" - 3,2 Kg/m ( 1.6 - 3
mm)
Para 12" - 4,1 Kg/m ( 2 - 4 mm)
Para 14" -
7,1 Kg/m ( 2.6 - 5.1 mm)
Para 16" -
8,2 Kg/m ( 3.5 - 7 mm)
ANEXO II - CONTRATO Nº TAL-GEN-PNG-16-OC-10 - DESGLOSE DE IMPORTES del SCI

SIDSA
MTO 5001_0
IMPORTE IMPORTE
POR
UND DIAM.PIPING SPEC DESCRIPCIÓN DEL MATERIAL ACERO AL CARBONO UM (m) Pzas TOTAL
UNDAD
(USD) (USD)

GE 6 PE0F40T 45 DEG ELBOW, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYETHYLENE, PE, CLASS 200, BY MANUF,FM 10 77.13 771.34

GE 6 PE0F40T 90 DEG ELBOW, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYET, PE, CLASS 200, BY MANUF,FM 64 77.13 4,936.56

GE 8 PE0F40T 90 DEG ELBOW, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYETHYLENE,PE, CLASS 200, BY MANUF,FM 4 211.96 847.83

DUCTILE IRON BACK-UP RING (FOR USE WITH THE FLANGE ADAPTER), ASTM A536 GR. 65-45-12, DUCTILE IRON, FF, 200 PSI
GE 6 PE0F40T 49 45.66 2,237.20
(CL150), MANUF STD TO MATCH ASME B16.5, EPOXY COATED, FM

GE 8 PE0F40T DUCTILE IRON BACK-UP RING (FOR USE WITH THE FLANGE ADAPTER), ASTM A536 GR. 65-45-12, DUCTILE IRON, FF, 200 PSI 2 56.40 112.80
(CL150), MANUF STD TO MATCH ASME B16.5, EPOXY COATED, FM

GE 6 PE0F40T IPS FLANGE ADAPTER, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYET , PE, CL 200, BY MANUF,FM 49 39.22 1,922.02

GE 8 PE0F40T IPS FLANGE ADAPTER, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYET , PE, CL 200, BY MANUF,FM 2 118.02 236.05

GE 6 PE0F40T NON MET RAISED GSKT, ASBESTOS FREE FB, EPDM, -, 3 mm, 150#, B/. FLG RF, B16.21 (FLG AS PER ASME B16.5) 1 7.45 7.45

GE 6 PE0F40T PIPE, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C,POLYETHYLENE, PE, CL200, AWWA C906,FM 553 38.54 21,312.62

GE 8 PE0F40T PIPE, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C,POLYETHYLENE, PE, CL200, AWWA C906,FM 22.2 66.55 1,477.45

GE 6 PE0F40T NON MET FLAT GSKT, ASBESTOS FREE FB, EPDM, -, 3 mm, 150#, B/. FLG FF, B16.21 (FLG AS PER ASME B16.5) 34 8.26 280.79

GE 8 PE0F40T NON MET FLAT GSKT, ASBESTOS FREE FB, EPDM, -, 3 mm, 150#, B/. FLG FF, B16.21 (FLG AS PER ASME B16.5) 1 11.08 11.08

GE 3/4 PE0F40T STUD BOLT W/ 2 HEAVY HEX NUTS & WASHERS, A193 Gr.B8/A194 Gr.8, B18.2.1/ B18.2.2, ASME B1.1 L=134mm 88 10.67 938.87

GE 3/4 PE0F40T STUD BOLT W/ 2 HEAVY HEX NUTS & WASHERS, A193 Gr.B8/A194 Gr.8, B18.2.1/ B18.2.2, ASME B1.1 L=153mm 8 11.87 94.98

RCO 6 PE0F40T 45 DEG ELBOW, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYETHYLENE, PE, CLASS 200, BY MANUF,FM 1 77.13 77.13

RCO 6 PE0F40T 90 DEG ELBOW, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYET, PE, CLASS 200, BY MANUF,FM 5 77.13 385.67

DUCTILE IRON BACK-UP RING (FOR USE WITH THE FLANGE ADAPTER), ASTM A536 GR. 65-45-12, DUCTILE IRON, FF, 200 PSI
RCO 6 PE0F40T 8 45.66 365.26
(CL150), MANUF STD TO MATCH ASME B16.5, EPOXY COATED, FM

RCO 6 PE0F40T IPS FLANGE ADAPTER, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYET , PE, CL 200, BY MANUF,FM 8 39.22 313.80

RCO 6 PE0F40T NON MET FLAT GSKT, ASBESTOS FREE FB, EPDM, -, 3 mm, 150#, B/. FLG FF, B16.21 (FLG AS PER ASME B16.5) 4 8.86 35.45

RCO 6 PE0F40T PIPE, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C,POLYETHYLENE, PE, CL200, AWWA C906,FM 7.52 38.54 289.82

SGV 6 PE0F40T 90 DEG ELBOW, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYET, PE, CLASS 200, BY MANUF,FM 13 77.13 1,002.74

DUCTILE IRON BACK-UP RING (FOR USE WITH THE FLANGE ADAPTER), ASTM A536 GR. 65-45-12, DUCTILE IRON, FF, 200 PSI
SGV 6 PE0F40T (CL150), MANUF STD TO MATCH ASME B16.5, EPOXY COATED, FM 16 45.66 730.51

SGV 6 PE0F40T IPS FLANGE ADAPTER, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C, POLYET , PE, CL 200, BY MANUF,FM 16 39.22 627.60

SGV 6 PE0F40T NON MET FLAT GSKT, ASBESTOS FREE FB, EPDM, -, 3 mm, 150#, B/. FLG FF, B16.21 (FLG AS PER ASME B16.5) 8 8.86 70.90
SGV 6 PE0F40T PIPE, HDPE PE4710, ASTM F714, ASTM D3350 CELL 445574C,POLYETHYLENE, PE, CL200, AWWA C906,FM 17.50 38.54 674.45

IMPORTE TOTAL (USD) SIDSA 39,760.37


Notas:
1.- Información para cotización.
2.- Los items tachados en verde, hacen referencia a los materiales borrados.
3.- Los items en rojo, hacen referencia a los materiales adicionados.
4. - En la col umna "DIFERENCI A", los números en verde indican cant idad de mat erial f alt ant e y los números en rojo i ndican cant idad de m at erial en exceso.
5.- Tomar como referencia tambien la base de datos adjunta en la hoja excel.