Presupuesto
01 OBRAS PROVISIONALES
02 CANAL DE CONDUCCION
03 DESARENADOR
03.05 REVESTIMIENTOS
03.06 ACCESORIOS
04 LINEA DE CONDUCCION
04.02.03 CAMA DE APOYO PARA TUBERIAS MENORES DE 6" (e=1") m 1,963.50 0.19
04.03 TUBERIAS
04.03.01 SUMINISTRO E INSTALAC. DE TUB. PVC CLASE C-7.5 DE 2" m 1,963.50 6.74
04.04.01 VALVULA DE PASO 2" (INC. CAMARA DE CONCRETO Y TAPA DE METAL) und 2.00 334.27
04.04.03 PASE AEREO: TUBERIA F.G 2" CON DADOS m 7.00 98.83
05 FLETE
Costo Directo
448.88
2,017.00
209.60
39.60
170.00
86.56
56.36
18.48
11.72
1,720.84
529.10
1,191.74
3,864.93
12.38
12.38
122.71
96.08
6.65
19.98
122.90
122.90
2,901.49
695.97
639.25
1,566.27
363.95
186.60
177.35
341.50
341.50
25,863.67
922.85
922.85
8,089.64
4,928.39
1,119.20
373.07
1,668.98
13,353.19
13,233.99
107.30
11.90
2,692.95
668.54
1,332.60
691.81
805.04
805.04
900.00
900.00
900.00
33,094.48