PROYECTO: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA, PROVINCIA DE PIURA -
PIURA''
Item Descripción UND METRADO PU PARCIAL METRADO PU PARCIAL METRADO PU PARCIAL METRADO PU PARCIAL
02.00.00 ARQUITECTURA
2.11 PINTURA
02.11.01 PINTURA LATEX VINILICO 2 MANOS EN MUROS Y COLUMNAS m2 11,235.10 5.89 66,174.74 11,408.79 5.89 67,197.77 5,403.98 5.51 29,767.70 6,004.81 5.51 33,077.33
02.11.02 PINTURA LATEX VINILICO 2 MANOS EN CIELO RASO Y VIGAS m2 5,436.40 5.89 32,020.42 5,147.89 5.89 30,321.07 2,978.23 5.51 16,405.50 2,169.66 5.51 11,951.52
02.11.03 PINTURA EN CASETAS m2 329.54 5.89 1,940.96 236.40 5.89 1,392.40 236.40 5.51 1,302.20
02.11.04 PINTURA ESMALTE EN CONTRAZOCALOs de 10 cm- ml 1,006.53 6.48 6,522.31
02.11.05 PINTURA ESMALTE EN CONTRAZOCALOs de 20 cm ml 250.90 6.48 1,625.83 1,685.59 6.48 10,922.62 505.68 5.51 2,785.51
02.11.06 PINTURA ESMALTE EN CONTRAZOCALOs de 30 cm ml 209.25 6.48 1,355.94
02.11.07 PINTURA ESMALTE EN CONTRAZOCALOs de 55 cm ml 139.62 6.48 904.74 465.53 6.48 3,016.63 256.04 5.51 1,410.40
COSTO DIRECTO 110,544.94 112,850.49 46,173.20 50,526.96
GG (10%) 11,054.49 0.00 0.00 0.00
UTI ( 10%) 11,054.49 0.00 0.00 0.00
SUB TOTAL 132,653.93 112,850.49 46,173.20 50,526.96
IGV (18%) 23,877.71 20,313.09 8,311.18 9,094.85
TOTAL 156,531.64 133,163.58 54,484.38 59,621.81
HOJA DE METRADOS DE ARQUITECTURA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE
OBRA : PIURA, PROVINCIA DE PIURA -PIURA''
PRIMER PISO
PABELLON P-1
AULA P-01
MUROS INTERIORES HASTA VIGAS 2 3.65 2.95 21.54
MUROS INTERIORES HASTA VIGAS 1 3.65 2.95 10.77
MUROS INTERIORES HASTA VIGAS 1 3.65 2.95 10.77
VENTANA V-02 -2 4.43 0.85 -7.53
VENTANA V-02 -2 4.43 0.85 -7.53
PUERTA P-01 -1 1.10 2.10 -2.31
AULA P-02
MUROS INTERIORES HASTA VIGAS 1 3.55 2.95 10.47
MUROS INTERIORES HASTA VIGAS 1 3.55 2.95 10.47
MUROS INTERIORES HASTA VIGAS 1 3.53 2.95 10.40
MUROS INTERIORES HASTA VIGAS 1 3.43 2.95 10.10
VENTANA V-03 -1 4.06 1.65 -6.69
VENTANA V-03 -1 4.03 1.65 -6.64
VENTANA V-02 -1 4.06 0.85 -3.45
VENTANA V-04 -1 4.06 0.85 -3.45
PUERTA P-01 -1 1.10 2.10 -2.31
AULA P-03
MUROS INTERIORES HASTA VIGAS 1 3.62 2.95 10.66
MUROS INTERIORES HASTA VIGAS 1 3.42 2.95 10.07
MUROS INTERIORES HASTA VIGAS 1 3.66 2.95 10.80
MUROS INTERIORES HASTA VIGAS 1 3.56 2.95 10.50
VENTANA V-03 -1 4.12 1.65 -6.79
VENTANA V-01 -1 4.16 1.65 -6.86
VENTANA V-02 -1 4.06 0.85 -3.45
VENTANA V-04 -1 3.92 0.85 -3.33
PUERTA P-01 -1 1.10 2.10 -2.31
ESCALERA
MUROS BAJOS 1 2.70 1.00 2.70
PABELLON P-2
SS.HH - NIÑOS
MUROS INTERIORES HASTA VIGAS 1 3.55 2.95 10.47
MUROS INTERIORES HASTA VIGAS 1 3.55 2.95 10.47
MUROS INTERIORES HASTA VIGAS 1 4.80 2.95 14.16
MUROS INTERIORES HASTA TECHO 1 3.13 2.95 9.22
VENTANA V-16 -2 4.05 0.85 -6.89
PUERTA P-02a -1 1.00 2.10 -2.10
SS.HH - DISCAPACIDAD
MUROS INTERIORES HASTA TECHO 1 4.80 2.95 14.16
MUROS INTERIORES HASTA TECHO 1 3.93 2.95 11.58
VENTANA V-17 -2 1.85 0.85 -3.14
PUERTA P-02 -2 1.00 2.10 -4.20
ESCALERA
MUROS BAJOS 1 2.70 1.00 2.70
HOJA DE METRADOS DE ARQUITECTURA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE
OBRA : PIURA, PROVINCIA DE PIURA -PIURA''
PABELLON P-3
AULA P-04
MUROS INTERIORES HASTA VIGAS 1 3.66 2.95 10.80
MUROS INTERIORES HASTA VIGAS 1 3.62 2.95 10.68
MUROS INTERIORES HASTA VIGAS 1 3.56 2.95 10.50
MUROS INTERIORES HASTA VIGAS 1 3.41 2.95 10.06
VENTANA V-2 -1 4.06 0.85 -3.45
VENTANA V-4 -1 3.92 0.85 -3.33
VENTANA V-1 -1 4.16 1.65 -6.86
VENTANA V-3 -1 4.12 1.65 -6.80
PUERTA P-01 -1 1.10 2.10 -2.31
AULA P-05
MUROS INTERIORES HASTA VIGAS 1 3.43 2.95 10.10
MUROS INTERIORES HASTA VIGAS 1 3.55 2.95 10.47
MUROS INTERIORES HASTA VIGAS 1 3.53 2.95 10.40
MUROS INTERIORES HASTA VIGAS 1 3.55 2.95 10.47
VENTANA V-2 -1 4.05 0.85 -3.44
VENTANA V-4 -1 3.93 0.85 -3.34
VENTANA V-1 -1 4.05 1.65 -6.68
VENTANA V-3 -1 4.03 1.65 -6.64
PUERTA P-01 -1 1.10 2.10 -2.31
ESCALERA
MUROS BAJOS 1 2.70 1.00 2.70
PABELLON I-1
ESCALERA
MUROS INTERIORES HASTA VIGAS 1 2.00 2.95 5.90
AULA I-01
MUROS INTERIORES HASTA VIGAS 4 3.65 3.25 47.45
VENTANA V-02-4 -2 4.15 0.85 -7.06
VENTANA V-01-3 -2 4.15 1.65 -13.70
PUERTA P-01 -1 1.10 2.10 -2.31
AULA I-02
MUROS INTERIORES HASTA VIGAS 4 3.65 2.95 43.07
VENTANA V-03-01 -2 4.15 1.65 -13.70
VENTANA V-04-02 -2 4.15 0.85 -7.06
SS.HH. NIÑOS-NIÑAS
MUROS INTERIORES HASTA TECHO 1 4.10 3.25 13.33
MUROS INTERIORES HASTA VIGAS 2 1.58 2.68 8.44
VENTANA V-21 -2 1.58 0.85 -2.68
AULA I-03
MUROS INTERIORES HASTA VIGAS 2 3.55 2.68 19.06
MUROS INTERIORES HASTA VIGAS 2 3.28 2.95 19.32
VENTANA V-01 -1 4.05 0.85 -3.44
HOJA DE METRADOS DE ARQUITECTURA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE
OBRA : PIURA, PROVINCIA DE PIURA -PIURA''
SUM
MUROS INTERIORES HASTA VIGAS 2 3.55 2.95 20.95
MUROS INTERIORES HASTA VIGAS 4 3.43 2.95 40.42
MUROS INTERIORES HASTA VIGAS 1 5.05 2.95 14.90
VENTANA V-01 -1 2.95 1.65 -4.87
VENTANA V-01 -1 2.83 1.65 -4.66
VENTANA V-01 -1 4.05 1.65 -6.68
VENTANA V-01 -2 3.93 1.65 -12.95
VENTANA V-03 -1 3.93 1.65 -6.48
VENTANA V-00 -1 2.00 1.65 -3.30
PUERTA -2 1.10 2.40 -5.28
PUERTA -1 1.00 2.10 -2.10
COCINA ALMACEN
MUROS INTERIORES HASTA VIGAS 1 4.48 2.95 13.20
MUROS INTERIORES HASTA VIGAS 2 3.47 2.95 20.47
VENTANA V-02 -1 4.05 0.85 -3.44
VENTANA V-01 -1 4.05 1.65 -6.68
PUERTA P-01a -1 1.00 2.10 -2.10
ESCALERA
MUROS BAJOS 1 2.00 1.00 2.00
PABELLON S-3
SS.HH NIÑOS
MUROS INTERIORES HASTA VIGAS 1 13.65 2.95 40.27
MURO INTERIOR 5 1.15 1.85 10.64
MUROS INTERIORES HASTA TECHO 1 1.85 3.25 6.01
MUROS INTERIORES HASTA TECHO 1 7.40 3.25 24.05
MUROS INTERIORES HASTA TECHO 1 3.55 2.95 10.47
VENTANA V-16 - 22 -1 11.08 0.85 -9.41
VENTANA V-12 -2 3.10 0.85 -5.27
VENTANA V--- -1 4.05 0.85 -3.44
PUERTA P-02 -2 1.00 2.10 -4.20
SS.HH NIÑAS
MUROS INTERIORES HASTA VIGAS 1 9.70 2.95 28.62
MURO INTERIOR 5 1.15 1.85 10.64
VENTANA V-16 - -1 4.88 0.85 -4.14
VENTANA V-12 -1 4.05 0.85 -3.44
PABELLON S-2
AULA S-4
MUROS INTERIORES HASTA VIGAS 1 14.05 2.95 41.45
VENTANA V-07 - 05 -1 8.08 1.65 -13.32
VENTANA V-06-05 -1 7.98 0.85 -6.78
PUERTA P-01 -1 1.10 2.10 -2.31
AULA S-5
MUROS INTERIORES HASTA VIGAS 1 14.26 2.95 42.05
VENTANA V-07 - 05 -1 8.17 1.65 -13.48
VENTANA V-06-05 -1 7.98 0.85 -6.78
PUERTA P-01 -1 1.10 2.10 -2.31
ESCALERA
MUROS BAJOS 1 2.00 1.00 2.00
SEGUNDO PISO
PABELLON P-01
AULA P-06
MUROS INTERIORES HASTA VIGAS 4 3.65 2.95 43.07
VENTANA V-05 -2 4.15 1.65 -13.70
VENTANA V-06 -2 4.15 0.85 -7.06
HOJA DE METRADOS DE ARQUITECTURA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE
OBRA : PIURA, PROVINCIA DE PIURA -PIURA''
AULA P-07
MUROS INTERIORES HASTA VIGAS 1 16.05 2.95 47.35
VENTANA V-01-+03 -1 7.98 1.65 -13.16
VENTANA V-06 -1 7.98 0.85 -6.78
PUERTA P-01 -1 1.10 2.10 -2.31
AULA P-08
MUROS INTERIORES HASTA VIGAS 1 14.25 2.95 42.04
VENTANA V-01- 03 -1 8.28 1.65 -13.65
VENTANA V-06 -1 7.98 0.85 -6.78
PUERTA P-01 -1 1.10 2.10 -2.31
ESCALERA
MUROS BAJOS 1 2.70 1.00 2.70
PABELLON P-03
AULA P-09
MUROS INTERIORES HASTA VIGAS 1 14.26 2.95 42.06
VENTANA V-04-02 -1 8.13 1.65 -13.42
VENTANA V-03-01 -1 7.98 0.85 -6.78
PUERTA P-01 -1 1.10 2.10 -2.31
AULA P-10
MUROS INTERIORES HASTA VIGAS 1 14.05 2.95 41.43
VENTANA V-04-02 -1 7.98 1.65 -13.16
VENTANA V-03.-01 -1 8.08 0.85 -6.86
PUERTA P-01 -1 1.10 2.10 -2.31
AULA P-11
MUROS INTERIORES HASTA VIGAS 1 14.56 2.95 42.95
VENTANA V-04-02 -1 8.78 0.85 -7.46
VENTANA V-03.-01 -1 8.78 1.65 -14.49
PUERTA P-01 -1 1.10 2.10 -2.31
ESCALERA
MUROS BAJOS 1 2.70 1.00 2.70
PABELLON P-02
AULA P-12
MUROS INTERIORES HASTA VIGAS 1 18.00 2.95 53.10
VENTANA V-04-02 -1 9.00 0.85 -7.65
VENTANA V-03.-01 -1 9.00 1.65 -14.85
PUERTA P-01 -1 1.10 2.10 -2.31
AULA P-13
MUROS INTERIORES HASTA VIGAS 1 18.00 2.95 53.10
VENTANA V-04-02 -1 9.00 0.85 -7.65
VENTANA V-03.-01 -1 9.00 1.65 -14.85
PUERTA P-01 -1 1.10 2.10 -2.31
LABORATORIO
MUROS INTERIORES HASTA VIGAS 1 36.00 2.95 106.20
VENTANAS -1 18.00 0.85 -15.30
VENTANAS -1 18.00 1.65 -29.70
AULA SPICOMOTRIZ
MUROS INTERIORES HASTA VIGAS 1 14.60 2.95 43.07
VENTANA V-4-2 -2 4.15 0.85 -7.06
VENTANA V-1-3 -2 4.15 1.65 -13.70
PUERTA P-01 -1 1.10 2.10 -2.31
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE
OBRA : PIURA, PROVINCIA DE PIURA -PIURA''
ESCALERA
MUROS BAJOS 1 2.70 1.00 2.70
PABELLON S-3
AULA DE INNOVACIÓN
MUROS INTERIORES HASTA VIGAS 1 28.01 2.95 82.63
MUROS INTERIORES HASTA VIGAS 1 11.80 2.95 34.81
VENTANAS -1 16.05 1.65 -26.48
VENTANA V-27 -1 15.96 0.85 -13.57
PUERTA P-01 -3 1.10 2.10 -6.93
PUERTA P-02 -1 1.00 2.10 -2.10
ESCALERA
MUROS BAJOS 1 2.00 1.00 2.00
PABELLON S-2
AULA S-10
MUROS INTERIORES HASTA VIGAS 1 14.05 2.95 41.45
VENTANAS -1 7.98 0.85 -6.78
VENTANAS -1 7.98 1.65 -13.16
PUERTA P-01 -1 1.10 2.10 -2.31
AULA S-11
MUROS INTERIORES HASTA VIGAS 1 14.24 2.95 42.01
VENTANAS -1 7.97 0.85 -6.77
VENTANAS -1 8.27 1.65 -13.65
PUERTA P-01 -1 1.10 2.10 -2.31
ESCALERA
MUROS BAJOS 1 2.00 1.00 2.00
TERCER PISO
PABELLON P-1
AULA - P-14
MUROS INTERIORES HASTA VIGAS 1 3.65 2.95 10.77
VENTANAS -1 4.15 1.65 -6.85
VENTANAS -1 4.15 0.85 -3.53
PUERTAS P-01 -1 1.10 2.10 -2.31
AULA - P-15
MUROS INTERIORES HASTA VIGAS 1 14.05 2.95 41.45
VENTANAS -1 7.98 0.85 -6.78
VENTANAS -1 8.08 1.65 -13.32
PUERTAS P-01 -1 1.10 2.10 -2.31
AULA - P-16
MUROS INTERIORES HASTA VIGAS 1 14.26 2.95 42.05
VENTANAS -1 8.28 1.65 -13.65
VENTANAS -1 7.98 0.85 -6.78
PUERTAS P-01 -1 1.10 2.10 -2.31
ESCALERA
MUROS BAJOS 1 2.70 1.00 2.70
PABELLON P-3
AULA P-17
MUROS INTERIORES HASTA VIGAS 1 14.26 2.95 42.05
VENTANAS -1 7.98 0.85 -6.78
VENTANAS -1 8.27 1.65 -13.64
PUERTA P-01 -1 1.10 2.10 -2.31
HOJA DE METRADOS DE ARQUITECTURA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE
OBRA : PIURA, PROVINCIA DE PIURA -PIURA''
AULA P-18
MUROS INTERIORES HASTA VIGAS 1 14.05 2.95 41.45
VENTANAS -1 7.98 0.85 -6.78
VENTANAS -1 8.08 1.65 -13.32
PUERTA P-01 -1 1.10 2.10 -2.31
AULA P-19
MUROS INTERIORES HASTA VIGAS 1 14.58 2.95 43.01
VENTANAS -1 8.79 0.85 -7.47
VENTANAS -1 8.79 1.65 -14.50
PUERTA P-01 -1 1.10 2.10 -2.31
ESCALERA
MUROS BAJOS 1 2.70 1.00 2.70
PABELLON P-2
BIBLIOTEA DEPOSITO
MUROS INTERIORES HASTA VIGAS 1 41.75 2.95 123.16
VENTANAS -1 18.00 0.85 -15.30
VENTANAS -1 18.00 1.65 -29.70
VENTANA … -1 4.75 1.75 -8.31
PUERTA P-01 -1 1.10 2.10 -2.31
ESCALERA
MUROS BAJOS 1 2.70 1.00 2.70
PABELLON S-3
AULA INNOVACION AREA CONECTIVIDAD
MUROS INTERIORES HASTA VIGAS 1 31.91 2.95 94.13
MUROS INTERIORES HASTA VIGAS 1 10.80 2.95 31.86
VENTANAS -1 15.96 0.85 -13.57
VENTANAS -1 15.95 1.65 -26.32
PUERTA P-01 -3 1.10 2.10 -6.93
ESCALERA
MUROS BAJOS 1 2.00 1.00 2.00
PABELLON S-2
AULA S-12 - S-13
MUROS INTERIORES HASTA VIGAS 1 32.28 2.95 95.23
VENTANAS -1 15.94 0.85 -13.55
VENTANAS -1 16.34 1.65 -26.96
PUERTA P-01 -2 1.10 2.10 -4.62
ESCALERA
MUROS BAJOS 1 2.00 1.00 2.00
TOTAL 1750.88
PRIMER PISO
PABELLON P-01
AULA P-01
MUROS INTERIORES HASTA TECHO 1 5.80 3.25 18.85
HOJA DE METRADOS DE ARQUITECTURA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE
OBRA : PIURA, PROVINCIA DE PIURA -PIURA''
ESCALERA
MUROS INTERIORES HASTA TECHO 1 4.84 3.25 15.73
MUROS INTERIORES 1 2.70 3.25 8.78
AULA P-02
MUROS INTERIORES HASTA TECHO 1 5.80 3.25 18.85
MUROS INTERIORES HASTA TECHO 1 5.30 3.25 17.23
AULA P-03
MUROS INTERIORES HASTA TECHO 1 5.80 3.25 18.85
PABELLON P-02
SS. HH. NIÑOS
MUROS INTERIORES HASTA TECHO 1 5.80 3.25 18.85
MUROS INTERIORES HASTA TECHO 1 2.25 3.25 7.31
SS. HH. M
MUROS INTERIORES HASTA TECHO 1 5.80 3.25 18.85
ESCALERA
MUROS INTERIORES HASTA VIGAS 1 5.30 3.25 17.23
MUROS INTERIORES HASTA VIGAS 1 2.45 3.25 7.96
MUROS INTERIORES HASTA VIGAS 1 5.30 3.25 17.23
PABELLON 03
AULA P-04
MUROS INTERIORES HASTA VIGAS 1 5.80 3.25 18.85
MUROS INTERIORES HASTA VIGAS 1 5.30 3.25 17.23
AULA P-05
MUROS INTERIORES HASTA VIGAS 1 5.80 3.25 18.85
ESCALERA
MUROS INTERIORES HASTA VIGAS 1 7.75 3.25 25.19
PABELLON I-1
ESCALERA
MUROS INTERIORES HASTA TECHO 2 5.50 3.25 35.75
MUROS INTERIORES HASTA TECHO 1 2.45 3.25 7.96
AULA I-01
MUROS INTERIORES HASTA TECHO 1 6.00 3.25 19.50
MUROS INTERIORES HASTA TECHO 1 5.20 3.25 16.90
PUERTA P-04 -1 0.80 2.10 -1.68
AULA I-02
MUROS INTERIORES HASTA TECHO 1 6.00 3.25 19.50
AULA I-03
HOJA DE METRADOS DE ARQUITECTURA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE
OBRA : PIURA, PROVINCIA DE PIURA -PIURA''
COCINA - ALMACEN
COCINA - ALMACEN
MUROS INTERIORES HASTA TECHO 1 5.65 3.25 18.36
SEGUNDO PISO
PABELLON P-1
AULA P-06
MUROS INTERIORES HASTA VIGAS 1 11.60 3.25 37.70
ESCALERA
MUROS INTERIORES HASTA VIGAS 1 7.30 3.25 23.73
AULA P-07-08
MUROS INTERIORES HASTA VIGAS 1 16.90 3.25 54.93
PABELLON P-3
AULA P-09-10
MUROS INTERIORES HASTA VIGAS 1 16.90 3.25 54.93
ESCALERA
MUROS INTERIORES HASTA VIGAS 1 7.50 3.25 24.38
AULA P-11
MUROS INTERIORES HASTA VIGAS 1 11.10 3.25 36.08
PABELLON P-2
AULA P-12-13
MUROS INTERIORES HASTA VIGAS 3 6.05 3.25 58.99
ESCALERA
MUROS INTERIORES HASTA VIGAS 1 9.00 3.25 29.25
LABORATORIO
MUROS INTERIORES HASTA VIGAS 2 6.05 3.25 39.33
ESCALERA
MUROS INTERIORES HASTA VIGAS 1 13.45 3.25 43.71
PABELLON S-3
AULA INNOVACION - CONECTIVIDAD
MUROS INTERIORES HASTA VIGAS 1 24.15 3.25 78.49
PABELLON S-2
AULA S-10-11
MUROS INTERIORES HASTA VIGAS 1 29.95 3.25 97.34
TERCER PISO
PABELLON P-01
AULA P-14
MUROS INTERIORES HASTA VIGAS 1 11.35 3.63 41.14
ESCALERA
MUROS INTERIORES HASTA VIGAS 1 7.55 3.63 27.37
AULA P-15-16
HOJA DE METRADOS DE ARQUITECTURA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE
OBRA : PIURA, PROVINCIA DE PIURA -PIURA''
PABELLON P-03
AULA P-147-18
MUROS INTERIORES HASTA VIGAS 1 16.65 3.63 60.36
ESCALERA
MUROS INTERIORES HASTA VIGAS 1 7.55 3.63 27.37
AULA P-19
MUROS INTERIORES HASTA VIGAS 1 11.31 3.63 40.98
PABELLON P-02
BIBLIOTECA - DEPOSITO
MUROS INTERIORES HASTA VIGAS 1 11.60 3.63 42.05
ESCALERA
MUROS INTERIORES HASTA VIGAS 1 7.55 3.63 27.37
AREA CONECTIVIDAD
MUROS INTERIORES HASTA VIGAS 1 11.60 3.63 42.05
PABELLON S-3
AULA DE INNOVACION
MUROS INTERIORES HASTA VIGAS 1 11.10 3.63 40.24
ESCALERA
MUROS INTERIORES HASTA VIGAS 1 12.85 3.63 46.58
PABELLON S-2
AULA S-12-13
MUROS INTERIORES HASTA VIGAS 1 16.90 3.63 61.26
ESCALERA
MUROS INTERIORES HASTA VIGAS 1 7.55 3.63 27.37
TOTAL 1,925.62
PRIMER PISO
SSHH PABELLON I-01
MUROS INTERIORES 1 2.60 1.85 4.81
SEGUNDO PISO
SSHH NIÑOS - NIÑAS
MUROS INTERIORES 1 5.80 1.85 10.73
TOTAL 76.46
HOJA DE METRADOS DE ARQUITECTURA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE
OBRA : PIURA, PROVINCIA DE PIURA -PIURA''
PRIMER PISO
PABELLON P-1
AULA P-01
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.85 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.05 3.00 17.52
AULA P-02
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.85 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.05 3.00 17.52
AULA P-03
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.85 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.05 3.00 17.52
ESCALERA
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 0.75 2.00 5.84
PABELLON P-2
SS.HH - NIÑOS
MUROS INTERIORES DE 2.10m 2 0.73 2.00 1.85 6.00 17.52
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 1.85 6.00 17.52
MUROS INTERIORES, DE 3.25m 4 0.73 2.00 3.00 10.00 58.4
MUROS INTERIORES, DE 2.95m 4 0.73 2.00 2.60 8.00 46.72
SS.HH - DISCAPACIDAD
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.85 6.00 35.04
MUROS INTERIORES, DE 2.95m 4 0.73 2.00 2.70 9.00 52.56
ESCALERA
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 0.75 2.00 5.84
PABELLON P-3
AULA P-04
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.85 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.05 3.00 17.52
AULA P-05
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.85 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.05 3.00 17.52
ESCALERA
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 0.75 2.00 5.84
PABELLON I-1
ESCALERA
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 0.75 2.00 5.84
AULA I-01
HOJA DE METRADOS DE ARQUITECTURA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE
OBRA : PIURA, PROVINCIA DE PIURA -PIURA''
AULA I-02
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.85 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.05 3.00 17.52
SS.HH. NIÑOS-NIÑAS
MUROS INTERIORES DE 2.10m 2 0.73 2.00 1.85 6.00 17.52
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 1.85 6.00 17.52
MUROS INTERIORES, DE 3.25m 4 0.73 2.00 3.00 10.00 58.4
AULA I-03
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.85 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.05 3.00 17.52
SUM
MUROS INTERIORES DE 2.10m 6 0.73 2.00 1.85 6.00 52.56
MUROS INTERIORES, DE 1.30m 6 0.73 2.00 1.05 3.00 26.28
COCINA ALMACEN
MUROS INTERIORES DE 2.10m 2 0.73 2.00 1.85 6.00 17.52
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 1.85 6.00 17.52
MUROS INTERIORES, DE 3.25m 5 0.73 2.00 3.00 10.00 73
ESCALERA
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 0.75 2.00 5.84
PABELLON S-3
SS.HH NIÑOS
MUROS INTERIORES DE 2.10m 12 0.73 2.00 1.85 6.00 105.12
MUROS INTERIORES, DE 3.25m 8 0.73 2.00 3.00 10.00 116.8
SS.HH NIÑAS
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.85 6.00 35.04
MUROS INTERIORES, DE 3.25m 6 0.73 2.00 3.00 10.00 87.6
ESCALERA
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 0.75 2.00 5.84
PABELLON S-2
AULA S-4
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.85 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.05 3.00 17.52
AULA S-5
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.85 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.05 3.00 17.52
ESCALERA
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 0.75 2.00 5.84
SEGUNDO PISO
PABELLON P-01
AULA P-06
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
AULA P-07
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
AULA P-08
HOJA DE METRADOS DE ARQUITECTURA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE
OBRA : PIURA, PROVINCIA DE PIURA -PIURA''
ESCALERA
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 0.85 2.00 5.84
PABELLON P-03
AULA P-09
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
AULA P-10
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
AULA P-11
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
ESCALERA
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 0.85 2.00 5.84
PABELLON P-02
AULA P-12
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
AULA P-13
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
LABORATORIO
MUROS INTERIORES DE 2.10m 8 0.73 2.00 1.95 6.00 70.08
MUROS INTERIORES, DE 1.30m 8 0.73 2.00 1.15 3.00 35.04
AULA SPICOMOTRIZ
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
AULA I-4
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
ESCALERA
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 0.85 2.00 5.84
PABELLON S-3
AULA DE INNOVACIÓN
MUROS INTERIORES DE 2.10m 16 0.73 2.00 1.95 6.00 140.16
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 3.10 10.00 58.4
ESCALERA
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 0.85 2.00 5.84
PABELLON S-2
AULA S-10
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
AULA S-11
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
ESCALERA
HOJA DE METRADOS DE ARQUITECTURA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE
OBRA : PIURA, PROVINCIA DE PIURA -PIURA''
TERCER PISO
PABELLON P-1
AULA - P-14
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
AULA - P-15
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
AULA - P-16
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
ESCALERA
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 0.85 2.00 5.84
PABELLON P-3
AULA P-17
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
AULA P-18
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
AULA P-19
MUROS INTERIORES DE 2.10m 4 0.73 2.00 1.95 6.00 35.04
MUROS INTERIORES, DE 1.30m 4 0.73 2.00 1.15 3.00 17.52
ESCALERA
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 0.85 2.00 5.84
PABELLON P-2
BIBLIOTECA DEPOSITO
MUROS INTERIORES DE 2.10m 10 0.73 2.00 1.95 6.00 87.6
MUROS INTERIORES, DE 1.30m 12 0.73 2.00 1.15 3.00 52.56
ESCALERA
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 0.75 2.00 5.84
PABELLON S-3
AULA INNOVACION AREA CONECTIVIDAD
MUROS INTERIORES DE 2.10m 16 0.73 2.00 1.85 6.00 140.16
MUROS INTERIORES, DE 3.25m 2 0.73 2.00 3.00 10.00 29.2
MUROS INTERIORES, DE 2.85m 2 0.73 2.00 2.60 8.00 23.36
ESCALERA
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 0.85 2.00 5.84
PABELLON S-2
AULA S-12 - S-13
MUROS INTERIORES DE 2.10m 6 0.73 2.00 1.95 6.00 52.56
MUROS INTERIORES, DE 1.30m 6 0.73 2.00 1.15 3.00 26.28
ESCALERA
MUROS INTERIORES, DE 1.30m 2 0.73 2.00 0.85 2.00 5.84
HOJA DE METRADOS DE ARQUITECTURA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE
OBRA : PIURA, PROVINCIA DE PIURA -PIURA''
TOTAL 3871.92
PRIMER PISO
SSHH PABELLON I-01
MUROS INTERIORES, DE 2.10m 62 0.73 2.00 1.85 6.00 543.12
SEGUNDO PISO
SSHH NIÑOS - NIÑAS
MUROS INTERIORES, DE 2.10m 12 0.73 2.00 1.85 6.00 105.12
TOTAL 648.24
M 4520.16
PESO DE ALAMBRE N° 8 0.18
TOTAL KG 813.6288
TOTAL 178.14
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA : “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA,
DISTRITO DE PIURA, PROVINCIA DE PIURA -PIURA''
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
PRIMER PISO
PABELLON I-1
SSHH NIÑOS PABELLON INICIAL 1 19.90 1.80 35.82
SSHH NIÑAS PABELLON INICIAL 1 19.90 1.80 35.82
PUERTAS -2 0.90 1.80 -3.24
SSHH NIÑOS PABELLON INICIAL 1 13.45 1.80 24.21
SSHH NIÑAS PABELLON INICIAL 1 10.45 1.80 18.81
PUERTAS -2 0.90 1.80 -3.24
COCINA 1 18.09 1.80 32.56
ALMACEN 1 14.47 1.80 26.05
PUERTAS -2 1.00 1.80 -3.60
VENTANA ALMACEN -1 4.05 0.50 -2.03
VENTANA PASE COCINA -1 2.00 0.60 -1.20
PABELLON P-2
SSHH NIÑOS 1 51.00 1.80 91.80
SSHH NIÑAS 1 45.00 1.80 81.00
PUERTAS -2 1.00 1.80 -3.60
SSHH DISC 1 10.27 1.80 18.49
SSHH DISC 1 10.27 1.80 18.49
PUERTAS -2 1.00 1.80 -3.60
SS. HH. H 1 20.41 1.80 36.74
SS. HH. M 1 20.41 1.80 36.74
PUERTAS -2 1.00 1.80 -3.60
PABELLON S-3
SSHH NIÑOS 1 36.05 1.80 64.89
SSHH NIÑAS 1 36.45 1.80 65.61
PUERTAS -2 1.00 1.80 -3.60
SSHH DISC 1 11.75 1.80 21.15
SSHH DISC 1 11.75 1.80 21.15
PUERTAS -2 1.00 1.80 -3.60
SEGUNDO PISO
PABELLON I-1
SSHH NIÑOS 1 19.93 1.80 35.87
SSHH NIÑAS 1 19.90 1.80 35.82
PUERTAS -2 0.90 1.80 -3.24
TOTAL 666.47
PRIMER PISO
PABELLON P-01
AULA P-01 MURO AP-01 AC-01 1 34.17 2.95 100.80
MURO 1 6.05 0.30 1.82
MURO 1 6.05 0.30 1.82
VENTANA ALTA -2 4.15 0.85 -7.06
VENTANA BAJA -2 4.15 1.65 -13.70
PUERTA -1 1.10 2.10 -2.31
CONTRAZOCALO -1 0.10 0.00
PABELLON I-01
ESCALERA MURO 1 15.90 2.95 46.91
MURO 1 6.40 2.95 18.88
VENTANA ALTA -1 2.00 1.95 -3.90
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA : “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA,
DISTRITO DE PIURA, PROVINCIA DE PIURA -PIURA''
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
CONTRAZOCALO -1 0.10 0.00
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
VENTANA ALTA -1 7.98 0.85 -6.78
PUERTA -1 1.10 2.10 -2.31
CONTRAZOCALO -1 0.10 0.00
PABELLON P-02
SS. HH. NIÑOS MURO SHV-01 AC-03 1 30.10 2.95 88.80
MURO 1 6.05 0.30 1.82
MURO 1 6.05 0.30 1.82
VENTANA ALTA -2 4.05 0.85 -6.89
PUERTA -1 1.00 2.10 -2.10
CONTRAZOCALO -1 0.10 0.00
SS. H.. DISC MURO SHD -01 AC-03 1 10.27 1.45 14.89
MURO -1 1.84 0.30 -0.55
VENTANA ALTA -1 1.84 0.85 -1.56
PUERTA -1 1.00 0.30 -0.30
CONTRAZOCALO -1 0.10 0.00
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
PABELLON S-03
SS.HH NIÑOS MURO SHV-02 AC-03 1 21.05 1.15 24.21
MURO 1 6.05 0.30 1.82
MURO 1 6.05 0.30 1.82
VENTANA ALTA -1 8.93 0.85 -7.59
PUERTA -1 1.00 0.30 -0.30
ZOCALO -1 1.80 0.00
SEGUNDO PISO
PABELLON P-01
AULA P-06 MURO AP-06 AC-01 1 34.17 2.95 100.80
MURO 1 6.05 0.30 1.82
MURO 1 6.05 0.30 1.82
VENTANA ALTA -2 4.15 0.85 -7.06
VENTANA BAJA -2 4.15 1.65 -13.70
PUERTA -1 1.10 2.10 -2.31
CONTRAZOCALO -1 0.10 0.00
PABELLON P-03
AULA P-09 MURO AP - 09 AC-01 1 34.17 2.95 100.80
MURO 1 6.05 0.30 1.82
MURO 1 6.05 0.30 1.82
VENTANA BAJA -1 8.28 1.65 -13.66
VENTANA ALTA -1 7.98 0.85 -6.78
PUERTA -1 1.10 2.10 -2.31
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA : “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA,
DISTRITO DE PIURA, PROVINCIA DE PIURA -PIURA''
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
CONTRAZOCALO -1 0.10 0.00
PABELLON P-02
AULA P-12 MURO AP-12 AC-01 1 33.77 2.95 99.62
MURO 1 6.05 0.30 1.82
MURO 1 6.05 0.30 1.82
VENTANA BAJA -1 9.00 1.65 -14.85
VENTANA ALTA -1 9.00 0.85 -7.65
PUERTA -1 1.10 2.10 -2.31
CONTRAZOCALO -1 0.10 0.00
PABELLON I-01
AULA PSICOMOTRIZ MURO PSI-01 AC-01 1 34.70 2.95 102.37
MURO 1 24.80 0.75 18.60
MURO 2 6.05 0.68 8.17
VENTANA -2 4.15 0.85 -7.06
VENTANA -2 4.15 1.65 -13.70
PUERTA -1 1.10 2.10 -2.31
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
PUERTA -1 0.80 2.10 -1.68
CONTRAZOCALO -1 0.10 0.00
PABELLON S-3
AULA INNOVACION MURO INN-01 AC-01 1 41.24 2.95 121.66
MURO 2 6.05 0.30 3.63
VENTANA BAJA -1 7.99 1.65 -13.18
VENTANA ALTA -1 7.98 0.85 -6.78
PUERTA -2 1.10 2.10 -4.62
PUERTA -1 1.00 2.10 -2.10
PABELLON S-2
ESCALERA MURO 1 15.90 3.25 51.68
MURO 1 6.40 3.25 20.80
VENTANA ALTA -1 2.00 1.95 -3.90
TERCER PISO
PABELLON P-01
AULA P-14 MURO AP-14 AC-01 1 34.17 2.95 100.80
MURO 1 6.05 0.68 4.08
MURO 1 6.05 0.68 4.08
VENTANA ALTA -2 4.15 0.85 -7.06
VENTANA BAJA -2 4.15 1.65 -13.70
PUERTA -1 1.10 2.10 -2.31
CONTRAZOCALO -1 0.10 0.00
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
MURO 1 5.40 2.95 15.93
VENTANA ALTA -1 2.70 1.95 -5.27
CONTRAZOCALO -1 0.10 0.00
PABELLON P-03
AULA P-17 MURO AP - 17 AC-01 1 34.17 2.95 100.80
MURO 1 6.05 0.68 4.11
MURO 1 6.05 0.68 4.11
VENTANA BAJA -1 8.28 1.65 -13.66
VENTANA ALTA -1 7.98 0.85 -6.78
PUERTA -1 1.10 2.10 -2.31
CONTRAZOCALO -1 0.10 0.00
PABELLON P-02
BIBLIOTECA MURO 1 45.64 2.95 134.64
MURO 1 6.05 0.68 4.11
PUERTA -2 1.10 2.10 -4.62
VENTANA ALTA -1 13.59 0.85 -11.55
VENTANA BAJA -1 13.59 1.65 -22.42
PUERTA -1 0.90 2.10 -1.89
PABELLON S-03
AULA INNOVACION MURO INN-01 AC-01 1 41.24 2.95 121.66
MURO 2 6.05 0.68 8.17
VENTANA BAJA -1 7.99 1.65 -13.18
VENTANA ALTA -1 7.98 0.85 -6.78
PUERTA -2 1.10 2.10 -4.62
PUERTA -1 1.00 2.10 -2.10
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
MURO 1 6.26 0.30 1.88
PUERTA -1 1.00 2.10 -2.10
PABELLON S-2
ESCALERA MURO 1 15.90 3.25 51.68
MURO 1 6.40 3.25 20.80
VENTANA ALTA -1 2.00 1.95 -3.90
0.375
TOTAL 5224.43
PRIMER PISO
PABELLON P-1 MURO EXT 1 82.99 3.25 269.72
MURO EXT 1 45.65 0.25 11.41
VENTANA ALTA -1 24.26 0.85 -20.62
VENTANA BAJA -1 24.66 1.65 -40.69
VENTANA BAJA -1 2.70 1.95 -5.27
PUERTA -3 1.10 2.10 -6.93
VACIO ESCAL -1 2.70 3.25 -8.78
0.00
PABELLON P-3 MURO EXT 1 84.78 3.25 275.54
MURO EXT 1 48.89 0.25 12.22
VENTANA ALTA -1 28.80 0.85 -24.48
VENTANA BAJA -1 25.29 1.65 -41.73
VENTANA BAJA -1 2.70 1.95 -5.27
PUERTA -3 1.10 2.10 -6.93
VACIO ESCAL -1 2.70 3.25 -8.78
0.00
PABELLON P-2 MURO EXT 1 107.73 3.25 350.12
MURO EXT 1 57.95 0.25 14.49
VENTANA ALTA -1 32.30 0.85 -27.46
VENTANA BAJA -1 27.84 1.65 -45.94
VENTANA BAJA -1 2.00 1.95 -3.90
PUERTA -2 1.10 2.10 -4.62
PUERTA -6 1.00 2.10 -12.60
VACIO ESCAL -1 2.70 3.25 -8.78
0.00
PABELLON I-1 MURO EXT 1 70.97 3.25 230.65
MURO EXT 1 42.05 0.25 10.51
VENTANA ALTA -1 24.72 0.85 -21.01
VENTANA BAJA -4 4.15 1.65 -27.39
VENTANA BAJA -1 2.00 1.95 -3.90
PUERTA -2 1.10 2.10 -4.62
PUERTA -2 0.90 2.10 -3.78
VACIO ESCAL -1 2.70 3.25 -8.78
0.00
PABELLON AULA I-03 MURO EXT 1 38.83 4.80 186.38
MURO EXT 26.15 0.25 0.00
VENTANA ALTA -1 12.88 0.85 -10.95
VENTANA BAJA -1 7.82 1.65 -12.90
PUERTA -1 1.10 2.10 -2.31
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA : “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA,
DISTRITO DE PIURA, PROVINCIA DE PIURA -PIURA''
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
0.00
PABELLON S-3 MURO EXT 1 72.10 3.25 234.33
MURO EXT 1 14.65 0.25 3.66
VENTANA ALTA -1 30.25 0.85 -25.71
VENTANA BAJA -1 2.00 1.95 -3.90
PUERTA -4 1.00 2.10 -8.40
VACIO ESCAL -1 2.70 3.25 -8.78
0.00
PABELLON S-4 MURO EXT 1 61.31 3.25 199.26
MURO EXT 1 37.15 0.25 9.29
VENTANA ALTA -1 15.94 0.85 -13.55
VENTANA BAJA -1 16.35 1.65 -26.98
VENTANA BAJA -1 2.00 1.95 -3.90
PUERTA -2 1.10 2.10 -4.62
VACIO ESCAL -1 2.70 3.25 -8.78
0.00
SEGUNDO PISO
PABELLON P-1 MURO EXT 1 82.99 3.25 269.72
MURO EXT 1 45.65 0.25 11.41
VENTANA ALTA -1 24.26 0.85 -20.62
VENTANA BAJA -1 24.66 1.65 -40.69
VENTANA BAJA -1 2.70 1.95 -5.27
PUERTA -3 1.10 2.10 -6.93
VACIO ESCAL -1 2.70 3.25 -8.78
MUROS BAJOS 1 40.25 2.40 96.60
0.00
PABELLON P-3 MURO EXT 1 84.78 3.25 275.54
MURO EXT 1 48.89 0.25 12.22
VENTANA ALTA -1 28.80 0.85 -24.48
VENTANA BAJA -1 25.29 1.65 -41.73
VENTANA BAJA -1 2.70 1.95 -5.27
PUERTA -3 1.10 2.10 -6.93
VACIO ESCAL -1 2.70 3.25 -8.78
MUROS BAJOS 1 36.05 2.40 86.52
0.00
PABELLON P-2 MURO EXT 1 102.19 3.25 332.12
MURO EXT 1 57.60 0.25 14.40
VENTANA ALTA -1 30.79 0.85 -26.17
VENTANA BAJA -1 33.49 1.65 -55.26
VENTANA BAJA -1 2.00 1.95 -3.90
PUERTA -4 1.10 2.10 -9.24
VACIO ESCAL -1 2.70 3.25 -8.78
MUROS BAJOS 1 54.30 2.40 130.32
0.00
PABELLON I-1 MURO EXT 1 70.67 3.25 229.68
MURO EXT 1 42.05 0.25 10.51
MURO EXT 1 28.55 0.79 22.55
MURO EXT 2 6.75 0.55 7.43
VENTANA ALTA -1 24.72 0.85 -21.01
VENTANA BAJA -4 4.15 1.65 -27.39
VENTANA BAJA -1 2.00 1.95 -3.90
PUERTA -2 1.10 2.10 -4.62
PUERTA -2 0.80 2.10 -3.36
VACIO ESCAL -1 2.70 3.25 -8.78
MUROS BAJOS 1 32.13 2.40 77.11
0.00
PABELLON S-3 MURO EXT 1 72.10 3.25 234.33
MURO EXT 1 37.15 0.25 9.29
VENTANA ALTA -1 30.25 0.85 -25.71
VENTANA BAJA -1 2.00 1.95 -3.90
PUERTA -4 1.00 2.10 -8.40
VACIO ESCAL -1 2.70 3.25 -8.78
MUROS BAJOS 1 27.65 2.40 66.36
0.00
PABELLON S-4 MURO EXT 1 61.25 3.25 199.06
MURO EXT 1 37.15 0.25 9.29
VENTANA ALTA -1 16.04 0.85 -13.63
VENTANA BAJA -1 16.35 1.65 -26.98
VENTANA BAJA -1 2.00 1.95 -3.90
PUERTA -3 1.10 2.10 -6.93
VACIO ESCAL -1 2.70 3.25 -8.78
MUROS BAJOS 1 27.65 2.40 66.36
0.00
TERCER PISO
PABELLON P-1 MURO EXT 1 82.99 3.25 269.72
MURO EXT 1 45.65 0.25 11.41
MURO EXT 1 34.30 0.79 27.10
MURO EXT 2 6.55 0.55 7.21
VENTANA ALTA -1 24.26 0.85 -20.62
VENTANA BAJA -1 24.66 1.65 -40.69
VENTANA BAJA -1 2.70 1.95 -5.27
PUERTA -3 1.10 2.10 -6.93
VACIO ESCAL -1 2.70 3.25 -8.78
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA : “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA,
DISTRITO DE PIURA, PROVINCIA DE PIURA -PIURA''
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
MUROS BAJOS 1 40.25 2.40 96.60
0.00
PABELLON P-3 MURO EXT 1 84.78 3.25 275.54
MURO EXT 1 48.89 0.25 12.22
MURO EXT 1 35.80 0.79 28.28
MURO EXT 2 6.55 0.55 7.21
VENTANA ALTA -1 27.80 0.85 -23.63
VENTANA BAJA -1 27.82 1.65 -45.90
VENTANA BAJA -1 2.70 1.95 -5.27
PUERTA -3 1.10 2.10 -6.93
VACIO ESCAL -1 2.70 3.25 -8.78
MUROS BAJOS 1 36.05 2.40 86.52
0.00
PABELLON P-2 MURO EXT 1 102.19 3.25 332.12
MURO EXT 1 57.60 0.25 14.40
MURO EXT 1 44.50 0.79 35.16
MURO EXT 2 6.55 0.55 7.21
VENTANA ALTA -1 30.79 0.85 -26.17
VENTANA BAJA -1 33.49 1.65 -55.26
VENTANA BAJA -1 2.00 1.95 -3.90
PUERTA -4 1.10 2.10 -9.24
VACIO ESCAL -1 2.70 3.25 -8.78
MUROS BAJOS 1 54.30 2.40 130.32
0.00
PABELLON S-3 MURO EXT 1 72.10 3.25 234.33
MURO EXT 1 37.15 0.25 9.29
MURO EXT 1 24.05 0.79 19.00
MURO EXT 2 6.55 0.55 7.21
VENTANA ALTA -1 15.96 0.85 -13.57
VENTANA BAJA -1 15.97 1.65 -26.35
VENTANA BAJA -1 2.00 1.95 -3.90
PUERTA -3 1.10 2.10 -6.93
VACIO ESCAL -1 2.70 3.25 -8.78
MUROS BAJOS 1 27.65 2.40 66.36
0.00
PABELLON S-4 MURO EXT 1 61.25 3.25 199.06
MURO EXT 1 37.15 0.25 9.29
MURO EXT 1 24.05 0.79 19.00
MURO EXT 2 6.55 0.55 7.21
VENTANA ALTA -1 16.04 0.85 -13.63
VENTANA BAJA -1 16.35 1.65 -26.98
VENTANA BAJA -1 2.00 1.95 -3.90
PUERTA -3 1.10 2.10 -6.93
VACIO ESCAL -1 2.70 3.25 -8.78
MUROS BAJOS 1 27.65 2.40 66.36
0.00
TOTAL 4628.69
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
TOTAL 416.90
PABELLON S-3
1 2.20 3.25 7.15
3 3.40 3.25 33.15
1 2.10 3.25 6.83
PABELLON S-2
10 0.45 3.25 14.63
4 1.70 3.25 22.10
2°PISO PABELLON P-01
11 0.45 3.25 16.09
6 1.70 3.25 33.15
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
6 0.45 2.50 6.75
TOTAL 1049.73
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
2° PIISO AULA P-09 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
2° PIISO AULA P-10 1 6.05 1.05 6.35
4 4.88 0.85 16.58
2 1.95 0.65 2.54
2° PIISO AULA 11 2 6.05 1.05 12.71
2 11.00 0.85 18.70
4 1.95 0.65 5.07
PABELLON P-02
2° PIISO AULA P-12 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
2° PIISO AULA 13 1 6.05 1.05 6.35
4 4.88 0.85 16.58
2 1.95 0.65 2.54
2° PIISO LABORATORIO 3 6.05 1.05 19.06
8 4.88 0.85 33.15
5 1.95 0.65 6.34
PABELLON I-1
2° PIISO AULA PSICOMOTRIZ 1 6.05 1.05 6.35
4 4.88 0.85 16.59
4 1.95 0.65 5.07
2° PIISO AULA I-04 1 6.05 1.05 6.35
4 4.88 0.85 16.59
3 1.95 0.65 3.80
2° PIISO SS.HH. 2 4.30 0.85 7.31
PABELLON S-3
2° PIISO AULA DE INNOVACION 2 6.05 1.05 12.71
1 6.05 0.50 3.03
2 22.40 0.85 38.08
6 1.95 0.65 7.61
PABELLON S-2
2° PIISO AULA S-10 2 6.05 0.65 7.87
4 4.88 0.85 16.58
3 1.95 0.65 3.80
2° PIISO AULA S-11 1 6.05 0.65 3.93
4 4.88 0.85 16.58
3 1.95 0.65 3.80
TERCER PISO
PABELLON P-01
3ERR PISO AULA P-14 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
3ERR PISO AULA P-15 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
3ERR PISO AULA P-16 1 6.05 1.05 6.35
4 4.88 0.85 16.58
2 1.95 0.65 2.54
PABELLON P-03
3ERR PISO AULA P-17 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
3ERR PISO AULA P-18 1 6.05 1.05 6.35
4 4.88 0.85 16.58
2 1.95 0.65 2.54
3ERR PISO AULA 19 2 6.05 1.05 12.71
2 11.00 0.85 18.70
4 1.95 0.65 5.07
PABELLON P-02
3ERR PISO BIBLIOTECA 2 6.05 1.05 12.71
6 4.88 0.85 24.86
5 1.95 0.65 6.34
3ERR PISO DEPOSITO 1 6.05 1.05 6.35
2 4.88 0.85 8.29
3ERR PISO AULA DCE INNOVACION 2 6.05 1.05 12.71
8 4.88 0.85 33.15
5 1.95 0.65 6.34
1 6.05 0.55 3.33
PABELLON S-3
3ERR PISO AULA DE INNOVACION 2 6.05 1.05 12.71
1 6.05 0.55 3.33
2 22.40 0.85 38.08
6 1.95 0.65 7.61
PABELLON S-2
3ERR PISO AULA S-12 1 6.05 0.65 3.93
4 4.88 0.85 16.58
3 1.95 0.65 3.80
3ERR PISO AULA S-13 1 6.05 0.65 3.93
4 4.88 0.85 16.58
3 1.95 0.65 3.80
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA : “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA,
DISTRITO DE PIURA, PROVINCIA DE PIURA -PIURA''
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
TOTAL 1399.59
TOTAL 78.44
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
PUERTA 2 2.10 4.20
0.00
COCINA - ALMACEN VENTANA BAJA 1 4.05 1.65 7.35
VENTANA ALTA 1 4.05 0.85 5.75
VENTANA ALTA 1 2.00 1.65 5.30
PUERTA 2 2.10 4.20
PABELLON P-02 0.00
AULA I-01 VENTANA BAJA 2 4.15 1.65 14.90
VENTANA ALTA 2 4.15 0.85 11.70
PUERTA 1 2.10 2.10
0.00
SS. HH-. NIÑOS - DEPOSITOS VENTANA ALTA 4 2.03 0.85 14.92
PUERTA 4 2.10 8.40
PABELLON I-1 0.00
AULA I-02 VENTANA BAJA 2 4.15 1.65 14.90
VENTANA ALTA 2 4.15 0.85 11.70
PUERTA 1 2.10 2.10
0.00
SS. HH. NIÑOS NIÑAS VENTANA ALTA 2 1.90 0.85 7.20
VENTANA ALTA 1 1.25 0.85 2.95
PUERTA 3 2.10 6.30
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
AULA P-12 VENTANA BAJA 1 4.43 1.65 7.74
VENTANA BAJA 1 4.57 1.65 7.87
VENTANA ALTA 1 4.43 0.85 6.13
VENTANA ALTA 1 4.57 0.85 6.27
PUERTA 1 2.10 2.10
0.00
AULA P-13 VENTANA BAJA 1 4.43 1.65 7.74
VENTANA BAJA 1 4.57 1.65 7.87
VENTANA ALTA 1 4.43 0.85 6.13
VENTANA ALTA 1 4.57 0.85 6.27
PUERTA 1 2.10 2.10
0.00
LABORATORIO VENTANA BAJA 4 4.43 1.65 30.92
VENTANA ALTA 4 4.43 0.85 24.52
PUERTA 2 2.10 4.20
0.00
PABELLON I-1 0.00
AULA PSICOMOTRIZ VENTANA BAJA 2 4.15 1.65 14.90
VENTANA ALTA 2 4.15 0.85 11.70
PUERTA 1 2.10 2.10
0.00
SS. HH-. NIÑOS - DEPOSITOS VENTANA ALTA 4 2.03 0.85 14.92
PUERTA 4 2.10 8.40
0.00
AULA I-04 VENTANA BAJA 2 4.15 1.65 14.90
VENTANA ALTA 2 4.15 0.85 11.70
PUERTA 1 2.10 2.10
0.00
PABELLON S-3 0.00
AULA DE INNOVACION VENTANA BAJA 1 4.05 1.65 7.35
VENTANA BAJA 1 3.93 1.65 7.23
VENTANA ALTA 1 4.05 0.85 5.75
VENTANA ALTA 1 3.93 0.85 5.63
PUERTA 2 2.10 4.20
0.00
DEPOSITO TIC VENTANA ALTA 1 3.93 0.85 5.63
VENTANA BAJA 1 3.93 0.85 5.63
PUERTA 1 2.10 2.10
0.00
AREA DE CONECTIVIDAD VENTANA BAJA 1 4.05 1.65 7.35
VENTANA ALTA 1 4.05 0.85 5.75
PUERTA 1 2.10 2.10
0.00
PABELLON S-2 0.00
AULA S-10 VENTANA BAJA 2 4.05 1.65 14.70
VENTANA ALTA 1 4.05 0.85 5.75
VENTANA ALTA 1 3.92 0.85 5.62
PUERTA 1 2.10 2.10
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
PUERTA 1 2.10 2.10
0.00
AULA P-19 VENTANA ALTA 1 2.90 0.85 4.60
VENTANA ALTA 1 2.81 0.85 4.51
VENTANA ALTA 1 3.08 0.85 4.78
VENTANA BAJA 1 2.95 1.65 6.25
VENTANA BAJA 1 2.90 1.65 6.20
VENTANA BAJA 1 3.08 1.65 6.38
PUERTA 1 2.10 2.10
PABELLON P-02 0.00
BIBLIOTECA VENTANA BAJA 1 4.43 1.65 7.74
VENTANA BAJA 2 4.58 1.65 15.76
VENTANA ALTA 1 4.43 0.85 6.13
VENTANA ALTA 2 4.58 0.85 12.56
PUERTA 2 2.10 4.20
0.00
DEPOSITO VENTANA BAJA 1 4.43 1.65 7.74
VENTANA ALTA 1 4.43 0.85 6.13
PUERTA 1 2.10 2.10
0.00
AREWA DE CONECTIVIDAD VENTANA BAJA 1 4.43 1.65 7.73
VENTANA ALTA 1 4.43 0.85 6.13
PUERTA 1 2.10 2.10
0.00
AULA DE INNOVACION VENTANA BAJA 2 4.58 1.65 15.76
VENTANA BAJA 1 4.43 1.65 7.73
VENTANA ALTA 1 4.43 0.85 6.13
VENTANA ALTA 2 4.58 0.85 12.56
PUERTA 3 2.10 6.30
0.00
PABELLON S-3 0.00
AULA DE INNOVACION VENTANA BAJA 1 4.05 1.65 7.35
VENTANA BAJA 1 3.93 1.65 7.23
VENTANA ALTA 1 4.05 0.85 5.75
VENTANA ALTA 1 3.93 0.85 5.63
PUERTA 2 2.10 4.20
0.00
DEPOSITO TIC VENTANA ALTA 1 3.93 1.65 7.23
VENTANA BAJA 1 3.93 0.85 5.63
PUERTA 1 2.10 2.10
0.00
AREA DE CONECTIVIDAD VENTANA BAJA 1 4.05 1.65 7.35
VENTANA ALTA 1 4.05 0.85 5.75
PUERTA 1 2.10 2.10
0.00
PABELLON S-2 0.00
AULA S-12 VENTANA BAJA 1 4.42 1.65 7.72
VENTANA ALTA 1 4.57 1.65 7.87
VENTANA ALTA 1 4.42 0.85 6.12
VENTANA ALTA 1 4.57 0.85 6.27
PUERTA 1 2.10 2.10
1450.84
PRIMER PISO
PABELLON P-01
AULA P-01 MURO AP-01 AC-01 1 34.17 34.17
PUERTA -1 1.10 -1.10
PABELLON I-01
ESCALERA MURO 1 15.90 15.90
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA : “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA,
DISTRITO DE PIURA, PROVINCIA DE PIURA -PIURA''
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
PABELLON P-03
AULA P-04 MURO AP - 04 AC-01 1 33.80 33.80
PUERTA -1 1.10 -1.10
PABELLON P-02
SS. HH. NIÑOS MURO SHV-01 AC-03 1 30.10 30.10
PUERTA -1 1.00 -1.00
PABELLON S-03
SS.HH NIÑOS MURO SHV-02 AC-03 1 21.05 21.05
PUERTA -1 1.00 -1.00
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
0.00
SS.HH NIÑAS MURO SHV-02 AC-03 1 21.45 21.45
PUERTA -1 1.00 -1.00
SEGUNDO PISO
PABELLON P-01
AULA P-06 MURO AP-06 AC-01 1 34.17 34.17
PUERTA -1 1.10 -1.10
PABELLON P-03
AULA P-09 MURO AP - 09 AC-01 1 34.17 34.17
PUERTA -1 1.10 -1.10
PABELLON P-02
AULA P-12 MURO AP-12 AC-01 1 33.77 33.77
PUERTA -1 1.10 -1.10
PABELLON I-01
AULA PSICOMOTRIZ MURO PSI-01 AC-01 1 34.70 34.70
PUERTA -1 1.10 -1.10
PABELLON S-3
AULA INNOVACION MURO INN-01 AC-01 1 41.24 41.24
PUERTA -2 1.10 -2.20
PUERTA -1 1.00 -1.00
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
AREA DE CONECTIVIDAD MURO ARC-01 AC-01 1 22.52 22.52
PUERTA -1 1.10 -1.10
0.00
ESCALERA MURO 1 15.90 15.90
PABELLON S-2
ESCALERA MURO 1 15.90 15.90
TERCER PISO
PABELLON P-01
AULA P-14 MURO AP-14 AC-01 1 34.17 34.17
PUERTA -1 1.10 -1.10
PABELLON P-03
AULA P-17 MURO AP - 17 AC-01 1 34.17 34.17
PUERTA -1 1.10 -1.10
PABELLON P-02
BIBLIOTECA MURO 1 45.64 45.64
PUERTA -2 1.10 -2.20
PUERTA -1 0.90 -0.90
PABELLON S-03
AULA INNOVACION MURO INN-01 AC-01 1 41.24 41.24
PUERTA -2 1.10 -2.20
PUERTA -1 1.00 -1.00
PABELLON S-2
ESCALERA MURO 1 15.90 15.90
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
AULA P-02 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-03 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-04 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-05 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
SALA DE ADMINISTRATIVO ENTRE COLY 12 1.30 15.60
10 2.10 21.00
SS.HH. NIÑOS Y NIÑAS ENTRE COLY 8 2.95 23.60
24 2.10 50.40
SUM COCINA ENTRE COLY 16 1.30 20.80
12 2.10 25.20
2 2.95 5.90
PABELLON I-01 ENTRE COLY 16 1.30 20.80
20 2.10 42.00
2 2.95 5.90
AULA I-03 ENTRE COLY 8 1.30 10.40
14 2.10 29.40
2 3.25 6.50
PABELLON S-3 ENTRE COLY 0 0.00
10 2.10 21.00
PABELLON S-2 ENTRE COLY 16 1.30 20.80
12 2.10 25.20
SEGUNDO
AULA P-06 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-07 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-08 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-09 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-10 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-11 ENTRE COLY 12 1.30 15.60
12 2.10 25.20
AULA P-12 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-13 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
LABOARATORIO ENTRE COLY 16 1.30 20.80
12 2.10 25.20
PABELLON I-01 ENTRE COLY 16 1.30 20.80
20 2.10 42.00
4 2.95 11.80
PABELLON S-3 ENTRE COLY 26 2.10 54.60
0.00
PABELLON S-2 ENTRE COLY 16 1.30 20.80
12 2.10 25.20
TERCER PISO
AULA P-14 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-15 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-16 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-17 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-18 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-19 ENTRE COLY 12 1.30 15.60
10 2.10 21.00
BIBLIOTECA ENTRE COLY 12 1.30 15.60
8 2.10 16.80
DEPOSITO ENTRE COLY 4 1.30 5.20
4 2.10 8.40
AREA DE CONECTIV ENTRE COLY 16 1.30 20.80
16 2.10 33.60
PABELLON S-3 ENTRE COLY 26 2.10 54.60
0.00
PABELLON S-2 ENTRE COLY 16 1.30 20.80
12 2.10 25.20
BRUÑAS EN MUROS EXTERIORESPABELLON P-01 2 46.32 92.64
PABELLON P-02 2 46.32 92.64
PABELLON S-3 PABELLON P-03 2 46.32 92.64
PABELLON I-1 2 29.22 58.44
PABELLON S-2 PABELLON I-I 2 16.50 33.00
PABELLON S-3 2 46.32 92.64
PABELLON S-2 2 46.32 92.64
ML 3786.75
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA : “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA,
DISTRITO DE PIURA, PROVINCIA DE PIURA -PIURA''
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
TOTAL M 3786.75
TOTAL 232.60
TOTAL 91.14
TOTAL 30.77
TOTAL 136.42
02.02.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
ESCALERA PABELLON P-03 1 2.7 1.99 5.37
TARRAJEO EN FONDO DE DESCANSO 1 2.7 1.60 4.32
DESCANSO MEDIO 1 2.83 1.23 3.48
1 3.18 1.23 3.91
TARRAJEO DE PARED 1 3.75 2.85 10.69
SEGUNDO PISO PABELLON P-03 1 2.675 1.00 2.68
1 2.7 1.99 5.37
TARRAJEO EN FONDO DE DESCANSO 1 2.7 1.60 4.32
DESCANSO MEDIO 1 2.83 1.23 3.48
1 3.18 1.23 3.91
TARRAJEO DE PARED 1 3.75 2.85 10.69
1 2.675 1.00 2.68
ESCALERA PABELLON I-1 1 2.7 1.99 5.37
TARRAJEO EN FONDO DE DESCANSO 1 2.7 1.60 4.32
DESCANSO MEDIO 1 2.83 1.23 3.48
1 3.18 1.23 3.91
TARRAJEO DE PARED 1 3.75 2.85 10.69
ESCALERA PABELLON S-03 1 2.7 1.99 5.37
TARRAJEO EN FONDO DE DESCANSO 1 2.7 1.60 4.32
DESCANSO MEDIO 1 2.83 1.23 3.48
1 3.18 1.23 3.91
TARRAJEO DE PARED 1 3.75 2.85 10.69
SEGUNDO PISO PABELLON S-03 1 2.675 1.00 2.68
1 2.7 1.99 5.37
TARRAJEO EN FONDO DE DESCANSO 1 2.7 1.60 4.32
DESCANSO MEDIO 1 2.83 1.23 3.48
1 3.18 1.23 3.91
TARRAJEO DE PARED 1 3.75 2.85 10.69
1 2.675 1.00 2.68
ESCALERA PABELLON S-02 1 2.7 1.99 5.37
TARRAJEO EN FONDO DE DESCANSO 1 2.7 1.60 4.32
DESCANSO MEDIO 1 2.83 1.23 3.48
1 3.18 1.23 3.91
TARRAJEO DE PARED 1 3.75 2.85 10.69
SEGUNDO PISO PABELLON S-02 1 2.675 1.00 2.68
1 2.7 1.99 5.37
TARRAJEO EN FONDO DE DESCANSO 1 2.7 1.60 4.32
DESCANSO MEDIO 1 2.83 1.23 3.48
1 3.18 1.23 3.91
TARRAJEO DE PARED 1 3.75 2.85 10.69
1 2.675 1.00 2.68
TOTAL 332.25
TOTAL 541.20
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
PARTIDA: CIELORASO
AREA
PRIMER PISO
PABELLON P-1
AULA P-01 1 62.18 62.18
0.00
AULA P-02 1 62.13 62.13
0.00
AULA P-03 1 62.15 62.15
0.00
ALERO DE PASILLO 1 78.48 78.48
0.00
PABELLON P-3
AULA P-04 1 62.15 62.15
0.00
AULA P-05 1 62.13 62.13
0.00
AREA ADMINISTRATIVA 1 71.21 71.21
0.00
ALERO DE PASILLO 1 70.30 70.30
0.00
PABELLON P-2
SS.HH. M 1 10.88 10.88
0.00
SS. HH. H 1 10.88 10.88
0.00
SS. HH. NIÑAS 1 28.94 28.94
0.00
SS. HH. DISC 1 6.43 6.43
0.00
SS. HH. DISC 1 6.43 6.43
0.00
SSHH NIÑOS 1 29.54 29.54
0.00
SUM 1 96.13 96.13
0.00
COCINA 1 19.84 19.84
0.00
ALMACEN 1 10.51 10.51
0.00
ALERO DE PASILLO 1 95.18 95.18
0.00
CIELO RASO DETRÁS DE LOOS SERVICIOS HIGIENICOS 1 46.79 46.79
0.00
PABELLON I-1
AIULA I-01 1 64.36 64.36
0.00
SS. HH. NIÑOS 1 10.09 10.09
0.00
SS. HH. NIÑAS 1 10.09 10.09
0.00
DEPOSITO 2 2.88 5.76
0.00
AULA MI-025 1 64.24 64.24
0.00
SS. HH. NIÑOS 1 6.05 6.05
0.00
SS. HH. NIÑAS 1 4.21 4.21
0.00
DEPOSITO 1 2.71 2.71
0.00
AULA I-03 1 63.34 63.34
0.00
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
PARTIDA: CIELORASO
PARTIDA: CIELORASO
PARTIDA: CIELORASO
id PISO Nº
DESCRIPCION VECES
AREA PARCIAL TOTAL
id PISO DESCRIPCION TIPO VANO CODIGO ACABADO Nº VECES AREA PARCIAL TOTAL
02.04.01 CONTRAPISO DE 40 mm
PRIMER PISO 0.00
PABELLON P-1
AULA P-01 AP-01 AC-01 1 62.18 62.18
0.00
AULA P-02 AP-02 AC-01 1 62.13 62.13
0.00
AULA P-03 AP-03 AC-01 1 62.15 62.15
0.00
PABELLON P-3
AULA P-04 AP-04 AC-01 1 62.15 62.15
0.00
AULA P-05 AP-05 AC-01 1 62.13 62.13
0.00
AREA ADMINISTRATIVA ADM-01 AC-01 1 71.21 71.21
0.00
PABELLON P-2
SS.HH. M SHP-02 AC-03 1 10.88 10.88
0.00
SS. HH. H SHP-01 AC-03 1 10.88 10.88
0.00
SS. HH. NIÑAS SHM-01 AC-03 1 28.94 28.94
0.00
SS. HH. DISC SHD-01 AC-03 1 6.43 6.43
0.00
SS. HH. DISC SHD-02 AC-03 1 6.43 6.43
0.00
SSHH NIÑOS SHV-01 AC-01 1 28.49 28.49
0.00
SUM SUM AC-01 1 96.13 96.13
0.00
COCINA CO-01 AC-03 1 19.84 19.84
0.00
ALMACEN CO-02 AC-03 1 10.51 10.51
0.00
PABELLON I-1
SS. HH. NIÑOS SHN-01 AC-03 1 10.09 10.09
0.00
SS. HH. NIÑAS SHN-02 AC-03 1 10.09 10.09
0.00
SS. HH. NIÑOS SHN-03 AC-03 1 5.89 5.89
0.00
SS. HH. NIÑAS SHN-04 AC-03 1 4.11 4.11
0.00
PABELLON S-3
SS.HH. NIÑOS SHV-01 AC-03 1 22.28 22.28
0.00
SS. HH. DISC SHD-03 AC-03 1 7.71 7.71
0.00
SS. HH. DISC SHD-04 AC-03 1 7.71 7.71
0.00
SS. HH. NIÑAS SHM-02 AC-03 1 22.23 22.23
0.00
PABELLON S-2
AULA S-04 AS-04 AC-01 1 62.13 62.13
0.00
AULA S-05 AS-05 AC-01 1 62.10 62.10
0.00
SEGUNDO PISO 0.00
PABELLON P-01
AULA P-06 AP-06 AC-01 1 62.18 62.18
0.00
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA : “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA,
DISTRITO DE PIURA, PROVINCIA DE PIURA -PIURA''
id PISO Nº
DESCRIPCION VECES
AREA PARCIAL TOTAL
id PISO DESCRIPCION TIPO VANO CODIGO ACABADO Nº VECES AREA PARCIAL TOTAL
AULA P-07 AP-07 AC-01 1 62.13 62.13
0.00
AULA P-08 AP-08 AC-01 1 62.15 62.15
0.00
PABELLON P-3
AULA P-09 AP-09 AC-01 1 62.15 62.15
0.00
AULA P-10 AP-10 AC-01 1 62.13 62.13
0.00
AULA P-11 AP-11 AC-01 1 71.21 71.21
0.00
PABELLON P-2
AULA P-12 AP-12 AC-01 1 62.37 62.37
0.00
AULA P-13 AP-13 AC-01 1 62.37 62.37
0.00
LABORATORIO LAB-01 AC-01 1 126.18 126.18
0.00
PABELLON I-1
AIULA PSICOMOTRIZ PSI-01 AC-01 1 64.23 64.23
0.00
SS. HH. NIÑOS SHN-01 AC-03 1 9.81 9.81
0.00
SS. HH. NIÑAS SHN-02 AC-03 1 9.80 9.80
0.00
PABELLON S-3
AULA INNOVACION INN-01 AC-01 1 78.41 78.41
0.00
DEPOSITO TIC TIC-01 AC-01 1 15.29 15.29
0.00
AREA DE CONECTIVIDAD ARC-01 AC-01 1 30.45 30.45
0.00
PABELLON S-2
AULA S-10 AS-10 AC-01 1 62.14 62.14
0.00
AULA S-11 AS-11 AC-01 1 62.16 62.16
0.00
TERCER PISO 0.00
PABELLON P-01
AULA P-14 AP-14 AC-01 1 62.18 62.18
0.00
AULA P-15 AP-15 AC-01 1 62.13 62.13
0.00
AULA P-16 AP-16 AC-01 1 62.15 62.15
0.00
PABELLON P-3
AULA P-17 AP-17 AC-01 1 62.15 62.15
0.00
AULA P-18 AP-18 AC-01 1 62.13 62.13
0.00
AULA P-19 AP-19 AC-01 1 71.21 71.21
0.00
PABELLON P-2
BIBLIOTECA BIB-01 AC-01 1 95.02 95.02
0.00
AREA DE CONECTIVIDAD ARC-03 AC-01 1 30.53 30.53
0.00
DEPOSITO TIC TIC-03 AC-01 1 15.37 15.37
0.00
AULA DE INNOVACION INN-03 AC-01 1 78.78 78.78
0.00
PABELLON S-3
AULA INNOVACION INN-02 AC-01 1 78.41 78.41
0.00
DEPOSITO TIC TIC-02 AC-01 1 15.29 15.29
0.00
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA : “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA,
DISTRITO DE PIURA, PROVINCIA DE PIURA -PIURA''
id PISO Nº
DESCRIPCION VECES
AREA PARCIAL TOTAL
id PISO DESCRIPCION TIPO VANO CODIGO ACABADO Nº VECES AREA PARCIAL TOTAL
AREA DE CONECTIVIDAD ARC-02 AC-01 1 30.45 30.45
0.00
PABELLON S-2
AULA S-12 AS-12 AC-01 1 62.14 62.14
0.00
AULA S-13 AS-13 AC-01 1 62.16 62.16
0.00
TOTAL 2630.08
02.04.02 CONTRAPISO DE 48 mm
id PISO Nº
DESCRIPCION VECES
AREA PARCIAL TOTAL
id PISO DESCRIPCION TIPO VANO CODIGO ACABADO Nº VECES AREA PARCIAL TOTAL
ALERO DE PASILLO AC-04 1 42.75 42.75
0.00
TOTAL 1017.44
id PISO Nº
DESCRIPCION VECES
AREA PARCIAL TOTAL
id PISO DESCRIPCION TIPO VANO CODIGO ACABADO Nº VECES AREA PARCIAL TOTAL
AULA P-06 AP-06 AC-01 1 62.18 62.18
0.00
AULA P-07 AP-07 AC-01 1 62.13 62.13
0.00
AULA P-08 AP-08 AC-01 1 62.15 62.15
0.00
PABELLON P-3
AULA P-09 AP-09 AC-01 1 62.15 62.15
0.00
AULA P-10 AP-10 AC-01 1 62.13 62.13
0.00
AULA P-11 AP-11 AC-01 1 71.21 71.21
0.00
PABELLON P-2
AULA P-12 AP-12 AC-01 1 62.37 62.37
0.00
AULA P-13 AP-13 AC-01 1 62.37 62.37
0.00
LABORATORIO LAB-01 AC-01 1 126.18 126.18
0.00
PABELLON I-1
AIULA PSICOMOTRIZ PSI-01 AC-01 1 64.23 64.23
0.00
SS. HH. NIÑOS SHN-01 AC-03 1 9.81 9.81
0.00
SS. HH. NIÑAS SHN-02 AC-03 1 9.80 9.80
0.00
PABELLON S-3
AULA INNOVACION INN-01 AC-01 1 78.41 78.41
0.00
DEPOSITO TIC TIC-01 AC-01 1 15.29 15.29
0.00
AREA DE CONECTIVIDAD ARC-01 AC-01 1 30.45 30.45
0.00
PABELLON S-2
AULA S-10 AS-10 AC-01 1 62.14 62.14
0.00
AULA S-11 AS-11 AC-01 1 62.16 62.16
0.00
TERCER PISO 0.00
PABELLON P-01
AULA P-14 AP-14 AC-01 1 62.18 62.18
0.00
AULA P-15 AP-15 AC-01 1 62.13 62.13
0.00
AULA P-16 AP-16 AC-01 1 62.15 62.15
0.00
PABELLON P-3
AULA P-17 AP-17 AC-01 1 62.15 62.15
0.00
AULA P-18 AP-18 AC-01 1 62.13 62.13
0.00
AULA P-19 AP-19 AC-01 1 71.21 71.21
0.00
PABELLON P-2
BIBLIOTECA BIB-01 AC-01 1 95.02 95.02
0.00
AREA DE CONECTIVIDAD ARC-03 AC-01 1 30.53 30.53
0.00
DEPOSITO TIC TIC-03 AC-01 1 15.37 15.37
0.00
AULA DE INNOVACION INN-03 AC-01 1 78.78 78.78
0.00
PABELLON S-3
AULA INNOVACION INN-02 AC-01 1 78.41 78.41
0.00
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA : “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA,
DISTRITO DE PIURA, PROVINCIA DE PIURA -PIURA''
id PISO Nº
DESCRIPCION VECES
AREA PARCIAL TOTAL
id PISO DESCRIPCION TIPO VANO CODIGO ACABADO Nº VECES AREA PARCIAL TOTAL
DEPOSITO TIC TIC-02 AC-01 1 15.29 15.29
0.00
AREA DE CONECTIVIDAD ARC-02 AC-01 1 30.45 30.45
0.00
PABELLON S-2
AULA S-12 AS-12 AC-01 1 62.14 62.14
0.00
AULA S-13 AS-13 AC-01 1 62.16 62.16
0.00
TOTAL 2630.08
PRIMER PISO
PABELLON I-1
AIULA I-01 AI-01 AC-02 1 64.36 64.36
0.00
AULA MI-025 AI-01 AC-02 1 64.24 64.24
0.00
AULA I-03 AI-03 AC-02 1 63.34 63.34
0.00
SEGUNDO PISO 0.00
AULA I-04 AI-04 AC-02 1 64.23 64.23
0.00
TOTAL 256.17
0.00
02.04.05 PISO DE CONCRETO SIN COLOREAR e=5" (BRUÑADO)
id PISO Nº
DESCRIPCION VECES
AREA PARCIAL TOTAL
id PISO DESCRIPCION TIPO VANO CODIGO ACABADO Nº VECES AREA PARCIAL TOTAL
0.00
PABELLON P-2
DEPOSITO AC-04 1 30.45 30.45
0.00
ALERO DE PASILLO AC-04 1 87.39 87.39
0.00
PABELLON S-3
ALERO DE PASILLO AC-04 1 42.75 42.75
0.00
PABELLON S-2
ALERO DE PASILLO AC-04 1 42.75 42.75
0.00
TOTAL(M2)
02.04.07 VEREDAS e=4" DE CONCRETO f'c=175kg/cm2 ACABADO PULIDO Y BRUÑADO
TOTAL 622.74
02.04.08 RAMPAS e=4" DE CONCRETO f'c=175kg/cm2 ACABADO PULIDO Y BRUÑADO (INCLUYE SARD
TOTAL 52.82
id PISO Nº
DESCRIPCION VECES
AREA PARCIAL TOTAL
id PISO DESCRIPCION TIPO VANO CODIGO ACABADO Nº VECES AREA PARCIAL TOTAL
PABELLON 02 1 129.02 129.02
PABELLON 02 - CISTERNA 1 17.08 17.08
PABELLON I-1 1 67.89 67.89
PABELLON I-1 1 84.87 84.87
HALL 1 21.41 21.41
PABELLON S-3 1 64.39 64.39
PABELLON S-3 1 46.79 46.79
PABELLON S-2 1 46.87 46.87
PATIO INICIAL 1 198.41 198.41
PATIO DE PRIMARIA 1 128.45 128.45
PATIO PRIMARIA 1 103.13 103.13
1,052.7 0.10
TOTAL M2 207.75
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
OBRA: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
OBRA: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
M2 195.84
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA : “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA, PROVINCIA DE PIURA
-PIURA''
PARTIDA :SARDINELES
02.05.01 SARDINEL.-CONCRETO f'c=175 kg/cm2 (INC. EXCAVACION) EN AREAS VERDES DIMENSIONES UNIDAD M
ITEM PISO DESCRIPCION VANO CODIGO ACABADO
N° VECES L H PARCIAL TOTAL
TOTAL 108.65
TOTAL 32.60
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA, PROVINCIA DE
PIURA -PIURA''
PRIMER PISO
PABELLON P-01
AULA P-01 MURO AP-01 AC-01 1 34.17 ###
PUERTA -1 1.10 -1.10
PABELLON I-01
ESCALERA MURO 1 15.90 ###
PABELLON P-03
AULA P-04 MURO AP - 04 AC-01 1 33.80 ###
PUERTA -1 1.10 -1.10
PABELLON P-02
SUMM MURO 1 46.93 ###
PUERTA -2 1.10 -2.20
PABELLON S-03
PABELLON S-02
AULA S-04 MURO A5-04 AC-01 1 34.18 ###
PUERTA -1 1.10 -1.10
SEGUNDO PISO
PABELLON P-01
AULA P-06 MURO AP-06 AC-01 1 34.17 ###
PUERTA -1 1.10 -1.10
PABELLON P-03
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA, PROVINCIA DE
PIURA -PIURA''
PABELLON P-02
AULA P-12 MURO AP-12 AC-01 1 33.77 ###
PUERTA -1 1.10 -1.10
PABELLON I-01
AULA PSICOMOTRIZ MURO PSI-01 AC-01 1 34.70 ###
PUERTA -1 1.10 -1.10
PABELLON S-3
AULA INNOVACION MURO INN-01 AC-01 1 41.24 ###
PUERTA -2 1.10 -2.20
PUERTA -1 1.00 -1.00
TERCER PISO
PABELLON P-01
AULA P-14 MURO AP-14 AC-01 1 34.17 ###
PUERTA -1 1.10 -1.10
PABELLON P-03
AULA P-17 MURO AP - 17 AC-01 1 34.17 ###
PUERTA -1 1.10 -1.10
PABELLON P-02
BIBLIOTECA MURO 1 45.64 ###
PUERTA -2 1.10 -2.20
PUERTA -1 0.90 -0.90
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA, PROVINCIA DE
PIURA -PIURA''
PABELLON S-03
AULA INNOVACION MURO INN-01 AC-01 1 41.24 ###
PUERTA -2 1.10 -2.20
PUERTA -1 1.00 -1.00
ML
PRIMER PISO
PABELLON P-01
ESCALERA MURO 1 15.50 ###
PABELLON I-01
ESCALERA MURO 1 15.90 ###
PABELLON P-02
ESCALERA MURO 1 15.50 ###
PABELLON S-03
ESCALERA MURO 1 21.90 ###
0.00
PABELLON S-02
ESCALERA MURO 1 21.90 ###
0.00
SEGUNDO PISO
PABELLON P-01
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA, PROVINCIA DE
PIURA -PIURA''
PABELLON P-03
ESCALERA MURO 1 15.50 ###
PABELLON P-02
ESCALERA MURO 1 15.50 ###
PABELLON I-01
DEPOSITO MURO 1 7.12 7.12
PUERTA -1 0.80 -0.80
ALERO PASILLO 1 55.80 ###
PABELLON S-3
ESCALERA MURO 1 15.90 ###
PABELLON S-2
ESCALERA MURO 1 15.90 ###
TERCER PISO
PABELLON P-01
ESCALERA MURO 1 15.50 ###
PABELLON P-03
PABELLON P-02
DEPOSITO MURO 1 22.40 ###
PUERTA -1 0.90 -0.90
PABELLON S-03
ESCALERA MURO 1 15.90 ###
PABELLON S-2
ESCALERA MURO 1 15.90 ###
ALERO PASILLO 1 46.20 ###
ML
ML
ML
ML
PRIMER PISO
PABELLON I-01
SS.HH - NIÑOS MURO SHN - 01 AC-03 1 14.10 1.80 ###
PUERTA -1 0.90 1.80 -1.62
SS. H.. DISC MURO SHD -01 AC-03 1 10.27 1.80 ###
PUERTA -1 1.00 1.80 -1.80
PABELLON S-03
SS.HH NIÑOS MURO SHV-02 AC-03 1 21.05 1.80 ###
PUERTA -1 1.00 1.80 -1.80
SEGUNDO PISO
PABELLON I-01
SS. HH. NIÑOS MURO SHN - 01 AC-03 1 14.30 1.80 ###
PUERTA -1 0.90 1.80 -1.62
M2
TOTAL
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA, PROVINCIA DE PIURA -
PIURA''
id PISO
DESCRIPCION Nº VECES DIMENSIONES PARCIAL TOTAL
###
id PISO
DESCRIPCION Nº VECES DIMENSIONES PARCIAL TOTAL
BARANDA METALICA EN LOS EJES J-1, I-3, J-a SEGUNDO PSIO 1 8.00 8.00
BARANDA METALICA EN LOS EJES J-1, I-3, J-a TERCER PISO 1 8.00 8.00
###
PRIMER PISO
1°PISO PABELLON P-01 1 3.25 3.25
1°PISO PABELLON P-01 1 3.50 3.50
1°PISO PABELLON P-01 1 6.15 6.15
EJE J-a - J-1 2 3.25 6.50
1°PISO PABELLON P-03 1 3.25 3.25
1°PISO PABELLON P-03 1 3.50 3.50
1°PISO PABELLON P-03 1 6.15 6.15
1°PISO PABELLON P-02 2 3.25 6.50
1°PISO PABELLON P-02 2 3.50 7.00
1°PISO PABELLON P-02 2 6.15 12.30
1°PISO PABELLON I-01 1 3.25 3.25
1°PISO PABELLON I-01 1 3.50 3.50
1°PISO PABELLON I-01 1 6.15 6.15
1°PISO PABELLON S-3 1 3.25 3.25
1°PISO PABELLON S-3 1 3.50 3.50
1°PISO PABELLON S-3 1 6.15 6.15
1°PISO PABELLON S-2 1 3.25 3.25
1°PISO PABELLON S-2 1 3.50 3.50
1°PISO PABELLON S-2 1 6.15 6.15
SEGUNDO PISO
1°PISO PABELLON P-01 1 3.25 3.25
1°PISO PABELLON P-01 1 3.50 3.50
1°PISO PABELLON P-01 1 6.15 6.15
EJE J-a - J-1 2 3.25 6.50
1°PISO PABELLON P-03 1 3.25 3.25
1°PISO PABELLON P-03 1 3.50 3.50
1°PISO PABELLON P-03 1 6.15 6.15
1°PISO PABELLON P-02 2 3.25 6.50
1°PISO PABELLON P-02 2 3.50 7.00
1°PISO PABELLON P-02 2 6.15 12.30
1°PISO PABELLON I-01 1 4.05 4.05
1°PISO PABELLON I-01 1 3.50 3.50
1°PISO PABELLON I-01 1 9.40 9.40
1°PISO PABELLON S-3 1 3.25 3.25
1°PISO PABELLON S-3 1 3.50 3.50
1°PISO PABELLON S-3 1 9.40 9.40
1°PISO PABELLON S-2 1 3.25 3.25
1°PISO PABELLON S-2 1 3.50 3.50
1°PISO PABELLON S-2 1 6.15 6.15
TERCER PISO
1°PISO PABELLON P-01 1 4.05 4.05
1°PISO PABELLON P-01 1 3.50 3.50
1°PISO PABELLON P-01 1 9.40 9.40
EJE J-a - J-1 2 3.25 6.50
1°PISO PABELLON P-03 1 4.05 4.05
1°PISO PABELLON P-03 1 3.50 3.50
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA, PROVINCIA DE PIURA -
PIURA''
id PISO
DESCRIPCION Nº VECES DIMENSIONES PARCIAL TOTAL
TOTAL ###
TOTAL ###
###
id PISO
DESCRIPCION Nº VECES DIMENSIONES PARCIAL TOTAL
TOTAL ###
2.09.02 MAMPARAS
TOTAL ###
TOTAL ###
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
PABELLON S-3
1 SS.HH. NIÑOS V-26 4.88 0.85 4.15 1.00
1 V-16 4.05 0.85 3.44 1.00
1 SS.HH. DISCAP V-27 3.10 0.85 2.64 1.00
1 V-27 3.10 0.85 2.64 1.00
1 SS.HH. DISCAP V-27 3.10 0.85 2.64 1.00
1 V-27 3.10 0.85 2.64 1.00
1 SSHH. NIÑAS V-26 4.88 0.85 4.15 1.00
1 V-16 4.05 0.85 3.44 1.00
PABELLON S-2
1 AULA S-04 V-3 4.05 1.65 6.68 1.00
1 V-4 4.05 0.85 3.44 1.00
1 V-5 4.03 1.65 6.65 1.00
1 V-8 3.92 0.85 3.33 1.00
1 AULA S-05 V-1 4.15 1.65 6.85 1.00
1 V-4 4.05 0.85 3.44 1.00
1 V-7 4.12 1.65 6.80 1.00
1 V-8 3.92 0.85 3.33 1.00
SEGUNDO PISO
PABELLON P-01
1 AULA P-06 V-2 4.15 0.85 3.53 1.00
1 V-2 4.15 0.85 3.53 1.00
1 V-1 4.15 1.65 6.85 1.00
1 V-1 4.15 1.65 6.85 1.00
1 AULA P-07 V-3 4.05 1.65 6.68 1.00
1 V-4 4.05 0.85 3.44 1.00
1 V-5 4.03 1.65 6.65 1.00
1 V-6 3.93 0.85 3.34 1.00
1 AULA P-08 V-7 4.12 1.65 6.80 1.00
1 V-8 3.92 0.85 3.33 1.00
1 V-9 4.16 1.65 6.86 1.00
1 V-10 4.06 0.85 3.45 1.00
PABELLON P-03
1 AULA P-09 V-7 4.12 1.65 6.80 1.00
1 V-8 3.92 0.85 3.33 1.00
1 V-9 4.16 1.65 6.86 1.00
1 V-10 4.06 0.85 3.45 1.00
1 AULA P-10 V-3 4.05 1.65 6.68 1.00
1 V-2 4.05 0.85 3.44 1.00
1 V-5 4.03 1.65 6.65 1.00
1 V-8 3.92 0.85 3.33 1.00
1 AULA P-11 V-12 2.90 0.85 2.47 1.00
1 V-11 2.90 1.65 4.79 1.00
1 V-13 2.81 1.65 4.64 1.00
1 V-15 3.08 1.65 5.08 1.00
1 V-14 2.81 0.85 2.39 1.00
1 V-16 3.08 0.85 2.62 1.00
PABELLON P-02
1 AULA P-12 V-16 4.05 1.65 6.68 1.00
1 V-2 4.05 0.85 3.44 1.00
1 V-16 3.93 1.65 6.48 1.00
1 V-2 3.93 0.85 3.34 1.00
1 AULA,P-13 V-2 3.93 0.85 3.34 1.00
1 V-16 3.93 1.65 6.48 1.00
1 V-2 4.05 0.85 3.44 1.00
1 V-16 4.05 1.65 6.68 1.00
1 LABORATORIO V-2 4.05 0.85 3.44 1.00
1 V-16 4.05 1.65 6.68 1.00
1 V-2 3.93 0.85 3.34 1.00
1 V-16 3.93 1.65 6.48 1.00
1 V-2 3.93 0.85 3.34 1.00
1 V-16 3.93 1.65 6.48 1.00
1 V-2 4.05 0.85 3.44 1.00
1 V-16 4.05 1.65 6.68 1.00
PABELLON I-01
1 AULA PSICOMOTRIZ V-2 4.15 0.85 3.53 1.00
1 V-2 4.15 0.85 3.53 1.00
1 V-1 4.15 1.65 6.85 1.00
1 V-1 4.15 1.65 6.85 1.00
1 SS.HH. NIÑAS Y NIÑOS V-17 2.03 0.85 1.73 1.00
1 V-17 2.03 0.85 1.73 1.00
1 DEPOSITOS V-17 2.03 0.85 1.73 1.00
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
TOTAL M2 921.48
TOTAL M2 922.53
2.09.02 MAMPARAS
02.09.02.01 SUMINISTRO E INSTALACION DE MAMPARAS DE ALUMINIO CON CRISTAL CRUDO DE 6 mm + LAMINA SE SEGURIDAD DE 4 MICRAS
PABELLON P-03
AREA ADMINISTRATIVA ADM-01 MF 3.85 2.10 8.09
MP 5.55 2.10 11.66
M-P 5.55 2.10 11.66
M-P 3.80 2.10 7.98
MF 2.10 2.10 4.41
TOTAL M2 43.79
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
PABELLON I-01
ESCALERA MURO 1 15.90 2.95 46.91
MURO 1 6.40 2.95 18.88
VENTANA ALTA -1 2.00 1.95 -3.90
CONTRAZOCALO -1 0.10 0.00
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
PABELLON P-02
SS. HH. NIÑOS MURO SHV-01 AC-03 1 30.10 2.95 88.80
MURO 1 6.05 0.30 1.82
MURO 1 6.05 0.30 1.82
VENTANA ALTA -2 4.05 0.85 -6.89
PUERTA -1 1.00 2.10 -2.10
CONTRAZOCALO -1 0.10 0.00
SS. H.. DISC MURO SHD -01 AC-03 1 10.27 1.45 14.89
MURO -1 1.84 0.30 -0.55
VENTANA ALTA -1 1.84 0.85 -1.56
PUERTA -1 1.00 0.30 -0.30
CONTRAZOCALO -1 0.10 0.00
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
PABELLON S-03
SS.HH NIÑOS MURO SHV-02 AC-03 1 21.05 1.15 24.21
MURO 1 6.05 0.30 1.82
MURO 1 6.05 0.30 1.82
VENTANA ALTA -1 8.93 0.85 -7.59
PUERTA -1 1.00 0.30 -0.30
ZOCALO -1 1.80 0.00
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
SEGUNDO PISO
PABELLON P-01
AULA P-06 MURO AP-06 AC-01 1 34.17 2.95 100.80
MURO 1 6.05 0.30 1.82
MURO 1 6.05 0.30 1.82
VENTANA ALTA -2 4.15 0.85 -7.06
VENTANA BAJA -2 4.15 1.65 -13.70
PUERTA -1 1.10 2.10 -2.31
CONTRAZOCALO -1 0.10 0.00
PABELLON P-03
AULA P-09 MURO AP - 09 AC-01 1 34.17 2.95 100.80
MURO 1 6.05 0.30 1.82
MURO 1 6.05 0.30 1.82
VENTANA BAJA -1 8.28 1.65 -13.66
VENTANA ALTA -1 7.98 0.85 -6.78
PUERTA -1 1.10 2.10 -2.31
CONTRAZOCALO -1 0.10 0.00
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
PABELLON P-02
AULA P-12 MURO AP-12 AC-01 1 33.77 2.95 99.62
MURO 1 6.05 0.30 1.82
MURO 1 6.05 0.30 1.82
VENTANA BAJA -1 9.00 1.65 -14.85
VENTANA ALTA -1 9.00 0.85 -7.65
PUERTA -1 1.10 2.10 -2.31
CONTRAZOCALO -1 0.10 0.00
PABELLON I-01
AULA PSICOMOTRIZ MURO PSI-01 AC-01 1 34.70 2.95 102.37
MURO 1 24.80 0.75 18.60
MURO 2 6.05 0.68 8.17
VENTANA -2 4.15 0.85 -7.06
VENTANA -2 4.15 1.65 -13.70
PUERTA -1 1.10 2.10 -2.31
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
PABELLON S-3
AULA INNOVACION MURO INN-01 AC-01 1 41.24 2.95 121.66
MURO 2 6.05 0.30 3.63
VENTANA BAJA -1 7.99 1.65 -13.18
VENTANA ALTA -1 7.98 0.85 -6.78
PUERTA -2 1.10 2.10 -4.62
PUERTA -1 1.00 2.10 -2.10
PABELLON S-2
ESCALERA MURO 1 15.90 3.25 51.68
MURO 1 6.40 3.25 20.80
VENTANA ALTA -1 2.00 1.95 -3.90
TERCER PISO
PABELLON P-01
AULA P-14 MURO AP-14 AC-01 1 34.17 2.95 100.80
MURO 1 6.05 0.68 4.08
MURO 1 6.05 0.68 4.08
VENTANA ALTA -2 4.15 0.85 -7.06
VENTANA BAJA -2 4.15 1.65 -13.70
PUERTA -1 1.10 2.10 -2.31
CONTRAZOCALO -1 0.10 0.00
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
PABELLON P-03
AULA P-17 MURO AP - 17 AC-01 1 34.17 2.95 100.80
MURO 1 6.05 0.68 4.11
MURO 1 6.05 0.68 4.11
VENTANA BAJA -1 8.28 1.65 -13.66
VENTANA ALTA -1 7.98 0.85 -6.78
PUERTA -1 1.10 2.10 -2.31
CONTRAZOCALO -1 0.10 0.00
PABELLON P-02
BIBLIOTECA MURO 1 45.64 2.95 134.64
MURO 1 6.05 0.68 4.11
PUERTA -2 1.10 2.10 -4.62
VENTANA ALTA -1 13.59 0.85 -11.55
VENTANA BAJA -1 13.59 1.65 -22.42
PUERTA -1 0.90 2.10 -1.89
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
PABELLON S-03
AULA INNOVACION MURO INN-01 AC-01 1 41.24 2.95 121.66
MURO 2 6.05 0.68 8.17
VENTANA BAJA -1 7.99 1.65 -13.18
VENTANA ALTA -1 7.98 0.85 -6.78
PUERTA -2 1.10 2.10 -4.62
PUERTA -1 1.00 2.10 -2.10
PABELLON S-2
ESCALERA MURO 1 15.90 3.25 51.68
MURO 1 6.40 3.25 20.80
VENTANA ALTA -1 2.00 1.95 -3.90
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
TOTAL 5224.43
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
PABELLON P-02
12 0.45 3.25 17.55
8 1.70 3.25 44.20
PABELLON P-03
10 0.45 3.25 14.63
6 1.70 3.25 33.15
6 0.73 3.25 14.14
2 0.80 3.25 5.20
PABELLON I-1
6 0.45 3.25 8.78
8 1.70 3.25 44.20
2 1.10 3.25 7.15
PABELLON S-3
1 2.20 3.25 7.15
3 3.40 3.25 33.15
1 2.10 3.25 6.83
PABELLON S-2
10 0.45 3.25 14.63
4 1.70 3.25 22.10
PABELLON P-01
11 0.45 3.25 16.09
6 1.70 3.25 33.15
PABELLON P-02
14 0.45 3.25 20.48
10 1.70 3.25 55.25
PABELLON P-03
13 0.45 3.25 19.01
8 1.70 3.25 44.20
PABELLON I-1
10 0.45 3.25 14.63
4 1.70 3.25 22.10
PABELLON S-3
10 0.45 3.25 14.63
4 1.70 3.25 22.10
PABELLON S-2
10 0.45 3.25 14.63
4 1.70 3.25 22.10
PABELLON P-01
11 0.45 3.25 16.09
6 1.70 3.25 33.15
PABELLON P-02
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
PABELLON P-03
13 0.45 3.25 19.01
8 1.70 3.25 44.20
PABELLON I-1
10 0.45 3.25 14.63
4 1.70 3.25 22.10
PABELLON S-3
10 0.45 3.25 14.63
4 1.70 3.25 22.10
PABELLON S-2
10 0.45 3.25 14.63
4 1.70 3.25 22.10
CERCO CERCO PERIMETRICO
32 0.70 2.50 56.00
6 0.45 2.50 6.75
COLUMNAS EN LA ENTRADA DE PRIMARIA
PRIMER PISO 1 2.85 2.95 8.41
1 4.60 2.95 13.57
2 1.30 2.95 7.67
1 1.25 2.95 3.69
SEGUNDO PISO 1 2.85 2.95 8.41
1 4.60 2.95 13.57
2 1.30 2.95 7.67
1 1.25 2.95 3.69
1049.73
TOTAL 11235.10
02.11.02 PINTURA LATEX VINILICO 2 MANOS EN CIELO RASO Y VIGAS DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO
N° VECES L H PARCIAL TOTAL
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
TOTAL 4106.47
PINTURA EN VIGAS
PABELLON P-01
AULA P-01 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
AULA P-02 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
AULA P-03 1 6.05 1.05 6.35
4 4.88 0.85 16.58
2 1.95 0.65 2.54
PABELLON P-03
AULA P-04 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
TERCER PISO
PABELLON P-01
AULA P-14 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
AULA P-15 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
AULA P-16 1 6.05 1.05 6.35
4 4.88 0.85 16.58
2 1.95 0.65 2.54
PABELLON P-03
AULA P-17 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
AULA P-18 1 6.05 1.05 6.35
4 4.88 0.85 16.58
2 1.95 0.65 2.54
AULA 19 2 6.05 1.05 12.71
2 11.00 0.85 18.70
4 1.95 0.65 5.07
PABELLON P-02
BIBLIOTECA 2 6.05 1.05 12.71
6 4.88 0.85 24.86
5 1.95 0.65 6.34
DEPOSITO 1 6.05 1.05 6.35
2 4.88 0.85 8.29
AULA DCE INNOVACION 2 6.05 1.05 12.71
8 4.88 0.85 33.15
5 1.95 0.65 6.34
1 6.05 0.55 3.33
PABELLON S-3
AULA DE INNOVACION 2 6.05 1.05 12.71
1 6.05 0.55 3.33
2 22.40 0.85 38.08
6 1.95 0.65 7.61
PABELLON S-2
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
TOTAL 5436.40
TOTAL 329.54
PRIMER PISO
PABELLON P-01
ESCALERA MURO 1 15.50 15.50
PABELLON I-01
ESCALERA MURO 1 15.90 15.90
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
PABELLON P-02
ESCALERA MURO 1 15.50 15.50
PABELLON S-03
ESCALERA MURO 1 21.90 21.90
0.00
PABELLON S-02
ESCALERA MURO 1 21.90 21.90
0.00
SEGUNDO PISO
PABELLON P-01
ESCALERA MURO 1 15.50 15.50
PABELLON P-03
ESCALERA MURO 1 15.50 15.50
PABELLON P-02
ESCALERA MURO 1 15.50 15.50
PABELLON I-01
DEPOSITO MURO 1 7.12 7.12
PUERTA -1 0.80 -0.80
ALERO PASILLO 1 55.80 55.80
PABELLON S-3
ESCALERA MURO 1 15.90 15.90
PABELLON S-2
ESCALERA MURO 1 15.90 15.90
TERCER PISO
PABELLON P-01
ESCALERA MURO 1 15.50 15.50
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
PABELLON P-02
DEPOSITO MURO 1 22.40 22.40
PUERTA -1 0.90 -0.90
PABELLON S-03
ESCALERA MURO 1 15.90 15.90
PABELLON S-2
ESCALERA MURO 1 15.90 15.90
ALERO PASILLO 1 46.20 46.20
ML 1006.53
ML 250.90
ML 209.25
Ml 1,466.68
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
ML 139.62
0 0 DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO
N° VECES L H PARCIAL TOTAL
PABELLON P-01
AULA P- 01 1.00 1.10 2.10 2.31
AULA P-02 1.00 1.10 2.10 2.31
AULA P-03 1.00 1.10 2.10 2.31
PABELLON P-03 0
AULA P-04 1.00 1.10 2.10 2.31
AULA P-05 1.00 1.10 2.10 2.31
SALA DE ADMINISTRACION 1.00 1.10 2.10 2.31
PABELLON P-02 0
SS.HH. H 1.00 1.00 2.10 2.1
SS.HH.M 1.00 1.00 2.10 2.1
SS.HH. NIÑAS 1.00 1.00 2.10 2.1
SS.HH. DISCAPAC 1.00 1.00 2.10 2.1
SS.HH. DISCAPAC 1.00 1.00 2.10 2.1
SS.HH. NIÑOS 1.00 1.00 2.10 2.1
SUM 1.00 1.10 2.10 2.31
SUM 1.00 1.10 2.10 2.31
PABELLON I-1 0
AULA I-01 1.00 1.10 2.10 2.31
DEPOSITO 1.00 0.80 2.10 1.68
DEPOSITO 1.00 1.10 2.10 2.31
SS.HH. NIÑOS 1.00 0.90 2.10 1.89
SS.HH. NIÑAS 1.00 0.90 2.10 1.89
AULA I-02 1.00 1.10 2.10 2.31
SSHH. NIÑOS 1.00 0.90 2.10 1.89
SS.HH. NIÑAS 1.00 0.90 2.10 1.89
DEPOSITO 1.00 0.80 2.10 1.68
AULA I-03 1.00 1.10 2.10 2.31
PABELLON S-3 0
SS.HH. NIÑOS 1.00 1.00 2.10 2.1
SS.HH. DISCAPAC 1.00 1.00 2.10 2.1
SS.HH. DISCAPC 1.00 1.00 2.10 2.1
SS.HH NIÑAS 1.00 1.00 2.10 2.1
PABELLON S-2 0
AULA S-04 1.00 1.10 2.10 2.31
AULA S.05 1.00 1.10 2.10 2.31
SEGUNDO PISO 0
PABELLON P-01 0
AULA P- 06 1.00 1.10 2.10 2.31
AULA P-07 1.00 1.10 2.10 2.31
AULA P-08 1.00 1.10 2.10 2.31
PABELLON P-03 0
AULA P-09 1.00 1.10 2.10 2.31
AULA P-10 1.00 1.10 2.10 2.31
AULA P-11 1.00 1.10 2.10 2.31
PABELLON P-02 0
AULA P-12 1.00 1.10 2.10 2.31
AULA P-13 1.00 1.10 2.10 2.31
LABORATORIO 1.00 1.00 2.10 2.1
LABORATORIO 1.00 1.00 2.10 2.1
PABELLON I-1 0
AULA PSICOMOTRIZ 1.00 1.10 2.10 2.31
SS.HH. NIÑOS 1.00 0.90 2.10 1.89
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA,
PROVINCIA DE PIURA -PIURA''
154.14
37.12
TOTAL 27.31
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA, PROVINCIA DE PIURA -PIURA''
02.12.01 JUNTAS DE DILATACION CON ESPUMA PLÁSTICA + JEBE MICROPOROSO DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
COLUMNAS
AULA P-01 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-02 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-03 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-04 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-05 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
SALA DE ADMINISTRATIVO ENTRE COLY 12 1.30 15.60
10 2.10 21.00
SS.HH. NIÑOS Y NIÑAS ENTRE COLY 8 2.95 23.60
24 2.10 50.40
SUM COCINA ENTRE COLY 16 1.30 20.80
12 2.10 25.20
2 2.95 5.90
PABELLON I-01 ENTRE COLY 16 1.30 20.80
20 2.10 42.00
2 2.95 5.90
AULA I-03 ENTRE COLY 8 1.30 10.40
14 2.10 29.40
2 3.25 6.50
PABELLON S-3 ENTRE COLY 0 0.00
10 2.10 21.00
PABELLON S-2 ENTRE COLY 16 1.30 20.80
12 2.10 25.20
SEGUNDO
AULA P-06 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-07 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-08 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-09 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-10 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-11 ENTRE COLY 12 1.30 15.60
12 2.10 25.20
AULA P-12 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-13 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
LABOARATORIO ENTRE COLY 16 1.30 20.80
12 2.10 25.20
PABELLON I-01 ENTRE COLY 16 1.30 20.80
20 2.10 42.00
4 2.95 11.80
PABELLON S-3 ENTRE COLY 26 2.10 54.60
0.00
PABELLON S-2 ENTRE COLY 16 1.30 20.80
12 2.10 25.20
TERCER PISO
AULA P-14 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-15 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-16 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-17 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-18 ENTRE COLY 8 1.30 10.40
6 2.10 12.60
AULA P-19 ENTRE COLY 12 1.30 15.60
10 2.10 21.00
BIBLIOTECA ENTRE COLY 12 1.30 15.60
8 2.10 16.80
DEPOSITO ENTRE COLY 4 1.30 5.20
4 2.10 8.40
AREA DE CONECTIV ENTRE COLY 16 1.30 20.80
16 2.10 33.60
PABELLON S-3 ENTRE COLY 26 2.10 54.60
0.00
PABELLON S-2 ENTRE COLY 16 1.30 20.80
12 2.10 25.20
ML 1235.10
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA, PROVINCIA DE PIURA -PIURA''
02.12.01 JUNTAS DE DILATACION CON ESPUMA PLÁSTICA + JEBE MICROPOROSO DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
PRIMER PISO
PABELLON P-01 PARED 1 6.75 6.75
PISO 1 4.25 4.25
PABELLON P-03 PARED 1 6.75 6.75
PISO 1 4.25 4.25
PABELLON P-02 PARED 2 6.75 13.50
PISO 2 4.25 8.50
PABELLON I-1 PARED 1 6.75 6.75
PISO 1 4.25 4.25
PABELLON S-3 PARED 1 6.75 6.75
PISO 1 4.25 4.25
PABELLON S-2 PARED 1 6.75 6.75
PISO 1 4.25 4.25
SEGUNDO PISO
PABELLON P-01 PARED 1 6.75 6.75
PISO 1 6.40 6.40
PABELLON P-03 PARED 1 6.75 6.75
PISO 1 6.40 6.40
PABELLON P-02 PARED 2 6.75 13.50
PISO 2 6.40 12.80
PABELLON I-1 PARED 1 7.53 7.53
PISO 1 6.40 6.40
PABELLON S-3 PARED 1 6.75 6.75
PISO 1 6.40 6.40
PABELLON S-2 PARED 1 6.75 6.75
PISO 1 6.40 6.40
TERCER PISO
PABELLON P-01 PARED 1 7.53 7.53
PISO 1 6.40 6.40
PABELLON P-03 PARED 1 7.53 7.53
PISO 1 6.40 6.40
PABELLON P-02 PARED 2 7.53 15.06
PISO 2 6.40 12.80
PABELLON S-3 PARED 1 7.53 7.53
PISO 1 6.40 6.40
PABELLON S-2 PARED 1 7.53 7.53
PISO 1 6.40 6.40
ML 253.41
02.13.05 TAPAJUNTA DE ACERO INOXIDABLE + SELLO ASFALTICO BITUMINOSO EN TECHO - EXTERIOR DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
SEGUNDO PISO
PABELLON I-1 TECHO 1 9.95 9.95
TERCER PISO
PABELLON P-01 TECHO 1 9.95 9.95
PABELLON P-03 TECHO 1 9.95 9.95
PABELLON P-02 TECHO 2 9.95 19.90
PABELLON S-3 TECHO 1 9.95 9.95
PABELLON S-2 TECHO 1 9.95 9.95
ML 69.65
02.12.04 JUNTA DE DILATACION EN PISOS CON TECNOPORT DE e= 3/8" RELLENO CON POLIURETANO DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
PABELLON 01
AULAS 09 Y 10 2 29.9 59.80
DEPOSITO 1 21.2 21.20
LABORATORIO DE CIENCIAS - PRIMARIA 1 44.6 44.60
DEPOSITO 02 1 13.92 13.92
BIBLIOTECA PRIMARIA 1 45.50 45.50
PABELLON 02
AULAS 6 29.90 179.40
DEPOSITO 02 1 14.07 14.07
PABELLON 03
ADMINISTRACION 1 29.90 29.90
DEPOSITO LABORATORIO 1 13.76 13.76
TOPICO DE PSICOLOGIA 1 13.01 13.01
LABORATORIO BIOLOGIA QUIMICA - SEC. 1 37.70 37.70
DEPOSITO 01 1 14.07 14.07
BIBLIOTECA SECUNDARIA 1 37.70 37.70
AULA DE INNOVACION - PRIMARIA 1 37.70 37.70
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA
“ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA, PROVINCIA DE PIURA -PIURA''
02.12.01 JUNTAS DE DILATACION CON ESPUMA PLÁSTICA + JEBE MICROPOROSO DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
SALA DE INNOVACION - SEC 1 37.70 37.70
SUM 1 37.70 37.70
ML 749.97
02.12.05 JUNTAS ASFALTICAS e=1´´ DIMENSIONES UNIDAD M2
ITEM PISO DESCRIPCION VANO CODIGO ACABADO N° VECES L H PARCIAL TOTAL
ML 37.05
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO DE PIURA, PROVINCIA DE PIURA -
PIURA''
id PISO Nº
DESCRIPCION VECES
DIMENSIONES PARCIAL TOTAL
2.13 COBERTURA
02.13.01 COBERTURA CON PLANCHA TERMOACUSTICA DE CALAMINON (INC. ESTRUCTURA DE SOPORTE DE MADERA)
1711.28
02.13.02 COBERTURA CON PLANCHA TERMOACUSTICA DE CALAMINON (INC. ESTRUCTURA DE SOPORTE METALICA)
COBERTURA AULAS EXTERIORES 1,2,3 AL LADO DE LA ENTRADA DE INICIAL Y PRIMARIA 1 77.17 77.17
77.17
02.13.03 COBERTURA DE POLICARBONATO EN TAPASOL (INC.ESTRUCTURA DE SOPORTE METALICA)
1206.15
id PISO Nº
DESCRIPCION VECES
DIMENSIONES PARCIAL TOTAL
id PISO
DESCRIPCION DIMENSIONESPARCIAL
Nº VECES TOTAL
TOTAL ML 13.32
#REF! #REF!
#REF! #REF!
0.00
TOTAL M2 546.07
#REF! #REF!
20.00 UNID
PRIMER PISO
PABELLON P-1
AULA P-01 1 62.18 62.18
0.00
AULA P-02 1 62.13 62.13
0.00
AULA P-03 1 62.15 62.15
0.00
ALERO DE PASILLO 1 78.48 78.48
0.00
PABELLON P-3
AULA P-04 1 62.15 62.15
0.00
AULA P-05 1 62.13 62.13
0.00
AREA ADMINISTRATIVA 1 71.21 71.21
0.00
ALERO DE PASILLO 1 70.30 70.30
0.00
PABELLON P-2
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO
DE PIURA, PROVINCIA DE PIURA -PIURA''
VEREDAS
TOTAL 4729.21
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO
DE PIURA, PROVINCIA DE PIURA -PIURA''
PABELLON S-3
1 2.20 3.25 7.15
3 3.40 3.25 33.15
1 2.10 3.25 6.83
PABELLON S-2
10 0.45 3.25 14.63
4 1.70 3.25 22.10
2°PISO PABELLON P-01
11 0.45 3.25 16.09
6 1.70 3.25 33.15
TOTAL 920.30
VIGAS
PABELLON P-01
1⁰ PISO AULA P-01 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
1⁰ PISO AULA P-02 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
1⁰ PISO AULA P-03 1 6.05 1.05 6.35
4 4.88 0.85 16.58
2 1.95 0.65 2.54
PABELLON P-03
1⁰ PISO AULA P-04 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
1⁰ PISO AULA P-05 1 6.05 1.05 6.35
4 4.88 0.85 16.58
2 1.95 0.65 2.54
1⁰ PISO SALA ADMINISTRATIVA 2 6.05 1.05 12.71
2 11.00 0.85 18.70
4 1.95 0.65 5.07
PABELLON P-02
1⁰ PISO SS. HH. 1 6.05 0.65 3.93
8 4.88 0.85 33.15
5 1.95 0.65 6.34
1⁰ PISO SUM - COCINA 3 6.05 1.05 19.06
8 4.88 0.85 33.15
5 1.95 0.65 6.34
PABELLON I-01
1⁰ PISO AULA I-01 1 6.05 0.65 3.93
4 4.88 0.85 16.58
3 1.95 0.65 3.80
1⁰ PISO AULA I-02 1 6.05 1.05 6.35
1 13.80 0.85 11.73
4 1.95 0.65 5.07
1⁰ PISO AULA I-03 1 6.05 1.05 6.35
1 11.65 0.85 9.90
4 1.95 0.65 5.07
PABELLON S-3
1⁰ PISO SS - HH 1 6.05 0.65 3.93
4 4.88 0.85 16.58
6 1.95 0.65 7.61
1 22.60 0.85 19.21
PABELLON S-2
1⁰ PISO AULA S-4 1 6.05 0.65 3.93
4 4.88 0.85 16.58
4 1.95 0.65 5.07
1⁰ PISO AULA S-5 1 6.05 0.65 3.93
4 4.88 0.85 16.58
2 1.95 0.65 2.54
SEGUNDO PISO
PABELLON P-01
2° PIISO AULA P-06 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
2° PIISO AULA P-07 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
2° PIISO AULA P-08 1 6.05 1.05 6.35
4 4.88 0.85 16.58
2 1.95 0.65 2.54
PABELLON P-03
2° PIISO AULA P-09 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
2° PIISO AULA P-10 1 6.05 1.05 6.35
4 4.88 0.85 16.58
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO
DE PIURA, PROVINCIA DE PIURA -PIURA''
TERCER PISO
PABELLON P-01
3ERR PISO AULA P-14 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
3ERR PISO AULA P-15 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
3ERR PISO AULA P-16 1 6.05 1.05 6.35
4 4.88 0.85 16.58
2 1.95 0.65 2.54
PABELLON P-03
3ERR PISO AULA P-17 1 6.05 1.05 6.35
4 4.88 0.85 16.58
3 1.95 0.65 3.80
3ERR PISO AULA P-18 1 6.05 1.05 6.35
4 4.88 0.85 16.58
2 1.95 0.65 2.54
3ERR PISO AULA 19 2 6.05 1.05 12.71
2 11.00 0.85 18.70
4 1.95 0.65 5.07
PABELLON P-02
3ERR PISO BIBLIOTECA 2 6.05 1.05 12.71
6 4.88 0.85 24.86
5 1.95 0.65 6.34
3ERR PISO DEPOSITO 1 6.05 1.05 6.35
2 4.88 0.85 8.29
3ERR PISO AULA DCE INNOVACION 2 6.05 1.05 12.71
8 4.88 0.85 33.15
5 1.95 0.65 6.34
1 6.05 0.55 3.33
PABELLON S-3
3ERR PISO AULA DE INNOVACION 2 6.05 1.05 12.71
1 6.05 0.55 3.33
2 22.40 0.85 38.08
6 1.95 0.65 7.61
PABELLON S-2
3ERR PISO AULA S-12 1 6.05 0.65 3.93
PRESUPUESTO DE PINTURA - EXPEDIENTE TECNICO
OBRA: “ELABORACION DEL EXPEDIENTE TÉCNICO: '' REHABILITACION DEL LOCAL ESCOLAR VÍCTOR FRANCISCO ROSALES ORTEGA, DISTRITO
DE PIURA, PROVINCIA DE PIURA -PIURA''
TOTAL 1280.64