ACERO
Acero Ø 3/8" 1/2" , 1", 3/4" -G40 mts QQ 3,220.34 684.00 RD$3,800.00
Acero 1/2" , 1", 3/4" -G40 QQ 3,220.34 684.00 RD$3,800.00
acero ¼" x 20' - G40 QQ 1,250.00 265.50 1,475.00
Malla electrosoldada 2.7 x 2.7 10 x 10 ROLLO 13,135.59 2,790.00 RD$15,500.00
Malla Electrosoldada D2.3 15x15mm + 10% desp. ROLLO 13,135.59 2,790.00 RD$15,500.00
Malla Electrosoldada D2.3 15x15mm + 10% desp.
Malla electrosoldada 2.3 x 2.3 10 x 10 m2 108.18 22.98 127.65
Malla electrosoldada 2.5 x 2.5 10 x 10 m2 123.58 26.25 145.83
Malla electrosoldada 2.7 x 2.7 10 x 10 m2 128.54 27.30 151.68
Malla electrosoldada 2.3 x 2.3 15 x 15 m2 86.95 18.47 102.60
AGREGADOS
HORMIGON INDUSTRIAL
VARIOS
CEMENTO Y PEGAMENTOS
ACABADOS
AGREGADOS
BLOQUES DE MORMIGON
bloques de 0.10 mts (4") TAVARES INDUSTRIAL, C. x A. / AGUAYO UD 21.19 4.50 25.00
bloques de 0.15 mts (6") TAVARES INDUSTRIAL, C. x A. / AGUAYO Ud 37.29 7.92 44.00
bloques de 0.20 mts (8") TAVARES INDUSTRIAL, C. x A. / AGUAYO Ud 48.31 10.26 57.00
bloques de 0.25 mts (10") TAVARES INDUSTRIAL, C. x A. / AGUAYO Ud 76.27 16.20 90.00
PINTURA
INSUMOS ELECTRICOS
ALAMBRE DE GOMA #14/2 PL 14.75 3.13 17.40
ALAMBRE DE GOMA #14/3 PL 16.71 3.55 19.72
ALAMBRE DE GOMA #12/2 PL 18.19 3.86 21.46
ALAMBRE DE GOMA #12/3 PL 21.45 4.56 25.31
ALAMBRE DE GOMA #10/2 PL 28.44 6.04 33.56
ALAMBRE DE GOMA #10/3 PL 37.36 7.93 44.08
ALAMBRE DE GOMA #10/4 PL 58.00 12.32 68.44
ALAMBRE DE GOMA #8/2 PL 44.24 9.40 52.20
ALAMBRE DE GOMA #8/3 PL 73.73 15.66 87.00
ALAMBRE DE GOMA #8/4 PL 132.71 28.19 156.60
ALAMBRE DE GOMA #6/2 PL 51.12 10.86 60.32
ALAMBRE DE GOMA #6/3 PL 93.39 19.84 110.20
ALAMBRE DE GOMA #6/4 PL 147.46 31.32 174.00
ALAMBRE THW #14 PL 3.02 0.64 3.56
ALAMBRE THW #12 PL 11.97 2.54 14.12
ALAMBRE THW #10 PL 7.05 1.50 8.32
ALAMBRE THW #8 PL 38.50 8.18 45.43
ALAMBRE THW #6 PL 25.36 5.39 29.92
Alambre THHN # 2 (pot.) PL 77.29 16.42 91.20
Alambre THHN # 6 (neutro) PL 30.80 6.54 36.34
Alambre THHN # 8 (tierra) PL 19.56 4.15 23.08
TAPE 3M SCOTT +33 UD 353.11 75.00 416.67
TAPE 3M SCOTT +23 UD 476.78 101.27 562.60
CAJA OCTAGONAL DE 1/2" UD 102.06 21.68 120.43
CAJA OCTAGONAL DE 3/4" UD 102.06 21.68 120.43
TAPA OCTAGONAL 1/2 UD 17.69 3.76 20.88
TAPA OCTAGONAL 3/4 UD 17.69 3.76 20.88
TUERCA UF DE 1/2 UD 14.75 3.13 17.40
TUERCA UF DE 3/4 UD 14.75 3.13 17.40
CAJA RECTANGULAR DE 1/2" UD 102.06 21.68 120.43
CAJA RECTANGULAR DE 3/4" UD 102.06 21.68 120.43
TAPA PLASTICA 2 X 4 UD 4.92 1.04 5.80
TAPA DE METAL 2 X 4 UD 14.75 3.13 17.40
TAPA 2 X 4 MAMEY UD 49.15 10.44 58.00
REG. 4" X 4" X 2" AME. UD 65.86 13.99 77.72
REG. 5" X 5" X 2" AME UD 123.86 26.31 146.16
REG. 6 X 6 X 4 NIR UD 285.08 60.55 336.40
REG. 6" X 6" X 6" N3R UD 399.12 84.77 470.96
REG. 12" X 12" X 4" N1R UD 699.93 148.67 825.92
REG. 12" X 12" X 6" N1R UD 823.80 174.97 972.08
REG. 12" X 12" X 4" N3R UD 783.49 166.41 924.52
REG. 12" X 12" X 6" N3R UD 912.27 193.77 1,076.48
ROSETA PORCELANA LEVINTON UD 48.17 10.23 56.84
GLOBO DE 6" PLANO UD 471.86 100.22 556.80
TIMBRE COMPANA DE 10" UD 353.90 75.17 417.60
TIMBRE ZUMBADOR BTICINO UD 100.94 21.44 119.11
BOMBILLO BAJO CONSUMO 23W UD 172.03 36.54 203.00
LAMPARA 1T-T8/32W LISA UD 344.07 73.08 406.00
LAMPARA 2T-T8/32W LISA UD 1,081.36 229.68 1,276.00
LAMP. 2 X 2 3T-T8/32W PLAF. CON DIF.PARAB. UD 2,555.93 542.88 3,016.00
LAMP. 2 X 4 3T-T8/32W PLAF. CON DIF.PARAB. UD 3,047.46 647.28 3,596.00
LAMPARA SECADOR DE BAJO CONSUMO UD 1,254.37 266.43 1,480.16
Suministro de Lampara Tipo Cobra 150W UD 2,966.10 630.00 3,500.00
Lamp. Led 2´x 2´- Superf. UD 1,779.66 378.00 2,100.00
INT SEN. LEVINTON COMPLETO UD 24.58 5.22 29.00
TAPA PLASTICA INT.SENCILLO UD 4.92 1.04 5.80
TAPA METAL INT.SENCILLO UD 14.75 3.13 17.40
INT SEN. BTICINO UD 80.51 17.10 95.00
INT DOBLE. LEVINTON COMPLETO UD 211.31 44.88 249.35
TAPA PLASTICA INT.DOBLE UD 14.75 3.13 17.40
TAPA METAL INT.DOBLE UD 14.75 3.13 17.40
INT DOBLE BTICINO UD 103.22 21.92 121.80
INT TRIPLE BTICINO UD 167.12 35.50 197.20
INT. 3W LEVINTON UD 97.32 20.67 114.84
INT. 3W BTICINO UD 108.14 22.97 127.60
INT. 4W LEVINTON UD 325.39 69.11 383.96
INT. 4W BTICINO UD 368.64 78.30 435.00
PULSADOR TIMBRE BTICINO UD 226.10 48.02 266.80
TOMACORRIENTE 110Vac COMPL. LEVINTON UD 24.58 5.22 29.00
TAPA TOMACORRIENTE 110Vac PLASTICA UD 4.92 1.04 5.80
TAPA TOMACORRIENTE 110Vac METAL UD 14.75 3.13 17.40
TOMACORRIENTE 110Vac BTICINO UD 86.51 18.37 102.08
TOMACORRIENTE 220Vac COMPL. LEVINTON UD 54.07 11.48 63.80
TAPA TOMACORRIENTE 220Vac PLASTICO UD 5.90 1.25 6.96
TAPA TOMACORRIENTE 220Vac METAL UD 32.95 7.00 38.88
TOMACORRIENTE 220Vac. BTICINO UD 117.97 25.06 139.20
TAPE 3M SCOTT +33 UD 206.44 43.85 243.60
TAPE 3M SCOTT +23 UD 476.78 101.27 562.60
BARRA UNITRON DE 1/2" X 10' UD 516.10 109.62 609.00
BARRA UNITRON DE 5/8" X 10' UD 565.25 120.06 667.00
TARUGO AZUL C/TORNILLO UD 12.71 2.70 15.00
TORNILLO HEXAGONAL DE 1/4 X 1-1/2" UD 1.74 0.37 2.05
EXPANSION DE 1/4 X 1-1/2" UD 20.34 4.32 24.00
TORNILLO HEXAGONAL DE 3/8" X 1-1/2" UD 11.80 2.51 13.92
EXPANSION DE 3/8" X 2" UD 11.80 2.51 13.92
EXPANSION DE 3/8" X 1-1/2" UD 11.80 2.51 13.92
GANCHO DE 3/8" UD 11.80 2.51 13.92
ABANICO KDK DE TECHO B56 DE 56" UD 2,817.80 598.50 3,325.00
ABANICO KDK ORBITAL M40R DE 16" UD 4,449.15 945.00 5,250.00
ABANICO KDK DE PARED M40C UD 3,686.44 783.00 4,350.00
CONDULET DE 1/2" UD 513.97 109.17 606.48
EMT DE 1/2" X 10' UD 144.87 30.77 170.95
CURVA EMT DE 1/2" UD 37.57 7.98 44.33
COUPLING EMT DE 1/2" UD 7.93 1.68 9.36
CONECTOR RECTO EMT DE 1/2" UD 11.73 2.49 13.84
IMC DE 1/2" X 19' UD 422.71 89.78 498.80
CURVA IMC DE 1/2" UD 34.41 7.31 40.60
CONETOR HUB DE 1/2" UD 134.68 28.61 158.92
BX DE 1/2" UD 21.63 4.59 25.52
CONETOR RECTO BX 1/2" UD 11.80 2.51 13.92
CONECTOR CURVO BX DE 1/2" UD 31.46 6.68 37.12
LT DE 1/2" UD 29.49 6.26 34.80
CONETOR RECTO LT DE 1/2" UD 39.32 8.35 46.40
CONECTOR CURVO LT DE 1/2" UD 73.73 15.66 87.00
CONDUFLEX DE 1/2" UD 4.15 0.88 4.90
ABRAZADERA EMT DE 1/2" UD 2.53 0.54 2.98
ABRAZADERA UNITRON DE 1/2" UD 17.69 3.76 20.88
CONDULET DE 3/4" UD 81.59 17.33 96.28
TUB.EMT DE 3/4" X 10' UD 185.80 39.46 219.24
CURVA EMT DE 3/4" UD 43.25 9.19 51.04
COUPLING EMT DE 3/4" UD 12.78 2.71 15.08
CONECTOR RECTO EMT DE 3/4" UD 12.78 2.71 15.08
IMC DE 3/4" X 19' UD 484.64 102.94 571.88
CURVA IMC DE 3/4" UD 37.36 7.93 44.08
CONETOR HUB DE 3/4" UD 147.46 31.32 174.00
BX DE 3/4" UD 25.56 5.43 30.16
CONETOR RECTO BX 3/4" UD 14.75 3.13 17.40
CONECTOR CURVO BX DE 3/4" UD 34.41 7.31 40.60
LT DE 3/4" UD 42.27 8.98 49.88
CONETOR RECTO LT DE 3/4" UD 59.97 12.74 70.76
CONECTOR CURVO LT DE 3/4" UD 83.56 17.75 98.60
CONDUFLEX DE 3/4" UD 5.29 1.12 6.24
ABRAZADERA DE 3/4" UD 4.92 1.04 5.80
ABRAZADERA UNITRON DE 3/4" UD 14.75 3.13 17.40
CONDULET DE 1" UD 78.64 16.70 92.80
EMT DE 1" X 10' UD 297.86 63.27 351.48
CURVA EMT DE 1" UD 50.14 10.65 59.16
COUPLING EMT DE 1" UD 18.68 3.97 22.04
CONECTOR RECTO EMT DE 1" UD 18.68 3.97 22.04
IMC DE 1" X 19' UD 516.10 109.62 609.00
CURVA IMC DE 1" UD 129.76 27.56 153.12
CONETOR HUB DE 1" UD 257.56 54.71 303.92
BX DE 1" UD 40.31 8.56 47.56
CONETOR RECTO BX 1" UD 26.54 5.64 31.32
CONECTOR CURVO BX DE 1" UD 51.12 10.86 60.32
LT DE 1" UD 48.17 10.23 56.84
CONETOR RECTO LT DE 1" UD 68.81 14.62 81.20
CONECTOR CURVO LT DE 1" UD 122.88 26.10 145.00
CONDUFLEX DE 1" UD 8.85 1.88 10.44
ABRAZADERA DE 1" UD 4.92 1.04 5.80
ABRAZADERA UNITRON DE 1" UD 24.58 5.22 29.00
CONDULET DE 1-1/2" UD 78.64 16.70 92.80
EMT DE 1-1/2" X 10' UD 442.37 93.96 522.00
CURVA EMT DE 1-1/2" UD 115.02 24.43 135.72
COUPLING EMT DE 1-1/2" UD 47.19 10.02 55.68
CONECTOR RECTO EMT DE 1-1/2" UD 47.19 10.02 55.68
IMC DE 1-1/2" X 19' UD 968.31 205.67 1,142.60
CURVA IMC DE 1-1/2" UD 271.32 57.63 320.16
CONETOR HUB DE 1-1/2" UD 218.24 46.35 257.52
BX DE 1-1/2" UD 64.88 13.78 76.56
CONETOR RECTO BX 1-1/2" UD 86.51 18.37 102.08
CONECTOR CURVO BX DE 1-1/2" UD 166.14 35.29 196.04
LT DE 1-1/2" UD 110.10 23.39 129.92
CONETOR RECTO LT DE 1-1/2" UD 219.22 46.56 258.68
CONECTOR CURVO LT DE 1-1/2" UD 285.08 60.55 336.40
CONDUFLEX DE 1-1/2" UD 21.63 4.59 25.52
ABRAZADERA DE 1-1/2" UD 7.86 1.67 9.28
ABRAZADERA UNITRON DE 1-1/2" UD 23.59 5.01 27.84
CONDULET DE 2" UD 185.80 39.46 219.24
EMT DE 2" X 10' UD 605.56 128.62 714.56
CURVA EMT DE 2" UD 174.98 37.17 206.48
COUPLING EMT DE 2" UD 58.98 12.53 69.60
CONECTOR RECTO EMT DE 2" UD 58.98 12.53 69.60
IMC DE 2" X 19' UD 1,438.20 305.47 1,697.08
CURVA IMC DE 2" UD 339.15 72.04 400.20
CONETOR HUB DE 2" UD 318.51 67.65 375.84
BX DE 2" UD 61.93 13.15 73.08
CONETOR RECTO BX 2" UD 93.39 19.84 110.20
CONECTOR CURVO BX DE 2" UD 406.98 86.44 480.24
LT DE 2" UD 131.73 27.98 155.44
CONETOR RECTO LT DE 2" UD 172.03 36.54 203.00
CONECTOR CURVO LT DE 2" UD 398.14 84.56 469.80
CONDUFLEX DE 2" UD 63.90 13.57 75.40
ABRAZADERA DE 2" UD 14.55 3.09 17.17
ABRAZADERA UNITRON DE 2" UD 37.36 7.93 44.08
BARRA UNITRON DE 1/2" X 10' UD 516.10 109.62 609.00
BARRA UNITRON DE 5/8" X 10' UD 565.25 120.06 667.00
CONDULET DE 3" UD 1,368.41 290.65 1,614.72
EMT DE 3" X 10' UD 1,321.22 280.63 1,559.04
CURVA EMT DE 3" UD 1,164.92 247.43 1,374.60
COUPLING EMT DE 3" UD 248.71 52.83 293.48
CONECTOR RECTO EMT DE 3" UD 248.71 52.83 293.48
IMC DE 3" X 19' UD 3,656.95 776.74 4,315.20
CURVA IMC DE 3" UD 1,336.95 283.97 1,577.60
CONETOR HUB DE 3" UD 1,053.83 223.83 1,243.52
BX DE 3" UD 1,339.90 284.59 1,581.08
CONETOR RECTO BX 3" UD 543.63 115.47 641.48
CONECTOR CURVO BX DE 3" UD 1,803.90 383.15 2,128.60
LT DE 3" UD 382.41 81.22 451.24
CONETOR RECTO LT DE 3" UD 983.05 208.80 1,160.00
CONECTOR CURVO LT DE 3" UD 1,636.78 347.65 1,931.40
CONDUFLEX DE 3" UD 231.02 49.07 272.60
ABRAZADERA DE 3" UD 44.24 9.40 52.20
ABRAZADERA UNITRON DE 3" UD 63.90 13.57 75.40
CONDULET DE 4" UD 1,857.97 394.63 2,192.40
EMT DE 4" X 10' UD 294.92 62.64 348.00
CURVA EMT DE 4" UD 1,420.51 301.72 1,676.20
COUPLING EMT DE 4" UD 211.36 44.89 249.40
CONECTOR RECTO EMT DE 4" UD 12.78 2.71 15.08
IMC DE 4" X 19' UD 4,118.98 874.87 4,860.40
CURVA IMC DE 4" UD 2,404.54 510.72 2,837.36
CONETOR HUB DE 4" UD 1,256.34 266.85 1,482.48
BX DE 4" UD 294.92 62.64 348.00
CONETOR RECTO BX DE 4" UD 1,297.63 275.62 1,531.20
CONECTOR CURVO BX DE 4" UD 2,505.80 532.23 2,956.84
LT DE 4" UD 609.49 129.46 719.20
CONETOR RECTO LT DE 4" UD 1,370.37 291.07 1,617.04
CONECTOR CURVO LT DE 4" UD 2,486.14 528.06 2,933.64
ABRAZADERA DE 4" UD 86.51 18.37 102.08
ABRAZADERA UNITRON DE 4" UD 86.51 18.37 102.08
Breaker G.E 20/1 THQP UD 146.69 31.16 173.09
Breaker G.E 30/2 THQL UD 364.61 77.44 430.24
Breaker G.E 40/2 THQL UD 414.67 88.08 489.31
Breaker G.E 60/2 THQL UD 538.76 114.43 635.74
Breaker G.E 40/1 THQL UD 166.55 35.38 196.53
A/A Aire Acondicionado De 24BTU Und 44,067.80 9,360.00 52,000.00
A/A Aire Acondicionado De 12BTU Und 24,152.54 5,130.00 28,500.00
Extractor Und 5,762.71 1,224.00 6,800.00
Abanico KDK (Techo) 56" UD 3,898.31 828.00 4,600.00
A/A Aire Acondicionado De 12BTU Und 24,152.54 5,130.00 28,500.00
Salida Control Para Abanico Techo accesorios electricos Und 1,059.32 225.00 1,250.00
Conectores PVC de 1/2" UD 10.17 2.16 12.00
Tuercas conduit de 1/2" UD 0.95 0.20 1.12
Mensajero electrico (soga, nylon) PL 1.17 0.25 1.38
Materiales menores (tornillos, etc) P.A. 13.14 2.79 15.50
Abrazadera 3" EMT UND 54.36 11.55 64.14
Curva plastica 1/2" PL 4.49 0.95 5.30
INSUMOS SANITARIOS
TARIFA
RESOLUCION
UD POR
11/2013
HORA
Trabajador no calificado (TNC) Día RD$823.75 102.97
Trabajador calificado (TC) Día RD$901.25 112.66
Ayudante de albañilería (Ay) Día RD$1,058.75 132.34
Albañil de tercera categoría (AT) Día RD$1,313.75 164.22
Albañil de segunda categoría (AS) Día RD$1,568.75 196.09
Albañil de primera categoría (AP) Día RD$1,964.25 245.53
Maestro de albañilería (MA) Día RD$2,471.25 308.91
Composición de brigadas:
AS 1,568.75
TC 901.25
TNC 823.75
2,470.00
AP 1,964.25
AY 1,058.75
TC 901.25
TNC 823.75
4,748.00
AS 1,568.75
AT 1,313.75
AY 1,058.75
TC 901.25
4,842.50
AS 1,568.75
AY 1,058.75
2,627.50
AS 1,568.75
AY 1,058.75
TC 901.25
3,528.75
AS 1,568.75
AY 1,058.75
TC 901.25
TNC 823.75
4,352.50
AP 1,964.25
AT 1,313.75
AY 1,058.75
TC 901.25
5,238.00
AP 1,964.25
AY 1,058.75
3,023.00
AP 1,964.25
AY 1,058.75
AY 1,058.75
4,081.75
AP 1,964.25
TC 901.25
2,865.50
AP 1,964.25
AY 1,058.75
TC 901.25
3,924.25
AS 1,568.75
TC 901.25
2,470.00
AY 1,058.75
TC 901.25
1,960.00
AS 1,568.75
TNC 823.75
2,392.50
AP 1,964.25
TC 901.25
TNC 823.75
3,689.25
MA 2,471.25
AY 1,058.75
TC 901.25
4,431.25
MA 2,471.25
AY 1,058.75
AY 1,058.75
TC 901.25
5,490.00
AP 1,964.25
AY 1,058.75
AY 1,058.75
4,081.75
MA 2,471.25
AY 1,058.75
2,471.25
MUROS DE BLOQUES
Rendimiento
Por violinar juntas de blocks horizontales y verticales una cara, con una regla adicional c/u. 1AS 1TC Unid. 785.00 3.15
Llenado de huecos de bloques, bastones a 0.80 M 1AS 1TC Unid 1,175.00 2.10
Llenado de huecos de bloques, bastones a 0.60 M 1AS 1TC Unid 785.00 3.15
Llenado de huecos de bloques, bastones a 0.40 M. 1AS 1TC Unid 585.00 4.22
Llenado de huecos de bloques, Bastones a 0.20M. 1AS 1TC Unid 315.00 7.84
Corte y amarre de varillas en bloques, Bastones a 0.80 m. 1AS 1TC Unid 2,350.00 1.05
Corte y amarre de varillas en bloques, bastones a 0.60 M. 1AS 1TC Unid 1,565.00 1.58
Corte y amarre de varillas en bloques, bastones a 0.40 M. 1AS 1TC Unid 1,175.00 2.10
Corte y amarre de varillas en bloques, Bastones a 0.20 M. 1AS 1TC Unid 785.00 3.15
TERMINACION DE SUPERFICIE
Rendimiento
Pañete en muros interiores, en paredes maestriado y a plomo. 1AP 1AT 1AY 1TC M2 28.00 187.07
TERMINACION DE TECHO
Rendimiento
Rendimiento
Piso rejonado sin pulir. 1AS 1AY 1TC 1TNC M2 28.00 155.45
Piso rejonado y pulido. 1AS 1AY 1TC 1TNC M2 24.00 181.35
Piso rejonado, pulido y marcado a hilo, incluyendo color 1AS 1AY 1TC 1TNC M2 18.00 241.81
Piso de hormigón frotado con espesor de 10cms. 1AS 1AY 1TC 1TNC M2 24.00 181.35
Piso de hormigón frotado y marcado a violín, con espesor de 10 cms. 1AS 1AY 1TC 1TNC M2 18.00 241.81
Piso de hormigón pulido marcado a violín, con espesor de 0.10 mts. 1AS 1AY 1TC 1TNC M2 17.00 256.03
Piso de cemento pulido (fino solo) 1AS 1TC M2 22.00 112.27
Piso de losetas de mármol de fabricación nacional incluyendo base y nivel. 1AP 1AY M2 4.40 687.05
Piso de losetas de mármol importado incluyendo base y nivel. 1AP 1AY M2 3.80 795.53
Piso de mosaicos en cartabón. 1AP 1AY 1TC M2 11.00 356.75
Piso de mosaicos en plumilla 1AP 1AY 1TC M2 11.00 356.75
Piso de mosaicos 20x20 cms. y 25x25 cms. tipo corriente. 1AP 1AY 1TC M2 15.00 261.62
Piso de mosaicos de granito de 25x25 cms. 1AP 1AY 1TC M2 14.00 280.30
Piso de mosaicos de granito de 30x30 cms. 1AP 1AY 1TC M2 13.00 301.87
Piso de mosaicos de granito 33x33cms. 1AP 1AY 1TC M2 13.00 301.87
Piso de mosaicos de granito de 40x40cms. 1AP 1AY 1TC M2 11.00 356.75
Piso de mosaicos de granito 50x50cms. 1AP 1AY 1TC M2 10.50 373.74
Piso de mosaicos de granito en plumilla o cartabón. 1AP 1AY 1TC M2 10.50 373.74
Piso de mosaico de gravilla de 20x20cms. 1AP 1AY 1TC M2 15.00 261.62
Piso de mosaicos de gravilla de 25x25cms. 1AP 1AY 1TC M2 15.00 261.62
Piso de mosaicos de gravilla de 30x30cms. 1AP 1AY 1TC M2 14.00 280.30
Piso de mosaicos de gravilla de 40x40cms. 1AP 1AY 1TC M2 13.00 301.87
Piso de mosaicos de gravilla de 50x50cms. 1AP 1AY 1TC M2 11.00 356.75
Colocacion de vibrazo 1AP 1AY 1TC M2 11.50 341.24
Colocación de adoquines 1AP 1AY 1TC M2 14.00 280.30
Colocación tabletas de hormigón 0.20 x 0.40 m 1AP 1AY 1TC M2 11.80 332.56
Piso de losetas de cerámica de fabricación nacional de 15x15 hasta 20x20cms., sin incluir base y
nivel. 1AP 1TC M2 6.00 477.58
Piso de losetas de cerámica de fabricación nacional de 15x15 hasta 20x20cms., incluyendo base y
nivel. 1AP 1TC M2 5.00 573.10
Piso de losetas de cerámica importada de 15x15 hasta 20x20cms., sin incluir base y nivel. 1AP
1TC M2 5.70 502.72
Piso de losetas de cerámica importada de 15x15 hasta 20x20cms., incluyendo base y nivel.
1AP 1TC M2 4.75 603.26
Piso de losetas de cerámicas de fabricación nacional de 30x30 hasta 40x40 cms. Sin incluir base y
nivel 1AP 1TC M2 5.25 545.81
Piso de losetas de cerámica de fabricación nacional 30x30 hasta 40x40cms.,incluyendo base y nivel.
1AP 1TC M2 4.30 666.40
Piso de losetas de cerámica importada de 30x30 hasta 40x40cms., sin incluir base y nivel.
1AP 1TC M2 4.60 622.93
Piso de losetas de cerámica importada de 30x30 hasta 40x40cms., incluyendo base y nivel.
1AP 1TC M2 4.00 716.38
Colocación de vibrazos en pisos para parques y terrazas. 1AP 1AY 1TC M2 12.50 313.94
Colocación de torcho de 20x20 y 25x25 cms. 1AP 1AY 1TC M2 15.00 261.62
Colocación de zócalos corrientes. 1AP 1TC M.L. 30.00 95.52
Colocación zócalos de ceramica 1AP 1TC M.L. 26.50 108.13
Colocación de zócalos corrientes para escaleras. 1AP 1TC M.L. 17.00 168.56
Colocación de zócalos de granito para pisos. 1AP 1TC M.L. 20.00 143.28
Colocación de zócalos de ceramica para escaleras. 1AP 1TC M.L. 20.00 143.28
Colocación de zócalos de granito para escaleras. 1AP 1TC M.L. 13.00 220.42
Colocación de losetas de ladrillo o cemento para pisos hexagonales, ferias y otros no
M2. 6.80 421.40
especificados. 1AP 1TC
Colocación de losetas de ladrillo de 12.5x25cms. 1AP 1TC M2 8.80 325.63
Colocación de losetas de ladrillo en terrazas de 15x15 y 20x20 cms. 1AP 1TC M2 8.80 325.63
Quicio y entre puertas. 1AP 1TC M.L. 13.25 216.26
colocación piso porcelanato 1AP 1 TC REND. 4MT² ML 4.00 716.38
Rendimiento
Colocación de losetas de cemento para baños de 12.5x25 cms. 1AP 1TC M2 8.00 358.19
Colocación de azulejos 15x15cms., con junta trabada. 1AP 1TC M2 5.00 573.10
Colocación de azulejos10x10cms., en plumilla. 1AP 1TC M2 2.50 1,146.20
Colocación de azulejos 10x10cms., con junta con junta corrida 1AP 1TC M2 3.00 955.17
Colocación de azulejos en combinación 1AP 1TC M2 4.30 666.40
Colocación de azulejos 15x15cms, con junta corrida 1AP 1TC M2 5.25 545.81
Bañera revestida con azulejos altura 30cms., hasta 1.50 mts. 1AP 1TC Unid 0.75 3,820.67
Bañera revestida con azulejos altura 30cms., desde 1.50mts. hasta 1.80mts. de largo. 1AP
Unid 0.65 4,408.46
1TC
Mochetas de azulejos 1AP 1TC M.L. 8.00 358.19
Mochetas de cerámica de fabricación nacional. 1AP 1TC M.L. 7.00 409.36
Mochetas de cerámica importada 1AP 1TC M.L. 6.50 440.85
colocación listelo/cenefa 1AP 1TC M.L. 31.00 92.44
Colocacion de biceles plasticos en juntas de ceramica 1AP 1TC M.L. 70.00 40.94
Colocación en paredes de losetas de cerámica de fabricación nacional, de 15x15 hasta 20x20cms.
1AP 1TC M2 5.25 11.24
Colocación en paredes de losetas de cerámica de fabricación nacional, de 30x30 hasta 40x40 cms.
1AP 1TC M2 4.00 716.38
Colocación en paredes de losetas de cerámica importada, de 30x30 hasta 40x40cms.
M2 3.50 818.71
1AP 1TC
Hechura de base para baño. 1AP 1TC Unid 6.00 477.58
Hechura de meseta de baño revestida en azulejos o cerámica. 1AP 1TC Unid 2.30 1,245.87
Colocación de losetas para revestir muros de 8x20cms. 1AP 1TC M2 3.50 818.71
Colocación de losetas para revestir muros de 5x20cms. 1AP 1TC M2 3.00 955.17
Colocación de losetas ornamentales en paredes. 1AP 1TC M2 4.00 716.38
colocación en paredes de losetas cerámica fab. nac., de 15x15 cms hasta 20x20 cms M2 575.71
corte de losetas de cerámica UD 5.00
Limpieza y Derretido En Junta M2 45
TRABAJOS DE MARMOL
Rendimiento
ESCALONES
Rendimiento
TRABAJOS EN LADRILLOS
Rendimiento
Colocación de piedra de roca o cantos rodados en muro de mampostería. 1AS 1TC M3 2.35 1,051.06
ACERAS Y CONTENES
Rendimiento
Construcción de acera frotada y violinada 1AP 1AY 1TC 1TNC M2 20.50 231.61
Construcción de contenes 55x30x15 cms. 1AP 1AY 1TC 1TNC M.L. 19.70 241.02
ACARREOS
Arranque km 7.50
Derecho de mina m3n 25.00
Medio ambiente m3n 6.50
Regado y Nivelado de Relleno de reposición m3 120.00
Acarreo materiales (distancia desde 0.00 kms hasta 5.00 Kms) m3e/km 21.34
Acarreo materiales (distancia desde 5.00 kms hasta 10.00 Kms) m3e/km 16.57
Acarreo materiales (distancia desde 10.00 kms hasta 20.00 Kms) m3e/km 15.70
Acarreo materiales asfáltico (distancia desde 20.00 Kms en adelante) m3e/km 15.41
Acarreo material de bote de (0.00-5.00)m m3e/km 21.34
Bote de material carguio de 6 mt3 CAMION 6000
TARIFA DE VARILLA
Rendimiento
Mano obra colocacion malla electrosoldada 1MA, 1 AY, 1TC m2 92.05 48.14
Mano de obra acero zapata de muros ml 100.00
Mano de obra acero alta resistencia porticos (vigas y cols) qq 637.40
Mano de obra acero grado en losas y zapatas de cols qq 401.30
Mano de obra acero en muros de hormigon armado m2 133.76
Mano de obra acero en zapatas de muros, cols de carga ml 133.76
Mano de obra acero en dinteles y vigas de amarre ml 133.76
Mano de obra acero en nervio losas aligeradas ml 40.00
Calzos qq 5.00
Coloc. acero alta resistencia 1 MA, 2 AY, 1 TC QQ 8.95 613.41
Coloc. acero columna, losa y viga. 3/8" ó 1/2", hasta 6 de 1/2" 1 MA, 1 AY, 1 TC ML 32.58 136.01
Coloc. acero zapata de muros, cols y vigas amarre 1 MA, 1 AY, 1 TC ML 32.58 136.01
PINTURA
CARPINTERIA
Vigas de carga > 0.20m de base, para cada cm adicional hasta 0.50m, a partir de 0.50m se considera muro (1T1, 2 AY) REND. 9.50 ML 260.13 RD$24.50
Viga riostra (0.15mx0.25m) (1T1, 2 AY) REND. 22 ML 112.33
Columnas > 0.30m de cara, por cada 0.10m de ancho hasta 0.80m, a partir de 0.80m se considera muro (1T1, 2 AY) REND. 6.5 ML 380.19
ACARREOS Y SUBIDAS DE MATERIALES
ANDAMIOS
LABORES VARIAS
Mano de Obra Instalación inodoro elongado de porcelana sanitaria antibacteria UND 1,283.75
Inodoro corriente de una pieza ud 2,890.36
Inodoro corriente de dos piezas ud 1,111.30
Inodoros especiales de un cuerpo o pieza ud 1,822.07
Inodoros de pared ud 1,822.07
Instalación inodoros fluxómetros ud 1,500.00
Instalación inodoros sencillos ud 809.27
Instalación orinal fluxómetro ud 1,336.19
Instalación orinal sencillo ud 1,012.82
Orinal ud 2,190.00
Orinales de media falda ud 1,231.85
Orinales de falda ud 1,416.63
Instalación lavamanos empotrados en meseta ud 1,416.63
Instalación lavamanos con pedestal ud 1,416.63
Instalación lavamanos corriente ud 809.27
Instalación bañeras ud 1,500.00
Instalación jacuzzi ud 25,000.00
Monturas de mezcladoras de baños ud 750.00
Llaves empotradas para ducha ud 403.81
Instalación duchas hansgrohe ud 700.00
Instalación fregadero doble ud 1,416.63
Instalación fregadero sencillo ud 1,111.30
Instalación lavadero sencillo ud 850.00
Instalación lavadero doble ud 1,000.00
Lavadoras automáticas domésticas ud 1,618.53
Instalación calentador hasta 12 gls ud 1,618.53
Instalacion de plato para ducha ud 880.10
Colocación accesorios bano principal ud 1,500.00
Colocación accesorios bano servicio ud 750.00
montura de accesorios de lavamano ud 300.00
Instalación lavamanos empotrados en meseta UD 2,247.21
Tinaco antialgas de 500 gls P.A. RD$5,455.25
VENTILACION
En tuberías de ½” ó ¾” ud 809.27
En tuberías de 1” ud 1,012.82
En tuberías de 1” a 1 ½” ud 1,213.08
En tuberías de 1½” a 2” ud 1,416.63
En tubería de 2” ud 607.36
En tubería de 3” ud 809.27
En tubería de 4” ud 1,012.82
En tubería de 6” ud 1,213.08
Tuberías de 2” ml 44.32
Tuberías de 4” ml 54.17
Tuberías de 5” ml 90.29
Tuberías de 6” ml 113.26
De 3” ml 44.32
De 4” ml 54.17
De 6” ml 68.94
De 8” ml 77.15
De 10” ml 105.05
De 12” ml 162.51
LABORES VARIAS
Ventanas de doble vidrio sin camara de aire, con marco interior , escurridor de agua y perfileria P92 M2 19,368.00
Puertas correderas de Aluminio Blanco y Vidrio claro Perfil P92 Gris, Vidrios Blue-Green. m2 5,078.72
Puertas de Cristal fijo y marco de aluminio tipo comercial m2 10,500.00
Puertas metalicas m2 4,000.00
Porton Vehicular de hierro m2 5,380.00
Verja de entrada en hierro m2 5,380.00
Vidrio Fijo y marco de aluminio blanco m2 3,552.00
Vidrio Fijo y marco de aluminio blanco Perfil P92 Gris, Vidrios Blue-Green. m2 4,316.91
Puertas en Closet de riel no plegadizas m2 6,933.33
Puertas en Closet y Despensa abatibles m2 5,702.80
Puertas en Closet y Despensa correderas m2 6,400.00
Puerta plegadiza en bano de servicio 0.70 x2.20 m ud 3,500.00
Puerta de tola 0.90 x 2.10 mts ud 7,000.00
Puertas MDF hidrofuga enchapada en roble, incluye instalacion ud 9,000.00
Puertas Everdoor (0.9 x 2.10) m ud 6,500.00
Cortinas de Banos en cristal (1.92 x 2.00) m2 4,427.08
Puerta de acero perforado m2 6,000.00
Puerta metalica m2 5,000.00
Puerta chapa (1.00 x 2.10) mts m2 9,523.81
Puerta chapa con rejilla en patinillo m2 9,523.81
Ventana de aluminio y vidrio oscilo batiente m2 10,157.44
Ventanas de aluminio y vidrio abatible de una o dos hojas fijas m2 10,157.44
Ventana en Lobby de aluminio y vidrio m2 9,141.70
Vidrio fijo natural templado m2 7,618.08
Puerta doble de cristal con bandas de vinilo (2.00 x 2.17) mts m2 11,238.10
Puerta cristal translucido y acero inoxidable (0.90 x 2.17) mts m2 10,613.76
Puerta de aluminio en zonas de AC m2 10,000.00
Mampara en vidrio templado P2 804.86
Mampara en vidrio templado m2 8,660.27
Baranda para balcones en aluminio y vidrio de acero inoxidable ml 7,500.00
Puertas lisa Polimetal 1.70*0.8mt ( cabina baños ) Ud 500.00
DIVISIONES LIGERAS
MISCELANEOS
IMPERMEABILIZANTE
1.000 Preliminares
1.01 Caseta almacén de materiales (4.85mx4.95mx3.00m) (madera de pino, plywood y zinc acanalado)
Plywood 3/4 ( 2 usos) 5.0000 PLANCHA 4,000.00 3,389.83 610.17 16,949.15 3,050.85 20,000.00
Clavos de Zinc 2.0000 LBS 120.00 101.69 18.31 203.39 36.61 240.00
Clavos corriente 3.0000 LBS 60.00 50.85 9.15 152.54 27.46 180.00
Madera Pino Americano Bruta (4 usos) 120.0000 P2 125.00 105.93 19.07 12,711.86 2,288.14 15,000.00
Zinc acanalado cal.29 24.0000 PLANCHA 380.00 322.03 57.97 7,728.81 1,391.19 9,120.00
Juego bisagras 2.0000 UND 165.00 139.83 25.17 279.66 50.34 330.00
Candado 1.0000 UND 295.00 250.00 45.00 250.00 45.00 295.00
Puerta (0.90 x 2.10 mts.) y Marco 1.0000 UD 5,462.96 4,629.63 833.33 4,629.63 833.33 5,462.96
Maestro 3.0000 Día 2,471.25 7,413.75 0.00 7,413.75
Carpintero de Segunda Categoria 4.0000 Día 1,568.75 6,275.00 0.00 6,275.00
Trabajador No calificado (TNC) 6.0000 Día 823.75 4,942.50 0.00 4,942.50
Instalacion electrica 1.0000 UD 5,900.00 5,900.00 0.00 5,900.00
Herramientas (2%) 0.0200 P.A. 50,627.96 42,905.05 7,722.91 1,012.56 154.46 1,167.02
COSTO/UD 68,448.86 7,877.37 76,326.23
COSTO/M2 1,396.92 160.76 1,557.68
Madera bruta de pino americano (4 usos) 120.00 p2 RD$105.93 RD$19.07 RD$12,711.86 RD$2,288.40 RD$15,000.26
Plywood de 3/4 5.00 plan RD$3,389.83 RD$610.17 RD$16,949.15 RD$3,050.85 RD$20,000.00
Zinc acanalado cal.29 24.00 UND RD$322.03 RD$57.97 RD$7,728.81 RD$1,391.28 RD$9,120.09
Clavos corrientes 3.00 UND RD$50.85 RD$9.15 RD$152.54 RD$27.45 RD$179.99
Clavos de zinc 2.00 UND RD$101.69 RD$18.31 RD$203.39 RD$36.62 RD$240.01
Juego bisagras 2.00 UND RD$139.83 RD$25.17 RD$279.66 RD$50.34 RD$330.00
Candado 1.00 UND RD$250.00 RD$45.00 RD$250.00 RD$45.00 RD$295.00
Inst. el[ectrica 1.00 UND RD$5,000.00 RD$900.00 RD$5,000.00 RD$900.00 RD$5,900.00
Mano de Obra RD$0.00
Maestro 3.00 DIA RD$2,471.25 RD$0.00 RD$7,413.75 RD$0.00 RD$7,413.75
Trabajador 2da categoría 4.00 DIA RD$1,568.75 RD$0.00 RD$6,275.00 RD$0.00 RD$6,275.00
Peon 6.00 DIA RD$823.75 RD$0.00 RD$4,942.50 RD$0.00 RD$4,942.50
Total/UND RD$61,906.66 RD$7,789.94 RD$69,696.60
1.02 Suministro e instalación letrero identificativo de la obra, tipo banner (tamaño de 8'x4', valla impresa a todo color y tensada sobre estructura de metal con perfiles metálicos)
Arte e impresión en vilnil y colocación 1.0000 PA 26,500.00 22,457.62 4,042.37 22,457.62 4,042.37 26,500.00
Estructura metálica todo costo 1.0000 PA 30,000.00 25,423.73 4,576.27 25,423.73 4,576.27 30,000.00
COSTO/UD 47,881.35 8,618.64 56,500.00
Letrero de obra
Volumen Análisis 1.00 UND
Materiales y Equipos
Arte e impresión en vilnil y colocación 1.00 PA RD$22,457.63 RD$4,042.37 RD$22,457.63 RD$4,042.37
Estructura metálica todo costo 1.00 PA RD$25,423.73 RD$4,576.27 RD$25,423.73 RD$4,576.27
Total/UND RD$47,881.36 RD$8,618.64 RD$56,500.00
1.04 Cerramiento de área en construcción, en madera y Aluzinc, con una puerta vehicular (h=6')
Pino amer. 1"x 4"x12' bruto (4 pt) 5.1236 PT 44.30 37.54 6.76 192.35 34.62 226.98
Pino amer. 2"x 4"x12' bruto (8 pt) 10.2473 PT 54.28 46.00 8.28 471.37 84.85 556.22
Zinc acanalado, 3'x6', cal. 26 4 usos (14 / 4) 12.0267 UD 620.21 525.60 94.61 6,321.24 1,137.82 7,459.06
Clavo corriente, metalizado c/cabeza 2 1/2 0.7685 LB 31.80 26.95 4.85 20.71 3.73 24.44
Clavo de zinc 2 1/2" + 5% desp. (.133 lb. / p 6.0133 LB 49.14 41.64 7.50 250.42 45.08 295.50
Excavación para postes 10.0000 UD 36.00 0.00 360.00 0.00 360.00
Concreto postes 10.0000 UD 44.00 0.00 440.00 0.00 440.00
Relleno reposición 10.0000 UD 18.00 0.00 180.00 0.00 180.00
COSTO/UD 8,236.09 1,306.10 9,542.19
COSTO/UD 823.61 130.61 954.22
Mano de obra 1TC rend. 0.45mt3 1.0000 Mt³ 2,002.78 0.00 2,002.78 0.00 2,002.78
COSTO/UD 2,002.78 0.00 2,002.78
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
242.00 M2
Carretilla Surtek 5.5P3 (6 meses uso) 0.2000 UND 8,850.00 7,500.00 1,350.00 1,500.00 270.00 1,770.00
Pala cuadrada Tramontina 0.2000 UND 767.00 650.00 117.00 130.00 23.40 153.40
Pala de corte Tramontina 0.2000 UND 767.00 650.00 117.00 130.00 23.40 153.40
Pico 0.2000 UND 1,121.00 950.00 171.00 190.00 34.20 224.20
Bote de material (50%) 15.73 m3 RD$805.08 12,663.98 0.00 12,663.98
Ayudante de albañilería (Ay) 1.0000 DIA 1,058.75 1,058.75 0.00 1,058.75
Trabajador No calificado (TNC) 2.0000 Día 823.75 1,647.50 0.00 1,647.50
COSTO/UD 17,320.23 351.00 17,671.23
COSTO/MT² 71.57 1.45 73.02
242.0000 M2
Madera pino bruto americano 1"x4"x12 79.2000 P2 125.00 105.93 19.07 8,389.83 1,510.17 9,900.00
Madera pino bruto americano 2"x4"x12 158.4000 P2 125.00 105.93 19.07 16,779.66 3,020.34 19,800.00
Clavos dulce 2 1/2" 9.5000 LB 60.00 50.85 9.15 483.05 86.95 570.00
Cal 20 Kilos 6.0000 FDA 260.00 220.34 39.66 1,322.03 237.97 1,560.00
Hilo de gangorra 2.0000 U 169.00 143.22 25.78 286.44 51.56 338.00
Cinta métrica 0.1000 U 1,650.00 1,398.31 251.69 139.83 25.17 165.00
Brigada Topográfica 0.5000 DIA 17,700.00 15,000.00 2,700.00 7,500.00 1,350.00 8,850.00
Maestro 1.0000 DIA 2,471.25 2,471.25 0.00 2,471.25
Carpintero de Segunda Categoria 1.0000 DIA 1,058.75 1,058.75 0.00 1,058.75
Trabajador No calificado (TNC) 2.0000 Día 823.75 1,647.50 0.00 1,647.50
COSTO/UD 40,078.35 6,282.15 46,360.50
COSTO/MT² 165.61 25.96 191.57
Estructura 11.00m x 22.00m
Volumen Análisis 242.00 M2
Materiales y Equipos
Madera pino bruto americano 1"x4"x12 79.20 P2 RD$105.93 RD$19.07 RD$8,389.83 RD$1,510.34
Madera pino bruto americano 2"x4"x12 158.40 P2 RD$105.93 RD$19.07 RD$16,779.66 RD$3,020.69
Clavos dulce 2 1/2" 9.50 LB RD$50.85 RD$9.15 RD$483.05 RD$86.93
Cal 20 Kilos 6.00 FDA RD$220.34 RD$39.66 RD$1,322.03 RD$237.96
Hilo de gangorra 2.00 U RD$143.22 RD$25.78 RD$286.44 RD$51.56
Cinta métrica 0.10 U RD$1,398.31 RD$251.69 RD$139.83 RD$25.17
Brigada Topográfica 0.50 DIA RD$15,000.00 RD$2,700.00 RD$7,500.00 RD$1,350.00
Mano de Obra
Maestro 1.00 DIA RD$2,471.25 RD$0.00 RD$2,471.25 RD$0.00
Ayudante Carp. 1.00 DIA RD$1,058.75 RD$0.00 RD$1,058.75 RD$0.00
Peon 2.00 DIA RD$823.75 RD$0.00 RD$1,647.50 RD$0.00
Total/UND RD$40,078.34 RD$6,282.65 RD$46,360.99
EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos
MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32
EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos
MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32
2.03 Relleno de reposición compactado (con medio mecánicos) (con material existente excavado)
2.04 Relleno con material granular de mina para conformar explanación (incluye suministro de material, transporte, regado, mojado y compactado con equipo)
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
3.01 Zapata de columnas C1 (0.90mx1.20mx0.40.m) (Acero inferior: 1/2"@0.15m A.D.) (Acero superior: 3/8"@0.25m) (Hormigón Industrial 280kg/cm2).
Acero - Cuantía QQ/M3 1.5958 QQ 3,800.00 3,220.34 579.66 5,139.12 925.04 6,064.16
Hormigon Industrial 240 Kg/cm2 + 10% desp 1.1000 M3 7,700.00 6,525.43 1,174.58 7,177.97 1,292.03 8,470.00
Alambre Dulce No. 18 3.1917 LB 100.00 84.74 15.25 270.47 48.68 319.15
Mano de Obra Acero 1.5958 qq 613.41 978.90 0.00 978.90
COSTO/MT³ 13,566.45 2,265.76 15,832.21
3.02 Zapata de columnas C2 (1.30mx1.20mx0.40m) (Acero inferior: 1/2"@0.15m A.D.) (Acero superior: 3/8"@0.25m) (Hormigón Industrial 280kg/cm2).
Acero - Cuantía QQ/M3 1.5958 QQ 3,800.00 3,220.34 579.66 5,139.12 925.04 6,064.16
Hormigon Industrial 240 Kg/cm2 + 10% desp 1.1000 M3 7,700.00 6,525.43 1,174.58 7,177.97 1,292.03 8,470.00
Alambre Dulce No. 18 3.1917 LB 100.00 84.74 15.25 270.47 48.68 319.15
Mano de Obra Acero 1.5958 qq 613.41 978.90 0.00 978.90
COSTO/MT³ 13,566.45 2,265.76 15,832.21
3.03 Zapatas de muros 15cm (0.45mx0.25m), acero long. 3ø3/8", ø3/8"@0.25m (Hormigón Industrial 280kg/cm2).
Acero - Cuantía QQ/M3 1.0307 QQ 3,800.00 3,220.34 579.66 3,319.11 597.44 3,916.55
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Alambre Dulce No. 18 2.0613 LB 100.00 84.74 15.25 174.68 31.44 206.13
Mano de Obra Acero 8.8889 ML 136.01 1,208.99 0.00 1,208.99
COSTO/MT³ 12,160.41 1,971.26 14,131.67
Acero - Cuantía QQ/M3 3.6600 QQ 3,800.00 3,220.34 579.66 11,786.44 2,121.56 13,908.00
Vaciado y ligado Hormigón 1:2:4 - 10% desp 1.1000 M3 6,116.15 5,183.18 932.97 5,701.50 1,026.27 6,727.77
Alambre Dulce No. 18 7.3200 LB 100.00 84.74 15.25 620.31 111.66 731.97
Mano de Obra Acero 33.3300 ML 136.01 4,533.26 0.00 4,533.26
Encofrado viga de amarre Todo Costo 33.3300 ML 371.07 12,367.70 0.00 12,367.70
COSTO/MT³ 22,641.51 3,259.48 38,268.70
3.05 Losa de piso e=0.10m armado con malla electrosoldada,15x15 (hormigón industrial 210kg/cm2) (incluye separadores).
Malla Electrosoldada D2.3 15x15mm + 10% 0.1100 ROLLO 15,500.00 13,135.59 2,364.41 1,444.92 260.08 1,705.00
Hormigón industrial 210Kg/cm2 - 10% desp 1.0500 M3 7,205.15 6,106.06 1,099.09 6,411.36 1,154.04 7,565.40
Madera cepillada pino americano 4.0000 p2 125.00 105.93 19.07 423.73 76.27 500.00
Alambre Dulce No. 18 0.1100 LB 100.00 84.74 15.25 9.32 1.68 11.00
Preparación superficie - Ayudante AY 0.1000 DIA 1,058.75 105.88 0.00 105.88
Mano de Obra colocación malla 10.0000 M2 48.14 481.40 0.00 481.40
COSTO/MT³ 8,876.60 1,492.08 10,368.67
COSTO/MT² 887.66 149.21 1,036.87
Hormigón industrial 210Kg/cm2 - 10% desp 1.10 M3 RD$7,205.15 RD$84.74 RD$7,925.66 RD$93.22 7,289.89
Madera cepillada pino americano 1.00 p2 RD$105.93 RD$19.07 RD$105.93 RD$19.07 125.00
Alambre Dulce No. 18 1.10 LB RD$93.22 RD$16.78 RD$102.54 RD$18.46 110.00
Preparación superficie - Ayudante AY 0.10 DIA RD$847.00 RD$0.00 RD$84.70 RD$0.00
Mano de Obra colocación malla 10.00 M2 RD$38.51 RD$0.00 RD$385.10 RD$0.00
Total/UND RD$10,048.85 RD$390.84 RD$10,439.69
Acero - Cuantía QQ/M3 7.4761 QQ 3,800.00 3,220.34 579.66 24,075.62 4,333.61 28,409.23
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Alambre Dulce No. 18 14.9522 LB 100.00 84.74 15.25 1,267.08 228.08 1,495.16
Mano de Obra Acero 7.4761 ML 136.01 1,016.84 0.00 1,016.84
Encofrado columna hasta 0.30m Todo Costo 44.4400 ML 429.66 19,094.00 0.00 19,094.00
COSTO/MT³ 52,911.17 5,904.06 58,815.23
3.07 Columna C2(0.30mx0.40m) (8 de 3/4") ( est. 3/8" @0.15) (altura completa) (incluye cepos) (Hormigón Industrial 250kg/cm2).
Acero - Cuantía QQ/M3 5.2482 QQ 3,800.00 3,220.34 579.66 16,900.84 3,042.15 19,943.00
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Alambre Dulce No. 18 10.4963 LB 100.00 84.74 15.25 889.48 160.11 1,049.59
Mano de Obra Acero 5.2482 ML 136.01 713.81 0.00 713.81
Encofrado columna hasta 0.30m Todo Costo 32.6531 ML 429.66 14,029.65 0.00 14,029.65
COSTO/MT³ 39,991.41 4,544.63 44,536.04
3.08 Dintel 15 x 20 cms, (acero inferior 3 de 1/2") (acero superior 2 de 3/8") (estribos 3/8"@0.20m) (Hormigón 210kg/cm2).
Acero - Cuantía QQ/M3 4.3303 QQ 3,800.00 3,220.34 579.66 13,945.19 2,510.13 16,455.32
Alambre No.18 8.6607 LBS 100.00 84.74 15.25 733.93 132.11 866.03
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 MT³ 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
M.O acero 26.6667 QQ 136.01 3,626.97 0.00 3,626.97
Encofrado dintel todo costo 26.6667 ML 526.68 14,044.73 0.00 14,044.73
COSTO/MT³ 39,808.44 3,984.61 43,793.06
3.09 Viga V1 (0.30x0.40m) (acero inferior: 2 de 3/4") (acero superior: 4 de 1/2") (acero central : 2 de 3/8") (est. 3/8"@0.20m) (Hormigón Industrial 280kg/cm2).
Acero - Cuantía QQ/M3 3.6840 QQ 3,800.00 3,220.34 579.66 11,863.76 2,135.48 13,999.24
Alambre No.18 7.3680 LBS 100.00 84.74 15.25 624.38 112.39 736.77
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 MT³ 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
M.O acero 3.6840 QQ 613.41 2,259.80 0.00 2,259.80
Encofrado dintel todo costo 7.7778 ML 766.75 5,963.61 0.00 5,963.61
COSTO/MT³ 28,169.18 3,590.24 31,759.42
3.1 Viga V2 (0.30mx0.45m) (acero inferior: 2 de 3/4") (acero superior: 4 de 1/2") (est. 3/8"@0.20m) (Hormigón Industrial 2580kg/cm2).
Acero - Cuantía QQ/M3 3.46 QQ 3,800.00 3,220.34 579.66 11,149.47 2,006.90 13,156.37
Alambre No.18 6.9244 LBS 100.00 84.74 15.25 586.79 105.62 692.41
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 MT³ 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
M.O acero 3.4622 QQ 613.41 2,123.74 0.00 2,123.74
Encofrado dintel todo costo 7.7778 ML 766.75 5,963.61 0.00 5,963.61
COSTO/MT³ 27,281.24 3,454.90 30,736.14
3.11 Losa (e=0.15 m) en hormigón armado (acero grado 60, Ø3/8@ @ 0.20m) (Hormigón Industrial 280kg/cm2).
Acero - Cuantía QQ/M3 1.2800 QQ 3,800.00 3,220.34 579.66 4,122.03 741.97 4,864.00
Alambre No.18 2.5600 LBS 100.00 84.74 15.25 216.94 39.05 255.99
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 MT³ 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
M.O acero 1.2800 QQ 613.41 785.16 0.00 785.16
Encofrado dintel todo costo 6.6667 ML 766.75 5,111.67 0.00 5,111.67
COSTO/MT³ 17,693.43 2,123.39 19,816.82
4.01 Construcción de muros de bloques de hormigón de 6" (industrial), bastones ø3/8"@0.40m (con todos los huecos llenos)
bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 3/8" x 20' -G40 0.0420 QQ 3,800.00 3,220.34 579.66 135.25 24.35 159.60
alambre dulce #18 0.0840 Lbs 100.00 84.74 15.25 7.12 1.28 8.40
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 Kg/cms2 (1:3:5) 0.0590 m3 6,116.15 5,183.18 932.97 305.81 55.05 360.85
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.40 mts 13.0000 Ud 2.10 1.78 0.32 23.16 4.17 27.33
Andamios 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Herramientas (2%) 0.0200 P.A. 734.50 622.46 112.04 12.45 2.24 14.69
COSTO/MT² 1,596.98 214.06 1,811.04
Suministro bloques horm. +4% desp. 13.00 UND RD$38.14 RD$6.86 RD$495.76 RD$89.18
Hormigón 1:3:5 en cámaras +10% desp. 0.0688 M3 RD$5,721.68 RD$0.00 RD$393.37 RD$0.00
Mortero 1:3 en juntas + 30% desp. 0.0250 M3 RD$6,132.22 RD$0.00 RD$153.31 RD$0.00
Acero bastones 3/8" + 20% desp. 0.0518 QQ RD$3,220.34 RD$579.66 RD$166.81 RD$30.03
Alambre Dulce No. 18 para amarrar bastone 0.0780 LB RD$93.22 RD$16.78 RD$7.27 RD$1.31
Andamios 1.00 M2 RD$50.24 RD$84.74 RD$50.24 RD$84.74
Mano de Obra
Colocación bloques 13.00 UND RD$17.02 RD$0.00 RD$221.26 RD$0.00
Llenado de huecos @ 0.20 m 13.00 UND RD$7.88 RD$0.00 RD$102.44 RD$0.00
Corte y amarre varillas @ 0.40 m 13.00 UND RD$2.12 RD$0.00 RD$27.56 RD$0.00
Total/UND RD$1,618.02 RD$205.26 RD$1,823.28
4.02 Construcción de muros de bloques de hormigón de 6" (industrial), bastones ø3/8"@0.60m; Acero horizontal 2ø3/8"@0.60m . S.N.P.
bloques de 0.15 mts (6") TAVARES INDUSTRI 13.0000 Ud 44.00 37.29 6.71 484.75 87.25 572.00
acero 3/8" x 20' -G40 0.1184 QQ 3,800.00 3,220.34 579.66 381.27 68.63 449.90
alambre dulce #18 0.1590 Lbs 100.00 84.74 15.25 13.47 2.43 15.90
mezcla 1:3 0.0250 m3 6,993.84 5,926.98 1,066.86 148.17 26.67 174.85
Hormigón 140 Kg/cms2 (1:3:5) 0.0367 m3 6,116.15 5,183.18 932.97 190.05 34.21 224.26
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.40 mts 13.0000 Ud 2.10 27.33 0.00 27.33
Andamios 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Herramientas (2%) 0.0200 P.A. 1,037.80 879.49 158.31 17.59 3.17 20.76
COSTO/MT² 1,723.86 231.98 1,955.84
Suministro bloques horm. +4% desp. 13.00 UND RD$38.14 RD$6.86 RD$495.76 RD$89.18 584.94
Acero bastones 3/8" + 20% desp. 0.1184 QQ RD$3,220.34 RD$579.66 RD$381.27 RD$68.63 449.90
Alambre Dulce No. 18 para amarrar bastone 0.1590 LB RD$93.22 RD$16.78 RD$14.82 RD$2.67 17.49
Mortero 1:3 en juntas + 30% desp. 0.0250 M3 RD$6,132.22 RD$37.29 RD$153.31 RD$0.93 154.24
Hormigón 1:3:5 en cámaras +10% desp. 0.0367 M3 RD$5,721.68 RD$0.00 RD$209.79 RD$0.00 209.79
Colocación bloques 13.00 UND RD$17.02 RD$0.00 RD$221.26 RD$0.00 221.26
Llenado de huecos @ 0.60 m 13.00 UND RD$3.13 RD$0.00 RD$40.69 RD$0.00 40.69
Corte y amarre varillas @ 0.60 m 13.00 UND RD$4.71 RD$0.00 RD$61.23 RD$0.00 61.23
Andamios 1.00 M2 RD$50.24 RD$50.24 RD$0.00 50.24
Total/UND RD$1,628.37 RD$161.41 RD$1,789.78
4.03 Antepecho con bloques de hormigón de 6" (incluyendo pañete y cantos terminado), H=0.40m
Muro de bloques de 15 cms Ø3/8" @ 0.60 0.4000 m2 1,892.75 1,604.03 288.72 641.61 115.49 757.10
Pañete maestreado y a plomo 0.9500 m2 422.50 358.05 64.45 340.15 61.23 401.38
Cantos 3.0000 ml 205.79 174.40 31.39 523.20 94.18 617.37
Mano de Obra Subida materiales - Ayudant 0.0500 dia 1,058.75 52.94 0.00 52.94
COSTO/MT² 1,557.90 270.89 1,828.79
Muro de bloques de 15 cms Ø3/8" @ 0.60 0.40 m2 RD$1,323.49 RD$171.78 RD$529.40 RD$68.71
m
Pañete maestreado y a plomo 0.95 m2 RD$399.62 RD$29.02 RD$379.64 RD$27.57
Cantos 3.00 ml RD$203.06 RD$21.28 RD$609.18 RD$63.84
Mano de obra
Mano de Obra Subida materiales - 0.05 dia RD$1,058.75 RD$0.00 RD$52.94 RD$0.00
Ayudante AY
Total/UND 1,571.16 160.12 1,731.28
5.01 Fraguache
Mortero 1:4 de empañete 1.50mm + 50% de 0.0020 M3 RD$6,467.18 RD$1,089.88 RD$12.93 RD$2.18
Regla madera americana cepillada 1"x4" / 2 0.1667 PT RD$105.93 RD$19.07 RD$17.66 RD$3.18
Mano de Obra
Mano de obra fraguache 1.00 M2 RD$45.19 RD$0.00 RD$45.19 RD$0.00
Total/UND RD$75.78 RD$5.36 RD$81.14
Mortero 1:4 de empañete 1.75cm + 25% des 0.0250 M3 6,312.04 5,349.18 962.85 133.73 24.07 157.80
Regla madera americana cepillada 1"x4" / 2 0.1667 PT 125.00 105.93 19.07 17.66 3.18 20.84
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra empañete exterior 1.0000 M2 238.09 238.09 0.00 238.09
COSTO/MT² 442.95 36.87 479.82
Mortero 1:4 de empañete 1.75cm + 25% des 0.0250 M3 RD$6,467.18 RD$1,089.88 RD$161.68 RD$27.25
Regla madera americana cepillada 1"x4" / 2 0.1667 PT RD$105.93 RD$19.07 RD$17.66 RD$3.18
Andamios en madera 1.00 M2 RD$50.24 RD$1.97 RD$50.24 RD$1.97
Mano de Obra
Mano de obra empañete exterior 1.00 M2 RD$241.94 RD$0.00 RD$241.94 RD$0.00
Total/UND RD$471.52 RD$32.40 RD$503.92
5.03 Pañete maestreado en muros interiores (con mortero 1:4)
Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 6,312.04 5,349.18 962.85 117.15 21.09 138.23
Regla madera americana cepillada 1"x4" / 2 0.1667 PT 125.00 105.93 19.07 17.66 3.18 20.84
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra empañete exterior 1.0000 M2 187.07 187.07 0.00 187.07
COSTO/MT² 375.34 33.89 409.23
Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 RD$6,467.18 RD$1,089.88 RD$141.63 RD$23.87
Regla madera americana cepillada 1"x4" / 2 0.1667 PT RD$105.93 RD$19.07 RD$17.66 RD$3.18
Andamios en madera 1.00 M2 RD$50.24 RD$9.04 RD$50.24 RD$9.04
Mano de Obra
Mano de obra empañete interior 1.00 M2 RD$190.09 RD$0.00 RD$190.09 RD$0.00
Total/UND RD$399.62 RD$36.09 RD$435.71
Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 6,312.04 5,349.18 962.85 117.15 21.09 138.23
Regla madera americana cepillada 1"x4" / 2 0.1667 PT 125.00 105.93 19.07 17.66 3.18 20.84
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra empañete exterior 1.0000 M2 270.64 270.64 0.00 270.64
COSTO/MT² 458.91 33.89 492.80
Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 6,312.04 5,349.18 962.85 117.15 21.09 138.23
Regla madera americana cepillada 1"x4" / 2 0.1667 PT 125.00 105.93 19.07 17.66 3.18 20.84
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra empañete exterior 1.0000 M2 349.20 349.20 0.00 349.20
COSTO/MT² 537.47 33.89 571.36
Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 RD$6,467.18 RD$1,089.88 RD$141.63 RD$23.87
Regla madera americana cepillada 1"x4" / 2 0.1667 PT RD$105.93 RD$19.07 RD$17.66 RD$3.18
Andamios en madera 1.00 M2 RD$50.24 RD$1.97 RD$50.24 RD$1.97
Mano de Obra
Mano de obra empañete columnas 1.00 M2 RD$354.91 RD$0.00 RD$354.91 RD$0.00
Total/UND RD$564.44 RD$29.02 RD$593.46
5.06 Cantos
madera pino americano cepillada 0.8300 P2 125.00 105.93 19.07 87.92 15.83 103.75
mezcla 1:1.5:5 (pañete) 0.0050 m3 3,457.52 2,930.10 527.42 14.65 2.64 17.29
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 121.04 102.57 18.46 2.05 0.37 2.42
COSTO/ML 186.96 18.83 205.79
Mortero 1:4 para empañete + 10% desp. 0.0050 M3 RD$6,467.18 RD$1,089.88 RD$32.34 RD$5.45
Regla madera americana cepillada 1"x4" / 4 0.83 PT RD$105.93 RD$19.07 RD$87.92 RD$15.83
Mano de Obra
Mano de obra canto 1.00 ML RD$82.80 RD$0.00 RD$82.80 RD$0.00
Total/UND RD$203.06 RD$21.28 RD$224.34
Mortero 1:4 para empañete + 30% desp. 0.0200 M3 6,312.04 5,349.18 962.85 106.98 19.26 126.24
Regla madera americana cepillada 1"x4" / 1 0.3300 PT 125.00 105.93 19.07 34.96 6.29 41.25
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra goteros colgantes 1.0000 M2 190.00 190.00 0.00 190.00
COSTO/ML 385.41 35.17 420.58
Mortero 1:4 para empañete + 30% desp. 0.0200 M3 RD$6,467.18 RD$1,089.88 RD$129.34 RD$21.80
Regla madera americana cepillada 1"x4" / 1 0.33 PT RD$105.93 RD$19.07 RD$34.96 RD$6.29
Andamios en madera 1.00 M2 RD$50.24 RD$1.97 RD$50.24 RD$1.97
Mano de Obra
Mano de obra goteros colgantes 1.00 M2 RD$191.07 RD$0.00 RD$191.07 RD$0.00
Total/UND RD$405.61 RD$30.06 RD$435.67
6.01 Suministro e instalación de baldosas de granito para pisos, fondo blanco (0.40mx0.40m), derretido blanco, (pulido, brillado y cristalizado); juntas de 2mm.
Granito 40x40 fondo blanco + 10% desp. 1.0500 M2 1,200.00 1,016.95 183.05 1,067.80 192.20 1,260.00
Derretido Cemento Blanco (100 LBS) 0.0700 Fds 1,500.00 1,271.19 228.81 88.98 16.02 105.00
Mortero 1:10 pisos + 10% desp. 0.0320 m3 4,927.88 4,176.17 751.71 133.64 24.05 157.69
Estopa 0.0500 LB 125.00 105.93 19.07 5.30 0.95 6.25
Pulido y cristalizado de pisos 1.0000 M2 350.00 350.00 0.00 350.00
Colocacion Piso De Mosaicos De Granito 1.0000 m2 373.74 373.74 0.00 373.74
Corte De Chazos 3.0000 Ud 25.00 75.00 0.00 75.00
MO derretido pisos 1.0000 m2 15.45 15.45 0.00 15.45
Herramientas (2%) 0.0200 P.A. 1,522.69 1,290.42 232.28 25.81 4.65 30.45
COSTO/M2 2,135.71 237.87 2,373.59
Mortero 1:10 pisos + 10% desp. 0.03 M3 RD$4,375.86 RD$713.46 RD$151.62 RD$24.72
Granito 30x30 fondo blanco + 10% desp. 1.10 M2 RD$1,016.95 RD$183.05 RD$1,118.64 RD$201.36
Derretido Keracolor 25 lbs + 10% desp. 0.045 FDA RD$1,271.19 RD$228.81 RD$57.20 RD$10.30
Estopa 0.05 LB RD$105.93 RD$19.07 RD$5.30 RD$0.95
Pulido y cristalizado de pisos 1.00 M2 RD$296.61 RD$53.39 RD$296.61 RD$53.39
Corte de Chazos Granito 1.00 m2 RD$21.19 RD$3.81 RD$21.19 RD$3.81
Transporte de pisos (3%) 1.00 PA RD$39.60 RD$0.00 RD$39.60 RD$0.00
Mano de obra
Mano de Obra de colocación de Granito 1.00 M2 RD$375.53 RD$0.00 RD$375.53 RD$0.00
Total/UND RD$2,065.69 RD$294.53 RD$2,360.22
6.02 Suministro y colocación de zócalos de granito fondo blanco (0.40mx0.07m) con derretido blanco, cristalizado; juntas de 2mm.
Granito 40x40 fondo blanco + 10% desp. 0.2000 M2 1,200.00 1,016.95 183.05 203.39 36.61 240.00
Mortero 1:10 pisos + 10% desp. 0.0020 m3 4,927.88 4,176.17 751.71 8.35 1.50 9.86
derretido cemento blanco (100 LBS) 0.0300 FDS 1,500.00 1,271.19 228.81 38.14 6.86 45.00
Estopa 0.0030 LB 125.00 105.93 19.07 0.32 0.06 0.38
Corte De Chazos 3.0000 Ud 25.00 75.00 0.00 75.00
colocación zócalos 1.0000 ML 143.28 143.28 0.00 143.28
Herramientas (2%) 0.0200 P.A. 370.23 313.75 56.48 6.28 1.13 7.40
COSTO/ML 474.75 46.16 520.91
Mortero 1:10 pisos + 10% desp. 0.0020 M3 RD$4,375.86 RD$713.46 RD$8.75 RD$1.43
Granito 30x30 fondo blanco + 10% desp. 0.20 M2 RD$1,016.95 RD$183.05 RD$203.39 RD$36.61
Derretido Keracolor 25 lbs + 10% desp. 0.003 FDA RD$1,271.19 RD$228.81 RD$3.81 RD$0.69
Estopa 0.003 LB RD$105.93 RD$19.07 RD$0.32 RD$0.06
Corte de Chazos Granito 1.00 M2 RD$21.19 RD$3.81 RD$21.19 RD$3.81
Transporte de pisos (3%) 1.00 PA RD$7.20 RD$0.00 RD$7.20 RD$0.00
Mano de obra
Mano de Obra de colocación zócalos 1.00 ML RD$130.82 RD$0.00 RD$130.82 RD$0.00
Total/UND RD$375.48 RD$42.60 RD$418.08
6.03 Suministro y colocación de piso de porcelanato de alto tránsito, antideslizante, todo masa, espesor 8mm, formato 0.60mx0.60m o 0.40mx0.40m, rectificada, procedencia europea
Piso de porcelanato de alto tránsito, antide 1.2000 M2 2,000.00 1,694.92 305.08 2,033.90 366.10 2,400.00
Mortero 1:10 pisos + 10% desp. 0.0300 m3 4,927.88 4,176.17 751.71 125.28 22.55 147.84
derretido cemento blanco (100 LBS) 0.0450 FDS 1,500.00 1,271.19 228.81 57.20 10.30 67.50
Estopa 0.0500 LB 125.00 105.93 19.07 5.30 0.95 6.25
Corte De Chazos de porcelanato 2.5000 Ud 25.00 62.50 0.00 62.50
colocación piso porcelanato 1.0000 M2 716.38 716.38 0.00 716.38
Herramientas (2%) 0.0200 P.A. 2,684.09 2,274.65 409.44 45.49 8.19 53.68
COSTO/ML 3,046.05 408.09 3,454.14
Mortero 1:10 pisos + 10% desp. 0.03 M3 RD$4,375.86 RD$713.46 RD$151.62 RD$24.72
Porcelanato Romano +20% desp. 1.20 M2 RD$1,694.92 RD$305.08 RD$2,033.90 RD$366.10
Derretido Keracolor 25 lbs + 10% desp. 0.045 FDA RD$1,271.19 RD$228.81 RD$57.20 RD$10.30
Estopa 0.05 LB RD$105.93 RD$19.07 RD$5.30 RD$0.95
Corte de Chazos Porcelanato 2.50 UND RD$21.19 RD$3.81 RD$52.97 RD$9.53
Transporte de pisos (3%) 1.00 M2 RD$72.00 RD$0.00 RD$72.00 RD$0.00
Mano de obra
Mano de Obra de colocación de
Porcelanato 1.00 M2 RD$625.79 RD$0.00 RD$625.79 RD$0.00
Total/UND RD$2,998.78 RD$411.60 RD$3,410.38
7.00 Plafones
8.01 Suministro y colocación revestimiento de porcelanato (0.30mx0.60m), rectificada (colocación junta trabada), color a especificar, procedencia europea
Cerámica + 10% desperdicio 1.1500 M2 1,600.00 1,355.93 244.07 1,559.32 280.68 1,840.00
Pegamento de cerámica Pegatod 0.2500 FDA 522.00 442.37 79.63 110.59 19.91 130.50
Cemento gris 0.0500 FDA 480.00 406.78 73.22 20.34 3.66 24.00
Derretido Keracolor 25 lbs + 10% desp. 0.0050 FDA 1,500.00 1,271.19 228.81 6.36 1.14 7.50
Estopa 0.0500 LB 125.00 105.93 19.07 5.30 0.95 6.25
Corte de Chazos 1.0000 m2 25.00 21.19 3.81 21.19 3.81 25.00
Separadores de cerámica 0.0500 FDA 285.00 241.53 43.47 12.08 2.17 14.25
Mano de Obra de colocación de Cerámica 1.0000 M2 716.38 607.10 109.28 607.10 109.28 716.38
COSTO/ML 2,342.27 421.61 2,763.88
8.02 Suministro e instalación de cantos plástico (color semejante a cerámica) en esquinas cerámicas.
9.00 Pintura
9.01 Imprimador (primer) acrílico de alto desempeño, 100% látex acrílico, resistente a la alcalinidad y a la eflorescencia. Incluye preparación de superficie
Imprimador (primer) acrílico de alto desem 0.0800 GLS 650.00 550.85 99.15 44.07 7.93 52.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 137.00 116.10 20.90 2.32 0.42 2.74
COSTO/MT² 187.23 19.79 207.02
pintura acrílica 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Andmios - Guidolas 0.5000 M2 63.09 53.47 9.62 26.73 4.81 31.55
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 272.74 35.18 307.93
9.03 Suministro y aplicación de pintura acrílica en exteriores, calidad superior (dos capas) (incluye preparación de superficie)
pintura acrílica 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38
9.04 Suministro y aplicación de pintura hospitalaria antibacterial y antimicrobiana, acabado semigloss, calidad superior (dos capas) (incluye preparación de superficie) (autoprimer y pintura) (99.9% de efectividad)
pintura hospitalaria antibacterial y antimic 0.0800 GLS 1,900.00 1,610.17 289.83 128.81 23.19 152.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 237.00 200.85 36.15 4.02 0.72 4.74
COSTO/MT² 273.67 35.35 309.02
10.01 Suministro e instalación de puerta doble (2.00x2.10)m de acero inoxidable grado 316, calibre 19, satinada, cerradura de acero inoxidable, con visor en vidrio laminado de seguridad de 6mm 0.20mx0.55m,
reforzada en área de choque de camillas, con placa de empuje, instalada con cierre oculto en marco superior europea/americana y pivot en piso, con cierre hermético y felpa, garantía de 5 años. Entrada camillas.
B Puertas de Polimetal
10.02 Suministro e instalación puerta de polimetal (P-4) de 1.00m x 2.10m de altura, lisa color blanco, llavín tipo palanca de acero inoxidable, con rejilla para ventilación 0.30mx0.30m (ambos lados de puerta), con
brazo hidráulico en cada hoja y tope fijo en puerta garantía de 5 años
C Ventanas
10.03 Suministro e instalación de ventana corredera en aluminio P-92, con marcos de aluminio de 1 1/2, vidrio con laminado de seguridad de 6mm y operadores de palanca en los extremos, marcos color blanco
10.04 Suministro e instalación de vidrio fijo en aluminio P-92, con marcos de aluminio de 1 1/2, vidrio con laminado de seguridad de 6mm, marcos color blanco
10.05 Suministro y colocación de laminado de protección solar (transmisión de luz visible 5%) (medidas por áreas de vidrio)
11.01 Suministro e instalación lavamanos de porcelana sanitaria antibacterial completo, con pedestal, tamaño de mínimo de 54cmx47cm, con mezcladora push temporizado (de latón cromado, resistente a corrosión)
(cierre 15±5s, caudal: 6 l/min regulable) incluye salidas de agua potable y drenaje,
niple niquelado 3/8" x 2½" 2.0000 UD 45.00 38.14 6.86 76.27 13.73 90.00
reducción bushing de ½" A 3/8" HG. 2.0000 UD 29.66 25.14 4.52 50.27 9.05 59.32
sifón drenaje 1½" 1.0000 UD 192.29 162.96 29.33 162.96 29.33 192.29
boquilla para lavamanos 1.0000 UD 700.00 593.22 106.78 593.22 106.78 700.00
cubrefalta niquelado de 3/8" 2.0000 UD 18.00 15.25 2.75 30.51 5.49 36.00
llave ANGULAR de 3/8" 2.0000 UD 244.86 207.51 37.35 415.02 74.70 489.72
tubo flexible plástico 2.0000 UD 127.57 108.11 19.46 216.22 38.92 255.14
mezcladora 1.0000 UD 1,963.25 1,663.77 299.48 1,663.77 299.48 1,963.25
tarugos plásticoS 3/8" 4.0000 UD 15.00 12.71 2.29 50.85 9.15 60.00
tornillo 3" x 14 4.0000 UD 42.83 36.30 6.53 145.19 26.13 171.32
Manguera flexible lavamanos inox. 3/8" Ea 2.0000 UND 230.00 194.92 35.08 389.83 70.17 460.00
lavamanos de porcelana sanitaria antibacter 1.0000 UD 3,725.00 3,156.78 568.22 3,156.78 568.22 3,725.00
Instalación lavamanos empotrados en mese 1.0000 UD 2,247.21 2,247.21 0.00 2,247.21
COSTO/UD 9,198.09 1,251.16 10,449.25
Suministro e instalación de inodoro elongado de porcelana sanitaria antibacterial completo, one piece de tanque, pulsador palanca, tamaño mínimo (76x44x75)cm de bajo consumo y que cumplan con los
11.02 requerimientos para accesibilidad, color blanco, c/asiento y tapa, incluye salida de agua y de drenaje
Inodoro Bath Collection Bco. con tapa 1.0000 UND 9,895.00 8,385.59 1,509.41 8,385.59 1,509.41 9,895.00
niple niquelado 3/8" x 2½" 1.0000 UD 45.00 38.14 6.86 38.14 6.86 45.00
reducción bushing de ½" A 3/8" HG. 1.0000 UD 29.66 25.14 4.52 25.14 4.52 29.66
arandela sanitaria PVC de 3 ó 4" 1.0000 UD 99.04 83.93 15.11 83.93 15.11 99.04
cubrefalta niquelado de 3/8" 1.0000 UD 18.00 15.25 2.75 15.25 2.75 18.00
junta de CERA 1.0000 UD 99.59 84.40 15.19 84.40 15.19 99.59
llave ANGULAR de 3/8" 1.0000 UD 244.86 207.51 37.35 207.51 37.35 244.86
tubo flexible plástico 1.0000 UD 127.57 108.11 19.46 108.11 19.46 127.57
tornillos para inodoros 2.0000 UD 42.83 36.30 6.53 72.59 13.07 85.66
Tubo de Silicon industrial trasnp. 10.3 0.3000 UD 450.00 381.36 68.64 114.41 20.59 135.00
Teflon 3/4'' 0.5000 UD 22.94 19.44 3.50 9.72 1.75 11.47
Salida Agua Potable 1/2" Poliestileno 18mm 1.0000 UND 1,716.51 1,454.67 261.84 1,454.67 261.84 1,716.51
Salida Sanitaria A.N. 4" Inodoro Aérea 1.0000 UND 2,187.15 1,853.52 333.63 1,853.52 333.63 2,187.15
montura inodoros de una pieza 1.0000 UD 1,283.75 1,087.92 195.83 1,087.92 195.83 1,283.75
COSTO/UD 5,155.31 927.95 15,978.26
11.03 Suministro e instalación de desagüe de piso Ø2", PVC SDR 41, rejilla acero inoxidable (cuadrada 4"x4"), sifonada (completa)
sifón drenaje 2" 1.0000 UD 192.29 162.96 29.33 162.96 29.33 192.29
rejilla roscada de 2" HG para piso 1.0000 UD 70.00 59.32 10.68 59.32 10.68 70.00
desague de piso de 2 pulgadas (Incl. Parrilla 1.0000 Ud 1,122.30 1,122.30 0.00 1,122.30
COSTO/UD 1,344.58 40.01 1,384.59
11.04 Salida agua potable y desagüe p/meseta en acero inoxidable con fregadero
Tubo 2", pvc SDR-41 + 10% desp. 44.0000 P 53.68 45.50 8.19 2,001.78 360.32 2,362.11
Entrada de agua potable de Ø 1/2" (40' +10 44.0000 P 9.15 7.75 1.40 341.19 61.41 402.60
Tubería de cobre de Ø 1/2" para aire (40' + 44.0000 P 37.20 31.53 5.67 1,387.12 249.68 1,636.80
Mano de obra del desagüe 2" 1.0000 UD 598.61 598.61 0.00 598.61
Mano de obra salida de agua 1.0000 UD 856.94 856.94 0.00 856.94
COSTO/UD 5,185.64 671.42 5,857.06
Suministro e instalación de cambiador de bebé. Plataforma abatible de polietileno de alta densidad y resistencia. Gran resistencia a impactos, olores y bacterias. Incorpora cinturón de seguridad para sujetar al
11.04 bebé, ajustable fácilmente con una sola mano. Color gris claro. Con cavidad para stockar toallas limpias.
11.05 Suministro e instalación de papelera o zafacón en acero inoxidable, accionado de pedal abierto y cierre suave integrado, de metal con tapa. Extraíble forro interior de plástico recoge las fugas y derrames y
protege el basura bolsas de roturas. Funcionamiento silencioso y sistema de amortiguador reduce el ruido. Capacidad 20 lts
11.06 Suministro e instalación de espejo, de 1/4" de espesor con los contornos biselados con distanciadores en acero inoxidables de 1/2" en la parte inferior y de 1" en la parte superior para proporcionar una
inclinación que permita visibilidad para pacientes en silla de ruedas dimensiones: 18" x 36" (46 x 91 cm) ancho y alto.
Suministro e instalación dispensador combi/mixto de rollo o toalla zig-zag. Fabricado en plástico, color blanco de alta calidad y resistencia. Cerradura con llave y opción rollo/bobina o toalla zig-zag. Poco
11.07 voluminoso y fijado a pared mediante tacos y tornillos. Admite 1 Rollo de Papel continuo o anchura 240 mm y Ø 130 mm máximo o 400 toallas de papel tipo Z. Recarga rápida y fácil tanto de rollo/bobina como
de toallas. Fácil mantenimiento y limpieza.
Suministro e instalación de porta papeles rollo en continuo. Fabricado en plástico color blanco de alta calidad. Cerradura con llave y visor de control de carga.
11.1 Capacidad rollos de hasta 300m con diámetro máximo de 220 mm. y para rollos con mandril de 45 mm. de diámetro. Fácil limpieza y reposición del rollo. Robusto, resistente y de larga duración. Apertura
batiente frontal.
12.000 Sistema Hidrosanitario
A Movimiento de tierras
EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos
MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32
Alq. Compactador maquito 1.0000 M3 10.42 8.83 1.59 8.83 1.59 10.42
Peones ( 3 ) 3.0000 Hr 102.97 308.91 0.00 308.91
Combustible (3 Galones/día) 0.3800 Gls 221.60 187.80 33.80 71.36 12.85 84.21
Lubricante 0.1500 Gls 84.21 71.36 12.85 10.70 1.93 12.63
SUB-TOTAL 416.16
Rendimiento 3.0000 Mt³/Hr 416.16 138.72 138.72
Material granular 1.5000 Mt³ 650.00 975.00 0.00 975.00
Regado y mojado 1.0000 Mt³ 175.00 175.00 175.00
Herramienta 0.0200 % 1,113.72 943.83 169.89 18.88 3.40 22.27
COSTO/MT³ 1,307.60 3.40 1,311.00
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
Sub-Total (3) Mano de Obra 274.58 274.58
llave de paso de palanca 1.00 UD 135.00 114.41 20.59 114.41 20.59 135.00
Adaptador 1/2" 2.00 UD 20.00 16.95 3.05 33.90 6.10 40.00
Teflón 0.02 UD 20.00 16.95 3.05 0.34 0.06 0.40
Mano de obra coloc. 1.00 UD 465.00 465.00 0.00 465.00
COSTO/UD 613.64 26.76 640.40
llave de paso de palanca 1.00 UD 150.00 127.12 22.88 127.12 22.88 150.00
Adaptador 3/4" 2.00 UD 20.00 16.95 3.05 33.90 6.10 40.00
Teflón 0.02 UD 20.00 16.95 3.05 0.34 0.06 0.40
Mano de obra coloc. 1.00 UD 699.00 699.00 0.00 699.00
0.00 0.00 0.00
COSTO/UD 860.36 29.04 889.40
12.1 Accesorios y piezas tuberías agua potable (codos, tee, reducciones, uniones y otros)
Tuberías de ø1/2" PVC SCH-40 40.00 UD 112.56 95.39 17.17 3,815.70 686.83 4,502.53
Tuberías de ø3/4" PVC SCH-40 10.00 UD 147.95 125.38 22.57 1,253.84 225.69 1,479.53
Tuberías de ø1" PVC SCH-40 10.00 UD 210.13 178.07 32.05 1,780.73 320.53 2,101.26
Válvula de paso de bola tipo palanca ø1/2" 5.00 UD 640.40 542.71 97.69 2,713.56 488.44 3,202.00
Válvula de paso de bola tipo palanca ø3/4" 5.00 UD 889.40 753.73 135.67 3,768.64 678.36 4,447.00
COSTO/UD 13,332.47 2,399.84 15,732.32
C Suministro y Colocación Tuberías PVC SDR-41 (inc.excavación, asiento de arena & tapado)
Excavación, prof. 50Cms, Ancho 30 cm 0.15 M3 458.30 388.39 69.91 58.26 10.49 68.75
Tubo 4", pvc SDR-41 + 5% desp. 3.44 P 82.39 69.82 12.57 240.46 43.28 283.75
Asiento de arena e=10 cm + 10% Desp. 0.03 M3 1,334.54 1,130.97 203.57 37.32 6.72 44.04
Mano de obra coloc. Tubo 1.00 M 63.28 63.28 0.00 63.28
COSTO/ML 399.33 60.49 459.82
COSTO/PL 121.75 18.44 140.19
Excavación, prof. 50Cms, Ancho 30 cm 0.15 M3 458.30 388.39 69.91 58.26 10.49 68.75
Tubo 6", pvc SDR-41 + 5% desp. 3.44 P 621.94 527.06 94.87 1,815.21 326.74 2,141.95
Asiento de arena e=10 cm + 10% Desp. 0.03 M3 1,334.54 1,130.97 203.57 37.32 6.72 44.04
Mano de obra coloc. 1.00 M 34.68 34.68 0.00 34.68
COSTO/ML 1,945.47 343.94 2,289.41
COSTO/PL 593.13 104.86 697.99
12.13 Accesorios y piezas tuberías aguas negras (codos, tee, reducciones, uniones y otros)
Tuberías de ø4" PVC SDR-41 25.00 m 459.82 389.67 70.14 9,741.85 1,753.53 11,495.39
Tuberías de ø6" PVC SDR-41 25.00 m 2,289.41 1,940.18 349.23 48,504.54 8,730.82 57,235.36
COSTO/ML 58,246.40 10,484.35 68,730.75
12.14 Desagües pluviales Ø3" PVC SDR-32.5, h= 3.00 m, unión con cemento solvente. Incluye parte proporcional de piezas especiales, tapado ranura ambas caras en la pared.
Tubo 3"x19' PVC SDR-32.5+ 10% desp. 0.60 TUBO 2,917.55 2,472.50 445.05 1,483.50 267.03 1,750.53
Codo 3" PVC drenaje 1.00 UD 44.84 38.00 6.84 38.00 6.84 44.84
Reducción Yee de 4a3 pvc drenaje 1.00 UD 99.43 84.26 15.17 84.26 15.17 99.43
Codo 3"x45, pvc dren. 1.00 UD 33.04 28.00 5.04 28.00 5.04 33.04
Cemento pvc tangit, 50 ml + 25% desp. 0.25 UD 98.50 83.47 15.03 20.87 3.76 24.63
Abrazaderas de 3´´ de metal. 3.00 UD 55.00 46.61 8.39 139.83 25.17 165.00
Mano de obra por planta. 1.00 DÍA 707.49 707.49 0.00 707.49
COSTO/UD 2,501.95 323.00 2,824.96
12.16 Construccion de cámara de inspección 0.60mx0.60m (medidas interiores) (con altura variable), con bloques 6" (industrial), losa de fondo, incluye pañete interior pulido (fondo y muros) y tapa en hormigon
aramado
Carga y bote de material a mano 1.220 M3E RD$525.00 RD$0.00 RD$640.50 RD$0.00
Hormigón 1:3:5 ligado a mano en piso y losa 0.220 M3 RD$5,721.68 RD$848.64 RD$1,258.77 RD$186.70
Bloques de 6" (solo suministro) 30.000 UND RD$38.14 RD$6.86 RD$1,144.07 RD$205.80
Acero corrugado 3/8" 0.150 QQ RD$3,220.34 RD$579.66 RD$483.05 RD$86.95
Mortero 1:3 para colocación de bloques 0.130 M3 RD$6,132.22 RD$1,029.57 RD$797.19 RD$133.84
Mortero 1:4 para pañete pulido 0.075 M3 RD$6,467.18 RD$1,089.88 RD$485.04 RD$81.74
Mano de obra
Excavación a mano 0.90 M3N RD$823.75 RD$0.00 RD$741.38 RD$0.00
Mano de Obra cámara de inspección 1.00 UND RD$1,428.25 RD$0.00 RD$1,428.25 RD$0.00
Total/UND RD$6,978.25 RD$695.03 RD$7,673.28
F Ventilaciones
tubo 3" PVC SDR-41 0.50 UD 630.77 534.55 96.22 267.28 48.11 315.39
codo PVC drenaje 3" x 90° 1.00 UD 45.24 38.34 6.90 38.34 6.90 45.24
cemento PVC 0.00 GLS 1,799.00 1,524.58 274.42 5.49 0.99 6.48
instalación Ventilación de 3" 1.00 Ud 809.27 809.27 0.00 809.27
COSTO/UD 1,120.37 56.00 1,176.37
G Misceláneos
12.18 Suministro y colocación de tinacos de 530 gal. (incluye tuberías, piezas y mano de obra)
12.19 Corte con pulidora, ranura, perforaciones, anclaje c/ varillas, repello y terminación p/ colocación de ventilación
12.2 Suministro e instalación de equipo de bombeo para agua potable: 32 GPM vs 82 pies TDH, 2 HP. Incluye dispositivos y accesorios en succión desde cisterna e impulsión en cuarto de equipos. Totalmente
instalado, (arrancador, switch, manómetro)
12.21 Suministro e instalación de tanque hidroneumático 42 gls. Incluye todos los accesorios.
13.01 Suministro y colocación de mueble en acero inoxidable (tope y gabinete de piso) grado 316 (1.85x0.60)m, una poceta con respaldo en acero inoxidable, sin pocetas, moldeado en una sola pieza sin juntas ni
fisuras, postformado, doble bullnose, puertas con marcos dobles en doble tola de acero inoxidable, tiradores rectos en acero inoxidable. en trabajo Esteril
13.02 Suministro y colocación de mueble en acero inoxidable (tope y gabinete de piso) grado 316 (1.85x0.60)m, una poceta con respaldo en acero inoxidable, sin pocetas, moldeado en una sola pieza sin juntas ni
fisuras, postformado, doble bullnose, puertas con marcos dobles en doble tola de acero inoxidable, tiradores rectos en acero inoxidable.En trabajo no esteril
Suministro y colocación de gabinete de pared en acero inoxidable grado 316, calibre 18, moldeado en una sola pieza sin juntas ni fisuras, postformado, doble bullnose, puertas con marcos reforzados en doble
13.03 tola de acero inoxidable, tiradores rectos en acero inoxidable
13.04 Construcción de base de hormigón armado con malla electrosoldada p/gabinetes de piso, e=0.10m
Cortinas hospitalaria para formar cubículos tipo Oxford, antibacterial y antialergénicas, antihongos y antiacaros, resistente a las manchas, antiestática, libre de olores, color gris (deslizables sobre rieles, con
14.01 malla en la parte superior, retardadora de fuego, lavable y de planchado duradero) Cortina curva (Certificación NFPA 70) Riel de aluminio ancho 3.2cm / alto 2.9cm / grosor 1.3mm. Longitud minima de 4.00m
15.01 Suministro y colocación tope en granito natural (gris claro o blanco), con terminación doble bullnose (incluye soporte)
15.02 Muros counter completo (excavación, zapatas, bloques, relleno de reposición, pañete, cantos, pintura) (ver planos) en estacion de enfermeria
16.000 Rótulos
16.01 Suministro y colocación rotulación 35cmx10cm en acrílico transparente 3mm con vinil impreso en espejo, con base en vinil blanco (para contraste) y adosado a pared con tornillos decorativos de 1/4"
16.02 Suministro y colocación rotulación 70cmx30cm en acrílico transparente 3mm con vinil impreso en espejo, con base en vinil blanco (para contraste) y adosado a pared con tornillos decorativos de 1/4"
16.03 Suministro y colocación rotulación 70cmx30cm en acrílico transparente 3mm con vinil impreso en espejo, con base en vinil blanco (para contraste), colgante con cable de acero
16.04 Suministro y colocación rotulación en celtex de 3mm, con diseño en vinyl autoadhesivo ploteado. Medidas: 20x20 cm.
16.05 Suministro y colocación rotulación en celtex de 3mm, con diseño en vinyl autoadhesivo ploteado. Medidas: 10x10 cm.
16.06 Suministro y colocación rotulación 120cmx86cm en acrílico transparente 3mm con vinil impreso en espejo, con base en vinil blanco (para contraste) y adosado a pared con 6 tornillos decorativos de 1/4"
16.07 Suministro y colocación de letrero en acrílico 3D, letras independientes, volumétricas de acrílico rojo de 3mm con luces LED, de h=12" (EMERGENCIA)
16.08 Señalización ruta de evacuación, letreros en Sintra y vinil (8"x 8"), reflectivo, espesor 6mm
16.09 Imágenes ilustrativas en vinyl, a todo color, sobre acrílico de 5mm con base blanca y fijado con tornillos decorativos. Dimensiones: 24"x36"
16.1 Imágenes ilustrativas en vinyl, a todo color, sobre acrílico de 5mm con base blanca y fijado con tornillos decorativos. Dimensiones: 36"x36"
16.11 Imágenes ilustrativas en vinyl, a todo color, sobre acrílico de 5mm con base blanca y fijado con tornillos decorativos. Dimensiones: 36"x24"
17.01 Barras de apoyo pared-piso en acero inoxidable grado 304 de 1-1/2", en forma de L, longitud de 0.75m, h=0.75m, con cubrefalta en las bases de 3"
17.02 Barra de apoyo abatible en acero inoxidable grado 304 de 1 1/4", longitud de 0.75m, de giro vertical, con base atornillable en muro (0.10mx0.25m)
17.03 Barra de apoyo en acero inoxidable grado 304, inclinada en ducha, con cubre falta en las bases de 3"
17.04 Barra de apoyo en acero inoxidable grado 304, recta de 45cm, con cubrefalta en las bases de 3"
18.000 Herrería
18.01 Escalera tipo gato: en tubular de 1 1/2", en hierro galvanizado, totalmente construida e instalada (incluye baranda de llegada), fijación en base, muro y techo, terminación en pintura esmalte blanco. Altura
piso-antepecho=3.90m
19.000 Sistema Contra Incendios
19.01 Suministro y colocación de extintor tipo ABC químico seco de 9kg (incluye gabinete y rótulos: flecha e instrucciones)
19.02 Suministro y colocación de extintor de CO2 de 9kg (incluye rótulos: flecha e instrucciones)
A Preliminar:
242.0000 M2
Madera pino bruto americano 1"x4"x12 79.2000 P2 125.00 105.93 19.07 8,389.83 1,510.17 9,900.00
Madera pino bruto americano 2"x4"x12 158.4000 P2 125.00 105.93 19.07 16,779.66 3,020.34 19,800.00
Clavos dulce 2 1/2" 9.5000 LB 60.00 50.85 9.15 483.05 86.95 570.00
Cal 20 Kilos 6.0000 FDA 260.00 220.34 39.66 1,322.03 237.97 1,560.00
Hilo de gangorra 2.0000 U 169.00 143.22 25.78 286.44 51.56 338.00
Cinta métrica 0.1000 U 1,650.00 1,398.31 251.69 139.83 25.17 165.00
Brigada Topográfica 0.5000 DIA 17,700.00 15,000.00 2,700.00 7,500.00 1,350.00 8,850.00
Maestro 1.0000 DIA 2,471.25 2,471.25 0.00 2,471.25
Carpintero de Segunda Categoria 1.0000 DIA 1,058.75 1,058.75 0.00 1,058.75
Trabajador No calificado (TNC) 2.0000 Día 823.75 1,647.50 0.00 1,647.50
COSTO/UD 40,078.35 6,282.15 46,360.50
COSTO/MT² 165.61 25.96 191.57
Carretilla, Mandarria, cincel, pico y otros 5.00 % RD$2,176.88 RD$391.84 RD$108.84 RD$19.59
Total/UND RD$2,285.72 RD$19.59 RD$2,305.31
RD$114.29 RD$0.98 RD$115.27
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
B Movimiento de Tierra:
EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos
MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32
Alq. Compactador maquito 1.0000 M3 10.42 8.83 1.59 8.83 1.59 10.42
Peones ( 3 ) 3.0000 Hr 102.97 308.91 0.00 308.91
Combustible (3 Galones/día) 0.3800 Gls 221.60 187.80 33.80 71.36 12.85 84.21
Lubricante 0.1500 Gls 84.21 71.36 12.85 10.70 1.93 12.63
SUB-TOTAL 416.16
Rendimiento 3.0000 Mt³/Hr 416.16 138.72 138.72
Material granular 1.5000 Mt³ 650.00 975.00 0.00 975.00
Regado y mojado 1.0000 Mt³ 175.00 175.00 175.00
Herramienta 0.0200 % 1,113.72 943.83 169.89 18.88 3.40 22.27
COSTO/MT³ 1,307.60 3.40 1,311.00
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
20.09 Zapata de columnas C1 (1.60mx1.40mx0.45m) (Acero inferior: 1/2"@0.15m A.D.) (Hormigón Industrial 280kg/cm2).
Acero - Cuantía QQ/M3 1.05 QQ 3,800.00 3,220.34 579.66 3,367.84 606.21 3,974.05
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Alambre Dulce No. 18 2.0916 LB 100.00 84.74 15.25 177.25 31.90 209.15
Mano de Obra Acero 1.0458 qq 613.41 641.50 0.00 641.50
COSTO/MT³ 11,644.22 1,980.49 13,624.71
20.1 Zapatas de muros 15cm (0.45mx0.25m), acero long. 3ø3/8", ø3/8"@0.25m (Hormigón Industrial 280kg/cm2).
Acero - Cuantía QQ/M3 1.03 QQ 3,800.00 3,220.34 579.66 3,319.11 597.44 3,916.55
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Alambre Dulce No. 18 2.0613 LB 100.00 84.74 15.25 174.68 31.44 206.13
Mano de Obra Acero 1.0307 qq 613.41 632.22 0.00 632.22
COSTO/MT³ 11,583.64 1,971.26 13,554.90
20.11 Viga riostra (0.15mx0.25m) (4 Ø de 3/8" y est. 3/8" @0.20m (Hormigón Industrial 280kg/cm2).
Acero - Cuantía QQ/M3 3.66 QQ 3,800.00 3,220.34 579.66 11,786.44 2,121.56 13,908.00
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Alambre Dulce No. 18 7.3200 LB 100.00 84.74 15.25 620.31 111.66 731.97
Mano de Obra Acero 3.6600 qq 613.41 2,245.07 0.00 2,245.07
Encofrado viga de amarre Todo Costo 33.33 ML 112.33 3,743.94 0.00 3,743.94
COSTO/MT³ 25,853.40 3,575.59 29,428.99
Pavimento en hormigón hidráulico en área de marquesina y acceso con terminación en estampado tipo madera con color, e=0.15m, armado con acero 3/8"@0.20m (Hormigón 210kg/cm2). (incluye capa
20.12 protectora de sealer acabado brilloso y corte en concreto para juntas)
Acero - Cuantía QQ/M3 1.0000 QQ 3,800.00 3,220.34 579.66 3,220.34 579.66 3,800.00
Hormigón Industrial 210 Kg/cm2 1.1000 M3 7,205.15 6,106.06 1,099.09 6,716.66 1,209.00 7,925.66
Madera cepillada pino americano 1.0000 p2 125.00 105.93 19.07 105.93 19.07 125.00
Alambre Dulce No. 18 2.0000 LB 100.00 84.74 15.25 169.48 30.51 199.99
Preparación superficie - Ayudante AY 0.0667 DIA 1,058.75 70.62 0.00 70.62
Mano de Obra Acero 1.0000 QQ 401.30 401.30 0.00 401.30
Mano de obra frotado 6.6700 M2 182.40 1,216.61 0.00 1,216.61
COSTO/MT³ 11,900.94 1,838.24 13,739.18
20.13 Columna C2-Marq (0.30mx0.40m) (6 ø de 3/4") (6 ø de 1/2") est, de ø 3/8" @ 0.20m (Hormigón Industrial 280kg/cm2).
Acero - Cuantía QQ/M3 4.90 QQ 3,800.00 3,220.34 579.66 15,786.34 2,841.54 18,627.88
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Encofrado columna a Todo Costo 25.00 Ml 380.19 9,504.81 0.00 9,504.81
Alambre Dulce No. 18 9.8041 LB 100.00 84.74 15.25 830.82 149.55 980.37
Mano de Obra Acero 4.9021 QQ 637.40 3,124.58 0.00 3,124.58
COSTO/MT³ 36,704.19 4,333.46 41,037.65
20.14 Viga V4-Marq (0.20mx0.40m) (acero inferior: 2 de 3/4") (acero superior: 2 de 1/2") (acero inferior: 2 de 3/84") (est. 3/8"@0.20m) (Hormigón Industrial 280kg/cm2)
Acero - Cuantía QQ/M3 3.91 QQ 3,800.00 3,220.34 579.66 12,602.11 2,268.38 14,870.49
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Encofrado viga carga Todo Costo 12.50 Ml 730.00 9,125.00 0.00 9,125.00
Alambre Dulce No. 18 7.8266 LB 100.00 84.74 15.25 663.24 119.38 782.62
Mano de Obra Acero 3.9133 QQ 637.40 2,494.33 0.00 2,494.33
COSTO/MT³ 32,342.30 3,730.14 36,072.44
20.15 Losa en hormigon armado (Hormigon Industrial 280kg/cm2) (ver planos). H=0.15 m
Acero - Cuantía QQ/M3 1.28 QQ 3,800.00 3,220.34 579.66 4,122.03 741.97 4,864.00
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Encofrado viga carga Todo Costo 6.67 Ml 730.00 4,866.67 0.00 4,866.67
Alambre Dulce No. 18 2.5600 LB 100.00 84.74 15.25 216.94 39.05 255.99
Mano de Obra Acero 1.2800 QQ 637.40 815.87 0.00 815.87
COSTO/MT³ 17,479.14 2,123.39 19,602.53
E Muros:
20.16 Construcción de muros de bloques de hormigón de 6" (industrial), bastones ø3/8"@0.40m (con todos los huecos llenos)
bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 3/8" x 20' -G40 0.0420 QQ 3,800.00 3,220.34 579.66 135.25 24.35 159.60
alambre dulce #18 0.0840 Lbs 100.00 84.74 15.25 7.12 1.28 8.40
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 Kg/cms2 (1:3:5) 0.0590 m3 6,116.15 5,183.18 932.97 305.81 55.05 360.85
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.40 mts 13.0000 Ud 2.10 1.78 0.32 23.16 4.17 27.33
Andamios 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Herramientas (2%) 0.0200 P.A. 734.50 622.46 112.04 12.45 2.24 14.69
COSTO/MT² 1,596.98 214.06 1,811.04
bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 3/8" x 20' -G40 0.1184 QQ 3,800.00 3,220.34 579.66 381.27 68.63 449.90
alambre dulce #18 0.1590 Lbs 100.00 84.74 15.25 13.47 2.43 15.90
mezcla 1:3 0.0250 m3 6,993.84 5,926.98 1,066.86 148.17 26.67 174.85
Hormigón 140 Kg/cms2 (1:3:5) 0.0367 m3 6,116.15 5,183.18 932.97 190.05 34.21 224.26
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 1.34 0.24 17.39 3.13 20.52
Andamios 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Herramientas (2%) 0.0200 P.A. 1,032.30 874.83 157.47 17.50 3.15 20.65
COSTO/MT² 1,648.13 234.25 1,882.39
F Terminación de Superficies:
20.18 Fraguache.
Mortero 1:4 de empañete 1.50mm + 50% de 0.0020 M3 RD$6,467.18 RD$1,089.88 RD$12.93 RD$2.18
Regla madera americana cepillada 1"x4" / 2 0.1667 PT RD$105.93 RD$19.07 RD$17.66 RD$3.18
Mano de Obra
Mano de obra fraguache 1.00 M2 RD$45.19 RD$0.00 RD$45.19 RD$0.00
Total/UND RD$75.78 RD$5.36 RD$81.14
20.19 Pañete maestreado en muros, vigas y columnas (con mortero seco premezclado de agregados de granulometría controlada).
Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 6,312.04 5,349.18 962.85 117.15 21.09 138.23
Regla madera americana cepillada 1"x4" / 2 0.1667 PT 125.00 105.93 19.07 17.66 3.18 20.84
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra empañete exterior 1.0000 M2 187.07 187.07 0.00 187.07
COSTO/MT² 375.34 33.89 409.23
Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 6,312.04 5,349.18 962.85 117.15 21.09 138.23
Regla madera americana cepillada 1"x4" / 2 0.1667 PT 125.00 105.93 19.07 17.66 3.18 20.84
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra empañete exterior 1.0000 M2 270.64 270.64 0.00 270.64
COSTO/MT² 458.91 33.89 492.80
20.21 Cantos.
madera pino americano cepillada 0.8300 P2 125.00 105.93 19.07 87.92 15.83 103.75
mezcla 1:1.5:5 (pañete) 0.0050 m3 3,457.52 2,930.10 527.42 14.65 2.64 17.29
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 121.04 102.57 18.46 2.05 0.37 2.42
COSTO/ML 186.96 18.83 205.79
20.22 Gotero colgante.
Mortero 1:4 para empañete + 30% desp. 0.0200 M3 6,312.04 5,349.18 962.85 106.98 19.26 126.24
Regla madera americana cepillada 1"x4" / 1 0.3300 PT 125.00 105.93 19.07 34.96 6.29 41.25
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra goteros colgantes 1.0000 M2 190.00 190.00 0.00 190.00
COSTO/ML 385.41 35.17 420.58
Mortero 1:4 para empañete + 30% desp. 0.0200 M3 RD$6,467.18 RD$1,089.88 RD$129.34 RD$21.80
Regla madera americana cepillada 1"x4" / 1 0.33 PT RD$105.93 RD$19.07 RD$34.96 RD$6.29
Andamios en madera 1.00 M2 RD$50.24 RD$1.97 RD$50.24 RD$1.97
Mano de Obra
Mano de obra goteros colgantes 1.00 M2 RD$191.07 RD$0.00 RD$191.07 RD$0.00
Total/UND RD$405.61 RD$30.06 RD$435.67
G Pintura:
20.23 Imprimador acrílico de alto desempeño, 100% látex acrílico, resistente a la alcalinidad y a la eflorescencia (capa base, una mano). Incluye preparación de superficie.
Imprimador (primer) acrílico de alto desem 0.0800 GLS 650.00 550.85 99.15 44.07 7.93 52.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 137.00 116.10 20.90 2.32 0.42 2.74
COSTO/MT² 187.23 19.79 207.02
20.24 Suministro y aplicación de pintura acrílica en interiores, calidad superior (dos capas) (incluye preparación de superficie) (para techos)
pintura acrílica 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Andamios - Guidolas 0.5000 M2 63.09 53.47 9.62 26.73 4.81 31.55
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 272.74 35.18 307.93
pintura acrílica 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Andmios - Guidolas 0.5000 M2 63.09 53.47 9.62 26.73 4.81 31.55
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 272.74 35.18 307.93
A Preliminares
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos
MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
21.11 Zapatas de muros 45cm (0.45mx0.25m), acero long superior . 3ø3/8" y acero long inferior estribos ø3/8"@0.25m (Hormigón Industrial 210kg/cm2).
Acero - Cuantía QQ/M3 0.71 QQ 3,800.00 3,220.34 579.66 2,286.44 411.56 2,698.00
Hormigon Industrial 240 Kg/cm2 + 10% desp 1.1000 M3 7,700.00 6,525.43 1,174.58 7,177.97 1,292.03 8,470.00
Alambre Dulce No. 18 1.4200 LB 100.00 84.74 15.25 120.33 21.66 141.99
Mano de Obra Acero 0.7100 qq 613.41 435.52 0.00 435.52
COSTO/MT³ 10,020.26 1,725.25 11,745.52
bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 3/8" x 20' -G40 0.0420 QQ 3,800.00 3,220.34 579.66 135.25 24.35 159.60
alambre dulce #18 0.0840 Lbs 100.00 84.74 15.25 7.12 1.28 8.40
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 Kg/cms2 (1:3:5) 0.0590 m3 6,116.15 5,183.18 932.97 305.81 55.05 360.85
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.40 mts 13.0000 Ud 2.10 1.78 0.32 23.16 4.17 27.33
Andamios 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Herramientas (2%) 0.0200 P.A. 734.50 622.46 112.04 12.45 2.24 14.69
COSTO/MT² 1,596.98 214.06 1,811.04
21.13 Construccion de viga de amarre bajo nivel de piso, de hormigon armado, (0.15mx0.20m) (4 ø 3/8" estribo ø 3/8@0.25cm), acero grado 60, con bastones
Acero - Cuantía QQ/M3 3.6600 QQ 3,800.00 3,220.34 579.66 11,786.44 2,121.56 13,908.00
Vaciado y ligado Hormigón 1:2:4 - 10% desp 1.1000 M3 6,116.15 5,183.18 932.97 5,701.50 1,026.27 6,727.77
Alambre Dulce No. 18 7.3200 LB 100.00 84.74 15.25 620.31 111.66 731.97
Mano de Obra Acero 33.3300 ML 136.01 4,533.26 0.00 4,533.26
Encofrado viga de amarre Todo Costo 33.3300 ML 371.07 12,367.70 0.00 12,367.70
COSTO/MT³ 22,641.51 3,259.48 38,268.70
21.14 Dintel (acero inferior 3 de 1/2") (acero superior 2 de 3/8") (estribos 3/8"@0.20m) (Hormigón 210kg/cm2).
Acero - Cuantía QQ/M3 4.3303 QQ 3,800.00 3,220.34 579.66 13,945.19 2,510.13 16,455.32
Alambre No.18 8.6607 LBS 100.00 84.74 15.25 733.93 132.11 866.03
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 MT³ 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
M.O acero 26.6667 QQ 136.01 3,626.97 0.00 3,626.97
Encofrado dintel todo costo 26.6667 ML 526.68 14,044.73 0.00 14,044.73
COSTO/MT³ 39,808.44 3,984.61 43,793.06
21.15 Cierre de huecos en blocks 6", Ø3/8" @ 0.60 m & anclaje epóxico
bloques de 0.15 mts (6") TAVARES INDUSTRI 13.0000 Ud 44.00 37.29 6.71 484.75 87.25 572.00
acero 3/8" x 20' -G40 0.1184 QQ 3,800.00 3,220.34 579.66 381.27 68.63 449.90
alambre dulce #18 0.1590 Lbs 100.00 84.74 15.25 13.47 2.43 15.90
mezcla 1:3 0.0250 m3 6,993.84 5,926.98 1,066.86 148.17 26.67 174.85
Hormigón 140 Kg/cms2 (1:3:5) 0.0367 m3 6,116.15 5,183.18 932.97 190.05 34.21 224.26
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.40 mts 13.0000 Ud 2.10 27.33 0.00 27.33
anclaje epóxico 1.0000 Ud 250.00 211.86 38.14 211.86 38.14 250.00
Herramientas (2%) 0.0200 P.A. 1,037.80 879.49 158.31 17.59 3.17 20.76
COSTO/MT² 1,882.26 260.49 2,142.75
C Terminación de Superficies
21.16 Pañete maestreado en muros exteriores (con mortero seco premezclado de agregados de granulometría controlada)
Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 6,312.04 5,349.18 962.85 117.15 21.09 138.23
Regla madera americana cepillada 1"x4" / 2 0.1667 PT 125.00 105.93 19.07 17.66 3.18 20.84
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra empañete exterior 1.0000 M2 187.07 187.07 0.00 187.07
COSTO/MT² 375.34 33.89 409.23
21.17 Pañete maestreado en muros interiores (con mortero seco premezclado de agregados de granulometría controlada) (incluye mochetas) (incluye mochetas)
Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 6,312.04 5,349.18 962.85 117.15 21.09 138.23
Regla madera americana cepillada 1"x4" / 2 0.1667 PT 125.00 105.93 19.07 17.66 3.18 20.84
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra empañete exterior 1.0000 M2 187.07 187.07 0.00 187.07
COSTO/MT² 375.34 33.89 409.23
21.18 Cantos
madera pino americano cepillada 0.2590 P2 111.11 94.16 16.95 24.39 4.39 28.78
mezcla 1:1.5:5 (pañete) 0.0040 m3 7,513.44 6,367.32 1,146.12 25.47 4.58 30.05
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 58.83 49.86 8.97 1.00 0.18 1.18
COSTO/ML 133.19 9.15 142.34
21.19 Pañete de mochetas (con mortero 1:4)
D Terminación de Pisos
21.2 Suministro y colocación de baldosas de granito para pisos, fondo blanco (0.40mx0.40m), derretido de cemento blanco, (pulido, brillado y cristalizado); juntas de 2mm.
21.21 Suministro y colocación de zócalos de granito, fondo blanco (0.40mx0.07m) con cemento blanco, cristalizado; juntas de 2mm
21.22 Suministro y colocación piso de cerámica de alto tránsito, antideslizante, todo masa, espesor 8mm, formato 0.40mx0.40m, rectificada.
21.23 Losa de piso e=0.10m armado con malla electrosoldada 15x15 (hormigón industrial 210kg/cm2) (incluye separadores).
E Revestimientos
21.24 Suministro y colocación revestimiento de cerámica (0.30mx0.60m), color gris claro, rectificada (colocación junta trabada).
21.25 Suministro y colocación de cantos plástico (color semejante a cerámica) en esquinas cerámicas.
F Pinturas
21.26 Imprimador acrílico de alto desempeño, 100% látex acrílico, resistente a la alcalinidad y a la eflorescencia (capa base, una mano). Incluye preparación de superficie.
21.27 Suministro y aplicación de masillado de muros y techos con masilla resistente a la humedad (incluye preparación de superficie)
21.28 Pintura acrílica en exteriores, calidad superior (dos capas) (incluye preparación de superficie)
Suministro y aplicación de pintura hospitalaria antibacterial y antimicrobiana, acabado semigloss, calidad superior (dos capas) (incluye preparación de superficie) (autoprimer y pintura) (99.9% de efectividad)
21.29 incliuye techos
21.3 Suministro e instalación de puerta (1.20x2.10)m de acero inoxidable grado 316, calibre 19, satinada, cerradura de acero inoxidable, con visor en vidrio laminado de seguridad de 6mm 0.20mx0.55m, reforzada en
área de choque de camillas, con placa de empuje, instalada con cierre oculto en marco superior europea/americana y pivot en piso, con cierre hermético y felpa, garantía de 5 años
21.31 Suministro e instalación de puerta doble (2.00x2.10)m de acero inoxidable grado 316, calibre 19, satinada, cerradura de acero inoxidable, con visor en vidrio laminado de seguridad de 6mm 0.20mx0.55m,
reforzada en área de choque de camillas, con placa de empuje, instalada con cierre oculto en marco superior europea/americana y pivot en piso, con cierre hermético y felpa, garantía de 5 años
Suministro e instalación de puerta plomada (1.20x2.10)m de acero inoxidable grado 316, 1/32", satinada, cerradura de acero inoxidable, instalada con tres bisagras de acero inoxidable por hoja, con cierre
21.32 hermético, lamina de plomo de 2mm, garantía de 5 años
21.33 Suministro e instalación de puerta doble (1.70 x2.10)m, marco de aluminio P40, parte inferior en acero inoxidable grado 316 de 1/16", y parte superior en vidrio laminado de seguridad de 6 mm, con cerradura de
acero inoxidable, con barra de empuje en aluminio, garantía de 5 años
Suministro e instalación de puerta doble (2.00 x2.10)m, marco de aluminio P40, parte inferior en acero inoxidable grado 316 de 1/16", y parte superior en vidrio laminado de seguridad de 6 mm, con cerradura de
21.34 acero inoxidable, con barra de empuje en aluminio, garantía de 5 años
21.35 Suministro e instalación de puerta (1.20x2.10)m, marco de aluminio P40, parte inferior en acero inoxidable grado 316 de 1/16", y parte superior en vidrio laminado de seguridad de 6 mm, con cerradura de acero
inoxidable, con barra de empuje en aluminio, garantía de 5 años
21.36 Suministro e instalación de puerta de 0.70m@1.00m x2.10m, marco de aluminio P40, parte inferior y superior en vidrio laminado de seguridad de 6 mm, con cerradura de acero inoxidable, con barra de empuje
en aluminio, garantía de 5 años (P3)
Suministro e instalación puerta de polimetal (P-4) de 0.70m hasta 1.00m de ancho, con 2.10m de altura, lisa color blanco, llavín tipo palanca de acero inoxidable, con rejilla para ventilación 0.30mx0.30m
21.37 (ambos lados de puerta), con brazo hidráulico en cada hoja y tope fijo en puerta garantía de 5 años
21.38 Suministro y colocación ventana combinada vidrio fijo y ventana proyectada de aluminio P40 con laminado de seguridad, espesor de 6 mm (V-5). Marcos color blanco.
21.39 Suministro e instalación de vidrio fijo en aluminio P-92, con marcos de aluminio de 1 1/2, vidrio con laminado de seguridad de 6mm, marcos color blanco (V-04)
21.4 Suministro e instalación de ventana corredera en aluminio P-92, con marcos de aluminio de 1 1/2, vidrio con laminado de seguridad de 6mm y operadores de palanca en los extremos, marcos color blanco
21.41 Suministro y colocación de laminado de protección solar en ventanas (transmisión de luz visible 5%) (medidas por áreas de vidrio en ventanas)
H Instalación Sanitaria
21.42 Suministro e instalación lavamanos de porcelana sanitaria antibacterial completo, con pedestal, tamaño de mínimo de 54cmx47cm, con mezcladora push temporizado (de latón cromado, resistente a corrosión)
(cierre 15±5s, caudal: 6 l/min regulable) incluye salidas de agua potable y drenaje,
Suministro e instalación de inodoro elongado de porcelana sanitaria antibacterial completo, one piece de tanque, pulsador palanca, tamaño mínimo (76x44x75)cm de bajo consumo y que cumplan con los
21.43 requerimientos para accesibilidad, color blanco, c/asiento y tapa, incluye salida de agua y de drenaje
21.44 Suministro e instalación de desagüe de piso Ø2", PVC SDR 41, rejilla acero inoxidable (cuadrada 4"x4"), sifonada (completa)
21.45 Salida agua potable y desagüe p/meseta en acero inoxidable con fregadero
21.46 Suministro e instalación de cambiador de bebé. Plataforma abatible de polietileno de alta densidad y resistencia. Gran resistencia a impactos, olores y bacterias. Incorpora cinturón de seguridad para sujetar al
bebé, ajustable fácilmente con una sola mano. Color gris claro. Con cavidad para stockar toallas limpias.
21.47 Suministro e instalación de papelera o zafacón en acero inoxidable, accionado de pedal abierto y cierre suave integrado, de metal con tapa. Extraíble forro interior de plástico recoge las fugas y derrames y
protege el basura bolsas de roturas. Funcionamiento silencioso y sistema de amortiguador reduce el ruido. Capacidad 20 lts
21.48 Suministro e instalación de espejo, de 1/4" de espesor con los contornos biselados con distanciadores en acero inoxidables de 1/2" en la parte inferior y de 1" en la parte superior para proporcionar una
inclinación que permita visibilidad para pacientes en silla de ruedas dimensiones: 18" x 36" (46 x 91 cm) ancho y alto.
Suministro e instalación dispensador combi/mixto de rollo o toalla zig-zag. Fabricado en plástico, color blanco de alta calidad y resistencia. Cerradura con llave y opción rollo/bobina o toalla zig-zag. Poco
21.49 voluminoso y fijado a pared mediante tacos y tornillos. Admite 1 Rollo de Papel continuo o anchura 240 mm y Ø 130 mm máximo o 400 toallas de papel tipo Z. Recarga rápida y fácil tanto de rollo/bobina como
de toallas. Fácil mantenimiento y limpieza.
21.5 Jabonera en plástico color blanco p/lavamanos, empotrada en muro
21.52 Secador de manos, secado rápido en acero inoxidable, manos libres automático infrarrojo / 1800w /motor con escobillas/ luz led
Suministro e instalación de porta papeles rollo en continuo. Fabricado en plástico color blanco de alta calidad. Cerradura con llave y visor de control de carga.
21.53 Capacidad rollos de hasta 300m con diámetro máximo de 220 mm. y para rollos con mandril de 45 mm. de diámetro. Fácil limpieza y reposición del rollo. Robusto, resistente y de larga duración. Apertura
batiente frontal.
I Topes y/o Gabinetes en Acero Inoxidable
21.54 Suministro y colocación de mueble en acero inoxidable (tope y gabinete de piso) grado 316 (1.35x0.60)m, una poceta con respaldo en acero inoxidable, sin pocetas, moldeado en una sola pieza sin juntas ni
fisuras, postformado, doble bullnose, puertas con marcos dobles en doble tola de acero inoxidable, tiradores rectos en acero inoxidable. cura
Suministro y colocación de mueble en acero inoxidable (tope y gabinete de piso) grado 316 (1.35x0.60)m, una poceta con respaldo en acero inoxidable, sin pocetas, moldeado en una sola pieza sin juntas ni
21.55 fisuras, postformado, doble bullnose, puertas con marcos dobles en doble tola de acero inoxidable, tiradores rectos en acero inoxidable. yeso
21.56 Suministro y colocación de mueble en acero inoxidable (tope y gabinete de piso) grado 316 (1.35x0.60)m, una poceta con respaldo en acero inoxidable, sin pocetas, moldeado en una sola pieza sin juntas ni
fisuras, postformado, doble bullnose, puertas con marcos dobles en doble tola de acero inoxidable, tiradores rectos en acero inoxidable. medicaicion
21.57 Suministro y colocación de gabinete de pared en acero inoxidable grado 316, calibre 18, moldeado en una sola pieza sin juntas ni fisuras, postformado, doble bullnose, puertas con marcos reforzados en doble
tola de acero inoxidable, tiradores rectos en acero inoxidable
21.58 Construcción de base de hormigón armado con malla electrosoldada p/gabinetes de piso, e=0.10m
J Cortinas Hospitalarias
Cortinas hospitalaria para formar cubículos tipo Oxford, antibacterial y antialergénicas, antihongos y antiacaros, resistente a las manchas, antiestática, libre de olores, color gris (deslizables sobre rieles, con
21.59 malla en la parte superior, retardadora de fuego, lavable y de planchado duradero) Cortina recta (Certificación NFPA 70) Riel de aluminio ancho 3.2cm / alto 2.9cm / grosor 1.3mm. Longitud minima de 2.00m
K Barras de Seguridad
21.6 Barras de apoyo pared-piso en acero inoxidable grado 304 de 1-1/2", en forma de L, longitud de 0.75m, h=0.75m, con cubre falta en las bases de 3"
21.61 Barra de apoyo abatible en acero inoxidable grado 304 de 1 1/4", longitud de 0.75m, de giro vertical, con base atornillable en muro (0.10mx0.25m)
21.62 Barra de apoyo en acero inoxidable grado 304, inclinada en ducha, con cubre falta en las bases de 3"
21.63 Barra de apoyo en acero inoxidable grado 304, recta de 45cm, con cubre falta en las bases de 3"
L Protección de paredes
21.64 Suministro e instalación de esquinero (retenedor en vinil) con cover de vinyl y tapa superior e inferior, color gris oscuro, 2"x2" h=1.80m
Suministro e instalación bumpers tipo pasamanos protector de pared de 5 1/2". Perfil de aluminio firme continuo, parachoque continuo y cubiertas de vinyl rígido resistentes a los rayones y a las manchas. (Ver
21.65 detalles)
21.67 Muros de bloques de hormigón de 6", bastones ø3/8"@0.40m. (todos los huecos llenos) con resina epoxica
21.7 Tope en granito natural fondo gris oscuro, con terminación doble redondeada (incluye soporte)
21.71 suministro y colocacion de vidrio fijo (tubos de acero inoxidable de 1 1/2 x 1 1/2y conectores media luna )6mm
22.000 Terminación de Techos Exterior
22.02 Demolición de fino y zabaletas (considerar espesor promedio de 10cm) (incluye bajar y acarrear el material)
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
22.06 Suministro y aplicación de lechada de cemento gris (pre y/o post construcción de fino)
22.07 Construcción de fino en techo plano (con mortero 1:3) (espesor promedio de 10cm) (con pendiente hacia desagües) semipulido con helicóptero.
madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3 0.0400 m3 6,116.15 5,183.18 932.97 207.33 37.32 244.65
fino en techo horiz. sin incl. subida de mater 1.0000 m2 164.22 164.22 0.00 164.22
Mano de Obra Subida materiales - Ayudant 0.2000 DIA 1,058.75 211.75 0.00 211.75
Herramientas (2%) 0.0200 P.A. 246.27 208.70 37.57 4.17 0.75 4.93
COSTO/MT² 588.85 38.32 627.17
Zabaleta de Techo
Volumen Análisis 1.00 ML
Materiales y Equipos
Mortero 1:3 + 10% desperdicio 0.015 M3 6,132.22 RD$1,029.57 RD$91.98 RD$15.44
Cemento adicional 0.05 fda RD$381.36 RD$68.64 RD$19.07 RD$3.43
Mano de obra
Mano de obra zabaleta 1.00 ML RD$88.11 RD$0.00 RD$88.11 RD$0.00
Mano de Obra Subida materiales - Ayudante AY 0.02 DIA RD$1,058.75 RD$0.00 RD$21.18 RD$0.00
Total/UND RD$220.34 RD$18.87 RD$239.21
22.09 Construcción de base p/ compresores de A/A (dimensiones 1.00x1.20x0.10m) en hormigón armado f´c=180kg/cm2 con malla electrosoldada 15x15 (incluye zabaleta en perímetro de base).
Horm. 1:2:4 mezclado a mano + 10% desper 0.1320 m3 6,116.15 5,183.18 932.97 684.18 123.15 807.33
Acero malla D3xD3 (15 x15)cm 0.0125 rollo 15,500.00 13,135.59 2,364.41 164.19 29.56 193.75
Madera de pino americano 1.0000 p2 125.00 105.93 19.07 105.93 19.07 125.00
Zabaleta 4.4000 ml 311.52 264.00 47.52 1,161.58 209.08 1,370.67
Colocac. Acero malla 1.2000 m2 48.14 57.77 0.00 57.77
Piso frotado 1.2000 m2 181.35 217.63 0.00 217.63
Mano de Obra Subida materiales - Ayudant 0.1000 dia 1,058.75 105.88 0.00 105.88
COSTO/UD 2,497.16 380.86 2,878.02
Materiales y Equipos
Horm. 1:2:4 mezclado a mano + 10% desperdicios 0.13 m3 RD$6,103.04 RD$917.28 RD$805.60 RD$121.08
Acero malla D3xD3 (15 x15)cm 0.01 rollo RD$13,135.59 RD$2,364.41 RD$164.19 RD$29.56
Madera de pino americano 1.00 p2 105.93 RD$19.07 RD$105.93 RD$19.07
Zabaleta 4.40 ml RD$220.34 RD$18.87 RD$969.50 RD$83.03
Mano de obra
Colocac. Acero malla 1.200 m2 RD$48.14 RD$0.00 RD$57.77 RD$0.00
Piso frotado 1.200 m2 RD$182.40 RD$0.00 RD$218.88 RD$0.00
Mano de Obra Subida materiales - Ayudante AY 0.10 dia RD$1,058.75 RD$0.00 RD$105.88 RD$0.00
Total/UND RD$2,427.75 RD$252.74 RD$2,680.49
22.1 Construcción de base p/ tinaco (2.00mx2.00mx0.1m)en hormigón armado f´c=180kg/cm2 con malla electrosoldada 15x15 (incluye zabaleta en perímetro de base).
Horm. 1:2:4 mezclado a mano + 10% desper 0.4000 m3 6,116.15 5,183.18 932.97 2,073.27 373.19 2,446.46
Acero malla D3xD3 (10 x10)cm 0.0400 rollo 15,500.00 13,135.59 2,364.41 525.42 94.58 620.00
Madera de pino americano 1.0000 p2 125.00 105.93 19.07 105.93 19.07 125.00
Zabaleta 8.0000 ml 311.52 264.00 47.52 2,111.97 380.15 2,492.12
Colocac. Acero malla 4.0000 m2 48.14 192.56 0.00 192.56
Piso frotado 4.0000 m2 181.35 725.42 0.00 725.42
Mano de Obra Subida materiales - Ayudant 0.1500 dia 1,058.75 158.81 0.00 158.81
COSTO/UD 5,893.38 866.99 6,760.37
Horm. 1:2:4 mezclado a mano + 10% desperdicios 0.40 m3 RD$6,103.04 RD$917.28 RD$2,441.22 RD$366.91
Acero malla D3xD3 (10 x10)cm 0.04 rollo RD$13,135.59 RD$2,364.41 RD$547.32 RD$98.52
Madera de pino americano 1.00 p2 RD$105.93 RD$19.07 RD$105.93 RD$19.07
Zabaleta 8.00 ml RD$220.34 RD$18.87 RD$1,762.72 RD$150.96
Mano de obra
Colocac. Acero malla 4.000 m2 RD$48.14 RD$0.00 RD$192.56 RD$0.00
Piso frotado 4.000 m2 RD$182.40 RD$0.00 RD$729.60 RD$0.00
Mano de Obra Subida materiales - Ayudante AY 0.15 dia RD$1,058.75 RD$0.00 RD$158.81 RD$0.00
Total/UND RD$5,938.16 RD$635.46 RD$6,573.62
22.11 Construcción de juntas (sellado con poliuretano) e=4"
Plancha e=4" foam 3.00mx1.20m 0.1500 UD 2,000.00 1,694.92 305.08 254.24 45.76 300.00
Mano de obra 0.2000 % 300.00 60.00 0.00 60.00
COSTO/UD 314.24 45.76 360.00
22.13 Construcción de protector de junta en techo (incluyendo bloques, terminación, Zabaleta, hormigón, placa galvanizada, cantos) (ver planos)
Muro de bloques de 15cm, bastone@0.40m 0.8 M2/M 1,892.75 1,604.03 288.72 1,283.22 230.98 1,514.20
Hormigón armado techo superior 0.07 M3/M 358.05 64.45 25.06 4.51 29.58
Placa galvanizada 1 M/M 174.40 31.39 174.40 31.39 205.79
Pañete 1.64 M2/M 422.50 0.00 0.00 0.00 0.00 0.00
Cantos 3 M/M 205.79 0.00 0.00 0.00 0.00 0.00
COSTO/UD 1,482.68 266.88 1,749.57
Suministro y colocación de impermeabilizante de techo con lona asfáltica granulada de 5 kg/cm2 (procedencia europea), (a ser colocado toda la membrana adherida a la superficie, sin arrugas, con
22.14 imprimación a dos manos de emulsiones asfálticas de calidad superior, con solapes de 10 cm en las uniones completa, con el selle del borde del solape), debe incluir prueba de estanqueidad para todas las áreas
impermeabilizadas, incluye limpieza de superficie, garantía de diez años.
23.000 AREAS EXTERIORES
23.01 Construcción de acera en hormigón armado con malla electrosoldada , D2.3 x 2.3 10x10CMS, H.I. 180 Kg/cm2 (frotada y violinada).
Rampa Personas Con Discapacidad. Construcción área de descanso (1.80x3.30) mts y construcción rampa de minusválidos para una pendiente de 8% y L= 10 mts, divida de en dos tramos. inc. replanteo y
23.02 marcado, inc. excavación en tierra, relleno de reposición, zapata de muros (0.45x0.25) mts, dos (2) líneas de blocks 6", fraguache, pañete liso en muros b.n.p., cantos, rampa de hormigón (e=0.10 mts), 180
kg/cm2 (ligadora), malla electrosoldada D2.3x2.3 20x20, terminación frotada, recolección y traslado de escombros en carretillas hasta punto de bote, limpieza, herramientas y mano de obra.
23.03 Suministro e instalación de baldosas de vibrazo para pisos, (0.40mx0.40m), derretido, juntas de 2mm.
24.000 Paisajismo
25.000 Misceláneos
25.01 Suministro y colocación de paragomas de hormigón (incluye fijación, terminación y pintura). 12.00 cm x 2.00 m.
A Media Tensión
26.002 Suministro e instalación de Estructura PR-202 (Montaje de base para seccionador fusible y pararrayos - fijación en cruceta) Norma DECON
26.003 Suministro e izaje de HPV-40-500 (Poste de hormigón pretensado vibrado de 40 pies y 500 daN)
26.004 Excavacion para poste de media tensión
EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos
MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32
Bajada y subida de acometida de media tensión, Inlcuye: 02 - Conectores recto PVC de 3", 02 - Condulet 3" para IMC, 02 - Curva PVC de 3", 04 - Tubos IMC de 3", 02 - Curva IMC de 3", 02 - Conector HUB de 3",
26.007 02 - Coupling IMC de 3", 03 - Cono de alivio completo (con la varilla terminal), 03 - Elbow conector, 15 - Abrazadera Unistrut de 3", 02 - Riel chanel de 1/2", 30 - Tornillo cabeza hexagonal 1/4 x 2 " con tarugo y
arandela, 01 - Instalacion de terminacion a cable URD, 01 - Fijacion de tuberia IMC
26.008 Zanja IC-302 de 1.20m x 0.4m (Incluye tuberia PVC de 3")
26.011 Suministro e instalación de Transformador tipo pad mounted de 150kVA, 12.47/7.2kV - 208/120V, delta-delta, radial feed, frente muerto, sumergido en aceite.
26.022 Registro de medición de tierra construido con Tubo PVC de 8" y tapa roscable
D Equipos BT
26.029 Suministro e Instalación de Encloused Breaker de 400 Amperes, trifásico, 120/208Vac. 60Hz. Barra de neutro para 100% de la carga. En gabinete Nema 1 pintado con pintura electrostática en polvo, secada en
horno a 200 grados Celsius.
26.03 Suministro e Instalación de Interruptor de Transferencia Automática (ITA) con breaker motorizado de 400 Amperes, trifásico, 120/208Vac., 3Ph. 60Hz. Con barra de Cobre para 600 Amperes de 1 ½˝ x ¼˝. Barra
de neutro para 100% de la Carga. En gabinete Nema 1 pintado con pintura electrostática en polvo, secada en horno a 200 grados Celsius.
26.031 Suministro e Instalación de Interruptor de Transferencia Manual (ITM) con breaker de 400 Amperes, trifásico, 120/208Vac., 3Ph. 60Hz. Con barra de Cobre para 600 Amperes de 1 ½˝ x ¼˝. Barra de neutro para
100% de la Carga. En gabinete Nema 1 pintado con pintura electrostática en polvo, secada en horno a 200 grados Celsius.
Suministro e Instalación de Encloused Breaker de 400 Amperes, trifásico, 208/120Vac. 60Hz. En gabinete Nema 3, con tola mínimo 16, pintado con pintura electrostática en polvo, secada en horno a 200 grados
26.032 Celsius. Con doble cierre, dos portacandados con Planchuela de Hierro de 2˝x 3/16˝ con agujero para ⅜˝. Además, con Cerradura de puño con cierre en tres puntos, con Planchuela de 1˝x 3/16˝. (Receptáculo
móvil)
Suministro e instalación de Panel Board General de 400 Amperes, trifásico, 208/120Vac., 3Ph. 60Hz. Con barra de Cobre para 600 Amperes de 1 ½˝ x ¼˝. En gabinete Nema 1 pintado con pintura electrostática
en polvo, secada en horno a 200 grados celsius. Compuesto por:
MBP.400A/3,
02 Breakers 170A/3P
26.033 02 Breakers 150A/3P
01 Breakers 100A/3P
01 Breakers 70A/3P
05 Breakers 40A/3P
02 Disponible
Suministro e instalación de Panel Board Emergencia Nema 1 de125 Amperes, trifásico, 208/120Vac., 3Ph. 60Hz. Con barra de Aluminio para 225 Amperes de ¾˝ x ¼˝ y Planchuela de aluminio de 1˝ x ⅛˝. En
gabinete Nema 1 pintado con pintura electrostática en polvo, secada en horno a 200 grados celsius. Compuesto por:
26.034 MBP.125A/3,
01 Breakers 60A/3P
04 Breakers 40A/3P
03 Disponible
E Paneles de Distribución
26.035 PA1-Panel de Iluminación, trifásico, con barras de aluminio de 125 amp. De 12 espacios. Compuesto por:
10 Breaker 20A/1
PEB1-Panel de Tomacorrientes, trifásico, con barras de aluminio de 125 amp. De 18 espacios. Compuesto por:
26.036 08 Breaker 20A/1
PUPS1-Panel de Tomacorrientes UPS, trifásico, con barras de aluminio de 125 amp. De 18 espacios. Compuesto por:
26.037 12 Breaker 20A/1
01 Breaker 40A/3
26.038 PC1-Panel Climatización, trifásico, con barras de aluminio de 225 amp. De 54 espacios. Compuesto por: 19 Breaker 20A/2, 01 Breaker 30A/2,
F Alimentadores
26.039 Alimentador desde Transformador pad mounted de 150kVA a Enclosed breaker de transformador a 400A, compuesto por: 3 Alambre AWG No. 2/0 THHN por fase 3 Alambre AWG No. 2/0 THHN neutro 1
Alambre AWG No. 1/0 THHN tierra 2 tubería IMC 3".
26.04 Alimentador desde Enclosed breaker de transformador a Interruptor de transferencia automática (ITA), compuesto por: 3 Alambre AWG No. 2/0 THHN por fase 3 Alambre AWG No. 2/0 THHN neutro 1
Alambre AWG No. 1/0 THHN tierra 2 tubería IMC 3".
Alimentador desde Interruptor de transferencia automática (ITA) a Interruptor de transferencia manual (ITM), compuesto por: 3 Alambre AWG No. 2/0 THHN por fase, 3 Alambre AWG No. 2/0 THHN neutro,
26.041 1 Alambre AWG No. 1/0 THHN tierra, 2 tubería EMT 3".
Alimentador desde Interruptor de transferencia manual (ITM) a Enclosed breaker de generador, compuesto por: 3 Alambre AWG No. 2/0 THHN por fase, 3 Alambre AWG No. 2/0 THHN neutro, 1 Alambre
26.042 AWG No. 1/0 THHN tierra, 2 tubería EMT 3".
Alimentador desde Enclosed breaker de generador a Generador, compuesto por: 3 Alambre AWG No. 2/0 THHN por fase, 3 Alambre AWG No. 2/0 THHN neutro, 1 Alambre AWG No. 1/0 THHN tierra, 2
26.043 tubería EMT 3".
26.044 Alimentador desde Interruptor de transferencia manual (ITM) a Receptáculo Móvil, compuesto por: 3 Alambre AWG No. 2/0 THHN por fase, 3 Alambre AWG No. 2/0 THHN neutr, 1 Alambre AWG No. 1/0
THHN tierra, 2 tubería EMT 3".
26.045 Alimentador desde Interruptor de transferencia automática (ITA) a Panel Board de Emergencia, compuesto por: 3 Alambre AWG No. 2/0 THHN por fase, 3 Alambre AWG No. 2/0 THHN neutro, 1 Alambre AWG
No. 1/0 THHN tierra, 2 tubería PVC/EMT 3".
26.046 Alimentador desde Panel board de Emergencia a PA Panel de iluminacion, compuesto por: 1 Alambre AWG No. 8 THHN por fase, 1 Alambre AWG No. 8 THHN para neutro, 1 Alambre AWG No. 10 THHN tierra,
1 tubería EMT 1".
26.047 Alimentador desde Panel board de Emergencia a PB Panel de Tomacorriente, compuesto por: 1 Alambre AWG No. 8 THHN por fase, 1 Alambre AWG No. 8 THHN para neutro, 1 Alambre AWG No. 10 THHN
tierra, 1 tubería EMT 1".
26.048 Alimentador desde Panel Board de Emergencia a Panel de Climatización, compuesto por: 2 Alambre AWG No. 1/0 THHN por fase, 2 Alambre AWG No. 1/0 THHN neutro, 1 Alambre AWG No. 3/0 THHN tierra,
1 tubería IMC 2".
Alimentador desde Panel board de Emergencia a PUPS Panel de tomacorriente de UPS, compuesto por: 1 Alambre AWG No. 8 THHN por fase, 1 Alambre AWG No. 8 THHN para neutro, 1 Alambre AWG No. 10
26.049 THHN tierra, 1 tubería EMT 1".
G Sistema de Alimentación Ininterrumpida (UPS)
Suministro e instalación de UPS-10 kVA, 208/120Vac., (3Ph + N + T), 60Hz, Topología: Doble conversión el línea, garantía de un año en piezas y servicios. Incluye: Serie de baterias modulares inteligentes de
26.05 7.2Ah internas, Autonomía: de 15 minutos (minimo) al 100% de la carga. Incluye instalación, arranque y materiales.
Suministro e instalación de Sistema General de By-Pass para UPS de 40A/3, 208/120Vac., 3Ph. 60Hz. Nema 1, incluye:
1 Breaker Normal 40A/3
1 Breaker Bypass 40A/3
26.051 1 Breaker UPS 40A/3
2 Luces indicadoras
2 Interruptor frontal
Embarrado y conectores para 100% de la carga.
Alimentador desde Bypass UPS 40A a PUPS-Panel de Tomacorrientes UPS1 compuesto por:
1 Alambre AWG No. 8 THHN por fase
26.052 1 Alambre AWG No. 8 THHN neutro
1 Alambre AWG No. 10 THHN tierra
1 tubería EMT 1".
H Salidas Eléctricas
26.056 Salida para Interruptor Sencillo Aterrizado, 15A, 120V - Incluye accesorio Termoplástico con placa frantal sin tornillos con terminación en blanco
26.057 Salida para Interruptor Doble Aterrizado 15A, 120V - Incluye accesorio Termoplástico con placa frantal sin tornillos con terminación en blanco
26.058 Salida para Interruptor Triple Aterrizado 15A, 120V - Incluye accesorio Termoplástico con placa frantal sin tornillos con terminación en blanco
26.059 Salida para Tomacorriente Doble Aterrizado 15A, 120V - Incluye accesorio Termoplástico con placa frantal sin tornillos con terminación en blanco
26.06 Salida para Tomacorriente Doble Aterrizado 15A Grado Hospitalario, 120V - Incluye accesorio Termoplástico con placa frantal sin tornillos con terminación en blanco
26.061 Salida para Tomacorriente Doble Aterrizado 15A para UPS, 120V - Incluye accesorio Termoplástico con placa frantal sin tornillos con terminación en naranja
26.062 Salida para Tomacorriente Doble Aterrizado 15A Grado Hospitalario para UPS, 120V - Incluye accesorio Termoplástico con placa frantal sin tornillos con terminación en naranja
26.063 Salida de extractor de baño de plafón 11"x11" . Incluye extractor y ventanilla exterior.
26.064 Salida para Punto de data, Camara y Control de acceso. Incluye cable UTP Cat 6 y Faceplate con puerto RJ45.
I Suministro e Instalación
26.065 Suministro e instalación de Lámpara Led Adosada 2x2´ Tipo Panel Sellado, 48VA, 80-240V, 60Hz, 6000-7000K, lúmenes ≥ 3200, 80RA, IP20.
26.066 Suministro e instalación de Lámpara Led empotrada 2x4’ Tipo Panel Sellado, 62VA, 80-240V, 60HZ, 6000-7000K, lúmenes ≥ 6000 Lum, IRC ≥ 80, IP44.
26.067 Suministro e instalación de Downlight Led empotrada redonda con 6’’-9’’ de diámetro, 23VA, 120V, 60HZ, 6000-7000K, lúmenes ≥ 400 Lum, IRC ≥ 80, IP54.
Suministro e instalación de Lámpara de Emergencia de dos luces, auto- energizadas (con baterías incorporadas), autonomía mínima de dos horas de funcionamiento (120 min). 5.4W, 120-277V. Adosada a la
26.068 pared, a instalar a 20 cm B.N.P.T.
26.069 Suministro e instalación de Fotocelda para luminaria exterior 120V, IP65, 1000W.
J Sistema de Vigilancia IP
26.07 Patch cord cat-6 (cable flexible de alta calidad. Patch cords acabados y probados) (aliviador de tensión moldeado en caliente).
26.073 Organizador
26.074 NVR de 16 Canales, que soporte hasta 16 cámaras, compresión H.264, hasta 10 TB de capacidad para cada HDD, exportación de video AVI/RAW. Resolución Máxima Local: hasta 4MP; Remoto: hasta10MP.
Zoom digital. Compresión de audio PCM, G.711. Con 2 puerto(s), USB 2.0. Puerto HDMI (3 años de garantía) (Licencia libre de 16 canales incluida).
26.075 Disco duro 4 TB, Buffer 64MB, Dispositivo compatible: grabadora de video en red, capacidad de almacenamiento 4TB, disco duro especial para vigilancia, interfaz de unidad SATA, tamaño de HDD de 3.5". SATA
6.0 Gb/s, velocidad 5400 rpm.
26.076 Cámara IP Tipo Bullet, 2 Megapíxel, día/noche con IR LED adaptativo hasta 40 metros, lente 2.8mm-12mm, IP66, PoE.
26.077 Cámara IP Tipo Domo, 2 Megapíxel, día/noche con IR LED adaptativo hasta 30 metros, lente 2.8mm-12mm, PoE.
26.078 Gabinete 12 U, instalación estándar de 19¨, paneles laterales extraíbles, cerraduras laterales, entrada de cable en la cubierta superior y el panel inferior, protección IP20.
26.079 Pantalla 32¨, Led, resolución 1080p, entrada HDMI, entrada VGA.
26.08 Switch de 24 puertos, PoE 10/100TX+2 10/100/1000TX compartidos 2 1000X, administrado, estándar 802,3at/af, total de PoE 360 vatios, temperatura de funcionamiento 0-50 ºC.
26.088 Suministro e instalación de cableado con cable UTP cat 6 (alta calidad hasta punto de salida
26.089 Suministro e instalación de Face plate
L Climatización
26.092 Salida eléctrica en alambre No. 10 para alimentación de aire acondicionado en tuberia IMC/LT de 3/4
26.093 Preinstalación y desgue de aire acondicionado, incluye: 2'' de tubería PVC de 2'' para tubería de cobre 2'' de tubería PVC de 3/4'' para alambre de goma 4'' de tubería PVC de 3/4'' para desague 3 curva PVC de
2'' 1 curva PVC de 3/4'' 3'' alambre de goma 14/3.
26.094 Suministro e instalación de Unidad de aire acondicionado tipo Split Inverter de 12mil BTU SEER +18
26.095 Suministro e instalación de Unidad de aire acondicionado tipo Split Inverter de 18mil BTU SEER +18.
ANALISIS VARIOS
EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos
MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32
Bote de material
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
Materiales:
cemento gris 6.3500 Fds 480.00 406.78 73.22 2,583.05 464.95 3,048.00
arena gruesa ITABO LAVADA (de PLANTA) 0.5400 m3 1,500.00 810.00 0.00 810.00
gravilla 3/4 @ 3/8" 0.7300 m3 1,500.00 1,095.00 0.00 1,095.00
agua 64.0000 Gls 1.00 64.00 0.00 64.00
SUB-TOTAL DE MATERIALES 5,017.00
Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 245.53 245.53 0.00 245.53
Ayudante albañil (1) 1.0000 Hr. 132.34 132.34 0.00 132.34
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 477.30
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 272.75
Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 423.73 76.27 423.73 76.27 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA 285.71
HERRAMIENTAS: 5 % M.O. 13.64
SUB-TOTAL DE EQUIPOS 299.35
costo/m3 3,557.10
costo/m2 177.85
Materiales:
cemento gris 7.5300 Fds 480.00 406.78 73.22 3,063.05 551.35 3,614.40
arena gruesa ITABO LAVADA (de PLANTA) 0.5200 m3 1,500.00 780.00 0.00 780.00
gravilla 3/4 @ 3/8" 0.7300 m3 1,500.00 1,095.00 0.00 1,095.00
agua 54.6500 Gls 1.00 54.65 0.00 54.65
SUB-TOTAL DE MATERIALES 5,544.05
Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 245.53 245.53 0.00 245.53
Ayudante albañil (1) 1.0000 Hr. 132.34 132.34 0.00 132.34
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 477.30
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 272.75
Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 423.73 76.27 423.73 76.27 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA 285.71
HERRAMIENTAS: 5 % M.O. 13.64
SUB-TOTAL DE EQUIPOS 299.35
costo/m3 6,116.15
Materiales:
cemento gris 8.3100 Fds 480.00 406.78 73.22 3,380.34 608.46 3,988.80
arena gruesa ITABO LAVADA (de PLANTA) 0.5100 m3 1,500.00 765.00 0.00 765.00
gravilla 3/4 @ 3/8" 0.7100 m3 1,500.00 1,065.00 0.00 1,065.00
agua 51.2200 Gls 1.00 51.22 0.00 51.22
SUB-TOTAL DE MATERIALES 5,870.02
Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 245.53 245.53 0.00 245.53
Ayudante albañil (1) 1.0000 Hr. 132.34 132.34 0.00 132.34
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 290.57
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 166.04
Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 423.73 76.27 423.73 76.27 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA 285.71
HERRAMIENTAS: 5 % M.O. 8.30
SUB-TOTAL DE EQUIPOS 294.02
costo/m3 6,330.08
Materiales:
cemento gris 8.9400 Fds 480.00 406.78 73.22 3,636.61 654.59 4,291.20
arena gruesa ITABO LAVADA (de PLANTA) 0.5100 m3 1,500.00 765.00 0.00 765.00
gravilla 3/4 @ 3/8" 0.7000 m3 1,500.00 1,050.00 0.00 1,050.00
agua 51.2200 Gls 1.00 51.22 0.00 51.22
SUB-TOTAL DE MATERIALES 6,157.42
Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 245.53 245.53 0.00 245.53
Ayudante albañil (1) 1.0000 Hr. 132.34 132.34 0.00 132.34
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 290.57
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 166.04
Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 423.73 76.27 423.73 76.27 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA 285.71
HERRAMIENTAS: 5 % M.O. 8.30
SUB-TOTAL DE EQUIPOS 294.02
costo/m3 6,617.48
bloques de 0.15 mts (6") TAVARES INDUSTRI 13.0000 Ud 44.00 37.29 6.71 484.75 87.25 572.00
acero 3/8" x 20' -G40 0.1184 QQ 3,800.00 3,220.34 579.66 381.27 68.63 449.90
alambre dulce #18 0.1590 Lbs 100.00 84.74 15.25 13.47 2.43 15.90
mezcla 1:3 0.0250 m3 6,993.84 5,926.98 1,066.86 148.17 26.67 174.85
Hormigón 140 Kg/cms2 (1:3:5) 0.0367 m3 6,116.15 5,183.18 932.97 190.05 34.21 224.26
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.40 mts 13.0000 Ud 2.10 27.33 0.00 27.33
Herramientas (2%) 0.0200 P.A. 1,037.80 879.49 158.31 17.59 3.17 20.76
COSTO/MT² 1,670.39 222.36 1,892.75
madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 187.07 187.07 0.00 187.07
andamios 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/MT² 386.59 35.91 422.50
Cantos
madera pino americano cepillada 0.8300 P2 125.00 105.93 19.07 87.92 15.83 103.75
mezcla 1:1.5:5 (pañete) 0.0050 m3 3,457.52 2,930.10 527.42 14.65 2.64 17.29
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 121.04 102.57 18.46 2.05 0.37 2.42
COSTO/ML 186.96 18.83 205.79
mezcla 1:3
cemento gris 11.5100 Fds 480.00 406.78 73.22 4,682.03 842.77 5,524.80
arena gruesa ITABO (de mina) 1.0000 m3 1,200.00 1,200.00 0.00 1,200.00
agua 69.0400 Gls 1.00 69.04 0.00 69.04
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 6,362.95 842.77 7,205.72
mezcla 1:3-A
cemento gris 11.5100 Fds 480.00 406.78 73.22 4,682.03 842.77 5,524.80
arena gruesa ITABO LAVADA (de PLANTA) 1.0000 m3 1,200.00 1,200.00 0.00 1,200.00
agua 69.0400 Gls 1.00 69.04 0.00 69.04
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 6,362.95 842.77 7,205.72
mezcla 1:4
cemento gris 9.5000 Fds 480.00 406.78 73.22 3,864.41 695.59 4,560.00
arena gruesa ITABO (de mina) 1.0600 m3 1,200.00 1,272.00 0.00 1,272.00
agua 68.1600 Gls 1.00 68.16 0.00 68.16
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 5,616.44 695.59 6,312.04
mezcla 1:6
cemento gris 6.4600 Fds 480.00 406.78 73.22 2,627.80 473.00 3,100.80
arena gruesa ITABO (de mina) 1.1200 m3 1,200.00 1,344.00 0.00 1,344.00
agua 67.7200 Gls 1.00 67.72 0.00 67.72
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 4,451.39 473.00 4,924.40
mezcla 1:10
cemento gris 6.4500 Fds 480.00 406.78 73.22 2,623.73 472.27 3,096.00
arena gruesa ITABO (de mina) 1.1500 m3 1,200.00 1,380.00 0.00 1,380.00
agua 40.0000 Gls 1.00 40.00 0.00 40.00
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 4,455.60 472.27 4,927.88
cemento gris 9.4600 Fds 480.00 406.78 73.22 3,848.14 692.66 4,540.80
arena FINA (para pañete) 0.9100 m3 1,200.00 1,092.00 0.00 1,092.00
cal (50 LBS) 6.2900 Fds 260.00 220.34 39.66 1,385.93 249.47 1,635.40
agua 45.2400 Gls 1.00 45.24 0.00 45.24
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 2,935.05 249.47 3,184.52
cemento gris 9.4600 Fds 480.00 406.78 73.22 3,848.14 692.66 4,540.80
Arena lavada 0.9100 m3 1,500.00 1,365.00 0.00 1,365.00
cal (50 LBS) 6.2900 Fds 260.00 220.34 39.66 1,385.93 249.47 1,635.40
agua 45.2400 Gls 1.00 45.24 0.00 45.24
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 3,208.05 249.47 3,457.52
cemento gris 11.9700 Fds 480.00 406.78 73.22 4,869.15 876.45 5,745.60
arena FINA (para pañete) 0.8700 m3 1,500.00 1,305.00 0.00 1,305.00
cal (50 LBS) 6.0000 Fds 260.00 220.34 39.66 1,322.03 237.97 1,560.00
agua 43.1200 Gls 1.00 43.12 0.00 43.12
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 3,082.03 237.97 3,320.00
cemento gris 40.6100 FDS 480.00 406.78 73.22 16,519.32 2,973.48 19,492.80
agua 121.5200 GLS 1.00 121.52 0.00 121.52
COSTO/Mt³ 16,640.84 2,973.48 19,614.32
mezcla 1:2
cemento gris 15.5700 Fds 480.00 406.78 73.22 6,333.56 1,140.04 7,473.60
arena gruesa ITABO (de mina) 0.9000 m3 1,200.00 1,080.00 0.00 1,080.00
agua 70.1000 Gls 1.00 70.10 0.00 70.10
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 7,895.53 1,140.04 9,035.58
Andamios Interiores
Madera Pino Americano Bruta 0.1820 P2 125.00 105.93 19.07 19.28 3.47 22.75
Colocación Andamio Interior 0.02 dia 1,964.25 39.29 0.00 39.29
Clavo corriente 0.010 LBS 60.00 50.85 9.15 0.51 0.09 0.60
Herramientas (2%) 0.0200 P.A. 22.75 19.28 3.47 0.39 0.07 0.46
COSTO/MT² 59.46 3.63 63.09
Acero de 3/8" grado 60 1.12 QQ 3,800.00 3,220.34 579.66 3,606.78 649.22 4,256.00
Desp Acero (5% desp.) 0.056 QQ RD$ 4,256.00 3,606.78 649.22 201.98 36.36 238.34
M.O. acero 16.6666666666667 M RD$ 136.01 115.26 20.75 1,921.06 345.79 2,266.86
Alambre #18 (2lb/qq) 2.24 LB RD$ 100.00 84.74 15.25 189.82 34.17 223.99
Carpintería (todo costo) 16.6666666666667 M 0.00 0.00 0.00 0.00 0.00
Horm. 210 Kg/Cm² 1 M3 0.00 0.00 0.00 0.00 0.00
Desp 'Horm. 210 Kg/Cm²+10% 0.05 M3 0.00 0.00 0.00 0.00 0.00
COSTO/Mt³ 5,919.65 1,065.54 6,985.18
I REHABILITACION
1 PRELIMINARES
Arte e impresión en vilnil y colocación 1.0000 PA 26,500.00 22,457.62 4,042.37 22,457.62 4,042.37 26,500.00
Estructura metálica todo costo 1.0000 PA 30,000.00 25,423.73 4,576.27 25,423.73 4,576.27 30,000.00
COSTO/UD 47,881.35 8,618.64 56,500.00
Plywood 3/4 ( 2 usos) 84.0000 m2 674.63 571.72 102.91 48,024.31 8,644.38 56,668.69
Clavos de Zinc 18.0000 LBS 120.00 101.69 18.31 1,830.51 329.49 2,160.00
Madera Pino Americano Bruta (4 usos) 28.0000 P2 125.00 105.93 19.07 2,966.10 533.90 3,500.00
Zinc Calibre 34 (3 x 6) 2 usos 32.0000 PLANCHA 355.10 300.93 54.17 9,629.83 1,733.37 11,363.20
Puerta (0.90 x 2.10 mts.) y Marco 1.0000 UD 5,462.96 4,629.63 833.33 4,629.63 833.33 5,462.96
Albañil de Segunda Categoria 3.0000 Día 1,568.75 4,706.25 0.00 4,706.25
Carpintero de Segunda Categoria 3.0000 Día 1,568.75 4,706.25 0.00 4,706.25
Trabajador No calificado (TNC) 3.0000 Día 823.75 2,471.25 0.00 2,471.25
Herramientas (2%) 0.0200 P.A. 79,154.85 67,080.38 12,074.47 1,341.61 241.49 1,583.10
COSTO/UD 32,281.43 3,671.58 35,953.01
COSTO/M2 658.80 74.93 733.73
Traslado De Butacas, Sillas Y Mesas 1.0000 aula 1,350.00 1,350.00 0.00 1,350.00
COSTO/UD 1,350.00 0.00 1,350.00
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0400 m3 6,993.84 5,926.98 1,066.86 237.08 42.67 279.75
fino en techo horiz. sin incl. subida de mater 1.0000 m2 164.22 164.22 0.00 164.22
Herramientas (2%) 0.0200 P.A. 281.38 238.46 42.92 4.77 0.86 5.63
COSTO/MT² 407.44 43.78 451.22
Prime + 10% 0.0500 GL/MT² 1,375.00 1,165.25 209.75 58.26 10.49 68.75
Manto asfartico e= 4mm+10% 1.1000 MT² 501.87 425.31 76.56 467.84 84.21 552.06
Pintura de aluminio 0.0500 GL/MT² 1,100.00 932.20 167.80 46.61 8.39 55.00
Aplicación impermeabilizante 1.0000 MT² 26.71 26.71 0.00 26.71
COSTO/MT² 599.43 103.09 702.52
niple niquelado 3/8" x 2½" 1.0000 UD 45.00 38.14 6.86 38.14 6.86 45.00
reducción bushing de ½" A 3/8" HG. 1.0000 UD 29.66 25.14 4.52 25.14 4.52 29.66
arandela sanitaria PVC de 3 ó 4" 1.0000 UD 99.04 83.93 15.11 83.93 15.11 99.04
cubrefalta niquelado de 3/8" 1.0000 UD 18.00 15.25 2.75 15.25 2.75 18.00
junta de CERA 1.0000 UD 99.59 84.40 15.19 84.40 15.19 99.59
llave ANGULAR de 3/8" 1.0000 UD 244.86 207.51 37.35 207.51 37.35 244.86
tubo flexible plástico 1.0000 UD 127.57 108.11 19.46 108.11 19.46 127.57
tornillos para inodoros 2.0000 UD 42.83 36.30 6.53 72.59 13.07 85.66
Tubo de Silicon industrial trasnp. 10.3 0.3000 UD 450.00 381.36 68.64 114.41 20.59 135.00
Teflon 3/4'' 0.5000 UD 22.94 19.44 3.50 9.72 1.75 11.47
montura inodoros de una pieza 1.0000 UD 2,890.36 2,890.36 0.00 2,890.36
COSTO/UD 3,649.55 136.66 3,786.21
2.302 S/C Accesorios Lavamanos (Sifon, Cola, Llave, Mano De Obra)
niple niquelado 3/8" x 2½" 2.0000 UD 45.00 38.14 6.86 76.27 13.73 90.00
reducción bushing de ½" A 3/8" HG. 2.0000 UD 29.66 25.14 4.52 50.27 9.05 59.32
sifón drenaje 1½" 1.0000 UD 192.29 162.96 29.33 162.96 29.33 192.29
boquilla para lavamanos 1.0000 UD 700.00 593.22 106.78 593.22 106.78 700.00
cubrefalta niquelado de 3/8" 2.0000 UD 18.00 15.25 2.75 30.51 5.49 36.00
llave ANGULAR de 3/8" 2.0000 UD 244.86 207.51 37.35 415.02 74.70 489.72
tubo flexible plástico 2.0000 UD 127.57 108.11 19.46 216.22 38.92 255.14
mezcladora 1.0000 UD 1,963.25 1,663.77 299.48 1,663.77 299.48 1,963.25
tarugos plásticoS 3/8" 4.0000 UD 15.00 12.71 2.29 50.85 9.15 60.00
tornillo 3" x 14 4.0000 UD 42.83 36.30 6.53 145.19 26.13 171.32
montura de accesorios de lavamano 1.0000 UD 300.00 300.00 0.00 300.00
COSTO/UD 3,704.27 612.77 4,317.04
Orinal pequeño con accesorios 1.0000 ud. 4,773.70 4,045.51 728.19 4,045.51 728.19 4,773.70
Válvula para orinales 1.0000 ud. 192.29 162.96 29.33 162.96 29.33 192.29
Sifon de 11/2 pvc. 1.0000 ud. 192.29 162.96 29.33 162.96 29.33 192.29
Llave angular de 3/8'' 1.0000 ud. 244.86 207.51 37.35 207.51 37.35 244.86
Niple 3/8" x 2 1/2", cromado 1.0000 ud. 45.00 38.14 6.86 38.14 6.86 45.00
Cubrefalta 3/8'' cromado 1.0000 ud. 18.00 15.25 2.75 15.25 2.75 18.00
tubo flexible plástico 1.0000 ud. 127.57 108.11 19.46 108.11 19.46 127.57
Teflón 1.0000 rollo 22.94 19.44 3.50 19.44 3.50 22.94
Mano de Obra 1.0000 ud 2,190.00 2,190.00 0.00 2,190.00
COSTO/UD 6,949.87 856.78 7,806.65
sifón drenaje 2" 1.0000 UD 192.29 162.96 29.33 162.96 29.33 192.29
rejilla roscada de 2" HG para piso 1.0000 UD 70.00 59.32 10.68 59.32 10.68 70.00
desague de piso de 2 pulgadas (Incl. Parrilla 1.0000 Ud 1,122.30 1,122.30 0.00 1,122.30
COSTO/UD 1,344.58 40.01 1,384.59
250
2.6 PINTURA
pintura mantenimiento 0.0800 GLS 1,130.00 957.63 172.37 76.61 13.79 90.40
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 175.40 148.64 26.76 2.97 0.54 3.51
COSTO/MT² 220.42 25.77 246.19
pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38
pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38
Suministro pintura esmalte 0.0400 GLN 1,130.00 957.63 172.37 38.31 6.89 45.20
Thinner 0.0500 GLN 416.67 353.11 63.56 17.66 3.18 20.83
M.O aplicación dos manos a pistola 1.0000 MT² 75.00 75.00 0.00 75.00
Desperdicios y retoques. 0.2000 66.03 55.96 10.07 11.19 2.01 13.21
COSTO/MT² 142.15 12.09 154.24
Suministro pintura esmalte 0.0400 GLN 1,130.00 957.63 172.37 38.31 6.89 45.20
Thinner 0.0500 GLN 416.67 353.11 63.56 17.66 3.18 20.83
M.O aplicación dos manos a pistola 1.0000 MT² 75.00 75.00 0.00 75.00
Desperdicios y retoques. 0.2000 66.03 55.96 10.07 11.19 2.01 13.21
COSTO/MT² 142.15 12.09 154.24
Caja rectangular de 1/2" 1.0000 UD 120.43 102.06 18.37 102.06 18.37 120.43
EMT de 1/2" X 10' 1.5000 UD 170.95 144.87 26.08 217.31 39.12 256.43
Curva EMT de 1/2" 2.0000 PL 44.33 37.57 6.76 75.14 13.52 88.66
Coupling EMT de 1/2" 3.0000 UD 9.36 7.93 1.43 23.80 4.28 28.08
Conector recto EMT de 1/2" 2.0000 UD 158.92 134.68 24.24 269.36 48.48 317.84
Alambre THW #12 45.0000 PL 14.12 11.97 2.15 538.47 96.93 635.40
Tape 3M SCOTT +33 0.0500 ROLL 416.67 353.11 63.56 17.66 3.18 20.83
Abrazadera EMT de 1/2" 4.0000 UD 2.98 2.53 0.45 10.10 1.82 11.92
Tarugo azul c/tornillo 8.0000 UD 15.00 12.71 2.29 101.69 18.31 120.00
Mano de obra 1.0000 PA 885.94 885.94 0.00 885.94
COSTO/UD 2,241.52 244.00 2,485.53
Caja Octagonal americana 1/2" ó 3/4" 1.0000 UD 120.43 102.06 18.37 102.06 18.37 120.43
Tuberia de 1/2" PVC SDR-26 20.0000 PL 113.89 96.52 17.37 1,930.34 347.46 2,277.80
Alambre THHN # 12 42.0000 PL 14.12 11.97 2.15 502.58 90.46 593.04
Conectores PVC de 1/2" 2.0000 UD 12.00 10.17 1.83 20.34 3.66 24.00
Tuercas conduit de 1/2" 2.0000 UD 1.12 0.95 0.17 1.90 0.34 2.24
Mensajero electrico (soga, nylon) 21.0000 PL 1.38 1.17 0.21 24.56 4.42 28.98
Materiales menores (tornillos, etc) 1.0000 P.A. 15.50 13.14 2.36 13.14 2.36 15.50
Cemento PVC 0.0130 PINTA 205.03 173.75 31.28 2.26 0.41 2.67
Cinta adhesiva 3m (rollo) 0.0500 UD 416.67 353.11 63.56 17.66 3.18 20.83
Mano de obra cenital 1.0000 P.A. 885.94 885.94 0.00 885.94
Suministro de Lampara Tipo Cobra 150W 1.0000 UD 3,500.00 2,966.10 533.90 2,966.10 533.90 3,500.00
M.O. Colocacion lampara Tipo Cobra 150W 1.0000 UD 500.00 500.00 0.00 500.00
COSTO/UD 6,966.86 1,004.57 7,971.43
A/A Aire Acondicionado De 24BT 1.0000 Und 52,000.00 44,067.80 7,932.20 44,067.80 7,932.20 52,000.00
mano de obra instalac ion A/A De 24BT 0.2000 Und 52,000.00 10,400.00 0.00 10,400.00
COSTO/UD 54,467.80 7,932.20 62,400.00
Abanico KDK (Techo) 56" 1.0000 UD 4,600.00 3,898.31 701.69 3,898.31 701.69 4,600.00
accesorios electricos 0.1000 % 4,600.00 3,898.31 701.69 389.83 70.17 460.00
Mano obra instalacion Abanico KDK (Techo) 1.0000 UD 1,200.00 1,200.00 0.00 1,200.00
COSTO/UD 5,488.14 771.86 6,260.00
Abanico KDK (Techo) 56" 1.0000 UD 4,600.00 3,898.31 701.69 3,898.31 701.69 4,600.00
accesorios electricos 0.1000 % 4,600.00 3,898.31 701.69 389.83 70.17 460.00
Mano obra instalacion Abanico KDK (Techo) 1.0000 UD 1,200.00 1,200.00 0.00 1,200.00
COSTO/UD 5,488.14 771.86 6,260.00
A/A Aire Acondicionado De 12BTU 1.0000 Und 28,500.00 24,152.54 4,347.46 24,152.54 4,347.46 28,500.00
mano de obra instalac ion A/A De 12BTU 0.2000 Und 28,500.00 5,700.00 0.00 5,700.00
COSTO/UD 29,852.54 4,347.46 34,200.00
Suministro condulex de 2" 1.0000 PL 606.48 513.97 92.51 513.97 92.51 606.48
Colocacion condulex de 2" 0.3500 PL 606.48 212.27 0.00 212.27
COSTO/PL 726.24 92.51 818.75
3.1 PISOS
A/A Aire Acondicionado De 24BT 1.0000 Und 52,000.00 44,067.80 7,932.20 44,067.80 7,932.20 52,000.00
mano de obra instalac ion A/A De 24BT 0.2000 Und 52,000.00 10,400.00 0.00 10,400.00
COSTO/UD 54,467.80 7,932.20 62,400.00
4 AREA EXTERIOR
pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38
Suministro pintura esmalte 0.0400 GLN 1,130.00 957.63 172.37 38.31 6.89 45.20
Thinner 0.0500 GLN 416.67 353.11 63.56 17.66 3.18 20.83
M.O aplicación dos manos a pistola 1.0000 MT² 75.00 75.00 0.00 75.00
Desperdicios y retoques. 0.2000 141.03 119.52 21.51 23.90 4.30 28.21
COSTO/MT² 154.86 14.38 169.24
4.2 CANALETAS
Malla electrosoldada 2.7 x 2.7 10 x 10 0.1100 QQ 15,500.00 13,135.59 2,364.41 1,444.92 260.08 1,705.00
Hormigon 180 kg/m2 industial 1.0500 M3 6,852.58 5,807.27 1,045.31 6,097.64 1,097.57 7,195.21
Madera a todo costo (GUARDERAS) 4.0000 ML 225.00 190.68 34.32 762.71 137.29 900.00
Mano obra malla 0.1100 M2 48.14 5.30 0.00 5.30
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 8,564.80 1,494.95 10,059.75
COSTO/MT² 77,861.83 13,590.43 91,452.26
4.4 MISCELANEOS
Letras en Bronce de 8" 1.0000 UD 1,946.27 1,649.38 296.89 1,649.38 296.89 1,946.27
Colocacion de letras en Sintra de 8" 0.4000 % 1,946.27 778.51 0.00 778.51
COSTO/UD 2,427.89 296.89 2,724.78
Figura de bronce en baño 1.0000 UD 1,073.42 909.68 163.74 909.68 163.74 1,073.42
Figura de bronce en baño 0.4000 % 1,073.42 429.37 0.00 429.37
COSTO/UD 1,339.04 163.74 1,502.78
I.1 PRELIMINARES
1.201 Replanteo
Cal (50 LBS) 5.0000 FDA 260.00 220.34 39.66 1,101.69 198.31 1,300.00
Clavos Corrientes 20.0000 LBS 60.00 50.85 9.15 1,016.95 183.05 1,200.00
Madera Pino Americano Bruta (3 usos) 66.6667 P2 125.00 105.93 19.07 7,062.15 1,271.19 8,333.33
Clavos Acero 5.0000 LBS 55.10 46.69 8.41 233.47 42.03 275.50
Hilo de nylon 5.0000 LBS 168.30 142.63 25.67 713.14 128.36 841.50
Herramienta de Trabajo a mano 1.0000 PA 1,500.00 1,271.19 228.81 1,271.19 228.81 1,500.00
Maestro de Carpinteria 3.0000 Día 2,471.25 7,413.75 0.00 7,413.75
Maestro de Albañileria 3.0000 Día 2,471.25 7,413.75 0.00 7,413.75
Brigada Reducida Topografia 10.0000 Día 3,500.00 35,000.00 0.00 35,000.00
Estacion total 1.0000 Día 10,000.00 10,000.00 0.00 10,000.00
Carpintero de Segunda Categoria 3.0000 Día 1,568.75 4,706.25 0.00 4,706.25
Trabajador No calificado (TNC) 3.0000 Día 823.75 2,471.25 0.00 2,471.25
COSTO/UD 78,403.59 2,051.75 80,455.33
COSTO/m2 273.16 7.15 4,469.74
EXTRACCION CON D7G 1.0000 COSTO/M3N = 44.15 37.42 6.74 37.42 6.74 44.15
REND =95.00 M3/H
CARGIO 950 CAT 1.0000 COSTO/M3E = 33.81 28.65 5.16 28.65 5.16 33.81
REND = 95.00 M3/H
EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos
MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32
Alq. Compactador maquito 1.00 M3 10.42 8.83 1.59 8.83 1.59 10.42
Peones ( 3 ) 3.0000 Hr 102.97 308.91 0.00 308.91
Combustible (3 Galones/día) 0.3800 Gls 221.60 187.80 33.80 71.36 12.85 84.21
Lubricante 0.1500 Gls 84.21 71.36 12.85 10.70 1.93 12.63
SUB-TOTAL 416.16
Rendimiento 3.0000 Mt³/Hr 416.16 138.72 138.72
Material granular 1.5000 Mt³ 650.00 975.00 0.00 975.00
Regado y mojado 1.0000 Mt³ 175.00 175.00 175.00
Herramienta 0.0200 % 1,113.72 943.83 169.89 18.88 3.40 22.27
COSTO/MT³ 1,307.60 3.40 1,311.00
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
Acero Ø1/2´´ de 20! 2.7810 QQ 3,800.00 3,220.34 579.66 8,955.76 1,612.04 10,567.80
Acero Ø 3/8 ´´ de 20! 1.5680 QQ 3,800.00 3,220.34 579.66 5,049.49 908.91 5,958.40
Alambre No.18 8.6980 LBS 100.00 84.74 15.25 737.09 132.68 869.76
Hormigón Industrial 210 kg /cm2 +5% 1.0200 MT³ 7,205.15 6,106.06 1,099.09 6,228.18 1,121.07 7,349.25
M.O acero 4.3490 QQ 401.30 1,745.25 0.00 1,745.25
Encofrado 25.0000 ML 600.00 15,000.00 0.00 15,000.00
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 37,970.01 3,774.69 41,744.71
Acero Ø 3/8´´ de 20! 2.1430 QQ 3,800.00 3,220.34 579.66 6,901.19 1,242.21 8,143.40
Alambre No.18 4.2860 LBS 100.00 84.74 15.25 363.20 65.38 428.58
Hormigón Industrial 210 kg /cm2 +5% 1.0200 MT³ 7,205.15 6,106.06 1,099.09 6,228.18 1,121.07 7,349.25
M.O acero 2.1430 QQ 401.30 859.99 0.00 859.99
Personal por la casa 1.0500 242.13 254.24 0.00 254.24
COSTO/MT³ 14,606.79 2,428.66 17,035.46
Acero Ø 3/8´´ de 20! 2.1430 QQ 3,800.00 3,220.34 579.66 6,901.19 1,242.21 8,143.40
Alambre No.18 4.2860 LBS 100.00 84.74 15.25 363.20 65.38 428.58
Hormigón Industrial 210 kg /cm2 +5% 1.0200 MT³ 7,205.15 6,106.06 1,099.09 6,228.18 1,121.07 7,349.25
M.O acero 2.1430 QQ 401.30 859.99 0.00 859.99
Encofrado 33.3330 ML 250.00 8,333.25 0.00 8,333.25
Personal por la casa 1.0500 242.13 254.24 0.00 254.24
COSTO/MT³ 22,940.04 2,428.66 25,368.71
Acero Ø 3/8´´ de 20! 1.2034 QQ 3,800.00 3,220.34 579.66 3,875.38 697.57 4,572.95
Alambre No.18 2.4068 LBS 100.00 84.74 15.25 203.96 36.71 240.67
Hormigón Industrial 210 kg /cm2 +5% 1.0200 MT³ 7,205.15 6,106.06 1,099.09 6,228.18 1,121.07 7,349.25
M.O acero 1.2034 QQ 401.30 482.93 0.00 482.93
Encofrado 33.3330 ML 250.00 8,333.25 0.00 8,333.25
Personal por la casa 1.0500 242.13 254.24 0.00 254.24
COSTO/MT³ 19,377.94 1,855.35 21,233.29
bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 3/8" x 20' -G40 0.0320 QQ 3,800.00 3,220.34 579.66 103.05 18.55 121.60
alambre dulce #18 0.0640 Lbs 100.00 84.74 15.25 5.42 0.98 6.40
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 KG/cms2 (1:3:5) 0.0240 m3 6,116.15 5,183.18 932.97 124.40 22.39 146.79
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 20.52 0.00 20.52
Herramientas (2%) 0.0200 P.A. 694.50 588.56 105.94 11.77 2.12 13.89
COSTO/M2 1,263.86 161.39 1,425.25
Bloques horm. + 4% desp. + itbis 13.0000 u 44.00 37.29 6.71 484.75 87.25 572.00
Mortero 1:3 en juntas + 30% desp. 0.0312 m3 6,993.84 5,926.98 1,066.86 184.92 33.29 218.21
Horm. en cámaras + 10% desp. 0.0200 m3 6,116.15 5,183.18 932.97 103.66 18.66 122.32
Acero 3/8" x 20' grado 40 + 20% desp. 0.0592 qq 3,800.00 3,220.34 579.66 190.64 34.32 224.96
Alambre No. 18 0.0888 LBS 100.00 84.74 15.25 7.53 1.35 8.88
Corte y amarre varilla. 13.0000 u 1.58 20.52 0.00 20.52
Llenado huecos. 13.0000 u 3.15 40.90 0.00 40.90
Coloc. bloques. 13.0000 u 23.53 305.83 0.00 305.83
Andamio 1.0000 M2 63.09 63.09 0.00 63.09
COSTO/MT² 1,401.84 174.87 1,576.71
derretido cemento blanco (100 LBS) 0.0333 FDS 795.03 673.76 121.28 22.44 4.04 26.47
cerámica 20 x 20 Area de lavado 1.1000 M2 738.83 626.12 112.70 688.74 123.97 812.71
ESTOPA 0.0500 LBS 125.00 105.93 19.07 5.30 0.95 6.25
Pegamento Especial para Ceramica 0.1667 fda 522.00 442.37 79.63 73.73 13.27 87.00
colocación en paredes de losetas cerámica 1.0000 M2 575.71 575.71 0.00 575.71
corte de losetas de cerámica 4.5000 UD 5.00 22.50 0.00 22.50
Herramientas (2%) 0.0300 P.A. 932.43 790.20 142.24 23.71 4.27 27.97
COSTO/MT² 1,412.11 146.50 1,558.62
madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. 1.0000 M2 187.07 187.07 0.00 187.07
nivel
andamios 1.0000 M2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/MT² 352.98 29.86 382.85
madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 242.13 242.13 0.00 242.13
andamios 1.0000 M2 34.68 29.39 5.29 29.39 5.29 34.68
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/MT² 417.56 31.58 449.14
Mortero 1:4 de empañete. 0.0150 M3 5,912.96 5,010.98 901.98 75.16 13.53 88.69
Regla madera americana cepillada 1"x4" / 2 0.0250 P2 111.11 94.16 16.95 2.35 0.42 2.78
Andamios en madera 1.0000 M2 34.68 29.39 5.29 29.39 5.29 34.68
Mano de obra empañete techos y vigas 1.0000 M2 242.13 242.13 0.00 242.13
COSTO/MT² 349.03 19.24 368.27
mezcla 1:1.5:5 (pañete) 0.0003 m3 7,513.44 6,367.32 1,146.12 1.91 0.34 2.25
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
goteros en ranuras 1.0000 ml 164.67 139.55 25.12 139.55 25.12 164.67
Herramientas (2%) 0.0200 P.A. 2.25 1.91 0.34 0.04 0.01 0.05
COSTO/ML 161.36 29.04 190.40
madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0350 m3 6,993.84 5,926.98 1,066.86 207.44 37.34 244.78
fino en techo horiz. sin incl. subida de mater 1.0000 m2 131.38 131.38 0.00 131.38
Herramientas (2%) 0.0200 P.A. 246.41 208.82 37.59 4.18 0.75 4.93
COSTO/MT2 344.37 38.34 382.71
Prime + 10% 0.0500 GL/MT² 1,375.00 1,165.25 209.75 58.26 10.49 68.75
Manto asfartico e= 4mm+10% 1.1000 MT² 501.87 425.31 76.56 467.84 84.21 552.06
Pintura de aluminio 0.0500 GL/MT² 1,100.00 932.20 167.80 46.61 8.39 55.00
Aplicación impermeabilizante 1.0000 MT² 70.91 70.91 0.00 70.91
COSTO/MT² 643.63 103.09 746.72
niple niquelado 3/8" x 2½" 1.0000 UD 45.00 38.14 6.86 38.14 6.86 45.00
reducción bushing de ½" A 3/8" HG. 1.0000 UD 29.66 25.14 4.52 25.14 4.52 29.66
arandela sanitaria PVC de 3 ó 4" 1.0000 UD 99.04 83.93 15.11 83.93 15.11 99.04
cubrefalta niquelado de 3/8" 1.0000 UD 18.00 15.25 2.75 15.25 2.75 18.00
junta de CERA 1.0000 UD 99.59 84.40 15.19 84.40 15.19 99.59
llave ANGULAR de 3/8" 1.0000 UD 244.86 207.51 37.35 207.51 37.35 244.86
tubo flexible plástico 1.0000 UD 127.57 108.11 19.46 108.11 19.46 127.57
tornillos para inodoros 2.0000 UD 42.83 36.30 6.53 72.59 13.07 85.66
Tubo de Silicon industrial trasnp. 10.3 0.3000 UD 450.00 381.36 68.64 114.41 20.59 135.00
Teflon 3/4'' 0.5000 UD 22.94 19.44 3.50 9.72 1.75 11.47
montura inodoros de una pieza 1.0000 UD 2,890.36 2,890.36 0.00 2,890.36
COSTO/UD 3,649.55 136.66 3,786.21
Meseta de granito con palometa incluida 1.0000 p² 525.00 444.92 80.08 444.92 80.08 525.00
Derretido Cemento Gris (100 LBS) 0.0250 FDS 480.00 406.78 73.22 10.17 1.83 12.00
Mezcla 1:4 0.0320 Mt³ 5,912.96 5,010.98 901.98 160.35 28.86 189.21
Colocacion de meseta 0.3000 % 537.00 161.10 0.00 161.10
COSTO/P² 776.54 110.78 887.31
niple niquelado 3/8" x 2½" 2.0000 UD 45.00 38.14 6.86 76.27 13.73 90.00
reducción bushing de ½" A 3/8" HG. 2.0000 UD 29.66 25.14 4.52 50.27 9.05 59.32
sifón drenaje 1½" 1.0000 UD 192.29 162.96 29.33 162.96 29.33 192.29
boquilla para lavamanos 1.0000 UD 700.00 593.22 106.78 593.22 106.78 700.00
cubrefalta niquelado de 3/8" 2.0000 UD 18.00 15.25 2.75 30.51 5.49 36.00
llave ANGULAR de 3/8" 2.0000 UD 244.86 207.51 37.35 415.02 74.70 489.72
tubo flexible plástico 2.0000 UD 127.57 108.11 19.46 216.22 38.92 255.14
mezcladora 1.0000 UD 1,963.25 1,663.77 299.48 1,663.77 299.48 1,963.25
tarugos plásticoS 3/8" 4.0000 UD 15.00 12.71 2.29 50.85 9.15 60.00
tornillo 3" x 14 4.0000 UD 42.83 36.30 6.53 145.19 26.13 171.32
Lavamanos ovalado 1.0000 UD 2,203.42 1,867.31 336.11 1,867.31 336.11 2,203.42
Instalación lavamanos empotrados en mese 1.0000 UD 2,247.21 2,247.21 0.00 2,247.21
COSTO/UD 7,518.79 948.88 8,467.67
Orinal pequeño con accesorios 1.0000 ud. 4,773.70 4,045.51 728.19 4,045.51 728.19 4,773.70
Válvula para orinales 1.0000 ud. 192.29 162.96 29.33 162.96 29.33 192.29
Sifon de 11/2 pvc. 1.0000 ud. 192.29 162.96 29.33 162.96 29.33 192.29
Llave angular de 3/8'' 1.0000 ud. 244.86 207.51 37.35 207.51 37.35 244.86
Niple 3/8" x 2 1/2", cromado 1.0000 ud. 45.00 38.14 6.86 38.14 6.86 45.00
Cubrefalta 3/8'' cromado 1.0000 ud. 18.00 15.25 2.75 15.25 2.75 18.00
tubo flexible plástico 1.0000 ud. 127.57 108.11 19.46 108.11 19.46 127.57
Teflón 1.0000 rollo 22.94 19.44 3.50 19.44 3.50 22.94
Mano de Obra 1.0000 ud 2,190.00 2,190.00 0.00 2,190.00
COSTO/UD 6,949.87 856.78 7,806.65
Tubo 4"x19 PVC SDR-41 1.0000 UND 1,565.38 1,326.59 238.79 1,326.59 238.79 1,565.38
Codo PVC drenaje 4" x 90° 1.0000 UND 129.29 109.57 19.72 109.57 19.72 129.29
Tee PVC drenaje 4" 1.0000 UND 253.97 215.23 38.74 215.23 38.74 253.97
Cemento PVC 0.0100 UND 1,799.00 1,524.58 274.42 15.25 2.74 17.99
Tarugo azul con tornillo 6.0000 UND 15.00 12.71 2.29 76.27 13.73 90.00
Abrazadera 3" EMT 3.0000 UND 52.20 44.24 7.96 132.71 23.89 156.60
Mano de Obra 1.00 UND 1,445.20 1,445.20 0.00 1,445.20
COSTO/UD 3,320.82 337.61 3,658.43
Tubo 3"x19 PVC 3.5000 UND 630.77 534.55 96.22 1,870.93 336.77 2,207.70
Cemento PVC OATEY 32oz 0.0180 UND 1,799.00 1,524.58 274.42 27.44 4.94 32.38
Herramientas 0.0500 % 2,240.08 1,898.37 341.71 94.92 17.09 112.00
Excavación en tiera a mano 7.0000 M3 458.30 388.39 69.91 2,718.76 489.38 3,208.13
Relleno de reposición 2.3647 M3 163.34 138.42 24.92 327.33 58.92 386.24
Bote de material producto de excavación 5.0353 M3 1,288.31 1,091.79 196.52 5,497.52 989.55 6,487.07
Mano de Obra 20.0000 ML 33.86 677.20 0.00 677.20
COSTO/UD 11,214.09 1,896.64 13,110.73
COSTO/ML 560.70 94.83 655.54
Tubo 2"x19 PVC 3.5000 UND 400.71 339.58 61.13 1,188.54 213.94 1,402.48
Cemento PVC OATEY 32oz 0.0180 UND 1,799.00 1,524.58 274.42 27.44 4.94 32.38
Herramientas 0.0500 % 1,434.86 1,215.99 218.88 60.80 10.94 71.74
Excavación en tiera a mano 7.0000 M3 458.30 388.39 69.91 2,718.76 489.38 3,208.13
Relleno de reposición 2.3647 M3 163.34 138.42 24.92 327.33 58.92 386.24
Bote de material producto de excavación 5.0353 M3 1,288.31 1,091.79 196.52 5,497.52 989.55 6,487.07
Mano de Obra 20.0000 ML 23.76 475.20 0.00 475.20
COSTO/UD 10,295.59 1,767.67 12,063.26
COSTO/ML 514.78 88.38 603.16
Tubo 1/2"x19 PVC 3.5000 UND 525.00 444.92 80.08 1,557.20 280.30 1,837.50
Cemento PVC OATEY 32oz 0.0180 UND 1,799.00 1,524.58 274.42 27.44 4.94 32.38
Herramientas 0.0500 % 1,869.88 1,584.65 285.24 79.23 14.26 93.49
Excavación en tiera a mano 7.0000 M3 458.30 388.39 69.91 2,718.76 489.38 3,208.13
Relleno de reposición 2.3647 M3 163.34 138.42 24.92 327.33 58.92 386.24
Bote de material producto de excavación 5.0353 M3 1,288.31 1,091.79 196.52 5,497.52 989.55 6,487.07
Mano de Obra 20.0000 ML 9.50 190.00 0.00 190.00
COSTO/UD 10,397.48 1,837.35 12,234.82
COSTO/ML 519.87 91.87 611.74
Tubo 1/2"x19 PVC 3.5000 UND 525.00 444.92 80.08 1,557.20 280.30 1,837.50
Cemento PVC OATEY 32oz 0.0180 UND 1,799.00 1,524.58 274.42 27.44 4.94 32.38
Herramientas 0.0500 % 1,869.88 1,584.65 285.24 79.23 14.26 93.49
Excavación en tiera a mano 7.0000 M3 458.30 388.39 69.91 2,718.76 489.38 3,208.13
Relleno de reposición 2.3647 M3 163.34 138.42 24.92 327.33 58.92 386.24
Bote de material producto de excavación 5.0353 M3 1,288.31 1,091.79 196.52 5,497.52 989.55 6,487.07
Mano de Obra 20.0000 ML 9.50 190.00 0.00 190.00
COSTO/UD 10,397.48 1,837.35 12,234.82
COSTO/ML 519.87 91.87 611.74
Tubo 1/2"x19 PVC 3.5000 UND 525.00 444.92 80.08 1,557.20 280.30 1,837.50
Cemento PVC OATEY 32oz 0.0180 UND 1,799.00 1,524.58 274.42 27.44 4.94 32.38
Herramientas 0.0500 % 1,869.88 1,584.65 285.24 79.23 14.26 93.49
Excavación en tiera a mano 7.0000 M3 458.30 388.39 69.91 2,718.76 489.38 3,208.13
Relleno de reposición 2.3647 M3 163.34 138.42 24.92 327.33 58.92 386.24
Bote de material producto de excavación 5.0353 M3 1,288.31 1,091.79 196.52 5,497.52 989.55 6,487.07
Mano de Obra 20.0000 ML 9.50 190.00 0.00 190.00
COSTO/UD 10,397.48 1,837.35 12,234.82
COSTO/ML 519.87 91.87 611.74
Tubo 1"x19 PVC 3.5000 UND 628.96 533.02 95.94 1,865.56 335.80 2,201.36
Cemento PVC OATEY 32oz 0.0180 UND 1,799.00 1,524.58 274.42 27.44 4.94 32.38
Herramientas 0.0500 % 2,233.74 1,893.00 340.74 94.65 17.04 111.69
Excavación en tiera a mano 7.0000 M3 458.30 388.39 69.91 2,718.76 489.38 3,208.13
Relleno de reposición 2.3647 M3 163.34 138.42 24.92 327.33 58.92 386.24
Bote de material producto de excavación 5.0353 M3 1,288.31 1,091.79 196.52 5,497.52 989.55 6,487.07
Mano de Obra 20.0000 ML 19.01 380.20 0.00 380.20
COSTO/UD 10,911.45 1,895.63 12,807.08
COSTO/ML 545.57 94.78 640.35
Tubo 4"x19 PVC 3.5000 UND 1,565.38 1,326.59 238.79 4,643.08 835.75 5,478.83
Cemento PVC OATEY 32oz 0.0180 UND 1,799.00 1,524.58 274.42 27.44 4.94 32.38
Herramientas 0.0500 % 5,511.21 4,670.52 840.69 233.53 42.03 275.56
Excavación en tiera a mano 7.0000 M3 458.30 388.39 69.91 2,718.76 489.38 3,208.13
Relleno de reposición 2.3647 M3 163.34 138.42 24.92 327.33 58.92 386.24
Bote de material producto de excavación 5.0353 M3 1,288.31 1,091.79 196.52 5,497.52 989.55 6,487.07
Mano de Obra 20.0000 ML 1,445.20 28,904.00 0.00 28,904.00
COSTO/UD 42,351.64 2,420.58 44,772.22
COSTO/ML 2,117.58 121.03 2,238.61
tubo 3" PVC SDR-41 0.5000 UD 630.77 534.55 96.22 267.28 48.11 315.39
codo PVC drenaje 3" x 90° 1.0000 UD 45.24 38.34 6.90 38.34 6.90 45.24
cemento PVC 0.0036 GLS 1,799.00 1,524.58 274.42 5.49 0.99 6.48
instalación Ventilación de 3" 1.0000 Ud 809.27 809.27 0.00 809.27
COSTO/UD 1,120.37 56.00 1,176.37
1.815 Desague de piso 2" ( incluye rejilla )
sifón drenaje 2" 1.0000 UD 192.29 162.96 29.33 162.96 29.33 192.29
rejilla roscada de 2" HG para piso 1.0000 UD 70.00 59.32 10.68 59.32 10.68 70.00
desague de piso de 2 pulgadas (Incl. Parrilla 1.0000 Ud 809.27 809.27 0.00 809.27
COSTO/UD 1,031.55 40.01 1,071.56
Perforación a percución e instalación de tub 1.0000 pl 1,200.00 1,016.95 183.05 1,016.95 183.05 1,200.00
Tubo Ø8" SDR-26 1.0000 pl 904.51 766.53 137.98 766.53 137.98 904.51
Limpieza de lodos 1.0000 p.a. 75.00 75.00 0.00 75.00
Transporte 1.0000 p.a. 321.03 321.03 0.00 321.03
COSTO/PL 2,179.51 321.03 2,500.54
CAJA OCTAGONAL DE 1/2" 1.0000 UD 120.43 102.06 18.37 102.06 18.37 120.43
EMT DE 1/2" X 10' 1.5000 UD 170.95 144.87 26.08 217.31 39.12 256.43
CURVA EMT DE 1/2" 2.0000 PL 44.33 37.57 6.76 75.14 13.52 88.66
COUPLING EMT DE 1/2" 3.0000 UD 9.36 7.93 1.43 23.80 4.28 28.08
CONECTOR RECTO EMT DE 1/2" 2.0000 UD 13.84 11.73 2.11 23.46 4.22 27.68
ALAMBRE THW #12 45.0000 PL 14.12 11.97 2.15 538.47 96.93 635.40
TAPE 3M SCOTT +33 0.0500 ROLL 416.67 353.11 63.56 17.66 3.18 20.83
ABRAZADERA DE 1/2" 4.0000 UD 2.98 2.53 0.45 10.10 1.82 11.92
TARUGO AZUL C/TORNILLO 4.0000 UD 15.00 12.71 2.29 50.85 9.15 60.00
TORNILLO HEXAGONAL DE 1/4 X 1-1/2" 2.0000 UD 2.05 1.74 0.31 3.48 0.63 4.11
EXPANSION DE 1/4 X 1-1/2" 2.0000 UD 24.00 20.34 3.66 40.68 7.32 48.00
Lamp. Led 2´x 2´- Superf. 1.0000 UD 2,100.00 1,779.66 320.34 1,779.66 320.34 2,100.00
MANO DE OBRA 1.0000 PA 885.94 885.94 0.00 885.94
COSTO/UD 3,768.60 518.88 4,287.47
CAJA RECTANGULAR DE 1/2" 1.0000 UD 120.43 102.06 18.37 102.06 18.37 120.43
Tubos de 1/2'' x 20'', P.V.C. SDR-26 1.5000 UD 113.89 96.52 17.37 144.78 26.06 170.84
Curva plastica 1/2" 2.0000 PL 5.30 4.49 0.81 8.98 1.62 10.60
ALAMBRE THW #12 45.0000 PL 14.12 11.97 2.15 538.47 96.93 635.40
TAPE 3M SCOTT +33 0.0500 ROLL 416.67 353.11 63.56 17.66 3.18 20.83
INT SEN. BTICINO 1.0000 UD 95.00 80.51 14.49 80.51 14.49 95.00
MANO DE OBRA 1.0000 PA 885.94 885.94 0.00 885.94
COSTO/UD 1,778.39 160.64 1,939.04
CAJA RECTANGULAR DE 1/2" 1.0000 UD 120.43 102.06 18.37 102.06 18.37 120.43
Tubos de 1/2'' x 20'', P.V.C. SDR-26 1.5000 UD 113.89 96.52 17.37 144.78 26.06 170.84
Curva plastica 1/2" 2.0000 PL 5.30 4.49 0.81 8.98 1.62 10.60
ALAMBRE THW #12 45.0000 PL 14.12 11.97 2.15 538.47 96.93 635.40
TAPE 3M SCOTT +33 0.0500 ROLL 416.67 353.11 63.56 17.66 3.18 20.83
INT DOBLE BTICINO 1.0000 UD 249.35 211.31 38.04 211.31 38.04 249.35
MANO DE OBRA 1.0000 PA 885.94 885.94 0.00 885.94
COSTO/UD 1,909.20 184.19 2,093.39
Tubo de 1/2" pvc 1.0000 PL 19.30 16.36 2.94 16.36 2.94 19.30
Suministro de alambre 10 3.0000 PL 8.32 7.05 1.27 21.15 3.81 24.95
M.O 0.4000 PL 44.25 17.70 0.00 17.70
COSTO/UD 55.21 6.75 61.96
1.10 PISOS
Malla electrosoldada 2.7 x 2.7 10 x 10 0.1100 QQ 15,500.00 13,135.59 2,364.41 1,444.92 260.08 1,705.00
Hormigon chapapote 1.0500 M3 5,731.64 4,857.32 874.32 5,100.19 918.03 6,018.22
Madera a todo costo (GUARDERAS) 4.0000 ML 225.00 190.68 34.32 762.71 137.29 900.00
Mano obra malla 0.1100 M2 48.14 5.30 0.00 5.30
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 7,567.35 1,315.41 8,882.76
COSTO/MT² 68,794.09 11,958.24 80,752.33
Mosaico De Granito GRIS 1.0500 M2 5,824.00 4,935.59 888.41 5,182.37 932.83 6,115.20
Derretido Cemento Blanco (100 LBS) 0.0700 Fds 1,500.00 1,271.19 228.81 88.98 16.02 105.00
Mezcla 1:4 0.0320 m3 5,912.96 5,010.98 901.98 160.35 28.86 189.21
Colocacion Piso De Mosaicos De Granito 1.0000 m2 373.74 373.74 0.00 373.74
Corte De Chazos De 0.30 Mts 3.0000 Ud 25.00 75.00 0.00 75.00
MO derretido pisos 1.0000 m2 15.45 15.45 0.00 15.45
Herramientas (2%) 0.0200 P.A. 6,409.41 5,431.71 977.71 108.63 19.55 128.19
COSTO/M2 7,001.79
Alq. Compactador maquito 1.00 M3 10.42 8.83 1.59 8.83 1.59 10.42
Peones ( 3 ) 3.0000 Hr 102.97 308.91 0.00 308.91
Combustible (3 Galones/día) 0.3800 Gls 221.60 187.80 33.80 71.36 12.85 84.21
Lubricante 0.1500 Gls 84.21 71.36 12.85 10.70 1.93 12.63
SUB-TOTAL 416.16
Rendimiento 3.0000 Mt³/Hr 416.16 138.72 138.72
Material granular 1.5000 Mt³ 650.00 975.00 0.00 975.00
Regado y mojado 1.0000 Mt³ 175.00 175.00 175.00
Herramienta 0.0200 % 1,113.72 943.83 169.89 18.88 3.40 22.27
COSTO/MT³ 1,307.60 3.40 1,311.00
madera pino americano bruta 0.2200 P2 125.00 105.93 19.07 23.31 4.19 27.50
clavos corrientes con cabeza 2" en adelante 0.1100 LBS 60.00 50.85 9.15 5.59 1.01 6.60
mezcla 1:3 0.0210 m3 6,993.84 5,926.98 1,066.86 124.47 22.40 146.87
Hormigón 140 KG/cms2 (1:3:5) 0.0834 m3 6,116.15 5,183.18 932.97 432.28 77.81 510.09
construcción de ACERA FROTADA y VIOLINA 1.0000 m2 231.61 231.61 0.00 231.61
Herramientas (2%) 0.0200 P.A. 691.06 585.64 105.42 11.71 2.11 13.82
COSTO/MT² 828.96 107.52 936.49
1.12 PUERTAS
1.1201 S/C Puerta Lisa Polimetal (S/Visor) ( Desde 0.7@ 1.00*2.10) inc. Inst
Panel Polimetálico 0.70-1.00 x 2.10 1.0000 UND 7,203.52 6,104.68 1,098.84 6,104.68 1,098.84 7,203.52
Llavín Stanley 1.0000 UND 1,616.17 1,369.64 246.53 1,369.64 246.53 1,616.17
Transporte de Puerta (3%) 0.0300 % 8,819.69 7,474.32 1,345.38 224.23 40.36 264.59
Mano de obra Inst. de Puerta incluye Llavín 1.0000 UND 2,144.73 2,144.73 0.00 2,144.73
COSTO/UD 9,843.27 1,385.74 11,229.01
puerta de evedoor Inc. Marco 1.0000 UD 7,203.52 6,104.68 1,098.84 6,104.68 1,098.84 7,203.52
cerradura TOLEDO doble puño C/llave y SE 1.0000 UD 750.81 636.28 114.53 636.28 114.53 750.81
tarugos plásticoS 3/8" 12.0000 UD 2.54 2.15 0.39 25.82 4.65 30.47
tornillo 3" x 14 12.0000 UD 4.15 3.52 0.63 42.20 7.60 49.80
Bisagra 3.0000 UD 170.85 144.79 26.06 434.37 78.19 512.56
montura de puertas 0.4000 % 8,547.16 3,418.87 0.00 3,418.87
montura de cerradura especial 1.0000 ud 500.00 500.00 0.00 500.00
COSTO/UD 11,162.22 1,303.80 12,466.03
Barra cuadrada 1/2" 4.8500 ud 519.20 440.00 79.20 2,134.00 384.12 2,518.12
Eléctrodo 6013 4.0000 lb 65.04 55.12 9.92 220.47 39.69 260.16
Thinner 0.0500 gl 416.67 353.11 63.56 17.66 3.18 20.83
Aguarra 0.0500 gl 555.87 471.08 84.79 23.55 4.24 27.79
Oxido Rojo 0.1800 gl 900.00 762.71 137.29 137.29 24.71 162.00
Pintura esmalte 0.1900 gl 1,130.00 957.63 172.37 181.95 32.75 214.70
Brocha 1 1/2" 1.0000 ud 101.15 85.72 15.43 85.72 15.43 101.15
Segueta 2.0000 ud 47.75 40.47 7.28 80.93 14.57 95.50
Disco de pulir 0.2500 ud 281.06 238.19 42.87 59.55 10.72 70.27
Mano de Obra 0.3500 % 3,470.52 1,214.68 0.00 1,214.68
COSTO/UD 4,155.80 529.40 4,685.20
COSTO/P² 386.28 49.21 435.49
Ventana de aluminio completa 1.0000 P² 325.00 275.42 49.58 275.42 49.58 325.00
Colocacion de ventana 0.3000 P² 325.00 97.50 0.00 97.50
COSTO/P² 372.92 49.58 422.50
COSTO/MT² 3,967.91 527.49 4,495.40
Barra cuadrada 1/2" 4.8500 ud 519.20 440.00 79.20 2,134.00 384.12 2,518.12
Eléctrodo 6013 4.0000 lb 65.04 55.12 9.92 220.47 39.69 260.16
Thinner 0.0500 gl 416.67 353.11 63.56 17.66 3.18 20.83
Aguarra 0.0500 gl 555.87 471.08 84.79 23.55 4.24 27.79
Oxido Rojo 0.1800 gl 900.00 762.71 137.29 137.29 24.71 162.00
Pintura esmalte 0.1900 gl 1,130.00 957.63 172.37 181.95 32.75 214.70
Brocha 1 1/2" 1.0000 ud 101.15 85.72 15.43 85.72 15.43 101.15
Segueta 2.0000 ud 47.75 40.47 7.28 80.93 14.57 95.50
Disco de pulir 0.2500 ud 281.06 238.19 42.87 59.55 10.72 70.27
Mano de Obra 0.3500 % 3,470.52 1,214.68 0.00 1,214.68
COSTO/UD 4,155.80 529.40 4,685.20
COSTO/P² 386.28 49.21 435.49
Primer de base (1 manos) 0.1100 GLS 900.00 762.71 137.29 83.90 15.10 99.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 109.00 92.37 16.63 1.85 0.33 2.18
COSTO/MT² 52.22 0.33 52.55
pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38
pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38
pintura mantenimiento 0.0800 GLS 1,130.00 957.63 172.37 76.61 13.79 90.40
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 175.40 148.64 26.76 2.97 0.54 3.51
COSTO/MT² 220.42 25.77 246.19
Suministro pintura esmalte 0.0400 GLN 1,130.00 957.63 172.37 38.31 6.89 45.20
Thinner 0.0500 GLN 416.67 353.11 63.56 17.66 3.18 20.83
M.O aplicación dos manos a pistola 1.0000 MT² 75.00 75.00 0.00 75.00
Desperdicios y retoques. 0.2000 66.03 55.96 10.07 11.19 2.01 13.21
COSTO/MT² 142.15 12.09 154.24
1.15 MISCELANEOS
Figurita bronce baño 1.0000 Ud 1,073.42 909.68 163.74 909.68 163.74 1,073.42
Figurita bronce baño 0.1000 % 1,073.42 107.34 0.00 107.34
COSTO/Ud 1,017.02 163.74 1,180.76
1.1601 Replanteo
Cal (50 LBS) 5.0000 FDA 260.00 220.34 39.66 1,101.69 198.31 1,300.00
Clavos Corrientes 20.0000 LBS 60.00 50.85 9.15 1,016.95 183.05 1,200.00
Madera Pino Americano Bruta (3 usos) 66.6667 P2 125.00 105.93 19.07 7,062.15 1,271.19 8,333.33
Clavos Acero 5.0000 LBS 55.10 46.69 8.41 233.47 42.03 275.50
Hilo de nylon 5.0000 LBS 168.30 142.63 25.67 713.14 128.36 841.50
Herramienta de Trabajo a mano 1.0000 PA 1,500.00 1,271.19 228.81 1,271.19 228.81 1,500.00
Maestro de Carpinteria 3.0000 Día 2,471.25 7,413.75 0.00 7,413.75
Maestro de Albañileria 3.0000 Día 2,471.25 7,413.75 0.00 7,413.75
Brigada Reducida Topografia 10.0000 Día 3,500.00 35,000.00 0.00 35,000.00
Estacion total 1.0000 Día 10,000.00 10,000.00 0.00 10,000.00
Carpintero de Segunda Categoria 3.0000 Día 1,568.75 4,706.25 0.00 4,706.25
Trabajador No calificado (TNC) 3.0000 Día 823.75 2,471.25 0.00 2,471.25
COSTO/UD 78,403.59 2,051.75 80,455.33
COSTO/m3 273.16 7.15 11,174.35
EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos
MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32
Sub-Total (3) Mano de Obra 449.32 0.00 449.32
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
Alq. Compactador maquito 1.00 M3 10.42 8.83 1.59 8.83 1.59 10.42
Peones ( 3 ) 3.0000 Hr 102.97 308.91 0.00 308.91
Combustible (3 Galones/día) 0.3800 Gls 221.60 187.80 33.80 71.36 12.85 84.21
Lubricante 0.1500 Gls 84.21 71.36 12.85 10.70 1.93 12.63
SUB-TOTAL 416.16
Rendimiento 3.0000 Mt³/Hr 416.16 138.72 138.72
Material granular 1.5000 Mt³ 650.00 975.00 0.00 975.00
Regado y mojado 1.0000 Mt³ 175.00 175.00 175.00
Herramienta 0.0200 % 1,113.72 943.83 169.89 18.88 3.40 22.27
COSTO/MT³ 1,307.60 3.40 1,311.00
Acero Ø 1/2 ´´ de 20! 1.2710 QQ 3,800.00 3,220.34 684.00 4,829.80 869.36 4,829.80
Acero Ø 3/8 ´´ de 20! 1.7900 QQ 3,800.00 3,220.34 684.00 6,802.00 1,224.36 6,802.00
Hormigon 210 kg/m2 industial 1.0200 M3 7,205.15 6,106.06 1,296.93 7,349.25 1,322.86 7,349.25
Alambre No.18 6.1220 LBS 100.00 84.74 18.00 612.17 110.19 612.17
M.O acero 3.0610 QQ 401.30 1,228.38 0.00 1,228.38
Encofrado 14.2890 ML 600.00 8,573.40 0.00 8,573.40
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 29,649.24 3,526.78 29,649.24
bloques de 0.20 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 57.00 48.31 8.69 621.93 111.95 733.88
acero 1/2" x 20' -G40 0.0850 QQ 3,800.00 3,220.34 579.66 273.73 49.27 323.00
alambre dulce #18 0.1700 Lbs 100.00 84.74 15.25 14.41 2.59 17.00
mezcla 1:3 0.0390 m3 6,993.84 5,926.98 1,066.86 231.15 41.61 272.76
Hormigón 140 KG/cms2 (1:3:5) 0.0890 m3 6,116.15 5,183.18 932.97 461.30 83.03 544.34
colocación bloques de 0.20 mts 13.0000 Ud 26.14 339.81 0.00 339.81
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.20 mts 13.0000 Ud 3.15 40.90 0.00 40.90
Herramientas (2%) 0.0200 P.A. 1,890.97 1,602.52 288.45 32.05 5.77 37.82
COSTO/M2 2,117.22 294.22 2,411.44
1.1612 Zabaletas
Regla (1 de 1"x4"x10' / 100 usos) 0.0333 P2 125.00 105.93 19.07 3.53 0.63 4.16
mezcla 1:1.5:5 (pañete) 0.0300 M3 2,972.64 2,519.19 453.45 75.58 13.60 89.18
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 187.07 187.07 0.00 187.07
Herramientas (2%) 0.0200 P.A. 4.16 3.53 0.63 0.07 0.01 0.08
COSTO/MT² 266.25 14.25 280.50
Suministro de tuberia de 4'' SCH 40 1.0000 ML 265.32 224.85 40.47 224.85 40.47 265.32
Piezas especiales 1.0000 ud 1,200.00 1,016.95 183.05 1,016.95 183.05 1,200.00
Cemento pvc 0.0200 gl 1,799.00 1,524.58 274.42 30.49 5.49 35.98
Asiento de arena 0.0900 m3 1,334.54 120.11 0.00 120.11
Desperdicio 0.0500 M3N 164.99 139.82 25.17 6.99 1.26 8.25
Excavacion de material 0.3600 m3 458.30 164.99 0.00 164.99
Bote de Material 0.3600 m3 1,288.31 463.79 0.00 463.79
Instalacion de tuberias 1.0000 ml 54.17 54.17 0.00 54.17
COSTO/ML 2,082.34 230.27 2,312.61
Tapon hembra de 4" 1.0000 Ud 253.97 215.23 45.71 253.97 45.71 253.97
M.O. Colocacion Tapon hembra de 4" 0.2500 Ud 253.97 63.49 0.00 63.49
COSTO/UD 317.46 45.71 363.18
ANALISIS VARIOS
EQUIPOS:
HERRAMIENTAS 2.0000 % M.O. 8.99 0.00 8.99
Sub-Total (1) Equipos 8.99 0.00 8.99
MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32
Bote de material
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
274.58 274.58
Losa superior
Bloques horm. + 4% desp. + itbis 13.0000 u 44.00 37.29 6.71 484.75 87.25 572.00
Mortero 1:3 en juntas + 30% desp. 0.0312 m3 6,993.84 5,926.98 1,066.86 184.92 33.29 218.21
Horm. en cámaras + 10% desp. 0.0200 m3 5,731.64 4,857.32 874.32 97.15 17.49 114.63
Acero 3/8" x 20' grado 40 + 20% desp. 0.0592 qq 3,800.00 3,220.34 579.66 190.64 34.32 224.96
Alambre No. 18 0.0888 LBS 100.00 84.74 15.25 7.53 1.35 8.88
Corte y amarre varilla. 13.0000 u 1.05 13.66 0.00 13.66
Llenado huecos. 13.0000 u 3.15 40.90 0.00 40.90
Coloc. bloques. 13.0000 u 23.53 305.83 0.00 305.83
COSTO/MT² 1,325.38 173.70 1,499.07
Bloques horm. + 4% desp. + itbis 13.0000 u 44.00 37.29 6.71 484.75 87.25 572.00
Mortero 1:3 en juntas + 30% desp. 0.0312 m3 6,993.84 5,926.98 1,066.86 184.92 33.29 218.21
Horm. en cámaras + 10% desp. 0.0200 m3 5,731.64 4,857.32 874.32 97.15 17.49 114.63
Acero 3/8" x 20' grado 40 + 20% desp. 0.0592 qq 3,800.00 3,220.34 579.66 190.64 34.32 224.96
Alambre No. 18 0.0888 LBS 100.00 84.74 15.25 7.53 1.35 8.88
Corte y amarre varilla. 13.0000 u 1.05 13.66 0.00 13.66
Llenado huecos. 13.0000 u 3.15 40.90 0.00 40.90
Coloc. bloques. 13.0000 u 23.53 305.83 0.00 305.83
COSTO/MT² 1,325.38 173.70 1,499.07
Regla (1 de 1"x4"x10' / 100 usos) 0.0333 P2 125.00 105.93 19.07 3.53 0.63 4.16
mezcla 1: 4 0.0300 M3 5,912.96 5,010.98 901.98 150.33 27.06 177.39
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 112.27 112.27 0.00 112.27
Herramientas (2%) 0.0200 P.A. 4.16 3.53 0.63 0.07 0.01 0.08
COSTO/MT² 266.20 27.71 293.91
mezcla 1:3
cemento gris 11.5100 Fds 480.00 406.78 73.22 4,682.03 842.77 5,524.80
arena gruesa ITABO (de mina) 1.0000 m3 1,200.00 1,200.00 0.00 1,200.00
agua 69.0400 Gls 1.00 69.04 0.00 69.04
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
COSTO/MT³ 6,151.07 842.77 6,993.84
mezcla 1:3-A
cemento gris 11.5100 Fds 480.00 406.78 73.22 4,682.03 842.77 5,524.80
arena gruesa ITABO LAVADA (de PLANTA) 1.0000 m3 1,200.00 1,200.00 0.00 1,200.00
agua 69.0400 Gls 1.00 69.04 0.00 69.04
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
COSTO/MT³ 6,151.07 842.77 6,993.84
mezcla 1:4
cemento gris 9.1100 Fds 480.00 406.78 73.22 3,705.76 667.04 4,372.80
arena gruesa ITABO (de mina) 1.0600 m3 1,200.00 1,272.00 0.00 1,272.00
agua 68.1600 Gls 1.00 68.16 0.00 68.16
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
COSTO/MT³ 5,245.92 667.04 5,912.96
mezcla 1:6
cemento gris 6.4600 Fds 480.00 406.78 73.22 2,627.80 473.00 3,100.80
arena gruesa ITABO (de mina) 1.1200 m3 1,200.00 1,344.00 0.00 1,344.00
agua 67.7200 Gls 1.00 67.72 0.00 67.72
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
COSTO/MT³ 4,239.52 473.00 4,712.52
cemento gris 9.4600 Fds 480.00 406.78 73.22 3,848.14 692.66 4,540.80
arena FINA (para pañete) 0.9100 m3 1,200.00 1,092.00 0.00 1,092.00
cal (50 LBS) 6.2900 Fds 260.00 220.34 39.66 1,385.93 249.47 1,635.40
agua 45.2400 Gls 1.00 45.24 0.00 45.24
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
COSTO/MT³ 2,723.17 249.47 2,972.64
cemento gris 9.4600 Fds 480.00 406.78 73.22 3,848.14 692.66 4,540.80
Arena lavada 0.9100 m3 1,500.00 1,365.00 0.00 1,365.00
cal (50 LBS) 6.2900 Fds 260.00 220.34 39.66 1,385.93 249.47 1,635.40
agua 45.2400 Gls 1.00 45.24 0.00 45.24
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
COSTO/MT³ 2,996.17 249.47 3,245.64
cemento gris 11.9700 Fds 480.00 406.78 73.22 4,869.15 876.45 5,745.60
arena FINA (para pañete) 0.8700 m3 1,500.00 1,305.00 0.00 1,305.00
cal (50 LBS) 6.0000 Fds 260.00 220.34 39.66 1,322.03 237.97 1,560.00
agua 43.1200 Gls 1.00 43.12 0.00 43.12
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
COSTO/MT³ 2,870.15 237.97 3,108.12
cemento gris 40.6100 FDS 480.00 406.78 73.22 16,519.32 2,973.48 19,492.80
agua 121.5200 GLS 1.00 121.52 0.00 121.52
COSTO/MT³ 16,640.84 2,973.48 19,614.32
mezcla 1:2
cemento gris 15.5700 Fds 480.00 406.78 73.22 6,333.56 1,140.04 7,473.60
arena gruesa ITABO (de mina) 0.9000 m3 1,200.00 1,080.00 0.00 1,080.00
agua 70.1000 Gls 1.00 70.10 0.00 70.10
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
COSTO/MT³ 7,683.66 1,140.04 8,823.70
Materiales:
cemento gris 6.3500 Fds 480.00 406.78 73.22 2,583.05 464.95 3,048.00
arena gruesa ITABO LAVADA (de PLANTA) 0.5400 m3 1,500.00 810.00 0.00 810.00
gravilla 3/4 @ 3/8" 0.7300 m3 1,500.00 1,095.00 0.00 1,095.00
agua 64.0000 Gls 1.00 64.00 0.00 64.00
SUB-TOTAL DE MATERIALES 4552.05 464.95 5,017.00
Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 112.66 112.66 0.00 112.66
Ayudante albañil (1) 1.0000 Hr. 112.66 112.66 0.00 112.66
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 328.28 328.28
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 187.59 0.00 187.59
Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 500.00 0.00 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA
HERRAMIENTAS: 5 % M.O. 0.00 0.00 0.00 0.00 0.00
SUB-TOTAL DE EQUIPOS 0.00 0.00 0.00
Materiales:
cemento gris 7.5300 Fds 480.00 406.78 73.22 3,063.05 551.35 3,614.40
arena gruesa ITABO LAVADA (de PLANTA) 0.5200 m3 1,500.00 780.00 0.00 780.00
gravilla 3/4 @ 3/8" 0.7300 m3 1,500.00 1,095.00 0.00 1,095.00
agua 54.6500 Gls 1.00 54.65 0.00 54.65
SUB-TOTAL DE MATERIALES 4992.70 551.35 5,544.05
Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 112.66 112.66 0.00 112.66
Ayudante albañil (1) 1.0000 Hr. 112.66 112.66 0.00 112.66
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 328.28 328.28
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 187.59 0.00 187.59
Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 500.00 0.00 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA
HERRAMIENTAS: 5 % M.O. 0.00 0.00 0.00 0.00 0.00
SUB-TOTAL DE EQUIPOS 0.00 0.00 0.00
Materiales:
cemento gris 8.3100 Fds 480.00 406.78 73.22 3,380.34 608.46 3,988.80
arena gruesa ITABO LAVADA (de PLANTA) 0.5100 m3 1,500.00 765.00 0.00 765.00
gravilla 3/4 @ 3/8" 0.7100 m3 1,500.00 1,065.00 0.00 1,065.00
agua 51.2200 Gls 1.00 51.22 0.00 51.22
SUB-TOTAL DE MATERIALES 5261.56 608.46 5,870.02
Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 112.66 112.66 0.00 112.66
Ayudante albañil (1) 1.0000 Hr. 112.66 112.66 0.00 112.66
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 328.28 328.28
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 187.59 0.00 187.59
Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 500.00 0.00 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA
HERRAMIENTAS: 5 % M.O. 0.00 0.00 0.00 0.00 0.00
SUB-TOTAL DE EQUIPOS 0.00 0.00 0.00
Materiales:
cemento gris 8.9400 Fds 480.00 406.78 73.22 3,636.61 654.59 4,291.20
arena gruesa ITABO LAVADA (de PLANTA) 0.5100 m3 1,500.00 765.00 0.00 765.00
gravilla 3/4 @ 3/8" 0.7000 m3 1,500.00 1,050.00 0.00 1,050.00
agua 51.2200 Gls 1.00 51.22 0.00 51.22
SUB-TOTAL DE MATERIALES 5502.83 654.59 6,157.42
Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 112.66 112.66 0.00 112.66
Ayudante albañil (1) 1.0000 Hr. 112.66 112.66 0.00 112.66
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 328.28 328.28
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 187.59 0.00 187.59
Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 500.00 0.00 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA
HERRAMIENTAS: 5 % M.O. 0.00 0.00 0.00 0.00 0.00
SUB-TOTAL DE EQUIPOS 0.00 0.00 0.00
madera pino americano cepillada 0.2590 P2 111.11 94.16 16.95 24.39 4.39 28.78
mezcla 1:1.5:5 (pañete) 0.0040 m3 7,513.44 6,367.32 1,146.12 25.47 4.58 30.05
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 58.83 49.86 8.97 1.00 0.18 1.18
COSTO/ML 133.19 9.15 142.34
BASE
Excavación Zapata de muro a mano tierra 0.6120 m3 458.30 280.48 0.00 280.48
Relleno de Reposición + 25% 1.1280 m3 163.34 184.25 0.00 184.25
Bote de material + 30% 0.6120 m3 1,288.31 788.45 0.00 788.45
Losa de Tarja Ø3/8´´@0.20m A.D 0.1872 m3 14,979.68 12,694.64 2,285.04 2,376.44 427.76 2,804.20
BNP, Bastones @ 0.40 todos los huecos llen 1.2400 m2 1,629.09 1,380.58 248.50 1,711.92 308.15 2,020.07
SNP, Bastones @ 0.40 todos los huiecos llen 1.2400 m2 1,692.18 1,434.05 258.13 1,778.22 320.08 2,098.30
Fraguache 3.5800 m2 90.45 76.65 13.80 274.41 49.39 323.80
Pañete 3.5800 m2 382.85 324.45 58.40 1,161.52 209.07 1,370.60
Cantos y mochetas 7.0000 ml 142.34 120.63 21.71 844.40 151.99 996.39
Pintura Base 3.5800 m2 52.55 44.53 8.02 159.43 28.70 188.13
Pintura Acrilica 3.5800 m2 276.38 234.22 42.16 838.51 150.93 989.44
COSTO/UND 10,398.02 1,646.07 12,044.10
madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er.
nivel 1.0000 M2 187.07 187.07 0.00 187.07
andamios 1.0000 M2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/MT² 352.98 29.86 382.85
Mocheta
Mortero 1:4 para empañete + 10% desp. 0.0036 M3 5,912.96 5,010.98 901.98 18.04 3.25 21.29
Regla madera americana cepillada 1"x4" / 0.8300 PT 111.11 94.16 16.95 78.15 14.07 92.22
4 usos
Mano de obra mocheta 0.20m 1.0000 ML 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 113.51 96.19 17.31 1.92 0.35 2.27
COSTO/MT² 180.45 17.66 198.11
Andamios Interiores
Madera Pino Americano Bruta 0.1820 P2 125.00 105.93 19.07 19.28 3.47 22.75
Colocación Andamio Interior 0.02 dia 1,964.25 39.29 0.00 39.29
Clavo corriente 0.010 LBS 60.00 50.85 9.15 0.51 0.09 0.60
Herramientas (2%) 0.0200 P.A. 22.75 19.28 3.47 0.39 0.07 0.46
COSTO/MT² 59.46 3.63 63.09
muros block 0.10 mts sin CRUCE 0 3/8" A 0.80 mts BNP
bloques de 0.10 mts (4") TAVARES INDUSTRI 12.8750 Ud 25.00 21.19 3.81 272.78 49.10 321.88
acero 3/8" x 20' -G40 0.0230 QQ 3,800.00 3,220.34 579.66 74.07 13.33 87.40
alambre dulce #18 0.0460 Lbs 100.00 84.74 15.25 3.90 0.70 4.60
mezcla 1:3 0.0300 m3 6,993.84 5,926.98 1,066.86 177.81 32.01 209.82
Hormigón 140 KG/cms2 (1:3:5) 0.0070 m3 6,116.15 5,183.18 932.97 36.28 6.53 42.81
colocación bloques de 0.10 mts. 13.0000 Ud 28.23 366.99 0.00 366.99
llenado de huecos A 0.80 mts 13.0000 Ud 2.10 27.33 0.00 27.33
corte y amarre de acero A 0.80 mts 13.0000 Ud 1.05 13.66 0.00 13.66
Herramientas (2%) 0.0200 P.A. 413.87 350.74 63.13 7.01 1.26 8.28
COSTO/MT² 979.83 102.93 1,082.76
Asiento de arena
derretido cemento blanco (100 LBS) 0.0333 FDS 795.03 673.76 121.28 22.44 4.04 26.47
cerámica 20 x 20 Area de lavado 1.1000 M2 738.83 626.12 112.70 688.74 123.97 812.71
ESTOPA 0.0500 LBS 125.00 105.93 19.07 5.30 0.95 6.25
Pegamento Especial para Ceramica 0.1667 fda 522.00 442.37 79.63 73.73 13.27 87.00
colocación en paredes de losetas cerámica 1.0000 M2 575.71 575.71 0.00 575.71
corte de losetas de cerámica 4.5000 UD 5.00 22.50 0.00 22.50
Herramientas (2%) 0.0300 P.A. 932.43 790.20 142.24 23.71 4.27 27.97
COSTO/MT² 1,412.11 146.50 1,558.62
Llave de chorro
llave chorro 3/4" 1.0000 UD 692.64 586.99 105.66 586.99 105.66 692.64
Tuberia y piezas 1.0000 PA 250.00 211.86 38.14 211.86 38.14 250.00
instalación llave 1.0000 Ud 1,416.63 1,416.63 0.00 1,416.63
COSTO/UD 2,215.48 143.79 2,359.27
Desague de 2"
sifón drenaje 2" 1.0000 UD 87.74 74.36 13.38 74.36 13.38 87.74
rejilla roscada de 2" HG para piso 1.0000 UD 70.00 59.32 10.68 59.32 10.68 70.00
desague de piso de 2 pulgadas (Incl. Parrilla 1.0000 Ud 809.27 809.27 0.00 809.27
COSTO/UD 942.95 24.06 967.01
Primer de base (1 manos) 0.1100 GLS 900.00 762.71 137.29 83.90 15.10 99.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 109.00 92.37 16.63 1.85 0.33 2.18
COSTO/MT² 52.22 0.33 52.55
pintura acrílica
pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38
Bloques horm. + 4% desp. + itbis 13.0000 u 44.00 37.29 7.92 572.00 102.96 572.00
Mortero 1:3 en juntas + 30% desp. 0.0312 m3 6,993.84 5,926.98 1,258.89 218.21 39.28 218.21
Horm. en cámaras + 10% desp. 0.0400 m3 6,116.15 5,183.18 1,100.91 244.65 44.04 244.65
Acero 3/8" x 20' grado 40 + 20% desp. 0.0592 qq 3,800.00 3,220.34 684.00 224.96 40.49 224.96
Alambre No. 18 0.0888 LBS 100.00 84.74 18.00 8.88 1.60 8.88
Corte y amarre varilla. 13.0000 u 1.05 13.66 0.00 13.66
Llenado huecos. 13.0000 u 3.15 40.90 0.00 40.90
Coloc. bloques. 13.0000 u 23.53 305.83 0.00 305.83
Andamio 1.0000 M2 63.09 53.47 11.36 63.09 11.36 63.09
COSTO/MT² 1,692.18 239.72 1,692.18
Pañete
madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. 1.0000 M2 187.07 187.07 0.00 187.07
nivel
andamios 1.0000 M2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/MT² 352.98 29.86 382.85
madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0400 m3 #REF! #REF! #REF! #REF! #REF! #REF!
fino en techo horiz. sin incl. subida de mater 1.0000 m2 164.22 164.22 0.00 164.22
Herramientas (2%) 0.0200 P.A. #REF! #REF! #REF! #REF! #REF! #REF!
COSTO/MT² #REF! #REF! #REF!
Prime + 10% 0.0500 GL/MT² 1,375.00 1,165.25 209.75 58.26 10.49 68.75
Manto asfartico e= 4mm+10% 1.1000 MT² 501.87 425.31 76.56 467.84 84.21 552.06
Pintura de aluminio 0.0500 GL/MT² 1,100.00 932.20 167.80 46.61 8.39 55.00
Aplicación impermeabilizante 1.0000 MT² 26.71 26.71 0.00 26.71
COSTO/MT² 599.43 103.09 702.52
2.3 PINTURA
pintura mantenimiento 0.0800 GLS 1,130.00 957.63 172.37 76.61 13.79 90.40
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 175.40 148.64 26.76 2.97 0.54 3.51
COSTO/MT² 220.42 25.77 246.19
pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0400 m3 #REF! #REF! #REF! #REF! #REF! #REF!
fino en techo horiz. sin incl. subida de mater 1.0000 m2 164.22 164.22 0.00 164.22
Herramientas (2%) 0.0200 P.A. #REF! #REF! #REF! #REF! #REF! #REF!
COSTO/MT² #REF! #REF! #REF!
Prime + 10% 0.0500 GL/MT² 1,375.00 1,165.25 209.75 58.26 10.49 68.75
Manto asfartico e= 4mm+10% 1.1000 MT² 501.87 425.31 76.56 467.84 84.21 552.06
Pintura de aluminio 0.0500 GL/MT² 1,100.00 932.20 167.80 46.61 8.39 55.00
Aplicación impermeabilizante 1.0000 MT² 26.71 26.71 0.00 26.71
COSTO/MT² 599.43 103.09 702.52
3.3 PINTURA
pintura mantenimiento 0.0800 GLS 1,130.00 957.63 172.37 76.61 13.79 90.40
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 175.40 148.64 26.76 2.97 0.54 3.51
COSTO/MT² 220.42 25.77 246.19
pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0400 m3 6,993.84 5,926.98 1,066.86 237.08 42.67 279.75
fino en techo horiz. sin incl. subida de mater 1.0000 m2 114.27 114.27 0.00 114.27
Herramientas (2%) 1.0000 P.A. 7.91 6.71 1.21 6.71 1.21 7.91
COSTO/MT² 359.43 44.13 403.56
Prime + 10% 0.0500 GL/MT² 1,375.00 1,165.25 209.75 58.26 10.49 68.75
Manto asfartico e= 4mm+10% 1.1000 MT² 501.87 425.31 76.56 467.84 84.21 552.06
Pintura de aluminio 0.0500 GL/MT² 1,100.00 932.20 167.80 46.61 8.39 55.00
Aplicación impermeabilizante 1.0000 MT² 26.71 26.71 0.00 26.71
COSTO/MT² 599.43 103.09 702.52
4.3 PINTURA
pintura mantenimiento 0.0800 GLS 1,130.00 957.63 172.37 76.61 13.79 90.40
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 175.40 148.64 26.76 2.97 0.54 3.51
COSTO/MT² 220.42 25.77 246.19
pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0400 m3 6,993.84 5,926.98 1,066.86 237.08 42.67 279.75
fino en techo horiz. sin incl. subida de mater 1.0000 m2 114.27 114.27 0.00 114.27
Herramientas (2%) 1.0000 P.A. 7.91 6.71 1.21 6.71 1.21 7.91
COSTO/MT² 359.43 44.13 403.56
Prime + 10% 0.0500 GL/MT² 1,375.00 1,165.25 209.75 58.26 10.49 68.75
Manto asfartico e= 4mm+10% 1.1000 MT² 501.87 425.31 76.56 467.84 84.21 552.06
Pintura de aluminio 0.0500 GL/MT² 1,100.00 932.20 167.80 46.61 8.39 55.00
Aplicación impermeabilizante 1.0000 MT² 26.71 26.71 0.00 26.71
COSTO/MT² 599.43 103.09 702.52
5.3 PINTURA
pintura mantenimiento 0.0800 GLS 1,130.00 957.63 172.37 76.61 13.79 90.40
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 175.40 148.64 26.76 2.97 0.54 3.51
COSTO/MT² 220.42 25.77 246.19
pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38
EQUIPOS:
HERRAMIENTAS 2.0000 % M.O. 6.25 0.00 6.25
Sub-Total (1) Equipos 6.25 0.00 6.25
MANO DE OBRA:
Picadores 2.0000 días 572.64 1,145.28 0.00 1,145.28
Paleador 1.0000 días 572.64 572.64 0.00 572.64
1,717.92 0.00 1,717.92
RENDIMIENTO: 5.5000 M3/Dia 312.35 0.00 312.35
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
Alq. Compactador maquito 1.00 M3 10.42 8.83 1.88 10.42 1.88 10.42
Peones ( 3 ) 3.0000 Hr 102.97 308.91 0.00 308.91
Combustible (3 Galones/día) 0.3800 Gls 221.60 187.80 39.89 84.21 15.16 84.21
Lubricante 0.1500 Gls 84.21 71.36 15.16 12.63 2.27 12.63
SUB-TOTAL 416.16
Rendimiento 3.0000 Mt³/Hr 416.16 138.72 138.72
Material granular 1.5000 Mt³ 650.00 975.00 0.00 975.00
Regado y mojado 1.0000 Mt³ 175.00 175.00 175.00
Herramienta 0.0200 % 1,113.72 943.83 169.89 18.88 3.40 22.27
COSTO/MT³ 1,307.60 3.40 1,311.00
Bloques horm. + 4% desp. + itbis 13.0000 u 44.00 37.29 6.71 484.75 87.25 572.00
Mortero 1:3 en juntas + 30% desp. 0.0312 m3 6,993.84 5,926.98 1,066.86 184.92 33.29 218.21
Horm. en cámaras + 10% desp. 0.0200 m3 6,116.15 5,183.18 932.97 103.66 18.66 122.32
Acero 3/8" x 20' grado 40 + 20% desp. 0.0592 qq 3,800.00 3,220.34 579.66 190.64 34.32 224.96
Alambre No. 18 0.0888 LBS 100.00 84.74 15.25 7.53 1.35 8.88
Corte y amarre varilla. 13.0000 u 1.05 13.66 0.00 13.66
Llenado huecos. 13.0000 u 3.15 40.90 0.00 40.90
Coloc. bloques. 13.0000 u 23.53 305.83 0.00 305.83
COSTO/MT² 1,331.89 174.87 1,506.76
bloques de 0.15 mts (6") 12.8750 Ud 27.5 23.31 4.19 300.05 54.01 354.06
acero 3/8" x 20' -G40 0.0265 QQ 2,200.00 1,864.41 335.59 49.41 8.89 58.30
alambre dulce #18 0.0640 Lbs 45 38.14 6.86 2.44 0.44 2.88
mezcla 1:3 0.0290 m3 6,993.84 4,591.29 826.43 133.15
Hormigón 140 KG/cms2 (1:3:5) 0.0240 m3 3,955.48 3,352.10 603.38 80.45 14.48 94.93
colocación bloques de 0.15 mts y violinado 13.0000 Ud 16.37 212.81 0.00 212.81
llenado de huecos y violinado ambas caras 13.0000 Ud 1.46 18.98 0.00 18.98
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.46 18.98 0.00 18.98
andamios interiores 1.0000 m2 33.96 28.78 5.18 28.78 5.18 33.96
Herramientas (2%) 0.0200 P.A. 667.29 565.50 101.79 11.31 2.04 13.35
COSTO/MT² 506.90 22.14 529.04
madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 187.07 187.07 0.00 187.07
andamios 1.0000 M2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/MT² 352.98 29.86 382.85
madera pino americano cepillada 0.2590 P2 111.11 94.16 16.95 24.39 4.39 28.78
mezcla 1:1.5:5 (pañete) 0.0040 m3 7,513.44 6,367.32 1,146.12 25.47 4.58 30.05
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 58.83 49.86 8.97 1.00 0.18 1.18
COSTO/ML 133.19 9.15 142.34
Perfiles 2"x 2" x 20' 4.0000 UD 700.00 593.22 106.78 2,372.88 427.12 2,800.00
Tola lisa 4' x 8' x 3/16" 2.0000 UD 3,650.00 3,093.22 556.78 6,186.44 1,113.56 7,300.00
Electrodos 5.0000 lb 548.00 464.41 83.59 2,322.03 417.97 2,740.00
Oxido Rojo 0.7500 gl 730.00 618.64 111.36 463.98 83.52 547.50
Thinner 0.1400 gl 416.67 353.11 63.56 49.44 8.90 58.33
Pintura esmalte 0.7500 gl 1,120.00 949.15 170.85 711.86 128.14 840.00
Brocha de 2" 2.0000 UD 45.00 38.14 6.86 76.27 13.73 90.00
Segueta 2.0000 UD 45.45 38.52 6.93 77.04 13.87 90.91
Disco de Pulir 2.0000 UD 331.47 280.91 50.56 561.82 101.13 662.95
Ruedas porton 2.0000 UND 18.82 15.95 2.87 31.90 5.74 37.64
Riel puerta corrediza 26.2400 PIE 376.36 318.95 57.41 8,369.31 1,506.48 9,875.78
Dispositivo para rodaje 2.0000 UND 245.00 207.63 37.37 415.25 74.75 490.00
Transporte de materiales 0.3000 PA 1,000.00 300.00 0.00 300.00
Mano de Obra 30% 0.3000 P.A. 25,833.11 7,749.93 0.00 7,749.93
COSTO/UD 29,688.16 3,894.88 33,583.04
COSTO/P² 609.11 79.91 689.02
COSTO/MT² 6,553.68 859.80 7,413.47
Primer de base (1 manos) 0.1100 GLS 600.00 508.47 91.53 55.93 10.07 66.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 1.85 1.57 0.28 0.03 0.01 0.04
COSTO/M2 191.41
pintura acrílica (POPULAR) 0.0800 GLS 725.00 614.41 110.59 49.15 8.85 58.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 133.20 112.88 20.32 2.26 0.41 2.66
COSTO/MT² 192.25 20.69 212.94
7 ACTIVIDAD FINAL
ANALISIS VARIOS
EQUIPOS:
HERRAMIENTAS 2.0000 % M.O. 8.99 0.00 8.99
Sub-Total (1) Equipos 8.99 0.00 8.99
MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32
PRELIMINARES
Plywood 3/4 ( 2 usos) 84.0000 m2 674.63 571.72 102.91 48,024.31 8,644.38 56,668.69
Clavos de Zinc 18.0000 LBS 120.00 101.69 18.31 1,830.51 329.49 2,160.00
Madera Pino Americano Bruta (4 usos) 28.0000 P2 125.00 105.93 19.07 2,966.10 533.90 3,500.00
Zinc Calibre 34 (3 x 6) 2 usos 32.0000 PLANCHA 355.10 300.93 54.17 9,629.83 1,733.37 11,363.20
Puerta (0.90 x 2.10 mts.) y Marco 1.0000 UD 5,462.96 4,629.63 833.33 4,629.63 833.33 5,462.96
Albañil de Segunda Categoria 3.0000 Día 1,568.75 4,706.25 0.00 4,706.25
Carpintero de Segunda Categoria 3.0000 Día 1,568.75 4,706.25 0.00 4,706.25
Trabajador No calificado (TNC) 3.0000 Día 823.75 2,471.25 0.00 2,471.25
Herramientas (2%) 0.0200 P.A. 79,154.85 67,080.38 12,074.47 1,341.61 241.49 1,583.10
COSTO/UD 92,621.70
COSTO/M2 1,890.24
Replanteo
Cal (50 LBS) 5.0000 FDA 260.00 220.34 39.66 1,101.69 198.31 1,300.00
Clavos Corrientes 20.0000 LBS 60.00 50.85 9.15 1,016.95 183.05 1,200.00
Madera Pino Americano Bruta (3 usos) 66.6667 P2 125.00 105.93 19.07 7,062.15 1,271.19 8,333.33
Clavos Acero 5.0000 LBS 55.10 46.69 8.41 233.47 42.03 275.50
Hilo de nylon 5.0000 LBS 168.30 142.63 25.67 713.14 128.36 841.50
Herramienta de Trabajo a mano 1.0000 PA 1,500.00 1,271.19 228.81 1,271.19 228.81 1,500.00
Maestro de Carpinteria 3.0000 Día 2,471.25 7,413.75 0.00 7,413.75
Maestro de Albañileria 3.0000 Día 2,471.25 7,413.75 0.00 7,413.75
Brigada Reducida Topografia 10.0000 Día 3,500.00 35,000.00 0.00 35,000.00
Estacion total 1.0000 Día 10,000.00 10,000.00 0.00 10,000.00
Carpintero de Segunda Categoria 3.0000 Día 1,568.75 4,706.25 0.00 4,706.25
Trabajador No calificado (TNC) 3.0000 Día 823.75 2,471.25 0.00 2,471.25
COSTO/UD 80,455.33
COSTO/m2 280.31
MOVIMIENTO DE TIERRA
COSTO RIPPER
COSTO/M3N = 285.29
REND = 8 M3/H
EXTRACCION CON retro catT320 B
COSTO/M3N = 700.00
REND =8M3/H
CARGIO retro CAT320 B
COSTO/M3N =$ 69.05
REND = 70M3/H
coef. Esponj.= 50%
ARRANQUE COSTO/M3N =$ 27.44
COSTO/M3N 1,081.77
MATERIALES:
Sub-Total (2) Materiales
MANO DE OBRA:
Peones 5.0000 Hr. 823.75 4,118.75
Capataz 1.0000 Hr. 1,568.75 1,568.75
RELLENO DE CALICHE EN CAPAS DE 25 CM DE ESPESOR . INCLUYE; MATERIAL, MANO DE OBRA, EQUIPOS Y HERRAMIENTA.
MANO DE OBRA:
Brigada
Capataz 1.0000 Hr 1,568.75 1,568.75
Peones ( 2 ) 2.0000 Hr 823.75 1,647.50
Traslado de Material del Lugar de Acopio 0.3000 Día 823.75 247.13
Agua 15.2200 Gls 1.00 15.22
Sub-Total 3,478.60
EQUIPOS
Compactador manual 1.0000 hr 259.00 259.00
RENDIMIENTO 3.0000 m3/hr
Herramientas 10.0000 % M.O. 18.12
277.12
Sub-Total Equipos 92.37
SUMINISTRO DE MATERIAL
Caliche (20% esponjamiento) 1.1000 m3 125.00 137.50
Transporte 1.0000 m3 503.55 503.55
Sub-total Material 641.05
EQUIPOS:
Camión 6 m3 1.0000 Viaje 1,700.00 1,700.00
MANO DE OBRA:
Peones 2.0000 H/H 102.97 205.94
RENDIMIENTO: 6.0000 M3/Viaje
Costo/M3 319.37
Bote de material (Incl. carguío) D=5km
EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00
MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
TRANSPORTE 235.50
COSTO/M3/E 5.20
Asiento de arena
COSTO$/M3N 379.01
COSTO$/M3N 1,034.00
MUROS DE BLOQUES
bloques de 0.20 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 57.00 48.31 8.69 621.93 111.95 733.88
acero 1/2" x 20' -G40 0.0850 QQ 3,800.00 3,220.34 579.66 273.73 49.27 323.00
alambre dulce #18 0.1700 Lbs 100.00 84.74 15.25 14.41 2.59 17.00
mezcla 1:3 0.0390 m3 6,993.84 5,926.98 1,066.86 231.15 41.61 272.76
Hormigón 140 KG/cms2 (1:3:5) 0.0890 m3 6,116.15 5,183.18 932.97 461.30 83.03 544.34
colocación bloques de 0.20 mts 13.0000 Ud 26.14 339.81 0.00 339.81
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.20 mts 13.0000 Ud 3.15 40.90 0.00 40.90
Herramientas (2%) 0.0200 P.A. 1,890.97 1,602.52 288.45 32.05 5.77 37.82
COSTO/M2 2,411.44
Muros block 0.20 mts s/cruce 0 3/8" A 0.20 mts primer nivel
bloques de 0.20 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 57.00 48.31 8.69 621.93 111.95 733.88
acero 1/2" x 20' -G40 0.0850 QQ 3,800.00 3,220.34 579.66 273.73 49.27 323.00
alambre dulce #18 0.1700 Lbs 100.00 84.74 15.25 14.41 2.59 17.00
mezcla 1:3 0.0390 m3 6,993.84 5,926.98 1,066.86 231.15 41.61 272.76
Hormigón 140 KG/cms2 (1:3:5) 0.0890 m3 6,116.15 5,183.18 932.97 461.30 83.03 544.34
colocación bloques de 0.20 mts 13.0000 Ud 26.14 339.81 0.00 339.81
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.20 mts 13.0000 Ud 3.15 40.90 0.00 40.90
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 1,890.97 1,602.52 288.45 32.05 5.77 37.82
COSTO/M2 2,434.87
bloques de 0.20 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 57.00 48.31 8.69 621.93 111.95 733.88
acero 3/8" x 20' -G40 0.0210 QQ 3,800.00 3,220.34 579.66 67.63 12.17 79.80
alambre dulce #18 0.0420 Lbs 100.00 84.74 15.25 3.56 0.64 4.20
mezcla 1:3 0.0390 m3 6,993.84 5,926.98 1,066.86 231.15 41.61 272.76
Hormigón 140 KG/cms2 (1:3:5) 0.0220 m3 6,116.15 5,183.18 932.97 114.03 20.53 134.56
colocación bloques de 0.20 mts 13.0000 Ud 26.14 339.81 0.00 339.81
llenado de huecos A 0.80 mts 13.0000 Ud 2.10 27.33 0.00 27.33
corte y amarre de acero A 0.80 mts 13.0000 Ud 1.05 13.66 0.00 13.66
Herramientas (2%) 0.0200 P.A. 1,225.19 1,038.30 186.89 20.77 3.74 24.50
COSTO/M2 1,630.49
Muros block 0.20 mts s/cruce 0 3/8" A 0.80 mts 1er. Nivel
bloques de 0.20 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 57.00 48.31 8.69 621.93 111.95 733.88
acero 3/8" x 20' -G40 0.0210 QQ 3,800.00 3,220.34 579.66 67.63 12.17 79.80
alambre dulce #18 0.0420 Lbs 100.00 84.74 15.25 3.56 0.64 4.20
mezcla 1:3 0.0390 m3 6,993.84 5,926.98 1,066.86 231.15 41.61 272.76
Hormigón 140 KG/cms2 (1:3:5) 0.0290 m3 6,116.15 5,183.18 932.97 150.31 27.06 177.37
colocación bloques de 0.20 mts 13.0000 Ud 26.14 339.81 0.00 339.81
llenado de huecos A 0.80 mts 13.0000 Ud 2.10 27.33 0.00 27.33
corte y amarre de acero A 0.80 mts 13.0000 Ud 1.05 13.66 0.00 13.66
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 1,268.00 1,074.58 193.42 21.49 3.87 25.36
COSTO/M2 1,697.60
bloques de 0.20 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 57.00 48.31 8.69 621.93 111.95 733.88
acero 3/8" x 20' -G40 0.0300 QQ 3,800.00 3,220.34 579.66 96.61 17.39 114.00
alambre dulce #18 0.0600 Lbs 100.00 84.74 15.25 5.08 0.92 6.00
mezcla 1:3 0.0400 m3 6,993.84 5,926.98 1,066.86 237.08 42.67 279.75
Hormigón 140 KG/cms2 (1:3:5) 0.0370 m3 6,116.15 5,183.18 932.97 191.78 34.52 226.30
colocación bloques de 0.20 mts 13.0000 Ud 26.14 339.81 0.00 339.81
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 20.52 0.00 20.52
Herramientas (2%) 0.0200 P.A. 1,359.93 1,152.48 207.45 23.05 4.15 27.20
COSTO/M2 1,788.35
Muros block 0.20 mts s/cruce 0 3/8" A 0.60 mts 1er. Nivel
bloques de 0.20 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 57.00 48.31 8.69 621.93 111.95 733.88
acero 3/8" x 20' -G40 0.0300 QQ 3,800.00 3,220.34 579.66 96.61 17.39 114.00
alambre dulce #18 0.0600 Lbs 100.00 84.74 15.25 5.08 0.92 6.00
mezcla 1:3 0.0400 m3 6,993.84 5,926.98 1,066.86 237.08 42.67 279.75
Hormigón 140 KG/cms2 (1:3:5) 0.0370 m3 6,116.15 5,183.18 932.97 191.78 34.52 226.30
colocación bloques de 0.20 mts 13.0000 Ud 26.14 339.81 0.00 339.81
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 20.52 0.00 20.52
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 1,359.93 1,152.48 207.45 23.05 4.15 27.20
COSTO/M2 1,811.79
Muros block 0.25 mts s/cruce 0 3/8" A 0.60 mts 1er. Nivel
bloques de 0.25 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 90.00 76.27 13.73 981.99 176.76 1,158.75
acero 3/8" x 20' -G40 0.0300 QQ 3,800.00 3,220.34 579.66 96.61 17.39 114.00
alambre dulce #18 0.0600 Lbs 100.00 84.74 15.25 5.08 0.92 6.00
mezcla 1:3 0.0050 m3 6,993.84 5,926.98 1,066.86 29.63 5.33 34.97
Hormigón 140 KG/cms2 (1:3:5) 0.0425 m3 6,116.15 5,183.18 932.97 220.29 39.65 259.94
colocación bloques de 0.25 mts 13.0000 Ud 48.36 628.69 0.00 628.69
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 20.52 0.00 20.52
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 1,573.66 1,333.61 240.05 26.67 4.80 31.47
COSTO/M2 2,318.68
bloques de 0.20 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 57.00 48.31 8.69 621.93 111.95 733.88
acero 3/8" x 20' -G40 0.0500 QQ 3,800.00 3,220.34 579.66 161.02 28.98 190.00
alambre dulce #18 0.1000 Lbs 100.00 84.74 15.25 8.47 1.53 10.00
mezcla 1:3 0.0390 m3 6,993.84 5,926.98 1,066.86 231.15 41.61 272.76
Hormigón 140 KG/cms2 (1:3:5) 0.0900 m3 6,116.15 5,183.18 932.97 466.49 83.97 550.45
colocación bloques de 0.20 mts 13.0000 Ud 26.14 339.81 0.00 339.81
llenado de huecos A 0.40 mts 13.0000 Ud 4.22 54.89 0.00 54.89
corte y amarre de acero A 0.40 mts 13.0000 Ud 2.10 27.33 0.00 27.33
Herramientas (2%) 0.0200 P.A. 1,757.09 1,489.06 268.03 29.78 5.36 35.14
COSTO/M2 2,214.25
bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 3/8" x 20' -G40 0.0320 QQ 3,800.00 3,220.34 579.66 103.05 18.55 121.60
alambre dulce #18 0.0640 Lbs 100.00 84.74 15.25 5.42 0.98 6.40
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 KG/cms2 (1:3:5) 0.0240 m3 6,116.15 5,183.18 932.97 124.40 22.39 146.79
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 20.52 0.00 20.52
Herramientas (2%) 0.0200 P.A. 694.50 588.56 105.94 11.77 2.12 13.89
COSTO/M2 1,425.25
bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 1/2" x 20' -G40 0.0380 QQ 3,800.00 3,220.34 579.66 122.37 22.03 144.40
alambre dulce #18 0.0760 Lbs 100.00 84.74 15.25 6.44 1.16 7.60
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 KG/cms2 (1:3:5) 0.0190 m3 6,116.15 5,183.18 932.97 98.48 17.73 116.21
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.80 mts 13.0000 Ud 2.10 27.33 0.00 27.33
corte y amarre de acero A 0.80 mts 13.0000 Ud 1.05 13.66 0.00 13.66
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 718.50 608.90 109.60 12.18 2.19 14.37
COSTO/M2 1,422.15
bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 3/8" x 20' -G40 0.0320 QQ 3,800.00 3,220.34 579.66 103.05 18.55 121.60
alambre dulce #18 0.0640 Lbs 100.00 84.74 15.25 5.42 0.98 6.40
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 KG/cms2 (1:3:5) 0.0240 m3 6,116.15 5,183.18 932.97 124.40 22.39 146.79
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 20.52 0.00 20.52
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 694.50 588.56 105.94 11.77 2.12 13.89
COSTO/M2 1,448.68
bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 3/8" x 20' -G40 0.0420 QQ 3,800.00 3,220.34 579.66 135.25 24.35 159.60
alambre dulce #18 0.0840 Lbs 100.00 84.74 15.25 7.12 1.28 8.40
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 Kg/cms2 (1:3:5) 0.0590 m3 6,116.15 5,183.18 932.97 305.81 55.05 360.85
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.40 mts 13.0000 Ud 2.10 1.78 0.32 23.16 4.17 27.33
Herramientas (2%) 0.0200 P.A. 734.50 622.46 112.04 12.45 2.24 14.69
COSTO/M2 1,747.95
muros block 0.10 mts sin CRUCE 0 3/8" A 0.80 mts BNP
bloques de 0.10 mts (4") TAVARES INDUSTRI 12.8750 Ud 25.00 21.19 3.81 272.78 49.10 321.88
acero 3/8" x 20' -G40 0.0230 QQ 3,800.00 3,220.34 579.66 74.07 13.33 87.40
alambre dulce #18 0.0460 Lbs 100.00 84.74 15.25 3.90 0.70 4.60
mezcla 1:3 0.0300 m3 6,993.84 5,926.98 1,066.86 177.81 32.01 209.82
Hormigón 140 KG/cms2 (1:3:5) 0.0070 m3 6,116.15 5,183.18 932.97 36.28 6.53 42.81
colocación bloques de 0.10 mts. 13.0000 Ud 28.23 366.99 0.00 366.99
llenado de huecos A 0.80 mts 13.0000 Ud 2.10 27.33 0.00 27.33
corte y amarre de acero A 0.80 mts 13.0000 Ud 1.05 13.66 0.00 13.66
Herramientas (2%) 0.0200 P.A. 413.87 350.74 63.13 7.01 1.26 8.28
COSTO/M2 1,082.76
muros block 0.10 mts sin CRUCE 0 3/8" A 0.80 mts 1er. Nivel
bloques de 0.10 mts (4") TAVARES INDUSTRI 12.8750 Ud 25.00 21.19 3.81 272.78 49.10 321.88
acero 3/8" x 20' -G40 0.0230 QQ 3,800.00 3,220.34 579.66 74.07 13.33 87.40
alambre dulce #18 0.0460 Lbs 100.00 84.74 15.25 3.90 0.70 4.60
mezcla 1:3 0.0300 m3 6,993.84 5,926.98 1,066.86 177.81 32.01 209.82
Hormigón 140 KG/cms2 (1:3:5) 0.0070 m3 6,116.15 5,183.18 932.97 36.28 6.53 42.81
colocación bloques de 0.10 mts. 13.0000 Ud 28.23 366.99 0.00 366.99
llenado de huecos A 0.80 mts 13.0000 Ud 2.10 27.33 0.00 27.33
corte y amarre de acero A 0.80 mts 13.0000 Ud 1.05 13.66 0.00 13.66
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 413.87 350.74 63.13 7.01 1.26 8.28
COSTO/M2 1,106.20
muros block 0.10 mts sin CRUCE 0 3/8" A 0.60 mts BNP
bloques de 0.10 mts (4") TAVARES INDUSTRI 12.8750 Ud 25.00 21.19 3.81 272.78 49.10 321.88
acero 3/8" x 20' -G40 0.0300 QQ 3,800.00 3,220.34 579.66 96.61 17.39 114.00
alambre dulce #18 0.0600 Lbs 100.00 84.74 15.25 5.08 0.92 6.00
mezcla 1:3 0.0400 m3 6,993.84 5,926.98 1,066.86 237.08 42.67 279.75
Hormigón 140 KG/cms2 (1:3:5) 0.0300 m3 6,116.15 5,183.18 932.97 155.50 27.99 183.48
colocación bloques de 0.10 mts. 13.0000 Ud 28.23 366.99 0.00 366.99
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 20.52 0.00 20.52
Herramientas (2%) 0.0200 P.A. 441.87 374.47 67.40 7.49 1.35 8.84
COSTO/M2 1,342.36
muros block 0.10 mts sin CRUCE 0 3/8" A 0.60 mts 1er. Nivel
bloques de 0.10 mts (4") TAVARES INDUSTRI 12.8750 Ud 25.00 21.19 3.81 272.78 49.10 321.88
acero 3/8" x 20' -G40 0.0300 QQ 3,800.00 3,220.34 579.66 96.61 17.39 114.00
alambre dulce #18 0.0600 Lbs 100.00 84.74 15.25 5.08 0.92 6.00
mezcla 1:3 0.0400 m3 6,993.84 5,926.98 1,066.86 237.08 42.67 279.75
Hormigón 140 KG/cms2 (1:3:5) 0.0300 m3 6,116.15 5,183.18 932.97 155.50 27.99 183.48
colocación bloques de 0.10 mts. 13.0000 Ud 28.23 366.99 0.00 366.99
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 20.52 0.00 20.52
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 441.87 374.47 67.40 7.49 1.35 8.84
COSTO/M2 1,365.80
TERMINACION DE SUPERFICIE
madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 187.07 187.07 0.00 187.07
andamios 1.0000 M2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/M2 382.85
Pañete en Techos
madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 242.13 242.13 0.00 242.13
andamios 1.0000 M2 34.68 29.39 5.29 29.39 5.29 34.68
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/M2 449.14
madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,786.44 6,598.68 1,187.76 145.17 26.13 171.30
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 187.07 187.07 0.00 187.07
andamios 1.0000 M2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 174.97 148.28 26.69 2.97 0.53 3.50
COSTO/M2 388.97
Cantos
madera pino americano cepillada 0.2590 P2 111.11 94.16 16.95 24.39 4.39 28.78
mezcla 1:1.5:5 (pañete) 0.0040 m3 7,513.44 6,367.32 1,146.12 25.47 4.58 30.05
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 58.83 49.86 8.97 1.00 0.18 1.18
COSTO/ML 142.34
madera pino americano cepillada 0.2733 P2 111.11 94.16 16.95 25.73 4.63 30.37
clavos acero 0.0137 LBS 55.10 46.69 8.41 0.64 0.12 0.75
mezcla 1:1.5:5 (pañete) 0.0065 m3 7,513.44 6,367.32 1,146.12 41.07 7.39 48.46
estrías 1.0000 ml 164.67 164.67 0.00 164.67
Herramientas (2%) 0.0200 P.A. 79.58 67.44 12.14 1.35 0.24 1.59
COSTO/ML 245.84
Pañete en muros piscina
madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
Pool Cote 1.0000 M2 650.00 550.85 99.15 550.85 99.15 650.00
Mano de Obra pañete 1.0000 M2 238.09 238.09 0.00 238.09
Limpieza especial muros con acido muriatic 1.0000 M2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 653.67 553.95 99.71 11.08 1.99 13.07
COSTO/M2 914.83
madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0500 m3 6,993.84 5,926.98 1,066.86 296.35 53.34 349.69
Cal hidratada 0.1380 fda 260.00 220.34 39.66 30.41 5.47 35.88
Sxpel 0.0460 m3 267.12 226.37 40.75 10.41 1.87 12.29
fino en techo horiz. sin incl. subida de mater 1.0000 m2 16.00 16.00 0.00 16.00
Herramientas (2%) 0.0200 P.A. 387.20 328.13 59.06 6.56 1.18 7.74
COSTO/M2 423.23
madera pino americano cepillada para mol 1.0000 P2 111.11 94.16 16.95 94.16 16.95 111.11
mezcla 1:1.5:5 (pañete) 0.0100 m3 7,513.44 6,367.32 1,146.12 63.67 11.46 75.13
MO alto relieve 1.0000 ml 7.50 7.50 0.00 7.50
Herramientas (2%) 0.0200 P.A. 186.24 157.83 28.41 3.16 0.57 3.72
COSTO/ML 197.47
ANDAMIOS
Andamios Interiores
Madera Pino Americano Bruta 0.1820 P2 125.00 105.93 19.07 19.28 3.47 22.75
Colocación Andamio Interior 1.0000 m2 0.23 0.23 0.00 0.23
Herramientas (2%) 0.0200 P.A. 22.75 19.28 3.47 0.39 0.07 0.46
COSTO/M2 23.44
Andamios en techos
Plywood 3/4" (Dos Caras) 0.0083 Plancha 4,000.00 3,389.83 610.17 28.24 5.08 33.32
Colocación Andamio 1.0000 m2 0.69 0.69 0.00 0.69
Herramientas (2%) 0.0200 P.A. 33.32 28.24 5.08 0.56 0.10 0.67
COSTO/M2 34.68
Andamios Exteriores
Madera Pino Americano Bruta 1.0600 P2 125.00 105.93 19.07 112.29 20.21 132.50
Clavos Corrientes Con Cabeza 2" En Adelant 0.2410 lbs 60.00 50.85 9.15 12.25 2.21 14.46
Clavos Acero 0.1330 lbs 55.10 46.69 8.41 6.21 1.12 7.33
Confección E Instalación De Andamios Exter 6.5200 p2 30.00 195.60 0.00 195.60
COSTO/M2 349.89
TERMINACION DE PISOS
derretido cemento blanco (100 LBS) 0.0333 Fds 1,500.00 1,271.19 228.81 42.33 7.62 49.95
Porcelanato 1.1000 M2 800.00 677.97 122.03 745.76 134.24 880.00
ESTOPA 0.0500 LB 125.00 105.93 19.07 5.30 0.95 6.25
mezcla 1:4 0.0500 M3 5,912.96 5,010.98 901.98 250.55 45.10 295.65
Pegamento Especial para Ceramica 0.1667 fda 522.00 442.37 79.63 73.73 13.27 87.00
MO piso de CERAMICA 1.0000 M2 477.58 477.58 0.00 477.58
corte de losetas de CERAMICA 3.0000 UD 5.00 15.00 0.00 15.00
Herramientas (2%) 0.0200 P.A. 1,318.85 1,117.67 201.18 22.35 4.02 26.38
COSTO/M2 1,837.81
derretido cemento blanco (100 LBS) 0.0333 Fds 1,500.00 1,271.19 228.81 42.33 7.62 49.95
Porcelanato 1.1000 M2 989.99 838.97 151.02 922.87 166.12 1,088.99
ESTOPA 0.0500 LB 125.00 105.93 19.07 5.30 0.95 6.25
mezcla 1:4 0.0500 M3 5,912.96 5,010.98 901.98 250.55 45.10 295.65
Pegamento Especial para Ceramica 0.1667 fda 522.00 442.37 79.63 73.73 13.27 87.00
MO piso de CERAMICA 1.0000 M2 477.58 477.58 0.00 477.58
corte de losetas de CERAMICA 3.0000 UD 5.00 15.00 0.00 15.00
Herramientas (2%) 0.0200 P.A. 1,527.84 1,294.78 233.06 25.90 4.66 30.56
COSTO/M2 2,050.98
derretido cemento blanco (100 LBS) 0.0333 Fds 1,500.00 1,271.19 228.81 42.33 7.62 49.95
Ceramica 1.1000 M2 500.00 423.73 76.27 466.10 83.90 550.00
ESTOPA 0.0500 LB 125.00 105.93 19.07 5.30 0.95 6.25
mezcla 1:4 0.0500 M3 5,912.96 5,010.98 901.98 250.55 45.10 295.65
Pegamento Especial para Ceramica 0.1667 fda 522.00 442.37 79.63 73.73 13.27 87.00
MO piso de CERAMICA 1.0000 M2 477.58 477.58 0.00 477.58
corte de losetas de CERAMICA 3.0000 UD 5.00 15.00 0.00 15.00
Herramientas (2%) 0.0200 P.A. 988.85 838.01 150.84 16.76 3.02 19.78
COSTO/M2 1,501.21
madera pino americano bruta 1.0000 P2 125.00 105.93 19.07 105.93 19.07 125.00
Hormigón 180 KG/cms2 industrial 0.1000 m3 6,852.58 5,807.27 1,045.31 580.73 104.53 685.26
M.O. piso de Hormigon pulido 1.0000 m2 181.35 181.35 0.00 181.35
Herramientas (2%) 0.0200 P.A. 810.26 16.21 0.00 16.21
COSTO/M2 1,007.82
COSTO/M3 10,078.18
madera pino americano bruta 1.0000 P2 125.00 105.93 19.07 105.93 19.07 125.00
Hormigón 180 KG/cms2 industrial 0.1000 m3 6,852.58 5,807.27 1,045.31 580.73 104.53 685.26
malla electro soldada 1.0000 m2 127.65 108.18 19.47 108.18 19.47 127.65
M.O. piso de Hormigon pulido 1.0000 m2 181.35 181.35 0.00 181.35
mano de obra malla 1.0000 m2 92.05 92.05 0.00 92.05
pulido con helicoptero 1.0000 m2 120.00 120.00 0.00 120.00
Herramientas (2%) 0.0200 P.A. 937.91 794.84 143.07 15.90 2.86 18.76
COSTO/M2 1,350.07
COSTO/M3 9,764.70
Mosaico De Granito negro 1.0500 M2 5,824.00 4,935.59 888.41 5,182.37 932.83 6,115.20
Derretido Cemento Blanco (100 LBS) 0.0700 Fds 1,500.00 1,271.19 228.81 88.98 16.02 105.00
Mezcla 1:4 0.0320 m3 5,912.96 5,010.98 901.98 160.35 28.86 189.21
Colocacion Piso De Mosaicos De Granito 1.0000 m2 373.74 373.74 0.00 373.74
Corte De Chazos De 0.30 Mts 3.0000 Ud 25.00 75.00 0.00 75.00
MO derretido pisos 1.0000 m2 15.45 15.45 0.00 15.45
Herramientas (2%) 0.0200 P.A. 6,409.41 5,431.71 977.71 108.63 19.55 128.19
COSTO/M2 7,001.79
madera pino americano bruta 1.0000 P2 125.00 105.93 19.07 105.93 19.07 125.00
Hormigón 180 KG/cms2(industrial) 0.1050 m3 6,852.58 5,807.27 1,045.31 609.76 109.76 719.52
Preparacion del terreno 1.0000 m2 20.00 20.00 0.00 20.00
Suministro y colocacion estampado 1.0000 m2 281.02 238.15 42.87 238.15 42.87 281.02
malla electrosoldada 15 x 15 1.0000 m2 102.60 86.95 15.65 86.95 15.65 102.60
mano de obra malla electrosoldada 15 x 15 1.0000 m2 92.05 92.05 0.00 92.05
Herramientas (2%) 0.0200 P.A. 1,248.14 1,057.75 190.39 21.15 3.81 24.96
COSTO/M2 1,365.15
COSTO/M3 10,502.12
TERMINACION DE ESCALERAS
derretido cemento blanco (100 LBS) 0.0250 FDS 1,500.00 1,271.19 228.81 31.78 5.72 37.50
huella y contrahuella 0.5500 m2 5,824.00 4,935.59 888.41 2,714.58 488.62 3,203.20
mezcla 1:3 0.0068 m3 6,993.84 5,926.98 1,066.86 40.30 7.25 47.56
Hormigón 140 KG/cms2 (1:3:5) 0.0214 m3 6,116.15 5,183.18 932.97 110.92 19.97 130.89
madera pino americano bruta 0.2733 P2 125.00 105.93 19.07 28.95 5.21 34.16
clavos acero 0.1093 LBS 55.10 46.69 8.41 5.10 0.92 6.02
clavos corrientes con cabeza 2" en adelante 0.1093 LBS 60.00 50.85 9.15 5.56 1.00 6.56
confección de escalones revestidos de mezc 1.0000 ml 308.75 308.75 0.00 308.75
montura de escalones en escaleras 1.0000 ml 358.19 358.19 0.00 358.19
Herramientas (2%) 0.0200 P.A. 3,465.89 2,937.19 528.69 58.74 10.57 69.32
COSTO/ML 4,202.14
Escalones de PORCELANATO
derretido cemento blanco (100 LBS) 0.0250 FDS 1,500.00 1,271.19 228.81 31.78 5.72 37.50
huella y contrahuella PORCELANATO 0.6600 m2 500.00 423.73 76.27 279.66 50.34 330.00
Bisel para escalones .05 x .45 2.5000 ud 200.00 169.49 30.51 423.73 76.27 500.00
Hormigón 140 KG/cms2 (1:3:5) 0.0214 m3 6,116.15 5,183.18 932.97 110.92 19.97 130.89
madera pino americano bruta 0.2733 P2 125.00 105.93 19.07 28.95 5.21 34.16
clavos acero 0.1093 LBS 55.10 46.69 8.41 5.10 0.92 6.02
clavos corrientes con cabeza 2" en adelante 0.1093 LBS 60.00 50.85 9.15 5.56 1.00 6.56
confección de escalones revestidos de mezc 1.0000 ml 308.75 308.75 0.00 308.75
montura de escalones en escaleras 1.0000 ml 358.19 358.19 0.00 358.19
Herramientas (2%) 0.0200 P.A. 1,038.57 880.14 158.43 17.60 3.17 20.77
COSTO/ML 1,732.84
derretido para marmol 0.0250 FDS 1,351.00 1,144.92 206.08 28.62 5.15 33.78
huella y contrahuella 0.6600 m2 3,071.29 2,602.79 468.50 1,717.84 309.21 2,027.05
mezcla 1:3 0.0068 m3 6,993.84 5,926.98 1,066.86 40.30 7.25 47.56
Hormigón 140 KG/cms2 (1:3:5) 0.0214 m3 6,116.15 5,183.18 932.97 110.92 19.97 130.89
madera pino americano bruta 0.2733 P2 125.00 105.93 19.07 28.95 5.21 34.16
clavos acero 0.1093 LBS 55.10 46.69 8.41 5.10 0.92 6.02
clavos corrientes con cabeza 2" en adelante 0.1093 LBS 60.00 50.85 9.15 5.56 1.00 6.56
confección de escalones revestidos de mezc 1.0000 ml 308.75 308.75 0.00 308.75
montura de escalones en escaleras 1.0000 ml 716.38 716.38 0.00 716.38
Herramientas (2%) 0.0200 P.A. 2,286.01 1,937.30 348.71 38.75 6.97 45.72
COSTO/ML 3,356.86
derretido cemento blanco (100 LBS) 0.0250 FDS 1,500.00 1,271.19 228.81 31.78 5.72 37.50
Descanso en granito 1.0500 m2 5,824.00 4,935.59 888.41 5,182.37 932.83 6,115.20
mezcla 1:4 0.0320 M3 5,912.96 5,010.98 901.98 160.35 28.86 189.21
madera pino americano bruta 0.2733 P2 125.00 105.93 19.07 28.95 5.21 34.16
clavos acero 0.1093 LBS 55.10 46.69 8.41 5.10 0.92 6.02
clavos corrientes con cabeza 2" en adelante 0.1093 LBS 60.00 50.85 9.15 5.56 1.00 6.56
MO Colocacion de piso 1.0000 M2 373.74 373.74 0.00 373.74
MO derretido pisos 1.0000 m2 15.45 15.45 0.00 15.45
Herramientas (2%) 0.0200 P.A. 6,388.66 5,414.12 974.54 108.28 19.49 127.77
COSTO/M2 6,905.62
REVESTIMIENTO
derretido cemento blanco (100 LBS) 0.0333 FDS 1,500.00 1,271.19 228.81 42.33 7.62 49.95
Cerámica de Baños Porcelanato 1.1000 M2 800.00 677.97 122.03 745.76 134.24 880.00
ESTOPA 0.0500 LBS 125.00 105.93 19.07 5.30 0.95 6.25
Pegamento Especial para Ceramica 0.1667 fda 215.00 182.20 32.80 30.37 5.47 35.83
colocación en paredes de losetas cerámica 1.0000 M2 329.73 329.73 0.00 329.73
corte de losetas de cerámica 4.5000 UD 5.00 22.50 0.00 22.50
Herramientas (2%) 1.0000 P.A. 25.96 22.00 3.96 22.00 3.96 25.96
COSTO/M2 1,350.23
derretido cemento blanco (100 LBS) 0.0333 FDS 1,500.00 1,271.19 228.81 42.33 7.62 49.95
cerámica 20 x 20 Area de lavado 1.1000 M2 500.00 423.73 76.27 466.10 83.90 550.00
ESTOPA 0.0500 LBS 125.00 105.93 19.07 5.30 0.95 6.25
Pegamento Especial para Ceramica 0.1667 fda 215.00 182.20 32.80 30.37 5.47 35.83
colocación en paredes de losetas cerámica 1.0000 M2 329.73 329.73 0.00 329.73
corte de losetas de cerámica 4.5000 UD 5.00 22.50 0.00 22.50
Herramientas (2%) 1.0000 P.A. 19.36 16.41 2.95 16.41 2.95 19.36
COSTO/M2 1,013.63
Cenefa 0.10 x 0.25 1.0500 ML 160.00 135.59 24.41 142.37 25.63 168.00
Derretido 0.0110 Fds 800.00 677.97 122.03 7.46 1.34 8.80
Pegamento Especial para Ceramica 0.0167 fda 215.00 182.20 32.80 3.04 0.55 3.58
colocación listelo/cenefa 1.0000 ML 55.84 55.84 0.00 55.84
Herramientas (2%) 1.0000 P.A. 4.72 4.00 0.72 4.00 0.72 4.72
COSTO/ML 240.95
Revestimiento de piedra androcita 1.1000 m2 842.16 713.69 128.47 785.06 141.31 926.38
mezcla 1:3 0.0210 m3 6,993.84 5,926.98 1,066.86 124.47 22.40 146.87
colocación de piedra 1.0000 m2 494.60 494.60 0.00 494.60
Cantos de lajas 1.0000 ml 142.34 120.63 21.71 120.63 21.71 142.34
Derretido para piedras 0.0330 Fds 456.11 386.53 69.58 12.76 2.30 15.05
Herramientas (2%) 1.0000 P.A. 36.37 30.82 5.55 30.82 5.55 36.37
COSTO/M2 1,761.61
Revestimiento en coralina
Derretido para Marmol 0.0333 Fds 1,351.00 1,144.92 206.08 38.13 6.86 44.99
Marmol crema marfil 1.1000 M2 3,071.29 2,602.79 468.50 2,863.07 515.35 3,378.42
Pegamento Especial (Laticrete) 0.2222 fda 1,216.58 1,031.00 185.58 229.11 41.24 270.35
ESTOPA 0.0500 LB 125.00 105.93 19.07 5.30 0.95 6.25
Mezcla 1:3 0.0210 M3 6,993.84 5,926.98 1,066.86 124.47 22.40 146.87
Colocación de mármol para revestimiento 1.0000 M2 577.03 577.03 0.00 577.03
MO derretido pisos 1.0000 m2 15.45 15.45 0.00 15.45
Herramientas (2%) 1.0000 P.A. 87.45 74.11 13.34 74.11 13.34 87.45
COSTO/M2 4,526.81
ladrillos BIZCOCHOS 2x2x8" 72.0000 UD 20.00 16.95 3.05 1,220.34 219.66 1,440.00
mezcla 1:3 0.0160 m3 6,993.84 5,926.98 1,066.86 94.83 17.07 111.90
ESTOPA 0.0500 LBS 125.00 105.93 19.07 5.30 0.95 6.25
gasoil 0.0050 GLS 205.70 174.32 31.38 0.87 0.16 1.03
colocación de ladrillos LIMPIOS A una cara 0.0700 MILLAR 8,655.45 605.88 0.00 605.88
corte de ladrillos 0.0429 m2 17.50 0.75 0.00 0.75
Herramientas (2%) 1.0000 P.A. 42.28 35.83 6.45 35.83 6.45 42.28
COSTO/M2 2,208.09
PINTURA
pintura acrílica (POPULAR) 0.1100 GLS 700.00 593.22 106.78 65.25 11.75 77.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 1.0000 P.A. 2.31 1.96 0.35 1.96 0.35 2.31
COSTO/M2 231.59
Primer de base (1 manos) 0.1100 GLS 698.56 592.00 106.56 65.12 11.72 76.84
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 18.20 18.20 0.00 18.20
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 1.0000 P.A. 2.06 1.75 0.31 1.75 0.31 2.06
COSTO/M2 182.11
Primer de base (1 manos) 0.1100 GLS 600.00 508.47 91.53 55.93 10.07 66.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 18.20 18.20 0.00 18.20
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 1.0000 P.A. 1.85 1.57 0.28 1.57 0.28 1.85
COSTO/M2 171.05
Pintura Sherwin williams 0.1100 GLS 1,062.00 900.00 162.00 99.00 17.82 116.82
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 1.0000 P.A. 3.11 2.63 0.47 2.63 0.47 3.11
COSTO/M2 272.21
Pintura Semigloss 0.1100 GLS 1,045.00 885.59 159.41 97.42 17.53 114.95
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 1.0000 P.A. 3.07 2.60 0.47 2.60 0.47 3.07
COSTO/M2 270.30
pintura mantenimiento 0.0800 GLS 1,130.00 957.63 172.37 76.61 13.79 90.40
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 175.40 148.64 26.76 2.97 0.54 3.51
COSTO/MT² 220.42 25.77 246.19
TERMINACION DE TECHO
madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0700 m3 6,993.84 5,926.98 1,066.86 414.89 74.68 489.57
fino en techo horiz. sin incl. subida de mater 1.0000 m2 99.33 99.33 0.00 99.33
Herramientas (2%) 1.0000 P.A. 7.78 6.60 1.19 6.60 1.19 7.78
COSTO/M2 598.31
madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0350 m3 #REF! #REF! #REF! #REF! #REF! #REF!
fino en techo horiz. sin incl. subida de mater 1.0000 m2 131.38 131.38 0.00 131.38
Herramientas (2%) 0.0200 P.A. #REF! #REF! #REF! #REF! #REF! #REF!
COSTO/MT2 #REF! #REF! #REF!
Zabaleta
Goteros de ranura
mezcla 1:1.5:5 (pañete) 0.0003 m3 4,082.74 3,459.95 622.79 1.04 0.19 1.22
andamios interiores 1.0000 m2 9.52 8.06 1.45 8.06 1.45 9.52
goteros en ranuras 1.0000 ml 99.58 84.39 15.19 84.39 15.19 99.58
Herramientas (2%) 1.0000 P.A. 2.21 1.87 0.34 1.87 0.34 2.21
COSTO/ML 112.53
Bloques en muros de 6" 5.0000 m2 860.60 729.32 131.28 3,646.62 656.39 4,303.01
Pañete en muros interior 10.0000 m2 249.47 211.42 38.05 2,114.17 380.55 2,494.71
Cantos 10.0000 mL 142.34 120.63 21.71 1,206.28 217.13 1,423.41
Pintura acrilica 10.0000 m2 117.91 99.93 17.99 999.25 179.87 1,179.12
Herramientas (2%) 1.0000 P.A. 175.59 148.81 26.79 148.81 26.79 175.59
COSTO/TOTAL 9,575.85
COSTO/Ml 1,791.05
Bloques en muros de 6" 1.0000 m2 860.60 729.32 131.28 729.32 131.28 860.60
Pañete en muros interior 2.0000 m2 249.47 211.42 38.05 422.83 76.11 498.94
Cantos 10.0000 mL 142.34 120.63 21.71 1,206.28 217.13 1,423.41
Pintura acrilica 2.0000 m2 117.91 99.93 17.99 199.85 35.97 235.82
Herramientas (2%) 1.0000 P.A. 47.96 40.65 7.32 40.65 7.32 47.96
COSTO/TOTAL 3,066.74
COSTO/Ml 489.23
MISCELANEOS
Bloques en muros de 8" 5.0000 m2 1,024.31 868.06 156.25 4,340.29 781.25 5,121.54
Pañete muros 10.0000 m2 249.47 211.42 38.05 2,114.17 380.55 2,494.71
Cantos 10.0000 mL 142.34 120.63 21.71 1,206.28 217.13 1,423.41
Pintura acrilica 10.0000 m2 117.91 99.93 17.99 999.25 179.87 1,179.12
Herramientas (2%) 1.0000 P.A. 191.96 162.68 29.28 162.68 29.28 191.96
COSTO/TOTAL 10,410.75
COSTO/Ml 1,958.03
Trabajador no Calificado ( 2 Hombres 6mes 285.9600 DIA 497.95 142,393.78 0.00 142,393.78
Herramientas y materiales de limpieza 1.0000 PA 5,000.00 4,237.29 762.71 4,237.29 762.71 5,000.00
147,393.78
M. O.Transporte Interno
Materiales : 51.1200
Madera bruta 2'' x 4'' ( para Puntales) + 3 % 8.2400 P2 125.00 105.93 19.07 872.88 157.12 1,030.00
Desp. / 6usos
Madera bruta 2'' x 4'' ( para amarres y 41.2000 P2 125.00 105.93 19.07 4,364.41 785.59 5,150.00
Vientos ) + 5 % Desp. / 6 usos
Clavos corrientes de 2'' y 3'' un rehuso de 9.6000 Lbs 35.00 29.66 5.34 284.75 51.25 336.00
30 %
Clavos acero 4.0896 Lbs 55.10 46.69 8.41 190.96 34.37 225.34
Costo/madera 6,741.34
Confección y desmonte:
Brigada :
Maestro 0.2500 H/Día 1,495.00 373.75 0.00 373.75
Carpintero de 1ra ( 1/ hombre) 2.0000 H/Día 1,186.08 2,372.16 0.00 2,372.16
Ayudante ( 1/hombre/Día) 2.0000 H/Día 497.95 995.90 0.00 995.90
Movimiento de madera ( 1.0/hombre/Día) 2.0000 H/Día 497.95 995.90 0.00 995.90
2,368.86
Herramientas 0.0500 % 118.44
MATERIALES:
Suministro de paragoma 1.0000 ud 816.64 692.07 124.57 692.07 124.57 816.64
Tornillo para fijacion 4.0000 ud 20.00 16.95 3.05 67.80 12.20 80.00
pintura trafico 1.0000 pa 100.00 84.75 15.25 84.75 15.25 100.00
MANO DE OBRA:
colocacion 1.0000 ud 100.00 100.00 0.00 100.00
COSTO/UD 1,126.64
madera pino americano bruta 0.2200 P2 125.00 105.93 19.07 23.31 4.19 27.50
clavos corrientes con cabeza 2" en adelante 0.1100 LBS 60.00 50.85 9.15 5.59 1.01 6.60
mezcla 1:3 0.0210 m3 6,993.84 5,926.98 1,066.86 124.47 22.40 146.87
Hormigón 140 KG/cms2 (1:3:5) 0.0840 m3 6,116.15 5,183.18 932.97 435.39 78.37 513.76
construcción de ACERA FROTADA y VIOLINA 1.0000 m2 139.98 139.98 0.00 139.98
Herramientas (2%) 1.0000 P.A. 11.15 9.45 1.70 9.45 1.70 11.15
COSTO/M2 845.85
Conten
madera pino americano bruta 1.0800 P2 125.00 105.93 19.07 114.41 20.59 135.00
clavos corrientes con cabeza 2" en adelante 0.5400 LBS 60.00 50.85 9.15 27.46 4.94 32.40
Hormigón 140 KG/cms2 (1:3:5) 0.1020 m3 6,116.15 5,183.18 932.97 528.68 95.16 623.85
cemento gris 0.0278 FDS 480.00 406.78 73.22 11.31 2.04 13.34
construcción de contenes con bordillo de 3 1.0000 ml 145.66 145.66 0.00 145.66
Herramientas (2%) 1.0000 P.A. 12.27 10.40 1.87 10.40 1.87 12.27
COSTO / ML 962.53
madera pino americano bruta 1.0800 P2 125.00 105.93 19.07 114.41 20.59 135.00
clavos corrientes con cabeza 2" en adelante 0.5400 LBS 60.00 50.85 9.15 27.46 4.94 32.40
Hormigón 140 KG/cms2 (1:3:5) 0.1200 m3 6,116.15 5,183.18 932.97 621.98 111.96 733.94
cemento gris 0.0278 FDS 480.00 406.78 73.22 11.31 2.04 13.34
construcción de contenes con bordillo de 3 1.0000 ml 145.66 145.66 0.00 145.66
Herramientas (2%) 1.0000 P.A. 13.65 11.56 2.08 11.56 2.08 13.65
COSTO / ML 1,073.99
Confeccion de base de hormigon para apoyo 1.0000 ud 9,500.00 9,500.00 0.00 9,500.00
Escalones de madera en roble 16.8000 ml 3,000.00 2,542.37 457.63 42,711.86 7,688.14 50,400.00
baranda en vidrio templadometalica 5.2000 ml 7,500.00 6,355.93 1,144.07 33,050.85 5,949.15 39,000.00
Perfil metalico 16.8000 ml 200.00 169.49 30.51 2,847.46 512.54 3,360.00
COSTO/UD 102,260.00
Jardineras H=1.20 mts (incluye muros de bloques de 0.15 mts, pañete, pintura, cantos e impermeabilizante)
MANO DE OBRA:
trabajador calificado 1.0000 dia 545.01 545.01 0.00 545.01
ayudante 1.0000 dia 640.55 640.55 0.00 640.55
MANO DE OBRA:
trabajador calificado 1.0000 dia 545.01 545.01 0.00 545.01
ayudante 1.0000 dia 640.55 640.55 0.00 640.55
Costo/ml 150.57
Tramo en closedmaid
ENCACHE DE PIEDRA
Espejos para baños 1.0000 M2 2,421.00 2,051.69 369.31 2,051.69 369.31 2,421.00
Herramientas 1.0000 M2 200.00 169.49 30.51 169.49 30.51 200.00
montura de espejos 1.0000 M2 650.00 650.00 0.00 650.00
Herramientas (2%) 1.0000 P.A. 65.42 55.44 9.98 55.44 9.98 65.42
COSTO/M2 3,336.42
Barra para cortina de baños 1er. nivel
barra de aluminio 3/4" para cortina de baño 6.0000 PL 41.67 35.31 6.36 211.86 38.14 250.00
cubrefalta niquelado de ½" 2.0000 UD 7.41 6.28 1.13 12.56 2.26 14.82
tarugos plásticoS 3/8" 4.0000 UD 1.17 0.99 0.18 3.97 0.71 4.68
tornillo 1½" x 12 4.0000 UD 3.30 2.79 0.50 11.17 2.01 13.18
montura de accesorios empotrados 1.0000 UD 450.00 450.00 0.00 450.00
Herramientas (2%) 1.0000 P.A. 14.65 12.42 2.24 12.42 2.24 14.65
COSTO/UD 747.34
barra de aluminio 3/4" para cortina de baño 6.0000 PL 35.77 30.31 5.46 181.86 32.74 214.60
cubrefalta niquelado de ½" 2.0000 UD 7.41 6.28 1.13 12.56 2.26 14.82
tarugos plásticoS 3/8" 4.0000 UD 1.17 0.99 0.18 3.97 0.71 4.68
tornillo 1½" x 12 4.0000 UD 3.30 2.79 0.50 11.17 2.01 13.18
montura de accesorios empotrados 1.0000 UD 250.00 250.00 0.00 250.00
Herramientas (2%) 1.0000 P.A. 9.95 8.43 1.52 8.43 1.52 9.95
COSTO/ML 277.17
ZAPATAS
Acero ? 3/8" G-40 mts 1.0700 QQ 3,800.00 3,220.34 579.66 3,445.76 620.24 4,066.00
Acero ? 3/4" G-40 mts 4.3000 QQ 3,800.00 3,220.34 579.66 13,847.46 2,492.54 16,340.00
Alambre #18 10.7400 lbs 100.00 84.74 15.25 910.13 163.82 1,073.95
Hormigon 240 kg/m2 FLUIDO PARA PILOTES 1.5800 M3 5,800.00 4,915.25 884.75 7,766.10 1,397.90 9,164.00
Mano obra acero 5.3700 qq 250.00 1,342.50 0.00 1,342.50
limpieza y descapote de pilotes 1.0000 m3 1,742.52 1,742.52 0.00 1,742.52
barrenado 1.0000 UD 52,411.79 44,416.77 7,995.02 44,416.77 7,995.02 52,411.79
Doblaje de varilla 6.0000 UD 40.00 240.00 0.00 240.00
recogida material excavado 2.2608 m3 305.12 689.82 0.00 689.82
RD$/UD 78,395.19
Platea (12.0x12.0x0.80) mts. ACERO ADICIONAL Ø 3/4 @ 0.20 , Ø 1 @ 0.15 LX CAMADA INFERIOR, Ø 1 @ 0.10 LY CAMADA INFERIOR, Ø 3/4 @ 0.25 LX CAMADA SUPERIOR
COLUMNAS
Muro Perimetral de contencion e=0.20 mts Ø 1/2 @ 0.20 A.V. Ø 3/8 @ 0.20 A.H.
VIGA DE AMARRE, DINTEL (0.15 X 0.20 MTS.) mts L >1.5 M Asup 2 Ø 3/8", est Ø 3/8 @ 0.30 ,Ainf 3 Ø 1/2"
VIGA DE AMARRE, DINTEL (0.20 X 0.20 MTS.) mts L >1.5 M Asup 2 Ø 3/8", est Ø 3/8 @ 0.30 ,Ainf 3 Ø 1/2"
VIGAS PORTICOS
30*0.40) mts , Acero Superior 6 Ø 3/4" , Acero inferior 3 Ø 1" , Adicionales en cada nudo 3 Ø 1",Est Ø 3/8 @ 0.10 en toda la longitud
, Acero Superior 3 Ø 3/4" , Acero inferior 6 Ø 1" , Adicionales en cada nudo 3 Ø 1",Est Ø 3/8 @ 0.10 en nudos y Est Ø 3/8 @ 0.20 en vano central
LOSAS
Acero Malla 2.5 X 2.5(10 x 10) 10.0000 M2 145.83 123.58 22.25 1,235.85 222.45 1,458.30
Hormigon 280 kg/m2 (Inc. bombeo) 1.0500 M3 6,500.00 5,508.47 991.53 5,783.90 1,041.10 6,825.00
Mano obra acero Malla 10.0000 M2 30.00 300.00 0.00 300.00
Uso del equipo Helicotero para Topping 10.0000 M2 120.00 1,200.00 0.00 1,200.00
RD$/M3 9,832.20
RD$/M2 983.22
Acero Malla 2.5 X 2.5(10 x 10) 20.0000 M2 145.83 123.58 22.25 2,471.69 444.91 2,916.60
Hormigon 280 kg/m2 (Inc. bombeo) 1.0500 M3 6,500.00 5,508.47 991.53 5,783.90 1,041.10 6,825.00
Mano obra acero Malla 20.0000 M2 30.00 600.00 0.00 600.00
Uso del equipo Helicotero para Topping 20.0000 M2 120.00 2,400.00 0.00 2,400.00
RD$/M3 12,839.40
RD$/M2 641.97
Acero G-40 en nervios de 1/2" 3.9600 QQ 3,800.00 3,220.34 579.66 12,752.54 2,295.46 15,048.00
Acero G-40 en nervios de 3/8" 1.3700 QQ 3,800.00 3,220.34 579.66 4,411.86 794.14 5,206.00
Acero adicional de 3/8" 1.0900 QQ 3,800.00 3,220.34 579.66 3,510.17 631.83 4,142.00
Alambre #18 12.8400 lbs 100.00 84.74 15.25 1,088.09 195.86 1,283.95
Hormigon 280 kg/m2 (Inc. bombeo) 1.0500 M3 6,500.00 5,508.47 991.53 5,783.90 1,041.10 6,825.00
Madera a todo costo 34.3600 M2 260.00 8,933.60 0.00 8,933.60
Mano obra acero en nervios 55.7700 ml 40.00 2,230.80 0.00 2,230.80
Mano de obra acero adicional 1.0900 QQ 250.00 272.50 0.00 272.50
Suministro Bloques Aligerados 0.15 x 0.40 x 13.0000 UD 404.55 342.84 61.71 4,456.91 802.24 5,259.15
Mano de obra colocacion de Bloques aliger 13.0000 UD 30.00 390.00 0.00 390.00
Subida de Acero Nervios (10%) 55.7700 ml 4.00 223.08 0.00 223.08
Subida de Acero (10%) 1.0900 qq 25.00 27.25 0.00 27.25
Subida de Madera 3.4400 M2 260.00 894.40 0.00 894.40
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
RD$/TOTAL 40,487.34
RD$/M3 7,854.86
RD$/M2 1,178.23
Malla electrosoldada 2.5 x 2.5(10 X 10) 6.6700 M2 145.83 123.58 22.25 824.31 148.38 972.69
Hormigon 240 kg/m2 (Inc. bombeo) 1.0500 M3 5,800.00 4,915.25 884.75 5,161.02 928.98 6,090.00
Madera a todo costo (GUARDERAS) 4.0000 ML 150.00 600.00 0.00 600.00
Mano obra malla 6.6700 M2 30.00 200.10 0.00 200.10
Uso del equipo Helicotero 6.6700 M2 120.00 800.40 0.00 800.40
Fibra para aumentar resistencia hormigon 2.0000 LBS 153.40 130.00 23.40 260.00 46.80 306.80
RD$/M3 9,001.60
RD$/M2 1,350.24
RAMPAS
Acero ¢1/2 G-40 2.2600 QQ 3,800.00 3,220.34 579.66 7,277.97 1,310.03 8,588.00
Acero ¢3/8 G-40 0.4000 QQ 3,800.00 3,220.34 579.66 1,288.14 231.86 1,520.00
Alambres #18 5.3100 LB 100.00 84.74 15.25 449.98 81.00 530.98
Hormigon 280 kg/m2 (Inc. bombeo) 1.0500 M3 6,500.00 5,508.47 991.53 5,783.90 1,041.10 6,825.00
Madera a todo costo 6.6700 M2 260.00 1,734.20 0.00 1,734.20
Armado rampa escalera 1.0000 Rampa 2,500.00 2,500.00 0.00 2,500.00
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
RD$/M3 17,533.83
LISTADO DE SUBCONTRATOS
DIVISIONES LIGERAS
MISCELANEOS
IMPERMEABILIZANTE
MISCELANEOS
ANALISIS VARIOS
madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. 1.0000 M2 187.07 187.07 0.00 187.07
nivel
andamios 1.0000 M2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/MT² 352.98 29.86 382.85
madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 242.13 242.13 0.00 242.13
andamios 1.0000 M2 34.68 29.39 5.29 29.39 5.29 34.68
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/MT² 417.56 31.58 449.14
Pañete en columnas
Mortero 1:4 de empañete. 0.0150 M3 5,912.96 5,010.98 901.98 75.16 13.53 88.69
Regla madera americana cepillada 1"x4" / 2 0.0250 P2 111.11 94.16 16.95 2.35 0.42 2.78
Andamios en madera 1.0000 M2 34.68 29.39 5.29 29.39 5.29 34.68
Mano de obra empañete techos y vigas 1.0000 M2 242.13 242.13 0.00 242.13
COSTO/MT² 349.03 19.24 368.27
Goteros de ranura
mezcla 1:1.5:5 (pañete) 0.0003 m3 7,513.44 6,367.32 1,146.12 1.91 0.34 2.25
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
goteros en ranuras 1.0000 ml 164.67 139.55 25.12 139.55 25.12 164.67
Herramientas (2%) 0.0200 P.A. 2.25 1.91 0.34 0.04 0.01 0.05
COSTO/ML 161.36 29.04 190.40
madera pino americano cepillada 0.2590 P2 111.11 94.16 16.95 24.39 4.39 28.78
mezcla 1:1.5:5 (pañete) 0.0040 m3 7,513.44 6,367.32 1,146.12 25.47 4.58 30.05
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 58.83 49.86 8.97 1.00 0.18 1.18
COSTO/ML 133.19 9.15 142.34
PERSONAL POR LA CASA PARA VACIADOS(REND. 30.00 M3)
mezcla 1:3
cemento gris 11.5100 Fds 480.00 406.78 73.22 4,682.03 842.77 5,524.80
arena gruesa ITABO (de mina) 1.0000 m3 1,200.00 1,200.00 0.00 1,200.00
agua 69.0400 Gls 1.00 69.04 0.00 69.04
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
Total partida mezcla 1:3 costo/m3 6,993.84
mezcla 1:3-A
cemento gris 11.5100 Fds 480.00 406.78 73.22 4,682.03 842.77 5,524.80
arena gruesa ITABO LAVADA (de PLANTA) 1.0000 m3 1,200.00 1,200.00 0.00 1,200.00
agua 69.0400 Gls 1.00 69.04 0.00 69.04
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
Total partida mezcla 1:3-A costo/m3 6,993.84
mezcla 1:4
cemento gris 9.1100 Fds 480.00 406.78 73.22 3,705.76 667.04 4,372.80
arena gruesa ITABO (de mina) 1.0600 m3 1,200.00 1,272.00 0.00 1,272.00
agua 68.1600 Gls 1.00 68.16 0.00 68.16
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
Total partida mezcla 1:4 costo/m3 5,912.96
mezcla 1:6
cemento gris 6.4600 Fds 480.00 406.78 73.22 2,627.80 473.00 3,100.80
arena gruesa ITABO (de mina) 1.1200 m3 1,200.00 1,344.00 0.00 1,344.00
agua 67.7200 Gls 1.00 67.72 0.00 67.72
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
Total partida mezcla 1:6 costo/m3 4,712.52
cemento gris 9.4600 Fds 480.00 406.78 73.22 3,848.14 692.66 4,540.80
arena FINA (para pañete) 0.9100 m3 1,200.00 1,092.00 0.00 1,092.00
cal (50 LBS) 6.2900 Fds 260.00 220.34 39.66 1,385.93 249.47 1,635.40
agua 45.2400 Gls 1.00 45.24 0.00 45.24
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
Total Partida Mezcla 1:1.5:5 costo/m3 7,513.44
cemento gris 9.4600 Fds 480.00 406.78 73.22 3,848.14 692.66 4,540.80
Arena lavada 0.9100 m3 1,500.00 1,365.00 0.00 1,365.00
cal (50 LBS) 6.2900 Fds 260.00 220.34 39.66 1,385.93 249.47 1,635.40
agua 45.2400 Gls 1.00 45.24 0.00 45.24
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
Total Partida Mezcla 1:1.5:5 costo/m3 7,786.44
cemento gris 11.9700 Fds 480.00 406.78 73.22 4,869.15 876.45 5,745.60
arena FINA (para pañete) 0.8700 m3 1,500.00 1,305.00 0.00 1,305.00
cal (50 LBS) 6.0000 Fds 260.00 220.34 39.66 1,322.03 237.97 1,560.00
agua 43.1200 Gls 1.00 43.12 0.00 43.12
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
Total Partida Mezcla 1:2:5 costo/m3 8,853.72
cemento gris 40.6100 FDS 480.00 406.78 73.22 16,519.32 2,973.48 19,492.80
agua 121.5200 GLS 1.00 121.52 0.00 121.52
Total partida mezcla para natilla costo/m3 9,867.92
mezcla 1:2
cemento gris 15.5700 Fds 480.00 406.78 73.22 6,333.56 1,140.04 7,473.60
arena gruesa ITABO (de mina) 0.9000 m3 1,200.00 1,080.00 0.00 1,080.00
agua 70.1000 Gls 1.00 70.10 0.00 70.10
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
Total Partida Mezcla 1:2:5 costo/m3 8,823.70
Materiales:
cemento gris 6.3500 Fds 480.00 406.78 73.22 2,583.05 464.95 3,048.00
arena gruesa ITABO LAVADA (de PLANTA) 0.5400 m3 1,500.00 810.00 0.00 810.00
gravilla 3/4 @ 3/8" 0.7300 m3 1,500.00 1,095.00 0.00 1,095.00
agua 64.0000 Gls 1.00 64.00 0.00 64.00
SUB-TOTAL DE MATERIALES 5,017.00
Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 245.53 245.53 0.00 245.53
Ayudante albañil (1) 1.0000 Hr. 132.34 132.34 0.00 132.34
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 477.30
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 272.75
Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 423.73 76.27 423.73 76.27 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA 285.71
HERRAMIENTAS: 5 % M.O. 13.64
SUB-TOTAL DE EQUIPOS 299.35
Materiales:
cemento gris 7.5300 Fds 480.00 406.78 73.22 3,063.05 551.35 3,614.40
arena gruesa ITABO LAVADA (de PLANTA) 0.5200 m3 1,500.00 780.00 0.00 780.00
gravilla 3/4 @ 3/8" 0.7300 m3 1,500.00 1,095.00 0.00 1,095.00
agua 54.6500 Gls 1.00 54.65 0.00 54.65
SUB-TOTAL DE MATERIALES 5,544.05
Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 245.53 245.53 0.00 245.53
Ayudante albañil (1) 1.0000 Hr. 132.34 132.34 0.00 132.34
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 477.30
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 272.75
Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 423.73 76.27 423.73 76.27 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA 285.71
HERRAMIENTAS: 5 % M.O. 13.64
SUB-TOTAL DE EQUIPOS 299.35
Materiales:
cemento gris 8.3100 Fds 480.00 406.78 73.22 3,380.34 608.46 3,988.80
arena gruesa ITABO LAVADA (de PLANTA) 0.5100 m3 1,500.00 765.00 0.00 765.00
gravilla 3/4 @ 3/8" 0.7100 m3 1,500.00 1,065.00 0.00 1,065.00
agua 51.2200 Gls 1.00 51.22 0.00 51.22
SUB-TOTAL DE MATERIALES 5,870.02
Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 245.53 245.53 0.00 245.53
Ayudante albañil (1) 1.0000 Hr. 132.34 132.34 0.00 132.34
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 290.57
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 166.04
Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 423.73 76.27 423.73 76.27 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA 285.71
HERRAMIENTAS: 5 % M.O. 8.30
SUB-TOTAL DE EQUIPOS 294.02
Materiales:
cemento gris 8.9400 Fds 480.00 406.78 73.22 3,636.61 654.59 4,291.20
arena gruesa ITABO LAVADA (de PLANTA) 0.5100 m3 1,500.00 765.00 0.00 765.00
gravilla 3/4 @ 3/8" 0.7000 m3 1,500.00 1,050.00 0.00 1,050.00
agua 51.2200 Gls 1.00 51.22 0.00 51.22
SUB-TOTAL DE MATERIALES 6,157.42
Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 245.53 245.53 0.00 245.53
Ayudante albañil (1) 1.0000 Hr. 132.34 132.34 0.00 132.34
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 290.57
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 166.04
Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 423.73 76.27 423.73 76.27 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA 285.71
HERRAMIENTAS: 5 % M.O. 8.30
SUB-TOTAL DE EQUIPOS 294.02
PRESUPUESTO
DESCRIPCIÓN DE LA OBRA AMPLIACIÓN Y READECUACIÓN DE ÁREA DE EMERGENCIA
NOMBRE DEL CENTRO HOSPITAL MUNICIPAL DE VICENTE NOBLE
MUNICIPIO VICENTE NOBLE
PROVINCIA BARAHONA
FECHA DE ELABORACIÓN OCT.2022
NOMBRE DE OFERENTE/RNC
TOTAL GENERAL RD$0.00
2.02 Excavación de material a cielo abierto, con equipo 45.50 m³N 0.00
2.05 Bote material inservible (incluye traslado y carguío) 19.44 m³E 0.00
5.02 Pañete maestreado en muros exteriores (con mortero 1:4) 266.89 m² 0.00
5.03 Pañete maestreado en muros interiores (con mortero 1:4) 606.57 m² 0.00
5.04 Pañete maestreado en vigas y techos (con mortero 1:4) 212.75 m² 0.00
5.05 Pañete maestreado columnas aisladas (con mortero 1:4) 117.77 m² 0.00
C Ventanas 0.00
F Ventilaciones 0.00
12.17 Ventilación de ø3" PVC SDR-41 5.00 UD 0.00
G Misceláneos 0.00
Suministro y colocación de tinacos de 530 gal. (incluye
12.18 2.00 UD 0.00
tuberías, piezas y mano de obra)
20.05 Acarreo de bote material (incluye traslado y carguío) 27.54 m3e 0.00
20.24 Pintura acrílica en exteriores, calidad superior (dos capas). 143.00 M2 0.00
F Pinturas 0.00
26.008 Zanja IC-302 de 1.20m x 0.4m (Incluye tuberia PVC de 3") 100.00 ML 0.00
B Generador 0.00
Generador Eléctrico de 175kVA-208/120Vac, 60Hz. 3F.
Consumo máximo de combustible de:
- 28 gal/h al 100% de la carga,
- 21 gal/h al 75% de la carga,
- 9.93 gal/h al 50% de la carga.
Gobernador Electrónico, Máxima potencia acústica de
70dB, Grado de protección mecánica del generador IP23,
Regulación de voltaje automática, Distorsión armónica
menor a un 2%, Velocidad de sobregiro 2250 rpm, Banco
de baterias de 12/24 Vdc,
Controlador con protecciones contra:
26.013 - Fallo de arranque 1.00 UD 0.00
- Baja presión de aceite
- Baja tensión de batería
- Baja/alta frecuencia
- Sobregiro
- Alta temperatura de refrigerante
Controlador con medidores de:
- Tension entre lineas
- Tension linea-neutro
- Corrientes/-Frecuencia
- Potencia Aparente, activa y reactiva
- Factor de potencia
F Alimentadores 0.00
26.053 Salida cenital en tuberia EMT de 3/4" para Luminaria 80.00 UD 0.00
26.054 Salida de pared en tuberia EMT de 3/4" para Luminaria 10.00 UD 0.00
GASTOS INDIRECTOS: $ -
1.00 Dirección Técnica 10.00% -
2.00 ITBIS Norma 07-07 DGII 18.00% -
3.00 Gastos Administrativos 3.00% -
4.00 Transporte 3.00% -
5.00 Seguros y Fianzas 2.50% -
6.00 Pensión y Jubilación 1.00% -
7.00 Codia 0.10% -
Estudios, diseños, gestiones, sometimiento y/o
8.00 2.00% -
tramitaciones.
9.00 Imprevistos 5.00% -
TOTAL GENERAL RD$0.00
Notas Generales:
1 Las cantidades descritas en este presupuesto deben ser validadas en obra por la supervisión y cubicadas de acuerdo a las medidas levantadas en campo.
2 Los precios alzados (PA) serán pagados mediante desglose de partidas, previamente conciliadas con el SNS y/o presentación de facturas.
El Presupuesto de referencia ha sido preparado por Analistas de Costos de Dirección de Infraestructura y Equipos del SNS, tomando en cuenta los precios vigentes de los materiales
4
y con la mano de obra establecida por el Ministerio de Trabajo.
Tanto los gastos de seguros y fianzas, así como los estudios, diseños, gestiones, sometimientos y/o tramitaciones serán pagadas mediante desglose de partidas y/o presentación de
5
facturas, previamente aprobados por la Dirección de Infraestructura, teniendo como monto máximo el presentado en el presupuesto.
Las partidas contenidas en este presupuesto deben de contemplar, la presencia de un ingeniero o arquitecto residente, de igual manera la seguridad en obra (reglamento 522-06
6
seguridad y salud en obra )* Incluye Botas, Chalecos, arnés, cascos.
7 Todos los botes y partidas que ameriten, deben de considerar el acarreo interno de la obra.