LISTADO DE INSUMOS

TOTAL (sin
INSUMO UD ITBIS) ITBIS PU + ITBIS.
(RD$)

ACERO

Acero Ø 3/8" 1/2" , 1", 3/4" -G40 mts QQ 3,220.34 684.00 RD$3,800.00
Acero 1/2" , 1", 3/4" -G40 QQ 3,220.34 684.00 RD$3,800.00
acero ¼" x 20' - G40 QQ 1,250.00 265.50 1,475.00
Malla electrosoldada 2.7 x 2.7 10 x 10 ROLLO 13,135.59 2,790.00 RD$15,500.00
Malla Electrosoldada D2.3 15x15mm + 10% desp. ROLLO 13,135.59 2,790.00 RD$15,500.00
Malla Electrosoldada D2.3 15x15mm + 10% desp.
Malla electrosoldada 2.3 x 2.3 10 x 10 m2 108.18 22.98 127.65
Malla electrosoldada 2.5 x 2.5 10 x 10 m2 123.58 26.25 145.83
Malla electrosoldada 2.7 x 2.7 10 x 10 m2 128.54 27.30 151.68
Malla electrosoldada 2.3 x 2.3 15 x 15 m2 86.95 18.47 102.60

AGREGADOS

Bovedilla 0.15 x 0.40 x 2.08 ud 195.91 41.61 231.17


Bovedilla 0.15 x 0.40 x 2.35 ud 207.63 44.10 245.00
Bovedilla 0.15 x 0.40 x 3.55 ud 342.84 72.82 404.55
Bovedilla 0.15 x 0.40 x 4.80 ud 452.08 96.02 533.46
Bovedilla 0.15 x 0.40 x 5.20 ud 486.38 103.31 573.93
Bovedilla 0.20 x 0.40 x 7.38 ud 929.32 197.39 1,096.60
Bovedilla 0.50 x 0.66 x 0.15 ud 92.64 19.68 109.31
Bovedilla 0.50 x 0.66 x 0.20 ud 123.39 26.21 145.60
Bovedilla 0.50 x 0.66 x 0.25 ud 164.52 34.94 194.13
Foam de 1/2" ( 3m x 1.2 m) PLANCHA 153.79 32.66 181.47
Plancha e=4" foam 3.00mx1.20m UD 1,694.92 360.00 2,000.00

HORMIGON INDUSTRIAL

Hormigon 100 kg/m2 industrial (Inc. bombeo) m3 3,559.32 756.00 4,200.00


Hormigón 180 Kg/cm2 (incluye bomba y colocación) M3 5,807.27 1,233.47 6,852.58
Hormigón 210 Kg/cm2 (incluye bomba y colocación) M3 6,106.06 1,296.93 7,205.15
Hormigón 240 Kg/cm2 (incluye bomba y colocación) M3 6,525.43 1,386.00 7,700.00
Hormigón 280 Kg/cm2 (incluye bomba y colocación) M3 6,779.66 1,440.00 8,000.00
Hormigon 350 kg/m2 industrial (Inc. bombeo) m3 6,186.44 1,314.00 7,300.00

VARIOS

Arte e impresión en vilnil y colocación PA 22,457.62 4,770.00 RD$26,500.00


Estructura metálica todo costo PA 25,423.73 5,400.00 RD$30,000.00
Alambre #18 lbs 84.74 18.00 RD$100.00
clavos corrientes con cabeza 2" en adelante LBS 50.85 10.80 RD$60.00
clavos acero LBS 46.69 9.92 55.10
Clavos de Zinc LBS 101.69 21.60 RD$120.00
Clavo corriente, metalizado c/cabeza 2 1/2"x10 LB 26.95 5.72 RD$31.80
Clavo de zinc 2 1/2" + 5% desp. (.133 lb. / plancha) LB 41.64 8.85 RD$49.14
Hilo de nylon LBS 142.63 30.29 168.30
Hilo de gangorra U 143.22 30.42 RD$169.00
0.00 0.00
PALA "TRAMONTINA" UD 656.78 139.50 775.00
Pala cuadrada Tramontina UND 650.00 138.06 RD$767.00
Pala de corte Tramontina UND 650.00 138.06 RD$767.00
PICO "TRAMONTINA" CON MANGO UD 950.00 201.78 RD$1,121.00
Espatula UD 110.17 23.40 130.00
Cuchilla UD 148.31 31.50 175.00
Maseta Und 529.66 112.50 625.00
Cinsel Und 190.68 40.50 225.00
Martillo Und 203.39 43.20 240.00
Carretilla 3Pie Und 4,661.02 990.00 5,500.00
Carretilla Surtek 5.5P3 (6 meses uso) UND 7,500.00 1,593.00 RD$8,850.00
Cinta métrica U 1,398.31 297.00 RD$1,650.00
Herramientas( clavos de zinc, etc) Verja Delimitante En Zinc Y Mad PA 127.12 27.00 150.00
Juego bisagras UND 139.83 29.70 RD$165.00
Candado UND 250.00 53.10 RD$295.00
plywood 3/4" (dos caras) (4' x 8') PLANCHA 3,389.83 720.00 RD$4,000.00
plywood 3/4" (dos caras) (4' x 8') Mt2 571.72 121.43 674.63
madera pino americano bruta P2 105.93 22.50 RD$125.00
madera pino americano cepillada P2 94.16 20.00 111.11
Pino amer. 1"x 4"x12' bruto (4 pt) PT 44.30
Pino amer. 2"x 4"x12' bruto (8 pt) PT 54.28

cal (50 LBS) Fds RD$260.00


agua Gls 1.00
Zinc Calibre 34 (3 x 6) plcha 300.93 63.92 355.10
Zinc acanalado cal.29 UND 322.03 68.40 RD$380.00
Zinc acanalado, 3'x6', cal. 26 4 usos (14 / 4) UD RD$620.21

Espejos para baños M2 2,051.69 435.78 2,421.00


gasoil gls 187.80 39.89 221.60
angular 1 1/2 x 1 1/2 x 3/16 ml 126.47 26.86 149.24

Fibra para aumentar resistencia hormigon LBS 130.00 27.61 153.40


Extintor UD 4,661.02 990.00 5,500.00
Viga melatica tipo W 21 X 55 UD 36,355.93 7,722.00 42,900.00
Conectores stud para estructuras metalicas UD 93.30 19.82 110.09
sellador poliuretano para juntas horizontales UD 369.35 78.45 435.83
Planchuela de 4" x 3/16" UD 889.83 189.00 1,050.00
Tubo 4" x 4" x 3/16" UD 4,533.90 963.00 5,350.00
Estopa LBS 105.93 22.50 RD$125.00
Puerta (0.90 x 2.10 mts.) y Marco UD 4,629.63 983.33 5,462.96
Panel Polimetálico 0.70-1.00 x 2.10 UND 7,203.52
Llavín Stanley UND 1,616.17
puerta de evedoor Inc. Marco UD 7,203.52
cerradura TOLEDO doble puño C/llave y SEGURO UD 750.81
Bisagra UD 170.85
Ventana de aluminio completa P² 325.00

Herramienta de Trabajo a mano para replanteo PA 1,271.19 270.00 1,500.00


Escoba UD 12.71 2.70 15.00
Tubos galv 2-1/2-20 Ud 63.56 13.50 75.00
Tubos galv 1 -1/2-20 Ud 151.95 32.27 179.30
Reduccion de 2-1/2 a 1-1/2 Ud 788.14 167.40 930.00
Copa final Ud 18.64 3.96 22.00
Polea peq sencilla 1-1/2" Ud 5.08 1.08 6.00
Drisa blanca de 1/8 Ud 6.78 1.44 8.00
Letras de bronce de 6 UND 1,254.15 266.38 1,479.90
letras de Bronce de 8 UND 1,649.38 350.33 1,946.27
Figuritas UND 909.68 193.22 1,073.42
Tarja Acrilica UND 15,515.27 3,295.44 18,308.02
Suministro Banco UND 6,695.58 1,422.14 7,900.78
Meseta de granito con palometa incluida p² 444.92 94.50 525.00

Barra cuadrada 1/2" ud 519.20


Eléctrodo 6013 lb 65.04
Segueta ud 47.75
Disco de pulir ud 281.06

CEMENTO Y PEGAMENTOS

cemento gris Fds 406.78 86.40 RD$480.00


Cemento blanco (100 LBS) Fds 1,271.19 270.00 RD$1,500.00
Derretido blanco o a color FDS 673.76 143.11 795.03
Derretido para marmol FDS 1,144.92 243.18 1,351.00
Laticrete Sand beige 3.6 kg FDS 1,031.00 218.98 1,216.58
Pegamento de cerámica Pegatod FDS 442.37 93.96 RD$522.00

ACABADOS

Coralina natural m2 920.00 195.41 1,085.60


Marmol crema marfil 0.4 x 0.6 pulido m2 2,602.79 552.83 3,071.29
Piso Marmol travertino m2 2,400.00 509.76 2,832.00
Zocalo Marmol travertino ml 250.00 53.10 295.00
Pasa puertas Marmol m2 4,468.14 949.03 5,272.40
Gres porcelanico en baños y cocinas (acabado vertical) M2 677.97 144.00 800.00
Cerámica para espejo de agua M2 932.20 198.00 1,100.00
Revestimiento paredes Cerámica de Baños Cuarto Servicio M2 423.73 90.00 500.00
Cerámica cocina (0.20 x 0.20)Mts M2 626.12 132.99 738.83
Cerámica + 10% desperdicio M2 1,355.93 288.00 RD$1,600.00
0.00 0.00
Gres Porcelanico en área sociales apartamentos M2 677.97 144.00 800.00
Porcelanato Gres antideslizante en Cocinas y banos M2 838.97 178.20 989.99
Piso Ceramica en servicios, lavados, cocinas, balcones M2 423.73 90.00 500.00
Vibrazo M2 540.68 114.84 638.00
Porcelanato Chino M2 423.73 90.00 500.00
Piso de granito 40x40 fondo blanco M1 1,016.95 216.00 RD$1,200.00
Piso de granito negro M2 4,935.59 1,048.32 5,824.00
Piso de porcelanato de alto tránsito, antideslizante M2 1,694.92 360.00 2,000.00

Cenefa 0.10 x 0.25 ml 135.59 28.80 160.00


Cenefa 0.10 x 0.20 ml 162.71 34.56 192.00
Huella y contrahuella granito ml 1,800.33 382.39 2,124.39
Descanso Granito ml 3,440.68 730.80 4,060.00
zócalo granito fondo blanco-negro en escalones UD 169.49 36.00 200.00
Area de Descanso de granito fondo blanco m2 348.98 74.12 411.80
zocalos area de descanso granito fondo blanco ml 59.32 12.60 70.00
Bisel para escalones .05 x .45 UD 169.49 36.00 200.00
Separadores de cerámica FDA 241.53 51.30 RD$285.00

AGREGADOS

arena gruesa ITABO (de mina) m3 1,200.00


arena FINA (para pañete) m3 1,500.00
arena gruesa ITABO LAVADA (de PLANTA) m3 1,500.00
gravilla 3/4 @ 3/8" m3 1,500.00
Material granular Mt³ 650.00

BLOQUES DE MORMIGON

bloques de 0.10 mts (4") TAVARES INDUSTRIAL, C. x A. / AGUAYO UD 21.19 4.50 25.00
bloques de 0.15 mts (6") TAVARES INDUSTRIAL, C. x A. / AGUAYO Ud 37.29 7.92 44.00
bloques de 0.20 mts (8") TAVARES INDUSTRIAL, C. x A. / AGUAYO Ud 48.31 10.26 57.00
bloques de 0.25 mts (10") TAVARES INDUSTRIAL, C. x A. / AGUAYO Ud 76.27 16.20 90.00

PINTURA

Imprimador (primer) acrílico de alto desempeño GLS 550.85 117.00 RD$650.00


pintura hospitalaria antibacterial y antimicrobiana GLS 1,610.17 342.00 RD$1,900.00
pintura mongranite GLS 805.00 170.98 949.90
pintura acrílica (POPULAR) GLS 1,271.19 270.00 RD$1,500.00
pintura EXPOXICA (POPULAR) GLS 1,906.78 405.00 2,250.00
pintura Semigloss (POPULAR) GLS 885.59 188.10 1,045.00
pintura Esmalte (POPULAR) GLS 957.63 203.40 1,130.00
Pintura acrílica (SHERWIN WILLIANS) Premiun GLS 900.00 191.16 1,062.00
pintura primer de base GLS 762.71 162.00 900.00
pintura primer impermeabillizante de base GLS 592.00 125.74 698.56
Pintura anticorrosiva UD 466.10 99.00 550.00
pintura mantenimiento GLS 957.63 203.40 1,130.00
materiales DIVERSOS (LIJAS, másilla, piedra, ETC) m2 63.56 13.50 75.00
Thinner gl 353.11 75.00 416.67
Prime + 10% GL/MT² 1,165.25 247.50 1,375.00
Manto asfartico e= 4mm+10% MT² 425.31 90.34 501.87
Pintura de aluminio GL/MT² 932.20 198.00 1,100.00
másilla, lija y piedra en paredes m2 8.47 1.80 10.00
Pintura oxido rojo, aluminio etc P.A 762.71 162.00 900.00
Aguarra gl 555.87
Brocha 1 1/2" ud 101.15

INSUMOS ELECTRICOS
ALAMBRE DE GOMA #14/2 PL 14.75 3.13 17.40
ALAMBRE DE GOMA #14/3 PL 16.71 3.55 19.72
ALAMBRE DE GOMA #12/2 PL 18.19 3.86 21.46
ALAMBRE DE GOMA #12/3 PL 21.45 4.56 25.31
ALAMBRE DE GOMA #10/2 PL 28.44 6.04 33.56
ALAMBRE DE GOMA #10/3 PL 37.36 7.93 44.08
ALAMBRE DE GOMA #10/4 PL 58.00 12.32 68.44
ALAMBRE DE GOMA #8/2 PL 44.24 9.40 52.20
ALAMBRE DE GOMA #8/3 PL 73.73 15.66 87.00
ALAMBRE DE GOMA #8/4 PL 132.71 28.19 156.60
ALAMBRE DE GOMA #6/2 PL 51.12 10.86 60.32
ALAMBRE DE GOMA #6/3 PL 93.39 19.84 110.20
ALAMBRE DE GOMA #6/4 PL 147.46 31.32 174.00
ALAMBRE THW #14 PL 3.02 0.64 3.56
ALAMBRE THW #12 PL 11.97 2.54 14.12
ALAMBRE THW #10 PL 7.05 1.50 8.32
ALAMBRE THW #8 PL 38.50 8.18 45.43
ALAMBRE THW #6 PL 25.36 5.39 29.92
Alambre THHN # 2 (pot.) PL 77.29 16.42 91.20
Alambre THHN # 6 (neutro) PL 30.80 6.54 36.34
Alambre THHN # 8 (tierra) PL 19.56 4.15 23.08
TAPE 3M SCOTT +33 UD 353.11 75.00 416.67
TAPE 3M SCOTT +23 UD 476.78 101.27 562.60
CAJA OCTAGONAL DE 1/2" UD 102.06 21.68 120.43
CAJA OCTAGONAL DE 3/4" UD 102.06 21.68 120.43
TAPA OCTAGONAL 1/2 UD 17.69 3.76 20.88
TAPA OCTAGONAL 3/4 UD 17.69 3.76 20.88
TUERCA UF DE 1/2 UD 14.75 3.13 17.40
TUERCA UF DE 3/4 UD 14.75 3.13 17.40
CAJA RECTANGULAR DE 1/2" UD 102.06 21.68 120.43
CAJA RECTANGULAR DE 3/4" UD 102.06 21.68 120.43
TAPA PLASTICA 2 X 4 UD 4.92 1.04 5.80
TAPA DE METAL 2 X 4 UD 14.75 3.13 17.40
TAPA 2 X 4 MAMEY UD 49.15 10.44 58.00
REG. 4" X 4" X 2" AME. UD 65.86 13.99 77.72
REG. 5" X 5" X 2" AME UD 123.86 26.31 146.16
REG. 6 X 6 X 4 NIR UD 285.08 60.55 336.40
REG. 6" X 6" X 6" N3R UD 399.12 84.77 470.96
REG. 12" X 12" X 4" N1R UD 699.93 148.67 825.92
REG. 12" X 12" X 6" N1R UD 823.80 174.97 972.08
REG. 12" X 12" X 4" N3R UD 783.49 166.41 924.52
REG. 12" X 12" X 6" N3R UD 912.27 193.77 1,076.48
ROSETA PORCELANA LEVINTON UD 48.17 10.23 56.84
GLOBO DE 6" PLANO UD 471.86 100.22 556.80
TIMBRE COMPANA DE 10" UD 353.90 75.17 417.60
TIMBRE ZUMBADOR BTICINO UD 100.94 21.44 119.11
BOMBILLO BAJO CONSUMO 23W UD 172.03 36.54 203.00
LAMPARA 1T-T8/32W LISA UD 344.07 73.08 406.00
LAMPARA 2T-T8/32W LISA UD 1,081.36 229.68 1,276.00
LAMP. 2 X 2 3T-T8/32W PLAF. CON DIF.PARAB. UD 2,555.93 542.88 3,016.00
LAMP. 2 X 4 3T-T8/32W PLAF. CON DIF.PARAB. UD 3,047.46 647.28 3,596.00
LAMPARA SECADOR DE BAJO CONSUMO UD 1,254.37 266.43 1,480.16
Suministro de Lampara Tipo Cobra 150W UD 2,966.10 630.00 3,500.00
Lamp. Led 2´x 2´- Superf. UD 1,779.66 378.00 2,100.00
INT SEN. LEVINTON COMPLETO UD 24.58 5.22 29.00
TAPA PLASTICA INT.SENCILLO UD 4.92 1.04 5.80
TAPA METAL INT.SENCILLO UD 14.75 3.13 17.40
INT SEN. BTICINO UD 80.51 17.10 95.00
INT DOBLE. LEVINTON COMPLETO UD 211.31 44.88 249.35
TAPA PLASTICA INT.DOBLE UD 14.75 3.13 17.40
TAPA METAL INT.DOBLE UD 14.75 3.13 17.40
INT DOBLE BTICINO UD 103.22 21.92 121.80
INT TRIPLE BTICINO UD 167.12 35.50 197.20
INT. 3W LEVINTON UD 97.32 20.67 114.84
INT. 3W BTICINO UD 108.14 22.97 127.60
INT. 4W LEVINTON UD 325.39 69.11 383.96
INT. 4W BTICINO UD 368.64 78.30 435.00
PULSADOR TIMBRE BTICINO UD 226.10 48.02 266.80
TOMACORRIENTE 110Vac COMPL. LEVINTON UD 24.58 5.22 29.00
TAPA TOMACORRIENTE 110Vac PLASTICA UD 4.92 1.04 5.80
TAPA TOMACORRIENTE 110Vac METAL UD 14.75 3.13 17.40
TOMACORRIENTE 110Vac BTICINO UD 86.51 18.37 102.08
TOMACORRIENTE 220Vac COMPL. LEVINTON UD 54.07 11.48 63.80
TAPA TOMACORRIENTE 220Vac PLASTICO UD 5.90 1.25 6.96
TAPA TOMACORRIENTE 220Vac METAL UD 32.95 7.00 38.88
TOMACORRIENTE 220Vac. BTICINO UD 117.97 25.06 139.20
TAPE 3M SCOTT +33 UD 206.44 43.85 243.60
TAPE 3M SCOTT +23 UD 476.78 101.27 562.60
BARRA UNITRON DE 1/2" X 10' UD 516.10 109.62 609.00
BARRA UNITRON DE 5/8" X 10' UD 565.25 120.06 667.00
TARUGO AZUL C/TORNILLO UD 12.71 2.70 15.00
TORNILLO HEXAGONAL DE 1/4 X 1-1/2" UD 1.74 0.37 2.05
EXPANSION DE 1/4 X 1-1/2" UD 20.34 4.32 24.00
TORNILLO HEXAGONAL DE 3/8" X 1-1/2" UD 11.80 2.51 13.92
EXPANSION DE 3/8" X 2" UD 11.80 2.51 13.92
EXPANSION DE 3/8" X 1-1/2" UD 11.80 2.51 13.92
GANCHO DE 3/8" UD 11.80 2.51 13.92
ABANICO KDK DE TECHO B56 DE 56" UD 2,817.80 598.50 3,325.00
ABANICO KDK ORBITAL M40R DE 16" UD 4,449.15 945.00 5,250.00
ABANICO KDK DE PARED M40C UD 3,686.44 783.00 4,350.00
CONDULET DE 1/2" UD 513.97 109.17 606.48
EMT DE 1/2" X 10' UD 144.87 30.77 170.95
CURVA EMT DE 1/2" UD 37.57 7.98 44.33
COUPLING EMT DE 1/2" UD 7.93 1.68 9.36
CONECTOR RECTO EMT DE 1/2" UD 11.73 2.49 13.84
IMC DE 1/2" X 19' UD 422.71 89.78 498.80
CURVA IMC DE 1/2" UD 34.41 7.31 40.60
CONETOR HUB DE 1/2" UD 134.68 28.61 158.92
BX DE 1/2" UD 21.63 4.59 25.52
CONETOR RECTO BX 1/2" UD 11.80 2.51 13.92
CONECTOR CURVO BX DE 1/2" UD 31.46 6.68 37.12
LT DE 1/2" UD 29.49 6.26 34.80
CONETOR RECTO LT DE 1/2" UD 39.32 8.35 46.40
CONECTOR CURVO LT DE 1/2" UD 73.73 15.66 87.00
CONDUFLEX DE 1/2" UD 4.15 0.88 4.90
ABRAZADERA EMT DE 1/2" UD 2.53 0.54 2.98
ABRAZADERA UNITRON DE 1/2" UD 17.69 3.76 20.88
CONDULET DE 3/4" UD 81.59 17.33 96.28
TUB.EMT DE 3/4" X 10' UD 185.80 39.46 219.24
CURVA EMT DE 3/4" UD 43.25 9.19 51.04
COUPLING EMT DE 3/4" UD 12.78 2.71 15.08
CONECTOR RECTO EMT DE 3/4" UD 12.78 2.71 15.08
IMC DE 3/4" X 19' UD 484.64 102.94 571.88
CURVA IMC DE 3/4" UD 37.36 7.93 44.08
CONETOR HUB DE 3/4" UD 147.46 31.32 174.00
BX DE 3/4" UD 25.56 5.43 30.16
CONETOR RECTO BX 3/4" UD 14.75 3.13 17.40
CONECTOR CURVO BX DE 3/4" UD 34.41 7.31 40.60
LT DE 3/4" UD 42.27 8.98 49.88
CONETOR RECTO LT DE 3/4" UD 59.97 12.74 70.76
CONECTOR CURVO LT DE 3/4" UD 83.56 17.75 98.60
CONDUFLEX DE 3/4" UD 5.29 1.12 6.24
ABRAZADERA DE 3/4" UD 4.92 1.04 5.80
ABRAZADERA UNITRON DE 3/4" UD 14.75 3.13 17.40
CONDULET DE 1" UD 78.64 16.70 92.80
EMT DE 1" X 10' UD 297.86 63.27 351.48
CURVA EMT DE 1" UD 50.14 10.65 59.16
COUPLING EMT DE 1" UD 18.68 3.97 22.04
CONECTOR RECTO EMT DE 1" UD 18.68 3.97 22.04
IMC DE 1" X 19' UD 516.10 109.62 609.00
CURVA IMC DE 1" UD 129.76 27.56 153.12
CONETOR HUB DE 1" UD 257.56 54.71 303.92
BX DE 1" UD 40.31 8.56 47.56
CONETOR RECTO BX 1" UD 26.54 5.64 31.32
CONECTOR CURVO BX DE 1" UD 51.12 10.86 60.32
LT DE 1" UD 48.17 10.23 56.84
CONETOR RECTO LT DE 1" UD 68.81 14.62 81.20
CONECTOR CURVO LT DE 1" UD 122.88 26.10 145.00
CONDUFLEX DE 1" UD 8.85 1.88 10.44
ABRAZADERA DE 1" UD 4.92 1.04 5.80
ABRAZADERA UNITRON DE 1" UD 24.58 5.22 29.00
CONDULET DE 1-1/2" UD 78.64 16.70 92.80
EMT DE 1-1/2" X 10' UD 442.37 93.96 522.00
CURVA EMT DE 1-1/2" UD 115.02 24.43 135.72
COUPLING EMT DE 1-1/2" UD 47.19 10.02 55.68
CONECTOR RECTO EMT DE 1-1/2" UD 47.19 10.02 55.68
IMC DE 1-1/2" X 19' UD 968.31 205.67 1,142.60
CURVA IMC DE 1-1/2" UD 271.32 57.63 320.16
CONETOR HUB DE 1-1/2" UD 218.24 46.35 257.52
BX DE 1-1/2" UD 64.88 13.78 76.56
CONETOR RECTO BX 1-1/2" UD 86.51 18.37 102.08
CONECTOR CURVO BX DE 1-1/2" UD 166.14 35.29 196.04
LT DE 1-1/2" UD 110.10 23.39 129.92
CONETOR RECTO LT DE 1-1/2" UD 219.22 46.56 258.68
CONECTOR CURVO LT DE 1-1/2" UD 285.08 60.55 336.40
CONDUFLEX DE 1-1/2" UD 21.63 4.59 25.52
ABRAZADERA DE 1-1/2" UD 7.86 1.67 9.28
ABRAZADERA UNITRON DE 1-1/2" UD 23.59 5.01 27.84
CONDULET DE 2" UD 185.80 39.46 219.24
EMT DE 2" X 10' UD 605.56 128.62 714.56
CURVA EMT DE 2" UD 174.98 37.17 206.48
COUPLING EMT DE 2" UD 58.98 12.53 69.60
CONECTOR RECTO EMT DE 2" UD 58.98 12.53 69.60
IMC DE 2" X 19' UD 1,438.20 305.47 1,697.08
CURVA IMC DE 2" UD 339.15 72.04 400.20
CONETOR HUB DE 2" UD 318.51 67.65 375.84
BX DE 2" UD 61.93 13.15 73.08
CONETOR RECTO BX 2" UD 93.39 19.84 110.20
CONECTOR CURVO BX DE 2" UD 406.98 86.44 480.24
LT DE 2" UD 131.73 27.98 155.44
CONETOR RECTO LT DE 2" UD 172.03 36.54 203.00
CONECTOR CURVO LT DE 2" UD 398.14 84.56 469.80
CONDUFLEX DE 2" UD 63.90 13.57 75.40
ABRAZADERA DE 2" UD 14.55 3.09 17.17
ABRAZADERA UNITRON DE 2" UD 37.36 7.93 44.08
BARRA UNITRON DE 1/2" X 10' UD 516.10 109.62 609.00
BARRA UNITRON DE 5/8" X 10' UD 565.25 120.06 667.00
CONDULET DE 3" UD 1,368.41 290.65 1,614.72
EMT DE 3" X 10' UD 1,321.22 280.63 1,559.04
CURVA EMT DE 3" UD 1,164.92 247.43 1,374.60
COUPLING EMT DE 3" UD 248.71 52.83 293.48
CONECTOR RECTO EMT DE 3" UD 248.71 52.83 293.48
IMC DE 3" X 19' UD 3,656.95 776.74 4,315.20
CURVA IMC DE 3" UD 1,336.95 283.97 1,577.60
CONETOR HUB DE 3" UD 1,053.83 223.83 1,243.52
BX DE 3" UD 1,339.90 284.59 1,581.08
CONETOR RECTO BX 3" UD 543.63 115.47 641.48
CONECTOR CURVO BX DE 3" UD 1,803.90 383.15 2,128.60
LT DE 3" UD 382.41 81.22 451.24
CONETOR RECTO LT DE 3" UD 983.05 208.80 1,160.00
CONECTOR CURVO LT DE 3" UD 1,636.78 347.65 1,931.40
CONDUFLEX DE 3" UD 231.02 49.07 272.60
ABRAZADERA DE 3" UD 44.24 9.40 52.20
ABRAZADERA UNITRON DE 3" UD 63.90 13.57 75.40
CONDULET DE 4" UD 1,857.97 394.63 2,192.40
EMT DE 4" X 10' UD 294.92 62.64 348.00
CURVA EMT DE 4" UD 1,420.51 301.72 1,676.20
COUPLING EMT DE 4" UD 211.36 44.89 249.40
CONECTOR RECTO EMT DE 4" UD 12.78 2.71 15.08
IMC DE 4" X 19' UD 4,118.98 874.87 4,860.40
CURVA IMC DE 4" UD 2,404.54 510.72 2,837.36
CONETOR HUB DE 4" UD 1,256.34 266.85 1,482.48
BX DE 4" UD 294.92 62.64 348.00
CONETOR RECTO BX DE 4" UD 1,297.63 275.62 1,531.20
CONECTOR CURVO BX DE 4" UD 2,505.80 532.23 2,956.84
LT DE 4" UD 609.49 129.46 719.20
CONETOR RECTO LT DE 4" UD 1,370.37 291.07 1,617.04
CONECTOR CURVO LT DE 4" UD 2,486.14 528.06 2,933.64
ABRAZADERA DE 4" UD 86.51 18.37 102.08
ABRAZADERA UNITRON DE 4" UD 86.51 18.37 102.08
Breaker G.E 20/1 THQP UD 146.69 31.16 173.09
Breaker G.E 30/2 THQL UD 364.61 77.44 430.24
Breaker G.E 40/2 THQL UD 414.67 88.08 489.31
Breaker G.E 60/2 THQL UD 538.76 114.43 635.74
Breaker G.E 40/1 THQL UD 166.55 35.38 196.53
A/A Aire Acondicionado De 24BTU Und 44,067.80 9,360.00 52,000.00
A/A Aire Acondicionado De 12BTU Und 24,152.54 5,130.00 28,500.00
Extractor Und 5,762.71 1,224.00 6,800.00
Abanico KDK (Techo) 56" UD 3,898.31 828.00 4,600.00
A/A Aire Acondicionado De 12BTU Und 24,152.54 5,130.00 28,500.00
Salida Control Para Abanico Techo accesorios electricos Und 1,059.32 225.00 1,250.00
Conectores PVC de 1/2" UD 10.17 2.16 12.00
Tuercas conduit de 1/2" UD 0.95 0.20 1.12
Mensajero electrico (soga, nylon) PL 1.17 0.25 1.38
Materiales menores (tornillos, etc) P.A. 13.14 2.79 15.50
Abrazadera 3" EMT UND 54.36 11.55 64.14
Curva plastica 1/2" PL 4.49 0.95 5.30

INSUMOS SANITARIOS

tubo 12" PVC SDR-41 UD 11,275.71 2,394.96 13,305.34


tubo 8" PVC SDR-41 UD 5,153.79 1,094.67 6,081.47
tubo 8" PVC SDR-41 ML 889.71 188.97 1,049.85
tubo 6" PVC SDR-41 UD 3,053.12 648.48 3,602.68
tubo 6" PVC SDR-41 ML 527.06 111.95 621.94
tubo 3" PVC SDR-41 UD 534.55 113.54 630.77
tubo 3" PVC SDR-41 ML 92.28 19.60 108.89
tubo 4" PVC SDR-41 UD 1,326.59 281.77 1,565.38
tubo 4" PVC SDR-41 ML 229.01 48.64 270.23
PIE 69.82 14.83 82.39
tubo 2" PVC SDR-41 UD 339.58 72.13 400.71
tubo 1/2" PVC Sch-40 UD 444.92 94.50 RD$525.00
tubo 1/2" PVC Sch-40 ML 76.81 16.31 90.63
tubo 3/4" PVC Sch-40 UD 618.64 131.40 RD$730.00
tubo 3/4" PVC Sch-40 ML 106.80 22.68 126.02
tubo 1" PVC Sch-40 UD 889.83 189.00 RD$1,050.00
tubo 1" PVC Sch-40 ML 153.61 32.63 181.26
tubo 1 1/2" PVC Sch-40 UD 1,474.58 313.20 RD$1,740.00
tubo 1 1/2" PVC Sch-40 ML 254.56 54.07 300.38
tubo 2" PVC Sch-40 UD 1,991.53 423.00 RD$2,350.00
tubo 2" PVC Sch-40 ML 343.80 73.02 405.68
tubo 3" PVC Sch-40 UD 1,615.80 343.20 RD$1,906.64
tubo 3" PVC Sch-40 ML 278.94 59.25 329.15

tubo 1/2" PVC SDR-26 UD 96.52 20.50 113.89


tubo 1/2" PVC SDR-26 pl 16.36 3.47 19.30
tubo 2" PVC SDR-26 UD 355.78 75.57 419.82
tubo 3" PVC SDR-26 UD 766.79 162.87 904.81
tubo 4" PVC SDR-26 UD 1,291.58 274.33 1,524.06
tubo 6" PVC SDR-26 UD 2,669.07 566.91 3,149.50
tubo 8" PVC SDR-26 UD 4,522.54 960.59 5,336.60
tubo 8" PVC SDR-26 PL 766.53 162.81 904.51
tubo 12" PVC SDR-26 UD 9,904.92 2,103.81 11,687.81
Adaptador hembra PVC presión 3/4" UD 4.42 0.94 5.22
Reducción PVC presión 3/4" x ½" UD 1.57 0.33 1.85
reducción PVC drenaje 2" A 1½" UD 10.52 2.23 12.41
arandela sanitaria PVC de 4" X 4" UD 83.93 17.83 99.04
sifón drenaje 1½" para lavamanos UD 162.96 34.61 192.29
sifón doble de 1½" P/fregadero UD 103.28 21.94 121.88
sifón drenaje 2" UD 74.36 15.79 87.74
sifón drenaje 4" UD 84.79 18.01 100.05
codo PVC drenaje 8" x 90° UD 272.54 57.89 321.60
codo PVC drenaje 6" x 90° UD 227.12 48.24 268.00
codo PVC drenaje 4" x 90° UD 109.57 23.27 129.29
codo PVC drenaje 3" x 90° UD 38.34 8.14 45.24
codo PVC drenaje 2" x 90° UD 12.58 2.67 14.84
Tapon Registro 2" UD 25.56 5.43 30.16
tee PVC drenaje 4" UD 215.23 45.71 253.97
tee PVC drenaje 3" UD 52.10 11.07 61.48
tee PVC drenaje 2" UD 19.17 4.07 22.62
Curva 2"de drenaje UD 7.96 1.69 9.39
Curva 4" de drenaje UD 38.24 8.12 45.12
yee PVC drenaje 2 " x 2" UD 19.17 4.07 22.62
yee PVC drenaje 4 " x 4" UD 89.46 19.00 105.56
yee PVC drenaje 4 " x 2" UD 67.08 14.25 79.16
yee PVC drenaje 8 " x 4" UD 533.02 113.21 628.96
yee PVC drenaje 6 " x 6" UD 418.78 88.95 494.16
yee PVC drenaje 6 " x 8" UD 473.69 100.61 558.96
yee PVC drenaje 6 " x 4" UD 448.27 95.21 528.96
yee-tee PVC drenaje 6" UD 361.02 76.68 426.00
yee-tee PVC drenaje 8" UD 433.22 92.02 511.20
Tuberia Polipropileno 1/2'' AC PN20 (4m) 20 mm UD 122.30 25.98 144.31
Tuberia Polipropileno 1/2'' AF PN16 (4m) 20 mm UD 104.25 22.14 123.02
Tuberia Polipropileno 3/4'' AC (4m) PN20 (4m) 25 mm UD 190.95 40.56 225.32
Tuberia Polipropileno 3/4'' AF PN16 (4m) 25 mm UD 167.20 35.51 197.30
Tuberia Polipropileno 1'' AC PN20 (4m) 32 mm UD 304.86 64.75 359.73
Tuberia Polipropileno 1'' AF PN16 (4m) 32 mm UD 265.00 56.29 312.70
Tuberia Polipropileno 1 1/2'' AF y AC (4m) UD 760.00 161.42 896.80
Tuberia Polipropileno 2'' AF PN16 (4m) 63 mm UD 1,087.40 230.96 1,283.13
Tuberia Polipropileno 3'' (4m) 90mm UD 2,271.00 482.36 2,679.78
Tuberia Polipropileno 4'' AC PN20 (4m) 110 UD 3,538.51 751.58 4,175.44
Tuberia Polipropileno 4'' Af PN16 (4m) 110 UD 3,036.03 644.85 3,582.52
Tuberia Hierro Negro 3'' UD 3,328.81 707.04 3,928.00
Tuberia Hierro Negro 4'' UD 4,836.44 1,027.26 5,707.00
Tuberia Hierro 2'' UD 1,900.85 403.74 2,243.00
Codo de 2 "HG UD 105.93 22.50 125.00
codo HN 3"x 90'' UD 254.24 54.00 300.00
Codo de 4 "HG UD 379.66 80.64 448.00
Tee 3 x 2 "HG UD 230.51 48.96 272.00
Tee 4 x 3 "HG UD 593.22 126.00 700.00
0.00 0.00
Manguera flexible lavamanos inox. 3/8" Eastman UND 194.92 41.40 230.00
0.00 0.00
mezcladora Monomando para fregadero UD 1,592.54 338.26 1,879.20
mezcladora para lavamano cuarto servicio UD 550.85 117.00 650.00
mezcladora Monomando para Lavamanos UD 1,663.77 353.39 1,963.25
mezcladora para Banera monomando UD 2,966.10 630.00 3,500.00
mezcladora S/manguera y S/BOQ. P/FREG. Tipo Sayco UD 1,138.37 241.79 1,343.28
mezcladora 3 puños p/ducha Tipo sayco UD 1,652.54 351.00 1,950.00
ducha con regadera completa UD 296.61 63.00 350.00
Lavamanos Lorentina Sadosa Blanco C/Pedestal UD 2,457.63 522.00 2,900.00
Lavamanos Toto Ovalado para Empotrar UD 2,617.40 555.94 3,088.53
Lavamanos Embajador de empotrar A color UD 1,867.31 396.62 2,203.42
Lavamanos ovalado UD 1,867.31 396.62 2,203.42
lavamanos de porcelana sanitaria antibacterial UD 3,156.78 670.50 RD$3,725.00

fregadero doble acero INOx. S/ACCS. NI MEZCL. UD 2,415.25 513.00 2,850.00


Fregadero de acero inoxidable de una cámaras y escurridor incl.
Mezcladora UD 2,618.64 556.20 3,090.00
fregadero doble acero INOx. S/ACCS. NI MEZCL. UD 3,932.20 835.20 4,640.00
Fregadero de esquina de acero inoxidable de dos cámaras UD 9,237.29 1,962.00 10,900.00
tapa inodoro royal A color UD 426.64 90.62 503.44
Mueble de madera color negro 60x46 cms con lavamano de porcelana y
espejo con madera UD 12,992.00 2,759.50 15,330.56
Mueble de madera color negro 50x25 cms con lavamano de porcelana y
espejo con madera UD 9,408.00 1,998.26 11,101.44
Mueble de madera color negro 60x46 cms con lavamano de porcelana y
espejo con madera UD 11,200.00 2,378.88 13,216.00
Inodoro de una pieza Vissani con tapa caida lenta UD 8,064.00 1,712.79 9,515.52
Inodoro Marca Water Wave con tapa de caida lenta y doble descarga en
servicios UD 3,808.00 808.82 4,493.44
0.00 0.00
Inodoro Bath Collection Bco. con tapa UND 8,385.59 1,781.10 RD$9,895.00
Inodoros UD 7,597.81 1,613.77 8,965.42
Orinal UD 4,045.51 859.27 4,773.70
Lavamano de porcelana linea Vissani 42x40x26 cms UD 2,912.00 618.51 3,436.16
Lavamano de porcelana linea Vissani 42x42 cms UD 2,912.00 618.51 3,436.16
Lavamano de porcelana 40x25x14 cms UD 1,120.00 237.89 1,321.60
Mezcladora para Lavamano de la linea Vissani UD 2,912.00 618.51 3,436.16
Mezcladora para Lavamano de la linea Water Ware UD 2,016.00 428.20 2,378.88
Mezcladora para Lavamano de la linea Water Ware UD 1,568.00 333.04 1,850.24
Mezcladora de ducha, con ducha de mano, holder y manguera de la linea
Vissani UD 5,152.00 1,094.28 6,079.36
Mezcladora de ducha, con ducha de mano, holder y manguera de la linea
Water Ware UD 2,688.00 570.93 3,171.84
Mezcladora de ducha, con ducha de mano, holder y manguera de la linea
Water Ware UD 2,016.00 428.20 2,378.88
llave de empotrar ½" (AMERICANA) para ducha UD 294.92 62.64 348.00
Plato de ducha (1.20 x 0.80) UD 3,051.83 648.21 3,601.16
mezcladora para fregadero marca water ware UD 4,480.00 951.55 5,286.40
Inodoro Sadosa Taino UD 2,838.98 603.00 3,350.00
Lavamano Sadosa Taino UD 775.00 164.61 914.50
Inodoro Sadosa Standard UD 5,084.75 1,080.00 6,000.00
inodoro Toto soiree de una Pieza Blanco elongado UD 27,759.72 5,896.17 32,756.47
inodoro Toto Carouso Elongado de 2 piezas UD 10,282.52 2,184.01 12,133.37
Bañera UD 5,267.80 1,118.88 6,216.00
Juegos de accesorios 3 piezas marca visani UD 2,912.00 618.51 3,436.16
Juego de accesorios para baños principales UD 2,966.10 630.00 3,500.00
Juegos de accesorios para baños servicios UD 508.47 108.00 600.00
Lavamanos sencillo blanco UD 720.34 153.00 850.00
Inodoro simplex blco UD 2,966.10 630.00 3,500.00
Desague de Plato de ducha (1.20 x 0.80) UD 407.63 86.58 481.00
Jacuzzi interior (1.82 x 1.00) UD 169,491.53 36,000.00 200,000.00
Botiquin Blanco de 2 Puertas UD 1,720.34 365.40 2,030.00
jabonera niquelada de superficie UD 207.63 44.10 245.00
Lavadero doble de granito fondo blanco UD 2,881.36 612.00 3,400.00
Lavadero Sencillo granito fondo blanco UD 1,525.42 324.00 1,800.00
Mueble de lavado en material hidrofugo,lavadero en fibra plastica de
una boca y 5" de espesor UD 3,220.34 684.00 3,800.00
llave de paso de bola de 3/4" europea UD 165.25 35.10 195.00
llave de paso de bola de 1/2" europea UD 101.69 21.60 120.00
llave de paso de bola de 11/4" UD 381.36 81.00 450.00
llave de paso de bola de 2" europea UD 1,488.98 316.26 1,757.00
llave de paso de 1/2" ppr UD 270.00 57.35 318.60
llave de paso de 2" ppr (union 63) UD 1,545.00 328.16 1,823.10
llave de paso de bola de 1/2" europea UD 313.59 66.61 370.04
llave de paso ppr de 3/4" europea UD 314.97 66.90 371.66
llave de paso de bola de 3/4" europea UD 286.44 60.84 338.00
llave de paso pprde 1" europea UD 519.95 110.44 613.54
llave de paso pprde 11/2" europea UD 619.95 131.68 731.54
llave de paso de bola de 1" europea UD 594.78 126.33 701.83
llave de paso de bola de 11/2" europea UD 762.71 162.00 900.00
llave de paso de 3" ppr UD 1,645.00 349.40 1,941.10
llave de paso de bola de 3" europea UD 6,655.25 1,413.58 7,853.20
Cemento de PVC ABRO Gls 1,524.58 323.82 1,799.00
niple niquelado 3/8" x 2½" UD 38.14 8.10 RD$45.00
reducción bushing de ½" A 3/8" HG. UD 25.14 5.34 29.66
cubrefalta niquelado de 3/8" UD 15.25 3.24 18.00
junta de CERA UD 84.40 17.93 99.59
llave ANGULAR de 3/8" UD 207.51 44.07 244.86
tubo flexible plástico para inodoro UD 108.11 22.96 127.57
tubo flexible plástico para lavamanos UD 108.11 22.96 127.57
tornillos para inodoros UD 36.30 7.71 42.83
boquilla para lavamanos UD 593.22 126.00 RD$700.00
boquilla para fregadero UD 42.37 9.00 50.00
boquilla para lavadero UD 152.47 32.39 179.92
tarugos plásticoS 3/8" UD 2.15 0.46 2.54
tornillo 3" x 14 UD 3.52 0.75 4.15
tornillo 1½" x 12 UD 2.79 0.59 3.30
rejilla roscada de 2" HG para piso UD 59.32 12.60 70.00
rejilla roscada de 4" HG para piso UD 43.86 9.32 51.75
Calentador de agua de gas 30 glones UD 23,784.41 5,051.81 28,065.60
Calentador de 30 gls ud 17,591.00 3,736.33 20,757.38
Extintor UD 4,661.02 990.00 5,500.00
Teflon 3/4'' UD 19.44 4.13 22.94
Gabinete contra incendios UD 18,644.07 3,960.00 22,000.00
cubrefalta de pvc ml 245.17 52.07 289.30
COLECTOR UD 205.34 43.61 242.30
Espejos para baños M2 2,051.69 435.78 2,421.00
Registro prefabricado 0.40 x0.40 UD 2,020.17 429.08 2,383.80
Tapa Solarium 0.40 x0.40 UD 3,215.56 682.98 3,794.36
Tapa hidraulica antiolor 50 cms x 50 cms PARA Trampa de grasa UD 15,254.24 3,240.00 18,000.00
Tapa de hidraulica D-16 de 50 cms x 50 cms PARA Registro de
inspeccion UD 12,711.86 2,700.00 15,000.00
Tapa articulada antiolor de diametro 0.60 m PARA Registro de
inspeccion UD 12,711.86 2,700.00 15,000.00
llave de chorro cromada 1/2" para lavadora UD 128.81 27.36 152.00
llave de chorro de ½" UD 105.93 22.50 125.00
llave chorro 3/4" UD 586.99 124.68 692.64
Tubo de Silicon industrial trasnp. 10.3 UD 381.36 81.00 450.00
Cemento PVC OATEY 32oz UND 752.91 159.92 888.43
Cemento PVC OATEY 16oz UND 441.06 93.68 520.45
Cemento PVC OATEY 8oz UND 262.85 55.83 310.17
Cemento PVC OATEY 4oz UND 173.75 36.91 205.03
0.00 0.00
Codo PVC drenaje 4" x 90° UND 109.57 23.27 129.29
Tee PVC drenaje 4" UND 215.23 45.71 253.97
Cemento PVC UND 752.91 159.92 888.43
Tarugo azul con tornillo UND 1.96 0.42 2.31
Abrazadera 3" EMT UND 54.36 11.55 64.14
Tinaco 500.00gls ud 9,202.41 1,954.59 10,858.85
Tuberías y Piezas P.V.C. Presión P.A. 450.00 95.58 531.00
0.00 0.00
Tuberia y piezas Llave de chorro PA 211.86 45.00 250.00
Tuberia y Piezas Vertedero p/baños (revestido de
ceramica) PA 423.73 90.00 500.00
Perforación a percución e instalación de tuberías pl 1,016.95 216.00 1,200.00
0.00 0.00
Piezas especiales Tuberias de 4" PVC ( drenaje ) todo incluido ud 1,016.95 216.00 1,200.00

Salida Agua Potable 1/2" Poliestileno 18mm UND RD$1,716.51


Salida Sanitaria A.N. 4" Inodoro Aérea UND RD$2,187.15
TARIFA DE ALBANILERIA

TARIFA
RESOLUCION
UD POR
11/2013
HORA
Trabajador no calificado (TNC) Día RD$823.75 102.97
Trabajador calificado (TC) Día RD$901.25 112.66
Ayudante de albañilería (Ay) Día RD$1,058.75 132.34
Albañil de tercera categoría (AT) Día RD$1,313.75 164.22
Albañil de segunda categoría (AS) Día RD$1,568.75 196.09
Albañil de primera categoría (AP) Día RD$1,964.25 245.53
Maestro de albañilería (MA) Día RD$2,471.25 308.91

Composición de brigadas:

AS 1,568.75
TC 901.25
TNC 823.75
2,470.00

AP 1,964.25
AY 1,058.75
TC 901.25
TNC 823.75
4,748.00

AS 1,568.75
AT 1,313.75
AY 1,058.75
TC 901.25
4,842.50

AS 1,568.75
AY 1,058.75
2,627.50

AS 1,568.75
AY 1,058.75
TC 901.25
3,528.75

AS 1,568.75
AY 1,058.75
TC 901.25
TNC 823.75
4,352.50

AP 1,964.25
AT 1,313.75
AY 1,058.75
TC 901.25
5,238.00

AP 1,964.25
AY 1,058.75
3,023.00

AP 1,964.25
AY 1,058.75
AY 1,058.75
4,081.75

AP 1,964.25
TC 901.25
2,865.50
AP 1,964.25
AY 1,058.75
TC 901.25
3,924.25

AS 1,568.75
TC 901.25
2,470.00

AY 1,058.75
TC 901.25
1,960.00

AS 1,568.75
TNC 823.75
2,392.50

AP 1,964.25
TC 901.25
TNC 823.75
3,689.25

MA 2,471.25
AY 1,058.75
TC 901.25
4,431.25

MA 2,471.25
AY 1,058.75
AY 1,058.75
TC 901.25
5,490.00

AP 1,964.25
AY 1,058.75
AY 1,058.75
4,081.75

MA 2,471.25
AY 1,058.75
2,471.25

MUROS DE BLOQUES

Rendimiento

Bloque de 4x8x16 pulgs (1AS 1AY 1TC)                              Unid. 125.00 28.23


Bloque de 6x8x16 pulgs.          (1AS 1AY 1TC)                                          Unid. 150.00 23.53
Bloque de 8x8x16 pulgs.              (1AS 1 AY 1TC)                                 Unid. 135.00 26.14
Bloque de 10-12x8x16 pulgs.     (1AS 1AY 1TC 1TNC)                                                        Unid. 90.00 48.36
Bloque ornamental de 5x25x20 pulg. 1AP 1AY Unid 75.00 40.31
Bloque irregular                                    1AP 1AY               Unid. 57.00 53.04
Bloque de cristal. 1AP 1TC Unid. 20.00 143.28
Block ornamental de barro o cemento. (calados) 1AP 1TC Unid. 55.00 52.10

Por violinar juntas de blocks horizontales y verticales una cara, con una regla adicional c/u. 1AS 1TC Unid. 785.00 3.15

Llenado de huecos de bloques, bastones a 0.80 M 1AS 1TC Unid 1,175.00 2.10
Llenado de huecos de bloques, bastones a 0.60 M 1AS 1TC Unid 785.00 3.15
Llenado de huecos de bloques, bastones a 0.40 M. 1AS 1TC Unid 585.00 4.22
Llenado de huecos de bloques, Bastones a 0.20M. 1AS 1TC Unid 315.00 7.84
Corte y amarre de varillas en bloques, Bastones a 0.80 m. 1AS 1TC Unid 2,350.00 1.05
Corte y amarre de varillas en bloques, bastones a 0.60 M. 1AS 1TC Unid 1,565.00 1.58
 Corte y amarre de varillas en bloques, bastones a 0.40 M. 1AS 1TC Unid 1,175.00 2.10
Corte y amarre de varillas en bloques, Bastones a 0.20 M. 1AS 1TC Unid 785.00 3.15

TERMINACION DE SUPERFICIE
Rendimiento

Fraguache con escoba        .1AY 1TC M2 69.00 28.41


Careteo con llana. 1AS 1TC M2 55.00 44.91
Resane con goma 1AS 1AY 1TC M2 52.00 67.86
Resane frotado.                   1AS 1TC M2 58.00 42.59
Repello maestriado en paredes. 1AS 1TC M2 22.00 112.27
Repello maestriado en techo de 2cms., mínimo espesor.  1AP 1AY M2 16.00 188.94
Repello sin maestriar.         1AS 1TC M2 46.00 53.70
Pañete rateado horizontal y vertical punta llana. 1AS 1AY 1TC M2 42.00 84.02

Pañete en muros interiores, en paredes maestriado y a plomo.  1AP 1AT 1AY 1TC                                 M2 28.00 187.07

Pañete en exterior, maestriado y a plomo. 1AP 1AT1AY 1TC M2 22.00 238.09


Pañete en techo y vigas. 1AS 1AT 1AY 1TC M2 20.00 242.13
Pañete en columna aisladas desde 0.20 en adelante. 1AP 1AT 1AY 1TC M2 15.00 349.20
Pañete en techo, maestriado a nivel 2cms mínimo .                      1AP 1AY 1TC         M2 14.50 270.64
Pañete pulido a color.         1AP 1AY 1TC M2 17.00 230.84
Pañete pulido sin color. 1AP 1AY 1TC     M2 19.00 206.54
 Pañete rasgado.                  1AP 1AY 1TC M2 12.00 327.02
Pañete en HI – Rib. 3 capas.             1AP 1AY 1TC M2 10.00 392.43
Natilla.                                  1AP 1TC                 M2 26.00 110.21
Marmolina con piedras.              1AP 1AY 1TC       M2 8.00 490.53
Marmolina frotada. 1AP 1AY 1TC     M2 10.00 392.43
Perrilla 1AP 1AY 1TC M2 10.00 392.43
Terminación de ½ pto. Arcos hasta 40cms. De ancho incluyendo 2 caras, fondo y cantos
M.L. 3.00 1,308.08
1AP 1AY 1TC
Cantos en vigas, columnas, antepechos y mochetas              1AS 1TC M.L. 30.00 82.33
Estrías.                                   1AS 1TC M.L. 15.00 164.67
Goteros colgantes. 1AS 1TC M.L. 13.00 190.00
Goteros en ranura.                               1AS 1TC M.L. 15.00 164.67
Cornisas hasta 12cms. En cemento. 1AP 1AY 1TC      M.L. 9.00 436.03
Panete Rústico 1AP 1TC M2 10.00 286.55
Lágrimas en cemento         1AP 1TC M2 8.00 358.19
Vuelo aislado de 0.80 mts. hasta 2 m.l. 1AS 1TC M.L. 7.10 347.89
Alto relieve incluyendo cantos.                      1AS 1TC M.L. 7.50 329.33

TERMINACION DE TECHO

Rendimiento

Zabaletas en techos              1AS 1AY                              M.L. 30.00 87.58


Zabaletas en pisos               1AS 1AY M.L. 45.00 58.39
Fino en techo horizontal sin incluir subida de materiales 1AS 1AY M2 16.00 164.22
Fino en techo inclinado sin incluir subida de materiales             1AS 1AY     M2 20.00 131.38
Fino en techo bermuda incl. cantos, sin incluir subida de materiales           1AP 1AT 1AY 1TC M2 13.00 402.92

COLOCACION DE PISOS Y DE ZOCALOS

Rendimiento

Piso rejonado sin pulir. 1AS 1AY 1TC 1TNC M2 28.00 155.45
Piso rejonado y pulido.       1AS 1AY 1TC 1TNC M2 24.00 181.35
Piso rejonado, pulido y marcado a hilo, incluyendo color 1AS 1AY 1TC 1TNC M2 18.00 241.81
Piso de hormigón frotado con espesor de 10cms. 1AS 1AY 1TC 1TNC M2 24.00 181.35
Piso de hormigón frotado y marcado a violín, con espesor de 10 cms. 1AS 1AY 1TC 1TNC M2 18.00 241.81
Piso de hormigón pulido marcado a violín, con espesor de 0.10 mts. 1AS 1AY 1TC 1TNC M2 17.00 256.03
Piso de cemento pulido (fino solo)   1AS 1TC M2 22.00 112.27
Piso de losetas de mármol de fabricación nacional incluyendo base y nivel. 1AP 1AY M2 4.40 687.05
Piso de losetas de mármol importado incluyendo base y nivel. 1AP 1AY M2 3.80 795.53
Piso de mosaicos en cartabón. 1AP 1AY 1TC M2 11.00 356.75
Piso de mosaicos en plumilla            1AP 1AY 1TC M2 11.00 356.75
Piso de mosaicos 20x20 cms. y 25x25 cms. tipo corriente.               1AP 1AY 1TC M2 15.00 261.62
Piso de mosaicos de granito de 25x25 cms. 1AP 1AY 1TC M2 14.00 280.30
Piso de mosaicos de granito de 30x30 cms. 1AP 1AY 1TC M2 13.00 301.87
Piso de mosaicos de granito 33x33cms. 1AP 1AY 1TC M2 13.00 301.87
Piso de mosaicos de granito de 40x40cms. 1AP 1AY 1TC M2 11.00 356.75
Piso de mosaicos de granito 50x50cms. 1AP 1AY 1TC M2 10.50 373.74
Piso de mosaicos de granito en plumilla o cartabón. 1AP 1AY 1TC M2 10.50 373.74
Piso de mosaico de gravilla de 20x20cms. 1AP 1AY 1TC M2 15.00 261.62
Piso de mosaicos de gravilla de 25x25cms. 1AP 1AY 1TC M2 15.00 261.62
Piso de mosaicos de gravilla de 30x30cms. 1AP 1AY 1TC M2 14.00 280.30
Piso de mosaicos de gravilla de 40x40cms. 1AP 1AY 1TC M2 13.00 301.87
Piso de mosaicos de gravilla de 50x50cms. 1AP 1AY 1TC M2 11.00 356.75
Colocacion de vibrazo 1AP 1AY 1TC M2 11.50 341.24
Colocación de adoquines 1AP 1AY 1TC M2 14.00 280.30
Colocación tabletas de hormigón 0.20 x 0.40 m 1AP 1AY 1TC M2 11.80 332.56
Piso de losetas de cerámica de fabricación nacional de 15x15 hasta 20x20cms., sin incluir base y
nivel. 1AP 1TC M2 6.00 477.58

Piso de losetas de cerámica de fabricación nacional de 15x15 hasta 20x20cms., incluyendo base y
nivel. 1AP 1TC M2 5.00 573.10

Piso de losetas de cerámica importada de 15x15 hasta 20x20cms., sin incluir base y nivel. 1AP
1TC M2 5.70 502.72

Piso de losetas de cerámica importada de 15x15 hasta 20x20cms., incluyendo base y nivel.
1AP 1TC M2 4.75 603.26

Piso de losetas de cerámicas de fabricación nacional de 30x30 hasta 40x40 cms. Sin incluir base y
nivel 1AP 1TC M2 5.25 545.81

 Piso de losetas de cerámica de fabricación nacional 30x30 hasta 40x40cms.,incluyendo base y nivel.
1AP 1TC M2 4.30 666.40

Piso de losetas de cerámica importada de 30x30 hasta 40x40cms., sin incluir base y nivel.
1AP 1TC M2 4.60 622.93

Piso de losetas de cerámica importada de 30x30 hasta 40x40cms., incluyendo base y nivel.
1AP 1TC M2 4.00 716.38

Colocación de vibrazos en pisos para parques y terrazas. 1AP 1AY 1TC M2 12.50 313.94
Colocación de torcho de 20x20 y 25x25 cms. 1AP 1AY 1TC M2 15.00 261.62
Colocación de zócalos corrientes. 1AP 1TC M.L. 30.00 95.52
Colocación zócalos de ceramica 1AP 1TC M.L. 26.50 108.13
Colocación de zócalos corrientes para escaleras. 1AP 1TC M.L. 17.00 168.56
Colocación de zócalos de granito para pisos. 1AP 1TC M.L. 20.00 143.28
Colocación de zócalos de ceramica para escaleras. 1AP 1TC M.L. 20.00 143.28
Colocación de zócalos de granito para escaleras. 1AP 1TC M.L. 13.00 220.42
Colocación de losetas de ladrillo o cemento para pisos hexagonales, ferias y otros no
M2. 6.80 421.40
especificados.                 1AP 1TC     
Colocación de losetas de ladrillo de 12.5x25cms. 1AP 1TC M2 8.80 325.63
Colocación de losetas de ladrillo en terrazas de 15x15 y 20x20 cms. 1AP 1TC M2 8.80 325.63
Quicio y entre puertas. 1AP 1TC M.L. 13.25 216.26
colocación piso porcelanato 1AP 1 TC REND. 4MT² ML 4.00 716.38

REVESTIMIENTO DE MUROS EN CERAMICA

Rendimiento

Colocación de losetas de cemento para baños de 12.5x25 cms.  1AP 1TC M2 8.00 358.19
Colocación de azulejos 15x15cms., con junta trabada. 1AP 1TC M2 5.00 573.10
Colocación de azulejos10x10cms., en plumilla.                          1AP 1TC                                       M2 2.50 1,146.20
Colocación de azulejos 10x10cms., con junta con junta corrida 1AP 1TC M2 3.00 955.17
Colocación de azulejos en combinación 1AP 1TC M2 4.30 666.40
Colocación de azulejos 15x15cms, con junta corrida 1AP 1TC M2 5.25 545.81
Bañera revestida con azulejos altura 30cms., hasta 1.50 mts. 1AP 1TC Unid 0.75 3,820.67
Bañera revestida con azulejos altura 30cms., desde 1.50mts. hasta 1.80mts. de largo. 1AP
Unid 0.65 4,408.46
1TC
Mochetas de azulejos         1AP 1TC M.L. 8.00 358.19
Mochetas de cerámica de fabricación nacional. 1AP 1TC M.L. 7.00 409.36
Mochetas de cerámica importada 1AP 1TC M.L. 6.50 440.85
colocación listelo/cenefa 1AP 1TC M.L. 31.00 92.44
Colocacion de biceles plasticos en juntas de ceramica 1AP 1TC M.L. 70.00 40.94
Colocación en paredes de losetas de cerámica de fabricación nacional, de 15x15 hasta 20x20cms.
1AP 1TC M2 5.25 11.24

Colocación en paredes de losetas de cerámica importada, de 15x15 hasta 20x20cms.


1AP 1TC M2 4.75 603.26

Colocación en paredes de losetas de cerámica de fabricación nacional, de 30x30 hasta 40x40 cms.
1AP 1TC M2 4.00 716.38
Colocación en paredes de losetas de cerámica importada, de 30x30 hasta 40x40cms.
M2 3.50 818.71
1AP 1TC
Hechura de base para baño. 1AP 1TC Unid 6.00 477.58
Hechura de meseta de baño revestida en azulejos o cerámica. 1AP 1TC Unid 2.30 1,245.87
Colocación de losetas para revestir muros de 8x20cms. 1AP 1TC M2 3.50 818.71
Colocación de losetas para revestir muros de 5x20cms. 1AP 1TC M2 3.00 955.17
Colocación de losetas ornamentales en paredes. 1AP 1TC M2 4.00 716.38
colocación en paredes de losetas cerámica fab. nac., de 15x15 cms hasta 20x20 cms M2 575.71
corte de losetas de cerámica UD 5.00
Limpieza y Derretido En Junta M2 45

TRABAJOS DE MARMOL

Rendimiento

Colocación de mármol picado 1AP 1TC M2 1.30 2,204.23


Colocación de mármol de fabricación nacional en escaleras. 1AP 1TC M.L. 4.00 716.38
Colocación de mármol importado en escaleras. 1AP 1TC M.L. 3.25 881.69
Colocación de mármol fachaico en una sola pieza. 1AP 1TC M2 2.50 1,146.20
Colocación de mármol de fabricación nacional, en revestimiento de paredes. 1AP 1TC M2 2.50 1,146.20
Colocación de mármol importado en revestimiento de paredes. 1AP 1TC M2 2.15 1,332.79
Colocación de mármol para revestimientos en muros y pisos 1AP 1TC M2 3.00 955.17
Colocación de mármol travertino en tiritas 1AP 1TC M2 2.00 1,432.75
Colocación de zócalos de marmol para pisos. 1AP 1TC M.L. 20.00 143.28

ESCALONES

Rendimiento

Confección de escalones revestidos de mezcla 1AS 1TC M.L. 8.00 308.75


Terminación de escalones de cemento 1AS 1TC M.L. 8.00 308.75
Terminación escalón revestido de ceramica 1AS 1TC M.L. 7.80 316.67
Montura de escalones en escaleras huella y contrahuella. 1AP 1TC M.L. 8.00 358.19
Revestimiento de escalones en mosaico. 1AP 1TC M.L. 9.50 301.63
Montura de escalones en accesos de granitos. 1AP 1TC M.L. 7.00 409.36
Escalones revestidos de cerámica de fabricación nacional incluyendo huella, contrahuella y vuelo.
M.L. 4.90 584.80
1AP 1TC
Escalones revestidos de cerámica importada incluyendo huella, contrahuella y vuelo. 1AP
M.L. 4.00 716.38
1TC
Confección de escalones y revestimiento de ladrillo. 1AP 1TC M.L. 3.90 734.74
Revestimiento de escalones 1AP 1TC M.L. 4.75 603.26

TRABAJOS EN LADRILLOS

Rendimiento

Colocación de piedra caliza aserrada. 1AP 1TC M2 3.50 818.71


 Colocación de piedra caliza labrada Y colocacion de laja en muros 1AP 1TC M2. 4.00 716.38
Colocación de piedras blancas, tipo San Cristóbal, Cambita, Azulada, La Cumbre “callao”, de río, etc.
M2 3.50 818.71
1AP 1TC
Colocación de piedra de roca o cantos rodados, tipo encache de 0.20 a 0.30M espesor en
M2 3.85 744.29
revestimiento de terraplenes, con fines decorativos. 1AP 1TC
Colocación de piedra de roca o cantos rodados, tipo encache de 0.20 a 0.30M espesor en
M2 8.80 280.68
revestimiento de terraplenes, canales y cunetas. 1AS 1TC
Colocación de piedra de roca o cantos rodados en muro de mampostería con fines decorativos.
M3 0.95 3,016.32
1AP 1TC

Colocación de piedra de roca o cantos rodados en muro de mampostería. 1AS 1TC M3 2.35 1,051.06

ACERAS Y CONTENES

Rendimiento
Construcción de acera frotada y violinada 1AP 1AY 1TC 1TNC M2 20.50 231.61
Construcción de contenes 55x30x15 cms. 1AP 1AY 1TC 1TNC M.L. 19.70 241.02

ACARREOS

Arranque km 7.50
Derecho de mina m3n 25.00
Medio ambiente m3n 6.50
Regado y Nivelado de Relleno de reposición m3 120.00
Acarreo materiales (distancia desde 0.00 kms hasta 5.00 Kms) m3e/km 21.34
Acarreo materiales (distancia desde 5.00 kms hasta 10.00 Kms) m3e/km 16.57
Acarreo materiales (distancia desde 10.00 kms hasta 20.00 Kms) m3e/km 15.70
Acarreo materiales asfáltico (distancia desde 20.00 Kms en adelante) m3e/km 15.41
Acarreo material de bote de (0.00-5.00)m m3e/km 21.34
Bote de material carguio de 6 mt3 CAMION 6000

TARIFA DE VARILLA

Rendimiento
Mano obra colocacion malla electrosoldada 1MA, 1 AY, 1TC m2 92.05 48.14
Mano de obra acero zapata de muros ml 100.00
Mano de obra acero alta resistencia porticos (vigas y cols) qq 637.40
Mano de obra acero grado en losas y zapatas de cols qq 401.30
Mano de obra acero en muros de hormigon armado m2 133.76
Mano de obra acero en zapatas de muros, cols de carga ml 133.76
Mano de obra acero en dinteles y vigas de amarre ml 133.76
Mano de obra acero en nervio losas aligeradas ml 40.00
Calzos qq 5.00
Coloc. acero alta resistencia 1 MA, 2 AY, 1 TC QQ 8.95 613.41
Coloc. acero columna, losa y viga. 3/8" ó 1/2", hasta 6 de 1/2" 1 MA, 1 AY, 1 TC ML 32.58 136.01
Coloc. acero zapata de muros, cols y vigas amarre 1 MA, 1 AY, 1 TC ML 32.58 136.01

PINTURA

Mano pintura texturizada m2 25.00


1era. Mano pintura de agua m2 40.37
2da. Mano pintura de agua m2 26.91
1era. Mano pintura de aceite m2 43.08
2da. Mano pintura de aceite m2 40.37
1era. Mano pintura en superficie rústica m2 67.28
2da. Mano pintura en superficie rústica m2 56.54
Mano de obra pintura texturizada ( 1 mano ) m2 43.08
Aplicación impermeabilizante una mano m2 70.91
Aplicación impermeabilizante segunda mano m2 26.71
Rapillado total y/o parcial m2 45.76
Oxido de zinc 1era mano m2 31.52
Oxido de zinc 2da mano m2 23.66
Mano de obra levantamiento impermeabilizante M2 25.00
Bajada de material M3 260.00
M.O aplicación dos manos a pistola MT² 75.00

CARPINTERIA

Encofrado columnas (0.20 x 0.20)m ATC, 1er. Nivel ml 600.00


Encofrado columnas (0.25 x 0.25)m ATC, 1er. Nivel ml 600.00
Encofrado columnas (0.20 x 0.20)m ATC, 2do. Nivel ml 600.00
Encofrado columnas (0.20 x 0.20)m ATC, 3er. Nivel ml 600.00
Encofrado columnas (0.20 x 0.50)m ATC ml 600.00
Encofrado columnas (0.20 x 0.50)m ATC ml 600.00
Encofrado columnas (0.20 x 0.50)m ATC, 2do. Nivel ml 600.00
Encofrado columnas (0.20 x 0.50)m ATC, 3er. Nivel ml 600.00
Encofrado columnas (0.20 x 0.30)m ATC ml 600.00
Encofrado columnas (0.20 x 0.40)m ATC ml 560.00
Encofrado columnas (0.20 x 0.30)m ATC, 2do. Nivel ml 600.00
Encofrado columnas (0.30 x 0.30)m ATC, 1er. Nivel ml 600.00
Encofrado columnas (0.35 x 0.35)m ATC, 1er. Nivel ml 600.00
Encofrado columnas (0.20 x 0.30)m ATC, 3er. Nivel ml 600.00
Encofrado columnas (0.30 x 0.70)m ATC, 1er. Nivel ml 600.00
Encofrado columnas (0.30 x 0.80)m ATC, 1er. Nivel ml 822.66
Encofrado columnas (0.50 x 0.75)m ATC, 1er. Nivel ml 890.00
Encofrado columnas (0.50 x 0.80)m ATC, 1er. Nivel ml 920.00
Encofrado columnas (0.30 x 0.40)m ATC, 1er. Nivel ml 560.00
Encofrado columnas (0.40 x 0.80)m ATC, 1er. Nivel ml 860.00
Encofrado columnas (0.40 x 0.70)m ATC, 1er. Nivel ml 800.00
Encofrado columnas (0.30 x 0.80)m ATC, 1er. Nivel ml 800.00
Encofrado columnas (0.40 x 0.60)m ATC, 1er. Nivel ml 740.00
Encofrado columnas (0.40 x 0.40)m ATC, 1er. Nivel ml 620.00
Encofrado columnas (0.45 x 0.45)m ATC, 1er. Nivel ml 680.00
Encofrado columnas (0.50 x 0.50)m ATC, 1er. Nivel ml 740.00
Encofrado columnas (0.60 x 0.60)m ATC, 1er. Nivel ml 860.00
Encofrado columnas 0.50 X1.20 MT ATC, 1er. Nivel ml 1,100.00
Encofrado columnas 0.40 X1.20 MT ATC, 1er. Nivel ml 1,100.00
Encofrado columnas (0.70 x 0.70)m ATC, 1er. Nivel ml 980.00
Encofrado columnas (0.60 x 0.70)m ATC, 1er. Nivel ml 920.00
Encofrado viga (0.30 x 0.40)m ATC ml 500.00
Encofrado viga (0.30 x 0.5)m ATC ml 650.00
Encofrado viga (0.30 x 0.55)m ATC ml 700.00
Encofrado viga (0.30 x 0.60)m ATC ml 800.00
Encofrado viga (0.40 x 0.60)m ATC ml 900.00
Encofrado viga (0.30 x 0.65)m ATC ml 900.00
Encofrado viga (0.30 x 0.70)m ATC ml 1,000.00
Encofrado viga (0.30 x 0.80)m ATC ml 1,300.00
Encofrado viga (0.30 x 0.85)m ATC ml 1,300.00
Encofrado viga (0.30 x 1.00)m ATC ml 1,300.00
Encofrado viga (0.20 x 0.40)m ATC ml 400.00
Encofrado viga (0.20 x 0.65)m ATC ml 800.00
Encofrado viga (0.20 x 0.45)m ATC ml 400.00
Encofrado viga (0.25 x 0.50)m ATC ml 650.00
Encofrado viga (0.20 x 0.60)m ATC ml 650.00
Encofrado viga (0.20 x 0.63)m ATC ml 650.00
Encofrado viga (0.20 x 0.70)m ATC ml 650.00
Encofrado viga (0.20 x 0.80)m ATC ml 1,100.00
Encofrado viga (0.20 x1.00)m ATC ml 1,100.00
Encofrado viga (0.25 x 0.63)m ATC ml 800.00
Encofrado viga (0.40 x 0.55)m ATC ml 800.00
Encofrado viga (0.40 x 80)m ATC ml 1,300.00
Encofrado viga (0.20-0.25 x 1.00)m ATC ml 1,300.00
Encofrado viga (0.20 x 0.40)m ATC , 2do. Nivel ml 650.00
Encofrado viga (0.20 x 0.40)m ATC , 3er. Nivel ml 650.00
Encofrado muros ATC m2 425.00
Encofrado viga (0.20 x 0.35)m ATC ml 650.00
Encofrado viga de amarre (0.20 x 0.20)m ATC ml 250.00
Encofrado viga de amarre (0.15 x 0.20)m ATC ml 250.00
Encofrado dinteles (0.20 x 0.15-0.2)m ATC ml 250.00
Encofrado columnas de amarre (tapa-tapa)m ATC (0.20 x 0.15-0.2) ml 169.00
Encofrado columnas de amarre (0.20 x 0.15-0.2) ml 250.00
Encofrado viga zapata >0.50 x 0.50 <0.60 x 0.60 mts ml 270.00
Encofrado escalera (e=0.15m) ATC m2 260.00
Encofrado losas (e=0.13)m ATC m2 260.00
Encofrado losas (e=0.15)m ATC (cuatro agua) m2 325.00
Encofrado vuelos ATC ml 220.00
guarderas de 0.20 a 0.80 mts ml 150.00
guarderas de 0.95 mts ml 360.00
Madera a todo costo (GUARDERAS) ML 225.00
Encofrado viga de amarre Todo Costo (1 AP, 2 AY) REND. 22 ML 371.07 375
Columnas < 0.30m de cara, por cara (1T1, 2 AY) REND. 9.50 ML 429.66 305
Vigas sobre muros > 0.30m < 0.50m (1 AP, 2 AY) REND. 15.5 ML 263.34 525
Vigas de carga 0.15m a 0.20m x Altura < 0.40m (1T1, 2 AY) REND. 9.50 ML 429.66 RD$730.00
Vigas de carga 0.15m a 0.20m x Altura > 0.40m, para cada cm adicional hasta 0.80m, a partir de 0.80m se considera muro (1T1, 2 AY)
REND. 9.50 ML 159.44 RD$24.50

Vigas de carga > 0.20m de base, para cada cm adicional hasta 0.50m, a partir de 0.50m se considera muro (1T1, 2 AY) REND. 9.50 ML 260.13 RD$24.50
Viga riostra (0.15mx0.25m) (1T1, 2 AY) REND. 22 ML 112.33

Columnas > 0.30m de cara, por cada 0.10m de ancho hasta 0.80m, a partir de 0.80m se considera muro (1T1, 2 AY) REND. 6.5 ML 380.19
ACARREOS Y SUBIDAS DE MATERIALES

Acarreo interno bloques de 0.20 ud 1.25


Acarreo interno bloques de 0.15 ud 1.01
Acarreo interno bloques de 0.10 ud 1.38
Acarreo interno de pisos m2 7.13
Transporte interno arena gruesa y pañete m3 94.35
Transporte interno grava y gravilla m3 125.80
Transporte interno cemento y cal fdas 6.47
Subida de bloques al 2do. Nivel de 0.20m ud 1.66
Subida de bloques al 3er. Nivel ud 2.49
Subida de bloques al 4to. Nivel ud 3.32
Subida de bloques al 5to. Nivel ud 4.15
Subida de bloques al 2do. Nivel de 0.15m ud 1.33
Subida de bloques al 3er. Nivel ud 1.99
Subida de bloques al 4to. Nivel ud 2.65
Subida de bloques al 5to. Nivel ud 3.32
Subida de bloques al 2do. Nivel de 0.10 m ud 1.81
Subida de bloques al 3er. Nivel ud 3.06
Subida de bloques al 4to. Nivel ud 3.98
Subida de bloques al 5to. Nivel ud 5.69
Subida de cemento al 2do. Nivel fdas 8.53
Subida de cemento al 3er. Nivel fdas 13.58
Subida de cemento 4to. Nivel fdas 17.57
Subida de cemento 5to. Nivel fdas 22.98
Subida de arena al 2do. Nivel m3 124.49
Subida de arena al 3er. Nivel m3 248.98
Subida arena gruesa y de pañetes 4to. Nivel m3 373.46
Subida arena gruesa y de pañetes 5to. Nivel m3 497.95
Subida de grava al 2do. Nivel m3 165.98
Subida de grava al 3er. Nivel m3 331.97
Subida de grava al 4to. Nivel m3 497.95
Subida de grava al 5to. Nivel m3 663.93
Subida pisos o revestimientos 2do. Nivel m2 7.13
Subida pisos o revestimientos 3er. Nivel m2 11.52
Subida pisos o revestimientos 4to.. Nivel m2 17.37
Subida zócalos para pisos 2do. Nivel ml 0.57
Subida zócalos para pisos 3er. Nivel ml 1.04
Subida zócalos para pisos 4to.. Nivel ml 1.55
Subida derretido y pegamento 2do. Nivel fda 6.47
Subida derretido y pegamento 3er. Nivel fda 10.29
Subida derretido y pegamento 4to. Nivel fda 13.32
D7G-CAT 200 2,301.90 2,716.24
1,232.00 246.40 4,194.64
950-CAT 130.00 1,637.59 1,932.36
800.80 160.16 2,893.32

ANDAMIOS

Confección andamios interiores m2 0.23


Colocación Andamio En Techos m2 0.69
Confección E Instalación De Andamios Exteriores, Por Cada P2 De Madera Utilizada p2 30.00

LABORES VARIAS

Colocacion del foam ml 27.98


Pulido y cristalizado de pisos m2 RD$350.00
Brillado MT² 150.00
Cristalizado MT² 80.00
Pulido y brillado de zocalos ml 15.00
Pulido y brillado piso de marmol (incl. Cera) m2 186.00
Terminación helipcótero m2 120.00
Piso de hormigón estampado (mano de obra) m2 190.00
Colocacion de Tejas m2 225.00
Colocacion alambre tipo trinchera ml 25.00
M.O. Mezclado m3 200.00
ligado y vaciado a mano de dinteles, vigas y columnas de amarre ml 40.00
Preparación de superficie para vaciado de piso m2 20.00
Preparación de superficie para colocación de adoquines m2 36.00
Apisonado para colocación de adoquines m2 18.00
Corte chazos piso de granito y porcelanato ud RD$25.00
Corte chazos piso de ceramica ud 5.00
Corte chazos de zocalos cerámica ud 8.00
Corte chazos zocalo de granito ud 8.00
Corte chazos zocalo de marmol ud 8.00
Corte de ceramica para revestimientos ud 5.00
Corte chazos piso de marmol ud 10.00
Corte De Chazos de porcelanato Ud

colocación piso porcelanato ML

Brigada Reducida Topografia Día 3,500.00


Estacion total Día 10,000.00

Brigada Topográfica para replanteo y charrancha de preliminares DIA 17,700.00

Limpieza especial muros con acido muriatico M2 10.00


MO derretido pisos m2 15.45
M.O demolicion fino techo inclinado Mt² 120
Demolición a mano elementos hormigón armado (zapatas, vigas, cols.) 1tc, rend. 0.45mt3 M3 2002.77777777778

Traslado material de demolicion de fino techo inclinado D/H 95


M.O. Confección Hoyos Verja Delimitante En Zinc Y Madera H=1.80Mts Ml 35.00
M.O. Fijación (Todo Costo) Verja Delimitante En Zinc Y Madera H=1.80Mts Ml 80.00
Traslado De Butacas, Sillas Y Mesas aula 1,350.00
Desmonte y Montura de pizarras und 1,100.00
Regado y mojado Mt³ 175.00
Mano de obra Inst. de Puerta incluye Llavín UND 2,144.73
Limpieza Canaleta 40X60Cm (C/Parrilla) ML 2,000.00
Tapa hormigon p/registro de 1*1 mt c/orja UD 700.00
Ligadora de 2 Fundas Hr. 500.00
Excavación para postes Cerramiento de área en construcción, en madera y Aluzinc, con una pu UD 36.00
Concreto postes Cerramiento de área en construcción, en madera y Aluzinc, con una puerta ve UD 44.00
Relleno reposición Cerramiento de área en construcción, en madera y Aluzinc, con una puerta UD 18.00

MANO DE OBRA DE ELECTRICIDAD

SALIDA CENITAL EN EMT SIN ROSETA UD 650.00


SALIDA CENITAL EN EMT DE PARED CON ROSETA UD 650.00
SALIDA CENITAL EN EMT CON ROSETA UD 650.00
SALIDA CENITAL CON LAMP T/SECADOR DE BAJO CONSUMO en pared UD 800.00
SALIDA CENITAL CON GLOBO DE 6" UD 600.00
SALIDA CENITAL PARA LAMPARA (2T/.T8/32W) LISA UD 700.00
SALIDA CENITAL P/LAMP. (3T/.T8/32W T/PLADF. PARABOLICA) UD 900.00
SALIDA CENITAL PARA LAMPARA (1T/.T8/32W) LISA UD 800.00
SALIDA CENITAL PARA LAMPARA Tipo Cobra 150W UD 885.94
SALIDA ABANICO DE TECHO CON ABANICO KDK B56 DE 56" UD 1,200.00
SALIDA ABANICO DE TECHO CON ABANICO KDK M40R ORBITAL DE 16" UD 950.00
SALIDA ABANICO DE PARED KDK M40C UD 750.00
SALIDA DE INTERRUPTOR SENCILLO UD 885.94
SALIDA PARA PULSADOR DE Timbre UD 500.00
SALIDA DE Timbre UD 500.00
SALIDA DE Timbre T/CAMPANA DE 10" UD 600.00
SALIDA DE INTERRUPTOR DOBLE UD 885.94
SALIDA DE INTERRUPTOR TRIPLE UD 575.00
SALIDA DE INTERRUPTOR THREE WAY UD 600.00
SALIDA DE TOMACORRIENTE DOBLE 120V POLARIZADO UD 500.00
SALIDA DE TOMACORRIENTE DOBLE 120V POLARIZADO CON TAPA DE METAL UD 500.00
SALIDA DE TOMACORRIENTE DOBLE 120V POLARIZADO PARA UPS UD 500.00
SALIDA DE TOMACORRIENTE 220V POLARIZADO UD 700.00
SALIDAS PARA DATAS UD 450.00
SALIDAS PARA TELEFONO UD 450.00
SALIDAS PARA ANTENA UD 450.00
REGISTRO 4" X 4" AMERICANO UD 50.00
Mano obra instalacion Salida Control para Abanico Techo KDK UD 300.00
M.O. Colocacion lampara Tipo Cobra 150W UD 500.00
Instalacion electrica caseta de materiales Ud 5,900.00

MONTURA DE APARATOS (EXCLUSIVAMENTE)

Mano de Obra Instalación inodoro elongado de porcelana sanitaria antibacteria UND 1,283.75
Inodoro corriente de una pieza ud 2,890.36
Inodoro corriente de dos piezas ud 1,111.30
Inodoros especiales de un cuerpo o pieza ud 1,822.07
Inodoros de pared ud 1,822.07
Instalación inodoros fluxómetros ud 1,500.00
Instalación inodoros sencillos ud 809.27
Instalación orinal fluxómetro ud 1,336.19
Instalación orinal sencillo ud 1,012.82
Orinal ud 2,190.00
Orinales de media falda ud 1,231.85
Orinales de falda ud 1,416.63
Instalación lavamanos empotrados en meseta ud 1,416.63
Instalación lavamanos con pedestal ud 1,416.63
Instalación lavamanos corriente ud 809.27
Instalación bañeras ud 1,500.00
Instalación jacuzzi ud 25,000.00
Monturas de mezcladoras de baños ud 750.00
Llaves empotradas para ducha ud 403.81
Instalación duchas hansgrohe ud 700.00
Instalación fregadero doble ud 1,416.63
Instalación fregadero sencillo ud 1,111.30
Instalación lavadero sencillo ud 850.00
Instalación lavadero doble ud 1,000.00
Lavadoras automáticas domésticas ud 1,618.53
Instalación calentador hasta 12 gls ud 1,618.53
Instalacion de plato para ducha ud 880.10
Colocación accesorios bano principal ud 1,500.00
Colocación accesorios bano servicio ud 750.00
montura de accesorios de lavamano ud 300.00
Instalación lavamanos empotrados en meseta UD 2,247.21
Tinaco antialgas de 500 gls P.A. RD$5,455.25

DESAGUE DE APARATOS SANITARIOS Y DE PISO

Inst. desague aparatos 4" ud 911.04


Inst. Desague aparatos 2" ud 1,122.30
Desagüe de inodoros de pared ud 1,111.30
Inst. desague 2" para piso ud 809.27
Inst. desague 3" para piso ud 849.73
Inst. desague 4" para piso ud 911.04
Inst. desague 6" para piso ud 1,001.46
Salida drenaje p/inodoros Ø4" PVC ML 1,445.20
Salida drenaje p/ilavamanosØ" PVC ML 33.86
Salida drenaje p/inodoros Ø2" PVC ML 23.76
Salida agua fria de 1/2" PVC (P/inodoros ML 9.50
Salida agua fria de 1/2" PVC (P/lavamanos ) ML 9.50
Salida agua fria de 1/2" PVC (P/orinales ) ML 9.50
Tuberias de 1" PVC ( presion ) todo incluido ML 19.01
desague de piso de 2 pulgadas (Incl. Parrilla) Ud 809.27

Instalación tuberías 1/2" y 3/4" (1 MA. 1 AY) rend 356.52 ML 6.93


Instalación tuberías 1" (1 MA. 1 AY) rend 178.26 ML 13.86
Instalación tuberías 4" (1 MA. 1 AY) rend 39.05 63.28
Instalación tuberías 6" (1 MA. 1 AY) rend 71.26 ML 34.68

Replanteo de Tuberías Ml 15.00

SALIDAS DE AGUA POTABLE INST. Y PAGO SALIDAS DE AGUA EN A. SANIT.

Salida de agua fría ud 707.49


Salida de agua caliente ud 707.49
Salidas de agua potable de 1/2 ud 525.82
Salidas de agua potable de 3/4 ud 525.82
Salida de agua fría a inodoro ud 911.04
Salida de agua fría a inodoro fluxómetro ud 1,416.63
Salida de agua fría a orinal ud 911.04
Inst. Salida de agua fría y caliente lavamanos ud 862.00
Inst. Salida de agua fría y caliente calentador ud 911.04
Salida de agua fría a baño de ducha ud 707.49
Instalación de filtros de agua domiciliarias ud 911.04

COLUMNAS DE AGUA POTABLE

Inst. columna de agua fría 1/2" ud 615.21


Inst. columna de agua fría 3/4" ud 615.21
Inst. columna de agua fría 1" ud 703.71
Inst. columna de agua fría 1 1/2" ud 792.21
Inst. columna de agua fría 2" ud 792.21
Columna de agua fria ø 1" 3 niveles ud 1,600.00

VENTILACION

Instalación ventilación de 2" ud 707.49


Instalación ventilación de 3" ud 809.27
Instalación ventilación de 4" ud 911.04
Instalación ventilación de 3" cuatro níveles ud 1,972.00
Ventilacion de 2" ml 525.82
Ventilacion de 3" ml 601.46

BAJANTES DE DESCARGA Y BAJANTES PLUVIALES

Instalación de bajante 1 ½” ud 607.36


Instalación de bajante 2" ud 707.49
Instalación de bajante 3" ud 809.27
Instalación de bajante 4" ud 1,012.82
Instalación de bajante 3" dos níveles ud 1,618.54
Instalación de bajante pluvial 3" ud 809.27
Instalación de bajante pluvial 4" ud 1,012.82
Instalación de bajante pluvial 2" ud 707.49
Instalación de bajante pluvial 3" cinco níveles ud 2,430.00
Instalación de bajante pluvial 4" cuatro niveles ud 2,433.60
Bajante pluvial de 3" ml 525.82

MANO DE OBRA COLOCACION PIEZAS PVC

Instalación tapón de registro 4" ud 225.00


Instalación tapón de registro 3" ud 180.00
Instalación tapón de registro 2" ud 148.45
Instalación piezas pvc 1/2" boca 8.54
Instalación piezas pvc 3/4" boca 9.76
Instalación piezas pvc 1" boca 14.78
Instalación piezas pvc 1 1/2" boca 21.34
Instalación piezas pvc 2" boca 21.34
Instalación piezas pvc 3" boca 26.27
Instalación piezas pvc 4" boca 32.83
Colocación de tee 8" ud 99.00
Colocación codos 8" ud 66.00
Colocacion Yee reducida 8" @ 6" ud 90.00

CONEXION O EMPALME A TUBERIA EXISTENTE DE AGUA POTABLE

En tuberías de ½” ó ¾” ud 809.27
En tuberías de 1” ud 1,012.82
En tuberías de 1” a 1 ½” ud 1,213.08
En tuberías de 1½” a 2” ud 1,416.63

CONEXION O EMPALME A TUBERIA EXISTENTE DE ARRASTRE

En tubería de 2” ud 607.36
En tubería de 3” ud 809.27
En tubería de 4” ud 1,012.82
En tubería de 6” ud 1,213.08

ARRASTRE DOMICILIARIO, PAGO POR MLA PARTIR DEL CUARTO DE BAÑO

Tuberías de 2” ml 44.32
Tuberías de 4” ml 54.17
Tuberías de 5” ml 90.29
Tuberías de 6” ml 113.26

INSTALACIONES DE TUBERÍAS (PVC)

Colocacion tuberias de 10" PVC ml 39.40


Colocacion tuberias de 12" PVC ml 42.68
Colocacion tuberias de 6" PVC ml 29.97
Colocacion tuberias de 8" PVC ml 32.83
Colocacion tuberias de 3" PVC ml 21.34
Colocacion tuberias de 4" PVC ml 24.62
Colocacion tuberias de 1/2" PVC ml 5.99
Colocacion tuberias de 3/4" PVC ml 5.99
Colocacion tuberias de 1" PVC ml 11.98
Colocacion tuberias de 2" PVC ml 14.98
Colocacion tuberias de 11/2" ml 14.98

INSTALACIÓN DE LLAVES PASO DOMICILIARIAS

Instalacion de llave jardin de 1/2"" ud 911.04


Instalacion de valvula de 1/2" ud 403.81
Instalacion de valvula de 3/4" ud 607.36
Instalacion de valvula de 1" ud 1,111.30
Instalacion de valvula de 11/2" ud 1,222.43
Instalacion de valvula de 2" ud 1,344.67
Instalacion de valvula de 3" ud 1,479.14
Instalacion de valvula de 4" ud 1,627.05
Instalacion de llave de paso de ø 11/2" en tuberia de cobre ud 1,618.53
Instalacion de llave de paso de ø 1" en tuberia de cobre ud 1,541.15
Instalacion de llave de paso de ø 3/4" en tuberia de cobre ud 1,416.63
Instalacion de llave de paso de ø 1/2" en tuberia de cobre ud 1,213.08
TUBERIA Y PIEZAS HIERRO GALVANIZADO

Colocacion tuberias de 11/2" galvanizada ml 26.27


Colocacion tuberias de 2" galvanizada ml 32.83
Colocacion tuberias de 2½" galvanizada ml 39.40
Colocacion tuberias de 3" galvanizada ml 44.32
Colocacion tuberias de De 4” galvanizada ml 54.17
Colocacion tuberias de De 6”galvanizada ml 68.94
Colocacion tuberias de De 8” galvanizada ml 77.15
Tubería galvanizada de1” ml 21.34
Instalación piezas HG de 2" ud 42.00
Instalación piezas HG de 1 1/2" ud 33.00

INSTALACIONES DE TUBERÍAS DE HIERRO FUNDIDO O DE ACERO

De 3” ml 44.32
De 4” ml 54.17
De 6” ml 68.94
De 8” ml 77.15
De 10” ml 105.05
De 12” ml 162.51

LABORES VARIAS

Instalación de sépticos y filtrantes de 4” ud 3,639.23


Instalación de sépticos y filtrantes de 5” ud 3,639.23
Instalación de sépticos y filtrantes de 6” ud 4,044.68
Instalación de sépticos y filtrantes de 8” ud 4,448.49
Conexión de camaras y registros ud 1,110.00
Conexión a septico y filtrante de 4" ud 3,164.55
Conexión a septico y filtrante de 6" ud 3,517.12
Conexión a septico y filtrante de 8" ud 3,868.26
Limpieza general en lavamanos e inodoros ud 200.00
Limpieza camara septica ud 4,000.00
Limpieza y desinfeccion de cisterna ud 1,200.00
Limpieza trampa de grasa ud 2,000.00
Confeccion trampa de grasa ud 1,500.00
Confeccion registro de inspeccion ud 1,500.00
Instalacion trampa de grasa sencilla ud 1,822.07
Instalacion trampa de grasa doble camara ud 2,831.30
Instalación de cámara y registro de limpieza ud 1,111.30
Conexión a trampa de grasa doble ud 2,462.00
Conexión a trampa de grasa sencilla ud 1,584.41
Conexión a registro ud 825.94
Conexión a cloaca existente p.a. 2,500.00
Instalación de cisternas, montura de bombas de agua en cisternas con diámetro de ¾” a 1” ud 8,089.36
Instalacion tapa cisterna ud 1,500.00
Cajas de ValvulasTelescópicas ud 134.61
Cajas de Valvulas Sencillas ud 113.26
Instalacion de Hidrantes ud 3,438.96
Confección pileta de cerámica Vertedero p/baños (revestido de ceramica)
ud 2,000.00
Limpieza de lodos p.a. 75.00
Transporte p.a. 321.03
Regado y mojado Mt³ 225.00

PUERTAS, VENTANAS Y ALUMINIO- VIDRIO

Marcos de madera ml 360.80


Puertas de madera preciosa a todo costo ud 22,000.00
Puerta principal de madera preciosa a todo costo ud 25,000.00
Cerradura de seguridad baldwin ud 9,200.00
Puertas corredizas de madera a todo costo m2 10,115.18
Puertas de Polimetal ud 6,500.00
Puerta Acustica ud 20,000.00
Vent de madera a todo costo m2 3,300.00
Puertas y Ventanas corrrederas vidrio Claro y aluminio blanco m2 3,600.00
Ventanas correderas de cristal aluminio blanco Perfil P92 Gris, Vidrios Blue-Green. m2 5,396.14
Ventana Proyectada de Cristal aluminio blanco Perfil P92 Gris, Vidrios Blue-Green. m2 9,966.99
Ventana Abatible de Cristal aluminio blanco Perfil P92 Gris, Vidrios Blue-Green. m2 11,998.48

Ventanas de doble vidrio sin camara de aire, con marco interior , escurridor de agua y perfileria P92 M2 19,368.00

Puertas correderas de Aluminio Blanco y Vidrio claro Perfil P92 Gris, Vidrios Blue-Green. m2 5,078.72
Puertas de Cristal fijo y marco de aluminio tipo comercial m2 10,500.00
Puertas metalicas m2 4,000.00
Porton Vehicular de hierro m2 5,380.00
Verja de entrada en hierro m2 5,380.00
Vidrio Fijo y marco de aluminio blanco m2 3,552.00
Vidrio Fijo y marco de aluminio blanco Perfil P92 Gris, Vidrios Blue-Green. m2 4,316.91
Puertas en Closet de riel no plegadizas m2 6,933.33
Puertas en Closet y Despensa abatibles m2 5,702.80
Puertas en Closet y Despensa correderas m2 6,400.00
Puerta plegadiza en bano de servicio 0.70 x2.20 m ud 3,500.00
Puerta de tola 0.90 x 2.10 mts ud 7,000.00
Puertas MDF hidrofuga enchapada en roble, incluye instalacion ud 9,000.00
Puertas Everdoor (0.9 x 2.10) m ud 6,500.00
Cortinas de Banos en cristal (1.92 x 2.00) m2 4,427.08
Puerta de acero perforado m2 6,000.00
Puerta metalica m2 5,000.00
Puerta chapa (1.00 x 2.10) mts m2 9,523.81
Puerta chapa con rejilla en patinillo m2 9,523.81
Ventana de aluminio y vidrio oscilo batiente m2 10,157.44
Ventanas de aluminio y vidrio abatible de una o dos hojas fijas m2 10,157.44
Ventana en Lobby de aluminio y vidrio m2 9,141.70
Vidrio fijo natural templado m2 7,618.08
Puerta doble de cristal con bandas de vinilo (2.00 x 2.17) mts m2 11,238.10
Puerta cristal translucido y acero inoxidable (0.90 x 2.17) mts m2 10,613.76
Puerta de aluminio en zonas de AC m2 10,000.00
Mampara en vidrio templado P2 804.86
Mampara en vidrio templado m2 8,660.27
Baranda para balcones en aluminio y vidrio de acero inoxidable ml 7,500.00
Puertas lisa Polimetal 1.70*0.8mt ( cabina baños ) Ud 500.00
DIVISIONES LIGERAS

Plafond en PVC m2 600.00


Plafond sheet rock M2 850.00
Fascias sheetrock ML 550.00
Fascias en sheetrock de 10 cms. De profundidad ML 400.00
Fascias en sheetrock de 20 cms. De profundidad ML 500.00
Fascias en sheetrock de 40 cms. De profundidad ML 600.00
Sheet rock a dos caras M2 900.00

MISCELANEOS

Estuco a todo costo m2 125.00


Forro de madera de Cedro en Walking Closet m2 7,532.00
Baranda para escalera ml 3,228.00
Baranda para escalera en entrada principal ml 4,100.00
Pasamanos para escalera ml 2,500.00
Muebles de baños ml 10,000.00
Topes de baños en marmol m2 7,041.65
Estrias en rampa vehicular a todo costo m2 225.00
Pisos de marmol crema marfil, suministro, instalacion, pulido, a todo costo (ANTICATO) m2 2,977.38
Zocalos de marmol crema marfil, suministro, instalacion, pulido, a todo costo (ANTICATO) ml 803.04
Revestimientos de marmol crema marfil, suministro, instalacion, pulido, a todo costo (ANTICATO sin
cotizacion) m2 3,058.44

Zocalos de madera, suministro, instalacion, a todo costo ml 885.00


Tope de granito m2 6,348.40
Gabinetes de piso ml 8,200.00
Gabinetes de pared ml 8,200.00
Fumigacion m2 80.00
Pañete de yeso ATC m2 200.00
Cornisa en yeso en techo ml 0.00
Calentador de 30 gls ud 20,405.56
esquinero ud 1,350.00
Baños portatiles mes/ud 4,130.00
Rejilla para desague pluvial en parqueos ml 5,900.00
Masilla elastometrica ml 40.06
Piso de goma en gimnasio m2 2,261.83
Piso dinofelx para gimnasios m2 4,635.90
Rejilla de ventilación en cuarto de planta m2 3,000.00
Estuco Plastico valenciano a todo costo m2 800.00
Escalera metalica posterior a todo costo ud 85,000.00
Organizadores de closet closemaid ML 659.77
Colocacion y aplicacion Estampado al hormigon m2 281.02
Revestimiento madera sabina M2 1,069.29

IMPERMEABILIZANTE

Aislante termico PRODEX m2 413.00

Impermeabilizante Macdrain Geocompuesto Drenante con instalacion en muros de Contención m2 465.80

Impermeabilizante de techo de lona asfaltica e=4mm m2 413.00


Impermeabilizante de techo de lona asfaltica e=3mm m2 348.10
Aislante termico poliestireno tipo Danopreno 40 m2 1,770.00
PRECIO
DESCRIPCION PARTIDA CANTIDAD UD PRECIO UNITARIO UNITARIO sin ITBIS SUBTOTAL SUBTOTAL ITBIS TOTAL
itbis

1.000 Preliminares

1.01 Caseta almacén de materiales (4.85mx4.95mx3.00m) (madera de pino, plywood y zinc acanalado)

Plywood 3/4 ( 2 usos) 5.0000 PLANCHA 4,000.00 3,389.83 610.17 16,949.15 3,050.85 20,000.00
Clavos de Zinc 2.0000 LBS 120.00 101.69 18.31 203.39 36.61 240.00
Clavos corriente 3.0000 LBS 60.00 50.85 9.15 152.54 27.46 180.00
Madera Pino Americano Bruta (4 usos) 120.0000 P2 125.00 105.93 19.07 12,711.86 2,288.14 15,000.00
Zinc acanalado cal.29 24.0000 PLANCHA 380.00 322.03 57.97 7,728.81 1,391.19 9,120.00
Juego bisagras 2.0000 UND 165.00 139.83 25.17 279.66 50.34 330.00
Candado 1.0000 UND 295.00 250.00 45.00 250.00 45.00 295.00
Puerta (0.90 x 2.10 mts.) y Marco 1.0000 UD 5,462.96 4,629.63 833.33 4,629.63 833.33 5,462.96
Maestro 3.0000 Día 2,471.25 7,413.75 0.00 7,413.75
Carpintero de Segunda Categoria 4.0000 Día 1,568.75 6,275.00 0.00 6,275.00
Trabajador No calificado (TNC) 6.0000 Día 823.75 4,942.50 0.00 4,942.50
Instalacion electrica 1.0000 UD 5,900.00 5,900.00 0.00 5,900.00
Herramientas (2%) 0.0200 P.A. 50,627.96 42,905.05 7,722.91 1,012.56 154.46 1,167.02
COSTO/UD 68,448.86 7,877.37 76,326.23
COSTO/M2 1,396.92 160.76 1,557.68

Madera bruta de pino americano (4 usos) 120.00 p2 RD$105.93 RD$19.07 RD$12,711.86 RD$2,288.40 RD$15,000.26
Plywood de 3/4 5.00 plan RD$3,389.83 RD$610.17 RD$16,949.15 RD$3,050.85 RD$20,000.00
Zinc acanalado cal.29 24.00 UND RD$322.03 RD$57.97 RD$7,728.81 RD$1,391.28 RD$9,120.09
Clavos corrientes 3.00 UND RD$50.85 RD$9.15 RD$152.54 RD$27.45 RD$179.99
Clavos de zinc 2.00 UND RD$101.69 RD$18.31 RD$203.39 RD$36.62 RD$240.01
Juego bisagras 2.00 UND RD$139.83 RD$25.17 RD$279.66 RD$50.34 RD$330.00
Candado 1.00 UND RD$250.00 RD$45.00 RD$250.00 RD$45.00 RD$295.00
Inst. el[ectrica 1.00 UND RD$5,000.00 RD$900.00 RD$5,000.00 RD$900.00 RD$5,900.00
Mano de Obra RD$0.00
Maestro 3.00 DIA RD$2,471.25 RD$0.00 RD$7,413.75 RD$0.00 RD$7,413.75
Trabajador 2da categoría 4.00 DIA RD$1,568.75 RD$0.00 RD$6,275.00 RD$0.00 RD$6,275.00
Peon 6.00 DIA RD$823.75 RD$0.00 RD$4,942.50 RD$0.00 RD$4,942.50
Total/UND RD$61,906.66 RD$7,789.94 RD$69,696.60

1.02 Suministro e instalación letrero identificativo de la obra, tipo banner (tamaño de 8'x4', valla impresa a todo color y tensada sobre estructura de metal con perfiles metálicos)

Arte e impresión en vilnil y colocación 1.0000 PA 26,500.00 22,457.62 4,042.37 22,457.62 4,042.37 26,500.00
Estructura metálica todo costo 1.0000 PA 30,000.00 25,423.73 4,576.27 25,423.73 4,576.27 30,000.00
COSTO/UD 47,881.35 8,618.64 56,500.00

Letrero de obra
Volumen Análisis 1.00 UND
Materiales y Equipos
Arte e impresión en vilnil y colocación 1.00 PA RD$22,457.63 RD$4,042.37 RD$22,457.63 RD$4,042.37
Estructura metálica todo costo 1.00 PA RD$25,423.73 RD$4,576.27 RD$25,423.73 RD$4,576.27
Total/UND RD$47,881.36 RD$8,618.64 RD$56,500.00

1.03 Fumigación área de fundaciones (tratamientos termitas subterráneas y comején)

1.04 Cerramiento de área en construcción, en madera y Aluzinc, con una puerta vehicular (h=6')

Pino amer. 1"x 4"x12' bruto (4 pt) 5.1236 PT 44.30 37.54 6.76 192.35 34.62 226.98
Pino amer. 2"x 4"x12' bruto (8 pt) 10.2473 PT 54.28 46.00 8.28 471.37 84.85 556.22
Zinc acanalado, 3'x6', cal. 26 4 usos (14 / 4) 12.0267 UD 620.21 525.60 94.61 6,321.24 1,137.82 7,459.06
Clavo corriente, metalizado c/cabeza 2 1/2 0.7685 LB 31.80 26.95 4.85 20.71 3.73 24.44
Clavo de zinc 2 1/2" + 5% desp. (.133 lb. / p 6.0133 LB 49.14 41.64 7.50 250.42 45.08 295.50
Excavación para postes 10.0000 UD 36.00 0.00 360.00 0.00 360.00
Concreto postes 10.0000 UD 44.00 0.00 440.00 0.00 440.00
Relleno reposición 10.0000 UD 18.00 0.00 180.00 0.00 180.00
COSTO/UD 8,236.09 1,306.10 9,542.19
COSTO/UD 823.61 130.61 954.22

1.05 Demolición losas H.A.

Mano de obra 1TC rend. 0.45mt3 1.0000 Mt³ 2,002.78 0.00 2,002.78 0.00 2,002.78
COSTO/UD 2,002.78 0.00 2,002.78

1.06 Bote material (incluye traslado y carguío).

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73


MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

1.07 Corte y bote de arboles.

1.08 Limpieza de terreno.

242.00 M2
Carretilla Surtek 5.5P3 (6 meses uso) 0.2000 UND 8,850.00 7,500.00 1,350.00 1,500.00 270.00 1,770.00
Pala cuadrada Tramontina 0.2000 UND 767.00 650.00 117.00 130.00 23.40 153.40
Pala de corte Tramontina 0.2000 UND 767.00 650.00 117.00 130.00 23.40 153.40
Pico 0.2000 UND 1,121.00 950.00 171.00 190.00 34.20 224.20
Bote de material (50%) 15.73 m3 RD$805.08 12,663.98 0.00 12,663.98
Ayudante de albañilería (Ay) 1.0000 DIA 1,058.75 1,058.75 0.00 1,058.75
Trabajador No calificado (TNC) 2.0000 Día 823.75 1,647.50 0.00 1,647.50
COSTO/UD 17,320.23 351.00 17,671.23
COSTO/MT² 71.57 1.45 73.02

LIMPIEZA ÁREA DE TRABAJO (A MANO) 1.00 M2 RD$71.57 RD$1.45 RD$73.02


INCLUYE BOTE
Estructura 11.00m x 22.00m
Volumen Análisis 242.00 M2
Materiales y Equipos
Carretilla Surtek 5.5P3 (6 meses uso) 0.20 UND RD$7,500.00 RD$1,350.00 RD$1,500.00 RD$270.00
Pala cuadrada Tramontina (6 meses uso) 0.20 UND RD$650.00 RD$117.00 RD$130.00 RD$23.40
Pala de corte Tramontina (6 meses uso) 0.20 UND RD$650.00 RD$117.00 RD$130.00 RD$23.40
Pico 0.20 UND RD$950.00 RD$171.00 RD$190.00 RD$34.20
Bote de material (50%) 15.73 m3 RD$805.08 RD$0.00 RD$12,663.98 RD$0.00
Mano de Obra RD$0.00
Ayudante 1.00 DIA RD$1,058.75 RD$0.00 RD$1,058.75 RD$0.00
Peon 2.00 DIA RD$823.75 RD$0.00 RD$1,647.50 RD$0.00
Total/UND RD$17,320.23 RD$351.00 RD$17,671.23

1.09 Replanteo con charrancha

242.0000 M2
Madera pino bruto americano 1"x4"x12 79.2000 P2 125.00 105.93 19.07 8,389.83 1,510.17 9,900.00
Madera pino bruto americano 2"x4"x12 158.4000 P2 125.00 105.93 19.07 16,779.66 3,020.34 19,800.00
Clavos dulce 2 1/2" 9.5000 LB 60.00 50.85 9.15 483.05 86.95 570.00
Cal 20 Kilos 6.0000 FDA 260.00 220.34 39.66 1,322.03 237.97 1,560.00
Hilo de gangorra 2.0000 U 169.00 143.22 25.78 286.44 51.56 338.00
Cinta métrica 0.1000 U 1,650.00 1,398.31 251.69 139.83 25.17 165.00
Brigada Topográfica 0.5000 DIA 17,700.00 15,000.00 2,700.00 7,500.00 1,350.00 8,850.00
Maestro 1.0000 DIA 2,471.25 2,471.25 0.00 2,471.25
Carpintero de Segunda Categoria 1.0000 DIA 1,058.75 1,058.75 0.00 1,058.75
Trabajador No calificado (TNC) 2.0000 Día 823.75 1,647.50 0.00 1,647.50
COSTO/UD 40,078.35 6,282.15 46,360.50
COSTO/MT² 165.61 25.96 191.57
Estructura 11.00m x 22.00m
Volumen Análisis 242.00 M2
Materiales y Equipos
Madera pino bruto americano 1"x4"x12 79.20 P2 RD$105.93 RD$19.07 RD$8,389.83 RD$1,510.34
Madera pino bruto americano 2"x4"x12 158.40 P2 RD$105.93 RD$19.07 RD$16,779.66 RD$3,020.69
Clavos dulce 2 1/2" 9.50 LB RD$50.85 RD$9.15 RD$483.05 RD$86.93
Cal 20 Kilos 6.00 FDA RD$220.34 RD$39.66 RD$1,322.03 RD$237.96
Hilo de gangorra 2.00 U RD$143.22 RD$25.78 RD$286.44 RD$51.56
Cinta métrica 0.10 U RD$1,398.31 RD$251.69 RD$139.83 RD$25.17
Brigada Topográfica 0.50 DIA RD$15,000.00 RD$2,700.00 RD$7,500.00 RD$1,350.00
Mano de Obra
Maestro 1.00 DIA RD$2,471.25 RD$0.00 RD$2,471.25 RD$0.00
Ayudante Carp. 1.00 DIA RD$1,058.75 RD$0.00 RD$1,058.75 RD$0.00
Peon 2.00 DIA RD$823.75 RD$0.00 RD$1,647.50 RD$0.00
Total/UND RD$40,078.34 RD$6,282.65 RD$46,360.99

2.000 Movimiento de Tierra

2.01 Excavación de material (incluye acopio de material) (a mano)

EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos

MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32

Sub-Total (3) Mano de Obra 449.32 0.00 449.32

COSTO/MT³ 456.93 1.37 458.30

2.02 Excavación de material a cielo abierto, con equipo

EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos

MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32

Sub-Total (3) Mano de Obra 449.32 0.00 449.32

COSTO/MT³ 456.93 1.37 458.30

2.03 Relleno de reposición compactado (con medio mecánicos) (con material existente excavado)

PALA "TRAMONTINA" 0.0100 UD 775.00 656.78 139.50 7.75 1.40 7.75


PICO "TRAMONTINA" 0.0100 UD 1,121.00 950.00 201.78 11.21 2.02 11.21
Regado, nivelado y apisonado de relleno 1.2000 m3 120.00 144.00 0.00 144.00
Herramientas (2%) 0.0200 P.A. 18.96 16.07 3.41 0.38 0.07 0.38
COSTO/MT³ 163.34 3.48 163.34

2.04 Relleno con material granular de mina para conformar explanación (incluye suministro de material, transporte, regado, mojado y compactado con equipo)

PALA "TRAMONTINA" 0.0100 UD 775.00 656.78 139.50 7.75 1.40 7.75


PICO "TRAMONTINA" 0.0100 UD 1,121.00 950.00 201.78 11.21 2.02 11.21
Regado, nivelado y apisonado de relleno 1.2000 m3 120.00 144.00 0.00 144.00
Herramientas (2%) 0.0200 P.A. 18.96 16.07 3.41 0.38 0.07 0.38
COSTO/MT³ 163.34 3.48 163.34

2.05 Bote material inservible (incluye traslado y carguío)

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73

MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

3.00 Hormigón Armado

A BAJO NIVEL DE PISO

3.01 Zapata de columnas C1 (0.90mx1.20mx0.40.m) (Acero inferior: 1/2"@0.15m A.D.) (Acero superior: 3/8"@0.25m) (Hormigón Industrial 280kg/cm2).

Acero - Cuantía QQ/M3 1.5958 QQ 3,800.00 3,220.34 579.66 5,139.12 925.04 6,064.16
Hormigon Industrial 240 Kg/cm2 + 10% desp 1.1000 M3 7,700.00 6,525.43 1,174.58 7,177.97 1,292.03 8,470.00
Alambre Dulce No. 18 3.1917 LB 100.00 84.74 15.25 270.47 48.68 319.15
Mano de Obra Acero 1.5958 qq 613.41 978.90 0.00 978.90
COSTO/MT³ 13,566.45 2,265.76 15,832.21

3.02 Zapata de columnas C2 (1.30mx1.20mx0.40m) (Acero inferior: 1/2"@0.15m A.D.) (Acero superior: 3/8"@0.25m) (Hormigón Industrial 280kg/cm2).

Acero - Cuantía QQ/M3 1.5958 QQ 3,800.00 3,220.34 579.66 5,139.12 925.04 6,064.16
Hormigon Industrial 240 Kg/cm2 + 10% desp 1.1000 M3 7,700.00 6,525.43 1,174.58 7,177.97 1,292.03 8,470.00
Alambre Dulce No. 18 3.1917 LB 100.00 84.74 15.25 270.47 48.68 319.15
Mano de Obra Acero 1.5958 qq 613.41 978.90 0.00 978.90
COSTO/MT³ 13,566.45 2,265.76 15,832.21

3.03 Zapatas de muros 15cm (0.45mx0.25m), acero long. 3ø3/8", ø3/8"@0.25m (Hormigón Industrial 280kg/cm2).

Acero - Cuantía QQ/M3 1.0307 QQ 3,800.00 3,220.34 579.66 3,319.11 597.44 3,916.55
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Alambre Dulce No. 18 2.0613 LB 100.00 84.74 15.25 174.68 31.44 206.13
Mano de Obra Acero 8.8889 ML 136.01 1,208.99 0.00 1,208.99
COSTO/MT³ 12,160.41 1,971.26 14,131.67

3.04 Viga de amarre 0.15mx0.20m B.N.P. (4ø3/8", est. 3/8"@0.20m). F'c=210kg/cm2

Acero - Cuantía QQ/M3 3.6600 QQ 3,800.00 3,220.34 579.66 11,786.44 2,121.56 13,908.00
Vaciado y ligado Hormigón 1:2:4 - 10% desp 1.1000 M3 6,116.15 5,183.18 932.97 5,701.50 1,026.27 6,727.77
Alambre Dulce No. 18 7.3200 LB 100.00 84.74 15.25 620.31 111.66 731.97
Mano de Obra Acero 33.3300 ML 136.01 4,533.26 0.00 4,533.26
Encofrado viga de amarre Todo Costo 33.3300 ML 371.07 12,367.70 0.00 12,367.70
COSTO/MT³ 22,641.51 3,259.48 38,268.70

3.05 Losa de piso e=0.10m armado con malla electrosoldada,15x15 (hormigón industrial 210kg/cm2) (incluye separadores).

Malla Electrosoldada D2.3 15x15mm + 10% 0.1100 ROLLO 15,500.00 13,135.59 2,364.41 1,444.92 260.08 1,705.00
Hormigón industrial 210Kg/cm2 - 10% desp 1.0500 M3 7,205.15 6,106.06 1,099.09 6,411.36 1,154.04 7,565.40
Madera cepillada pino americano 4.0000 p2 125.00 105.93 19.07 423.73 76.27 500.00
Alambre Dulce No. 18 0.1100 LB 100.00 84.74 15.25 9.32 1.68 11.00
Preparación superficie - Ayudante AY 0.1000 DIA 1,058.75 105.88 0.00 105.88
Mano de Obra colocación malla 10.0000 M2 48.14 481.40 0.00 481.40
COSTO/MT³ 8,876.60 1,492.08 10,368.67
COSTO/MT² 887.66 149.21 1,036.87

Malla Electrosoldada D2.3 15x15mm + 10%


desp. 0.11 ROLLO RD$13,135.59 RD$2,364.41 RD$1,444.92 RD$260.09 15,500.00

Hormigón industrial 210Kg/cm2 - 10% desp 1.10 M3 RD$7,205.15 RD$84.74 RD$7,925.66 RD$93.22 7,289.89
Madera cepillada pino americano 1.00 p2 RD$105.93 RD$19.07 RD$105.93 RD$19.07 125.00
Alambre Dulce No. 18 1.10 LB RD$93.22 RD$16.78 RD$102.54 RD$18.46 110.00
Preparación superficie - Ayudante AY 0.10 DIA RD$847.00 RD$0.00 RD$84.70 RD$0.00
Mano de Obra colocación malla 10.00 M2 RD$38.51 RD$0.00 RD$385.10 RD$0.00
Total/UND RD$10,048.85 RD$390.84 RD$10,439.69

B SOBRE NIVEL DE PISO

3.06 Columna C1(0.30mx0.30m) (8 de 3/4") (est. 3/8"@0.10m) (Hormigón Industrial 280kg/cm2).

Acero - Cuantía QQ/M3 7.4761 QQ 3,800.00 3,220.34 579.66 24,075.62 4,333.61 28,409.23
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Alambre Dulce No. 18 14.9522 LB 100.00 84.74 15.25 1,267.08 228.08 1,495.16
Mano de Obra Acero 7.4761 ML 136.01 1,016.84 0.00 1,016.84
Encofrado columna hasta 0.30m Todo Costo 44.4400 ML 429.66 19,094.00 0.00 19,094.00
COSTO/MT³ 52,911.17 5,904.06 58,815.23

Acero - Cuantía QQ/M3 7.48 QQ RD$3,220.34 RD$579.66 RD$24,075.62 RD$4,333.60


Hormigón Industrial - 10% desp 1.10 M3 RD$6,779.66 RD$1,220.34 RD$7,457.63 RD$1,342.37
Alambre Dulce No. 18 14.95 LB RD$84.75 RD$15.25 RD$1,267.14 RD$228.02
Mano de Obra
Mano de Obra Acero 7.48 QQ RD$588.67 RD$0.00 RD$4,400.96 RD$0.00
Encofrado columna hasta 0.30m Todo
Costo 44.44 ML RD$305.00 RD$0.00 RD$13,554.20 RD$0.00
Total/UND RD$50,755.55 RD$5,903.99 RD$56,659.54

3.07 Columna C2(0.30mx0.40m) (8 de 3/4") ( est. 3/8" @0.15) (altura completa) (incluye cepos) (Hormigón Industrial 250kg/cm2).

Acero - Cuantía QQ/M3 5.2482 QQ 3,800.00 3,220.34 579.66 16,900.84 3,042.15 19,943.00
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Alambre Dulce No. 18 10.4963 LB 100.00 84.74 15.25 889.48 160.11 1,049.59
Mano de Obra Acero 5.2482 ML 136.01 713.81 0.00 713.81
Encofrado columna hasta 0.30m Todo Costo 32.6531 ML 429.66 14,029.65 0.00 14,029.65
COSTO/MT³ 39,991.41 4,544.63 44,536.04

Acero - Cuantía QQ/M3 5.25 QQ RD$3,220.34 RD$579.66 RD$16,900.84 RD$3,042.15


Hormigón Industrial - 10% desp 1.10 M3 RD$6,779.66 RD$1,220.34 RD$7,457.63 RD$1,342.37
Alambre Dulce No. 18 10.50 LB RD$84.75 RD$15.25 RD$889.52 RD$160.07
Mano de Obra Acero 5.25 QQ RD$588.67 RD$0.00 RD$3,089.43 RD$0.00
Encofrado columna hasta 0.30m Todo 32.65 ML RD$305.00 RD$0.00 RD$9,959.18 RD$0.00
Costo
Total/UND RD$38,296.60 RD$4,544.59 RD$42,841.19

3.08 Dintel 15 x 20 cms, (acero inferior 3 de 1/2") (acero superior 2 de 3/8") (estribos 3/8"@0.20m) (Hormigón 210kg/cm2).

Acero - Cuantía QQ/M3 4.3303 QQ 3,800.00 3,220.34 579.66 13,945.19 2,510.13 16,455.32
Alambre No.18 8.6607 LBS 100.00 84.74 15.25 733.93 132.11 866.03
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 MT³ 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
M.O acero 26.6667 QQ 136.01 3,626.97 0.00 3,626.97
Encofrado dintel todo costo 26.6667 ML 526.68 14,044.73 0.00 14,044.73
COSTO/MT³ 39,808.44 3,984.61 43,793.06

Acero - Cuantía QQ/M3 4.33 QQ RD$3,220.34 RD$579.66 RD$13,945.19 RD$2,510.13


Hormigón Industrial 1.10 M3 RD$6,271.19 RD$1,128.81 RD$6,898.31 RD$1,241.69
Alambre Dulce No. 18 8.66 LB RD$84.75 RD$15.25 RD$733.96 RD$132.08
Mano de Obra
Mano de Obra Acero 26.67 ML RD$130.52 RD$0.00 RD$3,480.53 RD$0.00
Encofrado dintel todo costo 26.67 ML RD$525.00 RD$0.00 RD$14,000.00 RD$0.00
Total/UND RD$39,057.99 RD$3,883.90 RD$42,941.89

3.09 Viga V1 (0.30x0.40m) (acero inferior: 2 de 3/4") (acero superior: 4 de 1/2") (acero central : 2 de 3/8") (est. 3/8"@0.20m) (Hormigón Industrial 280kg/cm2).

Acero - Cuantía QQ/M3 3.6840 QQ 3,800.00 3,220.34 579.66 11,863.76 2,135.48 13,999.24
Alambre No.18 7.3680 LBS 100.00 84.74 15.25 624.38 112.39 736.77
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 MT³ 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
M.O acero 3.6840 QQ 613.41 2,259.80 0.00 2,259.80
Encofrado dintel todo costo 7.7778 ML 766.75 5,963.61 0.00 5,963.61
COSTO/MT³ 28,169.18 3,590.24 31,759.42

Acero - Cuantía QQ/M3 3.68 QQ RD$3,220.34 RD$579.66 RD$11,863.76 RD$2,135.47


Hormigón Industrial 1.10 M3 RD$6,779.66 RD$1,220.34 RD$7,457.63 RD$1,342.37
Alambre Dulce No. 18 7.37 LB RD$84.75 RD$15.25 RD$624.41 RD$112.36
Mano de Obra Acero 3.68 QQ RD$588.67 RD$0.00 RD$2,168.67 RD$0.00
Encofrado viga carga Todo Costo 7.78 ML RD$766.75 RD$0.00 RD$5,963.61 RD$0.00
Total/UND RD$28,078.08 RD$3,590.20 RD$31,668.28

3.1 Viga V2 (0.30mx0.45m) (acero inferior: 2 de 3/4") (acero superior: 4 de 1/2") (est. 3/8"@0.20m) (Hormigón Industrial 2580kg/cm2).

Acero - Cuantía QQ/M3 3.46 QQ 3,800.00 3,220.34 579.66 11,149.47 2,006.90 13,156.37
Alambre No.18 6.9244 LBS 100.00 84.74 15.25 586.79 105.62 692.41
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 MT³ 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
M.O acero 3.4622 QQ 613.41 2,123.74 0.00 2,123.74
Encofrado dintel todo costo 7.7778 ML 766.75 5,963.61 0.00 5,963.61
COSTO/MT³ 27,281.24 3,454.90 30,736.14

Acero - Cuantía QQ/M3 3.46 QQ RD$3,220.34 RD$579.66 RD$11,149.47 RD$2,006.90


Hormigón Industrial 1.10 M3 RD$6,779.66 RD$1,220.34 RD$7,457.63 RD$1,342.37
Alambre Dulce No. 18 6.92 LB RD$84.75 RD$15.25 RD$586.81 RD$105.60
Mano de Obra
Mano de Obra Acero 3.46 QQ RD$588.67 RD$0.00 RD$2,038.10 RD$0.00
Encofrado viga carga Todo Costo 7.78 ML RD$766.75 RD$0.00 RD$5,963.61 RD$0.00
Total/UND RD$27,195.62 RD$3,454.87 RD$30,650.49

3.11 Losa (e=0.15 m) en hormigón armado (acero grado 60, Ø3/8@ @ 0.20m) (Hormigón Industrial 280kg/cm2).

Acero - Cuantía QQ/M3 1.2800 QQ 3,800.00 3,220.34 579.66 4,122.03 741.97 4,864.00
Alambre No.18 2.5600 LBS 100.00 84.74 15.25 216.94 39.05 255.99
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 MT³ 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
M.O acero 1.2800 QQ 613.41 785.16 0.00 785.16
Encofrado dintel todo costo 6.6667 ML 766.75 5,111.67 0.00 5,111.67
COSTO/MT³ 17,693.43 2,123.39 19,816.82

Acero - Cuantía QQ/M3 1.28 QQ RD$3,220.34 RD$579.66 RD$4,122.03 RD$741.96


Hormigón Industrial 280Kg/cm2 - 10% desp 1.10 M3 RD$6,779.66 RD$1,220.34 RD$7,457.63 RD$1,342.37
Alambre Dulce No. 18 2.56 LB RD$84.75 RD$15.25 RD$216.95 RD$39.04
Mano de Obra
Mano de Obra Acero 1.28 QQ RD$588.67 RD$0.00 RD$753.50 RD$0.00
Encofrado losa plana h=3.00m Todo Costo 6.67 M2 RD$730.00 RD$0.00 RD$4,866.67 RD$0.00
Total/UND RD$17,416.78 RD$2,123.37 RD$19,540.15

4.00 Muros de Bloques

4.01 Construcción de muros de bloques de hormigón de 6" (industrial), bastones ø3/8"@0.40m (con todos los huecos llenos)

bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 3/8" x 20' -G40 0.0420 QQ 3,800.00 3,220.34 579.66 135.25 24.35 159.60
alambre dulce #18 0.0840 Lbs 100.00 84.74 15.25 7.12 1.28 8.40
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 Kg/cms2 (1:3:5) 0.0590 m3 6,116.15 5,183.18 932.97 305.81 55.05 360.85
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.40 mts 13.0000 Ud 2.10 1.78 0.32 23.16 4.17 27.33
Andamios 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Herramientas (2%) 0.0200 P.A. 734.50 622.46 112.04 12.45 2.24 14.69
COSTO/MT² 1,596.98 214.06 1,811.04

Suministro bloques horm. +4% desp. 13.00 UND RD$38.14 RD$6.86 RD$495.76 RD$89.18
Hormigón 1:3:5 en cámaras +10% desp. 0.0688 M3 RD$5,721.68 RD$0.00 RD$393.37 RD$0.00
Mortero 1:3 en juntas + 30% desp. 0.0250 M3 RD$6,132.22 RD$0.00 RD$153.31 RD$0.00
Acero bastones 3/8" + 20% desp. 0.0518 QQ RD$3,220.34 RD$579.66 RD$166.81 RD$30.03
Alambre Dulce No. 18 para amarrar bastone 0.0780 LB RD$93.22 RD$16.78 RD$7.27 RD$1.31
Andamios 1.00 M2 RD$50.24 RD$84.74 RD$50.24 RD$84.74
Mano de Obra
Colocación bloques 13.00 UND RD$17.02 RD$0.00 RD$221.26 RD$0.00
Llenado de huecos @ 0.20 m 13.00 UND RD$7.88 RD$0.00 RD$102.44 RD$0.00
Corte y amarre varillas @ 0.40 m 13.00 UND RD$2.12 RD$0.00 RD$27.56 RD$0.00
Total/UND RD$1,618.02 RD$205.26 RD$1,823.28

4.02 Construcción de muros de bloques de hormigón de 6" (industrial), bastones ø3/8"@0.60m; Acero horizontal 2ø3/8"@0.60m . S.N.P.

bloques de 0.15 mts (6") TAVARES INDUSTRI 13.0000 Ud 44.00 37.29 6.71 484.75 87.25 572.00
acero 3/8" x 20' -G40 0.1184 QQ 3,800.00 3,220.34 579.66 381.27 68.63 449.90
alambre dulce #18 0.1590 Lbs 100.00 84.74 15.25 13.47 2.43 15.90
mezcla 1:3 0.0250 m3 6,993.84 5,926.98 1,066.86 148.17 26.67 174.85
Hormigón 140 Kg/cms2 (1:3:5) 0.0367 m3 6,116.15 5,183.18 932.97 190.05 34.21 224.26
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.40 mts 13.0000 Ud 2.10 27.33 0.00 27.33
Andamios 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Herramientas (2%) 0.0200 P.A. 1,037.80 879.49 158.31 17.59 3.17 20.76
COSTO/MT² 1,723.86 231.98 1,955.84

Suministro bloques horm. +4% desp. 13.00 UND RD$38.14 RD$6.86 RD$495.76 RD$89.18 584.94
Acero bastones 3/8" + 20% desp. 0.1184 QQ RD$3,220.34 RD$579.66 RD$381.27 RD$68.63 449.90
Alambre Dulce No. 18 para amarrar bastone 0.1590 LB RD$93.22 RD$16.78 RD$14.82 RD$2.67 17.49
Mortero 1:3 en juntas + 30% desp. 0.0250 M3 RD$6,132.22 RD$37.29 RD$153.31 RD$0.93 154.24
Hormigón 1:3:5 en cámaras +10% desp. 0.0367 M3 RD$5,721.68 RD$0.00 RD$209.79 RD$0.00 209.79
Colocación bloques 13.00 UND RD$17.02 RD$0.00 RD$221.26 RD$0.00 221.26
Llenado de huecos @ 0.60 m 13.00 UND RD$3.13 RD$0.00 RD$40.69 RD$0.00 40.69
Corte y amarre varillas @ 0.60 m 13.00 UND RD$4.71 RD$0.00 RD$61.23 RD$0.00 61.23
Andamios 1.00 M2 RD$50.24 RD$50.24 RD$0.00 50.24
Total/UND RD$1,628.37 RD$161.41 RD$1,789.78

4.03 Antepecho con bloques de hormigón de 6" (incluyendo pañete y cantos terminado), H=0.40m

Muro de bloques de 15 cms Ø3/8" @ 0.60 0.4000 m2 1,892.75 1,604.03 288.72 641.61 115.49 757.10
Pañete maestreado y a plomo 0.9500 m2 422.50 358.05 64.45 340.15 61.23 401.38
Cantos 3.0000 ml 205.79 174.40 31.39 523.20 94.18 617.37
Mano de Obra Subida materiales - Ayudant 0.0500 dia 1,058.75 52.94 0.00 52.94
COSTO/MT² 1,557.90 270.89 1,828.79

Muro de bloques de 15 cms Ø3/8" @ 0.60 0.40 m2 RD$1,323.49 RD$171.78 RD$529.40 RD$68.71
m
Pañete maestreado y a plomo 0.95 m2 RD$399.62 RD$29.02 RD$379.64 RD$27.57
Cantos 3.00 ml RD$203.06 RD$21.28 RD$609.18 RD$63.84
Mano de obra
Mano de Obra Subida materiales - 0.05 dia RD$1,058.75 RD$0.00 RD$52.94 RD$0.00
Ayudante AY
Total/UND 1,571.16 160.12 1,731.28

5.00 Terminación de Superficies

5.01 Fraguache

Escoba 0.0100 U 15.00 12.71 2.29 0.13 0.02 0.15


mezcla 1:6 0.0080 m3 4,712.52 3,993.66 718.86 31.95 5.75 37.70
fraguache con escoba 1.0000 m2 28.41 28.41 0.00 28.41
Andamios 1.0000 m2 63.09 53.47 9.62 53.47 9.62 63.09
Herramientas (2%) 0.0200 P.A. 37.85 32.08 5.77 0.64 0.12 0.76
COSTO/MT² 114.59 15.51 130.10

Mortero 1:4 de empañete 1.50mm + 50% de 0.0020 M3 RD$6,467.18 RD$1,089.88 RD$12.93 RD$2.18
Regla madera americana cepillada 1"x4" / 2 0.1667 PT RD$105.93 RD$19.07 RD$17.66 RD$3.18
Mano de Obra
Mano de obra fraguache 1.00 M2 RD$45.19 RD$0.00 RD$45.19 RD$0.00
Total/UND RD$75.78 RD$5.36 RD$81.14

5.02 Pañete maestreado en muros exteriores (con mortero 1:4)

Mortero 1:4 de empañete 1.75cm + 25% des 0.0250 M3 6,312.04 5,349.18 962.85 133.73 24.07 157.80
Regla madera americana cepillada 1"x4" / 2 0.1667 PT 125.00 105.93 19.07 17.66 3.18 20.84
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra empañete exterior 1.0000 M2 238.09 238.09 0.00 238.09
COSTO/MT² 442.95 36.87 479.82

Mortero 1:4 de empañete 1.75cm + 25% des 0.0250 M3 RD$6,467.18 RD$1,089.88 RD$161.68 RD$27.25
Regla madera americana cepillada 1"x4" / 2 0.1667 PT RD$105.93 RD$19.07 RD$17.66 RD$3.18
Andamios en madera 1.00 M2 RD$50.24 RD$1.97 RD$50.24 RD$1.97
Mano de Obra
Mano de obra empañete exterior 1.00 M2 RD$241.94 RD$0.00 RD$241.94 RD$0.00
Total/UND RD$471.52 RD$32.40 RD$503.92
5.03 Pañete maestreado en muros interiores (con mortero 1:4)

Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 6,312.04 5,349.18 962.85 117.15 21.09 138.23
Regla madera americana cepillada 1"x4" / 2 0.1667 PT 125.00 105.93 19.07 17.66 3.18 20.84
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra empañete exterior 1.0000 M2 187.07 187.07 0.00 187.07
COSTO/MT² 375.34 33.89 409.23

Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 RD$6,467.18 RD$1,089.88 RD$141.63 RD$23.87
Regla madera americana cepillada 1"x4" / 2 0.1667 PT RD$105.93 RD$19.07 RD$17.66 RD$3.18
Andamios en madera 1.00 M2 RD$50.24 RD$9.04 RD$50.24 RD$9.04
Mano de Obra
Mano de obra empañete interior 1.00 M2 RD$190.09 RD$0.00 RD$190.09 RD$0.00
Total/UND RD$399.62 RD$36.09 RD$435.71

5.04 Pañete maestreado en vigas y techos (con mortero 1:4)

Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 6,312.04 5,349.18 962.85 117.15 21.09 138.23
Regla madera americana cepillada 1"x4" / 2 0.1667 PT 125.00 105.93 19.07 17.66 3.18 20.84
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra empañete exterior 1.0000 M2 270.64 270.64 0.00 270.64
COSTO/MT² 458.91 33.89 492.80

Empañete en muro maestreado


techos/vigas
Volumen Análisis 1.00 M2
Materiales y Equipos
Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 RD$6,467.18 RD$1,089.88 RD$141.63 RD$23.87
Regla madera americana cepillada 1"x4" / 2 0.1667 PT RD$105.93 RD$19.07 RD$17.66 RD$3.18
Andamios en madera 1.00 M2 RD$50.24 RD$1.97 RD$50.24 RD$1.97
Mano de Obra
Mano de obra empañete techos y vigas 1.00 M2 RD$246.44 RD$0.00 RD$246.44 RD$0.00
Total/UND RD$455.97 RD$29.02 RD$484.99

5.05 Pañete maestreado columnas aisladas (con mortero 1:4)

Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 6,312.04 5,349.18 962.85 117.15 21.09 138.23
Regla madera americana cepillada 1"x4" / 2 0.1667 PT 125.00 105.93 19.07 17.66 3.18 20.84
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra empañete exterior 1.0000 M2 349.20 349.20 0.00 349.20
COSTO/MT² 537.47 33.89 571.36

Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 RD$6,467.18 RD$1,089.88 RD$141.63 RD$23.87
Regla madera americana cepillada 1"x4" / 2 0.1667 PT RD$105.93 RD$19.07 RD$17.66 RD$3.18
Andamios en madera 1.00 M2 RD$50.24 RD$1.97 RD$50.24 RD$1.97
Mano de Obra
Mano de obra empañete columnas 1.00 M2 RD$354.91 RD$0.00 RD$354.91 RD$0.00
Total/UND RD$564.44 RD$29.02 RD$593.46

5.06 Cantos

madera pino americano cepillada 0.8300 P2 125.00 105.93 19.07 87.92 15.83 103.75
mezcla 1:1.5:5 (pañete) 0.0050 m3 3,457.52 2,930.10 527.42 14.65 2.64 17.29
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 121.04 102.57 18.46 2.05 0.37 2.42
COSTO/ML 186.96 18.83 205.79

Mortero 1:4 para empañete + 10% desp. 0.0050 M3 RD$6,467.18 RD$1,089.88 RD$32.34 RD$5.45
Regla madera americana cepillada 1"x4" / 4 0.83 PT RD$105.93 RD$19.07 RD$87.92 RD$15.83
Mano de Obra
Mano de obra canto 1.00 ML RD$82.80 RD$0.00 RD$82.80 RD$0.00
Total/UND RD$203.06 RD$21.28 RD$224.34

5.07 Gotero colgante

Mortero 1:4 para empañete + 30% desp. 0.0200 M3 6,312.04 5,349.18 962.85 106.98 19.26 126.24
Regla madera americana cepillada 1"x4" / 1 0.3300 PT 125.00 105.93 19.07 34.96 6.29 41.25
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra goteros colgantes 1.0000 M2 190.00 190.00 0.00 190.00
COSTO/ML 385.41 35.17 420.58

Mortero 1:4 para empañete + 30% desp. 0.0200 M3 RD$6,467.18 RD$1,089.88 RD$129.34 RD$21.80
Regla madera americana cepillada 1"x4" / 1 0.33 PT RD$105.93 RD$19.07 RD$34.96 RD$6.29
Andamios en madera 1.00 M2 RD$50.24 RD$1.97 RD$50.24 RD$1.97
Mano de Obra
Mano de obra goteros colgantes 1.00 M2 RD$191.07 RD$0.00 RD$191.07 RD$0.00
Total/UND RD$405.61 RD$30.06 RD$435.67

6.00 Terminación de Pisos

6.01 Suministro e instalación de baldosas de granito para pisos, fondo blanco (0.40mx0.40m), derretido blanco, (pulido, brillado y cristalizado); juntas de 2mm.

Granito 40x40 fondo blanco + 10% desp. 1.0500 M2 1,200.00 1,016.95 183.05 1,067.80 192.20 1,260.00
Derretido Cemento Blanco (100 LBS) 0.0700 Fds 1,500.00 1,271.19 228.81 88.98 16.02 105.00
Mortero 1:10 pisos + 10% desp. 0.0320 m3 4,927.88 4,176.17 751.71 133.64 24.05 157.69
Estopa 0.0500 LB 125.00 105.93 19.07 5.30 0.95 6.25
Pulido y cristalizado de pisos 1.0000 M2 350.00 350.00 0.00 350.00
Colocacion Piso De Mosaicos De Granito 1.0000 m2 373.74 373.74 0.00 373.74
Corte De Chazos 3.0000 Ud 25.00 75.00 0.00 75.00
MO derretido pisos 1.0000 m2 15.45 15.45 0.00 15.45
Herramientas (2%) 0.0200 P.A. 1,522.69 1,290.42 232.28 25.81 4.65 30.45
COSTO/M2 2,135.71 237.87 2,373.59

Mortero 1:10 pisos + 10% desp. 0.03 M3 RD$4,375.86 RD$713.46 RD$151.62 RD$24.72
Granito 30x30 fondo blanco + 10% desp. 1.10 M2 RD$1,016.95 RD$183.05 RD$1,118.64 RD$201.36
Derretido Keracolor 25 lbs + 10% desp. 0.045 FDA RD$1,271.19 RD$228.81 RD$57.20 RD$10.30
Estopa 0.05 LB RD$105.93 RD$19.07 RD$5.30 RD$0.95
Pulido y cristalizado de pisos 1.00 M2 RD$296.61 RD$53.39 RD$296.61 RD$53.39
Corte de Chazos Granito 1.00 m2 RD$21.19 RD$3.81 RD$21.19 RD$3.81
Transporte de pisos (3%) 1.00 PA RD$39.60 RD$0.00 RD$39.60 RD$0.00
Mano de obra
Mano de Obra de colocación de Granito 1.00 M2 RD$375.53 RD$0.00 RD$375.53 RD$0.00
Total/UND RD$2,065.69 RD$294.53 RD$2,360.22

6.02 Suministro y colocación de zócalos de granito fondo blanco (0.40mx0.07m) con derretido blanco, cristalizado; juntas de 2mm.

Granito 40x40 fondo blanco + 10% desp. 0.2000 M2 1,200.00 1,016.95 183.05 203.39 36.61 240.00
Mortero 1:10 pisos + 10% desp. 0.0020 m3 4,927.88 4,176.17 751.71 8.35 1.50 9.86
derretido cemento blanco (100 LBS) 0.0300 FDS 1,500.00 1,271.19 228.81 38.14 6.86 45.00
Estopa 0.0030 LB 125.00 105.93 19.07 0.32 0.06 0.38
Corte De Chazos 3.0000 Ud 25.00 75.00 0.00 75.00
colocación zócalos 1.0000 ML 143.28 143.28 0.00 143.28
Herramientas (2%) 0.0200 P.A. 370.23 313.75 56.48 6.28 1.13 7.40
COSTO/ML 474.75 46.16 520.91

Mortero 1:10 pisos + 10% desp. 0.0020 M3 RD$4,375.86 RD$713.46 RD$8.75 RD$1.43
Granito 30x30 fondo blanco + 10% desp. 0.20 M2 RD$1,016.95 RD$183.05 RD$203.39 RD$36.61
Derretido Keracolor 25 lbs + 10% desp. 0.003 FDA RD$1,271.19 RD$228.81 RD$3.81 RD$0.69
Estopa 0.003 LB RD$105.93 RD$19.07 RD$0.32 RD$0.06
Corte de Chazos Granito 1.00 M2 RD$21.19 RD$3.81 RD$21.19 RD$3.81
Transporte de pisos (3%) 1.00 PA RD$7.20 RD$0.00 RD$7.20 RD$0.00
Mano de obra
Mano de Obra de colocación zócalos 1.00 ML RD$130.82 RD$0.00 RD$130.82 RD$0.00
Total/UND RD$375.48 RD$42.60 RD$418.08

6.03 Suministro y colocación de piso de porcelanato de alto tránsito, antideslizante, todo masa, espesor 8mm, formato 0.60mx0.60m o 0.40mx0.40m, rectificada, procedencia europea

Piso de porcelanato de alto tránsito, antide 1.2000 M2 2,000.00 1,694.92 305.08 2,033.90 366.10 2,400.00
Mortero 1:10 pisos + 10% desp. 0.0300 m3 4,927.88 4,176.17 751.71 125.28 22.55 147.84
derretido cemento blanco (100 LBS) 0.0450 FDS 1,500.00 1,271.19 228.81 57.20 10.30 67.50
Estopa 0.0500 LB 125.00 105.93 19.07 5.30 0.95 6.25
Corte De Chazos de porcelanato 2.5000 Ud 25.00 62.50 0.00 62.50
colocación piso porcelanato 1.0000 M2 716.38 716.38 0.00 716.38
Herramientas (2%) 0.0200 P.A. 2,684.09 2,274.65 409.44 45.49 8.19 53.68
COSTO/ML 3,046.05 408.09 3,454.14

Mortero 1:10 pisos + 10% desp. 0.03 M3 RD$4,375.86 RD$713.46 RD$151.62 RD$24.72
Porcelanato Romano +20% desp. 1.20 M2 RD$1,694.92 RD$305.08 RD$2,033.90 RD$366.10
Derretido Keracolor 25 lbs + 10% desp. 0.045 FDA RD$1,271.19 RD$228.81 RD$57.20 RD$10.30
Estopa 0.05 LB RD$105.93 RD$19.07 RD$5.30 RD$0.95
Corte de Chazos Porcelanato 2.50 UND RD$21.19 RD$3.81 RD$52.97 RD$9.53
Transporte de pisos (3%) 1.00 M2 RD$72.00 RD$0.00 RD$72.00 RD$0.00
Mano de obra
Mano de Obra de colocación de
Porcelanato 1.00 M2 RD$625.79 RD$0.00 RD$625.79 RD$0.00
Total/UND RD$2,998.78 RD$411.60 RD$3,410.38

7.00 Plafones

7.01 Suministro y colocación de plafón vinyl-yeso 2'x2', color blanco


8.00 Revestimientos

8.01 Suministro y colocación revestimiento de porcelanato (0.30mx0.60m), rectificada (colocación junta trabada), color a especificar, procedencia europea

Cerámica + 10% desperdicio 1.1500 M2 1,600.00 1,355.93 244.07 1,559.32 280.68 1,840.00
Pegamento de cerámica Pegatod 0.2500 FDA 522.00 442.37 79.63 110.59 19.91 130.50
Cemento gris 0.0500 FDA 480.00 406.78 73.22 20.34 3.66 24.00
Derretido Keracolor 25 lbs + 10% desp. 0.0050 FDA 1,500.00 1,271.19 228.81 6.36 1.14 7.50
Estopa 0.0500 LB 125.00 105.93 19.07 5.30 0.95 6.25
Corte de Chazos 1.0000 m2 25.00 21.19 3.81 21.19 3.81 25.00
Separadores de cerámica 0.0500 FDA 285.00 241.53 43.47 12.08 2.17 14.25
Mano de Obra de colocación de Cerámica 1.0000 M2 716.38 607.10 109.28 607.10 109.28 716.38
COSTO/ML 2,342.27 421.61 2,763.88

Cerámica + 10% desperdicio 1.15 M2 RD$1,355.93 RD$244.07 RD$1,559.32 RD$280.68


Pegamento de cerámica Pegatod 0.25 FDA RD$326.27 RD$58.73 RD$81.57 RD$14.68
Cemento gris 0.05 FDA RD$381.36 RD$68.64 RD$19.07 RD$3.43
Derretido Keracolor 25 lbs + 10% desp. 0.005 FDA RD$1,271.19 RD$228.81 RD$6.36 RD$1.14
Estopa 0.05 LB RD$105.93 RD$19.07 RD$5.30 RD$0.95
Corte de Chazos 1.00 m2 RD$21.19 RD$3.81 RD$21.19 RD$3.81
Separadores de cerámica 0.05 FDA RD$241.53 RD$43.47 RD$12.08 RD$2.17
Transporte de cerámicas (3%) 1.00 PA RD$55.20 RD$0.00 RD$55.20 RD$0.00
Mano de obra
Mano de Obra de colocación de Cerámica 1.00 M2 RD$719.62 RD$0.00 RD$719.62 RD$0.00
Total/UND RD$2,479.71 RD$306.86 RD$2,786.57

8.02 Suministro e instalación de cantos plástico (color semejante a cerámica) en esquinas cerámicas.

9.00 Pintura

9.01 Imprimador (primer) acrílico de alto desempeño, 100% látex acrílico, resistente a la alcalinidad y a la eflorescencia. Incluye preparación de superficie

Imprimador (primer) acrílico de alto desem 0.0800 GLS 650.00 550.85 99.15 44.07 7.93 52.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 137.00 116.10 20.90 2.32 0.42 2.74
COSTO/MT² 187.23 19.79 207.02

Suministro pintura 0.08 GL RD$550.85 RD$99.15 RD$41.31 RD$7.44


Mano de Obra
Preparación de superficie y aplicación 1 ma 1.00 M2 RD$39.40 RD$0.00 RD$39.40 RD$0.00
Desperdicios, retoques y material gastable 1.00 PA RD$17.63 RD$0.00 RD$17.63 RD$0.00
Total/UND RD$98.34 RD$7.44 RD$105.78
9.02 Suministro y aplicación de pintura acrílica en interiores, calidad superior (dos capas) (incluye preparación de superficie) (para techos)

pintura acrílica 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Andmios - Guidolas 0.5000 M2 63.09 53.47 9.62 26.73 4.81 31.55
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 272.74 35.18 307.93

Pintura acrílica superior Int/ext andamios


Volumen Análisis 1.00 M2
Materiales y Equipos
Suministro pintura 0.08 GL RD$1,271.19 RD$228.81 RD$101.69 RD$18.30
Andmios - Guidolas 0.50 M2 RD$101.69 RD$18.31 RD$50.85 RD$9.16
Mano de Obra
Preparación de superficie y aplicación 2 ma 1.00 M2 RD$65.66 RD$0.00 RD$65.66 RD$0.00
Desperdicios, retoques y material gastable 1.00 PA RD$49.13 RD$0.00 RD$49.13 RD$0.00
Total/UND RD$267.33 RD$27.46 RD$294.79

9.03 Suministro y aplicación de pintura acrílica en exteriores, calidad superior (dos capas) (incluye preparación de superficie)

pintura acrílica 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38

Pintura acrílica superior Int/ext


Volumen Análisis 1.00 M2
Materiales y Equipos
Suministro pintura 0.08 GL RD$1,500.00 RD$270.00 RD$120.00 RD$21.60
Mano de Obra
Preparación de superficie y aplicación 2 ma 1.00 M2 RD$65.66 RD$0.00 RD$65.66 RD$0.00
Desperdicios, retoques y material gastable 1.00 PA RD$41.45 RD$0.00 RD$41.45 RD$0.00
Total/UND RD$227.11 RD$21.60 RD$248.71

9.04 Suministro y aplicación de pintura hospitalaria antibacterial y antimicrobiana, acabado semigloss, calidad superior (dos capas) (incluye preparación de superficie) (autoprimer y pintura) (99.9% de efectividad)

pintura hospitalaria antibacterial y antimic 0.0800 GLS 1,900.00 1,610.17 289.83 128.81 23.19 152.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 237.00 200.85 36.15 4.02 0.72 4.74
COSTO/MT² 273.67 35.35 309.02

Pintura acrílica contractor Int/ext


Volumen Análisis 1.00 M2
Materiales y Equipos
Suministro pintura 0.08 GL RD$1,610.17 RD$289.83 RD$128.81 RD$23.19
Mano de Obra
Preparación de superficie y aplicación 2 ma 1.00 M2 RD$65.66 RD$0.00 RD$65.66 RD$0.00
Desperdicios, retoques y material gastable 1.00 PA RD$43.53 RD$0.00 RD$43.53 RD$0.00
Total/UND RD$238.00 RD$23.19 RD$261.19

10.00 Puertas y Ventanas

A Puertas de Acero Inoxidable

10.01 Suministro e instalación de puerta doble (2.00x2.10)m de acero inoxidable grado 316, calibre 19, satinada, cerradura de acero inoxidable, con visor en vidrio laminado de seguridad de 6mm 0.20mx0.55m,
reforzada en área de choque de camillas, con placa de empuje, instalada con cierre oculto en marco superior europea/americana y pivot en piso, con cierre hermético y felpa, garantía de 5 años. Entrada camillas.

B Puertas de Polimetal

10.02 Suministro e instalación puerta de polimetal (P-4) de 1.00m x 2.10m de altura, lisa color blanco, llavín tipo palanca de acero inoxidable, con rejilla para ventilación 0.30mx0.30m (ambos lados de puerta), con
brazo hidráulico en cada hoja y tope fijo en puerta garantía de 5 años
C Ventanas

10.03 Suministro e instalación de ventana corredera en aluminio P-92, con marcos de aluminio de 1 1/2, vidrio con laminado de seguridad de 6mm y operadores de palanca en los extremos, marcos color blanco

10.04 Suministro e instalación de vidrio fijo en aluminio P-92, con marcos de aluminio de 1 1/2, vidrio con laminado de seguridad de 6mm, marcos color blanco

10.05 Suministro y colocación de laminado de protección solar (transmisión de luz visible 5%) (medidas por áreas de vidrio)

11.000 Instalaciones Sanitarias (Suministro e instalación)

11.01 Suministro e instalación lavamanos de porcelana sanitaria antibacterial completo, con pedestal, tamaño de mínimo de 54cmx47cm, con mezcladora push temporizado (de latón cromado, resistente a corrosión)
(cierre 15±5s, caudal: 6 l/min regulable) incluye salidas de agua potable y drenaje,

niple niquelado 3/8" x 2½" 2.0000 UD 45.00 38.14 6.86 76.27 13.73 90.00
reducción bushing de ½" A 3/8" HG. 2.0000 UD 29.66 25.14 4.52 50.27 9.05 59.32
sifón drenaje 1½" 1.0000 UD 192.29 162.96 29.33 162.96 29.33 192.29
boquilla para lavamanos 1.0000 UD 700.00 593.22 106.78 593.22 106.78 700.00
cubrefalta niquelado de 3/8" 2.0000 UD 18.00 15.25 2.75 30.51 5.49 36.00
llave ANGULAR de 3/8" 2.0000 UD 244.86 207.51 37.35 415.02 74.70 489.72
tubo flexible plástico 2.0000 UD 127.57 108.11 19.46 216.22 38.92 255.14
mezcladora 1.0000 UD 1,963.25 1,663.77 299.48 1,663.77 299.48 1,963.25
tarugos plásticoS 3/8" 4.0000 UD 15.00 12.71 2.29 50.85 9.15 60.00
tornillo 3" x 14 4.0000 UD 42.83 36.30 6.53 145.19 26.13 171.32
Manguera flexible lavamanos inox. 3/8" Ea 2.0000 UND 230.00 194.92 35.08 389.83 70.17 460.00
lavamanos de porcelana sanitaria antibacter 1.0000 UD 3,725.00 3,156.78 568.22 3,156.78 568.22 3,725.00
Instalación lavamanos empotrados en mese 1.0000 UD 2,247.21 2,247.21 0.00 2,247.21
COSTO/UD 9,198.09 1,251.16 10,449.25

Lavamanos pedestal Bath Collection +


salidas sanitarias
Volumen Análisis 1.00 UND
Materiales y Equipos
Niple Cromado 1/2" x 3" 2.00 UND RD$38.14 RD$6.87 RD$76.28 RD$13.74
Cubrefalta cromado 1/2" 2.00 UND RD$11.86 RD$2.13 RD$23.72 RD$4.26
Llave Angular 1/2" a 3/8" 2.00 UND RD$142.16 RD$25.59 RD$284.32 RD$51.18
Manguera flexible lavamanos inox. 3/8" Ea 2.00 UND RD$194.92 RD$35.09 RD$389.84 RD$70.18
Lavamanos de pedestal Bath Collection 1.00 UND RD$3,156.78 RD$568.22 RD$3,156.78 RD$568.22
Mezcladora Pfister lavamanos 1.00 UND RD$1,070.34 RD$192.66 RD$1,070.34 RD$192.66
Boquilla para lavamanos autom. push butto 1.00 UND RD$592.37 RD$106.63 RD$592.37 RD$106.63
Cola Extensora 1-1/4" PVC 1.00 UND RD$20.25 RD$3.65 RD$20.25 RD$3.65
Sifón 1-1/4" PVC 1.00 UND RD$101.25 RD$18.23 RD$101.25 RD$18.23
Reducción 2" a 1-1/4" PVC drenaje 1.00 UND RD$18.52 RD$3.33 RD$18.52 RD$3.33
Cemento blanco 0.05 FDA RD$642.37 RD$115.63 RD$32.12 RD$5.78
Teflón 0.25 UND RD$14.41 RD$2.59 RD$3.60 RD$0.65
Salida Agua Potable 1/2" Poliestileno 18mm 2.00 UND RD$1,631.14 RD$85.37 RD$3,262.28 RD$170.74
Salida Sanitaria A.N. 2" Aérea 1.00 UND RD$1,435.58 RD$68.09 RD$1,435.58 RD$68.09
Mano de obra
Mano de Obra Instalación lavamanos 1.00 UND RD$2,247.21 RD$0.00 RD$2,247.21 RD$0.00
Total/UND RD$12,714.46 RD$1,277.34 RD$13,991.80

Suministro e instalación de inodoro elongado de porcelana sanitaria antibacterial completo, one piece de tanque, pulsador palanca, tamaño mínimo (76x44x75)cm de bajo consumo y que cumplan con los
11.02 requerimientos para accesibilidad, color blanco, c/asiento y tapa, incluye salida de agua y de drenaje

Inodoro Bath Collection Bco. con tapa 1.0000 UND 9,895.00 8,385.59 1,509.41 8,385.59 1,509.41 9,895.00
niple niquelado 3/8" x 2½" 1.0000 UD 45.00 38.14 6.86 38.14 6.86 45.00
reducción bushing de ½" A 3/8" HG. 1.0000 UD 29.66 25.14 4.52 25.14 4.52 29.66
arandela sanitaria PVC de 3 ó 4" 1.0000 UD 99.04 83.93 15.11 83.93 15.11 99.04
cubrefalta niquelado de 3/8" 1.0000 UD 18.00 15.25 2.75 15.25 2.75 18.00
junta de CERA 1.0000 UD 99.59 84.40 15.19 84.40 15.19 99.59
llave ANGULAR de 3/8" 1.0000 UD 244.86 207.51 37.35 207.51 37.35 244.86
tubo flexible plástico 1.0000 UD 127.57 108.11 19.46 108.11 19.46 127.57
tornillos para inodoros 2.0000 UD 42.83 36.30 6.53 72.59 13.07 85.66
Tubo de Silicon industrial trasnp. 10.3 0.3000 UD 450.00 381.36 68.64 114.41 20.59 135.00
Teflon 3/4'' 0.5000 UD 22.94 19.44 3.50 9.72 1.75 11.47
Salida Agua Potable 1/2" Poliestileno 18mm 1.0000 UND 1,716.51 1,454.67 261.84 1,454.67 261.84 1,716.51
Salida Sanitaria A.N. 4" Inodoro Aérea 1.0000 UND 2,187.15 1,853.52 333.63 1,853.52 333.63 2,187.15
montura inodoros de una pieza 1.0000 UD 1,283.75 1,087.92 195.83 1,087.92 195.83 1,283.75
COSTO/UD 5,155.31 927.95 15,978.26

Inodoro Bath Collection Bco con tapa +


salida 1/2
Volumen Análisis 1.00 UND
Materiales y Equipos
Niple Cromado 1/2" x 3" 1.00 UND RD$38.14 RD$6.87 RD$38.14 RD$6.87
Cubrefalta cromado 1/2" 1.00 UND RD$11.86 RD$2.13 RD$11.86 RD$2.13
Llave Angular 1/2" a 3/8" 1.00 UND RD$142.16 RD$25.59 RD$142.16 RD$25.59
Manguera flexible inodoro inox. 3/8" Eastm 1.00 UND RD$182.20 RD$32.80 RD$182.20 RD$32.80
Inodoro Bath Collection Bco. con tapa 1.00 UND RD$8,384.75 RD$1,509.26 RD$8,384.75 RD$1,509.26
Junta de Cera 1.00 UND RD$66.22 RD$11.92 RD$66.22 RD$11.92
Arandela PVC 4" 1.00 UND RD$63.56 RD$11.44 RD$63.56 RD$11.44
Juego de tornillos de basineta 1.00 UND RD$50.00 RD$9.00 RD$50.00 RD$9.00
Cemento blanco 0.05 FDA RD$642.37 RD$115.63 RD$32.12 RD$5.78
Teflón 0.25 UND RD$14.41 RD$2.59 RD$3.60 RD$0.65
Salida Agua Potable 1/2" Poliestileno 18mm 1.00 UND RD$1,631.14 RD$85.37 RD$1,631.14 RD$85.37
Salida Sanitaria A.N. 4" Inodoro Aérea 1.00 UND RD$2,055.51 RD$131.64 RD$2,055.51 RD$131.64
Mano de obra
Mano de Obra Instalación inodoro 1.00 UND RD$1,283.75 RD$0.00 RD$1,283.75 RD$0.00
Total/UND RD$13,945.01 RD$1,832.45 RD$15,777.46

11.03 Suministro e instalación de desagüe de piso Ø2", PVC SDR 41, rejilla acero inoxidable (cuadrada 4"x4"), sifonada (completa)

sifón drenaje 2" 1.0000 UD 192.29 162.96 29.33 162.96 29.33 192.29
rejilla roscada de 2" HG para piso 1.0000 UD 70.00 59.32 10.68 59.32 10.68 70.00
desague de piso de 2 pulgadas (Incl. Parrilla 1.0000 Ud 1,122.30 1,122.30 0.00 1,122.30
COSTO/UD 1,344.58 40.01 1,384.59

11.04 Salida agua potable y desagüe p/meseta en acero inoxidable con fregadero

Tubo 2", pvc SDR-41 + 10% desp. 44.0000 P 53.68 45.50 8.19 2,001.78 360.32 2,362.11
Entrada de agua potable de Ø 1/2" (40' +10 44.0000 P 9.15 7.75 1.40 341.19 61.41 402.60
Tubería de cobre de Ø 1/2" para aire (40' + 44.0000 P 37.20 31.53 5.67 1,387.12 249.68 1,636.80
Mano de obra del desagüe 2" 1.0000 UD 598.61 598.61 0.00 598.61
Mano de obra salida de agua 1.0000 UD 856.94 856.94 0.00 856.94
COSTO/UD 5,185.64 671.42 5,857.06

Suministro e instalación de cambiador de bebé. Plataforma abatible de polietileno de alta densidad y resistencia. Gran resistencia a impactos, olores y bacterias. Incorpora cinturón de seguridad para sujetar al
11.04 bebé, ajustable fácilmente con una sola mano. Color gris claro. Con cavidad para stockar toallas limpias.
11.05 Suministro e instalación de papelera o zafacón en acero inoxidable, accionado de pedal abierto y cierre suave integrado, de metal con tapa. Extraíble forro interior de plástico recoge las fugas y derrames y
protege el basura bolsas de roturas. Funcionamiento silencioso y sistema de amortiguador reduce el ruido. Capacidad 20 lts

11.06 Suministro e instalación de espejo, de 1/4" de espesor con los contornos biselados con distanciadores en acero inoxidables de 1/2" en la parte inferior y de 1" en la parte superior para proporcionar una
inclinación que permita visibilidad para pacientes en silla de ruedas dimensiones: 18" x 36" (46 x 91 cm) ancho y alto.

Suministro e instalación dispensador combi/mixto de rollo o toalla zig-zag. Fabricado en plástico, color blanco de alta calidad y resistencia. Cerradura con llave y opción rollo/bobina o toalla zig-zag. Poco
11.07 voluminoso y fijado a pared mediante tacos y tornillos. Admite 1 Rollo de Papel continuo o anchura 240 mm y Ø 130 mm máximo o 400 toallas de papel tipo Z. Recarga rápida y fácil tanto de rollo/bobina como
de toallas. Fácil mantenimiento y limpieza.

11.08 Jabonera en plástico color blanco p/lavamanos, empotrada en muro

11.09 Dispensador de jabón liquido, de plástico, de 800ml, empotrada en muro

Suministro e instalación de porta papeles rollo en continuo. Fabricado en plástico color blanco de alta calidad. Cerradura con llave y visor de control de carga.
11.1 Capacidad rollos de hasta 300m con diámetro máximo de 220 mm. y para rollos con mandril de 45 mm. de diámetro. Fácil limpieza y reposición del rollo. Robusto, resistente y de larga duración. Apertura
batiente frontal.
12.000 Sistema Hidrosanitario

A Movimiento de tierras

12.01 Excavación p/tubería a mano

EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos

MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32

Sub-Total (3) Mano de Obra 449.32 0.00 449.32

COSTO/MT³ 456.93 1.37 458.30

12.02 Relleno de reposición compactado

Alq. Compactador maquito 1.0000 M3 10.42 8.83 1.59 8.83 1.59 10.42
Peones ( 3 ) 3.0000 Hr 102.97 308.91 0.00 308.91
Combustible (3 Galones/día) 0.3800 Gls 221.60 187.80 33.80 71.36 12.85 84.21
Lubricante 0.1500 Gls 84.21 71.36 12.85 10.70 1.93 12.63
SUB-TOTAL 416.16
Rendimiento 3.0000 Mt³/Hr 416.16 138.72 138.72
Material granular 1.5000 Mt³ 650.00 975.00 0.00 975.00
Regado y mojado 1.0000 Mt³ 175.00 175.00 175.00
Herramienta 0.0200 % 1,113.72 943.83 169.89 18.88 3.40 22.27
COSTO/MT³ 1,307.60 3.40 1,311.00

Agua 15.2200 GL 1.00 15.22 0.00 15.22


Traslado del material (1 TC = 4.00 m3 / día) 0.3160 DÍA 823.75 260.31 0.00 260.31
Material granular 0.6700 Mt³ 650.00 435.50 0.00 435.50
Regar, mojar y apisonar (1 TC = 9.80 m3
compactado / día) 0.1020 DÍA 823.75 84.06 84.06
Total / M3 COSTO/MT³ 795.08 0.00 795.08

12.03 Material de asiento p/tubería

PALA "TRAMONTINA" 0.0100 UD 775.00 656.78 118.22 6.57 1.18 7.75


PICO "TRAMONTINA" 0.0100 UD 1,121.00 950.00 171.00 9.50 1.71 11.21
regado, nivelado y apisonado de relleno 1.2000 m3 76.00 91.20 0.00 91.20
arena gruesa ITABO (de mina) 1.0000 m3 1,200.00 1,200.00 0.00 1,200.00
Herramientas (2%) 0.0200 P.A. 1,218.96 1,033.02 185.94 20.66 3.72 24.38
COSTO/MT³ 1,327.93 6.61 1,334.54

12.04 Bote de material

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73

MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje
Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

B Suministro y Colocación Tuberías PVC SCH-40

12.05 Tuberías de ø1/2" PVC SCH-40

SUMINISTRO DE TUBO 1.00 ML 90.63 76.81 13.83 76.81 13.83 90.63


REPLANTEO 1.00 ML 15.00 15.00 0.00 15.00
MANO DE OBRA 1.00 ML 6.93 6.93 0.00 6.93
COSTO/Ml 98.74 13.83 112.56

12.06 Tuberías de ø3/4" PVC SCH-40

SUMINISTRO DE TUBO 1.00 ML 126.02 106.80 19.22 106.80 19.22 126.02


REPLANTEO 1.00 ML 15.00 15.00 0.00 15.00
MANO DE OBRA 1.00 ML 6.93 6.93 0.00 6.93
COSTO/Ml 128.73 19.22 147.95

12.07 Tuberías de ø1" PVC SCH-40

SUMINISTRO DE TUBO 1.00 ML 181.26 153.61 27.65 153.61 27.65 181.26


REPLANTEO 1.00 ML 15.00 15.00 0.00 15.00
MANO DE OBRA 1.00 ML 13.86 13.86 0.00 13.86
COSTO/Ml 182.48 27.65 210.13

12.08 Válvula de paso de bola tipo palanca ø1/2"

llave de paso de palanca 1.00 UD 135.00 114.41 20.59 114.41 20.59 135.00
Adaptador 1/2" 2.00 UD 20.00 16.95 3.05 33.90 6.10 40.00
Teflón 0.02 UD 20.00 16.95 3.05 0.34 0.06 0.40
Mano de obra coloc. 1.00 UD 465.00 465.00 0.00 465.00
COSTO/UD 613.64 26.76 640.40

12.09 Válvula de paso de bola tipo palanca ø3/4"

llave de paso de palanca 1.00 UD 150.00 127.12 22.88 127.12 22.88 150.00
Adaptador 3/4" 2.00 UD 20.00 16.95 3.05 33.90 6.10 40.00
Teflón 0.02 UD 20.00 16.95 3.05 0.34 0.06 0.40
Mano de obra coloc. 1.00 UD 699.00 699.00 0.00 699.00
0.00 0.00 0.00
COSTO/UD 860.36 29.04 889.40

12.1 Accesorios y piezas tuberías agua potable (codos, tee, reducciones, uniones y otros)

Tuberías de ø1/2" PVC SCH-40 40.00 UD 112.56 95.39 17.17 3,815.70 686.83 4,502.53
Tuberías de ø3/4" PVC SCH-40 10.00 UD 147.95 125.38 22.57 1,253.84 225.69 1,479.53
Tuberías de ø1" PVC SCH-40 10.00 UD 210.13 178.07 32.05 1,780.73 320.53 2,101.26
Válvula de paso de bola tipo palanca ø1/2" 5.00 UD 640.40 542.71 97.69 2,713.56 488.44 3,202.00
Válvula de paso de bola tipo palanca ø3/4" 5.00 UD 889.40 753.73 135.67 3,768.64 678.36 4,447.00
COSTO/UD 13,332.47 2,399.84 15,732.32

COSTO/TOTAL 666.62 119.99 786.62

C Suministro y Colocación Tuberías PVC SDR-41 (inc.excavación, asiento de arena & tapado)

12.11 Tuberías de ø4" PVC SDR-41

Excavación, prof. 50Cms, Ancho 30 cm 0.15 M3 458.30 388.39 69.91 58.26 10.49 68.75
Tubo 4", pvc SDR-41 + 5% desp. 3.44 P 82.39 69.82 12.57 240.46 43.28 283.75
Asiento de arena e=10 cm + 10% Desp. 0.03 M3 1,334.54 1,130.97 203.57 37.32 6.72 44.04
Mano de obra coloc. Tubo 1.00 M 63.28 63.28 0.00 63.28
COSTO/ML 399.33 60.49 459.82
COSTO/PL 121.75 18.44 140.19

12.12 Tuberías de ø6" PVC SDR-41

Excavación, prof. 50Cms, Ancho 30 cm 0.15 M3 458.30 388.39 69.91 58.26 10.49 68.75
Tubo 6", pvc SDR-41 + 5% desp. 3.44 P 621.94 527.06 94.87 1,815.21 326.74 2,141.95
Asiento de arena e=10 cm + 10% Desp. 0.03 M3 1,334.54 1,130.97 203.57 37.32 6.72 44.04
Mano de obra coloc. 1.00 M 34.68 34.68 0.00 34.68
COSTO/ML 1,945.47 343.94 2,289.41
COSTO/PL 593.13 104.86 697.99

12.13 Accesorios y piezas tuberías aguas negras (codos, tee, reducciones, uniones y otros)

Tuberías de ø4" PVC SDR-41 25.00 m 459.82 389.67 70.14 9,741.85 1,753.53 11,495.39
Tuberías de ø6" PVC SDR-41 25.00 m 2,289.41 1,940.18 349.23 48,504.54 8,730.82 57,235.36
COSTO/ML 58,246.40 10,484.35 68,730.75

COSTO/TOTAL 5,824.64 1,048.44 6,873.07

D Suministro y Colocación Tuberías PVC SDR-32.5

12.14 Desagües pluviales Ø3" PVC SDR-32.5, h= 3.00 m, unión con cemento solvente. Incluye parte proporcional de piezas especiales, tapado ranura ambas caras en la pared.

Tubo 3"x19' PVC SDR-32.5+ 10% desp. 0.60 TUBO 2,917.55 2,472.50 445.05 1,483.50 267.03 1,750.53
Codo 3" PVC drenaje 1.00 UD 44.84 38.00 6.84 38.00 6.84 44.84
Reducción Yee de 4a3 pvc drenaje 1.00 UD 99.43 84.26 15.17 84.26 15.17 99.43
Codo 3"x45, pvc dren. 1.00 UD 33.04 28.00 5.04 28.00 5.04 33.04
Cemento pvc tangit, 50 ml + 25% desp. 0.25 UD 98.50 83.47 15.03 20.87 3.76 24.63
Abrazaderas de 3´´ de metal. 3.00 UD 55.00 46.61 8.39 139.83 25.17 165.00
Mano de obra por planta. 1.00 DÍA 707.49 707.49 0.00 707.49
COSTO/UD 2,501.95 323.00 2,824.96

12.15 Suministro e instalación de protector p/desagües de techo (tipo araña)


E Cámara de inspección, trampa de grasa

12.16 Construccion de cámara de inspección 0.60mx0.60m (medidas interiores) (con altura variable), con bloques 6" (industrial), losa de fondo, incluye pañete interior pulido (fondo y muros) y tapa en hormigon
aramado

Exc. En tierra 1.01 m3 458.30 461.97 0.00 461.97


Relleno reposición manual 0.44 m3 163.34 72.03 0.00 72.03
Bote de Material 1.01 m3 1,288.31 1,298.62 0.00 1,298.62
Losa de fondo 0.08 m3 11,621.53 9,848.76 1,772.78 797.75 143.59 941.34
Losa superior 0.08 m3 15,045.61 12,750.52 2,295.09 1,032.79 185.90 1,218.69
Bloques de 6" B.N.P. 2.10 m2 1,499.07 1,270.40 228.67 2,667.84 480.21 3,148.05
Pañete rateado- m.llana 1.68 m2 293.91 249.07 44.83 418.44 75.32 493.76
COSTO/MT² 6,749.45 885.03 7,634.48

Carga y bote de material a mano 1.220 M3E RD$525.00 RD$0.00 RD$640.50 RD$0.00
Hormigón 1:3:5 ligado a mano en piso y losa 0.220 M3 RD$5,721.68 RD$848.64 RD$1,258.77 RD$186.70
Bloques de 6" (solo suministro) 30.000 UND RD$38.14 RD$6.86 RD$1,144.07 RD$205.80
Acero corrugado 3/8" 0.150 QQ RD$3,220.34 RD$579.66 RD$483.05 RD$86.95
Mortero 1:3 para colocación de bloques 0.130 M3 RD$6,132.22 RD$1,029.57 RD$797.19 RD$133.84
Mortero 1:4 para pañete pulido 0.075 M3 RD$6,467.18 RD$1,089.88 RD$485.04 RD$81.74
Mano de obra
Excavación a mano 0.90 M3N RD$823.75 RD$0.00 RD$741.38 RD$0.00
Mano de Obra cámara de inspección 1.00 UND RD$1,428.25 RD$0.00 RD$1,428.25 RD$0.00
Total/UND RD$6,978.25 RD$695.03 RD$7,673.28

F Ventilaciones

12.17 Ventilación de ø3" PVC SDR-41

tubo 3" PVC SDR-41 0.50 UD 630.77 534.55 96.22 267.28 48.11 315.39
codo PVC drenaje 3" x 90° 1.00 UD 45.24 38.34 6.90 38.34 6.90 45.24
cemento PVC 0.00 GLS 1,799.00 1,524.58 274.42 5.49 0.99 6.48
instalación Ventilación de 3" 1.00 Ud 809.27 809.27 0.00 809.27
COSTO/UD 1,120.37 56.00 1,176.37

G Misceláneos

12.18 Suministro y colocación de tinacos de 530 gal. (incluye tuberías, piezas y mano de obra)

Tinaco 530.00gls 1.00 ud 15,299.00 12,965.25 2,333.75 12,965.25 2,333.75 15,299.00


Tuberías y Piezas P.V.C. Presión 1.00 P.A. 2,500.00 2,118.64 381.36 2,118.64 381.36 2,500.00
M.O. 1.00 P.A. 1,750.00 1,750.00 0.00 1,750.00
COSTO/UD 16,833.90 2,715.10 19,549.00

12.19 Corte con pulidora, ranura, perforaciones, anclaje c/ varillas, repello y terminación p/ colocación de ventilación

12.2 Suministro e instalación de equipo de bombeo para agua potable: 32 GPM vs 82 pies TDH, 2 HP. Incluye dispositivos y accesorios en succión desde cisterna e impulsión en cuarto de equipos. Totalmente
instalado, (arrancador, switch, manómetro)
12.21 Suministro e instalación de tanque hidroneumático 42 gls. Incluye todos los accesorios.

13.000 Topes y/o Gabinetes en Acero Inoxidable

13.01 Suministro y colocación de mueble en acero inoxidable (tope y gabinete de piso) grado 316 (1.85x0.60)m, una poceta con respaldo en acero inoxidable, sin pocetas, moldeado en una sola pieza sin juntas ni
fisuras, postformado, doble bullnose, puertas con marcos dobles en doble tola de acero inoxidable, tiradores rectos en acero inoxidable. en trabajo Esteril

Suministro y colocación de gabinete de


piso en acero inoxidable grado 316, calibre
18, moldeado en una sola pieza sin juntas
ni fisuras, postformado, doble bullnose, 1.00 pies 112,258.00 95,133.90 17,124.10 95,133.90 17,124.10 112,258.00
puertas con marcos reforzados en doble
tola de acero inoxidable, tiradores rectos
en acero inoxidable

Suministro y colocación de tope en acero


inoxidable grado 316, calibre 16, (ancho de
0.60m) , con respaldo en acero inoxidable, 1.00 pies 45,510.00 38,567.80 6,942.20 38,567.80 6,942.20 45,510.00
con una poceta, moldeado en una sola
pieza sin juntas ni fisuras, postformado,
doble bullnose, con mezcladora tipo ganso

COSTO/UD 133,701.69 24,066.31 157,768.00

13.02 Suministro y colocación de mueble en acero inoxidable (tope y gabinete de piso) grado 316 (1.85x0.60)m, una poceta con respaldo en acero inoxidable, sin pocetas, moldeado en una sola pieza sin juntas ni
fisuras, postformado, doble bullnose, puertas con marcos dobles en doble tola de acero inoxidable, tiradores rectos en acero inoxidable.En trabajo no esteril

Suministro y colocación de gabinete de


piso en acero inoxidable grado 316, calibre
18, moldeado en una sola pieza sin juntas
ni fisuras, postformado, doble bullnose, 1.00 pies 112,258.00 95,133.90 17,124.10 95,133.90 17,124.10 112,258.00
puertas con marcos reforzados en doble
tola de acero inoxidable, tiradores rectos
en acero inoxidable

Suministro y colocación de tope en acero


inoxidable grado 316, calibre 16, (ancho de
0.60m) , con respaldo en acero inoxidable, 1.00 pies 45,510.00 38,567.80 6,942.20 38,567.80 6,942.20 45,510.00
con una poceta, moldeado en una sola
pieza sin juntas ni fisuras, postformado,
doble bullnose, con mezcladora tipo ganso

COSTO/UD 133,701.69 24,066.31 157,768.00

Suministro y colocación de gabinete de pared en acero inoxidable grado 316, calibre 18, moldeado en una sola pieza sin juntas ni fisuras, postformado, doble bullnose, puertas con marcos reforzados en doble
13.03 tola de acero inoxidable, tiradores rectos en acero inoxidable
13.04 Construcción de base de hormigón armado con malla electrosoldada p/gabinetes de piso, e=0.10m

14.000 Cortinas Hospitalarias

Cortinas hospitalaria para formar cubículos tipo Oxford, antibacterial y antialergénicas, antihongos y antiacaros, resistente a las manchas, antiestática, libre de olores, color gris (deslizables sobre rieles, con
14.01 malla en la parte superior, retardadora de fuego, lavable y de planchado duradero) Cortina curva (Certificación NFPA 70) Riel de aluminio ancho 3.2cm / alto 2.9cm / grosor 1.3mm. Longitud minima de 4.00m

15.000 Topes de Granito

15.01 Suministro y colocación tope en granito natural (gris claro o blanco), con terminación doble bullnose (incluye soporte)

15.02 Muros counter completo (excavación, zapatas, bloques, relleno de reposición, pañete, cantos, pintura) (ver planos) en estacion de enfermeria
16.000 Rótulos

16.01 Suministro y colocación rotulación 35cmx10cm en acrílico transparente 3mm con vinil impreso en espejo, con base en vinil blanco (para contraste) y adosado a pared con tornillos decorativos de 1/4"

16.02 Suministro y colocación rotulación 70cmx30cm en acrílico transparente 3mm con vinil impreso en espejo, con base en vinil blanco (para contraste) y adosado a pared con tornillos decorativos de 1/4"

16.03 Suministro y colocación rotulación 70cmx30cm en acrílico transparente 3mm con vinil impreso en espejo, con base en vinil blanco (para contraste), colgante con cable de acero

16.04 Suministro y colocación rotulación en celtex de 3mm, con diseño en vinyl autoadhesivo ploteado. Medidas: 20x20 cm.
16.05 Suministro y colocación rotulación en celtex de 3mm, con diseño en vinyl autoadhesivo ploteado. Medidas: 10x10 cm.

16.06 Suministro y colocación rotulación 120cmx86cm en acrílico transparente 3mm con vinil impreso en espejo, con base en vinil blanco (para contraste) y adosado a pared con 6 tornillos decorativos de 1/4"

16.07 Suministro y colocación de letrero en acrílico 3D, letras independientes, volumétricas de acrílico rojo de 3mm con luces LED, de h=12" (EMERGENCIA)
16.08 Señalización ruta de evacuación, letreros en Sintra y vinil (8"x 8"), reflectivo, espesor 6mm

16.09 Imágenes ilustrativas en vinyl, a todo color, sobre acrílico de 5mm con base blanca y fijado con tornillos decorativos. Dimensiones: 24"x36"

16.1 Imágenes ilustrativas en vinyl, a todo color, sobre acrílico de 5mm con base blanca y fijado con tornillos decorativos. Dimensiones: 36"x36"
16.11 Imágenes ilustrativas en vinyl, a todo color, sobre acrílico de 5mm con base blanca y fijado con tornillos decorativos. Dimensiones: 36"x24"

17.000 Barras de Seguridad

17.01 Barras de apoyo pared-piso en acero inoxidable grado 304 de 1-1/2", en forma de L, longitud de 0.75m, h=0.75m, con cubrefalta en las bases de 3"
17.02 Barra de apoyo abatible en acero inoxidable grado 304 de 1 1/4", longitud de 0.75m, de giro vertical, con base atornillable en muro (0.10mx0.25m)

17.03 Barra de apoyo en acero inoxidable grado 304, inclinada en ducha, con cubre falta en las bases de 3"

17.04 Barra de apoyo en acero inoxidable grado 304, recta de 45cm, con cubrefalta en las bases de 3"

18.000 Herrería

18.01 Escalera tipo gato: en tubular de 1 1/2", en hierro galvanizado, totalmente construida e instalada (incluye baranda de llegada), fijación en base, muro y techo, terminación en pintura esmalte blanco. Altura
piso-antepecho=3.90m
19.000 Sistema Contra Incendios

19.01 Suministro y colocación de extintor tipo ABC químico seco de 9kg (incluye gabinete y rótulos: flecha e instrucciones)

19.02 Suministro y colocación de extintor de CO2 de 9kg (incluye rótulos: flecha e instrucciones)

20.000 OTRAS INSTALACIONES

CONSTRUCCION MARQUESINA AMBULANCIA

A Preliminar:

20.01 Replanteo con charrancha.

242.0000 M2
Madera pino bruto americano 1"x4"x12 79.2000 P2 125.00 105.93 19.07 8,389.83 1,510.17 9,900.00
Madera pino bruto americano 2"x4"x12 158.4000 P2 125.00 105.93 19.07 16,779.66 3,020.34 19,800.00
Clavos dulce 2 1/2" 9.5000 LB 60.00 50.85 9.15 483.05 86.95 570.00
Cal 20 Kilos 6.0000 FDA 260.00 220.34 39.66 1,322.03 237.97 1,560.00
Hilo de gangorra 2.0000 U 169.00 143.22 25.78 286.44 51.56 338.00
Cinta métrica 0.1000 U 1,650.00 1,398.31 251.69 139.83 25.17 165.00
Brigada Topográfica 0.5000 DIA 17,700.00 15,000.00 2,700.00 7,500.00 1,350.00 8,850.00
Maestro 1.0000 DIA 2,471.25 2,471.25 0.00 2,471.25
Carpintero de Segunda Categoria 1.0000 DIA 1,058.75 1,058.75 0.00 1,058.75
Trabajador No calificado (TNC) 2.0000 Día 823.75 1,647.50 0.00 1,647.50
COSTO/UD 40,078.35 6,282.15 46,360.50
COSTO/MT² 165.61 25.96 191.57

20.02 Demolición de contén

Volumen Análisis 20.00 M2


Mano de Obra
Ayudante 0.50 DIA RD$1,058.75 RD$0.00 RD$529.38 RD$0.00
Peon 2.00 DIA RD$823.75 RD$0.00 RD$1,647.50 RD$0.00
Materiales y Equipos

Carretilla, Mandarria, cincel, pico y otros 5.00 % RD$2,176.88 RD$391.84 RD$108.84 RD$19.59
Total/UND RD$2,285.72 RD$19.59 RD$2,305.31
RD$114.29 RD$0.98 RD$115.27

20.03 Corte con sierra en asfalto y concreto


20.04 Demolición de asfalto

20.05 Acarreo de bote material (incluye traslado y carguío)

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73

MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

B Movimiento de Tierra:

20.06 Excavación p/ elementos estructurales (incluye acopio de material).

EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos

MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32

Sub-Total (3) Mano de Obra 449.32 0.00 449.32

COSTO/MT³ 456.93 1.37 458.30

20.07 Relleno de reposición compactado (con medio mecánicos).

Alq. Compactador maquito 1.0000 M3 10.42 8.83 1.59 8.83 1.59 10.42
Peones ( 3 ) 3.0000 Hr 102.97 308.91 0.00 308.91
Combustible (3 Galones/día) 0.3800 Gls 221.60 187.80 33.80 71.36 12.85 84.21
Lubricante 0.1500 Gls 84.21 71.36 12.85 10.70 1.93 12.63
SUB-TOTAL 416.16
Rendimiento 3.0000 Mt³/Hr 416.16 138.72 138.72
Material granular 1.5000 Mt³ 650.00 975.00 0.00 975.00
Regado y mojado 1.0000 Mt³ 175.00 175.00 175.00
Herramienta 0.0200 % 1,113.72 943.83 169.89 18.88 3.40 22.27
COSTO/MT³ 1,307.60 3.40 1,311.00

20.08 Bote material inservible (incluye traslado y carguío)

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73


MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

C Hormigón Armado B.N.P:

20.09 Zapata de columnas C1 (1.60mx1.40mx0.45m) (Acero inferior: 1/2"@0.15m A.D.) (Hormigón Industrial 280kg/cm2).

Acero - Cuantía QQ/M3 1.05 QQ 3,800.00 3,220.34 579.66 3,367.84 606.21 3,974.05
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Alambre Dulce No. 18 2.0916 LB 100.00 84.74 15.25 177.25 31.90 209.15
Mano de Obra Acero 1.0458 qq 613.41 641.50 0.00 641.50
COSTO/MT³ 11,644.22 1,980.49 13,624.71

20.1 Zapatas de muros 15cm (0.45mx0.25m), acero long. 3ø3/8", ø3/8"@0.25m (Hormigón Industrial 280kg/cm2).

Acero - Cuantía QQ/M3 1.03 QQ 3,800.00 3,220.34 579.66 3,319.11 597.44 3,916.55
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Alambre Dulce No. 18 2.0613 LB 100.00 84.74 15.25 174.68 31.44 206.13
Mano de Obra Acero 1.0307 qq 613.41 632.22 0.00 632.22
COSTO/MT³ 11,583.64 1,971.26 13,554.90

20.11 Viga riostra (0.15mx0.25m) (4 Ø de 3/8" y est. 3/8" @0.20m (Hormigón Industrial 280kg/cm2).

Acero - Cuantía QQ/M3 3.66 QQ 3,800.00 3,220.34 579.66 11,786.44 2,121.56 13,908.00
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Alambre Dulce No. 18 7.3200 LB 100.00 84.74 15.25 620.31 111.66 731.97
Mano de Obra Acero 3.6600 qq 613.41 2,245.07 0.00 2,245.07
Encofrado viga de amarre Todo Costo 33.33 ML 112.33 3,743.94 0.00 3,743.94
COSTO/MT³ 25,853.40 3,575.59 29,428.99

Pavimento en hormigón hidráulico en área de marquesina y acceso con terminación en estampado tipo madera con color, e=0.15m, armado con acero 3/8"@0.20m (Hormigón 210kg/cm2). (incluye capa
20.12 protectora de sealer acabado brilloso y corte en concreto para juntas)

Acero - Cuantía QQ/M3 1.0000 QQ 3,800.00 3,220.34 579.66 3,220.34 579.66 3,800.00
Hormigón Industrial 210 Kg/cm2 1.1000 M3 7,205.15 6,106.06 1,099.09 6,716.66 1,209.00 7,925.66
Madera cepillada pino americano 1.0000 p2 125.00 105.93 19.07 105.93 19.07 125.00
Alambre Dulce No. 18 2.0000 LB 100.00 84.74 15.25 169.48 30.51 199.99
Preparación superficie - Ayudante AY 0.0667 DIA 1,058.75 70.62 0.00 70.62
Mano de Obra Acero 1.0000 QQ 401.30 401.30 0.00 401.30
Mano de obra frotado 6.6700 M2 182.40 1,216.61 0.00 1,216.61
COSTO/MT³ 11,900.94 1,838.24 13,739.18

D Hormigón Armado S.N.P:

20.13 Columna C2-Marq (0.30mx0.40m) (6 ø de 3/4") (6 ø de 1/2") est, de ø 3/8" @ 0.20m (Hormigón Industrial 280kg/cm2).

Acero - Cuantía QQ/M3 4.90 QQ 3,800.00 3,220.34 579.66 15,786.34 2,841.54 18,627.88
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Encofrado columna a Todo Costo 25.00 Ml 380.19 9,504.81 0.00 9,504.81
Alambre Dulce No. 18 9.8041 LB 100.00 84.74 15.25 830.82 149.55 980.37
Mano de Obra Acero 4.9021 QQ 637.40 3,124.58 0.00 3,124.58
COSTO/MT³ 36,704.19 4,333.46 41,037.65

20.14 Viga V4-Marq (0.20mx0.40m) (acero inferior: 2 de 3/4") (acero superior: 2 de 1/2") (acero inferior: 2 de 3/84") (est. 3/8"@0.20m) (Hormigón Industrial 280kg/cm2)

Acero - Cuantía QQ/M3 3.91 QQ 3,800.00 3,220.34 579.66 12,602.11 2,268.38 14,870.49
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Encofrado viga carga Todo Costo 12.50 Ml 730.00 9,125.00 0.00 9,125.00
Alambre Dulce No. 18 7.8266 LB 100.00 84.74 15.25 663.24 119.38 782.62
Mano de Obra Acero 3.9133 QQ 637.40 2,494.33 0.00 2,494.33
COSTO/MT³ 32,342.30 3,730.14 36,072.44

20.15 Losa en hormigon armado (Hormigon Industrial 280kg/cm2) (ver planos). H=0.15 m

Acero - Cuantía QQ/M3 1.28 QQ 3,800.00 3,220.34 579.66 4,122.03 741.97 4,864.00
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 M3 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
Encofrado viga carga Todo Costo 6.67 Ml 730.00 4,866.67 0.00 4,866.67
Alambre Dulce No. 18 2.5600 LB 100.00 84.74 15.25 216.94 39.05 255.99
Mano de Obra Acero 1.2800 QQ 637.40 815.87 0.00 815.87
COSTO/MT³ 17,479.14 2,123.39 19,602.53

E Muros:

20.16 Construcción de muros de bloques de hormigón de 6" (industrial), bastones ø3/8"@0.40m (con todos los huecos llenos)

bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 3/8" x 20' -G40 0.0420 QQ 3,800.00 3,220.34 579.66 135.25 24.35 159.60
alambre dulce #18 0.0840 Lbs 100.00 84.74 15.25 7.12 1.28 8.40
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 Kg/cms2 (1:3:5) 0.0590 m3 6,116.15 5,183.18 932.97 305.81 55.05 360.85
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.40 mts 13.0000 Ud 2.10 1.78 0.32 23.16 4.17 27.33
Andamios 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Herramientas (2%) 0.0200 P.A. 734.50 622.46 112.04 12.45 2.24 14.69
COSTO/MT² 1,596.98 214.06 1,811.04

20.17 Muros de bloques de hormigón de 6" (en antepecho).

bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 3/8" x 20' -G40 0.1184 QQ 3,800.00 3,220.34 579.66 381.27 68.63 449.90
alambre dulce #18 0.1590 Lbs 100.00 84.74 15.25 13.47 2.43 15.90
mezcla 1:3 0.0250 m3 6,993.84 5,926.98 1,066.86 148.17 26.67 174.85
Hormigón 140 Kg/cms2 (1:3:5) 0.0367 m3 6,116.15 5,183.18 932.97 190.05 34.21 224.26
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 1.34 0.24 17.39 3.13 20.52
Andamios 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Herramientas (2%) 0.0200 P.A. 1,032.30 874.83 157.47 17.50 3.15 20.65
COSTO/MT² 1,648.13 234.25 1,882.39

Bloques de Hormigón 16" x 8" x 6"


Volumen Análisis 1.00 M2
Materiales y Equipos
Suministro bloques horm. +4% desp. 13.00 UND RD$38.14 RD$6.86 RD$495.76 RD$89.18
Hormigón 1:3:5 en cámaras +10% desp. 0.0367 M3 RD$5,721.68 RD$848.64 RD$209.79 RD$31.12
Mortero 1:3 en juntas + 30% desp. 0.0250 M3 RD$6,132.22 RD$1,029.57 RD$153.31 RD$25.74
Acero bastones 3/8" + 20% desp. 0.1184 QQ RD$3,220.34 RD$579.66 RD$381.27 RD$68.63
Alambre Dulce No. 18 para amarrar bastones 0.1590 LB RD$93.22 RD$16.78 RD$14.82 RD$2.67
Andamios 1.00 M2 RD$50.24 RD$0.00 RD$50.24 RD$0.00
Mano de Obra
Colocación bloques 13.00 UND RD$17.02 RD$0.00 RD$221.26 RD$0.00
Llenado de huecos @ 0.60 m 13.00 UND RD$3.13 RD$0.00 RD$40.69 RD$0.00
Corte y amarre varillas @ 0.60 m 13.00 UND RD$4.71 RD$0.00 RD$61.23 RD$0.00
Total/UND RD$1,628.37 RD$217.34 RD$1,845.71

F Terminación de Superficies:

20.18 Fraguache.

Escoba 0.0100 U 15.00 12.71 2.29 0.13 0.02 0.15


mezcla 1:6 0.0080 m3 4,712.52 3,993.66 718.86 31.95 5.75 37.70
fraguache con escoba 1.0000 m2 28.41 28.41 0.00 28.41
Andamios 1.0000 m2 63.09 53.47 9.62 53.47 9.62 63.09
Herramientas (2%) 0.0200 P.A. 37.85 32.08 5.77 0.64 0.12 0.76
COSTO/MT² 114.59 15.51 130.10

Mortero 1:4 de empañete 1.50mm + 50% de 0.0020 M3 RD$6,467.18 RD$1,089.88 RD$12.93 RD$2.18
Regla madera americana cepillada 1"x4" / 2 0.1667 PT RD$105.93 RD$19.07 RD$17.66 RD$3.18
Mano de Obra
Mano de obra fraguache 1.00 M2 RD$45.19 RD$0.00 RD$45.19 RD$0.00
Total/UND RD$75.78 RD$5.36 RD$81.14

20.19 Pañete maestreado en muros, vigas y columnas (con mortero seco premezclado de agregados de granulometría controlada).

Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 6,312.04 5,349.18 962.85 117.15 21.09 138.23
Regla madera americana cepillada 1"x4" / 2 0.1667 PT 125.00 105.93 19.07 17.66 3.18 20.84
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra empañete exterior 1.0000 M2 187.07 187.07 0.00 187.07
COSTO/MT² 375.34 33.89 409.23

20.2 Pañete maestreado techo (con mortero 1:4).

Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 6,312.04 5,349.18 962.85 117.15 21.09 138.23
Regla madera americana cepillada 1"x4" / 2 0.1667 PT 125.00 105.93 19.07 17.66 3.18 20.84
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra empañete exterior 1.0000 M2 270.64 270.64 0.00 270.64
COSTO/MT² 458.91 33.89 492.80

20.21 Cantos.

madera pino americano cepillada 0.8300 P2 125.00 105.93 19.07 87.92 15.83 103.75
mezcla 1:1.5:5 (pañete) 0.0050 m3 3,457.52 2,930.10 527.42 14.65 2.64 17.29
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 121.04 102.57 18.46 2.05 0.37 2.42
COSTO/ML 186.96 18.83 205.79
20.22 Gotero colgante.

Mortero 1:4 para empañete + 30% desp. 0.0200 M3 6,312.04 5,349.18 962.85 106.98 19.26 126.24
Regla madera americana cepillada 1"x4" / 1 0.3300 PT 125.00 105.93 19.07 34.96 6.29 41.25
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra goteros colgantes 1.0000 M2 190.00 190.00 0.00 190.00
COSTO/ML 385.41 35.17 420.58

Mortero 1:4 para empañete + 30% desp. 0.0200 M3 RD$6,467.18 RD$1,089.88 RD$129.34 RD$21.80
Regla madera americana cepillada 1"x4" / 1 0.33 PT RD$105.93 RD$19.07 RD$34.96 RD$6.29
Andamios en madera 1.00 M2 RD$50.24 RD$1.97 RD$50.24 RD$1.97
Mano de Obra
Mano de obra goteros colgantes 1.00 M2 RD$191.07 RD$0.00 RD$191.07 RD$0.00
Total/UND RD$405.61 RD$30.06 RD$435.67

G Pintura:

20.23 Imprimador acrílico de alto desempeño, 100% látex acrílico, resistente a la alcalinidad y a la eflorescencia (capa base, una mano). Incluye preparación de superficie.

Imprimador (primer) acrílico de alto desem 0.0800 GLS 650.00 550.85 99.15 44.07 7.93 52.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 137.00 116.10 20.90 2.32 0.42 2.74
COSTO/MT² 187.23 19.79 207.02

20.24 Suministro y aplicación de pintura acrílica en interiores, calidad superior (dos capas) (incluye preparación de superficie) (para techos)

pintura acrílica 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Andamios - Guidolas 0.5000 M2 63.09 53.47 9.62 26.73 4.81 31.55
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 272.74 35.18 307.93

Pintura acrílica superior Int/ext


Volumen Análisis 1.00 M2
Materiales y Equipos
Suministro pintura 0.08 GL RD$1,500.00 RD$270.00 RD$120.00 RD$21.60
Mano de Obra
Preparación de superficie y aplicación 2 manos 1.00 M2 RD$65.66 RD$0.00 RD$65.66 RD$0.00
Desperdicios, retoques y material gastable - 20% 1.00 PA RD$41.45 RD$0.00 RD$41.45 RD$0.00
Total/UND RD$227.11 RD$21.60 RD$248.71

20.241 Pintura acrílica en exteriores, calidad superior (dos capas).

pintura acrílica 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Andmios - Guidolas 0.5000 M2 63.09 53.47 9.62 26.73 4.81 31.55
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 272.74 35.18 307.93

21.000 READECUACION AREA EXISTENTE

A Preliminares

21.01 Desmonte de puertas, considerar bote

Volumen Análisis 10.00 UD


Mano de Obra
Ayudante 0.50 DIA RD$1,058.75 RD$0.00 RD$529.38 RD$0.00
Peon 1.00 DIA RD$823.75 RD$0.00 RD$823.75 RD$0.00
Materiales y Equipos
Carretilla, Mandarria, cincel, pico y otros 2.00 % RD$1,353.13 RD$243.56 RD$27.06 RD$4.87
Total/UND RD$1,380.19 RD$4.87 RD$1,385.06
21.02 Desmonte de aparatos sanitarios, considerar bote

21.03 Desmonte de ventanas, considerar bote

Volumen Análisis 119.44 P2


Mano de Obra
Ayudante 1.00 DIA RD$1,058.75 RD$0.00 RD$1,058.75 RD$0.00
Peon 2.00 DIA RD$823.75 RD$0.00 RD$1,647.50 RD$0.00
Materiales y Equipos
Carretilla, Mandarria, cincel, pico y otros 2.00 % RD$2,706.25 RD$487.13 RD$54.13 RD$9.74
Total/UND RD$2,760.38 RD$9.74 RD$2,770.12

21.04 Demolicon de ceramicas en baños

Volumen Análisis 30.00 M2


Mano de Obra
Ayudante 0.50 DIA RD$1,058.75 RD$0.00 RD$529.38 RD$0.00
Peon 2.00 DIA RD$823.75 RD$0.00 RD$1,647.50 RD$0.00
Materiales y Equipos
Carretilla, Mandarria, cincel, pico y otros 5.00 % RD$2,176.88 RD$391.84 RD$108.84 RD$19.59
Total/UND RD$2,285.72 RD$19.59 RD$2,305.31

21.05 Demolicion de muros internos

Volumen Análisis 30.00 M2


Mano de Obra
Peon 2.00 DIA RD$823.75 RD$0.00 RD$1,647.50 RD$0.00
Materiales y Equipos
Carretilla, Mandarria, cincel, pico y otros 5.00 % RD$1,647.50 RD$296.55 RD$82.38 RD$14.83
Total/UND RD$1,729.88 RD$14.83 RD$1,744.71

21.06 Demolición de pisos y zócalos (incluye mortero)


Volumen Análisis 30.00 M2
Mano de Obra
Ayudante 0.50 DIA RD$1,058.75 RD$0.00 RD$529.38 RD$0.00
Peon 2.00 DIA RD$823.75 RD$0.00 RD$1,647.50 RD$0.00
Materiales y Equipos
Carretilla, Mandarria, cincel, pico y otros 5.00 % RD$2,176.88 RD$391.84 RD$108.84 RD$19.59
Total/UND RD$2,285.72 RD$19.59 RD$2,305.31

21.07 Bote producto de demoliciones

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73

MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

B Construcción Muros nuevos

21.08 Excavación de material (incluye acopio de material) (a mano)

EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos

MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32

Sub-Total (3) Mano de Obra 449.32 0.00 449.32

COSTO/MT³ 456.93 1.37 458.30

21.09 Relleno de reposicion

PALA "TRAMONTINA" 0.0100 UD 775.00 656.78 139.50 7.75 1.40 7.75


PICO "TRAMONTINA" 0.0100 UD 1,121.00 950.00 201.78 11.21 2.02 11.21
Regado, nivelado y apisonado de relleno 1.2000 m3 120.00 144.00 0.00 144.00
Herramientas (2%) 0.0200 P.A. 18.96 16.07 3.41 0.38 0.07 0.38
COSTO/MT³ 163.34 3.48 163.34

21.1 bote de material

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73

MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

21.11 Zapatas de muros 45cm (0.45mx0.25m), acero long superior . 3ø3/8" y acero long inferior estribos ø3/8"@0.25m (Hormigón Industrial 210kg/cm2).

Acero - Cuantía QQ/M3 0.71 QQ 3,800.00 3,220.34 579.66 2,286.44 411.56 2,698.00
Hormigon Industrial 240 Kg/cm2 + 10% desp 1.1000 M3 7,700.00 6,525.43 1,174.58 7,177.97 1,292.03 8,470.00
Alambre Dulce No. 18 1.4200 LB 100.00 84.74 15.25 120.33 21.66 141.99
Mano de Obra Acero 0.7100 qq 613.41 435.52 0.00 435.52
COSTO/MT³ 10,020.26 1,725.25 11,745.52

Zapatas Muros 6" 3 f 3/8" y 3/8" @ 0.25m


Volumen Análisis 1.00 M3
Materiales y Equipos
Acero - Cuantía QQ/M3 0.71 QQ RD$3,220.34 RD$579.66 RD$2,286.44 RD$411.56
Hormigon Industrial 210 Kg/cm2 + 10% desp. 1.10 M3 RD$6,271.19 RD$1,128.81 RD$6,898.31 RD$1,241.69
Alambre Dulce No. 18 1.42 LB RD$84.75 RD$15.25 RD$120.34 RD$21.66
Mano de Obra
Mano de Obra Acero 8.89 ML RD$130.52 RD$0.00 RD$1,160.18 RD$0.00
Total/UND RD$10,465.27 RD$1,674.91 RD$12,140.18
21.12 Construcción de muros de bloques de hormigón de 6" (industrial), bastones ø3/8"@0.40m (con todos los huecos llenos)

bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 3/8" x 20' -G40 0.0420 QQ 3,800.00 3,220.34 579.66 135.25 24.35 159.60
alambre dulce #18 0.0840 Lbs 100.00 84.74 15.25 7.12 1.28 8.40
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 Kg/cms2 (1:3:5) 0.0590 m3 6,116.15 5,183.18 932.97 305.81 55.05 360.85
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.40 mts 13.0000 Ud 2.10 1.78 0.32 23.16 4.17 27.33
Andamios 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Herramientas (2%) 0.0200 P.A. 734.50 622.46 112.04 12.45 2.24 14.69
COSTO/MT² 1,596.98 214.06 1,811.04

21.13 Construccion de viga de amarre bajo nivel de piso, de hormigon armado, (0.15mx0.20m) (4 ø 3/8" estribo ø 3/8@0.25cm), acero grado 60, con bastones

Acero - Cuantía QQ/M3 3.6600 QQ 3,800.00 3,220.34 579.66 11,786.44 2,121.56 13,908.00
Vaciado y ligado Hormigón 1:2:4 - 10% desp 1.1000 M3 6,116.15 5,183.18 932.97 5,701.50 1,026.27 6,727.77
Alambre Dulce No. 18 7.3200 LB 100.00 84.74 15.25 620.31 111.66 731.97
Mano de Obra Acero 33.3300 ML 136.01 4,533.26 0.00 4,533.26
Encofrado viga de amarre Todo Costo 33.3300 ML 371.07 12,367.70 0.00 12,367.70
COSTO/MT³ 22,641.51 3,259.48 38,268.70

21.14 Dintel (acero inferior 3 de 1/2") (acero superior 2 de 3/8") (estribos 3/8"@0.20m) (Hormigón 210kg/cm2).

Acero - Cuantía QQ/M3 4.3303 QQ 3,800.00 3,220.34 579.66 13,945.19 2,510.13 16,455.32
Alambre No.18 8.6607 LBS 100.00 84.74 15.25 733.93 132.11 866.03
Hormigon Industrial 280 Kg/cm2 + 10% desp 1.1000 MT³ 8,000.00 6,779.66 1,220.34 7,457.63 1,342.37 8,800.00
M.O acero 26.6667 QQ 136.01 3,626.97 0.00 3,626.97
Encofrado dintel todo costo 26.6667 ML 526.68 14,044.73 0.00 14,044.73
COSTO/MT³ 39,808.44 3,984.61 43,793.06

21.15 Cierre de huecos en blocks 6", Ø3/8" @ 0.60 m & anclaje epóxico

bloques de 0.15 mts (6") TAVARES INDUSTRI 13.0000 Ud 44.00 37.29 6.71 484.75 87.25 572.00
acero 3/8" x 20' -G40 0.1184 QQ 3,800.00 3,220.34 579.66 381.27 68.63 449.90
alambre dulce #18 0.1590 Lbs 100.00 84.74 15.25 13.47 2.43 15.90
mezcla 1:3 0.0250 m3 6,993.84 5,926.98 1,066.86 148.17 26.67 174.85
Hormigón 140 Kg/cms2 (1:3:5) 0.0367 m3 6,116.15 5,183.18 932.97 190.05 34.21 224.26
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.40 mts 13.0000 Ud 2.10 27.33 0.00 27.33
anclaje epóxico 1.0000 Ud 250.00 211.86 38.14 211.86 38.14 250.00
Herramientas (2%) 0.0200 P.A. 1,037.80 879.49 158.31 17.59 3.17 20.76
COSTO/MT² 1,882.26 260.49 2,142.75

C Terminación de Superficies

21.16 Pañete maestreado en muros exteriores (con mortero seco premezclado de agregados de granulometría controlada)

Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 6,312.04 5,349.18 962.85 117.15 21.09 138.23
Regla madera americana cepillada 1"x4" / 2 0.1667 PT 125.00 105.93 19.07 17.66 3.18 20.84
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra empañete exterior 1.0000 M2 187.07 187.07 0.00 187.07
COSTO/MT² 375.34 33.89 409.23

21.17 Pañete maestreado en muros interiores (con mortero seco premezclado de agregados de granulometría controlada) (incluye mochetas) (incluye mochetas)

Mortero 1:4 de empañete 1.75cm + 25% des 0.0219 M3 6,312.04 5,349.18 962.85 117.15 21.09 138.23
Regla madera americana cepillada 1"x4" / 2 0.1667 PT 125.00 105.93 19.07 17.66 3.18 20.84
Andamios en madera 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Mano de obra empañete exterior 1.0000 M2 187.07 187.07 0.00 187.07
COSTO/MT² 375.34 33.89 409.23

21.18 Cantos

madera pino americano cepillada 0.2590 P2 111.11 94.16 16.95 24.39 4.39 28.78
mezcla 1:1.5:5 (pañete) 0.0040 m3 7,513.44 6,367.32 1,146.12 25.47 4.58 30.05
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 58.83 49.86 8.97 1.00 0.18 1.18
COSTO/ML 133.19 9.15 142.34
21.19 Pañete de mochetas (con mortero 1:4)

D Terminación de Pisos

21.2 Suministro y colocación de baldosas de granito para pisos, fondo blanco (0.40mx0.40m), derretido de cemento blanco, (pulido, brillado y cristalizado); juntas de 2mm.

21.21 Suministro y colocación de zócalos de granito, fondo blanco (0.40mx0.07m) con cemento blanco, cristalizado; juntas de 2mm

21.22 Suministro y colocación piso de cerámica de alto tránsito, antideslizante, todo masa, espesor 8mm, formato 0.40mx0.40m, rectificada.
21.23 Losa de piso e=0.10m armado con malla electrosoldada 15x15 (hormigón industrial 210kg/cm2) (incluye separadores).

E Revestimientos

21.24 Suministro y colocación revestimiento de cerámica (0.30mx0.60m), color gris claro, rectificada (colocación junta trabada).

21.25 Suministro y colocación de cantos plástico (color semejante a cerámica) en esquinas cerámicas.
F Pinturas

21.26 Imprimador acrílico de alto desempeño, 100% látex acrílico, resistente a la alcalinidad y a la eflorescencia (capa base, una mano). Incluye preparación de superficie.

21.27 Suministro y aplicación de masillado de muros y techos con masilla resistente a la humedad (incluye preparación de superficie)

21.28 Pintura acrílica en exteriores, calidad superior (dos capas) (incluye preparación de superficie)
Suministro y aplicación de pintura hospitalaria antibacterial y antimicrobiana, acabado semigloss, calidad superior (dos capas) (incluye preparación de superficie) (autoprimer y pintura) (99.9% de efectividad)
21.29 incliuye techos

G Puertas & Ventanas

21.3 Suministro e instalación de puerta (1.20x2.10)m de acero inoxidable grado 316, calibre 19, satinada, cerradura de acero inoxidable, con visor en vidrio laminado de seguridad de 6mm 0.20mx0.55m, reforzada en
área de choque de camillas, con placa de empuje, instalada con cierre oculto en marco superior europea/americana y pivot en piso, con cierre hermético y felpa, garantía de 5 años

21.31 Suministro e instalación de puerta doble (2.00x2.10)m de acero inoxidable grado 316, calibre 19, satinada, cerradura de acero inoxidable, con visor en vidrio laminado de seguridad de 6mm 0.20mx0.55m,
reforzada en área de choque de camillas, con placa de empuje, instalada con cierre oculto en marco superior europea/americana y pivot en piso, con cierre hermético y felpa, garantía de 5 años

Suministro e instalación de puerta plomada (1.20x2.10)m de acero inoxidable grado 316, 1/32", satinada, cerradura de acero inoxidable, instalada con tres bisagras de acero inoxidable por hoja, con cierre
21.32 hermético, lamina de plomo de 2mm, garantía de 5 años
21.33 Suministro e instalación de puerta doble (1.70 x2.10)m, marco de aluminio P40, parte inferior en acero inoxidable grado 316 de 1/16", y parte superior en vidrio laminado de seguridad de 6 mm, con cerradura de
acero inoxidable, con barra de empuje en aluminio, garantía de 5 años

Suministro e instalación de puerta doble (2.00 x2.10)m, marco de aluminio P40, parte inferior en acero inoxidable grado 316 de 1/16", y parte superior en vidrio laminado de seguridad de 6 mm, con cerradura de
21.34 acero inoxidable, con barra de empuje en aluminio, garantía de 5 años
21.35 Suministro e instalación de puerta (1.20x2.10)m, marco de aluminio P40, parte inferior en acero inoxidable grado 316 de 1/16", y parte superior en vidrio laminado de seguridad de 6 mm, con cerradura de acero
inoxidable, con barra de empuje en aluminio, garantía de 5 años

21.36 Suministro e instalación de puerta de 0.70m@1.00m x2.10m, marco de aluminio P40, parte inferior y superior en vidrio laminado de seguridad de 6 mm, con cerradura de acero inoxidable, con barra de empuje
en aluminio, garantía de 5 años (P3)

Suministro e instalación puerta de polimetal (P-4) de 0.70m hasta 1.00m de ancho, con 2.10m de altura, lisa color blanco, llavín tipo palanca de acero inoxidable, con rejilla para ventilación 0.30mx0.30m
21.37 (ambos lados de puerta), con brazo hidráulico en cada hoja y tope fijo en puerta garantía de 5 años

21.38 Suministro y colocación ventana combinada vidrio fijo y ventana proyectada de aluminio P40 con laminado de seguridad, espesor de 6 mm (V-5). Marcos color blanco.
21.39 Suministro e instalación de vidrio fijo en aluminio P-92, con marcos de aluminio de 1 1/2, vidrio con laminado de seguridad de 6mm, marcos color blanco (V-04)

21.4 Suministro e instalación de ventana corredera en aluminio P-92, con marcos de aluminio de 1 1/2, vidrio con laminado de seguridad de 6mm y operadores de palanca en los extremos, marcos color blanco

21.41 Suministro y colocación de laminado de protección solar en ventanas (transmisión de luz visible 5%) (medidas por áreas de vidrio en ventanas)

H Instalación Sanitaria

21.42 Suministro e instalación lavamanos de porcelana sanitaria antibacterial completo, con pedestal, tamaño de mínimo de 54cmx47cm, con mezcladora push temporizado (de latón cromado, resistente a corrosión)
(cierre 15±5s, caudal: 6 l/min regulable) incluye salidas de agua potable y drenaje,
Suministro e instalación de inodoro elongado de porcelana sanitaria antibacterial completo, one piece de tanque, pulsador palanca, tamaño mínimo (76x44x75)cm de bajo consumo y que cumplan con los
21.43 requerimientos para accesibilidad, color blanco, c/asiento y tapa, incluye salida de agua y de drenaje

21.44 Suministro e instalación de desagüe de piso Ø2", PVC SDR 41, rejilla acero inoxidable (cuadrada 4"x4"), sifonada (completa)

21.45 Salida agua potable y desagüe p/meseta en acero inoxidable con fregadero
21.46 Suministro e instalación de cambiador de bebé. Plataforma abatible de polietileno de alta densidad y resistencia. Gran resistencia a impactos, olores y bacterias. Incorpora cinturón de seguridad para sujetar al
bebé, ajustable fácilmente con una sola mano. Color gris claro. Con cavidad para stockar toallas limpias.

21.47 Suministro e instalación de papelera o zafacón en acero inoxidable, accionado de pedal abierto y cierre suave integrado, de metal con tapa. Extraíble forro interior de plástico recoge las fugas y derrames y
protege el basura bolsas de roturas. Funcionamiento silencioso y sistema de amortiguador reduce el ruido. Capacidad 20 lts

21.48 Suministro e instalación de espejo, de 1/4" de espesor con los contornos biselados con distanciadores en acero inoxidables de 1/2" en la parte inferior y de 1" en la parte superior para proporcionar una
inclinación que permita visibilidad para pacientes en silla de ruedas dimensiones: 18" x 36" (46 x 91 cm) ancho y alto.

Suministro e instalación dispensador combi/mixto de rollo o toalla zig-zag. Fabricado en plástico, color blanco de alta calidad y resistencia. Cerradura con llave y opción rollo/bobina o toalla zig-zag. Poco
21.49 voluminoso y fijado a pared mediante tacos y tornillos. Admite 1 Rollo de Papel continuo o anchura 240 mm y Ø 130 mm máximo o 400 toallas de papel tipo Z. Recarga rápida y fácil tanto de rollo/bobina como
de toallas. Fácil mantenimiento y limpieza.
21.5 Jabonera en plástico color blanco p/lavamanos, empotrada en muro

21.51 Dispensador de jabón liquido, de plástico, de 800ml, empotrada en muro

21.52 Secador de manos, secado rápido en acero inoxidable, manos libres automático infrarrojo / 1800w /motor con escobillas/ luz led

Suministro e instalación de porta papeles rollo en continuo. Fabricado en plástico color blanco de alta calidad. Cerradura con llave y visor de control de carga.
21.53 Capacidad rollos de hasta 300m con diámetro máximo de 220 mm. y para rollos con mandril de 45 mm. de diámetro. Fácil limpieza y reposición del rollo. Robusto, resistente y de larga duración. Apertura
batiente frontal.
I Topes y/o Gabinetes en Acero Inoxidable

21.54 Suministro y colocación de mueble en acero inoxidable (tope y gabinete de piso) grado 316 (1.35x0.60)m, una poceta con respaldo en acero inoxidable, sin pocetas, moldeado en una sola pieza sin juntas ni
fisuras, postformado, doble bullnose, puertas con marcos dobles en doble tola de acero inoxidable, tiradores rectos en acero inoxidable. cura

Suministro y colocación de mueble en acero inoxidable (tope y gabinete de piso) grado 316 (1.35x0.60)m, una poceta con respaldo en acero inoxidable, sin pocetas, moldeado en una sola pieza sin juntas ni
21.55 fisuras, postformado, doble bullnose, puertas con marcos dobles en doble tola de acero inoxidable, tiradores rectos en acero inoxidable. yeso

21.56 Suministro y colocación de mueble en acero inoxidable (tope y gabinete de piso) grado 316 (1.35x0.60)m, una poceta con respaldo en acero inoxidable, sin pocetas, moldeado en una sola pieza sin juntas ni
fisuras, postformado, doble bullnose, puertas con marcos dobles en doble tola de acero inoxidable, tiradores rectos en acero inoxidable. medicaicion
21.57 Suministro y colocación de gabinete de pared en acero inoxidable grado 316, calibre 18, moldeado en una sola pieza sin juntas ni fisuras, postformado, doble bullnose, puertas con marcos reforzados en doble
tola de acero inoxidable, tiradores rectos en acero inoxidable

21.58 Construcción de base de hormigón armado con malla electrosoldada p/gabinetes de piso, e=0.10m

J Cortinas Hospitalarias

Cortinas hospitalaria para formar cubículos tipo Oxford, antibacterial y antialergénicas, antihongos y antiacaros, resistente a las manchas, antiestática, libre de olores, color gris (deslizables sobre rieles, con
21.59 malla en la parte superior, retardadora de fuego, lavable y de planchado duradero) Cortina recta (Certificación NFPA 70) Riel de aluminio ancho 3.2cm / alto 2.9cm / grosor 1.3mm. Longitud minima de 2.00m

K Barras de Seguridad

21.6 Barras de apoyo pared-piso en acero inoxidable grado 304 de 1-1/2", en forma de L, longitud de 0.75m, h=0.75m, con cubre falta en las bases de 3"
21.61 Barra de apoyo abatible en acero inoxidable grado 304 de 1 1/4", longitud de 0.75m, de giro vertical, con base atornillable en muro (0.10mx0.25m)

21.62 Barra de apoyo en acero inoxidable grado 304, inclinada en ducha, con cubre falta en las bases de 3"

21.63 Barra de apoyo en acero inoxidable grado 304, recta de 45cm, con cubre falta en las bases de 3"

L Protección de paredes

21.64 Suministro e instalación de esquinero (retenedor en vinil) con cover de vinyl y tapa superior e inferior, color gris oscuro, 2"x2" h=1.80m
Suministro e instalación bumpers tipo pasamanos protector de pared de 5 1/2". Perfil de aluminio firme continuo, parachoque continuo y cubiertas de vinyl rígido resistentes a los rayones y a las manchas. (Ver
21.65 detalles)

21.66 Suministro e instalación de terminales para bumpers

M Construcción Counter en Información y


Admisión

21.67 Muros de bloques de hormigón de 6", bastones ø3/8"@0.40m. (todos los huecos llenos) con resina epoxica

21.68 Pañete en muros interiores maestreado y a plomo (incluye mochetas)


21.69 Cantos (con mortero seco premezclado de agregados de granulometría controlada)

21.7 Tope en granito natural fondo gris oscuro, con terminación doble redondeada (incluye soporte)

21.71 suministro y colocacion de vidrio fijo (tubos de acero inoxidable de 1 1/2 x 1 1/2y conectores media luna )6mm
22.000 Terminación de Techos Exterior

22.01 Remoción de lonas asfáltica, considerar bote

22.02 Demolición de fino y zabaletas (considerar espesor promedio de 10cm) (incluye bajar y acarrear el material)

22.03 Bote de material demolido.

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73

MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

22.04 Desmonte y reinstalación de compresores de aires acondicionados


22.05 Desinstalación, limpieza y reinstalación de tinacos, considere cambios de piezas en salida en PVC, cambio de flota, checker de 1"

22.06 Suministro y aplicación de lechada de cemento gris (pre y/o post construcción de fino)

22.07 Construcción de fino en techo plano (con mortero 1:3) (espesor promedio de 10cm) (con pendiente hacia desagües) semipulido con helicóptero.

madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3 0.0400 m3 6,116.15 5,183.18 932.97 207.33 37.32 244.65
fino en techo horiz. sin incl. subida de mater 1.0000 m2 164.22 164.22 0.00 164.22
Mano de Obra Subida materiales - Ayudant 0.2000 DIA 1,058.75 211.75 0.00 211.75
Herramientas (2%) 0.0200 P.A. 246.27 208.70 37.57 4.17 0.75 4.93
COSTO/MT² 588.85 38.32 627.17

Fino Techo Plano Eprom=0.10m


Volumen Análisis 1.00 M2
Materiales y Equipos
Mortero 1:3 + 10% desp., 6.5 cm espesor 0.072 M3 6,132.22 RD$1,029.57 RD$441.52 RD$74.13
Pino americano cepillado 1"x4"x10' - 10 usos 0.33 PT 105.93 RD$19.07 RD$35.31 RD$6.36
Mano de obra
Mano de obra Fino de mezcla 1.00 M2 RD$165.16 RD$165.16 RD$0.00
Mano de Obra Subida materiales - Ayudante AY 0.10 DIA RD$1,058.75 RD$105.88 RD$0.00
Total/UND RD$747.87 RD$80.49 RD$828.36

22.08 Zabaleta de techo (con mortero 1:3) (0.15mx0.10m)

Mortero 1:3 0.0150 m3 6,116.15 5,183.18 932.97 77.75 13.99 91.74


Mano de Obra 1.0000 ml 87.58 87.58 0.00 87.58
cemento adicional 0.0500 fda 480.00 406.78 73.22 20.34 3.66 24.00
Mano de Obra Subida materiales - Ayudant 0.1000 DIA 1,058.75 105.88 0.00 105.88
Herramientas (2%) 0.0200 P.A. 115.74 98.09 17.66 1.96 0.35 2.31
COSTO/Ml 293.51 18.01 311.52

Zabaleta de Techo
Volumen Análisis 1.00 ML
Materiales y Equipos
Mortero 1:3 + 10% desperdicio 0.015 M3 6,132.22 RD$1,029.57 RD$91.98 RD$15.44
Cemento adicional 0.05 fda RD$381.36 RD$68.64 RD$19.07 RD$3.43
Mano de obra
Mano de obra zabaleta 1.00 ML RD$88.11 RD$0.00 RD$88.11 RD$0.00
Mano de Obra Subida materiales - Ayudante AY 0.02 DIA RD$1,058.75 RD$0.00 RD$21.18 RD$0.00
Total/UND RD$220.34 RD$18.87 RD$239.21

22.09 Construcción de base p/ compresores de A/A (dimensiones 1.00x1.20x0.10m) en hormigón armado f´c=180kg/cm2 con malla electrosoldada 15x15 (incluye zabaleta en perímetro de base).

Zabaleta de techo (con mortero 1:3) (0.15mx0.10m)

Mortero 1:3 0.0150 m3 6,116.15 5,183.18 932.97 77.75 13.99 91.74


Mano de Obra 1.0000 ml 87.58 87.58 0.00 87.58
cemento adicional 0.0500 fda 480.00 406.78 73.22 20.34 3.66 24.00
Mano de Obra Subida materiales - Ayudant 0.1000 DIA 1,058.75 105.88 0.00 105.88
Herramientas (2%) 0.0200 P.A. 115.74 98.09 17.66 1.96 0.35 2.31
COSTO/Ml 293.51 18.01 311.52

Horm. 1:2:4 mezclado a mano + 10% desper 0.1320 m3 6,116.15 5,183.18 932.97 684.18 123.15 807.33
Acero malla D3xD3 (15 x15)cm 0.0125 rollo 15,500.00 13,135.59 2,364.41 164.19 29.56 193.75
Madera de pino americano 1.0000 p2 125.00 105.93 19.07 105.93 19.07 125.00
Zabaleta 4.4000 ml 311.52 264.00 47.52 1,161.58 209.08 1,370.67
Colocac. Acero malla 1.2000 m2 48.14 57.77 0.00 57.77
Piso frotado 1.2000 m2 181.35 217.63 0.00 217.63
Mano de Obra Subida materiales - Ayudant 0.1000 dia 1,058.75 105.88 0.00 105.88
COSTO/UD 2,497.16 380.86 2,878.02

ZABALETA DE TECHO 1.00 ML RD$220.34 RD$18.87 RD$239.21


Zabaleta de Techo
Volumen Análisis 1.00 ML
Materiales y Equipos
Mortero 1:3 + 10% desperdicio 0.015 M3 RD$6,132.22 RD$1,029.57 RD$91.98 RD$15.44
Cemento adicional 0.05 fda RD$381.36 RD$68.64 RD$19.07 RD$3.43
Mano de obra
Mano de obra zabaleta 1.00 ML RD$88.11 RD$0.00 RD$88.11 RD$0.00
Mano de Obra Subida materiales - Ayudante AY 0.02 DIA RD$1,058.75 RD$0.00 RD$21.18 RD$0.00
Total/UND RD$220.34 RD$18.87 RD$239.21

Materiales y Equipos
Horm. 1:2:4 mezclado a mano + 10% desperdicios 0.13 m3 RD$6,103.04 RD$917.28 RD$805.60 RD$121.08
Acero malla D3xD3 (15 x15)cm 0.01 rollo RD$13,135.59 RD$2,364.41 RD$164.19 RD$29.56
Madera de pino americano 1.00 p2 105.93 RD$19.07 RD$105.93 RD$19.07
Zabaleta 4.40 ml RD$220.34 RD$18.87 RD$969.50 RD$83.03
Mano de obra
Colocac. Acero malla 1.200 m2 RD$48.14 RD$0.00 RD$57.77 RD$0.00
Piso frotado 1.200 m2 RD$182.40 RD$0.00 RD$218.88 RD$0.00
Mano de Obra Subida materiales - Ayudante AY 0.10 dia RD$1,058.75 RD$0.00 RD$105.88 RD$0.00
Total/UND RD$2,427.75 RD$252.74 RD$2,680.49

22.1 Construcción de base p/ tinaco (2.00mx2.00mx0.1m)en hormigón armado f´c=180kg/cm2 con malla electrosoldada 15x15 (incluye zabaleta en perímetro de base).

Horm. 1:2:4 mezclado a mano + 10% desper 0.4000 m3 6,116.15 5,183.18 932.97 2,073.27 373.19 2,446.46
Acero malla D3xD3 (10 x10)cm 0.0400 rollo 15,500.00 13,135.59 2,364.41 525.42 94.58 620.00
Madera de pino americano 1.0000 p2 125.00 105.93 19.07 105.93 19.07 125.00
Zabaleta 8.0000 ml 311.52 264.00 47.52 2,111.97 380.15 2,492.12
Colocac. Acero malla 4.0000 m2 48.14 192.56 0.00 192.56
Piso frotado 4.0000 m2 181.35 725.42 0.00 725.42
Mano de Obra Subida materiales - Ayudant 0.1500 dia 1,058.75 158.81 0.00 158.81
COSTO/UD 5,893.38 866.99 6,760.37

Horm. 1:2:4 mezclado a mano + 10% desperdicios 0.40 m3 RD$6,103.04 RD$917.28 RD$2,441.22 RD$366.91
Acero malla D3xD3 (10 x10)cm 0.04 rollo RD$13,135.59 RD$2,364.41 RD$547.32 RD$98.52
Madera de pino americano 1.00 p2 RD$105.93 RD$19.07 RD$105.93 RD$19.07
Zabaleta 8.00 ml RD$220.34 RD$18.87 RD$1,762.72 RD$150.96
Mano de obra
Colocac. Acero malla 4.000 m2 RD$48.14 RD$0.00 RD$192.56 RD$0.00
Piso frotado 4.000 m2 RD$182.40 RD$0.00 RD$729.60 RD$0.00
Mano de Obra Subida materiales - Ayudante AY 0.15 dia RD$1,058.75 RD$0.00 RD$158.81 RD$0.00
Total/UND RD$5,938.16 RD$635.46 RD$6,573.62
22.11 Construcción de juntas (sellado con poliuretano) e=4"

Plancha e=4" foam 3.00mx1.20m 0.1500 UD 2,000.00 1,694.92 305.08 254.24 45.76 300.00
Mano de obra 0.2000 % 300.00 60.00 0.00 60.00
COSTO/UD 314.24 45.76 360.00

Plancha e=4" foam 3.00mx1.20m 0.15 UD RD$ 2,000.00 RD$ 300.00


Mano de obra 0.2 % RD$ 545.66 RD$ 109.13
Total / M RD$ 409.13

22.12 Cubrefalta de aluminio para junta

Longitud (m) 15.8600


Aluminio 1.0000 PLANCHAS 5,000.00 4,237.29 762.71 4,237.29 762.71 5,000.00
Mano de obra 1.2500 FACTOR 3,200.00 4,000.00 0.00 4,000.00
Materiales varios 0.0500 % 3,200.00 160.00 0.00 160.00
COSTO/UD 8,397.29 762.71 9,160.00

Aluminio 1 PLANCHAS RD$ 5,000.00 RD$5,000.00


Mano de obra 1.25 FACTOR RD$ 3,200.00 RD$4,000.00
Materiales varios 0.05 % RD$ 3,200.00 RD$ 160.00
Total RD$9,160.00
Longitud (m) RD$ 15.86
Total / M RD$ 577.55

22.13 Construcción de protector de junta en techo (incluyendo bloques, terminación, Zabaleta, hormigón, placa galvanizada, cantos) (ver planos)

Muro de bloques de 15cm, bastone@0.40m 0.8 M2/M 1,892.75 1,604.03 288.72 1,283.22 230.98 1,514.20
Hormigón armado techo superior 0.07 M3/M 358.05 64.45 25.06 4.51 29.58
Placa galvanizada 1 M/M 174.40 31.39 174.40 31.39 205.79
Pañete 1.64 M2/M 422.50 0.00 0.00 0.00 0.00 0.00
Cantos 3 M/M 205.79 0.00 0.00 0.00 0.00 0.00
COSTO/UD 1,482.68 266.88 1,749.57

Muro de bloques de 15cm, bastone@0.40m 0.8 M2/M RD$ 1,850.00 RD$1,480.00


Hormigón armado techo superior 0.07 M3/M RD$ 14,048.18 RD$ 983.37
Placa galvanizada 1 M/M RD$ 550.00 RD$ 550.00
Pañete 1.64 M2/M RD$ 350.00 RD$ 574.00
Cantos 3 M/M RD$ 180.00 RD$ 540.00
Total / M RD$4,127.37

Suministro y colocación de impermeabilizante de techo con lona asfáltica granulada de 5 kg/cm2 (procedencia europea), (a ser colocado toda la membrana adherida a la superficie, sin arrugas, con
22.14 imprimación a dos manos de emulsiones asfálticas de calidad superior, con solapes de 10 cm en las uniones completa, con el selle del borde del solape), debe incluir prueba de estanqueidad para todas las áreas
impermeabilizadas, incluye limpieza de superficie, garantía de diez años.
23.000 AREAS EXTERIORES

23.01 Construcción de acera en hormigón armado con malla electrosoldada , D2.3 x 2.3 10x10CMS, H.I. 180 Kg/cm2 (frotada y violinada).

Rampa Personas Con Discapacidad. Construcción área de descanso (1.80x3.30) mts y construcción rampa de minusválidos para una pendiente de 8% y L= 10 mts, divida de en dos tramos. inc. replanteo y
23.02 marcado, inc. excavación en tierra, relleno de reposición, zapata de muros (0.45x0.25) mts, dos (2) líneas de blocks 6", fraguache, pañete liso en muros b.n.p., cantos, rampa de hormigón (e=0.10 mts), 180
kg/cm2 (ligadora), malla electrosoldada D2.3x2.3 20x20, terminación frotada, recolección y traslado de escombros en carretillas hasta punto de bote, limpieza, herramientas y mano de obra.

23.03 Suministro e instalación de baldosas de vibrazo para pisos, (0.40mx0.40m), derretido, juntas de 2mm.

23.04 sum inistro y colocacion de pasamanos de acero inoxidable en rampa


23.05 Suministro y colocación de señalización vertical 0.40mx0.60m (incluyendo base y fijación mediante pernos).

23.06 Señalización horizontal parqueo con pintura de trafico (blanca/amarilla)

24.000 Paisajismo

24.01 Tierra negra (suministro, transporte y regado)

24.02 Suministro y colocación grama enana (incluyendo mantenimiento hasta recepción)


24.03 Tu y Yo (de funda mediana)

24.04 Arbolitos chinos

24.05 Arrayan (tres bolas)

24.06 Cyca revoluta

24.07 Palma areca de 5'


24.08 Trinitaria (funda mediana)

24.09 Gravilla blanca decorativa, e=5 cms

25.000 Misceláneos

25.01 Suministro y colocación de paragomas de hormigón (incluye fijación, terminación y pintura). 12.00 cm x 2.00 m.

25.02 Limpieza continua y final


25.03 Suministro e instalación de equipos de protección colectiva (delimitaciones, mallas plásticas, señalizaciones de seguridad), incluye equipos de protección personal, de acuerdo con reglamento 522-06

26.000 INSTALACIONES ELÉCTRICAS

A Media Tensión

26.001 Suministro e instalación de Estructura LB608 - Norma DECON

26.002 Suministro e instalación de Estructura PR-202 (Montaje de base para seccionador fusible y pararrayos - fijación en cruceta) Norma DECON

26.003 Suministro e izaje de HPV-40-500 (Poste de hormigón pretensado vibrado de 40 pies y 500 daN)
26.004 Excavacion para poste de media tensión

EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos

MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32

Sub-Total (3) Mano de Obra 449.32 0.00 449.32

COSTO/MT³ 456.93 1.37 458.30

26.005 PR-101 (Puesta a tierra interior para poste)

26.006 Cimentación de poste

Bajada y subida de acometida de media tensión, Inlcuye: 02 - Conectores recto PVC de 3", 02 - Condulet 3" para IMC, 02 - Curva PVC de 3", 04 - Tubos IMC de 3", 02 - Curva IMC de 3", 02 - Conector HUB de 3",
26.007 02 - Coupling IMC de 3", 03 - Cono de alivio completo (con la varilla terminal), 03 - Elbow conector, 15 - Abrazadera Unistrut de 3", 02 - Riel chanel de 1/2", 30 - Tornillo cabeza hexagonal 1/4 x 2 " con tarugo y
arandela, 01 - Instalacion de terminacion a cable URD, 01 - Fijacion de tuberia IMC
26.008 Zanja IC-302 de 1.20m x 0.4m (Incluye tuberia PVC de 3")

26.009 Conductor URD AWG NO. 2 XLPE al 33% (enchaquetado)

Registros manhole (para media tensión), Incluye:


26.01 1- Registro manhole de piso 1.20m x 1.20 m x 1.45m (terminado dentro) con Tapa de concreto de 1.50m x 1.50m x 0.12m
Gravilla - 0.9 m³

26.011 Suministro e instalación de Transformador tipo pad mounted de 150kVA, 12.47/7.2kV - 208/120V, delta-delta, radial feed, frente muerto, sumergido en aceite.

Aterrizaje para transformador compuesto por:


4 Varillas de tierra 5/8 x 8
26.012 4 Conectores para varilla de tierra
30 pies de alambre desnudo de cobre 7 hilos

Generador Eléctrico de 175kVA-208/120Vac, 60Hz. 3F.


Consumo máximo de combustible de:
- 28 gal/h al 100% de la carga,
- 21 gal/h al 75% de la carga,
- 9.93 gal/h al 50% de la carga.
Gobernador Electrónico, Máxima potencia acústica de 70dB, Grado de protección mecánica del generador IP23, Regulación de voltaje automática, Distorsión armónica menor a un 2%, Velocidad de sobregiro
2250 rpm, Banco de baterias de 12/24 Vdc,
B Generador
Controlador con protecciones contra:
- Fallo de arranque
- Baja presión de aceite
26.013 - Baja tensión de batería
- Baja/alta frecuencia
- Sobregiro
- Alta temperatura de refrigerante
Controlador con medidores de:
- Tension entre lineas
- Tension linea-neutro
- Corrientes/-Frecuencia
- Potencia Aparente, activa y reactiva
- Factor de potencia
Sistema de combustible para Generador de 175kVA, que incluye:
1-Tanque de combustible de 800 Gls.
26.014 1-Tanque de combustible uso diario de 200 Gls. (Generador 175kVA)
Sistema de llenado automático desde tanque de combustible de 800Gls hasta tanques de combustible de uso diario, usando: electroválvulas, sensores de nivel y caja de control.
Materiales misceláneos (filtros de línea, tubería HN, válvulas, codos, niples, mangueras, bomba de combustible y todo lo necesario para su instalación).

C Sistema de Puesta a Tierra

26.015 Cable AWG No. 3/0 CU desnudo

26.016 Electrodo de Aterrizaje de 5/8" x 8´


26.017 Soldadura exotérmica

26.018 Conector de doble ojo # 3/0 AWG

26.019 Tornillo de acero inoxidable de 1/2" x 2 1/2" completo


26.02 Aditivo GEL para mejorar condicion de resistividad del terreno 25LB

26.021 Barra master ground de 12" x 3" x 1/4"

26.022 Registro de medición de tierra construido con Tubo PVC de 8" y tapa roscable

26.023 Hoyo de 6" para Electrodo de tierra


26.024 Tubo PVC de 3/4"

26.025 Excavación en roca de 1 metro cubico con compresor

26.026 Curva PVC de 3/4"


26.027 Misceláneos de puesta a tierra

26.028 Mano de obra instalación de puesta a tierra.

D Equipos BT

26.029 Suministro e Instalación de Encloused Breaker de 400 Amperes, trifásico, 120/208Vac. 60Hz. Barra de neutro para 100% de la carga. En gabinete Nema 1 pintado con pintura electrostática en polvo, secada en
horno a 200 grados Celsius.
26.03 Suministro e Instalación de Interruptor de Transferencia Automática (ITA) con breaker motorizado de 400 Amperes, trifásico, 120/208Vac., 3Ph. 60Hz. Con barra de Cobre para 600 Amperes de 1 ½˝ x ¼˝. Barra
de neutro para 100% de la Carga. En gabinete Nema 1 pintado con pintura electrostática en polvo, secada en horno a 200 grados Celsius.

26.031 Suministro e Instalación de Interruptor de Transferencia Manual (ITM) con breaker de 400 Amperes, trifásico, 120/208Vac., 3Ph. 60Hz. Con barra de Cobre para 600 Amperes de 1 ½˝ x ¼˝. Barra de neutro para
100% de la Carga. En gabinete Nema 1 pintado con pintura electrostática en polvo, secada en horno a 200 grados Celsius.

Suministro e Instalación de Encloused Breaker de 400 Amperes, trifásico, 208/120Vac. 60Hz. En gabinete Nema 3, con tola mínimo 16, pintado con pintura electrostática en polvo, secada en horno a 200 grados
26.032 Celsius. Con doble cierre, dos portacandados con Planchuela de Hierro de 2˝x 3/16˝ con agujero para ⅜˝. Además, con Cerradura de puño con cierre en tres puntos, con Planchuela de 1˝x 3/16˝. (Receptáculo
móvil)
Suministro e instalación de Panel Board General de 400 Amperes, trifásico, 208/120Vac., 3Ph. 60Hz. Con barra de Cobre para 600 Amperes de 1 ½˝ x ¼˝. En gabinete Nema 1 pintado con pintura electrostática
en polvo, secada en horno a 200 grados celsius. Compuesto por:
MBP.400A/3,
02 Breakers 170A/3P
26.033 02 Breakers 150A/3P
01 Breakers 100A/3P
01 Breakers 70A/3P
05 Breakers 40A/3P
02 Disponible

Suministro e instalación de Panel Board Emergencia Nema 1 de125 Amperes, trifásico, 208/120Vac., 3Ph. 60Hz. Con barra de Aluminio para 225 Amperes de ¾˝ x ¼˝ y Planchuela de aluminio de 1˝ x ⅛˝. En
gabinete Nema 1 pintado con pintura electrostática en polvo, secada en horno a 200 grados celsius. Compuesto por:
26.034 MBP.125A/3,
01 Breakers 60A/3P
04 Breakers 40A/3P
03 Disponible

E Paneles de Distribución

26.035 PA1-Panel de Iluminación, trifásico, con barras de aluminio de 125 amp. De 12 espacios. Compuesto por:
10 Breaker 20A/1

PEB1-Panel de Tomacorrientes, trifásico, con barras de aluminio de 125 amp. De 18 espacios. Compuesto por:
26.036 08 Breaker 20A/1
PUPS1-Panel de Tomacorrientes UPS, trifásico, con barras de aluminio de 125 amp. De 18 espacios. Compuesto por:
26.037 12 Breaker 20A/1
01 Breaker 40A/3

26.038 PC1-Panel Climatización, trifásico, con barras de aluminio de 225 amp. De 54 espacios. Compuesto por: 19 Breaker 20A/2, 01 Breaker 30A/2,

F Alimentadores

26.039 Alimentador desde Transformador pad mounted de 150kVA a Enclosed breaker de transformador a 400A, compuesto por: 3 Alambre AWG No. 2/0 THHN por fase 3 Alambre AWG No. 2/0 THHN neutro 1
Alambre AWG No. 1/0 THHN tierra 2 tubería IMC 3".

26.04 Alimentador desde Enclosed breaker de transformador a Interruptor de transferencia automática (ITA), compuesto por: 3 Alambre AWG No. 2/0 THHN por fase 3 Alambre AWG No. 2/0 THHN neutro 1
Alambre AWG No. 1/0 THHN tierra 2 tubería IMC 3".
Alimentador desde Interruptor de transferencia automática (ITA) a Interruptor de transferencia manual (ITM), compuesto por: 3 Alambre AWG No. 2/0 THHN por fase, 3 Alambre AWG No. 2/0 THHN neutro,
26.041 1 Alambre AWG No. 1/0 THHN tierra, 2 tubería EMT 3".

Alimentador desde Interruptor de transferencia manual (ITM) a Enclosed breaker de generador, compuesto por: 3 Alambre AWG No. 2/0 THHN por fase, 3 Alambre AWG No. 2/0 THHN neutro, 1 Alambre
26.042 AWG No. 1/0 THHN tierra, 2 tubería EMT 3".

Alimentador desde Enclosed breaker de generador a Generador, compuesto por: 3 Alambre AWG No. 2/0 THHN por fase, 3 Alambre AWG No. 2/0 THHN neutro, 1 Alambre AWG No. 1/0 THHN tierra, 2
26.043 tubería EMT 3".

26.044 Alimentador desde Interruptor de transferencia manual (ITM) a Receptáculo Móvil, compuesto por: 3 Alambre AWG No. 2/0 THHN por fase, 3 Alambre AWG No. 2/0 THHN neutr, 1 Alambre AWG No. 1/0
THHN tierra, 2 tubería EMT 3".
26.045 Alimentador desde Interruptor de transferencia automática (ITA) a Panel Board de Emergencia, compuesto por: 3 Alambre AWG No. 2/0 THHN por fase, 3 Alambre AWG No. 2/0 THHN neutro, 1 Alambre AWG
No. 1/0 THHN tierra, 2 tubería PVC/EMT 3".

26.046 Alimentador desde Panel board de Emergencia a PA Panel de iluminacion, compuesto por: 1 Alambre AWG No. 8 THHN por fase, 1 Alambre AWG No. 8 THHN para neutro, 1 Alambre AWG No. 10 THHN tierra,
1 tubería EMT 1".

26.047 Alimentador desde Panel board de Emergencia a PB Panel de Tomacorriente, compuesto por: 1 Alambre AWG No. 8 THHN por fase, 1 Alambre AWG No. 8 THHN para neutro, 1 Alambre AWG No. 10 THHN
tierra, 1 tubería EMT 1".

26.048 Alimentador desde Panel Board de Emergencia a Panel de Climatización, compuesto por: 2 Alambre AWG No. 1/0 THHN por fase, 2 Alambre AWG No. 1/0 THHN neutro, 1 Alambre AWG No. 3/0 THHN tierra,
1 tubería IMC 2".

Alimentador desde Panel board de Emergencia a PUPS Panel de tomacorriente de UPS, compuesto por: 1 Alambre AWG No. 8 THHN por fase, 1 Alambre AWG No. 8 THHN para neutro, 1 Alambre AWG No. 10
26.049 THHN tierra, 1 tubería EMT 1".
G Sistema de Alimentación Ininterrumpida (UPS)

Suministro e instalación de UPS-10 kVA, 208/120Vac., (3Ph + N + T), 60Hz, Topología: Doble conversión el línea, garantía de un año en piezas y servicios. Incluye: Serie de baterias modulares inteligentes de
26.05 7.2Ah internas, Autonomía: de 15 minutos (minimo) al 100% de la carga. Incluye instalación, arranque y materiales.

Suministro e instalación de Sistema General de By-Pass para UPS de 40A/3, 208/120Vac., 3Ph. 60Hz. Nema 1, incluye:
1 Breaker Normal 40A/3
1 Breaker Bypass 40A/3
26.051 1 Breaker UPS 40A/3
2 Luces indicadoras
2 Interruptor frontal
Embarrado y conectores para 100% de la carga.

Alimentador desde Bypass UPS 40A a PUPS-Panel de Tomacorrientes UPS1 compuesto por:
1 Alambre AWG No. 8 THHN por fase
26.052 1 Alambre AWG No. 8 THHN neutro
1 Alambre AWG No. 10 THHN tierra
1 tubería EMT 1".

H Salidas Eléctricas

26.053 Salida cenital en tuberia EMT de 3/4" para Luminaria


26.054 Salida de pared en tuberia EMT de 3/4" para Luminaria

26.055 Bajante de 4' para Luminaria Empotrada

26.056 Salida para Interruptor Sencillo Aterrizado, 15A, 120V - Incluye accesorio Termoplástico con placa frantal sin tornillos con terminación en blanco

26.057 Salida para Interruptor Doble Aterrizado 15A, 120V - Incluye accesorio Termoplástico con placa frantal sin tornillos con terminación en blanco

26.058 Salida para Interruptor Triple Aterrizado 15A, 120V - Incluye accesorio Termoplástico con placa frantal sin tornillos con terminación en blanco

26.059 Salida para Tomacorriente Doble Aterrizado 15A, 120V - Incluye accesorio Termoplástico con placa frantal sin tornillos con terminación en blanco

26.06 Salida para Tomacorriente Doble Aterrizado 15A Grado Hospitalario, 120V - Incluye accesorio Termoplástico con placa frantal sin tornillos con terminación en blanco
26.061 Salida para Tomacorriente Doble Aterrizado 15A para UPS, 120V - Incluye accesorio Termoplástico con placa frantal sin tornillos con terminación en naranja

26.062 Salida para Tomacorriente Doble Aterrizado 15A Grado Hospitalario para UPS, 120V - Incluye accesorio Termoplástico con placa frantal sin tornillos con terminación en naranja

26.063 Salida de extractor de baño de plafón 11"x11" . Incluye extractor y ventanilla exterior.

26.064 Salida para Punto de data, Camara y Control de acceso. Incluye cable UTP Cat 6 y Faceplate con puerto RJ45.

I Suministro e Instalación

26.065 Suministro e instalación de Lámpara Led Adosada 2x2´ Tipo Panel Sellado, 48VA, 80-240V, 60Hz, 6000-7000K, lúmenes ≥ 3200, 80RA, IP20.

26.066 Suministro e instalación de Lámpara Led empotrada 2x4’ Tipo Panel Sellado, 62VA, 80-240V, 60HZ, 6000-7000K, lúmenes ≥ 6000 Lum, IRC ≥ 80, IP44.

26.067 Suministro e instalación de Downlight Led empotrada redonda con 6’’-9’’ de diámetro, 23VA, 120V, 60HZ, 6000-7000K, lúmenes ≥ 400 Lum, IRC ≥ 80, IP54.

Suministro e instalación de Lámpara de Emergencia de dos luces, auto- energizadas (con baterías incorporadas), autonomía mínima de dos horas de funcionamiento (120 min). 5.4W, 120-277V. Adosada a la
26.068 pared, a instalar a 20 cm B.N.P.T.

26.069 Suministro e instalación de Fotocelda para luminaria exterior 120V, IP65, 1000W.
J Sistema de Vigilancia IP

26.07 Patch cord cat-6 (cable flexible de alta calidad. Patch cords acabados y probados) (aliviador de tensión moldeado en caliente).

26.071 Escalerilla 6" x 10'

26.072 Pacht Panel 24 puertos

26.073 Organizador

26.074 NVR de 16 Canales, que soporte hasta 16 cámaras, compresión H.264, hasta 10 TB de capacidad para cada HDD, exportación de video AVI/RAW. Resolución Máxima Local: hasta 4MP; Remoto: hasta10MP.
Zoom digital. Compresión de audio PCM, G.711. Con 2 puerto(s), USB 2.0. Puerto HDMI (3 años de garantía) (Licencia libre de 16 canales incluida).
26.075 Disco duro 4 TB, Buffer 64MB, Dispositivo compatible: grabadora de video en red, capacidad de almacenamiento 4TB, disco duro especial para vigilancia, interfaz de unidad SATA, tamaño de HDD de 3.5". SATA
6.0 Gb/s, velocidad 5400 rpm.

26.076 Cámara IP Tipo Bullet, 2 Megapíxel, día/noche con IR LED adaptativo hasta 40 metros, lente 2.8mm-12mm, IP66, PoE.

26.077 Cámara IP Tipo Domo, 2 Megapíxel, día/noche con IR LED adaptativo hasta 30 metros, lente 2.8mm-12mm, PoE.

26.078 Gabinete 12 U, instalación estándar de 19¨, paneles laterales extraíbles, cerraduras laterales, entrada de cable en la cubierta superior y el panel inferior, protección IP20.
26.079 Pantalla 32¨, Led, resolución 1080p, entrada HDMI, entrada VGA.

26.08 Switch de 24 puertos, PoE 10/100TX+2 10/100/1000TX compartidos 2 1000X, administrado, estándar 802,3at/af, total de PoE 360 vatios, temperatura de funcionamiento 0-50 ºC.

26.081 Tubería EMT de 1"

26.082 Registro NEMA 1 24''x24''x8''

26.083 Registro NEMA 1, 8''x8''x6''


26.084 Abrazadera Unistrut 1"

26.085 Soporte Channel Unistrut 3/4"

26.086 Barra roscada de 3/8

26.087 Fibra Optica

26.088 Suministro e instalación de cableado con cable UTP cat 6 (alta calidad hasta punto de salida
26.089 Suministro e instalación de Face plate

K Sistema de Control de Acceso


Sistema de Control de Acceso Empleados, Incluye: -Reloj Biométrico. -Nueva generación de sensor: totalmente sellado, aprueba de polvo, agua y rayones. -Pantalla LCD 128x64. -Formas de identificación: Id,
Clave ID + Huella digital. -Capacidad de registro: 50000. -USB + Puerto USB (memorias USB).
26.09 -Batería recargable para emergencias o portabilidad.
-Hasta 2000 huellas digitales.
-Control de acceso para cuatro (4) puertas.

26.091 Instalación, configuración y entrenamiento de sistema de control de acceso.

L Climatización

26.092 Salida eléctrica en alambre No. 10 para alimentación de aire acondicionado en tuberia IMC/LT de 3/4

26.093 Preinstalación y desgue de aire acondicionado, incluye: 2'' de tubería PVC de 2'' para tubería de cobre 2'' de tubería PVC de 3/4'' para alambre de goma 4'' de tubería PVC de 3/4'' para desague 3 curva PVC de
2'' 1 curva PVC de 3/4'' 3'' alambre de goma 14/3.

26.094 Suministro e instalación de Unidad de aire acondicionado tipo Split Inverter de 12mil BTU SEER +18
26.095 Suministro e instalación de Unidad de aire acondicionado tipo Split Inverter de 18mil BTU SEER +18.

26.096 Suministro e instalación de Unidad de aire tipo fan coil de 1 TON.

26.097 Suministro e instalación de Unidad de aire tipo fan coil de 4 TON.

26.098 Desconectivo 20A/2

ANALISIS VARIOS

Excavación de material (incluye acopio de material) (a mano)

EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos

MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32

Sub-Total (3) Mano de Obra 449.32 0.00 449.32

COSTO/MT³ 456.93 1.37 458.30

Material de asiento p/tubería

PALA "TRAMONTINA" 0.0100 UD 775.00 656.78 118.22 6.57 1.18 7.75


PICO "TRAMONTINA" 0.0100 UD 1,121.00 950.00 171.00 9.50 1.71 11.21
regado, nivelado y apisonado de relleno 1.2000 m3 76.00 91.20 0.00 91.20
arena gruesa ITABO (de mina) 1.0000 m3 1,200.00 1,200.00 0.00 1,200.00
Herramientas (2%) 0.0200 P.A. 1,218.96 1,033.02 185.94 20.66 3.72 24.38
COSTO/MT³ 1,327.93 6.61 1,334.54

Relleno de reposición traslado,regado y comp.

PALA "TRAMONTINA" 0.0100 UD 775.00 656.78 139.50 7.75 1.40 7.75


PICO "TRAMONTINA" 0.0100 UD 1,121.00 950.00 201.78 11.21 2.02 11.21
Regado, nivelado y apisonado de relleno 1.2000 m3 120.00 144.00 0.00 144.00
Herramientas (2%) 0.0200 P.A. 18.96 16.07 3.41 0.38 0.07 0.38
COSTO/MT³ 163.34 3.48 163.34

Bote de material

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 2.09 1,013.73

MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

Hormigón 100 KG/cms2 (Ligadora)

Materiales:
cemento gris 6.3500 Fds 480.00 406.78 73.22 2,583.05 464.95 3,048.00
arena gruesa ITABO LAVADA (de PLANTA) 0.5400 m3 1,500.00 810.00 0.00 810.00
gravilla 3/4 @ 3/8" 0.7300 m3 1,500.00 1,095.00 0.00 1,095.00
agua 64.0000 Gls 1.00 64.00 0.00 64.00
SUB-TOTAL DE MATERIALES 5,017.00

Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 245.53 245.53 0.00 245.53
Ayudante albañil (1) 1.0000 Hr. 132.34 132.34 0.00 132.34
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 477.30
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 272.75

Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 423.73 76.27 423.73 76.27 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA 285.71
HERRAMIENTAS: 5 % M.O. 13.64
SUB-TOTAL DE EQUIPOS 299.35

costo/m3 3,557.10
costo/m2 177.85

Hormigón 140 KG/cms2 (Ligadora)

Materiales:
cemento gris 7.5300 Fds 480.00 406.78 73.22 3,063.05 551.35 3,614.40
arena gruesa ITABO LAVADA (de PLANTA) 0.5200 m3 1,500.00 780.00 0.00 780.00
gravilla 3/4 @ 3/8" 0.7300 m3 1,500.00 1,095.00 0.00 1,095.00
agua 54.6500 Gls 1.00 54.65 0.00 54.65
SUB-TOTAL DE MATERIALES 5,544.05

Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 245.53 245.53 0.00 245.53
Ayudante albañil (1) 1.0000 Hr. 132.34 132.34 0.00 132.34
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 477.30
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 272.75

Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 423.73 76.27 423.73 76.27 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA 285.71
HERRAMIENTAS: 5 % M.O. 13.64
SUB-TOTAL DE EQUIPOS 299.35

costo/m3 6,116.15

Hormigón 180 KG/cms2 (Ligadora)

Materiales:
cemento gris 8.3100 Fds 480.00 406.78 73.22 3,380.34 608.46 3,988.80
arena gruesa ITABO LAVADA (de PLANTA) 0.5100 m3 1,500.00 765.00 0.00 765.00
gravilla 3/4 @ 3/8" 0.7100 m3 1,500.00 1,065.00 0.00 1,065.00
agua 51.2200 Gls 1.00 51.22 0.00 51.22
SUB-TOTAL DE MATERIALES 5,870.02
Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 245.53 245.53 0.00 245.53
Ayudante albañil (1) 1.0000 Hr. 132.34 132.34 0.00 132.34
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 290.57
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 166.04

Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 423.73 76.27 423.73 76.27 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA 285.71
HERRAMIENTAS: 5 % M.O. 8.30
SUB-TOTAL DE EQUIPOS 294.02

costo/m3 6,330.08

Hormigón 210 KG/cms2 (Ligadora)

Materiales:
cemento gris 8.9400 Fds 480.00 406.78 73.22 3,636.61 654.59 4,291.20
arena gruesa ITABO LAVADA (de PLANTA) 0.5100 m3 1,500.00 765.00 0.00 765.00
gravilla 3/4 @ 3/8" 0.7000 m3 1,500.00 1,050.00 0.00 1,050.00
agua 51.2200 Gls 1.00 51.22 0.00 51.22
SUB-TOTAL DE MATERIALES 6,157.42

Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 245.53 245.53 0.00 245.53
Ayudante albañil (1) 1.0000 Hr. 132.34 132.34 0.00 132.34
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 290.57
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 166.04

Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 423.73 76.27 423.73 76.27 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA 285.71
HERRAMIENTAS: 5 % M.O. 8.30
SUB-TOTAL DE EQUIPOS 294.02

costo/m3 6,617.48

Muro de bloques de 15 cms Ø3/8" @ 0.60 m

bloques de 0.15 mts (6") TAVARES INDUSTRI 13.0000 Ud 44.00 37.29 6.71 484.75 87.25 572.00
acero 3/8" x 20' -G40 0.1184 QQ 3,800.00 3,220.34 579.66 381.27 68.63 449.90
alambre dulce #18 0.1590 Lbs 100.00 84.74 15.25 13.47 2.43 15.90
mezcla 1:3 0.0250 m3 6,993.84 5,926.98 1,066.86 148.17 26.67 174.85
Hormigón 140 Kg/cms2 (1:3:5) 0.0367 m3 6,116.15 5,183.18 932.97 190.05 34.21 224.26
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.40 mts 13.0000 Ud 2.10 27.33 0.00 27.33
Herramientas (2%) 0.0200 P.A. 1,037.80 879.49 158.31 17.59 3.17 20.76
COSTO/MT² 1,670.39 222.36 1,892.75

Pañete maestreado y a plomo

madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 187.07 187.07 0.00 187.07
andamios 1.0000 M2 63.09 53.47 9.62 53.47 9.62 63.09
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/MT² 386.59 35.91 422.50

Cantos

madera pino americano cepillada 0.8300 P2 125.00 105.93 19.07 87.92 15.83 103.75
mezcla 1:1.5:5 (pañete) 0.0050 m3 3,457.52 2,930.10 527.42 14.65 2.64 17.29
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 121.04 102.57 18.46 2.05 0.37 2.42
COSTO/ML 186.96 18.83 205.79

mezcla 1:3

cemento gris 11.5100 Fds 480.00 406.78 73.22 4,682.03 842.77 5,524.80
arena gruesa ITABO (de mina) 1.0000 m3 1,200.00 1,200.00 0.00 1,200.00
agua 69.0400 Gls 1.00 69.04 0.00 69.04
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 6,362.95 842.77 7,205.72

mezcla 1:3-A

cemento gris 11.5100 Fds 480.00 406.78 73.22 4,682.03 842.77 5,524.80
arena gruesa ITABO LAVADA (de PLANTA) 1.0000 m3 1,200.00 1,200.00 0.00 1,200.00
agua 69.0400 Gls 1.00 69.04 0.00 69.04
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 6,362.95 842.77 7,205.72

mezcla 1:4

cemento gris 9.5000 Fds 480.00 406.78 73.22 3,864.41 695.59 4,560.00
arena gruesa ITABO (de mina) 1.0600 m3 1,200.00 1,272.00 0.00 1,272.00
agua 68.1600 Gls 1.00 68.16 0.00 68.16
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 5,616.44 695.59 6,312.04

mezcla 1:6

cemento gris 6.4600 Fds 480.00 406.78 73.22 2,627.80 473.00 3,100.80
arena gruesa ITABO (de mina) 1.1200 m3 1,200.00 1,344.00 0.00 1,344.00
agua 67.7200 Gls 1.00 67.72 0.00 67.72
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 4,451.39 473.00 4,924.40

mezcla 1:10

cemento gris 6.4500 Fds 480.00 406.78 73.22 2,623.73 472.27 3,096.00
arena gruesa ITABO (de mina) 1.1500 m3 1,200.00 1,380.00 0.00 1,380.00
agua 40.0000 Gls 1.00 40.00 0.00 40.00
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 4,455.60 472.27 4,927.88

mezcla 1:1.5:5 (pañete)

cemento gris 9.4600 Fds 480.00 406.78 73.22 3,848.14 692.66 4,540.80
arena FINA (para pañete) 0.9100 m3 1,200.00 1,092.00 0.00 1,092.00
cal (50 LBS) 6.2900 Fds 260.00 220.34 39.66 1,385.93 249.47 1,635.40
agua 45.2400 Gls 1.00 45.24 0.00 45.24
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 2,935.05 249.47 3,184.52

mezcla 1:1.5:5 (pañete) CON ARENA GRUESA

cemento gris 9.4600 Fds 480.00 406.78 73.22 3,848.14 692.66 4,540.80
Arena lavada 0.9100 m3 1,500.00 1,365.00 0.00 1,365.00
cal (50 LBS) 6.2900 Fds 260.00 220.34 39.66 1,385.93 249.47 1,635.40
agua 45.2400 Gls 1.00 45.24 0.00 45.24
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 3,208.05 249.47 3,457.52

mezcla 1:2:5 (pañete en techo)

cemento gris 11.9700 Fds 480.00 406.78 73.22 4,869.15 876.45 5,745.60
arena FINA (para pañete) 0.8700 m3 1,500.00 1,305.00 0.00 1,305.00
cal (50 LBS) 6.0000 Fds 260.00 220.34 39.66 1,322.03 237.97 1,560.00
agua 43.1200 Gls 1.00 43.12 0.00 43.12
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 3,082.03 237.97 3,320.00

mezcla para natilla

cemento gris 40.6100 FDS 480.00 406.78 73.22 16,519.32 2,973.48 19,492.80
agua 121.5200 GLS 1.00 121.52 0.00 121.52
COSTO/Mt³ 16,640.84 2,973.48 19,614.32

mezcla 1:2

cemento gris 15.5700 Fds 480.00 406.78 73.22 6,333.56 1,140.04 7,473.60
arena gruesa ITABO (de mina) 0.9000 m3 1,200.00 1,080.00 0.00 1,080.00
agua 70.1000 Gls 1.00 70.10 0.00 70.10
M.O. Mezclado 0.5000 DIA 823.75 411.88 0.00 411.88
COSTO/Mt³ 7,895.53 1,140.04 9,035.58

Andamios Interiores

Madera Pino Americano Bruta 0.1820 P2 125.00 105.93 19.07 19.28 3.47 22.75
Colocación Andamio Interior 0.02 dia 1,964.25 39.29 0.00 39.29
Clavo corriente 0.010 LBS 60.00 50.85 9.15 0.51 0.09 0.60
Herramientas (2%) 0.0200 P.A. 22.75 19.28 3.47 0.39 0.07 0.46
COSTO/MT² 59.46 3.63 63.09

Andamios madera para colocación bloques


Volumen Análisis 1.00 M2
Materiales y Equipos
Madera bruta 6 usos 0.08 PT RD$105.93 RD$19.07 RD$8.83 RD$1.59
Clavos corriente 0.042 LBS RD$50.85 RD$9.15 RD$2.12 RD$0.38
Mano de Obra
Confección andamios - T1 0.02 DIA RD$1,964.25 RD$0.00 RD$39.29 RD$0.00
Total/UND RD$50.24 RD$1.97 RD$52.21

Hormigón armado techo superior junta

Acero de 3/8" grado 60 1.12 QQ 3,800.00 3,220.34 579.66 3,606.78 649.22 4,256.00
Desp Acero (5% desp.) 0.056 QQ RD$ 4,256.00 3,606.78 649.22 201.98 36.36 238.34
M.O. acero 16.6666666666667 M RD$ 136.01 115.26 20.75 1,921.06 345.79 2,266.86
Alambre #18 (2lb/qq) 2.24 LB RD$ 100.00 84.74 15.25 189.82 34.17 223.99
Carpintería (todo costo) 16.6666666666667 M 0.00 0.00 0.00 0.00 0.00
Horm. 210 Kg/Cm² 1 M3 0.00 0.00 0.00 0.00 0.00
Desp 'Horm. 210 Kg/Cm²+10% 0.05 M3 0.00 0.00 0.00 0.00 0.00
COSTO/Mt³ 5,919.65 1,065.54 6,985.18
I REHABILITACION

1 PRELIMINARES

1.1 ACTIVIDADES DE INICIO

1.101 S/C Letrero De Alcance De Obra (Completo)

Arte e impresión en vilnil y colocación 1.0000 PA 26,500.00 22,457.62 4,042.37 22,457.62 4,042.37 26,500.00
Estructura metálica todo costo 1.0000 PA 30,000.00 25,423.73 4,576.27 25,423.73 4,576.27 30,000.00
COSTO/UD 47,881.35 8,618.64 56,500.00

1.102 Caseta De Materiales (4.0 X 7.0 Mts)

Plywood 3/4 ( 2 usos) 84.0000 m2 674.63 571.72 102.91 48,024.31 8,644.38 56,668.69
Clavos de Zinc 18.0000 LBS 120.00 101.69 18.31 1,830.51 329.49 2,160.00
Madera Pino Americano Bruta (4 usos) 28.0000 P2 125.00 105.93 19.07 2,966.10 533.90 3,500.00
Zinc Calibre 34 (3 x 6) 2 usos 32.0000 PLANCHA 355.10 300.93 54.17 9,629.83 1,733.37 11,363.20
Puerta (0.90 x 2.10 mts.) y Marco 1.0000 UD 5,462.96 4,629.63 833.33 4,629.63 833.33 5,462.96
Albañil de Segunda Categoria 3.0000 Día 1,568.75 4,706.25 0.00 4,706.25
Carpintero de Segunda Categoria 3.0000 Día 1,568.75 4,706.25 0.00 4,706.25
Trabajador No calificado (TNC) 3.0000 Día 823.75 2,471.25 0.00 2,471.25
Herramientas (2%) 0.0200 P.A. 79,154.85 67,080.38 12,074.47 1,341.61 241.49 1,583.10
COSTO/UD 32,281.43 3,671.58 35,953.01
COSTO/M2 658.80 74.93 733.73

1.103 Verja Delimitante En Zinc Y Madera H=1.80Mts

Planchas de zinc 2.1978 pl 355.10 300.93 54.17 661.39 119.05 780.44


Madera 2 x 4, 1 x 4 12.0048 P2 125.00 105.93 19.07 1,271.69 228.91 1,500.60
Obrero 0.3300 dia 823.75 271.84 0.00 271.84
Mano de obra albañil de segunda 0.3300 dia 1,568.75 517.69 0.00 517.69
Capataz 0.3300 dia 2,471.25 815.51 0.00 815.51
Herramientas( clavos de zinc, etc) 1.0000 PA 150.00 127.12 22.88 127.12 22.88 150.00
M.O. Confección Hoyos 2.0000 Ml 35.00 70.00 0.00 70.00
M.O. Fijación (Todo Costo) 2.0000 Ml 80.00 160.00 0.00 160.00
Herramientas (2%) 0.0200 P.A. 2,431.04 2,060.20 370.84 41.20 7.42 48.62
COSTO/UD 3,936.44 378.25 4,314.70
COSTO/M2 1,968.22 189.13 2,157.35
1.2 ACTIVIDADES VARIAS

1.201 Traslado De Butacas, Sillas Y Mesas

Traslado De Butacas, Sillas Y Mesas 1.0000 aula 1,350.00 1,350.00 0.00 1,350.00
COSTO/UD 1,350.00 0.00 1,350.00

1.202 Desmonte Y Montura De Pizarras

Desmonte y Montura de pizarras 1.0000 und 1,100.00 1,100.00 0.00 1,100.00


COSTO/UD 1,100.00 0.00 1,100.00

2 MODULO I (1ER NIVEL)

2.1 DESMONTES Y DEMOLICIONES

2.101 Desmonte De Lona Asfaltica, Inc. Bajada De Materiales

Espatula 0.0300 UD 130.00 110.17 19.83 3.31 0.59 3.90


Cuchilla 0.0300 UD 175.00 148.31 26.69 4.45 0.80 5.25
Mano de obra levantamiento impermeabiliz 1.0000 M2 25.00 25.00 0.00 25.00
Bajada de material 0.0600 M3 260.00 15.60 0.00 15.60
COSTO/MT² 48.35 1.40 49.75

2.102 Demolicion De Fino de Techo Plano E=10Cms

Maseta 0.0100 Und 625.00 529.66 95.34 5.30 0.95 6.25


Cinsel 0.0100 Und 225.00 190.68 34.32 1.91 0.34 2.25
Pala 0.0100 Und 775.00 656.78 118.22 6.57 1.18 7.75
Pico 0.0100 Und 1,121.00 950.00 171.00 9.50 1.71 11.21
Martillo 0.0100 Und 240.00 203.39 36.61 2.03 0.37 2.40
Carretilla 3Pie 0.0050 Und 5,500.00 4,661.02 838.98 23.31 4.19 27.50
M.O demolicion fino techo inclinado 1.0000 Mt² 120.00 95.00 0.00 95.00
Traslado material de demolicion de fino tec 0.1500 D/H 95.00 12.00 0.00 12.00
COSTO/MT² 154.73 8.59 163.32
COSTO/MT³ 1,547.29 85.91 1,633.20

2.103 Bote De Material (Inc. Carguio) D=5Km

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73

MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

2.2 TERMINACION DE TECHO

2.201 Fino En Techo Plano (2Do Nivel)

madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0400 m3 6,993.84 5,926.98 1,066.86 237.08 42.67 279.75
fino en techo horiz. sin incl. subida de mater 1.0000 m2 164.22 164.22 0.00 164.22
Herramientas (2%) 0.0200 P.A. 281.38 238.46 42.92 4.77 0.86 5.63
COSTO/MT² 407.44 43.78 451.22

2.202 Imperm. Tela Asfaltica De 4Mm (Granular)

Prime + 10% 0.0500 GL/MT² 1,375.00 1,165.25 209.75 58.26 10.49 68.75
Manto asfartico e= 4mm+10% 1.1000 MT² 501.87 425.31 76.56 467.84 84.21 552.06
Pintura de aluminio 0.0500 GL/MT² 1,100.00 932.20 167.80 46.61 8.39 55.00
Aplicación impermeabilizante 1.0000 MT² 26.71 26.71 0.00 26.71
COSTO/MT² 599.43 103.09 702.52

2.203 Zabaleta En Techo Plano (2Do Nivel)

Mortero 1:3-A 0.0100 m3 6,993.84 5,926.98 1,066.86 59.27 10.67 69.94


Mano de Obra 1.0000 ml 87.58 87.58 0.00 87.58
Mano de Obra Subida materiales - Ayudant 0.1000 DIA 1,058.75 95.00 0.00 95.00
Herramientas (2%) 0.0200 P.A. 69.94 59.27 10.67 1.19 0.21 1.40
COSTO/Ml 243.04 10.88 253.92

2.3 INSTALACION SANITARIA

2.301 S/C Accesorios Inodoro (C/Valvula)

niple niquelado 3/8" x 2½" 1.0000 UD 45.00 38.14 6.86 38.14 6.86 45.00
reducción bushing de ½" A 3/8" HG. 1.0000 UD 29.66 25.14 4.52 25.14 4.52 29.66
arandela sanitaria PVC de 3 ó 4" 1.0000 UD 99.04 83.93 15.11 83.93 15.11 99.04
cubrefalta niquelado de 3/8" 1.0000 UD 18.00 15.25 2.75 15.25 2.75 18.00
junta de CERA 1.0000 UD 99.59 84.40 15.19 84.40 15.19 99.59
llave ANGULAR de 3/8" 1.0000 UD 244.86 207.51 37.35 207.51 37.35 244.86
tubo flexible plástico 1.0000 UD 127.57 108.11 19.46 108.11 19.46 127.57
tornillos para inodoros 2.0000 UD 42.83 36.30 6.53 72.59 13.07 85.66
Tubo de Silicon industrial trasnp. 10.3 0.3000 UD 450.00 381.36 68.64 114.41 20.59 135.00
Teflon 3/4'' 0.5000 UD 22.94 19.44 3.50 9.72 1.75 11.47
montura inodoros de una pieza 1.0000 UD 2,890.36 2,890.36 0.00 2,890.36
COSTO/UD 3,649.55 136.66 3,786.21
2.302 S/C Accesorios Lavamanos (Sifon, Cola, Llave, Mano De Obra)

niple niquelado 3/8" x 2½" 2.0000 UD 45.00 38.14 6.86 76.27 13.73 90.00
reducción bushing de ½" A 3/8" HG. 2.0000 UD 29.66 25.14 4.52 50.27 9.05 59.32
sifón drenaje 1½" 1.0000 UD 192.29 162.96 29.33 162.96 29.33 192.29
boquilla para lavamanos 1.0000 UD 700.00 593.22 106.78 593.22 106.78 700.00
cubrefalta niquelado de 3/8" 2.0000 UD 18.00 15.25 2.75 30.51 5.49 36.00
llave ANGULAR de 3/8" 2.0000 UD 244.86 207.51 37.35 415.02 74.70 489.72
tubo flexible plástico 2.0000 UD 127.57 108.11 19.46 216.22 38.92 255.14
mezcladora 1.0000 UD 1,963.25 1,663.77 299.48 1,663.77 299.48 1,963.25
tarugos plásticoS 3/8" 4.0000 UD 15.00 12.71 2.29 50.85 9.15 60.00
tornillo 3" x 14 4.0000 UD 42.83 36.30 6.53 145.19 26.13 171.32
montura de accesorios de lavamano 1.0000 UD 300.00 300.00 0.00 300.00
COSTO/UD 3,704.27 612.77 4,317.04

2.303 S/C Orinal Sencillo (Inc. Accesorios)

Orinal pequeño con accesorios 1.0000 ud. 4,773.70 4,045.51 728.19 4,045.51 728.19 4,773.70
Válvula para orinales 1.0000 ud. 192.29 162.96 29.33 162.96 29.33 192.29
Sifon de 11/2 pvc. 1.0000 ud. 192.29 162.96 29.33 162.96 29.33 192.29
Llave angular de 3/8'' 1.0000 ud. 244.86 207.51 37.35 207.51 37.35 244.86
Niple 3/8" x 2 1/2", cromado 1.0000 ud. 45.00 38.14 6.86 38.14 6.86 45.00
Cubrefalta 3/8'' cromado 1.0000 ud. 18.00 15.25 2.75 15.25 2.75 18.00
tubo flexible plástico 1.0000 ud. 127.57 108.11 19.46 108.11 19.46 127.57
Teflón 1.0000 rollo 22.94 19.44 3.50 19.44 3.50 22.94
Mano de Obra 1.0000 ud 2,190.00 2,190.00 0.00 2,190.00
COSTO/UD 6,949.87 856.78 7,806.65

2.304 S/C Desague De Piso 2" (Inc. Rejilla)

sifón drenaje 2" 1.0000 UD 192.29 162.96 29.33 162.96 29.33 192.29
rejilla roscada de 2" HG para piso 1.0000 UD 70.00 59.32 10.68 59.32 10.68 70.00
desague de piso de 2 pulgadas (Incl. Parrilla 1.0000 Ud 1,122.30 1,122.30 0.00 1,122.30
COSTO/UD 1,344.58 40.01 1,384.59

2.4 TERMINACION DE PISO

2.401 Brillado Y Cristalizado

Brillado 1.0000 MT² 150.00 127.12 22.88 127.12 22.88 150.00


Cristalizado 1.0000 MT² 80.00 67.80 12.20 67.80 12.20 80.00
COSTO/MT² 194.92 35.08 230.00

2.5 PUERTAS, VENTANAS Y PROTECTORES

2.501 Rep. Ventana Aluminio (Inc. Lijado, Pintura)

250

2.6 PINTURA

2.601 Pintura De Mantenimiento En Muros Y Columnas (2 Manos)

pintura mantenimiento 0.0800 GLS 1,130.00 957.63 172.37 76.61 13.79 90.40
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 175.40 148.64 26.76 2.97 0.54 3.51
COSTO/MT² 220.42 25.77 246.19

2.602 Pintura Acrilica En Muros Y Columnas (2 Manos)

pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38

2.603 Pintura Acrilica En Techo Y Vigas (2 Manos)

pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38

2.604 Pintura Mantenimiento En Puerta Metalica (2 Manos)

Suministro pintura esmalte 0.0400 GLN 1,130.00 957.63 172.37 38.31 6.89 45.20
Thinner 0.0500 GLN 416.67 353.11 63.56 17.66 3.18 20.83
M.O aplicación dos manos a pistola 1.0000 MT² 75.00 75.00 0.00 75.00
Desperdicios y retoques. 0.2000 66.03 55.96 10.07 11.19 2.01 13.21
COSTO/MT² 142.15 12.09 154.24

2.605 Pintura Mantenimiento Protectores Y Pasamano (2 Manos)

Suministro pintura esmalte 0.0400 GLN 1,130.00 957.63 172.37 38.31 6.89 45.20
Thinner 0.0500 GLN 416.67 353.11 63.56 17.66 3.18 20.83
M.O aplicación dos manos a pistola 1.0000 MT² 75.00 75.00 0.00 75.00
Desperdicios y retoques. 0.2000 66.03 55.96 10.07 11.19 2.01 13.21
COSTO/MT² 142.15 12.09 154.24

2.7 INSTALACION ELECTRICA MODULO 1 ( NIVEL 1 y 2 )

2.701 S/C Accesorios Interruptor Doble

Caja rectangular de 1/2" 1.0000 UD 120.43 102.06 18.37 102.06 18.37 120.43
EMT de 1/2" X 10' 1.5000 UD 170.95 144.87 26.08 217.31 39.12 256.43
Curva EMT de 1/2" 2.0000 PL 44.33 37.57 6.76 75.14 13.52 88.66
Coupling EMT de 1/2" 3.0000 UD 9.36 7.93 1.43 23.80 4.28 28.08
Conector recto EMT de 1/2" 2.0000 UD 158.92 134.68 24.24 269.36 48.48 317.84
Alambre THW #12 45.0000 PL 14.12 11.97 2.15 538.47 96.93 635.40
Tape 3M SCOTT +33 0.0500 ROLL 416.67 353.11 63.56 17.66 3.18 20.83
Abrazadera EMT de 1/2" 4.0000 UD 2.98 2.53 0.45 10.10 1.82 11.92
Tarugo azul c/tornillo 8.0000 UD 15.00 12.71 2.29 101.69 18.31 120.00
Mano de obra 1.0000 PA 885.94 885.94 0.00 885.94
COSTO/UD 2,241.52 244.00 2,485.53

2.702 S/C Lampara Tipo Cobra 150W

Caja Octagonal americana 1/2" ó 3/4" 1.0000 UD 120.43 102.06 18.37 102.06 18.37 120.43
Tuberia de 1/2" PVC SDR-26 20.0000 PL 113.89 96.52 17.37 1,930.34 347.46 2,277.80
Alambre THHN # 12 42.0000 PL 14.12 11.97 2.15 502.58 90.46 593.04
Conectores PVC de 1/2" 2.0000 UD 12.00 10.17 1.83 20.34 3.66 24.00
Tuercas conduit de 1/2" 2.0000 UD 1.12 0.95 0.17 1.90 0.34 2.24
Mensajero electrico (soga, nylon) 21.0000 PL 1.38 1.17 0.21 24.56 4.42 28.98
Materiales menores (tornillos, etc) 1.0000 P.A. 15.50 13.14 2.36 13.14 2.36 15.50
Cemento PVC 0.0130 PINTA 205.03 173.75 31.28 2.26 0.41 2.67
Cinta adhesiva 3m (rollo) 0.0500 UD 416.67 353.11 63.56 17.66 3.18 20.83
Mano de obra cenital 1.0000 P.A. 885.94 885.94 0.00 885.94
Suministro de Lampara Tipo Cobra 150W 1.0000 UD 3,500.00 2,966.10 533.90 2,966.10 533.90 3,500.00
M.O. Colocacion lampara Tipo Cobra 150W 1.0000 UD 500.00 500.00 0.00 500.00
COSTO/UD 6,966.86 1,004.57 7,971.43

2.703 S/C Aire Acondicionado De 24BTU ( Psicologia y Biblioteca )

A/A Aire Acondicionado De 24BT 1.0000 Und 52,000.00 44,067.80 7,932.20 44,067.80 7,932.20 52,000.00
mano de obra instalac ion A/A De 24BT 0.2000 Und 52,000.00 10,400.00 0.00 10,400.00
COSTO/UD 54,467.80 7,932.20 62,400.00

2.704 S/C Extractor

Extractor 1.0000 Und 6,800.00 5,762.71 1,037.29 5,762.71 1,037.29 6,800.00


mano de obra instalacion Extractor 0.2000 Und 6,800.00 1,360.00 0.00 1,360.00
COSTO/UD 7,122.71 1,037.29 8,160.00

2.705 Salida Control Para Abanico Techo

accesorios electricos 1.0000 UD 1,250.00 1,059.32 190.68 1,059.32 190.68 1,250.00


Mano obra instalacion Salida Control para 1.0000 UD 300.00 300.00 0.00 300.00
COSTO/UD 1,359.32 190.68 1,550.00

2.706 Salida Cenital Abanico (Techo) 56"

Abanico KDK (Techo) 56" 1.0000 UD 4,600.00 3,898.31 701.69 3,898.31 701.69 4,600.00
accesorios electricos 0.1000 % 4,600.00 3,898.31 701.69 389.83 70.17 460.00
Mano obra instalacion Abanico KDK (Techo) 1.0000 UD 1,200.00 1,200.00 0.00 1,200.00
COSTO/UD 5,488.14 771.86 6,260.00

2.8 INSTALACION ELECTRICA MODULO 11

2.801 Salida Control Para Abanico Techo

accesorios electricos 1.0000 UD 1,250.00 1,059.32 190.68 1,059.32 190.68 1,250.00


Mano obra instalacion Salida Control para 1.0000 UD 300.00 300.00 0.00 300.00
COSTO/UD 1,359.32 190.68 1,550.00

2.802 Salida Cenital Abanico (Techo) 56"

Abanico KDK (Techo) 56" 1.0000 UD 4,600.00 3,898.31 701.69 3,898.31 701.69 4,600.00
accesorios electricos 0.1000 % 4,600.00 3,898.31 701.69 389.83 70.17 460.00
Mano obra instalacion Abanico KDK (Techo) 1.0000 UD 1,200.00 1,200.00 0.00 1,200.00
COSTO/UD 5,488.14 771.86 6,260.00

2.803 S/C Aire Acondicionado De 12BTU ( Psicologia y Biblioteca )

A/A Aire Acondicionado De 12BTU 1.0000 Und 28,500.00 24,152.54 4,347.46 24,152.54 4,347.46 28,500.00
mano de obra instalac ion A/A De 12BTU 0.2000 Und 28,500.00 5,700.00 0.00 5,700.00
COSTO/UD 29,852.54 4,347.46 34,200.00

2.804 S/C Extractor

Extractor 1.0000 Und 6,800.00 5,762.71 1,037.29 5,762.71 1,037.29 6,800.00


mano de obra instalacion Extractor 0.2000 Und 6,800.00 1,360.00 0.00 1,360.00
COSTO/UD 7,122.71 1,037.29 8,160.00

2.9 INSTALACION ELECTRICA COMEDOR

2.901 Salida Control Para Abanico Techo


accesorios electricos 1.0000 UD 1,250.00 1,059.32 190.68 1,059.32 190.68 1,250.00
Mano obra instalacion Salida Control para 1.0000 UD 300.00 300.00 0.00 300.00
COSTO/UD 1,359.32 190.68 1,550.00

2.8 INSTALACION ELECTRICA P/PROTEGER LA PARTE DE BAJA TENSION

2.801 S/C Condulex de 2"

Suministro condulex de 2" 1.0000 PL 606.48 513.97 92.51 513.97 92.51 606.48
Colocacion condulex de 2" 0.3500 PL 606.48 212.27 0.00 212.27
COSTO/PL 726.24 92.51 818.75

2.802 S/C Alambre #6

Suministro Alambre #6 1.0000 PL 45.43 38.50 6.93 38.50 6.93 45.43


Colocacion Alambre #6 0.3500 PL 45.43 15.90 0.00 15.90
COSTO/PL 54.40 6.93 61.33

2.803 S/C Alambre #8

Suministro Alambre #8 1.0000 PL 29.92 25.36 4.56 25.36 4.56 29.92


Colocacion Alambre #8 0.3500 PL 29.92 10.47 0.00 10.47
COSTO/PL 35.83 4.56 40.39

2.804 Registro Electrico 70X70X60Cms Suelo Blando

Exc. En tierra 1.1830 m3 458.30 542.17 0.00 542.17


Relleno reposición manual 0.4140 m3 163.34 67.62 0.00 67.62
Bote de Material 1.1830 m3 1,288.31 1,524.07 0.00 1,524.07
Losa de fondo 0.1690 m3 11,621.53 9,848.76 1,772.78 1,664.44 299.60 1,964.04
Losa superior 0.1690 m3 15,045.61 12,750.52 2,295.09 2,154.84 387.87 2,542.71
Bloques de 6" B.N.P. 2.4000 m2 1,499.07 1,270.40 228.67 3,048.96 548.81 3,597.78
Pañete rateado- m.llana 1.6800 m2 293.91 249.07 44.83 418.44 75.32 493.76
COSTO/MT² 9,420.56 1,311.60 10,732.16

3 MODULO I (2DO NIVEL)

3.1 PISOS

3.101 Limpieza y Derretido En Junta

Limpieza y Derretido En Junta 1.0000 Mt2 45.00 45.00 0.00 45.00


COSTO/UD 45.00 0.00 45.00

3.2 INSTALACION ELECTRICA

3.201 S/C Aire Acondicionado De 24BTU ( Oficina )

A/A Aire Acondicionado De 24BT 1.0000 Und 52,000.00 44,067.80 7,932.20 44,067.80 7,932.20 52,000.00
mano de obra instalac ion A/A De 24BT 0.2000 Und 52,000.00 10,400.00 0.00 10,400.00
COSTO/UD 54,467.80 7,932.20 62,400.00

4 AREA EXTERIOR

4.1 VERJA PERIMETRAL EN BLOQUES

4.101 Pintura De Acrílica En Vigas, Muros Y Columnas

pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38

4.102 Pintura Mantenimiento en Puerta MetCica corrediza (2 manos)

Suministro pintura esmalte 0.0400 GLN 1,130.00 957.63 172.37 38.31 6.89 45.20
Thinner 0.0500 GLN 416.67 353.11 63.56 17.66 3.18 20.83
M.O aplicación dos manos a pistola 1.0000 MT² 75.00 75.00 0.00 75.00
Desperdicios y retoques. 0.2000 141.03 119.52 21.51 23.90 4.30 28.21
COSTO/MT² 154.86 14.38 169.24

4.2 CANALETAS

4.201 Limpieza Canaleta 40X60Cm (C/Parrilla)

Limpieza Canaleta 40X60Cm (C/Parrilla) 1.0000 ML 2,000.00 2,000.00 0.00 2,000.00


COSTO/UD 2,000.00 0.00 2,000.00

4.3 PLAZA CIVICA

4.301 Const. Base Y Pedestal De Bandera

Base de bandera 1.0000 Ud 12,044.10 10,206.86 1,837.24 10,206.86 1,837.24 12,044.10


Pintura oxido rojo, aluminio etc 2.0000 P.A 900.00 762.71 137.29 1,525.42 274.58 1,800.00
Tubos galv 2-1/2-20 1.0000 Ud 75.00 63.56 11.44 63.56 11.44 75.00
Tubos galv 1 -1/2-20 1.0000 Ud 179.30 151.95 27.35 151.95 27.35 179.30
Reduccion de 2-1/2 a 1-1/2 1.0000 Ud 930.00 788.14 141.86 788.14 141.86 930.00
Copa final 1.0000 Ud 22.00 18.64 3.36 18.64 3.36 22.00
Polea peq sencilla 1-1/2" 1.0000 Ud 6.00 5.08 0.92 5.08 0.92 6.00
Drisa blanca de 1/8 1.0000 Ud 8.00 6.78 1.22 6.78 1.22 8.00
Pieza metalica para amarre 0.1500 P.A 15,064.40 12,766.44 2,297.96 1,914.97 344.69 2,259.66
COSTO/UND 14,681.40 2,642.65 17,324.06

4.302 S/C Base Y Tarja Acrilica

Base 1.0000 Ud 12,044.10 10,206.86 1,837.24 10,206.86 1,837.24 12,044.10


Tarja Acrilica 1.0000 Ud 18,308.02 15,515.27 2,792.75 15,515.27 2,792.75 18,308.02
COSTO/UND 25,722.14 4,629.98 30,352.12

4.303 Piso De H.A. C/Malla Elect. 10X10Cms 2.3Mts

Malla electrosoldada 2.7 x 2.7 10 x 10 0.1100 QQ 15,500.00 13,135.59 2,364.41 1,444.92 260.08 1,705.00
Hormigon 180 kg/m2 industial 1.0500 M3 6,852.58 5,807.27 1,045.31 6,097.64 1,097.57 7,195.21
Madera a todo costo (GUARDERAS) 4.0000 ML 225.00 190.68 34.32 762.71 137.29 900.00
Mano obra malla 0.1100 M2 48.14 5.30 0.00 5.30
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 8,564.80 1,494.95 10,059.75
COSTO/MT² 77,861.83 13,590.43 91,452.26

4.304 S/C Banco De Granito - Sin Espaldar

Excavacion 0.0360 MT³ 458.30 16.50 0.00 16.50


Bote de material 0.1870 MT³ 1,288.31 240.91 0.00 240.91
Hormigon en zapata 0.0720 MT³ 6,057.61 5,133.57 924.04 369.62 66.53 436.15
Block 6 0.7200 MT² 1,499.07 1,270.40 228.67 914.69 164.64 1,079.33
Pañete en muro de bloques 1.1000 MT² 382.85 324.45 58.40 356.89 64.24 421.13
Cantos en muros de bloques 4.0000 ML 142.34 120.63 21.71 482.51 86.85 569.36
Mocheta 0.3000 MT² 198.11 167.89 30.22 50.37 9.07 59.43
Suministro Banco 1.0000 Ud 7,900.78 6,695.58 1,205.20 6,695.58 1,205.20 7,900.78
COSTO/UD 9,127.07 1,596.54 10,723.61

4.4 MISCELANEOS

4.401 S/C Letras En Bronce De 8"

Letras en Bronce de 8" 1.0000 UD 1,946.27 1,649.38 296.89 1,649.38 296.89 1,946.27
Colocacion de letras en Sintra de 8" 0.4000 % 1,946.27 778.51 0.00 778.51
COSTO/UD 2,427.89 296.89 2,724.78

4.402 S/C Figura De Bronce En Baños

Figura de bronce en baño 1.0000 UD 1,073.42 909.68 163.74 909.68 163.74 1,073.42
Figura de bronce en baño 0.4000 % 1,073.42 429.37 0.00 429.37
COSTO/UD 1,339.04 163.74 1,502.78

4.5 ACTIVIDAD FINAL

4.501 Limpieza Final (Recog. Acopio Y Barrido)

Ayudante 2.0000 UND 1,058.75 2,117.50 0.00 2,117.50


obrero 3.0000 UND 823.75 2,471.25 0.00 2,471.25
capataz 1.0000 UND 2,471.25 2,471.25 0.00 2,471.25
Herramientas 0.1000 % 7,060.00 5,983.05 1,076.95 598.31 107.69 706.00
COSTO P/A 7,658.31 107.69 7,766.00

A.1 CONST. BLOQUE DE BAÑO DE 4 INODOROS

I.1 PRELIMINARES

1.2 LIMPIEZA Y REPLANTEO

1.201 Replanteo

Cal (50 LBS) 5.0000 FDA 260.00 220.34 39.66 1,101.69 198.31 1,300.00
Clavos Corrientes 20.0000 LBS 60.00 50.85 9.15 1,016.95 183.05 1,200.00
Madera Pino Americano Bruta (3 usos) 66.6667 P2 125.00 105.93 19.07 7,062.15 1,271.19 8,333.33
Clavos Acero 5.0000 LBS 55.10 46.69 8.41 233.47 42.03 275.50
Hilo de nylon 5.0000 LBS 168.30 142.63 25.67 713.14 128.36 841.50
Herramienta de Trabajo a mano 1.0000 PA 1,500.00 1,271.19 228.81 1,271.19 228.81 1,500.00
Maestro de Carpinteria 3.0000 Día 2,471.25 7,413.75 0.00 7,413.75
Maestro de Albañileria 3.0000 Día 2,471.25 7,413.75 0.00 7,413.75
Brigada Reducida Topografia 10.0000 Día 3,500.00 35,000.00 0.00 35,000.00
Estacion total 1.0000 Día 10,000.00 10,000.00 0.00 10,000.00
Carpintero de Segunda Categoria 3.0000 Día 1,568.75 4,706.25 0.00 4,706.25
Trabajador No calificado (TNC) 3.0000 Día 823.75 2,471.25 0.00 2,471.25
COSTO/UD 78,403.59 2,051.75 80,455.33
COSTO/m2 273.16 7.15 4,469.74

1.3 MOVIMIENTO DE TIERRA

1.301 Extracción de capa vegetal

EXTRACCION CON D7G 1.0000 COSTO/M3N = 44.15 37.42 6.74 37.42 6.74 44.15
REND =95.00 M3/H

CARGIO 950 CAT 1.0000 COSTO/M3E = 33.81 28.65 5.16 28.65 5.16 33.81
REND = 95.00 M3/H

ARRANQUE 1.0000 COSTO/M3N = 20.30 17.21 3.10 17.21 3.10 20.30

COSTO/MT³ 83.27 14.99 98.26

1.302 Excavacionesen suelo I ( a mano )

EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos

MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32

Sub-Total (3) Mano de Obra 449.32 0.00 449.32


COSTO/MT³ 456.93 1.37 458.30

1.303 Relleno de reposición traslado,regado y comp.

PALA "TRAMONTINA" 0.0100 UD 775.00 656.78 118.22 6.57 1.18 7.75


PICO "TRAMONTINA" 0.0100 UD 1,121.00 950.00 171.00 9.50 1.71 11.21
Regado, nivelado y apisonado de relleno 1.2000 m3 120.00 144.00 0.00 144.00
Herramientas (2%) 0.0200 P.A. 18.96 16.07 2.89 0.32 0.06 0.38
COSTO/MT³ 160.39 2.95 163.34

1.304 Relleno compactado 20cm ( cliche) c/maquito

Alq. Compactador maquito 1.00 M3 10.42 8.83 1.59 8.83 1.59 10.42
Peones ( 3 ) 3.0000 Hr 102.97 308.91 0.00 308.91
Combustible (3 Galones/día) 0.3800 Gls 221.60 187.80 33.80 71.36 12.85 84.21
Lubricante 0.1500 Gls 84.21 71.36 12.85 10.70 1.93 12.63
SUB-TOTAL 416.16
Rendimiento 3.0000 Mt³/Hr 416.16 138.72 138.72
Material granular 1.5000 Mt³ 650.00 975.00 0.00 975.00
Regado y mojado 1.0000 Mt³ 175.00 175.00 175.00
Herramienta 0.0200 % 1,113.72 943.83 169.89 18.88 3.40 22.27
COSTO/MT³ 1,307.60 3.40 1,311.00

1.305 Bote de material sobrante e=1.25)

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73

MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

1.4 HORMIGON ARMADO EN (HORM. IND.):

1.401 Zapata muros 6" (0.45 x 0.25) 3Ø3/8"

Acero 3/4'' 0.7700 QQ 3,800.00 3,220.34 579.66 2,479.66 446.34 2,926.00


Acero 1/2'' 0.0000 QQ 3,800.00 3,220.34 579.66 0.00 0.00 0.00
Alambre #18 1.5400 lbs 100.00 84.74 15.25 130.50 23.49 153.99
Hormigon 210 kg/m2 (Inc. bombeo) 1.0500 M3 7,205.15 6,106.06 1,099.09 6,411.36 1,154.04 7,565.40
Mano obra acero zapata de muros 8.8900 ml 133.76 1,189.13 0.00 1,189.13
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 10,464.89 1,623.87 12,088.76

1.402 Zapata de columnas (1.20*1.20*.35)mt Ø1/2"@0.10

Acero 1/2'' 1.39200 QQ 3,800.00 3,220.34 579.66 4,482.71 806.89 5,289.60


Alambre #18 2.78400 lbs 100.00 84.74 15.25 235.92 42.47 278.39
Hormigon 210 kg/m2 industrial 1.05000 M3 7,205.15 6,106.06 1,099.09 6,411.36 1,154.04 7,565.40
Mano obra acero zapata 1.39200 QQ 133.76 186.19 0.00 186.19
Personal por la casa 1.05000 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 11,570.43 2,003.40 13,573.83

1.403 Columnas (0.15*0.30)4Ø1/2¨est.Ø3/8¨@20

Acero Ø1/2´´ de 20! 2.7810 QQ 3,800.00 3,220.34 579.66 8,955.76 1,612.04 10,567.80
Acero Ø 3/8 ´´ de 20! 1.5680 QQ 3,800.00 3,220.34 579.66 5,049.49 908.91 5,958.40
Alambre No.18 8.6980 LBS 100.00 84.74 15.25 737.09 132.68 869.76
Hormigón Industrial 210 kg /cm2 +5% 1.0200 MT³ 7,205.15 6,106.06 1,099.09 6,228.18 1,121.07 7,349.25
M.O acero 4.3490 QQ 401.30 1,745.25 0.00 1,745.25
Encofrado 25.0000 ML 600.00 15,000.00 0.00 15,000.00
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 37,970.01 3,774.69 41,744.71

1.404 Viga bnp (15*20)4 Ø3/8¨est.Ø3/8¨@20

Acero Ø 3/8´´ de 20! 2.1430 QQ 3,800.00 3,220.34 579.66 6,901.19 1,242.21 8,143.40
Alambre No.18 4.2860 LBS 100.00 84.74 15.25 363.20 65.38 428.58
Hormigón Industrial 210 kg /cm2 +5% 1.0200 MT³ 7,205.15 6,106.06 1,099.09 6,228.18 1,121.07 7,349.25
M.O acero 2.1430 QQ 401.30 859.99 0.00 859.99
Personal por la casa 1.0500 242.13 254.24 0.00 254.24
COSTO/MT³ 14,606.79 2,428.66 17,035.46

1.405 Vigas amarre (0.15*0.20)4Ø3/8" est Ø3/8" @20

Acero Ø 3/8´´ de 20! 2.1430 QQ 3,800.00 3,220.34 579.66 6,901.19 1,242.21 8,143.40
Alambre No.18 4.2860 LBS 100.00 84.74 15.25 363.20 65.38 428.58
Hormigón Industrial 210 kg /cm2 +5% 1.0200 MT³ 7,205.15 6,106.06 1,099.09 6,228.18 1,121.07 7,349.25
M.O acero 2.1430 QQ 401.30 859.99 0.00 859.99
Encofrado 33.3330 ML 250.00 8,333.25 0.00 8,333.25
Personal por la casa 1.0500 242.13 254.24 0.00 254.24
COSTO/MT³ 22,940.04 2,428.66 25,368.71

1.406 Dintel (15*20) 4Ø3/8¨est.Ø3/8¨@20

Acero Ø 3/8´´ de 20! 1.2034 QQ 3,800.00 3,220.34 579.66 3,875.38 697.57 4,572.95
Alambre No.18 2.4068 LBS 100.00 84.74 15.25 203.96 36.71 240.67
Hormigón Industrial 210 kg /cm2 +5% 1.0200 MT³ 7,205.15 6,106.06 1,099.09 6,228.18 1,121.07 7,349.25
M.O acero 1.2034 QQ 401.30 482.93 0.00 482.93
Encofrado 33.3330 ML 250.00 8,333.25 0.00 8,333.25
Personal por la casa 1.0500 242.13 254.24 0.00 254.24
COSTO/MT³ 19,377.94 1,855.35 21,233.29

1.407 Losas y vuelos (h=0.13) Ø3/8"@0.25

Acero Ø3/8" 2.5000 QQ 3,800.00 3,220.34 579.66 8,050.85 1,449.15 9,500.00


Alambre #18 5.0000 M3 100.00 84.74 15.25 423.71 76.27 499.98
Hormigon Industrial 210 kg/m2 1.0500 LB 7,205.15 6,106.06 1,099.09 6,411.36 1,154.04 7,565.40
Madera a todo costo 7.6923 M2 260.00 2,000.00 0.00 2,000.00
Mano obra acero 10.0000 QQ 401.30 4,013.00 0.00 4,013.00
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 21,153.16 2,679.47 23,832.62

1.5 MUROS DE BLOQUES

1.501 De 6¨ acero vert. 60cm BNP

bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 3/8" x 20' -G40 0.0320 QQ 3,800.00 3,220.34 579.66 103.05 18.55 121.60
alambre dulce #18 0.0640 Lbs 100.00 84.74 15.25 5.42 0.98 6.40
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 KG/cms2 (1:3:5) 0.0240 m3 6,116.15 5,183.18 932.97 124.40 22.39 146.79
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 20.52 0.00 20.52
Herramientas (2%) 0.0200 P.A. 694.50 588.56 105.94 11.77 2.12 13.89
COSTO/M2 1,263.86 161.39 1,425.25

1.502 De 6¨ acero vert. 60cm SNP

Bloques horm. + 4% desp. + itbis 13.0000 u 44.00 37.29 6.71 484.75 87.25 572.00
Mortero 1:3 en juntas + 30% desp. 0.0312 m3 6,993.84 5,926.98 1,066.86 184.92 33.29 218.21
Horm. en cámaras + 10% desp. 0.0200 m3 6,116.15 5,183.18 932.97 103.66 18.66 122.32
Acero 3/8" x 20' grado 40 + 20% desp. 0.0592 qq 3,800.00 3,220.34 579.66 190.64 34.32 224.96
Alambre No. 18 0.0888 LBS 100.00 84.74 15.25 7.53 1.35 8.88
Corte y amarre varilla. 13.0000 u 1.58 20.52 0.00 20.52
Llenado huecos. 13.0000 u 3.15 40.90 0.00 40.90
Coloc. bloques. 13.0000 u 23.53 305.83 0.00 305.83
Andamio 1.0000 M2 63.09 63.09 0.00 63.09
COSTO/MT² 1,401.84 174.87 1,576.71

1.6 TERMINACION DE SUPERFICIES

1.601 Cerámica pared blanco (0.20 x0.20)

derretido cemento blanco (100 LBS) 0.0333 FDS 795.03 673.76 121.28 22.44 4.04 26.47
cerámica 20 x 20 Area de lavado 1.1000 M2 738.83 626.12 112.70 688.74 123.97 812.71
ESTOPA 0.0500 LBS 125.00 105.93 19.07 5.30 0.95 6.25
Pegamento Especial para Ceramica 0.1667 fda 522.00 442.37 79.63 73.73 13.27 87.00
colocación en paredes de losetas cerámica 1.0000 M2 575.71 575.71 0.00 575.71
corte de losetas de cerámica 4.5000 UD 5.00 22.50 0.00 22.50
Herramientas (2%) 0.0300 P.A. 932.43 790.20 142.24 23.71 4.27 27.97
COSTO/MT² 1,412.11 146.50 1,558.62

1.602 Pañete en muros ( a plomo ) 1 er nivel

madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. 1.0000 M2 187.07 187.07 0.00 187.07
nivel
andamios 1.0000 M2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/MT² 352.98 29.86 382.85

1.603 Pañete en techos, vigas

madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 242.13 242.13 0.00 242.13
andamios 1.0000 M2 34.68 29.39 5.29 29.39 5.29 34.68
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/MT² 417.56 31.58 449.14

1.604 Pañete en columnas

Mortero 1:4 de empañete. 0.0150 M3 5,912.96 5,010.98 901.98 75.16 13.53 88.69
Regla madera americana cepillada 1"x4" / 2 0.0250 P2 111.11 94.16 16.95 2.35 0.42 2.78
Andamios en madera 1.0000 M2 34.68 29.39 5.29 29.39 5.29 34.68
Mano de obra empañete techos y vigas 1.0000 M2 242.13 242.13 0.00 242.13
COSTO/MT² 349.03 19.24 368.27

1.605 Careteo en losas, vigas y columnas

Escoba 0.0100 U 15.00 12.71 2.29 0.13 0.02 0.15


mezcla 1:6 0.0080 m3 4,712.52 3,993.66 718.86 31.95 5.75 37.70
fraguache con escoba 1.0000 m2 28.41 28.41 0.00 28.41
Andamios 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 37.85 32.08 5.77 0.64 0.12 0.76
COSTO/MT² 80.98 9.46 90.45

1.606 Goteros de ranura

mezcla 1:1.5:5 (pañete) 0.0003 m3 7,513.44 6,367.32 1,146.12 1.91 0.34 2.25
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
goteros en ranuras 1.0000 ml 164.67 139.55 25.12 139.55 25.12 164.67
Herramientas (2%) 0.0200 P.A. 2.25 1.91 0.34 0.04 0.01 0.05
COSTO/ML 161.36 29.04 190.40

1.608 Cantos en vigas, losa y columnas


madera pino americano cepillada 0.2590 P2 111.11 94.16 16.95 24.39 4.39 28.78
mezcla 1:1.5:5 (pañete) 0.0040 m3 7,513.44 6,367.32 1,146.12 25.47 4.58 30.05
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 58.83 49.86 8.97 1.00 0.18 1.18
COSTO/ML 133.19 9.15 142.34

1.7 TERMINACION DE TECHOS

1.701 Fino de techo inclinado ( 1 er nivel )

madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0350 m3 6,993.84 5,926.98 1,066.86 207.44 37.34 244.78
fino en techo horiz. sin incl. subida de mater 1.0000 m2 131.38 131.38 0.00 131.38
Herramientas (2%) 0.0200 P.A. 246.41 208.82 37.59 4.18 0.75 4.93
COSTO/MT2 344.37 38.34 382.71

1.702 Impermeabiliz. Lona asfaltica (e=4mm) granular

Prime + 10% 0.0500 GL/MT² 1,375.00 1,165.25 209.75 58.26 10.49 68.75
Manto asfartico e= 4mm+10% 1.1000 MT² 501.87 425.31 76.56 467.84 84.21 552.06
Pintura de aluminio 0.0500 GL/MT² 1,100.00 932.20 167.80 46.61 8.39 55.00
Aplicación impermeabilizante 1.0000 MT² 70.91 70.91 0.00 70.91
COSTO/MT² 643.63 103.09 746.72

1.8 INSTALACION SANITARIA

1.801 Inodoros (inc. accs,m.o)

niple niquelado 3/8" x 2½" 1.0000 UD 45.00 38.14 6.86 38.14 6.86 45.00
reducción bushing de ½" A 3/8" HG. 1.0000 UD 29.66 25.14 4.52 25.14 4.52 29.66
arandela sanitaria PVC de 3 ó 4" 1.0000 UD 99.04 83.93 15.11 83.93 15.11 99.04
cubrefalta niquelado de 3/8" 1.0000 UD 18.00 15.25 2.75 15.25 2.75 18.00
junta de CERA 1.0000 UD 99.59 84.40 15.19 84.40 15.19 99.59
llave ANGULAR de 3/8" 1.0000 UD 244.86 207.51 37.35 207.51 37.35 244.86
tubo flexible plástico 1.0000 UD 127.57 108.11 19.46 108.11 19.46 127.57
tornillos para inodoros 2.0000 UD 42.83 36.30 6.53 72.59 13.07 85.66
Tubo de Silicon industrial trasnp. 10.3 0.3000 UD 450.00 381.36 68.64 114.41 20.59 135.00
Teflon 3/4'' 0.5000 UD 22.94 19.44 3.50 9.72 1.75 11.47
montura inodoros de una pieza 1.0000 UD 2,890.36 2,890.36 0.00 2,890.36
COSTO/UD 3,649.55 136.66 3,786.21

1.802 Meseta de granito con palometas metalicas

Meseta de granito con palometa incluida 1.0000 p² 525.00 444.92 80.08 444.92 80.08 525.00
Derretido Cemento Gris (100 LBS) 0.0250 FDS 480.00 406.78 73.22 10.17 1.83 12.00
Mezcla 1:4 0.0320 Mt³ 5,912.96 5,010.98 901.98 160.35 28.86 189.21
Colocacion de meseta 0.3000 % 537.00 161.10 0.00 161.10
COSTO/P² 776.54 110.78 887.31

1.803 Lavamanos ovalado ( meseta ) inc. accesorios

niple niquelado 3/8" x 2½" 2.0000 UD 45.00 38.14 6.86 76.27 13.73 90.00
reducción bushing de ½" A 3/8" HG. 2.0000 UD 29.66 25.14 4.52 50.27 9.05 59.32
sifón drenaje 1½" 1.0000 UD 192.29 162.96 29.33 162.96 29.33 192.29
boquilla para lavamanos 1.0000 UD 700.00 593.22 106.78 593.22 106.78 700.00
cubrefalta niquelado de 3/8" 2.0000 UD 18.00 15.25 2.75 30.51 5.49 36.00
llave ANGULAR de 3/8" 2.0000 UD 244.86 207.51 37.35 415.02 74.70 489.72
tubo flexible plástico 2.0000 UD 127.57 108.11 19.46 216.22 38.92 255.14
mezcladora 1.0000 UD 1,963.25 1,663.77 299.48 1,663.77 299.48 1,963.25
tarugos plásticoS 3/8" 4.0000 UD 15.00 12.71 2.29 50.85 9.15 60.00
tornillo 3" x 14 4.0000 UD 42.83 36.30 6.53 145.19 26.13 171.32
Lavamanos ovalado 1.0000 UD 2,203.42 1,867.31 336.11 1,867.31 336.11 2,203.42
Instalación lavamanos empotrados en mese 1.0000 UD 2,247.21 2,247.21 0.00 2,247.21
COSTO/UD 7,518.79 948.88 8,467.67

1.804 Orinales sencillos

Orinal pequeño con accesorios 1.0000 ud. 4,773.70 4,045.51 728.19 4,045.51 728.19 4,773.70
Válvula para orinales 1.0000 ud. 192.29 162.96 29.33 162.96 29.33 192.29
Sifon de 11/2 pvc. 1.0000 ud. 192.29 162.96 29.33 162.96 29.33 192.29
Llave angular de 3/8'' 1.0000 ud. 244.86 207.51 37.35 207.51 37.35 244.86
Niple 3/8" x 2 1/2", cromado 1.0000 ud. 45.00 38.14 6.86 38.14 6.86 45.00
Cubrefalta 3/8'' cromado 1.0000 ud. 18.00 15.25 2.75 15.25 2.75 18.00
tubo flexible plástico 1.0000 ud. 127.57 108.11 19.46 108.11 19.46 127.57
Teflón 1.0000 rollo 22.94 19.44 3.50 19.44 3.50 22.94
Mano de Obra 1.0000 ud 2,190.00 2,190.00 0.00 2,190.00
COSTO/UD 6,949.87 856.78 7,806.65

1.805 Salida drenaje p/inodoros Ø4" PVC

Tubo 4"x19 PVC SDR-41 1.0000 UND 1,565.38 1,326.59 238.79 1,326.59 238.79 1,565.38
Codo PVC drenaje 4" x 90° 1.0000 UND 129.29 109.57 19.72 109.57 19.72 129.29
Tee PVC drenaje 4" 1.0000 UND 253.97 215.23 38.74 215.23 38.74 253.97
Cemento PVC 0.0100 UND 1,799.00 1,524.58 274.42 15.25 2.74 17.99
Tarugo azul con tornillo 6.0000 UND 15.00 12.71 2.29 76.27 13.73 90.00
Abrazadera 3" EMT 3.0000 UND 52.20 44.24 7.96 132.71 23.89 156.60
Mano de Obra 1.00 UND 1,445.20 1,445.20 0.00 1,445.20
COSTO/UD 3,320.82 337.61 3,658.43

1.806 Salida drenaje p/ilavamanosØ" PVC

Tubo 3"x19 PVC 3.5000 UND 630.77 534.55 96.22 1,870.93 336.77 2,207.70
Cemento PVC OATEY 32oz 0.0180 UND 1,799.00 1,524.58 274.42 27.44 4.94 32.38
Herramientas 0.0500 % 2,240.08 1,898.37 341.71 94.92 17.09 112.00
Excavación en tiera a mano 7.0000 M3 458.30 388.39 69.91 2,718.76 489.38 3,208.13
Relleno de reposición 2.3647 M3 163.34 138.42 24.92 327.33 58.92 386.24
Bote de material producto de excavación 5.0353 M3 1,288.31 1,091.79 196.52 5,497.52 989.55 6,487.07
Mano de Obra 20.0000 ML 33.86 677.20 0.00 677.20
COSTO/UD 11,214.09 1,896.64 13,110.73
COSTO/ML 560.70 94.83 655.54

1.807 Salida drenaje p/inodoros Ø2" PVC

Tubo 2"x19 PVC 3.5000 UND 400.71 339.58 61.13 1,188.54 213.94 1,402.48
Cemento PVC OATEY 32oz 0.0180 UND 1,799.00 1,524.58 274.42 27.44 4.94 32.38
Herramientas 0.0500 % 1,434.86 1,215.99 218.88 60.80 10.94 71.74
Excavación en tiera a mano 7.0000 M3 458.30 388.39 69.91 2,718.76 489.38 3,208.13
Relleno de reposición 2.3647 M3 163.34 138.42 24.92 327.33 58.92 386.24
Bote de material producto de excavación 5.0353 M3 1,288.31 1,091.79 196.52 5,497.52 989.55 6,487.07
Mano de Obra 20.0000 ML 23.76 475.20 0.00 475.20
COSTO/UD 10,295.59 1,767.67 12,063.26
COSTO/ML 514.78 88.38 603.16

1.808 Salida agua fria de 1/2" PVC (P/inodoros

Tubo 1/2"x19 PVC 3.5000 UND 525.00 444.92 80.08 1,557.20 280.30 1,837.50
Cemento PVC OATEY 32oz 0.0180 UND 1,799.00 1,524.58 274.42 27.44 4.94 32.38
Herramientas 0.0500 % 1,869.88 1,584.65 285.24 79.23 14.26 93.49
Excavación en tiera a mano 7.0000 M3 458.30 388.39 69.91 2,718.76 489.38 3,208.13
Relleno de reposición 2.3647 M3 163.34 138.42 24.92 327.33 58.92 386.24
Bote de material producto de excavación 5.0353 M3 1,288.31 1,091.79 196.52 5,497.52 989.55 6,487.07
Mano de Obra 20.0000 ML 9.50 190.00 0.00 190.00
COSTO/UD 10,397.48 1,837.35 12,234.82
COSTO/ML 519.87 91.87 611.74

1.809 Salida agua fria de 1/2" PVC (P/lavamanos )

Tubo 1/2"x19 PVC 3.5000 UND 525.00 444.92 80.08 1,557.20 280.30 1,837.50
Cemento PVC OATEY 32oz 0.0180 UND 1,799.00 1,524.58 274.42 27.44 4.94 32.38
Herramientas 0.0500 % 1,869.88 1,584.65 285.24 79.23 14.26 93.49
Excavación en tiera a mano 7.0000 M3 458.30 388.39 69.91 2,718.76 489.38 3,208.13
Relleno de reposición 2.3647 M3 163.34 138.42 24.92 327.33 58.92 386.24
Bote de material producto de excavación 5.0353 M3 1,288.31 1,091.79 196.52 5,497.52 989.55 6,487.07
Mano de Obra 20.0000 ML 9.50 190.00 0.00 190.00
COSTO/UD 10,397.48 1,837.35 12,234.82
COSTO/ML 519.87 91.87 611.74

1.81 Salida agua fria de 1/2" PVC (P/orinales )

Tubo 1/2"x19 PVC 3.5000 UND 525.00 444.92 80.08 1,557.20 280.30 1,837.50
Cemento PVC OATEY 32oz 0.0180 UND 1,799.00 1,524.58 274.42 27.44 4.94 32.38
Herramientas 0.0500 % 1,869.88 1,584.65 285.24 79.23 14.26 93.49
Excavación en tiera a mano 7.0000 M3 458.30 388.39 69.91 2,718.76 489.38 3,208.13
Relleno de reposición 2.3647 M3 163.34 138.42 24.92 327.33 58.92 386.24
Bote de material producto de excavación 5.0353 M3 1,288.31 1,091.79 196.52 5,497.52 989.55 6,487.07
Mano de Obra 20.0000 ML 9.50 190.00 0.00 190.00
COSTO/UD 10,397.48 1,837.35 12,234.82
COSTO/ML 519.87 91.87 611.74

1.811 Tuberias de 1" PVC ( presion ) todo incluido

Tubo 1"x19 PVC 3.5000 UND 628.96 533.02 95.94 1,865.56 335.80 2,201.36
Cemento PVC OATEY 32oz 0.0180 UND 1,799.00 1,524.58 274.42 27.44 4.94 32.38
Herramientas 0.0500 % 2,233.74 1,893.00 340.74 94.65 17.04 111.69
Excavación en tiera a mano 7.0000 M3 458.30 388.39 69.91 2,718.76 489.38 3,208.13
Relleno de reposición 2.3647 M3 163.34 138.42 24.92 327.33 58.92 386.24
Bote de material producto de excavación 5.0353 M3 1,288.31 1,091.79 196.52 5,497.52 989.55 6,487.07
Mano de Obra 20.0000 ML 19.01 380.20 0.00 380.20
COSTO/UD 10,911.45 1,895.63 12,807.08
COSTO/ML 545.57 94.78 640.35

1.812 Tuberias de 4" PVC ( drenaje s/blsndo ( s/c ) )

Tubo 4"x19 PVC 3.5000 UND 1,565.38 1,326.59 238.79 4,643.08 835.75 5,478.83
Cemento PVC OATEY 32oz 0.0180 UND 1,799.00 1,524.58 274.42 27.44 4.94 32.38
Herramientas 0.0500 % 5,511.21 4,670.52 840.69 233.53 42.03 275.56
Excavación en tiera a mano 7.0000 M3 458.30 388.39 69.91 2,718.76 489.38 3,208.13
Relleno de reposición 2.3647 M3 163.34 138.42 24.92 327.33 58.92 386.24
Bote de material producto de excavación 5.0353 M3 1,288.31 1,091.79 196.52 5,497.52 989.55 6,487.07
Mano de Obra 20.0000 ML 1,445.20 28,904.00 0.00 28,904.00
COSTO/UD 42,351.64 2,420.58 44,772.22
COSTO/ML 2,117.58 121.03 2,238.61

1.813 Registro sanitario ( 1.00*1.00*0.60)mt suelo blando

Exc. En tierra 1.1830 m3 458.30 542.17 0.00 542.17


Relleno reposición manual 0.4830 m3 163.34 78.89 0.00 78.89
Bote de Material 1.1830 m3 1,288.31 1,524.07 0.00 1,524.07
Losa de fondo 0.1690 m3 11,621.53 9,848.76 1,772.78 1,664.44 299.60 1,964.04
Losa superior 0.1690 m3 15,045.61 12,750.52 2,295.09 2,154.84 387.87 2,542.71
Bloques de 6" B.N.P. 2.7600 m2 1,499.07 1,270.40 228.67 3,506.31 631.14 4,137.44
Pañete rateado- m.llana 1.6000 m2 293.91 249.07 44.83 398.52 71.73 470.25
COSTO/MT² 9,869.24 1,390.34 11,259.58

1.814 Ventilación de 3" ( para baños o cocina )

tubo 3" PVC SDR-41 0.5000 UD 630.77 534.55 96.22 267.28 48.11 315.39
codo PVC drenaje 3" x 90° 1.0000 UD 45.24 38.34 6.90 38.34 6.90 45.24
cemento PVC 0.0036 GLS 1,799.00 1,524.58 274.42 5.49 0.99 6.48
instalación Ventilación de 3" 1.0000 Ud 809.27 809.27 0.00 809.27
COSTO/UD 1,120.37 56.00 1,176.37
1.815 Desague de piso 2" ( incluye rejilla )

sifón drenaje 2" 1.0000 UD 192.29 162.96 29.33 162.96 29.33 192.29
rejilla roscada de 2" HG para piso 1.0000 UD 70.00 59.32 10.68 59.32 10.68 70.00
desague de piso de 2 pulgadas (Incl. Parrilla 1.0000 Ud 809.27 809.27 0.00 809.27
COSTO/UD 1,031.55 40.01 1,071.56

1.816 Tinaco antialgas de 500 gls

Tinaco 500.00gls 1.0000 ud 10,858.85 9,202.41 1,656.43 9,202.41 1,656.43 10,858.85


Tuberías y Piezas P.V.C. Presión 1.0000 P.A. 531.00 450.00 81.00 450.00 81.00 531.00
M.O. 1.0000 P.A. 5,455.25 5,455.25 0.00 5,455.25
COSTO/UD 15,107.66 1,737.43 16,845.10

1.817 Vertedero p/baños (revestido de ceramica)

Mezcla 1:3 0.1080 m3 6,993.84 5,926.98 1,066.86 640.11 115.22 755.33


Bloques de 0.10 m 0.2400 m2 1,082.76 917.59 165.17 220.22 39.64 259.86
Ceramica 1.4400 m2 1,558.62 1,320.86 237.76 1,902.04 342.37 2,244.41
Confección pileta de cerámica 1.0000 ud 2,000.00 2,000.00 0.00 2,000.00
Llave de chorro 1.0000 ud 2,359.27 1,999.38 359.89 1,999.38 359.89 2,359.27
Desague de 2" 1.0000 ud 967.01 819.50 147.51 819.50 147.51 967.01
Tuberia y Piezas 1.0000 PA 500.00 423.73 76.27 423.73 76.27 500.00
COSTO/UD 8,004.99 1,080.90 9,085.89

1.818 Filtrante y/o tubular de 8 @6" en PVC percus

Perforación a percución e instalación de tub 1.0000 pl 1,200.00 1,016.95 183.05 1,016.95 183.05 1,200.00
Tubo Ø8" SDR-26 1.0000 pl 904.51 766.53 137.98 766.53 137.98 904.51
Limpieza de lodos 1.0000 p.a. 75.00 75.00 0.00 75.00
Transporte 1.0000 p.a. 321.03 321.03 0.00 321.03
COSTO/PL 2,179.51 321.03 2,500.54

1.9 PARTIDA ELECTRICA

1.901 Salida de luz cenital lamparas led 2*2 superficie

CAJA OCTAGONAL DE 1/2" 1.0000 UD 120.43 102.06 18.37 102.06 18.37 120.43
EMT DE 1/2" X 10' 1.5000 UD 170.95 144.87 26.08 217.31 39.12 256.43
CURVA EMT DE 1/2" 2.0000 PL 44.33 37.57 6.76 75.14 13.52 88.66
COUPLING EMT DE 1/2" 3.0000 UD 9.36 7.93 1.43 23.80 4.28 28.08
CONECTOR RECTO EMT DE 1/2" 2.0000 UD 13.84 11.73 2.11 23.46 4.22 27.68
ALAMBRE THW #12 45.0000 PL 14.12 11.97 2.15 538.47 96.93 635.40
TAPE 3M SCOTT +33 0.0500 ROLL 416.67 353.11 63.56 17.66 3.18 20.83
ABRAZADERA DE 1/2" 4.0000 UD 2.98 2.53 0.45 10.10 1.82 11.92
TARUGO AZUL C/TORNILLO 4.0000 UD 15.00 12.71 2.29 50.85 9.15 60.00
TORNILLO HEXAGONAL DE 1/4 X 1-1/2" 2.0000 UD 2.05 1.74 0.31 3.48 0.63 4.11
EXPANSION DE 1/4 X 1-1/2" 2.0000 UD 24.00 20.34 3.66 40.68 7.32 48.00
Lamp. Led 2´x 2´- Superf. 1.0000 UD 2,100.00 1,779.66 320.34 1,779.66 320.34 2,100.00
MANO DE OBRA 1.0000 PA 885.94 885.94 0.00 885.94
COSTO/UD 3,768.60 518.88 4,287.47

1.902 Salida de interruptor sencillo inc. Accesorios

CAJA RECTANGULAR DE 1/2" 1.0000 UD 120.43 102.06 18.37 102.06 18.37 120.43
Tubos de 1/2'' x 20'', P.V.C. SDR-26 1.5000 UD 113.89 96.52 17.37 144.78 26.06 170.84
Curva plastica 1/2" 2.0000 PL 5.30 4.49 0.81 8.98 1.62 10.60
ALAMBRE THW #12 45.0000 PL 14.12 11.97 2.15 538.47 96.93 635.40
TAPE 3M SCOTT +33 0.0500 ROLL 416.67 353.11 63.56 17.66 3.18 20.83
INT SEN. BTICINO 1.0000 UD 95.00 80.51 14.49 80.51 14.49 95.00
MANO DE OBRA 1.0000 PA 885.94 885.94 0.00 885.94
COSTO/UD 1,778.39 160.64 1,939.04

1.903 Salida de interruptor doble inc. Accesorios

CAJA RECTANGULAR DE 1/2" 1.0000 UD 120.43 102.06 18.37 102.06 18.37 120.43
Tubos de 1/2'' x 20'', P.V.C. SDR-26 1.5000 UD 113.89 96.52 17.37 144.78 26.06 170.84
Curva plastica 1/2" 2.0000 PL 5.30 4.49 0.81 8.98 1.62 10.60
ALAMBRE THW #12 45.0000 PL 14.12 11.97 2.15 538.47 96.93 635.40
TAPE 3M SCOTT +33 0.0500 ROLL 416.67 353.11 63.56 17.66 3.18 20.83
INT DOBLE BTICINO 1.0000 UD 249.35 211.31 38.04 211.31 38.04 249.35
MANO DE OBRA 1.0000 PA 885.94 885.94 0.00 885.94
COSTO/UD 1,909.20 184.19 2,093.39

1.904 Alimentacion modulo 3THW#10+ tub.PVC 1/2"

Tubo de 1/2" pvc 1.0000 PL 19.30 16.36 2.94 16.36 2.94 19.30
Suministro de alambre 10 3.0000 PL 8.32 7.05 1.27 21.15 3.81 24.95
M.O 0.4000 PL 44.25 17.70 0.00 17.70
COSTO/UD 55.21 6.75 61.96

1.10 PISOS

1.1001 H. a. b/piso (chapapote) c/malla e=0.10

Malla electrosoldada 2.7 x 2.7 10 x 10 0.1100 QQ 15,500.00 13,135.59 2,364.41 1,444.92 260.08 1,705.00
Hormigon chapapote 1.0500 M3 5,731.64 4,857.32 874.32 5,100.19 918.03 6,018.22
Madera a todo costo (GUARDERAS) 4.0000 ML 225.00 190.68 34.32 762.71 137.29 900.00
Mano obra malla 0.1100 M2 48.14 5.30 0.00 5.30
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 7,567.35 1,315.41 8,882.76
COSTO/MT² 68,794.09 11,958.24 80,752.33

1.1002 Piso de granito fondo gris 30*30 cms

Mosaico De Granito GRIS 1.0500 M2 5,824.00 4,935.59 888.41 5,182.37 932.83 6,115.20
Derretido Cemento Blanco (100 LBS) 0.0700 Fds 1,500.00 1,271.19 228.81 88.98 16.02 105.00
Mezcla 1:4 0.0320 m3 5,912.96 5,010.98 901.98 160.35 28.86 189.21
Colocacion Piso De Mosaicos De Granito 1.0000 m2 373.74 373.74 0.00 373.74
Corte De Chazos De 0.30 Mts 3.0000 Ud 25.00 75.00 0.00 75.00
MO derretido pisos 1.0000 m2 15.45 15.45 0.00 15.45
Herramientas (2%) 0.0200 P.A. 6,409.41 5,431.71 977.71 108.63 19.55 128.19
COSTO/M2 7,001.79

1.11 ACERAS PERIMETRALES

1.1101 Construcción de bordillos 2l 1L (BNP) y 1L ( SNP) INC. Zapata

Exc. En tierra 0.1800 m3 458.30 82.49 0.00 82.49


Relleno reposición manual 0.0400 m3 163.34 6.53 0.00 6.53
Bote de Material 0.0700 m3 1,288.31 90.18 0.00 90.18
Zapata bordillo Acera 0.0900 m3 12,088.76 10,244.71 1,844.05 922.02 165.96 1,087.99
Bloques de 6" B.N.P. 0.2000 m2 1,499.07 1,270.40 228.67 254.08 45.73 299.81
Pañete rateado- m.llana 0.2000 m2 293.91 249.07 44.83 49.81 8.97 58.78
Cantos 1.1000 ml 142.34 120.63 21.71 132.69 23.88 156.58
Pintura acrílica 0.2000 m2 276.38 234.22 42.16 46.84 8.43 55.28
COSTO/ML 1,584.66 252.98 1,837.65

1.1102 Relleno compactado (h=0.20m) ( caliche ) c/maquito

Alq. Compactador maquito 1.00 M3 10.42 8.83 1.59 8.83 1.59 10.42
Peones ( 3 ) 3.0000 Hr 102.97 308.91 0.00 308.91
Combustible (3 Galones/día) 0.3800 Gls 221.60 187.80 33.80 71.36 12.85 84.21
Lubricante 0.1500 Gls 84.21 71.36 12.85 10.70 1.93 12.63
SUB-TOTAL 416.16
Rendimiento 3.0000 Mt³/Hr 416.16 138.72 138.72
Material granular 1.5000 Mt³ 650.00 975.00 0.00 975.00
Regado y mojado 1.0000 Mt³ 175.00 175.00 175.00
Herramienta 0.0200 % 1,113.72 943.83 169.89 18.88 3.40 22.27
COSTO/MT³ 1,307.60 3.40 1,311.00

1.1103 Piso Hormigón simple violinado (h=0.10m) Violinado ( acera )

madera pino americano bruta 0.2200 P2 125.00 105.93 19.07 23.31 4.19 27.50
clavos corrientes con cabeza 2" en adelante 0.1100 LBS 60.00 50.85 9.15 5.59 1.01 6.60
mezcla 1:3 0.0210 m3 6,993.84 5,926.98 1,066.86 124.47 22.40 146.87
Hormigón 140 KG/cms2 (1:3:5) 0.0834 m3 6,116.15 5,183.18 932.97 432.28 77.81 510.09
construcción de ACERA FROTADA y VIOLINA 1.0000 m2 231.61 231.61 0.00 231.61
Herramientas (2%) 0.0200 P.A. 691.06 585.64 105.42 11.71 2.11 13.82
COSTO/MT² 828.96 107.52 936.49

1.1104 Zabaletas de piso

Mortero 1:3-A 0.0100 m3 6,993.84 5,926.98 1,066.86 59.27 10.67 69.94


Mano de Obra 1.0000 ml 58.39 58.39 0.00 58.39
Herramientas (2%) 0.0200 P.A. 69.94 59.27 10.67 1.19 0.21 1.40
COSTO/ML 118.84 10.88 129.73

1.12 PUERTAS

1.1201 S/C Puerta Lisa Polimetal (S/Visor) ( Desde 0.7@ 1.00*2.10) inc. Inst

Panel Polimetálico 0.70-1.00 x 2.10 1.0000 UND 7,203.52 6,104.68 1,098.84 6,104.68 1,098.84 7,203.52
Llavín Stanley 1.0000 UND 1,616.17 1,369.64 246.53 1,369.64 246.53 1,616.17
Transporte de Puerta (3%) 0.0300 % 8,819.69 7,474.32 1,345.38 224.23 40.36 264.59
Mano de obra Inst. de Puerta incluye Llavín 1.0000 UND 2,144.73 2,144.73 0.00 2,144.73
COSTO/UD 9,843.27 1,385.74 11,229.01

1.1202 Puertas lisa Polimetal 1.70*0.8mt ( cabina baños )

puerta de evedoor Inc. Marco 1.0000 UD 7,203.52 6,104.68 1,098.84 6,104.68 1,098.84 7,203.52
cerradura TOLEDO doble puño C/llave y SE 1.0000 UD 750.81 636.28 114.53 636.28 114.53 750.81
tarugos plásticoS 3/8" 12.0000 UD 2.54 2.15 0.39 25.82 4.65 30.47
tornillo 3" x 14 12.0000 UD 4.15 3.52 0.63 42.20 7.60 49.80
Bisagra 3.0000 UD 170.85 144.79 26.06 434.37 78.19 512.56
montura de puertas 0.4000 % 8,547.16 3,418.87 0.00 3,418.87
montura de cerradura especial 1.0000 ud 500.00 500.00 0.00 500.00
COSTO/UD 11,162.22 1,303.80 12,466.03

1.1203 Protectores hueco /puerta ( barra cuadrada 1/2"

Barra cuadrada 1/2" 4.8500 ud 519.20 440.00 79.20 2,134.00 384.12 2,518.12
Eléctrodo 6013 4.0000 lb 65.04 55.12 9.92 220.47 39.69 260.16
Thinner 0.0500 gl 416.67 353.11 63.56 17.66 3.18 20.83
Aguarra 0.0500 gl 555.87 471.08 84.79 23.55 4.24 27.79
Oxido Rojo 0.1800 gl 900.00 762.71 137.29 137.29 24.71 162.00
Pintura esmalte 0.1900 gl 1,130.00 957.63 172.37 181.95 32.75 214.70
Brocha 1 1/2" 1.0000 ud 101.15 85.72 15.43 85.72 15.43 101.15
Segueta 2.0000 ud 47.75 40.47 7.28 80.93 14.57 95.50
Disco de pulir 0.2500 ud 281.06 238.19 42.87 59.55 10.72 70.27
Mano de Obra 0.3500 % 3,470.52 1,214.68 0.00 1,214.68
COSTO/UD 4,155.80 529.40 4,685.20
COSTO/P² 386.28 49.21 435.49

1.13 VENTANAS (VER ESPECIFICACIONES)

1.1301 Aluminio superior aa (reforzada) e=0.048 inc. Operadores

Ventana de aluminio completa 1.0000 P² 325.00 275.42 49.58 275.42 49.58 325.00
Colocacion de ventana 0.3000 P² 325.00 97.50 0.00 97.50
COSTO/P² 372.92 49.58 422.50
COSTO/MT² 3,967.91 527.49 4,495.40

1.1302 Protectores hueco /ventanas ( barra cuadrada 1/2"

Barra cuadrada 1/2" 4.8500 ud 519.20 440.00 79.20 2,134.00 384.12 2,518.12
Eléctrodo 6013 4.0000 lb 65.04 55.12 9.92 220.47 39.69 260.16
Thinner 0.0500 gl 416.67 353.11 63.56 17.66 3.18 20.83
Aguarra 0.0500 gl 555.87 471.08 84.79 23.55 4.24 27.79
Oxido Rojo 0.1800 gl 900.00 762.71 137.29 137.29 24.71 162.00
Pintura esmalte 0.1900 gl 1,130.00 957.63 172.37 181.95 32.75 214.70
Brocha 1 1/2" 1.0000 ud 101.15 85.72 15.43 85.72 15.43 101.15
Segueta 2.0000 ud 47.75 40.47 7.28 80.93 14.57 95.50
Disco de pulir 0.2500 ud 281.06 238.19 42.87 59.55 10.72 70.27
Mano de Obra 0.3500 % 3,470.52 1,214.68 0.00 1,214.68
COSTO/UD 4,155.80 529.40 4,685.20
COSTO/P² 386.28 49.21 435.49

1.14 PINTURA (VER ESPECIFICACIONES)

1.1401 Pintura de base (1 mano) (económica)

Primer de base (1 manos) 0.1100 GLS 900.00 762.71 137.29 83.90 15.10 99.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 109.00 92.37 16.63 1.85 0.33 2.18
COSTO/MT² 52.22 0.33 52.55

1.1402 Acrílica en techo y viga ( 2 manos )

pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38

1.1403 Acrílica enmuros y columnas ( 2 manos )

pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38

1.1404 Mantenimiento en muros y columnas (h=1.50m) ( 2 manos )

pintura mantenimiento 0.0800 GLS 1,130.00 957.63 172.37 76.61 13.79 90.40
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 175.40 148.64 26.76 2.97 0.54 3.51
COSTO/MT² 220.42 25.77 246.19

1.1405 Mantenimiento en protectores ( 2 manos )

Suministro pintura esmalte 0.0400 GLN 1,130.00 957.63 172.37 38.31 6.89 45.20
Thinner 0.0500 GLN 416.67 353.11 63.56 17.66 3.18 20.83
M.O aplicación dos manos a pistola 1.0000 MT² 75.00 75.00 0.00 75.00
Desperdicios y retoques. 0.2000 66.03 55.96 10.07 11.19 2.01 13.21
COSTO/MT² 142.15 12.09 154.24

1.15 MISCELANEOS

1.1501 Figurita bronce baño

Figurita bronce baño 1.0000 Ud 1,073.42 909.68 163.74 909.68 163.74 1,073.42
Figurita bronce baño 0.1000 % 1,073.42 107.34 0.00 107.34
COSTO/Ud 1,017.02 163.74 1,180.76

1.16 CONSTRUCCION SEPTICO SENCILLO (1.7*3.40*1.70 ) mt

1.1601 Replanteo

Cal (50 LBS) 5.0000 FDA 260.00 220.34 39.66 1,101.69 198.31 1,300.00
Clavos Corrientes 20.0000 LBS 60.00 50.85 9.15 1,016.95 183.05 1,200.00
Madera Pino Americano Bruta (3 usos) 66.6667 P2 125.00 105.93 19.07 7,062.15 1,271.19 8,333.33
Clavos Acero 5.0000 LBS 55.10 46.69 8.41 233.47 42.03 275.50
Hilo de nylon 5.0000 LBS 168.30 142.63 25.67 713.14 128.36 841.50
Herramienta de Trabajo a mano 1.0000 PA 1,500.00 1,271.19 228.81 1,271.19 228.81 1,500.00
Maestro de Carpinteria 3.0000 Día 2,471.25 7,413.75 0.00 7,413.75
Maestro de Albañileria 3.0000 Día 2,471.25 7,413.75 0.00 7,413.75
Brigada Reducida Topografia 10.0000 Día 3,500.00 35,000.00 0.00 35,000.00
Estacion total 1.0000 Día 10,000.00 10,000.00 0.00 10,000.00
Carpintero de Segunda Categoria 3.0000 Día 1,568.75 4,706.25 0.00 4,706.25
Trabajador No calificado (TNC) 3.0000 Día 823.75 2,471.25 0.00 2,471.25
COSTO/UD 78,403.59 2,051.75 80,455.33
COSTO/m3 273.16 7.15 11,174.35

1.1602 Excavacion suelo Tipo 1 ( a mano )

EQUIPOS:
HERRAMIENTAS 0.0200 % 449.32 380.78 68.54 7.62 1.37 8.99
Sub-Total (1) Equipos

MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32
Sub-Total (3) Mano de Obra 449.32 0.00 449.32

COSTO/MT³ 456.93 1.37 458.30

1.1603 Relleno de reposicion (manual)

PALA "TRAMONTINA" 0.0100 UD 775.00 656.78 118.22 6.57 1.18 7.75


PICO "TRAMONTINA" 0.0100 UD 1,121.00 950.00 171.00 9.50 1.71 11.21
Regado, nivelado y apisonado de relleno 1.2000 m3 120.00 144.00 0.00 144.00
Herramientas (2%) 0.0200 P.A. 18.96 16.07 2.89 0.32 0.06 0.38
COSTO/MT³ 160.39 2.95 163.34

1.1604 Bote de material sobrante (e=1.25)

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73

MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

1.1605 Compactación material con maquito

Alq. Compactador maquito 1.00 M3 10.42 8.83 1.59 8.83 1.59 10.42
Peones ( 3 ) 3.0000 Hr 102.97 308.91 0.00 308.91
Combustible (3 Galones/día) 0.3800 Gls 221.60 187.80 33.80 71.36 12.85 84.21
Lubricante 0.1500 Gls 84.21 71.36 12.85 10.70 1.93 12.63
SUB-TOTAL 416.16
Rendimiento 3.0000 Mt³/Hr 416.16 138.72 138.72
Material granular 1.5000 Mt³ 650.00 975.00 0.00 975.00
Regado y mojado 1.0000 Mt³ 175.00 175.00 175.00
Herramienta 0.0200 % 1,113.72 943.83 169.89 18.88 3.40 22.27
COSTO/MT³ 1,307.60 3.40 1,311.00

1.1606 Zapata exc. p/cols (0.90*0.90*0.25) Ø1/2"@0.25

Acero 3/8'' 0.96 QQ 3,800.00 3,220.34 579.66 3,091.53 556.47 3,648.00


Alambre #18 1.92 lbs 100.00 84.74 15.25 162.70 29.29 191.99
Hormigon 180 kg/m2 industial 1.05 M3 6,852.58 5,807.27 1,045.31 6,097.64 1,097.57 7,195.21
Mano obra acero zapata 0.96 QQ 401.30 385.25 0.00 385.25
Personal por la casa 1.05 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 9,991.36 1,683.34 11,674.69

1.1607 Columnas ( 0.25*0.35 ) mt 4Ø1/2"+4Ø3/8", est.Ø3/8"@0.20

Acero Ø 1/2 ´´ de 20! 1.2710 QQ 3,800.00 3,220.34 684.00 4,829.80 869.36 4,829.80
Acero Ø 3/8 ´´ de 20! 1.7900 QQ 3,800.00 3,220.34 684.00 6,802.00 1,224.36 6,802.00
Hormigon 210 kg/m2 industial 1.0200 M3 7,205.15 6,106.06 1,296.93 7,349.25 1,322.86 7,349.25
Alambre No.18 6.1220 LBS 100.00 84.74 18.00 612.17 110.19 612.17
M.O acero 3.0610 QQ 401.30 1,228.38 0.00 1,228.38
Encofrado 14.2890 ML 600.00 8,573.40 0.00 8,573.40
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 29,649.24 3,526.78 29,649.24

1.1608 Losa de fondo 3/8" @0.20

Acero ¢3/8 1.2890 QQ 3,800.00 3,220.34 579.66 4,150.89 747.16 4,898.04


Alambre #18 2.5779 lbs 100.00 84.74 15.25 218.46 39.32 257.78
Hormigon 180 kg/m2 industial 1.0500 M3 6,852.58 5,807.27 1,045.31 6,097.64 1,097.57 7,195.21
Madera a todo costo 7.1429 M2 637.40 4,552.86 0.00 4,552.86
Mano obra acero 1.2890 QQ 401.30 517.26 0.00 517.26
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 15,791.34 1,884.06 17,675.39
COSTO/MT² 12,251.23 1,461.69 13,712.92

1.1609 Losa superior septico e=0.12me) mt Ø3/8"@0.20

Acero ¢3/8 1.2310 QQ 3,800.00 3,220.34 579.66 3,964.24 713.56 4,677.80


Alambre #18 2.5779 lbs 100.00 84.74 15.25 218.46 39.32 257.78
Hormigon 180 kg/m2 industial 1.0500 M3 6,852.58 5,807.27 1,045.31 6,097.64 1,097.57 7,195.21
Madera a todo costo 8.3330 M2 260.00 2,166.58 0.00 2,166.58
Mano obra acero 1.2310 QQ 401.30 494.00 0.00 494.00
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 13,195.15 1,850.46 15,045.61
COSTO/MT² 10,719.05 1,503.22 12,222.27

1.161 Block 8" acero vert. 20cm BNP

bloques de 0.20 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 57.00 48.31 8.69 621.93 111.95 733.88
acero 1/2" x 20' -G40 0.0850 QQ 3,800.00 3,220.34 579.66 273.73 49.27 323.00
alambre dulce #18 0.1700 Lbs 100.00 84.74 15.25 14.41 2.59 17.00
mezcla 1:3 0.0390 m3 6,993.84 5,926.98 1,066.86 231.15 41.61 272.76
Hormigón 140 KG/cms2 (1:3:5) 0.0890 m3 6,116.15 5,183.18 932.97 461.30 83.03 544.34
colocación bloques de 0.20 mts 13.0000 Ud 26.14 339.81 0.00 339.81
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.20 mts 13.0000 Ud 3.15 40.90 0.00 40.90
Herramientas (2%) 0.0200 P.A. 1,890.97 1,602.52 288.45 32.05 5.77 37.82
COSTO/M2 2,117.22 294.22 2,411.44

1.1611 Viga ( 0.20*0.20)3Ø1/2" +2Ø3/8" est.@0.15


Acero Ø1/2´´ de 25! 0.6080 QQ 3,800.00 3,220.34 684.00 2,310.40 415.87 2,310.40
Acero Ø 3/8´´ de 20! 1.1690 QQ 3,800.00 3,220.34 684.00 4,442.20 799.60 4,442.20
Alambre No.18 3.5540 LBS 100.00 84.74 18.00 355.38 63.97 355.38
Hormigón Industrial 210 kg /cm2 +5% 1.0200 MT³ 7,205.15 6,106.06 1,296.93 7,349.25 1,322.86 7,349.25
M.O acero 1.7770 QQ 637.40 1,132.66 0.00 1,132.66
Encofrado 25.0000 ML 400.00 10,000.00 0.00 10,000.00
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 25,844.13 2,602.30 25,844.13

1.1612 Zabaletas

Mortero 1:3-A 0.0100 m3 6,993.84 5,926.98 1,066.86 59.27 10.67 69.94


Mano de Obra 1.0000 ml 87.58 87.58 0.00 87.58
Herramientas (2%) 0.0200 P.A. 69.94 59.27 10.67 1.19 0.21 1.40
COSTO/Ml 148.04 10.88 158.92

1.1613 Careteo y/o fraguache

Escoba 0.0100 U 15.00 12.71 2.29 0.13 0.02 0.15


mezcla 1:6 0.0080 m3 4,712.52 3,993.66 718.86 31.95 5.75 37.70
fraguache con escoba 1.0000 m2 28.41 28.41 0.00 28.41
Andamios 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 37.85 32.08 5.77 0.64 0.12 0.76
COSTO/MT² 80.98 9.46 90.45

1.1614 Pañete pulido sin color

Regla (1 de 1"x4"x10' / 100 usos) 0.0333 P2 125.00 105.93 19.07 3.53 0.63 4.16
mezcla 1:1.5:5 (pañete) 0.0300 M3 2,972.64 2,519.19 453.45 75.58 13.60 89.18
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 187.07 187.07 0.00 187.07
Herramientas (2%) 0.0200 P.A. 4.16 3.53 0.63 0.07 0.01 0.08
COSTO/MT² 266.25 14.25 280.50

1.1615 Tapa hormigon p/registro de 1*1 mt c/orja

Acero Ø 3/8" 0.3008 qq 3,800.00 3,220.34 684.00 1,142.86 205.71 1,142.86


Alambre no. 18 0.6015 lb 100.00 84.74 18.00 60.15 10.83 60.15
Madera 18.1910 P² 125.00 105.93 22.50 2,273.88 409.30 2,273.88
Mano de obra 1.0000 UD 700.00 700.00 0.00 700.00
COSTO/UD 4,176.88 625.84 4,176.88

1.1616 Tuberias de 4" PVC ( drenaje ) todo incluido

Suministro de tuberia de 4'' SCH 40 1.0000 ML 265.32 224.85 40.47 224.85 40.47 265.32
Piezas especiales 1.0000 ud 1,200.00 1,016.95 183.05 1,016.95 183.05 1,200.00
Cemento pvc 0.0200 gl 1,799.00 1,524.58 274.42 30.49 5.49 35.98
Asiento de arena 0.0900 m3 1,334.54 120.11 0.00 120.11
Desperdicio 0.0500 M3N 164.99 139.82 25.17 6.99 1.26 8.25
Excavacion de material 0.3600 m3 458.30 164.99 0.00 164.99
Bote de Material 0.3600 m3 1,288.31 463.79 0.00 463.79
Instalacion de tuberias 1.0000 ml 54.17 54.17 0.00 54.17
COSTO/ML 2,082.34 230.27 2,312.61

1.1617 Tapon Hembra 4" pvc presion

Tapon hembra de 4" 1.0000 Ud 253.97 215.23 45.71 253.97 45.71 253.97
M.O. Colocacion Tapon hembra de 4" 0.2500 Ud 253.97 63.49 0.00 63.49
COSTO/UD 317.46 45.71 363.18

ANALISIS VARIOS

Excavacion tierra mano

EQUIPOS:
HERRAMIENTAS 2.0000 % M.O. 8.99 0.00 8.99
Sub-Total (1) Equipos 8.99 0.00 8.99

MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32

Sub-Total (3) Mano de Obra 449.32 449.32

COSTO/MT³ 458.30 0.00 458.30

Relleno de reposición traslado,regado y comp.

PALA "TRAMONTINA" 0.0100 UD 775.00 656.78 118.22 6.57 1.18 7.75


PICO "TRAMONTINA" 0.0100 UD 1,121.00 950.00 171.00 9.50 1.71 11.21
Regado, nivelado y apisonado de relleno 1.2000 m3 120.00 144.00 0.00 144.00
Herramientas (2%) 0.0200 P.A. 18.96 16.07 2.89 0.32 0.06 0.38
COSTO/MT³ 160.39 2.95 163.34

Bote de material

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73

MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

Losa de fondo 3/8" @0.20

Acero ¢3/8 1.2890 QQ 3,800.00 3,220.34 579.66 4,150.89 747.16 4,898.04


Alambre #18 2.5779 lbs 100.00 84.74 15.25 218.46 39.32 257.78
Hormigon 180 kg/m2 industial 1.0500 M3 6,852.58 5,807.27 1,045.31 6,097.64 1,097.57 7,195.21
Madera a todo costo 7.1429 M2 260.00 1,857.14 0.00 1,857.14
Mano obra acero 1.2890 QQ 401.30 517.26 0.00 517.26
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 13,095.62 1,884.06 14,979.68
COSTO/MT² 10,159.84 1,461.69 11,621.53

Losa superior

Acero ¢3/8 1.2310 QQ 3,800.00 3,220.34 579.66 3,964.24 713.56 4,677.80


Alambre #18 2.5779 lbs 100.00 84.74 15.25 218.46 39.32 257.78
Hormigon 180 kg/m2 industial 1.0500 M3 6,852.58 5,807.27 1,045.31 6,097.64 1,097.57 7,195.21
Madera a todo costo 8.3330 M2 260.00 2,166.58 0.00 2,166.58
Mano obra acero 1.2310 QQ 401.30 494.00 0.00 494.00
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 13,195.15 1,850.46 15,045.61
COSTO/MT² 10,719.05 1,503.22 12,222.27

Bloques de 6" B.N.P.

Bloques horm. + 4% desp. + itbis 13.0000 u 44.00 37.29 6.71 484.75 87.25 572.00
Mortero 1:3 en juntas + 30% desp. 0.0312 m3 6,993.84 5,926.98 1,066.86 184.92 33.29 218.21
Horm. en cámaras + 10% desp. 0.0200 m3 5,731.64 4,857.32 874.32 97.15 17.49 114.63
Acero 3/8" x 20' grado 40 + 20% desp. 0.0592 qq 3,800.00 3,220.34 579.66 190.64 34.32 224.96
Alambre No. 18 0.0888 LBS 100.00 84.74 15.25 7.53 1.35 8.88
Corte y amarre varilla. 13.0000 u 1.05 13.66 0.00 13.66
Llenado huecos. 13.0000 u 3.15 40.90 0.00 40.90
Coloc. bloques. 13.0000 u 23.53 305.83 0.00 305.83
COSTO/MT² 1,325.38 173.70 1,499.07

Bloques de 6" S.N.P.

Bloques horm. + 4% desp. + itbis 13.0000 u 44.00 37.29 6.71 484.75 87.25 572.00
Mortero 1:3 en juntas + 30% desp. 0.0312 m3 6,993.84 5,926.98 1,066.86 184.92 33.29 218.21
Horm. en cámaras + 10% desp. 0.0200 m3 5,731.64 4,857.32 874.32 97.15 17.49 114.63
Acero 3/8" x 20' grado 40 + 20% desp. 0.0592 qq 3,800.00 3,220.34 579.66 190.64 34.32 224.96
Alambre No. 18 0.0888 LBS 100.00 84.74 15.25 7.53 1.35 8.88
Corte y amarre varilla. 13.0000 u 1.05 13.66 0.00 13.66
Llenado huecos. 13.0000 u 3.15 40.90 0.00 40.90
Coloc. bloques. 13.0000 u 23.53 305.83 0.00 305.83
COSTO/MT² 1,325.38 173.70 1,499.07

Pañete rateado- m.llana

Regla (1 de 1"x4"x10' / 100 usos) 0.0333 P2 125.00 105.93 19.07 3.53 0.63 4.16
mezcla 1: 4 0.0300 M3 5,912.96 5,010.98 901.98 150.33 27.06 177.39
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 112.27 112.27 0.00 112.27
Herramientas (2%) 0.0200 P.A. 4.16 3.53 0.63 0.07 0.01 0.08
COSTO/MT² 266.20 27.71 293.91

mezcla 1:3

cemento gris 11.5100 Fds 480.00 406.78 73.22 4,682.03 842.77 5,524.80
arena gruesa ITABO (de mina) 1.0000 m3 1,200.00 1,200.00 0.00 1,200.00
agua 69.0400 Gls 1.00 69.04 0.00 69.04
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
COSTO/MT³ 6,151.07 842.77 6,993.84

mezcla 1:3-A

cemento gris 11.5100 Fds 480.00 406.78 73.22 4,682.03 842.77 5,524.80
arena gruesa ITABO LAVADA (de PLANTA) 1.0000 m3 1,200.00 1,200.00 0.00 1,200.00
agua 69.0400 Gls 1.00 69.04 0.00 69.04
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
COSTO/MT³ 6,151.07 842.77 6,993.84

mezcla 1:4

cemento gris 9.1100 Fds 480.00 406.78 73.22 3,705.76 667.04 4,372.80
arena gruesa ITABO (de mina) 1.0600 m3 1,200.00 1,272.00 0.00 1,272.00
agua 68.1600 Gls 1.00 68.16 0.00 68.16
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
COSTO/MT³ 5,245.92 667.04 5,912.96

mezcla 1:6

cemento gris 6.4600 Fds 480.00 406.78 73.22 2,627.80 473.00 3,100.80
arena gruesa ITABO (de mina) 1.1200 m3 1,200.00 1,344.00 0.00 1,344.00
agua 67.7200 Gls 1.00 67.72 0.00 67.72
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
COSTO/MT³ 4,239.52 473.00 4,712.52

mezcla 1:1.5:5 (pañete)

cemento gris 9.4600 Fds 480.00 406.78 73.22 3,848.14 692.66 4,540.80
arena FINA (para pañete) 0.9100 m3 1,200.00 1,092.00 0.00 1,092.00
cal (50 LBS) 6.2900 Fds 260.00 220.34 39.66 1,385.93 249.47 1,635.40
agua 45.2400 Gls 1.00 45.24 0.00 45.24
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
COSTO/MT³ 2,723.17 249.47 2,972.64

mezcla 1:1.5:5 (pañete) CON ARENA GRUESA

cemento gris 9.4600 Fds 480.00 406.78 73.22 3,848.14 692.66 4,540.80
Arena lavada 0.9100 m3 1,500.00 1,365.00 0.00 1,365.00
cal (50 LBS) 6.2900 Fds 260.00 220.34 39.66 1,385.93 249.47 1,635.40
agua 45.2400 Gls 1.00 45.24 0.00 45.24
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
COSTO/MT³ 2,996.17 249.47 3,245.64

mezcla 1:2:5 (pañete en techo)

cemento gris 11.9700 Fds 480.00 406.78 73.22 4,869.15 876.45 5,745.60
arena FINA (para pañete) 0.8700 m3 1,500.00 1,305.00 0.00 1,305.00
cal (50 LBS) 6.0000 Fds 260.00 220.34 39.66 1,322.03 237.97 1,560.00
agua 43.1200 Gls 1.00 43.12 0.00 43.12
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
COSTO/MT³ 2,870.15 237.97 3,108.12

mezcla para natilla

cemento gris 40.6100 FDS 480.00 406.78 73.22 16,519.32 2,973.48 19,492.80
agua 121.5200 GLS 1.00 121.52 0.00 121.52
COSTO/MT³ 16,640.84 2,973.48 19,614.32

mezcla 1:2

cemento gris 15.5700 Fds 480.00 406.78 73.22 6,333.56 1,140.04 7,473.60
arena gruesa ITABO (de mina) 0.9000 m3 1,200.00 1,080.00 0.00 1,080.00
agua 70.1000 Gls 1.00 70.10 0.00 70.10
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
COSTO/MT³ 7,683.66 1,140.04 8,823.70

Hormigón 100 KG/cms2 (Ligadora)

Materiales:
cemento gris 6.3500 Fds 480.00 406.78 73.22 2,583.05 464.95 3,048.00
arena gruesa ITABO LAVADA (de PLANTA) 0.5400 m3 1,500.00 810.00 0.00 810.00
gravilla 3/4 @ 3/8" 0.7300 m3 1,500.00 1,095.00 0.00 1,095.00
agua 64.0000 Gls 1.00 64.00 0.00 64.00
SUB-TOTAL DE MATERIALES 4552.05 464.95 5,017.00

Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 112.66 112.66 0.00 112.66
Ayudante albañil (1) 1.0000 Hr. 112.66 112.66 0.00 112.66
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 328.28 328.28
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 187.59 0.00 187.59

Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 500.00 0.00 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA
HERRAMIENTAS: 5 % M.O. 0.00 0.00 0.00 0.00 0.00
SUB-TOTAL DE EQUIPOS 0.00 0.00 0.00

COSTO/MT³ 4,739.64 464.95 5,204.59


COSTO/MT² 473.96 46.49 520.46

Hormigón 140 KG/cms2 (Ligadora)

Materiales:
cemento gris 7.5300 Fds 480.00 406.78 73.22 3,063.05 551.35 3,614.40
arena gruesa ITABO LAVADA (de PLANTA) 0.5200 m3 1,500.00 780.00 0.00 780.00
gravilla 3/4 @ 3/8" 0.7300 m3 1,500.00 1,095.00 0.00 1,095.00
agua 54.6500 Gls 1.00 54.65 0.00 54.65
SUB-TOTAL DE MATERIALES 4992.70 551.35 5,544.05

Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 112.66 112.66 0.00 112.66
Ayudante albañil (1) 1.0000 Hr. 112.66 112.66 0.00 112.66
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 328.28 328.28
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 187.59 0.00 187.59

Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 500.00 0.00 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA
HERRAMIENTAS: 5 % M.O. 0.00 0.00 0.00 0.00 0.00
SUB-TOTAL DE EQUIPOS 0.00 0.00 0.00

COSTO/MT³ 5,180.29 551.35 5,731.64


COSTO/MT² 518.03 55.13 573.16

Hormigón 180 KG/cms2 (Ligadora)

Materiales:
cemento gris 8.3100 Fds 480.00 406.78 73.22 3,380.34 608.46 3,988.80
arena gruesa ITABO LAVADA (de PLANTA) 0.5100 m3 1,500.00 765.00 0.00 765.00
gravilla 3/4 @ 3/8" 0.7100 m3 1,500.00 1,065.00 0.00 1,065.00
agua 51.2200 Gls 1.00 51.22 0.00 51.22
SUB-TOTAL DE MATERIALES 5261.56 608.46 5,870.02

Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 112.66 112.66 0.00 112.66
Ayudante albañil (1) 1.0000 Hr. 112.66 112.66 0.00 112.66
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 328.28 328.28
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 187.59 0.00 187.59

Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 500.00 0.00 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA
HERRAMIENTAS: 5 % M.O. 0.00 0.00 0.00 0.00 0.00
SUB-TOTAL DE EQUIPOS 0.00 0.00 0.00

COSTO/MT³ 5,449.15 608.46 6,057.61


COSTO/MT² 544.91 60.85 605.76

Hormigón 210 KG/cms2 (Ligadora)

Materiales:
cemento gris 8.9400 Fds 480.00 406.78 73.22 3,636.61 654.59 4,291.20
arena gruesa ITABO LAVADA (de PLANTA) 0.5100 m3 1,500.00 765.00 0.00 765.00
gravilla 3/4 @ 3/8" 0.7000 m3 1,500.00 1,050.00 0.00 1,050.00
agua 51.2200 Gls 1.00 51.22 0.00 51.22
SUB-TOTAL DE MATERIALES 5502.83 654.59 6,157.42

Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 112.66 112.66 0.00 112.66
Ayudante albañil (1) 1.0000 Hr. 112.66 112.66 0.00 112.66
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 328.28 328.28
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 187.59 0.00 187.59

Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 500.00 0.00 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA
HERRAMIENTAS: 5 % M.O. 0.00 0.00 0.00 0.00 0.00
SUB-TOTAL DE EQUIPOS 0.00 0.00 0.00

COSTO/MT³ 5,690.42 654.59 6,345.01


COSTO/MT² 569.04 65.46 634.50

Careteo y/o fraguache

Escoba 0.0100 U 15.00 12.71 2.29 0.13 0.02 0.15


mezcla 1:6 0.0080 m3 4,712.52 3,993.66 718.86 31.95 5.75 37.70
fraguache con escoba 1.0000 m2 28.41 28.41 0.00 28.41
Andamios 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 37.85 32.08 5.77 0.64 0.12 0.76
COSTO/MT² 80.98 9.46 90.45

Cantos En Vigas - Losas - Columnas

madera pino americano cepillada 0.2590 P2 111.11 94.16 16.95 24.39 4.39 28.78
mezcla 1:1.5:5 (pañete) 0.0040 m3 7,513.44 6,367.32 1,146.12 25.47 4.58 30.05
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 58.83 49.86 8.97 1.00 0.18 1.18
COSTO/ML 133.19 9.15 142.34

BASE

Excavación Zapata de muro a mano tierra 0.6120 m3 458.30 280.48 0.00 280.48
Relleno de Reposición + 25% 1.1280 m3 163.34 184.25 0.00 184.25
Bote de material + 30% 0.6120 m3 1,288.31 788.45 0.00 788.45
Losa de Tarja Ø3/8´´@0.20m A.D 0.1872 m3 14,979.68 12,694.64 2,285.04 2,376.44 427.76 2,804.20
BNP, Bastones @ 0.40 todos los huecos llen 1.2400 m2 1,629.09 1,380.58 248.50 1,711.92 308.15 2,020.07
SNP, Bastones @ 0.40 todos los huiecos llen 1.2400 m2 1,692.18 1,434.05 258.13 1,778.22 320.08 2,098.30
Fraguache 3.5800 m2 90.45 76.65 13.80 274.41 49.39 323.80
Pañete 3.5800 m2 382.85 324.45 58.40 1,161.52 209.07 1,370.60
Cantos y mochetas 7.0000 ml 142.34 120.63 21.71 844.40 151.99 996.39
Pintura Base 3.5800 m2 52.55 44.53 8.02 159.43 28.70 188.13
Pintura Acrilica 3.5800 m2 276.38 234.22 42.16 838.51 150.93 989.44
COSTO/UND 10,398.02 1,646.07 12,044.10

Pañete en muro de bloques

madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er.
nivel 1.0000 M2 187.07 187.07 0.00 187.07
andamios 1.0000 M2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/MT² 352.98 29.86 382.85

Mocheta

Mortero 1:4 para empañete + 10% desp. 0.0036 M3 5,912.96 5,010.98 901.98 18.04 3.25 21.29
Regla madera americana cepillada 1"x4" / 0.8300 PT 111.11 94.16 16.95 78.15 14.07 92.22
4 usos
Mano de obra mocheta 0.20m 1.0000 ML 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 113.51 96.19 17.31 1.92 0.35 2.27
COSTO/MT² 180.45 17.66 198.11

Andamios Interiores
Madera Pino Americano Bruta 0.1820 P2 125.00 105.93 19.07 19.28 3.47 22.75
Colocación Andamio Interior 0.02 dia 1,964.25 39.29 0.00 39.29
Clavo corriente 0.010 LBS 60.00 50.85 9.15 0.51 0.09 0.60
Herramientas (2%) 0.0200 P.A. 22.75 19.28 3.47 0.39 0.07 0.46
COSTO/MT² 59.46 3.63 63.09

Andamios madera para colocación bloques


Volumen Análisis 1.00 M2
Materiales y Equipos
Madera bruta 6 usos 0.08 PT RD$105.93 RD$19.07 RD$8.83 RD$1.59
Clavos corriente 0.042 LBS RD$50.85 RD$9.15 RD$2.12 RD$0.38
Mano de Obra
Confección andamios - T1 0.02 DIA RD$1,964.25 RD$0.00 RD$39.29 RD$0.00
Total/UND RD$50.24 RD$1.97 RD$52.21

muros block 0.10 mts sin CRUCE 0 3/8" A 0.80 mts BNP

bloques de 0.10 mts (4") TAVARES INDUSTRI 12.8750 Ud 25.00 21.19 3.81 272.78 49.10 321.88
acero 3/8" x 20' -G40 0.0230 QQ 3,800.00 3,220.34 579.66 74.07 13.33 87.40
alambre dulce #18 0.0460 Lbs 100.00 84.74 15.25 3.90 0.70 4.60
mezcla 1:3 0.0300 m3 6,993.84 5,926.98 1,066.86 177.81 32.01 209.82
Hormigón 140 KG/cms2 (1:3:5) 0.0070 m3 6,116.15 5,183.18 932.97 36.28 6.53 42.81
colocación bloques de 0.10 mts. 13.0000 Ud 28.23 366.99 0.00 366.99
llenado de huecos A 0.80 mts 13.0000 Ud 2.10 27.33 0.00 27.33
corte y amarre de acero A 0.80 mts 13.0000 Ud 1.05 13.66 0.00 13.66
Herramientas (2%) 0.0200 P.A. 413.87 350.74 63.13 7.01 1.26 8.28
COSTO/MT² 979.83 102.93 1,082.76

Asiento de arena

PALA "TRAMONTINA" 0.0100 UD 775.00 656.78 118.22 6.57 1.18 7.75


PICO "TRAMONTINA" 0.0100 UD 1,121.00 950.00 171.00 9.50 1.71 11.21
regado, nivelado y apisonado de relleno 1.2000 m3 76.00 91.20 0.00 91.20
arena gruesa ITABO (de mina) 1.0000 m3 1,200.00 1,200.00 0.00 1,200.00
Herramientas (2%) 0.0200 P.A. 1,218.96 1,033.02 185.94 20.66 3.72 24.38
COSTO/MT³ 1,327.93 6.61 1,334.54

Zapata muros 6" (0.45 x 0.25) 3Ø3/8"

Acero 3/8'' 0.7700 QQ 3,800.00 3,220.34 579.66 2,479.66 446.34 2,926.00


Acero 1/2'' 0.0000 QQ 3,800.00 3,220.34 579.66 0.00 0.00 0.00
Alambre #18 1.5400 lbs 100.00 84.74 15.25 130.50 23.49 153.99
Hormigon 210 kg/m2 (Inc. bombeo) 1.0500 M3 7,205.15 6,106.06 1,099.09 6,411.36 1,154.04 7,565.40
Mano obra acero zapata de muros 8.8900 ml 133.76 1,189.13 0.00 1,189.13
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
COSTO/MT³ 10,464.89 1,623.87 12,088.76

Cerámica pared blanco (0.20 x0.20)

derretido cemento blanco (100 LBS) 0.0333 FDS 795.03 673.76 121.28 22.44 4.04 26.47
cerámica 20 x 20 Area de lavado 1.1000 M2 738.83 626.12 112.70 688.74 123.97 812.71
ESTOPA 0.0500 LBS 125.00 105.93 19.07 5.30 0.95 6.25
Pegamento Especial para Ceramica 0.1667 fda 522.00 442.37 79.63 73.73 13.27 87.00
colocación en paredes de losetas cerámica 1.0000 M2 575.71 575.71 0.00 575.71
corte de losetas de cerámica 4.5000 UD 5.00 22.50 0.00 22.50
Herramientas (2%) 0.0300 P.A. 932.43 790.20 142.24 23.71 4.27 27.97
COSTO/MT² 1,412.11 146.50 1,558.62

Llave de chorro

llave chorro 3/4" 1.0000 UD 692.64 586.99 105.66 586.99 105.66 692.64
Tuberia y piezas 1.0000 PA 250.00 211.86 38.14 211.86 38.14 250.00
instalación llave 1.0000 Ud 1,416.63 1,416.63 0.00 1,416.63
COSTO/UD 2,215.48 143.79 2,359.27

Desague de 2"

sifón drenaje 2" 1.0000 UD 87.74 74.36 13.38 74.36 13.38 87.74
rejilla roscada de 2" HG para piso 1.0000 UD 70.00 59.32 10.68 59.32 10.68 70.00
desague de piso de 2 pulgadas (Incl. Parrilla 1.0000 Ud 809.27 809.27 0.00 809.27
COSTO/UD 942.95 24.06 967.01

Primer de base (1 mano)

Primer de base (1 manos) 0.1100 GLS 900.00 762.71 137.29 83.90 15.10 99.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 109.00 92.37 16.63 1.85 0.33 2.18
COSTO/MT² 52.22 0.33 52.55

pintura acrílica

pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38

BNP, Bastones @ 0.40 todos los huecos llenos


Bloques horm. + 4% desp. + itbis 13.0000 u 44.00 37.29 7.92 572.00 102.96 572.00
Mortero 1:3 en juntas + 30% desp. 0.0312 m3 6,993.84 5,926.98 1,258.89 218.21 39.28 218.21
Horm. en cámaras + 10% desp. 0.0400 m3 6,116.15 5,183.18 1,100.91 244.65 44.04 244.65
Acero 3/8" x 20' grado 40 + 20% desp. 0.0592 qq 3,800.00 3,220.34 684.00 224.96 40.49 224.96
Alambre No. 18 0.0888 LBS 100.00 8.88 0.00 8.88
Corte y amarre varilla. 13.0000 u 1.05 13.66 0.00 13.66
Llenado huecos. 13.0000 u 3.15 40.90 0.00 40.90
Coloc. bloques. 13.0000 u 23.53 19.94 4.23 305.83 55.05 305.83
COSTO/MT² 1,629.09 281.81 1,629.09

SNP, Bastones @ 0.40 todos los huecos llenos

Bloques horm. + 4% desp. + itbis 13.0000 u 44.00 37.29 7.92 572.00 102.96 572.00
Mortero 1:3 en juntas + 30% desp. 0.0312 m3 6,993.84 5,926.98 1,258.89 218.21 39.28 218.21
Horm. en cámaras + 10% desp. 0.0400 m3 6,116.15 5,183.18 1,100.91 244.65 44.04 244.65
Acero 3/8" x 20' grado 40 + 20% desp. 0.0592 qq 3,800.00 3,220.34 684.00 224.96 40.49 224.96
Alambre No. 18 0.0888 LBS 100.00 84.74 18.00 8.88 1.60 8.88
Corte y amarre varilla. 13.0000 u 1.05 13.66 0.00 13.66
Llenado huecos. 13.0000 u 3.15 40.90 0.00 40.90
Coloc. bloques. 13.0000 u 23.53 305.83 0.00 305.83
Andamio 1.0000 M2 63.09 53.47 11.36 63.09 11.36 63.09
COSTO/MT² 1,692.18 239.72 1,692.18

Pañete

madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. 1.0000 M2 187.07 187.07 0.00 187.07
nivel
andamios 1.0000 M2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/MT² 352.98 29.86 382.85

PERSONAL POR LA CASA PARA VACIADOS(REND. 30.00 M3)

Capataz 0.5000 h/d 2,471.25 1,235.63 0.00 1,235.63


Albañil de 2da. Cat. 1.0000 h/d 1,568.75 1,568.75 0.00 1,568.75
Ayudante albañil 1.1000 h/d 1,058.75 1,164.63 0.00 1,164.63
Obreros 4.0000 h/d 823.75 3,295.00 0.00 3,295.00
RD$/total 7,264.00
RD$/M3 242.13

HASTA AQUÍ MALAQUIAS GIL

#VALUE! TERMINACION DE TECHO

#VALUE! Fino En Techo (2DO Nivel)

madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0400 m3 #REF! #REF! #REF! #REF! #REF! #REF!
fino en techo horiz. sin incl. subida de mater 1.0000 m2 164.22 164.22 0.00 164.22
Herramientas (2%) 0.0200 P.A. #REF! #REF! #REF! #REF! #REF! #REF!
COSTO/MT² #REF! #REF! #REF!

#VALUE! Imperm. Tela Asfaltica De 4Mm (Granular)

Prime + 10% 0.0500 GL/MT² 1,375.00 1,165.25 209.75 58.26 10.49 68.75
Manto asfartico e= 4mm+10% 1.1000 MT² 501.87 425.31 76.56 467.84 84.21 552.06
Pintura de aluminio 0.0500 GL/MT² 1,100.00 932.20 167.80 46.61 8.39 55.00
Aplicación impermeabilizante 1.0000 MT² 26.71 26.71 0.00 26.71
COSTO/MT² 599.43 103.09 702.52

#VALUE! Zabaleta En Techo (1Er Nivel)

Mortero 1:3-A 0.0100 m3 #REF! #REF! #REF! #REF! #REF! #REF!


Mano de Obra 1.0000 ml 87.58 87.58 0.00 87.58
Herramientas (2%) 0.0200 P.A. #REF! #REF! #REF! #REF! #REF! #REF!
COSTO/Ml #REF! #REF! #REF!

2.3 PINTURA

2.301 Pintura De Mantenimiento En Muros Y Columnas (2 Manos)

pintura mantenimiento 0.0800 GLS 1,130.00 957.63 172.37 76.61 13.79 90.40
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 175.40 148.64 26.76 2.97 0.54 3.51
COSTO/MT² 220.42 25.77 246.19

2.302 Pintura Acrilica En Muros Y Columnas (2 Manos)

pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38

3 MODULO II: 4 AULAS Y BAÑOS


3.1 DESMONTES Y DEMOLICIONES

3.101 Desmonte De Lona Asfaltica (Inc. Bajada De Materiales)

Espatula 0.0300 UD 130.00 110.17 19.83 3.31 0.59 3.90


Cuchilla 0.0300 UD 175.00 148.31 26.69 4.45 0.80 5.25
Mano de obra levantamiento impermeabiliz 1.0000 M2 25.00 25.00 0.00 25.00
Bajada de material 0.0600 M3 260.00 15.60 0.00 15.60
COSTO/MT² 48.35 1.40 49.75

3.102 Demolicion De Fino E=10Cms


Maseta 0.0100 Und 625.00 743.22 133.78 7.43 1.34 8.77
Cinsel 0.0100 Und 225.00 330.51 59.49 3.31 0.59 3.90
Pala 0.0100 Und 775.00 576.27 103.73 5.76 1.04 6.80
Pico 0.0100 Und 1,121.00 737.29 132.71 7.37 1.33 8.70
Martillo 0.0100 Und 240.00 385.59 69.41 3.86 0.69 4.55
Carretilla 3Pie 0.0050 Und 5,500.00 4,000.00 720.00 20.00 3.60 23.60
M.O demolicion fino techo inclinado 1.0000 Mt² 120.00 95.00 0.00 95.00
Traslado material de demolicion de fino tec 0.1500 D/H 95.00 12.00 0.00 12.00
COSTO/MT² 154.73 8.59 163.32
COSTO/MT³ 1,547.29 85.91 1,633.20
3.103 Bote De Material (Inc. Carguio) D=5Km

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73

MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

3.2 TERMINACION DE TECHO

3.201 Fino En Techo (2DO Nivel)

madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0400 m3 #REF! #REF! #REF! #REF! #REF! #REF!
fino en techo horiz. sin incl. subida de mater 1.0000 m2 164.22 164.22 0.00 164.22
Herramientas (2%) 0.0200 P.A. #REF! #REF! #REF! #REF! #REF! #REF!
COSTO/MT² #REF! #REF! #REF!

3.202 Imperm. Tela Asfaltica De 4Mm (Granular)

Prime + 10% 0.0500 GL/MT² 1,375.00 1,165.25 209.75 58.26 10.49 68.75
Manto asfartico e= 4mm+10% 1.1000 MT² 501.87 425.31 76.56 467.84 84.21 552.06
Pintura de aluminio 0.0500 GL/MT² 1,100.00 932.20 167.80 46.61 8.39 55.00
Aplicación impermeabilizante 1.0000 MT² 26.71 26.71 0.00 26.71
COSTO/MT² 599.43 103.09 702.52

3.203 Zabaleta En Techo (1Er Nivel)

Mortero 1:3-A 0.0100 m3 #REF! #REF! #REF! #REF! #REF! #REF!


Mano de Obra 1.0000 ml 87.58 87.58 0.00 87.58
Herramientas (2%) 0.0200 P.A. #REF! #REF! #REF! #REF! #REF! #REF!
COSTO/Ml #REF! #REF! #REF!

3.3 PINTURA

3.301 Pintura De Mantenimiento En Muros Y Columnas (2 Manos)

pintura mantenimiento 0.0800 GLS 1,130.00 957.63 172.37 76.61 13.79 90.40
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 175.40 148.64 26.76 2.97 0.54 3.51
COSTO/MT² 220.42 25.77 246.19

3.302 Pintura Acrilica En Muros Y Columnas (2 Manos)

pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38

4 MODULO III: 3 AULAS INICIAL

4.1 DESMONTES Y DEMOLICIONES

4.101 Desmonte De Lona Asfaltica (Inc. Bajada De Materiales)

Espatula 0.0300 UD 130.00 110.17 19.83 3.31 0.59 3.90


Cuchilla 0.0300 UD 175.00 148.31 26.69 4.45 0.80 5.25
Mano de obra levantamiento impermeabiliz 1.0000 M2 25.00 25.00 0.00 25.00
Bajada de material 0.0600 M3 260.00 15.60 0.00 15.60
COSTO/MT² 48.35 1.40 49.75

4.102 Demolicion De Fino E=10Cms


Maseta 0.0100 Und 625.00 743.22 133.78 7.43 1.34 8.77
Cinsel 0.0100 Und 225.00 330.51 59.49 3.31 0.59 3.90
Pala 0.0100 Und 775.00 576.27 103.73 5.76 1.04 6.80
Pico 0.0100 Und 1,121.00 737.29 132.71 7.37 1.33 8.70
Martillo 0.0100 Und 240.00 385.59 69.41 3.86 0.69 4.55
Carretilla 3Pie 0.0050 Und 5,500.00 4,000.00 720.00 20.00 3.60 23.60
M.O demolicion fino techo inclinado 1.0000 Mt² 120.00 95.00 0.00 95.00
Traslado material de demolicion de fino tec 0.1500 D/H 95.00 12.00 0.00 12.00
COSTO/MT² 154.73 8.59 163.32
COSTO/MT³ 1,547.29 85.91 1,633.20

4.103 Bote De Material (Inc. Carguio) D=5Km

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73

MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

4.2 TERMINACION DE TECHO

4.201 Fino En Techo (1Er Nivel)

madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0400 m3 6,993.84 5,926.98 1,066.86 237.08 42.67 279.75
fino en techo horiz. sin incl. subida de mater 1.0000 m2 114.27 114.27 0.00 114.27
Herramientas (2%) 1.0000 P.A. 7.91 6.71 1.21 6.71 1.21 7.91
COSTO/MT² 359.43 44.13 403.56

4.202 Imperm. Tela Asfaltica De 4Mm (Granular)

Prime + 10% 0.0500 GL/MT² 1,375.00 1,165.25 209.75 58.26 10.49 68.75
Manto asfartico e= 4mm+10% 1.1000 MT² 501.87 425.31 76.56 467.84 84.21 552.06
Pintura de aluminio 0.0500 GL/MT² 1,100.00 932.20 167.80 46.61 8.39 55.00
Aplicación impermeabilizante 1.0000 MT² 26.71 26.71 0.00 26.71
COSTO/MT² 599.43 103.09 702.52

4.203 Zabaleta En Techo (1Er Nivel)

Mortero 1:3-A 0.0100 m3 #REF! #REF! #REF! #REF! #REF! #REF!


Mano de Obra 1.0000 ml 87.58 87.58 0.00 87.58
Herramientas (2%) 0.0200 P.A. #REF! #REF! #REF! #REF! #REF! #REF!
COSTO/Ml #REF! #REF! #REF!

4.3 PINTURA

4.301 Pintura De Mantenimiento En Muros Y Columnas (2 Manos)

pintura mantenimiento 0.0800 GLS 1,130.00 957.63 172.37 76.61 13.79 90.40
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 175.40 148.64 26.76 2.97 0.54 3.51
COSTO/MT² 220.42 25.77 246.19

4.302 Pintura Acrilica En Muros Y Columnas (2 Manos)

pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38

5 MODULO IV: COMEDOR

5.1 DESMONTES Y DEMOLICIONES

5.101 Desmonte De Lona Asfaltica (Inc. Bajada De Materiales)

Espatula 0.0300 UD 130.00 110.17 19.83 3.31 0.59 3.90


Cuchilla 0.0300 UD 175.00 148.31 26.69 4.45 0.80 5.25
Mano de obra levantamiento impermeabiliz 1.0000 M2 25.00 25.00 0.00 25.00
Bajada de material 0.0600 M3 260.00 15.60 0.00 15.60
COSTO/MT² 48.35 1.40 49.75
5.102 Demolicion De Fino E=10Cms

Maseta 0.0100 Und 625.00 743.22 133.78 7.43 1.34 8.77


Cinsel 0.0100 Und 225.00 330.51 59.49 3.31 0.59 3.90
Pala 0.0100 Und 775.00 576.27 103.73 5.76 1.04 6.80
Pico 0.0100 Und 1,121.00 737.29 132.71 7.37 1.33 8.70
Martillo 0.0100 Und 240.00 385.59 69.41 3.86 0.69 4.55
Carretilla 3Pie 0.0050 Und 5,500.00 4,000.00 720.00 20.00 3.60 23.60
M.O demolicion fino techo inclinado 1.0000 Mt² 120.00 95.00 0.00 95.00
Traslado material de demolicion de fino tec 0.1500 D/H 95.00 12.00 0.00 12.00
COSTO/MT² 154.73 8.59 163.32
COSTO/MT³ 1,547.29 85.91 1,633.20

5.103 Bote De Material (Inc. Carguio) D=5Km

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73

MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

5.2 TERMINACION DE TECHO

5.201 Fino En Techo (1Er Nivel)

madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0400 m3 6,993.84 5,926.98 1,066.86 237.08 42.67 279.75
fino en techo horiz. sin incl. subida de mater 1.0000 m2 114.27 114.27 0.00 114.27
Herramientas (2%) 1.0000 P.A. 7.91 6.71 1.21 6.71 1.21 7.91
COSTO/MT² 359.43 44.13 403.56

5.202 Imperm. Tela Asfaltica De 4Mm (Granular)

Prime + 10% 0.0500 GL/MT² 1,375.00 1,165.25 209.75 58.26 10.49 68.75
Manto asfartico e= 4mm+10% 1.1000 MT² 501.87 425.31 76.56 467.84 84.21 552.06
Pintura de aluminio 0.0500 GL/MT² 1,100.00 932.20 167.80 46.61 8.39 55.00
Aplicación impermeabilizante 1.0000 MT² 26.71 26.71 0.00 26.71
COSTO/MT² 599.43 103.09 702.52

5.203 Zabaleta En Techo (1Er Nivel)

Mortero 1:3-A 0.0100 m3 #REF! #REF! #REF! #REF! #REF! #REF!


Mano de Obra 1.0000 ml 87.58 87.58 0.00 87.58
Herramientas (2%) 0.0200 P.A. #REF! #REF! #REF! #REF! #REF! #REF!
COSTO/Ml #REF! #REF! #REF!

5.3 PINTURA

5.301 Pintura De Mantenimiento En Muros Y Columnas (2 Manos)

pintura mantenimiento 0.0800 GLS 1,130.00 957.63 172.37 76.61 13.79 90.40
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 175.40 148.64 26.76 2.97 0.54 3.51
COSTO/MT² 220.42 25.77 246.19

5.302 Pintura Acrilica En Muros Y Columnas (2 Manos)

pintura acrílica (POPULAR) 0.0800 GLS 1,500.00 1,271.19 228.81 101.69 18.31 120.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 205.00 173.73 31.27 3.47 0.63 4.10
COSTO/MT² 246.01 30.37 276.38

6 MURO DE CONTENCION L=38.60ML, H=4.00 -6.00MTS

6.001 Demolicion de Verja Perimetral L=43.40mts

6.002 Limpieza y bote de material existente por derrumbe de pared


6.003 Excavacion de zapata (3.50*4.60*3.00)mts

EQUIPOS:
HERRAMIENTAS 2.0000 % M.O. 6.25 0.00 6.25
Sub-Total (1) Equipos 6.25 0.00 6.25

MANO DE OBRA:
Picadores 2.0000 días 572.64 1,145.28 0.00 1,145.28
Paleador 1.0000 días 572.64 572.64 0.00 572.64
1,717.92 0.00 1,717.92
RENDIMIENTO: 5.5000 M3/Dia 312.35 0.00 312.35

Sub-Total (3) Mano de Obra 312.35 312.35

COSTO/MT³ 318.60 0.00 318.60

6.004 Bote De Materiales (Incl. Carguio) D=5Km

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73

MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

6.005 Relleno De Reposicion en zapata (Traslado, Regado Y Compactado)

PALA "TRAMONTINA" 0.0100 UD 775.00 656.78 139.50 7.75 1.40 7.75


PICO "TRAMONTINA" 0.0100 UD 1,121.00 950.00 201.78 11.21 2.02 11.21
Regado, nivelado y apisonado de relleno 1.2000 m3 120.00 144.00 0.00 144.00
Herramientas (2%) 0.0200 P.A. 18.96 16.07 3.41 0.38 0.07 0.38
COSTO/MT³ 163.34 3.48 163.34

6.006 Relleno compactado caliche a nivel de cancha y aula inicial

Alq. Compactador maquito 1.00 M3 10.42 8.83 1.88 10.42 1.88 10.42
Peones ( 3 ) 3.0000 Hr 102.97 308.91 0.00 308.91
Combustible (3 Galones/día) 0.3800 Gls 221.60 187.80 39.89 84.21 15.16 84.21
Lubricante 0.1500 Gls 84.21 71.36 15.16 12.63 2.27 12.63
SUB-TOTAL 416.16
Rendimiento 3.0000 Mt³/Hr 416.16 138.72 138.72
Material granular 1.5000 Mt³ 650.00 975.00 0.00 975.00
Regado y mojado 1.0000 Mt³ 175.00 175.00 175.00
Herramienta 0.0200 % 1,113.72 943.83 169.89 18.88 3.40 22.27
COSTO/MT³ 1,307.60 3.40 1,311.00

6.007 Zapata de muro (3.5*0.75*38.60)mts

6.008 Muro de H.A. (e=0.40m) fc=210kg/cm2


6.009 Lloradero de 4" PVC SDR

VERJA PERIMETRAL EN BLOQUES SOBRE MURO DE CONTENCION

6.010 Columna (0.20X0.20) Mts 4ؽ"

6.011 Viga Bnp 20X15Cms (4Ø3/8"") Est.@0.20Mts

6.012 Viga 15X20Cms (5Ø3/8") Est.@0.20Mts


6.013 Block 6" Acero Vert.@0.60Mts Bnp

Bloques horm. + 4% desp. + itbis 13.0000 u 44.00 37.29 6.71 484.75 87.25 572.00
Mortero 1:3 en juntas + 30% desp. 0.0312 m3 6,993.84 5,926.98 1,066.86 184.92 33.29 218.21
Horm. en cámaras + 10% desp. 0.0200 m3 6,116.15 5,183.18 932.97 103.66 18.66 122.32
Acero 3/8" x 20' grado 40 + 20% desp. 0.0592 qq 3,800.00 3,220.34 579.66 190.64 34.32 224.96
Alambre No. 18 0.0888 LBS 100.00 84.74 15.25 7.53 1.35 8.88
Corte y amarre varilla. 13.0000 u 1.05 13.66 0.00 13.66
Llenado huecos. 13.0000 u 3.15 40.90 0.00 40.90
Coloc. bloques. 13.0000 u 23.53 305.83 0.00 305.83
COSTO/MT² 1,331.89 174.87 1,506.76

6.014 Block 6" Acero Vert.@0.80Mts - Violinado

bloques de 0.15 mts (6") 12.8750 Ud 27.5 23.31 4.19 300.05 54.01 354.06
acero 3/8" x 20' -G40 0.0265 QQ 2,200.00 1,864.41 335.59 49.41 8.89 58.30
alambre dulce #18 0.0640 Lbs 45 38.14 6.86 2.44 0.44 2.88
mezcla 1:3 0.0290 m3 6,993.84 4,591.29 826.43 133.15
Hormigón 140 KG/cms2 (1:3:5) 0.0240 m3 3,955.48 3,352.10 603.38 80.45 14.48 94.93
colocación bloques de 0.15 mts y violinado 13.0000 Ud 16.37 212.81 0.00 212.81
llenado de huecos y violinado ambas caras 13.0000 Ud 1.46 18.98 0.00 18.98
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.46 18.98 0.00 18.98
andamios interiores 1.0000 m2 33.96 28.78 5.18 28.78 5.18 33.96
Herramientas (2%) 0.0200 P.A. 667.29 565.50 101.79 11.31 2.04 13.35
COSTO/MT² 506.90 22.14 529.04

6.015 Careteo Y/O Fraguache En Elementos Estructurales

Escoba 0.0100 U 15.00 12.71 2.29 0.13 0.02 0.15


mezcla 1:6 0.0080 m3 4,712.52 3,993.66 718.86 31.95 5.75 37.70
fraguache con escoba 1.0000 m2 28.41 28.41 0.00 28.41
Andamios 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 37.85 32.08 5.77 0.64 0.12 0.76
COSTO/MT² 80.98 9.46 90.45

6.016 Pañete En Vigas y Cols

madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 187.07 187.07 0.00 187.07
andamios 1.0000 M2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/MT² 352.98 29.86 382.85

6.017 Cantos En Vigas - Losas - Columnas

madera pino americano cepillada 0.2590 P2 111.11 94.16 16.95 24.39 4.39 28.78
mezcla 1:1.5:5 (pañete) 0.0040 m3 7,513.44 6,367.32 1,146.12 25.47 4.58 30.05
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 58.83 49.86 8.97 1.00 0.18 1.18
COSTO/ML 133.19 9.15 142.34

6.018 S/C Puerta Tola Corrediza En Verja

Perfiles 2"x 2" x 20' 4.0000 UD 700.00 593.22 106.78 2,372.88 427.12 2,800.00
Tola lisa 4' x 8' x 3/16" 2.0000 UD 3,650.00 3,093.22 556.78 6,186.44 1,113.56 7,300.00
Electrodos 5.0000 lb 548.00 464.41 83.59 2,322.03 417.97 2,740.00
Oxido Rojo 0.7500 gl 730.00 618.64 111.36 463.98 83.52 547.50
Thinner 0.1400 gl 416.67 353.11 63.56 49.44 8.90 58.33
Pintura esmalte 0.7500 gl 1,120.00 949.15 170.85 711.86 128.14 840.00
Brocha de 2" 2.0000 UD 45.00 38.14 6.86 76.27 13.73 90.00
Segueta 2.0000 UD 45.45 38.52 6.93 77.04 13.87 90.91
Disco de Pulir 2.0000 UD 331.47 280.91 50.56 561.82 101.13 662.95
Ruedas porton 2.0000 UND 18.82 15.95 2.87 31.90 5.74 37.64
Riel puerta corrediza 26.2400 PIE 376.36 318.95 57.41 8,369.31 1,506.48 9,875.78
Dispositivo para rodaje 2.0000 UND 245.00 207.63 37.37 415.25 74.75 490.00
Transporte de materiales 0.3000 PA 1,000.00 300.00 0.00 300.00
Mano de Obra 30% 0.3000 P.A. 25,833.11 7,749.93 0.00 7,749.93
COSTO/UD 29,688.16 3,894.88 33,583.04
COSTO/P² 609.11 79.91 689.02
COSTO/MT² 6,553.68 859.80 7,413.47

6.019 Pintura Acrilica Base (1 Mano)

Primer de base (1 manos) 0.1100 GLS 600.00 508.47 91.53 55.93 10.07 66.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 1.85 1.57 0.28 0.03 0.01 0.04
COSTO/M2 191.41

6.020 Pintura Acrilica En Vigas Y Columnas (2 Manos)

pintura acrílica (POPULAR) 0.0800 GLS 725.00 614.41 110.59 49.15 8.85 58.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 133.20 112.88 20.32 2.26 0.41 2.66
COSTO/MT² 192.25 20.69 212.94

6.021 S/C Alambre Trinchera Galvanizado


Alambre Trinchera
B14(R8ml>rendim.8.0ml) 1.0000 ML 200.00 169.49 30.51 169.49 30.51 200.00
Tubo 1½ * 15 p/mc 0.1000 und 436.00 369.49 66.51 36.95 6.65 43.60
Alambre Amarre ( Alambre Trinchera ) 1.0000 p.a 40.00 33.90 6.10 33.90 6.10 40.00
Palometas Dobles 1.0000 und 152.15 128.94 23.21 128.94 23.21 152.15
M.O. Instalacion Alambre Trinchera 1.0000 m.l 130.00 130.00 0.00 130.00
COSTO/ML 499.28 66.47 565.75

6.022 S/C Palometas Doble (Hierro Fundido)

7 ACTIVIDAD FINAL

7.001 Limpieza Final

ANALISIS VARIOS

Excavacion tierra mano

EQUIPOS:
HERRAMIENTAS 2.0000 % M.O. 8.99 0.00 8.99
Sub-Total (1) Equipos 8.99 0.00 8.99

MANO DE OBRA:
Picadores 2.0000 días 823.75 1,647.50 0.00 1,647.50
Paleador 1.0000 días 823.75 823.75 0.00 823.75
2,471.25 0.00 2,471.25
RENDIMIENTO: 5.5000 M3/Dia 449.32 0.00 449.32

Sub-Total (3) Mano de Obra 449.32 449.32

COSTO/MT³ 458.30 0.00 458.30


PERSONAL POR LA CASA PARA VACIADOS(REND. 30.00 M3)

Capataz 0.5000 h/d 2,471.25 1,235.63 0.00 1,235.63


Albañil de 2da. Cat. 1.0000 h/d 1,568.75 1,568.75 0.00 1,568.75
Ayudante albañil 1.1000 h/d 1,058.75 1,164.63 0.00 1,164.63
Obreros 4.0000 h/d 823.75 3,295.00 0.00 3,295.00
RD$/total 7,264.00
RD$/M3 242.13

HASTA AQUÍ MALAQUIAS GIL

PRELIMINARES

Caseta de Materiales de Techada de Zinc (7x 7)

Plywood 3/4 ( 2 usos) 84.0000 m2 674.63 571.72 102.91 48,024.31 8,644.38 56,668.69
Clavos de Zinc 18.0000 LBS 120.00 101.69 18.31 1,830.51 329.49 2,160.00
Madera Pino Americano Bruta (4 usos) 28.0000 P2 125.00 105.93 19.07 2,966.10 533.90 3,500.00
Zinc Calibre 34 (3 x 6) 2 usos 32.0000 PLANCHA 355.10 300.93 54.17 9,629.83 1,733.37 11,363.20
Puerta (0.90 x 2.10 mts.) y Marco 1.0000 UD 5,462.96 4,629.63 833.33 4,629.63 833.33 5,462.96
Albañil de Segunda Categoria 3.0000 Día 1,568.75 4,706.25 0.00 4,706.25
Carpintero de Segunda Categoria 3.0000 Día 1,568.75 4,706.25 0.00 4,706.25
Trabajador No calificado (TNC) 3.0000 Día 823.75 2,471.25 0.00 2,471.25
Herramientas (2%) 0.0200 P.A. 79,154.85 67,080.38 12,074.47 1,341.61 241.49 1,583.10
COSTO/UD 92,621.70
COSTO/M2 1,890.24

Replanteo

Cal (50 LBS) 5.0000 FDA 260.00 220.34 39.66 1,101.69 198.31 1,300.00
Clavos Corrientes 20.0000 LBS 60.00 50.85 9.15 1,016.95 183.05 1,200.00
Madera Pino Americano Bruta (3 usos) 66.6667 P2 125.00 105.93 19.07 7,062.15 1,271.19 8,333.33
Clavos Acero 5.0000 LBS 55.10 46.69 8.41 233.47 42.03 275.50
Hilo de nylon 5.0000 LBS 168.30 142.63 25.67 713.14 128.36 841.50
Herramienta de Trabajo a mano 1.0000 PA 1,500.00 1,271.19 228.81 1,271.19 228.81 1,500.00
Maestro de Carpinteria 3.0000 Día 2,471.25 7,413.75 0.00 7,413.75
Maestro de Albañileria 3.0000 Día 2,471.25 7,413.75 0.00 7,413.75
Brigada Reducida Topografia 10.0000 Día 3,500.00 35,000.00 0.00 35,000.00
Estacion total 1.0000 Día 10,000.00 10,000.00 0.00 10,000.00
Carpintero de Segunda Categoria 3.0000 Día 1,568.75 4,706.25 0.00 4,706.25
Trabajador No calificado (TNC) 3.0000 Día 823.75 2,471.25 0.00 2,471.25
COSTO/UD 80,455.33
COSTO/m2 280.31

MOVIMIENTO DE TIERRA

CORTE MATERIAL INSERVIBLE CON EQUIPO

RETRO EXC, 225 CAT


COSTO/M3N = 70.91
REND = 35 M3/H
CARGIO 950 CAT
COSTO/M3N = 75.00
REND = 95 M3/H

ARRANQUE COSTO/M3N = 6.24

COSTO TOTAL /M3N 152.15


EXCAVACION ROCA CALIZA CON RETRO EXCAVADORA

COSTO RIPPER
COSTO/M3N = 285.29
REND = 8 M3/H
EXTRACCION CON retro catT320 B
COSTO/M3N = 700.00
REND =8M3/H
CARGIO retro CAT320 B
COSTO/M3N =$ 69.05
REND = 70M3/H
coef. Esponj.= 50%
ARRANQUE COSTO/M3N =$ 27.44

COSTO/M3N 1,081.77

EXCAVACION ROCA BLANDA A MANO


EQUIPOS:

HERRAMIENTAS 0.0500 MO 568.75


Sub-Total (1) Equipos 568.75

MATERIALES:
Sub-Total (2) Materiales
MANO DE OBRA:
Peones 5.0000 Hr. 823.75 4,118.75
Capataz 1.0000 Hr. 1,568.75 1,568.75

RENDIMIENTO: 0.5000 M3/Hr. 5,687.50

Sub-Total (3) Mano de Obra 11,375.00

Costo Total M3n 11,943.75

EXCAVACION EN ROCA CON EQUIPO (COMPRESOR)

COMPRESOR DE DOS PISTOLAS


Alquiler equipo mas pistola =US$151.20/dia /8 hora*RD$ 36.10/us$= 708.75
Operador pistola= $882.00/dia/8horas/dia x 2 personas= 191.70
Ayudante = 476/dia /8 horas/dia x2 personas*1.17= 103.50
Sereno = 370.00/hora*1.17 321.60
Combustible=0.80 gls/h x $135.50/gls x 1.10 x 2 pistolas= 236.72
Amolador, material, piedra, etc.=$3.00/h x 2 pistolas 6.00
COSTO/ HORA/PISTOLA 1,568.27
REND = 0.45M3/H/PISTOLA
REND 2 pistolas= 0.9M3/H
COSTO/M3= 1,742.52

RELLENO DE CALICHE EN CAPAS DE 25 CM DE ESPESOR . INCLUYE; MATERIAL, MANO DE OBRA, EQUIPOS Y HERRAMIENTA.
MANO DE OBRA:
Brigada
Capataz 1.0000 Hr 1,568.75 1,568.75
Peones ( 2 ) 2.0000 Hr 823.75 1,647.50
Traslado de Material del Lugar de Acopio 0.3000 Día 823.75 247.13
Agua 15.2200 Gls 1.00 15.22
Sub-Total 3,478.60

Rendimiento = 2.25 M3/Hr.


SUB-TOTAL MANO DE OBRA: 181.19

EQUIPOS
Compactador manual 1.0000 hr 259.00 259.00
RENDIMIENTO 3.0000 m3/hr
Herramientas 10.0000 % M.O. 18.12
277.12
Sub-Total Equipos 92.37

SUMINISTRO DE MATERIAL
Caliche (20% esponjamiento) 1.1000 m3 125.00 137.50
Transporte 1.0000 m3 503.55 503.55
Sub-total Material 641.05

Costo / M3C 914.62

BOTE CON CARGUIO MANUAL

EQUIPOS:
Camión 6 m3 1.0000 Viaje 1,700.00 1,700.00

RENDIMIENTO: 6.0000 M3/Viaje 283.33


HERRAMIENTAS 0.0500 MO 1.72

Sub-Total (1) Compactación Equipos 285.05

MANO DE OBRA:
Peones 2.0000 H/H 102.97 205.94
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 34.32

Costo/M3 319.37
Bote de material (Incl. carguío) D=5km

EQUIPOS:
Camión 6 m3 1.0000 Viaje 6,000.00 6,000.00 6,000.00

RENDIMIENTO: 6.0000 M3/Viaje 1,000.00 1,000.00


HERRAMIENTAS 0.0500 MO 274.58 232.70 41.89 11.63 2.09 13.73

Sub-Total (1) Compactación Equipos 1,011.63 1,013.73

MANO DE OBRA:
Peones 2.0000 H/H 823.75 1,647.50 0.00 1,647.50
RENDIMIENTO: 6.0000 M3/Viaje

Sub-Total (3) Mano de Obra 274.58 274.58

COSTO/MT³ 1,286.22 2.09 1,288.31

BOTE DE A 15 KM CON CARGUIO MECANICO

ARRANQUE COSTO/M3e =$5.20 5.20

TRANSPORTE 235.50
COSTO/M3/E 5.20

Relleno de tierra compensado y/o de Reposición

PALA "TRAMONTINA" 0.0100 UD 775.00 656.78 139.50 7.75 1.40 7.75


PICO "TRAMONTINA" 0.0100 UD 1,121.00 950.00 201.78 11.21 2.02 11.21
Regado, nivelado y apisonado de relleno 1.2000 m3 120.00 144.00 0.00 144.00
Herramientas (2%) 0.0200 P.A. 18.96 16.07 3.41 0.38 0.07 0.38
COSTO/MT³ 163.34 3.48 163.34

Asiento de arena

PALA "TRAMONTINA" 0.0100 UD 775.00 656.78 118.22 6.57 1.18 7.75


PICO "TRAMONTINA" 0.0100 UD 1,121.00 950.00 171.00 9.50 1.71 11.21
regado, nivelado y apisonado de relleno 1.2000 m3 120.00 144.00 0.00 144.00
arena gruesa ITABO (de mina) 1.0000 m3 1,200.00 1,016.95 183.05 1,016.95 183.05 1,200.00
Herramientas (2%) 0.0200 P.A. 18.96 16.07 2.89 0.32 0.06 0.38
COSTO/M3 1,020.00

DEMOLICION DE MUROS CON RETRO:


RETRO EXC, 225 CAT
RETRO EXC, 225 CAT
COSTO/M3N = 252.84
REND = 16 M3/H
CARGIO 930 cat
COSTO/M3E = 98.73
REND = 40 M3/H
ARRANQUE COSTO/M3N = 27.44

COSTO$/M3N 379.01

DEMOLICION DE HA CON RETRO:

RETRO EXC, 225 CAT


RETRO EXC, 225 CAT
COSTO/M3N = 809.10
REND = 5 M3/H
CARGIO 930 cat
COSTO/M3E = 197.46
REND = 20 M3/H

ARRANQUE COSTO/M3N = 27.44

COSTO$/M3N 1,034.00

MUROS DE BLOQUES

Muros block 0.20 mts s/cruce 0 3/8" A 0.20 mts BNP

bloques de 0.20 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 57.00 48.31 8.69 621.93 111.95 733.88
acero 1/2" x 20' -G40 0.0850 QQ 3,800.00 3,220.34 579.66 273.73 49.27 323.00
alambre dulce #18 0.1700 Lbs 100.00 84.74 15.25 14.41 2.59 17.00
mezcla 1:3 0.0390 m3 6,993.84 5,926.98 1,066.86 231.15 41.61 272.76
Hormigón 140 KG/cms2 (1:3:5) 0.0890 m3 6,116.15 5,183.18 932.97 461.30 83.03 544.34
colocación bloques de 0.20 mts 13.0000 Ud 26.14 339.81 0.00 339.81
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.20 mts 13.0000 Ud 3.15 40.90 0.00 40.90
Herramientas (2%) 0.0200 P.A. 1,890.97 1,602.52 288.45 32.05 5.77 37.82
COSTO/M2 2,411.44

Muros block 0.20 mts s/cruce 0 3/8" A 0.20 mts primer nivel

bloques de 0.20 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 57.00 48.31 8.69 621.93 111.95 733.88
acero 1/2" x 20' -G40 0.0850 QQ 3,800.00 3,220.34 579.66 273.73 49.27 323.00
alambre dulce #18 0.1700 Lbs 100.00 84.74 15.25 14.41 2.59 17.00
mezcla 1:3 0.0390 m3 6,993.84 5,926.98 1,066.86 231.15 41.61 272.76
Hormigón 140 KG/cms2 (1:3:5) 0.0890 m3 6,116.15 5,183.18 932.97 461.30 83.03 544.34
colocación bloques de 0.20 mts 13.0000 Ud 26.14 339.81 0.00 339.81
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.20 mts 13.0000 Ud 3.15 40.90 0.00 40.90
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 1,890.97 1,602.52 288.45 32.05 5.77 37.82
COSTO/M2 2,434.87

Muros block 0.20 mts s/cruce 0 3/8" A 0.80 mts B.N.P.

bloques de 0.20 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 57.00 48.31 8.69 621.93 111.95 733.88
acero 3/8" x 20' -G40 0.0210 QQ 3,800.00 3,220.34 579.66 67.63 12.17 79.80
alambre dulce #18 0.0420 Lbs 100.00 84.74 15.25 3.56 0.64 4.20
mezcla 1:3 0.0390 m3 6,993.84 5,926.98 1,066.86 231.15 41.61 272.76
Hormigón 140 KG/cms2 (1:3:5) 0.0220 m3 6,116.15 5,183.18 932.97 114.03 20.53 134.56
colocación bloques de 0.20 mts 13.0000 Ud 26.14 339.81 0.00 339.81
llenado de huecos A 0.80 mts 13.0000 Ud 2.10 27.33 0.00 27.33
corte y amarre de acero A 0.80 mts 13.0000 Ud 1.05 13.66 0.00 13.66
Herramientas (2%) 0.0200 P.A. 1,225.19 1,038.30 186.89 20.77 3.74 24.50
COSTO/M2 1,630.49

Muros block 0.20 mts s/cruce 0 3/8" A 0.80 mts 1er. Nivel

bloques de 0.20 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 57.00 48.31 8.69 621.93 111.95 733.88
acero 3/8" x 20' -G40 0.0210 QQ 3,800.00 3,220.34 579.66 67.63 12.17 79.80
alambre dulce #18 0.0420 Lbs 100.00 84.74 15.25 3.56 0.64 4.20
mezcla 1:3 0.0390 m3 6,993.84 5,926.98 1,066.86 231.15 41.61 272.76
Hormigón 140 KG/cms2 (1:3:5) 0.0290 m3 6,116.15 5,183.18 932.97 150.31 27.06 177.37
colocación bloques de 0.20 mts 13.0000 Ud 26.14 339.81 0.00 339.81
llenado de huecos A 0.80 mts 13.0000 Ud 2.10 27.33 0.00 27.33
corte y amarre de acero A 0.80 mts 13.0000 Ud 1.05 13.66 0.00 13.66
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 1,268.00 1,074.58 193.42 21.49 3.87 25.36
COSTO/M2 1,697.60

Muros block 0.20 mts s/cruce 0 3/8" A 0.60 mts B.N.P.

bloques de 0.20 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 57.00 48.31 8.69 621.93 111.95 733.88
acero 3/8" x 20' -G40 0.0300 QQ 3,800.00 3,220.34 579.66 96.61 17.39 114.00
alambre dulce #18 0.0600 Lbs 100.00 84.74 15.25 5.08 0.92 6.00
mezcla 1:3 0.0400 m3 6,993.84 5,926.98 1,066.86 237.08 42.67 279.75
Hormigón 140 KG/cms2 (1:3:5) 0.0370 m3 6,116.15 5,183.18 932.97 191.78 34.52 226.30
colocación bloques de 0.20 mts 13.0000 Ud 26.14 339.81 0.00 339.81
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 20.52 0.00 20.52
Herramientas (2%) 0.0200 P.A. 1,359.93 1,152.48 207.45 23.05 4.15 27.20
COSTO/M2 1,788.35

Muros block 0.20 mts s/cruce 0 3/8" A 0.60 mts 1er. Nivel

bloques de 0.20 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 57.00 48.31 8.69 621.93 111.95 733.88
acero 3/8" x 20' -G40 0.0300 QQ 3,800.00 3,220.34 579.66 96.61 17.39 114.00
alambre dulce #18 0.0600 Lbs 100.00 84.74 15.25 5.08 0.92 6.00
mezcla 1:3 0.0400 m3 6,993.84 5,926.98 1,066.86 237.08 42.67 279.75
Hormigón 140 KG/cms2 (1:3:5) 0.0370 m3 6,116.15 5,183.18 932.97 191.78 34.52 226.30
colocación bloques de 0.20 mts 13.0000 Ud 26.14 339.81 0.00 339.81
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 20.52 0.00 20.52
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 1,359.93 1,152.48 207.45 23.05 4.15 27.20
COSTO/M2 1,811.79

Muros block 0.25 mts s/cruce 0 3/8" A 0.60 mts 1er. Nivel

bloques de 0.25 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 90.00 76.27 13.73 981.99 176.76 1,158.75
acero 3/8" x 20' -G40 0.0300 QQ 3,800.00 3,220.34 579.66 96.61 17.39 114.00
alambre dulce #18 0.0600 Lbs 100.00 84.74 15.25 5.08 0.92 6.00
mezcla 1:3 0.0050 m3 6,993.84 5,926.98 1,066.86 29.63 5.33 34.97
Hormigón 140 KG/cms2 (1:3:5) 0.0425 m3 6,116.15 5,183.18 932.97 220.29 39.65 259.94
colocación bloques de 0.25 mts 13.0000 Ud 48.36 628.69 0.00 628.69
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 20.52 0.00 20.52
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 1,573.66 1,333.61 240.05 26.67 4.80 31.47
COSTO/M2 2,318.68

Muros block 0.20M c/cruce 0 3/8" A 0.40 y C. LL. (BNP)

bloques de 0.20 mts (8") TAVAREZ INDUSTRI 12.8750 Ud 57.00 48.31 8.69 621.93 111.95 733.88
acero 3/8" x 20' -G40 0.0500 QQ 3,800.00 3,220.34 579.66 161.02 28.98 190.00
alambre dulce #18 0.1000 Lbs 100.00 84.74 15.25 8.47 1.53 10.00
mezcla 1:3 0.0390 m3 6,993.84 5,926.98 1,066.86 231.15 41.61 272.76
Hormigón 140 KG/cms2 (1:3:5) 0.0900 m3 6,116.15 5,183.18 932.97 466.49 83.97 550.45
colocación bloques de 0.20 mts 13.0000 Ud 26.14 339.81 0.00 339.81
llenado de huecos A 0.40 mts 13.0000 Ud 4.22 54.89 0.00 54.89
corte y amarre de acero A 0.40 mts 13.0000 Ud 2.10 27.33 0.00 27.33
Herramientas (2%) 0.0200 P.A. 1,757.09 1,489.06 268.03 29.78 5.36 35.14
COSTO/M2 2,214.25

Muros block 0.15 M s/cruce 0 3/8" A 0.80mts B.N.P.


bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
Acero 3/8" -G40 0.0290 QQ 3,800.00 3,220.34 579.66 93.39 16.81 110.20
Alambre Dulce #18 0.0580 Lbs 100.00 84.74 15.25 4.92 0.88 5.80
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 KG/cms2 (1:3:5) 0.0190 m3 6,116.15 5,183.18 932.97 98.48 17.73 116.21
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.80 mts 13.0000 Ud 2.10 27.33 0.00 27.33
corte y amarre de acero A 0.80 mts 13.0000 Ud 1.05 13.66 0.00 13.66
Herramientas (2%) 0.0200 P.A. 1,001.53 848.75 152.78 16.98 3.06 20.03
COSTO/M2 1,368.38

Muros block 0.15 M s/cruce 0 3/8" A 0.60mts B.N.P.

bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 3/8" x 20' -G40 0.0320 QQ 3,800.00 3,220.34 579.66 103.05 18.55 121.60
alambre dulce #18 0.0640 Lbs 100.00 84.74 15.25 5.42 0.98 6.40
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 KG/cms2 (1:3:5) 0.0240 m3 6,116.15 5,183.18 932.97 124.40 22.39 146.79
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 20.52 0.00 20.52
Herramientas (2%) 0.0200 P.A. 694.50 588.56 105.94 11.77 2.12 13.89
COSTO/M2 1,425.25

Muros block 0.15 M s/cruce 0 3/8" A 0.80mts 1er. Nivel

bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 1/2" x 20' -G40 0.0380 QQ 3,800.00 3,220.34 579.66 122.37 22.03 144.40
alambre dulce #18 0.0760 Lbs 100.00 84.74 15.25 6.44 1.16 7.60
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 KG/cms2 (1:3:5) 0.0190 m3 6,116.15 5,183.18 932.97 98.48 17.73 116.21
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.80 mts 13.0000 Ud 2.10 27.33 0.00 27.33
corte y amarre de acero A 0.80 mts 13.0000 Ud 1.05 13.66 0.00 13.66
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 718.50 608.90 109.60 12.18 2.19 14.37
COSTO/M2 1,422.15

Muros block 0.15 M s/cruce 0 3/8" A 0.60mts primer nivel

bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 3/8" x 20' -G40 0.0320 QQ 3,800.00 3,220.34 579.66 103.05 18.55 121.60
alambre dulce #18 0.0640 Lbs 100.00 84.74 15.25 5.42 0.98 6.40
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 KG/cms2 (1:3:5) 0.0240 m3 6,116.15 5,183.18 932.97 124.40 22.39 146.79
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 20.52 0.00 20.52
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 694.50 588.56 105.94 11.77 2.12 13.89
COSTO/M2 1,448.68

Muros block 0.15 M s/cruce 0 3/8" A 0.40 M y C. LL. (BNP)

bloques de 0.15 mts (6") TAVARES INDUSTRI 12.8750 Ud 44.00 37.29 6.71 480.08 86.42 566.50
acero 3/8" x 20' -G40 0.0420 QQ 3,800.00 3,220.34 579.66 135.25 24.35 159.60
alambre dulce #18 0.0840 Lbs 100.00 84.74 15.25 7.12 1.28 8.40
mezcla 1:3 0.0290 m3 6,993.84 5,926.98 1,066.86 171.88 30.94 202.82
Hormigón 140 Kg/cms2 (1:3:5) 0.0590 m3 6,116.15 5,183.18 932.97 305.81 55.05 360.85
colocación bloques de 0.15 mts 13.0000 Ud 23.53 305.83 0.00 305.83
llenado de huecos A 0.20 mts 13.0000 Ud 7.84 101.94 0.00 101.94
corte y amarre de acero A 0.40 mts 13.0000 Ud 2.10 1.78 0.32 23.16 4.17 27.33
Herramientas (2%) 0.0200 P.A. 734.50 622.46 112.04 12.45 2.24 14.69
COSTO/M2 1,747.95

muros block 0.10 mts sin CRUCE 0 3/8" A 0.80 mts BNP

bloques de 0.10 mts (4") TAVARES INDUSTRI 12.8750 Ud 25.00 21.19 3.81 272.78 49.10 321.88
acero 3/8" x 20' -G40 0.0230 QQ 3,800.00 3,220.34 579.66 74.07 13.33 87.40
alambre dulce #18 0.0460 Lbs 100.00 84.74 15.25 3.90 0.70 4.60
mezcla 1:3 0.0300 m3 6,993.84 5,926.98 1,066.86 177.81 32.01 209.82
Hormigón 140 KG/cms2 (1:3:5) 0.0070 m3 6,116.15 5,183.18 932.97 36.28 6.53 42.81
colocación bloques de 0.10 mts. 13.0000 Ud 28.23 366.99 0.00 366.99
llenado de huecos A 0.80 mts 13.0000 Ud 2.10 27.33 0.00 27.33
corte y amarre de acero A 0.80 mts 13.0000 Ud 1.05 13.66 0.00 13.66
Herramientas (2%) 0.0200 P.A. 413.87 350.74 63.13 7.01 1.26 8.28
COSTO/M2 1,082.76

muros block 0.10 mts sin CRUCE 0 3/8" A 0.80 mts 1er. Nivel

bloques de 0.10 mts (4") TAVARES INDUSTRI 12.8750 Ud 25.00 21.19 3.81 272.78 49.10 321.88
acero 3/8" x 20' -G40 0.0230 QQ 3,800.00 3,220.34 579.66 74.07 13.33 87.40
alambre dulce #18 0.0460 Lbs 100.00 84.74 15.25 3.90 0.70 4.60
mezcla 1:3 0.0300 m3 6,993.84 5,926.98 1,066.86 177.81 32.01 209.82
Hormigón 140 KG/cms2 (1:3:5) 0.0070 m3 6,116.15 5,183.18 932.97 36.28 6.53 42.81
colocación bloques de 0.10 mts. 13.0000 Ud 28.23 366.99 0.00 366.99
llenado de huecos A 0.80 mts 13.0000 Ud 2.10 27.33 0.00 27.33
corte y amarre de acero A 0.80 mts 13.0000 Ud 1.05 13.66 0.00 13.66
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 413.87 350.74 63.13 7.01 1.26 8.28
COSTO/M2 1,106.20

muros block 0.10 mts sin CRUCE 0 3/8" A 0.60 mts BNP
bloques de 0.10 mts (4") TAVARES INDUSTRI 12.8750 Ud 25.00 21.19 3.81 272.78 49.10 321.88
acero 3/8" x 20' -G40 0.0300 QQ 3,800.00 3,220.34 579.66 96.61 17.39 114.00
alambre dulce #18 0.0600 Lbs 100.00 84.74 15.25 5.08 0.92 6.00
mezcla 1:3 0.0400 m3 6,993.84 5,926.98 1,066.86 237.08 42.67 279.75
Hormigón 140 KG/cms2 (1:3:5) 0.0300 m3 6,116.15 5,183.18 932.97 155.50 27.99 183.48
colocación bloques de 0.10 mts. 13.0000 Ud 28.23 366.99 0.00 366.99
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 20.52 0.00 20.52
Herramientas (2%) 0.0200 P.A. 441.87 374.47 67.40 7.49 1.35 8.84
COSTO/M2 1,342.36

muros block 0.10 mts sin CRUCE 0 3/8" A 0.60 mts 1er. Nivel

bloques de 0.10 mts (4") TAVARES INDUSTRI 12.8750 Ud 25.00 21.19 3.81 272.78 49.10 321.88
acero 3/8" x 20' -G40 0.0300 QQ 3,800.00 3,220.34 579.66 96.61 17.39 114.00
alambre dulce #18 0.0600 Lbs 100.00 84.74 15.25 5.08 0.92 6.00
mezcla 1:3 0.0400 m3 6,993.84 5,926.98 1,066.86 237.08 42.67 279.75
Hormigón 140 KG/cms2 (1:3:5) 0.0300 m3 6,116.15 5,183.18 932.97 155.50 27.99 183.48
colocación bloques de 0.10 mts. 13.0000 Ud 28.23 366.99 0.00 366.99
llenado de huecos A 0.60 mts 13.0000 Ud 3.15 40.90 0.00 40.90
corte y amarre de acero A 0.60 mts 13.0000 Ud 1.58 20.52 0.00 20.52
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 441.87 374.47 67.40 7.49 1.35 8.84
COSTO/M2 1,365.80

TERMINACION DE SUPERFICIE

Pañete en muros y H.A.

madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 187.07 187.07 0.00 187.07
andamios 1.0000 M2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/M2 382.85

Pañete en Techos

madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 242.13 242.13 0.00 242.13
andamios 1.0000 M2 34.68 29.39 5.29 29.39 5.29 34.68
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/M2 449.14

Pañete en muros y H.A. con arena gruesa

madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,786.44 6,598.68 1,187.76 145.17 26.13 171.30
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 187.07 187.07 0.00 187.07
andamios 1.0000 M2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 174.97 148.28 26.69 2.97 0.53 3.50
COSTO/M2 388.97

Cantos

madera pino americano cepillada 0.2590 P2 111.11 94.16 16.95 24.39 4.39 28.78
mezcla 1:1.5:5 (pañete) 0.0040 m3 7,513.44 6,367.32 1,146.12 25.47 4.58 30.05
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 58.83 49.86 8.97 1.00 0.18 1.18
COSTO/ML 142.34

Careteo con llana sobre superficies de Hormigón

mezcla 1:3 0.0130 m3 6,993.84 5,926.98 1,066.86 77.05 13.87 90.92


careteo con llana 1.0000 m2 44.91 44.91 0.00 44.91
andamios para pañete en techos 1.0000 m2 34.68 29.39 5.29 29.39 5.29 34.68
Herramientas (2%) 0.0200 P.A. 135.83 115.11 20.72 2.30 0.41 2.72
COSTO/M2 173.22

Fraguache en Muros Y Techos

Escoba 0.0100 U 15.00 12.71 2.29 0.13 0.02 0.15


mezcla 1:6 0.0080 m3 4,712.52 3,993.66 718.86 31.95 5.75 37.70
fraguache con escoba 1.0000 m2 28.41 28.41 0.00 28.41
Andamios 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 37.85 32.08 5.77 0.64 0.12 0.76
COSTO/M2 90.45

Estrias y Ranuras Especiales en Exteriores

madera pino americano cepillada 0.2733 P2 111.11 94.16 16.95 25.73 4.63 30.37
clavos acero 0.0137 LBS 55.10 46.69 8.41 0.64 0.12 0.75
mezcla 1:1.5:5 (pañete) 0.0065 m3 7,513.44 6,367.32 1,146.12 41.07 7.39 48.46
estrías 1.0000 ml 164.67 164.67 0.00 164.67
Herramientas (2%) 0.0200 P.A. 79.58 67.44 12.14 1.35 0.24 1.59
COSTO/ML 245.84
Pañete en muros piscina

madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
Pool Cote 1.0000 M2 650.00 550.85 99.15 550.85 99.15 650.00
Mano de Obra pañete 1.0000 M2 238.09 238.09 0.00 238.09
Limpieza especial muros con acido muriatic 1.0000 M2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 653.67 553.95 99.71 11.08 1.99 13.07
COSTO/M2 914.83

Fino en fondo piscina con hidrofugo para piscina

madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0500 m3 6,993.84 5,926.98 1,066.86 296.35 53.34 349.69
Cal hidratada 0.1380 fda 260.00 220.34 39.66 30.41 5.47 35.88
Sxpel 0.0460 m3 267.12 226.37 40.75 10.41 1.87 12.29
fino en techo horiz. sin incl. subida de mater 1.0000 m2 16.00 16.00 0.00 16.00
Herramientas (2%) 0.0200 P.A. 387.20 328.13 59.06 6.56 1.18 7.74
COSTO/M2 423.23

Alto Relieve en ventanas en hormigon

madera pino americano cepillada para mol 1.0000 P2 111.11 94.16 16.95 94.16 16.95 111.11
mezcla 1:1.5:5 (pañete) 0.0100 m3 7,513.44 6,367.32 1,146.12 63.67 11.46 75.13
MO alto relieve 1.0000 ml 7.50 7.50 0.00 7.50
Herramientas (2%) 0.0200 P.A. 186.24 157.83 28.41 3.16 0.57 3.72
COSTO/ML 197.47

ANDAMIOS

Andamios Interiores

Madera Pino Americano Bruta 0.1820 P2 125.00 105.93 19.07 19.28 3.47 22.75
Colocación Andamio Interior 1.0000 m2 0.23 0.23 0.00 0.23
Herramientas (2%) 0.0200 P.A. 22.75 19.28 3.47 0.39 0.07 0.46
COSTO/M2 23.44

Andamios en techos

Plywood 3/4" (Dos Caras) 0.0083 Plancha 4,000.00 3,389.83 610.17 28.24 5.08 33.32
Colocación Andamio 1.0000 m2 0.69 0.69 0.00 0.69
Herramientas (2%) 0.0200 P.A. 33.32 28.24 5.08 0.56 0.10 0.67
COSTO/M2 34.68

Andamios Exteriores

Madera Pino Americano Bruta 1.0600 P2 125.00 105.93 19.07 112.29 20.21 132.50
Clavos Corrientes Con Cabeza 2" En Adelant 0.2410 lbs 60.00 50.85 9.15 12.25 2.21 14.46
Clavos Acero 0.1330 lbs 55.10 46.69 8.41 6.21 1.12 7.33
Confección E Instalación De Andamios Exter 6.5200 p2 30.00 195.60 0.00 195.60
COSTO/M2 349.89

TERMINACION DE PISOS

Porcelantato en áreas generales

derretido cemento blanco (100 LBS) 0.0333 Fds 1,500.00 1,271.19 228.81 42.33 7.62 49.95
Porcelanato 1.1000 M2 800.00 677.97 122.03 745.76 134.24 880.00
ESTOPA 0.0500 LB 125.00 105.93 19.07 5.30 0.95 6.25
mezcla 1:4 0.0500 M3 5,912.96 5,010.98 901.98 250.55 45.10 295.65
Pegamento Especial para Ceramica 0.1667 fda 522.00 442.37 79.63 73.73 13.27 87.00
MO piso de CERAMICA 1.0000 M2 477.58 477.58 0.00 477.58
corte de losetas de CERAMICA 3.0000 UD 5.00 15.00 0.00 15.00
Herramientas (2%) 0.0200 P.A. 1,318.85 1,117.67 201.18 22.35 4.02 26.38
COSTO/M2 1,837.81

Porcelanato Gres antideslizante

derretido cemento blanco (100 LBS) 0.0333 Fds 1,500.00 1,271.19 228.81 42.33 7.62 49.95
Porcelanato 1.1000 M2 989.99 838.97 151.02 922.87 166.12 1,088.99
ESTOPA 0.0500 LB 125.00 105.93 19.07 5.30 0.95 6.25
mezcla 1:4 0.0500 M3 5,912.96 5,010.98 901.98 250.55 45.10 295.65
Pegamento Especial para Ceramica 0.1667 fda 522.00 442.37 79.63 73.73 13.27 87.00
MO piso de CERAMICA 1.0000 M2 477.58 477.58 0.00 477.58
corte de losetas de CERAMICA 3.0000 UD 5.00 15.00 0.00 15.00
Herramientas (2%) 0.0200 P.A. 1,527.84 1,294.78 233.06 25.90 4.66 30.56
COSTO/M2 2,050.98

Piso Ceramica en servicios, lavados, area de personal

derretido cemento blanco (100 LBS) 0.0333 Fds 1,500.00 1,271.19 228.81 42.33 7.62 49.95
Ceramica 1.1000 M2 500.00 423.73 76.27 466.10 83.90 550.00
ESTOPA 0.0500 LB 125.00 105.93 19.07 5.30 0.95 6.25
mezcla 1:4 0.0500 M3 5,912.96 5,010.98 901.98 250.55 45.10 295.65
Pegamento Especial para Ceramica 0.1667 fda 522.00 442.37 79.63 73.73 13.27 87.00
MO piso de CERAMICA 1.0000 M2 477.58 477.58 0.00 477.58
corte de losetas de CERAMICA 3.0000 UD 5.00 15.00 0.00 15.00
Herramientas (2%) 0.0200 P.A. 988.85 838.01 150.84 16.76 3.02 19.78
COSTO/M2 1,501.21

Zócalo de porcelanato en areas generales


Zocalo Porcelanato 1.0500 ML 227.27 192.60 34.67 202.23 36.40 238.64
derretido cemento blanco (100 LBS) 0.0110 Fds 1,500.00 1,271.19 228.81 13.98 2.52 16.50
mezcla para natilla 0.0002 M3 9,867.92 8,362.64 1,505.28 1.67 0.30 1.97
Pegamento Especial para Ceramica 0.0117 fda 522.00 442.37 79.63 5.16 0.93 6.09
colocación zócalos 1.0000 ML 108.13 108.13 0.00 108.13
corte de zócalos 1.0000 UD 8.00 8.00 0.00 8.00
Herramientas (2%) 0.0200 P.A. 263.20 223.05 40.15 4.46 0.80 5.26
COSTO/ML 384.60

Zócalo de gres antideslizante

Zocalo Porcelanato 1.0500 ML 150.00 127.12 22.88 133.47 24.03 157.50


derretido cemento blanco (100 LBS) 0.0110 Fds 1,500.00 1,271.19 228.81 13.98 2.52 16.50
mezcla para natilla 0.0002 M3 9,867.92 8,362.64 1,505.28 1.67 0.30 1.97
Pegamento Especial para Ceramica 0.0117 fda 522.00 442.37 79.63 5.16 0.93 6.09
colocación zócalos 1.0000 ML 108.13 108.13 0.00 108.13
corte de zócalos 1.0000 UD 8.00 8.00 0.00 8.00
Herramientas (2%) 0.0200 P.A. 182.06 154.29 27.77 3.09 0.56 3.64
COSTO/ML 301.84

Zócalos de Ceramica en servicios

Zocalo ceramica 1.0500 ML 75.76 64.20 11.56 67.41 12.13 79.55


derretido cemento blanco (100 LBS) 0.0110 Fds 1,500.00 1,271.19 228.81 13.98 2.52 16.50
mezcla para natilla 0.0002 M3 9,867.92 8,362.64 1,505.28 1.67 0.30 1.97
Pegamento Especial para Ceramica 0.0117 fda 522.00 442.37 79.63 5.16 0.93 6.09
colocación zócalos 1.0000 ML 108.13 108.13 0.00 108.13
corte de zócalos 1.0000 UD 8.00 8.00 0.00 8.00
Herramientas (2%) 0.0200 P.A. 104.11 88.23 15.88 1.76 0.32 2.08
COSTO/ML 222.32

Piso de cemento PULIDO

madera pino americano bruta 1.0000 P2 125.00 105.93 19.07 105.93 19.07 125.00
Hormigón 180 KG/cms2 industrial 0.1000 m3 6,852.58 5,807.27 1,045.31 580.73 104.53 685.26
M.O. piso de Hormigon pulido 1.0000 m2 181.35 181.35 0.00 181.35
Herramientas (2%) 0.0200 P.A. 810.26 16.21 0.00 16.21
COSTO/M2 1,007.82
COSTO/M3 10,078.18

Piso de cemento PULIDO en parqueos con malla electrosoldada

madera pino americano bruta 1.0000 P2 125.00 105.93 19.07 105.93 19.07 125.00
Hormigón 180 KG/cms2 industrial 0.1000 m3 6,852.58 5,807.27 1,045.31 580.73 104.53 685.26
malla electro soldada 1.0000 m2 127.65 108.18 19.47 108.18 19.47 127.65
M.O. piso de Hormigon pulido 1.0000 m2 181.35 181.35 0.00 181.35
mano de obra malla 1.0000 m2 92.05 92.05 0.00 92.05
pulido con helicoptero 1.0000 m2 120.00 120.00 0.00 120.00
Herramientas (2%) 0.0200 P.A. 937.91 794.84 143.07 15.90 2.86 18.76
COSTO/M2 1,350.07
COSTO/M3 9,764.70

Piso de granito negro

Mosaico De Granito negro 1.0500 M2 5,824.00 4,935.59 888.41 5,182.37 932.83 6,115.20
Derretido Cemento Blanco (100 LBS) 0.0700 Fds 1,500.00 1,271.19 228.81 88.98 16.02 105.00
Mezcla 1:4 0.0320 m3 5,912.96 5,010.98 901.98 160.35 28.86 189.21
Colocacion Piso De Mosaicos De Granito 1.0000 m2 373.74 373.74 0.00 373.74
Corte De Chazos De 0.30 Mts 3.0000 Ud 25.00 75.00 0.00 75.00
MO derretido pisos 1.0000 m2 15.45 15.45 0.00 15.45
Herramientas (2%) 0.0200 P.A. 6,409.41 5,431.71 977.71 108.63 19.55 128.19
COSTO/M2 7,001.79

Zócalos de Granito negro

Zócalos De Granito 1.0500 ml 699.16 592.51 106.65 622.13 111.98 734.12


Derretido Cemento Blanco (100 LBS) 0.0110 Fds 1,500.00 1,271.19 228.81 13.98 2.52 16.50
Mezcla para Natilla 0.0002 m3 9,867.92 8,362.64 1,505.28 1.67 0.30 1.97
Colocación Zócalos De Granito Para Pisos 1.0000 ml 143.28 143.28 0.00 143.28
Corte De Zócalos 1.0000 Ud 8.00 8.00 0.00 8.00
Herramientas (2%) 0.0200 P.A. 752.59 637.79 114.80 12.76 2.30 15.05
COSTO/ML 918.92

Piso mármol travertino

Piso de Marmol 1.0500 M2 2,832.00 2,400.00 432.00 2,520.00 453.60 2,973.60


Derretido para Marmol 0.0333 Fds 1,351.00 1,144.92 206.08 38.13 6.86 44.99
Mezcla 1:4 0.0320 m3 5,912.96 5,010.98 901.98 160.35 28.86 189.21
Pegamento Especial (Laticrete) 0.2222 fda 1,216.58 1,031.00 185.58 229.11 41.24 270.35
MO Colocacion de piso 1.0000 m2 955.17 955.17 0.00 955.17
Corte De Chazos De 0.30 Mts 3.0000 Ud 10.00 30.00 0.00 30.00
MO derretido pisos 1.0000 m2 15.45 15.45 0.00 15.45
Herramientas (2%) 0.0200 P.A. 3,478.15 2,947.59 530.57 58.95 10.61 69.56
COSTO/M2 4,548.34

Zócalo en mármol travertino

Zocalo 1.0500 ml 295.00 250.00 45.00 262.50 47.25 309.75


Derretido para Marmol 0.0110 Fds 1,351.00 1,144.92 206.08 12.59 2.27 14.86
mezcla para natilla 0.0002 m3 9,867.92 8,362.64 1,505.28 1.67 0.30 1.97
Pegamento Especial (Laticrete) 0.0267 fda 1,216.58 1,031.00 185.58 27.49 4.95 32.44
colocación zócalos 1.0000 ml 143.28 143.28 0.00 143.28
corte de zócalos 1.0000 Ud 8.00 8.00 0.00 8.00
Herramientas (2%) 0.0200 P.A. 359.03 304.26 54.77 6.09 1.10 7.18
COSTO/ML 517.48

Piso de hormigon estampado

madera pino americano bruta 1.0000 P2 125.00 105.93 19.07 105.93 19.07 125.00
Hormigón 180 KG/cms2(industrial) 0.1050 m3 6,852.58 5,807.27 1,045.31 609.76 109.76 719.52
Preparacion del terreno 1.0000 m2 20.00 20.00 0.00 20.00
Suministro y colocacion estampado 1.0000 m2 281.02 238.15 42.87 238.15 42.87 281.02
malla electrosoldada 15 x 15 1.0000 m2 102.60 86.95 15.65 86.95 15.65 102.60
mano de obra malla electrosoldada 15 x 15 1.0000 m2 92.05 92.05 0.00 92.05
Herramientas (2%) 0.0200 P.A. 1,248.14 1,057.75 190.39 21.15 3.81 24.96
COSTO/M2 1,365.15
COSTO/M3 10,502.12

TERMINACION DE ESCALERAS

Escalones de granito negro

derretido cemento blanco (100 LBS) 0.0250 FDS 1,500.00 1,271.19 228.81 31.78 5.72 37.50
huella y contrahuella 0.5500 m2 5,824.00 4,935.59 888.41 2,714.58 488.62 3,203.20
mezcla 1:3 0.0068 m3 6,993.84 5,926.98 1,066.86 40.30 7.25 47.56
Hormigón 140 KG/cms2 (1:3:5) 0.0214 m3 6,116.15 5,183.18 932.97 110.92 19.97 130.89
madera pino americano bruta 0.2733 P2 125.00 105.93 19.07 28.95 5.21 34.16
clavos acero 0.1093 LBS 55.10 46.69 8.41 5.10 0.92 6.02
clavos corrientes con cabeza 2" en adelante 0.1093 LBS 60.00 50.85 9.15 5.56 1.00 6.56
confección de escalones revestidos de mezc 1.0000 ml 308.75 308.75 0.00 308.75
montura de escalones en escaleras 1.0000 ml 358.19 358.19 0.00 358.19
Herramientas (2%) 0.0200 P.A. 3,465.89 2,937.19 528.69 58.74 10.57 69.32
COSTO/ML 4,202.14

Escalones de PORCELANATO

derretido cemento blanco (100 LBS) 0.0250 FDS 1,500.00 1,271.19 228.81 31.78 5.72 37.50
huella y contrahuella PORCELANATO 0.6600 m2 500.00 423.73 76.27 279.66 50.34 330.00
Bisel para escalones .05 x .45 2.5000 ud 200.00 169.49 30.51 423.73 76.27 500.00
Hormigón 140 KG/cms2 (1:3:5) 0.0214 m3 6,116.15 5,183.18 932.97 110.92 19.97 130.89
madera pino americano bruta 0.2733 P2 125.00 105.93 19.07 28.95 5.21 34.16
clavos acero 0.1093 LBS 55.10 46.69 8.41 5.10 0.92 6.02
clavos corrientes con cabeza 2" en adelante 0.1093 LBS 60.00 50.85 9.15 5.56 1.00 6.56
confección de escalones revestidos de mezc 1.0000 ml 308.75 308.75 0.00 308.75
montura de escalones en escaleras 1.0000 ml 358.19 358.19 0.00 358.19
Herramientas (2%) 0.0200 P.A. 1,038.57 880.14 158.43 17.60 3.17 20.77
COSTO/ML 1,732.84

Escalones de marmol en entrada

derretido para marmol 0.0250 FDS 1,351.00 1,144.92 206.08 28.62 5.15 33.78
huella y contrahuella 0.6600 m2 3,071.29 2,602.79 468.50 1,717.84 309.21 2,027.05
mezcla 1:3 0.0068 m3 6,993.84 5,926.98 1,066.86 40.30 7.25 47.56
Hormigón 140 KG/cms2 (1:3:5) 0.0214 m3 6,116.15 5,183.18 932.97 110.92 19.97 130.89
madera pino americano bruta 0.2733 P2 125.00 105.93 19.07 28.95 5.21 34.16
clavos acero 0.1093 LBS 55.10 46.69 8.41 5.10 0.92 6.02
clavos corrientes con cabeza 2" en adelante 0.1093 LBS 60.00 50.85 9.15 5.56 1.00 6.56
confección de escalones revestidos de mezc 1.0000 ml 308.75 308.75 0.00 308.75
montura de escalones en escaleras 1.0000 ml 716.38 716.38 0.00 716.38
Herramientas (2%) 0.0200 P.A. 2,286.01 1,937.30 348.71 38.75 6.97 45.72
COSTO/ML 3,356.86

Descanso en granito negro

derretido cemento blanco (100 LBS) 0.0250 FDS 1,500.00 1,271.19 228.81 31.78 5.72 37.50
Descanso en granito 1.0500 m2 5,824.00 4,935.59 888.41 5,182.37 932.83 6,115.20
mezcla 1:4 0.0320 M3 5,912.96 5,010.98 901.98 160.35 28.86 189.21
madera pino americano bruta 0.2733 P2 125.00 105.93 19.07 28.95 5.21 34.16
clavos acero 0.1093 LBS 55.10 46.69 8.41 5.10 0.92 6.02
clavos corrientes con cabeza 2" en adelante 0.1093 LBS 60.00 50.85 9.15 5.56 1.00 6.56
MO Colocacion de piso 1.0000 M2 373.74 373.74 0.00 373.74
MO derretido pisos 1.0000 m2 15.45 15.45 0.00 15.45
Herramientas (2%) 0.0200 P.A. 6,388.66 5,414.12 974.54 108.28 19.49 127.77
COSTO/M2 6,905.62

Zocalo de PORCELANATO en escaleras

Porcelanato 0.3000 m2 500.00 423.73 76.27 127.12 22.88 150.00


derretido cemento blanco (100 LBS) 0.0250 FDS 1,500.00 1,271.19 228.81 31.78 5.72 37.50
mezcla para natilla 0.0002 M3 9,867.92 8,362.64 1,505.28 1.67 0.30 1.97
colocación zócalos 1.0000 ML 143.28 143.28 0.00 143.28
corte de zócalos 1.0000 UD 8.00 8.00 0.00 8.00
Herramientas (2%) 0.0200 P.A. 189.47 160.57 28.90 3.21 0.58 3.79
COSTO/ML 344.54

Zocalo de Granito negro en escalones

Zocalo 1.0500 ML 600.00 508.47 91.53 533.90 96.10 630.00


derretido cemento blanco (100 LBS) 0.0250 FDS 1,500.00 1,271.19 228.81 31.78 5.72 37.50
mezcla para natilla 0.0002 M3 9,867.92 8,362.64 1,505.28 1.67 0.30 1.97
colocación zócalos 1.0000 ML 143.28 143.28 0.00 143.28
corte de zócalos 1.0000 UD 8.00 8.00 0.00 8.00
Herramientas (2%) 0.0200 P.A. 669.47 567.35 102.12 11.35 2.04 13.39
COSTO/ML 834.14
Escalones de cemento pulido con canto reforzado

mezcla 1:3 0.0072 m3 6,993.84 5,926.98 1,066.86 42.67 7.68 50.36


Hormigón 140 KG/cms2 (1:3:5) 0.0239 m3 6,116.15 5,183.18 932.97 123.88 22.30 146.18
madera pino americano bruta 0.2733 P2 125.00 105.93 19.07 28.95 5.21 34.16
clavos acero 0.1093 LBS 55.10 46.69 8.41 5.10 0.92 6.02
clavos corrientes con cabeza 2" en adelante 0.1093 LBS 60.00 50.85 9.15 5.56 1.00 6.56
confección de escalones revestidos de mezc 1.0000 ml 308.75 308.75 0.00 308.75
terminación de escalones de cemento pulid 1.0000 ml 308.75 308.75 0.00 308.75
perfil de hierro incluye colocacion 1.0000 ml 268.63 227.65 40.98 227.65 40.98 268.63
Herramientas (2%) 0.0200 P.A. 243.27 206.16 37.11 4.12 0.74 4.87
COSTO/Ml 1,134.27

REVESTIMIENTO

Porcelanto en baños y cocinas

derretido cemento blanco (100 LBS) 0.0333 FDS 1,500.00 1,271.19 228.81 42.33 7.62 49.95
Cerámica de Baños Porcelanato 1.1000 M2 800.00 677.97 122.03 745.76 134.24 880.00
ESTOPA 0.0500 LBS 125.00 105.93 19.07 5.30 0.95 6.25
Pegamento Especial para Ceramica 0.1667 fda 215.00 182.20 32.80 30.37 5.47 35.83
colocación en paredes de losetas cerámica 1.0000 M2 329.73 329.73 0.00 329.73
corte de losetas de cerámica 4.5000 UD 5.00 22.50 0.00 22.50
Herramientas (2%) 1.0000 P.A. 25.96 22.00 3.96 22.00 3.96 25.96
COSTO/M2 1,350.23

Cerámica en Area de Lavado y cuarto servicio

derretido cemento blanco (100 LBS) 0.0333 FDS 1,500.00 1,271.19 228.81 42.33 7.62 49.95
cerámica 20 x 20 Area de lavado 1.1000 M2 500.00 423.73 76.27 466.10 83.90 550.00
ESTOPA 0.0500 LBS 125.00 105.93 19.07 5.30 0.95 6.25
Pegamento Especial para Ceramica 0.1667 fda 215.00 182.20 32.80 30.37 5.47 35.83
colocación en paredes de losetas cerámica 1.0000 M2 329.73 329.73 0.00 329.73
corte de losetas de cerámica 4.5000 UD 5.00 22.50 0.00 22.50
Herramientas (2%) 1.0000 P.A. 19.36 16.41 2.95 16.41 2.95 19.36
COSTO/M2 1,013.63

Cenefa 0.10 x 0.25

Cenefa 0.10 x 0.25 1.0500 ML 160.00 135.59 24.41 142.37 25.63 168.00
Derretido 0.0110 Fds 800.00 677.97 122.03 7.46 1.34 8.80
Pegamento Especial para Ceramica 0.0167 fda 215.00 182.20 32.80 3.04 0.55 3.58
colocación listelo/cenefa 1.0000 ML 55.84 55.84 0.00 55.84
Herramientas (2%) 1.0000 P.A. 4.72 4.00 0.72 4.00 0.72 4.72
COSTO/ML 240.95

Revestimiento Piedra lajas en pared frontal

Revestimiento de piedra androcita 1.1000 m2 842.16 713.69 128.47 785.06 141.31 926.38
mezcla 1:3 0.0210 m3 6,993.84 5,926.98 1,066.86 124.47 22.40 146.87
colocación de piedra 1.0000 m2 494.60 494.60 0.00 494.60
Cantos de lajas 1.0000 ml 142.34 120.63 21.71 120.63 21.71 142.34
Derretido para piedras 0.0330 Fds 456.11 386.53 69.58 12.76 2.30 15.05
Herramientas (2%) 1.0000 P.A. 36.37 30.82 5.55 30.82 5.55 36.37
COSTO/M2 1,761.61

Revestimiento en coralina

Coralina 1.1000 m2 1,085.60 920.00 165.60 1,012.00 182.16 1,194.16


mezcla 1:3 0.0210 m3 6,993.84 5,926.98 1,066.86 124.47 22.40 146.87
Pegamento Especial (Laticrete) 0.2222 fda 1,216.58 1,031.00 185.58 229.11 41.24 270.35
colocación de piedra 1.0000 m2 494.60 494.60 0.00 494.60
Derretido para piedras 0.0330 Fds 456.11 386.53 69.58 12.76 2.30 15.05
Herramientas (2%) 1.0000 P.A. 41.13 34.86 6.27 34.86 6.27 41.13
COSTO/M2 2,162.16

Revestimiento en fachada frontal con mallado de Coralina

mallado de Coralina 1.1000 m2 2,800.00 2,372.88 427.12 2,610.17 469.83 3,080.00


mezcla 1:3 0.0210 m3 6,993.84 5,926.98 1,066.86 124.47 22.40 146.87
Pegamento Especial (Laticrete) 0.2222 fda 1,216.58 1,031.00 185.58 229.11 41.24 270.35
colocación de piedra 1.0000 m2 494.60 494.60 0.00 494.60
Derretido para piedras 0.0330 Fds 456.11 386.53 69.58 12.76 2.30 15.05
Herramientas (2%) 1.0000 P.A. 78.85 66.82 12.03 66.82 12.03 78.85
COSTO/M2 4,085.72

Revestimiento Marmol Crema marfil Pulido 0.40 x 0.60

Derretido para Marmol 0.0333 Fds 1,351.00 1,144.92 206.08 38.13 6.86 44.99
Marmol crema marfil 1.1000 M2 3,071.29 2,602.79 468.50 2,863.07 515.35 3,378.42
Pegamento Especial (Laticrete) 0.2222 fda 1,216.58 1,031.00 185.58 229.11 41.24 270.35
ESTOPA 0.0500 LB 125.00 105.93 19.07 5.30 0.95 6.25
Mezcla 1:3 0.0210 M3 6,993.84 5,926.98 1,066.86 124.47 22.40 146.87
Colocación de mármol para revestimiento 1.0000 M2 577.03 577.03 0.00 577.03
MO derretido pisos 1.0000 m2 15.45 15.45 0.00 15.45
Herramientas (2%) 1.0000 P.A. 87.45 74.11 13.34 74.11 13.34 87.45
COSTO/M2 4,526.81

Revestimiento de ladrillo 2" x 2" x 8"

ladrillos BIZCOCHOS 2x2x8" 72.0000 UD 20.00 16.95 3.05 1,220.34 219.66 1,440.00
mezcla 1:3 0.0160 m3 6,993.84 5,926.98 1,066.86 94.83 17.07 111.90
ESTOPA 0.0500 LBS 125.00 105.93 19.07 5.30 0.95 6.25
gasoil 0.0050 GLS 205.70 174.32 31.38 0.87 0.16 1.03
colocación de ladrillos LIMPIOS A una cara 0.0700 MILLAR 8,655.45 605.88 0.00 605.88
corte de ladrillos 0.0429 m2 17.50 0.75 0.00 0.75
Herramientas (2%) 1.0000 P.A. 42.28 35.83 6.45 35.83 6.45 42.28
COSTO/M2 2,208.09

PINTURA

Pintura Acrílica en interiores o exteriores (2 manos)

pintura acrílica (POPULAR) 0.1100 GLS 700.00 593.22 106.78 65.25 11.75 77.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 1.0000 P.A. 2.31 1.96 0.35 1.96 0.35 2.31
COSTO/M2 231.59

Pintura Mongranite en interiores o exteriores (2 manos)

Pintura 0.1100 GLS 949.90 805.00 144.90 88.55 15.94 104.49


materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 1.0000 P.A. 2.86 2.43 0.44 2.43 0.44 2.86
COSTO/M2 259.63

Primer impermeabilizante de base (1 mano)

Primer de base (1 manos) 0.1100 GLS 698.56 592.00 106.56 65.12 11.72 76.84
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 18.20 18.20 0.00 18.20
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 1.0000 P.A. 2.06 1.75 0.31 1.75 0.31 2.06
COSTO/M2 182.11

Primer de base (1 mano)

Primer de base (1 manos) 0.1100 GLS 600.00 508.47 91.53 55.93 10.07 66.00
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 18.20 18.20 0.00 18.20
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 1.0000 P.A. 1.85 1.57 0.28 1.57 0.28 1.85
COSTO/M2 171.05

Pintura Sherwin williams en interiores o exteriores (2 manos)

Pintura Sherwin williams 0.1100 GLS 1,062.00 900.00 162.00 99.00 17.82 116.82
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 1.0000 P.A. 3.11 2.63 0.47 2.63 0.47 3.11
COSTO/M2 272.21

Pintura Semigloss en interiores o exteriores (2 manos)

Pintura Semigloss 0.1100 GLS 1,045.00 885.59 159.41 97.42 17.53 114.95
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura de agua (1er.a. mano) incl. masilla, l 1.0000 m2 40.37 40.37 0.00 40.37
pintura de agua (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 1.0000 P.A. 3.07 2.60 0.47 2.60 0.47 3.07
COSTO/M2 270.30

Pintura Mantenimiento en interiores o exteriores (2 manos)

pintura mantenimiento 0.0800 GLS 1,130.00 957.63 172.37 76.61 13.79 90.40
materiales DIVERSOS (LIJAS, másilla, piedra, 1.0000 m2 75.00 63.56 11.44 63.56 11.44 75.00
pintura Mnten. (1er.a. mano) incl. masilla, li 1.0000 m2 40.37 40.37 0.00 40.37
pintura manteni (2da. mano) 1.0000 m2 26.91 26.91 0.00 26.91
másilla, lija y piedra en paredes 1.0000 m2 10.00 10.00 0.00 10.00
Herramientas (2%) 0.0200 P.A. 175.40 148.64 26.76 2.97 0.54 3.51
COSTO/MT² 220.42 25.77 246.19

TERMINACION DE TECHO

Fino de mezcla de techo plano

madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0700 m3 6,993.84 5,926.98 1,066.86 414.89 74.68 489.57
fino en techo horiz. sin incl. subida de mater 1.0000 m2 99.33 99.33 0.00 99.33
Herramientas (2%) 1.0000 P.A. 7.78 6.60 1.19 6.60 1.19 7.78
COSTO/M2 598.31

Fino de mezcla de techo inclinado

madera pino americano bruta 0.0130 P2 125.00 105.93 19.07 1.38 0.25 1.63
mezcla 1:3-A 0.0350 m3 #REF! #REF! #REF! #REF! #REF! #REF!
fino en techo horiz. sin incl. subida de mater 1.0000 m2 131.38 131.38 0.00 131.38
Herramientas (2%) 0.0200 P.A. #REF! #REF! #REF! #REF! #REF! #REF!
COSTO/MT2 #REF! #REF! #REF!

Zabaleta

Mortero 1:3-A 0.0100 m3 4,131.44 3,501.22 630.22 35.01 6.30 41.31


Mano de Obra 1.0000 ml 87.58 87.58 0.00 87.58
Herramientas (2%) 1.0000 P.A. 1.89 1.60 0.29 1.60 0.29 1.89
COSTO/Ml 130.78

Techo de Aluzinc y estructura metalica

techo de aluzinc 1.0000 m2 1,250.00 1,059.32 190.68 1,059.32 190.68 1,250.00


forro techo 1.0000 m2 850.00 720.34 129.66 720.34 129.66 850.00
estructura metalica LISTA 1.0000 m2 4,500.00 4,500.00 0.00 4,500.00
Herramientas (2%) 1.0000 P.A. 132.00 111.86 20.14 111.86 20.14 132.00
COSTO/M2 6,732.00

Goteros de ranura

mezcla 1:1.5:5 (pañete) 0.0003 m3 4,082.74 3,459.95 622.79 1.04 0.19 1.22
andamios interiores 1.0000 m2 9.52 8.06 1.45 8.06 1.45 9.52
goteros en ranuras 1.0000 ml 99.58 84.39 15.19 84.39 15.19 99.58
Herramientas (2%) 1.0000 P.A. 2.21 1.87 0.34 1.87 0.34 2.21
COSTO/ML 112.53

Antepecho H=1.00 mts

Bloques en muros de 6" 5.0000 m2 860.60 729.32 131.28 3,646.62 656.39 4,303.01
Pañete en muros interior 10.0000 m2 249.47 211.42 38.05 2,114.17 380.55 2,494.71
Cantos 10.0000 mL 142.34 120.63 21.71 1,206.28 217.13 1,423.41
Pintura acrilica 10.0000 m2 117.91 99.93 17.99 999.25 179.87 1,179.12
Herramientas (2%) 1.0000 P.A. 175.59 148.81 26.79 148.81 26.79 175.59
COSTO/TOTAL 9,575.85

COSTO/Ml 1,791.05

Antepecho H= 0.20 mts

Bloques en muros de 6" 1.0000 m2 860.60 729.32 131.28 729.32 131.28 860.60
Pañete en muros interior 2.0000 m2 249.47 211.42 38.05 422.83 76.11 498.94
Cantos 10.0000 mL 142.34 120.63 21.71 1,206.28 217.13 1,423.41
Pintura acrilica 2.0000 m2 117.91 99.93 17.99 199.85 35.97 235.82
Herramientas (2%) 1.0000 P.A. 47.96 40.65 7.32 40.65 7.32 47.96
COSTO/TOTAL 3,066.74

COSTO/Ml 489.23

MISCELANEOS

Baranda en Bloques de 8" terminada con pañete h=1.00 mts

Bloques en muros de 8" 5.0000 m2 1,024.31 868.06 156.25 4,340.29 781.25 5,121.54
Pañete muros 10.0000 m2 249.47 211.42 38.05 2,114.17 380.55 2,494.71
Cantos 10.0000 mL 142.34 120.63 21.71 1,206.28 217.13 1,423.41
Pintura acrilica 10.0000 m2 117.91 99.93 17.99 999.25 179.87 1,179.12
Herramientas (2%) 1.0000 P.A. 191.96 162.68 29.28 162.68 29.28 191.96
COSTO/TOTAL 10,410.75
COSTO/Ml 1,958.03

Limpieza Continua y Final

Trabajador no Calificado ( 2 Hombres 6mes 285.9600 DIA 497.95 142,393.78 0.00 142,393.78
Herramientas y materiales de limpieza 1.0000 PA 5,000.00 4,237.29 762.71 4,237.29 762.71 5,000.00
147,393.78

M. O.Transporte Interno

Trabajador no Calificado ( 3 Hombres 6 me 428.9400 DIA 497.95 213,590.67 0.00 213,590.67


Herramientas y materiales de limpieza 1.0000 PA 10,000.00 8,474.58 1,525.42 8,474.58 1,525.42 10,000.00
223,590.67

Verja perimetral de protecion en Zinc

Planchas de zinc 2.1978 pl 253.46 214.80 38.66 472.08 84.97 557.05


Madera 2 x 4, 1 x 4 12.0048 P2 50.00 42.37 7.63 508.68 91.56 600.24
Obrero 0.3300 dia 823.75 271.84 0.00 271.84
Mano de obra albañil de segunda 0.3300 dia 1,568.75 517.69 0.00 517.69
Capataz 0.3300 dia 2,471.25 815.51 0.00 815.51
Herramientas( clavos de zinc, etc) 1.0000 PA 100.00 84.75 15.25 84.75 15.25 100.00
M.O. Confección Hoyos 2.0000 Ml 20.00 40.00 0.00 40.00
M.O. Fijación (Todo Costo) 2.0000 Ml 50.00 100.00 0.00 100.00
Herramientas (2%) 1.0000 P.A. 47.36 40.14 7.22 40.14 7.22 47.36
3,049.69
COSTO/Ml 1,207.71

MADERA Y MANO DE OBRA DE COLOCACION CEPOS EN COLUMNAS


Analisis p/unidad

Materiales : 51.1200

Madera bruta 2'' x 4'' ( para Puntales) + 3 % 8.2400 P2 125.00 105.93 19.07 872.88 157.12 1,030.00
Desp. / 6usos
Madera bruta 2'' x 4'' ( para amarres y 41.2000 P2 125.00 105.93 19.07 4,364.41 785.59 5,150.00
Vientos ) + 5 % Desp. / 6 usos
Clavos corrientes de 2'' y 3'' un rehuso de 9.6000 Lbs 35.00 29.66 5.34 284.75 51.25 336.00
30 %
Clavos acero 4.0896 Lbs 55.10 46.69 8.41 190.96 34.37 225.34
Costo/madera 6,741.34

Confección y desmonte:
Brigada :
Maestro 0.2500 H/Día 1,495.00 373.75 0.00 373.75
Carpintero de 1ra ( 1/ hombre) 2.0000 H/Día 1,186.08 2,372.16 0.00 2,372.16
Ayudante ( 1/hombre/Día) 2.0000 H/Día 497.95 995.90 0.00 995.90
Movimiento de madera ( 1.0/hombre/Día) 2.0000 H/Día 497.95 995.90 0.00 995.90

Sub Total 4,737.71


Rendimiento 2.0000 Uds/Día

2,368.86
Herramientas 0.0500 % 118.44

Nota :Se confecionaran cepos por columnas Costo/Ud 2,487.30

COSTO /UD 9,228.63

Suministro y Colocacion de Paragomas


EQUIPOS:
uso de taladro para fijacion 1.0000 ud 25.00 25.00 0.00 25.00
Herramientas 0.0500 % 100.00 84.75 15.25 4.24 0.76 5.00

Sub-Total (1) Equipos 30.00

MATERIALES:
Suministro de paragoma 1.0000 ud 816.64 692.07 124.57 692.07 124.57 816.64
Tornillo para fijacion 4.0000 ud 20.00 16.95 3.05 67.80 12.20 80.00
pintura trafico 1.0000 pa 100.00 84.75 15.25 84.75 15.25 100.00

Sub-Total (2) Materiales 996.64

MANO DE OBRA:
colocacion 1.0000 ud 100.00 100.00 0.00 100.00

Sub-Total (3) Mano de Obra 100.00

COSTO/UD 1,126.64

Aceras y paseos de 0.10 mts de espesor

madera pino americano bruta 0.2200 P2 125.00 105.93 19.07 23.31 4.19 27.50
clavos corrientes con cabeza 2" en adelante 0.1100 LBS 60.00 50.85 9.15 5.59 1.01 6.60
mezcla 1:3 0.0210 m3 6,993.84 5,926.98 1,066.86 124.47 22.40 146.87
Hormigón 140 KG/cms2 (1:3:5) 0.0840 m3 6,116.15 5,183.18 932.97 435.39 78.37 513.76
construcción de ACERA FROTADA y VIOLINA 1.0000 m2 139.98 139.98 0.00 139.98
Herramientas (2%) 1.0000 P.A. 11.15 9.45 1.70 9.45 1.70 11.15
COSTO/M2 845.85

Conten

madera pino americano bruta 1.0800 P2 125.00 105.93 19.07 114.41 20.59 135.00
clavos corrientes con cabeza 2" en adelante 0.5400 LBS 60.00 50.85 9.15 27.46 4.94 32.40
Hormigón 140 KG/cms2 (1:3:5) 0.1020 m3 6,116.15 5,183.18 932.97 528.68 95.16 623.85
cemento gris 0.0278 FDS 480.00 406.78 73.22 11.31 2.04 13.34
construcción de contenes con bordillo de 3 1.0000 ml 145.66 145.66 0.00 145.66
Herramientas (2%) 1.0000 P.A. 12.27 10.40 1.87 10.40 1.87 12.27
COSTO / ML 962.53

Bordillos de 0.30m en interior del parqueo

madera pino americano bruta 1.0800 P2 125.00 105.93 19.07 114.41 20.59 135.00
clavos corrientes con cabeza 2" en adelante 0.5400 LBS 60.00 50.85 9.15 27.46 4.94 32.40
Hormigón 140 KG/cms2 (1:3:5) 0.1200 m3 6,116.15 5,183.18 932.97 621.98 111.96 733.94
cemento gris 0.0278 FDS 480.00 406.78 73.22 11.31 2.04 13.34
construcción de contenes con bordillo de 3 1.0000 ml 145.66 145.66 0.00 145.66
Herramientas (2%) 1.0000 P.A. 13.65 11.56 2.08 11.56 2.08 13.65
COSTO / ML 1,073.99

Escalera con huellas de madera y barandas en vidrio templado

Confeccion de base de hormigon para apoyo 1.0000 ud 9,500.00 9,500.00 0.00 9,500.00
Escalones de madera en roble 16.8000 ml 3,000.00 2,542.37 457.63 42,711.86 7,688.14 50,400.00
baranda en vidrio templadometalica 5.2000 ml 7,500.00 6,355.93 1,144.07 33,050.85 5,949.15 39,000.00
Perfil metalico 16.8000 ml 200.00 169.49 30.51 2,847.46 512.54 3,360.00
COSTO/UD 102,260.00

Jardineras H=1.20 mts (incluye muros de bloques de 0.15 mts, pañete, pintura, cantos e impermeabilizante)

Excavacion 0.3600 m3 1,742.52 627.31 0.00 627.31


Zapata muro de 6 0.2250 m3 8,649.08 7,329.73 1,319.35 1,649.19 296.85 1,946.04
Relleno de reposicion 0.1200 m3 914.62 109.75 0.00 109.75
Bote 0.4680 m3 1,288.31 602.93 0.00 602.93
MUROS DE BLOCKS DE 6 3/8 2.7000 m2 860.60 729.32 131.28 1,969.17 354.45 2,323.62
PAÑETE 4.8000 m2 249.47 211.42 38.05 1,014.80 182.66 1,197.46
CANTOS 4.0000 ml 142.34 120.63 21.71 482.51 86.85 569.36
PINTURA ACRILICA 4.8000 m2 117.91 99.93 17.99 479.64 86.34 565.98
MANO DE OBRA ESPECIAL POR TRAB. PEQU 1.0000 PA 300.00 300.00 0.00 300.00
Impermeabilizante 2.0000 m2 348.10 295.00 53.10 590.00 106.20 696.20
Costo/ml 4,115.15

Jardineras circulares D=2.10 m mts H=0.20 mts.

Excavacion 0.3600 m3 1,742.52 627.31 0.00 627.31


Zapata muro de 6 0.2250 m3 8,649.08 7,329.73 1,319.35 1,649.19 296.85 1,946.04
Relleno de reposicion 0.1200 m3 914.62 775.10 139.52 93.01 16.74 109.75
Bote 0.4680 m3 1,288.31 602.93 0.00 602.93
MUROS DE BLOCKS DE 6 3/8 0.7000 m2 860.60 729.32 131.28 510.53 91.89 602.42
PAÑETE 0.8000 m2 249.47 211.42 38.05 169.13 30.44 199.58
CANTOS 4.0000 ml 142.34 120.63 21.71 482.51 86.85 569.36
PINTURA ACRILICA 0.8000 m2 117.91 99.93 17.99 79.94 14.39 94.33
MANO DE OBRA ESPECIAL POR TRAB. PEQU 1.0000 PA 500.00 500.00 0.00 500.00
Costo/ud 5,251.73

Jardineras en muros de bloques cuadradas (2.00 x 2.00) mts H=0.20 mts.

Excavacion 0.7200 m3 1,742.52 1,254.62 0.00 1,254.62


Zapata muro de 6 0.4500 m3 8,649.08 7,329.73 1,319.35 3,298.38 593.71 3,892.09
Relleno de reposicion 0.2400 m3 914.62 775.10 139.52 186.02 33.48 219.51
Bote 0.9360 m3 1,288.31 1,205.86 0.00 1,205.86
MUROS DE BLOCKS DE 6 3/8 1.4000 m2 860.60 729.32 131.28 1,021.05 183.79 1,204.84
PAÑETE 1.6000 m2 249.47 211.42 38.05 338.27 60.89 399.15
CANTOS 8.0000 ml 142.34 120.63 21.71 965.03 173.70 1,138.73
PINTURA ACRILICA 1.6000 m2 117.91 99.93 17.99 159.88 28.78 188.66
MANO DE OBRA ESPECIAL POR TRAB. PEQU 1.0000 PA 500.00 500.00 0.00 500.00
Costo/ud 10,003.46

Canaleta con rejilla

EXCAVACION 1.0000 M3 902.61 902.61 0.00 902.61


BOTE 1.3000 m3 1,288.31 1,674.81 0.00 1,674.81
losa de fondo en hormigon simple e=0.10 m 0.2000 m3 3,981.28 3,373.96 607.31 674.79 121.46 796.26
Muros de bloques de 4 4.0000 m2 783.34 663.85 119.49 2,655.39 477.97 3,133.35
Panete de fondo y muros 5.6000 m2 249.47 211.42 38.05 1,183.93 213.11 1,397.04
Zabaleta 8.0000 ml 96.18 81.51 14.67 652.05 117.37 769.42
rejilla 4.0000 ml 5,900.00 5,000.00 900.00 20,000.00 3,600.00 23,600.00
COSTO/ML 7,748.83

Juntas de Expansion con foam


EQUIPOS:
Herramientas 1.0000 pa 11.86 10.05 1.81 10.05 1.81 11.86

Sub-Total (1) Equipos 11.86


MATERIALES:
foam 4 X 4_x2¨ 0.0750 M3 2,186.24 1,852.75 333.49 138.96 25.01 163.97

Sub-Total (2) Materiales 163.97

MANO DE OBRA:
trabajador calificado 1.0000 dia 545.01 545.01 0.00 545.01
ayudante 1.0000 dia 640.55 640.55 0.00 640.55

RENDIMIENTO: 5.0000 ml/dia


237.11
Sub-Total (3) Mano de Obra
Costo/ml 412.94

Junta de polietileno expandido de 1/2" en union de panderetas con vigas porticos


EQUIPOS:
Herramientas 1.0000 pa 11.86 10.05 1.81 10.05 1.81 11.86

Sub-Total (1) Equipos 11.86


MATERIALES:
foam 4 X 4_x2¨ 0.1111 plancha 181.47 153.79 27.68 17.09 3.08 20.16

Sub-Total (2) Materiales 20.16

MANO DE OBRA:
trabajador calificado 1.0000 dia 545.01 545.01 0.00 545.01
ayudante 1.0000 dia 640.55 640.55 0.00 640.55

RENDIMIENTO: 10.0000 ml/dia


118.56
Sub-Total (3) Mano de Obra

Costo/ml 150.57

Junta de construcción y contraccion (JC) en piso con sellador poliuretano

poliuretano 0.3333 ud 435.83 369.35 66.48 123.12 22.16 145.28


instalacion 1.0000 ml 50.00 50.00 0.00 50.00
desperdicios 1.0000 pa 25.00 21.19 3.81 21.19 3.81 25.00
COSTO/ML 220.28

Planchuela de 4" x 3/16" en union de panderetas con columnas porticos

planchela 1.0000 ml 175.00 148.31 26.69 148.31 26.69 175.00


instalacion 1.0000 ml 50.00 50.00 0.00 50.00
desperdicios 1.0000 pa 25.00 21.19 3.81 21.19 3.81 25.00
COSTO/ML 250.00

Tramo en closedmaid

closedmail 9.8400 pl 160.00 135.59 24.41 1,334.24 240.16 1,574.40


instalacion 1.0000 ud 1,000.00 1,000.00 0.00 1,000.00
desperdicios 1.0000 pa 200.00 169.49 30.51 169.49 30.51 200.00
COSTO/ML 924.80

HORMIGON ESTRUCTURAL CLASE A PARA BADENES

Cemento 8.9400 Fdas. 480.00 406.78 73.22 3,636.61 654.59 4,291.20


agregados 1.5000 M3 1,100.00 1,650.00 0.00 1,650.00
Agua 60.0000 Gls 1.00 60.00 0.00 60.00
costo mortero /m3 + 5% 4,004.2800

Ligado con ligadora 1.0000 m3 500.00 500.00 0.00 500.00


Madera 5.5000 p2 50.00 42.37 7.63 233.05 41.95 275.00
encofrado y desencofrado 16.5000 p2 7.00 115.50 0.00 115.50
Acero 0.5900 qq 3,800.00 3,220.34 579.66 1,900.00 342.00 2,242.00
MO acero 0.5900 qq 250.00 147.50 0.00 147.50
Clavos, hilos, etc. 50.0000
mano de obra 600.9600
COSTO / M3 7,050.24

Suministro y Colocacion tierra negra

tierra negra 1.0500 m3 700.00 735.00 0.00 735.00


MANO DE OBRA 1.0000 m3 100.00 100.00 0.00 100.00
Costo/m3 835.00

Suministro y Colocacion grama

grama 1.0500 m2 85.00 89.25 0.00 89.25


MANO DE OBRA 1.0000 m2 30.00 30.00 0.00 30.00
Costo/m3 119.25

ENCACHE DE PIEDRA

Cemento 9.0000 Fdas. 480.00 406.78 73.22 3,661.02 658.98 4,320.00


Agregado 1.0000 M3 900.00 900.00 0.00 900.00
Agua 60.0000 gls 1.00 60.00 0.00 60.00
ligado con ligadora 1.0000 m3 500.00 500.00 0.00 500.00
H.S.+5% desp 3801.00
PIEDRA:
Recolección y carga 175.50
cargío a mano 48.07
Cargío mecánico 32.53
Arranque 18.29
Transporte 30.0000 Km 14.30 12.12 2.18 363.56 65.44 429.00
PIEDRA/M3 703.39
RESUMEN:
40% H.S. 1520.40
100% PIEDRA 703.39
Mano obra 738.49
Costo RD$/Mt3 2,962.28
REND= 5M2/M3
Costo RD$/Mt2 592.46

Suministro y Colocacion de Espejos

Espejos para baños 1.0000 M2 2,421.00 2,051.69 369.31 2,051.69 369.31 2,421.00
Herramientas 1.0000 M2 200.00 169.49 30.51 169.49 30.51 200.00
montura de espejos 1.0000 M2 650.00 650.00 0.00 650.00
Herramientas (2%) 1.0000 P.A. 65.42 55.44 9.98 55.44 9.98 65.42
COSTO/M2 3,336.42
Barra para cortina de baños 1er. nivel

barra de aluminio 3/4" para cortina de baño 6.0000 PL 41.67 35.31 6.36 211.86 38.14 250.00
cubrefalta niquelado de ½" 2.0000 UD 7.41 6.28 1.13 12.56 2.26 14.82
tarugos plásticoS 3/8" 4.0000 UD 1.17 0.99 0.18 3.97 0.71 4.68
tornillo 1½" x 12 4.0000 UD 3.30 2.79 0.50 11.17 2.01 13.18
montura de accesorios empotrados 1.0000 UD 450.00 450.00 0.00 450.00
Herramientas (2%) 1.0000 P.A. 14.65 12.42 2.24 12.42 2.24 14.65
COSTO/UD 747.34

Barra para Closet

barra de aluminio 3/4" para cortina de baño 6.0000 PL 35.77 30.31 5.46 181.86 32.74 214.60
cubrefalta niquelado de ½" 2.0000 UD 7.41 6.28 1.13 12.56 2.26 14.82
tarugos plásticoS 3/8" 4.0000 UD 1.17 0.99 0.18 3.97 0.71 4.68
tornillo 1½" x 12 4.0000 UD 3.30 2.79 0.50 11.17 2.01 13.18
montura de accesorios empotrados 1.0000 UD 250.00 250.00 0.00 250.00
Herramientas (2%) 1.0000 P.A. 9.95 8.43 1.52 8.43 1.52 9.95
COSTO/ML 277.17

ANALISIS HORMIGON ARMADO

ZAPATAS

ZAPATAS DE MURO DE 6" (0.25 m x 0.45 m) 3 Ø 3/8, cangrejos Ø 3/8 @ 0.25

Acero 3/8'' 0.7700 QQ 3,800.00 3,220.34 579.66 2,479.66 446.34 2,926.00


Acero 1/2'' 0.0000 QQ 3,800.00 3,220.34 579.66 0.00 0.00 0.00
Alambre #18 1.5400 lbs 100.00 84.74 15.25 130.50 23.49 153.99
Hormigon 210 kg/m2 (Inc. bombeo) 1.0500 M3 7,205.15 6,106.06 1,099.09 6,411.36 1,154.04 7,565.40
Mano obra acero zapata de muros 8.8900 ml 100.00 889.00 0.00 889.00
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
RD$/M3 8,649.08

ZAPATAS DE MURO DE 8" (0.25 m x 0.60 m) 3 Ø 3/8, cangrejos Ø 3/8 @ 0.25

Acero 3/8'' 0.6300 QQ 3,800.00 3,220.34 579.66 2,028.81 365.19 2,394.00


Acero 1/2'' 0.0000 QQ 3,800.00 3,220.34 579.66 0.00 0.00 0.00
Alambre #18 1.2600 lbs 100.00 84.74 15.25 106.78 19.22 125.99
Hormigon 240 kg/m2 (Inc. bombeo) 1.0500 M3 7,700.00 6,525.43 1,174.58 6,851.70 1,233.31 8,085.00
Mano obra acero zapata de muros 6.6700 ml 100.00 667.00 0.00 667.00
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
RD$/M3 8,407.28

Zapata De Columnas 2 x 2 x 0.30=1.2m3 Ø 1/2 @ 0.20 A.D, CAMADA INFERIOR Y SUPERIOR

Acero 1/2'' 1.9600 QQ 3,800.00 3,220.34 579.66 6,311.86 1,136.14 7,448.00


Alambre #18 3.9200 lbs 100.00 84.74 15.25 332.19 59.79 391.98
Hormigon 240 kg/m2 (Inc. bombeo) 1.0500 M3 5,800.00 4,915.25 884.75 5,161.02 928.98 6,090.00
Mano obra acero zapata 1.9600 QQ 250.00 490.00 0.00 490.00
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
RD$/M3 11,398.54

PILOTES D=0.40 MTS. L= 12 MTS 6 Ø 3/4 , est Ø 3/8 @ 0.20

Acero ? 3/8" G-40 mts 1.0700 QQ 3,800.00 3,220.34 579.66 3,445.76 620.24 4,066.00
Acero ? 3/4" G-40 mts 4.3000 QQ 3,800.00 3,220.34 579.66 13,847.46 2,492.54 16,340.00
Alambre #18 10.7400 lbs 100.00 84.74 15.25 910.13 163.82 1,073.95
Hormigon 240 kg/m2 FLUIDO PARA PILOTES 1.5800 M3 5,800.00 4,915.25 884.75 7,766.10 1,397.90 9,164.00
Mano obra acero 5.3700 qq 250.00 1,342.50 0.00 1,342.50
limpieza y descapote de pilotes 1.0000 m3 1,742.52 1,742.52 0.00 1,742.52
barrenado 1.0000 UD 52,411.79 44,416.77 7,995.02 44,416.77 7,995.02 52,411.79
Doblaje de varilla 6.0000 UD 40.00 240.00 0.00 240.00
recogida material excavado 2.2608 m3 305.12 689.82 0.00 689.82
RD$/UD 78,395.19

Platea (12.0x12.0x0.80) mts. ACERO ADICIONAL Ø 3/4 @ 0.20 , Ø 1 @ 0.15 LX CAMADA INFERIOR, Ø 1 @ 0.10 LY CAMADA INFERIOR, Ø 3/4 @ 0.25 LX CAMADA SUPERIOR

Acero 1'' 2.2600 QQ 3,800.00 3,220.34 579.66 7,277.97 1,310.03 8,588.00


Acero 3/4'' 0.9100 QQ 3,800.00 3,220.34 579.66 2,930.51 527.49 3,458.00
Alambre #18 6.3400 lbs 100.00 84.74 15.25 537.27 96.71 633.97
Hormigon 240 kg/m2 (Inc. bombeo) 1.0500 M3 5,800.00 4,915.25 884.75 5,161.02 928.98 6,090.00
Mano obra acero zapata 3.1700 QQ 250.00 792.50 0.00 792.50
guardera h=1.20 mts 2.0000 ml 360.00 720.00 0.00 720.00
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
RD$/M3 15,304.66

COLUMNAS

Columnas (0.60*0.70) mts 26 Ø 3/4 , est Ø 3/8 @ 0.10

Acero 3/4'' 3.3000 QQ 3,800.00 3,220.34 579.66 10,627.12 1,912.88 12,540.00


Acero 3/8'' 2.5700 QQ 3,800.00 3,220.34 579.66 8,276.27 1,489.73 9,766.00
Alambre #18 11.7500 lbs 100.00 84.74 15.25 995.72 179.23 1,174.95
Hormigon 280 kg/m2 (Inc. bombeo) 1.0500 M3 6,500.00 5,508.47 991.53 5,783.90 1,041.10 6,825.00
Madera a todo costo 2.3800 ML 920.00 2,189.60 0.00 2,189.60
Mano obra acero 5.8700 QQ 392.00 2,301.04 0.00 2,301.04
Subida de Acero (10%) 5.8700 QQ 39.20 230.10 0.00 230.10
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
RD$/M3 25,678.49
Columnas (0.30*0.30) mts 8 Ø 3/4 , est Ø 3/8 @ 0.10

Acero 1'' 0.0000 QQ 3,800.00 3,220.34 579.66 0.00 0.00 0.00


Acero 3/4'' 4.7400 QQ 3,800.00 3,220.34 579.66 15,264.41 2,747.59 18,012.00
Acero 3/8'' 1.6200 QQ 3,800.00 3,220.34 579.66 5,216.95 939.05 6,156.00
Alambre #18 12.7300 lbs 100.00 84.74 15.25 1,078.77 194.18 1,272.95
Hormigon 280 kg/m2 (Inc. bombeo) 1.0500 M3 6,500.00 5,508.47 991.53 5,783.90 1,041.10 6,825.00
Madera a todo costo 11.1100 ML 600.00 6,666.00 0.00 6,666.00
Mano obra acero 6.3700 QQ 392.00 2,497.04 0.00 2,497.04
Subida de Acero (10%) 6.3700 QQ 39.20 249.70 0.00 249.70
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
RD$/M3 31,541.25

MUROS DE HORMIGON ARMADO

Muro Perimetral de contencion e=0.20 mts Ø 1/2 @ 0.20 A.V. Ø 3/8 @ 0.20 A.H.

Acero 1'' 0.0000 QQ 3,800.00 3,220.34 579.66 0.00 0.00 0.00


Acero 1/2'' 1.3400 QQ 3,800.00 3,220.34 579.66 4,315.25 776.75 5,092.00
Acero 3/8'' 0.7400 QQ 3,800.00 3,220.34 579.66 2,383.05 428.95 2,812.00
Alambre #18 4.1700 lbs 100.00 84.74 15.25 353.37 63.61 416.98
Hormigon 280 kg/m2 (Inc. bombeo) 1.0500 M3 6,500.00 5,508.47 991.53 5,783.90 1,041.10 6,825.00
Madera a todo costo ambas caras 10.0000 M2 425.00 4,250.00 0.00 4,250.00
Mano obra acero 2.0800 QQ 392.00 815.36 0.00 815.36
Subida de Acero (10%) 2.0800 QQ 39.20 81.54 0.00 81.54
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
Impermeabilizante Macdrain Geocompuesto 5.0000 M2 465.80 394.75 71.05 1,973.73 355.27 2,329.00
RD$/M3 19,416.85

Muro de H.A. 3/8"@ 0.20, a.d. e=0.20

Acero 3/8'' 0.7200 QQ 3,800.00 3,220.34 579.66 2,318.64 417.36 2,736.00


Alambre #18 1.4400 lbs 100.00 84.74 15.25 122.03 21.97 143.99
Hormigon 280 kg/m2 (Inc. bombeo) 1.0500 M3 6,500.00 5,508.47 991.53 5,783.90 1,041.10 6,825.00
Madera a todo costo ambas caras 10.0000 M2 425.00 4,250.00 0.00 4,250.00
Mano obra acero 0.7200 QQ 392.00 282.24 0.00 282.24
Subida de Acero (10%) 0.7200 QQ 39.20 28.22 0.00 28.22
Personal por la casa 1.0500 m3 242.13 205.20 36.94 215.46 38.78 254.24
RD$/M3 13,252.81

DINTELES Y VIGAS DE AMARRE

VIGA DE AMARRE, DINTEL (0.15 X 0.20 MTS.) mts L >1.5 M Asup 2 Ø 3/8", est Ø 3/8 @ 0.30 ,Ainf 3 Ø 1/2"

Acero 1/2'' 2.6800 QQ 3,800.00 3,220.34 579.66 8,630.51 1,553.49 10,184.00


Acero 3/8'' 2.0100 QQ 3,800.00 3,220.34 579.66 6,472.88 1,165.12 7,638.00
alambre dulce #18 9.3900 LBS 100.00 84.74 15.25 795.73 143.23 938.96
Armadura de dinteles y vigas de amarre 33.3300 ML 100.00 3,333.00 0.00 3,333.00
Hormigon 210 kg/m2 c/Ligadora 1.0500 M3 3,981.28 3,373.97 607.31 3,542.66 637.68 4,180.34
ligado y vaciado a mano de dinteles, vigas 33.3300 ML 40.00 1,333.20 0.00 1,333.20
Moldes Dinteles de hasta 2.00 m long. y has 33.3300 ML 250.00 8,332.50 0.00 8,332.50
RD$/M3 28,359.24

VIGA DE AMARRE, DINTEL (0.20 X 0.20 MTS.) mts L >1.5 M Asup 2 Ø 3/8", est Ø 3/8 @ 0.30 ,Ainf 3 Ø 1/2"

Acero 1/2'' 2.0100 QQ 3,800.00 3,220.34 579.66 6,472.88 1,165.12 7,638.00


Acero 3/8'' 1.6400 QQ 3,800.00 3,220.34 579.66 5,281.36 950.64 6,232.00
alambre dulce #18 7.3100 LBS 100.00 84.74 15.25 619.47 111.50 730.97
Armadura de dinteles y vigas de amarre 25.0000 ML 100.00 2,500.00 0.00 2,500.00
Hormigon 210 kg/m2 c/Ligadora 1.0500 M3 3,981.28 3,373.97 607.31 3,542.66 637.68 4,180.34
ligado y vaciado a mano de dinteles, vigas 25.0000 ML 40.00 1,000.00 0.00 1,000.00
Moldes Dinteles de hasta 2.00 m long. y has 25.0000 ML 250.00 6,250.00 0.00 6,250.00
RD$/M3 22,627.74

VIGAS PORTICOS

30*0.40) mts , Acero Superior 6 Ø 3/4" , Acero inferior 3 Ø 1" , Adicionales en cada nudo 3 Ø 1",Est Ø 3/8 @ 0.10 en toda la longitud

Acero 1'' 2.9900 QQ 3,800.00 3,220.34 579.66 9,628.81 1,733.19 11,362.00


Acero 3/4'' 2.4800 QQ 3,800.00 3,220.34 579.66 7,986.44 1,437.56 9,424.00
Acero 3/8'' 1.1800 QQ 3,800.00 3,220.34 579.66 3,800.00 684.00 4,484.00
Alambre #18 13.3100 lbs 100.00 84.74 15.25 1,127.92 203.03 1,330.94
Hormigon 280 kg/m2 (Inc. bombeo) 1.0500 M3 6,500.00 5,508.47 991.53 5,783.90 1,041.10 6,825.00
Madera a todo costo 8.3300 ML 500.00 4,165.00 0.00 4,165.00
Mano obra acero 6.6500 QQ 392.00 2,606.80 0.00 2,606.80
Subida de Acero (10%) 6.6500 QQ 39.20 260.68 0.00 260.68
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
RD$/M3 29,849.14

, Acero Superior 3 Ø 3/4" , Acero inferior 6 Ø 1" , Adicionales en cada nudo 3 Ø 1",Est Ø 3/8 @ 0.10 en nudos y Est Ø 3/8 @ 0.20 en vano central

Acero 1'' 6.1400 QQ 3,800.00 3,220.34 579.66 19,772.88 3,559.12 23,332.00


Acero 3/4'' 1.9800 QQ 3,800.00 3,220.34 579.66 6,376.27 1,147.73 7,524.00
Acero 3/8'' 1.4600 QQ 3,800.00 3,220.34 579.66 4,701.69 846.31 5,548.00
Alambre #18 19.1800 lbs 100.00 84.74 15.25 1,625.35 292.56 1,917.92
Hormigon 280 kg/m2 (Inc. bombeo) 1.0500 M3 6,500.00 5,508.47 991.53 5,783.90 1,041.10 6,825.00
Madera a todo costo 4.1700 ML 900.00 3,753.00 0.00 3,753.00
Mano obra acero 9.5900 QQ 392.00 3,759.28 0.00 3,759.28
Subida de Acero (10%) 9.5900 QQ 39.20 375.93 0.00 375.93
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
RD$/M3 37,681.47

LOSAS

Losa Maciza h=0.14 m. Ø 3/8 @ 0.20 A.D.

Acero ¢3/8 1.2900 QQ 3,800.00 3,220.34 579.66 4,154.24 747.76 4,902.00


Alambre #18 2.5800 lbs 100.00 84.74 15.25 218.63 39.35 257.99
Hormigon 280 kg/m2 (Inc. bombeo) 1.0500 M3 6,500.00 5,508.47 991.53 5,783.90 1,041.10 6,825.00
Madera a todo costo 7.1400 M2 260.00 220.34 39.66 1,573.22 283.18 1,856.40
Mano obra acero 1.2900 QQ 250.00 322.50 0.00 322.50
subida de Acero (10%) 1.2900 QQ 25.00 32.25 0.00 32.25
Subida de Madera 0.7100 M2 260.00 184.60 0.00 184.60
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
RD$/M3 12,443.78

Losa Maciza h=0.12 m. Ø 3/8 @ 0.25 A.D.

Acero ¢3/8 1.3900 QQ 3,800.00 3,220.34 579.66 4,476.27 805.73 5,282.00


Alambre #18 2.7800 lbs 100.00 84.74 15.25 235.58 42.40 277.99
Hormigon 280 kg/m2 (Inc. bombeo) 1.0500 M3 6,500.00 5,508.47 991.53 5,783.90 1,041.10 6,825.00
Madera a todo costo 8.3300 M2 260.00 220.34 39.66 1,835.42 330.38 2,165.80
Mano obra acero 1.3900 QQ 250.00 347.50 0.00 347.50
subida de Acero (10%) 1.3900 QQ 25.00 34.75 0.00 34.75
Subida de Madera 0.8300 M2 260.00 215.80 0.00 215.80
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
RD$/M3 13,058.68

Toping en H.A. esp. 0.10 mt. 10.0000 M2

Acero Malla 2.5 X 2.5(10 x 10) 10.0000 M2 145.83 123.58 22.25 1,235.85 222.45 1,458.30
Hormigon 280 kg/m2 (Inc. bombeo) 1.0500 M3 6,500.00 5,508.47 991.53 5,783.90 1,041.10 6,825.00
Mano obra acero Malla 10.0000 M2 30.00 300.00 0.00 300.00
Uso del equipo Helicotero para Topping 10.0000 M2 120.00 1,200.00 0.00 1,200.00
RD$/M3 9,832.20
RD$/M2 983.22

Toping H.A. esp. 0.05 mt. 20.0000 M2

Acero Malla 2.5 X 2.5(10 x 10) 20.0000 M2 145.83 123.58 22.25 2,471.69 444.91 2,916.60
Hormigon 280 kg/m2 (Inc. bombeo) 1.0500 M3 6,500.00 5,508.47 991.53 5,783.90 1,041.10 6,825.00
Mano obra acero Malla 20.0000 M2 30.00 600.00 0.00 600.00
Uso del equipo Helicotero para Topping 20.0000 M2 120.00 2,400.00 0.00 2,400.00
RD$/M3 12,839.40
RD$/M2 641.97

Losa Aligerada una direccion H=15 CMS 34.3600 M2

Acero G-40 en nervios de 1/2" 3.9600 QQ 3,800.00 3,220.34 579.66 12,752.54 2,295.46 15,048.00
Acero G-40 en nervios de 3/8" 1.3700 QQ 3,800.00 3,220.34 579.66 4,411.86 794.14 5,206.00
Acero adicional de 3/8" 1.0900 QQ 3,800.00 3,220.34 579.66 3,510.17 631.83 4,142.00
Alambre #18 12.8400 lbs 100.00 84.74 15.25 1,088.09 195.86 1,283.95
Hormigon 280 kg/m2 (Inc. bombeo) 1.0500 M3 6,500.00 5,508.47 991.53 5,783.90 1,041.10 6,825.00
Madera a todo costo 34.3600 M2 260.00 8,933.60 0.00 8,933.60
Mano obra acero en nervios 55.7700 ml 40.00 2,230.80 0.00 2,230.80
Mano de obra acero adicional 1.0900 QQ 250.00 272.50 0.00 272.50
Suministro Bloques Aligerados 0.15 x 0.40 x 13.0000 UD 404.55 342.84 61.71 4,456.91 802.24 5,259.15
Mano de obra colocacion de Bloques aliger 13.0000 UD 30.00 390.00 0.00 390.00
Subida de Acero Nervios (10%) 55.7700 ml 4.00 223.08 0.00 223.08
Subida de Acero (10%) 1.0900 qq 25.00 27.25 0.00 27.25
Subida de Madera 3.4400 M2 260.00 894.40 0.00 894.40
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
RD$/TOTAL 40,487.34
RD$/M3 7,854.86
RD$/M2 1,178.23

Losa pisos e=0.15 mts

Malla electrosoldada 2.5 x 2.5(10 X 10) 6.6700 M2 145.83 123.58 22.25 824.31 148.38 972.69
Hormigon 240 kg/m2 (Inc. bombeo) 1.0500 M3 5,800.00 4,915.25 884.75 5,161.02 928.98 6,090.00
Madera a todo costo (GUARDERAS) 4.0000 ML 150.00 600.00 0.00 600.00
Mano obra malla 6.6700 M2 30.00 200.10 0.00 200.10
Uso del equipo Helicotero 6.6700 M2 120.00 800.40 0.00 800.40
Fibra para aumentar resistencia hormigon 2.0000 LBS 153.40 130.00 23.40 260.00 46.80 306.80
RD$/M3 9,001.60
RD$/M2 1,350.24

RAMPAS

Rampas en Escalera Ø 1/2 @ 0.10, Ø 3/8 @ 0.25 e=0.15 m

Acero ¢1/2 G-40 2.2600 QQ 3,800.00 3,220.34 579.66 7,277.97 1,310.03 8,588.00
Acero ¢3/8 G-40 0.4000 QQ 3,800.00 3,220.34 579.66 1,288.14 231.86 1,520.00
Alambres #18 5.3100 LB 100.00 84.74 15.25 449.98 81.00 530.98
Hormigon 280 kg/m2 (Inc. bombeo) 1.0500 M3 6,500.00 5,508.47 991.53 5,783.90 1,041.10 6,825.00
Madera a todo costo 6.6700 M2 260.00 1,734.20 0.00 1,734.20
Armado rampa escalera 1.0000 Rampa 2,500.00 2,500.00 0.00 2,500.00
Personal por la casa 1.0500 m3 242.13 254.24 0.00 254.24
RD$/M3 17,533.83

LISTADO DE SUBCONTRATOS

PUERTAS, VENTANAS Y ALUMINIO- VIDRIO

Marcos de madera ml 360.80


Puertas de madera preciosa a todo costo ud 22,000.00
Puerta principal de madera preciosa a todo costo ud 25,000.00
Cerradura de seguridad baldwin ud 9,200.00
Puertas corredizas de madera a todo costo m2 10,115.18
Puertas de Polimetal ud 6,500.00
Puerta Acustica ud 20,000.00
Vent de madera a todo costo m2 3,300.00
Puertas y Ventanas corrrederas vidrio Claro y aluminio blanco m2 3,600.00
Ventanas correderas de cristal aluminio blanco Perfil P92 Gris, Vidrios Blue-Green. m2 5,396.14
Ventana Proyectada de Cristal aluminio blanco Perfil P92 Gris, Vidrios Blue-Green. m2 9,966.99
Ventana Abatible de Cristal aluminio blanco Perfil P92 Gris, Vidrios Blue-Green. m2 11,998.48
Ventanas de doble vidrio sin camara de aire, con marco interior , escurridor de agua y M2 19,368.00
perfileria P92
Puertas correderas de Aluminio Blanco y Vidrio claro Perfil P92 Gris, Vidrios Blue-Green. m2 5,078.72
Puertas de Cristal fijo y marco de aluminio tipo comercial m2 10,500.00
Puertas metalicas m2 4,000.00
Porton Vehicular de hierro m2 5,380.00
Verja de entrada en hierro m2 5,380.00
Vidrio Fijo y marco de aluminio blanco m2 3,552.00
Vidrio Fijo y marco de aluminio blanco Perfil P92 Gris, Vidrios Blue-Green. m2 4,316.91
Puertas en Closet de riel no plegadizas m2 6,933.33
Puertas en Closet y Despensa abatibles m2 5,702.80
Puertas en Closet y Despensa correderas m2 6,400.00
Puerta plegadiza en bano de servicio 0.70 x2.20 m ud 3,500.00
Puerta de tola 0.90 x 2.10 mts ud 7,000.00
Puertas MDF hidrofuga enchapada en roble, incluye instalacion ud 9,000.00
Puertas Everdoor (0.9 x 2.10) m ud 6,500.00
Cortinas de Banos en cristal (1.92 x 2.00) m2 4,427.08
Puerta de acero perforado m2 6,000.00
Puerta metalica m2 5,000.00
Puerta chapa (1.00 x 2.10) mts m2 9,523.81
Puerta chapa con rejilla en patinillo m2 9,523.81
Ventana de aluminio y vidrio oscilo batiente m2 10,157.44
Ventanas de aluminio y vidrio abatible de una o dos hojas fijas m2 10,157.44
Ventana en Lobby de aluminio y vidrio m2 9,141.70
Vidrio fijo natural templado m2 7,618.08
Puerta doble de cristal con bandas de vinilo (2.00 x 2.17) mts m2 11,238.10
Puerta cristal translucido y acero inoxidable (0.90 x 2.17) mts m2 10,613.76
Puerta de aluminio en zonas de AC m2 10,000.00
Mampara en vidrio templado P2 804.86
Mampara en vidrio templado m2 8,660.27
Baranda para balcones en aluminio y vidrio de acero inoxidable ml 7,500.00

DIVISIONES LIGERAS

Plafond en PVC m2 600.00


Plafond sheet rock M2 850.00
Fascias sheetrock ML 550.00
Fascias en sheetrock de 10 cms. De profundidad ML 400.00
Fascias en sheetrock de 20 cms. De profundidad ML 500.00
Fascias en sheetrock de 40 cms. De profundidad ML 600.00
Sheet rock a dos caras M2 900.00

MISCELANEOS

Estuco a todo costo m2 125.00


Forro de madera de Cedro en Walking Closet m2 7,532.00
Baranda para escalera ml 3,228.00
Baranda para escalera en entrada principal ml 4,100.00
Pasamanos para escalera ml 2,500.00
Muebles de baños ml 10,000.00
Topes de baños en marmol m2 7,041.65
Estrias en rampa vehicular a todo costo m2 225.00
Pisos de marmol crema marfil, suministro, instalacion, pulido, a todo costo (ANTICATO) m2 2,977.38
Zocalos de marmol crema marfil, suministro, instalacion, pulido, a todo costo (ANTICATO) ml 803.04
Revestimientos de marmol crema marfil, suministro, instalacion, pulido, a todo costo
(ANTICATO sin cotizacion) m2 3,058.44
Zocalos de madera, suministro, instalacion, a todo costo ml 885.00
Tope de granito m2 6,348.40
Gabinetes de piso ml 8,200.00
Gabinetes de pared ml 8,200.00
Fumigacion m2 80.00
Pañete de yeso ATC m2 200.00
Cornisa en yeso en techo ml 0.00
Calentador de 30 gls ud 20,405.56
esquinero ud 1,350.00
Baños portatiles mes/ud 4,130.00
Rejilla para desague pluvial en parqueos ml 5,900.00
Masilla elastometrica ml 40.06
Piso de goma en gimnasio m2 2,261.83
Piso dinofelx para gimnasios m2 4,635.90
Rejilla de ventilación en cuarto de planta m2 3,000.00
Estuco Plastico valenciano a todo costo m2 800.00
Escalera metalica posterior a todo costo ud 85,000.00
Organizadores de closet closemaid ML 659.77
Colocacion y aplicacion Estampado al hormigon m2 281.02
Revestimiento madera sabina M2 1,069.29
angular 1 1/2 x 1 1/2 x 3/16 + COLOCACION ml 149.24

IMPERMEABILIZANTE

Aislante termico PRODEX m2 413.00


Impermeabilizante Macdrain Geocompuesto Drenante con instalacion en muros de
Contención m2 465.80
Impermeabilizante de techo de lona asfaltica e=4mm m2 413.00
Impermeabilizante de techo de lona asfaltica e=3mm m2 348.10
Aislante termico poliestireno tipo Danopreno 40 m2 1,770.00

MISCELANEOS
ANALISIS VARIOS

Pañete en muros ( a plomo ) 1 er nivel

madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. 1.0000 M2 187.07 187.07 0.00 187.07
nivel
andamios 1.0000 M2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/MT² 352.98 29.86 382.85

Pañete en techos, vigas

madera pino americano cepillada 0.0330 P2 111.11 94.16 16.95 3.11 0.56 3.67
mezcla 1:1.5:5 (pañete) 0.0220 M3 7,513.44 6,367.32 1,146.12 140.08 25.21 165.30
pañete exterior, maestrado y a plomo 1er. n 1.0000 M2 242.13 242.13 0.00 242.13
andamios 1.0000 M2 34.68 29.39 5.29 29.39 5.29 34.68
Herramientas (2%) 0.0200 P.A. 168.96 143.19 25.77 2.86 0.52 3.38
COSTO/MT² 417.56 31.58 449.14

Pañete en columnas

Mortero 1:4 de empañete. 0.0150 M3 5,912.96 5,010.98 901.98 75.16 13.53 88.69
Regla madera americana cepillada 1"x4" / 2 0.0250 P2 111.11 94.16 16.95 2.35 0.42 2.78
Andamios en madera 1.0000 M2 34.68 29.39 5.29 29.39 5.29 34.68
Mano de obra empañete techos y vigas 1.0000 M2 242.13 242.13 0.00 242.13
COSTO/MT² 349.03 19.24 368.27

Careteo en losas, vigas y columnas

Escoba 0.0100 U 15.00 12.71 2.29 0.13 0.02 0.15


mezcla 1:6 0.0080 m3 4,712.52 3,993.66 718.86 31.95 5.75 37.70
fraguache con escoba 1.0000 m2 28.41 28.41 0.00 28.41
Andamios 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
Herramientas (2%) 0.0200 P.A. 37.85 32.08 5.77 0.64 0.12 0.76
COSTO/MT² 80.98 9.46 90.45

Goteros de ranura

mezcla 1:1.5:5 (pañete) 0.0003 m3 7,513.44 6,367.32 1,146.12 1.91 0.34 2.25
andamios interiores 1.0000 m2 23.44 19.86 3.57 19.86 3.57 23.44
goteros en ranuras 1.0000 ml 164.67 139.55 25.12 139.55 25.12 164.67
Herramientas (2%) 0.0200 P.A. 2.25 1.91 0.34 0.04 0.01 0.05
COSTO/ML 161.36 29.04 190.40

Cantos en vigas, losa y columnas

madera pino americano cepillada 0.2590 P2 111.11 94.16 16.95 24.39 4.39 28.78
mezcla 1:1.5:5 (pañete) 0.0040 m3 7,513.44 6,367.32 1,146.12 25.47 4.58 30.05
cantos en vigas, columnas, antepechos y m 1.0000 ml 82.33 82.33 0.00 82.33
Herramientas (2%) 0.0200 P.A. 58.83 49.86 8.97 1.00 0.18 1.18
COSTO/ML 133.19 9.15 142.34
PERSONAL POR LA CASA PARA VACIADOS(REND. 30.00 M3)

Capataz 0.5000 h/d 2,471.25 1,235.63 0.00 1,235.63


Albañil de 2da. Cat. 1.0000 h/d 1,568.75 1,568.75 0.00 1,568.75
Ayudante albañil 1.1000 h/d 1,058.75 1,164.63 0.00 1,164.63
Obreros 4.0000 h/d 823.75 3,295.00 0.00 3,295.00
RD$/total 7,264.00
RD$/M3 242.13

mezcla 1:3

cemento gris 11.5100 Fds 480.00 406.78 73.22 4,682.03 842.77 5,524.80
arena gruesa ITABO (de mina) 1.0000 m3 1,200.00 1,200.00 0.00 1,200.00
agua 69.0400 Gls 1.00 69.04 0.00 69.04
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
Total partida mezcla 1:3 costo/m3 6,993.84

mezcla 1:3-A

cemento gris 11.5100 Fds 480.00 406.78 73.22 4,682.03 842.77 5,524.80
arena gruesa ITABO LAVADA (de PLANTA) 1.0000 m3 1,200.00 1,200.00 0.00 1,200.00
agua 69.0400 Gls 1.00 69.04 0.00 69.04
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
Total partida mezcla 1:3-A costo/m3 6,993.84

mezcla 1:4

cemento gris 9.1100 Fds 480.00 406.78 73.22 3,705.76 667.04 4,372.80
arena gruesa ITABO (de mina) 1.0600 m3 1,200.00 1,272.00 0.00 1,272.00
agua 68.1600 Gls 1.00 68.16 0.00 68.16
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
Total partida mezcla 1:4 costo/m3 5,912.96

mezcla 1:6

cemento gris 6.4600 Fds 480.00 406.78 73.22 2,627.80 473.00 3,100.80
arena gruesa ITABO (de mina) 1.1200 m3 1,200.00 1,344.00 0.00 1,344.00
agua 67.7200 Gls 1.00 67.72 0.00 67.72
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
Total partida mezcla 1:6 costo/m3 4,712.52

mezcla 1:1.5:5 (pañete)

cemento gris 9.4600 Fds 480.00 406.78 73.22 3,848.14 692.66 4,540.80
arena FINA (para pañete) 0.9100 m3 1,200.00 1,092.00 0.00 1,092.00
cal (50 LBS) 6.2900 Fds 260.00 220.34 39.66 1,385.93 249.47 1,635.40
agua 45.2400 Gls 1.00 45.24 0.00 45.24
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
Total Partida Mezcla 1:1.5:5 costo/m3 7,513.44

mezcla 1:1.5:5 (pañete) CON ARENA GRUESA

cemento gris 9.4600 Fds 480.00 406.78 73.22 3,848.14 692.66 4,540.80
Arena lavada 0.9100 m3 1,500.00 1,365.00 0.00 1,365.00
cal (50 LBS) 6.2900 Fds 260.00 220.34 39.66 1,385.93 249.47 1,635.40
agua 45.2400 Gls 1.00 45.24 0.00 45.24
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
Total Partida Mezcla 1:1.5:5 costo/m3 7,786.44

mezcla 1:2:5 (pañete en techo)

cemento gris 11.9700 Fds 480.00 406.78 73.22 4,869.15 876.45 5,745.60
arena FINA (para pañete) 0.8700 m3 1,500.00 1,305.00 0.00 1,305.00
cal (50 LBS) 6.0000 Fds 260.00 220.34 39.66 1,322.03 237.97 1,560.00
agua 43.1200 Gls 1.00 43.12 0.00 43.12
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
Total Partida Mezcla 1:2:5 costo/m3 8,853.72

mezcla para natilla

cemento gris 40.6100 FDS 480.00 406.78 73.22 16,519.32 2,973.48 19,492.80
agua 121.5200 GLS 1.00 121.52 0.00 121.52
Total partida mezcla para natilla costo/m3 9,867.92

mezcla 1:2
cemento gris 15.5700 Fds 480.00 406.78 73.22 6,333.56 1,140.04 7,473.60
arena gruesa ITABO (de mina) 0.9000 m3 1,200.00 1,080.00 0.00 1,080.00
agua 70.1000 Gls 1.00 70.10 0.00 70.10
M.O. Mezclado 1.0000 m3 200.00 200.00 0.00 200.00
Total Partida Mezcla 1:2:5 costo/m3 8,823.70

Hormigón 100 KG/cms2 (Ligadora)

Materiales:
cemento gris 6.3500 Fds 480.00 406.78 73.22 2,583.05 464.95 3,048.00
arena gruesa ITABO LAVADA (de PLANTA) 0.5400 m3 1,500.00 810.00 0.00 810.00
gravilla 3/4 @ 3/8" 0.7300 m3 1,500.00 1,095.00 0.00 1,095.00
agua 64.0000 Gls 1.00 64.00 0.00 64.00
SUB-TOTAL DE MATERIALES 5,017.00

Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 245.53 245.53 0.00 245.53
Ayudante albañil (1) 1.0000 Hr. 132.34 132.34 0.00 132.34
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 477.30
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 272.75

Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 423.73 76.27 423.73 76.27 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA 285.71
HERRAMIENTAS: 5 % M.O. 13.64
SUB-TOTAL DE EQUIPOS 299.35

Total Partida Hormigón 100 Kg/cm2 costo/m3 3,557.10


costo/m2 177.85

Hormigón 140 KG/cms2 (Ligadora)

Materiales:
cemento gris 7.5300 Fds 480.00 406.78 73.22 3,063.05 551.35 3,614.40
arena gruesa ITABO LAVADA (de PLANTA) 0.5200 m3 1,500.00 780.00 0.00 780.00
gravilla 3/4 @ 3/8" 0.7300 m3 1,500.00 1,095.00 0.00 1,095.00
agua 54.6500 Gls 1.00 54.65 0.00 54.65
SUB-TOTAL DE MATERIALES 5,544.05

Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 245.53 245.53 0.00 245.53
Ayudante albañil (1) 1.0000 Hr. 132.34 132.34 0.00 132.34
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 477.30
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 272.75

Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 423.73 76.27 423.73 76.27 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA 285.71
HERRAMIENTAS: 5 % M.O. 13.64
SUB-TOTAL DE EQUIPOS 299.35

Total Partida Hormigón 140 Kg/cm2 costo/m3 6,116.15

Hormigón 180 KG/cms2 (Ligadora)

Materiales:
cemento gris 8.3100 Fds 480.00 406.78 73.22 3,380.34 608.46 3,988.80
arena gruesa ITABO LAVADA (de PLANTA) 0.5100 m3 1,500.00 765.00 0.00 765.00
gravilla 3/4 @ 3/8" 0.7100 m3 1,500.00 1,065.00 0.00 1,065.00
agua 51.2200 Gls 1.00 51.22 0.00 51.22
SUB-TOTAL DE MATERIALES 5,870.02

Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 245.53 245.53 0.00 245.53
Ayudante albañil (1) 1.0000 Hr. 132.34 132.34 0.00 132.34
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 290.57
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 166.04

Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 423.73 76.27 423.73 76.27 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA 285.71
HERRAMIENTAS: 5 % M.O. 8.30
SUB-TOTAL DE EQUIPOS 294.02

Total Partida Hormigón 180 Kg/cm2 costo/m3 6,330.08

Hormigón 210 KG/cms2 (Ligadora)

Materiales:
cemento gris 8.9400 Fds 480.00 406.78 73.22 3,636.61 654.59 4,291.20
arena gruesa ITABO LAVADA (de PLANTA) 0.5100 m3 1,500.00 765.00 0.00 765.00
gravilla 3/4 @ 3/8" 0.7000 m3 1,500.00 1,050.00 0.00 1,050.00
agua 51.2200 Gls 1.00 51.22 0.00 51.22
SUB-TOTAL DE MATERIALES 6,157.42

Mano de Obra:
Albañil de primera (1) 1.0000 Hr. 245.53 245.53 0.00 245.53
Ayudante albañil (1) 1.0000 Hr. 132.34 132.34 0.00 132.34
Peones (4) 1.0000 Hr. 102.97 102.97 0.00 102.97
Sub-Total Mano de Obra 290.57
RENDIMIENTO: 1.7500 M3/Hr.
SUB-TOTAL MANO DE OBRA 166.04

Equipos:
Ligadora de 2 Fundas 1.0000 Hr. 500.00 423.73 76.27 423.73 76.27 500.00
RENDIMIENTO: 1.7500 M3/Hr.
TOTAL LIGADORA 285.71
HERRAMIENTAS: 5 % M.O. 8.30
SUB-TOTAL DE EQUIPOS 294.02

Total Partida Hormigón 210 Kg/cm2 costo/m3 6,617.48


República Dominicana
DIRECCION DE INFRAESTRUCTURA Y EQUIPOS
DEPARTAMENTO DE INFRAESTRUCTURAS Y MANTENIMIENTO

PRESUPUESTO
DESCRIPCIÓN DE LA OBRA AMPLIACIÓN Y READECUACIÓN DE ÁREA DE EMERGENCIA
NOMBRE DEL CENTRO HOSPITAL MUNICIPAL DE VICENTE NOBLE
MUNICIPIO VICENTE NOBLE
PROVINCIA BARAHONA
FECHA DE ELABORACIÓN OCT.2022
NOMBRE DE OFERENTE/RNC
TOTAL GENERAL RD$0.00

Costo Unitario Importe


No. Descripción Cantidad UD Subtotal (RD$)
(RD$) (RD$)

1.00 Preliminares 0.00

Caseta almacén de materiales (4.85mx4.95mx3.00m)


1.01 1.00 UD 0.00
(madera de pino, plywood y zinc acanalado)

Suministro e instalación letrero identificativo de la obra,


1.02 tipo banner (tamaño de 8'x4', valla impresa a todo color y 1.00 UD 0.00
tensada sobre estructura de metal con perfiles metálicos)

Fumigación área de fundaciones (tratamientos termitas


1.03 165.00 m² 0.00
subterráneas y comején)

Cerramiento de área en construcción, en madera y Aluzinc,


1.04 30.00 m 0.00
con una puerta vehicular (h=6')

1.05 Demolición losas H.A. 30.00 M3 0.00


1.06 Bote material (incluye traslado y carguío). 39.00 M3 0.00
1.07 Corte y bote de arboles. 10.00 UD 0.00
1.08 Limpieza de terreno. 165.00 M2 0.00
1.09 Replanteo con charrancha 165.00 M2 0.00
2.00 Movimiento de Tierra 0.00
Excavación de material (incluye acopio de material) (a
2.01 41.69 m³N 0.00
mano)

2.02 Excavación de material a cielo abierto, con equipo 45.50 m³N 0.00

Relleno de reposición compactado (con medio mecánicos)


2.03 26.73 m³C 0.00
(con material existente excavado)

Relleno con material granular de mina para conformar


2.04 explanación (incluye suministro de material, transporte, 34.00 m³C 0.00
regado, mojado y compactado con equipo)

2.05 Bote material inservible (incluye traslado y carguío) 19.44 m³E 0.00

3.00 Hormigón Armado 0.00


A BAJO NIVEL DE PISO 0.00

Zapata de columnas C1 (0.90mx1.20mx0.40.m) (Acero


3.01 inferior: 1/2"@0.15m A.D.) (Acero superior: 3/8"@0.25m) 10.80 M3 0.00
(Hormigón Industrial 280kg/cm2).

Zapata de columnas C2 (1.30mx1.20mx0.40m) (Acero


3.02 inferior: 1/2"@0.15m A.D.) (Acero superior: 3/8"@0.25m) 10.80 M3 0.00
(Hormigón Industrial 280kg/cm2).

Zapatas de muros 15cm (0.45mx0.25m), acero long.


3.03 2.90 M3 0.00
3ø3/8", ø3/8"@0.25m (Hormigón Industrial 280kg/cm2).
Viga de amarre 0.15mx0.20m B.N.P. (4ø3/8", est.
3.04 0.62 M3 0.00
3/8"@0.20m). F'c=210kg/cm2
Losa de piso e=0.10m armado con malla
3.05 electrosoldada,15x15 (hormigón industrial 210kg/cm2) 85.00 M2 0.00
(incluye separadores).
B SOBRE NIVEL DE PISO 0.00

Columna C1(0.30mx0.30m) (8 de 3/4") (est. 3/8"@0.10m)


3.06 5.02 M3 0.00
(Hormigón Industrial 280kg/cm2).

Columna C2(0.30mx0.40m) (8 de 3/4") ( est. 3/8" @0.15)


3.07 (altura completa) (incluye cepos) (Hormigón Industrial 6.70 m4 0.00
250kg/cm2).

Dintel 15 x 20 cms, (acero inferior 3 de 1/2") (acero


3.08 superior 2 de 3/8") (estribos 3/8"@0.20m) (Hormigón 0.90 M3 0.00
210kg/cm2).

Viga V1 (0.30x0.40m) (acero inferior: 2 de 3/4") (acero


3.09 superior: 4 de 1/2") (acero central : 2 de 3/8") (est. 2.97 m3 0.00
3/8"@0.20m) (Hormigón Industrial 280kg/cm2).

Viga V2 (0.30mx0.45m) (acero inferior: 2 de 3/4") (acero


3.10 superior: 4 de 1/2") (est. 3/8"@0.20m) (Hormigón 1.60 m3 0.00
Industrial 2580kg/cm2).

Losa (e=0.15 m) en hormigón armado (acero grado 60,


3.11 13.64 M3 0.00
Ø3/8@ @ 0.20m) (Hormigón Industrial 280kg/cm2).

4.00 Muros de Bloques 0.00


Construcción de muros de bloques de hormigón de 6"
4.01 (industrial), bastones ø3/8"@0.40m (con todos los huecos 30.77 m² 0.00
llenos)

Construcción de muros de bloques de hormigón de 6"


4.02 (industrial), bastones ø3/8"@0.60m; Acero horizontal 168.45 m² 0.00
2ø3/8"@0.60m . S.N.P.

Antepecho con bloques de hormigón de 6" (incluyendo


4.03 64.50 m 0.00
pañete y cantos terminado), H=0.40m

5.00 Terminación de Superficies 0.00


5.01 Fraguache 331.68 m² 0.00

5.02 Pañete maestreado en muros exteriores (con mortero 1:4) 266.89 m² 0.00

5.03 Pañete maestreado en muros interiores (con mortero 1:4) 606.57 m² 0.00

5.04 Pañete maestreado en vigas y techos (con mortero 1:4) 212.75 m² 0.00

5.05 Pañete maestreado columnas aisladas (con mortero 1:4) 117.77 m² 0.00

5.06 Cantos 672.98 m 0.00


5.07 Gotero colgante 87.72 m 0.00
6.00 Terminación de Pisos 0.00

Suministro e instalación de baldosas de granito para pisos,


6.01 fondo blanco (0.40mx0.40m), derretido blanco, (pulido, 82.00 m² 0.00
brillado y cristalizado); juntas de 2mm.

Suministro y colocación de zócalos de granito fondo blanco


6.02 (0.40mx0.07m) con derretido blanco, cristalizado; juntas de 66.00 m 0.00
2mm.

Suministro y colocación de piso de porcelanato de alto


tránsito, antideslizante, todo masa, espesor 8mm, formato
6.03 15.00 m² 0.00
0.60mx0.60m o 0.40mx0.40m, rectificada, procedencia
europea

7.00 Plafones 0.00


Suministro y colocación de plafón vinyl-yeso 2'x2', color
7.01 82.00 m² 0.00
blanco
8.00 Revestimientos 0.00
Suministro y colocación revestimiento de porcelanato
8.01 (0.30mx0.60m), rectificada (colocación junta trabada), 67.00 m² 0.00
color a especificar, procedencia europea

Suministro e instalación de cantos plástico (color semejante


8.02 35.00 m 0.00
a cerámica) en esquinas cerámicas.

9.00 Pintura 0.00

Imprimador (primer) acrílico de alto desempeño, 100%


9.01 látex acrílico, resistente a la alcalinidad y a la eflorescencia. 248.87 m² 0.00
Incluye preparación de superficie

Suministro y aplicación de pintura acrílica en interiores,


9.02 calidad superior (dos capas) (incluye preparación de 82.00 m² 0.00
superficie) (para techos)

Suministro y aplicación de pintura acrílica en exteriores,


9.03 calidad superior (dos capas) (incluye preparación de 153.40 m² 0.00
superficie)

Suministro y aplicación de pintura hospitalaria antibacterial


y antimicrobiana, acabado semigloss, calidad superior (dos
9.04 210.89 m² 0.00
capas) (incluye preparación de superficie) (autoprimer y
pintura) (99.9% de efectividad)

10.00 Puertas y Ventanas 0.00


A Puertas de Acero Inoxidable 0.00

Suministro e instalación de puerta doble (2.00x2.10)m de


acero inoxidable grado 316, calibre 19, satinada, cerradura
de acero inoxidable, con visor en vidrio laminado de
seguridad de 6mm 0.20mx0.55m, reforzada en área de
10.01 1.00 UD 0.00
choque de camillas, con placa de empuje, instalada con
cierre oculto en marco superior europea/americana y pivot
en piso, con cierre hermético y felpa, garantía de 5 años.
Entrada camillas.

B Puertas de Polimetal 0.00

Suministro e instalación puerta de polimetal (P-4) de


1.00m x 2.10m de altura, lisa color blanco, llavín tipo
palanca de acero inoxidable, con rejilla para ventilación
10.02 3.00 UD 0.00
0.30mx0.30m (ambos lados de puerta), con brazo
hidráulico en cada hoja y tope fijo en puerta garantía de 5
años

C Ventanas 0.00

Suministro e instalación de ventana corredera en aluminio


P-92, con marcos de aluminio de 1 1/2, vidrio con laminado
10.03 14.00 p² 0.00
de seguridad de 6mm y operadores de palanca en los
extremos, marcos color blanco

Suministro e instalación de vidrio fijo en aluminio P-92,


10.04 con marcos de aluminio de 1 1/2, vidrio con laminado de 60.00 p² 0.00
seguridad de 6mm, marcos color blanco

Suministro y colocación de laminado de protección solar


10.05 (transmisión de luz visible 5%) (medidas por áreas de 74.00 p² 0.00
vidrio)

11.00 Instalaciones Sanitarias (Suministro e instalación) 0.00

Suministro e instalación lavamanos de porcelana sanitaria


antibacterial completo, con pedestal, tamaño de mínimo de
11.01 54cmx47cm, con mezcladora push temporizado (de latón 1.00 UD 0.00
cromado, resistente a corrosión) (cierre 15±5s, caudal: 6
l/min regulable) incluye salidas de agua potable y drenaje,
Suministro e instalación de inodoro elongado de porcelana
sanitaria antibacterial completo, one piece de tanque,
pulsador palanca, tamaño mínimo (76x44x75)cm de bajo
11.02 3.00 UD 0.00
consumo y que cumplan con los requerimientos para
accesibilidad, color blanco, c/asiento y tapa, incluye salida
de agua y de drenaje

Suministro e instalación de desagüe de piso Ø2", PVC SDR


11.03 41, rejilla acero inoxidable (cuadrada 4"x4"), sifonada 3.00 UD 0.00
(completa)
Salida agua potable y desagüe p/meseta en acero inoxidable
11.04 3.00 U 0.00
con fregadero

Suministro e instalación de cambiador de bebé. Plataforma


abatible de polietileno de alta densidad y resistencia. Gran
resistencia a impactos, olores y bacterias. Incorpora
11.04 3.00 UD 0.00
cinturón de seguridad para sujetar al bebé, ajustable
fácilmente con una sola mano. Color gris claro. Con
cavidad para stockar toallas limpias.

Suministro e instalación de papelera o zafacón en acero


inoxidable, accionado de pedal abierto y cierre suave
integrado, de metal con tapa. Extraíble forro interior de
11.05 3.00 UD 0.00
plástico recoge las fugas y derrames y protege el basura
bolsas de roturas. Funcionamiento silencioso y sistema de
amortiguador reduce el ruido. Capacidad 20 lts

Suministro e instalación de espejo, de 1/4" de espesor con


los contornos biselados con distanciadores en acero
inoxidables de 1/2" en la parte inferior y de 1" en la parte
11.06 3.00 UD 0.00
superior para proporcionar una inclinación que permita
visibilidad para pacientes en silla de ruedas dimensiones:
18" x 36" (46 x 91 cm) ancho y alto.

Suministro e instalación dispensador combi/mixto de rollo


o toalla zig-zag. Fabricado en plástico, color blanco de alta
calidad y resistencia. Cerradura con llave y opción
rollo/bobina o toalla zig-zag. Poco voluminoso y fijado a
11.07 pared mediante tacos y tornillos. Admite 1 Rollo de Papel 3.00 UD 0.00
continuo o anchura 240 mm y Ø 130 mm máximo o 400
toallas de papel tipo Z. Recarga rápida y fácil tanto de
rollo/bobina como de toallas. Fácil mantenimiento y
limpieza.

Jabonera en plástico color blanco p/lavamanos, empotrada


11.08 3.00 UD 0.00
en muro
Dispensador de jabón liquido, de plástico, de 800ml,
11.09 3.00 UD 0.00
empotrada en muro

Suministro e instalación de porta papeles rollo en continuo.


Fabricado en plástico color blanco de alta calidad.
Cerradura con llave y visor de control de carga.
11.10 Capacidad rollos de hasta 300m con diámetro máximo de 3.00 UD 0.00
220 mm. y para rollos con mandril de 45 mm. de diámetro.
Fácil limpieza y reposición del rollo. Robusto, resistente y
de larga duración. Apertura batiente frontal.

12.00 Sistema Hidrosanitario 0.00


A Movimiento de tierras 0.00
12.01 Excavación p/tubería a mano 15.00 m³N 0.00
12.02 Relleno de reposición compactado 8.00 m³C 0.00
12.03 Material de asiento p/tubería 10.00 m³ 0.00
12.04 Bote de material 5.00 m³e 0.00
B Suministro y Colocación Tuberías PVC SCH-40 0.00
12.05 Tuberías de ø1/2" PVC SCH-40 40.00 m 0.00
12.06 Tuberías de ø3/4" PVC SCH-40 10.00 m 0.00
12.07 Tuberías de ø1" PVC SCH-40 10.00 m 0.00
12.08 Válvula de paso de bola tipo palanca ø1/2" 5.00 UD 0.00
12.09 Válvula de paso de bola tipo palanca ø3/4" 5.00 UD 0.00
Accesorios y piezas tuberías agua potable (codos, tee,
12.10 1.00 P.A. 0.00
reducciones, uniones y otros)
Suministro y Colocación Tuberías PVC SDR-41
C 0.00
(inc.excavación, asiento de arena & tapado)
12.11 Tuberías de ø4" PVC SDR-41 25.00 m 0.00
12.12 Tuberías de ø6" PVC SDR-41 25.00 m 0.00
Accesorios y piezas tuberías aguas negras (codos, tee,
12.13 1.00 P.A. 0.00
reducciones, uniones y otros)

D Suministro y Colocación Tuberías PVC SDR-32.5 0.00

Desagües pluviales Ø3" PVC SDR-32.5, h= 3.00 m, unión


12.14 con cemento solvente. Incluye parte proporcional de piezas 10.00 UD 0.00
especiales, tapado ranura ambas caras en la pared.

Suministro e instalación de protector p/desagües de techo


12.15 15.00 UD 0.00
(tipo araña)
E Cámara de inspección, trampa de grasa 0.00

Construccion de cámara de inspección 0.60mx0.60m


(medidas interiores) (con altura variable), con bloques 6"
12.16 10.00 UD 0.00
(industrial), losa de fondo, incluye pañete interior pulido
(fondo y muros) y tapa en hormigon aramado

F Ventilaciones 0.00
12.17 Ventilación de ø3" PVC SDR-41 5.00 UD 0.00
G Misceláneos 0.00
Suministro y colocación de tinacos de 530 gal. (incluye
12.18 2.00 UD 0.00
tuberías, piezas y mano de obra)

Corte con pulidora, ranura, perforaciones, anclaje c/


12.19 5.00 U 0.00
varillas, repello y terminación p/ colocación de ventilación

Suministro e instalación de equipo de bombeo para agua


potable: 32 GPM vs 82 pies TDH, 2 HP. Incluye
12.20 dispositivos y accesorios en succión desde cisterna e 1.00 U 0.00
impulsión en cuarto de equipos. Totalmente instalado,
(arrancador, switch, manómetro)

Suministro e instalación de tanque hidroneumático 42 gls.


12.21 1.00 U 0.00
Incluye todos los accesorios.

13.00 Topes y/o Gabinetes en Acero Inoxidable 0.00

Suministro y colocación de mueble en acero inoxidable


(tope y gabinete de piso) grado 316 (1.85x0.60)m, una
poceta con respaldo en acero inoxidable, sin pocetas,
13.01 moldeado en una sola pieza sin juntas ni fisuras, 1.00 UD 0.00
postformado, doble bullnose, puertas con marcos dobles en
doble tola de acero inoxidable, tiradores rectos en acero
inoxidable. en trabajo Esteril

Suministro y colocación de mueble en acero inoxidable


(tope y gabinete de piso) grado 316 (1.85x0.60)m, una
poceta con respaldo en acero inoxidable, sin pocetas,
13.02 moldeado en una sola pieza sin juntas ni fisuras, 1.00 UD 0.00
postformado, doble bullnose, puertas con marcos dobles en
doble tola de acero inoxidable, tiradores rectos en acero
inoxidable.En trabajo no esteril
Suministro y colocación de gabinete de pared en acero
inoxidable grado 316, calibre 18, moldeado en una sola
13.03 pieza sin juntas ni fisuras, postformado, doble bullnose, 3.70 m 0.00
puertas con marcos reforzados en doble tola de acero
inoxidable, tiradores rectos en acero inoxidable

Construcción de base de hormigón armado con malla


13.04 2.22 m² 0.00
electrosoldada p/gabinetes de piso, e=0.10m

14.00 Cortinas Hospitalarias 0.00

Cortinas hospitalaria para formar cubículos tipo Oxford,


antibacterial y antialergénicas, antihongos y antiacaros,
resistente a las manchas, antiestática, libre de olores, color
gris (deslizables sobre rieles, con malla en la parte superior,
14.01 4.00 UD 0.00
retardadora de fuego, lavable y de planchado duradero)
Cortina curva (Certificación NFPA 70) Riel de aluminio
ancho 3.2cm / alto 2.9cm / grosor 1.3mm. Longitud minima
de 4.00m

15.00 Topes de Granito 0.00

Suministro y colocación tope en granito natural (gris claro o


15.01 1.50 m² 0.00
blanco), con terminación doble bullnose (incluye soporte)

Muros counter completo (excavación, zapatas, bloques,


15.02 relleno de reposición, pañete, cantos, pintura) (ver planos) 1.20 UD 0.00
en estacion de enfermeria

16.00 Rótulos 0.00

Suministro y colocación rotulación 35cmx10cm en acrílico


transparente 3mm con vinil impreso en espejo, con base en
16.01 10.00 UD 0.00
vinil blanco (para contraste) y adosado a pared con tornillos
decorativos de 1/4"

Suministro y colocación rotulación 70cmx30cm en acrílico


transparente 3mm con vinil impreso en espejo, con base en
16.02 9.00 UD 0.00
vinil blanco (para contraste) y adosado a pared con
tornillos decorativos de 1/4"

Suministro y colocación rotulación 70cmx30cm en acrílico


16.03 transparente 3mm con vinil impreso en espejo, con base en 5.00 UD 0.00
vinil blanco (para contraste), colgante con cable de acero

Suministro y colocación rotulación en celtex de 3mm, con


16.04 7.00 UD 0.00
diseño en vinyl autoadhesivo ploteado. Medidas: 20x20 cm.

Suministro y colocación rotulación en celtex de 3mm, con


16.05 5.00 UD 0.00
diseño en vinyl autoadhesivo ploteado. Medidas: 10x10 cm.

Suministro y colocación rotulación 120cmx86cm en


acrílico transparente 3mm con vinil impreso en espejo, con
16.06 1.00 UD 0.00
base en vinil blanco (para contraste) y adosado a pared con
6 tornillos decorativos de 1/4"

Suministro y colocación de letrero en acrílico 3D, letras


16.07 independientes, volumétricas de acrílico rojo de 3mm con 1.00 UD 0.00
luces LED, de h=12" (EMERGENCIA)

Señalización ruta de evacuación, letreros en Sintra y vinil


16.08 10.00 UD 0.00
(8"x 8"), reflectivo, espesor 6mm

Imágenes ilustrativas en vinyl, a todo color, sobre acrílico


16.09 de 5mm con base blanca y fijado con tornillos decorativos. 10.00 UD 0.00
Dimensiones: 24"x36"
Imágenes ilustrativas en vinyl, a todo color, sobre acrílico
16.10 de 5mm con base blanca y fijado con tornillos decorativos. 10.00 UD 0.00
Dimensiones: 36"x36"

Imágenes ilustrativas en vinyl, a todo color, sobre acrílico


16.11 de 5mm con base blanca y fijado con tornillos decorativos. 10.00 UD 0.00
Dimensiones: 36"x24"

17.00 Barras de Seguridad 0.00

Barras de apoyo pared-piso en acero inoxidable grado 304


17.01 de 1-1/2", en forma de L, longitud de 0.75m, h=0.75m, con 1.00 UD 0.00
cubrefalta en las bases de 3"

Barra de apoyo abatible en acero inoxidable grado 304 de 1


17.02 1/4", longitud de 0.75m, de giro vertical, con base 1.00 UD 0.00
atornillable en muro (0.10mx0.25m)

Barra de apoyo en acero inoxidable grado 304, inclinada en


17.03 1.00 UD 0.00
ducha, con cubre falta en las bases de 3"

Barra de apoyo en acero inoxidable grado 304, recta de


17.04 1.00 UD 0.00
45cm, con cubrefalta en las bases de 3"

18.00 Herrería 0.00

Escalera tipo gato: en tubular de 1 1/2", en hierro


galvanizado, totalmente construida e instalada (incluye
18.01 baranda de llegada), fijación en base, muro y techo, 1.00 UD 0.00
terminación en pintura esmalte blanco. Altura piso-
antepecho=3.90m

19.00 Sistema Contra Incendios 0.00

Suministro y colocación de extintor tipo ABC químico seco


19.01 2.00 U 0.00
de 9kg (incluye gabinete y rótulos: flecha e instrucciones)

Suministro y colocación de extintor de CO2 de 9kg (incluye


19.02 1.00 U 0.00
rótulos: flecha e instrucciones)

20.00 OTRAS INSTALACIONES 0.00


CONSTRUCCION MARQUESINA AMBULANCIA
A Preliminar: 0.00
20.01 Replanteo con charrancha. 87.00 M2 0.00
20.02 Demolición de contén 55.00 m 0.00
20.03 Corte con sierra en asfalto y concreto 55.00 m 0.00
20.04 Demolición de asfalto 12.45 m2 0.00

20.05 Acarreo de bote material (incluye traslado y carguío) 27.54 m3e 0.00

B Movimiento de Tierra: 0.00


Excavación p/ elementos estructurales (incluye acopio de
20.06 22.00 M3 0.00
material).

20.07 Relleno de reposición compactado (con medio mecánicos). 12.08 M3 0.00

20.08 Bote material inservible (incluye traslado y carguío) 9.92 M3 0.00

C Hormigón Armado B.N.P: 0.00

Zapata de columnas C1 (1.60mx1.40mx0.45m) (Acero


20.09 inferior: 1/2"@0.15m A.D.) (Hormigón Industrial 4.43 M3 0.00
280kg/cm2).

Zapatas de muros 15cm (0.45mx0.25m), acero long.


20.10 1.65 m3 0.00
3ø3/8", ø3/8"@0.25m (Hormigón Industrial 280kg/cm2).

Viga riostra (0.15mx0.25m) (4 Ø de 3/8" y est. 3/8"


20.11 0.65 M3 0.00
@0.20m (Hormigón Industrial 280kg/cm2).
Pavimento en hormigón hidráulico en área de marquesina y
acceso con terminación en estampado tipo madera con
20.12 color, e=0.15m, armado con acero 3/8"@0.20m (Hormigón 34.10 M2 0.00
210kg/cm2). (incluye capa protectora de sealer acabado
brilloso y corte en concreto para juntas)

D Hormigón Armado S.N.P: 0.00


Columna C2-Marq (0.30mx0.40m) (6 ø de 3/4") (6 ø de
20.13 1/2") est, de ø 3/8" @ 0.20m (Hormigón Industrial 2.53 M3 0.00
280kg/cm2).

Viga V4-Marq (0.20mx0.40m) (acero inferior: 2 de 3/4")


20.14 (acero superior: 2 de 1/2") (acero inferior: 2 de 3/84") (est. 1.43 M3 0.00
3/8"@0.20m) (Hormigón Industrial 280kg/cm2)

Losa en hormigon armado (Hormigon Industrial


20.15 4.70 M3 0.00
280kg/cm2) (ver planos). H=0.15 m
E Muros: 0.00
Construcción de muros de bloques de hormigón de 6"
20.16 (industrial), bastones ø3/8"@0.40m (con todos los huecos 7.92 m² 0.00
llenos)

20.17 Muros de bloques de hormigón de 6" (en antepecho). 8.48 M2 0.00

F Terminación de Superficies: 0.00


20.18 Fraguache. 66.00 M2 0.00
Pañete maestreado en muros, vigas y columnas (con
20.19 mortero seco premezclado de agregados de granulometría 82.50 M2 0.00
controlada).
20.20 Pañete maestreado techo (con mortero 1:4). 35.20 M2 0.00
20.21 Cantos. 167.75 M 0.00
20.22 Gotero colgante. 24.75 M 0.00
G Pintura: 0.00

Imprimador acrílico de alto desempeño, 100% látex


20.23 acrílico, resistente a la alcalinidad y a la eflorescencia (capa 143.00 M2 0.00
base, una mano). Incluye preparación de superficie.

Suministro y aplicación de pintura acrílica en interiores,


20.24 calidad superior (dos capas) (incluye preparación de 35.20 m2 0.00
superficie) (para techos)

20.24 Pintura acrílica en exteriores, calidad superior (dos capas). 143.00 M2 0.00

21.00 READECUACION AREA EXISTENTE 0.00


A Preliminares 0.00
21.01 Desmonte de puertas, considerar bote 10.00 ud 0.00
21.02 Desmonte de aparatos sanitarios, considerar bote 10.00 ud 0.00
21.03 Desmonte de ventanas, considerar bote 225.95 p2 0.00
21.04 Demolicon de ceramicas en baños 20.00 m2 0.00
21.05 Demolicion de muros internos 71.38 m2 0.00

21.06 Demolición de pisos y zócalos (incluye mortero) 168.84 m2 0.00

21.07 Bote producto de demoliciones 50.17 m3 0.00


B Construcción Muros nuevos 0.00
Excavación de material (incluye acopio de material) (a
21.08 8.12 m3 0.00
mano)
21.09 Relleno de reposicion 3.15 m3 0.00
21.10 bote de material 3.67 m3 0.00

Zapatas de muros 45cm (0.45mx0.25m), acero long


21.11 superior . 3ø3/8" y acero long inferior estribos 3.38 m3 0.00
ø3/8"@0.25m (Hormigón Industrial 210kg/cm2).

Construcción de muros de bloques de hormigón de 6"


21.12 (industrial), bastones ø3/8"@0.40m (con todos los huecos 106.85 m2 0.00
llenos)

Construccion de viga de amarre bajo nivel de piso, de


21.13 hormigon armado, (0.15mx0.20m) (4 ø 3/8" estribo ø 1.02 m3 0.00
3/8@0.25cm), acero grado 60, con bastones
Dintel (acero inferior 3 de 1/2") (acero superior 2 de 3/8")
21.14 0.90 m3 0.00
(estribos 3/8"@0.20m) (Hormigón 210kg/cm2).

Cierre de huecos en blocks 6", Ø3/8" @ 0.60 m & anclaje


21.15 18.77 m2 0.00
epóxico
C Terminación de Superficies 0.00

Pañete maestreado en muros exteriores (con mortero seco


21.16 125.00 m2 0.00
premezclado de agregados de granulometría controlada)

Pañete maestreado en muros interiores (con mortero seco


21.17 premezclado de agregados de granulometría controlada) 205.28 m2 0.00
(incluye mochetas) (incluye mochetas)

21.18 Cantos 125.15 m 0.00


21.19 Pañete de mochetas (con mortero 1:4) 65.30 m 0.00
D Terminación de Pisos 0.00

Suministro y colocación de baldosas de granito para pisos,


21.20 fondo blanco (0.40mx0.40m), derretido de cemento blanco, 185.00 M2 0.00
(pulido, brillado y cristalizado); juntas de 2mm.

Suministro y colocación de zócalos de granito, fondo


21.21 blanco (0.40mx0.07m) con cemento blanco, cristalizado; 151.78 ML 0.00
juntas de 2mm

Suministro y colocación piso de cerámica de alto tránsito,


21.22 antideslizante, todo masa, espesor 8mm, formato 15.00 M2 0.00
0.40mx0.40m, rectificada.

Losa de piso e=0.10m armado con malla electrosoldada


21.23 15x15 (hormigón industrial 210kg/cm2) (incluye 185.00 M2 0.00
separadores).
E Revestimientos 0.00
Suministro y colocación revestimiento de cerámica
21.24 (0.30mx0.60m), color gris claro, rectificada (colocación 42.50 M2 0.00
junta trabada).

Suministro y colocación de cantos plástico (color semejante


21.25 25.00 ML 0.00
a cerámica) en esquinas cerámicas.

F Pinturas 0.00

Imprimador acrílico de alto desempeño, 100% látex


21.26 acrílico, resistente a la alcalinidad y a la eflorescencia (capa 646.87 m2 0.00
base, una mano). Incluye preparación de superficie.

Suministro y aplicación de masillado de muros y techos con


21.27 masilla resistente a la humedad (incluye preparación de 646.87 m2 0.00
superficie)

Pintura acrílica en exteriores, calidad superior (dos capas)


21.28 140.00 m2 0.00
(incluye preparación de superficie)

Suministro y aplicación de pintura hospitalaria antibacterial


y antimicrobiana, acabado semigloss, calidad superior (dos
21.29 646.87 m2 0.00
capas) (incluye preparación de superficie) (autoprimer y
pintura) (99.9% de efectividad) incliuye techos

G Puertas & Ventanas 0.00

Suministro e instalación de puerta (1.20x2.10)m de acero


inoxidable grado 316, calibre 19, satinada, cerradura de
acero inoxidable, con visor en vidrio laminado de seguridad
21.30 de 6mm 0.20mx0.55m, reforzada en área de choque de 1.00 UD 0.00
camillas, con placa de empuje, instalada con cierre oculto
en marco superior europea/americana y pivot en piso, con
cierre hermético y felpa, garantía de 5 años
Suministro e instalación de puerta doble (2.00x2.10)m de
acero inoxidable grado 316, calibre 19, satinada, cerradura
de acero inoxidable, con visor en vidrio laminado de
21.31 seguridad de 6mm 0.20mx0.55m, reforzada en área de 1.00 UD 0.00
choque de camillas, con placa de empuje, instalada con
cierre oculto en marco superior europea/americana y pivot
en piso, con cierre hermético y felpa, garantía de 5 años

Suministro e instalación de puerta plomada (1.20x2.10)m


de acero inoxidable grado 316, 1/32", satinada, cerradura de
21.32 acero inoxidable, instalada con tres bisagras de acero 1.00 UD 0.00
inoxidable por hoja, con cierre hermético, lamina de plomo
de 2mm, garantía de 5 años

Suministro e instalación de puerta doble (1.70 x2.10)m,


marco de aluminio P40, parte inferior en acero inoxidable
21.33 grado 316 de 1/16", y parte superior en vidrio laminado de 1.00 UD 0.00
seguridad de 6 mm, con cerradura de acero inoxidable, con
barra de empuje en aluminio, garantía de 5 años

Suministro e instalación de puerta doble (2.00 x2.10)m,


marco de aluminio P40, parte inferior en acero inoxidable
21.34 grado 316 de 1/16", y parte superior en vidrio laminado de 1.00 UD 0.00
seguridad de 6 mm, con cerradura de acero inoxidable, con
barra de empuje en aluminio, garantía de 5 años

Suministro e instalación de puerta (1.20x2.10)m, marco de


aluminio P40, parte inferior en acero inoxidable grado 316
21.35 de 1/16", y parte superior en vidrio laminado de seguridad 5.00 UD 0.00
de 6 mm, con cerradura de acero inoxidable, con barra de
empuje en aluminio, garantía de 5 años

Suministro e instalación de puerta de 0.70m@1.00m


x2.10m, marco de aluminio P40, parte inferior y superior en
21.36 vidrio laminado de seguridad de 6 mm, con cerradura de 1.00 UD 0.00
acero inoxidable, con barra de empuje en aluminio, garantía
de 5 años (P3)

Suministro e instalación puerta de polimetal (P-4) de 0.70m


hasta 1.00m de ancho, con 2.10m de altura, lisa color
blanco, llavín tipo palanca de acero inoxidable, con rejilla
21.37 2.00 UD 0.00
para ventilación 0.30mx0.30m (ambos lados de puerta),
con brazo hidráulico en cada hoja y tope fijo en puerta
garantía de 5 años

Suministro y colocación ventana combinada vidrio fijo y


21.38 ventana proyectada de aluminio P40 con laminado de 96.41 p2 0.00
seguridad, espesor de 6 mm (V-5). Marcos color blanco.

Suministro e instalación de vidrio fijo en aluminio P-92,


21.39 con marcos de aluminio de 1 1/2, vidrio con laminado de 82.64 p2 0.00
seguridad de 6mm, marcos color blanco (V-04)

Suministro e instalación de ventana corredera en aluminio


P-92, con marcos de aluminio de 1 1/2, vidrio con laminado
21.40 129.54 P2 0.00
de seguridad de 6mm y operadores de palanca en los
extremos, marcos color blanco

Suministro y colocación de laminado de protección solar en


21.41 ventanas (transmisión de luz visible 5%) (medidas por áreas 308.59 P2 0.00
de vidrio en ventanas)
H Instalación Sanitaria 0.00

Suministro e instalación lavamanos de porcelana sanitaria


antibacterial completo, con pedestal, tamaño de mínimo de
21.42 54cmx47cm, con mezcladora push temporizado (de latón 3.00 UD 0.00
cromado, resistente a corrosión) (cierre 15±5s, caudal: 6
l/min regulable) incluye salidas de agua potable y drenaje,

Suministro e instalación de inodoro elongado de porcelana


sanitaria antibacterial completo, one piece de tanque,
pulsador palanca, tamaño mínimo (76x44x75)cm de bajo
21.43 2.00 UD 0.00
consumo y que cumplan con los requerimientos para
accesibilidad, color blanco, c/asiento y tapa, incluye salida
de agua y de drenaje

Suministro e instalación de desagüe de piso Ø2", PVC SDR


21.44 41, rejilla acero inoxidable (cuadrada 4"x4"), sifonada 2.00 UD 0.00
(completa)
Salida agua potable y desagüe p/meseta en acero inoxidable
21.45 2.00 U 0.00
con fregadero

Suministro e instalación de cambiador de bebé. Plataforma


abatible de polietileno de alta densidad y resistencia. Gran
resistencia a impactos, olores y bacterias. Incorpora
21.46 2.00 UD 0.00
cinturón de seguridad para sujetar al bebé, ajustable
fácilmente con una sola mano. Color gris claro. Con
cavidad para stockar toallas limpias.

Suministro e instalación de papelera o zafacón en acero


inoxidable, accionado de pedal abierto y cierre suave
integrado, de metal con tapa. Extraíble forro interior de
21.47 2.00 UD 0.00
plástico recoge las fugas y derrames y protege el basura
bolsas de roturas. Funcionamiento silencioso y sistema de
amortiguador reduce el ruido. Capacidad 20 lts

Suministro e instalación de espejo, de 1/4" de espesor con


los contornos biselados con distanciadores en acero
inoxidables de 1/2" en la parte inferior y de 1" en la parte
21.48 2.00 UD 0.00
superior para proporcionar una inclinación que permita
visibilidad para pacientes en silla de ruedas dimensiones:
18" x 36" (46 x 91 cm) ancho y alto.

Suministro e instalación dispensador combi/mixto de rollo


o toalla zig-zag. Fabricado en plástico, color blanco de alta
calidad y resistencia. Cerradura con llave y opción
rollo/bobina o toalla zig-zag. Poco voluminoso y fijado a
21.49 pared mediante tacos y tornillos. Admite 1 Rollo de Papel 2.00 UD 0.00
continuo o anchura 240 mm y Ø 130 mm máximo o 400
toallas de papel tipo Z. Recarga rápida y fácil tanto de
rollo/bobina como de toallas. Fácil mantenimiento y
limpieza.

Jabonera en plástico color blanco p/lavamanos, empotrada


21.50 2.00 UD 0.00
en muro
Dispensador de jabón liquido, de plástico, de 800ml,
21.51 2.00 UD 0.00
empotrada en muro
Secador de manos, secado rápido en acero inoxidable,
21.52 manos libres automático infrarrojo / 1800w /motor con 1.00 UD 0.00
escobillas/ luz led
Suministro e instalación de porta papeles rollo en continuo.
Fabricado en plástico color blanco de alta calidad.
Cerradura con llave y visor de control de carga.
21.53 Capacidad rollos de hasta 300m con diámetro máximo de 2.00 UD 0.00
220 mm. y para rollos con mandril de 45 mm. de diámetro.
Fácil limpieza y reposición del rollo. Robusto, resistente y
de larga duración. Apertura batiente frontal.

I Topes y/o Gabinetes en Acero Inoxidable 0.00

Suministro y colocación de mueble en acero inoxidable


(tope y gabinete de piso) grado 316 (1.35x0.60)m, una
poceta con respaldo en acero inoxidable, sin pocetas,
21.54 moldeado en una sola pieza sin juntas ni fisuras, 1.00 ud 0.00
postformado, doble bullnose, puertas con marcos dobles en
doble tola de acero inoxidable, tiradores rectos en acero
inoxidable. cura

Suministro y colocación de mueble en acero inoxidable


(tope y gabinete de piso) grado 316 (1.35x0.60)m, una
poceta con respaldo en acero inoxidable, sin pocetas,
21.55 moldeado en una sola pieza sin juntas ni fisuras, 1.00 ud 0.00
postformado, doble bullnose, puertas con marcos dobles en
doble tola de acero inoxidable, tiradores rectos en acero
inoxidable. yeso

Suministro y colocación de mueble en acero inoxidable


(tope y gabinete de piso) grado 316 (1.35x0.60)m, una
poceta con respaldo en acero inoxidable, sin pocetas,
21.56 moldeado en una sola pieza sin juntas ni fisuras, 1.00 ud 0.00
postformado, doble bullnose, puertas con marcos dobles en
doble tola de acero inoxidable, tiradores rectos en acero
inoxidable. medicaicion

Suministro y colocación de gabinete de pared en acero


inoxidable grado 316, calibre 18, moldeado en una sola
21.57 pieza sin juntas ni fisuras, postformado, doble bullnose, 4.20 m 0.00
puertas con marcos reforzados en doble tola de acero
inoxidable, tiradores rectos en acero inoxidable

Construcción de base de hormigón armado con malla


21.58 2.43 m² 0.00
electrosoldada p/gabinetes de piso, e=0.10m

J Cortinas Hospitalarias 0.00

Cortinas hospitalaria para formar cubículos tipo Oxford,


antibacterial y antialergénicas, antihongos y antiacaros,
resistente a las manchas, antiestática, libre de olores, color
gris (deslizables sobre rieles, con malla en la parte superior,
21.59 2.00 UD 0.00
retardadora de fuego, lavable y de planchado duradero)
Cortina recta (Certificación NFPA 70) Riel de aluminio
ancho 3.2cm / alto 2.9cm / grosor 1.3mm. Longitud minima
de 2.00m

K Barras de Seguridad 0.00

Barras de apoyo pared-piso en acero inoxidable grado 304


21.60 de 1-1/2", en forma de L, longitud de 0.75m, h=0.75m, con 2.00 UD 0.00
cubre falta en las bases de 3"

Barra de apoyo abatible en acero inoxidable grado 304 de 1


21.61 1/4", longitud de 0.75m, de giro vertical, con base 2.00 UD 0.00
atornillable en muro (0.10mx0.25m)
Barra de apoyo en acero inoxidable grado 304, inclinada en
21.62 2.00 UD 0.00
ducha, con cubre falta en las bases de 3"

Barra de apoyo en acero inoxidable grado 304, recta de


21.63 2.00 UD 0.00
45cm, con cubre falta en las bases de 3"

L Protección de paredes 0.00

Suministro e instalación de esquinero (retenedor en vinil)


21.64 con cover de vinyl y tapa superior e inferior, color gris 68.00 U 0.00
oscuro, 2"x2" h=1.80m

Suministro e instalación bumpers tipo pasamanos protector


de pared de 5 1/2". Perfil de aluminio firme continuo,
21.65 110.00 P 0.00
parachoque continuo y cubiertas de vinyl rígido resistentes
a los rayones y a las manchas. (Ver detalles)

21.66 Suministro e instalación de terminales para bumpers 12.00 U 0.00

M Construcción Counter en Información y Admisión 0.00

Muros de bloques de hormigón de 6", bastones


21.67 3.30 m2 0.00
ø3/8"@0.40m. (todos los huecos llenos) con resina epoxica

Pañete en muros interiores maestreado y a plomo (incluye


21.68 5.25 m2 0.00
mochetas)
Cantos (con mortero seco premezclado de agregados de
21.69 3.69 m 0.00
granulometría controlada)

Tope en granito natural fondo gris oscuro, con terminación


21.70 3.00 m2 0.00
doble redondeada (incluye soporte)

suministro y colocacion de vidrio fijo (tubos de acero


21.71 25.00 p2 0.00
inoxidable de 1 1/2 x 1 1/2y conectores media luna )6mm

22.00 Terminación de Techos Exterior 0.00


22.01 Remoción de lonas asfáltica, considerar bote 297.00 m² 0.00

Demolición de fino y zabaletas (considerar espesor


22.02 265.75 m² 0.00
promedio de 10cm) (incluye bajar y acarrear el material)

22.03 Bote de material demolido. 39.86 M3E 0.00


Desmonte y reinstalación de compresores de aires
22.04 5.00 UD 0.00
acondicionados

Desinstalación, limpieza y reinstalación de tinacos,


22.05 considere cambios de piezas en salida en PVC, cambio de 2.00 UD 0.00
flota, checker de 1"

Suministro y aplicación de lechada de cemento gris (pre y/o


22.06 265.75 m² 0.00
post construcción de fino)

Construcción de fino en techo plano (con mortero 1:3)


22.07 (espesor promedio de 10cm) (con pendiente hacia 265.75 m² 0.00
desagües) semipulido con helicóptero.

22.08 Zabaleta de techo (con mortero 1:3) (0.15mx0.10m) 88.00 m 0.00

Construcción de base p/ compresores de A/A (dimensiones


1.00x1.20x0.10m) en hormigón armado f´c=180kg/cm2 con
22.09 15.00 UD 0.00
malla electrosoldada 15x15 (incluye zabaleta en perímetro
de base).

Construcción de base p/ tinaco (2.00mx2.00mx0.1m)en


22.10 hormigón armado f´c=180kg/cm2 con malla electrosoldada 2.00 UD 0.00
15x15 (incluye zabaleta en perímetro de base).

22.11 Construcción de juntas (sellado con poliuretano) e=4" 120.00 M 0.00

22.12 Cubrefalta de aluminio para junta 120.00 M 0.00


Construcción de protector de junta en techo (incluyendo
22.13 bloques, terminación, Zabaleta, hormigón, placa 20.00 M 0.00
galvanizada, cantos) (ver planos)

Suministro y colocación de impermeabilizante de techo con


lona asfáltica granulada de 5 kg/cm2 (procedencia
europea), (a ser colocado toda la membrana adherida a la
superficie, sin arrugas, con imprimación a dos manos de
22.14 emulsiones asfálticas de calidad superior, con solapes de 10 325.00 m² 0.00
cm en las uniones completa, con el selle del borde del
solape), debe incluir prueba de estanqueidad para todas las
áreas impermeabilizadas, incluye limpieza de superficie,
garantía de diez años.

23.00 AREAS EXTERIORES 0.00

Construcción de acera en hormigón armado con malla


23.01 electrosoldada , D2.3 x 2.3 10x10CMS, H.I. 180 Kg/cm2 120.00 M2 0.00
(frotada y violinada).

Rampa Personas Con Discapacidad. Construcción área


de descanso (1.80x3.30) mts y construcción rampa de
minusválidos para una pendiente de 8% y L= 10 mts, divida
de en dos tramos. inc. replanteo y marcado, inc. excavación
en tierra, relleno de reposición, zapata de muros
23.02 (0.45x0.25) mts, dos (2) líneas de blocks 6", fraguache, 1.00 ud 0.00
pañete liso en muros b.n.p., cantos, rampa de hormigón
(e=0.10 mts), 180 kg/cm2 (ligadora), malla electrosoldada
D2.3x2.3 20x20, terminación frotada, recolección y
traslado de escombros en carretillas hasta punto de bote,
limpieza, herramientas y mano de obra.

Suministro e instalación de baldosas de vibrazo para pisos,


23.03 50.00 m2 0.00
(0.40mx0.40m), derretido, juntas de 2mm.

sum inistro y colocacion de pasamanos de acero inoxidable


23.04 15.00 m 0.00
en rampa

Suministro y colocación de señalización vertical


23.05 10.00 UD 0.00
0.40mx0.60m (incluyendo base y fijación mediante pernos).

Señalización horizontal parqueo con pintura de trafico


23.06 200.00 m 0.00
(blanca/amarilla)
24.00 Paisajismo 0.00
24.01 Tierra negra (suministro, transporte y regado) 5.20 m³ 0.00

Suministro y colocación grama enana (incluyendo


24.02 50.00 m² 0.00
mantenimiento hasta recepción)

24.03 Tu y Yo (de funda mediana) 17.00 UD 0.00


24.04 Arbolitos chinos 100.00 UD 0.00
24.05 Arrayan (tres bolas) 15.00 UD 0.00
24.06 Cyca revoluta 5.00 UD 0.00
24.07 Palma areca de 5' 9.00 UD 0.00
24.08 Trinitaria (funda mediana) 5.00 UD 0.00
24.09 Gravilla blanca decorativa, e=5 cms 100.00 m² 0.00
25.00 Misceláneos 0.00
Suministro y colocación de paragomas de hormigón
25.01 (incluye fijación, terminación y pintura). 12.00 cm x 2.00 14.00 UD 0.00
m.
25.02 Limpieza continua y final 1.00 P.A. 0.00

Suministro e instalación de equipos de protección colectiva


(delimitaciones, mallas plásticas, señalizaciones de
25.03 1.00 UD 0.00
seguridad), incluye equipos de protección personal, de
acuerdo con reglamento 522-06
26.00 INSTALACIONES ELÉCTRICAS 0.00
A Media Tensión 0.00
Suministro e instalación de Estructura LB608 - Norma
26.001 1.00 UD 0.00
DECON

Suministro e instalación de Estructura PR-202 (Montaje de


26.002 base para seccionador fusible y pararrayos - fijación en 1.00 UD 0.00
cruceta) Norma DECON

Suministro e izaje de HPV-40-500 (Poste de hormigón


26.003 2.00 UD 0.00
pretensado vibrado de 40 pies y 500 daN)

26.004 Excavacion para poste de media tensión 2.00 UD 0.00


26.005 PR-101 (Puesta a tierra interior para poste) 1.00 UD 0.00
26.006 Cimentación de poste 2.00 UD 0.00

Bajada y subida de acometida de media tensión, Inlcuye:


02 - Conectores recto PVC de 3"
02 - Condulet 3" para IMC
02 - Curva PVC de 3"
04 - Tubos IMC de 3"
02 - Curva IMC de 3"
02 - Conector HUB de 3"
02 - Coupling IMC de 3"
26.007 1.00 UD 0.00
03 - Cono de alivio completo (con la varilla terminal)
03 - Elbow conector
15 - Abrazadera Unistrut de 3"
02 - Riel chanel de 1/2"
30 - Tornillo cabeza hexagonal 1/4 x 2 " con tarugo y
arandela
01 - Instalacion de terminacion a cable URD
01 - Fijacion de tuberia IMC

26.008 Zanja IC-302 de 1.20m x 0.4m (Incluye tuberia PVC de 3") 100.00 ML 0.00

Conductor URD AWG NO. 2 XLPE al 33%


26.009 984.00 PIES 0.00
(enchaquetado)

Registros manhole (para media tensión), Incluye:


1- Registro manhole de piso 1.20m x 1.20 m x 1.45m
26.010 (terminado dentro) con Tapa de concreto de 1.50m x 1.50m 2.00 UD 0.00
x 0.12m
Gravilla - 0.9 m³

Suministro e instalación de Transformador tipo pad


26.011 mounted de 150kVA, 12.47/7.2kV - 208/120V, delta-delta, 1.00 UD 0.00
radial feed, frente muerto, sumergido en aceite.

Aterrizaje para transformador compuesto por:


4 Varillas de tierra 5/8 x 8
26.012 4 Conectores para varilla de tierra 1.00 UD 0.00
30 pies de alambre desnudo de cobre 7 hilos

B Generador 0.00
Generador Eléctrico de 175kVA-208/120Vac, 60Hz. 3F.
Consumo máximo de combustible de:
- 28 gal/h al 100% de la carga,
- 21 gal/h al 75% de la carga,
- 9.93 gal/h al 50% de la carga.
Gobernador Electrónico, Máxima potencia acústica de
70dB, Grado de protección mecánica del generador IP23,
Regulación de voltaje automática, Distorsión armónica
menor a un 2%, Velocidad de sobregiro 2250 rpm, Banco
de baterias de 12/24 Vdc,
Controlador con protecciones contra:
26.013 - Fallo de arranque 1.00 UD 0.00
- Baja presión de aceite
- Baja tensión de batería
- Baja/alta frecuencia
- Sobregiro
- Alta temperatura de refrigerante
Controlador con medidores de:
- Tension entre lineas
- Tension linea-neutro
- Corrientes/-Frecuencia
- Potencia Aparente, activa y reactiva
- Factor de potencia

Sistema de combustible para Generador de 175kVA, que


incluye:
1-Tanque de combustible de 800 Gls.
1-Tanque de combustible uso diario de 200 Gls. (Generador
175kVA)
26.014 Sistema de llenado automático desde tanque de combustible 1.00 UD 0.00
de 800Gls hasta tanques de combustible de uso diario,
usando: electroválvulas, sensores de nivel y caja de control.
Materiales misceláneos (filtros de línea, tubería HN,
válvulas, codos, niples, mangueras, bomba de combustible
y todo lo necesario para su instalación).

C Sistema de Puesta a Tierra 0.00


26.015 Cable AWG No. 3/0 CU desnudo 300.00 UD 0.00
26.016 Electrodo de Aterrizaje de 5/8" x 8´ 30.00 UD 0.00
26.017 Soldadura exotérmica 30.00 UD 0.00
26.018 Conector de doble ojo # 3/0 AWG 15.00 UD 0.00

26.019 Tornillo de acero inoxidable de 1/2" x 2 1/2" completo 10.00 UD 0.00

Aditivo GEL para mejorar condicion de resistividad del


26.020 30.00 UD 0.00
terreno 25LB
26.021 Barra master ground de 12" x 3" x 1/4" 1.00 UD 0.00
Registro de medición de tierra construido con Tubo PVC de
26.022 10.00 UD 0.00
8" y tapa roscable
26.023 Hoyo de 6" para Electrodo de tierra 10.00 UD 0.00
26.024 Tubo PVC de 3/4" 4.00 UD 0.00

26.025 Excavación en roca de 1 metro cubico con compresor 1.00 UD 0.00

26.026 Curva PVC de 3/4" 10.00 UD 0.00


26.027 Misceláneos de puesta a tierra 1.00 PA 0.00
26.028 Mano de obra instalación de puesta a tierra. 1.00 PA 0.00
D Equipos BT 0.00

Suministro e Instalación de Encloused Breaker de 400


Amperes, trifásico, 120/208Vac. 60Hz. Barra de neutro
26.029 para 100% de la carga. En gabinete Nema 1 pintado con 2.00 UD 0.00
pintura electrostática en polvo, secada en horno a 200
grados Celsius.
Suministro e Instalación de Interruptor de Transferencia
Automática (ITA) con breaker motorizado de 400 Amperes,
trifásico, 120/208Vac., 3Ph. 60Hz. Con barra de Cobre para
26.030 600 Amperes de 1 ½˝ x ¼˝. Barra de neutro para 100% de 1.00 UD 0.00
la Carga. En gabinete Nema 1 pintado con pintura
electrostática en polvo, secada en horno a 200 grados
Celsius.

Suministro e Instalación de Interruptor de Transferencia


Manual (ITM) con breaker de 400 Amperes, trifásico,
120/208Vac., 3Ph. 60Hz. Con barra de Cobre para 600
26.031 Amperes de 1 ½˝ x ¼˝. Barra de neutro para 100% de la 1.00 UD 0.00
Carga. En gabinete Nema 1 pintado con pintura
electrostática en polvo, secada en horno a 200 grados
Celsius.

Suministro e Instalación de Encloused Breaker de 400


Amperes, trifásico, 208/120Vac. 60Hz. En gabinete Nema
3, con tola mínimo 16, pintado con pintura electrostática en
polvo, secada en horno a 200 grados Celsius. Con doble
26.032 1.00 UD 0.00
cierre, dos portacandados con Planchuela de Hierro de 2˝x
3/16˝ con agujero para ⅜˝. Además, con Cerradura de puño
con cierre en tres puntos, con Planchuela de 1˝x 3/16˝.
(Receptáculo móvil)

Suministro e instalación de Panel Board General de 400


Amperes, trifásico, 208/120Vac., 3Ph. 60Hz. Con barra de
Cobre para 600 Amperes de 1 ½˝ x ¼˝. En gabinete Nema 1
pintado con pintura electrostática en polvo, secada en horno
a 200 grados celsius. Compuesto por:
MBP.400A/3,
26.033 1.00 UD 0.00
02 Breakers 170A/3P
02 Breakers 150A/3P
01 Breakers 100A/3P
01 Breakers 70A/3P
05 Breakers 40A/3P
02 Disponible

Suministro e instalación de Panel Board Emergencia Nema


1 de125 Amperes, trifásico, 208/120Vac., 3Ph. 60Hz. Con
barra de Aluminio para 225 Amperes de ¾˝ x ¼˝ y
Planchuela de aluminio de 1˝ x ⅛˝. En gabinete Nema 1
pintado con pintura electrostática en polvo, secada en horno
26.034 1.00 UD 0.00
a 200 grados celsius. Compuesto por:
MBP.125A/3,
01 Breakers 60A/3P
04 Breakers 40A/3P
03 Disponible

E Paneles de Distribución 0.00

PA1-Panel de Iluminación, trifásico, con barras de


26.035 aluminio de 125 amp. De 12 espacios. Compuesto por: 1.00 UD 0.00
10 Breaker 20A/1

PEB1-Panel de Tomacorrientes, trifásico, con barras de


26.036 aluminio de 125 amp. De 18 espacios. Compuesto por: 1.00 UD 0.00
08 Breaker 20A/1

PUPS1-Panel de Tomacorrientes UPS, trifásico, con barras


de aluminio de 125 amp. De 18 espacios. Compuesto por:
26.037 1.00 UD 0.00
12 Breaker 20A/1
01 Breaker 40A/3
PC1-Panel Climatización, trifásico, con barras de aluminio
de 225 amp. De 54 espacios. Compuesto por:
26.038 1.00 UD 0.00
19 Breaker 20A/2
01 Breaker 30A/2

F Alimentadores 0.00

Alimentador desde Transformador pad mounted de


150kVA a Enclosed breaker de transformador a 400A,
compuesto por:
26.039 3 Alambre AWG No. 2/0 THHN por fase 50.00 PIES 0.00
3 Alambre AWG No. 2/0 THHN neutro
1 Alambre AWG No. 1/0 THHN tierra
2 tubería IMC 3".

Alimentador desde Enclosed breaker de transformador a


Interruptor de transferencia automática (ITA), compuesto
por:
26.040 3 Alambre AWG No. 2/0 THHN por fase 30.00 PIES 0.00
3 Alambre AWG No. 2/0 THHN neutro
1 Alambre AWG No. 1/0 THHN tierra
2 tubería IMC 3".

Alimentador desde Interruptor de transferencia automática


(ITA) a Interruptor de transferencia manual (ITM),
compuesto por:
26.041 3 Alambre AWG No. 2/0 THHN por fase 30.00 PIES 0.00
3 Alambre AWG No. 2/0 THHN neutro
1 Alambre AWG No. 1/0 THHN tierra
2 tubería EMT 3".

Alimentador desde Interruptor de transferencia manual


(ITM) a Enclosed breaker de generador, compuesto por:
3 Alambre AWG No. 2/0 THHN por fase
26.042 30.00 PIES 0.00
3 Alambre AWG No. 2/0 THHN neutro
1 Alambre AWG No. 1/0 THHN tierra
2 tubería EMT 3".

Alimentador desde Enclosed breaker de generador a


Generador, compuesto por:
3 Alambre AWG No. 2/0 THHN por fase
26.043 30.00 PIES 0.00
3 Alambre AWG No. 2/0 THHN neutro
1 Alambre AWG No. 1/0 THHN tierra
2 tubería EMT 3".

Alimentador desde Interruptor de transferencia manual


(ITM) a Receptáculo Móvil, compuesto por:
3 Alambre AWG No. 2/0 THHN por fase
26.044 30.00 PIES 0.00
3 Alambre AWG No. 2/0 THHN neutro
1 Alambre AWG No. 1/0 THHN tierra
2 tubería EMT 3".

Alimentador desde Interruptor de transferencia automática


(ITA) a Panel Board de Emergencia, compuesto por:
3 Alambre AWG No. 2/0 THHN por fase
26.045 250.00 PIES 0.00
3 Alambre AWG No. 2/0 THHN neutro
1 Alambre AWG No. 1/0 THHN tierra
2 tubería PVC/EMT 3".

Alimentador desde Panel board de Emergencia a PA Panel


de iluminacion, compuesto por:
1 Alambre AWG No. 8 THHN por fase
26.046 120.00 PIES 0.00
1 Alambre AWG No. 8 THHN para neutro
1 Alambre AWG No. 10 THHN tierra
1 tubería EMT 1".
Alimentador desde Panel board de Emergencia a PB Panel
de Tomacorriente, compuesto por:
1 Alambre AWG No. 8 THHN por fase
26.047 30.00 PIES 0.00
1 Alambre AWG No. 8 THHN para neutro
1 Alambre AWG No. 10 THHN tierra
1 tubería EMT 1".

Alimentador desde Panel Board de Emergencia a Panel de


Climatización, compuesto por:
2 Alambre AWG No. 1/0 THHN por fase
26.048 30.00 PIES 0.00
2 Alambre AWG No. 1/0 THHN neutro
1 Alambre AWG No. 3/0 THHN tierra
1 tubería IMC 2".

Alimentador desde Panel board de Emergencia a PUPS


Panel de tomacorriente de UPS, compuesto por:
1 Alambre AWG No. 8 THHN por fase
26.049 30.00 PIES 0.00
1 Alambre AWG No. 8 THHN para neutro
1 Alambre AWG No. 10 THHN tierra
1 tubería EMT 1".

G Sistema de Alimentación Ininterrumpida (UPS) 0.00

Suministro e instalación de UPS-10 kVA, 208/120Vac.,


(3Ph + N + T), 60Hz, Topología: Doble conversión el línea,
garantía de un año en piezas y servicios. Incluye: Serie de
26.050 1.00 UD 0.00
baterias modulares inteligentes de 7.2Ah internas,
Autonomía: de 15 minutos (minimo) al 100% de la carga.
Incluye instalación, arranque y materiales.

Suministro e instalación de Sistema General de By-Pass


para UPS de 40A/3, 208/120Vac., 3Ph. 60Hz. Nema 1,
incluye:
1 Breaker Normal 40A/3
26.051 1 Breaker Bypass 40A/3 1.00 UD 0.00
1 Breaker UPS 40A/3
2 Luces indicadoras
2 Interruptor frontal
Embarrado y conectores para 100% de la carga.

Alimentador desde Bypass UPS 40A a PUPS-Panel de


Tomacorrientes UPS1 compuesto por:
1 Alambre AWG No. 8 THHN por fase
26.052 30.00 PIES 0.00
1 Alambre AWG No. 8 THHN neutro
1 Alambre AWG No. 10 THHN tierra
1 tubería EMT 1".

H Salidas Eléctricas 0.00

26.053 Salida cenital en tuberia EMT de 3/4" para Luminaria 80.00 UD 0.00

26.054 Salida de pared en tuberia EMT de 3/4" para Luminaria 10.00 UD 0.00

26.055 Bajante de 4' para Luminaria Empotrada 80.00 UD 0.00

Salida para Interruptor Sencillo Aterrizado, 15A, 120V -


26.056 Incluye accesorio Termoplástico con placa frantal sin 10.00 UD 0.00
tornillos con terminación en blanco

Salida para Interruptor Doble Aterrizado 15A, 120V -


26.057 Incluye accesorio Termoplástico con placa frantal sin 2.00 UD 0.00
tornillos con terminación en blanco

Salida para Interruptor Triple Aterrizado 15A, 120V -


26.058 Incluye accesorio Termoplástico con placa frantal sin 1.00 UD 0.00
tornillos con terminación en blanco
Salida para Tomacorriente Doble Aterrizado 15A, 120V -
26.059 Incluye accesorio Termoplástico con placa frantal sin 35.00 UD 0.00
tornillos con terminación en blanco

Salida para Tomacorriente Doble Aterrizado 15A Grado


26.060 Hospitalario, 120V - Incluye accesorio Termoplástico con 15.00 UD 0.00
placa frantal sin tornillos con terminación en blanco

Salida para Tomacorriente Doble Aterrizado 15A para


26.061 UPS, 120V - Incluye accesorio Termoplástico con placa 15.00 UD 0.00
frantal sin tornillos con terminación en naranja

Salida para Tomacorriente Doble Aterrizado 15A Grado


Hospitalario para UPS, 120V - Incluye accesorio
26.062 49.00 UD 0.00
Termoplástico con placa frantal sin tornillos con
terminación en naranja

Salida de extractor de baño de plafón 11"x11" . Incluye


26.063 5.00 UD 0.00
extractor y ventanilla exterior.

Salida para Punto de data, Camara y Control de acceso.


26.064 28.00 UD 0.00
Incluye cable UTP Cat 6 y Faceplate con puerto RJ45.

I Suministro e Instalación 0.00

Suministro e instalación de Lámpara Led Adosada 2x2´


26.065 Tipo Panel Sellado, 48VA, 80-240V, 60Hz, 6000-7000K, 70.00 UD 0.00
lúmenes ≥ 3200, 80RA, IP20.

Suministro e instalación de Lámpara Led empotrada 2x4’


26.066 Tipo Panel Sellado, 62VA, 80-240V, 60HZ, 6000-7000K, 5.00 UD 0.00
lúmenes ≥ 6000 Lum, IRC ≥ 80, IP44.

Suministro e instalación de Downlight Led empotrada


26.067 redonda con 6’’-9’’ de diámetro, 23VA, 120V, 60HZ, 5.00 UD 0.00
6000-7000K, lúmenes ≥ 400 Lum, IRC ≥ 80, IP54.

Suministro e instalación de Lámpara de Emergencia de dos


luces, auto- energizadas (con baterías incorporadas),
26.068 autonomía mínima de dos horas de funcionamiento (120 5.00 UD 0.00
min). 5.4W, 120-277V. Adosada a la pared, a instalar a 20
cm B.N.P.T.

Suministro e instalación de Fotocelda para luminaria


26.069 8.00 UD 0.00
exterior 120V, IP65, 1000W.
J Sistema de Vigilancia IP 0.00
Patch cord cat-6 (cable flexible de alta calidad. Patch cords
26.070 acabados y probados) (aliviador de tensión moldeado en 28.00 UD 0.00
caliente).
26.071 Escalerilla 6" x 10' 1.00 UD 0.00
26.072 Pacht Panel 24 puertos 1.00 UD 0.00
26.073 Organizador 1.00 UD 0.00

NVR de 16 Canales, que soporte hasta 16 cámaras,


compresión H.264, hasta 10 TB de capacidad para cada
HDD, exportación de video AVI/RAW. Resolución
26.074 Máxima Local: hasta 4MP; Remoto: hasta10MP. Zoom 1.00 UD 0.00
digital. Compresión de audio PCM, G.711. Con 2 puerto(s),
USB 2.0. Puerto HDMI (3 años de garantía) (Licencia libre
de 16 canales incluida).

Disco duro 4 TB, Buffer 64MB, Dispositivo compatible:


grabadora de video en red, capacidad de almacenamiento
26.075 4TB, disco duro especial para vigilancia, interfaz de unidad 1.00 UD 0.00
SATA, tamaño de HDD de 3.5". SATA 6.0 Gb/s, velocidad
5400 rpm.
Cámara IP Tipo Bullet, 2 Megapíxel, día/noche con IR
26.076 LED adaptativo hasta 40 metros, lente 2.8mm-12mm, IP66, 5.00 UD 0.00
PoE.

Cámara IP Tipo Domo, 2 Megapíxel, día/noche con IR


26.077 5.00 UD 0.00
LED adaptativo hasta 30 metros, lente 2.8mm-12mm, PoE.

Gabinete 12 U, instalación estándar de 19¨, paneles


26.078 laterales extraíbles, cerraduras laterales, entrada de cable en 1.00 UD 0.00
la cubierta superior y el panel inferior, protección IP20.

Pantalla 32¨, Led, resolución 1080p, entrada HDMI,


26.079 1.00 UD 0.00
entrada VGA.

Switch de 24 puertos, PoE 10/100TX+2 10/100/1000TX


compartidos 2 1000X, administrado, estándar 802,3at/af,
26.080 1.00 UD 0.00
total de PoE 360 vatios, temperatura de funcionamiento 0-
50 ºC.

26.081 Tubería EMT de 1" 1.00 UD 0.00


26.082 Registro NEMA 1 24''x24''x8'' 1.00 UD 0.00
26.083 Registro NEMA 1, 8''x8''x6'' 1.00 UD 0.00
26.084 Abrazadera Unistrut 1" 1.00 UD 0.00
26.085 Soporte Channel Unistrut 3/4" 1.00 UD 0.00
26.086 Barra roscada de 3/8 1.00 UD 0.00
26.087 Fibra Optica 150.00 PIES 0.00

Suministro e instalación de cableado con cable UTP cat 6


26.088 8,000.00 PIES 0.00
(alta calidad hasta punto de salida

26.089 Suministro e instalación de Face plate 60.00 UD 0.00


K Sistema de Control de Acceso 0.00

Sistema de Control de Acceso Empleados, Incluye:


-Reloj Biométrico.
-Nueva generación de sensor: totalmente sellado, aprueba
de polvo, agua y rayones.
-Pantalla LCD 128x64.
26.090 -Formas de identificación: Id, Clave ID + Huella digital. 1.00 UD 0.00
-Capacidad de registro: 50000.
-USB + Puerto USB (memorias USB).
-Batería recargable para emergencias o portabilidad.
-Hasta 2000 huellas digitales.
-Control de acceso para cuatro (4) puertas.

Instalación, configuración y entrenamiento de sistema de


26.091 1.00 PA 0.00
control de acceso.
L Climatización 0.00

Salida eléctrica en alambre No. 10 para alimentación de aire


26.092 8.00 UD 0.00
acondicionado en tuberia IMC/LT de 3/4

Preinstalación y desgue de aire acondicionado, incluye:


2'' de tubería PVC de 2'' para tubería de cobre
2'' de tubería PVC de 3/4'' para alambre de goma
26.093 4'' de tubería PVC de 3/4'' para desague 8.00 UD 0.00
3 curva PVC de 2''
1 curva PVC de 3/4''
3'' alambre de goma 14/3.

Suministro e instalación de Unidad de aire acondicionado


26.094 3.00 UD 0.00
tipo Split Inverter de 12mil BTU SEER +18

Suministro e instalación de Unidad de aire acondicionado


26.095 1.00 UD 0.00
tipo Split Inverter de 18mil BTU SEER +18.

Suministro e instalación de Unidad de aire tipo fan coil de 1


26.096 2.00 UD 0.00
TON.
Suministro e instalación de Unidad de aire tipo fan coil de 4
26.097 2.00 UD 0.00
TON.
26.098 Desconectivo 20A/2 8.00 UD 0.00
Subtotal General RD$0.00

GASTOS INDIRECTOS: $ -
1.00 Dirección Técnica 10.00% -
2.00 ITBIS Norma 07-07 DGII 18.00% -
3.00 Gastos Administrativos 3.00% -
4.00 Transporte 3.00% -
5.00 Seguros y Fianzas 2.50% -
6.00 Pensión y Jubilación 1.00% -
7.00 Codia 0.10% -
Estudios, diseños, gestiones, sometimiento y/o
8.00 2.00% -
tramitaciones.
9.00 Imprevistos 5.00% -
TOTAL GENERAL RD$0.00

Notas Generales:
1 Las cantidades descritas en este presupuesto deben ser validadas en obra por la supervisión y cubicadas de acuerdo a las medidas levantadas en campo.

2 Los precios alzados (PA) serán pagados mediante desglose de partidas, previamente conciliadas con el SNS y/o presentación de facturas.

3 El imprevisto solo podrá ser usado previa autorización por escrito.

El Presupuesto de referencia ha sido preparado por Analistas de Costos de Dirección de Infraestructura y Equipos del SNS, tomando en cuenta los precios vigentes de los materiales
4
y con la mano de obra establecida por el Ministerio de Trabajo.

Tanto los gastos de seguros y fianzas, así como los estudios, diseños, gestiones, sometimientos y/o tramitaciones serán pagadas mediante desglose de partidas y/o presentación de
5
facturas, previamente aprobados por la Dirección de Infraestructura, teniendo como monto máximo el presentado en el presupuesto.

Las partidas contenidas en este presupuesto deben de contemplar, la presencia de un ingeniero o arquitecto residente, de igual manera la seguridad en obra (reglamento 522-06
6
seguridad y salud en obra )* Incluye Botas, Chalecos, arnés, cascos.
7 Todos los botes y partidas que ameriten, deben de considerar el acarreo interno de la obra.