DISEÑO ESTRUCTURAL

CASETA DE CONTROL SUBESTACION AMARILO-EMSA


VILLAVICENCIO-META
TABLA DE CONTENIDO

1 GENERALIDADES.......................................................................................................................... 4
2 PARAMETROS SISMICOS ............................................................................................................. 5
3 NORMATIVA DE DISEÑO ............................................................................................................. 7
4 MATERIALES ................................................................................................................................ 8
4.1 Concreto .............................................................................................................................. 8
4.2 Acero de refuerzo................................................................................................................ 8
4.3 Mampostería ....................................................................................................................... 8
5 EMPALMES Y TRASLAPOS DEL ACERO......................................................................................... 9
6 PREDIMENSIONAMIENTO DE LOS ELEMENTOS ........................................................................ 10
6.1 PREDIMENSIONAMIENTO DE VIGAS SEGÚN NSR-10 ........................................................ 10
7 ANALISIS SISMICO ..................................................................................................................... 11
8 ANALISIS DE VIENTO.................................................................................................................. 15
9 DESCRIPCION DEL SISTEMA DE ENTREPISO .............................................................................. 19
10 AVALUO DE CARGAS.............................................................................................................. 20
10.1 AVALUO DE CARGAS CUBIERTA LIVIANA .......................................................................... 20
7.3 CARGAS SEGÚN NSR10 ............................................................................................................ 21
11 CHEQUEO DE DERIVAS .......................................................................................................... 23
11.1 REPORTE DE DERIVAS ........................................................................................................ 23
12 CHEQUEO DE IRREGULARIDADES.......................................................................................... 24
12.1 IRREGULARIDAD EN ALTURA ............................................................................................. 24
12.2 IRREGULARIDAD EN PLANTA ............................................................................................. 25
12.3 AUSENCIA DE REDUNDANCIA ........................................................................................... 26
13 ESQUEMA DEL MODELO MATEMATICO................................................................................ 27
12. 2 PLANTA DE CIMENTACION ................................................................................................... 27
12.3 PLANTA DE CUBIERTA ........................................................................................................... 27
12.4 VISTA 3D DE MODELO MATEMATICO ................................................................................... 27
12 DISEÑO DE ELEMENTOS ESTRUCTURALES ............................................................................ 28
12.1 DISEÑO DE COLUMNAS ..................................................................................................... 28
12.2 REPORTE DE DEFLEXIONES ................................................................................................ 28
12.3 DISEÑO DE VIGAS AEREAS ................................................................................................. 28
12.4 DISEÑO DE VIGAS DE CIMENTACION ................................................................................ 28
12.5 DISEÑO DE VIGUETAS ........................................................................................................ 28
12.6 DISEÑO DE PLACA DE CONTRAPISO .................................................................................. 29
12.7 DISEÑO DE ZAPATAS ......................................................................................................... 34
12.8 DISEÑO DE VIGAS DE CIMENTACION SEGÚN C.15.13.3 .................................................... 35
12.9 CHEQUEO DE DEFLEXIONES ............................................................................................. 37
12.10 DISEÑO DE CERCHA DE CUBIERTA................................................................................. 38
12.11 VERIFICACION C.21.5.4.1............................................................................................... 45
12.12 VERIFICACION SEGÚN NSR-10 SEGÚN C.21.7.4.1 ........................................................ 46
12.13 VERIFICACION SEGÚN C.21.6.5.1 NSR-10...................................................................... 52
13 ELEMENTOS NO ESTRUCTURALES ......................................................................................... 60
14 DATOS DE ENTRADA .............................................................................................................. 61
15 DATOS DE SALIDA .................................................................................................................. 68
16. . MEMORIAL DE RESPONSABILIDAD ............................................................................................ 90
17. DOCUMENTOS DEL DISEÑADOR ................................................................................................. 91
18. LICENCIA DC-CAD ........................................................................................................................ 93
1 GENERALIDADES

Sistema Estructural Porticos Resistente a Momentos


Zona Sismica Alta
Capacidad de Disipacion DES
Area de la Estructura 182.14 m²
Numero de pisos 2
Uso Residencial
Grupo de Uso IV
Coeficiente de Importancia 1.5
Grado de desempeño Superior
Metodo de Diseño Resistencia Ultima
Tipo de Cimentacion Zapatas Aisaldas
Profundidad de Cimentacion 2
2 PARAMETROS SISMICOS
3 NORMATIVA DE DISEÑO

Normas Colombianas de diseño y construcción sismo resistente. NSR-10, Decreto


926 de Marzo 14 de 2010, Decreto 092 de Enero 17 de 2011 y Decreto 340 de
Febrero 13 de 2012.
4 MATERIALES

4.1 Concreto

El material empleado en el análisis de la edificación corresponde a un concreto de 21


MPa:

𝑓´𝑐 = 21𝑀𝑃𝑎
𝐸 = 3900√𝑓´𝑐
𝐸 = 17.914,55 𝑀𝑃𝑎

4.2 Acero de refuerzo

 Malla Electrosoldada fy= 4200 kg/cm² (420 MPa) NTC-2310


 Acero corrugado Ø 1/4" fy = 2400 kg/cm² (240 MPa)
 y para Ø mayores fy = 4200 kg/cm² (420 MPa) NTC-2289
 Módulo de elasticidad Es = 200.000 MPa

No se permite el uso de acero de refuerzo fabricado bajo la norma NTC 245, ni ningún
otro tipo de acero que haya sido estirado en frio o trefilado.

4.3 Mampostería

 f'cu= 5 MPa
 f'cp= 12.5 MPa
 f'm= 2.7 MPa
 Em= 2045 MPa
5 EMPALMES Y TRASLAPOS DEL ACERO
6 PREDIMENSIONAMIENTO DE LOS ELEMENTOS
6.1 PREDIMENSIONAMIENTO DE VIGAS SEGÚN NSR-10
7 ANALISIS SISMICO
8 ANALISIS DE VIENTO
9 DESCRIPCION DEL SISTEMA DE ENTREPISO
10 AVALUO DE CARGAS
10.1 AVALUO DE CARGAS CUBIERTA LIVIANA

ANALISIS DE CARGAS

CUBIERTA LIVIANA EN FIBROCEMENTO

Area deCubierta 182.14 m²


CARGAS PARTICIPANTES (Ton/m²)
Carga Muerta 0.03 T/m²
Carga Viva 0.05 T/m²
Carga sobreimpuesta 0.05 T/m²
CARGA TOTAL 0.127 T/m²
7.3 CARGAS SEGÚN NSR10
11 CHEQUEO DE DERIVAS
11.1 REPORTE DE DERIVAS
12 CHEQUEO DE IRREGULARIDADES
12.1 IRREGULARIDAD EN ALTURA
12.2 IRREGULARIDAD EN PLANTA
12.3 AUSENCIA DE REDUNDANCIA
13 ESQUEMA DEL MODELO MATEMATICO
12. 2 PLANTA DE CIMENTACION

12.3 PLANTA DE CUBIERTA

12.4 VISTA 3D DE MODELO MATEMATICO


12 DISEÑO DE ELEMENTOS ESTRUCTURALES

Para el diseño de los elementos comprendidos entre los numerales


12.1 y 12.5 se presenta un anexo al final del documento

12.1 DISEÑO DE COLUMNAS


12.2 REPORTE DE DEFLEXIONES
12.3 DISEÑO DE VIGAS AEREAS
12.4 DISEÑO DE VIGAS DE CIMENTACION
12.5 DISEÑO DE VIGUETAS
12.6 DISEÑO DE PLACA DE CONTRAPISO
Con los datos obtenidos del analisis estructural, se considera dimensionar la placa de fondo o contrapiso por
medio de una losa maciza en dos direcciones

Figura. Modelo considerado para el diseño

Ln
Lc

t= h

Ln

Media franja col


Media franja col

Media franja col

Franja central
Lc

Media franja col

CALCULO DE REFUERZOS PLACA


Generalidades
Elementos Rectangulares Todos los ejes
Carga maxima de corte V13 o V23 (KN/m) 271.0 Ver SAP (Elemento 54)
Momento (KN.m/m) 1-1 95.0 Ver SAP (Elemento 49)
Momento (KN.m/m) 2-2 190.0 Ver SAP (Elemento 43)
Momento (KN.m/m) 1-2 30.0 Ver SAP (Elemento 54)
f'c (MPa) 21 Resistencia del concreto mínima

Hacemos un análisis conservador para comparar resultados:

DIMENSIONAMIENTO DE LA PLACA MACIZA C.9.5.3 NSR-97

Espesor de placas macizas en dos direcciones sin vigas interiores NSR-10C.9


Luz mayor entre vigas de carga (m):
Vigas entre apoyos no
Vigas de borde no
Lb (m) 3.00 Lb=Ln: Longitud larga
La (m) 3.00 Con a > 0.8, se aplica la tabla C.9-3

Espesor minimo (m) C.13-C.9.5: (sin ábacos)


L/30 (m) - panel exterior 0.10
L/33 (m) - panel exterior 0.09
L/33 (m) - panel interior 0.09
Espesor minimo (m) C.13-C.9.5: (con ábacos)
L/33 (m) - panel exterior 0.09
L/36 (m) - panel exterior 0.08
L/36 (m) - panel interior 0.08

Tipo y método de diseño Método de los coeficientes


Espesor final asumido (m) 0.15

Carga de peso propio de Placas y estructuras encima (KN/m2)


Peso propio losa 3.60
Piso y alistado 0.11 No se considera alistado
Muros eventuales 1.40
D (Sin carga por muros divisorios) 5.11

Carga viva 1.80


Impacto 10% 0.18
L 1.98
wu (KN/m2) 10.52 Cargas mayoradas

ANALISIS LOSAS EN DOS DIRECCIONES C.13.3 NSR 10


Esfuerzos de flexión:
m (la/lb) 1.00
Caso 2
C a,j - 0.045
C b,j - 0.045

Franjas centrales
Momentos Negativos ABAJO
Ma- (KN.m/m) 4.26
Mb- (KN.m/m) 4.26

Momentos Positivos ARRIBA


C a,j + (L) 0.027
C b,j + (L) 0.027
Ma+ (KN.m/m) - L 0.48
Mb+ (KN.m/m) - L 0.48

C a,j + (D) 0.018


C b,j + (D) 0.018
Ma+ (KN.m/m) - D 0.83
Mb+ (KN.m/m) - D 0.83
Ma+ (KN.m/m) 1.98
Mb+ (KN.m/m) 1.98
Momentos Positivos ABAJO
Fy 420000000
fc 28000000
b 1.00 Analisis por metro cuadrado.
h 0.15
d' 0.05
d 0.10
Mu 4260.60 Nota : Cuando el momento máximo negativo no
f 0.9 implique el cálculo de acero a compresión,
a= 37170000 deberá tenerse en cuenta que son dos
b= 4200000 recubrimientos los que es necesario sustraer.

c= 4734.00
r- 0.001138616
r+ 0.111855734 Utilizar malla 6mmc/15
As (mm/m) 178.00 0.627
fMn max 51916.03
As 1600
a (mm) 28.24
c (mm) 33.22
e's -0.001515625
F's -303125000
fMn1 51916.03 1.60
fMn2 -47655.43 h d
Cs -1059009.60
As' 3493.64
As 2 -2521.45
As t -921.45

Momentos Negativos ARRIBA


Fy 420000000
fc 28000000
b 1.00 Analisis por metro cuadrado.
h 0.15
d' 0.05
d 0.10
Mu 1976.89 Nota : Cuando el momento máximo negativo no
f 0.9 implique el cálculo de acero a compresión,
a= 37170000 deberá tenerse en cuenta que son dos
b= 4200000 recubrimientos los que es necesario sustraer.

c= 2196.54
r 0.000525429 Cuantia minima Zona alta = 0.0021888889
r 0.112468921 Utilizar malla 6mmc/15
As (mm/m) 178.00 0.894
fMn max 51916.03
As 1600
a 28.24
c 33.22
e's -0.001515625
F's -303125000 h
fMn1 51916.03 d 1.12
fMn2 -49939.15
Cs -1109758.80
As' 3661.06
As 2 -2642.28
As t -1042.28
Franjas de columnas
Momentos Negativos ABAJO
Ma- (KN.m/m) 2.84
Mb- (KN.m/m) 2.84

Momentos Positivos ARRIBA


Ma+ (KN.m/m) - L 0.32
Mb+ (KN.m/m) - L 0.32

Ma+ (KN.m/m) - D 0.55


Mb+ (KN.m/m) - D 0.55
Ma+ (KN.m/m) 1.32
Mb+ (KN.m/m) 1.32

Momentos Positivos ABAJO


Fy 420000000
fc 28000000
b 1.00 Analisis por metro cuadrado.
h 0.15
d' 0.05
d 0.10
Mu 2840.40 Nota : Cuando el momento máximo negativo no
f 0.9 implique el cálculo de acero a compresión,
a= 37170000 deberá tenerse en cuenta que son dos
b= 4200000 recubrimientos los que es necesario sustraer.
c= 3156.00
r- 0.000756493
r+ 0.112237857 Utilizar malla 6mmc/15
As (mm/m) 178.00 0.894
fMn max 51916.03
As 1600
a 28.24
c 33.22
e's -0.001515625
F's -303125000
fMn1 51916.03 1.12
h d h
fMn2 -49075.63
Cs -1090569.60
As' 3597.76
As 2 -2596.59
As t -996.59

Momentos Negativos ARRIBA


Fy 420000000
fc 28000000
b 1.00 Analisis por metro cuadrado.
h 0.15
d' 0.05
d 0.10
Mu 1317.92 Nota : Cuando el momento máximo negativo no
f 0.9 implique el cálculo de acero a compresión,
a= 37170000 deberá tenerse en cuenta que son dos
b= 4200000 recubrimientos los que es necesario sustraer.

c= 1464.36
r 0.00034974 Cuantia minima Zona alta = 0.0021888889
r 0.112644611 Utilizar malla 6mmc/15
As (mm/m) 178.00 0.894
fMn max 51916.03
As 1600
a 28.24
c 33.22
e's -0.001515625
F's -303125000 h
fMn1 51916.03 d 1.12
fMn2 -50598.11
Cs -1124402.40
As' 3709.37
As 2 -2677.15
As t -1077.15

Esfuerzo cortantes:
El esfuerzo a cortante tambien sera resistido por el acero que se calcule para la flexión, el cálculo se hace con
base en la tabla C.13.8, para el caso correspondiente
m (la/lb) 1.00
Caso 8
wa 0.5
wb 0.5
Va (KN/m) 7.89
Vb (KN/m) 7.89

Diseño cortante luz mayor:


f'c (MPa) 21.0 Carga por metro cuadrado
bw (m) 1.000
h(m) 0.100
d' 0.05
d 0.05 f 'C
V f bd
vu b (KN/m2) 157.80 6
fvc (KN/m2) 649.20
Vu< fVc OK Criterio para refuerzo de cortante
vu - fvc (KN) -491.40
s (m) d = 3/4" -0.206
s (m) d = 1/2" -0.094
s (m) d = 3/8" -0.052
s (m) d = 1/4" -0.023
s (m) d = 5mm -0.014

Diseño cortante luz menor:


f'c (MPa) 21.0 Carga por metro cuadrado
bw (m) 1.000 Ver Diseño estructural SAP
h(m) 0.100 Columnas
d' 0.05
d 0.05 f 'C
V f bd
vu b (KN/m2) 157.80 6
fvc (KN/m2) 649.20
Vu< fVc OK Criterio para refuerzo de cortante
vu - fvc (KN) -491.40
s (m) d = 6mm 0.150
12.7 DISEÑO DE ZAPATAS
12.8 DISEÑO DE VIGAS DE CIMENTACION SEGÚN C.15.13.3
VIGAS DE AMARRE

1. Se asume una sección: Según la NSR-10 numeral C.15.13.3, las dimensiones de las vigas de amarre deben
establecerse en función de las solicitaciones que las afecten, dentro de las cuales se cuentan la resistencia
a fuerzas axiales por razones sísmicas y la rigidez y características para efectos de diferencias de carga ver-
tical sobre los elementos de cimentación y la posibilidad de ocurrencia de asentamientos totales y diferenciales.

Las vigas de amarre deben tener una sección tal que su mayor dimensión debe ser mayor o igual a L /20 para
estructuras DES, L /30 para estructuras DMO y L /40 para estructuras DMI, donde L es la luz del elemento.

b (cm) = 30
h (cm) = 45
d' (cm) = 7.5
d (cm) = 37.5
d/2 (cm) = 18.75

r = 0.0033 (minimo)

As = rbd
As = 3.71 cm² (Refuerzo positivo)
As = 3.71 cm² (Refuerzo negativo)

2. La viga debe ser capaz de transmitir de columna a columna un porcentaje de la carga que baja por la columna,
dicho porcentaje esta dado por 0.25Aa (Nsr-98 A.3.6.4.2) donde Aa = 0.35 Villavicencio (Zona alta)

0.25 Aa = 8.75%

Máxima carga real que baja por la columna = 64.15 Ton


Factor de carga = 1.3
Carga última = 83.395 Ton

La fuerza axial que debe ser capaz de transmitir la viga de amarre a la columna adyacente (Pu) es:

Pu = 7.3 Ton

El refuerzo que necesita la viga para resistir la fuerza axial es:

fy = 4200 kg/cm²
As = 1.93 cm² (Refuerzo para toda la sección)

3. El momento y el cortante que se generan cuando un elemento de cimentación sufre un asentamiento son:

M= 6EID V= 12EID
L2 L3

Donde :

E = módulo de elasticidad del concreto


f´c = 210 kg/cm²
Ec = 178720 kg/cm²

I = inercia de la sección (la mitad para tener en cuenta la fisuración) : I = bh3/24


I = 0.00114 m4

D = máximo asentamiento permitido para que no se ocasionen daños a elementos importantes.


D = 0.02 m

L = Luz entre columnas


L = 8.70 m
3
I = inercia de la sección (la mitad para tener en cuenta la fisuración) : I = bh /24
4
I = 0.00156 m

D = máximo asentamiento permitido para que no se ocasionen daños a elementos importantes.


D = 0.02 m

L = Luz entre columnas


L = 8.70 m

Luego:

M= 4.4 Ton - m V = 1.0 Ton


Mu = 5.8 Ton - m Vu = 1.3 Ton

Revisión de la sección asumida:

Flexión:

r= 0.0029 Sección asumida es adecuada

As = 3.71 cm² (Refuerzo positivo)


As = 3.71 cm² (Refuerzo negativo)

Cortante: utilizar flejes # 3 ó #4

ø Flejes = 3/8"
# de ramas = 2
As = 1.42 cm²
Separación = 21.25 cm La menor entre d/2 o 30 cm
ø Vc = 8.3 Ton
5ø Vc = 41.6 Ton Sección por cortante OK

Resiste = 18.5 Ton Cortante OK

Resumen dimensionamiento Viga de Amarre

b = 30 cm
h = @REDONDARRIBA(B92/10,0)*2;
50 cm 8; 6
f´c = 210 kg/cm²
fy = 4200 kg/cm²
As = 4.2 cm²
Flejes = 3/8"
Sep máx = 21.25 cm
12.9 CHEQUEO DE DEFLEXIONES
12.10 DISEÑO DE CERCHA DE CUBIERTA
12.11 VERIFICACION C.21.5.4.1
El chequeo de las fuerzas cortantes se realizó con ayuda del programa
DC CAD 2010 el cual de acuerdo a la NSR-10 realizó este chequeo.
12.12 VERIFICACION SEGÚN NSR-10 SEGÚN C.21.7.4.1

Para esta revisión el software RCB simplemente mayora el momento


último de diseño 1.2 veces con el fin de que esta condición se cumpla
satisfactoriamente para todos los elementos portantes del sistema.

De esta forma se puede evidenciar en la revisión de diseño de


elementos estructurales los cuales se encuentran en los datos de
salida del modelo matemático, si el elemento cumple con las
solitaciones respectivas.

De esta forma la anterior verificación se puede realizar


satisfactoriamente ya que al revisar el despiece realizado en el
software DC-CAD comúnmente usado para esta tarea; no es posible
evidenciar el procedimiento que este programa realiza internamente
para este proceso.

Se anexa el memorial del ingeniero Ricardo Barbosa diseñador del


software donde aclara el uso y las condiciones para las cuales se
realiza la anterior la operación.
12.13 VERIFICACION SEGÚN C.21.6.5.1 NSR-10

La fuerza cortante de diseño (Ve) se puede obtener mediante la


siguiente expresión: Ve = Vp por lo cual se debe elegir el cortante de
diseño como el máximo entre el análisis estructural y el cortante
plástico.

El cortante plástico utilizamos el diagrama de interacción con


plastificación fs=1.25fy y sin factores de reducción fS=1.25fy.

De las combinaciones de carga con sismo escojo el Pu que me genera


la mayor resistencia a flexión.
 Vp: Cortante Plástico.
 MPr: Máximo momento probable resistido a flexión.
 lu: Luz libre de la columna

Luego Ve = Vp entonces Comparamos Ve con el Vu obtenido del


análisis estructural y trabajamos con el mayor.
Tenemos que φVn Donde Vn = Vc + Vs Vc : Esfuerzo resistido por el
concreto. Vs : Esfuerzo resistido por el acero transversal.
Se debe tener en cuenta que si:
 V u> 1/2Vp
 P u < 0.05 f’c *A g

El aporte del concreto al cortante es cero (0)
 V c=0

Ahora:

Comparamos el resultado anterior con el obtenido de las siguientes


ecuaciones:

Trabajamos con el área de acero mayor obtenido de las ecuaciones


anteriores, esto para estribos rectangulares. Para el refuerzo en
espiral tenemos:

Se trabaja con el mayor área de acero obtenido.

REQUERIMIENTOS C.21.6.4.1
 Suministrar estribos en la zona confinada medida a partir de la
cara del nudo en ambos extremos de la columna.
 La zona confinada será la mayor de las siguientes: La máxima
dimensión del elemento en la cara del nudo. 1/6 de la longitud
libre del elemento.
 450 mm El primer estribo de confinamiento debe colocarse al
menos a 50 mm de la cara del apoyo.
 El refuerzo transversal de confinamiento debe espaciarse a lo
largo del eje del elemento a una separación S que no exceda: ¼
de la dimensión mínima de la sección del elemento, o 6db de las
barras longitudinales
 So=100+(350-hx)/3 ; 100mm<=So<=150mm.
 En otras zonas la separación máxima del refuerzo transversal
debe ser: 6db de las barras longitudinales S<=15 cms
13 ELEMENTOS NO ESTRUCTURALES
Sa = Valor del espectro de aceleraciones de diseño para un periodo de vibración dado.
Vs = Cortante sísmico en la base
Aa = Coeficiente de aceleración pico efectiva
g= Gravedad
As= Aceleracion Maxima correspondiente a un T=0
M = Masa total de la edificación
hx= Altura en metros medida desde la base, del nivel del apoyo del elemento no estructural
heq= altura equivalente del sistema de un grado de libertad que simula la edificacion
ax = Aceleración horizontal que ocurre en el punto donde el elemento no estructural está soportado.
L= Longitud del elemento no estructural
E= Espesor del elemento no estructural
H= Altura del elemento no estructural
W = Densidad de la mampostería
Mp = Masa de elemento no estructural
ap = Coeficiente de amplificación dinámica del elemento no estructural
Rp = Coeficiente de capacidad de disipación de energía del elemento no estructural
Fp = fuerza sísmica horizontal sobre el elemento no estructural (A.9-2)
Mdis = momento de diseño

I = 1.00 Sa(g) = 1.00 Vs (kN) = 23.59 hx= 3.35 heq= 2.5125

GRADO DE DESEMPEÑO: SUPERIOR

FUERZAS SISMICAS DE DISEÑO:

Aa = 0.35 ax = As+(Sa-As)hx hx≤ heq


heq

g(m/s2)9.81
= ax= Sa hx hx ≥ heq
heq

mx(kg)2404.8
= ax = 1.33

Tomamos : ax = 0.40

DISEÑO

L(m) = 10 Rp = 1.50 Mp(kg) = 2404.8

ap = 2.50 H(m) = 2.75

E(m) =3494.976 Fp1= ax*ap*g*Mp Fp1= 5242.46


Rp
Fp1 ≤ Fp2 se escoge el mayor
Fp2= Aa*I*g*Mp Fp2= 412.84 de los dos valores
2

Mdis = Fp*H Mdis = 14416.78 kg-m

Vdis = Fp Vdis = 2621.23 kg


2
14 DATOS DE ENTRADA

GENERAL INPUT DATA

Structure type: Three-Dimensional Frame Structure


Number of Floor Grids . . . . = 1
Building total length . . . . = 25.72 m
Building total width . . . . . = 7.08 m

STORY INFORMATION

Number of Stories . . . . = 1
Total Frame Height . . . . = 3.7 m

Floor Story Height Grid No


------- ------------ -------
1 3.70 1
2 - 1
------- -------------- -------

* Story Height in (m)

STRUCTURAL GRID INFORMATION

GRID No 1

Grid Point X Y
------------- ---------- ----------
A-1 0.00 0.00
B-1 0.00 7.08
A-2 3.46 0.00
B-2 3.46 7.08
A-3 9.75 0.00
B-3 9.75 7.08
A-4 12.80 0.00
B-4 12.80 7.08
A-5 15.98 0.00
B-5 15.98 7.08
A-6 22.26 0.00
B-6 22.26 7.08
A-7 25.72 0.00
B-7 25.72 7.08
------------- ---------- ----------

* Coordinates X & Y are in (m)

MATERIALS
Number of materials = 1

REINFORCED CONCRETE

Mat Name f'c fy fys1 fys2 E G w


Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/m3
___ ______________ _________ _________ _________ _________ _________ _________ _________
1 3000PSI 210 4200 4200 4200 218540 87430 2400.0

MEMBER DATA

Total number of members..... = 26


Number of columns........... = 12
Number of beams ............ = 28
Number of braces ........... = 0

COLUMN SECTIONS

Number of prismatic sections = 1

Sec Name Shape b h tw tf P1 P2 A I2 I3 J


(cm) (cm) (cm) (cm) (cm) (cm) (cm2) (cm4) (cm4) (cm4)
___ ____________ _______ ______ ______ ______ ______ ______ ______ ________ __________ __________
_________

1 C30X45 Rectang 30.00 45.00 - - - - 1350.0 227812 101250 234900

COLUMNS

Column Story L Lu a c Theta Sec Mat System


(m) (m) (m) (m) (o) - - -
________ ____ ______ ______ _____ _____ ______ _____ _____ _____

B-7 1 3.70 3.10 0.23 0.38 0.0 1 1 G&L

A-7 1 3.70 3.10 0.23 0.38 0.0 1 1 G&L

B-6 1 3.70 3.10 0.23 0.38 0.0 1 1 G&L

A-6 1 3.70 3.10 0.23 0.38 0.0 1 1 G&L

B-5 1 3.70 3.10 0.23 0.38 0.0 1 1 G&L

A-5 1 3.70 3.10 0.23 0.38 0.0 1 1 G&L

B-3 1 3.70 3.10 0.23 0.38 0.0 1 1 G&L


A-3 1 3.70 3.10 0.23 0.38 0.0 1 1 G&L

B-2 1 3.70 3.10 0.23 0.38 0.0 1 1 G&L

A-2 1 3.70 3.10 0.23 0.38 0.0 1 1 G&L

B-1 1 3.70 3.10 0.23 0.38 0.0 1 1 G&L

A-1 1 3.70 3.10 0.23 0.38 0.0 1 1 G&L

BEAM SECTIONS

Number of prismatic sections = 1

Sec Name Shape b h tw tf P1 P2 A I2 I3 J


(cm) (cm) (cm) (cm) (cm) (cm) (cm2) (cm4) (cm4) (cm4)
___ ____________ _______ ______ ______ ______ ______ ______ ______ ________ __________ __________
_________

1 V30X45 Rectang 30.00 45.00 - - - - 1350.0 227812 101250 234900

BEAMS

Beam Floor L Lu a c Sec Mat System


(m) (m) (m) (m) - - -
_________ ______ ______ ______ _____ _____ _____ _____ _____

A(1-2) 1 3.46 3.16 0.15 0.15 1 1 G&L


A(2-3) 1 6.29 5.99 0.15 0.15 1 1 G&L
A(3-4) 1 3.05 2.90 0.15 0.00 1 1 G&L
A(4-5) 1 3.18 3.03 0.00 0.15 1 1 G&L
A(5-6) 1 6.28 5.98 0.15 0.15 1 1 G&L
A(6-7) 1 3.46 3.16 0.15 0.15 1 1 G&L
B(1-2) 1 3.46 3.16 0.15 0.15 1 1 G&L
B(2-3) 1 6.29 5.99 0.15 0.15 1 1 G&L
B(3-4) 1 3.05 2.90 0.15 0.00 1 1 G&L
B(4-5) 1 3.18 3.03 0.00 0.15 1 1 G&L
B(5-6) 1 6.28 5.98 0.15 0.15 1 1 G&L
B(6-7) 1 3.46 3.16 0.15 0.15 1 1 G&L

A(1-2) 2 3.46 3.16 0.15 0.15 1 1 G&L


A(2-3) 2 6.29 5.99 0.15 0.15 1 1 G&L
A(3-4) 2 3.05 2.90 0.15 0.00 1 1 G&L
A(4-5) 2 3.18 3.03 0.00 0.15 1 1 G&L
A(5-6) 2 6.28 5.98 0.15 0.15 1 1 G&L
A(6-7) 2 3.46 3.16 0.15 0.15 1 1 G&L
B(1-2) 2 3.46 3.16 0.15 0.15 1 1 G&L
B(2-3) 2 6.29 5.99 0.15 0.15 1 1 G&L
B(3-4) 2 3.05 2.90 0.15 0.00 1 1 G&L
B(4-5) 2 3.18 3.03 0.00 0.15 1 1 G&L
B(5-6) 2 6.28 5.98 0.15 0.15 1 1 G&L
B(6-7) 2 3.46 3.16 0.15 0.15 1 1 G&L
1(A-B) 1 7.08 6.63 0.23 0.23 1 1 G&L
7(A-B) 1 7.08 6.63 0.23 0.23 1 1 G&L

1(A-B) 2 7.08 6.63 0.23 0.23 1 1 G&L


7(A-B) 2 7.08 6.63 0.23 0.23 1 1 G&L

FOUNDATION SOIL PROPERTIES

Number of soil properties = 1

Soil Name Pressure Allowable Increase Pa MODULUS OF SUBGRADE REACTION


Distribution gross pres. Combinations Gravity load Lateral load
Pa incl.EQ & WL Analysis, Kg Analysis, Ks
T/m2 (%) T/m3 T/m3
____ ______________ ____________ __________ ___________ ____________ ____________
1 TIPO 1 Linear 17.0 0 400.0 400.0

* Values of subgrade reaction are used only on footings with rotations and/or vert-displac. permitted.

FOUNDATION BEAM DATA

Number of foundation beams = 14

FOUNDATION BEAMS

Beam Floor L Lu a c TWidth Sec Mat Soil System


(m) (m) (m) (m) (m) - - - -
_________ ______ ______ ______ _____ _____ _____ _____ _____ ______ ______

A(1-2) 1 3.46 3.16 0.15 0.15 1.0 1 1 1 G&L


A(2-3) 1 6.29 5.99 0.15 0.15 1.0 1 1 1 G&L
A(3-4) 1 3.05 2.90 0.15 0.00 1.0 1 1 1 G&L
A(4-5) 1 3.18 3.03 0.00 0.15 1.0 1 1 1 G&L
A(5-6) 1 6.28 5.98 0.15 0.15 1.0 1 1 1 G&L
A(6-7) 1 3.46 3.16 0.15 0.15 1.0 1 1 1 G&L
B(1-2) 1 3.46 3.16 0.15 0.15 1.0 1 1 1 G&L
B(2-3) 1 6.29 5.99 0.15 0.15 1.0 1 1 1 G&L
B(3-4) 1 3.05 2.90 0.15 0.00 1.0 1 1 1 G&L
B(4-5) 1 3.18 3.03 0.00 0.15 1.0 1 1 1 G&L
B(5-6) 1 6.28 5.98 0.15 0.15 1.0 1 1 1 G&L
B(6-7) 1 3.46 3.16 0.15 0.15 1.0 1 1 1 G&L
1(A-B) 1 7.08 6.63 0.23 0.23 1.0 1 1 1 G&L
7(A-B) 1 7.08 6.63 0.23 0.23 1.0 1 1 1 G&L

FOOTING DATA
Total number of footings ....... = 12

Footing Floor Type V-Disp Rotatn B L Area X-Cent Y-Cent Theta Mat Soil
m m m2 m m deg -- --
_______ ____ ______ ______ ______ _______ ______ _______ _______ _______ _______ _______
_______

B-7 1 Spread Fixed Fixed 1.43 1.58 2.24 25.72 7.08 0.0 1 1
A-7 1 Spread Fixed Fixed 1.45 1.60 2.32 25.72 0.00 0.0 1 1
B-6 1 Spread Fixed Fixed 1.35 1.50 2.02 22.26 7.08 0.0 1 1
A-6 1 Spread Fixed Fixed 1.35 1.50 2.02 22.26 0.00 0.0 1 1
B-5 1 Spread Fixed Fixed 1.33 1.48 1.95 15.98 7.08 0.0 1 1
A-5 1 Spread Fixed Fixed 1.33 1.48 1.95 15.98 0.00 0.0 1 1
B-3 1 Spread Fixed Fixed 1.33 1.48 1.95 9.75 7.08 0.0 1 1
A-3 1 Spread Fixed Fixed 1.33 1.48 1.95 9.75 0.00 0.0 1 1
B-2 1 Spread Fixed Fixed 1.35 1.50 2.03 3.46 7.08 0.0 1 1
A-2 1 Spread Fixed Fixed 1.35 1.50 2.03 3.46 0.00 0.0 1 1
B-1 1 Spread Fixed Fixed 1.43 1.58 2.24 0.00 7.08 0.0 1 1
A-1 1 Spread Fixed Fixed 1.45 1.60 2.32 0.00 0.00 0.0 1 1

SUMMARY OF TOTAL FLOOR LOADS

LOAD CASE 1 : SELFW (D0)

Force (ton) Moment (ton-m)


________________________ ________________________
Floor Px Py Pz Mx My Mz
______ ______ ______ ______ ______ ______ ______

2 0.00 0.00 35.64 0.0 0.0 0.0


1 0.00 0.00 21.25 0.0 0.0 0.0
______ ______ ______ ______ ______ ______ ______
Total 0.00 0.00 56.89 0.0 0.0 0.0

LOAD CASE 2 : DEAD (DL)

Force (ton) Moment (ton-m)


________________________ ________________________
Floor Px Py Pz Mx My Mz
______ ______ ______ ______ ______ ______ ______

2 0.00 0.00 27.31 0.0 0.0 0.0


1 0.00 0.00 0.00 0.0 0.0 0.0
______ ______ ______ ______ ______ ______ ______
Total 0.00 0.00 27.31 0.0 0.0 0.0
LOAD CASE 3 : LIVE (LL)

Force (ton) Moment (ton-m)


________________________ ________________________
Floor Px Py Pz Mx My Mz
______ ______ ______ ______ ______ ______ ______

2 0.00 0.00 9.10 0.0 0.0 0.0


1 0.00 0.00 0.00 0.0 0.0 0.0
______ ______ ______ ______ ______ ______ ______
Total 0.00 0.00 9.10 0.0 0.0 0.0

LOAD CASE 4 : EQUAKE X (EQX) - TYPE : EQUIVALENT STATIC

Force (ton) Acc. Tors. Mom. (ton-m)


________________________ ________________________
Floor Px Py Pz Mx My Mz
______ ______ ______ ______ ______ ______ ______

2 94.43 0.00 0.00 0.0 0.0 33.1


1 0.00 0.00 0.00 0.0 0.0 0.0
______ ______ ______ ______ ______ ______ ______
Total 94.43 0.00 0.00 0.0 0.0 33.1

LOAD CASE 5 : EQUAKE Y (EQY) - TYPE : EQUIVALENT STATIC

Force (ton) Acc. Tors. Mom. (ton-m)


________________________ ________________________
Floor Px Py Pz Mx My Mz
______ ______ ______ ______ ______ ______ ______

2 0.00 94.43 0.00 0.0 0.0 121.9


1 0.00 0.00 0.00 0.0 0.0 0.0
______ ______ ______ ______ ______ ______ ______
Total 0.00 94.43 0.00 0.0 0.0 121.9

LOAD CASE 6 : WIND X (WLX)

Force (ton) Moment (ton-m)


________________________ ________________________
Floor Px Py Pz Mx My Mz
______ ______ ______ ______ ______ ______ ______

2 1.66 0.00 0.00 0.0 0.0 0.6


1 1.66 0.00 0.00 0.0 0.0 0.0
______ ______ ______ ______ ______ ______ ______
Total 3.33 0.00 0.00 0.0 0.0 0.6

LOAD CASE 7 : WIND Y (WLY)

Force (ton) Moment (ton-m)


________________________ ________________________
Floor Px Py Pz Mx My Mz
______ ______ ______ ______ ______ ______ ______

2 0.00 7.47 0.00 0.0 0.0 10.1


1 0.00 7.47 0.00 0.0 0.0 0.0
______ ______ ______ ______ ______ ______ ______
Total 0.00 14.94 0.00 0.0 0.0 10.1

SUMMARY QUANTITY OF MATERIALS

COLUMNS
Item Section Material Length Weight/Len Total Weight
- - - m ton/m ton
____ ______________ __________ ________ __________ ____________
1 C30X45 3000PSI 37.20 0.324 12.05
____________
TOTAL = 12.05

BEAMS
Item Section Material Length Weight/Len Total Weight
- - - m ton/m ton
____ ______________ __________ ________ __________ ____________
1 V30X45 3000PSI 63.65 0.324 20.62
____________
TOTAL = 20.62

FOUNDATION BEAMS
Item Section Material Length Weight/Len Total Weight
- - - m ton/m ton
____ ______________ __________ ________ __________ ____________
1 V30X45 3000PSI 63.65 0.324 20.62
____________
TOTAL = 20.62

SLABS
Item Section Material Area Weight/Area Total Weight
- - - m² ton/m² ton
____ ______________ __________ ________ __________ ____________
1 CUBLIVIANA w =0 182.10 0.000
15 DATOS DE SALIDA

P-DELTA ANALYSIS - SUMMARY MAXIMUM MAXIMA DRIFT: (d/h)x =0.0021; (d/h)y =0.0030;
STORY DRIFT RATIO, D/h (d/h)r =0.0030

Drift-Ratio at CENTER OF MASS


MAXIMUM Corner Story-Drift-Ratio P-Delta Analysis- Column End Forces
------------------------------- ----------------------
---------------------
Story DriftX DriftY DriftR DriftX Units: ton, ton-m
DriftY DriftR Axis
______ _________ _________ _________ BOTTOM
_________ _________ _________ _________ TOP

1 0.0021 0.0027 0.0027 0.0021 _____________________________________________


0.0030 0.0030 A-1 __
______ _________ _________ _________ _____________________________________________
_________ _________ _________ _________ _
Maxima 0.0021 0.0027 0.0027 Column Stry Load Axial Shear2 Shear3
0.0021 0.0030 0.0030 Torque Mom-2 Mom-3 Axial Shear2 Shear3
______ _________ _________ _________ Torque Mom-2 Mom-3
_________ _________ _________ _________ ________ ____ ____ _____ ______ ______
_____ _______ _______ _____ ______ ______
DriftX = (Dx/h)max _____ _______ _______
DriftY = (Dy/h)max
DriftR = ([(Dx/h)² + (Dy/h)²]½)max
B-7 1 D0 2.7 0.0 0.5 0.0 0.6
0.0 2.7 0.0 0.5 0.0 -1.0 0.0
DL 0.6 0.0 0.0 0.0 0.0 0.1
P-DELTA ANALYSIS - DETAILED MAXIMUM 0.6 0.0 0.0 0.0 0.0 -0.1
STORY DRIFT RATIO, d/h LL 0.2 0.0 0.0 0.0 0.0 0.0
0.2 0.0 0.0 0.0 0.0 0.0
EQX -1.1 -1.2 0.1 0.0 0.1 -
Story ColAxis (dx/h)max (dy/h)max ([(dx/h)² 2.0 -1.1 -1.2 0.1 0.0 -0.1 1.7
+ (dy/h)²]½)max EQY -1.2 0.1 -3.2 0.0 -6.4
______ ________ ________ ________ 0.1 -1.2 0.1 -3.2 0.0 3.5 -0.1
____________________ WLX -0.1 -0.1 0.0 0.0 0.0 -
0.2 -0.1 -0.1 0.0 0.0 0.0 0.2
1 A-1 0.0021 0.0030 0.0030 WLY -0.5 0.0 -1.2 0.0 -2.4
B-1 0.0021 0.0030 0.0030 0.0 -0.5 0.0 -1.2 0.0 1.3 0.0
A-2 0.0021 0.0029 0.0029
B-2 0.0021 0.0029 0.0029
A-3 0.0021 0.0027 0.0027 A-7 1 D0 2.7 0.0 -0.5 0.0 -0.6
B-3 0.0021 0.0027 0.0027 0.0 2.7 0.0 -0.5 0.0 1.0 0.0
A-5 0.0021 0.0027 0.0027 DL 0.6 0.0 0.0 0.0 0.0 0.1
B-5 0.0021 0.0027 0.0027 0.6 0.0 0.0 0.0 0.0 -0.1
A-6 0.0021 0.0029 0.0029 LL 0.2 0.0 0.0 0.0 0.0 0.0
B-6 0.0021 0.0029 0.0029 0.2 0.0 0.0 0.0 0.0 0.0
A-7 0.0021 0.0030 0.0030 EQX -1.1 -1.2 0.1 0.0 0.1 -
B-7 0.0021 0.0030 0.0030 2.0 -1.1 -1.2 0.1 0.0 -0.1 1.7
EQY 1.2 -0.1 -3.2 0.0 -6.4 -
0.1 1.2 -0.1 -3.2 0.0 3.5 0.1
WLX -0.1 -0.1 0.0 0.0 0.0 -
Note: Drift amplification factor, D: .6666667 in 0.2 -0.1 -0.1 0.0 0.0 0.0 0.2
X; .6666667 in Y WLY 0.5 0.0 -1.2 0.0 -2.4
0.0 0.5 0.0 -1.2 0.0 1.3 0.0
EQY 0.0 0.1 -1.1 0.0 -3.9 0.1
0.0 0.1 -1.1 0.0 -0.4 -0.1
B-6 1 D0 2.9 0.1 0.0 0.0 0.0 WLX 0.0 -0.1 0.0 0.0 0.0 -
0.1 2.9 0.1 0.0 0.0 0.0 -0.2 0.2 0.0 -0.1 0.0 0.0 0.0 0.2
DL 2.8 0.1 0.0 0.0 0.0 0.2 WLY 0.0 0.0 -0.4 0.0 -1.5
2.8 0.1 0.0 0.0 0.0 -0.3 0.0 0.0 0.0 -0.4 0.0 -0.2 0.0
LL 0.9 0.0 0.0 0.0 0.0 0.1
0.9 0.0 0.0 0.0 0.0 -0.1
EQX 0.8 -1.4 0.0 0.0 0.1 -2.2 B-3 1 D0 3.3 0.0 0.0 0.0 0.0
0.8 -1.4 0.0 0.0 0.0 2.1 0.0 3.3 0.0 0.0 0.0 0.0 0.0
EQY -0.1 0.1 -1.2 0.0 -4.1 DL 3.4 0.0 0.0 0.0 0.0 0.0
0.1 -0.1 0.1 -1.2 0.0 -0.4 -0.1 3.4 0.0 0.0 0.0 0.0 -0.1
WLX 0.1 -0.2 0.0 0.0 0.0 - LL 1.1 0.0 0.0 0.0 0.0 0.0
0.2 0.1 -0.2 0.0 0.0 0.0 0.2 1.1 0.0 0.0 0.0 0.0 0.0
WLY 0.0 0.0 -0.5 0.0 -1.6 EQX 0.1 -1.2 0.0 0.0 0.0 -2.1
0.1 0.0 0.0 -0.5 0.0 -0.2 0.0 0.1 -1.2 0.0 0.0 0.0 1.8
EQY 0.0 0.1 -1.1 0.0 -3.9 0.1
0.0 0.1 -1.1 0.0 -0.4 -0.1
A-6 1 D0 2.9 0.1 0.0 0.0 0.0 WLX 0.0 -0.1 0.0 0.0 0.0 -
0.1 2.9 0.1 0.0 0.0 0.0 -0.2 0.2 0.0 -0.1 0.0 0.0 0.0 0.2
DL 2.8 0.1 0.0 0.0 0.0 0.2 WLY 0.0 0.0 -0.4 0.0 -1.5
2.8 0.1 0.0 0.0 0.0 -0.3 0.0 0.0 0.0 -0.4 0.0 -0.2 0.0
LL 0.9 0.0 0.0 0.0 0.0 0.1
0.9 0.0 0.0 0.0 0.0 -0.1
EQX 0.8 -1.4 0.0 0.0 0.1 -2.2 A-3 1 D0 3.3 0.0 0.0 0.0 0.0
0.8 -1.4 0.0 0.0 0.0 2.1 0.0 3.3 0.0 0.0 0.0 0.0 0.0
EQY 0.1 -0.1 -1.2 0.0 -4.1 - DL 3.4 0.0 0.0 0.0 0.0 0.0
0.1 0.1 -0.1 -1.2 0.0 -0.4 0.1 3.4 0.0 0.0 0.0 0.0 -0.1
WLX 0.1 -0.2 0.0 0.0 0.0 - LL 1.1 0.0 0.0 0.0 0.0 0.0
0.2 0.1 -0.2 0.0 0.0 0.0 0.2 1.1 0.0 0.0 0.0 0.0 0.0
WLY 0.0 0.0 -0.5 0.0 -1.6 - EQX 0.1 -1.2 0.0 0.0 0.0 -2.1
0.1 0.0 0.0 -0.5 0.0 -0.2 0.0 0.1 -1.2 0.0 0.0 0.0 1.8
EQY 0.0 -0.1 -1.1 0.0 -3.9 -
0.1 0.0 -0.1 -1.1 0.0 -0.4 0.1
B-5 1 D0 3.3 0.0 0.0 0.0 0.0 WLX 0.0 -0.1 0.0 0.0 0.0 -
0.0 3.3 0.0 0.0 0.0 0.0 0.0 0.2 0.0 -0.1 0.0 0.0 0.0 0.2
DL 3.4 0.0 0.0 0.0 0.0 0.0 WLY 0.0 0.0 -0.4 0.0 -1.5
3.4 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 -0.4 0.0 -0.2 0.0
LL 1.1 0.0 0.0 0.0 0.0 0.0
1.1 0.0 0.0 0.0 0.0 0.0
EQX -0.1 -1.2 0.0 0.0 0.0 - B-2 1 D0 2.9 -0.1 0.0 0.0 0.0 -
2.1 -0.1 -1.2 0.0 0.0 0.0 1.8 0.1 2.9 -0.1 0.0 0.0 0.0 0.2
EQY 0.0 -0.1 -1.1 0.0 -3.9 - DL 2.9 -0.1 0.0 0.0 0.0 -0.2
0.1 0.0 -0.1 -1.1 0.0 -0.4 0.1 2.9 -0.1 0.0 0.0 0.0 0.3
WLX 0.0 -0.1 0.0 0.0 0.0 - LL 1.0 0.0 0.0 0.0 0.0 -0.1
0.2 0.0 -0.1 0.0 0.0 0.0 0.2 1.0 0.0 0.0 0.0 0.0 0.1
WLY 0.0 0.0 -0.4 0.0 -1.5 EQX -0.8 -1.4 0.0 0.0 -0.1 -
0.0 0.0 0.0 -0.4 0.0 -0.2 0.0 2.2 -0.8 -1.4 0.0 0.0 0.0 2.1
EQY -0.1 -0.1 -1.2 0.0 -4.1 -
0.1 -0.1 -0.1 -1.2 0.0 -0.4 0.1
A-5 1 D0 3.3 0.0 0.0 0.0 0.0 WLX -0.1 -0.2 0.0 0.0 0.0 -
0.0 3.3 0.0 0.0 0.0 0.0 0.0 0.2 -0.1 -0.2 0.0 0.0 0.0 0.2
DL 3.4 0.0 0.0 0.0 0.0 0.0 WLY 0.0 0.0 -0.5 0.0 -1.6 -
3.4 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 -0.5 0.0 -0.2 0.0
LL 1.1 0.0 0.0 0.0 0.0 0.0
1.1 0.0 0.0 0.0 0.0 0.0
EQX -0.1 -1.2 0.0 0.0 0.0 - A-2 1 D0 2.9 -0.1 0.0 0.0 0.0 -
2.1 -0.1 -1.2 0.0 0.0 0.0 1.8 0.1 2.9 -0.1 0.0 0.0 0.0 0.2
DL 2.9 -0.1 0.0 0.0 0.0 -0.2 Beam Floor Load Axl Shr2 Shr3 Torque
2.9 -0.1 0.0 0.0 0.0 0.3 M2 M3 M2 X/L Axl Shr2 Shr3 Torque M2
LL 1.0 0.0 0.0 0.0 0.0 -0.1 M3
1.0 0.0 0.0 0.0 0.0 0.1 ________ ____ ____ ___ _____ _____
EQX -0.8 -1.4 0.0 0.0 -0.1 - ______ ______ _____ _____ ___ ___ _____ _____
2.2 -0.8 -1.4 0.0 0.0 0.0 2.1 ______ ______ _____
EQY 0.1 0.1 -1.2 0.0 -4.1 0.1
0.1 0.1 -1.2 0.0 -0.4 -0.1
WLX -0.1 -0.2 0.0 0.0 0.0 - A(1-2) 1 D0 0.0 0.0 -0.5 0.0 -0.3 0.0
0.2 -0.1 -0.2 0.0 0.0 0.0 0.2 0.1 .5 0.0 0.0 0.5 0.0 -0.3 0.0
WLY 0.0 0.0 -0.5 0.0 -1.6 DL 0.0 0.0 0.0 0.0 0.0 0.0
0.1 0.0 0.0 -0.5 0.0 -0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
B-1 1 D0 2.7 0.0 0.5 0.0 0.6 EQX 0.0 0.0 0.0 0.0 0.0 0.0
0.0 2.7 0.0 0.5 0.0 -1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
DL 0.6 0.0 0.0 0.0 0.0 -0.1 EQY 0.0 0.0 0.0 0.0 0.0 0.0
0.6 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL 0.2 0.0 0.0 0.0 0.0 0.0 WLX 0.0 0.0 0.0 0.0 0.0 0.0
0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
EQX 1.1 -1.2 -0.1 0.0 -0.1 - WLY 0.0 0.0 0.0 0.0 0.0 0.0
2.0 1.1 -1.2 -0.1 0.0 0.1 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
EQY -1.2 -0.1 -3.2 0.0 -6.4 -
0.1 -1.2 -0.1 -3.2 0.0 3.5 0.1
WLX 0.1 -0.1 0.0 0.0 0.0 - A(2-3) 1 D0 0.0 0.0 -1.0 0.0 -1.0 0.0
0.2 0.1 -0.1 0.0 0.0 0.0 0.2 0.5 .5 0.0 0.0 1.0 0.0 -1.0 0.0
WLY -0.5 0.0 -1.2 0.0 -2.4 DL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 -0.5 0.0 -1.2 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
A-1 1 D0 2.7 0.0 -0.5 0.0 -0.6 EQX 0.0 0.0 0.0 0.0 0.0 0.0
0.0 2.7 0.0 -0.5 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
DL 0.6 0.0 0.0 0.0 0.0 -0.1 EQY 0.0 0.0 0.0 0.0 0.0 0.0
0.6 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL 0.2 0.0 0.0 0.0 0.0 0.0 WLX 0.0 0.0 0.0 0.0 0.0 0.0
0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
EQX 1.1 -1.2 -0.1 0.0 -0.1 - WLY 0.0 0.0 0.0 0.0 0.0 0.0
2.0 1.1 -1.2 -0.1 0.0 0.1 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
EQY 1.2 0.1 -3.2 0.0 -6.4 0.1
1.2 0.1 -3.2 0.0 3.5 -0.1
WLX 0.1 -0.1 0.0 0.0 0.0 - A(3-4) 1 D0 0.0 0.0 -0.8 0.0 -0.8 0.0
0.2 0.1 -0.1 0.0 0.0 0.0 0.2 0.4 1.0 0.0 0.0 0.0 0.0 0.4 0.0
WLY 0.5 0.0 -1.2 0.0 -2.4 DL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.5 0.0 -1.2 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
EQX 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
P-Delta Analysis- Beam End Forces EQY 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WLX 0.0 0.0 0.0 0.0 0.0 0.0
Units: ton, ton-m 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WLY 0.0 0.0 0.0 0.0 0.0 0.0
END I X/L = 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
M2(+)max END J X/L = 1.0

________________________________________ A(4-5) 1 D0 0.0 0.0 0.0 0.0 0.4 0.0


__________ 0.4 0.0 0.0 0.0 0.8 0.0 -0.8 0.0
________________________________________
DL 0.0 0.0 0.0 0.0 0.0 0.0 WLY 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
EQX 0.0 0.0 0.0 0.0 0.0 0.0 B(2-3) 1 D0 0.0 0.0 -1.0 0.0 -1.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 .5 0.0 0.0 1.0 0.0 -1.0 0.0
EQY 0.0 0.0 0.0 0.0 0.0 0.0 DL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WLX 0.0 0.0 0.0 0.0 0.0 0.0 LL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WLY 0.0 0.0 0.0 0.0 0.0 0.0 EQX 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
EQY 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
A(5-6) 1 D0 0.0 0.0 -1.0 0.0 -1.0 0.0 WLX 0.0 0.0 0.0 0.0 0.0 0.0
0.5 .5 0.0 0.0 1.0 0.0 -1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
DL 0.0 0.0 0.0 0.0 0.0 0.0 WLY 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
EQX 0.0 0.0 0.0 0.0 0.0 0.0 B(3-4) 1 D0 0.0 0.0 -0.8 0.0 -0.8 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 1.0 0.0 0.0 0.0 0.0 0.4 0.0
EQY 0.0 0.0 0.0 0.0 0.0 0.0 DL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WLX 0.0 0.0 0.0 0.0 0.0 0.0 LL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WLY 0.0 0.0 0.0 0.0 0.0 0.0 EQX 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
EQY 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
A(6-7) 1 D0 0.0 0.0 -0.5 0.0 -0.3 0.0 WLX 0.0 0.0 0.0 0.0 0.0 0.0
0.1 .5 0.0 0.0 0.5 0.0 -0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
DL 0.0 0.0 0.0 0.0 0.0 0.0 WLY 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
EQX 0.0 0.0 0.0 0.0 0.0 0.0 B(4-5) 1 D0 0.0 0.0 0.0 0.0 0.4 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.0 0.8 0.0 -0.8 0.0
EQY 0.0 0.0 0.0 0.0 0.0 0.0 DL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WLX 0.0 0.0 0.0 0.0 0.0 0.0 LL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WLY 0.0 0.0 0.0 0.0 0.0 0.0 EQX 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
EQY 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
B(1-2) 1 D0 0.0 0.0 -0.5 0.0 -0.3 0.0 WLX 0.0 0.0 0.0 0.0 0.0 0.0
0.1 .5 0.0 0.0 0.5 0.0 -0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
DL 0.0 0.0 0.0 0.0 0.0 0.0 WLY 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
EQX 0.0 0.0 0.0 0.0 0.0 0.0 B(5-6) 1 D0 0.0 0.0 -1.0 0.0 -1.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 .5 0.0 0.0 1.0 0.0 -1.0 0.0
EQY 0.0 0.0 0.0 0.0 0.0 0.0 DL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WLX 0.0 0.0 0.0 0.0 0.0 0.0 LL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
EQX 0.0 0.0 0.0 0.0 0.0 0.0 A(3-4) 2 D0 0.0 0.0 -1.0 0.0 -1.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 1.0 0.0 0.0 0.0 0.0 0.5 0.0
EQY 0.0 0.0 0.0 0.0 0.0 0.0 DL 0.0 0.0 -1.6 0.0 -1.6 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.0 0.0 0.0 0.0 0.0 0.7 0.0
WLX 0.0 0.0 0.0 0.0 0.0 0.0 LL 0.0 0.0 -0.5 0.0 -0.5 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 1.0 0.0 0.0 0.0 0.0 0.2 0.0
WLY 0.0 0.0 0.0 0.0 0.0 0.0 EQX 0.0 0.0 -0.4 0.0 -1.1 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -0.4 0.0 0.0 0.0
EQY 0.0 0.0 0.0 0.0 0.1 0.0
0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
B(6-7) 1 D0 0.0 0.0 -0.5 0.0 -0.3 0.0 WLX 0.0 0.0 0.0 0.0 -0.1 0.0
0.1 .5 0.0 0.0 0.5 0.0 -0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
DL 0.0 0.0 0.0 0.0 0.0 0.0 WLY 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
EQX 0.0 0.0 0.0 0.0 0.0 0.0 A(4-5) 2 D0 0.0 0.0 0.0 0.0 0.5 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.0 1.0 0.0 -1.0 0.0
EQY 0.0 0.0 0.0 0.0 0.0 0.0 DL 0.0 0.0 0.0 0.0 0.7 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.0 0.0 1.6 0.0 -1.6 0.0
WLX 0.0 0.0 0.0 0.0 0.0 0.0 LL 0.0 0.0 0.0 0.0 0.2 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.5 0.0 -0.5 0.0
WLY 0.0 0.0 0.0 0.0 0.0 0.0 EQX 0.0 0.0 -0.4 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.1 1.0 0.0 0.0 -0.4 0.0 1.1 0.0
EQY 0.0 0.0 0.0 0.0 0.0 0.0
0.1 1.0 0.0 0.0 0.0 0.0 0.1 0.0
A(1-2) 2 D0 0.0 0.0 -0.3 0.0 0.0 0.0 WLX 0.0 0.0 0.0 0.0 0.0 0.0
0.1 .3 0.0 0.0 0.7 0.0 -0.6 0.0 0.1 1.0 0.0 0.0 0.0 0.0 0.1 0.0
DL 0.0 0.0 -0.5 0.0 0.0 0.0 WLY 0.0 0.0 0.0 0.0 0.0 0.0
0.2 .3 0.0 0.0 1.2 0.0 -1.0 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0
LL 0.0 0.0 -0.2 0.0 0.0 0.0
0.1 .3 0.0 0.0 0.4 0.0 -0.3 0.0
EQX 0.0 0.0 -1.1 0.0 -1.9 0.0 A(5-6) 2 D0 0.0 0.0 -1.0 0.0 -1.0 0.0
1.6 1.0 0.0 0.0 -1.1 0.0 1.6 0.0 0.5 .5 0.0 0.0 0.9 0.0 -0.8 0.0
EQY 0.0 0.0 0.1 0.0 0.1 0.0 DL 0.0 0.0 -1.6 0.0 -1.7 0.0
0.1 0.0 0.0 0.0 0.1 0.0 -0.1 0.0 0.9 .5 0.0 0.0 1.5 0.0 -1.3 0.0
WLX 0.0 0.0 -0.1 0.0 -0.2 0.0 LL 0.0 0.0 -0.5 0.0 -0.6 0.0
0.2 1.0 0.0 0.0 -0.1 0.0 0.2 0.0 0.3 .5 0.0 0.0 0.5 0.0 -0.4 0.0
WLY 0.0 0.0 0.0 0.0 0.0 0.0 EQX 0.0 0.0 -0.3 0.0 -1.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 1.0 0.0 0.0 -0.3 0.0 0.8 0.0
EQY 0.0 0.0 0.0 0.0 0.1 0.0
0.1 0.0 0.0 0.0 0.0 0.0 -0.1 0.0
A(2-3) 2 D0 0.0 0.0 -0.9 0.0 -0.8 0.0 WLX 0.0 0.0 0.0 0.0 -0.1 0.0
0.5 .5 0.0 0.0 1.0 0.0 -1.0 0.0 0.1 1.0 0.0 0.0 0.0 0.0 0.1 0.0
DL 0.0 0.0 -1.5 0.0 -1.3 0.0 WLY 0.0 0.0 0.0 0.0 0.0 0.0
0.9 .5 0.0 0.0 1.6 0.0 -1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL 0.0 0.0 -0.5 0.0 -0.4 0.0
0.3 .5 0.0 0.0 0.5 0.0 -0.6 0.0
EQX 0.0 0.0 -0.3 0.0 -0.8 0.0 A(6-7) 2 D0 0.0 0.0 -0.7 0.0 -0.6 0.0
1.0 1.0 0.0 0.0 -0.3 0.0 1.0 0.0 0.1 .7 0.0 0.0 0.3 0.0 0.0 0.0
EQY 0.0 0.0 0.0 0.0 -0.1 0.0 DL 0.0 0.0 -1.2 0.0 -1.0 0.0
0.1 1.0 0.0 0.0 0.0 0.0 0.1 0.0 0.2 .7 0.0 0.0 0.5 0.0 0.0 0.0
WLX 0.0 0.0 0.0 0.0 -0.1 0.0 LL 0.0 0.0 -0.4 0.0 -0.3 0.0
0.1 1.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 .7 0.0 0.0 0.2 0.0 0.0 0.0
WLY 0.0 0.0 0.0 0.0 0.0 0.0 EQX 0.0 0.0 -1.1 0.0 -1.6 0.0
0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 1.9 1.0 0.0 0.0 -1.1 0.0 1.9 0.0
EQY 0.0 0.0 -0.1 0.0 -0.1 0.0
0.1 1.0 0.0 0.0 -0.1 0.0 0.1 0.0
WLX 0.0 0.0 -0.1 0.0 -0.2 0.0 LL 0.0 0.0 0.0 0.0 0.2 0.0
0.2 1.0 0.0 0.0 -0.1 0.0 0.2 0.0 0.2 0.0 0.0 0.0 0.5 0.0 -0.5 0.0
WLY 0.0 0.0 0.0 0.0 0.0 0.0 EQX 0.0 0.0 -0.4 0.0 0.0 0.0
0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 1.1 1.0 0.0 0.0 -0.4 0.0 1.1 0.0
EQY 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 -0.1 0.0
B(1-2) 2 D0 0.0 0.0 -0.3 0.0 0.0 0.0 WLX 0.0 0.0 0.0 0.0 0.0 0.0
0.1 .3 0.0 0.0 0.7 0.0 -0.6 0.0 0.1 1.0 0.0 0.0 0.0 0.0 0.1 0.0
DL 0.0 0.0 -0.5 0.0 0.0 0.0 WLY 0.0 0.0 0.0 0.0 0.0 0.0
0.2 .3 0.0 0.0 1.2 0.0 -1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL 0.0 0.0 -0.2 0.0 0.0 0.0
0.1 .3 0.0 0.0 0.4 0.0 -0.3 0.0
EQX 0.0 0.0 -1.1 0.0 -1.9 0.0 B(5-6) 2 D0 0.0 0.0 -1.0 0.0 -1.0 0.0
1.6 1.0 0.0 0.0 -1.1 0.0 1.6 0.0 0.5 .5 0.0 0.0 0.9 0.0 -0.8 0.0
EQY 0.0 0.0 -0.1 0.0 -0.1 0.0 DL 0.0 0.0 -1.6 0.0 -1.7 0.0
0.1 1.0 0.0 0.0 -0.1 0.0 0.1 0.0 0.9 .5 0.0 0.0 1.5 0.0 -1.3 0.0
WLX 0.0 0.0 -0.1 0.0 -0.2 0.0 LL 0.0 0.0 -0.5 0.0 -0.6 0.0
0.2 1.0 0.0 0.0 -0.1 0.0 0.2 0.0 0.3 .5 0.0 0.0 0.5 0.0 -0.4 0.0
WLY 0.0 0.0 0.0 0.0 0.0 0.0 EQX 0.0 0.0 -0.3 0.0 -1.0 0.0
0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 1.0 0.0 0.0 -0.3 0.0 0.8 0.0
EQY 0.0 0.0 0.0 0.0 -0.1 0.0
0.1 1.0 0.0 0.0 0.0 0.0 0.1 0.0
B(2-3) 2 D0 0.0 0.0 -0.9 0.0 -0.8 0.0 WLX 0.0 0.0 0.0 0.0 -0.1 0.0
0.5 .5 0.0 0.0 1.0 0.0 -1.0 0.0 0.1 1.0 0.0 0.0 0.0 0.0 0.1 0.0
DL 0.0 0.0 -1.5 0.0 -1.3 0.0 WLY 0.0 0.0 0.0 0.0 0.0 0.0
0.9 .5 0.0 0.0 1.6 0.0 -1.7 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0
LL 0.0 0.0 -0.5 0.0 -0.4 0.0
0.3 .5 0.0 0.0 0.5 0.0 -0.6 0.0
EQX 0.0 0.0 -0.3 0.0 -0.8 0.0 B(6-7) 2 D0 0.0 0.0 -0.7 0.0 -0.6 0.0
1.0 1.0 0.0 0.0 -0.3 0.0 1.0 0.0 0.1 .7 0.0 0.0 0.3 0.0 0.0 0.0
EQY 0.0 0.0 0.0 0.0 0.1 0.0 DL 0.0 0.0 -1.2 0.0 -1.0 0.0
0.1 0.0 0.0 0.0 0.0 0.0 -0.1 0.0 0.2 .7 0.0 0.0 0.5 0.0 0.0 0.0
WLX 0.0 0.0 0.0 0.0 -0.1 0.0 LL 0.0 0.0 -0.4 0.0 -0.3 0.0
0.1 1.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 .7 0.0 0.0 0.2 0.0 0.0 0.0
WLY 0.0 0.0 0.0 0.0 0.0 0.0 EQX 0.0 0.0 -1.1 0.0 -1.6 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.9 1.0 0.0 0.0 -1.1 0.0 1.9 0.0
EQY 0.0 0.0 0.1 0.0 0.1 0.0
0.1 0.0 0.0 0.0 0.1 0.0 -0.1 0.0
B(3-4) 2 D0 0.0 0.0 -1.0 0.0 -1.0 0.0 WLX 0.0 0.0 -0.1 0.0 -0.2 0.0
0.5 1.0 0.0 0.0 0.0 0.0 0.5 0.0 0.2 1.0 0.0 0.0 -0.1 0.0 0.2 0.0
DL 0.0 0.0 -1.6 0.0 -1.6 0.0 WLY 0.0 0.0 0.0 0.0 0.0 0.0
0.7 1.0 0.0 0.0 0.0 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL 0.0 0.0 -0.5 0.0 -0.5 0.0
0.2 1.0 0.0 0.0 0.0 0.0 0.2 0.0
EQX 0.0 0.0 -0.4 0.0 -1.1 0.0 1(A-B) 1 D0 0.0 0.0 -1.1 0.0 -1.2 0.0
0.0 0.0 0.0 0.0 -0.4 0.0 0.0 0.0 0.6 .5 0.0 0.0 1.1 0.0 -1.2 0.0
EQY 0.0 0.0 0.0 0.0 -0.1 0.0 DL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WLX 0.0 0.0 0.0 0.0 -0.1 0.0 LL 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WLY 0.0 0.0 0.0 0.0 0.0 0.0 EQX 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
EQY 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
B(4-5) 2 D0 0.0 0.0 0.0 0.0 0.5 0.0 WLX 0.0 0.0 0.0 0.0 0.0 0.0
0.5 0.0 0.0 0.0 1.0 0.0 -1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
DL 0.0 0.0 0.0 0.0 0.7 0.0 WLY 0.0 0.0 0.0 0.0 0.0 0.0
0.7 0.0 0.0 0.0 1.6 0.0 -1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
______________ ____ ______ ______
7(A-B) 1 D0 0.0 0.0 -1.1 0.0 -1.2 0.0 ______ ______ ______
0.6 .5 0.0 0.0 1.1 0.0 -1.2 0.0
DL 0.0 0.0 0.0 0.0 0.0 0.0 A(1-2) 1 D0 0.00 0.00 0.00
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00
LL 0.0 0.0 0.0 0.0 0.0 0.0 DL 0.00 0.00 0.00
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00
EQX 0.0 0.0 0.0 0.0 0.0 0.0 LL 0.00 0.00 0.00
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00
EQY 0.0 0.0 0.0 0.0 0.0 0.0 EQX 0.00 0.00 0.00
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00
WLX 0.0 0.0 0.0 0.0 0.0 0.0 EQY 0.00 0.00 0.00
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00
WLY 0.0 0.0 0.0 0.0 0.0 0.0 WLX 0.00 0.00 0.00
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00
WLY 0.00 0.00 0.00
0.00
1(A-B) 2 D0 0.0 0.0 -1.1 0.0 -1.0 0.0
0.8 .5 0.0 0.0 1.1 0.0 -1.0 0.0 A(2-3) 1 D0 0.00 0.00 0.00
DL 0.0 0.0 0.0 0.0 0.0 0.0 0.00
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 DL 0.00 0.00 0.00
LL 0.0 0.0 0.0 0.0 0.0 0.0 0.00
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LL 0.00 0.00 0.00
EQX 0.0 0.0 0.0 0.0 -0.1 0.0 0.00
0.1 1.0 0.0 0.0 0.0 0.0 0.1 0.0 EQX 0.00 0.00 0.00
EQY 0.0 0.0 -1.3 0.0 -4.4 0.0 0.00
4.4 1.0 0.0 0.0 -1.3 0.0 4.4 0.0 EQY 0.00 0.00 0.00
WLX 0.0 0.0 0.0 0.0 0.0 0.0 0.00
0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 WLX 0.00 0.00 0.00
WLY 0.0 0.0 -0.5 0.0 -1.6 0.0 0.00
1.6 1.0 0.0 0.0 -0.5 0.0 1.6 0.0 WLY 0.00 0.00 0.00
0.00

7(A-B) 2 D0 0.0 0.0 -1.1 0.0 -1.0 0.0 A(3-4) 1 D0 0.00 0.07 0.00
0.8 .5 0.0 0.0 1.1 0.0 -1.0 0.0 0.07
DL 0.0 0.0 0.0 0.0 0.0 0.0 DL 0.00 0.00 0.00
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00
LL 0.0 0.0 0.0 0.0 0.0 0.0 LL 0.00 0.00 0.00
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00
EQX 0.0 0.0 0.0 0.0 0.1 0.0 EQX 0.00 0.00 0.00
0.1 0.0 0.0 0.0 0.0 0.0 -0.1 0.0 0.00
EQY 0.0 0.0 -1.3 0.0 -4.4 0.0 EQY 0.00 0.00 0.00
4.4 1.0 0.0 0.0 -1.3 0.0 4.4 0.0 0.00
WLX 0.0 0.0 0.0 0.0 0.0 0.0 WLX 0.00 0.00 0.00
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00
WLY 0.0 0.0 -0.5 0.0 -1.6 0.0 WLY 0.00 0.00 0.00
1.6 1.0 0.0 0.0 -0.5 0.0 1.6 0.0 0.00

A(4-5) 1 D0 0.07 0.00 0.07


0.00
P-Delta Analysis DL 0.00 0.00 0.00
0.00
LL 0.00 0.00 0.00
Load Dist. Force w (ton/m) 0.00
Pressure P (ton/m2) EQX 0.00 0.00 0.00
____________________ ______ 0.00
__________________ _______________ EQY 0.00 0.00 0.00
Beam Floor LdCase wi wj Pi 0.00
Pj
WLX 0.00 0.00 0.00 EQY 0.00 0.00 0.00
0.00 0.00
WLY 0.00 0.00 0.00 WLX 0.00 0.00 0.00
0.00 0.00
WLY 0.00 0.00 0.00
A(5-6) 1 D0 0.00 0.00 0.00 0.00
0.00
DL 0.00 0.00 0.00 B(3-4) 1 D0 0.00 0.07 0.00
0.00 0.07
LL 0.00 0.00 0.00 DL 0.00 0.00 0.00
0.00 0.00
EQX 0.00 0.00 0.00 LL 0.00 0.00 0.00
0.00 0.00
EQY 0.00 0.00 0.00 EQX 0.00 0.00 0.00
0.00 0.00
WLX 0.00 0.00 0.00 EQY 0.00 0.00 0.00
0.00 0.00
WLY 0.00 0.00 0.00 WLX 0.00 0.00 0.00
0.00 0.00
WLY 0.00 0.00 0.00
A(6-7) 1 D0 0.00 0.00 0.00 0.00
0.00
DL 0.00 0.00 0.00 B(4-5) 1 D0 0.07 0.00 0.07
0.00 0.00
LL 0.00 0.00 0.00 DL 0.00 0.00 0.00
0.00 0.00
EQX 0.00 0.00 0.00 LL 0.00 0.00 0.00
0.00 0.00
EQY 0.00 0.00 0.00 EQX 0.00 0.00 0.00
0.00 0.00
WLX 0.00 0.00 0.00 EQY 0.00 0.00 0.00
0.00 0.00
WLY 0.00 0.00 0.00 WLX 0.00 0.00 0.00
0.00 0.00
WLY 0.00 0.00 0.00
B(1-2) 1 D0 0.00 0.00 0.00 0.00
0.00
DL 0.00 0.00 0.00 B(5-6) 1 D0 0.00 0.00 0.00
0.00 0.00
LL 0.00 0.00 0.00 DL 0.00 0.00 0.00
0.00 0.00
EQX 0.00 0.00 0.00 LL 0.00 0.00 0.00
0.00 0.00
EQY 0.00 0.00 0.00 EQX 0.00 0.00 0.00
0.00 0.00
WLX 0.00 0.00 0.00 EQY 0.00 0.00 0.00
0.00 0.00
WLY 0.00 0.00 0.00 WLX 0.00 0.00 0.00
0.00 0.00
WLY 0.00 0.00 0.00
B(2-3) 1 D0 0.00 0.00 0.00 0.00
0.00
DL 0.00 0.00 0.00 B(6-7) 1 D0 0.00 0.00 0.00
0.00 0.00
LL 0.00 0.00 0.00 DL 0.00 0.00 0.00
0.00 0.00
EQX 0.00 0.00 0.00 LL 0.00 0.00 0.00
0.00 0.00
EQX 0.00 0.00 0.00 DL -0.05 0.00 0.60 0.00
0.00 -0.07 0.00 0.39 0.14
EQY 0.00 0.00 0.00 LL -0.02 0.00 0.20 0.00
0.00 -0.02 0.00 0.13 0.05
WLX 0.00 0.00 0.00 EQX 1.18 -0.07 -1.11 0.16
0.00 2.28 0.00 4.06 -5.05
WLY 0.00 0.00 0.00 EQY -0.07 3.18 -1.25 -7.14
0.00 -0.14 0.00 11.83 -12.94
WLX 0.55 -0.29 -0.12 0.02
1(A-B) 1 D0 0.00 0.00 0.00 0.25 0.00 0.45 -0.56
0.00 WLY -0.58 1.45 -0.47 -2.68
DL 0.00 0.00 0.00 -0.05 0.00 4.45 -4.86
0.00
LL 0.00 0.00 0.00 A-7 1 D0 -0.03 0.51 4.41
0.00 0.75 0.32 0.00 3.68 0.12
EQX 0.00 0.00 0.00 DL -0.05 0.00 0.60 0.00
0.00 -0.07 0.00 0.38 0.14
EQY 0.00 0.00 0.00 LL -0.02 0.00 0.20 0.00
0.00 -0.02 0.00 0.13 0.05
WLX 0.00 0.00 0.00 EQX 1.18 -0.07 -1.11 0.16
0.00 2.28 0.00 3.85 -4.81
WLY 0.00 0.00 0.00 EQY 0.07 3.18 1.25 -7.14
0.00 0.14 0.00 12.33 -11.25
WLX 0.55 0.27 -0.12 0.02
7(A-B) 1 D0 0.00 0.00 0.00 0.25 0.00 0.43 -0.54
0.00 WLY -0.52 1.45 0.47 -2.68
DL 0.00 0.00 0.00 0.05 0.00 4.63 -4.23
0.00
LL 0.00 0.00 0.00 B-6 1 D0 -0.09 0.00 4.52
0.00 0.01 0.65 0.00 3.67 0.80
EQX 0.00 0.00 0.00 DL -0.15 0.00 2.85 0.00
0.00 -0.20 0.00 1.84 0.97
EQY 0.00 0.00 0.00 LL -0.05 0.00 0.95 0.00
0.00 -0.07 0.00 0.61 0.32
WLX 0.00 0.00 0.00 EQX 1.38 -0.02 0.81 0.08
0.00 2.55 0.00 6.15 -5.35
WLY 0.00 0.00 0.00 EQY -0.08 1.19 -0.06 -4.41
0.00 -0.15 0.00 9.02 -9.07
WLX 0.15 -0.79 0.09 0.01
0.28 0.00 0.68 -0.60
WLY -0.03 1.16 -0.02 -1.65
-0.06 0.00 3.39 -3.41

P-Delta Analysis- Footing Contact Pressures A-6 1 D0 -0.09 0.00 4.52 -


0.01 0.65 0.00 3.67 0.80
DL -0.15 0.00 2.85 0.00
Footing group Load Force (ton) -0.20 0.00 1.84 0.97
Moment (ton-m) Pressure (ton/m2) LL -0.05 0.00 0.95 0.00
_______________ ______ -0.07 0.00 0.61 0.32
__________________________ EQX 1.38 -0.02 0.81 0.08
__________________________ ________________ 2.55 0.00 6.15 -5.35
Group Floor LdCase Rx Ry Rz EQY 0.08 1.19 0.06 -4.41
Mx My Mz PcMax PcMin 0.15 0.00 9.07 -9.02
________ _____ ______ ______ ______ WLX 0.15 0.78 0.09 0.01
______ ______ ______ ______ ______ 0.28 0.00 0.68 -0.60
______ WLY 0.03 1.16 0.02 -1.65
0.06 0.00 3.41 -3.39
B-7 1 D0 -0.03 -0.51 4.41 -
0.75 0.32 0.00 3.84 0.10
B-5 1 D0 0.02 0.00 5.18 0.00
-0.15 0.00 2.99 2.31 B-2 1 D0 0.09 0.00 4.53 0.01
DL 0.03 0.00 3.38 0.00 -0.65 0.00 3.67 0.80
0.05 0.00 1.84 1.62 DL 0.15 0.00 2.85 0.00
LL 0.01 0.00 1.13 0.00 0.20 0.00 1.84 0.97
0.02 0.00 0.61 0.54 LL 0.05 0.00 0.95 0.00
EQX 1.23 -0.01 -0.09 0.03 0.07 0.00 0.61 0.32
2.34 0.00 5.43 -5.51 EQX 1.38 0.02 -0.81 -0.08
EQY 0.07 1.11 0.01 -4.14 2.55 0.00 5.35 -6.15
0.14 0.00 8.94 -8.94 EQY 0.08 1.19 -0.06 -4.41
WLX 0.14 -0.77 -0.01 0.00 0.15 0.00 9.02 -9.08
0.26 0.00 0.60 -0.61 WLX 0.15 -0.79 -0.09 -0.01
WLY 0.03 1.10 0.00 -1.55 0.28 0.00 0.60 -0.68
0.05 0.00 3.35 -3.35 WLY 0.03 1.16 -0.02 -1.65
0.06 0.00 3.39 -3.41
A-5 1 D0 0.02 0.00 5.18 0.00
-0.15 0.00 2.99 2.31 A-2 1 D0 0.09 0.00 4.53 -
DL 0.03 0.00 3.38 0.00 0.01 -0.65 0.00 3.67 0.80
0.05 0.00 1.84 1.62 DL 0.15 0.00 2.85 0.00
LL 0.01 0.00 1.13 0.00 0.20 0.00 1.84 0.97
0.02 0.00 0.61 0.54 LL 0.05 0.00 0.95 0.00
EQX 1.23 -0.01 -0.09 0.03 0.07 0.00 0.61 0.32
2.34 0.00 5.43 -5.51 EQX 1.38 0.02 -0.81 -0.08
EQY -0.07 1.11 -0.01 -4.14 2.55 0.00 5.35 -6.15
-0.14 0.00 8.94 -8.94 EQY -0.08 1.19 0.06 -4.41
WLX 0.14 0.76 -0.01 0.00 -0.15 0.00 9.08 -9.02
0.26 0.00 0.60 -0.61 WLX 0.15 0.79 -0.09 -0.01
WLY -0.03 1.10 0.00 -1.55 0.28 0.00 0.60 -0.68
-0.05 0.00 3.35 -3.35 WLY -0.03 1.16 0.02 -1.65
-0.06 0.00 3.41 -3.39
B-3 1 D0 -0.02 0.00 5.18
0.00 0.15 0.00 3.00 2.30 B-1 1 D0 0.03 -0.51 4.41 -
DL -0.04 0.00 3.38 0.00 0.75 -0.32 0.00 3.84 0.10
-0.05 0.00 1.84 1.62 DL 0.05 0.00 0.60 0.00
LL -0.01 0.00 1.13 0.00 0.07 0.00 0.39 0.14
-0.02 0.00 0.61 0.54 LL 0.02 0.00 0.20 0.00
EQX 1.23 0.01 0.09 -0.02 0.02 0.00 0.13 0.05
2.34 0.00 5.51 -5.43 EQX 1.18 0.07 1.11 -0.16
EQY -0.07 1.11 0.01 -4.14 2.28 0.00 5.05 -4.06
-0.14 0.00 8.94 -8.94 EQY 0.07 3.18 -1.25 -7.14
WLX 0.14 -0.75 0.01 0.00 0.14 0.00 11.83 -12.94
0.26 0.00 0.61 -0.60 WLX 0.55 -0.27 0.12 -0.02
WLY -0.03 1.09 0.00 -1.55 0.25 0.00 0.56 -0.45
-0.05 0.00 3.35 -3.35 WLY 0.58 1.45 -0.47 -2.68
0.05 0.00 4.45 -4.87
A-3 1 D0 -0.02 0.00 5.18
0.00 0.15 0.00 3.00 2.30 A-1 1 D0 0.03 0.51 4.41 0.75
DL -0.04 0.00 3.38 0.00 -0.32 0.00 3.68 0.12
-0.05 0.00 1.84 1.62 DL 0.05 0.00 0.60 0.00
LL -0.01 0.00 1.13 0.00 0.07 0.00 0.37 0.14
-0.02 0.00 0.61 0.54 LL 0.02 0.00 0.20 0.00
EQX 1.23 0.01 0.09 -0.02 0.02 0.00 0.12 0.05
2.34 0.00 5.51 -5.43 EQX 1.18 0.07 1.11 -0.16
EQY 0.07 1.11 -0.01 -4.14 2.28 0.00 4.81 -3.85
0.14 0.00 8.94 -8.94 EQY -0.07 3.18 1.25 -7.14
WLX 0.14 0.76 0.01 0.00 -0.14 0.00 12.33 -11.26
0.26 0.00 0.61 -0.60 WLX 0.55 0.29 0.12 -0.02
WLY 0.03 1.09 0.00 -1.55 0.25 0.00 0.54 -0.43
0.05 0.00 3.35 -3.35
WLY 0.52 1.45 0.47 -2.68 5 1.2D0 + 1.2DL + .5LL + WLY
-0.05 0.00 4.64 -4.23 6 1.2D0 + 1.2DL + .5LL - WLY
7 1.2D0 + 1.2DL + .5LL + .75WLX + .75WLY
8 1.2D0 + 1.2DL + .5LL - .75WLX - .75WLY
9 1.2D0 + 1.2DL + .5WLX
10 1.2D0 + 1.2DL - .5WLX
11 1.2D0 + 1.2DL + .5WLY
P-Delta Analysis- Footing Envelopes 12 1.2D0 + 1.2DL - .5WLY
13 1.2D0 + 1.2DL + .375WLX + .375WLY
14 1.2D0 + 1.2DL - .375WLX - .375WLY
Load combinations : Ultimate / Existing 15 .9D0 + .9DL + WLX
Type of contact pressure: Linear, PmaxPmin = 16 .9D0 + .9DL - WLX
Rz/A (1 ± eb/S3 ± el/S2) 17 .9D0 + .9DL + WLY
Self weight of footing: 0.10 Rz (D0 + DL + LL) 18 .9D0 + .9DL - WLY
19 1.2D0 + 1.2DL + .5LL + EQX + .3EQY
20 1.2D0 + 1.2DL + .5LL - EQX - .3EQY
Group Floor Rz max Rz min Pc max 21 1.2D0 + 1.2DL + .5LL + EQX - .3EQY
Pc min Pc/Pa max Pc/Pa min 22 1.2D0 + 1.2DL + .5LL - EQX + .3EQY
ton ton ton/m2 ton/m2 23 1.2D0 + 1.2DL + .5LL + .3EQX + EQY
________ _____ _______ _______ 24 1.2D0 + 1.2DL + .5LL - .3EQX - EQY
_______ _______ _______ ________ 25 1.2D0 + 1.2DL + .5LL - .3EQX + EQY
26 1.2D0 + 1.2DL + .5LL + .3EQX - EQY
B-7 1 8.22 3.45 17.39 -13.09 27 .9D0 + .9DL + EQX + .3EQY
1.02 -0.77 28 .9D0 + .9DL - EQX - .3EQY
A-7 1 8.22 3.45 16.75 -12.60 29 .9D0 + .9DL + EQX - .3EQY
0.99 -0.74 30 .9D0 + .9DL - EQX + .3EQY
B-6 1 11.20 6.64 17.06 -7.84 31 .9D0 + .9DL + .3EQX + EQY
1.00 -0.46 32 .9D0 + .9DL - .3EQX - EQY
A-6 1 11.20 6.64 16.97 -7.75 33 .9D0 + .9DL - .3EQX + EQY
1.00 -0.46 34 .9D0 + .9DL + .3EQX - EQY
B-5 1 13.03 8.58 16.86 -6.32
0.99 -0.37
A-5 1 13.03 8.58 16.89 -6.35
0.99 -0.37
B-3 1 13.04 8.58 16.87 -6.32
0.99 -0.37 MATERIALS
A-3 1 13.04 8.58 16.90 -6.35
0.99 -0.37 Number of materials = 1
B-2 1 11.21 6.65 17.07 -7.84
1.00 -0.46
A-2 1 11.21 6.65 16.98 -7.75 REINFORCED CONCRETE
1.00 -0.46
B-1 1 8.22 3.45 17.39 -13.09 Mat Name f'c fy fys1 fys2
1.02 -0.77 E G w
A-1 1 8.22 3.45 16.75 -12.60 Kg/cm2 Kg/cm2 Kg/cm2
0.99 -0.74 Kg/cm2 Kg/cm2 Kg/cm2 Kg/m3
___ ______________ _________ _________
_________ _________ _________ _________
_________
LOAD COMBINATIONS 1 3000PSI 210 4200 4200
4200 218540 87430 2400.0
No Load combination
______
__________________________________________

1 1.4D0 + 1.4DL
2 1.2D0 + 1.2DL + 1.6LL
3 1.2D0 + 1.2DL + .5LL + WLX
4 1.2D0 + 1.2DL + .5LL - WLX COLUMN SECTIONS
1 14 #3 @ 14 cm (ctr) 1 (h)
Number of prismatic sections = 1 Bot 32 4.91 4.94 1.25 0.0100 13.50

Sec Name Shape b h tw tf P1


P2 A I2 I3 J B-5 1 3.70 3.10 1 30x45 8 #3 @ 7 cm
(cm) (cm) (cm) (cm) (cm) (end) 2 (b) Top 1 9.29 0.27 0.23 0.0100
(cm) (cm2) (cm4) (cm4) (cm4) 13.50
___ ____________ _______ ______ ______ 1 14 #3 @ 14 cm (ctr) 1 (h)
______ ______ ______ ______ ________ __________ Bot 23 8.51 4.66 0.98 0.0100 13.50
__________ _________

1 C30X45 Rectang 30.00 45.00 - - - A-5 1 3.70 3.10 1 30x45 8 #3 @ 7 cm


- 1350.0 227812 101250 234900 (end) 2 (b) Top 1 9.29 0.27 0.23 0.0100
13.50
1 14 #3 @ 14 cm (ctr) 1 (h)
Bot 26 8.51 4.68 0.98 0.0100 13.50

Design Results - Columns (DES)


B-3 1 3.70 3.10 1 30x45 8 #3 @ 7 cm
(end) 2 (b) Top 1 9.30 0.27 0.23 0.0100
13.50
TRANSVERSE 1 14 #3 @ 14 cm (ctr) 1 (h)
REINFORCEMENT LONGITUDINAL Bot 25 8.51 4.66 0.99 0.0100 13.50
REINFORCEMENT
------------------------- -------
-------------------------------------------- A-3 1 3.70 3.10 1 30x45 8 #3 @ 7 cm
Column Story L Lu Sec bxh TIES (end) 2 (b) Top 1 9.30 0.27 0.23 0.0100
XTIES Sec LdCmb Pu Mu2 Mu3 RHO As 13.50
(m) (m) Mat (cm) 1 14 #3 @ 14 cm (ctr) 1 (h)
critc (ton) (ton-m) (ton-m) - (cm2) Bot 24 8.51 4.68 0.99 0.0100 13.50
_______ ____ ____ ____ ___ ______
__________________ _____ ___ ____ ______
______ ______ ______ ______ B-2 1 3.70 3.10 1 30x45 8 #3 @ 7 cm
(end) 2 (b) Top 19 6.61 0.19 3.24 0.0100
13.50
B-7 1 3.70 3.10 1 30x45 8 #3 @ 7 cm 1 14 #3 @ 14 cm (ctr) 1 (h)
(end) 2 (b) Top 24 5.65 5.58 0.70 0.0100 Bot 23 7.14 4.99 1.38 0.0100 13.50
13.50
1 14 #3 @ 14 cm (ctr) 1 (h)
Bot 24 5.65 8.47 0.71 0.0100 13.50 A-2 1 3.70 3.10 1 30x45 8 #3 @ 7 cm
(end) 2 (b) Top 19 6.64 0.19 3.15 0.0100
13.50
A-7 1 3.70 3.10 1 30x45 8 #3 @ 7 cm 1 14 #3 @ 14 cm (ctr) 1 (h)
(end) 2 (b) Top 23 4.98 5.58 0.50 0.0100 Bot 34 4.92 4.94 1.25 0.0100 13.50
13.50
1 14 #3 @ 14 cm (ctr) 1 (h)
Bot 23 4.98 8.47 0.74 0.0100 13.50 B-1 1 3.70 3.10 1 30x45 8 #3 @ 7 cm
(end) 2 (b) Top 24 4.98 5.64 0.50 0.0100
13.50
B-6 1 3.70 3.10 1 30x45 8 #3 @ 7 cm 1 14 #3 @ 14 cm (ctr) 1 (h)
(end) 2 (b) Top 20 6.64 0.19 3.15 0.0100 Bot 24 4.98 8.58 0.74 0.0100 13.50
13.50
1 14 #3 @ 14 cm (ctr) 1 (h)
Bot 25 7.13 4.99 1.38 0.0100 13.50 A-1 1 3.70 3.10 1 30x45 8 #3 @ 7 cm
(end) 2 (b) Top 23 5.65 4.70 0.58 0.0100
13.50
A-6 1 3.70 3.10 1 30x45 8 #3 @ 7 cm 1 14 #3 @ 14 cm (ctr) 1 (h)
(end) 2 (b) Top 20 6.60 0.19 3.24 0.0100 Bot 23 5.65 7.15 0.59 0.0100 13.50
13.50
A-1 13 #3 @ 7.5 7 #3 @
BEAM SECTIONS 17.5 13 #3 @ 7.5 A-2

Number of prismatic sections = 1


BEAM: A(2-3) FLOOR: 1
Sec Name Shape b h tw tf P1
P2 A I2 I3 J =============================================
(cm) (cm) (cm) (cm) (cm) =============================================
(cm) (cm2) (cm4) (cm4) (cm4) =======================
___ ____________ _______ ______ ______ Length: L = 6.29 m a = 0.15 m
______ ______ ______ ______ ________ __________ Section: b = 30.0 cm Sec: V30X45
__________ _________ Lu = 5.99 m c = 0.15 m h=
45.0 cm Mat: 3000PSI
1 V30X45 Rectang 30.00 45.00 - - - ----------------------------------------------------
- 1350.0 227812 101250 234900 --------------------------------------------
X, m: 0.15 0.75 1.35 1.95 2.55
3.15 3.74 4.34 4.94 5.54 6.14
Mu(-), ton-m: -1.38 -0.65 -0.12 0.00
0.00 0.00 0.00 0.00 -0.12 -0.65 -1.38
Design Results - Beams (DES) Mu(+), ton-m: 0.00 0.00 0.04 0.34
0.59 0.68 0.59 0.34 0.04 0.00 0.00
As(-), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
BEAM: A(1-2) FLOOR: 1 As(+), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
============================================= Vu, ton: 1.18 1.09 0.82 0.54 0.27
============================================= 0.00 0.27 0.54 0.82 1.09 1.18
======================= Tu, ton-m: 0.00 0.00 0.00 0.00 0.00
Length: L = 3.46 m a = 0.15 m 0.00 0.00 0.00 0.00 0.00 0.00
Section: b = 30.0 cm Sec: V30X45 Stirrup: #3 #3 #3 #3 #3
Lu = 3.16 m c = 0.15 m h= #3 #3 #3 #3 #3 #3
45.0 cm Mat: 3000PSI Spacing, cm: 7.50 7.50 17.50 17.50
---------------------------------------------------- 17.50 17.50 17.50 17.50 17.50 7.50 7.50
--------------------------------------------
X, m: 0.15 0.47 0.78 1.10 1.41 _____________________________________________
1.73 2.05 2.36 2.68 2.99 3.31 _________________________________________
Mu(-), ton-m: -0.39 -0.18 -0.04 0.00 DESIGN
0.00 0.00 0.00 0.00 -0.04 -0.18 -0.39
Mu(+), ton-m: 0.00 0.00 0.02 0.09 -------------------------------------------------
0.16 0.19 0.16 0.09 0.02 0.00 0.00 -------------------------------------
As(-), cm2: 3.92 3.92 3.92 3.92 3.92 A-2 13 #3 @ 7.5 23 #3 @
3.92 3.92 3.92 3.92 3.92 3.92 17.5 13 #3 @ 7.5 A-3
As(+), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
Vu, ton: 0.54 0.54 0.43 0.29 0.14 BEAM: A(3-5) FLOOR: 1
0.00 0.14 0.29 0.43 0.54 0.54
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 =============================================
0.00 0.00 0.00 0.00 0.00 0.00 =============================================
Stirrup: #3 #3 #3 #3 #3 =======================
#3 #3 #3 #3 #3 #3 Length: L = 6.23 m a = 0.15 m
Spacing, cm: 7.50 7.50 7.50 17.50 Section: b = 30.0 cm Sec: V30X45
17.50 17.50 17.50 17.50 7.50 7.50 7.50 Lu = 5.93 m c = 0.15 m h=
45.0 cm Mat: 3000PSI
_____________________________________________ ----------------------------------------------------
_________________________________________ --------------------------------------------
DESIGN X, m: 0.15 0.74 1.34 1.93 2.52
3.12 3.71 4.30 4.89 5.49 6.08
------------------------------------------------- Mu(-), ton-m: -1.15 -0.53 -0.10 0.00
------------------------------------- 0.00 0.00 0.00 0.00 -0.09 -0.53 -1.15
Mu(+), ton-m: 0.00 0.00 0.04 0.28 -------------------------------------------------
0.47 0.54 0.47 0.28 0.04 0.00 0.00 -------------------------------------
As(-), cm2: 3.92 3.92 3.92 3.92 3.92 A-5 13 #3 @ 7.5 23 #3 @
3.92 3.92 3.92 3.92 3.92 3.92 17.5 13 #3 @ 7.5 A-6
As(+), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
Vu, ton: 1.01 0.92 0.67 0.43 0.21 BEAM: A(6-7) FLOOR: 1
0.01 0.21 0.43 0.67 0.92 1.01
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 =============================================
0.00 0.00 0.00 0.00 0.00 0.00 =============================================
Stirrup: #3 #3 #3 #3 #3 =======================
#3 #3 #3 #3 #3 #3 Length: L = 3.46 m a = 0.15 m
Spacing, cm: 7.50 7.50 17.50 17.50 Section: b = 30.0 cm Sec: V30X45
17.50 17.50 17.50 17.50 17.50 7.50 7.50 Lu = 3.16 m c = 0.15 m h=
45.0 cm Mat: 3000PSI
_____________________________________________ ----------------------------------------------------
_________________________________________ --------------------------------------------
DESIGN X, m: 0.15 0.47 0.78 1.10 1.41
1.73 2.05 2.36 2.68 2.99 3.31
------------------------------------------------- Mu(-), ton-m: -0.39 -0.18 -0.04 0.00
------------------------------------- 0.00 0.00 0.00 0.00 -0.04 -0.18 -0.39
A-3 13 #3 @ 7.5 23 #3 @ Mu(+), ton-m: 0.00 0.00 0.02 0.09
17.5 13 #3 @ 7.5 A-5 0.16 0.19 0.16 0.09 0.02 0.00 0.00
As(-), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
BEAM: A(5-6) FLOOR: 1 As(+), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
============================================= Vu, ton: 0.54 0.54 0.43 0.29 0.14
============================================= 0.00 0.14 0.29 0.43 0.54 0.54
======================= Tu, ton-m: 0.00 0.00 0.00 0.00 0.00
Length: L = 6.28 m a = 0.15 m 0.00 0.00 0.00 0.00 0.00 0.00
Section: b = 30.0 cm Sec: V30X45 Stirrup: #3 #3 #3 #3 #3
Lu = 5.98 m c = 0.15 m h= #3 #3 #3 #3 #3 #3
45.0 cm Mat: 3000PSI Spacing, cm: 7.50 7.50 7.50 17.50
---------------------------------------------------- 17.50 17.50 17.50 17.50 7.50 7.50 7.50
--------------------------------------------
X, m: 0.15 0.75 1.35 1.94 2.54 _____________________________________________
3.14 3.74 4.34 4.93 5.53 6.13 _________________________________________
Mu(-), ton-m: -1.37 -0.65 -0.12 0.00 DESIGN
0.00 0.00 0.00 0.00 -0.12 -0.65 -1.37
Mu(+), ton-m: 0.00 0.00 0.04 0.34 -------------------------------------------------
0.59 0.68 0.59 0.34 0.04 0.00 0.00 -------------------------------------
As(-), cm2: 3.92 3.92 3.92 3.92 3.92 A-6 13 #3 @ 7.5 7 #3 @
3.92 3.92 3.92 3.92 3.92 3.92 17.5 13 #3 @ 7.5 A-7
As(+), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
Vu, ton: 1.18 1.09 0.81 0.54 0.27 BEAM: B(1-2) FLOOR: 1
0.00 0.27 0.54 0.81 1.09 1.18
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 =============================================
0.00 0.00 0.00 0.00 0.00 0.00 =============================================
Stirrup: #3 #3 #3 #3 #3 =======================
#3 #3 #3 #3 #3 #3 Length: L = 3.46 m a = 0.15 m
Spacing, cm: 7.50 7.50 17.50 17.50 Section: b = 30.0 cm Sec: V30X45
17.50 17.50 17.50 17.50 17.50 7.50 7.50 Lu = 3.16 m c = 0.15 m h=
45.0 cm Mat: 3000PSI
_____________________________________________ ----------------------------------------------------
_________________________________________ --------------------------------------------
DESIGN X, m: 0.15 0.47 0.78 1.10 1.41
1.73 2.05 2.36 2.68 2.99 3.31
Mu(-), ton-m: -0.39 -0.18 -0.04 0.00 DESIGN
0.00 0.00 0.00 0.00 -0.04 -0.18 -0.39
Mu(+), ton-m: 0.00 0.00 0.02 0.09 -------------------------------------------------
0.16 0.19 0.16 0.09 0.02 0.00 0.00 -------------------------------------
As(-), cm2: 3.92 3.92 3.92 3.92 3.92 B-2 13 #3 @ 7.5 23 #3 @
3.92 3.92 3.92 3.92 3.92 3.92 17.5 13 #3 @ 7.5 B-3
As(+), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
Vu, ton: 0.54 0.54 0.43 0.29 0.14 BEAM: B(3-5) FLOOR: 1
0.00 0.14 0.29 0.43 0.54 0.54
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 =============================================
0.00 0.00 0.00 0.00 0.00 0.00 =============================================
Stirrup: #3 #3 #3 #3 #3 =======================
#3 #3 #3 #3 #3 #3 Length: L = 6.23 m a = 0.15 m
Spacing, cm: 7.50 7.50 7.50 17.50 Section: b = 30.0 cm Sec: V30X45
17.50 17.50 17.50 17.50 7.50 7.50 7.50 Lu = 5.93 m c = 0.15 m h=
45.0 cm Mat: 3000PSI
_____________________________________________ ----------------------------------------------------
_________________________________________ --------------------------------------------
DESIGN X, m: 0.15 0.74 1.34 1.93 2.52
3.12 3.71 4.30 4.89 5.49 6.08
------------------------------------------------- Mu(-), ton-m: -1.15 -0.53 -0.10 0.00
------------------------------------- 0.00 0.00 0.00 0.00 -0.09 -0.53 -1.15
B-1 13 #3 @ 7.5 7 #3 @ Mu(+), ton-m: 0.00 0.00 0.04 0.28
17.5 13 #3 @ 7.5 B-2 0.47 0.54 0.47 0.28 0.04 0.00 0.00
As(-), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
BEAM: B(2-3) FLOOR: 1 As(+), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
============================================= Vu, ton: 1.01 0.92 0.67 0.43 0.21
============================================= 0.01 0.21 0.43 0.67 0.92 1.01
======================= Tu, ton-m: 0.00 0.00 0.00 0.00 0.00
Length: L = 6.29 m a = 0.15 m 0.00 0.00 0.00 0.00 0.00 0.00
Section: b = 30.0 cm Sec: V30X45 Stirrup: #3 #3 #3 #3 #3
Lu = 5.99 m c = 0.15 m h= #3 #3 #3 #3 #3 #3
45.0 cm Mat: 3000PSI Spacing, cm: 7.50 7.50 17.50 17.50
---------------------------------------------------- 17.50 17.50 17.50 17.50 17.50 7.50 7.50
--------------------------------------------
X, m: 0.15 0.75 1.35 1.95 2.55 _____________________________________________
3.15 3.74 4.34 4.94 5.54 6.14 _________________________________________
Mu(-), ton-m: -1.38 -0.65 -0.12 0.00 DESIGN
0.00 0.00 0.00 0.00 -0.12 -0.65 -1.38
Mu(+), ton-m: 0.00 0.00 0.04 0.34 -------------------------------------------------
0.59 0.68 0.59 0.34 0.04 0.00 0.00 -------------------------------------
As(-), cm2: 3.92 3.92 3.92 3.92 3.92 B-3 13 #3 @ 7.5 23 #3 @
3.92 3.92 3.92 3.92 3.92 3.92 17.5 13 #3 @ 7.5 B-5
As(+), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
Vu, ton: 1.18 1.09 0.82 0.54 0.27 BEAM: B(5-6) FLOOR: 1
0.00 0.27 0.54 0.82 1.09 1.18
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 =============================================
0.00 0.00 0.00 0.00 0.00 0.00 =============================================
Stirrup: #3 #3 #3 #3 #3 =======================
#3 #3 #3 #3 #3 #3 Length: L = 6.28 m a = 0.15 m
Spacing, cm: 7.50 7.50 17.50 17.50 Section: b = 30.0 cm Sec: V30X45
17.50 17.50 17.50 17.50 17.50 7.50 7.50 Lu = 5.98 m c = 0.15 m h=
45.0 cm Mat: 3000PSI
_____________________________________________ ----------------------------------------------------
_________________________________________ --------------------------------------------
X, m: 0.15 0.75 1.35 1.94 2.54
3.14 3.74 4.34 4.93 5.53 6.13 _____________________________________________
Mu(-), ton-m: -1.37 -0.65 -0.12 0.00 _________________________________________
0.00 0.00 0.00 0.00 -0.12 -0.65 -1.37 DESIGN
Mu(+), ton-m: 0.00 0.00 0.04 0.34
0.59 0.68 0.59 0.34 0.04 0.00 0.00 -------------------------------------------------
As(-), cm2: 3.92 3.92 3.92 3.92 3.92 -------------------------------------
3.92 3.92 3.92 3.92 3.92 3.92 B-6 13 #3 @ 7.5 7 #3 @
As(+), cm2: 3.92 3.92 3.92 3.92 3.92 17.5 13 #3 @ 7.5 B-7
3.92 3.92 3.92 3.92 3.92 3.92
Vu, ton: 1.18 1.09 0.81 0.54 0.27
0.00 0.27 0.54 0.81 1.09 1.18 BEAM: A(1-2) FLOOR: 2
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 =============================================
Stirrup: #3 #3 #3 #3 #3 =============================================
#3 #3 #3 #3 #3 #3 =======================
Spacing, cm: 7.50 7.50 17.50 17.50 Length: L = 3.46 m a = 0.15 m
17.50 17.50 17.50 17.50 17.50 7.50 7.50 Section: b = 30.0 cm Sec: V30X45
Lu = 3.16 m c = 0.15 m h=
_____________________________________________ 45.0 cm Mat: 3000PSI
_________________________________________ ----------------------------------------------------
DESIGN --------------------------------------------
X, m: 0.15 0.47 0.78 1.10 1.41
------------------------------------------------- 1.73 2.05 2.36 2.68 2.99 3.31
------------------------------------- Mu(-), ton-m: -2.07 -1.48 -1.00 -0.95 -
B-5 13 #3 @ 7.5 23 #3 @ 0.95 -0.95 -0.95 -0.95 -1.78 -2.74 -3.81
17.5 13 #3 @ 7.5 B-6 Mu(+), ton-m: 1.94 1.83 1.65 1.36
0.97 0.95 0.95 0.95 0.95 0.95 1.90
As(-), cm2: 3.92 3.92 3.92 3.92 3.92
BEAM: B(6-7) FLOOR: 1 3.92 3.92 3.92 3.92 3.92 3.92
As(+), cm2: 3.92 3.92 3.92 3.92 3.92
============================================= 3.92 3.92 3.92 3.92 3.92 3.92
============================================= Vu, ton: 3.10 3.10 2.84 2.58 2.91
======================= 3.26 3.61 3.95 4.30 4.57 4.57
Length: L = 3.46 m a = 0.15 m Tu, ton-m: 0.04 0.04 0.04 0.04 0.04
Section: b = 30.0 cm Sec: V30X45 0.04 0.04 0.04 0.04 0.04 0.04
Lu = 3.16 m c = 0.15 m h= Stirrup: #3 #3 #3 #3 #3
45.0 cm Mat: 3000PSI #3 #3 #3 #3 #3 #3
---------------------------------------------------- Spacing, cm: 7.50 7.50 7.50 17.50
-------------------------------------------- 17.50 17.50 17.50 17.50 7.50 7.50 7.50
X, m: 0.15 0.47 0.78 1.10 1.41
1.73 2.05 2.36 2.68 2.99 3.31 _____________________________________________
Mu(-), ton-m: -0.39 -0.18 -0.04 0.00 _________________________________________
0.00 0.00 0.00 0.00 -0.04 -0.18 -0.39 DESIGN
Mu(+), ton-m: 0.00 0.00 0.02 0.09
0.16 0.19 0.16 0.09 0.02 0.00 0.00 -------------------------------------------------
As(-), cm2: 3.92 3.92 3.92 3.92 3.92 -------------------------------------
3.92 3.92 3.92 3.92 3.92 3.92 A-1 13 #3 @ 7.5 7 #3 @
As(+), cm2: 3.92 3.92 3.92 3.92 3.92 17.5 13 #3 @ 7.5 A-2
3.92 3.92 3.92 3.92 3.92 3.92
Vu, ton: 0.54 0.54 0.43 0.29 0.14
0.00 0.14 0.29 0.43 0.54 0.54 BEAM: A(2-3) FLOOR: 2
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 =============================================
Stirrup: #3 #3 #3 #3 #3 =============================================
#3 #3 #3 #3 #3 #3 =======================
Spacing, cm: 7.50 7.50 7.50 17.50 Length: L = 6.29 m a = 0.15 m
17.50 17.50 17.50 17.50 7.50 7.50 7.50 Section: b = 30.0 cm Sec: V30X45
Lu = 5.99 m c = 0.15 m h= Stirrup: #3 #3 #3 #3 #3
45.0 cm Mat: 3000PSI #3 #3 #3 #3 #3 #3
---------------------------------------------------- Spacing, cm: 7.50 7.50 17.50 17.50
-------------------------------------------- 17.50 17.50 17.50 17.50 17.50 7.50 7.50
X, m: 0.15 0.75 1.35 1.95 2.55
3.15 3.74 4.34 4.94 5.54 6.14 _____________________________________________
Mu(-), ton-m: -3.67 -1.78 -1.13 -1.13 - _________________________________________
1.13 -1.13 -1.13 -1.13 -1.13 -2.49 -4.53 DESIGN
Mu(+), ton-m: 1.84 1.13 1.13 1.46
2.00 2.18 1.84 1.32 1.13 1.13 2.26 -------------------------------------------------
As(-), cm2: 3.92 3.92 3.92 3.92 3.92 -------------------------------------
3.92 3.92 3.92 3.92 3.92 3.92 A-3 13 #3 @ 7.5 23 #3 @
As(+), cm2: 3.92 3.92 3.92 3.92 3.92 17.5 13 #3 @ 7.5 A-5
3.92 3.92 3.92 3.92 3.92 3.92
Vu, ton: 4.33 4.10 3.41 2.72 2.04
1.60 2.29 2.97 3.66 4.35 4.59 BEAM: A(5-6) FLOOR: 2
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 =============================================
Stirrup: #3 #3 #3 #3 #3 =============================================
#3 #3 #3 #3 #3 #3 =======================
Spacing, cm: 7.50 7.50 17.50 17.50 Length: L = 6.28 m a = 0.15 m
17.50 17.50 17.50 17.50 17.50 7.50 7.50 Section: b = 30.0 cm Sec: V30X45
Lu = 5.98 m c = 0.15 m h=
_____________________________________________ 45.0 cm Mat: 3000PSI
_________________________________________ ----------------------------------------------------
DESIGN --------------------------------------------
X, m: 0.15 0.75 1.35 1.94 2.54
------------------------------------------------- 3.14 3.74 4.34 4.93 5.53 6.13
------------------------------------- Mu(-), ton-m: -4.52 -2.49 -1.13 -1.13 -
A-2 13 #3 @ 7.5 23 #3 @ 1.13 -1.13 -1.13 -1.13 -1.13 -1.78 -3.66
17.5 13 #3 @ 7.5 A-3 Mu(+), ton-m: 2.26 1.13 1.13 1.32
1.83 2.17 2.00 1.46 1.13 1.13 1.83
As(-), cm2: 3.92 3.92 3.92 3.92 3.92
BEAM: A(3-5) FLOOR: 2 3.92 3.92 3.92 3.92 3.92 3.92
As(+), cm2: 3.92 3.92 3.92 3.92 3.92
============================================= 3.92 3.92 3.92 3.92 3.92 3.92
============================================= Vu, ton: 4.58 4.34 3.66 2.97 2.29
======================= 1.60 2.03 2.72 3.40 4.09 4.33
Length: L = 6.23 m a = 0.15 m Tu, ton-m: 0.00 0.00 0.00 0.00 0.00
Section: b = 30.0 cm Sec: V30X45 0.00 0.00 0.00 0.00 0.00 0.00
Lu = 5.93 m c = 0.15 m h= Stirrup: #3 #3 #3 #3 #3
45.0 cm Mat: 3000PSI #3 #3 #3 #3 #3 #3
---------------------------------------------------- Spacing, cm: 7.50 7.50 17.50 17.50
-------------------------------------------- 17.50 17.50 17.50 17.50 17.50 7.50 7.50
X, m: 0.15 0.74 1.34 1.93 2.52
3.12 3.71 4.30 4.89 5.49 6.08 _____________________________________________
Mu(-), ton-m: -4.54 -2.55 -1.14 -1.14 - _________________________________________
1.14 -1.14 -1.14 -1.14 -1.14 -2.55 -4.54 DESIGN
Mu(+), ton-m: 2.27 1.14 1.14 1.21
1.61 1.82 1.60 1.21 1.14 1.14 2.27 -------------------------------------------------
As(-), cm2: 3.92 3.92 3.92 3.92 3.92 -------------------------------------
3.92 3.92 3.92 3.92 3.92 3.92 A-5 13 #3 @ 7.5 23 #3 @
As(+), cm2: 3.92 3.92 3.92 3.92 3.92 17.5 13 #3 @ 7.5 A-6
3.92 3.92 3.92 3.92 3.92 3.92
Vu, ton: 4.55 4.31 3.63 2.96 2.28
1.62 2.27 2.95 3.63 4.31 4.54 BEAM: A(6-7) FLOOR: 2
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 =============================================
============================================= Vu, ton: 3.10 3.10 2.84 2.58 2.91
======================= 3.26 3.61 3.95 4.30 4.57 4.57
Length: L = 3.46 m a = 0.15 m Tu, ton-m: 0.04 0.04 0.04 0.04 0.04
Section: b = 30.0 cm Sec: V30X45 0.04 0.04 0.04 0.04 0.04 0.04
Lu = 3.16 m c = 0.15 m h= Stirrup: #3 #3 #3 #3 #3
45.0 cm Mat: 3000PSI #3 #3 #3 #3 #3 #3
---------------------------------------------------- Spacing, cm: 7.50 7.50 7.50 17.50
-------------------------------------------- 17.50 17.50 17.50 17.50 7.50 7.50 7.50
X, m: 0.15 0.47 0.78 1.10 1.41
1.73 2.05 2.36 2.68 2.99 3.31 _____________________________________________
Mu(-), ton-m: -3.80 -2.74 -1.77 -0.95 - _________________________________________
0.95 -0.95 -0.95 -0.95 -1.00 -1.48 -2.07 DESIGN
Mu(+), ton-m: 1.90 0.95 0.95 0.95
0.95 0.95 0.97 1.36 1.65 1.83 1.94 -------------------------------------------------
As(-), cm2: 3.92 3.92 3.92 3.92 3.92 -------------------------------------
3.92 3.92 3.92 3.92 3.92 3.92 B-1 13 #3 @ 7.5 7 #3 @
As(+), cm2: 3.92 3.92 3.92 3.92 3.92 17.5 13 #3 @ 7.5 B-2
3.92 3.92 3.92 3.92 3.92 3.92
Vu, ton: 4.56 4.56 4.30 3.95 3.60
3.25 2.91 2.58 2.84 3.10 3.10 BEAM: B(2-3) FLOOR: 2
Tu, ton-m: 0.04 0.04 0.04 0.04 0.04
0.04 0.04 0.04 0.04 0.04 0.04 =============================================
Stirrup: #3 #3 #3 #3 #3 =============================================
#3 #3 #3 #3 #3 #3 =======================
Spacing, cm: 7.50 7.50 7.50 17.50 Length: L = 6.29 m a = 0.15 m
17.50 17.50 17.50 17.50 7.50 7.50 7.50 Section: b = 30.0 cm Sec: V30X45
Lu = 5.99 m c = 0.15 m h=
_____________________________________________ 45.0 cm Mat: 3000PSI
_________________________________________ ----------------------------------------------------
DESIGN --------------------------------------------
X, m: 0.15 0.75 1.35 1.95 2.55
------------------------------------------------- 3.15 3.74 4.34 4.94 5.54 6.14
------------------------------------- Mu(-), ton-m: -3.67 -1.78 -1.13 -1.13 -
A-6 13 #3 @ 7.5 7 #3 @ 1.13 -1.13 -1.13 -1.13 -1.13 -2.49 -4.53
17.5 13 #3 @ 7.5 A-7 Mu(+), ton-m: 1.84 1.13 1.13 1.46
2.00 2.18 1.84 1.32 1.13 1.13 2.26
As(-), cm2: 3.92 3.92 3.92 3.92 3.92
BEAM: B(1-2) FLOOR: 2 3.92 3.92 3.92 3.92 3.92 3.92
As(+), cm2: 3.92 3.92 3.92 3.92 3.92
============================================= 3.92 3.92 3.92 3.92 3.92 3.92
============================================= Vu, ton: 4.33 4.10 3.41 2.72 2.04
======================= 1.60 2.29 2.97 3.66 4.35 4.59
Length: L = 3.46 m a = 0.15 m Tu, ton-m: 0.00 0.00 0.00 0.00 0.00
Section: b = 30.0 cm Sec: V30X45 0.00 0.00 0.00 0.00 0.00 0.00
Lu = 3.16 m c = 0.15 m h= Stirrup: #3 #3 #3 #3 #3
45.0 cm Mat: 3000PSI #3 #3 #3 #3 #3 #3
---------------------------------------------------- Spacing, cm: 7.50 7.50 17.50 17.50
-------------------------------------------- 17.50 17.50 17.50 17.50 17.50 7.50 7.50
X, m: 0.15 0.47 0.78 1.10 1.41
1.73 2.05 2.36 2.68 2.99 3.31 _____________________________________________
Mu(-), ton-m: -2.07 -1.48 -1.00 -0.95 - _________________________________________
0.95 -0.95 -0.95 -0.95 -1.78 -2.74 -3.81 DESIGN
Mu(+), ton-m: 1.94 1.83 1.65 1.36
0.97 0.95 0.95 0.95 0.95 0.95 1.90 -------------------------------------------------
As(-), cm2: 3.92 3.92 3.92 3.92 3.92 -------------------------------------
3.92 3.92 3.92 3.92 3.92 3.92 B-2 13 #3 @ 7.5 23 #3 @
As(+), cm2: 3.92 3.92 3.92 3.92 3.92 17.5 13 #3 @ 7.5 B-3
3.92 3.92 3.92 3.92 3.92 3.92
BEAM: B(3-5) FLOOR: 2 As(+), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
============================================= Vu, ton: 4.58 4.34 3.66 2.97 2.29
============================================= 1.60 2.03 2.72 3.40 4.09 4.33
======================= Tu, ton-m: 0.00 0.00 0.00 0.00 0.00
Length: L = 6.23 m a = 0.15 m 0.00 0.00 0.00 0.00 0.00 0.00
Section: b = 30.0 cm Sec: V30X45 Stirrup: #3 #3 #3 #3 #3
Lu = 5.93 m c = 0.15 m h= #3 #3 #3 #3 #3 #3
45.0 cm Mat: 3000PSI Spacing, cm: 7.50 7.50 17.50 17.50
---------------------------------------------------- 17.50 17.50 17.50 17.50 17.50 7.50 7.50
--------------------------------------------
X, m: 0.15 0.74 1.34 1.93 2.52 _____________________________________________
3.12 3.71 4.30 4.89 5.49 6.08 _________________________________________
Mu(-), ton-m: -4.54 -2.55 -1.14 -1.14 - DESIGN
1.14 -1.14 -1.14 -1.14 -1.14 -2.55 -4.54
Mu(+), ton-m: 2.27 1.14 1.14 1.21 -------------------------------------------------
1.61 1.82 1.60 1.21 1.14 1.14 2.27 -------------------------------------
As(-), cm2: 3.92 3.92 3.92 3.92 3.92 B-5 13 #3 @ 7.5 23 #3 @
3.92 3.92 3.92 3.92 3.92 3.92 17.5 13 #3 @ 7.5 B-6
As(+), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
Vu, ton: 4.55 4.31 3.63 2.96 2.28 BEAM: B(6-7) FLOOR: 2
1.62 2.27 2.95 3.63 4.31 4.54
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 =============================================
0.00 0.00 0.00 0.00 0.00 0.00 =============================================
Stirrup: #3 #3 #3 #3 #3 =======================
#3 #3 #3 #3 #3 #3 Length: L = 3.46 m a = 0.15 m
Spacing, cm: 7.50 7.50 17.50 17.50 Section: b = 30.0 cm Sec: V30X45
17.50 17.50 17.50 17.50 17.50 7.50 7.50 Lu = 3.16 m c = 0.15 m h=
45.0 cm Mat: 3000PSI
_____________________________________________ ----------------------------------------------------
_________________________________________ --------------------------------------------
DESIGN X, m: 0.15 0.47 0.78 1.10 1.41
1.73 2.05 2.36 2.68 2.99 3.31
------------------------------------------------- Mu(-), ton-m: -3.80 -2.74 -1.77 -0.95 -
------------------------------------- 0.95 -0.95 -0.95 -0.95 -1.00 -1.48 -2.07
B-3 13 #3 @ 7.5 23 #3 @ Mu(+), ton-m: 1.90 0.95 0.95 0.95
17.5 13 #3 @ 7.5 B-5 0.95 0.95 0.97 1.36 1.65 1.83 1.94
As(-), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
BEAM: B(5-6) FLOOR: 2 As(+), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
============================================= Vu, ton: 4.56 4.56 4.30 3.95 3.60
============================================= 3.25 2.91 2.58 2.84 3.10 3.10
======================= Tu, ton-m: 0.04 0.04 0.04 0.04 0.04
Length: L = 6.28 m a = 0.15 m 0.04 0.04 0.04 0.04 0.04 0.04
Section: b = 30.0 cm Sec: V30X45 Stirrup: #3 #3 #3 #3 #3
Lu = 5.98 m c = 0.15 m h= #3 #3 #3 #3 #3 #3
45.0 cm Mat: 3000PSI Spacing, cm: 7.50 7.50 7.50 17.50
---------------------------------------------------- 17.50 17.50 17.50 17.50 7.50 7.50 7.50
--------------------------------------------
X, m: 0.15 0.75 1.35 1.94 2.54 _____________________________________________
3.14 3.74 4.34 4.93 5.53 6.13 _________________________________________
Mu(-), ton-m: -4.52 -2.49 -1.13 -1.13 - DESIGN
1.13 -1.13 -1.13 -1.13 -1.13 -1.78 -3.66
Mu(+), ton-m: 2.26 1.13 1.13 1.32 -------------------------------------------------
1.83 2.17 2.00 1.46 1.13 1.13 1.83 -------------------------------------
As(-), cm2: 3.92 3.92 3.92 3.92 3.92 B-6 13 #3 @ 7.5 7 #3 @
3.92 3.92 3.92 3.92 3.92 3.92 17.5 13 #3 @ 7.5 B-7
As(-), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
BEAM: 1(A-B) FLOOR: 1 As(+), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
============================================= Vu, ton: 1.33 1.20 0.90 0.60 0.30
============================================= 0.00 0.30 0.60 0.90 1.20 1.33
======================= Tu, ton-m: 0.00 0.00 0.00 0.00 0.00
Length: L = 7.08 m a = 0.23 m 0.00 0.00 0.00 0.00 0.00 0.00
Section: b = 30.0 cm Sec: V30X45 Stirrup: #3 #3 #3 #3 #3
Lu = 6.63 m c = 0.23 m h= #3 #3 #3 #3 #3 #3
45.0 cm Mat: 3000PSI Spacing, cm: 7.50 7.50 17.50 17.50
---------------------------------------------------- 17.50 17.50 17.50 17.50 17.50 7.50 7.50
--------------------------------------------
X, m: 0.23 0.89 1.55 2.21 2.88 _____________________________________________
3.54 4.20 4.87 5.53 6.19 6.86 _________________________________________
Mu(-), ton-m: -1.69 -0.80 -0.17 0.00 DESIGN
0.00 0.00 0.00 0.00 -0.17 -0.80 -1.69
Mu(+), ton-m: 0.00 0.00 0.07 0.41 -------------------------------------------------
0.72 0.83 0.72 0.41 0.07 0.00 0.00 -------------------------------------
As(-), cm2: 3.92 3.92 3.92 3.92 3.92 A-7 13 #3 @ 7.5 27 #3 @
3.92 3.92 3.92 3.92 3.92 3.92 17.5 13 #3 @ 7.5 B-7
As(+), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
Vu, ton: 1.33 1.20 0.90 0.60 0.30 BEAM: 1(A-B) FLOOR: 2
0.00 0.30 0.60 0.90 1.20 1.33
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 =============================================
0.00 0.00 0.00 0.00 0.00 0.00 =============================================
Stirrup: #3 #3 #3 #3 #3 =======================
#3 #3 #3 #3 #3 #3 Length: L = 7.08 m a = 0.23 m
Spacing, cm: 7.50 7.50 17.50 17.50 Section: b = 30.0 cm Sec: V30X45
17.50 17.50 17.50 17.50 17.50 7.50 7.50 Lu = 6.63 m c = 0.23 m h=
45.0 cm Mat: 3000PSI
_____________________________________________ ----------------------------------------------------
_________________________________________ --------------------------------------------
DESIGN X, m: 0.23 0.89 1.55 2.21 2.88
3.54 4.20 4.87 5.53 6.19 6.86
------------------------------------------------- Mu(-), ton-m: -5.60 -3.97 -2.52 -1.40 -
------------------------------------- 1.40 -1.40 -1.40 -1.40 -2.52 -3.97 -5.60
A-1 13 #3 @ 7.5 27 #3 @ Mu(+), ton-m: 3.51 3.21 2.81 2.37
17.5 13 #3 @ 7.5 B-1 1.76 1.40 1.76 2.37 2.81 3.21 3.51
As(-), cm2: 3.96 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.96
BEAM: 7(A-B) FLOOR: 1 As(+), cm2: 3.92 3.92 3.92 3.92 3.92
3.92 3.92 3.92 3.92 3.92 3.92
============================================= Vu, ton: 2.97 2.88 2.63 2.39 2.15
============================================= 1.91 2.15 2.39 2.63 2.88 2.97
======================= Tu, ton-m: 0.00 0.00 0.00 0.00 0.00
Length: L = 7.08 m a = 0.23 m 0.00 0.00 0.00 0.00 0.00 0.00
Section: b = 30.0 cm Sec: V30X45 Stirrup: #3 #3 #3 #3 #3
Lu = 6.63 m c = 0.23 m h= #3 #3 #3 #3 #3 #3
45.0 cm Mat: 3000PSI Spacing, cm: 7.50 7.50 17.50 17.50
---------------------------------------------------- 17.50 17.50 17.50 17.50 17.50 7.50 7.50
--------------------------------------------
X, m: 0.23 0.89 1.55 2.21 2.88 _____________________________________________
3.54 4.20 4.87 5.53 6.19 6.86 _________________________________________
Mu(-), ton-m: -1.69 -0.80 -0.17 0.00 DESIGN
0.00 0.00 0.00 0.00 -0.17 -0.80 -1.69
Mu(+), ton-m: 0.00 0.00 0.07 0.41 -------------------------------------------------
0.72 0.83 0.72 0.41 0.07 0.00 0.00 -------------------------------------
A-1 13 #3 @ 7.5 27 #3 @ Long-term due to Sus. load (SLds) D0 + DL +
17.5 13 #3 @ 7.5 B-1 .25LL
* Computed as Defl(DLS + LLs) - Defl(DLs)

BEAM: 7(A-B) FLOOR: 2 Units: Defl: Max. deflection


(cm), L: Beam length (m), h: Beam depth (cm)
=============================================
============================================= IMMEDIATE
======================= DEFLECTIONS ADDITIONAL LONG-TERM DEFLEC.
Length: L = 7.08 m a = 0.23 m Sus.Lds
Section: b = 30.0 cm Sec: V30X45 DLs Live Sut.Lds
Lu = 6.63 m c = 0.23 m h= 6 months 1-year 5-years
45.0 cm Mat: 3000PSI Beam Floor h L L/h Beam Type Deflc
---------------------------------------------------- Deflc Deflc Deflc Deflc Deflc
-------------------------------------------- ________ _____ ___ ____ ___ __________
X, m: 0.23 0.89 1.55 2.21 2.88 _____ _____ _____ ______ ______ ______
3.54 4.20 4.87 5.53 6.19 6.86
Mu(-), ton-m: -5.60 -3.97 -2.52 -1.40 - A(1-2) 1 45 3.46 8 EndJContin 0.002
1.40 -1.40 -1.40 -1.40 -2.52 -3.97 -5.60 0.000 0.002 0.002 0.002 0.003
Mu(+), ton-m: 3.51 3.21 2.81 2.37 A(2-3) 1 45 6.29 14 BothEndCnt 0.022
1.76 1.40 1.76 2.37 2.81 3.21 3.51 0.000 0.022 0.022 0.026 0.037
As(-), cm2: 3.96 3.92 3.92 3.92 3.92 A(3-5) 1 45 6.23 14 BothEndCnt 0.019
3.92 3.92 3.92 3.92 3.92 3.96 0.000 0.019 0.019 0.022 0.032
As(+), cm2: 3.92 3.92 3.92 3.92 3.92 A(5-6) 1 45 6.28 14 BothEndCnt 0.022
3.92 3.92 3.92 3.92 3.92 3.92 0.000 0.022 0.022 0.026 0.037
Vu, ton: 2.97 2.88 2.63 2.39 2.15 A(6-7) 1 45 3.46 8 EndIContin 0.002
1.91 2.15 2.39 2.63 2.88 2.97 0.000 0.002 0.002 0.002 0.003
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 B(1-2) 1 45 3.46 8 EndJContin 0.002
0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.002 0.002 0.002 0.003
Stirrup: #3 #3 #3 #3 #3 B(2-3) 1 45 6.29 14 BothEndCnt 0.022
#3 #3 #3 #3 #3 #3 0.000 0.022 0.022 0.026 0.037
Spacing, cm: 7.50 7.50 17.50 17.50 B(3-5) 1 45 6.23 14 BothEndCnt 0.019
17.50 17.50 17.50 17.50 17.50 7.50 7.50 0.000 0.019 0.019 0.022 0.032
B(5-6) 1 45 6.28 14 BothEndCnt 0.022
_____________________________________________ 0.000 0.022 0.022 0.026 0.037
_________________________________________ B(6-7) 1 45 3.46 8 EndIContin 0.002
DESIGN 0.000 0.002 0.002 0.002 0.003
A(1-2) 2 45 3.46 8 EndJContin 0.007
------------------------------------------------- 0.001 0.007 0.007 0.008 0.012
------------------------------------- A(2-3) 2 45 6.29 14 BothEndCnt 0.078
A-7 13 #3 @ 7.5 27 #3 @ 0.016 0.082 0.085 0.099 0.141
17.5 13 #3 @ 7.5 B-7 A(3-5) 2 45 6.23 14 BothEndCnt 0.061
0.012 0.064 0.065 0.076 0.109
A(5-6) 2 45 6.28 14 BothEndCnt 0.078
0.016 0.082 0.084 0.098 0.140
LONG-TERM BEAM DEFLECTIONS A(6-7) 2 45 3.46 8 EndIContin 0.007
0.001 0.007 0.007 0.008 0.012
PERMISSIBLE DEFLECTIONS B(1-2) 2 45 3.46 8 EndJContin 0.007
Immediate deflection due to Live Load . . . . . = 0.001 0.007 0.007 0.008 0.012
L/360 B(2-3) 2 45 6.29 14 BothEndCnt 0.078
Long-term deflection due to Sustained loads . . 0.016 0.082 0.085 0.099 0.141
= L/480 B(3-5) 2 45 6.23 14 BothEndCnt 0.061
0.012 0.064 0.065 0.076 0.109
TYPE OF DEFLECTION LOAD B(5-6) 2 45 6.28 14 BothEndCnt 0.078
COMBINATION 0.016 0.082 0.084 0.098 0.140
Immediate due to Dead load (DLs) D0 + DL B(6-7) 2 45 3.46 8 EndIContin 0.007
Immediate due to Live load (LLs)* LL 0.001 0.007 0.007 0.008 0.012
Immediate due to Sus. load (SLds) D0 + DL + 1(A-B) 1 45 7.08 16 SimpSupprt 0.033
.25LL 0.000 0.033 0.034 0.039 0.056
7(A-B) 1 45 7.08 16 SimpSupprt 0.033 0.27 L
0.000 0.033 0.034 0.039 0.056 7#4@19 cm 8.505 2.13
1(A-B) 2 45 7.08 16 SimpSupprt 0.063
0.000 0.063 0.065 0.075 0.108 A-6 1 1 1.35 1.50 35 0.23 B
7(A-B) 2 45 7.08 16 SimpSupprt 0.063 8#4@19 cm 9.450 2.08
0.000 0.063 0.065 0.075 0.108 0.27 L
7#4@19 cm 8.505 2.12
NOTE: All beam deflections are smaller than
maximum permissible deflection B-5 1 1 1.33 1.48 35 0.23 B
Depth, H, of all beams is larger than that 8#4@18 cm 9.293 1.91
recomemenden in Table 9.5(a) 0.27 L
7#4@19 cm 8.348 2.12

Immediate deflections are computed according A-5 1 1 1.33 1.48 35 0.23 B


to 9.5.2.3 with: 8#4@18 cm 9.293 1.91
Effective stiffness: E I = Ec . Ie 0.27 L
Ie = (Mcr/Ma)³ Ig + [1 - (Mcr/Ma)³] 7#4@19 cm 8.348 2.12
Icr
Mcr = fr Ig/Yt B-3 1 1 1.33 1.48 35 0.23 B
Icr = b(kd)³/3 + n As(d-kd)¹+(n- 8#4@18 cm 9.293 1.91
1)A's(kd-d')² 0.27 L
n = Es/Ec 7#4@19 cm 8.348 2.12
Long-term deflections are computed according
to 9.5.2.5 A-3 1 1 1.33 1.48 35 0.23 B
8#4@18 cm 9.293 1.91
0.27 L
Design results - Footings 7#4@19 cm 8.348 2.12

B-2 1 1 1.35 1.50 35 0.23 B


Footing Floor Mat B L h Vu1/ØVc1 8#4@19 cm 9.450 2.08
Dir Reinforcem As Mu 0.27 L
m m cm Vu2/ØVc2 - 7#4@20 cm 8.505 2.14
cm2 ton-m
_______ ____ ____ ______ ______ ______ A-2 1 1 1.35 1.50 35 0.23 B
______ ___ ___________ ______ ______ 8#4@19 cm 9.450 2.08
0.27 L
B-7 1 1 1.43 1.58 35 0.29 B 7#4@20 cm 8.505 2.12
8#4@20 cm 9.922 1.51
0.33 L B-1 1 1 1.43 1.58 35 0.29 B
8#4@18 cm 8.977 2.88 8#4@20 cm 9.922 1.51
0.33 L
A-7 1 1 1.45 1.60 35 0.28 B 8#4@18 cm 8.977 2.88
8#4@20 cm 10.08 1.54
0.33 L A-1 1 1 1.45 1.60 35 0.28 B
8#4@18 cm 9.135 2.89 8#4@20 cm 10.08 1.54
0.33 L
B-6 1 1 1.35 1.50 35 0.23 B 8#4@18 cm 9.135 2.89
8#4@19 cm 9.450 2.08
16. . MEMORIAL DE RESPONSABILIDAD

Villavicencio, Septiembre de 2017

SEÑORES:
CURADURIA URBANA DE VILLAVICENCIO
LA CIUDAD.

Yo, EDGAR JAVIER ARANGO RIVERAIngeniero Civil, M.P. 25202223070 CND,


debidamente registrado en el Consejo Ingeniería de Cundinamarca presento las
Memorias de Cálculo y Diseño Estructural, de acuerdo con la NORMA
COLOMBIANA DE DISEÑO Y CONSTRUCCIÓN SISMO RESISTENTE NSR-10,
para el proyecto DISEÑO ESTRUCTURAL CASETA DE CONTROL
SUBESTACION AMARILO EMSA; declarando que asumo la responsabilidad por
los Perjuicios que a causa ellos puedan deducirse, exonerando de cualquier
Responsabilidad a la Curaduría Urbana de Villavicencio.

Cordial Saludo

_______________________
EDGAR JAVIER ARANGO RIVERA
M.P. 25202223070 CND
17. DOCUMENTOS DEL DISEÑADOR
18. LICENCIA DC-CAD
Columna TIPO 1

Nv H e B H M1 M2 P Vc CUANTIA m/mr VPlast VPlast R.Viga R.Viga R.Col R.Col Col/Vig Col/Vig
Ppal Sec Ppal Sec Ppal Sec Ppal Sec
Nivel 1 5.80 47.00 12/#4 (1.1%) 0.89 49.08 72.16 73.23 113.86 1.49 1.58
3.25 .45 .45 .30 -56.50
103.11 11.18 16.33
2.00 5.90 71.50 12/#4 (1.1%) 0.89 72.16 72.16 102.71 73.23 1.01 1.42
VC001/
B=0.30 H=0.45 L=3.21 B=0.30 H=0.45 L=5.99 B=0.30 H=0.45 L=5.94 B=0.30 H=0.45 L=5.98 B=0.30 H=0.45 L=3.21
Mu=-3.90 Mu=-3.90 Mu=-13.80 Mu=-13.80 Mu=-11.50 Mu=-11.50 Mu=-13.70 Mu=-13.70 Mu=-3.90 Mu=-3.90
As =5.94 As =5.94As =5.94 As =5.94As =5.94 As =5.94As =5.94 As =5.94As =5.94 As =5.94
As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70
Mu=1.95 Mu=1.90 Mu=1.95 Mu=6.90 Mu=6.80 Mu=6.90 Mu=5.75 Mu=5.40 Mu=5.75 Mu=6.85 Mu=6.80 Mu=6.85 Mu=1.95 Mu=1.90 Mu=1.95
As =5.94 As =5.94 As =5.94As =5.94 As =5.94 As =5.94As =5.94 As =5.94 As =5.94As =5.94 As =5.94 As =5.94As =5.94 As =5.94 As =5.94
As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70 As(r)=3.70

Vu=5.40 Vu=5.40 Vu=11.80 Vu=11.80 Vu=10.10 Vu=10.10 Vu=11.80 Vu=11.80 Vu=5.40 Vu=5.40

VC002/
B=0.30 H=0.45 L=6.50
Mu=-16.90 Mu=-16.90
As =5.94 As =5.94
As(r)=3.70 As(r)=3.70
Mu=8.45 Mu=8.30 Mu=8.45
As =5.94 As =5.94 As =5.94
As(r)=3.70 As(r)=3.70 As(r)=3.70

Vu=13.30 Vu=13.30

DISEÑO DE VIGAS
V101/
B=0.30 H=0.45 L=3.21 B=0.30 H=0.45 L=5.99 B=0.30 H=0.45 L=5.94 B=0.30 H=0.45 L=5.98 B=0.30 H=0.45 L=3.21
Mu=-20.70 Mu=-38.10 Mu=-36.70 Mu=-45.30 Mu=-45.40 Mu=-45.40 Mu=-45.20 Mu=-36.60 Mu=-38.00 Mu=-20.70
As =5.94 As =5.94As =5.94 As =5.94As =5.94 As =5.94As =5.94 As =5.94As =5.94 As =5.94
As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05
Mu=19.40 Mu=9.52 Mu=19.05 Mu=21.80 Mu=21.80 Mu=22.65 Mu=22.70 Mu=18.20 Mu=22.70 Mu=22.60 Mu=21.70 Mu=21.70 Mu=19.00 Mu=9.50 Mu=19.40
As =5.94 As =5.94 As =5.94As =5.94 As =5.94 As =5.94As =5.94 As =5.94 As =5.94As =5.94 As =5.94 As =5.94As =5.94 As =5.94 As =5.94
As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05 As(r)=4.05

Vu=31.00 Vu=45.70 Vu=43.30 Vu=45.90 Vu=45.50 Vu=45.40 Vu=45.80 Vu=43.30 Vu=45.60 Vu=31.00

V102/
B=0.30 H=0.45 L=6.50
Mu=-56.00 Mu=-56.00
As =5.94 As =5.94
As(r)=4.05 As(r)=4.05
Mu=35.10 Mu=14.00 Mu=35.10
As =5.94 As =5.94 As =5.94
As(r)=4.05 As(r)=4.05 As(r)=4.05

Vu=29.70 Vu=29.70

DISEÑO DE VIGAS
LONG-TERM BEAM DEFLECTIONS
PERMISSIBLE DEFLECTIONS
Immediate deflection due to Live Load . . . . . = L/360
Long-term deflection due to Sustained loads . . = L/480

TYPE OF DEFLECTION LOAD COMBINATION


Immediate due to Dead load (DLs) D0 + DL
Immediate due to Live load (LLs)* LL
Immediate due to Sus. load (SLds) D0 + DL + .25LL
Long-term due to Sus. load (SLds) D0 + DL + .25LL
* Computed as Defl(DLS + LLs) - Defl(DLs)

Units: Defl: Max. deflection (cm), L: Beam length (m), h: Beam depth (cm)

IMMEDIATE DEFLECTIONS ADDITIONAL LONG-TERM DEFLEC. Sus.Lds


DLs Live Sut.Lds 6 months 1-year 5-years
Beam Floor h L L/h Beam Type Deflc Deflc Deflc Deflc Deflc Deflc
________ _____ ___ ____ ___ __________ _____ _____ _____ ______ ______ ______

A(1-2) 1 45 3.46 8 EndJContin 0.002 0.000 0.002 0.002 0.002 0.003


A(2-3) 1 45 6.29 14 BothEndCnt 0.022 0.000 0.022 0.022 0.026 0.037
A(3-5) 1 45 6.23 14 BothEndCnt 0.019 0.000 0.019 0.019 0.022 0.032
A(5-6) 1 45 6.28 14 BothEndCnt 0.022 0.000 0.022 0.022 0.026 0.037
A(6-7) 1 45 3.46 8 EndIContin 0.002 0.000 0.002 0.002 0.002 0.003
B(1-2) 1 45 3.46 8 EndJContin 0.002 0.000 0.002 0.002 0.002 0.003
B(2-3) 1 45 6.29 14 BothEndCnt 0.022 0.000 0.022 0.022 0.026 0.037
B(3-5) 1 45 6.23 14 BothEndCnt 0.019 0.000 0.019 0.019 0.022 0.032
B(5-6) 1 45 6.28 14 BothEndCnt 0.022 0.000 0.022 0.022 0.026 0.037
B(6-7) 1 45 3.46 8 EndIContin 0.002 0.000 0.002 0.002 0.002 0.003
A(1-2) 2 45 3.46 8 EndJContin 0.007 0.001 0.007 0.007 0.008 0.012
A(2-3) 2 45 6.29 14 BothEndCnt 0.078 0.016 0.082 0.085 0.099 0.141
A(3-5) 2 45 6.23 14 BothEndCnt 0.061 0.012 0.064 0.065 0.076 0.109
A(5-6) 2 45 6.28 14 BothEndCnt 0.078 0.016 0.082 0.084 0.098 0.140
A(6-7) 2 45 3.46 8 EndIContin 0.007 0.001 0.007 0.007 0.008 0.012
B(1-2) 2 45 3.46 8 EndJContin 0.007 0.001 0.007 0.007 0.008 0.012
B(2-3) 2 45 6.29 14 BothEndCnt 0.078 0.016 0.082 0.085 0.099 0.141
B(3-5) 2 45 6.23 14 BothEndCnt 0.061 0.012 0.064 0.065 0.076 0.109
B(5-6) 2 45 6.28 14 BothEndCnt 0.078 0.016 0.082 0.084 0.098 0.140
B(6-7) 2 45 3.46 8 EndIContin 0.007 0.001 0.007 0.007 0.008 0.012
1(A-B) 1 45 7.08 16 SimpSupprt 0.033 0.000 0.033 0.034 0.039 0.056
7(A-B) 1 45 7.08 16 SimpSupprt 0.033 0.000 0.033 0.034 0.039 0.056
1(A-B) 2 45 7.08 16 SimpSupprt 0.063 0.000 0.063 0.065 0.075 0.108
7(A-B) 2 45 7.08 16 SimpSupprt 0.063 0.000 0.063 0.065 0.075 0.108

NOTE: All beam deflections are smaller than maximum permissible deflection
Depth, H, of all beams is larger than that recomemenden in Table 9.5(a)

Immediate deflections are computed according to 9.5.2.3 with:


Effective stiffness: E I = Ec . Ie
Ie = (Mcr/Ma)³ Ig + [1 - (Mcr/Ma)³] Icr
Mcr = fr Ig/Yt
Icr = b(kd)³/3 + n As(d-kd)¹+(n-1)A's(kd-d')²
n = Es/Ec
Long-term deflections are computed according to 9.5.2.5