Está en la página 1de 43

CARMELO ALVIS SAS

NIT 800.190.413-4
INSTALACIONES HIDRAULICAS, SANITARIAS, GAS Y CONTRAINCENDIO

PROYECTO: MEDINA - DORAL


CONTRATISTA: CARMELO ALVIS SAS
ACTA DE OBRA No: 1
FECHA CORTE: 5-Aug-21

CUADRO DE PRECIOS Y CANTIDADES DE OBRA


CONTRATO ACTIVIDAD EJECTUTADA TOTAL ACTA 1 ACUMULADO
VALOR VALOR CANTIDAD VALOR CANT CANT VALOR
VIA 1 VIA 2 VIA 3 VIA 4 VIA 5 VIA 13
Capit. DESCRIPCIÓN UND. CANT. VIA 6
UNITARIO TOTAL MZA-MZB MZB'-MZC MZC'-MZD MZD'-MZF MZE MZM
TOTAL TOTAL ANTERIOR ACTUAL

1 REDES SUMINISTRO DE AGUA $ 376,251,343 35,602,419.79 0.00 $ -


1.1 Puntos 0.00 0.00 $ -
1,1,1 Punto Conexion de PEAD 110 mm UN 13 $ 170,740 $ 2,219,620 0.00 $ - 0.00 $ -
1,1,2 Punto Interfase de PEAD 110 mm a PEAD De ø32 UN 156 $ 100,027 $ 15,604,212
0.00 $ -
mm 0.00 $ -
1,1,3 Punto Interfase de PEAD 110 mm a PVC De ø4" UN 1 $ 220,667 $ 220,667
0.00 $ -
0.00 $ -
1,1,4 Punto Interfase de PEAD 110 mm a PVC De ø1" UN 2 $ 86,523 $ 173,046
0.00 $ -
0.00 $ -
1,1,5 Punto Interfase de PEAD 110 mm a PVC De ø3/4" UN 1 $ 84,426 $ 84,426
0.00 $ -
0.00 $ -
1,1,6 Puntos de Acometidas Domiciliaria De ø32 mm UN 156 $ 119,901 $ 18,704,556
0.00 $ -
Hasta medidor (Incluye tuberia) 0.00 $ -
1,1,7 Punto de Ventilacion Tanques De ø4" UN 2 $ 42,468 $ 84,936 0.00 $ - 0.00 $ -
1,1,8 Punto de Valvula Ventosa De ø2" UN 1 $ 99,638 $ 99,638 0.00 $ - 0.00 $ -
1.2 Acometida a Tanque Bajo $ - 0.00 0.00 $ -
1,2,1 Suministro e instalación tubería PE 100, PN 10, 110 ML 54 $ 38,470 $ 2,077,380
0.00 $ -
mm 0.00 $ -
1.3 Valvula de Compuerta $ - 0.00 0.00 $ -
1,3.1 Valv. Compuerta RW 4" UN 2 $ 1,079,797 $ 2,159,594 0.00 $ - 0.00 $ -
1.4 Válvulas de Flotador $ - 0.00 0.00 $ -
1,4,1 Val Flotador De ø4" Con piloto Autom. Un. 2 $ 3,247,455 $ 6,494,910 0.00 $ - 0.00 $ -
1,4,2 Camara de Inspeccion De 0,40 x 0,40 Un. 1 $ 301,703 $ 301,703 0.00 $ - 0.00 $ -
1.5 Conexiones a Tanques $ - 0.00 0.00 $ -
1,5,1 Pasamuro De ø4"× 0.60 m A. Inoxidable Un. 2 $ 1,401,639 $ 2,803,278 0.00 $ - 0.00 $ -
Ventilacion $ - 0.00 0.00 $ -
1.6 Conexiones a Tanques $ - 0.00 0.00 $ -
1,6,1 Pasamuro De ø4"× 0.60 m A. Inoxidable Un. 2 $ 1,401,639 $ 2,803,278 0.00 $ - 0.00 $ -
Succion Tanque Bajo Etapa No 2 $ - 0.00 0.00 $ -
1.7 Tubería PVC Presión $ - 0.00 0.00 $ -
1,7,1 Tuberia PVC De ø4" ML 14 $ 82,324 $ 1,152,536 0.00 $ - 0.00 $ -
1.8 Conexiones a Tanques $ - 0.00 0.00 $ -
1,8,1 Pasamuro De ø4"× 0.60 m A. Inoxidable Un. 4 $ 1,401,639 $ 5,606,556 0.00 $ - 0.00 $ -
1.9 Válvulas de Pie $ - 0.00 0.00 $ -
1,9,1 Val Pie De ø4" UN 4 $ 1,005,068 $ 4,020,272 0.00 $ - 0.00 $ -
Bypass $ - 0.00 0.00 $ -
Valvula de Dado $ - 0.00 0.00 $ -
Valv. Dado ø3" UN 1 $ 1,196,747 $ 1,196,747 0.00 $ - 0.00 $ -
Tuberia PVC De ø3" ML 4 $ 48,172 $ 192,688 0.00 $ - 0.00 $ -
Conexiones a Tanques $ - 0.00 0.00 $ -
Pasamuro De ø3"× 0.60 m A. Inoxidable Un. 2 $ 2,005,639 $ 4,011,278 0.00 $ - 0.00 $ -
Redes Impulsion Etapa No 2 $ - 0.00 0.00 $ -
1.1 Tubería PVC Presión $ - 0.00 0.00 $ -
1,10,1 Tuberia PVC De ø4" ML 12 $ 82,324 $ 987,888 0.00 $ - 0.00 $ -
1.11 Tubería PVC Presión RDE 9 - 21 - Retorno $ -
0.00 $ -
Retrolavado 0.00
1,11,1 Tuberia PVC -P De ø3/4" Ml. 3 $ 7,334 $ 22,002 0.00 $ - 0.00 $ -
1,11,2 Valvula Compuerta de drenaje De ø3/4" Un. 1 $ 69,294 $ 69,294 0.00 $ - 0.00 $ -
Valv. Compuerta RW 4" UN 1 $ 1,079,797 $ 1,079,797 0.00 $ - 0.00 $ -
Instalacion de Valvulas $ - 0.00 $ -
1.12 Valvulas de control $ - 0.00 $ -
1,12,1 Val Dado Flanchada De ø4" Un. 5 $ 1,477,345 $ 7,386,725 0.00 $ - 0.00 $ -
1,12,2 Camara de Inspeccion 0,90 x 0,90 m UN 5 $ 615,204 $ 3,076,020 0.00 $ - 0.00 $ -
1,12,3 Sum e Inst Hidrante Tipo Londres 110mm HD, UN 2 $ 3,361,529 $ 6,723,058
bridada, PN 10   0.00 $ -
0.00 $ -
Valvulas $ - 0.00 0.00 $ -
Valvula Ventosa De 2" Un. 1 $ 1,199,772 $ 1,199,772 0.00 $ - 0.00 $ -
Camara de Inspeccion Para Valvula de Ventosa UND 1 $ 1,775,547 $ 1,775,547
incluye el tabique 1,00 x 0,70 m 0.00 $ -
0.00 $ -
1.3 Redes Distribucion $ - 0.00 0.00 $ -
1.13,1 Suministro e instalación tubería PE 100, PN 10, 110 ML 2250 $ 42,600 $ 95,850,000 200 200 50
450.00 $ 19,170,000
mm 450.00 $ 19,170,000.0
1.14 Equipo de Bombeo Sistema de Suministro de Agua $ -
0.00 $ -
Potable ET 2
1,14,1 Suministro y conexión hidráulica Equipo de Bombeo UN 1 $ 65,748,893 $ 65,748,893
Velocidad Variable. Condiciones de operación: Q=
28,00 lps, H=44,0 mt. Consistente en 4 bombas,
incluye tableros y demás accesorios para el correcto 0.00 $ -
funcionamiento. No incluye cableado.

0.00 $ -
Otros $ - 0.00 0.00 $ -
1.15 Movimientos de Tierra Mayor Diametro Red de $ -
0.00 $ -
Distribucion 0.00
1,15,1 Localización y Replanteo redes   ML 2304 $ 5,329 $ 12,278,016 200 200 50 450.00 $ 2,398,050.0 450.00 $ 2,398,050
1,15,2 Prueba hidrostatica   UN 2 $ 2,508,751 $ 5,017,502 0.00 $ - 0.00 $ -
1,15,3 Cinta Señalización   ML 2304 $ 231 $ 532,224 0.00 $ - 0.00 $ -
1,15,4 Excavacion M3 1950 $ 16,381 $ 31,942,950 84.00 70.00 35.00 189.00 $ 3,096,009.0 189.00 $ 3,096,009
1,15,5 Relleno Arena ( Recebo arenoso)   M3 459 $ 67,730 $ 31,088,070 14.00 14.00 7.00 35.00 $ 2,370,550.0 35.00 $ 2,370,550
1,15,6 Relleno en Zahorra compactada M3 110 $ 56,050 $ 6,165,500 44.11 44.11 22.05 110.27 $ 6,180,810.8 110.27 $ 6,180,811
1,15,7 Relleno Material del Sitio M3 1449 $ 15,500 $ 22,459,500 70.00 56.00 28.00 154.00 $ 2,387,000.0 154.00 $ 2,387,000
1,15,8 Retiro de material sobrante de excavaciones   M3 0 $ 41,249 $ - 0.00 $ - 0.00 $ -
1.16 Movimientos de Tierra Menor Diametro Acometidas $ -
domiciliarias 0.00 $ -
0.00
1,16,1 Excavacion Ml. 593 $ 13,370 $ 7,928,410 0.00 $ - 0.00 $ -
1,16,2 Relleno material seleccionado Ml. $ 15,633 $ - 0.00 0.00 $ -
1,16,3 Relleno material sitio Ml. 593 $ 8,278 $ 4,908,854 0.00 $ - 0.00 $ -
1,16,4 Retiro Ml. 0 $ 4,386 $ - 0.00 $ - 0.00 $ -
2 REDES ALCANTARILLADO CONJUNTO 1 $ 493,090,290.14 110,806,342.56 0.00 $ -
2.1 Tubería Colectores Enterrados 0.00 $ -
2,1,1 De ø4" PVC-Sanitaria -Enterrada Ml. 114 $ 30,099 $ 3,431,286 0.00 $ - 0.00 $ -
De ø6" PVC-Sanitaria -Enterrada Ml. 404 $ 67,405 $ 27,231,620 0.00 $ - 0.00 $ -
2,1,2 De ø160 mm PVC-Pared Estructurada - Enterrada Ml. 624 $ 40,159 $ 25,059,216
128 128 128 48 64 496.00 $ 19,918,864
496.00 $ 19,918,864
2,1,3 De ø200 mm PVC-Pared Estructurada - Enterrada Ml. 1176 $ 53,351 $ 62,740,776
122 120 120 198 74 36 670.00 $ 35,745,170
670.00 $ 35,745,170
2.2 Camaras y Registros 0.00 0.00 $ -
2,2,1 Cámara de inspección H>1,60 y < 2,00 MTS Un. 1 $ 4,255,032 $ 4,255,032
0.00 $ -
cilíndricas en concreto 0.00 $ -
2,2,3 Cámara de inspección H>1,40 y < 1,60 MTS Un. 14 $ 3,895,519 $ 54,537,266
0.00 $ -
cilíndricas en concreto 0.00 $ -
2,2,4 Cámara de inspección H<1,40 MTS cilíndricas en Un. 5 $ 3,357,848 $ 16,789,240
concreto 0.00 $ -
0.00 $ -
2,2,5 Cámara de inspección H<1,00 MTS cilíndricas en Un. 16 $ 2,853,355 $ 45,653,680
concreto 0.00 $ -
0.00 $ -
2,2,6 Camara de Inspeccion 1,00 x 1,00 mt Un. 0 $ 699,174 $ - 0.00 $ - 0.00 $ -
2,2,7 Camara de Inspeccion 0,60 x 0,60 mt Un. 8 $ 333,895 $ 2,671,160 0.00 $ - 0.00 $ -
Camara de Inspeccion 0,80 x 0,80 mt Un. 88 $ 460,884 $ 40,557,792 0.00 $ - 0.00 $ -
2,2,8 Conexiones domiciliarias ø6" x ø4" Un. 0 $ 102,118 $ - 0.00 $ - 0.00 $ -
Conexiones domiciliarias ø6" x ø6" Un. 32 $ 116,969 $ 3,743,008 0.00 $ - 0.00 $ -
2,2,9 Conexiones domiciliarias ø8" x ø4" Un. $ 115,777 $ - 0.00 0.00 $ -
Conexiones domiciliarias ø8" x ø6" Un. 56 $ 133,969 $ 7,502,264 0.00 $ - 0.00 $ -
2,2,10 Conexiones domiciliarias a Manhol Un. 13 $ 40,800 $ 530,400 0.00 $ - 0.00 $ -
2.3 Movimientos de Tierra 0.00 $ -
2,3,1 Excavacion M3 2404.4 $ 31,581 $ 75,932,847 120.39 122.84 132.785 220.439 67.376 47.322 711.16 $ 22,458,997 711.16 $ 22,458,997
2,3,2 Relleno material seleccionado M3 278 $ 75,591 $ 21,014,298 55.27 59.51 59.51 58.233 36.560 8.949 278.03 $ 21,016,747 278.03 $ 21,016,747
2,3,3 Relleno de Arena M3 494.24 $ 67,670 $ 33,445,221 16.25 16.12 16.12 16.010 8.970 2.340 75.81 $ 5,130,029 75.81 $ 5,130,029
2,3,4 Relleno material sitio M3 1636.5 $ 17,400 $ 28,475,956 48.88 47.21 57.15 162.206 21.846 38.372 375.66 $ 6,536,535 375.66 $ 6,536,535
2,3,5 Retiro de material sobrante de excavaciones   M3 $ 37,579 $ - 0.00 0.00 $ -
2.4 Otros 0.00 0.00 $ -
2,4,1 Localización y Replanteo redes   ML 2318 $ 3,866 $ 8,961,388 0.00 $ - 0.00 $ -
2,4,2 Prueba de estanqueidad   ML 2318 $ 2,886 $ 6,689,748 0.00 $ - 0.00 $ -
2,4,3 Cinta Señalización   ML 2318 $ 231 $ 535,458 0.00 $ - 0.00 $ -
2.5 Estacion de Bombeo 0.00 0.00 $ -
2,5,1 Suministro y conexión hidráulica Equipo de Bombeo. UN 1 $ 11,451,708 $ 11,451,708
Condiciones de operación: Q= 8.70Lps,
Cabeza=10mt. Consistente en 2 bomba, incluye
arrancador, suiches de nivel y demás accesorios 0.00 $ -
para el correcto funcionamiento. No incluye
cableado.
0.00 $ -
2,5,2 Tuberia Presion De ø3" ML 92 $ 46,597 $ 4,286,924 0.00 $ - 0.00 $ -
2.6 Válvulas de Compuerta 0.00 0.00 $ -
2,6,1 De ø3" UN 2 $ 669,429 $ 1,338,858 0.00 $ -
2.7 Válvulas de Cheque 0.00
2,7.1 De ø3" UN 2 $ 719,825 $ 1,439,650 0.00 $ -
2,7,2 Camara de Inspeccion 1,50 x 1,50 mt UN 1 $ 4,815,494 $ 4,815,494 0.00 $ -
SUBTOTAL 869,341,633 $ 146,408,762 $ 146,408,762

VALOR TOTAS COSTOS DIRECTOS 869,341,633 146,408,762.34 $ 146,408,762

COSTOS INDIRECTOS TOTAL COSTOS $ 146,408,762


TOTAL COSTOS DIRECTOS 869,341,633 DIRECTOS $ 146,408,762
ADMINISTRACION 9.00% 78,240,747 9.00% $ 13,176,789 $ 13,176,789
IMPREVISTOS 1.00% 8,693,416 1.00% $ 1,464,088 $ 1,464,088
UTILIDAD 2.00% 17,386,833 2.00% $ 2,928,175 $ 2,928,175
TOTAL AIU 12.00% 104,320,996 12.00% $ 17,569,051 $ 17,569,051
IVA SOBRE LA UTILIDAD 19.00% 3,303,498 19.00% $ 556,353 $ 556,353
VALOR TOTAL PRESUPUESTO 976,966,127 VALOR TOTAL $ 164,534,167 $ 164,534,167

CONTRATISTA CONTRATANTE

Ingeniero residente Arquitecto residente

Director de obra Director de obra

Gerente Gerente
VÍA 1 (MZA A - MZA B)
MZA A ENTRE MH-35 Y MH-36
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH-36 14.66 14.14 13.88 13.98 0.78
60 14.68 14.16 13.9 14 0.78
50 14.76 14.21 13.95 14.05 0.81
40 14.9 14.26 14 14.1 0.9
30 14.87 14.31 14.05 14.15 0.82
20 15.01 14.36 14.1 14.2 0.91
10 15.14 14.41 14.15 14.25 0.99
MH-35 15.14 14.46 14.2 14.3 0.94

MZA A ENTRE MH-36 Y MH-38


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH-38 13.99 13.65 13.39 13.49 0.6
60 14.17 13.67 13.41 13.51 0.76
50 14.27 13.74 13.48 13.58 0.79
40 14.26 13.81 13.55 13.65 0.71
30 14.4 13.88 13.62 13.72 0.78
20 14.53 13.95 13.69 13.79 0.84
10 14.63 14.02 13.76 13.86 0.87
MH-36 14.64 14.09 13.83 13.93 0.81

MZA B ENTRE MH-39 Y MH-40


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH-40 14.4 14.13 13.87 13.97 0.53
60 14.48 14.15 13.89 13.99 0.59
50 14.62 14.2 13.94 14.04 0.68
40 14.62 14.25 13.99 14.09 0.63
30 14.72 14.3 14.04 14.14 0.68
20 14.82 14.35 14.09 14.19 0.73
10 14.82 14.4 14.14 14.24 0.68
MH-39 14.86 14.45 14.19 14.29 0.67

MZA B ENTRE MH-40 Y MH-41


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH-41 13.8 13.46 13.2 13.30 0.6
60 13.85 13.48 13.22 13.32 0.63
50 13.95 13.58 13.32 13.42 0.63
40 14.05 13.68 13.42 13.52 0.63
30 14.15 13.78 13.52 13.62 0.63
20 14.25 13.88 13.62 13.72 0.63
10 14.35 13.98 13.72 13.82 0.63
MH-40 14.4 14.08 13.82 13.92 0.58

VÍA 2 (MZA B` - MZA C)


MZA B` ENTRE MH-42 Y MH-43
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH-43 14.200 13.84 13.58 13.680 0.62
60 14.145 13.87 13.61 13.71 0.535
50 14.202 13.93 13.67 13.77 0.532
40 14.232 13.99 13.73 13.83 0.502
30 14.342 14.05 13.79 13.89 0.552
20 14.434 14.11 13.85 13.95 0.584
10 14.597 14.17 13.91 14.01 0.687
MH-42 14.632 14.23 13.97 14.07 0.662

MZA B` ENTRE MH-43 Y MH-44


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N

MH-44 13.58 13.1 12.8 12.9 0.78


60 13.60 13.11 12.81 12.91 0.79
50 13.84 13.23 12.93 13.03 0.912
40 13.92 13.35 13.05 13.15 0.87
30 14.02 13.47 13.17 13.27 0.85
20 14.04 13.59 13.29 13.39 0.75
10 14.18 13.71 13.41 13.51 0.77
MH-43 14.20 13.83 13.53 13.63 0.67

MZA C ENTRE MH-45 Y MH-46


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH-46 13.985 13.78 13.52 13.62 0.465
60 14.045 13.81 13.55 13.65 0.495
50 14.085 13.88 13.62 13.72 0.465
40 14.200 13.95 13.69 13.79 0.51
30 14.230 14.02 13.76 13.86 0.47
20 14.345 14.09 13.83 13.93 0.515
10 14.385 14.16 13.9 14 0.485
MH-45 14.385 14.23 13.97 14.07 0.415

MZA C ENTRE MH-46 Y MH-47


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH-47 13.65 13.03 12.73 12.83 0.915
60 13.65 13.05 12.75 12.85 0.895
50 13.71 13.17 12.87 12.97 0.84
40 13.80 13.29 12.99 13.09 0.805
30 13.82 13.41 13.11 13.21 0.705
20 13.87 13.53 13.23 13.33 0.635
10 13.90 13.65 13.35 13.45 0.545
MH-46 13.90 13.77 13.47 13.57 0.425

VIA No. 3 (MZA C´ - MZA D)


MZA C` ENTRE MH-49 Y MH-50
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH-50 13.76 13.42 13.16 13.26 0.6
60 13.765 13.44 13.18 13.28 0.585
50 13.835 13.49 13.23 13.33 0.605
40 13.865 13.54 13.28 13.38 0.585
30 13.935 13.59 13.33 13.43 0.605
20 13.965 13.64 13.38 13.48 0.585
10 14.025 13.69 13.43 13.53 0.595
MH-49 14.075 13.74 13.48 13.58 0.595

MZA C` ENTRE MH-50 Y MH-51


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA EXCAVACIÓ
TERRENO
N

MH-51 13.215 12.71 12.45 12.55 0.765


50 13.265 12.82 12.56 12.66 0.705
40 13.41 12.93 12.67 12.77 0.74
30 13.505 13.04 12.78 12.88 0.725
20 13.615 13.15 12.89 12.99 0.725
10 13.645 13.26 13 13.1 0.645
MH-50 13.76 13.37 13.11 13.21 0.65

MZA D ENTRE MH-52 Y MH-53


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA EXCAVACIÓ
TERRENO
N
MH-53 13.87 13.42 13.16 13.26 0.71
60 13.94 13.44 13.18 13.28 0.76
50 14.055 13.49 13.23 13.33 0.825
40 14.225 13.54 13.28 13.38 0.945
30 14.245 13.59 13.33 13.43 0.915
20 14.23 13.64 13.38 13.48 0.85
10 14.255 13.69 13.43 13.53 0.825
MH-52 14.285 13.74 13.48 13.58 0.805

MZA D ENTRE MH-53 Y MH-54


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N

MH-54 13.385 12.83 12.57 12.67 0.815


50 13.585 12.92 12.66 12.76 0.925
40 13.655 13.01 12.75 12.85 0.905
30 13.705 13.1 12.84 12.94 0.865
20 13.835 13.19 12.93 13.03 0.905
10 13.885 13.28 13.02 13.12 0.865
MH-53 13.87 13.37 13.11 13.21 0.76

VIA No. 4 (MZA D´ - MZA F)


MZA D' ENTRE MH-58 Y MH-59
PROFUNDID
ABS COTA COTA CLAVE COTA EXC COTA BATEA AD DE
TERRENO EXCAVACIÓ
N
MH-59 13.64 12.67 12.41 12.51 1.23
70 13.72 12.71 12.45 12.55 1.27
60 13.85 12.76 12.5 12.6 1.35
50 13.94 12.81 12.55 12.65 1.39
40 14.02 12.86 12.6 12.7 1.42
30 14.1 12.91 12.65 12.75 1.45
20 14.18 12.96 12.7 12.8 1.48
10 14.24 13.01 12.75 12.85 1.49
MH-58 14.28 13.06 12.8 12.9 1.48

MZA D' ENTRE MH-59 Y MH-60


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA EXCAVACIÓ
TERRENO
N

MH-60 13.28 12.37 12.11 12.21 1.17


50 13.37 12.42 12.16 12.26 1.21
40 13.43 12.47 12.21 12.31 1.22
30 13.48 12.52 12.26 12.36 1.22
20 13.53 12.57 12.31 12.41 1.22
10 13.64 12.62 12.36 12.46 1.28
MH-59 13.72 12.67 12.41 12.51 1.31
MZA F ENTRE MH-61 Y MH-62
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH-62 13.660 13.05 12.79 12.89 0.87
40 13.780 13.14 12.88 12.98 0.9
30 13.860 13.19 12.93 13.03 0.93
20 13.910 13.24 12.98 13.08 0.93
10 13.900 13.29 13.03 13.13 0.87
MH-61 13.890 13.34 13.08 13.18 0.81

MZA D' ENTRE MH-62 Y MH-63


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N

MH-63 13.05 12.4 12.14 12.24 0.91


50 13.2 12.5 12.24 12.34 0.96
40 13.39 12.6 12.34 12.44 1.05
30 13.47 12.7 12.44 12.54 1.03
20 13.49 12.8 12.54 12.64 0.95
10 13.5 12.9 12.64 12.74 0.86
MH-62 13.6 13 12.74 12.84 0.86

VIA No. 5 (MZA E)


MZA E ENTRE MH-55 Y MH-56
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH-56 14.516 14.24 13.98 14.08 0.536
60 14.55 14.26 14 14.1 0.55
50 14.576 14.31 14.05 14.15 0.526
40 14.631 14.36 14.1 14.2 0.531
30 14.716 14.41 14.15 14.25 0.566
20 14.866 14.46 14.2 14.3 0.666
10 15.076 14.51 14.25 14.35 0.826
MH-55 15.296 14.56 14.3 14.4 0.996

MZA E ENTRE MH-56 Y MH-57


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N

MH-57 13.921 13.67 13.41 13.51 0.511


70 14.041 13.7 13.44 13.54 0.601
60 14.131 13.77 13.51 13.61 0.621
50 14.281 13.84 13.58 13.68 0.701
40 14.381 13.91 13.65 13.75 0.731
30 14.42 13.98 13.72 13.82 0.7
20 14.431 14.05 13.79 13.89 0.641
10 14.461 14.12 13.86 13.96 0.601
MH-56 14.516 14.19 13.93 14.03 0.586

VIA No. 6 (ZONA SOCIAL)


MZA B ENTRE MH-41 Y MH-44
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N

MH-44 13.82 12.77 12.51 12.61 1.31


30 14.3 12.8 12.54 12.64 1.76
20 14.3 12.85 12.59 12.69 1.71
10 14.48 12.9 12.64 12.74 1.84
MH-41 14.2 12.95 12.69 12.79 1.51

TUBERÍA DE ACUEDUCTO
VÍA 1 (MZA A - MZA B)
ITEM DESCRIPCION MZA A MZA B MZA B'

TUBERIA DE 110 mm 100 100 100


EXCAVACION 49.00 35.00 35.00
RELLENO ARENA 7.00 7.00 7.00
RELLENO MATERIAL SELECCIONADO 20.05 20.05 20.05
RELLENO MAT. DEL SITIO 28.95 14.95 14.95
A - MZA B)
VOLUMEN VOLUMEN
AREA DE LA TUBERIA A RELLENO
EXC PROM EXCAVACIÓ MATERIAL
SECCION DESCONTAR ARENA
N SELECCIONADO

0.78 0.507 2.028 13.69 1.29 4.16


0.795 0.517 5.1675 MATERIAL DEL SITIO
0.855 0.556 5.5575 22.724
0.86 0.559 5.59 VOLUMEN TOTAL TRAMO
0.865 0.562 5.6225 36.413
0.95 0.618 6.175
0.965 0.627 6.2725 TUBO 160mm 64 MTS
AREA TUBO 0.020

VOLUMEN
AREA DE LA TUBERIA A RELLENO
EXC PROM EXCAVACIÓ VOLUMEN ARENA
SECCION DESCONTAR ARENA
N

0.68 0.442 0.884 14.17 1.95 4.03


0.775 0.504 5.0375 MATERIAL DEL SITIO
0.75 0.488 4.875 17.749
0.745 0.484 4.8425 VOLUMEN TOTAL TRAMO
0.81 0.527 5.265 31.922
0.855 0.556 5.5575
0.84 0.546 5.46 TUBO 200 mm 62 MTS
AREA TUBO 0.031

VOLUMEN VOLUMEN
AREA DE LA TUBERIA A RELLENO
EXC PROM EXCAVACIÓ MATERIAL
SECCION DESCONTAR ARENA
N SELECCIONADO

0.56 0.364 1.456 13.69 1.29 4.16


0.635 0.413 4.1275 MATERIAL DEL SITIO
0.655 0.426 4.2575 13.962
0.655 0.426 4.2575 VOLUMEN TOTAL TRAMO
0.705 0.458 4.5825 27.651
0.705 0.458 4.5825
0.675 0.439 4.3875 TUBO 160mm 64 MTS
AREA TUBO 0.020

VOLUMEN VOLUMEN
AREA DE LA TUBERIA A RELLENO
EXC PROM EXCAVACIÓ MATERIAL
SECCION DESCONTAR ARENA
N SELECCIONADO

0.615 0.400 13.72 1.88 3.90


0.63 0.409 4.095 MATERIAL DEL SITIO
0.63 0.409 4.095 10.692
0.63 0.410 4.095 VOLUMEN TOTAL TRAMO
0.63 0.410 4.095 24.408
0.63 0.410 4.095
0.605 0.393 3.9325 TUBO 200 mm 60
AREA TUBO 0.031

` - MZA C)
VOLUMEN VOLUMEN
EXC PROM AREA DE LA EXCAVACIÓ
TUBERIA A RELLENO
MATERIAL
SECCION DESCONTAR ARENA
N SELECCIONADO

0.5775 0.448 1.79025 14.84 1.29 4.16


0.5335 0.413 4.134625 MATERIAL DEL SITIO
0.517 0.401 4.00675 13.729
0.527 0.408 4.08425 VOLUMEN TOTAL TRAMO
0.568 0.440 4.402 28.570
0.6355 0.493 4.925125
0.6745 0.523 5.227375 TUBO 160mm 64 MTS
AREA TUBO 0.020

AREA DE LA VOLUMEN
VOLUMEN
TUBERIA A RELLENO
EXC PROM EXCAVACIÓ MATERIAL
SECCION N SELECCIONADO DESCONTAR ARENA

0.785 0.608 14.92 1.88 3.90


0.851 0.660 6.59525 MATERIAL DEL SITIO
0.891 0.691 6.90525 22.920
0.86 0.666 6.665 VOLUMEN TOTAL TRAMO
0.8 0.620 6.2 37.835
0.76 0.589 5.89
0.72 0.558 5.58 TUBO DE 200 mm 60
AREA TUBO 0.031

VOLUMEN VOLUMEN
AREA DE LA TUBERIA A RELLENO
EXC PROM EXCAVACIÓ MATERIAL
SECCION DESCONTAR ARENA
N SELECCIONADO

0.48 0.372 1.488 14.84 1.29 4.16


0.48 0.372 3.72 MATERIAL DEL SITIO
0.4875 0.378 3.778125 9.122
0.49 0.380 3.7975 VOLUMEN TOTAL TRAMO
0.4925 0.382 3.816875 23.963
0.5 0.388 3.875
0.45 0.349 3.4875 TUBO 160mm 64 MTS
AREA TUBO 0.020

VOLUMEN VOLUMEN
EXC PROM AREA DE LA EXCAVACIÓ
TUBERIA A RELLENO
MATERIAL
SECCION N SELECCIONADO DESCONTAR ARENA

0.905 0.701 14.92 1.88 3.90


0.8675 0.672 6.723125 MATERIAL DEL SITIO
0.8225 0.637 6.374375 17.557
0.755 0.585 5.85125 VOLUMEN TOTAL TRAMO
0.67 0.519 5.1925 32.472
0.59 0.457 4.5725
0.485 0.376 3.75875 TUBO DE 200 mm 60 MTS
AREA TUBO 0.031

MZA D)
VOLUMEN VOLUMEN
AREA DE LA TUBERIA A RELLENO
EXC PROM EXCAVACIÓ MATERIAL
SECCION N SELECCIONADO DESCONTAR ARENA

0.5925 0.459 1.83675 14.84 1.29 4.16


0.595 0.461 4.61125 MATERIAL DEL SITIO
0.595 0.461 4.61125 14.624
0.595 0.461 4.61125 VOLUMEN TOTAL TRAMO
0.595 0.461 4.61125 29.466
0.59 0.457 4.5725
0.595 0.461 4.61125 TUBO 160mm 64 MTS
AREA TUBO 0.020

VOLUMEN VOLUMEN
AREA DE LA TUBERIA A RELLENO
EXC PROM EXCAVACIÓ MATERIAL
SECCION DESCONTAR ARENA
N SELECCIONADO

0.735 0.570 14.92 1.88 3.90


0.7225 0.560 5.599375 MATERIAL DEL SITIO
0.7325 0.568 5.676875 12.307
0.725 0.562 5.61875 VOLUMEN TOTAL TRAMO
0.685 0.531 5.30875 27.222
0.6475 0.502 5.018125
TUBO DE 200 mm 60 MTS
AREA TUBO 0.031

VOLUMEN VOLUMEN
AREA DE LA TUBERIA A RELLENO
EXC PROM EXCAVACIÓ MATERIAL
SECCION DESCONTAR ARENA
N SELECCIONADO

0.735 0.570 2.2785 14.84 1.29 4.16


0.7925 0.614 6.141875 MATERIAL DEL SITIO
0.885 0.686 6.85875 27.292
0.93 0.721 7.2075 VOLUMEN TOTAL TRAMO
0.8825 0.684 6.839375 42.133
0.8375 0.649 6.490625
0.815 0.632 6.31625 TUBO 160mm 64 MTS
AREA TUBO 0.020
VOLUMEN VOLUMEN
AREA DE LA TUBERIA A RELLENO
EXC PROM EXCAVACIÓ MATERIAL
SECCION N SELECCIONADO DESCONTAR ARENA

0.87 0.674 14.92 1.88 3.90


0.915 0.709 7.09125 MATERIAL DEL SITIO
0.885 0.686 6.85875 19.049
0.885 0.686 6.85875 VOLUMEN TOTAL TRAMO
0.885 0.686 6.85875 33.964
0.8125 0.630 6.296875
TUBO DE 200 mm 60 MTS
AREA TUBO 0.031

MZA F)

VOLUMEN VOLUMEN
EXC PROM AREA DE LA EXCAVACIÓ MATERIAL TUBERIA A RELLENO
SECCION DESCONTAR ARENA
N SELECCIONADO

1.29 1.000 8.30 17.27 2.46 5.09


1.31 1.015 10.15 MATERIAL DEL SITIO
1.37 1.062 10.62 68.177
1.405 1.089 10.89 VOLUMEN TOTAL TRAMO
1.435 1.112 11.12 85.449
1.465 1.135 11.35
1.485 1.151 11.51 TUBO 200mm 78.3 MTS
1.485 1.151 11.51 AREA TUBO 0.031

AREA DE LA VOLUMEN
VOLUMEN
TUBERIA A RELLENO
EXC PROM
SECCION EXCAVACIÓ
MATERIAL
DESCONTAR ARENA
N SELECCIONADO

1.19 0.922 9.22 14.92 1.88 3.90


1.215 0.942 9.42 MATERIAL DEL SITIO
1.22 0.946 9.46 42.357
1.22 0.946 9.46 VOLUMEN TOTAL TRAMO
1.25 0.969 9.69 57.273
1.295 1.004 10.04 MTS
TUBO DE 200 mm 60
AREA TUBO 0.031

VOLUMEN VOLUMEN
AREA DE LA TUBERIA A RELLENO
EXC PROM EXCAVACIÓ MATERIAL
SECCION DESCONTAR ARENA
N SELECCIONADO

0.885 0.686 5.49 11.13 0.97 3.12


0.915 0.709 7.09 MATERIAL DEL SITIO
0.93 0.721 7.21 22.140
0.9 0.698 6.98 VOLUMEN TOTAL TRAMO
0.84 0.651 6.51 33.271

TUBO 160mm 48 MTS


AREA TUBO 0.020

AREA DE LA VOLUMEN
VOLUMEN
TUBERIA A RELLENO
EXC PROM EXCAVACIÓ MATERIAL
SECCION N SELECCIONADO DESCONTAR ARENA

0.935 0.725 7.25 14.92 1.88 3.90


1.005 0.779 7.79 MATERIAL DEL SITIO
1.04 0.806 8.06 29.531
0.99 0.767 7.67 VOLUMEN TOTAL TRAMO
0.905 0.701 7.01 44.446
0.86 0.667 6.67 MTS
TUBO DE 200 mm 60
AREA TUBO 0.031

E)

VOLUMEN VOLUMEN
EXC PROM AREA DE LA EXCAVACIÓ
TUBERIA A RELLENO
MATERIAL
SECCION DESCONTAR ARENA
N SELECCIONADO

0.543 0.421 1.6833 14.84 1.29 4.16


0.538 0.417 4.1695 MATERIAL DEL SITIO
0.5285 0.410 4.095875 16.974
0.5485 0.425 4.250875 VOLUMEN TOTAL TRAMO
0.616 0.477 4.774 31.815
0.746 0.578 5.7815
0.911 0.706 7.06025 TUBO 160mm 64 MTS
AREA TUBO 0.020

VOLUMEN VOLUMEN
AREA DE LA TUBERIA A RELLENO
EXC PROM EXCAVACIÓ MATERIAL
SECCION DESCONTAR ARENA
N SELECCIONADO

0.606 0.470 18.40 2.32 4.81


0.611 0.474 4.73525 MATERIAL DEL SITIO
0.661 0.512 5.12275 17.166
0.716 0.555 5.549 VOLUMEN TOTAL TRAMO
0.7155 0.555 5.545125 35.561
0.6705 0.520 5.196375
0.621 0.481 4.81275 TUBO DE 200 mm 74 MTS
0.5935 0.460 4.599625 AREA TUBO 0.031

CIAL)

VOLUMEN VOLUMEN
EXC PROM AREA DE LA EXCAVACIÓ
TUBERIA A RELLENO
MATERIAL
SECCION DESCONTAR ARENA
N SELECCIONADO

1.535 1.190 7.14 8.95 1.13 2.34


1.735 1.345 13.45 MATERIAL DEL SITIO
1.775 1.376 13.76 38.372
1.675 1.298 12.98 VOLUMEN TOTAL TRAMO
47.322

TUBO DE 200 mm 36 MTS


AREA TUBO 0.031

CTO
A B)
TUBERIA A
MZA C MZA C
DESCONTAR
100 100 0.95
35.00 35.00
7.00 7.00
20.05 20.05
14.95 14.95
CARMELO ALVIS SAS
NIT 800.190.413-4
INSTALACIONES HIDRAULICAS, SANITARIAS, GAS Y CONTRAINCENDIO

PROYECTO: MEDINA - DORAL


CONTRATISTA: CARMELO ALVIS SAS
ACTA DE OBRA No: 2
FECHA CORTE: 2-Sep-21

CUADRO DE PRECIOS Y CANTIDADES DE OBRA


CONTRATO ACTIVIDAD EJECTUTADA TOTAL ACTA 2 ACUMULADO P0R EJECUTAR
VALOR VALOR VIA 1 VIA 2 VIA 3 VIA 4 VIA 5 VIA 13 CANTIDAD VALOR CANT CANT VALOR CANT VALOR
Capit. DESCRIPCIÓN UND. CANT. VIA 6
UNITARIO TOTAL MZA-MZB MZB'-MZC MZC'-MZD MZD'-MZF MZE MZM TOTAL TOTAL ANTERIOR ACTUAL ACTUAL

1 REDES ACUEDUCTO EXTERNAS CONJUNTO 1 $ 376,251,343 84,742,761.35 0.00 $ - $ 169,608,755,521


1.1 Puntos
1,1,1 Punto Conexion de PEAD 110 mm UN 13 $ 170,740 $ 2,219,620 0.00 $ - 0.00 0.00 $ - 13.00 $ 28,855,060
1,1,2 Punto Interfase de PEAD 110 mm a PEAD De ø32 UN 156 $ 100,027 $ 15,604,212 20
mm 20.00 $ 2,000,540 136.00 $ 2,122,172,832
20.00 $ 2,000,540.0 0.00
1,1,3 Punto Interfase de PEAD 110 mm a PVC De ø4" UN 1 $ 220,667 $ 220,667
0.00 $ - 1.00 $ 220,667
0.00 $ - 0.00
1,1,4 Punto Interfase de PEAD 110 mm a PVC De ø1" UN 2 $ 86,523 $ 173,046
0.00 $ - 2.00 $ 346,092
0.00 $ - 0.00
1,1,5 Punto Interfase de PEAD 110 mm a PVC De ø3/4" UN 1 $ 84,426 $ 84,426
0.00 $ - 1.00 $ 84,426
0.00 $ - 0.00
1,1,6 Puntos de Acometidas Domiciliaria De ø32 mm UN 156 $ 119,901 $ 18,704,556 20
Hasta medidor (Incluye tuberia) 20.00 $ 2,398,020 136.00 $ 2,543,819,616
20.00 $ 2,398,020.0 0.00
1,1,7 Punto de Ventilacion Tanques De ø4" UN 2 $ 42,468 $ 84,936 0.00 $ - 0.00 0.00 $ - $ -
1,1,8 Punto de Valvula Ventosa De ø2" UN 1 $ 99,638 $ 99,638 0.00 $ - 0.00 0.00 $ - 1.00 $ 99,638
1.2 Acometida a Tanque Bajo
1,2,1 Suministro e instalación tubería PE 100, PN 10, 110 ML 54 $ 38,470 $ 2,077,380
0.00 $ - 54.00 $ 112,178,520
mm 0.00 $ - 0.00
1.3 Valvula de Compuerta
1,3.1 Valv. Compuerta RW 4" UN 2 $ 1,079,797 $ 2,159,594 0.00 $ - 0.00 0.00 $ - 2.00 $ 4,319,188
1.4 Válvulas de Flotador
1,4,1 Val Flotador De ø4" Con piloto Autom. Un. 2 $ 3,247,455 $ 6,494,910 0.00 $ - 0.00 0.00 $ -
1,4,2 Camara de Inspeccion De 0,40 x 0,40 Un. 1 $ 301,703 $ 301,703 0.00 $ - 0.00 0.00 $ - 1.00 $ 301,703
1.5 Conexiones a Tanques
1,5,1 Pasamuro De ø4"× 0.60 m A. Inoxidable Un. 2 $ 1,401,639 $ 2,803,278 0.00 $ - 0.00 0.00 $ -
Ventilacion
1.6 Conexiones a Tanques
1,6,1 Pasamuro De ø4"× 0.60 m A. Inoxidable Un. 2 $ 1,401,639 $ 2,803,278 0.00 $ - 0.00 0.00 $ -
Succion Tanque Bajo Etapa No 2
1.7 Tubería PVC Presión
1,7,1 Tuberia PVC De ø4" ML 14 $ 82,324 $ 1,152,536 0.00 $ - 0.00 0.00 $ - 14.00 $ 16,135,504
1.8 Conexiones a Tanques
1,8,1 Pasamuro De ø4"× 0.60 m A. Inoxidable Un. 4 $ 1,401,639 $ 5,606,556 0.00 $ - 0.00 0.00 $ - 4.00 $ 22,426,224
1.9 Válvulas de Pie
1,9,1 Val Pie De ø4" UN 4 $ 1,005,068 $ 4,020,272 0.00 $ - 0.00 0.00 $ -
Bypass
Valvula de Dado
Valv. Dado ø3" UN 1 $ 1,196,747 $ 1,196,747 0.00 $ - 0.00 0.00 $ - 1.00 $ 1,196,747
Tuberia PVC De ø3" ML 4 $ 48,172 $ 192,688 0.00 $ - 0.00 0.00 $ - 4.00 $ 770,752
Conexiones a Tanques
Pasamuro De ø3"× 0.60 m A. Inoxidable Un. 2 $ 2,005,639 $ 4,011,278 0.00 $ - 0.00 0.00 $ -
Redes Impulsion Etapa No 2
1.1 Tubería PVC Presión
1,10,1 Tuberia PVC De ø4" ML 12 $ 82,324 $ 987,888 0.00 $ - 0.00 0.00 $ - 12.00 $ 11,854,656
1.11 Tubería PVC Presión RDE 9 - 21 - Retorno
Retrolavado
1,11,1 Tuberia PVC -P De ø3/4" Ml. 3 $ 7,334 $ 22,002 0.00 $ - 0.00 0.00 $ - 3.00 $ 66,006
1,11,2 Valvula Compuerta de drenaje De ø3/4" Un. 1 $ 69,294 $ 69,294 0.00 $ - 0.00 0.00 $ -
Valv. Compuerta RW 4" UN 1 $ 1,079,797 $ 1,079,797 0.00 $ - 0.00 0.00 $ - 1.00 $ 1,079,797
Instalacion de Valvulas
1.12 Valvulas de control
1,12,1 Val Dado Flanchada De ø4" Un. 5 $ 1,477,345 $ 7,386,725 0.00 $ - 0.00 0.00 $ - 5.00 $ 36,933,625
1,12,2 Camara de Inspeccion 0,90 x 0,90 m UN 5 $ 615,204 $ 3,076,020 0.00 $ - 0.00 0.00 $ - 5.00 $ 15,380,100
1,12,3 Sum e Inst Hidrante Tipo Londres 110mm HD, UN 2 $ 3,361,529 $ 6,723,058
bridada, PN 10   0.00 $ - 2.00 $ 13,446,116
0.00 $ - 0.00
Valvulas $ - 0.00 0.00 0.00 $ - 0.00 $ -
Valvula Ventosa De 2" Un. 1 $ 1,199,772 $ 1,199,772 0.00 $ - 0.00 0.00 $ - 1.00 $ 1,199,772
Camara de Inspeccion Para Valvula de Ventosa UND 1 $ 1,775,547 $ 1,775,547
0.00 $ - 1.00 $ 1,775,547
incluye el tabique 1,00 x 0,70 m 0.00 $ - 0.00
1.3 Redes Distribucion $ - 0.00 0.00 0.00 $ - 0.00 $ -
1.13,1 Suministro e instalación tubería PE 100, PN 10, 110 ML 2250 $ 42,600 $ 95,850,000 55 60 210 242.5
mm 1500.00 $ 63,900,000 750.00 $ 71,887,500,000
270.5 212 1050.00 $ 44,730,000.0 450.00
1.14 Equipo de Bombeo Sistema de Suministro de Agua $ -
0.00 $ -
Potable ET 2 0.00 0.00
1,14,1 Suministro y conexión hidráulica Equipo de Bombeo UN 1 $ 65,748,893 $ 65,748,893
Velocidad Variable. Condiciones de operación: Q=
28,00 lps, H=44,0 mt. Consistente en 4 bombas,
incluye tableros y demás accesorios para el correcto 0.00 $ - 1.00 $ 65,748,893
funcionamiento. No incluye cableado.

0.00 $ - 0.00
Otros 0.00
1.15 Movimientos de Tierra Mayor Diametro Red de
Distribucion 0.00
1,15,1 Localización y Replanteo redes   ML 2304 $ 5,329 $ 12,278,016 55 60 210 242.5 270.5 212 1050.00 $ 5,595,450.0 450.00 1500.00 $ 7,993,500 804.00 $ 9,871,524,864
1,15,2 Prueba hidrostatica   UN 2 $ 2,508,751 $ 5,017,502 0.00 $ - 0.00 0.00 $ - 2.00 $ 10,035,004
1,15,3 Cinta Señalización   ML 2304 $ 231 $ 532,224 0.00 $ - 0.00 0.00 $ - 2304.00 $ 1,226,244,096
1,15,4 Excavacion M3 1950 $ 16,381 $ 31,942,950 26.95 21 73.5 84.875 94.675 74.2 375.20 $ 6,146,151.2 189.00 564.20 $ 9,242,160 1385.80 $ 44,266,540,110
1,15,5 Relleno Arena ( Recebo arenoso)   M3 459 $ 67,730 $ 31,088,070 16.3650479 17.85277956 62.4847285 72.1549841 80.48628 63.0798211 312.42 $ 21,160,453.3 35.00 347.42 $ 23,531,003 111.58 $ 3,468,693,619
1,15,6 Relleno en Zahorra compactada M3 110 $ 56,050 $ 6,165,500 0.00 $ - 110.27 110.27 $ 6,180,811 -0.27 $ (1,684,186)
1,15,7 Relleno Material del Sitio M3 1449 $ 15,500 $ 22,459,500 12.0726837 4.7702004 16.6957014 19.27956 21.50565 16.8547081 91.18 $ 1,413,266.9 154.00 245.18 $ 3,800,267 1203.82 $ 27,037,228,822
1,15,8 Retiro de material sobrante de excavaciones   M3 0 $ 41,249 $ - 0.00 $ - 0.00 0.00 $ - 0.00 $ -
1.16 Movimientos de Tierra Menor Diametro Acometidas
domiciliarias 0.00
1,16,1 Excavacion Ml. 593 $ 13,370 $ 7,928,410 60 60.00 $ 802,200.0 0.00 60.00 $ 802,200 533.00 $ 4,225,842,530
1,16,2 Relleno material seleccionado Ml. $ 15,633 $ - 0.00 0.00 0.00 $ - 0.00 $ -
1,16,3 Relleno material sitio Ml. 593 $ 8,278 $ 4,908,854 60 60.00 $ 496,680.0 0.00 60.00 $ 496,680 533.00 $ 2,616,419,182
1,16,4 Retiro Ml. 0 $ 4,386 $ - 0.00 $ - 0.00 0.00 $ - 0.00 $ -
2 REDES ALCANTARILLADO CONJUNTO 1 $ 493,090,290.14 58,558,672.67 0.00 0.00 $ - $ 177,181,159,099
2.1 Tubería Colectores Enterrados 0.00
2,1,1 De ø4" PVC-Sanitaria -Enterrada Ml. 114 $ 30,099 $ 3,431,286 0.00 $ - 0.00 0.00 $ - 114.00 $ 391,166,604
De ø6" PVC-Sanitaria -Enterrada Ml. 404 $ 67,405 $ 27,231,620 0.00 $ - 0.00 0.00 $ - 404.00 $ 11,001,574,480
2,1,2 De ø160 mm PVC-Pared Estructurada - Enterrada Ml. 624 $ 40,159 $ 25,059,216
496.00 $ 19,918,864 128.00 $ 3,207,579,648
0.00 $ - 496.00
2,1,3 De ø200 mm PVC-Pared Estructurada - Enterrada Ml. 1176 $ 53,351 $ 62,740,776
30 193 187 1080.00 $ 57,619,080 96.00 $ 6,023,114,496
410.00 $ 21,873,910 670.00
2.2 Camaras y Registros 0.00
2,2,1 Cámara de inspección H>1,60 y < 2,00 MTS Un. 1 $ 4,255,032 $ 4,255,032
cilíndricas en concreto 0.00 $ - 1.00 $ 4,255,032
0.00 $ - 0.00
2,2,3 Cámara de inspección H>1,40 y < 1,60 MTS Un. 14 $ 3,895,519 $ 54,537,266
cilíndricas en concreto 0.00 $ - 14.00 $ 763,521,724
0.00 $ - 0.00
2,2,4 Cámara de inspección H<1,40 MTS cilíndricas en Un. 5 $ 3,357,848 $ 16,789,240
0.00 $ - 5.00 $ 83,946,200
concreto 0.00 $ - 0.00
2,2,5 Cámara de inspección H<1,00 MTS cilíndricas en Un. 16 $ 2,853,355 $ 45,653,680
0.00 $ - 16.00 $ 730,458,880
concreto 0.00 $ - 0.00
2,2,6 Camara de Inspeccion 1,00 x 1,00 mt Un. 0 $ 699,174 $ - 0.00 $ - 0.00 0.00 $ - 0.00 $ -
2,2,7 Camara de Inspeccion 0,60 x 0,60 mt Un. 8 $ 333,895 $ 2,671,160 0.00 $ - 0.00 0.00 $ - 8.00 $ 21,369,280
Camara de Inspeccion 0,80 x 0,80 mt Un. 88 $ 460,884 $ 40,557,792 0.00 $ - 0.00 0.00 $ - 88.00 $ 3,569,085,696
2,2,8 Conexiones domiciliarias ø6" x ø4" Un. 0 $ 102,118 $ - 0.00 $ - 0.00 0.00 $ - 0.00 $ -
Conexiones domiciliarias ø6" x ø6" Un. 32 $ 116,969 $ 3,743,008 0.00 $ - 0.00 0.00 $ - 32.00 $ 119,776,256
2,2,9 Conexiones domiciliarias ø8" x ø4" Un. $ 115,777 $ - 0.00 0.00 0.00 $ - 0.00 $ -
Conexiones domiciliarias ø8" x ø6" Un. 56 $ 133,969 $ 7,502,264 0.00 $ - 0.00 0.00 $ - 56.00 $ 420,126,784
2,2,10 Conexiones domiciliarias a Manhol Un. 13 $ 40,800 $ 530,400 0.00 $ - 0.00 0.00 $ - 13.00 $ 6,895,200
2.3 Movimientos de Tierra 0.00
2,3,1 Excavacion M3 2404.4 $ 31,581 $ 75,932,847 16.504 219.254 247.298 483.06 $ 15,255,427 711.16 1194.21 $ 37,714,424 1210.17 $ 91,891,761,286
2,3,2 Relleno material seleccionado M3 278 $ 75,591 $ 21,014,298 0.00 $ - 278.03 278.03 $ 21,016,747 -0.03 $ (680,902)
2,3,3 Relleno de Arena M3 494.24 $ 67,670 $ 33,445,221 9.424 61.800 62.452 133.68 $ 9,045,832 75.81 209.49 $ 14,175,861 284.75 $ 9,523,688,353
2,3,4 Relleno material sitio M3 1636.5 $ 17,400 $ 28,475,956 7.937 163.073 190.524 361.53 $ 6,290,688 375.66 737.20 $ 12,827,223 899.35 $ 25,609,921,451
2,3,5 Retiro de material sobrante de excavaciones   M3 $ 37,579 $ - 0.00 0.00 0.00 $ - 0.00 $ -
2.4 Otros 0.00
2,4,1 Localización y Replanteo redes   ML 2318 $ 3,866 $ 8,961,388 250 248 248 246 168 229 187 1576.00 $ 6,092,816 0.00 1576.00 $ 6,092,816 742.00 $ 6,649,349,896
2,4,2 Prueba de estanqueidad   ML 2318 $ 2,886 $ 6,689,748 0.00 $ - 0.00 0.00 $ - 2318.00 $ 15,506,835,864
2,4,3 Cinta Señalización   ML 2318 $ 231 $ 535,458 0.00 $ - 0.00 0.00 $ - 2318.00 $ 1,241,191,644
2.5 Estacion de Bombeo 0.00
2,5,1 Suministro y conexión hidráulica Equipo de Bombeo. UN 1 $ 11,451,708 $ 11,451,708
Condiciones de operación: Q= 8.70Lps,
Cabeza=10mt. Consistente en 2 bomba, incluye
arrancador, suiches de nivel y demás accesorios 0.00 $ - 1.00 $ 11,451,708
para el correcto funcionamiento. No incluye
cableado.
0.00 $ - 0.00
2,5,2 Tuberia Presion De ø3" ML 92 $ 46,597 $ 4,286,924 0.00 $ - 0.00 0.00 $ - 92.00 $ 394,397,008
2.6 Válvulas de Compuerta 0.00
2,6,1 De ø3" UN 2 $ 669,429 $ 1,338,858 0.00 $ - 0.00 0.00 $ - 2.00 $ 2,677,716
2.7 Válvulas de Cheque 0.00
2,7.1 De ø3" UN 2 $ 719,825 $ 1,439,650 0.00 $ - 0.00 0.00 $ - 2.00 $ 2,879,300
2,7,2 Camara de Inspeccion 1,50 x 1,50 mt UN 1 $ 4,815,494 $ 4,815,494 0.00 $ - 0.00 0.00 $ - 1.00 $ 4,815,494
SUBTOTAL CAP REDES ALCANTARILLADO CONJUNTO 1 869,341,633 $ 143,301,434 $ 289,710,196 177,181,159,099

VALOR TOTAS COSTOS DIRECTOS 869,341,633 143,301,434.02 $ 289,710,196 346,789,914,620

COSTOS INDIRECTOS TOTAL COSTOS $ 143,301,434


TOTAL COSTOS DIRECTOS 869,341,633 DIRECTOS $ 289,710,196 $ 346,789,914,620
ADMINISTRACION 9.00% 78,240,747 9.00% $ 12,897,129 $ 26,073,918 $ 31,211,092,316
IMPREVISTOS 1.00% 8,693,416 1.00% $ 1,433,014 $ 2,897,102 $ 312,110,923
UTILIDAD 2.00% 17,386,833 2.00% $ 2,866,029 $ 5,794,204 $ 6,242,218
TOTAL AIU 12.00% 104,320,996 12.00% $ 17,196,172 $ 34,765,224 31,529,445,457
IVA SOBRE LA UTILIDAD 19.00% 3,303,498 19.00% $ 544,545 $ 1,100,899 $ 5,990,594,637
VALOR TOTAL PRESUPUESTO 976,966,127 VALOR TOTAL $ 161,042,152 $ 325,576,319 $ 384,309,954,715

DEDUCCIONES
ABONO A LA UNIDAD DE VIVIENDA ($334.000.000) 35.00% 50,155,502
AMORTIZACION DE ANTICIPO ($ 165.780.357) 20.00% 28,660,287
RETEGARANTIA DE OBRA 10.00% 14,330,143
TOTAL DEDEUCCIONES 65.00% 93,145,932
TOTAL DESPUES DE DEDUCCIONES 67,896,219

CONTRATISTA

ING. ANDRES PEREZ BARRIOS ING. ANDREA DUARTE OSORIO ING. CRISTIAN ALVIS YEPES
Ingeniero residente Director de obra Gerente

CONTRATANTE

JADER ACOSTA MEJIA ING. RICARDO UPARELA ACOSTA ING. ALBERTO CEPEDA FACIOLINCE
Topografo residente Director de obra Gerente
TUBERÍA DE ACUEDUCTO
VÍA 1 (MZA A - MZA B)
ITEM DESCRIPCION VIA 1 VIA 2 VIA 3
TUBERIA DE 110 mm 55 60 210
EXCAVACION 26.95 21.00 73.50
RELLENO ARENA 14.88 16.23 56.80
RELLENO MAT. DEL SITIO 12.07 4.77 16.70

VIA No. 6 (ZONA SOCIAL)


ENTRE VIA 6 Y VIA 1 ENTRE MH-38 Y MH-41
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N

MH-47 13.72 12.95 12.69 12.79 1.03


6 13.79 13.01 12.75 12.85 1.04
3 13.88 13.085 12.825 12.925 1.055
MH-44 13.98 13.16 12.9 13 1.08

ENTRE VIA 6 Y VIA 2 ENTRE MH-44 Y MH-47


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N

MH-47 13.72 12.52 12.26 12.36 1.46


6 13.72 12.53 12.27 12.37 1.45
3 13.86 12.555 12.295 12.395 1.565
MH-44 13.82 12.58 12.32 12.42 1.5
MZA C ENTRE MH-47 Y MH-51

PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH-51 13.6 12.355 12.095 12.20 1.505
30 13.6 12.37 12.11 12.21 1.49
20 13.77 12.42 12.16 12.26 1.61
10 13.86 12.47 12.21 12.31 1.65
MH-47 13.72 12.52 12.26 12.36 1.46

ENTRE VIA 6 Y VIA 3 ENTRE MH-51 Y MH-54


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N

MH-54 13.4 12.22 11.96 12.06 1.44


10 13.45 12.23 11.97 12.07 1.48
5 13.4 12.255 11.995 12.095 1.405
MH-51 13.6 12.355 12.095 12.12 1.505

MZA D ENTRE MH-54 Y MH-60

PROFUNDID
COTA AD DE
ABS TERRENO COTA CLAVE COTA EXC COTA BATEA EXCAVACIÓ
N
MH-60 13.2 12.055 11.795 11.90 1.405
30 13.2 12.07 11.81 11.91 1.39
20 13.39 12.12 11.86 11.96 1.53
10 13.5 12.17 11.91 12.01 1.59
MH-54 13.4 12.22 11.96 12.06 1.44

ENTRE VIA 6 Y VIA 4 ENTRE MH-60 Y MH-63


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N

MH-63 13.25 12.22 11.96 12.06 1.29


10 13.25 12.005 11.745 11.845 1.505
5 13.19 12.03 11.77 11.87 1.42
MH-60 13.2 12.055 11.795 11.90 1.405

MZA D' ENTRE MH-63 Y MH-65


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH-65 12.4 11.37 11.11 11.21 1.29
80 12.48 11.42 11.16 11.26 1.32
70 12.55 11.47 11.21 11.31 1.34
60 12.54 11.52 11.26 11.36 1.28
50 12.61 11.57 11.31 11.41 1.3
40 12.66 11.62 11.36 11.46 1.3
30 12.68 11.67 11.41 11.51 1.27
20 12.79 11.72 11.46 11.56 1.33
10 12.72 11.77 11.51 11.61 1.21
MH-63 12.85 11.82 11.56 11.66 1.29

VIA No. 13 (MZA M)


MZA M ENTRE MH-65 Y MH-67
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH-67 11.65 10.42 10.16 10.26 1.49
110 11.57 10.47 10.21 10.31 1.36
100 11.71 10.52 10.26 10.36 1.45
90 11.84 10.57 10.31 10.41 1.53
80 11.99 10.62 10.36 10.46 1.63
70 12.01 10.67 10.41 10.51 1.6
60 12.2 10.72 10.46 10.56 1.74
50 12.24 10.77 10.51 10.61 1.73
40 12.21 10.82 10.56 10.66 1.65
30 12.2 10.87 10.61 10.71 1.59
20 12.24 10.92 10.66 10.76 1.58
10 12.2 10.97 10.71 10.81 1.49
MH-65 12.13 11.02 10.76 10.86 1.37

MZA M ENTRE MH-67 Y MH-68


PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA EXCAVACIÓ
TERRENO
N

80 11.3 10.02 9.76 9.86 1.54


70 11.34 10.07 9.81 9.91 1.53
60 11.3 10.12 9.86 9.96 1.44
50 11.43 10.17 9.91 10.01 1.52
40 11.54 10.22 9.96 10.06 1.58
30 11.6 10.27 10.01 10.11 1.59
20 11.68 10.32 10.06 10.16 1.62
10 11.79 10.37 10.11 10.21 1.68
MH-67 11.9 10.42 10.16 10.26 1.74

VIA No. 5 (MZA E) LOCALES


MZA M ENTRE MH-58" Y MH-58
PROFUNDID
COTA AD DE
ABS TERRENO COTA CLAVE COTA EXC COTA BATEA EXCAVACIÓ
N
MH- 58" 13.7 13.26 13 13.1 0.7
20 13.7 13.3 13.04 13.14 0.66
10 13.8 13.35 13.09 13.19 0.71
MH-67 14 13.4 13.14 13.24 0.86
CTO
A B)
VIA 4 VIA 5 VIA 6
242.5 270.5 212
84.88 94.68 74.20
65.60 73.17 57.35
19.28 21.51 16.85

CIAL)
-41

VOLUMEN
EXC PROM AREA DE LA EXCAVACIÓ
TUBERIA A RELLENO
SECCION N DESCONTAR ARENA

1.035 0.802 1.60 0.25 2.51


1.0475 0.812 2.44 MATERIAL DEL SITIO
1.0675 0.827 2.48 4.013
VOLUMEN TOTAL TRAMO
6.522

TUBO DE 200 8 MTS


AREA TUBO 0.031

-47

AREA DE LA VOLUMEN TUBERIA A RELLENO


EXC PROM EXCAVACIÓ
SECCION DESCONTAR ARENA
N

1.455 1.128 2.26 0.25 2.51


1.5075 1.168 3.50 MATERIAL DEL SITIO
1.5325 1.188 3.56 6.815
VOLUMEN TOTAL TRAMO
9.323

TUBO DE 200 8 MTS


AREA TUBO 0.031
TUBERIA A RELLENO
DESCONTAR ARENA

VOLUMEN
AREA DE LA
EXC PROM EXCAVACIÓ
SECCION
N
1.04 9.42
1.4975 1.161 9.63 MATERIAL DEL SITIO
1.55 1.201 12.01 36.905
1.63 1.263 12.63 VOLUMEN TOTAL TRAMO
1.555 1.205 12.05 46.329
0.73 0.566 0.57
TUBO 200mm 33 MTS
AREA TUBO 0.031

-54

VOLUMEN
EXC PROM AREA DE LA EXCAVACIÓ
TUBERIA A RELLENO
SECCION N DESCONTAR ARENA

1.46 1.132 1.13 0.35 3.45


1.4425 1.118 5.59 MATERIAL DEL SITIO
1.455 1.128 5.64 8.910
1.4975 1.161 9.63 VOLUMEN TOTAL TRAMO
12.359

TUBO DE 200 11 MTS


AREA TUBO 0.031

TUBERIA A RELLENO
DESCONTAR ARENA

AREA DE LA VOLUMEN
EXC PROM SECCION EXCAVACIÓ
N
1.04 9.42
1.3975 1.083 8.99 MATERIAL DEL SITIO
1.46 1.132 11.32 34.711
1.56 1.209 12.09 VOLUMEN TOTAL TRAMO
1.515 1.174 11.74 44.136
1.46 1.132 1.13
TUBO 200mm 33 MTS
AREA TUBO 0.031
-63
VOLUMEN
AREA DE LA TUBERIA A RELLENO
EXC PROM EXCAVACIÓ
SECCION N DESCONTAR ARENA

1.3975 1.083 1.08 0.35 3.45


1.4625 1.133 5.67 MATERIAL DEL SITIO
1.4125 1.095 5.47 8.774
1.3975 1.083 8.99 VOLUMEN TOTAL TRAMO
12.224

TUBO DE 200 11 MTS


AREA TUBO 0.031

VOLUMEN
EXC PROM AREA DE LA EXCAVACIÓ
TUBERIA A RELLENO
SECCION N DESCONTAR ARENA

1.285 0.996 8.27 2.80 25.42


1.33 1.031 10.31 MATERIAL DEL SITIO
1.31 1.015 10.15 62.945
1.29 1.000 10.00 VOLUMEN TOTAL TRAMO
1.3 1.008 10.08 88.362
1.285 0.996 9.96
1.3 1.008 10.08 TUBO 200mm 89 MTS
1.27 0.984 9.84 AREA TUBO 0.031
1.25 0.969 9.69

M)

VOLUMEN
EXC PROM AREA DE LA EXCAVACIÓ
TUBERIA A RELLENO
SECCION DESCONTAR ARENA
N

1.615 1.252 10.39 3.73 33.93


1.405 1.089 10.89 MATERIAL DEL SITIO
1.49 1.155 11.55 110.962
1.58 1.225 12.25 VOLUMEN TOTAL TRAMO
1.615 1.252 12.52 144.890
1.67 1.294 12.94
1.735 1.345 13.45 TUBO 200mm 118.8 MTS
1.69 1.310 13.10 AREA TUBO 0.031
1.62 1.256 12.56
1.585 1.228 12.28
1.535 1.190 11.90
1.43 1.108 11.08

AREA DE LA VOLUMEN TUBERIA A RELLENO


EXC PROM
SECCION EXCAVACIÓ DESCONTAR ARENA
N

1.535 1.190 16.65 2.51 22.85


1.485 1.151 11.51 MATERIAL DEL SITIO
1.48 1.147 11.47 79.562
1.55 1.201 12.01 VOLUMEN TOTAL TRAMO
1.585 1.228 12.28 102.409
1.605 1.244 12.44
1.65 1.279 12.79 TUBO 200mm 80 MTS
1.71 1.325 13.25 AREA TUBO 0.031

CALES

AREA DE LA VOLUMEN TUBERIA A RELLENO


EXC PROM SECCION EXCAVACIÓ DESCONTAR ARENA
N

0.68 0.527 5.11 0.94 8.57


0.685 0.531 5.31 MATERIAL DEL SITIO
0.785 0.608 6.08 7.937
VOLUMEN TOTAL TRAMO
16.504

TUBO 200mm 30 MTS


AREA TUBO 0.031
CARMELO ALVIS SAS
NIT 800.190.413-4
INSTALACIONES HIDRAULICAS, SANITARIAS, GAS Y CONTRAINCENDIO

PROYECTO: MEDINA - DORAL


CONTRATISTA: CARMELO ALVIS SAS
ACTA DE OBRA No: 3
FECHA CORTE: 8-Oct-21

CUADRO DE PRECIOS Y CANTIDADES DE OBRA


CONTRATO ACTIVIDAD EJECTUTADA TOTAL ACTA 3 ACUMULADO P0R EJECUTAR
VALOR VALOR CANTIDAD VALOR CANT CANT VALOR CANT VALOR
VIA 6
VIA 1 VIA 2 VIA 3 VIA 4 VIA 5 VIA 13
Capit. DESCRIPCIÓN UND. CANT. ZONA
UNITARIO TOTAL MZA-MZB MZB'-MZC MZC'-MZD MZD'-MZF MZE MZM
SOCIAL
TOTAL TOTAL ANTERIOR ACTUAL ACTUAL

1 REDES ACUEDUCTO EXTERNAS CONJUNTO 1 $ 376,251,343.00 42,701,635.51 $ 215,253,406


1.1 Puntos
1,1,1 Punto Conexion de PEAD 110 mm UN 13 $ 170,740 $ 2,219,620 12 12.00 $ 2,048,880.0 0.00 12.00 $ 2,048,880 1.00 $ 2,219,620
1.3 Redes Distribucion 0.00
1.13,1 Suministro e instalación tubería PE 100, PN 10, 110 ML 2250 $ 42,600 $ 95,850,000
57.6 47.6 47.6 23.8 327.28 2003.88 $ 85,365,288 246.12 $ 10,484,712
mm 503.88 $ 21,465,288.0 1500.00
1.14 Equipo de Bombeo Sistema de Suministro de Agua
0.00
Potable ET 2 0.00
Otros 0.00 0.00
1.15 Movimientos de Tierra Mayor Diametro Red de
Distribucion 0.00
0.00
1,15,1 Localización y Replanteo redes   ML 2304 $ 5,329 $ 12,278,016 57.6 47.6 47.6 23.8 327.28 503.88 $ 2,685,176.5 1500.00 2003.88 $ 10,678,677 300.12 $ 1,599,339
1,15,4 Excavacion M3 1950 $ 16,381 $ 31,942,950 24.19 19.99 19.99 10.00 193.53 267.70 $ 4,385,187.1 564.20 831.90 $ 13,627,347 1118.10 $ 18,315,603
1,15,5 Relleno Arena ( Recebo arenoso)   M3 459 $ 67,730 $ 31,088,070 17.14 14.16 14.16 7.08 97.38 149.93 $ 10,154,599.2 347.42 497.35 $ 33,685,603 -38.35 $ (2,597,533)
1,15,7 Relleno Material del Sitio M3 1449 $ 15,500 $ 22,459,500 8.06 6.66 6.66 3.33 101.89 126.61 $ 1,962,504.6 245.18 371.79 $ 5,762,771 1077.21 $ 16,696,729
1.16 Movimientos de Tierra Menor Diametro Acometidas
domiciliarias 0.00
2 REDES ALCANTARILLADO CONJUNTO 1 $ 493,090,290.14 29,877,862.02 0.00 0.00 $ - $ 293,847,413
2.1 Tubería Colectores Enterrados 0.00
De ø6" PVC-Sanitaria -Enterrada Ml. 404 $ 67,405 $ 27,231,620 17 10.2 27.20 $ 1,833,416 0.00 27.20 $ 1,833,416 376.80 $ 25,398,204
2,1,2 De ø160 mm PVC-Pared Estructurada - Enterrada Ml. 624 $ 40,159 $ 25,059,216
32 20 20 10 10 16.5 604.50 $ 24,276,116 19.50 $ 783,101
108.50 $ 4,357,252 496.00
2,1,3 De ø200 mm PVC-Pared Estructurada - Enterrada Ml. 1176 $ 53,351 $ 62,740,776
10 29 1119.00 $ 59,699,769 57.00 $ 3,041,007
39.00 $ 2,080,689 1080.00
2.2 Camaras y Registros 0.00
2,2,5 Cámara de inspección H<1,00 MTS cilíndricas en Un. 16 $ 2,853,355 $ 45,653,680
1.4 1.4 1.4 4.20 $ 11,984,091 11.80 $ 33,669,589
concreto 4.20 $ 11,984,091 0.00
Conexiones domiciliarias ø6" x ø6" Un. 32 $ 116,969 $ 3,743,008 8 4 12.00 $ 1,403,628 0.00 12.00 $ 1,403,628 20.00 $ 2,339,380
Conexiones domiciliarias ø8" x ø6" Un. 56 $ 133,969 $ 7,502,264 2 2 4.00 $ 535,876 0.00 4.00 $ 535,876 52.00 $ 6,966,388
2.3 Movimientos de Tierra 0.00
2,3,1 Excavacion M3 2404.4 $ 31,581 $ 75,932,847 24.13 20.22 23.9 10.418 9.862 6.930 24.360 119.83 $ 3,784,288 1194.21 1314.04 $ 41,498,712 1090.34 $ 34,434,135
2,3,3 Relleno de Arena M3 494.24 $ 67,670 $ 33,445,221 6.53 6.41 5.94 2.969 3.141 4.620 8.120 37.73 $ 2,552,997 209.49 247.21 $ 16,728,858 247.03 $ 16,716,363
2,3,4 Relleno material sitio M3 1636.5 $ 17,400 $ 28,475,956 1.19 1.39 8.97 7.449 7.006 2.310 16.240 44.56 $ 775,391 737.20 781.76 $ 13,602,614 854.79 $ 14,873,342
2.4 Otros 0.00
2,4,1 Localización y Replanteo redes   ML 2318 $ 3,866 $ 8,961,388 32 20 20 10 20 16.5 29 147.50 $ 570,235 1576.00 1723.50 $ 6,663,051 594.50 $ 2,298,337
2.5 Estacion de Bombeo 0.00
2.6 Válvulas de Compuerta 0.00
2.7 Válvulas de Cheque 0.00
SUBTOTAL CAP REDES CONJUNTO 1 869,341,633 $ 72,579,498 $ 362,289,694 293,847,413

VALOR TOTAS COSTOS DIRECTOS 869,341,633 72,579,497.53 $ 362,289,694 509,100,819

COSTOS INDIRECTOS TOTAL COSTOS $ 72,579,498


TOTAL COSTOS DIRECTOS 869,341,633 DIRECTOS $ 362,289,694 $ 509,100,819
ADMINISTRACION 9.00% 78,240,747 9.00% $ 6,532,155 $ 32,606,072 $ 45,819,074
IMPREVISTOS 1.00% 8,693,416 1.00% $ 725,795 $ 3,622,897 $ 5,091,008
UTILIDAD 2.00% 17,386,833 2.00% $ 1,451,590 $ 7,245,794 $ 10,182,016
TOTAL AIU 12.00% 104,320,996 12.00% $ 8,709,540 $ 43,474,763 61,092,098
IVA SOBRE LA UTILIDAD 19.00% 3,303,498 19.00% $ 275,802 $ 1,376,701 $ 1,934,583
VALOR TOTAL PRESUPUESTO 976,966,127 VALOR TOTAL $ 81,564,839 $ 407,141,158 $ 572,127,501

DEDUCCIONES
ABONO A LA UNIDAD DE VIVIENDA ($334.000.000) 35.00% 25,402,824
AMORTIZACION DE ANTICIPO ($ 165.780.357) 20.00% 14,515,900
RETEGARANTIA DE OBRA 10.00% 7,257,950
TOTAL DEDEUCCIONES 65.00% 47,176,673
TOTAL DESPUES DE DEDUCCIONES 34,388,166

CONTRATISTA

ING. ANDRES PEREZ BARRIOS ING. ANDREA DUARTE OSORIO ING. CRISTIAN ALVIS YEPES
Ingeniero residente Director de obra Gerente

CONTRATANTE

JADER ACOSTA MEJIA ING. RICARDO UPARELA ACOSTA ING. ALBERTO CEPEDA FACIOLINCE
Topografo residente Director de obra Gerente
TUBERÍA DE ACUEDUCTO
VÍA 1 (MZA A - MZA B)
ITEM DESCRIPCION VIA 1 VIA 2 VIA 3
TUBERIA DE 110 mm 57.6 47.6 47.6
EXCAVACION 24.19 19.99 19.99
RELLENO ARENA 15.58 12.88 12.88
RELLENO MAT. DEL SITIO 8.06 6.66 6.66

VIA No. 1 (MZA A - MZB)


MZA A ARRANQUE
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
10 14.7 14.45 14.19 14.29 0.51
6 14.6 14.47 14.21 14.31 0.39
3 14.6 14.485 14.225 14.325 0.375
MH- 35 14.8 14.5 14.24 14.34 0.56

MZA A MH-38-PORTERIA
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA EXCAVACIÓ
TERRENO
N
12 13.6 13.37 13.11 13.21 0.49
6 13.65 13.39 13.13 13.23 0.52
3 13.72 13.405 13.145 13.245 0.575
MH- 38 13.7 13.42 13.16 13.26 0.54

MZA B ARRANQUE
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
10 14.7 14.44 14.18 14.28 0.52
6 14.65 14.46 14.2 14.3 0.45
3 14.7 14.475 14.215 14.315 0.485
MH- 39 14.75 14.49 14.23 14.33 0.52

VIA No. 2 (MZA B' - MZA C)


MZB' M ARRANQUE
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH- 42 14.39 14.284 14.024 14.124 0.366
3 14.4 14.266 14.006 14.106 0.394
6 14.5 14.248 13.988 14.088 0.512
10 14.48 14.23 13.97 14.07 0.51

MZA C ARRANQUE
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA EXCAVACIÓ
TERRENO
N
MH- 45 14.4 14.293 14.033 14.133 0.367
3 14.45 14.272 14.012 14.112 0.438
6 14.53 14.251 13.991 14.091 0.539
10 14.56 14.23 13.97 14.07 0.59
VIA No. 3 (MZA C' - MZA D)
MZC' M ARRANQUE
PROFUNDID
COTA AD DE
ABS TERRENO COTA CLAVE COTA EXC COTA BATEA EXCAVACIÓ
N
MH-49 14.39 13.79 13.53 13.63 0.86
3 14.4 13.775 13.515 13.615 0.885
6 14.5 13.76 13.5 13.6 1
10 14.48 13.74 13.48 13.58 1

MZA D ARRANQUE
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH-52 14.4 13.785 13.525 13.625 0.875
3 14.45 13.77 13.51 13.61 0.94
6 14.53 13.755 13.495 13.595 1.035
10 14.5 13.74 13.48 13.58 1.02

VIA No. 4 (MZA D' - MZA F)


MZF M ARRANQUE
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH- 42 14.39 13.394 13.134 13.234 1.256
3 14.4 13.376 13.116 13.216 1.284
6 14.5 13.358 13.098 13.198 1.402
10 14.48 13.34 13.08 13.18 1.4

VIA No. 5 (MZA E)


MZA E ENTRE MH-57 Y MH-58
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH- 57 14.1 13.06 12.8 12.9 1.3
6 14.05 13.08 12.82 12.92 1.23
3 14.1 13.095 12.835 12.935 1.265
MH 57 14.2 13.11 12.85 12.95 1.35

MZA E ARRANQUE
PROFUNDID
COTA AD DE
ABS COTA CLAVE COTA EXC COTA BATEA
TERRENO EXCAVACIÓ
N
MH- 55 14.73 14.614 14.354 14.454 0.376
3 14.75 14.596 14.336 14.436 0.414
6 14.78 14.578 14.318 14.418 0.462
10 14.8 14.56 14.3 14.4 0.5
EXCAVACION DE MANHOLES
N° PROF ANCHO LONG VOLUMEN
MH-36 1 1.8 2.5 4.5
MH-40 1 1.8 2.5 4.5
MH-43 1 1.8 2.5 4.5
MH-46 1 1.8 2.5 4.5
MH-50 1 1.8 2.5 4.5
MH-53 1 1.8 2.5 4.5
VOL T 27
CTO
A B)
VIA 4 VIA 6
23.8 327.28
10.00 193.53
6.44 88.53
3.33 101.89

MZB)

VOLUMEN VOLUMEN
EXC PROM AREA DE LA EXCAVACIÓ
MATERIAL TUBERIA A RELLENO
SECCION SELECCIONA DESCONTAR ARENA
N
DO

0.45 0.349 1.40 2.32 0.20 0.65


0.3825 0.296 0.89 MATERIAL DEL SITIO
0.4675 0.362 1.09 0.402
VOLUMEN TOTAL TRAMO
3.371

TUBO 160mm 10 MTS


AREA TUBO 0.020

VOLUMEN
VOLUMEN
AREA DE LA MATERIAL TUBERIA A RELLENO
EXC PROM SECCION EXCAVACIÓ
SELECCIONA DESCONTAR ARENA
N
DO

0.505 0.391 2.35 2.78 0.24 0.78


0.5475 0.424 1.27 MATERIAL DEL SITIO
0.5575 0.432 1.30 1.355
VOLUMEN TOTAL TRAMO
4.917

TUBO 160mm 12 MTS


AREA TUBO 0.020
VOLUMEN
VOLUMEN
AREA DE LA MATERIAL TUBERIA A RELLENO
EXC PROM EXCAVACIÓ
SECCION N SELECCIONA DESCONTAR ARENA
DO

0.485 0.376 1.50 2.32 0.20 0.65


0.4675 0.362 1.09 MATERIAL DEL SITIO
0.5025 0.389 1.17 0.790
VOLUMEN TOTAL TRAMO
3.759

TUBO 160mm 10 MTS


AREA TUBO 0.020

MZA C)

VOLUMEN
VOLUMEN
EXC PROM AREA DE LA EXCAVACIÓ
MATERIAL TUBERIA A RELLENO
SECCION SELECCIONA DESCONTAR ARENA
N DO

0.38 0.294 0.88 2.32 0.20 0.65


0.453 0.351 1.05 MATERIAL DEL SITIO
0.511 0.396 1.58 0.552
VOLUMEN TOTAL TRAMO
3.521

TUBO 160mm 10 MTS


AREA TUBO 0.020

VOLUMEN
VOLUMEN
AREA DE LA MATERIAL TUBERIA A RELLENO
EXC PROM SECCION EXCAVACIÓ
SELECCIONA DESCONTAR ARENA
N DO

0.4025 0.312 1.25 2.21 0.31 0.65


0.4885 0.379 1.14 MATERIAL DEL SITIO
0.5645 0.437 1.31 0.840
VOLUMEN TOTAL TRAMO
3.696
TUBO 200mm 10 MTS
AREA TUBO 0.031

MZA D)

VOLUMEN
VOLUMEN
AREA DE LA MATERIAL TUBERIA A RELLENO
EXC PROM SECCION EXCAVACIÓ SELECCIONA DESCONTAR ARENA
N
DO

0.8725 0.676 2.03 2.32 0.20 0.65


0.9425 0.730 2.19 MATERIAL DEL SITIO
1 0.775 3.10 4.351
VOLUMEN TOTAL TRAMO
7.320

TUBO 160mm 10 MTS


AREA TUBO 0.020

VOLUMEN
VOLUMEN
AREA DE LA MATERIAL TUBERIA A RELLENO
EXC PROM EXCAVACIÓ
SECCION SELECCIONA DESCONTAR ARENA
N
DO

0.9075 0.703 2.11 2.32 0.20 0.65


0.9875 0.765 2.30 MATERIAL DEL SITIO
1.0275 0.796 3.19 4.622
VOLUMEN TOTAL TRAMO
7.591

TUBO 160mm 10 MTS


AREA TUBO 0.020

MZA F)
VOLUMEN
VOLUMEN
AREA DE LA MATERIAL TUBERIA A RELLENO
EXC PROM EXCAVACIÓ
SECCION N SELECCIONA DESCONTAR ARENA
DO

1.27 0.984 2.95 2.32 0.20 0.65


1.343 1.041 3.12 MATERIAL DEL SITIO
1.401 1.086 4.34 7.449
VOLUMEN TOTAL TRAMO
10.418

TUBO 160mm 10 MTS


AREA TUBO 0.020

E)

VOLUMEN
VOLUMEN
EXC PROM AREA DE LA EXCAVACIÓ
MATERIAL TUBERIA A RELLENO
SECCION SELECCIONA DESCONTAR ARENA
N DO

1.265 0.980 3.92 2.21 0.31 0.65


1.2475 0.967 2.90 MATERIAL DEL SITIO
1.3075 1.013 3.04 7.006
VOLUMEN TOTAL TRAMO
9.862

TUBO 200mm 10 MTS


AREA TUBO 0.031

VOLUMEN
AREA DE LA VOLUMEN MATERIAL TUBERIA A RELLENO
EXC PROM EXCAVACIÓ
SECCION SELECCIONA DESCONTAR ARENA
N
DO

0.395 0.306 0.92 2.32 0.20 0.65


0.438 0.339 1.02 MATERIAL DEL SITIO
0.481 0.373 1.49 0.459
VOLUMEN TOTAL TRAMO
3.428

TUBO 160mm 10 MTS


AREA TUBO 0.020
CARMELO ALVIS SAS
NIT 800.190.413-4
INSTALACIONES HIDRAULICAS, SANITARIAS, GAS Y CONTRAINCENDIO

PROYECTO: MEDINA - DORAL


CONTRATISTA: CARMELO ALVIS SAS
ACTA DE OBRA No: 4
FECHA CORTE: 4-Nov-21

CUADRO DE PRECIOS Y CANTIDADES DE OBRA


CONTRATO ACTIVIDAD EJECTUTADA TOTAL ACTA 4 ACUMULADO P0R EJECUTAR
VALOR VALOR CANTIDAD VALOR CANT CANT VALOR CANT VALOR
VIA 6
VIA 1 VIA 2 VIA 3 VIA 4 VIA 5 VIA 13
Capit. DESCRIPCIÓN UND. CANT. ZONA
UNITARIO TOTAL MZA-MZB MZB'-MZC MZC'-MZD MZD'-MZF MZE MZM
SOCIAL
TOTAL TOTAL ANTERIOR ACTUAL ACTUAL

1 REDES ACUEDUCTO EXTERNAS CONJUNTO 1 $ 376,251,343.00 36,513,255.18 $ 178,740,151


1.1 Puntos
1,1,1 Punto Conexion de PEAD 110 mm UN 13 $ 170,740 $ 2,219,620 0.00 $ - 12.00 12.00 $ 2,048,880 1.00 $ 2,219,620
1,1,2 Punto Interfase de PEAD 110 mm a PEAD De ø32 UN 156 $ 100,027 $ 15,604,212
14 32 32 98.00 $ 9,802,646 58.00 $ 5,801,566
mm 78.00 $ 7,802,106.0 20.00
1,1,6 Puntos de Acometidas Domiciliaria De ø32 mm UN 156 $ 119,901 $ 18,704,556
14 32 32 98.00 $ 11,750,298 58.00 $ 6,954,258
Hasta medidor (Incluye tuberia) 78.00 $ 9,352,278.0 20.00
1.2 Acometida a Tanque Bajo 0.00
1,2,1 Suministro e instalación tubería PE 100, PN 10, 110 ML 54 $ 38,470 $ 2,077,380
70 70.00 $ 2,692,900 -16.00 $ (615,520)
mm 70.00 $ 2,692,900.0 0.00
Instalacion de Valvulas 0.00
1.12 Valvulas de control 0.00
1,12,1 Val Dado Flanchada De ø4" Un. 5 $ 1,477,345 $ 7,386,725 1 1.00 $ 1,477,345.0 0.00 1.00 $ 1,477,345 4.00 $ 5,909,380
1,12,2 Camara de Inspeccion 0,90 x 0,90 m UN 5$ 615,204 $ 3,076,020 0.00 $ - 0.00 0.00 $ - 5.00 $ 3,076,020
1,12,3 Sum e Inst Hidrante Tipo Londres 110mm HD, UN 2 $ 3,361,529 $ 6,723,058
1.4 1.40 $ 4,706,141 0.60 $ 2,016,917
bridada, PN 10   1.40 $ 4,706,140.6 0.00
1.3 Redes Distribucion 0.00
1.13,1 Suministro e instalación tubería PE 100, PN 10, 110 ML 2250 $ 42,600 $ 95,850,000
mm 23.59 10.35 9 2046.82 $ 87,194,532 203.18 $ 8,655,468
42.94 $ 1,829,244.0 2003.88
Otros 0.00 0.00
1.15 Movimientos de Tierra Mayor Diametro Red de
0.00
Distribucion 0.00
1,15,1 Localización y Replanteo redes   ML 2304 $ 5,329 $ 12,278,016 23.59 10.35 9 42.94 $ 228,827.3 2003.88 2046.82 $ 10,907,504 257.18 $ 1,370,512
1,15,2 Prueba hidrostatica   UN 2 $ 2,508,751 $ 5,017,502 0.00 $ - 0.00 0.00 $ - 2.00 $ 5,017,502
1,15,3 Cinta Señalización   ML 2304 $ 231 $ 532,224 0.00 $ - 0.00 0.00 $ - 2304.00 $ 532,224
1,15,4 Excavacion M3 1950 $ 16,381 $ 31,942,950 9.91 4.35 33.18 47.43 $ 777,029.5 831.90 879.33 $ 14,404,377 1070.67 $ 17,538,573
1,15,5 Relleno Arena ( Recebo arenoso)   M3 459 $ 67,730 $ 31,088,070 7.02 3.08 23.51 33.60 $ 2,276,058.7 497.35 530.96 $ 35,961,661 -71.96 $ (4,873,591)
1,15,6 Relleno en Zahorra compactada M3 110 $ 56,050 $ 6,165,500 0.00 $ - 110.27 110.27 $ 6,180,811 -0.27 $ (15,311)
1,15,7 Relleno Material del Sitio M3 1449 $ 15,500 $ 22,459,500 3.30 1.45 11.06 15.81 $ 245,079.8 371.79 387.60 $ 6,007,851 1061.40 $ 16,451,649
1,15,8 Retiro de material sobrante de excavaciones   M3 0 $ 41,249 $ - 0.00 $ - 0.00 0.00 $ - 0.00 $ -
1.16 Movimientos de Tierra Menor Diametro Acometidas
domiciliarias 0.00
1,16,1 Excavacion Ml. 593 $ 13,370 $ 7,928,410 44.8 96 96 236.80 $ 3,166,016.0 60.00 296.80 $ 3,968,216 296.20 $ 3,960,194
1,16,2 Relleno material seleccionado Ml. $ 15,633 $ - 0.00 0.00 0.00 $ - 0.00 $ -
1,16,3 Relleno material sitio Ml. 593 $ 8,278 $ 4,908,854 44.8 96 96 236.80 $ 1,960,230.4 60.00 296.80 $ 2,456,910 296.20 $ 2,451,944
1,16,4 Retiro Ml. 0 $ 4,386 $ - 0.00 $ - 0.00 0.00 $ - 0.00 $ -
2 REDES ALCANTARILLADO CONJUNTO 1 $ 493,090,290.14 36,425,307.06 0.00 0.00 $ - $ 257,422,106
2.1 Tubería Colectores Enterrados 0.00
De ø6" PVC-Sanitaria -Enterrada Ml. 404 $ 67,405 $ 27,231,620 3.4 6.8 13.6 23.80 $ 1,604,239 27.20 51.00 $ 3,437,655 353.00 $ 23,793,965
2.2 Camaras y Registros 0.00
2,2,1 Cámara de inspección H>1,60 y < 2,00 MTS Un. 1 $ 4,255,032 $ 4,255,032
cilíndricas en concreto 0.00 $ - 1.00 $ 4,255,032
0.00 $ - 0.00
2,2,3 Cámara de inspección H>1,40 y < 1,60 MTS Un. 14 $ 3,895,519 $ 54,537,266
1.4 0.7 2.10 $ 8,180,590 11.90 $ 46,356,676
cilíndricas en concreto 2.10 $ 8,180,590 0.00
2,2,4 Cámara de inspección H<1,40 MTS cilíndricas en Un. 5 $ 3,357,848 $ 16,789,240
0.7 0.70 $ 2,350,494 4.30 $ 14,438,746
concreto 0.70 $ 2,350,494 0.00
2,2,5 Cámara de inspección H<1,00 MTS cilíndricas en Un. 16 $ 2,853,355 $ 45,653,680
1.4 1.4 1.4 1.4 9.80 $ 27,962,879 6.20 $ 17,690,801
concreto 5.60 $ 15,978,788 4.20
Camara de Inspeccion 0,80 x 0,80 mt Un. 88 $ 460,884 $ 40,557,792 5 4 9.00 $ 4,147,956 0.00 9.00 $ 4,147,956 79.00 $ 36,409,836
Conexiones domiciliarias ø6" x ø6" Un. 32 $ 116,969 $ 3,743,008 2 4 8 14.00 $ 1,637,566 12.00 26.00 $ 3,041,194 6.00 $ 701,814
Conexiones domiciliarias ø8" x ø6" Un. 56 $ 133,969 $ 7,502,264 0.00 $ - 4.00 4.00 $ 535,876 52.00 $ 6,966,388
2.3 Movimientos de Tierra 0.00
2,3,1 Excavacion M3 2404.38 $ 31,581 $ 75,932,847 21.60 10.92 10.5 20.700 63.76 $ 2,013,478 1314.04 1377.80 $ 43,512,190 1026.59 $ 32,420,657
2,3,2 Relleno material seleccionado M3 278 $ 75,591 $ 21,014,298 0.00 $ - 278.03 278.03 $ 21,016,747 -0.03 $ (2,449)
2,3,3 Relleno de Arena M3 494.24 $ 67,670 $ 33,445,221 0.00 $ - 247.21 247.21 $ 16,728,858 247.03 $ 16,716,363
2,3,4 Relleno material sitio M3 1636.55 $ 17,400 $ 28,475,956 13.59 1.84 1.42 12.60 29.44 $ 512,196 781.76 811.20 $ 14,114,810 825.35 $ 14,361,146
2,3,5 Retiro de material sobrante de excavaciones   M3 $ 37,579 $ - 0.00 0.00 0.00 $ - 0.00 $ -
SUBTOTAL CAP REDES CONJUNTO 1 869,341,633 $ 72,938,562 $ 435,228,256 257,422,106

VALOR TOTAS COSTOS DIRECTOS 869,341,633 72,938,562.24 $ 435,228,256 436,162,257

COSTOS INDIRECTOS TOTAL COSTOS $ 72,938,562


TOTAL COSTOS DIRECTOS 869,341,633 DIRECTOS $ 435,228,256 $ 436,162,257
ADMINISTRACION 9.00% 78,240,747 9.00% $ 6,564,471 $ 39,170,543 $ 39,254,603
IMPREVISTOS 1.00% 8,693,416 1.00% $ 729,386 $ 4,352,283 $ 4,361,623
UTILIDAD 2.00% 17,386,833 2.00% $ 1,458,771 $ 8,704,565 $ 8,723,245
TOTAL AIU 12.00% 104,320,996 12.00% $ 8,752,627 $ 52,227,391 52,339,471
IVA SOBRE LA UTILIDAD 19.00% 3,303,498 19.00% $ 277,167 $ 1,653,867 $ 1,657,417
VALOR TOTAL PRESUPUESTO 976,966,127 VALOR TOTAL $ 81,968,356 $ 489,109,514 $ 490,159,144

DEDUCCIONES
ABONO A LA UNIDAD DE VIVIENDA ($334.000.000) 35.00% 25,528,497
AMORTIZACION DE ANTICIPO ($ 165.780.357) 20.00% 14,587,712
RETEGARANTIA DE OBRA 10.00% 7,293,856
TOTAL DEDEUCCIONES 65.00% 47,410,065
TOTAL DESPUES DE DEDUCCIONES 34,558,291

CONTRATISTA

ING. ANDRES PEREZ BARRIOS ING. ANDREA DUARTE OSORIO ING. CRISTIAN ALVIS YEPES
Ingeniero residente Director de obra Gerente

CONTRATANTE

JADER ACOSTA MEJIA ING. RICARDO UPARELA ACOSTA ING. ALBERTO CEPEDA FACIOLINCE
Topografo residente Director de obra Gerente
TUBERÍA DE ACUEDUCTO
VÍA 1 (MZA A - MZA B)
ITEM DESCRIPCION VIA 4 VIA 5 VIA 6
TUBERIA DE 110 mm 23.59 10.35 79
EXCAVACION 9.91 4.35 33.18
RELLENO ARENA 6.38 2.80 21.37
RELLENO MAT. DEL SITIO 3.30 1.45 11.06

EXCAVACION DE MANHOLES
N° PROF ANCHO LONG VOLUMEN
MH-35 1 1.8 2.5 4.5
MH-38 1.4 1.8 2.5 6.3
MH-39 1 1.8 2.5 4.5
MH-41 1.4 1.8 2.5 6.3
MH-42 1 1.8 2.5 4.5
MH-45 1 1.8 2.5 4.5
MH-49 1 1.8 2.5 4.5
MH-52 1 1.8 2.5 4.5
MH-58 1 1.8 2.5 4.5
MH-59 1.6 1.8 2.5 7.2
MH-61 1 1.8 2.5 4.5
MH-62 1 1.8 2.5 4.5
VOL T 39.6
CTO
A B)
CARMELO ALVIS SAS
NIT 800.190.413-4
INSTALACIONES HIDRAULICAS, SANITARIAS, GAS Y CONTRAINCENDIO

PROYECTO: MEDINA - DORAL


CONTRATISTA: CARMELO ALVIS SAS
ACTA DE OBRA No: 5
FECHA CORTE: 5-Dec-21

CUADRO DE PRECIOS Y CANTIDADES DE OBRA


CONTRATO ACTIVIDAD EJECTUTADA TOTAL ACTA 5 ACUMULADO P0R EJECUTAR
VALOR VALOR CANTIDAD VALOR CANT CANT VALOR CANT VALOR
VIA 6
VIA 1 VIA 2 VIA 3 VIA 4 VIA 5 VIA 13
Capit. DESCRIPCIÓN UND. CANT. ZONA
UNITARIO TOTAL MZA-MZB MZB'-MZC MZC'-MZD MZD'-MZF MZE MZM
SOCIAL
TOTAL TOTAL ANTERIOR ACTUAL ACTUAL

1 REDES ACUEDUCTO EXTERNAS CONJUNTO 1 $ 376,251,343.00 28,710,884.36 $ 150,029,267


1.1 Puntos
1,1,1 Punto Conexion de PEAD 110 mm UN 13 $ 170,740 $ 2,219,620 0.00 $ - 12.00 12.00 $ 2,048,880 1.00 $ 2,219,620 11 1.00
1,1,2 Punto Interfase de PEAD 110 mm a PEAD De ø32 UN 156 $ 100,027 $ 15,604,212
30 18 10 156.00 $ 15,604,212 0.00 $ -
mm 58.00 $ 5,801,566.0 98.00 0 156.00
1,1,3 Punto Interfase de PEAD 110 mm a PVC De ø4" UN 1$ 220,667 $ 220,667
0.00 $ - 1.00 $ 220,667
0.00 $ - 0.00 0 0.00
1,1,4 Punto Interfase de PEAD 110 mm a PVC De ø1" UN 2 $ 86,523 $ 173,046
0.00 $ - 2.00 $ 173,046
0.00 $ - 0.00 0 0.00
1,1,5 Punto Interfase de PEAD 110 mm a PVC De ø3/4" UN 1 $ 84,426 $ 84,426
0.00 $ - 1.00 $ 84,426
0.00 $ - 0.00 0 0.00
1,1,6 Puntos de Acometidas Domiciliaria De ø32 mm UN 156 $ 119,901 $ 18,704,556
30 18 10 156.00 $ 18,704,556 0.00 $ -
Hasta medidor (Incluye tuberia) 58.00 $ 6,954,258.0 98.00 86 70.00
1,1,7 Punto de Ventilacion Tanques De ø4" UN 2 $ 42,468 $ 84,936 0.00 $ - 0.00 0.00 $ - 2.00 $ 84,936 0 0.00
1,1,8 Punto de Valvula Ventosa De ø2" UN 1 $ 99,638 $ 99,638 1 1.00 $ 99,638.0 0.00 1.00 $ 99,638 0.00 $ - 1 0.00
1.2 Acometida a Tanque Bajo 0.00 0 0.00
1,2,1 Suministro e instalación tubería PE 100, PN 10, 110 ML 54 $ 38,470 $ 2,077,380
70.00 $ 2,692,900 -16.00 $ (615,520)
mm 0.00 $ - 70.00 70 0.00
1.3 Valvula de Compuerta 0.00 0 0.00
1,3.1 Valv. Compuerta RW 4" UN 2 $ 1,079,797 $ 2,159,594 0.00 $ - 0.00 0.00 $ - 2.00 $ 2,159,594 0 0.00
1.4 Válvulas de Flotador 0.00 0 0.00
1,4,1 Val Flotador De ø4" Con piloto Autom. Un. 2 $ 3,247,455 $ 6,494,910 0.00 $ - 0.00 0.00 $ - 2.00 $ 6,494,910 0 0.00
1,4,2 Camara de Inspeccion De 0,40 x 0,40 Un. 1$ 301,703 $ 301,703 0.00 $ - 0.00 0.00 $ - 1.00 $ 301,703 0 0.00
1.5 Conexiones a Tanques 0.00 0 0.00
1,5,1 Pasamuro De ø4"× 0.60 m A. Inoxidable Un. 2 $ 1,401,639 $ 2,803,278 0.00 $ - 0.00 0.00 $ - 2.00 $ 2,803,278 0 0.00
Ventilacion 0.00 0 0.00
1.6 Conexiones a Tanques 0.00 0 0.00
1,6,1 Pasamuro De ø4"× 0.60 m A. Inoxidable Un. 2 $ 1,401,639 $ 2,803,278 0.00 $ - 0.00 0.00 $ - 2.00 $ 2,803,278 0 0.00
Succion Tanque Bajo Etapa No 2 0.00 0 0.00
1.7 Tubería PVC Presión 0.00 0 0.00
1,7,1 Tuberia PVC De ø4" ML 14 $ 82,324 $ 1,152,536 0.00 $ - 0.00 0.00 $ - 14.00 $ 1,152,536 0 0.00
1.8 Conexiones a Tanques $ - 0.00 0.00 $ - 0.00 $ - 0 0.00
1,8,1 Pasamuro De ø4"× 0.60 m A. Inoxidable Un. 4 $ 1,401,639 $ 5,606,556 0.00 $ - 0.00 0.00 $ - 4.00 $ 5,606,556 0 0.00
1.9 Válvulas de Pie 0.00 0 0.00
1,9,1 Val Pie De ø4" UN 4 $ 1,005,068 $ 4,020,272 0.00 $ - 0.00 0.00 $ - 4.00 $ 4,020,272 0 0.00
Bypass 0.00 0 0.00
Valvula de Dado 0.00 0 0.00
Valv. Dado ø3" UN 1 $ 1,196,747 $ 1,196,747 0.00 $ - 0.00 0.00 $ - 1.00 $ 1,196,747 0 0.00
Tuberia PVC De ø3" ML 4 $ 48,172 $ 192,688 0.00 $ - 0.00 0.00 $ - 4.00 $ 192,688 0 0.00
Conexiones a Tanques 0.00 0 0.00
Pasamuro De ø3"× 0.60 m A. Inoxidable Un. 2 $ 2,005,639 $ 4,011,278 0.00 $ - 0.00 0.00 $ - 2.00 $ 4,011,278 0 0.00
Redes Impulsion Etapa No 2 0.00 0 0.00
1.1 Tubería PVC Presión 0.00 0 0.00
1,10,1 Tuberia PVC De ø4" ML 12 $ 82,324 $ 987,888 0.00 $ - 0.00 0.00 $ - 12.00 $ 987,888 0 0.00
1.11 Tubería PVC Presión RDE 9 - 21 - Retorno
Retrolavado 0.00 0 0.00
1,11,1 Tuberia PVC -P De ø3/4" Ml. 3 $ 7,334 $ 22,002 0.00 $ - 0.00 0.00 $ - 3.00 $ 22,002 0 0.00
1,11,2 Valvula Compuerta de drenaje De ø3/4" Un. 1 $ 69,294 $ 69,294 0.00 $ - 0.00 0.00 $ - 1.00 $ 69,294 0 0.00
Valv. Compuerta RW 4" UN 1 $ 1,079,797 $ 1,079,797 0.00 $ - 0.00 0.00 $ - 1.00 $ 1,079,797 0 0.00
Instalacion de Valvulas 0.00 0 0.00
1.12 Valvulas de control 0.00 0 0.00
1,12,1 Val Dado Flanchada De ø4" Un. 5 $ 1,477,345 $ 7,386,725 2 2.00 $ 2,954,690.0 1.00 3.00 $ 4,432,035 2.00 $ 2,954,690 3 0.00
1,12,2 Camara de Inspeccion 0,90 x 0,90 m UN 5$ 615,204 $ 3,076,020 1 1.00 $ 615,204.0 0.00 1.00 $ 615,204 4.00 $ 2,460,816 1 0.00
1,12,3 Sum e Inst Hidrante Tipo Londres 110mm HD, UN 2 $ 3,361,529 $ 6,723,058
bridada, PN 10   0.3 1.70 $ 5,714,599 0.30 $ 1,008,459
0.30 $ 1,008,458.7 1.40 1 0.70
Valvulas 0.00 0 0.00
Valvula Ventosa De 2" Un. 1 $ 1,199,772 $ 1,199,772 1 1.00 $ 1,199,772.0 0.00 1.00 $ 1,199,772 0.00 $ - 2062.63 -2061.63
Camara de Inspeccion Para Valvula de Ventosa UND 1 $ 1,775,547 $ 1,775,547
incluye el tabique 1,00 x 0,70 m 0.7 0.70 $ 1,242,883 0.30 $ 532,664
0.70 $ 1,242,882.9 0.00 0 0.70
1.3 Redes Distribucion 0.00 0 0.00
1.13,1 Suministro e instalación tubería PE 100, PN 10, 110 ML 2250 $ 42,600 $ 95,850,000
7.2 7.2 7.2 7.2 31.5 2107.12 $ 89,763,312 142.88 $ 6,086,688
mm 60.30 $ 2,568,780.0 2046.82 0 2107.12
1.14 Equipo de Bombeo Sistema de Suministro de Agua
0.00
Potable ET 2 0.00 0 0.00
1,14,1 Suministro y conexión hidráulica Equipo de Bombeo UN 1 $ 65,748,893 $ 65,748,893
Velocidad Variable. Condiciones de operación: Q=
28,00 lps, H=44,0 mt. Consistente en 4 bombas,
incluye tableros y demás accesorios para el correcto 0.00 $ - 1.00 $ 65,748,893
funcionamiento. No incluye cableado.

0.00 $ - 0.00 0 0.00


Otros 0.00 0.00 0 0.00
1.15 Movimientos de Tierra Mayor Diametro Red de
0.00
Distribucion 0.00 0 0.00
1,15,1 Localización y Replanteo redes   ML 2304 $ 5,329 $ 12,278,016 0.00 $ - 2046.82 2046.82 $ 10,907,504 257.18 $ 1,370,512 0 2046.82
1,15,2 Prueba hidrostatica   UN 2 $ 2,508,751 $ 5,017,502 0.00 $ - 0.00 0.00 $ - 2.00 $ 5,017,502 2132.63 -2132.63
1,15,3 Cinta Señalización   ML 2304 $ 231 $ 532,224 0.00 $ - 0.00 0.00 $ - 2304.00 $ 532,224 0 0.00
1,15,4 Excavacion M3 1950 $ 16,381 $ 31,942,950 12.60 12.60 $ 206,400.6 879.33 891.93 $ 14,610,777 1058.07 $ 17,332,173 0 891.93
1,15,5 Relleno Arena ( Recebo arenoso)   M3 459 $ 67,730 $ 31,088,070 8.11 8.11 $ 549,622.2 530.96 539.07 $ 36,511,283 -80.07 $ (5,423,213) 0 539.07
1,15,6 Relleno en Zahorra compactada M3 110 $ 56,050 $ 6,165,500 0.00 $ - 110.27 110.27 $ 6,180,811 -0.27 $ (15,311) 0 110.27
1,15,7 Relleno Material del Sitio M3 1449 $ 15,500 $ 22,459,500 4.62 4.62 $ 71,610.0 387.60 392.22 $ 6,079,461 1056.78 $ 16,380,039 380 12.22
1,15,8 Retiro de material sobrante de excavaciones   M3 0 $ 41,249 $ - 0.00 $ - 0.00 0.00 $ - 0.00 $ - 0 0.00
1.16 Movimientos de Tierra Menor Diametro Acometidas
domiciliarias 0.00 260 -260.00
1,16,1 Excavacion Ml. 593 $ 13,370 $ 7,928,410 30.00 30.00 30.00 120 54 35 299.00 $ 3,997,630.0 296.80 595.80 $ 7,965,846 -2.80 $ (37,436) 15 580.80
1,16,2 Relleno material seleccionado Ml. $ 15,633 $ - 0.00 0.00 0.00 $ - 0.00 $ - 0 0.00
1,16,3 Relleno material sitio Ml. 593 $ 8,278 $ 4,908,854 90 54 30 174.00 $ 1,440,372.0 296.80 470.80 $ 3,897,282 122.20 $ 1,011,572 470.80
1,16,4 Retiro Ml. 0 $ 4,386 $ - 0.00 $ - 0.00 0.00 $ - 0.00 $ - 0.00
2 REDES ALCANTARILLADO CONJUNTO 1 $ 493,090,290.14 51,324,830.37 0.00 0.00 $ - $ 206,097,275 0.00
2.1 Tubería Colectores Enterrados 0.00 0.00
2,1,1 De ø4" PVC-Sanitaria -Enterrada Ml. 114 $ 30,099 $ 3,431,286 0.00 $ - 0.00 0.00 $ - 114.00 $ 3,431,286 0 0.00
De ø6" PVC-Sanitaria -Enterrada Ml. 404 $ 67,405 $ 27,231,620 10.2 10.2 22.1 42.50 $ 2,864,713 51.00 93.50 $ 6,302,368 310.50 $ 20,929,253 23.8 69.70
2,1,2 De ø160 mm PVC-Pared Estructurada - Enterrada Ml. 624 $ 40,159 $ 25,059,216
604.50 $ 24,276,116 19.50 $ 783,101
0.00 $ - 604.50 594.5 10.00
2,1,3 De ø200 mm PVC-Pared Estructurada - Enterrada Ml. 1176 $ 53,351 $ 62,740,776
1119.00 $ 59,699,769 57.00 $ 3,041,007
0.00 $ - 1119.00 1118.9 0.10
2.2 Camaras y Registros 0.00 0 0.00
2,2,1 Cámara de inspección H>1,60 y < 2,00 MTS Un. 1 $ 4,255,032 $ 4,255,032
0.00 $ - 1.00 $ 4,255,032
cilíndricas en concreto 0.00 $ - 0.00 0 0.00
2,2,3 Cámara de inspección H>1,40 y < 1,60 MTS Un. 14 $ 3,895,519 $ 54,537,266
cilíndricas en concreto 1.4 1.4 1.4 0.7 7.00 $ 27,268,633 7.00 $ 27,268,633
4.90 $ 19,088,043 2.10 5.6 1.40
2,2,4 Cámara de inspección H<1,40 MTS cilíndricas en Un. 5 $ 3,357,848 $ 16,789,240
concreto 0.7 1.40 $ 4,700,987 3.60 $ 12,088,253
0.70 $ 2,350,494 0.70 0.7 0.70
2,2,5 Cámara de inspección H<1,00 MTS cilíndricas en Un. 16 $ 2,853,355 $ 45,653,680
concreto 9.80 $ 27,962,879 6.20 $ 17,690,801
0.00 $ - 9.80 9.8 0.00
2,2,6 Camara de Inspeccion 1,00 x 1,00 mt Un. 0 $ 699,174 $ - 0.00 $ - 0.00 0.00 $ - 0.00 $ - 0 0.00
2,2,7 Camara de Inspeccion 0,60 x 0,60 mt Un. 8 $ 333,895 $ 2,671,160 0.00 $ - 0.00 0.00 $ - 8.00 $ 2,671,160 0 0.00
Camara de Inspeccion 0,80 x 0,80 mt Un. 88 $ 460,884 $ 40,557,792 16 11 12 39.00 $ 17,974,476 9.00 48.00 $ 22,122,432 40.00 $ 18,435,360 35.4 12.60
2,2,8 Conexiones domiciliarias ø6" x ø4" Un. 0 $ 102,118 $ - 0.00 $ - 0.00 0.00 $ - 0.00 $ - 0 0.00
Conexiones domiciliarias ø6" x ø6" Un. 32 $ 116,969 $ 3,743,008 5 5.00 $ 584,845 26.00 31.00 $ 3,626,039 1.00 $ 116,969 24 7.00
2,2,9 Conexiones domiciliarias ø8" x ø4" Un. $ 115,777 $ - 0.00 0.00 0.00 $ - 0.00 $ - 0 0.00
Conexiones domiciliarias ø8" x ø6" Un. 56 $ 133,969 $ 7,502,264 6 6 8 20.00 $ 2,679,380 4.00 24.00 $ 3,215,256 32.00 $ 4,287,008 24 0.00
2,2,10 Conexiones domiciliarias a Manhol Un. 13 $ 40,800 $ 530,400 0.00 $ - 0.00 0.00 $ - 13.00 $ 530,400 0 0.00
2.3 Movimientos de Tierra 0.00 0 0.00
2,3,1 Excavacion M3 2404.38 $ 31,581 $ 75,932,847 25.17 40.42 47.46 18.150 15.548 146.75 $ 4,634,480 1377.80 1524.55 $ 48,146,670 879.84 $ 27,786,177 252 1272.55
2,3,2 Relleno material seleccionado M3 278 $ 75,591 $ 21,014,298 0.00 $ - 278.03 278.03 $ 21,016,747 -0.03 $ (2,449) 0 278.03
2,3,3 Relleno de Arena M3 494.24 $ 67,670 $ 33,445,221 0.00 $ - 247.21 247.21 $ 16,728,858 247.03 $ 16,716,363 1713.4 -1466.19
2,3,4 Relleno material sitio M3 1636.55 $ 17,400 $ 28,475,956 19.80 19.80 26.40 66.00 $ 1,148,400 811.20 877.20 $ 15,263,210 759.35 $ 13,212,746 144 733.20
2,3,5 Retiro de material sobrante de excavaciones   M3 $ 37,579 $ - 0.00 0.00 0.00 $ - 0.00 $ - 0 0.00
2.4 Otros 0.00 0 0.00
2,4,1 Localización y Replanteo redes   ML 2318 $ 3,866 $ 8,961,388 0.00 $ - 1723.50 1723.50 $ 6,663,051 594.50 $ 2,298,337 1713.4 10.10
2,4,2 Prueba de estanqueidad   ML 2318 $ 2,886 $ 6,689,748 0.00 $ - 0.00 0.00 $ - 2318.00 $ 6,689,748 0 0.00
2,4,3 Cinta Señalización   ML 2318 $ 231 $ 535,458 0.00 $ - 0.00 0.00 $ - 2318.00 $ 535,458 0 0.00
2.5 Estacion de Bombeo 0.00 0 0.00
2,5,1 Suministro y conexión hidráulica Equipo de Bombeo. UN 1 $ 11,451,708 $ 11,451,708
Condiciones de operación: Q= 8.70Lps,
Cabeza=10mt. Consistente en 2 bomba, incluye
arrancador, suiches de nivel y demás accesorios 0.00 $ - 1.00 $ 11,451,708
para el correcto funcionamiento. No incluye
cableado.
0.00 $ - 0.00 0 0.00
2,5,2 Tuberia Presion De ø3" ML 92 $ 46,597 $ 4,286,924 0.00 $ - 0.00 0.00 $ - 92.00 $ 4,286,924 0 0.00
2.6 Válvulas de Compuerta 0.00 0 0.00
2,6,1 De ø3" UN 2$ 669,429 $ 1,338,858 0.00 $ - 0.00 0.00 $ - 2.00 $ 1,338,858 0 0.00
2.7 Válvulas de Cheque 0.00 0 0.00
2,7.1 De ø3" UN 2$ 719,825 $ 1,439,650 0.00 $ - 0.00 0.00 $ - 2.00 $ 1,439,650 0 0.00
2,7,2 Camara de Inspeccion 1,50 x 1,50 mt UN 1 $ 4,815,494 $ 4,815,494 0.00 $ - 0.00 0.00 $ - 1.00 $ 4,815,494 0 0.00
SUBTOTAL CAP REDES CONJUNTO 1 869,341,633 $ 80,035,715 $ 515,263,971 206,097,275

VALOR TOTAS COSTOS DIRECTOS 869,341,633 80,035,714.73 $ 515,263,971 356,126,542

COSTOS INDIRECTOS TOTAL COSTOS $ 80,035,715


TOTAL COSTOS DIRECTOS 869,341,633 DIRECTOS $ 515,263,971 $ 356,126,542
ADMINISTRACION 9.00% 78,240,747 9.00% $ 7,203,214 $ 46,373,757 $ 32,051,389
IMPREVISTOS 1.00% 8,693,416 1.00% $ 800,357 $ 5,152,640 $ 3,561,265
UTILIDAD 2.00% 17,386,833 2.00% $ 1,600,714 $ 10,305,279 $ 7,122,531
TOTAL AIU 12.00% 104,320,996 12.00% $ 9,604,286 $ 61,831,677 42,735,185
IVA SOBRE LA UTILIDAD 19.00% 3,303,498 19.00% $ 304,136 $ 1,958,003 $ 1,353,281
VALOR TOTAL PRESUPUESTO 976,966,127 VALOR TOTAL $ 89,944,136 $ 579,053,650 $ 400,215,008

DEDUCCIONES
ABONO A LA UNIDAD DE VIVIENDA ($334.000.000) 35.00% 28,012,500
AMORTIZACION DE ANTICIPO ($ 165.780.357) 20.00% 16,007,143
RETEGARANTIA DE OBRA 10.00% 8,003,571
TOTAL DEDEUCCIONES 65.00% 52,023,215
TOTAL DESPUES DE DEDUCCIONES 37,920,922

CONTRATISTA

ING. ANDRES PEREZ BARRIOS ING. ANDREA DUARTE OSORIO ING. CRISTIAN ALVIS YEPES
Ingeniero residente Director de obra Gerente

CONTRATANTE

JADER ACOSTA MEJIA ING. RICARDO UPARELA ACOSTA ING. ALBERTO CEPEDA FACIOLINCE
Topografo residente Director de obra Gerente
TUBERÍA DE ACUEDUCTO
VÍA 1 (MZA A - MZA B)
ITEM DESCRIPCION VIA 6
TUBERIA DE 110 mm 30
EXCAVACION 12.60
RELLENO ARENA 8.11
RELLENO MAT. DEL SITIO 4.20

EXCAVACION DE MANHOLES
VOLUMEN
N° PROF ANCHO LONG EXCAVADO
MH-44 1.6 2.2 2 7.04
MH-47 1.7 2.3 2.1 8.211
MH-51 1.6 2.1 2.3 7.728
MH-54 1.7 2.4 2.1 8.568
MH-60 1.6 2.5 2.2 8.8
MH-63 1.7 2.2 2.5 9.35
MH-64 1.4 2 2.3 6.44
MH-65 1.8 2.3 2.2 9.108
VOL T 56.137

EXCAVACION DE REGISTROS
MANZANA CASAS PROF ANCHO LONG VOLUMEN
A 2-3 0.7 0.8 0.8 0.448
A 4-5 0.7 0.8 0.8 0.448
A 6-7 0.7 0.8 0.8 0.448
A 8-9 0.7 0.8 0.8 0.448
A 10-11 0.7 0.8 0.8 0.448
A 12-13 0.7 0.8 0.8 0.448
A 14-15 0.7 0.8 0.8 0.448
A 16-17 0.7 0.8 0.8 0.448
B 1 0.7 0.8 0.8 0.448
B 2-3 0.7 0.8 0.8 0.448
B 4-5 0.7 0.8 0.8 0.448
B 6-7 0.7 0.8 0.8 0.448
B 8-9 0.7 0.8 0.8 0.448
B 10-11 0.7 0.8 0.8 0.448
B 12-13 0.7 0.8 0.8 0.448
B 14-15 0.7 0.8 0.8 0.448
B' 17 0.7 0.8 0.8 0.448
B' 18-19 0.7 0.8 0.8 0.448
B' 20-21 0.7 0.8 0.8 0.448
B' 22-23 0.7 0.8 0.8 0.448
B' 24-25 0.7 0.8 0.8 0.448
B' 26-27 0.7 0.8 0.8 0.448
B' 28-29 0.7 0.8 0.8 0.448
B' 30-31 0.7 0.8 0.8 0.448
C 1 0.7 0.8 0.8 0.448
C 2-3 0.7 0.8 0.8 0.448
C 4-5 0.7 0.8 0.8 0.448
C 6-7 0.7 0.8 0.8 0.448
C 8-9 0.7 0.8 0.8 0.448
C 10-11 0.7 0.8 0.8 0.448
C 12-13 0.7 0.8 0.8 0.448
C 14-15 0.7 0.8 0.8 0.448
C' 17 0.7 0.8 0.8 0.448
C' 18-19 0.7 0.8 0.8 0.448
C' 20-21 0.7 0.8 0.8 0.448
C' 22-23 0.7 0.8 0.8 0.448
C' 24-25 0.7 0.8 0.8 0.448
C' 26-27 0.7 0.8 0.8 0.448
C' 28-29 0.7 0.8 0.8 0.448
C' 30-31 0.7 0.8 0.8 0.448
D 1 0.7 0.8 0.8 0.448
D 2-3 0.7 0.8 0.8 0.448
D 4-5 0.7 0.8 0.8 0.448
D 6-7 0.7 0.8 0.8 0.448
D 8-9 0.7 0.8 0.8 0.448
D 10-11 0.7 0.8 0.8 0.448
D 12-13 0.7 0.8 0.8 0.448
D 14-15 0.7 0.8 0.8 0.448
CTO