SUBTOTAL (No
ITEM DESCRIPCION COSTO DIRECTO G.G. (5%) UTI (7%)
incluye Igv)
1.00 EXPEDIENTE TECNICO DE ESTRUCTURAS S/. 90,000.00 S/. 4,500.00 S/. 6,300.00 S/. 100,800.00
2.00 CORTE DE TERRENO HASTA NIVEL DE SUBRASANTE - ETAPA 1 S/. 154,670.10 S/. 7,733.51 S/. 10,826.91 S/. 173,230.51
3.00 CORTE DE TERRENO HASTA NIVEL DE SUBRASANTE - ETAPA 2 S/. 123,747.93 S/. 6,187.40 S/. 8,662.36 S/. 138,597.68
4.00 NAVE INDUSTRIAL (SOLO OBRA CIVIL) S/. 1,915,972.39 S/. 95,798.62 S/. 134,118.07 S/. 2,145,889.08
5.00 ZONA DE SERVICIOS COMPLEMENTARIOS S/. 1,234,868.87 S/. 61,743.44 S/. 86,440.82 S/. 1,383,053.13
6.00 ZONA DE CIRCULACION, ESTACIONAMIENTO VEHICULAR Y AREAS VERDES S/. 166,630.13 S/. 8,331.51 S/. 11,664.11 S/. 186,625.75
7.00 PATIO DE MANIOBRAS S/. 248,992.48 S/. 12,449.62 S/. 17,429.47 S/. 278,871.58
8.00 INGRESO Y SALIDA DE VEHICULOS PESADOS S/. 111,359.08 S/. 5,567.95 S/. 7,795.14 S/. 124,722.17
9.00 ACI + D&A S/. 3,164,423.40 S/. 158,221.17 S/. 221,509.64 S/. 3,544,154.21
SUBTOTAL (No
incluye Igv) S/. 8,075,944.11
RESUMEN DE PARTIDAS
Presupuesto REFERENCIAL
TC: 3.35
PLAZO (mes) 5
FECHA: 12/15/2022
114737.5
9,500.00
9,500.00 9,500.00
24,750.00
24,750.00 24,750.00
2566280.9
134,730.00
94,830.00 94,830.00
3,700.00 3,700.00
17,500.00 17,500.00
3,200.00 3,200.00
12,000.00 12,000.00
3,500.00 3,500.00
191,000.00
89,500.00 179,000.00
12,000.00 12,000.00
39,800.00
9,000.00 9,000.00
28,000.00 28,000.00
2,800.00 2,800.00
209,200.00
45,700.00 45,700.00
95,000.00 95,000.00
9,000.00 9,000.00
7,500.00 7,500.00
4,500.00 4,500.00
47,500.00 47,500.00
39,400.00
5,500.00 5,500.00
21,900.00 21,900.00
3,500.00 3,500.00
8,500.00 8,500.00
151,924.00
4.88 133,224.00
18,700.00 18,700.00
432820
47,500.00
28,700.00 28,700.00
18,800.00 18,800.00
81,700.00
64,500.00 64,500.00
17,200.00 17,200.00
50585
5,500.00
5,500.00 5,500.00
5,000.00
2,800.00 2,800.00
2,200.00 2,200.00
1,800.00
1,800.00 1,800.00
2,800.00
2,800.00 2,800.00
3164423.4
ubTotal Costo Directo: $ 944,604.00 114737.5 3049685.9
.Generales y Utlidad: 12% $ 113,352.48
otal Presupuesto Estimado: $ 1,057,956.48
114737.5
2566280.9
432820
50585
CONSIDERACIONES - MMG
1
2
3
4
5
6
7
8
ITEMIZADO DEL PROYECTO
9.1.3.1 ELIMINACION M3
9.20 OBRAS DE CONCRETO SIMPLE
9.2.1 SOLADO e=5cm M2
1.00 105.50 1.30
2.00 71.60 1.20
1.00 105.50 1.20
52.00 2.00 2.00
CURADO M2
9.3.3 MURO DE CONTENCION
9.3.1.1 CONCRETO F'C=210 KG/CM2 M3
1.00 105.50 0.25 1.40
2.00 71.60 0.25 1.40
1.00 105.50 0.25 1.40
9.3.1.2 ENCOFRADO Y DESENCOFRADO NORMAL M2
1.00 105.50 2.00 1.40
2.00 71.60 2.00 1.40
1.00 105.50 2.00 1.40
9.3.1.3 ACERO DE REFUERZO ESTRUCTURAL KG
CURADO M2
9.3.4 LOSA DE PISO (ALMACEN)
9.3.4.1 CONCRETO F'C=210 KG/CM2 M3 7,150.00
9.3.5 LOSA DE PISO (PATIO DE MANIOBRAS)
9.3.5.1 CONCRETO F'C=210 KG/CM2 M3 1,810.00
9.3.5 LOSA DE PISO (circulación)
9.3.5.1 CONCRETO F'C=210 KG/CM2 M2 296.09
9.3.5.2 ENCOFRADO Y DESENCOFRADO NORMAL M2 281.29
9.3.5.3 ACERO DE REFUERZO ESTRUCTURAL KG 24,369.90
CURADO M2 1,080.45
9.3.6 ESTRUCTURAS METALICAS DE MACHINE SHOP DCP
9.3.6.1 ESTRUCTURAS METÁLICA, INCLUYE LA FABRICACION Y MONTAJES KG
74.90 7,150.00
9.3.7 SARDINELES
CONCRETO F'C=210 KG/CM2 M3
27.00
ENCOFRADO Y DESENCOFRADO NORMAL M2 216.00
ACERO DE REFUERZO ESTRUCTURAL KG 1,080.00
CURADO M2 216.00 -
9.3.7 ELEMENTOS DE CONFINAMIENTO DE MURO DE CERCO
CONCRETO F'C=210 KG/CM2 M3
248.70 0.25 0.25 1.00
62.00 0.25 0.25 2.00
ENCOFRADO Y DESENCOFRADO NORMAL M2
62.00 1.00 2.00
248.70 0.25 2.00 1.00
ACERO DE REFUERZO ESTRUCTURAL KG
62.00 12.00 2.00
248.70 12.00 1.00
CURADO M2
10.00 ARQUITECTURA
10.10 MUROS Y TABIQUES
10.1.1 MURO DE ALBAÑILERIA M2
1.00 105.50 2.00
2.00 71.60 2.00
10.20 CERRAMIENTO
10.2.1 PANEL METÁLICO TR-4 COLOR AZUL RAL 5007 M2
1.00 353.00 14.00
10.30 REVOQUES ENLUCIDOS Y MOLDADURAS
10.3.1 SOLAQUEO DE COLUMNAS Y MUROS M2
10.50 PISOS Y PAVIMENTOS
10.5.1 PISO DE CEMENTO FROTACHADO M2 1,080.45
10.60 CUBIERTAS
10.6.2 PANEL METÁLICO TCAx1000X0.6 CON AISLANTE e=450mm M2 1.20 7,150.00
10.70 CARPINTERIA METALICA
10.7.2.1 REJAS METALICAS DE AREAS DE SERVICIO M2 70.00 3.50
10.7.3 PINTURA
10.7.3.1 PINTURA PARA MUROS M2
PINTURA DE TRAFICO ACRILICA 4-AMARILLO ML 180.00
PINTURA ZONA DE EVACUACION-AMARILLO M2 1.00 80.00 1.20
DO DEL PROYECTO
REVISIÓN : 0
UBICACIÓN : Callao
FECHA 21/19
parcial total
592.42
89.15
146.06
107.61
249.60
173.26
34.37
25.32
113.57
6,525.00
6,525.00
-
7,250.00
7,250.00
#REF!
643.59
137.15
171.84
126.60
208.00
386.15
124.80
82.29
103.10
75.96
674.64
249.60
126.60
171.84
126.60
21,238.47
674.64
6.50
6.50
52.00
52.00
1,625.00
52.00
123.97
36.93
50.12
36.93
991.76
295.40
400.96
295.40
12,397.00
991.76
7,150.00 7,150.00
1,810.00 1,810.00
296.09 296.09
281.29 281.2855
24,369.90 24369.9
1,080.45 1080.45
535,535.00
535,535.00
27.00
27.00
216.00 216.00
1,080.00 1,080.00
216.00 216.00
23.29
15.54
7.75
248.35
124.00
124.35
4,472.40
1,488.00
2,984.40
248.35
497.40
211.00
286.40
4,942.00
4,942.00
497.40
1,080.45 1,080.45
8,580.00 8,580.00
245.00 245.00
19.45 745.75
180.00 180.00
96.00 96.00
#REF!
GASTOS GENERALES DE OPERACIÓN DE OFICINA EN OBRA
Proyecto: Almacén y Planta de Producción
Propietario: RESINPLAST
SUBTOTAL 1 210,319.20
SUBTOTAL 2 4,486.20
3.00 SERVICIOS
SUBTOTAL 3 3,210.00
SUBTOTAL 4 75,832.86
5.01 ARNES AMERICANO DOBLE IMPACTO UND 0.25 50.00 249.50 3,118.75
5.02 CASCO CON MENTONERA UND 0.50 50.00 14.80 370.00
5.03 ZAPATOS PAR 1.00 50.00 38.00 1,900.00
5.04 UNIFORME UND 1.00 50.00 54.92 2,746.00
5.05 CHALECO UND 0.50 50.00 28.00 700.00
5.06 LENTES ANTIEMPAÑANTES UND 1.00 50.00 3.10 155.00
5.07 TAPON DE OIDO UND 1.00 50.00 1.50 75.00
5.08 OREJERA UND 0.20 50.00 30.00 300.00
5.08 GUANTES CARPINTERO UND 1.00 50.00 12.00 600.00
5.09 GUANTES P/FIERRERO UND 1.00 50.00 6.50 325.00
5.10 MASCARILLAS CAJ 2.00 50.00 27.00 2,700.00 12,989.75
5.10 LINEA DE VIDA DE 5/8" ML 1.00 200.00 4.00 800.00
5.11 CINTA DE SEGURIDAD ROLLO 1.00 50.00 34.00 1,700.00
5.12 MALLA NARANJA ROLLO 1.00 50.00 48.00 2,400.00
5.12 LETREROS DE SEÑALIZACION DE OBRA UND 1.00 120.00 120.00 14,400.00 19300.00
SUBTOTAL 5 32,289.75
GASTOS GENERALES DE OPERACIÓN DE OFICINA EN OBRA
Proyecto: Almacén y Planta de Producción
Propietario: RESINPLAST
SUBTOTAL 7 53,547.87
6.00 CIERRES DE OBRA
SUBTOTAL 8 9,500.00