Está en la página 1de 1

C' D'

6.00
5.85
2.85 3.00
.80 .80 .80
2.84m 3.00m

.15

.15
C-1 VAC-1 C-1 VAC-1 C-1

.80

.80

.80
.75
.10
.15 1.15 .10 1.45 .15 2.85 .15

VAC-1
PATIO
2.80
2.80m

VAC-1

VAC-1
3.00
3.00m

1.80
.80 PROYECTO
.80 .80
HAB. AUXILIAR 2
.15
RECONOCIMIENTO ESTRUCTURAL

.80
C-1
.20

MANZANA D-5 LOTE 22

.80
.80
VAC-1 C-1 C-1
VAC-1

.55
.15 .60 2.10 .15 .90 .15 1.80 .15
URB TORCOROMA III

VAC-1

VAC-1
1.25m

.15
1.90

COCINA
SAN JOSE DE CUCUTA

.55
2.05

VAC-1

NORTE DE SANTANDER
VAC-1 C-1 C-1

VAC-1
HAB. AUXILIAR 1
C O L O M B I A
.40

2.00m

VAC-1
VAC-1
.80
2.50m

2.75
1.20
11.70

B B'
.80
COMEDOR HAB. PPAL. OBSERVACIONES :

.80
C-1
.50

VAC-1
NOTA VALIDA PARA TODOS LOS PLANOS ESTRUCTURALES:

.80
VAC-1 C-1 VAC-1

.80
.15
.80

VAC-1
-SEGUIR RECOMENDACIONES DEL ESTUDIO DE SUELOS.
15.00

1.15

1.15m
4.60

VIGA DE AMARRE (N - 0.30)


.20m x .25m -ANTES DE INICIAR LA CONSTRUCCION, SE DEBERAN

VAC-1

.80
.80
VAC-1 C-1 VAC-1 C-1

ESPACIO PARA EL VERIFICAR LAS COTAS CON LOS PLANOS ARQUITECTONICOS.

.25
.15 2.70 .15 2.85 .15
RELLENO VIGA DE AMARRE (N - 0.30) -NO REALIZAR CAMBIOS SIN CONSULTAR A LOS
SALA HAB. PPAL.
.20m x .25m DISEÑADORES DE LA ESTRUCTURA.

VAC-1
1.80

.80 1.80m
-SEGUIR TODAS LAS RECOMENDACIONES DE CONSTRUCCION
CONTENIDAS EN LA NORMA SISMO RESISTENTE (NSR-10).
4.55

MALLA ELECTROSOLDADA

.80

VAC-1
C-1
COMO REFUERZO DE
.15

VAC-1
-EL PROYECTO REQUIERE SUPERVISION TECNICA DE
TEMPERATURA ACUERDO CON EL TITULO I DE LA NORMA SISMO
A A' RESISTENTE (NSR-10).

VAC-1
2.00

2.00m
.80 .80 -EL REFUERZO DEBE ESTAR LIMPIO Y LIBRE DE GRASA U
OTROS PRODUCTOS QUE PUEDAN ALTERAR LA ADHERENCIA
CON EL CONCRETO O MORTERO.
RECUBRIMIENTO

.80
.80
C-1 C-1
-DURANTE LA CONSTRUCCION, SE REQUIEREN ENSAYOS DE
.15

VAC-1
ESPESOR DE 0.07 mts.
VERIFICACION PROPIEDADES DE LOS MATERIALES A USAR.
5.00

6.00

INGENIERO CALCULISTA:
PORCHE

PLANTA DE CIMENTACIÓN (N- 1.10)


3.00

0.07
VIGA DE AMARRE
ESC.: 1-----75 .20m x .25m ING. MARTIN RICARDO ALARCON SARMIENTO

0.25
M.P. No. 54202-273309 NTS

C D
PEDESTAL EN CONCRETO DETALLE PLACA DE PISO
REFORZADO DIBUJO:
2.00

ZAPATA Df=0.90m MICHAEL ANDRES PAEZ PORRAS


ANDEN
INGENIERO CIVIL

ESCALA:
LAS INDICADAS
PLANTA PRIMER NIVEL (N+ 0.00) E # 3 @ .12m.
FECHA :
ESC.: 1-----75 AGOSTO 2022

ESPECIFICACIONES DE LOS MATERIALES:

1 2 3
2.85 3.00
CONCRETO
A B C F G I CIMIENTOS Y VIGAS F'C= 210 KG/CM. 21MPA
DE AMARRE
.20 2.65 .20 2.80 .20
2.00 1.80 3.65 1.25 3.00 Detalle Esquina CIMIENTOS
Viga de CIMENTACION F'C= 210 KG/CM. 21MPA
.70 VIGAS DE CUBIERTA
2 #4 L=5.00 2 #4 L=2.20
.20 .20 1.80 .20 1.60 .20 3.45 .20 1.05 .20 2.80 .20
.20 #4
27 E #3 28 E #3
.70
@ .10 m. @ .10 m. 2 #4 L=6.70 .20 ACERO
.20 .20
2 #4 L=6.00
.20 .10 .07 4#4 .12 .10 MALLA ELECTROSOLDADAS FY= 4200 KG/CM 420MPA
.20 18 E #3 16 E #3 35 E #3 11 E #3 28 E #3
2 #4 L=3.20 .70 2 #4 L=3.90 .10 REFUERZO VARILLA Ø>= # 4 FY= 4200 KG/CM 420MPA
.20
@ .10 m. @ .10 m. @ 0.10 m. @ 0.10 m. @ 0.10 m.
.20 .10 REFUERZO VARILLA Ø<= # 3
REFUERZO VARILLA Ø<= # 2
FY= 2400 KG/CM 240MPA
FY= 2400 KG/CM 240MPA
2 #4 L=6.00 2 #4 L=3.20
.70 2 #4 L=5.10 .70 SISTEMA DE RESISTENCIA SISMICA:
VIGA VAC-1 EJES C,D,F,G, I (.20x.25) .25 Grado de capacidad de
PLANTA CIMENTACION VIGA VAC-1 EJES 2 Y 3 (.20x.25) .17 .17 Disipacion de energia = DES
0.30 .22 .22
ZONA DE AMENAZA SISMICA:
ESC.: 1-------75 PLANTA CIMENTACION .12
ALTA
ESC.: 1-------75
E#3 a .12 L=0,78 m
1 2 2 3
3.00 CONTIENE:
2.85
.07 VIGAS DE AMARRE
PLANTA DE CIMENTACIÓN
.20 2.65 .20 .20 2.80 .20 B C F G I 0.15 DETALLE ESTRIBO TÍPICO (.20x.25)
E #3 L=0.78 mts DETALLES DE CIMENTACIÓN y COLUMNAS
1.80 3.65 1.25 3.00
2 #4 L=3.50 # 4 S1 => E #3 @ 0.075
2 #4 L=3.40 .20 .20 S2 => E #3 @ 0.15 DETALLE DE ZAPATAS AISLADAS
S3 => E #3 @ 0.10
.20 .20 28 E #3
.20 1.60 .20 3.45 .20 1.05 .20 2.80 .20
27 E #3
@ .10 m.
.20
@ .10 m.
.20 2 #4 L=4.20
.70
2 #4 L=6.70 CUADRO DE ZAPATAS AISLADAS
.20 .20 .20
2 #4 L=3.40 .20
2 #4 L=3.50 16 E #3 35 E #3 11 E #3 28 E #3 DIMENSIONES REFUERZO
TIPO CANT.
@ .10 m. @ 0.10 m. @ 0.10 m. @ 0.10 m. Lc Ll H SENTIDO Lc SENTIDO Ll
.20
.20 .15 .15 .15 .15
5 #4 c./0.15 L= 1.00 5 #4 c./0.15 L= 1.00 NOMBRE ARCHIVO:
2 #4 L=4.20 2 #4 L=3.20 Z-1 15 .80 .80 0.30
VIGA VAC-1 EJE B (.20x.25) VIGA VAC-1 EJE A (.20x.25) .70 2 #4 L=5.10 .70
.70 .70
ReconocimientoEstructural-NBG.DWG
PLANTA CIMENTACION PLANTA CIMENTACION
VIGA VAC-1 EJE 1 (.20x.25) .80

ESC.: 1-------75 ESC.: 1-------75


PLANTA CIMENTACION CODIGO PROYECTO
TIPO
PLANO
NUMERO
PLANO ESCALA PLANO

CODIGO PLANO
.80
C-1

ESC.: 1-------75
ESTCP E 1/2 IND

También podría gustarte