CALCULO DE UNIDADES DE GASTOS, GASTO PROBABLE, DIAMETRO, VELOCIDAD Y PERDIDAS

TRAMO TUBERIA SUMA DE


GASTOS GASTO Selecionar: DIAMETRO VELOCIDAD PERDIDAS
PIEZA SANITARIA GASTOS "Q" Prob. (3)(6)(9)(12) (Plgs) "V" (m/s) (m/m)
F C Parcial Total
8-13 F 1 9-8 14.25 14.25
F 1 7-8 9.25 9.25
23.50 24.00 1.04 3 1 1/2 0.91 0.03
13-M F 1 8-13 23.50 23.50
1 Freg. 2.00 2.00
1 Mang. 2.00 2.00
27.50 28.00 1.19 6 1 1/2 1.04 0.04
B-C C 1 Ducha 1.50 1.50
1 LM 0.75 0.75
2.25 3.00 0.20 3 3/4 0.70 0.04
C-E C 1 B-C 2.25 2.25
C 1 Freg. 2.00 2.00
4.25 4.00 0.26 3 3/4 0.91 0.06
E-9 C 1 C-E 4.25 4.25
C 1 Batea 2.00 2.00
1 Lavad. 3.00 3.00
9.25 9.00 0.53 6 1 1.05 0.06
IDAS

OBS.
Coeficiente de
TABLA PARA EL CALCULO DE TUBERIAS DE DISTRIBUCION DE AGUAS PARA EDIFICIOS. Rugosidad 140
No Gasto Probable
(Lts/seg)
∅ V (m/s)
J (m/m) ∅ V (m/s)
J (m/m) ∅ V (m/s)
J (m/m) ∅ V (m/s)
J (m/m)
UDG Tabla 37 G.O. (3) Ec.
Willians-Hazen
(6) Ec.
Willians-Hazen (9) Ec. Willians-
Hazen (12) Ec. Willians-
Hazen

3 0.20 3/4 0.70 0.04 1/2 1.58 0.28


4 0.26 3/4 0.91 0.06 1/2 2.05 0.46
5 0.38 1 0.75 0.03 3/4 1.33 0.13
6 0.42 1 0.83 0.04 3/4 1.47 0.15
7 0.46 1 0.91 0.04 3/4 1.61 0.18
8 0.49 1 1/4 0.62 0.02 1 0.97 0.05 3/4 1.72 0.20
9 0.53 1 1/4 0.67 0.02 1 1.05 0.06 3/4 1.86 0.24
10 0.57 1 1/4 0.72 0.02 1 1.12 0.07 3/4 2.00 0.27
12 0.63 1 1/4 0.80 0.03 1 1.24 0.08 3/4 2.21 0.32
14 0.70 1 1/2 0.61 0.01 1 1/4 0.88 0.03 1 1.38 0.10
16 0.76 1 1/2 0.67 0.02 1 1/4 0.96 0.04 1 1.50 0.11
18 0.83 1 1/2 0.73 0.02 1 1/4 1.05 0.04 1 1.64 0.13
20 0.89 1 1/2 0.78 0.02 1 1/4 1.12 0.05 1 1.76 0.15
22 0.96 1 1/2 0.84 0.02 1 1/4 1.21 0.06 1 1.89 0.17
24 1.04 1 1/2 0.91 0.03 1 1/4 1.31 0.07 1 2.05 0.20
26 1.11 1 1/2 0.97 0.03 1 1/4 1.40 0.08 1 2.19 0.23
28 1.19 2 0.59 0.01 1 1/2 1.04 0.04 1 1/4 1.50 0.09 1 2.35 0.26
30 1.26 2 0.62 0.01 1 1/2 1.11 0.04 1 1/4 1.59 0.10 1 2.49 0.29
32 1.31 2 0.65 0.01 1 1/2 1.15 0.04 1 1/4 1.65 0.10
34 1.36 2 0.67 0.01 1 1/2 1.19 0.05 1 1/4 1.72 0.11
36 1.42 2 0.70 0.01 1 1/2 1.25 0.05 1 1/4 1.79 0.12
38 1.46 2 0.72 0.01 1 1/2 1.28 0.05 1 1/4 1.84 0.13
40 1.52 2 0.75 0.01 1 1/2 1.33 0.06 1 1/4 1.92 0.14
42 1.56 2 0.77 0.01 1 1/2 1.37 0.06 1 1/4 1.97 0.14
44 1.63 2 0.80 0.02 1 1/2 1.43 0.06 1 1/4 2.06 0.16
46 1.69 2 0.83 0.02 1 1/2 1.48 0.07 1 1/4 2.13 0.17
48 1.74 2 0.86 0.02 1 1/2 1.53 0.07
50 1.80 2 0.89 0.02 1 1/2 1.58 0.08
LONGIITUD POR CONEXION J x Lt H H (JxL)
GASTO DIAMETRO J unitaria LONGITUD Cota
UNIDADES VELOCIDAD LONGITUD
TRAMOS

PROBABLE Ø ACCESORIOS
DE GASTOS [lts/seg] [pulg]
"V" (m/s) (m/m) REAL (m) CANT L. EQ. Total Leq. TOTAL (mxm) (metros) (metros) de Piso

1 2 3 4 5 6 7 8 9 10 11 12
13-M 28.00 1.19 1 1/2" 1.04 0.04 3.00 Val. Retencion 1 1/2" 1 3.50 3.50
Compuerta 1 1/2" 1 0.27 0.27
Tee RED. 1 1/2" 2 2.75 5.50
0.04 3.00 - - 0.00 9.27 12.27 0.49 10.00 9.51 0.00
8-13 24.00 1.04 1 1/2 0.91 0.03 2.75 Tee RED. 1 1/2" 1 2.75 2.75
0.03 2.75 - - 0.00 2.75 5.50 0.17 9.51 9.34 0.00
7-8 9.00 0.53 1 1.05 0.06 4.10 Red 1" 1 1/2" 1 0.52 0.52
Tee N 1" 1 0.52 0.52
0.06 4.10 - - 0.00 1.04 5.14 0.31 9.34 9.04 0.00
3-7 7.00 0.46 1" 0.91 0.04 3.60 Tee RED. 1" 1 1.77 1.77
0.04 3.60 - - 1 0.00 1.77 5.37 0.21 9.04 8.82 0.00
2-3 4.00 0.26 3/4" 0.91 0.06 2.10 Red 3/4" 1" 1 0.15 0.15
Tee N 3/4" 1 0.40 0.40
0.06 2.10 - - 0.00 0.55 2.65 0.16 8.82 8.66 0.00
9-8 14.00 0.7 1" 1.38 0.10 2.00 Tee RED. 1" 2 1.77 3.54
CODO 90° 1" 2 0.85 1.70
Red 1/2" 1" 1 0.18 0.18
0.10 2.00 - - 1 0.00 5.42 7.42 0.74 9.34 8.60 0.00
E-9 9.00 0.53 1" 1.05 0.06 1.60 Amp. 1" 1/2" 1 0.34 0.34
Tee RED. 1" 2 1.77 3.54
CODO 90° 1" 2 0.85 1.70
0.06 1.60 - - 0.00 5.58 7.18 0.43 8.60 8.17 0.00
C-E 4.00 0.26 3/4" 0.91 0.06 0.50 Red 3/4" 1" 1 0.15 0.15
Tee N 3/4" 1 0.40 0.40
0.06 0.50 - - 0.00 0.55 1.05 0.06 8.17 8.11 0.00
B-C 3.00 0.2 3/4" 0.70 0.04 9.40 CODO 90° 3/4" 1 0.64 0.64
Red 1/2" 3/4" 1 0.18 0.18
0.04 9.40 - - 0.00 0.82 10.22 0.41 8.11 7.70 0.00
A-B 3.00 0.2 3/4" 0.70 0.04 3.20 CODO 90° 3/4" 1 0.64 0.64
Red 1/2" 3/4" 1 0.18 0.18
0.04 3.20 - - 0.00 0.82 4.02 0.16 7.70 7.54 0.00
LONGIITUD POR CONEXION J x Lt H H (JxL)
GASTO DIAMETRO J unitaria LONGITUD Cota
UNIDADES VELOCIDAD LONGITUD
TRAMOS

PROBABLE Ø ACCESORIOS
DE GASTOS [lts/seg] [pulg]
"V" (m/s) (m/m) REAL (m) CANT L. EQ. Total Leq. TOTAL (mxm) (metros) (metros) de Piso

1 2 3 4 5 6 7 8 9 10 11 12
DUCHA 1/2" 1.58 0.28 1.10 Angulo 1/2" 1 2.60 2.60
Tee N 1/2" 1 0.34 0.34
CODO 90° 1/2" 1 0.46 0.46
0.28 1.10 - - 0.00 3.40 4.50 1.26 7.54 6.28 0.00
suma 4.40
Presion
Disponible

9.51

9.34

9.04

8.82

8.66

8.60

8.17

8.11

7.70

7.54
Presion
Disponible

6.28
LONGITUDES EQUIVALENTES EN

DIAMETRO

TEE VALVULA VALVULA (Abierta)

mm Val.
pulg. CODO 90° CODO 45° Tee N Tee RED. Compuerta Paso
Retencion

13 1/2" 0.46 0.20 0.34 1.01 1.25 0.11 4.90


19 3/4" 0.64 0.30 0.40 1.37 1.75 0.15 6.70
25 1" 0.85 0.40 0.52 1.77 2.00 0.16 8.80
31 1 1/4" 1.16 0.55 0.73 2.44 3.00 0.24 11.60
38 1 1/2" 1.34 0.60 0.85 2.75 3.50 0.27 13.70
50 2" 1.68 0.80 1.07 3.66 4.50 0.37 17.70
63 2 1/2" 2.14 0.90 1.31 4.28 5.00 0.43 21.40
75 3" 2.47 1.00 1.56 4.88 6.00 0.52 24.70
100 4" 3.46 1.50 2.14 6.70 8.00 0.74 36.60
150 6" 4.88 2.25 3.36 10.10 12.00 1.07 51.90
200 8" 6.70 3.00 4.30 13.10 15.00 1.40 70.00
ES EQUIVALENTES EN DIVERSOS ACCESORIOS (k - metros)

ULA (Abierta) REDUCCION AMPLIACION

Red Red Red Red Red Red Red Red Red Red Amp. Amp. Amp. Amp.
Angulo
1/2" 3/4" 1" 11/4" 11/2" 2" 21/2" 3" 4" 6" 3/4" 1" 11/4" 11/2"

2.60 0.34 0.34 0.46 0.46


3.66 0.18 0.15 0.40 0.40
4.50 0.18 0.15 0.16 0.85
5.80 0.34 0.24 0.16 0.24
6.70 0.34 0.24 0.52 0.24
8.85 0.34 0.40 0.31 0.40 0.27
10.10 0.46 0.37
12.80 0.46 0.58 0.43
17.70 0.85 0.58 0.73 0.52
26.00 1.16
36.60 1.07
AMPLIACION

Amp. Amp. Amp. Amp. Amp. Amp.


2" 21/2" 3" 4" 6" 8"

0.64
0.52
0.73
0.27 0.85 0.85 1.34
0.37 1.07 1.07
0.43 1.31
0.52
2.14
1.07