Documentos de Académico
Documentos de Profesional
Documentos de Cultura
YA YB
YA YB
X Y
A2
Z B2 D E F
0.82 9.55 0.83
0.82 9.55 0.83
A1
0.57 1.85 6.35 1.85 0.58
0.05 11.10 0.05
B1 C
0.05
0.58
0.58
0.82
MCR-2Y MP-1Y MCR-2Y
0.25
1.40
0.25
Y1 Cuadro de Refuerzo MCR-2Y
1.40
1 : 10
Y1
ITEM ELEMENTOS DE BORDE F'C: 4000psi FY: 60ksi
1.40 1.40
ZC-1Y EBI EBD GEOMETRÍA MURO
1.40 ZC-1Y 1.40 0.05 0.20 0.20 0.05 H 4.55 m
ZAPATA ZC-1Y
REF. LONG 6#6 D 0.80 m
0.05
0.05
REF. TRANSV #6@0.26cm T 0.45 m
ZAPATA ZC-2Y
REF. LONG 6#6 L 2.00 m
0.15
0.15
REF. TRANS 10#6@0.13cm
MCR-2Y
LB 1.85 m
ZAPATA ZC-2Y
tw 0.25 m
4.88
4.87
REF. LONG 10#6
MP-1Y
0.05
0.05
REF. TRANS #6@0.13cm bwi 0.25 m
MP-1Y
bwd 0.25 m
ZC-2Y
ZC-2Y
REF. ALMA MURO
ZC-2Y
ZC-2Y
6.40
REF. VER. VAR.#4@25cm
8.12
8.02
REF. LONG.1: 4VARILLAS #5 REF. LONG.2: 4VARILLAS #5
REF.HOR. VAR.#4@25cm
EST.1 DZC: ESTRIBO CERRADO #3@5cm. EST.2 DZC: ESTRIBO CERRADO #3@5cm.
EST.1 FZC: ESTRIBO CERRADO #3@10cm. EST.2 FZC: ESTRIBO CERRADO #3@10cm. G2 VAR.#3@25cm
G1 DZC: ----- G3 DZC: -----
G1 FZC: ----- G3 FZC: ----- SEPARACION REFUERZO
4 BASTONES #6 @25cm S1 S2 S3
0.15m 0.25m 0.15m
4 BASTONES #6 @25cm
NTT
1.85
ZC-1Y
ZC-1Y ELEMENTO
DE BORDE
Y2
1.40
Y2 MURO DE CONCRETO
1.40
0.90
SEGÚN CASO
H-LB
MCR-1Y MCR-1Y
0.57
0.58
8
STR-03Y
0.05
0.58 1.05 7.95 1.05 0.58
ZAPATA ZC-1Y
REF. LONG 6#6
REF. TRANSV #6@0.26cm
SECTOR XY - NPT + 1.00
1 : 50
H
SECTOR XY - NPT + 1.00 (Malla Inferior)
1 : 50
ALMA DE
MURO
LB
ZONA DE NO TRASLAPE
bwi bwd 8
EST.1 REF.LONG1 G2 REF.LONG2 EST.2
STR-01Y
0.82 9.55 0.83 MURO DE CONCRETO
SEGÚN CASO
0.05 11.10 0.05
tw
NPT
0.05
Y1
D-T
D
1.40 ZC-1Y
ZAPATA ZC-1Y
1.40 Seccion Tipica de MCR DZC
1 : 10
REF. LONG 7#6
REF. TRANSV #6@26cm
T
ITEM ELEMENTOS DE BORDE F'C: 4000psi FY: 60ksi ELEMENTO DE FUNDACIÓN SEGÚN CASO
ZC-2Y
D -
0.05 0.15 0.05 0.25 T 0.45 m
8.12
8.02
LB 1.85 m
0.05
0.40
ZAPATA ZC-2Y 0.20 0.05 L1 1.85 m MEJORAMIENTO DE SUELO SEGÚN NOTAS GENERALES
REF. LONG 5#6
L2 1.05 m
REF. TRANS #6@26cm
0.05
0.20
bw1 0.25 m
REF. TRANS #6@26cm
0.15
REF.TRANSVERSAL,
bw2 0.25 m AMBAS MALLAS
0.15
bw3 0.25 m
0.05
bw4 0.25 m
0.05
B
REF. VER. VAR.#4@25cm ESTRUCTURAL COLUMNA
O MURO SEGÚN CASO
REF.HOR. VAR.#4@25cm
Y2 G2 VAR.#3@25cm
1.40
SEPARACION REFUERZO
REF. LONG.1: 4VARILLAS #5 REF. LONG.1: 8VARILLAS #5 REF. LONG.2: 8VARILLAS #5 REF.LONGITUDINAL,
EST.1 DZC: ESTRIBO CERRADO #3@5cm. EST.1 DZC: ESTRIBO CERRADO #3@5cm. EST.2 DZC: ESTRIBO CERRADO #3@5cm. S1 S2 S3 AMBAS MALLAS
0.05
EST.1 FZC: ESTRIBO CERRADO #3@10cm. EST.1 FZC: ESTRIBO CERRADO #3@8cm. EST.2 FZC: ESTRIBO CERRADO #3@8cm. 0.15m 0.22m 0.15m
G3 DZC: ----- G1 DZC: #4@10cm G4 DZC: #3@5cm
G3 FZC: ----- G1 FZC: #4@10cm G4 FZC: #3@8cm S4 S5 S6
ZAPATA ZC-1Y
G5 DZC: #4@10cm
0.40
REF. LONG 7#6 MEJORAMIENTO DE SUELO SEGÚN NOTAS GENERALES
G5 FZC:#4@10cm 0.08m 0.08m 0.08m
REF. TRANSV #6@26cm
SECTOR XY - NPT + 1.00 (Malla Superior) Cuadro de Refuerzo MCR-1Y DETALLE TIPICO ZAPATA CORRIDA
1 : 50 1 : 10 1 : 20
COMENTARIOS ESPECIALIDAD
PROYECTO: ESCALA: LAMINA:
:
DISEÑO DE REEMPLAZO DEL HOSPITAL PASTOR
JIMENEZ DE JALAPA, NUEVO SEGOVIA - NICARAGUA PROFESIONAL RESPONSABLE:
BIM MANAGER:
ING. ARMANDO UGARTE
REF.VERTICAL #4
VARIABLE
REFUERZO VERTICAL,
VARILLA #4
0.40
MURO DE MAMPSOTERÍA REF.VERTICAL #4@40cm MURO DE MAMPOSTERÍA
SEGÚN CASO REFORZADA SEGÚN CASO
ZAPATA SEGUN CASO REFUERZO VERTICAL, MURO DE MAMPOSTERÍA
VARILLA #4@0.40m SEGUN CASO RELLENAR DE
CONCRETO FLUIDO REF.VERTICAL #4@40cm
DE 2000 psi
0.40
REF.HORIZONTAL #4@ 3HILADAS
VAR.
BLOQUES DE
CONCRETO
0.20
VARIABLE
0.20
0.40 0.40 0.40 0.40 0.40
0.40
ZAPATA CORRIDA
SEGÚN CASO ESCUADRA #3
ISOMETRICO DE MAMPOSTERÍA REFORZADA
REFUERZO VER.#4@40cm
REFUERZO HOR.#4@ ISOMÉTRICO DE REFUERZO EN "T"
0.40
3HILADAS
SIZA HORIZONTAL Y
VERTICAL DE 1 CM
ZAPATA CORRIDA
RELLENAR DE CONCRETO NOTA: COLOCAR 2 REF.# SEGÚN CASO
FLUIDO DE 2000 psi 4 EN LOS EXTREMOS DEL
MURO
VARIABLE
ABERTURA EN MAMPOSTERÍA
REFUERZO VERTICAL #4
ABERTURA
0.40 0.40 0.20
REF.HORIZONTAL #4
ELEMENTO ESTRUCTURAL
VARIABLE
SEGÚN CASO.
REF.VERTICAL #4@40cm ESCUADRA DE REFUERZO #3
REF.HORIZONTAL #4@3
HILADAS BLOQUE "U"
CORDÓN DE RESPALDO DE 30mm 2REF.LONG.#3
CLOSED CELL BACKER ROD MAPEFOAM. ESTRIBOS#2@10cm
PICAR BLOQUE PARA
HACER CUNA A REFUERZO
MURO DE MAMPOSTERÍA
MP-1G
0.40
0.14
BLOQUE "U"
MURO DE ZA 2REF.LONG.#3
0.40
P AT
MAMPOSTERÍA AC O ESTRIBOS#2@10cm
SEGUN CASO OR C AS JUNTA DE 1" DE POLIESTIRENO
RID UN EXPANDIDO DE ALTA
A SE S EG DENSIDAD (13 kg/cm2 ).
GU IDA
NC ORR
AS C
O TA DETALLE DE JUNTA DE MAMPOSTERÍA
A PA
Z
COMENTARIOS ESPECIALIDAD
PROYECTO: ESCALA: LAMINA:
:
DISEÑO DE REEMPLAZO DEL HOSPITAL PASTOR
JIMENEZ DE JALAPA, NUEVO SEGOVIA - NICARAGUA PROFESIONAL RESPONSABLE:
BIM MANAGER:
ING. ARMANDO UGARTE
YA YB
VARIABLE VARIABLE
MURO Ó COLUMNA
9.55 SEGÚN CASO
ESTRIBADO FUERA DE ESTRIBADO FUERA DE ESTRIBADO FUERA DE
ZONA DE CONFINAMIENTO ZONA DE CONFINAMIENTO ZONA DE CONFINAMIENTO
MURO Ó COLUMNA 2 VECES PERALTE DE VIGA ZONA DE EMPALME 2 VECES PERALTE DE VIGA 2 VECES PERALTE DE VIGA
COLUMNA CM-1Y PLACA BASE 3''X3''X5/8'' SEGÚN CASO
MCR-2Y MCR-2Y ASTM A-571 Gr.50
Y1 GROUT DE NIVELACION 0.06 0.18 0.06
PERALTE DE VIGA
SIKAGROUT -202 O SIMILAR
(F'c: 4000psi MIN)
0.13 0.04
0.13 0.04
1/8"
E-70XX
4 PERNOS Ø5/8''
0.04
0.04
F-1554 Gr.55 CON TUERCAS ZONA DE CONFINAMIENTO DE EN LA ZONA DE EMPALME LOS ESTRIBOS DEBEN ZONA DE CONFINAMIENTO DE ZONA DE CONFINAMIENTO DE EN LA ZONA DE EMPALME LOS ESTRIBOS DEBEN
HEXAGONALES ASTM A-194 VIGA, CUYA LONGITUD EQUIVALE ESPACIARSE COMO MÁXIMO A 10 cm. NO SE VIGA, CUYA LONGITUD EQUIVALE VIGA, CUYA LONGITUD EQUIVALE ESPACIARSE COMO MÁXIMO A 10 cm. NO SE
2H Y ARANDELAS ASTM F-436 A DOS VECES EL PERALTE DE PUEDEN TRASLAPAR MAS DEL 50% DE LOS A DOS VECES EL PERALTE DE A DOS VECES EL PERALTE DE PUEDEN TRASLAPAR MAS DEL 50% DE LOS
0.06 0.18 0.06 VIGA. REFUERZOS DE LA VIGA EN LA MISMA ZONA VIGA. VIGA. REFUERZOS DE LA VIGA EN LA MISMA ZONA
6.40
PLACA BASE CM-1Y DETALLE ZONA DE EMPALME EN VIGAS
1 : 10 1 : 25
4 PERNOS Ø5/8''
F-1554 Gr.55 CON TUERCAS 3"
HEXAGONALES ASTM A-194
2H Y ARANDELAS ASTM F-436 COLUMNA CM-1Y
VARIABLE VARIABLE
1/8"
E-70XX
MCR-1Y
MCR-1Y
GROUT DE NIVELACION
SIKAGROUT -202 O SIMILAR MURO Ó COLUMNA
(F'c: 4000psi MIN) PLACA BASE 3''X3''X5/8'' SEGÚN CASO
ESTRIBADO FUERA DE ESTRIBADO FUERA DE ESTRIBADO FUERA DE
ASTM A-571 Gr.50 ZONA DE CONFINAMIENTO ZONA DE CONFINAMIENTO ZONA DE CONFINAMIENTO
0.03
MURO Ó COLUMNA 2 VECES PERALTE DE VIGA ZONA DE EMPALME 2 VECES PERALTE DE VIGA 2 VECES PERALTE DE VIGA
MCR-1Y MCR-1Y Y2
0.17
SEGÚN CASO
0.20
PERALTE DE VIGA
L-3Y
REF. LONG. #3@20cm REF. VERTICAL #3@20cm
AMBAS MALLAS AMBAS MALLAS
1.05 7.95 1.05
0.30
DETALLE DE ZONA DE EMPALME VIGAS
1 : 25
0.06
0.30
0.05
0.60
0.49
0.35
0.45
VAR.
VAR.
JUNTA DE 1" DE VIGA DE CONCRETO
POLIESTIRENO SEGÚN CASO
tw
VIGA VE-1Y VIGA VE-2Y EXPANDIDO DE ALTA
REF. 10VAR#6 REF. 6VAR#5 DENSIDAD (13 kg/cm2 ).
EST. CERRADO #3@15cm EST. CERRADO #3@15cm
F'c: 3000 psi F'c: 3000 psi
Fy: 60 ksi Fy: 60 ksi CORDÓN DE RESPALDO DE 30mm
EBI REF.VER. REF.HOR. EBD
VAR.
SELLADOR DE JUNTAS CLOSED CELL BACKER ROD S1 S2 S3
MAPEFLEX PU45 Ó SIMILAR. 45. G1 G3
MAPEFOAM. 00° 00°
45. ANGULAR DE FIJACIÓN
Seccion VE-1Y Seccion VE-2Y ANGULAR DE FIJACIÓN 3"x3"x3/16"
1 : 10 1 : 10 VIGA DE CONCRETO
15x25cm REF.LONG.4#4 VARILLA PIN #X
3"x3"x3/16" Seccion Tipica de MCR FZC
ESTRIBOS #2@10cm EPOXICADA CON MAPEFIX 1 : 10
VE SF O SÍMILAR
0.25
VIGA DE CONCRETO
15x25cm REF.LONG.4#4
0.05 0.15 0.05
ESTRIBOS #2@10cm PERNOS DE
EXPANSIÓN HILTI ????
0.05
MURO DE MAMPOSTERÍA
REFORZADA SEGÚN
CASO
0.20
0.30
MURO DE MAMPOSTERÍA
REFORZADA SEGÚN
CASO
0.05
0.15 J I H G
0.25
0.15
VIGA VE-3Y
DETALLE DE JUNTA EN VIGA DE CONCRETO X Y
REF. 4VAR#4 A2
Z B2 D E F
EST. CERRADO #3@15cm
F'c: 3000 psi
DETALLE DE FIJACIÓN DE MAMPOSTERÍA EN LOSA DE CONCRETO
Fy: 60 ksi A1
B1
Seccion VE-3Y C
1 : 10
COMENTARIOS ESPECIALIDAD
PROYECTO: ESCALA: LAMINA:
:
DISEÑO DE REEMPLAZO DEL HOSPITAL PASTOR
JIMENEZ DE JALAPA, NUEVO SEGOVIA - NICARAGUA PROFESIONAL RESPONSABLE:
BIM MANAGER:
ING. ARMANDO UGARTE
YA YB
YA YB YA YB
9.55
9.55
9.55
1.85 6.35 1.85
1.85 3.17 3.18 1.85
1.85 6.35 1.85
3 BASTONES #4@10cm
L=1.50m 3 BASTONES #4@10cm
MCR-2Y VE-1Y MCR-2Y L= 2.20m 6 BASTONES #4@10cm
3 BASTONES #4@10cm
MCR-2Y VE-1Y MCR-2Y L= 1m
MCR-2Y VE-1Y MCR-2Y L=2.20m
Y1
Y1 Y1
VE-2Y
VE-2Y
L-1Y L-1Y L-1Y L-1Y
5.12
VE-1Y
VE-1Y
5.12
5.12
VE-1Y
VE-1Y
5.12
VE-1Y
VE-1Y
VE-2Y VE-2Y
VE-2Y VE-2Y
6.40
6.40
6.40
REF. LONG. #4@25cm
10 BASTONES #4@10cm
L= 1.70m 10 BASTONES #4@10cm
VE-2Y
L-1Y L-1Y
VE-2Y
L= 1.70m
L-1Y L-1Y
MCR-1Y
MCR-1Y MCR-1Y
MCR-1Y MCR-1Y
MCR-1Y
1.85
1.85
1.85
1.85
5 BASTONES #4@10cm
L= 1m
Y2
Y2 Y2
MCR-1Y VE-1Y
MCR-1Y
MCR-1Y VE-1Y
MCR-1Y 1.05 REF. LONG. #6@25cm 7.95 1.05 MCR-1Y VE-1Y 6 BASTONES #4@10cm
MCR-1Y
L= 2.20m
L-2Y REF. LONG. #3@20cm
AMBAS MALLAS
L1
SECTOR Y - NTT
L1
+ 7.5 (Malla Superior)
bw1 bw2 1 : 50
REF.LONG1 REF.LONG2
G1 G3 bw2 bw1
EBE REF.LONG2 G2 REF.LONG1
G3 G1
EST.2 EBE
EST.2
bw3
tw1
bw3
tw1
S4
S4
EBD S3 REF.HOR. S2 REF.VER. S1
EST.1
EST.1
REF.HOR.
0.30
REF.HOR.
ESTRIBOS, VER
DESARROLLO DE
VIGA
VIGA DE
ENTREPISO
VE-2X
0.30
0.20
ESTRIBOS, VER
S6
L2
DESARROLLO DE
G5
S6
2 VARILLAS #4 VIGA
L2
VIGA DE
0.
03
ENTREPISO VE-1X
0.20
2 VARILLAS #4
03
0.
0.20
0.
VIGA DE VIGA DE
03
REF.VER.
VIGA
ENTREPISO VE-1X
0.30
0.30
VIGA DE
ESTRIBOS, VER ESTRIBOS, VER
G4
G4
VIGA VIGA
S5
1 : 10
S5
UNION DE VIGA EN ZONA MEDIA UNION ESQUINERA VIGAS Seccion Tipica de MCR DZC (L)
bw4
EBI
1 : 10 1 : 10 1 : 10
bw4
EBI
EST.3
tw2
REF.LONG.3
EST.3
tw2
REF.LONG.3
COMENTARIOS ESPECIALIDAD
PROYECTO: ESCALA: LAMINA:
:
DISEÑO DE REEMPLAZO DEL HOSPITAL PASTOR
JIMENEZ DE JALAPA, NUEVO SEGOVIA - NICARAGUA PROFESIONAL RESPONSABLE:
BIM MANAGER:
ING. ARMANDO UGARTE
YB YA YA YB
0.60
0.60
VC-1Y
3.20
VM-1Y VM-1Y VM-1Y VM-1Y VM-1Y
MCR-1Y MCR-1Y
5.90
0.30 0.20
7.70
7.70
L-3Y
3.70
VE-3Y
2.20
N.P.T 1.00 N.P.T 1.00
0.75
0.75
0.45
0.45
ZC-1Y ZC-1Y
Y1 Y2 Y2 Y1
0.20
0.60
0.60
VC-1Y VC-1Y
CM-1Y
3.60
3.60
CM-1Y
5.90
5.90
MCR-2Y MCR-1Y SECTOY Y - Nivel +3.70 MCR-1Y MCR-2Y
0.60
7.70
0.20
0.20
3.70 L-3Y
L-3Y
2.50
2.50
2.45
N.P.T 1.00 N.P.T 1.00
0.75
0.75
0.45
0.45
ZC-1Y ZC-1Y
COMENTARIOS ESPECIALIDAD
PROYECTO: ESCALA: LAMINA:
:
DISEÑO DE REEMPLAZO DEL HOSPITAL PASTOR
JIMENEZ DE JALAPA, NUEVO SEGOVIA - NICARAGUA PROFESIONAL RESPONSABLE:
BIM MANAGER:
ING. ARMANDO UGARTE