Documentos de Académico
Documentos de Profesional
Documentos de Cultura
63
humedad 8.64%
merma 0.94%
Resolucion
humedad 261.01
TMSF 2759.99 CUANTO DE MINERAS Au 7764.68
MERMA 25.94 CUANTO DE MINERAS Ag 35925.31
TMSF 2734.04 CUANTO DE MINERAS Cu 39288.18
CUANTO DE MINERAS Zn 1000.11
TOTAL
INGRESOS 11395392.81
EGRESOS 736976.07
RESULTADO NETO 10658416.74
analisis
AS 0.05%
SB 0.28%
BI 0.13%
9876150.78 PENALIDADES
0.00 AS 0.014%
506780.36 SB 0.175%
0.00 BI 0.080%
226071.42
0.00
786390.26 AS 0.037%
SB 0.108%
BI 0.050%
11395392.81
Ag VENDEDOR
COMPRADO
Cu VENDEDOR
COMPRADO
Pb VENDEDOR
COMPRADO
Zn VENDEDOR
COMPRADO
TOTAL
INGRESOS 2051107.73
EGRESOS 736976.07
RESULTADO NETO TOTAL 1314131.66
INTEGRANTE HUARACHA SUCLLI DEYVI ROSSINI
escalador 2
0.76 $ 53.91 $/oz 0.76 $
0.34 $ 19.96 $/lb 0.34 $
0.21 $ 6.04 $/t 0.21 $
0.543 $ 1027 0.543 $
0.10483 286.609595
7.0457 19263.2379
6.775 18523.1328
TOTAL 38072.9802
100% Extra x el excalador
374013.58 172766.383 546779.96
0.00
481441.34 #VALUE! 481441.34
0.00
215374.03 23944.31 239318.34
0.00
762530.55 21037.53 783568.08
2051107.73
COMPRADORMAQUILA 100%
172766.383 698903.09 374013.58 546779.96
#VALUE! 0.00 568277.31 568277.31
23944.31 0.00 215374.03 239318.34
21037.527 0.00 762530.55 783568.08
698903.09 1354375.61
concentrado 3021 TMH Maquila 255.63 $/t
humedad 8.64%
merma 0.94%
Resolucion
humedad 261.01 R.M PRECIO BASE
TMSF 2759.99 CUANTO DE M 7764.68 6937.74 10048.24
MERMA 25.94 CUANTO DE M 35925.31 28470.81 481441.34
TMSF 2734.04 CUANTO DE M 39288.18 35657.95 226071.42
CUANTO DE M 1000.11 742.48 763273.03
escalador 1 escalador 2
1423.54 $/oz 0.76 $ 53.91 $/g 0.76 $
17.8 $/oz 0.34 $ 19.96 $/oz 0.34 $
6.91 $/oz 0.21 $ 6.04 $/oz 0.21 $
1034 $/oz 0.543 $ 1027 0.543 $
45.0485714 $/g
RECIO BASE
$/oz
$/oz
$/lb
$/t
Resolucion
humedad 261.01 R.M
TMSF 2759.99 CUANTO DE MINERAS Au 241508.68 215788.00
MERMA 25.94 CUANTO DE MINERAS Ag 35925.31 28470.81
TMSF 2734.04 CUANTO DE MINERAS Cu 39288.18 35657.95
CUANTO DE MINERAS Zn 1000.11 742.48
TOTAL 35542536.68
INGRESOS 35542536.68
EGRESOS 736976.07
RESULTADO N 34805560.61
0.05%
0.28%
0.13%
PRECIO BASE
34023294.64 S/g
481441.34 $/oz
226071.42 $/lb
763273.03 $/t
TOTAL
INGRESOS 264325591.47
EGRESOS 736976.07
RESULTADO NETO 263588615.40
INTEGRANTES HUARACHA SUCLLI DEYVI ROSSINI
escalador 2
53.91 $/g 0.76 $
19.96 $/lb 0.34 $
6.04 $/t 0.21 $
1027 0.543 $
analisis
AS 0.05%
SB 0.28%
BI 0.13%
xtra x el excalador
262821263.71
0.00
481441.34
0.00
239318.34
0.00
783568.08
264325591.47
OMPRADOR
concentrado 2319.75 TMH Maquila A 397.42 $/t
humedad 10.46% Maquila B 352.28 $/t
merma 0.86%
Resolucion
humedad 242.65
TMSF 2077.10 CUANTO DE MINERAS Au 0.00
MERMA 17.86 CUANTO DE MINERAS Ag 11696.49
TMSF 2059.24 CUANTO DE MINERAS Cu 112908.19
CUANTO DE MINERAS Zn 1050.62
analisis
AS 0.43%
SB 0.35% 0 $/g
BI 0.094%
AS 0.3% 18 37066.339
SB 0.207% 3.88 7992.429
BI 0.042% 6.3 12973.219
TOTAL 58031.99
HUARACHA SUCLLI DEYVI ROSSINI
analisis
AS 0.43%
SB 0.35%
BI 0.094%
12.4200
0.7875
0
practica 1
DATOS
peso humedo(TMH) 100 TON/ZINC
humedad 10%
merma 0.50%
casteristicas
zinc 50% del consentrado
plata 9.0 0nz/ton
arsenico 0.50%
solucion
peso seco(TMS) 90 TON/ZINC
TMS 89.55 TON/ZINC
%de zinc en concetrado 50% 44.775 TON/ZINC contenido metalico de zinc(TMF)
factor de recuperacion del zinc 85%
contenido pagable es 38.05875 TMF
costo de maquila 140 $/ton
costo de maquila total 12537 $/ton TMNS
base acordado en el contrato 900 $/ton
ajuste de maquila por escalonada 100 $/ton
ajuste de maquila por escalonada 10 $/ton
ajuste de maquila por escalonada 895.5 $/ton
concentrado de arsenico
8,835,579
8,791,521
44,058
concentrado 280 TONELADAS humedad 9.86%
merma 0.61%
ag 12.54 0z/to
au 1.5800 gr/tn 0.05079814 OZ/TN
recuperacion metalurgica
RM AG 87%
RM AU 95%
HUMEDAD 130.948956
TMS 1416.91104
MERMA 13.602346
TMNS 1403.3087
MAQUILA 293291.518
RESULTADO 265796.793
R
OZ/TN
GR/TN 0.0755542
VALOR EN MERCADO
621 $/T
14.33 $/T
1721 $/T
MAQUILA 209 $/T
RECUPACION METALUGIAC
307.71596 T 191091.6109 $
13835.4941 OZ 198262.6304 $
98.6252581 OZ 169734.0691 $
559088.3105