Está en la página 1de 2

HOJA DE TRABAJO 1

No. De tamiz abertura (mm) Masa retenida(g) masa acumulada (g) %


4 4.75 0 0 100
6 3.35 30 30 94
10 2 48.7 78.7 84.26
20 0.85 127.3 206 58.8
40 0.425 96.8 302.8 39.44
60 0.25 76.6 379.4 24.12
100 0.15 55.2 434.6 13.08
200 0.075 43.4 478 4.4
fondo 22 500
SUMA: 500

Porcentaje de los finos = 4.4%


Porcentaje de suelo grueso= 95.6%

TABLA 1
120

100

80

60

40

20

0
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5

Series3

D60= (0.425-0.25)/log(39.44)-log(24.12) * log(60)-log(24.12)+0.25

D60= 0.91

D10= (0.15-0.075)/ log(13.08)-log(4.4) * log (10)-log(4.4)+0.075

D10= 0.13

D30= (0.25-0.15)/ log(24.12)-log(13.08) * log (10)-log(13.08)+0.15

D30= 0.29

CU= D30^2 / D60*D10

CU= 0.71

Suelo grueso arena

Cu>6 = 9.1

1<_ Cc <_3 = 0.71 MAL GRADADO


No. De tamiz abertura (mm) Masa retenida(g) masa acumulada (g) %
4 4.75 0 0 100
6 3.35 0 0 100
10 2 0 0 100
20 0.85 9.1 9.1 98.18
40 0.425 249.4 258.5 48.3
60 0.25 179.8 438.3 12.34
100 0.15 22.7 461 7.8
200 0.075 15.5 476.5 4.7
fondo 23.5 500
SUMA: 500

Porcentaje de los finos = 4.7%


Porcentaje de suelo grueso= 95.3%

TABLA 2
120

100

80

60

40

20

0
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5

Series3

D60= 0.66

D10= (0.15-0.075)/ log(7.8)-log(4.7) * log (10)-log(4.7)+0.075

D10= 0.19

D30= (0.25-0.15)/ log(12.34)-log(7.8) * log (10)-log(7.8)+0.15

D30= 0.48

CU= D30^2 / D60*D10

CU= 1.84

Suelo grueso arena

Cu>6 = 6.6

1<_ Cc <_3 = 1.84 BIEN GRADO

También podría gustarte