Está en la página 1de 2

Datos: Anualidad-anticipados-monto-renta

A
n 2
j 0.04
m 2
R
p 4 8
S Q 275,000.00 anualidad factor de anticipacion
y m / p
[ ( 1+ j / m )
- 1 ] - m / p
R = S * *
m * n ( 1+ j / m )
( 1+ j / m )
- 1

2/ 4
[ ( 1+ 0/ 2)
- 1 ] - 2/ 4
R = Q 275,000.00 * *
2* 2 ( 1+ 0.04 / 2)
( 1+ 0/ 2)
- 1

0.5
[ ( 1+ 0.02 )
- 1 ] - 0.5
R = Q 275,000.00 * *
4 ( 1+ 0.02 )
( 1+ 0.02 )
- 1

0.5
[ ( 1.02 )
- 1 ] - 0.5
R = Q 275,000.00 * *
4 ( 1.02 )
( 1.02 )
- 1

[
1.009950494 - 1 ]
R = Q 275,000.00 * * 0.990147543
1.08243216 - 1

0.009950494
R = Q 275,000.00 * * 0.990147543
0.08243216

R = Q 275,000.00 * 0.120711308 * 0.990147543

R = Q 32,868.55
DATOS 2
TASA EQUIVALENTE
j= 0.04
m/p
m= 2 i= (1+j/m) -1
p= 4
i=? i= (1+0.04/2)2/4 -1

i= 0.009950494

FONDO DE AMORTIZACION
1 2 3 4
Deposito Intereses Acumular al Fondo
No. o Renta 0.00995049 Fondo Acumulado
1 32,868.55 0 32,868.55 32,868.55
2 32,868.55 327.06 33,195.61 66,064.16
3 32,868.55 657.37 33,525.92 99,590.08
4 32,868.55 990.97 33,859.52 133,449.61
32,868.55 1,327.89 34,196.44 167,646.05
32,868.55 1,668.16 34,536.71 202,182.76
32,868.55 2,011.82 34,880.37 237,063.13
32,868.55 2,358.90 35,227.45 272,290.57

9,342.16 272,290.57

También podría gustarte