REPORTE DE OBRA

SE REALIZO LEVANTAMIENTO DE ESTRUCTURAS (COLUMNAS) CON LOS SIGUIENTES DATOS:

ELEMENTOS FISICO ELEMENTOS DE PROYECTO

EJES NIVEL DIST. EXT. DIST. INT. DIST. EXT. DIST. INT.

A-B 1 4.35 4.343 4.351 4.35


B-D 7.455 7.46 7.47 7.47
D-G 6.894 7.22 6.892 7.214
G- K 6.891 7.205 6.892 7.214
K-N 6.838 7.152 6.892 7.214
N-Q 6.842 7.162 6.892 7.214
Q-T 6.884 7.2 6.892 7.214
T-W 6.889 7.212 6.892 7.212
W-Y 7.463 7.466 7.470 7.470
Y-Z 4.349 4.345 4.350 4.351

A-B 2 4.353 4.353 4.351 4.350


B-D 7.462 7.46 7.47 7.470
D-G 6.888 7.212 6.892 7.214
G- K 6.883 7.195 6.892 7.214
K-N 6.827 7.155 6.892 7.214
N-Q 6.852 7.166 6.892 7.214
Q-T 6.885 7.205 6.892 7.214
T-W 6.892 7.205 6.892 7.212
W-Y 7.463 7.475 7.470 7.470
Y-Z 4.345 4.345 4.350 4.351
REPORTE DE OBRA

SE REALIZO LEVANTAMIENTO DE ESTRUCTURAS (COLUMNAS) CON LOS SIGUIENTES DATOS:

ELEMENTOS FISICO ELEMENTOS DE PROYECTO

EJES NIVEL DIST. EXT. DIST. INT. DIST. EXT. DIST. INT.

A-B 3 4.357 4.537 4.351 4.35


B-D 7.457 7.459 7.47 7.47
D-G 6.885 7.206 6.892 6.892
G- K 6.881 7.210 6.892 7.214
K-N 6.845 7.160 6.892 7.214
N-Q 6.827 7.145 6.892 7.214
Q-T 6.91 7.228 6.892 7.214
T-W 6.887 7.212 6.892 7.212
W-Y 7.455 7.464 7.470 7.470
Y-Z 4.354 4.34 4.350 4.351

NOTA: SE OBSERVO QUE EN EL EJE "N" MARCA UN MURO QUE MIDE SEGÚN PROYECTO
0.500 CM DE ESPESOR, Y EN FISICO TIENE UNA MEDIDA DE 0.60 CM DE ESPESOR
"SE HIZO DEL CONOCIMIENTO AL ARQ. RAYO"

REPORTE DE OBRA VERTICAL

NIVEL EJE-A EJE-C EJE-G EJE-K EJE- N EJE-Q EJE-T EJE-X EJE-Z
1 10.638 10.635 10.473 10.706 10.624 10.460 10.491 10.686 10.859
2 10.631 10.633 10.463 10.702 10.625 10.456 10.486 10.658 10.848
3 10.639 10.622 10.467 10.700 10.627 10.457 10.496 10.695 10.856
4 10.650 10.646 10.469 10.701 10.638 10.459 10.494 10.687 10.860
5 10.634 10.656 10.478 10.697 10.631 10.445 10.507 10.674 10.849
6 10.634 10.63 10.48 10.698 10.636 10.452 10.486 10.689 10.865
7 10.652 10.639 10.469 10.695 10.635 10.437 10.486 10.702 10.861
8 NO SE OBSERVO
9 NO SE OBSERVO
10 10.639 10.642 10.466 10.705 10.628 10.430 10.477 10.702 10.863
11 10.634 10.634 10.465 10.724 10.614 10.439 10.457 10.69 10.870

10.63 10.652 INDICA DESPLOME MENOR A 0.050 CM


10.46 10.507 INDICA DESPLOME MAYOR A 0.050 CM

NOTA: SE OBSERVARON EN LOS EJES "A Y Z" UN DESPLOME VERTICAL DE 0.040 CM DEL NVIEL 6
AL NIVEL 11
REPORTE FOTOGRAFICO

TRAZO DE MUROS TRAZO DE MUROS

TRAZO DE MUROS TRAZO DE MUROS


CONTROL DE VERTICALIDAD DE OBRA CONTROL DE VERTICALIDAD DE OBRA

CONTROL DE VERTICALIDAD DE OBRA CONTROL DE VERTICALIDAD DE OBRA

También podría gustarte