Data Cantidad Viajes % Promedio


Código/Placa Suma de Volumen (m3) Suma de Viajes 11.24 1.00 11.24
1036 11.24 1.00 5.31 1.00 5.31
3030 5.31 1.00 5.55 1.00 5.55
3094 5.55 1.00 278.00 46.00 6.04
3096 4.92 1.00 5.15 1.00 5.15
14160 5.15 1.00 6.69 1.00 6.69
18390 6.69 1.00 5.97 1.00 5.97
27910 5.97 1.00 140.79 29.00 4.85
30106 159.27 33.00 139.97 31.00 4.52
30113 4.71 1.00 45.46 10.00 4.55
30122 45.46 10.00 107.05 19.00 5.63
30125 107.05 19.00 48.31 13.00 3.72
30133 48.31 13.00 52.69 10.00 5.27
30144 52.69 10.00 90.59 18.00 5.03
30153 90.59 18.00 373.35 77.00 4.85
30164 5.12 1.00 289.34 48.00 6.03
30173 6.09 1.00 208.25 51.00 4.08
30184 208.25 51.00 77.00 16.00 4.81
30193 77.00 16.00 188.85 25.00 7.55
30243 188.85 25.00 708.55 104.00 6.81
30273 7.74 1.00 733.62 104.00 7.05
30274 9.52 1.00 738.38 109.00 6.77
30275 6.96 1.00 14.27 2.00 7.14
30279 14.27 2.00 21.71 5.00 4.34
30291 21.71 5.00 483.40 76.00 6.36
30294 518.47 83.00 7.65 1.00 7.65
30295 7.65 1.00 679.73 100.00 6.8
30296 717.65 106.00 611.37 86.00 7.11
30297 7.56 1.00 231.07 37.00 6.25
30299 275.15 44.00 684.78 108.00 6.34
30300 7.65 1.00 648.33 100.00 6.48
30303 680.70 106.00 94.73 17.00 5.57
30335 94.73 17.00 4.68 1.00 4.68
30345 4.68 1.00 13.69 2.00 6.85
30350 13.69 2.00 865.14 109.00 7.94
30358 894.23 113.00 409.67 61.00 6.72
30360 435.32 65.00 842.05 118.00 7.14
30364 848.99 119.00 677.94 103.00 6.58
30365 711.00 109.00 165.74 27.00 6.14
30373 6.69 1.00 310.17 59.00 5.26
30386 6.63 1.00 5.41 1.00 5.41
30430 5.41 1.00 268.94 51.00 5.27
30438 279.87 53.00 6.85 1.00 6.85
30442 6.85 1.00 572.58 90.00 6.36
30443 591.39 93.00 353.94 60.00 5.9
30445 6.02 1.00 288.81 49.00 5.89
30448 6.23 1.00 60.26 11.00 5.48
30474 60.26 11.00 42.82 10.00 4.28
30483 42.82 10.00 176.38 33.00 5.34
30493 193.00 36.00 7.35 1.00 7.35
30538 7.35 1.00 286.01 46.00 6.22
30562 286.01 46.00 546.91 93.00 5.88
30807 6.45 1.00 108.86 18.00 6.05
30810 108.86 18.00 4.72 1.00 4.72
30814 4.72 1.00 538.06 99.00 5.43
30817 5.99 1.00 4.71 1.00 4.71
(empty) 30.69 22.00 5.12 1.00 5.12
3096 278.00 46.00 6.09 1.00 6.09
8682 6.38 1.00 7.74 1.00 7.74
30113 139.97 31.00 9.52 1.00 9.52
30164 373.35 77.00 6.96 1.00 6.96
30173 294.73 49.00 7.56 1.00 7.56
30273 740.72 109.00 7.65 1.00 7.65
30274 747.31 106.00 6.69 1.00 6.69
30275 765.61 113.00 6.63 1.00 6.63
30297 640.87 90.00 6.02 1.00 6.02
30300 684.78 108.00 6.23 1.00 6.23
30373 165.74 27.00 6.45 1.00 6.45
30386 330.98 63.00 5.99 1.00 5.99
30445 386.80 65.00 4.92 1.00 4.92
30448 321.17 54.00 275.84 117.00 2.36
30807 562.39 96.00
30817 561.04 104.00
Total Result 14,970.98 2,421.00
Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3)
4/4/2022 5760 30300 19,900.00 2,750.00
4/4/2022 5761 30164 11,460.00 2,750.00
4/4/2022 5762 30448 16,780.00 2,750.00
4/4/2022 5763 30303 20,790.00 2,750.00
4/4/2022 5764 30294 17,910.00 2,750.00
4/4/2022 5765 30817 15,230.00 2,750.00
4/4/2022 5766 30364 21,790.00 2,750.00
4/4/2022 5767 30807 17,230.00 2,750.00
4/4/2022 5768 30296 20,450.00 2,750.00
4/4/2022 5769 30275 25,090.00 2,750.00
4/4/2022 5770 30443 18,920.00 2,750.00
4/4/2022 5771 30273 18,470.00 2,750.00
4/4/2022 5772 30360 20,820.00 2,750.00
4/4/2022 5773 30373 17,070.00 2,750.00
4/4/2022 5774 3096 19,140.00 2,750.00
4/4/2022 5775 30358 21,960.00 2,750.00
4/4/2022 5776 30164 13,490.00 2,750.00
4/4/2022 5777 30300 19,970.00 2,750.00
4/4/2022 5778 30448 18,630.00 2,750.00
4/4/2022 5779 30364 22,510.00 2,750.00
4/4/2022 5780 30562 19,270.00 2,750.00
4/4/2022 5781 30817 13,050.00 2,750.00
4/4/2022 5782 30807 14,220.00 2,750.00
4/4/2022 5783 30438 14,150.00 2,750.00
4/4/2022 5784 30275 16,890.00 2,750.00
4/4/2022 5785 30445 17,230.00 2,750.00
4/4/2022 5786 30303 16,430.00 2,750.00
4/4/2022 5787 30294 18,540.00 2,750.00
4/4/2022 5788 30164 15,000.00 2,750.00
4/4/2022 5789 30360 21,660.00 2,750.00
4/4/2022 5790 30443 17,850.00 2,750.00
4/4/2022 5791 30373 14,760.00 2,750.00
4/4/2022 5792 30448 14,210.00 2,750.00
4/4/2022 5793 30273 18,170.00 2,750.00
4/4/2022 5794 30358 18,690.00 2,750.00
4/4/2022 5795 30364 20,890.00 2,750.00
4/4/2022 5796 30807 17,880.00 2,750.00
4/4/2022 5797 30300 16,750.00 2,750.00
4/4/2022 5798 30275 20,650.00 2,750.00
4/4/2022 5799 30296 17,710.00 2,750.00
4/4/2022 5800 30438 15,540.00 2,750.00
4/4/2022 5801 30164 13,350.00 2,750.00
4/4/2022 5802 30562 16,220.00 2,750.00
4/4/2022 5804 30294 25,840.00 2,750.00
4/4/2022 5805 30373 16,890.00 2,750.00
4/4/2022 5806 30448 16,090.00 2,750.00
4/4/2022 5807 30443 17,860.00 2,750.00
4/4/2022 5808 30364 18,100.00 2,750.00
4/4/2022 5809 30303 21,590.00 2,750.00
4/4/2022 5810 30358 20,090.00 2,750.00
4/4/2022 5811 30807 15,890.00 2,750.00
4/4/2022 5812 30273 21,320.00 2,750.00
4/4/2022 5813 30300 19,160.00 2,750.00
4/4/2022 5814 30448 13,920.00 2,750.00
4/4/2022 5815 18390 18,390.00 2,750.00
4/4/2022 5816 30373 15,050.00 2,750.00
4/4/2022 5817 30364 16,150.00 2,750.00
4/4/2022 5818 30443 17,950.00 2,750.00
4/4/2022 5819 30360 19,080.00 2,750.00
4/4/2022 5820 30296 16,770.00 2,750.00
4/4/2022 5821 30438 10,010.00 2,750.00
4/4/2022 5822 30807 16,690.00 2,750.00
4/4/2022 5823 30538 20,200.00 2,750.00
4/4/2022 5824 30164 12,940.00 2,750.00
4/4/2022 5825 30303 16,700.00 2,750.00
4/4/2022 5826 30562 17,140.00 2,750.00
4/4/2022 5827 30275 24,050.00 2,750.00
4/4/2022 5828 30173 16,200.00 2,750.00
4/4/2022 5829 30273 19,680.00 2,750.00
4/4/2022 5830 30373 16,780.00 2,750.00
4/4/2022 5831 30364 22,450.00 2,750.00
4/4/2022 5832 27910 16,420.00 2,750.00
4/4/2022 5833 30360 20,080.00 2,750.00
4/4/2022 5834 30300 17,960.00 2,750.00
4/4/2022 5835 30448 16,240.00 2,750.00
4/4/2022 5836 30443 16,830.00 2,750.00
4/4/2022 5837 30807 14,490.00 2,750.00
4/4/2022 5838 30274 21,150.00 2,750.00
4/4/2022 5839 30817 13,000.00 2,750.00
4/4/2022 5840 30358 19,980.00 2,750.00
4/4/2022 5841 30275 20,060.00 2,750.00
4/4/2022 5842 30296 21,040.00 2,750.00
4/4/2022 5843 30173 17,980.00 2,750.00
4/4/2022 5844 30294 21,250.00 2,750.00
4/4/2022 5845 30303 17,740.00 2,750.00
4/4/2022 5846 30373 10,260.00 2,750.00
4/4/2022 5847 30273 17,820.00 2,750.00
4/4/2022 5848 30364 18,980.00 2,750.00
4/4/2022 5849 30430 14,890.00 2,750.00
4/4/2022 5850 30562 17,320.00 2,750.00
4/4/2022 5851 30443 18,880.00 2,750.00
4/4/2022 5852 30807 15,610.00 2,750.00
4/4/2022 5853 30184 12,350.00 2,750.00
4/4/2022 5854 30274 24,150.00 2,750.00
4/4/2022 5855 30300 19,560.00 2,750.00
4/4/2022 5856 30275 20,490.00 2,750.00
4/4/2022 5857 30360 19,710.00 2,750.00
4/4/2022 5858 30296 22,470.00 2,750.00
4/4/2022 5859 30358 19,350.00 2,750.00
4/4/2022 5860 30184 13,050.00 2,750.00
4/4/2022 5861 30364 19,730.00 2,750.00
4/4/2022 5862 30807 14,070.00 2,750.00
4/4/2022 5863 30562 13,910.00 2,750.00
4/4/2022 5864 30438 11,640.00 2,750.00
4/4/2022 5866 30274 21,610.00 2,750.00
4/4/2022 5867 30275 19,900.00 2,750.00
4/4/2022 5868 30296 17,590.00 2,750.00
4/4/2022 5869 30300 21,870.00 2,750.00
4/4/2022 5870 30443 17,450.00 2,750.00
4/4/2022 5871 30358 20,970.00 2,750.00
4/4/2022 5872 30360 19,900.00 2,750.00
4/4/2022 5873 30817 16,050.00 2,750.00
4/4/2022 5874 30294 18,320.00 2,750.00
4/4/2022 5875 30173 14,970.00 2,750.00
4/5/2022 5876 30364 19610 2,750.00
4/5/2022 5877 30273 18870 2,750.00
4/5/2022 5878 30274 17490 2,750.00
4/5/2022 5880 30294 18200 2,750.00
4/5/2022 5881 30360 19850 2,750.00
4/5/2022 5882 30296 22550 2,750.00
4/5/2022 5883 30807 18820 2,750.00
4/5/2022 5885 30364 22250 2,750.00
4/5/2022 5886 30562 16740 2,750.00
4/5/2022 5887 30360 20620 2,750.00
4/5/2022 5888 30807 17640 2,750.00
4/5/2022 5889 30294 22460 2,750.00
4/5/2022 5890 30275 22260 2,750.00
4/5/2022 5891 30364 22980 2,750.00
4/5/2022 5892 30296 21270 2,750.00
4/5/2022 5893 30360 17970 2,750.00
4/5/2022 5894 30807 15900 2,750.00
4/5/2022 5895 30364 21800 2,750.00
4/5/2022 5897 30562 17910 2,750.00
4/5/2022 5898 30296 19900 2,750.00
4/5/2022 5899 30294 19610 2,750.00
4/5/2022 5900 30358 21960 2,750.00
4/5/2022 5901 30275 19680 2,750.00
4/5/2022 5902 30274 22010 2,750.00
4/5/2022 5903 30364 23380 2,750.00
4/5/2022 5904 30807 16980 2,750.00
4/5/2022 5905 30817 16420 2,750.00
4/5/2022 5906 30360 20820 2,750.00
4/5/2022 5907 30358 21350 2,750.00
4/5/2022 5908 30562 17970 2,750.00
4/5/2022 5909 30274 20490 2,750.00
4/5/2022 5910 30364 23790 2,750.00
4/5/2022 5911 30807 19420 2,750.00
4/5/2022 5912 30296 21130 2,750.00
4/5/2022 5913 30294 18750 2,750.00
4/5/2022 5914 30275 23070 2,750.00
4/5/2022 5915 30443 20510 2,750.00
4/5/2022 5916 30273 19610 2,750.00
4/5/2022 5917 30817 14350 2,750.00
4/5/2022 5918 30358 20900 2,750.00
4/5/2022 5919 30364 20630 2,750.00
4/5/2022 5920 30274 23470 2,750.00
4/5/2022 5921 30807 19190 2,750.00
4/5/2022 5922 30443 19860 2,750.00
4/5/2022 5923 30562 19300 2,750.00
4/5/2022 5924 30296 19790 2,750.00
4/5/2022 5925 30817 15490 2,750.00
4/5/2022 5926 30438 15990 2,750.00
4/5/2022 5927 30294 22550 2,750.00
4/5/2022 5928 30275 19570 2,750.00
4/5/2022 5929 30364 25710 2,750.00
4/5/2022 5930 30358 25130 2,750.00
4/5/2022 5931 30274 26570 2,750.00
4/5/2022 5932 30807 2,750.00
4/5/2022 5933 30273 21720 2,750.00
4/5/2022 5934 30443 19960 2,750.00
4/5/2022 5935 30164 15620 2,750.00
4/5/2022 5936 30358 25960 2,750.00
4/5/2022 5937 30807 19180 2,750.00
4/5/2022 5938 30817 14340 2,750.00
4/5/2022 5939 30438 15720 2,750.00
4/5/2022 5940 30364 23870 2,750.00
4/5/2022 5941 30296 19120 2,750.00
4/5/2022 5942 30274 22510 2,750.00
4/5/2022 5943 30562 16390 2,750.00
4/5/2022 5944 30275 20690 2,750.00
4/6/2022 5946 30303 21690 2,750.00
4/6/2022 5947 30817 18830 2,750.00
4/6/2022 5948 30364 24010 2,750.00
4/6/2022 5949 30273 19330 2,750.00
4/6/2022 5950 30365 23110 2,750.00
4/6/2022 5951 30294 20930 2,750.00
4/6/2022 5952 30164 13420 2,750.00
4/6/2022 5953 30807 18090 2,750.00
4/6/2022 5954 30184 12720 2,750.00
4/6/2022 5955 30274 23000 2,750.00
4/6/2022 5956 30275 23330 2,750.00
4/6/2022 5957 30443 20110 2,750.00
4/6/2022 5958 30358 2,750.00
4/6/2022 5959 30562 2,750.00
4/6/2022 5960 30817 2,750.00
4/6/2022 5961 30364 2,750.00
4/6/2022 5962 30807 2,750.00
4/6/2022 5963 30300 2,750.00
4/6/2022 5964 30303 2,750.00
4/6/2022 5965 30164 2,750.00
4/6/2022 5966 30274 2,750.00
4/6/2022 5967 30443 2,750.00
4/6/2022 5968 30294 2,750.00
4/6/2022 5969 30275 2,750.00
4/6/2022 5970 30296 2,750.00
4/6/2022 5971 30364 2,750.00
4/6/2022 5972 30164 2,750.00
4/6/2022 5973 30807 2,750.00
4/6/2022 5974 30817 2,750.00
4/6/2022 5975 30273 2,750.00
4/6/2022 5976 30562 2,750.00
4/6/2022 5977 30274 2,750.00
4/6/2022 5978 30164 2,750.00
4/6/2022 5979 30296 2,750.00
4/6/2022 5980 30294 2,750.00
4/6/2022 5981 30358 2,750.00
4/6/2022 5982 30364 2,750.00
4/6/2022 5983 30275 2,750.00
4/6/2022 5984 30807 2,750.00
4/6/2022 5985 30817 2,750.00
4/6/2022 5986 30303 19960 2,750.00
4/6/2022 5987 30300 19460 2,750.00
4/6/2022 5988 30273 2,750.00
4/6/2022 5989 30184 13230 2,750.00
4/6/2022 5990 30365 2,750.00
4/6/2022 5991 30296 2,750.00
4/6/2022 5992 30275 2,750.00
4/6/2022 5993 30294 21800 2,750.00
4/6/2022 5994 30164 2,750.00
4/6/2022 5995 30364 2,750.00
4/6/2022 5996 30807 2,750.00
4/6/2022 5997 30445 2,750.00
4/6/2022 5998 30817 2,750.00
4/6/2022 5999 30273 2,750.00
4/6/2022 6000 30300 19990 2,750.00
4/6/2022 6001 30164 2,750.00
4/6/2022 6002 30364 2,750.00
4/6/2022 6003 30303 17700.00 2,750.00
4/6/2022 6004 30814 2,750.00
4/6/2022 6006 30817 2,750.00
4/6/2022 6007 30562 2,750.00
4/6/2022 6008 30365 2,750.00
4/6/2022 6009 30275 2,750.00
4/6/2022 6010 30294 18450 2,750.00
4/6/2022 6011 30445 2,750.00
4/6/2022 6012 30364 2,750.00
4/6/2022 6013 30296 2,750.00
4/6/2022 6014 30300 2,750.00
4/6/2022 6015 30273 18390 2,750.00
4/6/2022 6016 30807 2,750.00
4/6/2022 6017 30358 20710 2,750.00
4/6/2022 6018 30275 2,750.00
4/6/2022 6019 30365 18460 2,750.00
4/6/2022 6020 30164 13660 2,750.00
4/6/2022 6021 30562 19220 2,750.00
4/6/2022 6022 30817 2,750.00
4/6/2022 6023 30373 15200 2,750.00
4/6/2022 6024 30364 2,750.00
4/6/2022 6025 30807 19030 2,750.00
4/6/2022 6026 30184 2,750.00
4/6/2022 6027 30294 19620 2,750.00
4/6/2022 6028 30358 22530 2,750.00
4/6/2022 6029 30303 16390 2,750.00
4/6/2022 6030 30365 21060 2,750.00
4/6/2022 6031 30443 19330 2,750.00
4/6/2022 6032 30164 12520 2,750.00
4/6/2022 6033 30300 17280 2,750.00
4/6/2022 6034 30275 16650 2,750.00
4/6/2022 6035 30273 18240 2,750.00
4/6/2022 6036 30296 19140 2,750.00
4/7/2022 6037 30164 14,800.00 2,750.00
4/7/2022 6038 30817 15,560.00 2,750.00
4/7/2022 6039 30448 18,540.00 2,750.00
4/7/2022 6040 30303 15,930.00 2,750.00
4/7/2022 6041 30300 19,700.00 2,750.00
4/7/2022 6042 30807 19,350.00 2,750.00
4/7/2022 6043 30184 15,300.00 2,750.00
4/7/2022 6044 30294 21,620.00 2,750.00
4/7/2022 6045 30275 23,330.00 2,750.00
4/7/2022 6046 30443 20,210.00 2,750.00
4/7/2022 6047 30373 19,930.00 2,750.00
4/7/2022 6048 30296 19,390.00 2,750.00
4/7/2022 6049 30274 21,610.00 2,750.00
4/7/2022 6050 30562 15,770.00 2,750.00
4/7/2022 6051 30164 14,690.00 2,750.00
4/7/2022 6052 3096 16,250.00 2,750.00
4/7/2022 6053 30358 24,150.00 2,750.00
4/7/2022 6054 30817 17,320.00 2,750.00
4/7/2022 6055 30365 22,510.00 2,750.00
4/7/2022 6056 30807 21,800.00 2,750.00
4/7/2022 6057 30448 15,720.00 2,750.00
4/7/2022 6058 30273 21,510.00 2,750.00
4/7/2022 6059 30303 18,570.00 2,750.00
4/7/2022 6060 30445 18,750.00 2,750.00
4/7/2022 6061 30184 13,210.00 2,750.00
4/7/2022 6062 30443 16,530.00 2,750.00
4/7/2022 6063 30373 16,270.00 2,750.00
4/7/2022 6064 30274 21,100.00 2,750.00
4/7/2022 6065 30300 20,010.00 2,750.00
4/7/2022 6066 30275 20,530.00 2,750.00
4/7/2022 6067 30164 13,160.00 2,750.00
4/7/2022 6068 30173 17,220.00 2,750.00
4/7/2022 6069 30364 18,020.00 2,750.00
4/7/2022 6070 30296 20,740.00 2,750.00
4/7/2022 6071 30274 20,170.00 2,750.00
4/7/2022 6072 30358 21,400.00 2,750.00
4/7/2022 6073 3096 17,480.00 2,750.00
4/7/2022 6074 30438 14,170.00 2,750.00
4/7/2022 6075 30562 17,950.00 2,750.00
4/7/2022 6076 30807 19,110.00 2,750.00
4/7/2022 6077 30817 18,500.00 2,750.00
4/7/2022 6078 30445 18,710.00 2,750.00
4/7/2022 6079 30365 20,250.00 2,750.00
4/7/2022 6080 30273 22,740.00 2,750.00
4/7/2022 6081 30184 10,570.00 2,750.00
4/7/2022 6082 30443 19,990.00 2,750.00
4/7/2022 6083 30373 18,510.00 2,750.00
4/7/2022 6084 30303 20,440.00 2,750.00
4/7/2022 6085 30300 19,340.00 2,750.00
4/7/2022 6086 30164 13,330.00 2,750.00
4/7/2022 6087 30274 22,640.00 2,750.00
4/7/2022 6088 30173 19,140.00 2,750.00
4/7/2022 6089 30364 23,560.00 2,750.00
4/7/2022 6090 3096 16,550.00 2,750.00
4/7/2022 6091 30296 18,340.00 2,750.00
4/7/2022 6092 30275 20,190.00 2,750.00
4/7/2022 6093 30358 25,060.00 2,750.00
4/7/2022 6094 30294 20,470.00 2,750.00
4/7/2022 6095 30438 16,930.00 2,750.00
4/7/2022 6096 30184 2,860.00 2,750.00
4/7/2022 6097 30373 20,310.00 2,750.00
4/7/2022 6098 30817 17,640.00 2,750.00
4/7/2022 6099 30807 18,750.00 2,750.00
4/7/2022 6100 30273 21,340.00 2,750.00
4/7/2022 6101 30443 19,010.00 2,750.00
4/7/2022 6102 30297 23,780.00 2,750.00
4/7/2022 6103 30445 19,130.00 2,750.00
4/7/2022 6104 30365 25,800.00 2,750.00
4/7/2022 6105 30274 24,400.00 2,750.00
4/7/2022 6106 30164 14,230.00 2,750.00
4/7/2022 6107 30303 18,180.00 2,750.00
4/7/2022 6108 30562 16,110.00 2,750.00
4/7/2022 6109 3096 17,090.00 2,750.00
4/7/2022 6110 30364 21,800.00 2,750.00
4/7/2022 6111 30173 15,800.00 2,750.00
4/7/2022 6112 30300 16,480.00 2,750.00
4/7/2022 6113 30358 10,200.00 2,750.00
4/7/2022 6114 30373 16,480.00 2,750.00
4/7/2022 6115 30296 19,540.00 2,750.00
4/7/2022 6116 30275 17,950.00 2,750.00
4/7/2022 6117 30438 14,900.00 2,750.00
4/7/2022 6118 30817 15,440.00 2,750.00
4/7/2022 6119 30807 16,020.00 2,750.00
4/7/2022 6120 30294 18,340.00 2,750.00
4/7/2022 6121 30164 13,310.00 2,750.00
4/7/2022 6122 30243 18,720.00 2,750.00
4/7/2022 6123 30443 19,820.00 2,750.00
4/7/2022 6124 30297 20,680.00 2,750.00
4/7/2022 6125 30303 19,880.00 2,750.00
4/7/2022 6126 30274 18,750.00 2,750.00
4/7/2022 6127 30275 18,600.00 2,750.00
4/7/2022 6128 30445 18,150.00 2,750.00
4/7/2022 6129 30365 22,250.00 2,750.00
4/7/2022 6130 30300 18,860.00 2,750.00
4/7/2022 6131 30296 18,450.00 2,750.00
4/7/2022 6132 30164 13,140.00 2,750.00
4/7/2022 6133 30807 14,280.00 2,750.00
4/7/2022 6134 30817 15,290.00 2,750.00
4/7/2022 6135 30442 18,840.00 2,750.00
4/7/2022 6136 30274 17,730.00 2,750.00
4/7/2022 6137 30303 20,540.00 2,750.00
4/7/2022 6138 30297 23,710.00 2,750.00
4/7/2022 6139 30365 20,530.00 2,750.00
4/7/2022 6140 30184 14,490.00 2,750.00
4/7/2022 6141 30364 19,870.00 2,750.00
4/7/2022 6142 30438 15,220.00 2,750.00
4/7/2022 6143 30164 13,170.00 2,750.00
4/7/2022 6144 30562 18,640.00 2,750.00
4/7/2022 6145 30807 18,270.00 2,750.00
4/7/2022 6146 30173 17,730.00 2,750.00
4/7/2022 6147 30358 22,520.00 2,750.00
4/7/2022 6148 30817 14,730.00 2,750.00
4/7/2022 6149 30300 19,070.00 2,750.00
4/7/2022 6150 30373 16,550.00 2,750.00
4/7/2022 6151 30443 18,380.00 2,750.00
4/7/2022 6152 30303 22,110.00 2,750.00
4/7/2022 6153 30297 21,890.00 2,750.00
4/7/2022 6154 30365 17,400.00 2,750.00
4/7/2022 6155 30294 13,720.00 2,750.00
4/7/2022 6156 3096 28,710.00 2,750.00
4/7/2022 6157 30296 15,470.00 2,750.00
4/7/2022 6158 30275 16,360.00 2,750.00
4/7/2022 6159 30184 13,550.00 2,750.00
4/7/2022 6160 30364 20,000.00 2,750.00
4/7/2022 6161 30438 16,300.00 2,750.00
4/8/2022 6162 30364 21,080.00 2,750.00
4/8/2022 6163 3096 14,250.00 2,750.00
4/8/2022 6164 30303 21,630.00 2,750.00
4/8/2022 6165 30365 17,500.00 2,750.00
4/8/2022 6166 30300 22,740.00 2,750.00
4/8/2022 6167 30817 16,880.00 2,750.00
4/8/2022 6168 30296 19,790.00 2,750.00
4/8/2022 6169 30443 21,100.00 2,750.00
4/8/2022 6170 30184 15,450.00 2,750.00
4/8/2022 6171 30358 23,640.00 2,750.00
4/8/2022 6172 30173 18,510.00 2,750.00
4/8/2022 6173 30274 20,740.00 2,750.00
4/8/2022 6174 30294 18,230.00 2,750.00
4/8/2022 6175 30243 20,570.00 2,750.00
4/8/2022 6176 30275 20,900.00 2,750.00
4/8/2022 6177 30562 16,460.00 2,750.00
4/8/2022 6178 30273 19,180.00 2,750.00
4/8/2022 6179 30365 16,840.00 2,750.00
4/8/2022 6180 30294 19,490.00 2,750.00
4/8/2022 6181 30243 21,050.00 2,750.00
4/8/2022 6182 30562 18,090.00 2,750.00
4/9/2022 6183.00 30817 18400.00 2,750.00
4/9/2022 6184.00 30364 19590.00 2,750.00
4/9/2022 6185.00 30365 24310.00 2,750.00
4/9/2022 6186.00 30300 23510.00 2,750.00
4/9/2022 6187.00 30273 20740.00 2,750.00
4/9/2022 6188.00 30274 21270.00 2,750.00
4/9/2022 6189.00 30358 24810.00 2,750.00
4/9/2022 6190.00 30173 17960.00 2,750.00
4/9/2022 6191.00 3096 20250.00 2,750.00
4/9/2022 6192.00 30296 20400.00 2,750.00
4/9/2022 6193.00 30438 16230.00 2,750.00
4/9/2022 6194.00 30275 19310.00 2,750.00
4/9/2022 6195.00 30297 20590.00 2,750.00
4/9/2022 6196.00 30817 16330.00 2,750.00
4/9/2022 6197.00 30364 23390.00 2,750.00
4/9/2022 6198.00 30243 20310.00 2,750.00
4/9/2022 6199.00 30303 19190.00 2,750.00
4/9/2022 6200.00 30373 19860.00 2,750.00
4/9/2022 6201.00 30274 21910.00 2,750.00
4/9/2022 6202.00 30365 21280.00 2,750.00
4/9/2022 6203.00 30300 20540.00 2,750.00
4/9/2022 6204.00 30562 17070.00 2,750.00
4/9/2022 6205.00 30273 21330.00 2,750.00
4/9/2022 6206.00 30173 17490.00 2,750.00
4/9/2022 6207 30358 21,940.00 2,750.00
4/9/2022 6208 3096 16,720.00 2,750.00
4/9/2022 6209 30297 22,640.00 2,750.00
4/9/2022 6210 30364 23,490.00 2,750.00
4/9/2022 6211 30438 15,850.00 2,750.00
4/9/2022 6212 30373 17,300.00 2,750.00
4/9/2022 6213 30817 16,990.00 2,750.00
4/9/2022 6214 30275 21,780.00 2,750.00
4/9/2022 6215 30303 19,240.00 2,750.00
4/9/2022 6216 30445 23,640.00 2,750.00
4/9/2022 6217 30274 22,190.00 2,750.00
4/9/2022 6218 30296 19,990.00 2,750.00
4/9/2022 6219 30164 14,240.00 2,750.00
4/9/2022 6220 30300 20,150.00 2,750.00
4/9/2022 6221 30365 19,940.00 2,750.00
4/9/2022 6222 30296 13,810.00 2,750.00
4/9/2022 6223 30297 24,610.00 2,750.00
4/9/2022 6224 30358 22,250.00 2,750.00
4/9/2022 6225 30173 18,770.00 2,750.00
4/9/2022 6226 3096 18,160.00 2,750.00
4/9/2022 6227 30817 16,990.00 2,750.00
4/9/2022 6228 30364 24,600.00 2,750.00
4/9/2022 6229 30273 23,990.00 2,750.00
4/9/2022 6230 30373 19,490.00 2,750.00
4/9/2022 6231 30275 21,820.00 2,750.00
4/9/2022 6232 30303 20,490.00 2,750.00
4/9/2022 6233 30438 17,190.00 2,750.00
4/9/2022 6234 30274 22,080.00 2,750.00
4/9/2022 6235 30364 21,850.00 2,750.00
4/9/2022 6236 30817 13,740.00 2,750.00
4/9/2022 6237 30562 17,660.00 2,750.00
4/9/2022 6238 30300 20,450.00 2,750.00
4/9/2022 6239 30296 15,580.00 2,750.00
4/9/2022 6240 30297 20,030.00 2,750.00
4/9/2022 6241 30164 13,540.00 2,750.00
4/9/2022 6242 30358 20,670.00 2,750.00
4/9/2022 6243 30303 22,710.00 2,750.00
4/9/2022 6244 3096 16,300.00 2,750.00
4/9/2022 6245 30365 20,900.00 2,750.00
4/9/2022 6246 30273 18,830.00 2,750.00
4/9/2022 6247 30364 22,980.00 2,750.00
4/9/2022 6248 30274 21,420.00 2,750.00
4/9/2022 6249 30275 17,970.00 2,750.00
4/9/2022 6250 30297 23,420.00 2,750.00
4/9/2022 6251 30164 15,360.00 2,750.00
4/9/2022 6252 30358 23,830.00 2,750.00
4/9/2022 6253 30300 20,990.00 2,750.00
4/9/2022 6254 30296 19,450.00 2,750.00
4/9/2022 6255 30562 16,940.00 2,750.00
4/9/2022 6256 30173 16,820.00 2,750.00
4/9/2022 6257 3096 17,610.00 2,750.00
4/9/2022 6258 30274 22,650.00 2,750.00
4/9/2022 6259 30807 19,680.00 2,750.00
4/9/2022 6260 30438 1,880.00 2,750.00
4/9/2022 6261 30365 28,330.00 2,750.00
4/9/2022 6262 30364 21,870.00 2,750.00
4/9/2022 6263 30273 18,930.00 2,750.00
4/9/2022 6264 30113 15,270.00 2,750.00
4/9/2022 6265 30297 21,750.00 2,750.00
4/9/2022 6266 30817 17,710.00 2,750.00
4/9/2022 6267 30303 16,910.00 2,750.00
4/9/2022 6268 30275 22,620.00 2,750.00
4/9/2022 6269 30164 14,770.00 2,750.00
4/9/2022 6270 30335 14,430.00 2,750.00
4/9/2022 6271 30358 21,860.00 2,750.00
4/9/2022 6272 30173 15,570.00 2,750.00
4/9/2022 6273 30807 17,020.00 2,750.00
4/9/2022 6274 30300 20,400.00 2,750.00
4/9/2022 6275 30562 21,120.00 2,750.00
4/9/2022 6276 30274 20,320.00 2,750.00
4/9/2022 6277 30297 18,840.00 2,750.00
4/9/2022 6278 30113 13,720.00 2,750.00
4/9/2022 6279 30164 13,280.00 2,750.00
4/9/2022 6280 3096 15,780.00 2,750.00
4/9/2022 6281 30373 16,890.00 2,750.00
4/9/2022 6282 30364 21,260.00 2,750.00
4/9/2022 6283 30365 19,890.00 2,750.00
4/9/2022 6284 30273 19,790.00 2,750.00
4/9/2022 6285 30275 18,590.00 2,750.00
4/9/2022 6286 30303 18,000.00 2,750.00
4/9/2022 6287 30296 22,390.00 2,750.00
4/9/2022 6288 30817 15,720.00 2,750.00
4/10/2022 6289 30817 16,470.00 2,750.00
4/10/2022 6290 30807 15,520.00 2,750.00
4/10/2022 6291 30364 18,930.00 2,750.00
4/10/2022 6292 30448 17,050.00 2,750.00
4/10/2022 6293 30303 19,820.00 2,750.00
4/10/2022 6294 30275 21,350.00 2,750.00
4/10/2022 6295 30274 22,970.00 2,750.00
4/10/2022 6296 30297 21,080.00 2,750.00
4/10/2022 6297 30164 15,560.00 2,750.00
4/10/2022 6298 30173 15,180.00 2,750.00
4/10/2022 6299 30373 18,160.00 2,750.00
4/10/2022 6300 30300 21,630.00 2,750.00
4/10/2022 6301 30273 20,400.00 2,750.00
4/10/2022 6302 3096 15,860.00 2,750.00
4/10/2022 6303 30562 19,190.00 2,750.00
4/10/2022 6304 30365 18,280.00 2,750.00
4/10/2022 6305 30817 14,990.00 2,750.00
4/10/2022 6306 30807 17,740.00 2,750.00
4/10/2022 6307 30448 16,950.00 2,750.00
4/10/2022 6308 30243 20,780.00 2,750.00
4/10/2022 6309 30113 13,230.00 2,750.00
4/10/2022 6310 30164 14,820.00 2,750.00
4/10/2022 6311 30296 20,910.00 2,750.00
4/10/2022 6312 30297 20,800.00 2,750.00
4/10/2022 6313 30274 26,180.00 2,750.00
4/10/2022 6314 30373 18,400.00 2,750.00
4/10/2022 6315 30173 16,760.00 2,750.00
4/10/2022 6316 30807 17,730.00 2,750.00
4/10/2022 6317 30445 16,560.00 2,750.00
4/10/2022 6318 30386 18,230.00 2,750.00
4/10/2022 6319 30300 21,030.00 2,750.00
4/10/2022 6320 30448 17,120.00 2,750.00
4/10/2022 6321 30273 21,290.00 2,750.00
4/10/2022 6322 30275 19,130.00 2,750.00
4/10/2022 6323 30164 14,070.00 2,750.00
4/10/2022 6324 3096 13,530.00 2,750.00
4/10/2022 6325 30817 16,470.00 2,750.00
4/10/2022 6326 30113 12,940.00 2,750.00
4/10/2022 6327 30365 18,260.00 2,750.00
4/10/2022 6328 30274 19,550.00 2,750.00
4/10/2022 6329 30297 24,580.00 2,750.00
4/10/2022 6330 30373 19,900.00 2,750.00
4/10/2022 6331 30173 16,580.00 2,750.00
4/10/2022 6332 30807 18,980.00 2,750.00
4/10/2022 6333 30448 21,260.00 2,750.00
4/10/2022 6334 30164 15,070.00 2,750.00
4/10/2022 6335 30303 21,240.00 2,750.00
4/10/2022 6336 30243 19,470.00 2,750.00
4/10/2022 6337 30562 18,150.00 2,750.00
4/10/2022 6338 30273 22,700.00 2,750.00
4/10/2022 6339 30300 15,210.00 2,750.00
4/10/2022 6340 30386 15,590.00 2,750.00
4/10/2022 6341 30275 20,120.00 2,750.00
4/10/2022 6342 30445 16,140.00 2,750.00
4/10/2022 6343 30274 19,990.00 2,750.00
4/10/2022 6344 30448 18,790.00 2,750.00
4/10/2022 6345 30817 16,660.00 2,750.00
4/10/2022 6346 30807 16,010.00 2,750.00
4/10/2022 6347 30173 15,540.00 2,750.00
4/10/2022 6348 30358 23,100.00 2,750.00
4/10/2022 6349 30373 18,360.00 2,750.00
4/10/2022 6350 30365 22,850.00 2,750.00
4/10/2022 6351 30297 24,310.00 2,750.00
4/10/2022 6352 30443 18,870.00 2,750.00
4/10/2022 6353 30164 12,470.00 2,750.00
4/10/2022 6354 30303 22,890.00 2,750.00
4/10/2022 6355 30296 19,480.00 2,750.00
4/10/2022 6356 30243 21,210.00 2,750.00
4/10/2022 6357 30300 19,530.00 2,750.00
4/10/2022 6358 30562 17,110.00 2,750.00
4/10/2022 6359 30386 15,100.00 2,750.00
4/10/2022 6360 30807 15,370.00 2,750.00
4/10/2022 6361 30273 21,700.00 2,750.00
4/10/2022 6362 30275 20,940.00 2,750.00
4/10/2022 6363 30274 21,950.00 2,750.00
4/10/2022 6364 30817 15,620.00 2,750.00
4/10/2022 6365 30445 16,980.00 2,750.00
4/10/2022 6366 30358 23,150.00 2,750.00
4/10/2022 6367 30297 18,390.00 2,750.00
4/10/2022 6368 30365 22,000.00 2,750.00
4/11/2022 6369 30300 19,510.00 2,750.00
4/11/2022 6370 30273 16,220.00 2,750.00
4/11/2022 6371 30448 17,560.00 2,750.00
4/11/2022 6372 30303 17,760.00 2,750.00
4/11/2022 6373 30365 16,530.00 2,750.00
4/11/2022 6374 30296 18,560.00 2,750.00
4/11/2022 6375 30358 22,300.00 2,750.00
4/11/2022 6376 30173 17,400.00 2,750.00
4/11/2022 6377 30817 16,520.00 2,750.00
4/11/2022 6378 30807 16,910.00 2,750.00
4/11/2022 6379 30274 20,460.00 2,750.00
4/11/2022 6380 30297 21,880.00 2,750.00
4/11/2022 6381 30275 16,520.00 2,750.00
4/11/2022 6382 30445 17,260.00 2,750.00
4/11/2022 6383 30438 16,030.00 2,750.00
4/11/2022 6384 30448 18,510.00 2,750.00
4/11/2022 6385 30243 20,350.00 2,750.00
4/11/2022 6386 30300 18,360.00 2,750.00
4/11/2022 6387 30386 15,570.00 2,750.00
4/11/2022 6388 30303 20,270.00 2,750.00
4/11/2022 6389 30273 19,630.00 2,750.00
4/11/2022 6390 30294 17,600.00 2,750.00
4/11/2022 6391 30365 18,630.00 2,750.00
4/11/2022 6392 30358 19,750.00 2,750.00
4/11/2022 6393 30274 20,560.00 2,750.00
4/11/2022 6394 30275 18,230.00 2,750.00
4/11/2022 6395 30296 19,710.00 2,750.00
4/11/2022 6396 30445 18,720.00 2,750.00
4/11/2022 6397 30297 22,500.00 2,750.00
4/11/2022 6398 30243 23,260.00 2,750.00
4/11/2022 6399 30386 4,600.00 2,750.00
4/11/2022 6400 30274 19,830.00 2,750.00
4/11/2022 6401 30303 18,750.00 2,750.00
4/11/2022 6402 30300 19,130.00 2,750.00
4/11/2022 6403 30273 17,170.00 2,750.00
4/11/2022 6404 30273 19,420.00 2,750.00
4/11/2022 6405 30294 20,270.00 2,750.00
4/11/2022 6406 30296 20,810.00 2,750.00
4/11/2022 6407 30358 20,810.00 2,750.00
4/11/2022 6408 30445 17,590.00 2,750.00
4/11/2022 6409 30275 18,780.00 2,750.00
4/11/2022 6410 30297 20,450.00 2,750.00
4/11/2022 6411 30243 23,310.00 2,750.00
4/11/2022 6412 30303 20,160.00 2,750.00
4/11/2022 6413 30294 20,980.00 2,750.00
4/11/2022 6414 30274 20,680.00 2,750.00
4/11/2022 6415 30164 13,950.00 2,750.00
4/11/2022 6416 30443 19,660.00 2,750.00
4/11/2022 6417 30273 20,630.00 2,750.00
4/11/2022 6418 30296 20,270.00 2,750.00
4/11/2022 6419 30807 17,750.00 2,750.00
4/11/2022 6420 30358 23,820.00 2,750.00
4/11/2022 6421 30365 21,780.00 2,750.00
4/11/2022 6422 30275 18,630.00 2,750.00
4/11/2022 6423 30445 17,790.00 2,750.00
4/11/2022 6424 30297 21,880.00 2,750.00
4/11/2022 6425 30438 13,290.00 2,750.00
4/11/2022 6426 30817 17,670.00 2,750.00
4/11/2022 6427 30274 24,380.00 2,750.00
4/11/2022 6428 30173 13,020.00 2,750.00
4/11/2022 6429 30807 18,250.00 2,750.00
4/11/2022 6430 30443 19,610.00 2,750.00
4/11/2022 6431 30810 14,890.00 2,750.00
4/11/2022 6432 30243 19,220.00 2,750.00
4/11/2022 6433 30164 14,610.00 2,750.00
4/11/2022 6434 3030 14,610.00 2,750.00
4/11/2022 6435 30386 16,860.00 2,750.00
4/11/2022 6436 30273 19,540.00 2,750.00
4/11/2022 6437 30358 19,720.00 2,750.00
4/11/2022 6438 30297 22,020.00 2,750.00
4/11/2022 6439 30275 23,200.00 2,750.00
4/11/2022 6440 30296 18,670.00 2,750.00
4/11/2022 6441 30365 19,890.00 2,750.00
4/11/2022 6442 30193 17,510.00 2,750.00
4/11/2022 6443 30303 1,960.00 2,750.00
4/11/2022 6444 30294 22,160.00 2,750.00
4/11/2022 6445 30443 16,980.00 2,750.00
4/11/2022 6446 30173 18,500.00 2,750.00
4/11/2022 6447 30297 23,350.00 2,750.00
4/11/2022 6448 30807 16,920.00 2,750.00
4/11/2022 6449 30810 16,740.00 2,750.00
4/11/2022 6450 3096 20,140.00 2,750.00
4/11/2022 6451 30438 14,920.00 2,750.00
4/11/2022 6452 30300 21,080.00 2,750.00
4/11/2022 6453 30274 21,100.00 2,750.00
4/11/2022 6454 30273 20,850.00 2,750.00
4/11/2022 6455 30243 23,200.00 2,750.00
4/11/2022 6456 30358 25,990.00 2,750.00
4/11/2022 6457 30297 23,350.00 2,750.00
4/11/2022 6458 30164 17,010.00 2,750.00
4/11/2022 6459 30365 16,510.00 2,750.00
4/11/2022 6460 30386 16,700.00 2,750.00
4/11/2022 6461 30193 16,790.00 2,750.00
4/11/2022 6462 30562 18,720.00 2,750.00
4/11/2022 6463 30443 20,150.00 2,750.00
4/19/2022 6464 30358 24,800.00 2,750.00
4/19/2022 6465 30364 21,850.00 2,750.00
4/19/2022 6466 30807 16,040.00 2,750.00
4/19/2022 6467 30445 16,740.00 2,750.00
4/19/2022 6468 30817 18,900.00 2,750.00
4/19/2022 6469 30443 20,630.00 2,750.00
4/19/2022 6470 30303 21,480.00 2,750.00
4/19/2022 6471 30300 21,190.00 2,750.00
4/19/2022 6472 30365 19,370.00 2,750.00
4/19/2022 6473 30173 17,580.00 2,750.00
4/19/2022 6474 30438 15,750.00 2,750.00
4/19/2022 6475 30386 17,180.00 2,750.00
4/19/2022 6476 30164 15,410.00 2,750.00
4/19/2022 6477 30296 20,680.00 2,750.00
4/19/2022 6478 30275 20,790.00 2,750.00
4/19/2022 6479 30184 14,600.00 2,750.00
4/19/2022 6480 30364 23,580.00 2,750.00
4/19/2022 6481 30562 17,970.00 2,750.00
4/19/2022 6482 30358 25,070.00 2,750.00
4/19/2022 6483 30445 19,040.00 2,750.00
4/19/2022 6484 30817 17,620.00 2,750.00
4/19/2022 6485 30443 22,450.00 2,750.00
4/19/2022 6486 30274 23,510.00 2,750.00
4/19/2022 6487 30807 21,980.00 2,750.00
4/19/2022 6488 30303 21,820.00 2,750.00
4/19/2022 6489 30386 16,890.00 2,750.00
4/19/2022 6490 30300 20,740.00 2,750.00
4/19/2022 6491 30365 18,910.00 2,750.00
4/19/2022 6492 30173 17,360.00 2,750.00
4/19/2022 6493 30164 13,080.00 2,750.00
4/19/2022 6494 30438 13,700.00 2,750.00
4/19/2022 6495 30184 11,140.00 2,750.00
4/19/2022 6496 30364 23,950.00 2,750.00
4/19/2022 6497 30296 24,030.00 2,750.00
4/19/2022 6498 30358 21,650.00 2,750.00
4/19/2022 6499 30817 19,370.00 2,750.00
4/19/2022 6500 30807 19,920.00 2,750.00
4/19/2022 6501 30275 19,240.00 2,750.00
4/19/2022 6502 30273 21,760.00 2,750.00
4/19/2022 6503 30274 21,210.00 2,750.00
4/19/2022 6504 30443 21,010.00 2,750.00
4/19/2022 6505 30445 16,120.00 2,750.00
4/19/2022 6506 30164 14,650.00 2,750.00
4/19/2022 6507 30562 19,570.00 2,750.00
4/19/2022 6508 30173 17,420.00 2,750.00
4/19/2022 6509 30184 11,410.00 2,750.00
4/19/2022 6510 30300 18,460.00 2,750.00
4/19/2022 6511 30364 24,210.00 2,750.00
4/19/2022 6512 30296 22,480.00 2,750.00
4/19/2022 6513 30807 20,670.00 2,750.00
4/19/2022 6514 30386 17,830.00 2,750.00
4/19/2022 6515 30365 19,030.00 2,750.00
4/19/2022 6516 30303 15,700.00 2,750.00
4/19/2022 6517 30358 21,210.00 2,750.00
4/19/2022 6518 30443 19,650.00 2,750.00
4/19/2022 6519 30817 17,830.00 2,750.00
4/19/2022 6520 30274 19,790.00 2,750.00
4/19/2022 6521 30164 11,270.00 2,750.00
4/19/2022 6522 30364 16,150.00 2,750.00
4/19/2022 6523 30807 16,170.00 2,750.00
4/19/2022 6524 30173 13,090.00 2,750.00
4/19/2022 6525 30448 15,460.00 2,750.00
4/19/2022 6526 30296 18,920.00 2,750.00
4/19/2022 6527 30358 21,730.00 2,750.00
4/19/2022 6528 30300 16,890.00 2,750.00
4/19/2022 6529 30365 18,050.00 2,750.00
4/19/2022 6530 30386 14,470.00 2,750.00
4/19/2022 6531 30817 13,120.00 2,750.00
4/19/2022 6532 30274 19,920.00 2,750.00
4/19/2022 6533 30443 17,680.00 2,750.00
4/19/2022 6534 30303 18,390.00 2,750.00
4/19/2022 6535 30807 16,880.00 2,750.00
4/19/2022 6536 30273 20,160.00 2,750.00
4/19/2022 6537 30364 22,090.00 2,750.00
4/19/2022 6538 30297 22,350.00 2,750.00
4/19/2022 6539 30173 16,830.00 2,750.00
4/19/2022 6540 30445 14,210.00 2,750.00
4/19/2022 6541 30164 11,560.00 2,750.00
4/19/2022 6542 30358 21,940.00 2,750.00
4/19/2022 6543 30365 19,210.00 2,750.00
4/19/2022 6544 30296 18,040.00 2,750.00
4/19/2022 6545 30300 18,770.00 2,750.00
4/19/2022 6546 30275 20,630.00 2,750.00
4/19/2022 6547 30274 15,240.00 2,750.00
4/19/2022 6548 30807 18,000.00 2,750.00
4/19/2022 6549 30443 18,340.00 2,750.00
4/19/2022 6550 30386 16,810.00 2,750.00
4/19/2022 6551 30303 16,600.00 2,750.00
4/19/2022 6552 30184 12,940.00 2,750.00
4/19/2022 6553 30448 19,080.00 2,750.00
4/19/2022 6554 30297 21,240.00 2,750.00
4/19/2022 6555 30364 19,760.00 2,750.00
4/19/2022 6556 30173 17,770.00 2,750.00
4/19/2022 6557 30164 13,500.00 2,750.00
4/19/2022 6558 30273 19,100.00 2,750.00
4/19/2022 6559 30817 16,680.00 2,750.00
4/19/2022 6560 30274 20,260.00 2,750.00
4/19/2022 6561 30365 21,420.00 2,750.00
4/19/2022 6562 30296 18,900.00 2,750.00
4/19/2022 6563 1036 30,910.00 2,750.00
4/19/2022 6564 30445 15,890.00 2,750.00
4/19/2022 6565 30807 16,160.00 2,750.00
4/19/2022 6566 30300 16,670.00 2,750.00
4/19/2022 6567 30275 17,680.00 2,750.00
4/19/2022 6568 30303 18,250.00 2,750.00
4/19/2022 6569 30184 12,340.00 2,750.00
4/19/2022 6570 30386 14,620.00 2,750.00
4/19/2022 6571 30164 10,750.00 2,750.00
4/19/2022 6572 30173 14,820.00 2,750.00
4/19/2022 6573 30297 20,030.00 2,750.00
4/19/2022 6574 30448 5,160.00 2,750.00
4/19/2022 6575 30300 18,260.00 2,750.00
4/19/2022 6576 30364 15,970.00 2,750.00
4/19/2022 6577 30274 15,050.00 2,750.00
4/19/2022 6578 30273 15,780.00 2,750.00
4/19/2022 6579 30807 17,490.00 2,750.00
4/19/2022 6580 30562 15,640.00 2,750.00
4/19/2022 6581 30817 13,720.00 2,750.00
4/19/2022 6582 30275 16,660.00 2,750.00
4/19/2022 6583 30445 13,700.00 2,750.00
4/19/2022 6584 30443 15,630.00 2,750.00
4/19/2022 6585 30303 16,900.00 2,750.00
4/19/2022 6586 30386 14,200.00 2,750.00
4/19/2022 6587 30164 14,360.00 2,750.00
4/19/2022 6588 30184 11,780.00 2,750.00
4/19/2022 6589 30297 17,360.00 2,750.00
4/19/2022 6590 30173 18,460.00 2,750.00
4/20/2022 6591 30358 21,490.00 2,750.00
4/20/2022 6592 30364 17,720.00 2,750.00
4/20/2022 6593 30817 14,360.00 2,750.00
4/20/2022 6594 30300 17,210.00 2,750.00
4/20/2022 6595 30303 21,120.00 2,750.00
4/20/2022 6596 30113 12,530.00 2,750.00
4/20/2022 6597 30448 17,100.00 2,750.00
4/20/2022 6598 30365 17,360.00 2,750.00
4/20/2022 6599 30443 19,070.00 2,750.00
4/20/2022 6600 30164 13,200.00 2,750.00
4/20/2022 6601 30438 17,570.00 2,750.00
4/20/2022 6602 30445 23,640.00 2,750.00
4/20/2022 6603 30296 22,000.00 2,750.00
4/20/2022 6604 30275 16,350.00 2,750.00
4/20/2022 6605 30297 21,580.00 2,750.00
4/20/2022 6606 30173 17,830.00 2,750.00
4/20/2022 6607 30562 20,300.00 2,750.00
4/20/2022 6608 30273 20,980.00 2,750.00
4/20/2022 6609 3096 18,080.00 2,750.00
4/20/2022 6610 30358 23,320.00 2,750.00
4/20/2022 6611 30364 23,620.00 2,750.00
4/20/2022 6612 30448 18,600.00 2,750.00
4/20/2022 6613 30300 19,850.00 2,750.00
4/20/2022 6614 30443 21,220.00 2,750.00
4/20/2022 6615 30303 22,780.00 2,750.00
4/20/2022 6616 30164 12,350.00 2,750.00
4/20/2022 6617 30817 17,240.00 2,750.00
4/20/2022 6618 30438 16,440.00 2,750.00
4/20/2022 6619 30297 21,270.00 2,750.00
4/20/2022 6620 30275 21,320.00 2,750.00
4/20/2022 6621 30386 17,710.00 2,750.00
4/20/2022 6622 30448 18,350.00 2,750.00
4/20/2022 6623 30296 23,900.00 2,750.00
4/20/2022 6624 30364 21,980.00 2,750.00
4/20/2022 6625 30445 10,550.00 2,750.00
4/20/2022 6626 30358 21,370.00 2,750.00
4/20/2022 6627 3096 18,000.00 2,750.00
4/20/2022 6628 30273 23,310.00 2,750.00
4/20/2022 6629 30817 17,710.00 2,750.00
4/20/2022 6630 30300 24,140.00 2,750.00
4/20/2022 6631 30243 20,920.00 2,750.00
4/20/2022 6632 30294 22,640.00 2,750.00
4/20/2022 6633 30164 15,900.00 2,750.00
4/20/2022 6634 30443 19,510.00 2,750.00
4/20/2022 6635 30184 16,000.00 2,750.00
4/20/2022 6636 30303 15,710.00 2,750.00
4/20/2022 6637 30297 22,690.00 2,750.00
4/20/2022 6638 30448 18,570.00 2,750.00
4/20/2022 6639 30562 18,800.00 2,750.00
4/20/2022 6640 30386 14,350.00 2,750.00
4/20/2022 6641 30275 19,190.00 2,750.00
4/20/2022 6642 30364 17,520.00 2,750.00
4/20/2022 6643 30296 16,980.00 2,750.00
4/20/2022 6644 3096 17,590.00 2,750.00
4/20/2022 6645 30358 20,350.00 2,750.00
4/20/2022 6646 30817 17,990.00 2,750.00
4/20/2022 6647 30445 3,750.00 2,750.00
4/20/2022 6648 30193 15,810.00 2,750.00
4/20/2022 6649 30443 18,620.00 2,750.00
4/20/2022 6650 30300 17,790.00 2,750.00
4/20/2022 6651 30297 20,720.00 2,750.00
4/20/2022 6652 30243 20,670.00 2,750.00
4/20/2022 6653 30164 14,670.00 2,750.00
4/20/2022 6654 30364 24,840.00 2,750.00
4/20/2022 6655 3096 17,750.00 2,750.00
4/20/2022 6656 30273 20,620.00 2,750.00
4/20/2022 6657 30358 20,290.00 2,750.00
4/20/2022 6658 30303 19,910.00 2,750.00
4/20/2022 6659 30275 19,980.00 2,750.00
4/20/2022 6660 30448 16,210.00 2,750.00
4/20/2022 6661 30294 1,240.00 2,750.00
4/20/2022 6662 30386 16,270.00 2,750.00
4/20/2022 6663 30296 20,190.00 2,750.00
4/20/2022 6664 30493 16,290.00 2,750.00
4/20/2022 6665 30113 15,010.00 2,750.00
4/20/2022 6666 30300 22,840.00 2,750.00
4/20/2022 6667 30443 19,440.00 2,750.00
4/20/2022 6668 30303 20,960.00 2,750.00
4/20/2022 6669 30438 16,940.00 2,750.00
4/20/2022 6670 30274 18,070.00 2,750.00
4/20/2022 6671 30817 13,380.00 2,750.00
4/20/2022 6672 30297 22,090.00 2,750.00
4/20/2022 6673 30365 22,380.00 2,750.00
4/20/2022 6674 30364 20,610.00 2,750.00
4/20/2022 6675 30113 13,930.00 2,750.00
4/20/2022 6676 30243 22,810.00 2,750.00
4/20/2022 6677 30358 32,890.00 2,750.00
4/20/2022 6678 30164 17,110.00 2,750.00
4/20/2022 6679 30296 28,890.00 2,750.00
4/20/2022 6680 30294 25,220.00 2,750.00
4/20/2022 6681 30365 19,630.00 2,750.00
4/20/2022 6682 30273 23,400.00 2,750.00
4/20/2022 6684 30358 21,840.00 2,750.00
4/20/2022 6685 30164 12,370.00 2,750.00
4/20/2022 6686 30817 18,080.00 2,750.00
4/20/2022 6687 30193 17,210.00 2,750.00
4/20/2022 6688 30807 15,040.00 2,750.00
4/20/2022 6689 30438 14,350.00 2,750.00
4/20/2022 6690 30243 21,330.00 2,750.00
4/20/2022 6691 30184 12,070.00 2,750.00
4/20/2022 6693 30443 19,770.00 2,750.00
4/20/2022 6694 30303 18,670.00 2,750.00
4/20/2022 6695 30300 17,680.00 2,750.00
4/20/2022 6696 30297 21,730.00 2,750.00
4/20/2022 6697 30275 12,870.00 2,750.00
4/20/2022 6698 3096 13,410.00 2,750.00
4/20/2022 6699 30365 19,230.00 2,750.00
4/20/2022 6700 30364 20,450.00 2,750.00
4/20/2022 6701 30358 17,870.00 2,750.00
4/20/2022 6702 30273 18,320.00 2,750.00
4/20/2022 6703 30296 19,850.00 2,750.00
4/20/2022 6704 30274 18,400.00 2,750.00
4/20/2022 6706 30164 11,110.00 2,750.00
4/20/2022 6707 30445 13,000.00 2,750.00
4/20/2022 6708 30386 15,220.00 2,750.00
4/20/2022 6709 30493 13,490.00 2,750.00
4/20/2022 6710 30193 11,310.00 2,750.00
4/20/2022 6711 30243 21,350.00 2,750.00
4/20/2022 6712 30448 16,620.00 2,750.00
4/20/2022 6713 30817 16,980.00 2,750.00
4/20/2022 6714 30807 13,390.00 2,750.00
4/20/2022 6715 30297 13,160.00 2,750.00
4/20/2022 6716 30303 18,800.00 2,750.00
4/20/2022 6717 30273 19,300.00 2,750.00
4/20/2022 6718 30184 7,670.00 2,750.00
4/20/2022 6719 30562 20,820.00 2,750.00
4/20/2022 6720 30300 18,470.00 2,750.00
4/20/2022 6721 30365 20,270.00 2,750.00
4/20/2022 6722 30364 17,310.00 2,750.00
4/20/2022 6723 30438 13,530.00 2,750.00
4/20/2022 6724 3096 18,450.00 2,750.00
4/20/2022 6725 30275 20,460.00 2,750.00
4/20/2022 6726 30358 21,810.00 2,750.00
4/20/2022 6727 30443 20,170.00 2,750.00
4/20/2022 6728 30493 15,350.00 2,750.00
4/20/2022 6729 30274 19,430.00 2,750.00
4/20/2022 6730 30164 11,910.00 2,750.00
4/20/2022 6731 30113 13,330.00 2,750.00
4/20/2022 6732 30386 15,130.00 2,750.00
4/20/2022 6733 30445 17,460.00 2,750.00
4/21/2022 6735 30364 23,240.00 2,750.00
4/21/2022 6736 30817 16,030.00 2,750.00
4/21/2022 6737 30300 18,810.00 2,750.00
4/21/2022 6738 30274 21,870.00 2,750.00
4/21/2022 6739 30303 22,880.00 2,750.00
4/21/2022 6740 30294 18,760.00 2,750.00
4/21/2022 6741 30358 21,050.00 2,750.00
4/21/2022 6742 30113 14,830.00 2,750.00
4/21/2022 6743 30443 19,410.00 2,750.00
4/21/2022 6744 30184 15,850.00 2,750.00
4/21/2022 6745 30297 23,310.00 2,750.00
4/21/2022 6746 30273 22,540.00 2,750.00
4/21/2022 6747 30275 20,080.00 2,750.00
4/21/2022 6748 30365 20,040.00 2,750.00
4/21/2022 6749 30445 20,000.00 2,750.00
4/21/2022 6750 30386 17,430.00 2,750.00
4/21/2022 6751 30364 24,160.00 2,750.00
4/21/2022 6752 30817 19,030.00 2,750.00
4/21/2022 6753 30243 22,030.00 2,750.00
4/21/2022 6754 30164 24,480.00 2,750.00
4/21/2022 6755 30113 13,520.00 2,750.00
4/21/2022 6756 30274 21,080.00 2,750.00
4/21/2022 6757 30358 25,010.00 2,750.00
4/21/2022 6758 30300 21,990.00 2,750.00
4/21/2022 6759 30438 14,300.00 2,750.00
4/21/2022 6760 30443 19,600.00 2,750.00
4/21/2022 6761 30296 20,900.00 2,750.00
4/21/2022 6762 30297 21,960.00 2,750.00
4/21/2022 6763 30303 22,220.00 2,750.00
4/21/2022 6764 30360 21,710.00 2,750.00
4/21/2022 6765 30184 10,820.00 2,750.00
4/21/2022 6766 30807 21,130.00 2,750.00
4/21/2022 6767 30817 16,660.00 2,750.00
4/21/2022 6768 30275 22,140.00 2,750.00
4/21/2022 6769 30365 24,630.00 2,750.00
4/21/2022 6770 30294 19,420.00 2,750.00
4/21/2022 6771 30358 24,900.00 2,750.00
4/21/2022 6772 30445 14,630.00 2,750.00
4/21/2022 6773 30113 16,560.00 2,750.00
4/21/2022 6774 30243 20,570.00 2,750.00
4/21/2022 6775 30386 16,240.00 2,750.00
4/21/2022 6776 30364 24,400.00 2,750.00
4/21/2022 6777 30273 25,290.00 2,750.00
4/21/2022 6778 30297 21,360.00 2,750.00
4/21/2022 6779 30443 20,880.00 2,750.00
4/21/2022 6780 30817 16,870.00 2,750.00
4/21/2022 6781 30296 22,210.00 2,750.00
4/21/2022 6782 30184 14,460.00 2,750.00
4/21/2022 6783 30164 14,410.00 2,750.00
4/21/2022 6784 30438 15,230.00 2,750.00
4/21/2022 6785 30274 21,340.00 2,750.00
4/21/2022 6786 30807 16,860.00 2,750.00
4/21/2022 6787 30365 18,170.00 2,750.00
4/21/2022 6788 30358 22,890.00 2,750.00
4/21/2022 6789 30303 17,720.00 2,750.00
4/21/2022 6790 30364 20,690.00 2,750.00
4/21/2022 6791 30275 21,940.00 2,750.00
4/21/2022 6792 30445 12,170.00 2,750.00
4/21/2022 6793 3096 17,410.00 2,750.00
4/21/2022 6794 30297 19,560.00 2,750.00
4/21/2022 6795 30273 20,510.00 2,750.00
4/21/2022 6796 30164 17,890.00 2,750.00
4/21/2022 6797 30807 14,890.00 2,750.00
4/21/2022 6798 30113 11,240.00 2,750.00
4/21/2022 6799 30243 21,180.00 2,750.00
4/21/2022 6800 30386 17,010.00 2,750.00
4/21/2022 6801 30296 19,260.00 2,750.00
4/21/2022 6802 30493 16,630.00 2,750.00
4/21/2022 6803 30274 20,410.00 2,750.00
4/21/2022 6804 30443 17,960.00 2,750.00
4/21/2022 6805 30144 14,480.00 2,750.00
4/21/2022 6806 30364 18,770.00 2,750.00
4/21/2022 6807 30365 19,710.00 2,750.00
4/21/2022 6808 30300 19,650.00 2,750.00
4/21/2022 6809 30817 15,060.00 2,750.00
4/21/2022 6810 30358 20,440.00 2,750.00
4/21/2022 6811 30303 19,410.00 2,750.00
4/21/2022 6812 30438 16,510.00 2,750.00
4/21/2022 6813 30360 21,290.00 2,750.00
4/21/2022 6814 30184 10,980.00 2,750.00
4/21/2022 6815 30335 15,510.00 2,750.00
4/21/2022 6816 30275 17,810.00 2,750.00
4/21/2022 6817 30153 13,920.00 2,750.00
4/21/2022 6818 30273 25,000.00 2,750.00
4/21/2022 6819 30297 19,210.00 2,750.00
4/21/2022 6820 30243 21,650.00 2,750.00
4/21/2022 6821 30562 15,520.00 2,750.00
4/21/2022 6822 30474 17,070.00 2,750.00
4/21/2022 6823 30445 14,010.00 2,750.00
4/21/2022 6824 30296 17,150.00 2,750.00
4/21/2022 6825 30274 20,900.00 2,750.00
4/21/2022 6826 30364 18,000.00 2,750.00
4/21/2022 6827 30807 15,650.00 2,750.00
4/21/2022 6828 3096 17,170.00 2,750.00
4/21/2022 6829 30279 19,210.00 2,750.00
4/21/2022 6830 30144 16,360.00 2,750.00
4/21/2022 6832 30360 20,070.00 2,750.00
4/21/2022 6833 30274 22,620.00 2,750.00
4/21/2022 6835 30358 19,710.00 2,750.00
4/21/2022 6836 30445 18,060.00 2,750.00
4/21/2022 6837 30807 19,780.00 2,750.00
4/21/2022 6838 30335 16,590.00 2,750.00
4/21/2022 6839 30153 14,140.00 2,750.00
4/21/2022 6840 30297 22,240.00 2,750.00
4/21/2022 6841 30164 13,480.00 2,750.00
4/21/2022 6842 30817 14,880.00 2,750.00
4/21/2022 6843 30296 24,030.00 2,750.00
4/21/2022 6844 3096 18,910.00 2,750.00
4/21/2022 6845 30243 20,330.00 2,750.00
4/21/2022 6846 30291 10,980.00 2,750.00
4/21/2022 6847 30300 19,270.00 2,750.00
4/21/2022 6848 30365 23,460.00 2,750.00
4/21/2022 6849 30386 16,250.00 2,750.00
4/21/2022 6850 30273 20,570.00 2,750.00
4/21/2022 6851 30360 19,830.00 2,750.00
4/21/2022 6852 30443 19,820.00 2,750.00
4/21/2022 6853 30294 19,070.00 2,750.00
4/21/2022 6854 30303 22,900.00 2,750.00
4/21/2022 6855 30274 19,800.00 2,750.00
4/21/2022 6856 30807 16,580.00 2,750.00
4/21/2022 6857 30364 18,230.00 2,750.00
4/21/2022 6858 30193 12,870.00 2,750.00
4/21/2022 6859 30295 21,050.00 2,750.00
4/21/2022 6860 30445 17,870.00 2,750.00
4/21/2022 6861 30113 2,500.00 2,750.00
4/21/2022 6862 30335 17,810.00 2,750.00
4/21/2022 6863 30153 15,480.00 2,750.00
4/21/2022 6864 30358 15,100.00 2,750.00
4/21/2022 6865 30297 19,770.00 2,750.00
4/21/2022 6866 3096 19,050.00 2,750.00
4/21/2022 6867 30817 15,960.00 2,750.00
4/21/2022 6868 30443 11,750.00 2,750.00
4/21/2022 6869 30243 18,880.00 2,750.00
4/21/2022 6870 30365 17,230.00 2,750.00
4/21/2022 6871 30360 16,580.00 2,750.00
4/21/2022 6872 30273 17,060.00 2,750.00
4/21/2022 6873 30296 16,060.00 2,750.00
4/21/2022 6874 30807 14,600.00 2,750.00
4/21/2022 6875 30274 15,800.00 2,750.00
4/21/2022 6876 30364 17,420.00 2,750.00
4/21/2022 6877 30164 10,850.00 2,750.00
4/21/2022 6878 30386 11,120.00 2,750.00
4/21/2022 6879 30291 12,920.00 2,750.00
4/21/2022 6880 30303 16,270.00 2,750.00
4/21/2022 6881 30275 19,800.00 2,750.00
4/21/2022 6882 30300 17,550.00 2,750.00
4/21/2022 6883 30193 11,700.00 2,750.00
4/21/2022 6884 30294 20,080.00 2,750.00
4/21/2022 6885 30445 15,020.00 2,750.00
4/22/2022 6887 30300 14,220.00 2,750.00
4/22/2022 6888 30807 15,230.00 2,750.00
4/22/2022 6889 30335 15,550.00 2,750.00
4/22/2022 6890 30274 18,310.00 2,750.00
4/22/2022 6891 30817 13,780.00 2,750.00
4/22/2022 6892 30193 12,980.00 2,750.00
4/22/2022 6893 30113 11,110.00 2,750.00
4/22/2022 6894 30360 18,500.00 2,750.00
4/22/2022 6895 30817 14,410.00 2,750.00
4/22/2022 6896 30164 12,130.00 2,750.00
4/22/2022 6897 30443 16,050.00 2,750.00
4/22/2022 6898 30445 15,810.00 2,750.00
4/22/2022 6899 30358 18,760.00 2,750.00
4/22/2022 6900 30297 17,630.00 2,750.00
4/22/2022 6901 30303 18,210.00 2,750.00
4/22/2022 6902 30365 16,090.00 2,750.00
4/22/2022 6903 30291 10,900.00 2,750.00
4/22/2022 6904 30144 13,200.00 2,750.00
4/22/2022 6905 30184 12,590.00 2,750.00
4/22/2022 6906 30153 11,560.00 2,750.00
4/22/2022 6907 30300 17,740.00 2,750.00
4/22/2022 6908 30807 15,080.00 2,750.00
4/22/2022 6909 30275 15,030.00 2,750.00
4/22/2022 6910 30493 16,920.00 2,750.00
4/22/2022 6911 3096 15,520.00 2,750.00
4/22/2022 6912 30294 19,220.00 2,750.00
4/22/2022 6913 30243 19,300.00 2,750.00
4/22/2022 6914 30113 12,620.00 2,750.00
4/22/2022 6915 30817 13,280.00 2,750.00
4/22/2022 6916 30164 14,540.00 2,750.00
4/22/2022 6918 30445 11,800.00 2,750.00
4/22/2022 6919 30360 21,260.00 2,750.00
4/22/2022 6920 30358 21,250.00 2,750.00
4/22/2022 6921 30364 22,050.00 2,750.00
4/22/2022 6922 30193 10,740.00 2,750.00
4/22/2022 6923 30184 10,590.00 2,750.00
4/22/2022 6924 30291 9,580.00 2,750.00
4/22/2022 6925 30300 13,490.00 2,750.00
4/22/2022 6926 30273 23,040.00 2,750.00
4/22/2022 6927 30807 14,060.00 2,750.00
4/22/2022 6928 3096 16,720.00 2,750.00
4/22/2022 6931 30303 20,380.00 2,750.00
4/22/2022 6932 30164 8,920.00 2,750.00
4/22/2022 6934 30386 11,870.00 2,750.00
4/22/2022 6935 30297 20,830.00 2,750.00
4/22/2022 6936 30445 16,600.00 2,750.00
4/22/2022 6937 30364 21,030.00 2,750.00
4/22/2022 6938 30193 12,380.00 2,750.00
4/22/2022 6939 30817 13,370.00 2,750.00
4/22/2022 6940 30358 13,840.00 2,750.00
4/22/2022 6941 30294 16,610.00 2,750.00
4/22/2022 6942 30243 16,820.00 2,750.00
4/22/2022 6943 30360 24,260.00 2,750.00
4/29/2022 7487 30303 16,480.00 2,750.00
4/29/2022 7488 30365 16,010.00 2,750.00
4/29/2022 7489 30275 19,450.00 2,750.00
4/29/2022 7490 30360 18,640.00 2,750.00
4/29/2022 7491 30358 18,300.00 2,750.00
4/29/2022 7492 30300 19,860.00 2,750.00
4/29/2022 7493 30274 16,450.00 2,750.00
4/29/2022 7494 30297 17,630.00 2,750.00
4/29/2022 7495 30445 14,200.00 2,750.00
4/29/2022 7496 30443 17,610.00 2,750.00
4/29/2022 7497 30438 12,620.00 2,750.00
4/29/2022 7498 30273 20,060.00 2,750.00
4/29/2022 7499 3096 14,890.00 2,750.00
4/29/2022 7500 30294 15,920.00 2,750.00
4/29/2022 7501 30365 13,760.00 2,750.00
4/29/2022 7502 30303 14,080.00 2,750.00
4/29/2022 7503 30360 19,920.00 2,750.00
4/29/2022 7504 30358 19,910.00 2,750.00
4/29/2022 7505 30562 16,470.00 2,750.00
4/29/2022 7506 30275 20,000.00 2,750.00
4/29/2022 7507 30296 15,930.00 2,750.00
4/29/2022 7508 30364 18,530.00 2,750.00
4/29/2022 7509 30297 17,980.00 2,750.00
4/29/2022 7510 30274 19,880.00 2,750.00
4/29/2022 7511 30438 13,320.00 2,750.00
4/29/2022 7512 30443 18,080.00 2,750.00
4/29/2022 7513 30273 17,930.00 2,750.00
4/29/2022 7514 30300 19,170.00 2,750.00
4/29/2022 7515 3096 15,780.00 2,750.00
4/29/2022 7516 30294 13,410.00 2,750.00
4/29/2022 7517 30360 17,660.00 2,750.00
4/29/2022 7519 30297 18,910.00 2,750.00
4/29/2022 7520 30303 15,910.00 2,750.00
4/29/2022 7521 30275 19,530.00 2,750.00
4/29/2022 7522 30274 18,650.00 2,750.00
4/29/2022 7523 30443 17,260.00 2,750.00
4/29/2022 7524 30438 15,370.00 2,750.00
4/29/2022 7525 30273 15,220.00 2,750.00
4/29/2022 7526 30364 20,880.00 2,750.00
4/29/2022 7527 30445 16,970.00 2,750.00
4/29/2022 7528 30358 17,640.00 2,750.00
4/29/2022 7529 30300 11,930.00 2,750.00
4/29/2022 7530 3096 17,630.00 2,750.00
4/29/2022 7531 30173 15,590.00 2,750.00
4/29/2022 7532 30443 18,440.00 2,750.00
4/29/2022 7533 30364 15,470.00 2,750.00
4/29/2022 7534 30438 16,170.00 2,750.00
4/29/2022 7535 30294 14,560.00 2,750.00
4/29/2022 7536 30303 15,420.00 2,750.00
4/29/2022 7537 30275 17,500.00 2,750.00
4/29/2022 7538 30273 17,370.00 2,750.00
4/29/2022 7539 30296 19,510.00 2,750.00
4/29/2022 7540 30358 18,020.00 2,750.00
4/29/2022 7541 30365 13,790.00 2,750.00
4/29/2022 7542 30364 15,270.00 2,750.00
4/29/2022 7543 30300 13,430.00 2,750.00
4/29/2022 7544 30443 17,420.00 2,750.00
4/29/2022 7545 3096 15,960.00 2,750.00
4/29/2022 7546 30445 17,450.00 2,750.00
4/29/2022 7547 30438 13,000.00 2,750.00
4/29/2022 7548 30386 18,590.00 2,750.00
4/29/2022 7549 30173 20,310.00 2,750.00
4/29/2022 7550 30294 18,550.00 2,750.00
4/29/2022 7551 30358 17,850.00 2,750.00
4/29/2022 7552 30365 15,350.00 2,750.00
4/29/2022 7553 30275 19,150.00 2,750.00
4/29/2022 7554 19,540.00 2,750.00
4/29/2022 7555 30300 17,950.00 2,750.00
4/29/2022 7556 30364 14,430.00 2,750.00
4/29/2022 7557 30445 16,590.00 2,750.00
4/29/2022 7558 3096 14,680.00 2,750.00
4/29/2022 7559 30386 16,030.00 2,750.00
4/29/2022 7560 30273 16,870.00 2,750.00
4/29/2022 7561 30443 16,040.00 2,750.00
4/30/2022 7562 30817 15,580.00 2,750.00
4/30/2022 7563 30300 15,330.00 2,750.00
4/30/2022 7564 30445 17,200.00 2,750.00
4/30/2022 7565 30275 17,720.00 2,750.00
4/30/2022 7566 30365 16,000.00 2,750.00
4/30/2022 7567 30273 17,900.00 2,750.00
4/30/2022 7568 30297 16,940.00 2,750.00
4/30/2022 7569 30294 15,520.00 2,750.00
4/30/2022 7570 30562 16,830.00 2,750.00
4/30/2022 7571 30274 17,770.00 2,750.00
4/30/2022 7572 30113 16,480.00 2,750.00
4/30/2022 7573 30386 17,460.00 2,750.00
4/30/2022 7574 30438 12,770.00 2,750.00
4/30/2022 7575 30364 14,130.00 2,750.00
4/30/2022 7576 30173 13,160.00 2,750.00
4/30/2022 7577 30358 17,230.00 2,750.00
4/30/2022 7578 30360 20,000.00 2,750.00
4/30/2022 7579 30443 15,810.00 2,750.00
4/30/2022 7580 30300 15,610.00 2,750.00
4/30/2022 7581 30365 16,900.00 2,750.00
4/30/2022 7582 3096 15,440.00 2,750.00
4/30/2022 7583 30275 20,060.00 2,750.00
4/30/2022 7584 30303 12,740.00 2,750.00
4/30/2022 7585 30273 19,500.00 2,750.00
4/30/2022 7587 30365 6,660.00 2,750.00
4/30/2022 7589 30360 17,260.00 2,750.00
4/30/2022 7590 30275 13,960.00 2,750.00
4/30/2022 7591 30274 13,360.00 2,750.00
4/30/2022 7592 17,660.00 2,750.00
4/30/2022 7594 30438 13,650.00 2,750.00
4/30/2022 7595 30364 16,590.00 2,750.00
4/30/2022 7596 30299 17,440.00 2,750.00
4/30/2022 7597 3096 16,460.00 2,750.00
4/30/2022 7598 30817 15,350.00 2,750.00
4/30/2022 7599 30445 15,970.00 2,750.00
4/30/2022 7600 15,220.00 2,750.00
4/30/2022 7601 30297 16,140.00 2,750.00
4/30/2022 7602 30365 16,930.00 2,750.00
4/30/2022 7603 30300 14,200.00 2,750.00
4/30/2022 7604 30296 17,010.00 2,750.00
4/30/2022 7605 30360 15,320.00 2,750.00
4/30/2022 7606 30443 16,240.00 2,750.00
4/30/2022 7607 30275 16,780.00 2,750.00
4/30/2022 7608 30386 12,100.00 2,750.00
4/30/2022 7609 30303 18,710.00 2,750.00
4/30/2022 7610 30297 17,919.00 2,750.00
4/30/2022 7611 30438 14,900.00 2,750.00
4/30/2022 7612 30817 12,260.00 2,750.00
4/30/2022 7613 30113 11,120.00 2,750.00
4/30/2022 7614 30294 15,300.00 2,750.00
4/30/2022 7615 30358 21,380.00 2,750.00
4/30/2022 7616 30364 16,930.00 2,750.00
4/30/2022 7617 3096 16,470.00 2,750.00
4/30/2022 7618 30297 18,470.00 2,750.00
4/30/2022 7619 30810 15,470.00 2,750.00
4/30/2022 7620 30445 14,230.00 2,750.00
4/30/2022 7621 30273 16,990.00 2,750.00
4/30/2022 7622 30365 17,710.00 2,750.00
4/30/2022 7623 30153 12,560.00 2,750.00
4/30/2022 7624 30275 10,570.00 2,750.00
4/30/2022 7625 30360 21,380.00 2,750.00
4/30/2022 7626 30274 18,823.00 2,750.00
4/30/2022 7627 30300 14,000.00 2,750.00
4/30/2022 7628 30303 13,100.00 2,750.00
4/30/2022 7629 30274 19,540.00 2,750.00
4/30/2022 7630 30474 12,770.00 2,750.00
4/30/2022 7631 3096 14,430.00 2,750.00
4/30/2022 7632 30299 15,130.00 2,750.00
4/30/2022 7633 30365 16,300.00 2,750.00
4/30/2022 7634 30438 13,610.00 2,750.00
4/30/2022 7635 30358 16,160.00 2,750.00
4/30/2022 7636 30297 16,080.00 2,750.00
4/30/2022 7637 30193 13,230.00 2,750.00
4/30/2022 7638 30817 13,690.00 2,750.00
4/30/2022 7639 30300 10,780.00 2,750.00
4/30/2022 7640 3094 15,270.00 2,750.00
4/30/2022 7641 30273 15,140.00 2,750.00
4/30/2022 7642 30294 12,520.00 2,750.00
4/30/2022 7643 30303 20,140.00 2,750.00
4/30/2022 7644 30443 7,720.00 2,750.00
4/30/2022 7645 30106 11,410.00 2,750.00
5/1/2022 7647 30133 8,800.00 2,750.00
5/1/2022 7648 30364 18,220.00 2,750.00
5/1/2022 7649 30296 16,880.00 2,750.00
5/1/2022 7650 30275 16,570.00 2,750.00
5/1/2022 7651 30386 18,360.00 2,750.00
5/1/2022 7652 30443 14,680.00 2,750.00
5/1/2022 7653 30365 13,240.00 2,750.00
5/1/2022 7654 30273 16,800.00 2,750.00
5/1/2022 7655 30358 20,550.00 2,750.00
5/1/2022 7656 30299 15,320.00 2,750.00
5/1/2022 7657 30300 15,810.00 2,750.00
5/1/2022 7658 3096 17,500.00 2,750.00
5/1/2022 7659 30303 14,490.00 2,750.00
5/1/2022 7660 30274 18,770.00 2,750.00
5/1/2022 7661 30360 13,240.00 2,750.00
5/1/2022 7662 30445 15,420.00 2,750.00
5/1/2022 7663 30297 16,650.00 2,750.00
5/1/2022 7664 30817 11,590.00 2,750.00
5/1/2022 7665 30184 7,310.00 2,750.00
5/1/2022 7666 30294 13,150.00 2,750.00
5/1/2022 7667 30364 17,440.00 2,750.00
5/1/2022 7668 30443 17,700.00 2,750.00
5/1/2022 7669 30358 17,020.00 2,750.00
5/1/2022 7670 30275 17,430.00 2,750.00
5/1/2022 7672 30296 14,950.00 2,750.00
5/1/2022 7674 30297 13,930.00 2,750.00
5/1/2022 7675 30273 14,500.00 2,750.00
5/1/2022 7676 13,360.00 2,750.00
5/1/2022 7677 30274 15,880.00 2,750.00
5/1/2022 7679 30303 13,650.00 2,750.00
5/1/2022 7680 30364 18,520.00 2,750.00
5/1/2022 7681 30360 12,690.00 2,750.00
5/1/2022 7682 30817 13,860.00 2,750.00
5/1/2022 7683 30153 13,870.00 2,750.00
5/1/2022 7684 30443 16,720.00 2,750.00
5/1/2022 7685 30358 16,860.00 2,750.00
5/1/2022 7686 30184 9,070.00 2,750.00
5/1/2022 7687 30300 4,530.00 2,750.00
5/1/2022 7688 30493 13,980.00 2,750.00
5/1/2022 7689 30365 17,470.00 2,750.00
5/1/2022 7690 30364 17,060.00 2,750.00
5/1/2022 7691 30360 17,270.00 2,750.00
5/1/2022 7692 30297 16,100.00 2,750.00
5/1/2022 7693 30275 14,640.00 2,750.00
5/1/2022 7694 30125 14,300.00 2,750.00
5/1/2022 7695 30193 11,760.00 2,750.00
5/1/2022 7696 30358 15,590.00 2,750.00
5/1/2022 7697 30303 12,060.00 2,750.00
5/1/2022 7698 30817 12,950.00 2,750.00
5/1/2022 7699 30296 17,080.00 2,750.00
5/1/2022 7700 30273 14,820.00 2,750.00
5/1/2022 7701 30144 11,950.00 2,750.00
5/1/2022 7702 30443 13,160.00 2,750.00
5/1/2022 7703 30386 11,730.00 2,750.00
5/1/2022 7704 30810 13,600.00 2,750.00
5/1/2022 7705 30164 11,560.00 2,750.00
5/1/2022 7706 30448 14,240.00 2,750.00
5/1/2022 7707 30274 16,910.00 2,750.00
5/1/2022 7708 30122 10,710.00 2,750.00
5/1/2022 7709 30365 19,300.00 2,750.00
5/1/2022 7710 30153 14,000.00 2,750.00
5/1/2022 7711 30275 17,380.00 2,750.00
5/1/2022 7712 3096 13,350.00 2,750.00
5/1/2022 7713 30297 17,600.00 2,750.00
5/1/2022 7714 30493 12,150.00 2,750.00
5/1/2022 7715 30184 5,440.00 2,750.00
5/1/2022 7716 30364 14,730.00 2,750.00
5/1/2022 7717 30358 16,700.00 2,750.00
5/1/2022 7718 30106 11,760.00 2,750.00
5/1/2022 7719 30193 11,940.00 2,750.00
5/1/2022 7720 30360 15,450.00 2,750.00
5/1/2022 7721 30445 14,660.00 2,750.00
5/2/2022 7722 30493 13,800.00 2,750.00
5/2/2022 7723 30364 16,210.00 2,750.00
5/2/2022 7724 3096 11,200.00 2,750.00
5/2/2022 7725 30386 12,360.00 2,750.00
5/2/2022 7726 30300 13,410.00 2,750.00
5/2/2022 7727 30358 14,170.00 2,750.00
5/2/2022 7728 30303 12,200.00 2,750.00
5/2/2022 7729 30448 10,560.00 2,750.00
5/2/2022 7730 30443 10,730.00 2,750.00
5/2/2022 7731 30296 15,060.00 2,750.00
5/2/2022 7732 30297 14,220.00 2,750.00
5/2/2022 7733 30106 12,310.00 2,750.00
5/2/2022 7734 30275 16,490.00 2,750.00
5/2/2022 7735 30817 11,810.00 2,750.00
5/2/2022 7736 30273 16,660.00 2,750.00
5/2/2022 7737 30173 32,900.00 2,750.00
5/2/2022 7738 30164 9,350.00 2,750.00
5/2/2022 7739 30274 15,040.00 2,750.00
5/2/2022 7740 30365 12,430.00 2,750.00
5/2/2022 7741 30294 14,430.00 2,750.00
5/2/2022 7742 30364 15,850.00 2,750.00
5/2/2022 7743 30493 12,020.00 2,750.00
5/2/2022 7744 2,750.00
5/2/2022 7745 30807 13,020.00 2,750.00
5/2/2022 7747 30448 13,210.00 2,750.00
5/2/2022 7749 3096 14,550.00 2,750.00
5/2/2022 7750 30386 10,460.00 2,750.00
5/2/2022 7751 30297 21,640.00 2,750.00
5/2/2022 7752 30443 13,690.00 2,750.00
5/2/2022 7754 30144 11,840.00 2,750.00
5/2/2022 7755 30300 13,440.00 2,750.00
5/2/2022 7756 30817 11,080.00 2,750.00
5/2/2022 7757 30113 12,230.00 2,750.00
5/2/2022 7758 30275 17,180.00 2,750.00
5/2/2022 7759 30360 14,670.00 2,750.00
5/2/2022 7760 30173 14,180.00 2,750.00
5/2/2022 7761 30303 15,060.00 2,750.00
5/2/2022 7762 30274 14,270.00 2,750.00
5/2/2022 7763 30106 13,570.00 2,750.00
5/2/2022 7764 30164 13,150.00 2,750.00
5/2/2022 7765 30364 13,720.00 2,750.00
5/2/2022 7766 30474 11,350.00 2,750.00
5/2/2022 7767 30365 5,310.00 2,750.00
5/2/2022 7768 30493 10,540.00 2,750.00
5/2/2022 7769 30296 18,580.00 2,750.00
5/2/2022 7770 30273 15,790.00 2,750.00
5/2/2022 7771 30807 12,780.00 2,750.00
5/2/2022 7772 30125 12,050.00 2,750.00
5/2/2022 7773 30153 10,070.00 2,750.00
5/2/2022 7774 30448 14,100.00 2,750.00
5/2/2022 7775 30299 16,420.00 2,750.00
5/2/2022 7776 30294 13,750.00 2,750.00
5/2/2022 7777 30358 17,460.00 2,750.00
5/2/2022 7778 3096 12,730.00 2,750.00
5/2/2022 7779 30335 12,350.00 2,750.00
5/2/2022 7780 30443 13,820.00 2,750.00
5/2/2022 7781 30297 13,550.00 2,750.00
5/2/2022 7782 30113 9,350.00 2,750.00
5/2/2022 7783 2,750.00
5/2/2022 7784 2,750.00
5/2/2022 7785 30445 11,350.00 2,750.00
5/2/2022 7786 30493 13,310.00 2,750.00
5/2/2022 7787 30144 14,040.00 2,750.00
5/2/2022 7788 30164 9,370.00 2,750.00
5/2/2022 7789 30448 14,800.00 2,750.00
5/2/2022 7790 30807 10,420.00 2,750.00
5/2/2022 7791 30173 10,890.00 2,750.00
5/2/2022 7792 30360 11,730.00 2,750.00
5/2/2022 7793 2,750.00
5/2/2022 7794 30474 16,690.00 2,750.00
5/2/2022 7795 30358 17,040.00 2,750.00
5/2/2022 7796 30106 13,830.00 2,750.00
5/2/2022 7797 30125 14,730.00 2,750.00
5/2/2022 7798 30386 9,950.00 2,750.00
5/2/2022 7799 30297 19,230.00 2,750.00
5/2/2022 7800 30364 17,810.00 2,750.00
5/2/2022 7801 30299 17,510.00 2,750.00
5/2/2022 7802 2,750.00
5/2/2022 7803 30296 17,240.00 2,750.00
5/2/2022 7804 30303 20,000.00 2,750.00
5/2/2022 7805 30273 17,520.00 2,750.00
5/2/2022 7806 30365 16,890.00 2,750.00
5/2/2022 7807 30807 11,460.00 2,750.00
5/2/2022 7808 30443 12,910.00 2,750.00
5/2/2022 7809 30448 13,850.00 2,750.00
5/2/2022 7810 30294 14,080.00 2,750.00
5/2/2022 7811 30493 11,990.00 2,750.00
5/2/2022 7812 30164 11,910.00 2,750.00
5/2/2022 7813 30113 10,070.00 2,750.00
5/2/2022 7814 30122 9,030.00 2,750.00
5/2/2022 7815 30274 16,870.00 2,750.00
5/3/2022 7816 30113 21,290.00 2,750.00
5/3/2022 7817 30360 13,540.00 2,750.00
5/3/2022 7818 30364 16,460.00 2,750.00
5/3/2022 7819 30122 12,590.00 2,750.00
5/3/2022 7820 30817 10,870.00 2,750.00
5/3/2022 7821 30807 18,200.00 2,750.00
5/3/2022 7822 30335 14,920.00 2,750.00
5/3/2022 7823 30300 12,500.00 2,750.00
5/3/2022 7824 30273 14,060.00 2,750.00
5/3/2022 7825 30386 9,700.00 2,750.00
5/3/2022 7826 30299 14,710.00 2,750.00
5/3/2022 7827 30133 9,220.00 2,750.00
5/3/2022 7828 30810 14,200.00 2,750.00
5/3/2022 7829 30153 12,910.00 2,750.00
5/3/2022 7830 30443 12,830.00 2,750.00
5/3/2022 7831 30125 13,860.00 2,750.00
5/3/2022 7832 30493 12,100.00 2,750.00
5/3/2022 7833 30275 15,470.00 2,750.00
5/3/2022 7834 30358 16,380.00 2,750.00
5/3/2022 7835 2,750.00
5/3/2022 7836 30164 13,040.00 2,750.00
5/3/2022 7837 2,750.00
5/3/2022 7838 30297 17,340.00 2,750.00
5/3/2022 7839 30438 10,230.00 2,750.00
5/3/2022 7840 30303 14,760.00 2,750.00
5/3/2022 7841 30274 11,480.00 2,750.00
5/3/2022 7842 30297 14,690.00 2,750.00
5/3/2022 7843 30364 16,180.00 2,750.00
5/3/2022 7844 30360 18,400.00 2,750.00
5/3/2022 7845 30300 14,300.00 2,750.00
5/3/2022 7846 30294 14,920.00 2,750.00
5/3/2022 7847 30807 12,800.00 2,750.00
5/3/2022 7848 30303 14,970.00 2,750.00
5/3/2022 7850 3096 16,920.00 2,750.00
5/3/2022 7852 30443 17,220.00 2,750.00
5/3/2022 7853 30125 16,560.00 2,750.00
5/3/2022 7854 30386 12,950.00 2,750.00
5/3/2022 7855 30493 14,370.00 2,750.00
5/3/2022 7857 30335 16,290.00 2,750.00
5/3/2022 7858 30184 7,800.00 2,750.00
5/3/2022 7859 30274 20,220.00 2,750.00
5/3/2022 7860 30300 15,060.00 2,750.00
5/3/2022 7861 30275 12,640.00 2,750.00
5/3/2022 7862 30122 12,480.00 2,750.00
5/3/2022 7863 30364 20,480.00 2,750.00
5/3/2022 7864 30360 18,850.00 2,750.00
5/3/2022 7865 30438 14,720.00 2,750.00
5/3/2022 7866 30303 17,460.00 2,750.00
5/3/2022 7867 30273 15,390.00 2,750.00
5/3/2022 7868 30296 12,630.00 2,750.00
5/3/2022 7869 30294 15,350.00 2,750.00
5/3/2022 7870 30299 17,430.00 2,750.00
5/3/2022 7871 30184 9,270.00 2,750.00
5/3/2022 7872 30335 14,340.00 2,750.00
5/3/2022 7873 30817 810.00 2,750.00
5/3/2022 7874 30474 10,790.00 2,750.00
5/3/2022 7875 2,750.00
5/3/2022 7876 30106 9,560.00 2,750.00
5/3/2022 7877 30300 13,380.00 2,750.00
5/3/2022 7878 30364 16,210.00 2,750.00
5/3/2022 7879 30562 16,100.00 2,750.00
5/3/2022 7880 30345 12,860.00 2,750.00
5/3/2022 7881 30122 12,060.00 2,750.00
5/3/2022 7882 3096 15,930.00 2,750.00
5/3/2022 7883 30275 18,030.00 2,750.00
5/3/2022 7884 30365 17,310.00 2,750.00
5/3/2022 7885 30164 11,470.00 2,750.00
5/3/2022 7886 30360 20,240.00 2,750.00
5/3/2022 7887 30193 9,860.00 2,750.00
5/3/2022 7888 30493 15,610.00 2,750.00
5/3/2022 7889 30274 17,000.00 2,750.00
5/3/2022 7890 30810 17,300.00 2,750.00
5/3/2022 7891 30125 17,990.00 2,750.00
5/3/2022 7892 30443 16,670.00 2,750.00
5/3/2022 7893 30303 16,130.00 2,750.00
5/3/2022 7894 2,750.00
5/3/2022 7895 30386 12,560.00 2,750.00
5/3/2022 7896 30273 16,680.00 2,750.00
5/3/2022 7897 30133 10,280.00 2,750.00
5/3/2022 7898 30335 15,170.00 2,750.00
5/3/2022 7899 30184 10,670.00 2,750.00
5/3/2022 7900 30153 17,330.00 2,750.00
5/3/2022 7901 30807 12,760.00 2,750.00
5/3/2022 7902 30122 13,420.00 2,750.00
5/3/2022 7903 30294 16,180.00 2,750.00
5/3/2022 7904 30164 8,720.00 2,750.00
5/3/2022 7905 30364 18,080.00 2,750.00
5/3/2022 7906 30106 11,210.00 2,750.00
5/3/2022 7907 30297 17,510.00 2,750.00
5/3/2022 7908 30448 16,140.00 2,750.00
5/3/2022 7909 30474 11,150.00 2,750.00
5/3/2022 7910 30113 10,880.00 2,750.00
5/3/2022 7911 30360 19,750.00 2,750.00
5/3/2022 7912 30365 15,890.00 2,750.00
5/3/2022 7913 30275 14,480.00 2,750.00
5/3/2022 7914 30358 17,750.00 2,750.00
5/3/2022 7915 30562 10,900.00 2,750.00
5/3/2022 7916 30300 16,430.00 2,750.00
5/3/2022 7917 30810 16,430.00 2,750.00
5/3/2022 7918 30493 9,850.00 2,750.00
5/3/2022 7919 30193 12,520.00 2,750.00
5/3/2022 7920 30335 11,420.00 2,750.00
5/3/2022 7921 30807 16,660.00 2,750.00
5/3/2022 7922 30303 15,460.00 2,750.00
5/3/2022 7923 30817 12,950.00 2,750.00
5/3/2022 7924 30122 14,210.00 2,750.00
5/3/2022 7925 30184 11,380.00 2,750.00
5/3/2022 7926 30153 12,610.00 2,750.00
5/3/2022 7927 30448 16,450.00 2,750.00
5/3/2022 7928 30296 16,990.00 2,750.00
5/3/2022 7929 30297 16,490.00 2,750.00
5/3/2022 7930 30273 14,260.00 2,750.00
5/3/2022 7931 30443 15,310.00 2,750.00
5/3/2022 7932 30299 15,910.00 2,750.00
5/3/2022 7933 30125 16,520.00 2,750.00
5/3/2022 7934 30386 16,730.00 2,750.00
5/3/2022 7935 3096 14,800.00 2,750.00
5/3/2022 7936 30133 8,660.00 2,750.00
5/3/2022 7937 30294 15,290.00 2,750.00
5/3/2022 7938 30106 12,230.00 2,750.00
5/3/2022 7939 30274 19,820.00 2,750.00
5/3/2022 7940 30291 15,350.00 2,750.00
5/4/2022 7941 30164 11,190.00 2,750.00
5/4/2022 7942 30364 18,080.00 2,750.00
5/4/2022 7943 14160 14,160.00 2,750.00
5/4/2022 7944 30113 8,960.00 2,750.00
5/4/2022 7945 30360 16,350.00 2,750.00
5/4/2022 7946 30493 15,190.00 2,750.00
5/4/2022 7947 30184 8,940.00 2,750.00
5/4/2022 7948 30365 17,950.00 2,750.00
5/4/2022 7949 30817 13,820.00 2,750.00
5/4/2022 7950 30386 11,750.00 2,750.00
5/4/2022 7951 30303 16,200.00 2,750.00
5/4/2022 7952 30274 17,700.00 2,750.00
5/4/2022 7953 30296 16,040.00 2,750.00
5/4/2022 7954 30273 14,020.00 2,750.00
5/4/2022 7955 30299 15,600.00 2,750.00
5/4/2022 7956 30122 12,450.00 2,750.00
5/4/2022 7957 30474 15,480.00 2,750.00
5/4/2022 7958 30300 15,940.00 2,750.00
5/4/2022 7959 30153 12,330.00 2,750.00
5/4/2022 7960 30106 13,780.00 2,750.00
5/4/2022 7961 30294 18,870.00 2,750.00
5/4/2022 7962 30275 18,930.00 2,750.00
5/4/2022 7963 30125 14,810.00 2,750.00
5/4/2022 7964 30810 23,880.00 2,750.00
5/4/2022 7965 30562 16,200.00 2,750.00
5/4/2022 7966 30358 17,920.00 2,750.00
5/4/2022 7967 30144 18,160.00 2,750.00
5/4/2022 7968 30364 20,090.00 2,750.00
5/4/2022 7969 30297 18,880.00 2,750.00
5/4/2022 7970 30113 12,290.00 2,750.00
5/4/2022 7971 30493 14,500.00 2,750.00
5/4/2022 7972 30807 14,490.00 2,750.00
5/4/2022 7973 30373 17,040.00 2,750.00
5/4/2022 7974 30184 10,030.00 2,750.00
5/4/2022 7975 30274 16,280.00 2,750.00
5/4/2022 7976 30360 12,870.00 2,750.00
5/4/2022 7977 30443 12,890.00 2,750.00
5/4/2022 7978 30448 13,060.00 2,750.00
5/4/2022 7979 30386 14,190.00 2,750.00
5/4/2022 7980 30273 17,580.00 2,750.00
5/4/2022 7982 30296 17,540.00 2,750.00
5/4/2022 7983 30817 12,180.00 2,750.00
5/4/2022 7984 30299 17,520.00 2,750.00
5/4/2022 7985 30153 13,930.00 2,750.00
5/4/2022 7986 30106 13,070.00 2,750.00
5/4/2022 7987 30365 18,260.00 2,750.00
5/4/2022 7988 30300 15,680.00 2,750.00
5/4/2022 7989 30358 18,270.00 2,750.00
5/4/2022 7990 30364 17,650.00 2,750.00
5/4/2022 7991 30125 15,990.00 2,750.00
5/4/2022 7992 30493 13,920.00 2,750.00
5/4/2022 7993 30807 350.00 2,750.00
5/4/2022 7994 30297 18,090.00 2,750.00
5/4/2022 7995 30184 8,400.00 2,750.00
5/4/2022 7996 30448 13,090.00 2,750.00
5/4/2022 7997 30360 21,280.00 2,750.00
5/4/2022 7998 30294 17,140.00 2,750.00
5/4/2022 7999 30303 16,790.00 2,750.00
5/4/2022 8000 30373 16,140.00 2,750.00
5/4/2022 8001 30386 10,950.00 2,750.00
5/4/2022 8002 30275 19,800.00 2,750.00
5/4/2022 8003 30562 15,080.00 2,750.00
5/4/2022 8004 30365 18,910.00 2,750.00
5/4/2022 8005 30273 17,550.00 2,750.00
5/4/2022 8006 30106 15,520.00 2,750.00
5/4/2022 8007 30364 20,010.00 2,750.00
5/4/2022 8008 30274 15,750.00 2,750.00
5/4/2022 8009 30164 13,670.00 2,750.00
5/4/2022 8010 30113 12,400.00 2,750.00
5/4/2022 8011 30358 19,980.00 2,750.00
5/4/2022 8012 30493 13,240.00 2,750.00
5/4/2022 8013 30297 19,260.00 2,750.00
5/4/2022 8014 30448 15,150.00 2,750.00
5/4/2022 8015 30300 17,420.00 2,750.00
5/4/2022 8016 30443 15,740.00 2,750.00
5/4/2022 8017 30193 13,110.00 2,750.00
5/4/2022 8018 30296 16,230.00 2,750.00
5/4/2022 8019 30817 13,910.00 2,750.00
5/4/2022 8020 30184 9,920.00 2,750.00
5/4/2022 8021 30360 14,280.00 2,750.00
5/4/2022 8022 30106 12,180.00 2,750.00
5/4/2022 8023 30274 16,970.00 2,750.00
5/4/2022 8024 30106 12,180.00 2,750.00
5/4/2022 8025 30164 11,460.00 2,750.00
5/4/2022 8026 30113 11,150.00 2,750.00
5/4/2022 8027 30358 17,150.00 2,750.00
5/4/2022 8028 30297 19,090.00 2,750.00
5/4/2022 8029 30493 11,690.00 2,750.00
5/4/2022 8030 30448 15,150.00 2,750.00
5/4/2022 8031 30300 15,820.00 2,750.00
5/4/2022 8032 30807 14,320.00 2,750.00
5/4/2022 8033 30443 14,630.00 2,750.00
5/4/2022 8034 30273 18,070.00 2,750.00
5/4/2022 8035 30106 10,530.00 2,750.00
5/4/2022 8036 30274 17,760.00 2,750.00
5/4/2022 8037 30297 15,980.00 2,750.00
5/4/2022 8038 30275 15,160.00 2,750.00
5/4/2022 8039 30360 16,270.00 2,750.00
5/4/2022 8040 30365 13,510.00 2,750.00
5/4/2022 8041 30296 13,450.00 2,750.00
5/4/2022 8042 30113 11,120.00 2,750.00
5/4/2022 8043 30364 16,080.00 2,750.00
5/4/2022 8044 30493 14,440.00 2,750.00
5/4/2022 8045 30164 10,310.00 2,750.00
5/4/2022 8046 30299 16,930.00 2,750.00
5/5/2022 8047 30807 14,400.00 2,750.00
5/5/2022 8048 30358 17,820.00 2,750.00
5/5/2022 8049 30817 12,290.00 2,750.00
5/5/2022 8050 30300 17,290.00 2,750.00
5/5/2022 8051 30275 15,470.00 2,750.00
5/5/2022 8052 30299 16,350.00 2,750.00
5/5/2022 8053 30274 15,530.00 2,750.00
5/5/2022 8054 30443 16,100.00 2,750.00
5/5/2022 8055 30493 15,280.00 2,750.00
5/5/2022 8056 30296 15,600.00 2,750.00
5/5/2022 8057 30365 17,190.00 2,750.00
5/5/2022 8058 30303 16,450.00 2,750.00
5/5/2022 8059 30184 9,430.00 2,750.00
5/5/2022 8060 30164 9,450.00 2,750.00
5/5/2022 8061 30113 10,810.00 2,750.00
5/5/2022 8062 30297 17,800.00 2,750.00
5/5/2022 8063 30274 15,530.00 2,750.00
5/5/2022 8064 30443 16,100.00 2,750.00
5/5/2022 8065 30335 14,610.00 2,750.00
5/5/2022 8066 30300 17,740.00 2,750.00
5/5/2022 8067 30364 14,760.00 2,750.00
5/5/2022 8068 30294 15,840.00 2,750.00
5/5/2022 8069 30810 16,430.00 2,750.00
5/5/2022 8070 30562 14,400.00 2,750.00
5/5/2022 8071 30358 16,760.00 2,750.00
5/5/2022 8072 30153 14,470.00 2,750.00
5/5/2022 8073 30275 16,290.00 2,750.00
5/5/2022 8074 30807 12,500.00 2,750.00
5/5/2022 8075 30299 18,240.00 2,750.00
5/5/2022 8076 30273 15,880.00 2,750.00
5/5/2022 8077 30296 14,990.00 2,750.00
5/5/2022 8078 30365 15,780.00 2,750.00
5/5/2022 8079 30303 17,060.00 2,750.00
5/5/2022 8081 30817 11,190.00 2,750.00
5/5/2022 8083 30373 14,550.00 2,750.00
5/5/2022 8084 30184 11,820.00 2,750.00
5/5/2022 8085 30493 15,630.00 2,750.00
5/5/2022 8086 3096 13,720.00 2,750.00
5/5/2022 8088 30164 11,850.00 2,750.00
5/5/2022 8089 30300 15,690.00 2,750.00
5/5/2022 8090 30297 15,440.00 2,750.00
5/5/2022 8091 30358 17,950.00 2,750.00
5/5/2022 8092 30113 10,960.00 2,750.00
5/5/2022 8093 30443 18,980.00 2,750.00
5/5/2022 8094 30335 16,210.00 2,750.00
5/5/2022 8095 30386 18,270.00 2,750.00
5/5/2022 8096 30364 17,120.00 2,750.00
5/5/2022 8097 30275 19,750.00 2,750.00
5/5/2022 8098 30294 16,210.00 2,750.00
5/5/2022 8099 30810 14,550.00 2,750.00
5/5/2022 8100 30153 15,040.00 2,750.00
5/5/2022 8101 30365 17,830.00 2,750.00
5/5/2022 8102 30273 20,700.00 2,750.00
5/5/2022 8103 30299 17,770.00 2,750.00
5/5/2022 8104 30300 18,540.00 2,750.00
5/5/2022 8105 30144 13,630.00 2,750.00
5/5/2022 8106 30364 19,460.00 2,750.00
5/5/2022 8107 30300 16,120.00 2,750.00
5/5/2022 8108 30184 10,740.00 2,750.00
5/5/2022 8109 30443 18,010.00 2,750.00
5/5/2022 8110 30106 13,380.00 2,750.00
5/5/2022 8111 30275 20,100.00 2,750.00
5/5/2022 8112 30358 20,680.00 2,750.00
5/5/2022 8113 30373 16,120.00 2,750.00
5/5/2022 8114 30448 15,530.00 2,750.00
5/5/2022 8115 30386 12,740.00 2,750.00
5/5/2022 8116 30296 17,490.00 2,750.00
5/5/2022 8117 3096 13,790.00 2,750.00
5/5/2022 8118 30817 13,250.00 2,750.00
5/5/2022 8119 30365 17,480.00 2,750.00
5/5/2022 8120 30274 19,830.00 2,750.00
5/5/2022 8121 30273 16,140.00 2,750.00
5/5/2022 8122 30303 18,650.00 2,750.00
5/5/2022 8123 30164 10,730.00 2,750.00
5/5/2022 8124 30113 10,280.00 2,750.00
5/5/2022 8125 30299 19,110.00 2,750.00
5/5/2022 8126 30493 17,350.00 2,750.00
5/5/2022 8127 30125 15,750.00 2,750.00
5/5/2022 8128 30810 14,950.00 2,750.00
5/5/2022 8129 30335 14,980.00 2,750.00
5/5/2022 8130 30297 18,440.00 2,750.00
5/5/2022 8131 30300 15,830.00 2,750.00
5/5/2022 8132 30474 22,100.00 2,750.00
5/5/2022 8133 30153 13,590.00 2,750.00
5/5/2022 8134 30364 20,960.00 2,750.00
5/5/2022 8135 30275 17,230.00 2,750.00
5/5/2022 8136 30807 12,550.00 2,750.00
5/5/2022 8137 30294 16,840.00 2,750.00
5/5/2022 8138 30562 13,560.00 2,750.00
5/5/2022 8139 30184 10,700.00 2,750.00
5/5/2022 8140 30443 15,050.00 2,750.00
5/5/2022 8141 30448 18,170.00 2,750.00
5/5/2022 8142 30350 21,460.00 2,750.00
5/5/2022 8143 30296 17,450.00 2,750.00
5/5/2022 8144 30373 17,050.00 2,750.00
5/5/2022 8145 30817 13,290.00 2,750.00
5/5/2022 8146 30365 18,230.00 2,750.00
5/5/2022 8147 30184 9,910.00 2,750.00
5/5/2022 8148 30296 17,510.00 2,750.00
5/5/2022 8149 30274 15,260.00 2,750.00
5/5/2022 8150 30365 17,360.00 2,750.00
5/5/2022 8151 30273 16,500.00 2,750.00
5/5/2022 8152 30300 15,340.00 2,750.00
5/5/2022 8153 30303 16,580.00 2,750.00
5/5/2022 8154 30299 19,980.00 2,750.00
5/5/2022 8155 30294 15,380.00 2,750.00
5/5/2022 8156 30275 18,050.00 2,750.00
5/5/2022 8157 30184 11,100.00 2,750.00
5/5/2022 8158 30296 18,940.00 2,750.00
5/5/2022 8159 30274 14,540.00 2,750.00
5/6/2022 8160 30335 17,200.00 2,750.00
5/6/2022 8161 30365 16,650.00 2,750.00
5/6/2022 8162 30273 17,510.00 2,750.00
5/6/2022 8163 30299 18,700.00 2,750.00
5/6/2022 8164 30300 15,710.00 2,750.00
5/6/2022 8165 30303 21,820.00 2,750.00
5/6/2022 8166 30296 18,250.00 2,750.00
5/6/2022 8167 30474 14,560.00 2,750.00
5/6/2022 8168 30275 22,170.00 2,750.00
5/6/2022 8169 30443 20,190.00 2,750.00
5/6/2022 8170 30817 15,520.00 2,750.00
5/6/2022 8171 30448 17,340.00 2,750.00
5/6/2022 8172 30386 14,840.00 2,750.00
5/6/2022 8173 30125 17,620.00 2,750.00
5/6/2022 8174 30810 23,330.00 2,750.00
5/6/2022 8175 30144 15,030.00 2,750.00
5/6/2022 8176 30373 15,300.00 2,750.00
5/6/2022 8177 30184 9,450.00 2,750.00
5/6/2022 8178 30335 16,290.00 2,750.00
5/6/2022 8179 30474 17,700.00 2,750.00
5/6/2022 8180 30358 18,520.00 2,750.00
5/6/2022 8181 30297 17,280.00 2,750.00
5/6/2022 8182 30360 19,620.00 2,750.00
5/6/2022 8183 30106 16,230.00 2,750.00
5/6/2022 8184 30562 13,180.00 2,750.00
5/6/2022 8185 30153 16,210.00 2,750.00
5/6/2022 8186 30807 12,810.00 2,750.00
5/6/2022 8187 30274 18,290.00 2,750.00
5/6/2022 8188 30810 15,920.00 2,750.00
5/6/2022 8189 30125 16,550.00 2,750.00
5/6/2022 8190 30335 16,890.00 2,750.00
5/6/2022 8191 30144 16,130.00 2,750.00
5/6/2022 8192 30303 21,600.00 2,750.00
5/6/2022 8194 30493 13,400.00 2,750.00
5/6/2022 8196 2,750.00
5/6/2022 8197 2,750.00
5/6/2022 8198 30273 18,340.00 2,750.00
5/6/2022 8199 30296 19,330.00 2,750.00
5/6/2022 8201 30299 17,960.00 2,750.00
5/6/2022 8202 30358 15,560.00 2,750.00
5/6/2022 8203 30184 9,620.00 2,750.00
5/6/2022 8204 30807 14,350.00 2,750.00
5/6/2022 8205 30562 13,710.00 2,750.00
5/6/2022 8206 30448 15,560.00 2,750.00
5/6/2022 8207 30443 16,560.00 2,750.00
5/6/2022 8208 30817 14,180.00 2,750.00
5/6/2022 8209 30113 11,920.00 2,750.00
5/7/2022 8212 30300 14,390.00 2,750.00
5/7/2022 8213 30299 14,070.00 2,750.00
5/7/2022 8214 30303 19,870.00 2,750.00
5/7/2022 8215 30275 22,320.00 2,750.00
5/7/2022 8216 30365 16,250.00 2,750.00
5/7/2022 8217 30386 13,060.00 2,750.00
5/7/2022 8218 30296 16,910.00 2,750.00
5/7/2022 8219 30438 11,830.00 2,750.00
5/7/2022 8220 30810 16,090.00 2,750.00
5/7/2022 8221 30445 17,120.00 2,750.00
5/7/2022 8222 30360 17,320.00 2,750.00
5/7/2022 8223 30184 11,170.00 2,750.00
5/7/2022 8224 30807 16,480.00 2,750.00
5/7/2022 8225 30448 14,150.00 2,750.00
5/7/2022 8226 2,750.00
5/7/2022 8227 30300 15,740.00 2,750.00
5/7/2022 8228 30273 20,640.00 2,750.00
5/7/2022 8229 30358 21,760.00 2,750.00
5/7/2022 8230 30810 15,690.00 2,750.00
5/7/2022 8231 30303 17,760.00 2,750.00
5/7/2022 8232 30274 20,510.00 2,750.00
5/7/2022 8233 30106 12,810.00 2,750.00
5/7/2022 8234 30365 18,680.00 2,750.00
5/7/2022 8235 30294 16,570.00 2,750.00
5/7/2022 8236 30275 16,560.00 2,750.00
5/7/2022 8237 2,750.00
5/7/2022 8238 30483 12,670.00 2,750.00
5/7/2022 8239 30299 15,730.00 2,750.00
5/7/2022 8240 30164 14,860.00 2,750.00
5/7/2022 8241 30296 15,780.00 2,750.00
5/7/2022 8242 30817 14,420.00 2,750.00
5/7/2022 8243 30113 14,200.00 2,750.00
5/7/2022 8244 30386 17,410.00 2,750.00
5/7/2022 8246 30125 14,740.00 2,750.00
5/7/2022 8248 30483 13,390.00 2,750.00
5/7/2022 8249 30274 21,150.00 2,750.00
5/7/2022 8250 30807 13,660.00 2,750.00
5/7/2022 8251 30184 11,700.00 2,750.00
5/7/2022 8252 30360 17,880.00 2,750.00
5/7/2022 8253 30106 12,820.00 2,750.00
5/7/2022 8254 30300 15,260.00 2,750.00
5/7/2022 8255 30810 16,890.00 2,750.00
5/7/2022 8256 30365 18,920.00 2,750.00
5/7/2022 8257 30275 18,820.00 2,750.00
5/7/2022 8258 30294 19,000.00 2,750.00
5/7/2022 8259 30303 17,280.00 2,750.00
5/7/2022 8260 30364 22,380.00 2,750.00
5/7/2022 8261 30448 14,970.00 2,750.00
5/7/2022 8262 30164 15,280.00 2,750.00
5/7/2022 8263 30273 19,830.00 2,750.00
5/7/2022 8264 30153 15,150.00 2,750.00
5/7/2022 8265 30299 18,830.00 2,750.00
5/7/2022 8266 30483 10,370.00 2,750.00
5/7/2022 8267 30125 17,660.00 2,750.00
5/7/2022 8268 30443 17,440.00 2,750.00
5/7/2022 8269 30817 16,270.00 2,750.00
5/7/2022 8270 30358 18,980.00 2,750.00
5/7/2022 8271 30274 16,860.00 2,750.00
5/7/2022 8272 30296 17,620.00 2,750.00
5/7/2022 8273 30493 17,410.00 2,750.00
5/7/2022 8274 30810 17,360.00 2,750.00
5/7/2022 8275 30365 12,950.00 2,750.00
5/7/2022 8276 30275 18,460.00 2,750.00
5/7/2022 8277 30386 16,080.00 2,750.00
5/7/2022 8278 30300 16,640.00 2,750.00
5/7/2022 8279 30562 16,140.00 2,750.00
5/7/2022 8280 30483 11,400.00 2,750.00
5/7/2022 8281 30125 15,230.00 2,750.00
5/7/2022 8282 30273 19,760.00 2,750.00
5/7/2022 8283 30294 19,280.00 2,750.00
5/7/2022 8284 30360 18,140.00 2,750.00
5/7/2022 8285 30443 15,270.00 2,750.00
5/7/2022 8286 30358 20,260.00 2,750.00
5/7/2022 8287 30299 20,990.00 2,750.00
5/7/2022 8288 30184 11,730.00 2,750.00
5/7/2022 8289 30364 24,860.00 2,750.00
5/7/2022 8290 30275 19,370.00 2,750.00
5/7/2022 8291 30365 19,140.00 2,750.00
5/7/2022 8292 30125 15,910.00 2,750.00
5/7/2022 8293 30483 12,610.00 2,750.00
5/7/2022 8294 30273 17,850.00 2,750.00
5/7/2022 8295 30360 16,330.00 2,750.00
5/7/2022 8296 30125 14,350.00 2,750.00
5/7/2022 8297 30483 12,760.00 2,750.00
5/7/2022 8298 30294 20,550.00 2,750.00
5/7/2022 8299 30358 19,710.00 2,750.00
5/7/2022 8300 30386 13,260.00 2,750.00
5/7/2022 8301 30300 14,900.00 2,750.00
5/7/2022 8302 30364 19,940.00 2,750.00
5/7/2022 8303 30275 18,820.00 2,750.00
5/7/2022 8304 30365 15,560.00 2,750.00
5/7/2022 8305 30443 16,570.00 2,750.00
5/7/2022 8306 30807 15,640.00 2,750.00
5/7/2022 8307 30133 13,770.00 2,750.00
5/7/2022 8308 30274 17,980.00 2,750.00
5/7/2022 8309 30386 19,080.00 2,750.00
5/7/2022 8310 30303 25,060.00 2,750.00
5/7/2022 8311 30296 17,170.00 2,750.00
5/7/2022 8312 30299 17,020.00 2,750.00
5/7/2022 8313 30483 10,150.00 2,750.00
5/7/2022 8314 30125 15,890.00 2,750.00
5/7/2022 8315 30273 19,380.00 2,750.00
5/7/2022 8316 30493 16,890.00 2,750.00
5/7/2022 8317 30448 16,210.00 2,750.00
5/7/2022 8318 30817 14,840.00 2,750.00
5/7/2022 8319 30173 13,430.00 2,750.00
5/7/2022 8320 30294 16,400.00 2,750.00
5/7/2022 8321 30358 16,890.00 2,750.00
5/7/2022 8322 30360 17,110.00 2,750.00
5/7/2022 8323 30184 10,970.00 2,750.00
5/7/2022 8324 30364 17,120.00 2,750.00
5/7/2022 8325 30483 10,820.00 2,750.00
5/7/2022 8326 30300 15,750.00 2,750.00
5/7/2022 8327 30365 16,820.00 2,750.00
5/7/2022 8328 30275 17,450.00 2,750.00
5/7/2022 8329 30445 13,660.00 2,750.00
5/7/2022 8330 30810 15,680.00 2,750.00
5/7/2022 8331 30296 17,320.00 2,750.00
5/7/2022 8332 30358 15,710.00 2,750.00
5/7/2022 8333 30125 13,840.00 2,750.00
5/7/2022 8334 30273 18,590.00 2,750.00
5/7/2022 8335 30360 15,720.00 2,750.00
5/7/2022 8336 2,750.00
5/7/2022 8337 30448 22,230.00 2,750.00
5/7/2022 8338 30164 11,000.00 2,750.00
5/7/2022 8339 30807 15,050.00 2,750.00
5/7/2022 8340 30106 10,920.00 2,750.00
5/7/2022 8341 30493 15,580.00 2,750.00
5/7/2022 8342 30443 15,480.00 2,750.00
5/7/2022 8343 30274 16,650.00 2,750.00
5/7/2022 8344 30817 15,650.00 2,750.00
5/7/2022 8345 30294 17,670.00 2,750.00
5/8/2022 8346 30303 12,490.00 2,750.00
5/8/2022 8347 30483 12,390.00 2,750.00
5/8/2022 8348 30275 17,230.00 2,750.00
5/8/2022 8349 30273 14,670.00 2,750.00
5/8/2022 8350 30358 16,160.00 2,750.00
5/8/2022 8351 30365 16,310.00 2,750.00
5/8/2022 8352 30386 14,390.00 2,750.00
5/8/2022 8353 30299 16,760.00 2,750.00
5/8/2022 8354 30807 14,090.00 2,750.00
5/8/2022 8355 2,750.00
5/8/2022 8356 30443 16,160.00 2,750.00
5/8/2022 8357 30360 15,140.00 2,750.00
5/8/2022 8358 30445 14,220.00 2,750.00
5/8/2022 8359 30297 16,850.00 2,750.00
5/8/2022 8360 30296 19,280.00 2,750.00
5/8/2022 8361 30173 14,520.00 2,750.00
5/8/2022 8362 30364 11,120.00 2,750.00
5/8/2022 8363 30106 15,980.00 2,750.00
5/8/2022 8364 30184 10,740.00 2,750.00
5/8/2022 8365 30817 15,760.00 2,750.00
5/8/2022 8366 30448 15,920.00 2,750.00
5/8/2022 8367 30438 17,050.00 2,750.00
5/8/2022 8368 30300 24,810.00 2,750.00
5/8/2022 8369 30303 17,000.00 2,750.00
5/8/2022 8370 30275 18,030.00 2,750.00
5/8/2022 8371 30358 187,000.00 2,750.00
5/8/2022 8372 30273 20,930.00 2,750.00
5/8/2022 8373 30807 15,580.00 2,750.00
5/8/2022 8374 30365 17,150.00 2,750.00
5/8/2022 8375 30443 16,460.00 2,750.00
5/8/2022 8376 30448 17,170.00 2,750.00
5/8/2022 8377 30297 17,700.00 2,750.00
5/8/2022 8378 30438 14,210.00 2,750.00
5/8/2022 8380 30173 15,390.00 2,750.00
5/8/2022 8382 30364 19,310.00 2,750.00
5/8/2022 8383 30386 12,780.00 2,750.00
5/8/2022 8384 30358 20,620.00 2,750.00
5/8/2022 8385 30817 14,310.00 2,750.00
5/8/2022 8386 30274 19,710.00 2,750.00
5/8/2022 8387 30445 12,750.00 2,750.00
5/8/2022 8388 30360 17,400.00 2,750.00
5/8/2022 8389 30807 14,310.00 2,750.00
5/8/2022 8390 30275 17,050.00 2,750.00
5/8/2022 8391 30300 14,640.00 2,750.00
5/8/2022 8392 30303 17,270.00 2,750.00
5/8/2022 8393 30173 14,380.00 2,750.00
5/8/2022 8394 30133 14,340.00 2,750.00
5/8/2022 8395 30106 12,920.00 2,750.00
5/8/2022 8396 30438 15,420.00 2,750.00
5/8/2022 8397 30817 11,460.00 2,750.00
5/8/2022 8398 30273 17,690.00 2,750.00
5/8/2022 8399 30493 16,820.00 2,750.00
5/8/2022 8400 30364 16,450.00 2,750.00
5/8/2022 8401 30299 15,010.00 2,750.00
5/8/2022 8402 30296 18,740.00 2,750.00
5/8/2022 8403 30438 13,240.00 2,750.00
5/8/2022 8404 30807 12,880.00 2,750.00
5/8/2022 8405 30817 11,880.00 2,750.00
5/8/2022 8406 30365 17,550.00 2,750.00
5/8/2022 8407 30106 13,870.00 2,750.00
5/8/2022 8408 30173 17,390.00 2,750.00
5/8/2022 8409 30294 20,020.00 2,750.00
5/8/2022 8410 30297 15,790.00 2,750.00
5/8/2022 8411 30438 15,570.00 2,750.00
5/8/2022 8412 30133 9,670.00 2,750.00
5/8/2022 8413 30106 12,610.00 2,750.00
5/8/2022 8414 30173 11,460.00 2,750.00
5/8/2022 8415 30275 15,870.00 2,750.00
5/8/2022 8416 30300 14,880.00 2,750.00
5/8/2022 8417 30303 16,330.00 2,750.00
5/8/2022 8418 30273 19,230.00 2,750.00
5/8/2022 8419 30122 14,390.00 2,750.00
5/8/2022 8420 30807 14,400.00 2,750.00
5/8/2022 8421 30299 16,360.00 2,750.00
5/8/2022 8422 30358 17,450.00 2,750.00
5/8/2022 8423 30365 16,330.00 2,750.00
5/8/2022 8424 30274 18,260.00 2,750.00
5/9/2022 8425 30122 13,670.00 2,750.00
5/9/2022 8426 30483 11,160.00 2,750.00
5/9/2022 8427 30275 16,570.00 2,750.00
5/9/2022 8428 30303 13,960.00 2,750.00
5/9/2022 8429 30300 15,480.00 2,750.00
5/9/2022 8430 30294 15,840.00 2,750.00
5/9/2022 8431 30133 9,280.00 2,750.00
5/9/2022 8432 30373 15,550.00 2,750.00
5/9/2022 8433 30296 14,780.00 2,750.00
5/9/2022 8434 30299 17,040.00 2,750.00
5/9/2022 8435 30273 15,050.00 2,750.00
5/9/2022 8436 30358 18,270.00 2,750.00
5/9/2022 8437 30106 14,010.00 2,750.00
5/9/2022 8438 30438 12,380.00 2,750.00
5/9/2022 8439 30365 16,830.00 2,750.00
5/9/2022 8440 30445 15,160.00 2,750.00
5/9/2022 8441 30360 18,310.00 2,750.00
5/9/2022 8442 30386 12,210.00 2,750.00
5/9/2022 8443 30493 15,560.00 2,750.00
5/9/2022 8444 30274 20,360.00 2,750.00
5/9/2022 8445 30443 16,670.00 2,750.00
5/9/2022 8446 30279 20,010.00 2,750.00
5/9/2022 8447 30364 16,850.00 2,750.00
5/9/2022 8448 30173 15,560.00 2,750.00
5/9/2022 8449 30807 12,310.00 2,750.00
5/9/2022 8450 30296 17,110.00 2,750.00
5/9/2022 8451 30294 17,620.00 2,750.00
5/9/2022 8452 30275 15,730.00 2,750.00
5/9/2022 8453 30133 10,320.00 2,750.00
5/9/2022 8454 30438 16,320.00 2,750.00
5/9/2022 8455 30474 16,060.00 2,750.00
5/9/2022 8456 30817 13,840.00 2,750.00
5/9/2022 8457 30303 17,110.00 2,750.00
5/9/2022 8458 30300 17,480.00 2,750.00
5/9/2022 8459 30299 15,900.00 2,750.00
5/9/2022 8460 30106 16,380.00 2,750.00
5/9/2022 8461 30274 20,530.00 2,750.00
5/9/2022 8462 30358 21,500.00 2,750.00
5/9/2022 8463 30273 19,480.00 2,750.00
5/9/2022 8464 30297 21,900.00 2,750.00
5/9/2022 8465 30365 18,780.00 2,750.00
5/9/2022 8466 30364 17,590.00 2,750.00
5/9/2022 8467 30443 20,750.00 2,750.00
5/9/2022 8468 30807 17,840.00 2,750.00
5/9/2022 8469 30445 16,640.00 2,750.00
5/9/2022 8470 30360 20,860.00 2,750.00
5/9/2022 8471 30386 16,380.00 2,750.00
5/9/2022 8472 30133 11,090.00 2,750.00
5/9/2022 8473 30296 18,670.00 2,750.00
5/9/2022 8474 30303 17,850.00 2,750.00
5/9/2022 8475 30300 17,910.00 2,750.00
5/9/2022 8476 30294 18,870.00 2,750.00
5/9/2022 8477 30299 20,500.00 2,750.00
5/9/2022 8478 30274 20,230.00 2,750.00
5/9/2022 8479 30364 20,270.00 2,750.00
5/9/2022 8480 30365 19,500.00 2,750.00
5/9/2022 8481 30106 16,870.00 2,750.00
5/9/2022 8482 30297 21,270.00 2,750.00
5/9/2022 8483 30443 16,960.00 2,750.00
5/9/2022 8484 30296 21,800.00 2,750.00
5/9/2022 8485 30807 13,850.00 2,750.00
5/9/2022 8486 30358 19,000.00 2,750.00
5/9/2022 8487 30386 13,380.00 2,750.00
5/9/2022 8488 30360 19,230.00 2,750.00
5/9/2022 8489 30445 19,560.00 2,750.00
5/9/2022 8490 30274 20,640.00 2,750.00
5/9/2022 8491 30303 14,640.00 2,750.00
5/9/2022 8492 30300 16,390.00 2,750.00
5/9/2022 8493 30299 16,230.00 2,750.00
5/9/2022 8494 30364 16,470.00 2,750.00
5/9/2022 8495 30273 17,160.00 2,750.00
5/9/2022 8496 30294 14,030.00 2,750.00
5/9/2022 8497 30297 20,190.00 2,750.00
5/9/2022 8498 30365 17,340.00 2,750.00
5/9/2022 8499 30817 10,010.00 2,750.00
5/9/2022 8500 30274 21,180.00 2,750.00
5/9/2022 8501 30364 16,520.00 2,750.00
5/9/2022 8502 30303 16,200.00 2,750.00
5/9/2022 8503 30300 13,460.00 2,750.00
5/9/2022 8504 30299 17,550.00 2,750.00
5/9/2022 8505 30173 15,690.00 2,750.00
5/9/2022 8506 30294 15,500.00 2,750.00
5/9/2022 8507 30273 17,530.00 2,750.00
5/9/2022 8508 30296 17,170.00 2,750.00
5/9/2022 8509 30297 20,830.00 2,750.00
5/9/2022 8510 30360 21,510.00 2,750.00
5/9/2022 8511 30365 19,120.00 2,750.00
5/9/2022 8512 30807 15,730.00 2,750.00
5/9/2022 8513 30445 14,610.00 2,750.00
5/9/2022 8514 30443 14,860.00 2,750.00
5/9/2022 8515 30350 16,200.00 2,750.00
5/9/2022 8516 30817 10,880.00 2,750.00
5/9/2022 8517 30274 17,240.00 2,750.00
5/9/2022 8518 30364 12,800.00 2,750.00
5/9/2022 8519 30386 11,680.00 2,750.00
5/9/2022 8520 30360 19,100.00 2,750.00
5/9/2022 8521 30133 6,910.00 2,750.00
5/9/2022 8522 30173 14,880.00 2,750.00
5/9/2022 8523 30365 17,360.00 2,750.00
5/9/2022 8524 30303 18,480.00 2,750.00
5/9/2022 8525 30300 16,250.00 2,750.00
5/9/2022 8526 30297 16,730.00 2,750.00
5/9/2022 8527 30299 17,520.00 2,750.00
5/9/2022 8528 30273 18,900.00 2,750.00
5/9/2022 8529 30296 15,530.00 2,750.00
5/9/2022 8530 30294 17,450.00 2,750.00
5/10/2022 8531 30364 11,420.00 2,750.00
5/10/2022 8532 30365 14,080.00 2,750.00
5/10/2022 8533 30445 12,630.00 2,750.00
5/10/2022 8534 30300 16,070.00 2,750.00
5/10/2022 8535 30273 16,990.00 2,750.00
5/10/2022 8536 30386 12,670.00 2,750.00
5/10/2022 8537 30296 17,320.00 2,750.00
5/10/2022 8538 30358 15,190.00 2,750.00
5/10/2022 8539 30274 15,160.00 2,750.00
5/10/2022 8540 30297 15,460.00 2,750.00
5/10/2022 8541 30299 17,150.00 2,750.00
5/10/2022 8542 30443 13,180.00 2,750.00
5/10/2022 8543 30294 16,700.00 2,750.00
5/10/2022 8544 30275 16,500.00 2,750.00
5/10/2022 8545 30360 17,360.00 2,750.00
5/10/2022 8546 30365 18,620.00 2,750.00
5/10/2022 8547 30133 6,890.00 2,750.00
5/10/2022 8548 30445 17,810.00 2,750.00
5/10/2022 8549 30386 13,080.00 2,750.00
5/10/2022 8550 30358 20,950.00 2,750.00
5/10/2022 8551 30296 19,480.00 2,750.00
5/10/2022 8552 30274 17,710.00 2,750.00
5/10/2022 8553 30273 17,820.00 2,750.00
5/10/2022 8554 30275 13,750.00 2,750.00
5/10/2022 8555 30299 16,930.00 2,750.00
5/10/2022 8556 30364 13,870.00 2,750.00
5/10/2022 8557 30294 14,060.00 2,750.00
5/10/2022 8558 30300 15,760.00 2,750.00
5/10/2022 8559 30360 18,130.00 2,750.00
5/10/2022 8560 30445 16,580.00 2,750.00
5/10/2022 8561 30365 20,560.00 2,750.00
5/10/2022 8562 30106 15,910.00 2,750.00
5/10/2022 8563 30386 15,090.00 2,750.00
5/10/2022 8564 30133 13,630.00 2,750.00
5/10/2022 8565 30438 16,120.00 2,750.00
5/10/2022 8566 30296 18,880.00 2,750.00
5/10/2022 8567 30297 17,740.00 2,750.00
5/10/2022 8568 30274 16,720.00 2,750.00
5/10/2022 8569 30173 16,060.00 2,750.00
5/10/2022 8570 30358 19,550.00 2,750.00
5/10/2022 8571 30365 13,580.00 2,750.00
5/10/2022 8572 30364 18,910.00 2,750.00
5/10/2022 8573 30273 18,180.00 2,750.00
5/10/2022 8574 30294 14,670.00 2,750.00
5/10/2022 8575 30817 14,050.00 2,750.00
5/10/2022 8576 30358 20,850.00 2,750.00
5/10/2022 8577 30300 18,960.00 2,750.00
5/10/2022 8578 30296 17,240.00 2,750.00
5/10/2022 8579 30360 16,150.00 2,750.00
5/10/2022 8580 30445 18,710.00 2,750.00
5/10/2022 8581 30173 17,230.00 2,750.00
5/10/2022 8582 30274 17,360.00 2,750.00
5/10/2022 8583 30297 20,970.00 2,750.00
5/10/2022 8584 30106 14,840.00 2,750.00
5/10/2022 8585 30807 19,280.00 2,750.00
5/10/2022 8586 30438 16,160.00 2,750.00
5/10/2022 8587 30493 24,120.00 2,750.00
5/10/2022 8588 30364 19,580.00 2,750.00
5/10/2022 8589 30365 16,930.00 2,750.00
5/10/2022 8590 30164 11,170.00 2,750.00
5/10/2022 8591 30275 13,500.00 2,750.00
5/10/2022 8592 30275 14,180.00 2,750.00
5/10/2022 8593 30273 14,620.00 2,750.00
5/10/2022 8594 30817 13,840.00 2,750.00
5/10/2022 8595 30303 11,460.00 2,750.00
5/10/2022 8596 30448 14,370.00 2,750.00
5/10/2022 8597 30300 17,610.00 2,750.00
5/10/2022 8598 30358 21,190.00 2,750.00
5/10/2022 8599 30443 19,150.00 2,750.00
5/10/2022 8600 30294 13,300.00 2,750.00
5/10/2022 8601 30274 17,200.00 2,750.00
5/10/2022 8602 30360 20,700.00 2,750.00
5/10/2022 8603 30445 15,250.00 2,750.00
5/10/2022 8604 30297 20,060.00 2,750.00
5/10/2022 8605 30364 18,580.00 2,750.00
5/10/2022 8606 30296 14,270.00 2,750.00
5/10/2022 8607 30365 15,200.00 2,750.00
5/10/2022 8608 30275 13,460.00 2,750.00
5/10/2022 8609 30493 15,650.00 2,750.00
5/10/2022 8610 30817 14,760.00 2,750.00
5/10/2022 8611 30303 14,230.00 2,750.00
5/10/2022 8612 30300 16,130.00 2,750.00
5/10/2022 8613 30273 18,460.00 2,750.00
5/10/2022 8614 30294 12,890.00 2,750.00
5/10/2022 8615 30296 18,980.00 2,750.00
5/10/2022 8616 30300 890.00 2,750.00
5/10/2022 8617 30275 15,430.00 2,750.00
5/10/2022 8618 30299 17,250.00 2,750.00
5/10/2022 8619 30365 15,770.00 2,750.00
5/10/2022 8620 30275 16,080.00 2,750.00
5/10/2022 8621 30273 16,980.00 2,750.00
5/10/2022 8622 30294 14,430.00 2,750.00
5/10/2022 8623 30296 17,860.00 2,750.00
5/11/2022 8624 30275 21,800.00 2,750.00
5/11/2022 8625 30303 15,010.00 2,750.00
5/11/2022 8626 30365 18,080.00 2,750.00
5/11/2022 8627 30358 22,300.00 2,750.00
5/11/2022 8628 30300 18,800.00 2,750.00
5/11/2022 8629 30445 18,510.00 2,750.00
5/11/2022 8630 30273 13,180.00 2,750.00
5/11/2022 8631 30296 18,160.00 2,750.00
5/11/2022 8632 30360 21,180.00 2,750.00
5/11/2022 8633 30448 24,520.00 2,750.00
5/11/2022 8634 30817 16,850.00 2,750.00
5/11/2022 8635 30297 21,440.00 2,750.00
5/11/2022 8636 30364 16,730.00 2,750.00
5/11/2022 8637 30173 17,880.00 2,750.00
5/11/2022 8638 30274 16,170.00 2,750.00
5/11/2022 8639 18,620.00 2,750.00
5/11/2022 8640 30438 13,480.00 2,750.00
5/11/2022 8641 30365 17,040.00 2,750.00
5/11/2022 8642 30275 16,690.00 2,750.00
5/11/2022 8643 30303 14,210.00 2,750.00
5/11/2022 8644 30358 19,500.00 2,750.00
5/11/2022 8645 30448 17,260.00 2,750.00
5/11/2022 8646 30273 18,010.00 2,750.00
5/11/2022 8647 30364 23,730.00 2,750.00
5/11/2022 8648 30300 19,440.00 2,750.00
5/11/2022 8649 30299 19,650.00 2,750.00
5/11/2022 8650 30360 18,080.00 2,750.00
5/11/2022 8651 30296 17,440.00 2,750.00
5/11/2022 8652 30445 19,000.00 2,750.00
5/11/2022 8653 30297 20,450.00 2,750.00
5/11/2022 8654 30807 13,060.00 2,750.00
5/11/2022 8655 30817 16,870.00 2,750.00
5/11/2022 8656 30173 19,140.00 2,750.00
5/11/2022 8657 30274 17,470.00 2,750.00
5/11/2022 8658 30386 14,210.00 2,750.00
5/11/2022 8659 30438 17,210.00 2,750.00
5/11/2022 8660 30365 16,360.00 2,750.00
5/11/2022 8661 30303 14,410.00 2,750.00
5/11/2022 8662 30358 22,090.00 2,750.00
5/11/2022 8663 30448 15,610.00 2,750.00
5/11/2022 8664 30106 14,450.00 2,750.00
5/11/2022 8665 30294 11,560.00 2,750.00
5/11/2022 8666 30273 17,020.00 2,750.00
5/11/2022 8667 30364 17,170.00 2,750.00
5/11/2022 8668 30443 17,050.00 2,750.00
5/11/2022 8669 30299 16,880.00 2,750.00
5/11/2022 8670 30297 18,740.00 2,750.00
5/11/2022 8671 30386 11,400.00 2,750.00
5/11/2022 8672 30817 14,640.00 2,750.00
5/11/2022 8673 30173 14,080.00 2,750.00
5/11/2022 8674 30365 17,140.00 2,750.00
5/11/2022 8675 30360 15,580.00 2,750.00
5/11/2022 8676 30445 16,940.00 2,750.00
5/11/2022 8677 30303 14,380.00 2,750.00
5/11/2022 8678 30448 15,090.00 2,750.00
5/11/2022 8679 30274 22,940.00 2,750.00
5/11/2022 8680 24,120.00 2,750.00
5/11/2022 8681 30296 18,700.00 2,750.00
5/11/2022 8682 8682 17,550.00 2,750.00
5/11/2022 8683 30358 19,580.00 2,750.00
5/11/2022 8684 30106 11,310.00 2,750.00
5/11/2022 8685 30294 11,300.00 2,750.00
5/11/2022 8686 30297 18,860.00 2,750.00
5/11/2022 8687 30273 17,690.00 2,750.00
5/11/2022 8688 30443 13,060.00 2,750.00
5/11/2022 8689 30365 15,390.00 2,750.00
5/11/2022 8690 30299 15,660.00 2,750.00
5/11/2022 8691 30296 17,030.00 2,750.00
5/11/2022 8692 30364 19,090.00 2,750.00
5/11/2022 8693 30386 11,890.00 2,750.00
5/11/2022 8694 30173 14,810.00 2,750.00
5/11/2022 8695 30817 12,000.00 2,750.00
5/11/2022 8696 30106 9,830.00 2,750.00
5/11/2022 8697 30303 16,120.00 2,750.00
5/11/2022 8698 30365 14,750.00 2,750.00
5/11/2022 8699 30294 12,660.00 2,750.00
5/11/2022 8700 30273 17,740.00 2,750.00
5/11/2022 8701 30275 17,220.00 2,750.00
5/11/2022 8702 30299 16,790.00 2,750.00
5/11/2022 8703 30296 17,410.00 2,750.00
5/11/2022 8704 30303 14,480.00 2,750.00
5/11/2022 8705 30365 15,300.00 2,750.00
5/11/2022 8706 30294 14,490.00 2,750.00
5/11/2022 8707 30273 16,750.00 2,750.00
5/11/2022 8708 30296 16,030.00 2,750.00
5/11/2022 8709 30299 19,800.00 2,750.00
5/11/2022 8710 30303 16,180.00 2,750.00
5/11/2022 8711 30275 17,950.00 2,750.00
12/05/2022 8712 30360 17,510.00 2,750.00
12/05/2022 8713 30294 13,550.00 2,750.00
12/05/2022 8714 30445 15,450.00 2,750.00
12/05/2022 8715 30299 17,780.00 2,750.00
12/05/2022 8716 30275 20,760.00 2,750.00
12/05/2022 8717 30365 17,530.00 2,750.00
12/05/2022 8718 30296 17,440.00 2,750.00
12/05/2022 8719 30386 21,500.00 2,750.00
12/05/2022 8720 30448 18,730.00 2,750.00
12/05/2022 8721 30493 16,920.00 2,750.00
12/05/2022 8722 30817 12,720.00 2,750.00
12/05/2022 8723 30807 14,760.00 2,750.00
12/05/2022 8724 30443 20,120.00 2,750.00
12/05/2022 8725 30438 13,980.00 2,750.00
12/05/2022 8726 30273 19,090.00 2,750.00
12/05/2022 8727 30358 16,570.00 2,750.00
12/05/2022 8728 30274 21,480.00 2,750.00
12/05/2022 8729 30297 20,690.00 2,750.00
12/05/2022 8730 30493 16,500.00 2,750.00
12/05/2022 8731 30106 17,270.00 2,750.00
12/05/2022 8732 30275 18,960.00 2,750.00
12/05/2022 8733 30299 16,880.00 2,750.00
12/05/2022 8734 30365 14,500.00 2,750.00
12/05/2022 8735 30294 18,340.00 2,750.00
12/05/2022 8736 30360 21,230.00 2,750.00
12/05/2022 8737 30445 17,160.00 2,750.00
12/05/2022 8738 30448 15,700.00 2,750.00
12/05/2022 8739 30386 13,470.00 2,750.00
12/05/2022 8740 19,000.00 2,750.00
12/05/2022 8741 30817 15,400.00 2,750.00
12/05/2022 8742 30273 17,200.00 2,750.00
12/05/2022 8743 30443 18,550.00 2,750.00
12/05/2022 8744 30296 17,680.00 2,750.00
12/05/2022 8745 30438 16,090.00 2,750.00
12/05/2022 8746 30358 21,130.00 2,750.00
12/05/2022 8747 30807 13,240.00 2,750.00
12/05/2022 8748 30299 18,870.00 2,750.00
12/05/2022 8749 30365 13,450.00 2,750.00
12/05/2022 8750 30297 19,870.00 2,750.00
12/05/2022 8751 30106 12,400.00 2,750.00
12/05/2022 8752 30294 14,220.00 2,750.00
12/05/2022 8753 30445 18,240.00 2,750.00
12/05/2022 8754 30448 17,260.00 2,750.00
12/05/2022 8755 30817 11,810.00 2,750.00
12/05/2022 8756 30303 12,550.00 2,750.00
12/05/2022 8757 30358 22,720.00 2,750.00
5/12/2022 8758 30807 14,570.00 2,750.00
5/12/2022 8759 30294 11,890.00 2,750.00
5/12/2022 8760 30448 18,010.00 2,750.00
5/12/2022 8761 30493 12,280.00 2,750.00
5/12/2022 8762 30386 10,360.00 2,750.00
12/05/2022 8763 30817 11,260.00 2,750.00
12/05/2022 8764 30297 21,710.00 2,750.00
12/05/2022 8765 30299 15,450.00 2,750.00
12/05/2022 8766 30360 14,450.00 2,750.00
12/05/2022 8767 30445 18,540.00 2,750.00
12/05/2022 8768 30303 14,830.00 2,750.00
Total 38,167,382.00 6,657,750.00
Volumen (m3) Viajes Material Estac. Destino
7.24 1.00 Bolon 52+070
4.17 1.00 Bolon 52+070
6.10 1.00 Bolon 52+300
7.56 1.00 Bolon 52+300
6.51 1.00 Bolon 52+300
5.54 1.00 Bolon 52+300
7.92 1.00 Bolon 52+300
6.27 1.00 Bolon 52+300
7.44 1.00 Bolon 52+300
9.12 1.00 Bolon 52+300
6.88 1.00 Bolon 52+300
6.72 1.00 Bolon 52+300
7.57 1.00 Bolon 52+300
6.21 1.00 Bolon 52+300
6.96 1.00 Bolon 52+300
7.99 1.00 Bolon 52+300
4.91 1.00 Bolon 52+300
7.26 1.00 Bolon 52+300
6.77 1.00 Bolon 52+300
8.19 1.00 Bolon 52+300
7.01 1.00 Bolon 52+300
4.75 1.00 Bolon 52+300
5.17 1.00 Bolon 52+300
5.15 1.00 Bolon 52+300
6.14 1.00 Bolon 52+300
6.27 1.00 Bolon 52+300
5.97 1.00 Bolon 52+300
6.74 1.00 Bolon 52+300
5.45 1.00 Bolon 52+300
7.88 1.00 Bolon 52+300
6.49 1.00 Bolon 53+000
5.37 1.00 Bolon 53+000
5.17 1.00 Bolon 53+000
6.61 1.00 Bolon 53+000
6.80 1.00 Bolon 53+000
7.60 1.00 Bolon 53+000
6.50 1.00 Bolon 53+000
6.09 1.00 Bolon 53+000
7.51 1.00 Bolon 53+000
6.44 1.00 Bolon 53+000
5.65 1.00 Bolon 53+000
4.85 1.00 Bolon 53+000
5.90 1.00 Bolon 53+000
9.40 1.00 Bolon 53+000
6.14 1.00 Bolon 53+000
5.85 1.00 Bolon 53+000
6.49 1.00 Bolon 53+000
6.58 1.00 Bolon 53+000
7.85 1.00 Bolon 53+000
7.31 1.00 Bolon 53+000
5.78 1.00 Bolon 53+000
7.75 1.00 Bolon 53+000
6.97 1.00 Bolon 53+000
5.06 1.00 Bolon 53+000
6.69 1.00 Bolon 53+000
5.47 1.00 Bolon 53+000
5.87 1.00 Bolon 53+000
6.53 1.00 Bolon 53+000
6.94 1.00 Bolon 53+000
6.10 1.00 Bolon 53+000
3.64 1.00 Bolon 53+000
6.07 1.00 Bolon 53+000
7.35 1.00 Bolon 53+000
4.71 1.00 Bolon 53+000
6.07 1.00 Bolon 53+000
6.23 1.00 Bolon 53+000
8.75 1.00 Bolon 53+000
5.89 1.00 Bolon 53+000
7.16 1.00 Bolon 53+000
6.10 1.00 Bolon 53+000
8.16 1.00 Bolon 53+000
5.97 1.00 Bolon 53+000
7.30 1.00 Bolon 53+000
6.53 1.00 Bolon 53+000
5.91 1.00 Bolon 53+000
6.12 1.00 Bolon 53+000
5.27 1.00 Bolon 53+000
7.69 1.00 Bolon 53+000
4.73 1.00 Bolon 53+000
7.27 1.00 Bolon 53+000
7.29 1.00 Bolon 53+000
7.65 1.00 Bolon 53+000
6.54 1.00 Bolon 53+000
7.73 1.00 Bolon 53+000
6.45 1.00 Bolon 53+000
3.73 1.00 Bolon 53+000
6.48 1.00 Bolon 53+000
6.90 1.00 Bolon 53+000
5.41 1.00 Bolon 53+000
6.30 1.00 Bolon 53+000
6.87 1.00 Bolon 53+000
5.68 1.00 Bolon 53+000
4.49 1.00 Bolon 53+000
8.78 1.00 Bolon 53+000
7.11 1.00 Bolon 53+000
7.45 1.00 Bolon 53+000
7.17 1.00 Bolon 53+000
8.17 1.00 Bolon 53+000
7.04 1.00 Bolon 53+000
4.75 1.00 Bolon 53+000
7.17 1.00 Bolon 53+000
5.12 1.00 Bolon 53+000
5.06 1.00 Bolon 53+000
4.23 1.00 Bolon 53+000
7.86 1.00 Bolon 53+000
7.24 1.00 Bolon 53+000
6.40 1.00 Bolon 53+000
7.95 1.00 Bolon 53+000
6.35 1.00 Bolon 53+000
7.63 1.00 Bolon 53+000
7.24 1.00 Bolon 53+000
5.84 1.00 Bolon 53+000
6.66 1.00 Bolon 53+000
5.44 1.00 Bolon 53+000
7.13 1.00 Bolon 52+070
6.86 1.00 Bolon 52+070
6.36 1.00 Bolon 52+300
6.62 1.00 Bolon 52+300
7.22 1.00 Bolon 52+300
8.20 1.00 Bolon 52+300
6.84 1.00 Bolon 52+300
8.09 1.00 Bolon 52+300
6.08 1.00 Bolon 52+300
7.50 1.00 Bolon 52+300
6.41 1.00 Bolon 52+300
8.17 1.00 Bolon 52+300
8.09 1.00 Bolon 52+300
8.36 1.00 Bolon 52+300
7.73 1.00 Bolon 52+300
10.27 1.00 Bolon 52+300
5.78 1.00 Bolon 52+300
7.93 1.00 Bolon 52+300
6.51 1.00 Bolon 52+300
7.24 1.00 Bolon 52+300
7.13 1.00 Bolon 52+300
7.99 1.00 Bolon 52+300
7.16 1.00 Bolon 52+300
8.00 1.00 Bolon 52+300
8.50 1.00 Bolon 52+300
6.17 1.00 Bolon 52+300
5.97 1.00 Bolon 52+300
7.57 1.00 Bolon 52+300
7.76 1.00 Bolon 52+300
6.53 1.00 Bolon 52+300
7.45 1.00 Bolon 53+000
8.65 1.00 Bolon 53+000
7.06 1.00 Bolon 53+000
7.68 1.00 Bolon 53+000
6.82 1.00 Bolon 53+000
8.39 1.00 Bolon 53+000
7.46 1.00 Bolon 53+000
7.13 1.00 Bolon 53+000
5.22 1.00 Bolon 53+000
7.60 1.00 Bolon 53+000
7.50 1.00 Bolon 53+000
8.53 1.00 Bolon 53+000
6.98 1.00 Bolon 53+000
7.22 1.00 Bolon 53+000
7.02 1.00 Bolon 53+000
7.19 1.00 Bolon 53+000
5.63 1.00 Bolon 53+000
5.81 1.00 Bolon 53+000
8.20 1.00 Bolon 53+000
7.12 1.00 Bolon 53+000
9.35 1.00 Bolon 53+000
9.14 1.00 Bolon 53+000
9.66 1.00 Bolon 53+000
6.20 1.00 Bolon 53+000
7.90 1.00 Bolon 53+000
7.26 1.00 Bolon 53+000
5.68 1.00 Bolon 53+000
9.44 1.00 Bolon 53+000
6.97 1.00 Bolon 53+000
5.21 1.00 Bolon 53+000
5.72 1.00 Bolon 53+000
8.68 1.00 Bolon 53+000
6.95 1.00 Bolon 53+000
8.19 1.00 Bolon 53+000
5.96 1.00 Bolon 53+000
7.52 1.00 Bolon 53+000
7.89 1.00 Bolon 52+070
6.85 1.00 Bolon 52+070
8.73 1.00 Bolon 52+300
7.03 1.00 Bolon 52+300
8.40 1.00 Bolon 52+300
7.61 1.00 Bolon 52+300
4.88 1.00 Bolon 52+300
6.58 1.00 Bolon 52+300
4.63 1.00 Bolon 52+300
8.36 1.00 Bolon 52+300
8.48 1.00 Bolon 52+300
7.31 1.00 Bolon 52+300
8.60 1.00 Bolon 52+300
5.90 1.00 Bolon 52+300
6.70 1.00 Bolon 52+300
7.52 1.00 Bolon 52+300
6.92 1.00 Bolon 52+300
8.97 1.00 Bolon 52+300
7.85 1.00 Bolon 52+300
4.53 1.00 Bolon 52+300
8.08 1.00 Bolon 52+300
7.21 1.00 Bolon 52+300
7.49 1.00 Bolon 52+300
8.64 1.00 Bolon 52+300
9.09 1.00 Bolon 52+300
8.87 1.00 Bolon 52+300
5.10 1.00 Bolon 52+300
6.98 1.00 Bolon 52+300
7.11 1.00 Bolon 52+300
7.79 1.00 Bolon 52+300
7.77 1.00 Bolon 53+000
9.48 1.00 Bolon 53+000
5.45 1.00 Bolon 53+000
6.60 1.00 Bolon 53+000
7.21 1.00 Bolon 53+000
8.29 1.00 Bolon 53+000
8.82 1.00 Bolon 53+000
7.84 1.00 Bolon 53+000
6.59 1.00 Bolon 53+000
6.39 1.00 Bolon 53+000
7.26 1.00 Bolon 53+000
7.08 1.00 Bolon 53+000
7.44 1.00 Bolon 53+000
4.81 1.00 Bolon 53+000
7.81 1.00 Bolon 53+000
7.53 1.00 Bolon 53+000
8.00 1.00 Bolon 53+000
7.93 1.00 Bolon 53+000
5.23 1.00 Bolon 53+000
8.57 1.00 Bolon 53+000
6.51 1.00 Bolon 53+000
6.79 1.00 Bolon 53+000
5.50 1.00 Bolon 53+000
6.52 1.00 Bolon 53+000
7.27 1.00 Bolon 53+000
5.62 1.00 Bolon 53+000
8.27 1.00 Bolon 53+000
6.44 1.00 Bolon 53+000
4.72 1.00 Bolon 53+000
1.32 1.00 Bolon 53+000
6.32 1.00 Bolon 53+000
7.00 1.00 Bolon 53+000
7.27 1.00 Bolon 53+000
6.71 1.00 Bolon 53+000
6.61 1.00 Bolon 53+000
8.53 1.00 Bolon 53+000
6.56 1.00 Bolon 53+000
8.09 1.00 Bolon 53+000
6.69 1.00 Bolon 53+000
7.63 1.00 Bolon 53+000
7.53 1.00 Bolon 53+000
7.09 1.00 Bolon 53+000
6.71 1.00 Bolon 53+000
4.97 1.00 Bolon 53+000
6.99 1.00 Bolon 53+000
6.66 1.00 Bolon 53+000
5.53 1.00 Bolon 53+000
7.61 1.00 Bolon 53+000
6.92 1.00 Bolon 53+000
4.83 1.00 Bolon 53+000
7.13 1.00 Bolon 53+000
8.19 1.00 Bolon 53+000
5.96 1.00 Bolon 53+000
7.66 1.00 Bolon 53+000
7.03 1.00 Bolon 53+000
4.55 1.00 Bolon 53+000
6.28 1.00 Bolon 53+000
6.05 1.00 Bolon 53+000
6.63 1.00 Bolon 53+000
6.96 1.00 Bolon 53+000
5.38 1.00 Bolon 52+070
5.66 1.00 Bolon 52+070
6.74 1.00 Bolon 52+300
5.79 1.00 Bolon 52+300
7.16 1.00 Bolon 52+300
7.04 1.00 Bolon 52+300
5.56 1.00 Bolon 52+300
7.86 1.00 Bolon 52+300
8.48 1.00 Bolon 52+300
7.35 1.00 Bolon 52+300
7.25 1.00 Bolon 52+300
7.05 1.00 Bolon 52+300
7.86 1.00 Bolon 52+300
5.73 1.00 Bolon 52+300
5.34 1.00 Bolon 52+300
5.91 1.00 Bolon 52+300
8.78 1.00 Bolon 52+300
6.30 1.00 Bolon 52+300
8.19 1.00 Bolon 52+300
7.93 1.00 Bolon 52+300
5.72 1.00 Bolon 52+300
7.82 1.00 Bolon 52+300
6.75 1.00 Bolon 52+300
6.82 1.00 Bolon 52+300
4.80 1.00 Bolon 52+300
6.01 1.00 Bolon 52+300
5.92 1.00 Bolon 52+300
7.67 1.00 Bolon 52+300
7.28 1.00 Bolon 52+300
7.47 1.00 Bolon 52+300
4.79 1.00 Bolon 53+000
6.26 1.00 Bolon 53+000
6.55 1.00 Bolon 53+000
7.54 1.00 Bolon 53+000
7.33 1.00 Bolon 53+000
7.78 1.00 Bolon 53+000
6.36 1.00 Bolon 53+000
5.15 1.00 Bolon 53+000
6.53 1.00 Bolon 53+000
6.95 1.00 Bolon 53+000
6.73 1.00 Bolon 53+000
6.80 1.00 Bolon 53+000
7.36 1.00 Bolon 53+000
8.27 1.00 Bolon 53+000
3.84 1.00 Bolon 53+000
7.27 1.00 Bolon 53+000
6.73 1.00 Bolon 53+000
7.43 1.00 Bolon 53+000
7.03 1.00 Bolon 53+000
4.85 1.00 Bolon 53+000
8.23 1.00 Bolon 53+000
6.96 1.00 Bolon 53+000
8.57 1.00 Bolon 53+000
6.02 1.00 Bolon 53+000
6.67 1.00 Bolon 53+000
7.34 1.00 Bolon 53+000
9.11 1.00 Bolon 53+000
7.44 1.00 Bolon 53+000
6.16 1.00 Bolon 53+000
1.04 1.00 Bolon 53+000
7.39 1.00 Bolon 53+000
6.41 1.00 Bolon 53+000
6.82 1.00 Bolon 53+000
7.76 1.00 Bolon 53+000
6.91 1.00 Bolon 53+000
8.65 1.00 Bolon 53+000
6.96 1.00 Bolon 53+000
9.38 1.00 Bolon 53+000
8.87 1.00 Bolon 53+000
5.17 1.00 Bolon 53+000
6.61 1.00 Bolon 53+000
5.86 1.00 Bolon 53+000
6.21 1.00 Bolon 53+000
7.93 1.00 Bolon 53+000
5.75 1.00 Bolon 53+000
5.99 1.00 Bolon 53+000
3.71 1.00 Bolon 53+000
5.99 1.00 Bolon 53+000
7.11 1.00 Bolon 53+000
6.53 1.00 Bolon 53+000
5.42 1.00 Bolon 53+000
5.61 1.00 Bolon 53+000
5.83 1.00 Bolon 53+000
6.67 1.00 Bolon 53+000
4.84 1.00 Bolon 53+000
6.81 1.00 Bolon 53+000
7.21 1.00 Bolon 53+000
7.52 1.00 Bolon 53+000
7.23 1.00 Bolon 53+000
6.82 1.00 Bolon 53+000
6.76 1.00 Bolon 53+000
6.60 1.00 Bolon 53+000
8.09 1.00 Bolon 53+000
6.86 1.00 Bolon 53+000
6.71 1.00 Bolon 53+000
4.78 1.00 Bolon 53+000
5.19 1.00 Bolon 53+000
5.56 1.00 Bolon 53+000
6.85 1.00 Bolon 53+000
6.45 1.00 Bolon 53+000
7.47 1.00 Bolon 53+000
8.62 1.00 Bolon 53+000
7.47 1.00 Bolon 53+000
5.27 1.00 Bolon 53+000
7.23 1.00 Bolon 53+000
5.53 1.00 Bolon 53+000
4.79 1.00 Bolon 53+000
6.78 1.00 Bolon 53+000
6.64 1.00 Bolon 53+000
6.45 1.00 Bolon 53+000
8.19 1.00 Bolon 53+000
5.36 1.00 Bolon 53+000
6.93 1.00 Bolon 53+000
6.02 1.00 Bolon 53+000
6.68 1.00 Bolon 53+000
8.04 1.00 Bolon 53+000
7.96 1.00 Bolon 53+000
6.33 1.00 Bolon 53+000
4.99 1.00 Bolon 53+000
10.44 1.00 Bolon 53+000
5.63 1.00 Bolon 53+000
5.95 1.00 Bolon 53+000
4.93 1.00 Bolon 53+000
7.27 1.00 Bolon 53+000
5.93 1.00 Bolon 53+000
7.67 1.00 Bolon 52+070
5.18 1.00 Bolon 52+070
7.87 1.00 Bolon 52+300
6.36 1.00 Bolon 52+300
8.27 1.00 Bolon 52+300
6.14 1.00 Bolon 52+300
7.20 1.00 Bolon 52+300
7.67 1.00 Bolon 52+300
5.62 1.00 Bolon 52+300
8.60 1.00 Bolon 52+300
6.73 1.00 Bolon 52+300
7.54 1.00 Bolon 52+300
6.63 1.00 Bolon 52+300
7.48 1.00 Bolon 52+300
7.60 1.00 Bolon 52+300
5.99 1.00 Bolon 52+300
6.97 1.00 Bolon 52+300
6.12 1.00 Bolon 52+300
7.09 1.00 Bolon 52+300
7.65 1.00 Bolon 52+300
6.58 1.00 Bolon 52+300
6.69 1.00 bolon 52+300
7.12 1.00 bolon 52+300
8.84 1.00 bolon 52+300
8.55 1.00 bolon 52+300
7.54 1.00 bolon 52+300
7.73 1.00 bolon 52+300
9.02 1.00 bolon 52+300
6.53 1.00 bolon 52+300
7.36 1.00 bolon 52+300
7.42 1.00 bolon 52+300
5.90 1.00 bolon 52+300
7.02 1.00 bolon 53+300
7.49 1.00 bolon 53+300
5.94 1.00 bolon 53+300
8.51 1.00 bolon 53+300
7.39 1.00 bolon 53+300
6.98 1.00 bolon 53+300
7.22 1.00 bolon 53+300
7.97 1.00 bolon 53+300
7.74 1.00 bolon 53+300
7.47 1.00 bolon 53+300
6.21 1.00 bolon 53+300
7.76 1.00 bolon 53+300
6.36 1.00 bolon 53+300
7.98 1.00 Bolon 53+300
6.08 1.00 Bolon 53+300
8.23 1.00 Bolon 53+300
8.54 1.00 Bolon 53+300
5.76 1.00 Bolon 53+300
6.29 1.00 Bolon 53+300
6.18 1.00 Bolon 53+300
7.92 1.00 Bolon 53+300
7.00 1.00 Bolon 53+300
8.60 1.00 Bolon 53+300
8.07 1.00 Bolon 53+300
7.27 1.00 Bolon 53+300
5.18 1.00 Bolon 53+300
7.33 1.00 Bolon 53+300
7.25 1.00 Bolon 53+300
5.02 1.00 Bolon 53+300
8.95 1.00 Bolon 53+300
8.09 1.00 Bolon 53+300
6.83 1.00 Bolon 53+300
6.60 1.00 Bolon 53+300
6.18 1.00 Bolon 53+300
8.95 1.00 Bolon 53+900
8.72 1.00 Bolon 53+900
7.09 1.00 Bolon 53+900
7.93 1.00 Bolon 53+900
7.45 1.00 Bolon 53+900
6.25 1.00 Bolon 53+900
8.03 1.00 Bolon 53+900
7.95 1.00 Bolon 53+900
5.00 1.00 Bolon 53+900
6.42 1.00 Bolon 53+900
7.44 1.00 Bolon 53+900
5.67 1.00 Bolon 53+900
7.28 1.00 Bolon 53+900
4.92 1.00 Bolon 53+900
7.52 1.00 Bolon 53+900
8.26 1.00 Bolon 53+900
5.93 1.00 Bolon 53+900
7.60 1.00 Bolon 53+900
6.85 1.00 Bolon 53+900
8.36 1.00 Bolon 53+900
7.79 1.00 Bolon 53+900
6.53 1.00 Bolon 53+900
8.52 1.00 Bolon 53+900
5.59 1.00 Bolon 53+900
8.67 1.00 Bolon 53+900
7.63 1.00 Bolon 53+900
7.07 1.00 Bolon 53+900
6.16 1.00 Bolon 53+900
6.12 1.00 Bolon 53+900
6.40 1.00 Bolon 53+900
8.24 1.00 Bolon 53+900
7.16 1.00 Bolon 53+900
0.68 1.00 Bolon 53+900
10.30 1.00 Bolon 53+900
7.95 1.00 Bolon 53+900
6.88 1.00 Bolon 53+900
5.55 1.00 Bolon 53+900
7.91 1.00 Bolon 53+900
6.44 1.00 Bolon 53+900
6.15 1.00 Bolon 53+900
8.23 1.00 Bolon 53+900
5.37 1.00 Bolon 53+900
5.25 1.00 Bolon 53+900
7.95 1.00 Bolon 53+900
5.66 1.00 Bolon 53+300
6.19 1.00 Bolon 53+300
7.42 1.00 Bolon 53+300
7.68 1.00 Bolon 53+300
7.39 1.00 Bolon 53+300
6.85 1.00 Bolon 52+400
4.99 1.00 Bolon 52+400
4.83 1.00 Bolon 52+400
5.74 1.00 Bolon 52+400
6.14 1.00 Bolon 52+400
7.73 1.00 Bolon 52+400
7.23 1.00 Bolon 52+400
7.20 1.00 Bolon 52+400
6.76 1.00 Bolon 52+400
6.55 1.00 Bolon 52+400
8.14 1.00 Bolon 52+400
5.72 1.00 Bolon 52+400
5.99 1.00 Bolon 53+900
5.64 1.00 Bolon 53+900
6.88 1.00 Bolon 53+900
6.20 1.00 Bolon 53+900
7.21 1.00 Bolon 53+900
7.76 1.00 Bolon 53+900
8.35 1.00 Bolon 53+900
7.67 1.00 Bolon 53+300
5.66 1.00 Bolon 53+300
5.52 1.00 Bolon 53+300
6.60 1.00 Bolon 53+300
7.87 1.00 Bolon 53+300
7.42 1.00 Bolon 52+400
5.77 1.00 Bolon 52+400
6.98 1.00 Bolon 52+400
6.65 1.00 Bolon 52+400
5.45 1.00 Bolon 52+400
6.45 1.00 Bolon 52+400
6.16 1.00 Bolon 52+400
7.56 1.00 Bolon 52+400
4.81 1.00 Bolon 52+400
5.39 1.00 Bolon 52+400
7.60 1.00 Bolon 52+400
7.56 1.00 Bolon 52+400
9.52 1.00 Bolon 52+400
6.69 1.00 Bolon 52+400
6.09 1.00 Bolon 52+400
6.45 1.00 Bolon 52+400
6.02 1.00 Bolon 52+400
6.63 1.00 Bolon 52+400
7.65 1.00 Bolon 52+400
6.23 1.00 Bolon 52+400
7.74 1.00 Bolon 52+400
6.96 1.00 Bolon 52+400
5.12 1.00 Bolon 52+400
4.92 1.00 Bolon 52+400
5.99 1.00 Bolon 52+400
4.71 1.00 Bolon 52+400
6.64 1.00 Bolon 52+400
7.11 1.00 Bolon 52+400
8.94 1.00 Bolon 53+900
7.24 1.00 Bolon 53+900
6.03 1.00 Bolon 53+900
6.90 1.00 Bolon 53+900
7.73 1.00 Bolon 53+900
5.48 1.00 Bolon 53+900
7.72 1.00 Bolon 53+900
7.08 1.00 Bolon 53+900
6.60 1.00 Bolon 53+900
8.25 1.00 Bolon 53+900
5.53 1.00 Bolon 53+900
5.67 1.00 Bolon 53+900
7.32 1.00 Bolon 52+400
5.87 1.00 Bolon 52+400
7.27 1.00 Bolon 52+400
6.83 1.00 Bolon 52+400
6.06 1.00 Bolon 52+400
5.82 1.00 Bolon 52+400
5.65 1.00 Bolon 52+400
8.40 1.00 Bolon 52+400
6.68 1.00 Bolon 52+400
8.31 1.00 Bolon 52+400
8.84 1.00 Bolon 52+400
6.86 1.00 Bolon 52+500
4.53 1.00 Bolon 52+500
8.32 1.00 Bolon 52+500
7.08 1.00 Bolon 52+500
7.71 1.00 Bolon 52+500
7.10 1.00 Bolon 52+500
6.22 1.00 Bolon 52+500
5.49 1.00 Bolon 52+500
5.59 1.00 Bolon 53+900
7.89 1.00 Bolon 53+900
7.61 1.00 Bolon 53+900
7.98 1.00 Bolon 53+900
5.68 1.00 Bolon 53+900
6.17 1.00 Bolon 53+900
8.42 1.00 Bolon 53+900
6.69 1.00 Bolon 53+900
8.00 1.00 Bolon 53+900
7.09 1.00 Bolon 53+900
5.90 1.00 Bolon 53+900
6.39 1.00 Bolon 53+900
6.46 1.00 Bolon 53+900
6.01 1.00 Bolon 53+900
6.75 1.00 Bolon 53+900
8.11 1.00 Bolon 53+900
6.33 1.00 Bolon 53+300
6.01 1.00 Bolon 53+300
6.15 1.00 Bolon 53+300
7.44 1.00 Bolon 53+300
7.96 1.00 Bolon 53+300
6.01 1.00 Bolon 52+400
6.28 1.00 Bolon 52+400
5.83 1.00 Bolon 52+400
6.73 1.00 Bolon 52+400
7.40 1.00 Bolon 52+400
6.68 1.00 Bolon 52+400
5.66 1.00 Bolon 52+400
7.37 1.00 Bolon 52+400
7.14 1.00 Bolon 52+400
6.40 1.00 Bolon 52+400
6.77 1.00 Bolon 52+400
7.18 1.00 Bolon 52+400
7.48 1.00 Bolon 52+400
6.63 1.00 Bolon 52+400
7.17 1.00 Bolon 52+400
6.81 1.00 Bolon 52+400
8.18 1.00 Bolon 52+400
8.46 1.00 Bolon 52+400
1.67 1.00 Bolon 52+400
7.21 1.00 Bolon 52+400
6.82 1.00 Bolon 52+400
6.96 1.00 Bolon 52+400
6.24 1.00 Bolon 52+400
7.06 1.00 Bolon 52+400
7.37 1.00 Bolon 52+400
7.57 1.00 Bolon 52+400
7.57 1.00 Bolon 52+400
6.40 1.00 Bolon 52+400
6.83 1.00 Bolon 53+900
7.44 1.00 Bolon 53+900
8.48 1.00 Bolon 53+900
7.33 1.00 Bolon 53+900
7.63 1.00 Bolon 53+900
7.52 1.00 Bolon 53+900
5.07 1.00 Bolon 53+900
7.15 1.00 Bolon 53+900
7.50 1.00 Bolon 53+900
7.37 1.00 Bolon 53+900
6.45 1.00 Bolon 53+900
8.66 1.00 Bolon 53+900
7.92 1.00 Bolon 52+400
6.77 1.00 Bolon 52+400
6.47 1.00 Bolon 52+400
7.96 1.00 Bolon 52+400
4.83 1.00 Bolon 52+400
6.43 1.00 Bolon 52+400
8.87 1.00 Bolon 52+400
4.73 1.00 Bolon 52+400
6.64 1.00 Bolon 52+400
7.13 1.00 Bolon 52+400
5.41 1.00 Bolon 52+400
6.99 1.00 Bolon 52+500
5.31 1.00 Bolon 52+500
5.31 1.00 Bolon 52+500
6.13 1.00 Bolon 52+500
7.11 1.00 Bolon 52+500
7.17 1.00 Bolon 52+500
8.01 1.00 Bolon 52+500
8.44 1.00 Bolon 52+500
6.79 1.00 Bolon 53+900
7.23 1.00 Bolon 53+900
6.37 1.00 Bolon 53+900
0.71 1.00 Bolon 53+900
8.06 1.00 Bolon 53+900
6.17 1.00 Bolon 53+900
6.73 1.00 Bolon 53+900
8.49 1.00 Bolon 53+900
6.15 1.00 Bolon 53+900
6.09 1.00 Bolon 53+900
7.32 1.00 Bolon 53+900
5.43 1.00 Bolon 53+900
7.67 1.00 Bolon 53+900
7.67 1.00 Bolon 53+900
7.58 1.00 Bolon 53+900
8.44 1.00 Bolon 53+900
9.45 1.00 Bolon 53+900
8.49 1.00 Bolon 53+900
6.19 1.00 Bolon 53+900
6.00 1.00 Bolon 53+900
6.07 1.00 Bolon 53+900
6.11 1.00 Bolon 53+900
6.81 1.00 Bolon 53+900
7.33 1.00 Bolon 53+900
9.02 1.00 Bolon 53+900
7.95 1.00 Bolon 53+900
5.83 1.00 Bolon 53+900
6.09 1.00 Bolon 53+900
6.87 1.00 Bolon 53+900
7.50 1.00 Bolon 53+900
7.81 1.00 Bolon 53+900
7.71 1.00 Bolon 53+300
7.04 1.00 Bolon 53+300
6.39 1.00 Bolon 53+300
5.73 1.00 Bolon 53+300
6.25 1.00 Bolon 53+300
5.60 1.00 Bolon 52+400
7.52 1.00 Bolon 52+400
7.56 1.00 Bolon 52+400
5.31 1.00 Bolon 52+400
8.57 1.00 Bolon 52+400
6.53 1.00 Bolon 52+400
9.12 1.00 Bolon 52+400
6.92 1.00 Bolon 52+400
6.41 1.00 Bolon 52+400
8.16 1.00 Bolon 52+400
8.55 1.00 Bolon 52+400
7.99 1.00 Bolon 52+400
7.93 1.00 Bolon 52+400
6.14 1.00 Bolon 52+400
7.54 1.00 Bolon 52+400
6.88 1.00 Bolon 52+400
6.31 1.00 Bolon 52+400
4.76 1.00 Bolon 52+400
4.98 1.00 Bolon 52+400
4.05 1.00 Bolon 52+400
8.71 1.00 Bolon 52+400
8.74 1.00 Bolon 52+400
7.87 1.00 Bolon 52+400
7.04 1.00 Bolon 52+400
7.24 1.00 Bolon 52+400
7.00 1.00 Bolon 52+400
7.91 1.00 Bolon 52+400
7.71 1.00 Bolon 52+400
7.64 1.00 Bolon 53+900
5.86 1.00 Bolon 53+900
5.33 1.00 Bolon 53+900
7.12 1.00 Bolon 53+900
6.33 1.00 Bolon 53+900
4.15 1.00 Bolon 53+900
6.71 1.00 Bolon 53+900
8.80 1.00 Bolon 53+900
8.17 1.00 Bolon 53+900
7.52 1.00 Bolon 53+900
6.48 1.00 Bolon 53+900
6.92 1.00 Bolon 53+900
5.71 1.00 Bolon 52+400
7.71 1.00 Bolon 52+400
7.15 1.00 Bolon 52+400
6.48 1.00 Bolon 52+400
7.20 1.00 Bolon 52+400
4.10 1.00 Bolon 52+400
5.87 1.00 Bolon 52+400
5.88 1.00 Bolon 52+400
4.76 1.00 Bolon 52+400
5.62 1.00 Bolon 52+400
6.88 1.00 Bolon 52+400
7.90 1.00 Bolon 52+500
6.14 1.00 Bolon 52+500
6.56 1.00 Bolon 52+500
5.26 1.00 Bolon 52+500
4.77 1.00 Bolon 52+500
7.24 1.00 Bolon 52+500
6.43 1.00 Bolon 52+500
6.69 1.00 Bolon 52+500
6.14 1.00 Bolon 53+900
7.33 1.00 Bolon 53+900
8.03 1.00 Bolon 53+900
8.13 1.00 Bolon 53+900
6.12 1.00 Bolon 53+900
5.17 1.00 Bolon 53+900
4.20 1.00 Bolon 53+900
7.98 1.00 Bolon 53+900
6.99 1.00 Bolon 53+900
6.56 1.00 Bolon 53+900
6.83 1.00 Bolon 53+900
7.50 1.00 Bolon 53+900
5.54 1.00 Bolon 53+900
6.55 1.00 Bolon 53+900
6.67 1.00 Bolon 53+900
6.11 1.00 Bolon 53+900
6.04 1.00 Bolon 53+900
4.71 1.00 Bolon 53+900
6.94 1.00 Bolon 53+900
7.72 1.00 Bolon 53+900
7.19 1.00 Bolon 53+900
6.46 1.00 Bolon 53+900
4.91 1.00 Bolon 53+900
6.95 1.00 Bolon 53+900
6.07 1.00 Bolon 53+900
7.37 1.00 Bolon 53+900
7.79 1.00 Bolon 53+900
6.87 1.00 Bolon 53+900
11.24 1.00 Bolon 53+900
5.78 1.00 Bolon 53+900
5.88 1.00 Bolon 53+900
6.06 1.00 Bolon 53+900
6.43 1.00 Bolon 53+900
6.64 1.00 Bolon 53+900
4.49 1.00 Bolon 53+900
5.32 1.00 Bolon 53+900
3.91 1.00 Bolon 53+900
5.39 1.00 Bolon 53+900
7.28 1.00 Bolon 53+900
1.88 1.00 Bolon 53+900
6.64 1.00 Bolon 53+900
5.81 1.00 Bolon 53+900
5.47 1.00 Bolon 53+900
5.74 1.00 Bolon 53+900
6.36 1.00 Bolon 53+900
5.69 1.00 Bolon 53+900
4.99 1.00 Bolon 53+900
6.06 1.00 Bolon 53+900
4.98 1.00 Bolon 53+900
5.68 1.00 Bolon 53+900
6.15 1.00 Bolon 53+900
5.16 1.00 Bolon 53+900
5.22 1.00 Bolon 53+900
4.28 1.00 Bolon 53+900
6.31 1.00 Bolon 53+900
6.71 1.00 Bolon 53+900
7.81 1.00 Bolon 53+900
6.44 1.00 Bolon 53+900
5.22 1.00 Bolon 53+900
6.26 1.00 Bolon 53+900
7.68 1.00 Bolon 53+900
4.56 1.00 Bolon 53+900
6.22 1.00 Bolon 53+900
6.31 1.00 Bolon 53+300
6.93 1.00 Bolon 53+300
4.80 1.00 Bolon 53+300
6.39 1.00 Bolon 53+300
8.60 1.00 Bolon 53+300
8.00 1.00 Bolon 52+400
5.95 1.00 Bolon 52+400
7.85 1.00 Bolon 52+400
6.48 1.00 Bolon 52+400
7.38 1.00 Bolon 52+400
7.63 1.00 Bolon 52+400
6.57 1.00 Bolon 52+400
8.48 1.00 Bolon 52+400
8.59 1.00 Bolon 52+400
6.76 1.00 Bolon 52+400
7.22 1.00 Bolon 52+400
7.72 1.00 Bolon 52+400
8.28 1.00 Bolon 52+400
4.49 1.00 Bolon 52+400
6.27 1.00 Bolon 52+400
5.98 1.00 Bolon 52+400
7.73 1.00 Bolon 52+400
7.75 1.00 Bolon 52+400
6.44 1.00 Bolon 52+400
6.67 1.00 Bolon 52+400
8.69 1.00 Bolon 52+400
7.99 1.00 Bolon 52+400
3.84 1.00 Bolon 52+400
7.77 1.00 Bolon 52+400
6.55 1.00 Bolon 52+400
8.48 1.00 Bolon 52+400
6.44 1.00 Bolon 52+400
8.78 1.00 Bolon 52+400
7.61 1.00 Bolon 53+900
8.23 1.00 Bolon 53+900
5.78 1.00 Bolon 53+900
7.09 1.00 Bolon 53+900
5.82 1.00 Bolon 53+900
5.71 1.00 Bolon 53+900
8.25 1.00 Bolon 53+900
6.75 1.00 Bolon 53+900
6.84 1.00 Bolon 53+900
5.22 1.00 Bolon 53+900
6.98 1.00 Bolon 53+900
6.37 1.00 Bolon 53+900
6.17 1.00 Bolon 52+400
6.40 1.00 Bolon 52+400
7.40 1.00 Bolon 52+400
6.54 1.00 Bolon 52+400
1.36 1.00 Bolon 52+400
5.75 1.00 Bolon 52+400
6.77 1.00 Bolon 52+400
6.47 1.00 Bolon 52+400
7.53 1.00 Bolon 52+400
7.52 1.00 Bolon 52+400
5.33 1.00 Bolon 52+400
9.03 1.00 Bolon 52+500
6.45 1.00 Bolon 52+500
7.50 1.00 Bolon 52+500
7.38 1.00 Bolon 52+500
7.24 1.00 Bolon 52+500
7.27 1.00 Bolon 52+500
5.89 1.00 Bolon 52+500
0.45 1.00 Bolon 52+500
5.92 1.00 Bolon 53+900
7.34 1.00 Bolon 53+900
5.92 1.00 Bolon 53+900
5.46 1.00 Bolon 53+900
8.31 1.00 Bolon 53+900
7.07 1.00 Bolon 53+900
7.62 1.00 Bolon 53+900
6.16 1.00 Bolon 53+900
6.57 1.00 Bolon 53+900
4.87 1.00 Bolon 53+900
8.03 1.00 Bolon 53+900
8.14 1.00 Bolon 53+900
7.49 1.00 Bolon 53+900
5.07 1.00 Bolon 53+900
8.29 1.00 Bolon 53+900
11.96 1.00 Bolon 53+900
6.22 1.00 Bolon 53+900
10.51 1.00 Bolon 53+900
9.17 1.00 Bolon 53+900
7.14 1.00 Bolon 53+900
8.51 1.00 Bolon 53+900
7.94 1.00 Bolon 53+900
4.50 1.00 Bolon 53+900
6.57 1.00 Bolon 53+900
6.26 1.00 Bolon 53+900
5.47 1.00 Bolon 53+900
5.22 1.00 Bolon 53+900
7.76 1.00 Bolon 53+900
4.39 1.00 Bolon 53+900
7.19 1.00 Bolon 53+900
6.79 1.00 Bolon 53+900
6.43 1.00 Bolon 53+900
7.90 1.00 Bolon 53+900
4.68 1.00 Bolon 53+900
4.88 1.00 Bolon 53+900
6.99 1.00 Bolon 53+900
7.44 1.00 Bolon 53+900
6.50 1.00 Bolon 53+900
6.66 1.00 Bolon 53+900
7.22 1.00 Bolon 53+900
6.69 1.00 Bolon 53+900
4.04 1.00 Bolon 53+900
4.73 1.00 Bolon 53+900
5.53 1.00 Bolon 53+900
4.91 1.00 Bolon 53+900
4.11 1.00 Bolon 53+900
7.76 1.00 Bolon 53+900
6.04 1.00 Bolon 53+900
6.17 1.00 Bolon 53+900
4.87 1.00 Bolon 53+900
4.79 1.00 Bolon 53+900
6.84 1.00 Bolon 53+900
7.02 1.00 Bolon 53+900
2.79 1.00 Bolon 53+900
7.57 1.00 Bolon 53+900
6.72 1.00 Bolon 53+900
7.37 1.00 Bolon 53+900
6.29 1.00 Bolon 53+900
4.92 1.00 Bolon 53+900
6.71 1.00 Bolon 53+900
7.44 1.00 Bolon 53+900
7.93 1.00 Bolon 53+900
7.33 1.00 Bolon 53+900
5.58 1.00 Bolon 53+900
7.07 1.00 Bolon 53+900
4.33 1.00 Bolon 53+900
4.85 1.00 Bolon 53+900
5.50 1.00 Bolon 53+900
6.35 1.00 Bolon 53+900
8.45 1.00 Bolon 53+900
5.83 1.00 Bolon 53+900
6.84 1.00 Bolon 53+900
7.95 1.00 Bolon 53+900
8.32 1.00 Bolon 53+900
6.82 1.00 Bolon 53+900
7.65 1.00 Bolon 53+900
5.39 1.00 Bolon 53+300
7.06 1.00 Bolon 53+300
5.76 1.00 Bolon 53+300
8.48 1.00 Bolon 53+300
8.20 1.00 Bolon 53+300
7.30 1.00 Bolon 52+400
7.29 1.00 Bolon 52+400
7.27 1.00 Bolon 52+400
6.34 1.00 Bolon 52+400
8.79 1.00 Bolon 52+400
6.92 1.00 Bolon 52+400
8.01 1.00 Bolon 52+400
8.90 1.00 Bolon 52+400
4.92 1.00 Bolon 52+400
7.67 1.00 Bolon 52+400
9.09 1.00 Bolon 52+400
8.00 1.00 Bolon 52+400
5.20 1.00 Bolon 52+400
7.13 1.00 Bolon 52+400
7.60 1.00 Bolon 52+400
7.99 1.00 Bolon 52+400
8.08 1.00 Bolon 52+400
7.89 1.00 Bolon 52+400
3.93 1.00 Bolon 52+400
7.68 1.00 Bolon 52+400
6.06 1.00 Bolon 52+400
8.05 1.00 Bolon 52+400
8.96 1.00 Bolon 52+400
7.06 1.00 Bolon 52+400
9.05 1.00 Bolon 52+400
5.32 1.00 Bolon 52+400
6.02 1.00 Bolon 52+400
7.48 1.00 Bolon 52+400
5.91 1.00 Bolon 53+900
8.87 1.00 Bolon 53+900
9.20 1.00 Bolon 53+900
7.77 1.00 Bolon 53+900
7.59 1.00 Bolon 53+900
6.13 1.00 Bolon 53+900
8.08 1.00 Bolon 53+900
5.26 1.00 Bolon 53+900
5.24 1.00 Bolon 53+900
5.54 1.00 Bolon 53+900
7.76 1.00 Bolon 53+900
6.13 1.00 Bolon 53+900
6.61 1.00 Bolon 52+400
8.32 1.00 Bolon 52+400
6.44 1.00 Bolon 52+400
7.52 1.00 Bolon 52+400
7.98 1.00 Bolon 52+400
4.43 1.00 Bolon 52+400
6.33 1.00 Bolon 52+400
7.11 1.00 Bolon 52+400
7.46 1.00 Bolon 52+400
6.51 1.00 Bolon 52+400
5.41 1.00 Bolon 52+400
4.09 1.00 Bolon 52+500
7.70 1.00 Bolon 52+500
6.19 1.00 Bolon 52+500
7.00 1.00 Bolon 52+500
6.05 1.00 Bolon 52+500
7.42 1.00 Bolon 52+500
6.53 1.00 Bolon 52+500
5.27 1.00 Bolon 52+500
6.83 1.00 Bolon 53+900
7.17 1.00 Bolon 53+900
7.15 1.00 Bolon 53+900
5.48 1.00 Bolon 53+900
7.43 1.00 Bolon 53+900
7.06 1.00 Bolon 53+900
6.00 1.00 Bolon 53+900
7.74 1.00 Bolon 53+900
3.99 1.00 Bolon 53+900
5.64 1.00 Bolon 53+900
6.48 1.00 Bolon 53+900
5.06 1.00 Bolon 53+900
9.09 1.00 Bolon 53+900
6.99 1.00 Bolon 53+900
7.87 1.00 Bolon 53+900
5.64 1.00 Bolon 53+900
6.21 1.00 Bolon 53+900
5.09 1.00 Bolon 53+900
6.24 1.00 Bolon 53+900
7.60 1.00 Bolon 53+900
6.55 1.00 Bolon 53+900
5.69 1.00 Bolon 53+900
6.24 1.00 Bolon 53+900
6.99 1.00 Bolon 53+900
5.95 1.00 Bolon 53+900
7.30 1.00 Bolon 53+900
8.23 1.00 Bolon 53+900
7.17 1.00 Bolon 53+900
6.57 1.00 Bolon 53+900
7.19 1.00 Bolon 53+900
6.03 1.00 Bolon 53+900
5.14 1.00 Bolon 53+900
8.09 1.00 Bolon 53+900
4.90 1.00 Bolon 53+900
5.41 1.00 Bolon 53+900
8.74 1.00 Bolon 53+900
6.88 1.00 Bolon 53+900
7.39 1.00 Bolon 53+900
3.99 1.00 Bolon 53+900
7.01 1.00 Bolon 53+900
8.53 1.00 Bolon 53+900
5.91 1.00 Bolon 53+900
7.48 1.00 Bolon 53+900
7.21 1.00 Bolon 53+900
7.21 1.00 Bolon 53+900
6.93 1.00 Bolon 53+900
8.33 1.00 Bolon 53+900
7.20 1.00 Bolon 53+900
6.03 1.00 Bolon 53+900
6.63 1.00 Bolon 53+900
4.68 1.00 Bolon 53+900
7.65 1.00 Bolon 53+900
6.50 1.00 Bolon 53+900
0.91 1.00 Bolon 53+900
6.48 1.00 Bolon 53+900
5.63 1.00 Bolon 53+900
5.49 1.00 Bolon 53+900
7.19 1.00 Bolon 53+900
6.93 1.00 Bolon 53+900
5.80 1.00 Bolon 53+900
4.27 1.00 Bolon 53+900
6.87 1.00 Bolon 53+900
6.27 1.00 Bolon 53+900
6.03 1.00 Bolon 53+900
6.20 1.00 Bolon 53+900
5.84 1.00 Bolon 53+900
5.31 1.00 Bolon 53+900
5.75 1.00 Bolon 53+900
6.33 1.00 Bolon 53+900
3.95 1.00 Bolon 53+900
4.04 1.00 Bolon 53+900
4.70 1.00 Bolon 53+900
5.92 1.00 Bolon 53+900
7.20 1.00 Bolon 53+900
6.38 1.00 Bolon 53+900
4.25 1.00 Bolon 53+900
7.30 1.00 Bolon 53+900
5.46 1.00 Bolon 53+900
5.17 1.00 Bolon 53+900
5.54 1.00 Bolon 53+900
5.65 1.00 Bolon 53+900
6.66 1.00 Bolon 53+900
5.01 1.00 Bolon 53+900
4.72 1.00 Bolon 53+900
4.04 1.00 Bolon 53+900
6.73 1.00 Bolon 53+300
5.24 1.00 Bolon 53+300
4.41 1.00 Bolon 53+300
5.84 1.00 Bolon 53+300
5.75 1.00 Bolon 53+300
6.82 1.00 Bolon 52+400
6.41 1.00 Bolon 52+400
6.62 1.00 Bolon 52+400
5.85 1.00 Bolon 52+400
3.96 1.00 Bolon 52+400
4.80 1.00 Bolon 52+400
4.58 1.00 Bolon 52+400
4.20 1.00 Bolon 52+400
6.45 1.00 Bolon 52+400
5.48 1.00 Bolon 52+400
5.47 1.00 Bolon 52+400
6.15 1.00 Bolon 52+400
5.64 1.00 Bolon 52+400
6.99 1.00 Bolon 52+400
7.02 1.00 Bolon 52+400
4.59 1.00 Bolon 52+400
4.83 1.00 Bolon 52+400
5.29 1.00 Bolon 52+400
4.29 1.00 Bolon 52+400
7.73 1.00 Bolon 52+400
7.73 1.00 Bolon 52+400
8.02 1.00 Bolon 52+400
3.91 1.00 Bolon 52+400
3.85 1.00 Bolon 52+400
3.48 1.00 Bolon 52+400
4.91 1.00 Bolon 52+400
8.38 1.00 Bolon 52+400
5.11 1.00 Bolon 52+400
6.08 1.00 Bolon 53+900
7.41 1.00 Bolon 53+900
3.24 1.00 Bolon 53+900
4.32 1.00 Bolon 53+900
7.57 1.00 Bolon 53+900
6.04 1.00 Bolon 53+900
7.65 1.00 Bolon 53+900
4.50 1.00 Bolon 53+900
4.86 1.00 Bolon 53+900
5.03 1.00 Bolon 53+900
6.04 1.00 Bolon 53+900
6.12 1.00 Bolon 53+900
8.82 1.00 Bolon 52+400
5.99 1.00 Bolon 53+900
5.82 1.00 Bolon 53+900
7.07 1.00 Bolon 53+900
6.78 1.00 Bolon 53+900
6.65 1.00 Bolon 53+900
7.22 1.00 Bolon 53+900
5.98 1.00 Bolon 53+900
6.41 1.00 Bolon 53+300
5.16 1.00 Bolon 53+300
6.40 1.00 Bolon 53+300
4.59 1.00 Bolon 53+300
7.29 1.00 Bolon 53+300
5.41 1.00 Bolon 52+400
5.79 1.00 Bolon 52+400
5.00 1.00 Bolon 52+400
5.12 1.00 Bolon 52+400
7.24 1.00 Bolon 52+400
7.24 1.00 Bolon 52+400
5.99 1.00 Bolon 52+400
7.27 1.00 Bolon 52+400
5.79 1.00 Bolon 52+400
6.74 1.00 Bolon 52+400
6.54 1.00 Bolon 52+400
7.23 1.00 Bolon 52+400
4.84 1.00 Bolon 52+400
6.57 1.00 Bolon 52+400
6.52 1.00 Bolon 52+400
6.97 1.00 Bolon 52+400
5.74 1.00 Bolon 52+400
4.88 1.00 Bolon 52+400
6.42 1.00 Bolon 52+400
6.88 1.00 Bolon 52+400
5.79 1.00 Bolon 52+400
7.10 1.00 Bolon 52+400
6.78 1.00 Bolon 52+400
6.28 1.00 Bolon 52+400
5.59 1.00 Bolon 52+400
5.53 1.00 Bolon 52+400
7.59 1.00 Bolon 52+400
6.17 1.00 Bolon 53+900
6.41 1.00 Bolon 53+900
4.34 1.00 Bolon 53+900
6.41 1.00 Bolon 53+900
5.67 1.00 Bolon 53+900
6.71 1.00 Bolon 53+900
5.63 1.00 Bolon 53+900
5.88 1.00 Bolon 53+900
5.29 1.00 Bolon 53+900
5.61 1.00 Bolon 53+900
6.36 1.00 Bolon 53+900
6.32 1.00 Bolon 53+900
7.09 1.00 Bolon 52+400
6.55 1.00 Bolon 52+400
5.01 1.00 Bolon 52+400
5.55 1.00 Bolon 52+400
4.88 1.00 Bolon 52+400
6.33 1.00 Bolon 52+400
5.80 1.00 Bolon 52+400
6.35 1.00 Bolon 52+400
4.73 1.00 Bolon 52+400
6.76 1.00 Bolon 52+400
7.39 1.00 Bolon 52+400
6.75 1.00 Bolon 52+500
6.49 1.00 Bolon 52+500
5.58 1.00 Bolon 52+500
6.96 1.00 Bolon 52+500
7.11 1.00 Bolon 52+500
6.53 1.00 Bolon 52+500
5.25 1.00 Bolon 52+500
6.03 1.00 Bolon 52+500
5.34 1.00 Bolon 53+900
5.83 1.00 Bolon 53+900
6.13 1.00 Bolon 53+900
5.83 1.00 Bolon 53+900
5.67 1.00 Bolon 53+900
5.57 1.00 Bolon 53+900
6.25 1.00 Bolon 53+900
6.44 1.00 Bolon 53+900
5.82 1.00 Bolon 53+900
6.51 1.00 Bolon 53+900
6.16 1.00 Bolon 53+900
5.64 1.00 Bolon 53+300
6.12 1.00 Bolon 53+300
6.46 1.00 Bolon 53+300
5.99 1.00 Bolon 53+300
6.35 1.00 Bolon 53+300
4.64 1.00 Bolon 52+400
5.14 1.00 Bolon 52+400
4.79 1.00 Bolon 52+400
6.27 1.00 Bolon 52+400
7.27 1.00 Bolon 52+400
5.75 1.00 Bolon 52+400
5.68 1.00 Bolon 52+400
6.15 1.00 Bolon 52+400
5.61 1.00 Bolon 52+400
7.29 1.00 Bolon 52+400
4.63 1.00 Bolon 52+400
7.09 1.00 Bolon 52+400
2.42 1.00 Bolon 52+400
6.28 1.00 Bolon 52+400
5.08 1.00 Bolon 52+400
4.86 1.00 Bolon 52+400
6.42 1.00 Bolon 52+400
4.96 1.00 Bolon 52+400
6.03 1.00 Bolon 52+400
6.34 1.00 Bolon 52+400
5.99 1.00 Bolon 52+400
5.58 1.00 Bolon 52+400
5.81 1.00 Bolon 52+400
5.53 1.00 Bolon 52+400
5.87 1.00 Bolon 52+400
6.16 1.00 Bolon 53+900
5.16 1.00 Bolon 53+900
6.19 1.00 Bolon 53+900
5.57 1.00 Bolon 53+900
5.91 1.00 Bolon 53+900
6.10 1.00 Bolon 53+900
4.40 1.00 Bolon 53+900
6.80 1.00 Bolon 53+900
6.52 1.00 Bolon 53+900
5.42 1.00 Bolon 53+900
4.46 1.00 Bolon 53+900
4.04 1.00 Bolon 53+900
5.56 1.00 Bolon 52+400
7.77 1.00 Bolon 52+400
6.16 1.00 Bolon 52+400
5.99 1.00 Bolon 52+400
6.72 1.00 Bolon 52+400
5.63 1.00 Bolon 52+400
5.17 1.00 Bolon 52+400
6.18 1.00 Bolon 52+400
6.44 1.00 Bolon 52+400
4.57 1.00 Bolon 52+400
3.84 1.00 Bolon 52+400
7.77 1.00 Bolon 52+500
6.84 1.00 Bolon 52+500
5.09 1.00 Bolon 52+500
4.76 1.00 Bolon 52+500
7.11 1.00 Bolon 52+500
4.64 1.00 Bolon 52+500
5.25 1.00 Bolon 52+500
5.50 1.00 Bolon 52+500
5.93 1.00 Bolon 53+900
4.95 1.00 Bolon 53+900
5.88 1.00 Bolon 53+900
5.85 1.00 Bolon 53+900
4.81 1.00 Bolon 53+900
4.98 1.00 Bolon 53+900
3.92 1.00 Bolon 53+900
5.55 1.00 Bolon 53+900
5.51 1.00 Bolon 53+900
4.55 1.00 Bolon 53+900
7.32 1.00 Bolon 53+900
2.81 1.00 Bolon 53+900
4.15 1.00 Bolon 53+900
3.20 1.00 Bolon 53+900
6.63 1.00 Bolon 53+900
6.14 1.00 Bolon 53+900
6.03 1.00 Bolon 53+900
6.68 1.00 Bolon 53+900
5.34 1.00 Bolon 53+900
4.81 1.00 Bolon 53+900
6.11 1.00 Bolon 53+300
7.47 1.00 Bolon 53+300
5.57 1.00 Bolon 53+300
5.75 1.00 Bolon 53+300
6.36 1.00 Bolon 53+300
5.27 1.00 Bolon 52+400
6.83 1.00 Bolon 52+400
4.81 1.00 Bolon 52+400
5.61 1.00 Bolon 52+400
6.05 1.00 Bolon 52+400
4.21 1.00 Bolon 52+400
2.66 1.00 Bolon 52+400
4.78 1.00 Bolon 52+400
6.34 1.00 Bolon 52+400
6.44 1.00 Bolon 52+400
6.19 1.00 Bolon 52+400
6.34 1.00 Bolon 52+400
5.44 1.00 Bolon 52+400
5.07 1.00 Bolon 52+400
5.27 1.00 Bolon 52+400
4.86 1.00 Bolon 52+400
5.77 1.00 Bolon 52+400
4.96 1.00 Bolon 52+400
6.73 1.00 Bolon 52+400
4.61 1.00 Bolon 52+400
5.04 1.00 Bolon 52+400
5.04 1.00 Bolon 52+400
6.08 1.00 Bolon 52+400
6.13 1.00 Bolon 52+400
3.30 1.00 Bolon 52+400
1.65 1.00 Bolon 53+900
5.08 1.00 Bolon 53+900
6.35 1.00 Bolon 53+900
6.20 1.00 Bolon 53+900
6.28 1.00 Bolon 53+900
5.85 1.00 Bolon 53+900
5.32 1.00 Bolon 53+900
5.20 1.00 Bolon 53+900
4.28 1.00 Bolon 53+900
5.67 1.00 Bolon 53+900
4.39 1.00 Bolon 53+900
4.71 1.00 Bolon 53+900
6.21 1.00 Bolon 52+400
5.39 1.00 Bolon 52+400
4.35 1.00 Bolon 52+400
4.79 1.00 Bolon 52+400
4.27 1.00 Bolon 52+400
4.95 1.00 Bolon 52+400
4.20 1.00 Bolon 52+400
5.18 1.00 Bolon 52+400
6.15 1.00 Bolon 52+400
3.89 1.00 Bolon 52+400
7.02 1.00 Bolon 52+400
5.09 1.00 Bolon 52+500
6.32 1.00 Bolon 52+500
4.85 1.00 Bolon 52+500
6.40 1.00 Bolon 52+500
4.42 1.00 Bolon 52+500
1.98 1.00 Bolon 52+500
5.36 1.00 Bolon 52+500
6.07 1.00 Bolon 52+500
4.28 1.00 Bolon 53+900
4.34 1.00 Bolon 53+900
5.62 1.00 Bolon 53+900
5.33 1.00 Bolon 53+900
5.02 1.00 Bolon 53+900
5.89 1.00 Bolon 53+900
4.07 1.00 Bolon 53+900
4.49 1.00 Bolon 53+900
4.88 1.00 Bolon 53+900
5.15 1.00 Bolon 53+900
4.44 1.00 Bolon 53+900
3.84 1.00 Bolon 53+300
3.90 1.00 Bolon 53+300
5.48 1.00 Bolon 53+300
5.17 1.00 Bolon 53+300
4.48 1.00 Bolon 53+300
6.00 1.00 Bolon 52+400
4.29 1.00 Bolon 52+400
6.06 1.00 Bolon 52+400
11.96 1.00 Bolon 52+400
3.40 1.00 Bolon 52+400
5.47 1.00 Bolon 52+400
4.52 1.00 Bolon 52+400
5.25 1.00 Bolon 52+400
5.76 1.00 Bolon 52+400
4.37 1.00 Bolon 52+400
0.00 1.00 Bolon 52+400
4.73 1.00 Bolon 52+400
4.80 1.00 Bolon 52+400
5.29 1.00 Bolon 52+400
3.80 1.00 Bolon 52+400
7.87 1.00 Bolon 52+400
4.98 1.00 Bolon 52+400
4.31 1.00 Bolon 52+400
4.89 1.00 Bolon 52+400
4.03 1.00 Bolon 52+400
4.45 1.00 Bolon 52+400
6.25 1.00 Bolon 52+400
5.33 1.00 Bolon 52+400
5.16 1.00 Bolon 52+400
5.48 1.00 Bolon 52+400
5.19 1.00 Bolon 53+900
4.93 1.00 Bolon 53+900
4.78 1.00 Bolon 53+900
4.99 1.00 Bolon 53+900
4.13 1.00 Bolon 53+900
1.93 1.00 Bolon 53+900
3.83 1.00 Bolon 53+900
6.76 1.00 Bolon 53+900
5.74 1.00 Bolon 53+900
4.65 1.00 Bolon 53+900
4.38 1.00 Bolon 53+900
3.66 1.00 Bolon 53+900
5.13 1.00 Bolon 52+400
5.97 1.00 Bolon 52+400
5.00 1.00 Bolon 52+400
6.35 1.00 Bolon 52+400
4.63 1.00 Bolon 52+400
4.49 1.00 Bolon 52+400
5.03 1.00 Bolon 52+400
4.93 1.00 Bolon 52+400
3.40 1.00 Bolon 52+400
0.00 1.00 Bolon 52+400
0.00 1.00 Bolon 52+400
4.13 1.00 Bolon 52+500
4.84 1.00 Bolon 52+500
5.11 1.00 Bolon 52+500
3.41 1.00 Bolon 52+500
5.38 1.00 Bolon 52+500
3.79 1.00 Bolon 52+500
3.96 1.00 Bolon 52+500
4.27 1.00 Bolon 52+500
0.00 1.00 Bolon 53+900
6.07 1.00 Bolon 53+900
6.20 1.00 Bolon 53+900
5.03 1.00 Bolon 53+900
5.36 1.00 Bolon 53+900
3.62 1.00 Bolon 53+900
6.99 1.00 Bolon 53+900
6.48 1.00 Bolon 53+900
6.37 1.00 Bolon 53+900
0.00 1.00 Bolon 53+900
6.27 1.00 Bolon 53+900
7.27 1.00 Bolon 53+900
6.37 1.00 Bolon 53+900
6.14 1.00 Bolon 53+900
4.17 1.00 Bolon 53+900
4.69 1.00 Bolon 53+900
5.04 1.00 Bolon 53+900
5.12 1.00 Bolon 53+900
4.36 1.00 Bolon 53+900
4.33 1.00 Bolon 53+900
3.66 1.00 Bolon 53+900
3.28 1.00 Bolon 53+900
6.13 1.00 Bolon 53+900
7.74 1.00 Bolon 53+900
4.92 1.00 Bolon 53+900
5.99 1.00 Bolon 53+901
4.58 1.00 Bolon 53+901
3.95 1.00 Bolon 53+902
6.62 1.00 Bolon 53+902
5.43 1.00 Bolon 53+903
4.55 1.00 Bolon 53+903
5.11 1.00 Bolon 53+904
3.53 1.00 Bolon 53+900
5.35 1.00 Bolon 53+900
3.35 1.00 Bolon 53+900
5.16 1.00 Bolon 53+900
4.69 1.00 Bolon 53+900
4.67 1.00 Bolon 53+900
5.04 1.00 Bolon 53+900
4.40 1.00 Bolon 53+300
5.63 1.00 Bolon 53+300
5.96 1.00 Bolon 53+300
0.00 1.00 Bolon 53+300
4.74 1.00 Bolon 53+300
0.00 1.00 Bolon 52+400
6.31 1.00 Bolon 52+400
3.72 1.00 Bolon 52+400
5.37 1.00 Bolon 52+400
4.17 1.00 Bolon 52+400
5.34 1.00 Bolon 52+400
5.88 1.00 Bolon 52+400
6.69 1.00 Bolon 52+400
5.20 1.00 Bolon 52+400
5.43 1.00 Bolon 52+400
4.65 1.00 Bolon 52+400
5.44 1.00 Bolon 52+400
6.15 1.00 Bolon 52+400
6.26 1.00 Bolon 52+400
6.02 1.00 Bolon 52+400
4.71 1.00 Bolon 52+400
5.23 1.00 Bolon 52+400
5.92 1.00 Bolon 52+400
2.84 1.00 Bolon 52+400
7.35 1.00 Bolon 52+400
5.48 1.00 Bolon 52+400
4.60 1.00 Bolon 52+400
4.54 1.00 Bolon 52+400
7.45 1.00 Bolon 52+400
6.85 1.00 Bolon 52+400
5.35 1.00 Bolon 53+900
6.35 1.00 Bolon 53+900
5.60 1.00 Bolon 53+900
4.59 1.00 Bolon 53+900
5.58 1.00 Bolon 53+900
6.34 1.00 Bolon 53+900
3.37 1.00 Bolon 53+900
5.21 1.00 Bolon 53+900
0.29 1.00 Bolon 53+900
3.92 1.00 Bolon 53+900
0.00 1.00 Bolon 53+900
3.48 1.00 Bolon 53+900
4.87 1.00 Bolon 52+400
5.89 1.00 Bolon 52+400
5.85 1.00 Bolon 52+400
4.68 1.00 Bolon 52+400
4.39 1.00 Bolon 52+400
5.79 1.00 Bolon 52+400
6.56 1.00 Bolon 52+400
6.29 1.00 Bolon 52+400
4.17 1.00 Bolon 52+400
7.36 1.00 Bolon 52+400
3.59 1.00 Bolon 52+400
5.68 1.00 Bolon 52+500
6.18 1.00 Bolon 52+500
6.29 1.00 Bolon 52+500
6.54 1.00 Bolon 52+500
6.06 1.00 Bolon 52+500
5.87 1.00 Bolon 52+500
0.00 1.00 Bolon 52+500
4.57 1.00 Bolon 52+500
6.07 1.00 Bolon 53+900
3.74 1.00 Bolon 53+900
5.52 1.00 Bolon 53+900
3.88 1.00 Bolon 53+900
6.30 1.00 Bolon 53+900
4.64 1.00 Bolon 53+900
4.88 1.00 Bolon 53+900
5.88 1.00 Bolon 53+900
3.17 1.00 Bolon 53+900
6.57 1.00 Bolon 53+900
4.08 1.00 Bolon 53+900
6.37 1.00 Bolon 53+900
5.87 1.00 Bolon 53+900
4.05 1.00 Bolon 53+900
3.96 1.00 Bolon 53+900
7.18 1.00 Bolon 53+900
5.78 1.00 Bolon 53+900
5.27 1.00 Bolon 53+900
6.45 1.00 Bolon 53+900
3.96 1.00 Bolon 53+900
5.97 1.00 Bolon 53+900
5.97 1.00 Bolon 53+900
3.58 1.00 Bolon 53+900
4.55 1.00 Bolon 53+900
4.15 1.00 Bolon 53+900
6.06 1.00 Bolon 53+900
5.62 1.00 Bolon 53+900
4.71 1.00 Bolon 53+900
5.17 1.00 Bolon 53+900
4.14 1.00 Bolon 53+900
4.59 1.00 Bolon 53+900
5.98 1.00 Bolon 53+900
6.18 1.00 Bolon 53+900
6.00 1.00 Bolon 53+900
5.19 1.00 Bolon 53+900
5.57 1.00 Bolon 53+900
5.79 1.00 Bolon 53+900
6.01 1.00 Bolon 53+900
6.08 1.00 Bolon 53+900
5.38 1.00 Bolon 53+900
3.15 1.00 Bolon 53+900
5.56 1.00 Bolon 53+900
4.45 1.00 Bolon 53+900
7.21 1.00 Bolon 53+900
5.58 1.00 Bolon 53+900
4.07 1.00 Bolon 53+900
6.57 1.00 Bolon 53+900
5.15 1.00 Bolon 53+901
3.26 1.00 Bolon 53+901
5.95 1.00 Bolon 53+902
5.52 1.00 Bolon 53+902
3.25 1.00 Bolon 53+903
6.53 1.00 Bolon 53+903
5.03 1.00 Bolon 53+904
4.27 1.00 Bolon 53+900
5.89 1.00 Bolon 53+900
6.44 1.00 Bolon 53+900
5.83 1.00 Bolon 53+900
5.10 1.00 Bolon 53+900
5.67 1.00 Bolon 53+900
4.53 1.00 Bolon 53+900
5.63 1.00 Bolon 54+100
5.80 1.00 Bolon 54+100
4.48 1.00 Bolon 54+100
5.01 1.00 Bolon 54+100
6.86 1.00 Bolon 54+100
6.88 1.00 Bolon 54+100
5.39 1.00 Bolon 54+100
8.68 1.00 Bolon 54+100
5.89 1.00 Bolon 54+100
6.52 1.00 Bolon 54+100
6.60 1.00 Bolon 54+100
7.31 1.00 Bolon 54+100
6.87 1.00 Bolon 54+100
4.47 1.00 Bolon 54+100
5.27 1.00 Bolon 54+100
5.27 1.00 Bolon 54+100
6.20 1.00 Bolon 54+100
3.65 1.00 Bolon 54+100
5.92 1.00 Bolon 54+100
4.68 1.00 Bolon 54+100
4.69 1.00 Bolon 54+100
4.75 1.00 Bolon 54+100
5.16 1.00 Bolon 54+100
6.39 1.00 Bolon 54+100
6.38 1.00 Bolon 54+100
4.43 1.00 Bolon 54+200
6.37 1.00 Bolon 54+200
5.07 1.00 Bolon 54+200
4.75 1.00 Bolon 54+200
6.64 1.00 Bolon 54+200
5.70 1.00 Bolon 54+200
6.64 1.00 Bolon 54+200
6.42 1.00 Bolon 54+200
5.81 1.00 Bolon 54+200
5.06 1.00 Bolon 54+200
0.13 1.00 Bolon 54+200
6.58 1.00 Bolon 54+200
3.05 1.00 Bolon 54+200
4.76 1.00 Bolon 54+200
7.74 1.00 Bolon 54+200
6.23 1.00 Bolon 54+200
6.11 1.00 Bolon 54+200
5.87 1.00 Bolon 54+200
3.98 1.00 Bolon 54+200
7.20 1.00 Bolon 54+200
5.48 1.00 Bolon 54+200
6.88 1.00 Bolon 54+200
6.38 1.00 Bolon 54+200
5.64 1.00 Bolon 54+200
7.28 1.00 Bolon 54+200
5.73 1.00 Bolon 54+200
4.97 1.00 Bolon 54+200
4.51 1.00 Bolon 54+200
7.27 1.00 Bolon 54+200
4.81 1.00 Bolon 54+200
7.00 1.00 Bolon 54+200
5.51 1.00 Bolon 54+200
6.33 1.00 Bolon 54+200
5.72 1.00 Bolon 54+200
4.77 1.00 Bolon 54+200
5.90 1.00 Bolon 54+200
5.06 1.00 Bolon 54+200
3.61 1.00 Bolon 54+200
5.19 1.00 Bolon 54+200
4.43 1.00 Bolon 54+200
6.17 1.00 Bolon 54+200
4.43 1.00 Bolon 54+200
4.17 1.00 Bolon 54+200
4.05 1.00 Bolon 54+200
6.24 1.00 Bolon 54+200
6.94 1.00 Bolon 54+200
4.25 1.00 Bolon 54+200
5.51 1.00 Bolon 54+200
5.75 1.00 Bolon 54+200
5.21 1.00 Bolon 54+200
5.32 1.00 Bolon 54+200
6.57 1.00 Bolon 54+200
3.83 1.00 Bolon 54+200
6.46 1.00 Bolon 54+200
5.81 1.00 Bolon 54+200
5.51 1.00 Bolon 54+200
5.92 1.00 Bolon 54+200
4.91 1.00 Bolon 54+200
4.89 1.00 Bolon 54+200
4.04 1.00 Bolon 54+200
5.85 1.00 Bolon 54+200
5.25 1.00 Bolon 54+200
3.75 1.00 Bolon 54+200
6.16 1.00 Bolon 54+200
5.24 1.00 Bolon 53+900
6.48 1.00 Bolon 53+900
4.47 1.00 Bolon 53+901
6.29 1.00 Bolon 53+901
5.63 1.00 Bolon 53+902
5.95 1.00 Bolon 53+902
5.65 1.00 Bolon 53+903
5.85 1.00 Bolon 53+903
5.56 1.00 Bolon 53+904
5.67 1.00 Bolon 53+900
6.25 1.00 Bolon 53+900
5.98 1.00 Bolon 53+900
3.43 1.00 Bolon 53+900
3.44 1.00 Bolon 53+900
3.93 1.00 Bolon 53+900
6.47 1.00 Bolon 53+900
5.65 1.00 Bolon 54+100
5.85 1.00 Bolon 54+100
5.31 1.00 Bolon 54+100
6.45 1.00 Bolon 54+100
5.37 1.00 Bolon 54+100
5.76 1.00 Bolon 54+100
5.97 1.00 Bolon 54+100
5.24 1.00 Bolon 54+100
6.09 1.00 Bolon 54+100
5.26 1.00 Bolon 54+100
5.92 1.00 Bolon 54+100
4.55 1.00 Bolon 54+100
6.63 1.00 Bolon 54+100
5.77 1.00 Bolon 54+100
5.45 1.00 Bolon 54+100
5.74 1.00 Bolon 54+100
6.20 1.00 Bolon 54+100
4.07 1.00 Bolon 54+100
5.29 1.00 Bolon 54+100
4.30 1.00 Bolon 54+100
5.68 1.00 Bolon 54+100
4.99 1.00 Bolon 54+100
4.31 1.00 Bolon 54+100
5.71 1.00 Bolon 54+200
5.61 1.00 Bolon 54+200
6.53 1.00 Bolon 54+200
3.99 1.00 Bolon 54+200
6.90 1.00 Bolon 54+200
5.89 1.00 Bolon 54+200
6.64 1.00 Bolon 54+200
6.23 1.00 Bolon 54+200
7.18 1.00 Bolon 54+200
5.89 1.00 Bolon 54+200
5.29 1.00 Bolon 54+200
5.47 1.00 Bolon 54+200
6.48 1.00 Bolon 54+200
7.53 1.00 Bolon 54+200
6.46 1.00 Bolon 54+200
6.74 1.00 Bolon 54+200
4.96 1.00 Bolon 54+200
7.08 1.00 Bolon 54+200
5.86 1.00 Bolon 54+200
3.91 1.00 Bolon 54+200
6.55 1.00 Bolon 54+200
4.87 1.00 Bolon 54+200
7.31 1.00 Bolon 54+200
7.52 1.00 Bolon 54+200
5.86 1.00 Bolon 54+200
5.65 1.00 Bolon 54+200
4.63 1.00 Bolon 54+200
6.36 1.00 Bolon 54+200
5.01 1.00 Bolon 54+200
4.82 1.00 Bolon 54+200
6.36 1.00 Bolon 54+200
7.21 1.00 Bolon 54+200
5.87 1.00 Bolon 54+200
6.78 1.00 Bolon 54+200
3.90 1.00 Bolon 54+200
3.74 1.00 Bolon 54+200
6.95 1.00 Bolon 54+200
6.31 1.00 Bolon 54+200
5.73 1.00 Bolon 54+200
5.44 1.00 Bolon 54+200
5.45 1.00 Bolon 54+200
6.71 1.00 Bolon 54+200
5.76 1.00 Bolon 54+200
8.04 1.00 Bolon 54+200
4.94 1.00 Bolon 54+200
7.62 1.00 Bolon 54+200
6.27 1.00 Bolon 54+200
4.56 1.00 Bolon 54+200
6.12 1.00 Bolon 54+200
4.93 1.00 Bolon 54+200
3.89 1.00 Bolon 54+200
5.47 1.00 Bolon 54+200
6.61 1.00 Bolon 54+200
7.80 1.00 Bolon 54+200
6.35 1.00 Bolon 54+200
6.20 1.00 Bolon 54+200
4.83 1.00 Bolon 54+200
6.63 1.00 Bolon 54+200
3.60 1.00 Bolon 54+200
6.37 1.00 Bolon 54+200
5.55 1.00 Bolon 54+200
6.31 1.00 Bolon 54+200
6.00 1.00 Bolon 54+200
5.58 1.00 Bolon 54+200
6.03 1.00 Bolon 54+100
7.27 1.00 Bolon 54+100
5.59 1.00 Bolon 54+100
6.56 1.00 Bolon 54+100
4.04 1.00 Bolon 54+100
6.89 1.00 Bolon 54+100
5.29 1.00 Bolon 54+100
6.25 1.00 Bolon 53+900
6.05 1.00 Bolon 53+900
6.37 1.00 Bolon 53+901
6.80 1.00 Bolon 53+901
5.71 1.00 Bolon 53+902
7.93 1.00 Bolon 53+902
6.64 1.00 Bolon 53+903
5.29 1.00 Bolon 53+903
8.06 1.00 Bolon 53+904
7.34 1.00 Bolon 53+900
5.64 1.00 Bolon 53+900
6.31 1.00 Bolon 53+900
5.40 1.00 Bolon 53+900
6.41 1.00 Bolon 53+900
8.48 1.00 Bolon 53+900
5.47 1.00 Bolon 53+900
5.56 1.00 Bolon 54+100
3.44 1.00 Bolon 54+100
5.92 1.00 Bolon 54+100
6.44 1.00 Bolon 54+100
6.73 1.00 Bolon 54+100
6.28 1.00 Bolon 54+100
7.13 1.00 Bolon 54+100
5.90 1.00 Bolon 54+100
4.79 1.00 Bolon 54+100
5.89 1.00 Bolon 54+100
4.66 1.00 Bolon 54+100
6.65 1.00 Bolon 54+100
5.79 1.00 Bolon 54+100
6.02 1.00 Bolon 54+100
6.14 1.00 Bolon 54+100
5.87 1.00 Bolon 54+100
7.85 1.00 Bolon 54+100
4.87 1.00 Bolon 54+100
0.00 1.00 Bolon 54+100
0.00 1.00 Bolon 54+100
6.67 1.00 Bolon 54+100
7.03 1.00 Bolon 54+100
6.53 1.00 Bolon 54+100
5.66 1.00 Bolon 54+200
3.50 1.00 Bolon 54+200
5.22 1.00 Bolon 54+200
4.99 1.00 Bolon 54+200
5.66 1.00 Bolon 54+200
6.02 1.00 Bolon 54+200
5.16 1.00 Bolon 54+200
4.33 1.00 Bolon 54+200
5.23 1.00 Bolon 53+900
5.12 1.00 Bolon 53+900
7.23 1.00 Bolon 53+901
8.12 1.00 Bolon 53+901
5.91 1.00 Bolon 53+902
4.75 1.00 Bolon 53+902
6.15 1.00 Bolon 53+903
4.30 1.00 Bolon 53+903
5.85 1.00 Bolon 53+904
6.23 1.00 Bolon 53+900
6.30 1.00 Bolon 53+900
4.06 1.00 Bolon 53+900
5.99 1.00 Bolon 53+900
5.15 1.00 Bolon 53+900
0.00 1.00 Bolon 53+900
5.72 1.00 Bolon 53+900
7.51 1.00 Bolon 54+100
7.91 1.00 Bolon 54+100
5.71 1.00 Bolon 54+100
6.46 1.00 Bolon 54+100
7.46 1.00 Bolon 54+100
4.66 1.00 Bolon 54+100
6.79 1.00 Bolon 54+100
6.03 1.00 Bolon 54+100
6.02 1.00 Bolon 54+100
0.00 1.00 Bolon 54+100
4.61 1.00 Bolon 54+100
5.72 1.00 Bolon 54+100
5.40 1.00 Bolon 54+100
5.74 1.00 Bolon 54+100
5.24 1.00 Bolon 54+100
5.16 1.00 Bolon 54+100
6.33 1.00 Bolon 54+100
5.36 1.00 Bolon 54+100
4.87 1.00 Bolon 54+100
7.69 1.00 Bolon 54+100
4.97 1.00 Bolon 54+100
4.25 1.00 Bolon 54+100
6.50 1.00 Bolon 54+100
4.66 1.00 Bolon 54+100
5.55 1.00 Bolon 54+200
6.14 1.00 Bolon 54+200
6.88 1.00 Bolon 54+200
6.84 1.00 Bolon 54+200
6.91 1.00 Bolon 54+200
6.28 1.00 Bolon 54+200
8.14 1.00 Bolon 54+200
5.44 1.00 Bolon 54+200
5.56 1.00 Bolon 54+200
7.21 1.00 Bolon 54+200
5.51 1.00 Bolon 54+200
6.85 1.00 Bolon 54+200
3.77 1.00 Bolon 54+200
6.42 1.00 Bolon 54+200
6.34 1.00 Bolon 54+200
5.92 1.00 Bolon 54+200
6.90 1.00 Bolon 54+200
6.13 1.00 Bolon 54+200
6.41 1.00 Bolon 54+200
6.33 1.00 Bolon 54+200
6.31 1.00 Bolon 54+200
4.71 1.00 Bolon 54+200
6.71 1.00 Bolon 54+200
5.85 1.00 Bolon 54+200
6.05 1.00 Bolon 54+200
5.87 1.00 Bolon 54+200
4.15 1.00 Bolon 54+200
5.54 1.00 Bolon 54+200
7.19 1.00 Bolon 54+200
7.01 1.00 Bolon 54+200
6.60 1.00 Bolon 54+200
5.55 1.00 Bolon 54+200
7.37 1.00 Bolon 54+200
7.63 1.00 Bolon 54+200
4.27 1.00 Bolon 54+200
9.04 1.00 Bolon 54+200
7.04 1.00 Bolon 54+200
6.96 1.00 Bolon 54+200
5.79 1.00 Bolon 54+200
4.59 1.00 Bolon 54+200
6.49 1.00 Bolon 54+200
5.94 1.00 Bolon 54+200
5.22 1.00 Bolon 54+200
4.64 1.00 Bolon 54+200
7.47 1.00 Bolon 54+200
7.17 1.00 Bolon 54+200
4.82 1.00 Bolon 54+200
5.42 1.00 Bolon 54+200
7.25 1.00 Bolon 54+200
6.84 1.00 Bolon 54+200
5.66 1.00 Bolon 54+200
6.03 1.00 Bolon 54+200
5.69 1.00 Bolon 54+200
5.01 1.00 Bolon 54+200
6.54 1.00 Bolon 54+200
6.94 1.00 Bolon 54+200
9.11 1.00 Bolon 54+200
6.24 1.00 Bolon 54+200
6.19 1.00 Bolon 54+200
3.69 1.00 Bolon 54+200
5.78 1.00 Bolon 54+200
7.05 1.00 Bolon 54+200
6.14 1.00 Bolon 54+200
5.89 1.00 Bolon 54+200
5.40 1.00 Bolon 54+200
4.88 1.00 Bolon 54+200
5.96 1.00 Bolon 54+200
6.14 1.00 Bolon 54+200
6.22 1.00 Bolon 54+200
3.99 1.00 Bolon 54+200
6.23 1.00 Bolon 54+200
3.93 1.00 Bolon 54+200
5.73 1.00 Bolon 54+200
6.12 1.00 Bolon 54+200
6.35 1.00 Bolon 54+200
4.97 1.00 Bolon 54+200
5.70 1.00 Bolon 54+200
6.30 1.00 Bolon 54+200
5.71 1.00 Bolon 54+200
5.03 1.00 Bolon 54+200
6.76 1.00 Bolon 54+200
5.72 1.00 Bolon 54+200
0.00 1.00 Bolon 54+200
8.08 1.00 Bolon 54+200
4.00 1.00 Bolon 54+200
5.47 1.00 Bolon 54+200
3.97 1.00 Bolon 54+200
5.67 1.00 Bolon 54+200
5.63 1.00 Bolon 54+200
6.05 1.00 Bolon 54+200
5.69 1.00 Bolon 54+200
6.43 1.00 Bolon 54+200
4.54 1.00 Bolon 53+900
4.51 1.00 Bolon 53+900
6.27 1.00 Bolon 53+901
5.33 1.00 Bolon 53+901
5.88 1.00 Bolon 53+902
5.93 1.00 Bolon 53+902
5.23 1.00 Bolon 53+903
6.09 1.00 Bolon 53+903
5.12 1.00 Bolon 53+904
0.00 1.00 Bolon 53+900
5.88 1.00 Bolon 53+900
5.51 1.00 Bolon 53+900
5.17 1.00 Bolon 53+900
6.13 1.00 Bolon 53+900
7.01 1.00 Bolon 53+900
5.28 1.00 Bolon 53+900
4.04 1.00 Bolon 54+100
5.81 1.00 Bolon 54+100
3.91 1.00 Bolon 54+100
5.73 1.00 Bolon 54+100
5.79 1.00 Bolon 54+100
6.20 1.00 Bolon 54+100
9.02 1.00 Bolon 54+100
6.18 1.00 Bolon 54+100
6.56 1.00 Bolon 54+100
68.00 1.00 Bolon 54+100
7.61 1.00 Bolon 54+100
5.67 1.00 Bolon 54+100
6.24 1.00 Bolon 54+100
5.99 1.00 Bolon 54+100
6.24 1.00 Bolon 54+100
6.44 1.00 Bolon 54+100
5.17 1.00 Bolon 54+100
5.60 1.00 Bolon 54+100
7.02 1.00 Bolon 54+100
4.65 1.00 Bolon 54+100
7.50 1.00 Bolon 54+100
5.20 1.00 Bolon 54+100
7.17 1.00 Bolon 54+100
4.64 1.00 Bolon 54+100
6.33 1.00 Bolon 54+200
5.20 1.00 Bolon 54+200
6.20 1.00 Bolon 54+200
5.32 1.00 Bolon 54+200
6.28 1.00 Bolon 54+200
5.23 1.00 Bolon 54+200
5.21 1.00 Bolon 54+200
4.70 1.00 Bolon 54+200
5.61 1.00 Bolon 54+200
4.17 1.00 Bolon 54+200
6.43 1.00 Bolon 54+200
6.12 1.00 Bolon 54+200
5.98 1.00 Bolon 54+200
5.46 1.00 Bolon 54+200
6.81 1.00 Bolon 54+200
4.81 1.00 Bolon 54+200
4.68 1.00 Bolon 54+200
4.32 1.00 Bolon 54+200
6.38 1.00 Bolon 54+200
5.04 1.00 Bolon 54+200
6.32 1.00 Bolon 54+200
7.28 1.00 Bolon 54+200
5.74 1.00 Bolon 54+200
5.66 1.00 Bolon 54+200
3.52 1.00 Bolon 54+200
4.59 1.00 Bolon 54+200
4.17 1.00 Bolon 54+200
5.77 1.00 Bolon 54+200
5.41 1.00 Bolon 54+200
5.94 1.00 Bolon 54+200
6.99 1.00 Bolon 54+200
5.23 1.00 Bolon 54+200
5.24 1.00 Bolon 54+200
5.95 1.00 Bolon 54+200
6.35 1.00 Bolon 54+200
5.94 1.00 Bolon 54+200
6.64 1.00 Bolon 54+200
4.97 1.00 Bolon 53+900
4.06 1.00 Bolon 53+900
6.03 1.00 Bolon 53+901
5.08 1.00 Bolon 53+901
5.63 1.00 Bolon 53+902
5.76 1.00 Bolon 53+902
3.37 1.00 Bolon 53+903
5.65 1.00 Bolon 53+903
5.37 1.00 Bolon 53+904
6.20 1.00 Bolon 53+900
5.47 1.00 Bolon 53+900
6.64 1.00 Bolon 53+900
5.09 1.00 Bolon 53+900
4.50 1.00 Bolon 53+900
6.12 1.00 Bolon 53+900
5.51 1.00 Bolon 53+900
6.66 1.00 Bolon 54+100
4.44 1.00 Bolon 54+100
5.66 1.00 Bolon 54+100
7.40 1.00 Bolon 54+100
6.06 1.00 Bolon 54+100
7.28 1.00 Bolon 54+100
6.13 1.00 Bolon 54+100
5.66 1.00 Bolon 54+100
4.48 1.00 Bolon 54+100
6.22 1.00 Bolon 54+100
6.41 1.00 Bolon 54+100
5.72 1.00 Bolon 54+100
3.75 1.00 Bolon 54+100
5.93 1.00 Bolon 54+100
5.84 1.00 Bolon 54+100
5.03 1.00 Bolon 54+100
6.22 1.00 Bolon 54+100
6.36 1.00 Bolon 54+100
5.78 1.00 Bolon 54+100
5.96 1.00 Bolon 54+100
7.47 1.00 Bolon 54+100
7.82 1.00 Bolon 54+100
7.08 1.00 Bolon 54+100
7.96 1.00 Bolon 54+100
6.83 1.00 Bolon 54+100
6.40 1.00 Bolon 54+100
7.55 1.00 Bolon 54+200
6.49 1.00 Bolon 54+200
6.05 1.00 Bolon 54+200
7.59 1.00 Bolon 54+200
5.96 1.00 Bolon 54+200
4.03 1.00 Bolon 54+200
6.79 1.00 Bolon 54+200
6.49 1.00 Bolon 54+200
6.51 1.00 Bolon 54+200
6.86 1.00 Bolon 54+200
7.45 1.00 Bolon 54+200
7.36 1.00 Bolon 54+200
7.37 1.00 Bolon 54+200
7.09 1.00 Bolon 54+200
6.13 1.00 Bolon 54+200
7.73 1.00 Bolon 54+200
6.17 1.00 Bolon 54+200
7.93 1.00 Bolon 54+200
5.04 1.00 Bolon 54+200
6.91 1.00 Bolon 54+200
4.87 1.00 Bolon 54+200
6.99 1.00 Bolon 54+200
7.11 1.00 Bolon 54+200
7.51 1.00 Bolon 54+200
5.32 1.00 Bolon 54+200
5.96 1.00 Bolon 54+200
5.90 1.00 Bolon 54+200
5.99 1.00 Bolon 54+200
6.24 1.00 Bolon 54+200
5.10 1.00 Bolon 54+200
7.34 1.00 Bolon 54+200
6.31 1.00 Bolon 54+200
3.64 1.00 Bolon 54+200
7.70 1.00 Bolon 54+200
6.01 1.00 Bolon 54+200
5.89 1.00 Bolon 54+200
4.89 1.00 Bolon 54+200
6.38 1.00 Bolon 54+200
5.71 1.00 Bolon 54+200
5.64 1.00 Bolon 54+200
6.37 1.00 Bolon 54+200
6.24 1.00 Bolon 54+200
7.57 1.00 Bolon 54+200
7.82 1.00 Bolon 54+200
6.95 1.00 Bolon 54+200
5.72 1.00 Bolon 54+200
5.31 1.00 Bolon 54+200
5.40 1.00 Bolon 54+200
5.89 1.00 Bolon 54+200
3.96 1.00 Bolon 54+200
6.27 1.00 Bolon 54+200
4.65 1.00 Bolon 54+200
4.25 1.00 Bolon 54+200
6.95 1.00 Bolon 54+200
2.51 1.00 Bolon 54+200
5.41 1.00 Bolon 54+200
6.31 1.00 Bolon 54+200
6.72 1.00 Bolon 54+200
5.91 1.00 Bolon 54+200
6.08 1.00 Bolon 54+200
6.37 1.00 Bolon 54+200
6.87 1.00 Bolon 54+200
5.65 1.00 Bolon 54+200
6.35 1.00 Bolon 54+200
4.15 1.00 Bolon 53+900
5.12 1.00 Bolon 53+900
4.59 1.00 Bolon 53+901
5.84 1.00 Bolon 53+901
6.18 1.00 Bolon 53+902
4.61 1.00 Bolon 53+902
6.30 1.00 Bolon 53+903
5.52 1.00 Bolon 53+903
5.51 1.00 Bolon 53+904
5.62 1.00 Bolon 53+900
6.24 1.00 Bolon 53+900
4.79 1.00 Bolon 53+900
6.07 1.00 Bolon 53+900
6.00 1.00 Bolon 53+900
6.31 1.00 Bolon 53+900
6.77 1.00 Bolon 53+900
2.51 1.00 Bolon 54+100
6.48 1.00 Bolon 54+100
4.76 1.00 Bolon 54+100
7.62 1.00 Bolon 54+100
7.08 1.00 Bolon 54+100
6.44 1.00 Bolon 54+100
6.48 1.00 Bolon 54+100
5.00 1.00 Bolon 54+100
6.16 1.00 Bolon 54+100
5.04 1.00 Bolon 54+100
5.11 1.00 Bolon 54+100
5.73 1.00 Bolon 54+100
6.59 1.00 Bolon 54+100
6.03 1.00 Bolon 54+100
7.48 1.00 Bolon 54+100
5.79 1.00 Bolon 54+100
5.49 1.00 Bolon 54+100
4.96 1.00 Bolon 54+100
5.86 1.00 Bolon 54+100
6.87 1.00 Bolon 54+100
6.45 1.00 Bolon 54+100
6.08 1.00 Bolon 54+100
5.84 1.00 Bolon 54+100
7.11 1.00 Bolon 54+100
4.94 1.00 Bolon 54+100
6.88 1.00 Bolon 54+100
6.61 1.00 Bolon 54+200
5.33 1.00 Bolon 54+200
5.11 1.00 Bolon 54+200
7.58 1.00 Bolon 54+200
6.89 1.00 Bolon 54+200
6.27 1.00 Bolon 54+200
5.87 1.00 Bolon 54+200
6.80 1.00 Bolon 54+200
6.27 1.00 Bolon 54+200
6.31 1.00 Bolon 54+200
7.63 1.00 Bolon 54+200
5.40 1.00 Bolon 54+200
7.01 1.00 Bolon 54+200
5.88 1.00 Bolon 54+200
8.77 1.00 Bolon 54+200
7.12 1.00 Bolon 54+200
6.16 1.00 Bolon 54+200
4.06 1.00 Bolon 54+200
4.91 1.00 Bolon 54+200
5.16 1.00 Bolon 54+200
5.32 1.00 Bolon 54+200
5.03 1.00 Bolon 54+200
4.17 1.00 Bolon 54+200
5.23 1.00 Bolon 54+200
6.40 1.00 Bolon 54+200
7.71 1.00 Bolon 54+200
6.96 1.00 Bolon 54+200
4.84 1.00 Bolon 54+200
6.25 1.00 Bolon 54+200
7.53 1.00 Bolon 54+200
5.55 1.00 Bolon 54+200
7.29 1.00 Bolon 54+200
6.76 1.00 Bolon 54+200
5.19 1.00 Bolon 54+200
5.53 1.00 Bolon 54+200
4.89 1.00 Bolon 54+200
5.69 1.00 Bolon 54+200
5.37 1.00 Bolon 54+200
5.17 1.00 Bolon 54+200
5.87 1.00 Bolon 54+200
6.71 1.00 Bolon 54+200
4.69 1.00 Bolon 54+200
6.90 1.00 Bolon 54+200
0.32 1.00 Bolon 54+200
5.61 1.00 Bolon 54+200
6.27 1.00 Bolon 54+200
5.73 1.00 Bolon 54+200
5.85 1.00 Bolon 54+200
6.17 1.00 Bolon 54+200
5.25 1.00 Bolon 54+200
6.49 1.00 Bolon 54+200
7.93 1.00 Bolon 53+900
5.46 1.00 Bolon 53+900
6.57 1.00 Bolon 53+901
8.11 1.00 Bolon 53+901
6.84 1.00 Bolon 53+902
6.73 1.00 Bolon 53+902
4.79 1.00 Bolon 53+903
6.60 1.00 Bolon 53+903
7.70 1.00 Bolon 53+904
8.92 1.00 Bolon 53+900
6.13 1.00 Bolon 53+900
7.80 1.00 Bolon 53+900
6.08 1.00 Bolon 53+900
6.50 1.00 Bolon 53+900
5.88 1.00 Bolon 53+900
6.77 1.00 Bolon 53+900
4.90 1.00 Bolon 54+100
6.20 1.00 Bolon 54+100
6.07 1.00 Bolon 54+100
5.17 1.00 Bolon 54+100
7.09 1.00 Bolon 54+100
6.28 1.00 Bolon 54+100
6.55 1.00 Bolon 54+100
8.63 1.00 Bolon 54+100
7.07 1.00 Bolon 54+100
7.15 1.00 Bolon 54+100
6.57 1.00 Bolon 54+100
6.34 1.00 Bolon 54+100
6.91 1.00 Bolon 54+100
7.44 1.00 Bolon 54+100
4.75 1.00 Bolon 54+100
6.13 1.00 Bolon 54+100
6.96 1.00 Bolon 54+100
6.35 1.00 Bolon 54+100
5.17 1.00 Bolon 54+100
6.26 1.00 Bolon 54+100
5.95 1.00 Bolon 54+100
5.24 1.00 Bolon 54+100
8.03 1.00 Bolon 54+100
5.68 1.00 Bolon 54+100
5.25 1.00 Bolon 54+100
4.20 1.00 Bolon 54+100
6.19 1.00 Bolon 54+200
6.24 1.00 Bolon 54+200
6.20 1.00 Bolon 54+200
6.14 1.00 Bolon 54+200
6.81 1.00 Bolon 54+200
4.15 1.00 Bolon 54+200
5.32 1.00 Bolon 54+200
5.12 1.00 Bolon 54+200
6.23 1.00 Bolon 54+200
6.31 1.00 Bolon 54+200
7.63 1.00 Bolon 54+200
5.40 1.00 Bolon 54+200
7.01 1.00 Bolon 54+200
5.88 1.00 Bolon 54+200
0.00 1.00 Bolon 54+200
6.80 1.00 Bolon 54+200
6.38 1.00 Bolon 54+200
7.12 1.00 Bolon 54+200
4.11 1.00 Bolon 54+200
4.11 1.00 Bolon 54+200
6.86 1.00 Bolon 54+200
6.43 1.00 Bolon 54+200
4.75 1.00 Bolon 54+200
5.60 1.00 Bolon 54+200
5.69 1.00 Bolon 54+200
6.19 1.00 Bolon 54+200
6.94 1.00 Bolon 54+200
4.32 1.00 Bolon 54+200
5.39 1.00 Bolon 54+200
4.36 1.00 Bolon 54+200
3.57 1.00 Bolon 54+200
5.86 1.00 Bolon 54+200
5.36 1.00 Bolon 54+200
4.60 1.00 Bolon 54+200
6.45 1.00 Bolon 54+200
6.26 1.00 Bolon 54+200
6.11 1.00 Bolon 54+200
6.33 1.00 Bolon 54+200
5.27 1.00 Bolon 54+200
5.56 1.00 Bolon 54+200
5.27 1.00 Bolon 54+200
6.09 1.00 Bolon 54+200
5.83 1.00 Bolon 54+200
7.20 1.00 Bolon 54+200
5.88 1.00 Bolon 54+200
6.53 1.00 Bolon 54+200
6.37 1.00 Bolon 53+900
4.93 1.00 Bolon 53+900
5.62 1.00 Bolon 53+901
6.47 1.00 Bolon 53+901
7.55 1.00 Bolon 53+902
6.37 1.00 Bolon 53+902
6.34 1.00 Bolon 53+903
7.82 1.00 Bolon 53+903
6.81 1.00 Bolon 53+904
6.15 1.00 Bolon 53+900
4.63 1.00 Bolon 53+900
5.37 1.00 Bolon 53+900
7.32 1.00 Bolon 53+900
5.08 1.00 Bolon 53+900
6.94 1.00 Bolon 53+900
6.03 1.00 Bolon 53+900
7.81 1.00 Bolon 54+100
7.52 1.00 Bolon 54+100
6.00 1.00 Bolon 54+100
6.28 1.00 Bolon 54+100
6.89 1.00 Bolon 54+100
6.14 1.00 Bolon 54+100
5.27 1.00 Bolon 54+100
6.67 1.00 Bolon 54+100
7.72 1.00 Bolon 54+100
6.24 1.00 Bolon 54+100
5.71 1.00 Bolon 54+100
4.90 1.00 Bolon 54+100
0.00 1.00 Bolon 54+100
5.60 1.00 Bolon 54+100
6.25 1.00 Bolon 54+100
6.75 1.00 Bolon 54+100
6.43 1.00 Bolon 54+100
5.85 1.00 Bolon 54+100
7.68 1.00 Bolon 54+100
4.81 1.00 Bolon 54+100
6.86 1.00 Bolon 54+100
4.89 1.00 Bolon 54+100
7.23 1.00 Bolon 54+100
4.51 1.00 Bolon 54+100
5.17 1.00 Bolon 54+100
6.63 1.00 Bolon 54+100
6.28 1.00 Bolon 54+200
4.29 1.00 Bolon 54+200
4.56 1.00 Bolon 54+200
8.26 1.00 Bolon 54+200
5.30 1.00 Bolon 54+200
4.32 1.00 Bolon 54+200
6.55 1.00 Bolon 54+200
4.47 1.00 Bolon 54+200
3.77 1.00 Bolon 54+200
4.09 1.00 Bolon 54+200
7.89 1.00 Bolon 54+200
5.62 1.00 Bolon 54+200
5.25 1.00 Bolon 54+200
6.74 1.00 Bolon 54+200
5.39 1.00 Bolon 54+200
6.18 2,421.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3) Viajes Material Estac. Destino
12/9/2021 3454 30365 23,600.00 2,750.00 8.58 1.00 Bolon 52+070
12/9/2021 3460 30296 25,570.00 2,750.00 9.30 1.00 Bolon 52+070
12/9/2021 3461 30275 21,200.00 2,750.00 7.71 1.00 Bolon 52+300
12/9/2021 3463 30273 17,760.00 2,750.00 6.46 1.00 Bolon 52+300
12/9/2021 3462 30273 22,740.00 2,750.00 8.27 1.00 Bolon 52+300
12/11/2021 3464 30360 10,670.00 2,750.00 3.88 1.00 Bolon 52+300
12/11/2021 3465 30358 17,670.00 2,750.00 6.43 1.00 Bolon 52+300
12/11/2021 3467 30274 17,230.00 2,750.00 6.27 1.00 Bolon 52+300
12/11/2021 3466 30273 16,610.00 2,750.00 6.04 1.00 Bolon 52+300
12/11/2021 3468 30275 18,560.00 2,750.00 6.75 1.00 Bolon 52+300
12/11/2021 3467 30303 18,150.00 2,750.00 6.60 1.00 Bolon 52+300
12/11/2021 3471 30294 13,500.00 2,750.00 4.91 1.00 Bolon 52+300
12/11/2021 3473 30300 16,690.00 2,750.00 6.07 1.00 Bolon 52+300
12/11/2021 3470 30365 19,270.00 2,750.00 7.01 1.00 Bolon 52+300
12/11/2021 3472 30358 13,440.00 2,750.00 4.89 1.00 Bolon 52+300
12/11/2021 3474 30360 12,470.00 2,750.00 4.53 1.00 Bolon 52+300
12/11/2021 3481 30358 18,440.00 2,750.00 6.71 1.00 Bolon 52+300
12/11/2021 3477 30365 14,370.00 2,750.00 5.23 1.00 Bolon 52+300
12/11/2021 3475 30273 10,870.00 2,750.00 3.95 1.00 Bolon 52+300
12/11/2021 3482 30300 21,760.00 2,750.00 7.91 1.00 Bolon 52+300
12/11/2021 3478 30275 15,810.00 2,750.00 5.75 1.00 Bolon 52+300
12/11/2021 3476 30296 17,460.00 2,750.00 6.35 1.00 Bolon 52+300
12/11/2021 3477 30303 16,960.00 2,750.00 6.17 1.00 Bolon 52+300
12/11/2021 3483 30296 19,230.00 2,750.00 6.99 1.00 Bolon 52+300
12/11/2021 3485 30365 13,770.00 2,750.00 5.01 1.00 Bolon 52+300
12/11/2021 3480 30274 18,580.00 2,750.00 6.76 1.00 Bolon 52+300
12/11/2021 3484 30299 15,700.00 2,750.00 5.71 1.00 Bolon 52+300
12/16/2021 3506 30296 19,800.00 2,750.00 7.20 1.00 Bolon 52+300
12/16/2021 3510 30300 29,070.00 2,750.00 10.57 1.00 Bolon 52+300
12/16/2021 3511 30366 15,660.00 2,750.00 5.69 1.00 Bolon 52+300
12/16/2021 3507 30299 16,930.00 2,750.00 6.16 1.00 Bolon 53+000
12/16/2021 3512 30294 20,820.00 2,750.00 7.57 1.00 Bolon 53+000
12/16/2021 3513 30296 20,420.00 2,750.00 7.43 1.00 Bolon 53+000
12/16/2021 3500 30360 13,960.00 2,750.00 5.08 1.00 Bolon 53+000
12/16/2021 3514 30275 15,590.00 2,750.00 5.67 1.00 Bolon 53+000
12/16/2021 3509 30365 16,440.00 2,750.00 5.98 1.00 Bolon 53+000
12/16/2021 3515 30358 26,850.00 2,750.00 9.76 1.00 Bolon 53+000
12/18/2021 3516 30300 16,260.00 2,750.00 5.91 1.00 Bolon 53+000
12/18/2021 3518 30360 15,930.00 2,750.00 5.79 1.00 Bolon 53+000
12/18/2021 3520 30364 17,900.00 2,750.00 6.51 1.00 Bolon 53+000
12/18/2021 3517 30299 16,540.00 2,750.00 6.01 1.00 Bolon 53+000
12/18/2021 3519 30294 13,980.00 2,750.00 5.08 1.00 Bolon 53+000
12/18/2021 3521 30274 17,320.00 2,750.00 6.30 1.00 Bolon 53+000
12/18/2021 3523 30364 12,580.00 2,750.00 4.57 1.00 Bolon 53+000
12/18/2021 3525 30274 13,730.00 2,750.00 4.99 1.00 Bolon 53+000
12/18/2021 3527 30358 18,060.00 2,750.00 6.57 1.00 Bolon 53+000
12/18/2021 3524 30360 12,580.00 2,750.00 4.57 1.00 Bolon 53+000
12/18/2021 3526 30275 22,270.00 2,750.00 8.10 1.00 Bolon 53+000
12/18/2021 3528 30360 15,890.00 2,750.00 5.78 1.00 Bolon 53+000
12/18/2021 3529 30273 9,380.00 2,750.00 3.41 1.00 Bolon 53+000
12/18/2021 3531 30273 18,050.00 2,750.00 6.56 1.00 Bolon 53+000
12/18/2021 3530 30299 14,880.00 2,750.00 5.41 1.00 Bolon 53+000
12/12/2021 3486 30303 16,960.00 2,750.00 6.17 1.00 Bolon 53+000
12/12/2021 3480 30296 16,860.00 2,750.00 6.13 1.00 Bolon 53+000
12/12/2021 3490 30299 18,600.00 2,750.00 6.76 1.00 Bolon 53+000
12/12/2021 3487 30365 16,200.00 2,750.00 5.89 1.00 Bolon 53+000
12/12/2021 3489 30300 17,320.00 2,750.00 6.30 1.00 Bolon 53+000
12/12/2021 3491 30275 19,610.00 2,750.00 7.13 1.00 Bolon 53+000
12/12/2021 3492 30296 18,120.00 2,750.00 6.59 1.00 Bolon 53+000
12/12/2021 3495 30294 17,090.00 2,750.00 6.21 1.00 Bolon 53+000
12/9/2021 3450 30303 20,820.00 2,750.00 7.57 1.00 Bolon 53+000
12/12/2021 3493 30365 15,168.00 2,750.00 5.52 1.00 Bolon 53+000
12/12/2021 3496 30360 12,500.00 2,750.00 4.55 1.00 Bolon 53+000
12/9/2021 3451 30294 23,420.00 2,750.00 8.52 1.00 Bolon 53+000
12/9/2021 3452 30299 23,080.00 2,750.00 8.39 1.00 Bolon 53+000
12/13/2021 3497 30365 16,990.00 2,750.00 6.18 1.00 Bolon 53+000
12/13/2021 3499 30303 21,540.00 2,750.00 7.83 1.00 Bolon 53+000
12/9/2021 3453 30358 20,350.00 2,750.00 7.40 1.00 Bolon 53+000
12/13/2021 3498 30299 19,730.00 2,750.00 7.17 1.00 Bolon 53+000
12/13/2021 3500 30300 18,520.00 2,750.00 6.73 1.00 Bolon 53+000
12/13/2021 3501 30296 23,640.00 2,750.00 8.60 1.00 Bolon 53+000
12/13/2021 3502 30299 17,480.00 2,750.00 6.36 1.00 Bolon 53+000
12/15/2021 3504 30360 19,720.00 2,750.00 7.17 1.00 Bolon 53+000
12/15/2021 3505 30296 19,260.00 2,750.00 7.00 1.00 Bolon 53+000
12/15/2021 3494 30294 16,840.00 2,750.00 6.12 1.00 Bolon 53+000
1,328,788.00 483.20 75.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3) Viajes Material Estac. Destino
2/1/2022 3676 30275 21,650.00 2,750.00 7.87 1.00 Bolon 52+070
2/1/2022 3678 30243 18,030.00 2,750.00 6.56 1.00 Bolon 52+070
2/1/2022 3677 30303 14,850.00 2,750.00 5.40 1.00 Bolon 52+300
2/1/2022 3679 30358 20,180.00 2,750.00 7.34 1.00 Bolon 52+300
2/1/2022 3680 30184 14,590.00 2,750.00 5.31 1.00 Bolon 52+300
2/1/2022 3682 30303 18,060.00 2,750.00 6.57 1.00 Bolon 52+300
2/1/2022 3681 30296 13,250.00 2,750.00 4.82 1.00 Bolon 52+300
2/1/2022 3683 21740 21,740.00 2,750.00 7.91 1.00 Bolon 52+300
2/1/2022 3684 30360 27,100.00 2,750.00 9.85 1.00 Bolon 52+300
2/1/2022 3686 30350 23,610.00 2,750.00 8.59 1.00 Bolon 52+300
2/1/2022 3688 30104 9,950.00 2,750.00 3.62 1.00 Bolon 52+300
2/1/2022 3685 30296 19,280.00 2,750.00 7.01 1.00 Bolon 52+300
2/1/2022 3607 30360 22,660.00 2,750.00 8.24 1.00 Bolon 52+300
2/2/2022 3689 30296 20,330.00 2,750.00 7.39 1.00 Bolon 52+300
2/2/2022 3690 30275 19,160.00 2,750.00 6.97 1.00 Bolon 52+300
2/2/2022 3692 30184 13,350.00 2,750.00 4.85 1.00 Bolon 52+300
2/2/2022 3694 30275 21,660.00 2,750.00 7.88 1.00 Bolon 52+300
2/2/2022 3691 30360 22,870.00 2,750.00 8.32 1.00 Bolon 52+300
2/2/2022 3693 30297 27,510.00 2,750.00 10.00 1.00 Bolon 52+300
2/2/2022 3695 30274 23,670.00 2,750.00 8.61 1.00 Bolon 52+300
2/2/2022 3698 30184 17,640.00 2,750.00 6.41 1.00 Bolon 52+300
2/2/2022 3700 30243 22,110.00 2,750.00 8.04 1.00 Bolon 52+300
2/2/2022 3702 30297 26,520.00 2,750.00 9.64 1.00 Bolon 52+300
2/2/2022 3699 30360 24,360.00 2,750.00 8.86 1.00 Bolon 52+300
2/2/2022 3701 30273 29,140.00 2,750.00 10.60 1.00 Bolon 52+300
2/2/2022 3703 30275 20,350.00 2,750.00 7.40 1.00 Bolon 52+300
2/2/2022 3704 30303 24,570.00 2,750.00 8.93 1.00 Bolon 52+300
2/2/2022 3706 30350 15,510.00 2,750.00 5.64 1.00 Bolon 52+300
2/2/2022 3708 30297 21,110.00 2,750.00 7.68 1.00 Bolon 52+300
2/2/2022 3705 30274 10,330.00 2,750.00 3.76 1.00 Bolon 52+300
2/2/2022 3707 30360 17,290.00 2,750.00 6.29 1.00 Bolon 53+000
2/2/2022 3709 30296 17,830.00 2,750.00 6.48 1.00 Bolon 53+000
2/2/2022 3710 30275 19,430.00 2,750.00 7.07 1.00 Bolon 53+000
2/2/2022 3712 30350 27,000.00 2,750.00 9.82 1.00 Bolon 53+000
2/2/2022 3711 30273 19,860.00 2,750.00 7.22 1.00 Bolon 53+000
2/2/2022 3713 30303 22,350.00 2,750.00 8.13 1.00 Bolon 53+000
2/2/2022 3714 30274 21,190.00 2,750.00 7.71 1.00 Bolon 53+000
2/2/2022 3716 30360 25,730.00 2,750.00 9.36 1.00 Bolon 53+000
2/2/2022 3710 30275 22,060.00 2,750.00 8.02 1.00 Bolon 53+000
2/2/2022 3715 30297 20,040.00 2,750.00 7.29 1.00 Bolon 53+000
2/2/2022 3717 30303 22,970.00 2,750.00 8.35 1.00 Bolon 53+000
2/2/2022 3719 30273 20,570.00 2,750.00 7.48 1.00 Bolon 53+000
2/2/2022 3720 30350 19,110.00 2,750.00 6.95 1.00 Bolon 53+000
2/2/2022 3722 30365 9,730.00 2,750.00 3.54 1.00 Bolon 53+000
2/3/2022 3724 30303 20,270.00 2,750.00 7.37 1.00 Bolon 53+000
4/3/2022 3721 30274 7,850.00 2,750.00 2.85 1.00 Bolon 53+000
2/3/2022 3723 30243 17,460.00 2,750.00 6.35 1.00 Bolon 53+000
2/3/2022 3753 30275 18,880.00 2,750.00 6.87 1.00 Bolon 53+000
2/3/2022 3732 30243 13,560.00 2,750.00 4.93 1.00 Bolon 53+000
2/3/2022 3734 30358 19,730.00 2,750.00 7.17 1.00 Bolon 53+000
2/3/2022 3754 30303 15,650.00 2,750.00 5.69 1.00 Bolon 53+000
2/3/2022 3733 30364 19,900.00 2,750.00 7.24 1.00 Bolon 53+000
2/3/2022 3735 30296 20,000.00 2,750.00 7.27 1.00 Bolon 53+000
2/3/2022 3736 30303 20,910.00 2,750.00 7.60 1.00 Bolon 53+000
2/3/2022 3739 30296 20,250.00 2,750.00 7.36 1.00 Bolon 53+000
2/3/2022 3740 30273 15,940.00 2,750.00 5.80 1.00 Bolon 53+000
2/3/2022 3737 30299 20,220.00 2,750.00 7.35 1.00 Bolon 53+000
2/3/2022 3739 30299 17,590.00 2,750.00 6.40 1.00 Bolon 53+000
2/3/2022 3742 30243 17,980.00 2,750.00 6.54 1.00 Bolon 53+000
2/3/2022 3726 30273 14,670.00 2,750.00 5.33 1.00 Bolon 53+000
2/3/2022 3720 30296 21,410.00 2,750.00 7.79 1.00 Bolon 53+000
2/3/2022 3730 30297 18,300.00 2,750.00 6.65 1.00 Bolon 53+000
2/3/2022 3727 30365 18,860.00 2,750.00 6.86 1.00 Bolon 53+000
2/3/2022 3729 30364 19,620.00 2,750.00 7.13 1.00 Bolon 53+000
2/3/2022 3721 30299 16,540.00 2,750.00 6.01 1.00 Bolon 53+000
2/3/2022 3743 30296 19,570.00 2,750.00 7.12 1.00 Bolon 53+000
2/3/2022 3745 30299 15,960.00 2,750.00 5.80 1.00 Bolon 53+000
2/3/2022 3747 30243 16,760.00 2,750.00 6.09 1.00 Bolon 53+000
2/3/2022 3744 30273 24,850.00 2,750.00 9.04 1.00 Bolon 53+000
2/3/2022 3746 30303 19,620.00 2,750.00 7.13 1.00 Bolon 53+000
2/3/2022 3748 30184 16,470.00 2,750.00 5.99 1.00 Bolon 53+000
2/3/2022 3749 30299 22,150.00 2,750.00 8.05 1.00 Bolon 53+000
2/3/2022 3751 30299 18,670.00 2,750.00 6.79 1.00 Bolon 53+000
2/3/2022 3752 30273 17,070.00 2,750.00 6.21 1.00 Bolon 53+000
1/23/2022 3664 30358 17,230.00 2,750.00 6.27 1.00 Bolon 53+000
1/23/2022 3660 30360 14,750.00 2,750.00 5.36 1.00 Bolon 53+000
1/23/2022 3665 30274 20,540.00 2,750.00 7.47 1.00 Bolon 53+000
1/23/2022 3667 30274 13,310.00 2,750.00 4.84 1.00 Bolon 53+000
1/19/2022 3603 30275 10,350.00 2,750.00 3.76 1.00 Bolon 53+000
1/19/2022 3605 30299 20,340.00 2,750.00 7.40 1.00 Bolon 53+000
1/19/2022 3684 30296 17,558.00 2,750.00 6.38 1.00 Bolon 53+000
1/19/2022 3606 30303 21,500.00 2,750.00 7.82 1.00 Bolon 53+000
1/19/2022 3607 30275 19,640.00 2,750.00 7.14 1.00 Bolon 53+000
1/19/2022 3608 30365 22,550.00 2,750.00 8.20 1.00 Bolon 53+000
1/17/2022 3575 30273 22,000.00 2,750.00 8.00 1.00 Bolon 53+000
1/17/2022 3601 30303 23,780.00 2,750.00 8.65 1.00 Bolon 53+000
1/17/2022 3576 30299 9,020.00 2,750.00 3.28 1.00 Bolon 53+000
1/17/2022 3602 30299 17,940.00 2,750.00 6.52 1.00 Bolon 53+000
1/18/2022 3589 30296 16,790.00 2,750.00 6.11 1.00 Bolon 53+000
1/18/2022 3579 30296 14,760.00 2,750.00 5.37 1.00 Bolon 53+000
1/18/2022 3590 30275 18,760.00 2,750.00 6.82 1.00 Bolon 53+000
1/18/2022 3580 30303 11,770.00 2,750.00 4.28 1.00 Bolon 53+000
1/18/2022 3595 30275 10,400.00 2,750.00 3.78 1.00 Bolon 53+000
1/18/2022 3597 30299 28,090.00 2,750.00 10.21 1.00 Bolon 53+000
1/18/2022 3599 30104 13,330.00 2,750.00 4.85 1.00 Bolon 53+000
1/18/2022 3596 30303 23,630.00 2,750.00 8.59 1.00 Bolon 53+000
1/18/2022 3598 30275 19,860.00 2,750.00 7.22 1.00 Bolon 53+000
1/18/2022 3600 30296 22,790.00 2,750.00 8.29 1.00 Bolon 53+000
1/9/2022 3537 30275 20,640.00 2,750.00 7.51 1.00 Bolon 53+000
1/9/2022 3539 30358 20,660.00 2,750.00 7.51 1.00 Bolon 53+000
1/9/2022 3540 30296 20,930.00 2,750.00 7.61 1.00 Bolon 53+000
1/9/2022 3538 3096 21,300.00 2,750.00 7.75 1.00 Bolon 53+000
1/9/2022 3540 30296 20,930.00 2,750.00 7.61 1.00 Bolon 53+000
1/9/2022 3540 30296 20,930.00 2,750.00 7.61 1.00 Bolon 53+000
1/7/2022 3532 30360 17,530.00 2,750.00 6.37 1.00 Bolon 53+000
1/7/2022 3534 30366 14,280.00 2,750.00 5.19 1.00 Bolon 53+000
1/7/2022 3536 30358 19,700.00 2,750.00 7.16 1.00 Bolon 53+000
1/7/2022 3533 30274 23,580.00 2,750.00 8.57 1.00 Bolon 53+000
1/7/2022 3535 30296 19,500.00 2,750.00 7.09 1.00 Bolon 53+000
1/16/2022 3546 30274 16,400.00 2,750.00 5.96 1.00 Bolon 53+000
1/16/2022 3548 30303 18,250.00 2,750.00 6.64 1.00 Bolon 53+000
1/16/2022 3547 30358 20,550.00 2,750.00 7.47 1.00 Bolon 53+000
1/16/2022 3549 30300 14,670.00 2,750.00 5.33 1.00 Bolon 53+000
1/17/2022 3550 30365 19,500.00 2,750.00 7.09 1.00 Bolon 53+000
1/17/2022 3552 30360 19,450.00 2,750.00 7.07 1.00 Bolon 53+000
1/17/2022 3554 30274 15,770.00 2,750.00 5.73 1.00 Bolon 53+000
1/17/2022 3551 30296 22,370.00 2,750.00 8.13 1.00 Bolon 53+000
1/17/2022 3553 30273 20,530.00 2,750.00 7.47 1.00 Bolon 53+000
1/17/2022 3555 30303 15,770.00 2,750.00 5.73 1.00 Bolon 53+000
1/17/2022 3556 30358 16,510.00 2,750.00 6.00 1.00 Bolon 53+000
1/17/2022 3561 30350 14,240.00 2,750.00 5.18 1.00 Bolon 53+000
1/17/2022 3563 30273 16,160.00 2,750.00 5.88 1.00 Bolon 53+000
1/17/2022 3557 30294 10,590.00 2,750.00 3.85 1.00 Bolon 53+000
1/17/2022 3556 30358 16,510.00 2,750.00 6.00 1.00 Bolon 53+000
1/17/2022 3561 30350 14,240.00 2,750.00 5.18 1.00 Bolon 53+001
1/17/2022 3563 30273 16,160.00 2,750.00 5.88 1.00 Bolon 53+002
1/17/2022 3557 30294 10,590.00 2,750.00 3.85 1.00 Bolon 53+003
1/17/2022 3562 30274 14,240.00 2,750.00 5.18 1.00 Bolon 53+004
1/17/2022 3564 30303 18,200.00 2,750.00 6.62 1.00 Bolon 53+005
1/17/2022 3565 30299 16,200.00 2,750.00 5.89 1.00 Bolon 53+006
1/17/2022 3550 30365 18,000.00 2,750.00 6.55 1.00 Bolon 53+007
1/17/2022 3567 30275 17,740.00 2,750.00 6.45 1.00 Bolon 53+008
1/17/2022 3566 30296 20,290.00 2,750.00 7.38 1.00 Bolon 53+009
1/17/2022 3559 30275 15,320.00 2,750.00 5.57 1.00 Bolon 53+010
1/17/2022 3568 30273 18,980.00 2,750.00 6.90 1.00 Bolon 53+011
1/17/2022 3571 30358 19,220.00 2,750.00 6.99 1.00 Bolon 53+012
1/17/2022 3573 30303 16,970.00 2,750.00 6.17 1.00 Bolon 53+012
1/17/2022 3572 30275 22,050.00 2,750.00 8.02 1.00 Bolon 53+012
1/17/2022 3574 30296 19,150.00 2,750.00 6.96 1.00 Bolon 53+012
1/17/2022 3569 30299 18,410.00 2,750.00 6.69 1.00 Bolon 53+012
1/17/2022 3577 30303 19,260.00 2,750.00 7.00 1.00 Bolon 53+012
1/17/2022 3560 30275 11,330.00 2,750.00 4.12 1.00 Bolon 53+012
1/17/2022 3570 30296 10,170.00 2,750.00 3.70 1.00 Bolon 53+012
1/17/2022 3578 30275 18,610.00 2,750.00 6.77 1.00 Bolon 53+012
1/12/2022 3541 30360 18,850.00 2,750.00 6.85 1.00 Bolon 53+012
1/16/2022 3544 30365 10,990.00 2,750.00 4.00 1.00 Bolon 53+012
1/12/2022 3542 30358 18,560.00 2,750.00 6.75 1.00 Bolon 53+012
1/16/2022 3545 30360 14,660.00 2,750.00 5.33 1.00 Bolon 53+012
1/18/2022 3501 30275 16,910.00 2,750.00 6.15 1.00 Bolon 53+012
1/18/2022 3503 30299 17,330.00 2,750.00 6.30 1.00 Bolon 53+012
1/18/2022 3505 30296 22,420.00 2,750.00 8.15 1.00 Bolon 53+012
1/18/2022 3582 30273 19,390.00 2,750.00 7.05 1.00 Bolon 53+012
1/18/2022 3584 30243 20,790.00 2,750.00 7.56 1.00 Bolon 53+012
1/18/2022 3586 30184 9,650.00 2,750.00 3.51 1.00 Bolon 53+012
1/18/2022 3587 30383 16,620.00 2,750.00 6.04 1.00 Bolon 53+013
1/18/2022 3591 30303 19,450.00 2,750.00 7.07 1.00 Bolon 53+014
1/18/2022 3593 30296 18,760.00 2,750.00 6.82 1.00 Bolon 53+015
1/18/2022 3588 30275 15,500.00 2,750.00 5.64 1.00 Bolon 53+016
1/18/2022 3592 30184 9,660.00 2,750.00 3.51 1.00 Bolon 53+017
1/18/2022 3594 30299 19,320.00 2,750.00 7.03 1.00 Bolon 53+017
1/19/2022 3609 30243 29,310.00 2,750.00 10.66 1.00 Bolon 53+017
1/19/2022 3613 30303 10,740.00 2,750.00 3.91 1.00 Bolon 53+017
1/19/2022 3611 30360 21,680.00 2,750.00 7.88 1.00 Bolon 53+017
1/19/2022 3610 30358 15,610.00 2,750.00 5.68 1.00 Bolon 53+017
1/19/2022 3614 30133 14,000.00 2,750.00 5.09 1.00 Bolon 53+017
1/19/2022 3612 30358 23,010.00 2,750.00 8.37 1.00 Bolon 53+017
1/19/2022 3615 30365 22,440.00 2,750.00 8.16 1.00 Bolon 53+017
1/19/2022 3617 30365 23,930.00 2,750.00 8.70 1.00 Bolon 53+017
1/19/2022 3619 30243 22,150.00 2,750.00 8.05 1.00 Bolon 53+017
1/19/2022 3616 30299 20,720.00 2,750.00 7.53 1.00 Bolon 53+017
1/19/2022 3618 30303 19,790.00 2,750.00 7.20 1.00 Bolon 53+017
1/19/2022 3620 30184 15,140.00 2,750.00 5.51 1.00 Bolon 53+017
1/19/2022 3621 30275 16,500.00 2,750.00 6.00 1.00 Bolon 53+017
1/19/2022 3623 30133 14,740.00 2,750.00 5.36 1.00 Bolon 53+017
1/19/2022 3622 30303 14,670.00 2,750.00 5.33 1.00 Bolon 53+017
1/19/2022 3624 30243 24,320.00 2,750.00 8.84 1.00 Bolon 53+017
1/19/2022 3625 30133 14,880.00 2,750.00 5.41 1.00 Bolon 53+018
1/19/2022 3627 30184 10,630.00 2,750.00 3.87 1.00 Bolon 53+018
1/19/2022 3626 30296 15,150.00 2,750.00 5.51 1.00 Bolon 53+018
1/19/2022 3625 30133 14,800.00 2,750.00 5.38 1.00 Bolon 53+018
1/19/2022 3627 30104 10,630.00 2,750.00 3.87 1.00 Bolon 53+018
1/19/2022 3626 30296 15,150.00 2,750.00 5.51 1.00 Bolon 53+018
1/19/2022 3628 30275 18,600.00 2,750.00 6.76 1.00 Bolon 53+018
1/19/2022 3635 30275 15,960.00 2,750.00 5.80 1.00 Bolon 53+018
1/20/2022 3639 30275 24,940.00 2,750.00 9.07 1.00 Bolon 53+018
1/20/2022 3639 30275 24,940.00 2,750.00 9.07 1.00 Bolon 53+018
1/20/2022 3637 30299 18,980.00 2,750.00 6.90 1.00 Bolon 53+018
1/20/2022 3636 30296 18,830.00 2,750.00 6.85 1.00 Bolon 53+018
1/20/2022 3640 30133 15,290.00 2,750.00 5.56 1.00 Bolon 53+018
1/20/2022 3638 30133 17,730.00 2,750.00 6.45 1.00 Bolon 53+018
1/20/2022 3629 30275 15,508.00 2,750.00 5.64 1.00 Bolon 53+018
1/20/2022 3631 30303 15,600.00 2,750.00 5.67 1.00 Bolon 53+018
1/20/2022 3633 30133 14,010.00 2,750.00 5.09 1.00 Bolon 53+018
1/20/2022 3630 30296 18,250.00 2,750.00 6.64 1.00 Bolon 53+018
1/20/2022 3632 30299 15,660.00 2,750.00 5.69 1.00 Bolon 53+018
1/20/2022 3634 30133 17,110.00 2,750.00 6.22 1.00 Bolon 53+018
1/21/2022 3643 30275 17,890.00 2,750.00 6.51 1.00 Bolon 53+018
1/21/2022 3645 30275 21,590.00 2,750.00 7.85 1.00 Bolon 53+018
1/21/2022 3647 30296 19,330.00 2,750.00 7.03 1.00 Bolon 53+018
1/21/2022 3644 30296 17,160.00 2,750.00 6.24 1.00 Bolon 53+018
1/21/2022 3646 30275 19,440.00 2,750.00 7.07 1.00 Bolon 53+018
1/21/2022 3640 30296 16,710.00 2,750.00 6.08 1.00 Bolon 53+018
1/21/2022 3649 30303 18,760.00 2,750.00 6.82 1.00 Bolon 53+018
1/21/2022 3651 30296 17,740.00 2,750.00 6.45 1.00 Bolon 53+018
1/21/2022 3653 30133 12,870.00 2,750.00 4.68 1.00 Bolon 53+018
1/21/2022 3650 30303 18,240.00 2,750.00 6.63 1.00 Bolon 53+018
1/21/2022 3652 30275 21,190.00 2,750.00 7.71 1.00 Bolon 53+018
1/21/2022 3654 30303 21,410.00 2,750.00 7.79 1.00 Bolon 53+018
1/21/2022 3655 30296 17,870.00 2,750.00 6.50 1.00 Bolon 53+018
1/21/2022 3657 30133 12,340.00 2,750.00 4.49 1.00 Bolon 53+018
1/21/2022 3659 30303 19,930.00 2,750.00 7.25 1.00 Bolon 53+018
1/21/2022 3656 30275 19,860.00 2,750.00 7.22 1.00 Bolon 53+018
1/21/2022 3658 30296 18,380.00 2,750.00 6.68 1.00 Bolon 53+018
1/21/2022 36360 30275 18,670.00 2,750.00 6.79 1.00 Bolon 53+018
1/21/2022 3661 30133 16,120.00 2,750.00 5.86 1.00 Bolon 53+018
1/22/2022 3662 30303 13,340.00 2,750.00 4.85 1.00 Bolon 53+018
1/22/2022 3663 30299 16,530.00 2,750.00 6.01 1.00 Bolon 53+018
3,965,706.00 1,442.07 217.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3) Viajes Material Estac. Destino
2/22/2022 4223 30299 19,490.00 2,750.00 7.09 1.00 Bolon 52+070
2/22/2022 4224 30275 18,300.00 2,750.00 6.65 1.00 Bolon 52+070
2/22/2022 4225 39294 18,130.00 2,750.00 6.59 1.00 Bolon 52+300
2/22/2022 4226 30296 15,770.00 2,750.00 5.73 1.00 Bolon 52+300
2/22/2022 4227 30273 19,120.00 2,750.00 6.95 1.00 Bolon 52+300
2/22/2022 4223 30365 30,365.00 2,750.00 11.04 1.00 Bolon 52+300
2/22/2022 4229 30184 10,870.00 2,750.00 3.95 1.00 Bolon 52+300
2/22/2022 4230 30299 11,290.00 2,750.00 4.11 1.00 Bolon 52+300
2/22/2022 4231 30275 19,200.00 2,750.00 6.98 1.00 Bolon 52+300
2/22/2022 4232 30300 14,450.00 2,750.00 5.25 1.00 Bolon 52+300
2/22/2022 4233 30365 16,580.00 2,750.00 6.03 1.00 Bolon 52+300
2/22/2022 4234 30294 19,190.00 2,750.00 6.98 1.00 Bolon 52+300
2/22/2022 4235 30184 14,480.00 2,750.00 5.27 1.00 Bolon 52+300
2/22/2022 4237 30273 16,780.00 2,750.00 6.10 1.00 Bolon 52+300
2/22/2022 4236 30296 16,330.00 2,750.00 5.94 1.00 Bolon 52+300
2/22/2022 4237 30273 16,780.00 2,750.00 6.10 1.00 Bolon 52+300
2/22/2022 4238 30300 20,450.00 2,750.00 7.44 1.00 Bolon 52+300
2/22/2022 4239 30365 20,270.00 2,750.00 7.37 1.00 Bolon 52+300
2/22/2022 4241 30299 19,170.00 2,750.00 6.97 1.00 Bolon 52+300
2/22/2022 4240 30275 23,040.00 2,750.00 8.38 1.00 Bolon 52+300
2/22/2022 4242 30133 660.00 2,750.00 0.24 1.00 Bolon 52+300
2/22/2022 4243 30294 20,180.00 2,750.00 7.34 1.00 Bolon 52+300
2/22/2022 4245 30273 17,350.00 2,750.00 6.31 1.00 Bolon 52+300
2/22/2022 4244 30296 18,690.00 2,750.00 6.80 1.00 Bolon 52+300
2/22/2022 4246 30300 19,090.00 2,750.00 6.94 1.00 Bolon 52+300
2/22/2022 4247 30299 18,290.00 2,750.00 6.65 1.00 Bolon 52+300
2/22/2022 4248 30275 19,510.00 2,750.00 7.09 1.00 Bolon 52+300
2/22/2022 4250 30294 19,140.00 2,750.00 6.96 1.00 Bolon 52+300
2/22/2022 4251 30296 17,770.00 2,750.00 6.46 1.00 Bolon 52+300
2/22/2022 4253 30273 19,000.00 2,750.00 6.91 1.00 Bolon 52+300
2/22/2022 4252 30300 20,740.00 2,750.00 7.54 1.00 Bolon 53+000
2/22/2022 4254 30275 22,010.00 2,750.00 8.00 1.00 Bolon 53+000
2/22/2022 4255 30365 22,830.00 2,750.00 8.30 1.00 Bolon 53+000
2/22/2022 4257 30300 18,220.00 2,750.00 6.63 1.00 Bolon 53+000
2/22/2022 4256 30299 17,210.00 2,750.00 6.26 1.00 Bolon 53+000
2/22/2022 4250 30294 23,530.00 2,750.00 8.56 1.00 Bolon 53+000
2/22/2022 4259 30300 16,970.00 2,750.00 6.17 1.00 Bolon 53+000
2/22/2022 4261 30294 14,360.00 2,750.00 5.22 1.00 Bolon 53+000
2/22/2022 4260 30365 16,970.00 2,750.00 6.17 1.00 Bolon 53+000
2/22/2022 4262 30299 370.00 2,750.00 0.13 1.00 Bolon 53+000
2/22/2022 4263 30275 18,120.00 2,750.00 6.59 1.00 Bolon 53+000
2/22/2022 4265 30300 16,470.00 2,750.00 5.99 1.00 Bolon 53+000
2/22/2022 4264 30273 17,570.00 2,750.00 6.39 1.00 Bolon 53+000
2/22/2022 4266 30365 13,450.00 2,750.00 4.89 1.00 Bolon 53+000
2/22/2022 4267 30294 16,050.00 2,750.00 5.84 1.00 Bolon 53+000
2/22/2022 4268 30275 19,910.00 2,750.00 7.24 1.00 Bolon 53+000
2/23/2022 4269 30273 16,180.00 2,750.00 5.88 1.00 Bolon 53+000
2/23/2022 4271 30294 18,670.00 2,750.00 6.79 1.00 Bolon 53+000
2/23/2022 4270 30275 17,000.00 2,750.00 6.18 1.00 Bolon 53+000
2/23/2022 4272 30365 17,180.00 2,750.00 6.25 1.00 Bolon 53+000
2/23/2022 4273 30303 14,860.00 2,750.00 5.40 1.00 Bolon 53+000
2/23/2022 4275 30296 16,900.00 2,750.00 6.15 1.00 Bolon 53+000
2/23/2022 4274 30299 17,110.00 2,750.00 6.22 1.00 Bolon 53+000
2/23/2022 4276 30275 14,840.00 2,750.00 5.40 1.00 Bolon 53+000
2/23/2022 4277 30273 14,220.00 2,750.00 5.17 1.00 Bolon 53+000
2/23/2022 4279 30294 14,300.00 2,750.00 5.20 1.00 Bolon 53+000
2/23/2022 4278 30303 15,090.00 2,750.00 5.49 1.00 Bolon 53+000
2/23/2022 4280 30299 16,620.00 2,750.00 6.04 1.00 Bolon 53+000
2/23/2022 4281 30296 14,340.00 2,750.00 5.21 1.00 Bolon 53+000
2/23/2022 4283 30275 17,730.00 2,750.00 6.45 1.00 Bolon 53+000
2/23/2022 4282 30365 17,150.00 2,750.00 6.24 1.00 Bolon 53+000
2/23/2022 4284 30184 11,640.00 2,750.00 4.23 1.00 Bolon 53+000
2/23/2022 4285 30273 17,970.00 2,750.00 6.53 1.00 Bolon 53+000
2/23/2022 4287 30296 16,590.00 2,750.00 6.03 1.00 Bolon 53+000
2/23/2022 4286 30303 18,930.00 2,750.00 6.88 1.00 Bolon 53+000
2/23/2022 4288 30294 25,910.00 2,750.00 9.42 1.00 Bolon 53+000
2/23/2022 4289 30299 22,220.00 2,750.00 8.08 1.00 Bolon 53+000
2/23/2022 4292 30275 20,010.00 2,750.00 7.28 1.00 Bolon 53+000
2/23/2022 4290 30365 710.00 2,750.00 0.26 1.00 Bolon 53+000
2/23/2022 4293 30299 22,370.00 2,750.00 8.13 1.00 Bolon 53+000
2/23/2022 4294 30273 15,200.00 2,750.00 5.53 1.00 Bolon 53+000
2/23/2022 4296 30300 18,130.00 2,750.00 6.59 1.00 Bolon 53+000
2/23/2022 4295 30296 17,800.00 2,750.00 6.47 1.00 Bolon 53+000
2/23/2022 4277 30297 24,320.00 2,750.00 8.84 1.00 Bolon 53+000
2/23/2022 4298 30275 18,210.00 2,750.00 6.62 1.00 Bolon 53+000
2/23/2022 4300 30365 21,500.00 2,750.00 7.82 1.00 Bolon 53+000
2/23/2022 4299 30299 28,700.00 2,750.00 10.44 1.00 Bolon 53+000
2/23/2022 4301 30294 18,100.00 2,750.00 6.58 1.00 Bolon 53+000
2/23/2022 4302 30273 19,560.00 2,750.00 7.11 1.00 Bolon 53+000
2/23/2022 4304 30296 18,970.00 2,750.00 6.90 1.00 Bolon 53+000
2/23/2022 4303 30303 17,630.00 2,750.00 6.41 1.00 Bolon 53+000
2/23/2022 4305 30300 20,880.00 2,750.00 7.59 1.00 Bolon 53+000
2/23/2022 4306 30275 18,310.00 2,750.00 6.66 1.00 Bolon 53+000
2/23/2022 4308 30365 20,640.00 2,750.00 7.51 1.00 Bolon 53+000
2/23/2022 4307 30299 20,390.00 2,750.00 7.41 1.00 Bolon 53+000
2/23/2022 4309 30294 19,340.00 2,750.00 7.03 1.00 Bolon 53+000
2/23/2022 4310 30273 17,020.00 2,750.00 6.19 1.00 Bolon 53+000
2/23/2022 4312 30296 16,310.00 2,750.00 5.93 1.00 Bolon 53+000
2/23/2022 4311 30300 17,990.00 2,750.00 6.54 1.00 Bolon 53+000
2/23/2022 4313 30303 18,660.00 2,750.00 6.79 1.00 Bolon 53+000
2/23/2022 4314 30299 18,940.00 2,750.00 6.89 1.00 Bolon 53+000
2/23/2022 4316 30275 18,220.00 2,750.00 6.63 1.00 Bolon 53+000
2/23/2022 4315 30294 20,480.00 2,750.00 7.45 1.00 Bolon 53+000
2/23/2022 4317 30365 19,338.00 2,750.00 7.03 1.00 Bolon 53+000
2/24/2022 4318 30299 20,670.00 2,750.00 7.52 1.00 Bolon 53+000
2/24/2022 4320 30273 19,020.00 2,750.00 6.92 1.00 Bolon 53+000
2/24/2022 4319 30294 19,530.00 2,750.00 7.10 1.00 Bolon 53+000
2/24/2022 4321 30275 20,010.00 2,750.00 7.28 1.00 Bolon 53+000
2/24/2022 4322 30296 19,818.00 2,750.00 7.21 1.00 Bolon 53+000
2/24/2022 4324 30365 17,130.00 2,750.00 6.23 1.00 Bolon 53+000
2/24/2022 4323 30303 18,730.00 2,750.00 6.81 1.00 Bolon 53+000
2/24/2022 4325 30300 23,570.00 2,750.00 8.57 1.00 Bolon 53+000
2/24/2022 4326 30299 18,790.00 2,750.00 6.83 1.00 Bolon 53+000
2/24/2022 4328 30294 18,290.00 2,750.00 6.65 1.00 Bolon 53+000
2/24/2022 4327 30273 16,480.00 2,750.00 5.99 1.00 Bolon 53+000
2/24/2022 4329 30303 16,440.00 2,750.00 5.98 1.00 Bolon 53+000
2/24/2022 4330 30275 19,650.00 2,750.00 7.15 1.00 Bolon 53+000
2/24/2022 4332 30273 18,780.00 2,750.00 6.83 1.00 Bolon 53+000
2/24/2022 4331 30300 15,780.00 2,750.00 5.74 1.00 Bolon 53+000
2/24/2022 4333 30299 18,170.00 2,750.00 6.61 1.00 Bolon 53+000
2/24/2022 4334 30294 21,980.00 2,750.00 7.99 1.00 Bolon 53+000
2/24/2022 4336 30300 20,870.00 2,750.00 7.59 1.00 Bolon 53+000
2/24/2022 4335 30275 21,540.00 2,750.00 7.83 1.00 Bolon 53+000
2/24/2022 4337 30303 18,500.00 2,750.00 6.73 1.00 Bolon 53+000
2/24/2022 4338 30273 20,630.00 2,750.00 7.50 1.00 Bolon 53+000
2/24/2022 4340 30300 18,210.00 2,750.00 6.62 1.00 Bolon 53+000
2/24/2022 4339 30299 19,610.00 2,750.00 7.13 1.00 Bolon 53+000
2/24/2022 4341 30296 18,510.00 2,750.00 6.73 1.00 Bolon 53+000
2/24/2022 4342 30275 22,210.00 2,750.00 8.08 1.00 Bolon 53+000
2/24/2022 4344 30300 18,210.00 2,750.00 6.62 1.00 Bolon 53+000
2/24/2022 4346 30299 13,170.00 2,750.00 4.79 1.00 Bolon 53+000
2/24/2022 4343 30273 17,160.00 2,750.00 6.24 1.00 Bolon 53+000
2/24/2022 4345 30303 20,350.00 2,750.00 7.40 1.00 Bolon 53+000
2/12/2022 3931 30300 16,070.00 2,750.00 5.84 1.00 Bolon 53+000
2/12/2022 3933 30275 15,930.00 2,750.00 5.79 1.00 Bolon 53+001
2/12/2022 3935 30273 10,460.00 2,750.00 3.80 1.00 Bolon 53+002
2/12/2022 3932 30303 17,490.00 2,750.00 6.36 1.00 Bolon 53+003
2/12/2022 3934 30300 17,860.00 2,750.00 6.49 1.00 Bolon 53+004
2/12/2022 3936 30299 24,890.00 2,750.00 9.05 1.00 Bolon 53+005
2/11/2022 3921 30365 24,280.00 2,750.00 8.83 1.00 Bolon 53+006
2/11/2022 3923 30273 19,580.00 2,750.00 7.12 1.00 Bolon 53+007
2/11/2022 3925 30275 21,210.00 2,750.00 7.71 1.00 Bolon 53+008
2/11/2022 3922 30299 15,260.00 2,750.00 5.55 1.00 Bolon 53+009
2/11/2022 3924 39294 21,550.00 2,750.00 7.84 1.00 Bolon 53+010
2/11/2022 3926 30303 17,440.00 2,750.00 6.34 1.00 Bolon 53+011
2/11/2022 3927 30365 20,800.00 2,750.00 7.56 1.00 Bolon 53+012
2/11/2022 3929 30294 530.00 2,750.00 0.19 1.00 Bolon 53+012
2/11/2022 3928 30299 19,060.00 2,750.00 6.93 1.00 Bolon 53+012
2/11/2022 3930 30294 22,140.00 2,750.00 8.05 1.00 Bolon 53+012
2/12/2022 3937 30294 20,370.00 2,750.00 7.41 1.00 Bolon 53+012
2/12/2022 3939 30273 16,570.00 2,750.00 6.03 1.00 Bolon 53+012
2/12/2022 3941 30133 7,650.00 2,750.00 2.78 1.00 Bolon 53+012
2/12/2022 3938 30303 16,240.00 2,750.00 5.91 1.00 Bolon 53+012
2/12/2022 3940 30133 11,060.00 2,750.00 4.02 1.00 Bolon 53+012
1/12/2022 3942 30299 18,600.00 2,750.00 6.76 1.00 Bolon 53+012
1/12/2022 3943 30294 18,460.00 2,750.00 6.71 1.00 Bolon 53+012
1/12/2022 3945 30273 26,040.00 2,750.00 9.47 1.00 Bolon 53+012
1/12/2022 3947 30300 21,950.00 2,750.00 7.98 1.00 Bolon 53+012
1/12/2022 3944 30303 18,828.00 2,750.00 6.85 1.00 Bolon 53+012
1/12/2022 3946 30300 9,170.00 2,750.00 3.33 1.00 Bolon 53+012
1/12/2022 3948 30299 19,320.00 2,750.00 7.03 1.00 Bolon 53+012
1/12/2022 3949 30300 25,340.00 2,750.00 9.21 1.00 Bolon 53+012
1/12/2022 3951 30299 22,340.00 2,750.00 8.12 1.00 Bolon 53+012
1/12/2022 3950 30365 28,170.00 2,750.00 10.24 1.00 Bolon 53+012
2/16/2022 4021 30294 19,050.00 2,750.00 6.93 1.00 Bolon 53+013
2/16/2022 4023 30275 14,090.00 2,750.00 5.12 1.00 Bolon 53+014
2/16/2022 4025 30299 15,780.00 2,750.00 5.74 1.00 Bolon 53+015
2/16/2022 4022 30303 14,100.00 2,750.00 5.13 1.00 Bolon 53+016
2/16/2022 4024 30365 14,930.00 2,750.00 5.43 1.00 Bolon 53+017
2/17/2022 4026 30365 18,530.00 2,750.00 6.74 1.00 Bolon 53+017
2/17/2022 4028 30299 13,900.00 2,750.00 5.05 1.00 Bolon 53+017
2/17/2022 4027 30294 17,578.00 2,750.00 6.39 1.00 Bolon 53+017
2/17/2022 4029 30303 15,970.00 2,750.00 5.81 1.00 Bolon 53+017
2/17/2022 4030 30275 15,770.00 2,750.00 5.73 1.00 Bolon 53+017
2/17/2022 4032 30300 17,380.00 2,750.00 6.32 1.00 Bolon 53+017
2/17/2022 4031 30133 10,730.00 2,750.00 3.90 1.00 Bolon 53+017
2/17/2022 4033 30365 16,810.00 2,750.00 6.11 1.00 Bolon 53+017
2/17/2022 4034 30299 16,080.00 2,750.00 5.85 1.00 Bolon 53+017
2/17/2022 4036 30364 19,460.00 2,750.00 7.08 1.00 Bolon 53+017
2/17/2022 4035 30294 15,330.00 2,750.00 5.57 1.00 Bolon 53+017
2/17/2022 4037 30303 20,290.00 2,750.00 7.38 1.00 Bolon 53+017
2/17/2022 4038 30275 17,620.00 2,750.00 6.41 1.00 Bolon 53+017
2/17/2022 4040 30300 18,860.00 2,750.00 6.86 1.00 Bolon 53+017
2/17/2022 4039 30133 10,390.00 2,750.00 3.78 1.00 Bolon 53+017
2/17/2022 4041 30299 17,330.00 2,750.00 6.30 1.00 Bolon 53+017
2/17/2022 4042 30365 15,350.00 2,750.00 5.58 1.00 Bolon 53+017
2/17/2022 4044 30303 15,880.00 2,750.00 5.77 1.00 Bolon 53+018
2/17/2022 4043 30294 9,290.00 2,750.00 3.38 1.00 Bolon 53+018
2/17/2022 4045 30275 15,190.00 2,750.00 5.52 1.00 Bolon 53+018
2/17/2022 4046 30300 12,030.00 2,750.00 4.37 1.00 Bolon 53+018
2/17/2022 4048 30364 19,440.00 2,750.00 7.07 1.00 Bolon 53+018
2/17/2022 4047 30299 15,270.00 2,750.00 5.55 1.00 Bolon 53+018
2/17/2022 4049 30294 16,870.00 2,750.00 6.13 1.00 Bolon 53+018
2/17/2022 4050 30303 13,530.00 2,750.00 4.92 1.00 Bolon 53+018
2/17/2022 4052 30300 14,850.00 2,750.00 5.40 1.00 Bolon 53+018
2/17/2022 4051 30133 12,740.00 2,750.00 4.63 1.00 Bolon 53+018
2/17/2022 4053 30275 17,420.00 2,750.00 6.33 1.00 Bolon 53+018
2/17/2022 4054 30365 20,390.00 2,750.00 7.41 1.00 Bolon 53+018
2/17/2022 4856 30133 11,840.00 2,750.00 4.31 1.00 Bolon 53+018
2/17/2022 4055 30299 15,800.00 2,750.00 5.75 1.00 Bolon 53+018
2/17/2022 4057 30294 17,640.00 2,750.00 6.41 1.00 Bolon 53+018
2/17/2022 4058 30303 16,490.00 2,750.00 6.00 1.00 Bolon 53+018
2/17/2022 4061 30364 21,570.00 2,750.00 7.84 1.00 Bolon 53+018
2/17/2022 4059 30300 17,950.00 2,750.00 6.53 1.00 Bolon 53+018
2/17/2022 4062 30365 15,530.00 2,750.00 5.65 1.00 Bolon 53+018
2/17/2022 4064 30294 14,930.00 2,750.00 5.43 1.00 Bolon 53+018
2/17/2022 4065 30303 15,620.00 2,750.00 5.68 1.00 Bolon 53+018
2/17/2022 4066 30275 16,510.00 2,750.00 6.00 1.00 Bolon 53+018
2/17/2022 4067 30299 15,970.00 2,750.00 5.81 1.00 Bolon 53+018
2/17/2022 4069 30365 15,900.00 2,750.00 5.78 1.00 Bolon 53+018
2/17/2022 4068 30294 17,580.00 2,750.00 6.39 1.00 Bolon 53+018
2/17/2022 4070 30303 15,030.00 2,750.00 5.47 1.00 Bolon 53+018
2/17/2022 4071 30275 16,360.00 2,750.00 5.95 1.00 Bolon 53+018
2/18/2022 4072 30299 16,890.00 2,750.00 6.14 1.00 Bolon 53+018
2/18/2022 4074 30274 18,070.00 2,750.00 6.57 1.00 Bolon 53+018
2/18/2022 4073 30303 15,380.00 2,750.00 5.59 1.00 Bolon 53+018
2/18/2022 4075 30275 16,480.00 2,750.00 5.99 1.00 Bolon 53+018
2/18/2022 4076 30365 16,650.00 2,750.00 6.05 1.00 Bolon 53+018
2/18/2022 4078 30299 15,100.00 2,750.00 5.49 1.00 Bolon 53+018
2/18/2022 4077 30300 16,960.00 2,750.00 6.17 1.00 Bolon 53+018
2/18/2022 4079 30274 16,300.00 2,750.00 5.93 1.00 Bolon 53+018
2/18/2022 4080 30303 15,270.00 2,750.00 5.55 1.00 Bolon 53+018
2/18/2022 4082 30300 18,150.00 2,750.00 6.60 1.00 Bolon 53+018
2/18/2022 4081 30365 17,350.00 2,750.00 6.31 1.00 Bolon 53+018
2/18/2022 4083 30275 15,110.00 2,750.00 5.49 1.00 Bolon 53+018
2/18/2022 4084 30294 16,690.00 2,750.00 6.07 1.00 Bolon 53+018
2/18/2022 4086 30303 16,620.00 2,750.00 6.04 1.00 Bolon 53+018
2/18/2022 4085 30133 11,340.00 2,750.00 4.12 1.00 Bolon 53+018
2/18/2022 4087 30300 17,450.00 2,750.00 6.35 1.00 Bolon 53+018
2/18/2022 4088 30365 14,140.00 2,750.00 5.14 1.00 Bolon 53+018
2/18/2022 4090 30300 16,090.00 2,750.00 5.85 1.00 Bolon 53+018
2/18/2022 4089 30303 15,790.00 2,750.00 5.74 1.00 Bolon 53+018
2/18/2022 4091 30365 15,950.00 2,750.00 5.80 1.00 Bolon 53+018
2/18/2022 4092 30299 16,990.00 2,750.00 6.18 1.00 Bolon 53+018
2/18/2022 4093 30133 10,110.00 2,750.00 3.68 1.00 Bolon 53+018
2/18/2022 4095 30300 17,210.00 2,750.00 6.26 1.00 Bolon 53+018
2/18/2022 4096 30365 19,040.00 2,750.00 6.92 1.00 Bolon 53+018
2/18/2022 4098 30294 20,120.00 2,750.00 7.32 1.00 Bolon 53+018
2/18/2022 4097 30275 16,640.00 2,750.00 6.05 1.00 Bolon 53+018
2/18/2022 4099 30299 18,510.00 2,750.00 6.73 1.00 Bolon 53+018
2/18/2022 4105 30365 17,110.00 2,750.00 6.22 1.00 Bolon 53+018
2/18/2022 4107 30294 15,980.00 2,750.00 5.81 1.00 Bolon 53+018
2/18/2022 4106 30303 17,450.00 2,750.00 6.35 1.00 Bolon 53+018
2/18/2022 4108 30270 15,940.00 2,750.00 5.80 1.00 Bolon 53+018
2/18/2022 4101 30303 15,950.00 2,750.00 5.80 1.00 Bolon 53+018
2/18/2022 4103 30294 17,490.00 2,750.00 6.36 1.00 Bolon 53+018
2/18/2022 4104 30299 14,920.00 2,750.00 5.43 1.00 Bolon 53+018
2/18/2022 4107 30299 17,700.00 2,750.00 6.44 1.00 Bolon 53+018
2/18/2022 4110 30365 14,440.00 2,750.00 5.25 1.00 Bolon 53+018
2/16/2022 4010 30303 14,690.00 2,750.00 5.34 1.00 Bolon 53+018
2/16/2022 4012 30275 17,710.00 2,750.00 6.44 1.00 Bolon 53+018
2/16/2022 4011 30300 14,460.00 2,750.00 5.26 1.00 Bolon 53+018
2/16/2022 4013 30365 10,060.00 2,750.00 3.66 1.00 Bolon 53+018
2/16/2022 4006 30275 16,370.00 2,750.00 5.95 1.00 Bolon 53+018
2/16/2022 4008 30133 2,010.00 2,750.00 0.73 1.00 Bolon 53+018
2/16/2022 4007 30300 16,280.00 2,750.00 5.92 1.00 Bolon 53+018
2/16/2022 4009 30274 440.00 2,750.00 0.16 1.00 Bolon 53+018
2/16/2022 4004 30303 16,370.00 2,750.00 5.95 1.00 Bolon 53+018
2/16/2022 3985 30274 920.00 2,750.00 0.33 1.00 Bolon 53+018
2/16/2022 3999 30300 15,720.00 2,750.00 5.72 1.00 Bolon 53+018
2/16/2022 4002 30133 12,280.00 2,750.00 4.47 1.00 Bolon 53+018
2/16/2022 4000 30365 1,040.00 2,750.00 0.38 1.00 Bolon 53+018
2/16/2022 4003 30299 17,290.00 2,750.00 6.29 1.00 Bolon 53+018
2/16/2022 3995 30364 16,230.00 2,750.00 5.90 1.00 Bolon 53+018
2/16/2022 3997 30303 14,730.00 2,750.00 5.36 1.00 Bolon 53+018
2/16/2022 3996 30294 17,490.00 2,750.00 6.36 1.00 Bolon 53+018
2/16/2022 3998 30299 16,530.00 2,750.00 6.01 1.00 Bolon 53+018
2/16/2022 3991 30300 16,280.00 2,750.00 5.92 1.00 Bolon 53+018
2/16/2022 3993 30299 17,540.00 2,750.00 6.38 1.00 Bolon 53+018
2/16/2022 3992 30133 11,613.00 2,750.00 4.22 1.00 Bolon 53+018
2/16/2022 3994 30275 18,140.00 2,750.00 6.60 1.00 Bolon 53+018
2/16/2022 3986 30299 17,118.00 2,750.00 6.22 1.00 Bolon 53+018
2/16/2022 3999 30275 19,950.00 2,750.00 7.25 1.00 Bolon 53+018
2/16/2022 3997 30362 18,970.00 2,750.00 6.90 1.00 Bolon 53+018
2/16/2022 3990 30365 20,810.00 2,750.00 7.57 1.00 Bolon 53+018
2/15/2022 3956 30365 19,670.00 2,750.00 7.15 1.00 Bolon 53+018
2/15/2022 3958 30133 11,570.00 2,750.00 4.21 1.00 Bolon 53+018
2/15/2022 3957 30275 18,550.00 2,750.00 6.75 1.00 Bolon 53+018
2/15/2022 3959 30300 19,760.00 2,750.00 7.19 1.00 Bolon 53+018
2/15/2022 3960 30294 20,370.00 2,750.00 7.41 1.00 Bolon 53+018
2/15/2022 3962 30303 15,770.00 2,750.00 5.73 1.00 Bolon 53+018
2/15/2022 3961 30299 18,180.00 2,750.00 6.61 1.00 Bolon 53+018
2/15/2022 3963 30299 18,180.00 2,750.00 6.61 1.00 Bolon 53+018
2/15/2022 3963 30365 22,990.00 2,750.00 8.36 1.00 Bolon 53+018
2/15/2022 3964 30300 18,610.00 2,750.00 6.77 1.00 Bolon 53+018
2/15/2022 3966 30299 17,890.00 2,750.00 6.51 1.00 Bolon 53+018
2/15/2022 3965 30273 26,580.00 2,750.00 9.67 1.00 Bolon 53+018
2/15/2022 3967 30294 15,660.00 2,750.00 5.69 1.00 Bolon 53+018
2/15/2022 3968 30303 17,430.00 2,750.00 6.34 1.00 Bolon 53+018
2/15/2022 3954 30299 16,170.00 2,750.00 5.88 1.00 Bolon 53+018
2/15/2022 3969 30299 20,300.00 2,750.00 7.38 1.00 Bolon 53+018
2/15/2022 3955 30303 23,530.00 2,750.00 8.56 1.00 Bolon 53+018
2/15/2022 3971 30275 19,480.00 2,750.00 7.08 1.00 Bolon 53+018
2/15/2022 3973 30275 11,810.00 2,750.00 4.29 1.00 Bolon 53+018
2/15/2022 3972 30300 23,180.00 2,750.00 8.43 1.00 Bolon 53+018
2/15/2022 3974 30274 16,860.00 2,750.00 6.13 1.00 Bolon 53+018
2/15/2022 3976 30365 2,100.00 2,750.00 0.76 1.00 Bolon 53+018
2/15/2022 3978 30274 15,200.00 2,750.00 5.53 1.00 Bolon 53+018
2/15/2022 3977 30303 16,150.00 2,750.00 5.87 1.00 Bolon 53+018
2/15/2022 3979 30133 11,760.00 2,750.00 4.28 1.00 Bolon 53+018
2/15/2022 3980 30275 16,040.00 2,750.00 5.83 1.00 Bolon 53+018
2/15/2022 3982 30297 23,570.00 2,750.00 8.57 1.00 Bolon 53+018
2/15/2022 3984 30365 16,520.00 2,750.00 6.01 1.00 Bolon 53+018
2/15/2022 3981 30303 16,370.00 2,750.00 5.95 1.00 Bolon 53+018
2/15/2022 3983 30364 19,970.00 2,750.00 7.26 1.00 Bolon 53+018
2/16/2022 4014 30303 17,690.00 2,750.00 6.43 1.00 Bolon 53+018
2/16/2022 4016 30300 16,210.00 2,750.00 5.89 1.00 Bolon 53+018
2/16/2022 4018 30294 15,020.00 2,750.00 5.46 1.00 Bolon 53+018
2/16/2022 4015 30275 13,530.00 2,750.00 4.92 1.00 Bolon 53+018
2/16/2022 4017 30133 10,640.00 2,750.00 3.87 1.00 Bolon 53+018
2/16/2022 4019 30299 19,410.00 2,750.00 7.06 1.00 Bolon 53+018
2/19/2022 4111 30303 16,820.00 2,750.00 6.12 1.00 Bolon 53+018
2/19/2022 4113 30294 17,490.00 2,750.00 6.36 1.00 Bolon 53+018
2/19/2022 4112 30275 17,420.00 2,750.00 6.33 1.00 Bolon 53+018
2/19/2022 4114 30273 18,150.00 2,750.00 6.60 1.00 Bolon 53+018
2/19/2022 4115 30299 17,780.00 2,750.00 6.47 1.00 Bolon 53+018
2/19/2022 4117 30300 14,550.00 2,750.00 5.29 1.00 Bolon 53+018
2/19/2022 4116 30365 20,990.00 2,750.00 7.63 1.00 Bolon 53+018
2/19/2022 4118 30365 15,650.00 2,750.00 5.69 1.00 Bolon 53+018
2/19/2022 4119 30303 16,100.00 2,750.00 5.85 1.00 Bolon 53+018
2/19/2022 4122 30275 21,010.00 2,750.00 7.64 1.00 Bolon 53+018
2/19/2022 4120 30275 16,610.00 2,750.00 6.04 1.00 Bolon 53+018
2/19/2022 4123 30303 15,640.00 2,750.00 5.69 1.00 Bolon 53+018
2/19/2022 4124 30294 18,830.00 2,750.00 6.85 1.00 Bolon 53+018
2/19/2022 4126 30365 15,460.00 2,750.00 5.62 1.00 Bolon 53+018
2/19/2022 4125 30299 14,710.00 2,750.00 5.35 1.00 Bolon 53+018
2/19/2022 4127 30273 16,250.00 2,750.00 5.91 1.00 Bolon 53+018
2/19/2022 4128 30274 18,680.00 2,750.00 6.79 1.00 Bolon 53+018
2/19/2022 4130 30303 15,370.00 2,750.00 5.59 1.00 Bolon 53+018
2/19/2022 4129 30275 18,050.00 2,750.00 6.56 1.00 Bolon 53+018
2/19/2022 4131 30299 17,720.00 2,750.00 6.44 1.00 Bolon 53+018
2/19/2022 4132 30273 15,900.00 2,750.00 5.78 1.00 Bolon 53+018
2/19/2022 4134 30133 11,140.00 2,750.00 4.05 1.00 Bolon 53+018
2/19/2022 4133 30294 17,320.00 2,750.00 6.30 1.00 Bolon 53+018
2/19/2022 4135 30275 15,110.00 2,750.00 5.49 1.00 Bolon 53+018
2/19/2022 4136 30365 17,640.00 2,750.00 6.41 1.00 Bolon 53+018
2/19/2022 4130 30294 20,440.00 2,750.00 7.43 1.00 Bolon 53+018
2/19/2022 4137 30273 16,360.00 2,750.00 5.95 1.00 Bolon 53+018
2/19/2022 4139 30294 18,240.00 2,750.00 6.63 1.00 Bolon 53+018
2/19/2022 4140 30273 20,250.00 2,750.00 7.36 1.00 Bolon 53+018
2/19/2022 4142 30273 18,260.00 2,750.00 6.64 1.00 Bolon 53+018
2/19/2022 4144 30294 15,330.00 2,750.00 5.57 1.00 Bolon 53+018
2/19/2022 4141 30275 17,540.00 2,750.00 6.38 1.00 Bolon 53+018
2/19/2022 4143 30275 15,510.00 2,750.00 5.64 1.00 Bolon 53+018
2/20/2022 4145 30303 18,420.00 2,750.00 6.70 1.00 Bolon 53+018
2/20/2022 4147 30299 19,060.00 2,750.00 6.93 1.00 Bolon 53+018
2/20/2022 4146 30294 21,350.00 2,750.00 7.76 1.00 Bolon 53+018
2/20/2022 4148 30273 19,360.00 2,750.00 7.04 1.00 Bolon 53+018
2/20/2022 4149 30365 15,470.00 2,750.00 5.63 1.00 Bolon 53+018
2/20/2022 4152 30274 22,220.00 2,750.00 8.08 1.00 Bolon 53+018
2/20/2022 4150 30275 20,370.00 2,750.00 7.41 1.00 Bolon 53+018
2/20/2022 4153 30299 22,040.00 2,750.00 8.01 1.00 Bolon 53+018
2/20/2022 4154 30273 19,480.00 2,750.00 7.08 1.00 Bolon 53+018
2/20/2022 4156 30365 19,810.00 2,750.00 7.20 1.00 Bolon 53+018
2/20/2022 4155 30275 19,220.00 2,750.00 6.99 1.00 Bolon 53+018
2/20/2022 4157 30133 16,820.00 2,750.00 6.12 1.00 Bolon 53+018
2/20/2022 4150 30299 24,550.00 2,750.00 8.93 1.00 Bolon 53+018
2/20/2022 4160 30184 12,920.00 2,750.00 4.70 1.00 Bolon 53+018
2/20/2022 4159 30133 12,410.00 2,750.00 4.51 1.00 Bolon 53+018
2/20/2022 4160 30184 12,920.00 2,750.00 4.70 1.00 Bolon 53+018
2/20/2022 4159 30133 12,410.00 2,750.00 4.51 1.00 Bolon 53+018
2/20/2022 4161 30365 22,880.00 2,750.00 8.32 1.00 Bolon 53+018
2/20/2022 4162 30273 22,960.00 2,750.00 8.35 1.00 Bolon 53+018
2/20/2022 4164 30299 23,540.00 2,750.00 8.56 1.00 Bolon 53+018
2/20/2022 4163 30275 24,050.00 2,750.00 8.75 1.00 Bolon 53+018
2/21/2022 4165 30299 17,660.00 2,750.00 6.42 1.00 Bolon 53+018
2/21/2022 4167 39273 14,300.00 2,750.00 5.20 1.00 Bolon 53+018
2/21/2022 4166 30303 17,590.00 2,750.00 6.40 1.00 Bolon 53+018
2/21/2022 4168 30294 18,000.00 2,750.00 6.55 1.00 Bolon 53+018
2/21/2022 4167 30275 15,540.00 2,750.00 5.65 1.00 Bolon 53+018
2/21/2022 4171 30300 15,030.00 2,750.00 5.47 1.00 Bolon 53+018
2/21/2022 4170 30133 14,020.00 2,750.00 5.10 1.00 Bolon 53+018
2/21/2022 4172 30184 9,860.00 2,750.00 3.59 1.00 Bolon 53+018
2/21/2022 4173 30365 19,400.00 2,750.00 7.05 1.00 Bolon 53+018
2/21/2022 4175 30303 16,600.00 2,750.00 6.04 1.00 Bolon 53+018
2/21/2022 4174 30299 19,920.00 2,750.00 7.24 1.00 Bolon 53+018
2/21/2022 4176 30274 20,160.00 2,750.00 7.33 1.00 Bolon 53+018
2/21/2022 4177 30273 19,650.00 2,750.00 7.15 1.00 Bolon 53+018
2/21/2022 4179 30133 12,430.00 2,750.00 4.52 1.00 Bolon 53+018
2/21/2022 4178 30275 16,740.00 2,750.00 6.09 1.00 Bolon 53+018
2/21/2022 4180 30300 17,950.00 2,750.00 6.53 1.00 Bolon 53+018
2/21/2022 4181 30184 10,320.00 2,750.00 3.75 1.00 Bolon 53+018
2/21/2022 4183 30365 18,830.00 2,750.00 6.85 1.00 Bolon 53+018
2/21/2022 4182 30299 18,350.00 2,750.00 6.67 1.00 Bolon 53+018
2/21/2022 4184 30303 21,120.00 2,750.00 7.68 1.00 Bolon 53+018
2/21/2022 4185 30294 19,410.00 2,750.00 7.06 1.00 Bolon 53+018
2/21/2022 4187 30275 21,610.00 2,750.00 7.86 1.00 Bolon 53+018
2/21/2022 4186 30273 21,200.00 2,750.00 7.71 1.00 Bolon 53+018
2/21/2022 4188 30133 12,370.00 2,750.00 4.50 1.00 Bolon 53+018
2/21/2022 4187 30296 19,210.00 2,750.00 6.99 1.00 Bolon 53+018
2/21/2022 4191 30184 13,420.00 2,750.00 4.88 1.00 Bolon 53+018
2/21/2022 4190 30300 15,750.00 2,750.00 5.73 1.00 Bolon 53+018
2/21/2022 4192 30365 18,230.00 2,750.00 6.63 1.00 Bolon 53+018
2/21/2022 4193 30273 16,760.00 2,750.00 6.09 1.00 Bolon 53+018
2/21/2022 4195 30275 19,890.00 2,750.00 7.23 1.00 Bolon 53+018
2/21/2022 4194 30300 20,110.00 2,750.00 7.31 1.00 Bolon 53+018
2/21/2022 4196 30303 20,320.00 2,750.00 7.39 1.00 Bolon 53+018
2/21/2022 4197 30133 11,140.00 2,750.00 4.05 1.00 Bolon 53+018
2/21/2022 4199 30184 13,480.00 2,750.00 4.90 1.00 Bolon 53+018
2/21/2022 4198 30296 18,440.00 2,750.00 6.71 1.00 Bolon 53+018
2/21/2022 4200 30300 19,130.00 2,750.00 6.96 1.00 Bolon 53+018
2/21/2022 4201 30365 20,420.00 2,750.00 7.43 1.00 Bolon 53+018
2/21/2022 4203 30299 22,830.00 2,750.00 8.30 1.00 Bolon 53+018
2/21/2022 4202 30294 19,350.00 2,750.00 7.04 1.00 Bolon 53+018
2/21/2022 4204 30273 21,520.00 2,750.00 7.83 1.00 Bolon 53+018
2/21/2022 4205 30275 20,340.00 2,750.00 7.40 1.00 Bolon 53+018
2/21/2022 4207 30133 13,190.00 2,750.00 4.80 1.00 Bolon 53+018
2/21/2022 4206 30296 19,740.00 2,750.00 7.18 1.00 Bolon 53+018
2/21/2022 4208 30184 12,980.00 2,750.00 4.72 1.00 Bolon 53+018
2/21/2022 4209 30365 20,050.00 2,750.00 7.29 1.00 Bolon 53+018
2/21/2022 4211 30299 16,860.00 2,750.00 6.13 1.00 Bolon 53+018
2/21/2022 4210 30300 17,380.00 2,750.00 6.32 1.00 Bolon 53+018
2/21/2022 4212 30294 20,720.00 2,750.00 7.53 1.00 Bolon 53+018
2/21/2022 4218 30184 11,450.00 2,750.00 4.16 1.00 Bolon 53+018
2/21/2022 4220 30299 22,280.00 2,750.00 8.10 1.00 Bolon 53+018
2/21/2022 4222 30275 14,770.00 2,750.00 5.37 1.00 Bolon 53+018
2/21/2022 4219 30299 19,860.00 2,750.00 7.22 1.00 Bolon 53+018
2/21/2022 4221 30365 21,480.00 2,750.00 7.81 1.00 Bolon 53+018
7,031,988.00 2,557.09 408.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3) Viajes Material Estac. Destino
4/4/2022 5760 30300 19,900.00 2,750.00 7.24 1.00 Bolon 52+070
4/4/2022 5761 30164 11,460.00 2,750.00 4.17 1.00 Bolon 52+070
4/4/2022 5762 30448 16,780.00 2,750.00 6.10 1.00 Bolon 52+300
4/4/2022 5763 30303 20,790.00 2,750.00 7.56 1.00 Bolon 52+300
4/4/2022 5764 30294 17,910.00 2,750.00 6.51 1.00 Bolon 52+300
4/4/2022 5765 30817 15,230.00 2,750.00 5.54 1.00 Bolon 52+300
4/4/2022 5766 30364 21,790.00 2,750.00 7.92 1.00 Bolon 52+300
4/4/2022 5767 30807 17,230.00 2,750.00 6.27 1.00 Bolon 52+300
4/4/2022 5768 30296 20,450.00 2,750.00 7.44 1.00 Bolon 52+300
4/4/2022 5769 30275 25,090.00 2,750.00 9.12 1.00 Bolon 52+300
4/4/2022 5770 30443 18,920.00 2,750.00 6.88 1.00 Bolon 52+300
4/4/2022 5771 30273 18,470.00 2,750.00 6.72 1.00 Bolon 52+300
4/4/2022 5772 30360 20,820.00 2,750.00 7.57 1.00 Bolon 52+300
4/4/2022 5773 30373 17,070.00 2,750.00 6.21 1.00 Bolon 52+300
4/4/2022 5774 3096 19,140.00 2,750.00 6.96 1.00 Bolon 52+300
4/4/2022 5775 30358 21,960.00 2,750.00 7.99 1.00 Bolon 52+300
4/4/2022 5776 30164 13,490.00 2,750.00 4.91 1.00 Bolon 52+300
4/4/2022 5777 30300 19,970.00 2,750.00 7.26 1.00 Bolon 52+300
4/4/2022 5778 30448 18,630.00 2,750.00 6.77 1.00 Bolon 52+300
4/4/2022 5779 30364 22,510.00 2,750.00 8.19 1.00 Bolon 52+300
4/4/2022 5780 30562 19,270.00 2,750.00 7.01 1.00 Bolon 52+300
4/4/2022 5781 30817 13,050.00 2,750.00 4.75 1.00 Bolon 52+300
4/4/2022 5782 30807 14,220.00 2,750.00 5.17 1.00 Bolon 52+300
4/4/2022 5783 30438 14,150.00 2,750.00 5.15 1.00 Bolon 52+300
4/4/2022 5784 30275 16,890.00 2,750.00 6.14 1.00 Bolon 52+300
4/4/2022 5785 30445 17,230.00 2,750.00 6.27 1.00 Bolon 52+300
4/4/2022 5786 30303 16,430.00 2,750.00 5.97 1.00 Bolon 52+300
4/4/2022 5787 30294 18,540.00 2,750.00 6.74 1.00 Bolon 52+300
4/4/2022 5788 30164 15,000.00 2,750.00 5.45 1.00 Bolon 52+300
4/4/2022 5789 30360 21,660.00 2,750.00 7.88 1.00 Bolon 52+300
4/4/2022 5790 30443 17,850.00 2,750.00 6.49 1.00 Bolon 53+000
4/4/2022 5791 30373 14,760.00 2,750.00 5.37 1.00 Bolon 53+000
4/4/2022 5792 30448 14,210.00 2,750.00 5.17 1.00 Bolon 53+000
4/4/2022 5793 30273 18,170.00 2,750.00 6.61 1.00 Bolon 53+000
4/4/2022 5794 30358 18,690.00 2,750.00 6.80 1.00 Bolon 53+000
4/4/2022 5795 30364 20,890.00 2,750.00 7.60 1.00 Bolon 53+000
4/4/2022 5796 30807 17,880.00 2,750.00 6.50 1.00 Bolon 53+000
4/4/2022 5797 30300 16,750.00 2,750.00 6.09 1.00 Bolon 53+000
4/4/2022 5798 30275 20,650.00 2,750.00 7.51 1.00 Bolon 53+000
4/4/2022 5799 30296 17,710.00 2,750.00 6.44 1.00 Bolon 53+000
4/4/2022 5800 30438 15,540.00 2,750.00 5.65 1.00 Bolon 53+000
4/4/2022 5801 30164 13,350.00 2,750.00 4.85 1.00 Bolon 53+000
4/4/2022 5802 30562 16,220.00 2,750.00 5.90 1.00 Bolon 53+000
4/4/2022 5804 30294 25,840.00 2,750.00 9.40 1.00 Bolon 53+000
4/4/2022 5805 30373 16,890.00 2,750.00 6.14 1.00 Bolon 53+000
4/4/2022 5806 30448 16,090.00 2,750.00 5.85 1.00 Bolon 53+000
4/4/2022 5807 30443 17,860.00 2,750.00 6.49 1.00 Bolon 53+000
4/4/2022 5808 30364 18,100.00 2,750.00 6.58 1.00 Bolon 53+000
4/4/2022 5809 30303 21,590.00 2,750.00 7.85 1.00 Bolon 53+000
4/4/2022 5810 30358 20,090.00 2,750.00 7.31 1.00 Bolon 53+000
4/4/2022 5811 30807 15,890.00 2,750.00 5.78 1.00 Bolon 53+000
4/4/2022 5812 30273 21,320.00 2,750.00 7.75 1.00 Bolon 53+000
4/4/2022 5813 30300 19,160.00 2,750.00 6.97 1.00 Bolon 53+000
4/4/2022 5814 30448 13,920.00 2,750.00 5.06 1.00 Bolon 53+000
4/4/2022 5815 18390 18,390.00 2,750.00 6.69 1.00 Bolon 53+000
4/4/2022 5816 30373 15,050.00 2,750.00 5.47 1.00 Bolon 53+000
4/4/2022 5817 30364 16,150.00 2,750.00 5.87 1.00 Bolon 53+000
4/4/2022 5818 30443 17,950.00 2,750.00 6.53 1.00 Bolon 53+000
4/4/2022 5819 30360 19,080.00 2,750.00 6.94 1.00 Bolon 53+000
4/4/2022 5820 30296 16,770.00 2,750.00 6.10 1.00 Bolon 53+000
4/4/2022 5821 30438 10,010.00 2,750.00 3.64 1.00 Bolon 53+000
4/4/2022 5822 30807 16,690.00 2,750.00 6.07 1.00 Bolon 53+000
4/4/2022 5823 30538 20,200.00 2,750.00 7.35 1.00 Bolon 53+000
4/4/2022 5824 30164 12,940.00 2,750.00 4.71 1.00 Bolon 53+000
4/4/2022 5825 30303 16,700.00 2,750.00 6.07 1.00 Bolon 53+000
4/4/2022 5826 30562 17,140.00 2,750.00 6.23 1.00 Bolon 53+000
4/4/2022 5827 30275 24,050.00 2,750.00 8.75 1.00 Bolon 53+000
4/4/2022 5828 30173 16,200.00 2,750.00 5.89 1.00 Bolon 53+000
4/4/2022 5829 30273 19,680.00 2,750.00 7.16 1.00 Bolon 53+000
4/4/2022 5830 30373 16,780.00 2,750.00 6.10 1.00 Bolon 53+000
4/4/2022 5831 30364 22,450.00 2,750.00 8.16 1.00 Bolon 53+000
4/4/2022 5832 27910 16,420.00 2,750.00 5.97 1.00 Bolon 53+000
4/4/2022 5833 30360 20,080.00 2,750.00 7.30 1.00 Bolon 53+000
4/4/2022 5834 30300 17,960.00 2,750.00 6.53 1.00 Bolon 53+000
4/4/2022 5835 30448 16,240.00 2,750.00 5.91 1.00 Bolon 53+000
4/4/2022 5836 30443 16,830.00 2,750.00 6.12 1.00 Bolon 53+000
4/4/2022 5837 30807 14,490.00 2,750.00 5.27 1.00 Bolon 53+000
4/4/2022 5838 30274 21,150.00 2,750.00 7.69 1.00 Bolon 53+000
4/4/2022 5839 30817 13,000.00 2,750.00 4.73 1.00 Bolon 53+000
4/4/2022 5840 30358 19,980.00 2,750.00 7.27 1.00 Bolon 53+000
4/4/2022 5841 30275 20,060.00 2,750.00 7.29 1.00 Bolon 53+000
4/4/2022 5842 30296 21,040.00 2,750.00 7.65 1.00 Bolon 53+000
4/4/2022 5843 30173 17,980.00 2,750.00 6.54 1.00 Bolon 53+000
4/4/2022 5844 30294 21,250.00 2,750.00 7.73 1.00 Bolon 53+000
4/4/2022 5845 30303 17,740.00 2,750.00 6.45 1.00 Bolon 53+000
4/4/2022 5846 30373 10,260.00 2,750.00 3.73 1.00 Bolon 53+000
4/4/2022 5847 30273 17,820.00 2,750.00 6.48 1.00 Bolon 53+000
4/4/2022 5848 30364 18,980.00 2,750.00 6.90 1.00 Bolon 53+000
4/4/2022 5849 30430 14,890.00 2,750.00 5.41 1.00 Bolon 53+000
4/4/2022 5850 30562 17,320.00 2,750.00 6.30 1.00 Bolon 53+000
4/4/2022 5851 30443 18,880.00 2,750.00 6.87 1.00 Bolon 53+000
4/4/2022 5852 30807 15,610.00 2,750.00 5.68 1.00 Bolon 53+000
4/4/2022 5853 30184 12,350.00 2,750.00 4.49 1.00 Bolon 53+000
4/4/2022 5854 30274 24,150.00 2,750.00 8.78 1.00 Bolon 53+000
4/4/2022 5855 30300 19,560.00 2,750.00 7.11 1.00 Bolon 53+000
4/4/2022 5856 30275 20,490.00 2,750.00 7.45 1.00 Bolon 53+000
4/4/2022 5857 30360 19,710.00 2,750.00 7.17 1.00 Bolon 53+000
4/4/2022 5858 30296 22,470.00 2,750.00 8.17 1.00 Bolon 53+000
4/4/2022 5859 30358 19,350.00 2,750.00 7.04 1.00 Bolon 53+000
4/4/2022 5860 30184 13,050.00 2,750.00 4.75 1.00 Bolon 53+000
4/4/2022 5861 30364 19,730.00 2,750.00 7.17 1.00 Bolon 53+000
4/4/2022 5862 30807 14,070.00 2,750.00 5.12 1.00 Bolon 53+000
4/4/2022 5863 30562 13,910.00 2,750.00 5.06 1.00 Bolon 53+000
4/4/2022 5864 30438 11,640.00 2,750.00 4.23 1.00 Bolon 53+000
4/4/2022 5866 30274 21,610.00 2,750.00 7.86 1.00 Bolon 53+000
4/4/2022 5867 30275 19,900.00 2,750.00 7.24 1.00 Bolon 53+000
4/4/2022 5868 30296 17,590.00 2,750.00 6.40 1.00 Bolon 53+000
4/4/2022 5869 30300 21,870.00 2,750.00 7.95 1.00 Bolon 53+000
4/4/2022 5870 30443 17,450.00 2,750.00 6.35 1.00 Bolon 53+000
4/4/2022 5871 30358 20,970.00 2,750.00 7.63 1.00 Bolon 53+000
4/4/2022 5872 30360 19,900.00 2,750.00 7.24 1.00 Bolon 53+000
4/4/2022 5873 30817 16,050.00 2,750.00 5.84 1.00 Bolon 53+000
4/4/2022 5874 30294 18,320.00 2,750.00 6.66 1.00 Bolon 53+000
4/4/2022 5875 30173 14,970.00 2,750.00 5.44 1.00 Bolon 53+000
6.50
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
4/5/2022 5876 30364 19610 2,750.00 7.13
4/5/2022 5877 30273 18870 2,750.00 6.86
4/5/2022 5878 30274 17490 2,750.00 6.36
4/5/2022 5880 30294 18200 2,750.00 6.62
4/5/2022 5881 30360 19850 2,750.00 7.22
4/5/2022 5882 30296 22550 2,750.00 8.20
4/5/2022 5883 30807 18820 2,750.00 6.84
4/5/2022 5885 30364 22250 2,750.00 8.09
4/5/2022 5886 30562 16740 2,750.00 6.08
4/5/2022 5887 30360 20620 2,750.00 7.50
4/5/2022 5888 30807 17640 2,750.00 6.41
4/5/2022 5889 30294 22460 2,750.00 8.17
4/5/2022 5890 30275 22260 2,750.00 8.09
4/5/2022 5891 30364 22980 2,750.00 8.36
4/5/2022 5892 30296 21270 2,750.00 7.73
4/5/2022 5893 30360 17970 2,750.00 10.27
4/5/2022 5894 30807 15900 2,750.00 5.78
4/5/2022 5895 30364 21800 2,750.00 7.93
4/5/2022 5897 30562 17910 2,750.00 6.51
4/5/2022 5898 30296 19900 2,750.00 7.24
4/5/2022 5899 30294 19610 2,750.00 7.13
4/5/2022 5900 30358 21960 2,750.00 7.99
4/5/2022 5901 30275 19680 2,750.00 7.16
4/5/2022 5902 30274 22010 2,750.00 8.00
4/5/2022 5903 30364 23380 2,750.00 8.50
4/5/2022 5904 30807 16980 2,750.00 6.17
4/5/2022 5905 30817 16420 2,750.00 5.97
4/5/2022 5906 30360 20820 2,750.00 7.57
4/5/2022 5907 30358 21350 2,750.00 7.76
4/5/2022 5908 30562 17970 2,750.00 6.53
4/5/2022 5909 30274 20490 2,750.00 7.45
4/5/2022 5910 30364 23790 2,750.00 8.65
4/5/2022 5911 30807 19420 2,750.00 7.06
4/5/2022 5912 30296 21130 2,750.00 7.68
4/5/2022 5913 30294 18750 2,750.00 6.82
4/5/2022 5914 30275 23070 2,750.00 8.39
4/5/2022 5915 30443 20510 2,750.00 7.46
4/5/2022 5916 30273 19610 2,750.00 7.13
4/5/2022 5917 30817 14350 2,750.00 5.22
4/5/2022 5918 30358 20900 2,750.00 7.60
4/5/2022 5919 30364 20630 2,750.00 7.50
4/5/2022 5920 30274 23470 2,750.00 8.53
4/5/2022 5921 30807 19190 2,750.00 6.98
4/5/2022 5922 30443 19860 2,750.00 7.22
4/5/2022 5923 30562 19300 2,750.00 7.02
4/5/2022 5924 30296 19790 2,750.00 7.19
4/5/2022 5925 30817 15490 2,750.00 5.63
4/5/2022 5926 30438 15990 2,750.00 5.81
4/5/2022 5927 30294 22550 2,750.00 8.20
4/5/2022 5928 30275 19570 2,750.00 7.12
4/5/2022 5929 30364 25710 2,750.00 9.35
4/5/2022 5930 30358 25130 2,750.00 9.14
4/5/2022 5931 30274 26570 2,750.00 9.66
4/5/2022 5932 30807 2,750.00 6.20
4/5/2022 5933 30273 21720 2,750.00 7.90
4/5/2022 5934 30443 19960 2,750.00 7.26
4/5/2022 5935 30164 15620 2,750.00 5.68
4/5/2022 5936 30358 25960 2,750.00 9.44
4/5/2022 5937 30807 19180 2,750.00 6.97
4/5/2022 5938 30817 14340 2,750.00 5.21
4/5/2022 5939 30438 15720 2,750.00 5.72
4/5/2022 5940 30364 23870 2,750.00 8.68
4/5/2022 5941 30296 19120 2,750.00 6.95
4/5/2022 5942 30274 22510 2,750.00 8.19
4/5/2022 5943 30562 16390 2,750.00 5.96
4/5/2022 5944 30275 20690 2,750.00 7.52
7.34
a – Puerto Cabezas (85.65km)”

plén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 52+070
1.00 Bolon 52+070
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.6
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
4/6/2022 5958 30358 2,750.00 8.60
4/6/2022 5981 30358 2,750.00 8.29
4/6/2022 6017 30358 20710 2,750.00 7.53
4/6/2022 6028 30358 22530 2,750.00 8.19
Total 8.15
a – Puerto Cabezas (85.65km)”

én t=0.90

Viajes Material Estac. Destino

1.00 Bolon 52+300


1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (8
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
4/7/2022 6053 30358 24,150.00 2,750.00 8.78
4/7/2022 6072 30358 21,400.00 2,750.00 7.78
4/7/2022 6093 30358 25,060.00 2,750.00 9.11
4/7/2022 6113 30358 10,200.00 2,750.00 3.71
4/7/2022 6147 30358 22,520.00 2,750.00 8.19
7.51
hsa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 52+300
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
1.00 Bolon 53+000
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
4/8/2022 6162 30364 21,080.00 2,750.00 7.67
4/8/2022 6163 3096 14,250.00 2,750.00 5.18
4/8/2022 6164 30303 21,630.00 2,750.00 7.87
4/8/2022 6165 30365 17,500.00 2,750.00 6.36
4/8/2022 6166 30300 22,740.00 2,750.00 8.27
4/8/2022 6167 30817 16,880.00 2,750.00 6.14
4/8/2022 6168 30296 19,790.00 2,750.00 7.20
4/8/2022 6169 30443 21,100.00 2,750.00 7.67
4/8/2022 6170 30184 15,450.00 2,750.00 5.62
4/8/2022 6171 30358 23,640.00 2,750.00 8.60
4/8/2022 6172 30173 18,510.00 2,750.00 6.73
4/8/2022 6173 30274 20,740.00 2,750.00 7.54
4/8/2022 6174 30294 18,230.00 2,750.00 6.63
4/8/2022 6175 30243 20,570.00 2,750.00 7.48
4/8/2022 6176 30275 20,900.00 2,750.00 7.60
4/8/2022 6177 30562 16,460.00 2,750.00 5.99
4/8/2022 6178 30273 19,180.00 2,750.00 6.97
4/8/2022 6179 30365 16,840.00 2,750.00 6.12
4/8/2022 6180 30294 19,490.00 2,750.00 7.09
4/8/2022 6181 30243 21,050.00 2,750.00 7.65
4/8/2022 6182 30562 18,090.00 2,750.00 6.58
7.00
ahsa – Puerto Cabezas (85.65km)”

draplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 52+070


1.00 Bolon 52+070
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
1.00 Bolon 52+300
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg)
(kg/m3)
4/9/2022 6183.00 30817 18400.00 2,750.00
4/9/2022 6184.00 30364 19590.00 2,750.00
4/9/2022 6185.00 30365 24310.00 2,750.00
4/9/2022 6186.00 30300 23510.00 2,750.00
4/9/2022 6187.00 30273 20740.00 2,750.00
4/9/2022 6188.00 30274 21270.00 2,750.00
4/9/2022 6189.00 30358 24810.00 2,750.00
4/9/2022 6190.00 30173 17960.00 2,750.00
4/9/2022 6191.00 3096 20250.00 2,750.00
4/9/2022 6192.00 30296 20400.00 2,750.00
4/9/2022 6193.00 30438 16230.00 2,750.00
4/9/2022 6194.00 30275 19310.00 2,750.00
4/9/2022 6195.00 30297 20590.00 2,750.00
4/9/2022 6196.00 30817 16330.00 2,750.00
4/9/2022 6197.00 30364 23390.00 2,750.00
4/9/2022 6198.00 30243 20310.00 2,750.00
4/9/2022 6199.00 30303 19190.00 2,750.00
4/9/2022 6200.00 30373 19860.00 2,750.00
4/9/2022 6201.00 30274 21910.00 2,750.00
4/9/2022 6202.00 30365 21280.00 2,750.00
4/9/2022 6203.00 30300 20540.00 2,750.00
4/9/2022 6204.00 30562 17070.00 2,750.00
4/9/2022 6205.00 30273 21330.00 2,750.00
4/9/2022 6206.00 30173 17490.00 2,750.00
4/9/2022 6207 30358 21,940.00 2,750.00
4/9/2022 6208 3096 16,720.00 2,750.00
4/9/2022 6209 30297 22,640.00 2,750.00
4/9/2022 6210 30364 23,490.00 2,750.00
4/9/2022 6211 30438 15,850.00 2,750.00
4/9/2022 6212 30373 17,300.00 2,750.00
4/9/2022 6213 30817 16,990.00 2,750.00
4/9/2022 6214 30275 21,780.00 2,750.00
4/9/2022 6215 30303 19,240.00 2,750.00
4/9/2022 6216 30445 23,640.00 2,750.00
4/9/2022 6217 30274 22,190.00 2,750.00
4/9/2022 6218 30296 19,990.00 2,750.00
4/9/2022 6219 30164 14,240.00 2,750.00
4/9/2022 6220 30300 20,150.00 2,750.00
4/9/2022 6221 30365 19,940.00 2,750.00
4/9/2022 6222 30296 13,810.00 2,750.00
4/9/2022 6223 30297 24,610.00 2,750.00
4/9/2022 6224 30358 22,250.00 2,750.00
4/9/2022 6225 30173 18,770.00 2,750.00
4/9/2022 6226 3096 18,160.00 2,750.00
4/9/2022 6227 30817 16,990.00 2,750.00
4/9/2022 6228 30364 24,600.00 2,750.00
4/9/2022 6229 30273 23,990.00 2,750.00
4/9/2022 6230 30373 19,490.00 2,750.00
4/9/2022 6231 30275 21,820.00 2,750.00
4/9/2022 6232 30303 20,490.00 2,750.00
4/9/2022 6233 30438 17,190.00 2,750.00
4/9/2022 6234 30274 22,080.00 2,750.00
4/9/2022 6235 30364 21,850.00 2,750.00
4/9/2022 6236 30817 13,740.00 2,750.00
4/9/2022 6237 30562 17,660.00 2,750.00
4/9/2022 6238 30300 20,450.00 2,750.00
4/9/2022 6239 30296 15,580.00 2,750.00
4/9/2022 6240 30297 20,030.00 2,750.00
4/9/2022 6241 30164 13,540.00 2,750.00
4/9/2022 6242 30358 20,670.00 2,750.00
4/9/2022 6243 30303 22,710.00 2,750.00
4/9/2022 6244 3096 16,300.00 2,750.00
4/9/2022 6245 30365 20,900.00 2,750.00
4/9/2022 6246 30273 18,830.00 2,750.00
4/9/2022 6247 30364 22,980.00 2,750.00
4/9/2022 6248 30274 21,420.00 2,750.00
4/9/2022 6249 30275 17,970.00 2,750.00
4/9/2022 6250 30297 23,420.00 2,750.00
4/9/2022 6251 30164 15,360.00 2,750.00
4/9/2022 6252 30358 23,830.00 2,750.00
4/9/2022 6253 30300 20,990.00 2,750.00
4/9/2022 6254 30296 19,450.00 2,750.00
4/9/2022 6255 30562 16,940.00 2,750.00
4/9/2022 6256 30173 16,820.00 2,750.00
4/9/2022 6257 3096 17,610.00 2,750.00
4/9/2022 6258 30274 22,650.00 2,750.00
4/9/2022 6259 30807 19,680.00 2,750.00
4/9/2022 6260 30438 1,880.00 2,750.00
4/9/2022 6261 30365 28,330.00 2,750.00
4/9/2022 6262 30364 21,870.00 2,750.00
4/9/2022 6263 30273 18,930.00 2,750.00
4/9/2022 6264 30113 15,270.00 2,750.00
4/9/2022 6265 30297 21,750.00 2,750.00
4/9/2022 6266 30817 17,710.00 2,750.00
4/9/2022 6267 30303 16,910.00 2,750.00
4/9/2022 6268 30275 22,620.00 2,750.00
4/9/2022 6269 30164 14,770.00 2,750.00
4/9/2022 6270 30335 14,430.00 2,750.00
4/9/2022 6271 30358 21,860.00 2,750.00
4/9/2022 6272 30173 15,570.00 2,750.00
4/9/2022 6273 30807 17,020.00 2,750.00
4/9/2022 6274 30300 20,400.00 2,750.00
4/9/2022 6275 30562 21,120.00 2,750.00
4/9/2022 6276 30274 20,320.00 2,750.00
4/9/2022 6277 30297 18,840.00 2,750.00
4/9/2022 6278 30113 13,720.00 2,750.00
4/9/2022 6279 30164 13,280.00 2,750.00
4/9/2022 6280 3096 15,780.00 2,750.00
4/9/2022 6281 30373 16,890.00 2,750.00
4/9/2022 6282 30364 21,260.00 2,750.00
4/9/2022 6283 30365 19,890.00 2,750.00
4/9/2022 6284 30273 19,790.00 2,750.00
4/9/2022 6285 30275 18,590.00 2,750.00
4/9/2022 6286 30303 18,000.00 2,750.00
4/9/2022 6287 30296 22,390.00 2,750.00
4/9/2022 6288 30817 15,720.00 2,750.00
nto de la Carretera Sahsa – Puerto Cabezas (85.65km)”
mo II : 32.5 Km

CULA : 203(10B) Pedraplén t=0.90

Volumen (m3) Viajes Material Estac. Destino

6.69 1.00 bolon 52+300


7.12 1.00 bolon 52+300
8.84 1.00 bolon 52+300
8.55 1.00 bolon 52+300
7.54 1.00 bolon 52+300
7.73 1.00 bolon 52+300
9.02 1.00 bolon 52+300
6.53 1.00 bolon 52+300
7.36 1.00 bolon 52+300
7.42 1.00 bolon 52+300
5.90 1.00 bolon 52+300
7.02 1.00 bolon 53+300
7.49 1.00 bolon 53+300
5.94 1.00 bolon 53+300
8.51 1.00 bolon 53+300
7.39 1.00 bolon 53+300
6.98 1.00 bolon 53+300
7.22 1.00 bolon 53+300
7.97 1.00 bolon 53+300
7.74 1.00 bolon 53+300
7.47 1.00 bolon 53+300
6.21 1.00 bolon 53+300
7.76 1.00 bolon 53+300
6.36 1.00 bolon 53+300
7.98 1.00 Bolon 53+300
6.08 1.00 Bolon 53+300
8.23 1.00 Bolon 53+300
8.54 1.00 Bolon 53+300
5.76 1.00 Bolon 53+300
6.29 1.00 Bolon 53+300
6.18 1.00 Bolon 53+300
7.92 1.00 Bolon 53+300
7.00 1.00 Bolon 53+300
8.60 1.00 Bolon 53+300
8.07 1.00 Bolon 53+300
7.27 1.00 Bolon 53+300
5.18 1.00 Bolon 53+300
7.33 1.00 Bolon 53+300
7.25 1.00 Bolon 53+300
5.02 1.00 Bolon 53+300
8.95 1.00 Bolon 53+300
8.09 1.00 Bolon 53+300
6.83 1.00 Bolon 53+300
6.60 1.00 Bolon 53+300
6.18 1.00 Bolon 53+300
8.95 1.00 Bolon 53+900
8.72 1.00 Bolon 53+900
7.09 1.00 Bolon 53+900
7.93 1.00 Bolon 53+900
7.45 1.00 Bolon 53+900
6.25 1.00 Bolon 53+900
8.03 1.00 Bolon 53+900
7.95 1.00 Bolon 53+900
5.00 1.00 Bolon 53+900
6.42 1.00 Bolon 53+900
7.44 1.00 Bolon 53+900
5.67 1.00 Bolon 53+900
7.28 1.00 Bolon 53+900
4.92 1.00 Bolon 53+900
7.52 1.00 Bolon 53+900
8.26 1.00 Bolon 53+900
5.93 1.00 Bolon 53+900
7.60 1.00 Bolon 53+900
6.85 1.00 Bolon 53+900
8.36 1.00 Bolon 53+900
7.79 1.00 Bolon 53+900
6.53 1.00 Bolon 53+900
8.52 1.00 Bolon 53+900
5.59 1.00 Bolon 53+900
8.67 1.00 Bolon 53+900
7.63 1.00 Bolon 53+900
7.07 1.00 Bolon 53+900
6.16 1.00 Bolon 53+900
6.12 1.00 Bolon 53+900
6.40 1.00 Bolon 53+900
8.24 1.00 Bolon 53+900
7.16 1.00 Bolon 53+900
0.68 1.00 Bolon 53+900
10.30 1.00 Bolon 53+900
7.95 1.00 Bolon 53+900
6.88 1.00 Bolon 53+900
5.55 1.00 Bolon 53+900
7.91 1.00 Bolon 53+900
6.44 1.00 Bolon 53+900
6.15 1.00 Bolon 53+900
8.23 1.00 Bolon 53+900
5.37 1.00 Bolon 53+900
5.25 1.00 Bolon 53+900
7.95 1.00 Bolon 53+900
5.66 1.00 Bolon 53+300
6.19 1.00 Bolon 53+300
7.42 1.00 Bolon 53+300
7.68 1.00 Bolon 53+300
7.39 1.00 Bolon 53+300
6.85 1.00 Bolon 52+400
4.99 1.00 Bolon 52+400
4.83 1.00 Bolon 52+400
5.74 1.00 Bolon 52+400
6.14 1.00 Bolon 52+400
7.73 1.00 Bolon 52+400
7.23 1.00 Bolon 52+400
7.20 1.00 Bolon 52+400
6.76 1.00 Bolon 52+400
6.55 1.00 Bolon 52+400
8.14 1.00 Bolon 52+400
5.72 1.00 Bolon 52+400
7.04
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
4/10/2022 6296 30297 21,080.00 2,750.00 7.67
4/10/2022 6312 30297 20,800.00 2,750.00 7.56
4/10/2022 6329 30297 24,580.00 2,750.00 8.94
4/10/2022 6351 30297 24,310.00 2,750.00 8.84
4/10/2022 6367 30297 18,390.00 2,750.00 6.69
7.94
ahsa – Puerto Cabezas (85.65km)”

draplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+300


1.00 Bolon 52+400
1.00 Bolon 53+900
1.00 Bolon 52+400
1.00 Bolon 53+900
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
4/11/2022 6373 30365 16,530.00 2,750.00 6.01
4/11/2022 6391 30365 18,630.00 2,750.00 6.77
4/11/2022 6421 30365 21,780.00 2,750.00 7.92
4/11/2022 6441 30365 19,890.00 2,750.00 7.23
4/11/2022 6459 30365 16,510.00 2,750.00 6.00
6.79
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 53+900
1.00 Bolon 53+900
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
4/19/2022 6464 30358 24,800.00 2,750.00 9.02
4/19/2022 6465 30364 21,850.00 2,750.00 7.95
4/19/2022 6466 30807 16,040.00 2,750.00 5.83
4/19/2022 6467 30445 16,740.00 2,750.00 6.09
4/19/2022 6468 30817 18,900.00 2,750.00 6.87
4/19/2022 6469 30443 20,630.00 2,750.00 7.50
4/19/2022 6470 30303 21,480.00 2,750.00 7.81
4/19/2022 6471 30300 21,190.00 2,750.00 7.71
4/19/2022 6472 30365 19,370.00 2,750.00 7.04
4/19/2022 6473 30173 17,580.00 2,750.00 6.39
4/19/2022 6474 30438 15,750.00 2,750.00 5.73
4/19/2022 6475 30386 17,180.00 2,750.00 6.25
4/19/2022 6476 30164 15,410.00 2,750.00 5.60
4/19/2022 6477 30296 20,680.00 2,750.00 7.52
4/19/2022 6478 30275 20,790.00 2,750.00 7.56
4/19/2022 6479 30184 14,600.00 2,750.00 5.31
4/19/2022 6480 30364 23,580.00 2,750.00 8.57
4/19/2022 6481 30562 17,970.00 2,750.00 6.53
4/19/2022 6482 30358 25,070.00 2,750.00 9.12
4/19/2022 6483 30445 19,040.00 2,750.00 6.92
4/19/2022 6484 30817 17,620.00 2,750.00 6.41
4/19/2022 6485 30443 22,450.00 2,750.00 8.16
4/19/2022 6486 30274 23,510.00 2,750.00 8.55
4/19/2022 6487 30807 21,980.00 2,750.00 7.99
4/19/2022 6488 30303 21,820.00 2,750.00 7.93
4/19/2022 6489 30386 16,890.00 2,750.00 6.14
4/19/2022 6490 30300 20,740.00 2,750.00 7.54
4/19/2022 6491 30365 18,910.00 2,750.00 6.88
4/19/2022 6492 30173 17,360.00 2,750.00 6.31
4/19/2022 6493 30164 13,080.00 2,750.00 4.76
4/19/2022 6494 30438 13,700.00 2,750.00 4.98
4/19/2022 6495 30184 11,140.00 2,750.00 4.05
4/19/2022 6496 30364 23,950.00 2,750.00 8.71
4/19/2022 6497 30296 24,030.00 2,750.00 8.74
4/19/2022 6498 30358 21,650.00 2,750.00 7.87
4/19/2022 6499 30817 19,370.00 2,750.00 7.04
4/19/2022 6500 30807 19,920.00 2,750.00 7.24
4/19/2022 6501 30275 19,240.00 2,750.00 7.00
4/19/2022 6502 30273 21,760.00 2,750.00 7.91
4/19/2022 6503 30274 21,210.00 2,750.00 7.71
4/19/2022 6504 30443 21,010.00 2,750.00 7.64
4/19/2022 6505 30445 16,120.00 2,750.00 5.86
4/19/2022 6506 30164 14,650.00 2,750.00 5.33
4/19/2022 6507 30562 19,570.00 2,750.00 7.12
4/19/2022 6508 30173 17,420.00 2,750.00 6.33
4/19/2022 6509 30184 11,410.00 2,750.00 4.15
4/19/2022 6510 30300 18,460.00 2,750.00 6.71
4/19/2022 6511 30364 24,210.00 2,750.00 8.80
4/19/2022 6512 30296 22,480.00 2,750.00 8.17
4/19/2022 6513 30807 20,670.00 2,750.00 7.52
4/19/2022 6514 30386 17,830.00 2,750.00 6.48
4/19/2022 6515 30365 19,030.00 2,750.00 6.92
4/19/2022 6516 30303 15,700.00 2,750.00 5.71
4/19/2022 6517 30358 21,210.00 2,750.00 7.71
4/19/2022 6518 30443 19,650.00 2,750.00 7.15
4/19/2022 6519 30817 17,830.00 2,750.00 6.48
4/19/2022 6520 30274 19,790.00 2,750.00 7.20
4/19/2022 6521 30164 11,270.00 2,750.00 4.10
4/19/2022 6522 30364 16,150.00 2,750.00 5.87
4/19/2022 6523 30807 16,170.00 2,750.00 5.88
4/19/2022 6524 30173 13,090.00 2,750.00 4.76
4/19/2022 6525 30448 15,460.00 2,750.00 5.62
4/19/2022 6526 30296 18,920.00 2,750.00 6.88
4/19/2022 6527 30358 21,730.00 2,750.00 7.90
4/19/2022 6528 30300 16,890.00 2,750.00 6.14
4/19/2022 6529 30365 18,050.00 2,750.00 6.56
4/19/2022 6530 30386 14,470.00 2,750.00 5.26
4/19/2022 6531 30817 13,120.00 2,750.00 4.77
4/19/2022 6532 30274 19,920.00 2,750.00 7.24
4/19/2022 6533 30443 17,680.00 2,750.00 6.43
4/19/2022 6534 30303 18,390.00 2,750.00 6.69
4/19/2022 6535 30807 16,880.00 2,750.00 6.14
4/19/2022 6536 30273 20,160.00 2,750.00 7.33
4/19/2022 6537 30364 22,090.00 2,750.00 8.03
4/19/2022 6538 30297 22,350.00 2,750.00 8.13
4/19/2022 6539 30173 16,830.00 2,750.00 6.12
4/19/2022 6540 30445 14,210.00 2,750.00 5.17
4/19/2022 6541 30164 11,560.00 2,750.00 4.20
4/19/2022 6542 30358 21,940.00 2,750.00 7.98
4/19/2022 6543 30365 19,210.00 2,750.00 6.99
4/19/2022 6544 30296 18,040.00 2,750.00 6.56
4/19/2022 6545 30300 18,770.00 2,750.00 6.83
4/19/2022 6546 30275 20,630.00 2,750.00 7.50
4/19/2022 6547 30274 15,240.00 2,750.00 5.54
4/19/2022 6548 30807 18,000.00 2,750.00 6.55
4/19/2022 6549 30443 18,340.00 2,750.00 6.67
4/19/2022 6550 30386 16,810.00 2,750.00 6.11
4/19/2022 6551 30303 16,600.00 2,750.00 6.04
4/19/2022 6552 30184 12,940.00 2,750.00 4.71
4/19/2022 6553 30448 19,080.00 2,750.00 6.94
4/19/2022 6554 30297 21,240.00 2,750.00 7.72
4/19/2022 6555 30364 19,760.00 2,750.00 7.19
4/19/2022 6556 30173 17,770.00 2,750.00 6.46
4/19/2022 6557 30164 13,500.00 2,750.00 4.91
4/19/2022 6558 30273 19,100.00 2,750.00 6.95
4/19/2022 6559 30817 16,680.00 2,750.00 6.07
4/19/2022 6560 30274 20,260.00 2,750.00 7.37
4/19/2022 6561 30365 21,420.00 2,750.00 7.79
4/19/2022 6562 30296 18,900.00 2,750.00 6.87
4/19/2022 6563 1036 30,910.00 2,750.00 11.24
4/19/2022 6564 30445 15,890.00 2,750.00 5.78
4/19/2022 6565 30807 16,160.00 2,750.00 5.88
4/19/2022 6566 30300 16,670.00 2,750.00 6.06
4/19/2022 6567 30275 17,680.00 2,750.00 6.43
4/19/2022 6568 30303 18,250.00 2,750.00 6.64
4/19/2022 6569 30184 12,340.00 2,750.00 4.49
4/19/2022 6570 30386 14,620.00 2,750.00 5.32
4/19/2022 6571 30164 10,750.00 2,750.00 3.91
4/19/2022 6572 30173 14,820.00 2,750.00 5.39
4/19/2022 6573 30297 20,030.00 2,750.00 7.28
4/19/2022 6574 30448 5,160.00 2,750.00 1.88
4/19/2022 6575 30300 18,260.00 2,750.00 6.64
4/19/2022 6576 30364 15,970.00 2,750.00 5.81
4/19/2022 6577 30274 15,050.00 2,750.00 5.47
4/19/2022 6578 30273 15,780.00 2,750.00 5.74
4/19/2022 6579 30807 17,490.00 2,750.00 6.36
4/19/2022 6580 30562 15,640.00 2,750.00 5.69
4/19/2022 6581 30817 13,720.00 2,750.00 4.99
4/19/2022 6582 30275 16,660.00 2,750.00 6.06
4/19/2022 6583 30445 13,700.00 2,750.00 4.98
4/19/2022 6584 30443 15,630.00 2,750.00 5.68
4/19/2022 6585 30303 16,900.00 2,750.00 6.15
4/19/2022 6586 30386 14,200.00 2,750.00 5.16
4/19/2022 6587 30164 14,360.00 2,750.00 5.22
4/19/2022 6588 30184 11,780.00 2,750.00 4.28
4/19/2022 6589 30297 17,360.00 2,750.00 6.31
4/19/2022 6590 30173 18,460.00 2,750.00 6.71
829.04
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
4/20/2022 6609 3096 18,080.00 2,750.00 6.57
4/20/2022 6627 3096 18,000.00 2,750.00 6.55
4/20/2022 6644 3096 17,590.00 2,750.00 6.40
4/20/2022 6655 3096 17,750.00 2,750.00 6.45
4/20/2022 6698 3096 13,410.00 2,750.00 4.88
4/20/2022 6724 3096 18,450.00 2,750.00 6.71
6.26
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 52+400


1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+500
1.00 Bolon 53+900
1.00 Bolon 53+900
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (8
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
4/21/2022 6735 30364 23,240.00 2,750.00 8.45
4/21/2022 6736 30817 16,030.00 2,750.00 5.83
4/21/2022 6737 30300 18,810.00 2,750.00 6.84
4/21/2022 6738 30274 21,870.00 2,750.00 7.95
4/21/2022 6739 30303 22,880.00 2,750.00 8.32
4/21/2022 6740 30294 18,760.00 2,750.00 6.82
4/21/2022 6741 30358 21,050.00 2,750.00 7.65
4/21/2022 6742 30113 14,830.00 2,750.00 5.39
4/21/2022 6743 30443 19,410.00 2,750.00 7.06
4/21/2022 6744 30184 15,850.00 2,750.00 5.76
4/21/2022 6745 30297 23,310.00 2,750.00 8.48
4/21/2022 6746 30273 22,540.00 2,750.00 8.20
4/21/2022 6747 30275 20,080.00 2,750.00 7.30
4/21/2022 6748 30365 20,040.00 2,750.00 7.29
4/21/2022 6749 30445 20,000.00 2,750.00 7.27
4/21/2022 6750 30386 17,430.00 2,750.00 6.34
4/21/2022 6751 30364 24,160.00 2,750.00 8.79
4/21/2022 6752 30817 19,030.00 2,750.00 6.92
4/21/2022 6753 30243 22,030.00 2,750.00 8.01
4/21/2022 6754 30164 24,480.00 2,750.00 8.90
4/21/2022 6755 30113 13,520.00 2,750.00 4.92
4/21/2022 6756 30274 21,080.00 2,750.00 7.67
4/21/2022 6757 30358 25,010.00 2,750.00 9.09
4/21/2022 6758 30300 21,990.00 2,750.00 8.00
4/21/2022 6759 30438 14,300.00 2,750.00 5.20
4/21/2022 6760 30443 19,600.00 2,750.00 7.13
4/21/2022 6761 30296 20,900.00 2,750.00 7.60
4/21/2022 6762 30297 21,960.00 2,750.00 7.99
4/21/2022 6763 30303 22,220.00 2,750.00 8.08
4/21/2022 6764 30360 21,710.00 2,750.00 7.89
4/21/2022 6765 30184 10,820.00 2,750.00 3.93
4/21/2022 6766 30807 21,130.00 2,750.00 7.68
4/21/2022 6767 30817 16,660.00 2,750.00 6.06
4/21/2022 6768 30275 22,140.00 2,750.00 8.05
4/21/2022 6769 30365 24,630.00 2,750.00 8.96
4/21/2022 6770 30294 19,420.00 2,750.00 7.06
4/21/2022 6771 30358 24,900.00 2,750.00 9.05
4/21/2022 6772 30445 14,630.00 2,750.00 5.32
4/21/2022 6773 30113 16,560.00 2,750.00 6.02
4/21/2022 6774 30243 20,570.00 2,750.00 7.48
4/21/2022 6775 30386 16,240.00 2,750.00 5.91
4/21/2022 6776 30364 24,400.00 2,750.00 8.87
4/21/2022 6777 30273 25,290.00 2,750.00 9.20
4/21/2022 6778 30297 21,360.00 2,750.00 7.77
4/21/2022 6779 30443 20,880.00 2,750.00 7.59
4/21/2022 6780 30817 16,870.00 2,750.00 6.13
4/21/2022 6781 30296 22,210.00 2,750.00 8.08
4/21/2022 6782 30184 14,460.00 2,750.00 5.26
4/21/2022 6783 30164 14,410.00 2,750.00 5.24
4/21/2022 6784 30438 15,230.00 2,750.00 5.54
4/21/2022 6785 30274 21,340.00 2,750.00 7.76
4/21/2022 6786 30807 16,860.00 2,750.00 6.13
4/21/2022 6787 30365 18,170.00 2,750.00 6.61
4/21/2022 6788 30358 22,890.00 2,750.00 8.32
4/21/2022 6789 30303 17,720.00 2,750.00 6.44
4/21/2022 6790 30364 20,690.00 2,750.00 7.52
4/21/2022 6791 30275 21,940.00 2,750.00 7.98
4/21/2022 6792 30445 12,170.00 2,750.00 4.43
4/21/2022 6793 3096 17,410.00 2,750.00 6.33
4/21/2022 6794 30297 19,560.00 2,750.00 7.11
4/21/2022 6795 30273 20,510.00 2,750.00 7.46
4/21/2022 6796 30164 17,890.00 2,750.00 6.51
4/21/2022 6797 30807 14,890.00 2,750.00 5.41
4/21/2022 6798 30113 11,240.00 2,750.00 4.09
4/21/2022 6799 30243 21,180.00 2,750.00 7.70
4/21/2022 6800 30386 17,010.00 2,750.00 6.19
4/21/2022 6801 30296 19,260.00 2,750.00 7.00
4/21/2022 6802 30493 16,630.00 2,750.00 6.05
4/21/2022 6803 30274 20,410.00 2,750.00 7.42
4/21/2022 6804 30443 17,960.00 2,750.00 6.53
4/21/2022 6805 30144 14,480.00 2,750.00 5.27
4/21/2022 6806 30364 18,770.00 2,750.00 6.83
4/21/2022 6807 30365 19,710.00 2,750.00 7.17
4/21/2022 6808 30300 19,650.00 2,750.00 7.15
4/21/2022 6809 30817 15,060.00 2,750.00 5.48
4/21/2022 6810 30358 20,440.00 2,750.00 7.43
4/21/2022 6811 30303 19,410.00 2,750.00 7.06
4/21/2022 6812 30438 16,510.00 2,750.00 6.00
4/21/2022 6813 30360 21,290.00 2,750.00 7.74
4/21/2022 6814 30184 10,980.00 2,750.00 3.99
4/21/2022 6815 30335 15,510.00 2,750.00 5.64
4/21/2022 6816 30275 17,810.00 2,750.00 6.48
4/21/2022 6817 30153 13,920.00 2,750.00 5.06
4/21/2022 6818 30273 25,000.00 2,750.00 9.09
4/21/2022 6819 30297 19,210.00 2,750.00 6.99
4/21/2022 6820 30243 21,650.00 2,750.00 7.87
4/21/2022 6821 30562 15,520.00 2,750.00 5.64
4/21/2022 6822 30474 17,070.00 2,750.00 6.21
4/21/2022 6823 30445 14,010.00 2,750.00 5.09
4/21/2022 6824 30296 17,150.00 2,750.00 6.24
4/21/2022 6825 30274 20,900.00 2,750.00 7.60
4/21/2022 6826 30364 18,000.00 2,750.00 6.55
4/21/2022 6827 30807 15,650.00 2,750.00 5.69
4/21/2022 6828 3096 17,170.00 2,750.00 6.24
4/21/2022 6829 30279 19,210.00 2,750.00 6.99
4/21/2022 6830 30144 16,360.00 2,750.00 5.95
4/21/2022 6832 30360 20,070.00 2,750.00 7.30
4/21/2022 6833 30274 22,620.00 2,750.00 8.23
4/21/2022 6835 30358 19,710.00 2,750.00 7.17
4/21/2022 6836 30445 18,060.00 2,750.00 6.57
4/21/2022 6837 30807 19,780.00 2,750.00 7.19
4/21/2022 6838 30335 16,590.00 2,750.00 6.03
4/21/2022 6839 30153 14,140.00 2,750.00 5.14
4/21/2022 6840 30297 22,240.00 2,750.00 8.09
4/21/2022 6841 30164 13,480.00 2,750.00 4.90
4/21/2022 6842 30817 14,880.00 2,750.00 5.41
4/21/2022 6843 30296 24,030.00 2,750.00 8.74
4/21/2022 6844 3096 18,910.00 2,750.00 6.88
4/21/2022 6845 30243 20,330.00 2,750.00 7.39
4/21/2022 6846 30291 10,980.00 2,750.00 3.99
4/21/2022 6847 30300 19,270.00 2,750.00 7.01
4/21/2022 6848 30365 23,460.00 2,750.00 8.53
4/21/2022 6849 30386 16,250.00 2,750.00 5.91
4/21/2022 6850 30273 20,570.00 2,750.00 7.48
4/21/2022 6851 30360 19,830.00 2,750.00 7.21
4/21/2022 6852 30443 19,820.00 2,750.00 7.21
4/21/2022 6853 30294 19,070.00 2,750.00 6.93
4/21/2022 6854 30303 22,900.00 2,750.00 8.33
4/21/2022 6855 30274 19,800.00 2,750.00 7.20
4/21/2022 6856 30807 16,580.00 2,750.00 6.03
4/21/2022 6857 30364 18,230.00 2,750.00 6.63
4/21/2022 6858 30193 12,870.00 2,750.00 4.68
4/21/2022 6859 30295 21,050.00 2,750.00 7.65
4/21/2022 6860 30445 17,870.00 2,750.00 6.50
4/21/2022 6861 30113 2,500.00 2,750.00 0.91
4/21/2022 6862 30335 17,810.00 2,750.00 6.48
4/21/2022 6863 30153 15,480.00 2,750.00 5.63
4/21/2022 6864 30358 15,100.00 2,750.00 5.49
4/21/2022 6865 30297 19,770.00 2,750.00 7.19
4/21/2022 6866 3096 19,050.00 2,750.00 6.93
4/21/2022 6867 30817 15,960.00 2,750.00 5.80
4/21/2022 6868 30443 11,750.00 2,750.00 4.27
4/21/2022 6869 30243 18,880.00 2,750.00 6.87
4/21/2022 6870 30365 17,230.00 2,750.00 6.27
4/21/2022 6871 30360 16,580.00 2,750.00 6.03
4/21/2022 6872 30273 17,060.00 2,750.00 6.20
4/21/2022 6873 30296 16,060.00 2,750.00 5.84
4/21/2022 6874 30807 14,600.00 2,750.00 5.31
4/21/2022 6875 30274 15,800.00 2,750.00 5.75
4/21/2022 6876 30364 17,420.00 2,750.00 6.33
4/21/2022 6877 30164 10,850.00 2,750.00 3.95
4/21/2022 6878 30386 11,120.00 2,750.00 4.04
4/21/2022 6879 30291 12,920.00 2,750.00 4.70
4/21/2022 6880 30303 16,270.00 2,750.00 5.92
4/21/2022 6881 30275 19,800.00 2,750.00 7.20
4/21/2022 6882 30300 17,550.00 2,750.00 6.38
4/21/2022 6883 30193 11,700.00 2,750.00 4.25
4/21/2022 6884 30294 20,080.00 2,750.00 7.30
4/21/2022 6885 30445 15,020.00 2,750.00 5.46
991.61
ahsa – Puerto Cabezas (85.65km)”

raplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
4/22/2022 6887 30300 14,220.00 2,750.00 5.17
4/22/2022 6888 30807 15,230.00 2,750.00 5.54
4/22/2022 6889 30335 15,550.00 2,750.00 5.65
4/22/2022 6890 30274 18,310.00 2,750.00 6.66
4/22/2022 6891 30817 13,780.00 2,750.00 5.01
4/22/2022 6892 30193 12,980.00 2,750.00 4.72
4/22/2022 6893 30113 11,110.00 2,750.00 4.04
4/22/2022 6894 30360 18,500.00 2,750.00 6.73
4/22/2022 6895 30817 14,410.00 2,750.00 5.24
4/22/2022 6896 30164 12,130.00 2,750.00 4.41
4/22/2022 6897 30443 16,050.00 2,750.00 5.84
4/22/2022 6898 30445 15,810.00 2,750.00 5.75
4/22/2022 6899 30358 18,760.00 2,750.00 6.82
4/22/2022 6900 30297 17,630.00 2,750.00 6.41
4/22/2022 6901 30303 18,210.00 2,750.00 6.62
4/22/2022 6902 30365 16,090.00 2,750.00 5.85
4/22/2022 6903 30291 10,900.00 2,750.00 3.96
4/22/2022 6904 30144 13,200.00 2,750.00 4.80
4/22/2022 6905 30184 12,590.00 2,750.00 4.58
4/22/2022 6906 30153 11,560.00 2,750.00 4.20
4/22/2022 6907 30300 17,740.00 2,750.00 6.45
4/22/2022 6908 30807 15,080.00 2,750.00 5.48
4/22/2022 6909 30275 15,030.00 2,750.00 5.47
4/22/2022 6910 30493 16,920.00 2,750.00 6.15
4/22/2022 6911 3096 15,520.00 2,750.00 5.64
4/22/2022 6912 30294 19,220.00 2,750.00 6.99
4/22/2022 6913 30243 19,300.00 2,750.00 7.02
4/22/2022 6914 30113 12,620.00 2,750.00 4.59
4/22/2022 6915 30817 13,280.00 2,750.00 4.83
4/22/2022 6916 30164 14,540.00 2,750.00 5.29
4/22/2022 6918 30445 11,800.00 2,750.00 4.29
4/22/2022 6919 30360 21,260.00 2,750.00 7.73
4/22/2022 6920 30358 21,250.00 2,750.00 7.73
4/22/2022 6921 30364 22,050.00 2,750.00 8.02
4/22/2022 6922 30193 10,740.00 2,750.00 3.91
4/22/2022 6923 30184 10,590.00 2,750.00 3.85
4/22/2022 6924 30291 9,580.00 2,750.00 3.48
4/22/2022 6925 30300 13,490.00 2,750.00 4.91
4/22/2022 6926 30273 23,040.00 2,750.00 8.38
4/22/2022 6927 30807 14,060.00 2,750.00 5.11
4/22/2022 6928 3096 16,720.00 2,750.00 6.08
4/22/2022 6931 30303 20,380.00 2,750.00 7.41
4/22/2022 6932 30164 8,920.00 2,750.00 3.24
4/22/2022 6934 30386 11,870.00 2,750.00 4.32
4/22/2022 6935 30297 20,830.00 2,750.00 7.57
4/22/2022 6936 30445 16,600.00 2,750.00 6.04
4/22/2022 6937 30364 21,030.00 2,750.00 7.65
4/22/2022 6938 30193 12,380.00 2,750.00 4.50
4/22/2022 6939 30817 13,370.00 2,750.00 4.86
4/22/2022 6940 30358 13,840.00 2,750.00 5.03
4/22/2022 6941 30294 16,610.00 2,750.00 6.04
4/22/2022 6942 30243 16,820.00 2,750.00 6.12
4/22/2022 6943 30360 24,260.00 2,750.00 8.82
301.00
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 52+400
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
4/29/2022 7487 30303 16,480.00 2,750.00 5.99
4/29/2022 7488 30365 16,010.00 2,750.00 5.82
4/29/2022 7489 30275 19,450.00 2,750.00 7.07
4/29/2022 7490 30360 18,640.00 2,750.00 6.78
4/29/2022 7491 30358 18,300.00 2,750.00 6.65
4/29/2022 7492 30300 19,860.00 2,750.00 7.22
4/29/2022 7493 30274 16,450.00 2,750.00 5.98
4/29/2022 7494 30297 17,630.00 2,750.00 6.41
4/29/2022 7495 30445 14,200.00 2,750.00 5.16
4/29/2022 7496 30443 17,610.00 2,750.00 6.40
4/29/2022 7497 30438 12,620.00 2,750.00 4.59
4/29/2022 7498 30273 20,060.00 2,750.00 7.29
4/29/2022 7499 3096 14,890.00 2,750.00 5.41
4/29/2022 7500 30294 15,920.00 2,750.00 5.79
4/29/2022 7501 30365 13,760.00 2,750.00 5.00
4/29/2022 7502 30303 14,080.00 2,750.00 5.12
4/29/2022 7503 30360 19,920.00 2,750.00 7.24
4/29/2022 7504 30358 19,910.00 2,750.00 7.24
4/29/2022 7505 30562 16,470.00 2,750.00 5.99
4/29/2022 7506 30275 20,000.00 2,750.00 7.27
4/29/2022 7507 30296 15,930.00 2,750.00 5.79
4/29/2022 7508 30364 18,530.00 2,750.00 6.74
4/29/2022 7509 30297 17,980.00 2,750.00 6.54
4/29/2022 7510 30274 19,880.00 2,750.00 7.23
4/29/2022 7511 30438 13,320.00 2,750.00 4.84
4/29/2022 7512 30443 18,080.00 2,750.00 6.57
4/29/2022 7513 30273 17,930.00 2,750.00 6.52
4/29/2022 7514 30300 19,170.00 2,750.00 6.97
4/29/2022 7515 3096 15,780.00 2,750.00 5.74
4/29/2022 7516 30294 13,410.00 2,750.00 4.88
4/29/2022 7517 30360 17,660.00 2,750.00 6.42
4/29/2022 7519 30297 18,910.00 2,750.00 6.88
4/29/2022 7520 30303 15,910.00 2,750.00 5.79
4/29/2022 7521 30275 19,530.00 2,750.00 7.10
4/29/2022 7522 30274 18,650.00 2,750.00 6.78
4/29/2022 7523 30443 17,260.00 2,750.00 6.28
4/29/2022 7524 30438 15,370.00 2,750.00 5.59
4/29/2022 7525 30273 15,220.00 2,750.00 5.53
4/29/2022 7526 30364 20,880.00 2,750.00 7.59
4/29/2022 7527 30445 16,970.00 2,750.00 6.17
4/29/2022 7528 30358 17,640.00 2,750.00 6.41
4/29/2022 7529 30300 11,930.00 2,750.00 4.34
4/29/2022 7530 3096 17,630.00 2,750.00 6.41
4/29/2022 7531 30173 15,590.00 2,750.00 5.67
4/29/2022 7532 30443 18,440.00 2,750.00 6.71
4/29/2022 7533 30364 15,470.00 2,750.00 5.63
4/29/2022 7534 30438 16,170.00 2,750.00 5.88
4/29/2022 7535 30294 14,560.00 2,750.00 5.29
4/29/2022 7536 30303 15,420.00 2,750.00 5.61
4/29/2022 7537 30275 17,500.00 2,750.00 6.36
4/29/2022 7538 30273 17,370.00 2,750.00 6.32
4/29/2022 7539 30296 19,510.00 2,750.00 7.09
4/29/2022 7540 30358 18,020.00 2,750.00 6.55
4/29/2022 7541 30365 13,790.00 2,750.00 5.01
4/29/2022 7542 30364 15,270.00 2,750.00 5.55
4/29/2022 7543 30300 13,430.00 2,750.00 4.88
4/29/2022 7544 30443 17,420.00 2,750.00 6.33
4/29/2022 7545 3096 15,960.00 2,750.00 5.80
4/29/2022 7546 30445 17,450.00 2,750.00 6.35
4/29/2022 7547 30438 13,000.00 2,750.00 4.73
4/29/2022 7548 30386 18,590.00 2,750.00 6.76
4/29/2022 7549 30173 20,310.00 2,750.00 7.39
4/29/2022 7550 30294 18,550.00 2,750.00 6.75
4/29/2022 7551 30358 17,850.00 2,750.00 6.49
4/29/2022 7552 30365 15,350.00 2,750.00 5.58
4/29/2022 7553 30275 19,150.00 2,750.00 6.96
4/29/2022 7554 19,540.00 2,750.00 7.11
4/29/2022 7555 30300 17,950.00 2,750.00 6.53
4/29/2022 7556 30364 14,430.00 2,750.00 5.25
4/29/2022 7557 30445 16,590.00 2,750.00 6.03
4/29/2022 7558 3096 14,680.00 2,750.00 5.34
4/29/2022 7559 30386 16,030.00 2,750.00 5.83
4/29/2022 7560 30273 16,870.00 2,750.00 6.13
4/29/2022 7561 30443 16,040.00 2,750.00 5.83
455.27
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
4/30/2022 7562 30817 15,580.00 2,750.00 5.67
4/30/2022 7563 30300 15,330.00 2,750.00 5.57
4/30/2022 7564 30445 17,200.00 2,750.00 6.25
4/30/2022 7565 30275 17,720.00 2,750.00 6.44
4/30/2022 7566 30365 16,000.00 2,750.00 5.82
4/30/2022 7567 30273 17,900.00 2,750.00 6.51
4/30/2022 7568 30297 16,940.00 2,750.00 6.16
4/30/2022 7569 30294 15,520.00 2,750.00 5.64
4/30/2022 7570 30562 16,830.00 2,750.00 6.12
4/30/2022 7571 30274 17,770.00 2,750.00 6.46
4/30/2022 7572 30113 16,480.00 2,750.00 5.99
4/30/2022 7573 30386 17,460.00 2,750.00 6.35
4/30/2022 7574 30438 12,770.00 2,750.00 4.64
4/30/2022 7575 30364 14,130.00 2,750.00 5.14
4/30/2022 7576 30173 13,160.00 2,750.00 4.79
4/30/2022 7577 30358 17,230.00 2,750.00 6.27
4/30/2022 7578 30360 20,000.00 2,750.00 7.27
4/30/2022 7579 30443 15,810.00 2,750.00 5.75
4/30/2022 7580 30300 15,610.00 2,750.00 5.68
4/30/2022 7581 30365 16,900.00 2,750.00 6.15
4/30/2022 7582 3096 15,440.00 2,750.00 5.61
4/30/2022 7583 30275 20,060.00 2,750.00 7.29
4/30/2022 7584 30303 12,740.00 2,750.00 4.63
4/30/2022 7585 30273 19,500.00 2,750.00 7.09
4/30/2022 7587 30365 6,660.00 2,750.00 2.42
4/30/2022 7589 30360 17,260.00 2,750.00 6.28
4/30/2022 7590 30275 13,960.00 2,750.00 5.08
4/30/2022 7591 30274 13,360.00 2,750.00 4.86
4/30/2022 7592 17,660.00 2,750.00 6.42
4/30/2022 7594 30438 13,650.00 2,750.00 4.96
4/30/2022 7595 30364 16,590.00 2,750.00 6.03
4/30/2022 7596 30299 17,440.00 2,750.00 6.34
4/30/2022 7597 3096 16,460.00 2,750.00 5.99
4/30/2022 7598 30817 15,350.00 2,750.00 5.58
4/30/2022 7599 30445 15,970.00 2,750.00 5.81
4/30/2022 7600 15,220.00 2,750.00 5.53
4/30/2022 7601 30297 16,140.00 2,750.00 5.87
4/30/2022 7602 30365 16,930.00 2,750.00 6.16
4/30/2022 7603 30300 14,200.00 2,750.00 5.16
4/30/2022 7604 30296 17,010.00 2,750.00 6.19
4/30/2022 7605 30360 15,320.00 2,750.00 5.57
4/30/2022 7606 30443 16,240.00 2,750.00 5.91
4/30/2022 7607 30275 16,780.00 2,750.00 6.10
4/30/2022 7608 30386 12,100.00 2,750.00 4.40
4/30/2022 7609 30303 18,710.00 2,750.00 6.80
4/30/2022 7610 30297 17,919.00 2,750.00 6.52
4/30/2022 7611 30438 14,900.00 2,750.00 5.42
4/30/2022 7612 30817 12,260.00 2,750.00 4.46
4/30/2022 7613 30113 11,120.00 2,750.00 4.04
4/30/2022 7614 30294 15,300.00 2,750.00 5.56
4/30/2022 7615 30358 21,380.00 2,750.00 7.77
4/30/2022 7616 30364 16,930.00 2,750.00 6.16
4/30/2022 7617 3096 16,470.00 2,750.00 5.99
4/30/2022 7618 30297 18,470.00 2,750.00 6.72
4/30/2022 7619 30810 15,470.00 2,750.00 5.63
4/30/2022 7620 30445 14,230.00 2,750.00 5.17
4/30/2022 7621 30273 16,990.00 2,750.00 6.18
4/30/2022 7622 30365 17,710.00 2,750.00 6.44
4/30/2022 7623 30153 12,560.00 2,750.00 4.57
4/30/2022 7624 30275 10,570.00 2,750.00 3.84
4/30/2022 7625 30360 21,380.00 2,750.00 7.77
4/30/2022 7626 30274 18,823.00 2,750.00 6.84
4/30/2022 7627 30300 14,000.00 2,750.00 5.09
4/30/2022 7628 30303 13,100.00 2,750.00 4.76
4/30/2022 7629 30274 19,540.00 2,750.00 7.11
4/30/2022 7630 30474 12,770.00 2,750.00 4.64
4/30/2022 7631 3096 14,430.00 2,750.00 5.25
4/30/2022 7632 30299 15,130.00 2,750.00 5.50
4/30/2022 7633 30365 16,300.00 2,750.00 5.93
4/30/2022 7634 30438 13,610.00 2,750.00 4.95
4/30/2022 7635 30358 16,160.00 2,750.00 5.88
4/30/2022 7636 30297 16,080.00 2,750.00 5.85
4/30/2022 7637 30193 13,230.00 2,750.00 4.81
4/30/2022 7638 30817 13,690.00 2,750.00 4.98
4/30/2022 7639 30300 10,780.00 2,750.00 3.92
4/30/2022 7640 3094 15,270.00 2,750.00 5.55
4/30/2022 7641 30273 15,140.00 2,750.00 5.51
4/30/2022 7642 30294 12,520.00 2,750.00 4.55
4/30/2022 7643 30303 20,140.00 2,750.00 7.32
4/30/2022 7644 30443 7,720.00 2,750.00 2.81
4/30/2022 7645 30106 11,410.00 2,750.00 4.15
458.39
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
5/1/2022 7718 30106 11,760.00 2,750.00 4.28
4.28
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
5/2/2022 7722 30493 13,800.00 2,750.00 5.02
5/2/2022 7723 30364 16,210.00 2,750.00 5.89
5/2/2022 7724 3096 11,200.00 2,750.00 4.07
5/2/2022 7725 30386 12,360.00 2,750.00 4.49
5/2/2022 7726 30300 13,410.00 2,750.00 4.88
5/2/2022 7727 30358 14,170.00 2,750.00 5.15
5/2/2022 7728 30303 12,200.00 2,750.00 4.44
5/2/2022 7729 30448 10,560.00 2,750.00 3.84
5/2/2022 7730 30443 10,730.00 2,750.00 3.90
5/2/2022 7731 30296 15,060.00 2,750.00 5.48
5/2/2022 7732 30297 14,220.00 2,750.00 5.17
5/2/2022 7733 30106 12,310.00 2,750.00 4.48
5/2/2022 7734 30275 16,490.00 2,750.00 6.00
5/2/2022 7735 30817 11,810.00 2,750.00 4.29
5/2/2022 7736 30273 16,660.00 2,750.00 6.06
5/2/2022 7737 30173 32,900.00 2,750.00 11.96
5/2/2022 7738 30164 9,350.00 2,750.00 3.40
5/2/2022 7739 30274 15,040.00 2,750.00 5.47
5/2/2022 7740 30365 12,430.00 2,750.00 4.52
5/2/2022 7741 30294 14,430.00 2,750.00 5.25
5/2/2022 7742 30364 15,850.00 2,750.00 5.76
5/2/2022 7743 30493 12,020.00 2,750.00 4.37
5/2/2022 7744 2,750.00 0.00
5/2/2022 7745 30807 13,020.00 2,750.00 4.73
5/2/2022 7747 30448 13,210.00 2,750.00 4.80
5/2/2022 7749 3096 14,550.00 2,750.00 5.29
5/2/2022 7750 30386 10,460.00 2,750.00 3.80
5/2/2022 7751 30297 21,640.00 2,750.00 7.87
5/2/2022 7752 30443 13,690.00 2,750.00 4.98
5/2/2022 7754 30144 11,840.00 2,750.00 4.31
5/2/2022 7755 30300 13,440.00 2,750.00 4.89
5/2/2022 7756 30817 11,080.00 2,750.00 4.03
5/2/2022 7757 30113 12,230.00 2,750.00 4.45
5/2/2022 7758 30275 17,180.00 2,750.00 6.25
5/2/2022 7759 30360 14,670.00 2,750.00 5.33
5/2/2022 7760 30173 14,180.00 2,750.00 5.16
5/2/2022 7761 30303 15,060.00 2,750.00 5.48
5/2/2022 7762 30274 14,270.00 2,750.00 5.19
5/2/2022 7763 30106 13,570.00 2,750.00 4.93
5/2/2022 7764 30164 13,150.00 2,750.00 4.78
5/2/2022 7765 30364 13,720.00 2,750.00 4.99
5/2/2022 7766 30474 11,350.00 2,750.00 4.13
5/2/2022 7767 30365 5,310.00 2,750.00 1.93
5/2/2022 7768 30493 10,540.00 2,750.00 3.83
5/2/2022 7769 30296 18,580.00 2,750.00 6.76
5/2/2022 7770 30273 15,790.00 2,750.00 5.74
5/2/2022 7771 30807 12,780.00 2,750.00 4.65
5/2/2022 7772 30125 12,050.00 2,750.00 4.38
5/2/2022 7773 30153 10,070.00 2,750.00 3.66
5/2/2022 7774 30448 14,100.00 2,750.00 5.13
5/2/2022 7775 30299 16,420.00 2,750.00 5.97
5/2/2022 7776 30294 13,750.00 2,750.00 5.00
5/2/2022 7777 30358 17,460.00 2,750.00 6.35
5/2/2022 7778 3096 12,730.00 2,750.00 4.63
5/2/2022 7779 30335 12,350.00 2,750.00 4.49
5/2/2022 7780 30443 13,820.00 2,750.00 5.03
5/2/2022 7781 30297 13,550.00 2,750.00 4.93
5/2/2022 7782 30113 9,350.00 2,750.00 3.40
5/2/2022 7783 2,750.00 0.00
5/2/2022 7784 2,750.00 0.00
5/2/2022 7785 30445 11,350.00 2,750.00 4.13
5/2/2022 7786 30493 13,310.00 2,750.00 4.84
5/2/2022 7787 30144 14,040.00 2,750.00 5.11
5/2/2022 7788 30164 9,370.00 2,750.00 3.41
5/2/2022 7789 30448 14,800.00 2,750.00 5.38
5/2/2022 7790 30807 10,420.00 2,750.00 3.79
5/2/2022 7791 30173 10,890.00 2,750.00 3.96
5/2/2022 7792 30360 11,730.00 2,750.00 4.27
5/2/2022 7793 2,750.00 0.00
5/2/2022 7794 30474 16,690.00 2,750.00 6.07
5/2/2022 7795 30358 17,040.00 2,750.00 6.20
5/2/2022 7796 30106 13,830.00 2,750.00 5.03
5/2/2022 7797 30125 14,730.00 2,750.00 5.36
5/2/2022 7798 30386 9,950.00 2,750.00 3.62
5/2/2022 7799 30297 19,230.00 2,750.00 6.99
5/2/2022 7800 30364 17,810.00 2,750.00 6.48
5/2/2022 7801 30299 17,510.00 2,750.00 6.37
5/2/2022 7802 2,750.00 0.00
5/2/2022 7803 30296 17,240.00 2,750.00 6.27
5/2/2022 7804 30303 20,000.00 2,750.00 7.27
5/2/2022 7805 30273 17,520.00 2,750.00 6.37
5/2/2022 7806 30365 16,890.00 2,750.00 6.14
5/2/2022 7807 30807 11,460.00 2,750.00 4.17
5/2/2022 7808 30443 12,910.00 2,750.00 4.69
5/2/2022 7809 30448 13,850.00 2,750.00 5.04
5/2/2022 7810 30294 14,080.00 2,750.00 5.12
5/2/2022 7811 30493 11,990.00 2,750.00 4.36
5/2/2022 7812 30164 11,910.00 2,750.00 4.33
5/2/2022 7813 30113 10,070.00 2,750.00 3.66
5/2/2022 7814 30122 9,030.00 2,750.00 3.28
5/2/2022 7815 30274 16,870.00 2,750.00 6.13
433.00
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
5/3/2022 7816 30113 21,290.00 2,750.00 7.74
5/3/2022 7817 30360 13,540.00 2,750.00 4.92
5/3/2022 7818 30364 16,460.00 2,750.00 5.99
5/3/2022 7819 30122 12,590.00 2,750.00 4.58
5/3/2022 7820 30817 10,870.00 2,750.00 3.95
5/3/2022 7821 30807 18,200.00 2,750.00 6.62
5/3/2022 7822 30335 14,920.00 2,750.00 5.43
5/3/2022 7823 30300 12,500.00 2,750.00 4.55
5/3/2022 7824 30273 14,060.00 2,750.00 5.11
5/3/2022 7825 30386 9,700.00 2,750.00 3.53
5/3/2022 7826 30299 14,710.00 2,750.00 5.35
5/3/2022 7827 30133 9,220.00 2,750.00 3.35
5/3/2022 7828 30810 14,200.00 2,750.00 5.16
5/3/2022 7829 30153 12,910.00 2,750.00 4.69
5/3/2022 7830 30443 12,830.00 2,750.00 4.67
5/3/2022 7831 30125 13,860.00 2,750.00 5.04
5/3/2022 7832 30493 12,100.00 2,750.00 4.40
5/3/2022 7833 30275 15,470.00 2,750.00 5.63
5/3/2022 7834 30358 16,380.00 2,750.00 5.96
5/3/2022 7835 2,750.00 0.00
5/3/2022 7836 30164 13,040.00 2,750.00 4.74
5/3/2022 7837 2,750.00 0.00
5/3/2022 7838 30297 17,340.00 2,750.00 6.31
5/3/2022 7839 30438 10,230.00 2,750.00 3.72
5/3/2022 7840 30303 14,760.00 2,750.00 5.37
5/3/2022 7841 30274 11,480.00 2,750.00 4.17
5/3/2022 7842 30297 14,690.00 2,750.00 5.34
5/3/2022 7843 30364 16,180.00 2,750.00 5.88
5/3/2022 7844 30360 18,400.00 2,750.00 6.69
5/3/2022 7845 30300 14,300.00 2,750.00 5.20
5/3/2022 7846 30294 14,920.00 2,750.00 5.43
5/3/2022 7847 30807 12,800.00 2,750.00 4.65
5/3/2022 7848 30303 14,970.00 2,750.00 5.44
5/3/2022 7850 3096 16,920.00 2,750.00 6.15
5/3/2022 7852 30443 17,220.00 2,750.00 6.26
5/3/2022 7853 30125 16,560.00 2,750.00 6.02
5/3/2022 7854 30386 12,950.00 2,750.00 4.71
5/3/2022 7855 30493 14,370.00 2,750.00 5.23
5/3/2022 7857 30335 16,290.00 2,750.00 5.92
5/3/2022 7858 30184 7,800.00 2,750.00 2.84
5/3/2022 7859 30274 20,220.00 2,750.00 7.35
5/3/2022 7860 30300 15,060.00 2,750.00 5.48
5/3/2022 7861 30275 12,640.00 2,750.00 4.60
5/3/2022 7862 30122 12,480.00 2,750.00 4.54
5/3/2022 7863 30364 20,480.00 2,750.00 7.45
5/3/2022 7864 30360 18,850.00 2,750.00 6.85
5/3/2022 7865 30438 14,720.00 2,750.00 5.35
5/3/2022 7866 30303 17,460.00 2,750.00 6.35
5/3/2022 7867 30273 15,390.00 2,750.00 5.60
5/3/2022 7868 30296 12,630.00 2,750.00 4.59
5/3/2022 7869 30294 15,350.00 2,750.00 5.58
5/3/2022 7870 30299 17,430.00 2,750.00 6.34
5/3/2022 7871 30184 9,270.00 2,750.00 3.37
5/3/2022 7872 30335 14,340.00 2,750.00 5.21
5/3/2022 7873 30817 810.00 2,750.00 0.29
5/3/2022 7874 30474 10,790.00 2,750.00 3.92
5/3/2022 7875 2,750.00 0.00
5/3/2022 7876 30106 9,560.00 2,750.00 3.48
5/3/2022 7877 30300 13,380.00 2,750.00 4.87
5/3/2022 7878 30364 16,210.00 2,750.00 5.89
5/3/2022 7879 30562 16,100.00 2,750.00 5.85
5/3/2022 7880 30345 12,860.00 2,750.00 4.68
5/3/2022 7881 30122 12,060.00 2,750.00 4.39
5/3/2022 7882 3096 15,930.00 2,750.00 5.79
5/3/2022 7883 30275 18,030.00 2,750.00 6.56
5/3/2022 7884 30365 17,310.00 2,750.00 6.29
5/3/2022 7885 30164 11,470.00 2,750.00 4.17
5/3/2022 7886 30360 20,240.00 2,750.00 7.36
5/3/2022 7887 30193 9,860.00 2,750.00 3.59
5/3/2022 7888 30493 15,610.00 2,750.00 5.68
5/3/2022 7889 30274 17,000.00 2,750.00 6.18
5/3/2022 7890 30810 17,300.00 2,750.00 6.29
5/3/2022 7891 30125 17,990.00 2,750.00 6.54
5/3/2022 7892 30443 16,670.00 2,750.00 6.06
5/3/2022 7893 30303 16,130.00 2,750.00 5.87
5/3/2022 7894 2,750.00 0.00
5/3/2022 7895 30386 12,560.00 2,750.00 4.57
5/3/2022 7896 30273 16,680.00 2,750.00 6.07
5/3/2022 7897 30133 10,280.00 2,750.00 3.74
5/3/2022 7898 30335 15,170.00 2,750.00 5.52
5/3/2022 7899 30184 10,670.00 2,750.00 3.88
5/3/2022 7900 30153 17,330.00 2,750.00 6.30
5/3/2022 7901 30807 12,760.00 2,750.00 4.64
5/3/2022 7902 30122 13,420.00 2,750.00 4.88
5/3/2022 7903 30294 16,180.00 2,750.00 5.88
5/3/2022 7904 30164 8,720.00 2,750.00 3.17
5/3/2022 7905 30364 18,080.00 2,750.00 6.57
5/3/2022 7906 30106 11,210.00 2,750.00 4.08
5/3/2022 7907 30297 17,510.00 2,750.00 6.37
5/3/2022 7908 30448 16,140.00 2,750.00 5.87
5/3/2022 7909 30474 11,150.00 2,750.00 4.05
5/3/2022 7910 30113 10,880.00 2,750.00 3.96
5/3/2022 7911 30360 19,750.00 2,750.00 7.18
5/3/2022 7912 30365 15,890.00 2,750.00 5.78
5/3/2022 7913 30275 14,480.00 2,750.00 5.27
5/3/2022 7914 30358 17,750.00 2,750.00 6.45
5/3/2022 7915 30562 10,900.00 2,750.00 3.96
5/3/2022 7916 30300 16,430.00 2,750.00 5.97
5/3/2022 7917 30810 16,430.00 2,750.00 5.97
5/3/2022 7918 30493 9,850.00 2,750.00 3.58
5/3/2022 7919 30193 12,520.00 2,750.00 4.55
5/3/2022 7920 30335 11,420.00 2,750.00 4.15
5/3/2022 7921 30807 16,660.00 2,750.00 6.06
5/3/2022 7922 30303 15,460.00 2,750.00 5.62
5/3/2022 7923 30817 12,950.00 2,750.00 4.71
5/3/2022 7924 30122 14,210.00 2,750.00 5.17
5/3/2022 7925 30184 11,380.00 2,750.00 4.14
5/3/2022 7926 30153 12,610.00 2,750.00 4.59
5/3/2022 7927 30448 16,450.00 2,750.00 5.98
5/3/2022 7928 30296 16,990.00 2,750.00 6.18
5/3/2022 7929 30297 16,490.00 2,750.00 6.00
5/3/2022 7930 30273 14,260.00 2,750.00 5.19
5/3/2022 7931 30443 15,310.00 2,750.00 5.57
5/3/2022 7932 30299 15,910.00 2,750.00 5.79
5/3/2022 7933 30125 16,520.00 2,750.00 6.01
5/3/2022 7934 30386 16,730.00 2,750.00 6.08
5/3/2022 7935 3096 14,800.00 2,750.00 5.38
5/3/2022 7936 30133 8,660.00 2,750.00 3.15
5/3/2022 7937 30294 15,290.00 2,750.00 5.56
5/3/2022 7938 30106 12,230.00 2,750.00 4.45
5/3/2022 7939 30274 19,820.00 2,750.00 7.21
5/3/2022 7940 30291 15,350.00 2,750.00 5.58
619.98
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 53+300
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+400
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 52+500
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
5/4/2022 7954 30273 14,020.00 2,750.00 5.10
5/4/2022 7980 30273 17,580.00 2,750.00 6.39
5/4/2022 8005 30273 17,550.00 2,750.00 6.38
5/4/2022 8034 30273 18,070.00 2,750.00 6.57
24.44
sa – Puerto Cabezas (85.65km)”

plén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 54+100
1.00 Bolon 54+200
1.00 Bolon 54+200
4.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
5/5/2022 8047 30807 14,400.00 2,750.00 5.24
5/5/2022 8048 30358 17,820.00 2,750.00 6.48
5/5/2022 8049 30817 12,290.00 2,750.00 4.47
5/5/2022 8050 30300 17,290.00 2,750.00 6.29
5/5/2022 8051 30275 15,470.00 2,750.00 5.63
5/5/2022 8052 30299 16,350.00 2,750.00 5.95
5/5/2022 8053 30274 15,530.00 2,750.00 5.65
5/5/2022 8054 30443 16,100.00 2,750.00 5.85
5/5/2022 8055 30493 15,280.00 2,750.00 5.56
5/5/2022 8056 30296 15,600.00 2,750.00 5.67
5/5/2022 8057 30365 17,190.00 2,750.00 6.25
5/5/2022 8058 30303 16,450.00 2,750.00 5.98
5/5/2022 8059 30184 9,430.00 2,750.00 3.43
5/5/2022 8060 30164 9,450.00 2,750.00 3.44
5/5/2022 8061 30113 10,810.00 2,750.00 3.93
5/5/2022 8062 30297 17,800.00 2,750.00 6.47
5/5/2022 8063 30274 15,530.00 2,750.00 5.65
5/5/2022 8064 30443 16,100.00 2,750.00 5.85
5/5/2022 8065 30335 14,610.00 2,750.00 5.31
5/5/2022 8066 30300 17,740.00 2,750.00 6.45
5/5/2022 8067 30364 14,760.00 2,750.00 5.37
5/5/2022 8068 30294 15,840.00 2,750.00 5.76
5/5/2022 8069 30810 16,430.00 2,750.00 5.97
5/5/2022 8070 30562 14,400.00 2,750.00 5.24
5/5/2022 8071 30358 16,760.00 2,750.00 6.09
5/5/2022 8072 30153 14,470.00 2,750.00 5.26
5/5/2022 8073 30275 16,290.00 2,750.00 5.92
5/5/2022 8074 30807 12,500.00 2,750.00 4.55
5/5/2022 8075 30299 18,240.00 2,750.00 6.63
5/5/2022 8076 30273 15,880.00 2,750.00 5.77
5/5/2022 8077 30296 14,990.00 2,750.00 5.45
5/5/2022 8078 30365 15,780.00 2,750.00 5.74
5/5/2022 8079 30303 17,060.00 2,750.00 6.20
5/5/2022 8081 30817 11,190.00 2,750.00 4.07
5/5/2022 8083 30373 14,550.00 2,750.00 5.29
5/5/2022 8084 30184 11,820.00 2,750.00 4.30
5/5/2022 8085 30493 15,630.00 2,750.00 5.68
5/5/2022 8086 3096 13,720.00 2,750.00 4.99
5/5/2022 8088 30164 11,850.00 2,750.00 4.31
5/5/2022 8089 30300 15,690.00 2,750.00 5.71
5/5/2022 8090 30297 15,440.00 2,750.00 5.61
5/5/2022 8091 30358 17,950.00 2,750.00 6.53
5/5/2022 8092 30113 10,960.00 2,750.00 3.99
5/5/2022 8093 30443 18,980.00 2,750.00 6.90
5/5/2022 8094 30335 16,210.00 2,750.00 5.89
5/5/2022 8095 30386 18,270.00 2,750.00 6.64
5/5/2022 8096 30364 17,120.00 2,750.00 6.23
5/5/2022 8097 30275 19,750.00 2,750.00 7.18
5/5/2022 8098 30294 16,210.00 2,750.00 5.89
5/5/2022 8099 30810 14,550.00 2,750.00 5.29
5/5/2022 8100 30153 15,040.00 2,750.00 5.47
5/5/2022 8101 30365 17,830.00 2,750.00 6.48
5/5/2022 8102 30273 20,700.00 2,750.00 7.53
5/5/2022 8103 30299 17,770.00 2,750.00 6.46
5/5/2022 8104 30300 18,540.00 2,750.00 6.74
5/5/2022 8105 30144 13,630.00 2,750.00 4.96
5/5/2022 8106 30364 19,460.00 2,750.00 7.08
5/5/2022 8107 30300 16,120.00 2,750.00 5.86
5/5/2022 8108 30184 10,740.00 2,750.00 3.91
5/5/2022 8109 30443 18,010.00 2,750.00 6.55
5/5/2022 8110 30106 13,380.00 2,750.00 4.87
5/5/2022 8111 30275 20,100.00 2,750.00 7.31
5/5/2022 8112 30358 20,680.00 2,750.00 7.52
5/5/2022 8113 30373 16,120.00 2,750.00 5.86
5/5/2022 8114 30448 15,530.00 2,750.00 5.65
5/5/2022 8115 30386 12,740.00 2,750.00 4.63
5/5/2022 8116 30296 17,490.00 2,750.00 6.36
5/5/2022 8117 3096 13,790.00 2,750.00 5.01
5/5/2022 8118 30817 13,250.00 2,750.00 4.82
5/5/2022 8119 30365 17,480.00 2,750.00 6.36
5/5/2022 8120 30274 19,830.00 2,750.00 7.21
5/5/2022 8121 30273 16,140.00 2,750.00 5.87
5/5/2022 8122 30303 18,650.00 2,750.00 6.78
5/5/2022 8123 30164 10,730.00 2,750.00 3.90
5/5/2022 8124 30113 10,280.00 2,750.00 3.74
5/5/2022 8125 30299 19,110.00 2,750.00 6.95
5/5/2022 8126 30493 17,350.00 2,750.00 6.31
5/5/2022 8127 30125 15,750.00 2,750.00 5.73
5/5/2022 8128 30810 14,950.00 2,750.00 5.44
5/5/2022 8129 30335 14,980.00 2,750.00 5.45
5/5/2022 8130 30297 18,440.00 2,750.00 6.71
5/5/2022 8131 30300 15,830.00 2,750.00 5.76
5/5/2022 8132 30474 22,100.00 2,750.00 8.04
5/5/2022 8133 30153 13,590.00 2,750.00 4.94
5/5/2022 8134 30364 20,960.00 2,750.00 7.62
5/5/2022 8135 30275 17,230.00 2,750.00 6.27
5/5/2022 8136 30807 12,550.00 2,750.00 4.56
5/5/2022 8137 30294 16,840.00 2,750.00 6.12
5/5/2022 8138 30562 13,560.00 2,750.00 4.93
5/5/2022 8139 30184 10,700.00 2,750.00 3.89
5/5/2022 8140 30443 15,050.00 2,750.00 5.47
5/5/2022 8141 30448 18,170.00 2,750.00 6.61
5/5/2022 8142 30350 21,460.00 2,750.00 7.80
5/5/2022 8143 30296 17,450.00 2,750.00 6.35
5/5/2022 8144 30373 17,050.00 2,750.00 6.20
5/5/2022 8145 30817 13,290.00 2,750.00 4.83
5/5/2022 8146 30365 18,230.00 2,750.00 6.63
5/5/2022 8147 30184 9,910.00 2,750.00 3.60
5/5/2022 8148 30296 17,510.00 2,750.00 6.37
5/5/2022 8149 30274 15,260.00 2,750.00 5.55
5/5/2022 8150 30365 17,360.00 2,750.00 6.31
5/5/2022 8151 30273 16,500.00 2,750.00 6.00
5/5/2022 8152 30300 15,340.00 2,750.00 5.58
5/5/2022 8153 30303 16,580.00 2,750.00 6.03
5/5/2022 8154 30299 19,980.00 2,750.00 7.27
5/5/2022 8155 30294 15,380.00 2,750.00 5.59
5/5/2022 8156 30275 18,050.00 2,750.00 6.56
5/5/2022 8157 30184 11,100.00 2,750.00 4.04
5/5/2022 8158 30296 18,940.00 2,750.00 6.89
5/5/2022 8159 30274 14,540.00 2,750.00 5.29
632.62
sa – Puerto Cabezas (85.65km)”

plén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (8
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
5/6/2022 8160 30335 17,200.00 2,750.00 6.25
5/6/2022 8161 30365 16,650.00 2,750.00 6.05
5/6/2022 8162 30273 17,510.00 2,750.00 6.37
5/6/2022 8163 30299 18,700.00 2,750.00 6.80
5/6/2022 8164 30300 15,710.00 2,750.00 5.71
5/6/2022 8165 30303 21,820.00 2,750.00 7.93
5/6/2022 8166 30296 18,250.00 2,750.00 6.64
5/6/2022 8167 30474 14,560.00 2,750.00 5.29
5/6/2022 8168 30275 22,170.00 2,750.00 8.06
5/6/2022 8169 30443 20,190.00 2,750.00 7.34
5/6/2022 8170 30817 15,520.00 2,750.00 5.64
5/6/2022 8171 30448 17,340.00 2,750.00 6.31
5/6/2022 8172 30386 14,840.00 2,750.00 5.40
5/6/2022 8173 30125 17,620.00 2,750.00 6.41
5/6/2022 8174 30810 23,330.00 2,750.00 8.48
5/6/2022 8175 30144 15,030.00 2,750.00 5.47
5/6/2022 8176 30373 15,300.00 2,750.00 5.56
5/6/2022 8177 30184 9,450.00 2,750.00 3.44
5/6/2022 8178 30335 16,290.00 2,750.00 5.92
5/6/2022 8179 30474 17,700.00 2,750.00 6.44
5/6/2022 8180 30358 18,520.00 2,750.00 6.73
5/6/2022 8181 30297 17,280.00 2,750.00 6.28
5/6/2022 8182 30360 19,620.00 2,750.00 7.13
5/6/2022 8183 30106 16,230.00 2,750.00 5.90
5/6/2022 8184 30562 13,180.00 2,750.00 4.79
5/6/2022 8185 30153 16,210.00 2,750.00 5.89
5/6/2022 8186 30807 12,810.00 2,750.00 4.66
5/6/2022 8187 30274 18,290.00 2,750.00 6.65
5/6/2022 8188 30810 15,920.00 2,750.00 5.79
5/6/2022 8189 30125 16,550.00 2,750.00 6.02
5/6/2022 8190 30335 16,890.00 2,750.00 6.14
5/6/2022 8191 30144 16,130.00 2,750.00 5.87
5/6/2022 8192 30303 21,600.00 2,750.00 7.85
5/6/2022 8194 30493 13,400.00 2,750.00 4.87
5/6/2022 8196 2,750.00 0.00
5/6/2022 8197 2,750.00 0.00
5/6/2022 8198 30273 18,340.00 2,750.00 6.67
5/6/2022 8199 30296 19,330.00 2,750.00 7.03
5/6/2022 8201 30299 17,960.00 2,750.00 6.53
5/6/2022 8202 30358 15,560.00 2,750.00 5.66
5/6/2022 8203 30184 9,620.00 2,750.00 3.50
5/6/2022 8204 30807 14,350.00 2,750.00 5.22
5/6/2022 8205 30562 13,710.00 2,750.00 4.99
5/6/2022 8206 30448 15,560.00 2,750.00 5.66
5/6/2022 8207 30443 16,560.00 2,750.00 6.02
5/6/2022 8208 30817 14,180.00 2,750.00 5.16
5/6/2022 8209 30113 11,920.00 2,750.00 4.33
270.85
ahsa – Puerto Cabezas (85.65km)”

raplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (8
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
5/7/2022 8212 30300 14,390.00 2,750.00 5.23
5/7/2022 8213 30299 14,070.00 2,750.00 5.12
5/7/2022 8214 30303 19,870.00 2,750.00 7.23
5/7/2022 8215 30275 22,320.00 2,750.00 8.12
5/7/2022 8216 30365 16,250.00 2,750.00 5.91
5/7/2022 8217 30386 13,060.00 2,750.00 4.75
5/7/2022 8218 30296 16,910.00 2,750.00 6.15
5/7/2022 8219 30438 11,830.00 2,750.00 4.30
5/7/2022 8220 30810 16,090.00 2,750.00 5.85
5/7/2022 8221 30445 17,120.00 2,750.00 6.23
5/7/2022 8222 30360 17,320.00 2,750.00 6.30
5/7/2022 8223 30184 11,170.00 2,750.00 4.06
5/7/2022 8224 30807 16,480.00 2,750.00 5.99
5/7/2022 8225 30448 14,150.00 2,750.00 5.15
5/7/2022 8226 2,750.00 0.00
5/7/2022 8227 30300 15,740.00 2,750.00 5.72
5/7/2022 8228 30273 20,640.00 2,750.00 7.51
5/7/2022 8229 30358 21,760.00 2,750.00 7.91
5/7/2022 8230 30810 15,690.00 2,750.00 5.71
5/7/2022 8231 30303 17,760.00 2,750.00 6.46
5/7/2022 8232 30274 20,510.00 2,750.00 7.46
5/7/2022 8233 30106 12,810.00 2,750.00 4.66
5/7/2022 8234 30365 18,680.00 2,750.00 6.79
5/7/2022 8235 30294 16,570.00 2,750.00 6.03
5/7/2022 8236 30275 16,560.00 2,750.00 6.02
5/7/2022 8237 2,750.00 0.00
5/7/2022 8238 30483 12,670.00 2,750.00 4.61
5/7/2022 8239 30299 15,730.00 2,750.00 5.72
5/7/2022 8240 30164 14,860.00 2,750.00 5.40
5/7/2022 8241 30296 15,780.00 2,750.00 5.74
5/7/2022 8242 30817 14,420.00 2,750.00 5.24
5/7/2022 8243 30113 14,200.00 2,750.00 5.16
5/7/2022 8244 30386 17,410.00 2,750.00 6.33
5/7/2022 8246 30125 14,740.00 2,750.00 5.36
5/7/2022 8248 30483 13,390.00 2,750.00 4.87
5/7/2022 8249 30274 21,150.00 2,750.00 7.69
5/7/2022 8250 30807 13,660.00 2,750.00 4.97
5/7/2022 8251 30184 11,700.00 2,750.00 4.25
5/7/2022 8252 30360 17,880.00 2,750.00 6.50
5/7/2022 8253 30106 12,820.00 2,750.00 4.66
5/7/2022 8254 30300 15,260.00 2,750.00 5.55
5/7/2022 8255 30810 16,890.00 2,750.00 6.14
5/7/2022 8256 30365 18,920.00 2,750.00 6.88
5/7/2022 8257 30275 18,820.00 2,750.00 6.84
5/7/2022 8258 30294 19,000.00 2,750.00 6.91
5/7/2022 8259 30303 17,280.00 2,750.00 6.28
5/7/2022 8260 30364 22,380.00 2,750.00 8.14
5/7/2022 8261 30448 14,970.00 2,750.00 5.44
5/7/2022 8262 30164 15,280.00 2,750.00 5.56
5/7/2022 8263 30273 19,830.00 2,750.00 7.21
5/7/2022 8264 30153 15,150.00 2,750.00 5.51
5/7/2022 8265 30299 18,830.00 2,750.00 6.85
5/7/2022 8266 30483 10,370.00 2,750.00 3.77
5/7/2022 8267 30125 17,660.00 2,750.00 6.42
5/7/2022 8268 30443 17,440.00 2,750.00 6.34
5/7/2022 8269 30817 16,270.00 2,750.00 5.92
5/7/2022 8270 30358 18,980.00 2,750.00 6.90
5/7/2022 8271 30274 16,860.00 2,750.00 6.13
5/7/2022 8272 30296 17,620.00 2,750.00 6.41
5/7/2022 8273 30493 17,410.00 2,750.00 6.33
5/7/2022 8274 30810 17,360.00 2,750.00 6.31
5/7/2022 8275 30365 12,950.00 2,750.00 4.71
5/7/2022 8276 30275 18,460.00 2,750.00 6.71
5/7/2022 8277 30386 16,080.00 2,750.00 5.85
5/7/2022 8278 30300 16,640.00 2,750.00 6.05
5/7/2022 8279 30562 16,140.00 2,750.00 5.87
5/7/2022 8280 30483 11,400.00 2,750.00 4.15
5/7/2022 8281 30125 15,230.00 2,750.00 5.54
5/7/2022 8282 30273 19,760.00 2,750.00 7.19
5/7/2022 8283 30294 19,280.00 2,750.00 7.01
5/7/2022 8284 30360 18,140.00 2,750.00 6.60
5/7/2022 8285 30443 15,270.00 2,750.00 5.55
5/7/2022 8286 30358 20,260.00 2,750.00 7.37
5/7/2022 8287 30299 20,990.00 2,750.00 7.63
5/7/2022 8288 30184 11,730.00 2,750.00 4.27
5/7/2022 8289 30364 24,860.00 2,750.00 9.04
5/7/2022 8290 30275 19,370.00 2,750.00 7.04
5/7/2022 8291 30365 19,140.00 2,750.00 6.96
5/7/2022 8292 30125 15,910.00 2,750.00 5.79
5/7/2022 8293 30483 12,610.00 2,750.00 4.59
5/7/2022 8294 30273 17,850.00 2,750.00 6.49
5/7/2022 8295 30360 16,330.00 2,750.00 5.94
5/7/2022 8296 30125 14,350.00 2,750.00 5.22
5/7/2022 8297 30483 12,760.00 2,750.00 4.64
5/7/2022 8298 30294 20,550.00 2,750.00 7.47
5/7/2022 8299 30358 19,710.00 2,750.00 7.17
5/7/2022 8300 30386 13,260.00 2,750.00 4.82
5/7/2022 8301 30300 14,900.00 2,750.00 5.42
5/7/2022 8302 30364 19,940.00 2,750.00 7.25
5/7/2022 8303 30275 18,820.00 2,750.00 6.84
5/7/2022 8304 30365 15,560.00 2,750.00 5.66
5/7/2022 8305 30443 16,570.00 2,750.00 6.03
5/7/2022 8306 30807 15,640.00 2,750.00 5.69
5/7/2022 8307 30133 13,770.00 2,750.00 5.01
5/7/2022 8308 30274 17,980.00 2,750.00 6.54
5/7/2022 8309 30386 19,080.00 2,750.00 6.94
5/7/2022 8310 30303 25,060.00 2,750.00 9.11
5/7/2022 8311 30296 17,170.00 2,750.00 6.24
5/7/2022 8312 30299 17,020.00 2,750.00 6.19
5/7/2022 8313 30483 10,150.00 2,750.00 3.69
5/7/2022 8314 30125 15,890.00 2,750.00 5.78
5/7/2022 8315 30273 19,380.00 2,750.00 7.05
5/7/2022 8316 30493 16,890.00 2,750.00 6.14
5/7/2022 8317 30448 16,210.00 2,750.00 5.89
5/7/2022 8318 30817 14,840.00 2,750.00 5.40
5/7/2022 8319 30173 13,430.00 2,750.00 4.88
5/7/2022 8320 30294 16,400.00 2,750.00 5.96
5/7/2022 8321 30358 16,890.00 2,750.00 6.14
5/7/2022 8322 30360 17,110.00 2,750.00 6.22
5/7/2022 8323 30184 10,970.00 2,750.00 3.99
5/7/2022 8324 30364 17,120.00 2,750.00 6.23
5/7/2022 8325 30483 10,820.00 2,750.00 3.93
5/7/2022 8326 30300 15,750.00 2,750.00 5.73
5/7/2022 8327 30365 16,820.00 2,750.00 6.12
5/7/2022 8328 30275 17,450.00 2,750.00 6.35
5/7/2022 8329 30445 13,660.00 2,750.00 4.97
5/7/2022 8330 30810 15,680.00 2,750.00 5.70
5/7/2022 8331 30296 17,320.00 2,750.00 6.30
5/7/2022 8332 30358 15,710.00 2,750.00 5.71
5/7/2022 8333 30125 13,840.00 2,750.00 5.03
5/7/2022 8334 30273 18,590.00 2,750.00 6.76
5/7/2022 8335 30360 15,720.00 2,750.00 5.72
5/7/2022 8336 2,750.00 0.00
5/7/2022 8337 30448 22,230.00 2,750.00 8.08
5/7/2022 8338 30164 11,000.00 2,750.00 4.00
5/7/2022 8339 30807 15,050.00 2,750.00 5.47
5/7/2022 8340 30106 10,920.00 2,750.00 3.97
5/7/2022 8341 30493 15,580.00 2,750.00 5.67
5/7/2022 8342 30443 15,480.00 2,750.00 5.63
5/7/2022 8343 30274 16,650.00 2,750.00 6.05
5/7/2022 8344 30817 15,650.00 2,750.00 5.69
5/7/2022 8345 30294 17,670.00 2,750.00 6.43
770.27
ahsa – Puerto Cabezas (85.65km)”

raplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
5/8/2022 8346 30303 12,490.00 2,750.00 4.54
5/8/2022 8347 30483 12,390.00 2,750.00 4.51
5/8/2022 8348 30275 17,230.00 2,750.00 6.27
5/8/2022 8349 30273 14,670.00 2,750.00 5.33
5/8/2022 8350 30358 16,160.00 2,750.00 5.88
5/8/2022 8351 30365 16,310.00 2,750.00 5.93
5/8/2022 8352 30386 14,390.00 2,750.00 5.23
5/8/2022 8353 30299 16,760.00 2,750.00 6.09
5/8/2022 8354 30807 14,090.00 2,750.00 5.12
5/8/2022 8355 2,750.00 0.00
5/8/2022 8356 30443 16,160.00 2,750.00 5.88
5/8/2022 8357 30360 15,140.00 2,750.00 5.51
5/8/2022 8358 30445 14,220.00 2,750.00 5.17
5/8/2022 8359 30297 16,850.00 2,750.00 6.13
5/8/2022 8360 30296 19,280.00 2,750.00 7.01
5/8/2022 8361 30173 14,520.00 2,750.00 5.28
5/8/2022 8362 30364 11,120.00 2,750.00 4.04
5/8/2022 8363 30106 15,980.00 2,750.00 5.81
5/8/2022 8364 30184 10,740.00 2,750.00 3.91
5/8/2022 8365 30817 15,760.00 2,750.00 5.73
5/8/2022 8366 30448 15,920.00 2,750.00 5.79
5/8/2022 8367 30438 17,050.00 2,750.00 6.20
5/8/2022 8368 30300 24,810.00 2,750.00 9.02
5/8/2022 8369 30303 17,000.00 2,750.00 6.18
5/8/2022 8370 30275 18,030.00 2,750.00 6.56
5/8/2022 8371 30358 187,000.00 2,750.00 68.00
5/8/2022 8372 30273 20,930.00 2,750.00 7.61
5/8/2022 8373 30807 15,580.00 2,750.00 5.67
5/8/2022 8374 30365 17,150.00 2,750.00 6.24
5/8/2022 8375 30443 16,460.00 2,750.00 5.99
5/8/2022 8376 30448 17,170.00 2,750.00 6.24
5/8/2022 8377 30297 17,700.00 2,750.00 6.44
5/8/2022 8378 30438 14,210.00 2,750.00 5.17
5/8/2022 8380 30173 15,390.00 2,750.00 5.60
5/8/2022 8382 30364 19,310.00 2,750.00 7.02
5/8/2022 8383 30386 12,780.00 2,750.00 4.65
5/8/2022 8384 30358 20,620.00 2,750.00 7.50
5/8/2022 8385 30817 14,310.00 2,750.00 5.20
5/8/2022 8386 30274 19,710.00 2,750.00 7.17
5/8/2022 8387 30445 12,750.00 2,750.00 4.64
5/8/2022 8388 30360 17,400.00 2,750.00 6.33
5/8/2022 8389 30807 14,310.00 2,750.00 5.20
5/8/2022 8390 30275 17,050.00 2,750.00 6.20
5/8/2022 8391 30300 14,640.00 2,750.00 5.32
5/8/2022 8392 30303 17,270.00 2,750.00 6.28
5/8/2022 8393 30173 14,380.00 2,750.00 5.23
5/8/2022 8394 30133 14,340.00 2,750.00 5.21
5/8/2022 8395 30106 12,920.00 2,750.00 4.70
5/8/2022 8396 30438 15,420.00 2,750.00 5.61
5/8/2022 8397 30817 11,460.00 2,750.00 4.17
5/8/2022 8398 30273 17,690.00 2,750.00 6.43
5/8/2022 8399 30493 16,820.00 2,750.00 6.12
5/8/2022 8400 30364 16,450.00 2,750.00 5.98
5/8/2022 8401 30299 15,010.00 2,750.00 5.46
5/8/2022 8402 30296 18,740.00 2,750.00 6.81
5/8/2022 8403 30438 13,240.00 2,750.00 4.81
5/8/2022 8404 30807 12,880.00 2,750.00 4.68
5/8/2022 8405 30817 11,880.00 2,750.00 4.32
5/8/2022 8406 30365 17,550.00 2,750.00 6.38
5/8/2022 8407 30106 13,870.00 2,750.00 5.04
5/8/2022 8408 30173 17,390.00 2,750.00 6.32
5/8/2022 8409 30294 20,020.00 2,750.00 7.28
5/8/2022 8410 30297 15,790.00 2,750.00 5.74
5/8/2022 8411 30438 15,570.00 2,750.00 5.66
5/8/2022 8412 30133 9,670.00 2,750.00 3.52
5/8/2022 8413 30106 12,610.00 2,750.00 4.59
5/8/2022 8414 30173 11,460.00 2,750.00 4.17
5/8/2022 8415 30275 15,870.00 2,750.00 5.77
5/8/2022 8416 30300 14,880.00 2,750.00 5.41
5/8/2022 8417 30303 16,330.00 2,750.00 5.94
5/8/2022 8418 30273 19,230.00 2,750.00 6.99
5/8/2022 8419 30122 14,390.00 2,750.00 5.23
5/8/2022 8420 30807 14,400.00 2,750.00 5.24
5/8/2022 8421 30299 16,360.00 2,750.00 5.95
5/8/2022 8422 30358 17,450.00 2,750.00 6.35
5/8/2022 8423 30365 16,330.00 2,750.00 5.94
5/8/2022 8424 30274 18,260.00 2,750.00 6.64
497.28
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
5/9/2022 8425 30122 13,670.00 2,750.00 4.97
5/9/2022 8426 30483 11,160.00 2,750.00 4.06
5/9/2022 8427 30275 16,570.00 2,750.00 6.03
5/9/2022 8428 30303 13,960.00 2,750.00 5.08
5/9/2022 8429 30300 15,480.00 2,750.00 5.63
5/9/2022 8430 30294 15,840.00 2,750.00 5.76
5/9/2022 8431 30133 9,280.00 2,750.00 3.37
5/9/2022 8432 30373 15,550.00 2,750.00 5.65
5/9/2022 8433 30296 14,780.00 2,750.00 5.37
5/9/2022 8434 30299 17,040.00 2,750.00 6.20
5/9/2022 8435 30273 15,050.00 2,750.00 5.47
5/9/2022 8436 30358 18,270.00 2,750.00 6.64
5/9/2022 8437 30106 14,010.00 2,750.00 5.09
5/9/2022 8438 30438 12,380.00 2,750.00 4.50
5/9/2022 8439 30365 16,830.00 2,750.00 6.12
5/9/2022 8440 30445 15,160.00 2,750.00 5.51
5/9/2022 8441 30360 18,310.00 2,750.00 6.66
5/9/2022 8442 30386 12,210.00 2,750.00 4.44
5/9/2022 8443 30493 15,560.00 2,750.00 5.66
5/9/2022 8444 30274 20,360.00 2,750.00 7.40
5/9/2022 8445 30443 16,670.00 2,750.00 6.06
5/9/2022 8446 30279 20,010.00 2,750.00 7.28
5/9/2022 8447 30364 16,850.00 2,750.00 6.13
5/9/2022 8448 30173 15,560.00 2,750.00 5.66
5/9/2022 8449 30807 12,310.00 2,750.00 4.48
5/9/2022 8450 30296 17,110.00 2,750.00 6.22
5/9/2022 8451 30294 17,620.00 2,750.00 6.41
5/9/2022 8452 30275 15,730.00 2,750.00 5.72
5/9/2022 8453 30133 10,320.00 2,750.00 3.75
5/9/2022 8454 30438 16,320.00 2,750.00 5.93
5/9/2022 8455 30474 16,060.00 2,750.00 5.84
5/9/2022 8456 30817 13,840.00 2,750.00 5.03
5/9/2022 8457 30303 17,110.00 2,750.00 6.22
5/9/2022 8458 30300 17,480.00 2,750.00 6.36
5/9/2022 8459 30299 15,900.00 2,750.00 5.78
5/9/2022 8460 30106 16,380.00 2,750.00 5.96
5/9/2022 8461 30274 20,530.00 2,750.00 7.47
5/9/2022 8462 30358 21,500.00 2,750.00 7.82
5/9/2022 8463 30273 19,480.00 2,750.00 7.08
5/9/2022 8464 30297 21,900.00 2,750.00 7.96
5/9/2022 8465 30365 18,780.00 2,750.00 6.83
5/9/2022 8466 30364 17,590.00 2,750.00 6.40
5/9/2022 8467 30443 20,750.00 2,750.00 7.55
5/9/2022 8468 30807 17,840.00 2,750.00 6.49
5/9/2022 8469 30445 16,640.00 2,750.00 6.05
5/9/2022 8470 30360 20,860.00 2,750.00 7.59
5/9/2022 8471 30386 16,380.00 2,750.00 5.96
5/9/2022 8472 30133 11,090.00 2,750.00 4.03
5/9/2022 8473 30296 18,670.00 2,750.00 6.79
5/9/2022 8474 30303 17,850.00 2,750.00 6.49
5/9/2022 8475 30300 17,910.00 2,750.00 6.51
5/9/2022 8476 30294 18,870.00 2,750.00 6.86
5/9/2022 8477 30299 20,500.00 2,750.00 7.45
5/9/2022 8478 30274 20,230.00 2,750.00 7.36
5/9/2022 8479 30364 20,270.00 2,750.00 7.37
5/9/2022 8480 30365 19,500.00 2,750.00 7.09
5/9/2022 8481 30106 16,870.00 2,750.00 6.13
5/9/2022 8482 30297 21,270.00 2,750.00 7.73
5/9/2022 8483 30443 16,960.00 2,750.00 6.17
5/9/2022 8484 30296 21,800.00 2,750.00 7.93
5/9/2022 8485 30807 13,850.00 2,750.00 5.04
5/9/2022 8486 30358 19,000.00 2,750.00 6.91
5/9/2022 8487 30386 13,380.00 2,750.00 4.87
5/9/2022 8488 30360 19,230.00 2,750.00 6.99
5/9/2022 8489 30445 19,560.00 2,750.00 7.11
5/9/2022 8490 30274 20,640.00 2,750.00 7.51
5/9/2022 8491 30303 14,640.00 2,750.00 5.32
5/9/2022 8492 30300 16,390.00 2,750.00 5.96
5/9/2022 8493 30299 16,230.00 2,750.00 5.90
5/9/2022 8494 30364 16,470.00 2,750.00 5.99
5/9/2022 8495 30273 17,160.00 2,750.00 6.24
5/9/2022 8496 30294 14,030.00 2,750.00 5.10
5/9/2022 8497 30297 20,190.00 2,750.00 7.34
5/9/2022 8498 30365 17,340.00 2,750.00 6.31
5/9/2022 8499 30817 10,010.00 2,750.00 3.64
5/9/2022 8500 30274 21,180.00 2,750.00 7.70
5/9/2022 8501 30364 16,520.00 2,750.00 6.01
5/9/2022 8502 30303 16,200.00 2,750.00 5.89
5/9/2022 8503 30300 13,460.00 2,750.00 4.89
5/9/2022 8504 30299 17,550.00 2,750.00 6.38
5/9/2022 8505 30173 15,690.00 2,750.00 5.71
5/9/2022 8506 30294 15,500.00 2,750.00 5.64
5/9/2022 8507 30273 17,530.00 2,750.00 6.37
5/9/2022 8508 30296 17,170.00 2,750.00 6.24
5/9/2022 8509 30297 20,830.00 2,750.00 7.57
5/9/2022 8510 30360 21,510.00 2,750.00 7.82
5/9/2022 8511 30365 19,120.00 2,750.00 6.95
5/9/2022 8512 30807 15,730.00 2,750.00 5.72
5/9/2022 8513 30445 14,610.00 2,750.00 5.31
5/9/2022 8514 30443 14,860.00 2,750.00 5.40
5/9/2022 8515 30350 16,200.00 2,750.00 5.89
5/9/2022 8516 30817 10,880.00 2,750.00 3.96
5/9/2022 8517 30274 17,240.00 2,750.00 6.27
5/9/2022 8518 30364 12,800.00 2,750.00 4.65
5/9/2022 8519 30386 11,680.00 2,750.00 4.25
5/9/2022 8520 30360 19,100.00 2,750.00 6.95
5/9/2022 8521 30133 6,910.00 2,750.00 2.51
5/9/2022 8522 30173 14,880.00 2,750.00 5.41
5/9/2022 8523 30365 17,360.00 2,750.00 6.31
5/9/2022 8524 30303 18,480.00 2,750.00 6.72
5/9/2022 8525 30300 16,250.00 2,750.00 5.91
5/9/2022 8526 30297 16,730.00 2,750.00 6.08
5/9/2022 8527 30299 17,520.00 2,750.00 6.37
5/9/2022 8528 30273 18,900.00 2,750.00 6.87
5/9/2022 8529 30296 15,530.00 2,750.00 5.65
5/9/2022 8530 30294 17,450.00 2,750.00 6.35
TOTALES 641.53
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
5/10/2022 8531 30364 11,420.00 2,750.00 4.15
5/10/2022 8532 30365 14,080.00 2,750.00 5.12
5/10/2022 8533 30445 12,630.00 2,750.00 4.59
5/10/2022 8534 30300 16,070.00 2,750.00 5.84
5/10/2022 8535 30273 16,990.00 2,750.00 6.18
5/10/2022 8536 30386 12,670.00 2,750.00 4.61
5/10/2022 8537 30296 17,320.00 2,750.00 6.30
5/10/2022 8538 30358 15,190.00 2,750.00 5.52
5/10/2022 8539 30274 15,160.00 2,750.00 5.51
5/10/2022 8540 30297 15,460.00 2,750.00 5.62
5/10/2022 8541 30299 17,150.00 2,750.00 6.24
5/10/2022 8542 30443 13,180.00 2,750.00 4.79
5/10/2022 8543 30294 16,700.00 2,750.00 6.07
5/10/2022 8544 30275 16,500.00 2,750.00 6.00
5/10/2022 8545 30360 17,360.00 2,750.00 6.31
5/10/2022 8546 30365 18,620.00 2,750.00 6.77
5/10/2022 8547 30133 6,890.00 2,750.00 2.51
5/10/2022 8548 30445 17,810.00 2,750.00 6.48
5/10/2022 8549 30386 13,080.00 2,750.00 4.76
5/10/2022 8550 30358 20,950.00 2,750.00 7.62
5/10/2022 8551 30296 19,480.00 2,750.00 7.08
5/10/2022 8552 30274 17,710.00 2,750.00 6.44
5/10/2022 8553 30273 17,820.00 2,750.00 6.48
5/10/2022 8554 30275 13,750.00 2,750.00 5.00
5/10/2022 8555 30299 16,930.00 2,750.00 6.16
5/10/2022 8556 30364 13,870.00 2,750.00 5.04
5/10/2022 8557 30294 14,060.00 2,750.00 5.11
5/10/2022 8558 30300 15,760.00 2,750.00 5.73
5/10/2022 8559 30360 18,130.00 2,750.00 6.59
5/10/2022 8560 30445 16,580.00 2,750.00 6.03
5/10/2022 8561 30365 20,560.00 2,750.00 7.48
5/10/2022 8562 30106 15,910.00 2,750.00 5.79
5/10/2022 8563 30386 15,090.00 2,750.00 5.49
5/10/2022 8564 30133 13,630.00 2,750.00 4.96
5/10/2022 8565 30438 16,120.00 2,750.00 5.86
5/10/2022 8566 30296 18,880.00 2,750.00 6.87
5/10/2022 8567 30297 17,740.00 2,750.00 6.45
5/10/2022 8568 30274 16,720.00 2,750.00 6.08
5/10/2022 8569 30173 16,060.00 2,750.00 5.84
5/10/2022 8570 30358 19,550.00 2,750.00 7.11
5/10/2022 8571 30365 13,580.00 2,750.00 4.94
5/10/2022 8572 30364 18,910.00 2,750.00 6.88
5/10/2022 8573 30273 18,180.00 2,750.00 6.61
5/10/2022 8574 30294 14,670.00 2,750.00 5.33
5/10/2022 8575 30817 14,050.00 2,750.00 5.11
5/10/2022 8576 30358 20,850.00 2,750.00 7.58
5/10/2022 8577 30300 18,960.00 2,750.00 6.89
5/10/2022 8578 30296 17,240.00 2,750.00 6.27
5/10/2022 8579 30360 16,150.00 2,750.00 5.87
5/10/2022 8580 30445 18,710.00 2,750.00 6.80
5/10/2022 8581 30173 17,230.00 2,750.00 6.27
5/10/2022 8582 30274 17,360.00 2,750.00 6.31
5/10/2022 8583 30297 20,970.00 2,750.00 7.63
5/10/2022 8584 30106 14,840.00 2,750.00 5.40
5/10/2022 8585 30807 19,280.00 2,750.00 7.01
5/10/2022 8586 30438 16,160.00 2,750.00 5.88
5/10/2022 8587 30493 24,120.00 2,750.00 8.77
5/10/2022 8588 30364 19,580.00 2,750.00 7.12
5/10/2022 8589 30365 16,930.00 2,750.00 6.16
5/10/2022 8590 30164 11,170.00 2,750.00 4.06
5/10/2022 8591 30275 13,500.00 2,750.00 4.91
5/10/2022 8592 30275 14,180.00 2,750.00 5.16
5/10/2022 8593 30273 14,620.00 2,750.00 5.32
5/10/2022 8594 30817 13,840.00 2,750.00 5.03
5/10/2022 8595 30303 11,460.00 2,750.00 4.17
5/10/2022 8596 30448 14,370.00 2,750.00 5.23
5/10/2022 8597 30300 17,610.00 2,750.00 6.40
5/10/2022 8598 30358 21,190.00 2,750.00 7.71
5/10/2022 8599 30443 19,150.00 2,750.00 6.96
5/10/2022 8600 30294 13,300.00 2,750.00 4.84
5/10/2022 8601 30274 17,200.00 2,750.00 6.25
5/10/2022 8602 30360 20,700.00 2,750.00 7.53
5/10/2022 8603 30445 15,250.00 2,750.00 5.55
5/10/2022 8604 30297 20,060.00 2,750.00 7.29
5/10/2022 8605 30364 18,580.00 2,750.00 6.76
5/10/2022 8606 30296 14,270.00 2,750.00 5.19
5/10/2022 8607 30365 15,200.00 2,750.00 5.53
5/10/2022 8608 30275 13,460.00 2,750.00 4.89
5/10/2022 8609 30493 15,650.00 2,750.00 5.69
5/10/2022 8610 30817 14,760.00 2,750.00 5.37
5/10/2022 8611 30303 14,230.00 2,750.00 5.17
5/10/2022 8612 30300 16,130.00 2,750.00 5.87
5/10/2022 8613 30273 18,460.00 2,750.00 6.71
5/10/2022 8614 30294 12,890.00 2,750.00 4.69
5/10/2022 8615 30296 18,980.00 2,750.00 6.90
5/10/2022 8616 30300 890.00 2,750.00 0.32
5/10/2022 8617 30275 15,430.00 2,750.00 5.61
5/10/2022 8618 30299 17,250.00 2,750.00 6.27
5/10/2022 8619 30365 15,770.00 2,750.00 5.73
5/10/2022 8620 30275 16,080.00 2,750.00 5.85
5/10/2022 8621 30273 16,980.00 2,750.00 6.17
5/10/2022 8622 30294 14,430.00 2,750.00 5.25
5/10/2022 8623 30296 17,860.00 2,750.00 6.49
TOTALES 546.28
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
5/11/2022 8624 30275 21,800.00 2,750.00 7.93
5/11/2022 8625 30303 15,010.00 2,750.00 5.46
5/11/2022 8626 30365 18,080.00 2,750.00 6.57
5/11/2022 8627 30358 22,300.00 2,750.00 8.11
5/11/2022 8628 30300 18,800.00 2,750.00 6.84
5/11/2022 8629 30445 18,510.00 2,750.00 6.73
5/11/2022 8630 30273 13,180.00 2,750.00 4.79
5/11/2022 8631 30296 18,160.00 2,750.00 6.60
5/11/2022 8632 30360 21,180.00 2,750.00 7.70
5/11/2022 8633 30448 24,520.00 2,750.00 8.92
5/11/2022 8634 30817 16,850.00 2,750.00 6.13
5/11/2022 8635 30297 21,440.00 2,750.00 7.80
5/11/2022 8636 30364 16,730.00 2,750.00 6.08
5/11/2022 8637 30173 17,880.00 2,750.00 6.50
5/11/2022 8638 30274 16,170.00 2,750.00 5.88
5/11/2022 8639 18,620.00 2,750.00 6.77
5/11/2022 8640 30438 13,480.00 2,750.00 4.90
5/11/2022 8641 30365 17,040.00 2,750.00 6.20
5/11/2022 8642 30275 16,690.00 2,750.00 6.07
5/11/2022 8643 30303 14,210.00 2,750.00 5.17
5/11/2022 8644 30358 19,500.00 2,750.00 7.09
5/11/2022 8645 30448 17,260.00 2,750.00 6.28
5/11/2022 8646 30273 18,010.00 2,750.00 6.55
5/11/2022 8647 30364 23,730.00 2,750.00 8.63
5/11/2022 8648 30300 19,440.00 2,750.00 7.07
5/11/2022 8649 30299 19,650.00 2,750.00 7.15
5/11/2022 8650 30360 18,080.00 2,750.00 6.57
5/11/2022 8651 30296 17,440.00 2,750.00 6.34
5/11/2022 8652 30445 19,000.00 2,750.00 6.91
5/11/2022 8653 30297 20,450.00 2,750.00 7.44
5/11/2022 8654 30807 13,060.00 2,750.00 4.75
5/11/2022 8655 30817 16,870.00 2,750.00 6.13
5/11/2022 8656 30173 19,140.00 2,750.00 6.96
5/11/2022 8657 30274 17,470.00 2,750.00 6.35
5/11/2022 8658 30386 14,210.00 2,750.00 5.17
5/11/2022 8659 30438 17,210.00 2,750.00 6.26
5/11/2022 8660 30365 16,360.00 2,750.00 5.95
5/11/2022 8661 30303 14,410.00 2,750.00 5.24
5/11/2022 8662 30358 22,090.00 2,750.00 8.03
5/11/2022 8663 30448 15,610.00 2,750.00 5.68
5/11/2022 8664 30106 14,450.00 2,750.00 5.25
5/11/2022 8665 30294 11,560.00 2,750.00 4.20
5/11/2022 8666 30273 17,020.00 2,750.00 6.19
5/11/2022 8667 30364 17,170.00 2,750.00 6.24
5/11/2022 8668 30443 17,050.00 2,750.00 6.20
5/11/2022 8669 30299 16,880.00 2,750.00 6.14
5/11/2022 8670 30297 18,740.00 2,750.00 6.81
5/11/2022 8671 30386 11,400.00 2,750.00 4.15
5/11/2022 8672 30817 14,640.00 2,750.00 5.32
5/11/2022 8673 30173 14,080.00 2,750.00 5.12
5/11/2022 8674 30365 17,140.00 2,750.00 6.23
5/11/2022 8675 30360 15,580.00 2,750.00 6.31
5/11/2022 8676 30445 16,940.00 2,750.00 7.63
5/11/2022 8677 30303 14,380.00 2,750.00 5.40
5/11/2022 8678 30448 15,090.00 2,750.00 7.01
5/11/2022 8679 30274 22,940.00 2,750.00 5.88
5/11/2022 8680 24,120.00 2,750.00 0.00
5/11/2022 8681 30296 18,700.00 2,750.00 6.80
5/11/2022 8682 8682 17,550.00 2,750.00 6.38
5/11/2022 8683 30358 19,580.00 2,750.00 7.12
5/11/2022 8684 30106 11,310.00 2,750.00 4.11
5/11/2022 8685 30294 11,300.00 2,750.00 4.11
5/11/2022 8686 30297 18,860.00 2,750.00 6.86
5/11/2022 8687 30273 17,690.00 2,750.00 6.43
5/11/2022 8688 30443 13,060.00 2,750.00 4.75
5/11/2022 8689 30365 15,390.00 2,750.00 5.60
5/11/2022 8690 30299 15,660.00 2,750.00 5.69
5/11/2022 8691 30296 17,030.00 2,750.00 6.19
5/11/2022 8692 30364 19,090.00 2,750.00 6.94
5/11/2022 8693 30386 11,890.00 2,750.00 4.32
5/11/2022 8694 30173 14,810.00 2,750.00 5.39
5/11/2022 8695 30817 12,000.00 2,750.00 4.36
5/11/2022 8696 30106 9,830.00 2,750.00 3.57
5/11/2022 8697 30303 16,120.00 2,750.00 5.86
5/11/2022 8698 30365 14,750.00 2,750.00 5.36
5/11/2022 8699 30294 12,660.00 2,750.00 4.60
5/11/2022 8700 30273 17,740.00 2,750.00 6.45
5/11/2022 8701 30275 17,220.00 2,750.00 6.26
5/11/2022 8702 30299 16,790.00 2,750.00 6.11
5/11/2022 8703 30296 17,410.00 2,750.00 6.33
5/11/2022 8704 30303 14,480.00 2,750.00 5.27
5/11/2022 8705 30365 15,300.00 2,750.00 5.56
5/11/2022 8706 30294 14,490.00 2,750.00 5.27
5/11/2022 8707 30273 16,750.00 2,750.00 6.09
5/11/2022 8708 30296 16,030.00 2,750.00 5.83
5/11/2022 8709 30299 19,800.00 2,750.00 7.20
5/11/2022 8710 30303 16,180.00 2,750.00 5.88
5/11/2022 8711 30275 17,950.00 2,750.00 6.53
TOTALES 533.02
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200 PESO RASTRA
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
5/12/2022 8712 30360 17,510.00 2,750.00 6.37
5/12/2022 8713 30294 13,550.00 2,750.00 4.93
5/12/2022 8714 30445 15,450.00 2,750.00 5.62
5/12/2022 8715 30299 17,780.00 2,750.00 6.47
5/12/2022 8716 30275 20,760.00 2,750.00 7.55
5/12/2022 8717 30365 17,530.00 2,750.00 6.37
5/12/2022 8718 30296 17,440.00 2,750.00 6.34
5/12/2022 8719 30386 21,500.00 2,750.00 7.82
5/12/2022 8720 30448 18,730.00 2,750.00 6.81
5/12/2022 8721 30493 16,920.00 2,750.00 6.15
5/12/2022 8722 30817 12,720.00 2,750.00 4.63
5/12/2022 8723 30807 14,760.00 2,750.00 5.37
5/12/2022 8724 30443 20,120.00 2,750.00 7.32
5/12/2022 8725 30438 13,980.00 2,750.00 5.08
5/12/2022 8726 30273 19,090.00 2,750.00 6.94
5/12/2022 8727 30358 16,570.00 2,750.00 6.03
5/12/2022 8728 30274 21,480.00 2,750.00 7.81
5/12/2022 8729 30297 20,690.00 2,750.00 7.52
5/12/2022 8730 30493 16,500.00 2,750.00 6.00
5/12/2022 8731 30106 17,270.00 2,750.00 6.28
5/12/2022 8732 30275 18,960.00 2,750.00 6.89
5/12/2022 8733 30299 16,880.00 2,750.00 6.14
5/12/2022 8734 30365 14,500.00 2,750.00 5.27
5/12/2022 8735 30294 18,340.00 2,750.00 6.67
5/12/2022 8736 30360 21,230.00 2,750.00 7.72
5/12/2022 8737 30445 17,160.00 2,750.00 6.24
5/12/2022 8738 30448 15,700.00 2,750.00 5.71
5/12/2022 8739 30386 13,470.00 2,750.00 4.90
5/12/2022 8740 0.00 2,750.00 0.00
5/12/2022 8741 30817 15,400.00 2,750.00 5.60
5/12/2022 8742 30273 17,200.00 2,750.00 6.25
5/12/2022 8743 30443 18,550.00 2,750.00 6.75
5/12/2022 8744 30296 17,680.00 2,750.00 6.43
5/12/2022 8745 30438 16,090.00 2,750.00 5.85
5/12/2022 8746 30358 21,130.00 2,750.00 7.68
5/12/2022 8747 30807 13,240.00 2,750.00 4.81
5/12/2022 8748 30299 18,870.00 2,750.00 6.86
5/12/2022 8749 30365 13,450.00 2,750.00 4.89
5/12/2022 8750 30297 19,870.00 2,750.00 7.23
5/12/2022 8751 30106 12,400.00 2,750.00 4.51
5/12/2022 8752 30294 14,220.00 2,750.00 5.17
5/12/2022 8753 30445 18,240.00 2,750.00 6.63
5/12/2022 8754 30448 17,260.00 2,750.00 6.28
5/12/2022 8755 30817 11,810.00 2,750.00 4.29
5/12/2022 8756 30303 12,550.00 2,750.00 4.56
5/12/2022 8757 30358 22,720.00 2,750.00 8.26
5/12/2022 8758 30807 14,570.00 2,750.00 5.30
5/12/2022 8759 30294 11,890.00 2,750.00 4.32
5/12/2022 8760 30448 18,010.00 2,750.00 6.55
5/12/2022 8761 30493 12,280.00 2,750.00 4.47
5/12/2022 8762 30386 10,360.00 2,750.00 3.77
5/12/2022 8763 30817 11,260.00 2,750.00 4.09
5/12/2022 8764 30297 21,710.00 2,750.00 7.89
5/12/2022 8765 30299 15,450.00 2,750.00 5.62
5/12/2022 8766 30360 14,450.00 2,750.00 5.25
5/12/2022 8767 30445 18,540.00 2,750.00 6.74
5/12/2022 8768 30303 14,830.00 2,750.00 5.39
5/12/2022 8769 30296 13,330.00 2,750.00 4.85
5/12/2022 8770 30273 14,020.00 2,750.00 5.10
5/12/2022 8771 30275 17,370.00 2,750.00 6.32
5/12/2022 8772 30365 2,990.00 2,750.00 1.09
5/12/2022 8773 30438 14,610.00 2,750.00 5.31
5/12/2022 8774 30364 18,440.00 2,750.00 6.71
5/12/2022 8775 30358 18,420.00 2,750.00 6.70
5/12/2022 8776 30443 18,500.00 2,750.00 6.73
5/12/2022 8777 0.00 2,750.00 0.00
5/12/2022 8778 30294 12,530.00 2,750.00 4.56
5/12/2022 8779 30386 17,420.00 2,750.00 6.33
5/12/2022 8780 30386 11,830.00 2,750.00 4.30
5/12/2022 8781 30493 12,500.00 2,750.00 4.55
5/12/2022 8782 30297 20,820.00 2,750.00 7.57
5/12/2022 8783 30303 14,750.00 2,750.00 5.36
5/12/2022 8784 30360 16,300.00 2,750.00 5.93
5/12/2022 8785 30817 14,620.00 2,750.00 5.32
5/12/2022 8786 30445 14,980.00 2,750.00 5.45
5/12/2022 8787 30296 14,870.00 2,750.00 5.41
5/12/2022 8788 30273 16,180.00 2,750.00 5.88
5/12/2022 8789 30299 20,040.00 2,750.00 7.29
5/12/2022 8790 30364 18,430.00 2,750.00 6.70
5/12/2022 8791 30438 13,650.00 2,750.00 4.96
5/12/2022 8792 30443 16,660.00 2,750.00 6.06
5/12/2022 8793 30493 18,410.00 2,750.00 6.69
5/12/2022 8794 30358 21,420.00 2,750.00 7.79
5/12/2022 8795 30448 13,360.00 2,750.00 4.86
5/12/2022 8796 30296 11,720.00 2,750.00 4.26
5/12/2022 8797 30360 14,750.00 2,750.00 5.36
5/12/2022 8798 30445 14,230.00 2,750.00 5.17
5/12/2022 8799 30106 13,260.00 2,750.00 4.82
5/12/2022 8800 30297 16,220.00 2,750.00 5.90
5/12/2022 8801 30365 15,110.00 2,750.00 5.49
5/12/2022 8802 30303 16,520.00 2,750.00 6.01
5/12/2022 8803 30273 15,150.00 2,750.00 5.51
5/12/2022 8804 30299 13,640.00 2,750.00 4.96
5/12/2022 8805 30817 10,720.00 2,750.00 3.90
5/12/2022 8806 30807 13,020.00 2,750.00 4.73
5/12/2022 8807 30296 17,990.00 2,750.00 6.54
5/12/2022 8808 30448 10,730.00 2,750.00 3.90
5/12/2022 8809 30386 16,570.00 2,750.00 6.03
5/12/2022 8810 30364 15,610.00 2,750.00 5.68
5/12/2022 8811 30358 17,660.00 2,750.00 6.42
5/12/2022 8812 30438 12,870.00 2,750.00 4.68
5/12/2022 8813 30443 16,060.00 2,750.00 5.84
5/12/2022 8814 30493 11,830.00 2,750.00 4.30
5/12/2022 8815 30294 16,660.00 2,750.00 6.06
TOTALES 591.78
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100 CAMIÒN VACIO
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
5/13/2022 8816 30365 16,310.00 2,750.00 5.93
5/13/2022 8817 30358 13,430.00 2,750.00 4.88
5/13/2022 8818 30303 12,800.00 2,750.00 4.65
5/13/2022 8819 30294 13,750.00 2,750.00 5.00
5/13/2022 8820 30275 16,270.00 2,750.00 5.92
5/13/2022 8821 30273 16,470.00 2,750.00 5.99
5/13/2022 8822 30299 17,270.00 2,750.00 6.28
5/13/2022 8823 30164 12,760.00 2,750.00 4.64
5/13/2022 8824 30365 17,770.00 2,750.00 6.46
5/13/2022 8825 30303 16,880.00 2,750.00 6.14
5/13/2022 8826 30275 17,780.00 2,750.00 6.47
5/13/2022 8827 30133 8,460.00 2,750.00 3.08
5/13/2022 8828 30294 15,540.00 2,750.00 5.65
5/13/2022 8829 30817 9,750.00 2,750.00 3.55
5/13/2022 8830 30445 13,180.00 2,750.00 4.79
5/13/2022 8831 30360 16,520.00 2,750.00 6.01
5/13/2022 8832 30296 18,420.00 2,750.00 6.70
5/13/2022 8833 30365 21,180.00 2,750.00 7.70
5/13/2022 8834 30294 13,750.00 2,750.00 5.00
5/13/2022 8835 30273 20,150.00 2,750.00 7.33
5/13/2022 8836 30275 18,020.00 2,750.00 6.55
5/13/2022 8837 30303 10,860.00 2,750.00 3.95
5/13/2022 8838 30106 8,440.00 2,750.00 3.07
5/13/2022 8839 30173 12,130.00 2,750.00 4.41
5/13/2022 8840 30817 11,560.00 2,750.00 4.20
5/13/2022 8841 30607 11,140.00 2,750.00 4.05
5/13/2022 8842 30294 11,980.00 2,750.00 4.36
5/13/2022 8843 30133 9,350.00 2,750.00 3.40
5/13/2022 8844 30296 19,260.00 2,750.00 7.00
5/13/2022 8845 30275 18,340.00 2,750.00 6.67
5/13/2022 8846 30303 14,160.00 2,750.00 5.15
5/13/2022 8847 30445 14,840.00 2,750.00 5.40
5/13/2022 8848 30364 18,090.00 2,750.00 6.58
5/13/2022 8849 30817 7,900.00 2,750.00 2.87
5/13/2022 8850 30386 5,520.00 2,750.00 2.01
5/13/2022 8851 30273 14,000.00 2,750.00 5.09
5/13/2022 8852 30358 18,920.00 2,750.00 6.88
5/13/2022 8853 30133 8,830.00 2,750.00 3.21
5/13/2022 8854 30817 10,030.00 2,750.00 3.65
5/13/2022 8855 30365 19,340.00 2,750.00 7.03
5/13/2022 8856 30296 15,220.00 2,750.00 5.53
5/13/2022 8857 30294 9,950.00 2,750.00 3.62
5/13/2022 8858 30303 14,230.00 2,750.00 5.17
5/13/2022 8859 30275 17,860.00 2,750.00 6.49
5/13/2022 8860 30364 13,230.00 2,750.00 4.81
5/13/2022 8861 30274 15,130.00 2,750.00 5.50
5/13/2022 8862 30386 12,900.00 2,750.00 4.69
5/13/2022 8863 30297 19,770.00 2,750.00 7.19
5/13/2022 8864 30360 16,650.00 2,750.00 6.05
5/13/2022 8865 30445 13,580.00 2,750.00 4.94
5/13/2022 8866 30273 16,780.00 2,750.00 6.10
5/13/2022 8867 30365 15,250.00 2,750.00 5.55
5/13/2022 8868 30296 19,670.00 2,750.00 7.15
5/13/2022 8869 30358 17,750.00 2,750.00 6.45
5/13/2022 8870 30133 9,290.00 2,750.00 3.38
5/13/2022 8871 30275 17,330.00 2,750.00 6.30
5/13/2022 8872 30364 21,760.00 2,750.00 7.91
5/13/2022 8873 30274 15,660.00 2,750.00 5.69
5/13/2022 8874 30294 17,610.00 2,750.00 6.40
5/13/2022 8875 30297 15,410.00 2,750.00 5.60
5/13/2022 8876 30303 14,430.00 2,750.00 5.25
5/13/2022 8877 30273 16,820.00 2,750.00 6.12
5/13/2022 8878 30296 16,780.00 2,750.00 6.10
5/13/2022 8879 30365 15,740.00 2,750.00 5.72
5/13/2022 8880 30817 11,350.00 2,750.00 4.13
5/13/2022 8881 30360 23,270.00 2,750.00 8.46
5/13/2022 8882 30299 10,490.00 2,750.00 3.81
5/13/2022 8883 30445 14,330.00 2,750.00 5.21
TOTALES 367.05
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100 CAMIÒN VACIO
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
5/14/2022 8884 30365 18,190.00 2,750.00 6.61
5/14/2022 8885 30364 16,230.00 2,750.00 5.90
5/14/2022 8886 30303 15,040.00 2,750.00 5.47
5/14/2022 8887 30296 20,980.00 2,750.00 7.63
5/14/2022 8888 30275 18,920.00 2,750.00 6.88
5/14/2022 8889 30273 20,690.00 2,750.00 7.52
5/14/2022 8890 30358 23,620.00 2,750.00 8.59
5/14/2022 8891 30274 14,930.00 2,750.00 5.43
5/14/2022 8892 30243 17,900.00 2,750.00 6.51
5/14/2022 8893 30297 21,070.00 2,750.00 7.66
5/14/2022 8894 30365 16,880.00 2,750.00 6.14
5/14/2022 8895 0.00 2,750.00 0.00
5/14/2022 8896 30303 15,260.00 2,750.00 5.55
5/14/2022 8897 30364 17,320.00 2,750.00 6.30
5/14/2022 8898 30274 20,920.00 2,750.00 7.61
5/14/2022 8899 30275 16,910.00 2,750.00 6.15
5/14/2022 8900 30299 17,030.00 2,750.00 6.19
5/14/2022 8901 30386 9,740.00 2,750.00 3.54
5/14/2022 8902 30296 2,800.00 2,750.00 1.02
5/14/2022 8903 30133 10,230.00 2,750.00 3.72
5/14/2022 8904 30358 16,410.00 2,750.00 5.97
5/14/2022 8905 0.00 2,750.00 0.00
5/14/2022 8906 30243 16,020.00 2,750.00 5.83
5/14/2022 8907 30297 17,330.00 2,750.00 6.30
5/14/2022 8908 30365 18,060.00 2,750.00 6.57
5/14/2022 8909 30303 14,860.00 2,750.00 5.40
5/14/2022 8910 30364 15,510.00 2,750.00 5.64
5/14/2022 8911 0.00 2,750.00 0.00
5/14/2022 8912 30275 16,360.00 2,750.00 5.95
5/14/2022 8913 30817 16,770.00 2,750.00 6.10
5/14/2022 8914 30299 15,670.00 2,750.00 5.70
5/14/2022 8915 30133 8,630.00 2,750.00 3.14
5/14/2022 8916 30386 9,290.00 2,750.00 3.38
5/14/2022 8917 30358 18,070.00 2,750.00 6.57
5/14/2022 8918 30365 16,130.00 2,750.00 5.87
5/14/2022 8919 30364 16,050.00 2,750.00 5.84
5/14/2022 8920 30297 18,910.00 2,750.00 6.88
5/14/2022 8921 30274 19,860.00 2,750.00 7.22
5/14/2022 8922 30303 12,290.00 2,750.00 4.47
5/14/2022 8923 30817 10,200.00 2,750.00 3.71
5/14/2022 8924 30296 19,190.00 2,750.00 6.98
5/14/2022 8925 30299 11,600.00 2,750.00 4.22
5/14/2022 8926 30275 17,520.00 2,750.00 6.37
5/14/2022 8927 30243 18,160.00 2,750.00 6.60
5/14/2022 8928 30358 23,650.00 2,750.00 8.60
5/14/2022 8929 30133 11,040.00 2,750.00 4.01
5/14/2022 8930 30365 16,040.00 2,750.00 5.83
5/14/2022 8931 30386 9,020.00 2,750.00 3.28
5/14/2022 8932 30364 19,790.00 2,750.00 7.20
5/14/2022 8933 30445 18,570.00 2,750.00 6.75
5/14/2022 8934 30303 15,680.00 2,750.00 5.70
5/14/2022 8935 30296 13,490.00 2,750.00 4.91
5/14/2022 8936 30297 17,100.00 2,750.00 6.22
5/14/2022 8937 30243 14,420.00 2,750.00 5.24
5/14/2022 8938 30360 17,080.00 2,750.00 6.21
5/14/2022 8939 30299 15,940.00 2,750.00 5.80
5/14/2022 8940 30358 17,410.00 2,750.00 6.33
5/14/2022 8941 30133 10,260.00 2,750.00 3.73
5/14/2022 8942 30275 16,090.00 2,750.00 5.85
5/14/2022 8943 30303 14,180.00 2,750.00 5.16
5/14/2022 8944 30364 15,230.00 2,750.00 5.54
5/14/2022 8945 30365 16,700.00 2,750.00 6.07
5/14/2022 8946 30386 11,130.00 2,750.00 4.05
5/14/2022 8947 30445 14,850.00 2,750.00 5.40
5/14/2022 8948 30243 16,860.00 2,750.00 6.13
5/14/2022 8949 30297 17,780.00 2,750.00 6.47
5/14/2022 8950 30360 13,720.00 2,750.00 4.99
5/14/2022 8951 30358 19,650.00 2,750.00 7.15
5/14/2022 8952 30133 6,890.00 2,750.00 2.51
5/14/2022 8953 30365 14,160.00 2,750.00 5.15
5/14/2022 8954 30445 19,040.00 2,750.00 6.92
5/14/2022 8955 30364 17,800.00 2,750.00 6.47
5/14/2022 8956 30386 11,180.00 2,750.00 4.07
5/14/2022 8957 30243 19,150.00 2,750.00 6.96
5/14/2022 8958 30297 20,210.00 2,750.00 7.35
5/14/2022 8959 30164 8,790.00 2,750.00 3.20
5/14/2022 8960 30360 18,270.00 2,750.00 6.64
TOTALES 424.99
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100 CAMIÒN VACIO
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
1.00 Bolon
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
5/15/2022 8961 30365 15,750.00 2,750.00 5.73
5/15/2022 8962 30358 20,800.00 2,750.00 7.56
5/15/2022 8963 30133 11,000.00 2,750.00 4.00
5/15/2022 8964 30274 17,630.00 2,750.00 6.41
5/15/2022 8965 30386 13,900.00 2,750.00 5.05
5/15/2022 8966 30273 17,020.00 2,750.00 6.19
5/15/2022 8967 30364 17,560.00 2,750.00 6.39
5/15/2022 8968 30360 24,650.00 2,750.00 8.96
5/15/2022 8969 30445 15,420.00 2,750.00 5.61
5/15/2022 8970 30299 13,950.00 2,750.00 5.07
5/15/2022 8971 30243 20,760.00 2,750.00 7.55
5/15/2022 8972 30297 21,490.00 2,750.00 7.81
5/15/2022 8973 30303 13,290.00 2,750.00 4.83
5/15/2022 8974 30365 15,680.00 2,750.00 5.70
5/15/2022 8975 30358 19,780.00 2,750.00 7.19
5/15/2022 8976 30300 17,000.00 2,750.00 6.18
5/15/2022 8977 30360 19,720.00 2,750.00 7.17
5/15/2022 8978 30133 11,800.00 2,750.00 4.29
5/15/2022 8979 30445 17,230.00 2,750.00 6.27
5/15/2022 8980 30275 15,360.00 2,750.00 5.59
5/15/2022 8981 30297 19,430.00 2,750.00 7.07
5/15/2022 8982 30386 10,860.00 2,750.00 3.95
5/15/2022 8983 30296 18,970.00 2,750.00 6.90
5/15/2022 8984 30273 17,690.00 2,750.00 6.43
5/15/2022 8985 30299 17,180.00 2,750.00 6.25
5/15/2022 8986 30243 15,790.00 2,750.00 5.74
5/15/2022 8987 30303 16,770.00 2,750.00 6.10
5/15/2022 8988 30364 20,950.00 2,750.00 7.62
5/15/2022 8989 30300 15,180.00 2,750.00 5.52
5/15/2022 8990 30365 18,580.00 2,750.00 6.76
5/15/2022 8991 30275 14,190.00 2,750.00 5.16
5/15/2022 8992 30297 20,750.00 2,750.00 7.55
5/15/2022 8993 30445 16,530.00 2,750.00 6.01
5/15/2022 8994 30386 11,420.00 2,750.00 4.15
5/15/2022 8995 30358 21,700.00 2,750.00 7.89
5/15/2022 8996 30296 21,770.00 2,750.00 7.92
5/15/2022 8997 30364 20,210.00 2,750.00 7.35
5/15/2022 8998 30300 18,390.00 2,750.00 6.69
5/15/2022 8999 30303 17,290.00 2,750.00 6.29
5/15/2022 9000 30365 19,910.00 2,750.00 7.24
5/15/2022 9001 30275 16,970.00 2,750.00 6.17
5/15/2022 9002 30273 24,880.00 2,750.00 9.05
5/15/2022 9003 30386 15,670.00 2,750.00 5.70
5/15/2022 9004 30445 13,970.00 2,750.00 5.08
5/15/2022 9005 30299 19,300.00 2,750.00 7.02
5/15/2022 9006 30358 21,480.00 2,750.00 7.81
5/15/2022 9007 30243 17,970.00 2,750.00 6.53
5/15/2022 9008 30296 24,420.00 2,750.00 8.88
5/15/2022 9009 30360 20,190.00 2,750.00 7.34
5/15/2022 9010 30133 11,220.00 2,750.00 4.08
5/15/2022 9011 30365 18,840.00 2,750.00 6.85
5/15/2022 9012 30273 16,940.00 2,750.00 6.16
5/15/2022 9013 30300 18,170.00 2,750.00 6.61
5/15/2022 9014 30297 17,470.00 2,750.00 6.35
5/15/2022 9015 30303 15,840.00 2,750.00 5.76
5/15/2022 9016 30364 19,510.00 2,750.00 7.09
5/15/2022 9017 30275 16,160.00 2,750.00 5.88
TOTALES 1,002,350.00 364.49
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100 CAMIÒN VACIO
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
57.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3)
(kg/m3)
5/16/2022 9018 30303 17,170.00 2,750.00 6.24
5/16/2022 9019 30358 18,860.00 2,750.00 6.86
5/16/2022 9020 30275 18,260.00 2,750.00 6.64
5/16/2022 9021 30243 18,370.00 2,750.00 6.68
5/16/2022 9022 30273 18,290.00 2,750.00 6.65
5/16/2022 9023 30360 20,840.00 2,750.00 7.58
5/16/2022 9024 30445 19,220.00 2,750.00 6.99
5/16/2022 9025 30297 18,060.00 2,750.00 6.57
5/16/2022 9026 30296 17,330.00 2,750.00 6.30
5/16/2022 9027 30274 20,090.00 2,750.00 7.31
5/16/2022 9028 30303 16,670.00 2,750.00 6.06
5/16/2022 9029 30275 19,370.00 2,750.00 7.04
5/16/2022 9030 30243 21,010.00 2,750.00 7.64
5/16/2022 9031 30299 16,190.00 2,750.00 5.89
5/16/2022 9032 30273 18,430.00 2,750.00 6.70
5/16/2022 9033 30296 19,520.00 2,750.00 7.10
5/16/2022 9034 30274 17,340.00 2,750.00 6.31
5/16/2022 9035 30297 18,660.00 2,750.00 6.79
5/16/2022 9036 30303 16,810.00 2,750.00 6.11
5/16/2022 9037 30275 15,090.00 2,750.00 5.49
5/16/2022 9038 30358 20,420.00 2,750.00 7.43
5/16/2022 9039 30243 19,730.00 2,750.00 7.17
5/16/2022 9040 30296 17,500.00 2,750.00 6.36
5/16/2022 9041 30273 17,040.00 2,750.00 6.20
5/16/2022 9042 30299 21,990.00 2,750.00 8.00
5/16/2022 9043 30274 20,020.00 2,750.00 7.28
5/16/2022 9044 30303 16,210.00 2,750.00 5.89
5/16/2022 9045 30297 19,080.00 2,750.00 6.94
5/16/2022 9046 30275 13,100.00 2,750.00 4.76
5/16/2022 9047 30358 17,140.00 2,750.00 6.23
5/16/2022 9048 30296 17,950.00 2,750.00 6.53
5/16/2022 9049 30273 17,280.00 2,750.00 6.28
5/16/2022 9050 30364 17,090.00 2,750.00 6.21
5/16/2022 9051 30164 10,190.00 2,750.00 3.71
5/16/2022 9052 30445 13,860.00 2,750.00 5.04
5/16/2022 9053 30360 17,960.00 2,750.00 6.53
5/16/2022 9054 30243 20,590.00 2,750.00 7.49
5/16/2022 9055 30297 18,460.00 2,750.00 6.71
5/16/2022 9056 30807 14,950.00 2,750.00 5.44
5/16/2022 9057 30299 20,900.00 2,750.00 7.60
5/16/2022 9058 30303 16,590.00 2,750.00 6.03
5/16/2022 9059 30275 16,410.00 2,750.00 5.97
5/16/2022 9060 30274 21,260.00 2,750.00 7.73
5/16/2022 9061 30358 21,490.00 2,750.00 7.81
5/16/2022 9062 30365 16,400.00 2,750.00 5.96
5/16/2022 9063 30296 20,450.00 2,750.00 7.44
5/16/2022 9064 30273 17,390.00 2,750.00 6.32
5/16/2022 9065 30445 19,160.00 2,750.00 6.97
5/16/2022 9066 30360 20,780.00 2,750.00 7.56
5/16/2022 9067 30448 13,540.00 2,750.00 4.92
5/16/2022 9068 30243 18,110.00 2,750.00 6.59
5/16/2022 9069 302977 19,190.00 2,750.00 6.98
5/16/2022 9070 30303 16,290.00 2,750.00 5.92
5/16/2022 9071 30807 15,200.00 2,750.00 5.53
5/16/2022 9072 30274 20,630.00 2,750.00 7.50
5/16/2022 9073 30364 16,630.00 2,750.00 6.05
5/16/2022 9074 30275 13,700.00 2,750.00 4.98
5/16/2022 9075 30358 22,020.00 2,750.00 8.01
5/16/2022 9076 30365 18,880.00 2,750.00 6.87
5/16/2022 9077 30164 12,030.00 2,750.00 4.37
5/16/2022 9078 30296 16,200.00 2,750.00 5.89
5/16/2022 9079 30273 20,270.00 2,750.00 7.37
5/16/2022 9080 30448 16,510.00 2,750.00 6.00
5/16/2022 9081 30365 18,200.00 2,750.00 6.62
5/16/2022 9082 30360 14,240.00 2,750.00 5.18
5/16/2022 9083 30243 18,160.00 2,750.00 6.60
5/16/2022 9084 30445 19,400.00 2,750.00 7.05
5/16/2022 9085 30807 11,200.00 2,750.00 4.07
5/16/2022 9086 30303 13,960.00 2,750.00 5.08
5/16/2022 9087 30297 19,690.00 2,750.00 7.16
5/16/2022 9088 30274 18,960.00 2,750.00 6.89
5/16/2022 9089 30364 17,320.00 2,750.00 6.30
5/16/2022 9090 30358 22,470.00 2,750.00 8.17
5/16/2022 9091 30448 17,980.00 2,750.00 6.54
5/16/2022 9092 30299 17,770.00 2,750.00 6.46
5/16/2022 9093 30275 17,100.00 2,750.00 6.22
5/16/2022 9094 30164 12,080.00 2,750.00 4.39
5/16/2022 9095 30296 18,100.00 2,750.00 6.58
5/16/2022 9096 30273 14,440.00 2,750.00 5.25
TOTALES 1,397,240.00 217,250.00 508.09
sa – Puerto Cabezas (85.65km)”

aplén t=0.90

Viajes Material Estac. Destino

1.00 Bolon 53+900


1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+201
1.00 Bolon 54+202
1.00 Bolon 54+203
1.00 Bolon 54+204
1.00 Bolon 54+205
1.00 Bolon 54+206
1.00 Bolon 54+207
1.00 Bolon 54+208
1.00 Bolon 54+209
1.00 Bolon 54+210
1.00 Bolon 54+211
1.00 Bolon 54+212
1.00 Bolon 54+213
1.00 Bolon 54+214
1.00 Bolon 54+215
1.00 Bolon 54+216
1.00 Bolon 54+217
1.00 Bolon 54+218
1.00 Bolon 54+219
1.00 Bolon 54+220
1.00 Bolon 54+221
1.00 Bolon 54+222
79.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
5/17/2022 9097 30-364 17,560.00 2,750.00 6.39
5/17/2022 9098 30-365 15,180.00 2,750.00 5.52
5/17/2022 9099 30-299 15,950.00 2,750.00 5.80
5/17/2022 9100 30-303 14,410.00 2,750.00 5.24
5/17/2022 9101 30-275 21,840.00 2,750.00 7.94
5/17/2022 9102 30-807 18,540.00 2,750.00 6.74
5/17/2022 9103 30-364 19,510.00 2,750.00 7.09
5/17/2022 9104 30-273 21,780.00 2,750.00 7.92
5/17/2022 9105 30-296 19,750.00 2,750.00 7.18
5/17/2022 9106 30-274 18,750.00 2,750.00 6.82
5/17/2022 9107 30-445 14,740.00 2,750.00 5.36
5/17/2022 9108 30-360 18,790.00 2,750.00 6.83
5/17/2022 9109 30-358 20,840.00 2,750.00 7.58
5/17/2022 9110 30-164 13,040.00 2,750.00 4.74
5/17/2022 9111 30-448 16,530.00 2,750.00 6.01
5/17/2022 9112 30-243 16,540.00 2,750.00 6.01
5/17/2022 9113 30-294 19,800.00 2,750.00 7.20
5/17/2022 9114 30-807 18,260.00 2,750.00 6.64
5/17/2022 9115 30-297 16,020.00 2,750.00 5.83
5/17/2022 9116 30-133 14,210.00 2,750.00 5.17
5/17/2022 9117 30-274 14,980.00 2,750.00 5.45
5/17/2022 9118 30-299 14,840.00 2,750.00 5.40
5/17/2022 9119 30-303 17,580.00 2,750.00 6.39
5/17/2022 9120 30-164 12,730.00 2,750.00 4.63
5/17/2022 9121 30-358 23,970.00 2,750.00 8.72
5/17/2022 9122 30-365 18,890.00 2,750.00 6.87
5/17/2022 9123 30-448 24,810.00 2,750.00 9.02
5/17/2022 9124 30-296 19,620.00 2,750.00 7.13
5/17/2022 9125 30-273 17,890.00 2,750.00 6.51
5/17/2022 9126 30-243 22,500.00 2,750.00 8.18
5/17/2022 9127 30-294 19,480.00 2,750.00 7.08
5/17/2022 9128 30-807 14,180.00 2,750.00 5.16
5/17/2022 9129 30-297 15,250.00 2,750.00 5.55
5/17/2022 9130 30-133 15,340.00 2,750.00 5.58
5/17/2022 9131 30-364 17,640.00 2,750.00 6.41
5/17/2022 9132 30-164 10,480.00 2,750.00 3.81
5/17/2022 9133 30-817 11,960.00 2,750.00 4.35
5/17/2022 9134 30-274 22,750.00 2,750.00 8.27
5/17/2022 9135 30-360 19,380.00 2,750.00 7.05
5/17/2022 9136 30-299 14,050.00 2,750.00 5.11
5/17/2022 9137 30-303 17,790.00 2,750.00 6.47
5/17/2022 9138 30-358 22,730.00 2,750.00 8.27
5/17/2022 9139 30-365 21,320.00 2,750.00 7.75
5/17/2022 9140 30-243 23,620.00 2,750.00 8.59
5/17/2022 9141 30-296 17,860.00 2,750.00 6.49
5/17/2022 9142 30-807 15,670.00 2,750.00 5.70
5/17/2022 9143 30-443 19,160.00 2,750.00 6.97
5/17/2022 9144 30-173 15,210.00 2,750.00 5.53
5/17/2022 9145 30-273 19,640.00 2,750.00 7.14
5/17/2022 9146 30-274 25,320.00 2,750.00 9.21
5/17/2022 9147 30-297 19,670.00 2,750.00 7.15
5/17/2022 9148 30-364 20,630.00 2,750.00 7.50
5/17/2022 9149 30-303 19,000.00 2,750.00 6.91
5/17/2022 9150 30-360 14,590.00 2,750.00 5.31
5/17/2022 9151 30-299 17,880.00 2,750.00 6.50
5/17/2022 9152 30-817 12,790.00 2,750.00 4.65
5/17/2022 9153 30-562 17,610.00 2,750.00 6.40
5/17/2022 9154 30-133 13,930.00 2,750.00 5.07
5/17/2022 9155 30-448 13,400.00 2,750.00 4.87
5/17/2022 9156 30-296 21,440.00 2,750.00 7.80
5/17/2022 9157 30-358 19,340.00 2,750.00 7.03
5/17/2022 9158 30-807 11,260.00 2,750.00 4.09
5/17/2022 9159 30-365 17,960.00 2,750.00 6.53
5/17/2022 9160 30-164 12,150.00 2,750.00 4.42
5/17/2022 9161 30-443 15,560.00 2,750.00 5.66
5/17/2022 9162 30-386 14,130.00 2,750.00 5.14
5/17/2022 9163 30-299 22,120.00 2,750.00 8.04
5/17/2022 9164 30-817 13,280.00 2,750.00 4.83
5/17/2022 9165 30-807 15,860.00 2,750.00 5.77
5/17/2022 9166 30-296 17,590.00 2,750.00 6.40
5/17/2022 9167 30-275 21,720.00 2,750.00 7.90
5/17/2022 9168 30-365 17,080.00 2,750.00 6.21
5/17/2022 9169 30-303 16,030.00 2,750.00 5.83
5/17/2022 9170 30-358 20,440.00 2,750.00 7.43
5/17/2022 9171 30-294 16,200.00 2,750.00 5.89
5/17/2022 9172 30-273 16,860.00 2,750.00 6.13
5/17/2022 9173 30-386 14,790.00 2,750.00 5.38
5/17/2022 9174 30-443 16,100.00 2,750.00 5.85
5/17/2022 9175 30-243 15,810.00 2,750.00 5.75
5/17/2022 9176 30-297 21,970.00 2,750.00 7.99
5/17/2022 9177 30-364 21,860.00 2,750.00 7.95
5/17/2022 9178 30-274 20,150.00 2,750.00 7.33
5/17/2022 9179 30-299 16,010.00 2,750.00 5.82
5/17/2022 9180 30-133 13,390.00 2,750.00 4.87
5/17/2022 9181 30-438 16,130.00 2,750.00 5.87
5/17/2022 9182 30-296 15,610.00 2,750.00 5.68
5/17/2022 9183 30-275 16,520.00 2,750.00 6.01
5/17/2022 9184 30-360 18,430.00 2,750.00 6.70
5/17/2022 9185 30-817 16,890.00 2,750.00 6.14
5/17/2022 9186 30-807 15,890.00 2,750.00 5.78
5/17/2022 9187 30-294 13,550.00 2,750.00 4.93
5/17/2022 9188 30-303 14,540.00 2,750.00 5.29
5/17/2022 9189 30-448 14,890.00 2,750.00 5.41
5/17/2022 9190 30-358 19,160.00 2,750.00 6.97
5/17/2022 9191 30-243 18,060.00 2,750.00 6.57
5/17/2022 9192 30-443 13,570.00 2,750.00 4.93
5/17/2022 9193 30-365 15,640.00 2,750.00 5.69
5/17/2022 9194 30-297 21,230.00 2,750.00 7.72
5/17/2022 9195 30-365 15,620.00 2,750.00 5.68
5/17/2022 9196 30-386 15,990.00 2,750.00 5.81
5/17/2022 9197 30-807 14,570.00 2,750.00 5.30
5/17/2022 9198 30-274 20,160.00 2,750.00 7.33
5/17/2022 9199 30-133 11,400.00 2,750.00 4.15
5/17/2022 9200 30-296 15,140.00 2,750.00 5.51
5/17/2022 9201 30-275 20,690.00 2,750.00 7.52
5/17/2022 9202 30-817 12,310.00 2,750.00 4.48
5/17/2022 9203 30-299 16,530.00 2,750.00 6.01
5/17/2022 9204 30-438 15,920.00 2,750.00 5.79
5/17/2022 9205 30-360 20,410.00 2,750.00 7.42
5/17/2022 9206 30-294 14,440.00 2,750.00 5.25
5/17/2022 9207 30-448 15,610.00 2,750.00 5.68
TOTALES 1,916,180.00 305,250.00 696.79
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 53+900 30 - -36 30--36
1.00 Bolon 53+900 30 - -36 30--36
1.00 Bolon 53+901 30 - -29 30--29
1.00 Bolon 53+901 30 - -30 30--30
1.00 Bolon 53+902 30 - -27 30--27
1.00 Bolon 53+902 30 - -80 30--80
1.00 Bolon 53+903 30 - -36 30--36
1.00 Bolon 53+903 30 - -27 30--27
1.00 Bolon 53+904 30 - -29 30--29
1.00 Bolon 53+900 30 - -27 30--27
1.00 Bolon 53+900 30 - -44 30--44
1.00 Bolon 53+900 30 - -36 30--36
1.00 Bolon 53+900 30 - -35 30--35
1.00 Bolon 53+900 30 - -16 30--16
1.00 Bolon 53+900 30 - -44 30--44
1.00 Bolon 53+900 30 - -24 30--24
1.00 Bolon 54+100 30 - -29 30--29
1.00 Bolon 54+100 30 - -80 30--80
1.00 Bolon 54+100 30 - -29 30--29
1.00 Bolon 54+100 30 - -13 30--13
1.00 Bolon 54+100 30 - -27 30--27
1.00 Bolon 54+100 30 - -29 30--29
1.00 Bolon 54+100 30 - -30 30--30
1.00 Bolon 54+100 30 - -16 30--16
1.00 Bolon 54+100 30 - -35 30--35
1.00 Bolon 54+100 30 - -36 30--36
1.00 Bolon 54+100 30 - -44 30--44
1.00 Bolon 54+100 30 - -29 30--29
1.00 Bolon 54+100 30 - -27 30--27
1.00 Bolon 54+100 30 - -24 30--24
1.00 Bolon 54+100 30 - -29 30--29
1.00 Bolon 54+100 30 - -80 30--80
1.00 Bolon 54+100 30 - -29 30--29
1.00 Bolon 54+100 30 - -13 30--13
1.00 Bolon 54+100 30 - -36 30--36
1.00 Bolon 54+100 30 - -16 30--16
1.00 Bolon 54+100 30 - -81 30--81
1.00 Bolon 54+100 30 - -27 30--27
1.00 Bolon 54+100 30 - -36 30--36
1.00 Bolon 54+100 30 - -29 30--29
1.00 Bolon 54+100 30 - -30 30--30
1.00 Bolon 54+100 30 - -35 30--35
1.00 Bolon 54+200 30 - -36 30--36
1.00 Bolon 54+200 30 - -24 30--24
1.00 Bolon 54+200 30 - -29 30--29
1.00 Bolon 54+200 30 - -80 30--80
1.00 Bolon 54+200 30 - -44 30--44
1.00 Bolon 54+200 30 - -17 30--17
1.00 Bolon 54+200 30 - -27 30--27
1.00 Bolon 54+200 30 - -27 30--27
1.00 Bolon 54+200 30 - -29 30--29
1.00 Bolon 54+200 30 - -36 30--36
1.00 Bolon 54+200 30 - -30 30--30
1.00 Bolon 54+200 30 - -36 30--36
1.00 Bolon 54+200 30 - -29 30--29
1.00 Bolon 54+200 30 - -81 30--81
1.00 Bolon 54+200 30 - -56 30--56
1.00 Bolon 54+201 30 - -13 30--13
1.00 Bolon 54+202 30 - -44 30--44
1.00 Bolon 54+203 30 - -29 30--29
1.00 Bolon 54+204 30 - -35 30--35
1.00 Bolon 54+205 30 - -80 30--80
1.00 Bolon 54+206 30 - -36 30--36
1.00 Bolon 54+207 30 - -16 30--16
1.00 Bolon 54+208 30 - -44 30--44
1.00 Bolon 54+209 30 - -38 30--38
1.00 Bolon 54+210 30 - -29 30--29
1.00 Bolon 54+211 30 - -81 30--81
1.00 Bolon 54+212 30 - -80 30--80
1.00 Bolon 54+213 30 - -29 30--29
1.00 Bolon 54+214 30 - -27 30--27
1.00 Bolon 54+215 30 - -36 30--36
1.00 Bolon 54+216 30 - -30 30--30
1.00 Bolon 54+217 30 - -35 30--35
1.00 Bolon 54+218 30 - -29 30--29
1.00 Bolon 54+219 30 - -27 30--27
1.00 Bolon 54+220 30 - -38 30--38
1.00 Bolon 54+221 30 - -44 30--44
1.00 Bolon 54+222 30 - -24 30--24
1.00 Bolon 54+223 30 - -29 30--29
1.00 Bolon 54+224 30 - -36 30--36
1.00 Bolon 54+225 30 - -27 30--27
1.00 Bolon 54+226 30 - -29 30--29
1.00 Bolon 54+227 30 - -13 30--13
1.00 Bolon 54+228 30 - -43 30--43
1.00 Bolon 54+229 30 - -29 30--29
1.00 Bolon 54+230 30 - -27 30--27
1.00 Bolon 54+231 30 - -36 30--36
1.00 Bolon 54+232 30 - -81 30--81
1.00 Bolon 54+233 30 - -80 30--80
1.00 Bolon 54+234 30 - -29 30--29
1.00 Bolon 54+233 30 - -30 30--30
1.00 Bolon 54+234 30 - -44 30--44
1.00 Bolon 54+235 30 - -35 30--35
1.00 Bolon 54+236 30 - -24 30--24
1.00 Bolon 54+237 30 - -44 30--44
1.00 Bolon 54+238 30 - -36 30--36
1.00 Bolon 54+239 30 - -29 30--29
1.00 Bolon 54+240 30 - -36 30--36
1.00 Bolon 54+241 30 - -38 30--38
1.00 Bolon 54+242 30 - -80 30--80
1.00 Bolon 54+243 30 - -27 30--27
1.00 Bolon 54+244 30 - -13 30--13
1.00 Bolon 54+245 30 - -29 30--29
1.00 Bolon 54+246 30 - -27 30--27
1.00 Bolon 54+247 30 - -81 30--81
1.00 Bolon 54+248 30 - -29 30--29
1.00 Bolon 54+249 30 - -43 30--43
1.00 Bolon 54+250 30 - -36 30--36
1.00 Bolon 54+251 30 - -29 30--29
1.00 Bolon 54+252 30 - -44 30--44
111.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
5/18/2022 9208 30-365 17,130.00 2,750.00 6.23
5/18/2022 9209 30-448 14,320.00 2,750.00 5.21
5/18/2022 9210 30-817 10,940.00 2,750.00 3.98
5/18/2022 9211 30-303 14,840.00 2,750.00 5.40
5/18/2022 9212 30-294 14,960.00 2,750.00 5.44
5/18/2022 9213 30-299 18,530.00 2,750.00 6.74
5/18/2022 9214 30-445 15,240.00 2,750.00 5.54
5/18/2022 9215 30-360 19,470.00 2,750.00 7.08
5/18/2022 9216 30-275 18,250.00 2,750.00 6.64
5/18/2022 9217 30-273 17,400.00 2,750.00 6.33
5/18/2022 9218 30-296 16,010.00 2,750.00 5.82
5/18/2022 9219 30-386 16,280.00 2,750.00 5.92
5/18/2022 9220 30-443 13,620.00 2,750.00 4.95
5/18/2022 9221 30-807 10,730.00 2,750.00 3.90
5/18/2022 9222 30-297 19,410.00 2,750.00 7.06
5/18/2022 9223 30-274 19,430.00 2,750.00 7.07
5/18/2022 9224 30-438 15,630.00 2,750.00 5.68
5/18/2022 9225 30-243 19,120.00 2,750.00 6.95
5/18/2022 9226 30-106 12,930.00 2,750.00 4.70
5/18/2022 9227 30-358 17,120.00 2,750.00 6.23
5/18/2022 9228 30-303 18,140.00 2,750.00 6.60
5/18/2022 9229 30-365 17,820.00 2,750.00 6.48
5/18/2022 9230 30-448 14,740.00 2,750.00 5.36
5/18/2022 9231 30-817 11,820.00 2,750.00 4.30
5/18/2022 9232 30-294 18,690.00 2,750.00 6.80
5/18/2022 9233 30-299 16,860.00 2,750.00 6.13
5/18/2022 9234 30-275 18,870.00 2,750.00 6.86
5/18/2022 9235 30-297 18,150.00 2,750.00 6.60
5/18/2022 9236 30-296 17,320.00 2,750.00 6.30
5/18/2022 9237 30-386 12,730.00 2,750.00 4.63
5/18/2022 9238 30-273 20,850.00 2,750.00 7.58
5/18/2022 9239 30-274 20,900.00 2,750.00 7.60
5/18/2022 9240 30-445 17,240.00 2,750.00 6.27
5/18/2022 9241 30-360 17,850.00 2,750.00 6.49
5/18/2022 9242 30-445 12,550.00 2,750.00 4.56
5/18/2022 9243 30-438 13,590.00 2,750.00 4.94
5/18/2022 9244 - 2,750.00 0.00
5/18/2022 9245 30-106 12,600.00 2,750.00 4.58
5/18/2022 9246 30-358 17,620.00 2,750.00 6.41
5/18/2022 9247 30-807 15,160.00 2,750.00 5.51
5/18/2022 9248 30-448 18,040.00 2,750.00 6.56
5/18/2022 9249 30-243 16,260.00 2,750.00 5.91
5/18/2022 9250 30-303 13,360.00 2,750.00 4.86
5/18/2022 9251 30-297 18,300.00 2,750.00 6.65
5/18/2022 9252 30-294 13,890.00 2,750.00 5.05
5/18/2022 9253 30-365 20,570.00 2,750.00 7.48
5/18/2022 9254 30-817 11,280.00 2,750.00 4.10
5/18/2022 9255 30-275 16,060.00 2,750.00 5.84
5/18/2022 9256 30-297 21,060.00 2,750.00 7.66
5/18/2022 9257 30-303 13,390.00 2,750.00 4.87
5/18/2022 9258 30-243 18,320.00 2,750.00 6.66
5/18/2022 9259 30-294 19,160.00 2,750.00 6.97
5/18/2022 9260 30-365 17,160.00 2,750.00 6.24
5/18/2022 9261 30-364 18,130.00 2,750.00 6.59
5/18/2022 9262 30-296 15,730.00 2,750.00 5.72
5/18/2022 9263 30-817 13,090.00 2,750.00 4.76
5/18/2022 9264 30-448 14,390.00 2,750.00 5.23
5/18/2022 9265 30-350 21,130.00 2,750.00 7.68
5/18/2022 9266 30-807 14,860.00 2,750.00 5.40
5/18/2022 9267 30-294 188,810.00 2,750.00 68.66
5/18/2022 9268 30-445 19,250.00 2,750.00 7.00
5/18/2022 9269 30-275 17,000.00 2,750.00 6.18
5/18/2022 9270 30-360 20,120.00 2,750.00 7.32
5/18/2022 9271 30-303 18,290.00 2,750.00 6.65
5/18/2022 9272 30-273 16,730.00 2,750.00 6.08
5/18/2022 9273 30-299 18,220.00 2,750.00 6.63
5/18/2022 9274 30-438 15,660.00 2,750.00 5.69
5/18/2022 9275 30-365 20,500.00 2,750.00 7.45
5/18/2022 9276 30-106 16,020.00 2,750.00 5.83
5/18/2022 9277 30-297 22,980.00 2,750.00 8.36
5/18/2022 9278 30-274 21,840.00 2,750.00 7.94
5/18/2022 9279 30-243 19,250.00 2,750.00 7.00
5/18/2022 9280 30-443 18,000.00 2,750.00 6.55
5/18/2022 9281 30-296 16,980.00 2,750.00 6.17
5/18/2022 9282 30-364 20,860.00 2,750.00 7.59
5/18/2022 9283 30-810 15,950.00 2,750.00 5.80
5/18/2022 9284 30-96 12,400.00 2,750.00 4.51
5/18/2022 9285 30-448 17,130.00 2,750.00 6.23
5/18/2022 9286 30-807 18,590.00 2,750.00 6.76
5/18/2022 9287 30-275 18,060.00 2,750.00 6.57
5/18/2022 9288 30-303 15,550.00 2,750.00 5.65
5/18/2022 9289 30-358 17,050.00 2,750.00 6.20
5/18/2022 9290 30-273 21,300.00 2,750.00 7.75
5/18/2022 9291 30-365 15,110.00 2,750.00 5.49
5/18/2022 9292 30-299 15,320.00 2,750.00 5.57
5/18/2022 9293 30-445 19,080.00 2,750.00 6.94
5/18/2022 9294 30-360 17,920.00 2,750.00 6.52
5/18/2022 9295 30-297 17,560.00 2,750.00 6.39
5/18/2022 9296 30-296 20,030.00 2,750.00 7.28
5/18/2022 9297 30-438 13,390.00 2,750.00 4.87
5/18/2022 9298 30-358 30,200.00 2,750.00 10.98
5/18/2022 9299 30-448 13,650.00 2,750.00 4.96
5/18/2022 9300 30-364 18,910.00 2,750.00 6.88
5/18/2022 9301 30-443 16,600.00 2,750.00 6.04
5/18/2022 9302 30-365 16,360.00 2,750.00 5.95
5/18/2022 9303 30-358 2,750.00 0.00
5/18/2022 9304 30-807 16,480.00 2,750.00 5.99
5/18/2022 9305 30-274 19,000.00 2,750.00 6.91
5/18/2022 9306 30-275 20,460.00 2,750.00 7.44
5/18/2022 9307 30-303 16,480.00 2,750.00 5.99
5/18/2022 9308 30-294 17,200.00 2,750.00 6.25
5/18/2022 9309 30-297 20,830.00 2,750.00 7.57
5/18/2022 9310 30-296 37,830.00 2,750.00 13.76
5/18/2022 9311 30-299 14,330.00 2,750.00 5.21
5/18/2022 9312 30-445 15,810.00 2,750.00 5.75
5/18/2022 9313 30-360 21,410.00 2,750.00 7.79
5/18/2022 9314 30-438 14,250.00 2,750.00 5.18
5/18/2022 9315 30-448 14,780.00 2,750.00 5.37
5/18/2022 9316 30-364 19,820.00 2,750.00 7.21
TOTALES 2,018,390.00 299,750.00 733.96
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 53+900 30 - -36 30--36
1.00 Bolon 53+900 30 - -44 30--44
1.00 Bolon 53+901 30 - -81 30--81
1.00 Bolon 53+901 30 - -30 30--30
1.00 Bolon 53+902 30 - -29 30--29
1.00 Bolon 53+902 30 - -29 30--29
1.00 Bolon 53+903 30 - -44 30--44
1.00 Bolon 53+903 30 - -36 30--36
1.00 Bolon 53+904 30 - -27 30--27
1.00 Bolon 53+900 30 - -27 30--27
1.00 Bolon 53+900 30 - -29 30--29
1.00 Bolon 53+900 30 - -38 30--38
1.00 Bolon 53+900 30 - -44 30--44
1.00 Bolon 53+900 30 - -80 30--80
1.00 Bolon 53+900 30 - -29 30--29
1.00 Bolon 53+900 30 - -27 30--27
1.00 Bolon 54+100 30 - -43 30--43
1.00 Bolon 54+100 30 - -24 30--24
1.00 Bolon 54+100 30 - -10 30--10
1.00 Bolon 54+100 30 - -35 30--35
1.00 Bolon 54+100 30 - -30 30--30
1.00 Bolon 54+100 30 - -36 30--36
1.00 Bolon 54+100 30 - -44 30--44
1.00 Bolon 54+100 30 - -81 30--81
1.00 Bolon 54+100 30 - -29 30--29
1.00 Bolon 54+100 30 - -29 30--29
1.00 Bolon 54+100 30 - -27 30--27
1.00 Bolon 54+100 30 - -29 30--29
1.00 Bolon 54+100 30 - -29 30--29
1.00 Bolon 54+100 30 - -38 30--38
1.00 Bolon 54+100 30 - -27 30--27
1.00 Bolon 54+100 30 - -27 30--27
1.00 Bolon 54+100 30 - -44 30--44
1.00 Bolon 54+100 30 - -36 30--36
1.00 Bolon 54+100 30 - -44 30--44
1.00 Bolon 54+100 30 - -43 30--43
1.00 Bolon 54+100 - - --
1.00 Bolon 54+100 30 - -10 30--10
1.00 Bolon 54+100 30 - -35 30--35
1.00 Bolon 54+100 30 - -80 30--80
1.00 Bolon 54+100 30 - -44 30--44
1.00 Bolon 54+100 30 - -24 30--24
1.00 Bolon 54+200 30 - -30 30--30
1.00 Bolon 54+200 30 - -29 30--29
1.00 Bolon 54+200 30 - -29 30--29
1.00 Bolon 54+200 30 - -36 30--36
1.00 Bolon 54+200 30 - -81 30--81
1.00 Bolon 54+200 30 - -27 30--27
1.00 Bolon 54+200 30 - -29 30--29
1.00 Bolon 54+200 30 - -30 30--30
1.00 Bolon 54+200 30 - -24 30--24
1.00 Bolon 54+200 30 - -29 30--29
1.00 Bolon 54+200 30 - -36 30--36
1.00 Bolon 54+200 30 - -36 30--36
1.00 Bolon 54+200 30 - -29 30--29
1.00 Bolon 54+200 30 - -81 30--81
1.00 Bolon 54+200 30 - -44 30--44
1.00 Bolon 54+201 30 - -35 30--35
1.00 Bolon 54+202 30 - -80 30--80
1.00 Bolon 54+203 30 - -29 30--29
1.00 Bolon 54+204 30 - -44 30--44
1.00 Bolon 54+205 30 - -27 30--27
1.00 Bolon 54+206 30 - -36 30--36
1.00 Bolon 54+207 30 - -30 30--30
1.00 Bolon 54+208 30 - -27 30--27
1.00 Bolon 54+209 30 - -29 30--29
1.00 Bolon 54+210 30 - -43 30--43
1.00 Bolon 54+211 30 - -36 30--36
1.00 Bolon 54+212 30 - -10 30--10
1.00 Bolon 54+213 30 - -29 30--29
1.00 Bolon 54+214 30 - -27 30--27
1.00 Bolon 54+215 30 - -24 30--24
1.00 Bolon 54+216 30 - -44 30--44
1.00 Bolon 54+217 30 - -29 30--29
1.00 Bolon 54+218 30 - -36 30--36
1.00 Bolon 54+219 30 - -81 30--81
1.00 Bolon 54+220 30 - -96 30--96
1.00 Bolon 54+221 30 - -44 30--44
1.00 Bolon 54+222 30 - -80 30--80
1.00 Bolon 54+223 30 - -27 30--27
1.00 Bolon 54+224 30 - -30 30--30
1.00 Bolon 54+225 30 - -35 30--35
1.00 Bolon 54+226 30 - -27 30--27
1.00 Bolon 54+227 30 - -36 30--36
1.00 Bolon 54+228 30 - -29 30--29
1.00 Bolon 54+229 30 - -44 30--44
1.00 Bolon 54+230 30 - -36 30--36
1.00 Bolon 54+231 30 - -29 30--29
1.00 Bolon 54+232 30 - -29 30--29
1.00 Bolon 54+233 30 - -43 30--43
1.00 Bolon 54+234 30 - -35 30--35
1.00 Bolon 54+235 30 - -44 30--44
1.00 Bolon 54+236 30 - -36 30--36
1.00 Bolon 54+237 30 - -44 30--44
1.00 Bolon 54+238 30 - -36 30--36
1.00 Bolon 54+239 30 - -35 30--35
1.00 Bolon 54+240 30 - -80 30--80
1.00 Bolon 54+241 30 - -27 30--27
1.00 Bolon 54+242 30 - -27 30--27
1.00 Bolon 54+243 30 - -30 30--30
1.00 Bolon 54+244 30 - -29 30--29
1.00 Bolon 54+245 30 - -29 30--29
1.00 Bolon 54+246 30 - -29 30--29
1.00 Bolon 54+247 30 - -29 30--29
1.00 Bolon 54+248 30 - -44 30--44
1.00 Bolon 54+249 30 - -36 30--36
1.00 Bolon 54+250 30 - -43 30--43
1.00 Bolon 54+251 30 - -44 30--44
1.00 Bolon 54+252 30 - -36 30--36
109.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
5/19/2022 9317 30364 16,620.00 2,750.00 6.04
5/19/2022 9318 30365 14,660.00 2,750.00 5.33
5/19/2022 9319 30817 17,140.00 2,750.00 6.23
5/19/2022 9320 30303 20,570.00 2,750.00 7.48
5/19/2022 9321 30106 12,030.00 2,750.00 4.37
5/19/2022 9322 30448 16,810.00 2,750.00 6.11
5/19/2022 9323 30807 12,760.00 2,750.00 4.64
5/19/2022 9324 30445 18,220.00 2,750.00 6.63
5/19/2022 9325 30360 17,980.00 2,750.00 6.54
5/19/2022 9326 30164 12,550.00 2,750.00 4.56
5/19/2022 9327 30386 15,650.00 2,750.00 5.69
5/19/2022 9328 30443 15,260.00 2,750.00 5.55
5/19/2022 9329 30299 27,830.00 2,750.00 10.12
5/19/2022 9330 30275 18,230.00 2,750.00 6.63
5/19/2022 9331 30296 20,500.00 2,750.00 7.45
5/19/2022 9332 30273 21,570.00 2,750.00 7.84
5/19/2022 9333 30364 18,100.00 2,750.00 6.58
5/19/2022 9334 30438 15,440.00 2,750.00 5.61
5/19/2022 9335 30365 17,980.00 2,750.00 6.54
5/19/2022 9336 30817 19,370.00 2,750.00 7.04
5/19/2022 9337 30448 14,220.00 2,750.00 5.17
5/19/2022 9338 30173 14,780.00 2,750.00 5.37
5/19/2022 9339 30807 13,230.00 2,750.00 4.81
5/19/2022 9340 30106 14,130.00 2,750.00 5.14
5/19/2022 9341 30360 15,630.00 2,750.00 5.68
5/19/2022 9342 30164 13,310.00 2,750.00 4.84
5/19/2022 9343 30445 15,240.00 2,750.00 5.54
5/19/2022 9344 30275 18,270.00 2,750.00 6.64
5/19/2022 9345 30273 14,710.00 2,750.00 5.35
5/19/2022 9346 30296 18,350.00 2,750.00 6.67
5/19/2022 9347 30443 15,620.00 2,750.00 5.68
5/19/2022 9348 30297 21,690.00 2,750.00 7.89
5/19/2022 9349 30299 18,400.00 2,750.00 6.69
5/19/2022 9350 30303 16,530.00 2,750.00 6.01
5/19/2022 9351 30364 18,990.00 2,750.00 6.91
5/19/2022 9352 30365 14,640.00 2,750.00 5.32
5/19/2022 9353 30243 17,550.00 2,750.00 6.38
5/19/2022 9354 30448 13,470.00 2,750.00 4.90
5/19/2022 9355 30438 15,350.00 2,750.00 5.58
5/19/2022 9356 30817 11,810.00 2,750.00 4.29
5/19/2022 9357 30297 33,880.00 2,750.00 12.32
5/19/2022 9358 30386 15,780.00 2,750.00 5.74
5/19/2022 9359 30810 15,070.00 2,750.00 5.48
5/19/2022 9360 30275 20,260.00 2,750.00 7.37
5/19/2022 9361 30299 8,710.00 2,750.00 3.17
5/19/2022 9362 30273 19,710.00 2,750.00 7.17
5/19/2022 9363 30365 17,880.00 2,750.00 6.50
5/19/2022 9364 30303 16,900.00 2,750.00 6.15
5/19/2022 9365 30364 18,080.00 2,750.00 6.57
5/19/2022 9366 30296 17,100.00 2,750.00 6.22
5/19/2022 9367 30443 18,200.00 2,750.00 6.62
5/19/2022 9368 30448 15,240.00 2,750.00 5.54
5/19/2022 9369 30438 14,980.00 2,750.00 5.45
5/19/2022 9370 30243 13,590.00 2,750.00 4.94
5/19/2022 9371 30360 18,570.00 2,750.00 6.75
5/19/2022 9372 30164 10,730.00 2,750.00 3.90
5/19/2022 9373 30273 31,080.00 2,750.00 11.30
5/19/2022 9374 30106 14,570.00 2,750.00 5.30
5/19/2022 9375 30807 13,410.00 2,750.00 4.88
5/19/2022 9376 30275 16,720.00 2,750.00 6.08
5/19/2022 9377 30386 13,040.00 2,750.00 4.74
5/19/2022 9378 30445 15,310.00 2,750.00 5.57
5/19/2022 9379 30299 15,200.00 2,750.00 5.53
5/19/2022 9380 30360 19,000.00 2,750.00 6.91
5/19/2022 9381 30303 17,430.00 2,750.00 6.34
5/19/2022 9382 30296 17,260.00 2,750.00 6.28
5/19/2022 9383 30364 18,340.00 2,750.00 6.67
5/19/2022 9384 30817 6,850.00 2,750.00 2.49
5/19/2022 9385 30443 12,100.00 2,750.00 4.40
5/19/2022 9386 30365 17,550.00 2,750.00 6.38
5/19/2022 9387 30294 13,000.00 2,750.00 4.73
5/19/2022 9388 30438 13,900.00 2,750.00 5.05
5/19/2022 9389 30243 18,790.00 2,750.00 6.83
5/19/2022 9390 30153 17,350.00 2,750.00 6.31
5/19/2022 9391 30297 17,500.00 2,750.00 6.36
5/19/2022 9392 30373 13,080.00 2,750.00 4.76
5/19/2022 9393 30448 16,570.00 2,750.00 6.03
5/19/2022 9394 30810 12,160.00 2,750.00 4.42
5/19/2022 9395 30807 17,590.00 2,750.00 6.40
5/19/2022 9396 30386 12,680.00 2,750.00 4.61
5/19/2022 9397 30106 16,360.00 2,750.00 5.95
5/19/2022 9398 30275 18,520.00 2,750.00 6.73
5/19/2022 9399 30144 15,760.00 2,750.00 5.73
5/19/2022 9400 30125 16,300.00 2,750.00 5.93
5/19/2022 9401 30164 11,980.00 2,750.00 4.36
5/19/2022 9402 30113 11,140.00 2,750.00 4.05
5/19/2022 9403 3096 15,000.00 2,750.00 5.45
5/19/2022 9404 30299 18,540.00 2,750.00 6.74
5/19/2022 9405 30730 11,450.00 2,750.00 4.16
5/19/2022 9406 30445 17,840.00 2,750.00 6.49
5/19/2022 9407 30303 16,090.00 2,750.00 5.85
5/19/2022 9408 30273 19,080.00 2,750.00 6.94
5/19/2022 9409 30443 14,520.00 2,750.00 5.28
5/19/2022 9410 30296 15,360.00 2,750.00 5.59
5/19/2022 9411 30364 17,680.00 2,750.00 6.43
5/19/2022 9412 30448 19,190.00 2,750.00 6.98
5/19/2022 9413 2,750.00 0.00
5/19/2022 9414 2,750.00 0.00
5/19/2022 9415 30807 21,750.00 2,750.00 7.91
5/19/2022 9416 30294 15,580.00 2,750.00 5.67
5/19/2022 9417 30275 23,110.00 2,750.00 8.40
5/19/2022 9418 30297 19,650.00 2,750.00 7.15
5/19/2022 9419 30299 21,700.00 2,750.00 7.89
TOTALES 1,676,950.00 283,250.00 609.80
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+200
1.00 Bolon 54+201
1.00 Bolon 54+202
1.00 Bolon 54+203
1.00 Bolon 54+204
1.00 Bolon 54+205
1.00 Bolon 54+206
1.00 Bolon 54+207
1.00 Bolon 54+208
1.00 Bolon 54+209
1.00 Bolon 54+210
1.00 Bolon 54+211
1.00 Bolon 54+212
1.00 Bolon 54+213
1.00 Bolon 54+214
1.00 Bolon 54+215
1.00 Bolon 54+216
1.00 Bolon 54+217
1.00 Bolon 54+218
1.00 Bolon 54+219
1.00 Bolon 54+220
1.00 Bolon 54+221
1.00 Bolon 54+222
1.00 Bolon 54+223
1.00 Bolon 54+224
1.00 Bolon 54+225
1.00 Bolon 54+226
1.00 Bolon 54+227
1.00 Bolon 54+228
1.00 Bolon 54+229
1.00 Bolon 54+230
1.00 Bolon 54+231
1.00 Bolon 54+232
1.00 Bolon 54+233
1.00 Bolon 54+234
1.00 Bolon 54+235
1.00 Bolon 54+236
1.00 Bolon 54+237
1.00 Bolon 54+238
1.00 Bolon 54+239
1.00 Bolon 54+240
1.00 Bolon 54+241
1.00 Bolon 54+242
1.00 Bolon 54+243
1.00 Bolon 54+244
1.00 Bolon 54+245
1.00 Bolon 54+246
103.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
5/20/2022 9420 30365 18,000.00 2,750.00 6.55
5/20/2022 9421 30364 19,990.00 2,750.00 7.27
5/20/2022 9422 30303 16,490.00 2,750.00 6.00
5/20/2022 9423 30294 14,550.00 2,750.00 5.29
5/20/2022 9424 30299 17,470.00 2,750.00 6.35
5/20/2022 9425 30106 14,810.00 2,750.00 5.39
5/20/2022 9426 30386 15,810.00 2,750.00 5.75
5/20/2022 9427 30360 20,090.00 2,750.00 7.31
5/20/2022 9428 30445 17,740.00 2,750.00 6.45
5/20/2022 9429 30817 13,890.00 2,750.00 5.05
5/20/2022 9430 30807 16,750.00 2,750.00 6.09
5/20/2022 9431 30443 16,020.00 2,750.00 5.83
5/20/2022 9432 30438 16,180.00 2,750.00 5.88
5/20/2022 9433 30448 16,670.00 2,750.00 6.06
5/20/2022 9434 30365 18,880.00 2,750.00 6.87
5/20/2022 9435 30297 20,600.00 2,750.00 7.49
5/20/2022 9436 30243 18,490.00 2,750.00 6.72
5/20/2022 9437 30364 20,570.00 2,750.00 7.48
5/20/2022 9438 30274 19,570.00 2,750.00 7.12
5/20/2022 9439 30386 16,390.00 2,750.00 5.96
5/20/2022 9440 30303 18,160.00 2,750.00 6.60
5/20/2022 9441 30106 12,760.00 2,750.00 4.64
5/20/2022 9442 30294 16,650.00 2,750.00 6.05
5/20/2022 9443 30299 18,560.00 2,750.00 6.75
5/20/2022 9444 30807 15,390.00 2,750.00 5.60
5/20/2022 9445 30448 16,830.00 2,750.00 6.12
5/20/2022 9446 30297 23,670.00 2,750.00 8.61
5/20/2022 9447 30817 16,120.00 2,750.00 5.86
5/20/2022 9448 30438 14,210.00 2,750.00 5.17
5/20/2022 9449 30360 19,040.00 2,750.00 6.92
5/20/2022 9450 30443 17,710.00 2,750.00 6.44
5/20/2022 9451 30445 17,410.00 2,750.00 6.33
5/20/2022 9452 30243 23,270.00 2,750.00 8.46
TOTALES 578,740.00 90,750.00 210.45
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
33.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
5/21/2022 9453 30364 19,240.00 2,750.00 7.00
5/21/2022 9454 30817 17,780.00 2,750.00 6.47
5/21/2022 9455 30365 18,610.00 2,750.00 6.77
5/21/2022 9456 30386 15,250.00 2,750.00 5.55
5/21/2022 9457 30294 18,590.00 2,750.00 6.76
5/21/2022 9458 30448 16,750.00 2,750.00 6.09
5/21/2022 9459 30445 16,800.00 2,750.00 6.11
5/21/2022 9460 30360 15,770.00 2,750.00 5.73
5/21/2022 9461 30807 15,100.00 2,750.00 5.49
5/21/2022 9462 30243 18,320.00 2,750.00 6.66
5/21/2022 9463 30106 13,580.00 2,750.00 4.94
5/21/2022 9464 30274 19,270.00 2,750.00 7.01
5/21/2022 9465 30297 20,330.00 2,750.00 7.39
5/21/2022 9466 30358 22,820.00 2,750.00 8.30
5/21/2022 9467 30164 10,610.00 2,750.00 3.86
5/21/2022 9468 30273 18,810.00 2,750.00 6.84
5/21/2022 9469 30364 17,060.00 2,750.00 6.20
5/21/2022 9470 30358 20,310.00 2,750.00 7.39
5/21/2022 9471 30807 16,010.00 2,750.00 5.82
5/21/2022 9472 30274 21,870.00 2,750.00 7.95
5/21/2022 9473 30364 19,590.00 2,750.00 7.12
5/21/2022 9474 30273 20,710.00 2,750.00 7.53
5/21/2022 9475 30483 10,540.00 2,750.00 3.83
5/21/2022 9476 30296 17,520.00 2,750.00 6.37
5/21/2022 9477 30243 20,490.00 2,750.00 7.45
5/21/2022 9478 30365 16,650.00 2,750.00 6.05
5/21/2022 9479 30386 12,750.00 2,750.00 4.64
5/21/2022 9480 30303 20,020.00 2,750.00 7.28
5/21/2022 9481 30274 14,690.00 2,750.00 5.34
5/21/2022 9482 30294 16,220.00 2,750.00 5.90
5/21/2022 9483 30448 12,010.00 2,750.00 4.37
5/21/2022 9484 30445 12,950.00 2,750.00 4.71
5/21/2022 9485 30438 11,840.00 2,750.00 4.31
5/21/2022 9486 30273 19,540.00 2,750.00 7.11
5/21/2022 9487 30807 11,440.00 2,750.00 4.16
5/21/2022 9488 30275 16,230.00 2,750.00 5.90
5/21/2022 9489 30358 16,310.00 2,750.00 5.93
5/21/2022 9490 30106 10,280.00 2,750.00 3.74
5/21/2022 9491 30113 10,530.00 2,750.00 3.83
5/21/2022 9492 30373 15,050.00 2,750.00 5.47
5/21/2022 9493 30164 8,730.00 2,750.00 3.17
5/21/2022 9494 30365 17,800.00 2,750.00 6.47
5/21/2022 9495 30817 12,890.00 2,750.00 4.69
TOTALES 697,660.00 118,250.00 253.69
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
43.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
5/22/2022 9496 30817 14,030.00 2,750.00 5.10
5/22/2022 9497 30303 14,440.00 2,750.00 5.25
5/22/2022 9498 30296 17,240.00 2,750.00 6.27
5/22/2022 9499 30358 22,470.00 2,750.00 8.17
5/22/2022 9500 30810 15,110.00 2,750.00 5.49
5/22/2022 9501 30273 15,520.00 2,750.00 5.64
5/22/2022 9502 30243 17,260.00 2,750.00 6.28
5/22/2022 9503 30360 14,530.00 2,750.00 5.28
5/22/2022 9504 30807 14,920.00 2,750.00 5.43
5/22/2022 9505 30448 14,930.00 2,750.00 5.43
5/22/2022 9506 30365 16,280.00 2,750.00 5.92
5/22/2022 9507 30445 13,600.00 2,750.00 4.95
5/22/2022 9508 30294 16,740.00 2,750.00 6.09
5/22/2022 9509 30274 22,190.00 2,750.00 8.07
5/22/2022 9510 30386 10,100.00 2,750.00 3.67
5/22/2022 9511 30164 13,310.00 2,750.00 4.84
5/22/2022 9512 30275 20,310.00 2,750.00 7.39
5/22/2022 9513 30122 11,030.00 2,750.00 4.01
5/22/2022 9514 30438 13,060.00 2,750.00 4.75
5/22/2022 9515 30113 17,650.00 2,750.00 6.42
5/22/2022 9516 30106 12,500.00 2,750.00 4.55
5/22/2022 9517 30125 11,840.00 2,750.00 4.31
5/22/2022 9518 30483 10,830.00 2,750.00 3.94
5/22/2022 9519 30297 19,280.00 2,750.00 7.01
5/22/2022 9520 30817 14,080.00 2,750.00 5.12
5/22/2022 9521 30303 16,550.00 2,750.00 6.02
5/22/2022 9522 30296 19,430.00 2,750.00 7.07
5/22/2022 9523 3096 11,880.00 2,750.00 4.32
5/22/2022 9524 30810 12,690.00 2,750.00 4.61
5/22/2022 9525 30358 24,380.00 2,750.00 8.87
5/22/2022 9526 30274 17,020.00 2,750.00 6.19
5/22/2022 9527 30807 11,550.00 2,750.00 4.20
5/22/2022 9528 30273 17,910.00 2,750.00 6.51
5/22/2022 9529 30243 22,290.00 2,750.00 8.11
5/22/2022 9530 30300 17,110.00 2,750.00 6.22
5/22/2022 9531 30445 13,670.00 2,750.00 4.97
5/22/2022 9532 30448 13,210.00 2,750.00 4.80
5/22/2022 9533 30365 21,060.00 2,750.00 7.66
5/22/2022 9534 30275 17,880.00 2,750.00 6.50
5/22/2022 9535 30294 16,480.00 2,750.00 5.99
5/22/2022 9536 30438 18,070.00 2,750.00 6.57
5/22/2022 9537 30386 12,910.00 2,750.00 4.69
5/22/2022 9538 30164 12,780.00 2,750.00 4.65
5/22/2022 9539 30113 10,660.00 2,750.00 3.88
5/22/2022 9540 30122 11,040.00 2,750.00 4.01
5/22/2022 9541 30106 12,440.00 2,750.00 4.52
5/22/2022 9542 30817 12,490.00 2,750.00 4.54
5/22/2022 9543 30483 9,140.00 2,750.00 3.32
5/22/2022 9544 2,750.00 0.00
5/22/2022 9545 30810 14,950.00 2,750.00 5.44
5/22/2022 9546 30297 21,790.00 2,750.00 7.92
5/22/2022 9547 30296 17,350.00 2,750.00 6.31
5/22/2022 9548 30358 17,680.00 2,750.00 6.43
5/22/2022 9549 30303 16,790.00 2,750.00 6.11
5/22/2022 9550 30807 16,180.00 2,750.00 5.88
5/22/2022 9551 30443 16,800.00 2,750.00 6.11
5/22/2022 9552 30448 12,210.00 2,750.00 4.44
5/22/2022 9553 30274 20,910.00 2,750.00 7.60
5/22/2022 9554 30243 19,580.00 2,750.00 7.12
5/22/2022 9555 30300 14,540.00 2,750.00 5.29
5/22/2022 9556 30360 18,350.00 2,750.00 6.67
5/22/2022 9557 30445 14,640.00 2,750.00 5.32
5/22/2022 9558 30386 11,030.00 2,750.00 4.01
5/22/2022 9559 30817 14,280.00 2,750.00 5.19
5/22/2022 9560 30438 13,240.00 2,750.00 4.81
5/22/2022 9561 30483 13,660.00 2,750.00 4.97
5/22/2022 9562 30365 15,710.00 2,750.00 5.71
5/22/2022 9563 30106 12,010.00 2,750.00 4.37
5/22/2022 9564 30125 11,240.00 2,750.00 4.09
5/22/2022 9565 30297 24,150.00 2,750.00 8.78
5/22/2022 9566 30303 17,660.00 2,750.00 6.42
5/22/2022 9567 30358 16,640.00 2,750.00 6.05
5/22/2022 9568 30443 14,020.00 2,750.00 5.10
5/22/2022 9569 30296 17,470.00 2,750.00 6.35
5/22/2022 9570 30113 12,450.00 2,750.00 4.53
5/22/2022 9571 30807 12,450.00 2,750.00 4.53
5/22/2022 9572 30274 21,630.00 2,750.00 7.87
5/22/2022 9573 30300 16,570.00 2,750.00 6.03
5/22/2022 9574 30300 16,570.00 2,750.00 6.03
5/22/2022 9575 30275 16,500.00 2,750.00 6.00
5/22/2022 9576 30483 13,880.00 2,750.00 5.05
5/22/2022 9577 30438 9,900.00 2,750.00 3.60
5/22/2022 9578 30817 8,870.00 2,750.00 3.23
TOTALES 1,267,590.00 228,250.00 460.94
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
83.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
5/23/2022 9579 30373 12,570.00 2,750.00 4.57
5/23/2022 9580 30364 13,060.00 2,750.00 4.75
5/23/2022 9581 30807 13,090.00 2,750.00 4.76
5/23/2022 9582 30817 13,090.00 2,750.00 4.76
5/23/2022 9583 30303 18,750.00 2,750.00 6.82
5/23/2022 9584 30365 13,100.00 2,750.00 4.76
5/23/2022 9585 30386 12,550.00 2,750.00 4.56
5/23/2022 9586 30273 19,900.00 2,750.00 7.24
5/23/2022 9587 3096 10,350.00 2,750.00 3.76
5/23/2022 9588 30243 18,570.00 2,750.00 6.75
5/23/2022 9589 30360 16,530.00 2,750.00 6.01
5/23/2022 9590 30445 13,070.00 2,750.00 4.75
5/23/2022 9591 30299 17,420.00 2,750.00 6.33
5/23/2022 9592 30164 12,030.00 2,750.00 4.37
5/23/2022 9593 30443 15,380.00 2,750.00 5.59
5/23/2022 9594 30113 5,930.00 2,750.00 2.16
5/23/2022 9595 30106 14,450.00 2,750.00 5.25
5/23/2022 9596 30297 18,730.00 2,750.00 6.81
5/23/2022 9597 30807 15,030.00 2,750.00 5.47
5/23/2022 9598 30364 15,690.00 2,750.00 5.71
5/23/2022 9599 30274 17,790.00 2,750.00 6.47
5/23/2022 9600 30358 18,080.00 2,750.00 6.57
5/23/2022 9601 30438 12,480.00 2,750.00 4.54
5/23/2022 9602 30153 13,370.00 2,750.00 4.86
5/23/2022 9603 30386 13,060.00 2,750.00 4.75
5/23/2022 9604 30303 15,020.00 2,750.00 5.46
5/23/2022 9605 30817 10,020.00 2,750.00 3.64
5/23/2022 9606 30294 19,470.00 2,750.00 7.08
5/23/2022 9607 3096 13,870.00 2,750.00 5.04
5/23/2022 9608 30365 16,090.00 2,750.00 5.85
5/23/2022 9609 30360 17,460.00 2,750.00 6.35
5/23/2022 9610 30445 15,860.00 2,750.00 5.77
5/23/2022 9611 30443 16,980.00 2,750.00 6.17
5/23/2022 9612 30273 16,550.00 2,750.00 6.02
5/23/2022 9613 30164 12,120.00 2,750.00 4.41
5/23/2022 9614 30296 18,370.00 2,750.00 6.68
5/23/2022 9615 30113 9,080.00 2,750.00 3.30
5/23/2022 9616 30438 14,230.00 2,750.00 5.17
5/23/2022 9617 30297 20,300.00 2,750.00 7.38
5/23/2022 9618 30300 20,270.00 2,750.00 7.37
5/23/2022 9619 30299 18,050.00 2,750.00 6.56
5/23/2022 9620 30364 21,530.00 2,750.00 7.83
5/23/2022 9621 30358 15,670.00 2,750.00 5.70
5/23/2022 9622 30106 12,470.00 2,750.00 4.53
5/23/2022 9623 30386 15,390.00 2,750.00 5.60
5/23/2022 9624 30153 10,690.00 2,750.00 3.89
5/23/2022 9625 30243 21,470.00 2,750.00 7.81
5/23/2022 9626 30817 14,650.00 2,750.00 5.33
5/23/2022 9627 30113 8,610.00 2,750.00 3.13
5/23/2022 9628 30303 21,120.00 2,750.00 7.68
5/23/2022 9629 30445 130.00 2,750.00 0.05
5/23/2022 9630 30443 17,850.00 2,750.00 6.49
5/23/2022 9631 30299 19,380.00 2,750.00 7.05
5/23/2022 9632 30300 20,530.00 2,750.00 7.47
5/23/2022 9633 30273 18,170.00 2,750.00 6.61
5/23/2022 9634 30296 20,570.00 2,750.00 7.48
5/23/2022 9635 30360 1,190.00 2,750.00 0.43
5/23/2022 9636 30364 21,030.00 2,750.00 7.65
5/23/2022 9637 30297 17,990.00 2,750.00 6.54
5/23/2022 9638 30365 17,520.00 2,750.00 6.37
5/23/2022 9639 30438 13,240.00 2,750.00 4.81
5/23/2022 9640 30274 14,850.00 2,750.00 5.40
5/23/2022 9641 30358 16,150.00 2,750.00 5.87
5/23/2022 9642 30113 7,500.00 2,750.00 2.73
5/23/2022 9643 30294 16,470.00 2,750.00 5.99
5/23/2022 9644 30275 15,820.00 2,750.00 5.75
5/23/2022 9645 30817 16,080.00 2,750.00 5.85
5/23/2022 9646 30386 11,250.00 2,750.00 4.09
5/23/2022 9647 30443 16,060.00 2,750.00 5.84
5/23/2022 9648 30297 22,920.00 2,750.00 8.33
5/23/2022 9649 3096 11,450.00 2,750.00 4.16
5/23/2022 9650 30365 20,140.00 2,750.00 7.32
5/23/2022 9651 30303 15,530.00 2,750.00 5.65
5/23/2022 9652 30438 10,840.00 2,750.00 3.94
5/23/2022 9653 30243 18,540.00 2,750.00 6.74
5/23/2022 9654 30483 11,750.00 2,750.00 4.27
5/23/2022 9655 30273 21,950.00 2,750.00 7.98
5/23/2022 9656 30299 20,730.00 2,750.00 7.54
5/23/2022 9657 30300 17,970.00 2,750.00 6.53
5/23/2022 9658 30296 22,720.00 2,750.00 8.26
5/23/2022 9659 30122 12,690.00 2,750.00 4.61
5/23/2022 9660 30113 10,700.00 2,750.00 3.89
5/23/2022 9661 30335 16,140.00 2,750.00 5.87
5/23/2022 9662 30294 24,260.00 2,750.00 8.82
5/23/2022 9663 30358 20,830.00 2,750.00 7.57
5/23/2022 9664 30386 16,500.00 2,750.00 6.00
5/23/2022 9665 30275 20,400.00 2,750.00 7.42
5/23/2022 9666 30364 16,830.00 2,750.00 6.12
5/23/2022 9667 30360 18,320.00 2,750.00 6.66
5/23/2022 9668 30483 13,770.00 2,750.00 5.01
5/23/2022 9669 30122 14,080.00 2,750.00 5.12
5/23/2022 9670 30299 26,260.00 2,750.00 9.55
5/23/2022 9671 30335 13,690.00 2,750.00 4.98
5/23/2022 9672 30817 13,260.00 2,750.00 4.82
5/23/2022 9673 30386 16,430.00 2,750.00 5.97
5/23/2022 9674 30365 16,820.00 2,750.00 6.12
5/23/2022 9675 30443 16,290.00 2,750.00 5.92
5/23/2022 9676 30303 17,730.00 2,750.00 6.45
5/23/2022 9677 30358 21,670.00 2,750.00 7.88
5/23/2022 9678 30275 22,800.00 2,750.00 8.29
5/23/2022 9679 30296 19,910.00 2,750.00 7.24
5/23/2022 9680 30153 15,460.00 2,750.00 5.62
5/23/2022 9681 30113 9,320.00 2,750.00 3.39
5/23/2022 9682 30274 17,300.00 2,750.00 6.29
5/23/2022 9683 30294 19,950.00 2,750.00 7.25
5/23/2022 9684 30445 15,290.00 2,750.00 5.56
5/23/2022 9685 30300 19,640.00 2,750.00 7.14
5/23/2022 9686 3096 16,520.00 2,750.00 6.01
5/23/2022 9687 30360 22,870.00 2,750.00 8.32
5/23/2022 9688 30483 14,440.00 2,750.00 5.25
TOTALES 1,755,900.00 302,500.00 638.51
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
110.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3) Viajes Material Estac. Destino

4/1/2022 5590 30807 16,720.00 2,750.00 6.08 1.00 Bolon


4/1/2022 5591 30364 20,580.00 2,750.00 7.48 1.00 Bolon
4/1/2022 5592 30440 15,360.00 2,750.00 5.59 1.00 Bolon
4/1/2022 5593 30300 19,110.00 2,750.00 6.95 1.00 Bolon
4/1/2022 5594 30113 13,790.00 2,750.00 5.01 1.00 Bolon
4/1/2022 5595 30443 18,070.00 2,750.00 6.57 1.00 Bolon
4/1/2022 5596 30275 22,460.00 2,750.00 8.17 1.00 Bolon 52+070
4/1/2022 5597 30243 24,940.00 2,750.00 9.07 1.00 Bolon 52+070
4/1/2022 5598 30358 22,110.00 2,750.00 8.04 1.00 Bolon 52+300
4/1/2022 5599 30817 15,090.00 2,750.00 5.49 1.00 Bolon 52+300
4/1/2022 5600 30296 16,560.00 2,750.00 6.02 1.00 Bolon 52+300
4/1/2022 5601 30243 24,750.00 2,750.00 9.00 1.00 Bolon 52+300
4/1/2022 5602 30303 21,840.00 2,750.00 7.94 1.00 Bolon 52+300
4/1/2022 5603 30294 20,930.00 2,750.00 7.61 1.00 Bolon 52+300
4/1/2022 5604 30300 24,020.00 2,750.00 8.73 1.00 Bolon 52+300
4/1/2022 5605 30275 21,100.00 2,750.00 7.67 1.00 Bolon 52+300
4/1/2022 5606 30365 20,350.00 2,750.00 7.40 1.00 Bolon 52+300
4/1/2022 5607 30184 11,830.00 2,750.00 4.30 1.00 Bolon 52+300
4/1/2022 5608 30296 22,320.00 2,750.00 8.12 1.00 Bolon 52+300
4/1/2022 5609 30243 2,600.00 2,750.00 0.95 1.00 Bolon 52+300
4/1/2022 5610 30303 19,680.00 2,750.00 7.16 1.00 Bolon 52+300
4/1/2022 5611 0.00 2,750.00 0.00 1.00 Bolon 52+300
4/1/2022 5612 30294 20,910.00 2,750.00 7.60 1.00 Bolon 52+300
4/1/2022 5613 30275 19,400.00 2,750.00 7.05 1.00 Bolon 52+300
4/1/2022 5614 30365 19,640.00 2,750.00 7.14 1.00 Bolon 52+300
4/1/2022 5615 30300 18,200.00 2,750.00 6.62 1.00 Bolon 52+300
4/1/2022 5616 30303 15,720.00 2,750.00 5.72 1.00 Bolon 52+300
4/1/2022 5617 30300 18,940.00 2,750.00 6.89 1.00 Bolon 52+300
4/1/2022 5618 30243 20,870.00 2,750.00 7.59 1.00 Bolon 52+300
4/1/2022 5619 30296 20,170.00 2,750.00 7.33 1.00 Bolon 52+300
4/1/2022 5620 30303 16,210.00 2,750.00 5.89 1.00 Bolon 52+300
4/1/2022 5621 30294 22,160.00 2,750.00 8.06 1.00 Bolon 52+300
4/1/2022 5622 30243 19,550.00 2,750.00 7.11 1.00 Bolon 52+300
4/1/2022 5623 30273 21,640.00 2,750.00 7.87 1.00 Bolon 52+300
4/1/2022 5624 30358 20,380.00 2,750.00 7.41 1.00 Bolon 52+300
4/1/2022 5625 30303 19,240.00 2,750.00 7.00 1.00 Bolon 52+300
4/1/2022 5626 30300 17,920.00 2,750.00 6.52 1.00 Bolon 53+000
4/1/2022 5627 30296 19,500.00 2,750.00 7.09 1.00 Bolon 53+000
4/1/2022 5628 30294 22,820.00 2,750.00 8.30 1.00 Bolon 53+000
4/1/2022 5629 30243 20,990.00 2,750.00 7.63 1.00 Bolon 53+000
4/1/2022 5630 30273 20,940.00 2,750.00 7.61 1.00 Bolon 53+000
4/1/2022 5631 0.00 2,750.00 0.00 1.00 Bolon 53+000
4/2/2022 5632 30300 17,960.00 2,750.00 6.53 1.00 Bolon 53+000
4/2/2022 5633 30296 18,950.00 2,750.00 6.89 1.00 Bolon 53+000
4/2/2022 5634 30303 21,130.00 2,750.00 7.68 1.00 Bolon 53+000
4/2/2022 5635 30300 20,750.00 2,750.00 7.55 1.00 Bolon 53+000
4/2/2022 5636 30296 18,200.00 2,750.00 6.62 1.00 Bolon 53+000
4/2/2022 5637 30300 19,710.00 2,750.00 7.17 1.00 Bolon 53+000
4/2/2022 5638 30296 400.00 2,750.00 0.15 1.00 Bolon 53+000
4/2/2022 5639 30303 18,280.00 2,750.00 6.65 1.00 Bolon 53+000
4/2/2022 5640 30294 22,450.00 2,750.00 8.16 1.00 Bolon 53+000
4/2/2022 5641 30817 15,070.00 2,750.00 5.48 1.00 Bolon 53+000
4/2/2022 5642 30184 11,600.00 2,750.00 4.22 1.00 Bolon 53+000
4/2/2022 5643 30300 18,010.00 2,750.00 6.55 1.00 Bolon 53+000
4/2/2022 5644 30807 15,420.00 2,750.00 5.61 1.00 Bolon 53+000
4/2/2022 5645 30303 17,210.00 2,750.00 6.26 1.00 Bolon 53+000
4/2/2022 5646 30358 14,850.00 2,750.00 5.40 1.00 Bolon 53+000
4/2/2022 5647 30443 18,030.00 2,750.00 6.56 1.00 Bolon 53+000
4/2/2022 5648 30817 16,390.00 2,750.00 5.96 1.00 Bolon 53+000
4/2/2022 5649 30173 16,620.00 2,750.00 6.04 1.00 Bolon 53+000
4/2/2022 5650 30807 14,640.00 2,750.00 5.32 1.00 Bolon 53+000
4/2/2022 5651 30294 22,360.00 2,750.00 8.13 1.00 Bolon 53+000
4/2/2022 5652 30448 16,090.00 2,750.00 5.85 1.00 Bolon 53+000
4/2/2022 5653 30358 20,750.00 2,750.00 7.55 1.00 Bolon 53+000
4/2/2022 5654 30184 11,600.00 2,750.00 4.22 1.00 Bolon 53+000
4/2/2022 5655 30296 17,660.00 2,750.00 6.42 1.00 Bolon 53+000
4/2/2022 5656 30300 22,780.00 2,750.00 8.28 1.00 Bolon 53+000
4/2/2022 5657 30303 22,400.00 2,750.00 8.15 1.00 Bolon 53+000
4/2/2022 5658 30443 18,120.00 2,750.00 6.59 1.00 Bolon 53+000
4/2/2022 5659 30273 18,750.00 2,750.00 6.82 1.00 Bolon 53+000
4/2/2022 5660 30817 15,290.00 2,750.00 5.56 1.00 Bolon 53+000
4/2/2022 5661 30807 11,970.00 2,750.00 4.35 1.00 Bolon 53+000
4/2/2022 5662 30373 15,230.00 2,750.00 5.54 1.00 Bolon 53+000
4/2/2022 5663 30173 14,420.00 2,750.00 5.24 1.00 Bolon 53+000
4/2/2022 5664 30358 20,080.00 2,750.00 7.30 1.00 Bolon 53+000
4/2/2022 5665 30440 15,440.00 2,750.00 5.61 1.00 Bolon 53+000
4/2/2022 5666 30164 12,210.00 2,750.00 4.44 1.00 Bolon 53+000
4/2/2022 5667 0.00 2,750.00 0.00 1.00 Bolon 53+000
4/2/2022 5668 30360 21,290.00 2,750.00 7.74 1.00 Bolon 53+000
4/2/2022 5669 0.00 2,750.00 0.00 1.00 Bolon 53+000
4/2/2022 5670 30443 14,920.00 2,750.00 5.43 1.00 Bolon 53+000
4/2/2022 5671 30184 13,120.00 2,750.00 4.77 1.00 Bolon 53+000
4/2/2022 5672 30448 16,630.00 2,750.00 6.05 1.00 Bolon 53+000
4/2/2022 5673 30164 10,630.00 2,750.00 3.87 1.00 Bolon 53+000
4/2/2022 5674 30358 22,530.00 2,750.00 8.19 1.00 Bolon 53+000
4/2/2022 5675 30300 19,550.00 2,750.00 7.11 1.00 Bolon 53+000
4/2/2022 5676 30303 18,310.00 2,750.00 6.66 1.00 Bolon 53+000
4/2/2022 5677 30296 16,260.00 2,750.00 5.91 1.00 Bolon 53+000
4/2/2022 5678 30173 16,530.00 2,750.00 6.01 1.00 Bolon 53+000
4/2/2022 5679 30273 18,180.00 2,750.00 6.61 1.00 Bolon 53+000
4/3/2022 5680 30817 13,900.00 2,750.00 5.05 1.00 Bolon 53+000
4/3/2022 5681 30448 16,190.00 2,750.00 5.89 1.00 Bolon 53+000
4/3/2022 5682 30364 21,090.00 2,750.00 7.67 1.00 Bolon 53+000
4/3/2022 5683 30164 12,750.00 2,750.00 4.64 1.00 Bolon 53+000
4/3/2022 5684 30273 21,580.00 2,750.00 7.85 1.00 Bolon 53+000
4/3/2022 5685 30300 21,740.00 2,750.00 7.91 1.00 Bolon 53+000
4/3/2022 5686 30807 19,100.00 2,750.00 6.95 1.00 Bolon 53+000
4/3/2022 5687 30184 13,110.00 2,750.00 4.77 1.00 Bolon 53+000
4/3/2022 5688 30294 19,150.00 2,750.00 6.96 1.00 Bolon 53+000
4/3/2022 5689 30443 18,490.00 2,750.00 6.72 1.00 Bolon 53+000
4/3/2022 5690 30360 19,960.00 2,750.00 7.26 1.00 Bolon 53+000
4/3/2022 5691 30358 18,730.00 2,750.00 6.81 1.00 Bolon 53+000
4/3/2022 5692 30303 19,850.00 2,750.00 7.22 1.00 Bolon 53+000
4/3/2022 5693 30438 17,200.00 2,750.00 6.25 1.00 Bolon 53+000
4/3/2022 5694 30364 20,600.00 2,750.00 7.49 1.00 Bolon 53+000
4/3/2022 5695 30296 21,450.00 2,750.00 7.80 1.00 Bolon 53+000
4/3/2022 5696 30448 15,200.00 2,750.00 5.53 1.00 Bolon 53+000
4/3/2022 5697 30373 18,620.00 2,750.00 6.77 1.00 Bolon 53+000
4/3/2022 5698 30562 17,430.00 2,750.00 6.34 1.00 Bolon 53+000
4/3/2022 5699 30164 14,400.00 2,750.00 5.24 1.00 Bolon 53+000
4/3/2022 5700 30807 15,550.00 2,750.00 5.65 1.00 Bolon 53+000
4/3/2022 5701 30184 12,730.00 2,750.00 4.63 1.00 Bolon 53+000
4/3/2022 5702 30273 18,080.00 2,750.00 6.57 1.00 Bolon 53+000
4/3/2022 5703 30300 19,560.00 2,750.00 7.11 1.00 Bolon 53+000
4/3/2022 5704 30443 16,020.00 2,750.00 5.83 1.00 Bolon 53+000
4/3/2022 5705 30358 18,630.00 2,750.00 6.77 1.00 Bolon 53+000
4/3/2022 5706 30373 18,770.00 2,750.00 6.83 1.00 Bolon 53+000
4/3/2022 5707 30360 17,650.00 2,750.00 6.42 1.00 Bolon 53+000
4/3/2022 5708 30448 16,150.00 2,750.00 5.87 1.00 Bolon 53+000
4/3/2022 5709 30438 12,390.00 2,750.00 4.51 1.00 Bolon 53+000
4/3/2022 5710 30294 15,210.00 2,750.00 5.53 1.00 Bolon 53+001
4/3/2022 5711 30164 12,620.00 2,750.00 4.59 1.00 Bolon 53+002
4/3/2022 5712 0.00 2,750.00 0.00 1.00 Bolon 53+003
4/3/2022 5713 30303 18,180.00 2,750.00 6.61 1.00 Bolon 53+004
4/3/2022 5714 30807 11,310.00 2,750.00 4.11 1.00 Bolon 53+005
4/3/2022 5715 30807 13,410.00 2,750.00 4.88 1.00 Bolon 53+006
4/3/2022 5716 30275 20,130.00 2,750.00 7.32 1.00 Bolon 53+007
4/3/2022 5717 30296 15,890.00 2,750.00 5.78 1.00 Bolon 53+008
4/3/2022 5718 30273 16,900.00 2,750.00 6.15 1.00 Bolon 53+009
4/3/2022 5719 30373 16,300.00 2,750.00 5.93 1.00 Bolon 53+010
4/3/2022 5720 2,750.00 0.00 1.00 Bolon 53+011
4/3/2022 5721 30358 26,580.00 2,750.00 9.67 1.00 Bolon 53+012
4/3/2022 5722 30448 15,430.00 2,750.00 5.61 1.00 Bolon 53+013
4/3/2022 5723 30164 11,320.00 2,750.00 4.12 1.00 Bolon 53+014
4/3/2022 5724 30817 13,150.00 2,750.00 4.78 1.00 Bolon 53+015
4/3/2022 5725 30360 24,780.00 2,750.00 9.01 1.00 Bolon 53+016
4/3/2022 5726 30443 14,360.00 2,750.00 5.22 1.00 Bolon 53+017
4/3/2022 5727 30184 10,450.00 2,750.00 3.80 1.00 Bolon 53+018
4/3/2022 5728 30364 19,440.00 2,750.00 7.07 1.00 Bolon 53+019
4/3/2022 5729 30303 18,990.00 2,750.00 6.91 1.00 Bolon 53+020
4/3/2022 5730 30807 14,680.00 2,750.00 5.34 1.00 Bolon 53+021
4/3/2022 5731 30373 17,320.00 2,750.00 6.30 1.00 Bolon 53+022
4/3/2022 5732 30184 12,680.00 2,750.00 4.61 1.00 Bolon 53+023
4/3/2022 5733 30273 14,540.00 2,750.00 5.29 1.00 Bolon 53+024
4/3/2022 5734 30817 17,780.00 2,750.00 6.47 1.00 Bolon 53+025
4/3/2022 5735 30445 14,070.00 2,750.00 5.12 1.00 Bolon 53+026
4/3/2022 5736 30300 10,600.00 2,750.00 3.85 1.00 Bolon 53+027
4/3/2022 5737 30294 23,330.00 2,750.00 8.48 1.00 Bolon 53+028
4/3/2022 5738 30448 17,610.00 2,750.00 6.40 1.00 Bolon 53+029
4/3/2022 5739 30275 21,700.00 2,750.00 7.89 1.00 Bolon 53+030
4/3/2022 5740 30358 22,170.00 2,750.00 8.06 1.00 Bolon 53+031
4/3/2022 5741 30164 12,790.00 2,750.00 4.65 1.00 Bolon 53+032
4/3/2022 5742 30360 18,510.00 2,750.00 6.73 1.00 Bolon 53+033
4/3/2022 5743 30364 23,460.00 2,750.00 8.53 1.00 Bolon 53+034
4/3/2022 5744 3096 15,160.00 2,750.00 5.51 1.00 Bolon 53+035
4/3/2022 5745 30443 19,780.00 2,750.00 7.19 1.00 Bolon 53+036
4/3/2022 5746 2,750.00 0.00 1.00 Bolon 53+037
4/3/2022 5747 30184 10,610.00 2,750.00 3.86 1.00 Bolon 53+038
4/3/2022 5748 30807 17,720.00 2,750.00 6.44 1.00 Bolon 53+039
4/3/2022 5749 30373 1,820.00 2,750.00 0.66 1.00 Bolon 53+040
4/3/2022 5750 30300 23,260.00 2,750.00 8.46 1.00 Bolon 53+041
4/3/2022 5751 30296 20,070.00 2,750.00 7.30 1.00 Bolon 53+042
4/3/2022 5752 30303 19,990.00 2,750.00 7.27 1.00 Bolon 53+043
4/3/2022 5753 30273 20,400.00 2,750.00 7.42 1.00 Bolon 53+044
4/3/2022 5754 30294 21,260.00 2,750.00 7.73 1.00 Bolon 53+045
4/3/2022 5755 30448 17,430.00 2,750.00 6.34 1.00 Bolon 53+046
4/3/2022 5756 30817 17,980.00 2,750.00 6.54 1.00 Bolon 53+047
4/3/2022 5757 30275 22,670.00 2,750.00 8.24 1.00 Bolon 53+048
4/3/2022 5758 30164 13,460.00 2,750.00 4.89 1.00 Bolon 53+049
4/3/2022 5759 30358 23,710.00 2,750.00 8.62 1.00 Bolon 53+050
2,875,260.00 467,500.00 6.15 170.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3) Viajes Material Estac. Destino

3/16/2022 4835 30275 18,660.00 2,750.00 6.79 1.00 Bolon 52+070


3/16/2022 4836 30133 14,210.00 2,750.00 5.17 1.00 Bolon 52+070
3/16/2022 4837 30300 16,310.00 2,750.00 5.93 1.00 Bolon 52+300
3/16/2022 4838 30243 18,550.00 2,750.00 6.75 1.00 Bolon 52+300
3/16/2022 4839 30275 18,660.00 2,750.00 6.79 1.00 Bolon 52+300
3/16/2022 4840 30133 12,510.00 2,750.00 4.55 1.00 Bolon 52+300
3/16/2022 4841 30243 12,610.00 2,750.00 4.59 1.00 Bolon 52+070
3/16/2022 4842 30300 20,220.00 2,750.00 7.35 1.00 Bolon 52+070
3/16/2022 4843 30275 19,470.00 2,750.00 7.08 1.00 Bolon 52+300
3/16/2022 4844 30133 13,130.00 2,750.00 4.77 1.00 Bolon 52+300
3/16/2022 4845 30243 17,120.00 2,750.00 6.23 1.00 Bolon 52+300
3/16/2022 4846 30275 19,730.00 2,750.00 7.17 1.00 Bolon 52+300
3/16/2022 4847 30300 19,480.00 2,750.00 7.08 1.00 Bolon 52+300
3/17/2022 4848 30275 21,610.00 2,750.00 7.86 1.00 Bolon 52+300
3/17/2022 4849 30303 16,540.00 2,750.00 6.01 1.00 Bolon 52+300
3/17/2022 4850 30296 14,520.00 2,750.00 5.28 1.00 Bolon 52+300
3/17/2022 4851 30300 18,490.00 2,750.00 6.72 1.00 Bolon 52+300
3/17/2022 4852 30243 17,920.00 2,750.00 6.52 1.00 Bolon 52+300
3/17/2022 4853 30275 19,030.00 2,750.00 6.92 1.00 Bolon 52+300
3/17/2022 4854 30303 13,880.00 2,750.00 5.05 1.00 Bolon 52+300
3/17/2022 4855 30296 13,750.00 2,750.00 5.00 1.00 Bolon 52+300
3/17/2022 4856 30300 13,720.00 2,750.00 4.99 1.00 Bolon 52+300
3/17/2022 4857 30243 17,720.00 2,750.00 6.44 1.00 Bolon 52+300
3/17/2022 4858 30275 17,680.00 2,750.00 6.43 1.00 Bolon 52+300
3/17/2022 4859 30303 15,520.00 2,750.00 5.64 1.00 Bolon 52+300
3/17/2022 4860 30296 16,860.00 2,750.00 6.13 1.00 Bolon 52+300
3/17/2022 4861 30273 18,670.00 2,750.00 6.79 1.00 Bolon 52+300
3/17/2022 4862 0.00 2,750.00 0.00 1.00 Bolon 52+300
3/17/2022 4863 30300 19,830.00 2,750.00 7.21 1.00 Bolon 52+300
3/17/2022 4864 30243 17,920.00 2,750.00 6.52 1.00 Bolon 52+300
3/17/2022 4865 30303 19,700.00 2,750.00 7.16 1.00 Bolon 52+300
3/17/2022 4866 30275 1,990.00 2,750.00 0.72 1.00 Bolon 52+300
3/17/2022 4867 30296 15,480.00 2,750.00 5.63 1.00 Bolon 52+300
3/17/2022 4868 30366 18,310.00 2,750.00 6.66 1.00 Bolon 52+300
3/17/2022 4869 30365 15,440.00 2,750.00 5.61 1.00 Bolon 52+300
3/17/2022 4870 30300 16,430.00 2,750.00 5.97 1.00 Bolon 52+300
3/17/2022 4871 30303 19,160.00 2,750.00 6.97 1.00 Bolon 53+000
3/17/2022 4872 30243 23,680.00 2,750.00 8.61 1.00 Bolon 53+000
3/17/2022 4873 30296 21,690.00 2,750.00 7.89 1.00 Bolon 53+000
3/17/2022 4874 30273 18,200.00 2,750.00 6.62 1.00 Bolon 53+000
3/17/2022 4875 30275 19,550.00 2,750.00 7.11 1.00 Bolon 53+000
3/17/2022 4876 30365 18,600.00 2,750.00 6.76 1.00 Bolon 53+000
3/18/2022 4877 30296 13,800.00 2,750.00 5.02 1.00 Bolon 53+000
3/18/2022 4878 30303 14,240.00 2,750.00 5.18 1.00 Bolon 53+000
3/18/2022 4879 30273 16,350.00 2,750.00 5.95 1.00 Bolon 53+000
3/18/2022 4880 30243 18,580.00 2,750.00 6.76 1.00 Bolon 53+000
3/18/2022 4881 30275 15,710.00 2,750.00 5.71 1.00 Bolon 53+000
3/18/2022 4882 30296 18,150.00 2,750.00 6.60 1.00 Bolon 53+000
3/18/2022 4883 30303 17,230.00 2,750.00 6.27 1.00 Bolon 53+000
3/18/2022 4884 30273 16,740.00 2,750.00 6.09 1.00 Bolon 53+000
3/18/2022 4885 30243 17,260.00 2,750.00 6.28 1.00 Bolon 53+000
3/18/2022 4886 30275 16,320.00 2,750.00 5.93 1.00 Bolon 53+000
3/18/2022 4887 30365 16,770.00 2,750.00 6.10 1.00 Bolon 53+000
3/18/2022 4888 0.00 2,750.00 0.00 1.00 Bolon 53+000
3/18/2022 4889 0.00 2,750.00 0.00 1.00 Bolon 53+000
3/18/2022 4890 30275 19,420.00 2,750.00 7.06 1.00 Bolon 53+000
3/18/2022 4891 30296 16,430.00 2,750.00 5.97 1.00 Bolon 53+000
3/18/2022 4892 0.00 2,750.00 0.00 1.00 Bolon 53+000
3/18/2022 4893 30243 24,180.00 2,750.00 8.79 1.00 Bolon 53+000
3/18/2022 4894 30365 17,300.00 2,750.00 6.29 1.00 Bolon 53+000
3/18/2022 4895 30275 22,960.00 2,750.00 8.35 1.00 Bolon 53+000
3/18/2022 4896 30273 21,470.00 2,750.00 7.81 1.00 Bolon 53+000
3/18/2022 4897 30296 20,490.00 2,750.00 7.45 1.00 Bolon 53+000
3/18/2022 4898 30294 21,230.00 2,750.00 7.72 1.00 Bolon 53+000
3/18/2022 4899 30243 17,430.00 2,750.00 6.34 1.00 Bolon 53+000
3/18/2022 4900 30365 17,980.00 2,750.00 6.54 1.00 Bolon 53+000
3/18/2022 4901 30303 19,480.00 2,750.00 7.08 1.00 Bolon 53+000
3/18/2022 4902 30275 21,210.00 2,750.00 7.71 1.00 Bolon 53+000
3/18/2022 4903 30294 24,770.00 2,750.00 9.01 1.00 Bolon 53+000
3/18/2022 4904 30296 18,810.00 2,750.00 6.84 1.00 Bolon 53+000
3/18/2022 4905 30273 18,090.00 2,750.00 6.58 1.00 Bolon 53+000
3/18/2022 4906 30243 13,000.00 2,750.00 4.73 1.00 Bolon 53+000
3/18/2022 4907 30365 15,420.00 2,750.00 5.61 1.00 Bolon 53+000
3/19/2022 4908 30303 14,730.00 2,750.00 5.36 1.00 Bolon 53+000
3/19/2022 4909 30275 17,360.00 2,750.00 6.31 1.00 Bolon 53+000
3/19/2022 4910 30273 20,560.00 2,750.00 7.48 1.00 Bolon 53+000
3/19/2022 4911 30296 19,220.00 2,750.00 6.99 1.00 Bolon 53+000
3/19/2022 4912 30365 14,810.00 2,750.00 5.39 1.00 Bolon 53+000
3/19/2022 4913 30562 13,030.00 2,750.00 4.74 1.00 Bolon 53+000
3/19/2022 4914 30294 13,830.00 2,750.00 5.03 1.00 Bolon 53+000
3/19/2022 4915 30243 13,970.00 2,750.00 5.08 1.00 Bolon 53+000
3/19/2022 4916 30275 19,600.00 2,750.00 7.13 1.00 Bolon 53+000
3/19/2022 4917 30303 17,860.00 2,750.00 6.49 1.00 Bolon 53+000
3/19/2022 4918 30296 17,200.00 2,750.00 6.25 1.00 Bolon 53+000
3/19/2022 4919 30365 15,830.00 2,750.00 5.76 1.00 Bolon 53+000
3/19/2022 4920 30273 18,840.00 2,750.00 6.85 1.00 Bolon 53+000
3/19/2022 4921 30300 15,340.00 2,750.00 5.58 1.00 Bolon 53+000
3/19/2022 4922 30294 19,080.00 2,750.00 6.94 1.00 Bolon 53+000
3/19/2022 4923 30303 20,290.00 2,750.00 7.38 1.00 Bolon 53+000
3/19/2022 4924 30275 19,560.00 2,750.00 7.11 1.00 Bolon 53+000
3/19/2022 4925 30365 14,490.00 2,750.00 5.27 1.00 Bolon 53+000
3/19/2022 4926 30243 16,750.00 2,750.00 6.09 1.00 Bolon 53+000
3/19/2022 4927 30273 19,540.00 2,750.00 7.11 1.00 Bolon 53+000
3/19/2022 4928 30562 16,910.00 2,750.00 6.15 1.00 Bolon 53+000
3/19/2022 4929 30296 2,500.00 2,750.00 0.91 1.00 Bolon 53+000
3/19/2022 4930 30365 16,480.00 2,750.00 5.99 1.00 Bolon 53+000
3/19/2022 4931 30275 21,770.00 2,750.00 7.92 1.00 Bolon 53+000
3/19/2022 4932 30294 18,650.00 2,750.00 6.78 1.00 Bolon 53+000
3/19/2022 4933 30303 18,000.00 2,750.00 6.55 1.00 Bolon 53+000
3/19/2022 4934 30243 17,320.00 2,750.00 6.30 1.00 Bolon 53+000
3/19/2022 4935 0.00 2,750.00 0.00 1.00 Bolon 53+000
3/19/2022 4936 0.00 2,750.00 0.00 1.00 Bolon 53+000
3/19/2022 4937 30365 14,790.00 2,750.00 5.38 1.00 Bolon 53+000
3/19/2022 4938 30299 20,525.00 2,750.00 7.46 1.00 Bolon 53+000
3/19/2022 4939 30275 17,330.00 2,750.00 6.30 1.00 Bolon 53+000
3/19/2022 4940 30303 17,340.00 2,750.00 6.31 1.00 Bolon 53+000
3/19/2022 4941 30243 18,950.00 2,750.00 6.89 1.00 Bolon 53+000
3/19/2022 4942 30294 19,890.00 2,750.00 7.23 1.00 Bolon 53+000
3/19/2022 4943 30300 17,710.00 2,750.00 6.44 1.00 Bolon 53+000
3/19/2022 4944 30299 20,180.00 2,750.00 7.34 1.00 Bolon 53+000
3/19/2022 4945 30303 19,810.00 2,750.00 7.20 1.00 Bolon 53+000
3/19/2022 4946 30365 15,700.00 2,750.00 5.71 1.00 Bolon 53+000
3/19/2022 4947 30275 16,120.00 2,750.00 5.86 1.00 Bolon 53+000
3/19/2022 4948 30296 19,080.00 2,750.00 6.94 1.00 Bolon 53+000
3/19/2022 4949 30273 20,140.00 2,750.00 7.32 1.00 Bolon 53+000
3/19/2022 4950 30243 20,640.00 2,750.00 7.51 1.00 Bolon 53+000
3/20/2022 4951 30303 14,810.00 2,750.00 5.39 1.00 Bolon 53+000
3/20/2022 4952 30294 13,630.00 2,750.00 4.96 1.00 Bolon 53+000
3/20/2022 4953 30365 11,790.00 2,750.00 4.29 1.00 Bolon 53+000
3/20/2022 4954 30275 16,540.00 2,750.00 6.01 1.00 Bolon 53+000
3/20/2022 4955 30562 15,010.00 2,750.00 5.46 1.00 Bolon 53+001
3/20/2022 4956 30300 15,250.00 2,750.00 5.55 1.00 Bolon 53+002
3/20/2022 4957 30299.00 13,880.00 2,750.00 5.05 1.00 Bolon 53+003
3/20/2022 4958 30303 15,220.00 2,750.00 5.53 1.00 Bolon 53+004
3/20/2022 4959 30294 14,850.00 2,750.00 5.40 1.00 Bolon 53+005
3/20/2022 4960 30365 15,830.00 2,750.00 5.76 1.00 Bolon 53+006
3/20/2022 4961 30275 20,650.00 2,750.00 7.51 1.00 Bolon 53+007
3/20/2022 4962 30299 26,290.00 2,750.00 9.56 1.00 Bolon 53+008
3/20/2022 4963 30303 14,030.00 2,750.00 5.10 1.00 Bolon 53+009
3/20/2022 4964 30294 21,720.00 2,750.00 7.90 1.00 Bolon 53+010
3/20/2022 4965 30562 12,320.00 2,750.00 4.48 1.00 Bolon 53+011
3/20/2022 4966 30243 25,330.00 2,750.00 9.21 1.00 Bolon 53+012
3/20/2022 4967 30562 13,730.00 2,750.00 4.99 1.00 Bolon 53+013
3/20/2022 4968 30294 16,910.00 2,750.00 6.15 1.00 Bolon 53+014
3/21/2022 4969 30562 16,430.00 2,750.00 5.97 1.00 Bolon 53+015
3/21/2022 4970 30294 16,540.00 2,750.00 6.01 1.00 Bolon 53+016
3/21/2022 4971 30300 14,360.00 2,750.00 5.22 1.00 Bolon 53+017
3/21/2022 4972 30294 21,080.00 2,750.00 7.67 1.00 Bolon 53+018
3/21/2022 4973 30275 16,820.00 2,750.00 6.12 1.00 Bolon 53+019
3/21/2022 4974 0.00 2,750.00 0.00 1.00 Bolon 53+020
3/21/2022 4975 0.00 2,750.00 0.00 1.00 Bolon 53+021
3/21/2022 4976 30365 15,700.00 2,750.00 5.71 1.00 Bolon 53+022
3/21/2022 4977 30365 15,700.00 2,750.00 5.71 1.00 Bolon 53+023
3/21/2022 4978 30296 18,910.00 2,750.00 6.88 1.00 Bolon 53+024
3/21/2022 4979 30275 17,110.00 2,750.00 6.22 1.00 Bolon 53+025
3/21/2022 4980 30562 15,700.00 2,750.00 5.71 1.00 Bolon 53+026
3/21/2022 4981 30300 16,490.00 2,750.00 6.00 1.00 Bolon 53+027
3/21/2022 4982 30296 14,110.00 2,750.00 5.13 1.00 Bolon 53+028
3/21/2022 4983 30562 360.00 2,750.00 0.13 1.00 Bolon 53+029
3/21/2022 4984 30365 16,510.00 2,750.00 6.00 1.00 Bolon 53+030
3/21/2022 4985 30294 15,750.00 2,750.00 5.73 1.00 Bolon 53+031
3/21/2022 4986 30296 15,770.00 2,750.00 5.73 1.00 Bolon 53+032
3/21/2022 4987 30275 18,060.00 2,750.00 6.57 1.00 Bolon 53+033
3/21/2022 4988 30300 15,340.00 2,750.00 5.58 1.00 Bolon 53+034
3/21/2022 4989 15,160.00 2,750.00 5.51 1.00 Bolon 53+035
3/21/2022 4990 19,780.00 2,750.00 7.19 1.00 Bolon 53+036
3/21/2022 4991 2,750.00 0.00 1.00 Bolon 53+037
3/21/2022 4992 10,610.00 2,750.00 3.86 1.00 Bolon 53+038
3/21/2022 4993 17,720.00 2,750.00 6.44 1.00 Bolon 53+039
3/21/2022 4994 1,820.00 2,750.00 0.66 1.00 Bolon 53+040
3/21/2022 4995 23,260.00 2,750.00 8.46 1.00 Bolon 53+041
3/21/2022 4996 20,070.00 2,750.00 7.30 1.00 Bolon 53+042
3/21/2022 4997 19,990.00 2,750.00 7.27 1.00 Bolon 53+043
3/21/2022 4998 20,400.00 2,750.00 7.42 1.00 Bolon 53+044
3/21/2022 4999 21,260.00 2,750.00 7.73 1.00 Bolon 53+045
3/21/2022 5000 17,430.00 2,750.00 6.34 1.00 Bolon 53+046
3/21/2022 5001 17,980.00 2,750.00 6.54 1.00 Bolon 53+047
3/21/2022 5002 22,670.00 2,750.00 8.24 1.00 Bolon 53+048
3/21/2022 5003 13,460.00 2,750.00 4.89 1.00 Bolon 53+049
3/21/2022 5004 23,710.00 2,750.00 8.62 1.00 Bolon 53+050
2,768,945.00 467,500.00 1,006.89 170.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
6/28/2021 745 30302 4,410.00 2,750.00 1.60
6/28/2021 746 30365 5,690.00 2,750.00 2.07
6/28/2021 747 2,750.00 0.00
6/28/2021 748 2,750.00 0.00
6/29/2021 749 30358 18,940.00 2,750.00 6.89
6/29/2021 750 30274 11,160.00 2,750.00 4.06
6/29/2021 751 30275 19,110.00 2,750.00 6.95
6/29/2021 752 30133 10,600.00 2,750.00 3.85
6/28/2021 718 30299 29,470.00 2,750.00 10.72
6/28/2021 719 30302 34,460.00 2,750.00 12.53
6/28/2021 720 30274 15,620.00 2,750.00 5.68
6/28/2021 721 30358 24,190.00 2,750.00 8.80
6/28/2021 722 30133 3,000.00 2,750.00 1.09
6/28/2021 723 30365 31,710.00 2,750.00 11.53
6/28/2021 724 30302 24,190.00 2,750.00 8.80
6/28/2021 725 30299 40,610.00 2,750.00 14.77
6/28/2021 726 30133 11,470.00 2,750.00 4.17
6/28/2021 727 30274 47,500.00 2,750.00 17.27
6/28/2021 728 30365 9,780.00 2,750.00 3.56
6/28/2021 729 30299 15,830.00 2,750.00 5.76
6/28/2021 730 30299 40,340.00 2,750.00 14.67
6/28/2021 731 30274 13,930.00 2,750.00 5.07
6/28/2021 732 2,750.00 0.00
6/28/2021 733 30358 17,970.00 2,750.00 6.53
6/28/2021 734 30133 7,540.00 2,750.00 2.74
6/28/2021 735 30300 4,810.00 2,750.00 1.75
6/28/2021 736 30365 7,050.00 2,750.00 2.56
6/28/2021 737 30302 12,480.00 2,750.00 4.54
6/28/2021 738 30358 16,130.00 2,750.00 5.87
6/28/2021 739 30274 11,740.00 2,750.00 4.27
6/28/2021 740 30299 14,140.00 2,750.00 5.14
6/28/2021 741 30296 1,120.00 2,750.00 0.41
6/28/2021 742 30294 1,320.00 2,750.00 0.48
6/28/2021 743 30275 1,660.00 2,750.00 0.60
6/28/2021 744 30133 4,270.00 2,750.00 1.55
6/24/2021 700 30300 102,730.00 2,750.00 37.36
6/24/2021 701 30299 45,760.00 2,750.00 16.64
6/24/2021 702 30275 38,160.00 2,750.00 13.88
6/24/2021 703 30274 49,070.00 2,750.00 17.84
6/24/2021 704 30302 29,420.00 2,750.00 10.70
6/24/2021 705 30300 25,880.00 2,750.00 9.41
6/24/2021 706 30275 20,810.00 2,750.00 7.57
6/24/2021 707 30365 17,740.00 2,750.00 6.45
6/24/2021 708 30296 34,530.00 2,750.00 12.56
6/24/2021 709 30358 27,390.00 2,750.00 9.96
6/24/2021 710 30274 12,430.00 2,750.00 4.52
6/24/2021 711 30299 3,810.00 2,750.00 1.39
6/24/2021 693 30274 4,500.00 2,750.00 1.64
6/24/2021 694 30299 23,030.00 2,750.00 8.37
6/24/2021 695 30300 40,670.00 2,750.00 14.79
6/24/2021 696 30275 4,560.00 2,750.00 1.66
6/24/2021 697 30294 19,550.00 2,750.00 7.11
6/24/2021 698 30296 12,940.00 2,750.00 4.71
6/21/2021 663 30296 5,270.00 2,750.00 1.92
6/21/2021 664 30299 13,990.00 2,750.00 5.09
6/21/2021 665 30300 6,440.00 2,750.00 2.34
6/21/2021 666 30302 8,740.00 2,750.00 3.18
6/21/2021 667 30274 3,140.00 2,750.00 1.14
6/21/2021 668 30296 50,630.00 2,750.00 18.41
6/21/2021 669 30299 32,750.00 2,750.00 11.91
6/21/2021 670 30358 8,680.00 2,750.00 3.16
6/21/2021 671 30296 37,750.00 2,750.00 13.73
6/21/2021 672 30299 75,890.00 2,750.00 27.60
6/21/2021 673 30358 73,400.00 2,750.00 26.69
6/21/2021 674 30296 59,400.00 2,750.00 21.60
6/22/2021 688 30358 144,750.00 2,750.00 52.64
6/22/2021 689 30294 90,670.00 2,750.00 32.97
6/22/2021 692 30358 17,150.00 2,750.00 6.24
6/21/2021 675 30299 56,230.00 2,750.00 20.45
6/21/2021 676 2,750.00 0.00
6/21/2021 677 30358 138,280.00 2,750.00 50.28
6/21/2021 678 30296 18,210.00 2,750.00 6.62
6/21/2021 679 30358 52,890.00 2,750.00 19.23
6/21/2021 680 30296 21,980.00 2,750.00 7.99
6/17/2021 653 30299 33,500.00 2,750.00 12.18
6/17/2021 654 30365 37,690.00 2,750.00 13.71
6/17/2021 655 30296 34,530.00 2,750.00 12.56
6/17/2021 656 30274 24,200.00 2,750.00 8.80
6/17/2021 657 30300 23,130.00 2,750.00 8.41
6/17/2021 658 30302 20,730.00 2,750.00 7.54
6/17/2021 659 2,750.00 0.00
6/17/2021 660 30299 16,170.00 2,750.00 5.88
6/17/2021 661 30275 16,510.00 2,750.00 6.00
6/17/2021 638 30296 22,580.00 2,750.00 8.21
6/17/2021 639 30300 16,690.00 2,750.00 6.07
6/17/2021 636 30302 22,090.00 2,750.00 8.03
6/17/2021 637 30299 20,910.00 2,750.00 7.60
6/17/2021 638 2,750.00 0.00
6/17/2021 639 2,750.00 0.00
6/17/2021 640 30365 16,730.00 2,750.00 6.08
6/17/2021 641 30275 14,480.00 2,750.00 5.27
6/17/2021 646 30275 20,610.00 2,750.00 7.49
6/17/2021 649 30365 17,280.00 2,750.00 6.28
6/17/2021 650 30296 11,550.00 2,750.00 4.20
6/17/2021 651 30302 9,970.00 2,750.00 3.63
6/17/2021 652 30274 1,690.00 2,750.00 0.61
6/17/2021 642 30302 18,970.00 2,750.00 6.90
6/17/2021 643 30296 22,600.00 2,750.00 8.22
6/17/2021 644 30299 22,310.00 2,750.00 8.11
6/17/2021 645 30300 22,460.00 2,750.00 8.17
6/15/2021 625 30275 20,690.00 2,750.00 7.52
6/15/2021 626 30300 24,890.00 2,750.00 9.05
6/15/2021 627 30296 22,010.00 2,750.00 8.00
6/15/2021 628 30358 24,850.00 2,750.00 9.04
6/15/2021 629 30173 17,800.00 2,750.00 6.47
6/15/2021 630 30365 28,110.00 2,750.00 10.22
6/15/2021 619 30173 32,750.00 2,750.00 11.91
6/15/2021 620 30275 36,350.00 2,750.00 13.22
6/15/2021 621 30274 31,860.00 2,750.00 11.59
6/15/2021 622 30816 15,510.00 2,750.00 5.64
6/15/2021 623 30365 22,320.00 2,750.00 8.12
6/15/2021 624 30299 22,810.00 2,750.00 8.29
6/15/2021 615 30275 41,580.00 2,750.00 15.12
6/15/2021 616 30274 22,780.00 2,750.00 8.28
6/15/2021 613 30365 34,210.00 2,750.00 12.44
6/15/2021 614 30122 5,130.00 2,750.00 1.87
6/15/2021 617 30365 20,080.00 2,750.00 7.30
6/15/2021 618 30302 38,410.00 2,750.00 13.97
6/15/2021 608 30302 39,530.00 2,750.00 14.37
6/15/2021 609 30365 35,470.00 2,750.00 12.90
6/15/2021 610 30173 20,930.00 2,750.00 7.61
6/15/2021 611 30296 30,260.00 2,750.00 11.00
6/14/2021 557 30274 6,370.00 2,750.00 2.32
6/14/2021 558 30275 27,660.00 2,750.00 10.06
6/14/2021 559 30294 12,460.00 2,750.00 4.53
6/14/2021 560 30300 47,900.00 2,750.00 17.42
6/14/2021 561 30358 6,610.00 2,750.00 2.40
6/14/2021 604 30173 15,370.00 2,750.00 5.59
6/14/2021 605 30358 35,290.00 2,750.00 12.83
6/14/2021 606 30299 21,540.00 2,750.00 7.83
6/14/2021 607 30275 20,470.00 2,750.00 7.44
6/14/2021 596 30299 5,860.00 2,750.00 2.13
6/14/2021 597 30275 23,880.00 2,750.00 8.68
6/14/2021 600 30296 20,130.00 2,750.00 7.32
6/14/2021 601 30365 730.00 2,750.00 0.27
6/14/2021 602 30274 19,980.00 2,750.00 7.27
6/14/2021 603 30302 25,700.00 2,750.00 9.35
6/14/2021 592 30300 16,470.00 2,750.00 5.99
6/14/2021 593 30302 22,120.00 2,750.00 8.04
6/14/2021 594 30173 15,470.00 2,750.00 5.63
6/14/2021 595 30358 1,810.00 2,750.00 0.66
6/14/2021 598 30294 20,640.00 2,750.00 7.51
6/14/2021 599 30113 12,870.00 2,750.00 4.68
6/14/2021 580 30300 25,320.00 2,750.00 9.21
6/14/2021 581 30365 21,490.00 2,750.00 7.81
6/14/2021 582 30133 13,290.00 2,750.00 4.83
6/14/2021 583 30302 33,060.00 2,750.00 12.02
6/14/2021 584 30358 20,030.00 2,750.00 7.28
6/14/2021 585 30173 15,070.00 2,750.00 5.48
6/14/2021 574 30302 25,800.00 2,750.00 9.38
6/14/2021 575 30275 26,630.00 2,750.00 9.68
6/14/2021 576 30299 24,560.00 2,750.00 8.93
6/14/2021 577 30294 30,290.00 2,750.00 11.01
6/14/2021 578 30274 15,670.00 2,750.00 5.70
6/14/2021 579 30296 11,270.00 2,750.00 4.10
6/14/2021 566 30299 7,030.00 2,750.00 2.56
6/14/2021 567 30275 10,740.00 2,750.00 3.91
6/14/2021 570 30173 25,900.00 2,750.00 9.42
6/14/2021 571 30296 39,670.00 2,750.00 14.43
6/14/2021 572 30365 23,430.00 2,750.00 8.52
6/14/2021 573 30358 20,680.00 2,750.00 7.52
6/14/2021 586 30299 21,140.00 2,750.00 7.69
6/14/2021 587 30275 19,690.00 2,750.00 7.16
6/14/2021 588 30294 21,810.00 2,750.00 7.93
6/14/2021 589 30296 35,450.00 2,750.00 12.89
6/14/2021 590 30365 36,450.00 2,750.00 13.25
6/14/2021 591 30274 13,210.00 2,750.00 4.80
6/14/2021 562 30365 10,940.00 2,750.00 3.98
6/14/2021 563 30296 10,510.00 2,750.00 3.82
6/14/2021 564 30358 125,770.00 2,750.00 45.73
6/14/2021 565 30294 28,620.00 2,750.00 10.41
6/14/2021 568 30302 12,010.00 2,750.00 4.37
6/14/2021 569 30300 42,160.00 2,750.00 15.33
6/15/2021 631 30274 28,950.00 2,750.00 10.53
6/15/2021 632 30816 11,920.00 2,750.00 4.33
6/15/2021 633 30299 16,850.00 2,750.00 6.13
6/15/2021 634 30302 45,110.00 2,750.00 16.40
6/15/2021 635 30275 11,010.00 2,750.00 4.00
6/12/2021 550 30294 5,090.00 2,750.00 1.85
6/12/2021 551 30173 8,210.00 2,750.00 2.99
6/12/2021 552 30358 7,750.00 2,750.00 2.82
6/12/2021 553 30365 53,470.00 2,750.00 19.44
6/10/2021 517 30274 26,050.00 2,750.00 9.47
6/10/2021 518 30330 26,050.00 2,750.00 9.47
6/10/2021 519 30294 27,900.00 2,750.00 10.15
6/10/2021 520 30299 22,100.00 2,750.00 8.04
6/10/2021 522 30915 41,010.00 2,750.00 14.91
6/10/2021 523 30365 34,360.00 2,750.00 12.49
6/10/2021 534 30275 28,670.00 2,750.00 10.43
6/10/2021 535 30296 23,060.00 2,750.00 8.39
6/10/2021 513 30173 2,240.00 2,750.00 0.81
6/10/2021 514 30909 23,020.00 2,750.00 8.37
6/10/2021 546 30296 22,000.00 2,750.00 8.00
6/10/2021 547 30294 25,150.00 2,750.00 9.15
6/10/2021 548 30299 33,370.00 2,750.00 12.13
6/10/2021 549 30358 14,330.00 2,750.00 5.21
6/10/2021 540 30909 16,950.00 2,750.00 6.16
6/10/2021 541 30365 32,680.00 2,750.00 11.88
6/10/2021 542 30300 21,050.00 2,750.00 7.65
6/10/2021 543 30912 21,530.00 2,750.00 7.83
6/10/2021 544 30275 24,210.00 2,750.00 8.80
6/10/2021 545 30302 28,170.00 2,750.00 10.24
6/10/2021 532 30294 36,520.00 2,750.00 13.28
6/10/2021 533 30358 27,920.00 2,750.00 10.15
6/10/2021 538 30106 17,740.00 2,750.00 6.45
6/10/2021 539 30300 2,330.00 2,750.00 0.85
6/10/2021 536 30173 18,570.00 2,750.00 6.75
6/10/2021 537 30913 39,260.00 2,750.00 14.28
6/10/2021 524 30358 102,170.00 2,750.00 37.15
6/10/2021 525 30173 20,390.00 2,750.00 7.41
6/10/2021 526 30296 13,420.00 2,750.00 4.88
6/10/2021 527 30913 33,490.00 2,750.00 12.18
6/9/2021 504 30912 37,370.00 2,750.00 13.59
6/9/2021 505 30358 47,620.00 2,750.00 17.32
6/9/2021 506 30294 92,550.00 2,750.00 33.65
6/9/2021 507 30275 67,970.00 2,750.00 24.72
6/9/2021 510 30365 5,510.00 2,750.00 2.00
6/9/2021 511 30299 40,870.00 2,750.00 14.86
6/9/2021 492 30915 21,160.00 2,750.00 7.69
6/9/2021 493 30358 117,900.00 2,750.00 42.87
6/9/2021 496 30299 30,080.00 2,750.00 10.94
6/9/2021 497 30296 21,780.00 2,750.00 7.92
6/9/2021 502 30913 29,180.00 2,750.00 10.61
6/9/2021 503 30915 30,810.00 2,750.00 11.20
6/9/2021 500 30909 28,970.00 2,750.00 10.53
6/9/2021 501 30816 28,910.00 2,750.00 10.51
6/8/2021 479 30274 9,440.00 2,750.00 3.43
6/8/2021 480 30299 5,960.00 2,750.00 2.17
6/10/2021 515 30313 23,020.00 2,750.00 8.37
6/10/2021 516 30296 31,000.00 2,750.00 11.27
6/8/2021 477 30358 52,570.00 2,750.00 19.12
6/8/2021 478 30294 40,360.00 2,750.00 14.68
6/8/2021 483 30122 25,200.00 2,750.00 9.16
6/8/2021 484 30294 18,950.00 2,750.00 6.89
6/8/2021 485 30358 21,580.00 2,750.00 7.85
6/8/2021 486 30274 22,470.00 2,750.00 8.17
6/8/2021 473 30300 3,370.00 2,750.00 1.23
6/8/2021 474 30302 104,630.00 2,750.00 38.05
6/8/2021 475 30365 39,310.00 2,750.00 14.29
6/8/2021 476 30296 30,040.00 2,750.00 10.92
6/8/2021 489 30296 3,090.00 2,750.00 1.12
6/8/2021 490 30275 1,920.00 2,750.00 0.70
6/8/2021 491 30300 5,690.00 2,750.00 2.07
6/8/2021 467 30365 2,570.00 2,750.00 0.93
6/8/2021 470 30296 13,750.00 2,750.00 5.00
6/8/2021 468 30294 14,930.00 2,750.00 5.43
6/8/2021 469 30302 16,890.00 2,750.00 6.14
6/8/2021 465 30913 6,970.00 2,750.00 2.53
6/8/2021 466 30912 6,970.00 2,750.00 2.53
6/9/2021 508 30302 31,660.00 2,750.00 11.51
6/9/2021 509 30300 2,120.00 2,750.00 0.77
6/10/2021 512 30358 4,850.00 2,750.00 1.76
6/8/2021 471 30274 22,870.00 2,750.00 8.32
6/8/2021 472 30299 16,240.00 2,750.00 5.91
6/9/2021 498 30365 25,860.00 2,750.00 9.40
6/9/2021 499 30173 26,690.00 2,750.00 9.71
6/8/2021 460 30294 20,470.00 2,750.00 7.44
6/8/2021 461 30302 16,730.00 2,750.00 6.08
6/8/2021 462 30299 64,720.00 2,750.00 23.53
6/8/2021 463 30300 74,240.00 2,750.00 27.00
6/8/2021 487 30302 7,800.00 2,750.00 2.84
6/8/2021 488 30299 150.00 2,750.00 0.05
6/8/2021 481 30275 9,170.00 2,750.00 3.33
6/8/2021 482 30300 42,760.00 2,750.00 15.55
6/3/2021 450 30358 18,290.00 2,750.00 6.65
6/3/2021 451 30299 11,980.00 2,750.00 4.36
6/3/2021 452 30302 11,310.00 2,750.00 4.11
6/3/2021 453 30275 20,960.00 2,750.00 7.62
6/7/2021 457 30300 75,560.00 2,750.00 27.48
6/7/2021 459 30294 19,310.00 2,750.00 7.02
6/8/2021 464 30911 19,540.00 2,750.00 7.11
6/3/2021 440 30122 2,480.00 2,750.00 0.90
6/3/2021 441 30365 30,570.00 2,750.00 11.12
6/3/2021 442 30299 27,270.00 2,750.00 9.92
6/3/2021 443 30275 15,250.00 2,750.00 5.55
6/3/2021 444 30300 17,210.00 2,750.00 6.26
6/3/2021 445 30358 17,800.00 2,750.00 6.47
6/3/2021 446 30296 20,690.00 2,750.00 7.52
6/3/2021 447 30302 21,690.00 2,750.00 7.89
6/3/2021 436 30302 43,240.00 2,750.00 15.72
6/3/2021 437 30300 93,110.00 2,750.00 33.86
6/3/2021 438 30296 14,860.00 2,750.00 5.40
6/3/2021 439 30358 9,930.00 2,750.00 3.61
6/3/2021 434 30299 117,120.00 2,750.00 42.59
6/3/2021 435 30275 63,090.00 2,750.00 22.94
6/2/2021 422 30358 27,740.00 2,750.00 10.09
6/2/2021 423 30299 26,330.00 2,750.00 9.57
6/2/2021 424 30358 22,220.00 2,750.00 8.08
6/2/2021 425 30275 73,070.00 2,750.00 26.57
6/2/2021 426 30300 48,550.00 2,750.00 17.65
6/2/2021 427 30299 64,520.00 2,750.00 23.46
6/2/2021 428 30365 74,360.00 2,750.00 27.04
6/2/2021 429 30296 51,010.00 2,750.00 18.55
6/2/2021 430 30302 73,550.00 2,750.00 26.75
6/2/2021 431 30122 25,870.00 2,750.00 9.41
6/2/2021 432 30296 64,590.00 2,750.00 23.49
6/2/2021 433 30358 45,280.00 2,750.00 16.47
6/2/2021 412 30365 28,910.00 2,750.00 10.51
6/2/2021 413 30299 30,520.00 2,750.00 11.10
6/2/2021 414 30275 29,830.00 2,750.00 10.85
6/2/2021 415 30302 14,030.00 2,750.00 5.10
6/2/2021 418 30358 29,340.00 2,750.00 10.67
6/2/2021 419 30300 43,560.00 2,750.00 15.84
6/2/2021 420 30302 53,630.00 2,750.00 19.50
6/2/2021 421 30299 34,840.00 2,750.00 12.67
6/1/2021 397 30302 41,590.00 2,750.00 15.12
6/1/2021 398 30275 31,990.00 2,750.00 11.63
6/2/2021 416 30299 36,080.00 2,750.00 13.12
6/2/2021 417 30302 60,470.00 2,750.00 21.99
6/1/2021 389 30365 62,280.00 2,750.00 22.65
6/1/2021 390 30299 75,210.00 2,750.00 27.35
6/1/2021 391 30302 85,730.00 2,750.00 31.17
6/1/2021 392 30358 53,300.00 2,750.00 19.38
6/1/2021 393 30275 70,460.00 2,750.00 25.62
6/1/2021 394 30296 21,240.00 2,750.00 7.72
6/1/2021 395 30294 8,800.00 2,750.00 3.20
6/1/2021 396 30300 13,860.00 2,750.00 5.04
6/1/2021 399 30300 370.00 2,750.00 0.13
6/1/2021 400 30299 22,570.00 2,750.00 8.21
6/1/2021 405 30299 35,370.00 2,750.00 12.86
6/1/2021 406 30275 32,440.00 2,750.00 11.80
6/1/2021 407 30296 18,960.00 2,750.00 6.89
6/1/2021 408 30300 54,040.00 2,750.00 19.65
6/1/2021 411 30299 31,950.00 2,750.00 11.62
6/1/2021 401 30365 10,240.00 2,750.00 3.72
6/1/2021 402 30358 17,920.00 2,750.00 6.52
6/1/2021 403 30302 7,290.00 2,750.00 2.65
6/1/2021 404 30365 49,150.00 2,750.00 17.87
5/28/2021 387 30299 1,270.00 2,750.00 0.46
5/28/2021 388 30294 11,300.00 2,750.00 4.11
5/28/2021 383 30302 127,580.00 2,750.00 46.39
5/28/2021 384 30358 23,980.00 2,750.00 8.72
5/28/2021 385 30365 55,910.00 2,750.00 20.33
5/28/2021 386 30275 16,010.00 2,750.00 5.82
5/27/2021 369 30365 5,580.00 2,750.00 2.03
5/27/2021 370 30299 7,120.00 2,750.00 2.59
5/27/2021 371 30302 22,470.00 2,750.00 8.17
5/27/2021 372 30296 8,930.00 2,750.00 3.25
5/27/2021 377 30365 37,050.00 2,750.00 13.47
5/27/2021 378 30296 29,220.00 2,750.00 10.63
5/27/2021 373 30358 50,940.00 2,750.00 18.52
5/27/2021 374 30275 19,320.00 2,750.00 7.03
5/27/2021 375 30274 20,140.00 2,750.00 7.32
5/27/2021 376 30300 56,920.00 2,750.00 20.70
5/27/2021 365 30294 35,920.00 2,750.00 13.06
5/27/2021 366 30302 52,810.00 2,750.00 19.20
5/27/2021 367 30275 8,460.00 2,750.00 3.08
5/27/2021 368 30274 1,340.00 2,750.00 0.49
5/27/2021 362 30275 10,480.00 2,750.00 3.81
5/27/2021 363 30365 13,600.00 2,750.00 4.95
5/27/2021 364 30358 52,230.00 2,750.00 18.99
5/27/2021 358 30302 44,160.00 2,750.00 16.06
5/27/2021 359 30294 58,840.00 2,750.00 21.40
5/27/2021 360 30296 1,860.00 2,750.00 0.68
5/27/2021 361 30300 38,320.00 2,750.00 13.93
5/27/2021 354 30274 54,530.00 2,750.00 19.83
5/27/2021 355 30265 32,690.00 2,750.00 11.89
5/27/2021 356 30299 50,200.00 2,750.00 18.25
5/27/2021 357 30358 57,190.00 2,750.00 20.80
5/27/2021 379 30302 45,960.00 2,750.00 16.71
5/27/2021 380 30365 44,630.00 2,750.00 16.23
5/27/2021 381 30358 10,910.00 2,750.00 3.97
5/27/2021 382 30296 31,210.00 2,750.00 11.35
5/26/2021 322 30358 30,358.00 2,750.00 11.04
5/26/2021 323 30275 49,750.00 2,750.00 18.09
5/26/2021 324 30302 23,660.00 2,750.00 8.60
5/26/2021 325 30296 43,390.00 2,750.00 15.78
5/26/2021 328 30299 32,390.00 2,750.00 11.78
5/26/2021 329 30294 23,210.00 2,750.00 8.44
5/26/2021 330 30302 44,560.00 2,750.00 16.20
5/26/2021 331 30275 40,900.00 2,750.00 14.87
5/26/2021 316 30296 6,570.00 2,750.00 2.39
5/26/2021 317 30275 21,080.00 2,750.00 7.67
5/26/2021 318 30358 19,290.00 2,750.00 7.01
5/26/2021 319 30300 27,720.00 2,750.00 10.08
5/26/2021 312 30365 122,090.00 2,750.00 44.40
5/26/2021 313 30294 101,580.00 2,750.00 36.94
5/26/2021 314 30299 28,790.00 2,750.00 10.47
5/26/2021 315 30302 24,360.00 2,750.00 8.86
5/26/2021 349 30274 29,310.00 2,750.00 10.66
5/26/2021 350 30816 30,520.00 2,750.00 11.10
5/26/2021 344 30275 33,770.00 2,750.00 12.28
5/26/2021 336 30275 44,470.00 2,750.00 16.17
5/26/2021 351 30365 54,970.00 2,750.00 19.99
5/26/2021 352 30294 33,490.00 2,750.00 12.18
5/26/2021 353 30299 48,040.00 2,750.00 17.47
5/26/2021 320 30365 34,600.00 2,750.00 12.58
5/26/2021 311 30300 4,970.00 2,750.00 1.81
5/26/2021 326 30300 13,090.00 2,750.00 4.76
5/26/2021 327 30365 21,250.00 2,750.00 7.73
5/26/2021 345 30358 96,400.00 2,750.00 35.05
5/26/2021 346 30302 50,960.00 2,750.00 18.53
5/26/2021 347 30300 18,030.00 2,750.00 6.56
5/26/2021 348 30275 28,900.00 2,750.00 10.51
5/26/2021 336 30275 44,470.00 2,750.00 16.17
5/26/2021 337 30294 9,620.00 2,750.00 3.50
5/26/2021 338 30274 5,200.00 2,750.00 1.89
5/26/2021 339 30300 32,260.00 2,750.00 11.73
5/26/2021 332 30300 26,110.00 2,750.00 9.49
5/26/2021 333 30358 30,070.00 2,750.00 10.93
5/26/2021 334 30299 34,410.00 2,750.00 12.51
5/26/2021 335 30302 55,960.00 2,750.00 20.35
5/26/2021 340 30358 10,780.00 2,750.00 3.92
5/26/2021 341 30299 48,500.00 2,750.00 17.64
5/26/2021 342 30302 28,500.00 2,750.00 10.36
5/26/2021 343 30296 10,600.00 2,750.00 3.85
5/25/2021 308 30365 29,420.00 2,750.00 10.70
5/25/2021 309 30294 40,150.00 2,750.00 14.60
5/25/2021 310 30274 10,980.00 2,750.00 3.99
5/25/2021 311 30300 4,970.00 2,750.00 1.81
5/25/2021 289 30274 53,370.00 2,750.00 19.41
5/25/2021 290 30294 117,440.00 2,750.00 42.71
5/25/2021 292 30300 113,410.00 2,750.00 41.24
5/25/2021 293 30299 2,850.00 2,750.00 1.04
5/25/2021 294 30294 2,890.00 2,750.00 1.05
5/25/2021 295 30300 10,530.00 2,750.00 3.83
5/25/2021 296 30358 19,860.00 2,750.00 7.22
5/25/2021 297 30133 9,610.00 2,750.00 3.49
5/25/2021 298 30274 2,910.00 2,750.00 1.06
5/25/2021 299 30275 21,070.00 2,750.00 7.66
5/25/2021 300 30365 10,930.00 2,750.00 3.97
5/25/2021 301 30302 5,520.00 2,750.00 2.01
5/25/2021 304 30300 20,530.00 2,750.00 7.47
5/25/2021 305 30299 50,130.00 2,750.00 18.23
5/25/2021 306 30275 53,280.00 2,750.00 19.37
5/25/2021 307 30302 55,040.00 2,750.00 20.01
5/24/2021 273 30302 58,820.00 2,750.00 21.39
5/24/2021 274 30275 55,720.00 2,750.00 20.26
5/24/2021 275 30296 33,820.00 2,750.00 12.30
5/24/2021 276 30300 7,840.00 2,750.00 2.85
5/24/2021 254 30365 16,960.00 2,750.00 6.17
5/24/2021 255 30358 88,060.00 2,750.00 32.02
5/24/2021 271 30365 28,060.00 2,750.00 10.20
5/24/2021 272 30294 12,650.00 2,750.00 4.60
5/24/2021 280 30358 84,140.00 2,750.00 30.60
5/24/2021 281 30300 45,070.00 2,750.00 16.39
5/24/2021 282 30299 28,750.00 2,750.00 10.45
5/24/2021 283 30274 13,050.00 2,750.00 4.75
5/24/2021 284 30294 52,590.00 2,750.00 19.12
5/24/2021 285 30302 61,930.00 2,750.00 22.52
5/24/2021 286 30358 120,180.00 2,750.00 43.70
5/24/2021 287 30300 20,280.00 2,750.00 7.37
5/24/2021 258 30302 51,530.00 2,750.00 18.74
5/24/2021 259 30275 43,350.00 2,750.00 15.76
5/24/2021 256 30300 79,100.00 2,750.00 28.76
5/24/2021 257 30299 52,860.00 2,750.00 19.22
5/24/2021 267 30296 30,850.00 2,750.00 11.22
5/24/2021 268 30274 24,510.00 2,750.00 8.91
5/24/2021 269 30299 116,610.00 2,750.00 42.40
5/24/2021 270 30300 45,140.00 2,750.00 16.41
5/24/2021 260 30296 47,360.00 2,750.00 17.22
5/24/2021 261 30274 3,500.00 2,750.00 1.27
5/24/2021 262 30300 20,960.00 2,750.00 7.62
5/14/2021 31 30274 50,280.00 2,750.00 18.28
5/14/2021 42 30358 920.00 2,750.00 0.33
5/14/2021 28 30358 21,420.00 2,750.00 7.79
5/14/2021 30 30275 85,770.00 2,750.00 31.19
5/14/2021 34 30302 25,510.00 2,750.00 9.28
5/14/2021 39 30297 32,140.00 2,750.00 11.69
5/14/2021 40 30296 42,360.00 2,750.00 15.40
5/14/2021 41 30302 8,920.00 2,750.00 3.24
5/14/2021 38 30274 37,700.00 2,750.00 13.71
5/14/2021 29 30299 1,440.00 2,750.00 0.52
5/14/2021 32 30297 44,890.00 2,750.00 16.32
5/14/2021 35 30300 6,340.00 2,750.00 2.31
5/14/2021 36 30299 49,840.00 2,750.00 18.12
6/14/2021 37 30275 52,860.00 2,750.00 19.22
5/24/2021 265 30275 110,020.00 2,750.00 40.01
5/24/2021 266 30302 97,760.00 2,750.00 35.55
5/24/2021 263 30365 114,040.00 2,750.00 41.47
5/24/2021 264 30294 33,270.00 2,750.00 12.10
5/24/2021 276 30300 7,840.00 2,750.00 2.85
5/24/2021 277 30299 20,050.00 2,750.00 7.29
5/24/2021 278 30294 21,730.00 2,750.00 7.90
5/24/2021 279 30302 45,260.00 2,750.00 16.46
5/23/2021 244 30365 32,710.00 2,750.00 11.89
5/23/2021 245 30296 9,010.00 2,750.00 3.28
5/23/2021 242 30294 40,440.00 2,750.00 14.71
5/23/2021 243 30299 46,040.00 2,750.00 16.74
5/23/2021 250 30275 24,260.00 2,750.00 8.82
5/23/2021 253 30299 20,330.00 2,750.00 7.39
5/22/2021 228 30296 79,860.00 2,750.00 29.04
5/22/2021 229 30365 58,450.00 2,750.00 21.25
5/22/2021 230 30300 83,240.00 2,750.00 30.27
5/22/2021 231 30365 29,770.00 2,750.00 10.83
5/22/2021 239 30294 36,350.00 2,750.00 13.22
5/22/2021 240 30300 28,150.00 2,750.00 10.24
5/22/2021 235 30294 31,000.00 2,750.00 11.27
5/22/2021 236 30274 5,850.00 2,750.00 2.13
5/22/2021 232 30358 62,730.00 2,750.00 22.81
5/22/2021 233 30365 14,470.00 2,750.00 5.26
5/22/2021 223 30358 43,220.00 2,750.00 15.72
5/22/2021 224 30296 9,910.00 2,750.00 3.60
5/22/2021 225 30275 63,580.00 2,750.00 23.12
5/22/2021 218 30365 34,910.00 2,750.00 12.69
5/22/2021 226 30274 23,310.00 2,750.00 8.48
5/22/2021 227 30294 18,470.00 2,750.00 6.72
5/22/2021 221 30274 13,560.00 2,750.00 4.93
5/22/2021 222 30365 90,900.00 2,750.00 33.05
5/22/2021 219 30358 16,280.00 2,750.00 5.92
5/22/2021 220 30296 16,280.00 2,750.00 5.92
5/22/2021 240 30300 28,150.00 2,750.00 10.24
5/23/2021 241 30300 41,820.00 2,750.00 15.21
5/23/2021 246 30275 52,760.00 2,750.00 19.19
5/23/2021 247 30365 46,490.00 2,750.00 16.91
5/21/2021 214 30299 8,700.00 2,750.00 3.16
5/21/2021 217 30358 17,740.00 2,750.00 6.45
5/22/2021 238 30358 25,740.00 2,750.00 9.36
5/22/2021 234 30296 26,490.00 2,750.00 9.63
5/21/2021 215 30275 44,420.00 2,750.00 16.15
5/21/2021 216 30296 50,600.00 2,750.00 18.40
5/21/2021 212 30365 0.00 2,750.00 0.00
5/21/2021 213 30300 0.00 2,750.00 0.00
5/19/2021 179 30299 52,230.00 2,750.00 18.99
5/19/2021 180 30274 69,990.00 2,750.00 25.45
5/20/2021 211 30300 26,230.00 2,750.00 9.54
5/20/2021 203 30275 41,610.00 2,750.00 15.13
5/20/2021 204 30296 31,080.00 2,750.00 11.30
5/20/2021 186 30294 22,410.00 2,750.00 8.15
5/20/2021 187 30275 79,240.00 2,750.00 28.81
5/20/2021 184 30302 6,460.00 2,750.00 2.35
5/20/2021 185 30274 6,510.00 2,750.00 2.37
5/20/2021 211 30300 26,230.00 2,750.00 9.54
5/20/2021 193 30274 3,680.00 2,750.00 1.34
5/20/2021 194 30275 31,610.00 2,750.00 11.49
5/20/2021 191 30302 3,140.00 2,750.00 1.14
5/20/2021 192 30300 8,960.00 2,750.00 3.26
5/20/2021 197 30294 18,230.00 2,750.00 6.63
5/20/2021 198 30302 55,200.00 2,750.00 20.07
5/20/2021 209 30294 53,340.00 2,750.00 19.40
5/20/2021 210 30275 15,380.00 2,750.00 5.59
5/20/2021 211 30300 26,230.00 2,750.00 9.54
5/20/2021 197 30294 18,230.00 2,750.00 6.63
5/20/2021 199 30274 17,030.00 2,750.00 6.19
5/20/2021 200 30300 24,110.00 2,750.00 8.77
5/20/2021 201 30299 25,740.00 2,750.00 9.36
5/20/2021 202 30275 44,280.00 2,750.00 16.10
5/20/2021 195 30299 24,600.00 2,750.00 8.95
5/20/2021 196 30296 28,510.00 2,750.00 10.37
5/20/2021 207 30274 51,290.00 2,750.00 18.65
5/20/2021 208 30358 34,770.00 2,750.00 12.64
5/20/2021 205 30300 24,740.00 2,750.00 9.00
5/20/2021 206 30299 33,380.00 2,750.00 12.14
5/20/2021 188 30299 21,870.00 2,750.00 7.95
5/20/2021 189 30296 15,840.00 2,750.00 5.76
5/20/2021 190 30358 20,260.00 2,750.00 7.37
5/20/2021 181 30300 21,300.00 2,750.00 7.75
5/20/2021 182 30299 18,780.00 2,750.00 6.83
5/20/2021 183 30296 28,030.00 2,750.00 10.19
5/19/2021 159 30294 12,490.00 2,750.00 4.54
5/19/2021 160 30365 66,860.00 2,750.00 24.31
5/19/2021 162 30300 21,510.00 2,750.00 7.82
5/19/2021 163 30296 18,660.00 2,750.00 6.79
5/19/2021 177 30294 23,300.00 2,750.00 8.47
5/19/2021 178 30300 20,520.00 2,750.00 7.46
5/19/2021 179 30299 52,230.00 2,750.00 18.99
5/19/2021 164 30299 15,650.00 2,750.00 5.69
5/19/2021 165 30358 66,920.00 2,750.00 24.33
5/19/2021 166 30365 85,270.00 2,750.00 31.01
5/19/2021 174 30299 45,080.00 2,750.00 16.39
5/19/2021 175 30358 40,270.00 2,750.00 14.64
5/19/2021 155 30302 15,760.00 2,750.00 5.73
5/19/2021 156 30365 15,910.00 2,750.00 5.79
5/19/2021 153 30294 46,780.00 2,750.00 17.01
5/19/2021 154 30296 14,090.00 2,750.00 5.12
5/19/2021 176 30302 22,410.00 2,750.00 8.15
5/19/2021 170 30300 40,990.00 2,750.00 14.91
5/19/2021 171 30358 6,340.00 2,750.00 2.31
5/19/2021 157 30296 15,620.00 2,750.00 5.68
5/19/2021 158 30358 18,820.00 2,750.00 6.84
5/25/2021 302 30299 14,310.00 2,750.00 5.20
5/25/2021 303 30296 52,710.00 2,750.00 19.17
TOTALES 17,466,248.00 1,573,000.00 6,351.36
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+101
1.00 Bolon 54+102
1.00 Bolon 54+103
1.00 Bolon 54+104
1.00 Bolon 54+105
1.00 Bolon 54+106
1.00 Bolon 54+107
1.00 Bolon 54+108
1.00 Bolon 54+109
1.00 Bolon 54+110
1.00 Bolon 54+111
1.00 Bolon 54+112
1.00 Bolon 54+113
1.00 Bolon 54+114
1.00 Bolon 54+115
1.00 Bolon 54+116
1.00 Bolon 54+117
1.00 Bolon 54+118
1.00 Bolon 54+119
1.00 Bolon 54+120
1.00 Bolon 54+121
1.00 Bolon 54+122
1.00 Bolon 54+123
1.00 Bolon 54+124
1.00 Bolon 54+125
1.00 Bolon 54+126
1.00 Bolon 54+127
1.00 Bolon 54+128
1.00 Bolon 54+129
1.00 Bolon 54+130
1.00 Bolon 54+131
1.00 Bolon 54+132
1.00 Bolon 54+133
1.00 Bolon 54+134
1.00 Bolon 54+135
1.00 Bolon 54+136
1.00 Bolon 54+137
1.00 Bolon 54+138
1.00 Bolon 54+139
1.00 Bolon 54+140
1.00 Bolon 54+141
1.00 Bolon 54+142
1.00 Bolon 54+143
1.00 Bolon 54+144
1.00 Bolon 54+145
1.00 Bolon 54+146
1.00 Bolon 54+147
1.00 Bolon 54+148
1.00 Bolon 54+149
1.00 Bolon 54+150
1.00 Bolon 54+151
1.00 Bolon 54+152
1.00 Bolon 54+153
1.00 Bolon 54+154
1.00 Bolon 54+155
1.00 Bolon 54+156
1.00 Bolon 54+157
1.00 Bolon 54+158
1.00 Bolon 54+159
1.00 Bolon 54+160
1.00 Bolon 54+161
1.00 Bolon 54+162
1.00 Bolon 54+163
1.00 Bolon 54+164
1.00 Bolon 54+165
1.00 Bolon 54+166
1.00 Bolon 54+167
1.00 Bolon 54+168
1.00 Bolon 54+169
1.00 Bolon 54+170
1.00 Bolon 54+171
1.00 Bolon 54+172
1.00 Bolon 54+173
1.00 Bolon 54+174
1.00 Bolon 54+175
1.00 Bolon 54+176
1.00 Bolon 54+177
1.00 Bolon 54+178
1.00 Bolon 54+179
1.00 Bolon 54+180
1.00 Bolon 54+181
1.00 Bolon 54+182
1.00 Bolon 54+183
1.00 Bolon 54+184
1.00 Bolon 54+185
1.00 Bolon 54+186
1.00 Bolon 54+187
1.00 Bolon 54+188
1.00 Bolon 54+189
1.00 Bolon 54+190
1.00 Bolon 54+191
1.00 Bolon 54+192
1.00 Bolon 54+193
1.00 Bolon 54+194
1.00 Bolon 54+195
1.00 Bolon 54+196
1.00 Bolon 54+197
1.00 Bolon 54+198
1.00 Bolon 54+199
1.00 Bolon 54+200
1.00 Bolon 54+201
1.00 Bolon 54+202
1.00 Bolon 54+203
1.00 Bolon 54+204
1.00 Bolon 54+205
1.00 Bolon 54+206
1.00 Bolon 54+207
1.00 Bolon 54+208
1.00 Bolon 54+209
1.00 Bolon 54+210
1.00 Bolon 54+211
1.00 Bolon 54+212
1.00 Bolon 54+213
1.00 Bolon 54+214
1.00 Bolon 54+215
1.00 Bolon 54+216
1.00 Bolon 54+217
1.00 Bolon 54+218
1.00 Bolon 54+219
1.00 Bolon 54+220
1.00 Bolon 54+221
1.00 Bolon 54+222
1.00 Bolon 54+223
1.00 Bolon 54+224
1.00 Bolon 54+225
1.00 Bolon 54+226
1.00 Bolon 54+227
1.00 Bolon 54+228
1.00 Bolon 54+229
1.00 Bolon 54+230
1.00 Bolon 54+231
1.00 Bolon 54+232
1.00 Bolon 54+233
1.00 Bolon 54+234
1.00 Bolon 54+235
1.00 Bolon 54+236
1.00 Bolon 54+237
1.00 Bolon 54+238
1.00 Bolon 54+239
1.00 Bolon 54+240
1.00 Bolon 54+241
1.00 Bolon 54+242
1.00 Bolon 54+243
1.00 Bolon 54+244
1.00 Bolon 54+245
1.00 Bolon 54+246
1.00 Bolon 54+247
1.00 Bolon 54+248
1.00 Bolon 54+249
1.00 Bolon 54+250
1.00 Bolon 54+251
1.00 Bolon 54+252
1.00 Bolon 54+253
1.00 Bolon 54+254
1.00 Bolon 54+255
1.00 Bolon 54+256
1.00 Bolon 54+257
1.00 Bolon 54+258
1.00 Bolon 54+259
1.00 Bolon 54+260
1.00 Bolon 54+261
1.00 Bolon 54+262
1.00 Bolon 54+263
1.00 Bolon 54+264
1.00 Bolon 54+265
1.00 Bolon 54+266
1.00 Bolon 54+267
1.00 Bolon 54+268
1.00 Bolon 54+269
1.00 Bolon 54+270
1.00 Bolon 54+271
1.00 Bolon 54+272
1.00 Bolon 54+273
1.00 Bolon 54+274
1.00 Bolon 54+275
1.00 Bolon 54+276
1.00 Bolon 54+277
1.00 Bolon 54+278
1.00 Bolon 54+279
1.00 Bolon 54+280
1.00 Bolon 54+281
1.00 Bolon 54+282
1.00 Bolon 54+283
1.00 Bolon 54+284
1.00 Bolon 54+285
1.00 Bolon 54+286
1.00 Bolon 54+287
1.00 Bolon 54+288
1.00 Bolon 54+289
1.00 Bolon 54+290
1.00 Bolon 54+291
1.00 Bolon 54+292
1.00 Bolon 54+293
1.00 Bolon 54+294
1.00 Bolon 54+295
1.00 Bolon 54+296
1.00 Bolon 54+297
1.00 Bolon 54+298
1.00 Bolon 54+299
1.00 Bolon 54+300
1.00 Bolon 54+301
1.00 Bolon 54+302
1.00 Bolon 54+303
1.00 Bolon 54+304
1.00 Bolon 54+305
1.00 Bolon 54+306
1.00 Bolon 54+307
1.00 Bolon 54+308
1.00 Bolon 54+309
1.00 Bolon 54+310
1.00 Bolon 54+311
1.00 Bolon 54+312
1.00 Bolon 54+313
1.00 Bolon 54+314
1.00 Bolon 54+315
1.00 Bolon 54+316
1.00 Bolon 54+317
1.00 Bolon 54+318
1.00 Bolon 54+319
1.00 Bolon 54+320
1.00 Bolon 54+321
1.00 Bolon 54+322
1.00 Bolon 54+323
1.00 Bolon 54+324
1.00 Bolon 54+325
1.00 Bolon 54+326
1.00 Bolon 54+327
1.00 Bolon 54+328
1.00 Bolon 54+329
1.00 Bolon 54+330
1.00 Bolon 54+331
1.00 Bolon 54+332
1.00 Bolon 54+333
1.00 Bolon 54+334
1.00 Bolon 54+335
1.00 Bolon 54+336
1.00 Bolon 54+337
1.00 Bolon 54+338
1.00 Bolon 54+339
1.00 Bolon 54+340
1.00 Bolon 54+341
1.00 Bolon 54+342
1.00 Bolon 54+343
1.00 Bolon 54+344
1.00 Bolon 54+345
1.00 Bolon 54+346
1.00 Bolon 54+347
1.00 Bolon 54+348
1.00 Bolon 54+349
1.00 Bolon 54+350
1.00 Bolon 54+351
1.00 Bolon 54+352
1.00 Bolon 54+353
1.00 Bolon 54+354
1.00 Bolon 54+355
1.00 Bolon 54+356
1.00 Bolon 54+357
1.00 Bolon 54+358
1.00 Bolon 54+359
1.00 Bolon 54+360
1.00 Bolon 54+361
1.00 Bolon 54+362
1.00 Bolon 54+363
1.00 Bolon 54+364
1.00 Bolon 54+365
1.00 Bolon 54+366
1.00 Bolon 54+367
1.00 Bolon 54+368
1.00 Bolon 54+369
1.00 Bolon 54+370
1.00 Bolon 54+371
1.00 Bolon 54+372
1.00 Bolon 54+373
1.00 Bolon 54+374
1.00 Bolon 54+375
1.00 Bolon 54+376
1.00 Bolon 54+377
1.00 Bolon 54+378
1.00 Bolon 54+379
1.00 Bolon 54+380
1.00 Bolon 54+381
1.00 Bolon 54+382
1.00 Bolon 54+383
1.00 Bolon 54+384
1.00 Bolon 54+385
1.00 Bolon 54+386
1.00 Bolon 54+387
1.00 Bolon 54+388
1.00 Bolon 54+389
1.00 Bolon 54+390
1.00 Bolon 54+391
1.00 Bolon 54+392
1.00 Bolon 54+393
1.00 Bolon 54+394
1.00 Bolon 54+395
1.00 Bolon 54+396
1.00 Bolon 54+397
1.00 Bolon 54+398
1.00 Bolon 54+399
1.00 Bolon 54+400
1.00 Bolon 54+401
1.00 Bolon 54+402
1.00 Bolon 54+403
1.00 Bolon 54+404
1.00 Bolon 54+405
1.00 Bolon 54+406
1.00 Bolon 54+407
1.00 Bolon 54+408
1.00 Bolon 54+409
1.00 Bolon 54+410
1.00 Bolon 54+411
1.00 Bolon 54+412
1.00 Bolon 54+413
1.00 Bolon 54+414
1.00 Bolon 54+415
1.00 Bolon 54+416
1.00 Bolon 54+417
1.00 Bolon 54+418
1.00 Bolon 54+419
1.00 Bolon 54+420
1.00 Bolon 54+421
1.00 Bolon 54+422
1.00 Bolon 54+423
1.00 Bolon 54+424
1.00 Bolon 54+425
1.00 Bolon 54+426
1.00 Bolon 54+427
1.00 Bolon 54+428
1.00 Bolon 54+429
1.00 Bolon 54+430
1.00 Bolon 54+431
1.00 Bolon 54+432
1.00 Bolon 54+433
1.00 Bolon 54+434
1.00 Bolon 54+435
1.00 Bolon 54+436
1.00 Bolon 54+437
1.00 Bolon 54+438
1.00 Bolon 54+439
1.00 Bolon 54+440
1.00 Bolon 54+441
1.00 Bolon 54+442
1.00 Bolon 54+443
1.00 Bolon 54+444
1.00 Bolon 54+445
1.00 Bolon 54+446
1.00 Bolon 54+447
1.00 Bolon 54+448
1.00 Bolon 54+449
1.00 Bolon 54+450
1.00 Bolon 54+451
1.00 Bolon 54+452
1.00 Bolon 54+453
1.00 Bolon 54+454
1.00 Bolon 54+455
1.00 Bolon 54+456
1.00 Bolon 54+457
1.00 Bolon 54+458
1.00 Bolon 54+459
1.00 Bolon 54+460
1.00 Bolon 54+461
1.00 Bolon 54+462
1.00 Bolon 54+463
1.00 Bolon 54+464
1.00 Bolon 54+465
1.00 Bolon 54+466
1.00 Bolon 54+467
1.00 Bolon 54+468
1.00 Bolon 54+469
1.00 Bolon 54+470
1.00 Bolon 54+471
1.00 Bolon 54+472
1.00 Bolon 54+473
1.00 Bolon 54+474
1.00 Bolon 54+475
1.00 Bolon 54+476
1.00 Bolon 54+477
1.00 Bolon 54+478
1.00 Bolon 54+479
1.00 Bolon 54+480
1.00 Bolon 54+481
1.00 Bolon 54+482
1.00 Bolon 54+483
1.00 Bolon 54+484
1.00 Bolon 54+485
1.00 Bolon 54+486
1.00 Bolon 54+487
1.00 Bolon 54+488
1.00 Bolon 54+489
1.00 Bolon 54+490
1.00 Bolon 54+491
1.00 Bolon 54+492
1.00 Bolon 54+493
1.00 Bolon 54+494
1.00 Bolon 54+495
1.00 Bolon 54+496
1.00 Bolon 54+497
1.00 Bolon 54+498
1.00 Bolon 54+499
1.00 Bolon 54+500
1.00 Bolon 54+501
1.00 Bolon 54+502
1.00 Bolon 54+503
1.00 Bolon 54+504
1.00 Bolon 54+505
1.00 Bolon 54+506
1.00 Bolon 54+507
1.00 Bolon 54+508
1.00 Bolon 54+509
1.00 Bolon 54+510
1.00 Bolon 54+511
1.00 Bolon 54+512
1.00 Bolon 54+513
1.00 Bolon 54+514
1.00 Bolon 54+515
1.00 Bolon 54+516
1.00 Bolon 54+517
1.00 Bolon 54+518
1.00 Bolon 54+519
1.00 Bolon 54+520
1.00 Bolon 54+521
1.00 Bolon 54+522
1.00 Bolon 54+523
1.00 Bolon 54+524
1.00 Bolon 54+525
1.00 Bolon 54+526
1.00 Bolon 54+527
1.00 Bolon 54+528
1.00 Bolon 54+529
1.00 Bolon 54+530
1.00 Bolon 54+531
1.00 Bolon 54+532
1.00 Bolon 54+533
1.00 Bolon 54+534
1.00 Bolon 54+535
1.00 Bolon 54+536
1.00 Bolon 54+537
1.00 Bolon 54+538
1.00 Bolon 54+539
1.00 Bolon 54+540
1.00 Bolon 54+541
1.00 Bolon 54+542
1.00 Bolon 54+543
1.00 Bolon 54+544
1.00 Bolon 54+545
1.00 Bolon 54+546
1.00 Bolon 54+547
1.00 Bolon 54+548
1.00 Bolon 54+549
1.00 Bolon 54+550
1.00 Bolon 54+551
1.00 Bolon 54+552
1.00 Bolon 54+553
1.00 Bolon 54+554
1.00 Bolon 54+555
1.00 Bolon 54+556
1.00 Bolon 54+557
1.00 Bolon 54+558
1.00 Bolon 54+559
1.00 Bolon 54+560
1.00 Bolon 54+561
1.00 Bolon 54+562
1.00 Bolon 54+563
1.00 Bolon 54+564
1.00 Bolon 54+565
1.00 Bolon 54+566
1.00 Bolon 54+567
1.00 Bolon 54+568
1.00 Bolon 54+569
1.00 Bolon 54+570
1.00 Bolon 54+571
1.00 Bolon 54+572
1.00 Bolon 54+573
1.00 Bolon 54+574
1.00 Bolon 54+575
1.00 Bolon 54+576
1.00 Bolon 54+577
1.00 Bolon 54+578
1.00 Bolon 54+579
1.00 Bolon 54+580
1.00 Bolon 54+581
1.00 Bolon 54+582
1.00 Bolon 54+583
1.00 Bolon 54+584
1.00 Bolon 54+585
1.00 Bolon 54+586
1.00 Bolon 54+587
1.00 Bolon 54+588
1.00 Bolon 54+589
1.00 Bolon 54+590
572.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3) Viajes Material Estac. Destino
9/5/2021 1308 30299 397,810.00 2,750.00 144.66 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1310 30273 394,890.00 2,750.00 143.60 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1309 30275 39,275.00 2,750.00 14.28 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1311 30358 398,080.00 2,750.00 144.76 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1302 30275 400,580.00 2,750.00 145.67 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1304 30273 400,110.00 2,750.00 145.49 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1306 30360 397,560.00 2,750.00 144.57 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1303 30299 401,270.00 2,750.00 145.92 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1305 30358 400,530.00 2,750.00 145.65 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1307 30303 399,360.00 2,750.00 145.22 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1296 30303 376,620.00 2,750.00 136.95 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1298 30273 400,030.00 2,750.00 145.47 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1300 30360 397,270.00 2,750.00 144.46 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1297 30275 400,690.00 2,750.00 145.71 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1299 30350 400,460.00 2,750.00 145.62 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1301 30303 396,490.00 2,750.00 144.18 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1204 30243 394,930.00 2,750.00 143.61 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1286 30273 390,580.00 2,750.00 142.03 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1200 30350 398,320.00 2,750.00 144.84 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1287 30243 400,080.00 2,750.00 145.48 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1289 30299 364,670.00 2,750.00 132.61 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1290 30360 394,220.00 2,750.00 143.35 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1292 30275 376,160.00 2,750.00 136.79 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1294 30299 397,690.00 2,750.00 144.61 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1291 30303 396,690.00 2,750.00 144.25 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1293 30273 396,250.00 2,750.00 144.09 1.00 ROCA CAMBIO DE LINEA
9/5/2021 1295 30360 403,560.00 2,750.00 146.75 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1233 30350 343,060.00 2,750.00 124.75 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1222 30294 398,010.00 2,750.00 144.73 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1223 30299 395,520.00 2,750.00 143.83 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1231 30299 397,250.00 2,750.00 144.45 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1203 30299 396,520.00 2,750.00 144.19 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1223 30299 396,520.00 2,750.00 144.19 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1232 30300 389,300.00 2,750.00 141.56 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1245 30350 336,970.00 2,750.00 122.53 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1240 30275 391,740.00 2,750.00 142.45 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1242 30243 363,770.00 2,750.00 132.28 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1247 30300 355,360.00 2,750.00 129.22 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1241 30299 363,650.00 2,750.00 132.24 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1243 30274 362,080.00 2,750.00 131.67 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1248 30360 373,380.00 2,750.00 135.77 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1254 30243 389,170.00 2,750.00 141.52 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1261 30275 390,340.00 2,750.00 141.94 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1253 30274 398,680.00 2,750.00 144.97 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1255 30358 395,370.00 2,750.00 143.77 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1262 30293 385,940.00 2,750.00 140.34 1.00 ROCA CAMBIO DE LINEA
9/4/2021 30274 393,780.00 2,750.00 143.19 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1256 30360 348,230.00 2,750.00 126.63 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1258 30300 395,830.00 2,750.00 143.94 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1235 30358 391,280.00 2,750.00 142.28 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1257 30273 340,230.00 2,750.00 123.72 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1260 30299 393,240.00 2,750.00 143.00 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1278 30273 399,820.00 2,750.00 145.39 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1202 30274 386,280.00 2,750.00 140.47 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1280 30243 392,790.00 2,750.00 142.83 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1279 30360 387,110.00 2,750.00 140.77 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1281 30275 303,610.00 2,750.00 110.40 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1272 30274 391,030.00 2,750.00 142.19 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1274 30243 391,600.00 2,750.00 142.40 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1276 30358 391,360.00 2,750.00 142.31 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1273 30275 389,340.00 2,750.00 141.58 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1275 30360 393,010.00 2,750.00 142.91 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1277 30300 392,040.00 2,750.00 142.56 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1107 30299 396,660.00 2,750.00 144.24 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1109 30300 393,140.00 2,750.00 142.96 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1105 30300 397,070.00 2,750.00 144.39 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1186 30274 395,960.00 2,750.00 143.99 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1188 30243 391,970.00 2,750.00 142.53 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1190 30360 381,170.00 2,750.00 138.61 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1174 30303 395,100.00 2,750.00 143.67 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1181 30273 390,860.00 2,750.00 142.13 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1183 30294 395,430.00 2,750.00 143.79 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1175 30294 397,390.00 2,750.00 144.51 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1182 30360 392,910.00 2,750.00 142.88 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1184 30243 390,820.00 2,750.00 142.12 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1174 30303 395,100.00 2,750.00 143.67 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1181 30273 390,860.00 2,750.00 142.13 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1103 30294 395,430.00 2,750.00 143.79 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1175 30291 397,390.00 2,750.00 144.51 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1182 30360 392,910.00 2,750.00 142.88 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1194 30243 390,820.00 2,750.00 142.12 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1172 30273 337,160.00 2,750.00 122.60 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1176 30243 393,900.00 2,750.00 143.24 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1179 30299 395,970.00 2,750.00 143.99 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1173 30360 395,280.00 2,750.00 143.74 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1177 30350 394,060.00 2,750.00 143.29 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1180 30303 395,430.00 2,750.00 143.79 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1162 30303 389,840.00 2,750.00 141.76 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1168 30358 398,730.00 2,750.00 144.99 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1170 30300 393,050.00 2,750.00 142.93 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1163 30360 364,770.00 2,750.00 132.64 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1169 30274 383,270.00 2,750.00 139.37 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1171 30296 393,050.00 2,750.00 142.93 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1210 30294 395,120.00 2,750.00 143.68 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1226 30360 401,530.00 2,750.00 146.01 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1290 30360 353,580.00 2,750.00 128.57 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1289 30360 353,580.00 2,750.00 128.57 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1219 30274 388,880.00 2,750.00 141.41 1.00 ROCA CAMBIO DE LINEA
9/4/2021 1227 30303 401,530.00 2,750.00 146.01 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1021 30399 393,580.00 2,750.00 143.12 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1212 30243 394,220.00 2,750.00 143.35 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1214 30294 395,670.00 2,750.00 143.88 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1216 30300 393,950.00 2,750.00 143.25 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1213 30360 392,140.00 2,750.00 142.60 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1215 30299 390,660.00 2,750.00 142.06 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1217 30243 390,610.00 2,750.00 142.04 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1207 30294 400,060.00 2,750.00 145.48 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1219 30274 394,230.00 2,750.00 143.36 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1209 30300 394,110.00 2,750.00 143.31 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1211 30299 394,980.00 2,750.00 143.63 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1203 30299 397,050.00 2,750.00 144.38 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1205 30243 395,210.00 2,750.00 143.71 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1204 30274 392,670.00 2,750.00 142.79 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1206 30360 391,240.00 2,750.00 142.27 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1197 30350 401,170.00 2,750.00 145.88 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1199 30243 396,270.00 2,750.00 144.10 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1201 30294 397,500.00 2,750.00 144.55 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1198 30274 394,000.00 2,750.00 143.27 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1200 30360 390,610.00 2,750.00 142.04 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1202 30358 401,050.00 2,750.00 145.84 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1191 30294 396,430.00 2,750.00 144.16 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1193 30243 396,740.00 2,750.00 144.27 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1195 30360 398,430.00 2,750.00 144.88 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1192 30274 392,760.00 2,750.00 142.82 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1194 30300 394,570.00 2,750.00 143.48 1.00 ROCA CAMBIO DE LINEA
9/3/2021 1196 30294 396,190.00 2,750.00 144.07 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1167 30274 380,710.00 2,750.00 138.44 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1164 30299 389,420.00 2,750.00 141.61 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1160 30300 386,440.00 2,750.00 140.52 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1166 30273 389,540.00 2,750.00 141.65 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1165 30358 390,190.00 2,750.00 141.89 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1161 30294 391,170.00 2,750.00 142.24 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1148 30294 389,440.00 2,750.00 141.61 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1144 30358 392,710.00 2,750.00 142.80 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1146 30303 392,250.00 2,750.00 142.64 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1149 30299 390,870.00 2,750.00 142.13 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1145 30300 390,600.00 2,750.00 142.04 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1147 30360 390,050.00 2,750.00 141.84 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1154 30303 388,870.00 2,750.00 141.41 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1152 30817 384,550.00 2,750.00 139.84 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1150 30274 392,620.00 2,750.00 142.77 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1155 30299 387,810.00 2,750.00 141.02 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1153 30360 389,830.00 2,750.00 141.76 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1151 30300 389,160.00 2,750.00 141.51 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1142 30274 386,620.00 2,750.00 140.59 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1138 30273 389,430.00 2,750.00 141.61 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1132 30360 389,780.00 2,750.00 141.74 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1143 30294 392,460.00 2,750.00 142.71 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1139 30817 386,310.00 2,750.00 140.48 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1133 30299 324,060.00 2,750.00 117.84 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1158 30273 386,980.00 2,750.00 140.72 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1126 30303 287,870.00 2,750.00 104.68 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1128 30303 393,500.00 2,750.00 143.09 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1159 30274 381,380.00 2,750.00 138.68 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1127 30300 287,540.00 2,750.00 104.56 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1129 30300 394,330.00 2,750.00 143.39 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1136 30300 391,010.00 2,750.00 142.19 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1134 30274 391,040.00 2,750.00 142.20 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1156 30294 390,090.00 2,750.00 141.85 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1137 30358 392,460.00 2,750.00 142.71 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1135 30294 389,060.00 2,750.00 141.48 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1157 30358 390,090.00 2,750.00 141.85 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1146 30294 389,440.00 2,750.00 141.61 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1144 30358 392,710.00 2,750.00 142.80 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1146 30303 392,250.00 2,750.00 142.64 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1149 30299 390,870.00 2,750.00 142.13 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1145 30300 390,600.00 2,750.00 142.04 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1147 30360 390,050.00 2,750.00 141.84 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1154 30303 388,870.00 2,750.00 141.41 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1152 30817 384,550.00 2,750.00 139.84 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1150 30274 392,620.00 2,750.00 142.77 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1152 30817 384,550.00 2,750.00 139.84 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1150 30274 392,620.00 2,750.00 142.77 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1155 30299 387,810.00 2,750.00 141.02 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1153 30360 389,030.00 2,750.00 141.47 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1151 30300 389,160.00 2,750.00 141.51 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1142 30274 386,620.00 2,750.00 140.59 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1138 30273 389,430.00 2,750.00 141.61 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1132 30360 389,780.00 2,750.00 141.74 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1143 30294 392,460.00 2,750.00 142.71 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1139 30817 386,310.00 2,750.00 140.48 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1133 30299 324,060.00 2,750.00 117.84 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1158 30273 386,980.00 2,750.00 140.72 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1126 30303 287,870.00 2,750.00 104.68 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1120 30303 393,500.00 2,750.00 143.09 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1159 30274 381,380.00 2,750.00 138.68 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1127 30300 287,540.00 2,750.00 104.56 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1129 30300 394,330.00 2,750.00 143.39 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1162 30303 389,840.00 2,750.00 141.76 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1168 30358 398,730.00 2,750.00 144.99 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1170 30300 393,050.00 2,750.00 142.93 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1163 30360 364,770.00 2,750.00 132.64 1.00 ROCA CAMBIO DE LINEA
9/2/2021 1171 30296 393,050.00 2,750.00 142.93 1.00 ROCA CAMBIO DE LINEA
8/25/2021 1068 30280 8,200.00 2,750.00 2.98 1.00 ROCA CAMBIO DE LINEA
8/25/2021 1070 30273 1,910.00 2,750.00 0.69 1.00 ROCA CAMBIO DE LINEA
8/25/2021 1069 30273 270.00 2,750.00 0.10 1.00 ROCA CAMBIO DE LINEA
8/25/2021 1071 30273 2,100.00 2,750.00 0.76 1.00 ROCA CAMBIO DE LINEA
8/25/2021 1064 30122 6,760.00 2,750.00 2.46 1.00 ROCA CAMBIO DE LINEA
8/25/2021 1066 30243 9,960.00 2,750.00 3.62 1.00 ROCA CAMBIO DE LINEA
8/25/2021 1065 30273 4,650.00 2,750.00 1.69 1.00 ROCA CAMBIO DE LINEA
8/25/2021 1067 30360 7,820.00 2,750.00 2.84 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1059 30360 14,010.00 2,750.00 5.09 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1057 30294 8,330.00 2,750.00 3.03 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1060 30243 15,760.00 2,750.00 5.73 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1058 30303 7,970.00 2,750.00 2.90 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1063 30280 70,390.00 2,750.00 25.60 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1061 30273 17,040.00 2,750.00 6.20 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1062 30294 9,520.00 2,750.00 3.46 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1053 30303 5,790.00 2,750.00 2.11 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1055 30122 7,910.00 2,750.00 2.88 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1054 30243 14,110.00 2,750.00 5.13 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1056 30280 1,540.00 2,750.00 0.56 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1045 30360 6,050.00 2,750.00 2.20 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1051 30294 11,760.00 2,750.00 4.28 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1046 30294 2,580.00 2,750.00 0.94 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1052 30360 16,730.00 2,750.00 6.08 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1049 30243 7,030.00 2,750.00 2.56 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1047 30303 3,100.00 2,750.00 1.13 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1050 30273 125,000.00 2,750.00 45.45 1.00 ROCA CAMBIO DE LINEA
8/24/2021 1048 30273 4,520.00 2,750.00 1.64 1.00 ROCA CAMBIO DE LINEA
8/26/2021 1072 30360 2,000.00 2,750.00 0.73 1.00 ROCA CAMBIO DE LINEA
8/26/2021 1073 30294 37,620.00 2,750.00 13.68 1.00 ROCA CAMBIO DE LINEA
8/23/2021 1043 30294 8,290.00 2,750.00 3.01 1.00 ROCA CAMBIO DE LINEA
8/23/2021 1044 30303 6,050.00 2,750.00 2.20 1.00 ROCA CAMBIO DE LINEA
8/23/2021 1039 30294 6,810.00 2,750.00 2.48 1.00 ROCA CAMBIO DE LINEA
8/23/2021 1041 30360 9,360.00 2,750.00 3.40 1.00 ROCA CAMBIO DE LINEA
8/23/2021 1040 30243 7,040.00 2,750.00 2.56 1.00 ROCA CAMBIO DE LINEA
8/23/2021 1042 30273 6,810.00 2,750.00 2.48 1.00 ROCA CAMBIO DE LINEA
8/23/2021 1031 30360 7,740.00 2,750.00 2.81 1.00 ROCA CAMBIO DE LINEA
8/23/2021 1035 30243 7,190.00 2,750.00 2.61 1.00 ROCA CAMBIO DE LINEA
8/23/2021 1032 30303 3,660.00 2,750.00 1.33 1.00 ROCA CAMBIO DE LINEA
8/23/2021 1036 30360 10,770.00 2,750.00 3.92 1.00 ROCA CAMBIO DE LINEA
8/22/2021 1028 30360 10,270.00 2,750.00 3.73 1.00 ROCA CAMBIO DE LINEA
8/22/2021 1030 30303 6,590.00 2,750.00 2.40 1.00 ROCA CAMBIO DE LINEA
8/22/2021 1029 30273 8,090.00 2,750.00 2.94 1.00 ROCA CAMBIO DE LINEA
8/22/2021 1024 30294 25,590.00 2,750.00 9.31 1.00 ROCA CAMBIO DE LINEA
8/22/2021 1026 30360 10,650.00 2,750.00 3.87 1.00 ROCA CAMBIO DE LINEA
8/22/2021 1025 30303 7,770.00 2,750.00 2.83 1.00 ROCA CAMBIO DE LINEA
8/22/2021 1027 30294 7,040.00 2,750.00 2.56 1.00 ROCA CAMBIO DE LINEA
8/22/2021 1018 30360 4,220.00 2,750.00 1.53 1.00 ROCA CAMBIO DE LINEA
8/22/2021 1020 30343 7,450.00 2,750.00 2.71 1.00 ROCA CAMBIO DE LINEA
8/22/2021 1022 30303 7,630.00 2,750.00 2.77 1.00 ROCA CAMBIO DE LINEA
8/22/2021 1019 30294 2,090.00 2,750.00 0.76 1.00 ROCA CAMBIO DE LINEA
8/21/2021 1021 30273 6,840.00 2,750.00 2.49 1.00 ROCA CAMBIO DE LINEA
8/21/2021 1023 30273 9,670.00 2,750.00 3.52 1.00 ROCA CAMBIO DE LINEA
8/21/2021 1002 30243 4,650.00 2,750.00 1.69 1.00 ROCA CAMBIO DE LINEA
8/21/2021 1004 30294 4,590.00 2,750.00 1.67 1.00 ROCA CAMBIO DE LINEA
8/21/2021 1006 30303 730.00 2,750.00 0.27 1.00 ROCA CAMBIO DE LINEA
8/21/2021 1003 30273 45,450.00 2,750.00 16.53 1.00 ROCA CAMBIO DE LINEA
8/21/2021 1005 30360 2,300.00 2,750.00 0.84 1.00 ROCA CAMBIO DE LINEA
8/21/2021 1007 30360 1,430.00 2,750.00 0.52 1.00 ROCA CAMBIO DE LINEA
8/23/2021 1033 30273 4,380.00 2,750.00 1.59 1.00 ROCA CAMBIO DE LINEA
8/23/2021 1037 30303 9,540.00 2,750.00 3.47 1.00 ROCA CAMBIO DE LINEA
8/23/2021 1034 30294 5,240.00 2,750.00 1.91 1.00 ROCA CAMBIO DE LINEA
8/23/2021 1038 30273 13,410.00 2,750.00 4.88 1.00 ROCA CAMBIO DE LINEA
8/20/2021 991 30360 4,970.00 2,750.00 1.81 1.00 ROCA CAMBIO DE LINEA
8/20/2021 992 30243 6,230.00 2,750.00 2.27 1.00 ROCA CAMBIO DE LINEA
8/20/2021 997 30303 230.00 2,750.00 0.08 1.00 ROCA CAMBIO DE LINEA
8/20/2021 992 30243 6,230.00 2,750.00 2.27 1.00 ROCA CAMBIO DE LINEA
8/20/2021 995 30360 20,240.00 2,750.00 7.36 1.00 ROCA CAMBIO DE LINEA
8/20/2021 998 30303 3,950.00 2,750.00 1.44 1.00 ROCA CAMBIO DE LINEA
8/20/2021 1000 30243 5,940.00 2,750.00 2.16 1.00 ROCA CAMBIO DE LINEA
8/21/2021 1016 30360 10,370.00 2,750.00 3.77 1.00 ROCA CAMBIO DE LINEA
8/20/2021 999 30373 7,810.00 2,750.00 2.84 1.00 ROCA CAMBIO DE LINEA
8/20/2021 1001 30303 5,800.00 2,750.00 2.11 1.00 ROCA CAMBIO DE LINEA
7/10/2021 957 30302 3,170.00 2,750.00 1.15 1.00 ROCA CAMBIO DE LINEA
7/10/2021 959 30358 1,250.00 2,750.00 0.45 1.00 ROCA CAMBIO DE LINEA
7/10/2021 961 30302 4,710.00 2,750.00 1.71 1.00 ROCA CAMBIO DE LINEA
7/10/2021 958 30274 1,440.00 2,750.00 0.52 1.00 ROCA CAMBIO DE LINEA
7/10/2021 960 30133 3,340.00 2,750.00 1.21 1.00 ROCA CAMBIO DE LINEA
7/10/2021 962 30300 4,920.00 2,750.00 1.79 1.00 ROCA CAMBIO DE LINEA
7/10/2021 973 30294 14,910.00 2,750.00 5.42 1.00 ROCA CAMBIO DE LINEA
7/11/2021 976 30275 1,580.00 2,750.00 0.57 1.00 ROCA CAMBIO DE LINEA
7/10/2021 975 30300 12,410.00 2,750.00 4.51 1.00 ROCA CAMBIO DE LINEA
7/11/2021 977 30294 1,790.00 2,750.00 0.65 1.00 ROCA CAMBIO DE LINEA
7/10/2021 963 30302 2,680.00 2,750.00 0.97 1.00 ROCA CAMBIO DE LINEA
7/10/2021 965 30274 2,620.00 2,750.00 0.95 1.00 ROCA CAMBIO DE LINEA
7/10/2021 967 30300 17,250.00 2,750.00 6.27 1.00 ROCA CAMBIO DE LINEA
7/10/2021 964 30294 3,140.00 2,750.00 1.14 1.00 ROCA CAMBIO DE LINEA
7/10/2021 966 30299 12,990.00 2,750.00 4.72 1.00 ROCA CAMBIO DE LINEA
7/10/2021 968 30294 10,260.00 2,750.00 3.73 1.00 ROCA CAMBIO DE LINEA
7/10/2021 970 30299 13,430.00 2,750.00 4.88 1.00 ROCA CAMBIO DE LINEA
7/22/2021 978 30365 1,770.00 2,750.00 0.64 1.00 ROCA CAMBIO DE LINEA
7/22/2021 980 30365 7,690.00 2,750.00 2.80 1.00 ROCA CAMBIO DE LINEA
7/10/2021 971 30300 15,040.00 2,750.00 5.47 1.00 ROCA CAMBIO DE LINEA
7/22/2021 979 30296 1,900.00 2,750.00 0.69 1.00 ROCA CAMBIO DE LINEA
7/22/2021 981 30296 9,310.00 2,750.00 3.39 1.00 ROCA CAMBIO DE LINEA
7/9/2021 925 30300 1,530.00 2,750.00 0.56 1.00 ROCA CAMBIO DE LINEA
7/9/2021 927 30365 3,180.00 2,750.00 1.16 1.00 ROCA CAMBIO DE LINEA
7/9/2021 929 30358 380.00 2,750.00 0.14 1.00 ROCA CAMBIO DE LINEA
7/9/2021 926 30302 9,740.00 2,750.00 3.54 1.00 ROCA CAMBIO DE LINEA
7/9/2021 928 30296 3,450.00 2,750.00 1.25 1.00 ROCA CAMBIO DE LINEA
7/9/2021 930 30274 240.00 2,750.00 0.09 1.00 ROCA CAMBIO DE LINEA
7/9/2021 931 3133 240.00 2,750.00 0.09 1.00 ROCA CAMBIO DE LINEA
7/9/2021 933 30294 5,150.00 2,750.00 1.87 1.00 ROCA CAMBIO DE LINEA
7/9/2021 935 30302 1,380.00 2,750.00 0.50 1.00 ROCA CAMBIO DE LINEA
7/9/2021 932 30299 520.00 2,750.00 0.19 1.00 ROCA CAMBIO DE LINEA
7/9/2021 934 30275 1,210.00 2,750.00 0.44 1.00 ROCA CAMBIO DE LINEA
7/9/2021 936 30365 300.00 2,750.00 0.11 1.00 ROCA CAMBIO DE LINEA
7/9/2021 937 30296 1,480.00 2,750.00 0.54 1.00 ROCA CAMBIO DE LINEA
7/9/2021 938 30358 660.00 2,750.00 0.24 1.00 ROCA CAMBIO DE LINEA
7/9/2021 941 30274 1,710.00 2,750.00 0.62 1.00 ROCA CAMBIO DE LINEA
7/9/2021 942 30133 1,920.00 2,750.00 0.70 1.00 ROCA CAMBIO DE LINEA
7/9/2021 943 30302 2,460.00 2,750.00 0.89 1.00 ROCA CAMBIO DE LINEA
7/9/2021 944 30365 5,440.00 2,750.00 1.98 1.00 ROCA CAMBIO DE LINEA
7/9/2021 949 30274 2,070.00 2,750.00 0.75 1.00 ROCA CAMBIO DE LINEA
7/9/2021 949 30274 2,070.00 2,750.00 0.75 1.00 ROCA CAMBIO DE LINEA
7/9/2021 951 30302 2,620.00 2,750.00 0.95 1.00 ROCA CAMBIO DE LINEA
7/9/2021 953 30274 3,700.00 2,750.00 1.35 1.00 ROCA CAMBIO DE LINEA
7/9/2021 950 30133 1,780.00 2,750.00 0.65 1.00 ROCA CAMBIO DE LINEA
7/9/2021 952 30365 4,160.00 2,750.00 1.51 1.00 ROCA CAMBIO DE LINEA
7/9/2021 954 30296 3,700.00 2,750.00 1.35 1.00 ROCA CAMBIO DE LINEA
7/9/2021 939 30299 1,880.00 2,750.00 0.68 1.00 ROCA CAMBIO DE LINEA
7/9/2021 945 30294 980.00 2,750.00 0.36 1.00 ROCA CAMBIO DE LINEA
7/9/2021 947 30358 1,390.00 2,750.00 0.51 1.00 ROCA CAMBIO DE LINEA
7/9/2021 940 30275 32,620.00 2,750.00 11.86 1.00 ROCA CAMBIO DE LINEA
7/9/2021 946 30296 1,570.00 2,750.00 0.57 1.00 ROCA CAMBIO DE LINEA
7/9/2021 948 30275 2,290.00 2,750.00 0.83 1.00 ROCA CAMBIO DE LINEA
7/8/2021 915 30300 6,390.00 2,750.00 2.32 1.00 ROCA CAMBIO DE LINEA
7/8/2021 917 30133 4,310.00 2,750.00 1.57 1.00 ROCA CAMBIO DE LINEA
7/8/2021 919 30274 140.00 2,750.00 0.05 1.00 ROCA CAMBIO DE LINEA
7/8/2021 916 30133 12,600.00 2,750.00 4.58 1.00 ROCA CAMBIO DE LINEA
7/8/2021 918 30294 4,500.00 2,750.00 1.64 1.00 ROCA CAMBIO DE LINEA
7/8/2021 920 30358 3,670.00 2,750.00 1.33 1.00 ROCA CAMBIO DE LINEA
7/8/2021 921 30274 1,420.00 2,750.00 0.52 1.00 ROCA CAMBIO DE LINEA
7/8/2021 923 30302 3,560.00 2,750.00 1.29 1.00 ROCA CAMBIO DE LINEA
7/8/2021 955 30133 2,560.00 2,750.00 0.93 1.00 ROCA CAMBIO DE LINEA
7/8/2021 922 30294 3,270.00 2,750.00 1.19 1.00 ROCA CAMBIO DE LINEA
7/8/2021 924 30358 3,330.00 2,750.00 1.21 1.00 ROCA CAMBIO DE LINEA
7/8/2021 956 30302 3,160.00 2,750.00 1.15 1.00 ROCA CAMBIO DE LINEA
7/7/2021 902 30299 2,170.00 2,750.00 0.79 1.00 ROCA CAMBIO DE LINEA
7/7/2021 904 30275 16,010.00 2,750.00 5.82 1.00 ROCA CAMBIO DE LINEA
7/7/2021 906 30296 24,040.00 2,750.00 8.74 1.00 ROCA CAMBIO DE LINEA
7/7/2021 903 30302 26,700.00 2,750.00 9.71 1.00 ROCA CAMBIO DE LINEA
7/7/2021 905 30294 5,630.00 2,750.00 2.05 1.00 ROCA CAMBIO DE LINEA
7/7/2021 907 30133 23,380.00 2,750.00 8.50 1.00 ROCA CAMBIO DE LINEA
7/7/2021 896 30299 22,830.00 2,750.00 8.30 1.00 ROCA CAMBIO DE LINEA
7/7/2021 898 30302 31,410.00 2,750.00 11.42 1.00 ROCA CAMBIO DE LINEA
7/7/2021 900 30296 72,650.00 2,750.00 26.42 1.00 ROCA CAMBIO DE LINEA
7/7/2021 897 30358 58,920.00 2,750.00 21.43 1.00 ROCA CAMBIO DE LINEA
7/7/2021 899 30113 72,650.00 2,750.00 26.42 1.00 ROCA CAMBIO DE LINEA
7/7/2021 901 30274 20,270.00 2,750.00 7.37 1.00 ROCA CAMBIO DE LINEA
7/7/2021 908 30299 9,120.00 2,750.00 3.32 1.00 ROCA CAMBIO DE LINEA
7/7/2021 830 30299 4,290.00 2,750.00 1.56 1.00 ROCA CAMBIO DE LINEA
7/7/2021 910 30133 2,220.00 2,750.00 0.81 1.00 ROCA CAMBIO DE LINEA
7/7/2021 909 30294 22,280.00 2,750.00 8.10 1.00 ROCA CAMBIO DE LINEA
7/7/2021 911 30302 15,880.00 2,750.00 5.77 1.00 ROCA CAMBIO DE LINEA
7/7/2021 911 30302 15,880.00 2,750.00 5.77 1.00 ROCA CAMBIO DE LINEA
7/7/2021 890 30358 15,840.00 2,750.00 5.76 1.00 ROCA CAMBIO DE LINEA
7/7/2021 892 30294 13,180.00 2,750.00 4.79 1.00 ROCA CAMBIO DE LINEA
7/7/2021 894 30275 53,650.00 2,750.00 19.51 1.00 ROCA CAMBIO DE LINEA
7/7/2021 891 30299 44,530.00 2,750.00 16.19 1.00 ROCA CAMBIO DE LINEA
7/7/2021 893 30133 23,440.00 2,750.00 8.52 1.00 ROCA CAMBIO DE LINEA
7/7/2021 895 30296 75,360.00 2,750.00 27.40 1.00 ROCA CAMBIO DE LINEA
7/6/2021 887 30133 13,250.00 2,750.00 4.82 1.00 ROCA CAMBIO DE LINEA
7/6/2021 889 30302 54,160.00 2,750.00 19.69 1.00 ROCA CAMBIO DE LINEA
7/6/2021 888 30358 17,550.00 2,750.00 6.38 1.00 ROCA CAMBIO DE LINEA
7/10/2021 969 30274 10,360.00 2,750.00 3.77 1.00 ROCA CAMBIO DE LINEA
7/10/2021 972 30302 24,940.00 2,750.00 9.07 1.00 ROCA CAMBIO DE LINEA
5/19/2021 173 30300 46,210.00 2,750.00 16.80 1.00 ROCA CAMBIO DE LINEA
5/19/2021 172 30274 135,590.00 2,750.00 49.31 1.00 ROCA CAMBIO DE LINEA
5/19/2021 174 30299 45,080.00 2,750.00 16.39 1.00 ROCA CAMBIO DE LINEA
5/19/2021 172 30274 135,590.00 2,750.00 49.31 1.00 ROCA CAMBIO DE LINEA
5/19/2021 168 30274 4,070.00 2,750.00 1.48 1.00 ROCA CAMBIO DE LINEA
5/19/2021 167 30294 51,140.00 2,750.00 18.60 1.00 ROCA CAMBIO DE LINEA
5/19/2021 169 30302 37,510.00 2,750.00 13.64 1.00 ROCA CAMBIO DE LINEA
5/19/2021 161 30274 44,340.00 2,750.00 16.12 1.00 ROCA CAMBIO DE LINEA
5/18/2021 135 30358 38,740.00 2,750.00 14.09 1.00 ROCA CAMBIO DE LINEA
5/18/2021 112 30300 62,580.00 2,750.00 22.76 1.00 ROCA CAMBIO DE LINEA
5/18/2021 144 30365 87,270.00 2,750.00 31.73 1.00 ROCA CAMBIO DE LINEA
5/18/2021 116 30275 70,900.00 2,750.00 25.78 1.00 ROCA CAMBIO DE LINEA
5/18/2021 133 30296 48,650.00 2,750.00 17.69 1.00 ROCA CAMBIO DE LINEA
5/18/2021 150 30358 46,510.00 2,750.00 16.91 1.00 ROCA CAMBIO DE LINEA
5/18/2021 134 30299 54,780.00 2,750.00 19.92 1.00 ROCA CAMBIO DE LINEA
5/18/2021 136 30275 43,750.00 2,750.00 15.91 1.00 ROCA CAMBIO DE LINEA
5/18/2021 127 30299 46,450.00 2,750.00 16.89 1.00 ROCA CAMBIO DE LINEA
5/18/2021 129 30274 76,610.00 2,750.00 27.86 1.00 ROCA CAMBIO DE LINEA
5/18/2021 128 30296 26,240.00 2,750.00 9.54 1.00 ROCA CAMBIO DE LINEA
5/18/2021 148 30296 25,740.00 2,750.00 9.36 1.00 ROCA CAMBIO DE LINEA
5/18/2021 131 30365 59,030.00 2,750.00 21.47 1.00 ROCA CAMBIO DE LINEA
5/18/2021 149 30302 88,070.00 2,750.00 32.03 1.00 ROCA CAMBIO DE LINEA
5/18/2021 130 30300 72,150.00 2,750.00 26.24 1.00 ROCA CAMBIO DE LINEA
5/18/2021 132 30302 23,610.00 2,750.00 8.59 1.00 ROCA CAMBIO DE LINEA
5/18/2021 139 30299 97,780.00 2,750.00 35.56 1.00 ROCA CAMBIO DE LINEA
5/18/2021 124 30358 46,180.00 2,750.00 16.79 1.00 ROCA CAMBIO DE LINEA
5/18/2021 141 30275 37,110.00 2,750.00 13.49 1.00 ROCA CAMBIO DE LINEA
5/18/2021 123 30275 20,910.00 2,750.00 7.60 1.00 ROCA CAMBIO DE LINEA
5/18/2021 118 30296 23,150.00 2,750.00 8.42 1.00 ROCA CAMBIO DE LINEA
5/18/2021 126 30365 38,980.00 2,750.00 14.17 1.00 ROCA CAMBIO DE LINEA
5/18/2021 117 30302 64,040.00 2,750.00 23.29 1.00 ROCA CAMBIO DE LINEA
5/18/2021 140 30274 44,950.00 2,750.00 16.35 1.00 ROCA CAMBIO DE LINEA
5/18/2021 122 30274 30,420.00 2,750.00 11.06 1.00 ROCA CAMBIO DE LINEA
5/18/2021 120 30300 52,250.00 2,750.00 19.00 1.00 ROCA CAMBIO DE LINEA
5/18/2021 121 30294 47,710.00 2,750.00 17.35 1.00 ROCA CAMBIO DE LINEA
5/18/2021 119 30299 63,380.00 2,750.00 23.05 1.00 ROCA CAMBIO DE LINEA
5/18/2021 142 30302 75,000.00 2,750.00 27.27 1.00 ROCA CAMBIO DE LINEA
5/18/2021 145 30300 68,420.00 2,750.00 24.88 1.00 ROCA CAMBIO DE LINEA
5/18/2021 147 30275 53,350.00 2,750.00 19.40 1.00 ROCA CAMBIO DE LINEA
5/18/2021 143 30358 37,410.00 2,750.00 13.60 1.00 ROCA CAMBIO DE LINEA
5/18/2021 152 30300 71,650.00 2,750.00 26.05 1.00 ROCA CAMBIO DE LINEA
5/18/2021 138 30296 22,840.00 2,750.00 8.31 1.00 ROCA CAMBIO DE LINEA
5/18/2021 152 30300 71,650.00 2,750.00 26.05 1.00 ROCA CAMBIO DE LINEA
5/18/2021 151 30299 26,500.00 2,750.00 9.64 1.00 ROCA CAMBIO DE LINEA
5/18/2021 137 30300 52,830.00 2,750.00 19.21 1.00 ROCA CAMBIO DE LINEA
5/18/2021 152 30300 71,650.00 2,750.00 26.05 1.00 ROCA CAMBIO DE LINEA
5/16/2021 71 30302 58,870.00 2,750.00 21.41 1.00 ROCA CAMBIO DE LINEA
5/16/2021 79 30294 33,500.00 2,750.00 12.18 1.00 ROCA CAMBIO DE LINEA
5/16/2021 69 30299 21,870.00 2,750.00 7.95 1.00 ROCA CAMBIO DE LINEA
5/16/2021 72 30275 88,950.00 2,750.00 32.35 1.00 ROCA CAMBIO DE LINEA
5/16/2021 73 30294 39,170.00 2,750.00 14.24 1.00 ROCA CAMBIO DE LINEA
5/16/2021 82 30274 76,090.00 2,750.00 27.67 1.00 ROCA CAMBIO DE LINEA
5/16/2021 84 30275 32,300.00 2,750.00 11.75 1.00 ROCA CAMBIO DE LINEA
5/16/2021 74 30299 69,800.00 2,750.00 25.38 1.00 ROCA CAMBIO DE LINEA
5/16/2021 68 30365 60,890.00 2,750.00 22.14 1.00 ROCA CAMBIO DE LINEA
5/16/2021 75 30296 30,670.00 2,750.00 11.15 1.00 ROCA CAMBIO DE LINEA
5/16/2021 76 30274 39,300.00 2,750.00 14.29 1.00 ROCA CAMBIO DE LINEA
5/16/2021 77 30300 19,020.00 2,750.00 6.92 1.00 ROCA CAMBIO DE LINEA
5/16/2021 80 30296 39,760.00 2,750.00 14.46 1.00 ROCA CAMBIO DE LINEA
5/16/2021 78 30275 28,380.00 2,750.00 10.32 1.00 ROCA CAMBIO DE LINEA
5/16/2021 70 30300 32,020.00 2,750.00 11.64 1.00 ROCA CAMBIO DE LINEA
5/16/2021 81 30299 40,560.00 2,750.00 14.75 1.00 ROCA CAMBIO DE LINEA
5/16/2021 85 30299 21,080.00 2,750.00 7.67 1.00 ROCA CAMBIO DE LINEA
5/16/2021 83 30300 68,970.00 2,750.00 25.08 1.00 ROCA CAMBIO DE LINEA
5/17/2021 111 30275 41,960.00 2,750.00 15.26 1.00 ROCA CAMBIO DE LINEA
5/15/2021 49 30300 39,250.00 2,750.00 14.27 1.00 ROCA CAMBIO DE LINEA
5/15/2021 45 30299 50,730.00 2,750.00 18.45 1.00 ROCA CAMBIO DE LINEA
5/15/2021 65 30365 61,020.00 2,750.00 22.19 1.00 ROCA CAMBIO DE LINEA
5/15/2021 67 30300 34,910.00 2,750.00 12.69 1.00 ROCA CAMBIO DE LINEA
5/15/2021 58 30275 55,210.00 2,750.00 20.08 1.00 ROCA CAMBIO DE LINEA
5/15/2021 47 30302 18,610.00 2,750.00 6.77 1.00 ROCA CAMBIO DE LINEA
5/15/2021 46 30275 36,950.00 2,750.00 13.44 1.00 ROCA CAMBIO DE LINEA
5/15/2021 47 30302 18,610.00 2,750.00 6.77 1.00 ROCA CAMBIO DE LINEA
5/15/2021 51 30358 55,040.00 2,750.00 20.01 1.00 ROCA CAMBIO DE LINEA
5/15/2021 66 30274 55,110.00 2,750.00 20.04 1.00 ROCA CAMBIO DE LINEA
5/15/2021 50 30274 3,830.00 2,750.00 1.39 1.00 ROCA CAMBIO DE LINEA
5/15/2021 64 30275 84,340.00 2,750.00 30.67 1.00 ROCA CAMBIO DE LINEA
5/15/2021 62 30302 94,260.00 2,750.00 34.28 1.00 ROCA CAMBIO DE LINEA
5/15/2021 60 30274 2,950.00 2,750.00 1.07 1.00 ROCA CAMBIO DE LINEA
5/15/2021 63 30299 81,930.00 2,750.00 29.79 1.00 ROCA CAMBIO DE LINEA
5/15/2021 61 30358 15,750.00 2,750.00 5.73 1.00 ROCA CAMBIO DE LINEA
5/15/2021 54 30300 117,490.00 2,750.00 42.72 1.00 ROCA CAMBIO DE LINEA
5/15/2021 52 30299 77,720.00 2,750.00 28.26 1.00 ROCA CAMBIO DE LINEA
5/15/2021 53 30275 46,910.00 2,750.00 17.06 1.00 ROCA CAMBIO DE LINEA
5/15/2021 62 30302 94,260.00 2,750.00 34.28 1.00 ROCA CAMBIO DE LINEA
5/15/2021 60 30274 2,950.00 2,750.00 1.07 1.00 ROCA CAMBIO DE LINEA
5/15/2021 63 30299 81,930.00 2,750.00 29.79 1.00 ROCA CAMBIO DE LINEA
5/15/2021 61 30358 15,750.00 2,750.00 5.73 1.00 ROCA CAMBIO DE LINEA
5/15/2021 54 30300 117,490.00 2,750.00 42.72 1.00 ROCA CAMBIO DE LINEA
5/15/2021 52 30299 77,720.00 2,750.00 28.26 1.00 ROCA CAMBIO DE LINEA
5/15/2021 53 30275 46,910.00 2,750.00 17.06 1.00 ROCA CAMBIO DE LINEA
5/15/2021 48 30365 71,510.00 2,750.00 26.00 1.00 ROCA CAMBIO DE LINEA
5/15/2021 55 30358 44,950.00 2,750.00 16.35 1.00 ROCA CAMBIO DE LINEA
5/15/2021 57 30965 100,120.00 2,750.00 36.41 1.00 ROCA CAMBIO DE LINEA
5/15/2021 56 30274 59,830.00 2,750.00 21.76 1.00 ROCA CAMBIO DE LINEA
5/14/2021 43 30300 244,390.00 2,750.00 88.87 1.00 ROCA CAMBIO DE LINEA
5/14/2021 44 30299 64,520.00 2,750.00 23.46 1.00 ROCA CAMBIO DE LINEA
5/11/2021 26 30358 17,120.00 2,750.00 6.23 1.00 ROCA CAMBIO DE LINEA
5/11/2021 27 30296 51,840.00 2,750.00 18.85 1.00 ROCA CAMBIO DE LINEA
5/11/2021 25 30275 26,370.00 2,750.00 9.59 1.00 ROCA CAMBIO DE LINEA
5/17/2021 111 30275 41,960.00 2,750.00 15.26 1.00 ROCA CAMBIO DE LINEA
5/17/2021 110 30274 67,400.00 2,750.00 24.51 1.00 ROCA CAMBIO DE LINEA
5/17/2021 109 30294 50,010.00 2,750.00 18.19 1.00 ROCA CAMBIO DE LINEA
5/17/2021 107 30365 50,990.00 2,750.00 18.54 1.00 ROCA CAMBIO DE LINEA
5/17/2021 108 30133 50,010.00 2,750.00 18.19 1.00 ROCA CAMBIO DE LINEA
5/17/2021 106 30300 42,370.00 2,750.00 15.41 1.00 ROCA CAMBIO DE LINEA
5/17/2021 105 30299 56,030.00 2,750.00 20.37 1.00 ROCA CAMBIO DE LINEA
5/17/2021 104 30296 45,980.00 2,750.00 16.72 1.00 ROCA CAMBIO DE LINEA
5/17/2021 103 30275 36,410.00 2,750.00 13.24 1.00 ROCA CAMBIO DE LINEA
5/17/2021 102 30358 26,240.00 2,750.00 9.54 1.00 ROCA CAMBIO DE LINEA
5/17/2021 101 30274 23,140.00 2,750.00 8.41 1.00 ROCA CAMBIO DE LINEA
5/17/2021 100 30302 70,520.00 2,750.00 25.64 1.00 ROCA CAMBIO DE LINEA
5/17/2021 97 30299 29,280.00 2,750.00 10.65 1.00 ROCA CAMBIO DE LINEA
5/17/2021 96 30275 95,890.00 2,750.00 34.87 1.00 ROCA CAMBIO DE LINEA
5/17/2021 99 30300 40,160.00 2,750.00 14.60 1.00 ROCA CAMBIO DE LINEA
5/17/2021 98 30296 37,860.00 2,750.00 13.77 1.00 ROCA CAMBIO DE LINEA
5/17/2021 95 30365 55,000.00 2,750.00 20.00 1.00 ROCA CAMBIO DE LINEA
5/17/2021 94 30294 65,550.00 2,750.00 23.84 1.00 ROCA CAMBIO DE LINEA
5/17/2021 92 30358 38,400.00 2,750.00 13.96 1.00 ROCA CAMBIO DE LINEA
5/17/2021 91 30302 44,620.00 2,750.00 16.23 1.00 ROCA CAMBIO DE LINEA
5/17/2021 89 30299 60,540.00 2,750.00 22.01 1.00 ROCA CAMBIO DE LINEA
5/17/2021 88 30275 37,060.00 2,750.00 13.48 1.00 ROCA CAMBIO DE LINEA
5/17/2021 87 30296 54,130.00 2,750.00 19.68 1.00 ROCA CAMBIO DE LINEA
5/17/2021 86 30365 30,820.00 2,750.00 11.21 1.00 ROCA CAMBIO DE LINEA
82,655,875.00 30,058.66 483.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
3/9/2022 4679 30300 16,560.00 2,750.00 6.02
3/9/2022 4680 30365 17,440.00 2,750.00 6.34
3/9/2022 4681 30303 22,270.00 2,750.00 8.10
3/9/2022 4682 30296 16,330.00 2,750.00 5.94
3/9/2022 4683 30299 18,130.00 2,750.00 6.59
3/9/2022 4684 30275 15,630.00 2,750.00 5.68
3/9/2022 4685 30273 12,700.00 2,750.00 4.62
3/9/2022 4686 30300 16,180.00 2,750.00 5.88
3/9/2022 4687 30133 14,770.00 2,750.00 5.37
3/9/2022 4688 30365 15,930.00 2,750.00 5.79
3/9/2022 4689 30294 17,780.00 2,750.00 6.47
3/9/2022 4690 30273 14,850.00 2,750.00 5.40
3/9/2022 4691 30364 18,130.00 2,750.00 6.59
3/9/2022 4692 30360 11,950.00 2,750.00 4.35
3/9/2022 4693 30274 15,600.00 2,750.00 5.67
3/9/2022 4694 30296 20,470.00 2,750.00 7.44
3/9/2022 4695 30294 15,660.00 2,750.00 5.69
3/9/2022 4696 30493 10,210.00 2,750.00 3.71
3/9/2022 4697 30275 16,900.00 2,750.00 6.15
3/9/2022 4698 30300 13,390.00 2,750.00 4.87
3/9/2022 4699 30133 10,910.00 2,750.00 3.97
3/9/2022 4700 30296 21,220.00 2,750.00 7.72
3/9/2022 4701 30273 16,450.00 2,750.00 5.98
3/9/2022 4702 30303 18,620.00 2,750.00 6.77
3/9/2022 4703 30299 15,050.00 2,750.00 5.47
3/10/2022 4704 30303 20,110.00 2,750.00 7.31
3/10/2022 4705 30133 10,400.00 2,750.00 3.78
3/10/2022 4706 30299 17,270.00 2,750.00 6.28
3/10/2022 4707 30294 18,440.00 2,750.00 6.71
3/10/2022 4708 30296 17,600.00 2,750.00 6.40
3/10/2022 4709 30273 18,200.00 2,750.00 6.62
3/10/2022 4710 30275 19,810.00 2,750.00 7.20
3/10/2022 4711 30300 16,310.00 2,750.00 5.93
3/10/2022 4712 30365 15,340.00 2,750.00 5.58
3/10/2022 4713 30303 17,990.00 2,750.00 6.54
3/10/2022 4714 30299 19,430.00 2,750.00 7.07
3/10/2022 4715 30296 16,770.00 2,750.00 6.10
3/10/2022 4716 30275 21,000.00 2,750.00 7.64
3/10/2022 4717 30294 14,750.00 2,750.00 5.36
3/10/2022 4718 30133 11,690.00 2,750.00 4.25
3/10/2022 4719 30273 14,960.00 2,750.00 5.44
3/10/2022 4720 30300 16,890.00 2,750.00 6.14
3/10/2022 4721 30365 15,280.00 2,750.00 5.56
3/10/2022 4722 30303 16,770.00 2,750.00 6.10
3/10/2022 4723 30299 17,420.00 2,750.00 6.33
3/10/2022 4724 30296 15,250.00 2,750.00 5.55
3/10/2022 4725 30275 19,610.00 2,750.00 7.13
3/10/2022 4726 30133 10,740.00 2,750.00 3.91
3/10/2022 4727 30300 16,140.00 2,750.00 5.87
3/10/2022 4728 30365 16,010.00 2,750.00 5.82
3/10/2022 4729 30274 3,330.00 2,750.00 1.21
3/10/2022 4730 30294 21,130.00 2,750.00 7.68
3/10/2022 4731 30358 17,670.00 2,750.00 6.43
3/10/2022 4732 30303 17,910.00 2,750.00 6.51
3/10/2022 4733 30273 16,440.00 2,750.00 5.98
3/10/2022 4734 30299 21,750.00 2,750.00 7.91
3/10/2022 4735 30296 16,110.00 2,750.00 5.86
3/10/2022 4736 30275 17,150.00 2,750.00 6.24
3/10/2022 4737 30294 17,670.00 2,750.00 6.43
3/10/2022 4738 30365 17,860.00 2,750.00 6.49
3/10/2022 4739 30300 17,070.00 2,750.00 6.21
3/10/2022 4740 30275 17,590.00 2,750.00 6.40
3/10/2022 4741 30300 15,860.00 2,750.00 5.77
3/10/2022 4742 30294 18,170.00 2,750.00 6.61
3/10/2022 4743 30299 16,490.00 2,750.00 6.00
3/10/2022 4744 30296 16,220.00 2,750.00 5.90
3/10/2022 4745 30365 17,220.00 2,750.00 6.26
3/10/2022 4746 30133 11,400.00 2,750.00 4.15
3/10/2022 4747 30365 20,280.00 2,750.00 7.37
3/7/2022 4532 30299 23,720.00 2,750.00 8.63
3/7/2022 4533 30294 27,000.00 2,750.00 9.82
3/7/2022 4534 30296 18,940.00 2,750.00 6.89
3/7/2022 4535 30273 24,220.00 2,750.00 8.81
3/7/2022 4536 30303 24,070.00 2,750.00 8.75
3/7/2022 4537 30133 13,670.00 2,750.00 4.97
3/7/2022 4538 30299 17,610.00 2,750.00 6.40
3/7/2022 4539 30365 22,320.00 2,750.00 8.12
3/7/2022 4540 30294 18,130.00 2,750.00 6.59
3/7/2022 4541 30296 13,590.00 2,750.00 4.94
3/7/2022 4542 30303 12,630.00 2,750.00 4.59
3/7/2022 4543 30299 13,870.00 2,750.00 5.04
3/7/2022 4544 30273 21,590.00 2,750.00 7.85
3/7/2022 4545 30133 12,680.00 2,750.00 4.61
3/7/2022 4546 30365 15,650.00 2,750.00 5.69
3/7/2022 4547 30364 18,180.00 2,750.00 6.61
3/7/2022 4548 30294 13,950.00 2,750.00 5.07
3/7/2022 4549 30274 18,020.00 2,750.00 6.55
3/7/2022 4550 30296 14,870.00 2,750.00 5.41
3/7/2022 4551 30360 19,750.00 2,750.00 7.18
3/7/2022 4552 30273 15,170.00 2,750.00 5.52
3/7/2022 4553 30303 18,260.00 2,750.00 6.64
3/7/2022 4554 30299 25,710.00 2,750.00 9.35
3/8/2022 4555 30294 17,340.00 2,750.00 6.31
3/8/2022 4556 30303 15,350.00 2,750.00 5.58
3/8/2022 4557 30299 18,080.00 2,750.00 6.57
3/8/2022 4558 30133 13,940.00 2,750.00 5.07
3/8/2022 4559 30296 17,520.00 2,750.00 6.37
3/8/2022 4560 30273 10,720.00 2,750.00 3.90
3/8/2022 4561 30275 19,860.00 2,750.00 7.22
3/8/2022 4563 30364 19,290.00 2,750.00 7.01
3/8/2022 4564 30274 18,680.00 2,750.00 6.79
3/8/2022 4565 30303 14,600.00 2,750.00 5.31
3/8/2022 4566 30294 13,880.00 2,750.00 5.05
3/8/2022 4567 30133 10,680.00 2,750.00 3.88
3/8/2022 4568 30299 15,220.00 2,750.00 5.53
3/8/2022 4569 30273 13,980.00 2,750.00 5.08
3/8/2022 4570 30275 15,350.00 2,750.00 5.58
3/8/2022 4571 30365 15,650.00 2,750.00 5.69
3/8/2022 4572 30296 16,570.00 2,750.00 6.03
3/8/2022 4573 30364 16,370.00 2,750.00 5.95
3/8/2022 4574 30274 15,030.00 2,750.00 5.47
3/8/2022 4575 30299 16,650.00 2,750.00 6.05
3/8/2022 4576 30294 17,590.00 2,750.00 6.40
3/8/2022 4577 30133 11,510.00 2,750.00 4.19
3/8/2022 4578 30275 20,320.00 2,750.00 7.39
3/8/2022 4579 30358 17,250.00 2,750.00 6.27
3/8/2022 4580 30303 16,690.00 2,750.00 6.07
3/8/2022 4581 30273 16,180.00 2,750.00 5.88
3/8/2022 4582 30300 17,050.00 2,750.00 6.20
3/8/2022 4583 30365 18,840.00 2,750.00 6.85
3/8/2022 4584 30296 18,240.00 2,750.00 6.63
3/8/2022 4585 30364 15,240.00 2,750.00 5.54
3/8/2022 4586 30294 17,150.00 2,750.00 6.24
3/8/2022 4587 30299 14,310.00 2,750.00 5.20
3/8/2022 4588 30274 15,620.00 2,750.00 5.68
3/8/2022 4589 30275 17,690.00 2,750.00 6.43
3/8/2022 4590 30303 14,300.00 2,750.00 5.20
3/8/2022 4591 30273 32,600.00 2,750.00 11.85
3/8/2022 4592 30133 11,150.00 2,750.00 4.05
3/8/2022 4593 30364 15,820.00 2,750.00 5.75
3/8/2022 4594 30300 19,060.00 2,750.00 6.93
3/8/2022 4595 30365 24,310.00 2,750.00 8.84
3/8/2022 4596 30483 14,520.00 2,750.00 5.28
3/8/2022 4597 30296 30,294.00 2,750.00 11.02
3/8/2022 4599 30299 20,730.00 2,750.00 7.54
3/8/2022 4600 30275 17,070.00 2,750.00 6.21
3/8/2022 4601 30274 26,290.00 2,750.00 9.56
3/8/2022 4602 30133 11,780.00 2,750.00 4.28
3/8/2022 4603 30364 19,590.00 2,750.00 7.12
3/8/2022 4604 30365 15,330.00 2,750.00 5.57
3/8/2022 4605 30296 19,480.00 2,750.00 7.08
3/8/2022 4606 30273 14,790.00 2,750.00 5.38
3/8/2022 4607 30274 17,830.00 2,750.00 6.48
3/8/2022 4608 30275 20,130.00 2,750.00 7.32
3/8/2022 4609 30364 18,190.00 2,750.00 6.61
3/8/2022 4610 30360 18,560.00 2,750.00 6.75
3/8/2022 4611 30296 16,910.00 2,750.00 6.15
3/8/2022 4612 30365 17,420.00 2,750.00 6.33
3/8/2022 4613 30300 20,350.00 2,750.00 7.40
3/8/2022 4614 30299 17,340.00 2,750.00 6.31
3/8/2022 4615 30273 19,430.00 2,750.00 7.07
3/8/2022 4616 30303 18,480.00 2,750.00 6.72
3/8/2022 4617 30364 14,940.00 2,750.00 5.43
3/8/2022 4618 30299 210.00 2,750.00 0.08
3/8/2022 4619 30294 17,030.00 2,750.00 6.19
3/8/2022 4620 30360 15,860.00 2,750.00 5.77
3/8/2022 4621 30365 19,130.00 2,750.00 6.96
3/8/2022 4622 30275 21,400.00 2,750.00 7.78
3/8/2022 4624 30273 16,000.00 2,750.00 5.82
3/8/2022 4625 30303 17,540.00 2,750.00 6.38
3/8/2022 4626 30274 760.00 2,750.00 0.28
3/8/2022 4627 30133 15,400.00 2,750.00 5.60
3/8/2022 4628 30300 19,270.00 2,750.00 7.01
3/8/2022 4629 30299 16,620.00 2,750.00 6.04
3/8/2022 4630 30358 19,210.00 2,750.00 6.99
3/8/2022 4631 30294 18,410.00 2,750.00 6.69
3/8/2022 4632 30275 19,660.00 2,750.00 7.15
3/8/2022 4633 30364 16,900.00 2,750.00 6.15
3/8/2022 4634 30360 18,540.00 2,750.00 6.74
TOTALES 2,865,304.00 464,750.00 1,041.93
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+101
1.00 Bolon 54+102
1.00 Bolon 54+103
1.00 Bolon 54+104
1.00 Bolon 54+105
1.00 Bolon 54+106
1.00 Bolon 54+107
1.00 Bolon 54+108
1.00 Bolon 54+109
1.00 Bolon 54+110
1.00 Bolon 54+111
1.00 Bolon 54+112
1.00 Bolon 54+113
1.00 Bolon 54+114
1.00 Bolon 54+115
1.00 Bolon 54+116
1.00 Bolon 54+117
1.00 Bolon 54+118
1.00 Bolon 54+119
1.00 Bolon 54+120
1.00 Bolon 54+121
1.00 Bolon 54+122
1.00 Bolon 54+123
1.00 Bolon 54+124
1.00 Bolon 54+125
1.00 Bolon 54+126
1.00 Bolon 54+127
1.00 Bolon 54+128
1.00 Bolon 54+129
1.00 Bolon 54+130
1.00 Bolon 54+131
1.00 Bolon 54+132
1.00 Bolon 54+133
1.00 Bolon 54+134
1.00 Bolon 54+135
1.00 Bolon 54+136
1.00 Bolon 54+137
1.00 Bolon 54+138
1.00 Bolon 54+139
1.00 Bolon 54+140
1.00 Bolon 54+141
1.00 Bolon 54+142
1.00 Bolon 54+143
1.00 Bolon 54+144
1.00 Bolon 54+145
1.00 Bolon 54+146
1.00 Bolon 54+147
1.00 Bolon 54+148
1.00 Bolon 54+149
1.00 Bolon 54+150
1.00 Bolon 54+151
1.00 Bolon 54+152
1.00 Bolon 54+153
1.00 Bolon 54+154
1.00 Bolon 54+155
1.00 Bolon 54+156
1.00 Bolon 54+157
1.00 Bolon 54+158
1.00 Bolon 54+159
1.00 Bolon 54+160
1.00 Bolon 54+161
1.00 Bolon 54+162
1.00 Bolon 54+163
1.00 Bolon 54+164
1.00 Bolon 54+165
1.00 Bolon 54+166
1.00 Bolon 54+167
1.00 Bolon 54+168
1.00 Bolon 54+169
1.00 Bolon 54+170
1.00 Bolon 54+171
169.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
5/24/2022 9689 30300 18,580.00 2,750.00 6.76
5/24/2022 9690 30303 17,750.00 2,750.00 6.45
5/24/2022 9691 30807 16,780.00 2,750.00 6.10
5/24/2022 9692 30299 20,890.00 2,750.00 7.60
5/24/2022 9693 30364 19,830.00 2,750.00 7.21
5/24/2022 9694 30113 11,990.00 2,750.00 4.36
5/24/2022 9695 30365 17,090.00 2,750.00 6.21
5/24/2022 9696 30386 16,010.00 2,750.00 5.82
5/24/2022 9697 30275 19,600.00 2,750.00 7.13
5/24/2022 9698 30243 18,320.00 2,750.00 6.66
5/24/2022 9699 30445 17,570.00 2,750.00 6.39
5/24/2022 9700 30273 17,720.00 2,750.00 6.44
5/24/2022 9701 30360 18,400.00 2,750.00 6.69
5/24/2022 9702 30443 17,680.00 2,750.00 6.43
5/24/2022 9703 30296 17,040.00 2,750.00 6.20
5/24/2022 9704 30122 14,080.00 2,750.00 5.12
5/24/2022 9705 30274 19,410.00 2,750.00 7.06
5/24/2022 9706 30817 15,690.00 2,750.00 5.71
5/24/2022 9707 3096 15,720.00 2,750.00 5.72
5/24/2022 9708 30438 16,810.00 2,750.00 6.11
5/24/2022 9709 30297 19,550.00 2,750.00 7.11
5/24/2022 9710 30300 18,050.00 2,750.00 6.56
5/24/2022 9711 30807 16,850.00 2,750.00 6.13
5/24/2022 9712 30299 18,940.00 2,750.00 6.89
5/24/2022 9713 30303 16,490.00 2,750.00 6.00
5/24/2022 9714 30153 20,810.00 2,750.00 7.57
5/24/2022 9715 30113 9,060.00 2,750.00 3.29
5/24/2022 9716 30364 21,180.00 2,750.00 7.70
5/24/2022 9717 30365 18,340.00 2,750.00 6.67
5/24/2022 9718 30275 16,590.00 2,750.00 6.03
5/24/2022 9719 30144 14,760.00 2,750.00 5.37
5/24/2022 9720 30445 17,690.00 2,750.00 6.43
5/24/2022 9721 30296 19,150.00 2,750.00 6.96
5/24/2022 9722 30273 20,950.00 2,750.00 7.62
5/24/2022 9723 30360 16,880.00 2,750.00 6.14
5/24/2022 9724 30243 19,430.00 2,750.00 7.07
5/24/2022 9725 30125 14,200.00 2,750.00 5.16
5/24/2022 9726 30443 15,370.00 2,750.00 5.59
5/24/2022 9727 30122 13,920.00 2,750.00 5.06
5/24/2022 9728 3096 16,890.00 2,750.00 6.14
5/24/2022 9729 30274 16,280.00 2,750.00 5.92
5/24/2022 9730 30817 14,200.00 2,750.00 5.16
5/24/2022 9731 30807 16,750.00 2,750.00 6.09
5/24/2022 9732 30438 14,640.00 2,750.00 5.32
5/24/2022 9733 30358 18,620.00 2,750.00 6.77
5/24/2022 9734 30297 21,470.00 2,750.00 7.81
5/24/2022 9735 30300 19,390.00 2,750.00 7.05
5/24/2022 9736 30299 20,640.00 2,750.00 7.51
5/24/2022 9737 30113 10,130.00 2,750.00 3.68
5/24/2022 9738 30153 15,170.00 2,750.00 5.52
5/24/2022 9739 30448 15,010.00 2,750.00 5.46
5/24/2022 9740 30364 17,190.00 2,750.00 6.25
5/24/2022 9741 30365 18,280.00 2,750.00 6.65
5/24/2022 9742 30275 18,900.00 2,750.00 6.87
5/24/2022 9743 30144 14,920.00 2,750.00 5.43
5/24/2022 9744 30125 14,880.00 2,750.00 5.41
5/24/2022 9745 30303 450.00 2,750.00 0.16
5/24/2022 9746 30360 17,070.00 2,750.00 6.21
5/24/2022 9747 30303 15,520.00 2,750.00 5.64
5/24/2022 9748 30364 20,180.00 2,750.00 7.34
5/24/2022 9749 30448 15,490.00 2,750.00 5.63
5/24/2022 9750 30274 16,750.00 2,750.00 6.09
5/24/2022 9751 30358 22,440.00 2,750.00 8.16
5/24/2022 9752 30297 19,260.00 2,750.00 7.00
5/24/2022 9753 30817 13,360.00 2,750.00 4.86
5/24/2022 9754 30144 14,570.00 2,750.00 5.30
5/24/2022 9755 30113 10,810.00 2,750.00 3.93
5/24/2022 9756 30153 21,350.00 2,750.00 7.76
5/24/2022 9757 30483 15,190.00 2,750.00 5.52
5/24/2022 9758 30445 18,710.00 2,750.00 6.80
5/24/2022 9759 30299 19,750.00 2,750.00 7.18
5/24/2022 9760 30275 40,130.00 2,750.00 14.59
5/24/2022 9761 30300 19,490.00 2,750.00 7.09
5/24/2022 9762 30122 12,190.00 2,750.00 4.43
5/24/2022 9763 30296 16,290.00 2,750.00 5.92
5/24/2022 9764 30364 18,680.00 2,750.00 6.79
5/24/2022 9765 30360 17,630.00 2,750.00 6.41
5/24/2022 9766 30294 18,470.00 2,750.00 6.72
5/24/2022 9767 30807 17,310.00 2,750.00 6.29
5/24/2022 9768 30193 11,750.00 2,750.00 4.27
5/24/2022 9769 30443 17,440.00 2,750.00 6.34
5/24/2022 9770 30303 16,940.00 2,750.00 6.16
5/24/2022 9771 30297 19,100.00 2,750.00 6.95
5/24/2022 9772 30386 14,670.00 2,750.00 5.33
5/24/2022 9773 30358 20,630.00 2,750.00 7.50
5/24/2022 9774 30274 18,940.00 2,750.00 6.89
5/24/2022 9775 30113 11,620.00 2,750.00 4.23
5/24/2022 9776 30153 17,270.00 2,750.00 6.28
5/24/2022 9777 30296 16,420.00 2,750.00 5.97
5/24/2022 9778 30438 13,540.00 2,750.00 4.92
5/24/2022 9779 30483 12,650.00 2,750.00 4.60
5/24/2022 9780 30122 14,230.00 2,750.00 5.17
5/24/2022 9781 30300 17,430.00 2,750.00 6.34
5/24/2022 9782 30275 18,550.00 2,750.00 6.75
5/24/2022 9783 30373 18,470.00 2,750.00 6.72
5/24/2022 9784 30364 18,990.00 2,750.00 6.91
5/24/2022 9785 30817 14,840.00 2,750.00 5.40
5/24/2022 9786 30243 19,360.00 2,750.00 7.04
5/24/2022 9787 30144 12,260.00 2,750.00 4.46
TOTALES 1,684,720.00 272,250.00 612.63
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
99.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
5/25/2022 9788 30364 19,870.00 2,750.00 7.23
5/25/2022 9789 30448 15,560.00 2,750.00 5.66
5/25/2022 9790 30358 20,570.00 2,750.00 7.48
5/25/2022 9791 30360 19,010.00 2,750.00 6.91
5/25/2022 9792 30445 15,900.00 2,750.00 5.78
5/25/2022 9793 30274 17,430.00 2,750.00 6.34
5/25/2022 9794 30299 20,580.00 2,750.00 7.48
5/25/2022 9795 30365 19,800.00 2,750.00 7.20
5/25/2022 9796 30275 20,390.00 2,750.00 7.41
5/25/2022 9797 30483 13,850.00 2,750.00 5.04
5/25/2022 9798 30122 15,800.00 2,750.00 5.75
5/25/2022 9799 30810 15,430.00 2,750.00 5.61
5/25/2022 9800 30817 13,160.00 2,750.00 4.79
5/25/2022 9801 3096 15,080.00 2,750.00 5.48
5/25/2022 9802 30373 15,710.00 2,750.00 5.71
5/25/2022 9803 30243 21,070.00 2,750.00 7.66
5/25/2022 9804 30438 15,890.00 2,750.00 5.78
5/25/2022 9805 30193 12,790.00 2,750.00 4.65
5/25/2022 9806 30294 16,360.00 2,750.00 5.95
5/25/2022 9807 30113 9,790.00 2,750.00 3.56
5/25/2022 9808 30296 16,610.00 2,750.00 6.04
5/25/2022 9809 30364 15,400.00 2,750.00 5.60
5/25/2022 9810 30125 13,980.00 2,750.00 5.08
5/25/2022 9811 30807 13,760.00 2,750.00 5.00
5/25/2022 9812 30443 15,800.00 2,750.00 5.75
5/25/2022 9813 30153 12,290.00 2,750.00 4.47
5/25/2022 9814 30303 15,870.00 2,750.00 5.77
5/25/2022 9815 30448 16,780.00 2,750.00 6.10
5/25/2022 9816 30358 17,940.00 2,750.00 6.52
5/25/2022 9817 30299 20,410.00 2,750.00 7.42
5/25/2022 9818 30445 15,730.00 2,750.00 5.72
5/25/2022 9819 30360 19,570.00 2,750.00 7.12
5/25/2022 9820 30365 18,360.00 2,750.00 6.68
5/25/2022 9821 30275 17,460.00 2,750.00 6.35
5/25/2022 9822 30483 12,400.00 2,750.00 4.51
5/25/2022 9823 30122 14,720.00 2,750.00 5.35
5/25/2022 9824 30817 12,860.00 2,750.00 4.68
5/25/2022 9825 30438 12,860.00 2,750.00 4.68
5/25/2022 9826 30810 16,160.00 2,750.00 5.88
5/25/2022 9827 3096 13,590.00 2,750.00 4.94
5/25/2022 9828 30294 17,530.00 2,750.00 6.37
5/25/2022 9829 30243 19,750.00 2,750.00 7.18
5/25/2022 9830 30113 9,750.00 2,750.00 3.55
5/25/2022 9831 30807 13,920.00 2,750.00 5.06
5/25/2022 9832 30274 19,500.00 2,750.00 7.09
5/25/2022 9833 30364 17,360.00 2,750.00 6.31
5/25/2022 9834 30448 14,630.00 2,750.00 5.32
5/25/2022 9835 30443 17,100.00 2,750.00 6.22
5/25/2022 9836 30299 16,810.00 2,750.00 6.11
5/25/2022 9837 30125 11,140.00 2,750.00 4.05
5/25/2022 9838 30153 12,820.00 2,750.00 4.66
5/25/2022 9839 30193 11,690.00 2,750.00 4.25
5/25/2022 9840 30303 18,900.00 2,750.00 6.87
5/25/2022 9841 30113 9,790.00 2,750.00 3.56
5/25/2022 9842 30817 13,540.00 2,750.00 4.92
5/25/2022 9843 30448 14,250.00 2,750.00 5.18
5/25/2022 9844 30294 17,360.00 2,750.00 6.31
5/25/2022 9845 30443 14,750.00 2,750.00 5.36
5/25/2022 9846 30299 18,210.00 2,750.00 6.62
5/25/2022 9847 30243 18,540.00 2,750.00 6.74
5/25/2022 9848 30274 17,920.00 2,750.00 6.52
5/25/2022 9849 30445 14,890.00 2,750.00 5.41
5/25/2022 9850 30448 15,690.00 2,750.00 5.71
5/25/2022 9851 30294 14,410.00 2,750.00 5.24
5/25/2022 9852 30360 14,140.00 2,750.00 5.14
5/25/2022 9853 30443 17,520.00 2,750.00 6.37
5/25/2022 9854 30299 18,630.00 2,750.00 6.77
5/25/2022 9855 30275 17,540.00 2,750.00 6.38
5/25/2022 9856 30365 18,060.00 2,750.00 6.57
5/25/2022 9857 30303 17,930.00 2,750.00 6.52
5/25/2022 9858 30448 17,580.00 2,750.00 6.39
5/25/2022 9859 30274 19,300.00 2,750.00 7.02
5/25/2022 9860 30445 14,400.00 2,750.00 5.24
5/25/2022 9861 30243 19,340.00 2,750.00 7.03
5/25/2022 9862 30296 17,710.00 2,750.00 6.44
5/25/2022 9863 30294 18,880.00 2,750.00 6.87
5/25/2022 9864 30360 18,490.00 2,750.00 6.72
5/25/2022 9865 30443 15,780.00 2,750.00 5.74
5/25/2022 9866 30106 16,150.00 2,750.00 5.87
5/25/2022 9867 30364 18,930.00 2,750.00 6.88
5/25/2022 9868 30274 15,010.00 2,750.00 5.46
5/25/2022 9869 30303 19,320.00 2,750.00 7.03
5/25/2022 9870 30299 21,290.00 2,750.00 7.74
5/25/2022 9871 30275 19,120.00 2,750.00 6.95
5/25/2022 9872 30296 15,050.00 2,750.00 5.47
5/25/2022 9873 30448 17,580.00 2,750.00 6.39
5/25/2022 9874 30300 22,720.00 2,750.00 8.26
5/25/2022 9875 30445 17,870.00 2,750.00 6.50
5/25/2022 9876 30373 16,730.00 2,750.00 6.08
5/25/2022 9877 30243 15,360.00 2,750.00 5.59
5/25/2022 9878 30125 17,680.00 2,750.00 6.43
TOTALES 1,494,950.00 250,250.00 543.62
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
91.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
5/26/2022 9879 30448 13,410.00 2,750.00 4.88
5/26/2022 9880 30358 29,090.00 2,750.00 10.58
5/26/2022 9881 30448 14,920.00 2,750.00 5.43
5/26/2022 9882 30122 13,330.00 2,750.00 4.85
5/26/2022 9883 30113 10,050.00 2,750.00 3.65
5/26/2022 9884 30364 19,290.00 2,750.00 7.01
5/26/2022 9885 30294 16,940.00 2,750.00 6.16
5/26/2022 9886 2,750.00 0.00
5/26/2022 9887 30483 10,530.00 2,750.00 3.83
5/26/2022 9888 30125 12,980.00 2,750.00 4.72
5/26/2022 9889 30106 10,740.00 2,750.00 3.91
5/26/2022 9890 3096 15,180.00 2,750.00 5.52
5/26/2022 9891 30193 12,460.00 2,750.00 4.53
5/26/2022 9892 30243 16,050.00 2,750.00 5.84
5/26/2022 9893 30296 18,160.00 2,750.00 6.60
5/26/2022 9894 30445 13,140.00 2,750.00 4.78
5/26/2022 9895 30303 20,700.00 2,750.00 7.53
5/26/2022 9896 30373 19,250.00 2,750.00 7.00
5/26/2022 9897 30275 19,430.00 2,750.00 7.07
5/26/2022 9898 30810 14,840.00 2,750.00 5.40
5/26/2022 9899 30483 13,800.00 2,750.00 5.02
5/26/2022 9900 30122 12,610.00 2,750.00 4.59
5/26/2022 9901 30294 16,080.00 2,750.00 5.85
5/26/2022 9902 30299 19,880.00 2,750.00 7.23
5/26/2022 9903 30364 19,280.00 2,750.00 7.01
5/26/2022 9904 30243 16,620.00 2,750.00 6.04
5/26/2022 9905 30125 12,800.00 2,750.00 4.65
5/26/2022 9906 30193 12,060.00 2,750.00 4.39
5/26/2022 9907 30106 12,120.00 2,750.00 4.41
5/26/2022 9908 30296 16,660.00 2,750.00 6.06
5/26/2022 9909 30358 18,440.00 2,750.00 6.71
5/26/2022 9910 30360 18,040.00 2,750.00 6.56
5/26/2022 9911 30113 11,190.00 2,750.00 4.07
5/26/2022 9912 30144 16,440.00 2,750.00 5.98
5/26/2022 9913 30274 18,720.00 2,750.00 6.81
5/26/2022 9914 30373 12,120.00 2,750.00 4.41
5/26/2022 9915 30303 17,250.00 2,750.00 6.27
5/26/2022 9916 30448 15,490.00 2,750.00 5.63
5/26/2022 9917 30483 13,650.00 2,750.00 4.96
5/26/2022 9918 30365 15,310.00 2,750.00 5.57
5/26/2022 9919 30443 17,720.00 2,750.00 6.44
5/26/2022 9920 30294 16,200.00 2,750.00 5.89
5/26/2022 9921 30153 20,330.00 2,750.00 7.39
5/26/2022 9922 30810 13,400.00 2,750.00 4.87
5/26/2022 9923 30807 14,540.00 2,750.00 5.29
5/26/2022 9924 30299 20,630.00 2,750.00 7.50
5/26/2022 9925 30113 9,500.00 2,750.00 3.45
5/26/2022 9926 30358 21,170.00 2,750.00 7.70
5/26/2022 9927 30373 16,690.00 2,750.00 6.07
5/26/2022 9928 30296 14,820.00 2,750.00 5.39
5/26/2022 9929 30445 16,310.00 2,750.00 5.93
5/26/2022 9930 30360 16,790.00 2,750.00 6.11
5/26/2022 9931 30365 14,140.00 2,750.00 5.14
5/26/2022 9932 30303 15,450.00 2,750.00 5.62
5/26/2022 9933 30125 14,110.00 2,750.00 5.13
5/26/2022 9934 30275 14,840.00 2,750.00 5.40
5/26/2022 9935 30106 11,580.00 2,750.00 4.21
5/26/2022 9936 30153 16,440.00 2,750.00 5.98
5/26/2022 9937 30807 16,040.00 2,750.00 5.83
5/26/2022 9938 30243 17,860.00 2,750.00 6.49
5/26/2022 9939 30193 15,970.00 2,750.00 5.81
5/26/2022 9940 30448 15,360.00 2,750.00 5.59
5/26/2022 9941 30113 11,610.00 2,750.00 4.22
5/26/2022 9942 30294 17,610.00 2,750.00 6.40
5/26/2022 9943 30365 17,040.00 2,750.00 6.20
5/26/2022 9944 30443 15,570.00 2,750.00 5.66
5/26/2022 9945 30358 17,020.00 2,750.00 6.19
5/26/2022 9946 30299 17,060.00 2,750.00 6.20
5/26/2022 9947 30303 14,520.00 2,750.00 5.28
5/26/2022 9948 30300 18,610.00 2,750.00 6.77
5/26/2022 9949 30360 15,150.00 2,750.00 5.51
5/26/2022 9950 30445 26,040.00 2,750.00 9.47
5/26/2022 9951 30364 19,510.00 2,750.00 7.09
5/26/2022 9952 30296 14,120.00 2,750.00 5.13
5/26/2022 9953 30275 17,080.00 2,750.00 6.21
5/26/2022 9954 30153 15,030.00 2,750.00 5.47
5/26/2022 9955 30448 13,990.00 2,750.00 5.09
5/26/2022 9956 30113 11,270.00 2,750.00 4.10
5/26/2022 9957 30243 15,390.00 2,750.00 5.60
5/26/2022 9958 30106 11,230.00 2,750.00 4.08
5/26/2022 9959 30365 18,150.00 2,750.00 6.60
5/26/2022 9960 30294 15,010.00 2,750.00 5.46
5/26/2022 9961 30443 15,980.00 2,750.00 5.81
5/26/2022 9962 30358 18,050.00 2,750.00 6.56
5/26/2022 9963 30299 19,940.00 2,750.00 7.25
5/26/2022 9964 30483 12,580.00 2,750.00 4.57
5/26/2022 9965 30113 11,790.00 2,750.00 4.29
5/26/2022 9966 30303 18,000.00 2,750.00 6.55
5/26/2022 9967 30300 19,830.00 2,750.00 7.21
5/26/2022 9968 30296 17,380.00 2,750.00 6.32
5/26/2022 9969 30364 21,280.00 2,750.00 7.74
5/26/2022 9970 30275 17,480.00 2,750.00 6.36
5/26/2022 9971 30448 15,920.00 2,750.00 5.79
5/26/2022 9972 30243 16,610.00 2,750.00 6.04
5/26/2022 9973 30360 21,850.00 2,750.00 7.95
5/26/2022 9974 30365 17,600.00 2,750.00 6.40
5/26/2022 9975 30153 17,000.00 2,750.00 6.18
5/26/2022 9976 30438 14,340.00 2,750.00 5.21
5/26/2022 9977 30294 18,030.00 2,750.00 6.56
5/26/2022 9978 30445 18,840.00 2,750.00 6.85
5/26/2022 9979 30299 18,510.00 2,750.00 6.73
5/26/2022 9980 30358 17,030.00 2,750.00 6.19
5/26/2022 9981 30443 14,690.00 2,750.00 5.34
TOTALES 1,642,680.00 283,250.00 597.34
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+101
1.00 Bolon 54+102
1.00 Bolon 54+103
1.00 Bolon 54+104
103.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
6/1/2022 9982 30300 15,560.00 2,750.00 5.66
6/1/2022 9983 30303 16,450.00 2,750.00 5.98
6/1/2022 9984 30296 19,030.00 2,750.00 6.92
6/1/2022 9985 30364 18,780.00 2,750.00 6.83
6/1/2022 9986 30300 23,600.00 2,750.00 8.58
6/1/2022 9987 30483 17,110.00 2,750.00 6.22
6/1/2022 9988 30358 21,620.00 2,750.00 7.86
6/1/2022 9989 30296 19,640.00 2,750.00 7.14
6/1/2022 9990 30817 14,930.00 2,750.00 5.43
6/1/2022 9991 30807 18,700.00 2,750.00 6.80
6/1/2022 9992 30303 18,470.00 2,750.00 6.72
6/1/2022 9993 30294 19,910.00 2,750.00 7.24
6/1/2022 9994 30144 14,590.00 2,750.00 5.31
6/1/2022 9995 30493 18,760.00 2,750.00 6.82
6/1/2022 9996 30122 12,480.00 2,750.00 4.54
6/1/2022 9997 30106 16,390.00 2,750.00 5.96
6/1/2022 9998 30443 19,520.00 2,750.00 7.10
6/1/2022 9999 30299 19,370.00 2,750.00 7.04
6/1/2022 10000 30294 19,620.00 2,750.00 7.13
6/1/2022 10001 30296 18,890.00 2,750.00 6.87
6/1/2022 10002 30243 21,180.00 2,750.00 7.70
6/1/2022 10003 30303 18,280.00 2,750.00 6.65
6/1/2022 10004 30106 15,680.00 2,750.00 5.70
6/1/2022 10005 30365 18,320.00 2,750.00 6.66
6/1/2022 10006 30300 21,830.00 2,750.00 7.94
6/1/2022 10007 30296 19,280.00 2,750.00 7.01
6/1/2022 10008 30299 19,090.00 2,750.00 6.94
6/1/2022 10009 30303 18,680.00 2,750.00 6.79
6/1/2022 10010 30294 20,640.00 2,750.00 7.51
6/1/2022 10011 30243 20,530.00 2,750.00 7.47
6/1/2022 10012 30300 17,040.00 2,750.00 6.20
6/1/2022 10013 30106 12,960.00 2,750.00 4.71
6/1/2022 10014 30296 17,800.00 2,750.00 6.47
6/1/2022 10015 30303 18,790.00 2,750.00 6.83
6/1/2022 10016 30243 16,860.00 2,750.00 6.13
6/1/2022 10017 30300 20,860.00 2,750.00 7.59
6/1/2022 10018 30303 17,560.00 2,750.00 6.39
6/1/2022 10019 30296 17,190.00 2,750.00 6.25
6/1/2022 10020 30300 20,040.00 2,750.00 7.29
6/1/2022 10021 30243 19,900.00 2,750.00 7.24
TOTALES 735,930.00 110,000.00 267.61
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
40.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
6/2/2022 10022 30303 17,610.00 2,750.00 6.40
6/2/2022 10023 30364 15,050.00 2,750.00 5.47
6/2/2022 10024 30817 15,250.00 2,750.00 5.55
6/2/2022 10025 30300 21,170.00 2,750.00 7.70
6/2/2022 10026 30358 23,280.00 2,750.00 8.47
6/2/2022 10027 30438 14,250.00 2,750.00 5.18
6/2/2022 10028 30445 19,080.00 2,750.00 6.94
6/2/2022 10029 30360 19,680.00 2,750.00 7.16
6/2/2022 10030 30106 15,570.00 2,750.00 5.66
6/2/2022 10031 30443 17,510.00 2,750.00 6.37
6/2/2022 10032 30294 19,000.00 2,750.00 6.91
6/2/2022 10033 2,750.00 0.00
6/2/2022 10034 30365 12,970.00 2,750.00 4.72
6/2/2022 10035 30125 16,250.00 2,750.00 5.91
6/2/2022 10036 30345 14,260.00 2,750.00 5.19
6/2/2022 10037 30386 11,600.00 2,750.00 4.22
6/2/2022 10038 30300 27,660.00 2,750.00 10.06
6/2/2022 10039 30243 18,260.00 2,750.00 6.64
6/2/2022 10040 30365 15,990.00 2,750.00 5.81
6/2/2022 10041 30294 16,180.00 2,750.00 5.88
6/2/2022 10042 30300 20,460.00 2,750.00 7.44
6/2/2022 10043 30125 15,140.00 2,750.00 5.51
6/2/2022 10044 30386 11,240.00 2,750.00 4.09
6/2/2022 10045 30364 17,430.00 2,750.00 6.34
6/2/2022 10046 30358 21,160.00 2,750.00 7.69
6/2/2022 10047 30296 18,090.00 2,750.00 6.58
6/2/2022 10048 30243 16,950.00 2,750.00 6.16
6/2/2022 10049 30360 15,820.00 2,750.00 5.75
6/2/2022 10050 30438 13,730.00 2,750.00 4.99
6/2/2022 10051 30345 20,340.00 2,750.00 7.40
6/2/2022 10052 30294 19,630.00 2,750.00 7.14
6/2/2022 10053 30106 15,100.00 2,750.00 5.49
6/2/2022 10054 30807 16,490.00 2,750.00 6.00
6/2/2022 10055 30300 20,050.00 2,750.00 7.29
6/2/2022 10056 30303 17,590.00 2,750.00 6.40
6/2/2022 10057 30817 11,260.00 2,750.00 4.09
6/2/2022 10058 30443 16,370.00 2,750.00 5.95
6/2/2022 10059 30386 18,120.00 2,750.00 6.59
6/2/2022 10060 30125 16,190.00 2,750.00 5.89
6/2/2022 10061 30364 17,980.00 2,750.00 6.54
6/2/2022 10062 30296 17,570.00 2,750.00 6.39
6/2/2022 10063 30294 18,400.00 2,750.00 6.69
6/2/2022 10064 30303 19,120.00 2,750.00 6.95
6/2/2022 10065 30300 18,540.00 2,750.00 6.74
TOTALES 743,390.00 121,000.00 270.32
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+101
1.00 Bolon 54+102
1.00 Bolon 54+103
1.00 Bolon 54+104
1.00 Bolon 54+105
1.00 Bolon 54+106
1.00 Bolon 54+107
1.00 Bolon 54+108
1.00 Bolon 54+109
1.00 Bolon 54+110
1.00 Bolon 54+111
1.00 Bolon 54+112
1.00 Bolon 54+113
1.00 Bolon 54+114
1.00 Bolon 54+115
1.00 Bolon 54+116
1.00 Bolon 54+117
1.00 Bolon 54+118
44.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
6/3/2022 10066 30300 20,030.00 2,750.00 7.28
6/3/2022 10067 30294 17,690.00 2,750.00 6.43
6/3/2022 10068 30303 16,740.00 2,750.00 6.09
6/3/2022 10069 30364 15,510.00 2,750.00 5.64
6/3/2022 10070 30365 18,840.00 2,750.00 6.85
6/3/2022 10071 30493 14,970.00 2,750.00 5.44
6/3/2022 10072 30106 14,710.00 2,750.00 5.35
6/3/2022 10073 30386 17,170.00 2,750.00 6.24
6/3/2022 10074 30296 22,010.00 2,750.00 8.00
6/3/2022 10075 30438 11,020.00 2,750.00 4.01
6/3/2022 10076 30445 15,760.00 2,750.00 5.73
6/3/2022 10077 30358 18,260.00 2,750.00 6.64
6/3/2022 10078 30807 11,220.00 2,750.00 4.08
6/3/2022 10079 30360 17,720.00 2,750.00 6.44
6/3/2022 10080 30817 13,430.00 2,750.00 4.88
6/3/2022 10081 30294 14,490.00 2,750.00 5.27
6/3/2022 10082 30303 14,880.00 2,750.00 5.41
6/3/2022 10083 30300 18,690.00 2,750.00 6.80
6/3/2022 10084 30364 16,310.00 2,750.00 5.93
6/3/2022 10085 30493 14,210.00 2,750.00 5.17
6/3/2022 10086 30296 20,720.00 2,750.00 7.53
6/3/2022 10087 30386 12,980.00 2,750.00 4.72
6/3/2022 10088 30365 14,020.00 2,750.00 5.10
6/3/2022 10089 30445 19,180.00 2,750.00 6.97
6/3/2022 10090 30358 16,400.00 2,750.00 5.96
6/3/2022 10091 30360 16,120.00 2,750.00 5.86
6/3/2022 10092 30106 16,860.00 2,750.00 6.13
6/3/2022 10093 30300 17,410.00 2,750.00 6.33
6/3/2022 10094 30303 16,330.00 2,750.00 5.94
6/3/2022 10095 30807 14,860.00 2,750.00 5.40
6/3/2022 10096 30817 14,430.00 2,750.00 5.25
6/3/2022 10097 30294 17,910.00 2,750.00 6.51
6/3/2022 10098 30364 19,930.00 2,750.00 7.25
6/3/2022 10099 30493 16,130.00 2,750.00 5.87
6/3/2022 10100 30365 15,730.00 2,750.00 5.72
6/3/2022 10101 30296 17,200.00 2,750.00 6.25
6/3/2022 10102 30443 16,660.00 2,750.00 6.06
TOTALES 606,530.00 101,750.00 220.56
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+901
1.00 Bolon 53+901
1.00 Bolon 53+902
1.00 Bolon 53+902
1.00 Bolon 53+903
1.00 Bolon 53+903
1.00 Bolon 53+904
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 53+900
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+100
1.00 Bolon 54+101
1.00 Bolon 54+102
1.00 Bolon 54+103
1.00 Bolon 54+104
1.00 Bolon 54+105
1.00 Bolon 54+106
1.00 Bolon 54+107
1.00 Bolon 54+108
1.00 Bolon 54+109
1.00 Bolon 54+110
1.00 Bolon 54+111
37.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Fecha Boleta Código/Placa Peso Neto (kg) Peso Roca (kg/m3) Volumen (m3)
6/4/2022 10103 30-817 13,310.00 2,750.00 4.84
6/4/2022 10104 30-294 19,670.00 2,750.00 7.15
6/4/2022 10105 30-364 17,080.00 2,750.00 6.21
6/4/2022 10106 30-493 15,240.00 2,750.00 5.54
6/4/2022 10107 30-303 17,230.00 2,750.00 6.27
6/4/2022 10108 30-358 18,070.00 2,750.00 6.57
6/4/2022 10109 30-296 16,950.00 2,750.00 6.16
6/4/2022 10110 30-386 18,660.00 2,750.00 6.79
6/4/2022 10111 30-445 17,390.00 2,750.00 6.32
6/4/2022 10112 30-106 14,790.00 2,750.00 5.38
6/4/2022 10113 30-365 17,790.00 2,750.00 6.47
6/4/2022 10114 30-364 19,800.00 2,750.00 7.20
6/4/2022 10115 30-438 15,410.00 2,750.00 5.60
6/4/2022 10116 30-294 13,430.00 2,750.00 4.88
6/4/2022 10117 30-303 15,860.00 2,750.00 5.77
6/4/2022 10118 30-817 14,200.00 2,750.00 5.16
6/4/2022 10119 30-493 14,400.00 2,750.00 5.24
6/4/2022 10120 30-443 16,030.00 2,750.00 5.83
6/4/2022 10121 32-000 18,570.00 2,750.00 6.75
6/4/2022 10122 30-358 19,610.00 2,750.00 7.13
6/4/2022 10123 30-296 16,180.00 2,750.00 5.88
6/4/2022 10124 30-386 14,430.00 2,750.00 5.25
6/4/2022 10125 30-365 15,840.00 2,750.00 5.76
6/4/2022 10126 30-106 15,360.00 2,750.00 5.59
6/4/2022 10127 30-294 17,770.00 2,750.00 6.46
6/4/2022 10128 30-438 14,920.00 2,750.00 5.43
6/4/2022 10129 30-364 20,370.00 2,750.00 7.41
6/4/2022 10130 30-303 18,790.00 2,750.00 6.83
6/4/2022 10131 30-493 16,110.00 2,750.00 5.86
6/4/2022 10132 30-817 15,950.00 2,750.00 5.80
6/4/2022 10133 30-443 14,860.00 2,750.00 5.40
6/4/2022 10134 30-335 13,190.00 2,750.00 4.80
6/4/2022 10135 30-296 19,090.00 2,750.00 6.94
6/4/2022 10136 30-386 14,970.00 2,750.00 5.44
6/4/2022 10137 30-358 21,110.00 2,750.00 7.68
6/4/2022 10138 30-365 14,920.00 2,750.00 5.43
6/4/2022 10139 30-438 13,270.00 2,750.00 4.83
6/4/2022 10140 30-364 19,400.00 2,750.00 7.05
6/4/2022 10141 30-493 17,140.00 2,750.00 6.23
6/4/2022 10142 30-294 16,720.00 2,750.00 6.08
6/4/2022 10143 30-360 20,120.00 2,750.00 7.32
6/4/2022 10144 30-443 15,710.00 2,750.00 5.71
6/4/2022 10145 30-807 17,180.00 2,750.00 6.25
6/4/2022 10146 30-303 17,890.00 2,750.00 6.51
6/4/2022 10147 30-386 13,160.00 2,750.00 4.79
6/4/2022 10148 30-296 17,650.00 2,750.00 6.42
6/4/2022 10149 30-106 14,510.00 2,750.00 5.28
6/4/2022 10150 30-358 21,320.00 2,750.00 7.75
6/4/2022 10151 30-817 13,320.00 2,750.00 4.84
6/4/2022 10152 30-365 15,890.00 2,750.00 5.78
6/4/2022 10153 30-438 11,040.00 2,750.00 4.01
6/4/2022 10154 30-493 18,360.00 2,750.00 6.68
6/4/2022 10155 30-303 17,730.00 2,750.00 6.45
6/4/2022 10156 30-807 16,550.00 2,750.00 6.02
6/4/2022 10157 30-360 19,790.00 2,750.00 7.20
6/4/2022 10158 30-386 10,540.00 2,750.00 3.83
6/4/2022 10159 30-106 10,500.00 2,750.00 3.82
6/4/2022 10160 30-294 17,320.00 2,750.00 6.30
6/4/2022 10161 30-296 16,000.00 2,750.00 5.82
6/4/2022 10162 30-358 18,120.00 2,750.00 6.59
6/4/2022 10163 30-443 17,490.00 2,750.00 6.36
6/4/2022 10164 30-807 14,580.00 2,750.00 5.30
6/4/2022 10165 30-493 19,460.00 2,750.00 7.08
6/4/2022 10166 30-294 14,840.00 2,750.00 5.40
6/4/2022 10167 30-386 15,370.00 2,750.00 5.59
6/4/2022 10168 30-303 16,930.00 2,750.00 6.16
6/4/2022 10169 30-360 22,490.00 2,750.00 8.18
6/4/2022 10170 30-817 16,310.00 2,750.00 5.93
6/4/2022 10171 30-365 17,230.00 2,750.00 6.27
6/4/2022 10172 30-438 17,340.00 2,750.00 6.31
6/4/2022 10173 30-386 27,010.00 2,750.00 9.82
6/4/2022 10174 30-296 12,290.00 2,750.00 4.47
6/4/2022 10175 30-817 12,820.00 2,750.00 4.66
6/4/2022 10176 30-445 15,790.00 2,750.00 5.74
6/4/2022 10177 30-365 25,610.00 2,750.00 9.31
6/4/2022 10178 30-106 11,660.00 2,750.00 4.24
6/4/2022 10179 30-358 18,380.00 2,750.00 6.68
6/4/2022 10180 30-493 18,810.00 2,750.00 6.84
6/4/2022 10181 30-443 15,000.00 2,750.00 5.45
6/4/2022 10182 30-294 14610 2,750.00
TOTALES 1,330,600.00 220,000.00 478.54
a – Puerto Cabezas (85.65km)”

lén t=0.90

Viajes Material Estac. Destino


1.00 Bolon 53+900 30 - -81 30--81
1.00 Bolon 53+900 30 - -29 30--29
1.00 Bolon 53+901 30 - -36 30--36
1.00 Bolon 53+901 30 - -49 30--49
1.00 Bolon 53+902 30 - -30 30--30
1.00 Bolon 53+902 30 - -35 30--35
1.00 Bolon 53+903 30 - -29 30--29
1.00 Bolon 53+903 30 - -38 30--38
1.00 Bolon 53+904 30 - -44 30--44
1.00 Bolon 53+900 30 - -10 30--10
1.00 Bolon 53+900 30 - -36 30--36
1.00 Bolon 53+900 30 - -36 30--36
1.00 Bolon 53+900 30 - -43 30--43
1.00 Bolon 53+900 30 - -29 30--29
1.00 Bolon 53+900 30 - -30 30--30
1.00 Bolon 53+900 30 - -81 30--81
1.00 Bolon 54+100 30 - -49 30--49
1.00 Bolon 54+100 30 - -44 30--44
1.00 Bolon 54+100 32 - -00 32--00
1.00 Bolon 54+100 30 - -35 30--35
1.00 Bolon 54+100 30 - -29 30--29
1.00 Bolon 54+100 30 - -38 30--38
1.00 Bolon 54+100 30 - -36 30--36
1.00 Bolon 54+100 30 - -10 30--10
1.00 Bolon 54+100 30 - -29 30--29
1.00 Bolon 54+100 30 - -43 30--43
1.00 Bolon 54+101 30 - -36 30--36
1.00 Bolon 54+102 30 - -30 30--30
1.00 Bolon 54+103 30 - -49 30--49
1.00 Bolon 54+104 30 - -81 30--81
1.00 Bolon 54+105 30 - -44 30--44
1.00 Bolon 54+106 30 - -33 30--33
1.00 Bolon 54+107 30 - -29 30--29
1.00 Bolon 54+108 30 - -38 30--38
1.00 Bolon 54+109 30 - -35 30--35
1.00 Bolon 54+110 30 - -36 30--36
1.00 Bolon 54+111 30 - -43 30--43
1.00 Bolon 54+112 30 - -36 30--36
1.00 Bolon 54+113 30 - -49 30--49
1.00 Bolon 54+114 30 - -29 30--29
1.00 Bolon 54+115 30 - -36 30--36
1.00 Bolon 54+116 30 - -44 30--44
1.00 Bolon 54+117 30 - -80 30--80
1.00 Bolon 54+118 30 - -30 30--30
1.00 Bolon 54+119 30 - -38 30--38
1.00 Bolon 54+120 30 - -29 30--29
1.00 Bolon 54+121 30 - -10 30--10
1.00 Bolon 54+122 30 - -35 30--35
1.00 Bolon 54+123 30 - -81 30--81
1.00 Bolon 54+124 30 - -36 30--36
1.00 Bolon 54+125 30 - -43 30--43
1.00 Bolon 54+126 30 - -49 30--49
1.00 Bolon 54+127 30 - -30 30--30
1.00 Bolon 54+128 30 - -80 30--80
1.00 Bolon 54+129 30 - -36 30--36
1.00 Bolon 54+130 30 - -38 30--38
1.00 Bolon 54+131 30 - -10 30--10
1.00 Bolon 54+132 30 - -29 30--29
1.00 Bolon 54+133 30 - -29 30--29
1.00 Bolon 54+134 30 - -35 30--35
1.00 Bolon 54+135 30 - -44 30--44
1.00 Bolon 54+136 30 - -80 30--80
1.00 Bolon 54+137 30 - -49 30--49
1.00 Bolon 54+138 30 - -29 30--29
1.00 Bolon 54+139 30 - -38 30--38
1.00 Bolon 54+140 30 - -30 30--30
1.00 Bolon 54+141 30 - -36 30--36
1.00 Bolon 54+142 30 - -81 30--81
1.00 Bolon 54+143 30 - -36 30--36
1.00 Bolon 54+144 30 - -43 30--43
1.00 Bolon 54+145 30 - -38 30--38
1.00 Bolon 54+146 30 - -29 30--29
1.00 Bolon 54+147 30 - -81 30--81
1.00 Bolon 54+148 30 - -44 30--44
1.00 Bolon 54+149 30 - -36 30--36
1.00 Bolon 54+150 30 - -10 30--10
1.00 Bolon 54+151 30 - -35 30--35
1.00 Bolon 54+152 30 - -49 30--49
1.00 Bolon 54+153 30 - -44 30--44
1.00 Bolon 54+154 30 - -29 30--29
80.00
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/5/2022 10184 30-300 17,760.00 2,750.00 6.46 1.00
6/5/2022 10185 30-483 16,340.00 2,750.00 5.94 1.00
6/5/2022 10186 30-364 18,420.00 2,750.00 6.70 1.00
6/5/2022 10187 30-294 18,460.00 2,750.00 6.71 1.00
6/5/2022 10188 30-303 18,470.00 2,750.00 6.72 1.00
6/5/2022 10189 30-275 19,230.00 2,750.00 6.99 1.00
6/5/2022 10190 30-807 15,000.00 2,750.00 5.45 1.00
6/5/2022 10191 30-386 10,780.00 2,750.00 3.92 1.00
6/5/2022 10192 30-365 24,010.00 2,750.00 8.73 1.00
6/5/2022 10193 30-493 16,710.00 2,750.00 6.08 1.00
6/5/2022 10194 30-335 10,390.00 2,750.00 3.78 1.00
6/5/2022 10195 30-373 17,720.00 2,750.00 6.44 1.00
6/5/2022 10196 30-817 13,610.00 2,750.00 4.95 1.00
6/5/2022 10197 30-360 24,200.00 2,750.00 8.80 1.00
6/5/2022 10198 30-438 14,250.00 2,750.00 5.18 1.00
6/5/2022 10199 30-445 17,070.00 2,750.00 6.21 1.00
6/5/2022 10200 30-296 15,480.00 2,750.00 5.63 1.00
6/5/2022 10201 30-299 20,630.00 2,750.00 7.50 1.00
6/5/2022 10202 30-122 14,870.00 2,750.00 5.41 1.00
6/5/2022 10203 30-153 19,180.00 2,750.00 6.97 1.00
6/5/2022 10204 30-193 13,680.00 2,750.00 4.97 1.00
6/5/2022 10205 30-810 17,990.00 2,750.00 6.54 1.00
6/5/2022 10206 30-96 14,190.00 2,750.00 5.16 1.00
6/5/2022 10207 30-125 18,220.00 2,750.00 6.63 1.00
6/5/2022 10208 30-106 13,400.00 2,750.00 4.87 1.00
6/5/2022 10209 30-443 19,610.00 2,750.00 7.13 1.00
6/5/2022 10210 30-300 20,720.00 2,750.00 7.53 1.00
6/5/2022 10211 30-300 20,720.00 2,750.00 7.53 1.00
6/5/2022 10212 30-294 17,680.00 2,750.00 6.43 1.00
6/5/2022 10213 30-275 20,650.00 2,750.00 7.51 1.00
6/5/2022 10214 30-273 19,980.00 2,750.00 7.27 1.00
6/5/2022 10215 30-385 27,920.00 2,750.00 10.15 1.00
6/5/2022 10216 30-303 16,810.00 2,750.00 6.11 1.00
6/5/2022 10217 30-296 18,580.00 2,750.00 6.76 1.00
6/5/2022 10218 30-365 19,200.00 2,750.00 6.98 1.00
6/5/2022 10219 30-438 14,560.00 2,750.00 5.29 1.00
6/5/2022 10220 30-364 19,800.00 2,750.00 7.20 1.00
6/5/2022 10221 30-493 14,890.00 2,750.00 5.41 1.00
6/5/2022 10222 30-445 13,330.00 2,750.00 4.85 1.00
6/5/2022 10223 30-360 18,860.00 2,750.00 6.86 1.00
6/5/2022 10224 30-299 17,440.00 2,750.00 6.34 1.00
6/5/2022 10225 30-153 13,040.00 2,750.00 4.74 1.00
6/5/2022 10226 30-810 18,610.00 2,750.00 6.77 1.00
6/5/2022 10227 30-386 16,240.00 2,750.00 5.91 1.00
6/5/2022 10228 30-113 11,290.00 2,750.00 4.11 1.00
6/5/2022 10229 30-300 18,960.00 2,750.00 6.89 1.00
6/5/2022 10230 30-125 12,350.00 2,750.00 4.49 1.00
6/5/2022 10231 30-358 33,820.00 2,750.00 12.30 1.00
6/5/2022 10232 30-443 17,900.00 2,750.00 6.51 1.00
6/5/2022 10233 30-303 18,330.00 2,750.00 6.67 1.00
6/5/2022 10234 30-296 17,230.00 2,750.00 6.27 1.00
6/5/2022 10235 30-364 16,560.00 2,750.00 6.02 1.00
6/5/2022 10236 30-365 18,310.00 2,750.00 6.66 1.00
6/5/2022 10237 30-273 18,790.00 2,750.00 6.83 1.00
6/5/2022 10238 30-275 18,540.00 2,750.00 6.74 1.00
6/5/2022 10239 30-807 16,280.00 2,750.00 5.92 1.00
6/5/2022 10240 30-445 15,380.00 2,750.00 5.59 1.00
6/5/2022 10241 30-493 12,530.00 2,750.00 4.56 1.00
6/5/2022 10242 30-299 18,750.00 2,750.00 6.82 1.00
6/5/2022 10243 30-294 15,320.00 2,750.00 5.57 1.00
6/5/2022 10244 30-106 14,130.00 2,750.00 5.14 1.00
6/5/2022 10245 30-153 18,640.00 2,750.00 6.78 1.00
6/5/2022 10246 30-122 11,280.00 2,750.00 4.10 1.00
6/5/2022 10247 30-365 15,930.00 2,750.00 5.79 1.00
6/5/2022 10248 30-300 20,470.00 2,750.00 7.44 1.00
6/5/2022 10249 30-386 13,170.00 2,750.00 4.79 1.00
6/5/2022 10250 30-113 11,010.00 2,750.00 4.00 1.00
6/5/2022 10251 30-358 15,470.00 2,750.00 5.63 1.00
6/5/2022 10252 30-810 15,460.00 2,750.00 5.62 1.00
6/5/2022 10253 30-296 18,180.00 2,750.00 6.61 1.00
6/5/2022 10254 30-303 17,260.00 2,750.00 6.28 1.00
6/5/2022 10255 30-364 19,770.00 2,750.00 7.19 1.00
6/5/2022 10256 30-275 15,180.00 2,750.00 5.52 1.00
6/5/2022 10257 30-817 8,820.00 2,750.00 3.21 1.00
TOTALES 1,263,810.00 203,500.00 459.57 74.00
o Cabezas (85.65km)”

Estac.
Material
Destino
Bolon 30 - -30 30--30
Bolon 30 - -48 30--48
Bolon 30 - -36 30--36
Bolon 30 - -29 30--29
Bolon 30 - -30 30--30
Bolon 30 - -27 30--27
Bolon 30 - -80 30--80
Bolon 30 - -38 30--38
Bolon 30 - -36 30--36
Bolon 30 - -49 30--49
Bolon 30 - -33 30--33
Bolon 30 - -37 30--37
Bolon 30 - -81 30--81
Bolon 30 - -36 30--36
Bolon 30 - -43 30--43
Bolon 30 - -44 30--44
Bolon 30 - -29 30--29
Bolon 30 - -29 30--29
Bolon 30 - -12 30--12
Bolon 30 - -15 30--15
Bolon 30 - -19 30--19
Bolon 30 - -81 30--81
Bolon 30 - -96 30--96
Bolon 30 - -12 30--12
Bolon 30 - -10 30--10
Bolon 30 - -44 30--44
Bolon 30 - -30 30--30
Bolon 30 - -30 30--30
Bolon 30 - -29 30--29
Bolon 30 - -27 30--27
Bolon 30 - -27 30--27
Bolon 30 - -38 30--38
Bolon 30 - -30 30--30
Bolon 30 - -29 30--29
Bolon 30 - -36 30--36
Bolon 30 - -43 30--43
Bolon 30 - -36 30--36
Bolon 30 - -49 30--49
Bolon 30 - -44 30--44
Bolon 30 - -36 30--36
Bolon 30 - -29 30--29
Bolon 30 - -15 30--15
Bolon 30 - -81 30--81
Bolon 30 - -38 30--38
Bolon 30 - -11 30--11
Bolon 30 - -30 30--30
Bolon 30 - -12 30--12
Bolon 30 - -35 30--35
Bolon 30 - -44 30--44
Bolon 30 - -30 30--30
Bolon 30 - -29 30--29
Bolon 30 - -36 30--36
Bolon 30 - -36 30--36
Bolon 30 - -27 30--27
Bolon 30 - -27 30--27
Bolon 30 - -80 30--80
Bolon 30 - -44 30--44
Bolon 30 - -49 30--49
Bolon 30 - -29 30--29
Bolon 30 - -29 30--29
Bolon 30 - -10 30--10
Bolon 30 - -15 30--15
Bolon 30 - -12 30--12
Bolon 30 - -36 30--36
Bolon 30 - -30 30--30
Bolon 30 - -38 30--38
Bolon 30 - -11 30--11
Bolon 30 - -35 30--35
Bolon 30 - -81 30--81
Bolon 30 - -29 30--29
Bolon 30 - -30 30--30
Bolon 30 - -36 30--36
Bolon 30 - -27 30--27
Bolon 30 - -81 30--81
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/6/2022 10259 30-364 18,440.00 2,750.00 6.71 1.00
6/6/2022 10260 30-807 12,860.00 2,750.00 4.68 1.00
6/6/2022 10261 30-493 18,480.00 2,750.00 6.72 1.00
6/6/2022 10262 30-438 14,710.00 2,750.00 5.35 1.00
6/6/2022 10263 30-360 19,720.00 2,750.00 7.17 1.00
6/6/2022 10264 30-445 14,420.00 2,750.00 5.24 1.00
6/6/2022 10265 30-303 15,920.00 2,750.00 5.79 1.00
6/6/2022 10266 30-273 17,240.00 2,750.00 6.27 1.00
6/6/2022 10267 30-296 18,220.00 2,750.00 6.63 1.00
6/6/2022 10268 30-443 16,130.00 2,750.00 5.87 1.00
6/6/2022 10269 30-364 16,070.00 2,750.00 5.84 1.00
6/6/2022 10270 30-386 14,690.00 2,750.00 5.34 1.00
6/6/2022 10271 30-807 12,630.00 2,750.00 4.59 1.00
6/6/2022 10272 30-817 13,620.00 2,750.00 4.95 1.00
6/6/2022 10273 30-294 18,220.00 2,750.00 6.63 1.00
6/6/2022 10274 30-493 30,850.00 2,750.00 11.22 1.00
6/6/2022 10275 30-303 16,460.00 2,750.00 5.99 1.00
6/6/2022 10276 30-445 17,540.00 2,750.00 6.38 1.00
6/6/2022 10277 30-438 9,710.00 2,750.00 3.53 1.00
6/6/2022 10278 30-360 17,260.00 2,750.00 6.28 1.00
6/6/2022 10279 30-273 14,680.00 2,750.00 5.34 1.00
6/6/2022 10280 30-493 16,150.00 2,750.00 5.87 1.00
6/6/2022 10281 30-358 16,940.00 2,750.00 6.16 1.00
6/6/2022 10282 30-296 16,940.00 2,750.00 6.16 1.00
6/6/2022 10283 30-274 16,930.00 2,750.00 6.16 1.00
6/6/2022 10284 30-364 17,570.00 2,750.00 6.39 1.00
6/6/2022 10285 30-445 15,410.00 2,750.00 5.60 1.00
6/6/2022 10286 30-386 15,240.00 2,750.00 5.54 1.00
6/6/2022 10287 30-294 14,880.00 2,750.00 5.41 1.00
6/6/2022 10288 - 2,750.00 0.00 1.00
6/6/2022 10289 - 2,750.00 0.00 1.00
6/6/2022 10290 - 27,920.00 2,750.00 10.15 1.00
6/6/2022 10291 30-807 15,550.00 2,750.00 5.65 1.00
6/6/2022 10292 30-445 17,390.00 2,750.00 6.32 1.00
6/6/2022 10293 30-360 18,700.00 2,750.00 6.80 1.00
6/6/2022 10294 30-438 13,500.00 2,750.00 4.91 1.00
6/6/2022 10295 30-273 14,410.00 2,750.00 5.24 1.00
6/6/2022 10296 30-303 15,330.00 2,750.00 5.57 1.00
6/6/2022 10297 30-113 12,320.00 2,750.00 4.48 1.00
6/6/2022 10298 30-274 15,980.00 2,750.00 5.81 1.00
6/6/2022 10299 30-364 18,080.00 2,750.00 6.57 1.00
6/6/2022 10300 30-296 15,790.00 2,750.00 5.74 1.00
6/6/2022 10301 30-358 19,160.00 2,750.00 6.97 1.00
6/6/2022 10302 30-443 14,190.00 2,750.00 5.16 1.00
6/6/2022 10303 30-274 24,260.00 2,750.00 8.82 1.00
6/6/2022 10304 30-358 20,020.00 2,750.00 7.28 1.00
6/6/2022 10305 30-297 17,430.00 2,750.00 6.34 1.00
6/6/2022 10306 30-294 19,290.00 2,750.00 7.01 1.00
6/6/2022 10307 30-807 14,990.00 2,750.00 5.45 1.00
6/6/2022 10308 30-438 13,650.00 2,750.00 4.96 1.00
6/6/2022 10309 30-360 19,260.00 2,750.00 7.00 1.00
6/6/2022 10310 30-445 17,440.00 2,750.00 6.34 1.00
6/6/2022 10311 30-443 16,450.00 2,750.00 5.98 1.00
6/6/2022 10312 30-364 14,760.00 2,750.00 5.37 1.00
6/6/2022 10313 30-303 13,310.00 2,750.00 4.84 1.00
6/6/2022 10314 30-274 21,260.00 2,750.00 7.73 1.00
6/6/2022 10315 30-296 16,590.00 2,750.00 6.03 1.00
6/6/2022 10316 30-106 16,500.00 2,750.00 6.00 1.00
6/6/2022 10317 30-274 19,250.00 2,750.00 7.00 1.00
6/6/2022 10318 30-386 11,840.00 2,750.00 4.31 1.00
6/6/2022 10319 30-358 19,330.00 2,750.00 7.03 1.00
6/6/2022 10320 30-297 19,080.00 2,750.00 6.94 1.00
6/6/2022 10321 30-807 16,400.00 2,750.00 5.96 1.00
6/6/2022 10322 30-493 15,200.00 2,750.00 5.53 1.00
6/6/2022 10323 30-438 10,300.00 2,750.00 3.75 1.00
6/6/2022 10324 30-364 16,360.00 2,750.00 5.95 1.00
6/6/2022 10325 30-303 14,630.00 2,750.00 5.32 1.00
6/6/2022 10326 30-443 17,550.00 2,750.00 6.38 1.00
6/6/2022 10327 30-273 16,330.00 2,750.00 5.94 1.00
6/6/2022 10328 30-274 16,760.00 2,750.00 6.09 1.00
6/6/2022 10329 30-297 14,740.00 2,750.00 5.36 1.00
6/6/2022 10330 30-358 22,670.00 2,750.00 8.24 1.00
6/6/2022 10331 30-296 18,940.00 2,750.00 6.89 1.00
6/6/2022 10332 - 8,820.00 2,750.00 3.21 1.00
6/6/2022 10333 - 2,750.00 0.00 1.00
6/6/2022 10334 30-493 17,320.00 2,750.00 6.30 1.00
6/6/2022 10335 30-443 27,110.00 2,750.00 9.86 1.00
6/6/2022 10336 30-817 13,750.00 2,750.00 5.00 1.00
6/6/2022 10337 30-438 16,580.00 2,750.00 6.03 1.00
6/6/2022 10338 30-294 16,880.00 2,750.00 6.14 1.00
6/6/2022 10339 30-274 17,750.00 2,750.00 6.45 1.00
6/6/2022 10340 30-364 18,870.00 2,750.00 6.86 1.00
6/6/2022 10341 30-303 16,310.00 2,750.00 5.93 1.00
6/6/2022 10342 30-360 14,170.00 2,750.00 5.15 1.00
6/6/2022 10343 30-360 16,070.00 2,750.00 5.84 1.00
6/6/2022 10344 30-296 12,160.00 2,750.00 4.42 1.00
6/6/2022 10345 30-297 15,100.00 2,750.00 5.49 1.00
6/6/2022 10346 30-807 13,520.00 2,750.00 4.92 1.00
6/6/2022 10347 30-106 12,390.00 2,750.00 4.51 1.00
6/6/2022 10348 30-106 18,600.00 2,750.00 6.76 1.00
6/6/2022 10349 30-817 14,710.00 2,750.00 5.35 1.00
TOTALES 1,460,950.00 250,250.00 531.25 91.00
o Cabezas (85.65km)”

Estac.
Material
Destino
Bolon 30 - -36 30--36
Bolon 30 - -80 30--80
Bolon 30 - -49 30--49
Bolon 30 - -43 30--43
Bolon 30 - -36 30--36
Bolon 30 - -44 30--44
Bolon 30 - -30 30--30
Bolon 30 - -27 30--27
Bolon 30 - -29 30--29
Bolon 30 - -44 30--44
Bolon 30 - -36 30--36
Bolon 30 - -38 30--38
Bolon 30 - -80 30--80
Bolon 30 - -81 30--81
Bolon 30 - -29 30--29
Bolon 30 - -49 30--49
Bolon 30 - -30 30--30
Bolon 30 - -44 30--44
Bolon 30 - -43 30--43
Bolon 30 - -36 30--36
Bolon 30 - -27 30--27
Bolon 30 - -49 30--49
Bolon 30 - -35 30--35
Bolon 30 - -29 30--29
Bolon 30 - -27 30--27
Bolon 30 - -36 30--36
Bolon 30 - -44 30--44
Bolon 30 - -38 30--38
Bolon 30 - -29 30--29
Bolon - - --
Bolon - - --
Bolon - - --
Bolon 30 - -80 30--80
Bolon 30 - -44 30--44
Bolon 30 - -36 30--36
Bolon 30 - -43 30--43
Bolon 30 - -27 30--27
Bolon 30 - -30 30--30
Bolon 30 - -11 30--11
Bolon 30 - -27 30--27
Bolon 30 - -36 30--36
Bolon 30 - -29 30--29
Bolon 30 - -35 30--35
Bolon 30 - -44 30--44
Bolon 30 - -27 30--27
Bolon 30 - -35 30--35
Bolon 30 - -29 30--29
Bolon 30 - -29 30--29
Bolon 30 - -80 30--80
Bolon 30 - -43 30--43
Bolon 30 - -36 30--36
Bolon 30 - -44 30--44
Bolon 30 - -44 30--44
Bolon 30 - -36 30--36
Bolon 30 - -30 30--30
Bolon 30 - -27 30--27
Bolon 30 - -29 30--29
Bolon 30 - -10 30--10
Bolon 30 - -27 30--27
Bolon 30 - -38 30--38
Bolon 30 - -35 30--35
Bolon 30 - -29 30--29
Bolon 30 - -80 30--80
Bolon 30 - -49 30--49
Bolon 30 - -43 30--43
Bolon 30 - -36 30--36
Bolon 30 - -30 30--30
Bolon 30 - -44 30--44
Bolon 30 - -27 30--27
Bolon 30 - -27 30--27
Bolon 30 - -29 30--29
Bolon 30 - -35 30--35
Bolon 30 - -29 30--29
Bolon - - --
Bolon - - --
Bolon 30 - -49 30--49
Bolon 30 - -44 30--44
Bolon 30 - -81 30--81
Bolon 30 - -43 30--43
Bolon 30 - -29 30--29
Bolon 30 - -27 30--27
Bolon 30 - -36 30--36
Bolon 30 - -30 30--30
Bolon 30 - -36 30--36
Bolon 30 - -36 30--36
Bolon 30 - -29 30--29
Bolon 30 - -29 30--29
Bolon 30 - -80 30--80
Bolon 30 - -10 30--10
Bolon 30 - -10 30--10
Bolon 30 - -81 30--81
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/7/2022 10350 30303 15,580.00 2,750.00 5.67 1.00
6/7/2022 10351 30364 16,600.00 2,750.00 6.04 1.00
6/7/2022 10352 30297 17,600.00 2,750.00 6.40 1.00
6/7/2022 10353 30807 14,560.00 2,750.00 5.29 1.00
6/7/2022 10354 30106 13,590.00 2,750.00 4.94 1.00
6/7/2022 10355 30273 14,000.00 2,750.00 5.09 1.00
6/7/2022 10356 30360 14,900.00 2,750.00 5.42 1.00
6/7/2022 10357 30443 15,560.00 2,750.00 5.66 1.00
6/7/2022 10358 30274 17,090.00 2,750.00 6.21 1.00
6/7/2022 10359 30297 19,030.00 2,750.00 6.92 1.00
6/7/2022 10360 30807 14,320.00 2,750.00 5.21 1.00
6/7/2022 10361 30273 730.00 2,750.00 0.27 1.00
6/7/2022 10362 30358 20,850.00 2,750.00 7.58 1.00
6/7/2022 10363 30106 15,180.00 2,750.00 5.52 1.00
6/7/2022 10364 30443 15,810.00 2,750.00 5.75 1.00
6/7/2022 10365 30817 13,000.00 2,750.00 4.73 1.00
6/7/2022 10366 30243 18,010.00 2,750.00 6.55 1.00
6/7/2022 10367 30297 16,610.00 2,750.00 6.04 1.00
6/7/2022 10368 30807 15,490.00 2,750.00 5.63 1.00
6/7/2022 10369 30360 15,060.00 2,750.00 5.48 1.00
6/7/2022 10370 30364 20,950.00 2,750.00 7.62 1.00
6/7/2022 10371 30274 17,770.00 2,750.00 6.46 1.00
6/7/2022 10372 30303 17,310.00 2,750.00 6.29 1.00
6/7/2022 10373 30294 18,520.00 2,750.00 6.73 1.00
6/7/2022 10374 30297 17,460.00 2,750.00 6.35 1.00
6/7/2022 10375 30443 14,920.00 2,750.00 5.43 1.00
6/7/2022 10376 30360 17,000.00 2,750.00 6.18 1.00
6/7/2022 10377 30358 20,290.00 2,750.00 7.38 1.00
6/7/2022 10378 30807 13,160.00 2,750.00 4.79 1.00
6/7/2022 10379 30365 14,580.00 2,750.00 5.30 1.00
6/7/2022 10380 30106 11,520.00 2,750.00 4.19 1.00
6/7/2022 10381 30364 17,980.00 2,750.00 6.54 1.00
6/7/2022 10382 30243 15,290.00 2,750.00 5.56 1.00
6/7/2022 10383 30493 11,540.00 2,750.00 4.20 1.00
6/7/2022 10384 30474 13,010.00 2,750.00 4.73 1.00
6/7/2022 10385 3096 12,440.00 2,750.00 4.52 1.00
6/7/2022 10386 30274 13,770.00 2,750.00 5.01 1.00
6/7/2022 10387 30294 15,740.00 2,750.00 5.72 1.00
6/7/2022 10388 30153 13,770.00 2,750.00 5.01 1.00
6/7/2022 10389 30303 16,540.00 2,750.00 6.01 1.00
6/7/2022 10390 30807 14,040.00 2,750.00 5.11 1.00
6/7/2022 10391 30365 15,920.00 2,750.00 5.79 1.00
6/7/2022 10392 30125 13,960.00 2,750.00 5.08 1.00
6/7/2022 10393 30360 16,200.00 2,750.00 5.89 1.00
6/7/2022 10394 30294 13,230.00 2,750.00 4.81 1.00
6/7/2022 10395 30483 10,040.00 2,750.00 3.65 1.00
6/7/2022 10396 30443 14,490.00 2,750.00 5.27 1.00
6/7/2022 10397 30358 16,390.00 2,750.00 5.96 1.00
6/7/2022 10398 30445 10,920.00 2,750.00 3.97 1.00
TOTALES 742,320.00 134,750.00 269.93 49.00
o Cabezas (85.65km)”

Estac.
Material
Destino
Bolon 30 - 303 30-303
Bolon 30 - 364 30-364
Bolon 30 - 297 30-297
Bolon 30 - 807 30-807
Bolon 30 - 106 30-106
Bolon 30 - 273 30-273
Bolon 30 - 360 30-360
Bolon 30 - 443 30-443
Bolon 30 - 274 30-274
Bolon 30 - 297 30-297
Bolon 30 - 807 30-807
Bolon 30 - 273 30-273
Bolon 30 - 358 30-358
Bolon 30 - 106 30-106
Bolon 30 - 443 30-443
Bolon 30 - 817 30-817
Bolon 30 - 243 30-243
Bolon 30 - 297 30-297
Bolon 30 - 807 30-807
Bolon 30 - 360 30-360
Bolon 30 - 364 30-364
Bolon 30 - 274 30-274
Bolon 30 - 303 30-303
Bolon 30 - 294 30-294
Bolon 30 - 297 30-297
Bolon 30 - 443 30-443
Bolon 30 - 360 30-360
Bolon 30 - 358 30-358
Bolon 30 - 807 30-807
Bolon 30 - 365 30-365
Bolon 30 - 106 30-106
Bolon 30 - 364 30-364
Bolon 30 - 243 30-243
Bolon 30 - 493 30-493
Bolon 30 - 474 30-474
Bolon 30 - 96 30-96
Bolon 30 - 274 30-274
Bolon 30 - 294 30-294
Bolon 30 - 153 30-153
Bolon 30 - 303 30-303
Bolon 30 - 807 30-807
Bolon 30 - 365 30-365
Bolon 30 - 125 30-125
Bolon 30 - 360 30-360
Bolon 30 - 294 30-294
Bolon 30 - 483 30-483
Bolon 30 - 443 30-443
Bolon 30 - 358 30-358
Bolon 30 - 445 30-445
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/8/2022 10399 30365 15,660.00 2,750.00 5.69 1.00
6/8/2022 10400 30483 12,590.00 2,750.00 4.58 1.00
6/8/2022 10401 30807 13,510.00 2,750.00 4.91 1.00
6/8/2022 10402 30493 13,190.00 2,750.00 4.80 1.00
6/8/2022 10403 30817 13,650.00 2,750.00 4.96 1.00
6/8/2022 10404 30443 17,670.00 2,750.00 6.43 1.00
6/8/2022 10405 30445 16,660.00 2,750.00 6.06 1.00
6/8/2022 10406 30106 12,740.00 2,750.00 4.63 1.00
6/8/2022 10407 30274 21,260.00 2,750.00 7.73 1.00
6/8/2022 10408 3096 13,600.00 2,750.00 4.95 1.00
6/8/2022 10409 30273 20,400.00 2,750.00 7.42 1.00
6/8/2022 10410 30358 17,030.00 2,750.00 6.19 1.00
6/8/2022 10411 30474 11,850.00 2,750.00 4.31 1.00
6/8/2022 10412 30483 12,690.00 2,750.00 4.61 1.00
6/8/2022 10413 30364 15,580.00 2,750.00 5.67 1.00
6/8/2022 10414 30297 19,200.00 2,750.00 6.98 1.00
6/8/2022 10415 30303 13,330.00 2,750.00 4.85 1.00
6/8/2022 10416 30300 19,490.00 2,750.00 7.09 1.00
6/8/2022 10417 30125 10,510.00 2,750.00 3.82 1.00
6/8/2022 10418 30243 19,950.00 2,750.00 7.25 1.00
6/8/2022 10419 30294 17,950.00 2,750.00 6.53 1.00
6/8/2022 10420 30360 17,960.00 2,750.00 6.53 1.00
6/8/2022 10421 30365 16,220.00 2,750.00 5.90 1.00
6/8/2022 10422 30445 11,520.00 2,750.00 4.19 1.00
6/8/2022 10423 30443 14,880.00 2,750.00 5.41 1.00
6/8/2022 10424 30817 14,340.00 2,750.00 5.21 1.00
6/8/2022 10425 30335 9,630.00 2,750.00 3.50 1.00
6/8/2022 10426 30297 19,070.00 2,750.00 6.93 1.00
6/8/2022 10427 30274 19,640.00 2,750.00 7.14 1.00
6/8/2022 10428 30364 16,540.00 2,750.00 6.01 1.00
6/8/2022 10429 30358 18,030.00 2,750.00 6.56 1.00
6/8/2022 10430 30106 14,980.00 2,750.00 5.45 1.00
6/8/2022 10431 30243 20,910.00 2,750.00 7.60 1.00
6/8/2022 10432 30153 17,170.00 2,750.00 6.24 1.00
6/8/2022 10433 30493 14,100.00 2,750.00 5.13 1.00
6/8/2022 10434 30365 17,650.00 2,750.00 6.42 1.00
6/8/2022 10435 30243 15,800.00 2,750.00 5.75 1.00
6/8/2022 10436 30243 12,900.00 2,750.00 4.69 1.00
TOTALES 599,850.00 104,500.00 218.13 38.00
o Cabezas (85.65km)”

Estac.
Material
Destino
Bolon 30 - 365 30-365
Bolon 30 - 483 30-483
Bolon 30 - 807 30-807
Bolon 30 - 493 30-493
Bolon 30 - 817 30-817
Bolon 30 - 443 30-443
Bolon 30 - 445 30-445
Bolon 30 - 106 30-106
Bolon 30 - 274 30-274
Bolon 30 - 96 30-96
Bolon 30 - 273 30-273
Bolon 30 - 358 30-358
Bolon 30 - 474 30-474
Bolon 30 - 483 30-483
Bolon 30 - 364 30-364
Bolon 30 - 297 30-297
Bolon 30 - 303 30-303
Bolon 30 - 300 30-300
Bolon 30 - 125 30-125
Bolon 30 - 243 30-243
Bolon 30 - 294 30-294
Bolon 30 - 360 30-360
Bolon 30 - 365 30-365
Bolon 30 - 445 30-445
Bolon 30 - 443 30-443
Bolon 30 - 817 30-817
Bolon 30 - 335 30-335
Bolon 30 - 297 30-297
Bolon 30 - 274 30-274
Bolon 30 - 364 30-364
Bolon 30 - 358 30-358
Bolon 30 - 106 30-106
Bolon 30 - 243 30-243
Bolon 30 - 153 30-153
Bolon 30 - 493 30-493
Bolon 30 - 365 30-365
Bolon 30 - 243 30-243
Bolon 30 - 243 30-243
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/9/2022 10437 30296 18,790.00 2,750.00 6.83 1.00
6/9/2022 10438 30365 17,670.00 2,750.00 6.43 1.00
6/9/2022 10439 30294 18,600.00 2,750.00 6.76 1.00
6/9/2022 10440 30243 37,350.00 2,750.00 13.58 1.00
6/9/2022 10441 30273 19,610.00 2,750.00 7.13 1.00
6/9/2022 10442 30303 17,370.00 2,750.00 6.32 1.00
6/9/2022 10443 30300 18,990.00 2,750.00 6.91 1.00
TOTALES 148,380.00 19,250.00 53.96 7.00
– Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 296 30-296


Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/10/2022 10444 30--36 17,830.00 2,750.00 6.48 1.00
6/10/2022 10445 30--80 14,620.00 2,750.00 5.32 1.00
6/10/2022 10446 30--10 14,100.00 2,750.00 5.13 1.00
6/10/2022 10447 30-153 16,630.00 2,750.00 6.05 1.00
6/10/2022 10448 30-335 12,570.00 2,750.00 4.57 1.00
6/10/2022 10449 30-243 17,390.00 2,750.00 6.32 1.00
6/10/2022 10450 30-125 14,420.00 2,750.00 5.24 1.00
6/10/2022 10451 30-294 16,490.00 2,750.00 6.00 1.00
6/10/2022 10452 30-273 17,100.00 2,750.00 6.22 1.00
6/10/2022 10453 30-443 16,630.00 2,750.00 6.05 1.00
6/10/2022 10454 30-817 15,990.00 2,750.00 5.81 1.00
6/10/2022 10455 30-807 14,620.00 2,750.00 5.32 1.00
6/10/2022 10444 30-360 17,830.00 2,750.00 6.48 1.00
6/10/2022 10445 30-807 14,620.00 2,750.00 5.32 1.00
6/10/2022 10446 30-106 14,100.00 2,750.00 5.13 1.00
6/10/2022 10447 30--15 16,630.00 2,750.00 6.05 1.00
6/10/2022 10448 30--33 12,570.00 2,750.00 4.57 1.00
6/10/2022 10449 30--24 17,390.00 2,750.00 6.32 1.00
6/10/2022 10450 30--12 14,420.00 2,750.00 5.24 1.00
6/10/2022 10451 30--29 16,490.00 2,750.00 6.00 1.00
6/10/2022 10452 30--27 17,100.00 2,750.00 6.22 1.00
6/10/2022 10453 30--44 16,630.00 2,750.00 6.05 1.00
6/10/2022 10454 30--81 15,990.00 2,750.00 5.81 1.00
6/10/2022 10455 30--30 20,420.00 2,750.00 7.43 1.00
6/10/2022 10456 30--30 17,240.00 2,750.00 6.27 1.00
6/10/2022 10457 30--48 12,010.00 2,750.00 4.37 1.00
6/10/2022 10458 30--36 17,770.00 2,750.00 6.46 1.00
6/10/2022 10459 30--35 18,110.00 2,750.00 6.59 1.00
6/10/2022 10460 30--47 19,170.00 2,750.00 6.97 1.00
6/10/2022 10461 30--81 14,140.00 2,750.00 5.14 1.00
6/10/2022 10462 30--80 16,920.00 2,750.00 6.15 1.00
6/10/2022 10463 30--15 16,390.00 2,750.00 5.96 1.00
6/10/2022 10464 30--19 13,460.00 2,750.00 4.89 1.00
6/10/2022 10465 30--44 14,900.00 2,750.00 5.42 1.00
6/10/2022 10466 30--10 15,930.00 2,750.00 5.79 1.00
6/10/2022 10467 30--12 13,950.00 2,750.00 5.07 1.00
6/10/2022 10468 30--44 18,540.00 2,750.00 6.74 1.00
6/10/2022 10469 30--36 18,390.00 2,750.00 6.69 1.00
6/10/2022 10470 30--48 14,700.00 2,750.00 5.35 1.00
6/10/2022 10471 30--81 15,460.00 2,750.00 5.62 1.00
6/10/2022 10472 30--24 14,520.00 2,750.00 5.28 1.00
6/10/2022 10473 30--27 18,070.00 2,750.00 6.57 1.00
6/10/2022 10474 30--35 19,220.00 2,750.00 6.99 1.00
6/10/2022 10475 30--36 16,690.00 2,750.00 6.07 1.00
6/10/2022 10476 30--29 17,000.00 2,750.00 6.18 1.00
6/10/2022 10477 30--30 21,460.00 2,750.00 7.80 1.00
6/10/2022 10478 30--30 17,390.00 2,750.00 6.32 1.00
TOTALES 764,010.00 129,250.00 277.82 47.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - --3 30---3


Bolon CAMBIO LINEA WAWA 30 - --8 30---8
Bolon CAMBIO LINEA WAWA 30 - --1 30---1
Bolon CAMBIO LINEA WAWA 30 - -15 30--15
Bolon CAMBIO LINEA WAWA 30 - -33 30--33
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -12 30--12
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -80 30--80
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -80 30--80
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - --1 30---1
Bolon CAMBIO LINEA WAWA 30 - --3 30---3
Bolon CAMBIO LINEA WAWA 30 - --2 30---2
Bolon CAMBIO LINEA WAWA 30 - --1 30---1
Bolon CAMBIO LINEA WAWA 30 - --2 30---2
Bolon CAMBIO LINEA WAWA 30 - --2 30---2
Bolon CAMBIO LINEA WAWA 30 - --4 30---4
Bolon CAMBIO LINEA WAWA 30 - --8 30---8
Bolon CAMBIO LINEA WAWA 30 - --3 30---3
Bolon CAMBIO LINEA WAWA 30 - --3 30---3
Bolon CAMBIO LINEA WAWA 30 - --4 30---4
Bolon CAMBIO LINEA WAWA 30 - --3 30---3
Bolon CAMBIO LINEA WAWA 30 - --3 30---3
Bolon CAMBIO LINEA WAWA 30 - --4 30---4
Bolon CAMBIO LINEA WAWA 30 - --8 30---8
Bolon CAMBIO LINEA WAWA 30 - --8 30---8
Bolon CAMBIO LINEA WAWA 30 - --1 30---1
Bolon CAMBIO LINEA WAWA 30 - --1 30---1
Bolon CAMBIO LINEA WAWA 30 - --4 30---4
Bolon CAMBIO LINEA WAWA 30 - --1 30---1
Bolon CAMBIO LINEA WAWA 30 - --1 30---1
Bolon CAMBIO LINEA WAWA 30 - --4 30---4
Bolon CAMBIO LINEA WAWA 30 - --3 30---3
Bolon CAMBIO LINEA WAWA 30 - --4 30---4
Bolon CAMBIO LINEA WAWA 30 - --8 30---8
Bolon CAMBIO LINEA WAWA 30 - --2 30---2
Bolon CAMBIO LINEA WAWA 30 - --2 30---2
Bolon CAMBIO LINEA WAWA 30 - --3 30---3
Bolon CAMBIO LINEA WAWA 30 - --3 30---3
Bolon CAMBIO LINEA WAWA 30 - --2 30---2
Bolon CAMBIO LINEA WAWA 30 - --3 30---3
Bolon CAMBIO LINEA WAWA 30 - --3 30---3
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/11/2022 10479 30-358 21,000.00 2,750.00 7.64 1.00
6/11/2022 10480 30-153 17,420.00 2,750.00 6.33 1.00
6/11/2022 10481 30-300 17,170.00 2,750.00 6.24 1.00
6/11/2022 10482 30-273 17,620.00 2,750.00 6.41 1.00
6/11/2022 10483 30-807 19,540.00 2,750.00 7.11 1.00
6/11/2022 10484 30-364 17,270.00 2,750.00 6.28 1.00
6/11/2022 10485 30-365 16,540.00 2,750.00 6.01 1.00
6/11/2022 10486 30-360 18,170.00 2,750.00 6.61 1.00
6/11/2022 10487 30-303 13,930.00 2,750.00 5.07 1.00
6/11/2022 10488 30-274 16,460.00 2,750.00 5.99 1.00
6/11/2022 10489 30-294 20,010.00 2,750.00 7.28 1.00
6/11/2022 10490 30-358 18,980.00 2,750.00 6.90 1.00
6/11/2022 10491 30-273 19,030.00 2,750.00 6.92 1.00
6/11/2022 10492 30-364 19,910.00 2,750.00 7.24 1.00
6/11/2022 10493 30-300 19,770.00 2,750.00 7.19 1.00
6/11/2022 10494 30-303 15,570.00 2,750.00 5.66 1.00
6/11/2022 10495 30-360 19,070.00 2,750.00 6.93 1.00
6/11/2022 10496 30-365 19,280.00 2,750.00 7.01 1.00
6/11/2022 10497 30-365 19,280.00 2,750.00 7.01 1.00
6/11/2022 10498 30-358 20,070.00 2,750.00 7.30 1.00
6/11/2022 10499 30-817 15,700.00 2,750.00 5.71 1.00
6/11/2022 10500 30-294 19,620.00 2,750.00 7.13 1.00
6/11/2022 10501 30-300 18,800.00 2,750.00 6.84 1.00
6/11/2022 10502 30-273 19,020.00 2,750.00 6.92 1.00
6/11/2022 10503 30-493 15,490.00 2,750.00 5.63 1.00
6/11/2022 10504 30-144 14,190.00 2,750.00 5.16 1.00
6/11/2022 10505 30-303 16,390.00 2,750.00 5.96 1.00
6/11/2022 10506 39-358 20,030.00 2,750.00 7.28 1.00
6/11/2022 10507 30-365 15,800.00 2,750.00 5.75 1.00
6/11/2022 10508 30-106 16,280.00 2,750.00 5.92 1.00
6/11/2022 10509 30-300 18,730.00 2,750.00 6.81 1.00
6/11/2022 10510 30-133 12,330.00 2,750.00 4.48 1.00
6/11/2022 10511 30-294 17,860.00 2,750.00 6.49 1.00
6/11/2022 10512 30-303 17,580.00 2,750.00 6.39 1.00
6/11/2022 10513 30-360 19,150.00 2,750.00 6.96 1.00
6/11/2022 10514 30-273 17,360.00 2,750.00 6.31 1.00
6/11/2022 10515 30-807 14,990.00 2,750.00 5.45 1.00
6/11/2022 10516 30-365 15,640.00 2,750.00 5.69 1.00
6/11/2022 10517 30-364 19,790.00 2,750.00 7.20 1.00
6/11/2022 10518 30-358 19,410.00 2,750.00 7.06 1.00
6/11/2022 10519 30-443 17,100.00 2,750.00 6.22 1.00
6/11/2022 10520 30-300 20,690.00 2,750.00 7.52 1.00
6/11/2022 10521 30-294 15,390.00 2,750.00 5.60 1.00
6/11/2022 10522 30-133 10,870.00 2,750.00 3.95 1.00
TOTALES 774,300.00 121,000.00 281.56 44.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - -35 30--35


Bolon CAMBIO LINEA WAWA 30 - -15 30--15
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -80 30--80
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -49 30--49
Bolon CAMBIO LINEA WAWA 30 - -14 30--14
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 39 - -35 39--35
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -80 30--80
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/12/2022 10523 30-365 17,780.00 2,750.00 6.47 1.00
6/12/2022 10524 30-303 14,840.00 2,750.00 5.40 1.00
6/12/2022 10525 30-364 15,720.00 2,750.00 5.72 1.00
6/12/2022 10526 30-300 18,570.00 2,750.00 6.75 1.00
6/12/2022 10527 30-817 13,670.00 2,750.00 4.97 1.00
6/12/2022 10528 30-345 15,680.00 2,750.00 5.70 1.00
6/12/2022 10529 30-360 18,840.00 2,750.00 6.85 1.00
6/12/2022 10530 30-358 20,120.00 2,750.00 7.32 1.00
6/12/2022 10531 30-294 20,940.00 2,750.00 7.61 1.00
6/12/2022 10532 30-474 14,840.00 2,750.00 5.40 1.00
6/12/2022 10533 30-125 16,360.00 2,750.00 5.95 1.00
6/12/2022 10534 30-443 19,040.00 2,750.00 6.92 1.00
6/12/2022 10535 30-273 15,520.00 2,750.00 5.64 1.00
6/12/2022 10536 30-96 15,190.00 2,750.00 5.52 1.00
6/12/2022 10537 30-483 12,510.00 2,750.00 4.55 1.00
6/12/2022 10538 30-365 17,340.00 2,750.00 6.31 1.00
6/12/2022 10539 30-335 8,110.00 2,750.00 2.95 1.00
6/12/2022 10540 30-303 18,910.00 2,750.00 6.88 1.00
6/12/2022 10541 30-164 12,230.00 2,750.00 4.45 1.00
6/12/2022 10542 30-133 11,710.00 2,750.00 4.26 1.00
6/12/2022 10543 30-817 12,780.00 2,750.00 4.65 1.00
6/12/2022 10544 30-445 11,760.00 2,750.00 4.28 1.00
6/12/2022 10545 30-807 17,210.00 2,750.00 6.26 1.00
6/12/2022 10546 30-300 15,050.00 2,750.00 5.47 1.00
6/12/2022 10547 30-364 19,190.00 2,750.00 6.98 1.00
6/12/2022 10548 30-358 18,540.00 2,750.00 6.74 1.00
6/12/2022 10549 30-275 18,510.00 2,750.00 6.73 1.00
6/12/2022 10550 30-360 17,430.00 2,750.00 6.34 1.00
6/12/2022 10551 30-125 11,230.00 2,750.00 4.08 1.00
6/12/2022 10552 30-96 13,740.00 2,750.00 5.00 1.00
6/12/2022 10553 30-273 15,610.00 2,750.00 5.68 1.00
6/12/2022 10554 30-474 14,860.00 2,750.00 5.40 1.00
6/12/2022 10555 30-483 12,310.00 2,750.00 4.48 1.00
6/12/2022 10556 30-443 14,370.00 2,750.00 5.23 1.00
6/12/2022 10557 30-345 11,440.00 2,750.00 4.16 1.00
6/12/2022 10558 30-335 11,390.00 2,750.00 4.14 1.00
6/12/2022 10559 30-365 17,360.00 2,750.00 6.31 1.00
6/12/2022 10560 30-817 12,510.00 2,750.00 4.55 1.00
6/12/2022 10561 30-364 18,070.00 2,750.00 6.57 1.00
6/12/2022 10562 30-358 18,940.00 2,750.00 6.89 1.00
6/12/2022 10563 30-125 17,660.00 2,750.00 6.42 1.00
6/12/2022 10564 30-360 22,030.00 2,750.00 8.01 1.00
6/12/2022 10565 30-273 19,440.00 2,750.00 7.07 1.00
6/12/2022 10566 30-96 16,760.00 2,750.00 6.09 1.00
6/12/2022 10567 30-273 19,440.00 2,750.00 7.07 1.00
6/12/2022 10568 30-96 16,760.00 2,750.00 6.09 1.00
6/12/2022 10569 30-443 17,100.00 2,750.00 6.22 1.00
6/12/2022 10570 30-294 17,230.00 2,750.00 6.27 1.00
6/12/2022 10571 30-133 10,160.00 2,750.00 3.69 1.00
6/12/2022 10572 30-303 14,990.00 2,750.00 5.45 1.00
6/12/2022 10573 30-474 21,170.00 2,750.00 7.70 1.00
6/12/2022 10574 30-365 17,970.00 2,750.00 6.53 1.00
6/12/2022 10575 30-164 13,970.00 2,750.00 5.08 1.00
6/12/2022 10576 30-807 16,630.00 2,750.00 6.05 1.00
6/12/2022 10577 30-300 20,950.00 2,750.00 7.62 1.00
6/12/2022 10578 30-364 19,030.00 2,750.00 6.92 1.00
6/12/2022 10579 30-817 15,430.00 2,750.00 5.61 1.00
6/12/2022 10580 30-275 21,490.00 2,750.00 7.81 1.00
6/12/2022 10581 30-335 13,890.00 2,750.00 5.05 1.00
6/12/2022 10582 30-106 13,370.00 2,750.00 4.86 1.00
6/12/2022 10583 30-358 20,950.00 2,750.00 7.62 1.00
TOTALES 986,640.00 167,750.00 358.79 61.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - -36 30--36


Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -34 30--34
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -47 30--47
Bolon CAMBIO LINEA WAWA 30 - -12 30--12
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -96 30--96
Bolon CAMBIO LINEA WAWA 30 - -48 30--48
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -33 30--33
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -16 30--16
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -80 30--80
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -12 30--12
Bolon CAMBIO LINEA WAWA 30 - -96 30--96
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -47 30--47
Bolon CAMBIO LINEA WAWA 30 - -48 30--48
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -34 30--34
Bolon CAMBIO LINEA WAWA 30 - -33 30--33
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -12 30--12
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -96 30--96
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -96 30--96
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -47 30--47
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -16 30--16
Bolon CAMBIO LINEA WAWA 30 - -80 30--80
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -33 30--33
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/13/2022 10584 30-273 17,470.00 2,750.00 6.35 1.00
6/13/2022 10585 30-303 19,270.00 2,750.00 7.01 1.00
6/13/2022 10586 30-133 14,200.00 2,750.00 5.16 1.00
6/13/2022 10587 30-294 20,980.00 2,750.00 7.63 1.00
6/13/2022 10588 30-364 23,110.00 2,750.00 8.40 1.00
6/13/2022 10589 30-296 15,680.00 2,750.00 5.70 1.00
6/13/2022 10590 30-807 17,790.00 2,750.00 6.47 1.00
6/13/2022 10591 30-360 18,360.00 2,750.00 6.68 1.00
6/13/2022 10592 30-445 17,770.00 2,750.00 6.46 1.00
6/13/2022 10593 30-817 14,030.00 2,750.00 5.10 1.00
6/13/2022 10594 30-443 18,520.00 2,750.00 6.73 1.00
6/13/2022 10595 30-164 12,990.00 2,750.00 4.72 1.00
6/13/2022 10596 30-275 22,190.00 2,750.00 8.07 1.00
6/13/2022 10597 30-297 17,320.00 2,750.00 6.30 1.00
6/13/2022 10598 30-106 12,520.00 2,750.00 4.55 1.00
6/13/2022 10599 30-273 18,990.00 2,750.00 6.91 1.00
6/13/2022 10600 30-303 16,950.00 2,750.00 6.16 1.00
6/13/2022 10601 30-294 15,980.00 2,750.00 5.81 1.00
6/13/2022 10602 30-364 21,330.00 2,750.00 7.76 1.00
6/13/2022 10603 30-358 23,870.00 2,750.00 8.68 1.00
6/13/2022 10604 30-373 15,910.00 2,750.00 5.79 1.00
6/13/2022 10605 30-296 16,000.00 2,750.00 5.82 1.00
6/13/2022 10606 30-445 17,590.00 2,750.00 6.40 1.00
6/13/2022 10607 30-360 20,410.00 2,750.00 7.42 1.00
6/13/2022 10608 30-817 12,130.00 2,750.00 4.41 1.00
6/13/2022 10609 30-275 20,470.00 2,750.00 7.44 1.00
6/13/2022 10610 30-443 14,010.00 2,750.00 5.09 1.00
6/13/2022 10611 30-297 19,820.00 2,750.00 7.21 1.00
6/13/2022 10612 30-164 11,400.00 2,750.00 4.15 1.00
6/13/2022 10613 30-273 23,900.00 2,750.00 8.69 1.00
6/13/2022 10614 30-303 17,340.00 2,750.00 6.31 1.00
6/13/2022 10615 30-294 18,650.00 2,750.00 6.78 1.00
6/13/2022 10616 30-364 18,350.00 2,750.00 6.67 1.00
6/13/2022 10617 30-358 18,610.00 2,750.00 6.77 1.00
6/13/2022 10618 30-106 13,530.00 2,750.00 4.92 1.00
6/13/2022 10619 30-373 18,010.00 2,750.00 6.55 1.00
6/13/2022 10620 30-445 12,920.00 2,750.00 4.70 1.00
6/13/2022 10621 30-296 17,640.00 2,750.00 6.41 1.00
6/13/2022 10622 30-125 15,980.00 2,750.00 5.81 1.00
6/13/2022 10623 30-335 12,620.00 2,750.00 4.59 1.00
6/13/2022 10624 30-730 15,140.00 2,750.00 5.51 1.00
6/13/2022 10625 30-275 3,390.00 2,750.00 1.23 1.00
6/13/2022 10626 30-443 14,670.00 2,750.00 5.33 1.00
6/13/2022 10627 30-360 20,310.00 2,750.00 7.39 1.00
6/13/2022 10628 30-297 17,430.00 2,750.00 6.34 1.00
6/13/2022 10629 30-358 14,190.00 2,750.00 5.16 1.00
6/13/2022 10630 30-144 14,360.00 2,750.00 5.22 1.00
6/13/2022 10631 30-164 13,210.00 2,750.00 4.80 1.00
6/13/2022 10632 30-817 12,980.00 2,750.00 4.72 1.00
6/13/2022 10633 30-294 13,210.00 2,750.00 4.80 1.00
6/13/2022 10634 30-364 14,240.00 2,750.00 5.18 1.00
6/13/2022 10635 30-273 17,670.00 2,750.00 6.43 1.00
6/13/2022 10636 30-373 18,800.00 2,750.00 6.84 1.00
6/13/2022 10637 30-445 17,010.00 2,750.00 6.19 1.00
6/13/2022 10638 30-807 14,670.00 2,750.00 5.33 1.00
6/13/2022 10639 30-483 16,060.00 2,750.00 5.84 1.00
6/13/2022 10640 30-335 18,710.00 2,750.00 6.80 1.00
6/13/2022 10641 30-294 17,590.00 2,750.00 6.40 1.00
6/13/2022 10642 30-106 14,370.00 2,750.00 5.23 1.00
6/13/2022 10643 30-443 15,900.00 2,750.00 5.78 1.00
6/13/2022 10644 30-125 14,830.00 2,750.00 5.39 1.00
6/13/2022 10645 30-303 17,150.00 2,750.00 6.24 1.00
6/13/2022 10646 30-296 18,580.00 2,750.00 6.76 1.00
6/13/2022 10647 30-297 19,230.00 2,750.00 6.99 1.00
6/13/2022 10648 30-358 19,510.00 2,750.00 7.09 1.00
6/13/2022 10649 30-360 18,040.00 2,750.00 6.56 1.00
6/13/2022 10650 30-144 17,550.00 2,750.00 6.38 1.00
6/13/2022 10651 30-275 17,430.00 2,750.00 6.34 1.00
6/13/2022 10652 30-817 15,220.00 2,750.00 5.53 1.00
6/13/2022 10653 30-273 19,190.00 2,750.00 6.98 1.00
6/13/2022 10654 30-807 17,350.00 2,750.00 6.31 1.00
6/13/2022 10655 30-487 14,120.00 2,750.00 5.13 1.00
6/13/2022 10656 30-373 16,460.00 2,750.00 5.99 1.00
6/13/2022 10657 30-294 16,140.00 2,750.00 5.87 1.00
TOTALES 1,239,320.00 203,500.00 450.66 74.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - -27 30--27


Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -80 30--80
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -16 30--16
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -37 30--37
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -16 30--16
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -37 30--37
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -12 30--12
Bolon CAMBIO LINEA WAWA 30 - -33 30--33
Bolon CAMBIO LINEA WAWA 30 - -73 30--73
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -14 30--14
Bolon CAMBIO LINEA WAWA 30 - -16 30--16
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -37 30--37
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -80 30--80
Bolon CAMBIO LINEA WAWA 30 - -48 30--48
Bolon CAMBIO LINEA WAWA 30 - -33 30--33
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -12 30--12
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -14 30--14
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -80 30--80
Bolon CAMBIO LINEA WAWA 30 - -48 30--48
Bolon CAMBIO LINEA WAWA 30 - -37 30--37
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/14/2022 10658 30-303 19,300.00 2,750.00 7.02 1.00
6/14/2022 10659 30-358 20,310.00 2,750.00 7.39 1.00
6/14/2022 10660 30-360 22,480.00 2,750.00 8.17 1.00
6/14/2022 10661 30-364 15,900.00 2,750.00 5.78 1.00
6/14/2022 10662 30-445 16,610.00 2,750.00 6.04 1.00
6/14/2022 10663 30-164 11,580.00 2,750.00 4.21 1.00
6/14/2022 10664 30-807 2,560.00 2,750.00 0.93 1.00
6/14/2022 10665 30-96 16,920.00 2,750.00 6.15 1.00
6/14/2022 10666 30-373 19,480.00 2,750.00 7.08 1.00
6/14/2022 10667 30-345 14,500.00 2,750.00 5.27 1.00
6/14/2022 10668 30-817 13,110.00 2,750.00 4.77 1.00
6/14/2022 10669 30-275 17,990.00 2,750.00 6.54 1.00
6/14/2022 10670 30-443 18,300.00 2,750.00 6.65 1.00
6/14/2022 10671 30-193 13,090.00 2,750.00 4.76 1.00
6/14/2022 10672 30-106 15,560.00 2,750.00 5.66 1.00
6/14/2022 10673 30-730 17,620.00 2,750.00 6.41 1.00
6/14/2022 10674 30-297 20,710.00 2,750.00 7.53 1.00
6/14/2022 10675 30-274 20,250.00 2,750.00 7.36 1.00
6/14/2022 10676 30-360 19,460.00 2,750.00 7.08 1.00
6/14/2022 10677 30-303 14,360.00 2,750.00 5.22 1.00
6/14/2022 10678 30-358 20,350.00 2,750.00 7.40 1.00
6/14/2022 10679 30-365 18,150.00 2,750.00 6.60 1.00
6/14/2022 10680 30-273 17,870.00 2,750.00 6.50 1.00
6/14/2022 10681 30-364 19,860.00 2,750.00 7.22 1.00
6/14/2022 10682 30-445 20,280.00 2,750.00 7.37 1.00
6/14/2022 10683 30-164 10,760.00 2,750.00 3.91 1.00
6/14/2022 10684 30-345 17,880.00 2,750.00 6.50 1.00
6/14/2022 10685 30-96 14,190.00 2,750.00 5.16 1.00
6/14/2022 10686 30-335 11,170.00 2,750.00 4.06 1.00
6/14/2022 10687 30-275 16,320.00 2,750.00 5.93 1.00
6/14/2022 10688 30-817 13,180.00 2,750.00 4.79 1.00
6/14/2022 10689 30-125 16,280.00 2,750.00 5.92 1.00
6/14/2022 10690 30-730 15,660.00 2,750.00 5.69 1.00
6/14/2022 10691 30-106 14,950.00 2,750.00 5.44 1.00
6/14/2022 10692 30-193 14,370.00 2,750.00 5.23 1.00
6/14/2022 10693 30-483 13,250.00 2,750.00 4.82 1.00
6/14/2022 10694 30-274 19,090.00 2,750.00 6.94 1.00
6/14/2022 10695 30-294 18,190.00 2,750.00 6.61 1.00
6/14/2022 10696 30-365 19,560.00 2,750.00 7.11 1.00
6/14/2022 10697 30-443 18,430.00 2,750.00 6.70 1.00
6/14/2022 10698 30-299 17,390.00 2,750.00 6.32 1.00
6/14/2022 10699 30-122 15,310.00 2,750.00 5.57 1.00
6/14/2022 10700 30-358 17,730.00 2,750.00 6.45 1.00
6/14/2022 10701 30-303 19,080.00 2,750.00 6.94 1.00
6/14/2022 10702 30-273 19,520.00 2,750.00 7.10 1.00
6/14/2022 10703 30-364 18,460.00 2,750.00 6.71 1.00
6/14/2022 10704 30-164 11,810.00 2,750.00 4.29 1.00
6/14/2022 10705 30-345 12,590.00 2,750.00 4.58 1.00
6/14/2022 10706 30-445 15,490.00 2,750.00 5.63 1.00
6/14/2022 10707 30-443 15,450.00 2,750.00 5.62 1.00
6/14/2022 10708 30-817 14,090.00 2,750.00 5.12 1.00
6/14/2022 10709 30-358 20,000.00 2,750.00 7.27 1.00
6/14/2022 10710 30-299 17,000.00 2,750.00 6.18 1.00
6/14/2022 10711 30-483 16,360.00 2,750.00 5.95 1.00
6/14/2022 10712 30-275 17,040.00 2,750.00 6.20 1.00
6/14/2022 10713 30-106 14,290.00 2,750.00 5.20 1.00
6/14/2022 10714 30-193 14,240.00 2,750.00 5.18 1.00
6/14/2022 10715 30-730 12,950.00 2,750.00 4.71 1.00
6/14/2022 10716 30-365 18,040.00 2,750.00 6.56 1.00
6/14/2022 10717 30-360 19,690.00 2,750.00 7.16 1.00
6/14/2022 10718 30-303 15,730.00 2,750.00 5.72 1.00
6/14/2022 10719 30-296 17,230.00 2,750.00 6.27 1.00
6/14/2022 10720 30-335 9,320.00 2,750.00 3.39 1.00
6/14/2022 10721 30-122 15,020.00 2,750.00 5.46 1.00
6/14/2022 10722 30-274 19,700.00 2,750.00 7.16 1.00
6/14/2022 10723 30-373 16,320.00 2,750.00 5.93 1.00
6/14/2022 10724 30-273 17,380.00 2,750.00 6.32 1.00
TOTALES 1,097,110.00 184,250.00 398.91 67.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - -30 30--30


Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -16 30--16
Bolon CAMBIO LINEA WAWA 30 - -80 30--80
Bolon CAMBIO LINEA WAWA 30 - -96 30--96
Bolon CAMBIO LINEA WAWA 30 - -37 30--37
Bolon CAMBIO LINEA WAWA 30 - -34 30--34
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -19 30--19
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -73 30--73
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -16 30--16
Bolon CAMBIO LINEA WAWA 30 - -34 30--34
Bolon CAMBIO LINEA WAWA 30 - -96 30--96
Bolon CAMBIO LINEA WAWA 30 - -33 30--33
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -12 30--12
Bolon CAMBIO LINEA WAWA 30 - -73 30--73
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -19 30--19
Bolon CAMBIO LINEA WAWA 30 - -48 30--48
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -12 30--12
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -16 30--16
Bolon CAMBIO LINEA WAWA 30 - -34 30--34
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -48 30--48
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -19 30--19
Bolon CAMBIO LINEA WAWA 30 - -73 30--73
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -33 30--33
Bolon CAMBIO LINEA WAWA 30 - -12 30--12
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -37 30--37
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/15/2022 10725 30-274 18,380.00 2,750.00 6.68 1.00
6/15/2022 10726 30-483 14,860.00 2,750.00 5.40 1.00
6/15/2022 10727 30-817 14,280.00 2,750.00 5.19 1.00
6/15/2022 10728 30-294 17,850.00 2,750.00 6.49 1.00
6/15/2022 10729 30-730 15,540.00 2,750.00 5.65 1.00
6/15/2022 10730 30-358 22,880.00 2,750.00 8.32 1.00
6/15/2022 10731 30-303 17,570.00 2,750.00 6.39 1.00
6/15/2022 10732 30-122 13,570.00 2,750.00 4.93 1.00
6/15/2022 10733 30-164 9,290.00 2,750.00 3.38 1.00
6/15/2022 10734 30-299 17,220.00 2,750.00 6.26 1.00
6/15/2022 10735 30-193 13,140.00 2,750.00 4.78 1.00
6/15/2022 10736 30-125 16,040.00 2,750.00 5.83 1.00
6/15/2022 10737 30-273 17,850.00 2,750.00 6.49 1.00
6/15/2022 10738 30-296 17,850.00 2,750.00 6.49 1.00
6/15/2022 10739 30-296 21,360.00 2,750.00 7.77 1.00
6/15/2022 10740 30-106 14,430.00 2,750.00 5.25 1.00
6/15/2022 10741 30-373 16,930.00 2,750.00 6.16 1.00
6/15/2022 10742 30-275 19,950.00 2,750.00 7.25 1.00
6/15/2022 10743 30-364 17,970.00 2,750.00 6.53 1.00
6/15/2022 10744 30-345 13,360.00 2,750.00 4.86 1.00
6/15/2022 10745 30-445 17,220.00 2,750.00 6.26 1.00
6/15/2022 10746 30-335 15,070.00 2,750.00 5.48 1.00
6/15/2022 10747 30-365 17,730.00 2,750.00 6.45 1.00
6/15/2022 10748 30-243 22,170.00 2,750.00 8.06 1.00
6/15/2022 10749 30-153 15,210.00 2,750.00 5.53 1.00
6/15/2022 10750 30-448 17,200.00 2,750.00 6.25 1.00
6/15/2022 10751 30-294 19,690.00 2,750.00 7.16 1.00
6/15/2022 10752 30-358 25,590.00 2,750.00 9.31 1.00
6/15/2022 10753 30-303 15,720.00 2,750.00 5.72 1.00
6/15/2022 10754 30-299 16,480.00 2,750.00 5.99 1.00
6/15/2022 10755 30-273 20,740.00 2,750.00 7.54 1.00
6/15/2022 10756 30-296 19,430.00 2,750.00 7.07 1.00
6/15/2022 10757 30-360 15,910.00 2,750.00 5.79 1.00
6/15/2022 10758 30-275 19,930.00 2,750.00 7.25 1.00
6/15/2022 10759 30-365 15,520.00 2,750.00 5.64 1.00
6/15/2022 10760 30-294 16,580.00 2,750.00 6.03 1.00
6/15/2022 10761 30-294 16,580.00 2,750.00 6.03 1.00
6/15/2022 10762 30-273 18,370.00 2,750.00 6.68 1.00
6/15/2022 10763 30-358 16,370.00 2,750.00 5.95 1.00
6/15/2022 10764 30-360 16,230.00 2,750.00 5.90 1.00
6/15/2022 10765 30-275 16,790.00 2,750.00 6.11 1.00
6/15/2022 10766 30-299 15,810.00 2,750.00 5.75 1.00
6/15/2022 10767 30-296 17,960.00 2,750.00 6.53 1.00
TOTALES 738,620.00 118,250.00 268.58 43.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - -27 30--27


Bolon CAMBIO LINEA WAWA 30 - -48 30--48
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -73 30--73
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -12 30--12
Bolon CAMBIO LINEA WAWA 30 - -16 30--16
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -19 30--19
Bolon CAMBIO LINEA WAWA 30 - -12 30--12
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -37 30--37
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -34 30--34
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -33 30--33
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -15 30--15
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/17/2022 10768 30-365 15,090.00 2,750.00 5.49 1.00
6/17/2022 10769 30-360 17,130.00 2,750.00 6.23 1.00
6/17/2022 10770 30-274 13,330.00 2,750.00 4.85 1.00
6/17/2022 10771 30-303 18,690.00 2,750.00 6.80 1.00
6/17/2022 10772 30-300 16,950.00 2,750.00 6.16 1.00
6/17/2022 10773 30-275 17,850.00 2,750.00 6.49 1.00
6/17/2022 10774 30-273 18,280.00 2,750.00 6.65 1.00
6/17/2022 10775 30-106 13,540.00 2,750.00 4.92 1.00
6/17/2022 10776 30-299 17,580.00 2,750.00 6.39 1.00
6/17/2022 10777 30-474 15,440.00 2,750.00 5.61 1.00
6/17/2022 10778 30-358 14,690.00 2,750.00 5.34 1.00
6/17/2022 10779 30-365 17,320.00 2,750.00 6.30 1.00
6/17/2022 10780 30-296 18,500.00 2,750.00 6.73 1.00
6/17/2022 10781 30-817 10,730.00 2,750.00 3.90 1.00
6/17/2022 10782 30-443 16,300.00 2,750.00 5.93 1.00
6/17/2022 10783 30-360 17,780.00 2,750.00 6.47 1.00
TOTALES 259,200.00 44,000.00 94.26 16.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - -36 30--36


Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -47 30--47
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/18/2022 10784 30-817 11,560.00 2,750.00 4.20 1.00
6/18/2022 10785 30-303 16,510.00 2,750.00 6.00 1.00
6/18/2022 10786 30-273 16,410.00 2,750.00 5.97 1.00
6/18/2022 10787 30-275 18,210.00 2,750.00 6.62 1.00
6/18/2022 10788 30-294 16,710.00 2,750.00 6.08 1.00
6/18/2022 10789 30-364 18,430.00 2,750.00 6.70 1.00
6/18/2022 10790 30-365 16,770.00 2,750.00 6.10 1.00
6/18/2022 10791 30-299 16,590.00 2,750.00 6.03 1.00
6/18/2022 10792 30-358 23,690.00 2,750.00 8.61 1.00
6/18/2022 10793 30-303 15,160.00 2,750.00 5.51 1.00
6/18/2022 10794 30-274 16,140.00 2,750.00 5.87 1.00
6/18/2022 10795 30-360 18,280.00 2,750.00 6.65 1.00
6/18/2022 10796 30-358 20,080.00 2,750.00 7.30 1.00
6/18/2022 10797 30-275 17,720.00 2,750.00 6.44 1.00
6/18/2022 10798 30-273 18,470.00 2,750.00 6.72 1.00
6/18/2022 10799 30-294 17,910.00 2,750.00 6.51 1.00
6/18/2022 10800 30-299 17,490.00 2,750.00 6.36 1.00
6/18/2022 10801 30-360 17,990.00 2,750.00 6.54 1.00
6/18/2022 10802 30-365 17,880.00 2,750.00 6.50 1.00
6/18/2022 10803 30-365 17,740.00 2,750.00 6.45 1.00
6/18/2022 10804 30-443 17,970.00 2,750.00 6.53 1.00
6/18/2022 10805 30-364 15,210.00 2,750.00 5.53 1.00
6/18/2022 10806 30-448 16,980.00 2,750.00 6.17 1.00
6/18/2022 10807 30-730 13,830.00 2,750.00 5.03 1.00
6/18/2022 10808 30-106 14,340.00 2,750.00 5.21 1.00
6/18/2022 10809 30-360 18,340.00 2,750.00 6.67 1.00
6/18/2022 10810 30-294 15,720.00 2,750.00 5.72 1.00
6/18/2022 10811 30-274 18,290.00 2,750.00 6.65 1.00
6/18/2022 10812 30-817 13,900.00 2,750.00 5.05 1.00
6/18/2022 10813 30-364 20,070.00 2,750.00 7.30 1.00
6/18/2022 10814 30-296 16,360.00 2,750.00 5.95 1.00
6/18/2022 10815 30-303 16,590.00 2,750.00 6.03 1.00
6/18/2022 10816 30-360 17,190.00 2,750.00 6.25 1.00
6/18/2022 10817 30-274 20,460.00 2,750.00 7.44 1.00
6/18/2022 10818 30-106 13,460.00 2,750.00 4.89 1.00
6/18/2022 10819 30-125 15,090.00 2,750.00 5.49 1.00
6/18/2022 10820 30-364 18,360.00 2,750.00 6.68 1.00
6/18/2022 10821 30-273 21,790.00 2,750.00 7.92 1.00
6/18/2022 10822 30-817 13,660.00 2,750.00 4.97 1.00
TOTALES 667,350.00 107,250.00 242.64 39.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - -81 30--81


Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -73 30--73
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -12 30--12
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/19/2022 10823 30-364 16,760.00 2,750.00 6.09 1.00
6/19/2022 10824 30-303 17,890.00 2,750.00 6.51 1.00
6/19/2022 10825 30-294 20,020.00 2,750.00 7.28 1.00
6/19/2022 10826 30-299 16,670.00 2,750.00 6.06 1.00
6/19/2022 10827 30-358 18,990.00 2,750.00 6.91 1.00
6/19/2022 10828 30-274 19,360.00 2,750.00 7.04 1.00
6/19/2022 10829 30-300 17,120.00 2,750.00 6.23 1.00
6/19/2022 10830 30-296 18,390.00 2,750.00 6.69 1.00
6/19/2022 10831 30-360 16,720.00 2,750.00 6.08 1.00
6/19/2022 10832 30-364 17,980.00 2,750.00 6.54 1.00
6/19/2022 10833 30-303 15,360.00 2,750.00 5.59 1.00
6/19/2022 10834 30-294 17,150.00 2,750.00 6.24 1.00
6/19/2022 10835 30-299 17,610.00 2,750.00 6.40 1.00
6/19/2022 10836 30-358 19,340.00 2,750.00 7.03 1.00
6/19/2022 10837 30-274 17,270.00 2,750.00 6.28 1.00
6/19/2022 10838 30-296 19,390.00 2,750.00 7.05 1.00
6/19/2022 10839 30-273 16,150.00 2,750.00 5.87 1.00
6/19/2022 10840 30-303 19,600.00 2,750.00 7.13 1.00
6/19/2022 10841 30-364 16,660.00 2,750.00 6.06 1.00
6/19/2022 10842 30-360 20,090.00 2,750.00 7.31 1.00
6/19/2022 10843 30-296 17,650.00 2,750.00 6.42 1.00
6/19/2022 10844 30-299 17,310.00 2,750.00 6.29 1.00
6/19/2022 10845 30-364 17,180.00 2,750.00 6.25 1.00
6/19/2022 10846 30-273 20,650.00 2,750.00 7.51 1.00
6/19/2022 10847 30-360 20,450.00 2,750.00 7.44 1.00
6/19/2022 10848 30-296 19,380.00 2,750.00 7.05 1.00
6/19/2022 10849 30-365 17,050.00 2,750.00 6.20 1.00
6/19/2022 10850 30-273 19,790.00 2,750.00 7.20 1.00
6/19/2022 10851 30-364 18,210.00 2,750.00 6.62 1.00
6/19/2022 10852 30-303 19,180.00 2,750.00 6.97 1.00
6/19/2022 10853 30-300 19,540.00 2,750.00 7.11 1.00
6/19/2022 10854 30-275 18,770.00 2,750.00 6.83 1.00
6/19/2022 10855 30-299 18,570.00 2,750.00 6.75 1.00
6/19/2022 10856 30-294 21,060.00 2,750.00 7.66 1.00
TOTALES 623,310.00 93,500.00 226.69 34.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - -36 30--36


Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/20/2022 10857 30-294 21,060.00 2,750.00 7.66 1.00
6/20/2022 10858 30-295 17,120.00 2,750.00 6.23 1.00
6/20/2022 10859 30-296 11,460.00 2,750.00 4.17 1.00
6/20/2022 10860 30-297 20,080.00 2,750.00 7.30 1.00
6/20/2022 10861 30-298 17,600.00 2,750.00 6.40 1.00
6/20/2022 10862 30-299 16,560.00 2,750.00 6.02 1.00
6/20/2022 10863 30-300 17,050.00 2,750.00 6.20 1.00
6/20/2022 10864 30-294 20,290.00 2,750.00 7.38 1.00
6/20/2022 10865 30-303 18,320.00 2,750.00 6.66 1.00
6/20/2022 10866 30-364 17,500.00 2,750.00 6.36 1.00
6/20/2022 10867 30-296 18,500.00 2,750.00 6.73 1.00
6/20/2022 10868 30-358 19,740.00 2,750.00 7.18 1.00
6/20/2022 10869 30-273 16,510.00 2,750.00 6.00 1.00
6/20/2022 10870 30-294 28,100.00 2,750.00 10.22 1.00
6/20/2022 10871 30-275 15,950.00 2,750.00 5.80 1.00
6/20/2022 10872 30-299 28,990.00 2,750.00 10.54 1.00
6/20/2022 10873 30-365 16,770.00 2,750.00 6.10 1.00
6/20/2022 10874 30-364 13,270.00 2,750.00 4.83 1.00
6/20/2022 10875 30-358 19,148.00 2,750.00 6.96 1.00
6/20/2022 10876 30-303 14,260.00 2,750.00 5.19 1.00
6/20/2022 10877 30-360 14,290.00 2,750.00 5.20 1.00
6/20/2022 10878 30-294 15,220.00 2,750.00 5.53 1.00
6/20/2022 10879 30-300 16,100.00 2,750.00 5.85 1.00
6/20/2022 10880 30-275 17,260.00 2,750.00 6.28 1.00
6/20/2022 10881 30-273 16,300.00 2,750.00 5.93 1.00
6/20/2022 10882 30-364 16,880.00 2,750.00 6.14 1.00
6/20/2022 10883 30-358 19,850.00 2,750.00 7.22 1.00
6/20/2022 10884 30-303 17,690.00 2,750.00 6.43 1.00
6/20/2022 10885 30-294 18,910.00 2,750.00 6.88 1.00
6/20/2022 10886 30-360 19,560.00 2,750.00 7.11 1.00
6/20/2022 10887 30-296 18,690.00 2,750.00 6.80 1.00
6/20/2022 10888 30-297 17,090.00 2,750.00 6.21 1.00
6/20/2022 10889 30-300 16,900.00 2,750.00 6.15 1.00
6/20/2022 10890 30-275 19,380.00 2,750.00 7.05 1.00
6/20/2022 10891 30-365 15,380.00 2,750.00 5.59 1.00
6/20/2022 10892 30-299 15,070.00 2,750.00 5.48 1.00
6/20/2022 10893 30-364 17,760.00 2,750.00 6.46 1.00
6/20/2022 10894 30-294 15,590.00 2,750.00 5.67 1.00
6/20/2022 10895 30-273 19,440.00 2,750.00 7.07 1.00
6/20/2022 10896 30-303 18,290.00 2,750.00 6.65 1.00
6/20/2022 10897 30-243 16,990.00 2,750.00 6.18 1.00
6/20/2022 10898 30-360 16,170.00 2,750.00 5.88 1.00
6/20/2022 10899 30-296 15,840.00 2,750.00 5.76 1.00
6/20/2022 10900 30-365 15,050.00 2,750.00 5.47 1.00
6/20/2022 10901 30-300 19,120.00 2,750.00 6.95 1.00
6/20/2022 10902 30-297 19,070.00 2,750.00 6.93 1.00
6/20/2022 10903 30-275 19,030.00 2,750.00 6.92 1.00
6/20/2022 10904 30-364 15,090.00 2,750.00 5.49 1.00
6/20/2022 10905 30-299 17,370.00 2,750.00 6.32 1.00
6/20/2022 10906 30-303 14,430.00 2,750.00 5.25 1.00
6/20/2022 10907 30-358 17,970.00 2,750.00 6.53 1.00
6/20/2022 10908 30-273 16,620.00 2,750.00 6.04 1.00
6/20/2022 10909 30-294 17,500.00 2,750.00 6.36 1.00
6/20/2022 10910 30-243 14,550.00 2,750.00 5.29 1.00
TOTALES 948,728.00 148,500.00 345.00 54.00

8,766.45

313,838.91
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 294 30-294


Bolon CAMBIO LINEA WAWA 30 - 295 30-295
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 298 30-298
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/21/2022 10911 30365 18,740.00 2,750.00 6.81 1.00
6/21/2022 10912 10912 16,670.00 2,750.00 6.06 1.00
6/21/2022 10913 30294 16,850.00 2,750.00 6.13 1.00
6/21/2022 10914 30358 17,440.00 2,750.00 6.34 1.00
6/21/2022 10915 30360 13,120.00 2,750.00 4.77 1.00
6/21/2022 10916 30275 15,470.00 2,750.00 5.63 1.00
6/21/2022 10917 30296 14,860.00 2,750.00 5.40 1.00
6/21/2022 10918 30273 18,200.00 2,750.00 6.62 1.00
6/21/2022 10919 30122 17,290.00 2,750.00 6.29 1.00
6/21/2022 10920 30106 12,100.00 2,750.00 4.40 1.00
6/21/2022 10921 30817 12,620.00 2,750.00 4.59 1.00
6/21/2022 10922 30144 14,470.00 2,750.00 5.26 1.00
6/21/2022 10923 30297 20,320.00 2,750.00 7.39 1.00
6/21/2022 10924 30299 16,420.00 2,750.00 5.97 1.00
6/21/2022 10925 3096 16,830.00 2,750.00 6.12 1.00
6/21/2022 10926 30133 11,380.00 2,750.00 4.14 1.00
6/21/2022 10927 30125 13,870.00 2,750.00 5.04 1.00
6/21/2022 10928 30164 11,510.00 2,750.00 4.19 1.00
6/21/2022 10929 30365 17,230.00 2,750.00 6.27 1.00
6/21/2022 10930 30294 23,010.00 2,750.00 8.37 1.00
6/21/2022 10931 30243 18,600.00 2,750.00 6.76 1.00
6/21/2022 10932 30274 15,920.00 2,750.00 5.79 1.00
6/21/2022 10933 30303 34,370.00 2,750.00 12.50 1.00
6/21/2022 10934 30358 21,700.00 2,750.00 7.89 1.00
6/21/2022 10935 30275 14,460.00 2,750.00 5.26 1.00
6/21/2022 10936 30296 13,270.00 2,750.00 4.83 1.00
6/21/2022 10937 30360 19,370.00 2,750.00 7.04 1.00
6/21/2022 10938 30445 14,130.00 2,750.00 5.14 1.00
6/21/2022 10939 30273 18,370.00 2,750.00 6.68 1.00
6/21/2022 10940 30275 1,510.00 2,750.00 0.55 1.00
6/21/2022 10941 30365 16,050.00 2,750.00 5.84 1.00
6/21/2022 10942 30294 15,450.00 2,750.00 5.62 1.00
6/21/2022 10943 30164 8,990.00 2,750.00 3.27 1.00
6/21/2022 10944 30299 18,260.00 2,750.00 6.64 1.00
6/21/2022 10945 30243 17,560.00 2,750.00 6.39 1.00
6/21/2022 10946 30274 18,680.00 2,750.00 6.79 1.00
6/21/2022 10947 30144 15,220.00 2,750.00 5.53 1.00
6/21/2022 10948 30296 15,050.00 2,750.00 5.47 1.00
6/21/2022 10949 30303 20,340.00 2,750.00 7.40 1.00
6/21/2022 10950 30358 18,850.00 2,750.00 6.85 1.00
6/21/2022 10951 30365 17,060.00 2,750.00 6.20 1.00
6/21/2022 10952 30243 15,490.00 2,750.00 5.63 1.00
6/21/2022 10953 30294 14,780.00 2,750.00 5.37 1.00
6/21/2022 10954 30303 17,160.00 2,750.00 6.24 1.00
6/21/2022 10955 30164 10,520.00 2,750.00 3.83 1.00
6/21/2022 10956 30133 10,490.00 2,750.00 3.81 1.00
6/21/2022 10957 30360 20,710.00 2,750.00 7.53 1.00
6/21/2022 10958 30358 19,060.00 2,750.00 6.93 1.00
6/21/2022 10959 30243 20,220.00 2,750.00 7.35 1.00
6/21/2022 10960 30274 13,220.00 2,750.00 4.81 1.00
6/21/2022 10961 30365 18,230.00 2,750.00 6.63 1.00
6/21/2022 10962 30296 15,420.00 2,750.00 5.61 1.00
6/21/2022 10963 30303 15,040.00 2,750.00 5.47 1.00
6/21/2022 10964 30144 14,210.00 2,750.00 5.17 1.00
6/21/2022 10965 30297 16,620.00 2,750.00 6.04 1.00
6/21/2022 10966 30273 17,260.00 2,750.00 6.28 1.00
6/21/2022 10967 30360 23,030.00 2,750.00 8.37 1.00
6/21/2022 10968 30358 21,110.00 2,750.00 7.68 1.00
6/21/2022 10969 30275 18,380.00 2,750.00 6.68 1.00
6/21/2022 10970 30365 15,590.00 2,750.00 5.67 1.00
6/21/2022 10971 30299 14,750.00 2,750.00 5.36 1.00
6/21/2022 10972 30133 11,680.00 2,750.00 4.25 1.00
6/21/2022 10973 30300 17,410.00 2,750.00 6.33 1.00
6/21/2022 10974 30303 16,300.00 2,750.00 5.93 1.00
6/21/2022 10975 30296 13,860.00 2,750.00 5.04 1.00
6/21/2022 10976 30243 17,360.00 2,750.00 6.31 1.00
TOTALES 1,079,510.00 181,500.00 392.55 66.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 365 30-365


Bolon CAMBIO LINEA WAWA 10 - 912 10-912
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 122 30-122
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 817 30-817
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 96 30-96
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 125 30-125
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 445 30-445
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/22/2022 10977 30300 17,060.00 2,750.00 6.20 1.00
6/22/2022 10978 30358 20,800.00 2,750.00 7.56 1.00
6/22/2022 10979 30296 15,340.00 2,750.00 5.58 1.00
6/22/2022 10980 30274 20,780.00 2,750.00 7.56 1.00
6/22/2022 10981 30297 17,250.00 2,750.00 6.27 1.00
6/22/2022 10982 30273 21,920.00 2,750.00 7.97 1.00
6/22/2022 10983 30365 20,070.00 2,750.00 7.30 1.00
6/22/2022 10984 30299 19,000.00 2,750.00 6.91 1.00
6/22/2022 10985 30360 20,000.00 2,750.00 7.27 1.00
6/22/2022 10986 30300 18,190.00 2,750.00 6.61 1.00
6/22/2022 10987 30303 14,420.00 2,750.00 5.24 1.00
6/22/2022 10988 30275 16,170.00 2,750.00 5.88 1.00
6/22/2022 10989 30133 13,270.00 2,750.00 4.83 1.00
6/22/2022 10990 30164 8,080.00 2,750.00 2.94 1.00
6/22/2022 10991 30296 15,610.00 2,750.00 5.68 1.00
6/22/2022 10992 30164 17,420.00 2,750.00 6.33 1.00
6/22/2022 10993 30275 19,190.00 2,750.00 6.98 1.00
6/22/2022 10994 30106 26,600.00 2,750.00 9.67 1.00
6/22/2022 10995 30303 18,140.00 2,750.00 6.60 1.00
6/22/2022 10996 30360 18,830.00 2,750.00 6.85 1.00
6/22/2022 10997 30294 16,230.00 2,750.00 5.90 1.00
6/22/2022 10998 30243 19,510.00 2,750.00 7.09 1.00
6/22/2022 10999 10164 10,500.00 2,750.00 3.82 1.00
6/22/2022 11000 30300 17,540.00 2,750.00 6.38 1.00
6/22/2022 11001 30296 17,610.00 2,750.00 6.40 1.00
6/22/2022 11002 30273 17,380.00 2,750.00 6.32 1.00
6/22/2022 11003 30144 16,340.00 2,750.00 5.94 1.00
6/22/2022 11004 30297 22,210.00 2,750.00 8.08 1.00
6/22/2022 11005 30364 21,630.00 2,750.00 7.87 1.00
6/22/2022 11006 30299 16,850.00 2,750.00 6.13 1.00
6/22/2022 11007 30275 18,370.00 2,750.00 6.68 1.00
6/22/2022 11008 30365 17,440.00 2,750.00 6.34 1.00
6/22/2022 11009 30365 17,440.00 2,750.00 6.34 1.00
6/22/2022 11010 30133 13,750.00 2,750.00 5.00 1.00
6/22/2022 11011 30144 17,260.00 2,750.00 6.28 1.00
6/22/2022 11012 30303 15,740.00 2,750.00 5.72 1.00
6/22/2022 11013 30300 14,810.00 2,750.00 5.39 1.00
6/22/2022 11014 30358 22,410.00 2,750.00 8.15 1.00
6/22/2022 11015 30294 17,610.00 2,750.00 6.40 1.00
6/22/2022 11016 30243 19,750.00 2,750.00 7.18 1.00
6/22/2022 11017 30273 19,470.00 2,750.00 7.08 1.00
6/22/2022 11018 30164 12,860.00 2,750.00 4.68 1.00
6/22/2022 11019 30106 17,990.00 2,750.00 6.54 1.00
6/22/2022 11020 30360 14,840.00 2,750.00 5.40 1.00
6/22/2022 11021 30296 15,860.00 2,750.00 5.77 1.00
6/22/2022 11022 30274 15,710.00 2,750.00 5.71 1.00
6/22/2022 11023 30364 21,050.00 2,750.00 7.65 1.00
6/22/2022 11024 30297 17,290.00 2,750.00 6.29 1.00
6/22/2022 11025 30275 18,280.00 2,750.00 6.65 1.00
6/22/2022 11026 30299 16,850.00 2,750.00 6.13 1.00
6/22/2022 11027 30365 16,620.00 2,750.00 6.04 1.00
6/22/2022 11028 30133 10,830.00 2,750.00 3.94 1.00
6/22/2022 11029 30300 18,340.00 2,750.00 6.67 1.00
6/22/2022 11030 30358 20,600.00 2,750.00 7.49 1.00
6/22/2022 11031 30303 20,100.00 2,750.00 7.31 1.00
6/22/2022 11032 30144 18,780.00 2,750.00 6.83 1.00
6/22/2022 11033 30360 17,830.00 2,750.00 6.48 1.00
6/22/2022 11034 30294 15,080.00 2,750.00 5.48 1.00
6/22/2022 11035 30243 15,920.00 2,750.00 5.79 1.00
6/22/2022 11036 30106 19,560.00 2,750.00 7.11 1.00
6/22/2022 11037 30483 25,810.00 2,750.00 9.39 1.00
6/22/2022 11038 30273 16,800.00 2,750.00 6.11 1.00
6/22/2022 11039 30364 16,570.00 2,750.00 6.03 1.00
6/22/2022 11040 30365 17,950.00 2,750.00 6.53 1.00
6/22/2022 11041 30299 18,840.00 2,750.00 6.85 1.00
6/22/2022 11042 30274 16,190.00 2,750.00 5.89 1.00
6/22/2022 11043 30300 18,870.00 2,750.00 6.86 1.00
6/22/2022 11044 30303 20,820.00 2,750.00 7.57 1.00
6/22/2022 11045 30144 14,650.00 2,750.00 5.33 1.00
6/22/2022 11046 30275 18,600.00 2,750.00 6.76 1.00
6/22/2022 11047 30133 12,930.00 2,750.00 4.70 1.00
6/22/2022 11048 30297 19,250.00 2,750.00 7.00 1.00
6/22/2022 11049 30296 18,640.00 2,750.00 6.78 1.00
6/22/2022 11050 30358 20,380.00 2,750.00 7.41 1.00
6/22/2022 11051 30360 23,660.00 2,750.00 8.60 1.00
6/22/2022 11052 30443 16,460.00 2,750.00 5.99 1.00
TOTALES 1,348,800.00 209,000.00 490.48 76.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 300 30-300


Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 10 - 164 10-164
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/23/2022 11053 30275 30,230.00 2,750.00 10.99 1.00
6/23/2022 11054 30164 14,010.00 2,750.00 5.09 1.00
6/23/2022 11055 30133 11,670.00 2,750.00 4.24 1.00
6/23/2022 11056 30364 19,590.00 2,750.00 7.12 1.00
6/23/2022 11057 30300 17,430.00 2,750.00 6.34 1.00
6/23/2022 11058 30294 16,610.00 2,750.00 6.04 1.00
6/23/2022 11059 30360 19,790.00 2,750.00 7.20 1.00
6/23/2022 11060 30274 19,610.00 2,750.00 7.13 1.00
6/23/2022 11061 30299 20,380.00 2,750.00 7.41 1.00
6/23/2022 11062 30275 19,660.00 2,750.00 7.15 1.00
6/23/2022 11063 30144 14,110.00 2,750.00 5.13 1.00
6/23/2022 11064 10106 13,070.00 2,750.00 4.75 1.00
6/23/2022 11065 30807 13,320.00 2,750.00 4.84 1.00
6/23/2022 11066 30366 22,720.00 2,750.00 8.26 1.00
6/23/2022 11067 30164 9,920.00 2,750.00 3.61 1.00
6/23/2022 11068 30296 17,630.00 2,750.00 6.41 1.00
6/23/2022 11069 30303 21,720.00 2,750.00 7.90 1.00
6/23/2022 11070 30133 12,710.00 2,750.00 4.62 1.00
6/23/2022 11071 30493 15,100.00 2,750.00 5.49 1.00
6/23/2022 11072 30153 13,420.00 2,750.00 4.88 1.00
6/23/2022 11073 30294 19,680.00 2,750.00 7.16 1.00
6/23/2022 11074 30360 16,750.00 2,750.00 6.09 1.00
6/23/2022 11075 30274 22,040.00 2,750.00 8.01 1.00
6/23/2022 11076 30365 19,530.00 2,750.00 7.10 1.00
6/23/2022 11077 30299 18,510.00 2,750.00 6.73 1.00
6/23/2022 11078 30364 22,840.00 2,750.00 8.31 1.00
6/23/2022 11079 30297 20,470.00 2,750.00 7.44 1.00
6/23/2022 11080 30300 17,290.00 2,750.00 6.29 1.00
6/23/2022 11081 30106 13,050.00 2,750.00 4.75 1.00
6/23/2022 11082 30358 25,020.00 2,750.00 9.10 1.00
6/23/2022 11083 30296 18,490.00 2,750.00 6.72 1.00
6/23/2022 11084 30493 14,760.00 2,750.00 5.37 1.00
6/23/2022 11085 30366 18,640.00 2,750.00 6.78 1.00
6/23/2022 11086 30133 13,500.00 2,750.00 4.91 1.00
6/23/2022 11087 30153 17,110.00 2,750.00 6.22 1.00
6/23/2022 11088 30273 21,790.00 2,750.00 7.92 1.00
6/23/2022 11089 30365 20,230.00 2,750.00 7.36 1.00
6/23/2022 11090 30243 17,770.00 2,750.00 6.46 1.00
6/23/2022 11091 30275 21,650.00 2,750.00 7.87 1.00
6/23/2022 11092 30144 16,200.00 2,750.00 5.89 1.00
6/23/2022 11093 30294 17,640.00 2,750.00 6.41 1.00
6/23/2022 11094 30106 14,220.00 2,750.00 5.17 1.00
6/23/2022 11095 30303 19,020.00 2,750.00 6.92 1.00
6/23/2022 11096 30164 15,020.00 2,750.00 5.46 1.00
6/23/2022 11097 30358 21,970.00 2,750.00 7.99 1.00
6/23/2022 11098 30364 19,340.00 2,750.00 7.03 1.00
6/23/2022 11099 30297 21,340.00 2,750.00 7.76 1.00
6/23/2022 11100 30299 14,700.00 2,750.00 5.35 1.00
6/23/2022 11101 30133 11,090.00 2,750.00 4.03 1.00
6/23/2022 11102 30493 14,700.00 2,750.00 5.35 1.00
6/23/2022 11103 13153 16,120.00 2,750.00 5.86 1.00
6/23/2022 11104 30296 21,000.00 2,750.00 7.64 1.00
6/23/2022 11105 30243 19,730.00 2,750.00 7.17 1.00
6/23/2022 11106 30365 18,430.00 2,750.00 6.70 1.00
6/23/2022 11107 30273 20,400.00 2,750.00 7.42 1.00
6/23/2022 11108 30275 18,070.00 2,750.00 6.57 1.00
6/23/2022 11109 30300 19,060.00 2,750.00 6.93 1.00
6/23/2022 11110 30294 16,790.00 2,750.00 6.11 1.00
6/23/2022 11111 30360 19,180.00 2,750.00 6.97 1.00
6/23/2022 11112 30144 18,020.00 2,750.00 6.55 1.00
6/23/2022 11113 30106 14,450.00 2,750.00 5.25 1.00
6/23/2022 11114 30358 18,870.00 2,750.00 6.86 1.00
6/23/2022 11115 30364 22,760.00 2,750.00 8.28 1.00
6/23/2022 11116 30164 10,950.00 2,750.00 3.98 1.00
6/23/2022 11117 30133 11,780.00 2,750.00 4.28 1.00
TOTALES 1,152,670.00 178,750.00 419.12 65.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 275 30-275


Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 10 - 106 10-106
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/24/2022 11118 30133 8,300.00 2,750.00 3.02 1.00
6/24/2022 11119 30366 16,620.00 2,750.00 6.04 1.00
6/24/2022 11120 30299 18,210.00 2,750.00 6.62 1.00
6/24/2022 11121 30303 18,130.00 2,750.00 6.59 1.00
6/24/2022 11122 30274 18,420.00 2,750.00 6.70 1.00
6/24/2022 11123 30373 18,890.00 2,750.00 6.87 1.00
6/24/2022 11124 30275 18,530.00 2,750.00 6.74 1.00
6/24/2022 11125 30358 22,860.00 2,750.00 8.31 1.00
6/24/2022 11126 30106 15,250.00 2,750.00 5.55 1.00
6/24/2022 11127 30144 18,010.00 2,750.00 6.55 1.00
6/24/2022 11128 30164 13,310.00 2,750.00 4.84 1.00
6/24/2022 11129 13153 13,010.00 2,750.00 4.73 1.00
6/24/2022 11130 30294 19,530.00 2,750.00 7.10 1.00
6/24/2022 11131 30365 21,350.00 2,750.00 7.76 1.00
6/24/2022 11132 30300 15,990.00 2,750.00 5.81 1.00
6/24/2022 11133 30243 19,780.00 2,750.00 7.19 1.00
6/24/2022 11134 30273 18,900.00 2,750.00 6.87 1.00
6/24/2022 11135 30364 16,600.00 2,750.00 6.04 1.00
6/24/2022 11136 30133 9,380.00 2,750.00 3.41 1.00
6/24/2022 11137 30360 17,880.00 2,750.00 6.50 1.00
6/24/2022 11138 30366 21,760.00 2,750.00 7.91 1.00
6/24/2022 11139 30303 15,180.00 2,750.00 5.52 1.00
6/24/2022 11140 30299 16,180.00 2,750.00 5.88 1.00
6/24/2022 11141 30296 19,240.00 2,750.00 7.00 1.00
6/24/2022 11142 30358 23,250.00 2,750.00 8.45 1.00
6/24/2022 11143 30106 13,330.00 2,750.00 4.85 1.00
6/24/2022 11144 30153 12,450.00 2,750.00 4.53 1.00
6/24/2022 11145 30294 18,100.00 2,750.00 6.58 1.00
6/24/2022 11146 30275 17,120.00 2,750.00 6.23 1.00
6/24/2022 11147 30300 17,630.00 2,750.00 6.41 1.00
6/24/2022 11148 30360 19,210.00 2,750.00 6.99 1.00
6/24/2022 11149 30365 17,600.00 2,750.00 6.40 1.00
6/24/2022 11150 30133 12,480.00 2,750.00 4.54 1.00
6/24/2022 11151 30243 21,650.00 2,750.00 7.87 1.00
6/24/2022 11152 30366 22,370.00 2,750.00 8.13 1.00
6/24/2022 11153 30364 17,180.00 2,750.00 6.25 1.00
6/24/2022 11154 30273 20,790.00 2,750.00 7.56 1.00
6/24/2022 11155 30297 18,110.00 2,750.00 6.59 1.00
6/24/2022 11156 30299 18,310.00 2,750.00 6.66 1.00
6/24/2022 11157 30493 13,140.00 2,750.00 4.78 1.00
6/24/2022 11158 30153 13,220.00 2,750.00 4.81 1.00
6/24/2022 11159 30300 17,980.00 2,750.00 6.54 1.00
6/24/2022 11160 30366 18,900.00 2,750.00 6.87 1.00
6/24/2022 11161 30106 15,030.00 2,750.00 5.47 1.00
6/24/2022 11162 30243 17,390.00 2,750.00 6.32 1.00
6/24/2022 11163 30296 18,760.00 2,750.00 6.82 1.00
6/24/2022 11164 30144 15,210.00 2,750.00 5.53 1.00
6/24/2022 11165 30299 19,240.00 2,750.00 7.00 1.00
6/24/2022 11166 30364 17,720.00 2,750.00 6.44 1.00
6/24/2022 11167 30275 18,590.00 2,750.00 6.76 1.00
6/24/2022 11168 30365 17,690.00 2,750.00 6.43 1.00
6/24/2022 11169 30294 16,520.00 2,750.00 6.01 1.00
6/24/2022 11170 30360 16,760.00 2,750.00 6.09 1.00
6/24/2022 11171 30274 22,010.00 2,750.00 8.00 1.00
6/24/2022 11172 30133 9,690.00 2,750.00 3.52 1.00
6/24/2022 11173 30297 18,800.00 2,750.00 6.84 1.00
6/24/2022 11174 30358 20,830.00 2,750.00 7.57 1.00
6/24/2022 11175 30493 12,320.00 2,750.00 4.48 1.00
6/24/2022 11176 30153 14,860.00 2,750.00 5.40 1.00
6/24/2022 11177 30106 13,660.00 2,750.00 4.97 1.00
6/24/2022 11178 30273 17,820.00 2,750.00 6.48 1.00
6/24/2022 11179 30300 17,170.00 2,750.00 6.24 1.00
6/24/2022 11180 30366 17,880.00 2,750.00 6.50 1.00
6/24/2022 11181 30133 10,920.00 2,750.00 3.97 1.00
6/24/2022 11182 30274 15,870.00 2,750.00 5.77 1.00
6/24/2022 11183 30164 18,850.00 2,750.00 6.85 1.00
6/24/2022 11184 30358 15,750.00 2,750.00 5.73 1.00
6/24/2022 11185 30364 17,910.00 2,750.00 6.51 1.00
6/24/2022 11186 30243 17,390.00 2,750.00 6.32 1.00
6/24/2022 11187 30360 17,630.00 2,750.00 6.41 1.00
6/24/2022 11188 30294 16,500.00 2,750.00 6.00 1.00
6/24/2022 11189 30297 15,270.00 2,750.00 5.55 1.00
6/24/2022 11190 30153 12,020.00 2,750.00 4.37 1.00
6/24/2022 11191 30493 14,380.00 2,750.00 5.23 1.00
TOTALES 1,254,570.00 203,500.00 456.17 74.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 133 30-133


Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 13 - 153 13-153
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/25/2022 11192 30300 18,320.00 2,750.00 6.66 1.00
6/25/2022 11193 30366 16,880.00 2,750.00 6.14 1.00
6/25/2022 11194 30445 15,540.00 2,750.00 5.65 1.00
6/25/2022 11195 30360 19,590.00 2,750.00 7.12 1.00
6/25/2022 11196 30358 17,460.00 2,750.00 6.35 1.00
6/25/2022 11197 30483 12,160.00 2,750.00 4.42 1.00
6/25/2022 11198 30807 13,110.00 2,750.00 4.77 1.00
6/25/2022 11199 30297 22,300.00 2,750.00 8.11 1.00
6/25/2022 11200 30125 15,870.00 2,750.00 5.77 1.00
6/25/2022 11201 30275 20,080.00 2,750.00 7.30 1.00
6/25/2022 11202 30274 20,620.00 2,750.00 7.50 1.00
6/25/2022 11203 30443 18,020.00 2,750.00 6.55 1.00
6/25/2022 11204 30810 17,280.00 2,750.00 6.28 1.00
6/25/2022 11205 30373 17,600.00 2,750.00 6.40 1.00
6/25/2022 11206 30817 14,610.00 2,750.00 5.31 1.00
6/25/2022 11207 30273 16,820.00 2,750.00 6.12 1.00
6/25/2022 11208 30296 17,950.00 2,750.00 6.53 1.00
6/25/2022 11209 30133 10,720.00 2,750.00 3.90 1.00
6/25/2022 11210 30493 13,310.00 2,750.00 4.84 1.00
6/25/2022 11211 30243 19,080.00 2,750.00 6.94 1.00
6/25/2022 11212 30335 13,470.00 2,750.00 4.90 1.00
6/25/2022 11213 30300 20,880.00 2,750.00 7.59 1.00
6/25/2022 11214 30164 15,020.00 2,750.00 5.46 1.00
6/25/2022 11215 30448 16,870.00 2,750.00 6.13 1.00
6/25/2022 11216 30445 17,560.00 2,750.00 6.39 1.00
6/25/2022 11217 30294 15,550.00 2,750.00 5.65 1.00
6/25/2022 11218 30360 17,330.00 2,750.00 6.30 1.00
6/25/2022 11219 30358 20,670.00 2,750.00 7.52 1.00
6/25/2022 11220 30366 19,470.00 2,750.00 7.08 1.00
6/25/2022 11221 30810 16,700.00 2,750.00 6.07 1.00
6/25/2022 11222 30483 23,630.00 2,750.00 8.59 1.00
6/25/2022 11223 30807 18,620.00 2,750.00 6.77 1.00
6/25/2022 11224 30373 17,290.00 2,750.00 6.29 1.00
6/25/2022 11225 30817 13,780.00 2,750.00 5.01 1.00
6/25/2022 11226 30443 23,150.00 2,750.00 8.42 1.00
6/25/2022 11227 30144 15,310.00 2,750.00 5.57 1.00
6/25/2022 11228 30125 20,060.00 2,750.00 7.29 1.00
6/25/2022 11229 30297 18,030.00 2,750.00 6.56 1.00
6/25/2022 11230 30274 21,270.00 2,750.00 7.73 1.00
6/25/2022 11231 30448 15,080.00 2,750.00 5.48 1.00
6/25/2022 11232 30493 14,090.00 2,750.00 5.12 1.00
6/25/2022 11233 30364 22,050.00 2,750.00 8.02 1.00
6/25/2022 11234 30360 26,960.00 2,750.00 9.80 1.00
6/25/2022 11235 30164 13,560.00 2,750.00 4.93 1.00
6/25/2022 11236 30335 13,860.00 2,750.00 5.04 1.00
6/25/2022 11237 30296 16,230.00 2,750.00 5.90 1.00
6/25/2022 11238 30347 14,450.00 2,750.00 5.25 1.00
6/25/2022 11239 30300 18,780.00 2,750.00 6.83 1.00
6/25/2022 11240 30243 10,590.00 2,750.00 3.85 1.00
6/25/2022 11241 30294 17,450.00 2,750.00 6.35 1.00
6/25/2022 11242 30273 20,040.00 2,750.00 7.29 1.00
6/25/2022 11244 30144 16,370.00 2,750.00 5.95 1.00
6/25/2022 11245 30493 12,900.00 2,750.00 4.69 1.00
6/25/2022 11246 30164 17,760.00 2,750.00 6.46 1.00
6/25/2022 11247 30335 10,410.00 2,750.00 3.79 1.00
6/25/2022 11248 30274 13,360.00 2,750.00 4.86 1.00
6/25/2022 11249 30366 19,100.00 2,750.00 6.95 1.00
6/25/2022 11250 30153 10,970.00 2,750.00 3.99 1.00
6/25/2022 11251 30275 20,790.00 2,750.00 7.56 1.00
6/25/2022 11252 30133 10,430.00 2,750.00 3.79 1.00
6/25/2022 11253 30297 20,420.00 2,750.00 7.43 1.00
6/25/2022 11254 30364 20,450.00 2,750.00 7.44 1.00
6/25/2022 11255 30365 17,230.00 2,750.00 6.27 1.00
6/25/2022 11256 30296 16,900.00 2,750.00 6.15 1.00
6/25/2022 11257 30144 10,280.00 2,750.00 3.74 1.00
6/25/2022 11258 30493 11,380.00 2,750.00 4.14 1.00
6/25/2022 11259 30153 10,000.00 2,750.00 3.64 1.00
6/25/2022 11260 30300 20,880.00 2,750.00 7.59 1.00
6/25/2022 11261 30360 20,240.00 2,750.00 7.36 1.00
6/25/2022 11262 30296 19,350.00 2,750.00 7.04 1.00
6/25/2022 11263 30273 16,390.00 2,750.00 5.96 1.00
6/25/2022 11264 30164 11,310.00 2,750.00 4.11 1.00
6/25/2022 11265 30294 19,190.00 2,750.00 6.98 1.00
6/25/2022 11266 30133 10,730.00 2,750.00 3.90 1.00
6/25/2022 11267 30474 12,190.00 2,750.00 4.43 1.00
6/25/2022 11268 30243 23,000.00 2,750.00 8.36 1.00
6/25/2022 11269 30810 13,620.00 2,750.00 4.95 1.00
6/25/2022 11270 30125 14,950.00 2,750.00 5.44 1.00
6/25/2022 11271 30358 20,270.00 2,750.00 7.37 1.00
6/25/2022 11272 30297 19,040.00 2,750.00 6.92 1.00
6/25/2022 11273 30366 18,380.00 2,750.00 6.68 1.00
6/25/2022 11274 30275 15,630.00 2,750.00 5.68 1.00
6/25/2022 11275 30364 19,390.00 2,750.00 7.05 1.00
6/25/2022 11276 30365 19,350.00 2,750.00 7.04 1.00
TOTALES 1,417,780.00 231,000.00 515.55 84.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 300 30-300


Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 445 30-445
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 483 30-483
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 125 30-125
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 443 30-443
Bolon CAMBIO LINEA WAWA 30 - 810 30-810
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 817 30-817
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 335 30-335
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 445 30-445
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 810 30-810
Bolon CAMBIO LINEA WAWA 30 - 483 30-483
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 817 30-817
Bolon CAMBIO LINEA WAWA 30 - 443 30-443
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 125 30-125
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/26/2022 11277 30364 18,140.00 2,750.00 6.60 1.00
6/26/2022 11278 30365 18,330.00 2,750.00 6.67 1.00
6/26/2022 11279 30360 20,560.00 2,750.00 7.48 1.00
6/26/2022 11280 30153 11,520.00 2,750.00 4.19 1.00
6/26/2022 11281 30296 19,070.00 2,750.00 6.93 1.00
6/26/2022 11282 30275 18,610.00 2,750.00 6.77 1.00
6/26/2022 11283 30144 10,480.00 2,750.00 3.81 1.00
6/26/2022 11284 30294 19,370.00 2,750.00 7.04 1.00
6/26/2022 11285 30493 12,600.00 2,750.00 4.58 1.00
6/26/2022 11286 30274 12,230.00 2,750.00 4.45 1.00
6/26/2022 11287 30273 16,130.00 2,750.00 5.87 1.00
6/26/2022 11288 30297 17,410.00 2,750.00 6.33 1.00
6/26/2022 11289 30335 10,790.00 2,750.00 3.92 1.00
6/26/2022 11290 30133 9,090.00 2,750.00 3.31 1.00
6/26/2022 11291 30366 13,950.00 2,750.00 5.07 1.00
6/26/2022 11292 30386 11,320.00 2,750.00 4.12 1.00
6/26/2022 11293 30106 8,600.00 2,750.00 3.13 1.00
6/26/2022 11294 30243 18,760.00 2,750.00 6.82 1.00
6/26/2022 11295 30364 9,580.00 2,750.00 3.48 1.00
6/26/2022 11296 30153 10,780.00 2,750.00 3.92 1.00
6/26/2022 11297 30360 18,440.00 2,750.00 6.71 1.00
6/26/2022 11298 30296 18,250.00 2,750.00 6.64 1.00
6/26/2022 11299 30275 19,900.00 2,750.00 7.24 1.00
6/26/2022 11300 30300 12,860.00 2,750.00 4.68 1.00
6/26/2022 11301 30365 15,640.00 2,750.00 5.69 1.00
6/26/2022 11302 30335 14,220.00 2,750.00 5.17 1.00
6/26/2022 11303 30144 13,460.00 2,750.00 4.89 1.00
6/26/2022 11304 30493 11,490.00 2,750.00 4.18 1.00
6/26/2022 11305 30294 20,310.00 2,750.00 7.39 1.00
6/26/2022 11306 30358 21,580.00 2,750.00 7.85 1.00
6/26/2022 11307 30297 19,420.00 2,750.00 7.06 1.00
6/26/2022 11308 30273 21,460.00 2,750.00 7.80 1.00
6/26/2022 11309 30133 8,180.00 2,750.00 2.97 1.00
6/26/2022 11310 30106 11,240.00 2,750.00 4.09 1.00
6/26/2022 11311 30366 18,490.00 2,750.00 6.72 1.00
6/26/2022 11312 30364 15,160.00 2,750.00 5.51 1.00
6/26/2022 11313 30296 18,340.00 2,750.00 6.67 1.00
6/26/2022 11314 30360 15,190.00 2,750.00 5.52 1.00
6/26/2022 11315 30274 17,240.00 2,750.00 6.27 1.00
6/26/2022 11316 30299 16,170.00 2,750.00 5.88 1.00
6/26/2022 11317 30243 17,110.00 2,750.00 6.22 1.00
6/26/2022 11318 30275 21,230.00 2,750.00 7.72 1.00
6/26/2022 11319 30300 16,250.00 2,750.00 5.91 1.00
6/26/2022 11320 30365 16,200.00 2,750.00 5.89 1.00
6/26/2022 11321 30493 10,770.00 2,750.00 3.92 1.00
6/26/2022 11322 30153 13,260.00 2,750.00 4.82 1.00
6/26/2022 11323 30335 10,690.00 2,750.00 3.89 1.00
6/26/2022 11324 30144 11,450.00 2,750.00 4.16 1.00
6/26/2022 11325 30562 14,420.00 2,750.00 5.24 1.00
6/26/2022 11326 30133 7,490.00 2,750.00 2.72 1.00
6/26/2022 11327 30366 18,280.00 2,750.00 6.65 1.00
6/26/2022 11328 30364 14,660.00 2,750.00 5.33 1.00
6/26/2022 11329 30294 17,580.00 2,750.00 6.39 1.00
6/26/2022 11330 30273 14,520.00 2,750.00 5.28 1.00
6/26/2022 11331 30358 18,210.00 2,750.00 6.62 1.00
6/26/2022 11332 30106 11,110.00 2,750.00 4.04 1.00
6/26/2022 11333 30300 18,450.00 2,750.00 6.71 1.00
6/26/2022 11334 30493 17,190.00 2,750.00 6.25 1.00
6/26/2022 11335 30365 17,320.00 2,750.00 6.30 1.00
6/26/2022 11336 30153 12,290.00 2,750.00 4.47 1.00
6/26/2022 11337 30335 8,560.00 2,750.00 3.11 1.00
6/26/2022 11338 30360 19,940.00 2,750.00 7.25 1.00
6/26/2022 11339 30275 17,480.00 2,750.00 6.36 1.00
6/26/2022 11340 30299 14,860.00 2,750.00 5.40 1.00
6/26/2022 11341 30144 15,960.00 2,750.00 5.80 1.00
6/26/2022 11342 30296 18,260.00 2,750.00 6.64 1.00
TOTALES 1,007,900.00 181,500.00 366.51 66.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 364 30-364


Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 335 30-335
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 386 30-386
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 335 30-335
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 335 30-335
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 335 30-335
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/27/2022 11343 30-366 19,550.00 2,750.00 7.11 1.00
6/27/2022 11344 30-133 10,750.00 2,750.00 3.91 1.00
6/27/2022 11345 30-364 17,180.00 2,750.00 6.25 1.00
6/27/2022 11346 30-358 21,480.00 2,750.00 7.81 1.00
6/27/2022 11347 30-360 18,690.00 2,750.00 6.80 1.00
6/27/2022 11348 30-294 14,370.00 2,750.00 5.23 1.00
6/27/2022 11349 30-144 13,010.00 2,750.00 4.73 1.00
6/27/2022 11350 30-153 11,090.00 2,750.00 4.03 1.00
6/27/2022 11351 30-386 11,850.00 2,750.00 4.31 1.00
6/27/2022 11352 30-300 13,870.00 2,750.00 5.04 1.00
6/27/2022 11353 30-297 21,120.00 2,750.00 7.68 1.00
6/27/2022 11354 30-275 15,520.00 2,750.00 5.64 1.00
6/27/2022 11355 30-366 21,100.00 2,750.00 7.67 1.00
6/27/2022 11356 30-493 13,420.00 2,750.00 4.88 1.00
6/27/2022 11357 30-273 15,630.00 2,750.00 5.68 1.00
6/27/2022 11358 30-299 15,130.00 2,750.00 5.50 1.00
6/27/2022 11359 30-296 15,350.00 2,750.00 5.58 1.00
6/27/2022 11360 30-364 17,300.00 2,750.00 6.29 1.00
6/27/2022 11361 30-106 12,640.00 2,750.00 4.60 1.00
6/27/2022 11362 30-133 7,930.00 2,750.00 2.88 1.00
6/27/2022 11363 30-443 16,860.00 2,750.00 6.13 1.00
6/27/2022 11364 30-365 16,720.00 2,750.00 6.08 1.00
6/27/2022 11365 30-350 20,350.00 2,750.00 7.40 1.00
6/27/2022 11366 30-807 12,400.00 2,750.00 4.51 1.00
6/27/2022 11367 30-445 14,170.00 2,750.00 5.15 1.00
6/27/2022 11368 30-483 10,280.00 2,750.00 3.74 1.00
6/27/2022 11369 30-360 18,070.00 2,750.00 6.57 1.00
6/27/2022 11370 30-386 11,560.00 2,750.00 4.20 1.00
6/27/2022 11371 30-153 10,970.00 2,750.00 3.99 1.00
6/27/2022 11372 30-294 16,700.00 2,750.00 6.07 1.00
6/27/2022 11373 30-297 17,890.00 2,750.00 6.51 1.00
6/27/2022 11374 30-366 19,910.00 2,750.00 7.24 1.00
6/27/2022 11375 30-144 7,890.00 2,750.00 2.87 1.00
6/27/2022 11376 30-347 13,140.00 2,750.00 4.78 1.00
6/27/2022 11377 30-364 18,680.00 2,750.00 6.79 1.00
6/27/2022 11378 30-299 20,240.00 2,750.00 7.36 1.00
6/27/2022 11379 30-300 20,980.00 2,750.00 7.63 1.00
6/27/2022 11380 30-493 12,320.00 2,750.00 4.48 1.00
6/27/2022 11381 30-810 14,920.00 2,750.00 5.43 1.00
6/27/2022 11382 30-817 13,170.00 2,750.00 4.79 1.00
6/27/2022 11383 30-133 14,080.00 2,750.00 5.12 1.00
6/27/2022 11384 30-125 12,490.00 2,750.00 4.54 1.00
6/27/2022 11385 30-275 14,050.00 2,750.00 5.11 1.00
6/27/2022 11386 30-365 16,950.00 2,750.00 6.16 1.00
6/27/2022 11387 30-273 19,140.00 2,750.00 6.96 1.00
6/27/2022 11388 30-106 12,860.00 2,750.00 4.68 1.00
6/27/2022 11389 30-184 20,770.00 2,750.00 7.55 1.00
6/27/2022 11390 30-373 18,390.00 2,750.00 6.69 1.00
6/27/2022 11391 30-158 21,260.00 2,750.00 7.73 1.00
6/27/2022 11392 30-296 28,410.00 2,750.00 10.33 1.00
6/27/2022 11393 30-297 21,700.00 2,750.00 7.89 1.00
6/27/2022 11394 30-493 11,580.00 2,750.00 4.21 1.00
6/27/2022 11395 30-364 14,150.00 2,750.00 5.15 1.00
6/27/2022 11396 30-133 9,790.00 2,750.00 3.56 1.00
6/27/2022 11397 30-153 12,150.00 2,750.00 4.42 1.00
6/27/2022 11398 30-106 12,070.00 2,750.00 4.39 1.00
6/27/2022 11399 30-144 13,430.00 2,750.00 4.88 1.00
6/27/2022 11400 30-443 16,140.00 2,750.00 5.87 1.00
6/27/2022 11401 30-300 16,780.00 2,750.00 6.10 1.00
6/27/2022 11402 30-275 22,750.00 2,750.00 8.27 1.00
6/27/2022 11403 30-294 14,810.00 2,750.00 5.39 1.00
6/27/2022 11404 30-562 16,370.00 2,750.00 5.95 1.00
6/27/2022 11405 30-184 13,150.00 2,750.00 4.78 1.00
6/27/2022 11406 30-365 14,130.00 2,750.00 5.14 1.00
6/27/2022 11407 30-273 23,420.00 2,750.00 8.52 1.00
6/27/2022 11408 30-493 11,890.00 2,750.00 4.32 1.00
6/27/2022 11409 30-360 14,920.00 2,750.00 5.43 1.00
6/27/2022 11410 30-335 11,850.00 2,750.00 4.31 1.00
6/27/2022 11411 30-153 9,500.00 2,750.00 3.45 1.00
6/27/2022 11412 30-133 10,160.00 2,750.00 3.69 1.00
6/27/2022 11413 30-297 20,000.00 2,750.00 7.27 1.00
6/27/2022 11414 30-106 10,280.00 2,750.00 3.74 1.00
6/27/2022 11415 30-364 18,840.00 2,750.00 6.85 1.00
6/27/2022 11416 30-243 19,190.00 2,750.00 6.98 1.00
6/27/2022 11417 30-299 16,310.00 2,750.00 5.93 1.00
6/27/2022 11418 30-300 13,260.00 2,750.00 4.82 1.00
6/27/2022 11419 30-144 10,450.00 2,750.00 3.80 1.00
6/27/2022 11420 30-358 22,160.00 2,750.00 8.06 1.00
6/27/2022 11421 30-275 18,560.00 2,750.00 6.75 1.00
6/27/2022 11422 30-335 10,640.00 2,750.00 3.87 1.00
6/27/2022 11423 30-300 14,230.00 2,750.00 5.17 1.00
6/27/2022 11424 30-133 9,800.00 2,750.00 3.56 1.00
6/27/2022 11425 30-299 20,020.00 2,750.00 7.28 1.00
6/27/2022 11426 30-106 12,570.00 2,750.00 4.57 1.00
6/27/2022 11427 30-294 14,450.00 2,750.00 5.25 1.00
6/27/2022 11428 30-364 17,380.00 2,750.00 6.32 1.00
6/27/2022 11429 30-364 17,380.00 2,750.00 6.32 1.00
6/27/2022 11430 30-275 14,520.00 2,750.00 5.28 1.00
6/27/2022 11431 30-300 15,990.00 2,750.00 5.81 1.00
6/27/2022 11432 30-296 17,840.00 2,750.00 6.49 1.00
6/27/2022 11433 30-366 14,600.00 2,750.00 5.31 1.00
6/27/2022 11434 30-133 10,460.00 2,750.00 3.80 1.00
6/27/2022 11435 30-243 14,770.00 2,750.00 5.37 1.00
6/27/2022 11436 30-299 16,890.00 2,750.00 6.14 1.00
TOTALES 1,453,930.00 258,500.00 528.67 94.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - -36 30--36


Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -14 30--14
Bolon CAMBIO LINEA WAWA 30 - -15 30--15
Bolon CAMBIO LINEA WAWA 30 - -38 30--38
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -49 30--49
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -80 30--80
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -48 30--48
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -38 30--38
Bolon CAMBIO LINEA WAWA 30 - -15 30--15
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -14 30--14
Bolon CAMBIO LINEA WAWA 30 - -34 30--34
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -49 30--49
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -12 30--12
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -37 30--37
Bolon CAMBIO LINEA WAWA 30 - -15 30--15
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -49 30--49
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -15 30--15
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -14 30--14
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -56 30--56
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -49 30--49
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -33 30--33
Bolon CAMBIO LINEA WAWA 30 - -15 30--15
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -14 30--14
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -33 30--33
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/28/2022 11437 30-366 16,040.00 2,750.00 5.83 1.00
6/28/2022 11438 30-299 20,200.00 2,750.00 7.35 1.00
6/28/2022 11439 30-360 19,190.00 2,750.00 6.98 1.00
6/28/2022 11440 30-358 20,410.00 2,750.00 7.42 1.00
6/28/2022 11441 30-300 14,770.00 2,750.00 5.37 1.00
6/28/2022 11442 30-364 20,150.00 2,750.00 7.33 1.00
6/28/2022 11443 30-294 13,810.00 2,750.00 5.02 1.00
6/28/2022 11444 30-297 18,640.00 2,750.00 6.78 1.00
6/28/2022 11445 30-273 15,340.00 2,750.00 5.58 1.00
6/28/2022 11446 30-296 17,950.00 2,750.00 6.53 1.00
6/28/2022 11447 30-275 19,320.00 2,750.00 7.03 1.00
6/28/2022 11448 30-366 17,520.00 2,750.00 6.37 1.00
6/28/2022 11449 30-243 19,950.00 2,750.00 7.25 1.00
6/28/2022 11450 30-299 14,790.00 2,750.00 5.38 1.00
6/28/2022 11451 30-300 16,730.00 2,750.00 6.08 1.00
6/28/2022 11452 30-133 9,500.00 2,750.00 3.45 1.00
6/28/2022 11453 30-364 19,420.00 2,750.00 7.06 1.00
6/28/2022 11454 30-184 8,980.00 2,750.00 3.27 1.00
6/28/2022 11455 30-358 22,570.00 2,750.00 8.21 1.00
6/28/2022 11456 30-297 19,310.00 2,750.00 7.02 1.00
6/28/2022 11457 30-294 17,290.00 2,750.00 6.29 1.00
6/28/2022 11458 30-366 17,460.00 2,750.00 6.35 1.00
6/28/2022 11459 30-243 18,000.00 2,750.00 6.55 1.00
6/28/2022 11460 30-275 17,710.00 2,750.00 6.44 1.00
6/28/2022 11461 30-273 17,670.00 2,750.00 6.43 1.00
6/28/2022 11462 30-133 6,780.00 2,750.00 2.47 1.00
6/28/2022 11463 30-300 18,840.00 2,750.00 6.85 1.00
6/28/2022 11464 30-562 16,480.00 2,750.00 5.99 1.00
6/28/2022 11465 30-299 17,680.00 2,750.00 6.43 1.00
6/28/2022 11466 30-275 18,930.00 2,750.00 6.88 1.00
6/28/2022 11467 30-243 20,360.00 2,750.00 7.40 1.00
6/28/2022 11468 30-364 18,840.00 2,750.00 6.85 1.00
6/28/2022 11469 30-273 19,290.00 2,750.00 7.01 1.00
6/28/2022 11470 30-294 15,600.00 2,750.00 5.67 1.00
6/28/2022 11471 30-133 10,900.00 2,750.00 3.96 1.00
6/28/2022 11472 30-184 10,210.00 2,750.00 3.71 1.00
6/28/2022 11473 30-300 17,060.00 2,750.00 6.20 1.00
6/28/2022 11474 30-365 16,620.00 2,750.00 6.04 1.00
6/28/2022 11475 30-275 18,290.00 2,750.00 6.65 1.00
6/28/2022 11476 30-299 17,990.00 2,750.00 6.54 1.00
6/28/2022 11477 30-562 14,360.00 2,750.00 5.22 1.00
6/28/2022 11478 30-273 19,990.00 2,750.00 7.27 1.00
6/28/2022 11479 30-164 12,090.00 2,750.00 4.40 1.00
6/28/2022 11480 30-296 16,307.00 2,750.00 5.93 1.00
6/28/2022 11481 30-133 11,590.00 2,750.00 4.21 1.00
6/28/2022 11482 30-365 16,860.00 2,750.00 6.13 1.00
6/28/2022 11483 30-300 17,610.00 2,750.00 6.40 1.00
6/28/2022 11484 30-275 16,080.00 2,750.00 5.85 1.00
6/28/2022 11485 30-243 21,400.00 2,750.00 7.78 1.00
6/28/2022 11486 30-273 19,570.00 2,750.00 7.12 1.00
6/28/2022 11487 30-562 14,730.00 2,750.00 5.36 1.00
6/28/2022 11488 30-360 22,070.00 2,750.00 8.03 1.00
6/28/2022 11489 30-373 16,970.00 2,750.00 6.17 1.00
6/28/2022 11490 30-294 14,220.00 2,750.00 5.17 1.00
6/28/2022 11491 30-296 17,720.00 2,750.00 6.44 1.00
TOTALES 928,157.00 151,250.00 337.50 55.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - -36 30--36


Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -56 30--56
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -56 30--56
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -16 30--16
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -56 30--56
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -37 30--37
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/29/2022 11492 30-133 10,660.00 2,750.00 3.88 1.00
6/29/2022 11493 30-243 19,500.00 2,750.00 7.09 1.00
6/29/2022 11494 30-347 13,390.00 2,750.00 4.87 1.00
6/29/2022 11495 30-300 17,670.00 2,750.00 6.43 1.00
6/29/2022 11496 30-275 18,660.00 2,750.00 6.79 1.00
6/29/2022 11497 30-366 19,620.00 2,750.00 7.13 1.00
6/29/2022 11498 30-106 16,080.00 2,750.00 5.85 1.00
6/29/2022 11499 30-358 22,100.00 2,750.00 8.04 1.00
6/29/2022 11500 30-365 16,850.00 2,750.00 6.13 1.00
6/29/2022 11501 30-133 19,450.00 2,750.00 7.07 1.00
6/29/2022 11502 30-273 15,310.00 2,750.00 5.57 1.00
6/29/2022 11503 30-360 22,260.00 2,750.00 8.09 1.00
6/29/2022 11504 30-299 16,600.00 2,750.00 6.04 1.00
6/29/2022 11505 30-184 10,610.00 2,750.00 3.86 1.00
6/29/2022 11506 30-297 19,620.00 2,750.00 7.13 1.00
6/29/2022 11507 30-364 18,810.00 2,750.00 6.84 1.00
6/29/2022 11508 30-296 18,120.00 2,750.00 6.59 1.00
6/29/2022 11509 30-347 11,110.00 2,750.00 4.04 1.00
6/29/2022 11510 30-366 16,600.00 2,750.00 6.04 1.00
6/29/2022 11511 30-300 17,040.00 2,750.00 6.20 1.00
6/29/2022 11512 30-106 11,360.00 2,750.00 4.13 1.00
6/29/2022 11513 30-358 17,940.00 2,750.00 6.52 1.00
6/29/2022 11514 30-243 13,760.00 2,750.00 5.00 1.00
6/29/2022 11515 30-294 14,470.00 2,750.00 5.26 1.00
6/29/2022 11516 30-133 10,360.00 2,750.00 3.77 1.00
6/29/2022 11517 30-275 20,420.00 2,750.00 7.43 1.00
6/29/2022 11518 30-365 17,050.00 2,750.00 6.20 1.00
6/29/2022 11519 30-273 18,160.00 2,750.00 6.60 1.00
6/29/2022 11520 30-125 12,220.00 2,750.00 4.44 1.00
6/29/2022 11521 30-299 17,950.00 2,750.00 6.53 1.00
6/29/2022 11522 30-164 10,770.00 2,750.00 3.92 1.00
6/29/2022 11523 30-364 16,370.00 2,750.00 5.95 1.00
6/29/2022 11524 30-366 14,570.00 2,750.00 5.30 1.00
6/29/2022 11525 30-297 15,420.00 2,750.00 5.61 1.00
6/29/2022 11526 30-358 15,890.00 2,750.00 5.78 1.00
6/29/2022 11527 30-360 15,970.00 2,750.00 5.81 1.00
6/29/2022 11528 30-243 14,490.00 2,750.00 5.27 1.00
6/29/2022 11529 30-106 9,550.00 2,750.00 3.47 1.00
6/29/2022 11530 30-300 15,210.00 2,750.00 5.53 1.00
6/29/2022 11531 30-365 14,960.00 2,750.00 5.44 1.00
6/29/2022 11532 30-184 9,960.00 2,750.00 3.62 1.00
6/29/2022 11533 30-275 15,730.00 2,750.00 5.72 1.00
6/29/2022 11534 30-299 16,050.00 2,750.00 5.84 1.00
6/29/2022 11535 30-144 12,190.00 2,750.00 4.43 1.00
6/29/2022 11536 30-366 14,560.00 2,750.00 5.29 1.00
6/29/2022 11537 30-296 15,020.00 2,750.00 5.46 1.00
6/29/2022 11538 30-274 12,640.00 2,750.00 4.60 1.00
6/29/2022 11539 30-364 12,640.00 2,750.00 4.60 1.00
6/29/2022 11540 30-297 16,720.00 2,750.00 6.08 1.00
6/29/2022 11541 30-360 11,710.00 2,750.00 4.26 1.00
6/29/2022 11542 30-243 13,560.00 2,750.00 4.93 1.00
6/29/2022 11543 30-300 3,690.00 2,750.00 1.34 1.00
6/29/2022 11544 30-106 12,140.00 2,750.00 4.41 1.00
6/29/2022 11545 30-184 11,010.00 2,750.00 4.00 1.00
6/29/2022 11546 30-366 17,270.00 2,750.00 6.28 1.00
6/29/2022 11547 30-273 17,970.00 2,750.00 6.53 1.00
6/29/2022 11548 30-358 18,410.00 2,750.00 6.69 1.00
6/29/2022 11549 30-364 15,790.00 2,750.00 5.74 1.00
6/29/2022 11550 30-299 17,160.00 2,750.00 6.24 1.00
6/29/2022 11551 30-297 15,550.00 2,750.00 5.65 1.00
6/29/2022 11552 30-275 24,090.00 2,750.00 8.76 1.00
6/29/2022 11553 30-360 19,130.00 2,750.00 6.96 1.00
6/29/2022 11554 30-294 17,080.00 2,750.00 6.21 1.00
6/29/2022 11555 30-296 16,990.00 2,750.00 6.18 1.00
6/29/2022 11556 30-365 14,300.00 2,750.00 5.20 1.00
6/29/2022 11557 30-133 7,810.00 2,750.00 2.84 1.00
6/29/2022 11558 30-243 19,140.00 2,750.00 6.96 1.00
6/29/2022 11559 30-300 18,540.00 2,750.00 6.74 1.00
6/29/2022 11560 30-273 18,630.00 2,750.00 6.77 1.00
6/29/2022 11561 30-144 15,690.00 2,750.00 5.71 1.00
6/29/2022 11562 30-184 11,450.00 2,750.00 4.16 1.00
6/29/2022 11563 30-366 18,050.00 2,750.00 6.56 1.00
6/29/2022 11564 30-562 14,070.00 2,750.00 5.12 1.00
6/29/2022 11565 30-275 19,420.00 2,750.00 7.06 1.00
6/29/2022 11566 30-350 20,150.00 2,750.00 7.33 1.00
6/29/2022 11567 30-299 20,020.00 2,750.00 7.28 1.00
6/29/2022 11568 30-294 13,730.00 2,750.00 4.99 1.00
TOTALES 1,205,010.00 211,750.00 438.18 77.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - -13 30--13


Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -34 30--34
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -34 30--34
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -12 30--12
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -16 30--16
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -14 30--14
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -10 30--10
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -14 30--14
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -56 30--56
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
6/30/2022 11569 30-366 17,460.00 2,750.00 6.35 1.00
6/30/2022 11570 30-133 9,540.00 2,750.00 3.47 1.00
6/30/2022 11571 30-243 12,680.00 2,750.00 4.61 1.00
6/30/2022 11572 30-243 12,680.00 2,750.00 4.61 1.00
6/30/2022 11573 30-358 23,200.00 2,750.00 8.44 1.00
6/30/2022 11574 30-294 16,110.00 2,750.00 5.86 1.00
6/30/2022 11575 30-273 17,600.00 2,750.00 6.40 1.00
6/30/2022 11576 30-360 17,080.00 2,750.00 6.21 1.00
6/30/2022 11577 30-299 15,710.00 2,750.00 5.71 1.00
6/30/2022 11578 30-297 18,690.00 2,750.00 6.80 1.00
6/30/2022 11579 30-275 21,400.00 2,750.00 7.78 1.00
6/30/2022 11580 30-133 10,630.00 2,750.00 3.87 1.00
6/30/2022 11581 30-300 16,260.00 2,750.00 5.91 1.00
6/30/2022 11582 30-243 20,270.00 2,750.00 7.37 1.00
6/30/2022 11583 30-366 19,740.00 2,750.00 7.18 1.00
6/30/2022 11584 30-273 19,100.00 2,750.00 6.95 1.00
6/30/2022 11585 30-360 17,030.00 2,750.00 6.19 1.00
6/30/2022 11586 30-299 16,480.00 2,750.00 5.99 1.00
6/30/2022 11587 30-358 19,240.00 2,750.00 7.00 1.00
6/30/2022 11588 30-297 18,090.00 2,750.00 6.58 1.00
6/30/2022 11589 30-294 13,940.00 2,750.00 5.07 1.00
6/30/2022 11590 30-275 22,320.00 2,750.00 8.12 1.00
6/30/2022 11591 30-300 15,840.00 2,750.00 5.76 1.00
6/30/2022 11592 30-366 21,290.00 2,750.00 7.74 1.00
6/30/2022 11593 30-243 18,010.00 2,750.00 6.55 1.00
6/30/2022 11594 30-360 20,060.00 2,750.00 7.29 1.00
6/30/2022 11595 30-296 18,540.00 2,750.00 6.74 1.00
6/30/2022 11596 30-358 19,200.00 2,750.00 6.98 1.00
6/30/2022 11597 30-273 21,970.00 2,750.00 7.99 1.00
6/30/2022 11598 30-133 9,390.00 2,750.00 3.41 1.00
6/30/2022 11599 30-562 13,520.00 2,750.00 4.92 1.00
6/30/2022 11600 30-299 16,570.00 2,750.00 6.03 1.00
6/30/2022 11601 30-294 16,420.00 2,750.00 5.97 1.00
6/30/2022 11602 30-275 20,360.00 2,750.00 7.40 1.00
6/30/2022 11603 30-297 20,400.00 2,750.00 7.42 1.00
6/30/2022 11604 30-300 19,460.00 2,750.00 7.08 1.00
6/30/2022 11605 30-366 19,490.00 2,750.00 7.09 1.00
6/30/2022 11606 30-243 20,180.00 2,750.00 7.34 1.00
6/30/2022 11607 30-133 12,140.00 2,750.00 4.41 1.00
6/30/2022 11608 30-358 22,410.00 2,750.00 8.15 1.00
6/30/2022 11609 30-360 19,600.00 2,750.00 7.13 1.00
6/30/2022 11610 30-275 19,730.00 2,750.00 7.17 1.00
6/30/2022 11611 30-294 17,080.00 2,750.00 6.21 1.00
6/30/2022 11612 30-296 20,730.00 2,750.00 7.54 1.00
6/30/2022 11613 30-562 14,840.00 2,750.00 5.40 1.00
6/30/2022 11614 30-299 19,850.00 2,750.00 7.22 1.00
6/30/2022 11615 30-300 20,380.00 2,750.00 7.41 1.00
6/30/2022 11616 30-366 18,560.00 2,750.00 6.75 1.00
6/30/2022 11617 30-443 16,140.00 2,750.00 5.87 1.00
6/30/2022 11618 30-817 8,500.00 2,750.00 3.09 1.00
6/30/2022 11619 30-133 10,640.00 2,750.00 3.87 1.00
6/30/2022 11620 30-358 20,140.00 2,750.00 7.32 1.00
6/30/2022 11621 30-365 18,640.00 2,750.00 6.78 1.00
6/30/2022 11622 30-275 18,580.00 2,750.00 6.76 1.00
6/30/2022 11623 30-243 18,560.00 2,750.00 6.75 1.00
6/30/2022 11624 30-296 21,020.00 2,750.00 7.64 1.00
6/30/2022 11625 30-562 15,350.00 2,750.00 5.58 1.00
6/30/2022 11626 30-360 15,900.00 2,750.00 5.78 1.00
6/30/2022 11627 30-299 19,700.00 2,750.00 7.16 1.00
6/30/2022 11628 30-294 18,930.00 2,750.00 6.88 1.00
TOTALES 1,053,370.00 165,000.00 383.05 60.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - -36 30--36


Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -56 30--56
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -56 30--56
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -81 30--81
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -56 30--56
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/1/2022 11629 30296 15,490.00 2,750.00 5.63 1.00
7/1/2022 11630 30364 17,030.00 2,750.00 6.19 1.00
7/1/2022 11631 30366 18,030.00 2,750.00 6.56 1.00
7/1/2022 11632 30275 19,680.00 2,750.00 7.16 1.00
7/1/2022 11633 30360 19,140.00 2,750.00 6.96 1.00
7/1/2022 11634 30358 21,040.00 2,750.00 7.65 1.00
7/1/2022 11635 30275 14,760.00 2,750.00 5.37 1.00
7/1/2022 11636 30294 18,740.00 2,750.00 6.81 1.00
7/1/2022 11637 30297 23,210.00 2,750.00 8.44 1.00
TOTALES 167,120.00 24,750.00 60.77 9.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 296 30-296


Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/2/2022 11638 30-366 17,150.00 2,750.00 6.24 1.00
7/2/2022 11639 30-360 15,740.00 2,750.00 5.72 1.00
7/2/2022 11640 30-445 16,630.00 2,750.00 6.05 1.00
7/2/2022 11641 30-366 17,580.00 2,750.00 6.39 1.00
7/2/2022 11642 30-133 12,140.00 2,750.00 4.41 1.00
7/2/2022 11643 30-299 17,470.00 2,750.00 6.35 1.00
7/2/2022 11644 30-360 16,880.00 2,750.00 6.14 1.00
7/2/2022 11645 30-273 18,920.00 2,750.00 6.88 1.00
7/2/2022 11646 30-243 13,510.00 2,750.00 4.91 1.00
7/2/2022 11647 30-364 19,080.00 2,750.00 6.94 1.00
7/2/2022 11648 30-296 17,070.00 2,750.00 6.21 1.00
7/2/2022 11649 30-294 14,960.00 2,750.00 5.44 1.00
7/2/2022 11650 30-300 16,660.00 2,750.00 6.06 1.00
7/2/2022 11651 30-275 16,950.00 2,750.00 6.16 1.00
7/2/2022 11652 30-358 20,390.00 2,750.00 7.41 1.00
7/2/2022 11653 30-366 19,430.00 2,750.00 7.07 1.00
7/2/2022 11654 30-297 18,180.00 2,750.00 6.61 1.00
7/2/2022 11655 30-300 17,500.00 2,750.00 6.36 1.00
7/2/2022 11656 30-360 15,730.00 2,750.00 5.72 1.00
7/2/2022 11657 30-273 20,500.00 2,750.00 7.45 1.00
7/2/2022 11658 30-275 20,620.00 2,750.00 7.50 1.00
7/2/2022 11659 30-366 12,190.00 2,750.00 4.43 1.00
TOTALES 375,280.00 60,500.00 136.45 22.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - -36 30--36


Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -44 30--44
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/3/2022 11660 30275 20,620.00 2,750.00 7.50 1.00
7/3/2022 11661 30296 17,990.00 2,750.00 6.54 1.00
7/3/2022 11662 30366 12,190.00 2,750.00 4.43 1.00
7/3/2022 11663 30807 10,900.00 2,750.00 3.96 1.00
7/3/2022 11664 30810 9,230.00 2,750.00 3.36 1.00
7/3/2022 11665 30125 14,700.00 2,750.00 5.35 1.00
7/3/2022 11666 30106 7,540.00 2,750.00 2.74 1.00
7/3/2022 11667 30475 8,210.00 2,750.00 2.99 1.00
7/3/2022 11668 30438 13,430.00 2,750.00 4.88 1.00
7/3/2022 11669 30350 13,950.00 2,750.00 5.07 1.00
7/3/2022 11670 30360 14,050.00 2,750.00 5.11 1.00
7/3/2022 11671 30275 14,150.00 2,750.00 5.15 1.00
7/3/2022 11672 30807 15,240.00 2,750.00 5.54 1.00
7/3/2022 11673 30296 12,720.00 2,750.00 4.63 1.00
7/3/2022 11674 30365 16,360.00 2,750.00 5.95 1.00
7/3/2022 11675 30294 10,930.00 2,750.00 3.97 1.00
7/3/2022 11676 30299 14,480.00 2,750.00 5.27 1.00
7/3/2022 11677 30366 14,680.00 2,750.00 5.34 1.00
7/3/2022 11678 30810 13,770.00 2,750.00 5.01 1.00
7/3/2022 11679 30184 10,660.00 2,750.00 3.88 1.00
7/3/2022 11680 30297 19,750.00 2,750.00 7.18 1.00
7/3/2022 11681 30274 12,400.00 2,750.00 4.51 1.00
7/3/2022 11682 30483 13,720.00 2,750.00 4.99 1.00
7/3/2022 11683 30360 13,120.00 2,750.00 4.77 1.00
7/3/2022 11684 30445 19,240.00 2,750.00 7.00 1.00
7/3/2022 11685 30373 10,960.00 2,750.00 3.99 1.00
7/3/2022 11686 30364 12,010.00 2,750.00 4.37 1.00
7/3/2022 11687 30300 15,990.00 2,750.00 5.81 1.00
7/3/2022 11688 30273 13,500.00 2,750.00 4.91 1.00
7/3/2022 11689 30133 13,640.00 2,750.00 4.96 1.00
7/3/2022 11690 30807 15,840.00 2,750.00 5.76 1.00
7/3/2022 11691 30373 19,510.00 2,750.00 7.09 1.00
7/3/2022 11692 30810 16,000.00 2,750.00 5.82 1.00
7/3/2022 11693 30365 19,270.00 2,750.00 7.01 1.00
7/3/2022 11694 30296 16,620.00 2,750.00 6.04 1.00
7/3/2022 11695 30275 15,810.00 2,750.00 5.75 1.00
7/3/2022 11696 30133 12,710.00 2,750.00 4.62 1.00
7/3/2022 11697 30474 13,710.00 2,750.00 4.99 1.00
7/3/2022 11698 30125 18,900.00 2,750.00 6.87 1.00
7/3/2022 11699 30358 15,100.00 2,750.00 5.49 1.00
7/3/2022 11700 30366 16,140.00 2,750.00 5.87 1.00
7/3/2022 11701 30184 8,310.00 2,750.00 3.02 1.00
7/3/2022 11702 30373 17,150.00 2,750.00 6.24 1.00
7/3/2022 11703 30274 22,870.00 2,750.00 8.32 1.00
7/3/2022 11704 30300 18,460.00 2,750.00 6.71 1.00
7/3/2022 11705 30294 14,910.00 2,750.00 5.42 1.00
7/3/2022 11706 30364 19,540.00 2,750.00 7.11 1.00
7/3/2022 11707 30273 13,670.00 2,750.00 4.97 1.00
7/3/2022 11708 30297 17,470.00 2,750.00 6.35 1.00
7/3/2022 11709 30360 13,700.00 2,750.00 4.98 1.00
TOTALES 735,820.00 137,500.00 267.59 50.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 275 30-275


Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 810 30-810
Bolon CAMBIO LINEA WAWA 30 - 125 30-125
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 475 30-475
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 350 30-350
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 810 30-810
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 483 30-483
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 445 30-445
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 810 30-810
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 474 30-474
Bolon CAMBIO LINEA WAWA 30 - 125 30-125
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/4/2022 11711 30-133 12,020.00 2,750.00 4.37 1.00
7/4/2022 11712 30-300 18,170.00 2,750.00 6.61 1.00
7/4/2022 11713 30-474 21,220.00 2,750.00 7.72 1.00
7/4/2022 11714 30-275 14,370.00 2,750.00 5.23 1.00
7/4/2022 11715 30-273 15,460.00 2,750.00 5.62 1.00
7/4/2022 11716 30-294 12,730.00 2,750.00 4.63 1.00
7/4/2022 11717 30-296 21,150.00 2,750.00 7.69 1.00
7/4/2022 11718 30-299 15,000.00 2,750.00 5.45 1.00
7/4/2022 11719 30-184 12,670.00 2,750.00 4.61 1.00
7/4/2022 11720 30-358 18,490.00 2,750.00 6.72 1.00
7/4/2022 11721 30-562 13,270.00 2,750.00 4.83 1.00
7/4/2022 11722 30-297 13,290.00 2,750.00 4.83 1.00
7/4/2022 11723 30-243 21,800.00 2,750.00 7.93 1.00
7/4/2022 11724 30-365 19,830.00 2,750.00 7.21 1.00
7/4/2022 11725 30-300 19,460.00 2,750.00 7.08 1.00
7/4/2022 11726 30-368 15,490.00 2,750.00 5.63 1.00
7/4/2022 11727 30-184 10,910.00 2,750.00 3.97 1.00
7/4/2022 11728 30-275 20,530.00 2,750.00 7.47 1.00
7/4/2022 11729 30-294 13,970.00 2,750.00 5.08 1.00
7/4/2022 11730 30-164 11,120.00 2,750.00 4.04 1.00
7/4/2022 11731 30-273 18,830.00 2,750.00 6.85 1.00
7/4/2022 11732 30-364 18,130.00 2,750.00 6.59 1.00
7/4/2022 11733 30-296 13,550.00 2,750.00 4.93 1.00
7/4/2022 11734 30-299 12,980.00 2,750.00 4.72 1.00
7/4/2022 11735 30-297 16,400.00 2,750.00 5.96 1.00
7/4/2022 11736 30-365 17,160.00 2,750.00 6.24 1.00
7/4/2022 11737 30-562 16,070.00 2,750.00 5.84 1.00
7/4/2022 11738 30-243 12,280.00 2,750.00 4.47 1.00
7/4/2022 11739 30-300 16,250.00 2,750.00 5.91 1.00
7/4/2022 11740 30-164 13,430.00 2,750.00 4.88 1.00
7/4/2022 11741 30-184 9,420.00 2,750.00 3.43 1.00
7/4/2022 11742 30-364 19,570.00 2,750.00 7.12 1.00
7/4/2022 11743 30-296 17,540.00 2,750.00 6.38 1.00
7/4/2022 11744 30-273 17,810.00 2,750.00 6.48 1.00
7/4/2022 11745 30-300 20,240.00 2,750.00 7.36 1.00
7/4/2022 11746 30-365 19,390.00 2,750.00 7.05 1.00
7/4/2022 11747 30-366 20,060.00 2,750.00 7.29 1.00
7/4/2022 11748 30-299 17,980.00 2,750.00 6.54 1.00
7/4/2022 11749 30-358 22,130.00 2,750.00 8.05 1.00
7/4/2022 11750 30-294 14,140.00 2,750.00 5.14 1.00
7/4/2022 11751 30-562 12,410.00 2,750.00 4.51 1.00
7/4/2022 11752 30-243 19,230.00 2,750.00 6.99 1.00
7/4/2022 11753 30-133 11,840.00 2,750.00 4.31 1.00
7/4/2022 11754 30-297 17,760.00 2,750.00 6.46 1.00
TOTALES 715,550.00 121,000.00 260.22 44.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - -13 30--13


Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -47 30--47
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -56 30--56
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -16 30--16
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -56 30--56
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -16 30--16
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -35 30--35
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -56 30--56
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/5/2022 11755 30-364 16,860.00 2,750.00 6.13 1.00
7/5/2022 11756 30-344 22,460.00 2,750.00 8.17 1.00
7/5/2022 11757 30-294 16,970.00 2,750.00 6.17 1.00
7/5/2022 11758 30-296 19,260.00 2,750.00 7.00 1.00
7/5/2022 11759 30-133 9,900.00 2,750.00 3.60 1.00
7/5/2022 11760 30-562 14,900.00 2,750.00 5.42 1.00
7/5/2022 11761 30-184 10,810.00 2,750.00 3.93 1.00
7/5/2022 11762 30-299 13,260.00 2,750.00 4.82 1.00
7/5/2022 11763 30-296 17,180.00 2,750.00 6.25 1.00
7/5/2022 11764 30-294 13,230.00 2,750.00 4.81 1.00
7/5/2022 11765 30-299 14,760.00 2,750.00 5.37 1.00
7/5/2022 11766 30-184 12,750.00 2,750.00 4.64 1.00
7/5/2022 11767 30-296 16,640.00 2,750.00 6.05 1.00
7/5/2022 11768 30-294 12,870.00 2,750.00 4.68 1.00
7/5/2022 11769 30-273 14,960.00 2,750.00 5.44 1.00
7/5/2022 11770 30-133 10,160.00 2,750.00 3.69 1.00
7/5/2022 11771 30-184 7,550.00 2,750.00 2.75 1.00
7/5/2022 11772 30-299 16,800.00 2,750.00 6.11 1.00
7/5/2022 11773 30-562 12,950.00 2,750.00 4.71 1.00
7/5/2022 11774 30-296 15,740.00 2,750.00 5.72 1.00
7/5/2022 11775 30-243 17,410.00 2,750.00 6.33 1.00
7/5/2022 11776 30-299 16,500.00 2,750.00 6.00 1.00
7/5/2022 11777 30-294 13,740.00 2,750.00 5.00 1.00
TOTALES 337,660.00 63,250.00 122.79 23.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - -36 30--36


Bolon CAMBIO LINEA WAWA 30 - -34 30--34
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -56 30--56
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -27 30--27
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -56 30--56
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/6/2022 11778 30133 7,180.00 2,750.00 2.61 1.00
7/6/2022 11779 30243 13,430.00 2,750.00 4.88 1.00
7/6/2022 11780 30296 14,800.00 2,750.00 5.38 1.00
7/6/2022 11781 30294 15,230.00 2,750.00 5.54 1.00
7/6/2022 11782 30184 10,320.00 2,750.00 3.75 1.00
7/6/2022 11783 30300 12,470.00 2,750.00 4.53 1.00
7/6/2022 11784 30299 19,300.00 2,750.00 7.02 1.00
7/6/2022 11785 30562 15,490.00 2,750.00 5.63 1.00
7/6/2022 11786 30274 18,520.00 2,750.00 6.73 1.00
7/6/2022 11787 30133 10,450.00 2,750.00 3.80 1.00
7/6/2022 11788 30243 14,970.00 2,750.00 5.44 1.00
7/6/2022 11789 30273 15,140.00 2,750.00 5.51 1.00
7/6/2022 11790 30275 17,000.00 2,750.00 6.18 1.00
7/6/2022 11791 30296 14,930.00 2,750.00 5.43 1.00
7/6/2022 11792 30358 16,890.00 2,750.00 6.14 1.00
7/6/2022 11793 30360 19,720.00 2,750.00 7.17 1.00
7/6/2022 11794 30184 9,450.00 2,750.00 3.44 1.00
7/6/2022 11795 30294 13,020.00 2,750.00 4.73 1.00
7/6/2022 11796 30300 15,600.00 2,750.00 5.67 1.00
7/6/2022 11797 30299 14,250.00 2,750.00 5.18 1.00
7/6/2022 11798 30296 15,000.00 2,750.00 5.45 1.00
7/6/2022 11799 30366 15,630.00 2,750.00 5.68 1.00
7/6/2022 11800 30275 13,490.00 2,750.00 4.91 1.00
7/6/2022 11801 30243 17,350.00 2,750.00 6.31 1.00
7/6/2022 11802 30273 15,780.00 2,750.00 5.74 1.00
7/6/2022 11803 30358 16,230.00 2,750.00 5.90 1.00
7/6/2022 11804 30274 20,820.00 2,750.00 7.57 1.00
7/6/2022 11805 30296 18,170.00 2,750.00 6.61 1.00
7/6/2022 11806 30133 10,860.00 2,750.00 3.95 1.00
7/6/2022 11807 30300 17,150.00 2,750.00 6.24 1.00
7/6/2022 11808 30299 17,880.00 2,750.00 6.50 1.00
7/6/2022 11809 30184 10,100.00 2,750.00 3.67 1.00
7/6/2022 11810 30366 20,870.00 2,750.00 7.59 1.00
7/6/2022 11811 30274 17,450.00 2,750.00 6.35 1.00
TOTALES 514,940.00 93,500.00 187.23 34.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 133 30-133


Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/7/2022 11812 30133 11,070.00 2,750.00 4.03 1.00
7/7/2022 11813 30296 13,700.00 2,750.00 4.98 1.00
7/7/2022 11814 30299 14,030.00 2,750.00 5.10 1.00
7/7/2022 11815 30294 14,310.00 2,750.00 5.20 1.00
7/7/2022 11816 30296 19,090.00 2,750.00 6.94 1.00
7/7/2022 11817 30562 13,130.00 2,750.00 4.77 1.00
7/7/2022 11818 30133 10,140.00 2,750.00 3.69 1.00
7/7/2022 11819 30299 19,030.00 2,750.00 6.92 1.00
7/7/2022 11820 30299 19,030.00 2,750.00 6.92 1.00
7/7/2022 11821 30296 16,590.00 2,750.00 6.03 1.00
7/7/2022 11822 30294 14,360.00 2,750.00 5.22 1.00
7/7/2022 11823 30299 18,380.00 2,750.00 6.68 1.00
7/7/2022 11824 30562 13,600.00 2,750.00 4.95 1.00
TOTALES 196,460.00 35,750.00 71.43 13.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 133 30-133


Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/8/2022 11825 30275 14,160.00 2,750.00 5.15 1.00
7/8/2022 11826 30296 20,570.00 2,750.00 7.48 1.00
7/8/2022 11827 30243 15,980.00 2,750.00 5.81 1.00
7/8/2022 11828 30294 15,250.00 2,750.00 5.55 1.00
7/8/2022 11829 30275 29,400.00 2,750.00 10.69 1.00
7/8/2022 11830 30300 17,110.00 2,750.00 6.22 1.00
7/8/2022 11831 30133 9,210.00 2,750.00 3.35 1.00
7/8/2022 11832 30296 13,050.00 2,750.00 4.75 1.00
7/8/2022 11833 30299 18,400.00 2,750.00 6.69 1.00
7/8/2022 11834 30294 13,130.00 2,750.00 4.77 1.00
7/8/2022 11835 30243 18,960.00 2,750.00 6.89 1.00
7/8/2022 11836 30275 14,320.00 2,750.00 5.21 1.00
7/8/2022 11837 30296 14,640.00 2,750.00 5.32 1.00
7/8/2022 11838 30299 15,620.00 2,750.00 5.68 1.00
7/8/2022 11839 30275 16,110.00 2,750.00 5.86 1.00
7/8/2022 11840 30296 15,360.00 2,750.00 5.59 1.00
7/8/2022 11841 30133 5,410.00 2,750.00 1.97 1.00
7/8/2022 11842 30243 13,060.00 2,750.00 4.75 1.00
7/8/2022 11843 30562 14,670.00 2,750.00 5.33 1.00
7/8/2022 11844 30300 13,470.00 2,750.00 4.90 1.00
7/8/2022 11845 30275 13,300.00 2,750.00 4.84 1.00
7/8/2022 11846 30296 10,700.00 2,750.00 3.89 1.00
7/8/2022 11847 30299 13,130.00 2,750.00 4.77 1.00
7/8/2022 11848 30562 15,290.00 2,750.00 5.56 1.00
7/8/2022 11849 30133 9,170.00 2,750.00 3.33 1.00
TOTALES 369,470.00 68,750.00 134.35 25.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 275 30-275


Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/9/2022 11850 30296 28,490.00 2,750.00 10.36 1.00
7/9/2022 11851 30275 15,000.00 2,750.00 5.45 1.00
7/9/2022 11852 30562 16,490.00 2,750.00 6.00 1.00
7/9/2022 11853 30133 10,840.00 2,750.00 3.94 1.00
7/9/2022 11854 30296 13,910.00 2,750.00 5.06 1.00
7/9/2022 11855 30562 14,630.00 2,750.00 5.32 1.00
7/9/2022 11856 30243 14,970.00 2,750.00 5.44 1.00
7/9/2022 11857 30184 11,040.00 2,750.00 4.01 1.00
7/9/2022 11858 30275 15,190.00 2,750.00 5.52 1.00
7/9/2022 11859 30133 9,790.00 2,750.00 3.56 1.00
7/9/2022 11860 30296 18,570.00 2,750.00 6.75 1.00
7/9/2022 11861 30243 15,560.00 2,750.00 5.66 1.00
7/9/2022 11862 30184 10,770.00 2,750.00 3.92 1.00
7/9/2022 11863 30275 11,030.00 2,750.00 4.01 1.00
7/9/2022 11864 30133 8,900.00 2,750.00 3.24 1.00
7/9/2022 11865 30184 9,390.00 2,750.00 3.41 1.00
7/9/2022 11866 30243 16,590.00 2,750.00 6.03 1.00
7/9/2022 11867 30275 14,080.00 2,750.00 5.12 1.00
7/9/2022 11868 30133 8,010.00 2,750.00 2.91 1.00
7/9/2022 11869 30300 14,550.00 2,750.00 5.29 1.00
7/9/2022 11870 30299 15,150.00 2,750.00 5.51 1.00
7/9/2022 11871 30562 14,450.00 2,750.00 5.25 1.00
7/9/2022 11872 30294 9,860.00 2,750.00 3.59 1.00
7/9/2022 11873 30275 16,330.00 2,750.00 5.94 1.00
7/9/2022 11874 30184 14,580.00 2,750.00 5.30 1.00
TOTALES 348,170.00 68,750.00 126.59 25.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 296 30-296


Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/11/2022 11875 30-184 22,760.00 2,750.00 8.28 1.00
7/11/2022 11876 30-562 12,380.00 2,750.00 4.50 1.00
7/11/2022 11877 30-299 16,410.00 2,750.00 5.97 1.00
7/11/2022 11878 30-296 17,440.00 2,750.00 6.34 1.00
7/11/2022 11879 30-243 16,780.00 2,750.00 6.10 1.00
7/11/2022 11880 30-365 14,790.00 2,750.00 5.38 1.00
7/11/2022 11881 30-300 15,730.00 2,750.00 5.72 1.00
7/11/2022 11882 30-299 18,280.00 2,750.00 6.65 1.00
7/11/2022 11883 30-296 15,420.00 2,750.00 5.61 1.00
7/11/2022 11884 30-184 9,400.00 2,750.00 3.42 1.00
7/11/2022 11885 30-243 14,250.00 2,750.00 5.18 1.00
7/11/2022 11886 30-365 14,640.00 2,750.00 5.32 1.00
7/11/2022 11887 30-300 14,320.00 2,750.00 5.21 1.00
7/11/2022 11888 30-296 14,310.00 2,750.00 5.20 1.00
7/11/2022 11889 30-299 11,790.00 2,750.00 4.29 1.00
7/11/2022 11890 30-133 9,140.00 2,750.00 3.32 1.00
7/11/2022 11891 30-184 8,370.00 2,750.00 3.04 1.00
7/11/2022 11892 30-243 16,670.00 2,750.00 6.06 1.00
7/11/2022 11893 30-562 13,380.00 2,750.00 4.87 1.00
7/11/2022 11894 30-365 15,930.00 2,750.00 5.79 1.00
7/11/2022 11895 30-299 16,470.00 2,750.00 5.99 1.00
7/11/2022 11896 30-296 15,740.00 2,750.00 5.72 1.00
7/11/2022 11897 30-300 12,760.00 2,750.00 4.64 1.00
7/11/2022 11898 30-133 9,000.00 2,750.00 3.27 1.00
7/11/2022 11899 30-562 11,950.00 2,750.00 4.35 1.00
7/11/2022 11900 30-184 7,980.00 2,750.00 2.90 1.00
7/11/2022 11901 30-243 14,860.00 2,750.00 5.40 1.00
TOTALES 380,950.00 74,250.00 138.52 27.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - -18 30--18


Bolon CAMBIO LINEA WAWA 30 - -56 30--56
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Bolon CAMBIO LINEA WAWA 30 - -56 30--56
Bolon CAMBIO LINEA WAWA 30 - -36 30--36
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -29 30--29
Bolon CAMBIO LINEA WAWA 30 - -30 30--30
Bolon CAMBIO LINEA WAWA 30 - -13 30--13
Bolon CAMBIO LINEA WAWA 30 - -56 30--56
Bolon CAMBIO LINEA WAWA 30 - -18 30--18
Bolon CAMBIO LINEA WAWA 30 - -24 30--24
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/12/2022 11902 30294 12,760.00 2,750.00 4.64 1.00
7/12/2022 11903 30183 13,400.00 2,750.00 4.87 1.00
7/12/2022 11904 30296 14,880.00 2,750.00 5.41 1.00
7/12/2022 11905 30243 4,520.00 2,750.00 1.64 1.00
7/12/2022 11906 30296 15,730.00 2,750.00 5.72 1.00
7/12/2022 11907 30300 16,000.00 2,750.00 5.82 1.00
7/12/2022 11908 30365 12,920.00 2,750.00 4.70 1.00
7/12/2022 11909 30243 14,420.00 2,750.00 5.24 1.00
7/12/2022 11910 30299 14,910.00 2,750.00 5.42 1.00
7/12/2022 11911 30294 11,650.00 2,750.00 4.24 1.00
7/12/2022 11912 30364 13,490.00 2,750.00 4.91 1.00
7/12/2022 11913 30184 11,420.00 2,750.00 4.15 1.00
7/12/2022 11914 30296 15,580.00 2,750.00 5.67 1.00
7/12/2022 11915 30365 16,730.00 2,750.00 6.08 1.00
7/12/2022 11916 30366 18,000.00 2,750.00 6.55 1.00
7/12/2022 11917 30294 15,010.00 2,750.00 5.46 1.00
7/12/2022 11918 30299 15,980.00 2,750.00 5.81 1.00
7/12/2022 11919 30243 22,180.00 2,750.00 8.07 1.00
7/12/2022 11920 30133 10,860.00 2,750.00 3.95 1.00
7/12/2022 11921 30184 10,420.00 2,750.00 3.79 1.00
7/12/2022 11922 30364 17,010.00 2,750.00 6.19 1.00
TOTALES 297,870.00 57,750.00 108.33 21.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 294 30-294


Bolon CAMBIO LINEA WAWA 30 - 183 30-183
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/13/2022 11923 30133 9,840.00 2,750.00 3.58 1.00
7/13/2022 11924 30274 23,430.00 2,750.00 8.52 1.00
7/13/2022 11925 30366 29,320.00 2,750.00 10.66 1.00
7/13/2022 11926 30184 10,520.00 2,750.00 3.83 1.00
7/13/2022 11927 30296 14,860.00 2,750.00 5.40 1.00
7/13/2022 11928 30243 16,970.00 2,750.00 6.17 1.00
7/13/2022 11929 30300 16,790.00 2,750.00 6.11 1.00
7/13/2022 11930 30364 15,850.00 2,750.00 5.76 1.00
7/13/2022 11931 30299 15,550.00 2,750.00 5.65 1.00
7/13/2022 11932 30297 9,330.00 2,750.00 3.39 1.00
7/13/2022 11933 30366 17,290.00 2,750.00 6.29 1.00
7/13/2022 11934 30297 27,110.00 2,750.00 9.86 1.00
7/13/2022 11935 30184 5,720.00 2,750.00 2.08 1.00
7/13/2022 11936 30296 14,660.00 2,750.00 5.33 1.00
7/13/2022 11937 30364 14,820.00 2,750.00 5.39 1.00
7/13/2022 11938 30243 18,050.00 2,750.00 6.56 1.00
7/13/2022 11939 30274 14,660.00 2,750.00 5.33 1.00
7/13/2022 11940 30300 14,890.00 2,750.00 5.41 1.00
7/13/2022 11941 30299 14,610.00 2,750.00 5.31 1.00
7/13/2022 11942 30133 5,350.00 2,750.00 1.95 1.00
7/13/2022 11943 30296 10,670.00 2,750.00 3.88 1.00
7/13/2022 11944 30184 6,420.00 2,750.00 2.33 1.00
7/13/2022 11945 30364 14,060.00 2,750.00 5.11 1.00
7/13/2022 11946 30243 20,730.00 2,750.00 7.54 1.00
7/13/2022 11947 30365 3,100.00 2,750.00 1.13 1.00
7/13/2022 11948 30274 21,800.00 2,750.00 7.93 1.00
7/13/2022 11949 30300 13,180.00 2,750.00 4.79 1.00
7/13/2022 11950 30299 12,560.00 2,750.00 4.57 1.00
7/13/2022 11951 30297 10,910.00 2,750.00 3.97 1.00
7/13/2022 11952 30296 16,250.00 2,750.00 5.91 1.00
7/13/2022 11953 30366 14,900.00 2,750.00 5.42 1.00
7/13/2022 11954 30562 18,250.00 2,750.00 6.64 1.00
7/13/2022 11955 30365 12,350.00 2,750.00 4.49 1.00
7/13/2022 11956 30184 4,000.00 2,750.00 1.45 1.00
7/13/2022 11957 30243 18,760.00 2,750.00 6.82 1.00
7/13/2022 11958 30299 11,160.00 2,750.00 4.06 1.00
7/13/2022 11959 30300 11,110.00 2,750.00 4.04 1.00
7/13/2022 11960 30296 12,740.00 2,750.00 4.63 1.00
7/13/2022 11961 30366 12,600.00 2,750.00 4.58 1.00
TOTALES 555,170.00 107,250.00 201.87 39.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 133 30-133


Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/14/2022 11962 30274 11,220.00 2,750.00 4.08 1.00
7/14/2022 11963 30365 10,010.00 2,750.00 3.64 1.00
7/14/2022 11964 30299 10,730.00 2,750.00 3.90 1.00
7/14/2022 11965 30300 13,310.00 2,750.00 4.84 1.00
7/14/2022 11966 30297 13,230.00 2,750.00 4.81 1.00
7/14/2022 11967 30243 14,010.00 2,750.00 5.09 1.00
7/14/2022 11968 30184 5,290.00 2,750.00 1.92 1.00
7/14/2022 11969 30366 13,790.00 2,750.00 5.01 1.00
7/14/2022 11970 30364 12,640.00 2,750.00 4.60 1.00
7/14/2022 11971 30562 12,480.00 2,750.00 4.54 1.00
7/14/2022 11972 30274 12,700.00 2,750.00 4.62 1.00
7/14/2022 11973 30365 12,640.00 2,750.00 4.60 1.00
7/14/2022 11974 30300 13,100.00 2,750.00 4.76 1.00
7/14/2022 11975 30366 16,950.00 2,750.00 6.16 1.00
7/14/2022 11976 30299 13,840.00 2,750.00 5.03 1.00
7/14/2022 11977 30184 7,290.00 2,750.00 2.65 1.00
7/14/2022 11978 30296 15,110.00 2,750.00 5.49 1.00
7/14/2022 11979 30297 15,840.00 2,750.00 5.76 1.00
7/14/2022 11980 30365 14,710.00 2,750.00 5.35 1.00
7/14/2022 11981 30364 16,410.00 2,750.00 5.97 1.00
7/14/2022 11982 30274 12,070.00 2,750.00 4.39 1.00
7/14/2022 11983 30243 17,650.00 2,750.00 6.42 1.00
7/14/2022 11984 30296 13,970.00 2,750.00 5.08 1.00
7/14/2022 11985 30184 6,040.00 2,750.00 2.20 1.00
7/14/2022 11986 30300 13,220.00 2,750.00 4.81 1.00
7/14/2022 11987 30562 13,660.00 2,750.00 4.97 1.00
7/14/2022 11988 30297 17,370.00 2,750.00 6.32 1.00
7/14/2022 11989 30366 16,660.00 2,750.00 6.06 1.00
7/14/2022 11990 30243 17,830.00 2,750.00 6.48 1.00
7/14/2022 11991 30365 15,780.00 2,750.00 5.74 1.00
7/14/2022 11992 30274 14,910.00 2,750.00 5.42 1.00
7/14/2022 11993 30299 13,670.00 2,750.00 4.97 1.00
7/14/2022 11994 30364 14,420.00 2,750.00 5.24 1.00
7/14/2022 11995 30296 13,820.00 2,750.00 5.03 1.00
7/14/2022 11996 30366 15,310.00 2,750.00 5.57 1.00
7/14/2022 11997 30184 7,560.00 2,750.00 2.75 1.00
7/14/2022 11998 30300 13,680.00 2,750.00 4.97 1.00
7/14/2022 11999 30297 17,360.00 2,750.00 6.31 1.00
7/14/2022 12000 30562 12,680.00 2,750.00 4.61 1.00
7/14/2022 12001 30243 14,460.00 2,750.00 5.26 1.00
7/14/2022 12002 30365 11,980.00 2,750.00 4.36 1.00
7/14/2022 12003 30299 12,680.00 2,750.00 4.61 1.00
7/14/2022 12004 30296 14,170.00 2,750.00 5.15 1.00
7/14/2022 12005 30364 12,610.00 2,750.00 4.59 1.00
7/14/2022 12006 30366 16,250.00 2,750.00 5.91 1.00
TOTALES 605,110.00 123,750.00 220.04 45.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 274 30-274


Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/15/2022 12007 30366 16,060.00 2,750.00 5.84 1.00
7/15/2022 12008 30296 15,300.00 2,750.00 5.56 1.00
7/15/2022 12009 30364 12,110.00 2,750.00 4.40 1.00
7/15/2022 12010 30297 15,370.00 2,750.00 5.59 1.00
7/15/2022 12011 30299 15,510.00 2,750.00 5.64 1.00
7/15/2022 12012 30300 16,980.00 2,750.00 6.17 1.00
7/15/2022 12013 30243 16,770.00 2,750.00 6.10 1.00
7/15/2022 12014 30562 12,830.00 2,750.00 4.67 1.00
7/15/2022 12015 30274 12,050.00 2,750.00 4.38 1.00
7/15/2022 12016 30365 13,560.00 2,750.00 4.93 1.00
7/15/2022 12017 30366 17,990.00 2,750.00 6.54 1.00
7/15/2022 12018 30364 15,010.00 2,750.00 5.46 1.00
7/15/2022 12019 30300 15,210.00 2,750.00 5.53 1.00
7/15/2022 12020 30297 17,480.00 2,750.00 6.36 1.00
7/15/2022 12021 30296 15,550.00 2,750.00 5.65 1.00
7/15/2022 12022 30299 14,240.00 2,750.00 5.18 1.00
7/15/2022 12023 30562 18,260.00 2,750.00 6.64 1.00
7/15/2022 12024 30365 16,940.00 2,750.00 6.16 1.00
7/15/2022 12025 30274 17,160.00 2,750.00 6.24 1.00
7/15/2022 12026 30366 19,390.00 2,750.00 7.05 1.00
TOTALES 313,770.00 55,000.00 114.09 20.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 366 30-366


Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/21/2022 12027 30360 17,990.00 2,750.00 6.54 1.00
7/21/2022 12028 30274 13,340.00 2,750.00 4.85 1.00
7/21/2022 12029 30300 10,940.00 2,750.00 3.98 1.00
7/21/2022 12030 30438 13,640.00 2,750.00 4.96 1.00
7/21/2022 12031 30299 17,160.00 2,750.00 6.24 1.00
7/21/2022 12032 30297 12,840.00 2,750.00 4.67 1.00
7/21/2022 12033 30366 16,770.00 2,750.00 6.10 1.00
7/21/2022 12034 30275 16,870.00 2,750.00 6.13 1.00
7/21/2022 12035 30303 13,330.00 2,750.00 4.85 1.00
7/21/2022 12036 30243 19,230.00 2,750.00 6.99 1.00
7/21/2022 12037 30562 13,970.00 2,750.00 5.08 1.00
7/21/2022 12038 30364 13,520.00 2,750.00 4.92 1.00
7/21/2022 12039 30294 13,630.00 2,750.00 4.96 1.00
7/21/2022 12040 30365 27,950.00 2,750.00 10.16 1.00
7/21/2022 12041 30184 14,950.00 2,750.00 5.44 1.00
7/21/2022 12042 30300 13,730.00 2,750.00 4.99 1.00
7/21/2022 12043 30299 15,950.00 2,750.00 5.80 1.00
7/21/2022 12044 30360 15,230.00 2,750.00 5.54 1.00
7/21/2022 12045 30366 19,060.00 2,750.00 6.93 1.00
7/21/2022 12046 30297 12,630.00 2,750.00 4.59 1.00
7/21/2022 12047 30303 16,130.00 2,750.00 5.87 1.00
7/21/2022 12048 30296 13,410.00 2,750.00 4.88 1.00
7/21/2022 12049 30275 16,310.00 2,750.00 5.93 1.00
7/21/2022 12050 30562 13,790.00 2,750.00 5.01 1.00
7/21/2022 12051 30274 17,290.00 2,750.00 6.29 1.00
7/21/2022 12052 30365 15,820.00 2,750.00 5.75 1.00
7/21/2022 12053 30300 12,280.00 2,750.00 4.47 1.00
7/21/2022 12054 30360 14,760.00 2,750.00 5.37 1.00
7/21/2022 12055 30299 15,500.00 2,750.00 5.64 1.00
7/21/2022 12056 30184 9,420.00 2,750.00 3.43 1.00
7/21/2022 12057 30275 17,320.00 2,750.00 6.30 1.00
7/21/2022 12058 30562 13,320.00 2,750.00 4.84 1.00
7/21/2022 12059 30493 13,070.00 2,750.00 4.75 1.00
7/21/2022 12060 30296 13,640.00 2,750.00 4.96 1.00
7/21/2022 12061 30297 16,910.00 2,750.00 6.15 1.00
7/21/2022 12062 30438 13,780.00 2,750.00 5.01 1.00
7/21/2022 12063 30274 16,090.00 2,750.00 5.85 1.00
7/21/2022 12064 30294 13,780.00 2,750.00 5.01 1.00
7/21/2022 12065 30335 14,720.00 2,750.00 5.35 1.00
7/21/2022 12066 30493 9,890.00 2,750.00 3.60 1.00
7/21/2022 12067 30275 18,380.00 2,750.00 6.68 1.00
7/21/2022 12068 30445 15,640.00 2,750.00 5.69 1.00
7/21/2022 12069 30184 9,050.00 2,750.00 3.29 1.00
7/21/2022 12070 30243 18,380.00 2,750.00 6.68 1.00
7/21/2022 12071 30365 26,050.00 2,750.00 9.47 1.00
7/21/2022 12072 30474 13,650.00 2,750.00 4.96 1.00
7/21/2022 12073 30430 14,280.00 2,750.00 5.19 1.00
7/21/2022 12074 30297 14,290.00 2,750.00 5.20 1.00
7/21/2022 12075 30296 13,730.00 2,750.00 4.99 1.00
7/21/2022 12076 30373 14,470.00 2,750.00 5.26 1.00
7/21/2022 12077 30125 13,900.00 2,750.00 5.05 1.00
7/21/2022 12078 30274 15,020.00 2,750.00 5.46 1.00
7/21/2022 12079 30300 16,490.00 2,750.00 6.00 1.00
7/21/2022 12080 30562 13,480.00 2,750.00 4.90 1.00
7/21/2022 12081 30443 10,140.00 2,750.00 3.69 1.00
7/21/2022 12082 30366 25,520.00 2,750.00 9.28 1.00
7/21/2022 12083 30294 17,260.00 2,750.00 6.28 1.00
7/21/2022 12084 30360 14,180.00 2,750.00 5.16 1.00
7/21/2022 12085 30373 13,580.00 2,750.00 4.94 1.00
7/21/2022 12086 30474 9,920.00 2,750.00 3.61 1.00
7/21/2022 12087 3096 14,490.00 2,750.00 5.27 1.00
7/21/2022 12088 30275 17,670.00 2,750.00 6.43 1.00
7/21/2022 12089 30365 18,150.00 2,750.00 6.60 1.00
7/21/2022 12090 30360 19,420.00 2,750.00 7.06 1.00
7/21/2022 12091 30430 13,280.00 2,750.00 4.83 1.00
7/21/2022 12092 30184 7,780.00 2,750.00 2.83 1.00
7/21/2022 12093 30297 17,300.00 2,750.00 6.29 1.00
7/21/2022 12094 30300 15,540.00 2,750.00 5.65 1.00
7/21/2022 12095 30296 15,070.00 2,750.00 5.48 1.00
7/21/2022 12096 30243 22,060.00 2,750.00 8.02 1.00
7/21/2022 12097 30562 11,820.00 2,750.00 4.30 1.00
7/21/2022 12098 30364 15,380.00 2,750.00 5.59 1.00
7/21/2022 12099 30373 15,120.00 2,750.00 5.50 1.00
7/21/2022 12100 30493 8,630.00 2,750.00 3.14 1.00
TOTALES 1,119,080.00 203,500.00 406.95 74.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 360 30-360


Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 335 30-335
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 445 30-445
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 474 30-474
Bolon CAMBIO LINEA WAWA 30 - 430 30-430
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 125 30-125
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 443 30-443
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 474 30-474
Bolon CAMBIO LINEA WAWA 30 - 96 30-96
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 430 30-430
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/22/2022 12101 30448 12,900.00 2,750.00 4.69 1.00
7/22/2022 12102 30445 16,540.00 2,750.00 6.01 1.00
7/22/2022 12103 30365 14,030.00 2,750.00 5.10 1.00
7/22/2022 12104 30364 13,890.00 2,750.00 5.05 1.00
7/22/2022 12105 30106 14,460.00 2,750.00 5.26 1.00
7/22/2022 12106 30373 16,370.00 2,750.00 5.95 1.00
7/22/2022 12107 30303 15,650.00 2,750.00 5.69 1.00
7/22/2022 12108 30296 17,030.00 2,750.00 6.19 1.00
7/22/2022 12109 30438 11,740.00 2,750.00 4.27 1.00
7/22/2022 12110 3096 12,710.00 2,750.00 4.62 1.00
7/22/2022 12111 30300 13,600.00 2,750.00 4.95 1.00
7/22/2022 12112 30164 12,180.00 2,750.00 4.43 1.00
7/22/2022 12113 30493 10,850.00 2,750.00 3.95 1.00
7/22/2022 12114 30807 15,300.00 2,750.00 5.56 1.00
7/22/2022 12115 30810 14,570.00 2,750.00 5.30 1.00
7/22/2022 12116 30474 13,170.00 2,750.00 4.79 1.00
7/22/2022 12117 30448 15,180.00 2,750.00 5.52 1.00
7/22/2022 12118 30294 13,680.00 2,750.00 4.97 1.00
7/22/2022 12119 30299 14,170.00 2,750.00 5.15 1.00
7/22/2022 12120 30360 17,580.00 2,750.00 6.39 1.00
7/22/2022 12121 30193 11,670.00 2,750.00 4.24 1.00
7/22/2022 12122 30184 9,170.00 2,750.00 3.33 1.00
7/22/2022 12123 30275 17,330.00 2,750.00 6.30 1.00
7/22/2022 12124 30366 18,220.00 2,750.00 6.63 1.00
7/22/2022 12125 30106 14,800.00 2,750.00 5.38 1.00
7/22/2022 12126 30274 14,340.00 2,750.00 5.21 1.00
7/22/2022 12127 30297 15,520.00 2,750.00 5.64 1.00
7/22/2022 12128 30562 15,030.00 2,750.00 5.47 1.00
7/22/2022 12129 30243 17,260.00 2,750.00 6.28 1.00
7/22/2022 12130 30448 16,720.00 2,750.00 6.08 1.00
7/22/2022 12131 30373 17,980.00 2,750.00 6.54 1.00
7/22/2022 12132 30438 13,370.00 2,750.00 4.86 1.00
7/22/2022 12133 30810 11,630.00 2,750.00 4.23 1.00
7/22/2022 12134 30807 15,170.00 2,750.00 5.52 1.00
7/22/2022 12135 30193 11,560.00 2,750.00 4.20 1.00
7/22/2022 12136 30144 10,680.00 2,750.00 3.88 1.00
7/22/2022 12137 30164 13,150.00 2,750.00 4.78 1.00
7/22/2022 12138 30474 14,710.00 2,750.00 5.35 1.00
7/22/2022 12139 30364 16,640.00 2,750.00 6.05 1.00
7/22/2022 12140 30300 16,180.00 2,750.00 5.88 1.00
7/22/2022 12141 30243 16,180.00 2,750.00 5.88 1.00
7/22/2022 12142 30294 15,000.00 2,750.00 5.45 1.00
7/22/2022 12143 30275 15,930.00 2,750.00 5.79 1.00
7/22/2022 12144 30296 15,080.00 2,750.00 5.48 1.00
7/22/2022 12145 30184 9,930.00 2,750.00 3.61 1.00
7/22/2022 12146 30299 16,440.00 2,750.00 5.98 1.00
7/22/2022 12147 30493 9,370.00 2,750.00 3.41 1.00
7/22/2022 12148 30297 11,760.00 2,750.00 4.28 1.00
7/22/2022 12149 30366 18,440.00 2,750.00 6.71 1.00
7/22/2022 12150 30243 20,300.00 2,750.00 7.38 1.00
7/22/2022 12151 30274 17,910.00 2,750.00 6.51 1.00
7/22/2022 12152 30133 8,100.00 2,750.00 2.95 1.00
7/22/2022 12153 30817 9,150.00 2,750.00 3.33 1.00
7/22/2022 12154 30438 10,350.00 2,750.00 3.76 1.00
7/22/2022 12155 30125 17,130.00 2,750.00 6.23 1.00
7/22/2022 12156 30106 12,370.00 2,750.00 4.50 1.00
7/22/2022 12157 30164 12,020.00 2,750.00 4.37 1.00
7/22/2022 12158 30562 13,920.00 2,750.00 5.06 1.00
7/22/2022 12159 30335 13,380.00 2,750.00 4.87 1.00
7/22/2022 12160 30448 13,000.00 2,750.00 4.73 1.00
7/22/2022 12161 30360 18,800.00 2,750.00 6.84 1.00
7/22/2022 12162 30364 12,900.00 2,750.00 4.69 1.00
7/22/2022 12163 2,750.00 0.00 1.00
7/22/2022 12164 30365 16,690.00 2,750.00 6.07 1.00
7/22/2022 12165 30144 9,770.00 2,750.00 3.55 1.00
7/22/2022 12166 30810 12,340.00 2,750.00 4.49 1.00
7/22/2022 12167 30300 16,090.00 2,750.00 5.85 1.00
7/22/2022 12168 30294 12,920.00 2,750.00 4.70 1.00
7/22/2022 12169 30296 13,480.00 2,750.00 4.90 1.00
7/22/2022 12170 30193 10,330.00 2,750.00 3.76 1.00
7/22/2022 12171 30275 15,770.00 2,750.00 5.73 1.00
7/22/2022 12172 30562 21,930.00 2,750.00 7.97 1.00
7/22/2022 12173 2,750.00 0.00 1.00
7/22/2022 12174 3096 11,220.00 2,750.00 4.08 1.00
7/22/2022 12175 30184 10,260.00 2,750.00 3.73 1.00
7/22/2022 12176 30303 15,630.00 2,750.00 5.68 1.00
7/22/2022 12177 30474 11,860.00 2,750.00 4.31 1.00
7/22/2022 12178 30730 13,920.00 2,750.00 5.06 1.00
7/22/2022 12179 30373 24,410.00 2,750.00 8.88 1.00
7/22/2022 12180 30817 13,940.00 2,750.00 5.07 1.00
7/22/2022 12181 30807 11,670.00 2,750.00 4.24 1.00
7/22/2022 12182 30366 18,760.00 2,750.00 6.82 1.00
7/22/2022 12183 30299 14,600.00 2,750.00 5.31 1.00
7/22/2022 12184 30438 8,770.00 2,750.00 3.19 1.00
7/22/2022 12185 30125 12,900.00 2,750.00 4.69 1.00
7/22/2022 12186 30243 20,220.00 2,750.00 7.35 1.00
7/22/2022 12187 30335 5,530.00 2,750.00 2.01 1.00
7/22/2022 12188 30164 11,020.00 2,750.00 4.01 1.00
7/22/2022 12189 30345 12,430.00 2,750.00 4.52 1.00
7/22/2022 12190 30274 18,100.00 2,750.00 6.58 1.00
7/22/2022 12191 30297 14,930.00 2,750.00 5.43 1.00
7/22/2022 12192 30193 12,780.00 2,750.00 4.65 1.00
7/22/2022 12193 30133 5,400.00 2,750.00 1.96 1.00
7/22/2022 12194 30364 4,090.00 2,750.00 1.49 1.00
7/22/2022 12195 2,750.00 0.00 1.00
7/22/2022 12196 30448 11,610.00 2,750.00 4.22 1.00
7/22/2022 12197 30299 14,530.00 2,750.00 5.28 1.00
7/22/2022 12198 2,750.00 0.00 1.00
7/22/2022 12199 30144 10,950.00 2,750.00 3.98 1.00
7/22/2022 12200 3096 12,090.00 2,750.00 4.40 1.00
7/22/2022 12201 30300 15,780.00 2,750.00 5.74 1.00
7/22/2022 12202 30345 21,350.00 2,750.00 7.76 1.00
7/22/2022 12203 30274 17,330.00 2,750.00 6.30 1.00
7/22/2022 12204 30193 15,940.00 2,750.00 5.80 1.00
7/22/2022 12205 30133 10,070.00 2,750.00 3.66 1.00
7/22/2022 12206 30810 13,290.00 2,750.00 4.83 1.00
7/22/2022 12207 30364 12,520.00 2,750.00 4.55 1.00
7/22/2022 12208 30335 17,740.00 2,750.00 6.45 1.00
TOTALES 1,459,150.00 297,000.00 530.55 108.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 448 30-448


Bolon CAMBIO LINEA WAWA 30 - 445 30-445
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 96 30-96
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 810 30-810
Bolon CAMBIO LINEA WAWA 30 - 474 30-474
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 193 30-193
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 810 30-810
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 193 30-193
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 474 30-474
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 817 30-817
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 125 30-125
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 335 30-335
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 810 30-810
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 193 30-193
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 96 30-96
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 474 30-474
Bolon CAMBIO LINEA WAWA 30 - 730 30-730
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 817 30-817
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 125 30-125
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 335 30-335
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 345 30-345
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 193 30-193
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 96 30-96
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 345 30-345
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 193 30-193
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 810 30-810
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 335 30-335
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/23/2022 12209 30193 10,010.00 2,750.00 3.64 1.00
7/23/2022 12210 30300 13,650.00 2,750.00 4.96 1.00
7/23/2022 12211 30303 18,890.00 2,750.00 6.87 1.00
7/23/2022 12212 30360 18,930.00 2,750.00 6.88 1.00
7/23/2022 12213 30144 9,550.00 2,750.00 3.47 1.00
7/23/2022 12214 30438 14,100.00 2,750.00 5.13 1.00
7/23/2022 12215 30366 20,700.00 2,750.00 7.53 1.00
7/23/2022 12216 30133 10,400.00 2,750.00 3.78 1.00
7/23/2022 12217 30296 15,520.00 2,750.00 5.64 1.00
7/23/2022 12218 30243 18,780.00 2,750.00 6.83 1.00
7/23/2022 12219 30184 11,270.00 2,750.00 4.10 1.00
7/23/2022 12220 30294 11,180.00 2,750.00 4.07 1.00
7/23/2022 12221 30297 17,430.00 2,750.00 6.34 1.00
7/23/2022 12222 30275 19,610.00 2,750.00 7.13 1.00
7/23/2022 12223 30366 18,750.00 2,750.00 6.82 1.00
7/23/2022 12224 30297 17,320.00 2,750.00 6.30 1.00
7/23/2022 12225 30296 17,220.00 2,750.00 6.26 1.00
7/23/2022 12226 30243 21,740.00 2,750.00 7.91 1.00
7/23/2022 12227 30184 7,930.00 2,750.00 2.88 1.00
7/23/2022 12228 30298 11,150.00 2,750.00 4.05 1.00
7/23/2022 12229 30807 1,490.00 2,750.00 0.54 1.00
7/23/2022 12230 30373 16,870.00 2,750.00 6.13 1.00
7/23/2022 12231 30493 13,020.00 2,750.00 4.73 1.00
7/23/2022 12232 30448 14,060.00 2,750.00 5.11 1.00
7/23/2022 12233 30817 14,790.00 2,750.00 5.38 1.00
7/23/2022 12234 30364 16,620.00 2,750.00 6.04 1.00
7/23/2022 12235 30303 17,040.00 2,750.00 6.20 1.00
7/23/2022 12236 30300 19,970.00 2,750.00 7.26 1.00
7/23/2022 12237 30106 15,230.00 2,750.00 5.54 1.00
7/23/2022 12238 30438 12,680.00 2,750.00 4.61 1.00
7/23/2022 12239 30275 19,580.00 2,750.00 7.12 1.00
7/23/2022 12240 30133 7,890.00 2,750.00 2.87 1.00
7/23/2022 12241 30274 14,970.00 2,750.00 5.44 1.00
7/23/2022 12242 30360 20,190.00 2,750.00 7.34 1.00
7/23/2022 12243 30297 15,860.00 2,750.00 5.77 1.00
7/23/2022 12244 30296 15,820.00 2,750.00 5.75 1.00
7/23/2022 12245 30373 16,520.00 2,750.00 6.01 1.00
7/23/2022 12246 30366 17,300.00 2,750.00 6.29 1.00
7/23/2022 12247 30448 14,620.00 2,750.00 5.32 1.00
7/23/2022 12248 30807 16,020.00 2,750.00 5.83 1.00
7/23/2022 12249 30294 10,040.00 2,750.00 3.65 1.00
7/23/2022 12250 30493 8,890.00 2,750.00 3.23 1.00
7/23/2022 12251 30243 22,080.00 2,750.00 8.03 1.00
7/23/2022 12252 30106 12,250.00 2,750.00 4.45 1.00
7/23/2022 12253 30438 12,130.00 2,750.00 4.41 1.00
7/23/2022 12254 30273 20,910.00 2,750.00 7.60 1.00
7/23/2022 12255 30817 14,080.00 2,750.00 5.12 1.00
7/23/2022 12256 30300 16,790.00 2,750.00 6.11 1.00
7/23/2022 12257 30303 15,700.00 2,750.00 5.71 1.00
7/23/2022 12258 30184 10,170.00 2,750.00 3.70 1.00
7/23/2022 12259 30275 20,490.00 2,750.00 7.45 1.00
7/23/2022 12260 30299 17,930.00 2,750.00 6.52 1.00
7/23/2022 12261 2,750.00 0.00 1.00
7/23/2022 12262 30373 13,740.00 2,750.00 5.00 1.00
7/23/2022 12263 30448 16,030.00 2,750.00 5.83 1.00
7/23/2022 12264 30297 16,240.00 2,750.00 5.91 1.00
7/23/2022 12265 30364 13,120.00 2,750.00 4.77 1.00
7/23/2022 12266 30274 18,580.00 2,750.00 6.76 1.00
7/23/2022 12267 30807 17,610.00 2,750.00 6.40 1.00
7/23/2022 12268 30438 14,230.00 2,750.00 5.17 1.00
7/23/2022 12269 30493 12,690.00 2,750.00 4.61 1.00
7/23/2022 12270 30360 17,160.00 2,750.00 6.24 1.00
7/23/2022 12271 30366 17,330.00 2,750.00 6.30 1.00
7/23/2022 12272 30296 17,430.00 2,750.00 6.34 1.00
7/23/2022 12273 30106 10,330.00 2,750.00 3.76 1.00
7/23/2022 12274 30448 15,350.00 2,750.00 5.58 1.00
7/23/2022 12275 30294 14,010.00 2,750.00 5.09 1.00
7/23/2022 12276 30483 19,680.00 2,750.00 7.16 1.00
7/23/2022 12277 30243 18,910.00 2,750.00 6.88 1.00
7/23/2022 12278 30365 19,180.00 2,750.00 6.97 1.00
7/23/2022 12279 30303 14,600.00 2,750.00 5.31 1.00
7/23/2022 12280 30275 18,690.00 2,750.00 6.80 1.00
7/23/2022 12281 30164 12,440.00 2,750.00 4.52 1.00
7/23/2022 12282 30807 13,830.00 2,750.00 5.03 1.00
7/23/2022 12283 30364 18,110.00 2,750.00 6.59 1.00
7/23/2022 12284 30299 16,940.00 2,750.00 6.16 1.00
7/23/2022 12285 30297 15,750.00 2,750.00 5.73 1.00
7/23/2022 12286 30133 8,880.00 2,750.00 3.23 1.00
7/23/2022 12287 30438 13,920.00 2,750.00 5.06 1.00
7/23/2022 12288 30493 12,360.00 2,750.00 4.49 1.00
TOTALES 1,203,270.00 220,000.00 437.54 80.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 193 30-193


Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 298 30-298
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 817 30-817
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 817 30-817
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 483 30-483
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/24/2022 12289 30364 15,400.00 2,750.00 5.60 1.00
7/24/2022 12290 30366 16,620.00 2,750.00 6.04 1.00
7/24/2022 12291 30133 9,770.00 2,750.00 3.55 1.00
7/24/2022 12292 30184 9,790.00 2,750.00 3.56 1.00
7/24/2022 12293 30294 13,490.00 2,750.00 4.91 1.00
7/24/2022 12294 30360 18,980.00 2,750.00 6.90 1.00
7/24/2022 12295 30303 13,780.00 2,750.00 5.01 1.00
7/24/2022 12296 30273 18,730.00 2,750.00 6.81 1.00
7/24/2022 12297 30275 17,400.00 2,750.00 6.33 1.00
7/24/2022 12298 30299 18,410.00 2,750.00 6.69 1.00
7/24/2022 12299 30296 16,990.00 2,750.00 6.18 1.00
7/24/2022 12300 30243 21,790.00 2,750.00 7.92 1.00
7/24/2022 12301 30274 19,900.00 2,750.00 7.24 1.00
7/24/2022 12302 30297 18,330.00 2,750.00 6.67 1.00
7/24/2022 12303 30364 17,580.00 2,750.00 6.39 1.00
7/24/2022 12304 30300 18,570.00 2,750.00 6.75 1.00
7/24/2022 12305 30366 18,540.00 2,750.00 6.74 1.00
7/24/2022 12306 30303 15,610.00 2,750.00 5.68 1.00
7/24/2022 12307 30360 20,910.00 2,750.00 7.60 1.00
7/24/2022 12308 30184 9,000.00 2,750.00 3.27 1.00
7/24/2022 12309 30365 18,200.00 2,750.00 6.62 1.00
7/24/2022 12310 30275 19,130.00 2,750.00 6.96 1.00
7/24/2022 12311 30273 19,360.00 2,750.00 7.04 1.00
7/24/2022 12312 30294 13,350.00 2,750.00 4.85 1.00
7/24/2022 12313 30133 10,240.00 2,750.00 3.72 1.00
7/24/2022 12314 30296 17,620.00 2,750.00 6.41 1.00
7/24/2022 12315 30243 18,300.00 2,750.00 6.65 1.00
7/24/2022 12316 30299 16,710.00 2,750.00 6.08 1.00
7/24/2022 12317 30562 13,270.00 2,750.00 4.83 1.00
7/24/2022 12318 30274 23,100.00 2,750.00 8.40 1.00
7/24/2022 12319 30365 17,970.00 2,750.00 6.53 1.00
7/24/2022 12320 30303 16,310.00 2,750.00 5.93 1.00
7/24/2022 12321 30300 20,510.00 2,750.00 7.46 1.00
7/24/2022 12322 30360 16,470.00 2,750.00 5.99 1.00
7/24/2022 12323 30184 10,540.00 2,750.00 3.83 1.00
7/24/2022 12324 30296 15,020.00 2,750.00 5.46 1.00
7/24/2022 12325 30297 21,610.00 2,750.00 7.86 1.00
7/24/2022 12326 30299 15,480.00 2,750.00 5.63 1.00
7/24/2022 12327 30243 20,350.00 2,750.00 7.40 1.00
7/24/2022 12328 30275 16,970.00 2,750.00 6.17 1.00
7/24/2022 12329 30365 16,610.00 2,750.00 6.04 1.00
7/24/2022 12330 30364 16,040.00 2,750.00 5.83 1.00
7/24/2022 12331 30273 19,180.00 2,750.00 6.97 1.00
7/24/2022 12332 30274 18,170.00 2,750.00 6.61 1.00
7/24/2022 12333 30366 19,330.00 2,750.00 7.03 1.00
7/24/2022 12334 30303 16,300.00 2,750.00 5.93 1.00
7/24/2022 12335 30562 14,590.00 2,750.00 5.31 1.00
7/24/2022 12336 30817 10,890.00 2,750.00 3.96 1.00
7/24/2022 12337 30300 16,070.00 2,750.00 5.84 1.00
7/24/2022 12338 30294 23,460.00 2,750.00 8.53 1.00
7/24/2022 12339 30360 15,840.00 2,750.00 5.76 1.00
TOTALES 856,580.00 140,250.00 311.47 51.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 364 30-364


Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 133 30-133
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 817 30-817
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/24/2022 12340 30364 11,930.00 2,750.00 4.34 1.00
7/24/2022 12341 30299 15,440.00 2,750.00 5.61 1.00
7/24/2022 12342 30300 17,490.00 2,750.00 6.36 1.00
7/24/2022 12343 30360 16,190.00 2,750.00 5.89 1.00
7/24/2022 12344 30365 16,700.00 2,750.00 6.07 1.00
7/24/2022 12345 30360 17,290.00 2,750.00 6.29 1.00
7/24/2022 12346 30106 12,030.00 2,750.00 4.37 1.00
7/24/2022 12347 30184 10,790.00 2,750.00 3.92 1.00
7/24/2022 12348 30296 15,630.00 2,750.00 5.68 1.00
7/24/2022 12349 30275 16,520.00 2,750.00 6.01 1.00
7/24/2022 12350 30364 14,180.00 2,750.00 5.16 1.00
7/24/2022 12351 30274 11,920.00 2,750.00 4.33 1.00
7/24/2022 12352 30297 17,110.00 2,750.00 6.22 1.00
7/24/2022 12353 30365 14,270.00 2,750.00 5.19 1.00
7/24/2022 12354 30807 15,930.00 2,750.00 5.79 1.00
7/24/2022 12355 30373 19,310.00 2,750.00 7.02 1.00
7/24/2022 12356 30106 14,600.00 2,750.00 5.31 1.00
7/24/2022 12357 30184 11,810.00 2,750.00 4.29 1.00
7/24/2022 12358 30300 17,320.00 2,750.00 6.30 1.00
7/24/2022 12359 30562 15,740.00 2,750.00 5.72 1.00
7/24/2022 12360 30299 14,770.00 2,750.00 5.37 1.00
7/24/2022 12361 30493 12,020.00 2,750.00 4.37 1.00
7/24/2022 12362 30164 15,070.00 2,750.00 5.48 1.00
7/24/2022 12363 30144 13,670.00 2,750.00 4.97 1.00
7/24/2022 12364 30335 12,970.00 2,750.00 4.72 1.00
7/24/2022 12365 30296 17,050.00 2,750.00 6.20 1.00
7/24/2022 12366 30275 16,170.00 2,750.00 5.88 1.00
7/24/2022 12367 30364 10,620.00 2,750.00 3.86 1.00
7/24/2022 12368 30153 15,650.00 2,750.00 5.69 1.00
7/24/2022 12369 30274 21,240.00 2,750.00 7.72 1.00
7/24/2022 12370 30273 18,530.00 2,750.00 6.74 1.00
7/24/2022 12371 30365 21,040.00 2,750.00 7.65 1.00
7/24/2022 12372 30300 19,350.00 2,750.00 7.04 1.00
7/24/2022 12373 30445 18,040.00 2,750.00 6.56 1.00
7/24/2022 12374 30807 14,200.00 2,750.00 5.16 1.00
7/24/2022 12375 30360 20,630.00 2,750.00 7.50 1.00
7/24/2022 12376 30297 19,930.00 2,750.00 7.25 1.00
7/24/2022 12377 30373 15,560.00 2,750.00 5.66 1.00
7/24/2022 12378 30448 15,500.00 2,750.00 5.64 1.00
7/24/2022 12379 30106 15,250.00 2,750.00 5.55 1.00
7/24/2022 12380 30366 21,450.00 2,750.00 7.80 1.00
7/24/2022 12381 30243 17,760.00 2,750.00 6.46 1.00
7/24/2022 12382 30364 16,600.00 2,750.00 6.04 1.00
7/24/2022 12383 30296 18,060.00 2,750.00 6.57 1.00
7/24/2022 12384 30275 19,470.00 2,750.00 7.08 1.00
7/24/2022 12385 30299 17,240.00 2,750.00 6.27 1.00
7/24/2022 12386 30153 11,720.00 2,750.00 4.26 1.00
7/24/2022 12387 30365 16,880.00 2,750.00 6.14 1.00
7/24/2022 12388 30274 15,430.00 2,750.00 5.61 1.00
7/24/2022 12389 30300 17,510.00 2,750.00 6.37 1.00
7/24/2022 12390 30273 14,810.00 2,750.00 5.39 1.00
7/24/2022 12391 30297 20,120.00 2,750.00 7.32 1.00
7/24/2022 12392 30562 16,190.00 2,750.00 5.89 1.00
7/24/2022 12393 30360 18,470.00 2,750.00 6.72 1.00
7/24/2022 12394 30303 14,870.00 2,750.00 5.41 1.00
7/24/2022 12395 30294 13,690.00 2,750.00 4.98 1.00
7/24/2022 12396 30275 16,950.00 2,750.00 6.16 1.00
7/24/2022 12397 30243 15,030.00 2,750.00 5.47 1.00
7/24/2022 12398 30364 16,030.00 2,750.00 5.83 1.00
7/24/2022 12399 30153 18,090.00 2,750.00 6.58 1.00
7/24/2022 12400 30365 16,860.00 2,750.00 6.13 1.00
7/24/2022 12401 30366 20,240.00 2,750.00 7.36 1.00
7/24/2022 12402 30299 16,930.00 2,750.00 6.16 1.00
7/24/2022 12403 30300 17,130.00 2,750.00 6.23 1.00
7/24/2022 12404 30297 17,260.00 2,750.00 6.28 1.00
7/24/2022 12405 30273 14,870.00 2,750.00 5.41 1.00
7/24/2022 12406 30184 9,610.00 2,750.00 3.49 1.00
7/24/2022 12407 30360 18,020.00 2,750.00 6.55 1.00
7/24/2022 12408 30303 15,940.00 2,750.00 5.80 1.00
7/24/2022 12409 30365 20,830.00 2,750.00 7.57 1.00
7/24/2022 12410 30296 14,330.00 2,750.00 5.21 1.00
7/24/2022 12411 30562 15,250.00 2,750.00 5.55 1.00
7/24/2022 12412 30275 15,450.00 2,750.00 5.62 1.00
7/24/2022 12413 30364 15,330.00 2,750.00 5.57 1.00
7/24/2022 12414 30294 14,150.00 2,750.00 5.15 1.00
7/24/2022 12415 30299 18,030.00 2,750.00 6.56 1.00
TOTALES 1,226,060.00 209,000.00 445.87 76.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 364 30-364


Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 335 30-335
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 445 30-445
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/26/2022 12416 30364 19,090.00 2,750.00 6.94 1.00
7/26/2022 12417 30297 22,160.00 2,750.00 8.06 1.00
7/26/2022 12418 30294 15,310.00 2,750.00 5.57 1.00
7/26/2022 12419 30360 19,870.00 2,750.00 7.23 1.00
7/26/2022 12420 30296 20,660.00 2,750.00 7.51 1.00
7/26/2022 12421 30273 20,440.00 2,750.00 7.43 1.00
7/26/2022 12422 30275 22,690.00 2,750.00 8.25 1.00
7/26/2022 12423 30274 16,140.00 2,750.00 5.87 1.00
7/26/2022 12424 30365 18,200.00 2,750.00 6.62 1.00
7/26/2022 12425 30243 20,500.00 2,750.00 7.45 1.00
7/26/2022 12426 30366 19,770.00 2,750.00 7.19 1.00
7/26/2022 12427 30300 18,480.00 2,750.00 6.72 1.00
7/26/2022 12428 30303 16,980.00 2,750.00 6.17 1.00
7/26/2022 12429 30364 17,020.00 2,750.00 6.19 1.00
7/26/2022 12430 30297 20,190.00 2,750.00 7.34 1.00
7/26/2022 12431 30365 18,370.00 2,750.00 6.68 1.00
7/26/2022 12432 30299 21,520.00 2,750.00 7.83 1.00
7/26/2022 12433 30296 13,730.00 2,750.00 4.99 1.00
7/26/2022 12434 30275 17,090.00 2,750.00 6.21 1.00
7/26/2022 12435 30294 17,810.00 2,750.00 6.48 1.00
7/26/2022 12436 30366 22,070.00 2,750.00 8.03 1.00
7/26/2022 12437 30300 15,010.00 2,750.00 5.46 1.00
7/26/2022 12438 30364 15,560.00 2,750.00 5.66 1.00
7/26/2022 12439 30273 16,120.00 2,750.00 5.86 1.00
7/26/2022 12440 30274 16,660.00 2,750.00 6.06 1.00
7/26/2022 12441 30297 20,360.00 2,750.00 7.40 1.00
7/26/2022 12442 30275 20,040.00 2,750.00 7.29 1.00
7/26/2022 12443 30303 17,140.00 2,750.00 6.23 1.00
7/26/2022 12444 30106 14,400.00 2,750.00 5.24 1.00
7/26/2022 12445 30364 11,470.00 2,750.00 4.17 1.00
7/26/2022 12446 30366 16,660.00 2,750.00 6.06 1.00
7/26/2022 12447 30300 18,160.00 2,750.00 6.60 1.00
7/26/2022 12448 30299 18,380.00 2,750.00 6.68 1.00
7/26/2022 12449 30274 20,550.00 2,750.00 7.47 1.00
7/26/2022 12450 30296 12,790.00 2,750.00 4.65 1.00
7/26/2022 12451 30297 18,800.00 2,750.00 6.84 1.00
7/26/2022 12452 30273 16,910.00 2,750.00 6.15 1.00
7/26/2022 12453 30303 16,220.00 2,750.00 5.90 1.00
7/26/2022 12454 30365 15,060.00 2,750.00 5.48 1.00
7/26/2022 12455 30366 17,040.00 2,750.00 6.20 1.00
7/26/2022 12456 2,750.00 0.00 1.00
7/26/2022 12457 30366 17,040.00 2,750.00 6.20 1.00
7/26/2022 12458 30275 17,980.00 2,750.00 6.54 1.00
7/26/2022 12459 30274 17,750.00 2,750.00 6.45 1.00
7/26/2022 12460 30296 15,540.00 2,750.00 5.65 1.00
7/26/2022 12461 30365 19,240.00 2,750.00 7.00 1.00
7/26/2022 12462 30297 19,330.00 2,750.00 7.03 1.00
7/26/2022 12463 30303 16,070.00 2,750.00 5.84 1.00
7/26/2022 12464 30300 22,110.00 2,750.00 8.04 1.00
7/26/2022 12465 30273 18,210.00 2,750.00 6.62 1.00
7/26/2022 12466 30562 15,460.00 2,750.00 5.62 1.00
7/26/2022 12467 30364 16,650.00 2,750.00 6.05 1.00
7/26/2022 12468 30366 18,080.00 2,750.00 6.57 1.00
7/26/2022 12469 30184 5,030.00 2,750.00 1.83 1.00
7/26/2022 12470 30299 16,030.00 2,750.00 5.83 1.00
7/26/2022 12471 30275 19,440.00 2,750.00 7.07 1.00
7/26/2022 12472 30365 16,680.00 2,750.00 6.07 1.00
7/26/2022 12473 30273 17,230.00 2,750.00 6.27 1.00
7/26/2022 12474 30364 15,510.00 2,750.00 5.64 1.00
7/26/2022 12475 30297 20,510.00 2,750.00 7.46 1.00
7/26/2022 12476 30296 18,420.00 2,750.00 6.70 1.00
7/26/2022 12477 30300 17,920.00 2,750.00 6.52 1.00
7/26/2022 12478 30303 16,320.00 2,750.00 5.93 1.00
7/26/2022 12479 30274 16,000.00 2,750.00 5.82 1.00
7/26/2022 12480 30562 17,020.00 2,750.00 6.19 1.00
7/26/2022 12481 30299 20,490.00 2,750.00 7.45 1.00
TOTALES 1,145,480.00 181,500.00 416.55 66.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 364 30-364


Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/27/2022 12482 30360 18,430.00 2,750.00 6.70 1.00
7/27/2022 12483 30364 14,820.00 2,750.00 5.39 1.00
7/27/2022 12484 30303 13,960.00 2,750.00 5.08 1.00
7/27/2022 12485 30300 16,960.00 2,750.00 6.17 1.00
7/27/2022 12486 30275 14,260.00 2,750.00 5.19 1.00
7/27/2022 12487 30299 17,070.00 2,750.00 6.21 1.00
7/27/2022 12488 30366 19,260.00 2,750.00 7.00 1.00
7/27/2022 12489 30365 17,670.00 2,750.00 6.43 1.00
7/27/2022 12490 30296 15,780.00 2,750.00 5.74 1.00
7/27/2022 12491 30274 19,830.00 2,750.00 7.21 1.00
7/27/2022 12492 30274 19,830.00 2,750.00 7.21 1.00
7/27/2022 12493 30297 18,130.00 2,750.00 6.59 1.00
7/27/2022 12494 30360 17,770.00 2,750.00 6.46 1.00
7/27/2022 12495 30364 18,770.00 2,750.00 6.83 1.00
7/27/2022 12496 30366 17,230.00 2,750.00 6.27 1.00
7/27/2022 12497 30275 15,710.00 2,750.00 5.71 1.00
7/27/2022 12498 30303 15,710.00 2,750.00 5.71 1.00
7/27/2022 12499 30299 17,620.00 2,750.00 6.41 1.00
7/27/2022 12500 30363 18,560.00 2,750.00 6.75 1.00
7/27/2022 12501 30296 10,950.00 2,750.00 3.98 1.00
7/27/2022 12502 30273 18,370.00 2,750.00 6.68 1.00
7/27/2022 12503 30274 20,130.00 2,750.00 7.32 1.00
7/27/2022 12504 30364 17,890.00 2,750.00 6.51 1.00
7/27/2022 12505 30297 19,700.00 2,750.00 7.16 1.00
7/27/2022 12506 30360 16,100.00 2,750.00 5.85 1.00
7/27/2022 12507 30184 16,260.00 2,750.00 5.91 1.00
7/27/2022 12508 30275 16,190.00 2,750.00 5.89 1.00
7/27/2022 12509 30296 10,140.00 2,750.00 3.69 1.00
7/27/2022 12510 30299 13,070.00 2,750.00 4.75 1.00
7/27/2022 12511 30364 22,030.00 2,750.00 8.01 1.00
7/27/2022 12512 30365 17,270.00 2,750.00 6.28 1.00
7/27/2022 12513 30273 17,520.00 2,750.00 6.37 1.00
7/27/2022 12514 30365 19,710.00 2,750.00 7.17 1.00
7/27/2022 12515 30296 18,450.00 2,750.00 6.71 1.00
7/27/2022 12516 30274 16,810.00 2,750.00 6.11 1.00
7/27/2022 12517 30360 17,200.00 2,750.00 6.25 1.00
7/27/2022 12518 30180 10,220.00 2,750.00 3.72 1.00
7/27/2022 12519 30300 18,640.00 2,750.00 6.78 1.00
7/27/2022 12520 30297 17,750.00 2,750.00 6.45 1.00
7/27/2022 12521 30243 16,810.00 2,750.00 6.11 1.00
7/27/2022 12522 30562 18,180.00 2,750.00 6.61 1.00
7/27/2022 12523 30275 16,530.00 2,750.00 6.01 1.00
7/27/2022 12524 30299 16,250.00 2,750.00 5.91 1.00
7/27/2022 12525 30364 20,750.00 2,750.00 7.55 1.00
7/27/2022 12526 30365 15,890.00 2,750.00 5.78 1.00
7/27/2022 12527 30303 13,660.00 2,750.00 4.97 1.00
7/27/2022 12528 30173 14,660.00 2,750.00 5.33 1.00
7/27/2022 12529 30296 12,650.00 2,750.00 4.60 1.00
7/27/2022 12530 30360 20,030.00 2,750.00 7.28 1.00
7/27/2022 12531 30273 17,020.00 2,750.00 6.19 1.00
7/27/2022 12532 30184 8,520.00 2,750.00 3.10 1.00
7/27/2022 12533 30300 18,110.00 2,750.00 6.59 1.00
7/27/2022 12534 30297 18,740.00 2,750.00 6.81 1.00
7/27/2022 12535 30243 14,160.00 2,750.00 5.15 1.00
7/27/2022 12536 30562 13,430.00 2,750.00 4.88 1.00
7/27/2022 12537 30364 19,490.00 2,750.00 7.09 1.00
7/27/2022 12538 30275 15,600.00 2,750.00 5.67 1.00
7/27/2022 12539 30299 13,650.00 2,750.00 4.96 1.00
7/27/2022 12540 30365 19,970.00 2,750.00 7.26 1.00
7/27/2022 12541 30303 17,080.00 2,750.00 6.21 1.00
7/27/2022 12542 30274 16,020.00 2,750.00 5.83 1.00
7/27/2022 12543 30296 15,050.00 2,750.00 5.47 1.00
7/27/2022 12544 30273 16,020.00 2,750.00 5.83 1.00
7/27/2022 12545 30243 17,020.00 2,750.00 6.19 1.00
7/27/2022 12546 30184 6,300.00 2,750.00 2.29 1.00
7/27/2022 12547 30297 18,700.00 2,750.00 6.80 1.00
7/27/2022 12548 30300 15,800.00 2,750.00 5.75 1.00
7/27/2022 12549 30297 18,700.00 2,750.00 6.80 1.00
7/27/2022 12550 30360 200.00 2,750.00 0.07 1.00
7/27/2022 12551 30562 15,280.00 2,750.00 5.56 1.00
7/27/2022 12552 30365 14,420.00 2,750.00 5.24 1.00
7/27/2022 12553 30364 17,760.00 2,750.00 6.46 1.00
7/27/2022 12554 30275 16,400.00 2,750.00 5.96 1.00
7/27/2022 12555 30303 14,990.00 2,750.00 5.45 1.00
7/27/2022 12556 30173 15,640.00 2,750.00 5.69 1.00
7/27/2022 12557 30273 15,430.00 2,750.00 5.61 1.00
7/27/2022 12558 30274 14,430.00 2,750.00 5.25 1.00
7/27/2022 12559 30296 16,590.00 2,750.00 6.03 1.00
7/27/2022 12560 30243 16,620.00 2,750.00 6.04 1.00
TOTALES 1,284,320.00 217,250.00 467.03 79.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 360 30-360


Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 363 30-363
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 180 30-180
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 173 30-173
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 173 30-173
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/28/2022 12561 30562 15,400.00 2,750.00 5.60 1.00
7/28/2022 12562 30303 14,360.00 2,750.00 5.22 1.00
7/28/2022 12563 30275 12,760.00 2,750.00 4.64 1.00
7/28/2022 12564 30300 17,260.00 2,750.00 6.28 1.00
7/28/2022 12565 30366 21,250.00 2,750.00 7.73 1.00
7/28/2022 12566 30365 15,990.00 2,750.00 5.81 1.00
7/28/2022 12567 30299 16,990.00 2,750.00 6.18 1.00
7/28/2022 12568 30296 20,460.00 2,750.00 7.44 1.00
7/28/2022 12569 30184 11,400.00 2,750.00 4.15 1.00
7/28/2022 12570 30273 11,430.00 2,750.00 4.16 1.00
7/28/2022 12571 30294 18,740.00 2,750.00 6.81 1.00
7/28/2022 12572 30360 17,890.00 2,750.00 6.51 1.00
7/28/2022 12573 30303 14,890.00 2,750.00 5.41 1.00
7/28/2022 12574 30366 18,600.00 2,750.00 6.76 1.00
7/28/2022 12575 30300 10,710.00 2,750.00 3.89 1.00
7/28/2022 12576 30365 19,790.00 2,750.00 7.20 1.00
7/28/2022 12577 30275 18,960.00 2,750.00 6.89 1.00
7/28/2022 12578 30296 18,120.00 2,750.00 6.59 1.00
7/28/2022 12579 30273 17,720.00 2,750.00 6.44 1.00
7/28/2022 12580 30184 12,490.00 2,750.00 4.54 1.00
7/28/2022 12581 30299 20,430.00 2,750.00 7.43 1.00
7/28/2022 12582 30243 24,010.00 2,750.00 8.73 1.00
7/28/2022 12583 30294 15,580.00 2,750.00 5.67 1.00
7/28/2022 12584 30300 15,370.00 2,750.00 5.59 1.00
7/28/2022 12585 30360 15,990.00 2,750.00 5.81 1.00
7/28/2022 12586 30366 16,200.00 2,750.00 5.89 1.00
7/28/2022 12587 30303 17,810.00 2,750.00 6.48 1.00
7/28/2022 12588 30365 16,810.00 2,750.00 6.11 1.00
7/28/2022 12589 30299 17,490.00 2,750.00 6.36 1.00
7/28/2022 12590 30275 19,000.00 2,750.00 6.91 1.00
7/28/2022 12591 30562 15,350.00 2,750.00 5.58 1.00
7/28/2022 12592 30297 20,330.00 2,750.00 7.39 1.00
7/28/2022 12593 30274 18,320.00 2,750.00 6.66 1.00
7/28/2022 12594 30273 16,310.00 2,750.00 5.93 1.00
7/28/2022 12595 30294 16,410.00 2,750.00 5.97 1.00
7/28/2022 12596 30243 18,150.00 2,750.00 6.60 1.00
7/28/2022 12597 30303 18,030.00 2,750.00 6.56 1.00
7/28/2022 12598 30562 15,910.00 2,750.00 5.79 1.00
7/28/2022 12599 30299 17,770.00 2,750.00 6.46 1.00
7/28/2022 12600 30184 9,910.00 2,750.00 3.60 1.00
7/28/2022 12601 30365 23,300.00 2,750.00 8.47 1.00
7/28/2022 12602 30243 17,300.00 2,750.00 6.29 1.00
7/28/2022 12603 30294 16,780.00 2,750.00 6.10 1.00
7/28/2022 12604 30300 16,900.00 2,750.00 6.15 1.00
7/28/2022 12605 30274 19,170.00 2,750.00 6.97 1.00
7/28/2022 12606 30303 16,450.00 2,750.00 5.98 1.00
7/28/2022 12607 30562 16,290.00 2,750.00 5.92 1.00
7/28/2022 12608 30184 18,180.00 2,750.00 6.61 1.00
7/28/2022 12609 30299 16,000.00 2,750.00 5.82 1.00
7/28/2022 12610 30365 17,760.00 2,750.00 6.46 1.00
7/28/2022 12611 30275 16,350.00 2,750.00 5.95 1.00
7/28/2022 12612 30243 19,950.00 2,750.00 7.25 1.00
7/28/2022 12613 30294 14,360.00 2,750.00 5.22 1.00
7/28/2022 12614 30273 16,480.00 2,750.00 5.99 1.00
7/28/2022 12615 30300 15,630.00 2,750.00 5.68 1.00
7/28/2022 12616 30303 16,400.00 2,750.00 5.96 1.00
7/28/2022 12617 30365 20,540.00 2,750.00 7.47 1.00
7/28/2022 12618 30299 18,620.00 2,750.00 6.77 1.00
7/28/2022 12619 30360 19,190.00 2,750.00 6.98 1.00
7/28/2022 12620 30243 14,470.00 2,750.00 5.26 1.00
7/28/2022 12621 30294 15,150.00 2,750.00 5.51 1.00
TOTALES 1,035,660.00 167,750.00 376.58 61.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 562 30-562


Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/29/2022 12622 30303 14,230.00 2,750.00 5.17 1.00
7/29/2022 12623 30562 15,660.00 2,750.00 5.69 1.00
7/29/2022 12624 30300 18,310.00 2,750.00 6.66 1.00
7/29/2022 12625 30273 18,870.00 2,750.00 6.86 1.00
7/29/2022 12626 30366 18,200.00 2,750.00 6.62 1.00
7/29/2022 12627 30294 15,870.00 2,750.00 5.77 1.00
7/29/2022 12628 30296 18,130.00 2,750.00 6.59 1.00
7/29/2022 12629 30365 19,440.00 2,750.00 7.07 1.00
7/29/2022 12630 30299 20,610.00 2,750.00 7.49 1.00
7/29/2022 12631 30243 13,410.00 2,750.00 4.88 1.00
7/29/2022 12632 30300 13,260.00 2,750.00 4.82 1.00
7/29/2022 12633 30303 17,350.00 2,750.00 6.31 1.00
7/29/2022 12634 30273 18,470.00 2,750.00 6.72 1.00
7/29/2022 12635 30275 20,570.00 2,750.00 7.48 1.00
7/29/2022 12636 30296 17,500.00 2,750.00 6.36 1.00
7/29/2022 12637 30296 17,500.00 2,750.00 6.36 1.00
7/29/2022 12638 30365 17,830.00 2,750.00 6.48 1.00
7/29/2022 12639 30243 21,370.00 2,750.00 7.77 1.00
7/29/2022 12640 30299 17,990.00 2,750.00 6.54 1.00
TOTALES 334,570.00 52,250.00 121.64 19.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 303 30-303


Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/30/2022 12641 30303 18,280.00 2,750.00 6.65 1.00
7/30/2022 12642 30294 17,640.00 2,750.00 6.41 1.00
7/30/2022 12643 30300 19,100.00 2,750.00 6.95 1.00
7/30/2022 12644 30296 16,240.00 2,750.00 5.91 1.00
7/30/2022 12645 30273 18,740.00 2,750.00 6.81 1.00
7/30/2022 12646 30275 11,460.00 2,750.00 4.17 1.00
7/30/2022 12647 30299 17,280.00 2,750.00 6.28 1.00
7/30/2022 12648 30243 15,380.00 2,750.00 5.59 1.00
7/30/2022 12649 30294 16,190.00 2,750.00 5.89 1.00
7/30/2022 12650 30303 17,070.00 2,750.00 6.21 1.00
7/30/2022 12651 30300 18,440.00 2,750.00 6.71 1.00
7/30/2022 12652 30296 15,690.00 2,750.00 5.71 1.00
7/30/2022 12653 30273 14,240.00 2,750.00 5.18 1.00
7/30/2022 12654 30275 18,380.00 2,750.00 6.68 1.00
7/30/2022 12655 30360 31,130.00 2,750.00 11.32 1.00
7/30/2022 12656 30562 15,490.00 2,750.00 5.63 1.00
7/30/2022 12657 30299 13,890.00 2,750.00 5.05 1.00
7/30/2022 12658 30297 13,550.00 2,750.00 4.93 1.00
7/30/2022 12659 30364 20,260.00 2,750.00 7.37 1.00
7/30/2022 12660 30445 13,550.00 2,750.00 4.93 1.00
7/30/2022 12661 30300 15,290.00 2,750.00 5.56 1.00
7/30/2022 12662 3096 17,360.00 2,750.00 6.31 1.00
7/30/2022 12663 30303 19,520.00 2,750.00 7.10 1.00
7/30/2022 12664 30274 18,260.00 2,750.00 6.64 1.00
7/30/2022 12665 30125 25,270.00 2,750.00 9.19 1.00
7/30/2022 12666 30275 16,170.00 2,750.00 5.88 1.00
7/30/2022 12667 30373 16,730.00 2,750.00 6.08 1.00
7/30/2022 12668 30243 19,830.00 2,750.00 7.21 1.00
7/30/2022 12669 30294 13,980.00 2,750.00 5.08 1.00
7/30/2022 12670 30273 16,680.00 2,750.00 6.07 1.00
7/30/2022 12671 30493 13,320.00 2,750.00 4.84 1.00
7/30/2022 12672 30366 18,740.00 2,750.00 6.81 1.00
7/30/2022 12673 30153 14,280.00 2,750.00 5.19 1.00
7/30/2022 12674 30297 20,880.00 2,750.00 7.59 1.00
7/30/2022 12675 30299 16,480.00 2,750.00 5.99 1.00
7/30/2022 12676 30562 17,950.00 2,750.00 6.53 1.00
7/30/2022 12677 30300 15,410.00 2,750.00 5.60 1.00
7/30/2022 12678 30364 18,240.00 2,750.00 6.63 1.00
7/30/2022 12679 30483 12,070.00 2,750.00 4.39 1.00
7/30/2022 12680 30445 18,260.00 2,750.00 6.64 1.00
7/30/2022 12681 30360 17,070.00 2,750.00 6.21 1.00
7/30/2022 12682 30303 14,610.00 2,750.00 5.31 1.00
7/30/2022 12683 30296 14,450.00 2,750.00 5.25 1.00
7/30/2022 12684 30274 20,810.00 2,750.00 7.57 1.00
7/30/2022 12685 30144 16,190.00 2,750.00 5.89 1.00
7/30/2022 12686 30164 12,180.00 2,750.00 4.43 1.00
7/30/2022 12687 30184 11,770.00 2,750.00 4.28 1.00
7/30/2022 12688 30122 21,090.00 2,750.00 7.67 1.00
7/30/2022 12689 30275 18,860.00 2,750.00 6.86 1.00
7/30/2022 12690 2,750.00 0.00 1.00
7/30/2022 12691 30366 19,590.00 2,750.00 7.12 1.00
7/30/2022 12692 30243 20,620.00 2,750.00 7.50 1.00
7/30/2022 12693 30810 15,710.00 2,750.00 5.71 1.00
7/30/2022 12694 30153 13,060.00 2,750.00 4.75 1.00
7/30/2022 12695 30493 8,820.00 2,750.00 3.21 1.00
7/30/2022 12696 30273 16,800.00 2,750.00 6.11 1.00
7/30/2022 12697 30297 18,670.00 2,750.00 6.79 1.00
7/30/2022 12698 30294 16,190.00 2,750.00 5.89 1.00
7/30/2022 12699 30106 15,070.00 2,750.00 5.48 1.00
7/30/2022 12700 30300 19,490.00 2,750.00 7.09 1.00
7/30/2022 12701 30364 14,260.00 2,750.00 5.19 1.00
7/30/2022 12702 30299 8,560.00 2,750.00 3.11 1.00
7/30/2022 12703 30562 19,050.00 2,750.00 6.93 1.00
7/30/2022 12704 30483 15,590.00 2,750.00 5.67 1.00
TOTALES 1,055,230.00 176,000.00 383.73 64.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 303 30-303


Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 445 30-445
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 96 30-96
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 125 30-125
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 483 30-483
Bolon CAMBIO LINEA WAWA 30 - 445 30-445
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 122 30-122
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 810 30-810
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
7/31/2022 12705 30300 17,610.00 2,750.00 6.40 1.00
7/31/2022 12706 30366 18,060.00 2,750.00 6.57 1.00
7/31/2022 12707 30303 17,230.00 2,750.00 6.27 1.00
7/31/2022 12708 30273 17,980.00 2,750.00 6.54 1.00
7/31/2022 12709 30364 20,360.00 2,750.00 7.40 1.00
7/31/2022 12710 30360 21,150.00 2,750.00 7.69 1.00
7/31/2022 12711 30297 18,480.00 2,750.00 6.72 1.00
7/31/2022 12712 30294 11,800.00 2,750.00 4.29 1.00
7/31/2022 12713 30296 17,040.00 2,750.00 6.20 1.00
7/31/2022 12714 30184 11,820.00 2,750.00 4.30 1.00
7/31/2022 12715 30299 15,620.00 2,750.00 5.68 1.00
7/31/2022 12716 30275 17,960.00 2,750.00 6.53 1.00
7/31/2022 12717 30243 17,810.00 2,750.00 6.48 1.00
7/31/2022 12718 30300 16,110.00 2,750.00 5.86 1.00
7/31/2022 12719 30303 16,600.00 2,750.00 6.04 1.00
7/31/2022 12720 30562 18,490.00 2,750.00 6.72 1.00
7/31/2022 12721 30366 20,100.00 2,750.00 7.31 1.00
7/31/2022 12722 30364 16,550.00 2,750.00 6.02 1.00
7/31/2022 12723 30273 13,180.00 2,750.00 4.79 1.00
7/31/2022 12724 30296 15,670.00 2,750.00 5.70 1.00
7/31/2022 12725 30360 14,020.00 2,750.00 5.10 1.00
7/31/2022 12726 30297 21,010.00 2,750.00 7.64 1.00
7/31/2022 12727 30294 13,290.00 2,750.00 4.83 1.00
7/31/2022 12728 30364 19,070.00 2,750.00 6.93 1.00
7/31/2022 12729 30275 17,630.00 2,750.00 6.41 1.00
7/31/2022 12730 30366 19,750.00 2,750.00 7.18 1.00
7/31/2022 12731 30300 14,950.00 2,750.00 5.44 1.00
7/31/2022 12732 30299 13,560.00 2,750.00 4.93 1.00
7/31/2022 12733 30274 18,070.00 2,750.00 6.57 1.00
7/31/2022 12734 30294 13,100.00 2,750.00 4.76 1.00
7/31/2022 12735 30296 15,660.00 2,750.00 5.69 1.00
7/31/2022 12736 30273 13,460.00 2,750.00 4.89 1.00
7/31/2022 12737 30360 14,920.00 2,750.00 5.43 1.00
7/31/2022 12738 30562 16,990.00 2,750.00 6.18 1.00
7/31/2022 12739 30275 16,810.00 2,750.00 6.11 1.00
7/31/2022 12740 30303 15,750.00 2,750.00 5.73 1.00
7/31/2022 12741 30300 18,420.00 2,750.00 6.70 1.00
7/31/2022 12742 30493 10,980.00 2,750.00 3.99 1.00
7/31/2022 12743 30184 10,480.00 2,750.00 3.81 1.00
7/31/2022 12744 30299 18,750.00 2,750.00 6.82 1.00
7/31/2022 12745 30448 14,170.00 2,750.00 5.15 1.00
7/31/2022 12746 30274 21,700.00 2,750.00 7.89 1.00
7/31/2022 12747 30366 17,220.00 2,750.00 6.26 1.00
7/31/2022 12748 30297 19,710.00 2,750.00 7.17 1.00
7/31/2022 12749 30296 13,910.00 2,750.00 5.06 1.00
7/31/2022 12750 30373 16,050.00 2,750.00 5.84 1.00
7/31/2022 12751 30243 22,240.00 2,750.00 8.09 1.00
7/31/2022 12752 30122 12,150.00 2,750.00 4.42 1.00
TOTALES 793,440.00 132,000.00 288.53 48.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 300 30-300


Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 122 30-122
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
8/1/2022 12754 30364 13,520.00 2,750.00 4.92 1.00
8/1/2022 12755 30358 17,570.00 2,750.00 6.39 1.00
8/1/2022 12756 30273 15,850.00 2,750.00 5.76 1.00
8/1/2022 12757 30360 19,100.00 2,750.00 6.95 1.00
8/1/2022 12758 30274 20,350.00 2,750.00 7.40 1.00
8/1/2022 12759 30300 18,510.00 2,750.00 6.73 1.00
8/1/2022 12760 30275 15,800.00 2,750.00 5.75 1.00
8/1/2022 12761 30296 17,710.00 2,750.00 6.44 1.00
8/1/2022 12762 30294 12,940.00 2,750.00 4.71 1.00
8/1/2022 12763 30299 15,190.00 2,750.00 5.52 1.00
8/1/2022 12764 30303 16,360.00 2,750.00 5.95 1.00
8/1/2022 12765 30243 13,500.00 2,750.00 4.91 1.00
8/1/2022 12766 30366 20,100.00 2,750.00 7.31 1.00
8/1/2022 12767 30562 14,410.00 2,750.00 5.24 1.00
8/1/2022 12768 30297 12,590.00 2,750.00 4.58 1.00
8/1/2022 12769 30164 12,500.00 2,750.00 4.55 1.00
8/1/2022 12770 30364 19,330.00 2,750.00 7.03 1.00
8/1/2022 12771 30358 18,970.00 2,750.00 6.90 1.00
8/1/2022 12772 30300 18,020.00 2,750.00 6.55 1.00
8/1/2022 12773 30296 17,630.00 2,750.00 6.41 1.00
8/1/2022 12774 30273 15,650.00 2,750.00 5.69 1.00
8/1/2022 12775 30275 20,300.00 2,750.00 7.38 1.00
8/1/2022 12776 30360 19,600.00 2,750.00 7.13 1.00
8/1/2022 12777 30125 18,400.00 2,750.00 6.69 1.00
8/1/2022 12778 30810 19,990.00 2,750.00 7.27 1.00
8/1/2022 12779 30294 14,070.00 2,750.00 5.12 1.00
8/1/2022 12780 30303 16,040.00 2,750.00 5.83 1.00
8/1/2022 12781 30438 13,430.00 2,750.00 4.88 1.00
8/1/2022 12782 30243 19,210.00 2,750.00 6.99 1.00
8/1/2022 12783 30274 16,390.00 2,750.00 5.96 1.00
8/1/2022 12784 30474 12,660.00 2,750.00 4.60 1.00
8/1/2022 12785 30299 16,180.00 2,750.00 5.88 1.00
8/1/2022 12786 30366 20,920.00 2,750.00 7.61 1.00
8/1/2022 12787 30562 14,070.00 2,750.00 5.12 1.00
8/1/2022 12788 30297 21,050.00 2,750.00 7.65 1.00
8/1/2022 12789 30373 17,480.00 2,750.00 6.36 1.00
8/1/2022 12790 3096 13,170.00 2,750.00 4.79 1.00
8/1/2022 12791 30358 19,100.00 2,750.00 6.95 1.00
8/1/2022 12792 30364 19,580.00 2,750.00 7.12 1.00
8/1/2022 12793 30294 16,720.00 2,750.00 6.08 1.00
8/1/2022 12794 30296 16,900.00 2,750.00 6.15 1.00
8/1/2022 12795 30300 17,950.00 2,750.00 6.53 1.00
8/1/2022 12796 30438 13,270.00 2,750.00 4.83 1.00
8/1/2022 12797 30274 21,030.00 2,750.00 7.65 1.00
8/1/2022 12798 30299 20,380.00 2,750.00 7.41 1.00
8/1/2022 12799 30303 18,490.00 2,750.00 6.72 1.00
8/1/2022 12800 30562 18,280.00 2,750.00 6.65 1.00
8/1/2022 12801 30106 14,650.00 2,750.00 5.33 1.00
8/1/2022 12802 30366 18,130.00 2,750.00 6.59 1.00
8/1/2022 12803 30445 14,700.00 2,750.00 5.35 1.00
8/1/2022 12804 30360 20,290.00 2,750.00 7.38 1.00
8/1/2022 12805 30275 20,940.00 2,750.00 7.61 1.00
8/1/2022 12806 30243 19,700.00 2,750.00 7.16 1.00
8/1/2022 12807 30273 16,950.00 2,750.00 6.16 1.00
8/1/2022 12808 30297 21,450.00 2,750.00 7.80 1.00
8/1/2022 12809 30493 14,770.00 2,750.00 5.37 1.00
8/1/2022 12810 30153 14,610.00 2,750.00 5.31 1.00
8/1/2022 12811 30364 19,500.00 2,750.00 7.09 1.00
8/1/2022 12812 30294 16,770.00 2,750.00 6.10 1.00
8/1/2022 12813 30296 17,960.00 2,750.00 6.53 1.00
8/1/2022 12814 30300 18,820.00 2,750.00 6.84 1.00
8/1/2022 12815 30358 18,180.00 2,750.00 6.61 1.00
8/1/2022 12816 30299 17,280.00 2,750.00 6.28 1.00
8/1/2022 12817 30562 17,770.00 2,750.00 6.46 1.00
8/1/2022 12818 30303 18,150.00 2,750.00 6.60 1.00
8/1/2022 12819 30274 16,320.00 2,750.00 5.93 1.00
8/1/2022 12820 30243 11,640.00 2,750.00 4.23 1.00
8/1/2022 12821 30366 22,180.00 2,750.00 8.07 1.00
8/1/2022 12822 30360 14,810.00 2,750.00 5.39 1.00
8/1/2022 12823 30275 18,280.00 2,750.00 6.65 1.00
8/1/2022 12824 30273 17,070.00 2,750.00 6.21 1.00
8/1/2022 12825 30294 13,160.00 2,750.00 4.79 1.00
8/1/2022 12826 30296 15,940.00 2,750.00 5.80 1.00
8/1/2022 12827 30300 17,530.00 2,750.00 6.37 1.00
8/1/2022 12828 30297 20,340.00 2,750.00 7.40 1.00
8/1/2022 12829 30364 20,610.00 2,750.00 7.49 1.00
8/1/2022 12830 30358 21,640.00 2,750.00 7.87 1.00
8/1/2022 12831 30562 14,640.00 2,750.00 5.32 1.00
8/1/2022 12832 30153 16,750.00 2,750.00 6.09 1.00
8/1/2022 12833 30299 16,310.00 2,750.00 5.93 1.00
8/1/2022 12834 30274 17,850.00 2,750.00 6.49 1.00
8/1/2022 12835 30366 17,590.00 2,750.00 6.40 1.00
8/1/2022 12836 30243 18,510.00 2,750.00 6.73 1.00
8/1/2022 12837 30360 18,660.00 2,750.00 6.79 1.00
8/1/2022 12838 30275 17,990.00 2,750.00 6.54 1.00
8/1/2022 12839 30273 14,540.00 2,750.00 5.29 1.00
8/1/2022 12840 30300 16,360.00 2,750.00 5.95 1.00
8/1/2022 12841 30296 16,360.00 2,750.00 5.95 1.00
8/1/2022 12842 30297 14,930.00 2,750.00 5.43 1.00
8/1/2022 12843 30445 17,140.00 2,750.00 6.23 1.00
8/1/2022 12844 30364 17,730.00 2,750.00 6.45 1.00
8/1/2022 12845 30358 18,470.00 2,750.00 6.72 1.00
8/1/2022 12846 30294 16,330.00 2,750.00 5.94 1.00
TOTALES 1,600,560.00 255,750.00 582.06 93.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 364 30-364


Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 125 30-125
Bolon CAMBIO LINEA WAWA 30 - 810 30-810
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 474 30-474
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 96 30-96
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 445 30-445
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 445 30-445
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
8/2/2022 12847 30366 16,730.00 2,750.00 6.08 1.00
8/2/2022 12848 30303 15,540.00 2,750.00 5.65 1.00
8/2/2022 12849 30364 15,720.00 2,750.00 5.72 1.00
8/2/2022 12850 30358 19,670.00 2,750.00 7.15 1.00
8/2/2022 12851 30296 16,540.00 2,750.00 6.01 1.00
8/2/2022 12852 30300 14,840.00 2,750.00 5.40 1.00
8/2/2022 12853 30360 18,430.00 2,750.00 6.70 1.00
8/2/2022 12854 30273 18,700.00 2,750.00 6.80 1.00
8/2/2022 12855 30243 18,870.00 2,750.00 6.86 1.00
8/2/2022 12856 30274 41,420.00 2,750.00 15.06 1.00
8/2/2022 12857 30275 18,570.00 2,750.00 6.75 1.00
8/2/2022 12858 30297 16,250.00 2,750.00 5.91 1.00
8/2/2022 12859 30366 18,970.00 2,750.00 6.90 1.00
8/2/2022 12860 30303 15,420.00 2,750.00 5.61 1.00
8/2/2022 12861 30364 17,960.00 2,750.00 6.53 1.00
8/2/2022 12862 30274 16,520.00 2,750.00 6.01 1.00
8/2/2022 12863 30300 17,990.00 2,750.00 6.54 1.00
8/2/2022 12864 30273 18,160.00 2,750.00 6.60 1.00
8/2/2022 12865 30296 20,350.00 2,750.00 7.40 1.00
8/2/2022 12866 30297 19,030.00 2,750.00 6.92 1.00
8/2/2022 12867 30275 20,620.00 2,750.00 7.50 1.00
8/2/2022 12868 30299 18,590.00 2,750.00 6.76 1.00
8/2/2022 12869 30294 14,120.00 2,750.00 5.13 1.00
8/2/2022 12870 30358 18,200.00 2,750.00 6.62 1.00
8/2/2022 12871 30366 20,250.00 2,750.00 7.36 1.00
8/2/2022 12872 30300 16,250.00 2,750.00 5.91 1.00
8/2/2022 12873 30274 21,050.00 2,750.00 7.65 1.00
8/2/2022 12874 30303 15,840.00 2,750.00 5.76 1.00
8/2/2022 12875 30562 15,370.00 2,750.00 5.59 1.00
8/2/2022 12876 30296 17,920.00 2,750.00 6.52 1.00
8/2/2022 12877 30275 18,320.00 2,750.00 6.66 1.00
8/2/2022 12878 30273 20,120.00 2,750.00 7.32 1.00
8/2/2022 12879 30294 15,160.00 2,750.00 5.51 1.00
8/2/2022 12880 30243 20,950.00 2,750.00 7.62 1.00
8/2/2022 12881 30299 18,080.00 2,750.00 6.57 1.00
8/2/2022 12882 30300 17,160.00 2,750.00 6.24 1.00
8/2/2022 12883 30303 16,810.00 2,750.00 6.11 1.00
8/2/2022 12884 30562 17,380.00 2,750.00 6.32 1.00
8/2/2022 12885 30274 19,140.00 2,750.00 6.96 1.00
8/2/2022 12886 30366 19,570.00 2,750.00 7.12 1.00
8/2/2022 12887 30297 19,720.00 2,750.00 7.17 1.00
8/2/2022 12888 30296 17,920.00 2,750.00 6.52 1.00
8/2/2022 12889 30360 17,070.00 2,750.00 6.21 1.00
8/2/2022 12890 30358 19,180.00 2,750.00 6.97 1.00
8/2/2022 12891 30273 19,700.00 2,750.00 7.16 1.00
8/2/2022 12892 30299 18,640.00 2,750.00 6.78 1.00
8/2/2022 12893 30243 18,670.00 2,750.00 6.79 1.00
8/2/2022 12894 30275 19,270.00 2,750.00 7.01 1.00
8/2/2022 12895 30294 17,750.00 2,750.00 6.45 1.00
8/2/2022 12896 30300 20,750.00 2,750.00 7.55 1.00
8/2/2022 12897 30364 17,050.00 2,750.00 6.20 1.00
8/2/2022 12898 30303 18,250.00 2,750.00 6.64 1.00
8/2/2022 12899 30493 12,250.00 2,750.00 4.45 1.00
8/2/2022 12900 30474 14,400.00 2,750.00 5.24 1.00
8/2/2022 12901 30448 16,590.00 2,750.00 6.03 1.00
8/2/2022 12902 30274 17,620.00 2,750.00 6.41 1.00
8/2/2022 12903 30366 19,900.00 2,750.00 7.24 1.00
8/2/2022 12904 30562 15,020.00 2,750.00 5.46 1.00
8/2/2022 12905 30297 18,960.00 2,750.00 6.89 1.00
8/2/2022 12906 30360 19,890.00 2,750.00 7.23 1.00
8/2/2022 12907 30296 17,650.00 2,750.00 6.42 1.00
8/2/2022 12908 30445 17,650.00 2,750.00 6.42 1.00
8/2/2022 12909 30358 19,160.00 2,750.00 6.97 1.00
8/2/2022 12910 30810 13,960.00 2,750.00 5.08 1.00
8/2/2022 12911 30125 11,700.00 2,750.00 4.25 1.00
8/2/2022 12912 30273 18,480.00 2,750.00 6.72 1.00
8/2/2022 12913 30275 17,810.00 2,750.00 6.48 1.00
8/2/2022 12914 30299 18,280.00 2,750.00 6.65 1.00
8/2/2022 12915 30106 14,010.00 2,750.00 5.09 1.00
8/2/2022 12916 30364 20,610.00 2,750.00 7.49 1.00
8/2/2022 12917 30243 16,210.00 2,750.00 5.89 1.00
8/2/2022 12918 30193 15,350.00 2,750.00 5.58 1.00
8/2/2022 12919 3096 19,890.00 2,750.00 7.23 1.00
TOTALES 1,315,940.00 200,750.00 478.50 73.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 366 30-366


Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Bolon CAMBIO LINEA WAWA
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
8/3/2022 12920 30300 16,220.00 2,750.00 5.90 1.00
8/3/2022 12921 30360 13,890.00 2,750.00 5.05 1.00
8/3/2022 12922 30358 16,440.00 2,750.00 5.98 1.00
8/3/2022 12923 30273 16,880.00 2,750.00 6.14 1.00
8/3/2022 12924 30294 16,660.00 2,750.00 6.06 1.00
8/3/2022 12925 30299 18,280.00 2,750.00 6.65 1.00
8/3/2022 12926 30275 19,450.00 2,750.00 7.07 1.00
8/3/2022 12927 30296 13,910.00 2,750.00 5.06 1.00
8/3/2022 12928 30300 17,060.00 2,750.00 6.20 1.00
8/3/2022 12929 30273 15,170.00 2,750.00 5.52 1.00
8/3/2022 12930 30274 15,460.00 2,750.00 5.62 1.00
8/3/2022 12931 30296 16,200.00 2,750.00 5.89 1.00
8/3/2022 12932 30299 15,980.00 2,750.00 5.81 1.00
8/3/2022 12933 30275 17,180.00 2,750.00 6.25 1.00
8/3/2022 12934 30562 15,020.00 2,750.00 5.46 1.00
8/3/2022 12935 30300 16,590.00 2,750.00 6.03 1.00
8/3/2022 12936 30296 17,330.00 2,750.00 6.30 1.00
8/3/2022 12937 30273 16,520.00 2,750.00 6.01 1.00
8/3/2022 12938 30275 19,130.00 2,750.00 6.96 1.00
8/3/2022 12939 30299 17,740.00 2,750.00 6.45 1.00
8/3/2022 12940 30294 15,520.00 2,750.00 5.64 1.00
8/3/2022 12941 30274 16,860.00 2,750.00 6.13 1.00
8/3/2022 12942 30562 14,410.00 2,750.00 5.24 1.00
8/3/2022 12943 30297 18,350.00 2,750.00 6.67 1.00
8/3/2022 12944 30296 15,960.00 2,750.00 5.80 1.00
8/3/2022 12945 30300 17,810.00 2,750.00 6.48 1.00
8/3/2022 12946 30364 19,440.00 2,750.00 7.07 1.00
8/3/2022 12947 30273 17,710.00 2,750.00 6.44 1.00
8/3/2022 12948 30275 18,190.00 2,750.00 6.61 1.00
8/3/2022 12949 30303 17,480.00 2,750.00 6.36 1.00
8/3/2022 12950 30438 14,410.00 2,750.00 5.24 1.00
8/3/2022 12951 30294 16,850.00 2,750.00 6.13 1.00
8/3/2022 12952 30360 16,720.00 2,750.00 6.08 1.00
8/3/2022 12953 30358 20,510.00 2,750.00 7.46 1.00
8/3/2022 12954 30274 17,280.00 2,750.00 6.28 1.00
8/3/2022 12955 30297 18,870.00 2,750.00 6.86 1.00
8/3/2022 12956 30243 19,590.00 2,750.00 7.12 1.00
8/3/2022 12957 30296 18,450.00 2,750.00 6.71 1.00
8/3/2022 12958 30300 18,700.00 2,750.00 6.80 1.00
8/3/2022 12959 30303 13,950.00 2,750.00 5.07 1.00
8/3/2022 12960 30562 12,780.00 2,750.00 4.65 1.00
8/3/2022 12961 30273 19,600.00 2,750.00 7.13 1.00
8/3/2022 12962 30364 19,670.00 2,750.00 7.15 1.00
8/3/2022 12963 30153 12,730.00 2,750.00 4.63 1.00
8/3/2022 12964 30106 16,060.00 2,750.00 5.84 1.00
8/3/2022 12965 30299 18,350.00 2,750.00 6.67 1.00
8/3/2022 12966 30275 16,380.00 2,750.00 5.96 1.00
8/3/2022 12967 30294 13,720.00 2,750.00 4.99 1.00
8/3/2022 12968 30360 17,770.00 2,750.00 6.46 1.00
8/3/2022 12969 30445 14,320.00 2,750.00 5.21 1.00
8/3/2022 12970 30358 19,750.00 2,750.00 7.18 1.00
8/3/2022 12971 30296 13,250.00 2,750.00 4.82 1.00
8/3/2022 12972 30193 13,790.00 2,750.00 5.01 1.00
8/3/2022 12973 30243 14,720.00 2,750.00 5.35 1.00
8/3/2022 12974 3096 12,910.00 2,750.00 4.69 1.00
8/3/2022 12975 30274 19,740.00 2,750.00 7.18 1.00
8/3/2022 12976 30300 20,090.00 2,750.00 7.31 1.00
8/3/2022 12977 30303 17,300.00 2,750.00 6.29 1.00
8/3/2022 12978 30364 18,130.00 2,750.00 6.59 1.00
8/3/2022 12979 30562 13,040.00 2,750.00 4.74 1.00
8/3/2022 12980 30273 16,690.00 2,750.00 6.07 1.00
8/3/2022 12981 30438 18,000.00 2,750.00 6.55 1.00
8/3/2022 12982 30358 19,170.00 2,750.00 6.97 1.00
8/3/2022 12983 30106 15,780.00 2,750.00 5.74 1.00
8/3/2022 12984 30294 13,790.00 2,750.00 5.01 1.00
8/3/2022 12985 30455 16,050.00 2,750.00 5.84 1.00
8/3/2022 12986 30299 17,780.00 2,750.00 6.47 1.00
8/3/2022 12987 30360 18,020.00 2,750.00 6.55 1.00
8/3/2022 12988 30193 10,620.00 2,750.00 3.86 1.00
TOTALES 1,148,170.00 189,750.00 417.51 69.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 300 30-300


Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 445 30-445
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 193 30-193
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 96 30-96
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 455 30-455
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 193 30-193
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
8/4/2022 12989 30294 27,920.00 2,750.00 10.15 1.00
8/4/2022 12990 30807 16,740.00 2,750.00 6.09 1.00
8/4/2022 12991 30364 19,630.00 2,750.00 7.14 1.00
8/4/2022 12992 30445 18,540.00 2,750.00 6.74 1.00
8/4/2022 12993 30448 16,660.00 2,750.00 6.06 1.00
8/4/2022 12994 30164 23,520.00 2,750.00 8.55 1.00
8/4/2022 12995 30360 15,080.00 2,750.00 5.48 1.00
8/4/2022 12996 30273 15,290.00 2,750.00 5.56 1.00
8/4/2022 12997 30274 20,450.00 2,750.00 7.44 1.00
8/4/2022 12998 30483 12,760.00 2,750.00 4.64 1.00
8/4/2022 12999 30303 17,140.00 2,750.00 6.23 1.00
8/4/2022 13000 30299 16,390.00 2,750.00 5.96 1.00
8/4/2022 13001 30275 19,730.00 2,750.00 7.17 1.00
8/4/2022 13002 30474 13,460.00 2,750.00 4.89 1.00
8/4/2022 13003 30296 18,460.00 2,750.00 6.71 1.00
8/4/2022 13004 30243 16,610.00 2,750.00 6.04 1.00
8/4/2022 13005 30153 15,240.00 2,750.00 5.54 1.00
8/4/2022 13006 30438 14,800.00 2,750.00 5.38 1.00
8/4/2022 13007 30184 11,680.00 2,750.00 4.25 1.00
8/4/2022 13008 30364 18,620.00 2,750.00 6.77 1.00
8/4/2022 13009 30125 17,600.00 2,750.00 6.40 1.00
8/4/2022 13010 30274 22,420.00 2,750.00 8.15 1.00
8/4/2022 13011 30297 19,080.00 2,750.00 6.94 1.00
8/4/2022 13012 30360 17,790.00 2,750.00 6.47 1.00
8/4/2022 13013 30300 19,080.00 2,750.00 6.94 1.00
8/4/2022 13014 30273 20,700.00 2,750.00 7.53 1.00
8/4/2022 13015 30303 16,710.00 2,750.00 6.08 1.00
8/4/2022 13016 30299 20,590.00 2,750.00 7.49 1.00
8/4/2022 13017 30296 19,610.00 2,750.00 7.13 1.00
8/4/2022 13018 30243 20,650.00 2,750.00 7.51 1.00
8/4/2022 13019 30184 14,750.00 2,750.00 5.36 1.00
8/4/2022 13020 30275 17,160.00 2,750.00 6.24 1.00
8/4/2022 13021 30164 15,290.00 2,750.00 5.56 1.00
8/4/2022 13022 30364 18,980.00 2,750.00 6.90 1.00
8/4/2022 13023 30366 13,920.00 2,750.00 5.06 1.00
8/4/2022 13024 30297 18,350.00 2,750.00 6.67 1.00
8/4/2022 13025 30810 17,350.00 2,750.00 6.31 1.00
8/4/2022 13026 30106 14,340.00 2,750.00 5.21 1.00
8/4/2022 13027 30273 19,650.00 2,750.00 7.15 1.00
8/4/2022 13028 30274 19,340.00 2,750.00 7.03 1.00
8/4/2022 13029 30303 17,500.00 2,750.00 6.36 1.00
8/4/2022 13030 30360 17,650.00 2,750.00 6.42 1.00
8/4/2022 13031 30294 15,450.00 2,750.00 5.62 1.00
8/4/2022 13032 30184 12,440.00 2,750.00 4.52 1.00
8/4/2022 13033 30243 15,930.00 2,750.00 5.79 1.00
8/4/2022 13034 30445 16,230.00 2,750.00 5.90 1.00
8/4/2022 13035 30296 19,610.00 2,750.00 7.13 1.00
8/4/2022 13036 30364 21,160.00 2,750.00 7.69 1.00
8/4/2022 13037 30299 17,260.00 2,750.00 6.28 1.00
8/4/2022 13038 30300 21,010.00 2,750.00 7.64 1.00
8/4/2022 13039 30438 16,470.00 2,750.00 5.99 1.00
8/4/2022 13040 30164 17,390.00 2,750.00 6.32 1.00
8/4/2022 13041 30144 13,220.00 2,750.00 4.81 1.00
8/4/2022 13042 30275 20,860.00 2,750.00 7.59 1.00
8/4/2022 13043 30153 12,430.00 2,750.00 4.52 1.00
8/4/2022 13044 30807 15,490.00 2,750.00 5.63 1.00
8/4/2022 13045 30366 19,180.00 2,750.00 6.97 1.00
8/4/2022 13046 30373 14,860.00 2,750.00 5.40 1.00
8/4/2022 13047 30474 10,390.00 2,750.00 3.78 1.00
8/4/2022 13048 30810 17,280.00 2,750.00 6.28 1.00
8/4/2022 13049 30493 9,490.00 2,750.00 3.45 1.00
8/4/2022 13050 30184 10,200.00 2,750.00 3.71 1.00
8/4/2022 13051 30273 18,830.00 2,750.00 6.85 1.00
8/4/2022 13052 30445 15,660.00 2,750.00 5.69 1.00
8/4/2022 13053 30294 18,670.00 2,750.00 6.79 1.00
8/4/2022 13054 30243 18,450.00 2,750.00 6.71 1.00
8/4/2022 13055 30296 18,640.00 2,750.00 6.78 1.00
8/4/2022 13056 30303 18,780.00 2,750.00 6.83 1.00
8/4/2022 13057 30364 20,930.00 2,750.00 7.61 1.00
8/4/2022 13058 30300 19,110.00 2,750.00 6.95 1.00
8/4/2022 13059 30438 15,690.00 2,750.00 5.71 1.00
8/4/2022 13060 30360 17,510.00 2,750.00 6.37 1.00
8/4/2022 13061 30299 18,910.00 2,750.00 6.88 1.00
8/4/2022 13062 30275 19,240.00 2,750.00 7.00 1.00
8/4/2022 13063 30274 21,870.00 2,750.00 7.95 1.00
8/4/2022 13064 30184 8,460.00 2,750.00 3.08 1.00
8/4/2022 13065 30273 17,270.00 2,750.00 6.28 1.00
8/4/2022 13066 30294 14,050.00 2,750.00 5.11 1.00
8/4/2022 13067 30303 17,630.00 2,750.00 6.41 1.00
8/4/2022 13068 30300 18,090.00 2,750.00 6.58 1.00
8/4/2022 13069 30296 17,150.00 2,750.00 6.24 1.00
8/4/2022 13070 30364 20,920.00 2,750.00 7.61 1.00
8/4/2022 13071 30243 16,880.00 2,750.00 6.14 1.00
8/4/2022 13072 30299 21,100.00 2,750.00 7.67 1.00
TOTALES 1,457,420.00 231,000.00 529.96 84.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 294 30-294


Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 445 30-445
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 483 30-483
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 474 30-474
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 125 30-125
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 810 30-810
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 445 30-445
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 474 30-474
Bolon CAMBIO LINEA WAWA 30 - 810 30-810
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 445 30-445
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
8/5/2022 13073 30364 18,620.00 2,750.00 6.77 1.00
8/5/2022 13074 30358 16,250.00 2,750.00 5.91 1.00
8/5/2022 13075 30445 14,720.00 2,750.00 5.35 1.00
8/5/2022 13076 30373 16,530.00 2,750.00 6.01 1.00
8/5/2022 13077 30184 12,300.00 2,750.00 4.47 1.00
8/5/2022 13078 30448 13,610.00 2,750.00 4.95 1.00
8/5/2022 13079 30438 11,460.00 2,750.00 4.17 1.00
8/5/2022 13080 30294 15,880.00 2,750.00 5.77 1.00
8/5/2022 13081 30274 19,630.00 2,750.00 7.14 1.00
8/5/2022 13082 30438 15,150.00 2,750.00 5.51 1.00
8/5/2022 13083 30360 15,230.00 2,750.00 5.54 1.00
8/5/2022 13084 30243 18,590.00 2,750.00 6.76 1.00
8/5/2022 13085 30296 18,380.00 2,750.00 6.68 1.00
8/5/2022 13086 30153 15,030.00 2,750.00 5.47 1.00
8/5/2022 13087 30493 13,230.00 2,750.00 4.81 1.00
8/5/2022 13088 30303 16,090.00 2,750.00 5.85 1.00
8/5/2022 13089 30297 18,580.00 2,750.00 6.76 1.00
8/5/2022 13090 30144 16,240.00 2,750.00 5.91 1.00
8/5/2022 13091 30364 20,660.00 2,750.00 7.51 1.00
8/5/2022 13092 30366 19,270.00 2,750.00 7.01 1.00
8/5/2022 13093 2,750.00 0.00 1.00
8/5/2022 13094 30299 21,050.00 2,750.00 7.65 1.00
8/5/2022 13095 30474 14,060.00 2,750.00 5.11 1.00
8/5/2022 13096 30106 11,730.00 2,750.00 4.27 1.00
8/5/2022 13097 30125 16,240.00 2,750.00 5.91 1.00
8/5/2022 13098 3096 13,830.00 2,750.00 5.03 1.00
8/5/2022 13099 30300 19,420.00 2,750.00 7.06 1.00
8/5/2022 13100 30122 12,240.00 2,750.00 4.45 1.00
8/5/2022 13101 30358 18,050.00 2,750.00 6.56 1.00
8/5/2022 13102 30184 13,340.00 2,750.00 4.85 1.00
8/5/2022 13103 30296 14,220.00 2,750.00 5.17 1.00
8/5/2022 13104 30297 19,150.00 2,750.00 6.96 1.00
8/5/2022 13105 30303 16,840.00 2,750.00 6.12 1.00
8/5/2022 13106 30364 19,670.00 2,750.00 7.15 1.00
8/5/2022 13107 30294 13,640.00 2,750.00 4.96 1.00
8/5/2022 13108 30275 17,270.00 2,750.00 6.28 1.00
8/5/2022 13109 30299 15,970.00 2,750.00 5.81 1.00
8/5/2022 13110 30366 19,550.00 2,750.00 7.11 1.00
8/5/2022 13111 30358 20,400.00 2,750.00 7.42 1.00
8/5/2022 13112 30184 11,850.00 2,750.00 4.31 1.00
8/5/2022 13113 30243 3,660.00 2,750.00 1.33 1.00
8/5/2022 13114 30296 19,870.00 2,750.00 7.23 1.00
8/5/2022 13115 30274 18,920.00 2,750.00 6.88 1.00
8/5/2022 13116 30303 18,050.00 2,750.00 6.56 1.00
8/5/2022 13117 30364 18,000.00 2,750.00 6.55 1.00
8/5/2022 13118 30294 16,470.00 2,750.00 5.99 1.00
8/5/2022 13119 30275 19,610.00 2,750.00 7.13 1.00
8/5/2022 13120 30299 19,370.00 2,750.00 7.04 1.00
8/5/2022 13121 30297 18,220.00 2,750.00 6.63 1.00
8/5/2022 13122 30243 17,120.00 2,750.00 6.23 1.00
8/5/2022 13123 30274 20,120.00 2,750.00 7.32 1.00
8/5/2022 13124 30358 19,710.00 2,750.00 7.17 1.00
8/5/2022 13125 30300 18,210.00 2,750.00 6.62 1.00
8/5/2022 13126 30303 15,630.00 2,750.00 5.68 1.00
8/5/2022 13127 30364 18,130.00 2,750.00 6.59 1.00
8/5/2022 13128 30294 13,550.00 2,750.00 4.93 1.00
8/5/2022 13129 30243 10,860.00 2,750.00 3.95 1.00
8/5/2022 13130 30275 21,660.00 2,750.00 7.88 1.00
8/5/2022 13131 30299 18,910.00 2,750.00 6.88 1.00
8/5/2022 13132 30366 19,270.00 2,750.00 7.01 1.00
8/5/2022 13133 30296 18,650.00 2,750.00 6.78 1.00
8/5/2022 13134 30184 11,290.00 2,750.00 4.11 1.00
8/5/2022 13135 30274 17,580.00 2,750.00 6.39 1.00
8/5/2022 13136 30358 18,590.00 2,750.00 6.76 1.00
8/5/2022 13137 30303 18,370.00 2,750.00 6.68 1.00
8/5/2022 13138 30300 17,410.00 2,750.00 6.33 1.00
8/5/2022 13139 30364 17,220.00 2,750.00 6.26 1.00
8/5/2022 13140 30299 16,980.00 2,750.00 6.17 1.00
8/5/2022 13141 30562 17,280.00 2,750.00 6.28 1.00
8/5/2022 13142 30294 15,380.00 2,750.00 5.59 1.00
8/5/2022 13143 30243 17,990.00 2,750.00 6.54 1.00
8/5/2022 13144 30296 15,720.00 2,750.00 5.72 1.00
8/5/2022 13145 30366 19,240.00 2,750.00 7.00 1.00
8/5/2022 13146 30358 19,750.00 2,750.00 7.18 1.00
8/5/2022 13147 30300 17,330.00 2,750.00 6.30 1.00
8/5/2022 13148 30274 19,000.00 2,750.00 6.91 1.00
TOTALES 1,257,090.00 209,000.00 457.13 76.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 364 30-364


Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 445 30-445
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 474 30-474
Bolon CAMBIO LINEA WAWA 30 - 106 30-106
Bolon CAMBIO LINEA WAWA 30 - 125 30-125
Bolon CAMBIO LINEA WAWA 30 - 96 30-96
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 122 30-122
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
8/7/2022 13224 30364 20,600.00 2,750.00 7.49 1.00
8/7/2022 13225 30297 20,200.00 2,750.00 7.35 1.00
8/7/2022 13226 30360 20,990.00 2,750.00 7.63 1.00
8/7/2022 13227 30358 23,540.00 2,750.00 8.56 1.00
8/7/2022 13228 30273 19,030.00 2,750.00 6.92 1.00
8/7/2022 13229 30294 18,370.00 2,750.00 6.68 1.00
8/7/2022 13230 30275 19,000.00 2,750.00 6.91 1.00
8/7/2022 13231 30300 20,660.00 2,750.00 7.51 1.00
8/7/2022 13232 30303 17,800.00 2,750.00 6.47 1.00
8/7/2022 13233 30243 34,420.00 2,750.00 12.52 1.00
8/7/2022 13234 30562 14,510.00 2,750.00 5.28 1.00
8/7/2022 13235 30299 17,370.00 2,750.00 6.32 1.00
8/7/2022 13236 30297 20,050.00 2,750.00 7.29 1.00
8/7/2022 13237 30364 19,530.00 2,750.00 7.10 1.00
8/7/2022 13238 30358 20,390.00 2,750.00 7.41 1.00
8/7/2022 13239 30360 17,250.00 2,750.00 6.27 1.00
8/7/2022 13240 30273 16,320.00 2,750.00 5.93 1.00
8/7/2022 13241 30275 18,820.00 2,750.00 6.84 1.00
8/7/2022 13242 30365 19,980.00 2,750.00 7.27 1.00
8/7/2022 13243 30294 16,560.00 2,750.00 6.02 1.00
8/7/2022 13244 30300 16,570.00 2,750.00 6.03 1.00
8/7/2022 13245 30303 17,440.00 2,750.00 6.34 1.00
8/7/2022 13246 30562 14,920.00 2,750.00 5.43 1.00
8/7/2022 13247 30297 17,330.00 2,750.00 6.30 1.00
8/7/2022 13248 30358 18,960.00 2,750.00 6.89 1.00
8/7/2022 13249 30364 20,150.00 2,750.00 7.33 1.00
8/7/2022 13250 30243 20,110.00 2,750.00 7.31 1.00
8/7/2022 13251 30274 21,670.00 2,750.00 7.88 1.00
8/7/2022 13252 30275 17,650.00 2,750.00 6.42 1.00
8/7/2022 13253 30303 18,240.00 2,750.00 6.63 1.00
8/7/2022 13254 30300 16,760.00 2,750.00 6.09 1.00
8/7/2022 13255 30273 18,440.00 2,750.00 6.71 1.00
8/7/2022 13256 30365 19,720.00 2,750.00 7.17 1.00
8/7/2022 13257 30358 20,600.00 2,750.00 7.49 1.00
8/7/2022 13258 30364 17,830.00 2,750.00 6.48 1.00
8/7/2022 13259 30300 28,320.00 2,750.00 10.30 1.00
8/7/2022 13260 30297 19,320.00 2,750.00 7.03 1.00
8/7/2022 13261 30562 18,470.00 2,750.00 6.72 1.00
8/7/2022 13262 30274 21,570.00 2,750.00 7.84 1.00
8/7/2022 13263 30360 16,900.00 2,750.00 6.15 1.00
8/7/2022 13264 30275 18,030.00 2,750.00 6.56 1.00
8/7/2022 13265 30243 18,250.00 2,750.00 6.64 1.00
8/7/2022 13266 30303 16,600.00 2,750.00 6.04 1.00
8/7/2022 13267 30273 15,490.00 2,750.00 5.63 1.00
8/7/2022 13268 30365 19,920.00 2,750.00 7.24 1.00
8/7/2022 13269 30358 19,180.00 2,750.00 6.97 1.00
8/7/2022 13270 30299 14,840.00 2,750.00 5.40 1.00
8/7/2022 13271 30125 17,150.00 2,750.00 6.24 1.00
8/7/2022 13272 30364 18,350.00 2,750.00 6.67 1.00
TOTALES 934,170.00 134,750.00 339.70 49.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 364 30-364


Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 125 30-125
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
8/6/2022 13149 30358 18,830.00 2,750.00 6.85 1.00
8/6/2022 13150 30303 16,380.00 2,750.00 5.96 1.00
8/6/2022 13151 30294 14,750.00 2,750.00 5.36 1.00
8/6/2022 13152 30296 18,220.00 2,750.00 6.63 1.00
8/6/2022 13153 30364 19,270.00 2,750.00 7.01 1.00
8/6/2022 13154 30273 18,130.00 2,750.00 6.59 1.00
8/6/2022 13155 30300 19,830.00 2,750.00 7.21 1.00
8/6/2022 13156 30274 18,530.00 2,750.00 6.74 1.00
8/6/2022 13157 30299 21,600.00 2,750.00 7.85 1.00
8/6/2022 13158 30366 16,910.00 2,750.00 6.15 1.00
8/6/2022 13159 30297 17,300.00 2,750.00 6.29 1.00
8/6/2022 13160 30184 11,790.00 2,750.00 4.29 1.00
8/6/2022 13161 30243 20,030.00 2,750.00 7.28 1.00
8/6/2022 13162 30275 14,880.00 2,750.00 5.41 1.00
8/6/2022 13163 30360 16,750.00 2,750.00 6.09 1.00
8/6/2022 13164 30358 19,830.00 2,750.00 7.21 1.00
8/6/2022 13165 30364 19,870.00 2,750.00 7.23 1.00
8/6/2022 13166 30294 13,610.00 2,750.00 4.95 1.00
8/6/2022 13167 30303 16,860.00 2,750.00 6.13 1.00
8/6/2022 13168 30296 17,420.00 2,750.00 6.33 1.00
8/6/2022 13169 30300 17,100.00 2,750.00 6.22 1.00
8/6/2022 13170 30366 19,860.00 2,750.00 7.22 1.00
8/6/2022 13171 30274 21,680.00 2,750.00 7.88 1.00
8/6/2022 13172 30273 18,280.00 2,750.00 6.65 1.00
8/6/2022 13173 30299 18,450.00 2,750.00 6.71 1.00
8/6/2022 13174 30297 18,850.00 2,750.00 6.85 1.00
8/6/2022 13175 30243 15,670.00 2,750.00 5.70 1.00
8/6/2022 13176 30276 18,870.00 2,750.00 6.86 1.00
8/6/2022 13177 30296 18,730.00 2,750.00 6.81 1.00
8/6/2022 13178 30358 22,410.00 2,750.00 8.15 1.00
8/6/2022 13179 30364 20,090.00 2,750.00 7.31 1.00
8/6/2022 13180 30294 18,370.00 2,750.00 6.68 1.00
8/6/2022 13181 30303 16,670.00 2,750.00 6.06 1.00
8/6/2022 13182 30360 18,150.00 2,750.00 6.60 1.00
8/6/2022 13183 30366 17,930.00 2,750.00 6.52 1.00
8/6/2022 13184 30184 12,970.00 2,750.00 4.72 1.00
8/6/2022 13185 30300 23,650.00 2,750.00 8.60 1.00
8/6/2022 13186 30273 20,230.00 2,750.00 7.36 1.00
8/6/2022 13187 30243 15,560.00 2,750.00 5.66 1.00
8/6/2022 13188 30297 20,130.00 2,750.00 7.32 1.00
8/6/2022 13189 30274 17,410.00 2,750.00 6.33 1.00
8/6/2022 13190 30364 18,350.00 2,750.00 6.67 1.00
8/6/2022 13191 30299 20,420.00 2,750.00 7.43 1.00
8/6/2022 13192 30562 15,060.00 2,750.00 5.48 1.00
8/6/2022 13193 30294 18,770.00 2,750.00 6.83 1.00
8/6/2022 13194 30296 20,860.00 2,750.00 7.59 1.00
8/6/2022 13195 30366 18,780.00 2,750.00 6.83 1.00
8/6/2022 13196 30184 11,460.00 2,750.00 4.17 1.00
8/6/2022 13197 30303 15,640.00 2,750.00 5.69 1.00
8/6/2022 13198 30360 16,080.00 2,750.00 5.85 1.00
8/6/2022 13199 30300 17,880.00 2,750.00 6.50 1.00
8/6/2022 13200 30273 18,190.00 2,750.00 6.61 1.00
8/6/2022 13201 30297 16,640.00 2,750.00 6.05 1.00
8/6/2022 13202 30358 20,610.00 2,750.00 7.49 1.00
8/6/2022 13203 30364 18,760.00 2,750.00 6.82 1.00
8/6/2022 13204 30243 14,710.00 2,750.00 5.35 1.00
8/6/2022 13205 30562 15,850.00 2,750.00 5.76 1.00
8/6/2022 13206 30294 18,460.00 2,750.00 6.71 1.00
8/6/2022 13207 30296 15,870.00 2,750.00 5.77 1.00
8/6/2022 13208 30299 19,200.00 2,750.00 6.98 1.00
8/6/2022 13209 30184 10,040.00 2,750.00 3.65 1.00
8/6/2022 13210 30303 20,130.00 2,750.00 7.32 1.00
8/6/2022 13211 30300 19,510.00 2,750.00 7.09 1.00
8/6/2022 13212 30273 21,910.00 2,750.00 7.97 1.00
8/6/2022 13213 30243 17,560.00 2,750.00 6.39 1.00
8/6/2022 13214 30294 16,370.00 2,750.00 5.95 1.00
8/6/2022 13215 30296 17,570.00 2,750.00 6.39 1.00
8/6/2022 13216 30562 16,980.00 2,750.00 6.17 1.00
8/6/2022 13217 30303 16,140.00 2,750.00 5.87 1.00
8/6/2022 13218 30300 17,490.00 2,750.00 6.36 1.00
8/6/2022 13219 30273 17,510.00 2,750.00 6.37 1.00
8/6/2022 13220 30299 19,430.00 2,750.00 7.07 1.00
8/6/2022 13221 30296 15,040.00 2,750.00 5.47 1.00
8/6/2022 13222 30243 16,190.00 2,750.00 5.89 1.00
8/6/2022 13223 30294 18,720.00 2,750.00 6.81 1.00
TOTALES 1,334,030.00 206,250.00 485.12 75.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 358 30-358


Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 276 30-276
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
8/8/2022 13273 30300 15,350.00 2,750.00 5.58 1.00
8/8/2022 13274 30303 13,240.00 2,750.00 4.81 1.00
8/8/2022 13275 30365 22,220.00 2,750.00 8.08 1.00
8/8/2022 13276 30273 16,240.00 2,750.00 5.91 1.00
8/8/2022 13277 30297 21,270.00 2,750.00 7.73 1.00
8/8/2022 13278 30275 21,450.00 2,750.00 7.80 1.00
8/8/2022 13279 30810 11,460.00 2,750.00 4.17 1.00
8/8/2022 13280 30807 17,670.00 2,750.00 6.43 1.00
8/8/2022 13281 30360 18,950.00 2,750.00 6.89 1.00
8/8/2022 13282 30358 20,290.00 2,750.00 7.38 1.00
8/8/2022 13283 30299 18,130.00 2,750.00 6.59 1.00
8/8/2022 13284 30296 17,850.00 2,750.00 6.49 1.00
8/8/2022 13285 30438 15,340.00 2,750.00 5.58 1.00
8/8/2022 13286 30373 15,750.00 2,750.00 5.73 1.00
8/8/2022 13287 30443 15,000.00 2,750.00 5.45 1.00
8/8/2022 13288 30125 11,190.00 2,750.00 4.07 1.00
8/8/2022 13289 30366 18,570.00 2,750.00 6.75 1.00
8/8/2022 13290 30562 12,210.00 2,750.00 4.44 1.00
8/8/2022 13291 30144 15,230.00 2,750.00 5.54 1.00
8/8/2022 13292 30493 20,590.00 2,750.00 7.49 1.00
8/8/2022 13293 30153 19,200.00 2,750.00 6.98 1.00
8/8/2022 13294 30243 19,850.00 2,750.00 7.22 1.00
8/8/2022 13295 30448 14,510.00 2,750.00 5.28 1.00
8/8/2022 13296 30474 19,160.00 2,750.00 6.97 1.00
8/8/2022 13297 30730 9,660.00 2,750.00 3.51 1.00
8/8/2022 13298 30364 16,850.00 2,750.00 6.13 1.00
8/8/2022 13299 30303 14,590.00 2,750.00 5.31 1.00
8/8/2022 13300 30810 17,060.00 2,750.00 6.20 1.00
8/8/2022 13301 30807 14,880.00 2,750.00 5.41 1.00
8/8/2022 13302 30297 18,750.00 2,750.00 6.82 1.00
8/8/2022 13303 30300 14,920.00 2,750.00 5.43 1.00
8/8/2022 13304 30365 19,480.00 2,750.00 7.08 1.00
8/8/2022 13305 30275 15,550.00 2,750.00 5.65 1.00
8/8/2022 13306 30273 15,960.00 2,750.00 5.80 1.00
8/8/2022 13307 30360 17,430.00 2,750.00 6.34 1.00
8/8/2022 13308 30358 19,890.00 2,750.00 7.23 1.00
8/8/2022 13309 30294 15,700.00 2,750.00 5.71 1.00
8/8/2022 13310 30438 17,110.00 2,750.00 6.22 1.00
8/8/2022 13311 30443 16,180.00 2,750.00 5.88 1.00
8/8/2022 13312 30373 15,890.00 2,750.00 5.78 1.00
8/8/2022 13313 30125 10,170.00 2,750.00 3.70 1.00
8/8/2022 13314 30366 12,520.00 2,750.00 4.55 1.00
8/8/2022 13315 30299 21,330.00 2,750.00 7.76 1.00
8/8/2022 13316 30243 12,660.00 2,750.00 4.60 1.00
8/8/2022 13317 3096 13,780.00 2,750.00 5.01 1.00
8/8/2022 13318 30153 13,110.00 2,750.00 4.77 1.00
8/8/2022 13319 30164 13,800.00 2,750.00 5.02 1.00
8/8/2022 13320 30364 22,520.00 2,750.00 8.19 1.00
8/8/2022 13321 30296 200.00 2,750.00 0.07 1.00
8/8/2022 13322 30303 12,870.00 2,750.00 4.68 1.00
8/8/2022 13323 30448 16,130.00 2,750.00 5.87 1.00
8/8/2022 13324 30300 13,820.00 2,750.00 5.03 1.00
8/8/2022 13325 30144 13,630.00 2,750.00 4.96 1.00
8/8/2022 13326 30730 13,810.00 2,750.00 5.02 1.00
8/8/2022 13327 30562 15,610.00 2,750.00 5.68 1.00
8/8/2022 13328 30365 15,440.00 2,750.00 5.61 1.00
8/8/2022 13329 30358 19,110.00 2,750.00 6.95 1.00
8/8/2022 13330 30273 11,400.00 2,750.00 4.15 1.00
8/8/2022 13331 30275 19,090.00 2,750.00 6.94 1.00
8/8/2022 13332 30345 16,570.00 2,750.00 6.03 1.00
8/8/2022 13333 30360 21,070.00 2,750.00 7.66 1.00
8/8/2022 13334 30274 22,970.00 2,750.00 8.35 1.00
8/8/2022 13335 30299 16,240.00 2,750.00 5.91 1.00
8/8/2022 13336 3096 16,500.00 2,750.00 6.00 1.00
8/8/2022 13337 30164 6,020.00 2,750.00 2.19 1.00
8/8/2022 13338 30193 14,340.00 2,750.00 5.21 1.00
8/8/2022 13339 30275 17,740.00 2,750.00 6.45 1.00
8/8/2022 13340 30243 13,660.00 2,750.00 4.97 1.00
8/8/2022 13341 30807 12,250.00 2,750.00 4.45 1.00
8/8/2022 13342 30153 17,520.00 2,750.00 6.37 1.00
8/8/2022 13343 30493 14,140.00 2,750.00 5.14 1.00
8/8/2022 13344 30303 14,650.00 2,750.00 5.33 1.00
8/8/2022 13345 30364 20,880.00 2,750.00 7.59 1.00
8/8/2022 13346 30373 11,000.00 2,750.00 4.00 1.00
8/8/2022 13347 30810 15,530.00 2,750.00 5.65 1.00
8/8/2022 13348 30443 14,710.00 2,750.00 5.35 1.00
8/8/2022 13349 30448 17,130.00 2,750.00 6.23 1.00
8/8/2022 13350 30300 11,860.00 2,750.00 4.31 1.00
8/8/2022 13351 30125 14,640.00 2,750.00 5.32 1.00
8/8/2022 13352 30273 14,770.00 2,750.00 5.37 1.00
8/8/2022 13353 30365 20,890.00 2,750.00 7.60 1.00
8/8/2022 13354 30366 20,980.00 2,750.00 7.63 1.00
8/8/2022 13355 30730 17,880.00 2,750.00 6.50 1.00
8/8/2022 13356 30294 14,260.00 2,750.00 5.19 1.00
8/8/2022 13357 30562 14,190.00 2,750.00 5.16 1.00
TOTALES 1,354,010.00 233,750.00 492.38 85.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 300 30-300


Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 810 30-810
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 443 30-443
Bolon CAMBIO LINEA WAWA 30 - 125 30-125
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 474 30-474
Bolon CAMBIO LINEA WAWA 30 - 730 30-730
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 810 30-810
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 438 30-438
Bolon CAMBIO LINEA WAWA 30 - 443 30-443
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 125 30-125
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 96 30-96
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 144 30-144
Bolon CAMBIO LINEA WAWA 30 - 730 30-730
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 345 30-345
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 96 30-96
Bolon CAMBIO LINEA WAWA 30 - 164 30-164
Bolon CAMBIO LINEA WAWA 30 - 193 30-193
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 807 30-807
Bolon CAMBIO LINEA WAWA 30 - 153 30-153
Bolon CAMBIO LINEA WAWA 30 - 493 30-493
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 810 30-810
Bolon CAMBIO LINEA WAWA 30 - 443 30-443
Bolon CAMBIO LINEA WAWA 30 - 448 30-448
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 125 30-125
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 730 30-730
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
8/9/2022 13358 30364 32,890.00 2,750.00 11.96 1.00
8/9/2022 13359 30299 29,360.00 2,750.00 10.68 1.00
8/9/2022 13360 30373 19,520.00 2,750.00 7.10 1.00
8/9/2022 13361 30300 18,090.00 2,750.00 6.58 1.00
8/9/2022 13362 30303 17,440.00 2,750.00 6.34 1.00
8/9/2022 13363 30274 24,140.00 2,750.00 8.78 1.00
8/9/2022 13364 30275 20,820.00 2,750.00 7.57 1.00
8/9/2022 13365 30294 21,030.00 2,750.00 7.65 1.00
8/9/2022 13366 30358 27,250.00 2,750.00 9.91 1.00
8/9/2022 13367 30365 21,790.00 2,750.00 7.92 1.00
8/9/2022 13368 30243 28,600.00 2,750.00 10.40 1.00
8/9/2022 13369 30296 21,530.00 2,750.00 7.83 1.00
8/9/2022 13370 30360 22,980.00 2,750.00 8.36 1.00
8/9/2022 13371 30297 20,300.00 2,750.00 7.38 1.00
8/9/2022 13372 30366 14,420.00 2,750.00 5.24 1.00
8/9/2022 13373 30562 18,470.00 2,750.00 6.72 1.00
8/9/2022 13374 30273 16,750.00 2,750.00 6.09 1.00
8/9/2022 13375 30300 11,120.00 2,750.00 4.04 1.00
8/9/2022 13376 30364 18,120.00 2,750.00 6.59 1.00
8/9/2022 13377 30303 13,970.00 2,750.00 5.08 1.00
8/9/2022 13378 30299 16,560.00 2,750.00 6.02 1.00
8/9/2022 13379 30358 22,140.00 2,750.00 8.05 1.00
8/9/2022 13380 30294 16,170.00 2,750.00 5.88 1.00
8/9/2022 13381 30360 17,620.00 2,750.00 6.41 1.00
8/9/2022 13382 30275 16,140.00 2,750.00 5.87 1.00
8/9/2022 13383 30296 14,480.00 2,750.00 5.27 1.00
8/9/2022 13384 30243 13,030.00 2,750.00 4.74 1.00
8/9/2022 13385 30297 17,980.00 2,750.00 6.54 1.00
8/9/2022 13386 30365 13,970.00 2,750.00 5.08 1.00
8/9/2022 13387 30366 12,990.00 2,750.00 4.72 1.00
8/9/2022 13388 2,750.00 0.00 1.00
8/9/2022 13389 30364 88,610.00 2,750.00 32.22 1.00
8/9/2022 13390 30300 19,540.00 2,750.00 7.11 1.00
8/9/2022 13391 30273 18,540.00 2,750.00 6.74 1.00
8/9/2022 13392 30358 31,310.00 2,750.00 11.39 1.00
8/9/2022 13393 30274 18,210.00 2,750.00 6.62 1.00
8/9/2022 13394 30360 56,420.00 2,750.00 20.52 1.00
8/9/2022 13395 2,750.00 0.00 1.00
8/9/2022 13396 30294 82,890.00 2,750.00 30.14 1.00
8/9/2022 13397 30364 190.00 2,750.00 0.07 1.00
TOTALES 895,380.00 110,000.00 325.61 40.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 364 30-364


Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 373 30-373
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 30-
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 303 30-303
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
8/10/2022 13405 30358 39,480.00 2,750.00 14.36 1.00
8/10/2022 13406 30360 42,930.00 2,750.00 15.61 1.00
8/10/2022 13407 30366 69,530.00 2,750.00 25.28 1.00
8/10/2022 13408 2,750.00 0.00 1.00
8/10/2022 13409 30297 550.00 2,750.00 0.20 1.00
8/10/2022 13410 2,750.00 0.00 1.00
8/10/2022 13411 30275 57,820.00 2,750.00 21.03 1.00
8/10/2022 13412 30273 65,510.00 2,750.00 23.82 1.00
8/10/2022 13413 30299 35,820.00 2,750.00 13.03 1.00
8/10/2022 13414 2,750.00 0.00 1.00
8/10/2022 13415 2,750.00 0.00 1.00
8/10/2022 13416 2,750.00 0.00 1.00
8/10/2022 13417 30365 29,560.00 2,750.00 10.75 1.00
8/10/2022 13418 2,750.00 0.00 1.00
8/10/2022 13419 2,750.00 0.00 1.00
8/10/2022 13420 2,750.00 0.00 1.00
8/10/2022 13421 2,750.00 0.00 1.00
8/10/2022 13422 2,750.00 0.00 1.00
8/10/2022 13423 30275 61,980.00 2,750.00 22.54 1.00
8/10/2022 13424 30294 72,630.00 2,750.00 26.41 1.00
8/10/2022 13425 2,750.00 0.00 1.00
8/10/2022 13426 2,750.00 0.00 1.00
8/10/2022 13427 30360 81,850.00 2,750.00 29.76 1.00
8/10/2022 13428 2,750.00 0.00 1.00
8/10/2022 13429 30274 24,760.00 2,750.00 9.00 1.00
8/10/2022 13430 30275 24,250.00 2,750.00 8.82 1.00
8/10/2022 13431 2,750.00 0.00 1.00
8/10/2022 13432 30243 18,290.00 2,750.00 6.65 1.00
8/10/2022 13433 2,750.00 0.00 1.00
8/10/2022 13434 30364 25,430.00 2,750.00 9.25 1.00
8/10/2022 13435 30294 33,850.00 2,750.00 12.31 1.00
8/10/2022 13436 30358 51,310.00 2,750.00 18.66 1.00
8/10/2022 13437 30360 7,330.00 2,750.00 2.67 1.00
TOTALES 742,880.00 90,750.00 270.15 33.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 358 30-358


Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 30-
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 275 30-275
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
8/11/2022 13438 2,750.00 0.00 1.00
8/11/2022 13439 30364 18,660.00 2,750.00 6.79 1.00
8/11/2022 13440 30365 57,410.00 2,750.00 20.88 1.00
8/11/2022 13441 30358 12,370.00 2,750.00 4.50 1.00
8/11/2022 13442 30296 40,160.00 2,750.00 14.60 1.00
8/11/2022 13443 30300 88,550.00 2,750.00 32.20 1.00
8/11/2022 13444 30273 87,090.00 2,750.00 31.67 1.00
8/11/2022 13445 30184 10,460.00 2,750.00 3.80 1.00
8/11/2022 13446 30274 28,240.00 2,750.00 10.27 1.00
8/11/2022 13447 30366 89,020.00 2,750.00 32.37 1.00
8/11/2022 13448 30297 5,850.00 2,750.00 2.13 1.00
8/11/2022 13449 30365 65,760.00 2,750.00 23.91 1.00
8/11/2022 13450 30294 131,440.00 2,750.00 47.80 1.00
8/11/2022 13451 30358 19,160.00 2,750.00 6.97 1.00
8/11/2022 13452 30364 89,620.00 2,750.00 32.59 1.00
8/11/2022 13453 30300 91,610.00 2,750.00 33.31 1.00
8/11/2022 13454 30273 81,860.00 2,750.00 29.77 1.00
8/11/2022 13455 30184 78,580.00 2,750.00 28.57 1.00
8/11/2022 13456 30297 163,130.00 2,750.00 59.32 1.00
8/11/2022 13457 30299 23,530.00 2,750.00 8.56 1.00
8/11/2022 13458 30274 62,710.00 2,750.00 22.80 1.00
8/11/2022 13459 30365 143,130.00 2,750.00 52.05 1.00
8/11/2022 13460 30358 22,660.00 2,750.00 8.24 1.00
8/11/2022 13461 30294 125,120.00 2,750.00 45.50 1.00
8/11/2022 13462 30364 116,670.00 2,750.00 42.43 1.00
8/11/2022 13463 30360 23,630.00 2,750.00 8.59 1.00
8/11/2022 13464 30243 83,610.00 2,750.00 30.40 1.00
8/11/2022 13465 30562 83,420.00 2,750.00 30.33 1.00
8/11/2022 13466 30300 147,690.00 2,750.00 53.71 1.00
8/11/2022 13467 30296 75,060.00 2,750.00 27.29 1.00
8/11/2022 13468 30297 21,350.00 2,750.00 7.76 1.00
8/11/2022 13469 30299 16,290.00 2,750.00 5.92 1.00
8/11/2022 13470 30366 97,170.00 2,750.00 35.33 1.00
8/11/2022 13471 30273 79,450.00 2,750.00 28.89 1.00
8/11/2022 13472 30184 11,780.00 2,750.00 4.28 1.00
8/11/2022 13473 30274 20,180.00 2,750.00 7.34 1.00
8/11/2022 13474 30365 20,580.00 2,750.00 7.48 1.00
8/11/2022 13475 30358 95,330.00 2,750.00 34.67 1.00
8/11/2022 13476 30294 23,500.00 2,750.00 8.55 1.00
8/11/2022 13477 30243 18,630.00 2,750.00 6.77 1.00
8/11/2022 13478 30300 93,430.00 2,750.00 33.97 1.00
8/11/2022 13479 30562 115,790.00 2,750.00 42.11 1.00
8/11/2022 13480 30296 86,590.00 2,750.00 31.49 1.00
8/11/2022 13481 30358 91,050.00 2,750.00 33.11 1.00
8/11/2022 13482 30297 94,920.00 2,750.00 34.52 1.00
8/11/2022 13483 30299 159,240.00 2,750.00 57.91 1.00
8/11/2022 13484 30366 90,910.00 2,750.00 33.06 1.00
8/11/2022 13485 30184 157,010.00 2,750.00 57.09 1.00
8/11/2022 13486 30365 91,760.00 2,750.00 33.37 1.00
8/11/2022 13487 30273 97,290.00 2,750.00 35.38 1.00
8/11/2022 13488 30294 158,020.00 2,750.00 57.46 1.00
8/11/2022 13489 30243 62,800.00 2,750.00 22.84 1.00
TOTALES 3,769,270.00 143,000.00 1370.65 52.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA - -


Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 360 30-360
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 358 30-358
Bolon CAMBIO LINEA WAWA 30 - 297 30-297
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
8/12/2022 13490 30358 92,630.00 2,750.00 33.68 1.00
8/12/2022 13491 30364 35,260.00 2,750.00 12.82 1.00
8/12/2022 13492 30366 72,910.00 2,750.00 26.51 1.00
8/12/2022 13493 30300 89,520.00 2,750.00 32.55 1.00
8/12/2022 13494 30273 51,140.00 2,750.00 18.60 1.00
8/12/2022 13495 30562 83,900.00 2,750.00 30.51 1.00
8/12/2022 13496 30365 83,110.00 2,750.00 30.22 1.00
8/12/2022 13497 30274 58,130.00 2,750.00 21.14 1.00
8/12/2022 13498 30243 89,490.00 2,750.00 32.54 1.00
8/12/2022 13499 30294 91,800.00 2,750.00 33.38 1.00
8/12/2022 13500 30184 16,660.00 2,750.00 6.06 1.00
8/12/2022 13501 30296 95,410.00 2,750.00 34.69 1.00
8/12/2022 13502 30299 134,480.00 2,750.00 48.90 1.00
TOTALES 994,440.00 35,750.00 361.60 13.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA 30 - 358 30-358


Bolon CAMBIO LINEA WAWA 30 - 364 30-364
Bolon CAMBIO LINEA WAWA 30 - 366 30-366
Bolon CAMBIO LINEA WAWA 30 - 300 30-300
Bolon CAMBIO LINEA WAWA 30 - 273 30-273
Bolon CAMBIO LINEA WAWA 30 - 562 30-562
Bolon CAMBIO LINEA WAWA 30 - 365 30-365
Bolon CAMBIO LINEA WAWA 30 - 274 30-274
Bolon CAMBIO LINEA WAWA 30 - 243 30-243
Bolon CAMBIO LINEA WAWA 30 - 294 30-294
Bolon CAMBIO LINEA WAWA 30 - 184 30-184
Bolon CAMBIO LINEA WAWA 30 - 296 30-296
Bolon CAMBIO LINEA WAWA 30 - 299 30-299
Proyecto:“Supervisión de Obras de Mejoramiento de la Carretera Sahsa – Puerto Cabezas (85.65km)”
Tramo II : 32.5 Km

CONTROL PESAJE BASCULA : 203(10B) Pedraplén t=0.90

Peso Roca
Fecha Boleta Código/Placa Peso Neto (kg) Volumen (m3) Viajes
(kg/m3)
8/13/2022 13503 2,750.00 0.00 1.00
8/13/2022 13504 2,750.00 0.00 1.00
8/13/2022 13505 2,750.00 0.00 1.00
8/13/2022 13506 2,750.00 0.00 1.00
8/13/2022 13507 2,750.00 0.00 1.00
8/13/2022 13508 2,750.00 0.00 1.00
8/13/2022 13509 2,750.00 0.00 1.00
8/13/2022 13510 2,750.00 0.00 1.00
8/13/2022 13511 2,750.00 0.00 1.00
8/13/2022 13512 2,750.00 0.00 1.00
8/13/2022 13513 2,750.00 0.00 1.00
8/13/2022 13514 2,750.00 0.00 1.00
8/13/2022 13515 2,750.00 0.00 1.00
8/13/2022 13516 2,750.00 0.00 1.00
8/13/2022 13517 2,750.00 0.00 1.00
8/13/2022 13518 2,750.00 0.00 1.00
8/13/2022 13519 2,750.00 0.00 1.00
8/13/2022 13520 2,750.00 0.00 1.00
8/13/2022 13521 2,750.00 0.00 1.00
8/13/2022 13522 2,750.00 0.00 1.00
8/13/2022 13523 2,750.00 0.00 1.00
8/13/2022 13524 2,750.00 0.00 1.00
8/13/2022 13525 2,750.00 0.00 1.00
8/13/2022 13526 2,750.00 0.00 1.00
8/13/2022 13527 2,750.00 0.00 1.00
8/13/2022 13528 2,750.00 0.00 1.00
8/13/2022 13529 2,750.00 0.00 1.00
8/13/2022 13530 2,750.00 0.00 1.00
8/13/2022 13531 2,750.00 0.00 1.00
8/13/2022 13532 2,750.00 0.00 1.00
8/13/2022 13533 2,750.00 0.00 1.00
8/13/2022 13534 2,750.00 0.00 1.00
8/13/2022 13535 2,750.00 0.00 1.00
8/13/2022 13536 2,750.00 0.00 1.00
8/13/2022 13537 2,750.00 0.00 1.00
8/13/2022 13538 2,750.00 0.00 1.00
8/13/2022 13539 2,750.00 0.00 1.00
8/13/2022 13540 2,750.00 0.00 1.00
8/13/2022 13541 2,750.00 0.00 1.00
8/13/2022 13542 2,750.00 0.00 1.00
8/13/2022 13543 2,750.00 0.00 1.00
8/13/2022 13544 2,750.00 0.00 1.00
8/13/2022 13545 2,750.00 0.00 1.00
8/13/2022 13546 2,750.00 0.00 1.00
8/13/2022 13547 2,750.00 0.00 1.00
8/13/2022 13548 2,750.00 0.00 1.00
8/13/2022 13549 2,750.00 0.00 1.00
8/13/2022 13550 2,750.00 0.00 1.00
8/13/2022 13551 2,750.00 0.00 1.00
8/13/2022 13552 2,750.00 0.00 1.00
8/13/2022 13553 2,750.00 0.00 1.00
8/13/2022 13554 2,750.00 0.00 1.00
8/13/2022 13555 2,750.00 0.00 1.00
8/13/2022 13556 2,750.00 0.00 1.00
8/13/2022 13557 2,750.00 0.00 1.00
8/13/2022 13558 2,750.00 0.00 1.00
8/13/2022 13559 2,750.00 0.00 1.00
8/13/2022 13560 2,750.00 0.00 1.00
8/13/2022 13561 2,750.00 0.00 1.00
8/13/2022 13562 2,750.00 0.00 1.00
8/13/2022 13563 2,750.00 0.00 1.00
8/13/2022 13564 2,750.00 0.00 1.00
8/13/2022 13565 2,750.00 0.00 1.00
8/13/2022 13566 2,750.00 0.00 1.00
8/13/2022 13567 2,750.00 0.00 1.00
8/13/2022 13568 2,750.00 0.00 1.00
8/13/2022 13569 2,750.00 0.00 1.00
8/13/2022 13570 2,750.00 0.00 1.00
8/13/2022 13571 2,750.00 0.00 1.00
8/13/2022 13572 2,750.00 0.00 1.00
8/13/2022 13573 2,750.00 0.00 1.00
8/13/2022 13574 2,750.00 0.00 1.00
8/13/2022 13575 2,750.00 0.00 1.00
8/13/2022 13576 2,750.00 0.00 1.00
8/13/2022 13577 2,750.00 0.00 1.00
8/13/2022 13578 2,750.00 0.00 1.00
8/13/2022 13579 2,750.00 0.00 1.00
8/13/2022 13580 2,750.00 0.00 1.00
8/13/2022 13581 2,750.00 0.00 1.00
8/13/2022 13582 2,750.00 0.00 1.00
8/13/2022 13583 2,750.00 0.00 1.00
8/13/2022 13584 2,750.00 0.00 1.00
8/13/2022 13585 2,750.00 0.00 1.00
8/13/2022 13586 2,750.00 0.00 1.00
8/13/2022 13587 2,750.00 0.00 1.00
TOTALES 0.00 233,750.00 0.00 85.00
Puerto Cabezas (85.65km)”

n t=0.90

Material Estac. Destino

Bolon CAMBIO LINEA WAWA - -


Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -
Bolon CAMBIO LINEA WAWA - -