ADICIONAL N02 DEDUCTIVO VINCULANTE N02

PARTIDAS

1 COLOCADO DE MALLA OLIMPICA SOBRE REJA METALICA


SOLDADURA 1/8"
1.1
HOJA DE SIERRA
1.2
LIJA DE FIERRO # 80
1.3
TARRAJEO CON CEMENTO ARENA Y CEMENTO MEZCLA 1:5 (INTERIOR Y EXTERIOR)
2
3 PINTURA LATEX EN EXTERIOR 2 MANOS DEL MURO
LIJA
4.1
IMPRIMANTE
4.2
PINTURA LATEX EXTERIORES
4.3

5 PINTURA EN ESTRUCTURA METALICAS


5.1 THINER STANDARD
5.2 PINTURA ANTICORROSIVA
5.3 PINTURA ESMALTE

COSTO DIRECTO
GASTOS GENERALES
GASTOS GENERA VARIABLES
UTILIDAD
SUB TOTAL
IGV

TOTAL

ALAMBRE DE PUA COSTO UNITARIO


UND METRADO P.U PARCIAL TOTAL

M2 51.00 236.2 S/ 12,046.20 S/ 12,046.20

2.05 1.20 3.25

M2 42.08 27.76 S/ 1,168.00 S/ 1,168.00


M2 42.08 12.97 S/ 545.71 S/ 545.71
und 0.77
gln 18.64
gln 66.95
M2 51.00 24.92 S/ 1,270.92 S/ 1,270.92
GLN 42.075 29.58 71.655
GLN 42.075 73.45 115.525
GLN 42.075 56.46 98.535

S/ 15,030.83

S/ 15,030.83
0.79% 118.7435945
16.55 2487.603151
10% 1503.083475
S/ 19,140.26
18% S/ 3,445.25

S/ 22,585.51
1487.44 267.7392

0.18 0
0.1 0 0
0.1655 0 1487.44 267.7392
0.0079 0
37.7
788.74
476.6