MATERIA:COSTOS Y PRESUPUESTOS
ING. ALBERTO ROMAN BONILLA VILLANUEVA
FECHA: 11 DE DICIEMBRE 2015
CATALAGO DE PRECIOS
OBRA NEGRA
INSTALACION HIDRAULICA
IMPORTE IMPORTE IMPORTE
CODIGO CONCEPTO UNIDAD
MERCANTIL CERAMAT THE HOME DEPOT
CTP016 REDUCC 1/2 *3/4 CAMPANA COBRE PIEZA $ 3.85 $ 4.00 $ 4.50
CTP017 REDUCC 1/2 *1 BUSHING COBRE PIEZA $ 8.50 $ 10.00 $ 9.20
CTP018 REDUCC 3/4 *1 BUSHING COBRE PIEZA $ 8.80 $ 9.00 $ 9.30
CTP019 EXT COFLEX P/FRE ALUMINIO 22" A PIEZA $ 17.50 $ 18.00 $ 18.86
CTP020 EXT COFLEX P/LAV ALUMINIO 16" A PIEZA $ 14.50 $ 17.00 $ 18.86
CTP021 CODO COBRE 3/4 * 90º PIEZA $ 8.50 $ 8.76 $ 7.98
CTP022 CODO COBRE 1* 90º PIEZA $ 16.80 $ 17.00 $ 16.23
CTP023 CODO COBRE 1/2* 90º PIEZA $ 5.90 $ 5.78 $ 4.98
CTP024 TEE SENCILLA PVC 2 PIEZA $ 6.00 $ 5.90 $ 6.24
CTP025 TEE SENCILLA PVC 3 PIEZA $ 8.00 $ 8.30 $ 8.00
CTP026 TEE SENCILLA PVC 4 PIEZA $ 12.50 $ 12.00 $ 12.50
CTP027 TUBO COBRE 1" M. L. $ 97.17 $ 80.91 $ 100.94
CTP028 TUBO DE COBRE 1/2" M. L. $ 31.66 $ 36.36 $ 43.46
CTP029 TEE DE COBRE DE 1/2" PIEZA $ 4.40 $ 4.00 $ 3.65
CTP030 TEE DE COBRE DE 3/4" PIEZA $ 13.20 $ 15.00 $ 13.89
CTP031 TEE DE COBRE DE 1" PIEZA $ 41.80 $ 40.00 $ 40.98
CTP032 TUERCA UNION SOLDABLE DE 3/4" PIEZA $ 28.05 $ 28.00 $ 28.50
CTP033 TUERCA UNION SOLDABLE DE 1" PIEZA $ 57.20 $ 56.98 $ 57.36
CTP034 VALVULA DE COMPUERTA ROSCABLE 1/2" PIEZA $ 28.00 $ 29.00 $ 28.55
CTP035 VALVULA COMPUERTA ROSCABLE 3/4" PIEZA $ 35.50 $ 35.00 $ 35.66
CTP036 COPLE DE COBRE 1/2" PIEZA $ 3.50 $ 4.00 $ 3.99
CTP037 TUBO GALVANIZADO CB 1 1/4" M. L. $ 148.16 $ 125.00 $ 134.00
CTP038 TUBO PVC H 1" M. L. $ 7.50 $ 8.00 $ 7.87
CTP039 TUBO PVC H 1/2" M. L. $ 5.00 $ 5.30 $ 5.80
CTP040 TUBO PVC H 3/4" M. L. $ 8.40 $ 7.80 $ 7.99
CTP041 CODO PIPA DE COBRE 1/2" PIEZA $ 18.50 $ 19.00 $ 18.70
CTP042 CODO PVC 2 * 90 PIEZA $ 9.50 $ 8.99 $ 10.00
CTP043 CODO PVC 3 * 90 PIEZA $ 12.00 $ 12.30 $ 12.70
CTP044 CODO PVC 4 * 90 PIEZA $ 16.00 $ 15.80 $ 16.20
CTP045 VALVULA DE COMPUERTA SOLDABLE 1/2" PIEZA $ 27.50 $ 29.00 $ 29.20
CONSIDERACIONES
ESPECIDICACIONES TECNICAS
REVOLVEDORA
GASOLINA 8 0.19 2000 1600 0.0751 $20,390.00 0.06 0.8
SIPSA
GASOLINA VIBRADOR VAISI 4 0.15 2000 1650 0.0751 $9,558.00 0.04 0.75
LECHADA
CEMENTO GRIS (M3)
CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
OBN008 CEMENTO GRIS TON 1.339 $ 2,362.00 $ 3,162.72
000H2O AGUA M3 1.17 $ 50.00 $ 58.50
TOTAL = $ 3,221.22
MORTEROS
CEMENTO, ARENA 1:5 (M3)
CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
OBN008 CEMENTO GRIS TON 0.360 $ 2,362.00 $ 850.32
MTAR ARENA M3 1.150 $ 216.66 $ 249.16
000H2O AGUA M3 0.261 $ 50.00 $ 13.05
TOTAL = $ 1,112.53
CONCRETOS
F´C 50 KG/CM2 (M3)
CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
OBN008 CEMENTO GRIS TON 0.177 $ 2,362.00 $ 418.07
MTAR ARENA M3 0.467 $ 216.66 $ 101.18
GRAVA 1´ M3 0.701 $ 233.33 $ 163.56
000H2O AGUA M3 0.202 $ 50.00 $ 10.10
TOTAL= $ 692.92
CIBRAS
COMÚN EN CIMENTACIÓN (M2)
CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
MADERA DE PINO P.T 5 $ 10.79 $ 53.96
SEPARADORES KG 0.6 $ 11.00 $ 6.60
CLAVO KG 0.075 $ 31.08 $ 2.33
ALAMBRE KG 0.165 $ 12.07 $ 1.99
DIESEL LT 1 $ 14.20 $ 14.20
TOTAL= $ 79.08
REFUERZO
ALAMBRON 1/4´´ (KG)
CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
ALAMBRON 1/4´´ KG 1.1 $ 11.64 $ 12.80
ALAMBRE KG 0.03 $ 12.07 $ 0.36
TOTAL= $ 13.17
CATALAGO DE CONCEPTOS
CODIGO CONCEPTO UNIDAD
PRELIMINARES
CIMENTACION
PLANTILLA DE CONCRETO SIMPLE CON F'C=100 KG/CM2 CON ESPESOR PROMEDIO DE 5 CM
DE ESPESOR ELABORADO EN OBRA CON MAQUINA REVOLVEDORA; INCLUYE MATERIALES,
CIM001 M2
MANO DE OBRA EN ELABORACION, COLOCADO, CIMBRADO, DESCIMBRADO, HERRAMIENTA
Y/O EQUIPO.
CIM003 KG
CIM004 ACERO EN CIMENTACION DE F'Y= 4500 KG/CM2 INCLUYE SUMINISTRO, HABILITADO Y ARMADO KG
CIM005 M2
CIMBRA PARA CIMENTACION CON MADERA DE PINO DE 1RA ACABADO COMÚN INCLUYE
CIM006 M2
CIMBRADO Y DESCIMBRADO.
CIM008 ML
FIRME PARA PISO DE 15 CM DE ESPESOR PROMEDIO CON CONCRETO F'C= 150 KG/CM2 CON
AGREGADO MÁXIMO 3/4" HECHO EN OBRA CON MAQUINA REVOLVEDORA INCLUYE
CIM009 M2
ACARREOS, MATERIALES, MANO DE OBRA EN ELABORACION, COLOCADO, HERRAMIENTA Y/O
EQUIPO.
CIM010 SUPERESTRUCTURA
CADENA TIPO CC Y CE DE 10X20-4 CON CONCRETO F'C= 200 KG/CM2 HECHO EN OBRA CON
MAQUINA REVOLVEDORA TAMAÑO MÁXIMO DE AGREGADO DE 3/4", ACABADO COMUN,
SUP001 ML
INCLUYE ACARREOS, MATERIALES, MANO DE OBRA EN ELABORACION, COLOCADO,
CIMBRADO, DESCIMBRADO, VIBRADO, HERRAMIENTA Y/O EQUIPO..
SUP003
CIMBRA EN LOSA DE AZOTEA, CON MADERA DE 1RA Y ACABADO COMÚN EN LOSAS, INCLUYE
SUP005 P.T
MATERIALES, MANO DE OBRA, HERRAMIENTA Y/O EQUIPO.
CONCRETO EN LOSA DE AZOTEA F'C= 200 KG/CM2 HECHO EN OBRA CON MAQUINA
REVOLVEDORA TAMAÑO MÁXIMO DE AGREGADO DE 3/4" INCLUYE MATERIALES, MANO DE
SUP007 M3
OBRA EN ELABORACION, COLOCADO,CIMBRADO,DESCIMBRADO, VIBRADO, HERRAMIENTA Y/O
EQUIPO
INSTALACION ELECTRICA
SALIDA PARA SEÑAL DE T.V. EN CAJA DE LAMINA GALVANIZADA CON TUBO CONDUIT DE
FIERRO GALVANIZADO PARED DELGADA; INCLUYE: ACARREOS, CONECTORES, COPLES,
IE012 CHALUPA GALVANIZADA, CABLES TV, CHASIS Y SOBRETAPA DE ALUMINIO, PRUEBAS, SAL
CONEXIONES, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
SALIDA PARA TELEFONO EN CAJA DE LAMINA GALVANIZADA CON TUBO CONDUIT DE FIERRO
GALVANIZADO PARED DELGADA; INCLUYE: ACARREOS, CONECTORES, COPLES, CHALUPA
IE013 GALVANIZADA, CABLES DE 2 VIAS, CHASIS Y SOBRETAPA DE ALUMINIO, PRUEBAS, SAL
CONEXIONES, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
INSTALACION HIDRAULICA
SUMINISTRO Y COLOCACION DE REGADERA HELVEX No. 100, CON DOS LLAVES O SIMILAR;
INCLUYE: ACARREO, PRUEBAS, CONEXIONES, ENSAMBLE PARA MEZCLADORA, EMPOTRADO,
IH003 PZA
HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.
SALIDA MUEBLE SANITARIO CON TUBO HIDRÁULICO COBRE TIPO "M" 13mm.; INCLUYE:
VALVULA DE PASO Y VÁLVULA DE CONTROL GENERAL, RAMALEO CON TUBO DE COBRE DE 13
IH010 A 100 MM DE DIÁMETRO, CONEXIONES, ALIMENTACIÓN Y DESCARGA DE TINACO, ACARREO, SAL
PRUEBA HIDROSTÁTICA, SOLDADURA, HERRAMIENTA, MANO DE OBRA Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION.
SALIDA DE LAVABO CON TUBO HIDRÁULICO DE COBRE TIPO " M" Y ACCESORIOS EN 13mm;
INCLUYE:CONEXIONES, RAMALEO, CONEXIONES A BAJADA DE AGUAS NEGRAS,
IH011 SAL
HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.
SALIDA DE REGADERA CON TUBO HIDRÁULICO DE COBRE TIPO " M" Y ACCESORIOS EN 13mm;
INCLUYE:CONEXIONES, RAMALEO, CONEXIONES A BAJADA DE AGUAS NEGRAS,
IH012 SAL
HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.
SALIDA DE LLAVE DE NARIZ EN EXTERIOR CON TUBO HIDRÁULICO DE COBRE TIPO " M" Y
IH013 ACCESORIOS EN 13mm; INCLUYE:CONEXIONES, RAMALEO, HERRAMIENTA MENOR, MANO DE SAL
OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.
INSTALACION SANITARIA
SUMISTRO Y COLOCACION DE SALIDA LABAVO CON TUBO DE PVC LISO SANITARIO DE 2" Y
DEMAS ACCESORIOS, INLCUYE: ACARREOS, CONEXIONES, RAMALEO CON TUBO DE PVC,
IS005 CONEXIONES A BAJADA DE AGUAS NEGRAS, TENDIDO, JUNTEO, PEGAMENTO DE PVC, SAL
ALINEACIÓN, PRUEBAS, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION.
IS011 ACABADOS
SUMINISTRO Y COLOCACION DE AZULEJO LISO EN MURO DE 20x30 CM, ASENTADO CON PEGA
AZULEJO Y LECHADEADO CON CEMENTO BLANCO; INCLUYE: CORTES, AJUSTES,
ACA004 M2
DESPERDICIOS, NIVELACIÓN, MANO DE OBRA, LIMPIEZA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
ACA005 M2
ACA006 M2
ACA011 M2
MATERIALES
MANO DE OBRA
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $0.00
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD S.R IMPORTE
1 1 PEON J 0.400 $290.80 $116.32
2 1 MAESTRO DE OBRA % 0.1 $116.32 $11.63
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $127.95
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 CONCRETO F´C=100 KG/CM2 M3 0.063 $692.92 $43.65
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $43.65
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD S.R IMPORTE
1 1 PEON J 0.059 $290.80 $17.11
2 1 OFICIAL DE ALBAÑILERIA J 0.059 $478.97 $28.17
3 1 MAESTRO DE OBRA % 0.1 $45.28 $4.53
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $49.81
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
CONCRETO F'C=200 KG/CM2 CON 5% DE DESPERDICIO M3 1.05 $1,078.32 $1,132.24
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $1,132.24
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
1 ELABORACION DE CONCRETO $0.00
5 PEONES J 0.35 $290.80 $101.78
COLOCACIÓN $0.00
2 1PEON J 0.067 $290.80 $19.39
3 1 OFICIAL DE ALBAÑILERIA J 0.067 $478.97 $31.93
4 1 MAESTRO DE OBRA % 0.1 $153.10 $15.31
$0.00
$0.00
$0.00
$0.00
TOTAL= $168.41
UNIDAD: KG
ACERO EN CIMENTACION DE F'Y= 4500 KG/CM2 INCLUYE SUMINISTRO,
HABILITADO Y ARMADO
RENDIMIENTO: 75
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 VARILLA #3 KG 1 $12.46 $12.46
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $12.46
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
1 1 OFICIAL FIERRERO J 0.0133 $478.9680 $6.39
2 I PEON J 0.0133 $290.80 $3.88
3 I MAESTRO DE OBRA % 0.1 $10.26 $1.03
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $11.29
UNIDAD: M2
CIMBRA PARA CIMENTACION CON MADERA DE PINO DE 1RA ACABADO COMÚN
INCLUYE CIMBRADO Y DESCIMBRADO.
RENDIMIENTO: 6
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 MADERA PARA CIMBRA COMÚN EN CIMENTACION M2 0.6 $79.08 $47.45
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $47.45
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
1 I CARPINTERO DE OBRA NEGRA J 0.16666667 $478.97 $79.83
2 1 PEON J 0.16666667 $0.00 $0.00
3 MAESTRO DE OBRA NEGRA % 0.1 $79.83 $7.98
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $87.81
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 TABICON CON 5 % DESPERDICIO PZA 52.5 $3.00 $157.50
2 MORTERO 1:3:12 CON 10% DESPERDICIO M3 0.01584 $627.45 $9.94
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $167.44
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
1 1 OFICIAL DE ALBAÑILERIA J 0.125 $478.97 $59.87
2 1 PEON J 0.125 $0.00 $0.00
3 MAESTRO DE OBRA % 0.1 $59.87 $5.99
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $65.86
CADENA TIPO CC Y CE DE 10X20-4 CON CONCRETO F'C= 200 KG/CM2 HECHO EN UNIDAD: ML
OBRA CON MAQUINA REVOLVEDORA TAMAÑO MÁXIMO DE AGREGADO DE 3/4",
ACABADO COMUN, INCLUYE ACARREOS, MATERIALES, MANO DE OBRA EN
ELABORACION, COLOCADO, CIMBRADO, DESCIMBRADO, VIBRADO, RENDIMIENTO: 8
HERRAMIENTA Y/O EQUIPO..
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 CONCRETO F´C = 150 kg/cm2 CON 5% DESPERDICIO M3 0.0236 $1,005.53 $23.73
2 ACERO REFUERZO #3 KG 2.24 $12.46 $27.92
3 ALAMBRON #2 KG 0.6696 $13.17 $8.82
4 CIMBRA COMÚN EN CADENAS M2 0.3 $53.33 $16.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $76.46
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
1 ¨ELABORACION DEL CONCRETO REND 10M3/J $0.00
2 5 PEONES J 0.0118 $0.00 $0.00
3 ¨CIMBRADO, COLDADO Y ARMADO $0.00
4 I OFICIAL DE ALBAÑILERIA J 0.125 $478.97 $59.87
5 I PEON J 0.125 $0.00 $0.00
$0.00
6 MAESTRO DE OBRA % 0.1 $59.87 $5.99
$0.00
$0.00
$0.00
TOTAL= $65.86
FIRME PARA PISO DE 15 CM DE ESPESOR PROMEDIO CON CONCRETO F'C= 150 UNIDAD: M2
KG/CM2 CON AGREGADO MÁXIMO 3/4" HECHO EN OBRA CON MAQUINA
REVOLVEDORA INCLUYE ACARREOS, MATERIALES, MANO DE OBRA EN
RENDIMIENTO: 10
ELABORACION, COLOCADO, HERRAMIENTA Y/O EQUIPO.
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 CONCRETO F´C = 150 KG/CM2 CON 10 M3 0.165 $1,005.53 $165.91
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $165.91
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
¨ELABORACION DEL CONCRETO F´C =150 KG/CM2 $0.00
1 4 PEONES CON REND DE 10 M3/J C/U J 0.0825 $290.80 $23.99
$0.00
¨FIRME DE CONCRETO DE 15 CM DE ESPESOR PROMEDIO $0.00
2 1 OFICIAL DE ALBAÑILERIA J 0.1 $478.97 $47.90
3 2 PEONES J 0.2 $290.80 $58.16
$0.00
4 MAESTRO DE OBRA % 0.1 $130.05 $13.00
$0.00
$0.00
TOTAL= $143.05
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 CONCRETO F´C=150 KG/CM2 M3 0.033 $1,005.53 $33.18
2 ARMEX DE 15*15-4 PZA 1 $101.00 $101.00
3 CIMBRA COMÚN M2 0.4 $74.14 $29.66
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $163.84
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
¨ELABORACION DEL CONCRETO $0.00
1 4 PEONES CON REND DE 10M3/J C/U J 0.0132 $206.69 $2.73
¨CIMBRADO, ARAMDO Y COLADO $0.00
2 1 OFICIAL DE ALBAÑILERIA J 0.125 $378.94 $47.37
3 1 PEON J 0.125 $206.69 $25.84
$0.00
4 MAESTRO DE OBRA % 0.1 $75.93 $7.59
$0.00
$0.00
$0.00
TOTAL= $83.53
UNIDAD: 0
0
RENDIMIENTO: 7
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 CONCRETO F´C=200KG/CM2 CON 10% DESPERDICIO M3 0.0495 $1,078.32 $53.38
2 ARMEX DE 15X30-4 PZA 1 $117.20 $117.20
3 CIMBRA COMÚN M2 0.75 $91.51 $68.63
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $239.21
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
¨ELABORACION DEL CONCRETO DE 200 KG/CM2 $0.00
1 4 PEONES CON RENDIMIENTO DE 9 M3/J C/U J 0.022 $206.69 $4.55
¨ARMADO, CIMBRADO Y COLADO $0.00
2 1 0FICIAL DE ALBAÑILERIA J 0.14285714 $378.94 $54.13
3 2 PEONES J 0.28571429 $206.69 $59.05
$0.00
4 MAESTRO DE OBRA % 0.1 $117.74 $11.77
$0.00
$0.00
$0.00
TOTAL= $129.51
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 BLOCK HUECO C/5% DESPERDICIO PZA 33 $7.00 $231.00
2 MORTERO CEMENTO-CALHIDRA-ARENA 1:3:12 DESP 10% M3 0.0161 $821.38 $13.22
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $244.22
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 1 OFICIAL DE ALBAÑILERIA J 0.1428571 $478.97 $68.42
2 1 PEON J 0.1428571 $206.69 $29.53
$0.00
3 MAESTRO DE OBRA % 0.1 $97.95 $9.80
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $107.75
UNIDAD: P.T
CIMBRA EN LOSA DE AZOTEA, CON MADERA DE 1RA Y ACABADO COMÚN EN
LOSAS, INCLUYE MATERIALES, MANO DE OBRA, HERRAMIENTA Y/O EQUIPO.
RENDIMIENTO: 7
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 CIMBRA COMÚN PARA LOZAS P.T 1 $80.67 $80.67
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $80.67
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
1 I CARPINTERO DE OBRA NEGRA J 0.1428571 $478.97 $68.42
2 2 PEONES J 0.2857143 $206.69 $59.05
$0.00
3 MAESTRO DE OBRA % 0.1 $127.48 $12.75
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $140.23
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 MALLA ELECTROSOLDADA DE 6*6 - 4/4 M2 1 $12.69 $12.69
2 ACERO #3 KG 1 $12.18 $12.18
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $24.87
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 1 OFICIAL FIERRERO J 0.011765 $378.9400 $4.46
2 1 PEON J 0.011765 $206.69 $2.43
3 MAESTRO DE OBRA % 0.1 $6.89 $0.69
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $7.58
CONCRETO EN LOSA DE AZOTEA F'C= 200 KG/CM2 HECHO EN OBRA CON UNIDAD: M3
MAQUINA REVOLVEDORA TAMAÑO MÁXIMO DE AGREGADO DE 3/4" INCLUYE
MATERIALES, MANO DE OBRA EN ELABORACION,
COLOCADO,CIMBRADO,DESCIMBRADO, VIBRADO, HERRAMIENTA Y/O EQUIPO RENDIMIENTO: 1.5
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 CONCRETO F´C=200 KG/CM2 CON 10% DESPERDICIO M3 0.11 $1,078.32 $118.62
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $118.62
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
¨ELABORACION DEL CONCRETO $0.00
1 10 PEONES CON RENDIMIENTO DE 10M3/J J 0.11 $290.80 $31.99
$0.00
¨COLADO DE LA LOZA $0.00
2 I OFICIAL DE ALBAÑILERIA REND 6M3/J J 0.1666667 $478.97 $79.83
3 6 PEONES J 4 $290.80 $1,163.21
$0.00
4 MAESTRO DE OBRA % 0.1 $1,275.02 $127.50
$0.00
$0.00
TOTAL= $1,402.53
UNIDAD: SALIDA
CONCEPTO: INSTALACION HIDROSANITARIA, INCLUYE MATERIAL, MANO DE
OBRA Y HERRAMIENTA MENOR
RENDIMIENTO:
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 INSTALACION HIDRAULICA SALIDA 1 $467.40 $467.40
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $467.40
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 1 OFICIAL PLOMERO J 0.5 $378.94 $189.47
2 SAL/J $0.00
$0.00
2 1 MAESTRO DE OBRA 10% % 0.1 $189.47 $18.95
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $208.42
UNIDAD: SALIDA
CONCEPTO: INSTALACION ELECTRICA, INCLUYE MANO DE OBRA, MATERIALES,
Y HERRRAMIENTA MENOR
RENDIMIENTO:
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 INSTALACION ELECTRICA SALIDA 1 $67.40 $67.40
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $67.40
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 ELECTRICISTA J 0.5 $378.94 $189.47
2 SAL/J $0.00
$0.00
2 1 MAESTRO DE OBRA % 0.1 $189.47 $18.95
$0.00
$0.00
$0.00
$0.00
UNIDAD: M2
CONCEPTO: PINTURA VINILICA DE UN SOLO COLOR, A 2 MANOS, INCLUYE MANO
DE OBRA Y HERRAMIENTA MENOR
RENDIMIENTO:
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 PINTURA LT 0.125 $35.00 $4.38
8M2/LT $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $4.38
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 PINTOR J 0.028 $378.94 $10.61
35 M2/J $0.00
$0.00
2 1 MAESTRO DE OBRA % 0.1 $10.61 $1.06
$0.00
$0.00
MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 PINTURA LT 0.02 $35.00 $0.70
8M2/LT $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $0.70
MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 ALBAÑIL J 0.028 $378.94 $10.61
$0.00
$0.00
2 1 MAESTRO DE OBRA % 0.1 $10.61 $1.06
131.88
CIMENTACION
7.6448
suma 9.556
Plg A 1
2 A-D P.T Plg B 8 61.25239
Plg A 1
3 A-B´ P.T Plg B 8 24.50096
m C 11.2
Plg A 1
4 A-B´ P.T Plg B 8 24.50096
m C 11.2
Plg A 1
4´ A-B P.T Plg B 8 7.875308
m C 3.6
5 B´-D Plg A 1
P.T Plg B 8 33.77632
m C 15.44
piso
long ancho alto
1--2 A-B´ M2 3.25 3.39 11.02
FIRME PARA PISO DE 15 CM DE ESPESOR
PROMEDIO CON CONCRETO F'C= 150
KG/CM2 CON AGREGADO MÁXIMO 3/4" 1´--2 B´-C M2 2.25 0.78 1.76
HECHO EN OBRA CON MAQUINA 2´--2 B´-C 0.99 0.78
REVOLVEDORA INCLUYE ACARREOS,
MATERIALES, MANO DE OBRA EN 1´--2 C--D M2 2.49 2.53 6.30
ELABORACION, COLOCADO,
HERRAMIENTA Y/O EQUIPO.
2--5 B´-D M2 3.31 6.35 21.02
SUPERESTRUCTURA
TABLA
Plg A 1.00 1.00 812.38
CIMBRA EN LOSA DE AZOTEA, CON Plg B 275.59
MADERA DE 1RA Y ACABADO COMÚN EN
m C 10.78
LOSAS, INCLUYE MATERIALES, MANO DE
OBRA, HERRAMIENTA Y/O EQUIPO. 812.38
REGLA
Plg A 2.00 11.00 15.31
Plg B 4.00
m C 7.00
168.44
PIES DERECHO
Plg A 4.00 88.00 11.81
Plg B 4.00
m C 2.70
1039.54
DESPERDICIO 231.30
INSTALACION ELECTRICA
SUMINISTRO Y COLOCACION DE CENTRO
DE CARGA QOD-2, MARCA SQUARE'D; pza 1 1
INCLUYE: ACARREO,CONEXION, PRUEBA, 1
MATERIALES PARA SU FIJACION,
HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
INSTALACION HIDRAULICA
PZA 1.00
1.00
SUMINISTRO Y COLOCACION DE TINACO
PVC DE 750 LTS. MARCA ROTOPLAS O
SIMILAR, INCLUYE: ACARREO, ELEVACIÓN,
CONEXIÓN A LA ALIMENTACIÓN,
DESCARGA, HERRAMIENTA MENOR, MANO
DE OBRA Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION.
PZA 1.00
SUMINISTRO Y COLOCACIÓN DE
ACCESORIOS BLANCO LAMOSA O 1.00
SIMILAR, JABONERA CON AGARRADERA
DE PORCELANA LAMOSA O SIMILAR,
GANCHOS DE PORCELANA LAMOSA O
SIMILAR, TOALLERO DE PORCELANA;
INCLUYE: ACARREO, APERTURA DEL
HUECO EN MURO, COLOCACIÓN,
AMACIZADO CON MORTERO DE
AJPOP MERIDA SELVIN NAZARIO_____________
CEMENTO-ARENA 1:4, LIMPIEZA,
GARCIA HERRAMIENTA
OROZCO MIGUEL ANGEL_____________
MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
SIMILAR, JABONERA CON AGARRADERA
DE PORCELANA LAMOSA O SIMILAR,
GANCHOS DE PORCELANA LAMOSA O
COSTOSSIMILAR,
Y PRESUPUESTOS
FECHA: 11
TOALLERO DE PORCELANA;
DE DICIEMBRE
INCLUYE: 2015 DEL
ACARREO, APERTURA
NUMEROS GENERADORES
HUECO EN MURO, COLOCACIÓN,
AMACIZADO CON MORTERO DE
CEMENTO-ARENA 1:4, LIMPIEZA,
HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
PZA 1.00
1.00
SUMINISTRO Y COLOCACIÓN DE LAVABO
MARCA GEMINIS O SIMILAR BLANCO CON
LLAVE INDIV P/LAVABO RUGO 16Q,
CONTRA REJILLA Y CESPOL CROMADO,
AJPOP MERIDA
LIMPIEZASELVIN NAZARIO_____________
CON AGUA Y JABON, CONEXIÓN
GARCIA OROZCO MIGUEL ANGEL_____________
A LA ALIMENTACIÓN Y AL DESAGUE;
INCLUYE: ACARREO, MATERIALES PARA
SU FIJACION, CONEXION, HERRAMIENTA,
COSTOS Y PRESUPUESTOS
FECHA:SUMINISTRO Y COLOCACIÓN
11 DE DICIEMBRE 2015DE LAVABO NUMEROS GENERADORES
MARCA GEMINIS O SIMILAR BLANCO CON
LLAVE INDIV P/LAVABO RUGO 16Q,
CONTRA REJILLA Y CESPOL CROMADO,
LIMPIEZA CON AGUA Y JABON, CONEXIÓN
A LA ALIMENTACIÓN Y AL DESAGUE;
INCLUYE: ACARREO, MATERIALES PARA
SU FIJACION, CONEXION, HERRAMIENTA,
MANO DE OBRA Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION.
PZA 1.00
SUMINISTRO Y COLOCACIÓN DE 1.00
FREGADERO METÁLICO DE 90 X 45 CM.
CON ESCURRIDERO, TIPO LADO
DERECHO, CON LLAVE DE NARIZ, CESPOL
CROMADO, SOPORTADO POR DOS
MUROS CAPUCHINOS, FORRADO DE
AZULEJO BLANCO DE 15 X 15 CM. EN
AMBAS CARAS; INCLUYE: ACARREOS,
MATERIALES PARA SU FIJACIÓN,
PRUEBAS, HERRAMIENTA MENOR, MANO
DE OBRA Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION.
AJPOP MERIDA SELVIN NAZARIO_____________
GARCIA OROZCO MIGUEL ANGEL_____________
MUROS CAPUCHINOS, FORRADO DE
AZULEJO BLANCO DE 15 X 15 CM. EN
AMBAS CARAS; INCLUYE: ACARREOS,
COSTOS YMATERIALES
PRESUPUESTOS
PARA SU FIJACIÓN,
FECHA:PRUEBAS, HERRAMIENTA2015
11 DE DICIEMBRE MENOR, MANO NUMEROS GENERADORES
DE OBRA Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION.
SAL 1.00
SALIDA MUEBLE SANITARIO CON TUBO 1.00
HIDRÁULICO COBRE TIPO "M" 13mm.;
INCLUYE: VALVULA DE PASO Y VÁLVULA
DE CONTROL GENERAL, RAMALEO CON
TUBO DE COBRE DE 13 A 100 MM DE
DIÁMETRO, CONEXIONES, ALIMENTACIÓN
Y DESCARGA DE TINACO, ACARREO,
PRUEBA HIDROSTÁTICA, SOLDADURA,
HERRAMIENTA, MANO DE OBRA Y TODO
LO NECESARIO PARA SU CORRECTA
EJECUCION.
SAL 1.00
1.00
SALIDA DE REGADERA CON TUBO
HIDRÁULICO DE COBRE TIPO " M" Y
ACCESORIOS EN 13mm;
INCLUYE:CONEXIONES, RAMALEO,
CONEXIONES A BAJADA DE AGUAS
NEGRAS, HERRAMIENTA MENOR, MANO
DE OBRA Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION.
AJPOP MERIDA SELVIN NAZARIO_____________
GARCIA OROZCO MIGUEL ANGEL_____________
SALIDA DE REGADERA CON TUBO
HIDRÁULICO DE COBRE TIPO " M" Y
ACCESORIOS EN 13mm;
COSTOS YINCLUYE:CONEXIONES,
PRESUPUESTOSRAMALEO,
CONEXIONES A BAJADA DE AGUAS
FECHA: NEGRAS,
11 DE DICIEMBRE NUMEROS GENERADORES
HERRAMIENTA 2015
MENOR, MANO
DE OBRA Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION.
SAL 1.00
1.00
SALIDA DE REGADERA CON TUBO
HIDRÁULICO DE COBRE TIPO " M" Y
ACCESORIOS EN 13mm;
INCLUYE:CONEXIONES, RAMALEO,
CONEXIONES A BAJADA DE AGUAS
NEGRAS, HERRAMIENTA MENOR, MANO
DE OBRA Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION.
SAL 1.00
1.00
SALIDA DE LLAVE DE NARIZ EN EXTERIOR
CON TUBO HIDRÁULICO DE COBRE TIPO "
M" Y ACCESORIOS EN 13mm;
INCLUYE:CONEXIONES, RAMALEO,
HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
PZA 1.00
SUMINISTRO Y COLOCACIÓN DE
CISTERNA DE PLÁSTICO ROTOPLAS O 1.00
SIMILAR EQUIPADA DE 2800 LT,
FABRICADA CON PLÁSTICO AB-ANTI-
BACTERIAS, INCLUYE: TUBERÍA DE
ALIMENTACIÓN INTERNA, FILTRO,
VÁLVULA DE PIE O PICHANCHA, VÁLVULA
DE LLENADO DE 3/4", VÁLVULA DE
ESFERA 3/4" CON REDUCCIÓN A A 1/2",
MANO
AJPOP MERIDA DE OBRA
SELVIN DE COLOCACIÓN,
NAZARIO_____________
HERRAMIENTA
GARCIA OROZCO MIGUELMENOR Y TODO LO
ANGEL_____________
NECESARIO PARA SU CORRECTA
EJECUCION.
SIMILAR EQUIPADA DE 2800 LT,
FABRICADA CON PLÁSTICO AB-ANTI-
BACTERIAS, INCLUYE: TUBERÍA DE
COSTOS YALIMENTACIÓN
PRESUPUESTOSINTERNA, FILTRO,
VÁLVULA DE PIE O PICHANCHA, VÁLVULA
FECHA: 11DE
DE DICIEMBRE 2015 DE NUMEROS GENERADORES
LLENADO DE 3/4", VÁLVULA
ESFERA 3/4" CON REDUCCIÓN A A 1/2",
MANO DE OBRA DE COLOCACIÓN,
HERRAMIENTA MENOR Y TODO LO
NECESARIO PARA SU CORRECTA
EJECUCION.
INSTALACION SANITARIA
PZA 4.00
4.00
REGISTRO DE 0.6m x 0.6m. DE MEDIDAS
INTERIORES Y 1.00M. DE PROFUNDIDAD, A
AJPOP MERIDA
BASESELVIN
DE MUROSNAZARIO_____________
DE TABIQUE ROJO
GARCIA OROZCO MIGUEL
RECOCIDO DE 13 ANGEL_____________
CMS. DE ESPESOR,
ASENTADO CON MORTERO DE CEMENTO
ARENA EN PROPORCIÓN DE 1:5, DE 1 CM.
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES
REGISTRO DE 0.6m x 0.6m. DE MEDIDAS
INTERIORES Y 1.00M. DE PROFUNDIDAD, A
BASE DE MUROS DE TABIQUE ROJO
RECOCIDO DE 13 CMS. DE ESPESOR,
ASENTADO CON MORTERO DE CEMENTO
ARENA EN PROPORCIÓN DE 1:5, DE 1 CM.
DE ESPESOR. APLANADO ACABADO
PULIDO EN INTERIOR CON MORTERO
CEMENTO ARENA 1:5. FIRME DE 0.05 CMS.
DE ESPESOR DE CONCRETO HECHO EN
OBRA DE F'C= 150 KG/CM2. INCLUYE:
ACARREO, MATERIALES, MANO DE OBRA,
HERRAMIENTA, LIMPIEZA Y TODO LO
NECESARIO PARA SU CORRECTA
EJECUCION.
PZA 4.00
4.00
SAL 1.00
SUMISTRO Y COLOCACION DE SALIDA 1.00
LABAVO CON TUBO DE PVC LISO
SANITARIO DE 2" Y DEMAS ACCESORIOS,
INLCUYE: ACARREOS, CONEXIONES,
RAMALEO CON TUBO DE PVC,
CONEXIONES A BAJADA DE AGUAS
NEGRAS, TENDIDO, JUNTEO, PEGAMENTO
DE PVC, ALINEACIÓN, PRUEBAS,
HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
PZA 1.00
1.00
SUMINISTRO Y COLOCACIÓN DE
COLADERA HELVEX No. 2514 (PISO),
INCLUYE: ACARREO, INSTALACIÓN, SELLO
CON MORTERO CEMENTO-ARENA,
PROPORCIÓN 1:4, PRUEBAS, PEGAMENTO
DE PVC, CONEXIONES, HERRAMIENTA
MENOR, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA
EJECUCION.
HERRERIA Y VENTANERIA
PZA 4.00
4.00
SUMINISTRO E INSTALACION DE PUERTA
TIPO MULTIPANEL LISA, DIFERENTES
MEDIDAS CON CERRADURA
AJPOP MERIDA SELVIN MARCAFANAL
NAZARIO_____________
525 O SIMILAR. INCLUYE. ACARREO,
GARCIA OROZCO MIGUEL ANGEL_____________
INSTALACION, LIMPIEZA, PREPARACION
DE LA SUPERFICIE, MATERIALES PARA SU
COSTOS Y PRESUPUESTOS
FECHA:SUMINISTRO
11 DE DICIEMBRE 2015 NUMEROS GENERADORES
E INSTALACION DE PUERTA
TIPO MULTIPANEL LISA, DIFERENTES
MEDIDAS CON CERRADURA MARCAFANAL
525 O SIMILAR. INCLUYE. ACARREO,
INSTALACION, LIMPIEZA, PREPARACION
DE LA SUPERFICIE, MATERIALES PARA SU
FIJACION, HERRAMIENTA, MANO DE OBRA
Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
PZA 4.00
SUMINISTRO Y COLOCACION DE 4.00
VENTANAS DE ALUMINIO ANODIZADO
NATURAL, DOS SECCIONES, FIJO Y
CORREDIZO CON CRISTAL CLARO DE 3
MM. DE ESPESOR. INCLUYE. ACARREO,
INSTALACION, LIMPIEZA, PREPARACION
DE LA SUPERFICIE, MATERIALES PARA SU
FIJACION, HERRAMIENTA, MANO DE OBRA
Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
ACABADOS
55.76
OBSERVACIONES
sentido largo
sentido corto
TOTAL 6369.81
EXCAVACION
TOTAL 5225.23
CIMENTACION
PLANTILLA DE CONCRETO
M2 38.22 5.76 220.05
CONCRETO EN ZAPATA DE
M3 9.56 1831.08 17497.82
ACERO EN CIMENTACIONKG
D 534.86 31.28 16729.47
TOTAL 190256.44
SUPER ESTRUCTURA
CONCRETO EN LOSA DE A
M3 7.35 2076.16337 15254.901
TOTAL 900399.41
INSTALACAION ELECTRICA
SUMISTRO Y COLOCACION
SAL 1 440.86 440.86
SALIDA DE CONTACTO MO
SAL 1 450.7 450.7
TOTAL 9293.55
INSTALACION HIDRAULICA
SALIDA DE REGADERA CO
SAL 1.00 1010.2 1010.2
SUMINISTRO Y COLOCACIÓ
PZA 1.00 1456.4 1456.4
INSTALACION SANITARIA
SUMINISTRO Y COLOCACIO
PZA 4.00 610.39 2441.56
SUMISTRO Y COLOCACION
SAL 1.00 320.48 320.48
TOTAL 12142.365
HERRERIA Y VENTANERIA
TOTAL 7782.76
ACABADOS
TOTAL 102044.604
CONCEPTO IMPORTE
LIMPIEZA, TRAZO Y NIVELACION $6,369.806
EXCAVACION $5,225.229
CIMENTACION $190,256.437
SUPER ESTRUCTURA $900,399.405
INSTALACAION ELECTRICA $9,293.550
INSTALACION HIDRAULICA $15,450.320
INSTALACION SANITARIA $12,142.365
HERRERIA Y VENTANERIA $7,782.760
ACABADOS $102,044.604