PROYECTO: CONSTRUCCION DE PAVIMENTO RIGIDO PARA LAS CALLES DE SAN MIGUEL DE VELASCO
TOTAL 3,253.10
TOTAL 3,253.10
LONGITUD VOLUMEN
AREA m2
m m3
132.75 0.0225 2.99
71.62 0.0225 1.61
177.72 0.0225 4
139.52 0.0225 3.14
57.64 0.0225 1.3
319.44 0.0225 7.19
153.22 0.0225 3.45
131.07 0.0225 2.95
276.17 0.0225 6.21
252.51 0.0225 5.68
8.16 0.0225 0.18
74.99 0.0225 1.69
57.65 0.0225 1.3
8.27 0.0225 0.19
132.01 0.0225 2.97
60.34 0.0225 1.36
68.73 0.0225 1.55
7.78 0.0225 0.18
131.41 0.0225 2.96
9.01 0.0225 0.2
499.4 0.0225 11.24
TOTAL 62.34
COMPUTO METRICO
PROYECTO: CONSTRUCCION DE PAVIMENTO RIGIDO PARA LAS CALLES DE SAN MIGUEL DE VELASCO
ITEM: 6
Descripcion: Corte con Maquina
Unidad: M3
PROGRESIVA VOLUMEN VOLUMEN
DISTANCIAS AREA MEDIA
AREA (MT2.) PARCIAL ACUMULADO
INICIAL (MTS). (MT2.)
(MT3). (MT3).
CALLE 29 DE SEPTIEMBRE
CALLE: 161.99 m3
DOBLE VIA A SURTIDOR
0+000.00 0.00 0.34
0+010.00 10.00 0.56 0.45 4.50 4.50
0+020.00 10.00 0.48 0.52 5.20 9.70
0+030.00 10.00 0.32 0.40 4.00 13.70
0+040.00 10.00 0.39 0.36 3.55 17.25
0+050.00 10.00 0.51 0.45 4.50 21.75
0+060.00 10.00 0.66 0.59 5.85 27.60
0+070.00 10.00 0.60 0.63 6.30 33.90
0+080.00 10.00 0.36 0.48 4.80 38.70
0+090.00 10.00 0.38 0.37 3.70 42.40
0+100.00 10.00 0.37 0.38 3.75 46.15
0+110.00 10.00 0.45 0.41 4.10 50.25
INTERSECCION 92.04 142.29
0+150.00 10.00 0.46 142.29
0+160.00 10.00 0.44 0.45 4.50 146.79
0+170.00 10.00 0.45 0.45 4.45 151.24
0+180.00 10.00 0.37 0.41 4.10 155.34
0+190.00 10.00 0.31 0.34 3.40 158.74
0+200.00 10.00 0.34 0.33 3.25 161.99
SUBTOTAL 161.99
PROGRESIVA VOLUMEN VOLUMEN
DISTANCIAS AREA MEDIA
AREA (MT2.) PARCIAL ACUMULADO
INICIAL (MTS). (MT2.)
(MT3). (MT3).
CALLE CIRO LORENZO
CALLE: DORADO DE SURTIDOR A 120.50 m3
HOSPITAL
0+020.00 0.00 1.05
0+030.00 10.00 0.88 0.97 9.65 9.65
0+040.00 10.00 0.55 0.72 7.15 16.80
0+050.00 10.00 0.36 0.46 4.55 21.35
0+060.00 10.00 0.37 0.37 3.65 25.00
INTERSECCION 80.67 105.67
0+100.00 10.00 0.66 105.67
0+110.00 10.00 0.52 0.59 5.90 111.57
0+120.00 10.00 0.35 0.44 4.35 115.92
0+130.00 10.00 0.25 0.30 3.00 118.92
0+135.27 5.27 0.35 0.30 1.58 120.50
SUBTOTAL 120.50
PROGRESIVA VOLUMEN VOLUMEN
DISTANCIAS AREA MEDIA
AREA (MT2.) PARCIAL ACUMULADO
INICIAL (MTS). (MT2.)
(MT3). (MT3).
CALLE VELASCO DE
CALLE: 95.35 m3
HOSPITAL A PLAZA
0+000.00 0.00 0.28
0+010.00 10.00 0.54 0.41 4.10 4.10
0+020.00 10.00 0.57 0.56 5.55 9.65
0+030.00 10.00 0.63 0.60 6.00 15.65
0+040.00 10.00 0.71 0.67 6.70 22.35
0+050.00 10.00 0.75 0.73 7.30 29.65
0+060.00 10.00 0.82 0.79 7.85 37.50
0+070.00 10.00 0.85 0.84 8.35 45.85
0+080.00 10.00 0.89 0.87 8.70 54.55
0+090.00 10.00 0.98 0.94 9.35 63.90
0+100.00 10.00 1.03 1.01 10.05 73.95
0+110.00 10.00 1.07 1.05 10.50 84.45
0+120.00 10.00 1.11 1.09 10.90 95.35
SUBTOTAL 95.35
PROGRESIVA VOLUMEN VOLUMEN
DISTANCIAS AREA MEDIA
AREA (MT2.) PARCIAL ACUMULADO
INICIAL (MTS). (MT2.)
(MT3). (MT3).
AREA 1 613.57 M2
ESPESOR DE 0.15 M
CORTE
VOLUMEN 92.04 M3
CALCULO DE BASE
AREA 1 613.57 M2
ESPESOR DE 0.15 M
CAPA
VOLUMEN 92.04 M3
CALCULO DE PAVIMENTO
AREA 1 613.57 M2
ESPESOR DE 0.2 M
CAPA
VOLUMEN 122.71 M3
INTERSECCION C. CIRO LORENZO Y C. VELASCO
AREA 1 537.81 M2
ESPESOR DE 0.15 M
CORTE
VOLUMEN 80.67 M3
CALCULO DE BASE
AREA 1 537.81 M2
ESPESOR DE 0.15 M
CAPA
VOLUMEN 80.67 M3
CALCULO DE PAVIMENTO
AREA 1 537.81 M2
ESPESOR DE 0.2 M
CAPA
VOLUMEN 107.56 M3
INTERSECCION C.MANUEL DORADO Y HUANCHACA
AREA 1 576.47 M2
ESPESOR DE 0.15 M
CORTE
VOLUMEN 86.47 M3
CALCULO DE BASE
AREA 1 576.47 M2
ESPESOR DE 0.15 M
CAPA
VOLUMEN 86.47 M3
CALCULO DE PAVIMENTO
AREA 1 576.47 M2
ESPESOR DE 0.2 M
CAPA
VOLUMEN 115.29 M3
INTERSECCION C. 29 SEPT Y CHIQUITOS
AREA 1 396.08 M2
ESPESOR DE 0.15 M
CORTE
VOLUMEN 59.41 M3
CALCULO DE BASE
AREA 1 396.08 M2
ESPESOR DE 0.15 M
CAPA
VOLUMEN 59.41 M3
CALCULO DE PAVIMENTO
AREA 1 396.08 M2
ESPESOR DE 0.2 M
CAPA
VOLUMEN 79.22 M3
INTERSECCION C. CHIQUITOS Y SUCRE
AREA 1 492.37 M2
ESPESOR DE 0.15 M
CORTE
VOLUMEN 73.86 M3
CALCULO DE BASE
AREA 1 492.37 M2
ESPESOR DE 0.15 M
CAPA
VOLUMEN 73.86 M3
CALCULO DE PAVIMENTO
AREA 1 492.37 M2
ESPESOR DE 0.2 M
CAPA
VOLUMEN 98.47 M3
INTERSECCION C. SUCRE Y C BOLIVAR
AREA 1 385.78 M2
ESPESOR DE 0.15 M
CORTE
VOLUMEN 57.87 M3
CALCULO DE BASE
AREA 1 385.78 M2
ESPESOR DE 0.15 M
CAPA
VOLUMEN 57.87 M3
CALCULO DE PAVIMENTO
AREA 1 385.78 M2
ESPESOR DE 0.2 M
CAPA
VOLUMEN 77.16 M3
INTERSECCION C. BOLIVAR Y 29 DE SEP
AREA 1 594.29 M2
ESPESOR DE 0.15 M
CORTE
VOLUMEN 89.14 M3
CALCULO DE BASE
AREA 1 594.29 M2
ESPESOR DE 0.15 M
CAPA
VOLUMEN 89.14 M3
CALCULO DE PAVIMENTO
AREA 1 594.29 M2
ESPESOR DE 0.2 M
CAPA
VOLUMEN 118.86 M3
INTERSECCION PZA Y BETANIA
AREA 1 372.3 M2
ESPESOR DE 0.15 M
CORTE
VOLUMEN 55.85 M3
CALCULO DE BASE
AREA 1 372.3 M2
ESPESOR DE 0.15 M
CAPA
VOLUMEN 55.85 M3
CALCULO DE PAVIMENTO
AREA 1 372.3 M2
ESPESOR DE 0.2 M
CAPA
VOLUMEN 74.46 M3
INTERSECCION PZA Y VELASCO
AREA 1 361.43 M2
ESPESOR DE 0.15 M
CORTE
VOLUMEN 54.21 M3
CALCULO DE BASE
AREA 1 361.43 M2
ESPESOR DE 0.15 M
CAPA
VOLUMEN 54.21 M3
CALCULO DE PAVIMENTO
AREA 1 361.43 M2
ESPESOR DE 0.2 M
CAPA
VOLUMEN 72.29 M3
PLANILLA COMPUTOS METRICOS
#REF!
MODULO: CANCHA POLIFUNCIONAL