Está en la página 1de 351

LLANSA INGENIEROS S.

A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+000.00 14.450 -3.00% -3.00% 14.423 14.612 14.612 14.423


0+001.40 14.446 -3.00% -3.00% 14.419 14.608 14.608 14.419
0+002.80 14.441 -3.00% -3.00% 14.414 14.603 14.603 14.414
0+004.20 14.437 -3.00% -3.00% 14.410 14.599 14.599 14.410
0+005.60 14.432 -3.00% -3.00% 14.405 14.594 14.594 14.405
0+007.00 14.428 -3.00% -3.00% 14.401 14.590 14.590 14.401
0+008.40 14.423 -3.00% -3.00% 14.396 14.585 14.585 14.396
0+009.80 14.419 -3.00% -3.00% 14.392 14.581 14.581 14.392
0+011.20 14.414 -3.00% -3.00% 14.387 14.576 14.576 14.387
0+012.60 14.410 -3.00% -3.00% 14.383 14.572 14.572 14.383
0+014.00 14.405 -3.00% -3.00% 14.378 14.567 14.567 14.378
0+015.40 14.401 -3.00% -3.00% 14.374 14.563 14.563 14.374
0+016.80 14.396 -3.00% -3.00% 14.369 14.558 14.558 14.369
0+018.20 14.392 -3.00% -3.00% 14.365 14.554 14.554 14.365
0+019.60 14.388 -3.00% -3.00% 14.361 14.550 14.550 14.361
0+021.00 14.383 -3.00% -3.00% 14.356 14.545 14.545 14.356
0+022.40 14.379 -3.00% -3.00% 14.352 14.541 14.541 14.352
0+023.80 14.374 -3.00% -3.00% 14.347 14.536 14.536 14.347
0+025.20 14.370 -3.00% -3.00% 14.343 14.532 14.532 14.343
0+026.60 14.365 -3.00% -3.00% 14.338 14.527 14.527 14.338
0+028.00 14.361 -3.00% -3.00% 14.334 14.523 14.523 14.334
0+029.40 14.356 -3.00% -3.00% 14.329 14.518 14.518 14.329
0+030.80 14.352 -3.00% -3.00% 14.325 14.514 14.514 14.325
0+032.20 14.347 -3.00% -3.00% 14.320 14.509 14.509 14.320
0+033.60 14.343 -3.00% -3.00% 14.316 14.505 14.505 14.316
0+035.00 14.338 -3.00% -3.00% 14.311 14.500 14.500 14.311
0+036.40 14.334 -3.00% -3.00% 14.307 14.496 14.496 14.307
0+037.80 14.330 -3.00% -3.00% 14.303 14.492 14.492 14.303
0+039.20 14.325 -3.00% -3.00% 14.298 14.487 14.487 14.298
0+040.60 14.321 -3.00% -3.00% 14.294 14.483 14.483 14.294

1 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+042.00 14.316 -3.00% -3.00% 14.289 14.478 14.478 14.289


0+043.40 14.312 -3.00% -3.00% 14.285 14.474 14.474 14.285
0+044.80 14.307 -3.00% -3.00% 14.280 14.469 14.469 14.280
0+046.20 14.303 -3.00% -3.00% 14.276 14.465 14.465 14.276
0+047.60 14.298 -3.00% -3.00% 14.271 14.460 14.460 14.271
0+049.00 14.294 -3.00% -3.00% 14.267 14.456 14.456 14.267
0+050.40 14.289 -3.00% -3.00% 14.262 14.451 14.451 14.262
0+051.80 14.285 -3.00% -3.00% 14.258 14.447 14.447 14.258
0+053.20 14.280 -3.00% -3.00% 14.253 14.442 14.442 14.253
0+054.60 14.276 -3.00% -3.00% 14.249 14.438 14.438 14.249
0+056.00 14.272 -3.00% -3.00% 14.245 14.434 14.434 14.245
0+057.40 14.267 -3.00% -3.00% 14.240 14.429 14.429 14.240
0+058.80 14.263 -3.00% -3.00% 14.236 14.425 14.425 14.236
0+060.20 14.258 -3.00% -3.00% 14.231 14.420 14.420 14.231
0+061.60 14.254 -3.00% -3.00% 14.227 14.416 14.416 14.227
0+063.00 14.249 -3.00% -3.00% 14.222 14.411 14.411 14.222
0+064.40 14.245 -3.00% -3.00% 14.218 14.407 14.407 14.218
0+065.80 14.240 -3.00% -3.00% 14.213 14.402 14.402 14.213
0+067.20 14.236 -3.00% -3.00% 14.209 14.398 14.398 14.209
0+068.60 14.231 -3.00% -3.00% 14.204 14.393 14.393 14.204
0+070.00 14.227 -3.00% -3.00% 14.200 14.389 14.389 14.200
0+071.40 14.222 -3.00% -3.00% 14.195 14.384 14.384 14.195
0+072.80 14.218 -3.00% -3.00% 14.191 14.380 14.380 14.191
0+074.20 14.214 -3.00% -3.00% 14.187 14.376 14.376 14.187
0+075.60 14.209 -3.00% -3.00% 14.182 14.371 14.371 14.182
0+077.00 14.205 -3.00% -3.00% 14.178 14.367 14.367 14.178
0+078.40 14.200 -3.00% -3.00% 14.173 14.362 14.362 14.173
0+079.80 14.196 -3.00% -3.00% 14.169 14.358 14.358 14.169
0+081.20 14.191 -3.00% -3.00% 14.164 14.353 14.353 14.164
0+082.60 14.187 -3.00% -3.00% 14.160 14.349 14.349 14.160

2 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+084.00 14.182 -3.00% -3.00% 14.155 14.344 14.344 14.155


0+085.40 14.178 -3.00% -3.00% 14.151 14.340 14.340 14.151
0+086.80 14.173 -3.00% -3.00% 14.146 14.335 14.335 14.146
0+088.20 14.169 -3.00% -3.00% 14.142 14.331 14.331 14.142
0+089.60 14.164 -3.00% -3.00% 14.137 14.326 14.326 14.137
0+091.00 14.160 -3.00% -3.00% 14.133 14.322 14.322 14.133
0+092.40 14.156 -3.00% -3.00% 14.129 14.318 14.318 14.129
0+093.80 14.151 -3.00% -3.00% 14.124 14.313 14.313 14.124
0+095.20 14.147 -3.00% -3.00% 14.120 14.309 14.309 14.120
0+096.60 14.142 -3.00% -3.00% 14.115 14.304 14.304 14.115
0+098.00 14.138 -3.00% -3.00% 14.111 14.300 14.300 14.111
0+099.40 14.133 -3.00% -3.00% 14.106 14.295 14.295 14.106
0+100.80 14.129 -3.00% -3.00% 14.102 14.291 14.291 14.102
0+102.20 14.124 -3.00% -3.00% 14.097 14.286 14.286 14.097
0+103.60 14.120 -3.00% -3.00% 14.093 14.282 14.282 14.093
0+105.00 14.115 -3.00% -3.00% 14.088 14.277 14.277 14.088
0+106.40 14.111 -3.00% -3.00% 14.084 14.273 14.273 14.084
0+107.80 14.107 -3.00% -3.00% 14.080 14.269 14.269 14.080
0+109.20 14.102 -3.00% -3.00% 14.075 14.264 14.264 14.075
0+110.60 14.098 -3.00% -3.00% 14.071 14.260 14.260 14.071
0+112.00 14.093 -3.00% -3.00% 14.066 14.255 14.255 14.066
0+113.40 14.089 -3.00% -3.00% 14.062 14.251 14.251 14.062
0+114.80 14.084 -3.00% -3.00% 14.057 14.246 14.246 14.057
0+116.20 14.080 -3.00% -3.00% 14.053 14.242 14.242 14.053
0+117.60 14.075 -3.00% -3.00% 14.048 14.237 14.237 14.048
0+119.00 14.071 -3.00% -3.00% 14.044 14.233 14.233 14.044
0+120.40 14.066 -3.00% -3.00% 14.039 14.228 14.228 14.039
0+121.80 14.062 -3.00% -3.00% 14.035 14.224 14.224 14.035
0+123.20 14.057 -3.00% -3.00% 14.030 14.219 14.219 14.030
0+124.60 14.053 -3.00% -3.00% 14.026 14.215 14.215 14.026

3 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+126.00 14.049 -3.00% -3.00% 14.022 14.211 14.211 14.022


0+127.40 14.044 -3.00% -3.00% 14.017 14.206 14.206 14.017
0+128.80 14.040 -3.00% -3.00% 14.013 14.202 14.202 14.013
0+130.20 14.035 -3.00% -3.00% 14.008 14.197 14.197 14.008
0+131.60 14.031 -3.00% -3.00% 14.004 14.193 14.193 14.004
0+133.00 14.026 -3.00% -3.00% 13.999 14.188 14.188 13.999
0+134.40 14.022 -3.00% -3.00% 13.995 14.184 14.184 13.995
0+135.80 14.017 -3.00% -3.00% 13.990 14.179 14.179 13.990
0+137.20 14.013 -3.00% -3.00% 13.986 14.175 14.175 13.986
0+138.60 14.008 -3.00% -3.00% 13.981 14.170 14.170 13.981
0+140.00 14.004 -3.00% -3.00% 13.977 14.166 14.166 13.977
0+141.40 13.999 -3.00% -3.00% 13.972 14.161 14.161 13.972
0+142.80 13.995 -3.00% -3.00% 13.968 14.157 14.157 13.968
0+144.20 13.991 -3.00% -3.00% 13.964 14.153 14.153 13.964
0+145.60 13.986 -3.00% -3.00% 13.959 14.148 14.148 13.959
0+147.00 13.982 -3.00% -3.00% 13.955 14.144 14.144 13.955
0+148.40 13.977 -3.00% -3.00% 13.950 14.139 14.139 13.950
0+149.80 13.973 -3.00% -3.00% 13.946 14.135 14.135 13.946
0+151.20 13.968 -3.00% -3.00% 13.941 14.130 14.130 13.941
0+152.60 13.964 -3.00% -3.00% 13.937 14.126 14.126 13.937
0+154.00 13.959 -3.00% -3.00% 13.932 14.121 14.121 13.932
0+155.40 13.955 -3.00% -3.00% 13.928 14.117 14.117 13.928
0+156.80 13.950 -3.00% -3.00% 13.923 14.112 14.112 13.923
0+158.20 13.946 -3.00% -3.00% 13.919 14.108 14.108 13.919
0+159.60 13.941 -3.00% -3.00% 13.914 14.103 14.103 13.914
0+161.00 13.937 -3.00% -3.00% 13.910 14.099 14.099 13.910
0+162.40 13.933 -3.00% -3.00% 13.906 14.095 14.095 13.906
0+163.80 13.928 -3.00% -3.00% 13.901 14.090 14.090 13.901
0+165.20 13.924 -3.00% -3.00% 13.897 14.086 14.086 13.897
0+166.60 13.919 -3.00% -3.00% 13.892 14.081 14.081 13.892

4 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+168.00 13.915 -3.00% -3.00% 13.888 14.077 14.077 13.888


0+169.40 13.910 -3.00% -3.00% 13.883 14.072 14.072 13.883
0+170.80 13.906 -3.00% -3.00% 13.879 14.068 14.068 13.879
0+172.20 13.901 -3.00% -3.00% 13.874 14.063 14.063 13.874
0+173.60 13.897 -3.00% -3.00% 13.870 14.059 14.059 13.870
0+175.00 13.892 -3.00% -3.00% 13.865 14.054 14.054 13.865
0+176.40 13.888 -3.00% -3.00% 13.861 14.050 14.050 13.861
0+177.80 13.883 -3.00% -3.00% 13.856 14.045 14.045 13.856
0+179.20 13.879 -3.00% -3.00% 13.852 14.041 14.041 13.852
0+180.60 13.875 -3.00% -3.00% 13.848 14.037 14.037 13.848
0+182.00 13.870 -3.00% -3.00% 13.843 14.032 14.032 13.843
0+183.40 13.866 -3.00% -3.00% 13.839 14.028 14.028 13.839
0+184.80 13.861 -3.00% -3.00% 13.834 14.023 14.023 13.834
0+186.20 13.857 -3.00% -3.00% 13.830 14.019 14.019 13.830
0+187.60 13.852 -3.00% -3.00% 13.825 14.014 14.014 13.825
0+189.00 13.848 -3.00% -3.00% 13.821 14.010 14.010 13.821
0+190.40 13.843 -3.00% -3.00% 13.816 14.005 14.005 13.816
0+191.80 13.839 -3.00% -3.00% 13.812 14.001 14.001 13.812
0+193.20 13.834 -3.00% -3.00% 13.807 13.996 13.996 13.807
0+194.60 13.830 -3.00% -3.00% 13.803 13.992 13.992 13.803
0+196.00 13.825 -3.00% -3.00% 13.798 13.987 13.987 13.798
0+197.40 13.821 -3.00% -3.00% 13.794 13.983 13.983 13.794
0+198.80 13.817 -3.00% -3.00% 13.790 13.979 13.979 13.790
0+200.20 13.812 -3.00% -3.00% 13.785 13.974 13.974 13.785
0+201.60 13.808 -3.00% -3.00% 13.781 13.970 13.970 13.781
0+203.00 13.803 -3.00% -3.00% 13.776 13.965 13.965 13.776
0+204.40 13.799 -3.00% -3.00% 13.772 13.961 13.961 13.772
0+205.80 13.794 -3.00% -3.00% 13.767 13.956 13.956 13.767
0+207.20 13.790 -3.00% -3.00% 13.763 13.952 13.952 13.763
0+208.60 13.785 -3.00% -3.00% 13.758 13.947 13.947 13.758

5 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+210.00 13.781 -3.00% -3.00% 13.754 13.943 13.943 13.754


0+211.40 13.776 -3.00% -3.00% 13.749 13.938 13.938 13.749
0+212.80 13.772 -3.00% -3.00% 13.745 13.934 13.934 13.745
0+214.20 13.767 -3.00% -3.00% 13.740 13.929 13.929 13.740
0+215.60 13.763 -3.00% -3.00% 13.736 13.925 13.925 13.736
0+217.00 13.759 -3.00% -3.00% 13.732 13.921 13.921 13.732
0+218.40 13.754 -3.00% -3.00% 13.727 13.916 13.916 13.727
0+219.80 13.750 -3.00% -3.00% 13.723 13.912 13.912 13.723
0+221.20 13.745 -3.00% -3.00% 13.718 13.907 13.907 13.718
0+222.60 13.741 -3.00% -3.00% 13.714 13.903 13.903 13.714
0+224.00 13.736 -3.00% -3.00% 13.709 13.898 13.898 13.709
0+225.40 13.732 -3.00% -3.00% 13.705 13.894 13.894 13.705
0+226.80 13.727 -3.00% -3.00% 13.700 13.889 13.889 13.700
0+228.20 13.723 -3.00% -3.00% 13.696 13.885 13.885 13.696
0+229.60 13.718 -3.00% -3.00% 13.691 13.880 13.880 13.691
0+231.00 13.714 -3.00% -3.00% 13.687 13.876 13.876 13.687
0+232.40 13.709 -3.00% -3.00% 13.682 13.871 13.871 13.682
0+233.80 13.705 -3.00% -3.00% 13.678 13.867 13.867 13.678
0+235.20 13.701 -3.00% -3.00% 13.674 13.863 13.863 13.674
0+236.60 13.696 -3.00% -3.00% 13.669 13.858 13.858 13.669
0+238.00 13.692 -3.00% -3.00% 13.665 13.854 13.854 13.665
0+239.40 13.687 -3.00% -3.00% 13.660 13.849 13.849 13.660
0+240.80 13.683 -3.00% -3.00% 13.656 13.845 13.845 13.656
0+242.20 13.678 -3.00% -3.00% 13.651 13.840 13.840 13.651
0+243.60 13.674 -3.00% -3.00% 13.647 13.836 13.836 13.647
0+245.00 13.669 -3.00% -3.00% 13.642 13.831 13.831 13.642
0+246.40 13.665 -3.00% -3.00% 13.638 13.827 13.827 13.638
0+247.80 13.660 -3.00% -3.00% 13.633 13.822 13.822 13.633
0+249.20 13.656 -3.00% -3.00% 13.629 13.818 13.818 13.629
0+250.60 13.651 -3.00% -3.00% 13.624 13.813 13.813 13.624

6 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+252.00 13.647 -3.00% -3.00% 13.620 13.809 13.809 13.620


0+253.40 13.643 -3.00% -3.00% 13.616 13.805 13.805 13.616
0+254.80 13.638 -3.00% -3.00% 13.611 13.800 13.800 13.611
0+256.20 13.634 -3.00% -3.00% 13.607 13.796 13.796 13.607
0+257.60 13.629 -3.00% -3.00% 13.602 13.791 13.791 13.602
0+259.00 13.625 -3.00% -3.00% 13.598 13.787 13.787 13.598
0+260.40 13.620 -3.00% -3.00% 13.593 13.782 13.782 13.593
0+261.80 13.616 -3.00% -3.00% 13.589 13.778 13.778 13.589
0+263.20 13.611 -3.00% -3.00% 13.584 13.773 13.773 13.584
0+264.60 13.607 -3.00% -3.00% 13.580 13.769 13.769 13.580
0+266.00 13.602 -3.00% -3.00% 13.575 13.764 13.764 13.575
0+267.40 13.598 -3.00% -3.00% 13.571 13.760 13.760 13.571
0+268.80 13.593 -3.00% -3.00% 13.566 13.755 13.755 13.566
0+270.20 13.589 -3.00% -3.00% 13.562 13.751 13.751 13.562
0+271.60 13.585 -3.00% -3.00% 13.558 13.747 13.747 13.558
0+273.00 13.580 -3.00% -3.00% 13.553 13.742 13.742 13.553
0+274.40 13.576 -3.00% -3.00% 13.549 13.738 13.738 13.549
0+275.80 13.571 -3.00% -3.00% 13.544 13.733 13.733 13.544
0+277.20 13.567 -3.00% -3.00% 13.540 13.729 13.729 13.540
0+278.60 13.562 -3.00% -3.00% 13.535 13.724 13.724 13.535
0+280.00 13.558 -3.00% -3.00% 13.531 13.720 13.720 13.531
0+281.40 13.553 -3.00% -3.00% 13.526 13.715 13.715 13.526
0+282.80 13.549 -3.00% -3.00% 13.522 13.711 13.711 13.522
0+284.20 13.544 -3.00% -3.00% 13.517 13.706 13.706 13.517
0+285.60 13.540 -3.00% -3.00% 13.513 13.702 13.702 13.513
0+287.00 13.536 -3.00% -3.00% 13.509 13.698 13.698 13.509
0+288.40 13.531 -3.00% -3.00% 13.504 13.693 13.693 13.504
0+289.80 13.527 -3.00% -3.00% 13.500 13.689 13.689 13.500
0+291.20 13.522 -3.00% -3.00% 13.495 13.684 13.684 13.495
0+292.60 13.518 -3.00% -3.00% 13.491 13.680 13.680 13.491

7 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+294.00 13.513 -3.00% -3.00% 13.486 13.675 13.675 13.486


0+295.40 13.509 -3.00% -3.00% 13.482 13.671 13.671 13.482
0+296.80 13.504 -3.00% -3.00% 13.477 13.666 13.666 13.477
0+298.20 13.500 -3.00% -3.00% 13.473 13.662 13.662 13.473
0+299.60 13.495 -3.00% -3.00% 13.468 13.657 13.657 13.468
0+301.00 13.491 -3.00% -3.00% 13.464 13.653 13.653 13.464
0+302.40 13.486 -3.00% -3.00% 13.459 13.648 13.648 13.459
0+303.80 13.482 -3.00% -3.00% 13.455 13.644 13.644 13.455
0+305.20 13.478 -3.00% -3.00% 13.451 13.640 13.640 13.451
0+306.60 13.473 -3.00% -3.00% 13.446 13.635 13.635 13.446
0+308.00 13.469 -3.00% -3.00% 13.442 13.631 13.631 13.442
0+309.40 13.465 -3.00% -3.00% 13.438 13.627 13.627 13.438
0+310.80 13.461 -3.00% -3.00% 13.434 13.623 13.623 13.434
0+312.20 13.458 -3.00% -3.00% 13.431 13.620 13.620 13.431
0+313.60 13.454 -3.00% -3.00% 13.427 13.616 13.616 13.427
0+315.00 13.450 -3.00% -3.00% 13.423 13.612 13.612 13.423
0+316.40 13.447 -3.00% -3.00% 13.420 13.609 13.609 13.420
0+317.80 13.444 -3.00% -3.00% 13.417 13.606 13.606 13.417
0+319.20 13.440 -3.00% -3.00% 13.413 13.602 13.602 13.413
0+320.60 13.437 -3.00% -3.00% 13.410 13.599 13.599 13.410
0+322.00 13.434 -3.00% -3.00% 13.407 13.596 13.596 13.407
0+323.40 13.431 -3.00% -3.00% 13.404 13.593 13.593 13.404
0+324.80 13.428 -3.00% -3.00% 13.401 13.590 13.590 13.401
0+326.20 13.426 -3.00% -3.00% 13.399 13.588 13.588 13.399
0+327.60 13.423 -3.00% -3.00% 13.396 13.585 13.585 13.396
0+329.00 13.421 -3.00% -3.00% 13.394 13.583 13.583 13.394
0+330.40 13.418 -3.00% -3.00% 13.391 13.580 13.580 13.391
0+331.80 13.416 -3.00% -3.00% 13.389 13.578 13.578 13.389
0+333.20 13.414 -3.00% -3.00% 13.387 13.576 13.576 13.387
0+334.60 13.412 -3.00% -3.00% 13.385 13.574 13.574 13.385

8 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+336.00 13.410 -3.00% -3.00% 13.383 13.572 13.572 13.383


0+337.40 13.408 -3.00% -3.00% 13.381 13.570 13.570 13.381
0+338.80 13.406 -3.00% -3.00% 13.379 13.568 13.568 13.379
0+340.20 13.404 -3.00% -3.00% 13.377 13.566 13.566 13.377
0+341.60 13.403 -3.00% -3.00% 13.376 13.565 13.565 13.376
0+343.00 13.401 -3.00% -3.00% 13.374 13.563 13.563 13.374
0+344.40 13.400 -3.00% -3.00% 13.373 13.562 13.562 13.373
0+345.80 13.399 -3.00% -3.00% 13.372 13.561 13.561 13.372
0+347.20 13.397 -3.00% -3.00% 13.370 13.559 13.559 13.370
0+348.60 13.396 -3.00% -3.00% 13.369 13.558 13.558 13.369
0+350.00 13.396 -3.00% -3.00% 13.369 13.558 13.558 13.369
0+351.40 13.395 -3.00% -3.00% 13.368 13.557 13.557 13.368
0+352.80 13.394 -3.00% -3.00% 13.367 13.556 13.556 13.367
0+354.20 13.393 -3.00% -3.00% 13.366 13.555 13.555 13.366
0+355.60 13.393 -3.00% -3.00% 13.366 13.555 13.555 13.366
0+357.00 13.392 -3.00% -3.00% 13.365 13.554 13.554 13.365
0+358.40 13.392 -3.00% -3.00% 13.365 13.554 13.554 13.365
0+359.80 13.392 -3.00% -3.00% 13.365 13.554 13.554 13.365
0+361.20 13.392 -3.00% -3.00% 13.365 13.554 13.554 13.365
0+362.60 13.392 -3.00% -3.00% 13.365 13.554 13.554 13.365
0+364.00 13.392 -3.00% -3.00% 13.365 13.554 13.554 13.365
0+365.40 13.392 -3.00% -3.00% 13.365 13.554 13.554 13.365
0+366.80 13.393 -3.00% -3.00% 13.366 13.555 13.555 13.366
0+368.20 13.393 -3.00% -3.00% 13.366 13.555 13.555 13.366
0+369.60 13.394 -3.00% -3.00% 13.367 13.556 13.556 13.367
0+371.00 13.394 -3.00% -3.00% 13.367 13.556 13.556 13.367
0+372.40 13.395 -3.00% -3.00% 13.368 13.557 13.557 13.368
0+373.80 13.396 -3.00% -3.00% 13.369 13.558 13.558 13.369
0+375.20 13.397 -3.00% -3.00% 13.370 13.559 13.559 13.370
0+376.60 13.398 -3.00% -3.00% 13.371 13.560 13.560 13.371

9 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+378.00 13.399 -3.00% -3.00% 13.372 13.561 13.561 13.372


0+379.40 13.401 -3.00% -3.00% 13.374 13.563 13.563 13.374
0+380.80 13.402 -3.00% -3.00% 13.375 13.564 13.564 13.375
0+382.20 13.404 -3.00% -3.00% 13.377 13.566 13.566 13.377
0+383.60 13.405 -3.00% -3.00% 13.378 13.567 13.567 13.378
0+385.00 13.407 -3.00% -3.00% 13.380 13.569 13.569 13.380
0+386.40 13.408 -3.00% -3.00% 13.381 13.570 13.570 13.381
0+387.80 13.410 -3.00% -3.00% 13.383 13.572 13.572 13.383
0+389.20 13.411 -3.00% -3.00% 13.384 13.573 13.573 13.384
0+390.60 13.413 -3.00% -3.00% 13.386 13.575 13.575 13.386
0+392.00 13.415 -3.00% -3.00% 13.388 13.577 13.577 13.388
0+393.40 13.416 -3.00% -3.00% 13.389 13.578 13.578 13.389
0+394.80 13.418 -3.00% -3.00% 13.391 13.580 13.580 13.391
0+396.20 13.419 -3.00% -3.00% 13.392 13.581 13.581 13.392
0+397.60 13.421 -3.00% -3.00% 13.394 13.583 13.583 13.394
0+399.00 13.423 -3.00% -3.00% 13.396 13.585 13.585 13.396
0+400.40 13.424 -3.00% -3.00% 13.397 13.586 13.586 13.397
0+401.80 13.426 -3.00% -3.00% 13.399 13.588 13.588 13.399
0+403.20 13.427 -3.00% -3.00% 13.400 13.589 13.589 13.400
0+404.60 13.429 -3.00% -3.00% 13.402 13.591 13.591 13.402
0+406.00 13.431 -3.00% -3.00% 13.404 13.593 13.593 13.404
0+407.40 13.432 -3.00% -3.00% 13.405 13.594 13.594 13.405
0+408.80 13.434 -3.00% -3.00% 13.407 13.596 13.596 13.407
0+410.20 13.435 -3.00% -3.00% 13.408 13.597 13.597 13.408
0+411.60 13.437 -3.00% -3.00% 13.410 13.599 13.599 13.410
0+413.00 13.439 -3.00% -3.00% 13.412 13.601 13.601 13.412
0+414.40 13.440 -3.00% -3.00% 13.413 13.602 13.602 13.413
0+415.80 13.442 -3.00% -3.00% 13.415 13.604 13.604 13.415
0+417.20 13.443 -3.00% -3.00% 13.416 13.605 13.605 13.416
0+418.60 13.445 -3.00% -3.00% 13.418 13.607 13.607 13.418

10 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+420.00 13.447 -3.00% -3.00% 13.420 13.609 13.609 13.420


0+421.40 13.448 -3.00% -3.00% 13.421 13.610 13.610 13.421
0+422.80 13.450 -3.00% -3.00% 13.423 13.612 13.612 13.423
0+424.20 13.451 -3.00% -3.00% 13.424 13.613 13.613 13.424
0+425.60 13.453 -3.00% -3.00% 13.426 13.615 13.615 13.426
0+427.00 13.455 -3.00% -3.00% 13.428 13.617 13.617 13.428
0+428.40 13.456 -3.00% -3.00% 13.429 13.618 13.618 13.429
0+429.80 13.458 -3.00% -3.00% 13.431 13.620 13.620 13.431
0+431.20 13.459 -3.00% -3.00% 13.432 13.621 13.621 13.432
0+432.60 13.461 -3.00% -3.00% 13.434 13.623 13.623 13.434
0+434.00 13.463 -3.00% -3.00% 13.436 13.625 13.625 13.436
0+435.40 13.464 -3.00% -3.00% 13.437 13.626 13.626 13.437
0+436.80 13.466 -3.00% -3.00% 13.439 13.628 13.628 13.439
0+438.20 13.467 -3.00% -3.00% 13.440 13.629 13.629 13.440
0+439.60 13.469 -3.00% -3.00% 13.442 13.631 13.631 13.442
0+441.00 13.471 -3.00% -3.00% 13.444 13.633 13.633 13.444
0+442.40 13.472 -3.00% -3.00% 13.445 13.634 13.634 13.445
0+443.80 13.474 -3.00% -3.00% 13.447 13.636 13.636 13.447
0+445.20 13.475 -3.00% -3.00% 13.448 13.637 13.637 13.448
0+446.60 13.477 -3.00% -3.00% 13.450 13.639 13.639 13.450
0+448.00 13.479 -3.00% -3.00% 13.452 13.641 13.641 13.452
0+449.40 13.480 -3.00% -3.00% 13.453 13.642 13.642 13.453
0+450.80 13.482 -3.00% -3.00% 13.455 13.644 13.644 13.455
0+452.20 13.483 -3.00% -3.00% 13.456 13.645 13.645 13.456
0+453.60 13.485 -3.00% -3.00% 13.458 13.647 13.647 13.458
0+455.00 13.487 -3.00% -3.00% 13.460 13.649 13.649 13.460
0+456.40 13.488 -3.00% -3.00% 13.461 13.650 13.650 13.461
0+457.80 13.490 -3.00% -3.00% 13.463 13.652 13.652 13.463
0+459.20 13.491 -3.00% -3.00% 13.464 13.653 13.653 13.464
0+460.60 13.493 -3.00% -3.00% 13.466 13.655 13.655 13.466

11 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+462.00 13.495 -3.00% -3.00% 13.468 13.657 13.657 13.468


0+463.40 13.496 -3.00% -3.00% 13.469 13.658 13.658 13.469
0+464.80 13.498 -3.00% -3.00% 13.471 13.660 13.660 13.471
0+466.20 13.499 -3.00% -3.00% 13.472 13.661 13.661 13.472
0+467.60 13.501 -3.00% -3.00% 13.474 13.663 13.663 13.474
0+469.00 13.503 -3.00% -3.00% 13.476 13.665 13.665 13.476
0+470.40 13.504 -3.00% -3.00% 13.477 13.666 13.666 13.477
0+471.80 13.506 -3.00% -3.00% 13.479 13.668 13.668 13.479
0+473.20 13.507 -3.00% -3.00% 13.480 13.669 13.669 13.480
0+474.60 13.509 -3.00% -3.00% 13.482 13.671 13.671 13.482
0+476.00 13.511 -3.00% -3.00% 13.484 13.673 13.673 13.484
0+477.40 13.512 -3.00% -3.00% 13.485 13.674 13.674 13.485
0+478.80 13.514 -3.00% -3.00% 13.487 13.676 13.676 13.487
0+480.20 13.515 -3.00% -3.00% 13.488 13.677 13.677 13.488
0+481.60 13.517 -3.00% -3.00% 13.490 13.679 13.679 13.490
0+483.00 13.519 -3.00% -3.00% 13.492 13.681 13.681 13.492
0+484.40 13.520 -3.00% -3.00% 13.493 13.682 13.682 13.493
0+485.80 13.522 -3.00% -3.00% 13.495 13.684 13.684 13.495
0+487.20 13.523 -3.00% -3.00% 13.496 13.685 13.685 13.496
0+488.60 13.525 -3.00% -3.00% 13.498 13.687 13.687 13.498
0+490.00 13.526 -3.00% -3.00% 13.499 13.688 13.688 13.499
0+491.40 13.528 -3.00% -3.00% 13.501 13.690 13.690 13.501
0+492.80 13.530 -3.00% -3.00% 13.503 13.692 13.692 13.503
0+494.20 13.531 -3.00% -3.00% 13.504 13.693 13.693 13.504
0+495.60 13.533 -3.00% -3.00% 13.506 13.695 13.695 13.506
0+497.00 13.534 -3.00% -3.00% 13.507 13.696 13.696 13.507
0+498.40 13.536 -3.00% -3.00% 13.509 13.698 13.698 13.509
0+499.80 13.538 -3.00% -3.00% 13.511 13.700 13.700 13.511
0+501.20 13.539 -3.00% -3.00% 13.512 13.701 13.701 13.512
0+502.60 13.541 -3.00% -3.00% 13.514 13.703 13.703 13.514

12 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+504.00 13.542 -3.00% -3.00% 13.515 13.704 13.704 13.515


0+505.40 13.544 -3.00% -3.00% 13.517 13.706 13.706 13.517
0+506.80 13.546 -3.00% -3.00% 13.519 13.708 13.708 13.519
0+508.20 13.547 -3.00% -3.00% 13.520 13.709 13.709 13.520
0+509.60 13.549 -3.00% -3.00% 13.522 13.711 13.711 13.522
0+511.00 13.550 -3.00% -3.00% 13.523 13.712 13.712 13.523
0+512.40 13.552 -3.00% -3.00% 13.525 13.714 13.714 13.525
0+513.80 13.554 -3.00% -3.00% 13.527 13.716 13.716 13.527
0+515.20 13.555 -3.00% -3.00% 13.528 13.717 13.717 13.528
0+516.60 13.557 -3.00% -3.00% 13.530 13.719 13.719 13.530
0+518.00 13.558 -3.00% -3.00% 13.531 13.720 13.720 13.531
0+519.40 13.560 -3.00% -3.00% 13.533 13.722 13.722 13.533
0+520.80 13.562 -3.00% -3.00% 13.535 13.724 13.724 13.535
0+522.20 13.563 -3.00% -3.00% 13.536 13.725 13.725 13.536
0+523.60 13.565 -3.00% -3.00% 13.538 13.727 13.727 13.538
0+525.00 13.566 -3.00% -3.00% 13.539 13.728 13.728 13.539
0+526.40 13.568 -3.00% -3.00% 13.541 13.730 13.730 13.541
0+527.80 13.570 -3.00% -3.00% 13.543 13.732 13.732 13.543
0+529.20 13.571 -3.00% -3.00% 13.544 13.733 13.733 13.544
0+530.60 13.573 -3.00% -3.00% 13.546 13.735 13.735 13.546
0+532.00 13.574 -3.00% -3.00% 13.547 13.736 13.736 13.547
0+533.40 13.576 -3.00% -3.00% 13.549 13.738 13.738 13.549
0+534.80 13.578 -3.00% -3.00% 13.551 13.740 13.740 13.551
0+536.20 13.579 -3.00% -3.00% 13.552 13.741 13.741 13.552
0+537.60 13.581 -3.00% -3.00% 13.554 13.743 13.743 13.554
0+539.00 13.582 -3.00% -3.00% 13.555 13.744 13.744 13.555
0+540.40 13.584 -3.00% -3.00% 13.557 13.746 13.746 13.557
0+541.80 13.586 -3.00% -3.00% 13.559 13.748 13.748 13.559
0+543.20 13.587 -3.00% -3.00% 13.560 13.749 13.749 13.560
0+544.60 13.589 -3.00% -3.00% 13.562 13.751 13.751 13.562

13 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+546.00 13.590 -3.00% -3.00% 13.563 13.752 13.752 13.563


0+547.40 13.592 -3.00% -3.00% 13.565 13.754 13.754 13.565
0+548.80 13.594 -3.00% -3.00% 13.567 13.756 13.756 13.567
0+550.20 13.595 -3.00% -3.00% 13.568 13.757 13.757 13.568
0+551.60 13.597 -3.00% -3.00% 13.570 13.759 13.759 13.570
0+553.00 13.598 -3.00% -3.00% 13.571 13.760 13.760 13.571
0+554.40 13.600 -3.00% -3.00% 13.573 13.762 13.762 13.573
0+555.80 13.602 -3.00% -3.00% 13.575 13.764 13.764 13.575
0+557.20 13.603 -3.00% -3.00% 13.576 13.765 13.765 13.576
0+558.60 13.605 -3.00% -3.00% 13.578 13.767 13.767 13.578
0+560.00 13.606 -3.00% -3.00% 13.579 13.768 13.768 13.579
0+561.40 13.608 -3.00% -3.00% 13.581 13.770 13.770 13.581
0+562.80 13.610 -3.00% -3.00% 13.583 13.772 13.772 13.583
0+564.20 13.611 -3.00% -3.00% 13.584 13.773 13.773 13.584
0+565.60 13.613 -3.00% -3.00% 13.586 13.775 13.775 13.586
0+567.00 13.614 -3.00% -3.00% 13.587 13.776 13.776 13.587
0+568.40 13.616 -3.00% -3.00% 13.589 13.778 13.778 13.589
0+569.80 13.618 -3.00% -3.00% 13.591 13.780 13.780 13.591
0+571.20 13.619 -3.00% -3.00% 13.592 13.781 13.781 13.592
0+572.60 13.621 -3.00% -3.00% 13.594 13.783 13.783 13.594
0+574.00 13.622 -3.00% -3.00% 13.595 13.784 13.784 13.595
0+575.40 13.624 -3.00% -3.00% 13.597 13.786 13.786 13.597
0+576.80 13.626 -3.00% -3.00% 13.599 13.788 13.788 13.599
0+578.20 13.627 -3.00% -3.00% 13.600 13.789 13.789 13.600
0+579.60 13.629 -3.00% -3.00% 13.602 13.791 13.791 13.602
0+581.00 13.630 -3.00% -3.00% 13.603 13.792 13.792 13.603
0+582.40 13.632 -3.00% -3.00% 13.605 13.794 13.794 13.605
0+583.80 13.633 -3.00% -3.00% 13.606 13.795 13.795 13.606
0+585.20 13.635 -3.00% -3.00% 13.608 13.797 13.797 13.608
0+586.60 13.637 -3.00% -3.00% 13.610 13.799 13.799 13.610

14 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+588.00 13.638 -3.00% -3.00% 13.611 13.800 13.800 13.611


0+589.40 13.640 -3.00% -3.00% 13.613 13.802 13.802 13.613
0+590.80 13.641 -3.00% -3.00% 13.614 13.803 13.803 13.614
0+592.20 13.643 -3.00% -3.00% 13.616 13.805 13.805 13.616
0+593.60 13.645 -3.00% -3.00% 13.618 13.807 13.807 13.618
0+595.00 13.646 -3.00% -3.00% 13.619 13.808 13.808 13.619
0+596.40 13.648 -3.00% -3.00% 13.621 13.810 13.810 13.621
0+597.80 13.649 -3.00% -3.00% 13.622 13.811 13.811 13.622
0+599.20 13.651 -3.00% -3.00% 13.624 13.813 13.813 13.624
0+600.60 13.653 -3.00% -3.00% 13.626 13.815 13.815 13.626
0+602.00 13.654 -3.00% -3.00% 13.627 13.816 13.816 13.627
0+603.40 13.656 -3.00% -3.00% 13.629 13.818 13.818 13.629
0+604.80 13.657 -3.00% -3.00% 13.630 13.819 13.819 13.630
0+606.20 13.659 -3.00% -3.00% 13.632 13.821 13.821 13.632
0+607.60 13.661 -3.00% -3.00% 13.634 13.823 13.823 13.634
0+609.00 13.662 -3.00% -3.00% 13.635 13.824 13.824 13.635
0+610.40 13.664 -3.00% -3.00% 13.637 13.826 13.826 13.637
0+611.80 13.665 -3.00% -3.00% 13.638 13.827 13.827 13.638
0+613.20 13.667 -3.00% -3.00% 13.640 13.829 13.829 13.640
0+614.60 13.669 -3.00% -3.00% 13.642 13.831 13.831 13.642
0+616.00 13.670 -3.00% -3.00% 13.643 13.832 13.832 13.643
0+617.40 13.672 -3.00% -3.00% 13.645 13.834 13.834 13.645
0+618.80 13.673 -3.00% -3.00% 13.646 13.835 13.835 13.646
0+620.20 13.675 -3.00% -3.00% 13.648 13.837 13.837 13.648
0+621.60 13.677 -3.00% -3.00% 13.650 13.839 13.839 13.650
0+623.00 13.678 -3.00% -3.00% 13.651 13.840 13.840 13.651
0+624.40 13.680 -3.00% -3.00% 13.653 13.842 13.842 13.653
0+625.80 13.681 -3.00% -3.00% 13.654 13.843 13.843 13.654
0+627.20 13.683 -3.00% -3.00% 13.656 13.845 13.845 13.656
0+628.60 13.685 -3.00% -3.00% 13.658 13.847 13.847 13.658

15 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+630.00 13.686 -3.00% -3.00% 13.659 13.848 13.848 13.659


0+631.40 13.688 -3.00% -3.00% 13.661 13.850 13.850 13.661
0+632.80 13.689 -3.00% -3.00% 13.662 13.851 13.851 13.662
0+634.20 13.691 -3.00% -3.00% 13.664 13.853 13.853 13.664
0+635.60 13.693 -3.00% -3.00% 13.666 13.855 13.855 13.666
0+637.00 13.694 -3.00% -3.00% 13.667 13.856 13.856 13.667
0+638.40 13.696 -3.00% -3.00% 13.669 13.858 13.858 13.669
0+639.80 13.697 -3.00% -3.00% 13.670 13.859 13.859 13.670
0+641.20 13.699 -3.00% -3.00% 13.672 13.861 13.861 13.672
0+642.60 13.701 -3.00% -3.00% 13.674 13.863 13.863 13.674
0+644.00 13.702 -3.00% -3.00% 13.675 13.864 13.864 13.675
0+645.40 13.704 -3.00% -3.00% 13.677 13.866 13.866 13.677
0+646.80 13.705 -3.00% -3.00% 13.678 13.867 13.867 13.678
0+648.20 13.707 -3.00% -3.00% 13.680 13.869 13.869 13.680
0+649.60 13.708 -3.00% -3.00% 13.681 13.870 13.870 13.681
0+651.00 13.710 -3.00% -3.00% 13.683 13.872 13.872 13.683
0+652.40 13.711 -3.00% -3.00% 13.684 13.873 13.873 13.684
0+653.80 13.712 -3.00% -3.00% 13.685 13.874 13.874 13.685
0+655.20 13.714 -3.00% -3.00% 13.687 13.876 13.876 13.687
0+656.60 13.715 -3.00% -3.00% 13.688 13.877 13.877 13.688
0+658.00 13.716 -3.00% -3.00% 13.689 13.878 13.878 13.689
0+659.40 13.718 -3.00% -3.00% 13.691 13.880 13.880 13.691
0+660.80 13.719 -3.00% -3.00% 13.692 13.881 13.881 13.692
0+662.20 13.720 -3.00% -3.00% 13.693 13.882 13.882 13.693
0+663.60 13.721 -3.00% -3.00% 13.694 13.883 13.883 13.694
0+665.00 13.722 -3.00% -3.00% 13.695 13.884 13.884 13.695
0+666.40 13.724 -3.00% -3.00% 13.697 13.886 13.886 13.697
0+667.80 13.725 -3.00% -3.00% 13.698 13.887 13.887 13.698
0+669.20 13.726 -3.00% -3.00% 13.699 13.888 13.888 13.699
0+670.60 13.727 -3.00% -3.00% 13.700 13.889 13.889 13.700

16 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+672.00 13.728 -3.00% -3.00% 13.701 13.890 13.890 13.701


0+673.40 13.729 -3.00% -3.00% 13.702 13.891 13.891 13.702
0+674.80 13.730 -3.00% -3.00% 13.703 13.892 13.892 13.703
0+676.20 13.731 -3.00% -3.00% 13.704 13.893 13.893 13.704
0+677.60 13.732 -3.00% -3.00% 13.705 13.894 13.894 13.705
0+679.00 13.733 -3.00% -3.00% 13.706 13.895 13.895 13.706
0+680.40 13.734 -3.00% -3.00% 13.707 13.896 13.896 13.707
0+681.80 13.735 -3.00% -3.00% 13.708 13.897 13.897 13.708
0+683.20 13.735 -3.00% -3.00% 13.708 13.897 13.897 13.708
0+684.60 13.736 -3.00% -3.00% 13.709 13.898 13.898 13.709
0+686.00 13.737 -3.00% -3.00% 13.710 13.899 13.899 13.710
0+687.40 13.738 -3.00% -3.00% 13.711 13.900 13.900 13.711
0+688.80 13.739 -3.00% -3.00% 13.712 13.901 13.901 13.712
0+690.20 13.739 -3.00% -3.00% 13.712 13.901 13.901 13.712
0+691.60 13.740 -3.00% -3.00% 13.713 13.902 13.902 13.713
0+693.00 13.741 -3.00% -3.00% 13.714 13.903 13.903 13.714
0+694.40 13.741 -3.00% -3.00% 13.714 13.903 13.903 13.714
0+695.80 13.742 -3.00% -3.00% 13.715 13.904 13.904 13.715
0+697.20 13.742 -3.00% -3.00% 13.715 13.904 13.904 13.715
0+698.60 13.743 -3.00% -3.00% 13.716 13.905 13.905 13.716
0+700.00 13.744 -3.00% -3.00% 13.717 13.906 13.906 13.717
0+701.40 13.744 -3.00% -3.00% 13.717 13.906 13.906 13.717
0+702.80 13.745 -3.00% -3.00% 13.718 13.907 13.907 13.718
0+704.20 13.745 -3.00% -3.00% 13.718 13.907 13.907 13.718
0+705.60 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+707.00 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+708.40 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+709.80 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+711.20 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+712.60 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720

17 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+714.00 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721


0+715.40 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+716.80 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+718.20 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+719.60 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+721.00 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+722.40 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+723.80 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+725.20 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+726.60 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+728.00 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+729.40 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+730.80 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+732.20 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+733.60 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+735.00 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+736.40 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+737.80 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+739.20 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+740.60 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+742.00 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+743.40 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+744.80 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+746.20 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+747.60 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+749.00 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+750.40 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+751.80 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+753.20 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+754.60 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722

18 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+756.00 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722


0+757.40 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+758.80 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+760.20 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+761.60 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+763.00 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+764.40 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+765.80 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+767.20 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+768.60 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+770.00 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+771.40 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+772.80 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
0+774.20 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+775.60 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+777.00 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+778.40 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+779.80 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+781.20 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+782.60 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+784.00 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+785.40 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+786.80 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+788.20 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+789.60 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+791.00 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+792.40 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+793.80 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+795.20 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+796.60 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721

19 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+798.00 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721


0+799.40 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+800.80 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+802.20 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+803.60 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+805.00 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+806.40 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+807.80 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+809.20 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+810.60 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+812.00 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+813.40 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+814.80 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+816.20 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+817.60 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+819.00 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+820.40 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+821.80 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+823.20 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+824.60 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+826.00 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+827.40 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+828.80 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+830.20 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+831.60 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
0+833.00 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+834.40 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+835.80 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+837.20 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+838.60 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720

20 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+840.00 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720


0+841.40 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+842.80 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+844.20 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+845.60 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+847.00 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+848.40 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+849.80 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+851.20 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+852.60 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+854.00 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+855.40 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+856.80 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+858.20 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+859.60 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+861.00 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+862.40 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+863.80 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+865.20 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+866.60 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+868.00 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+869.40 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+870.80 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+872.20 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+873.60 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+875.00 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+876.40 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+877.80 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+879.20 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+880.60 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720

21 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+882.00 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720


0+883.40 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+884.80 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+886.20 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+887.60 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+889.00 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+890.40 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
0+891.80 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+893.20 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+894.60 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+896.00 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+897.40 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+898.80 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+900.20 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+901.60 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+903.00 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+904.40 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+905.80 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+907.20 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+908.60 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+910.00 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+911.40 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+912.80 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+914.20 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+915.60 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+917.00 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+918.40 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
0+919.80 13.746 -3.00% -2.90% 13.719 13.908 13.907 13.724
0+921.20 13.746 -3.00% -2.79% 13.719 13.908 13.905 13.729
0+922.60 13.746 -3.00% -2.69% 13.719 13.908 13.904 13.734

22 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+924.00 13.746 -3.00% -2.58% 13.719 13.908 13.902 13.740


0+925.40 13.746 -3.00% -2.47% 13.719 13.908 13.901 13.745
0+926.80 13.746 -3.00% -2.36% 13.719 13.908 13.899 13.750
0+928.20 13.746 -3.00% -2.26% 13.719 13.908 13.898 13.755
0+929.60 13.746 -3.00% -2.15% 13.719 13.908 13.896 13.761
0+931.00 13.746 -3.00% -2.04% 13.719 13.908 13.895 13.766
0+932.40 13.746 -3.00% -1.93% 13.719 13.908 13.893 13.771
0+933.80 13.746 -3.00% -1.83% 13.719 13.908 13.892 13.777
0+935.20 13.746 -3.00% -1.72% 13.719 13.908 13.890 13.782
0+936.60 13.746 -3.00% -1.61% 13.719 13.908 13.889 13.787
0+938.00 13.746 -3.00% -1.50% 13.719 13.908 13.887 13.792
0+939.40 13.746 -3.00% -1.39% 13.719 13.908 13.886 13.798
0+940.80 13.746 -3.00% -1.29% 13.719 13.908 13.884 13.803
0+942.20 13.746 -3.00% -1.18% 13.719 13.908 13.883 13.808
0+943.60 13.746 -3.00% -1.07% 13.719 13.908 13.881 13.813
0+945.00 13.746 -3.00% -0.96% 13.719 13.908 13.879 13.819
0+946.40 13.746 -3.00% -0.86% 13.719 13.908 13.878 13.824
0+947.80 13.746 -3.00% -0.75% 13.719 13.908 13.876 13.829
0+949.20 13.746 -3.00% -0.64% 13.719 13.908 13.875 13.835
0+950.60 13.745 -3.00% -0.53% 13.718 13.907 13.872 13.839
0+952.00 13.745 -3.00% -0.43% 13.718 13.907 13.871 13.844
0+953.40 13.745 -3.00% -0.32% 13.718 13.907 13.869 13.849
0+954.80 13.745 -3.00% -0.21% 13.718 13.907 13.868 13.855
0+956.20 13.745 -3.00% -0.10% 13.718 13.907 13.866 13.860
0+957.60 13.745 -3.00% 0.01% 13.718 13.907 13.865 13.865
0+959.00 13.745 -3.00% 0.11% 13.718 13.907 13.863 13.871
0+960.40 13.745 -3.00% 0.22% 13.718 13.907 13.862 13.876
0+961.80 13.745 -3.00% 0.33% 13.718 13.907 13.860 13.881
0+963.20 13.745 -3.00% 0.44% 13.718 13.907 13.859 13.886
0+964.60 13.745 -3.00% 0.54% 13.718 13.907 13.857 13.892

23 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

0+966.00 13.745 -3.00% 0.65% 13.718 13.907 13.856 13.897


0+967.40 13.745 -3.00% 0.76% 13.718 13.907 13.854 13.902
0+968.80 13.745 -3.00% 0.87% 13.718 13.907 13.853 13.907
0+970.20 13.745 -3.00% 0.97% 13.718 13.907 13.851 13.913
0+971.60 13.745 -3.00% 1.08% 13.718 13.907 13.850 13.918
0+973.00 13.745 -3.00% 1.19% 13.718 13.907 13.848 13.923
0+974.40 13.745 -3.00% 1.30% 13.718 13.907 13.847 13.929
0+975.80 13.745 -3.00% 1.41% 13.718 13.907 13.845 13.934
0+977.20 13.745 -3.00% 1.51% 13.718 13.907 13.844 13.939
0+978.60 13.745 -3.00% 1.62% 13.718 13.907 13.842 13.944
0+980.00 13.745 -3.00% 1.73% 13.718 13.907 13.841 13.950
0+981.40 13.745 -3.00% 1.84% 13.718 13.907 13.839 13.955
0+982.80 13.745 -3.00% 1.94% 13.718 13.907 13.838 13.960
0+984.20 13.745 -3.00% 2.05% 13.718 13.907 13.836 13.966
0+985.60 13.745 -3.00% 2.16% 13.718 13.907 13.835 13.971
0+987.00 13.745 -3.00% 2.27% 13.718 13.907 13.833 13.976
0+988.40 13.745 -3.00% 2.37% 13.718 13.907 13.832 13.981
0+989.80 13.745 -3.00% 2.48% 13.718 13.907 13.830 13.987
0+991.20 13.745 -3.00% 2.59% 13.718 13.907 13.829 13.992
0+992.60 13.745 -3.00% 2.70% 13.718 13.907 13.827 13.997
0+994.00 13.745 -3.00% 2.81% 13.718 13.907 13.826 14.002
0+995.40 13.745 -3.00% 2.91% 13.718 13.907 13.824 14.008
0+996.80 13.745 -3.00% 3.00% 13.718 13.907 13.823 14.012
0+998.20 13.745 -3.00% 3.00% 13.718 13.907 13.823 14.012
0+999.60 13.745 -3.00% 3.00% 13.718 13.907 13.823 14.012
1+001.00 13.745 -3.00% 3.00% 13.718 13.907 13.823 14.012
1+002.40 13.745 -3.00% 3.00% 13.718 13.907 13.823 14.012
1+003.80 13.745 -3.00% 3.00% 13.718 13.907 13.823 14.012
1+005.20 13.745 -3.00% 3.00% 13.718 13.907 13.823 14.012
1+006.60 13.745 -3.00% 3.00% 13.718 13.907 13.823 14.012

24 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+008.00 13.745 -3.00% 3.00% 13.718 13.907 13.823 14.012


1+009.40 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+010.80 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+012.20 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+013.60 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+015.00 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+016.40 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+017.80 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+019.20 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+020.60 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+022.00 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+023.40 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+024.80 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+026.20 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+027.60 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+029.00 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+030.40 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+031.80 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+033.20 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+034.60 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+036.00 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+037.40 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+038.80 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+040.20 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+041.60 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+043.00 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+044.40 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+045.80 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+047.20 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+048.60 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011

25 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+050.00 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011


1+051.40 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+052.80 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+054.20 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+055.60 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+057.00 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+058.40 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+059.80 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+061.20 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+062.60 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+064.00 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+065.40 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+066.80 13.744 -3.00% 3.00% 13.717 13.906 13.822 14.011
1+068.20 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+069.60 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+071.00 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+072.40 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+073.80 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+075.20 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+076.60 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+078.00 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+079.40 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+080.80 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+082.20 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+083.60 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+085.00 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+086.40 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+087.80 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+089.20 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+090.60 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010

26 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+092.00 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010


1+093.40 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+094.80 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+096.20 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+097.60 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+099.00 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+100.40 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+101.80 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+103.20 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+104.60 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+106.00 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+107.40 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+108.80 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+110.20 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+111.60 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+113.00 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+114.40 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+115.80 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+117.20 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+118.60 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+120.00 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+121.40 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+122.80 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+124.20 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+125.60 13.743 -3.00% 3.00% 13.716 13.905 13.821 14.010
1+127.00 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+128.40 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+129.80 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+131.20 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+132.60 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009

27 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+134.00 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009


1+135.40 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+136.80 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+138.20 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+139.60 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+141.00 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+142.40 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+143.80 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+145.20 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+146.60 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+148.00 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+149.40 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+150.80 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+152.20 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+153.60 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+155.00 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+156.40 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+157.80 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+159.20 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+160.60 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+162.00 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+163.40 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+164.80 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+166.20 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+167.60 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+169.00 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+170.40 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+171.80 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+173.20 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+174.60 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009

28 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+176.00 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009


1+177.40 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+178.80 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+180.20 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+181.60 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+183.00 13.742 -3.00% 3.00% 13.715 13.904 13.820 14.009
1+184.40 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+185.80 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+187.20 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+188.60 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+190.00 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+191.40 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+192.80 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+194.20 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+195.60 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+197.00 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+198.40 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+199.80 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+201.20 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+202.60 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+204.00 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+205.40 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+206.80 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+208.20 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+209.60 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+211.00 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+212.40 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+213.80 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+215.20 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+216.60 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008

29 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+218.00 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008


1+219.40 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+220.80 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+222.20 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+223.60 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+225.00 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+226.40 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+227.80 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+229.20 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+230.60 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+232.00 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+233.40 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+234.80 13.741 -3.00% 3.00% 13.714 13.903 13.819 14.008
1+236.20 13.740 -3.00% 3.00% 13.713 13.902 13.818 14.007
1+237.60 13.740 -3.00% 3.00% 13.713 13.902 13.818 14.007
1+239.00 13.740 -3.00% 3.00% 13.713 13.902 13.818 14.007
1+240.40 13.740 -3.00% 3.00% 13.713 13.902 13.818 14.007
1+241.80 13.740 -3.00% 3.00% 13.713 13.902 13.818 14.007
1+243.20 13.739 -3.00% 3.00% 13.712 13.901 13.817 14.006
1+244.60 13.739 -3.00% 3.00% 13.712 13.901 13.817 14.006
1+246.00 13.739 -3.00% 3.00% 13.712 13.901 13.817 14.006
1+247.40 13.738 -3.00% 3.00% 13.711 13.900 13.816 14.005
1+248.80 13.738 -3.00% 3.00% 13.711 13.900 13.816 14.005
1+250.20 13.737 -3.00% 3.00% 13.710 13.899 13.815 14.004
1+251.60 13.737 -3.00% 3.00% 13.710 13.899 13.815 14.004
1+253.00 13.736 -3.00% 3.00% 13.709 13.898 13.814 14.003
1+254.40 13.736 -3.00% 3.00% 13.709 13.898 13.814 14.003
1+255.80 13.735 -3.00% 3.00% 13.708 13.897 13.813 14.002
1+257.20 13.734 -3.00% 3.00% 13.707 13.896 13.812 14.001
1+258.60 13.734 -3.00% 3.00% 13.707 13.896 13.812 14.001

30 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+260.00 13.733 -3.00% 3.00% 13.706 13.895 13.811 14.000


1+261.40 13.732 -3.00% 3.00% 13.705 13.894 13.810 13.999
1+262.80 13.731 -3.00% 3.00% 13.704 13.893 13.809 13.998
1+264.20 13.730 -3.00% 3.00% 13.703 13.892 13.808 13.997
1+265.60 13.730 -3.00% 2.96% 13.703 13.892 13.809 13.995
1+267.00 13.729 -3.00% 2.86% 13.702 13.891 13.809 13.989
1+268.40 13.728 -3.00% 2.75% 13.701 13.890 13.810 13.983
1+269.80 13.727 -3.00% 2.64% 13.700 13.889 13.810 13.976
1+271.20 13.726 -3.00% 2.53% 13.699 13.888 13.811 13.970
1+272.60 13.724 -3.00% 2.42% 13.697 13.886 13.810 13.963
1+274.00 13.723 -3.00% 2.32% 13.696 13.885 13.811 13.957
1+275.40 13.722 -3.00% 2.21% 13.695 13.884 13.811 13.950
1+276.80 13.721 -3.00% 2.10% 13.694 13.883 13.812 13.944
1+278.20 13.720 -3.00% 1.99% 13.693 13.882 13.812 13.938
1+279.60 13.718 -3.00% 1.89% 13.691 13.880 13.812 13.930
1+281.00 13.717 -3.00% 1.78% 13.690 13.879 13.812 13.924
1+282.40 13.716 -3.00% 1.67% 13.689 13.878 13.813 13.918
1+283.80 13.714 -3.00% 1.56% 13.687 13.876 13.812 13.911
1+285.20 13.713 -3.00% 1.46% 13.686 13.875 13.813 13.904
1+286.60 13.712 -3.00% 1.35% 13.685 13.874 13.813 13.898
1+288.00 13.710 -3.00% 1.24% 13.683 13.872 13.813 13.891
1+289.40 13.709 -3.00% 1.13% 13.682 13.871 13.813 13.884
1+290.80 13.707 -3.00% 1.02% 13.680 13.869 13.813 13.877
1+292.20 13.705 -3.00% 0.92% 13.678 13.867 13.812 13.870
1+293.60 13.704 -3.00% 0.81% 13.677 13.866 13.813 13.864
1+295.00 13.702 -3.00% 0.70% 13.675 13.864 13.812 13.856
1+296.40 13.700 -3.00% 0.59% 13.673 13.862 13.812 13.849
1+297.80 13.699 -3.00% 0.49% 13.672 13.861 13.812 13.843
1+299.20 13.697 -3.00% 0.38% 13.670 13.859 13.812 13.836
1+300.60 13.695 -3.00% 0.27% 13.668 13.857 13.811 13.828

31 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+302.00 13.693 -3.00% 0.16% 13.666 13.855 13.811 13.821


1+303.40 13.691 -3.00% 0.06% 13.664 13.853 13.810 13.814
1+304.80 13.689 -3.00% -0.05% 13.662 13.851 13.810 13.806
1+306.20 13.687 -3.00% -0.16% 13.660 13.849 13.809 13.799
1+307.60 13.685 -3.00% -0.27% 13.658 13.847 13.809 13.792
1+309.00 13.683 -3.00% -0.38% 13.656 13.845 13.808 13.785
1+310.40 13.681 -3.00% -0.48% 13.654 13.843 13.808 13.777
1+311.80 13.679 -3.00% -0.59% 13.652 13.841 13.807 13.770
1+313.20 13.677 -3.00% -0.70% 13.650 13.839 13.807 13.763
1+314.60 13.675 -3.00% -0.81% 13.648 13.837 13.806 13.755
1+316.00 13.672 -3.00% -0.91% 13.645 13.834 13.805 13.747
1+317.40 13.670 -3.00% -1.02% 13.643 13.832 13.804 13.740
1+318.80 13.668 -3.00% -1.13% 13.641 13.830 13.804 13.733
1+320.20 13.666 -3.00% -1.24% 13.639 13.828 13.803 13.725
1+321.60 13.664 -3.00% -1.34% 13.637 13.826 13.803 13.718
1+323.00 13.662 -3.00% -1.45% 13.635 13.824 13.802 13.711
1+324.40 13.659 -3.00% -1.56% 13.632 13.821 13.801 13.703
1+325.80 13.657 -3.00% -1.67% 13.630 13.819 13.800 13.695
1+327.20 13.655 -3.00% -1.78% 13.628 13.817 13.800 13.688
1+328.60 13.653 -3.00% -1.88% 13.626 13.815 13.799 13.681
1+330.00 13.651 -3.00% -1.99% 13.624 13.813 13.799 13.673
1+331.40 13.649 -3.00% -2.10% 13.622 13.811 13.798 13.666
1+332.80 13.646 -3.00% -2.21% 13.619 13.808 13.797 13.658
1+334.20 13.644 -3.00% -2.31% 13.617 13.806 13.796 13.651
1+335.60 13.642 -3.00% -2.42% 13.615 13.804 13.796 13.643
1+337.00 13.640 -3.00% -2.53% 13.613 13.802 13.795 13.636
1+338.40 13.638 -3.00% -2.64% 13.611 13.800 13.795 13.629
1+339.80 13.636 -3.00% -2.74% 13.609 13.798 13.794 13.622
1+341.20 13.633 -3.00% -2.85% 13.606 13.795 13.793 13.613
1+342.60 13.631 -3.00% -2.96% 13.604 13.793 13.792 13.606

32 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+344.00 13.629 -3.00% -3.00% 13.602 13.791 13.791 13.602


1+345.40 13.627 -3.00% -3.00% 13.600 13.789 13.789 13.600
1+346.80 13.625 -3.00% -3.00% 13.598 13.787 13.787 13.598
1+348.20 13.623 -3.00% -3.00% 13.596 13.785 13.785 13.596
1+349.60 13.620 -3.00% -3.00% 13.593 13.782 13.782 13.593
1+351.00 13.618 -3.00% -3.00% 13.591 13.780 13.780 13.591
1+352.40 13.616 -3.00% -3.00% 13.589 13.778 13.778 13.589
1+353.80 13.614 -3.00% -3.00% 13.587 13.776 13.776 13.587
1+355.20 13.612 -3.00% -3.00% 13.585 13.774 13.774 13.585
1+356.60 13.610 -3.00% -3.00% 13.583 13.772 13.772 13.583
1+358.00 13.607 -3.00% -3.00% 13.580 13.769 13.769 13.580
1+359.40 13.605 -3.00% -3.00% 13.578 13.767 13.767 13.578
1+360.80 13.603 -3.00% -3.00% 13.576 13.765 13.765 13.576
1+362.20 13.601 -3.00% -3.00% 13.574 13.763 13.763 13.574
1+363.60 13.599 -3.00% -3.00% 13.572 13.761 13.761 13.572
1+365.00 13.597 -3.00% -3.00% 13.570 13.759 13.759 13.570
1+366.40 13.594 -3.00% -3.00% 13.567 13.756 13.756 13.567
1+367.80 13.592 -3.00% -3.00% 13.565 13.754 13.754 13.565
1+369.20 13.590 -3.00% -3.00% 13.563 13.752 13.752 13.563
1+370.60 13.588 -3.00% -3.00% 13.561 13.750 13.750 13.561
1+372.00 13.586 -3.00% -3.00% 13.559 13.748 13.748 13.559
1+373.40 13.584 -3.00% -3.00% 13.557 13.746 13.746 13.557
1+374.80 13.581 -3.00% -3.00% 13.554 13.743 13.743 13.554
1+376.20 13.579 -3.00% -3.00% 13.552 13.741 13.741 13.552
1+377.60 13.577 -3.00% -3.00% 13.550 13.739 13.739 13.550
1+379.00 13.575 -3.00% -3.00% 13.548 13.737 13.737 13.548
1+380.40 13.573 -3.00% -3.00% 13.546 13.735 13.735 13.546
1+381.80 13.571 -3.00% -3.00% 13.544 13.733 13.733 13.544
1+383.20 13.568 -3.00% -3.00% 13.541 13.730 13.730 13.541
1+384.60 13.566 -3.00% -3.00% 13.539 13.728 13.728 13.539

33 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+386.00 13.564 -3.00% -3.00% 13.537 13.726 13.726 13.537


1+387.40 13.562 -3.00% -3.00% 13.535 13.724 13.724 13.535
1+388.80 13.560 -3.00% -3.00% 13.533 13.722 13.722 13.533
1+390.20 13.558 -3.00% -3.00% 13.531 13.720 13.720 13.531
1+391.60 13.555 -3.00% -3.00% 13.528 13.717 13.717 13.528
1+393.00 13.553 -3.00% -3.00% 13.526 13.715 13.715 13.526
1+394.40 13.551 -3.00% -3.00% 13.524 13.713 13.713 13.524
1+395.80 13.549 -3.00% -3.00% 13.522 13.711 13.711 13.522
1+397.20 13.547 -3.00% -3.00% 13.520 13.709 13.709 13.520
1+398.60 13.544 -3.00% -3.00% 13.517 13.706 13.706 13.517
1+400.00 13.542 -3.00% -3.00% 13.515 13.704 13.704 13.515
1+401.40 13.540 -3.00% -3.00% 13.513 13.702 13.702 13.513
1+402.80 13.538 -3.00% -3.00% 13.511 13.700 13.700 13.511
1+404.20 13.536 -3.00% -3.00% 13.509 13.698 13.698 13.509
1+405.60 13.534 -3.00% -3.00% 13.507 13.696 13.696 13.507
1+407.00 13.531 -3.00% -3.00% 13.504 13.693 13.693 13.504
1+408.40 13.529 -3.00% -3.00% 13.502 13.691 13.691 13.502
1+409.80 13.527 -3.00% -3.00% 13.500 13.689 13.689 13.500
1+411.20 13.525 -3.00% -3.00% 13.498 13.687 13.687 13.498
1+412.60 13.523 -3.00% -3.00% 13.496 13.685 13.685 13.496
1+414.00 13.521 -3.00% -3.00% 13.494 13.683 13.683 13.494
1+415.40 13.518 -3.00% -3.00% 13.491 13.680 13.680 13.491
1+416.80 13.516 -3.00% -3.00% 13.489 13.678 13.678 13.489
1+418.20 13.514 -3.00% -3.00% 13.487 13.676 13.676 13.487
1+419.60 13.512 -3.00% -3.00% 13.485 13.674 13.674 13.485
1+421.00 13.510 -3.00% -3.00% 13.483 13.672 13.672 13.483
1+422.40 13.508 -3.00% -3.00% 13.481 13.670 13.670 13.481
1+423.80 13.505 -3.00% -3.00% 13.478 13.667 13.667 13.478
1+425.20 13.503 -3.00% -3.00% 13.476 13.665 13.665 13.476
1+426.60 13.501 -3.00% -3.00% 13.474 13.663 13.663 13.474

34 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+428.00 13.499 -3.00% -3.00% 13.472 13.661 13.661 13.472


1+429.40 13.497 -3.00% -3.00% 13.470 13.659 13.659 13.470
1+430.80 13.495 -3.00% -3.00% 13.468 13.657 13.657 13.468
1+432.20 13.492 -3.00% -3.00% 13.465 13.654 13.654 13.465
1+433.60 13.490 -3.00% -3.00% 13.463 13.652 13.652 13.463
1+435.00 13.488 -3.00% -3.00% 13.461 13.650 13.650 13.461
1+436.40 13.486 -3.00% -3.00% 13.459 13.648 13.648 13.459
1+437.80 13.484 -3.00% -3.00% 13.457 13.646 13.646 13.457
1+439.20 13.482 -3.00% -3.00% 13.455 13.644 13.644 13.455
1+440.60 13.479 -3.00% -3.00% 13.452 13.641 13.641 13.452
1+442.00 13.477 -3.00% -3.00% 13.450 13.639 13.639 13.450
1+443.40 13.475 -3.00% -3.00% 13.448 13.637 13.637 13.448
1+444.80 13.473 -3.00% -3.00% 13.446 13.635 13.635 13.446
1+446.20 13.471 -3.00% -3.00% 13.444 13.633 13.633 13.444
1+447.60 13.469 -3.00% -3.00% 13.442 13.631 13.631 13.442
1+449.00 13.466 -3.00% -3.00% 13.439 13.628 13.628 13.439
1+450.40 13.464 -3.00% -3.00% 13.437 13.626 13.626 13.437
1+451.80 13.462 -3.00% -3.00% 13.435 13.624 13.624 13.435
1+453.20 13.460 -3.00% -3.00% 13.433 13.622 13.622 13.433
1+454.60 13.458 -3.00% -3.00% 13.431 13.620 13.620 13.431
1+456.00 13.456 -3.00% -3.00% 13.429 13.618 13.618 13.429
1+457.40 13.453 -3.00% -3.00% 13.426 13.615 13.615 13.426
1+458.80 13.451 -3.00% -3.00% 13.424 13.613 13.613 13.424
1+460.20 13.449 -3.00% -3.00% 13.422 13.611 13.611 13.422
1+461.60 13.447 -3.00% -3.00% 13.420 13.609 13.609 13.420
1+463.00 13.445 -3.00% -3.00% 13.418 13.607 13.607 13.418
1+464.40 13.443 -3.00% -3.00% 13.416 13.605 13.605 13.416
1+465.80 13.440 -3.00% -3.00% 13.413 13.602 13.602 13.413
1+467.20 13.438 -3.00% -3.00% 13.411 13.600 13.600 13.411
1+468.60 13.436 -3.00% -3.00% 13.409 13.598 13.598 13.409

35 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+470.00 13.434 -3.00% -3.00% 13.407 13.596 13.596 13.407


1+471.40 13.432 -3.00% -3.00% 13.405 13.594 13.594 13.405
1+472.80 13.430 -3.00% -3.00% 13.403 13.592 13.592 13.403
1+474.20 13.427 -3.00% -3.00% 13.400 13.589 13.589 13.400
1+475.60 13.425 -3.00% -3.00% 13.398 13.587 13.587 13.398
1+477.00 13.423 -3.00% -3.00% 13.396 13.585 13.585 13.396
1+478.40 13.421 -3.00% -3.00% 13.394 13.583 13.583 13.394
1+479.80 13.419 -3.00% -3.00% 13.392 13.581 13.581 13.392
1+481.20 13.417 -3.00% -3.00% 13.390 13.579 13.579 13.390
1+482.60 13.415 -3.00% -3.00% 13.388 13.577 13.577 13.388
1+484.00 13.413 -3.00% -3.00% 13.386 13.575 13.575 13.386
1+485.40 13.411 -3.00% -3.00% 13.384 13.573 13.573 13.384
1+486.80 13.409 -3.00% -3.00% 13.382 13.571 13.571 13.382
1+488.20 13.407 -3.00% -3.00% 13.380 13.569 13.569 13.380
1+489.60 13.406 -3.00% -3.00% 13.379 13.568 13.568 13.379
1+491.00 13.405 -3.00% -3.00% 13.378 13.567 13.567 13.378
1+492.40 13.403 -3.00% -3.00% 13.376 13.565 13.565 13.376
1+493.80 13.402 -3.00% -3.00% 13.375 13.564 13.564 13.375
1+495.20 13.401 -3.00% -3.00% 13.374 13.563 13.563 13.374
1+496.60 13.400 -3.00% -3.00% 13.373 13.562 13.562 13.373
1+498.00 13.399 -3.00% -3.00% 13.372 13.561 13.561 13.372
1+499.40 13.398 -3.00% -3.00% 13.371 13.560 13.560 13.371
1+500.80 13.397 -3.00% -3.00% 13.370 13.559 13.559 13.370
1+502.20 13.397 -3.00% -3.00% 13.370 13.559 13.559 13.370
1+503.60 13.396 -3.00% -3.00% 13.369 13.558 13.558 13.369
1+505.00 13.396 -3.00% -3.00% 13.369 13.558 13.558 13.369
1+506.40 13.396 -3.00% -3.00% 13.369 13.558 13.558 13.369
1+507.80 13.395 -3.00% -3.00% 13.368 13.557 13.557 13.368
1+509.20 13.395 -3.00% -3.00% 13.368 13.557 13.557 13.368
1+510.60 13.395 -3.00% -3.00% 13.368 13.557 13.557 13.368

36 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+512.00 13.396 -3.00% -3.00% 13.369 13.558 13.558 13.369


1+513.40 13.396 -3.00% -3.00% 13.369 13.558 13.558 13.369
1+514.80 13.396 -3.00% -3.00% 13.369 13.558 13.558 13.369
1+516.20 13.396 -3.00% -3.00% 13.369 13.558 13.558 13.369
1+517.60 13.397 -3.00% -3.00% 13.370 13.559 13.559 13.370
1+519.00 13.398 -3.00% -3.00% 13.371 13.560 13.560 13.371
1+520.40 13.398 -3.00% -3.00% 13.371 13.560 13.560 13.371
1+521.80 13.399 -3.00% -3.00% 13.372 13.561 13.561 13.372
1+523.20 13.400 -3.00% -3.00% 13.373 13.562 13.562 13.373
1+524.60 13.401 -3.00% -3.00% 13.374 13.563 13.563 13.374
1+526.00 13.402 -3.00% -3.00% 13.375 13.564 13.564 13.375
1+527.40 13.404 -3.00% -3.00% 13.377 13.566 13.566 13.377
1+528.80 13.405 -3.00% -3.00% 13.378 13.567 13.567 13.378
1+530.20 13.406 -3.00% -3.00% 13.379 13.568 13.568 13.379
1+531.60 13.408 -3.00% -3.00% 13.381 13.570 13.570 13.381
1+533.00 13.410 -3.00% -3.00% 13.383 13.572 13.572 13.383
1+534.40 13.411 -3.00% -3.00% 13.384 13.573 13.573 13.384
1+535.80 13.413 -3.00% -3.00% 13.386 13.575 13.575 13.386
1+537.20 13.415 -3.00% -3.00% 13.388 13.577 13.577 13.388
1+538.60 13.417 -3.00% -3.00% 13.390 13.579 13.579 13.390
1+540.00 13.419 -3.00% -3.00% 13.392 13.581 13.581 13.392
1+541.40 13.422 -3.00% -3.00% 13.395 13.584 13.584 13.395
1+542.80 13.424 -3.00% -3.00% 13.397 13.586 13.586 13.397
1+544.20 13.426 -3.00% -3.00% 13.399 13.588 13.588 13.399
1+545.60 13.429 -3.00% -3.00% 13.402 13.591 13.591 13.402
1+547.00 13.432 -3.00% -3.00% 13.405 13.594 13.594 13.405
1+548.40 13.434 -3.00% -3.00% 13.407 13.596 13.596 13.407
1+549.80 13.437 -3.00% -3.00% 13.410 13.599 13.599 13.410
1+551.20 13.440 -3.00% -3.00% 13.413 13.602 13.602 13.413
1+552.60 13.443 -3.00% -3.00% 13.416 13.605 13.605 13.416

37 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+554.00 13.447 -3.00% -3.00% 13.420 13.609 13.609 13.420


1+555.40 13.450 -3.00% -3.00% 13.423 13.612 13.612 13.423
1+556.80 13.453 -3.00% -3.00% 13.426 13.615 13.615 13.426
1+558.20 13.457 -3.00% -3.00% 13.430 13.619 13.619 13.430
1+559.60 13.460 -3.00% -3.00% 13.433 13.622 13.622 13.433
1+561.00 13.464 -3.00% -3.00% 13.437 13.626 13.626 13.437
1+562.40 13.468 -3.00% -3.00% 13.441 13.630 13.630 13.441
1+563.80 13.471 -3.00% -3.00% 13.444 13.633 13.633 13.444
1+565.20 13.475 -3.00% -3.00% 13.448 13.637 13.637 13.448
1+566.60 13.479 -3.00% -3.00% 13.452 13.641 13.641 13.452
1+568.00 13.482 -3.00% -3.00% 13.455 13.644 13.644 13.455
1+569.40 13.486 -3.00% -3.00% 13.459 13.648 13.648 13.459
1+570.80 13.490 -3.00% -3.00% 13.463 13.652 13.652 13.463
1+572.20 13.493 -3.00% -3.00% 13.466 13.655 13.655 13.466
1+573.60 13.497 -3.00% -3.00% 13.470 13.659 13.659 13.470
1+575.00 13.501 -3.00% -3.00% 13.474 13.663 13.663 13.474
1+576.40 13.505 -3.00% -3.00% 13.478 13.667 13.667 13.478
1+577.80 13.508 -3.00% -3.00% 13.481 13.670 13.670 13.481
1+579.20 13.512 -3.00% -3.00% 13.485 13.674 13.674 13.485
1+580.60 13.516 -3.00% -3.00% 13.489 13.678 13.678 13.489
1+582.00 13.519 -3.00% -3.00% 13.492 13.681 13.681 13.492
1+583.40 13.523 -3.00% -3.00% 13.496 13.685 13.685 13.496
1+584.80 13.527 -3.00% -3.00% 13.500 13.689 13.689 13.500
1+586.20 13.530 -3.00% -3.00% 13.503 13.692 13.692 13.503
1+587.60 13.534 -3.00% -3.00% 13.507 13.696 13.696 13.507
1+589.00 13.538 -3.00% -3.00% 13.511 13.700 13.700 13.511
1+590.40 13.541 -3.00% -3.00% 13.514 13.703 13.703 13.514
1+591.80 13.545 -3.00% -3.00% 13.518 13.707 13.707 13.518
1+593.20 13.549 -3.00% -3.00% 13.522 13.711 13.711 13.522
1+594.60 13.552 -3.00% -3.00% 13.525 13.714 13.714 13.525

38 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+596.00 13.556 -3.00% -3.00% 13.529 13.718 13.718 13.529


1+597.40 13.560 -3.00% -3.00% 13.533 13.722 13.722 13.533
1+598.80 13.563 -3.00% -3.00% 13.536 13.725 13.725 13.536
1+600.20 13.567 -3.00% -3.00% 13.540 13.729 13.729 13.540
1+601.60 13.571 -3.00% -3.00% 13.544 13.733 13.733 13.544
1+603.00 13.575 -3.00% -3.00% 13.548 13.737 13.737 13.548
1+604.40 13.578 -3.00% -3.00% 13.551 13.740 13.740 13.551
1+605.80 13.582 -3.00% -3.00% 13.555 13.744 13.744 13.555
1+607.20 13.586 -3.00% -3.00% 13.559 13.748 13.748 13.559
1+608.60 13.589 -3.00% -3.00% 13.562 13.751 13.751 13.562
1+610.00 13.593 -3.00% -3.00% 13.566 13.755 13.755 13.566
1+611.40 13.597 -3.00% -3.00% 13.570 13.759 13.759 13.570
1+612.80 13.600 -3.00% -3.00% 13.573 13.762 13.762 13.573
1+614.20 13.604 -3.00% -3.00% 13.577 13.766 13.766 13.577
1+615.60 13.608 -3.00% -3.00% 13.581 13.770 13.770 13.581
1+617.00 13.611 -3.00% -3.00% 13.584 13.773 13.773 13.584
1+618.40 13.615 -3.00% -3.00% 13.588 13.777 13.777 13.588
1+619.80 13.619 -3.00% -3.00% 13.592 13.781 13.781 13.592
1+621.20 13.622 -3.00% -3.00% 13.595 13.784 13.784 13.595
1+622.60 13.626 -3.00% -3.00% 13.599 13.788 13.788 13.599
1+624.00 13.630 -3.00% -3.00% 13.603 13.792 13.792 13.603
1+625.40 13.633 -3.00% -3.00% 13.606 13.795 13.795 13.606
1+626.80 13.637 -3.00% -3.00% 13.610 13.799 13.799 13.610
1+628.20 13.641 -3.00% -3.00% 13.614 13.803 13.803 13.614
1+629.60 13.645 -3.00% -3.00% 13.618 13.807 13.807 13.618
1+631.00 13.648 -3.00% -3.00% 13.621 13.810 13.810 13.621
1+632.40 13.652 -3.00% -3.00% 13.625 13.814 13.814 13.625
1+633.80 13.656 -3.00% -3.00% 13.629 13.818 13.818 13.629
1+635.20 13.659 -3.00% -3.00% 13.632 13.821 13.821 13.632
1+636.60 13.663 -3.00% -3.00% 13.636 13.825 13.825 13.636

39 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+638.00 13.667 -3.00% -3.00% 13.640 13.829 13.829 13.640


1+639.40 13.670 -3.00% -3.00% 13.643 13.832 13.832 13.643
1+640.80 13.674 -3.00% -3.00% 13.647 13.836 13.836 13.647
1+642.20 13.678 -3.00% -3.00% 13.651 13.840 13.840 13.651
1+643.60 13.681 -3.00% -3.00% 13.654 13.843 13.843 13.654
1+645.00 13.685 -3.00% -3.00% 13.658 13.847 13.847 13.658
1+646.40 13.689 -3.00% -3.00% 13.662 13.851 13.851 13.662
1+647.80 13.692 -3.00% -3.00% 13.665 13.854 13.854 13.665
1+649.20 13.696 -3.00% -3.00% 13.669 13.858 13.858 13.669
1+650.60 13.700 -3.00% -3.00% 13.673 13.862 13.862 13.673
1+652.00 13.703 -3.00% -3.00% 13.676 13.865 13.865 13.676
1+653.40 13.707 -3.00% -3.00% 13.680 13.869 13.869 13.680
1+654.80 13.711 -3.00% -3.00% 13.684 13.873 13.873 13.684
1+656.20 13.715 -3.00% -3.00% 13.688 13.877 13.877 13.688
1+657.60 13.718 -3.00% -3.00% 13.691 13.880 13.880 13.691
1+659.00 13.722 -3.00% -3.00% 13.695 13.884 13.884 13.695
1+660.40 13.726 -3.00% -3.00% 13.699 13.888 13.888 13.699
1+661.80 13.729 -3.00% -3.00% 13.702 13.891 13.891 13.702
1+663.20 13.733 -3.00% -3.00% 13.706 13.895 13.895 13.706
1+664.60 13.737 -3.00% -3.00% 13.710 13.899 13.899 13.710
1+666.00 13.740 -3.00% -3.00% 13.713 13.902 13.902 13.713
1+667.40 13.744 -3.00% -3.00% 13.717 13.906 13.906 13.717
1+668.80 13.748 -3.00% -3.00% 13.721 13.910 13.910 13.721
1+670.20 13.751 -3.00% -3.00% 13.724 13.913 13.913 13.724
1+671.60 13.755 -3.00% -3.00% 13.728 13.917 13.917 13.728
1+673.00 13.759 -3.00% -3.00% 13.732 13.921 13.921 13.732
1+674.40 13.762 -3.00% -3.00% 13.735 13.924 13.924 13.735
1+675.80 13.766 -3.00% -3.00% 13.739 13.928 13.928 13.739
1+677.20 13.770 -3.00% -3.00% 13.743 13.932 13.932 13.743
1+678.60 13.773 -3.00% -3.00% 13.746 13.935 13.935 13.746

40 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+680.00 13.777 -3.00% -3.00% 13.750 13.939 13.939 13.750


1+681.40 13.781 -3.00% -3.00% 13.754 13.943 13.943 13.754
1+682.80 13.784 -3.00% -3.00% 13.757 13.946 13.946 13.757
1+684.20 13.788 -3.00% -3.00% 13.761 13.950 13.950 13.761
1+685.60 13.792 -3.00% -3.00% 13.765 13.954 13.954 13.765
1+687.00 13.796 -3.00% -3.00% 13.769 13.958 13.958 13.769
1+688.40 13.799 -3.00% -3.00% 13.772 13.961 13.961 13.772
1+689.80 13.803 -3.00% -3.00% 13.776 13.965 13.965 13.776
1+691.20 13.807 -3.00% -3.00% 13.780 13.969 13.969 13.780
1+692.60 13.810 -3.00% -3.00% 13.783 13.972 13.972 13.783
1+694.00 13.814 -3.00% -3.00% 13.787 13.976 13.976 13.787
1+695.40 13.818 -3.00% -3.00% 13.791 13.980 13.980 13.791
1+696.80 13.821 -3.00% -3.00% 13.794 13.983 13.983 13.794
1+698.20 13.825 -3.00% -3.00% 13.798 13.987 13.987 13.798
1+699.60 13.829 -3.00% -3.00% 13.802 13.991 13.991 13.802
1+701.00 13.832 -3.00% -3.00% 13.805 13.994 13.994 13.805
1+702.40 13.836 -3.00% -3.00% 13.809 13.998 13.998 13.809
1+703.80 13.840 -3.00% -3.00% 13.813 14.002 14.002 13.813
1+705.20 13.843 -3.00% -3.00% 13.816 14.005 14.005 13.816
1+706.60 13.847 -3.00% -3.00% 13.820 14.009 14.009 13.820
1+708.00 13.851 -3.00% -3.00% 13.824 14.013 14.013 13.824
1+709.40 13.854 -3.00% -3.00% 13.827 14.016 14.016 13.827
1+710.80 13.858 -3.00% -3.00% 13.831 14.020 14.020 13.831
1+712.20 13.862 -3.00% -3.00% 13.835 14.024 14.024 13.835
1+713.60 13.866 -3.00% -3.00% 13.839 14.028 14.028 13.839
1+715.00 13.869 -3.00% -3.00% 13.842 14.031 14.031 13.842
1+716.40 13.873 -3.00% -3.00% 13.846 14.035 14.035 13.846
1+717.80 13.877 -3.00% -3.00% 13.850 14.039 14.039 13.850
1+719.20 13.880 -3.00% -3.00% 13.853 14.042 14.042 13.853
1+720.60 13.884 -3.00% -3.00% 13.857 14.046 14.046 13.857

41 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+722.00 13.888 -3.00% -3.00% 13.861 14.050 14.050 13.861


1+723.40 13.891 -3.00% -3.00% 13.864 14.053 14.053 13.864
1+724.80 13.895 -3.00% -3.00% 13.868 14.057 14.057 13.868
1+726.20 13.899 -3.00% -3.00% 13.872 14.061 14.061 13.872
1+727.60 13.902 -3.00% -3.00% 13.875 14.064 14.064 13.875
1+729.00 13.906 -3.00% -3.00% 13.879 14.068 14.068 13.879
1+730.40 13.910 -3.00% -3.00% 13.883 14.072 14.072 13.883
1+731.80 13.913 -3.00% -3.00% 13.886 14.075 14.075 13.886
1+733.20 13.917 -3.00% -3.00% 13.890 14.079 14.079 13.890
1+734.60 13.921 -3.00% -3.00% 13.894 14.083 14.083 13.894
1+736.00 13.924 -3.00% -3.00% 13.897 14.086 14.086 13.897
1+737.40 13.928 -3.00% -3.00% 13.901 14.090 14.090 13.901
1+738.80 13.932 -3.00% -3.00% 13.905 14.094 14.094 13.905
1+740.20 13.936 -3.00% -3.00% 13.909 14.098 14.098 13.909
1+741.60 13.939 -3.00% -3.00% 13.912 14.101 14.101 13.912
1+743.00 13.943 -3.00% -3.00% 13.916 14.105 14.105 13.916
1+744.40 13.947 -3.00% -3.00% 13.920 14.109 14.109 13.920
1+745.80 13.950 -3.00% -3.00% 13.923 14.112 14.112 13.923
1+747.20 13.954 -3.00% -3.00% 13.927 14.116 14.116 13.927
1+748.60 13.958 -3.00% -3.00% 13.931 14.120 14.120 13.931
1+750.00 13.961 -3.00% -3.00% 13.934 14.123 14.123 13.934
1+751.40 13.965 -3.00% -3.00% 13.938 14.127 14.127 13.938
1+752.80 13.969 -3.00% -3.00% 13.942 14.131 14.131 13.942
1+754.20 13.972 -3.00% -3.00% 13.945 14.134 14.134 13.945
1+755.60 13.976 -3.00% -3.00% 13.949 14.138 14.138 13.949
1+757.00 13.980 -3.00% -3.00% 13.953 14.142 14.142 13.953
1+758.40 13.983 -3.00% -3.00% 13.956 14.145 14.145 13.956
1+759.80 13.987 -3.00% -3.00% 13.960 14.149 14.149 13.960
1+761.20 13.991 -3.00% -3.00% 13.964 14.153 14.153 13.964
1+762.60 13.994 -3.00% -3.00% 13.967 14.156 14.156 13.967

42 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+764.00 13.998 -3.00% -3.00% 13.971 14.160 14.160 13.971


1+765.40 14.002 -3.00% -3.00% 13.975 14.164 14.164 13.975
1+766.80 14.005 -3.00% -3.00% 13.978 14.167 14.167 13.978
1+768.20 14.009 -3.00% -3.00% 13.982 14.171 14.171 13.982
1+769.60 14.012 -3.00% -3.00% 13.985 14.174 14.174 13.985
1+771.00 14.016 -3.00% -3.00% 13.989 14.178 14.178 13.989
1+772.40 14.019 -3.00% -3.00% 13.992 14.181 14.181 13.992
1+773.80 14.023 -3.00% -3.00% 13.996 14.185 14.185 13.996
1+775.20 14.026 -3.00% -3.00% 13.999 14.188 14.188 13.999
1+776.60 14.030 -3.00% -3.00% 14.003 14.192 14.192 14.003
1+778.00 14.033 -3.00% -3.00% 14.006 14.195 14.195 14.006
1+779.40 14.036 -3.00% -3.00% 14.009 14.198 14.198 14.009
1+780.80 14.040 -3.00% -3.00% 14.013 14.202 14.202 14.013
1+782.20 14.043 -3.00% -3.00% 14.016 14.205 14.205 14.016
1+783.60 14.046 -3.00% -3.00% 14.019 14.208 14.208 14.019
1+785.00 14.049 -3.00% -3.00% 14.022 14.211 14.211 14.022
1+786.40 14.053 -3.00% -3.00% 14.026 14.215 14.215 14.026
1+787.80 14.056 -3.00% -3.00% 14.029 14.218 14.218 14.029
1+789.20 14.059 -3.00% -3.00% 14.032 14.221 14.221 14.032
1+790.60 14.062 -3.00% -3.00% 14.035 14.224 14.224 14.035
1+792.00 14.065 -3.00% -3.00% 14.038 14.227 14.227 14.038
1+793.40 14.069 -3.00% -3.00% 14.042 14.231 14.231 14.042
1+794.80 14.072 -3.00% -3.00% 14.045 14.234 14.234 14.045
1+796.20 14.075 -3.00% -3.00% 14.048 14.237 14.237 14.048
1+797.60 14.078 -3.00% -3.00% 14.051 14.240 14.240 14.051
1+799.00 14.081 -3.00% -3.00% 14.054 14.243 14.243 14.054
1+800.40 14.084 -3.00% -3.00% 14.057 14.246 14.246 14.057
1+801.80 14.087 -3.00% -3.00% 14.060 14.249 14.249 14.060
1+803.20 14.090 -3.00% -3.00% 14.063 14.252 14.252 14.063
1+804.60 14.093 -3.00% -3.00% 14.066 14.255 14.255 14.066

43 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+806.00 14.095 -3.00% -3.00% 14.068 14.257 14.257 14.068


1+807.40 14.098 -3.00% -3.00% 14.071 14.260 14.260 14.071
1+808.80 14.101 -3.00% -3.00% 14.074 14.263 14.263 14.074
1+810.20 14.104 -3.00% -3.00% 14.077 14.266 14.266 14.077
1+811.60 14.107 -3.00% -3.00% 14.080 14.269 14.269 14.080
1+813.00 14.110 -3.00% -3.00% 14.083 14.272 14.272 14.083
1+814.40 14.112 -3.00% -3.00% 14.085 14.274 14.274 14.085
1+815.80 14.115 -3.00% -3.00% 14.088 14.277 14.277 14.088
1+817.20 14.118 -3.00% -3.00% 14.091 14.280 14.280 14.091
1+818.60 14.120 -3.00% -3.00% 14.093 14.282 14.282 14.093
1+820.00 14.123 -3.00% -3.00% 14.096 14.285 14.285 14.096
1+821.40 14.126 -3.00% -3.00% 14.099 14.288 14.288 14.099
1+822.80 14.128 -3.00% -3.00% 14.101 14.290 14.290 14.101
1+824.20 14.131 -3.00% -3.00% 14.104 14.293 14.293 14.104
1+825.60 14.133 -3.00% -3.00% 14.106 14.295 14.295 14.106
1+827.00 14.136 -3.00% -3.00% 14.109 14.298 14.298 14.109
1+828.40 14.138 -3.00% -3.00% 14.111 14.300 14.300 14.111
1+829.80 14.141 -3.00% -3.00% 14.114 14.303 14.303 14.114
1+831.20 14.143 -3.00% -3.00% 14.116 14.305 14.305 14.116
1+832.60 14.146 -3.00% -3.00% 14.119 14.308 14.308 14.119
1+834.00 14.148 -3.00% -3.00% 14.121 14.310 14.310 14.121
1+835.40 14.151 -3.00% -3.00% 14.124 14.313 14.313 14.124
1+836.80 14.153 -3.00% -3.00% 14.126 14.315 14.315 14.126
1+838.20 14.155 -3.00% -3.00% 14.128 14.317 14.317 14.128
1+839.60 14.158 -3.00% -3.00% 14.131 14.320 14.320 14.131
1+841.00 14.160 -3.00% -3.00% 14.133 14.322 14.322 14.133
1+842.40 14.162 -3.00% -3.00% 14.135 14.324 14.324 14.135
1+843.80 14.165 -3.00% -3.00% 14.138 14.327 14.327 14.138
1+845.20 14.167 -3.00% -3.00% 14.140 14.329 14.329 14.140
1+846.60 14.169 -2.83% -3.00% 14.150 14.329 14.331 14.142

44 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+848.00 14.171 -2.64% -3.00% 14.162 14.328 14.333 14.144


1+849.40 14.174 -2.45% -3.00% 14.174 14.328 14.336 14.147
1+850.80 14.176 -2.27% -3.00% 14.185 14.328 14.338 14.149
1+852.20 14.178 -2.08% -3.00% 14.196 14.327 14.340 14.151
1+853.60 14.181 -1.89% -3.00% 14.208 14.328 14.343 14.154
1+855.00 14.183 -1.71% -3.00% 14.219 14.327 14.345 14.156
1+856.40 14.185 -1.52% -3.00% 14.230 14.326 14.347 14.158
1+857.80 14.187 -1.33% -3.00% 14.242 14.326 14.349 14.160
1+859.20 14.190 -1.15% -3.00% 14.254 14.326 14.352 14.163
1+860.60 14.192 -0.96% -3.00% 14.265 14.325 14.354 14.165
1+862.00 14.194 -0.77% -3.00% 14.276 14.325 14.356 14.167
1+863.40 14.197 -0.59% -3.00% 14.288 14.325 14.359 14.170
1+864.80 14.199 -0.40% -3.00% 14.299 14.325 14.361 14.172
1+866.20 14.201 -0.21% -3.00% 14.310 14.324 14.363 14.174
1+867.60 14.203 -0.03% -3.00% 14.322 14.323 14.365 14.176
1+869.00 14.206 0.16% -3.00% 14.334 14.324 14.368 14.179
1+870.40 14.208 0.35% -3.00% 14.345 14.323 14.370 14.181
1+871.80 14.210 0.53% -3.00% 14.356 14.323 14.372 14.183
1+873.20 14.213 0.72% -3.00% 14.368 14.323 14.375 14.186
1+874.60 14.215 0.91% -3.00% 14.379 14.322 14.377 14.188
1+876.00 14.217 1.09% -3.00% 14.391 14.322 14.379 14.190
1+877.40 14.219 1.28% -3.00% 14.402 14.321 14.381 14.192
1+878.80 14.222 1.47% -3.00% 14.414 14.321 14.384 14.195
1+880.20 14.224 1.65% -3.00% 14.425 14.321 14.386 14.197
1+881.60 14.226 1.84% -3.00% 14.436 14.320 14.388 14.199
1+883.00 14.229 2.03% -3.00% 14.448 14.321 14.391 14.202
1+884.40 14.231 2.21% -3.00% 14.459 14.320 14.393 14.204
1+885.80 14.233 2.40% -3.00% 14.471 14.319 14.395 14.206
1+887.20 14.236 2.59% -3.00% 14.483 14.320 14.398 14.209
1+888.60 14.238 2.77% -3.00% 14.494 14.319 14.400 14.211

45 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+890.00 14.240 2.96% -3.00% 14.505 14.319 14.402 14.213


1+891.40 14.242 3.15% -3.15% 14.516 14.318 14.406 14.208
1+892.80 14.245 3.33% -3.33% 14.528 14.318 14.412 14.202
1+894.20 14.247 3.52% -3.52% 14.539 14.318 14.416 14.195
1+895.60 14.249 3.71% -3.71% 14.551 14.317 14.421 14.187
1+897.00 14.252 3.89% -3.89% 14.563 14.318 14.426 14.181
1+898.40 14.254 4.08% -4.08% 14.574 14.317 14.431 14.174
1+899.80 14.256 4.27% -4.27% 14.585 14.316 14.436 14.167
1+901.20 14.258 4.45% -4.45% 14.596 14.316 14.440 14.160
1+902.60 14.261 4.64% -4.64% 14.608 14.316 14.446 14.154
1+904.00 14.263 4.83% -4.83% 14.619 14.315 14.451 14.147
1+905.40 14.265 5.01% -5.01% 14.631 14.315 14.455 14.139
1+906.80 14.268 5.20% -5.20% 14.643 14.315 14.461 14.133
1+908.20 14.270 5.20% -5.20% 14.645 14.317 14.463 14.135
1+909.60 14.272 5.20% -5.20% 14.647 14.319 14.465 14.137
1+911.00 14.274 5.20% -5.20% 14.649 14.321 14.467 14.139
1+912.40 14.277 5.20% -5.20% 14.652 14.324 14.470 14.142
1+913.80 14.279 5.20% -5.20% 14.654 14.326 14.472 14.144
1+915.20 14.281 5.20% -5.20% 14.656 14.328 14.474 14.146
1+916.60 14.284 5.20% -5.20% 14.659 14.331 14.477 14.149
1+918.00 14.286 5.20% -5.20% 14.661 14.333 14.479 14.151
1+919.40 14.288 5.20% -5.20% 14.663 14.335 14.481 14.153
1+920.80 14.291 5.20% -5.20% 14.666 14.338 14.484 14.156
1+922.20 14.293 5.20% -5.20% 14.668 14.340 14.486 14.158
1+923.60 14.295 5.20% -5.20% 14.670 14.342 14.488 14.160
1+925.00 14.297 5.20% -5.20% 14.672 14.344 14.490 14.162
1+926.40 14.300 5.20% -5.20% 14.675 14.347 14.493 14.165
1+927.80 14.302 5.20% -5.20% 14.677 14.349 14.495 14.167
1+929.20 14.304 5.20% -5.20% 14.679 14.351 14.497 14.169
1+930.60 14.307 5.20% -5.20% 14.682 14.354 14.500 14.172

46 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+932.00 14.309 5.20% -5.20% 14.684 14.356 14.502 14.174


1+933.40 14.311 5.20% -5.20% 14.686 14.358 14.504 14.176
1+934.80 14.313 5.20% -5.20% 14.688 14.360 14.506 14.178
1+936.20 14.316 5.20% -5.20% 14.691 14.363 14.509 14.181
1+937.60 14.318 5.20% -5.20% 14.693 14.365 14.511 14.183
1+939.00 14.320 5.20% -5.20% 14.695 14.367 14.513 14.185
1+940.40 14.323 5.20% -5.20% 14.698 14.370 14.516 14.188
1+941.80 14.325 5.20% -5.20% 14.700 14.372 14.518 14.190
1+943.20 14.327 5.20% -5.20% 14.702 14.374 14.520 14.192
1+944.60 14.329 5.20% -5.20% 14.704 14.376 14.522 14.194
1+946.00 14.332 5.20% -5.20% 14.707 14.379 14.525 14.197
1+947.40 14.334 5.20% -5.20% 14.709 14.381 14.527 14.199
1+948.80 14.336 5.20% -5.20% 14.711 14.383 14.529 14.201
1+950.20 14.339 5.20% -5.20% 14.714 14.386 14.532 14.204
1+951.60 14.341 5.20% -5.20% 14.716 14.388 14.534 14.206
1+953.00 14.343 5.20% -5.20% 14.718 14.390 14.536 14.208
1+954.40 14.345 5.20% -5.20% 14.720 14.392 14.538 14.210
1+955.80 14.348 5.20% -5.20% 14.723 14.395 14.541 14.213
1+957.20 14.350 5.20% -5.20% 14.725 14.397 14.543 14.215
1+958.60 14.352 5.20% -5.20% 14.727 14.399 14.545 14.217
1+960.00 14.355 5.20% -5.20% 14.730 14.402 14.548 14.220
1+961.40 14.357 5.20% -5.20% 14.732 14.404 14.550 14.222
1+962.80 14.359 5.20% -5.20% 14.734 14.406 14.552 14.224
1+964.20 14.362 5.20% -5.20% 14.737 14.409 14.555 14.227
1+965.60 14.364 5.20% -5.20% 14.739 14.411 14.557 14.229
1+967.00 14.366 5.20% -5.20% 14.741 14.413 14.559 14.231
1+968.40 14.368 5.20% -5.20% 14.743 14.415 14.561 14.233
1+969.80 14.371 5.20% -5.20% 14.746 14.418 14.564 14.236
1+971.20 14.373 5.20% -5.20% 14.748 14.420 14.566 14.238
1+972.60 14.375 5.20% -5.20% 14.750 14.422 14.568 14.240

47 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

1+974.00 14.378 5.20% -5.20% 14.753 14.425 14.571 14.243


1+975.40 14.380 5.20% -5.20% 14.755 14.427 14.573 14.245
1+976.80 14.382 5.20% -5.20% 14.757 14.429 14.575 14.247
1+978.20 14.384 5.20% -5.20% 14.759 14.431 14.577 14.249
1+979.60 14.387 5.20% -5.20% 14.762 14.434 14.580 14.252
1+981.00 14.389 5.20% -5.20% 14.764 14.436 14.582 14.254
1+982.40 14.391 5.20% -5.20% 14.766 14.438 14.584 14.256
1+983.80 14.394 5.20% -5.20% 14.769 14.441 14.587 14.259
1+985.20 14.396 5.20% -5.20% 14.771 14.443 14.589 14.261
1+986.60 14.398 5.20% -5.20% 14.773 14.445 14.591 14.263
1+988.00 14.400 5.20% -5.20% 14.775 14.447 14.593 14.265
1+989.40 14.403 5.20% -5.20% 14.778 14.450 14.596 14.268
1+990.80 14.405 5.20% -5.20% 14.780 14.452 14.598 14.270
1+992.20 14.407 5.20% -5.20% 14.782 14.454 14.600 14.272
1+993.60 14.410 5.20% -5.20% 14.785 14.457 14.603 14.275
1+995.00 14.412 5.20% -5.20% 14.787 14.459 14.605 14.277
1+996.40 14.414 5.20% -5.20% 14.789 14.461 14.607 14.279
1+997.80 14.416 5.20% -5.20% 14.791 14.463 14.609 14.281
1+999.20 14.419 5.20% -5.20% 14.794 14.466 14.612 14.284
2+000.60 14.421 5.20% -5.20% 14.796 14.468 14.614 14.286
2+002.00 14.423 5.20% -5.20% 14.798 14.470 14.616 14.288
2+003.40 14.426 5.20% -5.20% 14.801 14.473 14.619 14.291
2+004.80 14.428 5.20% -5.20% 14.803 14.475 14.621 14.293
2+006.20 14.430 5.20% -5.20% 14.805 14.477 14.623 14.295
2+007.60 14.433 5.20% -5.20% 14.808 14.480 14.626 14.298
2+009.00 14.435 5.20% -5.20% 14.810 14.482 14.628 14.300
2+010.40 14.437 5.20% -5.20% 14.812 14.484 14.630 14.302
2+011.80 14.439 5.20% -5.20% 14.814 14.486 14.632 14.304
2+013.20 14.442 5.20% -5.20% 14.817 14.489 14.635 14.307
2+014.60 14.444 5.20% -5.20% 14.819 14.491 14.637 14.309

48 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+016.00 14.446 5.20% -5.20% 14.821 14.493 14.639 14.311


2+017.40 14.449 5.20% -5.20% 14.824 14.496 14.642 14.314
2+018.80 14.451 5.20% -5.20% 14.826 14.498 14.644 14.316
2+020.20 14.453 5.20% -5.20% 14.828 14.500 14.646 14.318
2+021.60 14.455 5.20% -5.20% 14.830 14.502 14.648 14.320
2+023.00 14.458 5.20% -5.20% 14.833 14.505 14.651 14.323
2+024.40 14.460 5.20% -5.20% 14.835 14.507 14.653 14.325
2+025.80 14.462 5.20% -5.20% 14.837 14.509 14.655 14.327
2+027.20 14.465 5.20% -5.20% 14.840 14.512 14.658 14.330
2+028.60 14.467 5.20% -5.20% 14.842 14.514 14.660 14.332
2+030.00 14.469 5.20% -5.20% 14.844 14.516 14.662 14.334
2+031.40 14.471 5.20% -5.20% 14.846 14.518 14.664 14.336
2+032.80 14.474 5.20% -5.20% 14.849 14.521 14.667 14.339
2+034.20 14.476 5.20% -5.20% 14.851 14.523 14.669 14.341
2+035.60 14.478 5.20% -5.20% 14.853 14.525 14.671 14.343
2+037.00 14.481 5.20% -5.20% 14.856 14.528 14.674 14.346
2+038.40 14.483 5.20% -5.20% 14.858 14.530 14.676 14.348
2+039.80 14.485 5.20% -5.20% 14.860 14.532 14.678 14.350
2+041.20 14.488 5.20% -5.20% 14.863 14.535 14.681 14.353
2+042.60 14.490 5.20% -5.20% 14.865 14.537 14.683 14.355
2+044.00 14.492 5.20% -5.20% 14.867 14.539 14.685 14.357
2+045.40 14.494 5.20% -5.20% 14.869 14.541 14.687 14.359
2+046.80 14.497 5.20% -5.20% 14.872 14.544 14.690 14.362
2+048.20 14.499 5.20% -5.20% 14.874 14.546 14.692 14.364
2+049.60 14.501 5.20% -5.20% 14.876 14.548 14.694 14.366
2+051.00 14.504 5.20% -5.20% 14.879 14.551 14.697 14.369
2+052.40 14.506 5.20% -5.20% 14.881 14.553 14.699 14.371
2+053.80 14.508 5.20% -5.20% 14.883 14.555 14.701 14.373
2+055.20 14.510 5.20% -5.20% 14.885 14.557 14.703 14.375
2+056.60 14.513 5.20% -5.20% 14.888 14.560 14.706 14.378

49 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+058.00 14.515 5.20% -5.20% 14.890 14.562 14.708 14.380


2+059.40 14.517 5.20% -5.20% 14.892 14.564 14.710 14.382
2+060.80 14.520 5.20% -5.20% 14.895 14.567 14.713 14.385
2+062.20 14.522 5.20% -5.20% 14.897 14.569 14.715 14.387
2+063.60 14.524 5.20% -5.20% 14.899 14.571 14.717 14.389
2+065.00 14.526 5.20% -5.20% 14.901 14.573 14.719 14.391
2+066.40 14.529 5.20% -5.20% 14.904 14.576 14.722 14.394
2+067.80 14.531 5.20% -5.20% 14.906 14.578 14.724 14.396
2+069.20 14.533 5.20% -5.20% 14.908 14.580 14.726 14.398
2+070.60 14.536 5.20% -5.20% 14.911 14.583 14.729 14.401
2+072.00 14.538 5.20% -5.20% 14.913 14.585 14.731 14.403
2+073.40 14.540 5.20% -5.20% 14.915 14.587 14.733 14.405
2+074.80 14.542 5.20% -5.20% 14.917 14.589 14.735 14.407
2+076.20 14.545 5.20% -5.20% 14.920 14.592 14.738 14.410
2+077.60 14.547 5.20% -5.20% 14.922 14.594 14.740 14.412
2+079.00 14.549 5.20% -5.20% 14.924 14.596 14.742 14.414
2+080.40 14.552 5.20% -5.20% 14.927 14.599 14.745 14.417
2+081.80 14.554 5.20% -5.20% 14.929 14.601 14.747 14.419
2+083.20 14.556 5.20% -5.20% 14.931 14.603 14.749 14.421
2+084.60 14.559 5.20% -5.20% 14.934 14.606 14.752 14.424
2+086.00 14.561 5.20% -5.20% 14.936 14.608 14.754 14.426
2+087.40 14.563 5.20% -5.20% 14.938 14.610 14.756 14.428
2+088.80 14.565 5.20% -5.20% 14.940 14.612 14.758 14.430
2+090.20 14.568 5.20% -5.20% 14.943 14.615 14.761 14.433
2+091.60 14.570 5.20% -5.20% 14.945 14.617 14.763 14.435
2+093.00 14.573 5.20% -5.20% 14.948 14.620 14.766 14.438
2+094.40 14.575 5.20% -5.20% 14.950 14.622 14.768 14.440
2+095.80 14.578 5.20% -5.20% 14.953 14.625 14.771 14.443
2+097.20 14.581 5.20% -5.20% 14.956 14.628 14.774 14.446
2+098.60 14.583 5.20% -5.20% 14.958 14.630 14.776 14.448

50 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+100.00 14.586 5.20% -5.20% 14.961 14.633 14.779 14.451


2+101.40 14.588 5.20% -5.20% 14.963 14.635 14.781 14.453
2+102.80 14.591 5.20% -5.20% 14.966 14.638 14.784 14.456
2+104.20 14.593 5.20% -5.20% 14.968 14.640 14.786 14.458
2+105.60 14.596 5.20% -5.20% 14.971 14.643 14.789 14.461
2+107.00 14.599 5.20% -5.20% 14.974 14.646 14.792 14.464
2+108.40 14.601 5.20% -5.20% 14.976 14.648 14.794 14.466
2+109.80 14.604 5.20% -5.20% 14.979 14.651 14.797 14.469
2+111.20 14.606 5.20% -5.20% 14.981 14.653 14.799 14.471
2+112.60 14.609 5.20% -5.20% 14.984 14.656 14.802 14.474
2+114.00 14.611 5.20% -5.20% 14.986 14.658 14.804 14.476
2+115.40 14.614 5.20% -5.20% 14.989 14.661 14.807 14.479
2+116.80 14.617 5.20% -5.20% 14.992 14.664 14.810 14.482
2+118.20 14.619 5.20% -5.20% 14.994 14.666 14.812 14.484
2+119.60 14.622 5.20% -5.20% 14.997 14.669 14.815 14.487
2+121.00 14.624 5.20% -5.20% 14.999 14.671 14.817 14.489
2+122.40 14.627 5.20% -5.20% 15.002 14.674 14.820 14.492
2+123.80 14.629 5.20% -5.20% 15.004 14.676 14.822 14.494
2+125.20 14.632 5.20% -5.20% 15.007 14.679 14.825 14.497
2+126.60 14.635 5.20% -5.20% 15.010 14.682 14.828 14.500
2+128.00 14.637 5.20% -5.20% 15.012 14.684 14.830 14.502
2+129.40 14.640 5.20% -5.20% 15.015 14.687 14.833 14.505
2+130.80 14.642 5.20% -5.20% 15.017 14.689 14.835 14.507
2+132.20 14.645 5.20% -5.20% 15.020 14.692 14.838 14.510
2+133.60 14.648 5.20% -5.20% 15.023 14.695 14.841 14.513
2+135.00 14.650 5.20% -5.20% 15.025 14.697 14.843 14.515
2+136.40 14.653 5.20% -5.20% 15.028 14.700 14.846 14.518
2+137.80 14.655 5.20% -5.20% 15.030 14.702 14.848 14.520
2+139.20 14.658 5.20% -5.20% 15.033 14.705 14.851 14.523
2+140.60 14.660 5.20% -5.20% 15.035 14.707 14.853 14.525

51 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+142.00 14.663 5.20% -5.20% 15.038 14.710 14.856 14.528


2+143.40 14.666 5.20% -5.20% 15.041 14.713 14.859 14.531
2+144.80 14.668 5.20% -5.20% 15.043 14.715 14.861 14.533
2+146.20 14.671 5.14% -5.14% 15.043 14.719 14.863 14.539
2+147.60 14.673 4.95% -4.95% 15.036 14.724 14.862 14.550
2+149.00 14.676 4.76% -4.76% 15.029 14.729 14.863 14.563
2+150.40 14.678 4.58% -4.58% 15.022 14.734 14.862 14.574
2+151.80 14.681 4.39% -4.39% 15.016 14.740 14.862 14.586
2+153.20 14.684 4.20% -4.20% 15.010 14.745 14.863 14.598
2+154.60 14.686 4.02% -4.02% 15.003 14.750 14.862 14.609
2+156.00 14.689 3.83% -3.83% 14.997 14.755 14.863 14.621
2+157.40 14.691 3.64% -3.64% 14.989 14.760 14.862 14.633
2+158.80 14.694 3.46% -3.46% 14.983 14.766 14.862 14.645
2+160.20 14.696 3.27% -3.27% 14.976 14.770 14.862 14.656
2+161.60 14.699 3.08% -3.08% 14.970 14.776 14.862 14.668
2+163.00 14.702 2.90% -3.00% 14.964 14.781 14.864 14.675
2+164.40 14.704 2.71% -3.00% 14.957 14.786 14.866 14.677
2+165.80 14.707 2.52% -3.00% 14.951 14.792 14.869 14.680
2+167.20 14.709 2.34% -3.00% 14.943 14.796 14.871 14.682
2+168.60 14.712 2.15% -3.00% 14.937 14.802 14.874 14.685
2+170.00 14.714 1.96% -3.00% 14.930 14.807 14.876 14.687
2+171.40 14.717 1.78% -3.00% 14.924 14.812 14.879 14.690
2+172.80 14.720 1.59% -3.00% 14.918 14.818 14.882 14.693
2+174.20 14.722 1.40% -3.00% 14.911 14.822 14.884 14.695
2+175.60 14.725 1.22% -3.00% 14.905 14.828 14.887 14.698
2+177.00 14.727 1.03% -3.00% 14.897 14.833 14.889 14.700
2+178.40 14.730 0.84% -3.00% 14.891 14.838 14.892 14.703
2+179.80 14.733 0.66% -3.00% 14.885 14.844 14.895 14.706
2+181.20 14.735 0.47% -3.00% 14.878 14.848 14.897 14.708
2+182.60 14.738 0.28% -3.00% 14.872 14.854 14.900 14.711

52 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+184.00 14.740 0.10% -3.00% 14.865 14.859 14.902 14.713


2+185.40 14.743 -0.09% -3.00% 14.859 14.864 14.905 14.716
2+186.80 14.745 -0.28% -3.00% 14.851 14.869 14.907 14.718
2+188.20 14.748 -0.46% -3.00% 14.845 14.874 14.910 14.721
2+189.60 14.751 -0.65% -3.00% 14.839 14.880 14.913 14.724
2+191.00 14.753 -0.84% -3.00% 14.832 14.885 14.915 14.726
2+192.40 14.756 -1.02% -3.00% 14.826 14.890 14.918 14.729
2+193.80 14.758 -1.21% -3.00% 14.819 14.895 14.920 14.731
2+195.20 14.761 -1.40% -3.00% 14.813 14.901 14.923 14.734
2+196.60 14.763 -1.58% -3.00% 14.805 14.905 14.925 14.736
2+198.00 14.766 -1.77% -3.00% 14.799 14.911 14.928 14.739
2+199.40 14.769 -1.96% -3.00% 14.793 14.916 14.931 14.742
2+200.80 14.771 -2.14% -3.00% 14.786 14.921 14.933 14.744
2+202.20 14.774 -2.33% -3.00% 14.780 14.927 14.936 14.747
2+203.60 14.776 -2.52% -3.00% 14.773 14.931 14.938 14.749
2+205.00 14.779 -2.70% -3.00% 14.767 14.937 14.941 14.752
2+206.40 14.781 -2.89% -3.00% 14.759 14.941 14.943 14.754
2+207.80 14.784 -3.00% -3.00% 14.757 14.946 14.946 14.757
2+209.20 14.787 -3.00% -3.00% 14.760 14.949 14.949 14.760
2+210.60 14.789 -3.00% -3.00% 14.762 14.951 14.951 14.762
2+212.00 14.792 -3.00% -3.00% 14.765 14.954 14.954 14.765
2+213.40 14.794 -3.00% -3.00% 14.767 14.956 14.956 14.767
2+214.80 14.797 -3.00% -3.00% 14.770 14.959 14.959 14.770
2+216.20 14.799 -3.00% -3.00% 14.772 14.961 14.961 14.772
2+217.60 14.802 -3.00% -3.00% 14.775 14.964 14.964 14.775
2+219.00 14.805 -3.00% -3.00% 14.778 14.967 14.967 14.778
2+220.40 14.807 -3.00% -3.00% 14.780 14.969 14.969 14.780
2+221.80 14.810 -3.00% -3.00% 14.783 14.972 14.972 14.783
2+223.20 14.812 -3.00% -3.00% 14.785 14.974 14.974 14.785
2+224.60 14.815 -3.00% -3.00% 14.788 14.977 14.977 14.788

53 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+226.00 14.818 -3.00% -3.00% 14.791 14.980 14.980 14.791


2+227.40 14.820 -3.00% -3.00% 14.793 14.982 14.982 14.793
2+228.80 14.823 -3.00% -3.00% 14.796 14.985 14.985 14.796
2+230.20 14.825 -3.00% -3.00% 14.798 14.987 14.987 14.798
2+231.60 14.828 -3.00% -3.00% 14.801 14.990 14.990 14.801
2+233.00 14.830 -3.00% -3.00% 14.803 14.992 14.992 14.803
2+234.40 14.833 -3.00% -3.00% 14.806 14.995 14.995 14.806
2+235.80 14.836 -3.00% -3.00% 14.809 14.998 14.998 14.809
2+237.20 14.838 -3.00% -3.00% 14.811 15.000 15.000 14.811
2+238.60 14.841 -3.00% -3.00% 14.814 15.003 15.003 14.814
2+240.00 14.843 -3.00% -3.00% 14.816 15.005 15.005 14.816
2+241.40 14.846 -3.00% -3.00% 14.819 15.008 15.008 14.819
2+242.80 14.848 -3.00% -3.00% 14.821 15.010 15.010 14.821
2+244.20 14.851 -3.00% -3.00% 14.824 15.013 15.013 14.824
2+245.60 14.854 -3.00% -3.00% 14.827 15.016 15.016 14.827
2+247.00 14.856 -3.00% -3.00% 14.829 15.018 15.018 14.829
2+248.40 14.859 -3.00% -3.00% 14.832 15.021 15.021 14.832
2+249.80 14.861 -3.00% -3.00% 14.834 15.023 15.023 14.834
2+251.20 14.864 -3.00% -3.00% 14.837 15.026 15.026 14.837
2+252.60 14.866 -3.00% -3.00% 14.839 15.028 15.028 14.839
2+254.00 14.869 -3.00% -3.00% 14.842 15.031 15.031 14.842
2+255.40 14.872 -3.00% -3.00% 14.845 15.034 15.034 14.845
2+256.80 14.874 -3.00% -3.00% 14.847 15.036 15.036 14.847
2+258.20 14.877 -3.00% -3.00% 14.850 15.039 15.039 14.850
2+259.60 14.879 -3.00% -3.00% 14.852 15.041 15.041 14.852
2+261.00 14.882 -3.00% -3.00% 14.855 15.044 15.044 14.855
2+262.40 14.885 -3.00% -3.00% 14.858 15.047 15.047 14.858
2+263.80 14.887 -3.00% -3.00% 14.860 15.049 15.049 14.860
2+265.20 14.890 -3.00% -3.00% 14.863 15.052 15.052 14.863
2+266.60 14.892 -3.00% -3.00% 14.865 15.054 15.054 14.865

54 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+268.00 14.895 -3.00% -3.00% 14.868 15.057 15.057 14.868


2+269.40 14.897 -3.00% -3.00% 14.870 15.059 15.059 14.870
2+270.80 14.900 -3.00% -3.00% 14.873 15.062 15.062 14.873
2+272.20 14.903 -3.00% -3.00% 14.876 15.065 15.065 14.876
2+273.60 14.905 -3.00% -3.00% 14.878 15.067 15.067 14.878
2+275.00 14.908 -3.00% -3.00% 14.881 15.070 15.070 14.881
2+276.40 14.910 -3.00% -3.00% 14.883 15.072 15.072 14.883
2+277.80 14.913 -3.00% -3.00% 14.886 15.075 15.075 14.886
2+279.20 14.915 -3.00% -3.00% 14.888 15.077 15.077 14.888
2+280.60 14.918 -3.00% -3.00% 14.891 15.080 15.080 14.891
2+282.00 14.921 -3.00% -3.00% 14.894 15.083 15.083 14.894
2+283.40 14.923 -3.00% -3.00% 14.896 15.085 15.085 14.896
2+284.80 14.926 -3.00% -3.00% 14.899 15.088 15.088 14.899
2+286.20 14.928 -3.00% -3.00% 14.901 15.090 15.090 14.901
2+287.60 14.931 -3.00% -3.00% 14.904 15.093 15.093 14.904
2+289.00 14.933 -3.00% -3.00% 14.906 15.095 15.095 14.906
2+290.40 14.936 -3.00% -3.00% 14.909 15.098 15.098 14.909
2+291.80 14.939 -3.00% -3.00% 14.912 15.101 15.101 14.912
2+293.20 14.941 -3.00% -3.00% 14.914 15.103 15.103 14.914
2+294.60 14.944 -3.00% -3.00% 14.917 15.106 15.106 14.917
2+296.00 14.946 -3.00% -3.00% 14.919 15.108 15.108 14.919
2+297.40 14.949 -3.00% -3.00% 14.922 15.111 15.111 14.922
2+298.80 14.951 -3.00% -3.00% 14.924 15.113 15.113 14.924
2+300.20 14.954 -3.00% -3.00% 14.927 15.116 15.116 14.927
2+301.60 14.957 -3.00% -3.00% 14.930 15.119 15.119 14.930
2+303.00 14.959 -3.00% -3.00% 14.932 15.121 15.121 14.932
2+304.40 14.962 -3.00% -3.00% 14.935 15.124 15.124 14.935
2+305.80 14.964 -3.00% -3.00% 14.937 15.126 15.126 14.937
2+307.20 14.967 -3.00% -3.00% 14.940 15.129 15.129 14.940
2+308.60 14.970 -3.00% -3.00% 14.943 15.132 15.132 14.943

55 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+310.00 14.972 -3.00% -3.00% 14.945 15.134 15.134 14.945


2+311.40 14.975 -3.00% -3.00% 14.948 15.137 15.137 14.948
2+312.80 14.977 -3.00% -3.00% 14.950 15.139 15.139 14.950
2+314.20 14.980 -3.00% -3.00% 14.953 15.142 15.142 14.953
2+315.60 14.982 -3.00% -3.00% 14.955 15.144 15.144 14.955
2+317.00 14.984 -3.00% -3.00% 14.957 15.146 15.146 14.957
2+318.40 14.986 -3.00% -3.00% 14.959 15.148 15.148 14.959
2+319.80 14.987 -3.00% -3.00% 14.960 15.149 15.149 14.960
2+321.20 14.988 -3.00% -3.00% 14.961 15.150 15.150 14.961
2+322.60 14.989 -3.00% -3.00% 14.962 15.151 15.151 14.962
2+324.00 14.989 -3.00% -3.00% 14.962 15.151 15.151 14.962
2+325.40 14.988 -3.00% -3.00% 14.961 15.150 15.150 14.961
2+326.80 14.988 -3.00% -3.00% 14.961 15.150 15.150 14.961
2+328.20 14.987 -3.00% -3.00% 14.960 15.149 15.149 14.960
2+329.60 14.985 -3.00% -3.00% 14.958 15.147 15.147 14.958
2+331.00 14.983 -3.00% -3.00% 14.956 15.145 15.145 14.956
2+332.40 14.981 -3.00% -3.00% 14.954 15.143 15.143 14.954
2+333.80 14.978 -3.00% -3.00% 14.951 15.140 15.140 14.951
2+335.20 14.975 -3.00% -3.00% 14.948 15.137 15.137 14.948
2+336.60 14.972 -3.00% -3.00% 14.945 15.134 15.134 14.945
2+338.00 14.968 -3.00% -3.00% 14.941 15.130 15.130 14.941
2+339.40 14.963 -3.00% -3.00% 14.936 15.125 15.125 14.936
2+340.80 14.959 -3.00% -3.00% 14.932 15.121 15.121 14.932
2+342.20 14.954 -3.00% -3.00% 14.927 15.116 15.116 14.927
2+343.60 14.948 -3.00% -3.00% 14.921 15.110 15.110 14.921
2+345.00 14.942 -3.00% -3.00% 14.915 15.104 15.104 14.915
2+346.40 14.936 -3.00% -3.00% 14.909 15.098 15.098 14.909
2+347.80 14.929 -3.00% -3.00% 14.902 15.091 15.091 14.902
2+349.20 14.923 -3.00% -3.00% 14.896 15.085 15.085 14.896
2+350.60 14.916 -3.00% -3.00% 14.889 15.078 15.078 14.889

56 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+352.00 14.910 -3.00% -3.00% 14.883 15.072 15.072 14.883


2+353.40 14.903 -3.00% -3.00% 14.876 15.065 15.065 14.876
2+354.80 14.896 -3.00% -3.00% 14.869 15.058 15.058 14.869
2+356.20 14.890 -3.00% -3.00% 14.863 15.052 15.052 14.863
2+357.60 14.883 -3.00% -3.00% 14.856 15.045 15.045 14.856
2+359.00 14.877 -3.00% -3.00% 14.850 15.039 15.039 14.850
2+360.40 14.870 -3.00% -3.00% 14.843 15.032 15.032 14.843
2+361.80 14.864 -3.00% -3.00% 14.837 15.026 15.026 14.837
2+363.20 14.857 -3.00% -3.00% 14.830 15.019 15.019 14.830
2+364.60 14.850 -3.00% -3.00% 14.823 15.012 15.012 14.823
2+366.00 14.844 -3.00% -3.00% 14.817 15.006 15.006 14.817
2+367.40 14.837 -3.00% -3.00% 14.810 14.999 14.999 14.810
2+368.80 14.831 -3.00% -3.00% 14.804 14.993 14.993 14.804
2+370.20 14.824 -3.00% -3.00% 14.797 14.986 14.986 14.797
2+371.60 14.818 -3.00% -3.00% 14.791 14.980 14.980 14.791
2+373.00 14.811 -3.00% -3.00% 14.784 14.973 14.973 14.784
2+374.40 14.804 -3.00% -3.00% 14.777 14.966 14.966 14.777
2+375.80 14.798 -3.00% -3.00% 14.771 14.960 14.960 14.771
2+377.20 14.791 -3.00% -3.00% 14.764 14.953 14.953 14.764
2+378.60 14.785 -3.00% -3.00% 14.758 14.947 14.947 14.758
2+380.00 14.778 -3.00% -3.00% 14.751 14.940 14.940 14.751
2+381.40 14.772 -3.00% -3.00% 14.745 14.934 14.934 14.745
2+382.80 14.765 -3.00% -3.00% 14.738 14.927 14.927 14.738
2+384.20 14.758 -3.00% -3.00% 14.731 14.920 14.920 14.731
2+385.60 14.752 -3.00% -3.00% 14.725 14.914 14.914 14.725
2+387.00 14.745 -3.00% -3.00% 14.718 14.907 14.907 14.718
2+388.40 14.739 -3.00% -3.00% 14.712 14.901 14.901 14.712
2+389.80 14.732 -3.00% -3.00% 14.705 14.894 14.894 14.705
2+391.20 14.726 -3.00% -3.00% 14.699 14.888 14.888 14.699
2+392.60 14.719 -3.00% -3.00% 14.692 14.881 14.881 14.692

57 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+394.00 14.713 -3.00% -3.00% 14.686 14.875 14.875 14.686


2+395.40 14.706 -3.00% -3.00% 14.679 14.868 14.868 14.679
2+396.80 14.699 -3.00% -3.00% 14.672 14.861 14.861 14.672
2+398.20 14.693 -3.00% -3.00% 14.666 14.855 14.855 14.666
2+399.60 14.686 -3.00% -3.00% 14.659 14.848 14.848 14.659
2+401.00 14.680 -3.00% -3.00% 14.653 14.842 14.842 14.653
2+402.40 14.673 -3.00% -3.00% 14.646 14.835 14.835 14.646
2+403.80 14.667 -3.00% -3.00% 14.640 14.829 14.829 14.640
2+405.20 14.660 -3.00% -3.00% 14.633 14.822 14.822 14.633
2+406.60 14.653 -3.00% -3.00% 14.626 14.815 14.815 14.626
2+408.00 14.647 -3.00% -3.00% 14.620 14.809 14.809 14.620
2+409.40 14.640 -3.00% -3.00% 14.613 14.802 14.802 14.613
2+410.80 14.634 -3.00% -3.00% 14.607 14.796 14.796 14.607
2+412.20 14.627 -3.00% -3.00% 14.600 14.789 14.789 14.600
2+413.60 14.621 -3.00% -3.00% 14.594 14.783 14.783 14.594
2+415.00 14.614 -3.00% -3.00% 14.587 14.776 14.776 14.587
2+416.40 14.607 -3.00% -3.00% 14.580 14.769 14.769 14.580
2+417.80 14.601 -3.00% -3.00% 14.574 14.763 14.763 14.574
2+419.20 14.594 -3.00% -3.00% 14.567 14.756 14.756 14.567
2+420.60 14.588 -3.00% -3.00% 14.561 14.750 14.750 14.561
2+422.00 14.581 -3.00% -3.00% 14.554 14.743 14.743 14.554
2+423.40 14.575 -3.00% -3.00% 14.548 14.737 14.737 14.548
2+424.80 14.568 -3.00% -3.00% 14.541 14.730 14.730 14.541
2+426.20 14.561 -3.00% -3.00% 14.534 14.723 14.723 14.534
2+427.60 14.555 -3.00% -3.00% 14.528 14.717 14.717 14.528
2+429.00 14.548 -3.00% -3.00% 14.521 14.710 14.710 14.521
2+430.40 14.542 -3.00% -3.00% 14.515 14.704 14.704 14.515
2+431.80 14.535 -3.00% -3.00% 14.508 14.697 14.697 14.508
2+433.20 14.529 -3.00% -3.00% 14.502 14.691 14.691 14.502
2+434.60 14.522 -3.00% -3.00% 14.495 14.684 14.684 14.495

58 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+436.00 14.515 -3.00% -3.00% 14.488 14.677 14.677 14.488


2+437.40 14.509 -3.00% -3.00% 14.482 14.671 14.671 14.482
2+438.80 14.502 -3.00% -3.00% 14.475 14.664 14.664 14.475
2+440.20 14.496 -3.00% -3.00% 14.469 14.658 14.658 14.469
2+441.60 14.489 -3.00% -3.00% 14.462 14.651 14.651 14.462
2+443.00 14.483 -3.00% -3.00% 14.456 14.645 14.645 14.456
2+444.40 14.476 -3.00% -3.00% 14.449 14.638 14.638 14.449
2+445.80 14.469 -3.00% -3.00% 14.442 14.631 14.631 14.442
2+447.20 14.463 -3.00% -3.00% 14.436 14.625 14.625 14.436
2+448.60 14.456 -3.00% -3.00% 14.429 14.618 14.618 14.429
2+450.00 14.450 -3.00% -3.00% 14.423 14.612 14.612 14.423
2+451.40 14.443 -3.00% -3.00% 14.416 14.605 14.605 14.416
2+452.80 14.437 -3.00% -3.00% 14.410 14.599 14.599 14.410
2+454.20 14.430 -3.00% -3.00% 14.403 14.592 14.592 14.403
2+455.60 14.423 -3.00% -3.00% 14.396 14.585 14.585 14.396
2+457.00 14.417 -3.00% -3.00% 14.390 14.579 14.579 14.390
2+458.40 14.410 -3.00% -3.00% 14.383 14.572 14.572 14.383
2+459.80 14.404 -3.00% -3.00% 14.377 14.566 14.566 14.377
2+461.20 14.397 -3.00% -3.00% 14.370 14.559 14.559 14.370
2+462.60 14.391 -3.00% -3.00% 14.364 14.553 14.553 14.364
2+464.00 14.384 -3.00% -3.00% 14.357 14.546 14.546 14.357
2+465.40 14.377 -3.00% -3.00% 14.350 14.539 14.539 14.350
2+466.80 14.371 -3.00% -3.00% 14.344 14.533 14.533 14.344
2+468.20 14.364 -3.00% -3.00% 14.337 14.526 14.526 14.337
2+469.60 14.358 -3.00% -3.00% 14.331 14.520 14.520 14.331
2+471.00 14.351 -3.00% -3.00% 14.324 14.513 14.513 14.324
2+472.40 14.345 -3.00% -3.00% 14.318 14.507 14.507 14.318
2+473.80 14.338 -3.00% -3.00% 14.311 14.500 14.500 14.311
2+475.20 14.331 -3.00% -3.00% 14.304 14.493 14.493 14.304
2+476.60 14.325 -3.00% -3.00% 14.298 14.487 14.487 14.298

59 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+478.00 14.318 -3.00% -3.00% 14.291 14.480 14.480 14.291


2+479.40 14.312 -3.00% -3.00% 14.285 14.474 14.474 14.285
2+480.80 14.305 -3.00% -3.00% 14.278 14.467 14.467 14.278
2+482.20 14.299 -3.00% -3.00% 14.272 14.461 14.461 14.272
2+483.60 14.292 -3.00% -3.00% 14.265 14.454 14.454 14.265
2+485.00 14.285 -3.00% -3.00% 14.258 14.447 14.447 14.258
2+486.40 14.279 -3.00% -3.00% 14.252 14.441 14.441 14.252
2+487.80 14.272 -3.00% -3.00% 14.245 14.434 14.434 14.245
2+489.20 14.266 -3.00% -3.00% 14.239 14.428 14.428 14.239
2+490.60 14.259 -3.00% -3.00% 14.232 14.421 14.421 14.232
2+492.00 14.253 -3.00% -3.00% 14.226 14.415 14.415 14.226
2+493.40 14.246 -3.00% -3.00% 14.219 14.408 14.408 14.219
2+494.80 14.240 -3.00% -3.00% 14.213 14.402 14.402 14.213
2+496.20 14.233 -3.00% -3.00% 14.206 14.395 14.395 14.206
2+497.60 14.226 -3.00% -3.00% 14.199 14.388 14.388 14.199
2+499.00 14.220 -3.00% -3.00% 14.193 14.382 14.382 14.193
2+500.40 14.213 -3.00% -3.00% 14.186 14.375 14.375 14.186
2+501.80 14.207 -3.00% -3.00% 14.180 14.369 14.369 14.180
2+503.20 14.200 -3.00% -3.00% 14.173 14.362 14.362 14.173
2+504.60 14.194 -3.00% -3.00% 14.167 14.356 14.356 14.167
2+506.00 14.187 -3.00% -3.00% 14.160 14.349 14.349 14.160
2+507.40 14.180 -3.00% -3.00% 14.153 14.342 14.342 14.153
2+508.80 14.174 -3.00% -3.00% 14.147 14.336 14.336 14.147
2+510.20 14.167 -3.00% -3.00% 14.140 14.329 14.329 14.140
2+511.60 14.161 -3.00% -3.00% 14.134 14.323 14.323 14.134
2+513.00 14.154 -3.00% -3.00% 14.127 14.316 14.316 14.127
2+514.40 14.148 -3.00% -3.00% 14.121 14.310 14.310 14.121
2+515.80 14.142 -3.00% -3.00% 14.115 14.304 14.304 14.115
2+517.20 14.135 -3.00% -3.00% 14.108 14.297 14.297 14.108
2+518.60 14.129 -3.00% -3.00% 14.102 14.291 14.291 14.102

60 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+520.00 14.123 -3.00% -3.00% 14.096 14.285 14.285 14.096


2+521.40 14.117 -3.00% -3.00% 14.090 14.279 14.279 14.090
2+522.80 14.111 -3.00% -3.00% 14.084 14.273 14.273 14.084
2+524.20 14.105 -3.00% -3.00% 14.078 14.267 14.267 14.078
2+525.60 14.099 -3.00% -3.00% 14.072 14.261 14.261 14.072
2+527.00 14.093 -3.00% -3.00% 14.066 14.255 14.255 14.066
2+528.40 14.087 -3.00% -3.00% 14.060 14.249 14.249 14.060
2+529.80 14.082 -3.00% -3.00% 14.055 14.244 14.244 14.055
2+531.20 14.076 -3.00% -3.00% 14.049 14.238 14.238 14.049
2+532.60 14.070 -3.00% -3.00% 14.043 14.232 14.232 14.043
2+534.00 14.065 -3.00% -3.00% 14.038 14.227 14.227 14.038
2+535.40 14.059 -3.00% -3.00% 14.032 14.221 14.221 14.032
2+536.80 14.054 -3.00% -3.00% 14.027 14.216 14.216 14.027
2+538.20 14.048 -3.00% -3.00% 14.021 14.210 14.210 14.021
2+539.60 14.043 -3.00% -3.00% 14.016 14.205 14.205 14.016
2+541.00 14.038 -3.00% -3.00% 14.011 14.200 14.200 14.011
2+542.40 14.033 -3.00% -3.00% 14.006 14.195 14.195 14.006
2+543.80 14.027 -3.00% -3.00% 14.000 14.189 14.189 14.000
2+545.20 14.022 -3.00% -3.00% 13.995 14.184 14.184 13.995
2+546.60 14.017 -3.00% -3.00% 13.990 14.179 14.179 13.990
2+548.00 14.012 -3.00% -3.00% 13.985 14.174 14.174 13.985
2+549.40 14.007 -3.00% -3.00% 13.980 14.169 14.169 13.980
2+550.80 14.002 -3.00% -3.00% 13.975 14.164 14.164 13.975
2+552.20 13.998 -3.00% -3.00% 13.971 14.160 14.160 13.971
2+553.60 13.993 -3.00% -3.00% 13.966 14.155 14.155 13.966
2+555.00 13.988 -3.00% -3.00% 13.961 14.150 14.150 13.961
2+556.40 13.983 -3.00% -3.00% 13.956 14.145 14.145 13.956
2+557.80 13.979 -3.00% -3.00% 13.952 14.141 14.141 13.952
2+559.20 13.974 -3.00% -3.00% 13.947 14.136 14.136 13.947
2+560.60 13.970 -3.00% -3.00% 13.943 14.132 14.132 13.943

61 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+562.00 13.965 -3.00% -3.00% 13.938 14.127 14.127 13.938


2+563.40 13.961 -3.00% -3.00% 13.934 14.123 14.123 13.934
2+564.80 13.957 -3.00% -3.00% 13.930 14.119 14.119 13.930
2+566.20 13.952 -3.00% -3.00% 13.925 14.114 14.114 13.925
2+567.60 13.948 -3.00% -3.00% 13.921 14.110 14.110 13.921
2+569.00 13.944 -3.00% -3.00% 13.917 14.106 14.106 13.917
2+570.40 13.940 -3.00% -3.00% 13.913 14.102 14.102 13.913
2+571.80 13.936 -3.00% -3.00% 13.909 14.098 14.098 13.909
2+573.20 13.932 -3.00% -3.00% 13.905 14.094 14.094 13.905
2+574.60 13.928 -3.00% -3.00% 13.901 14.090 14.090 13.901
2+576.00 13.924 -3.00% -3.00% 13.897 14.086 14.086 13.897
2+577.40 13.920 -3.00% -3.00% 13.893 14.082 14.082 13.893
2+578.80 13.917 -3.00% -3.00% 13.890 14.079 14.079 13.890
2+580.20 13.913 -3.00% -3.00% 13.886 14.075 14.075 13.886
2+581.60 13.909 -3.00% -3.00% 13.882 14.071 14.071 13.882
2+583.00 13.906 -3.00% -3.00% 13.879 14.068 14.068 13.879
2+584.40 13.902 -3.00% -3.00% 13.875 14.064 14.064 13.875
2+585.80 13.899 -3.00% -3.00% 13.872 14.061 14.061 13.872
2+587.20 13.895 -3.00% -3.00% 13.868 14.057 14.057 13.868
2+588.60 13.892 -3.00% -3.00% 13.865 14.054 14.054 13.865
2+590.00 13.889 -3.00% -3.00% 13.862 14.051 14.051 13.862
2+591.40 13.885 -3.00% -3.00% 13.858 14.047 14.047 13.858
2+592.80 13.882 -3.00% -3.00% 13.855 14.044 14.044 13.855
2+594.20 13.879 -3.00% -3.00% 13.852 14.041 14.041 13.852
2+595.60 13.876 -3.00% -3.00% 13.849 14.038 14.038 13.849
2+597.00 13.873 -3.00% -3.00% 13.846 14.035 14.035 13.846
2+598.40 13.870 -3.00% -3.00% 13.843 14.032 14.032 13.843
2+599.80 13.867 -3.00% -3.00% 13.840 14.029 14.029 13.840
2+601.20 13.864 -3.00% -3.00% 13.837 14.026 14.026 13.837
2+602.60 13.862 -3.00% -3.00% 13.835 14.024 14.024 13.835

62 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+604.00 13.859 -3.00% -3.00% 13.832 14.021 14.021 13.832


2+605.40 13.856 -3.00% -2.89% 13.829 14.018 14.016 13.834
2+606.80 13.854 -3.00% -2.71% 13.827 14.016 14.012 13.841
2+608.20 13.851 -3.00% -2.54% 13.824 14.013 14.007 13.847
2+609.60 13.849 -3.00% -2.36% 13.822 14.011 14.002 13.853
2+611.00 13.846 -3.00% -2.18% 13.819 14.008 13.997 13.859
2+612.40 13.844 -3.00% -2.01% 13.817 14.006 13.992 13.866
2+613.80 13.842 -3.00% -1.83% 13.815 14.004 13.988 13.872
2+615.20 13.839 -3.00% -1.66% 13.812 14.001 13.982 13.878
2+616.60 13.837 -3.00% -1.48% 13.810 13.999 13.978 13.885
2+618.00 13.835 -3.00% -1.30% 13.808 13.997 13.973 13.891
2+619.40 13.833 -3.00% -1.13% 13.806 13.995 13.969 13.898
2+620.80 13.831 -3.00% -0.95% 13.804 13.993 13.964 13.904
2+622.20 13.829 -3.00% -0.77% 13.802 13.991 13.960 13.911
2+623.60 13.827 -3.00% -0.60% 13.800 13.989 13.955 13.918
2+625.00 13.825 -3.00% -0.42% 13.798 13.987 13.951 13.924
2+626.40 13.823 -3.00% -0.24% 13.796 13.985 13.946 13.931
2+627.80 13.821 -3.00% -0.07% 13.794 13.983 13.942 13.938
2+629.20 13.820 -3.00% 0.11% 13.793 13.982 13.938 13.945
2+630.60 13.818 -3.00% 0.29% 13.791 13.980 13.934 13.952
2+632.00 13.817 -3.00% 0.46% 13.790 13.979 13.931 13.960
2+633.40 13.815 -3.00% 0.64% 13.788 13.977 13.926 13.966
2+634.80 13.814 -3.00% 0.81% 13.787 13.976 13.923 13.974
2+636.20 13.812 -3.00% 0.99% 13.785 13.974 13.918 13.981
2+637.60 13.811 -3.00% 1.17% 13.784 13.973 13.915 13.988
2+639.00 13.809 -3.00% 1.34% 13.782 13.971 13.910 13.995
2+640.40 13.808 -3.00% 1.52% 13.781 13.970 13.907 14.002
2+641.80 13.807 -3.00% 1.70% 13.780 13.969 13.903 14.010
2+643.20 13.806 -3.00% 1.87% 13.779 13.968 13.900 14.018
2+644.60 13.805 -3.00% 2.05% 13.778 13.967 13.896 14.025

63 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+646.00 13.804 -3.00% 2.23% 13.777 13.966 13.893 14.033


2+647.40 13.803 -3.00% 2.40% 13.776 13.965 13.889 14.041
2+648.80 13.802 -3.00% 2.58% 13.775 13.964 13.886 14.048
2+650.20 13.801 -3.00% 2.75% 13.774 13.963 13.882 14.056
2+651.60 13.800 -3.05% 2.93% 13.771 13.963 13.879 14.064
2+653.00 13.800 -3.22% 3.11% 13.762 13.965 13.876 14.072
2+654.40 13.799 -3.39% 3.28% 13.753 13.966 13.873 14.080
2+655.80 13.798 -3.55% 3.46% 13.744 13.968 13.870 14.088
2+657.20 13.798 -3.72% 3.64% 13.736 13.970 13.867 14.096
2+658.60 13.797 -3.89% 3.81% 13.726 13.971 13.864 14.104
2+660.00 13.797 -4.06% 3.99% 13.718 13.974 13.861 14.113
2+661.40 13.797 -4.23% 4.17% 13.710 13.976 13.859 14.121
2+662.80 13.796 -4.39% 4.34% 13.701 13.978 13.855 14.129
2+664.20 13.796 -4.56% 4.52% 13.693 13.980 13.853 14.137
2+665.60 13.796 -4.73% 4.70% 13.684 13.982 13.850 14.146
2+667.00 13.796 -4.90% 4.87% 13.676 13.985 13.848 14.155
2+668.40 13.795 -5.07% 5.05% 13.667 13.986 13.844 14.162
2+669.80 13.795 -5.23% 5.22% 13.659 13.988 13.842 14.171
2+671.20 13.795 -5.40% 5.40% 13.650 13.991 13.839 14.180
2+672.60 13.796 -5.40% 5.40% 13.651 13.992 13.840 14.181
2+674.00 13.796 -5.40% 5.40% 13.651 13.992 13.840 14.181
2+675.40 13.796 -5.40% 5.40% 13.651 13.992 13.840 14.181
2+676.80 13.796 -5.40% 5.40% 13.651 13.992 13.840 14.181
2+678.20 13.796 -5.40% 5.40% 13.651 13.992 13.840 14.181
2+679.60 13.797 -5.40% 5.40% 13.652 13.993 13.841 14.182
2+681.00 13.797 -5.40% 5.40% 13.652 13.993 13.841 14.182
2+682.40 13.798 -5.40% 5.40% 13.653 13.994 13.842 14.183
2+683.80 13.798 -5.40% 5.40% 13.653 13.994 13.842 14.183
2+685.20 13.799 -5.40% 5.40% 13.654 13.995 13.843 14.184
2+686.60 13.799 -5.40% 5.40% 13.654 13.995 13.843 14.184

64 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+688.00 13.800 -5.40% 5.40% 13.655 13.996 13.844 14.185


2+689.40 13.801 -5.40% 5.40% 13.656 13.997 13.845 14.186
2+690.80 13.802 -5.40% 5.40% 13.657 13.998 13.846 14.187
2+692.20 13.803 -5.40% 5.40% 13.658 13.999 13.847 14.188
2+693.60 13.803 -5.40% 5.40% 13.658 13.999 13.847 14.188
2+695.00 13.804 -5.40% 5.40% 13.659 14.000 13.848 14.189
2+696.40 13.806 -5.40% 5.40% 13.661 14.002 13.850 14.191
2+697.80 13.807 -5.40% 5.40% 13.662 14.003 13.851 14.192
2+699.20 13.808 -5.40% 5.40% 13.663 14.004 13.852 14.193
2+700.60 13.809 -5.40% 5.40% 13.664 14.005 13.853 14.194
2+702.00 13.810 -5.40% 5.40% 13.665 14.006 13.854 14.195
2+703.40 13.812 -5.40% 5.40% 13.667 14.008 13.856 14.197
2+704.80 13.813 -5.40% 5.40% 13.668 14.009 13.857 14.198
2+706.20 13.814 -5.40% 5.40% 13.669 14.010 13.858 14.199
2+707.60 13.816 -5.40% 5.40% 13.671 14.012 13.860 14.201
2+709.00 13.817 -5.40% 5.40% 13.672 14.013 13.861 14.202
2+710.40 13.819 -5.40% 5.40% 13.674 14.015 13.863 14.204
2+711.80 13.821 -5.40% 5.40% 13.676 14.017 13.865 14.206
2+713.20 13.822 -5.40% 5.40% 13.677 14.018 13.866 14.207
2+714.60 13.824 -5.40% 5.40% 13.679 14.020 13.868 14.209
2+716.00 13.826 -5.40% 5.40% 13.681 14.022 13.870 14.211
2+717.40 13.828 -5.40% 5.40% 13.683 14.024 13.872 14.213
2+718.80 13.830 -5.40% 5.40% 13.685 14.026 13.874 14.215
2+720.20 13.832 -5.40% 5.40% 13.687 14.028 13.876 14.217
2+721.60 13.834 -5.40% 5.40% 13.689 14.030 13.878 14.219
2+723.00 13.836 -5.40% 5.40% 13.691 14.032 13.880 14.221
2+724.40 13.838 -5.40% 5.40% 13.693 14.034 13.882 14.223
2+725.80 13.841 -5.40% 5.40% 13.696 14.037 13.885 14.226
2+727.20 13.843 -5.40% 5.40% 13.698 14.039 13.887 14.228
2+728.60 13.845 -5.40% 5.40% 13.700 14.041 13.889 14.230

65 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+730.00 13.848 -5.40% 5.40% 13.703 14.044 13.892 14.233


2+731.40 13.850 -5.40% 5.40% 13.705 14.046 13.894 14.235
2+732.80 13.853 -5.40% 5.40% 13.708 14.049 13.897 14.238
2+734.20 13.855 -5.40% 5.40% 13.710 14.051 13.899 14.240
2+735.60 13.858 -5.40% 5.40% 13.713 14.054 13.902 14.243
2+737.00 13.860 -5.40% 5.40% 13.715 14.056 13.904 14.245
2+738.40 13.863 -5.40% 5.40% 13.718 14.059 13.907 14.248
2+739.80 13.865 -5.40% 5.40% 13.720 14.061 13.909 14.250
2+741.20 13.868 -5.40% 5.40% 13.723 14.064 13.912 14.253
2+742.60 13.870 -5.40% 5.40% 13.725 14.066 13.914 14.255
2+744.00 13.873 -5.40% 5.40% 13.728 14.069 13.917 14.258
2+745.40 13.875 -5.40% 5.40% 13.730 14.071 13.919 14.260
2+746.80 13.878 -5.40% 5.40% 13.733 14.074 13.922 14.263
2+748.20 13.880 -5.40% 5.40% 13.735 14.076 13.924 14.265
2+749.60 13.883 -5.40% 5.40% 13.738 14.079 13.927 14.268
2+751.00 13.885 -5.40% 5.40% 13.740 14.081 13.929 14.270
2+752.40 13.888 -5.40% 5.40% 13.743 14.084 13.932 14.273
2+753.80 13.891 -5.40% 5.40% 13.746 14.087 13.935 14.276
2+755.20 13.893 -5.40% 5.40% 13.748 14.089 13.937 14.278
2+756.60 13.896 -5.40% 5.40% 13.751 14.092 13.940 14.281
2+758.00 13.898 -5.40% 5.40% 13.753 14.094 13.942 14.283
2+759.40 13.901 -5.40% 5.40% 13.756 14.097 13.945 14.286
2+760.80 13.903 -5.40% 5.40% 13.758 14.099 13.947 14.288
2+762.20 13.906 -5.40% 5.40% 13.761 14.102 13.950 14.291
2+763.60 13.908 -5.40% 5.40% 13.763 14.104 13.952 14.293
2+765.00 13.911 -5.40% 5.40% 13.766 14.107 13.955 14.296
2+766.40 13.913 -5.40% 5.40% 13.768 14.109 13.957 14.298
2+767.80 13.916 -5.40% 5.40% 13.771 14.112 13.960 14.301
2+769.20 13.918 -5.40% 5.40% 13.773 14.114 13.962 14.303
2+770.60 13.921 -5.40% 5.40% 13.776 14.117 13.965 14.306

66 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+772.00 13.923 -5.40% 5.40% 13.778 14.119 13.967 14.308


2+773.40 13.926 -5.40% 5.40% 13.781 14.122 13.970 14.311
2+774.80 13.928 -5.40% 5.40% 13.783 14.124 13.972 14.313
2+776.20 13.931 -5.40% 5.40% 13.786 14.127 13.975 14.316
2+777.60 13.933 -5.40% 5.40% 13.788 14.129 13.977 14.318
2+779.00 13.936 -5.40% 5.40% 13.791 14.132 13.980 14.321
2+780.40 13.938 -5.40% 5.40% 13.793 14.134 13.982 14.323
2+781.80 13.941 -5.40% 5.40% 13.796 14.137 13.985 14.326
2+783.20 13.944 -5.40% 5.40% 13.799 14.140 13.988 14.329
2+784.60 13.946 -5.40% 5.40% 13.801 14.142 13.990 14.331
2+786.00 13.949 -5.40% 5.40% 13.804 14.145 13.993 14.334
2+787.40 13.951 -5.40% 5.40% 13.806 14.147 13.995 14.336
2+788.80 13.954 -5.40% 5.40% 13.809 14.150 13.998 14.339
2+790.20 13.956 -5.40% 5.40% 13.811 14.152 14.000 14.341
2+791.60 13.959 -5.40% 5.40% 13.814 14.155 14.003 14.344
2+793.00 13.961 -5.40% 5.40% 13.816 14.157 14.005 14.346
2+794.40 13.964 -5.40% 5.40% 13.819 14.160 14.008 14.349
2+795.80 13.966 -5.40% 5.40% 13.821 14.162 14.010 14.351
2+797.20 13.969 -5.40% 5.40% 13.824 14.165 14.013 14.354
2+798.60 13.971 -5.40% 5.40% 13.826 14.167 14.015 14.356
2+800.00 13.974 -5.40% 5.40% 13.829 14.170 14.018 14.359
2+801.40 13.976 -5.40% 5.40% 13.831 14.172 14.020 14.361
2+802.80 13.979 -5.40% 5.40% 13.834 14.175 14.023 14.364
2+804.20 13.981 -5.40% 5.40% 13.836 14.177 14.025 14.366
2+805.60 13.984 -5.40% 5.40% 13.839 14.180 14.028 14.369
2+807.00 13.986 -5.40% 5.40% 13.841 14.182 14.030 14.371
2+808.40 13.989 -5.40% 5.40% 13.844 14.185 14.033 14.374
2+809.80 13.992 -5.40% 5.40% 13.847 14.188 14.036 14.377
2+811.20 13.994 -5.40% 5.40% 13.849 14.190 14.038 14.379
2+812.60 13.997 -5.40% 5.40% 13.852 14.193 14.041 14.382

67 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+814.00 13.999 -5.40% 5.40% 13.854 14.195 14.043 14.384


2+815.40 14.002 -5.40% 5.40% 13.857 14.198 14.046 14.387
2+816.80 14.004 -5.40% 5.40% 13.859 14.200 14.048 14.389
2+818.20 14.007 -5.40% 5.40% 13.862 14.203 14.051 14.392
2+819.60 14.009 -5.40% 5.40% 13.864 14.205 14.053 14.394
2+821.00 14.012 -5.40% 5.40% 13.867 14.208 14.056 14.397
2+822.40 14.014 -5.40% 5.40% 13.869 14.210 14.058 14.399
2+823.80 14.016 -5.40% 5.40% 13.871 14.212 14.060 14.401
2+825.20 14.018 -5.40% 5.40% 13.873 14.214 14.062 14.403
2+826.60 14.020 -5.40% 5.40% 13.875 14.216 14.064 14.405
2+828.00 14.022 -5.40% 5.40% 13.877 14.218 14.066 14.407
2+829.40 14.024 -5.40% 5.40% 13.879 14.220 14.068 14.409
2+830.80 14.025 -5.40% 5.40% 13.880 14.221 14.069 14.410
2+832.20 14.026 -5.40% 5.40% 13.881 14.222 14.070 14.411
2+833.60 14.027 -5.40% 5.40% 13.882 14.223 14.071 14.412
2+835.00 14.028 -5.40% 5.40% 13.883 14.224 14.072 14.413
2+836.40 14.029 -5.40% 5.40% 13.884 14.225 14.073 14.414
2+837.80 14.030 -5.40% 5.40% 13.885 14.226 14.074 14.415
2+839.20 14.031 -5.40% 5.40% 13.886 14.227 14.075 14.416
2+840.60 14.031 -5.40% 5.40% 13.886 14.227 14.075 14.416
2+842.00 14.031 -5.40% 5.40% 13.886 14.227 14.075 14.416
2+843.40 14.031 -5.40% 5.40% 13.886 14.227 14.075 14.416
2+844.80 14.031 -5.40% 5.40% 13.886 14.227 14.075 14.416
2+846.20 14.031 -5.40% 5.40% 13.886 14.227 14.075 14.416
2+847.60 14.031 -5.40% 5.40% 13.886 14.227 14.075 14.416
2+849.00 14.031 -5.40% 5.40% 13.886 14.227 14.075 14.416
2+850.40 14.030 -5.40% 5.40% 13.885 14.226 14.074 14.415
2+851.80 14.029 -5.40% 5.40% 13.884 14.225 14.073 14.414
2+853.20 14.028 -5.40% 5.40% 13.883 14.224 14.072 14.413
2+854.60 14.027 -5.40% 5.40% 13.882 14.223 14.071 14.412

68 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+856.00 14.026 -5.40% 5.40% 13.881 14.222 14.070 14.411


2+857.40 14.025 -5.40% 5.40% 13.880 14.221 14.069 14.410
2+858.80 14.023 -5.40% 5.40% 13.878 14.219 14.067 14.408
2+860.20 14.022 -5.40% 5.40% 13.877 14.218 14.066 14.407
2+861.60 14.020 -5.40% 5.40% 13.875 14.216 14.064 14.405
2+863.00 14.018 -5.40% 5.40% 13.873 14.214 14.062 14.403
2+864.40 14.016 -5.40% 5.40% 13.871 14.212 14.060 14.401
2+865.80 14.014 -5.40% 5.40% 13.869 14.210 14.058 14.399
2+867.20 14.011 -5.40% 5.40% 13.866 14.207 14.055 14.396
2+868.60 14.009 -5.40% 5.40% 13.864 14.205 14.053 14.394
2+870.00 14.006 -5.40% 5.40% 13.861 14.202 14.050 14.391
2+871.40 14.003 -5.40% 5.40% 13.858 14.199 14.047 14.388
2+872.80 14.000 -5.40% 5.40% 13.855 14.196 14.044 14.385
2+874.20 13.997 -5.40% 5.40% 13.852 14.193 14.041 14.382
2+875.60 13.994 -5.40% 5.40% 13.849 14.190 14.038 14.379
2+877.00 13.990 -5.40% 5.40% 13.845 14.186 14.034 14.375
2+878.40 13.987 -5.40% 5.40% 13.842 14.183 14.031 14.372
2+879.80 13.983 -5.40% 5.40% 13.838 14.179 14.027 14.368
2+881.20 13.979 -5.40% 5.40% 13.834 14.175 14.023 14.364
2+882.60 13.975 -5.40% 5.40% 13.830 14.171 14.019 14.360
2+884.00 13.971 -5.40% 5.40% 13.826 14.167 14.015 14.356
2+885.40 13.967 -5.40% 5.40% 13.822 14.163 14.011 14.352
2+886.80 13.962 -5.40% 5.40% 13.817 14.158 14.006 14.347
2+888.20 13.958 -5.40% 5.40% 13.813 14.154 14.002 14.343
2+889.60 13.953 -5.40% 5.40% 13.808 14.149 13.997 14.338
2+891.00 13.948 -5.40% 5.40% 13.803 14.144 13.992 14.333
2+892.40 13.943 -5.40% 5.40% 13.798 14.139 13.987 14.328
2+893.80 13.938 -5.40% 5.40% 13.793 14.134 13.982 14.323
2+895.20 13.933 -5.40% 5.40% 13.788 14.129 13.977 14.318
2+896.60 13.927 -5.40% 5.40% 13.782 14.123 13.971 14.312

69 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+898.00 13.922 -5.40% 5.40% 13.777 14.118 13.966 14.307


2+899.40 13.916 -5.40% 5.40% 13.771 14.112 13.960 14.301
2+900.80 13.910 -5.40% 5.40% 13.765 14.106 13.954 14.295
2+902.20 13.904 -5.40% 5.40% 13.759 14.100 13.948 14.289
2+903.60 13.898 -5.40% 5.40% 13.753 14.094 13.942 14.283
2+905.00 13.891 -5.40% 5.40% 13.746 14.087 13.935 14.276
2+906.40 13.885 -5.40% 5.40% 13.740 14.081 13.929 14.270
2+907.80 13.878 -5.40% 5.40% 13.733 14.074 13.922 14.263
2+909.20 13.871 -5.40% 5.40% 13.726 14.067 13.915 14.256
2+910.60 13.864 -5.40% 5.40% 13.719 14.060 13.908 14.249
2+912.00 13.857 -5.40% 5.40% 13.712 14.053 13.901 14.242
2+913.40 13.850 -5.40% 5.40% 13.705 14.046 13.894 14.235
2+914.80 13.843 -5.40% 5.40% 13.698 14.039 13.887 14.228
2+916.20 13.835 -5.40% 5.40% 13.690 14.031 13.879 14.220
2+917.60 13.828 -5.40% 5.40% 13.683 14.024 13.872 14.213
2+919.00 13.820 -5.40% 5.40% 13.675 14.016 13.864 14.205
2+920.40 13.812 -5.37% 5.37% 13.669 14.007 13.857 14.195
2+921.80 13.804 -5.21% 5.20% 13.669 13.997 13.851 14.179
2+923.20 13.796 -5.04% 5.02% 13.669 13.987 13.846 14.162
2+924.60 13.788 -4.87% 4.84% 13.669 13.976 13.840 14.145
2+926.00 13.780 -4.70% 4.67% 13.670 13.966 13.835 14.129
2+927.40 13.772 -4.53% 4.49% 13.670 13.955 13.829 14.112
2+928.80 13.764 -4.37% 4.31% 13.670 13.945 13.824 14.095
2+930.20 13.756 -4.20% 4.14% 13.670 13.935 13.818 14.079
2+931.60 13.748 -4.03% 3.96% 13.671 13.924 13.813 14.062
2+933.00 13.740 -3.86% 3.78% 13.671 13.914 13.807 14.045
2+934.40 13.732 -3.69% 3.61% 13.671 13.904 13.801 14.029
2+935.80 13.724 -3.53% 3.43% 13.671 13.893 13.796 14.012
2+937.20 13.716 -3.36% 3.26% 13.671 13.883 13.790 13.996
2+938.60 13.708 -3.19% 3.08% 13.672 13.873 13.785 13.979

70 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+940.00 13.700 -3.02% 2.90% 13.672 13.862 13.779 13.962


2+941.40 13.692 -3.00% 2.73% 13.665 13.854 13.774 13.946
2+942.80 13.684 -3.00% 2.55% 13.657 13.846 13.768 13.929
2+944.20 13.676 -3.00% 2.37% 13.649 13.838 13.763 13.912
2+945.60 13.668 -3.00% 2.20% 13.641 13.830 13.757 13.896
2+947.00 13.660 -3.00% 2.02% 13.633 13.822 13.752 13.879
2+948.40 13.652 -3.00% 1.84% 13.625 13.814 13.746 13.862
2+949.80 13.644 -3.00% 1.67% 13.617 13.806 13.741 13.846
2+951.20 13.636 -3.00% 1.49% 13.609 13.798 13.735 13.829
2+952.60 13.628 -3.00% 1.31% 13.601 13.790 13.730 13.812
2+954.00 13.620 -3.00% 1.14% 13.593 13.782 13.724 13.796
2+955.40 13.612 -3.00% 0.96% 13.585 13.774 13.719 13.779
2+956.80 13.604 -3.00% 0.79% 13.577 13.766 13.713 13.762
2+958.20 13.596 -3.00% 0.61% 13.569 13.758 13.707 13.746
2+959.60 13.588 -3.00% 0.43% 13.561 13.750 13.702 13.729
2+961.00 13.580 -3.00% 0.26% 13.553 13.742 13.696 13.713
2+962.40 13.572 -3.00% 0.08% 13.545 13.734 13.691 13.696
2+963.80 13.564 -3.00% -0.10% 13.537 13.726 13.685 13.679
2+965.20 13.556 -3.00% -0.27% 13.529 13.718 13.680 13.663
2+966.60 13.548 -3.00% -0.45% 13.521 13.710 13.674 13.646
2+968.00 13.540 -3.00% -0.63% 13.513 13.702 13.669 13.629
2+969.40 13.532 -3.00% -0.80% 13.505 13.694 13.663 13.613
2+970.80 13.524 -3.00% -0.98% 13.497 13.686 13.658 13.596
2+972.20 13.516 -3.00% -1.16% 13.489 13.678 13.652 13.579
2+973.60 13.508 -3.00% -1.33% 13.481 13.670 13.647 13.563
2+975.00 13.500 -3.00% -1.51% 13.473 13.662 13.641 13.546
2+976.40 13.492 -3.00% -1.68% 13.465 13.654 13.636 13.529
2+977.80 13.484 -3.00% -1.86% 13.457 13.646 13.630 13.513
2+979.20 13.476 -3.00% -2.04% 13.449 13.638 13.625 13.496
2+980.60 13.468 -3.00% -2.21% 13.441 13.630 13.619 13.480

71 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

2+982.00 13.460 -3.00% -2.39% 13.433 13.622 13.613 13.463


2+983.40 13.452 -3.00% -2.57% 13.425 13.614 13.608 13.446
2+984.80 13.444 -3.00% -2.74% 13.417 13.606 13.602 13.430
2+986.20 13.436 -3.00% -2.92% 13.409 13.598 13.597 13.413
2+987.60 13.428 -3.00% -3.00% 13.401 13.590 13.590 13.401
2+989.00 13.420 -3.00% -3.00% 13.393 13.582 13.582 13.393
2+990.40 13.412 -3.00% -3.00% 13.385 13.574 13.574 13.385
2+991.80 13.404 -3.00% -3.00% 13.377 13.566 13.566 13.377
2+993.20 13.396 -3.00% -3.00% 13.369 13.558 13.558 13.369
2+994.60 13.388 -3.00% -3.00% 13.361 13.550 13.550 13.361
2+996.00 13.380 -3.00% -3.00% 13.353 13.542 13.542 13.353
2+997.40 13.372 -3.00% -3.00% 13.345 13.534 13.534 13.345
2+998.80 13.364 -3.00% -3.00% 13.337 13.526 13.526 13.337
3+000.20 13.356 -3.00% -3.00% 13.329 13.518 13.518 13.329
3+001.60 13.348 -3.00% -3.00% 13.321 13.510 13.510 13.321
3+003.00 13.340 -3.00% -3.00% 13.313 13.502 13.502 13.313
3+004.40 13.332 -3.00% -3.00% 13.305 13.494 13.494 13.305
3+005.80 13.324 -3.00% -3.00% 13.297 13.486 13.486 13.297
3+007.20 13.315 -3.00% -3.00% 13.288 13.477 13.477 13.288
3+008.60 13.307 -3.00% -3.00% 13.280 13.469 13.469 13.280
3+010.00 13.299 -3.00% -3.00% 13.272 13.461 13.461 13.272
3+011.40 13.291 -3.00% -3.00% 13.264 13.453 13.453 13.264
3+012.80 13.283 -3.00% -3.00% 13.256 13.445 13.445 13.256
3+014.20 13.275 -3.00% -3.00% 13.248 13.437 13.437 13.248
3+015.60 13.267 -3.00% -3.00% 13.240 13.429 13.429 13.240
3+017.00 13.259 -3.00% -3.00% 13.232 13.421 13.421 13.232
3+018.40 13.251 -3.00% -3.00% 13.224 13.413 13.413 13.224
3+019.80 13.243 -3.00% -3.00% 13.216 13.405 13.405 13.216
3+021.20 13.235 -3.00% -3.00% 13.208 13.397 13.397 13.208
3+022.60 13.227 -3.00% -3.00% 13.200 13.389 13.389 13.200

72 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+024.00 13.219 -3.00% -3.00% 13.192 13.381 13.381 13.192


3+025.40 13.211 -3.00% -3.00% 13.184 13.373 13.373 13.184
3+026.80 13.203 -3.00% -3.00% 13.176 13.365 13.365 13.176
3+028.20 13.195 -3.00% -3.00% 13.168 13.357 13.357 13.168
3+029.60 13.187 -3.00% -3.00% 13.160 13.349 13.349 13.160
3+031.00 13.179 -3.00% -3.00% 13.152 13.341 13.341 13.152
3+032.40 13.171 -3.00% -3.00% 13.144 13.333 13.333 13.144
3+033.80 13.163 -3.00% -3.00% 13.136 13.325 13.325 13.136
3+035.20 13.155 -3.00% -3.00% 13.128 13.317 13.317 13.128
3+036.60 13.147 -3.00% -3.00% 13.120 13.309 13.309 13.120
3+038.00 13.139 -3.00% -3.00% 13.112 13.301 13.301 13.112
3+039.40 13.131 -3.00% -3.00% 13.104 13.293 13.293 13.104
3+040.80 13.123 -3.00% -3.00% 13.096 13.285 13.285 13.096
3+042.20 13.115 -3.00% -3.00% 13.088 13.277 13.277 13.088
3+043.60 13.107 -3.00% -3.00% 13.080 13.269 13.269 13.080
3+045.00 13.099 -3.00% -3.00% 13.072 13.261 13.261 13.072
3+046.40 13.091 -3.00% -3.00% 13.064 13.253 13.253 13.064
3+047.80 13.083 -3.00% -3.00% 13.056 13.245 13.245 13.056
3+049.20 13.075 -3.00% -3.00% 13.048 13.237 13.237 13.048
3+050.60 13.067 -3.00% -3.00% 13.040 13.229 13.229 13.040
3+052.00 13.059 -3.00% -3.00% 13.032 13.221 13.221 13.032
3+053.40 13.051 -3.00% -3.00% 13.024 13.213 13.213 13.024
3+054.80 13.043 -3.00% -3.00% 13.016 13.205 13.205 13.016
3+056.20 13.035 -3.00% -3.00% 13.008 13.197 13.197 13.008
3+057.60 13.027 -3.00% -3.00% 13.000 13.189 13.189 13.000
3+059.00 13.019 -3.00% -3.00% 12.992 13.181 13.181 12.992
3+060.40 13.011 -3.00% -3.00% 12.984 13.173 13.173 12.984
3+061.80 13.003 -3.00% -3.00% 12.976 13.165 13.165 12.976
3+063.20 12.995 -3.00% -3.00% 12.968 13.157 13.157 12.968
3+064.60 12.987 -3.00% -3.00% 12.960 13.149 13.149 12.960

73 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+066.00 12.979 -3.00% -3.00% 12.952 13.141 13.141 12.952


3+067.40 12.971 -3.00% -3.00% 12.944 13.133 13.133 12.944
3+068.80 12.963 -3.00% -3.00% 12.936 13.125 13.125 12.936
3+070.20 12.955 -3.00% -3.00% 12.928 13.117 13.117 12.928
3+071.60 12.947 -3.00% -3.00% 12.920 13.109 13.109 12.920
3+073.00 12.940 -3.00% -3.00% 12.913 13.102 13.102 12.913
3+074.40 12.932 -3.00% -3.00% 12.905 13.094 13.094 12.905
3+075.80 12.925 -3.00% -3.00% 12.898 13.087 13.087 12.898
3+077.20 12.918 -3.00% -3.00% 12.891 13.080 13.080 12.891
3+078.60 12.910 -3.00% -3.00% 12.883 13.072 13.072 12.883
3+080.00 12.904 -3.00% -3.00% 12.877 13.066 13.066 12.877
3+081.40 12.897 -3.00% -3.00% 12.870 13.059 13.059 12.870
3+082.80 12.890 -3.00% -3.00% 12.863 13.052 13.052 12.863
3+084.20 12.884 -3.00% -3.00% 12.857 13.046 13.046 12.857
3+085.60 12.878 -3.00% -3.00% 12.851 13.040 13.040 12.851
3+087.00 12.872 -3.00% -3.00% 12.845 13.034 13.034 12.845
3+088.40 12.866 -3.00% -3.00% 12.839 13.028 13.028 12.839
3+089.80 12.860 -3.00% -3.00% 12.833 13.022 13.022 12.833
3+091.20 12.854 -3.00% -3.00% 12.827 13.016 13.016 12.827
3+092.60 12.849 -3.00% -3.00% 12.822 13.011 13.011 12.822
3+094.00 12.844 -3.00% -3.00% 12.817 13.006 13.006 12.817
3+095.40 12.839 -3.00% -3.00% 12.812 13.001 13.001 12.812
3+096.80 12.834 -3.00% -3.00% 12.807 12.996 12.996 12.807
3+098.20 12.829 -3.00% -3.00% 12.802 12.991 12.991 12.802
3+099.60 12.825 -3.00% -3.00% 12.798 12.987 12.987 12.798
3+101.00 12.820 -3.00% -3.00% 12.793 12.982 12.982 12.793
3+102.40 12.816 -3.00% -3.00% 12.789 12.978 12.978 12.789
3+103.80 12.812 -3.00% -3.00% 12.785 12.974 12.974 12.785
3+105.20 12.808 -3.00% -3.00% 12.781 12.970 12.970 12.781
3+106.60 12.804 -3.00% -3.00% 12.777 12.966 12.966 12.777

74 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+108.00 12.801 -3.00% -3.00% 12.774 12.963 12.963 12.774


3+109.40 12.797 -3.00% -3.00% 12.770 12.959 12.959 12.770
3+110.80 12.794 -3.00% -3.00% 12.767 12.956 12.956 12.767
3+112.20 12.791 -3.00% -3.00% 12.764 12.953 12.953 12.764
3+113.60 12.788 -3.00% -3.00% 12.761 12.950 12.950 12.761
3+115.00 12.785 -3.00% -3.00% 12.758 12.947 12.947 12.758
3+116.40 12.783 -3.00% -3.00% 12.756 12.945 12.945 12.756
3+117.80 12.781 -3.00% -3.00% 12.754 12.943 12.943 12.754
3+119.20 12.778 -3.00% -3.00% 12.751 12.940 12.940 12.751
3+120.60 12.776 -3.00% -3.00% 12.749 12.938 12.938 12.749
3+122.00 12.774 -3.00% -3.00% 12.747 12.936 12.936 12.747
3+123.40 12.773 -3.00% -3.00% 12.746 12.935 12.935 12.746
3+124.80 12.771 -3.00% -3.00% 12.744 12.933 12.933 12.744
3+126.20 12.770 -3.00% -3.00% 12.743 12.932 12.932 12.743
3+127.60 12.769 -3.00% -3.00% 12.742 12.931 12.931 12.742
3+129.00 12.767 -3.00% -3.00% 12.740 12.929 12.929 12.740
3+130.40 12.767 -3.00% -3.00% 12.740 12.929 12.929 12.740
3+131.80 12.766 -3.00% -3.00% 12.739 12.928 12.928 12.739
3+133.20 12.765 -3.00% -3.00% 12.738 12.927 12.927 12.738
3+134.60 12.765 -3.00% -3.00% 12.738 12.927 12.927 12.738
3+136.00 12.765 -3.00% -3.00% 12.738 12.927 12.927 12.738
3+137.40 12.765 -3.00% -3.00% 12.738 12.927 12.927 12.738
3+138.80 12.765 -3.00% -3.00% 12.738 12.927 12.927 12.738
3+140.20 12.765 -3.00% -3.00% 12.738 12.927 12.927 12.738
3+141.60 12.766 -3.00% -3.00% 12.739 12.928 12.928 12.739
3+143.00 12.766 -3.00% -3.00% 12.739 12.928 12.928 12.739
3+144.40 12.767 -3.00% -3.00% 12.740 12.929 12.929 12.740
3+145.80 12.768 -3.00% -3.00% 12.741 12.930 12.930 12.741
3+147.20 12.769 -3.00% -3.00% 12.742 12.931 12.931 12.742
3+148.60 12.770 -3.00% -3.00% 12.743 12.932 12.932 12.743

75 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+150.00 12.772 -3.00% -3.00% 12.745 12.934 12.934 12.745


3+151.40 12.773 -3.00% -3.00% 12.746 12.935 12.935 12.746
3+152.80 12.775 -3.00% -3.00% 12.748 12.937 12.937 12.748
3+154.20 12.777 -3.00% -3.00% 12.750 12.939 12.939 12.750
3+155.60 12.779 -3.00% -3.00% 12.752 12.941 12.941 12.752
3+157.00 12.782 -3.00% -3.00% 12.755 12.944 12.944 12.755
3+158.40 12.784 -3.00% -3.00% 12.757 12.946 12.946 12.757
3+159.80 12.787 -3.00% -3.00% 12.760 12.949 12.949 12.760
3+161.20 12.789 -3.00% -3.00% 12.762 12.951 12.951 12.762
3+162.60 12.792 -3.00% -3.00% 12.765 12.954 12.954 12.765
3+164.00 12.795 -3.00% -3.00% 12.768 12.957 12.957 12.768
3+165.40 12.799 -3.00% -3.00% 12.772 12.961 12.961 12.772
3+166.80 12.802 -3.00% -3.00% 12.775 12.964 12.964 12.775
3+168.20 12.806 -3.00% -3.00% 12.779 12.968 12.968 12.779
3+169.60 12.810 -3.00% -3.00% 12.783 12.972 12.972 12.783
3+171.00 12.814 -3.00% -3.00% 12.787 12.976 12.976 12.787
3+172.40 12.817 -3.00% -3.00% 12.790 12.979 12.979 12.790
3+173.80 12.821 -3.00% -3.00% 12.794 12.983 12.983 12.794
3+175.20 12.825 -3.00% -3.00% 12.798 12.987 12.987 12.798
3+176.60 12.829 -3.00% -3.00% 12.802 12.991 12.991 12.802
3+178.00 12.833 -3.00% -3.00% 12.806 12.995 12.995 12.806
3+179.40 12.837 -3.00% -3.00% 12.810 12.999 12.999 12.810
3+180.80 12.841 -3.00% -3.00% 12.814 13.003 13.003 12.814
3+182.20 12.845 -3.00% -3.00% 12.818 13.007 13.007 12.818
3+183.60 12.849 -3.00% -3.00% 12.822 13.011 13.011 12.822
3+185.00 12.853 -3.00% -3.00% 12.826 13.015 13.015 12.826
3+186.40 12.857 -3.00% -3.00% 12.830 13.019 13.019 12.830
3+187.80 12.861 -3.00% -3.00% 12.834 13.023 13.023 12.834
3+189.20 12.865 -3.00% -3.00% 12.838 13.027 13.027 12.838
3+190.60 12.868 -3.00% -3.00% 12.841 13.030 13.030 12.841

76 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+192.00 12.872 -3.00% -3.00% 12.845 13.034 13.034 12.845


3+193.40 12.876 -3.00% -3.00% 12.849 13.038 13.038 12.849
3+194.80 12.880 -3.00% -3.00% 12.853 13.042 13.042 12.853
3+196.20 12.884 -3.00% -3.00% 12.857 13.046 13.046 12.857
3+197.60 12.888 -3.00% -3.00% 12.861 13.050 13.050 12.861
3+199.00 12.892 -3.00% -3.00% 12.865 13.054 13.054 12.865
3+200.40 12.896 -3.00% -3.00% 12.869 13.058 13.058 12.869
3+201.80 12.900 -3.00% -3.00% 12.873 13.062 13.062 12.873
3+203.20 12.904 -3.00% -3.00% 12.877 13.066 13.066 12.877
3+204.60 12.908 -3.00% -3.00% 12.881 13.070 13.070 12.881
3+206.00 12.912 -3.00% -3.00% 12.885 13.074 13.074 12.885
3+207.40 12.916 -3.00% -3.00% 12.889 13.078 13.078 12.889
3+208.80 12.919 -3.00% -3.00% 12.892 13.081 13.081 12.892
3+210.20 12.923 -3.00% -3.00% 12.896 13.085 13.085 12.896
3+211.60 12.927 -3.00% -3.00% 12.900 13.089 13.089 12.900
3+213.00 12.931 -3.00% -3.00% 12.904 13.093 13.093 12.904
3+214.40 12.935 -3.00% -3.00% 12.908 13.097 13.097 12.908
3+215.80 12.939 -3.00% -3.00% 12.912 13.101 13.101 12.912
3+217.20 12.943 -3.00% -3.00% 12.916 13.105 13.105 12.916
3+218.60 12.947 -3.00% -3.00% 12.920 13.109 13.109 12.920
3+220.00 12.951 -3.00% -3.00% 12.924 13.113 13.113 12.924
3+221.40 12.955 -3.00% -3.00% 12.928 13.117 13.117 12.928
3+222.80 12.959 -3.00% -3.00% 12.932 13.121 13.121 12.932
3+224.20 12.963 -3.00% -3.00% 12.936 13.125 13.125 12.936
3+225.60 12.966 -3.00% -3.00% 12.939 13.128 13.128 12.939
3+227.00 12.970 -3.00% -3.00% 12.943 13.132 13.132 12.943
3+228.40 12.974 -3.00% -3.00% 12.947 13.136 13.136 12.947
3+229.80 12.978 -3.00% -3.00% 12.951 13.140 13.140 12.951
3+231.20 12.982 -3.00% -3.00% 12.955 13.144 13.144 12.955
3+232.60 12.986 -3.00% -3.00% 12.959 13.148 13.148 12.959

77 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+234.00 12.990 -3.00% -3.00% 12.963 13.152 13.152 12.963


3+235.40 12.994 -3.00% -3.00% 12.967 13.156 13.156 12.967
3+236.80 12.998 -3.00% -3.00% 12.971 13.160 13.160 12.971
3+238.20 13.002 -3.00% -3.00% 12.975 13.164 13.164 12.975
3+239.60 13.006 -3.00% -3.00% 12.979 13.168 13.168 12.979
3+241.00 13.010 -3.00% -3.00% 12.983 13.172 13.172 12.983
3+242.40 13.014 -3.00% -3.00% 12.987 13.176 13.176 12.987
3+243.80 13.017 -3.00% -3.00% 12.990 13.179 13.179 12.990
3+245.20 13.021 -3.00% -3.00% 12.994 13.183 13.183 12.994
3+246.60 13.025 -3.00% -3.00% 12.998 13.187 13.187 12.998
3+248.00 13.029 -3.00% -3.00% 13.002 13.191 13.191 13.002
3+249.40 13.033 -3.00% -3.00% 13.006 13.195 13.195 13.006
3+250.80 13.037 -3.00% -3.00% 13.010 13.199 13.199 13.010
3+252.20 13.041 -3.00% -3.00% 13.014 13.203 13.203 13.014
3+253.60 13.045 -3.00% -3.00% 13.018 13.207 13.207 13.018
3+255.00 13.049 -3.00% -3.00% 13.022 13.211 13.211 13.022
3+256.40 13.053 -3.00% -3.00% 13.026 13.215 13.215 13.026
3+257.80 13.057 -3.00% -3.00% 13.030 13.219 13.219 13.030
3+259.20 13.061 -3.00% -3.00% 13.034 13.223 13.223 13.034
3+260.60 13.064 -3.00% -3.00% 13.037 13.226 13.226 13.037
3+262.00 13.068 -3.00% -3.00% 13.041 13.230 13.230 13.041
3+263.40 13.072 -3.00% -3.00% 13.045 13.234 13.234 13.045
3+264.80 13.076 -3.00% -3.00% 13.049 13.238 13.238 13.049
3+266.20 13.080 -3.00% -3.00% 13.053 13.242 13.242 13.053
3+267.60 13.084 -3.00% -3.00% 13.057 13.246 13.246 13.057
3+269.00 13.088 -3.00% -3.00% 13.061 13.250 13.250 13.061
3+270.40 13.092 -3.00% -3.00% 13.065 13.254 13.254 13.065
3+271.80 13.096 -3.00% -3.00% 13.069 13.258 13.258 13.069
3+273.20 13.100 -3.00% -3.00% 13.073 13.262 13.262 13.073
3+274.60 13.104 -3.00% -3.00% 13.077 13.266 13.266 13.077

78 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+276.00 13.108 -3.00% -3.00% 13.081 13.270 13.270 13.081


3+277.40 13.112 -3.00% -3.00% 13.085 13.274 13.274 13.085
3+278.80 13.115 -3.00% -3.00% 13.088 13.277 13.277 13.088
3+280.20 13.119 -3.00% -3.00% 13.092 13.281 13.281 13.092
3+281.60 13.123 -3.00% -3.00% 13.096 13.285 13.285 13.096
3+283.00 13.127 -3.00% -3.00% 13.100 13.289 13.289 13.100
3+284.40 13.131 -3.00% -3.00% 13.104 13.293 13.293 13.104
3+285.80 13.135 -3.00% -3.00% 13.108 13.297 13.297 13.108
3+287.20 13.139 -3.00% -3.00% 13.112 13.301 13.301 13.112
3+288.60 13.143 -3.00% -3.00% 13.116 13.305 13.305 13.116
3+290.00 13.147 -3.00% -3.00% 13.120 13.309 13.309 13.120
3+291.40 13.151 -3.00% -3.00% 13.124 13.313 13.313 13.124
3+292.80 13.155 -3.00% -3.00% 13.128 13.317 13.317 13.128
3+294.20 13.159 -3.00% -3.00% 13.132 13.321 13.321 13.132
3+295.60 13.162 -3.00% -3.00% 13.135 13.324 13.324 13.135
3+297.00 13.166 -3.00% -3.00% 13.139 13.328 13.328 13.139
3+298.40 13.170 -3.00% -3.00% 13.143 13.332 13.332 13.143
3+299.80 13.174 -3.00% -3.00% 13.147 13.336 13.336 13.147
3+301.20 13.178 -3.00% -3.00% 13.151 13.340 13.340 13.151
3+302.60 13.182 -3.00% -3.00% 13.155 13.344 13.344 13.155
3+304.00 13.186 -3.00% -3.00% 13.159 13.348 13.348 13.159
3+305.40 13.190 -3.00% -3.00% 13.163 13.352 13.352 13.163
3+306.80 13.194 -3.00% -3.00% 13.167 13.356 13.356 13.167
3+308.20 13.198 -3.00% -3.00% 13.171 13.360 13.360 13.171
3+309.60 13.202 -3.00% -3.00% 13.175 13.364 13.364 13.175
3+311.00 13.206 -3.00% -3.00% 13.179 13.368 13.368 13.179
3+312.40 13.210 -3.00% -3.00% 13.183 13.372 13.372 13.183
3+313.80 13.213 -3.00% -3.00% 13.186 13.375 13.375 13.186
3+315.20 13.217 -3.00% -3.00% 13.190 13.379 13.379 13.190
3+316.60 13.221 -3.00% -3.00% 13.194 13.383 13.383 13.194

79 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+318.00 13.225 -3.00% -3.00% 13.198 13.387 13.387 13.198


3+319.40 13.229 -3.00% -3.00% 13.202 13.391 13.391 13.202
3+320.80 13.233 -3.00% -3.00% 13.206 13.395 13.395 13.206
3+322.20 13.237 -3.00% -3.00% 13.210 13.399 13.399 13.210
3+323.60 13.241 -3.00% -3.00% 13.214 13.403 13.403 13.214
3+325.00 13.245 -3.00% -3.00% 13.218 13.407 13.407 13.218
3+326.40 13.249 -3.00% -3.00% 13.222 13.411 13.411 13.222
3+327.80 13.253 -3.00% -3.00% 13.226 13.415 13.415 13.226
3+329.20 13.257 -3.00% -3.00% 13.230 13.419 13.419 13.230
3+330.60 13.260 -3.00% -3.00% 13.233 13.422 13.422 13.233
3+332.00 13.264 -3.00% -3.00% 13.237 13.426 13.426 13.237
3+333.40 13.268 -3.00% -3.00% 13.241 13.430 13.430 13.241
3+334.80 13.272 -3.00% -3.00% 13.245 13.434 13.434 13.245
3+336.20 13.276 -3.00% -3.00% 13.249 13.438 13.438 13.249
3+337.60 13.280 -3.00% -3.00% 13.253 13.442 13.442 13.253
3+339.00 13.284 -3.00% -3.00% 13.257 13.446 13.446 13.257
3+340.40 13.288 -3.00% -3.00% 13.261 13.450 13.450 13.261
3+341.80 13.292 -3.00% -3.00% 13.265 13.454 13.454 13.265
3+343.20 13.296 -3.00% -3.00% 13.269 13.458 13.458 13.269
3+344.60 13.300 -3.00% -3.00% 13.273 13.462 13.462 13.273
3+346.00 13.304 -3.00% -3.00% 13.277 13.466 13.466 13.277
3+347.40 13.308 -3.00% -3.00% 13.281 13.470 13.470 13.281
3+348.80 13.311 -3.00% -3.00% 13.284 13.473 13.473 13.284
3+350.20 13.315 -3.00% -3.00% 13.288 13.477 13.477 13.288
3+351.60 13.319 -3.00% -3.00% 13.292 13.481 13.481 13.292
3+353.00 13.323 -3.00% -3.00% 13.296 13.485 13.485 13.296
3+354.40 13.327 -3.00% -3.00% 13.300 13.489 13.489 13.300
3+355.80 13.331 -3.00% -3.00% 13.304 13.493 13.493 13.304
3+357.20 13.335 -3.00% -3.00% 13.308 13.497 13.497 13.308
3+358.60 13.339 -3.00% -3.00% 13.312 13.501 13.501 13.312

80 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+360.00 13.343 -3.00% -3.00% 13.316 13.505 13.505 13.316


3+361.40 13.347 -3.00% -3.00% 13.320 13.509 13.509 13.320
3+362.80 13.351 -3.00% -3.00% 13.324 13.513 13.513 13.324
3+364.20 13.355 -3.00% -3.00% 13.328 13.517 13.517 13.328
3+365.60 13.358 -3.00% -3.00% 13.331 13.520 13.520 13.331
3+367.00 13.362 -3.00% -3.00% 13.335 13.524 13.524 13.335
3+368.40 13.366 -3.00% -3.00% 13.339 13.528 13.528 13.339
3+369.80 13.370 -3.00% -3.00% 13.343 13.532 13.532 13.343
3+371.20 13.374 -3.00% -3.00% 13.347 13.536 13.536 13.347
3+372.60 13.378 -3.00% -3.00% 13.351 13.540 13.540 13.351
3+374.00 13.382 -3.00% -3.00% 13.355 13.544 13.544 13.355
3+375.40 13.386 -3.00% -3.00% 13.359 13.548 13.548 13.359
3+376.80 13.390 -3.00% -3.00% 13.363 13.552 13.552 13.363
3+378.20 13.394 -3.00% -3.00% 13.367 13.556 13.556 13.367
3+379.60 13.398 -3.00% -3.00% 13.371 13.560 13.560 13.371
3+381.00 13.402 -3.00% -3.00% 13.375 13.564 13.564 13.375
3+382.40 13.406 -3.00% -3.00% 13.379 13.568 13.568 13.379
3+383.80 13.409 -3.00% -3.00% 13.382 13.571 13.571 13.382
3+385.20 13.413 -3.00% -3.00% 13.386 13.575 13.575 13.386
3+386.60 13.417 -3.00% -3.00% 13.390 13.579 13.579 13.390
3+388.00 13.421 -3.00% -3.00% 13.394 13.583 13.583 13.394
3+389.40 13.425 -3.00% -3.00% 13.398 13.587 13.587 13.398
3+390.80 13.429 -3.00% -3.00% 13.402 13.591 13.591 13.402
3+392.20 13.433 -3.00% -3.00% 13.406 13.595 13.595 13.406
3+393.60 13.437 -3.00% -3.00% 13.410 13.599 13.599 13.410
3+395.00 13.441 -3.00% -3.00% 13.414 13.603 13.603 13.414
3+396.40 13.445 -3.00% -3.00% 13.418 13.607 13.607 13.418
3+397.80 13.449 -3.00% -3.00% 13.422 13.611 13.611 13.422
3+399.20 13.453 -3.00% -3.00% 13.426 13.615 13.615 13.426
3+400.60 13.457 -3.00% -3.00% 13.430 13.619 13.619 13.430

81 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+402.00 13.460 -3.00% -3.00% 13.433 13.622 13.622 13.433


3+403.40 13.464 -3.00% -3.00% 13.437 13.626 13.626 13.437
3+404.80 13.468 -3.00% -3.00% 13.441 13.630 13.630 13.441
3+406.20 13.472 -3.00% -3.00% 13.445 13.634 13.634 13.445
3+407.60 13.476 -3.00% -3.00% 13.449 13.638 13.638 13.449
3+409.00 13.480 -3.00% -3.00% 13.453 13.642 13.642 13.453
3+410.40 13.484 -3.00% -3.00% 13.457 13.646 13.646 13.457
3+411.80 13.488 -3.00% -3.00% 13.461 13.650 13.650 13.461
3+413.20 13.492 -3.00% -3.00% 13.465 13.654 13.654 13.465
3+414.60 13.496 -3.00% -3.00% 13.469 13.658 13.658 13.469
3+416.00 13.500 -3.00% -3.00% 13.473 13.662 13.662 13.473
3+417.40 13.504 -3.00% -3.00% 13.477 13.666 13.666 13.477
3+418.80 13.507 -3.00% -3.00% 13.480 13.669 13.669 13.480
3+420.20 13.511 -3.00% -3.00% 13.484 13.673 13.673 13.484
3+421.60 13.515 -3.00% -3.00% 13.488 13.677 13.677 13.488
3+423.00 13.519 -3.00% -3.00% 13.492 13.681 13.681 13.492
3+424.40 13.523 -3.00% -3.00% 13.496 13.685 13.685 13.496
3+425.80 13.527 -3.00% -3.00% 13.500 13.689 13.689 13.500
3+427.20 13.531 -3.00% -3.00% 13.504 13.693 13.693 13.504
3+428.60 13.535 -3.00% -3.00% 13.508 13.697 13.697 13.508
3+430.00 13.539 -3.00% -3.00% 13.512 13.701 13.701 13.512
3+431.40 13.543 -3.00% -3.00% 13.516 13.705 13.705 13.516
3+432.80 13.547 -3.00% -3.00% 13.520 13.709 13.709 13.520
3+434.20 13.551 -3.00% -3.00% 13.524 13.713 13.713 13.524
3+435.60 13.555 -3.00% -3.00% 13.528 13.717 13.717 13.528
3+437.00 13.558 -3.00% -3.00% 13.531 13.720 13.720 13.531
3+438.40 13.562 -3.00% -3.00% 13.535 13.724 13.724 13.535
3+439.80 13.566 -3.00% -3.00% 13.539 13.728 13.728 13.539
3+441.20 13.570 -3.00% -3.00% 13.543 13.732 13.732 13.543
3+442.60 13.574 -3.00% -3.00% 13.547 13.736 13.736 13.547

82 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+444.00 13.578 -3.00% -3.00% 13.551 13.740 13.740 13.551


3+445.40 13.582 -3.00% -3.00% 13.555 13.744 13.744 13.555
3+446.80 13.586 -3.00% -3.00% 13.559 13.748 13.748 13.559
3+448.20 13.590 -3.00% -3.00% 13.563 13.752 13.752 13.563
3+449.60 13.594 -3.00% -3.00% 13.567 13.756 13.756 13.567
3+451.00 13.598 -3.00% -3.00% 13.571 13.760 13.760 13.571
3+452.40 13.602 -3.00% -3.00% 13.575 13.764 13.764 13.575
3+453.80 13.605 -3.00% -3.00% 13.578 13.767 13.767 13.578
3+455.20 13.609 -3.00% -3.00% 13.582 13.771 13.771 13.582
3+456.60 13.613 -3.00% -3.00% 13.586 13.775 13.775 13.586
3+458.00 13.617 -3.00% -3.00% 13.590 13.779 13.779 13.590
3+459.40 13.621 -3.00% -3.00% 13.594 13.783 13.783 13.594
3+460.80 13.625 -3.00% -3.00% 13.598 13.787 13.787 13.598
3+462.20 13.629 -3.00% -3.00% 13.602 13.791 13.791 13.602
3+463.60 13.633 -3.00% -3.00% 13.606 13.795 13.795 13.606
3+465.00 13.637 -3.00% -3.00% 13.610 13.799 13.799 13.610
3+466.40 13.641 -3.00% -3.00% 13.614 13.803 13.803 13.614
3+467.80 13.645 -3.00% -3.00% 13.618 13.807 13.807 13.618
3+469.20 13.649 -3.00% -3.00% 13.622 13.811 13.811 13.622
3+470.60 13.653 -3.00% -3.00% 13.626 13.815 13.815 13.626
3+472.00 13.656 -3.00% -3.00% 13.629 13.818 13.818 13.629
3+473.40 13.660 -3.00% -3.00% 13.633 13.822 13.822 13.633
3+474.80 13.664 -3.00% -3.00% 13.637 13.826 13.826 13.637
3+476.20 13.668 -3.00% -3.00% 13.641 13.830 13.830 13.641
3+477.60 13.672 -3.00% -3.00% 13.645 13.834 13.834 13.645
3+479.00 13.676 -3.00% -3.00% 13.649 13.838 13.838 13.649
3+480.40 13.680 -3.00% -3.00% 13.653 13.842 13.842 13.653
3+481.80 13.684 -3.00% -3.00% 13.657 13.846 13.846 13.657
3+483.20 13.688 -3.00% -3.00% 13.661 13.850 13.850 13.661
3+484.60 13.692 -3.00% -3.00% 13.665 13.854 13.854 13.665

83 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+486.00 13.696 -3.00% -3.00% 13.669 13.858 13.858 13.669


3+487.40 13.700 -3.00% -3.00% 13.673 13.862 13.862 13.673
3+488.80 13.703 -3.00% -3.00% 13.676 13.865 13.865 13.676
3+490.20 13.707 -3.00% -3.00% 13.680 13.869 13.869 13.680
3+491.60 13.711 -3.00% -3.00% 13.684 13.873 13.873 13.684
3+493.00 13.715 -3.00% -3.00% 13.688 13.877 13.877 13.688
3+494.40 13.719 -3.00% -3.00% 13.692 13.881 13.881 13.692
3+495.80 13.723 -3.00% -3.00% 13.696 13.885 13.885 13.696
3+497.20 13.727 -3.00% -3.00% 13.700 13.889 13.889 13.700
3+498.60 13.731 -3.00% -3.00% 13.704 13.893 13.893 13.704
3+500.00 13.735 -3.00% -3.00% 13.708 13.897 13.897 13.708
3+501.40 13.739 -3.00% -3.00% 13.712 13.901 13.901 13.712
3+502.80 13.743 -3.00% -3.00% 13.716 13.905 13.905 13.716
3+504.20 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
3+505.60 13.751 -3.00% -3.00% 13.724 13.913 13.913 13.724
3+507.00 13.754 -3.00% -3.00% 13.727 13.916 13.916 13.727
3+508.40 13.758 -3.00% -3.00% 13.731 13.920 13.920 13.731
3+509.80 13.762 -3.00% -3.00% 13.735 13.924 13.924 13.735
3+511.20 13.766 -3.00% -3.00% 13.739 13.928 13.928 13.739
3+512.60 13.770 -3.00% -3.00% 13.743 13.932 13.932 13.743
3+514.00 13.774 -3.00% -3.00% 13.747 13.936 13.936 13.747
3+515.40 13.778 -3.00% -3.00% 13.751 13.940 13.940 13.751
3+516.80 13.782 -3.00% -3.00% 13.755 13.944 13.944 13.755
3+518.20 13.786 -3.00% -3.00% 13.759 13.948 13.948 13.759
3+519.60 13.790 -3.00% -3.00% 13.763 13.952 13.952 13.763
3+521.00 13.794 -3.00% -3.00% 13.767 13.956 13.956 13.767
3+522.40 13.798 -3.00% -3.00% 13.771 13.960 13.960 13.771
3+523.80 13.801 -3.00% -3.00% 13.774 13.963 13.963 13.774
3+525.20 13.805 -3.00% -3.00% 13.778 13.967 13.967 13.778
3+526.60 13.809 -3.00% -3.00% 13.782 13.971 13.971 13.782

84 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+528.00 13.813 -3.00% -3.00% 13.786 13.975 13.975 13.786


3+529.40 13.817 -3.00% -3.00% 13.790 13.979 13.979 13.790
3+530.80 13.821 -3.00% -3.00% 13.794 13.983 13.983 13.794
3+532.20 13.825 -3.00% -3.00% 13.798 13.987 13.987 13.798
3+533.60 13.828 -3.00% -3.00% 13.801 13.990 13.990 13.801
3+535.00 13.832 -3.00% -3.00% 13.805 13.994 13.994 13.805
3+536.40 13.835 -3.00% -3.00% 13.808 13.997 13.997 13.808
3+537.80 13.838 -3.00% -3.00% 13.811 14.000 14.000 13.811
3+539.20 13.841 -3.00% -3.00% 13.814 14.003 14.003 13.814
3+540.60 13.844 -3.00% -3.00% 13.817 14.006 14.006 13.817
3+542.00 13.847 -3.00% -3.00% 13.820 14.009 14.009 13.820
3+543.40 13.849 -3.00% -3.00% 13.822 14.011 14.011 13.822
3+544.80 13.852 -3.00% -3.00% 13.825 14.014 14.014 13.825
3+546.20 13.854 -3.00% -3.00% 13.827 14.016 14.016 13.827
3+547.60 13.856 -3.00% -3.00% 13.829 14.018 14.018 13.829
3+549.00 13.858 -3.00% -3.00% 13.831 14.020 14.020 13.831
3+550.40 13.860 -3.00% -3.00% 13.833 14.022 14.022 13.833
3+551.80 13.861 -3.00% -3.00% 13.834 14.023 14.023 13.834
3+553.20 13.863 -3.00% -3.00% 13.836 14.025 14.025 13.836
3+554.60 13.864 -3.00% -3.00% 13.837 14.026 14.026 13.837
3+556.00 13.865 -3.00% -3.00% 13.838 14.027 14.027 13.838
3+557.40 13.866 -3.00% -3.00% 13.839 14.028 14.028 13.839
3+558.80 13.867 -3.00% -3.00% 13.840 14.029 14.029 13.840
3+560.20 13.868 -3.00% -3.00% 13.841 14.030 14.030 13.841
3+561.60 13.868 -3.00% -3.00% 13.841 14.030 14.030 13.841
3+563.00 13.869 -3.00% -3.00% 13.842 14.031 14.031 13.842
3+564.40 13.869 -3.00% -3.00% 13.842 14.031 14.031 13.842
3+565.80 13.869 -3.00% -3.00% 13.842 14.031 14.031 13.842
3+567.20 13.869 -3.00% -3.00% 13.842 14.031 14.031 13.842
3+568.60 13.869 -3.00% -3.00% 13.842 14.031 14.031 13.842

85 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+570.00 13.868 -3.00% -3.00% 13.841 14.030 14.030 13.841


3+571.40 13.868 -3.00% -3.00% 13.841 14.030 14.030 13.841
3+572.80 13.867 -3.00% -3.00% 13.840 14.029 14.029 13.840
3+574.20 13.866 -3.00% -3.00% 13.839 14.028 14.028 13.839
3+575.60 13.865 -3.00% -3.00% 13.838 14.027 14.027 13.838
3+577.00 13.864 -3.00% -3.00% 13.837 14.026 14.026 13.837
3+578.40 13.863 -3.00% -3.00% 13.836 14.025 14.025 13.836
3+579.80 13.861 -3.00% -3.00% 13.834 14.023 14.023 13.834
3+581.20 13.860 -3.00% -3.00% 13.833 14.022 14.022 13.833
3+582.60 13.858 -3.00% -3.00% 13.831 14.020 14.020 13.831
3+584.00 13.856 -3.00% -3.00% 13.829 14.018 14.018 13.829
3+585.40 13.854 -3.00% -3.00% 13.827 14.016 14.016 13.827
3+586.80 13.852 -3.00% -3.00% 13.825 14.014 14.014 13.825
3+588.20 13.849 -3.00% -3.00% 13.822 14.011 14.011 13.822
3+589.60 13.847 -3.00% -3.00% 13.820 14.009 14.009 13.820
3+591.00 13.844 -3.00% -3.00% 13.817 14.006 14.006 13.817
3+592.40 13.841 -3.00% -3.00% 13.814 14.003 14.003 13.814
3+593.80 13.838 -3.00% -3.00% 13.811 14.000 14.000 13.811
3+595.20 13.835 -3.00% -3.00% 13.808 13.997 13.997 13.808
3+596.60 13.832 -3.00% -3.00% 13.805 13.994 13.994 13.805
3+598.00 13.829 -3.00% -3.00% 13.802 13.991 13.991 13.802
3+599.40 13.825 -3.00% -3.00% 13.798 13.987 13.987 13.798
3+600.80 13.821 -3.00% -3.00% 13.794 13.983 13.983 13.794
3+602.20 13.817 -3.00% -3.00% 13.790 13.979 13.979 13.790
3+603.60 13.813 -3.00% -3.00% 13.786 13.975 13.975 13.786
3+605.00 13.809 -3.00% -3.00% 13.782 13.971 13.971 13.782
3+606.40 13.805 -3.00% -3.00% 13.778 13.967 13.967 13.778
3+607.80 13.800 -3.00% -3.00% 13.773 13.962 13.962 13.773
3+609.20 13.796 -3.00% -3.00% 13.769 13.958 13.958 13.769
3+610.60 13.791 -3.00% -3.00% 13.764 13.953 13.953 13.764

86 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+612.00 13.786 -3.00% -3.00% 13.759 13.948 13.948 13.759


3+613.40 13.781 -3.00% -3.00% 13.754 13.943 13.943 13.754
3+614.80 13.775 -3.00% -3.00% 13.748 13.937 13.937 13.748
3+616.20 13.770 -3.00% -3.00% 13.743 13.932 13.932 13.743
3+617.60 13.764 -3.00% -3.00% 13.737 13.926 13.926 13.737
3+619.00 13.759 -3.00% -3.00% 13.732 13.921 13.921 13.732
3+620.40 13.753 -3.00% -3.00% 13.726 13.915 13.915 13.726
3+621.80 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
3+623.20 13.741 -3.00% -3.00% 13.714 13.903 13.903 13.714
3+624.60 13.734 -3.00% -3.00% 13.707 13.896 13.896 13.707
3+626.00 13.728 -3.00% -3.00% 13.701 13.890 13.890 13.701
3+627.40 13.721 -3.00% -3.00% 13.694 13.883 13.883 13.694
3+628.80 13.714 -3.00% -3.00% 13.687 13.876 13.876 13.687
3+630.20 13.707 -3.00% -3.00% 13.680 13.869 13.869 13.680
3+631.60 13.700 -3.00% -3.00% 13.673 13.862 13.862 13.673
3+633.00 13.693 -3.00% -3.00% 13.666 13.855 13.855 13.666
3+634.40 13.686 -3.00% -3.00% 13.659 13.848 13.848 13.659
3+635.80 13.679 -3.00% -3.00% 13.652 13.841 13.841 13.652
3+637.20 13.672 -3.00% -3.00% 13.645 13.834 13.834 13.645
3+638.60 13.665 -3.00% -3.00% 13.638 13.827 13.827 13.638
3+640.00 13.658 -3.00% -3.00% 13.631 13.820 13.820 13.631
3+641.40 13.651 -3.00% -3.00% 13.624 13.813 13.813 13.624
3+642.80 13.644 -3.00% -3.00% 13.617 13.806 13.806 13.617
3+644.20 13.637 -3.00% -3.00% 13.610 13.799 13.799 13.610
3+645.60 13.630 -3.00% -3.00% 13.603 13.792 13.792 13.603
3+647.00 13.623 -3.00% -3.00% 13.596 13.785 13.785 13.596
3+648.40 13.616 -3.00% -3.00% 13.589 13.778 13.778 13.589
3+649.80 13.609 -3.00% -3.00% 13.582 13.771 13.771 13.582
3+651.20 13.602 -3.00% -3.00% 13.575 13.764 13.764 13.575
3+652.60 13.595 -3.00% -3.00% 13.568 13.757 13.757 13.568

87 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+654.00 13.588 -3.00% -3.00% 13.561 13.750 13.750 13.561


3+655.40 13.581 -3.00% -3.00% 13.554 13.743 13.743 13.554
3+656.80 13.574 -3.00% -3.00% 13.547 13.736 13.736 13.547
3+658.20 13.567 -3.00% -3.00% 13.540 13.729 13.729 13.540
3+659.60 13.560 -3.00% -3.00% 13.533 13.722 13.722 13.533
3+661.00 13.553 -3.00% -3.00% 13.526 13.715 13.715 13.526
3+662.40 13.546 -3.00% -3.00% 13.519 13.708 13.708 13.519
3+663.80 13.539 -3.00% -3.00% 13.512 13.701 13.701 13.512
3+665.20 13.532 -3.00% -3.00% 13.505 13.694 13.694 13.505
3+666.60 13.525 -3.00% -3.00% 13.498 13.687 13.687 13.498
3+668.00 13.518 -3.00% -3.00% 13.491 13.680 13.680 13.491
3+669.40 13.511 -3.00% -3.00% 13.484 13.673 13.673 13.484
3+670.80 13.504 -3.00% -3.00% 13.477 13.666 13.666 13.477
3+672.20 13.497 -3.00% -3.00% 13.470 13.659 13.659 13.470
3+673.60 13.490 -3.00% -3.00% 13.463 13.652 13.652 13.463
3+675.00 13.483 -3.00% -3.00% 13.456 13.645 13.645 13.456
3+676.40 13.476 -3.00% -3.00% 13.449 13.638 13.638 13.449
3+677.80 13.469 -3.00% -3.00% 13.442 13.631 13.631 13.442
3+679.20 13.462 -3.00% -3.00% 13.435 13.624 13.624 13.435
3+680.60 13.455 -3.00% -3.00% 13.428 13.617 13.617 13.428
3+682.00 13.448 -3.00% -3.00% 13.421 13.610 13.610 13.421
3+683.40 13.441 -3.00% -3.00% 13.414 13.603 13.603 13.414
3+684.80 13.434 -3.00% -3.00% 13.407 13.596 13.596 13.407
3+686.20 13.427 -3.00% -3.00% 13.400 13.589 13.589 13.400
3+687.60 13.420 -3.00% -3.00% 13.393 13.582 13.582 13.393
3+689.00 13.413 -3.00% -3.00% 13.386 13.575 13.575 13.386
3+690.40 13.406 -3.00% -3.00% 13.379 13.568 13.568 13.379
3+691.80 13.399 -3.00% -3.00% 13.372 13.561 13.561 13.372
3+693.20 13.392 -3.00% -3.00% 13.365 13.554 13.554 13.365
3+694.60 13.385 -3.00% -3.00% 13.358 13.547 13.547 13.358

88 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+696.00 13.378 -3.00% -3.00% 13.351 13.540 13.540 13.351


3+697.40 13.371 -3.00% -3.00% 13.344 13.533 13.533 13.344
3+698.80 13.364 -3.00% -3.00% 13.337 13.526 13.526 13.337
3+700.20 13.357 -3.00% -3.00% 13.330 13.519 13.519 13.330
3+701.60 13.350 -3.00% -3.00% 13.323 13.512 13.512 13.323
3+703.00 13.343 -3.00% -3.00% 13.316 13.505 13.505 13.316
3+704.40 13.336 -3.00% -3.00% 13.309 13.498 13.498 13.309
3+705.80 13.329 -3.00% -3.00% 13.302 13.491 13.491 13.302
3+707.20 13.322 -3.00% -3.00% 13.295 13.484 13.484 13.295
3+708.60 13.315 -3.00% -3.00% 13.288 13.477 13.477 13.288
3+710.00 13.308 -3.00% -3.00% 13.281 13.470 13.470 13.281
3+711.40 13.301 -3.00% -3.00% 13.274 13.463 13.463 13.274
3+712.80 13.294 -3.00% -3.00% 13.267 13.456 13.456 13.267
3+714.20 13.287 -3.00% -3.00% 13.260 13.449 13.449 13.260
3+715.60 13.280 -3.00% -3.00% 13.253 13.442 13.442 13.253
3+717.00 13.273 -3.00% -3.00% 13.246 13.435 13.435 13.246
3+718.40 13.266 -3.00% -3.00% 13.239 13.428 13.428 13.239
3+719.80 13.259 -3.00% -3.00% 13.232 13.421 13.421 13.232
3+721.20 13.252 -3.00% -3.00% 13.225 13.414 13.414 13.225
3+722.60 13.245 -3.00% -3.00% 13.218 13.407 13.407 13.218
3+724.00 13.238 -3.00% -3.00% 13.211 13.400 13.400 13.211
3+725.40 13.230 -3.00% -3.00% 13.203 13.392 13.392 13.203
3+726.80 13.223 -3.00% -3.00% 13.196 13.385 13.385 13.196
3+728.20 13.216 -3.00% -3.00% 13.189 13.378 13.378 13.189
3+729.60 13.209 -3.00% -3.00% 13.182 13.371 13.371 13.182
3+731.00 13.202 -3.00% -3.00% 13.175 13.364 13.364 13.175
3+732.40 13.195 -3.00% -3.00% 13.168 13.357 13.357 13.168
3+733.80 13.188 -3.00% -3.00% 13.161 13.350 13.350 13.161
3+735.20 13.181 -3.00% -3.00% 13.154 13.343 13.343 13.154
3+736.60 13.174 -3.00% -3.00% 13.147 13.336 13.336 13.147

89 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+738.00 13.167 -3.00% -3.00% 13.140 13.329 13.329 13.140


3+739.40 13.160 -3.00% -3.00% 13.133 13.322 13.322 13.133
3+740.80 13.153 -3.00% -3.00% 13.126 13.315 13.315 13.126
3+742.20 13.146 -3.00% -3.00% 13.119 13.308 13.308 13.119
3+743.60 13.139 -3.00% -3.00% 13.112 13.301 13.301 13.112
3+745.00 13.132 -3.00% -3.00% 13.105 13.294 13.294 13.105
3+746.40 13.125 -3.00% -3.00% 13.098 13.287 13.287 13.098
3+747.80 13.118 -3.00% -3.00% 13.091 13.280 13.280 13.091
3+749.20 13.111 -3.00% -3.00% 13.084 13.273 13.273 13.084
3+750.60 13.104 -3.00% -3.00% 13.077 13.266 13.266 13.077
3+752.00 13.097 -3.00% -3.00% 13.070 13.259 13.259 13.070
3+753.40 13.090 -3.00% -3.00% 13.063 13.252 13.252 13.063
3+754.80 13.083 -3.00% -3.00% 13.056 13.245 13.245 13.056
3+756.20 13.076 -3.00% -3.00% 13.049 13.238 13.238 13.049
3+757.60 13.069 -3.00% -3.00% 13.042 13.231 13.231 13.042
3+759.00 13.062 -3.00% -3.00% 13.035 13.224 13.224 13.035
3+760.40 13.055 -3.00% -3.00% 13.028 13.217 13.217 13.028
3+761.80 13.048 -3.00% -3.00% 13.021 13.210 13.210 13.021
3+763.20 13.041 -3.00% -3.00% 13.014 13.203 13.203 13.014
3+764.60 13.034 -3.00% -3.00% 13.007 13.196 13.196 13.007
3+766.00 13.027 -3.00% -3.00% 13.000 13.189 13.189 13.000
3+767.40 13.020 -3.00% -3.00% 12.993 13.182 13.182 12.993
3+768.80 13.013 -3.00% -3.00% 12.986 13.175 13.175 12.986
3+770.20 13.006 -3.00% -3.00% 12.979 13.168 13.168 12.979
3+771.60 12.999 -3.00% -3.00% 12.972 13.161 13.161 12.972
3+773.00 12.992 -3.00% -3.00% 12.965 13.154 13.154 12.965
3+774.40 12.985 -3.00% -3.00% 12.958 13.147 13.147 12.958
3+775.80 12.978 -3.00% -3.00% 12.951 13.140 13.140 12.951
3+777.20 12.971 -3.00% -3.00% 12.944 13.133 13.133 12.944
3+778.60 12.964 -3.00% -3.00% 12.937 13.126 13.126 12.937

90 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+780.00 12.957 -3.00% -3.00% 12.930 13.119 13.119 12.930


3+781.40 12.950 -3.00% -3.00% 12.923 13.112 13.112 12.923
3+782.80 12.943 -3.00% -3.00% 12.916 13.105 13.105 12.916
3+784.20 12.936 -3.00% -3.00% 12.909 13.098 13.098 12.909
3+785.60 12.929 -3.00% -3.00% 12.902 13.091 13.091 12.902
3+787.00 12.922 -3.00% -3.00% 12.895 13.084 13.084 12.895
3+788.40 12.915 -3.00% -3.00% 12.888 13.077 13.077 12.888
3+789.80 12.908 -3.00% -3.00% 12.881 13.070 13.070 12.881
3+791.20 12.901 -3.00% -3.00% 12.874 13.063 13.063 12.874
3+792.60 12.894 -3.00% -3.00% 12.867 13.056 13.056 12.867
3+794.00 12.887 -3.00% -3.00% 12.860 13.049 13.049 12.860
3+795.40 12.880 -3.00% -3.00% 12.853 13.042 13.042 12.853
3+796.80 12.873 -3.00% -3.00% 12.846 13.035 13.035 12.846
3+798.20 12.866 -3.00% -3.00% 12.839 13.028 13.028 12.839
3+799.60 12.859 -3.00% -3.00% 12.832 13.021 13.021 12.832
3+801.00 12.852 -3.00% -3.00% 12.825 13.014 13.014 12.825
3+802.40 12.845 -3.00% -3.00% 12.818 13.007 13.007 12.818
3+803.80 12.838 -3.00% -3.00% 12.811 13.000 13.000 12.811
3+805.20 12.831 -3.00% -3.00% 12.804 12.993 12.993 12.804
3+806.60 12.824 -3.00% -3.00% 12.797 12.986 12.986 12.797
3+808.00 12.817 -3.00% -3.00% 12.790 12.979 12.979 12.790
3+809.40 12.810 -3.00% -3.00% 12.783 12.972 12.972 12.783
3+810.80 12.803 -3.00% -3.00% 12.776 12.965 12.965 12.776
3+812.20 12.796 -3.00% -3.00% 12.769 12.958 12.958 12.769
3+813.60 12.789 -3.00% -3.00% 12.762 12.951 12.951 12.762
3+815.00 12.782 -3.00% -3.00% 12.755 12.944 12.944 12.755
3+816.40 12.775 -3.00% -3.00% 12.748 12.937 12.937 12.748
3+817.80 12.768 -3.00% -3.00% 12.741 12.930 12.930 12.741
3+819.20 12.761 -3.00% -3.00% 12.734 12.923 12.923 12.734
3+820.60 12.754 -3.00% -3.00% 12.727 12.916 12.916 12.727

91 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+822.00 12.747 -3.00% -3.00% 12.720 12.909 12.909 12.720


3+823.40 12.740 -3.00% -3.00% 12.713 12.902 12.902 12.713
3+824.80 12.733 -3.00% -3.00% 12.706 12.895 12.895 12.706
3+826.20 12.726 -3.00% -3.00% 12.699 12.888 12.888 12.699
3+827.60 12.719 -3.00% -3.00% 12.692 12.881 12.881 12.692
3+829.00 12.712 -3.00% -3.00% 12.685 12.874 12.874 12.685
3+830.40 12.706 -3.00% -3.00% 12.679 12.868 12.868 12.679
3+831.80 12.699 -3.00% -3.00% 12.672 12.861 12.861 12.672
3+833.20 12.693 -3.00% -3.00% 12.666 12.855 12.855 12.666
3+834.60 12.687 -3.00% -3.00% 12.660 12.849 12.849 12.660
3+836.00 12.681 -3.00% -3.00% 12.654 12.843 12.843 12.654
3+837.40 12.675 -3.00% -3.00% 12.648 12.837 12.837 12.648
3+838.80 12.670 -3.00% -3.00% 12.643 12.832 12.832 12.643
3+840.20 12.664 -3.00% -3.00% 12.637 12.826 12.826 12.637
3+841.60 12.659 -3.00% -3.00% 12.632 12.821 12.821 12.632
3+843.00 12.654 -3.00% -3.00% 12.627 12.816 12.816 12.627
3+844.40 12.648 -3.00% -3.00% 12.621 12.810 12.810 12.621
3+845.80 12.644 -3.00% -3.00% 12.617 12.806 12.806 12.617
3+847.20 12.639 -3.00% -3.00% 12.612 12.801 12.801 12.612
3+848.60 12.634 -3.00% -3.00% 12.607 12.796 12.796 12.607
3+850.00 12.630 -3.00% -3.00% 12.603 12.792 12.792 12.603
3+851.40 12.626 -3.00% -3.00% 12.599 12.788 12.788 12.599
3+852.80 12.621 -3.00% -3.00% 12.594 12.783 12.783 12.594
3+854.20 12.617 -3.00% -3.00% 12.590 12.779 12.779 12.590
3+855.60 12.614 -3.00% -3.00% 12.587 12.776 12.776 12.587
3+857.00 12.610 -3.00% -3.00% 12.583 12.772 12.772 12.583
3+858.40 12.606 -3.00% -3.00% 12.579 12.768 12.768 12.579
3+859.80 12.603 -3.00% -3.00% 12.576 12.765 12.765 12.576
3+861.20 12.600 -3.00% -3.00% 12.573 12.762 12.762 12.573
3+862.60 12.597 -3.00% -3.00% 12.570 12.759 12.759 12.570

92 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+864.00 12.594 -3.00% -3.00% 12.567 12.756 12.756 12.567


3+865.40 12.591 -3.00% -3.00% 12.564 12.753 12.753 12.564
3+866.80 12.588 -3.00% -3.00% 12.561 12.750 12.750 12.561
3+868.20 12.586 -3.00% -3.00% 12.559 12.748 12.748 12.559
3+869.60 12.583 -3.00% -3.00% 12.556 12.745 12.745 12.556
3+871.00 12.581 -3.00% -3.00% 12.554 12.743 12.743 12.554
3+872.40 12.579 -3.00% -3.00% 12.552 12.741 12.741 12.552
3+873.80 12.577 -3.00% -3.00% 12.550 12.739 12.739 12.550
3+875.20 12.575 -3.00% -3.00% 12.548 12.737 12.737 12.548
3+876.60 12.574 -3.00% -3.00% 12.547 12.736 12.736 12.547
3+878.00 12.572 -3.00% -3.00% 12.545 12.734 12.734 12.545
3+879.40 12.571 -3.00% -3.00% 12.544 12.733 12.733 12.544
3+880.80 12.570 -3.00% -3.00% 12.543 12.732 12.732 12.543
3+882.20 12.569 -3.00% -3.00% 12.542 12.731 12.731 12.542
3+883.60 12.568 -3.00% -3.00% 12.541 12.730 12.730 12.541
3+885.00 12.567 -3.00% -3.00% 12.540 12.729 12.729 12.540
3+886.40 12.567 -3.00% -3.00% 12.540 12.729 12.729 12.540
3+887.80 12.566 -3.00% -3.00% 12.539 12.728 12.728 12.539
3+889.20 12.566 -3.00% -3.00% 12.539 12.728 12.728 12.539
3+890.60 12.566 -3.00% -3.00% 12.539 12.728 12.728 12.539
3+892.00 12.566 -3.00% -3.00% 12.539 12.728 12.728 12.539
3+893.40 12.566 -3.00% -3.00% 12.539 12.728 12.728 12.539
3+894.80 12.567 -3.00% -3.00% 12.540 12.729 12.729 12.540
3+896.20 12.567 -3.00% -3.00% 12.540 12.729 12.729 12.540
3+897.60 12.568 -3.00% -3.00% 12.541 12.730 12.730 12.541
3+899.00 12.569 -3.00% -3.00% 12.542 12.731 12.731 12.542
3+900.40 12.570 -3.00% -3.00% 12.543 12.732 12.732 12.543
3+901.80 12.571 -3.00% -3.00% 12.544 12.733 12.733 12.544
3+903.20 12.572 -3.00% -3.00% 12.545 12.734 12.734 12.545
3+904.60 12.573 -3.00% -3.00% 12.546 12.735 12.735 12.546

93 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+906.00 12.575 -3.00% -3.00% 12.548 12.737 12.737 12.548


3+907.40 12.577 -3.00% -3.00% 12.550 12.739 12.739 12.550
3+908.80 12.578 -3.00% -3.00% 12.551 12.740 12.740 12.551
3+910.20 12.580 -3.00% -3.00% 12.553 12.742 12.742 12.553
3+911.60 12.583 -3.00% -3.00% 12.556 12.745 12.745 12.556
3+913.00 12.585 -3.00% -3.00% 12.558 12.747 12.747 12.558
3+914.40 12.587 -3.00% -3.00% 12.560 12.749 12.749 12.560
3+915.80 12.590 -3.00% -3.00% 12.563 12.752 12.752 12.563
3+917.20 12.593 -3.00% -3.00% 12.566 12.755 12.755 12.566
3+918.60 12.596 -3.00% -3.00% 12.569 12.758 12.758 12.569
3+920.00 12.599 -3.00% -3.00% 12.572 12.761 12.761 12.572
3+921.40 12.602 -3.00% -3.00% 12.575 12.764 12.764 12.575
3+922.80 12.605 -3.00% -3.00% 12.578 12.767 12.767 12.578
3+924.20 12.609 -3.00% -3.00% 12.582 12.771 12.771 12.582
3+925.60 12.612 -3.00% -3.00% 12.585 12.774 12.774 12.585
3+927.00 12.616 -3.00% -3.00% 12.589 12.778 12.778 12.589
3+928.40 12.620 -3.00% -3.00% 12.593 12.782 12.782 12.593
3+929.80 12.624 -3.00% -3.00% 12.597 12.786 12.786 12.597
3+931.20 12.628 -3.00% -3.00% 12.601 12.790 12.790 12.601
3+932.60 12.633 -3.00% -3.00% 12.606 12.795 12.795 12.606
3+934.00 12.637 -3.00% -3.00% 12.610 12.799 12.799 12.610
3+935.40 12.642 -3.00% -3.00% 12.615 12.804 12.804 12.615
3+936.80 12.647 -3.00% -3.00% 12.620 12.809 12.809 12.620
3+938.20 12.652 -3.00% -3.00% 12.625 12.814 12.814 12.625
3+939.60 12.657 -3.00% -3.00% 12.630 12.819 12.819 12.630
3+941.00 12.662 -3.00% -3.00% 12.635 12.824 12.824 12.635
3+942.40 12.668 -3.00% -3.00% 12.641 12.830 12.830 12.641
3+943.80 12.673 -3.00% -3.00% 12.646 12.835 12.835 12.646
3+945.20 12.679 -3.00% -3.00% 12.652 12.841 12.841 12.652
3+946.60 12.685 -3.00% -3.00% 12.658 12.847 12.847 12.658

94 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+948.00 12.691 -3.00% -3.00% 12.664 12.853 12.853 12.664


3+949.40 12.697 -3.00% -3.00% 12.670 12.859 12.859 12.670
3+950.80 12.704 -3.00% -3.00% 12.677 12.866 12.866 12.677
3+952.20 12.710 -3.00% -3.00% 12.683 12.872 12.872 12.683
3+953.60 12.717 -3.00% -3.00% 12.690 12.879 12.879 12.690
3+955.00 12.723 -3.00% -3.00% 12.696 12.885 12.885 12.696
3+956.40 12.730 -3.00% -3.00% 12.703 12.892 12.892 12.703
3+957.80 12.737 -3.00% -3.00% 12.710 12.899 12.899 12.710
3+959.20 12.745 -3.00% -3.00% 12.718 12.907 12.907 12.718
3+960.60 12.752 -3.00% -3.00% 12.725 12.914 12.914 12.725
3+962.00 12.760 -3.00% -3.00% 12.733 12.922 12.922 12.733
3+963.40 12.767 -3.00% -3.00% 12.740 12.929 12.929 12.740
3+964.80 12.775 -3.00% -3.00% 12.748 12.937 12.937 12.748
3+966.20 12.783 -3.00% -3.00% 12.756 12.945 12.945 12.756
3+967.60 12.791 -3.00% -3.00% 12.764 12.953 12.953 12.764
3+969.00 12.800 -3.00% -3.00% 12.773 12.962 12.962 12.773
3+970.40 12.808 -3.00% -3.00% 12.781 12.970 12.970 12.781
3+971.80 12.817 -3.00% -3.00% 12.790 12.979 12.979 12.790
3+973.20 12.825 -3.00% -3.00% 12.798 12.987 12.987 12.798
3+974.60 12.834 -3.00% -3.00% 12.807 12.996 12.996 12.807
3+976.00 12.843 -3.00% -3.00% 12.816 13.005 13.005 12.816
3+977.40 12.852 -3.00% -3.00% 12.825 13.014 13.014 12.825
3+978.80 12.862 -3.00% -3.00% 12.835 13.024 13.024 12.835
3+980.20 12.871 -3.00% -3.00% 12.844 13.033 13.033 12.844
3+981.60 12.881 -3.00% -3.00% 12.854 13.043 13.043 12.854
3+983.00 12.891 -3.00% -3.00% 12.864 13.053 13.053 12.864
3+984.40 12.901 -3.00% -3.00% 12.874 13.063 13.063 12.874
3+985.80 12.911 -3.00% -3.00% 12.884 13.073 13.073 12.884
3+987.20 12.921 -3.00% -3.00% 12.894 13.083 13.083 12.894
3+988.60 12.931 -3.00% -3.00% 12.904 13.093 13.093 12.904

95 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

3+990.00 12.942 -3.00% -3.00% 12.915 13.104 13.104 12.915


3+991.40 12.953 -3.00% -3.00% 12.926 13.115 13.115 12.926
3+992.80 12.963 -3.00% -3.00% 12.936 13.125 13.125 12.936
3+994.20 12.974 -3.00% -3.00% 12.947 13.136 13.136 12.947
3+995.60 12.985 -3.00% -3.00% 12.958 13.147 13.147 12.958
3+997.00 12.997 -3.00% -3.00% 12.970 13.159 13.159 12.970
3+998.40 13.008 -3.00% -3.00% 12.981 13.170 13.170 12.981
3+999.80 13.019 -3.00% -3.00% 12.992 13.181 13.181 12.992
4+001.20 13.030 -3.00% -3.00% 13.003 13.192 13.192 13.003
4+002.60 13.041 -3.00% -3.00% 13.014 13.203 13.203 13.014
4+004.00 13.052 -3.00% -3.00% 13.025 13.214 13.214 13.025
4+005.40 13.063 -3.00% -3.00% 13.036 13.225 13.225 13.036
4+006.80 13.074 -3.00% -3.00% 13.047 13.236 13.236 13.047
4+008.20 13.085 -3.00% -3.00% 13.058 13.247 13.247 13.058
4+009.60 13.097 -3.00% -3.00% 13.070 13.259 13.259 13.070
4+011.00 13.108 -3.00% -3.00% 13.081 13.270 13.270 13.081
4+012.40 13.119 -3.00% -3.00% 13.092 13.281 13.281 13.092
4+013.80 13.130 -3.00% -3.00% 13.103 13.292 13.292 13.103
4+015.20 13.141 -3.00% -3.00% 13.114 13.303 13.303 13.114
4+016.60 13.152 -3.00% -3.00% 13.125 13.314 13.314 13.125
4+018.00 13.163 -3.00% -3.00% 13.136 13.325 13.325 13.136
4+019.40 13.174 -3.00% -3.00% 13.147 13.336 13.336 13.147
4+020.80 13.185 -3.00% -3.00% 13.158 13.347 13.347 13.158
4+022.20 13.197 -3.00% -3.00% 13.170 13.359 13.359 13.170
4+023.60 13.208 -3.00% -3.00% 13.181 13.370 13.370 13.181
4+025.00 13.219 -3.00% -3.00% 13.192 13.381 13.381 13.192
4+026.40 13.230 -3.00% -3.00% 13.203 13.392 13.392 13.203
4+027.80 13.241 -3.00% -3.00% 13.214 13.403 13.403 13.214
4+029.20 13.252 -3.00% -3.00% 13.225 13.414 13.414 13.225
4+030.60 13.263 -3.00% -3.00% 13.236 13.425 13.425 13.236

96 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+032.00 13.274 -3.00% -3.00% 13.247 13.436 13.436 13.247


4+033.40 13.285 -3.00% -3.00% 13.258 13.447 13.447 13.258
4+034.80 13.297 -3.00% -3.00% 13.270 13.459 13.459 13.270
4+036.20 13.308 -3.00% -3.00% 13.281 13.470 13.470 13.281
4+037.60 13.319 -3.00% -3.00% 13.292 13.481 13.481 13.292
4+039.00 13.330 -3.00% -3.00% 13.303 13.492 13.492 13.303
4+040.40 13.341 -3.00% -3.00% 13.314 13.503 13.503 13.314
4+041.80 13.352 -3.00% -3.00% 13.325 13.514 13.514 13.325
4+043.20 13.363 -3.00% -3.00% 13.336 13.525 13.525 13.336
4+044.60 13.374 -3.00% -3.00% 13.347 13.536 13.536 13.347
4+046.00 13.385 -3.00% -3.00% 13.358 13.547 13.547 13.358
4+047.40 13.397 -3.00% -3.00% 13.370 13.559 13.559 13.370
4+048.80 13.408 -3.00% -3.00% 13.381 13.570 13.570 13.381
4+050.20 13.419 -3.00% -3.00% 13.392 13.581 13.581 13.392
4+051.60 13.430 -3.00% -3.00% 13.403 13.592 13.592 13.403
4+053.00 13.441 -3.00% -3.00% 13.414 13.603 13.603 13.414
4+054.40 13.452 -3.00% -3.00% 13.425 13.614 13.614 13.425
4+055.80 13.463 -3.00% -3.00% 13.436 13.625 13.625 13.436
4+057.20 13.474 -3.00% -3.00% 13.447 13.636 13.636 13.447
4+058.60 13.485 -3.00% -3.00% 13.458 13.647 13.647 13.458
4+060.00 13.497 -3.00% -3.00% 13.470 13.659 13.659 13.470
4+061.40 13.508 -3.00% -3.00% 13.481 13.670 13.670 13.481
4+062.80 13.519 -3.00% -3.00% 13.492 13.681 13.681 13.492
4+064.20 13.530 -3.00% -3.00% 13.503 13.692 13.692 13.503
4+065.60 13.541 -3.00% -3.00% 13.514 13.703 13.703 13.514
4+067.00 13.552 -3.00% -3.00% 13.525 13.714 13.714 13.525
4+068.40 13.563 -3.00% -3.00% 13.536 13.725 13.725 13.536
4+069.80 13.574 -3.00% -3.00% 13.547 13.736 13.736 13.547
4+071.20 13.585 -3.00% -3.00% 13.558 13.747 13.747 13.558
4+072.60 13.597 -3.00% -3.00% 13.570 13.759 13.759 13.570

97 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+074.00 13.608 -3.00% -3.00% 13.581 13.770 13.770 13.581


4+075.40 13.619 -3.00% -3.00% 13.592 13.781 13.781 13.592
4+076.80 13.630 -3.00% -3.00% 13.603 13.792 13.792 13.603
4+078.20 13.641 -3.00% -3.00% 13.614 13.803 13.803 13.614
4+079.60 13.652 -3.00% -3.00% 13.625 13.814 13.814 13.625
4+081.00 13.663 -3.00% -3.00% 13.636 13.825 13.825 13.636
4+082.40 13.674 -3.00% -3.00% 13.647 13.836 13.836 13.647
4+083.80 13.685 -3.00% -3.00% 13.658 13.847 13.847 13.658
4+085.20 13.696 -3.00% -3.00% 13.669 13.858 13.858 13.669
4+086.60 13.708 -3.00% -3.00% 13.681 13.870 13.870 13.681
4+088.00 13.719 -3.00% -3.00% 13.692 13.881 13.881 13.692
4+089.40 13.730 -3.00% -3.00% 13.703 13.892 13.892 13.703
4+090.80 13.741 -3.00% -3.00% 13.714 13.903 13.903 13.714
4+092.20 13.752 -3.00% -3.00% 13.725 13.914 13.914 13.725
4+093.60 13.763 -3.00% -3.00% 13.736 13.925 13.925 13.736
4+095.00 13.774 -3.00% -3.00% 13.747 13.936 13.936 13.747
4+096.40 13.785 -3.00% -3.00% 13.758 13.947 13.947 13.758
4+097.80 13.796 -3.00% -3.00% 13.769 13.958 13.958 13.769
4+099.20 13.808 -3.00% -3.00% 13.781 13.970 13.970 13.781
4+100.60 13.819 -3.00% -3.00% 13.792 13.981 13.981 13.792
4+102.00 13.830 -3.00% -3.00% 13.803 13.992 13.992 13.803
4+103.40 13.841 -3.00% -3.00% 13.814 14.003 14.003 13.814
4+104.80 13.852 -3.00% -3.00% 13.825 14.014 14.014 13.825
4+106.20 13.863 -3.00% -3.00% 13.836 14.025 14.025 13.836
4+107.60 13.874 -3.00% -3.00% 13.847 14.036 14.036 13.847
4+109.00 13.885 -3.00% -3.00% 13.858 14.047 14.047 13.858
4+110.40 13.896 -3.00% -3.00% 13.869 14.058 14.058 13.869
4+111.80 13.908 -3.00% -3.00% 13.881 14.070 14.070 13.881
4+113.20 13.919 -3.00% -3.00% 13.892 14.081 14.081 13.892
4+114.60 13.930 -3.00% -3.00% 13.903 14.092 14.092 13.903

98 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+116.00 13.941 -3.00% -3.00% 13.914 14.103 14.103 13.914


4+117.40 13.952 -3.00% -3.00% 13.925 14.114 14.114 13.925
4+118.80 13.963 -3.00% -3.00% 13.936 14.125 14.125 13.936
4+120.20 13.974 -3.00% -3.00% 13.947 14.136 14.136 13.947
4+121.60 13.985 -3.00% -3.00% 13.958 14.147 14.147 13.958
4+123.00 13.996 -3.00% -3.00% 13.969 14.158 14.158 13.969
4+124.40 14.008 -3.00% -3.00% 13.981 14.170 14.170 13.981
4+125.80 14.019 -3.00% -3.00% 13.992 14.181 14.181 13.992
4+127.20 14.030 -3.00% -3.00% 14.003 14.192 14.192 14.003
4+128.60 14.041 -3.00% -3.00% 14.014 14.203 14.203 14.014
4+130.00 14.052 -3.00% -3.00% 14.025 14.214 14.214 14.025
4+131.40 14.063 -3.00% -3.00% 14.036 14.225 14.225 14.036
4+132.80 14.074 -3.00% -3.00% 14.047 14.236 14.236 14.047
4+134.20 14.085 -3.00% -3.00% 14.058 14.247 14.247 14.058
4+135.60 14.096 -3.00% -3.00% 14.069 14.258 14.258 14.069
4+137.00 14.108 -3.00% -3.00% 14.081 14.270 14.270 14.081
4+138.40 14.119 -3.00% -3.00% 14.092 14.281 14.281 14.092
4+139.80 14.130 -3.00% -3.00% 14.103 14.292 14.292 14.103
4+141.20 14.141 -3.00% -3.00% 14.114 14.303 14.303 14.114
4+142.60 14.152 -3.00% -3.00% 14.125 14.314 14.314 14.125
4+144.00 14.163 -3.00% -3.00% 14.136 14.325 14.325 14.136
4+145.40 14.174 -3.00% -3.00% 14.147 14.336 14.336 14.147
4+146.80 14.185 -3.00% -3.00% 14.158 14.347 14.347 14.158
4+148.20 14.196 -3.00% -3.00% 14.169 14.358 14.358 14.169
4+149.60 14.208 -3.00% -3.00% 14.181 14.370 14.370 14.181
4+151.00 14.219 -3.00% -3.00% 14.192 14.381 14.381 14.192
4+152.40 14.230 -3.00% -3.00% 14.203 14.392 14.392 14.203
4+153.80 14.241 -3.00% -3.00% 14.214 14.403 14.403 14.214
4+155.20 14.252 -3.00% -3.00% 14.225 14.414 14.414 14.225
4+156.60 14.263 -3.00% -3.00% 14.236 14.425 14.425 14.236

99 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+158.00 14.274 -3.00% -3.00% 14.247 14.436 14.436 14.247


4+159.40 14.285 -3.00% -3.00% 14.258 14.447 14.447 14.258
4+160.80 14.296 -3.00% -3.00% 14.269 14.458 14.458 14.269
4+162.20 14.308 -3.00% -3.00% 14.281 14.470 14.470 14.281
4+163.60 14.319 -3.00% -3.00% 14.292 14.481 14.481 14.292
4+165.00 14.330 -3.00% -3.00% 14.303 14.492 14.492 14.303
4+166.40 14.341 -3.00% -3.00% 14.314 14.503 14.503 14.314
4+167.80 14.352 -3.00% -3.00% 14.325 14.514 14.514 14.325
4+169.20 14.363 -3.00% -3.00% 14.336 14.525 14.525 14.336
4+170.60 14.374 -3.00% -3.00% 14.347 14.536 14.536 14.347
4+172.00 14.385 -3.00% -3.00% 14.358 14.547 14.547 14.358
4+173.40 14.396 -3.00% -3.00% 14.369 14.558 14.558 14.369
4+174.80 14.408 -3.00% -3.00% 14.381 14.570 14.570 14.381
4+176.20 14.419 -3.00% -3.00% 14.392 14.581 14.581 14.392
4+177.60 14.430 -3.00% -3.00% 14.403 14.592 14.592 14.403
4+179.00 14.441 -3.00% -3.00% 14.414 14.603 14.603 14.414
4+180.40 14.452 -3.00% -3.00% 14.425 14.614 14.614 14.425
4+181.80 14.463 -3.00% -3.00% 14.436 14.625 14.625 14.436
4+183.20 14.474 -3.00% -3.00% 14.447 14.636 14.636 14.447
4+184.60 14.485 -3.00% -3.00% 14.458 14.647 14.647 14.458
4+186.00 14.496 -3.00% -3.00% 14.469 14.658 14.658 14.469
4+187.40 14.507 -3.00% -3.00% 14.480 14.669 14.669 14.480
4+188.80 14.519 -3.00% -3.00% 14.492 14.681 14.681 14.492
4+190.20 14.530 -3.00% -3.00% 14.503 14.692 14.692 14.503
4+191.60 14.541 -3.00% -3.00% 14.514 14.703 14.703 14.514
4+193.00 14.552 -3.00% -3.00% 14.525 14.714 14.714 14.525
4+194.40 14.563 -3.00% -3.00% 14.536 14.725 14.725 14.536
4+195.80 14.574 -3.00% -3.00% 14.547 14.736 14.736 14.547
4+197.20 14.585 -3.00% -3.00% 14.558 14.747 14.747 14.558
4+198.60 14.596 -3.00% -3.00% 14.569 14.758 14.758 14.569

100 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+200.00 14.607 -3.00% -3.00% 14.580 14.769 14.769 14.580


4+201.40 14.619 -3.00% -3.00% 14.592 14.781 14.781 14.592
4+202.80 14.630 -3.00% -3.00% 14.603 14.792 14.792 14.603
4+204.20 14.641 -3.00% -3.00% 14.614 14.803 14.803 14.614
4+205.60 14.652 -3.00% -3.00% 14.625 14.814 14.814 14.625
4+207.00 14.663 -3.00% -3.00% 14.636 14.825 14.825 14.636
4+208.40 14.674 -3.00% -3.00% 14.647 14.836 14.836 14.647
4+209.80 14.685 -3.00% -3.00% 14.658 14.847 14.847 14.658
4+211.20 14.696 -3.00% -3.00% 14.669 14.858 14.858 14.669
4+212.60 14.707 -3.00% -3.00% 14.680 14.869 14.869 14.680
4+214.00 14.719 -3.00% -3.00% 14.692 14.881 14.881 14.692
4+215.40 14.730 -3.00% -3.00% 14.703 14.892 14.892 14.703
4+216.80 14.741 -3.00% -3.00% 14.714 14.903 14.903 14.714
4+218.20 14.752 -3.00% -3.00% 14.725 14.914 14.914 14.725
4+219.60 14.762 -3.00% -3.00% 14.735 14.924 14.924 14.735
4+221.00 14.773 -3.00% -3.00% 14.746 14.935 14.935 14.746
4+222.40 14.783 -3.00% -3.00% 14.756 14.945 14.945 14.756
4+223.80 14.793 -3.00% -3.00% 14.766 14.955 14.955 14.766
4+225.20 14.804 -3.00% -3.00% 14.777 14.966 14.966 14.777
4+226.60 14.813 -3.00% -3.00% 14.786 14.975 14.975 14.786
4+228.00 14.823 -3.00% -3.00% 14.796 14.985 14.985 14.796
4+229.40 14.833 -3.00% -3.00% 14.806 14.995 14.995 14.806
4+230.80 14.842 -3.00% -3.00% 14.815 15.004 15.004 14.815
4+232.20 14.852 -3.00% -3.00% 14.825 15.014 15.014 14.825
4+233.60 14.861 -3.00% -3.00% 14.834 15.023 15.023 14.834
4+235.00 14.870 -3.00% -3.00% 14.843 15.032 15.032 14.843
4+236.40 14.878 -3.00% -3.00% 14.851 15.040 15.040 14.851
4+237.80 14.887 -3.00% -3.00% 14.860 15.049 15.049 14.860
4+239.20 14.896 -3.00% -3.00% 14.869 15.058 15.058 14.869
4+240.60 14.904 -3.00% -3.00% 14.877 15.066 15.066 14.877

101 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+242.00 14.912 -3.00% -3.00% 14.885 15.074 15.074 14.885


4+243.40 14.920 -3.00% -3.00% 14.893 15.082 15.082 14.893
4+244.80 14.928 -3.00% -3.00% 14.901 15.090 15.090 14.901
4+246.20 14.936 -3.00% -3.00% 14.909 15.098 15.098 14.909
4+247.60 14.943 -3.00% -3.00% 14.916 15.105 15.105 14.916
4+249.00 14.950 -3.00% -3.00% 14.923 15.112 15.112 14.923
4+250.40 14.958 -3.00% -3.00% 14.931 15.120 15.120 14.931
4+251.80 14.965 -3.00% -3.00% 14.938 15.127 15.127 14.938
4+253.20 14.972 -3.00% -3.00% 14.945 15.134 15.134 14.945
4+254.60 14.978 -3.00% -3.00% 14.951 15.140 15.140 14.951
4+256.00 14.985 -3.00% -3.00% 14.958 15.147 15.147 14.958
4+257.40 14.991 -3.00% -3.00% 14.964 15.153 15.153 14.964
4+258.80 14.998 -3.00% -3.00% 14.971 15.160 15.160 14.971
4+260.20 15.004 -3.00% -3.00% 14.977 15.166 15.166 14.977
4+261.60 15.010 -3.00% -3.00% 14.983 15.172 15.172 14.983
4+263.00 15.015 -3.00% -3.00% 14.988 15.177 15.177 14.988
4+264.40 15.021 -3.00% -3.00% 14.994 15.183 15.183 14.994
4+265.80 15.026 -3.00% -3.00% 14.999 15.188 15.188 14.999
4+267.20 15.032 -3.00% -3.00% 15.005 15.194 15.194 15.005
4+268.60 15.037 -3.00% -3.00% 15.010 15.199 15.199 15.010
4+270.00 15.042 -3.00% -3.00% 15.015 15.204 15.204 15.015
4+271.40 15.047 -3.00% -3.00% 15.020 15.209 15.209 15.020
4+272.80 15.051 -3.00% -3.00% 15.024 15.213 15.213 15.024
4+274.20 15.056 -3.00% -3.00% 15.029 15.218 15.218 15.029
4+275.60 15.060 -3.00% -3.00% 15.033 15.222 15.222 15.033
4+277.00 15.064 -3.00% -3.00% 15.037 15.226 15.226 15.037
4+278.40 15.068 -3.00% -3.00% 15.041 15.230 15.230 15.041
4+279.80 15.072 -3.00% -3.00% 15.045 15.234 15.234 15.045
4+281.20 15.076 -3.00% -3.00% 15.049 15.238 15.238 15.049
4+282.60 15.079 -3.00% -3.00% 15.052 15.241 15.241 15.052

102 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+284.00 15.083 -3.00% -3.00% 15.056 15.245 15.245 15.056


4+285.40 15.086 -3.00% -3.00% 15.059 15.248 15.248 15.059
4+286.80 15.089 -3.00% -3.00% 15.062 15.251 15.251 15.062
4+288.20 15.092 -3.00% -3.00% 15.065 15.254 15.254 15.065
4+289.60 15.095 -3.00% -3.00% 15.068 15.257 15.257 15.068
4+291.00 15.097 -3.00% -3.00% 15.070 15.259 15.259 15.070
4+292.40 15.100 -3.00% -3.00% 15.073 15.262 15.262 15.073
4+293.80 15.102 -3.00% -3.00% 15.075 15.264 15.264 15.075
4+295.20 15.104 -3.00% -3.00% 15.077 15.266 15.266 15.077
4+296.60 15.106 -3.00% -3.00% 15.079 15.268 15.268 15.079
4+298.00 15.108 -3.00% -3.00% 15.081 15.270 15.270 15.081
4+299.40 15.109 -3.00% -3.00% 15.082 15.271 15.271 15.082
4+300.80 15.111 -3.00% -3.00% 15.084 15.273 15.273 15.084
4+302.20 15.112 -3.00% -3.00% 15.085 15.274 15.274 15.085
4+303.60 15.113 -3.00% -3.00% 15.086 15.275 15.275 15.086
4+305.00 15.114 -3.00% -3.00% 15.087 15.276 15.276 15.087
4+306.40 15.115 -3.00% -3.00% 15.088 15.277 15.277 15.088
4+307.80 15.116 -3.00% -3.00% 15.089 15.278 15.278 15.089
4+309.20 15.116 -3.00% -3.00% 15.089 15.278 15.278 15.089
4+310.60 15.117 -3.00% -3.00% 15.090 15.279 15.279 15.090
4+312.00 15.117 -3.00% -3.00% 15.090 15.279 15.279 15.090
4+313.40 15.117 -3.00% -3.00% 15.090 15.279 15.279 15.090
4+314.80 15.117 -3.00% -3.00% 15.090 15.279 15.279 15.090
4+316.20 15.116 -3.00% -3.00% 15.089 15.278 15.278 15.089
4+317.60 15.116 -3.00% -3.00% 15.089 15.278 15.278 15.089
4+319.00 15.115 -3.00% -3.00% 15.088 15.277 15.277 15.088
4+320.40 15.115 -3.00% -3.00% 15.088 15.277 15.277 15.088
4+321.80 15.114 -3.00% -3.00% 15.087 15.276 15.276 15.087
4+323.20 15.113 -3.00% -3.00% 15.086 15.275 15.275 15.086
4+324.60 15.112 -3.00% -3.00% 15.085 15.274 15.274 15.085

103 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+326.00 15.112 -3.00% -3.00% 15.085 15.274 15.274 15.085


4+327.40 15.111 -3.00% -3.00% 15.084 15.273 15.273 15.084
4+328.80 15.110 -3.00% -3.00% 15.083 15.272 15.272 15.083
4+330.20 15.109 -3.00% -3.00% 15.082 15.271 15.271 15.082
4+331.60 15.109 -3.00% -3.00% 15.082 15.271 15.271 15.082
4+333.00 15.108 -3.00% -3.00% 15.081 15.270 15.270 15.081
4+334.40 15.107 -3.00% -3.00% 15.080 15.269 15.269 15.080
4+335.80 15.106 -3.00% -3.00% 15.079 15.268 15.268 15.079
4+337.20 15.106 -3.00% -3.00% 15.079 15.268 15.268 15.079
4+338.60 15.105 -3.00% -3.00% 15.078 15.267 15.267 15.078
4+340.00 15.104 -3.00% -3.00% 15.077 15.266 15.266 15.077
4+341.40 15.103 -3.00% -3.00% 15.076 15.265 15.265 15.076
4+342.80 15.103 -3.00% -3.00% 15.076 15.265 15.265 15.076
4+344.20 15.102 -3.00% -3.00% 15.075 15.264 15.264 15.075
4+345.60 15.101 -3.00% -3.00% 15.074 15.263 15.263 15.074
4+347.00 15.100 -3.00% -3.00% 15.073 15.262 15.262 15.073
4+348.40 15.100 -3.00% -3.00% 15.073 15.262 15.262 15.073
4+349.80 15.099 -3.00% -3.00% 15.072 15.261 15.261 15.072
4+351.20 15.098 -3.00% -3.00% 15.071 15.260 15.260 15.071
4+352.60 15.097 -3.00% -3.00% 15.070 15.259 15.259 15.070
4+354.00 15.097 -3.00% -3.00% 15.070 15.259 15.259 15.070
4+355.40 15.096 -3.00% -3.00% 15.069 15.258 15.258 15.069
4+356.80 15.095 -3.00% -3.00% 15.068 15.257 15.257 15.068
4+358.20 15.094 -3.00% -3.00% 15.067 15.256 15.256 15.067
4+359.60 15.094 -3.00% -3.00% 15.067 15.256 15.256 15.067
4+361.00 15.093 -3.00% -3.00% 15.066 15.255 15.255 15.066
4+362.40 15.092 -3.00% -3.00% 15.065 15.254 15.254 15.065
4+363.80 15.091 -3.00% -3.00% 15.064 15.253 15.253 15.064
4+365.20 15.090 -3.00% -3.00% 15.063 15.252 15.252 15.063
4+366.60 15.090 -3.00% -3.00% 15.063 15.252 15.252 15.063

104 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+368.00 15.089 -3.00% -3.00% 15.062 15.251 15.251 15.062


4+369.40 15.088 -3.00% -3.00% 15.061 15.250 15.250 15.061
4+370.80 15.087 -3.00% -3.00% 15.060 15.249 15.249 15.060
4+372.20 15.087 -3.00% -3.00% 15.060 15.249 15.249 15.060
4+373.60 15.086 -3.00% -3.00% 15.059 15.248 15.248 15.059
4+375.00 15.085 -3.00% -3.00% 15.058 15.247 15.247 15.058
4+376.40 15.084 -3.00% -3.00% 15.057 15.246 15.246 15.057
4+377.80 15.084 -3.00% -3.00% 15.057 15.246 15.246 15.057
4+379.20 15.083 -3.00% -3.00% 15.056 15.245 15.245 15.056
4+380.60 15.082 -3.00% -3.00% 15.055 15.244 15.244 15.055
4+382.00 15.081 -3.00% -3.00% 15.054 15.243 15.243 15.054
4+383.40 15.081 -3.00% -3.00% 15.054 15.243 15.243 15.054
4+384.80 15.080 -3.00% -3.00% 15.053 15.242 15.242 15.053
4+386.20 15.079 -3.00% -3.00% 15.052 15.241 15.241 15.052
4+387.60 15.078 -3.00% -3.00% 15.051 15.240 15.240 15.051
4+389.00 15.078 -3.00% -3.00% 15.051 15.240 15.240 15.051
4+390.40 15.077 -3.00% -3.00% 15.050 15.239 15.239 15.050
4+391.80 15.076 -3.00% -3.00% 15.049 15.238 15.238 15.049
4+393.20 15.075 -3.00% -3.00% 15.048 15.237 15.237 15.048
4+394.60 15.075 -3.00% -3.00% 15.048 15.237 15.237 15.048
4+396.00 15.074 -3.00% -3.00% 15.047 15.236 15.236 15.047
4+397.40 15.073 -3.00% -3.00% 15.046 15.235 15.235 15.046
4+398.80 15.072 -3.00% -3.00% 15.045 15.234 15.234 15.045
4+400.20 15.072 -3.00% -3.00% 15.045 15.234 15.234 15.045
4+401.60 15.071 -3.00% -3.00% 15.044 15.233 15.233 15.044
4+403.00 15.070 -3.00% -3.00% 15.043 15.232 15.232 15.043
4+404.40 15.069 -3.00% -3.00% 15.042 15.231 15.231 15.042
4+405.80 15.069 -3.00% -3.00% 15.042 15.231 15.231 15.042
4+407.20 15.068 -3.00% -3.00% 15.041 15.230 15.230 15.041
4+408.60 15.067 -3.00% -3.00% 15.040 15.229 15.229 15.040

105 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+410.00 15.066 -3.00% -3.00% 15.039 15.228 15.228 15.039


4+411.40 15.066 -3.00% -3.00% 15.039 15.228 15.228 15.039
4+412.80 15.065 -3.00% -3.00% 15.038 15.227 15.227 15.038
4+414.20 15.064 -3.00% -3.00% 15.037 15.226 15.226 15.037
4+415.60 15.063 -3.00% -3.00% 15.036 15.225 15.225 15.036
4+417.00 15.063 -3.00% -3.00% 15.036 15.225 15.225 15.036
4+418.40 15.062 -3.00% -3.00% 15.035 15.224 15.224 15.035
4+419.80 15.061 -3.00% -3.00% 15.034 15.223 15.223 15.034
4+421.20 15.060 -3.00% -3.00% 15.033 15.222 15.222 15.033
4+422.60 15.060 -3.00% -3.00% 15.033 15.222 15.222 15.033
4+424.00 15.059 -3.00% -3.00% 15.032 15.221 15.221 15.032
4+425.40 15.058 -3.00% -3.00% 15.031 15.220 15.220 15.031
4+426.80 15.057 -3.00% -3.00% 15.030 15.219 15.219 15.030
4+428.20 15.057 -3.00% -3.00% 15.030 15.219 15.219 15.030
4+429.60 15.056 -3.00% -3.00% 15.029 15.218 15.218 15.029
4+431.00 15.055 -3.00% -3.00% 15.028 15.217 15.217 15.028
4+432.40 15.054 -3.00% -3.00% 15.027 15.216 15.216 15.027
4+433.80 15.054 -3.00% -3.00% 15.027 15.216 15.216 15.027
4+435.20 15.053 -3.00% -3.00% 15.026 15.215 15.215 15.026
4+436.60 15.052 -3.00% -3.00% 15.025 15.214 15.214 15.025
4+438.00 15.051 -3.00% -3.00% 15.024 15.213 15.213 15.024
4+439.40 15.050 -3.00% -3.00% 15.023 15.212 15.212 15.023
4+440.80 15.050 -3.00% -3.00% 15.023 15.212 15.212 15.023
4+442.20 15.049 -3.00% -3.00% 15.022 15.211 15.211 15.022
4+443.60 15.048 -3.00% -3.00% 15.021 15.210 15.210 15.021
4+445.00 15.047 -3.00% -3.00% 15.020 15.209 15.209 15.020
4+446.40 15.047 -3.00% -3.00% 15.020 15.209 15.209 15.020
4+447.80 15.046 -3.00% -3.00% 15.019 15.208 15.208 15.019
4+449.20 15.045 -3.00% -3.00% 15.018 15.207 15.207 15.018
4+450.60 15.044 -3.00% -3.00% 15.017 15.206 15.206 15.017

106 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+452.00 15.044 -3.00% -3.00% 15.017 15.206 15.206 15.017


4+453.40 15.043 -3.00% -3.00% 15.016 15.205 15.205 15.016
4+454.80 15.042 -3.00% -3.00% 15.015 15.204 15.204 15.015
4+456.20 15.041 -3.00% -3.00% 15.014 15.203 15.203 15.014
4+457.60 15.041 -3.00% -3.00% 15.014 15.203 15.203 15.014
4+459.00 15.040 -3.00% -3.00% 15.013 15.202 15.202 15.013
4+460.40 15.039 -3.00% -3.00% 15.012 15.201 15.201 15.012
4+461.80 15.038 -3.00% -3.00% 15.011 15.200 15.200 15.011
4+463.20 15.038 -3.00% -3.00% 15.011 15.200 15.200 15.011
4+464.60 15.037 -3.00% -3.00% 15.010 15.199 15.199 15.010
4+466.00 15.036 -3.00% -3.00% 15.009 15.198 15.198 15.009
4+467.40 15.035 -3.00% -3.00% 15.008 15.197 15.197 15.008
4+468.80 15.035 -3.00% -3.00% 15.008 15.197 15.197 15.008
4+470.20 15.034 -3.00% -3.00% 15.007 15.196 15.196 15.007
4+471.60 15.033 -3.00% -3.00% 15.006 15.195 15.195 15.006
4+473.00 15.032 -3.00% -3.00% 15.005 15.194 15.194 15.005
4+474.40 15.032 -3.00% -3.00% 15.005 15.194 15.194 15.005
4+475.80 15.031 -3.00% -3.00% 15.004 15.193 15.193 15.004
4+477.20 15.030 -3.00% -3.00% 15.003 15.192 15.192 15.003
4+478.60 15.029 -3.00% -3.00% 15.002 15.191 15.191 15.002
4+480.00 15.029 -3.00% -3.00% 15.002 15.191 15.191 15.002
4+481.40 15.028 -3.00% -3.00% 15.001 15.190 15.190 15.001
4+482.80 15.027 -3.00% -3.00% 15.000 15.189 15.189 15.000
4+484.20 15.026 -3.00% -3.00% 14.999 15.188 15.188 14.999
4+485.60 15.026 -3.00% -3.00% 14.999 15.188 15.188 14.999
4+487.00 15.025 -3.00% -3.00% 14.998 15.187 15.187 14.998
4+488.40 15.024 -3.00% -3.00% 14.997 15.186 15.186 14.997
4+489.80 15.023 -3.00% -3.00% 14.996 15.185 15.185 14.996
4+491.20 15.023 -3.00% -3.00% 14.996 15.185 15.185 14.996
4+492.60 15.022 -3.00% -3.00% 14.995 15.184 15.184 14.995

107 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+494.00 15.021 -3.00% -3.00% 14.994 15.183 15.183 14.994


4+495.40 15.020 -3.00% -3.00% 14.993 15.182 15.182 14.993
4+496.80 15.020 -3.00% -3.00% 14.993 15.182 15.182 14.993
4+498.20 15.019 -3.00% -3.00% 14.992 15.181 15.181 14.992
4+499.60 15.018 -3.00% -3.00% 14.991 15.180 15.180 14.991
4+501.00 15.017 -3.00% -3.00% 14.990 15.179 15.179 14.990
4+502.40 15.017 -3.00% -3.00% 14.990 15.179 15.179 14.990
4+503.80 15.016 -3.00% -3.00% 14.989 15.178 15.178 14.989
4+505.20 15.015 -3.00% -3.00% 14.988 15.177 15.177 14.988
4+506.60 15.014 -3.00% -3.00% 14.987 15.176 15.176 14.987
4+508.00 15.014 -3.00% -3.00% 14.987 15.176 15.176 14.987
4+509.40 15.013 -3.00% -3.00% 14.986 15.175 15.175 14.986
4+510.80 15.012 -3.00% -3.00% 14.985 15.174 15.174 14.985
4+512.20 15.011 -3.00% -3.00% 14.984 15.173 15.173 14.984
4+513.60 15.011 -3.00% -3.00% 14.984 15.173 15.173 14.984
4+515.00 15.010 -3.00% -3.00% 14.983 15.172 15.172 14.983
4+516.40 15.009 -3.00% -3.00% 14.982 15.171 15.171 14.982
4+517.80 15.008 -3.00% -3.00% 14.981 15.170 15.170 14.981
4+519.20 15.007 -3.00% -3.00% 14.980 15.169 15.169 14.980
4+520.60 15.007 -3.00% -3.00% 14.980 15.169 15.169 14.980
4+522.00 15.006 -3.00% -3.00% 14.979 15.168 15.168 14.979
4+523.40 15.005 -3.00% -3.00% 14.978 15.167 15.167 14.978
4+524.80 15.004 -3.00% -3.00% 14.977 15.166 15.166 14.977
4+526.20 15.004 -3.00% -3.00% 14.977 15.166 15.166 14.977
4+527.60 15.003 -3.00% -3.00% 14.976 15.165 15.165 14.976
4+529.00 15.002 -3.00% -3.00% 14.975 15.164 15.164 14.975
4+530.40 15.001 -3.00% -3.00% 14.974 15.163 15.163 14.974
4+531.80 15.001 -3.00% -3.00% 14.974 15.163 15.163 14.974
4+533.20 15.000 -3.00% -3.00% 14.973 15.162 15.162 14.973
4+534.60 14.999 -3.00% -3.00% 14.972 15.161 15.161 14.972

108 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+536.00 14.998 -3.00% -3.00% 14.971 15.160 15.160 14.971


4+537.40 14.998 -3.00% -3.00% 14.971 15.160 15.160 14.971
4+538.80 14.997 -3.00% -3.00% 14.970 15.159 15.159 14.970
4+540.20 14.996 -3.00% -3.00% 14.969 15.158 15.158 14.969
4+541.60 14.995 -3.00% -3.00% 14.968 15.157 15.157 14.968
4+543.00 14.995 -3.00% -3.00% 14.968 15.157 15.157 14.968
4+544.40 14.994 -3.00% -3.00% 14.967 15.156 15.156 14.967
4+545.80 14.993 -3.00% -3.00% 14.966 15.155 15.155 14.966
4+547.20 14.992 -3.00% -3.00% 14.965 15.154 15.154 14.965
4+548.60 14.992 -3.00% -3.00% 14.965 15.154 15.154 14.965
4+550.00 14.991 -3.00% -3.00% 14.964 15.153 15.153 14.964
4+551.40 14.990 -3.00% -3.00% 14.963 15.152 15.152 14.963
4+552.80 14.989 -3.00% -3.00% 14.962 15.151 15.151 14.962
4+554.20 14.989 -3.00% -3.00% 14.962 15.151 15.151 14.962
4+555.60 14.988 -3.00% -3.00% 14.961 15.150 15.150 14.961
4+557.00 14.987 -3.00% -3.00% 14.960 15.149 15.149 14.960
4+558.40 14.986 -3.00% -3.00% 14.959 15.148 15.148 14.959
4+559.80 14.986 -3.00% -3.00% 14.959 15.148 15.148 14.959
4+561.20 14.985 -3.00% -3.00% 14.958 15.147 15.147 14.958
4+562.60 14.984 -3.00% -3.00% 14.957 15.146 15.146 14.957
4+564.00 14.983 -3.00% -3.00% 14.956 15.145 15.145 14.956
4+565.40 14.983 -3.00% -3.00% 14.956 15.145 15.145 14.956
4+566.80 14.982 -3.00% -3.00% 14.955 15.144 15.144 14.955
4+568.20 14.981 -3.00% -3.00% 14.954 15.143 15.143 14.954
4+569.60 14.980 -3.00% -3.00% 14.953 15.142 15.142 14.953
4+571.00 14.980 -3.00% -3.00% 14.953 15.142 15.142 14.953
4+572.40 14.979 -3.00% -3.00% 14.952 15.141 15.141 14.952
4+573.80 14.978 -3.00% -3.00% 14.951 15.140 15.140 14.951
4+575.20 14.977 -3.00% -3.00% 14.950 15.139 15.139 14.950
4+576.60 14.977 -3.00% -3.00% 14.950 15.139 15.139 14.950

109 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+578.00 14.976 -3.00% -3.00% 14.949 15.138 15.138 14.949


4+579.40 14.975 -3.00% -3.00% 14.948 15.137 15.137 14.948
4+580.80 14.974 -3.00% -3.00% 14.947 15.136 15.136 14.947
4+582.20 14.974 -3.00% -3.00% 14.947 15.136 15.136 14.947
4+583.60 14.973 -3.00% -3.00% 14.946 15.135 15.135 14.946
4+585.00 14.972 -3.00% -3.00% 14.945 15.134 15.134 14.945
4+586.40 14.971 -3.00% -3.00% 14.944 15.133 15.133 14.944
4+587.80 14.971 -3.00% -3.00% 14.944 15.133 15.133 14.944
4+589.20 14.970 -3.00% -3.00% 14.943 15.132 15.132 14.943
4+590.60 14.969 -3.00% -3.00% 14.942 15.131 15.131 14.942
4+592.00 14.968 -3.00% -3.00% 14.941 15.130 15.130 14.941
4+593.40 14.967 -3.00% -3.00% 14.940 15.129 15.129 14.940
4+594.80 14.967 -3.00% -3.00% 14.940 15.129 15.129 14.940
4+596.20 14.966 -3.00% -3.00% 14.939 15.128 15.128 14.939
4+597.60 14.965 -3.00% -3.00% 14.938 15.127 15.127 14.938
4+599.00 14.964 -3.00% -3.00% 14.937 15.126 15.126 14.937
4+600.40 14.964 -3.00% -3.00% 14.937 15.126 15.126 14.937
4+601.80 14.963 -3.00% -3.00% 14.936 15.125 15.125 14.936
4+603.20 14.962 -3.00% -3.00% 14.935 15.124 15.124 14.935
4+604.60 14.961 -3.00% -3.00% 14.934 15.123 15.123 14.934
4+606.00 14.961 -3.00% -3.00% 14.934 15.123 15.123 14.934
4+607.40 14.960 -3.00% -3.00% 14.933 15.122 15.122 14.933
4+608.80 14.959 -3.00% -3.00% 14.932 15.121 15.121 14.932
4+610.20 14.958 -3.00% -3.00% 14.931 15.120 15.120 14.931
4+611.60 14.958 -3.00% -3.00% 14.931 15.120 15.120 14.931
4+613.00 14.957 -3.00% -3.00% 14.930 15.119 15.119 14.930
4+614.40 14.956 -3.00% -3.00% 14.929 15.118 15.118 14.929
4+615.80 14.955 -3.00% -3.00% 14.928 15.117 15.117 14.928
4+617.20 14.955 -3.00% -3.00% 14.928 15.117 15.117 14.928
4+618.60 14.954 -3.00% -3.00% 14.927 15.116 15.116 14.927

110 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+620.00 14.953 -3.00% -3.00% 14.926 15.115 15.115 14.926


4+621.40 14.952 -3.00% -3.00% 14.925 15.114 15.114 14.925
4+622.80 14.952 -3.00% -3.00% 14.925 15.114 15.114 14.925
4+624.20 14.951 -3.00% -3.00% 14.924 15.113 15.113 14.924
4+625.60 14.950 -3.00% -3.00% 14.923 15.112 15.112 14.923
4+627.00 14.949 -3.00% -3.00% 14.922 15.111 15.111 14.922
4+628.40 14.948 -3.00% -3.00% 14.921 15.110 15.110 14.921
4+629.80 14.947 -3.00% -3.00% 14.920 15.109 15.109 14.920
4+631.20 14.946 -3.00% -3.00% 14.919 15.108 15.108 14.919
4+632.60 14.945 -3.00% -3.00% 14.918 15.107 15.107 14.918
4+634.00 14.944 -3.00% -3.00% 14.917 15.106 15.106 14.917
4+635.40 14.943 -3.00% -3.00% 14.916 15.105 15.105 14.916
4+636.80 14.941 -3.00% -3.00% 14.914 15.103 15.103 14.914
4+638.20 14.940 -3.00% -3.00% 14.913 15.102 15.102 14.913
4+639.60 14.939 -3.00% -3.00% 14.912 15.101 15.101 14.912
4+641.00 14.937 -3.00% -3.00% 14.910 15.099 15.099 14.910
4+642.40 14.936 -3.00% -3.00% 14.909 15.098 15.098 14.909
4+643.80 14.935 -3.00% -3.00% 14.908 15.097 15.097 14.908
4+645.20 14.933 -3.00% -3.00% 14.906 15.095 15.095 14.906
4+646.60 14.932 -3.00% -3.00% 14.905 15.094 15.094 14.905
4+648.00 14.930 -3.00% -3.00% 14.903 15.092 15.092 14.903
4+649.40 14.929 -3.00% -3.00% 14.902 15.091 15.091 14.902
4+650.80 14.927 -3.00% -3.00% 14.900 15.089 15.089 14.900
4+652.20 14.926 -3.00% -3.00% 14.899 15.088 15.088 14.899
4+653.60 14.924 -3.00% -3.00% 14.897 15.086 15.086 14.897
4+655.00 14.922 -3.00% -3.00% 14.895 15.084 15.084 14.895
4+656.40 14.921 -3.00% -3.00% 14.894 15.083 15.083 14.894
4+657.80 14.919 -3.00% -3.00% 14.892 15.081 15.081 14.892
4+659.20 14.917 -3.00% -3.00% 14.890 15.079 15.079 14.890
4+660.60 14.915 -3.00% -3.00% 14.888 15.077 15.077 14.888

111 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+662.00 14.913 -3.00% -3.00% 14.886 15.075 15.075 14.886


4+663.40 14.911 -3.00% -3.00% 14.884 15.073 15.073 14.884
4+664.80 14.909 -3.00% -3.00% 14.882 15.071 15.071 14.882
4+666.20 14.907 -3.00% -3.00% 14.880 15.069 15.069 14.880
4+667.60 14.905 -3.00% -3.00% 14.878 15.067 15.067 14.878
4+669.00 14.903 -3.00% -3.00% 14.876 15.065 15.065 14.876
4+670.40 14.901 -3.00% -3.00% 14.874 15.063 15.063 14.874
4+671.80 14.899 -3.00% -3.00% 14.872 15.061 15.061 14.872
4+673.20 14.897 -3.00% -3.00% 14.870 15.059 15.059 14.870
4+674.60 14.894 -3.00% -3.00% 14.867 15.056 15.056 14.867
4+676.00 14.892 -3.00% -3.00% 14.865 15.054 15.054 14.865
4+677.40 14.890 -3.00% -3.00% 14.863 15.052 15.052 14.863
4+678.80 14.888 -3.00% -3.00% 14.861 15.050 15.050 14.861
4+680.20 14.885 -3.00% -3.00% 14.858 15.047 15.047 14.858
4+681.60 14.883 -3.00% -3.00% 14.856 15.045 15.045 14.856
4+683.00 14.880 -3.00% -3.00% 14.853 15.042 15.042 14.853
4+684.40 14.878 -3.00% -3.00% 14.851 15.040 15.040 14.851
4+685.80 14.875 -3.00% -3.00% 14.848 15.037 15.037 14.848
4+687.20 14.873 -3.00% -3.00% 14.846 15.035 15.035 14.846
4+688.60 14.870 -3.00% -3.00% 14.843 15.032 15.032 14.843
4+690.00 14.867 -3.00% -3.00% 14.840 15.029 15.029 14.840
4+691.40 14.865 -3.00% -3.00% 14.838 15.027 15.027 14.838
4+692.80 14.862 -3.00% -3.00% 14.835 15.024 15.024 14.835
4+694.20 14.859 -3.00% -3.00% 14.832 15.021 15.021 14.832
4+695.60 14.856 -3.00% -3.00% 14.829 15.018 15.018 14.829
4+697.00 14.853 -3.00% -3.00% 14.826 15.015 15.015 14.826
4+698.40 14.851 -3.00% -3.00% 14.824 15.013 15.013 14.824
4+699.80 14.848 -3.00% -3.00% 14.821 15.010 15.010 14.821
4+701.20 14.845 -3.00% -3.00% 14.818 15.007 15.007 14.818
4+702.60 14.842 -3.00% -3.00% 14.815 15.004 15.004 14.815

112 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+704.00 14.839 -3.00% -3.00% 14.812 15.001 15.001 14.812


4+705.40 14.836 -3.00% -3.00% 14.809 14.998 14.998 14.809
4+706.80 14.833 -3.00% -3.00% 14.806 14.995 14.995 14.806
4+708.20 14.830 -3.00% -3.00% 14.803 14.992 14.992 14.803
4+709.60 14.827 -3.00% -3.00% 14.800 14.989 14.989 14.800
4+711.00 14.824 -3.00% -3.00% 14.797 14.986 14.986 14.797
4+712.40 14.821 -3.00% -3.00% 14.794 14.983 14.983 14.794
4+713.80 14.818 -3.00% -3.00% 14.791 14.980 14.980 14.791
4+715.20 14.815 -3.00% -3.00% 14.788 14.977 14.977 14.788
4+716.60 14.812 -3.00% -3.00% 14.785 14.974 14.974 14.785
4+718.00 14.809 -3.00% -3.00% 14.782 14.971 14.971 14.782
4+719.40 14.806 -3.00% -3.00% 14.779 14.968 14.968 14.779
4+720.80 14.803 -3.00% -3.00% 14.776 14.965 14.965 14.776
4+722.20 14.800 -3.00% -3.00% 14.773 14.962 14.962 14.773
4+723.60 14.797 -3.00% -3.00% 14.770 14.959 14.959 14.770
4+725.00 14.795 -3.00% -3.00% 14.768 14.957 14.957 14.768
4+726.40 14.792 -3.00% -3.00% 14.765 14.954 14.954 14.765
4+727.80 14.789 -3.00% -3.00% 14.762 14.951 14.951 14.762
4+729.20 14.786 -3.00% -3.00% 14.759 14.948 14.948 14.759
4+730.60 14.783 -3.00% -3.00% 14.756 14.945 14.945 14.756
4+732.00 14.780 -3.00% -3.00% 14.753 14.942 14.942 14.753
4+733.40 14.777 -3.00% -3.00% 14.750 14.939 14.939 14.750
4+734.80 14.774 -3.00% -3.00% 14.747 14.936 14.936 14.747
4+736.20 14.771 -3.00% -3.00% 14.744 14.933 14.933 14.744
4+737.60 14.768 -3.00% -3.00% 14.741 14.930 14.930 14.741
4+739.00 14.765 -3.00% -3.00% 14.738 14.927 14.927 14.738
4+740.40 14.762 -3.00% -3.00% 14.735 14.924 14.924 14.735
4+741.80 14.759 -3.00% -3.00% 14.732 14.921 14.921 14.732
4+743.20 14.756 -3.00% -3.00% 14.729 14.918 14.918 14.729
4+744.60 14.753 -3.00% -3.00% 14.726 14.915 14.915 14.726

113 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+746.00 14.750 -3.00% -3.00% 14.723 14.912 14.912 14.723


4+747.40 14.747 -3.00% -3.00% 14.720 14.909 14.909 14.720
4+748.80 14.744 -3.00% -3.00% 14.717 14.906 14.906 14.717
4+750.20 14.741 -3.00% -3.00% 14.714 14.903 14.903 14.714
4+751.60 14.738 -3.00% -3.00% 14.711 14.900 14.900 14.711
4+753.00 14.736 -3.00% -3.00% 14.709 14.898 14.898 14.709
4+754.40 14.733 -3.00% -3.00% 14.706 14.895 14.895 14.706
4+755.80 14.730 -3.00% -3.00% 14.703 14.892 14.892 14.703
4+757.20 14.727 -3.00% -3.00% 14.700 14.889 14.889 14.700
4+758.60 14.724 -3.00% -3.00% 14.697 14.886 14.886 14.697
4+760.00 14.721 -3.00% -3.00% 14.694 14.883 14.883 14.694
4+761.40 14.718 -3.00% -3.00% 14.691 14.880 14.880 14.691
4+762.80 14.715 -3.00% -3.00% 14.688 14.877 14.877 14.688
4+764.20 14.712 -3.00% -3.00% 14.685 14.874 14.874 14.685
4+765.60 14.709 -3.00% -3.00% 14.682 14.871 14.871 14.682
4+767.00 14.706 -3.00% -3.00% 14.679 14.868 14.868 14.679
4+768.40 14.703 -3.00% -3.00% 14.676 14.865 14.865 14.676
4+769.80 14.700 -3.00% -3.00% 14.673 14.862 14.862 14.673
4+771.20 14.697 -3.00% -3.00% 14.670 14.859 14.859 14.670
4+772.60 14.694 -3.00% -3.00% 14.667 14.856 14.856 14.667
4+774.00 14.691 -3.00% -3.00% 14.664 14.853 14.853 14.664
4+775.40 14.688 -3.00% -3.00% 14.661 14.850 14.850 14.661
4+776.80 14.685 -3.00% -3.00% 14.658 14.847 14.847 14.658
4+778.20 14.682 -3.00% -3.00% 14.655 14.844 14.844 14.655
4+779.60 14.679 -3.00% -3.00% 14.652 14.841 14.841 14.652
4+781.00 14.676 -3.00% -3.00% 14.649 14.838 14.838 14.649
4+782.40 14.674 -3.00% -3.00% 14.647 14.836 14.836 14.647
4+783.80 14.671 -3.00% -3.00% 14.644 14.833 14.833 14.644
4+785.20 14.668 -3.00% -3.00% 14.641 14.830 14.830 14.641
4+786.60 14.665 -3.00% -3.00% 14.638 14.827 14.827 14.638

114 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+788.00 14.662 -3.00% -3.00% 14.635 14.824 14.824 14.635


4+789.40 14.659 -3.00% -3.00% 14.632 14.821 14.821 14.632
4+790.80 14.656 -3.00% -3.00% 14.629 14.818 14.818 14.629
4+792.20 14.653 -3.00% -3.00% 14.626 14.815 14.815 14.626
4+793.60 14.650 -3.00% -3.00% 14.623 14.812 14.812 14.623
4+795.00 14.647 -3.00% -3.00% 14.620 14.809 14.809 14.620
4+796.40 14.644 -3.00% -3.00% 14.617 14.806 14.806 14.617
4+797.80 14.641 -3.00% -3.00% 14.614 14.803 14.803 14.614
4+799.20 14.638 -3.00% -3.00% 14.611 14.800 14.800 14.611
4+800.60 14.635 -3.00% -3.00% 14.608 14.797 14.797 14.608
4+802.00 14.632 -3.00% -3.00% 14.605 14.794 14.794 14.605
4+803.40 14.629 -3.00% -3.00% 14.602 14.791 14.791 14.602
4+804.80 14.626 -3.00% -3.00% 14.599 14.788 14.788 14.599
4+806.20 14.623 -3.00% -3.00% 14.596 14.785 14.785 14.596
4+807.60 14.620 -3.00% -3.00% 14.593 14.782 14.782 14.593
4+809.00 14.617 -3.00% -3.00% 14.590 14.779 14.779 14.590
4+810.40 14.615 -3.00% -3.00% 14.588 14.777 14.777 14.588
4+811.80 14.612 -3.00% -3.00% 14.585 14.774 14.774 14.585
4+813.20 14.609 -3.00% -3.00% 14.582 14.771 14.771 14.582
4+814.60 14.606 -3.00% -3.00% 14.579 14.768 14.768 14.579
4+816.00 14.603 -3.00% -3.00% 14.576 14.765 14.765 14.576
4+817.40 14.600 -3.00% -3.00% 14.573 14.762 14.762 14.573
4+818.80 14.597 -3.00% -3.00% 14.570 14.759 14.759 14.570
4+820.20 14.594 -3.00% -3.00% 14.567 14.756 14.756 14.567
4+821.60 14.591 -3.00% -3.00% 14.564 14.753 14.753 14.564
4+823.00 14.588 -3.00% -3.00% 14.561 14.750 14.750 14.561
4+824.40 14.585 -3.00% -3.00% 14.558 14.747 14.747 14.558
4+825.80 14.582 -3.00% -3.00% 14.555 14.744 14.744 14.555
4+827.20 14.579 -3.00% -3.00% 14.552 14.741 14.741 14.552
4+828.60 14.576 -3.00% -3.00% 14.549 14.738 14.738 14.549

115 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+830.00 14.573 -3.00% -3.00% 14.546 14.735 14.735 14.546


4+831.40 14.570 -3.00% -3.00% 14.543 14.732 14.732 14.543
4+832.80 14.567 -3.00% -3.00% 14.540 14.729 14.729 14.540
4+834.20 14.564 -3.00% -3.00% 14.537 14.726 14.726 14.537
4+835.60 14.561 -3.00% -3.00% 14.534 14.723 14.723 14.534
4+837.00 14.558 -3.00% -3.00% 14.531 14.720 14.720 14.531
4+838.40 14.554 -3.00% -3.00% 14.527 14.716 14.716 14.527
4+839.80 14.551 -3.00% -3.00% 14.524 14.713 14.713 14.524
4+841.20 14.547 -3.00% -3.00% 14.520 14.709 14.709 14.520
4+842.60 14.544 -3.00% -3.00% 14.517 14.706 14.706 14.517
4+844.00 14.540 -3.00% -3.00% 14.513 14.702 14.702 14.513
4+845.40 14.536 -3.00% -3.00% 14.509 14.698 14.698 14.509
4+846.80 14.532 -3.00% -3.00% 14.505 14.694 14.694 14.505
4+848.20 14.529 -3.00% -3.00% 14.502 14.691 14.691 14.502
4+849.60 14.525 -3.00% -3.00% 14.498 14.687 14.687 14.498
4+851.00 14.521 -3.00% -3.00% 14.494 14.683 14.683 14.494
4+852.40 14.516 -3.00% -3.00% 14.489 14.678 14.678 14.489
4+853.80 14.512 -3.00% -3.00% 14.485 14.674 14.674 14.485
4+855.20 14.508 -3.00% -3.00% 14.481 14.670 14.670 14.481
4+856.60 14.504 -3.00% -3.00% 14.477 14.666 14.666 14.477
4+858.00 14.499 -3.00% -3.00% 14.472 14.661 14.661 14.472
4+859.40 14.495 -3.00% -3.00% 14.468 14.657 14.657 14.468
4+860.80 14.490 -3.00% -3.00% 14.463 14.652 14.652 14.463
4+862.20 14.486 -3.00% -3.00% 14.459 14.648 14.648 14.459
4+863.60 14.481 -3.00% -3.00% 14.454 14.643 14.643 14.454
4+865.00 14.476 -3.00% -3.00% 14.449 14.638 14.638 14.449
4+866.40 14.471 -3.00% -3.00% 14.444 14.633 14.633 14.444
4+867.80 14.466 -3.00% -3.00% 14.439 14.628 14.628 14.439
4+869.20 14.462 -3.00% -3.00% 14.435 14.624 14.624 14.435
4+870.60 14.456 -3.00% -3.00% 14.429 14.618 14.618 14.429

116 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+872.00 14.451 -3.00% -3.00% 14.424 14.613 14.613 14.424


4+873.40 14.446 -3.00% -3.00% 14.419 14.608 14.608 14.419
4+874.80 14.441 -3.00% -3.00% 14.414 14.603 14.603 14.414
4+876.20 14.435 -3.00% -3.00% 14.408 14.597 14.597 14.408
4+877.60 14.430 -3.00% -3.00% 14.403 14.592 14.592 14.403
4+879.00 14.425 -3.00% -3.00% 14.398 14.587 14.587 14.398
4+880.40 14.419 -3.00% -3.00% 14.392 14.581 14.581 14.392
4+881.80 14.413 -3.00% -3.00% 14.386 14.575 14.575 14.386
4+883.20 14.408 -3.00% -3.00% 14.381 14.570 14.570 14.381
4+884.60 14.402 -3.00% -3.00% 14.375 14.564 14.564 14.375
4+886.00 14.396 -3.00% -3.00% 14.369 14.558 14.558 14.369
4+887.40 14.390 -3.00% -3.00% 14.363 14.552 14.552 14.363
4+888.80 14.384 -3.00% -3.00% 14.357 14.546 14.546 14.357
4+890.20 14.378 -3.00% -3.00% 14.351 14.540 14.540 14.351
4+891.60 14.372 -3.00% -3.00% 14.345 14.534 14.534 14.345
4+893.00 14.366 -3.00% -3.00% 14.339 14.528 14.528 14.339
4+894.40 14.359 -3.00% -3.00% 14.332 14.521 14.521 14.332
4+895.80 14.353 -3.00% -3.00% 14.326 14.515 14.515 14.326
4+897.20 14.347 -3.00% -3.00% 14.320 14.509 14.509 14.320
4+898.60 14.341 -3.00% -3.00% 14.314 14.503 14.503 14.314
4+900.00 14.335 -3.00% -3.00% 14.308 14.497 14.497 14.308
4+901.40 14.329 -3.00% -3.00% 14.302 14.491 14.491 14.302
4+902.80 14.323 -3.00% -3.00% 14.296 14.485 14.485 14.296
4+904.20 14.317 -3.00% -3.00% 14.290 14.479 14.479 14.290
4+905.60 14.310 -3.00% -3.00% 14.283 14.472 14.472 14.283
4+907.00 14.304 -3.00% -3.00% 14.277 14.466 14.466 14.277
4+908.40 14.298 -3.00% -3.00% 14.271 14.460 14.460 14.271
4+909.80 14.292 -3.00% -3.00% 14.265 14.454 14.454 14.265
4+911.20 14.286 -3.00% -3.00% 14.259 14.448 14.448 14.259
4+912.60 14.280 -3.00% -3.00% 14.253 14.442 14.442 14.253

117 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+914.00 14.274 -3.00% -3.00% 14.247 14.436 14.436 14.247


4+915.40 14.268 -3.00% -3.00% 14.241 14.430 14.430 14.241
4+916.80 14.261 -3.00% -3.00% 14.234 14.423 14.423 14.234
4+918.20 14.255 -3.00% -3.00% 14.228 14.417 14.417 14.228
4+919.60 14.249 -3.00% -3.00% 14.222 14.411 14.411 14.222
4+921.00 14.243 -3.00% -3.00% 14.216 14.405 14.405 14.216
4+922.40 14.237 -3.00% -3.00% 14.210 14.399 14.399 14.210
4+923.80 14.231 -3.00% -3.00% 14.204 14.393 14.393 14.204
4+925.20 14.225 -3.00% -3.00% 14.198 14.387 14.387 14.198
4+926.60 14.219 -3.00% -3.00% 14.192 14.381 14.381 14.192
4+928.00 14.212 -3.00% -3.00% 14.185 14.374 14.374 14.185
4+929.40 14.206 -3.00% -3.00% 14.179 14.368 14.368 14.179
4+930.80 14.200 -3.00% -3.00% 14.173 14.362 14.362 14.173
4+932.20 14.194 -3.00% -3.00% 14.167 14.356 14.356 14.167
4+933.60 14.188 -3.00% -3.00% 14.161 14.350 14.350 14.161
4+935.00 14.182 -3.00% -3.00% 14.155 14.344 14.344 14.155
4+936.40 14.176 -3.00% -3.00% 14.149 14.338 14.338 14.149
4+937.80 14.170 -3.00% -3.00% 14.143 14.332 14.332 14.143
4+939.20 14.163 -3.00% -3.00% 14.136 14.325 14.325 14.136
4+940.60 14.157 -3.00% -3.00% 14.130 14.319 14.319 14.130
4+942.00 14.151 -3.00% -3.00% 14.124 14.313 14.313 14.124
4+943.40 14.145 -3.00% -3.00% 14.118 14.307 14.307 14.118
4+944.80 14.139 -3.00% -3.00% 14.112 14.301 14.301 14.112
4+946.20 14.133 -3.00% -3.00% 14.106 14.295 14.295 14.106
4+947.60 14.127 -3.00% -3.00% 14.100 14.289 14.289 14.100
4+949.00 14.121 -3.00% -3.00% 14.094 14.283 14.283 14.094
4+950.40 14.114 -3.00% -3.00% 14.087 14.276 14.276 14.087
4+951.80 14.108 -3.00% -3.00% 14.081 14.270 14.270 14.081
4+953.20 14.102 -3.00% -3.00% 14.075 14.264 14.264 14.075
4+954.60 14.096 -3.00% -3.00% 14.069 14.258 14.258 14.069

118 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+956.00 14.090 -3.00% -3.00% 14.063 14.252 14.252 14.063


4+957.40 14.084 -3.00% -3.00% 14.057 14.246 14.246 14.057
4+958.80 14.078 -3.00% -3.00% 14.051 14.240 14.240 14.051
4+960.20 14.072 -3.00% -3.00% 14.045 14.234 14.234 14.045
4+961.60 14.065 -3.00% -3.00% 14.038 14.227 14.227 14.038
4+963.00 14.059 -3.00% -3.00% 14.032 14.221 14.221 14.032
4+964.40 14.053 -3.00% -3.00% 14.026 14.215 14.215 14.026
4+965.80 14.047 -3.00% -3.00% 14.020 14.209 14.209 14.020
4+967.20 14.041 -3.00% -3.00% 14.014 14.203 14.203 14.014
4+968.60 14.035 -3.00% -3.00% 14.008 14.197 14.197 14.008
4+970.00 14.029 -3.00% -3.00% 14.002 14.191 14.191 14.002
4+971.40 14.023 -3.00% -3.00% 13.996 14.185 14.185 13.996
4+972.80 14.016 -3.00% -3.00% 13.989 14.178 14.178 13.989
4+974.20 14.010 -3.00% -3.00% 13.983 14.172 14.172 13.983
4+975.60 14.004 -3.00% -3.00% 13.977 14.166 14.166 13.977
4+977.00 13.998 -3.00% -3.00% 13.971 14.160 14.160 13.971
4+978.40 13.992 -3.00% -3.00% 13.965 14.154 14.154 13.965
4+979.80 13.986 -3.00% -3.00% 13.959 14.148 14.148 13.959
4+981.20 13.980 -3.00% -3.00% 13.953 14.142 14.142 13.953
4+982.60 13.974 -3.00% -3.00% 13.947 14.136 14.136 13.947
4+984.00 13.967 -3.00% -3.00% 13.940 14.129 14.129 13.940
4+985.40 13.961 -3.00% -3.00% 13.934 14.123 14.123 13.934
4+986.80 13.955 -3.00% -3.00% 13.928 14.117 14.117 13.928
4+988.20 13.949 -3.00% -3.00% 13.922 14.111 14.111 13.922
4+989.60 13.943 -3.00% -3.00% 13.916 14.105 14.105 13.916
4+991.00 13.937 -3.00% -3.00% 13.910 14.099 14.099 13.910
4+992.40 13.931 -3.00% -3.00% 13.904 14.093 14.093 13.904
4+993.80 13.925 -3.00% -3.00% 13.898 14.087 14.087 13.898
4+995.20 13.918 -3.00% -3.00% 13.891 14.080 14.080 13.891
4+996.60 13.912 -3.00% -3.00% 13.885 14.074 14.074 13.885

119 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

4+998.00 13.906 -3.00% -3.00% 13.879 14.068 14.068 13.879


4+999.40 13.900 -3.00% -3.00% 13.873 14.062 14.062 13.873
5+000.80 13.894 -3.00% -3.00% 13.867 14.056 14.056 13.867
5+002.20 13.888 -3.00% -3.00% 13.861 14.050 14.050 13.861
5+003.60 13.882 -3.00% -3.00% 13.855 14.044 14.044 13.855
5+005.00 13.876 -3.00% -3.00% 13.849 14.038 14.038 13.849
5+006.40 13.869 -3.00% -3.00% 13.842 14.031 14.031 13.842
5+007.80 13.863 -3.00% -3.00% 13.836 14.025 14.025 13.836
5+009.20 13.857 -3.00% -3.00% 13.830 14.019 14.019 13.830
5+010.60 13.851 -3.00% -3.00% 13.824 14.013 14.013 13.824
5+012.00 13.845 -3.00% -3.00% 13.818 14.007 14.007 13.818
5+013.40 13.839 -3.00% -3.00% 13.812 14.001 14.001 13.812
5+014.80 13.833 -3.00% -3.00% 13.806 13.995 13.995 13.806
5+016.20 13.827 -3.00% -3.00% 13.800 13.989 13.989 13.800
5+017.60 13.820 -3.00% -3.00% 13.793 13.982 13.982 13.793
5+019.00 13.814 -3.00% -3.00% 13.787 13.976 13.976 13.787
5+020.40 13.808 -3.00% -3.00% 13.781 13.970 13.970 13.781
5+021.80 13.802 -3.00% -3.00% 13.775 13.964 13.964 13.775
5+023.20 13.796 -3.00% -3.00% 13.769 13.958 13.958 13.769
5+024.60 13.790 -3.00% -3.00% 13.763 13.952 13.952 13.763
5+026.00 13.784 -3.00% -3.00% 13.757 13.946 13.946 13.757
5+027.40 13.778 -3.00% -3.00% 13.751 13.940 13.940 13.751
5+028.80 13.771 -3.00% -3.00% 13.744 13.933 13.933 13.744
5+030.20 13.765 -3.00% -3.00% 13.738 13.927 13.927 13.738
5+031.60 13.759 -3.00% -3.00% 13.732 13.921 13.921 13.732
5+033.00 13.753 -3.00% -3.00% 13.726 13.915 13.915 13.726
5+034.40 13.747 -3.00% -3.00% 13.720 13.909 13.909 13.720
5+035.80 13.741 -3.00% -3.00% 13.714 13.903 13.903 13.714
5+037.20 13.735 -3.00% -3.00% 13.708 13.897 13.897 13.708
5+038.60 13.729 -3.00% -3.00% 13.702 13.891 13.891 13.702

120 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+040.00 13.722 -3.00% -3.00% 13.695 13.884 13.884 13.695


5+041.40 13.716 -3.00% -3.00% 13.689 13.878 13.878 13.689
5+042.80 13.710 -3.00% -3.00% 13.683 13.872 13.872 13.683
5+044.20 13.704 -3.00% -3.00% 13.677 13.866 13.866 13.677
5+045.60 13.698 -3.00% -3.00% 13.671 13.860 13.860 13.671
5+047.00 13.692 -3.00% -3.00% 13.665 13.854 13.854 13.665
5+048.40 13.686 -3.00% -3.00% 13.659 13.848 13.848 13.659
5+049.80 13.680 -3.00% -3.00% 13.653 13.842 13.842 13.653
5+051.20 13.673 -3.00% -3.00% 13.646 13.835 13.835 13.646
5+052.60 13.667 -3.00% -3.00% 13.640 13.829 13.829 13.640
5+054.00 13.661 -3.00% -3.00% 13.634 13.823 13.823 13.634
5+055.40 13.655 -3.00% -3.00% 13.628 13.817 13.817 13.628
5+056.80 13.649 -3.00% -3.00% 13.622 13.811 13.811 13.622
5+058.20 13.643 -3.00% -3.00% 13.616 13.805 13.805 13.616
5+059.60 13.637 -3.00% -3.00% 13.610 13.799 13.799 13.610
5+061.00 13.631 -3.00% -3.00% 13.604 13.793 13.793 13.604
5+062.40 13.625 -3.00% -3.00% 13.598 13.787 13.787 13.598
5+063.80 13.619 -3.00% -3.00% 13.592 13.781 13.781 13.592
5+065.20 13.613 -3.00% -3.00% 13.586 13.775 13.775 13.586
5+066.60 13.607 -3.00% -3.00% 13.580 13.769 13.769 13.580
5+068.00 13.601 -3.00% -3.00% 13.574 13.763 13.763 13.574
5+069.40 13.595 -3.00% -3.00% 13.568 13.757 13.757 13.568
5+070.80 13.590 -3.00% -3.00% 13.563 13.752 13.752 13.563
5+072.20 13.584 -3.00% -3.00% 13.557 13.746 13.746 13.557
5+073.60 13.579 -3.00% -3.00% 13.552 13.741 13.741 13.552
5+075.00 13.574 -3.00% -3.00% 13.547 13.736 13.736 13.547
5+076.40 13.568 -3.00% -3.00% 13.541 13.730 13.730 13.541
5+077.80 13.563 -3.00% -3.00% 13.536 13.725 13.725 13.536
5+079.20 13.558 -3.00% -3.00% 13.531 13.720 13.720 13.531
5+080.60 13.553 -3.00% -3.00% 13.526 13.715 13.715 13.526

121 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+082.00 13.548 -3.00% -3.00% 13.521 13.710 13.710 13.521


5+083.40 13.543 -3.00% -3.00% 13.516 13.705 13.705 13.516
5+084.80 13.539 -3.00% -3.00% 13.512 13.701 13.701 13.512
5+086.20 13.534 -3.00% -3.00% 13.507 13.696 13.696 13.507
5+087.60 13.529 -3.00% -3.00% 13.502 13.691 13.691 13.502
5+089.00 13.525 -3.00% -3.00% 13.498 13.687 13.687 13.498
5+090.40 13.520 -3.00% -3.00% 13.493 13.682 13.682 13.493
5+091.80 13.516 -3.00% -3.00% 13.489 13.678 13.678 13.489
5+093.20 13.512 -3.00% -3.00% 13.485 13.674 13.674 13.485
5+094.60 13.507 -3.00% -3.00% 13.480 13.669 13.669 13.480
5+096.00 13.503 -3.00% -3.00% 13.476 13.665 13.665 13.476
5+097.40 13.499 -3.00% -3.00% 13.472 13.661 13.661 13.472
5+098.80 13.495 -3.00% -3.00% 13.468 13.657 13.657 13.468
5+100.20 13.491 -3.00% -3.00% 13.464 13.653 13.653 13.464
5+101.60 13.488 -3.00% -3.00% 13.461 13.650 13.650 13.461
5+103.00 13.484 -3.00% -3.00% 13.457 13.646 13.646 13.457
5+104.40 13.480 -3.00% -3.00% 13.453 13.642 13.642 13.453
5+105.80 13.477 -3.00% -3.00% 13.450 13.639 13.639 13.450
5+107.20 13.473 -3.00% -3.00% 13.446 13.635 13.635 13.446
5+108.60 13.470 -3.00% -3.00% 13.443 13.632 13.632 13.443
5+110.00 13.467 -3.00% -3.00% 13.440 13.629 13.629 13.440
5+111.40 13.463 -3.00% -3.00% 13.436 13.625 13.625 13.436
5+112.80 13.460 -3.00% -3.00% 13.433 13.622 13.622 13.433
5+114.20 13.457 -3.00% -3.00% 13.430 13.619 13.619 13.430
5+115.60 13.454 -3.00% -3.00% 13.427 13.616 13.616 13.427
5+117.00 13.451 -3.00% -3.00% 13.424 13.613 13.613 13.424
5+118.40 13.448 -3.00% -3.00% 13.421 13.610 13.610 13.421
5+119.80 13.446 -3.00% -3.00% 13.419 13.608 13.608 13.419
5+121.20 13.443 -3.00% -3.00% 13.416 13.605 13.605 13.416
5+122.60 13.440 -3.00% -3.00% 13.413 13.602 13.602 13.413

122 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+124.00 13.438 -3.00% -3.00% 13.411 13.600 13.600 13.411


5+125.40 13.435 -3.00% -3.00% 13.408 13.597 13.597 13.408
5+126.80 13.433 -3.00% -3.00% 13.406 13.595 13.595 13.406
5+128.20 13.431 -3.00% -3.00% 13.404 13.593 13.593 13.404
5+129.60 13.429 -3.00% -3.00% 13.402 13.591 13.591 13.402
5+131.00 13.427 -3.00% -3.00% 13.400 13.589 13.589 13.400
5+132.40 13.425 -3.00% -3.00% 13.398 13.587 13.587 13.398
5+133.80 13.423 -3.00% -3.00% 13.396 13.585 13.585 13.396
5+135.20 13.421 -3.00% -3.00% 13.394 13.583 13.583 13.394
5+136.60 13.419 -3.00% -3.00% 13.392 13.581 13.581 13.392
5+138.00 13.417 -3.00% -3.00% 13.390 13.579 13.579 13.390
5+139.40 13.416 -3.00% -3.00% 13.389 13.578 13.578 13.389
5+140.80 13.414 -3.00% -3.00% 13.387 13.576 13.576 13.387
5+142.20 13.413 -3.00% -3.00% 13.386 13.575 13.575 13.386
5+143.60 13.411 -3.00% -3.00% 13.384 13.573 13.573 13.384
5+145.00 13.410 -3.00% -3.00% 13.383 13.572 13.572 13.383
5+146.40 13.409 -3.00% -3.00% 13.382 13.571 13.571 13.382
5+147.80 13.408 -3.00% -3.00% 13.381 13.570 13.570 13.381
5+149.20 13.407 -3.00% -3.00% 13.380 13.569 13.569 13.380
5+150.60 13.406 -3.00% -3.00% 13.379 13.568 13.568 13.379
5+152.00 13.405 -3.00% -3.00% 13.378 13.567 13.567 13.378
5+153.40 13.404 -3.00% -3.00% 13.377 13.566 13.566 13.377
5+154.80 13.403 -3.00% -3.00% 13.376 13.565 13.565 13.376
5+156.20 13.403 -3.00% -3.00% 13.376 13.565 13.565 13.376
5+157.60 13.402 -3.00% -3.00% 13.375 13.564 13.564 13.375
5+159.00 13.402 -3.00% -3.00% 13.375 13.564 13.564 13.375
5+160.40 13.401 -3.00% -3.00% 13.374 13.563 13.563 13.374
5+161.80 13.401 -3.00% -3.00% 13.374 13.563 13.563 13.374
5+163.20 13.401 -3.00% -3.00% 13.374 13.563 13.563 13.374
5+164.60 13.401 -3.00% -3.00% 13.374 13.563 13.563 13.374

123 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+166.00 13.400 -3.00% -3.00% 13.373 13.562 13.562 13.373


5+167.40 13.400 -3.00% -3.00% 13.373 13.562 13.562 13.373
5+168.80 13.401 -3.00% -3.00% 13.374 13.563 13.563 13.374
5+170.20 13.401 -3.00% -3.00% 13.374 13.563 13.563 13.374
5+171.60 13.401 -3.00% -3.00% 13.374 13.563 13.563 13.374
5+173.00 13.401 -3.00% -3.00% 13.374 13.563 13.563 13.374
5+174.40 13.402 -3.00% -3.00% 13.375 13.564 13.564 13.375
5+175.80 13.402 -3.00% -3.00% 13.375 13.564 13.564 13.375
5+177.20 13.403 -3.00% -3.00% 13.376 13.565 13.565 13.376
5+178.60 13.403 -3.00% -3.00% 13.376 13.565 13.565 13.376
5+180.00 13.404 -3.00% -3.00% 13.377 13.566 13.566 13.377
5+181.40 13.405 -3.00% -3.00% 13.378 13.567 13.567 13.378
5+182.80 13.406 -3.00% -3.00% 13.379 13.568 13.568 13.379
5+184.20 13.407 -3.00% -3.00% 13.380 13.569 13.569 13.380
5+185.60 13.408 -3.00% -3.00% 13.381 13.570 13.570 13.381
5+187.00 13.409 -3.00% -3.00% 13.382 13.571 13.571 13.382
5+188.40 13.410 -3.00% -3.00% 13.383 13.572 13.572 13.383
5+189.80 13.412 -3.00% -3.00% 13.385 13.574 13.574 13.385
5+191.20 13.413 -3.00% -3.00% 13.386 13.575 13.575 13.386
5+192.60 13.414 -3.00% -3.00% 13.387 13.576 13.576 13.387
5+194.00 13.416 -3.00% -3.00% 13.389 13.578 13.578 13.389
5+195.40 13.418 -3.00% -3.00% 13.391 13.580 13.580 13.391
5+196.80 13.419 -3.00% -3.00% 13.392 13.581 13.581 13.392
5+198.20 13.421 -3.00% -3.00% 13.394 13.583 13.583 13.394
5+199.60 13.423 -3.00% -3.00% 13.396 13.585 13.585 13.396
5+201.00 13.425 -3.00% -3.00% 13.398 13.587 13.587 13.398
5+202.40 13.427 -3.00% -3.00% 13.400 13.589 13.589 13.400
5+203.80 13.429 -3.00% -3.00% 13.402 13.591 13.591 13.402
5+205.20 13.431 -3.00% -3.00% 13.404 13.593 13.593 13.404
5+206.60 13.433 -3.00% -3.00% 13.406 13.595 13.595 13.406

124 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+208.00 13.436 -3.00% -3.00% 13.409 13.598 13.598 13.409


5+209.40 13.438 -3.00% -3.00% 13.411 13.600 13.600 13.411
5+210.80 13.441 -3.00% -3.00% 13.414 13.603 13.603 13.414
5+212.20 13.443 -3.00% -3.00% 13.416 13.605 13.605 13.416
5+213.60 13.446 -3.00% -3.00% 13.419 13.608 13.608 13.419
5+215.00 13.449 -3.00% -3.00% 13.422 13.611 13.611 13.422
5+216.40 13.452 -3.00% -3.00% 13.425 13.614 13.614 13.425
5+217.80 13.455 -3.00% -3.00% 13.428 13.617 13.617 13.428
5+219.20 13.458 -3.00% -3.00% 13.431 13.620 13.620 13.431
5+220.60 13.461 -3.00% -3.00% 13.434 13.623 13.623 13.434
5+222.00 13.464 -3.00% -3.00% 13.437 13.626 13.626 13.437
5+223.40 13.467 -3.00% -3.00% 13.440 13.629 13.629 13.440
5+224.80 13.470 -3.00% -3.00% 13.443 13.632 13.632 13.443
5+226.20 13.473 -3.00% -3.00% 13.446 13.635 13.635 13.446
5+227.60 13.476 -3.00% -3.00% 13.449 13.638 13.638 13.449
5+229.00 13.479 -3.00% -3.00% 13.452 13.641 13.641 13.452
5+230.40 13.483 -3.00% -3.00% 13.456 13.645 13.645 13.456
5+231.80 13.486 -3.00% -3.00% 13.459 13.648 13.648 13.459
5+233.20 13.489 -3.00% -3.00% 13.462 13.651 13.651 13.462
5+234.60 13.492 -3.00% -3.00% 13.465 13.654 13.654 13.465
5+236.00 13.495 -3.00% -3.00% 13.468 13.657 13.657 13.468
5+237.40 13.498 -3.00% -3.00% 13.471 13.660 13.660 13.471
5+238.80 13.501 -3.00% -3.00% 13.474 13.663 13.663 13.474
5+240.20 13.504 -3.00% -3.00% 13.477 13.666 13.666 13.477
5+241.60 13.508 -3.00% -3.00% 13.481 13.670 13.670 13.481
5+243.00 13.511 -3.00% -3.00% 13.484 13.673 13.673 13.484
5+244.40 13.514 -3.00% -3.00% 13.487 13.676 13.676 13.487
5+245.80 13.517 -3.00% -3.00% 13.490 13.679 13.679 13.490
5+247.20 13.520 -3.00% -3.00% 13.493 13.682 13.682 13.493
5+248.60 13.523 -3.00% -3.00% 13.496 13.685 13.685 13.496

125 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+250.00 13.526 -3.00% -3.00% 13.499 13.688 13.688 13.499


5+251.40 13.530 -3.00% -3.00% 13.503 13.692 13.692 13.503
5+252.80 13.533 -3.00% -3.00% 13.506 13.695 13.695 13.506
5+254.20 13.536 -3.00% -3.00% 13.509 13.698 13.698 13.509
5+255.60 13.539 -3.00% -3.00% 13.512 13.701 13.701 13.512
5+257.00 13.542 -3.00% -3.00% 13.515 13.704 13.704 13.515
5+258.40 13.545 -3.00% -3.00% 13.518 13.707 13.707 13.518
5+259.80 13.548 -3.00% -3.00% 13.521 13.710 13.710 13.521
5+261.20 13.551 -3.00% -3.00% 13.524 13.713 13.713 13.524
5+262.60 13.555 -3.00% -3.00% 13.528 13.717 13.717 13.528
5+264.00 13.558 -3.00% -3.00% 13.531 13.720 13.720 13.531
5+265.40 13.561 -3.00% -3.00% 13.534 13.723 13.723 13.534
5+266.80 13.564 -3.00% -3.00% 13.537 13.726 13.726 13.537
5+268.20 13.567 -3.00% -3.00% 13.540 13.729 13.729 13.540
5+269.60 13.570 -3.00% -3.00% 13.543 13.732 13.732 13.543
5+271.00 13.573 -3.00% -3.00% 13.546 13.735 13.735 13.546
5+272.40 13.577 -3.00% -3.00% 13.550 13.739 13.739 13.550
5+273.80 13.580 -3.00% -3.00% 13.553 13.742 13.742 13.553
5+275.20 13.583 -3.00% -3.00% 13.556 13.745 13.745 13.556
5+276.60 13.586 -3.00% -3.00% 13.559 13.748 13.748 13.559
5+278.00 13.589 -3.00% -3.00% 13.562 13.751 13.751 13.562
5+279.40 13.592 -3.00% -3.00% 13.565 13.754 13.754 13.565
5+280.80 13.595 -3.00% -3.00% 13.568 13.757 13.757 13.568
5+282.20 13.598 -3.00% -3.00% 13.571 13.760 13.760 13.571
5+283.60 13.602 -3.00% -3.00% 13.575 13.764 13.764 13.575
5+285.00 13.605 -3.00% -3.00% 13.578 13.767 13.767 13.578
5+286.40 13.608 -3.00% -3.00% 13.581 13.770 13.770 13.581
5+287.80 13.611 -3.00% -3.00% 13.584 13.773 13.773 13.584
5+289.20 13.614 -3.00% -3.00% 13.587 13.776 13.776 13.587
5+290.60 13.617 -3.00% -3.00% 13.590 13.779 13.779 13.590

126 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+292.00 13.620 -3.00% -3.00% 13.593 13.782 13.782 13.593


5+293.40 13.624 -3.00% -3.00% 13.597 13.786 13.786 13.597
5+294.80 13.627 -3.00% -3.00% 13.600 13.789 13.789 13.600
5+296.20 13.630 -3.00% -3.00% 13.603 13.792 13.792 13.603
5+297.60 13.633 -3.00% -3.00% 13.606 13.795 13.795 13.606
5+299.00 13.636 -3.00% -3.00% 13.609 13.798 13.798 13.609
5+300.40 13.639 -3.00% -3.00% 13.612 13.801 13.801 13.612
5+301.80 13.642 -3.00% -3.00% 13.615 13.804 13.804 13.615
5+303.20 13.645 -3.00% -3.00% 13.618 13.807 13.807 13.618
5+304.60 13.649 -3.00% -3.00% 13.622 13.811 13.811 13.622
5+306.00 13.652 -3.00% -3.00% 13.625 13.814 13.814 13.625
5+307.40 13.655 -3.00% -3.00% 13.628 13.817 13.817 13.628
5+308.80 13.658 -3.00% -3.00% 13.631 13.820 13.820 13.631
5+310.20 13.661 -3.00% -3.00% 13.634 13.823 13.823 13.634
5+311.60 13.664 -3.00% -3.00% 13.637 13.826 13.826 13.637
5+313.00 13.667 -3.00% -3.00% 13.640 13.829 13.829 13.640
5+314.40 13.670 -3.00% -3.00% 13.643 13.832 13.832 13.643
5+315.80 13.674 -3.00% -3.00% 13.647 13.836 13.836 13.647
5+317.20 13.677 -3.00% -3.00% 13.650 13.839 13.839 13.650
5+318.60 13.680 -3.00% -3.00% 13.653 13.842 13.842 13.653
5+320.00 13.683 -3.00% -3.00% 13.656 13.845 13.845 13.656
5+321.40 13.686 -3.00% -3.00% 13.659 13.848 13.848 13.659
5+322.80 13.689 -3.00% -3.00% 13.662 13.851 13.851 13.662
5+324.20 13.692 -3.00% -3.00% 13.665 13.854 13.854 13.665
5+325.60 13.696 -3.00% -3.00% 13.669 13.858 13.858 13.669
5+327.00 13.699 -3.00% -3.00% 13.672 13.861 13.861 13.672
5+328.40 13.702 -3.00% -3.00% 13.675 13.864 13.864 13.675
5+329.80 13.705 -3.00% -3.00% 13.678 13.867 13.867 13.678
5+331.20 13.708 -3.00% -3.00% 13.681 13.870 13.870 13.681
5+332.60 13.711 -3.00% -3.00% 13.684 13.873 13.873 13.684

127 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+334.00 13.714 -3.00% -3.00% 13.687 13.876 13.876 13.687


5+335.40 13.717 -3.00% -3.00% 13.690 13.879 13.879 13.690
5+336.80 13.721 -3.00% -3.00% 13.694 13.883 13.883 13.694
5+338.20 13.724 -3.00% -3.00% 13.697 13.886 13.886 13.697
5+339.60 13.727 -3.00% -3.00% 13.700 13.889 13.889 13.700
5+341.00 13.730 -3.00% -3.00% 13.703 13.892 13.892 13.703
5+342.40 13.733 -3.00% -3.00% 13.706 13.895 13.895 13.706
5+343.80 13.736 -3.00% -3.00% 13.709 13.898 13.898 13.709
5+345.20 13.739 -3.00% -3.00% 13.712 13.901 13.901 13.712
5+346.60 13.743 -3.00% -3.00% 13.716 13.905 13.905 13.716
5+348.00 13.746 -3.00% -3.00% 13.719 13.908 13.908 13.719
5+349.40 13.749 -3.00% -3.00% 13.722 13.911 13.911 13.722
5+350.80 13.752 -3.00% -3.00% 13.725 13.914 13.914 13.725
5+352.20 13.755 -3.00% -3.00% 13.728 13.917 13.917 13.728
5+353.60 13.758 -3.00% -3.00% 13.731 13.920 13.920 13.731
5+355.00 13.761 -3.00% -3.00% 13.734 13.923 13.923 13.734
5+356.40 13.764 -3.00% -3.00% 13.737 13.926 13.926 13.737
5+357.80 13.768 -3.00% -3.00% 13.741 13.930 13.930 13.741
5+359.20 13.771 -3.00% -3.00% 13.744 13.933 13.933 13.744
5+360.60 13.774 -3.00% -3.00% 13.747 13.936 13.936 13.747
5+362.00 13.777 -3.00% -3.00% 13.750 13.939 13.939 13.750
5+363.40 13.780 -3.00% -3.00% 13.753 13.942 13.942 13.753
5+364.80 13.783 -3.00% -3.00% 13.756 13.945 13.945 13.756
5+366.20 13.786 -3.00% -3.00% 13.759 13.948 13.948 13.759
5+367.60 13.790 -3.00% -3.00% 13.763 13.952 13.952 13.763
5+369.00 13.793 -3.00% -3.00% 13.766 13.955 13.955 13.766
5+370.40 13.796 -3.00% -3.00% 13.769 13.958 13.958 13.769
5+371.80 13.799 -3.00% -3.00% 13.772 13.961 13.961 13.772
5+373.20 13.802 -3.00% -3.00% 13.775 13.964 13.964 13.775
5+374.60 13.805 -3.00% -3.00% 13.778 13.967 13.967 13.778

128 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+376.00 13.808 -3.00% -3.00% 13.781 13.970 13.970 13.781


5+377.40 13.811 -3.00% -3.00% 13.784 13.973 13.973 13.784
5+378.80 13.815 -3.00% -3.00% 13.788 13.977 13.977 13.788
5+380.20 13.818 -3.00% -3.00% 13.791 13.980 13.980 13.791
5+381.60 13.821 -3.00% -3.00% 13.794 13.983 13.983 13.794
5+383.00 13.824 -3.00% -3.00% 13.797 13.986 13.986 13.797
5+384.40 13.827 -3.00% -3.00% 13.800 13.989 13.989 13.800
5+385.80 13.830 -3.00% -3.00% 13.803 13.992 13.992 13.803
5+387.20 13.833 -3.00% -3.00% 13.806 13.995 13.995 13.806
5+388.60 13.837 -3.00% -3.00% 13.810 13.999 13.999 13.810
5+390.00 13.840 -3.00% -3.00% 13.813 14.002 14.002 13.813
5+391.40 13.843 -3.00% -3.00% 13.816 14.005 14.005 13.816
5+392.80 13.846 -3.00% -3.00% 13.819 14.008 14.008 13.819
5+394.20 13.849 -3.00% -3.00% 13.822 14.011 14.011 13.822
5+395.60 13.852 -3.00% -3.00% 13.825 14.014 14.014 13.825
5+397.00 13.855 -3.00% -3.00% 13.828 14.017 14.017 13.828
5+398.40 13.858 -3.00% -3.00% 13.831 14.020 14.020 13.831
5+399.80 13.862 -3.00% -3.00% 13.835 14.024 14.024 13.835
5+401.20 13.865 -3.00% -3.00% 13.838 14.027 14.027 13.838
5+402.60 13.868 -3.00% -3.00% 13.841 14.030 14.030 13.841
5+404.00 13.871 -3.00% -3.00% 13.844 14.033 14.033 13.844
5+405.40 13.874 -3.00% -3.00% 13.847 14.036 14.036 13.847
5+406.80 13.877 -3.00% -3.00% 13.850 14.039 14.039 13.850
5+408.20 13.880 -3.00% -3.00% 13.853 14.042 14.042 13.853
5+409.60 13.883 -3.00% -3.00% 13.856 14.045 14.045 13.856
5+411.00 13.887 -3.00% -3.00% 13.860 14.049 14.049 13.860
5+412.40 13.890 -3.00% -3.00% 13.863 14.052 14.052 13.863
5+413.80 13.893 -3.00% -3.00% 13.866 14.055 14.055 13.866
5+415.20 13.896 -3.00% -3.00% 13.869 14.058 14.058 13.869
5+416.60 13.899 -3.00% -3.00% 13.872 14.061 14.061 13.872

129 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+418.00 13.902 -3.00% -3.00% 13.875 14.064 14.064 13.875


5+419.40 13.905 -3.00% -3.00% 13.878 14.067 14.067 13.878
5+420.80 13.909 -3.00% -3.00% 13.882 14.071 14.071 13.882
5+422.20 13.912 -3.00% -3.00% 13.885 14.074 14.074 13.885
5+423.60 13.915 -3.00% -3.00% 13.888 14.077 14.077 13.888
5+425.00 13.918 -3.00% -3.00% 13.891 14.080 14.080 13.891
5+426.40 13.921 -3.00% -3.00% 13.894 14.083 14.083 13.894
5+427.80 13.924 -3.00% -3.00% 13.897 14.086 14.086 13.897
5+429.20 13.927 -3.00% -3.00% 13.900 14.089 14.089 13.900
5+430.60 13.930 -3.00% -3.00% 13.903 14.092 14.092 13.903
5+432.00 13.934 -3.00% -3.00% 13.907 14.096 14.096 13.907
5+433.40 13.937 -3.00% -3.00% 13.910 14.099 14.099 13.910
5+434.80 13.940 -3.00% -3.00% 13.913 14.102 14.102 13.913
5+436.20 13.943 -3.00% -3.00% 13.916 14.105 14.105 13.916
5+437.60 13.946 -3.00% -3.00% 13.919 14.108 14.108 13.919
5+439.00 13.949 -3.00% -3.00% 13.922 14.111 14.111 13.922
5+440.40 13.952 -3.00% -3.00% 13.925 14.114 14.114 13.925
5+441.80 13.956 -3.00% -3.00% 13.929 14.118 14.118 13.929
5+443.20 13.959 -3.00% -3.00% 13.932 14.121 14.121 13.932
5+444.60 13.962 -3.00% -3.00% 13.935 14.124 14.124 13.935
5+446.00 13.965 -3.00% -3.00% 13.938 14.127 14.127 13.938
5+447.40 13.968 -3.00% -3.00% 13.941 14.130 14.130 13.941
5+448.80 13.971 -3.00% -3.00% 13.944 14.133 14.133 13.944
5+450.20 13.974 -3.00% -3.00% 13.947 14.136 14.136 13.947
5+451.60 13.977 -3.00% -3.00% 13.950 14.139 14.139 13.950
5+453.00 13.981 -3.00% -3.00% 13.954 14.143 14.143 13.954
5+454.40 13.984 -3.00% -3.00% 13.957 14.146 14.146 13.957
5+455.80 13.987 -3.00% -3.00% 13.960 14.149 14.149 13.960
5+457.20 13.990 -3.00% -3.00% 13.963 14.152 14.152 13.963
5+458.60 13.993 -3.00% -3.00% 13.966 14.155 14.155 13.966

130 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+460.00 13.996 -3.00% -3.00% 13.969 14.158 14.158 13.969


5+461.40 13.999 -3.00% -3.00% 13.972 14.161 14.161 13.972
5+462.80 14.003 -3.00% -3.00% 13.976 14.165 14.165 13.976
5+464.20 14.006 -3.00% -3.00% 13.979 14.168 14.168 13.979
5+465.60 14.009 -3.00% -3.00% 13.982 14.171 14.171 13.982
5+467.00 14.012 -3.00% -3.00% 13.985 14.174 14.174 13.985
5+468.40 14.015 -3.00% -3.00% 13.988 14.177 14.177 13.988
5+469.80 14.018 -3.00% -3.00% 13.991 14.180 14.180 13.991
5+471.20 14.021 -3.00% -3.00% 13.994 14.183 14.183 13.994
5+472.60 14.024 -3.00% -3.00% 13.997 14.186 14.186 13.997
5+474.00 14.028 -3.00% -3.00% 14.001 14.190 14.190 14.001
5+475.40 14.031 -3.00% -3.00% 14.004 14.193 14.193 14.004
5+476.80 14.034 -3.00% -3.00% 14.007 14.196 14.196 14.007
5+478.20 14.037 -3.00% -3.00% 14.010 14.199 14.199 14.010
5+479.60 14.040 -3.00% -3.00% 14.013 14.202 14.202 14.013
5+481.00 14.043 -3.00% -3.00% 14.016 14.205 14.205 14.016
5+482.40 14.046 -3.00% -3.00% 14.019 14.208 14.208 14.019
5+483.80 14.050 -3.00% -3.00% 14.023 14.212 14.212 14.023
5+485.20 14.053 -3.00% -3.00% 14.026 14.215 14.215 14.026
5+486.60 14.056 -3.00% -3.00% 14.029 14.218 14.218 14.029
5+488.00 14.059 -3.00% -3.00% 14.032 14.221 14.221 14.032
5+489.40 14.062 -3.00% -3.00% 14.035 14.224 14.224 14.035
5+490.80 14.065 -3.00% -3.00% 14.038 14.227 14.227 14.038
5+492.20 14.068 -3.00% -3.00% 14.041 14.230 14.230 14.041
5+493.60 14.071 -3.00% -3.00% 14.044 14.233 14.233 14.044
5+495.00 14.075 -3.00% -3.00% 14.048 14.237 14.237 14.048
5+496.40 14.078 -3.00% -3.00% 14.051 14.240 14.240 14.051
5+497.80 14.081 -3.00% -3.00% 14.054 14.243 14.243 14.054
5+499.20 14.084 -3.00% -3.00% 14.057 14.246 14.246 14.057
5+500.60 14.087 -3.00% -3.00% 14.060 14.249 14.249 14.060

131 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+502.00 14.090 -3.00% -3.00% 14.063 14.252 14.252 14.063


5+503.40 14.093 -3.00% -3.00% 14.066 14.255 14.255 14.066
5+504.80 14.096 -3.00% -3.00% 14.069 14.258 14.258 14.069
5+506.20 14.100 -3.00% -3.00% 14.073 14.262 14.262 14.073
5+507.60 14.103 -3.00% -3.00% 14.076 14.265 14.265 14.076
5+509.00 14.106 -3.00% -3.00% 14.079 14.268 14.268 14.079
5+510.40 14.109 -3.00% -3.00% 14.082 14.271 14.271 14.082
5+511.80 14.112 -3.00% -3.00% 14.085 14.274 14.274 14.085
5+513.20 14.115 -3.00% -3.00% 14.088 14.277 14.277 14.088
5+514.60 14.118 -3.00% -3.00% 14.091 14.280 14.280 14.091
5+516.00 14.122 -3.00% -3.00% 14.095 14.284 14.284 14.095
5+517.40 14.125 -3.00% -3.00% 14.098 14.287 14.287 14.098
5+518.80 14.128 -3.00% -3.00% 14.101 14.290 14.290 14.101
5+520.20 14.131 -3.00% -3.00% 14.104 14.293 14.293 14.104
5+521.60 14.134 -3.00% -3.00% 14.107 14.296 14.296 14.107
5+523.00 14.137 -3.00% -3.00% 14.110 14.299 14.299 14.110
5+524.40 14.140 -3.00% -3.00% 14.113 14.302 14.302 14.113
5+525.80 14.143 -3.00% -3.00% 14.116 14.305 14.305 14.116
5+527.20 14.147 -3.00% -3.00% 14.120 14.309 14.309 14.120
5+528.60 14.150 -3.00% -3.00% 14.123 14.312 14.312 14.123
5+530.00 14.153 -3.00% -3.00% 14.126 14.315 14.315 14.126
5+531.40 14.156 -3.00% -3.00% 14.129 14.318 14.318 14.129
5+532.80 14.159 -3.00% -3.00% 14.132 14.321 14.321 14.132
5+534.20 14.162 -3.00% -3.00% 14.135 14.324 14.324 14.135
5+535.60 14.165 -3.00% -3.00% 14.138 14.327 14.327 14.138
5+537.00 14.169 -3.00% -3.00% 14.142 14.331 14.331 14.142
5+538.40 14.172 -3.00% -3.00% 14.145 14.334 14.334 14.145
5+539.80 14.175 -3.00% -3.00% 14.148 14.337 14.337 14.148
5+541.20 14.178 -3.00% -3.00% 14.151 14.340 14.340 14.151
5+542.60 14.181 -3.00% -3.00% 14.154 14.343 14.343 14.154

132 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+544.00 14.184 -3.00% -3.00% 14.157 14.346 14.346 14.157


5+545.40 14.187 -3.00% -3.00% 14.160 14.349 14.349 14.160
5+546.80 14.190 -3.00% -3.00% 14.163 14.352 14.352 14.163
5+548.20 14.194 -3.00% -3.00% 14.167 14.356 14.356 14.167
5+549.60 14.197 -3.00% -3.00% 14.170 14.359 14.359 14.170
5+551.00 14.200 -3.00% -3.00% 14.173 14.362 14.362 14.173
5+552.40 14.203 -3.00% -3.00% 14.176 14.365 14.365 14.176
5+553.80 14.206 -3.00% -3.00% 14.179 14.368 14.368 14.179
5+555.20 14.209 -3.00% -3.00% 14.182 14.371 14.371 14.182
5+556.60 14.212 -3.00% -3.00% 14.185 14.374 14.374 14.185
5+558.00 14.216 -3.00% -3.00% 14.189 14.378 14.378 14.189
5+559.40 14.219 -3.00% -3.00% 14.192 14.381 14.381 14.192
5+560.80 14.222 -3.00% -3.00% 14.195 14.384 14.384 14.195
5+562.20 14.225 -3.00% -3.00% 14.198 14.387 14.387 14.198
5+563.60 14.228 -3.00% -3.00% 14.201 14.390 14.390 14.201
5+565.00 14.231 -3.00% -3.00% 14.204 14.393 14.393 14.204
5+566.40 14.234 -3.00% -3.00% 14.207 14.396 14.396 14.207
5+567.80 14.237 -3.00% -3.00% 14.210 14.399 14.399 14.210
5+569.20 14.241 -3.00% -3.00% 14.214 14.403 14.403 14.214
5+570.60 14.244 -3.00% -3.00% 14.217 14.406 14.406 14.217
5+572.00 14.247 -3.00% -3.00% 14.220 14.409 14.409 14.220
5+573.40 14.250 -3.00% -3.00% 14.223 14.412 14.412 14.223
5+574.80 14.253 -3.00% -3.00% 14.226 14.415 14.415 14.226
5+576.20 14.256 -3.00% -3.00% 14.229 14.418 14.418 14.229
5+577.60 14.259 -3.00% -3.00% 14.232 14.421 14.421 14.232
5+579.00 14.262 -3.00% -3.00% 14.235 14.424 14.424 14.235
5+580.40 14.266 -3.00% -3.00% 14.239 14.428 14.428 14.239
5+581.80 14.269 -3.00% -3.00% 14.242 14.431 14.431 14.242
5+583.20 14.272 -3.00% -3.00% 14.245 14.434 14.434 14.245
5+584.60 14.275 -3.00% -3.00% 14.248 14.437 14.437 14.248

133 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+586.00 14.278 -3.00% -3.00% 14.251 14.440 14.440 14.251


5+587.40 14.281 -3.00% -3.00% 14.254 14.443 14.443 14.254
5+588.80 14.284 -3.00% -3.00% 14.257 14.446 14.446 14.257
5+590.20 14.288 -3.00% -3.00% 14.261 14.450 14.450 14.261
5+591.60 14.291 -3.00% -3.00% 14.264 14.453 14.453 14.264
5+593.00 14.294 -3.00% -3.00% 14.267 14.456 14.456 14.267
5+594.40 14.297 -3.00% -3.00% 14.270 14.459 14.459 14.270
5+595.80 14.300 -3.00% -3.00% 14.273 14.462 14.462 14.273
5+597.20 14.303 -3.00% -3.00% 14.276 14.465 14.465 14.276
5+598.60 14.306 -3.00% -3.00% 14.279 14.468 14.468 14.279
5+600.00 14.309 -3.00% -3.00% 14.282 14.471 14.471 14.282
5+601.40 14.313 -3.00% -3.00% 14.286 14.475 14.475 14.286
5+602.80 14.316 -3.00% -3.00% 14.289 14.478 14.478 14.289
5+604.20 14.319 -3.00% -3.00% 14.292 14.481 14.481 14.292
5+605.60 14.322 -3.00% -3.00% 14.295 14.484 14.484 14.295
5+607.00 14.325 -3.00% -3.00% 14.298 14.487 14.487 14.298
5+608.40 14.328 -3.00% -3.00% 14.301 14.490 14.490 14.301
5+609.80 14.331 -3.00% -3.00% 14.304 14.493 14.493 14.304
5+611.20 14.334 -3.00% -3.00% 14.307 14.496 14.496 14.307
5+612.60 14.337 -3.00% -3.00% 14.310 14.499 14.499 14.310
5+614.00 14.339 -3.00% -3.00% 14.312 14.501 14.501 14.312
5+615.40 14.342 -3.00% -3.00% 14.315 14.504 14.504 14.315
5+616.80 14.345 -3.00% -3.00% 14.318 14.507 14.507 14.318
5+618.20 14.348 -3.00% -3.00% 14.321 14.510 14.510 14.321
5+619.60 14.350 -3.00% -3.00% 14.323 14.512 14.512 14.323
5+621.00 14.353 -3.00% -3.00% 14.326 14.515 14.515 14.326
5+622.40 14.355 -3.00% -3.00% 14.328 14.517 14.517 14.328
5+623.80 14.358 -3.00% -3.00% 14.331 14.520 14.520 14.331
5+625.20 14.361 -3.00% -3.00% 14.334 14.523 14.523 14.334
5+626.60 14.363 -3.00% -3.00% 14.336 14.525 14.525 14.336

134 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+628.00 14.365 -3.00% -3.00% 14.338 14.527 14.527 14.338


5+629.40 14.368 -3.00% -3.00% 14.341 14.530 14.530 14.341
5+630.80 14.370 -3.00% -3.00% 14.343 14.532 14.532 14.343
5+632.20 14.373 -3.00% -3.00% 14.346 14.535 14.535 14.346
5+633.60 14.375 -3.00% -3.00% 14.348 14.537 14.537 14.348
5+635.00 14.377 -3.00% -3.00% 14.350 14.539 14.539 14.350
5+636.40 14.379 -3.00% -3.00% 14.352 14.541 14.541 14.352
5+637.80 14.382 -3.00% -3.00% 14.355 14.544 14.544 14.355
5+639.20 14.384 -3.00% -3.00% 14.357 14.546 14.546 14.357
5+640.60 14.386 -3.00% -3.00% 14.359 14.548 14.548 14.359
5+642.00 14.388 -3.00% -3.00% 14.361 14.550 14.550 14.361
5+643.40 14.390 -3.00% -3.00% 14.363 14.552 14.552 14.363
5+644.80 14.392 -3.00% -3.00% 14.365 14.554 14.554 14.365
5+646.20 14.394 -3.00% -3.00% 14.367 14.556 14.556 14.367
5+647.60 14.396 -3.00% -3.00% 14.369 14.558 14.558 14.369
5+649.00 14.398 -3.00% -3.00% 14.371 14.560 14.560 14.371
5+650.40 14.400 -3.00% -3.00% 14.373 14.562 14.562 14.373
5+651.80 14.401 -3.00% -3.00% 14.374 14.563 14.563 14.374
5+653.20 14.403 -3.00% -3.00% 14.376 14.565 14.565 14.376
5+654.60 14.405 -3.00% -3.00% 14.378 14.567 14.567 14.378
5+656.00 14.407 -3.00% -3.00% 14.380 14.569 14.569 14.380
5+657.40 14.408 -3.00% -3.00% 14.381 14.570 14.570 14.381
5+658.80 14.410 -3.00% -3.00% 14.383 14.572 14.572 14.383
5+660.20 14.411 -3.00% -3.00% 14.384 14.573 14.573 14.384
5+661.60 14.413 -3.00% -3.00% 14.386 14.575 14.575 14.386
5+663.00 14.415 -3.00% -3.00% 14.388 14.577 14.577 14.388
5+664.40 14.416 -3.00% -3.00% 14.389 14.578 14.578 14.389
5+665.80 14.418 -3.00% -3.00% 14.391 14.580 14.580 14.391
5+667.20 14.419 -3.00% -3.00% 14.392 14.581 14.581 14.392
5+668.60 14.421 -3.00% -3.00% 14.394 14.583 14.583 14.394

135 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+670.00 14.422 -3.00% -3.00% 14.395 14.584 14.584 14.395


5+671.40 14.424 -3.00% -3.00% 14.397 14.586 14.586 14.397
5+672.80 14.425 -3.00% -3.00% 14.398 14.587 14.587 14.398
5+674.20 14.427 -3.00% -3.00% 14.400 14.589 14.589 14.400
5+675.60 14.428 -3.00% -3.00% 14.401 14.590 14.590 14.401
5+677.00 14.430 -3.00% -3.00% 14.403 14.592 14.592 14.403
5+678.40 14.431 -3.00% -3.00% 14.404 14.593 14.593 14.404
5+679.80 14.433 -3.00% -3.00% 14.406 14.595 14.595 14.406
5+681.20 14.435 -3.00% -3.00% 14.408 14.597 14.597 14.408
5+682.60 14.436 -3.00% -3.00% 14.409 14.598 14.598 14.409
5+684.00 14.438 -3.00% -3.00% 14.411 14.600 14.600 14.411
5+685.40 14.439 -3.00% -3.00% 14.412 14.601 14.601 14.412
5+686.80 14.441 -3.00% -3.00% 14.414 14.603 14.603 14.414
5+688.20 14.442 -3.00% -3.00% 14.415 14.604 14.604 14.415
5+689.60 14.444 -3.00% -3.00% 14.417 14.606 14.606 14.417
5+691.00 14.445 -3.00% -3.00% 14.418 14.607 14.607 14.418
5+692.40 14.447 -3.00% -3.00% 14.420 14.609 14.609 14.420
5+693.80 14.448 -3.00% -3.00% 14.421 14.610 14.610 14.421
5+695.20 14.450 -3.00% -3.00% 14.423 14.612 14.612 14.423
5+696.60 14.451 -3.00% -3.00% 14.424 14.613 14.613 14.424
5+698.00 14.453 -3.00% -3.00% 14.426 14.615 14.615 14.426
5+699.40 14.454 -3.00% -3.00% 14.427 14.616 14.616 14.427
5+700.80 14.456 -3.00% -3.00% 14.429 14.618 14.618 14.429
5+702.20 14.458 -3.00% -3.00% 14.431 14.620 14.620 14.431
5+703.60 14.459 -3.00% -3.00% 14.432 14.621 14.621 14.432
5+705.00 14.461 -3.00% -3.00% 14.434 14.623 14.623 14.434
5+706.40 14.462 -3.00% -3.00% 14.435 14.624 14.624 14.435
5+707.80 14.464 -3.00% -3.00% 14.437 14.626 14.626 14.437
5+709.20 14.465 -3.00% -3.00% 14.438 14.627 14.627 14.438
5+710.60 14.467 -3.00% -3.00% 14.440 14.629 14.629 14.440

136 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+712.00 14.468 -3.00% -3.00% 14.441 14.630 14.630 14.441


5+713.40 14.470 -3.00% -3.00% 14.443 14.632 14.632 14.443
5+714.80 14.471 -3.00% -3.00% 14.444 14.633 14.633 14.444
5+716.20 14.473 -3.00% -3.00% 14.446 14.635 14.635 14.446
5+717.60 14.474 -3.00% -3.00% 14.447 14.636 14.636 14.447
5+719.00 14.476 -3.00% -3.00% 14.449 14.638 14.638 14.449
5+720.40 14.478 -3.00% -3.00% 14.451 14.640 14.640 14.451
5+721.80 14.479 -3.00% -3.00% 14.452 14.641 14.641 14.452
5+723.20 14.481 -3.00% -3.00% 14.454 14.643 14.643 14.454
5+724.60 14.482 -3.00% -3.00% 14.455 14.644 14.644 14.455
5+726.00 14.484 -3.00% -3.00% 14.457 14.646 14.646 14.457
5+727.40 14.485 -3.00% -3.00% 14.458 14.647 14.647 14.458
5+728.80 14.487 -3.00% -3.00% 14.460 14.649 14.649 14.460
5+730.20 14.488 -3.00% -3.00% 14.461 14.650 14.650 14.461
5+731.60 14.490 -3.00% -3.00% 14.463 14.652 14.652 14.463
5+733.00 14.491 -3.00% -3.00% 14.464 14.653 14.653 14.464
5+734.40 14.493 -3.00% -3.00% 14.466 14.655 14.655 14.466
5+735.80 14.494 -3.00% -3.00% 14.467 14.656 14.656 14.467
5+737.20 14.496 -3.00% -3.00% 14.469 14.658 14.658 14.469
5+738.60 14.498 -3.00% -3.00% 14.471 14.660 14.660 14.471
5+740.00 14.499 -3.00% -3.00% 14.472 14.661 14.661 14.472
5+741.40 14.501 -3.00% -3.00% 14.474 14.663 14.663 14.474
5+742.80 14.502 -3.00% -3.00% 14.475 14.664 14.664 14.475
5+744.20 14.504 -3.00% -3.00% 14.477 14.666 14.666 14.477
5+745.60 14.505 -3.00% -3.00% 14.478 14.667 14.667 14.478
5+747.00 14.507 -3.00% -3.00% 14.480 14.669 14.669 14.480
5+748.40 14.508 -3.00% -3.00% 14.481 14.670 14.670 14.481
5+749.80 14.510 -3.00% -3.00% 14.483 14.672 14.672 14.483
5+751.20 14.511 -3.00% -3.00% 14.484 14.673 14.673 14.484
5+752.60 14.513 -3.00% -3.00% 14.486 14.675 14.675 14.486

137 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+754.00 14.514 -3.00% -3.00% 14.487 14.676 14.676 14.487


5+755.40 14.516 -3.00% -3.00% 14.489 14.678 14.678 14.489
5+756.80 14.517 -3.00% -3.00% 14.490 14.679 14.679 14.490
5+758.20 14.519 -3.00% -3.00% 14.492 14.681 14.681 14.492
5+759.60 14.521 -3.00% -3.00% 14.494 14.683 14.683 14.494
5+761.00 14.522 -3.00% -3.00% 14.495 14.684 14.684 14.495
5+762.40 14.524 -3.00% -3.00% 14.497 14.686 14.686 14.497
5+763.80 14.525 -3.00% -3.00% 14.498 14.687 14.687 14.498
5+765.20 14.527 -3.00% -3.00% 14.500 14.689 14.689 14.500
5+766.60 14.528 -3.00% -3.00% 14.501 14.690 14.690 14.501
5+768.00 14.530 -3.00% -3.00% 14.503 14.692 14.692 14.503
5+769.40 14.531 -3.00% -3.00% 14.504 14.693 14.693 14.504
5+770.80 14.533 -3.00% -3.00% 14.506 14.695 14.695 14.506
5+772.20 14.534 -3.00% -3.00% 14.507 14.696 14.696 14.507
5+773.60 14.536 -3.00% -3.00% 14.509 14.698 14.698 14.509
5+775.00 14.537 -3.00% -3.00% 14.510 14.699 14.699 14.510
5+776.40 14.539 -3.00% -3.00% 14.512 14.701 14.701 14.512
5+777.80 14.541 -3.00% -3.00% 14.514 14.703 14.703 14.514
5+779.20 14.542 -3.00% -3.00% 14.515 14.704 14.704 14.515
5+780.60 14.544 -3.00% -3.00% 14.517 14.706 14.706 14.517
5+782.00 14.545 -3.00% -3.00% 14.518 14.707 14.707 14.518
5+783.40 14.547 -3.00% -3.00% 14.520 14.709 14.709 14.520
5+784.80 14.548 -3.00% -3.00% 14.521 14.710 14.710 14.521
5+786.20 14.550 -3.00% -3.00% 14.523 14.712 14.712 14.523
5+787.60 14.551 -3.00% -3.00% 14.524 14.713 14.713 14.524
5+789.00 14.553 -3.00% -3.00% 14.526 14.715 14.715 14.526
5+790.40 14.554 -3.00% -3.00% 14.527 14.716 14.716 14.527
5+791.80 14.556 -3.00% -3.00% 14.529 14.718 14.718 14.529
5+793.20 14.557 -3.00% -3.00% 14.530 14.719 14.719 14.530
5+794.60 14.559 -3.00% -3.00% 14.532 14.721 14.721 14.532

138 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+796.00 14.561 -3.00% -3.00% 14.534 14.723 14.723 14.534


5+797.40 14.562 -3.00% -3.00% 14.535 14.724 14.724 14.535
5+798.80 14.564 -3.00% -3.00% 14.537 14.726 14.726 14.537
5+800.20 14.565 -3.00% -3.00% 14.538 14.727 14.727 14.538
5+801.60 14.567 -3.00% -3.00% 14.540 14.729 14.729 14.540
5+803.00 14.568 -3.00% -3.00% 14.541 14.730 14.730 14.541
5+804.40 14.570 -3.00% -3.00% 14.543 14.732 14.732 14.543
5+805.80 14.571 -3.00% -3.00% 14.544 14.733 14.733 14.544
5+807.20 14.573 -3.00% -3.00% 14.546 14.735 14.735 14.546
5+808.60 14.574 -3.00% -3.00% 14.547 14.736 14.736 14.547
5+810.00 14.576 -3.00% -3.00% 14.549 14.738 14.738 14.549
5+811.40 14.577 -3.00% -3.00% 14.550 14.739 14.739 14.550
5+812.80 14.579 -3.00% -3.00% 14.552 14.741 14.741 14.552
5+814.20 14.580 -3.00% -3.00% 14.553 14.742 14.742 14.553
5+815.60 14.582 -3.00% -3.00% 14.555 14.744 14.744 14.555
5+817.00 14.584 -3.00% -3.00% 14.557 14.746 14.746 14.557
5+818.40 14.585 -3.00% -3.00% 14.558 14.747 14.747 14.558
5+819.80 14.587 -3.00% -3.00% 14.560 14.749 14.749 14.560
5+821.20 14.588 -3.00% -3.00% 14.561 14.750 14.750 14.561
5+822.60 14.590 -3.00% -3.00% 14.563 14.752 14.752 14.563
5+824.00 14.591 -3.00% -3.00% 14.564 14.753 14.753 14.564
5+825.40 14.593 -3.00% -3.00% 14.566 14.755 14.755 14.566
5+826.80 14.594 -3.00% -3.00% 14.567 14.756 14.756 14.567
5+828.20 14.596 -3.00% -3.00% 14.569 14.758 14.758 14.569
5+829.60 14.597 -3.00% -3.00% 14.570 14.759 14.759 14.570
5+831.00 14.599 -3.00% -3.00% 14.572 14.761 14.761 14.572
5+832.40 14.600 -3.00% -3.00% 14.573 14.762 14.762 14.573
5+833.80 14.602 -3.00% -3.00% 14.575 14.764 14.764 14.575
5+835.20 14.604 -3.00% -3.00% 14.577 14.766 14.766 14.577
5+836.60 14.605 -3.00% -3.00% 14.578 14.767 14.767 14.578

139 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+838.00 14.607 -3.00% -3.00% 14.580 14.769 14.769 14.580


5+839.40 14.608 -3.00% -3.00% 14.581 14.770 14.770 14.581
5+840.80 14.610 -3.00% -3.00% 14.583 14.772 14.772 14.583
5+842.20 14.611 -3.00% -3.00% 14.584 14.773 14.773 14.584
5+843.60 14.613 -3.00% -3.00% 14.586 14.775 14.775 14.586
5+845.00 14.614 -3.00% -3.00% 14.587 14.776 14.776 14.587
5+846.40 14.616 -3.00% -3.00% 14.589 14.778 14.778 14.589
5+847.80 14.617 -3.00% -3.00% 14.590 14.779 14.779 14.590
5+849.20 14.619 -3.00% -3.00% 14.592 14.781 14.781 14.592
5+850.60 14.620 -3.00% -3.00% 14.593 14.782 14.782 14.593
5+852.00 14.622 -3.00% -3.00% 14.595 14.784 14.784 14.595
5+853.40 14.624 -3.00% -3.00% 14.597 14.786 14.786 14.597
5+854.80 14.625 -3.00% -3.00% 14.598 14.787 14.787 14.598
5+856.20 14.627 -3.00% -3.00% 14.600 14.789 14.789 14.600
5+857.60 14.628 -3.00% -3.00% 14.601 14.790 14.790 14.601
5+859.00 14.630 -3.00% -3.00% 14.603 14.792 14.792 14.603
5+860.40 14.631 -3.00% -3.00% 14.604 14.793 14.793 14.604
5+861.80 14.633 -3.00% -3.00% 14.606 14.795 14.795 14.606
5+863.20 14.634 -3.00% -3.00% 14.607 14.796 14.796 14.607
5+864.60 14.636 -3.00% -3.00% 14.609 14.798 14.798 14.609
5+866.00 14.637 -3.00% -3.00% 14.610 14.799 14.799 14.610
5+867.40 14.639 -3.00% -3.00% 14.612 14.801 14.801 14.612
5+868.80 14.640 -3.00% -3.00% 14.613 14.802 14.802 14.613
5+870.20 14.642 -3.00% -3.00% 14.615 14.804 14.804 14.615
5+871.60 14.643 -3.00% -3.00% 14.616 14.805 14.805 14.616
5+873.00 14.645 -3.00% -3.00% 14.618 14.807 14.807 14.618
5+874.40 14.647 -3.00% -3.00% 14.620 14.809 14.809 14.620
5+875.80 14.648 -3.00% -3.00% 14.621 14.810 14.810 14.621
5+877.20 14.650 -3.00% -3.00% 14.623 14.812 14.812 14.623
5+878.60 14.651 -3.00% -3.00% 14.624 14.813 14.813 14.624

140 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+880.00 14.653 -3.00% -3.00% 14.626 14.815 14.815 14.626


5+881.40 14.654 -3.00% -3.00% 14.627 14.816 14.816 14.627
5+882.80 14.656 -3.00% -3.00% 14.629 14.818 14.818 14.629
5+884.20 14.657 -3.00% -3.00% 14.630 14.819 14.819 14.630
5+885.60 14.659 -3.00% -3.00% 14.632 14.821 14.821 14.632
5+887.00 14.660 -3.00% -3.00% 14.633 14.822 14.822 14.633
5+888.40 14.662 -3.00% -3.00% 14.635 14.824 14.824 14.635
5+889.80 14.663 -3.00% -3.00% 14.636 14.825 14.825 14.636
5+891.20 14.665 -3.00% -3.00% 14.638 14.827 14.827 14.638
5+892.60 14.667 -3.00% -3.00% 14.640 14.829 14.829 14.640
5+894.00 14.668 -3.00% -3.00% 14.641 14.830 14.830 14.641
5+895.40 14.670 -3.00% -3.00% 14.643 14.832 14.832 14.643
5+896.80 14.671 -3.00% -3.00% 14.644 14.833 14.833 14.644
5+898.20 14.673 -3.00% -3.00% 14.646 14.835 14.835 14.646
5+899.60 14.674 -3.00% -3.00% 14.647 14.836 14.836 14.647
5+901.00 14.676 -3.00% -3.00% 14.649 14.838 14.838 14.649
5+902.40 14.677 -3.00% -3.00% 14.650 14.839 14.839 14.650
5+903.80 14.679 -3.00% -3.00% 14.652 14.841 14.841 14.652
5+905.20 14.680 -3.00% -3.00% 14.653 14.842 14.842 14.653
5+906.60 14.682 -3.00% -3.00% 14.655 14.844 14.844 14.655
5+908.00 14.683 -3.00% -3.00% 14.656 14.845 14.845 14.656
5+909.40 14.685 -3.00% -3.00% 14.658 14.847 14.847 14.658
5+910.80 14.686 -3.00% -3.00% 14.659 14.848 14.848 14.659
5+912.20 14.688 -3.00% -3.00% 14.661 14.850 14.850 14.661
5+913.60 14.690 -3.00% -3.00% 14.663 14.852 14.852 14.663
5+915.00 14.691 -3.00% -3.00% 14.664 14.853 14.853 14.664
5+916.40 14.693 -3.00% -3.00% 14.666 14.855 14.855 14.666
5+917.80 14.694 -3.00% -3.00% 14.667 14.856 14.856 14.667
5+919.20 14.696 -3.00% -3.00% 14.669 14.858 14.858 14.669
5+920.60 14.697 -3.00% -3.00% 14.670 14.859 14.859 14.670

141 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+922.00 14.699 -3.00% -3.00% 14.672 14.861 14.861 14.672


5+923.40 14.700 -3.00% -3.00% 14.673 14.862 14.862 14.673
5+924.80 14.702 -3.00% -3.00% 14.675 14.864 14.864 14.675
5+926.20 14.703 -3.00% -3.00% 14.676 14.865 14.865 14.676
5+927.60 14.705 -3.00% -3.00% 14.678 14.867 14.867 14.678
5+929.00 14.706 -3.00% -3.00% 14.679 14.868 14.868 14.679
5+930.40 14.708 -3.00% -3.00% 14.681 14.870 14.870 14.681
5+931.80 14.710 -3.00% -3.00% 14.683 14.872 14.872 14.683
5+933.20 14.711 -3.00% -3.00% 14.684 14.873 14.873 14.684
5+934.60 14.713 -3.00% -3.00% 14.686 14.875 14.875 14.686
5+936.00 14.714 -3.00% -3.00% 14.687 14.876 14.876 14.687
5+937.40 14.716 -3.00% -3.00% 14.689 14.878 14.878 14.689
5+938.80 14.717 -3.00% -3.00% 14.690 14.879 14.879 14.690
5+940.20 14.719 -3.00% -3.00% 14.692 14.881 14.881 14.692
5+941.60 14.720 -3.00% -3.00% 14.693 14.882 14.882 14.693
5+943.00 14.722 -3.00% -3.00% 14.695 14.884 14.884 14.695
5+944.40 14.723 -3.00% -3.00% 14.696 14.885 14.885 14.696
5+945.80 14.725 -3.00% -3.00% 14.698 14.887 14.887 14.698
5+947.20 14.726 -3.00% -3.00% 14.699 14.888 14.888 14.699
5+948.60 14.728 -3.00% -3.00% 14.701 14.890 14.890 14.701
5+950.00 14.730 -3.00% -3.00% 14.703 14.892 14.892 14.703
5+951.40 14.731 -3.00% -3.00% 14.704 14.893 14.893 14.704
5+952.80 14.733 -3.00% -3.00% 14.706 14.895 14.895 14.706
5+954.20 14.734 -3.00% -3.00% 14.707 14.896 14.896 14.707
5+955.60 14.736 -3.00% -3.00% 14.709 14.898 14.898 14.709
5+957.00 14.737 -3.00% -3.00% 14.710 14.899 14.899 14.710
5+958.40 14.739 -3.00% -3.00% 14.712 14.901 14.901 14.712
5+959.80 14.740 -3.00% -3.00% 14.713 14.902 14.902 14.713
5+961.20 14.742 -3.00% -3.00% 14.715 14.904 14.904 14.715
5+962.60 14.743 -3.00% -3.00% 14.716 14.905 14.905 14.716

142 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

5+964.00 14.745 -3.00% -3.00% 14.718 14.907 14.907 14.718


5+965.40 14.746 -3.00% -3.00% 14.719 14.908 14.908 14.719
5+966.80 14.748 -3.00% -3.00% 14.721 14.910 14.910 14.721
5+968.20 14.749 -3.00% -3.00% 14.722 14.911 14.911 14.722
5+969.60 14.751 -3.00% -3.00% 14.724 14.913 14.913 14.724
5+971.00 14.753 -3.00% -3.00% 14.726 14.915 14.915 14.726
5+972.40 14.754 -3.00% -3.00% 14.727 14.916 14.916 14.727
5+973.80 14.756 -3.00% -3.00% 14.729 14.918 14.918 14.729
5+975.20 14.757 -3.00% -3.00% 14.730 14.919 14.919 14.730
5+976.60 14.759 -3.00% -3.00% 14.732 14.921 14.921 14.732
5+978.00 14.760 -3.00% -3.00% 14.733 14.922 14.922 14.733
5+979.40 14.762 -3.00% -3.00% 14.735 14.924 14.924 14.735
5+980.80 14.763 -3.00% -3.00% 14.736 14.925 14.925 14.736
5+982.20 14.765 -3.00% -3.00% 14.738 14.927 14.927 14.738
5+983.60 14.766 -3.00% -3.00% 14.739 14.928 14.928 14.739
5+985.00 14.768 -3.00% -3.00% 14.741 14.930 14.930 14.741
5+986.40 14.769 -3.00% -3.00% 14.742 14.931 14.931 14.742
5+987.80 14.771 -3.00% -3.00% 14.744 14.933 14.933 14.744
5+989.20 14.773 -3.00% -3.00% 14.746 14.935 14.935 14.746
5+990.60 14.774 -3.00% -3.00% 14.747 14.936 14.936 14.747
5+992.00 14.776 -3.00% -3.00% 14.749 14.938 14.938 14.749
5+993.40 14.777 -3.00% -3.00% 14.750 14.939 14.939 14.750
5+994.80 14.779 -3.00% -3.00% 14.752 14.941 14.941 14.752
5+996.20 14.780 -3.00% -3.00% 14.753 14.942 14.942 14.753
5+997.60 14.782 -3.00% -3.00% 14.755 14.944 14.944 14.755
5+999.00 14.783 -3.00% -3.00% 14.756 14.945 14.945 14.756
6+000.40 14.785 -3.00% -3.00% 14.758 14.947 14.947 14.758
6+001.80 14.786 -3.00% -3.00% 14.759 14.948 14.948 14.759
6+003.20 14.788 -3.00% -3.00% 14.761 14.950 14.950 14.761
6+004.60 14.789 -3.00% -3.00% 14.762 14.951 14.951 14.762

143 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+006.00 14.791 -3.00% -3.00% 14.764 14.953 14.953 14.764


6+007.40 14.793 -3.00% -3.00% 14.766 14.955 14.955 14.766
6+008.80 14.794 -3.00% -3.00% 14.767 14.956 14.956 14.767
6+010.20 14.796 -3.00% -3.00% 14.769 14.958 14.958 14.769
6+011.60 14.797 -3.00% -3.00% 14.770 14.959 14.959 14.770
6+013.00 14.799 -3.00% -3.00% 14.772 14.961 14.961 14.772
6+014.40 14.800 -3.00% -3.00% 14.773 14.962 14.962 14.773
6+015.80 14.802 -3.00% -3.00% 14.775 14.964 14.964 14.775
6+017.20 14.803 -3.00% -3.00% 14.776 14.965 14.965 14.776
6+018.60 14.805 -3.00% -3.00% 14.778 14.967 14.967 14.778
6+020.00 14.806 -3.00% -3.00% 14.779 14.968 14.968 14.779
6+021.40 14.808 -3.00% -3.00% 14.781 14.970 14.970 14.781
6+022.80 14.809 -3.00% -3.00% 14.782 14.971 14.971 14.782
6+024.20 14.811 -3.00% -3.00% 14.784 14.973 14.973 14.784
6+025.60 14.812 -3.00% -3.00% 14.785 14.974 14.974 14.785
6+027.00 14.814 -3.00% -3.00% 14.787 14.976 14.976 14.787
6+028.40 14.816 -3.00% -3.00% 14.789 14.978 14.978 14.789
6+029.80 14.817 -3.00% -3.00% 14.790 14.979 14.979 14.790
6+031.20 14.819 -3.00% -3.00% 14.792 14.981 14.981 14.792
6+032.60 14.820 -3.00% -3.00% 14.793 14.982 14.982 14.793
6+034.00 14.822 -3.00% -3.00% 14.795 14.984 14.984 14.795
6+035.40 14.823 -3.00% -3.00% 14.796 14.985 14.985 14.796
6+036.80 14.825 -3.00% -3.00% 14.798 14.987 14.987 14.798
6+038.20 14.826 -3.00% -3.00% 14.799 14.988 14.988 14.799
6+039.60 14.828 -3.00% -3.00% 14.801 14.990 14.990 14.801
6+041.00 14.829 -3.00% -3.00% 14.802 14.991 14.991 14.802
6+042.40 14.831 -3.00% -3.00% 14.804 14.993 14.993 14.804
6+043.80 14.832 -3.00% -3.00% 14.805 14.994 14.994 14.805
6+045.20 14.834 -3.00% -3.00% 14.807 14.996 14.996 14.807
6+046.60 14.836 -3.00% -3.00% 14.809 14.998 14.998 14.809

144 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+048.00 14.837 -3.00% -3.00% 14.810 14.999 14.999 14.810


6+049.40 14.839 -3.00% -3.00% 14.812 15.001 15.001 14.812
6+050.80 14.840 -3.00% -3.00% 14.813 15.002 15.002 14.813
6+052.20 14.842 -3.00% -3.00% 14.815 15.004 15.004 14.815
6+053.60 14.843 -3.00% -3.00% 14.816 15.005 15.005 14.816
6+055.00 14.845 -3.00% -3.00% 14.818 15.007 15.007 14.818
6+056.40 14.846 -3.00% -3.00% 14.819 15.008 15.008 14.819
6+057.80 14.848 -3.00% -3.00% 14.821 15.010 15.010 14.821
6+059.20 14.849 -3.00% -3.00% 14.822 15.011 15.011 14.822
6+060.60 14.851 -3.00% -3.00% 14.824 15.013 15.013 14.824
6+062.00 14.852 -3.00% -3.00% 14.825 15.014 15.014 14.825
6+063.40 14.854 -3.00% -3.00% 14.827 15.016 15.016 14.827
6+064.80 14.855 -3.00% -3.00% 14.828 15.017 15.017 14.828
6+066.20 14.857 -3.00% -3.00% 14.830 15.019 15.019 14.830
6+067.60 14.859 -3.00% -3.00% 14.832 15.021 15.021 14.832
6+069.00 14.860 -3.00% -3.00% 14.833 15.022 15.022 14.833
6+070.40 14.862 -3.00% -3.00% 14.835 15.024 15.024 14.835
6+071.80 14.863 -3.00% -3.00% 14.836 15.025 15.025 14.836
6+073.20 14.865 -3.00% -3.00% 14.838 15.027 15.027 14.838
6+074.60 14.866 -3.00% -3.00% 14.839 15.028 15.028 14.839
6+076.00 14.868 -3.00% -3.00% 14.841 15.030 15.030 14.841
6+077.40 14.869 -3.00% -3.00% 14.842 15.031 15.031 14.842
6+078.80 14.871 -3.00% -3.00% 14.844 15.033 15.033 14.844
6+080.20 14.872 -3.00% -3.00% 14.845 15.034 15.034 14.845
6+081.60 14.874 -3.00% -3.00% 14.847 15.036 15.036 14.847
6+083.00 14.875 -3.00% -3.00% 14.848 15.037 15.037 14.848
6+084.40 14.877 -3.00% -3.00% 14.850 15.039 15.039 14.850
6+085.80 14.879 -3.00% -3.00% 14.852 15.041 15.041 14.852
6+087.20 14.880 -3.00% -3.00% 14.853 15.042 15.042 14.853
6+088.60 14.882 -3.00% -3.00% 14.855 15.044 15.044 14.855

145 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+090.00 14.883 -3.00% -3.00% 14.856 15.045 15.045 14.856


6+091.40 14.885 -3.00% -3.00% 14.858 15.047 15.047 14.858
6+092.80 14.886 -3.00% -3.00% 14.859 15.048 15.048 14.859
6+094.20 14.888 -3.00% -3.00% 14.861 15.050 15.050 14.861
6+095.60 14.889 -3.00% -3.00% 14.862 15.051 15.051 14.862
6+097.00 14.891 -3.00% -3.00% 14.864 15.053 15.053 14.864
6+098.40 14.892 -3.00% -3.00% 14.865 15.054 15.054 14.865
6+099.80 14.894 -3.00% -3.00% 14.867 15.056 15.056 14.867
6+101.20 14.895 -3.00% -3.00% 14.868 15.057 15.057 14.868
6+102.60 14.897 -3.00% -3.00% 14.870 15.059 15.059 14.870
6+104.00 14.899 -3.00% -3.00% 14.872 15.061 15.061 14.872
6+105.40 14.900 -3.00% -3.00% 14.873 15.062 15.062 14.873
6+106.80 14.902 -3.00% -3.00% 14.875 15.064 15.064 14.875
6+108.20 14.903 -3.00% -3.00% 14.876 15.065 15.065 14.876
6+109.60 14.905 -3.00% -3.00% 14.878 15.067 15.067 14.878
6+111.00 14.906 -3.00% -3.00% 14.879 15.068 15.068 14.879
6+112.40 14.908 -3.00% -3.00% 14.881 15.070 15.070 14.881
6+113.80 14.909 -3.00% -3.00% 14.882 15.071 15.071 14.882
6+115.20 14.911 -3.00% -3.00% 14.884 15.073 15.073 14.884
6+116.60 14.912 -3.00% -3.00% 14.885 15.074 15.074 14.885
6+118.00 14.914 -3.00% -3.00% 14.887 15.076 15.076 14.887
6+119.40 14.915 -3.00% -3.00% 14.888 15.077 15.077 14.888
6+120.80 14.917 -3.00% -3.00% 14.890 15.079 15.079 14.890
6+122.20 14.918 -3.00% -3.00% 14.891 15.080 15.080 14.891
6+123.60 14.920 -3.00% -3.00% 14.893 15.082 15.082 14.893
6+125.00 14.922 -3.00% -3.00% 14.895 15.084 15.084 14.895
6+126.40 14.923 -3.00% -3.00% 14.896 15.085 15.085 14.896
6+127.80 14.925 -3.00% -3.00% 14.898 15.087 15.087 14.898
6+129.20 14.926 -3.00% -3.00% 14.899 15.088 15.088 14.899
6+130.60 14.928 -3.00% -3.00% 14.901 15.090 15.090 14.901

146 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+132.00 14.929 -3.00% -3.00% 14.902 15.091 15.091 14.902


6+133.40 14.931 -3.00% -3.00% 14.904 15.093 15.093 14.904
6+134.80 14.932 -3.00% -3.00% 14.905 15.094 15.094 14.905
6+136.20 14.934 -3.00% -3.00% 14.907 15.096 15.096 14.907
6+137.60 14.935 -3.00% -3.00% 14.908 15.097 15.097 14.908
6+139.00 14.937 -3.00% -3.00% 14.910 15.099 15.099 14.910
6+140.40 14.938 -3.00% -3.00% 14.911 15.100 15.100 14.911
6+141.80 14.940 -3.00% -3.00% 14.913 15.102 15.102 14.913
6+143.20 14.942 -3.00% -3.00% 14.915 15.104 15.104 14.915
6+144.60 14.943 -3.00% -3.00% 14.916 15.105 15.105 14.916
6+146.00 14.945 -3.00% -3.00% 14.918 15.107 15.107 14.918
6+147.40 14.946 -3.00% -3.00% 14.919 15.108 15.108 14.919
6+148.80 14.948 -3.00% -3.00% 14.921 15.110 15.110 14.921
6+150.20 14.949 -3.00% -3.00% 14.922 15.111 15.111 14.922
6+151.60 14.951 -3.00% -3.00% 14.924 15.113 15.113 14.924
6+153.00 14.952 -3.00% -3.00% 14.925 15.114 15.114 14.925
6+154.40 14.954 -3.00% -3.00% 14.927 15.116 15.116 14.927
6+155.80 14.955 -3.00% -3.00% 14.928 15.117 15.117 14.928
6+157.20 14.957 -3.00% -3.00% 14.930 15.119 15.119 14.930
6+158.60 14.958 -3.00% -3.00% 14.931 15.120 15.120 14.931
6+160.00 14.960 -3.00% -3.00% 14.933 15.122 15.122 14.933
6+161.40 14.962 -3.00% -3.00% 14.935 15.124 15.124 14.935
6+162.80 14.963 -3.00% -3.00% 14.936 15.125 15.125 14.936
6+164.20 14.965 -3.00% -3.00% 14.938 15.127 15.127 14.938
6+165.60 14.966 -3.00% -3.00% 14.939 15.128 15.128 14.939
6+167.00 14.968 -3.00% -3.00% 14.941 15.130 15.130 14.941
6+168.40 14.969 -3.00% -3.00% 14.942 15.131 15.131 14.942
6+169.80 14.971 -3.00% -3.00% 14.944 15.133 15.133 14.944
6+171.20 14.972 -3.00% -3.00% 14.945 15.134 15.134 14.945
6+172.60 14.974 -3.00% -3.00% 14.947 15.136 15.136 14.947

147 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+174.00 14.975 -3.00% -3.00% 14.948 15.137 15.137 14.948


6+175.40 14.977 -3.00% -3.00% 14.950 15.139 15.139 14.950
6+176.80 14.978 -3.00% -3.00% 14.951 15.140 15.140 14.951
6+178.20 14.980 -3.00% -3.00% 14.953 15.142 15.142 14.953
6+179.60 14.981 -3.00% -3.00% 14.954 15.143 15.143 14.954
6+181.00 14.983 -3.00% -3.00% 14.956 15.145 15.145 14.956
6+182.40 14.985 -3.00% -3.00% 14.958 15.147 15.147 14.958
6+183.80 14.986 -3.00% -3.00% 14.959 15.148 15.148 14.959
6+185.20 14.988 -3.00% -3.00% 14.961 15.150 15.150 14.961
6+186.60 14.989 -3.00% -3.00% 14.962 15.151 15.151 14.962
6+188.00 14.991 -3.00% -3.00% 14.964 15.153 15.153 14.964
6+189.40 14.992 -3.00% -3.00% 14.965 15.154 15.154 14.965
6+190.80 14.994 -3.00% -3.00% 14.967 15.156 15.156 14.967
6+192.20 14.995 -3.00% -3.00% 14.968 15.157 15.157 14.968
6+193.60 14.997 -3.00% -3.00% 14.970 15.159 15.159 14.970
6+195.00 14.998 -3.00% -3.00% 14.971 15.160 15.160 14.971
6+196.40 15.000 -3.00% -3.00% 14.973 15.162 15.162 14.973
6+197.80 15.001 -3.00% -3.00% 14.974 15.163 15.163 14.974
6+199.20 15.003 -3.00% -3.00% 14.976 15.165 15.165 14.976
6+200.60 15.005 -3.00% -3.00% 14.978 15.167 15.167 14.978
6+202.00 15.006 -3.00% -3.00% 14.979 15.168 15.168 14.979
6+203.40 15.008 -3.00% -3.00% 14.981 15.170 15.170 14.981
6+204.80 15.009 -3.00% -3.00% 14.982 15.171 15.171 14.982
6+206.20 15.011 -3.00% -3.00% 14.984 15.173 15.173 14.984
6+207.60 15.012 -3.00% -3.00% 14.985 15.174 15.174 14.985
6+209.00 15.014 -3.00% -3.00% 14.987 15.176 15.176 14.987
6+210.40 15.015 -3.00% -3.00% 14.988 15.177 15.177 14.988
6+211.80 15.017 -3.00% -3.00% 14.990 15.179 15.179 14.990
6+213.20 15.018 -3.00% -3.00% 14.991 15.180 15.180 14.991
6+214.60 15.020 -3.00% -3.00% 14.993 15.182 15.182 14.993

148 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+216.00 15.021 -3.00% -3.00% 14.994 15.183 15.183 14.994


6+217.40 15.023 -3.00% -3.00% 14.996 15.185 15.185 14.996
6+218.80 15.025 -3.00% -3.00% 14.998 15.187 15.187 14.998
6+220.20 15.026 -3.00% -3.00% 14.999 15.188 15.188 14.999
6+221.60 15.028 -3.00% -3.00% 15.001 15.190 15.190 15.001
6+223.00 15.029 -3.00% -3.00% 15.002 15.191 15.191 15.002
6+224.40 15.031 -3.00% -3.00% 15.004 15.193 15.193 15.004
6+225.80 15.032 -3.00% -3.00% 15.005 15.194 15.194 15.005
6+227.20 15.034 -3.00% -3.00% 15.007 15.196 15.196 15.007
6+228.60 15.035 -3.00% -3.00% 15.008 15.197 15.197 15.008
6+230.00 15.037 -3.00% -3.00% 15.010 15.199 15.199 15.010
6+231.40 15.038 -3.00% -3.00% 15.011 15.200 15.200 15.011
6+232.80 15.040 -3.00% -3.00% 15.013 15.202 15.202 15.013
6+234.20 15.041 -3.00% -3.00% 15.014 15.203 15.203 15.014
6+235.60 15.043 -3.00% -3.00% 15.016 15.205 15.205 15.016
6+237.00 15.044 -3.00% -3.00% 15.017 15.206 15.206 15.017
6+238.40 15.046 -3.00% -3.00% 15.019 15.208 15.208 15.019
6+239.80 15.048 -3.00% -3.00% 15.021 15.210 15.210 15.021
6+241.20 15.049 -3.00% -3.00% 15.022 15.211 15.211 15.022
6+242.60 15.051 -3.00% -3.00% 15.024 15.213 15.213 15.024
6+244.00 15.052 -3.00% -3.00% 15.025 15.214 15.214 15.025
6+245.40 15.054 -3.00% -3.00% 15.027 15.216 15.216 15.027
6+246.80 15.055 -3.00% -3.00% 15.028 15.217 15.217 15.028
6+248.20 15.057 -3.00% -3.00% 15.030 15.219 15.219 15.030
6+249.60 15.058 -3.00% -3.00% 15.031 15.220 15.220 15.031
6+251.00 15.060 -3.00% -3.00% 15.033 15.222 15.222 15.033
6+252.40 15.061 -3.00% -3.00% 15.034 15.223 15.223 15.034
6+253.80 15.063 -3.00% -3.00% 15.036 15.225 15.225 15.036
6+255.20 15.064 -3.00% -3.00% 15.037 15.226 15.226 15.037
6+256.60 15.066 -3.00% -3.00% 15.039 15.228 15.228 15.039

149 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+258.00 15.068 -3.00% -3.00% 15.041 15.230 15.230 15.041


6+259.40 15.069 -3.00% -3.00% 15.042 15.231 15.231 15.042
6+260.80 15.071 -3.00% -3.00% 15.044 15.233 15.233 15.044
6+262.20 15.072 -3.00% -3.00% 15.045 15.234 15.234 15.045
6+263.60 15.074 -3.00% -3.00% 15.047 15.236 15.236 15.047
6+265.00 15.075 -3.00% -3.00% 15.048 15.237 15.237 15.048
6+266.40 15.077 -3.00% -3.00% 15.050 15.239 15.239 15.050
6+267.80 15.078 -3.00% -3.00% 15.051 15.240 15.240 15.051
6+269.20 15.080 -3.00% -3.00% 15.053 15.242 15.242 15.053
6+270.60 15.081 -3.00% -3.00% 15.054 15.243 15.243 15.054
6+272.00 15.083 -3.00% -3.00% 15.056 15.245 15.245 15.056
6+273.40 15.084 -3.00% -3.00% 15.057 15.246 15.246 15.057
6+274.80 15.086 -3.00% -3.00% 15.059 15.248 15.248 15.059
6+276.20 15.087 -3.00% -3.00% 15.060 15.249 15.249 15.060
6+277.60 15.089 -3.00% -3.00% 15.062 15.251 15.251 15.062
6+279.00 15.091 -3.00% -3.00% 15.064 15.253 15.253 15.064
6+280.40 15.092 -3.00% -3.00% 15.065 15.254 15.254 15.065
6+281.80 15.094 -3.00% -3.00% 15.067 15.256 15.256 15.067
6+283.20 15.095 -3.00% -3.00% 15.068 15.257 15.257 15.068
6+284.60 15.097 -3.00% -3.00% 15.070 15.259 15.259 15.070
6+286.00 15.098 -3.00% -3.00% 15.071 15.260 15.260 15.071
6+287.40 15.100 -3.00% -3.00% 15.073 15.262 15.262 15.073
6+288.80 15.101 -3.00% -3.00% 15.074 15.263 15.263 15.074
6+290.20 15.103 -3.00% -3.00% 15.076 15.265 15.265 15.076
6+291.60 15.104 -3.00% -3.00% 15.077 15.266 15.266 15.077
6+293.00 15.106 -3.00% -3.00% 15.079 15.268 15.268 15.079
6+294.40 15.107 -3.00% -3.00% 15.080 15.269 15.269 15.080
6+295.80 15.109 -3.00% -3.00% 15.082 15.271 15.271 15.082
6+297.20 15.111 -3.00% -3.00% 15.084 15.273 15.273 15.084
6+298.60 15.112 -3.00% -3.00% 15.085 15.274 15.274 15.085

150 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+300.00 15.114 -3.00% -3.00% 15.087 15.276 15.276 15.087


6+301.40 15.115 -3.00% -3.00% 15.088 15.277 15.277 15.088
6+302.80 15.117 -3.00% -3.00% 15.090 15.279 15.279 15.090
6+304.20 15.118 -3.00% -3.00% 15.091 15.280 15.280 15.091
6+305.60 15.120 -3.00% -3.00% 15.093 15.282 15.282 15.093
6+307.00 15.121 -3.00% -3.00% 15.094 15.283 15.283 15.094
6+308.40 15.123 -3.00% -3.00% 15.096 15.285 15.285 15.096
6+309.80 15.124 -3.00% -3.00% 15.097 15.286 15.286 15.097
6+311.20 15.126 -3.00% -3.00% 15.099 15.288 15.288 15.099
6+312.60 15.127 -3.00% -3.00% 15.100 15.289 15.289 15.100
6+314.00 15.129 -3.00% -3.00% 15.102 15.291 15.291 15.102
6+315.40 15.131 -3.00% -3.00% 15.104 15.293 15.293 15.104
6+316.80 15.132 -3.00% -3.00% 15.105 15.294 15.294 15.105
6+318.20 15.134 -3.00% -3.00% 15.107 15.296 15.296 15.107
6+319.60 15.135 -3.00% -3.00% 15.108 15.297 15.297 15.108
6+321.00 15.137 -3.00% -3.00% 15.110 15.299 15.299 15.110
6+322.40 15.138 -3.00% -3.00% 15.111 15.300 15.300 15.111
6+323.80 15.140 -3.00% -3.00% 15.113 15.302 15.302 15.113
6+325.20 15.141 -3.00% -3.00% 15.114 15.303 15.303 15.114
6+326.60 15.143 -3.00% -3.00% 15.116 15.305 15.305 15.116
6+328.00 15.144 -3.00% -3.00% 15.117 15.306 15.306 15.117
6+329.40 15.146 -3.00% -3.00% 15.119 15.308 15.308 15.119
6+330.80 15.147 -3.00% -3.00% 15.120 15.309 15.309 15.120
6+332.20 15.149 -3.00% -3.00% 15.122 15.311 15.311 15.122
6+333.60 15.150 -3.00% -3.00% 15.123 15.312 15.312 15.123
6+335.00 15.152 -3.00% -3.00% 15.125 15.314 15.314 15.125
6+336.40 15.154 -3.00% -3.00% 15.127 15.316 15.316 15.127
6+337.80 15.155 -3.00% -3.00% 15.128 15.317 15.317 15.128
6+339.20 15.157 -3.00% -3.00% 15.130 15.319 15.319 15.130
6+340.60 15.158 -3.00% -3.00% 15.131 15.320 15.320 15.131

151 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+342.00 15.160 -3.00% -3.00% 15.133 15.322 15.322 15.133


6+343.40 15.161 -3.00% -3.00% 15.134 15.323 15.323 15.134
6+344.80 15.163 -3.00% -3.00% 15.136 15.325 15.325 15.136
6+346.20 15.164 -3.00% -3.00% 15.137 15.326 15.326 15.137
6+347.60 15.166 -3.00% -3.00% 15.139 15.328 15.328 15.139
6+349.00 15.167 -3.00% -3.00% 15.140 15.329 15.329 15.140
6+350.40 15.169 -3.00% -3.00% 15.142 15.331 15.331 15.142
6+351.80 15.170 -3.00% -3.00% 15.143 15.332 15.332 15.143
6+353.20 15.172 -3.00% -3.00% 15.145 15.334 15.334 15.145
6+354.60 15.174 -3.00% -3.00% 15.147 15.336 15.336 15.147
6+356.00 15.175 -3.00% -3.00% 15.148 15.337 15.337 15.148
6+357.40 15.177 -3.00% -3.00% 15.150 15.339 15.339 15.150
6+358.80 15.178 -3.00% -3.00% 15.151 15.340 15.340 15.151
6+360.20 15.180 -3.00% -3.00% 15.153 15.342 15.342 15.153
6+361.60 15.181 -3.00% -3.00% 15.154 15.343 15.343 15.154
6+363.00 15.183 -3.00% -3.00% 15.156 15.345 15.345 15.156
6+364.40 15.184 -3.00% -3.00% 15.157 15.346 15.346 15.157
6+365.80 15.186 -3.00% -3.00% 15.159 15.348 15.348 15.159
6+367.20 15.187 -3.00% -3.00% 15.160 15.349 15.349 15.160
6+368.60 15.189 -3.00% -3.00% 15.162 15.351 15.351 15.162
6+370.00 15.190 -3.00% -3.00% 15.163 15.352 15.352 15.163
6+371.40 15.192 -3.00% -3.00% 15.165 15.354 15.354 15.165
6+372.80 15.194 -3.00% -3.00% 15.167 15.356 15.356 15.167
6+374.20 15.195 -3.00% -3.00% 15.168 15.357 15.357 15.168
6+375.60 15.197 -3.00% -3.00% 15.170 15.359 15.359 15.170
6+377.00 15.198 -3.00% -3.00% 15.171 15.360 15.360 15.171
6+378.40 15.200 -3.00% -3.00% 15.173 15.362 15.362 15.173
6+379.80 15.201 -3.00% -3.00% 15.174 15.363 15.363 15.174
6+381.20 15.203 -3.00% -3.00% 15.176 15.365 15.365 15.176
6+382.60 15.204 -3.00% -3.00% 15.177 15.366 15.366 15.177

152 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+384.00 15.206 -3.00% -3.00% 15.179 15.368 15.368 15.179


6+385.40 15.207 -3.00% -3.00% 15.180 15.369 15.369 15.180
6+386.80 15.209 -3.00% -3.00% 15.182 15.371 15.371 15.182
6+388.20 15.210 -3.00% -3.00% 15.183 15.372 15.372 15.183
6+389.60 15.212 -3.00% -3.00% 15.185 15.374 15.374 15.185
6+391.00 15.213 -3.00% -3.00% 15.186 15.375 15.375 15.186
6+392.40 15.215 -3.00% -3.00% 15.188 15.377 15.377 15.188
6+393.80 15.217 -3.00% -3.00% 15.190 15.379 15.379 15.190
6+395.20 15.218 -3.00% -3.00% 15.191 15.380 15.380 15.191
6+396.60 15.220 -3.00% -3.00% 15.193 15.382 15.382 15.193
6+398.00 15.221 -3.00% -3.00% 15.194 15.383 15.383 15.194
6+399.40 15.223 -3.00% -3.00% 15.196 15.385 15.385 15.196
6+400.80 15.224 -3.00% -3.00% 15.197 15.386 15.386 15.197
6+402.20 15.226 -3.00% -3.00% 15.199 15.388 15.388 15.199
6+403.60 15.227 -3.00% -3.00% 15.200 15.389 15.389 15.200
6+405.00 15.229 -3.00% -3.00% 15.202 15.391 15.391 15.202
6+406.40 15.230 -3.00% -3.00% 15.203 15.392 15.392 15.203
6+407.80 15.232 -3.00% -3.00% 15.205 15.394 15.394 15.205
6+409.20 15.233 -3.00% -3.00% 15.206 15.395 15.395 15.206
6+410.60 15.235 -3.00% -3.00% 15.208 15.397 15.397 15.208
6+412.00 15.237 -3.00% -3.00% 15.210 15.399 15.399 15.210
6+413.40 15.238 -3.00% -3.00% 15.211 15.400 15.400 15.211
6+414.80 15.240 -3.00% -3.00% 15.213 15.402 15.402 15.213
6+416.20 15.241 -3.00% -3.00% 15.214 15.403 15.403 15.214
6+417.60 15.243 -3.00% -3.00% 15.216 15.405 15.405 15.216
6+419.00 15.244 -3.00% -3.00% 15.217 15.406 15.406 15.217
6+420.40 15.246 -3.00% -3.00% 15.219 15.408 15.408 15.219
6+421.80 15.247 -3.00% -3.00% 15.220 15.409 15.409 15.220
6+423.20 15.249 -3.00% -3.00% 15.222 15.411 15.411 15.222
6+424.60 15.250 -3.00% -3.00% 15.223 15.412 15.412 15.223

153 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+426.00 15.252 -3.00% -3.00% 15.225 15.414 15.414 15.225


6+427.40 15.253 -3.00% -3.00% 15.226 15.415 15.415 15.226
6+428.80 15.255 -3.00% -3.00% 15.228 15.417 15.417 15.228
6+430.20 15.257 -3.00% -3.00% 15.230 15.419 15.419 15.230
6+431.60 15.258 -3.00% -3.00% 15.231 15.420 15.420 15.231
6+433.00 15.260 -3.00% -3.00% 15.233 15.422 15.422 15.233
6+434.40 15.261 -3.00% -3.00% 15.234 15.423 15.423 15.234
6+435.80 15.263 -3.00% -3.00% 15.236 15.425 15.425 15.236
6+437.20 15.264 -3.00% -3.00% 15.237 15.426 15.426 15.237
6+438.60 15.266 -3.00% -3.00% 15.239 15.428 15.428 15.239
6+440.00 15.267 -3.00% -3.00% 15.240 15.429 15.429 15.240
6+441.40 15.269 -3.00% -3.00% 15.242 15.431 15.431 15.242
6+442.80 15.270 -3.00% -3.00% 15.243 15.432 15.432 15.243
6+444.20 15.272 -3.00% -3.00% 15.245 15.434 15.434 15.245
6+445.60 15.273 -3.00% -3.00% 15.246 15.435 15.435 15.246
6+447.00 15.275 -3.00% -3.00% 15.248 15.437 15.437 15.248
6+448.40 15.276 -3.00% -3.00% 15.249 15.438 15.438 15.249
6+449.80 15.278 -3.00% -3.00% 15.251 15.440 15.440 15.251
6+451.20 15.280 -3.00% -3.00% 15.253 15.442 15.442 15.253
6+452.60 15.281 -3.00% -3.00% 15.254 15.443 15.443 15.254
6+454.00 15.283 -3.00% -3.00% 15.256 15.445 15.445 15.256
6+455.40 15.284 -3.00% -3.00% 15.257 15.446 15.446 15.257
6+456.80 15.286 -3.00% -3.00% 15.259 15.448 15.448 15.259
6+458.20 15.287 -3.00% -3.00% 15.260 15.449 15.449 15.260
6+459.60 15.289 -3.00% -3.00% 15.262 15.451 15.451 15.262
6+461.00 15.290 -3.00% -3.00% 15.263 15.452 15.452 15.263
6+462.40 15.292 -3.00% -3.00% 15.265 15.454 15.454 15.265
6+463.80 15.293 -3.00% -3.00% 15.266 15.455 15.455 15.266
6+465.20 15.295 -3.00% -3.00% 15.268 15.457 15.457 15.268
6+466.60 15.296 -3.00% -3.00% 15.269 15.458 15.458 15.269

154 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+468.00 15.298 -3.00% -3.00% 15.271 15.460 15.460 15.271


6+469.40 15.300 -3.00% -3.00% 15.273 15.462 15.462 15.273
6+470.80 15.301 -3.00% -3.00% 15.274 15.463 15.463 15.274
6+472.20 15.303 -3.00% -3.00% 15.276 15.465 15.465 15.276
6+473.60 15.304 -3.00% -3.00% 15.277 15.466 15.466 15.277
6+475.00 15.306 -3.00% -3.00% 15.279 15.468 15.468 15.279
6+476.40 15.307 -3.00% -3.00% 15.280 15.469 15.469 15.280
6+477.80 15.309 -3.00% -3.00% 15.282 15.471 15.471 15.282
6+479.20 15.310 -3.00% -3.00% 15.283 15.472 15.472 15.283
6+480.60 15.312 -3.00% -3.00% 15.285 15.474 15.474 15.285
6+482.00 15.313 -3.00% -3.00% 15.286 15.475 15.475 15.286
6+483.40 15.315 -3.00% -3.00% 15.288 15.477 15.477 15.288
6+484.80 15.316 -3.00% -3.00% 15.289 15.478 15.478 15.289
6+486.20 15.318 -3.00% -3.00% 15.291 15.480 15.480 15.291
6+487.60 15.319 -3.00% -3.00% 15.292 15.481 15.481 15.292
6+489.00 15.321 -3.00% -3.00% 15.294 15.483 15.483 15.294
6+490.40 15.323 -3.00% -3.00% 15.296 15.485 15.485 15.296
6+491.80 15.324 -3.00% -3.00% 15.297 15.486 15.486 15.297
6+493.20 15.326 -3.00% -3.00% 15.299 15.488 15.488 15.299
6+494.60 15.327 -3.00% -3.00% 15.300 15.489 15.489 15.300
6+496.00 15.329 -3.00% -3.00% 15.302 15.491 15.491 15.302
6+497.40 15.330 -3.00% -3.00% 15.303 15.492 15.492 15.303
6+498.80 15.332 -3.00% -3.00% 15.305 15.494 15.494 15.305
6+500.20 15.333 -3.00% -3.00% 15.306 15.495 15.495 15.306
6+501.60 15.335 -3.00% -3.00% 15.308 15.497 15.497 15.308
6+503.00 15.336 -3.00% -3.00% 15.309 15.498 15.498 15.309
6+504.40 15.338 -3.00% -3.00% 15.311 15.500 15.500 15.311
6+505.80 15.339 -3.00% -3.00% 15.312 15.501 15.501 15.312
6+507.20 15.341 -3.00% -3.00% 15.314 15.503 15.503 15.314
6+508.60 15.343 -3.00% -3.00% 15.316 15.505 15.505 15.316

155 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+510.00 15.344 -3.00% -3.00% 15.317 15.506 15.506 15.317


6+511.40 15.346 -3.00% -3.00% 15.319 15.508 15.508 15.319
6+512.80 15.347 -3.00% -3.00% 15.320 15.509 15.509 15.320
6+514.20 15.349 -3.00% -3.00% 15.322 15.511 15.511 15.322
6+515.60 15.350 -3.00% -3.00% 15.323 15.512 15.512 15.323
6+517.00 15.352 -3.00% -3.00% 15.325 15.514 15.514 15.325
6+518.40 15.353 -3.00% -3.00% 15.326 15.515 15.515 15.326
6+519.80 15.355 -3.00% -3.00% 15.328 15.517 15.517 15.328
6+521.20 15.356 -3.00% -3.00% 15.329 15.518 15.518 15.329
6+522.60 15.358 -3.00% -3.00% 15.331 15.520 15.520 15.331
6+524.00 15.359 -3.00% -3.00% 15.332 15.521 15.521 15.332
6+525.40 15.361 -3.00% -3.00% 15.334 15.523 15.523 15.334
6+526.80 15.363 -3.00% -3.00% 15.336 15.525 15.525 15.336
6+528.20 15.364 -3.00% -3.00% 15.337 15.526 15.526 15.337
6+529.60 15.366 -3.00% -3.00% 15.339 15.528 15.528 15.339
6+531.00 15.367 -3.00% -3.00% 15.340 15.529 15.529 15.340
6+532.40 15.369 -3.00% -3.00% 15.342 15.531 15.531 15.342
6+533.80 15.370 -3.00% -3.00% 15.343 15.532 15.532 15.343
6+535.20 15.372 -3.00% -3.00% 15.345 15.534 15.534 15.345
6+536.60 15.373 -3.00% -3.00% 15.346 15.535 15.535 15.346
6+538.00 15.375 -3.00% -3.00% 15.348 15.537 15.537 15.348
6+539.40 15.376 -3.00% -3.00% 15.349 15.538 15.538 15.349
6+540.80 15.378 -3.00% -3.00% 15.351 15.540 15.540 15.351
6+542.20 15.379 -3.00% -3.00% 15.352 15.541 15.541 15.352
6+543.60 15.381 -3.00% -3.00% 15.354 15.543 15.543 15.354
6+545.00 15.382 -3.00% -3.00% 15.355 15.544 15.544 15.355
6+546.40 15.384 -3.00% -3.00% 15.357 15.546 15.546 15.357
6+547.80 15.386 -3.00% -3.00% 15.359 15.548 15.548 15.359
6+549.20 15.387 -3.00% -3.00% 15.360 15.549 15.549 15.360
6+550.60 15.389 -3.00% -3.00% 15.362 15.551 15.551 15.362

156 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+552.00 15.390 -3.00% -3.00% 15.363 15.552 15.552 15.363


6+553.40 15.392 -3.00% -3.00% 15.365 15.554 15.554 15.365
6+554.80 15.393 -3.00% -3.00% 15.366 15.555 15.555 15.366
6+556.20 15.395 -3.00% -3.00% 15.368 15.557 15.557 15.368
6+557.60 15.396 -3.00% -3.00% 15.369 15.558 15.558 15.369
6+559.00 15.398 -3.00% -3.00% 15.371 15.560 15.560 15.371
6+560.40 15.399 -3.00% -3.00% 15.372 15.561 15.561 15.372
6+561.80 15.401 -3.00% -3.00% 15.374 15.563 15.563 15.374
6+563.20 15.402 -3.00% -3.00% 15.375 15.564 15.564 15.375
6+564.60 15.404 -3.00% -3.00% 15.377 15.566 15.566 15.377
6+566.00 15.406 -3.00% -3.00% 15.379 15.568 15.568 15.379
6+567.40 15.407 -3.00% -3.00% 15.380 15.569 15.569 15.380
6+568.80 15.409 -3.00% -3.00% 15.382 15.571 15.571 15.382
6+570.20 15.410 -3.00% -3.00% 15.383 15.572 15.572 15.383
6+571.60 15.412 -3.00% -3.00% 15.385 15.574 15.574 15.385
6+573.00 15.413 -3.00% -3.00% 15.386 15.575 15.575 15.386
6+574.40 15.415 -3.00% -3.00% 15.388 15.577 15.577 15.388
6+575.80 15.416 -3.00% -3.00% 15.389 15.578 15.578 15.389
6+577.20 15.418 -3.00% -3.00% 15.391 15.580 15.580 15.391
6+578.60 15.419 -3.00% -3.00% 15.392 15.581 15.581 15.392
6+580.00 15.421 -3.00% -3.00% 15.394 15.583 15.583 15.394
6+581.40 15.422 -3.00% -3.00% 15.395 15.584 15.584 15.395
6+582.80 15.424 -3.00% -3.00% 15.397 15.586 15.586 15.397
6+584.20 15.426 -3.00% -3.00% 15.399 15.588 15.588 15.399
6+585.60 15.427 -3.00% -3.00% 15.400 15.589 15.589 15.400
6+587.00 15.429 -3.00% -3.00% 15.402 15.591 15.591 15.402
6+588.40 15.430 -3.00% -3.00% 15.403 15.592 15.592 15.403
6+589.80 15.432 -3.00% -3.00% 15.405 15.594 15.594 15.405
6+591.20 15.433 -3.00% -3.00% 15.406 15.595 15.595 15.406
6+592.60 15.435 -3.00% -3.00% 15.408 15.597 15.597 15.408

157 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+594.00 15.436 -3.00% -3.00% 15.409 15.598 15.598 15.409


6+595.40 15.438 -3.00% -3.00% 15.411 15.600 15.600 15.411
6+596.80 15.439 -3.00% -3.00% 15.412 15.601 15.601 15.412
6+598.20 15.441 -3.00% -3.00% 15.414 15.603 15.603 15.414
6+599.60 15.442 -3.00% -3.00% 15.415 15.604 15.604 15.415
6+601.00 15.444 -3.00% -3.00% 15.417 15.606 15.606 15.417
6+602.40 15.445 -3.00% -3.00% 15.418 15.607 15.607 15.418
6+603.80 15.447 -3.00% -3.00% 15.420 15.609 15.609 15.420
6+605.20 15.449 -3.00% -3.00% 15.422 15.611 15.611 15.422
6+606.60 15.450 -3.00% -3.00% 15.423 15.612 15.612 15.423
6+608.00 15.452 -3.00% -3.00% 15.425 15.614 15.614 15.425
6+609.40 15.453 -3.00% -3.00% 15.426 15.615 15.615 15.426
6+610.80 15.455 -3.00% -3.00% 15.428 15.617 15.617 15.428
6+612.20 15.456 -3.00% -3.00% 15.429 15.618 15.618 15.429
6+613.60 15.458 -3.00% -3.00% 15.431 15.620 15.620 15.431
6+615.00 15.459 -3.00% -3.00% 15.432 15.621 15.621 15.432
6+616.40 15.461 -3.00% -3.00% 15.434 15.623 15.623 15.434
6+617.80 15.462 -3.00% -3.00% 15.435 15.624 15.624 15.435
6+619.20 15.464 -3.00% -3.00% 15.437 15.626 15.626 15.437
6+620.60 15.465 -3.00% -3.00% 15.438 15.627 15.627 15.438
6+622.00 15.467 -3.00% -3.00% 15.440 15.629 15.629 15.440
6+623.40 15.469 -3.00% -3.00% 15.442 15.631 15.631 15.442
6+624.80 15.470 -3.00% -3.00% 15.443 15.632 15.632 15.443
6+626.20 15.472 -3.00% -3.00% 15.445 15.634 15.634 15.445
6+627.60 15.473 -3.00% -3.00% 15.446 15.635 15.635 15.446
6+629.00 15.475 -3.00% -3.00% 15.448 15.637 15.637 15.448
6+630.40 15.476 -3.00% -3.00% 15.449 15.638 15.638 15.449
6+631.80 15.478 -3.00% -3.00% 15.451 15.640 15.640 15.451
6+633.20 15.479 -3.00% -3.00% 15.452 15.641 15.641 15.452
6+634.60 15.481 -3.00% -3.00% 15.454 15.643 15.643 15.454

158 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+636.00 15.482 -3.00% -3.00% 15.455 15.644 15.644 15.455


6+637.40 15.484 -3.00% -3.00% 15.457 15.646 15.646 15.457
6+638.80 15.485 -3.00% -3.00% 15.458 15.647 15.647 15.458
6+640.20 15.486 -3.00% -3.00% 15.459 15.648 15.648 15.459
6+641.60 15.487 -3.00% -3.00% 15.460 15.649 15.649 15.460
6+643.00 15.488 -3.00% -3.00% 15.461 15.650 15.650 15.461
6+644.40 15.488 -3.00% -3.00% 15.461 15.650 15.650 15.461
6+645.80 15.489 -3.00% -3.00% 15.462 15.651 15.651 15.462
6+647.20 15.489 -3.00% -3.00% 15.462 15.651 15.651 15.462
6+648.60 15.489 -3.00% -3.00% 15.462 15.651 15.651 15.462
6+650.00 15.489 -3.00% -3.00% 15.462 15.651 15.651 15.462
6+651.40 15.489 -3.00% -3.00% 15.462 15.651 15.651 15.462
6+652.80 15.489 -3.00% -3.00% 15.462 15.651 15.651 15.462
6+654.20 15.488 -3.00% -3.00% 15.461 15.650 15.650 15.461
6+655.60 15.488 -3.00% -3.00% 15.461 15.650 15.650 15.461
6+657.00 15.487 -3.00% -3.00% 15.460 15.649 15.649 15.460
6+658.40 15.486 -3.00% -3.00% 15.459 15.648 15.648 15.459
6+659.80 15.485 -3.00% -3.00% 15.458 15.647 15.647 15.458
6+661.20 15.483 -3.00% -3.00% 15.456 15.645 15.645 15.456
6+662.60 15.482 -3.00% -3.00% 15.455 15.644 15.644 15.455
6+664.00 15.480 -3.00% -3.00% 15.453 15.642 15.642 15.453
6+665.40 15.478 -3.00% -3.00% 15.451 15.640 15.640 15.451
6+666.80 15.476 -3.00% -3.00% 15.449 15.638 15.638 15.449
6+668.20 15.474 -3.00% -3.00% 15.447 15.636 15.636 15.447
6+669.60 15.472 -3.00% -3.00% 15.445 15.634 15.634 15.445
6+671.00 15.469 -3.00% -3.00% 15.442 15.631 15.631 15.442
6+672.40 15.467 -3.00% -3.00% 15.440 15.629 15.629 15.440
6+673.80 15.464 -3.00% -3.00% 15.437 15.626 15.626 15.437
6+675.20 15.461 -3.00% -3.00% 15.434 15.623 15.623 15.434
6+676.60 15.458 -3.00% -3.00% 15.431 15.620 15.620 15.431

159 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+678.00 15.455 -3.00% -3.00% 15.428 15.617 15.617 15.428


6+679.40 15.451 -3.00% -3.00% 15.424 15.613 15.613 15.424
6+680.80 15.448 -3.00% -3.00% 15.421 15.610 15.610 15.421
6+682.20 15.444 -3.00% -3.00% 15.417 15.606 15.606 15.417
6+683.60 15.440 -3.00% -3.00% 15.413 15.602 15.602 15.413
6+685.00 15.436 -3.00% -3.00% 15.409 15.598 15.598 15.409
6+686.40 15.432 -3.00% -3.00% 15.405 15.594 15.594 15.405
6+687.80 15.427 -3.00% -3.00% 15.400 15.589 15.589 15.400
6+689.20 15.423 -3.00% -3.00% 15.396 15.585 15.585 15.396
6+690.60 15.418 -3.00% -3.00% 15.391 15.580 15.580 15.391
6+692.00 15.413 -3.00% -3.00% 15.386 15.575 15.575 15.386
6+693.40 15.408 -3.00% -3.00% 15.381 15.570 15.570 15.381
6+694.80 15.403 -3.00% -3.00% 15.376 15.565 15.565 15.376
6+696.20 15.398 -3.00% -3.00% 15.371 15.560 15.560 15.371
6+697.60 15.392 -3.00% -3.00% 15.365 15.554 15.554 15.365
6+699.00 15.386 -3.00% -3.00% 15.359 15.548 15.548 15.359
6+700.40 15.381 -3.00% -3.00% 15.354 15.543 15.543 15.354
6+701.80 15.375 -3.00% -3.00% 15.348 15.537 15.537 15.348
6+703.20 15.368 -3.00% -3.00% 15.341 15.530 15.530 15.341
6+704.60 15.362 -3.00% -3.00% 15.335 15.524 15.524 15.335
6+706.00 15.356 -3.00% -3.00% 15.329 15.518 15.518 15.329
6+707.40 15.349 -3.00% -3.00% 15.322 15.511 15.511 15.322
6+708.80 15.342 -3.00% -3.00% 15.315 15.504 15.504 15.315
6+710.20 15.335 -3.00% -3.00% 15.308 15.497 15.497 15.308
6+711.60 15.329 -3.00% -3.00% 15.302 15.491 15.491 15.302
6+713.00 15.322 -3.00% -3.00% 15.295 15.484 15.484 15.295
6+714.40 15.315 -3.00% -3.00% 15.288 15.477 15.477 15.288
6+715.80 15.308 -3.00% -3.00% 15.281 15.470 15.470 15.281
6+717.20 15.301 -3.00% -3.00% 15.274 15.463 15.463 15.274
6+718.60 15.295 -3.00% -3.00% 15.268 15.457 15.457 15.268

160 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+720.00 15.288 -3.00% -3.00% 15.261 15.450 15.450 15.261


6+721.40 15.281 -3.00% -3.00% 15.254 15.443 15.443 15.254
6+722.80 15.274 -3.00% -3.00% 15.247 15.436 15.436 15.247
6+724.20 15.267 -3.00% -3.00% 15.240 15.429 15.429 15.240
6+725.60 15.261 -3.00% -3.00% 15.234 15.423 15.423 15.234
6+727.00 15.254 -3.00% -3.00% 15.227 15.416 15.416 15.227
6+728.40 15.247 -3.00% -3.00% 15.220 15.409 15.409 15.220
6+729.80 15.240 -3.00% -3.00% 15.213 15.402 15.402 15.213
6+731.20 15.233 -3.00% -3.00% 15.206 15.395 15.395 15.206
6+732.60 15.227 -3.00% -3.00% 15.200 15.389 15.389 15.200
6+734.00 15.220 -3.00% -3.00% 15.193 15.382 15.382 15.193
6+735.40 15.213 -3.00% -3.00% 15.186 15.375 15.375 15.186
6+736.80 15.206 -3.00% -3.00% 15.179 15.368 15.368 15.179
6+738.20 15.199 -3.00% -3.00% 15.172 15.361 15.361 15.172
6+739.60 15.193 -3.00% -3.00% 15.166 15.355 15.355 15.166
6+741.00 15.186 -3.00% -3.00% 15.159 15.348 15.348 15.159
6+742.40 15.179 -3.00% -3.00% 15.152 15.341 15.341 15.152
6+743.80 15.172 -3.00% -3.00% 15.145 15.334 15.334 15.145
6+745.20 15.165 -3.00% -3.00% 15.138 15.327 15.327 15.138
6+746.60 15.159 -3.00% -3.00% 15.132 15.321 15.321 15.132
6+748.00 15.152 -3.00% -3.00% 15.125 15.314 15.314 15.125
6+749.40 15.145 -3.00% -3.00% 15.118 15.307 15.307 15.118
6+750.80 15.138 -3.00% -3.00% 15.111 15.300 15.300 15.111
6+752.20 15.131 -3.00% -3.00% 15.104 15.293 15.293 15.104
6+753.60 15.125 -3.00% -3.00% 15.098 15.287 15.287 15.098
6+755.00 15.118 -3.00% -3.00% 15.091 15.280 15.280 15.091
6+756.40 15.111 -3.00% -3.00% 15.084 15.273 15.273 15.084
6+757.80 15.104 -3.00% -3.00% 15.077 15.266 15.266 15.077
6+759.20 15.097 -3.00% -3.00% 15.070 15.259 15.259 15.070
6+760.60 15.091 -3.00% -3.00% 15.064 15.253 15.253 15.064

161 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+762.00 15.084 -3.00% -3.00% 15.057 15.246 15.246 15.057


6+763.40 15.077 -3.00% -3.00% 15.050 15.239 15.239 15.050
6+764.80 15.070 -3.00% -3.00% 15.043 15.232 15.232 15.043
6+766.20 15.063 -3.00% -3.00% 15.036 15.225 15.225 15.036
6+767.60 15.057 -3.00% -3.00% 15.030 15.219 15.219 15.030
6+769.00 15.050 -3.00% -3.00% 15.023 15.212 15.212 15.023
6+770.40 15.043 -3.00% -3.00% 15.016 15.205 15.205 15.016
6+771.80 15.036 -3.00% -3.00% 15.009 15.198 15.198 15.009
6+773.20 15.029 -3.00% -3.00% 15.002 15.191 15.191 15.002
6+774.60 15.023 -3.00% -3.00% 14.996 15.185 15.185 14.996
6+776.00 15.016 -3.00% -3.00% 14.989 15.178 15.178 14.989
6+777.40 15.009 -3.00% -3.00% 14.982 15.171 15.171 14.982
6+778.80 15.002 -3.00% -3.00% 14.975 15.164 15.164 14.975
6+780.20 14.995 -3.00% -3.00% 14.968 15.157 15.157 14.968
6+781.60 14.989 -3.00% -3.00% 14.962 15.151 15.151 14.962
6+783.00 14.982 -3.00% -3.00% 14.955 15.144 15.144 14.955
6+784.40 14.975 -3.00% -3.00% 14.948 15.137 15.137 14.948
6+785.80 14.968 -3.00% -3.00% 14.941 15.130 15.130 14.941
6+787.20 14.961 -3.00% -3.00% 14.934 15.123 15.123 14.934
6+788.60 14.955 -3.00% -3.00% 14.928 15.117 15.117 14.928
6+790.00 14.948 -3.00% -3.00% 14.921 15.110 15.110 14.921
6+791.40 14.941 -3.00% -3.00% 14.914 15.103 15.103 14.914
6+792.80 14.934 -3.00% -3.00% 14.907 15.096 15.096 14.907
6+794.20 14.927 -3.00% -3.00% 14.900 15.089 15.089 14.900
6+795.60 14.921 -3.00% -3.00% 14.894 15.083 15.083 14.894
6+797.00 14.914 -3.00% -3.00% 14.887 15.076 15.076 14.887
6+798.40 14.907 -3.00% -3.00% 14.880 15.069 15.069 14.880
6+799.80 14.900 -3.00% -3.00% 14.873 15.062 15.062 14.873
6+801.20 14.893 -3.00% -3.00% 14.866 15.055 15.055 14.866
6+802.60 14.887 -3.00% -3.00% 14.860 15.049 15.049 14.860

162 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+804.00 14.880 -3.00% -3.00% 14.853 15.042 15.042 14.853


6+805.40 14.873 -3.00% -3.00% 14.846 15.035 15.035 14.846
6+806.80 14.866 -3.00% -3.00% 14.839 15.028 15.028 14.839
6+808.20 14.859 -3.00% -3.00% 14.832 15.021 15.021 14.832
6+809.60 14.853 -3.00% -3.00% 14.826 15.015 15.015 14.826
6+811.00 14.846 -3.00% -3.00% 14.819 15.008 15.008 14.819
6+812.40 14.839 -3.00% -3.00% 14.812 15.001 15.001 14.812
6+813.80 14.832 -3.00% -3.00% 14.805 14.994 14.994 14.805
6+815.20 14.825 -3.00% -3.00% 14.798 14.987 14.987 14.798
6+816.60 14.819 -3.00% -3.00% 14.792 14.981 14.981 14.792
6+818.00 14.812 -3.00% -3.00% 14.785 14.974 14.974 14.785
6+819.40 14.805 -3.00% -3.00% 14.778 14.967 14.967 14.778
6+820.80 14.798 -3.00% -3.00% 14.771 14.960 14.960 14.771
6+822.20 14.791 -3.00% -3.00% 14.764 14.953 14.953 14.764
6+823.60 14.785 -3.00% -3.00% 14.758 14.947 14.947 14.758
6+825.00 14.778 -3.00% -3.00% 14.751 14.940 14.940 14.751
6+826.40 14.771 -3.00% -3.00% 14.744 14.933 14.933 14.744
6+827.80 14.764 -3.00% -3.00% 14.737 14.926 14.926 14.737
6+829.20 14.757 -3.00% -3.00% 14.730 14.919 14.919 14.730
6+830.60 14.751 -3.00% -3.00% 14.724 14.913 14.913 14.724
6+832.00 14.744 -3.00% -3.00% 14.717 14.906 14.906 14.717
6+833.40 14.737 -3.00% -3.00% 14.710 14.899 14.899 14.710
6+834.80 14.730 -3.00% -3.00% 14.703 14.892 14.892 14.703
6+836.20 14.723 -3.00% -3.00% 14.696 14.885 14.885 14.696
6+837.60 14.717 -3.00% -3.00% 14.690 14.879 14.879 14.690
6+839.00 14.710 -3.00% -3.00% 14.683 14.872 14.872 14.683
6+840.40 14.703 -3.00% -3.00% 14.676 14.865 14.865 14.676
6+841.80 14.696 -3.00% -3.00% 14.669 14.858 14.858 14.669
6+843.20 14.689 -3.00% -3.00% 14.662 14.851 14.851 14.662
6+844.60 14.683 -3.00% -3.00% 14.656 14.845 14.845 14.656

163 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+846.00 14.676 -3.00% -3.00% 14.649 14.838 14.838 14.649


6+847.40 14.669 -3.00% -3.00% 14.642 14.831 14.831 14.642
6+848.80 14.662 -3.00% -3.00% 14.635 14.824 14.824 14.635
6+850.20 14.655 -3.00% -3.00% 14.628 14.817 14.817 14.628
6+851.60 14.649 -3.00% -3.00% 14.622 14.811 14.811 14.622
6+853.00 14.642 -3.00% -3.00% 14.615 14.804 14.804 14.615
6+854.40 14.635 -3.00% -3.00% 14.608 14.797 14.797 14.608
6+855.80 14.628 -3.00% -3.00% 14.601 14.790 14.790 14.601
6+857.20 14.621 -3.00% -3.00% 14.594 14.783 14.783 14.594
6+858.60 14.615 -3.00% -3.00% 14.588 14.777 14.777 14.588
6+860.00 14.608 -3.00% -3.00% 14.581 14.770 14.770 14.581
6+861.40 14.601 -3.00% -3.00% 14.574 14.763 14.763 14.574
6+862.80 14.594 -3.00% -3.00% 14.567 14.756 14.756 14.567
6+864.20 14.587 -3.00% -3.00% 14.560 14.749 14.749 14.560
6+865.60 14.581 -3.00% -3.00% 14.554 14.743 14.743 14.554
6+867.00 14.574 -3.00% -3.00% 14.547 14.736 14.736 14.547
6+868.40 14.567 -3.00% -3.00% 14.540 14.729 14.729 14.540
6+869.80 14.560 -3.00% -3.00% 14.533 14.722 14.722 14.533
6+871.20 14.553 -3.00% -3.00% 14.526 14.715 14.715 14.526
6+872.60 14.547 -3.00% -3.00% 14.520 14.709 14.709 14.520
6+874.00 14.540 -3.00% -3.00% 14.513 14.702 14.702 14.513
6+875.40 14.533 -3.00% -3.00% 14.506 14.695 14.695 14.506
6+876.80 14.526 -3.00% -3.00% 14.499 14.688 14.688 14.499
6+878.20 14.519 -3.00% -3.00% 14.492 14.681 14.681 14.492
6+879.60 14.513 -3.00% -3.00% 14.486 14.675 14.675 14.486
6+881.00 14.506 -3.00% -3.00% 14.479 14.668 14.668 14.479
6+882.40 14.499 -3.00% -3.00% 14.472 14.661 14.661 14.472
6+883.80 14.492 -3.00% -3.00% 14.465 14.654 14.654 14.465
6+885.20 14.485 -3.00% -3.00% 14.458 14.647 14.647 14.458
6+886.60 14.479 -3.00% -3.00% 14.452 14.641 14.641 14.452

164 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+888.00 14.472 -3.00% -3.00% 14.445 14.634 14.634 14.445


6+889.40 14.465 -3.00% -3.00% 14.438 14.627 14.627 14.438
6+890.80 14.458 -3.00% -3.00% 14.431 14.620 14.620 14.431
6+892.20 14.451 -3.00% -3.00% 14.424 14.613 14.613 14.424
6+893.60 14.445 -3.00% -3.00% 14.418 14.607 14.607 14.418
6+895.00 14.438 -3.00% -3.00% 14.411 14.600 14.600 14.411
6+896.40 14.431 -3.00% -3.00% 14.404 14.593 14.593 14.404
6+897.80 14.424 -3.00% -3.00% 14.397 14.586 14.586 14.397
6+899.20 14.417 -3.00% -3.00% 14.390 14.579 14.579 14.390
6+900.60 14.411 -3.00% -3.00% 14.384 14.573 14.573 14.384
6+902.00 14.404 -3.00% -3.00% 14.377 14.566 14.566 14.377
6+903.40 14.397 -3.00% -3.00% 14.370 14.559 14.559 14.370
6+904.80 14.390 -3.00% -3.00% 14.363 14.552 14.552 14.363
6+906.20 14.383 -3.00% -3.00% 14.356 14.545 14.545 14.356
6+907.60 14.377 -3.00% -3.00% 14.350 14.539 14.539 14.350
6+909.00 14.370 -3.00% -3.00% 14.343 14.532 14.532 14.343
6+910.40 14.363 -3.00% -3.00% 14.336 14.525 14.525 14.336
6+911.80 14.356 -3.00% -3.00% 14.329 14.518 14.518 14.329
6+913.20 14.349 -3.00% -3.00% 14.322 14.511 14.511 14.322
6+914.60 14.343 -3.00% -3.00% 14.316 14.505 14.505 14.316
6+916.00 14.336 -3.00% -3.00% 14.309 14.498 14.498 14.309
6+917.40 14.329 -3.00% -3.00% 14.302 14.491 14.491 14.302
6+918.80 14.322 -3.00% -3.00% 14.295 14.484 14.484 14.295
6+920.20 14.316 -3.00% -3.00% 14.289 14.478 14.478 14.289
6+921.60 14.309 -3.00% -3.00% 14.282 14.471 14.471 14.282
6+923.00 14.302 -3.00% -3.00% 14.275 14.464 14.464 14.275
6+924.40 14.295 -3.00% -3.00% 14.268 14.457 14.457 14.268
6+925.80 14.288 -3.00% -3.00% 14.261 14.450 14.450 14.261
6+927.20 14.282 -3.00% -3.00% 14.255 14.444 14.444 14.255
6+928.60 14.275 -3.00% -3.00% 14.248 14.437 14.437 14.248

165 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+930.00 14.268 -3.00% -3.00% 14.241 14.430 14.430 14.241


6+931.40 14.261 -3.00% -3.00% 14.234 14.423 14.423 14.234
6+932.80 14.254 -3.00% -3.00% 14.227 14.416 14.416 14.227
6+934.20 14.248 -3.00% -3.00% 14.221 14.410 14.410 14.221
6+935.60 14.241 -3.00% -3.00% 14.214 14.403 14.403 14.214
6+937.00 14.234 -3.00% -3.00% 14.207 14.396 14.396 14.207
6+938.40 14.227 -3.00% -3.00% 14.200 14.389 14.389 14.200
6+939.80 14.220 -3.00% -3.00% 14.193 14.382 14.382 14.193
6+941.20 14.214 -3.00% -3.00% 14.187 14.376 14.376 14.187
6+942.60 14.207 -3.00% -3.00% 14.180 14.369 14.369 14.180
6+944.00 14.200 -3.00% -3.00% 14.173 14.362 14.362 14.173
6+945.40 14.193 -3.00% -3.00% 14.166 14.355 14.355 14.166
6+946.80 14.186 -3.00% -3.00% 14.159 14.348 14.348 14.159
6+948.20 14.180 -3.00% -3.00% 14.153 14.342 14.342 14.153
6+949.60 14.173 -3.00% -3.00% 14.146 14.335 14.335 14.146
6+951.00 14.166 -3.00% -3.00% 14.139 14.328 14.328 14.139
6+952.40 14.159 -3.00% -3.00% 14.132 14.321 14.321 14.132
6+953.80 14.152 -3.00% -3.00% 14.125 14.314 14.314 14.125
6+955.20 14.146 -3.00% -3.00% 14.119 14.308 14.308 14.119
6+956.60 14.139 -3.00% -3.00% 14.112 14.301 14.301 14.112
6+958.00 14.132 -3.00% -3.00% 14.105 14.294 14.294 14.105
6+959.40 14.125 -3.00% -3.00% 14.098 14.287 14.287 14.098
6+960.80 14.118 -3.00% -3.00% 14.091 14.280 14.280 14.091
6+962.20 14.112 -3.00% -3.00% 14.085 14.274 14.274 14.085
6+963.60 14.105 -3.00% -3.00% 14.078 14.267 14.267 14.078
6+965.00 14.098 -3.00% -3.00% 14.071 14.260 14.260 14.071
6+966.40 14.091 -3.00% -3.00% 14.064 14.253 14.253 14.064
6+967.80 14.084 -3.00% -3.00% 14.057 14.246 14.246 14.057
6+969.20 14.078 -3.00% -3.00% 14.051 14.240 14.240 14.051
6+970.60 14.071 -3.00% -3.00% 14.044 14.233 14.233 14.044

166 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

6+972.00 14.064 -3.00% -3.00% 14.037 14.226 14.226 14.037


6+973.40 14.057 -3.00% -3.00% 14.030 14.219 14.219 14.030
6+974.80 14.050 -3.00% -3.00% 14.023 14.212 14.212 14.023
6+976.20 14.044 -3.00% -3.00% 14.017 14.206 14.206 14.017
6+977.60 14.037 -3.00% -3.00% 14.010 14.199 14.199 14.010
6+979.00 14.030 -3.00% -3.00% 14.003 14.192 14.192 14.003
6+980.40 14.023 -3.00% -3.00% 13.996 14.185 14.185 13.996
6+981.80 14.016 -3.00% -3.00% 13.989 14.178 14.178 13.989
6+983.20 14.010 -3.00% -3.00% 13.983 14.172 14.172 13.983
6+984.60 14.003 -3.00% -3.00% 13.976 14.165 14.165 13.976
6+986.00 13.996 -3.00% -3.00% 13.969 14.158 14.158 13.969
6+987.40 13.989 -3.00% -3.00% 13.962 14.151 14.151 13.962
6+988.80 13.982 -3.00% -3.00% 13.955 14.144 14.144 13.955
6+990.20 13.976 -3.00% -3.00% 13.949 14.138 14.138 13.949
6+991.60 13.969 -3.00% -3.00% 13.942 14.131 14.131 13.942
6+993.00 13.962 -3.00% -3.00% 13.935 14.124 14.124 13.935
6+994.40 13.955 -3.00% -3.00% 13.928 14.117 14.117 13.928
6+995.80 13.948 -3.00% -3.00% 13.921 14.110 14.110 13.921
6+997.20 13.942 -3.00% -3.00% 13.915 14.104 14.104 13.915
6+998.60 13.935 -3.00% -3.00% 13.908 14.097 14.097 13.908
7+000.00 13.928 -3.00% -3.00% 13.901 14.090 14.090 13.901
7+001.40 13.921 -3.00% -3.00% 13.894 14.083 14.083 13.894
7+002.80 13.914 -3.00% -3.00% 13.887 14.076 14.076 13.887
7+004.20 13.908 -3.00% -3.00% 13.881 14.070 14.070 13.881
7+005.60 13.901 -3.00% -3.00% 13.874 14.063 14.063 13.874
7+007.00 13.894 -3.00% -3.00% 13.867 14.056 14.056 13.867
7+008.40 13.889 -3.00% -3.00% 13.862 14.051 14.051 13.862
7+009.80 13.887 -3.00% -3.00% 13.860 14.049 14.049 13.860
7+011.20 13.886 -3.00% -3.00% 13.859 14.048 14.048 13.859
7+012.60 13.888 -3.00% -3.00% 13.861 14.050 14.050 13.861

167 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+014.00 13.893 -3.00% -3.00% 13.866 14.055 14.055 13.866


7+015.40 13.899 -3.00% -3.00% 13.872 14.061 14.061 13.872
7+016.80 13.908 -3.00% -3.00% 13.881 14.070 14.070 13.881
7+018.20 13.919 -3.00% -3.00% 13.892 14.081 14.081 13.892
7+019.60 13.933 -3.00% -3.00% 13.906 14.095 14.095 13.906
7+021.00 13.949 -3.00% -3.00% 13.922 14.111 14.111 13.922
7+022.40 13.967 -3.00% -3.00% 13.940 14.129 14.129 13.940
7+023.80 13.988 -3.00% -3.00% 13.961 14.150 14.150 13.961
7+025.20 14.011 -3.00% -3.00% 13.984 14.173 14.173 13.984
7+026.60 14.036 -3.00% -3.00% 14.009 14.198 14.198 14.009
7+028.00 14.063 -3.00% -3.00% 14.036 14.225 14.225 14.036
7+029.40 14.093 -3.00% -3.00% 14.066 14.255 14.255 14.066
7+030.80 14.125 -3.00% -3.00% 14.098 14.287 14.287 14.098
7+032.20 14.160 -3.00% -3.00% 14.133 14.322 14.322 14.133
7+033.60 14.197 -3.00% -3.00% 14.170 14.359 14.359 14.170
7+035.00 14.236 -3.00% -3.00% 14.209 14.398 14.398 14.209
7+036.40 14.277 -3.00% -3.00% 14.250 14.439 14.439 14.250
7+037.80 14.321 -3.00% -3.00% 14.294 14.483 14.483 14.294
7+039.20 14.367 -3.00% -3.00% 14.340 14.529 14.529 14.340
7+040.60 14.415 -3.00% -3.00% 14.388 14.577 14.577 14.388
7+042.00 14.466 -3.00% -3.00% 14.439 14.628 14.628 14.439
7+043.40 14.519 -3.00% -3.00% 14.492 14.681 14.681 14.492
7+044.80 14.575 -3.00% -3.00% 14.548 14.737 14.737 14.548
7+046.20 14.632 -3.00% -3.00% 14.605 14.794 14.794 14.605
7+047.60 14.692 -3.00% -3.00% 14.665 14.854 14.854 14.665
7+049.00 14.754 -3.00% -3.00% 14.727 14.916 14.916 14.727
7+050.40 14.819 -3.00% -3.00% 14.792 14.981 14.981 14.792
7+051.80 14.886 -3.00% -3.00% 14.859 15.048 15.048 14.859
7+053.20 14.955 -3.00% -3.00% 14.928 15.117 15.117 14.928
7+054.60 15.027 -3.00% -3.00% 15.000 15.189 15.189 15.000

168 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+056.00 15.101 -3.00% -3.00% 15.074 15.263 15.263 15.074


7+057.40 15.177 -3.00% -3.00% 15.150 15.339 15.339 15.150
7+058.80 15.256 -3.00% -3.00% 15.229 15.418 15.418 15.229
7+060.20 15.336 -3.00% -3.00% 15.309 15.498 15.498 15.309
7+061.60 15.420 -3.00% -3.00% 15.393 15.582 15.582 15.393
7+063.00 15.505 -3.00% -3.00% 15.478 15.667 15.667 15.478
7+064.40 15.593 -3.00% -3.00% 15.566 15.755 15.755 15.566
7+065.80 15.682 -3.00% -3.00% 15.655 15.844 15.844 15.655
7+067.20 15.772 -3.00% -3.00% 15.745 15.934 15.934 15.745
7+068.60 15.862 -3.00% -3.00% 15.835 16.024 16.024 15.835
7+070.00 15.951 -3.00% -3.00% 15.924 16.113 16.113 15.924
7+071.40 16.041 -3.00% -3.00% 16.014 16.203 16.203 16.014
7+072.80 16.130 -2.94% -3.00% 16.106 16.291 16.292 16.103
7+074.20 16.220 -2.78% -3.00% 16.204 16.379 16.382 16.193
7+075.60 16.310 -2.62% -3.00% 16.302 16.467 16.472 16.283
7+077.00 16.399 -2.46% -3.00% 16.398 16.553 16.561 16.372
7+078.40 16.489 -2.31% -3.00% 16.496 16.641 16.651 16.462
7+079.80 16.578 -2.15% -3.00% 16.593 16.728 16.740 16.551
7+081.20 16.668 -1.99% -3.00% 16.690 16.816 16.830 16.641
7+082.60 16.758 -1.83% -3.00% 16.788 16.904 16.920 16.731
7+084.00 16.847 -1.67% -3.00% 16.885 16.990 17.009 16.820
7+085.40 16.937 -1.52% -3.00% 16.983 17.078 17.099 16.910
7+086.80 17.026 -1.36% -3.00% 17.079 17.165 17.188 16.999
7+088.20 17.116 -1.20% -3.00% 17.177 17.253 17.278 17.089
7+089.60 17.206 -1.04% -3.00% 17.275 17.341 17.368 17.179
7+091.00 17.295 -0.88% -3.00% 17.372 17.427 17.457 17.268
7+092.40 17.385 -0.73% -3.00% 17.469 17.515 17.547 17.358
7+093.80 17.474 -0.57% -3.00% 17.566 17.602 17.636 17.447
7+095.20 17.564 -0.41% -3.00% 17.664 17.690 17.726 17.537
7+096.60 17.654 -0.25% -3.00% 17.762 17.778 17.816 17.627

169 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+098.00 17.743 -0.09% -3.00% 17.858 17.864 17.905 17.716


7+099.40 17.833 0.06% -3.00% 17.956 17.952 17.995 17.806
7+100.80 17.922 0.22% -3.00% 18.053 18.039 18.084 17.895
7+102.20 18.012 0.38% -3.00% 18.151 18.127 18.174 17.985
7+103.60 18.102 0.54% -3.00% 18.248 18.214 18.264 18.075
7+105.00 18.191 0.69% -3.00% 18.345 18.301 18.353 18.164
7+106.40 18.281 0.85% -3.00% 18.443 18.389 18.443 18.254
7+107.80 18.370 1.01% -3.00% 18.540 18.476 18.532 18.343
7+109.20 18.460 1.17% -3.00% 18.637 18.564 18.622 18.433
7+110.60 18.550 1.33% -3.00% 18.735 18.651 18.712 18.523
7+112.00 18.639 1.48% -3.00% 18.832 18.738 18.801 18.612
7+113.40 18.729 1.64% -3.00% 18.929 18.826 18.891 18.702
7+114.80 18.818 1.80% -3.00% 19.026 18.913 18.980 18.791
7+116.20 18.908 1.96% -3.00% 19.124 19.001 19.070 18.881
7+117.60 18.998 2.12% -3.00% 19.222 19.088 19.160 18.971
7+119.00 19.087 2.27% -3.00% 19.318 19.175 19.249 19.060
7+120.40 19.177 2.43% -3.00% 19.416 19.263 19.339 19.150
7+121.80 19.266 2.59% -3.00% 19.513 19.350 19.428 19.239
7+123.20 19.356 2.75% -3.00% 19.611 19.438 19.518 19.329
7+124.60 19.446 2.91% -3.00% 19.708 19.525 19.608 19.419
7+126.00 19.535 3.06% -3.06% 19.805 19.612 19.698 19.505
7+127.40 19.625 3.22% -3.22% 19.903 19.700 19.790 19.587
7+128.80 19.714 3.38% -3.38% 20.000 19.787 19.881 19.668
7+130.20 19.804 3.54% -3.54% 20.097 19.874 19.974 19.751
7+131.60 19.894 3.70% -3.70% 20.195 19.962 20.066 19.833
7+133.00 19.983 3.85% -3.85% 20.292 20.049 20.157 19.914
7+134.40 20.073 4.01% -4.01% 20.390 20.137 20.249 19.996
7+135.80 20.162 4.17% -4.17% 20.486 20.224 20.340 20.078
7+137.20 20.251 4.33% -4.33% 20.583 20.310 20.432 20.159
7+138.60 20.339 4.40% -4.40% 20.675 20.397 20.521 20.243

170 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+140.00 20.425 4.40% -4.40% 20.761 20.483 20.607 20.329


7+141.40 20.511 4.40% -4.40% 20.847 20.569 20.693 20.415
7+142.80 20.595 4.40% -4.40% 20.931 20.653 20.777 20.499
7+144.20 20.678 4.40% -4.40% 21.014 20.736 20.860 20.582
7+145.60 20.760 4.40% -4.40% 21.096 20.818 20.942 20.664
7+147.00 20.841 4.40% -4.40% 21.177 20.899 21.023 20.745
7+148.40 20.920 4.40% -4.40% 21.256 20.978 21.102 20.824
7+149.80 20.999 4.40% -4.40% 21.335 21.057 21.181 20.903
7+151.20 21.076 4.40% -4.40% 21.412 21.134 21.258 20.980
7+152.60 21.152 4.40% -4.40% 21.488 21.210 21.334 21.056
7+154.00 21.227 4.40% -4.40% 21.563 21.285 21.409 21.131
7+155.40 21.301 4.40% -4.40% 21.637 21.359 21.483 21.205
7+156.80 21.373 4.40% -4.40% 21.709 21.431 21.555 21.277
7+158.20 21.445 4.40% -4.40% 21.781 21.503 21.627 21.349
7+159.60 21.515 4.40% -4.40% 21.851 21.573 21.697 21.419
7+161.00 21.584 4.40% -4.40% 21.920 21.642 21.766 21.488
7+162.40 21.652 4.40% -4.40% 21.988 21.710 21.834 21.556
7+163.80 21.719 4.40% -4.40% 22.055 21.777 21.901 21.623
7+165.20 21.785 4.40% -4.40% 22.121 21.843 21.967 21.689
7+166.60 21.850 4.40% -4.40% 22.186 21.908 22.032 21.754
7+168.00 21.913 4.40% -4.40% 22.249 21.971 22.095 21.817
7+169.40 21.975 4.40% -4.40% 22.311 22.033 22.157 21.879
7+170.80 22.036 4.40% -4.40% 22.372 22.094 22.218 21.940
7+172.20 22.096 4.40% -4.40% 22.432 22.154 22.278 22.000
7+173.60 22.155 4.40% -4.40% 22.491 22.213 22.337 22.059
7+175.00 22.213 4.40% -4.40% 22.549 22.271 22.395 22.117
7+176.40 22.269 4.40% -4.40% 22.605 22.327 22.451 22.173
7+177.80 22.325 4.40% -4.40% 22.661 22.383 22.507 22.229
7+179.20 22.379 4.40% -4.40% 22.715 22.437 22.561 22.283
7+180.60 22.432 4.40% -4.40% 22.768 22.490 22.614 22.336

171 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+182.00 22.484 4.40% -4.40% 22.820 22.542 22.666 22.388


7+183.40 22.535 4.40% -4.40% 22.871 22.593 22.717 22.439
7+184.80 22.584 4.40% -4.40% 22.920 22.642 22.766 22.488
7+186.20 22.633 4.40% -4.40% 22.969 22.691 22.815 22.537
7+187.60 22.680 4.40% -4.40% 23.016 22.738 22.862 22.584
7+189.00 22.726 4.40% -4.40% 23.062 22.784 22.908 22.630
7+190.40 22.771 4.40% -4.40% 23.107 22.829 22.953 22.675
7+191.80 22.815 4.40% -4.40% 23.151 22.873 22.997 22.719
7+193.20 22.858 4.40% -4.40% 23.194 22.916 23.040 22.762
7+194.60 22.899 4.40% -4.40% 23.235 22.957 23.081 22.803
7+196.00 22.939 4.40% -4.40% 23.275 22.997 23.121 22.843
7+197.40 22.979 4.40% -4.40% 23.315 23.037 23.161 22.883
7+198.80 23.017 4.40% -4.40% 23.353 23.075 23.199 22.921
7+200.20 23.054 4.40% -4.40% 23.390 23.112 23.236 22.958
7+201.60 23.089 4.40% -4.40% 23.425 23.147 23.271 22.993
7+203.00 23.124 4.40% -4.40% 23.460 23.182 23.306 23.028
7+204.40 23.157 4.40% -4.40% 23.493 23.215 23.339 23.061
7+205.80 23.190 4.40% -4.40% 23.526 23.248 23.372 23.094
7+207.20 23.221 4.40% -4.40% 23.557 23.279 23.403 23.125
7+208.60 23.251 4.40% -4.40% 23.587 23.309 23.433 23.155
7+210.00 23.280 4.40% -4.40% 23.616 23.338 23.462 23.184
7+211.40 23.307 4.40% -4.40% 23.643 23.365 23.489 23.211
7+212.80 23.334 4.40% -4.40% 23.670 23.392 23.516 23.238
7+214.20 23.359 4.40% -4.40% 23.695 23.417 23.541 23.263
7+215.60 23.384 4.40% -4.40% 23.720 23.442 23.566 23.288
7+217.00 23.407 4.40% -4.40% 23.743 23.465 23.589 23.311
7+218.40 23.429 4.40% -4.40% 23.765 23.487 23.611 23.333
7+219.80 23.449 4.40% -4.40% 23.785 23.507 23.631 23.353
7+221.20 23.469 4.40% -4.40% 23.805 23.527 23.651 23.373
7+222.60 23.487 4.40% -4.40% 23.823 23.545 23.669 23.391

172 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+224.00 23.505 4.40% -4.40% 23.841 23.563 23.687 23.409


7+225.40 23.521 4.40% -4.40% 23.857 23.579 23.703 23.425
7+226.80 23.536 4.40% -4.40% 23.872 23.594 23.718 23.440
7+228.20 23.550 4.40% -4.40% 23.886 23.608 23.732 23.454
7+229.60 23.562 4.40% -4.40% 23.898 23.620 23.744 23.466
7+231.00 23.574 4.40% -4.40% 23.910 23.632 23.756 23.478
7+232.40 23.584 4.40% -4.40% 23.920 23.642 23.766 23.488
7+233.80 23.594 4.40% -4.40% 23.930 23.652 23.776 23.498
7+235.20 23.602 4.40% -4.40% 23.938 23.660 23.784 23.506
7+236.60 23.609 4.40% -4.40% 23.945 23.667 23.791 23.513
7+238.00 23.614 4.40% -4.40% 23.950 23.672 23.796 23.518
7+239.40 23.619 4.40% -4.40% 23.955 23.677 23.801 23.523
7+240.80 23.622 4.40% -4.40% 23.958 23.680 23.804 23.526
7+242.20 23.625 4.40% -4.40% 23.961 23.683 23.807 23.529
7+243.60 23.626 4.40% -4.40% 23.962 23.684 23.808 23.530
7+245.00 23.626 4.40% -4.40% 23.962 23.684 23.808 23.530
7+246.40 23.625 4.40% -4.40% 23.961 23.683 23.807 23.529
7+247.80 23.623 4.40% -4.40% 23.959 23.681 23.805 23.527
7+249.20 23.619 4.40% -4.40% 23.955 23.677 23.801 23.523
7+250.60 23.614 4.40% -4.40% 23.950 23.672 23.796 23.518
7+252.00 23.609 4.40% -4.40% 23.945 23.667 23.791 23.513
7+253.40 23.602 4.40% -4.40% 23.938 23.660 23.784 23.506
7+254.80 23.594 4.40% -4.40% 23.930 23.652 23.776 23.498
7+256.20 23.585 4.40% -4.40% 23.921 23.643 23.767 23.489
7+257.60 23.574 4.40% -4.40% 23.910 23.632 23.756 23.478
7+259.00 23.563 4.40% -4.40% 23.899 23.621 23.745 23.467
7+260.40 23.550 4.40% -4.40% 23.886 23.608 23.732 23.454
7+261.80 23.536 4.40% -4.40% 23.872 23.594 23.718 23.440
7+263.20 23.521 4.40% -4.40% 23.857 23.579 23.703 23.425
7+264.60 23.505 4.40% -4.40% 23.841 23.563 23.687 23.409

173 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+266.00 23.488 4.40% -4.40% 23.824 23.546 23.670 23.392


7+267.40 23.469 4.40% -4.40% 23.805 23.527 23.651 23.373
7+268.80 23.450 4.40% -4.40% 23.786 23.508 23.632 23.354
7+270.20 23.429 4.40% -4.40% 23.765 23.487 23.611 23.333
7+271.60 23.407 4.40% -4.40% 23.743 23.465 23.589 23.311
7+273.00 23.384 4.40% -4.40% 23.720 23.442 23.566 23.288
7+274.40 23.360 4.40% -4.40% 23.696 23.418 23.542 23.264
7+275.80 23.335 4.40% -4.40% 23.671 23.393 23.517 23.239
7+277.20 23.308 4.40% -4.40% 23.644 23.366 23.490 23.212
7+278.60 23.280 4.40% -4.40% 23.616 23.338 23.462 23.184
7+280.00 23.252 4.40% -4.40% 23.588 23.310 23.434 23.156
7+281.40 23.222 4.40% -4.40% 23.558 23.280 23.404 23.126
7+282.80 23.191 4.40% -4.40% 23.527 23.249 23.373 23.095
7+284.20 23.158 4.40% -4.40% 23.494 23.216 23.340 23.062
7+285.60 23.125 4.40% -4.40% 23.461 23.183 23.307 23.029
7+287.00 23.090 4.40% -4.40% 23.426 23.148 23.272 22.994
7+288.40 23.055 4.40% -4.40% 23.391 23.113 23.237 22.959
7+289.80 23.018 4.40% -4.40% 23.354 23.076 23.200 22.922
7+291.20 22.980 4.40% -4.40% 23.316 23.038 23.162 22.884
7+292.60 22.940 4.40% -4.40% 23.276 22.998 23.122 22.844
7+294.00 22.900 4.40% -4.40% 23.236 22.958 23.082 22.804
7+295.40 22.859 4.40% -4.40% 23.195 22.917 23.041 22.763
7+296.80 22.816 4.40% -4.40% 23.152 22.874 22.998 22.720
7+298.20 22.772 4.40% -4.40% 23.108 22.830 22.954 22.676
7+299.60 22.727 4.40% -4.40% 23.063 22.785 22.909 22.631
7+301.00 22.681 4.40% -4.40% 23.017 22.739 22.863 22.585
7+302.40 22.634 4.40% -4.40% 22.970 22.692 22.816 22.538
7+303.80 22.586 4.40% -4.40% 22.922 22.644 22.768 22.490
7+305.20 22.536 4.40% -4.40% 22.872 22.594 22.718 22.440
7+306.60 22.485 4.40% -4.40% 22.821 22.543 22.667 22.389

174 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+308.00 22.433 4.40% -4.40% 22.769 22.491 22.615 22.337


7+309.40 22.380 4.40% -4.40% 22.716 22.438 22.562 22.284
7+310.80 22.326 4.40% -4.40% 22.662 22.384 22.508 22.230
7+312.20 22.271 4.40% -4.40% 22.607 22.329 22.453 22.175
7+313.60 22.214 4.40% -4.40% 22.550 22.272 22.396 22.118
7+315.00 22.157 4.40% -4.40% 22.493 22.215 22.339 22.061
7+316.40 22.098 4.40% -4.40% 22.434 22.156 22.280 22.002
7+317.80 22.038 4.40% -4.40% 22.374 22.096 22.220 21.942
7+319.20 21.977 4.40% -4.40% 22.313 22.035 22.159 21.881
7+320.60 21.915 4.40% -4.40% 22.251 21.973 22.097 21.819
7+322.00 21.851 4.40% -4.40% 22.187 21.909 22.033 21.755
7+323.40 21.787 4.40% -4.40% 22.123 21.845 21.969 21.691
7+324.80 21.721 4.40% -4.40% 22.057 21.779 21.903 21.625
7+326.20 21.654 4.40% -4.40% 21.990 21.712 21.836 21.558
7+327.60 21.586 4.40% -4.40% 21.922 21.644 21.768 21.490
7+329.00 21.517 4.40% -4.40% 21.853 21.575 21.699 21.421
7+330.40 21.447 4.40% -4.40% 21.783 21.505 21.629 21.351
7+331.80 21.375 4.40% -4.40% 21.711 21.433 21.557 21.279
7+333.20 21.303 4.40% -4.40% 21.639 21.361 21.485 21.207
7+334.60 21.229 4.40% -4.40% 21.565 21.287 21.411 21.133
7+336.00 21.154 4.40% -4.40% 21.490 21.212 21.336 21.058
7+337.40 21.078 4.40% -4.40% 21.414 21.136 21.260 20.982
7+338.80 21.002 4.40% -4.40% 21.338 21.060 21.184 20.906
7+340.20 20.926 4.40% -4.40% 21.262 20.984 21.108 20.830
7+341.60 20.850 4.40% -4.40% 21.186 20.908 21.032 20.754
7+343.00 20.774 4.40% -4.40% 21.110 20.832 20.956 20.678
7+344.40 20.698 4.40% -4.40% 21.034 20.756 20.880 20.602
7+345.80 20.622 4.40% -4.40% 20.958 20.680 20.804 20.526
7+347.20 20.546 4.40% -4.40% 20.882 20.604 20.728 20.450
7+348.60 20.470 4.40% -4.40% 20.806 20.528 20.652 20.374

175 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+350.00 20.394 4.40% -4.40% 20.730 20.452 20.576 20.298


7+351.40 20.318 4.40% -4.40% 20.654 20.376 20.500 20.222
7+352.80 20.242 4.40% -4.40% 20.578 20.300 20.424 20.146
7+354.20 20.166 4.40% -4.40% 20.502 20.224 20.348 20.070
7+355.60 20.090 4.40% -4.40% 20.426 20.148 20.272 19.994
7+357.00 20.014 4.40% -4.40% 20.350 20.072 20.196 19.918
7+358.40 19.938 4.40% -4.40% 20.274 19.996 20.120 19.842
7+359.80 19.862 4.40% -4.40% 20.198 19.920 20.044 19.766
7+361.20 19.786 4.40% -4.40% 20.122 19.844 19.968 19.690
7+362.60 19.710 4.40% -4.40% 20.046 19.768 19.892 19.614
7+364.00 19.634 4.40% -4.40% 19.970 19.692 19.816 19.538
7+365.40 19.558 4.40% -4.40% 19.894 19.616 19.740 19.462
7+366.80 19.482 4.40% -4.40% 19.818 19.540 19.664 19.386
7+368.20 19.406 4.40% -4.40% 19.742 19.464 19.588 19.310
7+369.60 19.330 4.40% -4.40% 19.666 19.388 19.512 19.234
7+371.00 19.254 4.40% -4.40% 19.590 19.312 19.436 19.158
7+372.40 19.178 4.40% -4.40% 19.514 19.236 19.360 19.082
7+373.80 19.102 4.40% -4.40% 19.438 19.160 19.284 19.006
7+375.20 19.026 4.40% -4.40% 19.362 19.084 19.208 18.930
7+376.60 18.950 4.40% -4.40% 19.286 19.008 19.132 18.854
7+378.00 18.874 4.40% -4.40% 19.210 18.932 19.056 18.778
7+379.40 18.798 4.40% -4.40% 19.134 18.856 18.980 18.702
7+380.80 18.722 4.40% -4.40% 19.058 18.780 18.904 18.626
7+382.20 18.646 4.40% -4.40% 18.982 18.704 18.828 18.550
7+383.60 18.570 4.40% -4.40% 18.906 18.628 18.752 18.474
7+385.00 18.494 4.40% -4.40% 18.830 18.552 18.676 18.398
7+386.40 18.418 4.40% -4.40% 18.754 18.476 18.600 18.322
7+387.80 18.342 4.40% -4.40% 18.678 18.400 18.524 18.246
7+389.20 18.266 4.40% -4.40% 18.602 18.324 18.448 18.170
7+390.60 18.190 4.40% -4.40% 18.526 18.248 18.372 18.094

176 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+392.00 18.114 4.40% -4.40% 18.450 18.172 18.296 18.018


7+393.40 18.038 4.40% -4.40% 18.374 18.096 18.220 17.942
7+394.80 17.962 4.40% -4.40% 18.298 18.020 18.144 17.866
7+396.20 17.885 4.40% -4.40% 18.221 17.943 18.067 17.789
7+397.60 17.809 4.40% -4.40% 18.145 17.867 17.991 17.713
7+399.00 17.733 4.40% -4.40% 18.069 17.791 17.915 17.637
7+400.40 17.657 4.40% -4.40% 17.993 17.715 17.839 17.561
7+401.80 17.581 4.40% -4.40% 17.917 17.639 17.763 17.485
7+403.20 17.505 4.40% -4.40% 17.841 17.563 17.687 17.409
7+404.60 17.429 4.40% -4.40% 17.765 17.487 17.611 17.333
7+406.00 17.353 4.40% -4.40% 17.689 17.411 17.535 17.257
7+407.40 17.277 4.40% -4.40% 17.613 17.335 17.459 17.181
7+408.80 17.201 4.40% -4.40% 17.537 17.259 17.383 17.105
7+410.20 17.125 4.40% -4.40% 17.461 17.183 17.307 17.029
7+411.60 17.049 4.40% -4.40% 17.385 17.107 17.231 16.953
7+413.00 16.973 4.40% -4.40% 17.309 17.031 17.155 16.877
7+414.40 16.897 4.40% -4.40% 17.233 16.955 17.079 16.801
7+415.80 16.821 4.40% -4.40% 17.157 16.879 17.003 16.725
7+417.20 16.745 4.40% -4.40% 17.081 16.803 16.927 16.649
7+418.60 16.669 4.40% -4.40% 17.005 16.727 16.851 16.573
7+420.00 16.593 4.40% -4.40% 16.929 16.651 16.775 16.497
7+421.40 16.517 4.40% -4.40% 16.853 16.575 16.699 16.421
7+422.80 16.441 4.40% -4.40% 16.777 16.499 16.623 16.345
7+424.20 16.365 4.40% -4.40% 16.701 16.423 16.547 16.269
7+425.60 16.289 4.40% -4.40% 16.625 16.347 16.471 16.193
7+427.00 16.213 4.40% -4.40% 16.549 16.271 16.395 16.117
7+428.40 16.137 4.40% -4.40% 16.473 16.195 16.319 16.041
7+429.80 16.061 4.40% -4.40% 16.397 16.119 16.243 15.965
7+431.20 15.985 4.40% -4.40% 16.321 16.043 16.167 15.889
7+432.60 15.909 4.40% -4.40% 16.245 15.967 16.091 15.813

177 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+434.00 15.833 4.40% -4.40% 16.169 15.891 16.015 15.737


7+435.40 15.757 4.40% -4.40% 16.093 15.815 15.939 15.661
7+436.80 15.681 4.40% -4.40% 16.017 15.739 15.863 15.585
7+438.20 15.605 4.40% -4.40% 15.941 15.663 15.787 15.509
7+439.60 15.529 4.40% -4.40% 15.865 15.587 15.711 15.433
7+441.00 15.453 4.40% -4.40% 15.789 15.511 15.635 15.357
7+442.40 15.377 4.40% -4.40% 15.713 15.435 15.559 15.281
7+443.80 15.301 4.40% -4.40% 15.637 15.359 15.483 15.205
7+445.20 15.225 4.40% -4.40% 15.561 15.283 15.407 15.129
7+446.60 15.149 4.40% -4.40% 15.485 15.207 15.331 15.053
7+448.00 15.073 4.40% -4.40% 15.409 15.131 15.255 14.977
7+449.40 14.997 4.40% -4.40% 15.333 15.055 15.179 14.901
7+450.80 14.921 4.40% -4.40% 15.257 14.979 15.103 14.825
7+452.20 14.845 4.40% -4.40% 15.181 14.903 15.027 14.749
7+453.60 14.769 4.40% -4.40% 15.105 14.827 14.951 14.673
7+455.00 14.693 4.40% -4.40% 15.029 14.751 14.875 14.597
7+456.40 14.617 4.40% -4.40% 14.953 14.675 14.799 14.521
7+457.80 14.541 4.40% -4.40% 14.877 14.599 14.723 14.445
7+459.20 14.465 4.40% -4.40% 14.801 14.523 14.647 14.369
7+460.60 14.389 4.40% -4.40% 14.725 14.447 14.571 14.293
7+462.00 14.313 4.40% -4.40% 14.649 14.371 14.495 14.217
7+463.40 14.237 4.40% -4.40% 14.573 14.295 14.419 14.141
7+464.80 14.161 4.40% -4.40% 14.497 14.219 14.343 14.065
7+466.20 14.085 4.40% -4.40% 14.421 14.143 14.267 13.989
7+467.60 14.009 4.40% -4.40% 14.345 14.067 14.191 13.913
7+469.00 13.933 4.40% -4.40% 14.269 13.991 14.115 13.837
7+470.40 13.857 4.40% -4.40% 14.193 13.915 14.039 13.761
7+471.80 13.781 4.40% -4.40% 14.117 13.839 13.963 13.685
7+473.20 13.705 4.40% -4.40% 14.041 13.763 13.887 13.609
7+474.60 13.629 4.40% -4.40% 13.965 13.687 13.811 13.533

178 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+476.00 13.554 4.40% -4.40% 13.890 13.612 13.736 13.458


7+477.40 13.479 4.40% -4.40% 13.815 13.537 13.661 13.383
7+478.80 13.406 4.40% -4.40% 13.742 13.464 13.588 13.310
7+480.20 13.333 4.40% -4.40% 13.669 13.391 13.515 13.237
7+481.60 13.262 4.40% -4.40% 13.598 13.320 13.444 13.166
7+483.00 13.191 4.40% -4.40% 13.527 13.249 13.373 13.095
7+484.40 13.121 4.40% -4.40% 13.457 13.179 13.303 13.025
7+485.80 13.051 4.40% -4.40% 13.387 13.109 13.233 12.955
7+487.20 12.983 4.40% -4.40% 13.319 13.041 13.165 12.887
7+488.60 12.916 4.40% -4.40% 13.252 12.974 13.098 12.820
7+490.00 12.849 4.40% -4.40% 13.185 12.907 13.031 12.753
7+491.40 12.783 4.40% -4.40% 13.119 12.841 12.965 12.687
7+492.80 12.718 4.40% -4.40% 13.054 12.776 12.900 12.622
7+494.20 12.654 4.40% -4.40% 12.990 12.712 12.836 12.558
7+495.60 12.591 4.40% -4.40% 12.927 12.649 12.773 12.495
7+497.00 12.528 4.40% -4.40% 12.864 12.586 12.710 12.432
7+498.40 12.467 4.40% -4.40% 12.803 12.525 12.649 12.371
7+499.80 12.406 4.40% -4.40% 12.742 12.464 12.588 12.310
7+501.20 12.346 4.40% -4.40% 12.682 12.404 12.528 12.250
7+502.60 12.287 4.40% -4.40% 12.623 12.345 12.469 12.191
7+504.00 12.229 4.40% -4.40% 12.565 12.287 12.411 12.133
7+505.40 12.172 4.40% -4.40% 12.508 12.230 12.354 12.076
7+506.80 12.116 4.40% -4.40% 12.452 12.174 12.298 12.020
7+508.20 12.060 4.40% -4.40% 12.396 12.118 12.242 11.964
7+509.60 12.005 4.40% -4.40% 12.341 12.063 12.187 11.909
7+511.00 11.951 4.40% -4.40% 12.287 12.009 12.133 11.855
7+512.40 11.898 4.40% -4.40% 12.234 11.956 12.080 11.802
7+513.80 11.846 4.40% -4.40% 12.182 11.904 12.028 11.750
7+515.20 11.795 4.40% -4.40% 12.131 11.853 11.977 11.699
7+516.60 11.744 4.40% -4.40% 12.080 11.802 11.926 11.648

179 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+518.00 11.695 4.40% -4.40% 12.031 11.753 11.877 11.599


7+519.40 11.646 4.40% -4.40% 11.982 11.704 11.828 11.550
7+520.80 11.598 4.40% -4.40% 11.934 11.656 11.780 11.502
7+522.20 11.551 4.40% -4.40% 11.887 11.609 11.733 11.455
7+523.60 11.505 4.40% -4.40% 11.841 11.563 11.687 11.409
7+525.00 11.460 4.40% -4.40% 11.796 11.518 11.642 11.364
7+526.40 11.415 4.40% -4.40% 11.751 11.473 11.597 11.319
7+527.80 11.372 4.40% -4.40% 11.708 11.430 11.554 11.276
7+529.20 11.329 4.40% -4.40% 11.665 11.387 11.511 11.233
7+530.60 11.287 4.40% -4.40% 11.623 11.345 11.469 11.191
7+532.00 11.246 4.40% -4.40% 11.582 11.304 11.428 11.150
7+533.40 11.205 4.40% -4.40% 11.541 11.263 11.387 11.109
7+534.80 11.166 4.40% -4.40% 11.502 11.224 11.348 11.070
7+536.20 11.128 4.40% -4.40% 11.464 11.186 11.310 11.032
7+537.60 11.090 4.40% -4.40% 11.426 11.148 11.272 10.994
7+539.00 11.053 4.40% -4.40% 11.389 11.111 11.235 10.957
7+540.40 11.017 4.40% -4.40% 11.353 11.075 11.199 10.921
7+541.80 10.982 4.40% -4.40% 11.318 11.040 11.164 10.886
7+543.20 10.948 4.40% -4.40% 11.284 11.006 11.130 10.852
7+544.60 10.914 4.40% -4.40% 11.250 10.972 11.096 10.818
7+546.00 10.882 4.40% -4.40% 11.218 10.940 11.064 10.786
7+547.40 10.850 4.40% -4.40% 11.186 10.908 11.032 10.754
7+548.80 10.819 4.40% -4.40% 11.155 10.877 11.001 10.723
7+550.20 10.789 4.40% -4.40% 11.125 10.847 10.971 10.693
7+551.60 10.760 4.40% -4.40% 11.096 10.818 10.942 10.664
7+553.00 10.732 4.40% -4.40% 11.068 10.790 10.914 10.636
7+554.40 10.704 4.40% -4.40% 11.040 10.762 10.886 10.608
7+555.80 10.678 4.40% -4.40% 11.014 10.736 10.860 10.582
7+557.20 10.652 4.40% -4.40% 10.988 10.710 10.834 10.556
7+558.60 10.627 4.40% -4.40% 10.963 10.685 10.809 10.531

180 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+560.00 10.603 4.40% -4.40% 10.939 10.661 10.785 10.507


7+561.40 10.580 4.40% -4.40% 10.916 10.638 10.762 10.484
7+562.80 10.557 4.40% -4.40% 10.893 10.615 10.739 10.461
7+564.20 10.536 4.40% -4.40% 10.872 10.594 10.718 10.440
7+565.60 10.515 4.40% -4.40% 10.851 10.573 10.697 10.419
7+567.00 10.496 4.40% -4.40% 10.832 10.554 10.678 10.400
7+568.40 10.477 4.40% -4.40% 10.813 10.535 10.659 10.381
7+569.80 10.459 4.40% -4.40% 10.795 10.517 10.641 10.363
7+571.20 10.441 4.40% -4.40% 10.777 10.499 10.623 10.345
7+572.60 10.425 4.40% -4.40% 10.761 10.483 10.607 10.329
7+574.00 10.409 4.40% -4.40% 10.745 10.467 10.591 10.313
7+575.40 10.395 4.40% -4.40% 10.731 10.453 10.577 10.299
7+576.80 10.381 4.40% -4.40% 10.717 10.439 10.563 10.285
7+578.20 10.368 4.40% -4.40% 10.704 10.426 10.550 10.272
7+579.60 10.356 4.40% -4.40% 10.692 10.414 10.538 10.260
7+581.00 10.345 4.40% -4.40% 10.681 10.403 10.527 10.249
7+582.40 10.334 4.40% -4.40% 10.670 10.392 10.516 10.238
7+583.80 10.325 4.40% -4.40% 10.661 10.383 10.507 10.229
7+585.20 10.316 4.40% -4.40% 10.652 10.374 10.498 10.220
7+586.60 10.308 4.40% -4.40% 10.644 10.366 10.490 10.212
7+588.00 10.300 4.40% -4.40% 10.636 10.358 10.482 10.204
7+589.40 10.293 4.40% -4.40% 10.629 10.351 10.475 10.197
7+590.80 10.285 4.40% -4.40% 10.621 10.343 10.467 10.189
7+592.20 10.277 4.40% -4.40% 10.613 10.335 10.459 10.181
7+593.60 10.269 4.40% -4.40% 10.605 10.327 10.451 10.173
7+595.00 10.261 4.40% -4.40% 10.597 10.319 10.443 10.165
7+596.40 10.254 4.40% -4.40% 10.590 10.312 10.436 10.158
7+597.80 10.246 4.40% -4.40% 10.582 10.304 10.428 10.150
7+599.20 10.238 4.40% -4.40% 10.574 10.296 10.420 10.142
7+600.60 10.230 4.40% -4.40% 10.566 10.288 10.412 10.134

181 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+602.00 10.223 4.40% -4.40% 10.559 10.281 10.405 10.127


7+603.40 10.215 4.40% -4.40% 10.551 10.273 10.397 10.119
7+604.80 10.207 4.40% -4.40% 10.543 10.265 10.389 10.111
7+606.20 10.199 4.40% -4.40% 10.535 10.257 10.381 10.103
7+607.60 10.191 4.40% -4.40% 10.527 10.249 10.373 10.095
7+609.00 10.184 4.40% -4.40% 10.520 10.242 10.366 10.088
7+610.40 10.176 4.40% -4.40% 10.512 10.234 10.358 10.080
7+611.80 10.168 4.40% -4.40% 10.504 10.226 10.350 10.072
7+613.20 10.160 4.40% -4.40% 10.496 10.218 10.342 10.064
7+614.60 10.153 4.40% -4.40% 10.489 10.211 10.335 10.057
7+616.00 10.145 4.40% -4.40% 10.481 10.203 10.327 10.049
7+617.40 10.137 4.40% -4.40% 10.473 10.195 10.319 10.041
7+618.80 10.129 4.40% -4.40% 10.465 10.187 10.311 10.033
7+620.20 10.121 4.40% -4.40% 10.457 10.179 10.303 10.025
7+621.60 10.114 4.40% -4.40% 10.450 10.172 10.296 10.018
7+623.00 10.106 4.40% -4.40% 10.442 10.164 10.288 10.010
7+624.40 10.098 4.40% -4.40% 10.434 10.156 10.280 10.002
7+625.80 10.090 4.40% -4.40% 10.426 10.148 10.272 9.994
7+627.20 10.083 4.40% -4.40% 10.419 10.141 10.265 9.987
7+628.60 10.075 4.40% -4.40% 10.411 10.133 10.257 9.979
7+630.00 10.067 4.40% -4.40% 10.403 10.125 10.249 9.971
7+631.40 10.059 4.40% -4.40% 10.395 10.117 10.241 9.963
7+632.80 10.051 4.40% -4.40% 10.387 10.109 10.233 9.955
7+634.20 10.044 4.40% -4.40% 10.380 10.102 10.226 9.948
7+635.60 10.036 4.40% -4.40% 10.372 10.094 10.218 9.940
7+637.00 10.028 4.40% -4.40% 10.364 10.086 10.210 9.932
7+638.40 10.020 4.40% -4.40% 10.356 10.078 10.202 9.924
7+639.80 10.013 4.40% -4.40% 10.349 10.071 10.195 9.917
7+641.20 10.005 4.40% -4.40% 10.341 10.063 10.187 9.909
7+642.60 9.997 4.40% -4.40% 10.333 10.055 10.179 9.901

182 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+644.00 9.989 4.40% -4.40% 10.325 10.047 10.171 9.893


7+645.40 9.981 4.40% -4.40% 10.317 10.039 10.163 9.885
7+646.80 9.974 4.40% -4.40% 10.310 10.032 10.156 9.878
7+648.20 9.966 4.40% -4.40% 10.302 10.024 10.148 9.870
7+649.60 9.958 4.40% -4.40% 10.294 10.016 10.140 9.862
7+651.00 9.950 4.40% -4.40% 10.286 10.008 10.132 9.854
7+652.40 9.943 4.40% -4.40% 10.279 10.001 10.125 9.847
7+653.80 9.935 4.40% -4.40% 10.271 9.993 10.117 9.839
7+655.20 9.927 4.40% -4.40% 10.263 9.985 10.109 9.831
7+656.60 9.919 4.40% -4.40% 10.255 9.977 10.101 9.823
7+658.00 9.911 4.40% -4.40% 10.247 9.969 10.093 9.815
7+659.40 9.904 4.40% -4.40% 10.240 9.962 10.086 9.808
7+660.80 9.896 4.40% -4.40% 10.232 9.954 10.078 9.800
7+662.20 9.888 4.40% -4.40% 10.224 9.946 10.070 9.792
7+663.60 9.880 4.40% -4.40% 10.216 9.938 10.062 9.784
7+665.00 9.873 4.40% -4.40% 10.209 9.931 10.055 9.777
7+666.40 9.865 4.40% -4.40% 10.201 9.923 10.047 9.769
7+667.80 9.857 4.40% -4.40% 10.193 9.915 10.039 9.761
7+669.20 9.849 4.40% -4.40% 10.185 9.907 10.031 9.753
7+670.60 9.841 4.40% -4.40% 10.177 9.899 10.023 9.745
7+672.00 9.834 4.40% -4.40% 10.170 9.892 10.016 9.738
7+673.40 9.826 4.40% -4.40% 10.162 9.884 10.008 9.730
7+674.80 9.818 4.40% -4.40% 10.154 9.876 10.000 9.722
7+676.20 9.810 4.40% -4.40% 10.146 9.868 9.992 9.714
7+677.60 9.803 4.40% -4.40% 10.139 9.861 9.985 9.707
7+679.00 9.795 4.40% -4.40% 10.131 9.853 9.977 9.699
7+680.40 9.787 4.40% -4.40% 10.123 9.845 9.969 9.691
7+681.80 9.779 4.40% -4.40% 10.115 9.837 9.961 9.683
7+683.20 9.771 4.40% -4.40% 10.107 9.829 9.953 9.675
7+684.60 9.764 4.40% -4.40% 10.100 9.822 9.946 9.668

183 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+686.00 9.756 4.40% -4.40% 10.092 9.814 9.938 9.660


7+687.40 9.748 4.40% -4.40% 10.084 9.806 9.930 9.652
7+688.80 9.740 4.40% -4.40% 10.076 9.798 9.922 9.644
7+690.20 9.733 4.40% -4.40% 10.069 9.791 9.915 9.637
7+691.60 9.725 4.40% -4.40% 10.061 9.783 9.907 9.629
7+693.00 9.717 4.40% -4.40% 10.053 9.775 9.899 9.621
7+694.40 9.709 4.40% -4.40% 10.045 9.767 9.891 9.613
7+695.80 9.701 4.40% -4.40% 10.037 9.759 9.883 9.605
7+697.20 9.694 4.40% -4.40% 10.030 9.752 9.876 9.598
7+698.60 9.686 4.35% -4.35% 10.019 9.745 9.867 9.593
7+700.00 9.678 4.19% -4.19% 10.003 9.739 9.857 9.593
7+701.40 9.670 4.04% -4.04% 9.988 9.734 9.846 9.592
7+702.80 9.663 3.88% -3.88% 9.973 9.729 9.837 9.593
7+704.20 9.655 3.72% -3.72% 9.957 9.723 9.827 9.593
7+705.60 9.647 3.56% -3.56% 9.942 9.717 9.817 9.592
7+707.00 9.639 3.40% -3.40% 9.926 9.711 9.807 9.592
7+708.40 9.631 3.25% -3.25% 9.910 9.706 9.796 9.592
7+709.80 9.624 3.09% -3.09% 9.895 9.701 9.787 9.593
7+711.20 9.616 2.93% -3.00% 9.880 9.695 9.778 9.589
7+712.60 9.608 2.77% -3.00% 9.864 9.689 9.770 9.581
7+714.00 9.600 2.61% -3.00% 9.848 9.683 9.762 9.573
7+715.40 9.593 2.46% -3.00% 9.833 9.679 9.755 9.566
7+716.80 9.585 2.30% -3.00% 9.818 9.673 9.747 9.558
7+718.20 9.577 2.14% -3.00% 9.802 9.667 9.739 9.550
7+719.60 9.569 1.98% -3.00% 9.786 9.661 9.731 9.542
7+721.00 9.561 1.82% -3.00% 9.770 9.655 9.723 9.534
7+722.40 9.554 1.67% -3.00% 9.756 9.651 9.716 9.527
7+723.80 9.546 1.51% -3.00% 9.740 9.645 9.708 9.519
7+725.20 9.538 1.35% -3.00% 9.724 9.639 9.700 9.511
7+726.60 9.530 1.19% -3.00% 9.708 9.633 9.692 9.503

184 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+728.00 9.523 1.03% -3.00% 9.694 9.629 9.685 9.496


7+729.40 9.515 0.88% -3.00% 9.678 9.623 9.677 9.488
7+730.80 9.507 0.72% -3.00% 9.662 9.617 9.669 9.480
7+732.20 9.499 0.56% -3.00% 9.646 9.611 9.661 9.472
7+733.60 9.491 0.40% -3.00% 9.631 9.605 9.653 9.464
7+735.00 9.484 0.24% -3.00% 9.616 9.601 9.646 9.457
7+736.40 9.476 0.09% -3.00% 9.600 9.595 9.638 9.449
7+737.80 9.468 -0.07% -3.00% 9.585 9.589 9.630 9.441
7+739.20 9.460 -0.23% -3.00% 9.569 9.583 9.622 9.433
7+740.60 9.453 -0.39% -3.00% 9.554 9.578 9.615 9.426
7+742.00 9.445 -0.54% -3.00% 9.538 9.573 9.607 9.418
7+743.40 9.437 -0.70% -3.00% 9.523 9.567 9.599 9.410
7+744.80 9.429 -0.86% -3.00% 9.507 9.561 9.591 9.402
7+746.20 9.421 -1.02% -3.00% 9.491 9.555 9.583 9.394
7+747.60 9.414 -1.18% -3.00% 9.476 9.550 9.576 9.387
7+749.00 9.406 -1.33% -3.00% 9.461 9.545 9.568 9.379
7+750.40 9.398 -1.49% -3.00% 9.445 9.539 9.560 9.371
7+751.80 9.390 -1.65% -3.00% 9.429 9.533 9.552 9.363
7+753.20 9.383 -1.81% -3.00% 9.414 9.528 9.545 9.356
7+754.60 9.375 -1.97% -3.00% 9.399 9.523 9.537 9.348
7+756.00 9.369 -2.12% -3.00% 9.385 9.519 9.531 9.342
7+757.40 9.364 -2.28% -3.00% 9.372 9.516 9.526 9.337
7+758.80 9.359 -2.44% -3.00% 9.359 9.513 9.521 9.332
7+760.20 9.355 -2.60% -3.00% 9.348 9.511 9.517 9.328
7+761.60 9.352 -2.76% -3.00% 9.337 9.511 9.514 9.325
7+763.00 9.350 -2.91% -3.00% 9.327 9.511 9.512 9.323
7+764.40 9.348 -3.00% -3.00% 9.321 9.510 9.510 9.321
7+765.80 9.348 -3.00% -3.00% 9.321 9.510 9.510 9.321
7+767.20 9.348 -3.00% -3.00% 9.321 9.510 9.510 9.321
7+768.60 9.349 -3.00% -3.00% 9.322 9.511 9.511 9.322

185 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+770.00 9.351 -3.00% -3.00% 9.324 9.513 9.513 9.324


7+771.40 9.354 -3.00% -3.00% 9.327 9.516 9.516 9.327
7+772.80 9.358 -3.00% -3.00% 9.331 9.520 9.520 9.331
7+774.20 9.362 -3.00% -3.00% 9.335 9.524 9.524 9.335
7+775.60 9.368 -3.00% -3.00% 9.341 9.530 9.530 9.341
7+777.00 9.374 -3.00% -3.00% 9.347 9.536 9.536 9.347
7+778.40 9.381 -3.00% -3.00% 9.354 9.543 9.543 9.354
7+779.80 9.389 -3.00% -3.00% 9.362 9.551 9.551 9.362
7+781.20 9.397 -3.00% -3.00% 9.370 9.559 9.559 9.370
7+782.60 9.407 -3.00% -3.00% 9.380 9.569 9.569 9.380
7+784.00 9.417 -3.00% -3.00% 9.390 9.579 9.579 9.390
7+785.40 9.428 -3.00% -3.00% 9.401 9.590 9.590 9.401
7+786.80 9.440 -3.00% -3.00% 9.413 9.602 9.602 9.413
7+788.20 9.453 -3.00% -3.00% 9.426 9.615 9.615 9.426
7+789.60 9.467 -3.00% -3.00% 9.440 9.629 9.629 9.440
7+791.00 9.481 -3.00% -3.00% 9.454 9.643 9.643 9.454
7+792.40 9.496 -3.00% -3.00% 9.469 9.658 9.658 9.469
7+793.80 9.513 -3.00% -3.00% 9.486 9.675 9.675 9.486
7+795.20 9.530 -3.00% -3.00% 9.503 9.692 9.692 9.503
7+796.60 9.547 -3.00% -3.00% 9.520 9.709 9.709 9.520
7+798.00 9.566 -3.00% -3.00% 9.539 9.728 9.728 9.539
7+799.40 9.586 -3.00% -3.00% 9.559 9.748 9.748 9.559
7+800.80 9.606 -3.00% -3.00% 9.579 9.768 9.768 9.579
7+802.20 9.627 -3.00% -3.00% 9.600 9.789 9.789 9.600
7+803.60 9.649 -3.00% -3.00% 9.622 9.811 9.811 9.622
7+805.00 9.672 -3.00% -3.00% 9.645 9.834 9.834 9.645
7+806.40 9.696 -3.00% -3.00% 9.669 9.858 9.858 9.669
7+807.80 9.720 -3.00% -3.00% 9.693 9.882 9.882 9.693
7+809.20 9.745 -3.00% -3.00% 9.718 9.907 9.907 9.718
7+810.60 9.772 -3.00% -3.00% 9.745 9.934 9.934 9.745

186 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+812.00 9.799 -3.00% -3.00% 9.772 9.961 9.961 9.772


7+813.40 9.826 -3.00% -3.00% 9.799 9.988 9.988 9.799
7+814.80 9.855 -3.00% -3.00% 9.828 10.017 10.017 9.828
7+816.20 9.884 -3.00% -3.00% 9.857 10.046 10.046 9.857
7+817.60 9.915 -3.00% -3.00% 9.888 10.077 10.077 9.888
7+819.00 9.946 -3.00% -3.00% 9.919 10.108 10.108 9.919
7+820.40 9.978 -3.00% -3.00% 9.951 10.140 10.140 9.951
7+821.80 10.011 -3.00% -3.00% 9.984 10.173 10.173 9.984
7+823.20 10.044 -3.00% -3.00% 10.017 10.206 10.206 10.017
7+824.60 10.079 -3.00% -3.00% 10.052 10.241 10.241 10.052
7+826.00 10.114 -3.00% -3.00% 10.087 10.276 10.276 10.087
7+827.40 10.150 -3.00% -3.00% 10.123 10.312 10.312 10.123
7+828.80 10.187 -3.00% -3.00% 10.160 10.349 10.349 10.160
7+830.20 10.225 -3.00% -3.00% 10.198 10.387 10.387 10.198
7+831.60 10.264 -3.00% -3.00% 10.237 10.426 10.426 10.237
7+833.00 10.303 -3.00% -3.00% 10.276 10.465 10.465 10.276
7+834.40 10.344 -3.00% -3.00% 10.317 10.506 10.506 10.317
7+835.80 10.385 -3.00% -3.00% 10.358 10.547 10.547 10.358
7+837.20 10.427 -3.00% -3.00% 10.400 10.589 10.589 10.400
7+838.60 10.470 -3.00% -3.00% 10.443 10.632 10.632 10.443
7+840.00 10.513 -3.00% -3.00% 10.486 10.675 10.675 10.486
7+841.40 10.558 -3.00% -3.00% 10.531 10.720 10.720 10.531
7+842.80 10.603 -3.00% -3.00% 10.576 10.765 10.765 10.576
7+844.20 10.649 -3.00% -3.00% 10.622 10.811 10.811 10.622
7+845.60 10.696 -3.00% -3.00% 10.669 10.858 10.858 10.669
7+847.00 10.744 -3.00% -3.00% 10.717 10.906 10.906 10.717
7+848.40 10.793 -3.00% -3.00% 10.766 10.955 10.955 10.766
7+849.80 10.842 -3.00% -3.00% 10.815 11.004 11.004 10.815
7+851.20 10.893 -3.00% -3.00% 10.866 11.055 11.055 10.866
7+852.60 10.944 -3.00% -3.00% 10.917 11.106 11.106 10.917

187 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+854.00 10.996 -3.00% -3.00% 10.969 11.158 11.158 10.969


7+855.40 11.049 -3.00% -3.00% 11.022 11.211 11.211 11.022
7+856.80 11.103 -3.00% -3.00% 11.076 11.265 11.265 11.076
7+858.20 11.157 -3.00% -3.00% 11.130 11.319 11.319 11.130
7+859.60 11.212 -3.00% -3.00% 11.185 11.374 11.374 11.185
7+861.00 11.269 -3.00% -3.00% 11.242 11.431 11.431 11.242
7+862.40 11.326 -3.00% -3.00% 11.299 11.488 11.488 11.299
7+863.80 11.383 -3.00% -3.00% 11.356 11.545 11.545 11.356
7+865.20 11.442 -3.00% -3.00% 11.415 11.604 11.604 11.415
7+866.60 11.502 -3.00% -3.00% 11.475 11.664 11.664 11.475
7+868.00 11.562 -3.00% -3.00% 11.535 11.724 11.724 11.535
7+869.40 11.623 -3.00% -3.00% 11.596 11.785 11.785 11.596
7+870.80 11.685 -3.00% -3.00% 11.658 11.847 11.847 11.658
7+872.20 11.748 -3.00% -3.00% 11.721 11.910 11.910 11.721
7+873.60 11.812 -3.00% -3.00% 11.785 11.974 11.974 11.785
7+875.00 11.876 -3.00% -3.00% 11.849 12.038 12.038 11.849
7+876.40 11.941 -3.00% -3.00% 11.914 12.103 12.103 11.914
7+877.80 12.008 -3.00% -3.00% 11.981 12.170 12.170 11.981
7+879.20 12.075 -3.00% -3.00% 12.048 12.237 12.237 12.048
7+880.60 12.143 -3.00% -3.00% 12.116 12.305 12.305 12.116
7+882.00 12.211 -3.00% -3.00% 12.184 12.373 12.373 12.184
7+883.40 12.281 -3.00% -3.00% 12.254 12.443 12.443 12.254
7+884.80 12.351 -3.00% -3.00% 12.324 12.513 12.513 12.324
7+886.20 12.422 -3.00% -3.00% 12.395 12.584 12.584 12.395
7+887.60 12.494 -3.00% -3.00% 12.467 12.656 12.656 12.467
7+889.00 12.565 -3.00% -3.00% 12.538 12.727 12.727 12.538
7+890.40 12.637 -3.00% -3.00% 12.610 12.799 12.799 12.610
7+891.80 12.708 -3.00% -3.00% 12.681 12.870 12.870 12.681
7+893.20 12.780 -3.00% -3.00% 12.753 12.942 12.942 12.753
7+894.60 12.852 -3.00% -3.00% 12.825 13.014 13.014 12.825

188 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+896.00 12.923 -3.00% -3.00% 12.896 13.085 13.085 12.896


7+897.40 12.995 -3.00% -3.00% 12.968 13.157 13.157 12.968
7+898.80 13.066 -3.00% -3.00% 13.039 13.228 13.228 13.039
7+900.20 13.138 -3.00% -3.00% 13.111 13.300 13.300 13.111
7+901.60 13.209 -3.00% -3.00% 13.182 13.371 13.371 13.182
7+903.00 13.281 -3.00% -3.00% 13.254 13.443 13.443 13.254
7+904.40 13.353 -3.00% -3.00% 13.326 13.515 13.515 13.326
7+905.80 13.424 -3.00% -3.00% 13.397 13.586 13.586 13.397
7+907.20 13.496 -3.00% -3.00% 13.469 13.658 13.658 13.469
7+908.60 13.567 -3.00% -3.00% 13.540 13.729 13.729 13.540
7+910.00 13.639 -3.00% -3.00% 13.612 13.801 13.801 13.612
7+911.40 13.710 -3.00% -3.00% 13.683 13.872 13.872 13.683
7+912.80 13.782 -3.00% -3.00% 13.755 13.944 13.944 13.755
7+914.20 13.853 -3.00% -3.00% 13.826 14.015 14.015 13.826
7+915.60 13.925 -3.00% -3.00% 13.898 14.087 14.087 13.898
7+917.00 13.997 -3.00% -3.00% 13.970 14.159 14.159 13.970
7+918.40 14.068 -3.00% -3.00% 14.041 14.230 14.230 14.041
7+919.80 14.140 -3.00% -2.93% 14.113 14.302 14.301 14.116
7+921.20 14.211 -3.00% -2.73% 14.184 14.373 14.369 14.197
7+922.60 14.283 -3.00% -2.53% 14.256 14.445 14.438 14.279
7+924.00 14.354 -3.00% -2.32% 14.327 14.516 14.507 14.360
7+925.40 14.426 -3.00% -2.12% 14.399 14.588 14.576 14.442
7+926.80 14.498 -3.00% -1.92% 14.471 14.660 14.645 14.524
7+928.20 14.569 -3.00% -1.71% 14.542 14.731 14.713 14.605
7+929.60 14.641 -3.00% -1.51% 14.614 14.803 14.782 14.687
7+931.00 14.712 -3.00% -1.31% 14.685 14.874 14.850 14.768
7+932.40 14.782 -3.00% -1.10% 14.755 14.944 14.917 14.848
7+933.80 14.851 -3.00% -0.90% 14.824 15.013 14.984 14.927
7+935.20 14.919 -3.00% -0.70% 14.892 15.081 15.049 15.005
7+936.60 14.986 -3.00% -0.49% 14.959 15.148 15.113 15.082

189 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+938.00 15.052 -3.00% -0.29% 15.025 15.214 15.176 15.158


7+939.40 15.117 -3.00% -0.09% 15.090 15.279 15.238 15.233
7+940.80 15.181 -3.00% 0.12% 15.154 15.343 15.299 15.307
7+942.20 15.244 -3.00% 0.32% 15.217 15.406 15.360 15.380
7+943.60 15.305 -3.00% 0.52% 15.278 15.467 15.418 15.451
7+945.00 15.366 -3.00% 0.73% 15.339 15.528 15.476 15.522
7+946.40 15.425 -3.00% 0.93% 15.398 15.587 15.532 15.591
7+947.80 15.484 -3.00% 1.13% 15.457 15.646 15.588 15.660
7+949.20 15.541 -3.00% 1.34% 15.514 15.703 15.642 15.727
7+950.60 15.597 -3.00% 1.54% 15.570 15.759 15.695 15.793
7+952.00 15.652 -3.00% 1.74% 15.625 15.814 15.748 15.857
7+953.40 15.706 -3.00% 1.95% 15.679 15.868 15.799 15.921
7+954.80 15.759 -3.00% 2.15% 15.732 15.921 15.849 15.984
7+956.20 15.811 -3.00% 2.35% 15.784 15.973 15.898 16.046
7+957.60 15.862 -3.00% 2.56% 15.835 16.024 15.946 16.107
7+959.00 15.912 -3.00% 2.76% 15.885 16.074 15.993 16.167
7+960.40 15.960 -3.04% 2.96% 15.931 16.123 16.038 16.225
7+961.80 16.008 -3.24% 3.17% 15.969 16.173 16.084 16.283
7+963.20 16.054 -3.44% 3.37% 16.006 16.222 16.127 16.339
7+964.60 16.100 -3.63% 3.58% 16.042 16.271 16.170 16.395
7+966.00 16.144 -3.83% 3.78% 16.076 16.318 16.211 16.449
7+967.40 16.187 -4.03% 3.98% 16.109 16.363 16.251 16.502
7+968.80 16.230 -4.23% 4.19% 16.143 16.409 16.291 16.555
7+970.20 16.271 -4.43% 4.39% 16.174 16.453 16.330 16.606
7+971.60 16.311 -4.63% 4.59% 16.204 16.496 16.367 16.656
7+973.00 16.350 -4.83% 4.80% 16.233 16.538 16.403 16.705
7+974.40 16.388 -5.03% 5.00% 16.262 16.578 16.438 16.753
7+975.80 16.424 -5.23% 5.20% 16.288 16.617 16.471 16.799
7+977.20 16.460 -5.43% 5.41% 16.314 16.656 16.504 16.845
7+978.60 16.495 -5.63% 5.61% 16.339 16.694 16.536 16.890

190 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

7+980.00 16.528 -5.83% 5.81% 16.363 16.730 16.567 16.933


7+981.40 16.561 -6.02% 6.02% 16.386 16.765 16.597 16.976
7+982.80 16.592 -6.22% 6.22% 16.407 16.799 16.625 17.017
7+984.20 16.622 -6.40% 6.40% 16.428 16.832 16.652 17.056
7+985.60 16.652 -6.40% 6.40% 16.458 16.862 16.682 17.086
7+987.00 16.680 -6.40% 6.40% 16.486 16.890 16.710 17.114
7+988.40 16.707 -6.40% 6.40% 16.513 16.917 16.737 17.141
7+989.80 16.733 -6.40% 6.40% 16.539 16.943 16.763 17.167
7+991.20 16.758 -6.40% 6.40% 16.564 16.968 16.788 17.192
7+992.60 16.782 -6.40% 6.40% 16.588 16.992 16.812 17.216
7+994.00 16.804 -6.40% 6.40% 16.610 17.014 16.834 17.238
7+995.40 16.826 -6.40% 6.40% 16.632 17.036 16.856 17.260
7+996.80 16.847 -6.40% 6.40% 16.653 17.057 16.877 17.281
7+998.20 16.866 -6.40% 6.40% 16.672 17.076 16.896 17.300
7+999.60 16.884 -6.40% 6.40% 16.690 17.094 16.914 17.318
8+001.00 16.902 -6.40% 6.40% 16.708 17.112 16.932 17.336
8+002.40 16.918 -6.40% 6.40% 16.724 17.128 16.948 17.352
8+003.80 16.933 -6.40% 6.40% 16.739 17.143 16.963 17.367
8+005.20 16.947 -6.40% 6.40% 16.753 17.157 16.977 17.381
8+006.60 16.960 -6.40% 6.40% 16.766 17.170 16.990 17.394
8+008.00 16.972 -6.40% 6.40% 16.778 17.182 17.002 17.406
8+009.40 16.983 -6.40% 6.40% 16.789 17.193 17.013 17.417
8+010.80 16.993 -6.40% 6.40% 16.799 17.203 17.023 17.427
8+012.20 17.002 -6.40% 6.40% 16.808 17.212 17.032 17.436
8+013.60 17.009 -6.40% 6.40% 16.815 17.219 17.039 17.443
8+015.00 17.016 -6.40% 6.40% 16.822 17.226 17.046 17.450
8+016.40 17.021 -6.40% 6.40% 16.827 17.231 17.051 17.455
8+017.80 17.026 -6.40% 6.40% 16.832 17.236 17.056 17.460
8+019.20 17.029 -6.40% 6.40% 16.835 17.239 17.059 17.463
8+020.60 17.031 -6.40% 6.40% 16.837 17.241 17.061 17.465

191 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+022.00 17.033 -6.40% 6.40% 16.839 17.243 17.063 17.467


8+023.40 17.033 -6.40% 6.40% 16.839 17.243 17.063 17.467
8+024.80 17.032 -6.40% 6.40% 16.838 17.242 17.062 17.466
8+026.20 17.030 -6.40% 6.40% 16.836 17.240 17.060 17.464
8+027.60 17.026 -6.40% 6.40% 16.832 17.236 17.056 17.460
8+029.00 17.022 -6.40% 6.40% 16.828 17.232 17.052 17.456
8+030.40 17.017 -6.40% 6.40% 16.823 17.227 17.047 17.451
8+031.80 17.010 -6.40% 6.40% 16.816 17.220 17.040 17.444
8+033.20 17.003 -6.40% 6.40% 16.809 17.213 17.033 17.437
8+034.60 16.994 -6.40% 6.40% 16.800 17.204 17.024 17.428
8+036.00 16.985 -6.40% 6.40% 16.791 17.195 17.015 17.419
8+037.40 16.974 -6.40% 6.40% 16.780 17.184 17.004 17.408
8+038.80 16.962 -6.40% 6.40% 16.768 17.172 16.992 17.396
8+040.20 16.949 -6.40% 6.40% 16.755 17.159 16.979 17.383
8+041.60 16.935 -6.40% 6.40% 16.741 17.145 16.965 17.369
8+043.00 16.920 -6.40% 6.40% 16.726 17.130 16.950 17.354
8+044.40 16.904 -6.40% 6.40% 16.710 17.114 16.934 17.338
8+045.80 16.887 -6.40% 6.40% 16.693 17.097 16.917 17.321
8+047.20 16.869 -6.40% 6.40% 16.675 17.079 16.899 17.303
8+048.60 16.849 -6.40% 6.40% 16.655 17.059 16.879 17.283
8+050.00 16.829 -6.40% 6.40% 16.635 17.039 16.859 17.263
8+051.40 16.808 -6.40% 6.40% 16.614 17.018 16.838 17.242
8+052.80 16.785 -6.40% 6.40% 16.591 16.995 16.815 17.219
8+054.20 16.761 -6.40% 6.40% 16.567 16.971 16.791 17.195
8+055.60 16.737 -6.40% 6.40% 16.543 16.947 16.767 17.171
8+057.00 16.711 -6.40% 6.40% 16.517 16.921 16.741 17.145
8+058.40 16.684 -6.40% 6.40% 16.490 16.894 16.714 17.118
8+059.80 16.656 -6.40% 6.40% 16.462 16.866 16.686 17.090
8+061.20 16.627 -6.40% 6.40% 16.433 16.837 16.657 17.061
8+062.60 16.597 -6.40% 6.40% 16.403 16.807 16.627 17.031

192 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+064.00 16.565 -6.40% 6.40% 16.371 16.775 16.595 16.999


8+065.40 16.533 -6.40% 6.40% 16.339 16.743 16.563 16.967
8+066.80 16.500 -6.40% 6.40% 16.306 16.710 16.530 16.934
8+068.20 16.465 -6.40% 6.40% 16.271 16.675 16.495 16.899
8+069.60 16.430 -6.40% 6.40% 16.236 16.640 16.460 16.864
8+071.00 16.393 -6.40% 6.40% 16.199 16.603 16.423 16.827
8+072.40 16.355 -6.40% 6.40% 16.161 16.565 16.385 16.789
8+073.80 16.317 -6.40% 6.40% 16.123 16.527 16.347 16.751
8+075.20 16.277 -6.40% 6.40% 16.083 16.487 16.307 16.711
8+076.60 16.236 -6.40% 6.40% 16.042 16.446 16.266 16.670
8+078.00 16.194 -6.40% 6.40% 16.000 16.404 16.224 16.628
8+079.40 16.151 -6.40% 6.40% 15.957 16.361 16.181 16.585
8+080.80 16.106 -6.40% 6.40% 15.912 16.316 16.136 16.540
8+082.20 16.061 -6.40% 6.40% 15.867 16.271 16.091 16.495
8+083.60 16.015 -6.40% 6.40% 15.821 16.225 16.045 16.449
8+085.00 15.967 -6.40% 6.40% 15.773 16.177 15.997 16.401
8+086.40 15.919 -6.40% 6.40% 15.725 16.129 15.949 16.353
8+087.80 15.869 -6.40% 6.40% 15.675 16.079 15.899 16.303
8+089.20 15.819 -6.40% 6.40% 15.625 16.029 15.849 16.253
8+090.60 15.767 -6.40% 6.40% 15.573 15.977 15.797 16.201
8+092.00 15.714 -6.40% 6.40% 15.520 15.924 15.744 16.148
8+093.40 15.660 -6.40% 6.40% 15.466 15.870 15.690 16.094
8+094.80 15.605 -6.40% 6.40% 15.411 15.815 15.635 16.039
8+096.20 15.549 -6.40% 6.40% 15.355 15.759 15.579 15.983
8+097.60 15.492 -6.40% 6.40% 15.298 15.702 15.522 15.926
8+099.00 15.434 -6.40% 6.40% 15.240 15.644 15.464 15.868
8+100.40 15.375 -6.40% 6.40% 15.181 15.585 15.405 15.809
8+101.80 15.314 -6.40% 6.40% 15.120 15.524 15.344 15.748
8+103.20 15.253 -6.40% 6.40% 15.059 15.463 15.283 15.687
8+104.60 15.190 -6.40% 6.40% 14.996 15.400 15.220 15.624

193 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+106.00 15.127 -6.40% 6.40% 14.933 15.337 15.157 15.561


8+107.40 15.062 -6.40% 6.40% 14.868 15.272 15.092 15.496
8+108.80 14.996 -6.40% 6.40% 14.802 15.206 15.026 15.430
8+110.20 14.930 -6.40% 6.40% 14.736 15.140 14.960 15.364
8+111.60 14.863 -6.40% 6.40% 14.669 15.073 14.893 15.297
8+113.00 14.797 -6.40% 6.40% 14.603 15.007 14.827 15.231
8+114.40 14.730 -6.40% 6.40% 14.536 14.940 14.760 15.164
8+115.80 14.664 -6.40% 6.40% 14.470 14.874 14.694 15.098
8+117.20 14.597 -6.40% 6.40% 14.403 14.807 14.627 15.031
8+118.60 14.531 -6.40% 6.40% 14.337 14.741 14.561 14.965
8+120.00 14.464 -6.40% 6.40% 14.270 14.674 14.494 14.898
8+121.40 14.398 -6.40% 6.40% 14.204 14.608 14.428 14.832
8+122.80 14.331 -6.40% 6.40% 14.137 14.541 14.361 14.765
8+124.20 14.265 -6.40% 6.40% 14.071 14.475 14.295 14.699
8+125.60 14.198 -6.40% 6.40% 14.004 14.408 14.228 14.632
8+127.00 14.132 -6.40% 6.40% 13.938 14.342 14.162 14.566
8+128.40 14.065 -6.40% 6.40% 13.871 14.275 14.095 14.499
8+129.80 13.999 -6.40% 6.40% 13.805 14.209 14.029 14.433
8+131.20 13.932 -6.40% 6.40% 13.738 14.142 13.962 14.366
8+132.60 13.866 -6.40% 6.40% 13.672 14.076 13.896 14.300
8+134.00 13.801 -6.40% 6.40% 13.607 14.011 13.831 14.235
8+135.40 13.736 -6.40% 6.40% 13.542 13.946 13.766 14.170
8+136.80 13.672 -6.40% 6.40% 13.478 13.882 13.702 14.106
8+138.20 13.608 -6.40% 6.40% 13.414 13.818 13.638 14.042
8+139.60 13.545 -6.40% 6.40% 13.351 13.755 13.575 13.979
8+141.00 13.483 -6.40% 6.40% 13.289 13.693 13.513 13.917
8+142.40 13.421 -6.40% 6.40% 13.227 13.631 13.451 13.855
8+143.80 13.360 -6.40% 6.40% 13.166 13.570 13.390 13.794
8+145.20 13.300 -6.40% 6.40% 13.106 13.510 13.330 13.734
8+146.60 13.240 -6.40% 6.40% 13.046 13.450 13.270 13.674

194 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+148.00 13.181 -6.40% 6.40% 12.987 13.391 13.211 13.615


8+149.40 13.123 -6.40% 6.40% 12.929 13.333 13.153 13.557
8+150.80 13.065 -6.40% 6.40% 12.871 13.275 13.095 13.499
8+152.20 13.008 -6.40% 6.40% 12.814 13.218 13.038 13.442
8+153.60 12.952 -6.40% 6.40% 12.758 13.162 12.982 13.386
8+155.00 12.896 -6.40% 6.40% 12.702 13.106 12.926 13.330
8+156.40 12.841 -6.40% 6.40% 12.647 13.051 12.871 13.275
8+157.80 12.787 -6.40% 6.40% 12.593 12.997 12.817 13.221
8+159.20 12.733 -6.40% 6.40% 12.539 12.943 12.763 13.167
8+160.60 12.680 -6.40% 6.40% 12.486 12.890 12.710 13.114
8+162.00 12.627 -6.40% 6.40% 12.433 12.837 12.657 13.061
8+163.40 12.575 -6.40% 6.40% 12.381 12.785 12.605 13.009
8+164.80 12.524 -6.40% 6.40% 12.330 12.734 12.554 12.958
8+166.20 12.474 -6.40% 6.40% 12.280 12.684 12.504 12.908
8+167.60 12.424 -6.40% 6.40% 12.230 12.634 12.454 12.858
8+169.00 12.375 -6.40% 6.40% 12.181 12.585 12.405 12.809
8+170.40 12.326 -6.40% 6.40% 12.132 12.536 12.356 12.760
8+171.80 12.278 -6.40% 6.40% 12.084 12.488 12.308 12.712
8+173.20 12.231 -6.40% 6.40% 12.037 12.441 12.261 12.665
8+174.60 12.184 -6.40% 6.40% 11.990 12.394 12.214 12.618
8+176.00 12.139 -6.40% 6.40% 11.945 12.349 12.169 12.573
8+177.40 12.093 -6.40% 6.40% 11.899 12.303 12.123 12.527
8+178.80 12.049 -6.40% 6.40% 11.855 12.259 12.079 12.483
8+180.20 12.005 -6.40% 6.40% 11.811 12.215 12.035 12.439
8+181.60 11.961 -6.40% 6.40% 11.767 12.171 11.991 12.395
8+183.00 11.919 -6.40% 6.40% 11.725 12.129 11.949 12.353
8+184.40 11.877 -6.40% 6.40% 11.683 12.087 11.907 12.311
8+185.80 11.835 -6.40% 6.40% 11.641 12.045 11.865 12.269
8+187.20 11.795 -6.40% 6.40% 11.601 12.005 11.825 12.229
8+188.60 11.755 -6.40% 6.40% 11.561 11.965 11.785 12.189

195 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+190.00 11.715 -6.40% 6.40% 11.521 11.925 11.745 12.149


8+191.40 11.676 -6.40% 6.40% 11.482 11.886 11.706 12.110
8+192.80 11.638 -6.40% 6.40% 11.444 11.848 11.668 12.072
8+194.20 11.601 -6.40% 6.40% 11.407 11.811 11.631 12.035
8+195.60 11.564 -6.40% 6.40% 11.370 11.774 11.594 11.998
8+197.00 11.528 -6.40% 6.40% 11.334 11.738 11.558 11.962
8+198.40 11.493 -6.40% 6.40% 11.299 11.703 11.523 11.927
8+199.80 11.458 -6.40% 6.40% 11.264 11.668 11.488 11.892
8+201.20 11.424 -6.40% 6.40% 11.230 11.634 11.454 11.858
8+202.60 11.390 -6.40% 6.40% 11.196 11.600 11.420 11.824
8+204.00 11.357 -6.40% 6.40% 11.163 11.567 11.387 11.791
8+205.40 11.325 -6.40% 6.40% 11.131 11.535 11.355 11.759
8+206.80 11.293 -6.40% 6.40% 11.099 11.503 11.323 11.727
8+208.20 11.262 -6.40% 6.40% 11.068 11.472 11.292 11.696
8+209.60 11.232 -6.40% 6.40% 11.038 11.442 11.262 11.666
8+211.00 11.203 -6.40% 6.40% 11.009 11.413 11.233 11.637
8+212.40 11.174 -6.40% 6.40% 10.980 11.384 11.204 11.608
8+213.80 11.145 -6.40% 6.40% 10.951 11.355 11.175 11.579
8+215.20 11.118 -6.40% 6.40% 10.924 11.328 11.148 11.552
8+216.60 11.091 -6.40% 6.40% 10.897 11.301 11.121 11.525
8+218.00 11.064 -6.40% 6.40% 10.870 11.274 11.094 11.498
8+219.40 11.039 -6.40% 6.40% 10.845 11.249 11.069 11.473
8+220.80 11.014 -6.40% 6.40% 10.820 11.224 11.044 11.448
8+222.20 10.988 -6.40% 6.40% 10.794 11.198 11.018 11.422
8+223.60 10.963 -6.40% 6.40% 10.769 11.173 10.993 11.397
8+225.00 10.938 -6.40% 6.40% 10.744 11.148 10.968 11.372
8+226.40 10.913 -6.40% 6.40% 10.719 11.123 10.943 11.347
8+227.80 10.888 -6.40% 6.40% 10.694 11.098 10.918 11.322
8+229.20 10.863 -6.40% 6.40% 10.669 11.073 10.893 11.297
8+230.60 10.838 -6.40% 6.40% 10.644 11.048 10.868 11.272

196 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+232.00 10.812 -6.40% 6.40% 10.618 11.022 10.842 11.246


8+233.40 10.787 -6.40% 6.40% 10.593 10.997 10.817 11.221
8+234.80 10.762 -6.40% 6.40% 10.568 10.972 10.792 11.196
8+236.20 10.737 -6.40% 6.40% 10.543 10.947 10.767 11.171
8+237.60 10.712 -6.40% 6.40% 10.518 10.922 10.742 11.146
8+239.00 10.687 -6.40% 6.40% 10.493 10.897 10.717 11.121
8+240.40 10.662 -6.40% 6.40% 10.468 10.872 10.692 11.096
8+241.80 10.636 -6.40% 6.40% 10.442 10.846 10.666 11.070
8+243.20 10.611 -6.40% 6.40% 10.417 10.821 10.641 11.045
8+244.60 10.586 -6.40% 6.40% 10.392 10.796 10.616 11.020
8+246.00 10.561 -6.40% 6.40% 10.367 10.771 10.591 10.995
8+247.40 10.536 -6.40% 6.40% 10.342 10.746 10.566 10.970
8+248.80 10.511 -6.40% 6.40% 10.317 10.721 10.541 10.945
8+250.20 10.486 -6.40% 6.40% 10.292 10.696 10.516 10.920
8+251.60 10.461 -6.40% 6.40% 10.267 10.671 10.491 10.895
8+253.00 10.435 -6.40% 6.40% 10.241 10.645 10.465 10.869
8+254.40 10.410 -6.40% 6.40% 10.216 10.620 10.440 10.844
8+255.80 10.385 -6.40% 6.40% 10.191 10.595 10.415 10.819
8+257.20 10.360 -6.40% 6.40% 10.166 10.570 10.390 10.794
8+258.60 10.335 -6.40% 6.40% 10.141 10.545 10.365 10.769
8+260.00 10.310 -6.40% 6.40% 10.116 10.520 10.340 10.744
8+261.40 10.285 -6.30% 6.30% 10.096 10.493 10.317 10.714
8+262.80 10.259 -6.10% 6.10% 10.080 10.464 10.294 10.678
8+264.20 10.234 -5.90% 5.89% 10.065 10.437 10.271 10.643
8+265.60 10.209 -5.71% 5.69% 10.049 10.409 10.249 10.608
8+267.00 10.184 -5.51% 5.49% 10.034 10.381 10.227 10.573
8+268.40 10.159 -5.31% 5.28% 10.019 10.353 10.205 10.538
8+269.80 10.134 -5.11% 5.08% 10.004 10.326 10.183 10.503
8+271.20 10.109 -4.91% 4.88% 9.988 10.298 10.161 10.468
8+272.60 10.083 -4.71% 4.67% 9.972 10.269 10.138 10.432

197 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+274.00 10.058 -4.51% 4.47% 9.957 10.241 10.115 10.397


8+275.40 10.033 -4.31% 4.27% 9.942 10.213 10.093 10.362
8+276.80 10.008 -4.11% 4.06% 9.926 10.186 10.071 10.327
8+278.20 9.983 -3.91% 3.86% 9.911 10.158 10.049 10.292
8+279.60 9.958 -3.71% 3.66% 9.896 10.130 10.027 10.257
8+281.00 9.933 -3.51% 3.45% 9.881 10.102 10.005 10.222
8+282.40 9.907 -3.32% 3.25% 9.865 10.073 9.982 10.186
8+283.80 9.882 -3.12% 3.05% 9.849 10.046 9.959 10.151
8+285.20 9.857 -3.00% 2.84% 9.830 10.019 9.937 10.116
8+286.60 9.832 -3.00% 2.64% 9.805 9.994 9.915 10.081
8+288.00 9.807 -3.00% 2.44% 9.780 9.969 9.893 10.046
8+289.40 9.782 -3.00% 2.23% 9.755 9.944 9.871 10.011
8+290.80 9.757 -3.00% 2.03% 9.730 9.919 9.849 9.976
8+292.20 9.731 -3.00% 1.82% 9.704 9.893 9.825 9.940
8+293.60 9.706 -3.00% 1.62% 9.679 9.868 9.803 9.905
8+295.00 9.681 -3.00% 1.42% 9.654 9.843 9.781 9.870
8+296.40 9.656 -3.00% 1.21% 9.629 9.818 9.759 9.836
8+297.80 9.631 -3.00% 1.01% 9.604 9.793 9.737 9.801
8+299.20 9.606 -3.00% 0.81% 9.579 9.768 9.715 9.766
8+300.60 9.581 -3.00% 0.60% 9.554 9.743 9.693 9.731
8+302.00 9.555 -3.00% 0.40% 9.528 9.717 9.669 9.695
8+303.40 9.530 -3.00% 0.20% 9.503 9.692 9.647 9.660
8+304.80 9.505 -3.00% -0.01% 9.478 9.667 9.625 9.625
8+306.20 9.480 -3.00% -0.21% 9.453 9.642 9.603 9.590
8+307.60 9.455 -3.00% -0.41% 9.428 9.617 9.581 9.555
8+309.00 9.430 -3.00% -0.62% 9.403 9.592 9.559 9.520
8+310.40 9.405 -3.00% -0.82% 9.378 9.567 9.536 9.485
8+311.80 9.380 -3.00% -1.02% 9.353 9.542 9.514 9.450
8+313.20 9.354 -3.00% -1.23% 9.327 9.516 9.491 9.414
8+314.60 9.329 -3.00% -1.43% 9.302 9.491 9.469 9.379

198 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+316.00 9.304 -3.00% -1.63% 9.277 9.466 9.447 9.344


8+317.40 9.279 -3.00% -1.84% 9.252 9.441 9.425 9.309
8+318.80 9.254 -3.00% -2.04% 9.227 9.416 9.403 9.274
8+320.20 9.229 -3.00% -2.24% 9.202 9.391 9.380 9.239
8+321.60 9.204 -3.00% -2.45% 9.177 9.366 9.358 9.204
8+323.00 9.178 -3.00% -2.65% 9.151 9.340 9.335 9.168
8+324.40 9.153 -3.00% -2.85% 9.126 9.315 9.313 9.133
8+325.80 9.128 -3.00% -3.00% 9.101 9.290 9.290 9.101
8+327.20 9.103 -3.00% -3.00% 9.076 9.265 9.265 9.076
8+328.60 9.078 -3.00% -3.00% 9.051 9.240 9.240 9.051
8+330.00 9.053 -3.00% -3.00% 9.026 9.215 9.215 9.026
8+331.40 9.028 -3.00% -3.00% 9.001 9.190 9.190 9.001
8+332.80 9.005 -3.00% -3.00% 8.978 9.167 9.167 8.978
8+334.20 8.982 -3.00% -3.00% 8.955 9.144 9.144 8.955
8+335.60 8.960 -3.00% -3.00% 8.933 9.122 9.122 8.933
8+337.00 8.939 -3.00% -3.00% 8.912 9.101 9.101 8.912
8+338.40 8.919 -3.00% -3.00% 8.892 9.081 9.081 8.892
8+339.80 8.900 -3.00% -3.00% 8.873 9.062 9.062 8.873
8+341.20 8.881 -3.00% -3.00% 8.854 9.043 9.043 8.854
8+342.60 8.864 -3.00% -3.00% 8.837 9.026 9.026 8.837
8+344.00 8.847 -3.00% -3.00% 8.820 9.009 9.009 8.820
8+345.40 8.831 -3.00% -3.00% 8.804 8.993 8.993 8.804
8+346.80 8.816 -3.00% -3.00% 8.789 8.978 8.978 8.789
8+348.20 8.802 -3.00% -3.00% 8.775 8.964 8.964 8.775
8+349.60 8.789 -3.00% -3.00% 8.762 8.951 8.951 8.762
8+351.00 8.776 -3.00% -3.00% 8.749 8.938 8.938 8.749
8+352.40 8.765 -3.00% -3.00% 8.738 8.927 8.927 8.738
8+353.80 8.754 -3.00% -3.00% 8.727 8.916 8.916 8.727
8+355.20 8.744 -3.00% -3.00% 8.717 8.906 8.906 8.717
8+356.60 8.735 -3.00% -3.00% 8.708 8.897 8.897 8.708

199 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+358.00 8.727 -3.00% -3.00% 8.700 8.889 8.889 8.700


8+359.40 8.719 -3.00% -3.00% 8.692 8.881 8.881 8.692
8+360.80 8.713 -3.00% -3.00% 8.686 8.875 8.875 8.686
8+362.20 8.707 -3.00% -3.00% 8.680 8.869 8.869 8.680
8+363.60 8.703 -3.00% -3.00% 8.676 8.865 8.865 8.676
8+365.00 8.699 -3.00% -3.00% 8.672 8.861 8.861 8.672
8+366.40 8.696 -3.00% -3.00% 8.669 8.858 8.858 8.669
8+367.80 8.693 -3.00% -3.00% 8.666 8.855 8.855 8.666
8+369.20 8.692 -3.00% -3.00% 8.665 8.854 8.854 8.665
8+370.60 8.691 -3.00% -3.00% 8.664 8.853 8.853 8.664
8+372.00 8.692 -3.00% -3.00% 8.665 8.854 8.854 8.665
8+373.40 8.693 -3.00% -3.00% 8.666 8.855 8.855 8.666
8+374.80 8.695 -3.00% -3.00% 8.668 8.857 8.857 8.668
8+376.20 8.698 -3.00% -3.00% 8.671 8.860 8.860 8.671
8+377.60 8.701 -3.00% -3.00% 8.674 8.863 8.863 8.674
8+379.00 8.706 -3.00% -3.00% 8.679 8.868 8.868 8.679
8+380.40 8.712 -3.00% -3.00% 8.685 8.874 8.874 8.685
8+381.80 8.718 -3.00% -3.00% 8.691 8.880 8.880 8.691
8+383.20 8.725 -3.00% -3.00% 8.698 8.887 8.887 8.698
8+384.60 8.733 -3.00% -3.00% 8.706 8.895 8.895 8.706
8+386.00 8.742 -3.00% -3.00% 8.715 8.904 8.904 8.715
8+387.40 8.751 -3.00% -3.00% 8.724 8.913 8.913 8.724
8+388.80 8.762 -3.00% -3.00% 8.735 8.924 8.924 8.735
8+390.20 8.773 -3.00% -3.00% 8.746 8.935 8.935 8.746
8+391.60 8.786 -3.00% -3.00% 8.759 8.948 8.948 8.759
8+393.00 8.799 -3.00% -3.00% 8.772 8.961 8.961 8.772
8+394.40 8.813 -3.00% -3.00% 8.786 8.975 8.975 8.786
8+395.80 8.828 -3.00% -3.00% 8.801 8.990 8.990 8.801
8+397.20 8.843 -3.00% -3.00% 8.816 9.005 9.005 8.816
8+398.60 8.860 -3.00% -3.00% 8.833 9.022 9.022 8.833

200 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+400.00 8.877 -3.00% -3.00% 8.850 9.039 9.039 8.850


8+401.40 8.895 -3.00% -3.00% 8.868 9.057 9.057 8.868
8+402.80 8.914 -3.00% -3.00% 8.887 9.076 9.076 8.887
8+404.20 8.934 -3.00% -3.00% 8.907 9.096 9.096 8.907
8+405.60 8.955 -3.00% -3.00% 8.928 9.117 9.117 8.928
8+407.00 8.977 -3.00% -3.00% 8.950 9.139 9.139 8.950
8+408.40 8.999 -3.00% -3.00% 8.972 9.161 9.161 8.972
8+409.80 9.022 -3.00% -3.00% 8.995 9.184 9.184 8.995
8+411.20 9.047 -3.00% -3.00% 9.020 9.209 9.209 9.020
8+412.60 9.072 -3.00% -3.00% 9.045 9.234 9.234 9.045
8+414.00 9.098 -3.00% -3.00% 9.071 9.260 9.260 9.071
8+415.40 9.124 -3.00% -3.00% 9.097 9.286 9.286 9.097
8+416.80 9.152 -3.00% -3.00% 9.125 9.314 9.314 9.125
8+418.20 9.180 -3.00% -3.00% 9.153 9.342 9.342 9.153
8+419.60 9.210 -3.00% -3.00% 9.183 9.372 9.372 9.183
8+421.00 9.240 -3.00% -3.00% 9.213 9.402 9.402 9.213
8+422.40 9.271 -3.00% -3.00% 9.244 9.433 9.433 9.244
8+423.80 9.303 -3.00% -3.00% 9.276 9.465 9.465 9.276
8+425.20 9.335 -3.00% -3.00% 9.308 9.497 9.497 9.308
8+426.60 9.369 -3.00% -3.00% 9.342 9.531 9.531 9.342
8+428.00 9.403 -3.00% -3.00% 9.376 9.565 9.565 9.376
8+429.40 9.439 -3.00% -3.00% 9.412 9.601 9.601 9.412
8+430.80 9.475 -3.00% -3.00% 9.448 9.637 9.637 9.448
8+432.20 9.512 -3.00% -3.00% 9.485 9.674 9.674 9.485
8+433.60 9.549 -3.00% -3.00% 9.522 9.711 9.711 9.522
8+435.00 9.588 -3.00% -3.00% 9.561 9.750 9.750 9.561
8+436.40 9.628 -3.00% -3.00% 9.601 9.790 9.790 9.601
8+437.80 9.668 -3.00% -3.00% 9.641 9.830 9.830 9.641
8+439.20 9.709 -3.00% -3.00% 9.682 9.871 9.871 9.682
8+440.60 9.751 -3.00% -3.00% 9.724 9.913 9.913 9.724

201 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+442.00 9.794 -3.00% -3.00% 9.767 9.956 9.956 9.767


8+443.40 9.838 -3.00% -3.00% 9.811 10.000 10.000 9.811
8+444.80 9.883 -3.00% -3.00% 9.856 10.045 10.045 9.856
8+446.20 9.928 -3.00% -3.00% 9.901 10.090 10.090 9.901
8+447.60 9.974 -3.00% -3.00% 9.947 10.136 10.136 9.947
8+449.00 10.022 -3.00% -3.00% 9.995 10.184 10.184 9.995
8+450.40 10.070 -3.00% -3.00% 10.043 10.232 10.232 10.043
8+451.80 10.119 -3.00% -3.00% 10.092 10.281 10.281 10.092
8+453.20 10.168 -3.00% -3.00% 10.141 10.330 10.330 10.141
8+454.60 10.219 -3.00% -3.00% 10.192 10.381 10.381 10.192
8+456.00 10.270 -3.00% -3.00% 10.243 10.432 10.432 10.243
8+457.40 10.323 -3.00% -3.00% 10.296 10.485 10.485 10.296
8+458.80 10.376 -3.00% -3.00% 10.349 10.538 10.538 10.349
8+460.20 10.430 -3.00% -3.00% 10.403 10.592 10.592 10.403
8+461.60 10.485 -3.00% -3.00% 10.458 10.647 10.647 10.458
8+463.00 10.540 -3.00% -3.00% 10.513 10.702 10.702 10.513
8+464.40 10.597 -3.00% -3.00% 10.570 10.759 10.759 10.570
8+465.80 10.654 -3.00% -3.00% 10.627 10.816 10.816 10.627
8+467.20 10.713 -3.00% -3.00% 10.686 10.875 10.875 10.686
8+468.60 10.772 -3.00% -3.00% 10.745 10.934 10.934 10.745
8+470.00 10.832 -3.00% -3.00% 10.805 10.994 10.994 10.805
8+471.40 10.893 -3.00% -3.00% 10.866 11.055 11.055 10.866
8+472.80 10.954 -3.00% -3.00% 10.927 11.116 11.116 10.927
8+474.20 11.017 -3.00% -3.00% 10.990 11.179 11.179 10.990
8+475.60 11.080 -3.00% -3.00% 11.053 11.242 11.242 11.053
8+477.00 11.144 -3.00% -3.00% 11.117 11.306 11.306 11.117
8+478.40 11.207 -3.00% -3.00% 11.180 11.369 11.369 11.180
8+479.80 11.270 -3.00% -3.00% 11.243 11.432 11.432 11.243
8+481.20 11.334 -3.00% -3.00% 11.307 11.496 11.496 11.307
8+482.60 11.397 -3.00% -3.00% 11.370 11.559 11.559 11.370

202 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+484.00 11.461 -3.00% -3.00% 11.434 11.623 11.623 11.434


8+485.40 11.524 -3.00% -3.00% 11.497 11.686 11.686 11.497
8+486.80 11.588 -3.00% -3.00% 11.561 11.750 11.750 11.561
8+488.20 11.651 -3.00% -3.00% 11.624 11.813 11.813 11.624
8+489.60 11.714 -3.00% -3.00% 11.687 11.876 11.876 11.687
8+491.00 11.778 -3.00% -3.00% 11.751 11.940 11.940 11.751
8+492.40 11.841 -3.00% -3.00% 11.814 12.003 12.003 11.814
8+493.80 11.905 -3.00% -3.00% 11.878 12.067 12.067 11.878
8+495.20 11.968 -3.00% -3.00% 11.941 12.130 12.130 11.941
8+496.60 12.032 -3.00% -3.00% 12.005 12.194 12.194 12.005
8+498.00 12.095 -3.00% -3.00% 12.068 12.257 12.257 12.068
8+499.40 12.158 -3.00% -3.00% 12.131 12.320 12.320 12.131
8+500.80 12.222 -3.00% -3.00% 12.195 12.384 12.384 12.195
8+502.20 12.285 -3.00% -3.00% 12.258 12.447 12.447 12.258
8+503.60 12.349 -3.00% -3.00% 12.322 12.511 12.511 12.322
8+505.00 12.412 -3.00% -3.00% 12.385 12.574 12.574 12.385
8+506.40 12.476 -3.00% -3.00% 12.449 12.638 12.638 12.449
8+507.80 12.539 -3.00% -3.00% 12.512 12.701 12.701 12.512
8+509.20 12.602 -3.00% -3.00% 12.575 12.764 12.764 12.575
8+510.60 12.666 -3.00% -3.00% 12.639 12.828 12.828 12.639
8+512.00 12.729 -3.00% -3.00% 12.702 12.891 12.891 12.702
8+513.40 12.793 -3.00% -3.00% 12.766 12.955 12.955 12.766
8+514.80 12.856 -3.00% -3.00% 12.829 13.018 13.018 12.829
8+516.20 12.920 -3.00% -3.00% 12.893 13.082 13.082 12.893
8+517.60 12.983 -3.00% -3.00% 12.956 13.145 13.145 12.956
8+519.00 13.046 -3.00% -3.00% 13.019 13.208 13.208 13.019
8+520.40 13.110 -3.00% -3.00% 13.083 13.272 13.272 13.083
8+521.80 13.173 -3.00% -3.00% 13.146 13.335 13.335 13.146
8+523.20 13.237 -3.00% -3.00% 13.210 13.399 13.399 13.210
8+524.60 13.300 -3.00% -3.00% 13.273 13.462 13.462 13.273

203 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+526.00 13.364 -3.00% -3.00% 13.337 13.526 13.526 13.337


8+527.40 13.427 -3.00% -3.00% 13.400 13.589 13.589 13.400
8+528.80 13.490 -3.00% -3.00% 13.463 13.652 13.652 13.463
8+530.20 13.554 -3.00% -3.00% 13.527 13.716 13.716 13.527
8+531.60 13.617 -3.00% -3.00% 13.590 13.779 13.779 13.590
8+533.00 13.681 -3.00% -3.00% 13.654 13.843 13.843 13.654
8+534.40 13.744 -3.00% -3.00% 13.717 13.906 13.906 13.717
8+535.80 13.808 -3.00% -3.00% 13.781 13.970 13.970 13.781
8+537.20 13.871 -3.00% -3.00% 13.844 14.033 14.033 13.844
8+538.60 13.934 -3.00% -3.00% 13.907 14.096 14.096 13.907
8+540.00 13.995 -3.00% -3.00% 13.968 14.157 14.157 13.968
8+541.40 14.055 -3.00% -3.00% 14.028 14.217 14.217 14.028
8+542.80 14.114 -3.00% -3.00% 14.087 14.276 14.276 14.087
8+544.20 14.172 -3.00% -3.00% 14.145 14.334 14.334 14.145
8+545.60 14.229 -3.00% -3.00% 14.202 14.391 14.391 14.202
8+547.00 14.285 -3.00% -3.00% 14.258 14.447 14.447 14.258
8+548.40 14.339 -3.00% -3.00% 14.312 14.501 14.501 14.312
8+549.80 14.393 -3.00% -3.00% 14.366 14.555 14.555 14.366
8+551.20 14.445 -3.00% -3.00% 14.418 14.607 14.607 14.418
8+552.60 14.496 -3.00% -3.00% 14.469 14.658 14.658 14.469
8+554.00 14.546 -3.00% -3.00% 14.519 14.708 14.708 14.519
8+555.40 14.595 -3.00% -3.00% 14.568 14.757 14.757 14.568
8+556.80 14.642 -3.00% -3.00% 14.615 14.804 14.804 14.615
8+558.20 14.689 -3.00% -3.00% 14.662 14.851 14.851 14.662
8+559.60 14.734 -3.00% -3.00% 14.707 14.896 14.896 14.707
8+561.00 14.778 -3.00% -3.00% 14.751 14.940 14.940 14.751
8+562.40 14.821 -3.00% -3.00% 14.794 14.983 14.983 14.794
8+563.80 14.863 -3.00% -3.00% 14.836 15.025 15.025 14.836
8+565.20 14.904 -3.00% -3.00% 14.877 15.066 15.066 14.877
8+566.60 14.943 -3.00% -3.00% 14.916 15.105 15.105 14.916

204 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+568.00 14.982 -3.00% -3.00% 14.955 15.144 15.144 14.955


8+569.40 15.019 -3.00% -3.00% 14.992 15.181 15.181 14.992
8+570.80 15.055 -3.00% -3.00% 15.028 15.217 15.217 15.028
8+572.20 15.090 -3.00% -3.00% 15.063 15.252 15.252 15.063
8+573.60 15.124 -3.00% -3.00% 15.097 15.286 15.286 15.097
8+575.00 15.156 -3.00% -3.00% 15.129 15.318 15.318 15.129
8+576.40 15.188 -3.00% -3.00% 15.161 15.350 15.350 15.161
8+577.80 15.218 -3.00% -3.00% 15.191 15.380 15.380 15.191
8+579.20 15.247 -3.00% -3.00% 15.220 15.409 15.409 15.220
8+580.60 15.275 -3.00% -3.00% 15.248 15.437 15.437 15.248
8+582.00 15.302 -3.00% -3.00% 15.275 15.464 15.464 15.275
8+583.40 15.328 -3.00% -3.00% 15.301 15.490 15.490 15.301
8+584.80 15.352 -3.00% -3.00% 15.325 15.514 15.514 15.325
8+586.20 15.376 -3.00% -3.00% 15.349 15.538 15.538 15.349
8+587.60 15.398 -3.00% -3.00% 15.371 15.560 15.560 15.371
8+589.00 15.419 -3.00% -3.00% 15.392 15.581 15.581 15.392
8+590.40 15.439 -3.00% -3.00% 15.412 15.601 15.601 15.412
8+591.80 15.458 -3.00% -3.00% 15.431 15.620 15.620 15.431
8+593.20 15.476 -3.00% -3.00% 15.449 15.638 15.638 15.449
8+594.60 15.492 -3.00% -3.00% 15.465 15.654 15.654 15.465
8+596.00 15.507 -3.00% -3.00% 15.480 15.669 15.669 15.480
8+597.40 15.522 -3.00% -3.00% 15.495 15.684 15.684 15.495
8+598.80 15.535 -3.00% -3.00% 15.508 15.697 15.697 15.508
8+600.20 15.546 -3.00% -3.00% 15.519 15.708 15.708 15.519
8+601.60 15.557 -3.00% -3.00% 15.530 15.719 15.719 15.530
8+603.00 15.567 -3.00% -3.00% 15.540 15.729 15.729 15.540
8+604.40 15.575 -3.00% -3.00% 15.548 15.737 15.737 15.548
8+605.80 15.582 -3.00% -3.00% 15.555 15.744 15.744 15.555
8+607.20 15.588 -3.00% -3.00% 15.561 15.750 15.750 15.561
8+608.60 15.593 -3.00% -3.00% 15.566 15.755 15.755 15.566

205 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+610.00 15.597 -3.00% -3.00% 15.570 15.759 15.759 15.570


8+611.40 15.600 -3.00% -3.00% 15.573 15.762 15.762 15.573
8+612.80 15.601 -3.00% -3.00% 15.574 15.763 15.763 15.574
8+614.20 15.602 -3.00% -3.00% 15.575 15.764 15.764 15.575
8+615.60 15.601 -3.00% -3.00% 15.574 15.763 15.763 15.574
8+617.00 15.599 -3.00% -3.00% 15.572 15.761 15.761 15.572
8+618.40 15.596 -3.00% -3.00% 15.569 15.758 15.758 15.569
8+619.80 15.592 -3.00% -3.00% 15.565 15.754 15.754 15.565
8+621.20 15.586 -3.00% -3.00% 15.559 15.748 15.748 15.559
8+622.60 15.580 -3.00% -3.00% 15.553 15.742 15.742 15.553
8+624.00 15.572 -3.00% -3.00% 15.545 15.734 15.734 15.545
8+625.40 15.563 -3.00% -3.00% 15.536 15.725 15.725 15.536
8+626.80 15.553 -3.00% -3.00% 15.526 15.715 15.715 15.526
8+628.20 15.542 -3.00% -3.00% 15.515 15.704 15.704 15.515
8+629.60 15.529 -3.00% -3.00% 15.502 15.691 15.691 15.502
8+631.00 15.516 -3.00% -3.00% 15.489 15.678 15.678 15.489
8+632.40 15.501 -3.00% -3.00% 15.474 15.663 15.663 15.474
8+633.80 15.485 -3.00% -3.00% 15.458 15.647 15.647 15.458
8+635.20 15.468 -3.00% -3.00% 15.441 15.630 15.630 15.441
8+636.60 15.450 -3.00% -3.00% 15.423 15.612 15.612 15.423
8+638.00 15.431 -3.00% -3.00% 15.404 15.593 15.593 15.404
8+639.40 15.411 -3.00% -3.00% 15.384 15.573 15.573 15.384
8+640.80 15.389 -3.00% -3.00% 15.362 15.551 15.551 15.362
8+642.20 15.366 -3.00% -3.00% 15.339 15.528 15.528 15.339
8+643.60 15.343 -3.00% -3.00% 15.316 15.505 15.505 15.316
8+645.00 15.317 -3.00% -3.00% 15.290 15.479 15.479 15.290
8+646.40 15.291 -3.00% -3.00% 15.264 15.453 15.453 15.264
8+647.80 15.264 -3.00% -3.00% 15.237 15.426 15.426 15.237
8+649.20 15.236 -3.00% -3.00% 15.209 15.398 15.398 15.209
8+650.60 15.206 -3.00% -3.00% 15.179 15.368 15.368 15.179

206 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+652.00 15.175 -3.00% -3.00% 15.148 15.337 15.337 15.148


8+653.40 15.143 -3.00% -3.00% 15.116 15.305 15.305 15.116
8+654.80 15.110 -3.00% -3.00% 15.083 15.272 15.272 15.083
8+656.20 15.076 -3.00% -3.00% 15.049 15.238 15.238 15.049
8+657.60 15.040 -3.00% -3.00% 15.013 15.202 15.202 15.013
8+659.00 15.004 -3.00% -3.00% 14.977 15.166 15.166 14.977
8+660.40 14.966 -3.00% -3.00% 14.939 15.128 15.128 14.939
8+661.80 14.928 -3.00% -3.00% 14.901 15.090 15.090 14.901
8+663.20 14.889 -3.00% -3.00% 14.862 15.051 15.051 14.862
8+664.60 14.851 -3.00% -3.00% 14.824 15.013 15.013 14.824
8+666.00 14.812 -3.00% -3.00% 14.785 14.974 14.974 14.785
8+667.40 14.774 -3.00% -3.00% 14.747 14.936 14.936 14.747
8+668.80 14.735 -3.00% -3.00% 14.708 14.897 14.897 14.708
8+670.20 14.697 -3.00% -3.00% 14.670 14.859 14.859 14.670
8+671.60 14.659 -3.00% -3.00% 14.632 14.821 14.821 14.632
8+673.00 14.620 -3.00% -3.00% 14.593 14.782 14.782 14.593
8+674.40 14.582 -3.00% -3.00% 14.555 14.744 14.744 14.555
8+675.80 14.543 -3.00% -3.00% 14.516 14.705 14.705 14.516
8+677.20 14.505 -3.00% -3.00% 14.478 14.667 14.667 14.478
8+678.60 14.466 -3.00% -3.00% 14.439 14.628 14.628 14.439
8+680.00 14.428 -3.00% -3.00% 14.401 14.590 14.590 14.401
8+681.40 14.389 -3.00% -3.00% 14.362 14.551 14.551 14.362
8+682.80 14.351 -3.00% -3.00% 14.324 14.513 14.513 14.324
8+684.20 14.312 -3.00% -3.00% 14.285 14.474 14.474 14.285
8+685.60 14.274 -3.00% -3.00% 14.247 14.436 14.436 14.247
8+687.00 14.236 -3.00% -3.00% 14.209 14.398 14.398 14.209
8+688.40 14.197 -3.00% -3.00% 14.170 14.359 14.359 14.170
8+689.80 14.159 -3.00% -3.00% 14.132 14.321 14.321 14.132
8+691.20 14.120 -3.00% -3.00% 14.093 14.282 14.282 14.093
8+692.60 14.082 -3.00% -3.00% 14.055 14.244 14.244 14.055

207 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+694.00 14.043 -3.00% -3.00% 14.016 14.205 14.205 14.016


8+695.40 14.005 -3.00% -3.00% 13.978 14.167 14.167 13.978
8+696.80 13.966 -3.00% -3.00% 13.939 14.128 14.128 13.939
8+698.20 13.928 -3.00% -3.00% 13.901 14.090 14.090 13.901
8+699.60 13.889 -3.00% -3.00% 13.862 14.051 14.051 13.862
8+701.00 13.851 -3.00% -3.00% 13.824 14.013 14.013 13.824
8+702.40 13.813 -3.00% -3.00% 13.786 13.975 13.975 13.786
8+703.80 13.774 -3.00% -3.00% 13.747 13.936 13.936 13.747
8+705.20 13.736 -3.00% -3.00% 13.709 13.898 13.898 13.709
8+706.60 13.697 -3.00% -3.00% 13.670 13.859 13.859 13.670
8+708.00 13.659 -3.00% -3.00% 13.632 13.821 13.821 13.632
8+709.40 13.620 -3.00% -3.00% 13.593 13.782 13.782 13.593
8+710.80 13.582 -3.00% -3.00% 13.555 13.744 13.744 13.555
8+712.20 13.543 -3.00% -3.00% 13.516 13.705 13.705 13.516
8+713.60 13.505 -3.00% -3.00% 13.478 13.667 13.667 13.478
8+715.00 13.466 -3.00% -3.00% 13.439 13.628 13.628 13.439
8+716.40 13.428 -3.00% -3.00% 13.401 13.590 13.590 13.401
8+717.80 13.390 -3.00% -3.00% 13.363 13.552 13.552 13.363
8+719.20 13.351 -3.00% -3.00% 13.324 13.513 13.513 13.324
8+720.60 13.313 -3.00% -3.00% 13.286 13.475 13.475 13.286
8+722.00 13.274 -3.00% -3.00% 13.247 13.436 13.436 13.247
8+723.40 13.236 -3.00% -3.00% 13.209 13.398 13.398 13.209
8+724.80 13.197 -3.00% -3.00% 13.170 13.359 13.359 13.170
8+726.20 13.159 -3.00% -3.00% 13.132 13.321 13.321 13.132
8+727.60 13.120 -3.00% -3.00% 13.093 13.282 13.282 13.093
8+729.00 13.082 -3.00% -3.00% 13.055 13.244 13.244 13.055
8+730.40 13.043 -3.00% -3.00% 13.016 13.205 13.205 13.016
8+731.80 13.005 -3.00% -3.00% 12.978 13.167 13.167 12.978
8+733.20 12.967 -3.00% -3.00% 12.940 13.129 13.129 12.940
8+734.60 12.928 -3.00% -3.00% 12.901 13.090 13.090 12.901

208 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+736.00 12.890 -3.00% -3.00% 12.863 13.052 13.052 12.863


8+737.40 12.851 -3.00% -3.00% 12.824 13.013 13.013 12.824
8+738.80 12.813 -3.00% -3.00% 12.786 12.975 12.975 12.786
8+740.20 12.774 -3.00% -3.00% 12.747 12.936 12.936 12.747
8+741.60 12.736 -3.00% -3.00% 12.709 12.898 12.898 12.709
8+743.00 12.697 -3.00% -3.00% 12.670 12.859 12.859 12.670
8+744.40 12.659 -3.00% -3.00% 12.632 12.821 12.821 12.632
8+745.80 12.620 -3.00% -3.00% 12.593 12.782 12.782 12.593
8+747.20 12.582 -3.00% -3.00% 12.555 12.744 12.744 12.555
8+748.60 12.544 -3.00% -3.00% 12.517 12.706 12.706 12.517
8+750.00 12.505 -3.00% -3.00% 12.478 12.667 12.667 12.478
8+751.40 12.467 -3.00% -3.00% 12.440 12.629 12.629 12.440
8+752.80 12.428 -3.00% -3.00% 12.401 12.590 12.590 12.401
8+754.20 12.390 -3.00% -3.00% 12.363 12.552 12.552 12.363
8+755.60 12.352 -3.00% -3.00% 12.325 12.514 12.514 12.325
8+757.00 12.314 -3.00% -3.00% 12.287 12.476 12.476 12.287
8+758.40 12.276 -3.00% -3.00% 12.249 12.438 12.438 12.249
8+759.80 12.239 -3.00% -3.00% 12.212 12.401 12.401 12.212
8+761.20 12.202 -3.00% -3.00% 12.175 12.364 12.364 12.175
8+762.60 12.165 -3.00% -3.00% 12.138 12.327 12.327 12.138
8+764.00 12.129 -3.00% -3.00% 12.102 12.291 12.291 12.102
8+765.40 12.093 -3.00% -3.00% 12.066 12.255 12.255 12.066
8+766.80 12.057 -3.00% -3.00% 12.030 12.219 12.219 12.030
8+768.20 12.022 -3.00% -3.00% 11.995 12.184 12.184 11.995
8+769.60 11.987 -3.00% -3.00% 11.960 12.149 12.149 11.960
8+771.00 11.952 -3.00% -3.00% 11.925 12.114 12.114 11.925
8+772.40 11.918 -3.00% -3.00% 11.891 12.080 12.080 11.891
8+773.80 11.884 -3.00% -3.00% 11.857 12.046 12.046 11.857
8+775.20 11.850 -3.00% -3.00% 11.823 12.012 12.012 11.823
8+776.60 11.817 -3.00% -3.00% 11.790 11.979 11.979 11.790

209 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+778.00 11.783 -3.00% -3.00% 11.756 11.945 11.945 11.756


8+779.40 11.751 -3.00% -3.00% 11.724 11.913 11.913 11.724
8+780.80 11.718 -3.00% -3.00% 11.691 11.880 11.880 11.691
8+782.20 11.686 -3.00% -3.00% 11.659 11.848 11.848 11.659
8+783.60 11.654 -3.00% -3.00% 11.627 11.816 11.816 11.627
8+785.00 11.623 -3.00% -3.00% 11.596 11.785 11.785 11.596
8+786.40 11.591 -3.00% -3.00% 11.564 11.753 11.753 11.564
8+787.80 11.560 -3.00% -3.00% 11.533 11.722 11.722 11.533
8+789.20 11.530 -3.00% -3.00% 11.503 11.692 11.692 11.503
8+790.60 11.500 -2.95% -3.00% 11.476 11.661 11.662 11.473
8+792.00 11.470 -2.75% -3.00% 11.455 11.628 11.632 11.443
8+793.40 11.440 -2.54% -3.00% 11.435 11.596 11.602 11.413
8+794.80 11.411 -2.34% -3.00% 11.416 11.564 11.573 11.384
8+796.20 11.382 -2.14% -3.00% 11.397 11.532 11.544 11.355
8+797.60 11.353 -1.93% -3.00% 11.378 11.500 11.515 11.326
8+799.00 11.325 -1.73% -3.00% 11.360 11.469 11.487 11.298
8+800.40 11.297 -1.53% -3.00% 11.342 11.438 11.459 11.270
8+801.80 11.269 -1.33% -3.00% 11.324 11.408 11.431 11.242
8+803.20 11.241 -1.12% -3.00% 11.306 11.377 11.403 11.214
8+804.60 11.214 -0.92% -3.00% 11.289 11.347 11.376 11.187
8+806.00 11.188 -0.72% -3.00% 11.273 11.318 11.350 11.161
8+807.40 11.161 -0.52% -3.00% 11.256 11.288 11.323 11.134
8+808.80 11.135 -0.31% -3.00% 11.240 11.259 11.297 11.108
8+810.20 11.109 -0.11% -3.00% 11.224 11.231 11.271 11.082
8+811.60 11.084 0.09% -3.00% 11.208 11.203 11.246 11.057
8+813.00 11.058 0.29% -3.00% 11.192 11.174 11.220 11.031
8+814.40 11.034 0.50% -3.00% 11.178 11.147 11.196 11.007
8+815.80 11.009 0.70% -3.00% 11.163 11.119 11.171 10.982
8+817.20 10.985 0.90% -3.00% 11.149 11.092 11.147 10.958
8+818.60 10.961 1.10% -3.00% 11.135 11.066 11.123 10.934

210 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+820.00 10.937 1.31% -3.00% 11.121 11.039 11.099 10.910


8+821.40 10.914 1.51% -3.00% 11.108 11.013 11.076 10.887
8+822.80 10.891 1.71% -3.00% 11.095 10.987 11.053 10.864
8+824.20 10.868 1.92% -3.00% 11.082 10.961 11.030 10.841
8+825.60 10.846 2.12% -3.00% 11.070 10.936 11.008 10.819
8+827.00 10.824 2.32% -3.00% 11.058 10.912 10.986 10.797
8+828.40 10.802 2.52% -3.00% 11.046 10.887 10.964 10.775
8+829.80 10.781 2.73% -3.00% 11.035 10.863 10.943 10.754
8+831.20 10.760 2.93% -3.03% 11.023 10.839 10.922 10.732
8+832.60 10.739 3.13% -3.23% 11.012 10.815 10.904 10.701
8+834.00 10.719 3.33% -3.42% 11.002 10.792 10.887 10.671
8+835.40 10.699 3.54% -3.62% 10.992 10.769 10.870 10.641
8+836.80 10.679 3.74% -3.82% 10.982 10.747 10.852 10.612
8+838.20 10.659 3.94% -4.02% 10.972 10.724 10.835 10.582
8+839.60 10.640 4.14% -4.22% 10.963 10.702 10.819 10.553
8+841.00 10.621 4.35% -4.42% 10.954 10.680 10.803 10.525
8+842.40 10.603 4.55% -4.62% 10.946 10.659 10.788 10.497
8+843.80 10.585 4.75% -4.81% 10.938 10.638 10.772 10.469
8+845.20 10.567 4.95% -5.01% 10.930 10.618 10.757 10.441
8+846.60 10.549 5.16% -5.21% 10.922 10.597 10.742 10.414
8+848.00 10.532 5.36% -5.41% 10.915 10.577 10.728 10.387
8+849.40 10.515 5.56% -5.61% 10.908 10.557 10.714 10.360
8+850.80 10.498 5.77% -5.81% 10.900 10.537 10.699 10.333
8+852.20 10.482 5.97% -6.00% 10.894 10.518 10.686 10.308
8+853.60 10.466 6.17% -6.20% 10.888 10.500 10.673 10.282
8+855.00 10.450 6.37% -6.40% 10.882 10.481 10.660 10.256
8+856.40 10.435 6.58% -6.60% 10.877 10.463 10.647 10.232
8+857.80 10.420 6.78% -6.80% 10.872 10.445 10.635 10.207
8+859.20 10.405 6.98% -7.00% 10.867 10.427 10.623 10.182
8+860.60 10.391 7.18% -7.20% 10.863 10.410 10.612 10.158

211 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+862.00 10.377 7.39% -7.39% 10.859 10.394 10.601 10.135


8+863.40 10.363 7.59% -7.59% 10.855 10.377 10.589 10.111
8+864.80 10.350 7.79% -7.79% 10.852 10.361 10.579 10.088
8+866.20 10.337 7.80% -7.80% 10.839 10.348 10.566 10.075
8+867.60 10.324 7.80% -7.80% 10.826 10.335 10.553 10.062
8+869.00 10.311 7.80% -7.80% 10.813 10.322 10.540 10.049
8+870.40 10.299 7.80% -7.80% 10.801 10.310 10.528 10.037
8+871.80 10.287 7.80% -7.80% 10.789 10.298 10.516 10.025
8+873.20 10.276 7.80% -7.80% 10.778 10.287 10.505 10.014
8+874.60 10.265 7.80% -7.80% 10.767 10.276 10.494 10.003
8+876.00 10.254 7.80% -7.80% 10.756 10.265 10.483 9.992
8+877.40 10.243 7.80% -7.80% 10.745 10.254 10.472 9.981
8+878.80 10.233 7.80% -7.80% 10.735 10.244 10.462 9.971
8+880.20 10.223 7.80% -7.80% 10.725 10.234 10.452 9.961
8+881.60 10.213 7.80% -7.80% 10.715 10.224 10.442 9.951
8+883.00 10.204 7.80% -7.80% 10.706 10.215 10.433 9.942
8+884.40 10.195 7.80% -7.80% 10.697 10.206 10.424 9.933
8+885.80 10.186 7.80% -7.80% 10.688 10.197 10.415 9.924
8+887.20 10.177 7.80% -7.80% 10.679 10.188 10.406 9.915
8+888.60 10.168 7.80% -7.80% 10.670 10.179 10.397 9.906
8+890.00 10.159 7.80% -7.80% 10.661 10.170 10.388 9.897
8+891.40 10.150 7.80% -7.80% 10.652 10.161 10.379 9.888
8+892.80 10.141 7.80% -7.80% 10.643 10.152 10.370 9.879
8+894.20 10.132 7.80% -7.80% 10.634 10.143 10.361 9.870
8+895.60 10.123 7.80% -7.80% 10.625 10.134 10.352 9.861
8+897.00 10.114 7.80% -7.80% 10.616 10.125 10.343 9.852
8+898.40 10.105 7.80% -7.80% 10.607 10.116 10.334 9.843
8+899.80 10.096 7.80% -7.80% 10.598 10.107 10.325 9.834
8+901.20 10.087 7.80% -7.80% 10.589 10.098 10.316 9.825
8+902.60 10.078 7.80% -7.80% 10.580 10.089 10.307 9.816

212 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+904.00 10.069 7.80% -7.80% 10.571 10.080 10.298 9.807


8+905.40 10.060 7.80% -7.80% 10.562 10.071 10.289 9.798
8+906.80 10.051 7.80% -7.80% 10.553 10.062 10.280 9.789
8+908.20 10.042 7.80% -7.80% 10.544 10.053 10.271 9.780
8+909.60 10.033 7.80% -7.80% 10.535 10.044 10.262 9.771
8+911.00 10.024 7.80% -7.80% 10.526 10.035 10.253 9.762
8+912.40 10.015 7.80% -7.80% 10.517 10.026 10.244 9.753
8+913.80 10.005 7.80% -7.80% 10.507 10.016 10.234 9.743
8+915.20 9.996 7.80% -7.80% 10.498 10.007 10.225 9.734
8+916.60 9.987 7.80% -7.80% 10.489 9.998 10.216 9.725
8+918.00 9.978 7.80% -7.80% 10.480 9.989 10.207 9.716
8+919.40 9.969 7.80% -7.80% 10.471 9.980 10.198 9.707
8+920.80 9.960 7.80% -7.80% 10.462 9.971 10.189 9.698
8+922.20 9.951 7.80% -7.80% 10.453 9.962 10.180 9.689
8+923.60 9.942 7.80% -7.80% 10.444 9.953 10.171 9.680
8+925.00 9.933 7.80% -7.80% 10.435 9.944 10.162 9.671
8+926.40 9.924 7.80% -7.80% 10.426 9.935 10.153 9.662
8+927.80 9.915 7.80% -7.80% 10.417 9.926 10.144 9.653
8+929.20 9.906 7.80% -7.80% 10.408 9.917 10.135 9.644
8+930.60 9.897 7.80% -7.80% 10.399 9.908 10.126 9.635
8+932.00 9.888 7.80% -7.80% 10.390 9.899 10.117 9.626
8+933.40 9.879 7.80% -7.80% 10.381 9.890 10.108 9.617
8+934.80 9.870 7.80% -7.80% 10.372 9.881 10.099 9.608
8+936.20 9.861 7.80% -7.80% 10.363 9.872 10.090 9.599
8+937.60 9.852 7.80% -7.80% 10.354 9.863 10.081 9.590
8+939.00 9.843 7.80% -7.80% 10.345 9.854 10.072 9.581
8+940.40 9.834 7.80% -7.80% 10.336 9.845 10.063 9.572
8+941.80 9.825 7.80% -7.80% 10.327 9.836 10.054 9.563
8+943.20 9.816 7.80% -7.80% 10.318 9.827 10.045 9.554
8+944.60 9.807 7.79% -7.79% 10.309 9.818 10.036 9.545

213 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+946.00 9.798 7.79% -7.79% 10.300 9.809 10.027 9.536


8+947.40 9.789 7.78% -7.78% 10.290 9.800 10.018 9.528
8+948.80 9.780 7.78% -7.78% 10.281 9.791 10.009 9.519
8+950.20 9.771 7.77% -7.77% 10.272 9.782 10.000 9.510
8+951.60 9.762 7.77% -7.77% 10.263 9.773 9.991 9.501
8+953.00 9.753 7.76% -7.76% 10.253 9.764 9.982 9.493
8+954.40 9.744 7.76% -7.76% 10.244 9.755 9.973 9.484
8+955.80 9.735 7.75% -7.75% 10.235 9.746 9.964 9.475
8+957.20 9.726 7.75% -7.75% 10.226 9.738 9.954 9.466
8+958.60 9.717 7.74% -7.74% 10.216 9.729 9.945 9.458
8+960.00 9.708 7.73% -7.73% 10.207 9.720 9.936 9.449
8+961.40 9.699 7.73% -7.73% 10.198 9.711 9.927 9.440
8+962.80 9.690 7.72% -7.72% 10.188 9.702 9.918 9.432
8+964.20 9.681 7.72% -7.72% 10.179 9.693 9.909 9.423
8+965.60 9.672 7.71% -7.71% 10.170 9.684 9.900 9.414
8+967.00 9.663 7.71% -7.71% 10.161 9.675 9.891 9.405
8+968.40 9.654 7.70% -7.70% 10.151 9.666 9.882 9.397
8+969.80 9.645 7.70% -7.70% 10.142 9.657 9.873 9.388
8+971.20 9.636 7.69% -7.69% 10.133 9.648 9.864 9.379
8+972.60 9.627 7.69% -7.69% 10.124 9.639 9.855 9.370
8+974.00 9.618 7.68% -7.68% 10.114 9.630 9.846 9.362
8+975.40 9.609 7.67% -7.67% 10.105 9.622 9.836 9.353
8+976.80 9.600 7.67% -7.67% 10.096 9.613 9.827 9.344
8+978.20 9.591 7.66% -7.66% 10.087 9.604 9.818 9.335
8+979.60 9.582 7.66% -7.66% 10.077 9.595 9.809 9.327
8+981.00 9.573 7.65% -7.65% 10.068 9.586 9.800 9.318
8+982.40 9.564 7.65% -7.65% 10.059 9.577 9.791 9.309
8+983.80 9.555 7.64% -7.64% 10.049 9.568 9.782 9.301
8+985.20 9.546 7.64% -7.64% 10.040 9.559 9.773 9.292
8+986.60 9.537 7.63% -7.63% 10.031 9.550 9.764 9.283

214 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

8+988.00 9.528 7.63% -7.63% 10.022 9.541 9.755 9.274


8+989.40 9.519 7.62% -7.62% 10.012 9.532 9.746 9.266
8+990.80 9.510 7.62% -7.62% 10.003 9.523 9.737 9.257
8+992.20 9.501 7.61% -7.61% 9.994 9.514 9.728 9.248
8+993.60 9.492 7.60% -7.60% 9.985 9.506 9.718 9.239
8+995.00 9.483 7.60% -7.60% 9.975 9.497 9.709 9.231
8+996.40 9.474 7.59% -7.59% 9.966 9.488 9.700 9.222
8+997.80 9.465 7.59% -7.59% 9.957 9.479 9.691 9.213
8+999.20 9.456 7.58% -7.58% 9.948 9.470 9.682 9.204
9+000.60 9.447 7.58% -7.58% 9.938 9.461 9.673 9.196
9+002.00 9.438 7.57% -7.57% 9.929 9.452 9.664 9.187
9+003.40 9.429 7.57% -7.57% 9.920 9.443 9.655 9.178
9+004.80 9.419 7.56% -7.56% 9.909 9.433 9.645 9.169
9+006.20 9.410 7.56% -7.56% 9.900 9.424 9.636 9.160
9+007.60 9.401 7.55% -7.55% 9.891 9.415 9.627 9.151
9+009.00 9.392 7.54% -7.54% 9.882 9.406 9.618 9.142
9+010.40 9.383 7.54% -7.54% 9.872 9.397 9.609 9.134
9+011.80 9.374 7.53% -7.53% 9.863 9.389 9.599 9.125
9+013.20 9.365 7.53% -7.53% 9.854 9.380 9.590 9.116
9+014.60 9.356 7.52% -7.52% 9.845 9.371 9.581 9.107
9+016.00 9.347 7.52% -7.52% 9.835 9.362 9.572 9.099
9+017.40 9.338 7.51% -7.51% 9.826 9.353 9.563 9.090
9+018.80 9.329 7.51% -7.51% 9.817 9.344 9.554 9.081
9+020.20 9.320 7.50% -7.50% 9.808 9.335 9.545 9.072
9+021.60 9.311 7.50% -7.50% 9.798 9.326 9.536 9.064
9+023.00 9.302 7.49% -7.49% 9.789 9.317 9.527 9.055
9+024.40 9.293 7.49% -7.49% 9.780 9.308 9.518 9.046
9+025.80 9.284 7.48% -7.48% 9.771 9.299 9.509 9.037
9+027.20 9.275 7.47% -7.47% 9.761 9.290 9.500 9.029
9+028.60 9.266 7.47% -7.47% 9.752 9.281 9.491 9.020

215 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+030.00 9.257 7.46% -7.46% 9.743 9.273 9.481 9.011


9+031.40 9.248 7.46% -7.46% 9.733 9.264 9.472 9.003
9+032.80 9.239 7.45% -7.45% 9.724 9.255 9.463 8.994
9+034.20 9.230 7.45% -7.45% 9.715 9.246 9.454 8.985
9+035.60 9.221 7.44% -7.44% 9.706 9.237 9.445 8.976
9+037.00 9.212 7.44% -7.44% 9.696 9.228 9.436 8.968
9+038.40 9.203 7.43% -7.43% 9.687 9.219 9.427 8.959
9+039.80 9.194 7.43% -7.43% 9.678 9.210 9.418 8.950
9+041.20 9.185 7.42% -7.42% 9.669 9.201 9.409 8.941
9+042.60 9.176 7.41% -7.41% 9.659 9.192 9.400 8.933
9+044.00 9.167 7.41% -7.41% 9.650 9.183 9.391 8.924
9+045.40 9.158 7.40% -7.40% 9.641 9.174 9.382 8.915
9+046.80 9.149 7.40% -7.40% 9.632 9.165 9.373 8.906
9+048.20 9.140 7.40% -7.40% 9.623 9.156 9.364 8.897
9+049.60 9.131 7.40% -7.40% 9.614 9.147 9.355 8.888
9+051.00 9.122 7.40% -7.40% 9.605 9.138 9.346 8.879
9+052.40 9.113 7.40% -7.40% 9.596 9.129 9.337 8.870
9+053.80 9.104 7.40% -7.40% 9.587 9.120 9.328 8.861
9+055.20 9.095 7.40% -7.40% 9.578 9.111 9.319 8.852
9+056.60 9.086 7.40% -7.40% 9.569 9.102 9.310 8.843
9+058.00 9.077 7.40% -7.40% 9.560 9.093 9.301 8.834
9+059.40 9.068 7.40% -7.40% 9.551 9.084 9.292 8.825
9+060.80 9.059 7.40% -7.40% 9.542 9.075 9.283 8.816
9+062.20 9.050 7.40% -7.40% 9.533 9.066 9.274 8.807
9+063.60 9.041 7.40% -7.40% 9.524 9.057 9.265 8.798
9+065.00 9.032 7.40% -7.40% 9.515 9.048 9.256 8.789
9+066.40 9.023 7.40% -7.40% 9.506 9.039 9.247 8.780
9+067.80 9.014 7.40% -7.40% 9.497 9.030 9.238 8.771
9+069.20 9.005 7.40% -7.40% 9.488 9.021 9.229 8.762
9+070.60 8.996 7.40% -7.40% 9.479 9.012 9.220 8.753

216 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+072.00 8.987 7.40% -7.40% 9.470 9.003 9.211 8.744


9+073.40 8.978 7.40% -7.40% 9.461 8.994 9.202 8.735
9+074.80 8.969 7.40% -7.40% 9.452 8.985 9.193 8.726
9+076.20 8.960 7.40% -7.40% 9.443 8.976 9.184 8.717
9+077.60 8.951 7.40% -7.40% 9.434 8.967 9.175 8.708
9+079.00 8.942 7.40% -7.40% 9.425 8.958 9.166 8.699
9+080.40 8.933 7.40% -7.40% 9.416 8.949 9.157 8.690
9+081.80 8.924 7.40% -7.40% 9.407 8.940 9.148 8.681
9+083.20 8.915 7.40% -7.40% 9.398 8.931 9.139 8.672
9+084.60 8.906 7.40% -7.40% 9.389 8.922 9.130 8.663
9+086.00 8.897 7.40% -7.40% 9.380 8.913 9.121 8.654
9+087.40 8.888 7.40% -7.40% 9.371 8.904 9.112 8.645
9+088.80 8.879 7.40% -7.40% 9.362 8.895 9.103 8.636
9+090.20 8.870 7.40% -7.40% 9.353 8.886 9.094 8.627
9+091.60 8.861 7.40% -7.40% 9.344 8.877 9.085 8.618
9+093.00 8.852 7.40% -7.40% 9.335 8.868 9.076 8.609
9+094.40 8.843 7.40% -7.40% 9.326 8.859 9.067 8.600
9+095.80 8.833 7.40% -7.40% 9.316 8.849 9.057 8.590
9+097.20 8.824 7.40% -7.40% 9.307 8.840 9.048 8.581
9+098.60 8.815 7.40% -7.40% 9.298 8.831 9.039 8.572
9+100.00 8.806 7.40% -7.40% 9.289 8.822 9.030 8.563
9+101.40 8.797 7.40% -7.40% 9.280 8.813 9.021 8.554
9+102.80 8.788 7.40% -7.40% 9.271 8.804 9.012 8.545
9+104.20 8.779 7.40% -7.40% 9.262 8.795 9.003 8.536
9+105.60 8.770 7.40% -7.40% 9.253 8.786 8.994 8.527
9+107.00 8.761 7.40% -7.40% 9.244 8.777 8.985 8.518
9+108.40 8.752 7.40% -7.40% 9.235 8.768 8.976 8.509
9+109.80 8.743 7.40% -7.40% 9.226 8.759 8.967 8.500
9+111.20 8.734 7.40% -7.40% 9.217 8.750 8.958 8.491
9+112.60 8.725 7.40% -7.40% 9.208 8.741 8.949 8.482

217 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+114.00 8.716 7.40% -7.40% 9.199 8.732 8.940 8.473


9+115.40 8.707 7.40% -7.40% 9.190 8.723 8.931 8.464
9+116.80 8.698 7.40% -7.40% 9.181 8.714 8.922 8.455
9+118.20 8.689 7.40% -7.40% 9.172 8.705 8.913 8.446
9+119.60 8.680 7.40% -7.40% 9.163 8.696 8.904 8.437
9+121.00 8.671 7.40% -7.40% 9.154 8.687 8.895 8.428
9+122.40 8.662 7.40% -7.40% 9.145 8.678 8.886 8.419
9+123.80 8.653 7.40% -7.40% 9.136 8.669 8.877 8.410
9+125.20 8.644 7.40% -7.40% 9.127 8.660 8.868 8.401
9+126.60 8.635 7.40% -7.40% 9.118 8.651 8.859 8.392
9+128.00 8.626 7.40% -7.40% 9.109 8.642 8.850 8.383
9+129.40 8.617 7.40% -7.40% 9.100 8.633 8.841 8.374
9+130.80 8.608 7.40% -7.40% 9.091 8.624 8.832 8.365
9+132.20 8.599 7.40% -7.40% 9.082 8.615 8.823 8.356
9+133.60 8.590 7.40% -7.40% 9.073 8.606 8.814 8.347
9+135.00 8.581 7.40% -7.40% 9.064 8.597 8.805 8.338
9+136.40 8.572 7.40% -7.40% 9.055 8.588 8.796 8.329
9+137.80 8.563 7.40% -7.40% 9.046 8.579 8.787 8.320
9+139.20 8.554 7.40% -7.40% 9.037 8.570 8.778 8.311
9+140.60 8.545 7.40% -7.40% 9.028 8.561 8.769 8.302
9+142.00 8.536 7.40% -7.40% 9.019 8.552 8.760 8.293
9+143.40 8.527 7.40% -7.40% 9.010 8.543 8.751 8.284
9+144.80 8.518 7.40% -7.40% 9.001 8.534 8.742 8.275
9+146.20 8.509 7.40% -7.40% 8.992 8.525 8.733 8.266
9+147.60 8.500 7.40% -7.40% 8.983 8.516 8.724 8.257
9+149.00 8.491 7.40% -7.40% 8.974 8.507 8.715 8.248
9+150.40 8.482 7.40% -7.40% 8.965 8.498 8.706 8.239
9+151.80 8.473 7.40% -7.40% 8.956 8.489 8.697 8.230
9+153.20 8.464 7.40% -7.40% 8.947 8.480 8.688 8.221
9+154.60 8.455 7.40% -7.40% 8.938 8.471 8.679 8.212

218 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+156.00 8.446 7.40% -7.40% 8.929 8.462 8.670 8.203


9+157.40 8.437 7.40% -7.40% 8.920 8.453 8.661 8.194
9+158.80 8.428 7.40% -7.40% 8.911 8.444 8.652 8.185
9+160.20 8.419 7.40% -7.40% 8.902 8.435 8.643 8.176
9+161.60 8.410 7.40% -7.40% 8.893 8.426 8.634 8.167
9+163.00 8.401 7.40% -7.40% 8.884 8.417 8.625 8.158
9+164.40 8.392 7.40% -7.40% 8.875 8.408 8.616 8.149
9+165.80 8.383 7.40% -7.40% 8.866 8.399 8.607 8.140
9+167.20 8.375 7.40% -7.40% 8.858 8.391 8.599 8.132
9+168.60 8.366 7.40% -7.40% 8.849 8.382 8.590 8.123
9+170.00 8.358 7.40% -7.40% 8.841 8.374 8.582 8.115
9+171.40 8.349 7.40% -7.40% 8.832 8.365 8.573 8.106
9+172.80 8.341 7.40% -7.40% 8.824 8.357 8.565 8.098
9+174.20 8.333 7.40% -7.40% 8.816 8.349 8.557 8.090
9+175.60 8.325 7.40% -7.40% 8.808 8.341 8.549 8.082
9+177.00 8.317 7.40% -7.40% 8.800 8.333 8.541 8.074
9+178.40 8.309 7.40% -7.40% 8.792 8.325 8.533 8.066
9+179.80 8.301 7.40% -7.40% 8.784 8.317 8.525 8.058
9+181.20 8.293 7.40% -7.40% 8.776 8.309 8.517 8.050
9+182.60 8.285 7.40% -7.40% 8.768 8.301 8.509 8.042
9+184.00 8.277 7.40% -7.40% 8.760 8.293 8.501 8.034
9+185.40 8.270 7.40% -7.40% 8.753 8.286 8.494 8.027
9+186.80 8.262 7.40% -7.40% 8.745 8.278 8.486 8.019
9+188.20 8.255 7.40% -7.40% 8.738 8.271 8.479 8.012
9+189.60 8.248 7.40% -7.40% 8.731 8.264 8.472 8.005
9+191.00 8.240 7.40% -7.40% 8.723 8.256 8.464 7.997
9+192.40 8.233 7.40% -7.40% 8.716 8.249 8.457 7.990
9+193.80 8.226 7.40% -7.40% 8.709 8.242 8.450 7.983
9+195.20 8.219 7.40% -7.40% 8.702 8.235 8.443 7.976
9+196.60 8.212 7.40% -7.40% 8.695 8.228 8.436 7.969

219 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+198.00 8.205 7.40% -7.40% 8.688 8.221 8.429 7.962


9+199.40 8.199 7.40% -7.40% 8.682 8.215 8.423 7.956
9+200.80 8.192 7.40% -7.40% 8.675 8.208 8.416 7.949
9+202.20 8.185 7.40% -7.40% 8.668 8.201 8.409 7.942
9+203.60 8.179 7.40% -7.40% 8.662 8.195 8.403 7.936
9+205.00 8.172 7.40% -7.40% 8.655 8.188 8.396 7.929
9+206.40 8.166 7.40% -7.40% 8.649 8.182 8.390 7.923
9+207.80 8.160 7.40% -7.40% 8.643 8.176 8.384 7.917
9+209.20 8.154 7.40% -7.40% 8.637 8.170 8.378 7.911
9+210.60 8.148 7.38% -7.38% 8.630 8.165 8.371 7.906
9+212.00 8.141 7.20% -7.20% 8.614 8.160 8.362 7.908
9+213.40 8.136 7.02% -7.02% 8.600 8.158 8.354 7.912
9+214.80 8.130 6.84% -6.84% 8.585 8.154 8.346 7.915
9+216.20 8.124 6.66% -6.66% 8.571 8.151 8.337 7.917
9+217.60 8.118 6.49% -6.49% 8.556 8.147 8.329 7.920
9+219.00 8.113 6.31% -6.31% 8.542 8.145 8.321 7.924
9+220.40 8.107 6.13% -6.13% 8.527 8.141 8.313 7.927
9+221.80 8.102 5.95% -5.95% 8.514 8.139 8.305 7.930
9+223.20 8.096 5.77% -5.77% 8.499 8.135 8.297 7.933
9+224.60 8.091 5.59% -5.59% 8.485 8.133 8.289 7.937
9+226.00 8.086 5.41% -5.41% 8.471 8.130 8.282 7.941
9+227.40 8.081 5.24% -5.24% 8.458 8.128 8.274 7.944
9+228.80 8.076 5.06% -5.06% 8.444 8.125 8.267 7.948
9+230.20 8.071 4.88% -4.88% 8.430 8.123 8.259 7.952
9+231.60 8.066 4.70% -4.70% 8.416 8.120 8.252 7.956
9+233.00 8.061 4.52% -4.52% 8.403 8.118 8.244 7.959
9+234.40 8.056 4.34% -4.34% 8.389 8.115 8.237 7.963
9+235.80 8.052 4.16% -4.16% 8.376 8.114 8.230 7.968
9+237.20 8.047 3.99% -3.99% 8.362 8.111 8.223 7.972
9+238.60 8.043 3.81% -3.81% 8.350 8.110 8.216 7.976

220 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+240.00 8.038 3.63% -3.63% 8.336 8.107 8.209 7.980


9+241.40 8.034 3.45% -3.45% 8.323 8.106 8.202 7.985
9+242.80 8.030 3.27% -3.27% 8.310 8.104 8.196 7.990
9+244.20 8.025 3.09% -3.09% 8.297 8.102 8.188 7.993
9+245.60 8.021 2.91% -2.91% 8.284 8.100 8.182 7.998
9+247.00 8.017 2.74% -2.74% 8.271 8.099 8.175 8.003
9+248.40 8.014 2.56% -2.56% 8.259 8.098 8.170 8.009
9+249.80 8.010 2.38% -2.38% 8.247 8.097 8.163 8.013
9+251.20 8.006 2.20% -2.20% 8.234 8.095 8.157 8.018
9+252.60 8.002 2.02% -2.02% 8.221 8.094 8.150 8.023
9+254.00 7.999 1.84% -1.84% 8.209 8.093 8.145 8.029
9+255.40 7.995 1.66% -1.66% 8.197 8.092 8.138 8.033
9+256.80 7.992 1.49% -1.49% 8.185 8.091 8.133 8.039
9+258.20 7.989 1.31% -1.31% 8.173 8.091 8.127 8.045
9+259.60 7.985 1.13% -1.13% 8.160 8.089 8.121 8.050
9+261.00 7.982 0.95% -0.95% 8.149 8.089 8.115 8.055
9+262.40 7.979 0.77% -0.77% 8.137 8.088 8.110 8.061
9+263.80 7.976 0.59% -0.59% 8.125 8.088 8.104 8.067
9+265.20 7.973 0.41% -0.41% 8.113 8.087 8.099 8.073
9+266.60 7.970 0.24% -0.24% 8.102 8.087 8.093 8.078
9+268.00 7.967 0.06% -0.06% 8.090 8.086 8.088 8.084
9+269.40 7.965 -0.12% 0.12% 8.079 8.087 8.083 8.091
9+270.80 7.962 -0.30% 0.30% 8.067 8.086 8.078 8.097
9+272.20 7.960 -0.48% 0.48% 8.057 8.087 8.073 8.103
9+273.60 7.957 -0.66% 0.66% 8.045 8.086 8.068 8.109
9+275.00 7.955 -0.84% 0.84% 8.034 8.087 8.063 8.116
9+276.40 7.953 -1.01% 1.01% 8.023 8.087 8.059 8.123
9+277.80 7.950 -1.19% 1.19% 8.012 8.087 8.053 8.128
9+279.20 7.948 -1.37% 1.37% 8.001 8.087 8.049 8.135
9+280.60 7.946 -1.55% 1.55% 7.990 8.088 8.044 8.142

221 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+282.00 7.944 -1.73% 1.73% 7.979 8.088 8.040 8.149


9+283.40 7.943 -1.91% 1.91% 7.970 8.090 8.036 8.156
9+284.80 7.941 -2.09% 2.09% 7.959 8.090 8.032 8.163
9+286.20 7.939 -2.26% 2.26% 7.948 8.091 8.027 8.170
9+287.60 7.937 -2.44% 2.44% 7.937 8.091 8.023 8.177
9+289.00 7.936 -2.62% 2.62% 7.928 8.093 8.019 8.184
9+290.40 7.934 -2.80% 2.80% 7.917 8.093 8.015 8.191
9+291.80 7.933 -2.98% 2.98% 7.907 8.095 8.011 8.199
9+293.20 7.932 -3.16% 3.16% 7.897 8.096 8.008 8.207
9+294.60 7.930 -3.34% 3.34% 7.887 8.097 8.003 8.213
9+296.00 7.929 -3.51% 3.51% 7.877 8.098 8.000 8.221
9+297.40 7.927 -3.69% 3.69% 7.866 8.099 7.995 8.228
9+298.80 7.926 -3.87% 3.87% 7.856 8.100 7.992 8.236
9+300.20 7.924 -4.05% 4.05% 7.846 8.101 7.987 8.242
9+301.60 7.923 -4.23% 4.23% 7.836 8.102 7.984 8.250
9+303.00 7.922 -4.41% 4.41% 7.826 8.104 7.980 8.258
9+304.40 7.920 -4.59% 4.59% 7.815 8.104 7.976 8.265
9+305.80 7.919 -4.76% 4.76% 7.806 8.106 7.972 8.272
9+307.20 7.917 -4.94% 4.94% 7.795 8.106 7.968 8.279
9+308.60 7.916 -5.12% 5.12% 7.785 8.108 7.964 8.287
9+310.00 7.914 -5.30% 5.30% 7.774 8.108 7.960 8.294
9+311.40 7.913 -5.48% 5.48% 7.765 8.110 7.956 8.301
9+312.80 7.911 -5.66% 5.66% 7.754 8.110 7.952 8.308
9+314.20 7.910 -5.84% 5.84% 7.744 8.112 7.948 8.316
9+315.60 7.909 -6.01% 6.01% 7.734 8.113 7.945 8.324
9+317.00 7.907 -6.19% 6.19% 7.724 8.114 7.940 8.330
9+318.40 7.906 -6.37% 6.37% 7.714 8.115 7.937 8.338
9+319.80 7.904 -6.55% 6.55% 7.703 8.116 7.932 8.345
9+321.20 7.903 -6.73% 6.73% 7.693 8.117 7.929 8.353
9+322.60 7.901 -6.80% 6.80% 7.688 8.116 7.926 8.354

222 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+324.00 7.900 -6.80% 6.80% 7.687 8.115 7.925 8.353


9+325.40 7.898 -6.80% 6.80% 7.685 8.113 7.923 8.351
9+326.80 7.897 -6.80% 6.80% 7.684 8.112 7.922 8.350
9+328.20 7.896 -6.80% 6.80% 7.683 8.111 7.921 8.349
9+329.60 7.894 -6.80% 6.80% 7.681 8.109 7.919 8.347
9+331.00 7.893 -6.80% 6.80% 7.680 8.108 7.918 8.346
9+332.40 7.891 -6.80% 6.80% 7.678 8.106 7.916 8.344
9+333.80 7.890 -6.80% 6.80% 7.677 8.105 7.915 8.343
9+335.20 7.888 -6.80% 6.80% 7.675 8.103 7.913 8.341
9+336.60 7.887 -6.80% 6.80% 7.674 8.102 7.912 8.340
9+338.00 7.885 -6.80% 6.80% 7.672 8.100 7.910 8.338
9+339.40 7.884 -6.80% 6.80% 7.671 8.099 7.909 8.337
9+340.80 7.883 -6.80% 6.80% 7.670 8.098 7.908 8.336
9+342.20 7.881 -6.80% 6.80% 7.668 8.096 7.906 8.334
9+343.60 7.880 -6.80% 6.80% 7.667 8.095 7.905 8.333
9+345.00 7.878 -6.80% 6.80% 7.665 8.093 7.903 8.331
9+346.40 7.877 -6.80% 6.80% 7.664 8.092 7.902 8.330
9+347.80 7.875 -6.80% 6.80% 7.662 8.090 7.900 8.328
9+349.20 7.874 -6.80% 6.80% 7.661 8.089 7.899 8.327
9+350.60 7.873 -6.80% 6.80% 7.660 8.088 7.898 8.326
9+352.00 7.871 -6.80% 6.80% 7.658 8.086 7.896 8.324
9+353.40 7.870 -6.80% 6.80% 7.657 8.085 7.895 8.323
9+354.80 7.868 -6.80% 6.80% 7.655 8.083 7.893 8.321
9+356.20 7.867 -6.80% 6.80% 7.654 8.082 7.892 8.320
9+357.60 7.865 -6.80% 6.80% 7.652 8.080 7.890 8.318
9+359.00 7.864 -6.80% 6.80% 7.651 8.079 7.889 8.317
9+360.40 7.862 -6.80% 6.80% 7.649 8.077 7.887 8.315
9+361.80 7.861 -6.80% 6.80% 7.648 8.076 7.886 8.314
9+363.20 7.860 -6.80% 6.80% 7.647 8.075 7.885 8.313
9+364.60 7.858 -6.80% 6.80% 7.645 8.073 7.883 8.311

223 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+366.00 7.857 -6.80% 6.80% 7.644 8.072 7.882 8.310


9+367.40 7.855 -6.80% 6.80% 7.642 8.070 7.880 8.308
9+368.80 7.854 -6.80% 6.80% 7.641 8.069 7.879 8.307
9+370.20 7.852 -6.80% 6.80% 7.639 8.067 7.877 8.305
9+371.60 7.851 -6.80% 6.80% 7.638 8.066 7.876 8.304
9+373.00 7.849 -6.80% 6.80% 7.636 8.064 7.874 8.302
9+374.40 7.848 -6.80% 6.80% 7.635 8.063 7.873 8.301
9+375.80 7.847 -6.80% 6.80% 7.634 8.062 7.872 8.300
9+377.20 7.845 -6.80% 6.80% 7.632 8.060 7.870 8.298
9+378.60 7.844 -6.80% 6.80% 7.631 8.059 7.869 8.297
9+380.00 7.842 -6.80% 6.80% 7.629 8.057 7.867 8.295
9+381.40 7.841 -6.80% 6.80% 7.628 8.056 7.866 8.294
9+382.80 7.839 -6.80% 6.80% 7.626 8.054 7.864 8.292
9+384.20 7.838 -6.80% 6.80% 7.625 8.053 7.863 8.291
9+385.60 7.836 -6.80% 6.80% 7.623 8.051 7.861 8.289
9+387.00 7.835 -6.80% 6.80% 7.622 8.050 7.860 8.288
9+388.40 7.834 -6.80% 6.80% 7.621 8.049 7.859 8.287
9+389.80 7.832 -6.80% 6.80% 7.619 8.047 7.857 8.285
9+391.20 7.831 -6.80% 6.80% 7.618 8.046 7.856 8.284
9+392.60 7.829 -6.80% 6.80% 7.616 8.044 7.854 8.282
9+394.00 7.828 -6.80% 6.80% 7.615 8.043 7.853 8.281
9+395.40 7.826 -6.80% 6.80% 7.613 8.041 7.851 8.279
9+396.80 7.825 -6.80% 6.80% 7.612 8.040 7.850 8.278
9+398.20 7.824 -6.80% 6.80% 7.611 8.039 7.849 8.277
9+399.60 7.822 -6.80% 6.80% 7.609 8.037 7.847 8.275
9+401.00 7.821 -6.80% 6.80% 7.608 8.036 7.846 8.274
9+402.40 7.819 -6.64% 6.64% 7.614 8.032 7.846 8.264
9+403.80 7.818 -6.42% 6.42% 7.623 8.028 7.848 8.253
9+405.20 7.816 -6.21% 6.21% 7.632 8.023 7.849 8.240
9+406.60 7.815 -6.00% 6.00% 7.641 8.019 7.851 8.229

224 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+408.00 7.813 -5.79% 5.79% 7.649 8.014 7.852 8.217


9+409.40 7.812 -5.58% 5.58% 7.659 8.010 7.854 8.205
9+410.80 7.811 -5.37% 5.37% 7.668 8.006 7.856 8.194
9+412.20 7.809 -5.15% 5.15% 7.676 8.001 7.857 8.182
9+413.60 7.808 -4.94% 4.94% 7.686 7.997 7.859 8.170
9+415.00 7.806 -4.73% 4.73% 7.694 7.992 7.860 8.158
9+416.40 7.805 -4.52% 4.52% 7.704 7.988 7.862 8.146
9+417.80 7.803 -4.31% 4.31% 7.712 7.983 7.863 8.134
9+419.20 7.802 -4.10% 4.10% 7.721 7.979 7.865 8.123
9+420.60 7.800 -3.89% 3.89% 7.730 7.974 7.866 8.110
9+422.00 7.799 -3.67% 3.67% 7.739 7.970 7.868 8.099
9+423.40 7.798 -3.46% 3.46% 7.748 7.966 7.870 8.088
9+424.80 7.796 -3.25% 3.25% 7.757 7.962 7.870 8.075
9+426.20 7.795 -3.04% 3.04% 7.766 7.958 7.872 8.064
9+427.60 7.793 -3.00% 2.83% 7.766 7.955 7.873 8.052
9+429.00 7.792 -3.00% 2.62% 7.765 7.954 7.875 8.040
9+430.40 7.790 -3.00% 2.40% 7.763 7.952 7.876 8.028
9+431.80 7.789 -3.00% 2.19% 7.762 7.951 7.878 8.016
9+433.20 7.787 -3.00% 1.98% 7.760 7.949 7.879 8.004
9+434.60 7.786 -3.00% 1.77% 7.759 7.948 7.881 7.993
9+436.00 7.785 -3.00% 1.56% 7.758 7.947 7.883 7.981
9+437.40 7.783 -3.00% 1.35% 7.756 7.945 7.884 7.969
9+438.80 7.782 -3.00% 1.14% 7.755 7.944 7.886 7.958
9+440.20 7.780 -3.00% 0.92% 7.753 7.942 7.887 7.945
9+441.60 7.779 -3.00% 0.71% 7.752 7.941 7.889 7.934
9+443.00 7.777 -3.00% 0.50% 7.750 7.939 7.890 7.922
9+444.40 7.776 -3.00% 0.29% 7.749 7.938 7.892 7.910
9+445.80 7.775 -3.00% 0.08% 7.748 7.937 7.894 7.899
9+447.20 7.773 -3.00% -0.13% 7.746 7.935 7.895 7.886
9+448.60 7.772 -3.00% -0.35% 7.745 7.934 7.897 7.875

225 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+450.00 7.770 -3.00% -0.56% 7.743 7.932 7.898 7.863


9+451.40 7.769 -3.00% -0.77% 7.742 7.931 7.900 7.851
9+452.80 7.767 -3.00% -0.98% 7.740 7.929 7.901 7.839
9+454.20 7.766 -3.00% -1.19% 7.739 7.928 7.903 7.828
9+455.60 7.764 -3.00% -1.40% 7.737 7.926 7.904 7.815
9+457.00 7.763 -3.00% -1.61% 7.736 7.925 7.906 7.804
9+458.40 7.762 -3.00% -1.83% 7.735 7.924 7.908 7.793
9+459.80 7.760 -3.00% -2.04% 7.733 7.922 7.909 7.780
9+461.20 7.759 -3.00% -2.25% 7.732 7.921 7.910 7.769
9+462.60 7.757 -3.00% -2.46% 7.730 7.919 7.911 7.756
9+464.00 7.756 -3.00% -2.67% 7.729 7.918 7.913 7.745
9+465.40 7.754 -3.00% -2.88% 7.727 7.916 7.914 7.733
9+466.80 7.753 -3.00% -3.00% 7.726 7.915 7.915 7.726
9+468.20 7.751 -3.00% -3.00% 7.724 7.913 7.913 7.724
9+469.60 7.750 -3.00% -3.00% 7.723 7.912 7.912 7.723
9+471.00 7.749 -3.00% -3.00% 7.722 7.911 7.911 7.722
9+472.40 7.747 -3.00% -3.00% 7.720 7.909 7.909 7.720
9+473.80 7.746 -3.00% -3.00% 7.719 7.908 7.908 7.719
9+475.20 7.744 -3.00% -3.00% 7.717 7.906 7.906 7.717
9+476.60 7.743 -3.00% -3.00% 7.716 7.905 7.905 7.716
9+478.00 7.741 -3.00% -3.00% 7.714 7.903 7.903 7.714
9+479.40 7.740 -3.00% -3.00% 7.713 7.902 7.902 7.713
9+480.80 7.739 -3.00% -3.00% 7.712 7.901 7.901 7.712
9+482.20 7.737 -3.00% -3.00% 7.710 7.899 7.899 7.710
9+483.60 7.736 -3.00% -3.00% 7.709 7.898 7.898 7.709
9+485.00 7.734 -3.00% -3.00% 7.707 7.896 7.896 7.707
9+486.40 7.733 -3.00% -3.00% 7.706 7.895 7.895 7.706
9+487.80 7.731 -3.00% -3.00% 7.704 7.893 7.893 7.704
9+489.20 7.730 -3.00% -3.00% 7.703 7.892 7.892 7.703
9+490.60 7.728 -3.00% -3.00% 7.701 7.890 7.890 7.701

226 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+492.00 7.727 -3.00% -3.00% 7.700 7.889 7.889 7.700


9+493.40 7.726 -3.00% -3.00% 7.699 7.888 7.888 7.699
9+494.80 7.724 -3.00% -3.00% 7.697 7.886 7.886 7.697
9+496.20 7.723 -3.00% -3.00% 7.696 7.885 7.885 7.696
9+497.60 7.721 -3.00% -3.00% 7.694 7.883 7.883 7.694
9+499.00 7.720 -3.00% -3.00% 7.693 7.882 7.882 7.693
9+500.40 7.718 -3.00% -3.00% 7.691 7.880 7.880 7.691
9+501.80 7.717 -3.00% -3.00% 7.690 7.879 7.879 7.690
9+503.20 7.715 -3.00% -3.00% 7.688 7.877 7.877 7.688
9+504.60 7.714 -3.00% -3.00% 7.687 7.876 7.876 7.687
9+506.00 7.713 -3.00% -3.00% 7.686 7.875 7.875 7.686
9+507.40 7.711 -3.00% -3.00% 7.684 7.873 7.873 7.684
9+508.80 7.710 -3.00% -3.00% 7.683 7.872 7.872 7.683
9+510.20 7.708 -3.00% -2.80% 7.681 7.870 7.867 7.691
9+511.60 7.707 -3.00% -2.59% 7.680 7.869 7.863 7.700
9+513.00 7.705 -3.00% -2.39% 7.678 7.867 7.858 7.708
9+514.40 7.704 -3.00% -2.19% 7.677 7.866 7.855 7.717
9+515.80 7.702 -3.00% -1.98% 7.675 7.864 7.850 7.725
9+517.20 7.701 -3.00% -1.78% 7.674 7.863 7.846 7.734
9+518.60 7.700 -3.00% -1.58% 7.673 7.862 7.842 7.743
9+520.00 7.698 -3.00% -1.37% 7.671 7.860 7.837 7.751
9+521.40 7.697 -3.00% -1.17% 7.670 7.859 7.833 7.760
9+522.80 7.695 -3.00% -0.97% 7.668 7.857 7.829 7.768
9+524.20 7.694 -3.00% -0.76% 7.667 7.856 7.825 7.777
9+525.60 7.692 -3.00% -0.56% 7.665 7.854 7.820 7.785
9+527.00 7.691 -3.00% -0.36% 7.664 7.853 7.816 7.794
9+528.40 7.690 -3.00% -0.15% 7.663 7.852 7.812 7.802
9+529.80 7.688 -3.00% 0.05% 7.661 7.850 7.807 7.810
9+531.20 7.687 -3.00% 0.25% 7.660 7.849 7.803 7.819
9+532.60 7.685 -3.00% 0.46% 7.658 7.847 7.799 7.827

227 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+534.00 7.684 -3.00% 0.66% 7.657 7.846 7.795 7.836


9+535.40 7.682 -3.00% 0.86% 7.655 7.844 7.790 7.844
9+536.80 7.681 -3.00% 1.07% 7.654 7.843 7.786 7.853
9+538.20 7.679 -3.00% 1.27% 7.652 7.841 7.781 7.861
9+539.60 7.678 -3.00% 1.47% 7.651 7.840 7.777 7.870
9+541.00 7.677 -3.00% 1.68% 7.650 7.839 7.774 7.879
9+542.40 7.675 -3.00% 1.88% 7.648 7.837 7.769 7.887
9+543.80 7.674 -3.00% 2.08% 7.647 7.836 7.765 7.896
9+545.20 7.672 -3.00% 2.29% 7.645 7.834 7.760 7.904
9+546.60 7.672 -3.00% 2.49% 7.645 7.834 7.757 7.914
9+548.00 7.672 -3.00% 2.69% 7.645 7.834 7.754 7.924
9+549.40 7.674 -3.00% 2.90% 7.647 7.836 7.753 7.936
9+550.80 7.676 -3.17% 3.10% 7.641 7.840 7.753 7.948
9+552.20 7.679 -3.37% 3.30% 7.634 7.846 7.753 7.961
9+553.60 7.682 -3.57% 3.51% 7.627 7.852 7.753 7.974
9+555.00 7.687 -3.77% 3.71% 7.622 7.860 7.755 7.989
9+556.40 7.693 -3.97% 3.92% 7.619 7.869 7.758 8.005
9+557.80 7.699 -4.17% 4.12% 7.615 7.877 7.761 8.021
9+559.20 7.706 -4.37% 4.32% 7.612 7.887 7.765 8.038
9+560.60 7.714 -4.57% 4.53% 7.610 7.898 7.771 8.056
9+562.00 7.723 -4.76% 4.73% 7.610 7.910 7.777 8.075
9+563.40 7.733 -4.96% 4.93% 7.610 7.922 7.784 8.095
9+564.80 7.744 -5.16% 5.14% 7.611 7.936 7.792 8.116
9+566.20 7.755 -5.36% 5.34% 7.612 7.950 7.800 8.137
9+567.60 7.767 -5.56% 5.54% 7.615 7.965 7.809 8.159
9+569.00 7.781 -5.76% 5.75% 7.619 7.982 7.821 8.183
9+570.40 7.795 -5.96% 5.95% 7.623 7.998 7.832 8.207
9+571.80 7.810 -6.16% 6.15% 7.628 8.016 7.844 8.231
9+573.20 7.825 -6.36% 6.36% 7.633 8.034 7.856 8.256
9+574.60 7.842 -6.40% 6.40% 7.648 8.052 7.872 8.276

228 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+576.00 7.859 -6.40% 6.40% 7.665 8.069 7.889 8.293


9+577.40 7.878 -6.40% 6.40% 7.684 8.088 7.908 8.312
9+578.80 7.897 -6.40% 6.40% 7.703 8.107 7.927 8.331
9+580.20 7.917 -6.40% 6.40% 7.723 8.127 7.947 8.351
9+581.60 7.938 -6.40% 6.40% 7.744 8.148 7.968 8.372
9+583.00 7.959 -6.40% 6.40% 7.765 8.169 7.989 8.393
9+584.40 7.982 -6.40% 6.40% 7.788 8.192 8.012 8.416
9+585.80 8.005 -6.40% 6.40% 7.811 8.215 8.035 8.439
9+587.20 8.030 -6.40% 6.40% 7.836 8.240 8.060 8.464
9+588.60 8.055 -6.40% 6.40% 7.861 8.265 8.085 8.489
9+590.00 8.081 -6.40% 6.40% 7.887 8.291 8.111 8.515
9+591.40 8.108 -6.40% 6.40% 7.914 8.318 8.138 8.542
9+592.80 8.135 -6.40% 6.40% 7.941 8.345 8.165 8.569
9+594.20 8.164 -6.40% 6.40% 7.970 8.374 8.194 8.598
9+595.60 8.193 -6.40% 6.40% 7.999 8.403 8.223 8.627
9+597.00 8.223 -6.40% 6.40% 8.029 8.433 8.253 8.657
9+598.40 8.254 -6.40% 6.40% 8.060 8.464 8.284 8.688
9+599.80 8.286 -6.40% 6.40% 8.092 8.496 8.316 8.720
9+601.20 8.319 -6.40% 6.40% 8.125 8.529 8.349 8.753
9+602.60 8.353 -6.40% 6.40% 8.159 8.563 8.383 8.787
9+604.00 8.387 -6.40% 6.40% 8.193 8.597 8.417 8.821
9+605.40 8.423 -6.40% 6.40% 8.229 8.633 8.453 8.857
9+606.80 8.459 -6.40% 6.40% 8.265 8.669 8.489 8.893
9+608.20 8.496 -6.40% 6.40% 8.302 8.706 8.526 8.930
9+609.60 8.534 -6.40% 6.40% 8.340 8.744 8.564 8.968
9+611.00 8.573 -6.40% 6.40% 8.379 8.783 8.603 9.007
9+612.40 8.612 -6.40% 6.40% 8.418 8.822 8.642 9.046
9+613.80 8.653 -6.40% 6.40% 8.459 8.863 8.683 9.087
9+615.20 8.694 -6.40% 6.40% 8.500 8.904 8.724 9.128
9+616.60 8.736 -6.40% 6.40% 8.542 8.946 8.766 9.170

229 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+618.00 8.779 -6.40% 6.40% 8.585 8.989 8.809 9.213


9+619.40 8.823 -6.40% 6.40% 8.629 9.033 8.853 9.257
9+620.80 8.868 -6.40% 6.40% 8.674 9.078 8.898 9.302
9+622.20 8.913 -6.40% 6.40% 8.719 9.123 8.943 9.347
9+623.60 8.960 -6.40% 6.40% 8.766 9.170 8.990 9.394
9+625.00 9.007 -6.40% 6.40% 8.813 9.217 9.037 9.441
9+626.40 9.055 -6.40% 6.40% 8.861 9.265 9.085 9.489
9+627.80 9.104 -6.40% 6.40% 8.910 9.314 9.134 9.538
9+629.20 9.154 -6.40% 6.40% 8.960 9.364 9.184 9.588
9+630.60 9.205 -6.40% 6.40% 9.011 9.415 9.235 9.639
9+632.00 9.256 -6.40% 6.40% 9.062 9.466 9.286 9.690
9+633.40 9.308 -6.40% 6.40% 9.114 9.518 9.338 9.742
9+634.80 9.362 -6.40% 6.40% 9.168 9.572 9.392 9.796
9+636.20 9.416 -6.40% 6.40% 9.222 9.626 9.446 9.850
9+637.60 9.471 -6.40% 6.40% 9.277 9.681 9.501 9.905
9+639.00 9.527 -6.40% 6.40% 9.333 9.737 9.557 9.961
9+640.40 9.583 -6.40% 6.40% 9.389 9.793 9.613 10.017
9+641.80 9.641 -6.40% 6.40% 9.447 9.851 9.671 10.075
9+643.20 9.699 -6.40% 6.40% 9.505 9.909 9.729 10.133
9+644.60 9.758 -6.40% 6.40% 9.564 9.968 9.788 10.192
9+646.00 9.818 -6.40% 6.40% 9.624 10.028 9.848 10.252
9+647.40 9.879 -6.40% 6.40% 9.685 10.089 9.909 10.313
9+648.80 9.941 -6.40% 6.40% 9.747 10.151 9.971 10.375
9+650.20 10.004 -6.40% 6.40% 9.810 10.214 10.034 10.438
9+651.60 10.066 -6.40% 6.40% 9.872 10.276 10.096 10.500
9+653.00 10.129 -6.40% 6.40% 9.935 10.339 10.159 10.563
9+654.40 10.192 -6.40% 6.40% 9.998 10.402 10.222 10.626
9+655.80 10.255 -6.40% 6.40% 10.061 10.465 10.285 10.689
9+657.20 10.318 -6.40% 6.40% 10.124 10.528 10.348 10.752
9+658.60 10.381 -6.40% 6.40% 10.187 10.591 10.411 10.815

230 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+660.00 10.443 -6.40% 6.40% 10.249 10.653 10.473 10.877


9+661.40 10.506 -6.40% 6.40% 10.312 10.716 10.536 10.940
9+662.80 10.569 -6.40% 6.40% 10.375 10.779 10.599 11.003
9+664.20 10.632 -6.40% 6.40% 10.438 10.842 10.662 11.066
9+665.60 10.695 -6.40% 6.40% 10.501 10.905 10.725 11.129
9+667.00 10.758 -6.40% 6.40% 10.564 10.968 10.788 11.192
9+668.40 10.820 -6.40% 6.40% 10.626 11.030 10.850 11.254
9+669.80 10.883 -6.40% 6.40% 10.689 11.093 10.913 11.317
9+671.20 10.946 -6.40% 6.40% 10.752 11.156 10.976 11.380
9+672.60 11.009 -6.40% 6.40% 10.815 11.219 11.039 11.443
9+674.00 11.072 -6.40% 6.40% 10.878 11.282 11.102 11.506
9+675.40 11.135 -6.40% 6.40% 10.941 11.345 11.165 11.569
9+676.80 11.197 -6.40% 6.40% 11.003 11.407 11.227 11.631
9+678.20 11.260 -6.40% 6.40% 11.066 11.470 11.290 11.694
9+679.60 11.323 -6.40% 6.40% 11.129 11.533 11.353 11.757
9+681.00 11.386 -6.40% 6.40% 11.192 11.596 11.416 11.820
9+682.40 11.449 -6.40% 6.40% 11.255 11.659 11.479 11.883
9+683.80 11.512 -6.40% 6.40% 11.318 11.722 11.542 11.946
9+685.20 11.575 -6.40% 6.40% 11.381 11.785 11.605 12.009
9+686.60 11.637 -6.40% 6.40% 11.443 11.847 11.667 12.071
9+688.00 11.700 -6.40% 6.40% 11.506 11.910 11.730 12.134
9+689.40 11.763 -6.40% 6.40% 11.569 11.973 11.793 12.197
9+690.80 11.826 -6.40% 6.40% 11.632 12.036 11.856 12.260
9+692.20 11.889 -6.40% 6.40% 11.695 12.099 11.919 12.323
9+693.60 11.952 -6.40% 6.40% 11.758 12.162 11.982 12.386
9+695.00 12.014 -6.40% 6.40% 11.820 12.224 12.044 12.448
9+696.40 12.077 -6.40% 6.40% 11.883 12.287 12.107 12.511
9+697.80 12.140 -6.40% 6.40% 11.946 12.350 12.170 12.574
9+699.20 12.203 -6.40% 6.40% 12.009 12.413 12.233 12.637
9+700.60 12.266 -6.40% 6.40% 12.072 12.476 12.296 12.700

231 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+702.00 12.329 -6.40% 6.40% 12.135 12.539 12.359 12.763


9+703.40 12.391 -6.40% 6.40% 12.197 12.601 12.421 12.825
9+704.80 12.454 -6.40% 6.40% 12.260 12.664 12.484 12.888
9+706.20 12.517 -6.40% 6.40% 12.323 12.727 12.547 12.951
9+707.60 12.580 -6.40% 6.40% 12.386 12.790 12.610 13.014
9+709.00 12.643 -6.40% 6.40% 12.449 12.853 12.673 13.077
9+710.40 12.706 -6.40% 6.40% 12.512 12.916 12.736 13.140
9+711.80 12.768 -6.40% 6.40% 12.574 12.978 12.798 13.202
9+713.20 12.831 -6.40% 6.40% 12.637 13.041 12.861 13.265
9+714.60 12.894 -6.40% 6.40% 12.700 13.104 12.924 13.328
9+716.00 12.957 -6.40% 6.40% 12.763 13.167 12.987 13.391
9+717.40 13.020 -6.40% 6.40% 12.826 13.230 13.050 13.454
9+718.80 13.083 -6.40% 6.40% 12.889 13.293 13.113 13.517
9+720.20 13.145 -6.40% 6.40% 12.951 13.355 13.175 13.579
9+721.60 13.208 -6.40% 6.40% 13.014 13.418 13.238 13.642
9+723.00 13.271 -6.40% 6.40% 13.077 13.481 13.301 13.705
9+724.40 13.333 -6.40% 6.40% 13.139 13.543 13.363 13.767
9+725.80 13.394 -6.40% 6.40% 13.200 13.604 13.424 13.828
9+727.20 13.454 -6.40% 6.40% 13.260 13.664 13.484 13.888
9+728.60 13.513 -6.40% 6.40% 13.319 13.723 13.543 13.947
9+730.00 13.570 -6.40% 6.40% 13.376 13.780 13.600 14.004
9+731.40 13.626 -6.40% 6.40% 13.432 13.836 13.656 14.060
9+732.80 13.682 -6.40% 6.40% 13.488 13.892 13.712 14.116
9+734.20 13.736 -6.40% 6.40% 13.542 13.946 13.766 14.170
9+735.60 13.788 -6.40% 6.40% 13.594 13.998 13.818 14.222
9+737.00 13.840 -6.40% 6.40% 13.646 14.050 13.870 14.274
9+738.40 13.891 -6.40% 6.40% 13.697 14.101 13.921 14.325
9+739.80 13.940 -6.40% 6.40% 13.746 14.150 13.970 14.374
9+741.20 13.988 -6.40% 6.40% 13.794 14.198 14.018 14.422
9+742.60 14.035 -6.40% 6.40% 13.841 14.245 14.065 14.469

232 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+744.00 14.081 -6.40% 6.40% 13.887 14.291 14.111 14.515


9+745.40 14.126 -6.40% 6.40% 13.932 14.336 14.156 14.560
9+746.80 14.170 -6.40% 6.40% 13.976 14.380 14.200 14.604
9+748.20 14.212 -6.40% 6.40% 14.018 14.422 14.242 14.646
9+749.60 14.254 -6.40% 6.40% 14.060 14.464 14.284 14.688
9+751.00 14.294 -6.40% 6.40% 14.100 14.504 14.324 14.728
9+752.40 14.333 -6.40% 6.40% 14.139 14.543 14.363 14.767
9+753.80 14.371 -6.40% 6.40% 14.177 14.581 14.401 14.805
9+755.20 14.407 -6.40% 6.40% 14.213 14.617 14.437 14.841
9+756.60 14.443 -6.40% 6.40% 14.249 14.653 14.473 14.877
9+758.00 14.477 -6.40% 6.40% 14.283 14.687 14.507 14.911
9+759.40 14.511 -6.40% 6.40% 14.317 14.721 14.541 14.945
9+760.80 14.543 -6.40% 6.40% 14.349 14.753 14.573 14.977
9+762.20 14.574 -6.40% 6.40% 14.380 14.784 14.604 15.008
9+763.60 14.604 -6.40% 6.40% 14.410 14.814 14.634 15.038
9+765.00 14.632 -6.40% 6.40% 14.438 14.842 14.662 15.066
9+766.40 14.660 -6.40% 6.40% 14.466 14.870 14.690 15.094
9+767.80 14.686 -6.40% 6.40% 14.492 14.896 14.716 15.120
9+769.20 14.711 -6.40% 6.40% 14.517 14.921 14.741 15.145
9+770.60 14.735 -6.40% 6.40% 14.541 14.945 14.765 15.169
9+772.00 14.758 -6.40% 6.40% 14.564 14.968 14.788 15.192
9+773.40 14.780 -6.40% 6.40% 14.586 14.990 14.810 15.214
9+774.80 14.801 -6.40% 6.40% 14.607 15.011 14.831 15.235
9+776.20 14.820 -6.40% 6.40% 14.626 15.030 14.850 15.254
9+777.60 14.838 -6.40% 6.40% 14.644 15.048 14.868 15.272
9+779.00 14.855 -6.40% 6.40% 14.661 15.065 14.885 15.289
9+780.40 14.871 -6.40% 6.40% 14.677 15.081 14.901 15.305
9+781.80 14.886 -6.40% 6.40% 14.692 15.096 14.916 15.320
9+783.20 14.900 -6.40% 6.40% 14.706 15.110 14.930 15.334
9+784.60 14.912 -6.40% 6.40% 14.718 15.122 14.942 15.346

233 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+786.00 14.924 -6.40% 6.40% 14.730 15.134 14.954 15.358


9+787.40 14.934 -6.40% 6.40% 14.740 15.144 14.964 15.368
9+788.80 14.943 -6.40% 6.40% 14.749 15.153 14.973 15.377
9+790.20 14.951 -6.40% 6.40% 14.757 15.161 14.981 15.385
9+791.60 14.958 -6.40% 6.40% 14.764 15.168 14.988 15.392
9+793.00 14.963 -6.40% 6.40% 14.769 15.173 14.993 15.397
9+794.40 14.968 -6.40% 6.40% 14.774 15.178 14.998 15.402
9+795.80 14.971 -6.40% 6.40% 14.777 15.181 15.001 15.405
9+797.20 14.973 -6.40% 6.40% 14.779 15.183 15.003 15.407
9+798.60 14.974 -6.40% 6.40% 14.780 15.184 15.004 15.408
9+800.00 14.974 -6.40% 6.40% 14.780 15.184 15.004 15.408
9+801.40 14.972 -6.40% 6.40% 14.778 15.182 15.002 15.406
9+802.80 14.970 -6.40% 6.40% 14.776 15.180 15.000 15.404
9+804.20 14.966 -6.40% 6.40% 14.772 15.176 14.996 15.400
9+805.60 14.962 -6.40% 6.40% 14.768 15.172 14.992 15.396
9+807.00 14.956 -6.40% 6.40% 14.762 15.166 14.986 15.390
9+808.40 14.949 -6.40% 6.40% 14.755 15.159 14.979 15.383
9+809.80 14.940 -6.40% 6.40% 14.746 15.150 14.970 15.374
9+811.20 14.931 -6.40% 6.40% 14.737 15.141 14.961 15.365
9+812.60 14.920 -6.40% 6.40% 14.726 15.130 14.950 15.354
9+814.00 14.909 -6.40% 6.40% 14.715 15.119 14.939 15.343
9+815.40 14.896 -6.40% 6.40% 14.702 15.106 14.926 15.330
9+816.80 14.882 -6.40% 6.40% 14.688 15.092 14.912 15.316
9+818.20 14.867 -6.40% 6.40% 14.673 15.077 14.897 15.301
9+819.60 14.850 -6.40% 6.40% 14.656 15.060 14.880 15.284
9+821.00 14.833 -6.40% 6.40% 14.639 15.043 14.863 15.267
9+822.40 14.814 -6.40% 6.40% 14.620 15.024 14.844 15.248
9+823.80 14.795 -6.40% 6.40% 14.601 15.005 14.825 15.229
9+825.20 14.774 -6.40% 6.40% 14.580 14.984 14.804 15.208
9+826.60 14.753 -6.40% 6.40% 14.559 14.963 14.783 15.187

234 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+828.00 14.732 -6.40% 6.40% 14.538 14.942 14.762 15.166


9+829.40 14.712 -6.40% 6.40% 14.518 14.922 14.742 15.146
9+830.80 14.691 -6.40% 6.40% 14.497 14.901 14.721 15.125
9+832.20 14.670 -6.40% 6.40% 14.476 14.880 14.700 15.104
9+833.60 14.649 -6.40% 6.40% 14.455 14.859 14.679 15.083
9+835.00 14.629 -6.40% 6.40% 14.435 14.839 14.659 15.063
9+836.40 14.608 -6.40% 6.40% 14.414 14.818 14.638 15.042
9+837.80 14.587 -6.40% 6.40% 14.393 14.797 14.617 15.021
9+839.20 14.566 -6.40% 6.40% 14.372 14.776 14.596 15.000
9+840.60 14.546 -6.40% 6.40% 14.352 14.756 14.576 14.980
9+842.00 14.525 -6.40% 6.40% 14.331 14.735 14.555 14.959
9+843.40 14.504 -6.40% 6.40% 14.310 14.714 14.534 14.938
9+844.80 14.483 -6.40% 6.40% 14.289 14.693 14.513 14.917
9+846.20 14.463 -6.40% 6.40% 14.269 14.673 14.493 14.897
9+847.60 14.442 -6.40% 6.40% 14.248 14.652 14.472 14.876
9+849.00 14.421 -6.40% 6.40% 14.227 14.631 14.451 14.855
9+850.40 14.400 -6.40% 6.40% 14.206 14.610 14.430 14.834
9+851.80 14.380 -6.40% 6.40% 14.186 14.590 14.410 14.814
9+853.20 14.359 -6.40% 6.40% 14.165 14.569 14.389 14.793
9+854.60 14.338 -6.40% 6.40% 14.144 14.548 14.368 14.772
9+856.00 14.317 -6.40% 6.40% 14.123 14.527 14.347 14.751
9+857.40 14.297 -6.40% 6.40% 14.103 14.507 14.327 14.731
9+858.80 14.276 -6.40% 6.40% 14.082 14.486 14.306 14.710
9+860.20 14.255 -6.40% 6.40% 14.061 14.465 14.285 14.689
9+861.60 14.234 -6.40% 6.40% 14.040 14.444 14.264 14.668
9+863.00 14.214 -6.40% 6.40% 14.020 14.424 14.244 14.648
9+864.40 14.193 -6.40% 6.40% 13.999 14.403 14.223 14.627
9+865.80 14.172 -6.40% 6.40% 13.978 14.382 14.202 14.606
9+867.20 14.151 -6.40% 6.40% 13.957 14.361 14.181 14.585
9+868.60 14.131 -6.40% 6.40% 13.937 14.341 14.161 14.565

235 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+870.00 14.110 -6.40% 6.40% 13.916 14.320 14.140 14.544


9+871.40 14.089 -6.40% 6.40% 13.895 14.299 14.119 14.523
9+872.80 14.068 -6.40% 6.40% 13.874 14.278 14.098 14.502
9+874.20 14.048 -6.40% 6.40% 13.854 14.258 14.078 14.482
9+875.60 14.027 -6.40% 6.40% 13.833 14.237 14.057 14.461
9+877.00 14.006 -6.40% 6.40% 13.812 14.216 14.036 14.440
9+878.40 13.985 -6.40% 6.40% 13.791 14.195 14.015 14.419
9+879.80 13.965 -6.40% 6.40% 13.771 14.175 13.995 14.399
9+881.20 13.944 -6.40% 6.40% 13.750 14.154 13.974 14.378
9+882.60 13.923 -6.40% 6.40% 13.729 14.133 13.953 14.357
9+884.00 13.902 -6.40% 6.40% 13.708 14.112 13.932 14.336
9+885.40 13.882 -6.40% 6.40% 13.688 14.092 13.912 14.316
9+886.80 13.861 -6.40% 6.40% 13.667 14.071 13.891 14.295
9+888.20 13.840 -6.40% 6.40% 13.646 14.050 13.870 14.274
9+889.60 13.819 -6.40% 6.40% 13.625 14.029 13.849 14.253
9+891.00 13.799 -6.40% 6.40% 13.605 14.009 13.829 14.233
9+892.40 13.778 -6.40% 6.40% 13.584 13.988 13.808 14.212
9+893.80 13.757 -6.40% 6.40% 13.563 13.967 13.787 14.191
9+895.20 13.736 -6.40% 6.40% 13.542 13.946 13.766 14.170
9+896.60 13.716 -6.40% 6.40% 13.522 13.926 13.746 14.150
9+898.00 13.695 -6.40% 6.40% 13.501 13.905 13.725 14.129
9+899.40 13.674 -6.40% 6.40% 13.480 13.884 13.704 14.108
9+900.80 13.653 -6.40% 6.40% 13.459 13.863 13.683 14.087
9+902.20 13.632 -6.40% 6.40% 13.438 13.842 13.662 14.066
9+903.60 13.612 -6.40% 6.40% 13.418 13.822 13.642 14.046
9+905.00 13.591 -6.40% 6.40% 13.397 13.801 13.621 14.025
9+906.40 13.570 -6.40% 6.40% 13.376 13.780 13.600 14.004
9+907.80 13.549 -6.40% 6.40% 13.355 13.759 13.579 13.983
9+909.20 13.529 -6.40% 6.40% 13.335 13.739 13.559 13.963
9+910.60 13.508 -6.40% 6.40% 13.314 13.718 13.538 13.942

236 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+912.00 13.487 -6.40% 6.40% 13.293 13.697 13.517 13.921


9+913.40 13.466 -6.40% 6.40% 13.272 13.676 13.496 13.900
9+914.80 13.446 -6.40% 6.40% 13.252 13.656 13.476 13.880
9+916.20 13.425 -6.40% 6.40% 13.231 13.635 13.455 13.859
9+917.60 13.404 -6.40% 6.40% 13.210 13.614 13.434 13.838
9+919.00 13.383 -6.40% 6.40% 13.189 13.593 13.413 13.817
9+920.40 13.363 -6.40% 6.40% 13.169 13.573 13.393 13.797
9+921.80 13.342 -6.40% 6.40% 13.148 13.552 13.372 13.776
9+923.20 13.321 -6.31% 6.31% 13.132 13.529 13.353 13.750
9+924.60 13.300 -6.11% 6.10% 13.121 13.506 13.335 13.719
9+926.00 13.280 -5.91% 5.90% 13.110 13.483 13.317 13.689
9+927.40 13.259 -5.71% 5.70% 13.099 13.459 13.299 13.658
9+928.80 13.238 -5.51% 5.49% 13.088 13.435 13.281 13.627
9+930.20 13.217 -5.31% 5.29% 13.077 13.411 13.263 13.596
9+931.60 13.197 -5.11% 5.08% 13.066 13.389 13.246 13.566
9+933.00 13.176 -4.91% 4.88% 13.055 13.365 13.228 13.535
9+934.40 13.155 -4.71% 4.68% 13.044 13.341 13.210 13.504
9+935.80 13.134 -4.52% 4.47% 13.033 13.317 13.191 13.473
9+937.20 13.114 -4.32% 4.27% 13.022 13.294 13.174 13.443
9+938.60 13.093 -4.12% 4.07% 13.011 13.271 13.156 13.412
9+940.00 13.072 -3.92% 3.86% 13.000 13.247 13.138 13.381
9+941.40 13.051 -3.72% 3.66% 12.989 13.223 13.120 13.350
9+942.80 13.031 -3.52% 3.46% 12.978 13.200 13.103 13.320
9+944.20 13.010 -3.32% 3.25% 12.967 13.176 13.084 13.289
9+945.60 12.989 -3.12% 3.05% 12.956 13.153 13.066 13.258
9+947.00 12.968 -3.00% 2.85% 12.941 13.130 13.048 13.228
9+948.40 12.948 -3.00% 2.64% 12.921 13.110 13.031 13.198
9+949.80 12.927 -3.00% 2.44% 12.900 13.089 13.013 13.167
9+951.20 12.906 -3.00% 2.24% 12.879 13.068 12.995 13.136
9+952.60 12.885 -3.00% 2.03% 12.858 13.047 12.977 13.105

237 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+954.00 12.865 -3.00% 1.83% 12.838 13.027 12.959 13.075


9+955.40 12.844 -3.00% 1.63% 12.817 13.006 12.941 13.044
9+956.80 12.823 -3.00% 1.42% 12.796 12.985 12.923 13.013
9+958.20 12.802 -3.00% 1.22% 12.775 12.964 12.905 12.982
9+959.60 12.782 -3.00% 1.02% 12.755 12.944 12.888 12.952
9+961.00 12.761 -3.00% 0.81% 12.734 12.923 12.870 12.921
9+962.40 12.740 -3.00% 0.61% 12.713 12.902 12.851 12.890
9+963.80 12.719 -3.00% 0.41% 12.692 12.881 12.833 12.859
9+965.20 12.699 -3.00% 0.20% 12.672 12.861 12.816 12.829
9+966.60 12.678 -3.00% 0.00% 12.651 12.840 12.798 12.798
9+968.00 12.657 -3.00% -0.20% 12.630 12.819 12.780 12.767
9+969.40 12.636 -3.00% -0.41% 12.609 12.798 12.762 12.736
9+970.80 12.616 -3.00% -0.61% 12.589 12.778 12.745 12.706
9+972.20 12.595 -3.00% -0.81% 12.568 12.757 12.726 12.675
9+973.60 12.574 -3.00% -1.02% 12.547 12.736 12.708 12.644
9+975.00 12.553 -3.00% -1.22% 12.526 12.715 12.690 12.613
9+976.40 12.533 -3.00% -1.42% 12.506 12.695 12.673 12.583
9+977.80 12.512 -3.00% -1.63% 12.485 12.674 12.655 12.552
9+979.20 12.491 -3.00% -1.83% 12.464 12.653 12.637 12.521
9+980.60 12.470 -3.00% -2.04% 12.443 12.632 12.618 12.490
9+982.00 12.450 -3.00% -2.24% 12.423 12.612 12.601 12.460
9+983.40 12.429 -3.00% -2.44% 12.402 12.591 12.583 12.429
9+984.80 12.408 -3.00% -2.65% 12.381 12.570 12.565 12.398
9+986.20 12.387 -3.00% -2.85% 12.360 12.549 12.547 12.367
9+987.60 12.367 -3.00% -3.00% 12.340 12.529 12.529 12.340
9+989.00 12.346 -3.00% -3.00% 12.319 12.508 12.508 12.319
9+990.40 12.325 -3.00% -3.00% 12.298 12.487 12.487 12.298
9+991.80 12.304 -3.00% -3.00% 12.277 12.466 12.466 12.277
9+993.20 12.284 -3.00% -3.00% 12.257 12.446 12.446 12.257
9+994.60 12.263 -3.00% -3.00% 12.236 12.425 12.425 12.236

238 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

9+996.00 12.242 -3.00% -3.00% 12.215 12.404 12.404 12.215


9+997.40 12.221 -3.00% -3.00% 12.194 12.383 12.383 12.194
9+998.80 12.201 -3.00% -3.00% 12.174 12.363 12.363 12.174
10+000.20 12.180 -3.00% -3.00% 12.153 12.342 12.342 12.153
10+001.60 12.159 -3.00% -3.00% 12.132 12.321 12.321 12.132
10+003.00 12.138 -3.00% -3.00% 12.111 12.300 12.300 12.111
10+004.40 12.118 -3.00% -3.00% 12.091 12.280 12.280 12.091
10+005.80 12.097 -3.00% -3.00% 12.070 12.259 12.259 12.070
10+007.20 12.076 -3.00% -3.00% 12.049 12.238 12.238 12.049
10+008.60 12.055 -3.00% -3.00% 12.028 12.217 12.217 12.028
10+010.00 12.035 -3.00% -3.00% 12.008 12.197 12.197 12.008
10+011.40 12.014 -3.00% -3.00% 11.987 12.176 12.176 11.987
10+012.80 11.993 -3.00% -3.00% 11.966 12.155 12.155 11.966
10+014.20 11.972 -3.00% -3.00% 11.945 12.134 12.134 11.945
10+015.60 11.952 -3.00% -3.00% 11.925 12.114 12.114 11.925
10+017.00 11.931 -3.00% -3.00% 11.904 12.093 12.093 11.904
10+018.40 11.910 -3.00% -3.00% 11.883 12.072 12.072 11.883
10+019.80 11.889 -3.00% -3.00% 11.862 12.051 12.051 11.862
10+021.20 11.869 -3.00% -3.00% 11.842 12.031 12.031 11.842
10+022.60 11.848 -3.00% -3.00% 11.821 12.010 12.010 11.821
10+024.00 11.827 -3.00% -3.00% 11.800 11.989 11.989 11.800
10+025.40 11.806 -3.00% -3.00% 11.779 11.968 11.968 11.779
10+026.80 11.786 -3.00% -3.00% 11.759 11.948 11.948 11.759
10+028.20 11.765 -3.00% -3.00% 11.738 11.927 11.927 11.738
10+029.60 11.744 -3.00% -3.00% 11.717 11.906 11.906 11.717
10+031.00 11.723 -3.00% -3.00% 11.696 11.885 11.885 11.696
10+032.40 11.703 -3.00% -3.00% 11.676 11.865 11.865 11.676
10+033.80 11.682 -3.00% -3.00% 11.655 11.844 11.844 11.655
10+035.20 11.661 -3.00% -3.00% 11.634 11.823 11.823 11.634
10+036.60 11.640 -3.00% -3.00% 11.613 11.802 11.802 11.613

239 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+038.00 11.620 -3.00% -3.00% 11.593 11.782 11.782 11.593


10+039.40 11.599 -3.00% -3.00% 11.572 11.761 11.761 11.572
10+040.80 11.578 -3.00% -3.00% 11.551 11.740 11.740 11.551
10+042.20 11.557 -3.00% -3.00% 11.530 11.719 11.719 11.530
10+043.60 11.537 -3.00% -3.00% 11.510 11.699 11.699 11.510
10+045.00 11.516 -3.00% -3.00% 11.489 11.678 11.678 11.489
10+046.40 11.495 -3.00% -3.00% 11.468 11.657 11.657 11.468
10+047.80 11.474 -3.00% -3.00% 11.447 11.636 11.636 11.447
10+049.20 11.454 -3.00% -3.00% 11.427 11.616 11.616 11.427
10+050.60 11.433 -3.00% -3.00% 11.406 11.595 11.595 11.406
10+052.00 11.412 -3.00% -3.00% 11.385 11.574 11.574 11.385
10+053.40 11.391 -3.00% -3.00% 11.364 11.553 11.553 11.364
10+054.80 11.371 -3.00% -3.00% 11.344 11.533 11.533 11.344
10+056.20 11.350 -3.00% -3.00% 11.323 11.512 11.512 11.323
10+057.60 11.329 -3.00% -3.00% 11.302 11.491 11.491 11.302
10+059.00 11.308 -3.00% -3.00% 11.281 11.470 11.470 11.281
10+060.40 11.288 -3.00% -3.00% 11.261 11.450 11.450 11.261
10+061.80 11.267 -3.00% -3.00% 11.240 11.429 11.429 11.240
10+063.20 11.246 -3.00% -3.00% 11.219 11.408 11.408 11.219
10+064.60 11.225 -3.00% -3.00% 11.198 11.387 11.387 11.198
10+066.00 11.205 -3.00% -3.00% 11.178 11.367 11.367 11.178
10+067.40 11.184 -3.00% -3.00% 11.157 11.346 11.346 11.157
10+068.80 11.163 -3.00% -3.00% 11.136 11.325 11.325 11.136
10+070.20 11.142 -3.00% -3.00% 11.115 11.304 11.304 11.115
10+071.60 11.122 -3.00% -3.00% 11.095 11.284 11.284 11.095
10+073.00 11.101 -3.00% -3.00% 11.074 11.263 11.263 11.074
10+074.40 11.081 -3.00% -3.00% 11.054 11.243 11.243 11.054
10+075.80 11.061 -3.00% -3.00% 11.034 11.223 11.223 11.034
10+077.20 11.042 -3.00% -3.00% 11.015 11.204 11.204 11.015
10+078.60 11.023 -3.00% -3.00% 10.996 11.185 11.185 10.996

240 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+080.00 11.004 -3.00% -3.00% 10.977 11.166 11.166 10.977


10+081.40 10.986 -3.00% -3.00% 10.959 11.148 11.148 10.959
10+082.80 10.968 -3.00% -3.00% 10.941 11.130 11.130 10.941
10+084.20 10.950 -3.00% -3.00% 10.923 11.112 11.112 10.923
10+085.60 10.933 -3.00% -3.00% 10.906 11.095 11.095 10.906
10+087.00 10.916 -3.00% -3.00% 10.889 11.078 11.078 10.889
10+088.40 10.899 -3.00% -3.00% 10.872 11.061 11.061 10.872
10+089.80 10.883 -3.00% -3.00% 10.856 11.045 11.045 10.856
10+091.20 10.867 -3.00% -3.00% 10.840 11.029 11.029 10.840
10+092.60 10.852 -3.00% -3.00% 10.825 11.014 11.014 10.825
10+094.00 10.836 -3.00% -3.00% 10.809 10.998 10.998 10.809
10+095.40 10.822 -3.00% -3.00% 10.795 10.984 10.984 10.795
10+096.80 10.807 -3.00% -3.00% 10.780 10.969 10.969 10.780
10+098.20 10.793 -3.00% -3.00% 10.766 10.955 10.955 10.766
10+099.60 10.779 -3.00% -3.00% 10.752 10.941 10.941 10.752
10+101.00 10.766 -3.00% -3.00% 10.739 10.928 10.928 10.739
10+102.40 10.752 -3.00% -3.00% 10.725 10.914 10.914 10.725
10+103.80 10.740 -3.00% -3.00% 10.713 10.902 10.902 10.713
10+105.20 10.727 -3.00% -3.00% 10.700 10.889 10.889 10.700
10+106.60 10.715 -3.00% -3.00% 10.688 10.877 10.877 10.688
10+108.00 10.703 -3.00% -3.00% 10.676 10.865 10.865 10.676
10+109.40 10.692 -3.00% -3.00% 10.665 10.854 10.854 10.665
10+110.80 10.681 -3.00% -3.00% 10.654 10.843 10.843 10.654
10+112.20 10.670 -3.00% -3.00% 10.643 10.832 10.832 10.643
10+113.60 10.660 -3.00% -3.00% 10.633 10.822 10.822 10.633
10+115.00 10.650 -3.00% -3.00% 10.623 10.812 10.812 10.623
10+116.40 10.640 -3.00% -3.00% 10.613 10.802 10.802 10.613
10+117.80 10.631 -3.00% -3.00% 10.604 10.793 10.793 10.604
10+119.20 10.622 -3.00% -3.00% 10.595 10.784 10.784 10.595
10+120.60 10.613 -3.00% -3.00% 10.586 10.775 10.775 10.586

241 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+122.00 10.605 -3.00% -3.00% 10.578 10.767 10.767 10.578


10+123.40 10.597 -3.00% -3.00% 10.570 10.759 10.759 10.570
10+124.80 10.589 -3.00% -3.00% 10.562 10.751 10.751 10.562
10+126.20 10.582 -3.00% -3.00% 10.555 10.744 10.744 10.555
10+127.60 10.575 -3.00% -3.00% 10.548 10.737 10.737 10.548
10+129.00 10.568 -3.00% -3.00% 10.541 10.730 10.730 10.541
10+130.40 10.562 -3.00% -3.00% 10.535 10.724 10.724 10.535
10+131.80 10.556 -3.00% -3.00% 10.529 10.718 10.718 10.529
10+133.20 10.551 -3.00% -3.00% 10.524 10.713 10.713 10.524
10+134.60 10.545 -3.00% -3.00% 10.518 10.707 10.707 10.518
10+136.00 10.541 -3.00% -3.00% 10.514 10.703 10.703 10.514
10+137.40 10.536 -3.00% -3.00% 10.509 10.698 10.698 10.509
10+138.80 10.532 -3.00% -3.00% 10.505 10.694 10.694 10.505
10+140.20 10.528 -3.00% -3.00% 10.501 10.690 10.690 10.501
10+141.60 10.525 -3.00% -3.00% 10.498 10.687 10.687 10.498
10+143.00 10.521 -3.00% -3.00% 10.494 10.683 10.683 10.494
10+144.40 10.519 -3.00% -3.00% 10.492 10.681 10.681 10.492
10+145.80 10.516 -3.00% -3.00% 10.489 10.678 10.678 10.489
10+147.20 10.514 -3.00% -3.00% 10.487 10.676 10.676 10.487
10+148.60 10.512 -3.00% -3.00% 10.485 10.674 10.674 10.485
10+150.00 10.511 -3.00% -3.00% 10.484 10.673 10.673 10.484
10+151.40 10.510 -3.00% -3.00% 10.483 10.672 10.672 10.483
10+152.80 10.509 -3.00% -3.00% 10.482 10.671 10.671 10.482
10+154.20 10.509 -3.00% -3.00% 10.482 10.671 10.671 10.482
10+155.60 10.509 -3.00% -3.00% 10.482 10.671 10.671 10.482
10+157.00 10.509 -3.00% -3.00% 10.482 10.671 10.671 10.482
10+158.40 10.510 -3.00% -3.00% 10.483 10.672 10.672 10.483
10+159.80 10.511 -3.00% -3.00% 10.484 10.673 10.673 10.484
10+161.20 10.512 -3.00% -3.00% 10.485 10.674 10.674 10.485
10+162.60 10.514 -3.00% -3.00% 10.487 10.676 10.676 10.487

242 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+164.00 10.516 -3.00% -3.00% 10.489 10.678 10.678 10.489


10+165.40 10.519 -3.00% -3.00% 10.492 10.681 10.681 10.492
10+166.80 10.521 -3.00% -3.00% 10.494 10.683 10.683 10.494
10+168.20 10.524 -3.00% -3.00% 10.497 10.686 10.686 10.497
10+169.60 10.528 -3.00% -3.00% 10.501 10.690 10.690 10.501
10+171.00 10.532 -3.00% -3.00% 10.505 10.694 10.694 10.505
10+172.40 10.536 -3.00% -3.00% 10.509 10.698 10.698 10.509
10+173.80 10.540 -3.00% -3.00% 10.513 10.702 10.702 10.513
10+175.20 10.545 -3.00% -3.00% 10.518 10.707 10.707 10.518
10+176.60 10.550 -3.00% -3.00% 10.523 10.712 10.712 10.523
10+178.00 10.556 -3.00% -3.00% 10.529 10.718 10.718 10.529
10+179.40 10.562 -3.00% -3.00% 10.535 10.724 10.724 10.535
10+180.80 10.568 -3.00% -3.00% 10.541 10.730 10.730 10.541
10+182.20 10.575 -3.00% -3.00% 10.548 10.737 10.737 10.548
10+183.60 10.581 -3.00% -3.00% 10.554 10.743 10.743 10.554
10+185.00 10.589 -3.00% -3.00% 10.562 10.751 10.751 10.562
10+186.40 10.596 -3.00% -3.00% 10.569 10.758 10.758 10.569
10+187.80 10.604 -3.00% -3.00% 10.577 10.766 10.766 10.577
10+189.20 10.613 -3.00% -3.00% 10.586 10.775 10.775 10.586
10+190.60 10.621 -3.00% -3.00% 10.594 10.783 10.783 10.594
10+192.00 10.630 -3.00% -3.00% 10.603 10.792 10.792 10.603
10+193.40 10.640 -3.00% -3.00% 10.613 10.802 10.802 10.613
10+194.80 10.649 -3.00% -3.00% 10.622 10.811 10.811 10.622
10+196.20 10.659 -3.00% -3.00% 10.632 10.821 10.821 10.632
10+197.60 10.670 -3.00% -3.00% 10.643 10.832 10.832 10.643
10+199.00 10.680 -3.00% -3.00% 10.653 10.842 10.842 10.653
10+200.40 10.691 -3.00% -3.00% 10.664 10.853 10.853 10.664
10+201.80 10.703 -3.00% -3.00% 10.676 10.865 10.865 10.676
10+203.20 10.714 -3.00% -3.00% 10.687 10.876 10.876 10.687
10+204.60 10.725 -3.00% -3.00% 10.698 10.887 10.887 10.698

243 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+206.00 10.736 -3.00% -3.00% 10.709 10.898 10.898 10.709


10+207.40 10.747 -3.00% -3.00% 10.720 10.909 10.909 10.720
10+208.80 10.758 -3.00% -3.00% 10.731 10.920 10.920 10.731
10+210.20 10.770 -3.00% -3.00% 10.743 10.932 10.932 10.743
10+211.60 10.781 -3.00% -3.00% 10.754 10.943 10.943 10.754
10+213.00 10.792 -3.00% -3.00% 10.765 10.954 10.954 10.765
10+214.40 10.803 -3.00% -3.00% 10.776 10.965 10.965 10.776
10+215.80 10.814 -3.00% -3.00% 10.787 10.976 10.976 10.787
10+217.20 10.825 -3.00% -3.00% 10.798 10.987 10.987 10.798
10+218.60 10.837 -3.00% -3.00% 10.810 10.999 10.999 10.810
10+220.00 10.848 -3.00% -3.00% 10.821 11.010 11.010 10.821
10+221.40 10.859 -3.00% -3.00% 10.832 11.021 11.021 10.832
10+222.80 10.870 -3.00% -3.00% 10.843 11.032 11.032 10.843
10+224.20 10.881 -3.00% -3.00% 10.854 11.043 11.043 10.854
10+225.60 10.892 -3.00% -3.00% 10.865 11.054 11.054 10.865
10+227.00 10.904 -3.00% -3.00% 10.877 11.066 11.066 10.877
10+228.40 10.915 -3.00% -3.00% 10.888 11.077 11.077 10.888
10+229.80 10.926 -3.00% -3.00% 10.899 11.088 11.088 10.899
10+231.20 10.937 -3.00% -3.00% 10.910 11.099 11.099 10.910
10+232.60 10.948 -3.00% -3.00% 10.921 11.110 11.110 10.921
10+234.00 10.959 -3.00% -3.00% 10.932 11.121 11.121 10.932
10+235.40 10.971 -3.00% -3.00% 10.944 11.133 11.133 10.944
10+236.80 10.982 -3.00% -3.00% 10.955 11.144 11.144 10.955
10+238.20 10.993 -3.00% -3.00% 10.966 11.155 11.155 10.966
10+239.60 11.004 -3.00% -3.00% 10.977 11.166 11.166 10.977
10+241.00 11.015 -3.00% -3.00% 10.988 11.177 11.177 10.988
10+242.40 11.026 -3.00% -3.00% 10.999 11.188 11.188 10.999
10+243.80 11.038 -3.00% -3.00% 11.011 11.200 11.200 11.011
10+245.20 11.049 -3.00% -3.00% 11.022 11.211 11.211 11.022
10+246.60 11.060 -3.00% -3.00% 11.033 11.222 11.222 11.033

244 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+248.00 11.071 -3.00% -3.00% 11.044 11.233 11.233 11.044


10+249.40 11.082 -3.00% -3.00% 11.055 11.244 11.244 11.055
10+250.80 11.094 -3.00% -3.00% 11.067 11.256 11.256 11.067
10+252.20 11.105 -3.00% -3.00% 11.078 11.267 11.267 11.078
10+253.60 11.116 -3.00% -3.00% 11.089 11.278 11.278 11.089
10+255.00 11.127 -3.00% -3.00% 11.100 11.289 11.289 11.100
10+256.40 11.138 -3.00% -3.00% 11.111 11.300 11.300 11.111
10+257.80 11.149 -3.00% -3.00% 11.122 11.311 11.311 11.122
10+259.20 11.161 -3.00% -3.00% 11.134 11.323 11.323 11.134
10+260.60 11.172 -3.00% -3.00% 11.145 11.334 11.334 11.145
10+262.00 11.183 -3.00% -3.00% 11.156 11.345 11.345 11.156
10+263.40 11.194 -3.00% -3.00% 11.167 11.356 11.356 11.167
10+264.80 11.205 -3.00% -3.00% 11.178 11.367 11.367 11.178
10+266.20 11.216 -3.00% -3.00% 11.189 11.378 11.378 11.189
10+267.60 11.228 -3.00% -3.00% 11.201 11.390 11.390 11.201
10+269.00 11.239 -3.00% -3.00% 11.212 11.401 11.401 11.212
10+270.40 11.250 -3.00% -3.00% 11.223 11.412 11.412 11.223
10+271.80 11.261 -3.00% -3.00% 11.234 11.423 11.423 11.234
10+273.20 11.272 -3.00% -3.00% 11.245 11.434 11.434 11.245
10+274.60 11.283 -3.00% -3.00% 11.256 11.445 11.445 11.256
10+276.00 11.295 -3.00% -3.00% 11.268 11.457 11.457 11.268
10+277.40 11.306 -3.00% -3.00% 11.279 11.468 11.468 11.279
10+278.80 11.317 -3.00% -3.00% 11.290 11.479 11.479 11.290
10+280.20 11.328 -3.00% -3.00% 11.301 11.490 11.490 11.301
10+281.60 11.339 -3.00% -3.00% 11.312 11.501 11.501 11.312
10+283.00 11.350 -3.00% -3.00% 11.323 11.512 11.512 11.323
10+284.40 11.362 -3.00% -3.00% 11.335 11.524 11.524 11.335
10+285.80 11.373 -3.00% -3.00% 11.346 11.535 11.535 11.346
10+287.20 11.384 -3.00% -3.00% 11.357 11.546 11.546 11.357
10+288.60 11.395 -3.00% -3.00% 11.368 11.557 11.557 11.368

245 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+290.00 11.406 -3.00% -3.00% 11.379 11.568 11.568 11.379


10+291.40 11.417 -3.00% -3.00% 11.390 11.579 11.579 11.390
10+292.80 11.429 -3.00% -3.00% 11.402 11.591 11.591 11.402
10+294.20 11.440 -3.00% -3.00% 11.413 11.602 11.602 11.413
10+295.60 11.451 -3.00% -3.00% 11.424 11.613 11.613 11.424
10+297.00 11.462 -3.00% -3.00% 11.435 11.624 11.624 11.435
10+298.40 11.473 -3.00% -3.00% 11.446 11.635 11.635 11.446
10+299.80 11.484 -3.00% -3.00% 11.457 11.646 11.646 11.457
10+301.20 11.496 -3.00% -3.00% 11.469 11.658 11.658 11.469
10+302.60 11.507 -3.00% -3.00% 11.480 11.669 11.669 11.480
10+304.00 11.518 -3.00% -3.00% 11.491 11.680 11.680 11.491
10+305.40 11.529 -3.00% -3.00% 11.502 11.691 11.691 11.502
10+306.80 11.540 -3.00% -3.00% 11.513 11.702 11.702 11.513
10+308.20 11.552 -3.00% -3.00% 11.525 11.714 11.714 11.525
10+309.60 11.563 -3.00% -3.00% 11.536 11.725 11.725 11.536
10+311.00 11.574 -3.00% -3.00% 11.547 11.736 11.736 11.547
10+312.40 11.585 -3.00% -3.00% 11.558 11.747 11.747 11.558
10+313.80 11.596 -3.00% -3.00% 11.569 11.758 11.758 11.569
10+315.20 11.607 -3.00% -3.00% 11.580 11.769 11.769 11.580
10+316.60 11.619 -3.00% -3.00% 11.592 11.781 11.781 11.592
10+318.00 11.630 -3.00% -3.00% 11.603 11.792 11.792 11.603
10+319.40 11.641 -3.00% -3.00% 11.614 11.803 11.803 11.614
10+320.80 11.652 -3.00% -3.00% 11.625 11.814 11.814 11.625
10+322.20 11.663 -3.00% -3.00% 11.636 11.825 11.825 11.636
10+323.60 11.674 -3.00% -3.00% 11.647 11.836 11.836 11.647
10+325.00 11.686 -3.00% -3.00% 11.659 11.848 11.848 11.659
10+326.40 11.697 -3.00% -3.00% 11.670 11.859 11.859 11.670
10+327.80 11.708 -3.00% -3.00% 11.681 11.870 11.870 11.681
10+329.20 11.719 -3.00% -3.00% 11.692 11.881 11.881 11.692
10+330.60 11.730 -3.00% -3.00% 11.703 11.892 11.892 11.703

246 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+332.00 11.741 -3.00% -3.00% 11.714 11.903 11.903 11.714


10+333.40 11.752 -3.00% -3.00% 11.725 11.914 11.914 11.725
10+334.80 11.763 -3.00% -3.00% 11.736 11.925 11.925 11.736
10+336.20 11.774 -3.00% -3.00% 11.747 11.936 11.936 11.747
10+337.60 11.785 -3.00% -3.00% 11.758 11.947 11.947 11.758
10+339.00 11.796 -3.00% -3.00% 11.769 11.958 11.958 11.769
10+340.40 11.806 -3.00% -3.00% 11.779 11.968 11.968 11.779
10+341.80 11.817 -3.00% -3.00% 11.790 11.979 11.979 11.790
10+343.20 11.828 -3.00% -3.00% 11.801 11.990 11.990 11.801
10+344.60 11.838 -3.00% -3.00% 11.811 12.000 12.000 11.811
10+346.00 11.848 -3.00% -3.00% 11.821 12.010 12.010 11.821
10+347.40 11.859 -3.00% -3.00% 11.832 12.021 12.021 11.832
10+348.80 11.869 -3.00% -3.00% 11.842 12.031 12.031 11.842
10+350.20 11.879 -3.00% -3.00% 11.852 12.041 12.041 11.852
10+351.60 11.889 -3.00% -3.00% 11.862 12.051 12.051 11.862
10+353.00 11.899 -3.00% -3.00% 11.872 12.061 12.061 11.872
10+354.40 11.909 -3.00% -3.00% 11.882 12.071 12.071 11.882
10+355.80 11.919 -3.00% -3.00% 11.892 12.081 12.081 11.892
10+357.20 11.929 -3.00% -3.00% 11.902 12.091 12.091 11.902
10+358.60 11.938 -3.00% -3.00% 11.911 12.100 12.100 11.911
10+360.00 11.948 -3.00% -3.00% 11.921 12.110 12.110 11.921
10+361.40 11.958 -3.00% -3.00% 11.931 12.120 12.120 11.931
10+362.80 11.967 -3.00% -3.00% 11.940 12.129 12.129 11.940
10+364.20 11.976 -3.00% -3.00% 11.949 12.138 12.138 11.949
10+365.60 11.986 -3.00% -3.00% 11.959 12.148 12.148 11.959
10+367.00 11.995 -3.00% -3.00% 11.968 12.157 12.157 11.968
10+368.40 12.004 -3.00% -3.00% 11.977 12.166 12.166 11.977
10+369.80 12.013 -3.00% -3.00% 11.986 12.175 12.175 11.986
10+371.20 12.022 -3.00% -3.00% 11.995 12.184 12.184 11.995
10+372.60 12.031 -3.00% -3.00% 12.004 12.193 12.193 12.004

247 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+374.00 12.040 -3.00% -3.00% 12.013 12.202 12.202 12.013


10+375.40 12.049 -3.00% -3.00% 12.022 12.211 12.211 12.022
10+376.80 12.058 -3.00% -3.00% 12.031 12.220 12.220 12.031
10+378.20 12.066 -3.00% -3.00% 12.039 12.228 12.228 12.039
10+379.60 12.075 -3.00% -3.00% 12.048 12.237 12.237 12.048
10+381.00 12.084 -3.00% -3.00% 12.057 12.246 12.246 12.057
10+382.40 12.092 -3.00% -3.00% 12.065 12.254 12.254 12.065
10+383.80 12.100 -3.00% -3.00% 12.073 12.262 12.262 12.073
10+385.20 12.109 -3.00% -3.00% 12.082 12.271 12.271 12.082
10+386.60 12.117 -3.00% -3.00% 12.090 12.279 12.279 12.090
10+388.00 12.125 -3.00% -3.00% 12.098 12.287 12.287 12.098
10+389.40 12.133 -3.00% -3.00% 12.106 12.295 12.295 12.106
10+390.80 12.141 -3.00% -3.00% 12.114 12.303 12.303 12.114
10+392.20 12.149 -3.00% -3.00% 12.122 12.311 12.311 12.122
10+393.60 12.157 -3.00% -3.00% 12.130 12.319 12.319 12.130
10+395.00 12.165 -3.00% -3.00% 12.138 12.327 12.327 12.138
10+396.40 12.173 -3.00% -3.00% 12.146 12.335 12.335 12.146
10+397.80 12.180 -3.00% -3.00% 12.153 12.342 12.342 12.153
10+399.20 12.188 -3.00% -3.00% 12.161 12.350 12.350 12.161
10+400.60 12.195 -3.00% -3.00% 12.168 12.357 12.357 12.168
10+402.00 12.203 -3.00% -3.00% 12.176 12.365 12.365 12.176
10+403.40 12.210 -3.00% -3.00% 12.183 12.372 12.372 12.183
10+404.80 12.217 -3.00% -3.00% 12.190 12.379 12.379 12.190
10+406.20 12.225 -3.00% -3.00% 12.198 12.387 12.387 12.198
10+407.60 12.232 -3.00% -3.00% 12.205 12.394 12.394 12.205
10+409.00 12.239 -3.00% -3.00% 12.212 12.401 12.401 12.212
10+410.40 12.246 -3.00% -3.00% 12.219 12.408 12.408 12.219
10+411.80 12.253 -3.00% -3.00% 12.226 12.415 12.415 12.226
10+413.20 12.260 -3.00% -3.00% 12.233 12.422 12.422 12.233
10+414.60 12.267 -3.00% -3.00% 12.240 12.429 12.429 12.240

248 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+416.00 12.274 -3.00% -3.00% 12.247 12.436 12.436 12.247


10+417.40 12.281 -3.00% -3.00% 12.254 12.443 12.443 12.254
10+418.80 12.288 -3.00% -3.00% 12.261 12.450 12.450 12.261
10+420.20 12.295 -3.00% -3.00% 12.268 12.457 12.457 12.268
10+421.60 12.301 -3.00% -3.00% 12.274 12.463 12.463 12.274
10+423.00 12.308 -3.00% -3.00% 12.281 12.470 12.470 12.281
10+424.40 12.315 -3.00% -3.00% 12.288 12.477 12.477 12.288
10+425.80 12.322 -3.00% -3.00% 12.295 12.484 12.484 12.295
10+427.20 12.329 -3.00% -3.00% 12.302 12.491 12.491 12.302
10+428.60 12.336 -3.00% -3.00% 12.309 12.498 12.498 12.309
10+430.00 12.343 -3.00% -3.00% 12.316 12.505 12.505 12.316
10+431.40 12.350 -3.00% -3.00% 12.323 12.512 12.512 12.323
10+432.80 12.357 -3.00% -3.00% 12.330 12.519 12.519 12.330
10+434.20 12.364 -3.00% -3.00% 12.337 12.526 12.526 12.337
10+435.60 12.371 -3.00% -3.00% 12.344 12.533 12.533 12.344
10+437.00 12.378 -3.00% -3.00% 12.351 12.540 12.540 12.351
10+438.40 12.385 -3.00% -3.00% 12.358 12.547 12.547 12.358
10+439.80 12.392 -3.00% -3.00% 12.365 12.554 12.554 12.365
10+441.20 12.399 -3.00% -3.00% 12.372 12.561 12.561 12.372
10+442.60 12.406 -3.00% -3.00% 12.379 12.568 12.568 12.379
10+444.00 12.413 -3.00% -3.00% 12.386 12.575 12.575 12.386
10+445.40 12.420 -3.00% -3.00% 12.393 12.582 12.582 12.393
10+446.80 12.427 -3.00% -3.00% 12.400 12.589 12.589 12.400
10+448.20 12.434 -3.00% -3.00% 12.407 12.596 12.596 12.407
10+449.60 12.441 -3.00% -3.00% 12.414 12.603 12.603 12.414
10+451.00 12.448 -3.00% -3.00% 12.421 12.610 12.610 12.421
10+452.40 12.455 -3.00% -3.00% 12.428 12.617 12.617 12.428
10+453.80 12.462 -3.00% -3.00% 12.435 12.624 12.624 12.435
10+455.20 12.469 -3.00% -3.00% 12.442 12.631 12.631 12.442
10+456.60 12.476 -3.00% -3.00% 12.449 12.638 12.638 12.449

249 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+458.00 12.483 -3.00% -3.00% 12.456 12.645 12.645 12.456


10+459.40 12.490 -3.00% -3.00% 12.463 12.652 12.652 12.463
10+460.80 12.497 -3.00% -3.00% 12.470 12.659 12.659 12.470
10+462.20 12.504 -3.00% -3.00% 12.477 12.666 12.666 12.477
10+463.60 12.511 -3.00% -3.00% 12.484 12.673 12.673 12.484
10+465.00 12.518 -3.00% -3.00% 12.491 12.680 12.680 12.491
10+466.40 12.524 -3.00% -3.00% 12.497 12.686 12.686 12.497
10+467.80 12.531 -3.00% -3.00% 12.504 12.693 12.693 12.504
10+469.20 12.538 -3.00% -3.00% 12.511 12.700 12.700 12.511
10+470.60 12.545 -3.00% -3.00% 12.518 12.707 12.707 12.518
10+472.00 12.552 -3.00% -3.00% 12.525 12.714 12.714 12.525
10+473.40 12.559 -3.00% -3.00% 12.532 12.721 12.721 12.532
10+474.80 12.566 -3.00% -3.00% 12.539 12.728 12.728 12.539
10+476.20 12.573 -3.00% -3.00% 12.546 12.735 12.735 12.546
10+477.60 12.580 -3.00% -3.00% 12.553 12.742 12.742 12.553
10+479.00 12.587 -3.00% -3.00% 12.560 12.749 12.749 12.560
10+480.40 12.594 -3.00% -3.00% 12.567 12.756 12.756 12.567
10+481.80 12.601 -3.00% -3.00% 12.574 12.763 12.763 12.574
10+483.20 12.608 -3.00% -3.00% 12.581 12.770 12.770 12.581
10+484.60 12.615 -3.00% -3.00% 12.588 12.777 12.777 12.588
10+486.00 12.622 -3.00% -3.00% 12.595 12.784 12.784 12.595
10+487.40 12.629 -3.00% -3.00% 12.602 12.791 12.791 12.602
10+488.80 12.636 -3.00% -3.00% 12.609 12.798 12.798 12.609
10+490.20 12.643 -3.00% -3.00% 12.616 12.805 12.805 12.616
10+491.60 12.650 -3.00% -3.00% 12.623 12.812 12.812 12.623
10+493.00 12.657 -3.00% -3.00% 12.630 12.819 12.819 12.630
10+494.40 12.664 -3.00% -3.00% 12.637 12.826 12.826 12.637
10+495.80 12.671 -3.00% -3.00% 12.644 12.833 12.833 12.644
10+497.20 12.678 -3.00% -3.00% 12.651 12.840 12.840 12.651
10+498.60 12.685 -3.00% -3.00% 12.658 12.847 12.847 12.658

250 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+500.00 12.692 -3.00% -3.00% 12.665 12.854 12.854 12.665


10+501.40 12.699 -3.00% -3.00% 12.672 12.861 12.861 12.672
10+502.80 12.706 -3.00% -3.00% 12.679 12.868 12.868 12.679
10+504.20 12.713 -3.00% -3.00% 12.686 12.875 12.875 12.686
10+505.60 12.720 -3.00% -3.00% 12.693 12.882 12.882 12.693
10+507.00 12.727 -3.00% -3.00% 12.700 12.889 12.889 12.700
10+508.40 12.734 -3.00% -3.00% 12.707 12.896 12.896 12.707
10+509.80 12.741 -3.00% -3.00% 12.714 12.903 12.903 12.714
10+511.20 12.747 -3.00% -3.00% 12.720 12.909 12.909 12.720
10+512.60 12.754 -3.00% -3.00% 12.727 12.916 12.916 12.727
10+514.00 12.761 -3.00% -3.00% 12.734 12.923 12.923 12.734
10+515.40 12.768 -3.00% -3.00% 12.741 12.930 12.930 12.741
10+516.80 12.775 -3.00% -3.00% 12.748 12.937 12.937 12.748
10+518.20 12.782 -3.00% -3.00% 12.755 12.944 12.944 12.755
10+519.60 12.789 -3.00% -3.00% 12.762 12.951 12.951 12.762
10+521.00 12.796 -3.00% -3.00% 12.769 12.958 12.958 12.769
10+522.40 12.803 -3.00% -3.00% 12.776 12.965 12.965 12.776
10+523.80 12.810 -3.00% -3.00% 12.783 12.972 12.972 12.783
10+525.20 12.817 -3.00% -3.00% 12.790 12.979 12.979 12.790
10+526.60 12.824 -3.00% -3.00% 12.797 12.986 12.986 12.797
10+528.00 12.831 -3.00% -3.00% 12.804 12.993 12.993 12.804
10+529.40 12.838 -3.00% -3.00% 12.811 13.000 13.000 12.811
10+530.80 12.845 -3.00% -3.00% 12.818 13.007 13.007 12.818
10+532.20 12.852 -3.00% -3.00% 12.825 13.014 13.014 12.825
10+533.60 12.859 -3.00% -3.00% 12.832 13.021 13.021 12.832
10+535.00 12.867 -3.00% -3.00% 12.840 13.029 13.029 12.840
10+536.40 12.874 -3.00% -3.00% 12.847 13.036 13.036 12.847
10+537.80 12.882 -3.00% -3.00% 12.855 13.044 13.044 12.855
10+539.20 12.890 -3.00% -3.00% 12.863 13.052 13.052 12.863
10+540.60 12.898 -3.00% -3.00% 12.871 13.060 13.060 12.871

251 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+542.00 12.906 -3.00% -3.00% 12.879 13.068 13.068 12.879


10+543.40 12.914 -3.00% -3.00% 12.887 13.076 13.076 12.887
10+544.80 12.922 -3.00% -3.00% 12.895 13.084 13.084 12.895
10+546.20 12.930 -3.00% -3.00% 12.903 13.092 13.092 12.903
10+547.60 12.939 -3.00% -3.00% 12.912 13.101 13.101 12.912
10+549.00 12.948 -3.00% -3.00% 12.921 13.110 13.110 12.921
10+550.40 12.956 -3.00% -3.00% 12.929 13.118 13.118 12.929
10+551.80 12.965 -3.00% -3.00% 12.938 13.127 13.127 12.938
10+553.20 12.974 -3.00% -3.00% 12.947 13.136 13.136 12.947
10+554.60 12.983 -3.00% -3.00% 12.956 13.145 13.145 12.956
10+556.00 12.993 -3.00% -3.00% 12.966 13.155 13.155 12.966
10+557.40 13.002 -3.00% -3.00% 12.975 13.164 13.164 12.975
10+558.80 13.012 -3.00% -3.00% 12.985 13.174 13.174 12.985
10+560.20 13.021 -3.00% -3.00% 12.994 13.183 13.183 12.994
10+561.60 13.031 -3.00% -3.00% 13.004 13.193 13.193 13.004
10+563.00 13.041 -3.00% -3.00% 13.014 13.203 13.203 13.014
10+564.40 13.051 -3.00% -3.00% 13.024 13.213 13.213 13.024
10+565.80 13.061 -3.00% -3.00% 13.034 13.223 13.223 13.034
10+567.20 13.072 -3.00% -3.00% 13.045 13.234 13.234 13.045
10+568.60 13.082 -3.00% -3.00% 13.055 13.244 13.244 13.055
10+570.00 13.093 -3.00% -3.00% 13.066 13.255 13.255 13.066
10+571.40 13.103 -3.00% -3.00% 13.076 13.265 13.265 13.076
10+572.80 13.114 -3.00% -3.00% 13.087 13.276 13.276 13.087
10+574.20 13.125 -3.00% -3.00% 13.098 13.287 13.287 13.098
10+575.60 13.136 -3.00% -3.00% 13.109 13.298 13.298 13.109
10+577.00 13.147 -3.00% -3.00% 13.120 13.309 13.309 13.120
10+578.40 13.159 -3.00% -3.00% 13.132 13.321 13.321 13.132
10+579.80 13.170 -3.00% -3.00% 13.143 13.332 13.332 13.143
10+581.20 13.182 -3.00% -3.00% 13.155 13.344 13.344 13.155
10+582.60 13.193 -3.00% -3.00% 13.166 13.355 13.355 13.166

252 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+584.00 13.205 -3.00% -3.00% 13.178 13.367 13.367 13.178


10+585.40 13.217 -3.00% -3.00% 13.190 13.379 13.379 13.190
10+586.80 13.229 -3.00% -3.00% 13.202 13.391 13.391 13.202
10+588.20 13.242 -3.00% -3.00% 13.215 13.404 13.404 13.215
10+589.60 13.254 -3.00% -3.00% 13.227 13.416 13.416 13.227
10+591.00 13.266 -3.00% -3.00% 13.239 13.428 13.428 13.239
10+592.40 13.279 -3.00% -3.00% 13.252 13.441 13.441 13.252
10+593.80 13.291 -3.00% -3.00% 13.264 13.453 13.453 13.264
10+595.20 13.304 -3.00% -3.00% 13.277 13.466 13.466 13.277
10+596.60 13.316 -3.00% -3.00% 13.289 13.478 13.478 13.289
10+598.00 13.329 -3.00% -3.00% 13.302 13.491 13.491 13.302
10+599.40 13.341 -3.00% -3.00% 13.314 13.503 13.503 13.314
10+600.80 13.354 -3.00% -3.00% 13.327 13.516 13.516 13.327
10+602.20 13.366 -3.00% -3.00% 13.339 13.528 13.528 13.339
10+603.60 13.378 -3.00% -3.00% 13.351 13.540 13.540 13.351
10+605.00 13.391 -3.00% -3.00% 13.364 13.553 13.553 13.364
10+606.40 13.403 -3.00% -3.00% 13.376 13.565 13.565 13.376
10+607.80 13.416 -3.00% -3.00% 13.389 13.578 13.578 13.389
10+609.20 13.428 -3.00% -3.00% 13.401 13.590 13.590 13.401
10+610.60 13.441 -3.00% -3.00% 13.414 13.603 13.603 13.414
10+612.00 13.453 -3.00% -3.00% 13.426 13.615 13.615 13.426
10+613.40 13.466 -3.00% -3.00% 13.439 13.628 13.628 13.439
10+614.80 13.478 -3.00% -3.00% 13.451 13.640 13.640 13.451
10+616.20 13.491 -3.00% -3.00% 13.464 13.653 13.653 13.464
10+617.60 13.503 -3.00% -3.00% 13.476 13.665 13.665 13.476
10+619.00 13.515 -3.00% -3.00% 13.488 13.677 13.677 13.488
10+620.40 13.528 -3.00% -3.00% 13.501 13.690 13.690 13.501
10+621.80 13.540 -3.00% -3.00% 13.513 13.702 13.702 13.513
10+623.20 13.553 -3.00% -3.00% 13.526 13.715 13.715 13.526
10+624.60 13.565 -3.00% -3.00% 13.538 13.727 13.727 13.538

253 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+626.00 13.578 -3.00% -3.00% 13.551 13.740 13.740 13.551


10+627.40 13.590 -3.00% -3.00% 13.563 13.752 13.752 13.563
10+628.80 13.603 -3.00% -3.00% 13.576 13.765 13.765 13.576
10+630.20 13.615 -3.00% -3.00% 13.588 13.777 13.777 13.588
10+631.60 13.628 -3.00% -3.00% 13.601 13.790 13.790 13.601
10+633.00 13.640 -3.00% -3.00% 13.613 13.802 13.802 13.613
10+634.40 13.652 -3.00% -3.00% 13.625 13.814 13.814 13.625
10+635.80 13.665 -3.00% -3.00% 13.638 13.827 13.827 13.638
10+637.20 13.677 -3.00% -3.00% 13.650 13.839 13.839 13.650
10+638.60 13.690 -3.00% -3.00% 13.663 13.852 13.852 13.663
10+640.00 13.702 -3.00% -3.00% 13.675 13.864 13.864 13.675
10+641.40 13.715 -3.00% -3.00% 13.688 13.877 13.877 13.688
10+642.80 13.727 -3.00% -3.00% 13.700 13.889 13.889 13.700
10+644.20 13.740 -3.00% -3.00% 13.713 13.902 13.902 13.713
10+645.60 13.752 -3.00% -3.00% 13.725 13.914 13.914 13.725
10+647.00 13.765 -3.00% -3.00% 13.738 13.927 13.927 13.738
10+648.40 13.777 -3.00% -3.00% 13.750 13.939 13.939 13.750
10+649.80 13.789 -3.00% -3.00% 13.762 13.951 13.951 13.762
10+651.20 13.802 -3.00% -3.00% 13.775 13.964 13.964 13.775
10+652.60 13.814 -3.00% -3.00% 13.787 13.976 13.976 13.787
10+654.00 13.827 -3.00% -3.00% 13.800 13.989 13.989 13.800
10+655.40 13.839 -3.00% -3.00% 13.812 14.001 14.001 13.812
10+656.80 13.852 -3.00% -3.00% 13.825 14.014 14.014 13.825
10+658.20 13.864 -3.00% -3.00% 13.837 14.026 14.026 13.837
10+659.60 13.877 -3.00% -3.00% 13.850 14.039 14.039 13.850
10+661.00 13.889 -3.00% -3.00% 13.862 14.051 14.051 13.862
10+662.40 13.901 -3.00% -3.00% 13.874 14.063 14.063 13.874
10+663.80 13.914 -3.00% -3.00% 13.887 14.076 14.076 13.887
10+665.20 13.926 -3.00% -3.00% 13.899 14.088 14.088 13.899
10+666.60 13.939 -3.00% -3.00% 13.912 14.101 14.101 13.912

254 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+668.00 13.951 -3.00% -3.00% 13.924 14.113 14.113 13.924


10+669.40 13.964 -3.00% -3.00% 13.937 14.126 14.126 13.937
10+670.80 13.976 -3.00% -3.00% 13.949 14.138 14.138 13.949
10+672.20 13.989 -3.00% -3.00% 13.962 14.151 14.151 13.962
10+673.60 14.001 -3.00% -3.00% 13.974 14.163 14.163 13.974
10+675.00 14.014 -3.00% -3.00% 13.987 14.176 14.176 13.987
10+676.40 14.026 -3.00% -3.00% 13.999 14.188 14.188 13.999
10+677.80 14.038 -3.00% -3.00% 14.011 14.200 14.200 14.011
10+679.20 14.051 -3.00% -3.00% 14.024 14.213 14.213 14.024
10+680.60 14.063 -3.00% -3.00% 14.036 14.225 14.225 14.036
10+682.00 14.076 -3.00% -3.00% 14.049 14.238 14.238 14.049
10+683.40 14.088 -3.00% -3.00% 14.061 14.250 14.250 14.061
10+684.80 14.101 -3.00% -3.00% 14.074 14.263 14.263 14.074
10+686.20 14.113 -3.00% -3.00% 14.086 14.275 14.275 14.086
10+687.60 14.126 -3.00% -3.00% 14.099 14.288 14.288 14.099
10+689.00 14.138 -3.00% -3.00% 14.111 14.300 14.300 14.111
10+690.40 14.151 -3.00% -3.00% 14.124 14.313 14.313 14.124
10+691.80 14.163 -3.00% -3.00% 14.136 14.325 14.325 14.136
10+693.20 14.175 -3.00% -3.00% 14.148 14.337 14.337 14.148
10+694.60 14.188 -3.00% -3.00% 14.161 14.350 14.350 14.161
10+696.00 14.200 -3.00% -3.00% 14.173 14.362 14.362 14.173
10+697.40 14.213 -3.00% -3.00% 14.186 14.375 14.375 14.186
10+698.80 14.225 -3.00% -3.00% 14.198 14.387 14.387 14.198
10+700.20 14.238 -3.00% -3.00% 14.211 14.400 14.400 14.211
10+701.60 14.250 -3.00% -3.00% 14.223 14.412 14.412 14.223
10+703.00 14.263 -3.00% -3.00% 14.236 14.425 14.425 14.236
10+704.40 14.275 -3.00% -3.00% 14.248 14.437 14.437 14.248
10+705.80 14.287 -3.00% -3.00% 14.260 14.449 14.449 14.260
10+707.20 14.300 -3.00% -3.00% 14.273 14.462 14.462 14.273
10+708.60 14.312 -3.00% -3.00% 14.285 14.474 14.474 14.285

255 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+710.00 14.325 -3.00% -3.00% 14.298 14.487 14.487 14.298


10+711.40 14.337 -3.00% -3.00% 14.310 14.499 14.499 14.310
10+712.80 14.350 -3.00% -3.00% 14.323 14.512 14.512 14.323
10+714.20 14.362 -3.00% -3.00% 14.335 14.524 14.524 14.335
10+715.60 14.375 -3.00% -3.00% 14.348 14.537 14.537 14.348
10+717.00 14.387 -3.00% -3.00% 14.360 14.549 14.549 14.360
10+718.40 14.400 -3.00% -3.00% 14.373 14.562 14.562 14.373
10+719.80 14.413 -3.00% -3.00% 14.386 14.575 14.575 14.386
10+721.20 14.426 -3.00% -3.00% 14.399 14.588 14.588 14.399
10+722.60 14.440 -3.00% -3.00% 14.413 14.602 14.602 14.413
10+724.00 14.454 -3.00% -3.00% 14.427 14.616 14.616 14.427
10+725.40 14.469 -3.00% -3.00% 14.442 14.631 14.631 14.442
10+726.80 14.484 -3.00% -3.00% 14.457 14.646 14.646 14.457
10+728.20 14.500 -3.00% -3.00% 14.473 14.662 14.662 14.473
10+729.60 14.515 -3.00% -3.00% 14.488 14.677 14.677 14.488
10+731.00 14.532 -3.00% -3.00% 14.505 14.694 14.694 14.505
10+732.40 14.548 -3.00% -3.00% 14.521 14.710 14.710 14.521
10+733.80 14.565 -3.00% -3.00% 14.538 14.727 14.727 14.538
10+735.20 14.582 -3.00% -3.00% 14.555 14.744 14.744 14.555
10+736.60 14.600 -3.00% -3.00% 14.573 14.762 14.762 14.573
10+738.00 14.618 -3.00% -3.00% 14.591 14.780 14.780 14.591
10+739.40 14.637 -3.00% -3.00% 14.610 14.799 14.799 14.610
10+740.80 14.656 -3.00% -3.00% 14.629 14.818 14.818 14.629
10+742.20 14.675 -3.00% -3.00% 14.648 14.837 14.837 14.648
10+743.60 14.695 -3.00% -3.00% 14.668 14.857 14.857 14.668
10+745.00 14.715 -3.00% -3.00% 14.688 14.877 14.877 14.688
10+746.40 14.735 -3.00% -3.00% 14.708 14.897 14.897 14.708
10+747.80 14.756 -3.00% -3.00% 14.729 14.918 14.918 14.729
10+749.20 14.777 -3.00% -3.00% 14.750 14.939 14.939 14.750
10+750.60 14.799 -3.00% -3.00% 14.772 14.961 14.961 14.772

256 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+752.00 14.821 -3.00% -3.00% 14.794 14.983 14.983 14.794


10+753.40 14.843 -3.00% -3.00% 14.816 15.005 15.005 14.816
10+754.80 14.866 -3.00% -3.00% 14.839 15.028 15.028 14.839
10+756.20 14.889 -3.00% -3.00% 14.862 15.051 15.051 14.862
10+757.60 14.913 -3.00% -3.00% 14.886 15.075 15.075 14.886
10+759.00 14.937 -3.00% -3.00% 14.910 15.099 15.099 14.910
10+760.40 14.961 -3.00% -3.00% 14.934 15.123 15.123 14.934
10+761.80 14.986 -3.00% -3.00% 14.959 15.148 15.148 14.959
10+763.20 15.011 -3.00% -3.00% 14.984 15.173 15.173 14.984
10+764.60 15.036 -3.00% -3.00% 15.009 15.198 15.198 15.009
10+766.00 15.062 -3.00% -3.00% 15.035 15.224 15.224 15.035
10+767.40 15.089 -3.00% -3.00% 15.062 15.251 15.251 15.062
10+768.80 15.115 -3.00% -3.00% 15.088 15.277 15.277 15.088
10+770.20 15.142 -3.00% -3.00% 15.115 15.304 15.304 15.115
10+771.60 15.170 -3.00% -3.00% 15.143 15.332 15.332 15.143
10+773.00 15.197 -3.00% -3.00% 15.170 15.359 15.359 15.170
10+774.40 15.226 -3.00% -3.00% 15.199 15.388 15.388 15.199
10+775.80 15.254 -3.00% -3.00% 15.227 15.416 15.416 15.227
10+777.20 15.283 -3.00% -3.00% 15.256 15.445 15.445 15.256
10+778.60 15.313 -3.00% -3.00% 15.286 15.475 15.475 15.286
10+780.00 15.342 -3.00% -3.00% 15.315 15.504 15.504 15.315
10+781.40 15.372 -3.00% -3.00% 15.345 15.534 15.534 15.345
10+782.80 15.403 -3.00% -3.00% 15.376 15.565 15.565 15.376
10+784.20 15.434 -3.00% -3.00% 15.407 15.596 15.596 15.407
10+785.60 15.465 -3.00% -3.00% 15.438 15.627 15.627 15.438
10+787.00 15.497 -3.00% -3.00% 15.470 15.659 15.659 15.470
10+788.40 15.529 -3.00% -3.00% 15.502 15.691 15.691 15.502
10+789.80 15.561 -3.00% -3.00% 15.534 15.723 15.723 15.534
10+791.20 15.594 -3.00% -3.00% 15.567 15.756 15.756 15.567
10+792.60 15.627 -3.00% -3.00% 15.600 15.789 15.789 15.600

257 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+794.00 15.661 -3.00% -3.00% 15.634 15.823 15.823 15.634


10+795.40 15.695 -3.00% -3.00% 15.668 15.857 15.857 15.668
10+796.80 15.730 -3.00% -3.00% 15.703 15.892 15.892 15.703
10+798.20 15.764 -3.00% -3.00% 15.737 15.926 15.926 15.737
10+799.60 15.799 -3.00% -3.00% 15.772 15.961 15.961 15.772
10+801.00 15.835 -3.00% -3.00% 15.808 15.997 15.997 15.808
10+802.40 15.871 -3.00% -3.00% 15.844 16.033 16.033 15.844
10+803.80 15.907 -3.00% -3.00% 15.880 16.069 16.069 15.880
10+805.20 15.944 -3.00% -3.00% 15.917 16.106 16.106 15.917
10+806.60 15.981 -3.00% -3.00% 15.954 16.143 16.143 15.954
10+808.00 16.019 -3.00% -3.00% 15.992 16.181 16.181 15.992
10+809.40 16.057 -3.00% -3.00% 16.030 16.219 16.219 16.030
10+810.80 16.095 -3.00% -3.00% 16.068 16.257 16.257 16.068
10+812.20 16.133 -3.00% -3.00% 16.106 16.295 16.295 16.106
10+813.60 16.172 -3.00% -3.00% 16.145 16.334 16.334 16.145
10+815.00 16.212 -3.00% -3.00% 16.185 16.374 16.374 16.185
10+816.40 16.252 -3.00% -3.00% 16.225 16.414 16.414 16.225
10+817.80 16.292 -3.00% -3.00% 16.265 16.454 16.454 16.265
10+819.20 16.333 -3.00% -3.00% 16.306 16.495 16.495 16.306
10+820.60 16.374 -3.00% -3.00% 16.347 16.536 16.536 16.347
10+822.00 16.415 -3.00% -3.00% 16.388 16.577 16.577 16.388
10+823.40 16.457 -3.00% -3.00% 16.430 16.619 16.619 16.430
10+824.80 16.499 -3.00% -3.00% 16.472 16.661 16.661 16.472
10+826.20 16.541 -3.00% -3.00% 16.514 16.703 16.703 16.514
10+827.60 16.584 -3.00% -3.00% 16.557 16.746 16.746 16.557
10+829.00 16.628 -3.00% -3.00% 16.601 16.790 16.790 16.601
10+830.40 16.671 -3.00% -3.00% 16.644 16.833 16.833 16.644
10+831.80 16.715 -3.00% -3.00% 16.688 16.877 16.877 16.688
10+833.20 16.760 -3.00% -3.00% 16.733 16.922 16.922 16.733
10+834.60 16.805 -3.00% -3.00% 16.778 16.967 16.967 16.778

258 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+836.00 16.850 -3.00% -3.00% 16.823 17.012 17.012 16.823


10+837.40 16.896 -3.00% -3.00% 16.869 17.058 17.058 16.869
10+838.80 16.942 -3.00% -3.00% 16.915 17.104 17.104 16.915
10+840.20 16.988 -3.00% -3.00% 16.961 17.150 17.150 16.961
10+841.60 17.035 -3.00% -3.00% 17.008 17.197 17.197 17.008
10+843.00 17.082 -3.00% -3.00% 17.055 17.244 17.244 17.055
10+844.40 17.129 -3.00% -3.00% 17.102 17.291 17.291 17.102
10+845.80 17.177 -3.00% -3.00% 17.150 17.339 17.339 17.150
10+847.20 17.226 -3.00% -3.00% 17.199 17.388 17.388 17.199
10+848.60 17.274 -3.00% -3.00% 17.247 17.436 17.436 17.247
10+850.00 17.324 -3.00% -3.00% 17.297 17.486 17.486 17.297
10+851.40 17.373 -3.00% -3.00% 17.346 17.535 17.535 17.346
10+852.80 17.423 -3.00% -3.00% 17.396 17.585 17.585 17.396
10+854.20 17.473 -3.00% -3.00% 17.446 17.635 17.635 17.446
10+855.60 17.524 -3.00% -3.00% 17.497 17.686 17.686 17.497
10+857.00 17.575 -3.00% -3.00% 17.548 17.737 17.737 17.548
10+858.40 17.626 -3.00% -3.00% 17.599 17.788 17.788 17.599
10+859.80 17.677 -3.00% -3.00% 17.650 17.839 17.839 17.650
10+861.20 17.729 -3.00% -3.00% 17.702 17.891 17.891 17.702
10+862.60 17.780 -3.00% -3.00% 17.753 17.942 17.942 17.753
10+864.00 17.831 -3.00% -3.00% 17.804 17.993 17.993 17.804
10+865.40 17.882 -3.00% -3.00% 17.855 18.044 18.044 17.855
10+866.80 17.934 -3.00% -3.00% 17.907 18.096 18.096 17.907
10+868.20 17.985 -3.00% -3.00% 17.958 18.147 18.147 17.958
10+869.60 18.036 -3.00% -3.00% 18.009 18.198 18.198 18.009
10+871.00 18.087 -3.00% -3.00% 18.060 18.249 18.249 18.060
10+872.40 18.138 -3.00% -3.00% 18.111 18.300 18.300 18.111
10+873.80 18.190 -3.00% -3.00% 18.163 18.352 18.352 18.163
10+875.20 18.241 -3.00% -3.00% 18.214 18.403 18.403 18.214
10+876.60 18.292 -3.00% -3.00% 18.265 18.454 18.454 18.265

259 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+878.00 18.343 -3.00% -3.00% 18.316 18.505 18.505 18.316


10+879.40 18.395 -3.00% -3.00% 18.368 18.557 18.557 18.368
10+880.80 18.446 -3.00% -3.00% 18.419 18.608 18.608 18.419
10+882.20 18.497 -3.00% -3.00% 18.470 18.659 18.659 18.470
10+883.60 18.548 -3.00% -3.00% 18.521 18.710 18.710 18.521
10+885.00 18.600 -3.00% -3.00% 18.573 18.762 18.762 18.573
10+886.40 18.651 -3.00% -3.00% 18.624 18.813 18.813 18.624
10+887.80 18.702 -3.00% -3.00% 18.675 18.864 18.864 18.675
10+889.20 18.753 -3.00% -3.00% 18.726 18.915 18.915 18.726
10+890.60 18.804 -3.00% -3.00% 18.777 18.966 18.966 18.777
10+892.00 18.856 -3.00% -3.00% 18.829 19.018 19.018 18.829
10+893.40 18.907 -3.00% -3.00% 18.880 19.069 19.069 18.880
10+894.80 18.958 -3.00% -3.00% 18.931 19.120 19.120 18.931
10+896.20 19.009 -3.00% -3.00% 18.982 19.171 19.171 18.982
10+897.60 19.061 -3.00% -3.00% 19.034 19.223 19.223 19.034
10+899.00 19.112 -3.00% -3.00% 19.085 19.274 19.274 19.085
10+900.40 19.163 -3.00% -3.00% 19.136 19.325 19.325 19.136
10+901.80 19.214 -3.00% -3.00% 19.187 19.376 19.376 19.187
10+903.20 19.265 -3.00% -3.00% 19.238 19.427 19.427 19.238
10+904.60 19.317 -3.00% -3.00% 19.290 19.479 19.479 19.290
10+906.00 19.368 -3.00% -3.00% 19.341 19.530 19.530 19.341
10+907.40 19.419 -3.00% -3.00% 19.392 19.581 19.581 19.392
10+908.80 19.470 -3.00% -3.00% 19.443 19.632 19.632 19.443
10+910.20 19.522 -3.00% -3.00% 19.495 19.684 19.684 19.495
10+911.60 19.573 -3.00% -3.00% 19.546 19.735 19.735 19.546
10+913.00 19.624 -3.00% -3.00% 19.597 19.786 19.786 19.597
10+914.40 19.675 -3.00% -3.00% 19.648 19.837 19.837 19.648
10+915.80 19.726 -3.00% -3.00% 19.699 19.888 19.888 19.699
10+917.20 19.778 -3.00% -3.00% 19.751 19.940 19.940 19.751
10+918.60 19.829 -3.00% -3.00% 19.802 19.991 19.991 19.802

260 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+920.00 19.880 -3.00% -3.00% 19.853 20.042 20.042 19.853


10+921.40 19.931 -3.00% -3.00% 19.904 20.093 20.093 19.904
10+922.80 19.983 -3.00% -3.00% 19.956 20.145 20.145 19.956
10+924.20 20.034 -3.00% -3.00% 20.007 20.196 20.196 20.007
10+925.60 20.085 -3.00% -3.00% 20.058 20.247 20.247 20.058
10+927.00 20.136 -3.00% -3.00% 20.109 20.298 20.298 20.109
10+928.40 20.187 -3.00% -3.00% 20.160 20.349 20.349 20.160
10+929.80 20.239 -3.00% -3.00% 20.212 20.401 20.401 20.212
10+931.20 20.290 -3.00% -3.00% 20.263 20.452 20.452 20.263
10+932.60 20.341 -3.00% -3.00% 20.314 20.503 20.503 20.314
10+934.00 20.392 -3.00% -3.00% 20.365 20.554 20.554 20.365
10+935.40 20.444 -3.00% -3.00% 20.417 20.606 20.606 20.417
10+936.80 20.495 -3.00% -3.00% 20.468 20.657 20.657 20.468
10+938.20 20.546 -3.00% -3.00% 20.519 20.708 20.708 20.519
10+939.60 20.597 -3.00% -3.00% 20.570 20.759 20.759 20.570
10+941.00 20.649 -3.00% -3.00% 20.622 20.811 20.811 20.622
10+942.40 20.700 -3.00% -3.00% 20.673 20.862 20.862 20.673
10+943.80 20.751 -3.00% -3.00% 20.724 20.913 20.913 20.724
10+945.20 20.802 -3.00% -3.00% 20.775 20.964 20.964 20.775
10+946.60 20.853 -3.00% -3.00% 20.826 21.015 21.015 20.826
10+948.00 20.905 -3.00% -3.00% 20.878 21.067 21.067 20.878
10+949.40 20.956 -3.00% -3.00% 20.929 21.118 21.118 20.929
10+950.80 21.007 -3.00% -3.00% 20.980 21.169 21.169 20.980
10+952.20 21.058 -3.00% -3.00% 21.031 21.220 21.220 21.031
10+953.60 21.110 -3.00% -3.00% 21.083 21.272 21.272 21.083
10+955.00 21.161 -3.00% -3.00% 21.134 21.323 21.323 21.134
10+956.40 21.212 -3.00% -3.00% 21.185 21.374 21.374 21.185
10+957.80 21.263 -3.00% -3.00% 21.236 21.425 21.425 21.236
10+959.20 21.314 -3.00% -3.00% 21.287 21.476 21.476 21.287
10+960.60 21.364 -3.00% -3.00% 21.337 21.526 21.526 21.337

261 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

10+962.00 21.414 -3.00% -3.00% 21.387 21.576 21.576 21.387


10+963.40 21.463 -3.00% -3.00% 21.436 21.625 21.625 21.436
10+964.80 21.512 -3.00% -3.00% 21.485 21.674 21.674 21.485
10+966.20 21.561 -3.00% -3.00% 21.534 21.723 21.723 21.534
10+967.60 21.609 -3.00% -3.00% 21.582 21.771 21.771 21.582
10+969.00 21.657 -3.00% -3.00% 21.630 21.819 21.819 21.630
10+970.40 21.704 -3.00% -3.00% 21.677 21.866 21.866 21.677
10+971.80 21.751 -3.00% -3.00% 21.724 21.913 21.913 21.724
10+973.20 21.798 -3.00% -3.00% 21.771 21.960 21.960 21.771
10+974.60 21.844 -3.00% -3.00% 21.817 22.006 22.006 21.817
10+976.00 21.890 -3.00% -3.00% 21.863 22.052 22.052 21.863
10+977.40 21.936 -3.00% -3.00% 21.909 22.098 22.098 21.909
10+978.80 21.981 -3.00% -3.00% 21.954 22.143 22.143 21.954
10+980.20 22.025 -3.00% -3.00% 21.998 22.187 22.187 21.998
10+981.60 22.070 -3.00% -3.00% 22.043 22.232 22.232 22.043
10+983.00 22.114 -3.00% -3.00% 22.087 22.276 22.276 22.087
10+984.40 22.157 -3.00% -3.00% 22.130 22.319 22.319 22.130
10+985.80 22.200 -3.00% -3.00% 22.173 22.362 22.362 22.173
10+987.20 22.243 -3.00% -3.00% 22.216 22.405 22.405 22.216
10+988.60 22.285 -3.00% -3.00% 22.258 22.447 22.447 22.258
10+990.00 22.327 -3.00% -3.00% 22.300 22.489 22.489 22.300
10+991.40 22.369 -3.00% -3.00% 22.342 22.531 22.531 22.342
10+992.80 22.410 -3.00% -3.00% 22.383 22.572 22.572 22.383
10+994.20 22.450 -3.00% -3.00% 22.423 22.612 22.612 22.423
10+995.60 22.491 -3.00% -3.00% 22.464 22.653 22.653 22.464
10+997.00 22.531 -3.00% -3.00% 22.504 22.693 22.693 22.504
10+998.40 22.570 -3.00% -3.00% 22.543 22.732 22.732 22.543
10+999.80 22.609 -3.00% -3.00% 22.582 22.771 22.771 22.582
11+001.20 22.648 -3.00% -3.00% 22.621 22.810 22.810 22.621
11+002.60 22.687 -3.00% -3.00% 22.660 22.849 22.849 22.660

262 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+004.00 22.725 -3.00% -3.00% 22.698 22.887 22.887 22.698


11+005.40 22.762 -3.00% -3.00% 22.735 22.924 22.924 22.735
11+006.80 22.799 -3.00% -3.00% 22.772 22.961 22.961 22.772
11+008.20 22.836 -3.00% -3.00% 22.809 22.998 22.998 22.809
11+009.60 22.873 -3.00% -3.00% 22.846 23.035 23.035 22.846
11+011.00 22.909 -3.00% -3.00% 22.882 23.071 23.071 22.882
11+012.40 22.944 -3.00% -3.00% 22.917 23.106 23.106 22.917
11+013.80 22.979 -3.00% -3.00% 22.952 23.141 23.141 22.952
11+015.20 23.014 -3.00% -3.00% 22.987 23.176 23.176 22.987
11+016.60 23.049 -3.00% -3.00% 23.022 23.211 23.211 23.022
11+018.00 23.083 -3.00% -3.00% 23.056 23.245 23.245 23.056
11+019.40 23.116 -3.00% -3.00% 23.089 23.278 23.278 23.089
11+020.80 23.149 -3.00% -3.00% 23.122 23.311 23.311 23.122
11+022.20 23.182 -3.00% -3.00% 23.155 23.344 23.344 23.155
11+023.60 23.215 -3.00% -3.00% 23.188 23.377 23.377 23.188
11+025.00 23.247 -3.00% -3.00% 23.220 23.409 23.409 23.220
11+026.40 23.279 -3.00% -3.00% 23.252 23.441 23.441 23.252
11+027.80 23.310 -3.00% -3.00% 23.283 23.472 23.472 23.283
11+029.20 23.341 -3.00% -3.00% 23.314 23.503 23.503 23.314
11+030.60 23.371 -3.00% -3.00% 23.344 23.533 23.533 23.344
11+032.00 23.401 -3.00% -3.00% 23.374 23.563 23.563 23.374
11+033.40 23.431 -3.00% -3.00% 23.404 23.593 23.593 23.404
11+034.80 23.460 -3.00% -3.00% 23.433 23.622 23.622 23.433
11+036.20 23.489 -3.00% -3.00% 23.462 23.651 23.651 23.462
11+037.60 23.518 -3.00% -3.00% 23.491 23.680 23.680 23.491
11+039.00 23.546 -3.00% -3.00% 23.519 23.708 23.708 23.519
11+040.40 23.573 -3.00% -3.00% 23.546 23.735 23.735 23.546
11+041.80 23.601 -3.00% -3.00% 23.574 23.763 23.763 23.574
11+043.20 23.628 -3.00% -3.00% 23.601 23.790 23.790 23.601
11+044.60 23.654 -3.00% -3.00% 23.627 23.816 23.816 23.627

263 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+046.00 23.680 -3.00% -3.00% 23.653 23.842 23.842 23.653


11+047.40 23.706 -3.00% -3.00% 23.679 23.868 23.868 23.679
11+048.80 23.731 -3.00% -3.00% 23.704 23.893 23.893 23.704
11+050.20 23.756 -3.00% -3.00% 23.729 23.918 23.918 23.729
11+051.60 23.781 -3.00% -3.00% 23.754 23.943 23.943 23.754
11+053.00 23.805 -3.00% -3.00% 23.778 23.967 23.967 23.778
11+054.40 23.829 -3.00% -3.00% 23.802 23.991 23.991 23.802
11+055.80 23.852 -3.00% -3.00% 23.825 24.014 24.014 23.825
11+057.20 23.875 -3.00% -3.00% 23.848 24.037 24.037 23.848
11+058.60 23.898 -3.00% -3.00% 23.871 24.060 24.060 23.871
11+060.00 23.920 -3.00% -3.00% 23.893 24.082 24.082 23.893
11+061.40 23.942 -3.00% -3.00% 23.915 24.104 24.104 23.915
11+062.80 23.963 -3.00% -3.00% 23.936 24.125 24.125 23.936
11+064.20 23.984 -3.00% -3.00% 23.957 24.146 24.146 23.957
11+065.60 24.005 -3.00% -3.00% 23.978 24.167 24.167 23.978
11+067.00 24.025 -3.00% -3.00% 23.998 24.187 24.187 23.998
11+068.40 24.045 -3.00% -3.00% 24.018 24.207 24.207 24.018
11+069.80 24.064 -3.00% -3.00% 24.037 24.226 24.226 24.037
11+071.20 24.083 -3.00% -3.00% 24.056 24.245 24.245 24.056
11+072.60 24.102 -3.00% -3.00% 24.075 24.264 24.264 24.075
11+074.00 24.120 -3.00% -3.00% 24.093 24.282 24.282 24.093
11+075.40 24.138 -3.00% -3.00% 24.111 24.300 24.300 24.111
11+076.80 24.155 -3.00% -3.00% 24.128 24.317 24.317 24.128
11+078.20 24.172 -3.00% -3.00% 24.145 24.334 24.334 24.145
11+079.60 24.189 -3.00% -3.00% 24.162 24.351 24.351 24.162
11+081.00 24.206 -3.00% -3.00% 24.179 24.368 24.368 24.179
11+082.40 24.222 -3.00% -3.00% 24.195 24.384 24.384 24.195
11+083.80 24.239 -3.00% -3.00% 24.212 24.401 24.401 24.212
11+085.20 24.256 -3.00% -3.00% 24.229 24.418 24.418 24.229
11+086.60 24.272 -3.00% -3.00% 24.245 24.434 24.434 24.245

264 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+088.00 24.289 -3.00% -3.00% 24.262 24.451 24.451 24.262


11+089.40 24.306 -3.00% -3.00% 24.279 24.468 24.468 24.279
11+090.80 24.322 -3.00% -3.00% 24.295 24.484 24.484 24.295
11+092.20 24.339 -3.00% -3.00% 24.312 24.501 24.501 24.312
11+093.60 24.355 -3.00% -3.00% 24.328 24.517 24.517 24.328
11+095.00 24.372 -3.00% -3.00% 24.345 24.534 24.534 24.345
11+096.40 24.389 -3.00% -3.00% 24.362 24.551 24.551 24.362
11+097.80 24.405 -3.00% -3.00% 24.378 24.567 24.567 24.378
11+099.20 24.422 -3.00% -3.00% 24.395 24.584 24.584 24.395
11+100.60 24.439 -3.00% -3.00% 24.412 24.601 24.601 24.412
11+102.00 24.455 -3.00% -3.00% 24.428 24.617 24.617 24.428
11+103.40 24.472 -3.00% -3.00% 24.445 24.634 24.634 24.445
11+104.80 24.488 -3.00% -3.00% 24.461 24.650 24.650 24.461
11+106.20 24.505 -3.00% -3.00% 24.478 24.667 24.667 24.478
11+107.60 24.522 -3.00% -3.00% 24.495 24.684 24.684 24.495
11+109.00 24.538 -3.00% -3.00% 24.511 24.700 24.700 24.511
11+110.40 24.555 -3.00% -3.00% 24.528 24.717 24.717 24.528
11+111.80 24.572 -3.00% -3.00% 24.545 24.734 24.734 24.545
11+113.20 24.588 -3.00% -3.00% 24.561 24.750 24.750 24.561
11+114.60 24.605 -3.00% -3.00% 24.578 24.767 24.767 24.578
11+116.00 24.622 -3.00% -3.00% 24.595 24.784 24.784 24.595
11+117.40 24.638 -3.00% -3.00% 24.611 24.800 24.800 24.611
11+118.80 24.655 -3.00% -3.00% 24.628 24.817 24.817 24.628
11+120.20 24.671 -3.00% -3.00% 24.644 24.833 24.833 24.644
11+121.60 24.688 -3.00% -3.00% 24.661 24.850 24.850 24.661
11+123.00 24.705 -3.00% -3.00% 24.678 24.867 24.867 24.678
11+124.40 24.721 -3.00% -3.00% 24.694 24.883 24.883 24.694
11+125.80 24.738 -3.00% -3.00% 24.711 24.900 24.900 24.711
11+127.20 24.755 -3.00% -3.00% 24.728 24.917 24.917 24.728
11+128.60 24.771 -3.00% -3.00% 24.744 24.933 24.933 24.744

265 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+130.00 24.788 -3.00% -3.00% 24.761 24.950 24.950 24.761


11+131.40 24.805 -3.00% -3.00% 24.778 24.967 24.967 24.778
11+132.80 24.821 -3.00% -3.00% 24.794 24.983 24.983 24.794
11+134.20 24.838 -3.00% -3.00% 24.811 25.000 25.000 24.811
11+135.60 24.854 -3.00% -3.00% 24.827 25.016 25.016 24.827
11+137.00 24.871 -3.00% -3.00% 24.844 25.033 25.033 24.844
11+138.40 24.888 -3.00% -3.00% 24.861 25.050 25.050 24.861
11+139.80 24.904 -3.00% -3.00% 24.877 25.066 25.066 24.877
11+141.20 24.921 -3.00% -3.00% 24.894 25.083 25.083 24.894
11+142.60 24.938 -3.00% -3.00% 24.911 25.100 25.100 24.911
11+144.00 24.954 -3.00% -3.00% 24.927 25.116 25.116 24.927
11+145.40 24.971 -3.00% -3.00% 24.944 25.133 25.133 24.944
11+146.80 24.987 -3.00% -3.00% 24.960 25.149 25.149 24.960
11+148.20 25.004 -3.00% -3.00% 24.977 25.166 25.166 24.977
11+149.60 25.021 -3.00% -3.00% 24.994 25.183 25.183 24.994
11+151.00 25.037 -3.00% -3.00% 25.010 25.199 25.199 25.010
11+152.40 25.054 -3.00% -3.00% 25.027 25.216 25.216 25.027
11+153.80 25.071 -3.00% -3.00% 25.044 25.233 25.233 25.044
11+155.20 25.087 -3.00% -3.00% 25.060 25.249 25.249 25.060
11+156.60 25.104 -3.00% -3.00% 25.077 25.266 25.266 25.077
11+158.00 25.121 -3.00% -3.00% 25.094 25.283 25.283 25.094
11+159.40 25.137 -3.00% -3.00% 25.110 25.299 25.299 25.110
11+160.80 25.154 -3.00% -3.00% 25.127 25.316 25.316 25.127
11+162.20 25.170 -3.00% -3.00% 25.143 25.332 25.332 25.143
11+163.60 25.187 -3.00% -3.00% 25.160 25.349 25.349 25.160
11+165.00 25.204 -3.00% -3.00% 25.177 25.366 25.366 25.177
11+166.40 25.220 -3.00% -3.00% 25.193 25.382 25.382 25.193
11+167.80 25.237 -3.00% -3.00% 25.210 25.399 25.399 25.210
11+169.20 25.254 -3.00% -3.00% 25.227 25.416 25.416 25.227
11+170.60 25.270 -3.00% -3.00% 25.243 25.432 25.432 25.243

266 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+172.00 25.287 -3.00% -3.00% 25.260 25.449 25.449 25.260


11+173.40 25.304 -3.00% -3.00% 25.277 25.466 25.466 25.277
11+174.80 25.320 -3.00% -3.00% 25.293 25.482 25.482 25.293
11+176.20 25.337 -3.00% -3.00% 25.310 25.499 25.499 25.310
11+177.60 25.353 -3.00% -3.00% 25.326 25.515 25.515 25.326
11+179.00 25.370 -3.00% -3.00% 25.343 25.532 25.532 25.343
11+180.40 25.387 -3.00% -3.00% 25.360 25.549 25.549 25.360
11+181.80 25.403 -3.00% -3.00% 25.376 25.565 25.565 25.376
11+183.20 25.420 -3.00% -3.00% 25.393 25.582 25.582 25.393
11+184.60 25.437 -3.00% -3.00% 25.410 25.599 25.599 25.410
11+186.00 25.453 -3.00% -3.00% 25.426 25.615 25.615 25.426
11+187.40 25.470 -3.00% -3.00% 25.443 25.632 25.632 25.443
11+188.80 25.486 -3.00% -3.00% 25.459 25.648 25.648 25.459
11+190.20 25.503 -3.00% -3.00% 25.476 25.665 25.665 25.476
11+191.60 25.520 -3.00% -3.00% 25.493 25.682 25.682 25.493
11+193.00 25.536 -3.00% -3.00% 25.509 25.698 25.698 25.509
11+194.40 25.553 -3.00% -3.00% 25.526 25.715 25.715 25.526
11+195.80 25.570 -3.00% -3.00% 25.543 25.732 25.732 25.543
11+197.20 25.586 -3.00% -3.00% 25.559 25.748 25.748 25.559
11+198.60 25.603 -3.00% -3.00% 25.576 25.765 25.765 25.576
11+200.00 25.620 -3.00% -3.00% 25.593 25.782 25.782 25.593
11+201.40 25.636 -3.00% -3.00% 25.609 25.798 25.798 25.609
11+202.80 25.653 -3.00% -3.00% 25.626 25.815 25.815 25.626
11+204.20 25.669 -3.00% -3.00% 25.642 25.831 25.831 25.642
11+205.60 25.686 -3.00% -3.00% 25.659 25.848 25.848 25.659
11+207.00 25.703 -3.00% -3.00% 25.676 25.865 25.865 25.676
11+208.40 25.719 -3.00% -3.00% 25.692 25.881 25.881 25.692
11+209.80 25.736 -3.00% -3.00% 25.709 25.898 25.898 25.709
11+211.20 25.753 -3.00% -3.00% 25.726 25.915 25.915 25.726
11+212.60 25.769 -3.00% -3.00% 25.742 25.931 25.931 25.742

267 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+214.00 25.786 -3.00% -3.00% 25.759 25.948 25.948 25.759


11+215.40 25.803 -3.00% -3.00% 25.776 25.965 25.965 25.776
11+216.80 25.819 -3.00% -3.00% 25.792 25.981 25.981 25.792
11+218.20 25.836 -3.00% -3.00% 25.809 25.998 25.998 25.809
11+219.60 25.852 -3.00% -3.00% 25.825 26.014 26.014 25.825
11+221.00 25.869 -3.00% -3.00% 25.842 26.031 26.031 25.842
11+222.40 25.886 -3.00% -3.00% 25.859 26.048 26.048 25.859
11+223.80 25.902 -3.00% -3.00% 25.875 26.064 26.064 25.875
11+225.20 25.919 -3.00% -3.00% 25.892 26.081 26.081 25.892
11+226.60 25.936 -3.00% -3.00% 25.909 26.098 26.098 25.909
11+228.00 25.952 -3.00% -3.00% 25.925 26.114 26.114 25.925
11+229.40 25.969 -3.00% -3.00% 25.942 26.131 26.131 25.942
11+230.80 25.985 -3.00% -3.00% 25.958 26.147 26.147 25.958
11+232.20 26.002 -3.00% -3.00% 25.975 26.164 26.164 25.975
11+233.60 26.019 -3.00% -3.00% 25.992 26.181 26.181 25.992
11+235.00 26.035 -3.00% -3.00% 26.008 26.197 26.197 26.008
11+236.40 26.052 -3.00% -3.00% 26.025 26.214 26.214 26.025
11+237.80 26.069 -3.00% -3.00% 26.042 26.231 26.231 26.042
11+239.20 26.085 -3.00% -3.00% 26.058 26.247 26.247 26.058
11+240.60 26.102 -3.00% -3.00% 26.075 26.264 26.264 26.075
11+242.00 26.119 -3.00% -3.00% 26.092 26.281 26.281 26.092
11+243.40 26.135 -3.00% -3.00% 26.108 26.297 26.297 26.108
11+244.80 26.152 -3.00% -3.00% 26.125 26.314 26.314 26.125
11+246.20 26.168 -3.00% -3.00% 26.141 26.330 26.330 26.141
11+247.60 26.185 -3.00% -3.00% 26.158 26.347 26.347 26.158
11+249.00 26.202 -3.00% -3.00% 26.175 26.364 26.364 26.175
11+250.40 26.218 -3.00% -3.00% 26.191 26.380 26.380 26.191
11+251.80 26.235 -3.00% -3.00% 26.208 26.397 26.397 26.208
11+253.20 26.252 -3.00% -3.00% 26.225 26.414 26.414 26.225
11+254.60 26.268 -3.00% -3.00% 26.241 26.430 26.430 26.241

268 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+256.00 26.285 -3.00% -3.00% 26.258 26.447 26.447 26.258


11+257.40 26.302 -3.00% -3.00% 26.275 26.464 26.464 26.275
11+258.80 26.318 -3.00% -3.00% 26.291 26.480 26.480 26.291
11+260.20 26.335 -3.00% -3.00% 26.308 26.497 26.497 26.308
11+261.60 26.351 -3.00% -3.00% 26.324 26.513 26.513 26.324
11+263.00 26.368 -3.00% -3.00% 26.341 26.530 26.530 26.341
11+264.40 26.385 -3.00% -3.00% 26.358 26.547 26.547 26.358
11+265.80 26.401 -3.00% -3.00% 26.374 26.563 26.563 26.374
11+267.20 26.418 -3.00% -3.00% 26.391 26.580 26.580 26.391
11+268.60 26.435 -3.00% -3.00% 26.408 26.597 26.597 26.408
11+270.00 26.451 -3.00% -3.00% 26.424 26.613 26.613 26.424
11+271.40 26.468 -3.00% -3.00% 26.441 26.630 26.630 26.441
11+272.80 26.484 -3.00% -3.00% 26.457 26.646 26.646 26.457
11+274.20 26.501 -3.00% -3.00% 26.474 26.663 26.663 26.474
11+275.60 26.518 -3.00% -3.00% 26.491 26.680 26.680 26.491
11+277.00 26.534 -3.00% -3.00% 26.507 26.696 26.696 26.507
11+278.40 26.551 -3.00% -3.00% 26.524 26.713 26.713 26.524
11+279.80 26.568 -3.00% -3.00% 26.541 26.730 26.730 26.541
11+281.20 26.584 -3.00% -3.00% 26.557 26.746 26.746 26.557
11+282.60 26.601 -3.00% -3.00% 26.574 26.763 26.763 26.574
11+284.00 26.618 -3.00% -3.00% 26.591 26.780 26.780 26.591
11+285.40 26.634 -3.00% -3.00% 26.607 26.796 26.796 26.607
11+286.80 26.651 -3.00% -3.00% 26.624 26.813 26.813 26.624
11+288.20 26.667 -3.00% -3.00% 26.640 26.829 26.829 26.640
11+289.60 26.684 -3.00% -3.00% 26.657 26.846 26.846 26.657
11+291.00 26.701 -3.00% -3.00% 26.674 26.863 26.863 26.674
11+292.40 26.717 -3.00% -3.00% 26.690 26.879 26.879 26.690
11+293.80 26.734 -3.00% -3.00% 26.707 26.896 26.896 26.707
11+295.20 26.751 -3.00% -3.00% 26.724 26.913 26.913 26.724
11+296.60 26.767 -3.00% -3.00% 26.740 26.929 26.929 26.740

269 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+298.00 26.784 -3.00% -3.00% 26.757 26.946 26.946 26.757


11+299.40 26.801 -3.00% -3.00% 26.774 26.963 26.963 26.774
11+300.80 26.817 -3.00% -3.00% 26.790 26.979 26.979 26.790
11+302.20 26.834 -3.00% -3.00% 26.807 26.996 26.996 26.807
11+303.60 26.850 -3.00% -3.00% 26.823 27.012 27.012 26.823
11+305.00 26.867 -3.00% -3.00% 26.840 27.029 27.029 26.840
11+306.40 26.884 -3.00% -3.00% 26.857 27.046 27.046 26.857
11+307.80 26.900 -3.00% -3.00% 26.873 27.062 27.062 26.873
11+309.20 26.917 -3.00% -3.00% 26.890 27.079 27.079 26.890
11+310.60 26.934 -3.00% -3.00% 26.907 27.096 27.096 26.907
11+312.00 26.950 -3.00% -3.00% 26.923 27.112 27.112 26.923
11+313.40 26.967 -3.00% -3.00% 26.940 27.129 27.129 26.940
11+314.80 26.983 -3.00% -3.00% 26.956 27.145 27.145 26.956
11+316.20 27.000 -3.00% -3.00% 26.973 27.162 27.162 26.973
11+317.60 27.017 -3.00% -3.00% 26.990 27.179 27.179 26.990
11+319.00 27.033 -3.00% -3.00% 27.006 27.195 27.195 27.006
11+320.40 27.050 -3.00% -3.00% 27.023 27.212 27.212 27.023
11+321.80 27.067 -3.00% -3.00% 27.040 27.229 27.229 27.040
11+323.20 27.083 -3.00% -3.00% 27.056 27.245 27.245 27.056
11+324.60 27.100 -3.00% -3.00% 27.073 27.262 27.262 27.073
11+326.00 27.117 -3.00% -3.00% 27.090 27.279 27.279 27.090
11+327.40 27.133 -3.00% -3.00% 27.106 27.295 27.295 27.106
11+328.80 27.150 -3.00% -3.00% 27.123 27.312 27.312 27.123
11+330.20 27.166 -3.00% -3.00% 27.139 27.328 27.328 27.139
11+331.60 27.183 -3.00% -3.00% 27.156 27.345 27.345 27.156
11+333.00 27.200 -3.00% -3.00% 27.173 27.362 27.362 27.173
11+334.40 27.216 -3.00% -3.00% 27.189 27.378 27.378 27.189
11+335.80 27.233 -3.00% -3.00% 27.206 27.395 27.395 27.206
11+337.20 27.250 -3.00% -3.00% 27.223 27.412 27.412 27.223
11+338.60 27.266 -3.00% -3.00% 27.239 27.428 27.428 27.239

270 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+340.00 27.283 -3.00% -3.00% 27.256 27.445 27.445 27.256


11+341.40 27.299 -3.00% -3.00% 27.272 27.461 27.461 27.272
11+342.80 27.316 -3.00% -3.00% 27.289 27.478 27.478 27.289
11+344.20 27.333 -3.00% -3.00% 27.306 27.495 27.495 27.306
11+345.60 27.349 -3.00% -3.00% 27.322 27.511 27.511 27.322
11+347.00 27.366 -3.00% -3.00% 27.339 27.528 27.528 27.339
11+348.40 27.383 -3.00% -3.00% 27.356 27.545 27.545 27.356
11+349.80 27.399 -3.00% -3.00% 27.372 27.561 27.561 27.372
11+351.20 27.416 -3.00% -3.00% 27.389 27.578 27.578 27.389
11+352.60 27.433 -3.00% -3.00% 27.406 27.595 27.595 27.406
11+354.00 27.449 -3.00% -3.00% 27.422 27.611 27.611 27.422
11+355.40 27.466 -3.00% -3.00% 27.439 27.628 27.628 27.439
11+356.80 27.482 -3.00% -3.00% 27.455 27.644 27.644 27.455
11+358.20 27.499 -3.00% -3.00% 27.472 27.661 27.661 27.472
11+359.60 27.516 -3.00% -3.00% 27.489 27.678 27.678 27.489
11+361.00 27.532 -3.00% -3.00% 27.505 27.694 27.694 27.505
11+362.40 27.549 -3.00% -3.00% 27.522 27.711 27.711 27.522
11+363.80 27.566 -3.00% -3.00% 27.539 27.728 27.728 27.539
11+365.20 27.582 -3.00% -3.00% 27.555 27.744 27.744 27.555
11+366.60 27.599 -3.00% -3.00% 27.572 27.761 27.761 27.572
11+368.00 27.616 -3.00% -3.00% 27.589 27.778 27.778 27.589
11+369.40 27.632 -3.00% -3.00% 27.605 27.794 27.794 27.605
11+370.80 27.649 -3.00% -3.00% 27.622 27.811 27.811 27.622
11+372.20 27.665 -3.00% -3.00% 27.638 27.827 27.827 27.638
11+373.60 27.682 -3.00% -3.00% 27.655 27.844 27.844 27.655
11+375.00 27.699 -3.00% -3.00% 27.672 27.861 27.861 27.672
11+376.40 27.715 -3.00% -3.00% 27.688 27.877 27.877 27.688
11+377.80 27.732 -3.00% -3.00% 27.705 27.894 27.894 27.705
11+379.20 27.749 -3.00% -3.00% 27.722 27.911 27.911 27.722
11+380.60 27.765 -3.00% -3.00% 27.738 27.927 27.927 27.738

271 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+382.00 27.782 -3.00% -3.00% 27.755 27.944 27.944 27.755


11+383.40 27.798 -3.00% -3.00% 27.771 27.960 27.960 27.771
11+384.80 27.815 -3.00% -3.00% 27.788 27.977 27.977 27.788
11+386.20 27.832 -3.00% -3.00% 27.805 27.994 27.994 27.805
11+387.60 27.848 -3.00% -3.00% 27.821 28.010 28.010 27.821
11+389.00 27.865 -3.00% -3.00% 27.838 28.027 28.027 27.838
11+390.40 27.882 -3.00% -3.00% 27.855 28.044 28.044 27.855
11+391.80 27.898 -3.00% -3.00% 27.871 28.060 28.060 27.871
11+393.20 27.915 -3.00% -3.00% 27.888 28.077 28.077 27.888
11+394.60 27.932 -3.00% -3.00% 27.905 28.094 28.094 27.905
11+396.00 27.948 -3.00% -3.00% 27.921 28.110 28.110 27.921
11+397.40 27.965 -3.00% -3.00% 27.938 28.127 28.127 27.938
11+398.80 27.981 -3.00% -3.00% 27.954 28.143 28.143 27.954
11+400.20 27.998 -3.00% -3.00% 27.971 28.160 28.160 27.971
11+401.60 28.015 -3.00% -3.00% 27.988 28.177 28.177 27.988
11+403.00 28.031 -3.00% -3.00% 28.004 28.193 28.193 28.004
11+404.40 28.048 -3.00% -3.00% 28.021 28.210 28.210 28.021
11+405.80 28.065 -3.00% -3.00% 28.038 28.227 28.227 28.038
11+407.20 28.081 -3.00% -3.00% 28.054 28.243 28.243 28.054
11+408.60 28.098 -3.00% -3.00% 28.071 28.260 28.260 28.071
11+410.00 28.115 -3.00% -3.00% 28.088 28.277 28.277 28.088
11+411.40 28.131 -3.00% -3.00% 28.104 28.293 28.293 28.104
11+412.80 28.148 -3.00% -3.00% 28.121 28.310 28.310 28.121
11+414.20 28.164 -3.00% -3.00% 28.137 28.326 28.326 28.137
11+415.60 28.181 -3.00% -3.00% 28.154 28.343 28.343 28.154
11+417.00 28.198 -3.00% -3.00% 28.171 28.360 28.360 28.171
11+418.40 28.214 -3.00% -3.00% 28.187 28.376 28.376 28.187
11+419.80 28.231 -3.00% -3.00% 28.204 28.393 28.393 28.204
11+421.20 28.248 -3.00% -3.00% 28.221 28.410 28.410 28.221
11+422.60 28.264 -3.00% -3.00% 28.237 28.426 28.426 28.237

272 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+424.00 28.281 -3.00% -3.00% 28.254 28.443 28.443 28.254


11+425.40 28.297 -3.00% -3.00% 28.270 28.459 28.459 28.270
11+426.80 28.314 -3.00% -3.00% 28.287 28.476 28.476 28.287
11+428.20 28.331 -3.00% -3.00% 28.304 28.493 28.493 28.304
11+429.60 28.347 -3.00% -3.00% 28.320 28.509 28.509 28.320
11+431.00 28.364 -3.00% -3.00% 28.337 28.526 28.526 28.337
11+432.40 28.381 -3.00% -3.00% 28.354 28.543 28.543 28.354
11+433.80 28.397 -3.00% -3.00% 28.370 28.559 28.559 28.370
11+435.20 28.414 -3.00% -3.00% 28.387 28.576 28.576 28.387
11+436.60 28.431 -3.00% -3.00% 28.404 28.593 28.593 28.404
11+438.00 28.447 -3.00% -3.00% 28.420 28.609 28.609 28.420
11+439.40 28.464 -3.00% -3.00% 28.437 28.626 28.626 28.437
11+440.80 28.480 -3.00% -3.00% 28.453 28.642 28.642 28.453
11+442.20 28.497 -3.00% -3.00% 28.470 28.659 28.659 28.470
11+443.60 28.514 -3.00% -3.00% 28.487 28.676 28.676 28.487
11+445.00 28.530 -3.00% -3.00% 28.503 28.692 28.692 28.503
11+446.40 28.547 -3.00% -3.00% 28.520 28.709 28.709 28.520
11+447.80 28.564 -3.00% -3.00% 28.537 28.726 28.726 28.537
11+449.20 28.580 -3.00% -3.00% 28.553 28.742 28.742 28.553
11+450.60 28.597 -3.00% -3.00% 28.570 28.759 28.759 28.570
11+452.00 28.614 -3.00% -3.00% 28.587 28.776 28.776 28.587
11+453.40 28.630 -3.00% -3.00% 28.603 28.792 28.792 28.603
11+454.80 28.647 -3.00% -3.00% 28.620 28.809 28.809 28.620
11+456.20 28.663 -3.00% -3.00% 28.636 28.825 28.825 28.636
11+457.60 28.680 -3.00% -3.00% 28.653 28.842 28.842 28.653
11+459.00 28.697 -3.00% -3.00% 28.670 28.859 28.859 28.670
11+460.40 28.713 -3.00% -3.00% 28.686 28.875 28.875 28.686
11+461.80 28.730 -3.00% -3.00% 28.703 28.892 28.892 28.703
11+463.20 28.747 -3.00% -3.00% 28.720 28.909 28.909 28.720
11+464.60 28.763 -3.00% -3.00% 28.736 28.925 28.925 28.736

273 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+466.00 28.780 -3.00% -3.00% 28.753 28.942 28.942 28.753


11+467.40 28.796 -3.00% -3.00% 28.769 28.958 28.958 28.769
11+468.80 28.813 -3.00% -3.00% 28.786 28.975 28.975 28.786
11+470.20 28.830 -3.00% -3.00% 28.803 28.992 28.992 28.803
11+471.60 28.846 -3.00% -3.00% 28.819 29.008 29.008 28.819
11+473.00 28.863 -3.00% -3.00% 28.836 29.025 29.025 28.836
11+474.40 28.880 -3.00% -3.00% 28.853 29.042 29.042 28.853
11+475.80 28.896 -3.00% -3.00% 28.869 29.058 29.058 28.869
11+477.20 28.913 -3.00% -3.00% 28.886 29.075 29.075 28.886
11+478.60 28.930 -3.00% -3.00% 28.903 29.092 29.092 28.903
11+480.00 28.946 -3.00% -3.00% 28.919 29.108 29.108 28.919
11+481.40 28.963 -3.00% -3.00% 28.936 29.125 29.125 28.936
11+482.80 28.980 -3.00% -3.00% 28.953 29.142 29.142 28.953
11+484.20 28.998 -3.00% -3.00% 28.971 29.160 29.160 28.971
11+485.60 29.015 -3.00% -3.00% 28.988 29.177 29.177 28.988
11+487.00 29.033 -3.00% -3.00% 29.006 29.195 29.195 29.006
11+488.40 29.052 -3.00% -3.00% 29.025 29.214 29.214 29.025
11+489.80 29.070 -3.00% -3.00% 29.043 29.232 29.232 29.043
11+491.20 29.089 -3.00% -3.00% 29.062 29.251 29.251 29.062
11+492.60 29.108 -3.00% -3.00% 29.081 29.270 29.270 29.081
11+494.00 29.127 -3.00% -3.00% 29.100 29.289 29.289 29.100
11+495.40 29.147 -3.00% -3.00% 29.120 29.309 29.309 29.120
11+496.80 29.167 -3.00% -3.00% 29.140 29.329 29.329 29.140
11+498.20 29.187 -3.00% -3.00% 29.160 29.349 29.349 29.160
11+499.60 29.208 -3.00% -3.00% 29.181 29.370 29.370 29.181
11+501.00 29.229 -3.00% -3.00% 29.202 29.391 29.391 29.202
11+502.40 29.250 -3.00% -3.00% 29.223 29.412 29.412 29.223
11+503.80 29.271 -3.00% -3.00% 29.244 29.433 29.433 29.244
11+505.20 29.293 -3.00% -3.00% 29.266 29.455 29.455 29.266
11+506.60 29.314 -3.00% -3.00% 29.287 29.476 29.476 29.287

274 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+508.00 29.337 -3.00% -3.00% 29.310 29.499 29.499 29.310


11+509.40 29.359 -3.00% -3.00% 29.332 29.521 29.521 29.332
11+510.80 29.382 -3.00% -3.00% 29.355 29.544 29.544 29.355
11+512.20 29.405 -3.00% -3.00% 29.378 29.567 29.567 29.378
11+513.60 29.428 -3.00% -3.00% 29.401 29.590 29.590 29.401
11+515.00 29.452 -3.00% -3.00% 29.425 29.614 29.614 29.425
11+516.40 29.475 -3.00% -3.00% 29.448 29.637 29.637 29.448
11+517.80 29.500 -3.00% -3.00% 29.473 29.662 29.662 29.473
11+519.20 29.524 -3.00% -3.00% 29.497 29.686 29.686 29.497
11+520.60 29.549 -3.00% -3.00% 29.522 29.711 29.711 29.522
11+522.00 29.574 -3.00% -3.00% 29.547 29.736 29.736 29.547
11+523.40 29.599 -3.00% -3.00% 29.572 29.761 29.761 29.572
11+524.80 29.624 -3.00% -3.00% 29.597 29.786 29.786 29.597
11+526.20 29.650 -3.00% -3.00% 29.623 29.812 29.812 29.623
11+527.60 29.676 -3.00% -3.00% 29.649 29.838 29.838 29.649
11+529.00 29.703 -3.00% -3.00% 29.676 29.865 29.865 29.676
11+530.40 29.729 -3.00% -3.00% 29.702 29.891 29.891 29.702
11+531.80 29.756 -3.00% -3.00% 29.729 29.918 29.918 29.729
11+533.20 29.783 -3.00% -3.00% 29.756 29.945 29.945 29.756
11+534.60 29.811 -3.00% -3.00% 29.784 29.973 29.973 29.784
11+536.00 29.838 -3.00% -3.00% 29.811 30.000 30.000 29.811
11+537.40 29.866 -3.00% -3.00% 29.839 30.028 30.028 29.839
11+538.80 29.895 -3.00% -3.00% 29.868 30.057 30.057 29.868
11+540.20 29.923 -3.00% -3.00% 29.896 30.085 30.085 29.896
11+541.60 29.952 -3.00% -3.00% 29.925 30.114 30.114 29.925
11+543.00 29.981 -3.00% -3.00% 29.954 30.143 30.143 29.954
11+544.40 30.011 -3.00% -3.00% 29.984 30.173 30.173 29.984
11+545.80 30.040 -3.00% -3.00% 30.013 30.202 30.202 30.013
11+547.20 30.070 -3.00% -3.00% 30.043 30.232 30.232 30.043
11+548.60 30.101 -3.00% -3.00% 30.074 30.263 30.263 30.074

275 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+550.00 30.131 -3.00% -3.00% 30.104 30.293 30.293 30.104


11+551.40 30.162 -3.00% -3.00% 30.135 30.324 30.324 30.135
11+552.80 30.193 -3.00% -3.00% 30.166 30.355 30.355 30.166
11+554.20 30.224 -3.00% -3.00% 30.197 30.386 30.386 30.197
11+555.60 30.256 -3.00% -3.00% 30.229 30.418 30.418 30.229
11+557.00 30.288 -3.00% -3.00% 30.261 30.450 30.450 30.261
11+558.40 30.320 -3.00% -3.00% 30.293 30.482 30.482 30.293
11+559.80 30.353 -3.00% -3.00% 30.326 30.515 30.515 30.326
11+561.20 30.385 -3.00% -3.00% 30.358 30.547 30.547 30.358
11+562.60 30.418 -3.00% -3.00% 30.391 30.580 30.580 30.391
11+564.00 30.452 -3.00% -3.00% 30.425 30.614 30.614 30.425
11+565.40 30.485 -3.00% -3.00% 30.458 30.647 30.647 30.458
11+566.80 30.519 -3.00% -3.00% 30.492 30.681 30.681 30.492
11+568.20 30.553 -3.00% -3.00% 30.526 30.715 30.715 30.526
11+569.60 30.588 -3.00% -3.00% 30.561 30.750 30.750 30.561
11+571.00 30.623 -3.00% -3.00% 30.596 30.785 30.785 30.596
11+572.40 30.658 -3.00% -3.00% 30.631 30.820 30.820 30.631
11+573.80 30.693 -3.00% -3.00% 30.666 30.855 30.855 30.666
11+575.20 30.728 -3.00% -3.00% 30.701 30.890 30.890 30.701
11+576.60 30.764 -3.00% -3.00% 30.737 30.926 30.926 30.737
11+578.00 30.800 -3.00% -3.00% 30.773 30.962 30.962 30.773
11+579.40 30.837 -3.00% -3.00% 30.810 30.999 30.999 30.810
11+580.80 30.873 -3.00% -3.00% 30.846 31.035 31.035 30.846
11+582.20 30.910 -3.00% -3.00% 30.883 31.072 31.072 30.883
11+583.60 30.948 -3.00% -3.00% 30.921 31.110 31.110 30.921
11+585.00 30.985 -3.00% -3.00% 30.958 31.147 31.147 30.958
11+586.40 31.023 -3.00% -3.00% 30.996 31.185 31.185 30.996
11+587.80 31.061 -3.00% -3.00% 31.034 31.223 31.223 31.034
11+589.20 31.099 -3.00% -3.00% 31.072 31.261 31.261 31.072
11+590.60 31.138 -3.00% -3.00% 31.111 31.300 31.300 31.111

276 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+592.00 31.177 -3.00% -3.00% 31.150 31.339 31.339 31.150


11+593.40 31.216 -3.00% -3.00% 31.189 31.378 31.378 31.189
11+594.80 31.255 -3.00% -3.00% 31.228 31.417 31.417 31.228
11+596.20 31.295 -3.00% -3.00% 31.268 31.457 31.457 31.268
11+597.60 31.335 -3.00% -3.00% 31.308 31.497 31.497 31.308
11+599.00 31.375 -3.00% -3.00% 31.348 31.537 31.537 31.348
11+600.40 31.416 -3.00% -3.00% 31.389 31.578 31.578 31.389
11+601.80 31.457 -3.00% -3.00% 31.430 31.619 31.619 31.430
11+603.20 31.498 -3.00% -3.00% 31.471 31.660 31.660 31.471
11+604.60 31.539 -3.00% -3.00% 31.512 31.701 31.701 31.512
11+606.00 31.581 -3.00% -3.00% 31.554 31.743 31.743 31.554
11+607.40 31.623 -3.00% -3.00% 31.596 31.785 31.785 31.596
11+608.80 31.665 -3.00% -3.00% 31.638 31.827 31.827 31.638
11+610.20 31.708 -3.00% -3.00% 31.681 31.870 31.870 31.681
11+611.60 31.750 -3.00% -3.00% 31.723 31.912 31.912 31.723
11+613.00 31.793 -3.00% -3.00% 31.766 31.955 31.955 31.766
11+614.40 31.836 -3.00% -3.00% 31.809 31.998 31.998 31.809
11+615.80 31.879 -3.00% -3.00% 31.852 32.041 32.041 31.852
11+617.20 31.922 -3.00% -3.00% 31.895 32.084 32.084 31.895
11+618.60 31.965 -3.00% -3.00% 31.938 32.127 32.127 31.938
11+620.00 32.008 -3.00% -3.00% 31.981 32.170 32.170 31.981
11+621.40 32.051 -3.00% -3.00% 32.024 32.213 32.213 32.024
11+622.80 32.094 -3.00% -3.00% 32.067 32.256 32.256 32.067
11+624.20 32.137 -3.00% -3.00% 32.110 32.299 32.299 32.110
11+625.60 32.180 -3.00% -3.00% 32.153 32.342 32.342 32.153
11+627.00 32.223 -3.00% -3.00% 32.196 32.385 32.385 32.196
11+628.40 32.266 -3.00% -3.00% 32.239 32.428 32.428 32.239
11+629.80 32.309 -3.00% -3.00% 32.282 32.471 32.471 32.282
11+631.20 32.352 -3.00% -3.00% 32.325 32.514 32.514 32.325
11+632.60 32.394 -3.00% -3.00% 32.367 32.556 32.556 32.367

277 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+634.00 32.437 -3.00% -3.00% 32.410 32.599 32.599 32.410


11+635.40 32.480 -3.00% -3.00% 32.453 32.642 32.642 32.453
11+636.80 32.522 -3.00% -3.00% 32.495 32.684 32.684 32.495
11+638.20 32.563 -3.00% -3.00% 32.536 32.725 32.725 32.536
11+639.60 32.604 -3.00% -3.00% 32.577 32.766 32.766 32.577
11+641.00 32.644 -3.00% -3.00% 32.617 32.806 32.806 32.617
11+642.40 32.683 -3.00% -3.00% 32.656 32.845 32.845 32.656
11+643.80 32.722 -3.00% -3.00% 32.695 32.884 32.884 32.695
11+645.20 32.760 -3.00% -3.00% 32.733 32.922 32.922 32.733
11+646.60 32.798 -3.00% -3.00% 32.771 32.960 32.960 32.771
11+648.00 32.835 -3.00% -3.00% 32.808 32.997 32.997 32.808
11+649.40 32.871 -3.00% -3.00% 32.844 33.033 33.033 32.844
11+650.80 32.906 -3.00% -3.00% 32.879 33.068 33.068 32.879
11+652.20 32.941 -3.00% -3.00% 32.914 33.103 33.103 32.914
11+653.60 32.976 -3.00% -3.00% 32.949 33.138 33.138 32.949
11+655.00 33.009 -3.00% -3.00% 32.982 33.171 33.171 32.982
11+656.40 33.042 -3.00% -3.00% 33.015 33.204 33.204 33.015
11+657.80 33.075 -3.00% -3.00% 33.048 33.237 33.237 33.048
11+659.20 33.107 -3.00% -3.00% 33.080 33.269 33.269 33.080
11+660.60 33.138 -3.00% -3.00% 33.111 33.300 33.300 33.111
11+662.00 33.168 -3.00% -3.00% 33.141 33.330 33.330 33.141
11+663.40 33.198 -3.00% -3.00% 33.171 33.360 33.360 33.171
11+664.80 33.227 -3.00% -3.00% 33.200 33.389 33.389 33.200
11+666.20 33.256 -3.00% -3.00% 33.229 33.418 33.418 33.229
11+667.60 33.284 -3.00% -3.00% 33.257 33.446 33.446 33.257
11+669.00 33.311 -3.00% -3.00% 33.284 33.473 33.473 33.284
11+670.40 33.338 -3.00% -3.00% 33.311 33.500 33.500 33.311
11+671.80 33.364 -3.00% -3.00% 33.337 33.526 33.526 33.337
11+673.20 33.389 -3.00% -3.00% 33.362 33.551 33.551 33.362
11+674.60 33.414 -3.00% -3.00% 33.387 33.576 33.576 33.387

278 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+676.00 33.438 -3.00% -3.00% 33.411 33.600 33.600 33.411


11+677.40 33.462 -3.00% -3.00% 33.435 33.624 33.624 33.435
11+678.80 33.485 -3.00% -3.00% 33.458 33.647 33.647 33.458
11+680.20 33.507 -3.00% -3.00% 33.480 33.669 33.669 33.480
11+681.60 33.529 -3.00% -3.00% 33.502 33.691 33.691 33.502
11+683.00 33.550 -3.00% -3.00% 33.523 33.712 33.712 33.523
11+684.40 33.570 -3.00% -3.00% 33.543 33.732 33.732 33.543
11+685.80 33.590 -3.00% -3.00% 33.563 33.752 33.752 33.563
11+687.20 33.609 -3.00% -3.00% 33.582 33.771 33.771 33.582
11+688.60 33.627 -3.00% -3.00% 33.600 33.789 33.789 33.600
11+690.00 33.645 -3.00% -3.00% 33.618 33.807 33.807 33.618
11+691.40 33.662 -3.00% -3.00% 33.635 33.824 33.824 33.635
11+692.80 33.679 -3.00% -3.00% 33.652 33.841 33.841 33.652
11+694.20 33.695 -3.00% -3.00% 33.668 33.857 33.857 33.668
11+695.60 33.710 -3.00% -3.00% 33.683 33.872 33.872 33.683
11+697.00 33.725 -3.00% -3.00% 33.698 33.887 33.887 33.698
11+698.40 33.739 -3.00% -3.00% 33.712 33.901 33.901 33.712
11+699.80 33.752 -3.00% -3.00% 33.725 33.914 33.914 33.725
11+701.20 33.765 -3.00% -3.00% 33.738 33.927 33.927 33.738
11+702.60 33.777 -3.00% -3.00% 33.750 33.939 33.939 33.750
11+704.00 33.788 -3.00% -3.00% 33.761 33.950 33.950 33.761
11+705.40 33.799 -3.00% -3.00% 33.772 33.961 33.961 33.772
11+706.80 33.809 -3.00% -3.00% 33.782 33.971 33.971 33.782
11+708.20 33.819 -3.00% -3.00% 33.792 33.981 33.981 33.792
11+709.60 33.828 -3.00% -3.00% 33.801 33.990 33.990 33.801
11+711.00 33.836 -3.00% -3.00% 33.809 33.998 33.998 33.809
11+712.40 33.844 -3.00% -3.00% 33.817 34.006 34.006 33.817
11+713.80 33.851 -3.00% -3.00% 33.824 34.013 34.013 33.824
11+715.20 33.857 -3.00% -3.00% 33.830 34.019 34.019 33.830
11+716.60 33.863 -3.00% -3.00% 33.836 34.025 34.025 33.836

279 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+718.00 33.868 -3.00% -3.00% 33.841 34.030 34.030 33.841


11+719.40 33.872 -3.00% -3.00% 33.845 34.034 34.034 33.845
11+720.80 33.876 -3.00% -3.00% 33.849 34.038 34.038 33.849
11+722.20 33.879 -3.00% -3.00% 33.852 34.041 34.041 33.852
11+723.60 33.882 -3.00% -3.00% 33.855 34.044 34.044 33.855
11+725.00 33.884 -3.00% -3.00% 33.857 34.046 34.046 33.857
11+726.40 33.885 -3.00% -3.00% 33.858 34.047 34.047 33.858
11+727.80 33.886 -3.00% -3.00% 33.859 34.048 34.048 33.859
11+729.20 33.886 -3.00% -3.00% 33.859 34.048 34.048 33.859
11+730.60 33.885 -3.00% -3.00% 33.858 34.047 34.047 33.858
11+732.00 33.884 -3.00% -3.00% 33.857 34.046 34.046 33.857
11+733.40 33.882 -3.00% -3.00% 33.855 34.044 34.044 33.855
11+734.80 33.880 -3.00% -3.00% 33.853 34.042 34.042 33.853
11+736.20 33.877 -3.00% -3.00% 33.850 34.039 34.039 33.850
11+737.60 33.873 -3.00% -3.00% 33.846 34.035 34.035 33.846
11+739.00 33.868 -3.00% -3.00% 33.841 34.030 34.030 33.841
11+740.40 33.863 -3.00% -3.00% 33.836 34.025 34.025 33.836
11+741.80 33.858 -3.00% -3.00% 33.831 34.020 34.020 33.831
11+743.20 33.851 -3.00% -3.00% 33.824 34.013 34.013 33.824
11+744.60 33.844 -3.00% -3.00% 33.817 34.006 34.006 33.817
11+746.00 33.837 -3.00% -3.00% 33.810 33.999 33.999 33.810
11+747.40 33.829 -3.00% -3.00% 33.802 33.991 33.991 33.802
11+748.80 33.820 -3.00% -3.00% 33.793 33.982 33.982 33.793
11+750.20 33.810 -3.00% -3.00% 33.783 33.972 33.972 33.783
11+751.60 33.800 -3.00% -3.00% 33.773 33.962 33.962 33.773
11+753.00 33.789 -3.00% -3.00% 33.762 33.951 33.951 33.762
11+754.40 33.778 -3.00% -3.00% 33.751 33.940 33.940 33.751
11+755.80 33.766 -3.00% -3.00% 33.739 33.928 33.928 33.739
11+757.20 33.753 -3.00% -3.00% 33.726 33.915 33.915 33.726
11+758.60 33.740 -3.00% -3.00% 33.713 33.902 33.902 33.713

280 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+760.00 33.726 -3.00% -3.00% 33.699 33.888 33.888 33.699


11+761.40 33.711 -3.00% -3.00% 33.684 33.873 33.873 33.684
11+762.80 33.696 -3.00% -3.00% 33.669 33.858 33.858 33.669
11+764.20 33.680 -3.00% -3.00% 33.653 33.842 33.842 33.653
11+765.60 33.664 -3.00% -3.00% 33.637 33.826 33.826 33.637
11+767.00 33.647 -3.00% -3.00% 33.620 33.809 33.809 33.620
11+768.40 33.629 -3.00% -3.00% 33.602 33.791 33.791 33.602
11+769.80 33.611 -3.00% -3.00% 33.584 33.773 33.773 33.584
11+771.20 33.592 -3.00% -3.00% 33.565 33.754 33.754 33.565
11+772.60 33.572 -3.00% -3.00% 33.545 33.734 33.734 33.545
11+774.00 33.553 -3.00% -3.00% 33.526 33.715 33.715 33.526
11+775.40 33.533 -3.00% -3.00% 33.506 33.695 33.695 33.506
11+776.80 33.514 -3.00% -3.00% 33.487 33.676 33.676 33.487
11+778.20 33.495 -3.00% -3.00% 33.468 33.657 33.657 33.468
11+779.60 33.475 -3.00% -3.00% 33.448 33.637 33.637 33.448
11+781.00 33.456 -3.00% -3.00% 33.429 33.618 33.618 33.429
11+782.40 33.437 -3.00% -3.00% 33.410 33.599 33.599 33.410
11+783.80 33.417 -3.00% -3.00% 33.390 33.579 33.579 33.390
11+785.20 33.398 -3.00% -3.00% 33.371 33.560 33.560 33.371
11+786.60 33.378 -3.00% -3.00% 33.351 33.540 33.540 33.351
11+788.00 33.359 -3.00% -3.00% 33.332 33.521 33.521 33.332
11+789.40 33.340 -3.00% -3.00% 33.313 33.502 33.502 33.313
11+790.80 33.320 -3.00% -3.00% 33.293 33.482 33.482 33.293
11+792.20 33.301 -3.00% -3.00% 33.274 33.463 33.463 33.274
11+793.60 33.283 -3.00% -3.00% 33.256 33.445 33.445 33.256
11+795.00 33.266 -3.00% -3.00% 33.239 33.428 33.428 33.239
11+796.40 33.249 -3.00% -3.00% 33.222 33.411 33.411 33.222
11+797.80 33.233 -3.00% -3.00% 33.206 33.395 33.395 33.206
11+799.20 33.218 -3.00% -3.00% 33.191 33.380 33.380 33.191
11+800.60 33.204 -3.00% -3.00% 33.177 33.366 33.366 33.177

281 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+802.00 33.190 -3.00% -3.00% 33.163 33.352 33.352 33.163


11+803.40 33.177 -3.00% -3.00% 33.150 33.339 33.339 33.150
11+804.80 33.164 -3.00% -3.00% 33.137 33.326 33.326 33.137
11+806.20 33.152 -3.00% -3.00% 33.125 33.314 33.314 33.125
11+807.60 33.141 -3.00% -3.00% 33.114 33.303 33.303 33.114
11+809.00 33.131 -3.00% -3.00% 33.104 33.293 33.293 33.104
11+810.40 33.122 -3.00% -3.00% 33.095 33.284 33.284 33.095
11+811.80 33.113 -3.00% -3.00% 33.086 33.275 33.275 33.086
11+813.20 33.105 -3.00% -3.00% 33.078 33.267 33.267 33.078
11+814.60 33.097 -3.00% -3.00% 33.070 33.259 33.259 33.070
11+816.00 33.090 -3.00% -3.00% 33.063 33.252 33.252 33.063
11+817.40 33.084 -3.00% -3.00% 33.057 33.246 33.246 33.057
11+818.80 33.079 -3.00% -3.00% 33.052 33.241 33.241 33.052
11+820.20 33.074 -3.00% -3.00% 33.047 33.236 33.236 33.047
11+821.60 33.070 -3.00% -3.00% 33.043 33.232 33.232 33.043
11+823.00 33.067 -3.00% -3.00% 33.040 33.229 33.229 33.040
11+824.40 33.064 -3.00% -3.00% 33.037 33.226 33.226 33.037
11+825.80 33.063 -3.00% -3.00% 33.036 33.225 33.225 33.036
11+827.20 33.062 -3.00% -3.00% 33.035 33.224 33.224 33.035
11+828.60 33.061 -3.00% -3.00% 33.034 33.223 33.223 33.034
11+830.00 33.061 -3.00% -3.00% 33.034 33.223 33.223 33.034
11+831.40 33.062 -3.00% -3.00% 33.035 33.224 33.224 33.035
11+832.80 33.064 -3.00% -3.00% 33.037 33.226 33.226 33.037
11+834.20 33.067 -3.00% -3.00% 33.040 33.229 33.229 33.040
11+835.60 33.070 -3.00% -3.00% 33.043 33.232 33.232 33.043
11+837.00 33.073 -3.00% -3.00% 33.046 33.235 33.235 33.046
11+838.40 33.078 -3.00% -3.00% 33.051 33.240 33.240 33.051
11+839.80 33.083 -3.00% -3.00% 33.056 33.245 33.245 33.056
11+841.20 33.089 -3.00% -3.00% 33.062 33.251 33.251 33.062
11+842.60 33.096 -3.00% -3.00% 33.069 33.258 33.258 33.069

282 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+844.00 33.103 -3.00% -3.00% 33.076 33.265 33.265 33.076


11+845.40 33.111 -3.00% -3.00% 33.084 33.273 33.273 33.084
11+846.80 33.120 -3.00% -3.00% 33.093 33.282 33.282 33.093
11+848.20 33.129 -3.00% -3.00% 33.102 33.291 33.291 33.102
11+849.60 33.140 -3.00% -3.00% 33.113 33.302 33.302 33.113
11+851.00 33.151 -3.00% -3.00% 33.124 33.313 33.313 33.124
11+852.40 33.162 -3.00% -3.00% 33.135 33.324 33.324 33.135
11+853.80 33.174 -3.00% -3.00% 33.147 33.336 33.336 33.147
11+855.20 33.187 -3.00% -3.00% 33.160 33.349 33.349 33.160
11+856.60 33.201 -3.00% -3.00% 33.174 33.363 33.363 33.174
11+858.00 33.216 -3.00% -3.00% 33.189 33.378 33.378 33.189
11+859.40 33.231 -3.00% -3.00% 33.204 33.393 33.393 33.204
11+860.80 33.247 -3.00% -3.00% 33.220 33.409 33.409 33.220
11+862.20 33.263 -3.00% -3.00% 33.236 33.425 33.425 33.236
11+863.60 33.280 -3.00% -3.00% 33.253 33.442 33.442 33.253
11+865.00 33.298 -3.00% -3.00% 33.271 33.460 33.460 33.271
11+866.40 33.317 -3.00% -3.00% 33.290 33.479 33.479 33.290
11+867.80 33.336 -3.00% -3.00% 33.309 33.498 33.498 33.309
11+869.20 33.356 -3.00% -3.00% 33.329 33.518 33.518 33.329
11+870.60 33.377 -3.00% -3.00% 33.350 33.539 33.539 33.350
11+872.00 33.399 -3.00% -3.00% 33.372 33.561 33.561 33.372
11+873.40 33.421 -3.00% -3.00% 33.394 33.583 33.583 33.394
11+874.80 33.444 -3.00% -3.00% 33.417 33.606 33.606 33.417
11+876.20 33.467 -3.00% -3.00% 33.440 33.629 33.629 33.440
11+877.60 33.492 -3.00% -3.00% 33.465 33.654 33.654 33.465
11+879.00 33.517 -3.00% -3.00% 33.490 33.679 33.679 33.490
11+880.40 33.542 -3.00% -3.00% 33.515 33.704 33.704 33.515
11+881.80 33.569 -3.00% -3.00% 33.542 33.731 33.731 33.542
11+883.20 33.596 -3.00% -3.00% 33.569 33.758 33.758 33.569
11+884.60 33.624 -3.00% -3.00% 33.597 33.786 33.786 33.597

283 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+886.00 33.652 -3.00% -3.00% 33.625 33.814 33.814 33.625


11+887.40 33.681 -3.00% -3.00% 33.654 33.843 33.843 33.654
11+888.80 33.711 -3.00% -3.00% 33.684 33.873 33.873 33.684
11+890.20 33.742 -3.00% -3.00% 33.715 33.904 33.904 33.715
11+891.60 33.773 -3.00% -3.00% 33.746 33.935 33.935 33.746
11+893.00 33.806 -3.00% -3.00% 33.779 33.968 33.968 33.779
11+894.40 33.838 -3.00% -3.00% 33.811 34.000 34.000 33.811
11+895.80 33.872 -3.00% -3.00% 33.845 34.034 34.034 33.845
11+897.20 33.906 -3.00% -3.00% 33.879 34.068 34.068 33.879
11+898.60 33.941 -3.00% -3.00% 33.914 34.103 34.103 33.914
11+900.00 33.976 -3.00% -3.00% 33.949 34.138 34.138 33.949
11+901.40 34.011 -3.00% -3.00% 33.984 34.173 34.173 33.984
11+902.80 34.046 -3.00% -3.00% 34.019 34.208 34.208 34.019
11+904.20 34.082 -3.00% -3.00% 34.055 34.244 34.244 34.055
11+905.60 34.116 -3.00% -3.00% 34.089 34.278 34.278 34.089
11+907.00 34.151 -3.00% -3.00% 34.124 34.313 34.313 34.124
11+908.40 34.185 -3.00% -3.00% 34.158 34.347 34.347 34.158
11+909.80 34.218 -3.00% -3.00% 34.191 34.380 34.380 34.191
11+911.20 34.251 -3.00% -3.00% 34.224 34.413 34.413 34.224
11+912.60 34.284 -3.00% -3.00% 34.257 34.446 34.446 34.257
11+914.00 34.316 -3.00% -3.00% 34.289 34.478 34.478 34.289
11+915.40 34.348 -3.00% -3.00% 34.321 34.510 34.510 34.321
11+916.80 34.379 -3.00% -3.00% 34.352 34.541 34.541 34.352
11+918.20 34.410 -3.00% -3.00% 34.383 34.572 34.572 34.383
11+919.60 34.440 -3.00% -3.00% 34.413 34.602 34.602 34.413
11+921.00 34.470 -3.00% -3.00% 34.443 34.632 34.632 34.443
11+922.40 34.500 -3.00% -3.00% 34.473 34.662 34.662 34.473
11+923.80 34.529 -3.00% -3.00% 34.502 34.691 34.691 34.502
11+925.20 34.558 -3.00% -3.00% 34.531 34.720 34.720 34.531
11+926.60 34.586 -3.00% -3.00% 34.559 34.748 34.748 34.559

284 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+928.00 34.614 -3.00% -3.00% 34.587 34.776 34.776 34.587


11+929.40 34.641 -3.00% -3.00% 34.614 34.803 34.803 34.614
11+930.80 34.668 -3.00% -3.00% 34.641 34.830 34.830 34.641
11+932.20 34.695 -3.00% -3.00% 34.668 34.857 34.857 34.668
11+933.60 34.721 -3.00% -3.00% 34.694 34.883 34.883 34.694
11+935.00 34.747 -3.00% -3.00% 34.720 34.909 34.909 34.720
11+936.40 34.772 -3.00% -3.00% 34.745 34.934 34.934 34.745
11+937.80 34.797 -3.00% -3.00% 34.770 34.959 34.959 34.770
11+939.20 34.821 -3.00% -3.00% 34.794 34.983 34.983 34.794
11+940.60 34.845 -3.00% -3.00% 34.818 35.007 35.007 34.818
11+942.00 34.869 -3.00% -3.00% 34.842 35.031 35.031 34.842
11+943.40 34.892 -3.00% -3.00% 34.865 35.054 35.054 34.865
11+944.80 34.915 -3.00% -3.00% 34.888 35.077 35.077 34.888
11+946.20 34.937 -3.00% -3.00% 34.910 35.099 35.099 34.910
11+947.60 34.959 -3.00% -3.00% 34.932 35.121 35.121 34.932
11+949.00 34.980 -3.00% -3.00% 34.953 35.142 35.142 34.953
11+950.40 35.001 -3.00% -3.00% 34.974 35.163 35.163 34.974
11+951.80 35.022 -3.00% -3.00% 34.995 35.184 35.184 34.995
11+953.20 35.042 -3.00% -3.00% 35.015 35.204 35.204 35.015
11+954.60 35.062 -3.00% -3.00% 35.035 35.224 35.224 35.035
11+956.00 35.081 -3.00% -3.00% 35.054 35.243 35.243 35.054
11+957.40 35.100 -3.00% -3.00% 35.073 35.262 35.262 35.073
11+958.80 35.118 -3.00% -3.00% 35.091 35.280 35.280 35.091
11+960.20 35.136 -3.00% -3.00% 35.109 35.298 35.298 35.109
11+961.60 35.153 -3.00% -3.00% 35.126 35.315 35.315 35.126
11+963.00 35.171 -3.00% -3.00% 35.144 35.333 35.333 35.144
11+964.40 35.187 -3.00% -3.00% 35.160 35.349 35.349 35.160
11+965.80 35.203 -3.00% -3.00% 35.176 35.365 35.365 35.176
11+967.20 35.219 -3.00% -3.00% 35.192 35.381 35.381 35.192
11+968.60 35.235 -3.00% -3.00% 35.208 35.397 35.397 35.208

285 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

11+970.00 35.250 -3.00% -3.00% 35.223 35.412 35.412 35.223


11+971.40 35.264 -3.00% -3.00% 35.237 35.426 35.426 35.237
11+972.80 35.278 -3.00% -3.00% 35.251 35.440 35.440 35.251
11+974.20 35.292 -3.00% -3.00% 35.265 35.454 35.454 35.265
11+975.60 35.305 -3.00% -3.00% 35.278 35.467 35.467 35.278
11+977.00 35.318 -3.00% -3.00% 35.291 35.480 35.480 35.291
11+978.40 35.330 -3.00% -3.00% 35.303 35.492 35.492 35.303
11+979.80 35.342 -3.00% -3.00% 35.315 35.504 35.504 35.315
11+981.20 35.353 -3.00% -3.00% 35.326 35.515 35.515 35.326
11+982.60 35.364 -3.00% -3.00% 35.337 35.526 35.526 35.337
11+984.00 35.375 -3.00% -3.00% 35.348 35.537 35.537 35.348
11+985.40 35.385 -3.00% -3.00% 35.358 35.547 35.547 35.358
11+986.80 35.395 -3.00% -3.00% 35.368 35.557 35.557 35.368
11+988.20 35.404 -3.00% -3.00% 35.377 35.566 35.566 35.377
11+989.60 35.413 -3.00% -3.00% 35.386 35.575 35.575 35.386
11+991.00 35.422 -3.00% -3.00% 35.395 35.584 35.584 35.395
11+992.40 35.430 -3.00% -3.00% 35.403 35.592 35.592 35.403
11+993.80 35.437 -3.00% -3.00% 35.410 35.599 35.599 35.410
11+995.20 35.445 -3.00% -3.00% 35.418 35.607 35.607 35.418
11+996.60 35.451 -3.00% -3.00% 35.424 35.613 35.613 35.424
11+998.00 35.458 -3.00% -3.00% 35.431 35.620 35.620 35.431
11+999.40 35.463 -3.00% -3.00% 35.436 35.625 35.625 35.436
12+000.80 35.469 -3.00% -3.00% 35.442 35.631 35.631 35.442
12+002.20 35.474 -3.00% -3.00% 35.447 35.636 35.636 35.447
12+003.60 35.478 -3.00% -3.00% 35.451 35.640 35.640 35.451
12+005.00 35.483 -3.00% -3.00% 35.456 35.645 35.645 35.456
12+006.40 35.486 -3.00% -3.00% 35.459 35.648 35.648 35.459
12+007.80 35.490 -3.00% -3.00% 35.463 35.652 35.652 35.463
12+009.20 35.492 -3.00% -3.00% 35.465 35.654 35.654 35.465
12+010.60 35.495 -3.00% -3.00% 35.468 35.657 35.657 35.468

286 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+012.00 35.497 -3.00% -3.00% 35.470 35.659 35.659 35.470


12+013.40 35.498 -3.00% -3.00% 35.471 35.660 35.660 35.471
12+014.80 35.500 -3.00% -3.00% 35.473 35.662 35.662 35.473
12+016.20 35.500 -3.00% -3.00% 35.473 35.662 35.662 35.473
12+017.60 35.500 -3.00% -3.00% 35.473 35.662 35.662 35.473
12+019.00 35.500 -3.00% -3.00% 35.473 35.662 35.662 35.473
12+020.40 35.500 -3.00% -3.00% 35.473 35.662 35.662 35.473
12+021.80 35.499 -3.00% -3.00% 35.472 35.661 35.661 35.472
12+023.20 35.497 -3.00% -3.00% 35.470 35.659 35.659 35.470
12+024.60 35.495 -3.00% -3.00% 35.468 35.657 35.657 35.468
12+026.00 35.493 -3.00% -3.00% 35.466 35.655 35.655 35.466
12+027.40 35.490 -3.00% -3.00% 35.463 35.652 35.652 35.463
12+028.80 35.487 -3.00% -3.00% 35.460 35.649 35.649 35.460
12+030.20 35.483 -3.00% -3.00% 35.456 35.645 35.645 35.456
12+031.60 35.479 -3.00% -3.00% 35.452 35.641 35.641 35.452
12+033.00 35.475 -3.00% -3.00% 35.448 35.637 35.637 35.448
12+034.40 35.470 -3.00% -3.00% 35.443 35.632 35.632 35.443
12+035.80 35.465 -3.00% -3.00% 35.438 35.627 35.627 35.438
12+037.20 35.459 -3.00% -3.00% 35.432 35.621 35.621 35.432
12+038.60 35.453 -3.00% -3.00% 35.426 35.615 35.615 35.426
12+040.00 35.446 -3.00% -3.00% 35.419 35.608 35.608 35.419
12+041.40 35.439 -3.00% -3.00% 35.412 35.601 35.601 35.412
12+042.80 35.432 -3.00% -3.00% 35.405 35.594 35.594 35.405
12+044.20 35.424 -3.00% -3.00% 35.397 35.586 35.586 35.397
12+045.60 35.415 -3.00% -3.00% 35.388 35.577 35.577 35.388
12+047.00 35.406 -3.00% -3.00% 35.379 35.568 35.568 35.379
12+048.40 35.397 -3.00% -3.00% 35.370 35.559 35.559 35.370
12+049.80 35.388 -3.00% -3.00% 35.361 35.550 35.550 35.361
12+051.20 35.377 -3.00% -3.00% 35.350 35.539 35.539 35.350
12+052.60 35.367 -3.00% -3.00% 35.340 35.529 35.529 35.340

287 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+054.00 35.356 -3.00% -3.00% 35.329 35.518 35.518 35.329


12+055.40 35.345 -3.00% -3.00% 35.318 35.507 35.507 35.318
12+056.80 35.333 -3.00% -3.00% 35.306 35.495 35.495 35.306
12+058.20 35.321 -3.00% -3.00% 35.294 35.483 35.483 35.294
12+059.60 35.308 -3.00% -3.00% 35.281 35.470 35.470 35.281
12+061.00 35.295 -3.00% -3.00% 35.268 35.457 35.457 35.268
12+062.40 35.281 -3.00% -3.00% 35.254 35.443 35.443 35.254
12+063.80 35.267 -3.00% -3.00% 35.240 35.429 35.429 35.240
12+065.20 35.253 -3.00% -3.00% 35.226 35.415 35.415 35.226
12+066.60 35.238 -3.00% -3.00% 35.211 35.400 35.400 35.211
12+068.00 35.223 -3.00% -3.00% 35.196 35.385 35.385 35.196
12+069.40 35.207 -3.00% -3.00% 35.180 35.369 35.369 35.180
12+070.80 35.191 -3.00% -3.00% 35.164 35.353 35.353 35.164
12+072.20 35.174 -3.00% -3.00% 35.147 35.336 35.336 35.147
12+073.60 35.157 -3.00% -3.00% 35.130 35.319 35.319 35.130
12+075.00 35.140 -3.00% -3.00% 35.113 35.302 35.302 35.113
12+076.40 35.122 -3.00% -3.00% 35.095 35.284 35.284 35.095
12+077.80 35.104 -3.00% -3.00% 35.077 35.266 35.266 35.077
12+079.20 35.085 -3.00% -3.00% 35.058 35.247 35.247 35.058
12+080.60 35.066 -3.00% -3.00% 35.039 35.228 35.228 35.039
12+082.00 35.046 -3.00% -3.00% 35.019 35.208 35.208 35.019
12+083.40 35.026 -3.00% -3.00% 34.999 35.188 35.188 34.999
12+084.80 35.006 -3.00% -3.00% 34.979 35.168 35.168 34.979
12+086.20 34.985 -3.00% -3.00% 34.958 35.147 35.147 34.958
12+087.60 34.964 -3.00% -3.00% 34.937 35.126 35.126 34.937
12+089.00 34.942 -3.00% -3.00% 34.915 35.104 35.104 34.915
12+090.40 34.920 -3.00% -3.00% 34.893 35.082 35.082 34.893
12+091.80 34.897 -3.00% -3.00% 34.870 35.059 35.059 34.870
12+093.20 34.874 -3.00% -3.00% 34.847 35.036 35.036 34.847
12+094.60 34.851 -3.00% -3.00% 34.824 35.013 35.013 34.824

288 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+096.00 34.827 -3.00% -3.00% 34.800 34.989 34.989 34.800


12+097.40 34.803 -3.00% -3.00% 34.776 34.965 34.965 34.776
12+098.80 34.778 -3.00% -3.00% 34.751 34.940 34.940 34.751
12+100.20 34.753 -3.00% -3.00% 34.726 34.915 34.915 34.726
12+101.60 34.727 -3.00% -3.00% 34.700 34.889 34.889 34.700
12+103.00 34.701 -3.00% -3.00% 34.674 34.863 34.863 34.674
12+104.40 34.675 -3.00% -3.00% 34.648 34.837 34.837 34.648
12+105.80 34.648 -3.00% -3.00% 34.621 34.810 34.810 34.621
12+107.20 34.620 -3.00% -3.00% 34.593 34.782 34.782 34.593
12+108.60 34.593 -3.00% -3.00% 34.566 34.755 34.755 34.566
12+110.00 34.564 -3.00% -3.00% 34.537 34.726 34.726 34.537
12+111.40 34.536 -3.00% -3.00% 34.509 34.698 34.698 34.509
12+112.80 34.507 -3.00% -3.00% 34.480 34.669 34.669 34.480
12+114.20 34.477 -3.00% -3.00% 34.450 34.639 34.639 34.450
12+115.60 34.447 -3.00% -3.00% 34.420 34.609 34.609 34.420
12+117.00 34.417 -3.00% -3.00% 34.390 34.579 34.579 34.390
12+118.40 34.386 -3.00% -3.00% 34.359 34.548 34.548 34.359
12+119.80 34.355 -3.00% -3.00% 34.328 34.517 34.517 34.328
12+121.20 34.323 -3.00% -3.00% 34.296 34.485 34.485 34.296
12+122.60 34.291 -3.00% -3.00% 34.264 34.453 34.453 34.264
12+124.00 34.259 -3.00% -3.00% 34.232 34.421 34.421 34.232
12+125.40 34.226 -3.00% -3.00% 34.199 34.388 34.388 34.199
12+126.80 34.192 -3.00% -3.00% 34.165 34.354 34.354 34.165
12+128.20 34.158 -3.00% -3.00% 34.131 34.320 34.320 34.131
12+129.60 34.124 -3.00% -3.00% 34.097 34.286 34.286 34.097
12+131.00 34.090 -3.00% -3.00% 34.063 34.252 34.252 34.063
12+132.40 34.054 -3.00% -3.00% 34.027 34.216 34.216 34.027
12+133.80 34.019 -3.00% -3.00% 33.992 34.181 34.181 33.992
12+135.20 33.984 -3.00% -3.00% 33.957 34.146 34.146 33.957
12+136.60 33.949 -3.00% -3.00% 33.922 34.111 34.111 33.922

289 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+138.00 33.914 -3.00% -3.00% 33.887 34.076 34.076 33.887


12+139.40 33.880 -3.00% -3.00% 33.853 34.042 34.042 33.853
12+140.80 33.846 -3.00% -3.00% 33.819 34.008 34.008 33.819
12+142.20 33.812 -3.00% -3.00% 33.785 33.974 33.974 33.785
12+143.60 33.779 -3.00% -3.00% 33.752 33.941 33.941 33.752
12+145.00 33.745 -3.00% -3.00% 33.718 33.907 33.907 33.718
12+146.40 33.713 -3.00% -3.00% 33.686 33.875 33.875 33.686
12+147.80 33.680 -3.00% -3.00% 33.653 33.842 33.842 33.653
12+149.20 33.648 -3.00% -3.00% 33.621 33.810 33.810 33.621
12+150.60 33.616 -3.00% -3.00% 33.589 33.778 33.778 33.589
12+152.00 33.584 -3.00% -3.00% 33.557 33.746 33.746 33.557
12+153.40 33.553 -3.00% -3.00% 33.526 33.715 33.715 33.526
12+154.80 33.522 -3.00% -3.00% 33.495 33.684 33.684 33.495
12+156.20 33.491 -3.00% -3.00% 33.464 33.653 33.653 33.464
12+157.60 33.461 -3.00% -3.00% 33.434 33.623 33.623 33.434
12+159.00 33.431 -3.00% -3.00% 33.404 33.593 33.593 33.404
12+160.40 33.401 -3.00% -3.00% 33.374 33.563 33.563 33.374
12+161.80 33.371 -3.00% -3.00% 33.344 33.533 33.533 33.344
12+163.20 33.342 -3.00% -3.00% 33.315 33.504 33.504 33.315
12+164.60 33.313 -3.00% -3.00% 33.286 33.475 33.475 33.286
12+166.00 33.285 -3.00% -3.00% 33.258 33.447 33.447 33.258
12+167.40 33.256 -3.00% -3.00% 33.229 33.418 33.418 33.229
12+168.80 33.228 -3.00% -3.00% 33.201 33.390 33.390 33.201
12+170.20 33.201 -3.00% -3.00% 33.174 33.363 33.363 33.174
12+171.60 33.173 -3.00% -3.00% 33.146 33.335 33.335 33.146
12+173.00 33.146 -3.00% -3.00% 33.119 33.308 33.308 33.119
12+174.40 33.120 -3.00% -3.00% 33.093 33.282 33.282 33.093
12+175.80 33.093 -3.00% -3.00% 33.066 33.255 33.255 33.066
12+177.20 33.067 -3.00% -3.00% 33.040 33.229 33.229 33.040
12+178.60 33.041 -3.00% -3.00% 33.014 33.203 33.203 33.014

290 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+180.00 33.016 -3.00% -3.00% 32.989 33.178 33.178 32.989


12+181.40 32.991 -3.00% -3.00% 32.964 33.153 33.153 32.964
12+182.80 32.966 -3.00% -3.00% 32.939 33.128 33.128 32.939
12+184.20 32.941 -3.00% -3.00% 32.914 33.103 33.103 32.914
12+185.60 32.917 -3.00% -3.00% 32.890 33.079 33.079 32.890
12+187.00 32.893 -3.00% -3.00% 32.866 33.055 33.055 32.866
12+188.40 32.869 -3.00% -3.00% 32.842 33.031 33.031 32.842
12+189.80 32.846 -3.00% -3.00% 32.819 33.008 33.008 32.819
12+191.20 32.823 -3.00% -3.00% 32.796 32.985 32.985 32.796
12+192.60 32.800 -3.00% -3.00% 32.773 32.962 32.962 32.773
12+194.00 32.778 -3.00% -3.00% 32.751 32.940 32.940 32.751
12+195.40 32.756 -3.00% -3.00% 32.729 32.918 32.918 32.729
12+196.80 32.734 -3.00% -3.00% 32.707 32.896 32.896 32.707
12+198.20 32.713 -3.00% -3.00% 32.686 32.875 32.875 32.686
12+199.60 32.691 -3.00% -3.00% 32.664 32.853 32.853 32.664
12+201.00 32.671 -3.00% -3.00% 32.644 32.833 32.833 32.644
12+202.40 32.650 -3.00% -3.00% 32.623 32.812 32.812 32.623
12+203.80 32.630 -3.00% -3.00% 32.603 32.792 32.792 32.603
12+205.20 32.610 -3.00% -3.00% 32.583 32.772 32.772 32.583
12+206.60 32.590 -3.00% -3.00% 32.563 32.752 32.752 32.563
12+208.00 32.571 -3.00% -3.00% 32.544 32.733 32.733 32.544
12+209.40 32.552 -3.00% -3.00% 32.525 32.714 32.714 32.525
12+210.80 32.533 -3.00% -3.00% 32.506 32.695 32.695 32.506
12+212.20 32.515 -3.00% -3.00% 32.488 32.677 32.677 32.488
12+213.60 32.497 -3.00% -3.00% 32.470 32.659 32.659 32.470
12+215.00 32.479 -3.00% -3.00% 32.452 32.641 32.641 32.452
12+216.40 32.461 -3.00% -3.00% 32.434 32.623 32.623 32.434
12+217.80 32.444 -3.00% -3.00% 32.417 32.606 32.606 32.417
12+219.20 32.427 -3.00% -3.00% 32.400 32.589 32.589 32.400
12+220.60 32.411 -3.00% -3.00% 32.384 32.573 32.573 32.384

291 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+222.00 32.395 -3.00% -3.00% 32.368 32.557 32.557 32.368


12+223.40 32.379 -3.00% -3.00% 32.352 32.541 32.541 32.352
12+224.80 32.363 -3.00% -3.00% 32.336 32.525 32.525 32.336
12+226.20 32.348 -3.00% -3.00% 32.321 32.510 32.510 32.321
12+227.60 32.333 -3.00% -3.00% 32.306 32.495 32.495 32.306
12+229.00 32.318 -3.00% -3.00% 32.291 32.480 32.480 32.291
12+230.40 32.304 -3.00% -3.00% 32.277 32.466 32.466 32.277
12+231.80 32.289 -3.00% -3.00% 32.262 32.451 32.451 32.262
12+233.20 32.276 -3.00% -3.00% 32.249 32.438 32.438 32.249
12+234.60 32.262 -3.00% -3.00% 32.235 32.424 32.424 32.235
12+236.00 32.249 -3.00% -3.00% 32.222 32.411 32.411 32.222
12+237.40 32.236 -3.00% -3.00% 32.209 32.398 32.398 32.209
12+238.80 32.224 -3.00% -3.00% 32.197 32.386 32.386 32.197
12+240.20 32.211 -3.00% -3.00% 32.184 32.373 32.373 32.184
12+241.60 32.199 -3.00% -3.00% 32.172 32.361 32.361 32.172
12+243.00 32.188 -3.00% -3.00% 32.161 32.350 32.350 32.161
12+244.40 32.176 -3.00% -3.00% 32.149 32.338 32.338 32.149
12+245.80 32.164 -3.00% -3.00% 32.137 32.326 32.326 32.137
12+247.20 32.153 -3.00% -3.00% 32.126 32.315 32.315 32.126
12+248.60 32.141 -3.00% -3.00% 32.114 32.303 32.303 32.114
12+250.00 32.129 -3.00% -3.00% 32.102 32.291 32.291 32.102
12+251.40 32.117 -3.00% -3.00% 32.090 32.279 32.279 32.090
12+252.80 32.106 -3.00% -3.00% 32.079 32.268 32.268 32.079
12+254.20 32.094 -3.00% -3.00% 32.067 32.256 32.256 32.067
12+255.60 32.082 -3.00% -3.00% 32.055 32.244 32.244 32.055
12+257.00 32.070 -3.00% -3.00% 32.043 32.232 32.232 32.043
12+258.40 32.059 -3.00% -3.00% 32.032 32.221 32.221 32.032
12+259.80 32.047 -3.00% -3.00% 32.020 32.209 32.209 32.020
12+261.20 32.035 -3.00% -3.00% 32.008 32.197 32.197 32.008
12+262.60 32.023 -3.00% -3.00% 31.996 32.185 32.185 31.996

292 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+264.00 32.012 -3.00% -3.00% 31.985 32.174 32.174 31.985


12+265.40 32.000 -3.00% -3.00% 31.973 32.162 32.162 31.973
12+266.80 31.988 -3.00% -3.00% 31.961 32.150 32.150 31.961
12+268.20 31.976 -3.00% -3.00% 31.949 32.138 32.138 31.949
12+269.60 31.965 -3.00% -3.00% 31.938 32.127 32.127 31.938
12+271.00 31.953 -3.00% -3.00% 31.926 32.115 32.115 31.926
12+272.40 31.941 -3.00% -3.00% 31.914 32.103 32.103 31.914
12+273.80 31.929 -3.00% -3.00% 31.902 32.091 32.091 31.902
12+275.20 31.918 -3.00% -3.00% 31.891 32.080 32.080 31.891
12+276.60 31.906 -3.00% -3.00% 31.879 32.068 32.068 31.879
12+278.00 31.894 -3.00% -3.00% 31.867 32.056 32.056 31.867
12+279.40 31.883 -3.00% -3.00% 31.856 32.045 32.045 31.856
12+280.80 31.871 -3.00% -3.00% 31.844 32.033 32.033 31.844
12+282.20 31.859 -3.00% -3.00% 31.832 32.021 32.021 31.832
12+283.60 31.847 -3.00% -3.00% 31.820 32.009 32.009 31.820
12+285.00 31.836 -3.00% -3.00% 31.809 31.998 31.998 31.809
12+286.40 31.824 -3.00% -3.00% 31.797 31.986 31.986 31.797
12+287.80 31.812 -3.00% -3.00% 31.785 31.974 31.974 31.785
12+289.20 31.800 -3.00% -3.00% 31.773 31.962 31.962 31.773
12+290.60 31.789 -3.00% -3.00% 31.762 31.951 31.951 31.762
12+292.00 31.777 -3.00% -3.00% 31.750 31.939 31.939 31.750
12+293.40 31.765 -3.00% -3.00% 31.738 31.927 31.927 31.738
12+294.80 31.753 -3.00% -3.00% 31.726 31.915 31.915 31.726
12+296.20 31.742 -3.00% -3.00% 31.715 31.904 31.904 31.715
12+297.60 31.730 -3.00% -3.00% 31.703 31.892 31.892 31.703
12+299.00 31.718 -3.00% -3.00% 31.691 31.880 31.880 31.691
12+300.40 31.706 -3.00% -3.00% 31.679 31.868 31.868 31.679
12+301.80 31.695 -3.00% -3.00% 31.668 31.857 31.857 31.668
12+303.20 31.683 -3.00% -3.00% 31.656 31.845 31.845 31.656
12+304.60 31.671 -3.00% -3.00% 31.644 31.833 31.833 31.644

293 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+306.00 31.660 -3.00% -3.00% 31.633 31.822 31.822 31.633


12+307.40 31.648 -3.00% -3.00% 31.621 31.810 31.810 31.621
12+308.80 31.636 -3.00% -3.00% 31.609 31.798 31.798 31.609
12+310.20 31.624 -3.00% -3.00% 31.597 31.786 31.786 31.597
12+311.60 31.613 -3.00% -3.00% 31.586 31.775 31.775 31.586
12+313.00 31.601 -3.00% -3.00% 31.574 31.763 31.763 31.574
12+314.40 31.589 -3.00% -3.00% 31.562 31.751 31.751 31.562
12+315.80 31.577 -3.00% -3.00% 31.550 31.739 31.739 31.550
12+317.20 31.566 -3.00% -3.00% 31.539 31.728 31.728 31.539
12+318.60 31.554 -3.00% -3.00% 31.527 31.716 31.716 31.527
12+320.00 31.542 -3.00% -3.00% 31.515 31.704 31.704 31.515
12+321.40 31.530 -3.00% -3.00% 31.503 31.692 31.692 31.503
12+322.80 31.519 -3.00% -3.00% 31.492 31.681 31.681 31.492
12+324.20 31.507 -3.00% -3.00% 31.480 31.669 31.669 31.480
12+325.60 31.495 -3.00% -3.00% 31.468 31.657 31.657 31.468
12+327.00 31.483 -3.00% -3.00% 31.456 31.645 31.645 31.456
12+328.40 31.472 -3.00% -3.00% 31.445 31.634 31.634 31.445
12+329.80 31.460 -3.00% -3.00% 31.433 31.622 31.622 31.433
12+331.20 31.448 -3.00% -3.00% 31.421 31.610 31.610 31.421
12+332.60 31.436 -3.00% -3.00% 31.409 31.598 31.598 31.409
12+334.00 31.425 -3.00% -3.00% 31.398 31.587 31.587 31.398
12+335.40 31.413 -3.00% -3.00% 31.386 31.575 31.575 31.386
12+336.80 31.401 -3.00% -3.00% 31.374 31.563 31.563 31.374
12+338.20 31.390 -3.00% -3.00% 31.363 31.552 31.552 31.363
12+339.60 31.378 -3.00% -3.00% 31.351 31.540 31.540 31.351
12+341.00 31.366 -3.00% -3.00% 31.339 31.528 31.528 31.339
12+342.40 31.354 -3.00% -3.00% 31.327 31.516 31.516 31.327
12+343.80 31.343 -3.00% -3.00% 31.316 31.505 31.505 31.316
12+345.20 31.331 -3.00% -3.00% 31.304 31.493 31.493 31.304
12+346.60 31.319 -3.00% -3.00% 31.292 31.481 31.481 31.292

294 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+348.00 31.307 -3.00% -3.00% 31.280 31.469 31.469 31.280


12+349.40 31.296 -3.00% -3.00% 31.269 31.458 31.458 31.269
12+350.80 31.284 -3.00% -3.00% 31.257 31.446 31.446 31.257
12+352.20 31.272 -3.00% -3.00% 31.245 31.434 31.434 31.245
12+353.60 31.260 -3.00% -3.00% 31.233 31.422 31.422 31.233
12+355.00 31.249 -3.00% -3.00% 31.222 31.411 31.411 31.222
12+356.40 31.237 -3.00% -3.00% 31.210 31.399 31.399 31.210
12+357.80 31.225 -3.00% -3.00% 31.198 31.387 31.387 31.198
12+359.20 31.213 -3.00% -3.00% 31.186 31.375 31.375 31.186
12+360.60 31.202 -3.00% -3.00% 31.175 31.364 31.364 31.175
12+362.00 31.190 -3.00% -3.00% 31.163 31.352 31.352 31.163
12+363.40 31.178 -3.00% -3.00% 31.151 31.340 31.340 31.151
12+364.80 31.166 -3.00% -3.00% 31.139 31.328 31.328 31.139
12+366.20 31.155 -3.00% -3.00% 31.128 31.317 31.317 31.128
12+367.60 31.143 -3.00% -3.00% 31.116 31.305 31.305 31.116
12+369.00 31.131 -3.00% -3.00% 31.104 31.293 31.293 31.104
12+370.40 31.120 -3.00% -3.00% 31.093 31.282 31.282 31.093
12+371.80 31.108 -3.00% -3.00% 31.081 31.270 31.270 31.081
12+373.20 31.095 -3.00% -3.00% 31.068 31.257 31.257 31.068
12+374.60 31.083 -3.00% -3.00% 31.056 31.245 31.245 31.056
12+376.00 31.070 -3.00% -3.00% 31.043 31.232 31.232 31.043
12+377.40 31.058 -3.00% -3.00% 31.031 31.220 31.220 31.031
12+378.80 31.045 -3.00% -3.00% 31.018 31.207 31.207 31.018
12+380.20 31.031 -3.00% -3.00% 31.004 31.193 31.193 31.004
12+381.60 31.018 -3.00% -3.00% 30.991 31.180 31.180 30.991
12+383.00 31.004 -3.00% -3.00% 30.977 31.166 31.166 30.977
12+384.40 30.990 -3.00% -3.00% 30.963 31.152 31.152 30.963
12+385.80 30.976 -3.00% -3.00% 30.949 31.138 31.138 30.949
12+387.20 30.961 -3.00% -3.00% 30.934 31.123 31.123 30.934
12+388.60 30.947 -3.00% -3.00% 30.920 31.109 31.109 30.920

295 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+390.00 30.932 -3.00% -3.00% 30.905 31.094 31.094 30.905


12+391.40 30.916 -3.00% -3.00% 30.889 31.078 31.078 30.889
12+392.80 30.901 -3.00% -3.00% 30.874 31.063 31.063 30.874
12+394.20 30.885 -3.00% -3.00% 30.858 31.047 31.047 30.858
12+395.60 30.870 -3.00% -3.00% 30.843 31.032 31.032 30.843
12+397.00 30.854 -3.00% -3.00% 30.827 31.016 31.016 30.827
12+398.40 30.837 -3.00% -3.00% 30.810 30.999 30.999 30.810
12+399.80 30.821 -3.00% -3.00% 30.794 30.983 30.983 30.794
12+401.20 30.804 -3.00% -3.00% 30.777 30.966 30.966 30.777
12+402.60 30.787 -3.00% -3.00% 30.760 30.949 30.949 30.760
12+404.00 30.770 -3.00% -3.00% 30.743 30.932 30.932 30.743
12+405.40 30.752 -3.00% -3.00% 30.725 30.914 30.914 30.725
12+406.80 30.735 -3.00% -3.00% 30.708 30.897 30.897 30.708
12+408.20 30.717 -3.00% -3.00% 30.690 30.879 30.879 30.690
12+409.60 30.698 -3.00% -3.00% 30.671 30.860 30.860 30.671
12+411.00 30.680 -3.00% -3.00% 30.653 30.842 30.842 30.653
12+412.40 30.661 -3.00% -3.00% 30.634 30.823 30.823 30.634
12+413.80 30.643 -3.00% -3.00% 30.616 30.805 30.805 30.616
12+415.20 30.623 -3.00% -3.00% 30.596 30.785 30.785 30.596
12+416.60 30.604 -3.00% -3.00% 30.577 30.766 30.766 30.577
12+418.00 30.585 -3.00% -3.00% 30.558 30.747 30.747 30.558
12+419.40 30.565 -3.00% -3.00% 30.538 30.727 30.727 30.538
12+420.80 30.545 -3.00% -3.00% 30.518 30.707 30.707 30.518
12+422.20 30.525 -3.00% -3.00% 30.498 30.687 30.687 30.498
12+423.60 30.504 -3.00% -3.00% 30.477 30.666 30.666 30.477
12+425.00 30.483 -3.00% -3.00% 30.456 30.645 30.645 30.456
12+426.40 30.463 -3.00% -3.00% 30.436 30.625 30.625 30.436
12+427.80 30.441 -3.00% -3.00% 30.414 30.603 30.603 30.414
12+429.20 30.420 -3.00% -3.00% 30.393 30.582 30.582 30.393
12+430.60 30.398 -3.00% -3.00% 30.371 30.560 30.560 30.371

296 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+432.00 30.377 -3.00% -3.00% 30.350 30.539 30.539 30.350


12+433.40 30.354 -3.00% -3.00% 30.327 30.516 30.516 30.327
12+434.80 30.332 -3.00% -3.00% 30.305 30.494 30.494 30.305
12+436.20 30.310 -3.00% -3.00% 30.283 30.472 30.472 30.283
12+437.60 30.287 -3.00% -3.00% 30.260 30.449 30.449 30.260
12+439.00 30.264 -3.00% -3.00% 30.237 30.426 30.426 30.237
12+440.40 30.241 -3.00% -3.00% 30.214 30.403 30.403 30.214
12+441.80 30.217 -3.00% -3.00% 30.190 30.379 30.379 30.190
12+443.20 30.193 -3.00% -3.00% 30.166 30.355 30.355 30.166
12+444.60 30.169 -3.00% -3.00% 30.142 30.331 30.331 30.142
12+446.00 30.145 -3.00% -3.00% 30.118 30.307 30.307 30.118
12+447.40 30.121 -3.00% -3.00% 30.094 30.283 30.283 30.094
12+448.80 30.096 -3.00% -3.00% 30.069 30.258 30.258 30.069
12+450.20 30.071 -3.00% -3.00% 30.044 30.233 30.233 30.044
12+451.60 30.046 -3.00% -3.00% 30.019 30.208 30.208 30.019
12+453.00 30.021 -3.00% -3.00% 29.994 30.183 30.183 29.994
12+454.40 29.995 -3.00% -3.00% 29.968 30.157 30.157 29.968
12+455.80 29.970 -3.00% -3.00% 29.943 30.132 30.132 29.943
12+457.20 29.944 -3.00% -3.00% 29.917 30.106 30.106 29.917
12+458.60 29.918 -3.00% -3.00% 29.891 30.080 30.080 29.891
12+460.00 29.891 -3.00% -3.00% 29.864 30.053 30.053 29.864
12+461.40 29.865 -3.00% -3.00% 29.838 30.027 30.027 29.838
12+462.80 29.839 -3.00% -3.00% 29.812 30.001 30.001 29.812
12+464.20 29.813 -3.00% -3.00% 29.786 29.975 29.975 29.786
12+465.60 29.787 -3.00% -3.00% 29.760 29.949 29.949 29.760
12+467.00 29.761 -3.00% -3.00% 29.734 29.923 29.923 29.734
12+468.40 29.734 -3.00% -3.00% 29.707 29.896 29.896 29.707
12+469.80 29.708 -3.00% -3.00% 29.681 29.870 29.870 29.681
12+471.20 29.682 -3.00% -3.00% 29.655 29.844 29.844 29.655
12+472.60 29.656 -3.00% -3.00% 29.629 29.818 29.818 29.629

297 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+474.00 29.630 -3.00% -3.00% 29.603 29.792 29.792 29.603


12+475.40 29.604 -3.00% -3.00% 29.577 29.766 29.766 29.577
12+476.80 29.577 -3.00% -3.00% 29.550 29.739 29.739 29.550
12+478.20 29.551 -3.00% -3.00% 29.524 29.713 29.713 29.524
12+479.60 29.525 -3.00% -3.00% 29.498 29.687 29.687 29.498
12+481.00 29.499 -3.00% -3.00% 29.472 29.661 29.661 29.472
12+482.40 29.473 -3.00% -3.00% 29.446 29.635 29.635 29.446
12+483.80 29.447 -3.00% -3.00% 29.420 29.609 29.609 29.420
12+485.20 29.420 -3.00% -3.00% 29.393 29.582 29.582 29.393
12+486.60 29.394 -3.00% -3.00% 29.367 29.556 29.556 29.367
12+488.00 29.368 -3.00% -3.00% 29.341 29.530 29.530 29.341
12+489.40 29.342 -3.00% -3.00% 29.315 29.504 29.504 29.315
12+490.80 29.316 -3.00% -3.00% 29.289 29.478 29.478 29.289
12+492.20 29.290 -3.00% -3.00% 29.263 29.452 29.452 29.263
12+493.60 29.263 -3.00% -3.00% 29.236 29.425 29.425 29.236
12+495.00 29.237 -3.00% -3.00% 29.210 29.399 29.399 29.210
12+496.40 29.211 -3.00% -3.00% 29.184 29.373 29.373 29.184
12+497.80 29.185 -3.00% -3.00% 29.158 29.347 29.347 29.158
12+499.20 29.159 -3.00% -3.00% 29.132 29.321 29.321 29.132
12+500.60 29.133 -3.00% -3.00% 29.106 29.295 29.295 29.106
12+502.00 29.106 -3.00% -3.00% 29.079 29.268 29.268 29.079
12+503.40 29.080 -3.00% -3.00% 29.053 29.242 29.242 29.053
12+504.80 29.054 -3.00% -3.00% 29.027 29.216 29.216 29.027
12+506.20 29.028 -3.00% -3.00% 29.001 29.190 29.190 29.001
12+507.60 29.002 -3.00% -3.00% 28.975 29.164 29.164 28.975
12+509.00 28.976 -3.00% -3.00% 28.949 29.138 29.138 28.949
12+510.40 28.949 -3.00% -3.00% 28.922 29.111 29.111 28.922
12+511.80 28.923 -3.00% -3.00% 28.896 29.085 29.085 28.896
12+513.20 28.897 -3.00% -3.00% 28.870 29.059 29.059 28.870
12+514.60 28.871 -3.00% -3.00% 28.844 29.033 29.033 28.844

298 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+516.00 28.845 -3.00% -3.00% 28.818 29.007 29.007 28.818


12+517.40 28.819 -3.00% -3.00% 28.792 28.981 28.981 28.792
12+518.80 28.792 -3.00% -3.00% 28.765 28.954 28.954 28.765
12+520.20 28.766 -3.00% -3.00% 28.739 28.928 28.928 28.739
12+521.60 28.740 -3.00% -3.00% 28.713 28.902 28.902 28.713
12+523.00 28.714 -3.00% -3.00% 28.687 28.876 28.876 28.687
12+524.40 28.688 -3.00% -3.00% 28.661 28.850 28.850 28.661
12+525.80 28.662 -3.00% -3.00% 28.635 28.824 28.824 28.635
12+527.20 28.635 -3.00% -3.00% 28.608 28.797 28.797 28.608
12+528.60 28.609 -3.00% -3.00% 28.582 28.771 28.771 28.582
12+530.00 28.583 -3.00% -3.00% 28.556 28.745 28.745 28.556
12+531.40 28.557 -3.00% -3.00% 28.530 28.719 28.719 28.530
12+532.80 28.531 -3.00% -3.00% 28.504 28.693 28.693 28.504
12+534.20 28.505 -3.00% -3.00% 28.478 28.667 28.667 28.478
12+535.60 28.478 -3.00% -3.00% 28.451 28.640 28.640 28.451
12+537.00 28.452 -3.00% -3.00% 28.425 28.614 28.614 28.425
12+538.40 28.426 -3.00% -3.00% 28.399 28.588 28.588 28.399
12+539.80 28.400 -3.00% -3.00% 28.373 28.562 28.562 28.373
12+541.20 28.374 -3.00% -3.00% 28.347 28.536 28.536 28.347
12+542.60 28.348 -3.00% -3.00% 28.321 28.510 28.510 28.321
12+544.00 28.321 -3.00% -3.00% 28.294 28.483 28.483 28.294
12+545.40 28.295 -3.00% -3.00% 28.268 28.457 28.457 28.268
12+546.80 28.269 -3.00% -3.00% 28.242 28.431 28.431 28.242
12+548.20 28.243 -3.00% -3.00% 28.216 28.405 28.405 28.216
12+549.60 28.217 -3.00% -3.00% 28.190 28.379 28.379 28.190
12+551.00 28.191 -3.00% -3.00% 28.164 28.353 28.353 28.164
12+552.40 28.164 -3.00% -3.00% 28.137 28.326 28.326 28.137
12+553.80 28.138 -3.00% -3.00% 28.111 28.300 28.300 28.111
12+555.20 28.112 -3.00% -3.00% 28.085 28.274 28.274 28.085
12+556.60 28.086 -3.00% -3.00% 28.059 28.248 28.248 28.059

299 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+558.00 28.060 -3.00% -3.00% 28.033 28.222 28.222 28.033


12+559.40 28.034 -3.00% -3.00% 28.007 28.196 28.196 28.007
12+560.80 28.007 -3.00% -3.00% 27.980 28.169 28.169 27.980
12+562.20 27.981 -3.00% -3.00% 27.954 28.143 28.143 27.954
12+563.60 27.955 -3.00% -3.00% 27.928 28.117 28.117 27.928
12+565.00 27.929 -3.00% -3.00% 27.902 28.091 28.091 27.902
12+566.40 27.903 -3.00% -3.00% 27.876 28.065 28.065 27.876
12+567.80 27.877 -3.00% -3.00% 27.850 28.039 28.039 27.850
12+569.20 27.850 -3.00% -3.00% 27.823 28.012 28.012 27.823
12+570.60 27.824 -3.00% -3.00% 27.797 27.986 27.986 27.797
12+572.00 27.797 -3.00% -3.00% 27.770 27.959 27.959 27.770
12+573.40 27.770 -3.00% -3.00% 27.743 27.932 27.932 27.743
12+574.80 27.742 -3.00% -3.00% 27.715 27.904 27.904 27.715
12+576.20 27.715 -3.00% -3.00% 27.688 27.877 27.877 27.688
12+577.60 27.687 -3.00% -3.00% 27.660 27.849 27.849 27.660
12+579.00 27.660 -3.00% -3.00% 27.633 27.822 27.822 27.633
12+580.40 27.632 -3.00% -3.00% 27.605 27.794 27.794 27.605
12+581.80 27.603 -3.00% -3.00% 27.576 27.765 27.765 27.576
12+583.20 27.575 -3.00% -3.00% 27.548 27.737 27.737 27.548
12+584.60 27.546 -3.00% -3.00% 27.519 27.708 27.708 27.519
12+586.00 27.517 -3.00% -3.00% 27.490 27.679 27.679 27.490
12+587.40 27.488 -3.00% -3.00% 27.461 27.650 27.650 27.461
12+588.80 27.459 -3.00% -3.00% 27.432 27.621 27.621 27.432
12+590.20 27.430 -3.00% -3.00% 27.403 27.592 27.592 27.403
12+591.60 27.400 -3.00% -3.00% 27.373 27.562 27.562 27.373
12+593.00 27.370 -3.00% -3.00% 27.343 27.532 27.532 27.343
12+594.40 27.340 -3.00% -3.00% 27.313 27.502 27.502 27.313
12+595.80 27.310 -3.00% -3.00% 27.283 27.472 27.472 27.283
12+597.20 27.280 -3.00% -3.00% 27.253 27.442 27.442 27.253
12+598.60 27.249 -3.00% -3.00% 27.222 27.411 27.411 27.222

300 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+600.00 27.218 -3.00% -3.00% 27.191 27.380 27.380 27.191


12+601.40 27.187 -3.00% -3.00% 27.160 27.349 27.349 27.160
12+602.80 27.156 -3.00% -3.00% 27.129 27.318 27.318 27.129
12+604.20 27.124 -3.00% -3.00% 27.097 27.286 27.286 27.097
12+605.60 27.093 -3.00% -3.00% 27.066 27.255 27.255 27.066
12+607.00 27.061 -3.00% -3.00% 27.034 27.223 27.223 27.034
12+608.40 27.029 -3.00% -3.00% 27.002 27.191 27.191 27.002
12+609.80 26.997 -3.00% -3.00% 26.970 27.159 27.159 26.970
12+611.20 26.964 -3.00% -3.00% 26.937 27.126 27.126 26.937
12+612.60 26.932 -3.00% -3.00% 26.905 27.094 27.094 26.905
12+614.00 26.899 -3.00% -3.00% 26.872 27.061 27.061 26.872
12+615.40 26.866 -3.00% -3.00% 26.839 27.028 27.028 26.839
12+616.80 26.832 -3.00% -3.00% 26.805 26.994 26.994 26.805
12+618.20 26.799 -3.00% -3.00% 26.772 26.961 26.961 26.772
12+619.60 26.765 -3.00% -3.00% 26.738 26.927 26.927 26.738
12+621.00 26.732 -3.00% -3.00% 26.705 26.894 26.894 26.705
12+622.40 26.697 -3.00% -3.00% 26.670 26.859 26.859 26.670
12+623.80 26.663 -3.00% -3.00% 26.636 26.825 26.825 26.636
12+625.20 26.629 -3.00% -3.00% 26.602 26.791 26.791 26.602
12+626.60 26.594 -3.00% -3.00% 26.567 26.756 26.756 26.567
12+628.00 26.560 -3.00% -3.00% 26.533 26.722 26.722 26.533
12+629.40 26.526 -3.00% -3.00% 26.499 26.688 26.688 26.499
12+630.80 26.491 -3.00% -3.00% 26.464 26.653 26.653 26.464
12+632.20 26.457 -3.00% -3.00% 26.430 26.619 26.619 26.430
12+633.60 26.422 -3.00% -3.00% 26.395 26.584 26.584 26.395
12+635.00 26.388 -3.00% -3.00% 26.361 26.550 26.550 26.361
12+636.40 26.354 -3.00% -3.00% 26.327 26.516 26.516 26.327
12+637.80 26.319 -3.00% -3.00% 26.292 26.481 26.481 26.292
12+639.20 26.285 -3.00% -3.00% 26.258 26.447 26.447 26.258
12+640.60 26.250 -3.00% -3.00% 26.223 26.412 26.412 26.223

301 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+642.00 26.216 -3.00% -3.00% 26.189 26.378 26.378 26.189


12+643.40 26.182 -3.00% -3.00% 26.155 26.344 26.344 26.155
12+644.80 26.147 -3.00% -3.00% 26.120 26.309 26.309 26.120
12+646.20 26.113 -3.00% -3.00% 26.086 26.275 26.275 26.086
12+647.60 26.078 -3.00% -3.00% 26.051 26.240 26.240 26.051
12+649.00 26.044 -3.00% -3.00% 26.017 26.206 26.206 26.017
12+650.40 26.010 -3.00% -3.00% 25.983 26.172 26.172 25.983
12+651.80 25.975 -3.00% -3.00% 25.948 26.137 26.137 25.948
12+653.20 25.941 -3.00% -3.00% 25.914 26.103 26.103 25.914
12+654.60 25.906 -3.00% -3.00% 25.879 26.068 26.068 25.879
12+656.00 25.872 -3.00% -3.00% 25.845 26.034 26.034 25.845
12+657.40 25.838 -3.00% -3.00% 25.811 26.000 26.000 25.811
12+658.80 25.803 -3.00% -3.00% 25.776 25.965 25.965 25.776
12+660.20 25.769 -3.00% -3.00% 25.742 25.931 25.931 25.742
12+661.60 25.734 -3.00% -3.00% 25.707 25.896 25.896 25.707
12+663.00 25.700 -3.00% -3.00% 25.673 25.862 25.862 25.673
12+664.40 25.666 -3.00% -3.00% 25.639 25.828 25.828 25.639
12+665.80 25.631 -3.00% -3.00% 25.604 25.793 25.793 25.604
12+667.20 25.597 -3.00% -3.00% 25.570 25.759 25.759 25.570
12+668.60 25.562 -3.00% -3.00% 25.535 25.724 25.724 25.535
12+670.00 25.528 -3.00% -3.00% 25.501 25.690 25.690 25.501
12+671.40 25.494 -3.00% -3.00% 25.467 25.656 25.656 25.467
12+672.80 25.459 -3.00% -3.00% 25.432 25.621 25.621 25.432
12+674.20 25.425 -3.00% -3.00% 25.398 25.587 25.587 25.398
12+675.60 25.390 -3.00% -3.00% 25.363 25.552 25.552 25.363
12+677.00 25.356 -3.00% -3.00% 25.329 25.518 25.518 25.329
12+678.40 25.322 -3.00% -3.00% 25.295 25.484 25.484 25.295
12+679.80 25.287 -3.00% -3.00% 25.260 25.449 25.449 25.260
12+681.20 25.253 -3.00% -3.00% 25.226 25.415 25.415 25.226
12+682.60 25.218 -3.00% -3.00% 25.191 25.380 25.380 25.191

302 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+684.00 25.184 -3.00% -3.00% 25.157 25.346 25.346 25.157


12+685.40 25.150 -3.00% -3.00% 25.123 25.312 25.312 25.123
12+686.80 25.115 -3.00% -3.00% 25.088 25.277 25.277 25.088
12+688.20 25.081 -3.00% -3.00% 25.054 25.243 25.243 25.054
12+689.60 25.047 -3.00% -3.00% 25.020 25.209 25.209 25.020
12+691.00 25.012 -3.00% -3.00% 24.985 25.174 25.174 24.985
12+692.40 24.978 -3.00% -3.00% 24.951 25.140 25.140 24.951
12+693.80 24.943 -3.00% -3.00% 24.916 25.105 25.105 24.916
12+695.20 24.909 -3.00% -3.00% 24.882 25.071 25.071 24.882
12+696.60 24.875 -3.00% -3.00% 24.848 25.037 25.037 24.848
12+698.00 24.840 -3.00% -3.00% 24.813 25.002 25.002 24.813
12+699.40 24.806 -3.00% -3.00% 24.779 24.968 24.968 24.779
12+700.80 24.771 -3.00% -3.00% 24.744 24.933 24.933 24.744
12+702.20 24.737 -3.00% -3.00% 24.710 24.899 24.899 24.710
12+703.60 24.703 -3.00% -3.00% 24.676 24.865 24.865 24.676
12+705.00 24.668 -3.00% -3.00% 24.641 24.830 24.830 24.641
12+706.40 24.634 -3.00% -3.00% 24.607 24.796 24.796 24.607
12+707.80 24.599 -3.00% -3.00% 24.572 24.761 24.761 24.572
12+709.20 24.565 -3.00% -3.00% 24.538 24.727 24.727 24.538
12+710.60 24.531 -3.00% -3.00% 24.504 24.693 24.693 24.504
12+712.00 24.496 -3.00% -3.00% 24.469 24.658 24.658 24.469
12+713.40 24.462 -3.00% -3.00% 24.435 24.624 24.624 24.435
12+714.80 24.427 -3.00% -3.00% 24.400 24.589 24.589 24.400
12+716.20 24.393 -3.00% -3.00% 24.366 24.555 24.555 24.366
12+717.60 24.359 -3.00% -3.00% 24.332 24.521 24.521 24.332
12+719.00 24.324 -3.00% -3.00% 24.297 24.486 24.486 24.297
12+720.40 24.290 -3.00% -3.00% 24.263 24.452 24.452 24.263
12+721.80 24.255 -3.00% -3.00% 24.228 24.417 24.417 24.228
12+723.20 24.221 -3.00% -3.00% 24.194 24.383 24.383 24.194
12+724.60 24.187 -3.00% -3.00% 24.160 24.349 24.349 24.160

303 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+726.00 24.152 -3.00% -3.00% 24.125 24.314 24.314 24.125


12+727.40 24.118 -3.00% -3.00% 24.091 24.280 24.280 24.091
12+728.80 24.083 -3.00% -3.00% 24.056 24.245 24.245 24.056
12+730.20 24.049 -3.00% -3.00% 24.022 24.211 24.211 24.022
12+731.60 24.015 -3.00% -3.00% 23.988 24.177 24.177 23.988
12+733.00 23.980 -3.00% -3.00% 23.953 24.142 24.142 23.953
12+734.40 23.946 -3.00% -3.00% 23.919 24.108 24.108 23.919
12+735.80 23.911 -3.00% -3.00% 23.884 24.073 24.073 23.884
12+737.20 23.877 -3.00% -3.00% 23.850 24.039 24.039 23.850
12+738.60 23.843 -3.00% -3.00% 23.816 24.005 24.005 23.816
12+740.00 23.808 -3.00% -3.00% 23.781 23.970 23.970 23.781
12+741.40 23.774 -3.00% -3.00% 23.747 23.936 23.936 23.747
12+742.80 23.739 -3.00% -3.00% 23.712 23.901 23.901 23.712
12+744.20 23.705 -3.00% -3.00% 23.678 23.867 23.867 23.678
12+745.60 23.671 -3.00% -3.00% 23.644 23.833 23.833 23.644
12+747.00 23.636 -3.00% -3.00% 23.609 23.798 23.798 23.609
12+748.40 23.602 -3.00% -3.00% 23.575 23.764 23.764 23.575
12+749.80 23.567 -3.00% -3.00% 23.540 23.729 23.729 23.540
12+751.20 23.533 -3.00% -3.00% 23.506 23.695 23.695 23.506
12+752.60 23.499 -3.00% -3.00% 23.472 23.661 23.661 23.472
12+754.00 23.464 -3.00% -3.00% 23.437 23.626 23.626 23.437
12+755.40 23.430 -3.00% -3.00% 23.403 23.592 23.592 23.403
12+756.80 23.395 -3.00% -3.00% 23.368 23.557 23.557 23.368
12+758.20 23.361 -3.00% -3.00% 23.334 23.523 23.523 23.334
12+759.60 23.327 -3.00% -3.00% 23.300 23.489 23.489 23.300
12+761.00 23.292 -3.00% -3.00% 23.265 23.454 23.454 23.265
12+762.40 23.258 -3.00% -3.00% 23.231 23.420 23.420 23.231
12+763.80 23.223 -3.00% -3.00% 23.196 23.385 23.385 23.196
12+765.20 23.189 -3.00% -3.00% 23.162 23.351 23.351 23.162
12+766.60 23.155 -3.00% -3.00% 23.128 23.317 23.317 23.128

304 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+768.00 23.120 -3.00% -3.00% 23.093 23.282 23.282 23.093


12+769.40 23.086 -3.00% -3.00% 23.059 23.248 23.248 23.059
12+770.80 23.051 -3.00% -3.00% 23.024 23.213 23.213 23.024
12+772.20 23.017 -3.00% -3.00% 22.990 23.179 23.179 22.990
12+773.60 22.983 -3.00% -3.00% 22.956 23.145 23.145 22.956
12+775.00 22.948 -3.00% -3.00% 22.921 23.110 23.110 22.921
12+776.40 22.914 -3.00% -3.00% 22.887 23.076 23.076 22.887
12+777.80 22.879 -3.00% -3.00% 22.852 23.041 23.041 22.852
12+779.20 22.845 -3.00% -3.00% 22.818 23.007 23.007 22.818
12+780.60 22.811 -3.00% -3.00% 22.784 22.973 22.973 22.784
12+782.00 22.776 -3.00% -3.00% 22.749 22.938 22.938 22.749
12+783.40 22.742 -3.00% -3.00% 22.715 22.904 22.904 22.715
12+784.80 22.707 -3.00% -3.00% 22.680 22.869 22.869 22.680
12+786.20 22.673 -3.00% -3.00% 22.646 22.835 22.835 22.646
12+787.60 22.639 -3.00% -3.00% 22.612 22.801 22.801 22.612
12+789.00 22.604 -3.00% -3.00% 22.577 22.766 22.766 22.577
12+790.40 22.570 -3.00% -3.00% 22.543 22.732 22.732 22.543
12+791.80 22.535 -3.00% -3.00% 22.508 22.697 22.697 22.508
12+793.20 22.501 -3.00% -3.00% 22.474 22.663 22.663 22.474
12+794.60 22.467 -3.00% -3.00% 22.440 22.629 22.629 22.440
12+796.00 22.432 -3.00% -3.00% 22.405 22.594 22.594 22.405
12+797.40 22.398 -3.00% -3.00% 22.371 22.560 22.560 22.371
12+798.80 22.363 -3.00% -3.00% 22.336 22.525 22.525 22.336
12+800.20 22.329 -3.00% -3.00% 22.302 22.491 22.491 22.302
12+801.60 22.295 -3.00% -3.00% 22.268 22.457 22.457 22.268
12+803.00 22.260 -3.00% -3.00% 22.233 22.422 22.422 22.233
12+804.40 22.226 -3.00% -3.00% 22.199 22.388 22.388 22.199
12+805.80 22.191 -3.00% -3.00% 22.164 22.353 22.353 22.164
12+807.20 22.157 -3.00% -3.00% 22.130 22.319 22.319 22.130
12+808.60 22.123 -3.00% -3.00% 22.096 22.285 22.285 22.096

305 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+810.00 22.088 -3.00% -3.00% 22.061 22.250 22.250 22.061


12+811.40 22.054 -3.00% -3.00% 22.027 22.216 22.216 22.027
12+812.80 22.019 -3.00% -3.00% 21.992 22.181 22.181 21.992
12+814.20 21.985 -3.00% -3.00% 21.958 22.147 22.147 21.958
12+815.60 21.951 -3.00% -3.00% 21.924 22.113 22.113 21.924
12+817.00 21.916 -3.00% -3.00% 21.889 22.078 22.078 21.889
12+818.40 21.882 -3.00% -3.00% 21.855 22.044 22.044 21.855
12+819.80 21.847 -3.00% -3.00% 21.820 22.009 22.009 21.820
12+821.20 21.813 -3.00% -3.00% 21.786 21.975 21.975 21.786
12+822.60 21.779 -3.00% -3.00% 21.752 21.941 21.941 21.752
12+824.00 21.744 -3.00% -3.00% 21.717 21.906 21.906 21.717
12+825.40 21.710 -3.00% -3.00% 21.683 21.872 21.872 21.683
12+826.80 21.675 -3.00% -3.00% 21.648 21.837 21.837 21.648
12+828.20 21.641 -3.00% -3.00% 21.614 21.803 21.803 21.614
12+829.60 21.607 -3.00% -3.00% 21.580 21.769 21.769 21.580
12+831.00 21.572 -3.00% -3.00% 21.545 21.734 21.734 21.545
12+832.40 21.538 -3.00% -3.00% 21.511 21.700 21.700 21.511
12+833.80 21.503 -3.00% -3.00% 21.476 21.665 21.665 21.476
12+835.20 21.469 -3.00% -3.00% 21.442 21.631 21.631 21.442
12+836.60 21.435 -3.00% -3.00% 21.408 21.597 21.597 21.408
12+838.00 21.400 -3.00% -3.00% 21.373 21.562 21.562 21.373
12+839.40 21.366 -3.00% -3.00% 21.339 21.528 21.528 21.339
12+840.80 21.331 -3.00% -3.00% 21.304 21.493 21.493 21.304
12+842.20 21.297 -3.00% -3.00% 21.270 21.459 21.459 21.270
12+843.60 21.263 -3.00% -3.00% 21.236 21.425 21.425 21.236
12+845.00 21.228 -3.00% -3.00% 21.201 21.390 21.390 21.201
12+846.40 21.194 -3.00% -3.00% 21.167 21.356 21.356 21.167
12+847.80 21.159 -3.00% -3.00% 21.132 21.321 21.321 21.132
12+849.20 21.125 -3.00% -3.00% 21.098 21.287 21.287 21.098
12+850.60 21.091 -3.00% -3.00% 21.064 21.253 21.253 21.064

306 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+852.00 21.056 -3.00% -3.00% 21.029 21.218 21.218 21.029


12+853.40 21.022 -3.00% -3.00% 20.995 21.184 21.184 20.995
12+854.80 20.987 -3.00% -3.00% 20.960 21.149 21.149 20.960
12+856.20 20.953 -3.00% -3.00% 20.926 21.115 21.115 20.926
12+857.60 20.919 -3.00% -3.00% 20.892 21.081 21.081 20.892
12+859.00 20.884 -3.00% -3.00% 20.857 21.046 21.046 20.857
12+860.40 20.850 -3.00% -3.00% 20.823 21.012 21.012 20.823
12+861.80 20.815 -3.00% -3.00% 20.788 20.977 20.977 20.788
12+863.20 20.781 -3.00% -3.00% 20.754 20.943 20.943 20.754
12+864.60 20.747 -3.00% -3.00% 20.720 20.909 20.909 20.720
12+866.00 20.712 -3.00% -3.00% 20.685 20.874 20.874 20.685
12+867.40 20.678 -3.00% -3.00% 20.651 20.840 20.840 20.651
12+868.80 20.643 -3.00% -3.00% 20.616 20.805 20.805 20.616
12+870.20 20.609 -3.00% -3.00% 20.582 20.771 20.771 20.582
12+871.60 20.575 -3.00% -3.00% 20.548 20.737 20.737 20.548
12+873.00 20.540 -3.00% -3.00% 20.513 20.702 20.702 20.513
12+874.40 20.506 -3.00% -3.00% 20.479 20.668 20.668 20.479
12+875.80 20.471 -3.00% -3.00% 20.444 20.633 20.633 20.444
12+877.20 20.437 -3.00% -3.00% 20.410 20.599 20.599 20.410
12+878.60 20.403 -3.00% -3.00% 20.376 20.565 20.565 20.376
12+880.00 20.368 -3.00% -3.00% 20.341 20.530 20.530 20.341
12+881.40 20.334 -3.00% -3.00% 20.307 20.496 20.496 20.307
12+882.80 20.299 -3.00% -3.00% 20.272 20.461 20.461 20.272
12+884.20 20.265 -3.00% -3.00% 20.238 20.427 20.427 20.238
12+885.60 20.231 -3.00% -3.00% 20.204 20.393 20.393 20.204
12+887.00 20.196 -3.00% -3.00% 20.169 20.358 20.358 20.169
12+888.40 20.162 -3.00% -3.00% 20.135 20.324 20.324 20.135
12+889.80 20.127 -3.00% -3.00% 20.100 20.289 20.289 20.100
12+891.20 20.093 -3.00% -3.00% 20.066 20.255 20.255 20.066
12+892.60 20.059 -3.00% -3.00% 20.032 20.221 20.221 20.032

307 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+894.00 20.024 -3.00% -3.00% 19.997 20.186 20.186 19.997


12+895.40 19.990 -3.00% -3.00% 19.963 20.152 20.152 19.963
12+896.80 19.955 -3.00% -3.00% 19.928 20.117 20.117 19.928
12+898.20 19.921 -3.00% -3.00% 19.894 20.083 20.083 19.894
12+899.60 19.887 -3.00% -3.00% 19.860 20.049 20.049 19.860
12+901.00 19.852 -3.00% -3.00% 19.825 20.014 20.014 19.825
12+902.40 19.818 -3.00% -3.00% 19.791 19.980 19.980 19.791
12+903.80 19.784 -3.00% -3.00% 19.757 19.946 19.946 19.757
12+905.20 19.749 -3.00% -3.00% 19.722 19.911 19.911 19.722
12+906.60 19.715 -3.00% -3.00% 19.688 19.877 19.877 19.688
12+908.00 19.680 -3.00% -3.00% 19.653 19.842 19.842 19.653
12+909.40 19.646 -3.00% -3.00% 19.619 19.808 19.808 19.619
12+910.80 19.612 -3.00% -3.00% 19.585 19.774 19.774 19.585
12+912.20 19.577 -3.00% -3.00% 19.550 19.739 19.739 19.550
12+913.60 19.543 -3.00% -3.00% 19.516 19.705 19.705 19.516
12+915.00 19.508 -3.00% -3.00% 19.481 19.670 19.670 19.481
12+916.40 19.474 -3.00% -3.00% 19.447 19.636 19.636 19.447
12+917.80 19.440 -3.00% -3.00% 19.413 19.602 19.602 19.413
12+919.20 19.405 -3.00% -3.00% 19.378 19.567 19.567 19.378
12+920.60 19.371 -3.00% -3.00% 19.344 19.533 19.533 19.344
12+922.00 19.336 -3.00% -3.00% 19.309 19.498 19.498 19.309
12+923.40 19.302 -3.00% -3.00% 19.275 19.464 19.464 19.275
12+924.80 19.268 -3.00% -3.00% 19.241 19.430 19.430 19.241
12+926.20 19.233 -3.00% -3.00% 19.206 19.395 19.395 19.206
12+927.60 19.199 -3.00% -3.00% 19.172 19.361 19.361 19.172
12+929.00 19.164 -3.00% -3.00% 19.137 19.326 19.326 19.137
12+930.40 19.130 -3.00% -3.00% 19.103 19.292 19.292 19.103
12+931.80 19.096 -3.00% -3.00% 19.069 19.258 19.258 19.069
12+933.20 19.061 -3.00% -3.00% 19.034 19.223 19.223 19.034
12+934.60 19.027 -3.00% -3.00% 19.000 19.189 19.189 19.000

308 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+936.00 18.992 -3.00% -3.00% 18.965 19.154 19.154 18.965


12+937.40 18.958 -3.00% -3.00% 18.931 19.120 19.120 18.931
12+938.80 18.924 -3.00% -3.00% 18.897 19.086 19.086 18.897
12+940.20 18.889 -3.00% -3.00% 18.862 19.051 19.051 18.862
12+941.60 18.855 -3.00% -3.00% 18.828 19.017 19.017 18.828
12+943.00 18.820 -3.00% -3.00% 18.793 18.982 18.982 18.793
12+944.40 18.786 -3.00% -3.00% 18.759 18.948 18.948 18.759
12+945.80 18.752 -3.00% -3.00% 18.725 18.914 18.914 18.725
12+947.20 18.717 -3.00% -3.00% 18.690 18.879 18.879 18.690
12+948.60 18.683 -3.00% -3.00% 18.656 18.845 18.845 18.656
12+950.00 18.648 -3.00% -3.00% 18.621 18.810 18.810 18.621
12+951.40 18.614 -3.00% -3.00% 18.587 18.776 18.776 18.587
12+952.80 18.580 -3.00% -3.00% 18.553 18.742 18.742 18.553
12+954.20 18.545 -3.00% -3.00% 18.518 18.707 18.707 18.518
12+955.60 18.511 -3.00% -3.00% 18.484 18.673 18.673 18.484
12+957.00 18.476 -3.00% -3.00% 18.449 18.638 18.638 18.449
12+958.40 18.442 -3.00% -3.00% 18.415 18.604 18.604 18.415
12+959.80 18.408 -3.00% -3.00% 18.381 18.570 18.570 18.381
12+961.20 18.373 -3.00% -3.00% 18.346 18.535 18.535 18.346
12+962.60 18.339 -3.00% -3.00% 18.312 18.501 18.501 18.312
12+964.00 18.304 -3.00% -3.00% 18.277 18.466 18.466 18.277
12+965.40 18.270 -3.00% -3.00% 18.243 18.432 18.432 18.243
12+966.80 18.236 -3.00% -3.00% 18.209 18.398 18.398 18.209
12+968.20 18.201 -3.00% -3.00% 18.174 18.363 18.363 18.174
12+969.60 18.167 -3.00% -3.00% 18.140 18.329 18.329 18.140
12+971.00 18.132 -3.00% -3.00% 18.105 18.294 18.294 18.105
12+972.40 18.098 -3.00% -3.00% 18.071 18.260 18.260 18.071
12+973.80 18.064 -3.00% -3.00% 18.037 18.226 18.226 18.037
12+975.20 18.029 -3.00% -3.00% 18.002 18.191 18.191 18.002
12+976.60 17.995 -3.00% -3.00% 17.968 18.157 18.157 17.968

309 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

12+978.00 17.960 -3.00% -3.00% 17.933 18.122 18.122 17.933


12+979.40 17.926 -3.00% -3.00% 17.899 18.088 18.088 17.899
12+980.80 17.892 -3.00% -3.00% 17.865 18.054 18.054 17.865
12+982.20 17.857 -3.00% -3.00% 17.830 18.019 18.019 17.830
12+983.60 17.823 -3.00% -3.00% 17.796 17.985 17.985 17.796
12+985.00 17.788 -3.00% -3.00% 17.761 17.950 17.950 17.761
12+986.40 17.754 -3.00% -3.00% 17.727 17.916 17.916 17.727
12+987.80 17.720 -3.00% -3.00% 17.693 17.882 17.882 17.693
12+989.20 17.686 -3.00% -3.00% 17.659 17.848 17.848 17.659
12+990.60 17.652 -3.00% -3.00% 17.625 17.814 17.814 17.625
12+992.00 17.619 -3.00% -3.00% 17.592 17.781 17.781 17.592
12+993.40 17.586 -3.00% -3.00% 17.559 17.748 17.748 17.559
12+994.80 17.553 -3.00% -3.00% 17.526 17.715 17.715 17.526
12+996.20 17.521 -3.00% -3.00% 17.494 17.683 17.683 17.494
12+997.60 17.488 -3.00% -3.00% 17.461 17.650 17.650 17.461
12+999.00 17.456 -3.00% -3.00% 17.429 17.618 17.618 17.429
13+000.40 17.425 -3.00% -3.00% 17.398 17.587 17.587 17.398
13+001.80 17.393 -3.00% -3.00% 17.366 17.555 17.555 17.366
13+003.20 17.362 -3.00% -3.00% 17.335 17.524 17.524 17.335
13+004.60 17.331 -3.00% -3.00% 17.304 17.493 17.493 17.304
13+006.00 17.300 -3.00% -3.00% 17.273 17.462 17.462 17.273
13+007.40 17.270 -3.00% -3.00% 17.243 17.432 17.432 17.243
13+008.80 17.240 -3.00% -3.00% 17.213 17.402 17.402 17.213
13+010.20 17.210 -3.00% -3.00% 17.183 17.372 17.372 17.183
13+011.60 17.180 -3.00% -3.00% 17.153 17.342 17.342 17.153
13+013.00 17.151 -3.00% -3.00% 17.124 17.313 17.313 17.124
13+014.40 17.122 -3.00% -3.00% 17.095 17.284 17.284 17.095
13+015.80 17.093 -3.00% -3.00% 17.066 17.255 17.255 17.066
13+017.20 17.065 -3.00% -3.00% 17.038 17.227 17.227 17.038
13+018.60 17.036 -3.00% -3.00% 17.009 17.198 17.198 17.009

310 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+020.00 17.008 -3.00% -3.00% 16.981 17.170 17.170 16.981


13+021.40 16.981 -3.00% -3.00% 16.954 17.143 17.143 16.954
13+022.80 16.953 -3.00% -3.00% 16.926 17.115 17.115 16.926
13+024.20 16.926 -3.00% -3.00% 16.899 17.088 17.088 16.899
13+025.60 16.899 -3.00% -3.00% 16.872 17.061 17.061 16.872
13+027.00 16.872 -3.00% -3.00% 16.845 17.034 17.034 16.845
13+028.40 16.846 -3.00% -3.00% 16.819 17.008 17.008 16.819
13+029.80 16.820 -3.00% -3.00% 16.793 16.982 16.982 16.793
13+031.20 16.794 -3.00% -3.00% 16.767 16.956 16.956 16.767
13+032.60 16.768 -3.00% -3.00% 16.741 16.930 16.930 16.741
13+034.00 16.743 -3.00% -3.00% 16.716 16.905 16.905 16.716
13+035.40 16.718 -3.00% -3.00% 16.691 16.880 16.880 16.691
13+036.80 16.693 -3.00% -3.00% 16.666 16.855 16.855 16.666
13+038.20 16.669 -3.00% -3.00% 16.642 16.831 16.831 16.642
13+039.60 16.644 -3.00% -3.00% 16.617 16.806 16.806 16.617
13+041.00 16.620 -3.00% -3.00% 16.593 16.782 16.782 16.593
13+042.40 16.597 -3.00% -3.00% 16.570 16.759 16.759 16.570
13+043.80 16.573 -3.00% -3.00% 16.546 16.735 16.735 16.546
13+045.20 16.550 -3.00% -3.00% 16.523 16.712 16.712 16.523
13+046.60 16.527 -3.00% -3.00% 16.500 16.689 16.689 16.500
13+048.00 16.505 -3.00% -3.00% 16.478 16.667 16.667 16.478
13+049.40 16.482 -3.00% -3.00% 16.455 16.644 16.644 16.455
13+050.80 16.460 -3.00% -3.00% 16.433 16.622 16.622 16.433
13+052.20 16.438 -3.00% -3.00% 16.411 16.600 16.600 16.411
13+053.60 16.417 -3.00% -3.00% 16.390 16.579 16.579 16.390
13+055.00 16.395 -3.00% -3.00% 16.368 16.557 16.557 16.368
13+056.40 16.374 -3.00% -3.00% 16.347 16.536 16.536 16.347
13+057.80 16.353 -3.00% -3.00% 16.326 16.515 16.515 16.326
13+059.20 16.333 -3.00% -3.00% 16.306 16.495 16.495 16.306
13+060.60 16.313 -3.00% -3.00% 16.286 16.475 16.475 16.286

311 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+062.00 16.293 -3.00% -3.00% 16.266 16.455 16.455 16.266


13+063.40 16.273 -3.00% -3.00% 16.246 16.435 16.435 16.246
13+064.80 16.254 -3.00% -3.00% 16.227 16.416 16.416 16.227
13+066.20 16.234 -3.00% -3.00% 16.207 16.396 16.396 16.207
13+067.60 16.215 -3.00% -3.00% 16.188 16.377 16.377 16.188
13+069.00 16.197 -3.00% -3.00% 16.170 16.359 16.359 16.170
13+070.40 16.178 -3.00% -3.00% 16.151 16.340 16.340 16.151
13+071.80 16.160 -3.00% -3.00% 16.133 16.322 16.322 16.133
13+073.20 16.142 -3.00% -3.00% 16.115 16.304 16.304 16.115
13+074.60 16.125 -3.00% -3.00% 16.098 16.287 16.287 16.098
13+076.00 16.108 -3.00% -3.00% 16.081 16.270 16.270 16.081
13+077.40 16.091 -3.00% -3.00% 16.064 16.253 16.253 16.064
13+078.80 16.074 -3.00% -3.00% 16.047 16.236 16.236 16.047
13+080.20 16.057 -3.00% -3.00% 16.030 16.219 16.219 16.030
13+081.60 16.041 -3.00% -3.00% 16.014 16.203 16.203 16.014
13+083.00 16.025 -3.00% -3.00% 15.998 16.187 16.187 15.998
13+084.40 16.009 -3.00% -3.00% 15.982 16.171 16.171 15.982
13+085.80 15.993 -3.00% -3.00% 15.966 16.155 16.155 15.966
13+087.20 15.977 -3.00% -3.00% 15.950 16.139 16.139 15.950
13+088.60 15.961 -3.00% -3.00% 15.934 16.123 16.123 15.934
13+090.00 15.945 -3.00% -3.00% 15.918 16.107 16.107 15.918
13+091.40 15.929 -3.00% -3.00% 15.902 16.091 16.091 15.902
13+092.80 15.913 -3.00% -3.00% 15.886 16.075 16.075 15.886
13+094.20 15.897 -3.00% -3.00% 15.870 16.059 16.059 15.870
13+095.60 15.881 -3.00% -3.00% 15.854 16.043 16.043 15.854
13+097.00 15.865 -3.00% -3.00% 15.838 16.027 16.027 15.838
13+098.40 15.849 -3.00% -3.00% 15.822 16.011 16.011 15.822
13+099.80 15.833 -3.00% -3.00% 15.806 15.995 15.995 15.806
13+101.20 15.817 -3.00% -3.00% 15.790 15.979 15.979 15.790
13+102.60 15.801 -3.00% -3.00% 15.774 15.963 15.963 15.774

312 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+104.00 15.785 -3.00% -3.00% 15.758 15.947 15.947 15.758


13+105.40 15.769 -3.00% -3.00% 15.742 15.931 15.931 15.742
13+106.80 15.753 -3.00% -3.00% 15.726 15.915 15.915 15.726
13+108.20 15.737 -3.00% -3.00% 15.710 15.899 15.899 15.710
13+109.60 15.721 -3.00% -3.00% 15.694 15.883 15.883 15.694
13+111.00 15.705 -3.00% -3.00% 15.678 15.867 15.867 15.678
13+112.40 15.688 -3.00% -3.00% 15.661 15.850 15.850 15.661
13+113.80 15.672 -3.00% -3.00% 15.645 15.834 15.834 15.645
13+115.20 15.656 -3.00% -3.00% 15.629 15.818 15.818 15.629
13+116.60 15.640 -3.00% -3.00% 15.613 15.802 15.802 15.613
13+118.00 15.624 -3.00% -3.00% 15.597 15.786 15.786 15.597
13+119.40 15.608 -3.00% -3.00% 15.581 15.770 15.770 15.581
13+120.80 15.592 -3.00% -3.00% 15.565 15.754 15.754 15.565
13+122.20 15.576 -3.00% -3.00% 15.549 15.738 15.738 15.549
13+123.60 15.560 -3.00% -3.00% 15.533 15.722 15.722 15.533
13+125.00 15.544 -3.00% -3.00% 15.517 15.706 15.706 15.517
13+126.40 15.528 -3.00% -3.00% 15.501 15.690 15.690 15.501
13+127.80 15.512 -3.00% -3.00% 15.485 15.674 15.674 15.485
13+129.20 15.496 -3.00% -3.00% 15.469 15.658 15.658 15.469
13+130.60 15.480 -3.00% -3.00% 15.453 15.642 15.642 15.453
13+132.00 15.464 -3.00% -3.00% 15.437 15.626 15.626 15.437
13+133.40 15.448 -3.00% -3.00% 15.421 15.610 15.610 15.421
13+134.80 15.432 -3.00% -3.00% 15.405 15.594 15.594 15.405
13+136.20 15.416 -3.00% -3.00% 15.389 15.578 15.578 15.389
13+137.60 15.400 -3.00% -3.00% 15.373 15.562 15.562 15.373
13+139.00 15.384 -3.00% -3.00% 15.357 15.546 15.546 15.357
13+140.40 15.368 -3.00% -3.00% 15.341 15.530 15.530 15.341
13+141.80 15.352 -3.00% -3.00% 15.325 15.514 15.514 15.325
13+143.20 15.336 -3.00% -3.00% 15.309 15.498 15.498 15.309
13+144.60 15.320 -3.00% -3.00% 15.293 15.482 15.482 15.293

313 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+146.00 15.304 -3.00% -3.00% 15.277 15.466 15.466 15.277


13+147.40 15.288 -3.00% -3.00% 15.261 15.450 15.450 15.261
13+148.80 15.272 -3.00% -3.00% 15.245 15.434 15.434 15.245
13+150.20 15.256 -3.00% -3.00% 15.229 15.418 15.418 15.229
13+151.60 15.240 -3.00% -3.00% 15.213 15.402 15.402 15.213
13+153.00 15.224 -3.00% -3.00% 15.197 15.386 15.386 15.197
13+154.40 15.208 -3.00% -3.00% 15.181 15.370 15.370 15.181
13+155.80 15.192 -3.00% -3.00% 15.165 15.354 15.354 15.165
13+157.20 15.176 -3.00% -3.00% 15.149 15.338 15.338 15.149
13+158.60 15.160 -3.00% -3.00% 15.133 15.322 15.322 15.133
13+160.00 15.144 -3.00% -3.00% 15.117 15.306 15.306 15.117
13+161.40 15.128 -3.00% -3.00% 15.101 15.290 15.290 15.101
13+162.80 15.112 -3.00% -3.00% 15.085 15.274 15.274 15.085
13+164.20 15.096 -3.00% -3.00% 15.069 15.258 15.258 15.069
13+165.60 15.080 -3.00% -3.00% 15.053 15.242 15.242 15.053
13+167.00 15.064 -3.00% -3.00% 15.037 15.226 15.226 15.037
13+168.40 15.048 -3.00% -3.00% 15.021 15.210 15.210 15.021
13+169.80 15.031 -3.00% -3.00% 15.004 15.193 15.193 15.004
13+171.20 15.015 -3.00% -3.00% 14.988 15.177 15.177 14.988
13+172.60 14.999 -3.00% -3.00% 14.972 15.161 15.161 14.972
13+174.00 14.983 -3.00% -3.00% 14.956 15.145 15.145 14.956
13+175.40 14.967 -3.00% -3.00% 14.940 15.129 15.129 14.940
13+176.80 14.951 -3.00% -3.00% 14.924 15.113 15.113 14.924
13+178.20 14.935 -3.00% -3.00% 14.908 15.097 15.097 14.908
13+179.60 14.919 -3.00% -3.00% 14.892 15.081 15.081 14.892
13+181.00 14.903 -3.00% -3.00% 14.876 15.065 15.065 14.876
13+182.40 14.887 -3.00% -3.00% 14.860 15.049 15.049 14.860
13+183.80 14.871 -3.00% -3.00% 14.844 15.033 15.033 14.844
13+185.20 14.855 -3.00% -3.00% 14.828 15.017 15.017 14.828
13+186.60 14.839 -3.00% -3.00% 14.812 15.001 15.001 14.812

314 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+188.00 14.823 -3.00% -3.00% 14.796 14.985 14.985 14.796


13+189.40 14.807 -3.00% -3.00% 14.780 14.969 14.969 14.780
13+190.80 14.791 -3.00% -3.00% 14.764 14.953 14.953 14.764
13+192.20 14.775 -3.00% -3.00% 14.748 14.937 14.937 14.748
13+193.60 14.759 -3.00% -3.00% 14.732 14.921 14.921 14.732
13+195.00 14.743 -3.00% -3.00% 14.716 14.905 14.905 14.716
13+196.40 14.727 -3.00% -3.00% 14.700 14.889 14.889 14.700
13+197.80 14.711 -3.00% -3.00% 14.684 14.873 14.873 14.684
13+199.20 14.695 -3.00% -3.00% 14.668 14.857 14.857 14.668
13+200.60 14.679 -3.00% -3.00% 14.652 14.841 14.841 14.652
13+202.00 14.663 -3.00% -3.00% 14.636 14.825 14.825 14.636
13+203.40 14.647 -3.00% -3.00% 14.620 14.809 14.809 14.620
13+204.80 14.631 -3.00% -3.00% 14.604 14.793 14.793 14.604
13+206.20 14.615 -3.00% -3.00% 14.588 14.777 14.777 14.588
13+207.60 14.599 -3.00% -3.00% 14.572 14.761 14.761 14.572
13+209.00 14.583 -3.00% -3.00% 14.556 14.745 14.745 14.556
13+210.40 14.567 -3.00% -3.00% 14.540 14.729 14.729 14.540
13+211.80 14.551 -3.00% -3.00% 14.524 14.713 14.713 14.524
13+213.20 14.535 -3.00% -3.00% 14.508 14.697 14.697 14.508
13+214.60 14.519 -3.00% -3.00% 14.492 14.681 14.681 14.492
13+216.00 14.503 -3.00% -3.00% 14.476 14.665 14.665 14.476
13+217.40 14.487 -3.00% -3.00% 14.460 14.649 14.649 14.460
13+218.80 14.471 -3.00% -3.00% 14.444 14.633 14.633 14.444
13+220.20 14.455 -3.00% -3.00% 14.428 14.617 14.617 14.428
13+221.60 14.439 -3.00% -3.00% 14.412 14.601 14.601 14.412
13+223.00 14.423 -3.00% -3.00% 14.396 14.585 14.585 14.396
13+224.40 14.407 -3.00% -3.00% 14.380 14.569 14.569 14.380
13+225.80 14.391 -3.00% -3.00% 14.364 14.553 14.553 14.364
13+227.20 14.374 -3.00% -3.00% 14.347 14.536 14.536 14.347
13+228.60 14.358 -3.00% -3.00% 14.331 14.520 14.520 14.331

315 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+230.00 14.342 -3.00% -3.00% 14.315 14.504 14.504 14.315


13+231.40 14.326 -3.00% -3.00% 14.299 14.488 14.488 14.299
13+232.80 14.310 -3.00% -3.00% 14.283 14.472 14.472 14.283
13+234.20 14.294 -3.00% -3.00% 14.267 14.456 14.456 14.267
13+235.60 14.278 -3.00% -3.00% 14.251 14.440 14.440 14.251
13+237.00 14.262 -3.00% -3.00% 14.235 14.424 14.424 14.235
13+238.40 14.246 -3.00% -3.00% 14.219 14.408 14.408 14.219
13+239.80 14.230 -3.00% -3.00% 14.203 14.392 14.392 14.203
13+241.20 14.214 -3.00% -3.00% 14.187 14.376 14.376 14.187
13+242.60 14.198 -3.00% -3.00% 14.171 14.360 14.360 14.171
13+244.00 14.182 -3.00% -3.00% 14.155 14.344 14.344 14.155
13+245.40 14.166 -3.00% -3.00% 14.139 14.328 14.328 14.139
13+246.80 14.150 -3.00% -3.00% 14.123 14.312 14.312 14.123
13+248.20 14.134 -3.00% -3.00% 14.107 14.296 14.296 14.107
13+249.60 14.118 -3.00% -3.00% 14.091 14.280 14.280 14.091
13+251.00 14.102 -3.00% -3.00% 14.075 14.264 14.264 14.075
13+252.40 14.086 -3.00% -3.00% 14.059 14.248 14.248 14.059
13+253.80 14.070 -3.00% -3.00% 14.043 14.232 14.232 14.043
13+255.20 14.054 -3.00% -3.00% 14.027 14.216 14.216 14.027
13+256.60 14.038 -3.00% -3.00% 14.011 14.200 14.200 14.011
13+258.00 14.022 -3.00% -3.00% 13.995 14.184 14.184 13.995
13+259.40 14.006 -3.00% -3.00% 13.979 14.168 14.168 13.979
13+260.80 13.990 -3.00% -3.00% 13.963 14.152 14.152 13.963
13+262.20 13.974 -3.00% -3.00% 13.947 14.136 14.136 13.947
13+263.60 13.958 -3.00% -3.00% 13.931 14.120 14.120 13.931
13+265.00 13.942 -3.00% -3.00% 13.915 14.104 14.104 13.915
13+266.40 13.926 -3.00% -3.00% 13.899 14.088 14.088 13.899
13+267.80 13.910 -3.00% -3.00% 13.883 14.072 14.072 13.883
13+269.20 13.894 -3.00% -3.00% 13.867 14.056 14.056 13.867
13+270.60 13.878 -3.00% -3.00% 13.851 14.040 14.040 13.851

316 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+272.00 13.862 -3.00% -3.00% 13.835 14.024 14.024 13.835


13+273.40 13.846 -3.00% -3.00% 13.819 14.008 14.008 13.819
13+274.80 13.830 -3.00% -3.00% 13.803 13.992 13.992 13.803
13+276.20 13.814 -3.00% -3.00% 13.787 13.976 13.976 13.787
13+277.60 13.798 -3.00% -3.00% 13.771 13.960 13.960 13.771
13+279.00 13.782 -3.00% -3.00% 13.755 13.944 13.944 13.755
13+280.40 13.766 -3.00% -3.00% 13.739 13.928 13.928 13.739
13+281.80 13.750 -3.00% -3.00% 13.723 13.912 13.912 13.723
13+283.20 13.734 -3.00% -3.00% 13.707 13.896 13.896 13.707
13+284.60 13.718 -3.00% -3.00% 13.691 13.880 13.880 13.691
13+286.00 13.701 -3.00% -3.00% 13.674 13.863 13.863 13.674
13+287.40 13.685 -3.00% -3.00% 13.658 13.847 13.847 13.658
13+288.80 13.669 -3.00% -3.00% 13.642 13.831 13.831 13.642
13+290.20 13.653 -3.00% -3.00% 13.626 13.815 13.815 13.626
13+291.60 13.637 -3.00% -3.00% 13.610 13.799 13.799 13.610
13+293.00 13.621 -3.00% -3.00% 13.594 13.783 13.783 13.594
13+294.40 13.605 -3.00% -3.00% 13.578 13.767 13.767 13.578
13+295.80 13.589 -3.00% -3.00% 13.562 13.751 13.751 13.562
13+297.20 13.573 -3.00% -3.00% 13.546 13.735 13.735 13.546
13+298.60 13.557 -3.00% -3.00% 13.530 13.719 13.719 13.530
13+300.00 13.541 -3.00% -3.00% 13.514 13.703 13.703 13.514
13+301.40 13.525 -3.00% -3.00% 13.498 13.687 13.687 13.498
13+302.80 13.509 -3.00% -3.00% 13.482 13.671 13.671 13.482
13+304.20 13.493 -3.00% -3.00% 13.466 13.655 13.655 13.466
13+305.60 13.477 -3.00% -3.00% 13.450 13.639 13.639 13.450
13+307.00 13.461 -3.00% -3.00% 13.434 13.623 13.623 13.434
13+308.40 13.445 -3.00% -3.00% 13.418 13.607 13.607 13.418
13+309.80 13.429 -3.00% -3.00% 13.402 13.591 13.591 13.402
13+311.20 13.413 -3.00% -3.00% 13.386 13.575 13.575 13.386
13+312.60 13.397 -3.00% -3.00% 13.370 13.559 13.559 13.370

317 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+314.00 13.381 -3.00% -3.00% 13.354 13.543 13.543 13.354


13+315.40 13.365 -3.00% -3.00% 13.338 13.527 13.527 13.338
13+316.80 13.349 -3.00% -3.00% 13.322 13.511 13.511 13.322
13+318.20 13.334 -3.00% -3.00% 13.307 13.496 13.496 13.307
13+319.60 13.318 -3.00% -3.00% 13.291 13.480 13.480 13.291
13+321.00 13.303 -3.00% -3.00% 13.276 13.465 13.465 13.276
13+322.40 13.288 -3.00% -3.00% 13.261 13.450 13.450 13.261
13+323.80 13.273 -3.00% -3.00% 13.246 13.435 13.435 13.246
13+325.20 13.258 -3.00% -3.00% 13.231 13.420 13.420 13.231
13+326.60 13.243 -3.00% -3.00% 13.216 13.405 13.405 13.216
13+328.00 13.229 -3.00% -3.00% 13.202 13.391 13.391 13.202
13+329.40 13.215 -3.00% -3.00% 13.188 13.377 13.377 13.188
13+330.80 13.200 -3.00% -3.00% 13.173 13.362 13.362 13.173
13+332.20 13.186 -3.00% -3.00% 13.159 13.348 13.348 13.159
13+333.60 13.173 -3.00% -3.00% 13.146 13.335 13.335 13.146
13+335.00 13.159 -3.00% -3.00% 13.132 13.321 13.321 13.132
13+336.40 13.145 -3.00% -3.00% 13.118 13.307 13.307 13.118
13+337.80 13.132 -3.00% -3.00% 13.105 13.294 13.294 13.105
13+339.20 13.119 -3.00% -3.00% 13.092 13.281 13.281 13.092
13+340.60 13.106 -3.00% -3.00% 13.079 13.268 13.268 13.079
13+342.00 13.093 -3.00% -3.00% 13.066 13.255 13.255 13.066
13+343.40 13.081 -3.00% -3.00% 13.054 13.243 13.243 13.054
13+344.80 13.068 -3.00% -3.00% 13.041 13.230 13.230 13.041
13+346.20 13.056 -3.00% -3.00% 13.029 13.218 13.218 13.029
13+347.60 13.044 -3.00% -3.00% 13.017 13.206 13.206 13.017
13+349.00 13.032 -3.00% -3.00% 13.005 13.194 13.194 13.005
13+350.40 13.020 -3.00% -3.00% 12.993 13.182 13.182 12.993
13+351.80 13.008 -3.00% -3.00% 12.981 13.170 13.170 12.981
13+353.20 12.997 -3.00% -3.00% 12.970 13.159 13.159 12.970
13+354.60 12.985 -3.00% -3.00% 12.958 13.147 13.147 12.958

318 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+356.00 12.974 -3.00% -3.00% 12.947 13.136 13.136 12.947


13+357.40 12.963 -3.00% -3.00% 12.936 13.125 13.125 12.936
13+358.80 12.952 -3.00% -3.00% 12.925 13.114 13.114 12.925
13+360.20 12.942 -3.00% -3.00% 12.915 13.104 13.104 12.915
13+361.60 12.931 -3.00% -3.00% 12.904 13.093 13.093 12.904
13+363.00 12.921 -3.00% -3.00% 12.894 13.083 13.083 12.894
13+364.40 12.911 -3.00% -3.00% 12.884 13.073 13.073 12.884
13+365.80 12.901 -3.00% -3.00% 12.874 13.063 13.063 12.874
13+367.20 12.891 -3.00% -3.00% 12.864 13.053 13.053 12.864
13+368.60 12.881 -3.00% -3.00% 12.854 13.043 13.043 12.854
13+370.00 12.872 -3.00% -3.00% 12.845 13.034 13.034 12.845
13+371.40 12.862 -3.00% -3.00% 12.835 13.024 13.024 12.835
13+372.80 12.853 -3.00% -3.00% 12.826 13.015 13.015 12.826
13+374.20 12.844 -3.00% -3.00% 12.817 13.006 13.006 12.817
13+375.60 12.835 -3.00% -3.00% 12.808 12.997 12.997 12.808
13+377.00 12.826 -3.00% -3.00% 12.799 12.988 12.988 12.799
13+378.40 12.818 -3.00% -3.00% 12.791 12.980 12.980 12.791
13+379.80 12.810 -3.00% -3.00% 12.783 12.972 12.972 12.783
13+381.20 12.801 -3.00% -3.00% 12.774 12.963 12.963 12.774
13+382.60 12.793 -3.00% -3.00% 12.766 12.955 12.955 12.766
13+384.00 12.785 -3.00% -3.00% 12.758 12.947 12.947 12.758
13+385.40 12.778 -3.00% -3.00% 12.751 12.940 12.940 12.751
13+386.80 12.770 -3.00% -3.00% 12.743 12.932 12.932 12.743
13+388.20 12.763 -3.00% -3.00% 12.736 12.925 12.925 12.736
13+389.60 12.756 -3.00% -3.00% 12.729 12.918 12.918 12.729
13+391.00 12.749 -3.00% -3.00% 12.722 12.911 12.911 12.722
13+392.40 12.742 -3.00% -3.00% 12.715 12.904 12.904 12.715
13+393.80 12.735 -3.00% -3.00% 12.708 12.897 12.897 12.708
13+395.20 12.728 -3.00% -3.00% 12.701 12.890 12.890 12.701
13+396.60 12.722 -3.00% -3.00% 12.695 12.884 12.884 12.695

319 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+398.00 12.716 -3.00% -3.00% 12.689 12.878 12.878 12.689


13+399.40 12.710 -3.00% -3.00% 12.683 12.872 12.872 12.683
13+400.80 12.704 -3.00% -3.00% 12.677 12.866 12.866 12.677
13+402.20 12.698 -3.00% -3.00% 12.671 12.860 12.860 12.671
13+403.60 12.693 -3.00% -3.00% 12.666 12.855 12.855 12.666
13+405.00 12.687 -3.00% -3.00% 12.660 12.849 12.849 12.660
13+406.40 12.682 -3.00% -3.00% 12.655 12.844 12.844 12.655
13+407.80 12.677 -3.00% -3.00% 12.650 12.839 12.839 12.650
13+409.20 12.672 -3.00% -3.00% 12.645 12.834 12.834 12.645
13+410.60 12.667 -3.00% -3.00% 12.640 12.829 12.829 12.640
13+412.00 12.663 -3.00% -3.00% 12.636 12.825 12.825 12.636
13+413.40 12.658 -3.00% -3.00% 12.631 12.820 12.820 12.631
13+414.80 12.654 -3.00% -3.00% 12.627 12.816 12.816 12.627
13+416.20 12.650 -3.00% -3.00% 12.623 12.812 12.812 12.623
13+417.60 12.646 -3.00% -3.00% 12.619 12.808 12.808 12.619
13+419.00 12.642 -3.00% -3.00% 12.615 12.804 12.804 12.615
13+420.40 12.639 -3.00% -3.00% 12.612 12.801 12.801 12.612
13+421.80 12.635 -3.00% -3.00% 12.608 12.797 12.797 12.608
13+423.20 12.632 -3.00% -3.00% 12.605 12.794 12.794 12.605
13+424.60 12.629 -3.00% -3.00% 12.602 12.791 12.791 12.602
13+426.00 12.626 -3.00% -3.00% 12.599 12.788 12.788 12.599
13+427.40 12.623 -3.00% -3.00% 12.596 12.785 12.785 12.596
13+428.80 12.621 -3.00% -3.00% 12.594 12.783 12.783 12.594
13+430.20 12.618 -3.00% -3.00% 12.591 12.780 12.780 12.591
13+431.60 12.616 -3.00% -3.00% 12.589 12.778 12.778 12.589
13+433.00 12.614 -3.00% -3.00% 12.587 12.776 12.776 12.587
13+434.40 12.612 -3.00% -3.00% 12.585 12.774 12.774 12.585
13+435.80 12.610 -3.00% -3.00% 12.583 12.772 12.772 12.583
13+437.20 12.608 -3.00% -3.00% 12.581 12.770 12.770 12.581
13+438.60 12.605 -3.00% -3.00% 12.578 12.767 12.767 12.578

320 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+440.00 12.603 -3.00% -3.00% 12.576 12.765 12.765 12.576


13+441.40 12.601 -3.00% -3.00% 12.574 12.763 12.763 12.574
13+442.80 12.599 -3.00% -3.00% 12.572 12.761 12.761 12.572
13+444.20 12.597 -3.00% -2.94% 12.570 12.759 12.758 12.573
13+445.60 12.595 -3.00% -2.82% 12.568 12.757 12.754 12.577
13+447.00 12.593 -3.00% -2.69% 12.566 12.755 12.751 12.581
13+448.40 12.590 -3.00% -2.57% 12.563 12.752 12.746 12.584
13+449.80 12.588 -3.00% -2.45% 12.561 12.750 12.742 12.588
13+451.20 12.586 -3.00% -2.33% 12.559 12.748 12.739 12.592
13+452.60 12.584 -3.00% -2.21% 12.557 12.746 12.735 12.596
13+454.00 12.582 -3.00% -2.08% 12.555 12.744 12.731 12.600
13+455.40 12.580 -3.00% -1.96% 12.553 12.742 12.727 12.604
13+456.80 12.578 -3.00% -1.84% 12.551 12.740 12.724 12.608
13+458.20 12.575 -3.00% -1.72% 12.548 12.737 12.719 12.611
13+459.60 12.573 -3.00% -1.60% 12.546 12.735 12.715 12.615
13+461.00 12.571 -3.00% -1.47% 12.544 12.733 12.712 12.619
13+462.40 12.569 -3.00% -1.35% 12.542 12.731 12.708 12.623
13+463.80 12.567 -3.00% -1.23% 12.540 12.729 12.704 12.627
13+465.20 12.565 -3.00% -1.11% 12.538 12.727 12.701 12.631
13+466.60 12.563 -3.00% -0.99% 12.536 12.725 12.697 12.635
13+468.00 12.560 -3.00% -0.86% 12.533 12.722 12.692 12.638
13+469.40 12.558 -3.00% -0.74% 12.531 12.720 12.688 12.642
13+470.80 12.556 -3.00% -0.62% 12.529 12.718 12.685 12.646
13+472.20 12.554 -3.00% -0.50% 12.527 12.716 12.681 12.650
13+473.60 12.552 -3.00% -0.38% 12.525 12.714 12.677 12.654
13+475.00 12.550 -3.00% -0.25% 12.523 12.712 12.674 12.658
13+476.40 12.548 -3.00% -0.13% 12.521 12.710 12.670 12.662
13+477.80 12.545 -3.00% -0.01% 12.518 12.707 12.665 12.665
13+479.20 12.543 -3.00% 0.11% 12.516 12.705 12.661 12.668
13+480.60 12.541 -3.00% 0.23% 12.514 12.703 12.658 12.672

321 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+482.00 12.539 -3.00% 0.36% 12.512 12.701 12.654 12.676


13+483.40 12.537 -3.00% 0.48% 12.510 12.699 12.650 12.680
13+484.80 12.535 -3.00% 0.60% 12.508 12.697 12.647 12.684
13+486.20 12.533 -3.00% 0.72% 12.506 12.695 12.643 12.688
13+487.60 12.530 -3.00% 0.84% 12.503 12.692 12.638 12.691
13+489.00 12.528 -3.00% 0.97% 12.501 12.690 12.634 12.695
13+490.40 12.526 -3.00% 1.09% 12.499 12.688 12.631 12.699
13+491.80 12.524 -3.00% 1.21% 12.497 12.686 12.627 12.703
13+493.20 12.522 -3.00% 1.33% 12.495 12.684 12.623 12.707
13+494.60 12.520 -3.00% 1.45% 12.493 12.682 12.620 12.711
13+496.00 12.517 -3.00% 1.58% 12.490 12.679 12.615 12.714
13+497.40 12.515 -3.00% 1.70% 12.488 12.677 12.611 12.718
13+498.80 12.513 -3.00% 1.82% 12.486 12.675 12.608 12.722
13+500.20 12.511 -3.00% 1.94% 12.484 12.673 12.604 12.726
13+501.60 12.509 -3.00% 2.06% 12.482 12.671 12.600 12.730
13+503.00 12.507 -3.00% 2.19% 12.480 12.669 12.596 12.734
13+504.40 12.505 -3.00% 2.31% 12.478 12.667 12.593 12.738
13+505.80 12.502 -3.00% 2.43% 12.475 12.664 12.588 12.741
13+507.20 12.500 -3.00% 2.55% 12.473 12.662 12.584 12.745
13+508.60 12.498 -3.00% 2.67% 12.471 12.660 12.581 12.749
13+510.00 12.496 -3.00% 2.80% 12.469 12.658 12.577 12.753
13+511.40 12.494 -3.00% 2.92% 12.467 12.656 12.573 12.757
13+512.80 12.492 -3.04% 3.04% 12.463 12.655 12.569 12.761
13+514.20 12.490 -3.16% 3.16% 12.455 12.654 12.566 12.765
13+515.60 12.487 -3.28% 3.28% 12.446 12.653 12.561 12.768
13+517.00 12.485 -3.40% 3.40% 12.438 12.653 12.557 12.772
13+518.40 12.483 -3.40% 3.40% 12.436 12.651 12.555 12.770
13+519.80 12.481 -3.40% 3.40% 12.434 12.649 12.553 12.768
13+521.20 12.479 -3.40% 3.40% 12.432 12.647 12.551 12.766
13+522.60 12.477 -3.40% 3.40% 12.430 12.645 12.549 12.764

322 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+524.00 12.475 -3.40% 3.40% 12.428 12.643 12.547 12.762


13+525.40 12.472 -3.40% 3.40% 12.425 12.640 12.544 12.759
13+526.80 12.470 -3.40% 3.40% 12.423 12.638 12.542 12.757
13+528.20 12.468 -3.40% 3.40% 12.421 12.636 12.540 12.755
13+529.60 12.466 -3.40% 3.40% 12.419 12.634 12.538 12.753
13+531.00 12.464 -3.40% 3.40% 12.417 12.632 12.536 12.751
13+532.40 12.462 -3.40% 3.40% 12.415 12.630 12.534 12.749
13+533.80 12.460 -3.40% 3.40% 12.413 12.628 12.532 12.747
13+535.20 12.457 -3.40% 3.40% 12.410 12.625 12.529 12.744
13+536.60 12.455 -3.40% 3.40% 12.408 12.623 12.527 12.742
13+538.00 12.453 -3.40% 3.40% 12.406 12.621 12.525 12.740
13+539.40 12.451 -3.40% 3.40% 12.404 12.619 12.523 12.738
13+540.80 12.449 -3.40% 3.40% 12.402 12.617 12.521 12.736
13+542.20 12.447 -3.40% 3.40% 12.400 12.615 12.519 12.734
13+543.60 12.445 -3.40% 3.40% 12.398 12.613 12.517 12.732
13+545.00 12.442 -3.40% 3.40% 12.395 12.610 12.514 12.729
13+546.40 12.440 -3.40% 3.40% 12.393 12.608 12.512 12.727
13+547.80 12.438 -3.40% 3.40% 12.391 12.606 12.510 12.725
13+549.20 12.436 -3.40% 3.40% 12.389 12.604 12.508 12.723
13+550.60 12.434 -3.40% 3.40% 12.387 12.602 12.506 12.721
13+552.00 12.432 -3.40% 3.40% 12.385 12.600 12.504 12.719
13+553.40 12.430 -3.40% 3.40% 12.383 12.598 12.502 12.717
13+554.80 12.427 -3.40% 3.40% 12.380 12.595 12.499 12.714
13+556.20 12.425 -3.40% 3.40% 12.378 12.593 12.497 12.712
13+557.60 12.423 -3.40% 3.40% 12.376 12.591 12.495 12.710
13+559.00 12.421 -3.40% 3.40% 12.374 12.589 12.493 12.708
13+560.40 12.419 -3.40% 3.40% 12.372 12.587 12.491 12.706
13+561.80 12.417 -3.40% 3.40% 12.370 12.585 12.489 12.704
13+563.20 12.415 -3.40% 3.40% 12.368 12.583 12.487 12.702
13+564.60 12.412 -3.40% 3.40% 12.365 12.580 12.484 12.699

323 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+566.00 12.410 -3.40% 3.40% 12.363 12.578 12.482 12.697


13+567.40 12.408 -3.40% 3.40% 12.361 12.576 12.480 12.695
13+568.80 12.406 -3.40% 3.40% 12.359 12.574 12.478 12.693
13+570.20 12.404 -3.40% 3.40% 12.357 12.572 12.476 12.691
13+571.60 12.402 -3.40% 3.40% 12.355 12.570 12.474 12.689
13+573.00 12.399 -3.40% 3.40% 12.352 12.567 12.471 12.686
13+574.40 12.397 -3.40% 3.40% 12.350 12.565 12.469 12.684
13+575.80 12.395 -3.40% 3.40% 12.348 12.563 12.467 12.682
13+577.20 12.393 -3.40% 3.40% 12.346 12.561 12.465 12.680
13+578.60 12.391 -3.40% 3.40% 12.344 12.559 12.463 12.678
13+580.00 12.389 -3.40% 3.40% 12.342 12.557 12.461 12.676
13+581.40 12.387 -3.40% 3.40% 12.340 12.555 12.459 12.674
13+582.80 12.384 -3.40% 3.40% 12.337 12.552 12.456 12.671
13+584.20 12.382 -3.40% 3.40% 12.335 12.550 12.454 12.669
13+585.60 12.380 -3.40% 3.40% 12.333 12.548 12.452 12.667
13+587.00 12.378 -3.40% 3.40% 12.331 12.546 12.450 12.665
13+588.40 12.376 -3.40% 3.40% 12.329 12.544 12.448 12.663
13+589.80 12.374 -3.40% 3.40% 12.327 12.542 12.446 12.661
13+591.20 12.372 -3.40% 3.40% 12.325 12.540 12.444 12.659
13+592.60 12.369 -3.40% 3.40% 12.322 12.537 12.441 12.656
13+594.00 12.366 -3.40% 3.40% 12.319 12.534 12.438 12.653
13+595.40 12.362 -3.40% 3.40% 12.315 12.530 12.434 12.649
13+596.80 12.359 -3.40% 3.40% 12.312 12.527 12.431 12.646
13+598.20 12.356 -3.40% 3.40% 12.309 12.524 12.428 12.643
13+599.60 12.352 -3.40% 3.40% 12.305 12.520 12.424 12.639
13+601.00 12.349 -3.40% 3.40% 12.302 12.517 12.421 12.636
13+602.40 12.346 -3.40% 3.40% 12.299 12.514 12.418 12.633
13+603.80 12.342 -3.40% 3.40% 12.295 12.510 12.414 12.629
13+605.20 12.339 -3.40% 3.40% 12.292 12.507 12.411 12.626
13+606.60 12.336 -3.40% 3.40% 12.289 12.504 12.408 12.623

324 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+608.00 12.332 -3.40% 3.40% 12.285 12.500 12.404 12.619


13+609.40 12.329 -3.40% 3.40% 12.282 12.497 12.401 12.616
13+610.80 12.326 -3.40% 3.40% 12.279 12.494 12.398 12.613
13+612.20 12.322 -3.40% 3.40% 12.275 12.490 12.394 12.609
13+613.60 12.319 -3.40% 3.40% 12.272 12.487 12.391 12.606
13+615.00 12.316 -3.40% 3.40% 12.269 12.484 12.388 12.603
13+616.40 12.312 -3.40% 3.40% 12.265 12.480 12.384 12.599
13+617.80 12.309 -3.40% 3.40% 12.262 12.477 12.381 12.596
13+619.20 12.306 -3.40% 3.40% 12.259 12.474 12.378 12.593
13+620.60 12.302 -3.40% 3.40% 12.255 12.470 12.374 12.589
13+622.00 12.299 -3.40% 3.40% 12.252 12.467 12.371 12.586
13+623.40 12.296 -3.40% 3.40% 12.249 12.464 12.368 12.583
13+624.80 12.292 -3.40% 3.40% 12.245 12.460 12.364 12.579
13+626.20 12.289 -3.40% 3.40% 12.242 12.457 12.361 12.576
13+627.60 12.285 -3.40% 3.40% 12.238 12.453 12.357 12.572
13+629.00 12.282 -3.40% 3.40% 12.235 12.450 12.354 12.569
13+630.40 12.279 -3.40% 3.40% 12.232 12.447 12.351 12.566
13+631.80 12.275 -3.40% 3.40% 12.228 12.443 12.347 12.562
13+633.20 12.272 -3.40% 3.40% 12.225 12.440 12.344 12.559
13+634.60 12.269 -3.40% 3.40% 12.222 12.437 12.341 12.556
13+636.00 12.265 -3.40% 3.40% 12.218 12.433 12.337 12.552
13+637.40 12.262 -3.40% 3.40% 12.215 12.430 12.334 12.549
13+638.80 12.259 -3.40% 3.40% 12.212 12.427 12.331 12.546
13+640.20 12.255 -3.40% 3.40% 12.208 12.423 12.327 12.542
13+641.60 12.252 -3.40% 3.40% 12.205 12.420 12.324 12.539
13+643.00 12.249 -3.40% 3.40% 12.202 12.417 12.321 12.536
13+644.40 12.245 -3.40% 3.40% 12.198 12.413 12.317 12.532
13+645.80 12.242 -3.40% 3.40% 12.195 12.410 12.314 12.529
13+647.20 12.239 -3.40% 3.40% 12.192 12.407 12.311 12.526
13+648.60 12.235 -3.40% 3.40% 12.188 12.403 12.307 12.522

325 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+650.00 12.232 -3.40% 3.40% 12.185 12.400 12.304 12.519


13+651.40 12.229 -3.40% 3.40% 12.182 12.397 12.301 12.516
13+652.80 12.225 -3.40% 3.40% 12.178 12.393 12.297 12.512
13+654.20 12.222 -3.40% 3.40% 12.175 12.390 12.294 12.509
13+655.60 12.219 -3.40% 3.40% 12.172 12.387 12.291 12.506
13+657.00 12.215 -3.40% 3.40% 12.168 12.383 12.287 12.502
13+658.40 12.212 -3.40% 3.40% 12.165 12.380 12.284 12.499
13+659.80 12.209 -3.40% 3.40% 12.162 12.377 12.281 12.496
13+661.20 12.205 -3.40% 3.40% 12.158 12.373 12.277 12.492
13+662.60 12.202 -3.40% 3.40% 12.155 12.370 12.274 12.489
13+664.00 12.198 -3.40% 3.40% 12.151 12.366 12.270 12.485
13+665.40 12.195 -3.40% 3.40% 12.148 12.363 12.267 12.482
13+666.80 12.192 -3.40% 3.40% 12.145 12.360 12.264 12.479
13+668.20 12.188 -3.40% 3.40% 12.141 12.356 12.260 12.475
13+669.60 12.185 -3.40% 3.40% 12.138 12.353 12.257 12.472
13+671.00 12.182 -3.40% 3.40% 12.135 12.350 12.254 12.469
13+672.40 12.178 -3.40% 3.40% 12.131 12.346 12.250 12.465
13+673.80 12.175 -3.40% 3.40% 12.128 12.343 12.247 12.462
13+675.20 12.172 -3.40% 3.40% 12.125 12.340 12.244 12.459
13+676.60 12.168 -3.40% 3.40% 12.121 12.336 12.240 12.455
13+678.00 12.165 -3.40% 3.40% 12.118 12.333 12.237 12.452
13+679.40 12.162 -3.40% 3.40% 12.115 12.330 12.234 12.449
13+680.80 12.158 -3.40% 3.40% 12.111 12.326 12.230 12.445
13+682.20 12.155 -3.40% 3.40% 12.108 12.323 12.227 12.442
13+683.60 12.152 -3.40% 3.40% 12.105 12.320 12.224 12.439
13+685.00 12.148 -3.40% 3.40% 12.101 12.316 12.220 12.435
13+686.40 12.145 -3.40% 3.40% 12.098 12.313 12.217 12.432
13+687.80 12.142 -3.40% 3.40% 12.095 12.310 12.214 12.429
13+689.20 12.138 -3.40% 3.40% 12.091 12.306 12.210 12.425
13+690.60 12.135 -3.40% 3.40% 12.088 12.303 12.207 12.422

326 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+692.00 12.132 -3.40% 3.40% 12.085 12.300 12.204 12.419


13+693.40 12.128 -3.40% 3.40% 12.081 12.296 12.200 12.415
13+694.80 12.125 -3.40% 3.40% 12.078 12.293 12.197 12.412
13+696.20 12.122 -3.40% 3.40% 12.075 12.290 12.194 12.409
13+697.60 12.118 -3.40% 3.40% 12.071 12.286 12.190 12.405
13+699.00 12.115 -3.40% 3.40% 12.068 12.283 12.187 12.402
13+700.40 12.112 -3.40% 3.40% 12.065 12.280 12.184 12.399
13+701.80 12.108 -3.40% 3.40% 12.061 12.276 12.180 12.395
13+703.20 12.105 -3.40% 3.40% 12.058 12.273 12.177 12.392
13+704.60 12.101 -3.40% 3.40% 12.054 12.269 12.173 12.388
13+706.00 12.098 -3.40% 3.40% 12.051 12.266 12.170 12.385
13+707.40 12.095 -3.40% 3.40% 12.048 12.263 12.167 12.382
13+708.80 12.091 -3.40% 3.40% 12.044 12.259 12.163 12.378
13+710.20 12.088 -3.40% 3.40% 12.041 12.256 12.160 12.375
13+711.60 12.085 -3.40% 3.40% 12.038 12.253 12.157 12.372
13+713.00 12.081 -3.40% 3.40% 12.034 12.249 12.153 12.368
13+714.40 12.078 -3.40% 3.40% 12.031 12.246 12.150 12.365
13+715.80 12.075 -3.40% 3.40% 12.028 12.243 12.147 12.362
13+717.20 12.071 -3.40% 3.40% 12.024 12.239 12.143 12.358
13+718.60 12.068 -3.40% 3.40% 12.021 12.236 12.140 12.355
13+720.00 12.065 -3.40% 3.40% 12.018 12.233 12.137 12.352
13+721.40 12.061 -3.40% 3.40% 12.014 12.229 12.133 12.348
13+722.80 12.058 -3.40% 3.40% 12.011 12.226 12.130 12.345
13+724.20 12.055 -3.40% 3.40% 12.008 12.223 12.127 12.342
13+725.60 12.051 -3.40% 3.40% 12.004 12.219 12.123 12.338
13+727.00 12.048 -3.40% 3.40% 12.001 12.216 12.120 12.335
13+728.40 12.045 -3.40% 3.40% 11.998 12.213 12.117 12.332
13+729.80 12.041 -3.40% 3.40% 11.994 12.209 12.113 12.328
13+731.20 12.038 -3.40% 3.40% 11.991 12.206 12.110 12.325
13+732.60 12.035 -3.40% 3.40% 11.988 12.203 12.107 12.322

327 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+734.00 12.031 -3.40% 3.40% 11.984 12.199 12.103 12.318


13+735.40 12.028 -3.40% 3.40% 11.981 12.196 12.100 12.315
13+736.80 12.025 -3.40% 3.40% 11.978 12.193 12.097 12.312
13+738.20 12.021 -3.40% 3.40% 11.974 12.189 12.093 12.308
13+739.60 12.018 -3.40% 3.40% 11.971 12.186 12.090 12.305
13+741.00 12.014 -3.40% 3.40% 11.967 12.182 12.086 12.301
13+742.40 12.011 -3.40% 3.40% 11.964 12.179 12.083 12.298
13+743.80 12.008 -3.40% 3.40% 11.961 12.176 12.080 12.295
13+745.20 12.004 -3.40% 3.40% 11.957 12.172 12.076 12.291
13+746.60 12.001 -3.40% 3.40% 11.954 12.169 12.073 12.288
13+748.00 11.998 -3.40% 3.40% 11.951 12.166 12.070 12.285
13+749.40 11.994 -3.40% 3.40% 11.947 12.162 12.066 12.281
13+750.80 11.991 -3.40% 3.40% 11.944 12.159 12.063 12.278
13+752.20 11.988 -3.40% 3.40% 11.941 12.156 12.060 12.275
13+753.60 11.984 -3.40% 3.40% 11.937 12.152 12.056 12.271
13+755.00 11.981 -3.40% 3.40% 11.934 12.149 12.053 12.268
13+756.40 11.978 -3.40% 3.40% 11.931 12.146 12.050 12.265
13+757.80 11.974 -3.40% 3.40% 11.927 12.142 12.046 12.261
13+759.20 11.971 -3.40% 3.40% 11.924 12.139 12.043 12.258
13+760.60 11.968 -3.40% 3.40% 11.921 12.136 12.040 12.255
13+762.00 11.964 -3.40% 3.40% 11.917 12.132 12.036 12.251
13+763.40 11.961 -3.40% 3.40% 11.914 12.129 12.033 12.248
13+764.80 11.958 -3.40% 3.40% 11.911 12.126 12.030 12.245
13+766.20 11.954 -3.40% 3.40% 11.907 12.122 12.026 12.241
13+767.60 11.951 -3.40% 3.40% 11.904 12.119 12.023 12.238
13+769.00 11.948 -3.40% 3.40% 11.901 12.116 12.020 12.235
13+770.40 11.946 -3.40% 3.40% 11.899 12.114 12.018 12.233
13+771.80 11.944 -3.40% 3.40% 11.897 12.112 12.016 12.231
13+773.20 11.943 -3.40% 3.40% 11.896 12.111 12.015 12.230
13+774.60 11.942 -3.40% 3.40% 11.895 12.110 12.014 12.229

328 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+776.00 11.941 -3.40% 3.40% 11.894 12.109 12.013 12.228


13+777.40 11.941 -3.40% 3.40% 11.894 12.109 12.013 12.228
13+778.80 11.941 -3.40% 3.40% 11.894 12.109 12.013 12.228
13+780.20 11.942 -3.40% 3.40% 11.895 12.110 12.014 12.229
13+781.60 11.943 -3.40% 3.40% 11.896 12.111 12.015 12.230
13+783.00 11.944 -3.40% 3.40% 11.897 12.112 12.016 12.231
13+784.40 11.946 -3.40% 3.40% 11.899 12.114 12.018 12.233
13+785.80 11.949 -3.40% 3.40% 11.902 12.117 12.021 12.236
13+787.20 11.952 -3.40% 3.40% 11.905 12.120 12.024 12.239
13+788.60 11.955 -3.40% 3.40% 11.908 12.123 12.027 12.242
13+790.00 11.959 -3.40% 3.40% 11.912 12.127 12.031 12.246
13+791.40 11.963 -3.40% 3.40% 11.916 12.131 12.035 12.250
13+792.80 11.967 -3.40% 3.40% 11.920 12.135 12.039 12.254
13+794.20 11.972 -3.40% 3.40% 11.925 12.140 12.044 12.259
13+795.60 11.978 -3.40% 3.40% 11.931 12.146 12.050 12.265
13+797.00 11.984 -3.40% 3.40% 11.937 12.152 12.056 12.271
13+798.40 11.990 -3.40% 3.40% 11.943 12.158 12.062 12.277
13+799.80 11.997 -3.40% 3.40% 11.950 12.165 12.069 12.284
13+801.20 12.004 -3.40% 3.40% 11.957 12.172 12.076 12.291
13+802.60 12.012 -3.40% 3.40% 11.965 12.180 12.084 12.299
13+804.00 12.020 -3.40% 3.40% 11.973 12.188 12.092 12.307
13+805.40 12.028 -3.40% 3.40% 11.981 12.196 12.100 12.315
13+806.80 12.037 -3.40% 3.40% 11.990 12.205 12.109 12.324
13+808.20 12.046 -3.40% 3.40% 11.999 12.214 12.118 12.333
13+809.60 12.056 -3.40% 3.40% 12.009 12.224 12.128 12.343
13+811.00 12.066 -3.40% 3.40% 12.019 12.234 12.138 12.353
13+812.40 12.077 -3.40% 3.40% 12.030 12.245 12.149 12.364
13+813.80 12.088 -3.40% 3.40% 12.041 12.256 12.160 12.375
13+815.20 12.099 -3.40% 3.40% 12.052 12.267 12.171 12.386
13+816.60 12.111 -3.40% 3.40% 12.064 12.279 12.183 12.398

329 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+818.00 12.124 -3.40% 3.40% 12.077 12.292 12.196 12.411


13+819.40 12.136 -3.40% 3.40% 12.089 12.304 12.208 12.423
13+820.80 12.150 -3.40% 3.40% 12.103 12.318 12.222 12.437
13+822.20 12.163 -3.40% 3.40% 12.116 12.331 12.235 12.450
13+823.60 12.177 -3.40% 3.40% 12.130 12.345 12.249 12.464
13+825.00 12.192 -3.40% 3.40% 12.145 12.360 12.264 12.479
13+826.40 12.207 -3.40% 3.40% 12.160 12.375 12.279 12.494
13+827.80 12.222 -3.40% 3.40% 12.175 12.390 12.294 12.509
13+829.20 12.238 -3.40% 3.40% 12.191 12.406 12.310 12.525
13+830.60 12.254 -3.40% 3.40% 12.207 12.422 12.326 12.541
13+832.00 12.271 -3.40% 3.40% 12.224 12.439 12.343 12.558
13+833.40 12.288 -3.40% 3.40% 12.241 12.456 12.360 12.575
13+834.80 12.305 -3.40% 3.40% 12.258 12.473 12.377 12.592
13+836.20 12.323 -3.40% 3.40% 12.276 12.491 12.395 12.610
13+837.60 12.342 -3.40% 3.40% 12.295 12.510 12.414 12.629
13+839.00 12.361 -3.40% 3.40% 12.314 12.529 12.433 12.648
13+840.40 12.380 -3.40% 3.40% 12.333 12.548 12.452 12.667
13+841.80 12.400 -3.40% 3.40% 12.353 12.568 12.472 12.687
13+843.20 12.420 -3.40% 3.40% 12.373 12.588 12.492 12.707
13+844.60 12.440 -3.40% 3.40% 12.393 12.608 12.512 12.727
13+846.00 12.461 -3.40% 3.40% 12.414 12.629 12.533 12.748
13+847.40 12.483 -3.40% 3.40% 12.436 12.651 12.555 12.770
13+848.80 12.504 -3.40% 3.40% 12.457 12.672 12.576 12.791
13+850.20 12.527 -3.40% 3.40% 12.480 12.695 12.599 12.814
13+851.60 12.549 -3.40% 3.40% 12.502 12.717 12.621 12.836
13+853.00 12.573 -3.40% 3.40% 12.526 12.741 12.645 12.860
13+854.40 12.596 -3.40% 3.40% 12.549 12.764 12.668 12.883
13+855.80 12.620 -3.40% 3.40% 12.573 12.788 12.692 12.907
13+857.20 12.645 -3.40% 3.40% 12.598 12.813 12.717 12.932
13+858.60 12.669 -3.40% 3.40% 12.622 12.837 12.741 12.956

330 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+860.00 12.695 -3.40% 3.40% 12.648 12.863 12.767 12.982


13+861.40 12.720 -3.40% 3.40% 12.673 12.888 12.792 13.007
13+862.80 12.747 -3.40% 3.40% 12.700 12.915 12.819 13.034
13+864.20 12.773 -3.40% 3.40% 12.726 12.941 12.845 13.060
13+865.60 12.800 -3.40% 3.40% 12.753 12.968 12.872 13.087
13+867.00 12.828 -3.40% 3.40% 12.781 12.996 12.900 13.115
13+868.40 12.856 -3.40% 3.40% 12.809 13.024 12.928 13.143
13+869.80 12.884 -3.40% 3.40% 12.837 13.052 12.956 13.171
13+871.20 12.913 -3.40% 3.40% 12.866 13.081 12.985 13.200
13+872.60 12.942 -3.40% 3.40% 12.895 13.110 13.014 13.229
13+874.00 12.971 -3.40% 3.40% 12.924 13.139 13.043 13.258
13+875.40 13.002 -3.40% 3.40% 12.955 13.170 13.074 13.289
13+876.80 13.032 -3.40% 3.40% 12.985 13.200 13.104 13.319
13+878.20 13.063 -3.40% 3.40% 13.016 13.231 13.135 13.350
13+879.60 13.094 -3.40% 3.40% 13.047 13.262 13.166 13.381
13+881.00 13.126 -3.40% 3.40% 13.079 13.294 13.198 13.413
13+882.40 13.158 -3.40% 3.40% 13.111 13.326 13.230 13.445
13+883.80 13.191 -3.40% 3.40% 13.144 13.359 13.263 13.478
13+885.20 13.224 -3.40% 3.40% 13.177 13.392 13.296 13.511
13+886.60 13.257 -3.40% 3.40% 13.210 13.425 13.329 13.544
13+888.00 13.291 -3.40% 3.40% 13.244 13.459 13.363 13.578
13+889.40 13.326 -3.40% 3.40% 13.279 13.494 13.398 13.613
13+890.80 13.361 -3.40% 3.40% 13.314 13.529 13.433 13.648
13+892.20 13.396 -3.40% 3.40% 13.349 13.564 13.468 13.683
13+893.60 13.431 -3.40% 3.40% 13.384 13.599 13.503 13.718
13+895.00 13.468 -3.40% 3.40% 13.421 13.636 13.540 13.755
13+896.40 13.504 -3.40% 3.40% 13.457 13.672 13.576 13.791
13+897.80 13.541 -3.40% 3.40% 13.494 13.709 13.613 13.828
13+899.20 13.578 -3.40% 3.40% 13.531 13.746 13.650 13.865
13+900.60 13.616 -3.40% 3.40% 13.569 13.784 13.688 13.903

331 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+902.00 13.654 -3.40% 3.40% 13.607 13.822 13.726 13.941


13+903.40 13.693 -3.40% 3.40% 13.646 13.861 13.765 13.980
13+904.80 13.732 -3.40% 3.40% 13.685 13.900 13.804 14.019
13+906.20 13.772 -3.40% 3.40% 13.725 13.940 13.844 14.059
13+907.60 13.812 -3.40% 3.40% 13.765 13.980 13.884 14.099
13+909.00 13.852 -3.40% 3.40% 13.805 14.020 13.924 14.139
13+910.40 13.893 -3.40% 3.40% 13.846 14.061 13.965 14.180
13+911.80 13.934 -3.40% 3.40% 13.887 14.102 14.006 14.221
13+913.20 13.976 -3.40% 3.40% 13.929 14.144 14.048 14.263
13+914.60 14.017 -3.40% 3.40% 13.970 14.185 14.089 14.304
13+916.00 14.059 -3.40% 3.40% 14.012 14.227 14.131 14.346
13+917.40 14.100 -3.40% 3.40% 14.053 14.268 14.172 14.387
13+918.80 14.142 -3.40% 3.40% 14.095 14.310 14.214 14.429
13+920.20 14.183 -3.40% 3.40% 14.136 14.351 14.255 14.470
13+921.60 14.225 -3.40% 3.40% 14.178 14.393 14.297 14.512
13+923.00 14.266 -3.40% 3.40% 14.219 14.434 14.338 14.553
13+924.40 14.308 -3.40% 3.40% 14.261 14.476 14.380 14.595
13+925.80 14.349 -3.40% 3.40% 14.302 14.517 14.421 14.636
13+927.20 14.391 -3.40% 3.40% 14.344 14.559 14.463 14.678
13+928.60 14.432 -3.40% 3.40% 14.385 14.600 14.504 14.719
13+930.00 14.474 -3.40% 3.40% 14.427 14.642 14.546 14.761
13+931.40 14.515 -3.30% 3.30% 14.473 14.681 14.589 14.797
13+932.80 14.557 -3.18% 3.18% 14.521 14.721 14.633 14.833
13+934.20 14.598 -3.05% 3.05% 14.568 14.761 14.675 14.868
13+935.60 14.640 -3.00% 2.93% 14.613 14.802 14.719 14.904
13+937.00 14.681 -3.00% 2.81% 14.654 14.843 14.762 14.939
13+938.40 14.723 -3.00% 2.69% 14.696 14.885 14.805 14.975
13+939.80 14.764 -3.00% 2.57% 14.737 14.926 14.848 15.010
13+941.20 14.806 -3.00% 2.44% 14.779 14.968 14.892 15.046
13+942.60 14.847 -3.00% 2.32% 14.820 15.009 14.934 15.081

332 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+944.00 14.889 -3.00% 2.20% 14.862 15.051 14.978 15.117


13+945.40 14.929 -3.00% 2.08% 14.902 15.091 15.020 15.151
13+946.80 14.969 -3.00% 1.96% 14.942 15.131 15.062 15.185
13+948.20 15.007 -3.00% 1.83% 14.980 15.169 15.101 15.217
13+949.60 15.045 -3.00% 1.71% 15.018 15.207 15.141 15.249
13+951.00 15.081 -3.00% 1.59% 15.054 15.243 15.179 15.279
13+952.40 15.116 -3.00% 1.47% 15.089 15.278 15.215 15.308
13+953.80 15.150 -3.00% 1.35% 15.123 15.312 15.251 15.336
13+955.20 15.182 -3.00% 1.22% 15.155 15.344 15.285 15.362
13+956.60 15.214 -3.00% 1.10% 15.187 15.376 15.319 15.388
13+958.00 15.244 -3.00% 0.98% 15.217 15.406 15.350 15.412
13+959.40 15.273 -3.00% 0.86% 15.246 15.435 15.381 15.435
13+960.80 15.301 -3.00% 0.74% 15.274 15.463 15.411 15.457
13+962.20 15.328 -3.00% 0.61% 15.301 15.490 15.439 15.478
13+963.60 15.354 -3.00% 0.49% 15.327 15.516 15.467 15.498
13+965.00 15.379 -3.00% 0.37% 15.352 15.541 15.494 15.517
13+966.40 15.402 -3.00% 0.25% 15.375 15.564 15.519 15.534
13+967.80 15.424 -3.00% 0.13% 15.397 15.586 15.542 15.550
13+969.20 15.446 -3.00% 0.00% 15.419 15.608 15.566 15.566
13+970.60 15.466 -3.00% -0.12% 15.439 15.628 15.588 15.580
13+972.00 15.484 -3.00% -0.24% 15.457 15.646 15.607 15.592
13+973.40 15.502 -3.00% -0.36% 15.475 15.664 15.627 15.604
13+974.80 15.519 -3.00% -0.48% 15.492 15.681 15.646 15.615
13+976.20 15.534 -3.00% -0.61% 15.507 15.696 15.662 15.624
13+977.60 15.548 -3.00% -0.73% 15.521 15.710 15.678 15.632
13+979.00 15.561 -3.00% -0.85% 15.534 15.723 15.693 15.639
13+980.40 15.573 -3.00% -0.97% 15.546 15.735 15.707 15.645
13+981.80 15.584 -3.00% -1.09% 15.557 15.746 15.719 15.650
13+983.20 15.594 -3.00% -1.22% 15.567 15.756 15.731 15.654
13+984.60 15.602 -3.00% -1.34% 15.575 15.764 15.741 15.656

333 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

13+986.00 15.609 -3.00% -1.46% 15.582 15.771 15.749 15.657


13+987.40 15.615 -3.00% -1.58% 15.588 15.777 15.757 15.657
13+988.80 15.620 -3.00% -1.70% 15.593 15.782 15.764 15.656
13+990.20 15.624 -3.00% -1.83% 15.597 15.786 15.770 15.654
13+991.60 15.627 -3.00% -1.95% 15.600 15.789 15.774 15.652
13+993.00 15.629 -3.00% -2.07% 15.602 15.791 15.778 15.648
13+994.40 15.629 -3.00% -2.19% 15.602 15.791 15.780 15.642
13+995.80 15.628 -3.00% -2.31% 15.601 15.790 15.780 15.635
13+997.20 15.626 -3.00% -2.44% 15.599 15.788 15.780 15.627
13+998.60 15.623 -3.00% -2.56% 15.596 15.785 15.779 15.618
14+000.00 15.619 -3.00% -2.68% 15.592 15.781 15.777 15.608
14+001.40 15.614 -3.00% -2.80% 15.587 15.776 15.773 15.597
14+002.80 15.607 -3.00% -2.93% 15.580 15.769 15.768 15.584
14+004.20 15.599 -3.00% -3.00% 15.572 15.761 15.761 15.572
14+005.60 15.590 -3.00% -3.00% 15.563 15.752 15.752 15.563
14+007.00 15.581 -3.00% -3.00% 15.554 15.743 15.743 15.554
14+008.40 15.569 -3.00% -3.00% 15.542 15.731 15.731 15.542
14+009.80 15.557 -3.00% -3.00% 15.530 15.719 15.719 15.530
14+011.20 15.544 -3.00% -3.00% 15.517 15.706 15.706 15.517
14+012.60 15.529 -3.00% -3.00% 15.502 15.691 15.691 15.502
14+014.00 15.513 -3.00% -3.00% 15.486 15.675 15.675 15.486
14+015.40 15.496 -3.00% -3.00% 15.469 15.658 15.658 15.469
14+016.80 15.478 -3.00% -3.00% 15.451 15.640 15.640 15.451
14+018.20 15.459 -3.00% -3.00% 15.432 15.621 15.621 15.432
14+019.60 15.439 -3.00% -3.00% 15.412 15.601 15.601 15.412
14+021.00 15.417 -3.00% -3.00% 15.390 15.579 15.579 15.390
14+022.40 15.395 -3.00% -3.00% 15.368 15.557 15.557 15.368
14+023.80 15.371 -3.00% -3.00% 15.344 15.533 15.533 15.344
14+025.20 15.346 -3.00% -3.00% 15.319 15.508 15.508 15.319
14+026.60 15.320 -3.00% -3.00% 15.293 15.482 15.482 15.293

334 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+028.00 15.292 -3.00% -3.00% 15.265 15.454 15.454 15.265


14+029.40 15.264 -3.00% -3.00% 15.237 15.426 15.426 15.237
14+030.80 15.234 -3.00% -3.00% 15.207 15.396 15.396 15.207
14+032.20 15.204 -3.00% -3.00% 15.177 15.366 15.366 15.177
14+033.60 15.172 -3.00% -3.00% 15.145 15.334 15.334 15.145
14+035.00 15.139 -3.00% -3.00% 15.112 15.301 15.301 15.112
14+036.40 15.104 -3.00% -3.00% 15.077 15.266 15.266 15.077
14+037.80 15.069 -3.00% -3.00% 15.042 15.231 15.231 15.042
14+039.20 15.033 -3.00% -3.00% 15.006 15.195 15.195 15.006
14+040.60 14.995 -3.00% -3.00% 14.968 15.157 15.157 14.968
14+042.00 14.956 -3.00% -3.00% 14.929 15.118 15.118 14.929
14+043.40 14.916 -3.00% -3.00% 14.889 15.078 15.078 14.889
14+044.80 14.875 -3.00% -3.00% 14.848 15.037 15.037 14.848
14+046.20 14.833 -3.00% -3.00% 14.806 14.995 14.995 14.806
14+047.60 14.789 -3.00% -3.00% 14.762 14.951 14.951 14.762
14+049.00 14.745 -3.00% -3.00% 14.718 14.907 14.907 14.718
14+050.40 14.700 -3.00% -3.00% 14.673 14.862 14.862 14.673
14+051.80 14.655 -3.00% -3.00% 14.628 14.817 14.817 14.628
14+053.20 14.610 -3.00% -3.00% 14.583 14.772 14.772 14.583
14+054.60 14.565 -3.00% -3.00% 14.538 14.727 14.727 14.538
14+056.00 14.520 -3.00% -3.00% 14.493 14.682 14.682 14.493
14+057.40 14.476 -3.00% -3.00% 14.449 14.638 14.638 14.449
14+058.80 14.431 -3.00% -3.00% 14.404 14.593 14.593 14.404
14+060.20 14.386 -3.00% -3.00% 14.359 14.548 14.548 14.359
14+061.60 14.341 -3.00% -3.00% 14.314 14.503 14.503 14.314
14+063.00 14.296 -3.00% -3.00% 14.269 14.458 14.458 14.269
14+064.40 14.251 -3.00% -3.00% 14.224 14.413 14.413 14.224
14+065.80 14.206 -3.00% -3.00% 14.179 14.368 14.368 14.179
14+067.20 14.161 -3.00% -3.00% 14.134 14.323 14.323 14.134
14+068.60 14.117 -3.00% -3.00% 14.090 14.279 14.279 14.090

335 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+070.00 14.072 -3.00% -3.00% 14.045 14.234 14.234 14.045


14+071.40 14.027 -3.00% -3.00% 14.000 14.189 14.189 14.000
14+072.80 13.982 -3.00% -3.00% 13.955 14.144 14.144 13.955
14+074.20 13.937 -3.00% -3.00% 13.910 14.099 14.099 13.910
14+075.60 13.892 -3.00% -3.00% 13.865 14.054 14.054 13.865
14+077.00 13.847 -3.00% -3.00% 13.820 14.009 14.009 13.820
14+078.40 13.802 -3.00% -3.00% 13.775 13.964 13.964 13.775
14+079.80 13.758 -3.00% -3.00% 13.731 13.920 13.920 13.731
14+081.20 13.713 -3.00% -3.00% 13.686 13.875 13.875 13.686
14+082.60 13.668 -3.00% -3.00% 13.641 13.830 13.830 13.641
14+084.00 13.623 -3.00% -3.00% 13.596 13.785 13.785 13.596
14+085.40 13.578 -3.00% -3.00% 13.551 13.740 13.740 13.551
14+086.80 13.533 -3.00% -3.00% 13.506 13.695 13.695 13.506
14+088.20 13.488 -3.00% -3.00% 13.461 13.650 13.650 13.461
14+089.60 13.443 -3.00% -3.00% 13.416 13.605 13.605 13.416
14+091.00 13.399 -3.00% -3.00% 13.372 13.561 13.561 13.372
14+092.40 13.354 -3.00% -3.00% 13.327 13.516 13.516 13.327
14+093.80 13.309 -3.00% -3.00% 13.282 13.471 13.471 13.282
14+095.20 13.264 -3.00% -3.00% 13.237 13.426 13.426 13.237
14+096.60 13.219 -3.00% -3.00% 13.192 13.381 13.381 13.192
14+098.00 13.174 -3.00% -3.00% 13.147 13.336 13.336 13.147
14+099.40 13.129 -3.00% -3.00% 13.102 13.291 13.291 13.102
14+100.80 13.084 -3.00% -3.00% 13.057 13.246 13.246 13.057
14+102.20 13.040 -3.00% -3.00% 13.013 13.202 13.202 13.013
14+103.60 12.995 -3.00% -3.00% 12.968 13.157 13.157 12.968
14+105.00 12.950 -3.00% -3.00% 12.923 13.112 13.112 12.923
14+106.40 12.905 -3.00% -3.00% 12.878 13.067 13.067 12.878
14+107.80 12.860 -3.00% -3.00% 12.833 13.022 13.022 12.833
14+109.20 12.815 -3.00% -3.00% 12.788 12.977 12.977 12.788
14+110.60 12.770 -3.00% -3.00% 12.743 12.932 12.932 12.743

336 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+112.00 12.726 -3.00% -3.00% 12.699 12.888 12.888 12.699


14+113.40 12.681 -3.00% -3.00% 12.654 12.843 12.843 12.654
14+114.80 12.636 -3.00% -3.00% 12.609 12.798 12.798 12.609
14+116.20 12.591 -3.00% -3.00% 12.564 12.753 12.753 12.564
14+117.60 12.546 -3.00% -3.00% 12.519 12.708 12.708 12.519
14+119.00 12.501 -3.00% -3.00% 12.474 12.663 12.663 12.474
14+120.40 12.456 -3.00% -3.00% 12.429 12.618 12.618 12.429
14+121.80 12.411 -3.00% -3.00% 12.384 12.573 12.573 12.384
14+123.20 12.367 -3.00% -3.00% 12.340 12.529 12.529 12.340
14+124.60 12.322 -3.00% -3.00% 12.295 12.484 12.484 12.295
14+126.00 12.277 -3.00% -3.00% 12.250 12.439 12.439 12.250
14+127.40 12.232 -3.00% -3.00% 12.205 12.394 12.394 12.205
14+128.80 12.187 -3.00% -3.00% 12.160 12.349 12.349 12.160
14+130.20 12.142 -3.00% -3.00% 12.115 12.304 12.304 12.115
14+131.60 12.097 -3.00% -3.00% 12.070 12.259 12.259 12.070
14+133.00 12.052 -3.00% -3.00% 12.025 12.214 12.214 12.025
14+134.40 12.008 -3.00% -3.00% 11.981 12.170 12.170 11.981
14+135.80 11.963 -3.00% -3.00% 11.936 12.125 12.125 11.936
14+137.20 11.918 -3.00% -3.00% 11.891 12.080 12.080 11.891
14+138.60 11.873 -3.00% -3.00% 11.846 12.035 12.035 11.846
14+140.00 11.828 -3.00% -3.00% 11.801 11.990 11.990 11.801
14+141.40 11.783 -3.00% -3.00% 11.756 11.945 11.945 11.756
14+142.80 11.738 -3.00% -3.00% 11.711 11.900 11.900 11.711
14+144.20 11.693 -3.00% -3.00% 11.666 11.855 11.855 11.666
14+145.60 11.649 -3.00% -3.00% 11.622 11.811 11.811 11.622
14+147.00 11.604 -3.00% -3.00% 11.577 11.766 11.766 11.577
14+148.40 11.559 -3.00% -3.00% 11.532 11.721 11.721 11.532
14+149.80 11.514 -3.00% -3.00% 11.487 11.676 11.676 11.487
14+151.20 11.469 -3.00% -3.00% 11.442 11.631 11.631 11.442
14+152.60 11.424 -3.00% -3.00% 11.397 11.586 11.586 11.397

337 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+154.00 11.379 -3.00% -3.00% 11.352 11.541 11.541 11.352


14+155.40 11.334 -3.00% -3.00% 11.307 11.496 11.496 11.307
14+156.80 11.290 -3.00% -3.00% 11.263 11.452 11.452 11.263
14+158.20 11.245 -3.00% -3.00% 11.218 11.407 11.407 11.218
14+159.60 11.200 -3.00% -3.00% 11.173 11.362 11.362 11.173
14+161.00 11.155 -3.00% -3.00% 11.128 11.317 11.317 11.128
14+162.40 11.110 -3.00% -3.00% 11.083 11.272 11.272 11.083
14+163.80 11.065 -3.00% -3.00% 11.038 11.227 11.227 11.038
14+165.20 11.020 -3.00% -3.00% 10.993 11.182 11.182 10.993
14+166.60 10.976 -3.00% -3.00% 10.949 11.138 11.138 10.949
14+168.00 10.931 -3.00% -3.00% 10.904 11.093 11.093 10.904
14+169.40 10.888 -3.00% -3.00% 10.861 11.050 11.050 10.861
14+170.80 10.845 -3.00% -3.00% 10.818 11.007 11.007 10.818
14+172.20 10.802 -3.00% -3.00% 10.775 10.964 10.964 10.775
14+173.60 10.760 -3.00% -3.00% 10.733 10.922 10.922 10.733
14+175.00 10.719 -3.00% -3.00% 10.692 10.881 10.881 10.692
14+176.40 10.678 -3.00% -3.00% 10.651 10.840 10.840 10.651
14+177.80 10.638 -3.00% -3.00% 10.611 10.800 10.800 10.611
14+179.20 10.599 -3.00% -3.00% 10.572 10.761 10.761 10.572
14+180.60 10.560 -3.00% -3.00% 10.533 10.722 10.722 10.533
14+182.00 10.522 -3.00% -3.00% 10.495 10.684 10.684 10.495
14+183.40 10.484 -3.00% -3.00% 10.457 10.646 10.646 10.457
14+184.80 10.447 -3.00% -3.00% 10.420 10.609 10.609 10.420
14+186.20 10.410 -3.00% -3.00% 10.383 10.572 10.572 10.383
14+187.60 10.374 -3.00% -3.00% 10.347 10.536 10.536 10.347
14+189.00 10.339 -3.00% -3.00% 10.312 10.501 10.501 10.312
14+190.40 10.304 -3.00% -3.00% 10.277 10.466 10.466 10.277
14+191.80 10.270 -3.00% -3.00% 10.243 10.432 10.432 10.243
14+193.20 10.236 -3.00% -3.00% 10.209 10.398 10.398 10.209
14+194.60 10.204 -3.00% -3.00% 10.177 10.366 10.366 10.177

338 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+196.00 10.171 -3.00% -3.00% 10.144 10.333 10.333 10.144


14+197.40 10.139 -3.00% -3.00% 10.112 10.301 10.301 10.112
14+198.80 10.108 -3.00% -3.00% 10.081 10.270 10.270 10.081
14+200.20 10.078 -3.00% -3.00% 10.051 10.240 10.240 10.051
14+201.60 10.048 -3.00% -3.00% 10.021 10.210 10.210 10.021
14+203.00 10.018 -3.00% -3.00% 9.991 10.180 10.180 9.991
14+204.40 9.990 -3.00% -3.00% 9.963 10.152 10.152 9.963
14+205.80 9.961 -3.00% -3.00% 9.934 10.123 10.123 9.934
14+207.20 9.934 -3.00% -3.00% 9.907 10.096 10.096 9.907
14+208.60 9.907 -3.00% -3.00% 9.880 10.069 10.069 9.880
14+210.00 9.880 -3.00% -3.00% 9.853 10.042 10.042 9.853
14+211.40 9.855 -3.00% -3.00% 9.828 10.017 10.017 9.828
14+212.80 9.829 -3.00% -3.00% 9.802 9.991 9.991 9.802
14+214.20 9.805 -3.00% -3.00% 9.778 9.967 9.967 9.778
14+215.60 9.781 -3.00% -3.00% 9.754 9.943 9.943 9.754
14+217.00 9.757 -3.00% -3.00% 9.730 9.919 9.919 9.730
14+218.40 9.735 -3.00% -3.00% 9.708 9.897 9.897 9.708
14+219.80 9.712 -3.00% -3.00% 9.685 9.874 9.874 9.685
14+221.20 9.691 -3.00% -3.00% 9.664 9.853 9.853 9.664
14+222.60 9.670 -3.00% -3.00% 9.643 9.832 9.832 9.643
14+224.00 9.649 -2.82% -3.00% 9.631 9.808 9.811 9.622
14+225.40 9.629 -2.62% -3.00% 9.620 9.786 9.791 9.602
14+226.80 9.610 -2.43% -3.00% 9.611 9.764 9.772 9.583
14+228.20 9.591 -2.24% -3.00% 9.601 9.742 9.753 9.564
14+229.60 9.573 -2.04% -3.00% 9.593 9.722 9.735 9.546
14+231.00 9.556 -1.85% -3.00% 9.585 9.702 9.718 9.529
14+232.40 9.539 -1.65% -3.00% 9.578 9.682 9.701 9.512
14+233.80 9.523 -1.46% -3.00% 9.571 9.663 9.685 9.496
14+235.20 9.507 -1.27% -3.00% 9.565 9.645 9.669 9.480
14+236.60 9.492 -1.07% -3.00% 9.559 9.627 9.654 9.465

339 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+238.00 9.477 -0.88% -3.00% 9.554 9.609 9.639 9.450


14+239.40 9.464 -0.69% -3.00% 9.550 9.594 9.626 9.437
14+240.80 9.450 -0.49% -3.00% 9.546 9.577 9.612 9.423
14+242.20 9.438 -0.30% -3.00% 9.543 9.562 9.600 9.411
14+243.60 9.425 -0.10% -3.00% 9.540 9.546 9.587 9.398
14+245.00 9.414 0.09% -3.00% 9.538 9.533 9.576 9.387
14+246.40 9.403 0.28% -3.00% 9.537 9.519 9.565 9.376
14+247.80 9.393 0.48% -3.00% 9.536 9.506 9.555 9.366
14+249.20 9.383 0.67% -3.00% 9.536 9.494 9.545 9.356
14+250.60 9.374 0.87% -3.00% 9.536 9.482 9.536 9.347
14+252.00 9.365 1.06% -3.00% 9.537 9.470 9.527 9.338
14+253.40 9.357 1.25% -3.00% 9.538 9.459 9.519 9.330
14+254.80 9.350 1.45% -3.00% 9.541 9.450 9.512 9.323
14+256.20 9.343 1.64% -3.00% 9.543 9.440 9.505 9.316
14+257.60 9.337 1.83% -3.00% 9.547 9.431 9.499 9.310
14+259.00 9.331 2.03% -3.00% 9.550 9.423 9.493 9.304
14+260.40 9.326 2.22% -3.00% 9.555 9.415 9.488 9.299
14+261.80 9.322 2.42% -3.00% 9.560 9.408 9.484 9.295
14+263.20 9.318 2.61% -3.00% 9.566 9.401 9.480 9.291
14+264.60 9.315 2.80% -3.00% 9.572 9.396 9.477 9.288
14+266.00 9.313 3.00% -3.00% 9.580 9.391 9.475 9.286
14+267.40 9.310 3.19% -3.19% 9.586 9.385 9.475 9.274
14+268.80 9.308 3.39% -3.38% 9.594 9.381 9.475 9.262
14+270.20 9.305 3.58% -3.58% 9.600 9.375 9.475 9.250
14+271.60 9.303 3.77% -3.77% 9.608 9.370 9.476 9.238
14+273.00 9.300 3.97% -3.97% 9.614 9.364 9.476 9.226
14+274.40 9.298 4.16% -4.16% 9.622 9.360 9.476 9.214
14+275.80 9.295 4.35% -4.35% 9.628 9.354 9.476 9.202
14+277.20 9.293 4.55% -4.55% 9.636 9.349 9.477 9.190
14+278.60 9.290 4.74% -4.74% 9.642 9.344 9.476 9.178

340 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+280.00 9.288 4.94% -4.94% 9.650 9.339 9.477 9.166


14+281.40 9.285 5.13% -5.13% 9.656 9.333 9.477 9.154
14+282.80 9.283 5.32% -5.32% 9.664 9.328 9.478 9.142
14+284.20 9.281 5.40% -5.40% 9.666 9.325 9.477 9.136
14+285.60 9.278 5.40% -5.40% 9.663 9.322 9.474 9.133
14+287.00 9.276 5.40% -5.40% 9.661 9.320 9.472 9.131
14+288.40 9.273 5.40% -5.40% 9.658 9.317 9.469 9.128
14+289.80 9.271 5.40% -5.40% 9.656 9.315 9.467 9.126
14+291.20 9.268 5.40% -5.40% 9.653 9.312 9.464 9.123
14+292.60 9.266 5.40% -5.40% 9.651 9.310 9.462 9.121
14+294.00 9.263 5.40% -5.40% 9.648 9.307 9.459 9.118
14+295.40 9.261 5.40% -5.40% 9.646 9.305 9.457 9.116
14+296.80 9.258 5.40% -5.40% 9.643 9.302 9.454 9.113
14+298.20 9.256 5.40% -5.40% 9.641 9.300 9.452 9.111
14+299.60 9.253 5.40% -5.40% 9.638 9.297 9.449 9.108
14+301.00 9.251 5.40% -5.40% 9.636 9.295 9.447 9.106
14+302.40 9.249 5.40% -5.40% 9.634 9.293 9.445 9.104
14+303.80 9.246 5.40% -5.40% 9.631 9.290 9.442 9.101
14+305.20 9.244 5.40% -5.40% 9.629 9.288 9.440 9.099
14+306.60 9.241 5.40% -5.40% 9.626 9.285 9.437 9.096
14+308.00 9.239 5.40% -5.40% 9.624 9.283 9.435 9.094
14+309.40 9.236 5.40% -5.40% 9.621 9.280 9.432 9.091
14+310.80 9.234 5.40% -5.40% 9.619 9.278 9.430 9.089
14+312.20 9.231 5.40% -5.40% 9.616 9.275 9.427 9.086
14+313.60 9.229 5.40% -5.40% 9.614 9.273 9.425 9.084
14+315.00 9.226 5.40% -5.40% 9.611 9.270 9.422 9.081
14+316.40 9.224 5.40% -5.40% 9.609 9.268 9.420 9.079
14+317.80 9.221 5.40% -5.40% 9.606 9.265 9.417 9.076
14+319.20 9.219 5.40% -5.40% 9.604 9.263 9.415 9.074
14+320.60 9.217 5.40% -5.40% 9.602 9.261 9.413 9.072

341 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+322.00 9.214 5.40% -5.40% 9.599 9.258 9.410 9.069


14+323.40 9.212 5.40% -5.40% 9.597 9.256 9.408 9.067
14+324.80 9.209 5.40% -5.40% 9.594 9.253 9.405 9.064
14+326.20 9.207 5.40% -5.40% 9.592 9.251 9.403 9.062
14+327.60 9.204 5.40% -5.40% 9.589 9.248 9.400 9.059
14+329.00 9.202 5.40% -5.40% 9.587 9.246 9.398 9.057
14+330.40 9.200 5.40% -5.40% 9.585 9.244 9.396 9.055
14+331.80 9.198 5.40% -5.40% 9.583 9.242 9.394 9.053
14+333.20 9.196 5.40% -5.40% 9.581 9.240 9.392 9.051
14+334.60 9.194 5.40% -5.40% 9.579 9.238 9.390 9.049
14+336.00 9.193 5.40% -5.40% 9.578 9.237 9.389 9.048
14+337.40 9.191 5.40% -5.40% 9.576 9.235 9.387 9.046
14+338.80 9.190 5.40% -5.40% 9.575 9.234 9.386 9.045
14+340.20 9.189 5.40% -5.40% 9.574 9.233 9.385 9.044
14+341.60 9.188 5.40% -5.40% 9.573 9.232 9.384 9.043
14+343.00 9.188 5.40% -5.40% 9.573 9.232 9.384 9.043
14+344.40 9.187 5.40% -5.40% 9.572 9.231 9.383 9.042
14+345.80 9.187 5.40% -5.40% 9.572 9.231 9.383 9.042
14+347.20 9.187 5.40% -5.40% 9.572 9.231 9.383 9.042
14+348.60 9.187 5.40% -5.40% 9.572 9.231 9.383 9.042
14+350.00 9.187 5.40% -5.40% 9.572 9.231 9.383 9.042
14+351.40 9.188 5.40% -5.40% 9.573 9.232 9.384 9.043
14+352.80 9.188 5.40% -5.40% 9.573 9.232 9.384 9.043
14+354.20 9.189 5.40% -5.40% 9.574 9.233 9.385 9.044
14+355.60 9.190 5.40% -5.40% 9.575 9.234 9.386 9.045
14+357.00 9.191 5.40% -5.40% 9.576 9.235 9.387 9.046
14+358.40 9.192 5.40% -5.40% 9.577 9.236 9.388 9.047
14+359.80 9.194 5.40% -5.40% 9.579 9.238 9.390 9.049
14+361.20 9.195 5.40% -5.40% 9.580 9.239 9.391 9.050
14+362.60 9.197 5.40% -5.40% 9.582 9.241 9.393 9.052

342 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+364.00 9.199 5.40% -5.40% 9.584 9.243 9.395 9.054


14+365.40 9.201 5.40% -5.40% 9.586 9.245 9.397 9.056
14+366.80 9.203 5.40% -5.40% 9.588 9.247 9.399 9.058
14+368.20 9.206 5.40% -5.40% 9.591 9.250 9.402 9.061
14+369.60 9.209 5.40% -5.40% 9.594 9.253 9.405 9.064
14+371.00 9.211 5.40% -5.40% 9.596 9.255 9.407 9.066
14+372.40 9.214 5.40% -5.40% 9.599 9.258 9.410 9.069
14+373.80 9.218 5.40% -5.40% 9.603 9.262 9.414 9.073
14+375.20 9.221 5.40% -5.40% 9.606 9.265 9.417 9.076
14+376.60 9.224 5.40% -5.40% 9.609 9.268 9.420 9.079
14+378.00 9.228 5.40% -5.40% 9.613 9.272 9.424 9.083
14+379.40 9.232 5.40% -5.40% 9.617 9.276 9.428 9.087
14+380.80 9.236 5.40% -5.40% 9.621 9.280 9.432 9.091
14+382.20 9.240 5.40% -5.40% 9.625 9.284 9.436 9.095
14+383.60 9.245 5.40% -5.40% 9.630 9.289 9.441 9.100
14+385.00 9.249 5.40% -5.40% 9.634 9.293 9.445 9.104
14+386.40 9.254 5.40% -5.40% 9.639 9.298 9.450 9.109
14+387.80 9.259 5.40% -5.40% 9.644 9.303 9.455 9.114
14+389.20 9.264 5.40% -5.40% 9.649 9.308 9.460 9.119
14+390.60 9.269 5.40% -5.40% 9.654 9.313 9.465 9.124
14+392.00 9.275 5.40% -5.40% 9.660 9.319 9.471 9.130
14+393.40 9.280 5.40% -5.40% 9.665 9.324 9.476 9.135
14+394.80 9.286 5.40% -5.40% 9.671 9.330 9.482 9.141
14+396.20 9.292 5.40% -5.40% 9.677 9.336 9.488 9.147
14+397.60 9.298 5.40% -5.40% 9.683 9.342 9.494 9.153
14+399.00 9.304 5.40% -5.40% 9.689 9.348 9.500 9.159
14+400.40 9.311 5.40% -5.40% 9.696 9.355 9.507 9.166
14+401.80 9.318 5.40% -5.40% 9.703 9.362 9.514 9.173
14+403.20 9.324 5.40% -5.40% 9.709 9.368 9.520 9.179
14+404.60 9.331 5.40% -5.40% 9.716 9.375 9.527 9.186

343 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+406.00 9.339 5.40% -5.40% 9.724 9.383 9.535 9.194


14+407.40 9.346 5.40% -5.40% 9.731 9.390 9.542 9.201
14+408.80 9.353 5.40% -5.40% 9.738 9.397 9.549 9.208
14+410.20 9.361 5.40% -5.40% 9.746 9.405 9.557 9.216
14+411.60 9.369 5.40% -5.40% 9.754 9.413 9.565 9.224
14+413.00 9.377 5.40% -5.40% 9.762 9.421 9.573 9.232
14+414.40 9.385 5.40% -5.40% 9.770 9.429 9.581 9.240
14+415.80 9.394 5.40% -5.40% 9.779 9.438 9.590 9.249
14+417.20 9.402 5.40% -5.40% 9.787 9.446 9.598 9.257
14+418.60 9.411 5.40% -5.40% 9.796 9.455 9.607 9.266
14+420.00 9.420 5.40% -5.40% 9.805 9.464 9.616 9.275
14+421.40 9.429 5.40% -5.40% 9.814 9.473 9.625 9.284
14+422.80 9.438 5.40% -5.40% 9.823 9.482 9.634 9.293
14+424.20 9.448 5.40% -5.40% 9.833 9.492 9.644 9.303
14+425.60 9.457 5.40% -5.40% 9.842 9.501 9.653 9.312
14+427.00 9.467 5.40% -5.40% 9.852 9.511 9.663 9.322
14+428.40 9.477 5.40% -5.40% 9.862 9.521 9.673 9.332
14+429.80 9.487 5.40% -5.40% 9.872 9.531 9.683 9.342
14+431.20 9.497 5.40% -5.40% 9.882 9.541 9.693 9.352
14+432.60 9.508 5.40% -5.40% 9.893 9.552 9.704 9.363
14+434.00 9.518 5.40% -5.40% 9.903 9.562 9.714 9.373
14+435.40 9.529 5.40% -5.40% 9.914 9.573 9.725 9.384
14+436.80 9.539 5.40% -5.40% 9.924 9.583 9.735 9.394
14+438.20 9.550 5.40% -5.40% 9.935 9.594 9.746 9.405
14+439.60 9.560 5.40% -5.40% 9.945 9.604 9.756 9.415
14+441.00 9.571 5.40% -5.40% 9.956 9.615 9.767 9.426
14+442.40 9.581 5.40% -5.40% 9.966 9.625 9.777 9.436
14+443.80 9.592 5.40% -5.40% 9.977 9.636 9.788 9.447
14+445.20 9.603 5.40% -5.40% 9.988 9.647 9.799 9.458
14+446.60 9.613 5.40% -5.40% 9.998 9.657 9.809 9.468

344 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+448.00 9.624 5.40% -5.40% 10.009 9.668 9.820 9.479


14+449.40 9.634 5.40% -5.40% 10.019 9.678 9.830 9.489
14+450.80 9.645 5.40% -5.40% 10.030 9.689 9.841 9.500
14+452.20 9.655 5.40% -5.40% 10.040 9.699 9.851 9.510
14+453.60 9.666 5.40% -5.40% 10.051 9.710 9.862 9.521
14+455.00 9.676 5.40% -5.40% 10.061 9.720 9.872 9.531
14+456.40 9.687 5.40% -5.40% 10.072 9.731 9.883 9.542
14+457.80 9.697 5.40% -5.40% 10.082 9.741 9.893 9.552
14+459.20 9.708 5.40% -5.40% 10.093 9.752 9.904 9.563
14+460.60 9.718 5.40% -5.40% 10.103 9.762 9.914 9.573
14+462.00 9.728 5.40% -5.40% 10.113 9.772 9.924 9.583
14+463.40 9.738 5.20% -5.20% 10.113 9.785 9.931 9.603
14+464.80 9.747 5.01% -5.01% 10.113 9.797 9.937 9.621
14+466.20 9.756 4.82% -4.82% 10.112 9.809 9.943 9.640
14+467.60 9.765 4.62% -4.62% 10.112 9.820 9.950 9.658
14+469.00 9.774 4.43% -4.43% 10.111 9.832 9.956 9.677
14+470.40 9.782 4.24% -4.24% 10.110 9.843 9.961 9.694
14+471.80 9.790 4.04% -4.04% 10.108 9.853 9.967 9.712
14+473.20 9.798 3.85% -3.85% 10.107 9.864 9.972 9.729
14+474.60 9.805 3.65% -3.65% 10.104 9.874 9.976 9.746
14+476.00 9.812 3.46% -3.46% 10.102 9.884 9.980 9.762
14+477.40 9.819 3.27% -3.27% 10.099 9.893 9.985 9.779
14+478.80 9.825 3.07% -3.07% 10.096 9.902 9.988 9.794
14+480.20 9.832 2.88% -3.00% 10.093 9.912 9.994 9.805
14+481.60 9.838 2.68% -3.00% 10.090 9.920 10.000 9.811
14+483.00 9.843 2.49% -3.00% 10.085 9.928 10.005 9.816
14+484.40 9.849 2.30% -3.00% 10.082 9.937 10.011 9.822
14+485.80 9.854 2.10% -3.00% 10.077 9.945 10.016 9.827
14+487.20 9.858 1.91% -3.00% 10.072 9.951 10.020 9.831
14+488.60 9.863 1.72% -3.00% 10.067 9.959 10.025 9.836

345 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+490.00 9.867 1.52% -3.00% 10.062 9.966 10.029 9.840


14+491.40 9.871 1.33% -3.00% 10.056 9.972 10.033 9.844
14+492.80 9.874 1.13% -3.00% 10.050 9.978 10.036 9.847
14+494.20 9.878 0.94% -3.00% 10.044 9.985 10.040 9.851
14+495.60 9.881 0.75% -3.00% 10.038 9.991 10.043 9.854
14+497.00 9.883 0.55% -3.00% 10.030 9.995 10.045 9.856
14+498.40 9.886 0.36% -3.00% 10.024 10.001 10.048 9.859
14+499.80 9.888 0.17% -3.00% 10.016 10.006 10.050 9.861
14+501.20 9.889 -0.03% -3.00% 10.008 10.009 10.051 9.862
14+502.60 9.891 -0.22% -3.00% 10.000 10.014 10.053 9.864
14+504.00 9.892 -0.42% -3.00% 9.992 10.018 10.054 9.865
14+505.40 9.893 -0.61% -3.00% 9.983 10.022 10.055 9.866
14+506.80 9.894 -0.80% -3.00% 9.975 10.025 10.056 9.867
14+508.20 9.894 -1.00% -3.00% 9.965 10.028 10.056 9.867
14+509.60 9.894 -1.19% -3.00% 9.956 10.031 10.056 9.867
14+511.00 9.894 -1.39% -3.00% 9.946 10.033 10.056 9.867
14+512.40 9.893 -1.58% -3.00% 9.936 10.035 10.055 9.866
14+513.80 9.892 -1.77% -3.00% 9.925 10.037 10.054 9.865
14+515.20 9.891 -1.97% -3.00% 9.915 10.039 10.053 9.864
14+516.60 9.890 -2.16% -3.00% 9.904 10.040 10.052 9.863
14+518.00 9.888 -2.35% -3.00% 9.893 10.041 10.050 9.861
14+519.40 9.886 -2.55% -3.00% 9.881 10.042 10.048 9.859
14+520.80 9.884 -2.74% -3.00% 9.870 10.042 10.046 9.857
14+522.20 9.881 -2.94% -3.00% 9.857 10.042 10.043 9.854
14+523.60 9.878 -3.00% -3.00% 9.851 10.040 10.040 9.851
14+525.00 9.875 -3.00% -3.00% 9.848 10.037 10.037 9.848
14+526.40 9.872 -3.00% -3.00% 9.845 10.034 10.034 9.845
14+527.80 9.868 -3.00% -3.00% 9.841 10.030 10.030 9.841
14+529.20 9.864 -3.00% -3.00% 9.837 10.026 10.026 9.837
14+530.60 9.859 -3.00% -3.00% 9.832 10.021 10.021 9.832

346 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+532.00 9.855 -3.00% -3.00% 9.828 10.017 10.017 9.828


14+533.40 9.850 -3.00% -3.00% 9.823 10.012 10.012 9.823
14+534.80 9.844 -3.00% -3.00% 9.817 10.006 10.006 9.817
14+536.20 9.839 -3.00% -3.00% 9.812 10.001 10.001 9.812
14+537.60 9.833 -3.00% -3.00% 9.806 9.995 9.995 9.806
14+539.00 9.827 -3.00% -3.00% 9.800 9.989 9.989 9.800
14+540.40 9.820 -3.00% -3.00% 9.793 9.982 9.982 9.793
14+541.80 9.814 -3.00% -3.00% 9.787 9.976 9.976 9.787
14+543.20 9.807 -3.00% -3.00% 9.780 9.969 9.969 9.780
14+544.60 9.799 -3.00% -3.00% 9.772 9.961 9.961 9.772
14+546.00 9.792 -3.00% -3.00% 9.765 9.954 9.954 9.765
14+547.40 9.784 -3.00% -3.00% 9.757 9.946 9.946 9.757
14+548.80 9.776 -3.00% -3.00% 9.749 9.938 9.938 9.749
14+550.20 9.767 -3.00% -3.00% 9.740 9.929 9.929 9.740
14+551.60 9.758 -3.00% -3.00% 9.731 9.920 9.920 9.731
14+553.00 9.749 -3.00% -3.00% 9.722 9.911 9.911 9.722
14+554.40 9.740 -3.00% -3.00% 9.713 9.902 9.902 9.713
14+555.80 9.730 -3.00% -3.00% 9.703 9.892 9.892 9.703
14+557.20 9.720 -3.00% -3.00% 9.693 9.882 9.882 9.693
14+558.60 9.710 -3.00% -3.00% 9.683 9.872 9.872 9.683
14+560.00 9.699 -3.00% -3.00% 9.672 9.861 9.861 9.672
14+561.40 9.689 -3.00% -3.00% 9.662 9.851 9.851 9.662
14+562.80 9.678 -3.00% -3.00% 9.651 9.840 9.840 9.651
14+564.20 9.666 -3.00% -3.00% 9.639 9.828 9.828 9.639
14+565.60 9.655 -3.00% -3.00% 9.628 9.817 9.817 9.628
14+567.00 9.643 -3.00% -3.00% 9.616 9.805 9.805 9.616
14+568.40 9.631 -3.00% -3.00% 9.604 9.793 9.793 9.604
14+569.80 9.620 -3.00% -3.00% 9.593 9.782 9.782 9.593
14+571.20 9.608 -3.00% -3.00% 9.581 9.770 9.770 9.581
14+572.60 9.597 -3.00% -3.00% 9.570 9.759 9.759 9.570

347 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+574.00 9.585 -3.00% -3.00% 9.558 9.747 9.747 9.558


14+575.40 9.573 -3.00% -3.00% 9.546 9.735 9.735 9.546
14+576.80 9.562 -3.00% -3.00% 9.535 9.724 9.724 9.535
14+578.20 9.550 -3.00% -3.00% 9.523 9.712 9.712 9.523
14+579.60 9.539 -3.00% -3.00% 9.512 9.701 9.701 9.512
14+581.00 9.527 -3.00% -3.00% 9.500 9.689 9.689 9.500
14+582.40 9.516 -3.00% -3.00% 9.489 9.678 9.678 9.489
14+583.80 9.504 -3.00% -3.00% 9.477 9.666 9.666 9.477
14+585.20 9.492 -3.00% -3.00% 9.465 9.654 9.654 9.465
14+586.60 9.481 -3.00% -3.00% 9.454 9.643 9.643 9.454
14+588.00 9.469 -3.00% -3.00% 9.442 9.631 9.631 9.442
14+589.40 9.458 -3.00% -3.00% 9.431 9.620 9.620 9.431
14+590.80 9.446 -3.00% -3.00% 9.419 9.608 9.608 9.419
14+592.20 9.435 -3.00% -3.00% 9.408 9.597 9.597 9.408
14+593.60 9.423 -3.00% -3.00% 9.396 9.585 9.585 9.396
14+595.00 9.411 -3.00% -3.00% 9.384 9.573 9.573 9.384
14+596.40 9.400 -3.00% -3.00% 9.373 9.562 9.562 9.373
14+597.80 9.388 -3.00% -3.00% 9.361 9.550 9.550 9.361
14+599.20 9.377 -3.00% -3.00% 9.350 9.539 9.539 9.350
14+600.60 9.365 -3.00% -3.00% 9.338 9.527 9.527 9.338
14+602.00 9.354 -3.00% -3.00% 9.327 9.516 9.516 9.327
14+603.40 9.342 -3.00% -3.00% 9.315 9.504 9.504 9.315
14+604.80 9.330 -3.00% -3.00% 9.303 9.492 9.492 9.303
14+606.20 9.319 -3.00% -3.00% 9.292 9.481 9.481 9.292
14+607.60 9.307 -3.00% -3.00% 9.280 9.469 9.469 9.280
14+609.00 9.296 -3.00% -3.00% 9.269 9.458 9.458 9.269
14+610.40 9.284 -3.00% -3.00% 9.257 9.446 9.446 9.257
14+611.80 9.273 -3.00% -3.00% 9.246 9.435 9.435 9.246
14+613.20 9.261 -3.00% -3.00% 9.234 9.423 9.423 9.234
14+614.60 9.249 -3.00% -3.00% 9.222 9.411 9.411 9.222

348 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+616.00 9.238 -3.00% -3.00% 9.211 9.400 9.400 9.211


14+617.40 9.226 -3.00% -3.00% 9.199 9.388 9.388 9.199
14+618.80 9.215 -3.00% -3.00% 9.188 9.377 9.377 9.188
14+620.20 9.203 -3.00% -3.00% 9.176 9.365 9.365 9.176
14+621.60 9.192 -3.00% -3.00% 9.165 9.354 9.354 9.165
14+623.00 9.180 -3.00% -3.00% 9.153 9.342 9.342 9.153
14+624.40 9.168 -3.00% -3.00% 9.141 9.330 9.330 9.141
14+625.80 9.157 -3.00% -3.00% 9.130 9.319 9.319 9.130
14+627.20 9.145 -3.00% -3.00% 9.118 9.307 9.307 9.118
14+628.60 9.134 -3.00% -3.00% 9.107 9.296 9.296 9.107
14+630.00 9.122 -3.00% -3.00% 9.095 9.284 9.284 9.095
14+631.40 9.111 -3.00% -3.00% 9.084 9.273 9.273 9.084
14+632.80 9.099 -3.00% -3.00% 9.072 9.261 9.261 9.072
14+634.20 9.087 -3.00% -3.00% 9.060 9.249 9.249 9.060
14+635.60 9.076 -3.00% -3.00% 9.049 9.238 9.238 9.049
14+637.00 9.064 -3.00% -3.00% 9.037 9.226 9.226 9.037
14+638.40 9.053 -3.00% -3.00% 9.026 9.215 9.215 9.026
14+639.80 9.041 -3.00% -3.00% 9.014 9.203 9.203 9.014
14+641.20 9.029 -3.00% -3.00% 9.002 9.191 9.191 9.002
14+642.60 9.018 -3.00% -3.00% 8.991 9.180 9.180 8.991
14+644.00 9.006 -3.00% -3.00% 8.979 9.168 9.168 8.979
14+645.40 8.995 -3.00% -3.00% 8.968 9.157 9.157 8.968
14+646.80 8.983 -3.00% -3.00% 8.956 9.145 9.145 8.956
14+648.20 8.972 -3.00% -3.00% 8.945 9.134 9.134 8.945
14+649.60 8.960 -3.00% -3.00% 8.933 9.122 9.122 8.933
14+651.00 8.948 -3.00% -3.00% 8.921 9.110 9.110 8.921
14+652.40 8.937 -3.00% -3.00% 8.910 9.099 9.099 8.910
14+653.80 8.925 -3.00% -3.00% 8.898 9.087 9.087 8.898
14+655.20 8.914 -3.00% -3.00% 8.887 9.076 9.076 8.887
14+656.60 8.902 -3.00% -3.00% 8.875 9.064 9.064 8.875

349 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+658.00 8.891 -3.00% -3.00% 8.864 9.053 9.053 8.864


14+659.40 8.879 -3.00% -3.00% 8.852 9.041 9.041 8.852
14+660.80 8.867 -3.00% -3.00% 8.840 9.029 9.029 8.840
14+662.20 8.856 -3.00% -3.00% 8.829 9.018 9.018 8.829
14+663.60 8.844 -3.00% -3.00% 8.817 9.006 9.006 8.817
14+665.00 8.833 -3.00% -3.00% 8.806 8.995 8.995 8.806
14+666.40 8.821 -3.00% -3.00% 8.794 8.983 8.983 8.794
14+667.80 8.810 -3.00% -3.00% 8.783 8.972 8.972 8.783
14+669.20 8.798 -3.00% -3.00% 8.771 8.960 8.960 8.771
14+670.60 8.786 -3.00% -3.00% 8.759 8.948 8.948 8.759
14+672.00 8.775 -3.00% -3.00% 8.748 8.937 8.937 8.748
14+673.40 8.763 -3.00% -3.00% 8.736 8.925 8.925 8.736
14+674.80 8.752 -3.00% -3.00% 8.725 8.914 8.914 8.725
14+676.20 8.740 -3.00% -3.00% 8.713 8.902 8.902 8.713
14+677.60 8.729 -3.00% -3.00% 8.702 8.891 8.891 8.702
14+679.00 8.717 -3.00% -3.00% 8.690 8.879 8.879 8.690
14+680.40 8.705 -3.00% -3.00% 8.678 8.867 8.867 8.678
14+681.80 8.694 -3.00% -3.00% 8.667 8.856 8.856 8.667
14+683.20 8.682 -3.00% -3.00% 8.655 8.844 8.844 8.655
14+684.60 8.671 -3.00% -3.00% 8.644 8.833 8.833 8.644
14+686.00 8.659 -3.00% -3.00% 8.632 8.821 8.821 8.632
14+687.40 8.648 -3.00% -3.00% 8.621 8.810 8.810 8.621
14+688.80 8.636 -3.00% -3.00% 8.609 8.798 8.798 8.609
14+690.20 8.624 -3.00% -3.00% 8.597 8.786 8.786 8.597
14+691.60 8.613 -3.00% -3.00% 8.586 8.775 8.775 8.586
14+693.00 8.601 -3.00% -3.00% 8.574 8.763 8.763 8.574
14+694.40 8.590 -3.00% -3.00% 8.563 8.752 8.752 8.563
14+695.80 8.578 -3.00% -3.00% 8.551 8.740 8.740 8.551
14+697.20 8.567 -3.00% -3.00% 8.540 8.729 8.729 8.540
14+698.60 8.555 -3.00% -3.00% 8.528 8.717 8.717 8.528

350 de 351
LLANSA INGENIEROS S.A
PROYECTO: MEJORAMIENTO DE CARRETERA COSIGUINA POTOSI
TRAMO 14.1 KM
PREPARADO POR: ING. OSMAN RODRIGUEZ
FORMATO DE NIVELACION PARA CABLE GUIA DE PAVIMENTACION
Nivel Guia Nivel GC C- Nivel Guía
Estación Rasante Bombeo Izq Bombeo der Nivel GC C-Der
Izquierda Izq Derecha

14+700.00 8.543 -3.00% -3.00% 8.516 8.705 8.705 8.516


14+701.40 8.532 -3.00% -3.00% 8.505 8.694 8.694 8.505
14+702.80 8.520 -3.00% -3.00% 8.493 8.682 8.682 8.493
14+704.20 8.509 -3.00% -3.00% 8.482 8.671 8.671 8.482
14+705.60 8.497 -3.00% -3.00% 8.470 8.659 8.659 8.470
14+707.00 8.486 -3.00% -3.00% 8.459 8.648 8.648 8.459
14+708.40 8.474 -3.00% -3.00% 8.447 8.636 8.636 8.447
14+709.80 8.462 -3.00% -3.00% 8.435 8.624 8.624 8.435
14+711.20 8.451 -3.00% -3.00% 8.424 8.613 8.613 8.424
14+712.60 8.439 -3.00% -3.00% 8.412 8.601 8.601 8.412
14+714.00 8.428 -3.00% -3.00% 8.401 8.590 8.590 8.401
14+715.40 8.416 -3.00% -3.00% 8.389 8.578 8.578 8.389
14+716.80 8.404 -3.00% -3.00% 8.377 8.566 8.566 8.377
14+718.20 8.393 -3.00% -3.00% 8.366 8.555 8.555 8.366
14+719.60 8.381 -3.00% -3.00% 8.354 8.543 8.543 8.354
14+721.00 8.370 -3.00% -3.00% 8.343 8.532 8.532 8.343
14+722.40 8.358 -3.00% -3.00% 8.331 8.520 8.520 8.331
14+723.80 8.347 -3.00% -3.00% 8.320 8.509 8.509 8.320
14+725.20 8.335 -3.00% -3.00% 8.308 8.497 8.497 8.308
14+725.50 8.333 -3.00% -3.00% 8.306 8.495 8.495 8.306