DISEÑO GEOMETRICO DE BADEN

TIPO1 6m
BADEN TRIANGULAR

L1 L2

S= 5% H S= 5%

2.5%
SL
SL

L1 L2

Caudal de diseño = 1.15 m3/seg


Cálculos:
S= 5.00%
L1 = 3.00 m H= 0.15 m n = 0.015
L2 = 3.00 m SL = 0.050 m/m mampostería de piedra
Z= 20.00
Empleando la formula de Manning

2/ 3 1 /2 A= 0.450 m2
A∗R ∗S
Q= P= 6.007 m
n R= 0.075 m

QBadénQ = 1.19 m3/seg CONFORME


DISEÑO GEOMETRICO DE BADEN LONGITUD 12.00 M
18 +780.00 KM
TIPO 2 12 m
BADEN TRAPEZOIDAL

12.00 m
L1=3.50 m L2=5.00 m L3=3.50 m

S = 5%
S = 5%
h
L'1 S = 0% L'2

Caudal de diseño = 1.58 m3/seg


Cálculos:

L1= 3.50 m n= 0.015 para concreto


L'1= 3.5044 m
L2= 5.00 m
L3= 3.50 m
L'3= 3.5044 m
h= 0.18 m
z= 20.00 m
SLonitudinal= 5.00%
Stransversal= 2.50%

Empleando la formula de Manning

A= 1.488 m2
A∗R2/ 3∗S1 /2
Q= P= 12.009 m
n R= 0.124 m

QBadénQ = 3.90 m3/seg CONFORME


DISEÑO GEOMETRICO DE BADEN
TIPO 3 20m
BADEN TRAPEZOIDAL COMPUESTO
A2

20.00 m

L1=3.50 m L2=3.50 m L3=3.00 m L4=3.00 m L5=3.50 m L6=3.50 m

S1 = 5% S2 = 2.5% S = 5%
S = 2.5%
h1
z1 h2
z2 S3 = 0% S = 0%

A1

Caudal de diseño = 0.95 m3/seg


Cálculos:

L1= 3.50 m n= 0.023 para mamposteria de piedra


L'1= 3.5044 m
L2= 3.50 m
L'2= 3.5011 m
L3= 3.00 m
L4= 3.00 m
L5= 3.50 m A1= 2.8875 m2
L'5= 3.5011 m A2= 0.83125 m2
L6= 3.50 m
L'6= 3.5044 m
h1= 0.18 m
h2= 0.09 m
z1= 20.00 m
z2= 40.00 m
Slong(1)= 5.00%
Slong(2)= 2.50%
Stransversal= 2.50%

Empleando la formula de Manning

2/ 3 1 /2 A= 3.719 m2
A∗R ∗S
Q= P= 20.011 m
n R= 0.186 m

QBadénQ = 8.33 m3/seg CONFORME