Está en la página 1de 1
vere Fp rive of a “'s su Protection and Control 241 TABLE 5.5 (Continued) Coordination of Building Block Interfaces Interface. iteriae) — Number — Between And Coordination Needed at the Interface Location so VT FPL VT may benceded with FPI as reset mechanism when system voltage is restored VP will be needed if FPL is of the directional type GC Gi VT Applicable only i combined voltage and current sensors are proposed 7 cr Switch CT has to be physically located within the electrical parts of the switch, 18 VT Switch VT has to be physically located within the electrical pants of the switch 19. Switch __Drive Drive, of whatever type, i used to operate the switch hetween. the opened and closed states, early feasibility check is advised. TABLE 5.6 Example of Building Blocks Overhead Network Underground Network Without With Without With ‘Type of Switchgear Measurements Measurements Measurements Measurements Disconnector/ Yes Yes Yes Yes sectionalizing switch Disconnector/ Yes Yes No No seetionalizing switeh with Toca logic Citevit breaker Yes Yes Yes Yes Recloser Yes Yes No No way, the control building block with measurements can be used with a ground- mounted switch to form a sectionalizing switch with FPI and measurements for underground systems and with a pole-mounted switch to form a sectionalizing switch with FPI and measurements for overhead systems 5.21 TYPICAL INPUTS AND OUTPUTS FOR BUILDING BLOCKS 5.21.1 SECTIONAUIZING SwitcH (No MEASUREMENTS)

También podría gustarte