Val. N°2 Pavimento Moquegua
Val. N°2 Pavimento Moquegua
SUPERVISOR: : ING. PEDRO PAICO RUIZ DEPARTAMENTO : LIMA MONTO FINANCIADO : S/. 1,084,067.92
AVANCES
PRESUPUESTO SALDO
UND. ANTERIOR ACTUAL ACUMULADO PORC. PORC.
ITEM DESCRIPCION
MED. METRADO P. UNIT. PPTO METRADO VALORIZ METRADO VALORIZ METRADO VALORIZ % METRADO VALORIZ %
S/. S/. S/. S/. S/. S/.
01 OBRAS GENERALES
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA 7.20 X 3.60 m. und 0.67 992.48 S/. 664.96 0.67 664.96 0.00 0.00 0.67 664.96 100.00% 0.00 0.00 0.00%
01.01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb 0.67 3,570.19 S/. 2,392.03 0.34 1,196.01 0.00 0.00 0.34 1,196.01 50.00% 0.34 1,196.01 50.00%
01.01.03 ALQUILER DE OFICINA Y ALMACEN mes 3.00 500.00 S/. 1,500.00 1.00 500.00 1.00 500.00 2.00 1,000.00 66.67% 1.00 500.00 33.33%
01.02 SEGURIDAD Y SALUD
01.02.01 EQUIPAMIENTO DE PROTECCION INDIVIDUAL glb 0.67 2,979.00 S/. 1,995.93 0.67 1,995.93 0.00 0.00 0.67 1,995.93 100.00% 0.00 0.00 0.00%
01.02.02 SEÑ ALIZACION TEMPORAL DE SEGURIDAD glb 0.67 5,067.20 S/. 3,395.02 0.67 3,395.02 0.00 0.00 0.67 3,395.02 100.00% 0.00 0.00 0.00%
01.02.03 CAPACITACION DE SEGURIDAD Y SALUD glb 0.67 4,000.00 S/. 2,680.00 0.22 893.33 0.22 893.33 0.45 1,786.67 66.67% 0.22 893.33 33.33%
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y
01.02.04
SALUD DURANTE EL TRABAJO glb 0.67 2,080.00 S/. 1,393.60 0.22 464.53 0.22 464.53 0.45 929.07 66.67% 0.22 464.53 33.33%
02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 6,159.18 0.88 S/. 5,420.08 6,159.18 5,420.08 0.00 0.00 6,159.18 5,420.08 100.00% 0.00 0.00 0.00%
02.01.02 TRAZO Y REPLANTEO EN TERRENO CON EQUIPO TOPOGRAFICO m2 6,159.18 1.35 S/. 8,314.89 6,159.18 8,314.89 0.00 0.00 6,159.18 8,314.89 100.00% 0.00 0.00 0.00%
02.02.01 CORTE A NIVEL SUB - RASANTE EN MATERIAL SUELTO CON MAQUINARIA m3 515.08 4.85 S/. 2,498.14 396.57 1,923.36 118.51 574.77 515.08 2,498.14 100.00% 0.00 0.00 0.00%
02.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 359.98 16.89 S/. 6,080.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 359.98 6,080.06 100.00%
PERFILADO NIVELACION Y COMPACTACION EN LA SUBRASANTE DE LA
02.02.03
ZONA DE CORTE m2 6,159.18 2.86 S/. 17,615.25 0.00 0.00 6,159.18 17,615.25 6,159.18 17,615.25 100.00% 0.00 0.00 0.00%
02.02.04 SUB BASE GRANULA E=0.15 m m2 6,159.18 10.73 S/. 66,088.00 0.00 0.00 6,159.18 66,088.00 6,159.18 66,088.00 100.00% 0.00 0.00 0.00%
02.02.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 623.18 15.02 S/. 9,360.16 0.00 0.00 498.54 7,488.13 498.54 7,488.13 80.00% 124.64 1,872.03 20.00%
02.03 BASE GRANULAR
AVANCES
PRESUPUESTO SALDO
UND. ANTERIOR ACTUAL ACUMULADO PORC. PORC.
ITEM DESCRIPCION
MED. METRADO P. UNIT. PPTO METRADO VALORIZ METRADO VALORIZ METRADO VALORIZ % METRADO VALORIZ %
S/. S/. S/. S/. S/. S/.
02.03.01 BASE GRANULAR C/EQUIPO E = 0.20 m m2 6,159.18 11.11 S/. 68,428.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6,159.18 68,428.49 100.00%
02.04 PAVIMENTO RIGIDO
02.04.01 ENCOFRADO Y DESENCOFRADO PAVIMENTO RIGIDO m2 789.02 50.63 S/. 39,948.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 789.02 39,948.08 100.00%
02.04.02 CONCRETO PREMEZCLADO FC=280 KG/CM2 EN PAVIMENTO m3 1,231.84 454.68 S/. 560,093.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1,231.84 560,093.01 100.00%
02.04.03 CURADO DEL CONCRETO PAVIMENTO RIGIDO m2 6,159.18 1.13 S/. 6,959.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6,159.18 6,959.87 100.00%
02.04.04 JUNTAS DE CONSTRUCCION Y DILATACION e= 1" m 3,277.80 9.28 S/. 30,417.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3,277.80 30,417.98 100.00%
02.04.05 JUNTAS DE CONTRACCION e= 1" m 1,524.00 7.70 S/. 11,734.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1,524.00 11,734.80 100.00%
02.04.06 ACERO CORRUGADO 3/4" PARA PASADORES LONGITUDINALES kg 1,862.78 6.19 S/. 11,530.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1,862.78 11,530.61 100.00%
02.04.07 DOWELS TRANSVERSALES CON ACERO LISO DE 3/4" kg 4,096.51 9.88 S/. 40,473.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4,096.51 40,473.52 100.00%
02.05 SEÑALIZACION
02.05.01 PINTURA LINEAL EN BORDE DE PAVIMENTO m 1,310.59 5.30 S/. 6,946.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1,310.59 6,946.13 100.00%
02.05.02 PINTURA INTERM. DISCONT. CENTRO DE VIA m 381.00 4.88 S/. 1,859.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 381.00 1,859.28 100.00%
02.05.03 PINTURA EN CRUCE PEATOANAL m2 216.48 14.90 S/. 3,225.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 216.48 3,225.55 100.00%
02.05.04 PINTURA EN SIMBOLOS Y FLECHAS m2 28.80 16.44 S/. 473.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 28.80 473.47 100.00%
03 SANEAMIENITO
03.01.01 DEMOLICION DE BUZONES und 14.00 253.61 S/. 3,550.54 0.00 0.00 14.00 3,550.54 14.00 3,550.54 100.00% 0.00 0.00 0.00%
03.01.02 ELIMINACION DE DEMOLICION DE BUZONES m3 23.84 22.38 S/. 533.54 0.00 0.00 23.84 533.54 23.84 533.54 100.00% 0.00 0.00 0.00%
03.02 SISTEMA DE AGUA POTABLE
03.02.01.01 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m 165.00 1.22 S/. 201.30 70.00 85.40 95.00 115.90 165.00 201.30 100.00% 0.00 0.00 0.00%
03.02.01.02 LIMPIEZA DEL TERRENO MANUAL m 165.00 1.30 S/. 214.50 70.00 91.00 95.00 123.50 165.00 214.50 100.00% 0.00 0.00 0.00%
03.02.02 MOVIMIENTO DE TIERRAS
03.02.02.01 EXCAVACION DE ZANJA C. DOMICILIARIAS EN T.N. Hprom=1.00m m 165.00 17.68 S/. 2,917.20 70.00 1,237.60 95.00 1,679.60 165.00 2,917.20 100.00% 0.00 0.00 0.00%
03.02.02.02 REFINE Y NIVELACION DE ZANJA m 165.00 3.25 S/. 536.25 70.00 227.50 95.00 308.75 165.00 536.25 100.00% 0.00 0.00 0.00%
03.02.02.03 PREPARACION DE CAMA DE APOYO C/MATERIAL DE PRESTAMO m 165.00 5.76 S/. 950.40 70.00 403.20 95.00 547.20 165.00 950.40 100.00% 0.00 0.00 0.00%
03.02.02.05 SEGUNDO RELLENO COMPACTADO C/MATERIAL PROPIO m 165.00 4.70 S/. 775.50 70.00 329.00 95.00 446.50 165.00 775.50 100.00% 0.00 0.00 0.00%
03.02.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 47.52 22.38 S/. 1,063.50 20.16 451.18 27.36 612.32 47.52 1,063.50 100.00% 0.00 0.00 0.00%
03.02.03 CONEXIONES DOMICILIARIAS DE AGUA POTABLE
03.02.03.01 CONEXIONES DOMICILIARIAS DE 110MMX1/2 und 33.00 309.12 S/. 10,200.96 14.00 4,327.68 19.00 5,873.28 33.00 10,200.96 100.00% 0.00 0.00 0.00%
03.02.04 PRUEBA HIDRAULICA Y DESINFECCION
03.02.04.01 PRUEBA HIDRAULICA+DESINFECCION TUBERIA A ZANJA TAPADA m 165.00 2.93 S/. 483.45 0.00 0.00 165.00 483.45 165.00 483.45 100.00% 0.00 0.00 0.00%
03.03.01.01 EXCAVACION DE ZANJA EN T.N. PARA BUZON m3 74.61 16.40 S/. 1,223.60 0.00 0.00 74.61 1,223.60 74.61 1,223.60 100.00% 0.00 0.00 0.00%
03.03.01.02 ELIMINACION DE MATERIAL EXCEDENTE m3 89.53 22.38 S/. 2,003.68 0.00 0.00 89.53 2,003.68 89.53 2,003.68 100.00% 0.00 0.00 0.00%
AVANCES
PRESUPUESTO SALDO
UND. ANTERIOR ACTUAL ACUMULADO PORC. PORC.
ITEM DESCRIPCION
MED. METRADO P. UNIT. PPTO METRADO VALORIZ METRADO VALORIZ METRADO VALORIZ % METRADO VALORIZ %
S/. S/. S/. S/. S/. S/.
03.03.02 BUZONES
03.03.02.02 CONCRETO f'c=100 kg/cm2 E=4", PARA SOLADO m2 28.14 42.05 S/. 1,183.29 0.00 0.00 28.14 1,183.29 28.14 1,183.29 100.00% 0.00 0.00 0.00%
03.03.02.03 BUZON TIPO I; h=1.00m-2.50m und 13.00 2,132.45 S/. 27,721.85 0.00 0.00 13.00 27,721.85 13.00 27,721.85 100.00% 0.00 0.00 0.00%
03.03.02.04 BUZON TIPO I; h=2.51m-3.60m und 1.00 3,583.67 S/. 3,583.67 0.00 0.00 1.00 3,583.67 1.00 3,583.67 100.00% 0.00 0.00 0.00%
03.03.02.05 DADOS DE CONCRETO f'c=140 kg/cm2 m3 2.69 319.69 S/. 859.97 0.00 0.00 2.69 859.97 2.69 859.97 100.00% 0.00 0.00 0.00%
03.03.03 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO
03.03.03.01.01 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m 192.50 1.22 S/. 234.85 82.50 100.65 110.00 134.20 192.50 234.85 100.00% 0.00 0.00 0.00%
03.03.03.02 MOVIMIENTO DE TIERRAS
03.03.03.02.01 EXCAVACION DE ZANJA C. DOMICILIARIAS EN T.N. Hprom=1.00m m 192.50 17.68 S/. 3,403.40 82.50 1,458.60 110.00 1,944.80 192.50 3,403.40 100.00% 0.00 0.00 0.00%
03.03.03.02.02 REFINE Y NIVELACION DE ZANJA m 192.50 3.25 S/. 625.63 82.50 268.13 110.00 357.50 192.50 625.63 100.00% 0.00 0.00 0.00%
03.03.03.02.03 PREPARACION DE CAMA DE APOYO C/MATERIAL DE PRESTAMO m 192.50 5.76 S/. 1,108.80 82.50 475.20 110.00 633.60 192.50 1,108.80 100.00% 0.00 0.00 0.00%
PRIMER RELLENO COMPACTADO C/MATERIAL DE PRESTAMO a=0.60m,
03.03.03.02.04
H=0.30 m SOBRE LA CLAVE DE TUB.. m 192.50 13.30 S/. 2,560.25 82.50 1,097.25 110.00 1,463.00 192.50 2,560.25 100.00% 0.00 0.00 0.00%
03.03.03.02.05 SEGUNDO RELLENO COMPACTADO C/MATERIAL PROPIO A=0.60M m 192.50 3.00 S/. 577.50 82.50 247.50 110.00 330.00 192.50 577.50 100.00% 0.00 0.00 0.00%
03.03.03.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 77.62 22.38 S/. 1,737.14 33.26 744.36 44.36 992.78 77.62 1,737.14 100.00% 0.00 0.00 0.00%
03.03.03.03 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO
03.03.03.03.01 CONEXIONES DOMICILIARIAS DE 200MMX160MM und 35.00 553.68 S/. 19,378.80 15.00 8,305.20 20.00 11,073.60 35.00 19,378.80 100.00% 0.00 0.00 0.00%
PROGRAMAD
PROGRAMADO PROGRAMADO
O DEL 01 DE PROGRAMAD
PORCENTAJE PROGRAMADO DEL 09 AL 31 19.00% DEL 01 AL 31 DE 51.00% FEB. AL 07 DE
30.00% O TOTAL 70.00%
DIC. 2019: ENE. 2020
MAZ. 2020
MES : January-20
MONTO TOTAL VALORIZADO