Documentos de Académico
Documentos de Profesional
Documentos de Cultura
INGENIERIA MODIFICACIÓN
A R A R SI (Yes) NO (No)
X
1 19.250" TOL + / - 0.046" 19.247", 19.250", 19.255"
X
2 9.625" LH TOL + / - 0.046" 9.630", 9.635", 9.635"
X
9.625" RH TOL + / - 0.046" 9.635", 9.630", 9.630"
X
3 9.312" LH TOL + / - 0.046" 9.310", 9.311", 9.315"
X
9.312" RH TOL + / - 0.046" 9.320", 9.315", 9.315"
X
4 3.656 (1) TOL + / - 0.046" 3.650", 3.655", 3.650"
X
3.656 (2) TOL + / - 0.046" 3.650", 3.655", 3.658"
X
3.656 (3) TOL + / - 0.046" 3.650", 3.658", 3.660"
X
3.656 (4) TOL + / - 0.046" 3.660", 3.650", 3.655"
X
5 4.5" LH TOL + / - 0.023" 4.500", 4.485", 4.490"
X
4.5" RH TOL + / - 0.023" 4.495", 4.495", 4.490"
X
6 9.000" LH TOL + / - 0.046" 9.005", 9.010", 9.005"
X
9.000" RH TOL + / - 0.046" 9.015", 9.020", 9.020"
X
7 R0.953 (1) TOL + / - 0.032" 0.950", 0.951", 0.950"
X
R0.953 (2) TOL + / - 0.032" 0.952", 0.950", 0.952"
X
R0.953 (3) TOL + / - 0.032" 0.951", 0.952", 0.953"
X
R0.953 (4) TOL + / - 0.032" 0.950" 0.950", 0.955"
X
8 R78.312" LH TOL + / - 0.032" 78.310", 78.310", 78.315"
X
R78.312" RH TOL + / - 0.032" 78.315", 78.315", 78.320"
X
9 5.000" LH TOL + / - 0.046" 5.005", 5.010", 5.005"
X
5.000" RH TOL + / - 0.046" 5.015", 4.995", 4.995"
X
10 2.500" LH TOL + / - 0.023" 2.500", 2.505", 2.495"
X
2.500" RH TOL + / - 0.023" 2.489", 2.495", 2.495"
X
11 1.375" TOL + / - 0.046" 1.375", 1.380", 1.380"
R: RECHAZADO (Rejected )
REVISADO EN KOBLENZ POR: (Reviewed in Koblenz by) PUESTO: (Position) FECHA: (Date)
HOJA (Sheet No) DE (of) .
NOTAS: (Notes)
1. CUANDO SE TRATE DE VARIAS CAVIDADES DE LA MISMA PARTE SE DEBERA ELABORAR UN REPORTE DE EVALUACION DE MUESTRAS POR CADA CAVIDAD. (If there are several cavities of the same part, there should be a report per cavity)
2. PARA UNA APROBACION INICIAL DE UNA MUESTRA SE DEBEN DE REPORTAR TODAS LAS DIMENSIONES, NOTAS Y ESPECIFICACIONES DEL DIBUJO (For an initial approval, a full dimensional report should be done including dimensions, notes, and specification from the drawing) F-DT-GE-018/2