DATOS OBTENIDOS PARA CURVA GRANULOMETRICA PROFUNDIDAD 30 CM

PESO PORCENTAJE
ABERTURA PORCENTAJE
TAMIZ RETENIDO RETENIDO
(mm) RETENIDO (%)
(gr) ACUMULADO (%)
3/8" 9.520 3.6 0.62 0.62
4 4.750 8.5 1.46 2.08
8 2.360 22.9 3.94 6.03
16 1.100 18.1 3.12 9.14
30 0.600 9.9 1.70 10.85
50 0.300 19 3.27 14.12
100 0.150 65 11.19 25.31
200 0.075 112.5 19.37 44.68
filler 321.3 55.32 100.00
TOTAL 580.8 100.00

GRANULOMETRIA DE SUELO A
30CM
120

100

80

60
% pasa

40

20

0
10.00 1.00 0.10 0.01

abertura del tamiz (mM)

DATOS OBTENIDOS PARA CURVA GRANULOMETRICA PROFUNDIDAD 90 CM

PESO PORCENTAJE
ABERTURA PORCENTAJE
TAMIZ RETENIDO RETENIDO
(mm) RETENIDO (%)
(gr) ACUMULADO (%)
3/8" 9.520 0 0.00 0.00
4 4.750 2.4 0.42 0.42
8 2.360 3.5 0.62 1.04
16 1.100 2.1 0.37 1.41
30 0.600 2.0 0.35 1.77
50 0.300 6.0 1.06 2.83
100 0.150 24.7 4.36 7.19
200 0.075 0.02 0.00 7.20
filler 525.18 92.80 100.00
TOTAL 565.9 100.00

GRANULOMETRIA DE SUELO A 90
CM
120

100

80

60
% PASA

40

20

0
10.00 1.00 0.10 0.01

abertura del tamiz (mM)


OFUNDIDAD 30 CM DATOS OBTENIDOS PARA CURVA GRANULOMETRICA PROFUNDIDAD 6

PORCENTAJE ABERTURA PESO PORCENTAJE


TAMIZ
PASA (%) (mm) RETENIDO (gr) RETENIDO (%)

99.38 3/8" 9.520 4.1 0.77


97.92 4 4.750 30.9 5.78
93.97 8 2.360 25.5 4.77
90.86 16 1.100 13.9 2.60
89.15 30 0.600 5.5 1.03
85.88 50 0.300 10.1 1.89
74.69 100 0.150 23.5 4.40
55.32 200 0.075 0.2 0.04
filler 420.8 78.73
TOTAL 534.5 100.00

ELO A GRANULOMETRIA DE SUELO A


60CM
120

100

80

60
% PASA

40

20

0
0.01
10.00 1.00 0.10

abertura del tamiz (mM)

OFUNDIDAD 90 CM DATOS OBTENIDOS PARA CURVA GRANULOMETRICA PROFUNDIDAD 12

PORCENTAJE ABERTURA PESO PORCENTAJE


TAMIZ
PASA (%) (mm) RETENIDO (gr) RETENIDO (%)

100.00 3/8" 9.520 9.7 1.81


99.58 4 4.750 30.7 5.72
98.96 8 2.360 27.1 5.05
98.59 16 1.100 14.5 2.70
98.23 30 0.600 11.8 2.20
97.17 50 0.300 26.8 4.99
92.81 100 0.150 49.4 9.21
92.80 200 0.075 0.2 0.04
filler 366.4 68.28
TOTAL 536.6 100.00

LO A 90 GRANULOMETRIA DE SUELO A
120CM
120

100

80

60
% PASA

40

20

0
0.01 10.00 1.00 0.10

abertura del tamiz (mM)


NULOMETRICA PROFUNDIDAD 60 CM

PORCENTAJE
PORCENTAJE
RETENIDO
PASA (%)
ACUMULADO (%)
0.77 99.23
6.55 93.45
11.32 88.68
13.92 86.08
14.95 85.05
16.84 83.16
21.23 78.77
21.27 78.73
100.00

A DE SUELO A
M

0.10 0.01

z (mM)

ULOMETRICA PROFUNDIDAD 120 CM

PORCENTAJE
PORCENTAJE
RETENIDO
PASA (%)
ACUMULADO (%)
1.81 98.19
7.53 92.47
12.58 87.42
15.28 84.72
17.48 82.52
22.47 77.53
31.68 68.32
31.72 68.28
100.00

A DE SUELO A
M

0.10 0.01

(mM)

También podría gustarte