Está en la página 1de 1

SELLOS

5 7 9 11 13

C S.S.
3.8 m²
N.P.T. = 0 +765.10
Bod. Bod.
TI 7.0 m² 7.0 m²
Escaner N.P.T. = 0 +765.10 22

Ø2"
TI N.P.T. = 0 +765.10
C.Elec. N.P.T. = 0 +765.10

PVC Ø2"
Servidores Bodega 18.1 m² S.S. S.S. 2"
TI

Ø
Ø

2"
N.P.T. = 0 +765.10 2.6 m² 4.7 m² C
8.7 m² 9.5 m² N.P.T. = 0 +765.10 P V
N.P.T. = 0 +765.10 SV N.P.T. = 0 +765.10 PVC Ø2" 21

Ø2" PVC Ø3"


I
N.P.T. = 0 +765.10 N.P.T. = 0 +765.10 TUBERÍA PVC Ø3" TUBERÍA PVC Ø3" SV
PS 23 20
5
Ø2" 12
2" 19

PVC Ø2"
TUBERÍA PVC Ø3"
SV SV
Ø
N.P.T. = 0 +765.10 C 18
TUBERÍA PVC Ø2" SV PV
PVC Ø2"

Aduana 17

PVC Ø2"
PV
Revisión física Bodega TI S.S. 3"
PV

C
Ø TUBERIA PVC Ø3"125 PSI S=1% TUBERIA PVC Ø3"125 PSI S=1% PVC Ø3" 16

Ø
C

64.5 m²

2"

PV
Ø

20.0 m² 24.2 m² 2.1 m² N.P.T. = 0 +765.10 S 15


2"

C
PVC Ø2" TUBERIA PVC Ø2"125 PSI S=1% TUBERIA PVC Ø3"125 PSI S=1%

Ø
N.P.T. = 0 +765.10

2"
N.P.T. = 0 +765.10 1 +765.27 14

PVC Ø3"125 PSI S=1%


N.P.T. = 0 +765.10 PVC Ø2" 2 +765.45 13
3 +765.62 12

PV
C
4 +765.80 11

Ø
Oficina de atención TI

2"
Inv. Disc. N.P.T. = 0 +765.10 S.S. 5 +765.97 10 Agente canino
Jefe PNC ciudadana Est. 6 +766.14
9.8 m² 19.6 m² 5.9 m² 5.9 m² CCG #1 C. Limpieza N.P.T. = 0 +765.10 9 11.0 m²
NT=764.75 7 +766.32 +766.32
NF=764.25 3.9 m²
N.P.T. = 0 +765.10 N.P.T. = 0 +765.10 N.P.T. = 0 +765.10 N.P.T. = 0 +765.10 H=0.50

SV
D Ø
6" BAG Ø6" 8
C
PV

CCG #7
CCG #2 CCG #3 CCG #4
TUBERIA PVC Ø6" S=1% TUBERIA PVC Ø6" S=1% NT=764.05
NT=764.70 NT=764.64 NT=764.46
flexible de doble pared según ASTM F-949-a, flexible de doble pared según ASTM F-949-a, NF=763.54
NF=764.20 NF=764.14 NF=763.96
rigidez anular en 46 psi, con junta rigidez anular en 46 psi, con junta HACIA TRAMPA DE H=0.50
H=0.50 H=0.50 H=0.50
TUBERIA PVC Ø6" S=1% elastomérica según ASTM F-949-a elastomérica según ASTM F-949-a GRASAS

TUBERIA PVC Ø3" S=1%

2"

2"

2"

2"

2"
Ø2"
TUBERIA PVC Ø3" S=1%

Ø
E PVC Ø3" S=1% PROYECTO:
TUBERIA DE PVC Ø3' 23 22 21 20 19 18 17 16 15 PVPVC Ø2" S=1%

PV
SV
Cuarto de Limpieza C
Ø DISEÑO MÁS CONSTRUCCIÓN DEL PROYECTO DE MODERNIZACIÓN

C
PVC Ø3" 2"

Ø
BAG Ø6''
INTEGRAL DEL PUESTO FRONTERIZO ANGUIATÚ

2"
S=
CCG #1 4.7 m² 2'

S=
TUBERIA PVC Ø2" Ø 1%
LOTE 1: SEDE ANGUIATU

1%
NT=764.75 14 C
S=4.6% PV

PVC Ø2"
NF=764.25 TI

1%
SV

S=1%
H=0.50 13
S.S. Mujeres S.S. Hombres

TUBERIA PVC Ø3" S=1%

S=
2"
12

Ø
20.1 m² 17.3 m²

C
TU
PLANO DE DISEÑO ACTUALIZADO A FECHA: OCTUBRE 2021

PV
11
N.P.T. = 0 +765.10 BE N.P.T. = 0 +765.10 N.P.T. = 0 +765.10
+766.84 Colecturía R MAG OIRSA DAN TI Ø2" TI
TI
TUBERIA DE PVC Ø3'

10 IA
PV

S=
11.9 m² 12.0 m² 12.0 m² 8.6 m²
+765.27
+765.45
+765.62
+765.80
+765.97
+766.14
+766.32
+766.49
+766.67

4.
6%
Ø
2"
N.P.T. = 0 +765.10 N.P.T. = 0 +765.10 N.P.T. = 0 +765.10 N.P.T. = 0 +765.10 P R E S E N T A: E S Q U E M A D E U B I C A C I Ó N:
S

TUBERIA DE PVC Ø2'


1 2 3 4 5 6 7 8 9

TUBERIA PVC Ø2" SV SV N


S=1%

TUBERIA DE PVC Ø2'


TUBERIA PVC Ø2" S=1%

TUBERIA PVC Ø2" S=1%


22

TUBERIA PVC
Ø2" S=1%
TUBERIA PVC Ø2" S=1%

PVC Ø2'

TUBERIA PVC
N.P.T. = 0 +765.10 N.P.T. = 0 +765.10

Ø2" S=1%
Con junta cementada en 125 psi (SDR
SUPERVISA:
Atención a público

32.5) según ASTM D-2241


TUBERIA PVC Ø2" S=1%
TUBERIA DE PVC Ø3' TUBERIA DE PVC Ø3' PV TUBERIA DE PVC Ø3' S 21

55.2 m² C
SV Ø 1 +765.28 20
2"
Bodega 2 +765.46 19

Ø2"
TUBERIA DE PVC Ø2'
N.P.T. = 0 +765.10

PVC Ø2'
PVC Ø2'
TI Cuarentena 4.8 m² TI
3 +765.65 18

6.8 m² S.S. TI S.S. 4 +765.83 17


N.P.T. = 0 +765.80 5 +766.01 16 F U E N T E D E F I N A N C I A M I E N T O: P R O P I E T A R I O:
N.P.T. = 0 +765.10 N.P.T. = 0 +765.10
6 +766.19 15

SV PV Sala de 7 +766.37 14

2"
C
reuniones

Ø
Ø
2"
8 +766.55 13

Oficiales Enfermería Aislados S.S. Bodega 15.0 m² 9 +766.74 12


TI

Ø2"
10 +766.92 +766.92
6.7 m² 8.2 m² 8.2 m² 2.8 m² N.P.T. = 0 +765.10
TI
N.P.T. = 0 +765.10 N.P.T. = 0 +765.10 N.P.T. = 0 +765.10 N.P.T. = 0 +765.10 N.P.T. = 0 +765.10 N.P.T. = 0 +765.80 N.P.T. = 0 +765.80 N.P.T. = 0 +765.10 D I S E Ñ O A R Q U I T E C T Ó N I C O: D I S E Ñ O E S T R U C T U R A L:
11
ARQ. GUILLERMO ALTAMIRANO
F

PLANTA DE INSTALACIONES DE AGUAS GRISES Y VENTEO


PRIMER NIVEL S I M B O L O G I A
D I S E Ñ O E L É C T R I C O: D I S E Ñ O H I D R Á U L I C O:
ESCALA 1:75
TUBERIA DE AGUAS GRISES

YEE

DESCARGA AGUAS GRISES FECHA: REFERENCIA: ÁREA DE TERRENO:


OCTUBRE 2021 8,515.11 m² - 12,185.12 v²
SIFON
ESCALA: ÁREA DE CONSTRUCCIÓN:
INDICADAS 8,734.84 m² - 12,499.56 v²
CAJA CIEGA DE AGUAS GRISES
NOTAS DE PLANO TALLER: C O N T E N I D O:
- RED DE VENTEO NUEVA INTEGRADA, PLANOS DE DISEÑO ORIGINALES SIN RED DE VENTEO EN TEE PVC PARA VENTEO PLANTA DE INSTALACIONES DE
PRIMER NIVEL DE LOS EDIFICIOS, GENERADA A PARTIR DE INTERFERENCIAS EN PLANOS DE
INTEGRACION, REDES DE AN Y AG Y OBSERVACIONES EN CAMPO AGUAS GRISES Y VENTEO
- LA DISTRIBUCION DE RED DE AGUA GRISES SE ACTUALIZO SEGÚN LOS CAMBIOS REALIZADOS
EN CAMPO Y ARTEFACTOS PENDIENTES DE CONEXION A LA RED.
NIVEL 1
- LAS SUBIDAS DE VENTEO FUERON ADECUADAS SEGUN PREVISIONES VISTOS EN PLANOS
TALLER Y OBSERVACIONES EN CAMPO E INTERFERENCIAS DE PLANOS DE INTEGRACION TAPON RESUMIDERO
- BAJADA DE LAVADERO DE COCINA POR INTERFERENCIA CON VIGA ESTRUCTURAL - CONEXION TI
A CAJA DE BAN
- PENDIENTE INTEGRACION DE DRENAJES DE EQUIPOS DE AIRE ACONCIONADO, FALTA DE TUBERIA DE VENTEO
APROBACION DE PLANOS TALLER
CONTRATO: FOM II-CB-2358-A/2019 HOJA No:
DISEÑO MÁS CONSTRUCCIÓN DEL PROYECTO DE MODERNIZACIÓN INTEGRAL
DEL PUESTO FRONTERIZO ANGUIATÚ LOTE 1: SEDE ANGUIATU
IH-15
REV: 003

También podría gustarte