Está en la página 1de 1

A B

5.00
1.50 2.00 1.50
Ø 3/8 2@ .05, 10@ .10,r@0.15 dc/e

0.23
0.25 1.25 1.38 0.62 1.25 0.25
b

VIGA Sobrecimiento corrido


3 3 Junta 1/2"Poliestireno 1:8+25% PM
0.45

0.45

VC 25X35 contrapiso NPT+0.25 m


falsopiso
b
1.50

1.50

afirmado
1.05

1.05

NFZ:-1.50
NFZ:-1.50
Z1 Z1
Cimiento corrido
1:10+30% PG
0.4
a a
a a a a terreno natural .40
4.75

4.75

CORTE a-a
2.40

2.40

2.40

2.40

COLUMNA

ESC:1/50
1.70 1.60 1.70
0.13
Z2 Z2
0.63

0.63

SOBRECIMIENTOS
2 2
0.45
1.70

1.70

1.70

VC 25X35 C:H 1:8+25%PM


Ø 3/8 2@ .05, 10@ .10,r@0.15 dc/e
1.08
0.63

a a
NPT. +0.00 MATERIAL DE
a a NPT. -0.10 AFIRMADO

.40
CIMIENTO
NPT. -0.20 1:10+30%(PG)
a a
2.90

2.90

2.90

2.90

MATERIAL PROPIO
SELECCIONADO
5.25

5.25

PARA RELLENO
N.F.C.-0.50
.30
1.50 2.00 1.50
CORTE b-b
ZAPATA ESC:1/50
1.50

Z1 Z1
1.05

1.05
1.50

1.50

DETALLE DE CIMIENTO-SOBRECIEMIENTO
b

ESC: 1/25
0.45

0.45

VC 25X35
1 1
b

DETALLE COLUMNA -ZAPATA


0.25 1.25 1.55 0.45 1.25 0.25
ESC: 1/25
1.50 2.00 1.50
5.00
A B
PLANO DE CIMENTACION
ESC. 1/50 CUADRO DE ZAPATA
Z1 Z2
fć INGENIERIA
CONSTRUCCIONES
CUADRO DE CIMENTACION
VIVIENDA UNIFAMILIAR
NOMBRE DEL PROYECTO:
PROPIETARIO:
ARACELY V. SULCA MACHACA
PLANO:
CIMENTACION
LAMINA:
DEPARTAMENTO: AYACUCHO LUGAR : YANAMA
PROVINCIA : HUAMANGA Jr. : Gnral. Edwin donayre
MZ : J1
E-1
DISTRITO : CARMEN ALTO
ESPECIALISTA: LOTE : 13A-1
FREDY C.O.
ESPECIALIDAD:
ESTRUCTURAS
ESCALA: FECHA: 14/02/2021
INDICADA

También podría gustarte