7.2.- ANALISIS DE GASTOS
GENERALESi castos Genenas ru0s 3
vnc"
baa)
5.00
998.00
[PS RUCCION be A CARRETERA VEEL BELA BELLA ESA RO TRE LAN SANTOS ATARLALPA DEL DSTO MARANDDAMASO BERL PROIIC DE LEOATIO PAO
DURAGION DE LA OBRA (MESES)
‘COSTO DIRECTO (NUEVOS SOLES)
__ GASTOS OMINTSTRATVOS
“(0] — ease dete» Eubatn de Ramos a = ae oD 20
"Loe fase ages (ee et 00 Tot 0.0
103 — sb Vas a ‘et 109 35000 0.00
“TOTALDE GASTOS AOMINSTERTIOS 0.00
Z.00_—LOUIDAGION DE OBRA CT)
201 Ingen Reve = =| 18] | ae |
202 — lee de Oicra pris Pilea y orb) mms 05] a0 “ts 00 75000
208 Diu ei 05 | a0 | st. 00 09
Fags de Bae
‘apo Fae (1 aR | a, Tea aH
{SSALUD (98 FU Apr Erg] a 10] 11 5.0 5.0
Sequeira cy 9 [ 0 80 15.00
‘S.CT (618? Ut e¥-AerseEngd sb 1.0100 8 2611
‘STAG S74 Ut pa Empat ca 10/100 To. Teo.
CIS 6.558 F unk cs 1010 castor “S107
Varies (12 (Pt Tay Fan oo 0] 100 SE 8
(fs (V8 Pent 2). a tot T1325 7325
Zot Freep Pros = Ta, a5 OH Eo
[206 Feber Oosmaros a 19140" 160.0 00
206 mpsebée,Endenalo bon et io 10 150.00 71300
207 — [arustosooes ‘st to] 100 00 20.0
2.8 boviasan captains ‘st io] 1a 0.0 ‘00,
2.8 lose dfs ‘st 10] 10 28 3238]
“OTAL DE GASTOS DE UGUDAGON aawssr
[CONSTRUCCION DE CARRETERA VECINAL BELLA - BELLA ALTA RIO TIGRE - JUAN SANTOS ATAMUALPA DEL DISTRITO MARIANO
DAMASO BERI
‘COBEN REGIONAL
lesreoausra ex contnaTos DE 038A
SSSTENTE AOMINUSTRATIVO
LIGACIONES EL EUPLEADOR
[REGEN De PRESTAGONES DE SALUD
[GRATACACGN ESPECAUSTA EN CONTRATOS DE OGRA
ATFEACON ASISTENTE ACMNSTRATWO
[pareLenia, MOUARIOY UMLES DE ES
vPLEWENTAGION De SEGURIDAD
feascuna o reTROWED
Isenvicios DIvERsos
ob de opel warn
Fn
erry
[sone
PROVINCIA DE LEONGIO PRADO - HUANUCO.
Pine oo Feat
‘Antonio Vi
INGENTERO CIV,
fain Pezo
Reg, CIP. N? 79023,
TOO ais ealraaosl¢e|
Man up wavs
‘RO STE
ao oO}
‘oa wa)
San aoe aE SOT
vege 9
say a8 I
me mas oT
aoe to: [wor ——|-a
pots pot [or zs
aT rT =
tig or =
rae.
ome ae Cn
[so ter i
to om
tot |
ca a
a0 oq
Toa O19 WHOL
ar wey ove
ctw os00
(a YSN
LW vay Tao MESH M30 NOCENAC
sre sae SLs |7.10.- ANALISIS DE
MOVILIZACION DE
EQUIPOS LIVIANOJoIz
4635
ANAUISIS DE y Des \CION DE: NO (TINGO MARIA
"CONSTRUCCION DE CARRETERA VECINAL BELLA BELLA ALTA RIO GRE JUAN SANTOS ATAMUALPA DEL OISTRTO
ORAS "MARIANO DAMASO BERAUN, PROVINCIA DE LEONCIO PRADO - HUANUCO™
UBICACION: GP. BELLA- MARIANO DAMASO BERAUN -LEONCIO PRADO -HUANUCO
FECHA: ‘SETEMBRE DEL 2021,
Le JOTALEN.
me DESCRIFCION DEL INSUMO UND
T :STACION TOTAL INGAMIRAS Y JALONES ‘und _[
FALADRO ELEGTRIGO ‘nd 1
= IEZCLADORA DE CONCRETO DE Tips 78HP nd T Tsa0.05 | 150000 —}
4 MoTOBOMBA 12 HP & wa z “8500 | — 17000,
[EQUIPO DE CORTE ¥ SOLOED. ne u 7500)
é DORA net T T0300" Toco
7 IMOTOSOLDADORA DE 250A ‘ne T < 0
= [COMPRESORA NEUMATICA TO6 HP 200 POU ‘und T ET OT
7 [COMPACTADOR VIBRATORIO TIPO PLANCHA SBP ‘nd T 75.00 95.00
6 BRADOR DE CONCRETO 4 HP 1.50" ‘und T B00 B.
1) JeafOn MULTIMEDIA od T 7000, 000
12 JNARTILLG NEUVATICO BE 25g ‘und 1-00 75007
13___NWVEL TOPOGRAFICO WCAIRASY IALONES une T TODO, Toco
de ‘CALCUL DEL COSIO UNTARIOXKG,
CCAPACIDAD DEL CAMION (KG) 15000
(COSTO POR HM INCLLIDO OPERACION ¥ MANTENIMIETO (5) 250
TEMPO DE TRANSPORTE [DA ¥ VUELTA) EN HORAS 8
‘COSTO DE TRANSPORTE FOR VIALE (S/) 400
‘COSTO DETRANSPORTE POR KG (5,1
‘CALCULO DE LA MOVIIZACION ¥ DESMOVILZACION
‘COSTO DE TRANSPORIEFORKG (51) 339]
PESO TOTAL DE LOS MATERALES Y HERRAMIENTAS KG) wR
‘COSTO TOTAL DEL TRANSPORTE (5/.) 2097.90]
‘SE CONSIDERA EL COSTO POR DOS VIALES coniey $/.9,000.00
SINIGV
[NOTA \A MOVLUACIONY DESMOILGACION SE REAIZAN EN DIFERENTES FECAS POR OTTO SE CONSIDERA DOS VAIS
INGENIERO CIVIL
Reg. C1P.N* 79023,7.11.- ANALISIS DE
MOVILIZACION DE
EQUIPOS PESADOonea:
Joi
ar
ANALISIS DE MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO (TINGO MARIA - C. P. BELLA)
"CONSRUCCION DE CARRETERA VECINAL BELA - BELLA ALTAR} TIGRE- JUAN SANTOS ATAMUALPA DEL DSTRTO MARIANO DAMASO
BERAUN, PROVINCIA DELEONCIO PRADO - HUANUCO™
UBICACIONE CP, BELLA-MARIANO DAMASO BERAUN -LEONCIO PRADO - WIANUCO
FecHa:
SETIEMBRE DE. 2021
ke CALCULO DEL COSTO DE HM FOR MOVIUZACION Y DESMOVIUZACION
Ta costo onan
oo bescnres6u oe rauro wore | actu cae | PeMoN
1 [SAINGN GISTERNA 4X (AGUA) 22 HP 2.00091 mw | aa | 078 Taal
2___|CAMION VOLGUETE 634, 20 HP fom vin | e000 [07s rasa
3_JRODILLO 1180 AUTOPROPULSADO MODELO GATE: Tor HG] wa | 000] 075 a
2 JRETROEXCAVADORA 225 HP vox | oun —[ 07s a
5 [TRACTOR SOBRE ORUGAS NODELO D7.6-2207 a 100
4 |CARGADOR FRONTAL NODELO GAT. a80 -POTENGIA WOH] ww | —im.00 | are va]
7 JMOTONVELADORA WODELO 1206 DE TBE HP ws | 009 | ars va
JOAN 4x2 20 HP 2 ton vs | —ap00 | 07s Ex]
TNTHTA MOVING YDSO SRE BBE ECTS PORTO TANS 9 CONSTERA OOS VES
te (CALCULO DEL COSTO POR MOVILIZACIGN Y DESMOVIUZACION