DATOS NECESARIOS PARA EL CALCULO DE FLETES
FLETE CON VEHICULO FLETE CON ACEMILA Y PEON
INSUMOS
ORIGEN - DESTINO Prec. U. ORIGEN - DESTINO
MATERIALES HUAMACHUCO - PC 0.10 PC - OBRA
AGREGADOS 0.00 PC - OBRA
TUBERIAS 0.00
3905
1247
1006
RELACION DE INSUMOS BASE
1235 55
74 SOLO TUBERIA
Peso
Long. Ø ext.
Cod. IU Tipo Insumo Und Soles unitario
(m) (mm)
(kg)
1001 47 MO OPERARIO HH 19.53 0 0 0
1002 47 MO OFICIAL HH 16.05 0 0 0
1003 47 MO PEON HH 14.44 0 0 0
1004 47 MO TOPÓGRAFO HH 15 0 0 0
1005 47 MO OPERADOR DE EQUIPO LIVIANO HH 8.75 0 0 0
1180 37 BS INSUMO QUE DEPENDE DEL % MO %MO
1201 2 MA CLAVOS PARA CALAMINA KG 9.2 1 0 0
1202 2 MA CLAVOS PARA MADERA DE 3" KG 4.72 1 0 0
1203 43 MA MADERA DE EUCALIPTO 4"X3M PARA PAR UND 18.88 8 0 0
1204 43 MA MADERA DE AUCALIPTO 4" X 5M PARA VIGUND 23.6 12 0 0
1205 56 MA CALAMINA DE 183CM X 83CM X 0.22MM PZA 21.24 3 0 0
1206 2 MA CANDADO MEDIANO UND 6.73 0.25 0 0
1207 43 BS MOBILIARIO PARA OFICINA GBL 118 25 0 0
1208 44 MA TRIPLAY E=4MM PZA 30.68 6 0 0
1209 2 MA BISAGRA DE 4"X4" UND 8.38 0.5 0 0
1210 2 MA CLAVOS PARA MADERA DE 4" KG 4.72 1 0 0
1211 2 MA CLAVOS PARA MADERA DE 1" KG 7.08 1 0 0
1212 43 MA MADERA DE EUCALIPTO 3" X 4M PARA VI UND 18.88 8 0 0
1213 43 MA MADERA DE AUCALIPTO 4" X 5M PARA CA UND 23.6 12 0 0
1214 39 BS GIGANTOGRAFIA DE 2.40M X 3.60M CON UND 354 0 0 0
1215 32 BS MOVILIZACION Y DESMOVILIZACION DE E GBL 1416 0 0 0
1216 55 MA PINTURA ESMALTE SINTETICO GLN 41.3 4 0 0
1217 43 MA ESTACA DE MADERA UND 0.24 0.2 0 0
1218 2 MA ALAMBRE NEGRO # 16 KG 4.72 1 0 0
1219 2 MA CLAVOS PARA MADERA DE 2" KG 4.72 1 0 0
1220 53 MA PETROLEO GLN 17.7 4 0 0
1221 43 MA MADERA TORNILLO PARA ENCOFRADO P2 5.66 1.6 0 0
1222 21 MA CEMENTO PORTLAND TIPO I (42.5KG) BLS 23 42.5 0 0
1223 4 MA HORMIGON M3 82.6 1650 0 0
1224 34 MA GASOLINA DE 90 OCTANOS GLN 18.88 3.5 0 0
1225 4 MA ARENA GRUESA M3 94.4 1680 0 0
1226 13 MA ASFALTO RC-250 GLN 17.7 3.8 0 0
1227 21 MA YESO EN BOLSA DE 5KG BL 7.08 5 0 0
1228 2 MA ALAMBRE NEGRO # 8 KG 4.72 1 0 0
1229 3 MA ACERO DE REFUERZO FY=4200 KG 3.43 1 0 0
1230 4 MA ARENA FINA M3 123.9 1720 0 0
1231 43 MA REGLA DE MADERA P2 5.9 2 0 0
1232 39 MA IMPERMEABILIZANTE GLN 21.24 4 0 0
1234 32 BS FLETE TERRESTRE GBL 34195.97 0 0 0
1235 47 BS FLETE RURAL GBL 57015.53 0 0 0
1236 SP CONCRETO F'C=175 KG/CM2 PARA CANAL m3 521.02
1237 5 MA PIEDRA MEDIANA M3 36.52 0 0 0
3900 37 HE HERRAMIENTAS MANUALES %MO 192.75
3901 48 EQ MIRA TOPOGRÁFICA HM 4.72 0 0 0
3902 49 EQ NIVEL TOPOGRAFICO HM 8.26 0 0 0
3903 49 EQ MEZCLADORA DE CONCRETO 9-11 P3 HM 29.5 0 0 0
3904 49 EQ VIBRADORA DE CONCRETO HM 19 0 0 0
1238 43 MA Electrodo UND 23.6 12 0 0
3905 49 EQ ESTACION TOTAL HM 17.7 0 0 0
1240 49 BS GPS DIFERENCIAL UND 141600 0 0 0
1241 39 BS CAPACITADOR-ING.CIVIL GBL 708 0 0 0
1242 49 BS CELULAR DIA 2.36 0 0 0
1243 5 MA PIEDRA CHANCADA 1/2" M3 100.3 0 0 0
1244 SP AGUA PARA OBRA m3 118.99
1245 2 MA CLAVO C/CABEZA PRECIO PROMEDIO kg 4 0
1246 2 MA ALAMBRE NEGRO RECOCIDO # 8 kg 4.72 0
1006 MO TECNICO DE CAMPO HH 8.82
1247 MA GRAPAS DE 1.5" KG 6
CON ACEMILA Y PEON
Prec. U. p.u.Cemento
0.08 2
1.50 L A H
1.50 6 2.2 1.5
E MONEDAS
Soles Dólares
OLO TUBERIA Factor 1.18 3.22 1.18
esp
Codigo CU
esor Específica
(mm de Gastos
del insumo Adm. Directa Contrata Adm. Directa Contrata
partida
)
0 2.6.2.3.4.5 Servicios en Costo Direct 19.53 19.53 6.07 6.07
0 2.6.2.3.4.5 Servicios en Costo Direct 16.05 16.05 4.98 4.98
0 2.6.2.3.4.5 Servicios en Costo Direct 14.44 14.44 4.48 4.48
0 2.6.2.3.4.5 Servicios en Costo Direct 15 15 4.66 4.66
0 2.6.2.3.4.5 Servicios en Costo Direct 8.75 8.75 2.72 2.72
56 1
0 2.6.2.3.4.4 Bienes en Costo Directo o 9.2 7.8 2.86 2.42
0 2.6.2.3.4.4 Bienes en Costo Directo o 4.72 4 1.47 1.25
0 2.6.2.3.4.4 Bienes en Costo Directo o 18.88 16 5.86 4.97
0 2.6.2.3.4.4 Bienes en Costo Directo o 23.6 20 7.33 6.21
0 2.6.2.3.4.4 Bienes en Costo Directo o 21.24 18 6.6 5.59
0 2.6.2.3.4.4 Bienes en Costo Directo o 6.73 5.7 2.09 1.77
0 2.6.2.3.4.4 56 118 100 36.65 31.06
0 2.6.2.3.4.4 Bienes en Costo Directo o 30.68 26 9.53 8.08
0 2.6.2.3.4.4 Bienes en Costo Directo o 8.38 7.1 2.6 2.2
0 2.6.2.3.4.4 Bienes en Costo Directo o 4.72 4 1.47 1.25
0 2.6.2.3.4.4 Bienes en Costo Directo o 7.08 6 2.2 1.86
0 2.6.2.3.4.4 Bienes en Costo Directo o 18.88 16 5.86 4.97
0 2.6.2.3.4.4 Bienes en Costo Directo o 23.6 20 7.33 6.21
0 2.6.2.3.4.5 56 354 300 109.94 93.17
0 2.6.2.3.4.5 56 1416 1200 439.75 372.67
0 2.6.2.3.4.4 Bienes en Costo Directo o 41.3 35 12.83 10.87
0 2.6.2.3.4.4 Bienes en Costo Directo o 0.24 0.2 0.07 0.06
0 2.6.2.3.4.4 Bienes en Costo Directo o 4.72 4 1.47 1.25
0 2.6.2.3.4.4 Bienes en Costo Directo o 4.72 4 1.47 1.25
0 2.6.2.3.4.4 Bienes en Costo Directo o 17.7 15 5.5 4.66
0 2.6.2.3.4.4 Bienes en Costo Directo o 5.66 4.8 1.76 1.49
0 2.6.2.3.4.4 Bienes en Costo Directo o 23 19.49 7.14 6.05
0 2.6.2.3.4.4 Bienes en Costo Directo o 82.6 70 25.65 21.74
0 2.6.2.3.4.4 Bienes en Costo Directo o 18.88 16 5.86 4.97
0 2.6.2.3.4.4 Bienes en Costo Directo o 94.4 80 29.32 24.85
0 2.6.2.3.4.4 Bienes en Costo Directo o 17.7 15 5.5 4.66
0 2.6.2.3.4.4 Bienes en Costo Directo o 7.08 6 2.2 1.86
0 2.6.2.3.4.4 Bienes en Costo Directo o 4.72 4 1.47 1.25
0 2.6.2.3.4.4 Bienes en Costo Directo o 3.43 2.91 1.07 0.91
0 2.6.2.3.4.4 Bienes en Costo Directo o 123.9 105 38.48 32.61
0 2.6.2.3.4.4 Bienes en Costo Directo o 5.9 5 1.83 1.55
0 2.6.2.3.4.4 Bienes en Costo Directo o 21.24 18 6.6 5.59
0 2.6.2.3.4.5 56 34195.97 28979.64 10619.87 8999.89
0 2.6.2.3.4.5 56 57015.53 48318.25 17706.69 15005.67
1007 0 0 0
0 2.6.2.3.4.4 Bienes en Costo Directo o 36.52 30.95 11.34 9.61
2.6.2.3.4.4 Bienes en Costo Directo o 192.75 163.35 59.86 50.73
0 2.6.2.3.4.5 Servicios en Costo Direct 4.72 4 1.47 1.25
0 2.6.2.3.4.5 Servicios en Costo Direct 8.26 7 2.57 2.18
0 2.6.2.3.4.5 Servicios en Costo Direct 29.5 25 9.16 7.76
0 2.6.2.3.4.5 Servicios en Costo Direct 19 16.1 5.9 5
0 2.6.2.3.4.4 Bienes en Costo Directo o 23.6 20 7.33 6.21
0 17.7 15 5.5 4.66
0 56 141600 120000 43975.16 37267.08
0 56 708 600 219.88 186.34
0 56 2.36 2 0.73 0.62
0 2.6.2.3.4.4 Bienes en Costo Directo o 100.3 85 31.15 26.4
1018 140.41
4 3.39 1.24 1.05
4.72 4 1.47 1.25
8.82 8.82 2.74 2.74
6 5.08 1.86 1.58
1022 85 2 1018
89 4 69
1022 Cifra de dedondeo decimal del parcial 2
Cod Denominación Rto UND En todo momento, debe
1001 CAMPAMENTO DE TRIPLAY CON TECHO DE CALAMINA 34.56 m2 98.85
1001C
_x000D_
1003 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS 1 Gbl 1416
1003C
_x000D_
1004 TRAZO, NIVELACIÓN Y REPLANTEO DEL EJE DEL CANA 400 m 1.3 Para el replanteo del niv
1004C
_x000D_
1006 ENCOFRADO Y DESENCOFRADO DE MUROS EN CANAL 12 m2 46.97
1006C
La determinación de la
1007 CONCRETO F'C=175 KG/CM2 PARA CANALES 10 m3 521.02 1236
1007C
_x000D_
1009 TRAZO Y REPLANTEO EN OBRAS DE ARTE 200 m2 2.14 Para el replanteo del niv
1009C
- Muros de contención c
1010 ENCOFRADO Y DESENCOFRADO EN OBRAS DE ARTE 6 m2 113.55
1010C
La determinación de la
1017 CONCRETO F'C=210 KG/CM2 10 m3 567.74
1017C
No es materia de la pre
1019 ENCOFRADO Y DESENCOFRADO PARA MUROS RECTO 15 m2 51.93
1019C
• Si se encuentran o
1020 HOYACION PARA PLANTACION EN MACIZO 0.40X0.40X0 0.5 MILLAR 2525.1
1020C
El cartel se instalará sostenido por tres postes de madera de 4" de diámetro a una altura mínima de 2.50m respecto al nivel del te
_x000D_
_x000D_
Para el replanteo del nivel de la rasante se utilizará el nivel topográfico debidamente calibrado.
Los recursos requeridos para esta partida son herramientas manuales tales como picos, lampas, barretas, carretillas, etc._x000D
_x000D_
La determinación de la proporción de agregados, cemento y agua del concreto es recomendable realizarlo mediante mezcla de p
La mezcla de las juntas será con asfalto RC - 250 - ARENA GRUESA en proporción 1:1.5, asimismo se agregará arcilla (filler) en
_x000D_
Para el replanteo del nivel de la rasante se utilizará el nivel topográfico debidamente calibrado.
Antes del vaciado del concreto, el Ingeniero Supervisor revisará el tamaño, forma, longitud, traslape, posición, cantidad del refuer
La superficie final deberá tener el mejor aspecto, en la que no se pueda distinguir los sitios en que estuvieron las cintas, no aprec
Comprende el transporte de los materiales en vehículo desde la ciudad de Huaraz, definido como lugar de compra de los materia
Se denomina así a los trabajos a realizarse en el traslado de los materiales desde punta de carretera hasta la obra mediante la p
Este ítem se refiere a la colocación de concreto simple en cuya masa se incorporan piedras medianas que no contiene armadura
La determinación de la proporción de agregados, cemento y agua del concreto es recomendable realizarlo mediante mezcla de p
No es materia de la presente especificación el concreto para cimientos corridos grados y falsos pisos, el que podrá dosificarse a
• Si se encuentran obstáculos (por ejemplo una roca) al momento de la hoyación se debe cambiar la posición del hoyo para as
Comprende el tendido de las líneas de almabres púa anclado en los postes de madera. Para lo cual fijar en el poste de inicio el a
Comprende la instalación del poste de madera en el hoyo previamente excavada. La parte inferior que va estar en contacto con l
a o por intemperismo a tales materiales o equipo en obra_x000D_.
.50m respecto al nivel del terreno natural, el que será colocado en un lugar visible._x000D_
posición, cantidad del refuerzo metálico y sólo después de su aprobación se procederá al vaciado
tuvieron las cintas, no apreciar las huellas de la aplicación de la paleta, ni ningún otro defecto que desmejore el buen acabado._x000D
ar de compra de los materiales, hasta el sector de Loma, a excepción de los agregados, que serán adquiridos puestos en Loma – punt
hasta la obra mediante la participación de peones y acémila, y de los agregados desde cantera hasta la obra
s que no contiene armadura. La proporción máxima del agregado ciclópeo será en setenta por ciento (70%) de concreto simple y del tr
el que podrá dosificarse a base de cemento y hormigón en las proporciones que se indican adelante (detalles estructurales). En cualq
ijar en el poste de inicio el alambre púa a la altura previaente marcada en el poste y desenrollar con cuidado hasta un extremos de la li
e va estar en contacto con la tierra debe ser recubierta previamente con el asfalto para conservar la madera. Colocar el poste en el hoy
re el buen acabado._x000D_
lles estructurales). En cualquier caso estos concretos no darán una resistencia menor de 100 kg m2, a los 28 días en prueba Standard
o hasta un extremos de la linea y tensar el alambre, luego fijar con grapas el alambre púa en cada uno de los postes, continuar este pr
a. Colocar el poste en el hoyo alineando con los otros postes y rellenar la tierra de la excavación y apizonar para que el poste quede fir
roducidas previa selección y lavado, con el requisito indispensable de que cada piedra en su ubicación definitiva debe estar totalmente
os postes, continuar este procedimiento hasta terminar las las diferentes líneas del alambrado.
EQ TOTAL
0.28 10.77
P.U. Parcial
14.44 9.24
8.82 0.14
17.70 1.11
9.38 0.28
ANALISIS DE COSTOS UNITARIOS DE SUBPARTIDAS
Proyecto
MEJORAMIENTO DE CANAL DE RIEGO HUAMACHUCO
Lugar Distrito: HUAMACHUCO, Provincia: SANCHEZ CARRION, Region: LA LIBERTAD
Elab. Por ING. RAUL OCTAVIO HERNANDEZ URBINA
Fecha 30 DE SETIEMBRE DEL 2018
26 de 110
PLANILLA DE METRADO
Proyecto : MEJORAMIENTO DE CANAL DE RIEGO HUAMACHUCO
Ubicación: Distrito: HUAMACHUCO, Provincia: SANCHEZ CARRION, Region: LA LIBERTAD
PARTIDA Und.
01 TRABAJOS PRELIMINARES
01.01 CAMPAMENTO DE TRIPLAY CON TECHO DE CALAMINA m2
01.02 CARTEL DE OBRA 3.60M X 2.40M CON GIGANTOGRAFÍA Und
01.03 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS Gbl
02 SISTEMA DE ALMACENAMIENTO
02.01 RESERVORIO DE CONCRETO
02.01.01 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2
02.01.02 EXCAVACIÓN EN MATERIAL SUELTO m3
02.01.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg
02.01.04 CONCRETO F'C=210 KG/CM2 m3
02.01.05 ENCOFRADO Y DESENCOFRADO EN OBRAS DE ARTE m2
03 SISTEMAS DE CONDUCCION
03.01 REVESTIMIENTO DE CANAL DE CONCRETO (L=2060 m)
03.01.01 TRAZO, NIVELACIÓN Y REPLANTEO DEL EJE DEL CANAL m
03.01.02 EXCAVACIÓN EN MATERIAL SUELTO m3
03.01.03 ENCOFRADO Y DESENCOFRADO DE MUROS EN CANALES m2
SECCION I
SECCION II
03.01.04 CONCRETO F'C=175 KG/CM2 PARA CANALES m3
SECCION I
MURO
PISO
SECCION II
MURO
PISO
03.01.05 JUNTA ASFÁLTICA EN CANALES m
03.02 OBRAS DE ARTE
03.02.01 DESARENADOR (01 UND)
03.02.01.01 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2
03.02.01.02 EXCAVACIÓN EN MATERIAL SUELTO m3
03.02.01.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg
Ø1/2'' longitudinal
Ø3/8'' transversal
03.02.01.04 ENCOFRADO Y DESENCOFRADO EN OBRAS DE ARTE m2
03.02.01.05 CONCRETO F'C=175 KG/CM2 PARA CANALES m3
03.02.02 POZA DE DISIPACION (12 UND)
03.02.02.01 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2
03.02.02.02 EXCAVACIÓN EN MATERIAL SUELTO m3
03.02.02.03 ENCOFRADO Y DESENCOFRADO EN OBRAS DE ARTE m2
03.02.02.04 CONCRETO CICLOPEO FC=175KG/CM2+30% PM m3
03.02.02.05 TARRAJEO CON IMPERMEABILIZANTE E=1.5CM, M1:5 m2
04 FLETE DE MATERIALES
04.01 FLETE TERRESTRE Gbl
04.02 FLETE RURAL Gbl
Sistemas RW7pro
ANILLA DE METRADO
A LIBERTAD Fecha: 30 DE SETIEMBRE DEL 2018
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
58.72
8.00 6.00 0.99 47.52
5.00 4.00 0.56 11.20
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Proyecto
MEJORAMIENTO DE CANAL DE RIEGO HUAMACHUCO
Lugar Distrito: HUAMACHUCO, Provincia: SANCHEZ CARRION, Region: LA LIBERTAD
Elab. Por ING. RAUL OCTAVIO HERNANDEZ URBINA
Fecha 30 DE SETIEMBRE DEL 2018
30 de 110
ANALISIS DE COSTOS UNITARIOS
Proyecto
MEJORAMIENTO DE CANAL DE RIEGO HUAMACHUCO
Lugar Distrito: HUAMACHUCO, Provincia: SANCHEZ CARRION, Region: LA LIBERTAD
Elab. Por ING. RAUL OCTAVIO HERNANDEZ URBINA
Fecha 30 DE SETIEMBRE DEL 2018
31 de 110
ANALISIS DE COSTOS UNITARIOS
Proyecto
MEJORAMIENTO DE CANAL DE RIEGO HUAMACHUCO
Lugar Distrito: HUAMACHUCO, Provincia: SANCHEZ CARRION, Region: LA LIBERTAD
Elab. Por ING. RAUL OCTAVIO HERNANDEZ URBINA
Fecha 30 DE SETIEMBRE DEL 2018
32 de 110
ANALISIS DE COSTOS UNITARIOS
Proyecto
MEJORAMIENTO DE CANAL DE RIEGO HUAMACHUCO
Lugar Distrito: HUAMACHUCO, Provincia: SANCHEZ CARRION, Region: LA LIBERTAD
Elab. Por ING. RAUL OCTAVIO HERNANDEZ URBINA
Fecha 30 DE SETIEMBRE DEL 2018
33 de 110
ANALISIS DE COSTOS UNITARIOS
Proyecto
MEJORAMIENTO DE CANAL DE RIEGO HUAMACHUCO
Lugar Distrito: HUAMACHUCO, Provincia: SANCHEZ CARRION, Region: LA LIBERTAD
Elab. Por ING. RAUL OCTAVIO HERNANDEZ URBINA
Fecha 30 DE SETIEMBRE DEL 2018
34 de 110
ANALISIS DE COSTOS UNITARIOS
Proyecto
MEJORAMIENTO DE CANAL DE RIEGO HUAMACHUCO
Lugar Distrito: HUAMACHUCO, Provincia: SANCHEZ CARRION, Region: LA LIBERTAD
Elab. Por ING. RAUL OCTAVIO HERNANDEZ URBINA
Fecha 30 DE SETIEMBRE DEL 2018
35 de 110
RELACION DE INSUMOS DEL PROYECTO
Proyecto MEJORAMIENTO DE CANAL DE RIEGO HUAMACHUCO
Lugar Distrito: HUAMACHUCO, Provincia: SANCHEZ CARRION, Region: LA LIBERTAD
Elab. Por ING. RAUL OCTAVIO HERNANDEZ URBINA
Fecha 30 DE SETIEMBRE DEL 2018
50.00 0.00%
100.00 0.01%
80.00 0.01%
610.00
60.00 0.01%
400.00 0.04%
150.00 0.01%
450.00
180.00 0.02%
270.00 0.02%
2016.00
396.00 0.03%
300.00 0.03%
1320.00 0.12%
2015.99
PRESUPUESTO CON ESPECIFICA DE GASTO POR PA
Proyecto
Lugar
Elab. Por
Fecha
Especifica de Gasto
O POR PARTIDAS
PARCIAL
CANTIDAD DE INSUMOS POR PARTIDA
Proyecto
MEJORAMIENTO DE CANAL DE RIEGO HUAMACHUCO
Lugar Distrito: HUAMACHUCO, Provincia: SANCHEZ CARRION, Region: LA LIBERTAD
Elab. Por ING. RAUL OCTAVIO HERNANDEZ URBINA
Fecha 30 DE SETIEMBRE DEL 2018
MATERIALES
1021 CLAVOS PARA CALAMINA KG
1022 CLAVOS PARA MADERA DE 3" KG
1023 MADERA DE EUCALIPTO 4"X3M PARA PARANTES UND
1024 MADERA DE AUCALIPTO 4" X 5M PARA VIGAS UND
1025 CALAMINA DE 183CM X 83CM X 0.22MM PZA
1026 CANDADO MEDIANO UND
1028 TRIPLAY E=4MM PZA
1029 BISAGRA DE 4"X4" UND
1030 CLAVOS PARA MADERA DE 4" KG
1031 CLAVOS PARA MADERA DE 1" KG
1032 MADERA DE EUCALIPTO 3" X 4M PARA VIGUETAS UND
EQUIPOS Y HERRAMIENTAS
1900 HERRAMIENTAS MANUALES %MO
MATERIALES
1022 CLAVOS PARA MADERA DE 3" KG
1033 MADERA DE AUCALIPTO 4" X 5M PARA CARTEL UND
EQUIPOS Y HERRAMIENTAS
1900 HERRAMIENTAS MANUALES %MO
MATERIALES
1036 PINTURA ESMALTE SINTETICO GLN
1037 ESTACA DE MADERA UND
EQUIPOS Y HERRAMIENTAS
1900 HERRAMIENTAS MANUALES %MO
1901 MIRA TOPOGRÁFICA DIA_M 1
1902 NIVEL TOPOGRAFICO DIA_M 1
MATERIALES
1900 HERRAMIENTAS MANUALES %MO
MATERIALES
1038 ALAMBRE NEGRO # 16 KG
1039 CLAVOS PARA MADERA DE 2 3 Y 4" KG
1040 PETROLEO GLN
1041 MADERA TORNILLO PARA ENCOFRADO P2
EQUIPOS Y HERRAMIENTAS
1900 HERRAMIENTAS MANUALES %MO
MATERIALES
1042 CEMENTO PORTLAND TIPO I (42.5KG) BLS
1043 HORMIGON M3
1044 GASOLINA DE 90 OCTANOS GLN
EQUIPOS Y HERRAMIENTAS
1900 HERRAMIENTAS MANUALES %MO
1903 MEZCLADORA DE CONCRETO 9-11 P3 DIA_M 1
1904 VIBRADORA DE CONCRETO DIA_M 1
MATERIALES
1045 ARENA GRUESA M3
1046 ASFALTO RC-250 GLN
EQUIPOS Y HERRAMIENTAS
1900 HERRAMIENTAS MANUALES %MO
MATERIALES
1036 PINTURA ESMALTE SINTETICO GLN
1037 ESTACA DE MADERA UND
1047 YESO EN BOLSA DE 20KG BL
EQUIPOS Y HERRAMIENTAS
1900 HERRAMIENTAS MANUALES %MO
MATERIALES
1900 HERRAMIENTAS MANUALES %MO
MATERIALES
1038 ALAMBRE NEGRO # 16 KG
1049 ACERO DE REFUERZO FY=4200 KG
EQUIPOS Y HERRAMIENTAS
1900 HERRAMIENTAS MANUALES %MO
MATERIALES
1039 CLAVOS PARA MADERA DE 2 3 Y 4" KG
1041 MADERA TORNILLO PARA ENCOFRADO P2
1048 ALAMBRE NEGRO # 8 KG
EQUIPOS Y HERRAMIENTAS
1900 HERRAMIENTAS MANUALES %MO
MATERIALES
1042 CEMENTO PORTLAND TIPO I (42.5KG) BLS
1043 HORMIGON M3
1044 GASOLINA DE 90 OCTANOS GLN
EQUIPOS Y HERRAMIENTAS
1900 HERRAMIENTAS MANUALES %MO
1903 MEZCLADORA DE CONCRETO 9-11 P3 DIA_M 1
1904 VIBRADORA DE CONCRETO DIA_M 1
MATERIALES
1036 PINTURA ESMALTE SINTETICO GLN
1037 ESTACA DE MADERA UND
1047 YESO EN BOLSA DE 20KG BL
EQUIPOS Y HERRAMIENTAS
1900 HERRAMIENTAS MANUALES %MO
MATERIALES
1900 HERRAMIENTAS MANUALES %MO
MATERIALES
1039 CLAVOS PARA MADERA DE 2 3 Y 4" KG
1041 MADERA TORNILLO PARA ENCOFRADO P2
1048 ALAMBRE NEGRO # 8 KG
EQUIPOS Y HERRAMIENTAS
1900 HERRAMIENTAS MANUALES %MO
MATERIALES
1057 PIEDRA MEDIANA M3
SUBPARTIDAS
1056 CONCRETO F'C=175 KG/CM2 m3
EQUIPOS Y HERRAMIENTAS
1900 HERRAMIENTAS MANUALES %MO
MATERIALES
1042 CEMENTO PORTLAND TIPO I (42.5KG) BLS
1050 ARENA FINA M3
1051 REGLA DE MADERA P2
1052 IMPERMEABILIZANTE GLN
EQUIPOS Y HERRAMIENTAS
1900 HERRAMIENTAS MANUALES %MO
3 1044.49 31.33
31.33
0.07 4 0.28
2 20 40
40.28
1 300 300
300
3 179.72 5.39
5.39
1 1200 1200
1200
Monto total de la partida S/. : 2594.13
0.618 35 21.63
206 0.2 41.2
62.83
3 2017.57 60.53
5.15 32 164.8
5.15 56 288.4
513.73
3 32523.71 975.71
975.71
220.56 4 882.24
264.672 4 1058.69
88.224 15 1323.36
4234.752 4.8 20326.81
23591.1
3 73549.41 2206.48
2206.48
4.891 80 391.28
48.91 15 733.65
1124.93
3 17580.21 527.41
527.41
0.02049 35 0.72
13.66 0.2 2.73
0.10245 5 0.51
3.96
5 9.29 0.46
0.46
3 229.76 6.89
6.89
4.4611 4 17.84
68.1911 2.91 198.44
216.28
3 102.01 3.06
3.06
Monto total de la partida S/. : 2455.15
4.46 4 17.84
82.51 4.8 396.05
4.46 4 17.84
431.73
3 1964.49 58.93
58.93
3 633.92 19.02
0.34 200 68
0.34 128.8 43.79
130.81
0.00225 35 0.08
1.5 0.2 0.3
0.01125 5 0.06
0.44
5 1.03 0.05
0.05
3 3.14 0.09
0.09
Monto total de la partida S/. : 57.27
0.104 4 0.42
1.924 4.8 9.24
0.104 4 0.42
10.08
3 45.82 1.37
1.37
3 0.92 0.03
0.03
3 17.67 0.53
0.53
1 12279.09 12279.09
12279.09
1 21761.57 21761.57
21761.57
Sistemas RW7pro
DETERMINACION DE LA FORMULA POLINOMICA
Proyecto : MEJORAMIENTO DE CANAL DE RIEGO HUAMACHUCO
Lugar : Distrito: HUAMACHUCO, Provincia: SANCHEZ CARRION, Region: LA LIBERTAD
Elab. Por
: ING. RAUL OCTAVIO HERNANDEZ URBINA
Fecha : 30 DE SETIEMBRE DEL 2018
AGRUPACION PRELIMINAR
COEF. AGR.
N° IU ELEMENTO PARCIAL % INCID. AGR. 1
ACUM.1 2
CONFORMACION DE MONOMIOS
COEF. SIMB. % COEF.
N°M N° IU IU ELEMENTO INICIAL AGRUP. INCID. ACUM.
1 1 47 Mano de obra (incluido leyes sociales) 0.509 J 100.00 0.509
2 2 21 Cemento portlan tipo I 0.130 C 100.00 0.130
3 3 43 Madera nacional para encofrado y carpintería 0.108 M 100.00 0.108
4 4 32 Flete terrestre 0.041 FHA 62.12 0.066
5 37 Herramienta manual 0.015 FHA 22.73
6 02 Acero de construcción liso 0.010 FHA 15.15
5 7 05 Agregado grueso 0.037 AAM 37.00 0.100
8 04 Agregado fino 0.037 AAM 37.00
9 49 Maquinaria y equipo importado 0.026 AAM 26.00
6 10 39 Indice General de Precios al Consumidor 0.087 G 100.00 0.087
TOTAL 1.000 1.000
FORMULA POLINOMICA:
Jr Cr Mr FHAr AAMr
K= 0.509 ---------- + 0.130 ---------- + 0.108 ---------- + 0.066 ---------- + 0.100 ----------
Jo Co Mo FHAo AAMo
Orden.
COEF.
Monom
ACUM.2
.
0.509 1
0.130 2
0.108 3
0.066 4
4
4
0.100 5
5
5
0.087 6
1.000
Gr
+ 0.087 ----------
Go
Sistemas RW7pro
Descripción Monto(S/.)
Flete Rural 57 015.53
Flete Terrestre 34 195.97
TOTAL 91 211.50
PRESUPUESTO ANALITICO
Proyecto MEJORAMIENTO DE CANAL DE RIEGO HUAMACHUCO
100.00%
80.00%
PA
60.00%
40.00%
20.00%
0.00%
Inicio 1 2 3 4
Sistemas RW7pro
METRA
PRESU
PUEST
DO
PARTIDAS UND
O
###
### ### #NAME? ### ### #NAME?
### ### #NAME? ### ### #NAME?
### ### #NAME? ### ### #NAME?
03 SISTEMAS DE CONDUCCION
03.01 REVESTIMIENTO DE CANAL DE CONCRETO (L=2060 m)
### 03.01.01TRAZO, NIVELACIÓN Y REPLANTEO DEL EJE DEL CANAL m 4500.00 5850
### 03.01.02EXCAVACIÓN EN MATERIAL SUELTO m3 620.00 33498.6
### 03.01.03ENCOFRADO Y DESENCOFRADO DE MUROS EN CANALE m2 ### 563640
### 03.01.04CONCRETO F'C=175 KG/CM2 PARA CANALES m3 825.00 429842
### 03.01.05JUNTA ASFÁLTICA EN CANALES m 0.00 0
03.02 OBRAS DE ARTE
03.02.01 DESARENADOR (01 UND)
### 03.02.01TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 0.00 0
### 03.02.01EXCAVACIÓN EN MATERIAL SUELTO m3 0.00 0
### 03.02.01ACERO DE REFUERZO FY=4200 KG/CM2 kg 58.72 331.18
### 03.02.01ENCOFRADO Y DESENCOFRADO EN OBRAS DE ARTE m2 0.00 0
### 03.02.01CONCRETO F'C=175 KG/CM2 PARA CANALES m3 0.00 0
03.02.02 POZA DE DISIPACION (12 UND)
### 03.02.02TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 0.00 0
### 03.02.02EXCAVACIÓN EN MATERIAL SUELTO m3 0.00 0
### 03.02.02ENCOFRADO Y DESENCOFRADO EN OBRAS DE ARTE m2 0.00 0
### 03.02.02CONCRETO CICLOPEO FC=175KG/CM2+30% PM m3 0.00 0
### 03.02.02TARRAJEO CON IMPERMEABILIZANTE E=1.5CM, M1:5 m2 0.00 0
04 FLETE DE MATERIALES
### 04.01 FLETE TERRESTRE Gbl 1.00 34196
### 04.02 FLETE RURAL Gbl 1.00 57015.5
AVANCE MENSUAL(%)
PROGRAMADO
AVANCE ACUMULADO(%)
Inicio: 1/2/2018
Plazo (días calendarios): 554 475 días labor Feriados
Fin: 7/9/2019 SL
Unidad de programación: MESES DNL 4 4 4 5 4 4 5 4 5 4 4 5 4 4 5 4
2018 2019
CUADRIL
DIAS
CADENA DE
PRECE DENCIA MES
LA
27 May
27 Aug
25 Sep
26 Nov
26 Dec
24 Feb
27 Mar
24 Feb
26 Mar
27 Jan
26 Jun
27 Jan
25 Apr
27 Oct
26 Apr
SEPARACION
26 Jul
Inicio DIAS L.
### 1 10 #NAME? 1
### 1 12 #NAME? 1
### 2 10FC+1 1S60 #NAME? 1 1
2.25 5 10 5 5
0.533 465 17CC+1 465 25 24 27 25 27 26 26 27 25 27 26 26 27 24 26 26
2.174 460 18CC+6 460 19 24 27 25 27 26 26 27 25 27 26 26 27 24 26 26
0.179 460 19CC+2 460 17 24 27 25 27 26 26 27 25 27 26 26 27 24 26 26
0 6 20
0 1 20CC+8 1
0 2 24 2
0.235 1 25 1 1
0 3 26 3
0 1 27 1
0 1 28FC+10 1
0 1 30 1
0 2 31 2
0 1 32 1
0 1 33 1
0.059 17 10 5S18,6S18 12 6 3 3
0.056 18 36CC+1 7S18,6S18 18 7 6 5
#NAME? #NAME?
UMULADO(%) #NAME? #NAME?
27 25
27 24
25 Jun
6
27 25 2
2019
27 Jul
#NAME?
#NAME?
5 4 4
27 Aug
5
25 Sep
27 Oct 4
4
26 Nov
5
26 Dec
4
27 Jan
4
25 Feb
5
26 Mar
4
26 Apr
5
26 May
26 Jun
2020
27 Jul
#NAME?
#NAME?
4 4 5
26 Aug
4
26 Sep
4
27 Oct
5
25 Nov
4
27 Dec
5
26 Jan
4
24 Feb
4
27 Mar
4
26 Apr
5
26 May
26 Jun
2021
27 Jul
#NAME?
#NAME?
4 4 5
26 Aug
4
26 Sep
5
26 Oct
4
26 Nov
4
27 Dec
5
26 Jan
4
24 Feb
4
27 Mar
4
26 Apr
26 May 5
26 Jun 2022
26 Jul
#NAME?
#NAME?
4 5 4
27 Aug
4
26 Sep
5
26 Oct
4
26 Nov
4
27 Dec
5
26 Jan
4
24 Feb
4
27 Mar
5
25 Apr
4
27 May
26 Jun
2023
26 Jul
#NAME?
#NAME?
4 5 4
27 Aug
4
26 Sep
5
26 Oct
4
26 Nov
5
26 Dec
4
27 Jan
4
25 Feb
5
26 Mar
4
26 Apr
4
27 May
5
25 Jun
2024
#NAME?
#NAME?
2024
27 Jul
#NAME?
#NAME?
4 4
27 Aug
5
25 Sep
4
27 Oct
4
26 Nov
26 Dec 5
4
27 Jan
4
24 Feb
5
26 Mar
4
26 Apr
4
27 May
25 Jun
2025
27 Jul
#NAME?
#NAME?
5 4 5
26 Aug
4
26 Sep
4
27 Oct
5
25 Nov
4
27 Dec
4
27 Jan
4
24 Feb
5
26 Mar
4
26 Apr
5
26 May
26 Jun
2026
27 Jul
#NAME?
#NAME?
4 4 5
26 Aug
4
26 Sep
4
27 Oct
5
25 Nov
4
27 Dec
5
26 Jan
4
24 Feb
4
27 Mar
4
26 Apr
5
26 May
26 Jun
2027
27 Jul
#NAME?
#NAME?
4 4 5
26 Aug
4
26 Sep
5
26 Oct
4
26 Nov
4
27 Dec
5
26 Jan
4
25 Feb
4
27 Mar
5
25 Apr
4
27 May
26 Jun
2028
26 Jul
#NAME?
#NAME?
4 5 4
27 Aug
4
26 Sep
5
26 Oct
4
26 Nov
5
26 Dec
4
27 Jan
4
24 Feb
4
27 Mar
5
25 Apr
4
27 May
26 Jun
2029
26 Jul
#NAME?
#NAME?
4 5 4
27 Aug
2029
#NAME?
#NAME?
5
25 Sep
4
27 Oct
4
26 Nov
5
26 Dec
4
27 Jan
24 Feb 4
5
26 Mar
4
26 Apr
4
27 May
25 Jun
2030
27 Jul
#NAME?
#NAME?
5 4 4
27 Aug
5
25 Sep
4
27 Oct
4
26 Nov
5
26 Dec
4
27 Jan
4
24 Feb
5
26 Mar
4
26 Apr
4
27 May
25 Jun
2031
27 Jul
#NAME?
#NAME?
5 4 5
26 Aug
4
26 Sep
4
27 Oct
5
25 Nov
4
27 Dec
4
27 Jan
5
24 Feb
4
27 Mar
#NAM
#NAM
2032
4
26 Apr
5
26 May
26 Jun
2032
27 Jul
#NAME?
#NAME?
4 4 5
26 Aug
26 Sep 4
5
26 Oct
4
26 Nov
4
27 Dec
5
26 Jan
4
24 Feb
4
27 Mar
4
26 Apr
5
26 May
26 Jun
2033
26 Jul
#NAME?
#NAME?
4 5 4
27 Aug
4
26 Sep
5
26 Oct
4
26 Nov
4
27 Dec
5
26 Jan
4
24 Feb
4
27 Mar
5
25 Apr
4
27 May
26 Jun
2034
26 Jul
#NAME?
#NAME?
4 5 4
27 Aug
4
26 Sep
5
26 Oct
E?
E?
4
26 Nov
5
26 Dec
4
27 Jan
4
24 Feb
4
27 Mar
25 Apr 5
4
27 May
26 Jun
2035
26 Jul
#NAME?
#NAME?
4 5 4
27 Aug
5
25 Sep
4
27 Oct
4
26 Nov
5
26 Dec
4
27 Jan
4
25 Feb
5
26 Mar
4
26 Apr
4
27 May
25 Jun
2036
27 Jul
#NAME?
#NAME?
5 4 5
26 Aug
4
26 Sep
4
27 Oct
5
25 Nov
4
27 Dec
4
27 Jan
4
24 Feb
5
26 Mar
4
26 Apr
5
26 May
2037
#NAME?
#NAME?
26 Jun
2037
27 Jul
#NAME?
#NAME?
4 4 5
26 Aug
4
26 Sep
4
27 Oct
25 Nov 5
4
27 Dec
5
26 Jan
4
24 Feb
4
27 Mar
4
26 Apr
5
26 May
26 Jun
2038
27 Jul
#NAME?
#NAME?
4 4 5
26 Aug
4
26 Sep
5
26 Oct
4
26 Nov
4
27 Dec
5
26 Jan
4
24 Feb
4
27 Mar
4
26 Apr
5
26 May
26 Jun
2039
26 Jul
#NAME?
#NAME?
4 5 4
27 Aug
4
26 Sep
5
26 Oct
4
26 Nov
4
27 Dec
5 4 4 5 4 4 5 4 5 4 4 5 4 4 5 4 4 5 4 4 5 4 4 5
2040 2041 1 2 3 4 5 6 7
27 May
27 May
27 Aug
25 Sep
26 Nov
26 Dec
27 Aug
25 Sep
26 Nov
26 Dec
25 Feb
27 Mar
24 Feb
26 Mar
26 Jan
26 Jun
27 Jan
25 Jun
25 Apr
27 Oct
26 Apr
27 Oct
26 Jul
27 Jul
#####################
0 0 0 0 0 0 0
#####################
#####################
#####################
0 0 0 0 0 0 0
0 0 0 0 0 0 0
1 0 0 0 0 0 0
1 0 0 0 0 0 0
1 0 0 0 0 0 0
1 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
1 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
1 0 0 0 0 0 0
1 0 0 0 0 0 0
#NAME? #NAME?
#NAME? #NAME?
SNL
SL
DNL
DL
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
###################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
###################################################
###################################################
###################################################
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sistemas RW7pro
PROGRAMACIÓN DE LA EJECUCION FISICA DE LA OBRA
PROYECTO: MEJORAMIENTO DE CANAL DE RIEGO HUAMACHUCO
LUGAR: Distrito: HUAMACHUCO, Provincia: SANCHEZ CARRION, Region: LA LIBERTAD
Fecha 30 DE SETIEMBRE DEL 2018 Plazo (días calendarios):
#NAME?
Unidad de programación:
METRADO
PUESTO
PRESU
PARTIDAS UND
###
### #NAME? #NAME? ### ### #NAME?
### #NAME? #NAME? ### ### #NAME?
### #NAME? #NAME? ### ### #NAME?
03 SISTEMAS DE CONDUCCION
03.01 REVESTIMIENTO DE CANAL DE CONCRETO (L=2060 m)
### 03.01.01 TRAZO, NIVELACIÓN Y REPLANTEO DEL EJE DEL CANAL m 4500.00 5850
### 03.01.02 EXCAVACIÓN EN MATERIAL SUELTO m3 620.00 33498.6
### 03.01.03 ENCOFRADO Y DESENCOFRADO DE MUROS EN CANALE m2 ### 563640
### 03.01.04 CONCRETO F'C=175 KG/CM2 PARA CANALES m3 825.00 429842
### 03.01.05 JUNTA ASFÁLTICA EN CANALES m 0.00 0
03.02 OBRAS DE ARTE
2 03.02.01 DESARENADOR (01 UND)
### 03.02.01.01 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 0.00 0
### 03.02.01.02 EXCAVACIÓN EN MATERIAL SUELTO m3 0.00 0
### 03.02.01.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 58.72 331.18
### 03.02.01.04 ENCOFRADO Y DESENCOFRADO EN OBRAS DE ARTE m2 0.00 0
### 03.02.01.05 CONCRETO F'C=175 KG/CM2 PARA CANALES m3 0.00 0
2 03.02.02 POZA DE DISIPACION (12 UND)
### 03.02.02.01 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 0.00 0
### 03.02.02.02 EXCAVACIÓN EN MATERIAL SUELTO m3 0.00 0
### 03.02.02.03 ENCOFRADO Y DESENCOFRADO EN OBRAS DE ARTE m2 0.00 0
### 03.02.02.04 CONCRETO CICLOPEO FC=175KG/CM2+30% PM m3 0.00 0
### 03.02.02.05 TARRAJEO CON IMPERMEABILIZANTE E=1.5CM, M1:5 m2 0.00 0
04 FLETE DE MATERIALES
### 04.01 FLETE TERRESTRE Gbl 1.00 34196
### 04.02 FLETE RURAL Gbl 1.00 57015.5
AVANCE DIARIO(%)
PROGRAMADO
AVANCE ACUMULADO(%)
FISICA DE LA OBRA
Inicio: 1/2/2018
Plazo (días calendarios): 87
Fin: 3/29/2018
Unidad de programación: DIAS SL
DNL D D
CUADRILLA
02/01/18
03/01/18
04/01/18
05/01/18
06/01/18
07/01/18
08/01/18
09/01/18
10/01/18
11/01/18
12/01/18
13/01/18
14/01/18
15/01/18
16/01/18
17/01/18
18/01/18
DIAS
CADENA DE
PRECE DENCIA
SEPARACION FECHA
Inicio DIAS N. L. 1 1
### 1 10 1 1
### 1 12 1 1
### 2 10FC+1 1S60 2 1
2.25 5 10 5 1 1 1 1 1
3.815 65 17CC+1 65 1 1 1 1 1 1 1 1 1 1 1 1 1 1
16.67 60 18CC+6 60 1 1 1 1 1 1 1 1
1.375 60 19CC+2 60 1 1 1 1 1 1
0 6 20 6
0 1 20CC+8 1
0 2 24 2
0.235 1 25 1
0 3 26 3
0 1 27 1
0 1 28FC+10 1
0 1 30 1
0 2 31 2
0 1 32 1
0 1 33 1
0.059 17 10 5S18,6S18 17 1 1 1 1 1
0.056 18 36CC+1 7S18,6S18 18 1 1 1 1 1 1 1
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
UMULADO(%)
1
1
1
#NAME? #NAME? 19/01/18
1
1
1
#NAME? #NAME? 20/01/18
1
D
#NAME? #NAME? 21/01/18
1
1
1
1
#NAME? #NAME? 22/01/18
1
1
1
1
#NAME? #NAME? 23/01/18
1
1
1
1
#NAME? #NAME? 24/01/18
1
1
1
1
#NAME? #NAME? 25/01/18
1
1
1
1
#NAME? #NAME? 26/01/18
1
1
1
1
#NAME? #NAME? 27/01/18
1
D
1
1
1
1
1
#NAME? #NAME? 29/01/18
1
1
1
1
1
#NAME? #NAME? 30/01/18
1
1
1
1
#NAME? #NAME? 31/01/18
1
1
1
1
1
#NAME? #NAME? 01/02/18
1
1
1
1
1
#NAME? #NAME? 02/02/18
1
1
1
1
1
#NAME? #NAME? 03/02/18
1
D
1
1
1
1
#NAME? #NAME? 05/02/18
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
#NAME? #NAME? 21/02/18
1
1
1
#NAME? #NAME? 22/02/18
1
1
1
#NAME? #NAME? 23/02/18
1
1
1
#NAME? #NAME? 24/02/18
1
D
#NAME? #NAME? 25/02/18
1
1
1
1
#NAME? #NAME? 26/02/18
1
1
1
1
#NAME? #NAME? 27/02/18
1
1
1
1
#NAME? #NAME? 28/02/18
1
1
1
1
1
#NAME? #NAME? 01/03/18
1
1
1
1
1
#NAME? #NAME? 02/03/18
1
1
1
1
1
#NAME? #NAME? 03/03/18
1
D
1
1
1
1
#NAME? #NAME? 05/03/18
1
1
1
1
#NAME? #NAME? 06/03/18
1
1
1
#NAME? #NAME? 07/03/18
1
1
#NAME? #NAME?
1 08/03/18
1
1
1
#NAME? #NAME? 09/03/18
1
1
1
1
D
#NAME? #NAME? 25/03/18
1
#NAME? #NAME? 26/03/18
1
#NAME? #NAME? 27/03/18
1
#NAME? #NAME? 28/03/18
1
#NAME? #NAME? 29/03/18
#NAME? #NAME? 30/03/18
#NAME? #NAME? 31/03/18
1
D
1
D
#NAME? #NAME? 29/04/18
#NAME? #NAME? 30/04/18
#NAME? #NAME? 01/05/18
#NAME? #NAME? 02/05/18
#NAME? #NAME? 03/05/18
#NAME? #NAME? 04/05/18
#NAME? #NAME? 05/05/18
1
D
1
D
#NAME? #NAME? 03/06/18
#NAME? #NAME? 04/06/18
#NAME? #NAME? 05/06/18
#NAME? #NAME? 06/06/18
#NAME? #NAME? 07/06/18
#NAME? #NAME? 08/06/18
#NAME? #NAME? 09/06/18
1
D
1
D
#NAME? #NAME? 01/07/18
#NAME? #NAME? 02/07/18
#NAME? #NAME? 03/07/18
#NAME? #NAME? 04/07/18
#NAME? #NAME? 05/07/18
#NAME? #NAME? 06/07/18
#NAME? #NAME? 07/07/18
1
D
1
#NAME? #NAME? 05/08/18 D
#NAME? #NAME? 06/08/18
#NAME? #NAME? 07/08/18
#NAME? #NAME? 08/08/18
#NAME? #NAME? 09/08/18
#NAME? #NAME? 10/08/18
#NAME? #NAME? 11/08/18
1
D
1
D
#NAME? #NAME? 02/09/18
#NAME? #NAME? 03/09/18
#NAME? #NAME? 04/09/18
#NAME? #NAME? 05/09/18
#NAME? #NAME? 06/09/18
#NAME? #NAME? 07/09/18
#NAME? #NAME? 08/09/18
1
D
1
D
#NAME? #NAME? 07/10/18
#NAME? #NAME? 08/10/18
#NAME? #NAME? 09/10/18
#NAME? #NAME? 10/10/18
#NAME? #NAME? 11/10/18
#NAME? #NAME? 12/10/18
#NAME? #NAME? 13/10/18
1
D
1
D
#NAME? #NAME? 11/11/18
#NAME? #NAME? 12/11/18
#NAME? #NAME? 13/11/18
#NAME? #NAME? 14/11/18
#NAME? #NAME? 15/11/18
#NAME? #NAME? 16/11/18
#NAME? #NAME? 17/11/18
1
D
1
D
#NAME? #NAME? 09/12/18
#NAME? #NAME? 10/12/18
#NAME? #NAME? 11/12/18
#NAME? #NAME? 12/12/18
#NAME? #NAME? 13/12/18
#NAME? #NAME? 14/12/18
#NAME? #NAME? 15/12/18
1
D
DL
SNL
DNL
Sistemas RW7pro
PROGRAMACIÓN DE LA EJECUCION FISICA DE LA OBRA
PROYECTO: MEJORAMIENTO DE CANAL DE RIEGO HUAMACHUCO
LUGAR: Distrito: HUAMACHUCO, Provincia: SANCHEZ CARRION, Region: LA LIBERTAD
Fecha 30 DE SETIEMBRE DEL 2018 Plazo (días calendarios):
Costo Directo S/. #NAME?
Unidad de programación:
METR
PRES
PUES
ADO
TO
PARTIDAS UND
U
###
### #NAME? #NAME? ### ### #NAME?
### #NAME? #NAME? ### ### #NAME?
### #NAME? #NAME? ### ### #NAME?
03 SISTEMAS DE CONDUCCION
03.01 REVESTIMIENTO DE CANAL DE CONCRETO (L=2060 m)
### 03.01.01 TRAZO, NIVELACIÓN Y REPLANTEO DEL EJE DEL CANAL m 4500.00 5850
### 03.01.02 EXCAVACIÓN EN MATERIAL SUELTO m3 620.00 33498.6
### 03.01.03 ENCOFRADO Y DESENCOFRADO DE MUROS EN CANALE m2 ### 563640
### 03.01.04 CONCRETO F'C=175 KG/CM2 PARA CANALES m3 825.00 429842
### 03.01.05 JUNTA ASFÁLTICA EN CANALES m 0.00 0
03.02 OBRAS DE ARTE
03.02.01 DESARENADOR (01 UND)
### 03.02.01.0TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 0.00 0
### 03.02.01.0EXCAVACIÓN EN MATERIAL SUELTO m3 0.00 0
### 03.02.01.0ACERO DE REFUERZO FY=4200 KG/CM2 kg 58.72 331.18
### 03.02.01.0ENCOFRADO Y DESENCOFRADO EN OBRAS DE ARTE m2 0.00 0
### 03.02.01.0CONCRETO F'C=175 KG/CM2 PARA CANALES m3 0.00 0
03.02.02 POZA DE DISIPACION (12 UND)
### 03.02.02.0TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 0.00 0
### 03.02.02.0EXCAVACIÓN EN MATERIAL SUELTO m3 0.00 0
### 03.02.02.0ENCOFRADO Y DESENCOFRADO EN OBRAS DE ARTE m2 0.00 0
### 03.02.02.0CONCRETO CICLOPEO FC=175KG/CM2+30% PM m3 0.00 0
### 03.02.02.0TARRAJEO CON IMPERMEABILIZANTE E=1.5CM, M1:5 m2 0.00 0
04 FLETE DE MATERIALES
### 04.01 FLETE TERRESTRE Gbl 1.00 34196
### 04.02 FLETE RURAL Gbl 1.00 57015.5
AVANCE MENSUAL(%)
PROGRAMADO
AVANCE ACUMULADO(%)
DIAS
CADENA DE
PRECE DENCIA
SEPARACION DIAS C.
6
7
7
7
4
0
3
7
7
7
4
0
3
7
7
7
7
0
7
7
7
7
Inicio DIAS L.
6
6
6
6
3
0
3
6
6
6
3
0
3
6
6
6
6
0
6
6
6
6
### 1 36CC+5 ### 1
### 1 12 ### 1
### 2 12FC+1 1S30 ### 1 1
2.25 5 10 5 5
3.815 65 17CC+1 65 4 6 6 6 3 0 3 6 6 6 3 0 3 6 6 1
16.67 60 18CC+6 60 4 6 6 3 0 3 6 6 6 3 0 3 6 6 2
1.375 60 19CC+2 60 2 6 6 3 0 3 6 6 6 3 0 3 6 6 4
0 6 20 2 4 0
0 1 20CC+8 1
0 2 24 2
0.235 1 25 1 1
0 3 26 2 1
0 1 27 1 0
0 1 28FC+10 1
0 1 30 1
0 2 31 2
0 1 32 1
0 1 33 1
0.059 17 10 1S17,6S15 17 1 5 1 2 6 2
0.056 18 36CC+1 3S15,6S13 18 3 4 2 3 6
46 47 48
#########
0 0 0
0 0 0
#########
#########
#########
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
AVANCE FISICO DE OBRA VAL
MES :
PRESUPUESTO BASE
PARTIDAS UND.
METR. C.U.
O DE OBRA VALORIZADO Nº …….
PARCIAL
METR. VALORIZADO METR. VALORIZADO METR. VALORIZADO %
DURACION EN DIAS
SALDOS
AVANCES
PROGR
SALDO
METR. VALORIZADO AMADO ANTE ACTU ACUMU %
RIOR AL LADO
CALCULO DEL COEFICIENTE "K" PARA EL REAJUSTE
Proyecto :
MEJORAMIENTO DE CANAL DE RIEGO HUAMACHUCO
:
Lugar Distrito: HUAMACHUCO, Provincia: SANCHEZ CARRION, Region: LA LIBERTAD
INDICES UNIFICADOS
SIMB. % COEF. SIN PONDERAR PONDERADOS
N° IU ELEMENTO AGRUP. INCID. ACUM. Oct-13 Jan-14 Feb-14 Oct-13
1 47 Mano de obra (incluido leyes sociales) J 100.000 0.381 497.55 498.10 498.10 497.55
2 72 Tubería de PVC para agua T 100.000 0.090 356.58 370.19 376.37 356.58
3 4 Agregado fino AM 65.620 0.128 754.16 754.16 764.34 691.05
4 43 Madera nacional para encofrado y carpintería AM 34.380 570.60 572.02 577.63
5 21 Cemento Portlan tipo I CAB 33.630 0.113 339.42 339.42 339.42 479.53
6 3 Acero de construcción corrugado CAB 41.070 468.45 474.67 473.60
7 17 Bloque y ladrillo CAB 25.300 683.76 682.87 684.31
8 32 Flete terrestre F 100.000 0.033 455.86 455.19 455.19 455.86
9 39 Indice General de Precios al Consumidor G 100.000 0.255 392.43 393.46 395.83 392.43
TOTAL 1.000 K=
LIBERTAD
S UNIFICADOS
PONDERADOS
Jan-14 Feb-14
498.10 498.10
370.19 376.37
691.54 700.15
481.86 481.78
455.19 455.19
393.46 395.83
1.005 1.010
CUADRO RESUMEN DE LIQUIDACION FINAL DE OBRA
OBRA
MEJORAMIENTO DE CANAL DE RIEGO HUAMACHUCO
LUGAR Distrito: HUAMACHUCO, Provincia: SANCHEZ CARRION, Region: LA LIBERTAD
8. MONTO NETO FACTURABLE SIN I.G.V. (5+6+7) 303 376.66 270 915.25
SALDOS POR
PAGAR
(S/.)
30 101.70
2 359.71
32 461.41
0.00
32 461.41
0.00
0.00
32 461.41
30 101.70
0.00
32 461.41
5 843.07