CRONOGRAMA DE AVANCE VALORIZADO DE OBRA

PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
01 CONSTRUCCIÓN DE MÓDULOS AULAS 275,105.87 15,436.09 6% 80,615.30 29% 143,756.08 52% 35,298.39 13% 0.00 0%
01.01 ESTRUCTURAS 115,321.09 15,436.09 13% 67,627.80 59% 32,257.20 28% 0.00 0% 0.00 0%
01.01.01 TRABAJOS PRELIMINARES 1,149.98 1,149.98 100% 0.00 0% 0.00 0% 0.00 0% 0.00 0%
01.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 144.47 2.11 304.83 304.83 100% 0% 0% 0% 0%
01.01.01.02 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m2 144.47 2.87 414.63 414.63 100% 0% 0% 0% 0%
01.01.01.03 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 144.47 2.98 430.52 430.52 100% 0% 0% 0% 0%
01.01.02 MOVIMIENTO DE TIERRAS 10,950.05 10,950.05 100% 0.00 0% 0.00 0% 0.00 0% 0.00 0%
01.01.02.01 EXCAVACION PARA VIGAS DE CIMENTACION HASTA =2.30 m DE PROFUNDODAD EN TERRENO NORMAL m3 14.32 51.23 733.61 733.61 100% 0% 0% 0% 0%
01.01.02.02 EXCAVACION PARA VIGAS DE CIMENTACION HASTA 1.55m DE PROFUNDIDAD EN TERRENO NORMAL m3 28.64 51.23 1,467.23 1,467.23 100% 0% 0% 0% 0%
01.01.02.03 EXCAVACION PARA ZAPATAS DE 1.60 DE PROFUNDIDAD EN TERRENO NORMAL m3 9.40 51.23 481.56 481.56 100% 0% 0% 0% 0%
01.01.02.04 EXCAVACION PARA ZAPATAS DE 1.80 DE PROFUNDIDAD EN TERRENO NORMAL m3 10.57 51.23 541.50 541.50 100% 0% 0% 0% 0%
01.01.02.05 EXCAVACION PARA ZAPATAS DE 1.90 DE PROFUNDIDAD EN TERRENO NORMAL m3 45.37 51.23 2,324.31 2,324.31 100% 0% 0% 0% 0%
01.01.02.06 RELLENO Y COMPACTADO CON MATERIAL PROPIO A MANO m3 40.28 31.80 1,280.90 1,280.90 100% 0% 0% 0% 0%
01.01.02.07 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO E=4" m3 2.43 17.10 41.55 41.55 100% 0% 0% 0% 0%
01.01.02.08 NIVELACION INTERIOR Y APISONADO CON EQUIPO m2 152.00 4.93 749.36 749.36 100% 0% 0% 0% 0%
01.01.02.09 ACARREO MATERIAL EXEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30.00 ML m3 81.98 21.35 1,750.27 1,750.27 100% 0% 0% 0% 0%
01.01.02.10 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST.= 2.5 km m3 81.98 19.27 1,579.75 1,579.75 100% 0% 0% 0% 0%
01.01.03 OBRAS DE CONCRETO SIMPLE 19,645.94 1,100.74 6% 16,118.22 82% 2,426.98 12% 0.00 0% 0.00 0%
01.01.03.01 SOLADO DE CONCRETO C:H 1:12, E=4'', PARA ZAPATAS m2 35.96 30.61 1,100.74 1,100.74 100% 0% 0% 0% 0%
01.01.03.02 CONCRETO CICLOPEO f'c=175kg/cm2 + 30 % PG. m3 17.48 285.73 4,994.56 0% 4,994.56 100% 0% 0% 0%
01.01.03.03 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10 + 30% P.G. m3 11.95 209.84 2,507.59 0% 2,507.59 100% 0% 0% 0%
01.01.03.04 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25% P.M. m3 5.32 324.75 1,727.67 0% 1,727.67 100% 0% 0% 0%
01.01.03.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 52.63 50.08 2,635.71 0% 2,635.71 100% 0% 0% 0%
01.01.03.06 FALSO PISO DE CONCRETO 1:12 DE E=4" m2 127.67 33.31 4,252.69 0% 4,252.69 100% 0% 0% 0%
01.01.03.07. COLUMNETAS DE PROTECCION DESAGUE PLUVIAL 339.83 0.00 0% 0.00 0% 339.83 100% 0.00 0% 0.00 0%
01.01.03.07.01 CONCRETO EN COLUMNETA PLUVIAL f'c=175 kg/cm2 m3 0.25 455.60 113.90 0% 0% 113.90 100% 0% 0%
01.01.03.07.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETA PLUVIAL m2 3.50 64.55 225.93 0% 0% 225.93 100% 0% 0%
01.01.03.08 VEREDAS DE CONCRETO 2,087.16 0.00 0% 0.00 0% 2,087.16 100% 0.00 0% 0.00 0%
01.01.03.08.01 VEREDA DE CONCRETO F'C = 140 Kg/cm2 FROTACHADO DE 4" COLOREADO Y BRUÑADO m3 29.05 58.91 1,711.34 0% 0% 1,711.34 100% 0% 0%
01.01.03.08.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDAS m2 6.66 56.43 375.82 0% 0% 375.82 100% 0% 0%
01.01.04 CONCRETO ARMADO 83,575.12 2,235.32 3% 51,509.58 62% 29,830.21 36% 0.00 0% 0.00 0%
01.01.04.01 ZAPATAS 10,507.72 1,417.02 13% 9,090.70 87% 0.00 0% 0.00 0% 0.00 0%
01.01.04.01.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 17.98 426.79 7,673.68 0% 7,673.68 100% 0% 0% 0%
01.01.04.01.02 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 497.20 5.70 2,834.04 1,417.02 50% 1,417.02 50% 0% 0% 0%
01.01.04.02 VIGA DE CIMENTACION 5,905.58 672.84 11% 5,232.7434 89% 0.00 0% 0.00 0% 0.00 0%
01.01.04.02.01 CONCRETO PARA VIGA DE CIMENTACION F'C=210 KG/CM2 m3 3.12 457.12 1,426.21 0% 1,426.21 100% 0% 0% 0%
01.01.04.02.02 ENCOFRADO Y DESENCOFRADO DE VIGA DE CIMENTACION m2 24.92 54.00 1,345.68 672.84 50% 672.84 50% 0% 0% 0%
01.01.04.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 549.77 5.70 3,133.69 0% 3,133.69 100% 0% 0% 0%
01.01.04.03 COLUMNAS 22,450.67 0.00 0% 22,450.67 100% 0.00 0% 0.00 0% 0.00 0%
01.01.04.03.01 CONCRETO PARA COLUMNAS f'c=210 kg/cm2 m3 10.37 552.18 5,726.11 0% 5,726.11 100% 0% 0% 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
01.01.04.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 101.69 64.55 6,564.09 0% 6,564.09 100% 0% 0% 0%
01.01.04.03.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 1,782.54 5.70 10,160.48 0% 10,160.48 100% 0% 0% 0%
01.01.04.04 COLUMNETAS 2,531.27 0.00 0% 2,531.27 100% 0.00 0% 0.00 0% 0.00 0%
01.01.04.04.01 CONCRETO EN COLUMNETAS f'c=175 kg/cm2 m3 1.01 399.18 403.17 0% 403.17 100% 0% 0% 0%
01.01.04.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETAS m2 13.53 64.55 873.36 0% 873.36 100% 0% 0% 0%
01.01.04.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 220.13 5.70 1,254.74 0% 1,254.74 100% 0% 0% 0%
01.01.04.05 VIGAS 15,714.26 0.00 0% 7,171.63 46% 8,542.64 54% 0.00 0% 0.00 0%
01.01.04.05.01 CONCRETO PARA VIGAS f'c=210 kg/cm2 m3 9.70 457.12 4,434.06 0% 0% 4,434.06 100% 0% 0%
01.01.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGAS m2 53.89 76.24 4,108.57 0% 0% 4,108.57 100% 0% 0%
01.01.04.05.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 1,258.18 5.70 7,171.63 0% 7,171.63 100% 0% 0% 0%
01.01.04.06 VIGA CANAL 6,853.89 0.00 0% 4,063.95 59% 2,789.94 41% 0.00 0% 0.00 0%
01.01.04.06.01 CONCRETO PARA VIGA CANAL f'c=210 kg/cm2 m3 2.59 457.12 1,183.94 0% 0% 1,183.94 100% 0% 0%
01.01.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGA CANAL m2 42.13 76.24 3,211.99 0% 1,606.00 50% 1,606.00 50% 0% 0%
01.01.04.06.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 431.22 5.70 2,457.95 0% 2,457.95 100% 0% 0% 0%
01.01.04.07 VIGA CUMBRE 1,425.52 0.00 0% 0.00 0% 1,425.52 100% 0.00 0% 0.00 0%
01.01.04.07.01 CONCRETO EN VIGA CUMBRE F´C=210 kg/cm2 m3 1.28 457.12 585.11 0% 0% 585.11 100% 0% 0%
01.01.04.07.02 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 147.44 5.70 840.41 0% 0% 840.41 100% 0% 0%
01.01.04.08 VIGUETAS DE AMARRE 968.61 0.00 0% 968.61 100% 0.00 0% 0.00 0% 0.00 0%
01.01.04.08.01 CONCRETO EN VIGUETAS DE AMARRE f'c=175 kg/cm2 m3 0.34 400.23 136.08 0% 136.08 100% 0% 0% 0%
01.01.04.08.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGUETAS m2 8.04 76.24 612.97 0% 612.97 100% 0% 0% 0%
01.01.04.08.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 38.52 5.70 219.56 0% 219.56 100% 0% 0% 0%
01.01.04.09 LOSAS ALIGERADAS 17,072.12 0.00 0% 0.00 0% 17,072.12 100% 0.00 0% 0.00 0%
01.01.04.09.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 9.25 448.15 4,145.39 0% 0% 4,145.39 100% 0% 0%
01.01.04.09.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 104.06 56.56 5,885.63 0% 0% 5,885.63 100% 0% 0%
01.01.04.09.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 601.31 5.70 3,427.47 0% 0% 3,427.47 100% 0% 0%
01.01.04.09.04 LADRILLO HUECO DE ARCILLA h=12 cm PARA TECHO ALIGERADO und 987.33 3.66 3,613.63 0% 0% 3,613.63 100% 0% 0%
01.01.04.10 VARIOS 145.46 145.46 100% 0.00 0% 0.00 0% 0.00 0% 0.00 0%
01.01.04.10.01 CAMA DE ARENA e=4" PARA VIGA DE CIMENTACION m2 10.48 13.88 145.46 145.46 100% 0% 0% 0% 0%
01.02 ARQUITECTURA 141,382.97 0.00 0% 12,987.50 9% 98,145.40 69% 30,250.07 21% 0.00 0%
01.02.01 MUROS Y TABIQUERIA DE ALBAÑILERIA 16,409.86 0.00 0% 12,987.50 79% 3,422.36 21% 0.00 0% 0.00 0%
01.02.01.01 MURO DE LADRILLO 18 HUECOS DE SOGA DE 9 x 12.5 x 23 cm. C:A-1:4 x 1.5 CM. m2 24.31 140.78 3,422.36 0% 0% 3,422.36 100% 0% 0%
01.02.01.02 MURO DE LADRILLO 18 HUECOS DE CABEZA DE 9 x 12.5 x 23 cm. C:A-1:4 x 1.5 CM. m2 55.45 234.22 12,987.50 0% 12,987.50 100% 0% 0% 0%
01.02.02 REVOQUES ENLUCIDOS Y MOLDURAS 38,136.79 0.00 0% 0.00 0% 38,136.79 100% 0.00 0% 0.00 0%
01.02.02.01 TARRAJEO EN MUROS INT. MEZ. C:A-1:5 E=2.00 CM ( INCLUIDO VIGUETAS Y COLUMNETAS) m2 215.00 16.71 3,592.65 0% 0% 3,592.65 100% 0% 0%
01.02.02.02 TARRAJEO BRUÑADO EN MUROS EXTERIORES C:A-1:5 e=2.00cm. ( INCLUIDO VIGUETAS Y COLUMNETAS) m2 76.02 19.61 1,490.75 0% 0% 1,490.75 100% 0% 0%
01.02.02.03 TARRAJEO EN COLUMNAS CON C:A-1:5 E=2.00 CM m2 57.44 29.66 1,703.67 0% 0% 1,703.67 100% 0% 0%
01.02.02.04 TARRAJEO EN VIGAS CON C:A-1:5 E=2.00 CM m2 797.65 32.40 25,843.86 0% 0% 25,843.86 100% 0% 0%
01.02.02.05 TARRAJEO CON IMPERMEABILIZANTES EN VIGA CANAL m2 70.37 35.92 2,527.69 0% 0% 2,527.69 100% 0% 0%
01.02.02.06 VESTIDURA DE DERRAMES CON C:A-1:5 E=2.00 CM ml 80.14 11.99 960.88 0% 0% 960.88 100% 0% 0%
01.02.02.07 BRUÑAS DE 1" ml 263.01 7.67 2,017.29 0% 0% 2,017.29 100% 0% 0%
01.02.03 CIELORRASOS 18,838.48 0.00 0% 0.00 0% 18,838.48 100% 0.00 0% 0.00 0%
01.02.03.01 TARRAJEO DE CIELORRASOS CON MEZCLA C:A-1:5 CINTAS e=1.5cm. m2 7.67 47.52 364.48 0% 0% 364.48 100% 0% 0%
01.02.03.02 CIELORRASOS SUSPENDIDO DE BALDOSA ACUSTICA m2 131.31 140.69 18,474.00 0% 0% 18,474.00 100% 0% 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
01.02.04 PISOS Y PAVIMENTOS 20,703.77 0.00 0% 0.00 0% 0.00 0% 20,703.77 100% 0.00 0%
01.02.04.01 CONTRA PISO DE E=2" m2 19.70 37.19 732.64 0% 0% 0% 732.64 100% 0%
01.02.04.02 PISO DE MADERA MACHIHEMBRADA DE 1"x4"x 10' m2 131.31 125.52 16,482.03 0% 0% 0% 16,482.03 100% 0%
01.02.04.03 DURMIENTES DE MADERA TORNILLO DE 2"x 3"x10´ ml 310.35 9.73 3,019.71 0% 0% 0% 3,019.71 100% 0%
01.02.04.04 PISO DE ALFOMBRA PELO CORTADO NYLON m2 6.75 69.54 469.40 0% 0% 0% 469.40 100% 0%
01.02.05 ZOCALOS Y CONTRAZOCALOS 1,652.02 0.00 0% 0.00 0% 0.00 0% 1,652.02 100% 0.00 0%
01.02.05.01 ZOCALO DE CERAMICO TIPO ARIZONA CARAMELO 20x30 CM EN PARED m2 15.98 83.95 1,341.52 0% 0% 0% 1,341.52 100% 0%
01.02.05.02 ZOCALO DE CEMENTO PULIDO H=0.40 EN PARED EXTERIOR m2 15.85 19.59 310.50 0% 0% 0% 310.50 100% 0%
01.02.06 CARPINTERIA DE MADERA Y MELAMINA 2,032.80 0.00 0% 0.00 0% 0.00 0% 2,032.80 100% 0%
01.02.06.01 PUERTA DE CONTRAPLACADA CEDRO -TRIPLAY SEGÚN DISEÑO INCL. INSTALACION m2 9.24 220.00 2,032.80 0% 0% 0% 2,032.80 100% 0%
01.02.07 CARPINTERIA DE ALUMINIO Y MELAMINE 2,921.60 0.00 0% 0.00 0% 0.00 0% 2,921.60 100% 0.00 0%
01.02.07.01 VENTANA SISTEMA PROYECTANTE DE VIDRIO TEMPLEX DE 6 mm SEGUN DISEÑO INCL. INST. m2 18.26 160.00 2,921.60 0% 0% 0% 2,921.60 100% 0%
01.02.08 CERRAJERIA 694.26 0.00 0% 0.00 0% 0.00 0% 694.26 100% 0.00 0%
01.02.08.01 CHAPA DE PARCHE 3 GOLPES pza 6.00 115.71 694.26 0% 0% 0% 694.26 100% 0%
01.02.09 PINTURA 29,473.92 0.00 0% 0.00 0% 27,323.57 93% 2,150.35 7% 0.00 0%
01.02.09.01 PINTURA EN MUROS INTERIORES C/ LATEX SATINADO LAVABLE m2 429.64 10.01 4,300.70 0% 0% 2,150.35 50% 2,150.35 50% 0%
01.02.09.02 PINTURA EN MUROS EXTERIORES C/ LATEX SATINADO LAVABLE m2 113.43 11.50 1,304.45 0% 0% 1,304.45 100% 0% 0%
01.02.09.03 PINTURA EN COLUMNAS C/ LATEX SATINADO LAVABLE m2 113.23 10.00 1,132.30 0% 0% 1,132.30 100% 0% 0%
01.02.09.04 PINTURA EN VIGAS C/ LATEX SATINADO LAVABLE m2 1,595.29 11.13 17,755.58 0% 0% 17,755.58 100% 0% 0%
01.02.09.05 PINTURA EN DERRAMES C/ LATEX SATINADO LAVABLE ml 160.28 1.62 259.65 0% 0% 259.65 100% 0% 0%
01.02.09.06 PINTURA EN BRUÑAS C/LATEX SATINADO LAVABLE ml 526.02 1.31 689.09 0% 0% 689.09 100% 0% 0%
01.02.09.07 PINTURA EN CIELO RASO C/ LATEX SATINADO LAVABLE m2 262.62 10.84 2,846.80 0% 0% 2,846.80 100% 0% 0%
01.02.09.08 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 48.76 24.31 1,185.36 0% 0% 1,185.36 100% 0% 0%
01.02.10 CUBIERTAS 9,765.28 0.00 0% 0.00 0% 9,765.28 100% 0.00 0% 0.00 0%
01.02.10.01 CORREA DE MADERA TORNILLO DE 2" x 1" x 10' ml 230.72 20.15 4,649.01 0% 0% 4,649.01 100% 0% 0%
01.02.10.02 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 54.00 62.89 3,396.06 0% 0% 3,396.06 100% 0% 0%
01.02.10.03 CUMBRERA ARTICULADA TIPO TEJA ANDINA ml 18.40 93.49 1,720.22 0% 0% 1,720.22 100% 0% 0%
01.02.11 VARIOS 754.18 0.00 0% 0.00 0% 658.92 87% 95.26 13% 0.00 0%
01.02.11.01 JUNTA DE CONSTRUCCION CON TEKNOPORT E=1" m2 38.00 17.34 658.92 0% 0% 658.92 100% 0% 0%
01.02.11.02 LIMPIEZA FINAL DE OBRA m2 117.61 0.81 95.26 0% 0% 0% 95.26 100% 0%
01.03 INSTALACIONES ELECTRICAS 18,401.80 0.00 0% 0.00 0% 13,353.48 73% 5,048.32 27% 0.00 0%
01.03.01 SALIDA PARA ELECTRICIDAD Y TOMACORRIENTES 4,749.61 0.00 0% 0.00 0% 4,749.61 100% 0.00 0% 0.00 0%
01.03.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 27.00 65.77 1,775.79 0% 0% 1,775.79 100% 0% 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
01.03.01.02 SALIDA PARA INTERRUPTOR SIMPLE pto 1.00 92.90 92.90 0% 0% 92.90 100% 0% 0%
01.03.01.03 SALIDA PARA INTERRUPTOR TRIPLE pto 5.00 81.90 409.50 0% 0% 409.50 100% 0% 0%
01.03.01.04 SALIDA PARA TOMACORRIENTE DOBLE CON LINEA DE TIERRA (H=0.40) pto 38.00 50.78 1,929.64 0% 0% 1,929.64 100% 0% 0%
01.03.01.05 SALIDA EN PARED PARA LUZ DE EMERGENCIA (H=2.20) pto 4.00 65.77 263.08 0% 0% 263.08 100% 0% 0%
01.03.01.06 SALIDA PARA DETECTOR DE HUMO pto 3.00 92.90 278.70 0% 0% 278.70 100% 0% 0%
01.03.02 CANALIZACION Y/O TUBERIA 4,230.44 0.00 0% 0.00 0% 4,230.44 100% 0.00 0% 0.00 0%
01.03.02.01 TUBO Ø 20 mm PVC-SEL (ALUMBRADO) ml 103.02 12.94 1,333.08 0% 0% 1,333.08 100% 0% 0%
01.03.02.02 TUBO Ø 20 mm PVC-SEL (INTERRUPTOR) ml 29.09 12.94 376.42 0% 0% 376.42 100% 0% 0%
01.03.02.03 TUBO Ø 20 mm PVC-SEL (TOMACORRIENTE) ml 84.89 12.94 1,098.48 0% 0% 1,098.48 100% 0% 0%
01.03.02.04 CURVAS DE 90º DE PVC-SEL 20mm (ILUMINACIÓN) und 76.00 8.69 660.44 0% 0% 660.44 100% 0% 0%
01.03.02.05 CURVAS DE 90º DE PVC-SEL 20mm (TOMACORRIENTE) und 76.00 8.69 660.44 0% 0% 660.44 100% 0% 0%
01.03.02.06 TUBO Ø 20 mm PVC-SAP(DETECTOR DE HUMO) ml 7.85 12.94 101.58 0% 0% 101.58 100% 0% 0%
01.03.03 CONDUCTORES Y/O CABLES 2,245.57 0.00 0% 0.00 0% 2,245.57 100% 0.00 0% 0.00 0%
01.03.03.01 CONDUCTOR LSOH 2.5 mm2 ml 326.88 3.86 1,261.76 0% 0% 1,261.76 100% 0% 0%
01.03.03.02 CONDUCTOR LSOH 4.0 mm2 ml 200.37 4.91 983.82 0% 0% 983.82 100% 0% 0%
01.03.04 TABLEROS Y ACCESORIOS 1,789.34 0.00 0% 0.00 0% 1,789.34 100% 0.00 0% 0.00 0%
01.03.04.01 TABLEROS DE DISTRIBUCION 427.28 0.00 0% 0.00 0% 427.28 100% 0.00 0% 0.00 0%
01.03.04.01.01 TABLERO DE DISTRIBUCION PARA LLAVES TIPO RIEL 12 POLOS und 2.00 213.64 427.28 0% 0% 427.28 100% 0% 0%
01.03.04.02 LLAVES DE INTERRUPCION 1,362.06 0.00 0% 0.00 0% 1,362.06 100% 0.00 0% 0.00 0%
01.03.04.02.01 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 15 A pza 9.00 78.17 703.53 0% 0% 703.53 100% 0% 0%
01.03.04.02.02 INTERRUPTOR DIFERENCIAL 2x15/30mA pza 9.00 73.17 658.53 0% 0% 658.53 100% 0% 0%
01.03.05 CAJAS DE PASE 338.52 0.00 0% 0.00 0% 338.52 100% 0.00 0% 0.00 0%
01.03.05.01 CAJA DE PASE 100 x 100 x 40 und 21.00 16.12 338.52 0% 0% 338.52 100% 0% 0%
01.03.06 ARTEFACTOS ELECTRICOS 5,048.32 0.00 0% 0.00 0% 0.00 0% 5,048.32 100% 0.00 0%
01.03.05.01 FLUORESCENTE RECTO 4 x 18w CON PANTALLA TIPO PERCIANA COLGANTE INCL. ACCESORIOS und 18.00 88.86 1,599.48 0% 0% 0% 1,599.48 100% 0%
01.03.05.02 FLUORECENTE CIRCULAR DE 32 WATT (INCLUYE EQUIPO COMPLETO) und 9.00 70.61 635.49 0% 0% 0% 635.49 100% 0%
01.03.05.03 LUZ DE EMERGENCIA und 4.00 133.06 532.24 0% 0% 0% 532.24 100% 0%
01.03.05.04 MODEN WIFI pza 3.00 216.26 648.78 0% 0% 0% 648.78 100% 0%
01.03.05.05 RACK PARA MODEM pza 3.00 44.17 132.51 0% 0% 0% 132.51 100% 0%
01.03.05.06 TAPA PROTECCION PARA TOMACORRIENTES pza 38.00 4.56 173.28 0% 0% 0% 173.28 100% 0%
01.03.05.07 DETECTOR DE HUMO und 3.00 122.86 368.58 0% 0% 0% 368.58 100% 0%
01.03.05.08 PANEL DEL SISTEMA CONTRA INCENDIOS CON ALARMA und 3.00 319.32 957.96 0% 0% 0% 957.96 100% 0%
02 CONSTRUCCIÓN DE SS.HH. 81,329.08 18,317.00 23% 60,132.86 74% 2,879.22 4% 0.00 0% 0.00 0%
02.01 ESTRUCTURAS 32,340.02 18,317.00 57% 14,023.02 43% 0.00 0% 0.00 0% 0.00 0%
02.01.01 TRABAJOS PRELIMINARES 144.84 144.84 100% 0.00 0% 0.00 0% 0.00 0% 0.00 0%
02.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 35.5 0.22 7.81 7.81 100% 0% 0% 0% 0%
02.01.01.02 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m2 35.5 2.56 90.88 90.88 100% 0% 0% 0% 0%
02.01.01.03 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 35.5 1.30 46.15 46.15 100% 0% 0% 0% 0%
02.01.02 MOVIMIENTO DE TIERRAS 4,338.20 4,338.20 100% 0.00 0% 0.00 0% 0.00 0% 0.00 0%
02.01.02.01 EXCAVACION PARA VIGAS DE CIMENTACION HASTA =2.30 m DE PROFUNDODAD EN TERRENO NORMAL m3 24.08 51.23 1,233.62 1,233.62 100% 0% 0% 0% 0%
02.01.02.02 EXCAVACION PARA CIMIENTOS HASTA 0.70m DE PROFUNDIDAD EN TERRENO NORMAL m3 3.09 101.29 312.99 312.99 100% 0% 0% 0% 0%
02.01.02.03 EXCAVACION PARA ZAPATAS DE 1.60 DE PROFUNDIDAD EN TERRENO NORMAL m3 9.98 51.23 511.28 511.28 100% 0% 0% 0% 0%
02.01.02.04 EXCAVACION PARA ZAPATAS DE 1.90 DE PROFUNDIDAD EN TERRENO NORMAL m3 7.44 51.23 381.15 381.15 100% 0% 0% 0% 0%
02.01.02.05 EXCAVACION PARA ZAPATAS DE 2.30 DE PROFUNDIDAD EN TERRENO NORMAL m3 4.5 51.23 230.54 230.54 100% 0% 0% 0% 0%
02.01.02.06 RELLENO Y COMPACTADO CON MATERIAL PROPIO A MANO m3 11.89 31.80 378.10 378.10 100% 0% 0% 0% 0%
02.01.02.07 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO E=4" m3 0.56 17.10 9.58 9.58 100% 0% 0% 0% 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
02.01.02.08 NIVELACION INTERIOR Y APISONADO CON EQUIPO m2 32.31 4.93 159.29 159.29 100% 0% 0% 0% 0%
02.01.02.09 ACARREO MATERIAL EXEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30.00 ML m3 40.16 21.35 857.42 857.42 100% 0% 0% 0% 0%
02.01.02.10 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST.= 2.5 km m3 40.16 6.58 264.25 264.25 100% 0% 0% 0% 0%
02.01.03 OBRAS DE CONCRETO SIMPLE 6,943.29 1,092.66 16% 5,850.63 84% 0.00 0% 0.00 0% 0.00 0%
02.01.03.01 SOLADO DE CONCRETO C:H 1:12, E=4'', PARA ZAPATAS m2 11.75 25.39 298.33 298.33 100% 0% 0% 0% 0%
02.01.03.02 CONCRETO CICLOPEO f'c=175kg/cm2 + 30 % PG. m3 5.56 285.73 1,588.66 794.33 50% 794.33 50% 0% 0% 0%
02.01.03.03 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10 + 30% P.G. m3 5.15 258.27 1,330.09 0% 1,330.09 100% 0% 0% 0%
02.01.03.04 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25% P.M. m3 3.96 324.75 1,286.01 0% 1,286.01 100% 0% 0% 0%
02.01.03.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 19.78 50.08 990.58 0% 990.58 100% 0% 0% 0%
02.01.03.06 FALSO PISO DE CONCRETO 1:12 DE E=4" m2 26.69 33.31 889.04 0% 889.04 100% 0% 0% 0%
02.01.03.07 COLUMNETAS DE PROTECCION DESAGUE PLUVIAL 172.19 0.00 0% 172.19 100% 0.00 0% 0.00 0% 0.00 0%
02.01.03.07.01 CONCRETO EN COLUMNETA PLUVIAL f'c=175 kg/cm2 m3 0.13 455.60 59.23 0% 59.23 100% 0% 0% 0%
02.01.03.07.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETA PLUVIAL m2 1.75 64.55 112.96 0% 112.96 100% 0% 0% 0%
02.01.03.08 VEREDAS DE CONCRETO 388.38 0.00 0% 388.38 100% 0.00 0% 0.00 0% 0.00 0%
02.01.03.08.01 VEREDA DE CONCRETO F'C = 140 Kg/cm2 FROTACHADO DE 4" COLOREADO Y BRUÑADO m3 5.52 58.91 325.18 0% 325.18 100% 0% 0% 0%
02.01.03.08.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDAS m2 1.12 56.43 63.20 0% 63.20 100% 0% 0% 0%
02.01.04 CONCRETO ARMADO 20,913.68 12,741.30 61% 8,172.39 39% 0.00 0% 0.00 0% 0.00 0%
02.01.04.01 ZAPATAS 3,543.68 3,543.68 100% 0.00 0% 0.00 0% 0.00 0% 0.00 0%
02.01.04.01.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 5.87 426.79 2,505.26 2,505.26 100% 0% 0% 0% 0%
02.01.04.01.02 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 182.18 5.70 1,038.43 1,038.43 100% 0% 0% 0% 0%
02.01.04.02 VIGA DE CIMENTACION 594.61 594.61 100% 0.00 0% 0.00 0% 0.00 0% 0.00 0%
02.01.04.02.01 CONCRETO PARA VIGA DE CIMENTACION F'C=210 KG/CM2 m3 0.23 457.12 105.14 105.14 100% 0% 0% 0% 0%
02.01.04.02.02 ENCOFRADO Y DESENCOFRADO DE VIGA DE CIMENTACION m2 1.82 54.00 98.28 98.28 100% 0% 0% 0% 0%
02.01.04.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 68.63 5.70 391.19 391.19 100% 0% 0% 0% 0%
02.01.04.03 COLUMNAS 5,949.48 3,482.08 59% 2,467.40 41% 0.00 0% 0.00 0% 0.00 0%
02.01.04.03.01 CONCRETO PARA COLUMNAS f'c=210 kg/cm2 m3 2.48 552.18 1,369.41 0% 1,369.41 100% 0% 0% 0%
02.01.04.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 34.02 64.55 2,195.99 1,098.00 50% 1,098.00 50% 0% 0% 0%
02.01.04.03.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 418.26 5.70 2,384.08 2,384.08 100% 0% 0% 0% 0%
02.01.04.04 COLUMNETAS 1,060.39 1,060.39 100% 0.00 0% 0.00 0% 0.00 0% 0.00 0%
02.01.04.04.01 CONCRETO EN COLUMNETAS f'c=175 kg/cm2 m3 0.42 399.18 167.66 167.66 100% 0% 0% 0% 0%
02.01.04.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETAS m2 5.61 64.55 362.13 362.13 100% 0% 0% 0% 0%
02.01.04.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 93.09 5.70 530.61 530.61 100% 0% 0% 0% 0%
02.01.04.05 VIGAS 4,213.22 0.00 0% 4,213.22 100% 0.00 0% 0.00 0% 0.00 0%
02.01.04.05.01 CONCRETO PARA VIGAS f'c=210 kg/cm2 m3 2.53 457.12 1,156.51 0% 1,156.51 100% 0% 0% 0%
02.01.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGAS m2 13.94 76.24 1,062.79 0% 1,062.79 100% 0% 0% 0%
02.01.04.05.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 349.81 5.70 1,993.92 0% 1,993.92 100% 0% 0% 0%
02.01.04.06 VIGA CANAL 1,460.34 0.00 0% 1,460.34 100% 0.00 0% 0.00 0% 0.00 0%
02.01.04.06.01 CONCRETO PARA VIGA CANAL f'c=210 kg/cm2 m3 0.49 457.12 223.99 0% 223.99 100% 0% 0% 0%
02.01.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGA CANAL m2 9.73 76.24 741.82 0% 741.82 100% 0% 0% 0%
02.01.04.06.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 86.76 5.70 494.53 0% 494.53 100% 0% 0% 0%
02.01.04.07 VIGUETAS DE AMARRE 62.86 31.43 50% 31.43 50% 0.00 0% 0.00 0% 0.00 0%
02.01.04.07.01 CONCRETO EN VIGUETAS DE AMARRE f'c=175 kg/cm2 m3 0.04 400.23 16.01 8.00 50% 8.00 50% 0% 0% 0%
02.01.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGUETAS m2 0.16 76.24 12.20 6.10 50% 6.10 50% 0% 0% 0%
02.01.04.07.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 6.08 5.70 34.66 17.33 50% 17.33 50% 0% 0% 0%
02.01.04.08 LOSAS ALIGERADAS 4,029.10 4,029.10 100% 0.00 0% 0.00 0% 0.00 0% 0.00 0%
02.01.04.08.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 2.13 448.15 954.56 954.56 100% 0% 0% 0% 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
02.01.04.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 25.11 56.56 1,420.22 1,420.22 100% 0% 0% 0% 0%
02.01.04.08.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 144.32 5.70 822.62 822.62 100% 0% 0% 0% 0%
02.01.04.08.04 LADRILLO HUECO DE ARCILLA h=12 cm PARA TECHO ALIGERADO und 227.24 3.66 831.70 831.70 100% 0% 0% 0% 0%
02.02 ARQUITECTURA 36,469.98 0.00 0% 33,590.76 92% 2,879.22 8% 0.00 0% 0.00 0%
02.02.01 MUROS Y TABIQUERIA DE ALBAÑILERIA 7,789.23 0.00 0% 7,789.23 100% 0.00 0% 0.00 0% 0.00 0%
02.02.01.01 MURO DE LADRILLO 18 HUECOS DE CABEZA DE 9 x 12.5 x 23 cm. C:A-1:4 x 1.5 CM. m2 24.31 133.42 3,243.44 0% 3,243.44 100% 0% 0% 0%
02.02.01.02 MURO DE LADRILLO 18 HUECOS DE SOGA DE 9 x 12.5 x 23 cm. C:A-1:4 x 1.5 CM. m2 55.45 81.98 4,545.79 0% 4,545.79 100% 0% 0% 0%
02.02.02 REVOQUES ENLUCIDOS Y MOLDURAS 3,432.40 0.00 0% 3,432.40 100% 0.00 0% 0.00 0% 0.00 0%
02.02.02.01 TARRAJEO PRIMARIO RAYADO MEZC. C:A .1:5 E=1.5CM INCL. VESTIDURA DE ARISTAS m2 64.55 20.23 1,305.85 0% 1,305.85 100% 0% 0% 0%
02.02.02.02 TARRAJEO EN MUROS INT. MEZ. C:A-1:5 E=2.00 CM ( INCLUIDO VIGUETAS Y COLUMNETAS) m2 40.46 16.71 676.09 0% 676.09 100% 0% 0% 0%
02.02.02.03 TARRAJEO BRUÑADO EN MUROS EXTERIORES C:A-1:5 e=2.00cm. ( INCLUIDO VIGUETAS Y COLUMNETAS) m2 5.02 19.61 98.44 0% 98.44 100% 0% 0% 0%
02.02.02.04 TARRAJEO EN COLUMNAS CON C:A-1:5 E=2.00 CM m2 8.39 29.66 248.85 0% 248.85 100% 0% 0% 0%
02.02.02.05 TARRAJEO EN VIGAS CON C:A-1:5 E=2.00 CM m2 3.60 32.40 116.64 0% 116.64 100% 0% 0% 0%
02.02.02.06 TARRAJEO CON IMPERMEABILIZANTES EN VIGA CANAL m2 15.86 35.92 569.69 0% 569.69 100% 0% 0% 0%
02.02.02.07 VESTIDURA DE DERRAMES CON C:A-1:5 E=2.00 CM ml 29.86 11.99 358.02 0% 358.02 100% 0% 0% 0%
02.02.02.08 BRUÑAS DE 1" ml 7.67 7.67 58.83 0% 58.83 100% 0% 0% 0%
02.02.03 CIELORRASOS 3,833.48 0.00 0% 3,833.48 100% 0.00 0% 0.00 0% 0.00 0%
02.02.03.01 TARRAJEO DE CIELORRASOS CON MEZCLA C:A-1:5 CINTAS e=1.5cm. m2 1.74 47.52 82.68 0% 82.68 100% 0% 0% 0%
02.02.03.02 CIELORRASOS SUSPENDIDO DE BALDOSA ACUSTICA m2 26.66 140.69 3,750.80 0% 3,750.80 100% 0% 0% 0%
02.02.04 PISOS Y PAVIMENTOS 2,823.65 0.00 0% 2,823.65 100% 0.00 0% 0.00 0% 0.00 0%
02.02.04.01 CONTRA PISO DE E=2" m2 26.66 37.19 991.49 0% 991.49 100% 0% 0% 0%
02.02.04.02 PISO DE CERAMICO ANTIDESLIZANTE 0.30 X 0.30 M. EN INTERIORES m2 26.40 69.40 1,832.16 0% 1,832.16 100% 0% 0% 0%
02.02.05 ZOCALOS Y CONTRAZOCALOS 5,741.01 0.00 0% 5,741.01 100% 0.00 0% 0.00 0% 0.00 0%
02.02.05.01 ZOCALO DE MADERA CEDRO 1/2" ml 0.78 29.66 23.13 0% 23.13 100% 0% 0% 0%
02.02.05.02 ZOCALO DE CERAMICO TIPO ARIZONA CARAMELO 20x30 CM EN PARED m2 61.90 83.95 5,196.51 0% 5,196.51 100% 0% 0% 0%
02.02.05.03 CONTRAZOCALO DE CERAMICO TIPO ARIZONA CARAMELO 20x30 CM EN PARED m2 6.88 75.78 521.37 0% 521.37 100% 0% 0% 0%
02.02.06 ENCHAPES 1,605.95 0.00 0% 1,605.95 100% 0.00 0% 0.00 0% 0.00 0%
02.02.06.01 ENCHAPE EN MESA DE CONCRETO CON CERAMICO 0.20 X 0.30M. m2 10.68 150.37 1,605.95 0% 1,605.95 100% 0% 0% 0%
02.02.07 CARPINTERIA DE MADERA Y MELAMINA 1,775.44 0.00 0% 1,775.44 100% 0.00 0% 0.00 0% 0.00 0%
02.02.07.01 PUERTA CONTRAPLACADA - MELAMINE SEGÚN DISEÑO INCL. INSTALACION INSTALACION m2 6.16 288.22 1,775.44 0% 1,775.44 100% 0% 0% 0%
02.02.08 CARPINTERIA DE ALUMINIO Y MELAMINE 3,164.77 0.00 0% 1,582.39 50% 1,582.39 50% 0.00 0% 0.00 0%
02.02.08.01 PUERTA DE ALUMINIO Y MELAMINA CON MARCO Y JAMBA DE ALUMINIO SEGUN DISEÑO INCL. INSTALACION m2 6.80 271.29 1,844.77 0% 922.39 50% 922.39 50% 0% 0%
02.02.08.02 TABIQUERIA DE MELAMINA CON ESTRUCTURA DE ALUMINIO SEGUN DISEÑO m2 10.32 60.00 619.20 0% 309.60 50% 309.60 50% 0% 0%
02.02.08.03 VENTANA SISTEMA PROYECTANTE DE VIDRIO TEMPLEX DE 6 mm SEGUN DISEÑO INCL. INST. m2 4.38 160.00 700.80 0% 350.40 50% 350.40 50% 0% 0%
02.02.09 CERRAJERIA 784.52 0.00 0% 0.00 0% 784.52 100% 0.00 0% 0.00 0%
02.02.09.01 BISAGRAS ALUMINIZADAS TIPO CAPUCHINA DE 3 1/2"X 3 1/2" pza 12.00 20.12 241.44 0% 0% 241.44 100% 0% 0%
02.02.09.02 CHAPA PERILLA LIVIANA TIPO GLOBO DE BRONCE pza 5.00 70.44 352.20 0% 0% 352.20 100% 0% 0%
02.02.09.03 CHAPA DE PARCHE 2 GOLPES pza 2.00 95.44 190.88 0% 0% 190.88 100% 0% 0%
02.02.10 PINTURA 1,707.67 0.00 0% 1,254.05 73% 453.62 27% 0.00 0% 0.00 0%
02.02.10.01 PINTURA EN MUROS INTERIORES C/ LATEX SATINADO LAVABLE m2 38.19 10.01 382.28 0% 382.28 100% 0% 0% 0%
02.02.10.02 PINTURA EN MUROS EXTERIORES C/ LATEX SATINADO LAVABLE m2 33.09 11.50 380.54 0% 380.54 100% 0% 0% 0%
02.02.10.03 PINTURA EN COLUMNAS C/ LATEX SATINADO LAVABLE m2 25.44 10.00 254.40 0% 254.40 100% 0% 0% 0%
02.02.10.04 PINTURA EN VIGAS C/ LATEX SATINADO LAVABLE m2 2.66 11.13 29.61 0% 29.61 100% 0% 0% 0%
02.02.10.05 PINTURA EN DERRAMES C/ LATEX SATINADO LAVABLE ml 49.32 1.62 79.90 0% 79.90 100% 0% 0% 0%
02.02.10.06 PINTURA EN BRUÑAS C/LATEX SATINADO LAVABLE ml 97.20 1.31 127.33 0% 127.33 100% 0% 0% 0%
02.02.10.07 PINTURA EN CIELO RASO C/ LATEX SATINADO LAVABLE m2 18.77 10.84 203.47 0% 0% 203.47 100% 0% 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
02.02.10.08 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 10.29 24.31 250.15 0% 0% 250.15 100% 0% 0%
02.02.11 CUBIERTAS 3,680.34 0.00 0% 3,680.34 100% 0.00 0% 0.00 0% 0.00 0%
02.02.11.01 CORREA DE MADERA TORNILLO DE 2" x 1" x 10' ml 56.00 13.47 754.32 0% 754.32 100% 0% 0% 0%
02.02.11.02 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 36.12 62.89 2,271.59 0% 2,271.59 100% 0% 0% 0%
02.02.11.03 CUMBRERA ARTICULADA TIPO TEJA ANDINA ml 7.00 93.49 654.43 0% 654.43 100% 0% 0% 0%
02.02.12 VARIOS 131.52 0.00 0% 72.83 55% 58.70 45% 0.00 0% 0.00 0%
02.02.12.01 JUNTA DE CONSTRUCCION CON TEKNOPORT E=1" m2 4.20 17.34 72.83 0% 72.83 100% 0% 0% 0%
02.02.12.02 LIMPIEZA FINAL DE OBRA m2 31.90 1.84 58.70 0% 0% 58.70 100% 0% 0%
02.03 INSTALACIONES ELECTRICAS 2,810.06 0.00 0% 2,810.06 100% 0.00 0% 0.00 0% 0.00 0%
02.03.01 SALIDA PARA ELECTRICIDAD Y TOMACORRIENTES 1,086.35 0.00 0% 1,086.35 100% 0.00 0% 0.00 0% 0.00 0%
02.03.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 7.00 65.77 460.39 0% 460.39 100% 0% 0% 0%
02.03.01.02 SALIDA PARA INTERRUPTOR SIMPLE pto 1.00 92.90 92.90 0% 92.90 100% 0% 0% 0%
02.03.01.03 SALIDA PARA INTERRUPTOR TRIPLE pto 3.00 81.90 245.70 0% 245.70 100% 0% 0% 0%
02.03.01.04 SALIDA PARA TOMACORRIENTE DOBLE CON LINEA DE TIERRA (H=0.40) pto 2.00 50.78 101.56 0% 101.56 100% 0% 0% 0%
02.03.01.05 SALIDA PARA DETECTOR DE HUMO pto 2.00 92.90 185.80 0% 185.80 100% 0% 0% 0%
02.03.02 CANALIZACION Y/O TUBERIA 819.87 0.00 0% 819.87 100% 0.00 0% 0.00 0% 0.00 0%
02.03.02.01 TUBO Ø 20 mm PVC-SEL (ALUMBRADO) ml 17.09 12.94 221.14 0% 221.14 100% 0% 0% 0%
02.03.02.02 TUBO Ø 20 mm PVC-SEL (INTERRUPTOR) ml 15.01 12.94 194.23 0% 194.23 100% 0% 0% 0%
02.03.02.03 TUBO Ø 20 mm PVC-SEL (TOMACORRIENTE) ml 6.62 12.94 85.66 0% 85.66 100% 0% 0% 0%
02.03.02.04 CURVAS DE 90º DE PVC-SEL 20mm (ILUMINACIÓN) und 22.00 8.69 191.18 0% 191.18 100% 0% 0% 0%
02.03.02.05 CURVAS DE 90º DE PVC-SEL 20mm (TOMACORRIENTE) und 3.00 8.69 26.07 0% 26.07 100% 0% 0% 0%
02.03.02.06 TUBO Ø 20 mm PVC-SAP(DETECTOR DE HUMO) ml 7.85 12.94 101.58 0% 101.58 100% 0% 0% 0%
02.03.03 CONDUCTORES Y/O CABLES 400.46 0.00 0% 400.46 100% 0.00 0% 0.00 0% 0.00 0%
02.03.03.01 CONDUCTOR LSOH 2.5 mm2 ml 78.47 3.86 302.89 0% 302.89 100% 0% 0% 0%
02.03.03.02 CONDUCTOR LSOH 4.0 mm2 ml 19.87 4.91 97.56 0% 97.56 100% 0% 0% 0%
02.03.04 ARTEFACTOS ELECTRICOS 503.39 0.00 0% 503.39 100% 0.00 0% 0.00 0% 0.00 0%
02.03.04.01 FLUORECENTE CIRCULAR DE 32 WATT (INCLUYE EQUIPO COMPLETO) und 7.00 70.61 494.27 0% 494.27 100% 0% 0% 0%
02.03.04.02 TAPA PROTECCION PARA TOMACORRIENTES pza 2.00 4.56 9.12 0% 9.12 100% 0% 0% 0%
02.04 INSTALACIONES SANITARIAS 9,709.02 0.00 0% 9,709.02 100% 0.00 0% 0.00 0% 0.00 0%
02.04.01 SISTEMA DE DESAGUE 7,993.67 0.00 0% 7,993.67 100% 0.00 0% 0.00 0% 0.00 0%
02.04.01.01 APARATOS Y ACCESORIOS SANITARIOS 3,781.88 0.00 0% 3,781.88 100% 0.00 0% 0.00 0% 0.00 0%
02.04.01.01.01 INODORO TANQUE BAJO BLANCO MODELO BABY FRESH und 5.00 342.94 1,714.70 0% 1,714.70 100% 0% 0% 0%
02.04.01.01.02 LAVATORIO DE CERAMICO OVALIN BABY TREBOL SONET und 5.00 262.94 1,314.70 0% 1,314.70 100% 0% 0% 0%
02.04.01.01.03 URINARIO DE CERAMICO CADET BLANCO und 2.00 182.94 365.88 0% 365.88 100% 0% 0% 0%
02.04.01.01.04 PORTA PAPEL DE LOZA C/BLANCO pza 5.00 47.29 236.45 0% 236.45 100% 0% 0% 0%
02.04.01.01.05 PAPELERA DE PLASTICO TAPA CON VENTANA VATIBLE pza 5.00 30.03 150.15 0% 150.15 100% 0% 0% 0%
02.04.01.02 DESAGUE Y VENTILACION 1,677.37 0.00 0% 1,677.37 100% 0.00 0% 0.00 0% 0.00 0%
02.04.01.02.01 SALIDA DE DESAGUE DE PVC 2" pto 10.00 71.72 717.20 0% 717.20 100% 0% 0% 0%
02.04.01.02.02 SALIDA DE DESAGUE DE PVC 4" pto 5.00 76.97 384.85 0% 384.85 100% 0% 0% 0%
02.04.01.02.03 SALIDA DE VENTILACION EN PVC SAL 2" pto 3.00 71.72 215.16 0% 215.16 100% 0% 0% 0%
02.04.01.02.04 SALIDA DE SUMIDEROS EN PVC SAL 2" pto 2.00 74.54 149.08 0% 149.08 100% 0% 0% 0%
02.04.01.02.05 SALIDA DE REGISTRO EN PVC SAL 4" pto 2.00 105.54 211.08 0% 211.08 100% 0% 0% 0%
02.04.01.03 REDES DE DISTRIBUCION 726.63 0.00 0% 726.63 100% 0.00 0% 0.00 0% 0.00 0%
02.04.01.03.01 RED DE DISTRIBUCION PVC SAL PARA DESAGUE 4" ml 13.84 18.23 252.30 0% 252.30 100% 0% 0% 0%
02.04.01.03.02 RED DE DISTRIBUCION PVC SAL PARA PLUVIALES 3" ml 54.00 5.55 299.70 0% 299.70 100% 0% 0% 0%
02.04.01.03.03 RED DE DISTRIBUCION PVC SAL PARA DESAGUE 2" ml 9.55 6.60 63.03 0% 63.03 100% 0% 0% 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
02.04.01.03.04 RED DE DISTRIBUCION PVC SAL PARA VENTILACIÓN 2" ml 12.00 9.30 111.60 0% 111.60 100% 0% 0% 0%
02.04.01.04 REDES COLECTORAS 356.70 0.00 0% 356.70 100% 0.00 0% 0.00 0% 0.00 0%
02.04.01.04.01 EXCAVACION DE ZANJAS PARA TUBERIAS (40x85CM) m3 5.98 31.40 187.77 0% 187.77 100% 0% 0% 0%
02.04.01.04.02 RELLENO DE ZANJAS m3 5.38 31.40 168.93 0% 168.93 100% 0% 0% 0%
02.04.01.05 ACCESORIOS 1,451.08 0.00 0% 1,451.08 100% 0.00 0% 0.00 0% 0.00 0%
02.04.01.05.01 CODOS 468.36 0.00 0% 468.36 100% 0.00 0% 0.00 0% 0.00 0%
02.04.01.05.01.01 CODO PVC-SAL 2" * 90 pza 13.00 28.96 376.48 0% 376.48 100% 0% 0% 0%
02.04.01.05.01.02 CODO PVC SAL 4"x 45º pza 2.00 31.46 62.92 0% 62.92 100% 0% 0% 0%
02.04.01.05.01.03 CODO PVC SAL 2"x 45º pza 1.00 28.96 28.96 0% 28.96 100% 0% 0% 0%
02.04.01.05.02 YEES 418.98 0.00 0% 418.98 100% 0.00 0% 0.00 0% 0.00 0%
02.04.01.05.02.01 YEE PVC-SAL DE 2"*2" pza 5.00 29.46 147.30 0% 147.30 100% 0% 0% 0%
02.04.01.05.02.02 YEE PVC-SAL DE 4" x 4" pza 3.00 33.96 101.88 0% 101.88 100% 0% 0% 0%
02.04.01.05.02.03 YEE PVC-SAL CON REDUCCION DE 4" A 2" pza 5.00 33.96 169.80 0% 169.80 100% 0% 0% 0%
02.04.01.05.03 REDUCCION 85.68 0.00 0% 85.68 100% 0.00 0% 0.00 0% 0.00 0%
02.04.01.05.03.01 REDUCCIÓN DE 4" A 2" pza 4.00 21.42 85.68 0% 85.68 100% 0% 0% 0%
02.04.01.05.04 ADITAMENTOS VARIOS 478.06 0.00 0% 478.06 100% 0.00 0% 0.00 0% 0.00 0%
02.04.01.05.04.01 TRAMPA CON SUMIDERO DE BRONCE 2" pza 2.00 49.30 98.60 0% 98.60 100% 0% 0% 0%
02.04.01.05.04.02 REGISTROS DE BRONCE DE 4" pza 4.00 81.65 326.60 0% 326.60 100% 0% 0% 0%
02.04.01.05.04.03 SOMBRERO VENTILACION PVC DE 2" pza 3.00 17.62 52.86 0% 52.86 100% 0% 0% 0%
02.04.02 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 1,715.36 0.00 0% 1,715.36 100% 0.00 0% 0.00 0% 0.00 0%
02.04.02.01 SALIDA PARA AGUA 792.54 0.00 0% 792.54 100% 0.00 0% 0.00 0% 0.00 0%
02.04.02.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 14.00 56.61 792.54 0% 792.54 100% 0% 0% 0%
02.04.02.02 REDES DE DISTRIBUCION 136.48 0% 136.48 100% 0.00 0% 0.00 0% 0.00 0%
02.04.02.02.01 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP ml 20.90 6.53 136.48 0% 136.48 100% 0% 0% 0%
02.04.02.03 ACCESORIOS 786.34 0% 786.34 100% 0.00 0% 0.00 0% 0.00 0%
02.04.02.03.01 CODOS 365.44 0% 365.44 100% 0.00 0% 0.00 0% 0.00 0%
02.04.02.03.01.01 CODO PVC-SAP 1/2" pza 32.00 11.42 365.44 0% 365.44 100% 0% 0% 0%
02.04.02.03.02 TEES 149.04 0% 149.04 100% 0.00 0% 0.00 0% 0.00 0%
02.04.02.03.02.01 TEE PVC-SAP 1/2" pza 12.00 12.42 149.04 0% 149.04 100% 0% 0% 0%
02.04.02.03.03 LLAVES Y VALVULAS 271.86 0% 271.86 100% 0.00 0% 0.00 0% 0.00 0%
02.04.02.03.03.01 VALVULA DE COMPUERTA DE BRONCE UNION ROSCADA 1/2" pza 3.00 90.62 271.86 0% 271.86 100% 0% 0% 0%
03 CONSTRUCCIÓN DE ALMACEN Y COMEDOR 86,932.22 1,728.12 2% 48,385.23 56% 36,516.63 42% 0.00 0% 0.00 0%
03.01 ESTRUCTURAS 28,044.06 1,728.12 6% 26,002.01 93% 11.69 0.04% 0.00 0% 0.00 0%
03.01.01 TRABAJOS PRELIMINARES 263.01 227.93 87% 23.39 9% 11.69 4% 0.00 0% 0.00 0%
03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 35.98 3.20 115.14 115.14 100% 0% 0% 0% 0%
03.01.01.02 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m2 35.98 2.81 101.10 101.10 100% 0% 0% 0% 0%
03.01.01.03 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 35.98 1.30 46.77 11.69 25% 23.39 50% 11.69 25% 0% 0%
03.01.02 MOVIMIENTO DE TIERRAS 2,633.32 1,156.00 44% 1,477.31 56% 0.00 0% 0.00 0% 0.00 0%
03.01.02.01 EXCAVACION PARA VIGAS DE CIMENTACION HASTA =2.30 m DE PROFUNDODAD EN TERRENO NORMAL m3 5.59 51.23 286.38 286.38 100% 0% 0% 0% 0%
03.01.02.02 EXCAVACION PARA CIMIENTO CORRIDO HASTA =0.55 DE PROFUNDODAD EN TERRENO NORMAL m3 1.32 51.23 67.62 67.62 100% 0% 0% 0% 0%
03.01.02.03 EXCAVACION PARA ZAPATAS DE 2.30 DE PROFUNDIDAD EN TERRENO NORMAL m3 9.00 51.23 461.07 461.07 100% 0% 0% 0% 0%
03.01.02.04 EXCAVACION PARA ZAPATAS DE 1.60 DE PROFUNDIDAD EN TERRENO NORMAL m3 13.31 51.23 681.87 340.94 50% 340.94 50% 0% 0% 0%
03.01.02.05 RELLENO Y COMPACTADO CON MATERIAL PROPIO A MANO m3 11.17 31.80 355.21 0% 355.21 100% 0% 0% 0%
03.01.02.06 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO E=4" m3 0.17 17.10 2.91 0% 2.91 100% 0% 0% 0%
03.01.02.07 NIVELACION INTERIOR Y APISONADO CON EQUIPO m2 31.13 4.93 153.47 0% 153.47 100% 0% 0% 0%
03.01.02.08 ACARREO MATERIAL EXEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30.00 ML m3 22.37 21.35 477.60 0% 477.60 100% 0% 0% 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
03.01.02.09 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST.= 2.5 km m3 22.37 6.58 147.19 0% 147.19 100% 0% 0% 0%
03.01.03 OBRAS DE CONCRETO SIMPLE 4,492.04 0.00 0% 4,189.79 93% 0.00 0% 0.00 0% 0.00 0%
03.01.03.01 SOLADO DE CONCRETO C:H 1:12, E=4'', PARA ZAPATAS m2 11.75 25.39 298.33 0% 298.33 100% 0% 0% 0%
03.01.03.02 CONCRETO CICLOPEO f'c=175kg/cm2 + 30 % PG. m3 3.47 285.73 991.48 0% 991.48 100% 0% 0% 0%
03.01.03.03 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10 + 30% P.G. m3 2.84 209.84 595.95 0% 595.95 100% 0% 0% 0%
03.01.03.04 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25% P.M. m3 2.68 324.75 870.33 0% 870.33 100% 0% 0% 0%
03.01.03.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 9.02 50.08 451.72 0% 451.72 100% 0% 0% 0%
03.01.03.06 FALSO PISO DE CONCRETO 1:12 DE E=4" m2 29.48 33.31 981.98 0% 981.98 100% 0% 0% 0%
03.01.03.07 COLUMNETAS DE PROTECCION DESAGUE PLUVIAL 172.19 0.00 0% 129.57 75% 0.00 0% 0.00 0% 0.00 0%
03.01.03.07.01 CONCRETO EN COLUMNETA PLUVIAL f'c=175 kg/cm2 m3 0.13 455.60 59.23 0% 54.37 92% 0% 0% 0%
03.01.03.07.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETA PLUVIAL m2 1.75 64.55 112.96 0% 75.20 67% 0% 0% 0%
03.01.03.08 VEREDAS DE CONCRETO 130.05 0.00 0% 911.72 701% 0.00 0% 0.00 0% 0.00 0%
03.01.03.08.01 VEREDA DE CONCRETO F'C = 140 Kg/cm2 FROTACHADO DE 4" COLOREADO Y BRUÑADO m3 1.70 58.91 100.15 0% 890.94 890% 0% 0% 0%
03.01.03.08.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDAS m2 0.53 56.43 29.91 0% 20.78 69% 0% 0% 0%
03.01.04 CONCRETO ARMADO 20,655.70 344.18 2% 20,311.51 98% 0.00 0% 0.00 0% 0.00 0%
03.01.04.01 ZAPATAS 3,428.32 0.00 0% 3,428.32 100% 0.00 0% 0.00 0% 0.00 0%
03.01.04.01.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 5.87 426.79 2,505.26 0% 2,505.26 100% 0% 0% 0%
03.01.04.01.02 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 161.94 5.70 923.06 0% 923.06 100% 0% 0% 0%
03.01.04.02 VIGA DE CIMENTACION 344.18 344.18 100% 0.00 0% 0.00 0% 0.00 0% 0.00 0%
03.01.04.02.01 CONCRETO PARA VIGA DE CIMENTACION F'C=210 KG/CM2 m3 0.14 457.12 64.00 64.00 100% 0% 0% 0% 0%
03.01.04.02.02 ENCOFRADO Y DESENCOFRADO DE VIGA DE CIMENTACION m2 1.13 54.00 61.02 61.02 100% 0% 0% 0% 0%
03.01.04.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 38.45 5.70 219.17 219.17 100% 0% 0% 0% 0%
03.01.04.03 COLUMNAS 5,727.11 0.00 0% 5,727.11 100% 0.00 0% 0.00 0% 0.00 0%
03.01.04.03.01 CONCRETO PARA COLUMNAS f'c=210 kg/cm2 m3 1.80 552.18 993.92 0% 993.92 100% 0% 0% 0%
03.01.04.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 35.04 64.55 2,261.83 0% 2,261.83 100% 0% 0% 0%
03.01.04.03.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 433.57 5.70 2,471.35 0% 2,471.35 100% 0% 0% 0%
03.01.04.04 COLUMNETAS 166.35 0.00 0% 166.35 100% 0.00 0% 0.00 0% 0.00 0%
03.01.04.04.01 CONCRETO EN COLUMNETAS f'c=175 kg/cm2 m3 0.07 399.18 27.94 0% 27.94 100% 0% 0% 0%
03.01.04.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETAS m2 0.87 64.55 56.16 0% 56.16 100% 0% 0% 0%
03.01.04.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 14.43 5.70 82.25 0% 82.25 100% 0% 0% 0%
03.01.04.05 VIGAS 5,207.15 0.00 0% 5,207.15 100% 0.00 0% 0.00 0% 0.00 0%
03.01.04.05.01 CONCRETO PARA VIGAS f'c=210 kg/cm2 m3 3.16 457.12 1,444.50 0% 1,444.50 100% 0% 0% 0%
03.01.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGAS m2 18.92 76.24 1,442.46 0% 1,442.46 100% 0% 0% 0%
03.01.04.05.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 407.05 5.70 2,320.19 0% 2,320.19 100% 0% 0% 0%
03.01.04.06 VIGA CANAL 763.98 0.00 0% 763.98 100% 0.00 0% 0.00 0% 0.00 0%
03.01.04.06.01 CONCRETO PARA VIGA CANAL f'c=210 kg/cm2 m3 0.25 457.12 114.28 0% 114.28 100% 0% 0% 0%
03.01.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGA CANAL m2 5.04 76.24 384.25 0% 384.25 100% 0% 0% 0%
03.01.04.06.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 46.57 5.70 265.45 0% 265.45 100% 0% 0% 0%
03.01.04.07 VIGUETAS DE AMARRE 38.50 0.00 0% 38.50 100% 0.00 0% 0.00 0% 0.00 0%
03.01.04.07.01 CONCRETO EN VIGUETAS DE AMARRE f'c=175 kg/cm2 m3 0.03 400.23 12.01 0% 12.01 100% 0% 0% 0%
03.01.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGUETAS m2 0.10 76.24 7.62 0% 7.62 100% 0% 0% 0%
03.01.04.07.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 3.31 5.70 18.87 0% 18.87 100% 0% 0% 0%
03.01.04.08 LOSAS ALIGERADAS 4,980.12 0.00 0% 4,980.12 100% 0.00 0% 0.00 0% 0.00 0%
03.01.04.08.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 2.64 448.15 1,183.12 0% 1,183.12 100% 0% 0% 0%
03.01.04.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 32.06 56.56 1,813.31 0% 1,813.31 100% 0% 0% 0%
03.01.04.08.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 188.87 5.70 1,076.56 0% 1,076.56 100% 0% 0% 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
03.01.04.08.04 LADRILLO HUECO DE ARCILLA h=12 cm PARA TECHO ALIGERADO und 247.85 3.66 907.13 0% 907.13 100% 0% 0% 0%
03.02 ARQUITECTURA 55,689.74 0.00 0% 20,611.49 37% 35,078.24 63% 0.00 0% 0.00 0%
03.02.01 MUROS Y TABIQUERIA DE ALBAÑILERIA 6,847.60 0.00 0% 6,847.60 100% 0.00 0% 0.00 0% 0.00 0%
03.02.01.01 MURO DE LADRILLO 18 HUECOS DE SOGA DE 9 x 12.5 x 23 cm. C:A-1:4 x 1.5 CM. m2 14.23 81.98 1,166.58 0% 1,166.58 100% 0% 0% 0%
03.02.01.02 MURO DE LADRILLO 18 HUECOS DE CABEZA DE 9 x 12.5 x 23 cm. C:A-1:4 x 1.5 CM. m2 42.58 133.42 5,681.02 0% 5,681.02 100% 0% 0% 0%
03.02.02 REVOQUES ENLUCIDOS Y MOLDURAS 2,106.03 0.00 0% 2,106.03 100% 0.00 0% 0.00 0% 0.00 0%
03.02.02.01 TARRAJEO EN MUROS INT. MEZ. C:A-1:5 E=2.00 CM ( INCLUIDO VIGUETAS Y COLUMNETAS) m2 43.54 20.23 880.81 0% 880.81 100% 0% 0% 0%
03.02.02.02 TARRAJEO BRUÑADO EN MUROS EXTERIORES C:A-1:5 e=2.00cm. ( INCLUIDO VIGUETAS Y COLUMNETAS) m2 1.58 19.61 30.98 0% 30.98 100% 0% 0% 0%
03.02.02.03 TARRAJEO EN COLUMNAS CON C:A-1:5 E=2.00 CM m2 7.98 29.66 236.69 0% 236.69 100% 0% 0% 0%
03.02.02.04 TARRAJEO EN VIGAS CON C:A-1:5 E=2.00 CM m2 3.50 32.40 113.40 0% 113.40 100% 0% 0% 0%
03.02.02.05 TARRAJEO CON IMPERMEABILIZANTES EN VIGA CANAL m2 5.53 35.92 198.64 0% 198.64 100% 0% 0% 0%
03.02.02.06 VESTIDURA DE DERRAMES CON C:A-1:5 E=2.00 CM ml 13.60 11.99 163.06 0% 163.06 100% 0% 0% 0%
03.02.02.07 BRUÑAS DE 1" ml 62.90 7.67 482.44 0% 482.44 100% 0% 0% 0%
03.02.03 CIELORRASOS 4,596.73 0.00 0% 4,596.73 100% 0.00 0% 0.00 0% 0.00 0%
03.02.03.01 TARRAJEO DE CIELORRASOS CON MEZCLA C:A-1:5 CINTAS e=1.5cm. m2 2.88 47.52 136.86 0% 136.86 100% 0% 0% 0%
03.02.03.02 CIELORRASOS SUSPENDIDO DE BALDOSA ACUSTICA m2 31.70 140.69 4,459.87 0% 4,459.87 100% 0% 0% 0%
03.02.04 PISOS Y PAVIMENTOS 2,377.00 0.00 0% 2,377.00 100% 0.00 0% 0.00 0% 0.00 0%
03.02.04.01 CONTRA PISO DE E=2" m2 4.76 37.19 177.02 0% 177.02 100% 0% 0% 0%
03.02.04.02 PISO DE CERAMICO ANTIDESLIZANTE 0.30 X 0.30 M. EN INTERIORES m2 31.70 69.40 2,199.98 0% 2,199.98 100% 0% 0% 0%
03.02.05 ZOCALOS Y CONTRAZOCALOS 335.19 0.00 0% 335.19 100% 0.00 0% 0% 0%
03.02.05.01 ZOCALO DE CERAMICO TIPO ARIZONA CARAMELO 20x30 CM EN PARED m2 3.82 83.95 320.69 0% 320.69 100% 0% 0% 0%
03.02.05.02 ZOCALO DE CEMENTO PULIDO H=0.40 EN PARED EXTERIOR m2 0.74 19.59 14.50 0% 14.50 100% 0% 0% 0%
03.02.06 CARPINTERIA DE MADERA Y MELAMINA 677.60 0.00 0% 677.60 100% 0.00 0% 0.00 0% 0.00 0%
03.02.06.01 PUERTA DE CONTRAPLACADA CEDRO -TRIPLAY SEGÚN DISEÑO INCL. INSTALACION m2 3.08 220.00 677.60 0% 677.60 100% 0% 0% 0%
03.02.07 CARPINTERIA DE ALUMINIO Y MELAMINE 473.60 0% 473.60 100% 0% 0% 0%
03.02.07.01 VENTANA SISTEMA PROYECTANTE DE VIDRIO TEMPLEX DE 6 mm SEGUN DISEÑO INCL. INST. m2 2.96 160.00 473.60 0% 473.60 100% 0% 0% 0%
03.02.08 CERRAJERIA 115.71 0.00 0% 115.71 100% 0.00 0% 0.00 0% 0.00 0%
03.02.08.01 CHAPA DE PARCHE 3 GOLPES pza 1.00 115.71 115.71 0% 115.71 100% 0% 0% 0%
03.02.09 PINTURA 1,487.96 0.00 0% 889.74 60% 598.22 40% 0.00 0% 0.00 0%
03.02.09.01 PINTURA EN MUROS INTERIORES C/ LATEX SATINADO LAVABLE m2 87.07 10.01 871.57 0% 871.57 100% 0% 0% 0%
03.02.09.02 PINTURA EN MUROS EXTERIORES C/ LATEX SATINADO LAVABLE m2 3.16 11.50 36.34 0% 18.17 50% 18.17 50% 0% 0%
03.02.09.03 PINTURA EN COLUMNAS C/ LATEX SATINADO LAVABLE m2 15.96 10.00 159.60 0% 0% 159.60 100% 0% 0%
03.02.09.04 PINTURA EN VIGAS C/ LATEX SATINADO LAVABLE m2 13.41 11.13 149.25 0% 0% 149.25 100% 0% 0%
03.02.09.05 PINTURA EN DERRAMES C/ LATEX SATINADO LAVABLE ml 27.20 1.62 44.06 0% 0% 44.06 100% 0% 0%
03.02.09.06 PINTURA EN BRUÑAS C/LATEX SATINADO LAVABLE ml 125.80 1.31 164.80 0% 0% 164.80 100% 0% 0%
03.02.09.07 PINTURA EN CIELO RASO C/ LATEX SATINADO LAVABLE m2 5.75 10.84 62.33 0% 0% 62.33 100% 0% 0%
03.02.10 CUBIERTAS 3,453.15 0.00 0% 2,157.61 62% 1,295.53 38% 0.00 0% 0.00 0%
03.02.10.01 CORREA DE MADERA TORNILLO DE 2" x 1" x 10' ml 64.00 13.47 862.08 0% 862.08 100% 0% 0% 0%
03.02.10.02 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 41.20 62.89 2,591.07 0% 1,295.53 50% 1,295.53 50% 0% 0%
03.02.11 VARIOS 33,219.17 0.00 0% 34.68 0% 33,184.49 100% 0.00 0% 0.00 0%
03.02.11.01 JUNTA DE CONSTRUCCION CON TEKNOPORT E=1" m2 2.00 17.34 34.68 0% 34.68 100% 0% 0% 0%
03.02.11.02 LIMPIEZA FINAL DE OBRA m2 36.32 913.67 33,184.49 0% 0% 33,184.49 100% 0% 0%
03.03 INSTALACIONES ELECTRICAS 3,198.42 0% 1,771.73 55% 1,426.69 45% 0.00 0% 0.00 0%
03.03.01 SALIDA PARA ELECTRICIDAD Y TOMACORRIENTES 691.78 0.00 0% 691.78 100% 0.00 0% 0.00 0% 0.00 0%
03.03.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 3.00 65.77 197.31 0% 197.31 100% 0% 0% 0%
03.03.01.02 SALIDA PARA INTERRUPTOR TRIPLE pto 1.00 81.90 81.90 0% 81.90 100% 0% 0% 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
03.03.01.03 SALIDA PARA TOMACORRIENTE DOBLE CON LINEA DE TIERRA (H=0.40) pto 5.00 50.78 253.90 0% 253.90 100% 0% 0% 0%
03.03.01.04 SALIDA EN PARED PARA LUZ DE EMERGENCIA (H=2.20) pto 1.00 65.77 65.77 0% 65.77 100% 0% 0% 0%
03.03.01.05 SALIDA PARA DETECTOR DE HUMO pto 1.00 92.90 92.90 0% 92.90 100% 0% 0% 0%
03.03.02 CANALIZACION Y/O TUBERIA 912.90 0.00 0% 333.72 37% 579.18 63% 0.00 0% 0.00 0%
03.03.02.01 TUBO Ø 20 mm PVC-SEL (ALUMBRADO) ml 8.29 12.94 107.27 0% 107.27 100% 0% 0% 0%
03.03.02.02 TUBO Ø 20 mm PVC-SEL (INTERRUPTOR) ml 7.25 12.94 93.82 0% 93.82 100% 0% 0% 0%
03.03.02.03 TUBO Ø 20 mm PVC-SEL (TOMACORRIENTE) ml 20.50 12.94 265.27 0% 132.64 50% 132.64 50% 0% 0%
03.03.02.04 CURVAS DE 90º DE PVC-SEL 20mm (ILUMINACIÓN) und 11.00 8.69 95.59 0% 0% 95.59 100% 0% 0%
03.03.02.05 CURVAS DE 90º DE PVC-SEL 20mm (TOMACORRIENTE) und 14.00 8.69 121.66 0% 0% 121.66 100% 0% 0%
03.03.02.06 TUBO Ø 20 mm PVC-SAP(DETECTOR DE HUMO) ml 17.72 12.94 229.30 0% 0% 229.30 100% 0% 0%
03.03.03 CONDUCTORES Y/O CABLES 669.34 0.00 0% 367.12 55% 302.21 45% 0.00 0% 0.00 0%
03.03.03.01 CONDUCTOR LSOH 2.5 mm2 ml 95.11 3.86 367.12 0% 367.12 100% 0% 0% 0%
03.03.03.02 CONDUCTOR LSOH 4.0 mm2 ml 61.55 4.91 302.21 0% 0% 302.21 100% 0% 0%
03.03.04 TABLEROS Y ACCESORIOS 379.10 0.00 0% 379.10 100% 0.00 0% 0.00 0% 0.00 0%
03.03.04.01 TABLEROS DE DISTRIBUCION 213.64 0.00 0% 213.64 100% 0.00 0% 0.00 0% 0.00 0%
03.03.04.01.01 TABLERO DE DISTRIBUCION PARA LLAVES TIPO RIEL 12 POLOS und 1.00 213.64 213.64 0% 213.64 100% 0% 0% 0%
03.03.04.02 LLAVES DE INTERRUPCION 151.34 0.00 0% 151.34 100% 0.00 0% 0.00 0% 0.00 0%
03.03.04.02.01 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 15 A pza 1.00 78.17 78.17 0% 78.17 100% 0% 0% 0%
03.03.04.02.02 INTERRUPTOR DIFERENCIAL 2x15/30mA pza 1.00 73.17 73.17 0% 73.17 100% 0% 0% 0%
03.03.04.03 CAJAS DE PASE 14.12 0.00 0% 14.12 100% 0.00 0% 0.00 0% 0.00 0%
03.03.04.03.01 CAJA DE PASE 100 x 100 x 40 und 1.00 14.12 14.12 0% 14.12 100% 0% 0% 0%
03.03.05 ARTEFACTOS ELECTRICOS 545.30 0.00 0% 0.00 0% 545.30 100% 0.00 0% 0.00 0%
03.03.05.01 FLUORESCENTE RECTO 4 x 18w CON PANTALLA TIPO PERCIANA COLGANTE INCL. ACCESORIOS und 3.00 88.86 266.58 0% 0% 266.58 100% 0% 0%
03.03.05.02 LUZ DE EMERGENCIA und 1.00 133.06 133.06 0% 0% 133.06 100% 0% 0%
03.03.05.03 TAPA PROTECCION PARA TOMACORRIENTES pza 5.00 4.56 22.80 0% 0% 22.80 100% 0% 0%
03.03.05.04 DETECTOR DE HUMO und 1.00 122.86 122.86 0% 0% 122.86 100% 0% 0%
04 CONSTRUCCIÓN DE TÓPICO Y ADMINISTRACION 84,350.04 5,283.22 6% 49,207.83 58% 29,858.98 35% 0.00 0% 0.00 0%
04.01 ESTRUCTURAS 37,654.87 5,283.22 14% 31,975.57 85% 396.08 1% 0.00 0% 0.00 0%
04.01.01 TRABAJOS PRELIMINARES 246.93 194.21 79% 29.29 12% 23.43 9% 0.00 0% 0.00 0%
04.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 45.06 3.20 144.19 144.19 100% 0% 0% 0% 0%
04.01.01.02 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m2 45.06 0.98 44.16 44.16 100% 0% 0% 0% 0%
04.01.01.03 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 45.06 1.30 58.58 5.86 10% 29.29 50% 23.43 40% 0% 0%
04.01.02 MOVIMIENTO DE TIERRAS 2,844.31 1,729.05 61% 1,115.26 39% 0.00 0% 0.00 0% 0.00 0%
04.01.02.01 EXCAVACION PARA CIMIENTO CORRIDO HASTA =0.55 DE PROFUNDODAD EN TERRENO NORMAL m3 3.82 51.23 195.70 195.70 100% 0% 0% 0% 0%
04.01.02.02 EXCAVACION PARA ZAPATAS DE 1.60 DE PROFUNDIDAD EN TERRENO NORMAL m3 25.30 51.23 1,296.12 1,296.12 100% 0% 0% 0% 0%
04.01.02.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO A MANO m3 14.92 31.80 474.46 237.23 50% 237.23 50% 0% 0% 0%
04.01.02.04 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO E=4" m3 0.80 17.10 13.68 0% 13.68 100% 0% 0% 0%
04.01.02.05 NIVELACION INTERIOR Y APISONADO CON EQUIPO m2 37.55 10.56 396.53 0% 396.53 100% 0% 0% 0%
04.01.02.06 ACARREO MATERIAL EXEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30.00 ML m3 16.75 21.35 357.61 0% 357.61 100% 0% 0% 0%
04.01.02.07 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST.= 2.5 km m3 16.75 6.58 110.22 0% 110.22 100% 0% 0% 0%
04.01.03 OBRAS DE CONCRETO SIMPLE 5,904.25 3,359.97 57% 2,544.29 43% 0.00 0% 0.00 0% 0.00 0%
04.01.03.01 SOLADO DE CONCRETO C:H 1:12, E=4'', PARA ZAPATAS m2 15.82 25.39 401.67 0% 401.67 100% 0% 0% 0%
04.01.03.02 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10 + 30% P.G. m3 5.18 209.84 1,086.97 1,086.97 100% 0% 0% 0% 0%
04.01.03.03 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25% P.M. m3 5.05 324.75 1,639.99 1,639.99 100% 0% 0% 0% 0%
04.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 12.64 50.08 633.01 633.01 100% 0% 0% 0% 0%
04.01.03.05 FALSO PISO DE CONCRETO 1:12 DE E=4" m2 37.55 33.31 1,250.79 0% 1,250.79 100% 0% 0% 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
04.01.03.06 COLUMNETAS DE PROTECCION DESAGUE PLUVIAL 339.83 0.00 0% 339.83 100% 0.00 0% 0.00 0% 0.00 0%
04.01.03.06.01 CONCRETO EN COLUMNETA PLUVIAL f'c=175 kg/cm2 m3 0.25 455.60 113.90 0% 113.90 100% 0% 0% 0%
04.01.03.06.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETA PLUVIAL m2 3.50 64.55 225.93 0% 225.93 100% 0% 0% 0%
04.01.03.07 VEREDAS DE CONCRETO 552.00 0.00 0% 552.00 100% 0.00 0% 0.00 0% 0.00 0%
04.01.03.07.01 VEREDA DE CONCRETO F'C = 140 Kg/cm2 FROTACHADO DE 4" COLOREADO Y BRUÑADO m3 8.01 58.91 471.87 0% 471.87 100% 0% 0% 0%
04.01.03.07.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDAS m2 1.42 56.43 80.13 0% 80.13 100% 0% 0% 0%
04.01.06 CONCRETO ARMADO 28,659.38 0.00 0% 28,286.73 99% 372.65 1% 0.00 0% 0.00 0%
04.01.06.01 ZAPATAS 4,366.24 0.00 0% 4,366.24 100% 0.00 0% 0.00 0% 0.00 0%
04.01.06.01.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 7.49 426.79 3,196.66 0% 3,196.66 100% 0% 0% 0%
04.01.06.01.02 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 205.19 5.70 1,169.58 0% 1,169.58 100% 0% 0% 0%
04.01.06.02 COLUMNAS 9,340.81 0.00 0% 9,340.81 100% 0.00 0% 0.00 0% 0.00 0%
04.01.06.02.01 CONCRETO PARA COLUMNAS f'c=210 kg/cm2 m3 3.73 552.18 2,059.63 0% 2,059.63 100% 0% 0% 0%
04.01.06.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 54.01 64.55 3,486.35 0% 3,486.35 100% 0% 0% 0%
04.01.06.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 665.76 5.70 3,794.83 0% 3,794.83 100% 0% 0% 0%
04.01.06.03 COLUMNETAS 573.10 0.00 0% 573.10 100% 0.00 0% 0.00 0% 0.00 0%
04.01.06.03.01 CONCRETO EN COLUMNETAS f'c=175 kg/cm2 m3 0.30 399.18 119.75 0% 119.75 100% 0% 0% 0%
04.01.06.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETAS m2 4.05 64.55 261.43 0% 261.43 100% 0% 0% 0%
04.01.06.03.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 33.67 5.70 191.92 0% 191.92 100% 0% 0% 0%
04.01.06.04 VIGAS 6,604.19 0.00 0% 6,604.19 100% 0.00 0% 0.00 0% 0.00 0%
04.01.06.04.01 CONCRETO PARA VIGAS f'c=210 kg/cm2 m3 3.50 457.12 1,599.92 0% 1,599.92 100% 0% 0% 0%
04.01.06.04.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGAS m2 29.01 76.24 2,211.72 0% 2,211.72 100% 0% 0% 0%
04.01.06.04.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 489.92 5.70 2,792.54 0% 2,792.54 100% 0% 0% 0%
04.01.06.05 VIGA CANAL 2,005.33 0.00 0% 2,005.33 100% 0.00 0% 0.00 0% 0.00 0%
04.01.06.05.01 CONCRETO PARA VIGA CANAL f'c=210 kg/cm2 m3 0.68 457.12 310.84 0% 310.84 100% 0% 0% 0%
04.01.06.05.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGA CANAL m2 13.18 76.24 1,004.84 0% 1,004.84 100% 0% 0% 0%
04.01.06.05.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 120.99 5.70 689.64 0% 689.64 100% 0% 0% 0%
04.01.06.06 VIGUETAS DE AMARRE 223.59 0.00 0% 223.59 100% 0.00 0% 0.00 0% 0.00 0%
04.01.06.06.01 CONCRETO EN VIGUETAS DE AMARRE f'c=175 kg/cm2 m3 0.08 400.23 32.02 0% 32.02 100% 0% 0% 0%
04.01.06.06.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGUETAS m2 1.89 76.24 144.09 0% 144.09 100% 0% 0% 0%
04.01.06.06.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 8.33 5.70 47.48 0% 47.48 100% 0% 0% 0%
04.01.06.07 LOSAS ALIGERADAS 5,173.47 0.00 0% 5,173.47 100% 0.00 0% 0.00 0% 0.00 0%
04.01.06.07.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 2.47 448.15 1,106.93 0% 1,106.93 100% 0% 0% 0%
04.01.06.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 28.24 56.56 1,597.25 0% 1,597.25 100% 0% 0% 0%
04.01.06.07.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 192.92 5.70 1,099.64 0% 1,099.64 100% 0% 0% 0%
04.01.06.07.04 LADRILLO HUECO DE ARCILLA h=12 cm PARA TECHO ALIGERADO und 374.22 3.66 1,369.65 0% 1,369.65 100% 0% 0% 0%
04.01.06.08 LOSA MACIZA 372.65 0.00 0% 0.00 0% 372.65 100% 0.00 0% 0.00 0%
04.01.06.08.01 CONCRETO EN LOSA MACIZA f'c=210 kg/cm2 m3 0.20 443.64 88.73 0% 0% 88.73 100% 0% 0%
04.01.06.08.02 ENCOFRADO Y DESENCOFRADO EN LOSA MACIZA m2 1.17 53.25 62.30 0% 0% 62.30 100% 0% 0%
04.01.06.08.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 38.88 5.70 221.62 0% 0% 221.62 100% 0% 0%
04.02 ARQUITECTURA 37,050.73 0.00 0% 8,561.94 23% 28,488.79 77% 0.00 0% 0.00 0%
04.02.01 MUROS Y TABIQUERIA DE ALBAÑILERIA 9,422.29 0.00 0% 5,818.45 62% 3,603.84 38% 0.00 0% 0.00 0%
04.02.01.01 MURO DE LADRILLO 18 HUECOS DE CABEZA DE 9 x 12.5 x 23 cm. C:A-1:4 x 1.5 CM. m2 43.61 133.42 5,818.45 0% 5,818.45 100% 0% 0% 0%
04.02.01.02 MURO DE LADRILLO 18 HUECOS DE SOGA DE 9 x 12.5 x 23 cm. C:A-1:4 x 1.5 CM. m2 43.96 81.98 3,603.84 0% 0% 3,603.84 100% 0% 0%
04.02.02 REVOQUES ENLUCIDOS Y MOLDURAS 5,192.50 0.00 0% 0.00 0% 5,192.50 100% 0.00 0% 0.00 0%
04.02.02.01 TARRAJEO PRIMARIO RAYADO MEZC. C:A .1:5 E=1.5CM INCL. VESTIDURA DE ARISTAS m2 19.04 20.23 385.18 0% 0% 385.18 100% 0% 0%
04.02.02.02 TARRAJEO EN MUROS INT. MEZ. C:A-1:5 E=2.00 CM ( INCLUIDO VIGUETAS Y COLUMNETAS) m2 71.97 16.71 1,202.62 0% 0% 1,202.62 100% 0% 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
04.02.02.03 TARRAJEO BRUÑADO EN MUROS EXTERIORES C:A-1:5 e=2.00cm. ( INCLUIDO VIGUETAS Y COLUMNETAS) m2 8.99 19.61 176.29 0% 0% 176.29 100% 0% 0%
04.02.02.04 TARRAJEO EN COLUMNAS CON C:A-1:5 E=2.00 CM m2 12.41 29.66 368.08 0% 0% 368.08 100% 0% 0%
04.02.02.05 TARRAJEO EN VIGAS CON C:A-1:5 E=2.00 CM m2 9.13 32.40 295.81 0% 0% 295.81 100% 0% 0%
04.02.02.06 TARRAJEO CON IMPERMEABILIZANTES EN VIGA CANAL m2 39.15 35.92 1,406.27 0% 0% 1,406.27 100% 0% 0%
04.02.02.07 VESTIDURA DE DERRAMES CON C:A-1:5 E=2.00 CM ml 52.76 11.99 632.59 0% 0% 632.59 100% 0% 0%
04.02.02.08 BRUÑAS DE 1" ml 94.61 7.67 725.66 0% 0% 725.66 100% 0% 0%
04.02.03 CIELORRASOS 5,439.33 0.00 0% 0.00 0% 5,439.33 100% 0.00 0% 0.00 0%
04.02.03.01 TARRAJEO DE CIELORRASOS CON MEZCLA C:A-1:5 CINTAS e=1.5cm. m2 4.92 47.52 233.80 0% 0% 233.80 100% 0% 0%
04.02.03.02 CIELORRASOS SUSPENDIDO DE BALDOSA ACUSTICA m2 37.00 140.69 5,205.53 0% 0% 5,205.53 100% 0% 0%
04.02.04 PISOS Y PAVIMENTOS 3,788.43 0.00 0% 2,582.23 68% 1,206.20 32% 0.00 0% 0.00 0%
04.02.04.01 CONTRA PISO DE E=2" m2 37.00 37.19 1,376.03 0% 1,376.03 100% 0% 0% 0%
04.02.04.02 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 60 X 60CM. m2 37.00 65.20 2,412.40 0% 1,206.20 50% 1,206.20 50% 0% 0%
04.02.05 ZOCALOS Y CONTRAZOCALOS 200.50 0.00 0% 0.00 0% 200.50 100% 0.00 0% 0.00 0%
04.02.05.01 ZOCALO DE MADERA CEDRO 1/2" m2 6.76 29.66 200.50 0% 0% 200.50 100% 0% 0%
04.02.06 CARPINTERIA DE MADERA Y MELAMINA 1,201.20 0.00 0% 0.00 0% 1,201.20 100% 0.00 0% 0.00 0%
04.02.06.01 PUERTA DE CONTRAPLACADA CEDRO -TRIPLAY SEGÚN DISEÑO INCL. INSTALACION m2 5.46 220.00 1,201.20 0% 0% 1,201.20 100% 0% 0%
04.02.07 CARPINTERIA DE ALUMINIO Y MELAMINE 1,528.00 0.00 0% 0.00 0% 1,528.00 100% 0.00 0% 0.00 0%
04.02.07.01 VENTANA SISTEMA PROYECTANTE DE VIDRIO TEMPLEX DE 6 mm SEGUN DISEÑO INCL. INST. m2 9.55 160.00 1,528.00 0% 0% 1,528.00 100% 0% 0%
04.02.08 CERRAJERIA 588.57 0.00 0% 0.00 0% 588.57 100% 0.00 0% 0.00 0%
04.02.08.01 BISAGRAS ALUMINIZADAS TIPO CAPUCHINA DE 3 1/2"X 3 1/2" pza 12.00 20.12 241.44 0% 0% 241.44 100% 0% 0%
04.02.08.02 CHAPA DE PARCHE 3 GOLPES pza 3.00 115.71 347.13 0% 0% 347.13 100% 0% 0%
04.02.09 PINTURA 2,770.17 0.00 0% 0.00 0% 2,770.17 100% 0.00 0% 0.00 0%
04.02.09.01 PINTURA EN MUROS INTERIORES C/ LATEX SATINADO LAVABLE m2 143.93 10.01 1,440.74 0% 0% 1,440.74 100% 0% 0%
04.02.09.02 PINTURA EN MUROS EXTERIORES C/ LATEX SATINADO LAVABLE m2 17.97 11.50 206.66 0% 0% 206.66 100% 0% 0%
04.02.09.03 PINTURA EN COLUMNAS C/ LATEX SATINADO LAVABLE m2 24.83 10.00 248.30 0% 0% 248.30 100% 0% 0%
04.02.09.04 PINTURA EN VIGAS C/ LATEX SATINADO LAVABLE m2 18.26 11.13 203.23 0% 0% 203.23 100% 0% 0%
04.02.09.05 PINTURA EN DERRAMES C/ LATEX SATINADO LAVABLE ml 105.52 1.62 170.94 0% 0% 170.94 100% 0% 0%
04.02.09.06 PINTURA EN BRUÑAS C/LATEX SATINADO LAVABLE ml 189.22 1.31 247.88 0% 0% 247.88 100% 0% 0%
04.02.09.07 PINTURA EN CIELO RASO C/ LATEX SATINADO LAVABLE m2 9.83 10.84 106.56 0% 0% 106.56 100% 0% 0%
04.02.09.08 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 6.00 24.31 145.86 0% 0% 145.86 100% 0% 0%
04.02.10 CUBIERTAS 6,616.28 0.00 0% 0.00 0% 6,616.28 100% 0.00 0% 0.00 0%
04.02.10.01 CORREA DE MADERA TORNILLO DE 2" x 1" x 10' ml 240.00 13.47 3,232.80 0% 0% 3,232.80 100% 0% 0%
04.02.10.02 COBERTURA ARTICULADA TIPO TEJA ANDINA m2 53.80 62.89 3,383.48 0% 0% 3,383.48 100% 0% 0%
04.02.11 VARIOS 303.46 0.00 0% 161.26 53% 142.20 47% 0.00 0% 0.00 0%
04.02.11.01 JUNTAS DE CONSTRUCCION CON TECKNOPORT E=1" ml 9.30 17.34 161.26 0% 161.26 100% 0% 0% 0%
04.02.11.02 LIMPIEZA FINAL DE OBRA m2 60.00 2.37 142.20 0% 0% 142.20 100% 0% 0%
04.03 INSTALACIONES ELECTRICAS 6,892.57 0% 5,918.46 86% 974.11 14% 0.00 0% 0.00 0%
04.03.01 SALIDA PARA ELECTRICIDAD Y TOMACORRIENTES 1,697.37 0.00 0% 1,697.37 100% 0.00 0% 0.00 0% 0.00 0%
04.03.01.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 6.00 65.77 394.62 0% 394.62 100% 0% 0% 0%
04.03.01.02 SALIDA PARA INTERRUPTOR SIMPLE pto 2.00 92.90 185.80 0% 185.80 100% 0% 0% 0%
04.03.01.03 SALIDA PARA INTERRUPTOR TRIPLE pto 4.00 81.90 327.60 0% 327.60 100% 0% 0% 0%
04.03.01.04 SALIDA PARA TOMACORRIENTE DOBLE CON LINEA DE TIERRA (H=0.40) pto 8.00 50.78 406.24 0% 406.24 100% 0% 0% 0%
04.03.01.05 SALIDA EN PARED PARA LUZ DE EMERGENCIA (H=2.20) pto 3.00 65.77 197.31 0% 197.31 100% 0% 0% 0%
04.03.01.06 SALIDA PARA DETECTOR DE HUMO pto 2.00 92.90 185.80 0% 185.80 100% 0% 0% 0%
04.03.02 CANALIZACION Y/O TUBERIA 1,633.40 0.00 0% 659.29 40% 974.11 60% 0.00 0% 0.00 0%
04.03.02.01 TUBO Ø 20 mm PVC-SEL (ALUMBRADO) ml 28.11 12.94 363.74 0% 363.74 100% 0% 0% 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
04.03.02.02 TUBO Ø 20 mm PVC-SEL (INTERRUPTOR) ml 22.84 12.94 295.55 0% 295.55 100% 0% 0% 0%
04.03.02.03 TUBO Ø 20 mm PVC-SEL (TOMACORRIENTE) ml 31.39 12.94 406.19 0% 0% 406.19 100% 0% 0%
04.03.02.04 CURVAS DE 90º DE PVC-SEL 20mm (ILUMINACIÓN) und 26.00 8.69 225.94 0% 0% 225.94 100% 0% 0%
04.03.02.05 CURVAS DE 90º DE PVC-SEL 20mm (TOMACORRIENTE) und 18.00 8.69 156.42 0% 0% 156.42 100% 0% 0%
04.03.02.06 TUBO Ø 20 mm PVC-SAP(DETECTOR DE HUMO) ml 14.34 12.94 185.56 0% 0% 185.56 100% 0% 0%
04.03.03 CONDUCTORES Y/O CABLES 896.48 0.00 0% 896.48 100% 0% 0% 0%
04.03.03.01 CONDUCTOR LSOH 2.5 mm2 ml 112.45 3.86 434.06 0% 434.06 100% 0% 0% 0%
04.03.03.02 CONDUCTOR LSOH 4.0 mm2 ml 94.18 4.91 462.42 0% 462.42 100% 0% 0% 0%
04.03.04 TABLEROS Y ACCESORIOS 980.53 0.00 0% 980.53 100% 0% 0% 0.00 0% 0.00 0%
04.03.04.01 TABLEROS DE DISTRIBUCION 213.64 0% 213.64 100% 0% 0% 0%
04.03.04.01.01 TABLERO DE DISTRIBUCION PARA LLAVES TIPO RIEL 12 POLOS pza 1.00 213.64 213.64 0% 213.64 100% 0% 0% 0%
04.03.04.02 LLAVES DE INTERRUPCION 718.53 0% 718.53 100% 0% 0% 0%
04.03.04.02.01 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 15 A pza 6.00 83.17 499.02 0% 499.02 100% 0% 0% 0%
04.03.04.02.02 INTERRUPTOR DIFERENCIAL 2x15/30mA pza 3.00 73.17 219.51 0% 219.51 100% 0% 0% 0%
04.03.04.03 CAJAS DE PASE 48.36 0% 48.36 100% 0% 0% 0%
04.03.04.03.01 CAJA DE PASE 100 x 100 x 40 und 3.00 16.12 48.36 0% 48.36 100% 0% 0% 0%
04.03.05 ARTEFACTOS ELECTRICOS 1,684.79 0% 1,684.79 100% 0% 0% 0%
04.03.05.01 FLUORECENTE CIRCULAR DE 32 WATT (INCLUYE EQUIPO COMPLETO) und 6.00 70.61 423.66 0% 423.66 100% 0% 0% 0%
04.03.05.02 LUZ DE EMERGENCIA und 3.00 133.06 399.18 0% 399.18 100% 0% 0% 0%
04.03.05.03 MODEN WIFI pza 1.00 216.26 216.26 0% 216.26 100% 0% 0% 0%
04.03.05.04 RACK PARA MODEM pza 1.00 44.17 44.17 0% 44.17 100% 0% 0% 0%
04.03.05.05 TAPA PROTECCION PARA TOMACORRIENTES pza 8.00 4.56 36.48 0% 36.48 100% 0% 0% 0%
04.03.05.06 DETECTOR DE HUMO und 2.00 122.86 245.72 0% 245.72 100% 0% 0% 0%
04.03.05.07 PANEL DEL SISTEMA CONTRA INCENDIOS CON ALARMA und 1.00 319.32 319.32 0% 319.32 100% 0% 0% 0%
04.04 INSTALACIONES SANITARIAS 2,751.86 0.00 0% 2,751.86 100% 0.00 0% 0.00 0% 0.00 0%
04.04.01 SISTEMA DE DESAGUE 2,277.87 0.00 0% 2,277.87 100% 0.00 0% 0.00 0% 0.00 0%
04.04.01.01 APARATOS Y ACCESORIOS SANITARIOS 866.14 0.00 0% 866.14 100% 0.00 0% 0.00 0% 0.00 0%
04.04.01.01.01 INODORO TANQUE BAJO BLANCO MODELO BABY FRESH und 1.00 342.94 342.94 0% 342.94 100% 0% 0% 0%
04.04.01.01.02 LAVATORIO DE CERAMICO OVALIN BABY TREBOL SONET und 1.00 262.94 262.94 0% 262.94 100% 0% 0% 0%
04.04.01.01.03 URINARIO DE CERAMICO CADET BLANCO und 1.00 182.94 182.94 0% 182.94 100% 0% 0% 0%
04.04.01.01.04 PORTA PAPEL DE LOZA C/BLANCO pza 1.00 47.29 47.29 0% 47.29 100% 0% 0% 0%
04.04.01.01.05 PAPELERA DE PLASTICO TAPA CON VENTANA VATIBLE pza 1.00 30.03 30.03 0% 30.03 100% 0% 0% 0%
04.04.01.02 DESAGUE Y VENTILACION 400.49 0.00 0% 400.49 100% 0.00 0% 0.00 0% 0.00 0%
04.04.01.02.01 SALIDA DE DESAGUE DE PVC 2" pto 1.00 71.72 71.72 0% 71.72 100% 0% 0% 0%
04.04.01.02.02 SALIDA DE DESAGUE DE PVC 4" pto 1.00 76.97 76.97 0% 76.97 100% 0% 0% 0%
04.04.01.02.03 SALIDA DE VENTILACION EN PVC SAL 2" pto 1.00 71.72 71.72 0% 71.72 100% 0% 0% 0%
04.04.01.02.04 SALIDA DE SUMIDEROS EN PVC SAL 2" pto 1.00 74.54 74.54 0% 74.54 100% 0% 0% 0%
04.04.01.02.05 SALIDA DE REGISTRO EN PVC SAL 4" pto 1.00 105.54 105.54 0% 105.54 100% 0% 0% 0%
04.04.01.03 REDES DE DISTRIBUCION 347.22 0.00 0% 347.22 100% 0.00 0% 0.00 0% 0.00 0%
04.04.01.03.01 RED DE DISTRIBUCION PVC SAL PARA DESAGUE 4" ml 9.59 18.23 174.83 0% 174.83 100% 0% 0% 0%
04.04.01.03.02 RED DE DISTRIBUCION PVC SAL PARA PLUVIALES 3" ml 13.80 5.55 76.59 0% 76.59 100% 0% 0% 0%
04.04.01.03.03 RED DE DISTRIBUCION PVC SAL PARA DESAGUE 2" ml 8.88 6.60 58.61 0% 58.61 100% 0% 0% 0%
04.04.01.03.04 RED DE DISTRIBUCION PVC SAL PARA VENTILACIÓN 2" ml 4.00 9.30 37.20 0% 37.20 100% 0% 0% 0%
04.04.01.04 REDES COLECTORAS 155.12 0.00 0% 155.12 100% 0.00 0% 0.00 0% 0.00 0%
04.04.01.04.01 EXCAVACION DE ZANJAS PARA TUBERIAS (40x85CM) m3 2.60 31.40 81.64 0% 81.64 100% 0% 0% 0%
04.04.01.04.02 RELLENO DE ZANJAS m3 2.34 31.40 73.48 0% 73.48 100% 0% 0% 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
04.04.01.05 ACCESORIOS 508.90 0.00 0% 508.90 100% 0.00 0% 0.00 0% 0.00 0%
04.04.01.05.01 CODOS 260.64 0.00 0% 260.64 100% 0.00 0% 0.00 0% 0.00 0%
04.04.01.05.01.01 CODO PVC-SAL 2" * 90 pza 9.00 28.96 260.64 0% 260.64 100% 0% 0% 0%
04.04.01.05.02 YEES 78.27 0.00 0% 78.27 100% 0.00 0% 0.00 0% 0.00 0%
04.04.01.05.02.01 YEE PVC-SAL DE 2"*2" pza 2.00 29.46 58.92 0% 58.92 100% 0% 0% 0%
04.04.01.05.02.02 YEE PVC-SAL CON REDUCCION DE 4" A 2" pza 1.00 19.35 19.35 0% 19.35 100% 0% 0% 0%
04.04.01.05.03 REDUCCION 21.42 0.00 0% 21.42 100% 0.00 0% 0.00 0% 0.00 0%
04.04.01.05.03.01 REDUCCIÓN DE 4" A 2" pza 1.00 21.42 21.42 0% 21.42 100% 0% 0% 0%
04.04.01.05.04 ADITAMENTOS VARIOS 148.57 0.00 0% 148.57 100% 0.00 0% 0.00 0% 0.00 0%
04.04.01.05.04.01 TRAMPA CON SUMIDERO DE BRONCE 2" pza 1.00 49.30 49.30 0% 49.30 100% 0% 0% 0%
04.04.01.05.04.02 REGISTROS DE BRONCE DE 4" pza 1.00 81.65 81.65 0% 81.65 100% 0% 0% 0%
04.04.01.05.04.03 SOMBRERO VENTILACION PVC DE 2" pza 1.00 17.62 17.62 0% 17.62 100% 0% 0% 0%
04.04.02 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 473.99 0.00 0% 473.99 100% 0.00 0% 0.00 0% 0.00 0%
04.04.02.01 SALIDA PARA AGUA 169.83 0.00 0% 169.83 100% 0.00 0% 0.00 0% 0.00 0%
04.04.02.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 3.00 56.61 169.83 0% 169.83 100% 0% 0% 0%
04.04.02.02 REDES DE DISTRIBUCION 27.82 0.00 0% 27.82 100% 0.00 0% 0.00 0% 0.00 0%
04.04.02.02.01 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP ml 4.26 6.53 27.82 0% 27.82 100% 0% 0% 0%
04.04.02.03 ACCESORIOS 185.72 0.00 0% 185.72 100% 0.00 0% 0.00 0% 0.00 0%
04.04.02.03.01 CODOS 148.46 0.00 0% 148.46 100% 0.00 0% 0.00 0% 0.00 0%
04.04.02.03.01.01 CODO PVC-SAP 1/2" pza 13.00 11.42 148.46 0% 148.46 100% 0% 0% 0%
04.04.02.03.02 TEES 37.26 0.00 0% 37.26 100% 0.00 0% 0.00 0% 0.00 0%
04.04.02.03.02.01 TEE PVC-SAP 1/2" pza 3.00 12.42 37.26 0% 37.26 100% 0% 0% 0%
04.04.02.04 LLAVES Y VALVULAS 90.62 0.00 0% 90.62 100% 0.00 0% 0.00 0% 0.00 0%
04.04.02.04.01 VALVULA DE COMPUERTA DE BRONCE UNION ROSCADA 1/2" pza 1.00 90.62 90.62 0% 90.62 100% 0% 0% 0%
05 CERCO PERIMETRICO 35,628.13 0.00 0% 0.00 0% 0.00 0% 21,019.48 59% 14,608.65 41%
05.01 ESTRUCTURAS 21,019.48 0.00 0% 0.00 0% 0.00 0% 2101948% 100% 0.00 0%
05.01.01 TRABAJOS PRELIMINARES 357.16 0.00 0% 0.00 0% 0.00 0% 357.16 100% 0.00 0%
05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 50.95 5.63 286.85 0% 0% 0% 286.85 100% 0%
05.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 50.95 1.18 60.12 0% 0% 0% 60.12 100% 0%
05.01.01.03 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 50.95 0.20 10.19 0% 0% 0% 10.19 100% 0%
05.01.02 MOVIMIENTO DE TIERRAS 1,319.78 0.00 0% 0.00 0% 0.00 0% 1,319.78 100% 0.00 0%
05.01.02.01 EXCAVACION PARA CIMIENTOS HASTA H=1.00 a 2.00 M DE PROFUNDIDAD EN TERRENO NORMAL m3 46.06 6.17 284.19 0% 0% 0% 284.19 100% 0%
05.01.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO 95% DE COMPACTACION m3 15.19 0.07 1.06 0% 0% 0% 1.06 100% 0%
05.01.02.03 ACARREO MATERIAL EXEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30.00 ML m3 37.04 21.35 790.80 0% 0% 0% 790.80 100% 0%
05.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST.= 2.5 km m3 37.04 6.58 243.72 0% 0% 0% 243.72 100% 0%
05.01.03 OBRAS DE CONCRETO SIMPLE 10,213.90 0.00 0% 0.00 0% 0.00 0% 10,213.90 100% 0.00 0%
05.01.03.01 CONCRETO PARA CIMIENTOS CORRIDOS C:H-1:10 + 30% P.G. m3 5.64 209.84 1,183.50 0% 0% 0% 1,183.50 100% 0%
05.01.03.02 CONCRETO PARA MURO DE MAPOSTERIA DE PIEDRA C:H-1:8+75%P.G. m3 21.80 224.49 4,893.88 0% 0% 0% 4,893.88 100% 0%
05.01.03.03 CONCRETO PARA SOBRECIMIENTOS C:H-1:8 + 25% P.M. m3 3.01 324.75 977.50 0% 0% 0% 977.50 100% 0%
05.01.03.04 ENCOFRADO Y DESENCOFRADO DE MAPOSTERIA DE PIEDRA H=1.00 A 2.00 m2 46.60 42.89 1,998.67 0% 0% 0% 1,998.67 100% 0%
05.01.03.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS H= 40CM m2 23.17 50.08 1,160.35 0% 0% 0% 1,160.35 100% 0%
05.01.04 OBRAS DE CONCRETO ARMADO 9,128.63 0.00 0% 0.00 0% 0.00 0% 9,128.63 100% 0.00 0%
05.01.04.01 COLUMNAS 6,586.03 0.00 0% 0.00 0% 0.00 0% 6,586.03 100% 0.00 0%
05.01.04.01.01 CONCRETO PARA COLUMNAS f'c=175 kg/cm2 m3 1.91 552.18 1,054.66 0% 0% 0% 1,054.66 100% 0%
05.01.04.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 44.63 64.55 2,880.87 0% 0% 0% 2,880.87 100% 0%
05.01.04.01.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 465.00 5.70 2,650.50 0% 0% 0% 2,650.50 100% 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
05.01.04.02 VIGAS 2,542.60 0.00 0% 0.00 0% 0.00 0% 2,542.60 100% 0.00 0%
05.01.04.02.01 CONCRETO EN VIGAS f'c=175 kg/cm2 m3 1.14 457.12 521.12 0% 0% 0% 521.12 100% 0%
05.01.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGAS m2 16.93 76.24 1,290.74 0% 0% 0% 1,290.74 100% 0%
05.01.04.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 128.20 5.70 730.74 0% 0% 0% 730.74 100% 0%
05.02 ARQUITECTURA 14,608.65 0.00 0% 0.00 0% 0.00 0% 0.00 0% 14,608.65 100%
05.02.01 MUROS Y TABIQUERIA DE ALBAÑILERIA 9,247.77 0.00 0% 0.00 0% 0.00 0% 0.00 0% 9,247.77 100%
05.02.01.01 MURO TIPO CARAVISTA CON LADRILLO KING KONG 18 HUECOS DE SOGA DE 9 x 12.5 x 23 cm. C:A-1:4 x 1.5 CM. m2 97.54 94.81 9,247.77 0% 0% 0% 0% 9,247.77 100%
05.02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 2,328.62 0.00 0% 0.00 0% 0.00 0% 0.00 0% 2,328.62 100%
05.02.02.01 TARRAJEO EN COLUMNAS CON C:A-1:5 E=1.5 CM ICL VESTIDURA DE ARISTAS m2 35.06 29.66 1,039.88 0% 0% 0% 0% 1,039.88 100%
05.02.02.02 TARRAJEO EN VIGAS CON C:A - 1:5 E:1.5CM INCL. VESTIDURA DE ARISTAS m2 21.71 38.36 832.80 0% 0% 0% 0% 832.80 100%
05.02.02.03 TARRAJEO EN SOBRECIMIENTOS CON C:A - 1:5 E=1.5 CM m2 19.56 23.31 455.94 0% 0% 0% 0% 455.94 100%
05.02.03 CARPINTERIA METALICA Y HERRERIA 1,956.19 0.00 0% 0.00 0% 0.00 0% 0.00 0% 1,956.19 100%
05.02.03.01 CERCO METALICO SEGÚN DISEÑO INCL. INSTALACION ml 2.87 681.60 1,956.19 0% 0% 0% 0% 1,956.19 100%
05.02.04 PINTURA 1,019.89 0.00 0% 0.00 0% 0.00 0% 0.00 0% 1,019.89 100%
05.02.04.01 PINTURA EN COLUMNAS C/ LATEX SATINADO LAVABLE m2 35.00 10.00 350.00 0% 0% 0% 0% 350.00 100%
05.02.04.02 PINTURA EN VIGAS CON LATEX SATINADO LAVABLE m2 27.76 11.13 308.97 0% 0% 0% 0% 308.97 100%
05.02.04.03 PINTURA ESMALTE SINTETICO EN SOBRECIMIENTO 2 MANOS m2 36.31 9.94 360.92 0% 0% 0% 0% 360.92 100%
05.02.05 VARIOS 56.18 0.00 0% 0.00 0% 0.00 0% 0.00 0% 56.18 100%
05.02.05.01 JUNTA DE CONSTRUCCION CON TEKNOPORT m2 3.24 17.34 56.18 0% 0% 0% 0% 56.18 100%
06 PORTADA 6,269.12 0.00 0% 0.00 0% 0.00 0% 0.00 0% 6,269.12 100%
06.01 ESTRUCTURAS 3,741.29 0.00 0% 0.00 0% 0.00 0% 0.00 0% 3,741.29 100%
06.01.01 TRABAJOS PRELIMINARES 20.75 0.00 0% 0.00 0% 0.00 0% 0.00 0% 20.75 100%
06.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 2.96 5.63 16.66 0% 0% 0% 0% 16.66 100%
06.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.96 1.18 3.49 0% 0% 0% 0% 3.49 100%
06.01.01.03 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO m2 2.96 0.20 0.59 0% 0% 0% 0% 0.59 100%
06.01.02 MOVIMIENTO DE TIERRAS 146.18 0.00 0% 0.00 0% 0.00 0% 0.00 0% 146.18 100%
06.01.02.01 EXCAVACION PARA ZAPATAS DE 1.00 A 1.90m DE PROFUNDIDAD EN TERRENO NORMAL m3 2.00 51.23 102.46 0% 0% 0% 0% 102.46 100%
06.01.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO 95% DE COMPACTACION m3 1.20 0.07 0.08 0% 0% 0% 0% 0.08 100%
06.01.02.03 NIVELACION Y APISONADO CON EQUIPO m2 2.96 4.93 14.59 0% 0% 0% 0% 14.59 100%
06.01.02.04 ACARREO MATERIAL EXEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30.00 ML m3 1.04 21.35 22.20 0% 0% 0% 0% 22.20 100%
06.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST.= 2.5 km m3 1.04 6.58 6.84 0% 0% 0% 0% 6.84 100%
06.01.03 OBRAS DE CONCRETO SIMPLE 5.08 0.00 0% 0.00 0% 0.00 0% 0.00 0% 5.08 100%
06.01.03.01 SOLADO DE CONCRETO C:H 1:12, E=4'', PARA ZAPATA m2 0.20 25.39 5.08 0% 0% 0% 0% 5.08 100%
06.01.04 OBRAS DE CONCRETO ARMADO 3,569.28 0.00 0% 0.00 0% 0.00 0% 0.00 0% 3,569.28 100%
06.01.04.01 ZAPATAS 658.64 0.00 0% 0.00 0% 0% 0% 0% 0% 658.64 100%
06.01.04.01.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 1.20 426.79 512.15 0% 0% 0% 0% 512.15 100%
06.01.04.01.02 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 25.70 5.70 146.49 0% 0% 0% 0% 146.49 100%
06.01.04.02 COLUMNAS 2,424.43 0.00 0% 0.00 0% 0% 0% 0% 0% 2,424.43 100%
06.01.04.02.01 CONCRETO PARA COLUMNAS f'c=175 kg/cm2 m3 1.26 552.18 695.75 0% 0% 0% 0% 695.75 100%
06.01.04.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 19.25 64.55 1,242.59 0% 0% 0% 0% 1,242.59 100%
06.01.04.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 85.28 5.70 486.10 0% 0% 0% 0% 486.10 100%
06.01.04.03 PLACA DE CONCRETO 486.21 0.00 0% 0.00 0% 0% 0% 0% 0% 486.21 100%
06.01.04.03.01 CONCRETO PARA PLACA f'c=210 kg/cm2 m3 0.30 550.57 165.17 0% 0% 0% 0% 165.17 100%
06.01.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN PLACA m2 3.45 57.65 198.89 0% 0% 0% 0% 198.89 100%
06.01.04.03.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 21.43 5.70 122.15 0% 0% 0% 0% 122.15 100%
06.02 ARQUITECTURA 2,527.82 0.00 0% 0.00 0% 0.00 0% 0.00 0% 2,527.82 100%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
06.02.01 MUROS Y TABIQUERIA DE ALBAÑILERIA 45.51 0.00 0% 0.00 0% 0.00 0% 0.00 0% 45.51 100%
06.02.01.01 MURO TIPO CARAVISTA CON LADRILLO KING KONG 18 HUECOS DE SOGA DE 9 x 12.5 x 23 cm. C:A-1:4 x 1.5 CM. m2 0.48 94.81 45.51 0% 0% 0% 0% 45.51 100%
06.02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 283.62 0% 0% 0% 0% 283.62 100%
06.02.02.01 TARRAJEO PRIMARIO RAYADO CON C:A - 1:5 E=1.5 CM m2 14.02 20.23 283.62 0% 0% 0% 0% 283.62 100%
06.02.03 CARPINTERIA METALICA Y HERRERIA 1,872.35 0.00 0% 0.00 0% 0.00 0% 0.00 0% 1,872.35 100%
06.02.03.01 PUERTA METALICA SEGUN DISEÑO INCL. INSTALACION m2 4.76 393.35 1,872.35 0% 0% 0% 0% 1,872.35 100%
06.02.04 CERRAJERIA 115.71 0.00 0% 0.00 0% 0.00 0% 0.00 0% 115.71 100%
06.02.04.01 CHAPA DE PARCHE 3 GOLPES pza 1.00 115.71 115.71 0% 0% 0% 0% 115.71 100%
06.02.05 PINTURA 210.63 0.00 0% 0.00 0% 0.00 0% 0.00 0% 210.63 100%
06.02.05.01 PINTURA EN PLACA C/ LATEX SATINADO LAVABLE m2 5.31 10.48 55.65 0% 0% 0% 0% 55.65 100%
06.02.05.02 PINTURA ESMALTE Y ANTICORROSIVO EN CARPINTERIA METALICA m2 4.76 13.21 62.88 0% 0% 0% 0% 62.88 100%
06.02.05.03 PINTURA EN COLUMNAS C/ LATEX SATINADO LAVABLE m2 7.75 10.00 77.50 0% 0% 0% 0% 77.50 100%
06.02.05.04 PINTURA EN MUROS C/ LATEX SATINADO LAVABLE m2 1.27 11.50 14.61 0% 0% 0% 0% 14.61 100%
07 OBRAS EXTERIORES 68,792.78 37,539.15 55% 0.00 0% 0.00 0% 31,253.66 45% 0.00 0%
07.01 OBRAS PROVISIONALES, DEMOLICIONES Y TRABAJOS PRELIMINARES 9,877.71 9,877.71 100% 0.00 0% 0.00 0% 0.00 0% 0.00 0%
07.01.01 CONSTRUCCIONES PROVISIONALES 6,407.15 6,407.15 100% 0.00 0% 0.00 0% 0.00 0% 0.00 0%
07.01.01.01 MOVILIZACIÓN Y DESMOVILIZACIÓN DE MAQUINARIA Y EQUIPOS - PAVIMENTACION glb 1.00 1,000.00 1,000.00 1,000.00 100% 0% 0% 0% 0%
07.01.01.02 OFICINA PARA RESIDENCIA Y SUPERVISION mes 5.00 250.00 1,250.00 1,250.00 100% 0% 0% 0% 0%
07.01.01.03 GUARDIANIA Y ALMACEN mes 5.00 250.00 1,250.00 1,250.00 100% 0% 0% 0% 0%
07.01.01.04 CARTEL DE OBRA 3.60 X 2.40 SEGUN MODELO INCL. INSTALACION EN OBRA und 1.00 464.70 464.70 464.70 100% 0% 0% 0% 0%
07.01.01.05 CONSTRUCCION PROVISIONAL DE CERCO DE PROTECCION ml 95.00 25.71 2,442.45 2,442.45 100% 0% 0% 0% 0%
07.01.02 TRABAJOS PRELIMINARES 3,470.56 3,470.56 100% 0.00 0% 0.00 0% 0.00 0% 0.00 0%
07.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 436.00 2.11 919.96 919.96 100% 0% 0% 0% 0%
07.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 436.00 2.87 1,251.32 1,251.32 100% 0% 0% 0% 0%
07.01.02.03 TRAZO Y REPLANTEO PRELIMINAR DURANTE EL PROCESO m2 436.00 2.98 1,299.28 1,299.28 100% 0% 0% 0% 0%
07.02 ESTRUCTURAS 38,673.49 27,661.44 72% 0.00 0% 0.00 0% 11,012.04 28% 0.00 0%
07.02.01 MOVIMIENTO DE TIERRAS 28,308.94 27,661.44 98% 0.00 0% 0.00 0% 647.50 2% 0.00 0%
07.02.01.01 EXCAVACION 647.50 0.00 0% 0.00 0% 0.00 0% 647.50 100% 0.00 0%
07.02.01.01.01 EXCAVACION DE ZANJAS PARA SARDINEL CUNETA 0.40 M EN TERRENO NORMAL m3 9.89 65.47 647.50 0% 0% 0% 647.50 100% 0%
07.02.01.02 DEMOLICIONES 9,438.48 9,438.48 100% 0.00 0% 0.00 0% 0.00 0% 0.00 0%
07.02.01.02.01 DESMONTAJE DE COBERTURAS m2 79.69 11.27 898.11 898.11 100% 0% 0% 0% 0%
07.02.01.02.02 DESMONTAJE DE PUERTAS Y VENTANAS und 11.00 12.45 136.95 136.95 100% 0% 0% 0% 0%
07.02.01.02.03 DESMONTAJE DE TIJERALES DE MADERA und 7.00 76.19 533.33 533.33 100% 0% 0% 0% 0%
07.02.01.02.04 DESMONTAJE DE CORREAS DE MADERA und 124.00 6.27 777.48 777.48 100% 0% 0% 0% 0%
07.02.01.02.05 DESMONTAJE DE CIELORRASO EXISTENTE m2 683.61 6.33 4,327.25 4,327.25 100% 0% 0% 0% 0%
07.02.01.02.06 DEMOLICION DE VEREDAS DE CONCRETO m2 55.65 15.91 885.39 885.39 100% 0% 0% 0% 0%
07.02.01.02.07 DEMOLICION DE MUROS m3 34.41 12.66 435.63 435.63 100% 0% 0% 0% 0%
07.02.01.02.08 DEMOLICION DE PISO DE CONCRETO m3 99.69 9.06 903.19 903.19 100% 0% 0% 0% 0%
07.02.01.02.09 DEMOLICION DE PORTADA DE CONCRETO ARMADO m2 9.60 56.37 541.15 541.15 100% 0% 0% 0% 0%
07.02.01.03 RELLENO 18,222.96 18,222.96 100% 0.00 0% 0.00 0% 0.00 0% 0.00 0%
07.02.01.03.01 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO (RIPIO) m3 307.87 16.43 5,058.30 5,058.30 100% 0% 0% 0% 0%
07.02.01.03.02 NIVELACION Y APISONADO DE TERRENO CON EQUIPO LIVIANO m2 429.13 4.93 2,115.61 2,115.61 100% 0% 0% 0% 0%
07.02.01.03.03 ACARREO MATERIAL EXEDENTE HASTA UNA DISTANCIA PROMEDIO DE 30.00 ML m3 272.01 21.35 5,807.41 5,807.41 100% 0% 0% 0% 0%
07.02.01.03.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO DIST.= 2.5 km m3 272.01 19.27 5,241.63 5,241.63 100% 0% 0% 0% 0%
07.02.02 OBRAS DE CONCRETO SIMPLE 9,774.06 0.00 0% 0.00 0% 0.00 0% 9,774.06 100% 0.00 0%
07.02.02.01 SARDINEL CUNETA DE CONCRETO 4,269.96 0.00 0% 0.00 0% 0.00 0% 4,269.96 100% 0.00 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
07.02.02.01.01 CONCRETO EN SARDINEL CUNETA F'c=175 KG/CM2 m3 5.87 462.27 2,713.52 0% 0% 0% 2,713.52 100% 0%
07.02.02.01.02 ENCOFRADO Y DESENCOFRADO EN SARDINEL CUNETA m2 30.90 50.37 1,556.43 0% 0% 0% 1,556.43 100% 0%
07.02.02.02 PATIO DE CONCRETO 5,504.10 0.00 0% 0.00 0% 0.00 0% 5,504.10 100% 0.00 0%
07.02.02.02.01 CONCRETO EN PATIO f'c=175 kg/cm2 m3 11.04 410.23 4,528.94 0% 0% 0% 4,528.94 100% 0%
07.02.02.02.02 ENCOFRADO Y DESENCOFRADO EN PATIO m2 19.36 50.37 975.16 0% 0% 0% 975.16 100% 0%
07.02.03 OBRAS DE CONCRETO ARMADO 590.48 0.00 0% 0.00 0% 0.00 0% 590.48 100% 0.00 0%
07.02.03.01 PEDESTAL DE ASTA DE BANDERA 590.48 0.00 0% 0.00 0% 0.00 0% 590.48 100% 0.00 0%
07.02.03.01.01 CONCRETO EN ASTA f'c=175 kg/cm2 m3 0.47 382.67 179.85 0% 0% 0% 179.85 100% 0%
07.02.03.01.02 ENCOFRADO Y DESENCOFRADO EN ASTA m2 2.71 50.08 135.72 0% 0% 0% 135.72 100% 0%
07.02.03.01.03 ACERO DE REFUERZO F'Y=4200 KG/CM2, GRADO 60 kg 48.23 5.70 274.91 0% 0% 0% 274.91 100% 0%
07.03 ARQUITECTURA 9,727.83 0.00 0% 0.00 0% 0.00 0% 9,727.83 100% 0.00 0%
07.03.01 REVOQUES ENLUCIDOS Y MOLDURAS 1,827.18 0.00 0% 0.00 0% 0.00 0% 1,827.18 100% 0.00 0%
07.03.01.01 TARRAJEO EN SARDINELES CON MZC. C:A .1:5 E=1.5CM. m2 13.65 23.31 318.18 0% 0% 0% 318.18 100% 0%
07.03.01.02 TARRAJEO CON IMPERMEABILIZANTES m2 42.01 35.92 1,509.00 0% 0% 0% 1,509.00 100% 0%
07.03.02 PISOS Y PAVIMENTOS 432.63 0.00 0% 0.00 0% 0.00 0% 432.63 100% 0.00 0%
07.03.02.01 PISO DE CONCRETO FROTACHADO COLOREADO Y BRUÑADO m2 23.36 18.52 432.63 0% 0% 0% 432.63 100% 0%
07.03.03 CARPINTERIA METALICA Y HERRERIA 5,599.91 0.00 0% 0.00 0% 0.00 0% 5,599.91 100% 0.00 0%
07.03.03.01 TACHO DE BASURA SEGUN DISEÑO / INCLUIDO INSTALACION und 2.00 195.16 390.32 0% 0% 0% 390.32 100% 0%
07.03.03.02 ASTA DE BANDERA DE ACERO GALVANIZADO SEGÚN DISEÑO und 3.00 416.74 1,250.22 0% 0% 0% 1,250.22 100% 0%
07.03.03.03 REJILLAS METALICAS EN CUNETAS ml 62.03 63.83 3,959.37 0% 0% 0% 3,959.37 100% 0%
07.03.04 VARIOS 1,868.11 0.00 0% 0.00 0% 0.00 0% 1,868.11 100% 0.00 0%
07.03.04.01 JUNTA DE DILATACION EN RELLENA CON BREA Y ARENA 1/2" C/3MT. ml 95.40 15.88 1,514.95 0% 0% 0% 1,514.95 100% 0%
07.03.04.02 LIMPIEZA FINAL DE OBRA m2 436.00 0.81 353.16 0% 0% 0% 353.16 100% 0%
07.04 INSTALACIONES ELECTRICAS 3,187.61 0.00 0% 0.00 0% 0.00 0% 3,187.61 100% 0.00 0%
07.04.01 MOVIMIENTO DE TIERRAS 345.85 0.00 0% 0.00 0% 0.00 0% 345.85 100% 0.00 0%
07.04.01.01 EXCAVACION DE ZANJAS PARA TUBERIAS (30x40 CM) m3 5.42 32.01 173.49 0% 0% 0% 173.49 100% 0%
07.04.01.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO EN ZANJAS m3 5.42 31.80 172.36 0% 0% 0% 172.36 100% 0%
07.04.02 CANALIZACION Y/O TUBERIA 167.35 0.00 0% 0.00 0% 0.00 0% 167.35 100% 0.00 0%
07.04.02.01 TUBERIA Ø 20 mm PVC-SAP (ENTERRADO) ml 5.75 12.33 70.90 0% 0% 0% 70.90 100% 0%
07.04.02.02 TUBERIA Ø 25 mm PVC-SAP (ENTERRADO) ml 7.50 12.86 96.45 0% 0% 0% 96.45 100% 0%
07.04.03 CONDUCTORES Y/O CABLES 1,261.18 0.00 0% 0.00 0% 0.00 0% 1,261.18 100% 0.00 0%
07.04.03.01 CONDUCTOR 10mm2 N2xOH ml 1.05 13.96 14.66 0% 0% 0% 14.66 100% 0%
07.04.03.02 CONDUCTOR 6mm2 N2xOH ml 100.08 11.34 1,134.91 0% 0% 0% 1,134.91 100% 0%
07.04.03.03 CONDUCTOR 4mm2 N2xOH ml 13.20 8.19 108.11 0% 0% 0% 108.11 100% 0%
07.04.03.04 CONDUCTOR 10mm2 Cu DESNUDO ml 2.40 1.46 3.50 0% 0% 0% 3.50 100% 0%
07.04.04 TABLEROS ELECTRICOS Y ACCESORIOS 771.96 0.00 0% 0.00 0% 0.00 0% 771.96 100% 0.00 0%
07.04.04.01 TABLERO GENERAL 427.28 0% 0% 0% 427.28 100% 0%
07.04.04.01.01 TABLERO DE DISTRIBUCION PARA LLAVES TIPO RIEL 12 POLOS pza 2.00 213.64 427.28 0% 0% 0% 427.28 100% 0%
07.04.04.02 LLAVES DE INTERRUPCION 344.68 0% 0% 0% 344.68 100% 0%
07.04.04.02.01 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 20 A und 2.00 89.17 178.34 0% 0% 0% 178.34 100% 0%
07.04.04.02.02 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 40 A und 2.00 83.17 166.34 0% 0% 0% 166.34 100% 0%
07.04.05 ADITAMENTOS VARIOS 641.28 0.00 0% 0.00 0% 0.00 0% 641.28 100% 0.00 0%
07.04.05.01 BUZON DE CONCRETO TIPO A DE 30x30x20 pza 2.00 77.66 155.32 0% 0% 0% 155.32 100% 0%
07.04.05.02 MEDIDOR DE LUZ MONOFASICO pza 1.00 150.00 150.00 0% 0% 0% 150.00 100% 0%
07.04.05.03 POZO DE CONEXION A TIERRA und 1.00 335.96 335.96 0% 0% 0% 335.96 100% 0%
07.05 INSTALACIONES SANITARIAS 7,326.17 0.00 0% 0.00 0% 0.00 0% 7,326.17 100% 0.00 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
07.05.01 SISTEMA DE DESAGUE 2,510.57 0.00 0% 0.00 0% 0.00 0% 2,510.57 100% 0.00 0%
07.05.01.01 MOVIMIENTO DE TIERRAS 486.88 0.00 0% 0.00 0% 0.00 0% 486.88 100% 0.00 0%
07.05.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIAS DE DESAGUE SECCION 0,30 m, altura variable m3 6.80 50.25 341.70 0% 0% 0% 341.70 100% 0%
07.05.01.01.02 RELLENO CON MATERIAL PROPIO P/TUBERIA DE DESAGUE m3 6.80 21.35 145.18 0% 0% 0% 145.18 100% 0%
07.05.01.02 REDES COLECTORAS 756.29 0.00 0% 0.00 0% 0.00 0% 756.29 100% 0.00 0%
07.05.01.02.01 RED COLECTORA TUBERIA PVC SAL 2" ml 2.00 16.11 32.22 0% 0% 0% 32.22 100% 0%
07.05.01.02.02 RED COLECTORA TUBERIA PVC SAL 4" ml 34.01 21.29 724.07 0% 0% 0% 724.07 100% 0%
07.05.01.03 CAMARAS DE INSPECCION 1,267.40 0.00 0% 0.00 0% 0.00 0% 1,267.40 100% 0.00 0%
07.05.01.03.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" CON TAPA pza 5.00 253.48 1,267.40 0% 0% 0% 1,267.40 100% 0%
07.05.02 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 4,815.59 0.00 0% 0.00 0% 0.00 0% 4,815.59 100% 0.00 0%
07.05.02.01 SALIDA PARA AGUA 56.61 0.00 0% 0.00 0% 0.00 0% 56.61 100% 0.00 0%
07.05.02.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 1.00 56.61 56.61 0% 0% 0% 56.61 100% 0%
07.05.02.02 RED DE ALIMENTACION 1,016.30 0.00 0% 0.00 0% 0.00 0% 1,016.30 100% 0.00 0%
07.05.02.02.01 EXCAVACION DE ZANJAS PARA TUBERIAS DE AGUA (0.30x0.40) m3 9.46 32.01 302.81 0% 0% 0% 302.81 100% 0%
07.05.02.02.02 RELLENO CON MATERIAL PROPIO P/TUBERIA DE AGUA m3 9.46 31.80 300.83 0% 0% 0% 300.83 100% 0%
07.05.02.02.03 RED DE DISTRIBUCION DE AGUA TUBERIA PVC-SAP 3/4" ml 47.30 5.48 259.20 0% 0% 0% 259.20 100% 0%
07.05.02.02.04 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP ml 23.50 6.53 153.46 0% 0% 0% 153.46 100% 0%
07.05.03 ACCESORIOS 950.08 0.00 0% 0.00 0% 0.00 0% 950.08 100% 0.00 0%
07.05.03.01 CODO PVC-SAP 1/2" PARA AGUA pza 1.00 11.42 11.42 0% 0% 0% 11.42 100% 0%
07.05.03.02 CODO PVC-SAP 3/4"x90° PARA AGUA und 10.00 11.92 119.20 0% 0% 0% 119.20 100% 0%
07.05.03.03 TEE PVC SAP DE 3/4" PARA AGUA und 3.00 12.42 37.26 0% 0% 0% 37.26 100% 0%
07.05.03.04 REDUCCION PVC-SAP DE 3/4" A 1/2" PARA AGUA und 5.00 156.44 782.20 0% 0% 0% 782.20 100% 0%
07.05.04 LLAVES Y VALVULAS 546.35 0.00 0% 0.00 0% 0.00 0% 546.35 100% 0.00 0%
07.05.04.01 MEDIDOR DE AGUA und 1.00 189.87 189.87 0% 0% 0% 189.87 100% 0%
07.05.04.02 VALVULA CHECK DE BRONCE 1/2" pza 2.00 87.62 175.24 0% 0% 0% 175.24 100% 0%
07.05.04.03 VALVULA DE COMPUERTA DE BRONCE UNION ROSCADA 1/2" und 2.00 90.62 181.24 0% 0% 0% 181.24 100% 0%
07.05.05 CAMARAS DE INSPECCION 366.96 0.00 0% 0.00 0% 0.00 0% 366.96 100% 0.00 0%
07.05.05.01 CAJA DE CONCRETO PARA VALVULAS 12" X 12" CON TAPA und 4.00 91.74 366.96 0% 0% 0% 366.96 100% 0%
07.05.06 PIEZAS VARIAS 221.31 0.00 0% 0.00 0% 0.00 0% 221.31 100% 0.00 0%
07.05.06.01 CAJA DE CONCRETO P/MEDIDOR 12" X 12" CON TAPA und 1.00 158.48 158.48 0% 0% 0% 158.48 100% 0%
07.05.06.02 GRIFO CROMADO DE 1/2" und 1.00 62.83 62.83 0% 0% 0% 62.83 100% 0%
07.05.07 VARIOS 1,657.98 0.00 0% 0.00 0% 0.00 0% 1,657.98 100% 0.00 0%
07.05.07.01 SERVICIO, ELABORACION DE PLAN DE MONITOREO ARQUEOLOGICO glb 1.00 1,500.00 1,500.00 0% 0% 0% 1,500.00 100% 0%
07.05.07.02 PRUEBA HIDRAULICA + DESINFECCION TUBERIA ml 47.30 3.34 157.98 0% 0% 0% 157.98 100% 0%
08 TANQUE ELEVADO 3,034.49 0.00 0% 0.00 0% 0.00 0% 3,034.49 100% 0.00 0%
08.01 INSTALACIONES SANITARIAS 3,034.49 0.00 0% 0.00 0% 0.00 0% 3,034.49 100% 0.00 0%
08.01.01 APARATOS Y ACCESORIOS SANITARIOS 2,250.00 0.00 0% 0.00 0% 0.00 0% 2,250.00 100% 0.00 0%
08.01.01.01 TANQUE ELEVADO DE POLIETILENO DE 600 Lts. und 1.00 2,250.00 2,250.00 0% 0% 0% 2,250.00 100% 0%
08.01.02 REDES DE DISTRIBUCION 201.97 0.00 0% 0.00 0% 0.00 0% 201.97 100% 0.00 0%
08.01.02.01 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP ml 16.10 6.53 105.13 0% 0% 0% 105.13 100% 0%
08.01.02.02 TUBERIA DE REBOSE DE TANQUE ELEVADO PVC SAL 2" ml 8.60 11.26 96.84 0% 0% 0% 96.84 100% 0%
08.01.03 VALBULAS 268.86 0.00 0% 0.00 0% 0.00 0% 268.86 100% 0.00 0%
08.01.03.01 VALVULA CHECK DE BRONCE 1/2" pza 1.00 87.62 87.62 0% 0% 0% 87.62 100% 0%
08.01.03.02 VALVULA DE COMPUERTA DE BRONCE UNION ROSCADA 1/2" und 2.00 90.62 181.24 0% 0% 0% 181.24 100% 0%
08.01.04 ACCESORIOS 313.66 0.00 0% 0.00 0% 0.00 0% 313.66 100% 0.00 0%
08.01.04.01 CODO PVC-SAP 2"x90° pza 5.00 28.96 144.80 0% 0% 0% 144.80 100% 0%
PROYECTO:
CREACION DE LA INSTITUCION EDUCATIVA DEL NIVEL INICIAL N° 143 DEL BARRIO DE YANANACO DISTRITO DE HUANCAVELICA - PROVINCIA DE
HUANCAVELICA - DEPARTAMENTO DE HUANCAVELICA
FECHA
ENTIDAD : OCTUBRE - 2019 DEPARTAMENTO : Huancavelica
RESPONSABL : MUNICIPALIDAD PROVINCIAL DE HUANCAVELICA PROVINCIA : Huancavelica
E DISTRITO : Huancavelica

P. Unit. Parcial Mes 1 Mes 2 Mes 3 Mes 4 Mes 5


Item Descripción Und Metrado
S/. S/. Parcial % Parcial % Parcial %
08.01.04.03 TEE PVC-SAP DE 3/4" und 1.00 12.42 12.42 0% 0% 0% 12.42 100% 0%
08.01.04.04 REDUCCION PVC-SAP DE 3/4" A 1/2" und 1.00 156.44 156.44 0% 0% 0% 156.44 100% 0%
09 EQUIPAMIENTO DE MOBILIARIO ESCOLAR Y MODULO DE COMPUTO 117,122.00 0.00 0% 0.00 0% 0% 0% 117,122.00 100% 0.00 0%
09.01 MODULO ADMINISTRATIVO 9,175.00 0.00 0% 0.00 0% 0% 0% 9,175.00 100% 0.00 0%
09.01.01 EQUIPAMIENTO DIRECCION glb 1.00 4,310.00 4,310.00 0% 0% 0% 4,310.00 100% 0%
09.01.02 EQUIPAMIENTO TOPICO glb 1.00 4,865.00 4,865.00 0% 0% 0% 4,865.00 100% 0%
09.02 SALA DE USOS MULTIPLES 107,947.00 0.00 0% 0.00 0% 0% 0% 107,947.00 100% 0.00 0%
09.02.01 EQUIPAMIENTO SALA DE USOS MULTIPLES glb 1.00 4,765.00 4,765.00 0% 0% 0% 4,765.00 100% 0%
09.02.02 AULAS (03 AULAS) 41,541.00 0% 0% 0% 41,541.00 100% 0.00 0%
09.02.02.01 EQUIPAMIENTO AULA glb 3.00 13,847.00 41,541.00 0% 0% 0% 41,541.00 100% 0%
09.02.03 COCINA Y COMEDOR 7,635.00 0.00 0% 0.00 0% 0% 0% 7,635.00 100% 0.00 0%
09.02.03.01 EQUIPAMIENTO COCINA-DESPENSA glb 1.00 5,055.00 5,055.00 0% 0% 0% 5,055.00 100% 0%
09.02.03.02 EQUIPAMIENTO COMEDOR glb 1.00 2,580.00 2,580.00 0% 0% 0% 2,580.00 100% 0%
09.02.04 EQUIPAMIENTO INSTITUCIONAL 54,006.00 0.00 0% 0.00 0% 0% 0% 54,006.00 100% 0.00 0%
09.02.04.01 MODULO COMUNICACION glb 3.00 3,390.00 10,170.00 0% 0% 0% 10,170.00 100% 0%
09.02.04.02 MODULO MATEMATICA glb 3.00 4,162.00 12,486.00 0% 0% 0% 12,486.00 100% 0%
09.02.04.03 MODULO DE CIENCIA Y AMBIENTE glb 3.00 2,270.00 6,810.00 0% 0% 0% 6,810.00 100% 0%
09.02.04.04 MODULO DE PSICOMOTRICIDAD glb 3.00 1,532.00 4,596.00 0% 0% 0% 4,596.00 100% 0%
09.02.04.05 MODULO DE BIBLIOTECA AULA glb 3.00 1,648.00 4,944.00 0% 0% 0% 4,944.00 100% 0%
09.02.04.06 MODULO DE JUEGOS INFANTILES glb 1.00 15,000.00 15,000.00 0% 0% 0% 15,000.00 100% 0%
10 CAPACITACION EDUCATIVA 10,000.00 0% 0% 0% 10,000.00 100% 0.00 0%
10.01 CAPACITACION EDUCATIVA glb 1.00 10,000.00 10,000.00 0% 0% 0% 10,000.00 100% 0%
11 MITIGACION AMBIENTAL 12,877.41 0% 0% 0% 12,877.41 100% 0%
11.01 JARDINERIA 1,888.80 0.00 0% 0.00 0% 0% 0% 1,888.80 100% 0.00 0%
11.01.01 ELIMINACION DE DESECHOS FINALIZADA LA OBRA glb 1.00 1,648.08 1,648.08 0% 0% 0% 1,648.08 100% 0%
11.01.02 APILAMIENTO DE DESECHOS FINALES DE OBRA glb 1.00 240.72 240.72 0% 0% 0% 240.72 100% 0%
11.02 ELIMINACION DE DESECHOS Y DESPERDICIOS 10,988.61 0.00 0% 0.00 0% 0% 0% 10,988.61 100% 0.00 0%
11.02.01 SEMBRIO DE PLANTAS HORNAMENTALES glb 20.00 15.11 302.20 0% 0% 0% 302.20 100% 0%
11.02.02 SEMBRIO DE GRASS glb 300.00 4.13 1,239.00 0% 0% 0% 1,239.00 100% 0%
11.02.03 PREPARACION DE TIERRA P/ SEMBRIO DE PLANTAS HORNAMENTALES Y GRASS glb 300.00 30.74 9,222.00 0% 0% 0% 9,222.00 100% 0%
11.02.04 EXCAVACION DE ZANJAS P/SEMBRIO DE PLANTAS HORNAMENTALES glb 4.40 51.23 225.41 0% 0% 0% 225.41 100% 0%
12 PLAN DE MONITOREO ARQUEOLOGICO 12,500.00 0% 0% 0% 12,500.00 100% 0%
12.01 TRAMITES DOCUMENTARIOS glb 1.00 2,500.00 2,500.00 0.00 0% 0.00 0% 0% 0% 2,500.00 100% 0.00 0%
12.02 ARQUEOLOGO glb 1.00 10,000.00 10,000.00 0.00 0% 0.00 0% 0% 0% 10,000.00 100% 0.00 0%
COSTO DIRECTO S/. 793,940.96
CALENDARIO DE UTILIZACION DE EQUIPO

Cantidad PLAZO DE EJECUCION


Item Descripción
Und Semana 1 Semana 2 Semana 3 Semana 4

MANO DE OBRA

1.1 CAPATAZ 1 1 1 1

1.2 OPERARIO 1 1 1 1

1.3 OFICIAL 1 1 1 1

1.4 PEON 1 1 1 1

1.5 TOPOGRAFO 1 1 1 1 1
1.6 MANO DE OBRA - T 2 2 2 2 2
1.7 MANO DE OBRA - LT 1 1 1 1 1
1.8 MANO DE OBRA-A 1 1 1 1 1
1.9 MANO DE OBRA - SEÑALIZACION 2 2 2
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y
1.10 1 1 1 1 1
SALUD EN EL TRABAJO
1.11 MANO DE OBRA - PROTECCION COLECTIVA 1 1 1
1.12 CHARLAS DE CAPACITACION EN SEGURIDAD AL PERSONAL 1 1 1 1 1
1.13 MANO DE OBRA - CAPACITACION EN SEGURIDAD 1 1 1 1 1
MATERIALES
2.1 ALAMBRE NEGRO Nro. 8 1 1 1 1 1
2.2 ALAMBRE NEGRO Nro.16 1 1 1 1
2.3 CLAVOS CON CABEZA DE 2 1/2", 3", 4" 1 1 1 1 1
2.4 CLAVOS CON CABEZA DE 3" 1 1 1 1 1
2.5 CLAVOS CON CABEZA DE 4" 1 1 1
2.6 ACERO 1 1 1
2.7 ARENA GRUESA 1 1 1
2.8 ARENA FINA 1 1 1 1
2.9 PIEDRA CHANCADA DE 1/2” Y 3/4" 1 1 1
2.10 AGUA 1 1 1 1 1
2.11 AGUA 1 1 1 1
2.12 ASFALTO LIQUIDO RC-250 1 1 1 1
2.13 MEZCLA ASFALTICA EN CALIENTE 1 1 1
2.14 TRANSPORTE DE MEZCLA ASFALTICA C/VOLQUETE 10M3 1 1 1 1
2.15 LADRILLO KK TIPO IV 24X13X09 CM 1 1 1 1
2.16 CEMENTO PORTLAND TIPO I (42.5kg) 1 1 1 1
2.17 PEGAMENTO PARA TUBERIA PVC 1 1 1 1
2.18 CAL (BOLSA X 20 kg) 1 1 1 1
2.19 CORDEL 1 1 1 1
2.20 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO 1 1 1 1
2.21 EXTINTOR DE POLVO SECO 1 1 1 1
2.22 DISCO DE CORTE DE 16" 1 1
2.23 CASCO DE PROTECCION 1 1
2.24 BOTINES DE CUERO 1 1
2.25 TAPONES AUDITIVOS 1 1
2.26 GUANTES DE CUERO 1 1
2.27 RESPIRADOR CONTRA POLVO 1 1
2.28 CHALECOS REFLECTIVOS 1 1
2.29 LENTES DE PROTECCION 1 1
2.30 MATERIALES - PROTECCION COLECTIVA 1 1
2.31 MATERIALES - SEÑALIZACION SEGURIDAD 1 1
2.32 CAMILLA 1 1
2.33 BOTIQUIN CON MEDICINA 1
2.34 CILINDRO VACIO 1
2.35 TAPA DE CONCRETO C/MARCO F°F PARA BUZON ø 0.60m 1
2.36 GASOLINA 95 OCTANOS 1
2.37 HORMIGON 1
2.38 AFIRMADO 1
2.39 MADERA TORNILLO 1
2.40 MADERA TORNILLO-A 1
2.41 KEROSENE INDUSTRIAL 1
2.42 TUBO PVC-SAP - 8" (5M) 1
2.43 TUBO PVC-SAP-4" (3M) 1
2.44 TUBO PVC-SAP - 6" (5M) 1
2.45 TAPON PVC SAL P/DESAGUE 08” 1
EQUIPOS 1
3.1 HERRAMIENTA 1
3.2 HERRAMIENTA-T 1
3.3 HERRAMIENTA - LT 1
3.4 COMP. NEUMATICA - 93 HP - 335/375 PCM 1
3.5 MARTILLO NEUMATICO - 25/29 KG 1
3.6 RETROEXCAVADORA S/LLANT. 62 HP -1 YD3 1
3.7 TRACTOR DE TIRO DE 60HP 1
3.8 PLANCHA COMPACTADORA VIBRAT. 4.0 HP 1
3.9 RODILLO NEUMATICO AUTOP. 81-100HP 5.5-20T 1
3.10 RODILLO TANDEM ESTATIC AUT 58-70HP 8-10T 1
3.11 MEZCLADORA DE CONC.(TAMBOR) 11 P3,18 HP 1
3.12 VIBRADOR A GASOLINA Y 1 3/4", 4 HP 1
3.13 CORTADORA DE CONCRETO 13 HP 1
3.14 CAMION VOLQUETE 4x2, 210/280 HP, 8 M3 1
3.15 TEODOLITO Y MIRA 1
3.16 BARREDORA MECANICA 10-20HP
3.17 PAVIMENTADORA SOBRE ORUGAS 105HP 10-16'
3.18 CAMION IMPRIMADOR 6x2 178-210HP 2000 GLN
CRONOGRAMA DE ADQUISICION DE MATERIALES

Descripción P. Unit. Parcial PLAZO DE EJECUCION


Item Und Cant.
S/. S/. Semana 1 Semana 2 Semana 3 Semana 4

MANO DE OBRA

1.1 CAPATAZ H-H 85.53 20.06 1715.73

1.2 OPERARIO H-H 486.37 18.24 8871.40

1.3 OFICIAL H-H 147.67 15.28 2256.36

1.4 PEON H-H 1101.79 13.74 15138.61

1.5 TOPOGRAFO H-H 2.99 21.07 63.03

1.6 MANO DE OBRA - T GLB 1.00 70.00 70.00

1.7 MANO DE OBRA - LT GLB 1.00 315.00 315.00

1.8 MANO DE OBRA-A GLB 1.00 360.00 360.00

1.9 MANO DE OBRA - SEÑALIZACION GLB 1.00 102.95 102.95


ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE
1.10 GLB 1.00 500.00 500.00
SEGURIDAD Y SALUD EN EL TRABAJO
1.11 MANO DE OBRA - PROTECCION COLECTIVA GLB 1.00 118.15 118.15

1.12 CHARLAS DE CAPACITACION EN SEGURIDAD AL PERSONAL GLB 26.00 30.00 780.00

1.13 MANO DE OBRA - CAPACITACION EN SEGURIDAD GLB 260.00 0.30 78.00

30369.23

MATERIALES

2.1 ALAMBRE NEGRO Nro. 8 kg 9.79 2.47 24.18

2.2 ALAMBRE NEGRO Nro.16 kg 28.91 2.47 71.40

2.3 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 2.32 2.80 6.49

2.4 CLAVOS CON CABEZA DE 3" kg 0.77 2.80 2.15

2.5 CLAVOS CON CABEZA DE 4" kg 6.55 2.80 18.35

2.6 ACERO kg 622.06 2.40 1492.94

2.7 ARENA GRUESA m3 28.10 58.60 1646.83

2.8 ARENA FINA m3 1.31 102.50 134.48

2.9 PIEDRA CHANCADA DE 1/2” Y 3/4" m3 10.47 70.64 739.74

2.10 AGUA m3 27.87 5.68 158.30

2.11 AGUA GLB 1.00 300.00 300.00

2.12 ASFALTO LIQUIDO RC-250 gal 39.46 9.51 375.29

2.13 MEZCLA ASFALTICA EN CALIENTE m3 16.03 320.00 5130.11

2.14 TRANSPORTE DE MEZCLA ASFALTICA C/VOLQUETE 10M3 m3 16.03 46.64 747.71

2.15 LADRILLO KK TIPO IV 24X13X09 CM und 50.00 0.85 42.50

2.16 CEMENTO PORTLAND TIPO I (42.5kg) bl 182.43 16.95 3092.22

2.17 PEGAMENTO PARA TUBERIA PVC gal 4.11 97.71 401.44

2.18 CAL (BOLSA X 20 kg) bl 16.81 8.43 141.69

2.19 CORDEL M 63.87 0.15 9.58

2.20 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO gal 2.50 13.56 33.85

2.21 EXTINTOR DE POLVO SECO und 1.00 129.80 129.80

2.22 DISCO DE CORTE DE 16" und 0.88 550.85 487.12

2.23 CASCO DE PROTECCION und 10.00 9.24 92.40

2.24 BOTINES DE CUERO par 10.00 44.83 448.30

2.25 TAPONES AUDITIVOS par 10.00 2.12 21.20


CRONOGRAMA DE ADQUISICION DE MATERIALES

Descripción P. Unit. Parcial PLAZO DE EJECUCION


Item Und Cant.
S/. S/. Semana 1 Semana 2 Semana 3 Semana 4

2.26 GUANTES DE CUERO par 10.00 12.63 126.30

2.27 RESPIRADOR CONTRA POLVO und 10.00 2.46 24.60

2.28 CHALECOS REFLECTIVOS und 10.00 7.54 75.40

2.29 LENTES DE PROTECCION und 10.00 5.34 53.40

2.30 MATERIALES - PROTECCION COLECTIVA GLB 1.00 1181.52 1181.52

2.31 MATERIALES - SEÑALIZACION SEGURIDAD GLB 1.00 1029.48 1029.48

2.32 CAMILLA und 1.00 250.00 250.00

2.33 BOTIQUIN CON MEDICINA und 1.00 296.61 296.61

2.34 CILINDRO VACIO und 1.00 67.80 67.80

2.35 TAPA DE CONCRETO C/MARCO F°F PARA BUZON ø 0.60m und 5.00 300.00 1500.00

2.36 GASOLINA 95 OCTANOS gal 88.43 11.02 974.52

2.37 HORMIGON m3 0.02 40.14 0.80

2.38 AFIRMADO m3 53.92 33.60 1811.68

2.39 MADERA TORNILLO p2 252.66 4.40 1111.69

2.40 MADERA TORNILLO-A GLB 1.00 240.00 240.00

2.41 KEROSENE INDUSTRIAL gal 9.87 9.55 94.22

2.42 TUBO PVC-SAP - 8" (5M) M 193.20 23.19 4480.26

2.43 TUBO PVC-SAP-4" (3M) M 18.49 7.42 137.18

2.44 TUBO PVC-SAP - 6" (5M) M 17.03 15.40 262.20

2.45 TAPON PVC SAL P/DESAGUE 08” und 4.42 36.76 162.54

29628.27

EQUIPOS

3.1 HERRAMIENTA %MO 958.30

3.2 HERRAMIENTA-T GLB 1.00 280.00 280.00

3.3 HERRAMIENTA - LT GLB 1.00 35.00 35.00

3.4 COMP. NEUMATICA - 93 HP - 335/375 PCM h-m 2.71 99.81 270.11

3.5 MARTILLO NEUMATICO - 25/29 KG h-m 2.71 4.49 12.16

3.6 RETROEXCAVADORA S/LLANT. 62 HP -1 YD3 h-m 6.85 124.08 849.87

3.7 TRACTOR DE TIRO DE 60HP h-m 0.25 57.69 14.23

3.8 PLANCHA COMPACTADORA VIBRAT. 4.0 HP h-m 78.60 24.16 1898.92

3.9 RODILLO NEUMATICO AUTOP. 81-100HP 5.5-20T h-m 1.21 127.67 154.29

3.10 RODILLO TANDEM ESTATIC AUT 58-70HP 8-10T h-m 1.21 93.28 112.73

3.11 MEZCLADORA DE CONC.(TAMBOR) 11 P3,18 HP h-m 14.31 10.65 152.39

3.12 VIBRADOR A GASOLINA Y 1 3/4", 4 HP h-m 12.48 4.95 61.78

3.13 CORTADORA DE CONCRETO 13 HP h-m 60.78 10.00 607.82

3.14 CAMION VOLQUETE 4x2, 210/280 HP, 8 M3 h-m 3.87 196.77 760.75

3.15 TEODOLITO Y MIRA h-m 2.99 13.46 40.27

3.16 BARREDORA MECANICA 10-20HP h-m 0.25 46.79 11.54

3.17 PAVIMENTADORA SOBRE ORUGAS 105HP 10-16' h-m 1.21 133.17 160.94

3.18 CAMION IMPRIMADOR 6x2 178-210HP 2000 GLN h-m 0.25 122.29 30.16

6411.24