Documentos de Académico
Documentos de Profesional
Documentos de Cultura
CAL ESTRIBO PTE LA ANGELICA L 20m
CAL ESTRIBO PTE LA ANGELICA L 20m
FECHA: NOVIEMBRE/92
DATOS
qa = 10 t/m2 H = 3.00
fc = 210 Kg/cm2 B = 2.30 2
b = 0.30 Ph = Ka.Pes.H /2 = 2.550
b' = 0.60
Ka = 0.33 Mv = Ph H/3 = 2.550
Pes= 1.70
Peh= 2.20
FSD= 0.60 We/Ph = 2.859
- -------- ---------- - ----------- - ------- ----------- - FSV= Me/Mv = 5.936
| PESO | B.P | MOMENTOS |
| -------- ---------- | ----------- | ------- ----------- | MR = Me - Mv = 12.586
| W1 = 1.980 | 0.400 | 0.792 | X = MR/We = 1.036
| W2 = 1.980 | 0.750 | 1.485 | e = B/2 - X = 0.114
| W3 = 4.620 | 1.367 | 6.314 | B/3= B/3 = 0.767
| W4 = 3.570 | 1.833 | 6.545 | B/6= B/6 = 0.383
| -------- ---------- | ----------- | ------- ----------- |
| We = 12.150 | | Me = 15.136 | Si e<BB/6 q1= We/B (1+6e/B) < qa
- -------- ---------- - ----------- - ------- ----------- - Si e>B/6 q2=2We/(3L(b/2-e))< qa
q = q1 o q2 = 6.855
R esta en el tercio medio central
SE ACEPTA EL CALCULO :
A = 3.9
CALCULO DE MUROS DE GRAVEDAD
UBICACION : PUENTE SAN MIGUEL
FECHA: MAYO/2012
0.20
α= 0 º
W3
4.00
Ph = Ka.Pes.H2 /2 = 7.897 W4 Relleno
W1
Mv = Ph H/3 = 13.688
/ / / / / W2
FSD= 0.60 We/Ph = 1.567
1.20
FSV= Me/Mv = 2.940
PESO B.P MOMENTOS W5
0.30
W1 = 2.352 1.150 2.705 MR = Me - Mv = 26.555
W2 = 1.764 1.350 2.381 X = MR/We = 1.288
W3 = 1.301 1.450 1.886 e = B/2 - X = 0.237 1.05 0.50 1.50
W4 = 13.010 2.300 29.922 B/3= B/3 = 1.017 51.80 cm
W5 = 2.196 1.525 3.349 B/6= B/6 = 0.508
DATOS:
We = 20.622 Me = 40.243 Si e<BB/6 q1= We/B (1+6e/B) < qa ƴs = 1.77 t/m3
Si e>B/6 q2=2We/(3L(b/2-e))< qa Ka = 0.33
q = q1 o q2 = 9.918 Suelo Tipo II
R esta en el tercio medio central 3.605
qa = 10 T/m2
SE ACEPTA EL CALCULO : f'c = 210 Kg/cm2
fy = 4200 Kg/cm2
Si FSD >=1.50 O.K Pe = 2.40 Kg/cm3
Si FSV >=1.50 O.K
Si qa >= q1 o q2
q1 O.K
q2 O.K
/ / / / / W2
1.20
DIMENSIONES DEL DIENTE NO ES NECESARIO W5
0.30
Kp = 10 Ka 3.300
Pp1= Kp H x Pes 7.009 Asumir este
0.30
Pp2= Kp Hd x Pes 8.762 valor
0.30
DISEÑO DEL DEDO /
/
7.745 t/m2
M = L2 (q1+2 q2)/6 = 5.068 t-m / m ### t/m2
Mu = 1,40 M 7.095 t-m / m
### t/m2
1.50
DISEÑO DEL TALON \
\
0.30
\
\
1 = H/3
1 1.63 0.4242 0.594 0.25 0.713 8.33 8.33 18 31
1.63
2 3.27 3.3935 4.751 0.35 4.072 11.67 11.67 16 60
3 4.90 11.4531 ### 0.45 10.69 15.00 15.00 16 60
4.00
2 = H/3
1.63
3 = H/3
1.63
1.20
/ / / / / PH = Kh x Pes x h
0.30
1.05 0.50 1.50
CALCULO DE MUROS DE GRAVEDAD
UBICACION : PUENTE SAN MIGUEL
FECHA: MAYO/2012
0.20
0.50
W3
4.00
Agua
Ph = Ka.Pes.H /2 = 7.897
2
4.40
4.40
W1
Mv = Ph H/3 = 13.688
W2
FSD= 0.60 We/Ph = 1.567
1.20
FSV= Me/Mv = 2.940
PESO B.P MOMENTOS W5
0.30
W1 = 2.352 1.150 2.705 MR = Me - Mv = 26.555
W2 = 1.764 1.350 2.381 X = MR/We = 1.288
W3 = 1.301 1.450 1.886 e = B/2 - X = 0.237
W4 = 13.010 2.300 29.922 B/3= B/3 = 1.017 1.05 0.50 1.50
W5 = 2.196 1.525 3.349 B/6= B/6 = 0.508 51.80 cm
DATOS:
We = 20.622 Me = 40.243 Si e<BB/6 q1= We/B (1+6e/B) < qa ƴs = = 1.77 t/m3
Si e>B/6 q2=2We/(3L(b/2-e))< qa Ka = 0.33
q = q1 o q2 = 9.918 Suelo Tipo II
R esta en el tercio medio central 3.605
qa = 10 T/m2
SE ACEPTA EL CALCULO : f'c = 210 Kg/cm2
fy = 4200 Kg/cm2
Si FSD >=1.50 O.K Peh = 2.40 Kg/cm3
Si FSV >=1.50 O.K
Si qa >= q1 o q2
q1 O.K
q2 O.K
/ / / / / W2
1.20
DIMENSIONES DEL DIENTE NO ES NECESARIO W5
0.30
Kp = 10 Ka 3.300
Pp1= Kp H x Pes 7.009
Pp2= Kp Hd x Pes 8.762
Pp = (Pp1+Pp2)/2 Hd 2.366
0.30
DISEÑO DEL DEDO /
/
7.745
M = L2 (q1+2 q2)/6 = 5.068 t-m / m ### t/m2
Mu = 1,40 M 7.095 t-m / m
###
1.50
DISEÑO DEL TALON \
\
0.30
\
\
1 = H/3
1 1.63 0.4242 0.594 0.25 0.713 8.33 8.33 18 31
1.63
2 3.27 3.3935 4.751 0.35 4.072 11.67 11.67 16 60
3 4.90 11.4531 ### 0.45 10.69 15.00 15.00 16 60
4.00
2 = H/3
1.63
3 = H/3
1.63
1.20
/ / / / /
0.30
1.05 0.50 1.50
α=
W4 Relleno
1.50
cm
Asumir este
0.30
valor
t/m2
t/m2
t/m2
PH = Kh x Pes x h
1.50
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD 7.50m No carrilles= 1 U
ANCHO TOTAL 4.00m (Ancho de via+Veredas)
FECHA =ABR 2015
### 0.55m
hv=1.10(0.15+L/18)= ###
###
###
###
###
###
###
###
###
###
5.00m
DATOS:
ɣhormigón = 2.40 T/m3
ɣm = 1.80 T/m3 ɸ = 30°
a) MUERTA INFRAESTRUCTURA
### 0.55m
###
P5
###
P6
P4
###
P7
###
P8
P3
###
P2
###
P1
A
2.45m 0.85m 1.70m
5.00m
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 7.50m
ANCHO TOTAL 4.00m (Ancho de via+Veredas)
FECHA =MARZO 2015
DATOS:
ɣh.a = 2.40 T/m3
ɣh.s = 2.20 T/m3
N de vig = 2 U
###
0
0.750m
Element Superestructura
Volumen WS YA MDSA
Capa de rodadura ### 0.660T/m 0.425m 0.281T-m
Aceras ### 0.870T/m 0.525m 0.457T-m
Tablero (Losa) ### 4.361T/m 0.285m 1.243T-m ### ###
Volados ### -0.442T/m 0.285m -0.126T-m
Vigas ### 0.326T/m 0.085m 0.028T-m
Cartelas ### 0.096T/m 0.137m 0.013T-m
5.872T/m 1.895T-m
Diafragmas Espesor Volumen P
Diafragma de apoyo 0.250m ### 2.85Ton
Diafragma central 0.250m ### -1.96Ton
0.89Ton
D = 3.27Ton
XA = 1.975m
MAD= 6.46T-m
Cortante: Momento:
Fr= P (1 + (a+b)/= 2.60 P Fr = S/1.80 = 4.17 P
Rd=5.00 T
Rt=7.50 T
Rt=7.50 T
4.00m 4.00m
-0.50m
RL = 78.24Ton
XA = 1.975m
MAL= 154.53T-m
d) FLOTACION (B)
### 0.55m
###
h' =
###
P5
###
P6
P4
###
###
###
P7
### P8
### P3
###
###
P1
A
2.45m 0.85m 1.70m
5.00m
MBA= 10.38T-m
e) VIENTO (W)
Longitud 6.950m
Altura = 0.650m
WD = ###
Viento W YA MWDA
Viga+tablero+acera 0.067T/m 2.817m 0.188T-m
0.188T-m
MWLA = 5.832T-m
No carril = 1 U
% C. viva= 5%
FL = ### YA = 4.830m
MFLA = -0.063T-m
h' = 0.600m
ɸ = 30° Ka = Tan2 (45-ɸ/2) Kp = 1/Ka
ɣm = 1.80 T/m3 Ka = 0.333 Kp = 3
H ( H + 3 h' )
Y = 3 ( H + 2 h' ) = 1.143m
MEtA = 4.320T-m
Carga (P = ###
MYA = ###
Y = MYA / P = 1.29m
MEQIA = 1.134T-m
WS = 5.872T/m
MDSA = 1.895T-m
D = ###
YS = ( H - hviga) + = 2.92m
MEQSA= 0.765T-m
rminar Factor de Rueda
1.80m ###
0.000m
###
###
###
###
###
###
7.100m
###
PROYECTO: PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
RESUMEN DE SOLICITACIONES
No TIPO SIMBOLO SENTIDO CARGA SIMBOLO MOMENTO
1 Muerta Superestructura D 3.270Ton MAD 6.458T-m
2 Viva Superestructura L ### MAL ###
3 Flotación B 4.444Ton MBA 10.382T-m
4 Viento D WD 0.067Ton MWDA 0.188T-m
5 Viento L WL 1.208Ton MWLA 5.832T-m
6 Fuerza Longitud. LF ### MFAL -0.063T-m
7 Empuje de tierra Et 3.780Ton MEtA 4.320T-m
8 Sismo Infraestructura EQI 0.881Ton MEQIA 1.134T-m
9 Sismo Superestructura EQS 0.262Ton MEQSA 0.765T-m
10 Muerta Infraestructura P ### MPXA 66.996T-m
ANALISIS DE ESTABILIDAD
CUMPLIMIENTO
Ϭmin FV FD FV FD OBSERVACION
5.52T/m2 13.105 2.325 OK OK Base estribo
11.55T/m2 50.371 13.107 OK OK
4.57T/m2 13.992 2.710 OK OK
8.12T/m2 21.448 9.920 OK OK
3.99T/m2 10.143 2.118 OK OK Base estribo
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 7.50m
ANCHO TOTAL 4.00m (Ancho de via+Veredas)
FECHA =MARZO 2015
DISEÑO DE LA PANTALLA
DATOS:
h' = 0.600m f'c = 280 Kg/cm2 fy = 4200 Kg/cm2
ɸ = 30° Ka = Tan2 (45-ɸ/2) Kp = 1/Ka
ɣm = 1.80 T/m3 Ka = 0.333 Kp = 3
Re = ###
E = 1/2 ɣs Ka H (H+2 h')= ###
H ( H + 3 h' )
Y = 3 ( H + 2 h' ) = 0.933m
### 0.55m
###
h' =
1ɸ16mm@25cm 1ɸ16mm@2
Hv = H viga
###
###
(4)
###
###
###
###
(3)
###
###
0.498m
###
1ɸ14mm@12.5cm
###
(2)
###
0.705m
1ɸ18mm@12.5cm
###
1ɸ14mm@10cm
1ɸ25mm@25cm (1)
###
1ɸ16mm@20cm
###
ARMADURA EN LA PANTALLA
H Y M Mu d K As As min
FRANJA ϼ As colocar
(m) (m) ( t-m /m ) 1.60 M ( m) (Kg/cm ) 2
cm2/m
1 2.40m 0.933m 2.419T-m 3.871T-m 0.780m 0.636m 0.0002 1.40cm2 26.00 26.00
2 1.70m 0.68m 1.012T-m 1.618T-m 0.635m 0.401m 0.0001 0.72cm2 21.17 21.17
3 0.70m 0.31m 0.123T-m 0.196T-m 0.428m 0.107m 0.0000 0.13cm2 14.28 14.28
4 0.40m 0.18m 0.035T-m 0.056T-m 0.230m 0.106m 0.0000 0.07cm2 7.67 7.67
ARMADURA DE DISTRIBUCION
H Y M Mu d K As As min
EJE ϼ norma As colocar
(m) (m) ( t-m /m ) 1.60 M ( m) (Kg/cm2) cm2/m
2 lados 0.602m 0.000m 0.0012 10.20cm2 0.00 10.20
E = 1/2 ɣs Ka H (H+2 =
h') ###
Mr = Me - = ###
X = Mr/nΣF = 2.152m
e = B/2 - X = 0.348m
Si e<B/6 q1= nΣF/B (1+6e/B) < = ###
Si e>B/6 q2=2nΣF/(3L(b/2-e))< = ###
1ɸ22mm@10cm
###
5.00m
###
###
###
###
###
###
###
###
=
M = L2 (q1+2 q2)/6 ###
4.32T/m2
###
###
###
###
M = q L2 / 2 - L2 (q1+2 q2) / 6
1ɸ22mm@10cm
1ɸ12mm@15cm 1ɸ16mm@10cm
ɵ S calculo S asumidoAs colocado
(mm) ( cm ) ( cm ) ( cm2 )
14mm 6cm 12.5cm 52.308 OK 50.29%
18mm 12cm 12.5cm 20.358 REDISTIBUIR
25mm 34cm 25cm 19.635 OK
16mm 26cm 25cm 8.042 OK
LENO)
ɵ S calculo S asumidoAs colocado
(mm) ( cm ) ( cm ) ( cm2 )
14mm 11cm 10cm 15.394 OK 11.65%
As colocado
( cm2 )
20.106 OK 12.13%
4.51%
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 7.50m
ANCHO TOTAL 4.00m (Ancho de via+Veredas)
FECHA =MARZO 2015
### 0.55m
1ɸ16mm@25cm 1ɸ16mm@2
###
###
###
###
0.550m
1ɸ16mm@20cm
1ɸ14mm@12.5cm
###
0.550m
1ɸ18mm@12.5cm
###
1ɸ14mm@10cm
1ɸ25mm@25cm
1ɸ22mm@10cm
###
1ɸ12mm@15cm 1ɸ16mm@10cm
5.00m