CALCULO DE MUROS DE GRAVEDAD

UBICACION : CIUDADELA LA PLAYA

FECHA: NOVIEMBRE/92

DATOS
qa = 10 t/m2 H = 3.00
fc = 210 Kg/cm2 B = 2.30 2
b = 0.30 Ph = Ka.Pes.H /2 = 2.550
b' = 0.60
Ka = 0.33 Mv = Ph H/3 = 2.550
Pes= 1.70
Peh= 2.20
FSD= 0.60 We/Ph = 2.859
- -------- ---------- - ----------- - ------- ----------- - FSV= Me/Mv = 5.936
| PESO | B.P | MOMENTOS |
| -------- ---------- | ----------- | ------- ----------- | MR = Me - Mv = 12.586
| W1 = 1.980 | 0.400 | 0.792 | X = MR/We = 1.036
| W2 = 1.980 | 0.750 | 1.485 | e = B/2 - X = 0.114
| W3 = 4.620 | 1.367 | 6.314 | B/3= B/3 = 0.767
| W4 = 3.570 | 1.833 | 6.545 | B/6= B/6 = 0.383
| -------- ---------- | ----------- | ------- ----------- |
| We = 12.150 | | Me = 15.136 | Si e<BB/6 q1= We/B (1+6e/B) < qa
- -------- ---------- - ----------- - ------- ----------- - Si e>B/6 q2=2We/(3L(b/2-e))< qa
q = q1 o q2 = 6.855
R esta en el tercio medio central

SE ACEPTA EL CALCULO :

Si FSD >= 1,5


Si FSD >= 1,5
Si qa >= q1 o q2

A = 3.9
CALCULO DE MUROS DE GRAVEDAD
UBICACION : PUENTE SAN MIGUEL
FECHA: MAYO/2012

0.20
α= 0 º

W3

4.00
Ph = Ka.Pes.H2 /2 = 7.897 W4 Relleno
W1
Mv = Ph H/3 = 13.688

/ / / / / W2
FSD= 0.60 We/Ph = 1.567

1.20
FSV= Me/Mv = 2.940
PESO B.P MOMENTOS W5

0.30
W1 = 2.352 1.150 2.705 MR = Me - Mv = 26.555
W2 = 1.764 1.350 2.381 X = MR/We = 1.288
W3 = 1.301 1.450 1.886 e = B/2 - X = 0.237 1.05 0.50 1.50
W4 = 13.010 2.300 29.922 B/3= B/3 = 1.017 51.80 cm
W5 = 2.196 1.525 3.349 B/6= B/6 = 0.508
DATOS:
We = 20.622 Me = 40.243 Si e<BB/6 q1= We/B (1+6e/B) < qa ƴs = 1.77 t/m3
Si e>B/6 q2=2We/(3L(b/2-e))< qa Ka = 0.33
q = q1 o q2 = 9.918 Suelo Tipo II
R esta en el tercio medio central 3.605
qa = 10 T/m2
SE ACEPTA EL CALCULO : f'c = 210 Kg/cm2
fy = 4200 Kg/cm2
Si FSD >=1.50 O.K Pe = 2.40 Kg/cm3
Si FSV >=1.50 O.K
Si qa >= q1 o q2
q1 O.K
q2 O.K
/ / / / / W2

1.20
DIMENSIONES DEL DIENTE NO ES NECESARIO W5

0.30
Kp = 10 Ka 3.300
Pp1= Kp H x Pes 7.009 Asumir este

0.30
Pp2= Kp Hd x Pes 8.762 valor

Pp = (Pp1+Pp2)/2 Hd 2.366 0.10

FSD = 0,60 We /(PH-Pp) 2.237

Si FSD >=1.50 O.K M = Hd2 (Pp1+2 Pp2)/6 =0.368


b = K2 (Mv/B)^0,5 10.00 cm
1.05
/
/

0.30
DISEÑO DEL DEDO /
/
7.745 t/m2
M = L2 (q1+2 q2)/6 = 5.068 t-m / m ### t/m2
Mu = 1,40 M 7.095 t-m / m

As min = 14/fy b d 8.333 cm2 / m As = 0,30 Mu / d 8.514 cm2 / m Poner As calculo

As inferior Seleccionar uno de ellos


ɵ = 12 mm S= 13 cm
ɵ = 14 mm S= 18 cm
ɵ = 16 mm S= 24 cm
Nota: Máximo S de refuerzo = altura efectiva (d 25 cm

### t/m2
1.50
DISEÑO DEL TALON \
\

0.30
\
\

As min = 14/fy b d 8.333 cm2 / m M = q L2 / 2 - L2 (q1+2 q2) / 6 = 4.537 t-m / m


Mu = 1,40 M 6.352 t-m / m ### t/m2
As Superior ### t/m2

As = 0,30 Mu / d 7.623 cm2 / m Poner As min


Seleccionar uno de ellos
ɵ = 12 mm S= 14 cm
ɵ = 14 mm S= 18 cm
ɵ = 16 mm S= 24 cm
DISEÑO DE LA PANTALLA
0.20
H M Mu d As ɵ S
FRANJA As min As a colocar
(m) ( t-m /m ) 1,4 M ( m) cm2/m (mm) ( cm )

1 = H/3
1 1.63 0.4242 0.594 0.25 0.713 8.33 8.33 18 31

1.63
2 3.27 3.3935 4.751 0.35 4.072 11.67 11.67 16 60
3 4.90 11.4531 ### 0.45 10.69 15.00 15.00 16 60

4.00

2 = H/3
1.63
3 = H/3
1.63
1.20
/ / / / / PH = Kh x Pes x h

0.30
1.05 0.50 1.50
CALCULO DE MUROS DE GRAVEDAD
UBICACION : PUENTE SAN MIGUEL
FECHA: MAYO/2012

0.20

0.50
W3

4.00
Agua

Ph = Ka.Pes.H /2 = 7.897
2

4.40

4.40
W1
Mv = Ph H/3 = 13.688

W2
FSD= 0.60 We/Ph = 1.567

1.20
FSV= Me/Mv = 2.940
PESO B.P MOMENTOS W5

0.30
W1 = 2.352 1.150 2.705 MR = Me - Mv = 26.555
W2 = 1.764 1.350 2.381 X = MR/We = 1.288
W3 = 1.301 1.450 1.886 e = B/2 - X = 0.237
W4 = 13.010 2.300 29.922 B/3= B/3 = 1.017 1.05 0.50 1.50
W5 = 2.196 1.525 3.349 B/6= B/6 = 0.508 51.80 cm
DATOS:
We = 20.622 Me = 40.243 Si e<BB/6 q1= We/B (1+6e/B) < qa ƴs = = 1.77 t/m3
Si e>B/6 q2=2We/(3L(b/2-e))< qa Ka = 0.33
q = q1 o q2 = 9.918 Suelo Tipo II
R esta en el tercio medio central 3.605
qa = 10 T/m2
SE ACEPTA EL CALCULO : f'c = 210 Kg/cm2
fy = 4200 Kg/cm2
Si FSD >=1.50 O.K Peh = 2.40 Kg/cm3
Si FSV >=1.50 O.K
Si qa >= q1 o q2
q1 O.K
q2 O.K
/ / / / / W2

1.20
DIMENSIONES DEL DIENTE NO ES NECESARIO W5

0.30
Kp = 10 Ka 3.300
Pp1= Kp H x Pes 7.009
Pp2= Kp Hd x Pes 8.762

Pp = (Pp1+Pp2)/2 Hd 2.366

FSD = 0,60 We /(PH-Pp) 2.237

Si FSD >=1.50 O.K M = Hd2 (Pp1+2 Pp2)/6 =0.368


b = K2 (Mv/B)^0,5 10.00 cm
1.05
/
/

0.30
DISEÑO DEL DEDO /
/
7.745
M = L2 (q1+2 q2)/6 = 5.068 t-m / m ### t/m2
Mu = 1,40 M 7.095 t-m / m

As min = 14/fy b d 8.333 cm2 / m As = 0,30 Mu / d 8.514 cm2 / m Poner As calculo

As inferior Seleccionar uno de ellos


ɵ = 12 mm S= 13 cm
ɵ = 14 mm S= 18 cm
ɵ = 16 mm S= 24 cm
Nota: Máximo S de refuerzo = altura efectiva (d 25 cm

###
1.50
DISEÑO DEL TALON \
\

0.30
\
\

As min = 14/fy b d 8.333 cm2 / m M = q L2 / 2 - L2 (q1+2 q2) / 6 = 4.537 t-m / m


Mu = 1,40 M 6.352 t-m / m ###
As Superior ### t/m2

As = 0,30 Mu / d 7.623 cm2 / m Poner As min


Seleccionar uno de ellos
ɵ = 12 mm S= 14 cm
ɵ = 14 mm S= 18 cm
ɵ = 16 mm S= 24 cm
DISEÑO DE LA PANTALLA
0.20
H M Mu d As ɵ S
FRANJA As min As a colocar
(m) ( t-m /m ) 1,4 M ( m) cm2/m (mm) ( cm )

1 = H/3
1 1.63 0.4242 0.594 0.25 0.713 8.33 8.33 18 31

1.63
2 3.27 3.3935 4.751 0.35 4.072 11.67 11.67 16 60
3 4.90 11.4531 ### 0.45 10.69 15.00 15.00 16 60

4.00

2 = H/3

1.63
3 = H/3

1.63
1.20
/ / / / /

0.30
1.05 0.50 1.50
α=

W4 Relleno

1.50
cm
Asumir este
0.30

valor

t/m2

t/m2
t/m2

PH = Kh x Pes x h

1.50
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD 7.50m No carrilles= 1 U
ANCHO TOTAL 4.00m (Ancho de via+Veredas)
FECHA =ABR 2015

H/24>=0.3m =0.13m 3/8 hv= 0.15m

### 0.55m

hv=1.10(0.15+L/18)= ###
###
###
###
###

###
###

###

###

###

2.45m 0.85m 1.70m


/12=

5.00m

1.50m - ### ### - ### ###


H/2-2H/3 H/8 - H/10 B/3
Dato
Asumir
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 7.50m
ANCHO TOTAL 4.00m (Ancho de via+Veredas)
FECHA =MARZO 2015

DATOS:
ɣhormigón = 2.40 T/m3
ɣm = 1.80 T/m3 ɸ = 30°

a) MUERTA INFRAESTRUCTURA
### 0.55m

###
P5

###
P6
P4
###

P7
###

P8

P3
###

P2
###

P1

A
2.45m 0.85m 1.70m

5.00m
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 7.50m
ANCHO TOTAL 4.00m (Ancho de via+Veredas)
FECHA =MARZO 2015

DATOS:
ɣh.a = 2.40 T/m3
ɣh.s = 2.20 T/m3
N de vig = 2 U

b) CARGA MUERTA SUPER-ESTRUCTURA (D)


Posición para determinar Factor de Rueda

b=6.30m 1.20m 1.80m

0.000m S=7.500m 0.000m


0.700m
0

###
0

0.750m

-0.400m ### ### ### 6.70m ### ### ###

-0.200m 7.100m 7.100m

Ancho del tabl = 7.500m Revisar medidas

Element Superestructura
Volumen WS YA MDSA
Capa de rodadura ### 0.660T/m 0.425m 0.281T-m
Aceras ### 0.870T/m 0.525m 0.457T-m
Tablero (Losa) ### 4.361T/m 0.285m 1.243T-m ### ###
Volados ### -0.442T/m 0.285m -0.126T-m
Vigas ### 0.326T/m 0.085m 0.028T-m
Cartelas ### 0.096T/m 0.137m 0.013T-m
5.872T/m 1.895T-m
Diafragmas Espesor Volumen P
Diafragma de apoyo 0.250m ### 2.85Ton
Diafragma central 0.250m ### -1.96Ton
0.89Ton

D = 3.27Ton
XA = 1.975m
MAD= 6.46T-m

c) CARGA VIVA SUPER-ESTRUCTURA (L)

Cortante: Momento:
Fr= P (1 + (a+b)/= 2.60 P Fr = S/1.80 = 4.17 P

Rd=5.00 T
Rt=7.50 T

Rt=7.50 T

4.00m 4.00m

-0.50m

RL = 78.24Ton
XA = 1.975m
MAL= 154.53T-m

d) FLOTACION (B)

ɣagua = 1.00 T/m3

### 0.55m
###
h' =
###

P5
###

P6
P4
###
###
###
P7

### P8

### P3

###

Nivel aguas freáticas


###
P2

###
P1

A
2.45m 0.85m 1.70m

5.00m

Element Volumen W XA MBA


Cimiento ### 3.000T/m 2.500m 7.500T-m
Sobrecimiento ### 1.320T/m 1.975m 2.607T-m
### 0.124T/m 2.219m 0.275T-m
4.444T/m 10.382T-m

MBA= 10.38T-m

e) VIENTO (W)

e.1) Carga Muerta

Coef. Vie = ### T/m2

Longitud 6.950m
Altura = 0.650m

WD = ###

Viento W YA MWDA
Viga+tablero+acera 0.067T/m 2.817m 0.188T-m
0.188T-m

e.2) Carga Viva


WL = ### YA = 4.830m

MWLA = 5.832T-m

f) FUERZA LONGITUDINAL (LF)

No carril = 1 U
% C. viva= 5%

FL = ### YA = 4.830m

MFLA = -0.063T-m

g) EMPUJE DE TIERRAS (Et)

h' = 0.600m
ɸ = 30° Ka = Tan2 (45-ɸ/2) Kp = 1/Ka
ɣm = 1.80 T/m3 Ka = 0.333 Kp = 3

E = 1/2 ɣs Ka H (H+2 h')= ###

H ( H + 3 h' )
Y = 3 ( H + 2 h' ) = 1.143m

MEtA = 4.320T-m

h) FUERZA DE SISMO (EQ)

h.1) Infraestructura (I)

Datos: Obtenidos de a) Carga Muerta

Carga (P = ###
MYA = ###

EQI = (0.04 - 0.06) P= 0.04 P = ###

Y = MYA / P = 1.29m

MEQIA = 1.134T-m

h.2) Super-estructura (S)

Datos: Obtenidos de b) Carga Muerta Super-estructura

WS = 5.872T/m
MDSA = 1.895T-m
D = ###

Peso de Super-estrcutu 26.16Ton

EQS = (0.04 - 0.06) P= 0.04 P = ###


Y = MYA / P = 0.32m

YS = ( H - hviga) + = 2.92m

MEQSA= 0.765T-m
rminar Factor de Rueda

1.80m ###

0.000m
###
###
###

###
###

###

7.100m

###
PROYECTO: PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES

RESUMEN DE SOLICITACIONES
No TIPO SIMBOLO SENTIDO CARGA SIMBOLO MOMENTO
1 Muerta Superestructura D 3.270Ton MAD 6.458T-m
2 Viva Superestructura L ### MAL ###
3 Flotación B 4.444Ton MBA 10.382T-m
4 Viento D WD 0.067Ton MWDA 0.188T-m
5 Viento L WL 1.208Ton MWLA 5.832T-m
6 Fuerza Longitud. LF ### MFAL -0.063T-m
7 Empuje de tierra Et 3.780Ton MEtA 4.320T-m
8 Sismo Infraestructura EQI 0.881Ton MEQIA 1.134T-m
9 Sismo Superestructura EQS 0.262Ton MEQSA 0.765T-m
10 Muerta Infraestructura P ### MPXA 66.996T-m

ANALISIS DE ESTABILIDAD

FUERZAS RESISTENTES (Ton)


No
COMBINACION D L B WD WL
1 GI: Estribo sin cargas 4.444Ton
2 GI: Estribo con cargas ### ### 4.444Ton
3 GII: Estribo cargado 125% ### 4.444Ton 0.067Ton
4 GIII: Estribo cargado (0.3W ### ### 4.444Ton 0.020Ton 1.208Ton
5 GVII: Estribo cargado 133% ### 4.444Ton

MOMENTOS RESISTENTES (T-M)


No
COMBINACION D L B WD WL
1 GI: Estribo sin cargas ###
2 GI: Estribo con cargas ### ### ###
3 GII: Estribo cargado 125% ### ### 0.188T-m
4 GIII: Estribo cargado (0.3W ### ### ### 0.056T-m 5.832T-m
5 GVII: Estribo cargado 133% ### ###

a entre este rango


No COMBINACION a L/1.5≥ ≥L/3 L Ϭmáx
1 GI: Estribo sin cargas 2.98m OK OK 5.00m 1.51T/m2
2 GI: Estribo con cargas 2.15m OK OK 5.00m 28.08T/m2
3 GII: Estribo cargado 125% 2.81m OK OK 5.00m 2.10T/m2
4 GIII: Estribo cargado (0.3W 2.09m OK OK 5.00m 23.59T/m2
5 GVII: Estribo cargado 133% 2.73m OK OK 5.00m 2.28T/m2

1 GI: (D + L + E + B + SF + CF) 100% L=0, SF=0, CF=0 16.065941


2 GI: (D + L + E + B + SF + CF) 100% SF=0, CF=0
3 GII: (D + E + B + SF + W) 125% SF=0
4 GII: (D + L + E + B + SF + CF + 0.3 SF=0, CF=0
5 GVII: (D + E + B + SF + EQ) 133% SF=0
ON CHILLANES

ZAS RESISTENTES (Ton)


LF Et EQI EQS P nΣF nΣF
3.780Ton 22.022Ton 17.577Ton 3.780Ton
3.780Ton 22.022Ton 99.090Ton 3.780Ton
3.780Ton 22.022Ton 20.847Ton 3.847Ton
-0.013Ton 3.780Ton 22.022Ton 99.090Ton 4.994Ton
3.780Ton ### 0.262Ton 22.022Ton 20.847Ton 4.922Ton

NTOS RESISTENTES (T-M)


LF Et EQI EQS P nΣM nΣM
4.320T-m 66.996T-m 56.61T-m 4.320T-m
4.320T-m 66.996T-m 217.60T-m 4.320T-m
4.320T-m 66.996T-m 63.07T-m 4.508T-m
-0.063T-m 4.320T-m 66.996T-m 217.60T-m 10.146T-m
4.320T-m ### 0.765T-m 66.996T-m 63.07T-m 6.218T-m

CUMPLIMIENTO
Ϭmin FV FD FV FD OBSERVACION
5.52T/m2 13.105 2.325 OK OK Base estribo
11.55T/m2 50.371 13.107 OK OK
4.57T/m2 13.992 2.710 OK OK
8.12T/m2 21.448 9.920 OK OK
3.99T/m2 10.143 2.118 OK OK Base estribo
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 7.50m
ANCHO TOTAL 4.00m (Ancho de via+Veredas)
FECHA =MARZO 2015

DISEÑO DE LA PANTALLA

DATOS:
h' = 0.600m f'c = 280 Kg/cm2 fy = 4200 Kg/cm2
ɸ = 30° Ka = Tan2 (45-ɸ/2) Kp = 1/Ka
ɣm = 1.80 T/m3 Ka = 0.333 Kp = 3
Re = ###
E = 1/2 ɣs Ka H (H+2 h')= ###

H ( H + 3 h' )
Y = 3 ( H + 2 h' ) = 0.933m

### 0.55m

###
h' =
1ɸ16mm@25cm 1ɸ16mm@2

Hv = H viga
###

###
(4)
###

###
###

###

(3)
###

###

0.498m
###

1ɸ14mm@12.5cm
###

(2)
###

0.705m
1ɸ18mm@12.5cm
###

1ɸ14mm@10cm
1ɸ25mm@25cm (1)
###

1ɸ16mm@20cm
###

2.45m 0.85m 1.70m


5.00m

ARMADURA EN LA PANTALLA
H Y M Mu d K As As min
FRANJA ϼ As colocar
(m) (m) ( t-m /m ) 1.60 M ( m) (Kg/cm ) 2
cm2/m
1 2.40m 0.933m 2.419T-m 3.871T-m 0.780m 0.636m 0.0002 1.40cm2 26.00 26.00
2 1.70m 0.68m 1.012T-m 1.618T-m 0.635m 0.401m 0.0001 0.72cm2 21.17 21.17
3 0.70m 0.31m 0.123T-m 0.196T-m 0.428m 0.107m 0.0000 0.13cm2 14.28 14.28
4 0.40m 0.18m 0.035T-m 0.056T-m 0.230m 0.106m 0.0000 0.07cm2 7.67 7.67

ARMADURA DE DISTRIBUCION (LADO SIN RELLENO)


H Y M Mu d K As As min
EJE ϼ norma As colocar
(m) (m) ( t-m /m ) 1.60 M ( m) (Kg/cm2) cm2/m
Lado relleno 0.850m 0.000m 0.0016 13.60cm2 0.00 13.60

ARMADURA DE DISTRIBUCION
H Y M Mu d K As As min
EJE ϼ norma As colocar
(m) (m) ( t-m /m ) 1.60 M ( m) (Kg/cm2) cm2/m
2 lados 0.602m 0.000m 0.0012 10.20cm2 0.00 10.20

DISEÑO DEL DEDO

E = 1/2 ɣs Ka H (H+2 =
h') ###

Para GI: Cargado nΣM = ###


nΣM = 4.320T-m
nΣF = 99.090T-m

Mr = Me - = ###
X = Mr/nΣF = 2.152m
e = B/2 - X = 0.348m
Si e<B/6 q1= nΣF/B (1+6e/B) < = ###
Si e>B/6 q2=2nΣF/(3L(b/2-e))< = ###

1ɸ22mm@10cm
###

2.45m 0.85m 1.70m

5.00m
###

###

###

###
###

###

###

###
=
M = L2 (q1+2 q2)/6 ###

ARMADURA DEL DEDO (CONTACTO CON AGUA)


M Mu d K As As min ɵ S calculo S asumidoAs colocado
ϼ As colocar
( t-m / m ) 1.60 M ( m) (Kg/cm )2
cm2/m (mm) ( cm ) ( cm ) ( cm
### ### 0.530m 21.573m 0.0064 33.90cm2 17.67 33.90 22mm 11cm 10cm 38.013

DISEÑO DEL TALON

4.32T/m2
###

2.45m 0.85m 1.70m


1ɸ16mm@10cm
5.00m
###

###

###

###

M = q L2 / 2 - L2 (q1+2 q2) / 6

ARMADURA DEL TALON (CONTACTO CON RELLENO)


M Mu d K As As min ɵ S calculo S asumidoAs colocado
ϼ As colocar
( t-m / m ) 1.60 M ( m) (Kg/cm )2
cm2/m (mm) ( cm ) ( cm ) ( cm
### ### 0.530m -16.979m -0.0046 ### 17.67 17.67 16mm 11cm 10cm 20.106
ARMADURA DE DISTRIBUCION

d K As As min ɵ S calculo S asumidoAs colocado


ϼ norma As colocar
( m) (Kg/cm )
2
cm2/m (mm) ( cm ) ( cm ) ( cm2 )
0.600m 0.000m 0.0012 7.20cm2 7.20 12mm 16cm 15cm 7.540 OK

1ɸ22mm@10cm

1ɸ12mm@15cm 1ɸ16mm@10cm
ɵ S calculo S asumidoAs colocado
(mm) ( cm ) ( cm ) ( cm2 )
14mm 6cm 12.5cm 52.308 OK 50.29%
18mm 12cm 12.5cm 20.358 REDISTIBUIR
25mm 34cm 25cm 19.635 OK
16mm 26cm 25cm 8.042 OK

LENO)
ɵ S calculo S asumidoAs colocado
(mm) ( cm ) ( cm ) ( cm2 )
14mm 11cm 10cm 15.394 OK 11.65%

ɵ S calculo S asumidoAs colocado


(mm) ( cm ) ( cm ) ( cm2 )
16mm 20cm 20cm 10.053 REDISTIBUIR -1.46%
As colocado
( cm2 )
38.013 OK 10.81%

As colocado
( cm2 )
20.106 OK 12.13%
4.51%
PROYECTO:PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 7.50m
ANCHO TOTAL 4.00m (Ancho de via+Veredas)
FECHA =MARZO 2015

ARMADO DEL ESTRIBO

### 0.55m

1ɸ16mm@25cm 1ɸ16mm@2

###
###
###
###

0.550m
1ɸ16mm@20cm
1ɸ14mm@12.5cm
###

0.550m
1ɸ18mm@12.5cm
###

1ɸ14mm@10cm
1ɸ25mm@25cm

1ɸ22mm@10cm
###

1ɸ12mm@15cm 1ɸ16mm@10cm

2.45m 0.85m 1.70m

5.00m