Documentos de Académico
Documentos de Profesional
Documentos de Cultura
PARCIAL
1.59
0.09
0.87
0.63
2.60
0.66
0.20
1.66
0.08
1.03
0.39
0.64
UIPO
S/. 19.11
PARCIAL
6.36
0.21
1.94
4.21
12.75
12.43
0.32
S/. 4.13
PARCIAL
1.59
0.09
0.87
0.63
2.54
2.46
0.08
S/. 90.52
PARCIAL
2.49
0.06
1.17
1.26
9.43
0.82
4.63
3.91
0.07
78.60
78.60
S/. 41.75
PARCIAL
4.46
0.19
1.75
2.52
37.29
13.88
23.28
0.13
S/. 23.74
PARCIAL
22.61
1.57
21.04
1.13
1.13
ILIZANTE
S/. 519.60
PARCIAL
90.93
1.57
14.57
11.67
63.12
16.78
3.63
8.60
4.55
411.89
30.25
35.10
339.25
3.22
4.07
L
S/. 58.72
PARCIAL
32.00
1.89
17.49
12.62
1.60
1.60
25.12
0.95
1.40
1.16
21.62
S/. 5.10
PARCIAL
1.14
0.07
0.62
0.45
0.03
0.03
3.93
0.09
3.83
RICO
S/. 38.43
PARCIAL
6.70
0.19
5.25
1.26
0.20
0.20
31.53
1.73
28.68
1.12
DE CANAL
S/. 8.85
PARCIAL
8.43
0.38
5.25
2.80
0.42
0.42
CANAL
S/. 6.74
PARCIAL
2.58
0.13
0.58
1.87
0.13
0.13
4.03
4.03
PARTIDA TRAZO, NIVEL Y REPLANTEO
RENDIMIENTO 250.00 m2/día
JORNADA 8.00 horas
CODIGO DESCRIPCION UNIDAD CUADRILLA CANTIDAD
MO MANO DE OBRA
MO004 Capataz hh 0.10 0.0032
Topografo hh 1.00 0.0320
Peon hh 1.00 0.0320
EH EQUIPO Y HERRAMIENTAS
Nivel topografico hm 1.00 0.0320
Mira topografica hm 1.00 0.0320
Teodolito hm 1.00 0.0320
EH001 Herramientas manuales %mo 5.00%
MA MATERIAL
cal x 20kg kg 0.0300
madera tornillo p2 0.1400
PRECIO PARCIAL
1.28
23.57 0.08 7648.2 S/ 33,589.06
21.86 0.70
15.78 0.50
2.08
16.61 0.53
4.98 0.16
41.45 1.33
1.28 0.06
1.03
13.14 0.39
4.55 0.64
PRECIO PARCIAL
6.36
23.57 0.21
21.86 1.94
15.78 4.21
12.75
139.88 12.43
6.36 0.32
N DE TERRENO 85285.0782
COSTO S/. 4.13
PRECIO PARCIAL
1.59
23.57 0.09
21.86 0.87
15.78 0.63
2.54
30.79 2.46
1.59 0.08
CEDENTE S/ 159,656.18
COSTO S/. 41.75
PRECIO PARCIAL
4.46
23.57 0.19
21.86 1.75
15.78 2.52
37.29
173.45 13.88
290.94 23.28
4.46 0.13
N IMPERMEABILIZANTE
COSTO S/. 519.60
PRECIO PARCIAL
90.93
23.57 1.57
21.86 14.57
17.51 11.67
15.78 63.12
16.78
5.45 3.63
12.90 8.60
90.93 4.55
411.89
55.00 30.25
65.00 35.10
29.50 339.25
12.87 3.22
67.80 4.07
O PARA CANAL
COSTO S/. 58.72
PRECIO PARCIAL
32.00
23.57 1.89
21.86 17.49
15.78 12.62
1.60
32.00 1.60
25.12
3.15 0.95
4.50 1.40
38.64 1.16
5.10 21.62
0KG/CM2
COSTO S/. 5.10
PRECIO PARCIAL
1.14
23.57 0.07
21.86 0.62
15.78 0.45
0.03
1.14 0.03
3.93
3.15 0.09
3.65 3.83
DO ELASTOMERICO
COSTO S/. 38.43
PRECIO PARCIAL
6.70
23.57 0.19
21.86 5.25
15.78 1.26
0.20
6.70 0.20
31.53
525.04 1.73
95.00 28.68
7.63 1.12
E CONCRETO DE CANAL
COSTO S/. 8.85
PRECIO PARCIAL
8.43
23.57 0.38
21.86 5.25
17.51 2.80
0.42
8.43 0.42
CONCRETO EN CANAL
COSTO S/. 6.74
PRECIO PARCIAL
2.58
23.57 0.13
21.86 0.58
17.51 1.87
0.13
2.58 0.13
4.03
80.50 4.03
S/ 351,608.86 costo de excavacion
0.03