Está en la página 1de 87

MEMORIA DE CALCULO CONCRETO ARMADO

CIM
PROYECTO CONSTRUCCIÓN DE CENTRO COMERCIAL 5 NIVELES
UBICACIÓN ORCOTUNA - HUANCAYO

ZAPATA AISLADA 60x60

DATOS COLUMNA PROPIEDADES DEL SUELO

B 0.50 m Eje "X" q= 25.0 Ton*m2


H 0.30 m Eje "Y" %Pz 1.07 % Peso de zap.

CARGAS LONGITUDINAL CARGAS TRANSVERSAL


Pm = 56.60 Ton Pm = -
Pv = 14.55 Ton Pv = -
Mm = 0.00 Ton*m Mm = 0.00 Ton*m
Mv = 0.00 Ton*m Mv = 0.00 Ton*m
Ps = 0.96 Ton Ps = 1.30 Ton
Ms = 8.56 Ton*m Ms = 0.17 Ton*m

PREDIMENCIONAMIENTO
B= 1.70 m Eje"y" 𝑉𝑢𝑝=𝜎∗(𝐴
𝐴=(𝑃𝑡∗%𝑃𝑧)/(𝑞−3)
A= 3.46 m2 L= 1.90 m Eje"x"
At = 3.23 m2 > 3.46 m2 No Cumple
𝜎=(𝑃𝑡∗%𝑃𝑧)/𝐴±6𝑀𝑙/(𝐿^2∗𝐵)
VERIFICACIONES ±6𝑀𝑡/(𝐵^2∗𝐿)

A. LONGITUDINAL Carga por Gravedad ESFUERZO ULTIMO


σ1 = 23.57 < 25.0 Ton*m2 Cumple σu (Gravedad)= 36.53 Ton/m2
σ2 = 23.57 < 25.0 Ton*m2 Cumple σu (Sismo)= 40.32 Ton/m2

B. TRANVERSAL Carga por Gravedad DISEÑO CORTE "X"


σ1 = 23.57 < 25.0 Ton*m2 Cumple H= 0.50 m
σ2 = 23.57 < 25.0 Ton*m2 Cumple D= 0.40 m
x
C. BIAXIAL Carga por Gravedad 𝑑
σ1 = 23.57 < 25.0 Ton*m2 Cumple
1.7

σ2 = 23.57 < 25.0 Ton*m2 Cumple


σ3 = 23.57 < 25.0 Ton*m2 Cumple
σ4 = 23.57 < 25.0 Ton*m2 Cumple
1.9
D. LONGITUDINAL Carga por Sismo
σ1 = 32.26 < 32.5 Ton*m2 Cumple x= 0.30 m 𝑉𝑢=𝜎∗𝐵∗𝑋
𝑉𝑢=𝜎∗𝐵∗𝑋
σ2 = 15.52 < 32.5 Ton*m2 Cumple ᴓVc 44.39 Ton
Vu= 20.56 Ton <
E. TRANVERSAL Carga por Sismo
σ1 = 22.95 < 32.5 Ton*m2 Cumple DISEÑO CORTE "y"
σ2 = 23.32 < 32.5 Ton*m2 Cumple

F. BIAXIAL Carga por Sismo LONGITUDINAL

1.9
σ1 = 14.88 < 32.5 Ton*m2 Cumple
σ2 = 31.62 < 32.5 Ton*m2 Cumple
σ3 = 14.88 < 32.5 Ton*m2 Cumple
σ4 = 31.62 < 32.5 Ton*m2 Cumple 1.7

G. BIAXIAL Carga por Sismo TRANVERS x= 0.30 m


σ1 = 24.19 < 14.3*1.3 32.5 Tn-m2
ok ᴓVc 49.62 Ton
σ2 = 24.19 < 14.3*1.3 32.5 Tn-m2 ok Vu= 22.98 Ton <
σ3 = 23.81 < 14.3*1.3 32.5 Tn-m2 ok
σ4 = 23.81 < 14.3*1.3 32.5 Tn-m2 ok
O ARMADO DISEÑO POR PUNZONAMIENTO "X"
CIMENTACIONES
5 NIVELES H= 0.50 m
10/2/2021
D= 0.40 m

1.7
a

Fc 210 Kg/cm2
Fy 4200 kg/cm2 1.9
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑

Bc 1.66666666666667
d/2 = 0.20 m
a= 0.90 m
b= 0.70 m
Bo = 3.20 m

| ØVcp (1) = 187.62 Ton


ØVcp (2) = 173.43 Ton norma < NO
ØVc (max) = 173.43 Ton
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜) Vup = 104.83 Ton < 173.43 Ton
Cumple
No Cumple DISEÑO POR PUNZONAMIENTO

b
1.9

6.53 Ton/m2
0.32 Ton/m2 a

1.7
Bc 1.66666666666667
d/2 0.2

a 0.7
b 0.9
Bo 3.2
Vcp= 220.73
Vcp= 204.04 norma < NO
Vcp=
ᴓ= 0.85 ᴓVcp 173.43
𝑉𝑢=𝜎∗𝐵∗𝑋 Vup 104.834 < 173.43 OK
𝑉𝑢=𝜎∗𝐵∗𝑋
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑
44.39 Ton
Cumple
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜)

ᴓ 5/8" @15cm

1.4 m
ᴓ 5/8" @15m
49.62 Ton
Cumple
1.4 m 1.4 m
DISEÑO POR FLEXION "X" ACERO EN LA DIRECCION LONGITUDNAL
Rec
S=
T=

1.7
S
*Supongamos Acero
1.9 Diam
B= 100 cm Ab=
T
Nro Varillas=
x= 0.70 m
Mu = 16.79 Ton*m ESP=
w= 0.0575197264237479
Cuantilla = 0.0028759863211874
Asreq = 11.50 cm2
As min 7.20 cm2 ACERO EN LA DIRECCION TRANSVERSAL
r=
1" 2 varillas Ast=
3/4" 4 varillas S=
5/8" 6 varillas T=
S *Supongamos Acero
s 1" 85.0 30 Diam
s 3/4" 43.0 30 Ab=
s 5/8" 28.0 15 T Nro Varillas=

S=
s 15

DISEÑO POR FLEXION "Y"


1.9

0
1.7

X 0.7
Mu 18.77
Ku 0.00
Þ 0.0005
Þ 0.0018
As 3420.00 cm2
As min 4560.00 cm2

1" 894 varillas


3/4" 1606 varillas
5/8" 2400 varillas

s 1" 0.0 0
s 3/4" 0.0 0
s 5/8" 0.0 15

s 15
50 cm

1.4 m
ᴓ 5/8" @15 cm
BARRA db(cm) Ab(cm2)
7.5 cm 8 mm 0.8 0.5
1.7 m 3/8" 0.95 0.71
1.9 m 1/2" 1.27 1.29
5/8" 1.59 2
Supongamos Acero 5/8" 3/4" 1.91 2.84
1.59 cm 7/8" 2.22 3.87
2 cm2 1" 2.54 5.1
𝐸𝑆𝑃=(𝑆−2∗𝑟−𝜑𝑏)/(𝑛−1)
5.7520 1 3/8" 3.58 10.06
6
30.682
30 COLOCAR 6 ф 5/8" @ 30

7.5 cm 𝐴𝑠𝑡=𝑇/𝑆∗𝐴𝑠𝑢𝑠𝑎𝑟
12.857350612 cm2
1.7
1.9
Supongamos Acero 3/4"
1.91 cm
2.84 cm2 𝑆=(𝐵−2∗𝑟−𝜑𝑏)/(𝑛−1)

4.5272361311
4.5
49.454285714
50 COLOCAR 4.5 ф 3/4" @ 50
MEMORIA DE CALCULO CONCRETO ARMADO
CIM
PROYECTO CONSTRUCCIÓN DE CENTRO COMERCIAL 5 NIVELES
UBICACIÓN ORCOTUNA - HUANCAYO

ZAPATA AISLADA 60x60

DATOS COLUMNA PROPIEDADES DEL SUELO

B 0.25 m Eje "X" q= 25.0 Ton*m2


H 0.40 m Eje "Y" %Pz 1.07 % Peso de zap.

CARGAS LONGITUDINAL CARGAS TRANSVERSAL


Pm = 37.31 Ton Pm = -
Pv = 8.19 Ton Pv = -
Mm = 0.00 Ton*m Mm = 0.00 Ton*m
Mv = 0.00 Ton*m Mv = 0.00 Ton*m
Ps = 1.37 Ton Ps = 0.86 Ton
Ms = 1.97 Ton*m Ms = 0.20 Ton*m

PREDIMENCIONAMIENTO
B= 1.65 m Eje"y" 𝑉𝑢𝑝=𝜎∗(𝐴
𝐴=(𝑃𝑡∗%𝑃𝑧)/(𝑞−3)
A= 2.21 m2 L= 1.50 m Eje"x"
At = 2.48 m2 > 2.21 m2 Cumple
𝜎=(𝑃𝑡∗%𝑃𝑧)/𝐴±6𝑀𝑙/(𝐿^2∗𝐵)
VERIFICACIONES ±6𝑀𝑡/(𝐵^2∗𝐿)

A. LONGITUDINAL Carga por Gravedad ESFUERZO ULTIMO


σ1 = 19.67 < 25.0 Ton*m2 Cumple σu (Gravedad)= 30.49 Ton/m2
σ2 = 19.67 < 25.0 Ton*m2 Cumple σu (Sismo)= 29.31 Ton/m2

B. TRANVERSAL Carga por Gravedad DISEÑO CORTE "X"


σ1 = 19.67 < 25.0 Ton*m2 Cumple H= 0.50 m
σ2 = 19.67 < 25.0 Ton*m2 Cumple D= 0.40 m
x
C. BIAXIAL Carga por Gravedad 𝑑
σ1 = 19.67 < 25.0 Ton*m2 Cumple
1.65

σ2 = 19.67 < 25.0 Ton*m2 Cumple


σ3 = 19.67 < 25.0 Ton*m2 Cumple
σ4 = 19.67 < 25.0 Ton*m2 Cumple
1.5
D. LONGITUDINAL Carga por Sismo
σ1 = 23.45 < 32.5 Ton*m2 Cumple x= 0.23 m 𝑉𝑢=𝜎∗𝐵∗𝑋
𝑉𝑢=𝜎∗𝐵∗𝑋
σ2 = 17.08 < 32.5 Ton*m2 Cumple ᴓVc 43.09 Ton
Vu= 11.32 Ton <
E. TRANVERSAL Carga por Sismo
σ1 = 19.01 < 32.5 Ton*m2 Cumple DISEÑO CORTE "y"
σ2 = 19.59 < 32.5 Ton*m2 Cumple

F. BIAXIAL Carga por Sismo LONGITUDINAL

1.5
σ1 = 15.89 < 32.5 Ton*m2 Cumple
σ2 = 22.26 < 32.5 Ton*m2 Cumple
σ3 = 15.89 < 32.5 Ton*m2 Cumple
σ4 = 22.26 < 32.5 Ton*m2 Cumple 1.65

G. BIAXIAL Carga por Sismo TRANVERS x= 0.23 m


σ1 = 20.34 < 14.3*1.3 32.5 Tn-m2
ok ᴓVc 39.17 Ton
σ2 = 20.34 < 14.3*1.3 32.5 Tn-m2 ok Vu= 10.29 Ton <
σ3 = 19.75 < 14.3*1.3 32.5 Tn-m2 ok
σ4 = 19.75 < 14.3*1.3 32.5 Tn-m2 ok
O ARMADO DISEÑO POR PUNZONAMIENTO "X"
CIMENTACIONES
5 NIVELES H= 0.50 m
10/2/2021
D= 0.40 m

1.65
a

Fc 210 Kg/cm2
Fy 4200 kg/cm2 1.5
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑

Bc 0.625
d/2 = 0.20 m
a= 0.65 m
b= 0.80 m
Bo = 2.90 m

| ØVcp (1) = 327.21 Ton


ØVcp (2) = 157.17 Ton norma < NO
ØVc (max) = 157.17 Ton
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜) Vup = 59.61 Ton < 157.17 Ton
Cumple
Cumple DISEÑO POR PUNZONAMIENTO

b
1.5

0.49 Ton/m2
9.31 Ton/m2 a

1.65
Bc 0.625
d/2 0.2

a 0.8
b 0.65
Bo 2.9
Vcp= 384.95
Vcp= 184.91 norma < NO
Vcp=
ᴓ= 0.85 ᴓVcp 157.17
𝑉𝑢=𝜎∗𝐵∗𝑋 Vup 59.607 < 157.17 OK
𝑉𝑢=𝜎∗𝐵∗𝑋
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑
43.09 Ton
Cumple
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜)

ᴓ 5/8" @15cm

1.4 m
ᴓ 5/8" @15m
39.17 Ton
Cumple
1.4 m 1.4 m
DISEÑO POR FLEXION "X" ACERO EN LA DIRECCION LONGITUDNAL
Rec
S=
T=

1.65
S
*Supongamos Acero
1.5 Diam
B= 100 cm Ab=
T
Nro Varillas=
x= 0.63 m
Mu = 9.83 Ton*m ESP=
w= 0.0331750532462324
Cuantilla = 0.00165875266231162
Asreq = 6.64 cm2
As min 7.20 cm2 ACERO EN LA DIRECCION TRANSVERSAL
r=
1" 1 varillas Ast=
3/4" 3 varillas S=
5/8" 4 varillas T=
S *Supongamos Acero
s 1" 165.0 30 Diam
s 3/4" 55.0 30 Ab=
s 5/8" 41.0 15 T Nro Varillas=

S=
s 15

DISEÑO POR FLEXION "Y"


1.5

0
1.65

X 0.625
Mu 8.93
Ku 0.00
Þ 0.0005
Þ 0.0018
As 2700.00 cm2
As min 3600.00 cm2

1" 706 varillas


3/4" 1268 varillas
5/8" 1895 varillas

s 1" 0.0 0
s 3/4" 0.0 0
s 5/8" 0.0 15

s 15
50 cm

1.4 m
ᴓ 5/8" @15 cm
BARRA db(cm) Ab(cm2)
7.5 cm 8 mm 0.8 0.5
1.65 m 3/8" 0.95 0.71
1.5 m 1/2" 1.27 1.29
5/8" 1.59 2
Supongamos Acero 5/8" 3/4" 1.91 2.84
1.59 cm 7/8" 2.22 3.87
2 cm2 1" 2.54 5.1
𝐸𝑆𝑃=(𝑆−2∗𝑟−𝜑𝑏)/(𝑛−1)
3.6000 1 3/8" 3.58 10.06
3.5
59.364
60 COLOCAR 3.5 ф 5/8" @ 60

7.5 cm 𝐴𝑠𝑡=𝑇/𝑆∗𝐴𝑠𝑢𝑠𝑎𝑟
6.5454545455 cm2
1.65
1.5
Supongamos Acero 3/4"
1.91 cm
2.84 cm2 𝑆=(𝐵−2∗𝑟−𝜑𝑏)/(𝑛−1)

2.304737516
2.5
88.726666667
90 COLOCAR 2.5 ф 3/4" @ 90
MEMORIA DE CALCULO CONCRETO ARMADO
CIM
PROYECTO CONSTRUCCIÓN DE CENTRO COMERCIAL 5 NIVELES
UBICACIÓN ORCOTUNA - HUANCAYO

ZAPATA AISLADA 50x30

DATOS COLUMNA PROPIEDADES DEL SUELO

B 0.50 m Eje "X" q= 25.0 Ton*m2


H 0.30 m Eje "Y" %Pz 1.07 % Peso de zap.

CARGAS LONGITUDINAL CARGAS TRANSVERSAL


Pm = 25.61 Ton Pm = -
Pv = 5.26 Ton Pv = -
Mm = 0.00 Ton*m Mm = 0.00 Ton*m
Mv = 0.00 Ton*m Mv = 0.00 Ton*m
Ps = 14.21 Ton Ps = 2.25 Ton
Ms = 6.77 Ton*m Ms = 0.17 Ton*m

PREDIMENCIONAMIENTO
B= 1.30 m Eje"y" 𝑉𝑢𝑝=𝜎∗(𝐴
𝐴=(𝑃𝑡∗%𝑃𝑧)/(𝑞−3)
A= 1.50 m2 L= 1.50 m Eje"x"
At = 1.95 m2 > 1.50 m2 Cumple
𝜎=(𝑃𝑡∗%𝑃𝑧)/𝐴±6𝑀𝑙/(𝐿^2∗𝐵)
VERIFICACIONES ±6𝑀𝑡/(𝐵^2∗𝐿)

A. LONGITUDINAL Carga por Gravedad ESFUERZO ULTIMO


σ1 = 16.94 < 25.0 Ton*m2 Cumple σu (Gravedad)= 26.26 Ton/m2
σ2 = 16.94 < 25.0 Ton*m2 Cumple σu (Sismo)= 48.28 Ton/m2

B. TRANVERSAL Carga por Gravedad DISEÑO CORTE "X"


σ1 = 16.94 < 25.0 Ton*m2 Cumple H= 0.50 m
σ2 = 16.94 < 25.0 Ton*m2 Cumple D= 0.40 m
x
C. BIAXIAL Carga por Gravedad 𝑑
σ1 = 16.94 < 25.0 Ton*m2 Cumple
1.3

σ2 = 16.94 < 25.0 Ton*m2 Cumple


σ3 = 16.94 < 25.0 Ton*m2 Cumple
σ4 = 16.94 < 25.0 Ton*m2 Cumple
1.5
D. LONGITUDINAL Carga por Sismo
σ1 = 38.62 < 32.5 Ton*m2 no Cumple x= 0.10 m 𝑉𝑢=𝜎∗𝐵∗𝑋
𝑉𝑢=𝜎∗𝐵∗𝑋
σ2 = 10.85 < 32.5 Ton*m2 Cumple ᴓVc 33.95 Ton
Vu= 6.28 Ton <
E. TRANVERSAL Carga por Sismo
σ1 = 15.30 < 32.5 Ton*m2 Cumple DISEÑO CORTE "y"
σ2 = 16.11 < 32.5 Ton*m2 Cumple

F. BIAXIAL Carga por Sismo LONGITUDINAL

1.5
σ1 = -4.75 < 32.5 Ton*m2 Cumple
σ2 = 23.03 < 32.5 Ton*m2 Cumple
σ3 = -4.75 < 32.5 Ton*m2 Cumple
σ4 = 23.03 < 32.5 Ton*m2 Cumple 1.3

G. BIAXIAL Carga por Sismo TRANVERS x= 0.10 m


σ1 = 18.58 < 14.3*1.3 32.5 Tn-m2
ok ᴓVc 39.17 Ton
σ2 = 18.58 < 14.3*1.3 32.5 Tn-m2 ok Vu= 7.24 Ton <
σ3 = 17.77 < 14.3*1.3 32.5 Tn-m2 ok
σ4 = 17.77 < 14.3*1.3 32.5 Tn-m2 ok
O ARMADO DISEÑO POR PUNZONAMIENTO "X"
CIMENTACIONES
5 NIVELES H= 0.50 m
10/2/2021
D= 0.40 m

1.3
a

Fc 210 Kg/cm2
Fy 4200 kg/cm2 1.5
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑

Bc 1.66666666666667
d/2 = 0.20 m
a= 0.90 m
b= 0.70 m
Bo = 3.20 m

| ØVcp (1) = 187.62 Ton


ØVcp (2) = 173.43 Ton norma < NO
ØVc (max) = 173.43 Ton
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜) Vup = 63.73 Ton < 173.43 Ton
Cumple
Cumple DISEÑO POR PUNZONAMIENTO

b
1.5

6.26 Ton/m2
8.28 Ton/m2 a

1.3
Bc 1.66666666666667
d/2 0.2

a 0.7
b 0.9
Bo 3.2
Vcp= 220.73
Vcp= 204.04 norma < NO
Vcp=
ᴓ= 0.85 ᴓVcp 173.43
𝑉𝑢=𝜎∗𝐵∗𝑋 Vup 63.729 < 173.43 OK
𝑉𝑢=𝜎∗𝐵∗𝑋
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑
33.95 Ton
Cumple
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜)

ᴓ 5/8" @15cm

1.4 m
ᴓ 5/8" @15m
39.17 Ton
Cumple
1.4 m 1.4 m
DISEÑO POR FLEXION "X" ACERO EN LA DIRECCION LONGITUDNAL
Rec
S=
T=

1.3
S
*Supongamos Acero
1.5 Diam
B= 100 cm Ab=
T
Nro Varillas=
x= 0.50 m
Mu = 7.85 Ton*m ESP=
w= 0.0263876886641019
Cuantilla = 0.0013193844332051
Asreq = 5.28 cm2
As min 7.20 cm2 ACERO EN LA DIRECCION TRANSVERSAL
r=
1" 1 varillas Ast=
3/4" 3 varillas S=
5/8" 4 varillas T=
S *Supongamos Acero
s 1" 130.0 30 Diam
s 3/4" 43.0 30 Ab=
s 5/8" 33.0 15 T Nro Varillas=

S=
s 15

DISEÑO POR FLEXION "Y"


1.5

0
1.3

X 0.5
Mu 9.05
Ku 0.00
Þ 0.0005
Þ 0.0018
As 2700.00 cm2
As min 3600.00 cm2

1" 706 varillas


3/4" 1268 varillas
5/8" 1895 varillas

s 1" 0.0 0
s 3/4" 0.0 0
s 5/8" 0.0 15

s 15
50 cm

1.4 m
ᴓ 5/8" @15 cm
BARRA db(cm) Ab(cm2)
7.5 cm 8 mm 0.8 0.5
1.3 m 3/8" 0.95 0.71
1.5 m 1/2" 1.27 1.29
5/8" 1.59 2
Supongamos Acero 5/8" 3/4" 1.91 2.84
1.59 cm 7/8" 2.22 3.87
2 cm2 1" 2.54 5.1
𝐸𝑆𝑃=(𝑆−2∗𝑟−𝜑𝑏)/(𝑛−1)
3.6000 1 3/8" 3.58 10.06
3.5
45.364
45 COLOCAR 3.5 ф 5/8" @ 45

7.5 cm 𝐴𝑠𝑡=𝑇/𝑆∗𝐴𝑠𝑢𝑠𝑎𝑟
8.3076923077 cm2
1.3
1.5
Supongamos Acero 3/4"
1.91 cm
2.84 cm2 𝑆=(𝐵−2∗𝑟−𝜑𝑏)/(𝑛−1)

2.9252437703
3
66.545
65 COLOCAR 3 ф 3/4" @ 65
MEMORIA DE CALCULO CONCRETO ARMADO
CIM
PROYECTO CONSTRUCCIÓN DE VIVIENDA DE 2 PISOS + AZOTEA
UBICACIÓN JUNIN - HUANCAYO - HUANCAYO

ZAPATA AISLADA .40x.30

DATOS COLUMNA PROPIEDADES DEL SUELO

B 0.50 m Eje "X" q= 25.0 Ton*m2


H 0.30 m Eje "Y" %Pz 1.07 % Peso de zap.

CARGAS LONGITUDINAL CARGAS TRANSVERSAL


Pm = 37.31 Ton Pm = -
Pv = 8.19 Ton Pv = -
Mm = 0.00 Ton*m Mm = 0.00 Ton*m
Mv = 0.00 Ton*m Mv = 0.00 Ton*m
Ps = 1.37 Ton Ps = 0.86 Ton
Ms = 1.98 Ton*m Ms = 0.21 Ton*m

PREDIMENCIONAMIENTO
B= 1.40 m Eje"y" 𝑉𝑢𝑝=𝜎∗(𝐴
𝐴=(𝑃𝑡∗%𝑃𝑧)/(𝑞−3)
A= 2.21 m2 L= 1.60 m Eje"x"
At = 2.24 m2 > 2.21 m2 Cumple
𝜎=(𝑃𝑡∗%𝑃𝑧)/𝐴±6𝑀𝑙/(𝐿^2∗𝐵)
VERIFICACIONES ±6𝑀𝑡/(𝐵^2∗𝐿)

A. LONGITUDINAL Carga por Gravedad ESFUERZO ULTIMO


σ1 = 21.73 < 25.0 Ton*m2 Cumple σu (Gravedad)= 33.69 Ton/m2
σ2 = 21.73 < 25.0 Ton*m2 Cumple σu (Sismo)= 32.13 Ton/m2

B. TRANVERSAL Carga por Gravedad DISEÑO CORTE "X"


σ1 = 21.73 < 25.0 Ton*m2 Cumple H= 0.50 m
σ2 = 21.73 < 25.0 Ton*m2 Cumple D= 0.40 m
x
C. BIAXIAL Carga por Gravedad 𝑑
σ1 = 21.73 < 25.0 Ton*m2 Cumple
1.4

σ2 = 21.73 < 25.0 Ton*m2 Cumple


σ3 = 21.73 < 25.0 Ton*m2 Cumple
σ4 = 21.73 < 25.0 Ton*m2 Cumple
1.6
D. LONGITUDINAL Carga por Sismo
σ1 = 25.70 < 32.5 Ton*m2 Cumple x= 0.70 m 𝑉𝑢=𝜎∗𝐵∗𝑋
𝑉𝑢=𝜎∗𝐵∗𝑋
σ2 = 19.07 < 32.5 Ton*m2 Cumple ᴓVc 36.56 Ton
Vu= 33.01 Ton <
E. TRANVERSAL Carga por Sismo
σ1 = 20.92 < 32.5 Ton*m2 Cumple DISEÑO CORTE "y"
σ2 = 21.73 < 32.5 Ton*m2 Cumple

F. BIAXIAL Carga por Sismo LONGITUDINAL

1.6
σ1 = 17.77 < 32.5 Ton*m2 Cumple
σ2 = 24.39 < 32.5 Ton*m2 Cumple
σ3 = 17.77 < 32.5 Ton*m2 Cumple
σ4 = 24.39 < 32.5 Ton*m2 Cumple 1.4

G. BIAXIAL Carga por Sismo TRANVERS x= 0.70 m


σ1 = 22.55 < 14.3*1.3 32.5 Tn-m2
ok ᴓVc 41.78 Ton
σ2 = 22.55 < 14.3*1.3 32.5 Tn-m2 ok Vu= 37.73 Ton <
σ3 = 21.74 < 14.3*1.3 32.5 Tn-m2 ok
σ4 = 21.74 < 14.3*1.3 32.5 Tn-m2 ok
O ARMADO DISEÑO POR PUNZONAMIENTO "X"
CIMENTACIONES
+ AZOTEA H= 0.50 m
5/30/2021
O D= 0.40 m

1.4
a

Fc 210 Kg/cm2
Fy 4200 kg/cm2 1.6
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑

Bc 1.66666666666667
d/2 = 0.20 m
a= 0.70 m
b= 0.70 m
Bo = 2.10 m

| ØVcp (1) = 123.13 Ton


ØVcp (2) = 113.82 Ton norma < NO
ØVc (max) = 113.82 Ton
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜) Vup = 58.95 Ton < 113.82 Ton
Cumple
Cumple DISEÑO POR PUNZONAMIENTO

b
1.6

3.69 Ton/m2
2.13 Ton/m2 a

1.4
Bc 1.66666666666667
d/2 0.2

a 0.7
b 0.9
Bo 3.2
Vcp= 220.73
Vcp= 204.04 norma < NO
Vcp=
ᴓ= 0.85 ᴓVcp 173.43
𝑉𝑢=𝜎∗𝐵∗𝑋 Vup 54.238 < 173.43 OK
𝑉𝑢=𝜎∗𝐵∗𝑋
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑
36.56 Ton
Cumple
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜)

ᴓ 5/8" @15cm

1.4 m
ᴓ 5/8" @15m
41.78 Ton
Cumple
1.4 m 1.4 m
DISEÑO POR FLEXION "X" ACERO EN LA DIRECCION LONGITUDNAL
Rec
S=
T=

1.4
S
*Supongamos Acero
1.6 Diam
B= 100 cm Ab=
T
Nro Varillas=
x= 1.10 m
Mu = 28.53 Ton*m ESP=
w= 0.100330310236256
Cuantilla = 0.00501651551181281
Asreq = 20.07 cm2
As min 7.20 cm2 ACERO EN LA DIRECCION TRANSVERSAL
r=
1" 4 varillas Ast=
3/4" 7 varillas S=
5/8" 11 varillas T=
S *Supongamos Acero
s 1" 35.0 30 Diam
s 3/4" 20.0 20 Ab=
s 5/8" 13.0 15 T Nro Varillas=

S=
s 15

DISEÑO POR FLEXION "Y"


1.6

0
1.4

X 0.55
Mu 8.15
Ku 0.00
Þ 0.0005
Þ 0.0018
As 2880.00 cm2
As min 3840.00 cm2

1" 753 varillas


3/4" 1352 varillas
5/8" 2021 varillas

s 1" 0.0 0
s 3/4" 0.0 0
s 5/8" 0.0 15

s 15
50 cm

1.4 m
ᴓ 5/8" @15 cm
BARRA db(cm) Ab(cm2)
7.5 cm 8 mm 0.8 0.5
1.4 m 3/8" 0.95 0.71
1.6 m 1/2" 1.27 1.29
5/8" 1.59 2
Supongamos Acero 5/8" 3/4" 1.91 2.84
1.59 cm 7/8" 2.22 3.87
2 cm2 1" 2.54 5.1
𝐸𝑆𝑃=(𝑆−2∗𝑟−𝜑𝑏)/(𝑛−1)
10.0330 1 3/8" 3.58 10.06
10
13.712222222
15 COLOCAR 10 ф 5/8" @ 15

7.5 cm 𝐴𝑠𝑡=𝑇/𝑆∗𝐴𝑠𝑢𝑠𝑎𝑟
22.93264234 cm2
1.4
1.6
Supongamos Acero 1/2"
1.27 cm
1.29 cm2 𝑆=(𝐵−2∗𝑟−𝜑𝑏)/(𝑛−1)

17.777242124
18
8.4547058824
10 COLOCAR 18 ф 1/2" @ 10
MEMORIA DE CALCULO CONCRETO ARMADO
CIM
PROYECTO CONSTRUCCIÓN DE VIVIENDA DE 2 PISOS + AZOTEA
UBICACIÓN JUNIN - HUANCAYO - HUANCAYO

ZAPATA AISLADA .30x.30

DATOS COLUMNA PROPIEDADES DEL SUELO

B 0.30 m Eje "X" q= 25.0 Ton*m2


H 0.30 m Eje "Y" %Pz 1.07 % Peso de zap.

CARGAS LONGITUDINAL CARGAS TRANSVERSAL


Pm = 7.72 Ton Pm = -
Pv = 1.22 Ton Pv = -
Mm = 0.00 Ton*m Mm = 0.00 Ton*m
Mv = 0.00 Ton*m Mv = 0.00 Ton*m
Ps = 1.56 Ton Ps = 0.86 Ton
Ms = 1.78 Ton*m Ms = 0.21 Ton*m

PREDIMENCIONAMIENTO
B= 0.90 m Eje"y" 𝑉𝑢𝑝=𝜎∗(𝐴
𝐴=(𝑃𝑡∗%𝑃𝑧)/(𝑞−3)
A= 0.43 m2 L= 0.90 m Eje"x"
At = 0.81 m2 > 0.43 m2 Cumple
𝜎=(𝑃𝑡∗%𝑃𝑧)/𝐴±6𝑀𝑙/(𝐿^2∗𝐵)
VERIFICACIONES ±6𝑀𝑡/(𝐵^2∗𝐿)

A. LONGITUDINAL Carga por Gravedad ESFUERZO ULTIMO


σ1 = 11.81 < 25.0 Ton*m2 Cumple σu (Gravedad)= 18.30 Ton/m2
σ2 = 11.81 < 25.0 Ton*m2 Cumple σu (Sismo)= 35.65 Ton/m2

B. TRANVERSAL Carga por Gravedad DISEÑO CORTE "X"


σ1 = 11.81 < 25.0 Ton*m2 Cumple H= 0.50 m
σ2 = 11.81 < 25.0 Ton*m2 Cumple D= 0.40 m
x
C. BIAXIAL Carga por Gravedad 𝑑
σ1 = 11.81 < 25.0 Ton*m2 Cumple
0.9

σ2 = 11.81 < 25.0 Ton*m2 Cumple


σ3 = 11.81 < 25.0 Ton*m2 Cumple
σ4 = 11.81 < 25.0 Ton*m2 Cumple
0.9
D. LONGITUDINAL Carga por Sismo
σ1 = 28.52 < 32.5 Ton*m2 Cumple x= 0.20 m 𝑉𝑢=𝜎∗𝐵∗𝑋
𝑉𝑢=𝜎∗𝐵∗𝑋
σ2 = -0.78 < 32.5 Ton*m2 Cumple ᴓVc 23.50 Ton
Vu= 6.42 Ton <
E. TRANVERSAL Carga por Sismo
σ1 = 8.95 < 32.5 Ton*m2 Cumple DISEÑO CORTE "y"
σ2 = 12.40 < 32.5 Ton*m2 Cumple

F. BIAXIAL Carga por Sismo LONGITUDINAL

0.9
σ1 = -4.90 < 32.5 Ton*m2 Cumple
σ2 = 24.40 < 32.5 Ton*m2 Cumple
σ3 = -4.90 < 32.5 Ton*m2 Cumple
σ4 = 24.40 < 32.5 Ton*m2 Cumple 0.9

G. BIAXIAL Carga por Sismo TRANVERS x= 0.20 m


σ1 = 14.67 < 14.3*1.3 32.5 Tn-m2
ok ᴓVc 23.50 Ton
σ2 = 14.67 < 14.3*1.3 32.5 Tn-m2 ok Vu= 6.42 Ton <
σ3 = 11.22 < 14.3*1.3 32.5 Tn-m2 ok
σ4 = 11.22 < 14.3*1.3 32.5 Tn-m2 ok
O ARMADO DISEÑO POR PUNZONAMIENTO "X"
CIMENTACIONES
+ AZOTEA H= 0.50 m
5/30/2021
O D= 0.40 m

0.9
a

Fc 210 Kg/cm2
Fy 4200 kg/cm2 0.9
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑

Bc 1
d/2 = 0.20 m
a= 0.50 m
b= 0.70 m
Bo = 1.70 m

| ØVcp (1) = 136.53 Ton


ØVcp (2) = 92.14 Ton norma < NO
ØVc (max) = 92.14 Ton
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜) Vup = 16.40 Ton < 92.14 Ton
Cumple
Cumple DISEÑO POR PUNZONAMIENTO

b
0.9

8.30 Ton/m2
5.65 Ton/m2 a

0.9
Bc 1
d/2 0.2

a 0.7
b 0.7
Bo 2.8
Vcp= 264.55
Vcp= 178.53 norma < NO
Vcp=
ᴓ= 0.85 ᴓVcp 151.75
𝑉𝑢=𝜎∗𝐵∗𝑋 Vup 11.408 < 151.75 OK
𝑉𝑢=𝜎∗𝐵∗𝑋
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑
23.50 Ton
Cumple
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜)

ᴓ 5/8" @15cm

1.4 m
ᴓ 5/8" @15m
23.50 Ton
Cumple
1.4 m 1.4 m
DISEÑO POR FLEXION "X" ACERO EN LA DIRECCION LONGITUDNAL
Rec
S=
T=

0.9
S
*Supongamos Acero
0.9 Diam
B= 100 cm Ab=
T
Nro Varillas=
x= 0.60 m
Mu = 5.78 Ton*m ESP=
w= 0.0193527468798022
Cuantilla = 0.00096763734399011
Asreq = 3.87 cm2
As min 7.20 cm2 ACERO EN LA DIRECCION TRANSVERSAL
r=
1" 1 varillas Ast=
3/4" 3 varillas S=
5/8" 4 varillas T=
S *Supongamos Acero
s 1" 90.0 30 Diam
s 3/4" 30.0 30 Ab=
s 5/8" 23.0 15 T Nro Varillas=

S=
s 15

DISEÑO POR FLEXION "Y"


0.9

0
0.9

X 0.3
Mu 1.44
Ku 0.00
Þ 0.0005
Þ 0.0018
As 1620.00 cm2
As min 2160.00 cm2

1" 424 varillas


3/4" 761 varillas
5/8" 1137 varillas

s 1" 0.0 0
s 3/4" 0.0 0
s 5/8" 0.0 15

s 15
50 cm

1.4 m
ᴓ 5/8" @15 cm
BARRA db(cm) Ab(cm2)
7.5 cm 8 mm 0.8 0.5
0.9 m 3/8" 0.95 0.71
0.9 m 1/2" 1.27 1.29
5/8" 1.59 2
Supongamos Acero 5/8" 3/4" 1.91 2.84
1.59 cm 7/8" 2.22 3.87
2 cm2 1" 2.54 5.1
𝐸𝑆𝑃=(𝑆−2∗𝑟−𝜑𝑏)/(𝑛−1)
3.6000 1 3/8" 3.58 10.06
3.5
29.364
30 COLOCAR 3.5 ф 5/8" @ 30

7.5 cm 𝐴𝑠𝑡=𝑇/𝑆∗𝐴𝑠𝑢𝑠𝑎𝑟
7.2 cm2
0.9
0.9
Supongamos Acero 1/2"
1.27 cm
1.29 cm2 𝑆=(𝐵−2∗𝑟−𝜑𝑏)/(𝑛−1)

5.5813953488
5.5
16.384444444
15 COLOCAR 5.5 ф 1/2" @ 15
MEMORIA DE CALCULO CONCRETO ARMADO
CIM
PROYECTO CONSTRUCCIÓN DE VIVIENDA DE 2 PISOS + AZOTEA
UBICACIÓN JUNIN - HUANCAYO - HUANCAYO

ZAPATA AISLADA .50x.30

DATOS COLUMNA PROPIEDADES DEL SUELO

B 0.50 m Eje "X" q= 25.0 Ton*m2


H 0.30 m Eje "Y" %Pz 1.07 % Peso de zap.

CARGAS LONGITUDINAL CARGAS TRANSVERSAL


Pm = 10.95 Ton Pm = -
Pv = 1.69 Ton Pv = -
Mm = 0.00 Ton*m Mm = 0.00 Ton*m
Mv = 0.00 Ton*m Mv = 0.00 Ton*m
Ps = 10.79 Ton Ps = 19.76 Ton
Ms = 6.55 Ton*m Ms = 0.40 Ton*m

PREDIMENCIONAMIENTO
B= 1.10 m Eje"y" 𝑉𝑢𝑝=𝜎∗(𝐴
𝐴=(𝑃𝑡∗%𝑃𝑧)/(𝑞−3)
A= 0.61 m2 L= 1.30 m Eje"x"
At = 1.43 m2 > 0.61 m2 Cumple
𝜎=(𝑃𝑡∗%𝑃𝑧)/𝐴±6𝑀𝑙/(𝐿^2∗𝐵)
VERIFICACIONES ±6𝑀𝑡/(𝐵^2∗𝐿)

A. LONGITUDINAL Carga por Gravedad ESFUERZO ULTIMO


σ1 = 9.46 < 25.0 Ton*m2 Cumple σu (Gravedad)= 14.66 Ton/m2
σ2 = 9.46 < 25.0 Ton*m2 Cumple σu (Sismo)= 48.34 Ton/m2

B. TRANVERSAL Carga por Gravedad DISEÑO CORTE "X"


σ1 = 9.46 < 25.0 Ton*m2 Cumple H= 0.50 m
σ2 = 9.46 < 25.0 Ton*m2 Cumple D= 0.40 m
x
C. BIAXIAL Carga por Gravedad 𝑑
σ1 = 9.46 < 25.0 Ton*m2 Cumple
1.1

σ2 = 9.46 < 25.0 Ton*m2 Cumple


σ3 = 9.46 < 25.0 Ton*m2 Cumple
σ4 = 9.46 < 25.0 Ton*m2 Cumple
1.3
D. LONGITUDINAL Carga por Sismo
σ1 = 38.67 < 32.5 Ton*m2 no Cumple x= 0.40 m 𝑉𝑢=𝜎∗𝐵∗𝑋
𝑉𝑢=𝜎∗𝐵∗𝑋
σ2 = -3.61 < 32.5 Ton*m2 Cumple ᴓVc 28.72 Ton
Vu= 21.27 Ton <
E. TRANVERSAL Carga por Sismo
σ1 = -6.85 < 32.5 Ton*m2 Cumple DISEÑO CORTE "y"
σ2 = -3.80 < 32.5 Ton*m2 Cumple

F. BIAXIAL Carga por Sismo LONGITUDINAL

1.3
σ1 = -19.76 < 32.5 Ton*m2 Cumple
σ2 = 22.52 < 32.5 Ton*m2 Cumple
σ3 = -19.76 < 32.5 Ton*m2 Cumple
σ4 = 22.52 < 32.5 Ton*m2 Cumple 1.1

G. BIAXIAL Carga por Sismo TRANVERS x= 0.40 m


σ1 = 25.77 < 14.3*1.3 32.5 Tn-m2
ok ᴓVc 33.95 Ton
σ2 = 25.77 < 14.3*1.3 32.5 Tn-m2 ok Vu= 25.14 Ton <
σ3 = 22.72 < 14.3*1.3 32.5 Tn-m2 ok
σ4 = 22.72 < 14.3*1.3 32.5 Tn-m2 ok
O ARMADO DISEÑO POR PUNZONAMIENTO "X"
CIMENTACIONES
+ AZOTEA H= 0.50 m
5/30/2021
O D= 0.40 m

1.1
a

Fc 210 Kg/cm2
Fy 4200 kg/cm2 1.3
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑

Bc 1.66666666666667
d/2 = 0.20 m
a= 0.70 m
b= 0.70 m
Bo = 2.10 m

| ØVcp (1) = 123.13 Ton


ØVcp (2) = 113.82 Ton norma < NO
ØVc (max) = 113.82 Ton
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜) Vup = 45.44 Ton < 113.82 Ton
Cumple
Cumple DISEÑO POR PUNZONAMIENTO

b
1.3

4.66 Ton/m2
8.34 Ton/m2 a

1.1
Bc 1.66666666666667
d/2 0.2

a 0.7
b 0.9
Bo 3.2
Vcp= 220.73
Vcp= 204.04 norma < NO
Vcp=
ᴓ= 0.85 ᴓVcp 173.43
𝑉𝑢=𝜎∗𝐵∗𝑋 Vup 38.672 < 173.43 OK
𝑉𝑢=𝜎∗𝐵∗𝑋
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑
28.72 Ton
Cumple
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜)

ᴓ 5/8" @15cm

1.4 m
ᴓ 5/8" @15m
33.95 Ton
Cumple
1.4 m 1.4 m
DISEÑO POR FLEXION "X" ACERO EN LA DIRECCION LONGITUDNAL
Rec
S=
T=

1.1
S
*Supongamos Acero
1.3 Diam
B= 100 cm Ab=
T
Nro Varillas=
x= 0.80 m
Mu = 17.02 Ton*m ESP=
w= 0.0583076474997635
Cuantilla = 0.00291538237498817
Asreq = 11.66 cm2
As min 7.20 cm2 ACERO EN LA DIRECCION TRANSVERSAL
r=
1" 2 varillas Ast=
3/4" 4 varillas S=
5/8" 6 varillas T=
S *Supongamos Acero
s 1" 55.0 30 Diam
s 3/4" 28.0 28 Ab=
s 5/8" 18.0 15 T Nro Varillas=

S=
s 15

DISEÑO POR FLEXION "Y"


1.3

0
1.1

X 0.4
Mu 5.03
Ku 0.00
Þ 0.0005
Þ 0.0018
As 2340.00 cm2
As min 3120.00 cm2

1" 612 varillas


3/4" 1099 varillas
5/8" 1642 varillas

s 1" 0.0 0
s 3/4" 0.0 0
s 5/8" 0.0 15

s 15
50 cm

1.4 m
ᴓ 5/8" @15 cm
BARRA db(cm) Ab(cm2)
7.5 cm 8 mm 0.8 0.5
1.1 m 3/8" 0.95 0.71
1.3 m 1/2" 1.27 1.29
5/8" 1.59 2
Supongamos Acero 5/8" 3/4" 1.91 2.84
1.59 cm 7/8" 2.22 3.87
2 cm2 1" 2.54 5.1
𝐸𝑆𝑃=(𝑆−2∗𝑟−𝜑𝑏)/(𝑛−1)
5.8308 1 3/8" 3.58 10.06
6
18.682
20 COLOCAR 6 ф 5/8" @ 20

7.5 cm 𝐴𝑠𝑡=𝑇/𝑆∗𝐴𝑠𝑢𝑠𝑎𝑟
13.781807591 cm2
1.1
1.3
Supongamos Acero 1/2"
1.27 cm
1.29 cm2 𝑆=(𝐵−2∗𝑟−𝜑𝑏)/(𝑛−1)

10.683571776
10.5
11.971578947
10 COLOCAR 10.5 ф 1/2" @ 10
MEMORIA DE CALCULO CONCRETO ARMADO
CIM
PROYECTO CONSTRUCCIÓN DE VIVIENDA DE 2 PISOS + AZOTEA
UBICACIÓN JUNIN - HUANCAYO - HUANCAYO

ZAPATA AISLADA .40x.30

DATOS COLUMNA PROPIEDADES DEL SUELO

B 0.45 m Eje "X" q= 25.0 Ton*m2


H 0.30 m Eje "Y" %Pz 1.07 % Peso de zap.

CARGAS LONGITUDINAL CARGAS TRANSVERSAL


Pm = 60.51 Ton Pm = -
Pv = 11.00 Ton Pv = -
Mm = 0.00 Ton*m Mm = 0.00 Ton*m
Mv = 0.00 Ton*m Mv = 0.00 Ton*m
Ps = 7.75 Ton Ps = 4.45 Ton
Ms = 6.43 Ton*m Ms = 4.56 Ton*m

PREDIMENCIONAMIENTO
B= 1.75 m Eje"y" 𝑉𝑢𝑝=𝜎∗(𝐴
𝐴=(𝑃𝑡∗%𝑃𝑧)/(𝑞−3)
A= 3.48 m2 L= 1.90 m Eje"x"
At = 3.33 m2 > 3.48 m2 No Cumple
𝜎=(𝑃𝑡∗%𝑃𝑧)/𝐴±6𝑀𝑙/(𝐿^2∗𝐵)
VERIFICACIONES ±6𝑀𝑡/(𝐵^2∗𝐿)

A. LONGITUDINAL Carga por Gravedad ESFUERZO ULTIMO


σ1 = 23.01 < 25.0 Ton*m2 Cumple σu (Gravedad)= 35.67 Ton/m2
σ2 = 23.01 < 25.0 Ton*m2 Cumple σu (Sismo)= 39.52 Ton/m2

B. TRANVERSAL Carga por Gravedad DISEÑO CORTE "X"


σ1 = 23.01 < 25.0 Ton*m2 Cumple H= 0.70 m
σ2 = 23.01 < 25.0 Ton*m2 Cumple D= 0.60 m
x
C. BIAXIAL Carga por Gravedad 𝑑
σ1 = 23.01 < 25.0 Ton*m2 Cumple
1.75

σ2 = 23.01 < 25.0 Ton*m2 Cumple


σ3 = 23.01 < 25.0 Ton*m2 Cumple
σ4 = 23.01 < 25.0 Ton*m2 Cumple
1.9
D. LONGITUDINAL Carga por Sismo
σ1 = 31.61 < 32.5 Ton*m2 Cumple x= 0.85 m 𝑉𝑢=𝜎∗𝐵∗𝑋
𝑉𝑢=𝜎∗𝐵∗𝑋
σ2 = 19.40 < 32.5 Ton*m2 Cumple ᴓVc 68.55 Ton
Vu= 58.78 Ton <
E. TRANVERSAL Carga por Sismo
σ1 = 16.88 < 32.5 Ton*m2 Cumple DISEÑO CORTE "y"
σ2 = 26.28 < 32.5 Ton*m2 Cumple

F. BIAXIAL Carga por Sismo LONGITUDINAL

1.9
σ1 = 14.41 < 32.5 Ton*m2 Cumple
σ2 = 26.63 < 32.5 Ton*m2 Cumple
σ3 = 14.41 < 32.5 Ton*m2 Cumple
σ4 = 26.63 < 32.5 Ton*m2 Cumple 1.75

G. BIAXIAL Carga por Sismo TRANVERS x= 0.85 m


σ1 = 29.15 < 14.3*1.3 32.5 Tn-m2
ok ᴓVc 74.42 Ton
σ2 = 29.15 < 14.3*1.3 32.5 Tn-m2 ok Vu= 63.82 Ton <
σ3 = 19.74 < 14.3*1.3 32.5 Tn-m2 ok
σ4 = 19.74 < 14.3*1.3 32.5 Tn-m2 ok
O ARMADO DISEÑO POR PUNZONAMIENTO "X"
CIMENTACIONES
+ AZOTEA H= 0.70 m
5/30/2021
O D= 0.60 m

1.75
a

Fc 210 Kg/cm2
Fy 4200 kg/cm2 1.9
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑

Bc 1.5
d/2 = 0.30 m
a= 0.75 m
b= 0.90 m
Bo = 2.40 m

| ØVcp (1) = 224.08 Ton


ØVcp (2) = 195.11 Ton norma < NO
ØVc (max) = 195.11 Ton
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜) Vup = 104.72 Ton < 195.11 Ton
Cumple
No Cumple DISEÑO POR PUNZONAMIENTO

b
1.9

5.67 Ton/m2
9.52 Ton/m2 a

1.75
Bc 1.5
d/2 0.3

a 0.9
b 1.05
Bo 3.9
Vcp= 428.39
Vcp= 373.01 norma < NO
Vcp=
ᴓ= 0.85 ᴓVcp 317.06
𝑉𝑢=𝜎∗𝐵∗𝑋 Vup 94.049 < 317.06 OK
𝑉𝑢=𝜎∗𝐵∗𝑋
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑
68.55 Ton
Cumple
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜)

ᴓ 5/8" @15cm

1.4 m
ᴓ 5/8" @15m
74.42 Ton
Cumple
1.4 m 1.4 m
DISEÑO POR FLEXION "X" ACERO EN LA DIRECCION LONGITUDNAL
Rec
S=
T=

1.75
S
*Supongamos Acero
1.9 Diam
B= 100 cm Ab=
T
Nro Varillas=
x= 1.45 m
Mu = 72.70 Ton*m ESP=
w= 0.114631127949496
Cuantilla = 0.0057315563974748
Asreq = 34.39 cm2
As min 10.80 cm2 ACERO EN LA DIRECCION TRANSVERSAL
r=
1" 7 varillas Ast=
3/4" 12 varillas S=
5/8" 18 varillas T=
S *Supongamos Acero
s 1" 25.0 25 Diam
s 3/4" 15.0 15 Ab=
s 5/8" 10.0 15 T Nro Varillas=

S=
s 15

DISEÑO POR FLEXION "Y"


1.9

0
1.75

X 0.725
Mu 19.73
Ku 0.00
Þ 0.0005
Þ 0.0018
As 3420.00 cm2
As min 4560.00 cm2

1" 894 varillas


3/4" 1606 varillas
5/8" 2400 varillas

s 1" 0.0 0
s 3/4" 0.0 0
s 5/8" 0.0 15

s 15
50 cm

1.4 m
ᴓ 5/8" @15 cm
BARRA db(cm) Ab(cm2)
7.5 cm 8 mm 0.8 0.5
1.75 m 3/8" 0.95 0.71
1.9 m 1/2" 1.27 1.29
5/8" 1.59 2
Supongamos Acero 3/4" 3/4" 1.91 2.84
1.91 cm 7/8" 2.22 3.87
2.84 cm2 1" 2.54 5.1
𝐸𝑆𝑃=(𝑆−2∗𝑟−𝜑𝑏)/(𝑛−1)
12.1089 1 3/8" 3.58 10.06
12
14.371818182
15 COLOCAR 12 ф 3/4" @ 15

7.5 cm 𝐴𝑠𝑡=𝑇/𝑆∗𝐴𝑠𝑢𝑠𝑎𝑟
37.336995961 cm2
1.75
1.9
Supongamos Acero 5/8"
1.59 cm
2 cm2 𝑆=(𝐵−2∗𝑟−𝜑𝑏)/(𝑛−1)

18.66849798
18.5
9.9091428571
10 COLOCAR 18.5 ф 5/8" @ 10
DISEÑO DE ZAPATAS
DATOS:
ANCHO (B) LARGO (L)
COLUMNA (B*L)
0.5 0.3 ZAPATA
Pm Pv Dead
CARGAS (Ton)
14.4088 2.4628 Live
esfuerzo adm 2.5 kg/cm2 SISMO X Max
f'c= 210 kg/cm2 SISMO Y Max
hf= 1.5 m

LONGITUDINAL TRANSVERSAL %Pt esta en función


MCM -0.1095 ton.m 0.2659 ton.m 5% para esfuerzo adm=
MCV -0.0187 ton.m 0.1113 ton.m 8% para esfuerzo adm=
Msis 0.4029 ton.m 6.8353 ton.m 10 % para esfuerzo adm=<
Psis 14.2156 ton 19.6187 ton

HALLANDO EL ÁREA TENTATIVA

𝐴𝑡𝑒𝑛𝑡𝑎𝑡𝑖𝑣𝑎=(𝑃𝑡∗%𝑃𝑡)/(𝜎𝑎𝑑𝑚𝑖𝑠𝑖𝑏𝑙𝑒−0.3𝑘𝑔/𝑐𝑚2)

0.3
Atent= 18.221328 % = 0.828 m2
22 C1
0.91

B= 1.5 L
L= 1.3

Atent= 1.950 m2

VERIFICACIONES

A) GRAVEDAD LONGITUDINAL 25.00 Tn/m2

𝜎𝑎𝑐𝑡=(𝑃𝑡∗%𝑃𝑡)/(𝐴 𝑡𝑒𝑛𝑡)±6𝑀𝐿/(𝐵∗𝐿^2 )

𝝈 adm= 9.04 Tn/m2 CUMPLE!! 𝝙= 15.96


𝝙=
𝝙=
𝝈 adm= 9.65 Tn/m2 CUMPLE!! 𝝙= 15.35

B) GRAVEDAD TRANSVERSAL

𝜎𝑎𝑐𝑡=(𝑃𝑡∗%𝑃𝑡)/(𝐴 𝑡𝑒𝑛𝑡)±6𝑀𝑇/(𝐿∗𝐵^2 )

𝝈 adm= 10.12 Tn/m2 CUMPLE!! 𝝙= 14.88


𝝈 adm= 8.57 Tn/m2 CUMPLE!! 𝝙= 16.43

C) GRAVEDAD BIAXIAL

𝜎𝑎𝑐𝑡=(𝑃𝑡∗%𝑃𝑡)/(𝐴 𝑡𝑒𝑛𝑡)±6𝑀𝐿/(𝐵∗𝐿^2 )±6𝑀𝑇/(𝐿∗𝐵^2 )

𝝈 adm= 9.81 Tn/m2 CUMPLE!! 𝝙= 15.19


𝝈 adm= 8.27 Tn/m2 CUMPLE!! 𝝙= 16.73
𝝈 adm= 10.42 Tn/m2 CUMPLE!! 𝝙= 14.58
𝝈 adm= 8.87 Tn/m2 CUMPLE!! 𝝙= 16.13

D) SISMO (+) LONGITUDINAL 32.50 Tn/m2

𝜎𝑎𝑐𝑡=((𝑃𝑡+𝑃𝑠𝑖𝑠𝐿)∗%𝑃𝑡)/(𝐴 𝑡𝑒𝑛𝑡)±(6(𝑀𝐿+𝑀𝑠𝑖𝑠𝐿))/(𝐵∗𝐿^2 )

𝝈 adm= 17.71 Tn/m2 CUMPLE!! 𝝙= 14.79


𝝈 adm= 16.41 Tn/m2 CUMPLE!! 𝝙= 16.09

E) SISMO (-) LONGITUDINAL

𝜎𝑎𝑐𝑡=((𝑃𝑡−𝑃𝑠𝑖𝑠𝐿)∗%𝑃𝑡)/(𝐴 𝑡𝑒𝑛𝑡)±(6(𝑀𝐿−𝑀𝑠𝑖𝑠𝐿))/(𝐵∗𝐿^2 )

𝝈 adm= 0.20 Tn/m2 CUMPLE!! 𝝙= 32.30


𝝈 adm= 2.71 Tn/m2 CUMPLE!! 𝝙= 29.79

F) SISMO (+) TRANSVERSAL

𝜎𝑎𝑐𝑡=((𝑃𝑡+𝑃𝑠𝑖𝑠𝑇)∗%𝑃𝑡)/(𝐴 𝑡𝑒𝑛𝑡)±(6(𝑀𝑇+𝑀𝑠𝑖𝑠𝑇))/(𝐿∗𝐵^2 )

𝝈 adm= 34.82 Tn/m2 𝝙=


INCREMENTAR DIMENCIO -2.32
𝝙=
𝝙=
𝝈 adm= 5.23 Tn/m2 CUMPLE!! 𝝙= 27.27

G) SISMO (-) TRANSVERSAL

𝜎𝑎𝑐𝑡=((𝑃𝑡−𝑃𝑠𝑖𝑠𝑇)∗%𝑃𝑡)/(𝐴 𝑡𝑒𝑛𝑡)±(6(𝑀𝑇−𝑀𝑠𝑖𝑠𝑇))/(𝐿∗𝐵^2 )

𝝈 adm= -14.75 Tn/m2 CUMPLE!! 𝝙= 47.25


𝝈 adm= 11.74 Tn/m2 CUMPLE!! 𝝙= 20.76

D) SISMO (+) LONGITUDINAL - BIAXIAL

𝜎𝑎𝑐𝑡=((𝑃𝑡+𝑃𝑠𝑖𝑠𝐿)∗%𝑃𝑡)/(𝐴 𝑡𝑒𝑛𝑡)±(6(𝑀𝐿+𝑀𝑠𝑖𝑠𝐿))/(𝐵∗𝐿^2 )±(6(𝑀𝑇))/(𝐿∗𝐵^2 )

𝝈 adm= 18.48 Tn/m2 CUMPLE!! 𝝙= 14.02


𝝈 adm= 16.93 Tn/m3 CUMPLE!! 𝝙= 15.57
𝝈 adm= 15.63 Tn/m4 CUMPLE!! 𝝙= 16.87
𝝈 adm= 17.18 Tn/m5 CUMPLE!! 𝝙= 15.32
𝝙=
E) SISMO (-) LONGITUDINAL- BIAXIAL

𝜎𝑎𝑐𝑡=((𝑃𝑡−𝑃𝑠𝑖𝑠𝐿)∗%𝑃𝑡)/(𝐴 𝑡𝑒𝑛𝑡)±(6(𝑀𝐿−𝑀𝑠𝑖𝑠𝐿))/(𝐵∗𝐿^2 )±(6(𝑀𝑇))/(𝐿∗𝐵^2 )

𝝈 adm= 0.97 Tn/m2 CUMPLE!! 𝝙= 31.53


𝝈 adm= -0.57 Tn/m2 CUMPLE!! 𝝙= 33.07
𝝈 adm= 1.94 Tn/m2 CUMPLE!! 𝝙= 30.56
𝝈 adm= 3.49 Tn/m2 CUMPLE!! 𝝙= 29.01

F) SISMO (+) TRANSVERSAL

𝜎𝑎𝑐𝑡=((𝑃𝑡+𝑃𝑠𝑖𝑠𝑇)∗%𝑃𝑡)/(𝐴 𝑡𝑒𝑛𝑡)±(6(𝑀𝑇+𝑀𝑠𝑖𝑠𝑇))/(𝐿∗𝐵^2 )±(6(𝑀𝐿))/(𝐵∗𝐿^2 )

𝝈 adm= 34.51 Tn/m2 𝝙=


INCREMENTAR DIMENCIO -2.01
𝝈 adm= 35.12 Tn/m2 INCREMENTAR DIMENCIO
𝝙= -2.62
𝝈 adm= 5.53 Tn/m2 CUMPLE!! 𝝙= 26.97
𝝈 adm= 4.92 Tn/m2 CUMPLE!! 𝝙= 27.58

G) SISMO (-) TRANSVERSAL


𝜎𝑎𝑐𝑡=((𝑃𝑡−𝑃𝑠𝑖𝑠𝑇)∗%𝑃𝑡)/(𝐴 𝑡𝑒𝑛𝑡)±(6(𝑀𝑇−𝑀𝑠𝑖𝑠𝑇))/(𝐿∗𝐵^2 )±(6(𝑀𝐿))/(𝐵∗𝐿^2 )

𝝈 adm= -15.06 Tn/m2 CUMPLE!! 𝝙= 47.56


𝝈 adm= -14.45 Tn/m2 CUMPLE!! 𝝙= 46.95
𝝈 adm= 12.04 Tn/m2 CUMPLE!! 𝝙= 20.46
𝝈 adm= 11.44 Tn/m2 CUMPLE!! 𝝙= 21.06

HALLANDO EL ESFUERZO ÚLTIMO

𝝙min= -2.62 buscar y verificar donde se encuentra su incidencia


𝝈 adm= 34.51 Tn/m2

FACTOR DE AMPLIFICACIÓN
POR SISMO = 1.25
POR GRAVEDAD = 1.55

𝝈 último= 43.14 Tn/m2

DISEÑOS

DISEÑO POR CORTE

Ø b columna= 3/4" Ldg= 42 cm


H min= 60 H escogido= 50 cm
d= 40 cm 0.4

d X 𝑉𝑢=𝜎ú𝑙𝑡𝑖𝑚𝑜∗(𝑋∗𝐵)
Vu=
0.5
∅𝑉𝑐=0.85∗0.53∗√(𝐹^′ 𝑐
d 0.3 Ø Vc=
1.5 B
𝑆𝑖: ∅𝑉𝑐>𝑉𝑢 𝐶𝑢𝑚𝑝𝑙𝑒‼‼

X
𝑉𝑢=𝜎ú𝑙𝑡𝑖𝑚𝑜∗(𝑋∗𝐿)
Vu=
1.3
L ∅𝑉𝑐=0.85∗0.53∗√(𝐹^′ 𝑐
Ø Vc=
𝑆𝑖: ∅𝑉𝑐>𝑉𝑢 𝐶𝑢𝑚𝑝𝑙𝑒‼‼

DISEÑO POR PUNZONAMIENTO

d/2= 20 cm 0.2

d/2
At=
0.5 =Lo 𝐴𝑜=(𝐿𝑜+𝑑/2)∗(𝐵𝑜+

d/2 0.3 =Bo Ao=


1.5
b𝑜=𝑝𝑒𝑟𝑖𝑚𝑒𝑡𝑟𝑜=(𝐿𝑜+
bo=

𝑉𝑢𝑝=𝜎ú𝑙𝑡𝑖𝑚𝑜∗(𝐴𝑡−
Vup=
1.3
∅𝑉𝑐=0.85∗(0.53+1.1/(𝐿𝑚𝑎𝑐𝑜𝑙/𝑙𝑚𝑒𝑐

∅𝑉𝑐1=

∅𝑉𝑐=0.85∗1.1∗√(𝐹^′ 𝑐)∗𝑏

∅𝑉𝑐2=

𝑆𝑖: ∅𝑉𝑐>𝑉𝑢 𝐶𝑢𝑚𝑝𝑙𝑒‼


INCREMENTAR H

DISEÑO POR CORTANTE

X 1.00 𝑀𝑢𝑙𝐿=(𝜎ú𝑙𝑡𝑖𝑚𝑜∗𝑋^2∗𝐵

0.5
Mul L=
0.3
1.5 𝑀𝑢𝑙𝑇=(𝜎ú𝑙𝑡𝑖𝑚𝑜∗𝑋^2∗𝐿)

X
1.5
X
Mul T=

1.3

HALLANDO REQUERIMIENTOS DE ACERO

f'c= 210
f'y= 4200
Ø= 0.9
B= 150 cm
L= 130 cm
d= 40 cm

HALLANDO LA CUANTÍA MECANICA ACERO LONGITUDINAL

W= 0.15730 AREAS DE ACERO


CUANTÍA= 0.00786 6mm 0.28 cm2
8mm 0.5 cm2
As requerido= 40.90 cm2 3/8" 0.71 cm2
As mínimo= 10.80 cm2 12mm 1.13 cm2
1/2" 1.29 cm2
Ø de acero 3/4" 5/8" 2 cm2
N° aceros= 14.40 3/4" 2.84 cm2
redondeado= 15 1" 5.1 cm2

𝑆=(𝐿𝑇−(2∗𝑟+Ø ))/(𝑁−1)

S= 9.53
redondeado= 10

HALLANDO LA CUANTÍA MECANICA ACERO TRANSVERSAL

W= 0.15730 AREAS DE ACERO


CUANTÍA= 0.00786 6mm 0.28 cm2
8mm 0.5 cm2
As requerido= 40.90 cm2 3/8" 0.71 cm2
As mínimo= 9.36 cm2 12mm 1.13 cm2
1/2" 1.29 cm2
Ø de acero 3/4" 5/8" 2 cm2
N° aceros= 14.40 3/4" 2.84 cm2
redondeado= 15 1" 5.1 cm2

𝑆=(𝐿𝑇−(2∗𝑟+Ø ))/(𝑁−1)

S= 8.08
redondeado= 8

DETALLE DE CIMENTACIÓN PLANTA

ACERO TRANSVERSAL= 15 Ø 3/4" @


B

1.5

ACERO LONGITUDINAL= 15

1.3
L

DETALLE DE CIMENTACIÓN ELEVACIÓN

1.5

0.5
1.5

0.5 15 Ø

SOLADO= 0.1
1.3

15 Ø 3/4" @ 10
ZAPATAS

FZ MX MY
-14.4088 -0.1095 0.2659
-2.4628 -0.0187 0.1113
14.2156 0.0402 6.8353 y ml
19.6187 0.4029 0.5821 T
x
mt
%Pt esta en función al: L
para esfuerzo adm= 4 kg/cm2
para esfuerzo adm= 2.5 kg/cm2
para esfuerzo adm=< 1 kg/cm2

0.5 C1

B
C1

15.96 9.04
15.35 9.65
14.88 10.12
16.43 8.57
15.19 9.81
16.73 8.27
14.58 10.42
16.13 8.87
14.79 17.71
16.09 16.41
32.30 0.20
29.79 2.71
-2.32 34.82
27.27 5.23
47.25 -14.75
20.76 11.74
14.02 18.48
15.57 16.93
16.87 15.63
15.32 17.18
31.53 0.97
33.07 -0.57
30.56 1.94
29.01 3.49
-2.01 34.51
-2.62 35.12
26.97 5.53
27.58 4.92
47.56 -15.06
46.95 -14.45
20.46 12.04
21.06 11.44
𝑉𝑢=𝜎ú𝑙𝑡𝑖𝑚𝑜∗(𝑋∗𝐵)
38.83 Tn

∅𝑉𝑐=0.85∗0.53∗√(𝐹^′ 𝑐)∗𝑏∗𝑑
39.17 Tn

𝑆𝑖: ∅𝑉𝑐>𝑉𝑢 𝐶𝑢𝑚𝑝𝑙𝑒‼‼!


CUMPLE!!!

𝑉𝑢=𝜎ú𝑙𝑡𝑖𝑚𝑜∗(𝑋∗𝐿)
5.61 Tn

∅𝑉𝑐=0.85∗0.53∗√(𝐹^′ 𝑐)∗𝑏∗𝑑
33.95 Tn
𝑆𝑖: ∅𝑉𝑐>𝑉𝑢 𝐶𝑢𝑚𝑝𝑙𝑒‼‼!
CUMPLE!!!

𝐴𝑡=𝐵∗𝐿
1.95 m2
𝐴𝑜=(𝐿𝑜+𝑑/2)∗(𝐵𝑜+𝑑/2)

0.24 m2

b𝑜=𝑝𝑒𝑟𝑖𝑚𝑒𝑡𝑟𝑜=(𝐿𝑜+𝐵𝑜+𝑑)
1.00 m

𝑉𝑢𝑝=𝜎ú𝑙𝑡𝑖𝑚𝑜∗(𝐴𝑡−𝐴𝑜)
73.77 Tn

(0.53+1.1/(𝐿𝑚𝑎𝑐𝑜𝑙/𝑙𝑚𝑒𝑐𝑜𝑙))∗√(𝐹^′ 𝑐)∗𝑏𝑜∗𝑑

116.44 Tn

∅𝑉𝑐=0.85∗1.1∗√(𝐹^′ 𝑐)∗𝑏𝑜∗𝑑

54.20 Tn

𝑆𝑖: ∅𝑉𝑐>𝑉𝑢 𝐶𝑢𝑚𝑝𝑙𝑒‼‼!


INCREMENTAR H!!!

𝑀𝑢𝑙𝐿=(𝜎ú𝑙𝑡𝑖𝑚𝑜∗𝑋^2∗𝐵)/2

64.71 ton.m

𝑀𝑢𝑙𝑇=(𝜎ú𝑙𝑡𝑖𝑚𝑜∗𝑋^2∗𝐿)/2
56.09 ton.m

Ø
0.6
0.8
0.95
1.2
1.27
1.59
1.91
2.54

Ø
0.6
0.8
0.95
1.2
1.27
1.59
1.91
2.54

Ø 3/4" @ 10
3/4" @ 8
MEMORIA DE CALCULO CONCRETO ARMADO
CIM
PROYECTO CONSTRUCCIÓN DE VIVIENDA DE 2 PISOS + AZOTEA
UBICACIÓN JUNIN - HUANCAYO - HUANCAYO

ZAPATA AISLADA .40x.30

DATOS COLUMNA PROPIEDADES DEL SUELO

B 0.40 m Eje "X" q= 25.0 Ton*m2


H 0.30 m Eje "Y" %Pz 1.07 % Peso de zap.

CARGAS LONGITUDINAL CARGAS TRANSVERSAL


Pm = 8.43 Ton Pm = -
Pv = 1.23 Ton Pv = -
Mm = 0.00 Ton*m Mm = 0.00 Ton*m
Mv = 0.00 Ton*m Mv = 0.00 Ton*m
Ps = 9.08 Ton Ps = 5.68 Ton
Ms = 3.73 Ton*m Ms = 0.32 Ton*m

PREDIMENCIONAMIENTO
B= 1.10 m Eje"y" 𝑉𝑢𝑝=𝜎∗(𝐴
𝐴=(𝑃𝑡∗%𝑃𝑧)/(𝑞−3)
A= 0.47 m2 L= 1.20 m Eje"x"
At = 1.32 m2 > 0.47 m2 Cumple
𝜎=(𝑃𝑡∗%𝑃𝑧)/𝐴±6𝑀𝑙/(𝐿^2∗𝐵)
VERIFICACIONES ±6𝑀𝑡/(𝐵^2∗𝐿)

A. LONGITUDINAL Carga por Gravedad ESFUERZO ULTIMO


σ1 = 7.83 < 25.0 Ton*m2 Cumple σu (Gravedad)= 12.14 Ton/m2
σ2 = 7.83 < 25.0 Ton*m2 Cumple σu (Sismo)= 36.65 Ton/m2

B. TRANVERSAL Carga por Gravedad DISEÑO CORTE "X"


σ1 = 7.83 < 25.0 Ton*m2 Cumple H= 0.70 m
σ2 = 7.83 < 25.0 Ton*m2 Cumple D= 0.60 m
x
C. BIAXIAL Carga por Gravedad 𝑑
σ1 = 7.83 < 25.0 Ton*m2 Cumple
1.1

σ2 = 7.83 < 25.0 Ton*m2 Cumple


σ3 = 7.83 < 25.0 Ton*m2 Cumple
σ4 = 7.83 < 25.0 Ton*m2 Cumple
1.2
D. LONGITUDINAL Carga por Sismo
σ1 = 29.32 < 32.5 Ton*m2 Cumple x= 0.20 m 𝑉𝑢=𝜎∗𝐵∗𝑋
𝑉𝑢=𝜎∗𝐵∗𝑋
σ2 = 1.06 < 32.5 Ton*m2 Cumple ᴓVc 43.09 Ton
Vu= 8.06 Ton <
E. TRANVERSAL Carga por Sismo
σ1 = 1.90 < 32.5 Ton*m2 Cumple DISEÑO CORTE "y"
σ2 = 4.55 < 32.5 Ton*m2 Cumple

F. BIAXIAL Carga por Sismo LONGITUDINAL

1.2
σ1 = -13.66 < 32.5 Ton*m2 Cumple
σ2 = 14.60 < 32.5 Ton*m2 Cumple
σ3 = -13.66 < 32.5 Ton*m2 Cumple
σ4 = 14.60 < 32.5 Ton*m2 Cumple 1.1

G. BIAXIAL Carga por Sismo TRANVERS x= 0.20 m


σ1 = 13.76 < 14.3*1.3 32.5 Tn-m2
ok ᴓVc 47.00 Ton
σ2 = 13.76 < 14.3*1.3 32.5 Tn-m2 ok Vu= 8.80 Ton <
σ3 = 11.11 < 14.3*1.3 32.5 Tn-m2 ok
σ4 = 11.11 < 14.3*1.3 32.5 Tn-m2 ok
O ARMADO DISEÑO POR PUNZONAMIENTO "X"
CIMENTACIONES
+ AZOTEA H= 0.70 m
5/30/2021
O D= 0.60 m

1.1
a

Fc 210 Kg/cm2
Fy 4200 kg/cm2 1.2
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑

Bc 1.33333333333333
d/2 = 0.30 m
a= 0.70 m
b= 0.90 m
Bo = 2.30 m

| ØVcp (1) = 230.33 Ton


ØVcp (2) = 186.98 Ton norma < NO
ØVc (max) = 186.98 Ton
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜) Vup = 25.29 Ton < 186.98 Ton
Cumple
Cumple DISEÑO POR PUNZONAMIENTO

b
1.2

2.14 Ton/m2
6.65 Ton/m2 a

1.1
Bc 1.33333333333333
d/2 0.3

a 0.9
b 1
Bo 3.8
Vcp= 447.70
Vcp= 363.44 norma < NO
Vcp=
ᴓ= 0.85 ᴓVcp 308.93
𝑉𝑢=𝜎∗𝐵∗𝑋 Vup 15.393 < 308.93 OK
𝑉𝑢=𝜎∗𝐵∗𝑋
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑
43.09 Ton
Cumple
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜)

ᴓ 5/8" @15cm

1.4 m
ᴓ 5/8" @15m
47.00 Ton
Cumple
1.4 m 1.4 m
DISEÑO POR FLEXION "X" ACERO EN LA DIRECCION LONGITUDNAL
Rec
S=
T=

1.1
S
*Supongamos Acero
1.2 Diam
B= 100 cm Ab=
T
Nro Varillas=
x= 0.80 m
Mu = 12.90 Ton*m ESP=
w= 0.0192112448519165
Cuantilla = 0.00096056224259583
Asreq = 5.76 cm2
As min 10.80 cm2 ACERO EN LA DIRECCION TRANSVERSAL
r=
1" 2 varillas Ast=
3/4" 4 varillas S=
5/8" 6 varillas T=
S *Supongamos Acero
s 1" 55.0 30 Diam
s 3/4" 28.0 28 Ab=
s 5/8" 18.0 15 T Nro Varillas=

S=
s 15

DISEÑO POR FLEXION "Y"


1.2

0
1.1

X 0.4
Mu 3.52
Ku 0.00
Þ 0.0005
Þ 0.0018
As 2160.00 cm2
As min 2880.00 cm2

1" 565 varillas


3/4" 1014 varillas
5/8" 1516 varillas

s 1" 0.0 0
s 3/4" 0.0 0
s 5/8" 0.0 15

s 15
50 cm

1.4 m
ᴓ 5/8" @15 cm
BARRA db(cm) Ab(cm2)
7.5 cm 8 mm 0.8 0.5
1.1 m 3/8" 0.95 0.71
1.2 m 1/2" 1.27 1.29
5/8" 1.59 2
Supongamos Acero 3/4" 3/4" 1.91 2.84
1.91 cm 7/8" 2.22 3.87
2.84 cm2 1" 2.54 5.1
𝐸𝑆𝑃=(𝑆−2∗𝑟−𝜑𝑏)/(𝑛−1)
3.8028 1 3/8" 3.58 10.06
4
31.03
30 COLOCAR 4 ф 3/4" @ 30

7.5 cm 𝐴𝑠𝑡=𝑇/𝑆∗𝐴𝑠𝑢𝑠𝑎𝑟
11.781818182 cm2
1.1
1.2
Supongamos Acero 5/8"
1.59 cm
2 cm2 𝑆=(𝐵−2∗𝑟−𝜑𝑏)/(𝑛−1)

5.8909090909
6
20.682
20 COLOCAR 6 ф 5/8" @ 20
MEMORIA DE CALCULO CONCRETO ARMADO
CIM
PROYECTO CONSTRUCCIÓN DE CENTRO COMERCIAL 5 NIVELES
UBICACIÓN ORCOTUNA - HUANCAYO

ZAPATA AISLADA 50x30

DATOS COLUMNA PROPIEDADES DEL SUELO

B 0.30 m Eje "X" q= 25.0 Ton*m2


H 0.40 m Eje "Y" %Pz 1.07 % Peso de zap.

CARGAS LONGITUDINAL CARGAS TRANSVERSAL


Pm = 51.08 Ton Pm = -
Pv = 13.93 Ton Pv = -
Mm = 0.00 Ton*m Mm = 0.00 Ton*m
Mv = 0.00 Ton*m Mv = 0.00 Ton*m
Ps = 3.30 Ton Ps = 0.98 Ton
Ms = 5.60 Ton*m Ms = 0.13 Ton*m

PREDIMENCIONAMIENTO
B= 1.80 m Eje"y" 𝑉𝑢𝑝=𝜎∗(𝐴
𝐴=(𝑃𝑡∗%𝑃𝑧)/(𝑞−3)
A= 3.16 m2 L= 1.70 m Eje"x"
At = 3.06 m2 > 3.16 m2 No Cumple
𝜎=(𝑃𝑡∗%𝑃𝑧)/𝐴±6𝑀𝑙/(𝐿^2∗𝐵)
VERIFICACIONES ±6𝑀𝑡/(𝐵^2∗𝐿)

A. LONGITUDINAL Carga por Gravedad ESFUERZO ULTIMO


σ1 = 22.73 < 25.0 Ton*m2 Cumple σu (Gravedad)= 35.23 Ton/m2
σ2 = 22.73 < 25.0 Ton*m2 Cumple σu (Sismo)= 37.93 Ton/m2

B. TRANVERSAL Carga por Gravedad DISEÑO CORTE "X"


σ1 = 22.73 < 25.0 Ton*m2 Cumple H= 0.50 m
σ2 = 22.73 < 25.0 Ton*m2 Cumple D= 0.40 m
x
C. BIAXIAL Carga por Gravedad 𝑑
σ1 = 22.73 < 25.0 Ton*m2 Cumple
1.8

σ2 = 22.73 < 25.0 Ton*m2 Cumple


σ3 = 22.73 < 25.0 Ton*m2 Cumple
σ4 = 22.73 < 25.0 Ton*m2 Cumple
1.7
D. LONGITUDINAL Carga por Sismo
σ1 = 30.35 < 32.5 Ton*m2 Cumple x= 0.30 m 𝑉𝑢=𝜎∗𝐵∗𝑋
𝑉𝑢=𝜎∗𝐵∗𝑋
σ2 = 17.43 < 32.5 Ton*m2 Cumple ᴓVc 47.00 Ton
Vu= 20.48 Ton <
E. TRANVERSAL Carga por Sismo
σ1 = 22.25 < 32.5 Ton*m2 Cumple DISEÑO CORTE "y"
σ2 = 22.53 < 32.5 Ton*m2 Cumple

F. BIAXIAL Carga por Sismo LONGITUDINAL

1.7
σ1 = 15.12 < 32.5 Ton*m2 Cumple
σ2 = 28.04 < 32.5 Ton*m2 Cumple
σ3 = 15.12 < 32.5 Ton*m2 Cumple
σ4 = 28.04 < 32.5 Ton*m2 Cumple 1.8

G. BIAXIAL Carga por Sismo TRANVERS x= 0.30 m


σ1 = 23.22 < 14.3*1.3 32.5 Tn-m2
ok ᴓVc 44.39 Ton
σ2 = 23.22 < 14.3*1.3 32.5 Tn-m2 ok Vu= 19.35 Ton <
σ3 = 22.93 < 14.3*1.3 32.5 Tn-m2 ok
σ4 = 22.93 < 14.3*1.3 32.5 Tn-m2 ok
O ARMADO DISEÑO POR PUNZONAMIENTO "X"
CIMENTACIONES
5 NIVELES H= 0.50 m
10/2/2021
D= 0.40 m

1.8
a

Fc 210 Kg/cm2
Fy 4200 kg/cm2 1.7
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑

Bc 0.75
d/2 = 0.20 m
a= 0.70 m
b= 0.80 m
Bo = 3.00 m

| ØVcp (1) = 295.13 Ton


ØVcp (2) = 162.59 Ton norma < NO
ØVc (max) = 162.59 Ton
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜) Vup = 94.83 Ton < 162.59 Ton
Cumple
No Cumple DISEÑO POR PUNZONAMIENTO

b
1.7

5.23 Ton/m2
7.93 Ton/m2 a

1.8
Bc 0.75
d/2 0.2

a 0.8
b 0.7
Bo 3
Vcp= 347.21
Vcp= 191.29 norma < NO
Vcp=
ᴓ= 0.85 ᴓVcp 162.59
𝑉𝑢=𝜎∗𝐵∗𝑋 Vup 94.829 < 162.59 OK
𝑉𝑢=𝜎∗𝐵∗𝑋
∅𝑉𝑐𝑝=0.85∗(0.53∗1.1/(ℎ/𝑏))∗√210∗𝑏𝑜∗𝑑
47.00 Ton
Cumple
𝑉𝑢𝑝=𝜎∗(𝐴𝑡𝑜𝑡𝑎𝑙−𝐴𝑜)

ᴓ 5/8" @15cm

1.4 m
ᴓ 5/8" @15m
44.39 Ton
Cumple
1.4 m 1.4 m
DISEÑO POR FLEXION "X" ACERO EN LA DIRECCION LONGITUDNAL
Rec
S=
T=

1.8
S
*Supongamos Acero
1.7 Diam
B= 100 cm Ab=
T
Nro Varillas=
x= 0.70 m
Mu = 16.73 Ton*m ESP=
w= 0.057286118421395
Cuantilla = 0.00286430592106975
Asreq = 11.46 cm2
As min 7.20 cm2 ACERO EN LA DIRECCION TRANSVERSAL
r=
1" 2 varillas Ast=
3/4" 4 varillas S=
5/8" 6 varillas T=
S *Supongamos Acero
s 1" 90.0 30 Diam
s 3/4" 45.0 30 Ab=
s 5/8" 30.0 15 T Nro Varillas=

S=
s 15

DISEÑO POR FLEXION "Y"


1.7

0
1.8

X 0.7
Mu 15.80
Ku 0.00
Þ 0.0005
Þ 0.0018
As 3060.00 cm2
As min 4080.00 cm2

1" 800 varillas


3/4" 1437 varillas
5/8" 2147 varillas

s 1" 0.0 0
s 3/4" 0.0 0
s 5/8" 0.0 15

s 15
50 cm

1.4 m
ᴓ 5/8" @15 cm
BARRA db(cm) Ab(cm2)
7.5 cm 8 mm 0.8 0.5
1.8 m 3/8" 0.95 0.71
1.7 m 1/2" 1.27 1.29
5/8" 1.59 2
Supongamos Acero 5/8" 3/4" 1.91 2.84
1.59 cm 7/8" 2.22 3.87
2 cm2 1" 2.54 5.1
𝐸𝑆𝑃=(𝑆−2∗𝑟−𝜑𝑏)/(𝑛−1)
5.7286 1 3/8" 3.58 10.06
5.5
36.313333333
35 COLOCAR 5.5 ф 5/8" @ 35

7.5 cm 𝐴𝑠𝑡=𝑇/𝑆∗𝐴𝑠𝑢𝑠𝑎𝑟
10.820711257 cm2
1.8
1.7
Supongamos Acero 3/4"
1.91 cm
2.84 cm2 𝑆=(𝐵−2∗𝑟−𝜑𝑏)/(𝑛−1)

3.8101095977
4
51.03
50 COLOCAR 4 ф 3/4" @ 50

También podría gustarte