PARAPETO
MURO FONDO 1.00 1.00 1.00 2.30 1.20 2.76
LOSA
MURO FONDO 1.00 1.00 1.00 14.97 0.40 5.99
CAJA DE RECEPCIÓN
PAREDES LATERALES
MUROS 1.00 1.00 1.00 1.65 2.36 3.89
PARED POSTERIOR
MUROS 1.00 1.00 1.00 2.30 2.46 5.66
PARAPETO
MUROS 1.00 1.00 1.00 2.30 2.46 5.66
N°
DIAMETRO PESO LONGIT ELEM
ELEMENTO CANTIDAD Nº DE VECES (KG/M)
(PULGADAS) (KG) UD (M) ENTO
S
CAMARA - RECEPCION I - 2.30x1.65 hprom=2.50 m 127.90
PAREDES LATERALES (kg) 46.42
Restando 3/8" 0.56 0.75 -1.00 1.00 2.00 -0.84
Restando 3/8" 0.56 0.50 -1.00 1.00 2.00 -0.56
Restando 3/8" 0.56 0.25 -1.00 1.00 2.00 -0.28
Acero Superior 3/8" 0.56 2.45 2.00 1.00 2.00 5.49
Horizontal 3/8" 0.56 1.95 10.00 1.00 2.00 21.84
Vertical 3/8" 0.56 2.65 7.00 1.00 2.00 20.78
Restando Tubo TMC 36 3/8" 0.56 1.50 2.00 1.00 -1.00 -1.68
Restando Tubo TMC 36 3/8" 0.56 1.50 2.00 1.00 -1.00 -1.68
Restando Tubo TMC 36 3/8" 0.56 1.50 2.00 2.00 -1.00 -3.36
Restando Tubo TMC 36 3/8" 0.56 1.50 2.00 2.00 -1.00 -3.36
LOSA
LOSA 1.00 1.00 1.00 0.40 12.55 5.02
DESCUENTO INTERIOR -1.00 1.00 1.00 0.25 1.27 -0.32
METRADO DETALLADO
#REF! #REF! FECHA : #REF!
PARAPETO
MURO FONDO 1.00 1.00 1.00 2.30 0.50 1.90 2.19
DESCUENTO TUBERIA -1.00 1.00 1.00 0.38 0.64 -0.24
CAJA DE RECEPCIÓN
PAREDES LATERALES
MUROS 1.00 1.00 1.00 1.25 0.20 2.36 0.59
PARED POSTERIOR
MUROS 1.00 1.00 1.00 1.70 0.20 2.46 0.84
LOSA
LOSA 1.00 1.00 1.00 1.30 1.25 0.20 0.33
PARAPETO
MUROS 1.00 1.00 1.00 1.70 0.20 2.46 0.84
DESCUENTO DE TUBERIA -1.00 1.00 1.00 0.20 0.64 -0.13
CAJA DE RECEPCIÓN
LOSA 1.00 1.00 1.00 1.30 1.25 0.10 0.16