2.00
B
A N A
3.00
4.00
1.60
B B
10.70
1.70
7.00
C C
1.70
2.70
TT-SSAA
1.00
6.20
T
CABLE UPM2
LINEA BOB2
3.00
S
11.00
D
3.00
R
TC-2 D-2 89-2-5 TT-2 TI-2 89-2-3 89-2-2 52-2 89-2-1 AS-2 AS-1 89-1-1 52-1 89-1-2 89-1-3 TI-1 TT-1 D-1
29.40
89-2-6 89-2-4 89-1-4
5.00
T
CABLE UPM1
LINEA BOB1
3.00
S
11.00
3.00
E
R
TC-4 D-4 89-4-5 TT-4 TI-4 89-4-3 89-4-2 52-4 89-4-1 AS-4 AS-3 89-3-1 52-3 89-3-2 89-3-3 TI-3 TT-3 D-3
89-4-6 89-4-4 89-3-4
6.20
3.70
TT-B150
2.70
R S T R S T
2.00 3.00 4.00 3.00 3.50 2.50 3.00 4.00 3.50 3.00 5.50 5.50 6.50 5.50 3.00 3.00 3.50 4.00 3.00 2.00 17.00 7.00 9.00 2.00
4.00
8.50 2.50 3.00 3.00 2.50 2.50 3.00 3.00 2.50 8.50
81.00
F F
3.00
2.00
D C
G PAVIMENTO DE HORMIGON D-X DESCARGADOR 1. TODAS LAS MEDIDAS SE INDICAN EN METROS A MENOS QUE SE INDIQUE ESPECIFICAMENTE.
A 04/10/19 Envio para revisión M. Sosa Arq. A. Giraldez Ing. G. Cardozo G
2. RECORRIDO CABLES 150 KV Y CANALIZACION PARA CRUCE BAJO PAVIMENTO A CONFIRMAR. N° Fecha Descripción Dibujado por Revisado por Aprobado por
CONDUCTOR SIMPLE COLUMBINE TT-X TRANSFORMADOR DE TENSION
Contratista Responsable de la Obra: Cliente:
CONDUCTOR DOVE TI-X TRANSFORMADOR DE INTENSIDAD
Ing. G. Cardozo
Estándar:
A2
N° Doc.
PTO-PEM-MO-001
Revisión.
B