Está en la página 1de 3

COEFICIENTES CAUDAL DE DESCARGA

a 0.84 qi = qn (m^3/día/m2) 0.724


b 0.18 Lr (m) 18.554
c 0.66
d 0.83 qd (m^3/día/m2) 13.429
T (años, periodo de retorno) 2
M (mm) 148.26
t (min) 60 Q NETO Y F. DARCY
qd 13.429
i 60.314 SR (%) 0.082
K (m/dia) 864

CAUDAL DE INFILTRACIÓN Hb (m) 0.188


C 0.5 Hb (cm) 18.848
R=i 60.314

qi (m^3/día/m2) 0.724

LONGITUD RESULTANTE
W (m) 4.5
Sx (%) 2 0.02
S (%) 8 0.08

Sr (%) 8.246 0.082


Lr (m) 18.554
Q NETO Y PROF. FLUJO DERCARGA EN EL PAVIMENTO
qn 0.724 qn 0.724
K (m/dia) 864 Qp 319.680
W (m) 4.5
P 0.00084
HM (m) 0.20616 L (m) 98.154
HM (cm) 20.61553

DERCARGA EN BASE PERMEABLE


TIEMPO PARA DRENAR Qp 319.680
ne 0.250 K (m/dia) 864
K (m/dia) 864 SR (%) 0.082
SR (%) 0.082 Sx (%) 0.02
Lr (m) 18.554 Hb (m) 0.188
H (m) 0.240
L (m) 98.154
t50 (hr) 0.675

DERCARGA TIEMPO PARA DRENAR


Qp 319.680
t50 (hr) 0.675
W (m) 4.5
Hb (m) 0.188
ne 0.250
U 0.5

L (m) 84.845

Lprom (m) 93.717


CAUDAL
Qp 319.680
K (m/dia) 864
SR (%) 0.082
Sx (%) 0.02
Hb (m) 0.188
Lprom (m) 93.717

Qo

También podría gustarte