VALORIZACION
CURSO : Planificación y Control de Proyectos

DOCENTE : Mg. GUARNIZ FLORES, Joel

SECCIÓN : "B"

ALUMNO : SANTIAGO MATOS, ELVIS IVAN


OBRA POR CONTRATA
LA OBRA NO A PEDIDO ADELANTO DILERECTO Y ADELANTO DE MATERIALES

PARTIDAS METRADO C.U PRESUPUESTO


S 109.00 S/ 29.00 S/ 3,161.00
A 1.00 S/ 101.00 S/ 101.00
N 79.00 S/ 49.00 S/ 3,871.00
T 115.00 S/ 25.00 S/ 2,875.00
I 49.00 S/ 69.00 S/ 3,381.00
A 1.00 S/ 101.00 S/ 101.00
G 37.00 S/ 77.00 S/ 2,849.00
O 85.00 S/ 45.00 S/ 3,825.00
M 73.00 S/ 53.00 S/ 3,869.00
A 1.00 S/ 101.00 S/ 101.00
T 115.00 S/ 25.00 S/ 2,875.00
O 85.00 S/ 45.00 S/ 3,825.00
S 109.00 S/ 29.00 S/ 3,161.00
COSTO DIRECTO S/ 33,995.00
GG 15.00% S/ 5,099.25
UTIIDAD 8.00% S/ 2,719.60
SUB TOTAL S/ 41,813.85
IGV 18.00% S/ 7,526.49
COSTO DE OBRA S/ 49,340.34
OBRA POR CONTRATA
LA OBRA NO A PEDIDO ADELANTO DILERECTO Y ADELANTO DE MATERIALES

PARTIDAS METRADO C.U PRESUPUESTO MES 1 MES 2 MES 3 MES 4 MES 5


S 109.00 S/ 29.00 S/ 3,161.00 21.80 5.45 49.05 5.45 27.25
A 1.00 S/ 101.00 S/ 101.00 0.10 0.20 0.25 0.20 0.25
N 79.00 S/ 49.00 S/ 3,871.00 9.48 2.77 37.53 3.95 25.28
T 115.00 S/ 25.00 S/ 2,875.00 11.50 0.00 51.75 11.50 40.25
I 49.00 S/ 69.00 S/ 3,381.00 7.35 9.80 7.35 24.50 0.00
A 1.00 S/ 101.00 S/ 101.00 0.10 0.20 0.25 0.20 0.25
G 37.00 S/ 77.00 S/ 2,849.00 5.55 11.10 7.40 11.10 1.85
O 85.00 S/ 45.00 S/ 3,825.00 7.65 25.50 29.75 0.00 22.10
M 73.00 S/ 53.00 S/ 3,869.00 9.49 3.65 29.93 7.30 22.63
A 1.00 S/ 101.00 S/ 101.00 0.10 0.20 0.25 0.20 0.25
T 115.00 S/ 25.00 S/ 2,875.00 11.50 0.00 51.75 11.50 40.25
O 85.00 S/ 45.00 S/ 3,825.00 7.65 25.50 29.75 0.00 22.10
S 109.00 S/ 29.00 S/ 3,161.00 21.80 5.45 49.05 5.45 27.25
COSTO DIRECTO S/ 33,995.00 114.07 89.82 344.06 81.35 229.71
GG 15.00% S/ 5,099.25
UTIIDAD 8.00% S/ 2,719.60
SUB TOTAL 0 S/ 41,813.85
IGV 18.00% S/ 7,526.49
COSTO DE OBRA S/ 49,340.34
VARIA DE ACUERDO A COMO SE EMPESO SEGÚN EL MES
VALORIZACION PRIMER MES
LA OBRA NO A PEDIDO ADELANTO DILERECTO Y ADELANTO DE MATERIALES

ESTAMOS TOMANDO COMO SI RESIEN ESTUVIERAMOS ENPESANDO LA OBRA POR ELLO SOLO EN (ANTERIOR) EL METRADO ES 0

ANTERIOR ACTUAL ACUMULADO RESTANTE


PARTIDAS METRADO C.U PRESUPUESTO METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO %
S 109.00 S/ 29.00 S/ 3,161.00 0.00 S/ 0.00 0.00% 21.80 S/ 632.20 20.00% 21.80 S/ 632.20 20.000% 87.20 S/ 2,528.80 80.00%
A 1.00 S/ 101.00 S/ 101.00 0.00 S/ 0.00 0.00% 0.10 S/ 10.10 10.00% 0.10 S/ 10.10 10.00% 0.90 S/ 90.90 90.00%
N 79.00 S/ 49.00 S/ 3,871.00 0.00 S/ 0.00 0.00% 9.48 S/ 464.52 12.00% 9.48 S/ 464.52 12.00% 69.52 S/ 3,406.48 88.00%
T 115.00 S/ 25.00 S/ 2,875.00 0.00 S/ 0.00 0.00% 11.50 S/ 287.50 10.00% 11.50 S/ 287.50 10.00% 103.50 S/ 2,587.50 90.00%
I 49.00 S/ 69.00 S/ 3,381.00 0.00 S/ 0.00 0.00% 7.35 S/ 507.15 15.00% 7.35 S/ 507.15 15.00% 41.65 S/ 2,873.85 85.00%
A 1.00 S/ 101.00 S/ 101.00 0.00 S/ 0.00 0.00% 0.10 S/ 10.10 10.00% 0.10 S/ 10.10 10.00% 0.90 S/ 90.90 90.00%
G 37.00 S/ 77.00 S/ 2,849.00 0.00 S/ 0.00 0.00% 5.55 S/ 427.35 15.00% 5.55 S/ 427.35 15.00% 31.45 S/ 2,421.65 85.00%
O 85.00 S/ 45.00 S/ 3,825.00 0.00 S/ 0.00 0.00% 7.65 S/ 344.25 9.00% 7.65 S/ 344.25 9.00% 77.35 S/ 3,480.75 91.00%
M 73.00 S/ 53.00 S/ 3,869.00 0.00 S/ 0.00 0.00% 9.49 S/ 502.97 13.00% 9.49 S/ 502.97 13.00% 63.51 S/ 3,366.03 87.00%
A 1.00 S/ 101.00 S/ 101.00 0.00 S/ 0.00 0.00% 0.10 S/ 10.10 10.00% 0.10 S/ 10.10 10.00% 0.90 S/ 90.90 90.00%
T 115.00 S/ 25.00 S/ 2,875.00 0.00 S/ 0.00 0.00% 11.50 S/ 287.50 10.00% 11.50 S/ 287.50 10.00% 103.50 S/ 2,587.50 90.00%
O 85.00 S/ 45.00 S/ 3,825.00 0.00 S/ 0.00 0.00% 7.65 S/ 344.25 9.00% 7.65 S/ 344.25 9.00% 77.35 S/ 3,480.75 91.00%
S 109.00 S/ 29.00 S/ 3,161.00 0.00 S/ 0.00 0.00% 21.80 S/ 632.20 20.00% 21.80 S/ 632.20 20.00% 87.20 S/ 2,528.80 80.00%
COSTO DIRECTO S/ - S/ 33,995.00 S/ 0.00 114.07 S/ 4,460.19 114.07 S/ 4,460.19 S/ 29,534.81
GG 15.00% S/ 5,099.25 S/ 0.00 S/ 669.03 S/ 669.03 S/ 4,430.22
UTIIDAD 8.00% S/ 2,719.60 S/ 0.00 S/ 356.82 S/ 356.82 S/ 2,362.78
SUB TOTAL S/ 41,813.85 S/ 0.00 S/ 5,486.03 S/ 5,486.03 S/ 36,327.82
IGV 18.00% S/ 7,526.49 S/ 0.00 S/ 987.49 S/ 987.49 S/ 6,539.01
COSTO DE OBRA S/ 49,340.34 S/ 0.00 0.00% S/ 6,473.52 13.12% S/ 6,473.52 13.12% S/ 42,866.82 86.88%

PAGO DEL MES


VAL
LA OBRA NO A PE

ACUMULADO DEL MES 1

ANTERIOR
PARTIDAS METRADO C.U PRESUPUESTO METRADO MONTO
S 109.00 S/ 29.00 S/ 3,161.00 21.80 S/ 632.20
A 1.00 S/ 101.00 S/ 101.00 0.10 S/ 10.10
N 79.00 S/ 49.00 S/ 3,871.00 9.48 S/ 464.52
T 115.00 S/ 25.00 S/ 2,875.00 11.50 S/ 287.50
I 49.00 S/ 69.00 S/ 3,381.00 7.35 S/ 507.15
A 1.00 S/ 101.00 S/ 101.00 0.10 S/ 10.10
G 37.00 S/ 77.00 S/ 2,849.00 5.55 S/ 427.35
O 85.00 S/ 45.00 S/ 3,825.00 7.65 S/ 344.25
M 73.00 S/ 53.00 S/ 3,869.00 9.49 S/ 502.97
A 1.00 S/ 101.00 S/ 101.00 0.10 S/ 10.10
T 115.00 S/ 25.00 S/ 2,875.00 11.50 S/ 287.50
O 85.00 S/ 45.00 S/ 3,825.00 7.65 S/ 344.25
S 109.00 S/ 29.00 S/ 3,161.00 21.80 S/ 632.20
COSTO DIR S/ - S/ 33,995.00 114.07 S/ 4,460.19
GG 15.00% S/ 5,099.25 S/ 669.03
UTIIDAD 8.00% S/ 2,719.60 S/ 356.82
SUB TOTAL 0 S/ 41,813.85 S/ 5,486.03
IGV 18.00% S/ 7,526.49 S/ 987.49
COSTO DE O 0 S/ 49,340.34 S/ 6,473.52
VALORIZACION SEGUNDO MES
LA OBRA NO A PEDIDO ADELANTO DILERECTO Y ADELANTO DE MATERIALES

DO DEL MES 1

ERIOR ACTUAL ACUMULADO


% METRADO MONTO % METRADO MONTO
20.000% 5.45 S/ 158.05 5.00% 27.25 S/ 790.25
10.00% 0.20 S/ 20.20 20.00% 0.30 S/ 30.30
12.00% 2.77 S/ 135.49 3.50% 12.25 S/ 600.01
10.00% 0.00 S/ 0.00 0.00% 11.50 S/ 287.50
15.00% 9.80 S/ 676.20 20.00% 17.15 S/ 1,183.35
10.00% 0.20 S/ 20.20 20.00% 0.30 S/ 30.30
15.00% 11.10 S/ 854.70 30.00% 16.65 S/ 1,282.05
9.00% 25.50 S/ 1,147.50 30.00% 33.15 S/ 1,491.75
13.00% 3.65 S/ 193.45 5.00% 13.14 S/ 696.42
10.00% 0.20 S/ 20.20 20.00% 0.30 S/ 30.30
10.00% 0.00 S/ 0.00 0.00% 11.50 S/ 287.50
9.00% 25.50 S/ 1,147.50 30.00% 33.15 S/ 1,491.75
20.00% 5.45 S/ 158.05 5.00% 27.25 S/ 790.25
89.82 S/ 4,531.54 203.89 S/ 8,991.73
S/ 679.73 S/ 1,348.76
S/ 362.52 S/ 719.34
S/ 5,573.79 S/ 11,059.82
S/ 1,003.28 S/ 1,990.77
13.12% S/ 6,577.07 13.33% S/ 13,050.59

PAGO DEL MES PAGO ASTA LA FECHA


avance total de avance asta la fecha falta ejecutar

LADO RESTANTE
% METRADO MONTO %
25.000% 81.75 S/ 2,370.75 75.00%
30.00% 0.70 S/ 70.70 70.00%
15.50% 66.76 S/ 3,271.00 84.50%
10.00% 103.50 S/ 2,587.50 90.00%
35.00% 31.85 S/ 2,197.65 65.00%
30.00% 0.70 S/ 70.70 70.00%
45.00% 20.35 S/ 1,566.95 55.00%
39.00% 51.85 S/ 2,333.25 61.00%
18.00% 59.86 S/ 3,172.58 82.00%
30.00% 0.70 S/ 70.70 70.00%
10.00% 103.50 S/ 2,587.50 90.00%
39.00% 51.85 S/ 2,333.25 61.00%
25.00% 81.75 S/ 2,370.75 75.00%
S/ 25,003.28
S/ 3,750.49
S/ 2,000.26
S/ 30,754.03
S/ 5,535.73
26.45% S/ 36,289.75 73.55%

LA FECHA PAGO POR COBRAR


VA
LA OBRA NO A PED

ACUMULADO MES 2

ANTERIOR
PARTIDAS METRADO C.U PRESUPUESTO METRADO
S 109.00 S/ 29.00 S/ 3,161.00 27.25
A 1.00 S/ 101.00 S/ 101.00 0.30
N 79.00 S/ 49.00 S/ 3,871.00 12.25
T 115.00 S/ 25.00 S/ 2,875.00 11.50
I 49.00 S/ 69.00 S/ 3,381.00 17.15
A 1.00 S/ 101.00 S/ 101.00 0.30
G 37.00 S/ 77.00 S/ 2,849.00 16.65
O 85.00 S/ 45.00 S/ 3,825.00 33.15
M 73.00 S/ 53.00 S/ 3,869.00 13.14
A 1.00 S/ 101.00 S/ 101.00 0.30
T 115.00 S/ 25.00 S/ 2,875.00 11.50
O 85.00 S/ 45.00 S/ 3,825.00 33.15
S 109.00 S/ 29.00 S/ 3,161.00 27.25
COSTO DI S/ - S/ 33,995.00 203.89
GG 15.00% S/ 5,099.25
UTIIDAD 8.00% S/ 2,719.60
SUB TOTAL 0 S/ 41,813.85
IGV 18.00% S/ 7,526.49
COSTO DE 0 S/ 49,340.34

PAGO DE VALORZACION 1 Y 2
3277
VALORIZACION TERCER MES
LA OBRA NO A PEDIDO ADELANTO DILERECTO Y ADELANTO DE MATERIALES

ACUMULADO MES 2

ANTERIOR ACTUAL ACUMULADO


MONTO % METRADO MONTO % METRADO
S/ 790.25 25.00% 49.05 S/ 1,422.45 45.00% 76.30
S/ 30.30 30.00% 0.25 S/ 25.25 25.00% 0.55
S/ 600.01 15.50% 37.53 S/ 1,838.73 47.50% 49.77
S/ 287.50 10.00% 51.75 S/ 1,293.75 45.00% 63.25
S/ 1,183.35 35.00% 7.35 S/ 507.15 15.00% 24.50
S/ 30.30 30.00% 0.25 S/ 25.25 25.00% 0.55
S/ 1,282.05 45.00% 7.40 S/ 569.80 20.00% 24.05
S/ 1,491.75 39.00% 29.75 S/ 1,338.75 35.00% 62.90
S/ 696.42 18.00% 29.93 S/ 1,586.29 41.00% 43.07
S/ 30.30 30.00% 0.25 S/ 25.25 25.00% 0.55
S/ 287.50 10.00% 51.75 S/ 1,293.75 45.00% 63.25
S/ 1,491.75 39.00% 29.75 S/ 1,338.75 35.00% 62.90
S/ 790.25 25.00% 49.05 S/ 1,422.45 45.00% 76.30
S/ 8,991.73 344.06 S/ 12,687.62 547.94
S/ 1,348.76 S/ 1,903.14
S/ 719.34 S/ 1,015.01
S/ 11,059.82 S/ 15,605.77
S/ 1,990.77 S/ 2,809.04
S/ 13,050.59 26.45% S/ 18,414.80 37.32%

PAGO DE VALORZACION 1 Y 2 PAGO DEL MES PAGO ASTA LA FECHA


ES
O DE MATERIALES

ACUMULADO RESTANTE
MONTO % METRADO MONTO %
S/ 2,212.70 70.00% 32.70 S/ 948.30 30.00%
S/ 55.55 55.00% 0.45 S/ 45.45 45.00%
S/ 2,438.73 63.00% 29.23 S/ 1,432.27 37.00%
S/ 1,581.25 55.00% 51.75 S/ 1,293.75 45.00%
S/ 1,690.50 50.00% 24.50 S/ 1,690.50 50.00%
S/ 55.55 55.00% 0.45 S/ 45.45 45.00%
S/ 1,851.85 65.00% 12.95 S/ 997.15 35.00%
S/ 2,830.50 74.00% 22.10 S/ 994.50 26.00%
S/ 2,282.71 59.00% 29.93 S/ 1,586.29 41.00%
S/ 55.55 55.00% 0.45 S/ 45.45 45.00%
S/ 1,581.25 55.00% 51.75 S/ 1,293.75 45.00%
S/ 2,830.50 74.00% 22.10 S/ 994.50 26.00%
S/ 2,212.70 70.00% 32.70 S/ 948.30 30.00%
S/ 21,679.34 S/ 12,315.66
S/ 3,251.90 S/ 1,847.35
S/ 1,734.35 S/ 985.25
S/ 26,665.59 S/ 15,148.26
S/ 4,799.81 S/ 2,726.69
S/ 31,465.39 63.8% S/ 17,874.95 36.23%

PAGO ASTA LA FECHA PAGO POR COBRAR


VAL
LA OBRA NO A PED

ACUMULADO MES 2

ANTERIOR
PARTIDAS METRADO C.U PRESUPUESTO METRADO
S 109.00 S/ 29.00 S/ 3,161.00 76.30
A 1.00 S/ 101.00 S/ 101.00 0.55
N 79.00 S/ 49.00 S/ 3,871.00 49.77
T 115.00 S/ 25.00 S/ 2,875.00 63.25
I 49.00 S/ 69.00 S/ 3,381.00 24.50
A 1.00 S/ 101.00 S/ 101.00 0.55
G 37.00 S/ 77.00 S/ 2,849.00 24.05
O 85.00 S/ 45.00 S/ 3,825.00 62.90
M 73.00 S/ 53.00 S/ 3,869.00 43.07
A 1.00 S/ 101.00 S/ 101.00 0.55
T 115.00 S/ 25.00 S/ 2,875.00 63.25
O 85.00 S/ 45.00 S/ 3,825.00 62.90
S 109.00 S/ 29.00 S/ 3,161.00 76.30
COSTO DI S/ - S/ 33,995.00 547.94
GG 15.00% S/ 5,099.25
UTIIDAD 8.00% S/ 2,719.60
SUB TOTAL 0 S/ 41,813.85
IGV 18.00% S/ 7,526.49
COSTO DE 0 S/ 49,340.34

PAGO DE VALORZACION 1 Y 2
VALORIZACION TERCER MES
LA OBRA NO A PEDIDO ADELANTO DILERECTO Y ADELANTO DE MATERIALES

ACUMULADO MES 2

ANTERIOR ACTUAL ACUMULADO


MONTO % METRADO MONTO % METRADO
S/ 2,212.70 70.00% 5.45 S/ 158.05 5.00% 81.75
S/ 55.55 55.00% 0.20 S/ 20.20 20.00% 0.75
S/ 2,438.73 63.00% 3.95 S/ 193.55 5.00% 53.72
S/ 1,581.25 55.00% 11.50 S/ 287.50 10.00% 74.75
S/ 1,690.50 50.00% 24.50 S/ 1,690.50 50.00% 49.00
S/ 55.55 55.00% 0.20 S/ 20.20 20.00% 0.75
S/ 1,851.85 65.00% 11.10 S/ 854.70 30.00% 35.15
S/ 2,830.50 74.00% 0.00 S/ 0.00 0.00% 62.90
S/ 2,282.71 59.00% 7.30 S/ 386.90 10.00% 50.37
S/ 55.55 55.00% 0.20 S/ 20.20 20.00% 0.75
S/ 1,581.25 55.00% 11.50 S/ 287.50 10.00% 74.75
S/ 2,830.50 74.00% 0.00 S/ 0.00 0.00% 62.90
S/ 2,212.70 70.00% 5.45 S/ 158.05 5.00% 81.75
S/ 21,679.34 81.35 S/ 4,077.35 629.29
S/ 3,251.90 S/ 611.60
S/ 1,734.35 S/ 326.19
S/ 26,665.59 S/ 5,015.14
S/ 4,799.81 S/ 902.73
S/ 31,465.39 63.77% S/ 5,917.87 11.99%

PAGO DE VALORZACION 1 Y 2 PAGO DEL MES PAGO ASTA LA FECHA


ES
O DE MATERIALES

ACUMULADO RESTANTE
MONTO % METRADO MONTO %
S/ 2,370.75 75.00% 27.25 S/ 790.25 25.00%
S/ 75.75 75.00% 0.25 S/ 25.25 25.00%
S/ 2,632.28 68.00% 25.28 S/ 1,238.72 32.00%
S/ 1,868.75 65.00% 40.25 S/ 1,006.25 35.00%
S/ 3,381.00 100.00% 0.00 S/ 0.00 0.00%
S/ 75.75 75.00% 0.25 S/ 25.25 25.00%
S/ 2,706.55 95.00% 1.85 S/ 142.45 5.00%
S/ 2,830.50 74.00% 22.10 S/ 994.50 26.00%
S/ 2,669.61 69.00% 22.63 S/ 1,199.39 31.00%
S/ 75.75 75.00% 0.25 S/ 25.25 25.00%
S/ 1,868.75 65.00% 40.25 S/ 1,006.25 35.00%
S/ 2,830.50 74.00% 22.10 S/ 994.50 26.00%
S/ 2,370.75 75.00% 27.25 S/ 790.25 25.00%
S/ 25,756.69 S/ 8,238.31
S/ 3,863.50 S/ 1,235.75
S/ 2,060.54 S/ 659.06
S/ 31,680.73 S/ 10,133.12
S/ 5,702.53 S/ 1,823.96
S/ 37,383.26 75.8% S/ 11,957.08 24.23%

PAGO ASTA LA FECHA PAGO POR COBRAR


VAL
LA OBRA NO A PED

ACUMULADO MES 2

ANTERIOR
PARTIDAS METRADO C.U PRESUPUESTO METRADO
S 109.00 S/ 29.00 S/ 3,161.00 81.75
A 1.00 S/ 101.00 S/ 101.00 0.75
N 79.00 S/ 49.00 S/ 3,871.00 53.72
T 115.00 S/ 25.00 S/ 2,875.00 74.75
I 49.00 S/ 69.00 S/ 3,381.00 49.00
A 1.00 S/ 101.00 S/ 101.00 0.75
G 37.00 S/ 77.00 S/ 2,849.00 35.15
O 85.00 S/ 45.00 S/ 3,825.00 62.90
M 73.00 S/ 53.00 S/ 3,869.00 50.37
A 1.00 S/ 101.00 S/ 101.00 0.75
T 115.00 S/ 25.00 S/ 2,875.00 74.75
O 85.00 S/ 45.00 S/ 3,825.00 62.90
S 109.00 S/ 29.00 S/ 3,161.00 81.75
COSTO DI S/ - S/ 33,995.00 629.29
GG 15.00% S/ 5,099.25
UTIIDAD 8.00% S/ 2,719.60
SUB TOTAL 0 S/ 41,813.85
IGV 18.00% S/ 7,526.49
COSTO DE 0 S/ 49,340.34

PAGO DE VALORZACION 1 Y 2
VALORIZACION TERCER MES
LA OBRA NO A PEDIDO ADELANTO DILERECTO Y ADELANTO DE MATERIALES

ACUMULADO MES 2

ANTERIOR ACTUAL ACUMULADO


MONTO % METRADO MONTO % METRADO
S/ 2,370.75 75.00% 27.25 S/ 790.25 25.00% 109.00
S/ 55.55 75.00% 0.25 S/ 25.25 25.00% 1.00
S/ 2,632.28 68.00% 25.28 S/ 1,238.72 32.00% 79.00
S/ 1,581.25 65.00% 40.25 S/ 1,006.25 35.00% 115.00
S/ 3,381.00 100.00% 0.00 S/ 0.00 0.00% 49.00
S/ 55.55 75.00% 0.25 S/ 25.25 25.00% 1.00
S/ 2,706.55 95.00% 1.85 S/ 142.45 5.00% 37.00
S/ 2,830.50 74.00% 22.10 S/ 994.50 26.00% 85.00
S/ 2,669.61 69.00% 22.63 S/ 1,199.39 31.00% 73.00
S/ 55.55 75.00% 0.25 S/ 25.25 25.00% 1.00
S/ 1,868.75 65.00% 40.25 S/ 1,006.25 35.00% 115.00
S/ 2,830.50 74.00% 22.10 S/ 994.50 26.00% 85.00
S/ 2,370.75 75.00% 27.25 S/ 790.25 25.00% 109.00
S/ 25,408.59 229.71 S/ 8,238.31 859.00
S/ 3,811.29 S/ 1,235.75
S/ 2,032.69 S/ 659.06
S/ 31,252.57 S/ 10,133.12
S/ 5,625.46 S/ 1,823.96
S/ 36,878.03 74.74% S/ 11,957.08 24.23%

PAGO DE VALORZACION 1 Y 2 PAGO DEL MES PAGO ASTA LA FECHA


ES
O DE MATERIALES

ACUMULADO RESTANTE
MONTO % METRADO MONTO %
S/ 3,161.00 100.00% 0.00 S/ 0.00 0.00%
S/ 101.00 100.00% 0.00 S/ 0.00 0.00%
S/ 3,871.00 100.00% 0.00 S/ 0.00 0.00%
S/ 2,875.00 100.00% 0.00 S/ 0.00 0.00%
S/ 3,381.00 100.00% 0.00 S/ 0.00 0.00%
S/ 101.00 100.00% 0.00 S/ 0.00 0.00%
S/ 2,849.00 100.00% 0.00 S/ 0.00 0.00%
S/ 3,825.00 100.00% 0.00 S/ 0.00 0.00%
S/ 3,869.00 100.00% 0.00 S/ 0.00 0.00%
S/ 101.00 100.00% 0.00 S/ 0.00 0.00%
S/ 2,875.00 100.00% 0.00 S/ 0.00 0.00%
S/ 3,825.00 100.00% 0.00 S/ 0.00 0.00%
S/ 3,161.00 100.00% 0.00 S/ 0.00 0.00%
S/ 33,995.00 S/ 0.00
S/ 5,099.25 S/ 0.00
S/ 2,719.60 S/ 0.00
S/ 41,813.85 S/ 0.00
S/ 7,526.49 S/ 0.00
S/ 49,340.34 100.0% S/ 0.00 0.00%

PAGO ASTA LA FECHA PAGO POR COBRAR


PROGRAMADO EJECUTADO
AVANCE ACUMULADO AVANCE
% MONTO % MONTO %
MES 1 5.00% S/ 1,573.27 5.00% S/ 1,573.27 13.12%
MES 2 15.00% S/ 4,719.81 20.00% S/ 6,293.08 13.33%
MES 3 40.00% S/ 12,586.16 60.00% S/ 18,879.24 37.32%
MES 4 20.00% S/ 6,293.08 80.00% S/ 39,472.27 11.99%
MES 5 20.00% S/ 6,293.08 100.00% S/ 49,340.34 24.23%

LA CURVA S ES UN VS ENTRE LO QUE YO ESTOY EJECUTANDO Y LO QUE YO ME HE PROGRAMADO O

CURVA S
120.00%
100.00%
100.00%
80.00%
75.77%
80.00%
PORCENTAJE

63.77%
60.00%
60.00%

40.00% 26.45%
20.00%
20.00% 13.12%
5.00%
0.00%
0.5 1 1.5 2 2.5 3 3.5 4 4.5 5
VALORIZACIÓN
expediente tecnico
EJECUTADO cronograma
AVANCE ACUMULADO
MONTO % MONTO % DE AVANCE
S/ 6,473.52 13.12% S/ 6,473.52 262.40% comprobacion
S/ 6,577.07 26.45% ### 132.25% 26.45%
### 63.77% ### 106.29% 63.77%
S/ 5,917.87 75.77% ### 94.71% 75.77%
### 100.00% ### 100.00% 100.00%

QUE YO ME HE PROGRAMADO O LO QUE ME HAN PROGRANADO

RVA S
100.00%

80.00%
75.77%

PROGRAMADO
EJECUTADO

3.5 4 4.5 5 5.5


N
xpediente tecnico inicio de obra requisitos para firma del contrato
entrega de adelanto directo presentar el RNP
entrega de terreno CPM (cronograma)
designacion de supervicor o inspector
entrega del expediente tecnico
LA OBRA( contratista) A PEDIDO ADELANTO DILERECTO Y ADELANTO DE MATERIALES
valorizacion adelanto directo adelanto de materiales
penalidades
% Monto % Monto % Monto
10.00% S/ 4,934.03 20.00% S/ 9,868.07
MES 1 13.12% S/ 6,473.52 -S/ 647.35 -S/ 1,294.70
MES 2 13.33% S/ 6,577.07 -S/ 657.71 -S/ 1,315.41
MES 3 37.32% ### -S/ 1,841.48 -S/ 3,682.96
MES 4 11.99% S/ 5,917.87 -S/ 591.79 -S/ 1,183.57
MES 5 24.23% ### -S/ 1,195.71 -S/ 2,391.42
S/ 0.00 S/ 0.00
adelanto directo tiene un plazo para solicitar
total a adelanto de mteriales si no tiene fecha para solicitar
ESTADO
facturar

S/ 4,531.46 pagado
S/ 4,603.95 en tramite esc conveniente cabiar los montos totales que teniamos en la curva s
### en tramite por los nuevos montos calculados con la resta de adelanto y materiales?
S/ 4,142.51 en tramite
S/ 8,369.96 en tramite
os en la curva s
anto y materiales?