SECTORIZACIÓN

BZ-01DS
BZ-03DS
BZ-04DS
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
MOD ACTIVITY ID UNID. % AVANCE
###
###
CONSTRUCCIÓN V
PRO T1090 CASETA P/ OFICINA, GUARDIANIA Y DEPOSITO GLB 100.00% 1,400.00 1,400.00 1,400.00 1,400.00 1,400.00
###
PRO T1100 ENERGIA ELECTRICA PARA INSTALACIONES DEL CONTRATISTA GLB 100.00% 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00
###
PRO LIMPIEZA PERMANENTE DE OBRA GLB 100.00% 0.00 0.00 0.00 0.00 0.00
###
OBRAS PRELIMINARES ###
PRE T1130 SEÑALIZACION DE LA ZONA DE TRABAJO GLB 100.00% 450.00 450.00 450.00 450.00 450.00
###
PRE MOVILIZACION Y DESMOVILIZACION GLB 100.00% 0.00 0.00 0.00 0.00 0.00
###
PRE T1110 TRAZO Y REPLANTEO GLB 100.00% 450.00 450.00 450.00 450.00 450.00
###
RED DE DRENAJE SUPERFICIAL ###
RDS DISCIPLINA: CIVIL ###
RDS MOVIMIENTO DE TIERRAS PARA TUBERÍAS, CANALES Y BUZONES - RED DE DRENAJE SUPERFICIAL ###
RDS C6230 EXCAVACION CON EQUIPO m3 0.00% 1.53 477.00 477.00 0.00 0.00
###
RDS C6230 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.00% 0.13 160.00 160.00 0.00 0.00
###
RDS C6240 TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM<=1 KM m3 -KM 0.00% 0.16 3.00 3.00 0.00 0.00
###
RDS C6240 TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 0.00% 0.04 4.00 4.00 0.00 0.00
###
RDS C6240 COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 0.00% 3.42 55.00 55.00 0.00 0.00
###
RDS C6240 TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 0.00% 0.16 10.00 10.00 0.00 0.00
###
RDS C6240 TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KM Ref.) m3 -KM 0.00% 0.04 13.00 13.00 0.00 0.00
###
RDS C6240 RELLENO CON MATERIAL 2B DE PRESTAMO m3 0.00% 1.78 83.00 83.00 0.00 0.00
###
RDS C6240 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 0.00% 2.03 36.00 36.00 0.00 0.00
###
RDS C6240 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.00% 0.11 9.00 9.00 0.00 0.00
###
RDS C6240 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.00% 0.05 11.00 11.00 0.00 0.00
###
RDS C6240 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.00% 0.23 9.00 9.00 0.00 0.00
###
RDS CONCRETO ARMADO ###
RDS C6250 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 0.00% 6.18 124.00 124.00 0.00 0.00
###
RDS
RDS C6250 COLOCACIÓN DE CONCRETO F'c=20 MPa m3 0.00% 6.18 747.00 747.00 0.00 0.00
###
RDS C6250 ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 2.47 1,030.00 1,030.00 0.00 0.00
###
RDS C6250 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 922.00 922.00 0.00 0.00
###
RDS CURADO DE CONCRETO CON ADITIVO
RDS C6250 CURADO DE CONCRETO CON ANTISOL m2 0.00% 0.14 110.00 110.00 0.00 0.00
###
RDS CARPINTERIA METALICA ###
RDS C6270 SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.575m m 50.74% 3.67 1,800.00 1,800.00 913.00 913.00
###
RDS C6270 SUMINISTRO E INSTALACIÓN DE GRATING TMyP 3"x1/4"x1.30m m 54.90% 13.61 82.00 82.00 45.00 45.00
###
RDS C6270 SUMINISTRO E INSTALACIÓN DE GRATING TMyP 3"x1/4"x2.10m m 55.50% 18.15 73.00 73.00 40.00 40.00
###
RDS DISCIPLINA: INSTALACIONES SANITARIAS ###
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
RDS RED DE DRENAJE SUPERFICIAL - DRENAJE DE PUNTO DE AGUA Ø 2" ###
RDS C6260 PIPE, PVC-D3034, BELL, SDR 35 Ø2" m 0.00% 2.50 5.00 5.00 0.00 0.00
###
RDS C6260 EL, 90DEG, BELL. BELL, PVC-D3034 Ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RDS RED DE DRENAJE SUPERFICIAL-MONTANTE A CAJA DE REGISTRO DE DESGÜE Ø4" ###
RDS C6260 PIPE, PVC-D3034, BELL, SDR 35 Ø4" m 0.00% 1.52 194.00 194.00 0.00 0.00
###
RDS C6260 EL, 90DEG, BELL. BELL, PVC-D3034 Ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RDS RED DE DRENAJE SUPERFICIAL-ENTRE CAJAS DE REGISTRO DE DESGÜE Ø6" ###
RDS C6260 Pipe, PE D3350, PE, SDR 21 ø6" m 0.00% 2.00 10.00 10.00 0.00 0.00
###
SISTEMA DE RED DE AGUA POTABLE, AGUAS NEGRAS Y AGUAS GRISES ###
RAP RED DE AGUA POTABLE ###
RAP DISCIPLINA: CIVIL ###
RAP MOVIMIENTO DE TIERRAS PARA TUBERÍAS Y PUNTOS DE AGUA- RED DE AGUA POTABLE ###
RAP EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 96.10% 1.45 710.00 710.00 683.00 683.00
###
RAP EXCAVACION P/POZOS DE PUNTOS DE AGUA m3 33.33% 6.20 12.00 12.00 4.00 4.00
###
RAP REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 95.33% 0.13 240.00 240.00 228.00 228.00
###
RAP TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= 1 KM m3 -KM 92.65% 0.16 12.00 12.00 11.00 11.00
###
RAP TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM (Hasta 6.8 KM Ref.m3 -KM 92.49% 0.04 17.00 17.00 16.00 16.00
###
RAP COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 89.17% 3.42 208.00 208.00 186.00 186.00
###
RAP TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 87.31% 0.16 29.00 29.00 25.00 25.00
###
RAP TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KM Ref.) m3 -KM 87.27% 0.04 40.00 40.00 35.00 35.00
###
RAP RELLENO CON MATERIAL 2B DE PRESTAMO m3 83.07% 1.78 256.00 256.00 212.00 212.00
###
RAP RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 83.09% 2.03 575.00 575.00 478.00 478.00
###
RAP ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 92.02% 0.11 30.00 30.00 27.00 27.00
###
RAP ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 92.09% 0.05 24.00 24.00 22.00 22.00
###
RAP APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 92.05% 0.23 61.00 61.00 56.00 56.00
###
RAP CONCRETO ARMADO ###
RAP COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 0.00% 6.18 6.00 6.00 0.00 0.00
###
RAP CONCRETO SIMPLE ###
RAP COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 17.00 17.00 0.00 0.00
###
RAP ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 2.47 32.00 32.00 0.00 0.00
###
RAP SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 14.00 14.00 0.00 0.00
###
RAP CURADO DE CONCRETO CON ADITIVO
RAP CURADO DE CONCRETO CON ANTISOL m2 0.00% 0.14 2.00 2.00 0.00 0.00
###
RAP SUMINISTRO E INSTALACIÓN DE CAJA DE VÁLVULA
RAP SUMINISTRO E INSTALACIÓN DE CAJAS DE CONCRETO PREFABRICADAS und 0.00% 0.80 14.00 14.00 0.00 0.00
###
RAP CARPINTERIA METALICA ###
RAP SUMINISTRO E INSTALACIÓN DE REJILLA DE SOPORTE EN POZOS DE LA RED DE AGUA PO und 0.00% 10.50 84.00 84.00 0.00 0.00
###
RAP DISCIPLINA: INSTALACIONES SANITARIAS ###
RAP TUBERIAS ###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
RAP 975-DWU-4"-P0E03U-10001
RAP PIPE. PE D3350, PE, SDR 11 ø4" m 90.00% 0.71 138.00 138.00 124.00 124.00
###
RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø4" pza 90.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Te, PE, PE D3350 ø4" und 90.00% 0.00 0.00 0.00 0.00 0.00
###
RAP El, 90Deg, PE, PE D3350 ø4" und 90.00% 0.00 0.00 0.00 0.00 0.00
###
RAP RedCon, PE, PE D3350 ø6" a ø4" (Conexión a red existente) und 90.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE, Ø4" und 90.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF. ø4" und 90.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø4" und 90.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø3/4" pza 90.00% 0.00 0.00 0.00 0.00 0.00
###
RAP RED DE AGUA POTABLE-TUBERIA EN CISTERNA
RAP Pipe. A53-B-E. ERW, Std Wt, BBE ø2" m 0.00% 17.00 136.00 136.00 0.00 0.00
###
RAP Vlv-Chk, Poppet, B62, CL125, FNPT, BrzTrm ø2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO ø2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP El, 90Deg, FNPT, A197, CL300 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Te, FNPT, A197, CL300 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP UNIÓN UNIVERSAL INOX.C.304 C/Rx150Lb, Ø2"
 und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP VÁLVULA DE RETENCIÓN DE PIE INOX Ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Nipple,TBEM.A106-B,XS,3" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-2"-M1E0HU-100013
RAP Pipe. PE D3350, PE, SDR 11 ø2" m 30.00% 1.89 83.00 83.00 25.00 25.00
###
RAP Te, PE, PE D3550 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP El, 90Deg, PE, PE D3350 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP RedCon, PE, PE D3350 ø2" a ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-1"-M1E0HU-100014
RAP Pipe. PE D3350, PE, SDR 11 ø1" m 0.00% 6.41 64.00 64.00 0.00 0.00
###
RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø1" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Te, PE, PE D3350 ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP El, 90Deg, PE, PE D3350 ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE., ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF., ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DW-1"-G1E0V-100015
RAP Pipe, A53-B-S, SMLS, Sch 80, T&C ø1" m 0.00% 3.73 11.00 11.00 0.00 0.00
###
RAP El, 90Deg, FNPT, A197, CL300 ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgThd. A105. CL150. FF. StdF. B16.5. ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DW-1"-G1E0V-100016
RAP Pipe, A53-B-S, SMLS, Sch 80, T&C ø1" m 0.00% 16.67 50.00 50.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
RAP Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO ø1" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Te, FNPT. A197, CL300, ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP El, 90Deg, FNPT, A197, CL300 ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgThd. A105. CL150. FF. StdF. B16.5. ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Nipple, TBEM, A106-B, XS, 3in., ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-1"-M1E0HU-100017
RAP Pipe. PE D3350, PE, SDR 11 ø1" m 30.00% 1.56 41.00 41.00 12.00 12.00
###
RAP Te, PE, PE D3350 ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP RedCon, PE, PE D3350 ø1" a ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-3/4"-M1E0HU-100018
RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 30.00% 1.74 33.00 33.00 10.00 10.00
###
RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DW-3/4"-G1E0V-100019 / 100027 / 100029 / 100035 / 100039 / 100042 / 100072 & 100085
RAP Pipe, A53-B-S, SMLS, Sch 80, T&C ø3/4" m 0.00% 18.31 220.00 220.00 0.00 0.00
###
RAP Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO ø3/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP El, 90Deg, FNPT, A197, CL300 ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Nipple, TBEM, A106-B, XS, 7in ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Nipple, TBEM, A106-B, XS, 3in., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgThd. A105. CL150. FF. StdF. B16.5. ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP BanjoLevaAdt. MaleThread. STAINLESS STEEL, 150PSI., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-3/4"-M1E0HU-100025
RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 30.00% 0.89 50.00 50.00 15.00 15.00
###
RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-3/4"-M1E0HU-100026
RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 0.00% 16.45 33.00 33.00 0.00 0.00
###
RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-2"-M1E0HU-100033
RAP Pipe. PE D3350, PE, SDR 11 ø2" m 90.00% 1.25 146.00 146.00 131.00 131.00
###
RAP Te, PE, PE D3550 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP El, 90Deg, PE, PE D3350 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP RedCon, PE, PE D3350 ø2" a ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP RedCon, PE, PE D3350 ø2" a ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP RedCon, PE, PE D3350 ø2" a ø 3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE., ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF., ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø3/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-3/4"-M1E0HU-100034
RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 85.71% 9.78 29.00 29.00 25.00 25.00
###
RAP El, 90Deg, PE, PE D3350 ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-1"-M1E0HU-100037
RAP Pipe. PE D3350, PE, SDR 11 ø1" m 30.00% 1.93 87.00 87.00 26.00 26.00
###
RAP Te, PE, PE D3350 ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP El, 90Deg, PE, PE D3350 ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP RedCon, PE, PE D3350 ø1" a ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø1" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE., ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF., ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-3/4"-M1E0HU-100038
RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 30.00% 1.61 45.00 45.00 14.00 14.00
###
RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-3/4"-M1E0HU-100041
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 0.00% 11.00 33.00 33.00 0.00 0.00
###
RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-3/4"-M1E0HU-100044
RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 30.00% 4.43 84.00 84.00 25.00 25.00
###
RAP Te, PE, PE D3350 ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP El, 90Deg, PE, PE D3350 ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP RedCon, PE, PE D3350 ø3/4" a ø 1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DW-3/4"-G1E0V-100045 / 975-DW-3/4"-G1E0V-100046
RAP Pipe, A53-B-S, SMLS, Sch 80, T&C ø3/4" m 0.00% 31.50 63.00 63.00 0.00 0.00
###
RAP Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO,ø3/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP El, 90Deg, FNPT, A197, CL300, ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Nipple, TBEM, A106-B, XS, 7in ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Nipple, TBEM, A106-B, XS, 3in., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgThd. A105. CL150. FF. StdF. B16.5. ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP BanjoLevaAdt. MaleThread. STAINLESS STEEL, 150PSI., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-1/2"-M1E0HU-100049
RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 0.00% 3.45 48.00 48.00 0.00 0.00
###
RAP Te, PE, PE D3350 ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP El, 90Deg, PE, PE D3350 ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DW-1/2"-G1E0V-100050 / 975-DW-1/2"-G1E0V-100053
RAP Pipe, A53-B-S, SMLS, StdWt, T&C,ø1/2" m 0.00% 31.55 63.00 63.00 0.00 0.00
###
RAP Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO,ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP El, 90Deg, FNPT, A197, CL300, ø1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Nipple, TBEM, A106-B, XS, 7in., ø1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
RAP Nipple, TBEM, A106-B, XS, 3in., ø1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgThd. A105. CL150. FF. StdF. B16.5., ø1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP BanjoLevaAdt. MaleThread. STAINLESS STEEL, 150PSI., ø1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-1 1/4"-M1E0HU-100065
RAP Pipe. PE D3350, PE, SDR 11 ø1 1/4" m 0.00% 9.11 64.00 64.00 0.00 0.00
###
RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø1 1/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Te, PE, PE D3350 ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP El, 90Deg, PE, PE D3350, ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE., ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF., ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DW-1 1/4"-G1E0V-100066 / 975-DW-1 1/4"-G1E0V-100068
RAP Pipe, A53-B-S, SMLS, StdWt, T&C,ø1 1/4" m 0.00% 65.21 65.00 65.00 0.00 0.00
###
RAP Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO,ø1 1/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP El, 90Deg, FNPT, A197, CL300, ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Nipple, TBEM, A106-B, XS, 7in., ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Nipple, TBEM, A106-B, XS, 3in., ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgThd. A105. CL150. FF. StdF. B16.5., ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP BanjoLevaAdt. MaleThread. STAINLESS STEEL, 150PSI., ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-3/4"-M1E0HU-100071
RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 0.00% 10.33 31.00 31.00 0.00 0.00
###
RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-1 1/4"-M1E0HU-100080
RAP Pipe. PE D3350, PE, SDR 11 ø1 1/4" m 0.00% 16.58 33.00 33.00 0.00 0.00
###
RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø1 1/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE., ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF., ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DW-1 1/4"-G1E0V-100081
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
RAP Pipe, A53-B-S, SMLS, StdWt, T&C,ø1 1/4" m 0.00% 9.85 20.00 20.00 0.00 0.00
###
RAP El, 90Deg, FNPT, A197, CL300, ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgThd. A105. CL150. FF. StdF. B16.5., ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-1"-M1E0HU-100083
RAP Pipe. PE D3350, PE, SDR 11 ø1" m 30.00% 2.47 74.00 74.00 22.00 22.00
###
RAP Te, PE, PE D3350 ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP El, 90Deg, PE, PE D3350 ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP RedCon, PE, PE D3350 ø1" a ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø1" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE., ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF., ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø1" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DWU-3/4"-M1E0HU-100084
RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 0.00% 11.00 33.00 33.00 0.00 0.00
###
RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP 975-DW-1"-G1E0V-100087
RAP Pipe, A53-B-S, SMLS, StdWt, T&C,ø1/2" m 0.00% 34.00 34.00 34.00 0.00 0.00
###
RAP Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO,ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP El, 90Deg, FNPT, A197, CL300, ø1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Nipple, TBEM, A106-B, XS, 7in., ø1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Nipple, TBEM, A106-B, XS, 3in., ø1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP FlgThd. A105. CL150. FF. StdF. B16.5., ø1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP BanjoLevaAdt. MaleThread. STAINLESS STEEL, 150PSI., ø1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAP MODIFICACIONES EN LA LÍNEA DE AGUA POTABLE EXISTENTE
RAP Pipe, PE D3350, PE, SDR 11 ø8" m 0.00% 0.76 153.00 153.00 0.00 0.00
###
RAP SOPORTERIA ###
RAP GA-GS6-1", Tubería 975-DW-1"-G1E0V-100015 & 100016 pza 0.00% 63.75 255.00 255.00 0.00 0.00
###
RAP GA-GS6-1/2", Tubería 975-DW-3/4"-G1E0V-100045 / 100046 / 100050 / 100053 & 100087 pza 0.00% 51.00 255.00 255.00 0.00 0.00
###
RAP PINTURA ###
RAP PINTURA DE TUBERIAS m2 0.00% 15.73 47.00 47.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
RAN RED DE AGUAS NEGRAS ###
RAN DISCIPLINA: CIVIL ###
RAN MOVIMIENTO DE TIERRAS PARA TUBERÍAS, BUZONES - RED DE AGUAS NEGRAS ###
RAN EXCAVACION PARA BUZONES m3 88.89% 1.53 14.00 14.00 12.00 12.00
###
RAN EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 97.78% 1.45 238.00 238.00 233.00 233.00
###
RAN EXCAVACION PARA CAJAS DE REGISTRO m3 73.98% 6.20 12.00 12.00 9.00 9.00
###
RAN REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 83.13% 0.13 74.00 74.00 62.00 62.00
###
RAN TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= 1 KM m3 -KM 83.42% 0.16 3.00 3.00 3.00 3.00
###
RAN TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM (Hasta 6.8 KM Ref.m3 -KM 76.04% 0.04 4.00 4.00 3.00 3.00
###
RAN COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 70.26% 3.42 55.00 55.00 38.00 38.00
###
RAN TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 72.60% 0.16 13.00 13.00 10.00 10.00
###
RAN TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KM Ref.) m3 -KM 70.81% 0.04 18.00 18.00 13.00 13.00
###
RAN RELLENO CON MATERIAL 2B DE PRESTAMO m3 90.52% 1.78 117.00 117.00 106.00 106.00
###
RAN RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 92.95% 2.03 176.00 176.00 164.00 164.00
###
RAN ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 71.64% 0.11 12.00 12.00 9.00 9.00
###
RAN ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 70.81% 0.05 10.00 10.00 7.00 7.00
###
RAN APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 80.23% 0.23 25.00 25.00 20.00 20.00
###
RAN CONCRETO SIMPLE PARA BUZONES DE AGUAS NEGRAS ###
RAN COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 0.00% 6.18 6.00 6.00 0.00 0.00
###
RAN COLOCACIÓN DE CONCRETO F'c=10 MPa PARA DADO m3 0.00% 6.18 6.00 6.00 0.00 0.00
###
RAN CONCRETO ARMADO PARA CAJAS DE REGISTRO
RAN INSTALACION DE CAJAS DE REGISTRO DE 12"x24" und 0.00% 20.50 62.00 62.00 0.00 0.00
###
RAN INSTALACION DE CAJAS DE REGISTRO DE 4" und 0.00% 20.50 21.00 21.00 0.00 0.00
###
RAN CONCRETO ARMADO PARA BUZONES
RAN COLOCACIÓN DE CONCRETO F'c=20 MPa m3 0.00% 6.18 43.00 43.00 0.00 0.00
###
RAN ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 2.47 69.00 69.00 0.00 0.00
###
RAN SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 41.00 41.00 0.00 0.00
###
RAN CURADO DE CONCRETO CON ADITIVO
RAN CURADO DE CONCRETO CON ANTISOL m2 0.00% 0.14 4.00 4.00 0.00 0.00
###
RAN CARPINTERIA METALICA ###
RAN SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA F°G° CON PLANCHA ESTRIADA DE 730x730 und 0.00% 1.50 5.00 5.00 0.00 0.00
###
RAN DISCIPLINA: INSTALACIONES SANITARIAS ###
RAN TUBERIAS ###
RAN RED DE AGUAS NEGRAS-TUBERIA EN CISTERNA
RAN PIPE, PVC-D3034, BELL, SDR 35 Ø2" m 0.00% 0.83 3.00 3.00 0.00 0.00
###
RAN 975-WSU-4"-P0E03U-10001
RAN PIPE, PVC-D3034, BELL, SDR 35 Ø4" m 30.00% 0.79 50.00 50.00 15.00 15.00
###
RAN PIPE, PVC-D3034, BELL, SDR 35 Ø2" m 30.00% 0.69 6.00 6.00 2.00 2.00
###
RAN El, 45Deg, Bell, Bell, PVC-D3034 ø4" und 30.00% 0.00 0.00 0.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
RAN EL, 90DEG, BELL. BELL, PVC-D3034 Ø4" und 30.00% 0.00 0.00 0.00 0.00 0.00
###
RAN EL, 90DEG, BELL. BELL, PVC-D3034 Ø2" und 30.00% 0.00 0.00 0.00 0.00 0.00
###
RAN RedTe, Bell, Bell, PVC-D3034 ø4" pza 30.00% 0.00 0.00 0.00 0.00 0.00
###
RAN 975-PWU-2"-MDEOHU-100018
RAN Pipe, PE D3350, PE, SDR 15.5 ø2" m 0.00% 2.50 10.00 10.00 0.00 0.00
###
RAN El, 45Deg, PE, PE D3350 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAN 975-MDW-6"-MCE0HU-10005 / 10006 & 10007
RAN Pipe, PE D3350, PE, SDR 21 ø6" m 16.79% 0.46 65.00 65.00 11.00 11.00
###
RAG RED DE AGUAS GRISES ###
RAG DISCIPLINA: CIVIL ###
RAG MOVIMIENTO DE TIERRAS PARA TUBERÍAS, BUZONES - RED DE AGUAS GRISES ###
RAG EXCAVACION PARA BUZONES m3 95.57% 1.53 92.00 92.00 87.00 87.00
###
RAG EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 94.32% 1.45 1,653.00 1,653.00 1,559.00 1,559.00
###
RAG EXCAVACION PARA CAJAS DE REGISTRO Y DESARENADOR m3 89.61% 6.20 93.00 93.00 83.00 83.00
###
RAG REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 90.13% 0.13 313.00 313.00 282.00 282.00
###
RAG TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= 1 KM m3 -KM 89.62% 0.16 18.00 18.00 17.00 17.00
###
RAG TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM (Hasta 6.8 KM Ref.m3 -KM 86.04% 0.04 25.00 25.00 22.00 22.00
###
RAG COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 82.68% 3.42 311.00 311.00 257.00 257.00
###
RAG TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 82.69% 0.16 54.00 54.00 44.00 44.00
###
RAG TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KM Ref.) m3 -KM 82.68% 0.04 74.00 74.00 61.00 61.00
###
RAG RELLENO CON MATERIAL 2B DE PRESTAMO m3 84.72% 1.78 474.00 474.00 402.00 402.00
###
RAG RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 84.24% 2.03 632.00 632.00 532.00 532.00
###
RAG ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 85.28% 0.11 129.00 129.00 110.00 110.00
###
RAG ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 85.28% 0.05 105.00 105.00 90.00 90.00
###
RAG APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 87.41% 0.23 264.00 264.00 231.00 231.00
###
RAG MOVIMIENTO DE TIERRAS PARA FOSA DE RETENCIÓN DE DERRAMES
RAG EXCAVACIÓN P/ESTRUCTURAS m3 100.00% 6.20 68.00 68.00 68.00 68.00
###
RAG REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.13 4.00 4.00 4.00 4.00
###
RAG TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.16 0.00 0.00 0.00 0.00
###
RAG TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 100.00% 0.04 0.00 0.00 0.00 0.00
###
RAG MEJORAMIENTO CON MATERIAL GRANULAR m3 100.00% 0.62 1.00 1.00 1.00 1.00
###
RAG ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.11 2.00 2.00 2.00 2.00
###
RAG ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.05 1.00 1.00 1.00 1.00
###
RAG APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.23 3.00 3.00 3.00 3.00
###
RAG CONCRETO SIMPLE ###
RAG COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 75.00% 6.18 25.00 25.00 19.00 19.00
###
RAG CONCRETO ARMADO PARA CAJAS DE REGISTRO Y DESARENADOR
RAG INSTALACION DE CAJAS 30"x30" und 75.00% 20.50 103.00 103.00 77.00 77.00
###
RAG INSTALACION DE CAJAS 20"x20" und 75.00% 20.50 123.00 123.00 92.00 92.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
RAG INSTALACION DE CAJA 12"x24" und 75.00% 20.50 62.00 62.00 46.00 46.00
###
RAG INSTALACION DE DESARENADOR 1m x 1m und 75.00% 20.50 21.00 21.00 15.00 15.00
###
RAG CONCRETO ARMADO PARA BUZONES
RAG COLOCACIÓN DE CONCRETO F'c=20 MPa m3 0.00% 6.18 216.00 216.00 0.00 0.00
###
RAG ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 2.47 497.00 497.00 0.00 0.00
###
RAG SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 21.43% 0.12 191.00 191.00 41.00 41.00
###
RAG CONCRETO ARMADO PARA FOSA DE RETENCIÓN DE DERRAMES
RAG LOSAS
RAG COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 17.00 17.00 17.00 17.00
###
RAG ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 2.47 5.00 5.00 5.00 5.00
###
RAG SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 28.00 28.00 28.00 28.00
###
RAG MUROS
RAG COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 17.00 17.00 17.00 17.00
###
RAG ENCOFRADO CARAVISTA Y DESENCOFRADO DE MURO m2 100.00% 3.50 49.00 49.00 49.00 49.00
###
RAG SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 59.00 59.00 59.00 59.00
###
RAG CURADO DE CONCRETO CON ADITIVO
RAG CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.14 31.00 31.00 31.00 31.00
###
RAG TARREJEOS, DERRAMES Y VESTIDURAS
RAG TARRAJEO CON IMPERMEABILIZANTE m2 100.00% 1.85 33.00 33.00 33.00 33.00
###
RAG CARPINTERIA METALICA ###
RAG SUMINISTRO E INSTALACION DE TAPA METALICA 0.60m x 0.60m INC. ACCESORIOS und 100.00% 1.50 2.00 2.00 2.00 2.00
###
RAG SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 1.58m x 1.35m INC. ACCESORIOS und 100.00% 6.75 7.00 7.00 7.00 7.00
###
RAG SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA F°G° CON PLANCHA ESTRIADA DE 730x730 und 100.00% 1.50 21.00 21.00 21.00 21.00
###
RAG DISCIPLINA: INSTALACIONES SANITARIAS ###
RAG TUBERIAS ###
RAG 975-PWU-4"-MDE0HU-100021
RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 30.00% 1.32 23.00 23.00 7.00 7.00
###
RAG El, 45Deg, PE, PE D3350 ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PWU-4"-MDE0HU-100022
RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 0.00% 1.50 8.00 8.00 0.00 0.00
###
RAG 975-PWU-4"-MDE0HU-100023
RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 0.00% 0.48 10.00 10.00 0.00 0.00
###
RAG 975-PWU-4"-MDE0HU-100024
RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 0.00% 0.75 8.00 8.00 0.00 0.00
###
RAG 975-PWU-2"-MDE0HU-100028
RAG Pipe, PE D3350, PE, SDR 15.5 ø2" m 0.00% 10.00 20.00 20.00 0.00 0.00
###
RAG El, 90Deg, PE, PE D3350 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PWU-4"-MDE0HU-100031
RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 0.00% 0.88 7.00 7.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
RAG 975-PWU-2"-MDE0HU-100030
RAG Pipe, PE D3350, PE, SDR 15.5 ø2" m 30.00% 6.67 20.00 20.00 6.00 6.00
###
RAG El, 90Deg, PE, PE D3350 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PWU-4"-MDE0HU-100032
RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 30.00% 1.47 22.00 22.00 7.00 7.00
###
RAG YEE, PE, PE D3350 ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PWU-2"-MDE0HU-100036
RAG Pipe, PE D3350, PE, SDR 15.5 ø2" m 30.00% 1.18 31.00 31.00 9.00 9.00
###
RAG YEE, PE, PE D3350 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG El, 90Deg, PE, PE D3350 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PWU-2"-MDE0HU-100040
RAG Pipe, PE D3350, PE, SDR 15.5 ø2" m 0.00% 10.00 20.00 20.00 0.00 0.00
###
RAG El, 90Deg, PE, PE D3350 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PWU-2"-MDE0HU-100043
RAG Pipe, PE D3350, PE, SDR 15.5 ø2" m 30.00% 1.10 21.00 21.00 6.00 6.00
###
RAG El, 90Deg, PE, PE D3350 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PWU-4"-MDE0HU-100048 / 100052 & 100055
RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 0.00% 1.88 8.00 8.00 0.00 0.00
###
RAG 975-PWU-4"-MDE0HU-100056
RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 0.00% 0.94 8.00 8.00 0.00 0.00
###
RAG 975-PWU-4"-MDE0HU-100057
RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 0.00% 1.07 8.00 8.00 0.00 0.00
###
RAG 975-PWU-4"-MDE0HU-100058
RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 0.00% 2.61 18.00 18.00 0.00 0.00
###
RAG YEE, PE, PE D3350 ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PWU-6"-MDE0HU-100059
RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.00% 0.94 8.00 8.00 0.00 0.00
###
RAG 975-PWU-6"-MDE0HU-100060
RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.00% 1.50 8.00 8.00 0.00 0.00
###
RAG 975-PWU-6"-MDE0HU-100061
RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 0.44 12.00 12.00 3.00 3.00
###
RAG 975-PWU-6"-MDE0HU-100062
RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 0.44 8.00 8.00 2.00 2.00
###
RAG 975-PWU-4"-MDE0HU-100063
RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 0.00% 3.60 7.00 7.00 0.00 0.00
###
RAG 975-PWU-6"-MDE0HU-100064
RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 1.00 20.00 20.00 6.00 6.00
###
RAG YEE, PE, PE D3350 ø6" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PWU-6"-MDE0HU-100070
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 5.03 40.00 40.00 12.00 12.00
###
RAG El, 90Deg, PE, PE D3350 ø6" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PWU-2"-MDE0HU-100073
RAG Pipe, PE D3350, PE, SDR 15.5 ø2" m 0.00% 1.78 16.00 16.00 0.00 0.00
###
RAG El, 90Deg, PE, PE D3350 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PWU-6"-MDE0HU-100074
RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.00% 2.38 14.00 14.00 0.00 0.00
###
RAG FlgAdt, PE D3350, PE, 6"Ø und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG FlgBkg, A536, CL150, FF, 6"Ø und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PWU-1 1/2"-MDE0HU-100082
RAG Pipe, PE D3350, PE, SDR 15.5 ø1 1/2" m 0.00% 1.18 11.00 11.00 0.00 0.00
###
RAG El, 45Deg, PE, PE D3350 ø1 1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PWU-2"-MDE0HU-100086
RAG SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE CORRUGADA Y PERFORADA ø2" m 30.00% 0.50 6.00 6.00 2.00 2.00
###
RAG YEE con Reducción ø2" a ø1 1/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PWU-2"-MDE0HU-100088
RAG Pipe, PE D3350, PE, SDR 15.5 ø2" m 0.00% 25.50 26.00 26.00 0.00 0.00
###
RAG El, 90Deg, PE, PE D3350 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG FlgAdt, PE D3350, PE., ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG FlgBkg, A536, CL 150,FF., ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG FlgThd. A105. CL150. FF. StdF. B16.5., ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG Nipple, TBEM, A106-B, XS, 3in., ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-SD-4"-M0E03U-100089
RAG SUMINISTRO E INSTALACION DE TUBERIA HDPE CORRUGADA Y PERFORADA 4" m 0.00% 0.67 22.00 22.00 0.00 0.00
###
RAG 45Deg, HDPE CORRUGADO ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PWU-6"-MDE0HU-100090
RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.00% 1.80 7.00 7.00 0.00 0.00
###
RAG 975-PWU-6"-MDE0HU-100091
RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 0.43 8.00 8.00 2.00 2.00
###
RAG 975-PWU-6"-MDE0HU-100092
RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 0.45 7.00 7.00 2.00 2.00
###
RAG 975-PWU-6"-MDE0HU-100093
RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.00% 1.06 7.00 7.00 0.00 0.00
###
RAG 975-PWU-6"-MDE0HU-100094
RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.00% 0.93 14.00 14.00 0.00 0.00
###
RAG El, 45Deg, PE, PE D3350 ø6" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PWU-6"-MDE0HU-100095
RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.00% 1.04 7.00 7.00 0.00 0.00
###
RAG 975-PWU-6"-MDE0HU-100096
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 0.46 10.00 10.00 3.00 3.00
###
RAG 975-PWU-6"-MDE0HU-100097
RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 0.45 15.00 15.00 5.00 5.00
###
RAG 975-PWU-6"-MDE0HU-100098 / 100099 / 1000100 / 1000101 / 1000102 / 1000103 / 1000104 / 1000105 / 1000106 / 1000107 / 1000108 / 1000109 & 1000111
RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 0.38 152.00 152.00 46.00 46.00
###
RAG RED DE AGUAS GRISES - FOSA DE RETENCIÓN DE DERRAMES
RAG Pipe, PE D3350, PE, SDR 21 ø6" m 100.00% 18.00 54.00 54.00 54.00 54.00
###
RAG Pipe, A53-B-S, SMLS, StdWt, T&C, ø2" m 100.00% 18.00 18.00 18.00 18.00 18.00
###
RAG FlgBlnd, A105, CL150, FF, StdF, B16.5 ø6" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG Te, BW, A234-WPB, StdWt ø6" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG FlgAdt, PE D3350, PE, 6"Ø und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG FlgBkg, A536, CL150, FF, 6"Ø und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5 ø6" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG StdBlt, A193B7/2H Nut, A194-2H, HvyHex, B18.2.2 und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG Vlv-Chk, WfrTyp, A126B, CL125, FF, StdF, A1BrzSSBuna, 2"Ø, Con canastilla pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG Vlv-Bfly, WfrTyp, A216WCB, CL150, API 609B, BunaNTrim ø6" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PW-4"-C1E2A-100047 / 100051 & 100054
RAG Pipe, A53-B-E, ERW, Std Wt, BBE ø4" m 0.00% 16.31 65.00 65.00 0.00 0.00
###
RAG SO FIg, A105, CL150, FF, StdF, B16.5 ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG El, 90Deg, LR, BW A234-WPB, StdWt ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø3/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG 975-PW-6"-C1E2A-100067 & 100069
RAG Pipe, A53-B-E, ERW, Std Wt, BBE ø6" m 0.00% 30.75 92.00 92.00 0.00 0.00
###
RAG SO FIg, A105, CL150, FF, StdF, B16.5 ø6" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG El, 90Deg, LR, BW A234-WPB, StdWt ø6" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø6" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø3/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
RAG SOPORTERIA ###
RAG GA-GS13-4", TUBERÍAS 975-PW-4"-C1E2A-100047 / 100051 & 100054 pza 0.00% 50.00 300.00 300.00 0.00 0.00
###
RAG A-PT3-2, TUBERÍAS 975-PW-4"-C1E2A-100047 / 100051 & 100054 pza 0.00% 50.00 300.00 300.00 0.00 0.00
###
RAG GA-GS13-6", TUBERÍAS 975-PW-6"-C1E2A-100067 & 100069 pza 0.00% 75.00 300.00 300.00 0.00 0.00
###
RAG A-PT3-2, TUBERÍAS 975-PW-6"-C1E2A-100067 & 100069 pza 0.00% 75.00 300.00 300.00 0.00 0.00
###
RAG PINTURA ###
RAG PINTURA DE TUBERIAS m2 0.00% 5.33 16.00 16.00 0.00 0.00
###
MODULO A: ALMACÉN DE COMPOSTAJE ###
A - DISCIPLINA: CIVIL ###
A MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS ###
A C2000 EXCAVACION P/ZAPATAS m3 100.00% 1.53 66.00 243.00 66.00 243.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
A C2000 EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 0.00% 6.20 143.00 189.00 0.00 0.00
###
A C5720 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.13 20.00 79.00 20.00 79.00
###
A C5720 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.16 1.00 29.00 1.00 29.00
###
A C5720 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 100.00% 0.04 1.00 20.00 1.00 20.00
###
A C5720 RELLENO ESTRUCTURAL CON MATERIAL PROPIO SELECCIONADO m3 100.00% 1.78 32.00 179.00 32.00 179.00
###
A C5720 MEJORAMIENTO CON MATERIAL GRANULAR m3 100.00% 0.62 3.00 11.00 3.00 11.00
###
A C5720 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.11 7.00 28.00 7.00 28.00
###
A C5720 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.05 5.00 35.00 5.00 35.00
###
A C5720 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.23 14.00 58.00 14.00 58.00
###
SE600KVA CONCRETO SIMPLE ###
A CONCRETO SIMPLE PARA ZAPATAS
A C5700 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 6.18 19.00 55.00 19.00 55.00
###
A CONCRETO SIMPLE PARA LOSAS DE EQUIPOS
A C5730 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 29.00 29.00 0.00 0.00
###
A C5730 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSAS PARA EQUIPOS m2 0.00% 2.47 10.00 10.00 0.00 0.00
###
A CURADO DE CONCRETO CON ADITIVO
A C5730 CURADO DE CONCRETO CON ANTISOL m2 0.00% 0.14 6.00 6.00 0.00 0.00
###
RDBT CONCRETO ARMADO ###
A ZAPATAS
A C5700 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 187.00 91.00 187.00 91.00
###
A C5700 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 54.00 57.00 54.00 57.00
###
A PEDESTAL
A C5700 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 29.00 37.00 29.00 37.00
###
A C5700 ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 100.00% 2.63 116.00 138.00 116.00 138.00
###
A C5700 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 73.00 87.00 73.00 87.00
###
A LOSA
A C5730 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 484.00 484.00 0.00 0.00
###
A C5730 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 0.00% 2.47 82.00 82.00 0.00 0.00
###
A C5730 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 357.00 357.00 0.00 0.00
###
A POZO SUMIDERO
A C5730 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 6.00 6.00 0.00 0.00
###
A C5730 ENCOFRADO CARAVISTA Y DESENCOFRADO DE POZO SUMIDERO m2 0.00% 2.47 7.00 7.00 0.00 0.00
###
A C5730 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 6.00 6.00 0.00 0.00
###
A VEREDA
A C5730 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 29.00 29.00 0.00 0.00
###
A C5730 ENCOFRADO CARAVISTA Y DESENCOFRADO DE VEREDA m2 0.00% 2.47 25.00 25.00 0.00 0.00
###
A C5730 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 13.00 13.00 0.00 0.00
###
A RAMPA
A C5730 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 29.00 29.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
A C5730 ENCOFRADO CARAVISTA Y DESENCOFRADO DE RAMPA m2 0.00% 2.47 10.00 10.00 0.00 0.00
###
A C5730 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 20.00 20.00 0.00 0.00
###
A CANAL DE DRENAJE
A C5730 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 52.00 52.00 0.00 0.00
###
A C5730 ENCOFRADO CARAVISTA Y DESENCOFRADO DE CANAL DE DRENAJE m2 0.00% 2.80 59.00 59.00 0.00 0.00
###
A C5730 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 77.00 77.00 0.00 0.00
###
A SARDINEL
A C5730 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 111.00 111.00 0.00 0.00
###
A C5730 ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 0.00% 2.47 173.00 173.00 0.00 0.00
###
A C5730 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 44.00 44.00 0.00 0.00
###
A CURADO DE CONCRETO CON ADITIVO
A C5730 CURADO DE CONCRETO CON ANTISOL m2 80.00% 0.14 89.00 18.00 71.00 14.00
###
A SELLADO DE JUNTAS
A C5730 SELLADO DE JUNTA TIPO 1 m 0.00% 0.70 27.00 27.00 0.00 0.00
###
A C5730 SELLADO DE JUNTA TIPO 2 m 0.00% 0.70 100.00 100.00 0.00 0.00
###
A C5730 SELLADO DE JUNTA TIPO 3 m 0.00% 0.70 4.00 4.00 0.00 0.00
###
A C5730 JUNTA TIPICA EN PEDESTAL m 0.00% 0.53 15.00 15.00 0.00 0.00
###
A TARREJEOS, DERRAMES Y VESTIDURAS
A C5730 TARRAJEO CON IMPERMEABILIZANTES P/POZO SUM. m2 0.00% 1.85 6.00 6.00 0.00 0.00
###
A BRUÑAS
A C5730 BRUÑADO EN RAMPA m2 0.00% 0.62 21.00 21.00 0.00 0.00
###
A APLICACIÓN DE GROUT E IMPERMEABILIZANTE
A C5760 GROUT PARA PEDESTAL E=2.5CM m2 0.00% 10.94 33.00 33.00 0.00 0.00
###
A CARPINTERIA METALICA ###
A C5770 SUMINISTRO E INSTALACIÓN DE PUERTA CORREDIZA P01 INC. RIEL SUP. Y ACCESORIOS und 0.00% 52.00 104.00 104.00 0.00 0.00
###
A C5770 SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.25m m 0.00% 1.36 48.00 48.00 0.00 0.00
###
A C5770 SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.275m m 0.00% 1.43 4.00 4.00 0.00 0.00
###
A C5770 SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.575m m 0.00% 3.67 11.00 11.00 0.00 0.00
###
A ESTRUCTURAS METÁLICAS ###
A MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS ###
A C5760 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS
A C5760 ACERO ESTRUCTURAL PERFIL W 8x31 lb/ft kg 100.00% 0.06 247.00 247.00 247.00 247.00
###
A C5760 ACERO ESTRUCTURAL TUBO 3"x3"x3 kg 100.00% 0.09 3.00 3.00 3.00 3.00
###
A C5760 ACERO ESTRUCTURAL PLANCHA 5/8" kg 100.00% 0.05 9.00 9.00 9.00 9.00
###
A C5760 ACERO ESTRUCTURAL PLANCHA 1/2" kg 100.00% 0.06 2.00 2.00 2.00 2.00
###
A C5760 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES
A C5760 ACERO ESTRUCTURAL TUBO 4"x4"x7.9mm kg 100.00% 0.06 13.00 13.00 13.00 13.00
###
A C5760 ACERO ESTRUCTURAL PERFIL C 6"x2"x1/8" kg 100.00% 0.09 35.00 35.00 35.00 35.00
###
A C5760 ACERO ESTRUCTURAL ANGULO 5"x5"x3/8" kg 100.00% 0.09 8.00 8.00 8.00 8.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
A C5760 ACERO ESTRUCTURAL ANGULO 1"x1"x3/16" kg 100.00% 0.12 0.00 0.00 0.00 0.00
###
A C5760 ACERO ESTRUCTURAL PLANCHA 5/8" kg 100.00% 0.05 5.00 5.00 5.00 5.00
###
A C5760 ACERO ESTRUCTURAL PLANCHA 1/2" kg 100.00% 0.06 21.00 21.00 21.00 21.00
###
A C5760 ACERO ESTRUCTURAL PLANCHA 1/4" kg 100.00% 0.05 1.00 1.00 1.00 1.00
###
A C5760 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE
A C5760 ACERO ESTRUCTURAL PERFIL W6x16 lb/ft kg 100.00% 0.06 111.00 111.00 111.00 111.00
###
A C5760 ACERO ESTRUCTURAL PERFIL W6x9 lb/ft kg 100.00% 0.08 171.00 171.00 171.00 171.00
###
A C5760 ACERO ESTRUCTURAL PLANCHA 1" kg 100.00% 0.05 25.00 25.00 25.00 25.00
###
A C5760 ACERO ESTRUCTURAL PLANCHA 5/8" kg 100.00% 0.05 73.00 73.00 73.00 73.00
###
A C5760 ACERO ESTRUCTURAL PLANCHA 1/4" kg 100.00% 0.05 2.00 2.00 2.00 2.00
###
A C5760 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS
A C5760 ACERO ESTRUCTURAL PERFIL C 6"x2"x1/8" kg 100.00% 0.09 282.00 282.00 282.00 282.00
###
A C5760 ACERO ESTRUCTURAL ANGULO 5"x3/8" kg 100.00% 0.09 24.00 24.00 24.00 24.00
###
A C5760 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES
A C5760 ACERO ESTRUCTURAL FIERRO LISO Ø1" kg 100.00% 0.11 27.00 27.00 27.00 27.00
###
A C5760 ACERO ESTRUCTURAL FIERRO LISO Ø5/8" kg 100.00% 0.11 38.00 38.00 38.00 38.00
###
A C5760 SUMINISTRO, INSTALACIÓN DE COBERTURA
A C5760 SUMINISTRO, INSTALACIÓN COBERTURA TR-4 TRANSLUCIDO m2 100.00% 0.43 187.00 187.00 187.00 187.00
###
A C5760 SUMINISTRO, INSTALACIÓN DE CERRAMIENTO
A C5760 SUMINISTRO, INSTALACIÓN CERRAMIENTO TR-4 m2 70.00% 0.43 95.00 95.00 66.00 66.00
###
A C5760 INSTALACIÓN PLANCHA DE PANEL TR-4 TRASLUCIDO m2 0.00% 0.43 92.00 92.00 0.00 0.00
###
A C5760 SUMINISTRO, INSTALACIÓN DE CUMBRERA
A C5760 SUMINISTRO, INSTALACIÓN DE CUMBRERA TR-4 m 57.65% 0.17 6.00 6.00 4.00 4.00
###
A C5760 SUMINISTRO, INSTALACIÓN DE ESQUINEROS
A C5760 SUMINISTRO, INSTALACIÓN ESQUINEROS TR-4 m 57.65% 0.17 4.00 4.00 2.00 2.00
###
A C5760 SUMINISTRO, INSTALACIÓN REMATES
A C5760 SUMINISTRO, INSTALACIÓN REMATES TR-4 m 65.28% 0.17 4.00 4.00 2.00 2.00
###
A C5760 INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE
A C5760 ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=3/4" kg 100.00% 0.18 18.00 18.00 18.00 18.00
###
A INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
A C5760 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 100.00% 0.09 71.00 71.00 71.00 71.00
###
A PINTURA ###
A C5760 PINTURA DE ELEMENTOS METALICOS m2 100.00% 0.44 301.00 301.00 301.00 301.00
###
A DISCIPLINA: INSTALACIONES SANITARIAS ###
A TUBERIAS ###
A MONTANTE DE AGUAS DE LLUVIA
A C5780 975-SD-4"-P0E03U-100031
A C5780 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 0.25 2.00 2.00 0.00 0.00
###
A C5780 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
A C5780 975-SD-4"-P0E03U-100033
A C5780 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 0.25 2.00 2.00 0.00 0.00
###
A C5780 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
A C5780 975-SD-4"-P0E03U-100034
A C5780 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 0.25 2.00 2.00 0.00 0.00
###
A C5780 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
A C5780 El, 45Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
A C5780 975-SD-4"-P0E03U-100035
A C5780 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 0.29 2.00 2.00 0.00 0.00
###
A C5780 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
A MECÁNICA
A CANALETAS DE AGUAS DE LLUVIA
A C5780 ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 0.00% 1.68 106.00 106.00 0.00 0.00
###
A C5780 ACERO ESTRUCTURAL PLANCHA DE F°G° E= 0.8MM kg 0.00% 0.21 106.00 106.00 0.00 0.00
###
A SOPORTERIA
A C5780 GS1-4", Tubería 975-SD-4"-P0E03U-100031,100033,100034 & 100035 pza 0.00% 2.79 34.00 34.00 0.00 0.00
###
A DISCIPLINA: INSTALACIONES ELÉCTRICAS ###
A SALIDAS PARA ALUMBRADO Y TOMACORRIENTES
A C5790 SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE PHUZION 30 000LM - pto 0.00% 6.07 61.00 61.00 0.00 0.00
###
A C5790 SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE CZQ6L B LTP SDRT H pto 0.00% 6.07 18.00 18.00 0.00 0.00
###
A C5790 SUMINISTRO Y MONTAJE DE INTERRUPTOR DOBLE LEVINTON WATHERPROOF 5224-2W pto 0.00% 1.76 2.00 2.00 0.00 0.00
###
A C5790 SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON WATHERPROOF 5462-W pto 0.00% 4.40 22.00 22.00 0.00 0.00
###
A C5790 SUMINISTRO Y MONTAJE DE TOMACORRIENTE INDUSTRIAL TRIFÁSICO 32A MENNEKES 2700 pto 0.00% 5.60 6.00 6.00 0.00 0.00
###
A TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN
A C5790 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1132 UND 0.00% 90.09 90.00 90.00 0.00 0.00
###
A C5790 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-COA-913 UND 0.00% 60.00 60.00 60.00 0.00 0.00
###
A CANALIZACIONES, CONDUCTOS Y TUBERÍAS
A C5790 SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 0.90 147.00 147.00 0.00 0.00
###
A C5790 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 1"Ø m 0.00% 0.82 7.00 7.00 0.00 0.00
###
A C5790 SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.90 5.00 5.00 0.00 0.00
###
A C5790 SUMINISTRO E INSTALACIÓN DE TUBERIA FLEXIBLE Y ACCESORIOS RGS 1"ø m 0.00% 1.05 1.00 1.00 0.00 0.00
###
A C5790 SUMINISTRO E INSTALACIÓN DE TUBERIA FLEXIBLE Y ACCESORIOS RGS 2"ø m 0.00% 1.26 6.00 6.00 0.00 0.00
###
A C5790 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 1.22 33.00 33.00 0.00 0.00
###
A C5790 SUMINISTRO E INSTALACIÓN DE BANDEJA ESCALERILLA 450X150MM m 0.00% 1.65 79.00 79.00 0.00 0.00
###
A CONDUCTORES Y CABLES DE ENERGIA
A C5790 SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-4/C #2AWG + GRD; XHHW-2, 0.6KV M 0.00% 0.29 39.00 39.00 0.00 0.00
###
A C5790 SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW-2, 0.6KV M 0.00% 0.29 95.00 95.00 0.00 0.00
###
A C5790 SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-4/C #8AWG+GRD; XHHW-2, 0.6KV M 0.00% 1.00 65.00 65.00 0.00 0.00
###
A EQUIPOS ELÉCTRICOS
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
A C5750 INSTALACIÓN DE EQUIPO 1 TRITURADOR DE RESIDUOS ORGÁNICOS 13.42 KW 400 V TRIFÁ und 0.00% 40.00 40.00 40.00 0.00 0.00
###
A C5750 INSTALACIÓN DE EQUIPO DESHIDRATADORES 44.7 KW 440 V TRIFÁSICO EN COMPOSTAJE und 0.00% 62.00 186.00 186.00 0.00 0.00
###
A C5750 SUMINISTRO E INSTALACIÓN DE EQUIPO VENTILADOR 0.69HP - 220V EN COMPOSTAJE und 0.00% 4.24 8.00 8.00 0.00 0.00
###
A EQUIPOS MECÁNICOS
A C5740 SUMINISTRO Y MONTAJE DE EXTRACTOR EÓLICO DE 20" und 0.00% 7.07 42.00 42.00 0.00 0.00
###
B MÓDULO B: LOSA DE VOLATILIZACIÓN ###
B - DISCIPLINA: CIVIL ###
B MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS ###
B C1500 EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 0.00% 6.20 124.00 124.00 0.00 0.00
###
B C1500 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.00% 0.13 95.00 95.00 0.00 0.00
###
B C1520 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 0.00% 0.16 8.00 8.00 0.00 0.00
###
B C1520 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 0.00% 0.04 10.00 10.00 0.00 0.00
###
B C1520 MEJORAMIENTO CON MATERIAL FINO DE PRÉSTAMO m3 0.00% 0.62 24.00 24.00 0.00 0.00
###
B C1500 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.00% 0.11 3.00 3.00 0.00 0.00
###
B C1500 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.00% 0.05 2.00 2.00 0.00 0.00
###
B C1500 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.00% 0.23 6.00 6.00 0.00 0.00
###
B CONCRETO SIMPLE ###
B PEDESTAL
B C1530 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 6.00 6.00 0.00 0.00
###
B C1530 ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 0.00% 2.63 8.00 8.00 0.00 0.00
###
B C1530 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 5.00 5.00 0.00 0.00
###
B LOSA
B C1530 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 852.00 852.00 0.00 0.00
###
B C1530 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 0.00% 2.47 198.00 198.00 0.00 0.00
###
B C1530 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 710.00 710.00 0.00 0.00
###
B RAMPA
B C1530 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 29.00 29.00 0.00 0.00
###
B C1530 ENCOFRADO CARAVISTA Y DESENCOFRADO DE RAMPA m2 0.00% 2.47 10.00 10.00 0.00 0.00
###
B C1530 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 18.00 18.00 0.00 0.00
###
B CANAL DE DRENAJE
B C1530 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 286.00 286.00 0.00 0.00
###
B C1530 ENCOFRADO CARAVISTA Y DESENCOFRADO DE CANAL DE DRENAJE m2 0.00% 2.80 218.00 218.00 0.00 0.00
###
B C1530 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 75.00 75.00 0.00 0.00
###
B SARDINEL
B C1530 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 82.00 82.00 0.00 0.00
###
B C1530 ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 0.00% 2.47 225.00 225.00 0.00 0.00
###
B C1530 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 39.00 39.00 0.00 0.00
###
B CURADO DE CONCRETO CON ADITIVO
B C1530 CURADO DE CONCRETO CON ANTISOL m2 0.00% 0.14 130.00 130.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
B SELLADO DE JUNTAS
B C1530 SELLADO DE JUNTA TIPO 1 m 0.00% 0.70 67.00 67.00 0.00 0.00
###
B C1530 SELLADO DE JUNTA TIPO 2 m 0.00% 0.70 123.00 123.00 0.00 0.00
###
B C1530 SELLADO DE JUNTA TIPO 3 m 0.00% 0.70 32.00 32.00 0.00 0.00
###
B C1530 JUNTA TIPICA EN PEDESTAL m 0.00% 0.53 1.00 1.00 0.00 0.00
###
B BRUÑAS
B C1530 BRUÑADO EN RAMPA m2 0.00% 0.62 9.00 9.00 0.00 0.00
###
B APLICACIÓN DE GROUT E IMPERMEABILIZANTE
B C1550 GROUT PARA PEDESTAL E=2.5CM m2 0.00% 10.94 11.00 11.00 0.00 0.00
###
B GEOMEMBRANA Y GEOTEXTIL
B C1521 SUMINISTRO E INSTALACION GEOMEMBRANA E=1.5MM m2 0.00% 0.34 249.00 249.00 0.00 0.00
###
B C1521 SUMINISTRO E INSTALACION GEODREN TRIPLANAR m2 0.00% 0.51 374.00 374.00 0.00 0.00
###
B C1521 SUMINISTRO E INSTALACION GEOTEXTIL N60.1 DE 200gr/m2 m2 0.00% 0.34 17.00 17.00 0.00 0.00
###
B CARPINTERIA METALICA ###
B C1550 SUMINISTRO E INSTALACIÓN DE GRATING 1 1/4"x1/4"x0.35m m 42.13% 1.81 83.00 83.00 35.00 35.00
###
B ESTRUCTURAS METÁLICAS ###
B MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS ###
B C1550 INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE
B C1550 ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=3/4" kg 0.00% 0.18 1.00 1.00 0.00 0.00
###
B C1550 ACERO ESTRUCTURAL PLANCHA 1/2" kg 60.00% 0.06 1.00 1.00 0.00 0.00
###
B INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
B C1550 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 0.00% 0.09 0.00 0.00 0.00 0.00
###
MÓDULO C: ALMACÉN TEMPORAL DE RESIDUOS BIOCONTAMINADOS ###
C - DISCIPLINA: CIVIL ###
C CONCRETO ARMADO ###
C PEDESTAL
C C1600 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 6.00 6.00 0.00 0.00
###
C C1600 ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 0.00% 2.63 3.00 3.00 0.00 0.00
###
C C1600 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 2.00 2.00 0.00 0.00
###
C SARDINEL
C C1600 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 6.00 6.00 0.00 0.00
###
C C1600 ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 0.00% 2.47 12.00 12.00 0.00 0.00
###
C C1600 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 4.00 4.00 0.00 0.00
###
C CURADO DE CONCRETO CON ADITIVO
C C1600 CURADO DE CONCRETO CON ANTISOL m2 0.00% 0.14 1.00 1.00 0.00 0.00
###
C APLICACIÓN DE GROUT E IMPERMEABILIZANTE
C C1610 GROUT PARA PEDESTAL E=2.5CM m2 0.00% 10.94 11.00 11.00 0.00 0.00
###
C CARPINTERIA METALICA ###
C C1610 INSTALACIÓN DE PUERTA CONTRAPLACADA REUTILIZABLE und 0.00% 16.00 16.00 16.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
C ESTRUCTURAS METÁLICAS ###
C DESMONTAJE DE ESTRUCTURAS METALICAS EXISTENTES ###
C C9500 DESMONTAJE DE CORREAS REUTILIZABLES kg 100.00% 0.05 10.00 10.00 10.00 10.00
###
C C9500 DESMONTAJE DE TIJERALES REUTILIZABLES kg 100.00% 0.04 3.00 3.00 3.00 3.00
###
C C9500 DESMONTAJE DE VIGAS DE ARRIOSTRE REUTILIZABLES kg 100.00% 0.03 3.00 3.00 3.00 3.00
###
C C9500 DESMONTAJE DE COLUMNAS REUTILIZABLES kg 100.00% 0.03 7.00 7.00 7.00 7.00
###
C MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES ###
C C1610 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS REUTILIZABLES kg 0.00% 0.06 13.00 13.00 0.00 0.00
###
C C1610 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES REUTILIZABLES kg 0.00% 0.08 6.00 6.00 0.00 0.00
###
C C1610 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE REUTILIZABLES kg 0.00% 0.06 5.00 5.00 0.00 0.00
###
C C1610 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS REUTILIZABLES kg 0.00% 0.10 20.00 20.00 0.00 0.00
###
C MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS ###
C C1610 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS
C C1610 ACERO ESTRUCTURAL PLANCHA 1/2" kg 60.00% 0.06 3.00 3.00 2.00 2.00
###
C C1610 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE
C C1610 ACERO ESTRUCTURAL PLANCHA 1/4" kg 0.87% 0.05 2.00 2.00 0.00 0.00
###
C C1610 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS
C C1610 ACERO ESTRUCTURAL ANGULO L-1 1/2"x1/8" kg 0.00% 0.12 0.00 0.00 0.00 0.00
###
C C1610 SUMINISTRO, INSTALACIÓN DE PANELES DE MALLA GALVANIZADA
C C1610 ACERO ESTRUCTURAL ANGULO L-2"x1/8" kg 0.00% 0.12 1.00 1.00 0.00 0.00
###
C C1610 ACERO ESTRUCTURAL ANGULO L-1 1/2"x1/8" kg 59.59% 0.12 16.00 16.00 10.00 10.00
###
C C1610 ACERO ESTRUCTURAL ANGULO L - 1"x1"x1/8" kg 60.00% 0.12 2.00 2.00 1.00 1.00
###
C C1610 ACERO ESTRUCTURAL PLATINA 1/8"x1 1/4" kg 0.00% 0.13 0.00 0.00 0.00 0.00
###
C C1610 MALLA GALVANIZADA #8 - 2"x2" kg 60.00% 0.23 10.00 10.00 6.00 6.00
###
C C1610 SUMINISTRO, INSTALACIÓN DE COBERTURA
C C1610 SUMINISTRO, INSTALACIÓN COBERTURA TR-4, E=0.5mm m2 59.66% 0.43 15.00 15.00 9.00 9.00
###
C INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
C C1610 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 0.00% 0.09 4.00 4.00 0.00 0.00
###
C LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES
C C1610 LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 0.00% 0.50 14.00 14.00 0.00 0.00
###
C PINTURA ###
C C1610 PINTURA DE ELEMENTOS METALICOS m2 100.00% 0.44 62.00 62.00 62.00 62.00
###
C TRANSPORTE DE ELEMENTOS ESTRUCTURALES ###
C C9500 TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 100.00% 0.02 10.00 10.00 10.00 10.00
###
C DISCIPLINA: INSTALACIONES ELÉCTRICAS ###
C SALIDAS PARA ALUMBRADO Y TOMACORRIENTES
C C1630 ARTEFACTO DE ALUMBRADO LITHONIA LIGHTING FEM L48 8000LM LPPFL WD 90CRI 50K pto 0.00% 7.28 15.00 15.00 0.00 0.00
###
C C1630 SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE CZQ6L B LTP SDRT H pto 0.00% 2.93 3.00 3.00 0.00 0.00
###
C C1630 SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON 1286W pto 0.00% 1.76 2.00 2.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
C C1630 SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON 5462-W pto 0.00% 1.76 4.00 4.00 0.00 0.00
###
C C1630 SUMINISTRO Y MONTAJE DE TOMACORRIENTE INDUSTRIAL TRIFÁSICO 32A MENNEKES 2700 pto 0.00% 5.60 6.00 6.00 0.00 0.00
###
C TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN
C C1630 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1133 UND 0.00% 90.91 91.00 91.00 0.00 0.00
###
C CANALIZACIONES, CONDUCTOS Y TUBERÍAS
C C1630 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 1"Ø m 0.00% 0.82 7.00 7.00 0.00 0.00
###
C C1630 SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 0.90 29.00 29.00 0.00 0.00
###
C CONDUCTORES Y CABLES DE ENERGIA
C C1630 SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW-2, 0.6KV M 0.00% 0.29 7.00 7.00 0.00 0.00
###
C C1630 SUMINISTRO E INSTALACIÓN DE CABLE 2-1/c #12 AWG + GRD; XHHW-2, 0.6 Kv M 0.00% 0.29 5.00 5.00 0.00 0.00
###
C C1630 SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #12 AWG + GRD, XHHW-2, 0.6 Kv m 0.00% 1.00 11.00 11.00 0.00 0.00
###
C EQUIPOS ELÉCTRICOS
C C1620 INSTALACIÓN DE EQUIPO 1 AUTOCLAVE 10 KW 400 V TRIFÁSICO EN ALMACÉN DE BIOCON und 0.00% 62.00 62.00 62.00 0.00 0.00
###
D MÓDULO D: ALMACÉN TEMPORAL DE RESIDUOS PELIGROSOS ###
D - DISCIPLINA: CIVIL ###
D MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS ###
D C1000 EXCAVACION P/ZAPATAS m3 100.00% 1.53 88.00 88.00 88.00 88.00
###
D C1000 EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 6.20 105.00 105.00 105.00 105.00
###
D C1000 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.13 41.00 41.00 41.00 41.00
###
D C1330 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.16 1.00 1.00 1.00 1.00
###
D C1330 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 100.00% 0.04 1.00 1.00 1.00 1.00
###
D C1330 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 100.00% 3.55 89.00 89.00 89.00 89.00
###
D C1330 MEJORAMIENTO CON MATERIAL GRANULAR m3 100.00% 0.62 4.00 4.00 4.00 4.00
###
D C1330 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.11 7.00 7.00 7.00 7.00
###
D C1330 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.05 6.00 6.00 6.00 6.00
###
D C1330 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.23 15.00 15.00 15.00 15.00
###
D CONCRETO ARMADO ###
D CONCRETO SIMPLE PARA ZAPATAS
D C1300 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 6.18 25.00 25.00 25.00 25.00
###
D CONCRETO SIMPLE PARA LOSAS DE EQUIPOS
D C1340 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 12.00 12.00 0.00 0.00
###
D C1340 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA PARA EQUIPOS m2 0.00% 2.47 7.00 7.00 0.00 0.00
###
D CURADO DE CONCRETO CON ADITIVO
D C1340 CURADO DE CONCRETO CON ANTISOL m2 0.00% 0.14 3.00 3.00 0.00 0.00
###
B CONCRETO ARMADO
D ZAPATAS
D C1310 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 128.00 128.00 128.00 128.00
###
D C1310 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 76.00 76.00 76.00 76.00
###
D PEDESTAL
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
D C1310 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 29.00 29.00 29.00 29.00
###
D C1310 ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 100.00% 2.63 126.00 126.00 126.00 126.00
###
D C1310 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 98.00 98.00 98.00 98.00
###
D LOSA
D C1350 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 502.00 502.00 502.00 502.00
###
D C1350 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 2.47 109.00 109.00 109.00 109.00
###
D C1350 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 403.00 403.00 403.00 403.00
###
D RAMPA
D C1350 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 52.00 52.00 0.00 0.00
###
D C1350 ENCOFRADO CARAVISTA Y DESENCOFRADO DE RAMPA m2 0.00% 2.47 22.00 22.00 0.00 0.00
###
D C1350 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 66.27% 0.12 38.00 38.00 25.00 25.00
###
D CANAL DE DRENAJE
D C1350 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 25.00% 5.83 47.00 47.00 12.00 12.00
###
D C1350 ENCOFRADO CARAVISTA Y DESENCOFRADO DE CANAL DE DRENAJE m2 34.48% 2.80 81.00 81.00 28.00 28.00
###
D C1350 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 48.73% 0.12 56.00 56.00 27.00 27.00
###
D ALCANTARILLA
D C1350 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 6.00 6.00 0.00 0.00
###
D C1350 ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 2.47 2.00 2.00 0.00 0.00
###
D C1350 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 6.00 6.00 6.00 6.00
###
D SARDINEL
D C1350 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 70.00 70.00 0.00 0.00
###
D C1350 ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 0.00% 2.47 212.00 212.00 0.00 0.00
###
D C1350 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 56.95% 0.12 36.00 36.00 20.00 20.00
###
D CURADO DE CONCRETO CON ADITIVO
D C1350 CURADO DE CONCRETO CON ANTISOL m2 23.95% 0.14 85.00 85.00 20.00 20.00
###
D SELLADO DE JUNTAS
D C1350 SELLADO DE JUNTA TIPO 1 m 0.00% 0.70 46.00 46.00 0.00 0.00
###
D C1350 SELLADO DE JUNTA TIPO 2 m 0.00% 0.70 49.00 49.00 0.00 0.00
###
D C1350 SELLADO DE JUNTA TIPO 3 m 0.00% 0.70 13.00 13.00 0.00 0.00
###
D C1350 JUNTA TIPICA EN PEDESTAL m 0.00% 0.53 19.00 19.00 0.00 0.00
###
D BRUÑAS
D C1350 BRUÑADO EN RAMPA m2 0.00% 0.62 22.00 22.00 0.00 0.00
###
D APLICACIÓN DE GROUT E IMPERMEABILIZANTE
D C1360 GROUT PARA PEDESTAL E=2.5CM m2 0.00% 10.94 44.00 44.00 0.00 0.00
###
D CARPINTERIA METALICA ###
D C1360 SUMINISTRO E INSTALACIÓN DE PUERTA CORREDIZA P03 INC. RIEL SUP. Y ACCESORIOS und 0.00% 32.00 32.00 32.00 0.00 0.00
###
D C1360 SUMINISTRO E INSTALACIÓN DE PUERTA CORREDIZA P04 INC. RIEL SUP. Y ACCESORIOS und 60.00% 32.00 32.00 32.00 19.00 19.00
###
D C1360 SUMINISTRO E INSTALACIÓN DE PUERTA CORREDIZA P05 INC. RIEL SUP. Y ACCESORIOS und 60.00% 62.00 62.00 62.00 37.00 37.00
###
D C1360 SUMINISTRO E INSTALACIÓN DE PUERTA CORREDIZA P06 INC. RIEL SUP. Y ACCESORIOS und 60.00% 42.00 42.00 42.00 25.00 25.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
D C1360 SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.50m m 58.70% 2.72 98.00 98.00 58.00 58.00
###
D ESTRUCTURAS METÁLICAS ###
D MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS ###
D C1360 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS
D C1360 ACERO ESTRUCTURAL PERFIL W 8x40 lb/ft kg 100.00% 0.05 185.00 185.00 185.00 185.00
###
D C1360 ACERO ESTRUCTURAL PERFIL W 8x24 lb/ft kg 100.00% 0.06 104.00 104.00 104.00 104.00
###
D C1360 ACERO ESTRUCTURAL PERFIL W 6x25 lb/ft kg 100.00% 0.06 19.00 19.00 19.00 19.00
###
D C1360 ACERO ESTRUCTURAL PLANCHA 3/4" kg 100.00% 0.06 51.00 51.00 51.00 51.00
###
D C1360 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES
D C1360 ACERO ESTRUCTURAL PERFIL W 8x40 lb/ft kg 100.00% 0.05 36.00 36.00 36.00 36.00
###
D C1360 ACERO ESTRUCTURAL PERFIL W 6x25 lb/ft kg 100.00% 0.06 215.00 215.00 215.00 215.00
###
D C1360 ACERO ESTRUCTURAL PLANCHA 5/8" kg 100.00% 0.05 32.00 32.00 32.00 32.00
###
D C1360 ACERO ESTRUCTURAL PLANCHA 1/2" kg 100.00% 0.06 3.00 3.00 3.00 3.00
###
D C1360 ACERO ESTRUCTURAL PLANCHA 3/8" kg 100.00% 0.06 8.00 8.00 8.00 8.00
###
D C1360 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE
D C1360 ACERO ESTRUCTURAL PERFIL W 8x40 lb/ft kg 100.00% 0.05 70.00 70.00 70.00 70.00
###
D C1360 ACERO ESTRUCTURAL PERFIL W 8x13 lb/ft kg 100.00% 0.06 92.00 92.00 92.00 92.00
###
D C1360 ACERO ESTRUCTURAL PERFIL W6x25 lb/ft kg 100.00% 0.06 9.00 9.00 9.00 9.00
###
D C1360 ACERO ESTRUCTURAL PERFIL W6x15 lb/ft kg 100.00% 0.06 15.00 15.00 15.00 15.00
###
D C1360 ACERO ESTRUCTURAL TUBO 4"x4"x7.9mm kg 100.00% 0.06 9.00 9.00 9.00 9.00
###
D C1360 ACERO ESTRUCTURAL PLANCHA 1/2" kg 100.00% 0.06 23.00 23.00 23.00 23.00
###
D C1360 ACERO ESTRUCTURAL PLANCHA 1/4" kg 100.00% 0.05 10.00 10.00 10.00 10.00
###
D C1360 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS
D C1360 ACERO ESTRUCTURAL PERFIL C 6"x2"x1/8" kg 100.00% 0.09 463.00 463.00 463.00 463.00
###
D C1360 ACERO ESTRUCTURAL ANGULO 5"x5"x3/8" kg 100.00% 0.09 52.00 52.00 52.00 52.00
###
D C1360 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL DIAGONALES
D C1360 ACERO ESTRUCTURAL TUBO 2"x2"x3mm kg 100.00% 0.13 26.00 26.00 26.00 26.00
###
D C1360 ACERO ESTRUCTURAL PLANCHA 3/8" kg 100.00% 0.06 5.00 5.00 5.00 5.00
###
D C1360 ACERO ESTRUCTURAL PLANCHA 1/4" kg 100.00% 0.05 2.00 2.00 2.00 2.00
###
D C1360 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES
D C1360 ACERO ESTRUCTURAL FIERRO LISO Ø5/8" kg 100.00% 0.11 52.00 52.00 52.00 52.00
###
D C1360 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VENTANAS
D C1360 ACERO ESTRUCTURAL ANGULO 2"x2"x1/8" kg 100.00% 0.12 6.00 6.00 6.00 6.00
###
D C1360 ACERO ESTRUCTURAL PLANCHA 3/8" kg 100.00% 0.06 11.00 11.00 11.00 11.00
###
D C1360 ACERO ESTRUCTURAL ANGULO 1 1/2"x1 1/2"x1/8" kg 100.00% 0.12 2.00 2.00 2.00 2.00
###
D C1360 SUMINISTRO, INSTALACIÓN DE COBERTURA
D C1360 SUMINISTRO, INSTALACIÓN COBERTURA TR-4 m2 100.00% 0.43 175.00 175.00 175.00 175.00
###
D C1360 SUMINISTRO, INSTALACIÓN COBERTURA TR-4 TRANSLUCIDO m2 100.00% 0.43 30.00 30.00 30.00 30.00
###
D C1360 SUMINISTRO, INSTALACIÓN DE CERRAMIENTO
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
D C1360 SUMINISTRO, INSTALACIÓN CERRAMIENTO TR-4 m2 70.00% 0.43 219.00 219.00 153.00 153.00
###
D C1360 SUMINISTRO, INSTALACIÓN DE CUMBRERA
D C1360 SUMINISTRO, INSTALACIÓN DE CUMBRERA TR-4 m 100.00% 0.17 6.00 6.00 6.00 6.00
###
D C1360 SUMINISTRO, INSTALACIÓN DE ESQUINEROS
D C1360 SUMINISTRO, INSTALACIÓN ESQUINEROS TR-4 m 57.65% 0.17 6.00 6.00 3.00 3.00
###
D C1360 SUMINISTRO, INSTALACIÓN REMATES
D C1360 SUMINISTRO, INSTALACIÓN REMATES TR-4 m 65.28% 0.17 9.00 9.00 6.00 6.00
###
D C1360 INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE
D C1360 ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=3/4" kg 100.00% 0.18 22.00 22.00 22.00 22.00
###
D INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
D C1360 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 50.00% 0.09 103.00 103.00 52.00 52.00
###
D PINTURA ###
D C1377 PINTURA DE ELEMENTOS METALICOS m2 60.00% 0.44 589.00 589.00 353.00 353.00
###
D DISCIPLINA: INSTALACIONES SANITARIAS ###
D TUBERIAS ###
D MONTANTE DE AGUAS DE LLUVIA
D C1375 975-SD-4"-P0E03U-10001
D C1375 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 0.61 9.00 9.00 0.00 0.00
###
D C1375 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
D C1375 975-SD-4"-P0E03U-10002
D C1375 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 0.92 9.00 9.00 0.00 0.00
###
D C1375 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
D C1375 975-SD-4"-P0E03U-100027
D C1375 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 1.14 9.00 9.00 0.00 0.00
###
D C1375 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
D C1375 975-SD-4"-P0E03U-100028
D C1375 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 0.70 9.00 9.00 0.00 0.00
###
D C1375 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
D MECÁNICA
D CANALETAS DE AGUAS DE LLUVIA
D C1375 ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 0.00% 0.37 24.00 24.00 0.00 0.00
###
D C1375 ACERO ESTRUCTURAL PLANCHA FIERRO GALVANIZADO E=0.8 MM kg 0.00% 0.38 188.00 188.00 0.00 0.00
###
D SOPORTERIA
D C1375 GS1-4", Tubería 975-SD-4"-P0E03U-10001,10002,100027 & 100028 pza 0.00% 3.00 60.00 60.00 0.00 0.00
###
D DISCIPLINA: INSTALACIONES ELÉCTRICAS ###
D SALIDAS PARA ALUMBRADO Y TOMACORRIENTES
D C1380 SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE PHUZION 30 000LM - pto 0.00% 6.07 85.00 85.00 0.00 0.00
###
D C1380 SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE CZQ6L B LTP SDRT H pto 0.00% 6.07 18.00 18.00 0.00 0.00
###
D C1380 SUMINISTRO Y MONTAJE DE INTERRUPTOR DOBLE LEVINTON WATHERPROOF 5224-2W pto 0.00% 1.76 2.00 2.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
D C1380 SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON WATHERPROOF 5462-W pto 0.00% 4.40 22.00 22.00 0.00 0.00
###
D C1380 SUMINISTRO Y MONTAJE DE TOMACORRIENTE INDUSTRIAL MONOFÁSICO 32A MENNEKES 27 pto 0.00% 5.60 6.00 6.00 0.00 0.00
###
D TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN
D C1380 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1155 UND 0.00% 90.01 90.00 90.00 0.00 0.00
###
D C1380 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-COA-958 und 0.00% 60.00 60.00 60.00 0.00 0.00
###
D C1380 SUMINISTRO Y MONTAJE DE TRANSFORMADOR 975-XFZ-1073 und 0.00% 20.00 20.00 20.00 0.00 0.00
###
D C1380 SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE 230x330x183mm; A°F° RI
UND 0.00% 1.38 8.00 8.00 0.00 0.00
###
D CANALIZACIONES, CONDUCTOS Y TUBERÍAS
D C1380 SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 0.90 220.00 220.00 0.00 0.00
###
D C1380 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 1"Ø m 0.00% 0.82 55.00 55.00 0.00 0.00
###
D C1380 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 1 1/2"Ø m 0.00% 1.19 4.00 4.00 0.00 0.00
###
D C1380 SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.90 9.00 9.00 0.00 0.00
###
D C1380 SUMINISTRO E INSTALACIÓN DE TUBERIA FLEXIBLE Y ACCESORIOS RGS 1"ø m 0.00% 1.05 1.00 1.00 0.00 0.00
###
D C1380 SUMINISTRO E INSTALACIÓN DE BANDEJA ESCALERILLA 450X150MM m 0.00% 1.65 51.00 51.00 0.00 0.00
###
D CONDUCTORES Y CABLES DE ENERGIA
D C1380 SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #4 AWG + GRD; XHHW-2, 0.6 Kv M 0.00% 0.29 1.00 1.00 0.00 0.00
###
D C1380 SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #8 AWG + GRD; XHHW-2, 0.6 Kv M 0.00% 0.29 1.00 1.00 0.00 0.00
###
D C1380 SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #10 AWG + GRD; XHHW-2, 0.6 Kv M 0.00% 0.29 81.00 81.00 0.00 0.00
###
D C1380 SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #12 AWG + GRD; XHHW-2, 0.6 Kv M 0.00% 1.00 281.00 281.00 0.00 0.00
###
D C1380 SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #12 AWG + GRD, XHHW-2, 0.6 Kv m 0.00% 1.00 157.00 157.00 0.00 0.00
###
D EQUIPOS ELÉCTRICOS ###
D C1370 INSTALACIÓN DE EQUIPO LAVADORA INDUSTRIAL 5.59 KW 400 V TRIFÁSICO EN ALMACÉN und 0.00% 62.00 124.00 124.00 0.00 0.00
###
D C1370 INSTALACIÓN DE EQUIPO SECADORA INDUSTRIAL 2.24 KW 220 V TRIFÁSICO EN ALMACÉN und 0.00% 62.00 124.00 124.00 0.00 0.00
###
D C1370 ENFARDADOR VERTICAL 4.1 KW 380 V TRIFASICO EN ALMACEN DE RESIDUOS PELIGROSOS und 0.00% 17.71 18.00 18.00 0.00 0.00
###
D C1370 INSTALACIÓN DE EQUIPO 1 COMPACTADORA DE FILTROS 11.19 KW 220 V TRIFÁSICO EN und 0.00% 19.08 19.00 19.00 0.00 0.00
###
D C1370 INSTALACIÓN DE EQUIPO 1 TRITURADOR DE FLUORESCENTES 2.24 KW 200 V MONOFÁSI und 0.00% 10.33 10.00 10.00 0.00 0.00
###
D EQUIPOS MECÁNICOS
D C1380 MONTAJE DE EXTRACTOR EÓLICO DE 20" REUTILIZABLE und 0.00% 12.80 64.00 64.00 0.00 0.00
###
D C1380 SUMINISTRO Y MONTAJE DE EXTRACTOR EÓLICO DE 20" und 0.00% 10.67 21.00 21.00 0.00 0.00
###
D C1380 INSTALACION DE EQUIPO 1 DESPRESURIZADOR DE AEROSOLES und 0.00% 7.33 7.00 7.00 0.00 0.00
###
MÓDULO E: RAMPA DE DESCARGA ###
E - DISCIPLINA: CIVIL ###
E MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS ###
E C1401 EXCAVACION MASIVA CON EQUIPO m3 100.00% 1.45 426.00 426.00 426.00 426.00
###
E C1401 EXCAVACION P/ZAPATAS m3 100.00% 1.53 32.00 32.00 32.00 32.00
###
E C1401 EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 0.00% 6.20 12.00 12.00 0.00 0.00
###
E C1401 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.13 43.00 43.00 43.00 43.00
###
E C1420 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.16 10.00 10.00 10.00 10.00
###
E C1420 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 100.00% 0.04 14.00 14.00 14.00 14.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
E C1420 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 51.80% 3.55 107.00 107.00 55.00 55.00
###
E C1420 MEJORAMIENTO CON MATERIAL GRANULAR m3 12.00% 0.62 32.00 32.00 4.00 4.00
###
E C1420 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.11 40.00 40.00 40.00 40.00
###
E C1420 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.05 33.00 33.00 33.00 33.00
###
E C1401 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.23 82.00 82.00 82.00 82.00
###
C CONCRETO ARMADO ###
E CONCRETO SIMPLE PARA ZAPATAS
E C1400 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 6.18 12.00 12.00 12.00 12.00
###
D CONCRETO ARMADO
E ZAPATAS
E C1400 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 29.00 29.00 29.00 29.00
###
E C1400 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 22.00 22.00 22.00 22.00
###
E PEDESTAL
E C1400 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 12.00 12.00 12.00 12.00
###
E C1400 ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 100.00% 2.63 42.00 42.00 42.00 42.00
###
E C1400 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 31.00 31.00 31.00 31.00
###
E LOSA
E C1430 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 525.00 525.00 0.00 0.00
###
E C1430 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 0.00% 2.47 89.00 89.00 0.00 0.00
###
E C1430 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 63.96% 0.12 722.00 722.00 462.00 462.00
###
E MUROS
E C1430 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 146.00 146.00 0.00 0.00
###
E C1430 ENCOFRADO CARAVISTA Y DESENCOFRADO DE MURO m2 0.00% 3.50 627.00 627.00 0.00 0.00
###
E C1430 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 58.96% 0.12 183.00 183.00 108.00 108.00
###
E CANAL DE DRENAJE
E C1430 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 6.00 6.00 0.00 0.00
###
E C1430 ENCOFRADO CARAVISTA Y DESENCOFRADO DE CANAL DE DRENAJE m2 0.00% 2.80 8.00 8.00 0.00 0.00
###
E C1430 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 8.00 8.00 0.00 0.00
###
E SARDINEL
E C1430 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 17.00 17.00 0.00 0.00
###
E C1430 ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 0.00% 2.47 32.00 32.00 0.00 0.00
###
E C1430 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 78.50% 0.12 4.00 4.00 3.00 3.00
###
E CURADO DE CONCRETO CON ADITIVO
E C1430 CURADO DE CONCRETO CON ANTISOL m2 10.09% 0.14 47.00 47.00 5.00 5.00
###
E SELLADO DE JUNTAS
E C1430 SELLADO DE JUNTA TIPO 3 m 0.00% 0.70 9.00 9.00 0.00 0.00
###
E BRUÑAS
E C1430 BRUÑADO EN RAMPA m2 0.00% 0.62 146.00 146.00 0.00 0.00
###
E APLICACIÓN DE GROUT E IMPERMEABILIZANTE
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
E C1440 GROUT PARA PEDESTAL E=2.5CM m2 0.00% 10.94 11.00 11.00 0.00 0.00
###
E CARPINTERIA METALICA ###
E C1440 SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.40m m 60.00% 2.09 13.00 13.00 8.00 8.00
###
E ESTRUCTURAS METÁLICAS ###
E MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS ###
E C1440 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS
E C1440 ACERO ESTRUCTURAL PERFIL W 8x48 lb/ft kg 100.00% 0.05 177.00 177.00 177.00 177.00
###
E C1440 ACERO ESTRUCTURAL TUBO 4"x4"x7.9mm kg 100.00% 0.06 30.00 30.00 30.00 30.00
###
E C1440 ACERO ESTRUCTURAL PLANCHA 3/4" kg 100.00% 0.06 9.00 9.00 9.00 9.00
###
E C1440 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES
E C1440 ACERO ESTRUCTURAL PERFIL W 8x48 lb/ft kg 100.00% 0.05 96.00 96.00 96.00 96.00
###
E C1440 ACERO ESTRUCTURAL PLANCHA 1/2" kg 100.00% 0.06 7.00 7.00 7.00 7.00
###
E C1440 ACERO ESTRUCTURAL PLANCHA 3/8" kg 100.00% 0.06 12.00 12.00 12.00 12.00
###
E C1440 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE
E C1440 ACERO ESTRUCTURAL TUBO 4"x4"x7.9mm kg 100.00% 0.06 44.00 44.00 44.00 44.00
###
E C1440 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS
E C1440 ACERO ESTRUCTURAL PERFIL U 6"x2"x4.5mm kg 100.00% 0.09 122.00 122.00 122.00 122.00
###
E C1440 ACERO ESTRUCTURAL TUBO CUADRADO 2 1/2"x2 1/2"x6mm kg 100.00% 0.12 87.00 87.00 87.00 87.00
###
E C1440 ACERO ESTRUCTURAL ANGULO 4"x6.35mm kg 100.00% 0.09 3.00 3.00 3.00 3.00
###
E C1440 ACERO ESTRUCTURAL PLANCHA 3/8" kg 100.00% 0.06 19.00 19.00 19.00 19.00
###
E C1440 ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 100.00% 0.13 4.00 4.00 4.00 4.00
###
E C1440 ACERO ESTRUCTURAL PLANCHA FIERRO GALVANIZADO E=0.8 MM kg 100.00% 0.09 20.00 20.00 20.00 20.00
###
E C1440 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES
E C1440 ACERO ESTRUCTURAL FIERRO LISO Ø1/2" kg 100.00% 0.11 2.00 2.00 2.00 2.00
###
E C1440 SUMINISTRO, INSTALACIÓN DE COBERTURA
E C1440 SUMINISTRO, INSTALACIÓN COBERTURA TR-4 m2 100.00% 0.43 55.00 55.00 55.00 55.00
###
E C1440 SUMINISTRO, INSTALACIÓN DE CUMBRERA
E C1440 SUMINISTRO, INSTALACIÓN DE CUMBRERA TR-4 m 100.00% 0.17 2.00 2.00 2.00 2.00
###
E C1440 INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE
E C1440 ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=3/4" kg 100.00% 0.18 8.00 8.00 8.00 8.00
###
E INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
E C1440 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 100.00% 0.09 45.00 45.00 45.00 45.00
###
E PINTURA ###
E C1460 PINTURA DE ELEMENTOS METALICOS m2 100.00% 0.44 172.00 172.00 172.00 172.00
###
E DISCIPLINA: INSTALACIONES SANITARIAS ###
E TUBERIAS ###
E MONTANTE DE AGUAS DE LLUVIA
E C1450 975-SD-4"-P0E03U-10003
E C1450 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 0.74 10.00 10.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
E C1450 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
E C1450 975-SD-4"-P0E03U-100015
E C1450 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 0.74 10.00 10.00 0.00 0.00
###
E C1450 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
E MECÁNICA
E CANALETAS DE AGUAS DE LLUVIA
E C1450 ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 0.00% 0.04 1.00 1.00 0.00 0.00
###
E C1450 ACERO ESTRUCTURAL PLANCHA FIERRO GALVANIZADO E=0.8 MM kg 0.00% 0.04 7.00 7.00 0.00 0.00
###
E SOPORTERIA
E C1450 GS1-4", Tubería 975-SD-4"-P0E03U-10003 & 100015 pza 0.00% 3.00 30.00 30.00 0.00 0.00
###
E DISCIPLINA: INSTALACIONES ELÉCTRICAS ###
E SALIDAS PARA ALUMBRADO Y TOMACORRIENTES
E C1480 SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE PHUZION 30 000LM - pto 0.00% 6.07 12.00 12.00 0.00 0.00
###
E C1480 SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE CZQ6L B LTP SDRT H pto 0.00% 2.93 6.00 6.00 0.00 0.00
###
E C1480 SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON WATHERPROOF 1286W pto 0.00% 1.76 2.00 2.00 0.00 0.00
###
E C1480 SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON WATHERPROOF 5462-W pto 0.00% 4.40 4.00 4.00 0.00 0.00
###
F MÓDULO F: ALMACÉN TEMPORAL DE RESIDUOS RECICLABLES ###
F - DISCIPLINA: CIVIL ###
F MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS ###
F C2301 EXCAVACION P/ZAPATAS m3 100.00% 1.53 122.00 122.00 122.00 122.00
###
F C2301 EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 6.20 68.00 68.00 68.00 68.00
###
F C2301 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.13 6.00 6.00 6.00 6.00
###
F C2301 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.16 2.00 2.00 2.00 2.00
###
F C2301 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 100.00% 0.04 2.00 2.00 2.00 2.00
###
F C2310 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 100.00% 3.55 188.00 188.00 188.00 188.00
###
F C2310 MEJORAMIENTO CON MATERIAL GRANULAR m3 100.00% 0.62 5.00 5.00 5.00 5.00
###
F C2310 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.11 5.00 5.00 5.00 5.00
###
F C2310 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.05 4.00 4.00 4.00 4.00
###
F C2310 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.23 11.00 11.00 11.00 11.00
###
F CONCRETO ARMADO ###
F CONCRETO SIMPLE PARA ZAPATAS
F C2300 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 6.18 31.00 31.00 31.00 31.00
###
F CONCRETO ARMADO
F ZAPATAS
F C2300 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 93.00 93.00 93.00 93.00
###
F C2300 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 96.00 96.00 96.00 96.00
###
F PEDESTAL
F C2300 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 23.00 23.00 23.00 23.00
###
F C2300 ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 100.00% 2.63 11.00 11.00 11.00 11.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
F C2300 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 36.00 36.00 36.00 36.00
###
F LOSA
F C2320 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 437.00 437.00 437.00 437.00
###
F C2320 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 2.47 40.00 40.00 40.00 40.00
###
F C2320 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 368.00 368.00 368.00 368.00
###
F RAMPA
F C2320 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 23.00 23.00 0.00 0.00
###
F C2320 ENCOFRADO CARAVISTA Y DESENCOFRADO DE RAMPA m2 0.00% 2.47 15.00 15.00 0.00 0.00
###
F C2320 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 19.00 19.00 0.00 0.00
###
F CANAL DE DRENAJE
F C2320 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 47.00 47.00 0.00 0.00
###
F C2320 ENCOFRADO CARAVISTA Y DESENCOFRADO DE CANAL DE DRENAJE m2 0.00% 2.80 81.00 81.00 0.00 0.00
###
F C2320 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 45.00 45.00 0.00 0.00
###
F CURADO DE CONCRETO CON ADITIVO
F C2320 CURADO DE CONCRETO CON ANTISOL m2 60.00% 0.14 67.00 67.00 40.00 40.00
###
F SELLADO DE JUNTAS
F C2320 SELLADO DE JUNTA TIPO 1 m 0.00% 0.70 25.00 25.00 0.00 0.00
###
F C2320 SELLADO DE JUNTA TIPO 2 m 0.00% 0.70 29.00 29.00 0.00 0.00
###
F C2320 SELLADO DE JUNTA TIPO 3 m 0.00% 0.70 20.00 20.00 0.00 0.00
###
F C2320 JUNTA TIPICA EN PEDESTAL m 0.00% 0.53 11.00 11.00 0.00 0.00
###
F BRUÑAS
F C2320 BRUÑADO EN RAMPA m2 0.00% 0.62 9.00 9.00 0.00 0.00
###
F APLICACIÓN DE GROUT E IMPERMEABILIZANTE
F C2330 GROUT PARA PEDESTAL E=2.5CM m2 0.00% 10.94 33.00 33.00 0.00 0.00
###
F CARPINTERIA METALICA ###
F C2330 SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.50m m 60.00% 2.72 57.00 57.00 34.00 34.00
###
F ESTRUCTURAS METÁLICAS ###
F MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS ###
F C2330 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS
F C2330 ACERO ESTRUCTURAL PERFIL W 12x58 lb/ft kg 100.00% 0.05 208.00 208.00 208.00 208.00
###
F C2330 ACERO ESTRUCTURAL PLANCHA 3/4" kg 100.00% 0.06 34.00 34.00 34.00 34.00
###
F C2330 ACERO ESTRUCTURAL PLANCHA 5/8" kg 100.00% 0.05 14.00 14.00 14.00 14.00
###
F C2330 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES
F C2330 ACERO ESTRUCTURAL PERFIL W14x34 lb/ft kg 100.00% 0.06 249.00 249.00 249.00 249.00
###
F C2330 ACERO ESTRUCTURAL PLANCHA 5/8" kg 100.00% 0.05 24.00 24.00 24.00 24.00
###
F C2330 ACERO ESTRUCTURAL PLANCHA 1/2" kg 100.00% 0.06 6.00 6.00 6.00 6.00
###
F C2330 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE
F C2330 ACERO ESTRUCTURAL PERFIL W 8x24 lb/ft kg 100.00% 0.06 74.00 74.00 74.00 74.00
###
F C2330 ACERO ESTRUCTURAL PLANCHA 5/8" kg 100.00% 0.05 10.00 10.00 10.00 10.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
F C2330 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS
F C2330 ACERO ESTRUCTURAL PERFIL C 6"x2"x1/8" kg 100.00% 0.09 161.00 161.00 161.00 161.00
###
F C2330 ACERO ESTRUCTURAL ANGULO 5"x5"x3/8" kg 100.00% 0.09 1.00 1.00 1.00 1.00
###
F C2330 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL DIAGONALES
F C2330 ACERO ESTRUCTURAL PERFIL HSS 3"x3"x3.96mm kg 100.00% 0.09 164.00 164.00 164.00 164.00
###
F C2330 ACERO ESTRUCTURAL PLANCHA 3/8" kg 100.00% 0.06 8.00 8.00 8.00 8.00
###
F C2330 ACERO ESTRUCTURAL PLANCHA 1/2" kg 100.00% 0.06 16.00 16.00 16.00 16.00
###
F C2330 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES
F C2330 ACERO ESTRUCTURAL FIERRO LISO Ø1" kg 100.00% 0.11 64.00 64.00 64.00 64.00
###
F C2330 ACERO ESTRUCTURAL FIERRO LISO Ø5/8" kg 100.00% 0.11 20.00 20.00 20.00 20.00
###
F C2330 ACERO ESTRUCTURAL PLANCHA 1/4" kg 100.00% 0.05 1.00 1.00 1.00 1.00
###
F C2330 SUMINISTRO, INSTALACIÓN DE COBERTURA
F C2330 SUMINISTRO, INSTALACIÓN COBERTURA TR-4 m2 100.00% 0.43 83.00 83.00 83.00 83.00
###
F C2330 SUMINISTRO, INSTALACIÓN DE CUMBRERA
F C2330 SUMINISTRO, INSTALACIÓN DE CUMBRERA TR-4 m 100.00% 0.17 3.00 3.00 3.00 3.00
###
F C2330 INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE
F C2330 ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=3/4" kg 100.00% 0.18 8.00 8.00 8.00 8.00
###
F INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
F C2330 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 100.00% 0.09 62.00 62.00 62.00 62.00
###
F PINTURA ###
F C2330 PINTURA DE ELEMENTOS METALICOS m2 100.00% 0.44 223.00 223.00 223.00 223.00
###
F DISCIPLINA: INSTALACIONES SANITARIAS ###
F TUBERIAS ###
F MONTANTE DE AGUAS DE LLUVIA
F C2340 975-SD-4"-P0E03U-10007
F C2340 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 0.91 9.00 9.00 0.00 0.00
###
F C2340 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
F C2340 975-SD-4"-P0E03U-100018
F C2340 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 0.70 9.00 9.00 0.00 0.00
###
F C2340 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
F MECÁNICA
F CANALETAS DE AGUAS DE LLUVIA
F C2340 ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 80.00% 0.40 14.00 14.00 11.00 11.00
###
F C2340 ACERO ESTRUCTURAL PLANCHA FIERRO GALVANIZADO E=0.8 MM kg 80.00% 0.37 95.00 95.00 76.00 76.00
###
F SOPORTERIA
F C2340 GS1-4", Tubería 975-SD-4"-P0E03U-10007 & 100018 pza 80.00% 3.00 18.00 18.00 14.00 14.00
###
F DISCIPLINA: INSTALACIONES ELÉCTRICAS ###
F SALIDAS PARA ALUMBRADO Y TOMACORRIENTES
F C2360 SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE PHUZION 30 000LM - pto 0.00% 6.07 24.00 24.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
F C2360 SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE CZQ6L B LTP SDRT H pto 0.00% 2.93 6.00 6.00 0.00 0.00
###
F C2360 SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON WATHERPROOF 1286W pto 0.00% 1.76 2.00 2.00 0.00 0.00
###
F C2360 SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON 5462-W pto 0.00% 4.40 26.00 26.00 0.00 0.00
###
F C2360 SUMINISTRO Y MONTAJE DE TOMACORRIENTE INDUSTRIAL MONOFÁSICO 32A MENNEKES 27 pto 0.00% 5.60 6.00 6.00 0.00 0.00
###
F C2360 SUMINISTRO Y MONTAJE DE TOMACORRIENTE INDUSTRIAL TRIFÁSICO 32A MENNEKES 2700 pto 0.00% 5.60 6.00 6.00 0.00 0.00
###
F TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN
F C2360 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1135 UND 0.00% 90.01 90.00 90.00 0.00 0.00
###
F CANALIZACIONES, CONDUCTOS Y TUBERÍAS
F C2360 SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.90 130.00 130.00 0.00 0.00
###
F CONDUCTORES Y CABLES DE ENERGIA
F C2360 SUMINISTRO E INSTALACIÓN DE CABLE 2-1/c #12 AWG + GRD; XHHW-2, 0.6 Kv M 0.00% 0.29 25.00 25.00 0.00 0.00
###
F C2360 SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW-2, 0.6KV M 0.00% 0.29 26.00 26.00 0.00 0.00
###
F C2360 SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #12 AWG + GRD; XHHW-2, 0.6 Kv m 0.00% 1.00 2.00 2.00 0.00 0.00
###
F EQUIPOS ELÉCTRICOS
F C2350 INSTALACIÓN DE EQUIPO 1 ENFARDADOR HORIZONTAL 5.52 KW 440 V TRIFÁSICO EN AL und 0.00% 62.00 62.00 62.00 0.00 0.00
###
F C2350 INSTALACIÓN DE EQUIPO 1 TRITURADOR DE VIDRIOS 1.5 KW 220 V MONOFÁSICO EN AL und 0.00% 19.08 19.00 19.00 0.00 0.00
###
G MÓDULO G: REVEGETACIÓN ###
G - DISCIPLINA: CIVIL ###
G MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS ###
G C2401 EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 6.20 25.00 25.00 25.00 25.00
###
G C2401 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.13 20.00 20.00 20.00 20.00
###
G C2401 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.11 1.00 1.00 1.00 1.00
###
G C2401 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.05 0.00 0.00 0.00 0.00
###
G C2401 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.23 1.00 1.00 1.00 1.00
###
G CONCRETO ARMADO ###
G PEDESTAL
G C2400 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 6.00 6.00 6.00 6.00
###
G C2400 ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 100.00% 2.63 8.00 8.00 8.00 8.00
###
G C2400 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 3.00 3.00 3.00 3.00
###
G LOSA
G C2410 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 216.00 216.00 216.00 216.00
###
G C2410 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 2.47 91.00 91.00 91.00 91.00
###
G C2410 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 149.00 149.00 149.00 149.00
###
G RAMPA
G C2410 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 17.00 17.00 17.00 17.00
###
G C2410 ENCOFRADO CARAVISTA Y DESENCOFRADO DE RAMPA m2 100.00% 2.47 7.00 7.00 7.00 7.00
###
G C2410 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 11.00 11.00 11.00 11.00
###
G CURADO DE CONCRETO CON ADITIVO
G C2410 CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.14 22.00 22.00 22.00 22.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
G SELLADO DE JUNTAS
G C2410 SELLADO DE JUNTA TIPO 1 m 100.00% 0.70 13.00 13.00 13.00 13.00
###
G C2410 SELLADO DE JUNTA TIPO 2 m 100.00% 0.70 13.00 13.00 13.00 13.00
###
G C2410 JUNTA TIPICA EN PEDESTAL m 100.00% 0.53 4.00 4.00 4.00 4.00
###
G BRUÑAS
G C2410 BRUÑADO EN RAMPA m2 100.00% 0.62 5.00 5.00 5.00 5.00
###
G APLICACIÓN DE GROUT E IMPERMEABILIZANTE
G C2420 GROUT PARA PEDESTAL E=2.5CM m2 0.00% 10.94 11.00 11.00 0.00 0.00
###
G ESTRUCTURAS METÁLICAS ###
G DESMONTAJE DE ESTRUCTURAS METALICAS EXISTENTES ###
G C9510 DESMONTAJE DE CONTAINER REUTILIZABLES kg 100.00% 0.03 239.00 239.00 239.00 239.00
###
G C9510 DESMONTAJE COBERTURA DE TR-4 REUTILIZABLES m2 100.00% 0.33 53.00 53.00 53.00 53.00
###
G C9510 DESMONTAJE CERRAMIENTO TR-4 TRANSLUCIDO REUTILIZABLES m2 100.00% 0.33 10.00 10.00 10.00 10.00
###
G C9510 DESMONTAJE DE PANELES DE MALLA GALVANIZADA REUTILIZABLES kg 100.00% 0.08 26.00 26.00 26.00 26.00
###
G C9510 DESMONTAJE DE CORREAS REUTILIZABLES kg 100.00% 0.05 50.00 50.00 50.00 50.00
###
G C9510 DESMONTAJE DE TIJERALES REUTILIZABLES kg 100.00% 0.04 15.00 15.00 15.00 15.00
###
G C9510 DESMONTAJE DE VIGAS DE ARRIOSTRE REUTILIZABLES kg 100.00% 0.03 12.00 12.00 12.00 12.00
###
G C9510 DESMONTAJE DE TEMPLADORES REUTILIZABLES kg 100.00% 0.06 6.00 6.00 6.00 6.00
###
G C9510 DESMONTAJE DE PUERTAS METALICAS REUTILIZABLES kg 100.00% 0.08 11.00 11.00 11.00 11.00
###
G C9510 DESMONTAJE DE COLUMNAS REUTILIZABLES kg 100.00% 0.03 3.00 3.00 3.00 3.00
###
G MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES ###
G C2420 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS REUTILIZABLES kg 0.00% 0.06 5.00 5.00 0.00 0.00
###
G C2420 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES REUTILIZABLES kg 0.00% 0.08 30.00 30.00 0.00 0.00
###
G C2420 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE REUTILIZABLES kg 0.00% 0.06 23.00 23.00 0.00 0.00
###
G C2420 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS REUTILIZABLES kg 0.00% 0.10 105.00 105.00 0.00 0.00
###
G C2420 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES REUTILIZABLES kg 0.00% 0.12 13.00 13.00 0.00 0.00
###
G C2420 INSTALACIÓN E IZAJE DE CONTAINER REUTILIZABLE kg 0.00% 0.06 457.00 457.00 0.00 0.00
###
G C2420 INSTALACIÓN DE PUERTAS METALICAS REUTILIZABLE kg 0.00% 0.11 16.00 16.00 0.00 0.00
###
G C2420 INSTALACIÓN COBERTURA DE TR-4 REUTILIZABLES m2 0.00% 0.43 65.00 65.00 0.00 0.00
###
G C2420 INSTALACIÓN CERRAMIENTO TR-4 TRANSLUCIDO REUTILIZABLES m2 0.00% 0.43 13.00 13.00 0.00 0.00
###
G MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS ###
G C2420 SUMINISTRO, INSTALACIÓN DE CUMBRERA
G C2420 SUMINISTRO, INSTALACIÓN DE CUMBRERA TR-4 m 57.65% 0.17 3.00 3.00 2.00 2.00
###
G INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
G C2420 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 0.00% 0.09 47.00 47.00 0.00 0.00
###
G LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES
G C2420 LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 100.00% 0.50 239.00 239.00 239.00 239.00
###
G PINTURA ###
G C2420 PINTURA DE ELEMENTOS METALICOS m2 50.00% 0.44 209.00 209.00 105.00 105.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
G TRANSPORTE DE ELEMENTOS ESTRUCTURALES ###
G C2420 TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 100.00% 0.02 173.00 173.00 173.00 173.00
###
G DISCIPLINA: INSTALACIONES SANITARIAS ###
G TUBERIAS ###
G MONTANTE DE AGUAS DE LLUVIA
G C2430 975-SD-4"-P0E03U-10005
G C2430 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 1.50 8.00 8.00 0.00 0.00
###
G C2430 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
G C2430 975-SD-4"-P0E03U-10008
G C2430 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 1.25 8.00 8.00 0.00 0.00
###
G C2430 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
G MECÁNICA
G CANALETAS DE AGUAS DE LLUVIA
G C2430 ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 0.00% 0.40 13.00 13.00 0.00 0.00
###
G C2430 ACERO ESTRUCTURAL PLANCHA FIERRO GALVANIZADO E=0.8 MM kg 0.00% 0.37 90.00 90.00 0.00 0.00
###
G SOPORTERIA
G C2430 GS1-4", Tubería 975-SD-4"-P0E03U-10005 & 10008 pza 0.00% 3.00 18.00 18.00 0.00 0.00
###
G DISCIPLINA: INSTALACIONES ELÉCTRICAS ###
G SALIDAS PARA ALUMBRADO Y TOMACORRIENTES
G C2440 ARTEFACTO DE ALUMBRADO LITHONIA LIGHTING FEM L48 8000LM LPPFL WD 90CRI 50K pto 0.00% 7.28 73.00 73.00 0.00 0.00
###
G C2440 SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE CZQ6L B LTP SDRT H pto 0.00% 6.07 24.00 24.00 0.00 0.00
###
G C2440 SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON 1286W pto 0.00% 1.76 7.00 7.00 0.00 0.00
###
G C2440 SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON 5462-W pto 0.00% 4.40 26.00 26.00 0.00 0.00
###
G TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN
G C2440 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1136 UND 0.00% 90.01 90.00 90.00 0.00 0.00
###
G C2440 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-LPA-1184 UND 0.00% 42.66 43.00 43.00 0.00 0.00
###
G C2440 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-LPA-1185 UND 0.00% 42.66 43.00 43.00 0.00 0.00
###
G C2440 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-LPA-1186 UND 0.00% 42.66 43.00 43.00 0.00 0.00
###
G CANALIZACIONES, CONDUCTOS Y TUBERÍAS
G C2440 SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 0.90 106.00 106.00 0.00 0.00
###
G C2440 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 1"Ø m 0.00% 0.82 30.00 30.00 0.00 0.00
###
G CONDUCTORES Y CABLES DE ENERGIA
G C2440 SUMINISTRO E INSTALACIÓN DE CABLE 2-1/c #12 AWG + GRD; XHHW-2, 0.6 Kv m 0.00% 0.29 20.00 20.00 0.00 0.00
###
G C2440 SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW-2, 0.6KV M 0.00% 0.29 34.00 34.00 0.00 0.00
###
H MÓDULO H: ALMACÉN DE HERRAMIENTAS Y EQUIPOS ###
H - DISCIPLINA: CIVIL ###
H MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS ###
H C2601 EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 6.20 19.00 19.00 19.00 19.00
###
H C2601 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.13 12.00 12.00 12.00 12.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
H C2601 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.11 0.00 0.00 0.00 0.00
###
H C2601 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.05 0.00 0.00 0.00 0.00
###
H C2601 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.23 1.00 1.00 1.00 1.00
###
H CONCRETO ARMADO ###
H PEDESTAL
H C2600 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 6.00 6.00 0.00 0.00
###
H C2600 ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 0.00% 2.63 3.00 3.00 0.00 0.00
###
H C2600 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 50.00% 0.12 14.00 14.00 7.00 7.00
###
H LOSA
H C2610 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 140.00 140.00 0.00 0.00
###
H C2610 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 0.00% 2.47 42.00 42.00 0.00 0.00
###
H C2610 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 50.00% 0.12 96.00 96.00 48.00 48.00
###
H SARDINEL
H C2620 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 12.00 12.00 0.00 0.00
###
H C2620 ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 0.00% 2.47 17.00 17.00 0.00 0.00
###
H C2620 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 6.00 6.00 0.00 0.00
###
H CURADO DE CONCRETO CON ADITIVO
H C2610 CURADO DE CONCRETO CON ANTISOL m2 0.00% 0.14 15.00 15.00 0.00 0.00
###
H SELLADO DE JUNTAS
H C2610 SELLADO DE JUNTA TIPO 1 m 0.00% 0.70 13.00 13.00 0.00 0.00
###
H C2610 SELLADO DE JUNTA TIPO 2 m 0.00% 0.70 14.00 14.00 0.00 0.00
###
H C2610 JUNTA TIPICA EN PEDESTAL m 0.00% 0.53 6.00 6.00 0.00 0.00
###
H APLICACIÓN DE GROUT E IMPERMEABILIZANTE
H C2630 GROUT PARA PEDESTAL E=2.5CM m2 0.00% 10.94 11.00 11.00 0.00 0.00
###
H ESTRUCTURAS METÁLICAS ###
H DESMONTAJE DE ESTRUCTURAS METALICAS EXISTENTES ###
H C9520 DESMONTAJE DE CONTAINER REUTILIZABLES kg 100.00% 0.03 129.00 129.00 129.00 129.00
###
H C9520 DESMONTAJE COBERTURA DE TR-4 REUTILIZABLES m2 100.00% 0.33 38.00 38.00 38.00 38.00
###
H C9520 DESMONTAJE DE PANELES DE MALLA GALVANIZADA REUTILIZABLES kg 100.00% 0.08 26.00 26.00 26.00 26.00
###
H C9520 DESMONTAJE DE CORREAS REUTILIZABLES kg 100.00% 0.05 11.00 11.00 11.00 11.00
###
H C9520 DESMONTAJE DE TIJERALES REUTILIZABLES kg 100.00% 0.04 19.00 19.00 19.00 19.00
###
H C9520 DESMONTAJE DE PUERTAS METALICAS REUTILIZABLES kg 100.00% 0.08 6.00 6.00 6.00 6.00
###
H C9520 DESMONTAJE DE COLUMNAS REUTILIZABLES kg 100.00% 0.03 18.00 18.00 18.00 18.00
###
H MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES ###
H C2630 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS REUTILIZABLES kg 0.00% 0.06 44.00 44.00 0.00 0.00
###
H C2630 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES REUTILIZABLES kg 0.00% 0.08 39.00 39.00 0.00 0.00
###
H C2630 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS REUTILIZABLES kg 0.00% 0.10 22.00 22.00 0.00 0.00
###
H C2630 INSTALACIÓN E IZAJE DE CONTAINER REUTILIZABLE kg 0.00% 0.06 248.00 248.00 0.00 0.00
###
H C2630 INSTALACIÓN DE PUERTAS METALICAS REUTILIZABLE kg 0.00% 0.11 9.00 9.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
H C2630 INSTALACIÓN COBERTURA DE TR-4 REUTILIZABLES m2 0.00% 0.43 51.00 51.00 0.00 0.00
###
H C2630 INSTALACIÓN CERRAMIENTO MALLA GALVANIZADA REUTILIZABLES kg 0.00% 0.19 65.00 65.00 0.00 0.00
###
H MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS ###
H C2630 SUMINISTRO, INSTALACIÓN DE PANELES DE MALLA GALVANIZADA
H C2630 ACERO ESTRUCTURAL ANGULO 2 1/2"x2 1/2"x3/16" kg 0.00% 0.12 30.00 30.00 0.00 0.00
###
H C2630 ACERO ESTRUCTURAL PLATINA 1/8"x3/4" kg 0.00% 0.13 3.00 3.00 0.00 0.00
###
H C2630 SUMINISTRO, INSTALACIÓN DE CUMBRERA
H C2630 SUMINISTRO, INSTALACIÓN DE CUMBRERA TR-4 m 57.65% 0.17 2.00 2.00 1.00 1.00
###
H INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
H C2630 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 60.00% 0.09 30.00 30.00 18.00 18.00
###
H LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES
H C2630 LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 100.00% 0.50 168.00 168.00 168.00 168.00
###
H PINTURA ###
H C2630 PINTURA DE ELEMENTOS METALICOS m2 100.00% 0.44 154.00 154.00 154.00 154.00
###
H TRANSPORTE DE ELEMENTOS ESTRUCTURALES ###
H C9520 TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 100.00% 0.02 106.00 106.00 106.00 106.00
###
H DISCIPLINA: INSTALACIONES SANITARIAS ###
H TUBERIAS ###
H MONTANTE DE AGUAS DE LLUVIA
H C2650 975-SD-4"-P0E03U-100014
H C2650 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 0.77 11.00 11.00 0.00 0.00
###
H C2650 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
H C2650 El, 45Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
H C2650 975-SD-4"-P0E03U-100017
H C2650 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 2.16 11.00 11.00 0.00 0.00
###
H C2650 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
H MECÁNICA
H CANALETAS DE AGUAS DE LLUVIA
H C2650 ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 0.00% 0.40 7.00 7.00 0.00 0.00
###
H C2650 ACERO ESTRUCTURAL PLANCHA FIERRO GALVANIZADO E=0.8 MM kg 0.00% 0.37 50.00 50.00 0.00 0.00
###
H SOPORTERIA
H C2650 GS1-4", Tubería 975-SD-4"-P0E03U-100014 & 100017 pza 0.00% 3.00 18.00 18.00 0.00 0.00
###
H DISCIPLINA: INSTALACIONES ELÉCTRICAS ###
H SALIDAS PARA ALUMBRADO Y TOMACORRIENTES
H C2660 ARTEFACTO DE ALUMBRADO LITHONIA LIGHTING FEM L48 8000LM LPPFL WD 90CRI 50K pto 0.00% 7.28 36.00 36.00 0.00 0.00
###
H C2660 SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE CZQ6L B LTP SDRT H pto 0.00% 6.07 18.00 18.00 0.00 0.00
###
H C2660 SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON 1286W pto 0.00% 1.76 5.00 5.00 0.00 0.00
###
H C2660 SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON 5462-W pto 0.00% 4.40 26.00 26.00 0.00 0.00
###
H C2660 SUMINISTRO Y MONTAJE DE TOMACORRIENTE INDUSTRIAL MONOFÁSICO 32A MENNEKES 27 pto 0.00% 5.60 6.00 6.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
H TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN
H C2660 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1137 und 0.00% 90.01 90.00 90.00 0.00 0.00
###
H C2660 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-LPA-1191 UND 0.00% 42.66 43.00 43.00 0.00 0.00
###
H C2660 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-LPA-1189 UND 0.00% 42.66 43.00 43.00 0.00 0.00
###
H C2660 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-LPA-1190 UND 0.00% 42.66 43.00 43.00 0.00 0.00
###
H C2660 SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE 230x330x183mm; A°F° RI
UND 0.00% 1.38 1.00 1.00 0.00 0.00
###
H CANALIZACIONES, CONDUCTOS Y TUBERÍAS
H C2660 SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.76 21.00 21.00 0.00 0.00
###
H C2660 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 1.22 6.00 6.00 0.00 0.00
###
H C2660 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 1"Ø m 0.00% 0.82 17.00 17.00 0.00 0.00
###
H C2660 SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 0.90 75.00 75.00 0.00 0.00
###
H CONDUCTORES Y CABLES DE ENERGIA
H C2660 SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #8AWG+GRD; XHHW-2, 0.6KV M 0.00% 0.29 8.00 8.00 0.00 0.00
###
H C2660 SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW-2, 0.6KV M 0.00% 0.29 30.00 30.00 0.00 0.00
###
H C2660 SUMINISTRO E INSTALACIÓN DE CABLE 2-1/c #12 AWG + GRD; XHHW-2, 0.6 Kv M 0.00% 0.29 12.00 12.00 0.00 0.00
###
H EQUIPOS ELÉCTRICOS
H C2640 SUMINISTRO E INSTALACIÓN DE EQUIPO 1 COMPRESORA 975-CPZ-603 und 0.00% 49.60 50.00 50.00 0.00 0.00
###
I MÓDULO I: ALMACÉN DE CONTROL DE EROSIÓN Y SEDIMENTACIÓN ###
I - DISCIPLINA: CIVIL ###
I MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS ###
I C2700 EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 6.20 37.00 37.00 37.00 37.00
###
I C2700 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.13 15.00 15.00 15.00 15.00
###
I C2700 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.11 1.00 1.00 1.00 1.00
###
I C2700 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.05 1.00 1.00 1.00 1.00
###
I C2700 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.23 2.00 2.00 2.00 2.00
###
I CONCRETO ARMADO ###
I PEDESTAL
I C2710 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 23.00 23.00 0.00 0.00
###
I C2710 ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 0.00% 2.63 16.00 16.00 0.00 0.00
###
I C2710 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 5.00 5.00 0.00 0.00
###
I LOSA
I C2720 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 128.00 128.00 0.00 0.00
###
I C2720 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 0.00% 2.47 35.00 35.00 0.00 0.00
###
I C2720 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 58.71% 0.12 95.00 95.00 56.00 56.00
###
I RAMPA
I C2720 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 23.00 23.00 0.00 0.00
###
I C2720 ENCOFRADO CARAVISTA Y DESENCOFRADO DE RAMPA m2 0.00% 2.47 10.00 10.00 0.00 0.00
###
I C2720 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 18.00 18.00 0.00 0.00
###
I CURADO DE CONCRETO CON ADITIVO
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
I C2720 CURADO DE CONCRETO CON ANTISOL m2 0.00% 0.14 16.00 16.00 0.00 0.00
###
I SELLADO DE JUNTAS
I C2720 SELLADO DE JUNTA TIPO 1 m 0.00% 0.70 11.00 11.00 0.00 0.00
###
I C2720 SELLADO DE JUNTA TIPO 2 m 0.00% 0.70 9.00 9.00 0.00 0.00
###
I C2720 SELLADO DE JUNTA TIPO 3 m 0.00% 0.70 6.00 6.00 0.00 0.00
###
I C2720 JUNTA TIPICA EN PEDESTAL m 0.00% 0.53 4.00 4.00 0.00 0.00
###
I BRUÑAS
I C2720 BRUÑADO EN RAMPA m2 0.00% 0.62 8.00 8.00 0.00 0.00
###
I APLICACIÓN DE GROUT E IMPERMEABILIZANTE
I C2730 GROUT PARA PEDESTAL E=2.5CM m2 0.00% 10.94 11.00 11.00 0.00 0.00
###
I ESTRUCTURAS METÁLICAS ###
I DESMONTAJE DE ESTRUCTURAS METALICAS EXISTENTES ###
I C9530 DESMONTAJE COBERTURA DE CALAMINA GALVANIZADA m2 100.00% 0.33 35.00 35.00 35.00 35.00
###
I C9530 DESMONTAJE DE CORREAS REUTILIZABLES kg 100.00% 0.05 58.00 58.00 58.00 58.00
###
I C9530 DESMONTAJE DE TIJERALES REUTILIZABLES kg 100.00% 0.04 13.00 13.00 13.00 13.00
###
I C9530 DESMONTAJE DE VIGAS DE ARRIOSTRE REUTILIZABLES kg 100.00% 0.03 11.00 11.00 11.00 11.00
###
I C9530 DESMONTAJE DE TEMPLADORES REUTILIZABLES kg 100.00% 0.06 11.00 11.00 11.00 11.00
###
I C9530 DESMONTAJE DE COLUMNAS REUTILIZABLES kg 100.00% 0.03 19.00 19.00 19.00 19.00
###
I MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES ###
I C2730 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS REUTILIZABLES kg 0.00% 0.06 39.00 39.00 0.00 0.00
###
I C2730 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES REUTILIZABLES kg 0.00% 0.08 26.00 26.00 0.00 0.00
###
I C2730 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE REUTILIZABLES kg 0.00% 0.06 19.00 19.00 0.00 0.00
###
I C2730 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS REUTILIZABLES kg 0.00% 0.10 121.00 121.00 0.00 0.00
###
I C2730 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES REUTILIZABLES kg 0.00% 0.12 23.00 23.00 0.00 0.00
###
I C2730 INSTALACIÓN E IZAJE DE COBERTURA DE CALAMINA GALVANIZADA REUTILIZABLE m2 0.00% 0.50 54.00 54.00 0.00 0.00
###
I INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
I C2730 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 0.00% 0.09 12.00 12.00 0.00 0.00
###
I LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES
I C2730 LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 100.00% 0.50 168.00 168.00 168.00 168.00
###
I PINTURA ###
I C2730 PINTURA DE ELEMENTOS METALICOS m2 100.00% 0.44 147.00 147.00 147.00 147.00
###
I TRANSPORTE DE ELEMENTOS ESTRUCTURALES ###
I C9530 TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 100.00% 0.02 46.00 46.00 46.00 46.00
###
I DISCIPLINA: INSTALACIONES SANITARIAS ###
I TUBERIAS ###
I MONTANTE DE AGUAS DE LLUVIA
I C2740 975-SD-4"-P0E03U-100010
I C2740 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 1.07 8.00 8.00 0.00 0.00
###
I C2740 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
I C2740 975-SD-4"-P0E03U-100012
I C2740 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 1.07 8.00 8.00 0.00 0.00
###
I C2740 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
I MECÁNICA
I CANALETAS DE AGUAS DE LLUVIA
I C2740 ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 0.00% 0.41 9.00 9.00 0.00 0.00
###
I C2740 ACERO ESTRUCTURAL PLANCHA FIERRO GALVANIZADO E=0.8 MM kg 0.00% 0.37 66.00 66.00 0.00 0.00
###
I SOPORTERIA
I C2740 GS1-4", Tubería 975-SD-4"-P0E03U-100010 & 100012 pza 0.00% 3.00 18.00 18.00 0.00 0.00
###
K1 MÓDULO K1: SISTEMA DE COLECCIÓN DE LODOS Y GRASAS (1) ###
K1 - DISCIPLINA: CIVIL ###
K1 MOVIMIENTO DE TIERRAS ###
K1 C2501 EXCAVACION MASIVA CON EQUIPO m3 100.00% 1.45 184.00 184.00 184.00 184.00
###
K1 C2501 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.13 28.00 28.00 28.00 28.00
###
K1 C2500 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.16 2.00 2.00 2.00 2.00
###
K1 C2500 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 100.00% 0.04 3.00 3.00 3.00 3.00
###
K1 C2500 MEJORAMIENTO CON MATERIAL GRANULAR m3 100.00% 0.62 6.00 6.00 6.00 6.00
###
K1 C2500 TRANSPORTE DE MATERIAL FINO APTO PARA RELLENO DM < = 1 KM m3 -KM 100.00% 0.16 0.00 0.00 0.00 0.00
###
K1 C2500 TRANSPORTE DE MATERIAL FINO APTO PARA RELLENO DM > 1 KM (Hasta 6.8 Km Ref.) m3 -KM 100.00% 0.04 0.00 0.00 0.00 0.00
###
K1 C2500 MEJORAMIENTO CON MATERIAL FINO DE PRESTAMO m3 100.00% 0.62 1.00 1.00 1.00 1.00
###
K1 C2500 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.11 18.00 18.00 18.00 18.00
###
K1 C2500 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.05 15.00 15.00 15.00 15.00
###
K1 C2500 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.23 37.00 37.00 37.00 37.00
###
K1 CONCRETO ARMADO ###
K1 CONCRETO SIMPLE PARA LOSAS
K1 C2510 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 6.18 25.00 25.00 25.00 25.00
###
K2 CONCRETO ARMADO
K1 LOSA
K1 C2510 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 117.00 117.00 117.00 117.00
###
K1 C2510 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 2.47 82.00 82.00 82.00 82.00
###
K1 C2510 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 207.00 207.00 207.00 207.00
###
K1 MUROS
K1 C2510 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 146.00 146.00 146.00 146.00
###
K1 C2510 ENCOFRADO CARAVISTA Y DESENCOFRADO DE MURO m2 100.00% 3.50 441.00 441.00 441.00 441.00
###
K1 C2510 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 322.00 322.00 322.00 322.00
###
K1 CURADO DE CONCRETO CON ADITIVO
K1 C2510 CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.14 30.00 30.00 30.00 30.00
###
K1 SELLADO DE JUNTAS
K1 C2510 SELLADO DE JUNTA TIPO 3 m 100.00% 0.70 13.00 13.00 13.00 13.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
K1 GEOMEMBRANA Y GEOTEXTIL
K1 C2520 SUMINISTRO E INSTALACION GEOMEMBRANA E=1.5MM m2 0.00% 0.34 6.00 6.00 0.00 0.00
###
K1 C2520 SUMINISTRO E INSTALACION GEODREN TRIPLANAR m2 0.00% 0.51 9.00 9.00 0.00 0.00
###
K1 PINTURA ###
K1 C2510 PINTURA DE LOSA DE CONCRETO m2 0.00% 1.05 25.00 25.00 0.00 0.00
###
K1 CARPINTERIA METALICA ###
K1 C2560 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 0.60m x 0.60m INC. ACCESORIOS und 100.00% 1.50 8.00 8.00 8.00 8.00
###
K1 C2560 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 1.05m x 1.05m INC. ACCESORIOS und 100.00% 2.70 3.00 3.00 3.00 3.00
###
K1 C2560 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 0.70m x 1.30m INC. ACCESORIOS und 100.00% 2.70 3.00 3.00 3.00 3.00
###
K1 C2560 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 0.70m x 0.70m INC. ACCESORIOS und 100.00% 1.59 2.00 2.00 2.00 2.00
###
K1 C2560 SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.305m m 100.00% 1.60 13.00 13.00 13.00 13.00
###
K1 DISCIPLINA: INSTALACIONES SANITARIAS ###
K1 TUBERIAS ###
K1 SISTEMA DE BOMBEO Y DRENES
K1 C2530 INSTALACIÓN DE TUBERÍAS P/SIST. BOMBEO Y ACCESORIOS
K1 C2530 TUBERIA PVC SAP 6" m 0.00% 11.36 27.00 27.00 0.00 0.00
###
K1 C2530 Codo PVC-SAP 6"x90° und 0.00% 0.00 0.00 0.00 0.00 0.00
###
K1 C2530 TEE PVC-SAP 6" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
K1 C2530 TUBERIA HDPE 4" m 0.00% 92.83 27.00 27.00 0.00 0.00
###
K1 C2530 TUBERIA HDPE PERFORADA 4" m 0.00% 3.37 27.00 27.00 0.00 0.00
###
K1 C2530 CODO HDPE 4"x45° und 0.00% 0.00 0.00 0.00 0.00 0.00
###
K1 C2530 YEE HDPE 4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
K1 C2530 TUBERIA PVC SAP 4" m 0.00% 2.14 27.00 27.00 0.00 0.00
###
K1 C2530 NIPLE PVC-SAP 0.20m x 4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
K1 C2530 CODO PVC-SAP 4"x90° und 0.00% 0.00 0.00 0.00 0.00 0.00
###
K1 C2530 TEE PVC-SAP 4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
K1 C2550 INSTALACIÓN DE VÁLVULAS Ø6" Y ACCESORIOS
K1 C2550 VALVULA MARIPOSA DIN 3202 C/PALANCA Ø6" pza 0.00% 15.54 16.00 16.00 0.00 0.00
###
K1 C2550 UNION ADAPTADOR DE BRIDA PARA HDPE Ø6" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
K1 C2550 BRIDA PARA TUBERIA HDPE 6" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
K1 MECÁNICA
K1 EQUIPOS
K1 C2540 SUMINISTRO E INSTALACIÓN DE BOMBA PORTATIL NEUMÁTICA SUMERGIBLE 2.5 HP 975- und 0.00% 15.00 15.00 15.00 0.00 0.00
###
K1 C2540 SUMINISTRO E INSTALACION DE GRUA PORTICO Y TECLE MECANICO und 0.00% 15.00 15.00 15.00 0.00 0.00
###
K2 MÓDULO K2: SISTEMA DE COLECCIÓN DE LODOS Y GRASAS (2) ###
K2 - DISCIPLINA: CIVIL ###
K2 MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS ###
K2 C3300 EXCAVACION MASIVA CON EQUIPO m3 100.00% 1.45 71.00 71.00 71.00 71.00
###
K2 C3300 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.13 12.00 12.00 12.00 12.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
K2 C3311 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.16 1.00 1.00 1.00 1.00
###
K2 C3311 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 100.00% 0.04 1.00 1.00 1.00 1.00
###
K2 C3311 MEJORAMIENTO CON MATERIAL GRANULAR m3 100.00% 0.62 3.00 3.00 3.00 3.00
###
K2 C3311 TRANSPORTE DE MATERIAL FINO APTO PARA RELLENO DM < = 1 KM m3 -KM 100.00% 0.16 0.00 0.00 0.00 0.00
###
K2 C3311 TRANSPORTE DE MATERIAL FINO APTO PARA RELLENO DM > 1 KM (Hasta 6.8 Km Ref.) m3 -KM 100.00% 0.04 0.00 0.00 0.00 0.00
###
K2 C3311 MEJORAMIENTO CON MATERIAL FINO DE PRESTAMO m3 100.00% 0.62 1.00 1.00 1.00 1.00
###
K2 C3311 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.11 7.00 7.00 7.00 7.00
###
K2 C3311 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.05 6.00 6.00 6.00 6.00
###
K2 C3311 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.23 15.00 15.00 15.00 15.00
###
K2 CONCRETO ARMADO ###
K2 CONCRETO SIMPLE PARA LOSAS
K2 C3310 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 6.18 19.00 19.00 19.00 19.00
###
K2 CONCRETO ARMADO
K2 LOSA
K2 C3310 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 58.00 58.00 58.00 58.00
###
K2 C3310 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 85.00 85.00 85.00 85.00
###
K2 MUROS
K2 C3310 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 47.00 47.00 47.00 47.00
###
K2 C3310 ENCOFRADO CARAVISTA Y DESENCOFRADO DE MURO m2 100.00% 3.50 179.00 179.00 179.00 179.00
###
K2 C3310 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 122.00 122.00 122.00 122.00
###
K2 RAMPA
K2 C3310 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 12.00 12.00 12.00 12.00
###
K2 C3310 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 7.00 7.00 7.00 7.00
###
K2 CURADO DE CONCRETO CON ADITIVO
K2 C3310 CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.14 11.00 11.00 11.00 11.00
###
K2 SELLADO DE JUNTAS
K2 C3310 SELLADO DE JUNTA TIPO 1 m 100.00% 0.70 2.00 2.00 2.00 2.00
###
K2 C3310 SELLADO DE JUNTA TIPO 3 m 100.00% 0.70 16.00 16.00 16.00 16.00
###
K2 BRUÑAS
K2 C3310 BRUÑADO EN RAMPA m2 100.00% 0.62 2.00 2.00 2.00 2.00
###
K2 GEOMEMBRANA Y GEOTEXTIL
K2 C3320 SUMINISTRO E INSTALACION GEOMEMBRANA E=1.5MM m2 0.00% 0.34 4.00 4.00 0.00 0.00
###
K2 C3320 SUMINISTRO E INSTALACION GEODREN TRIPLANAR m2 0.00% 0.51 6.00 6.00 0.00 0.00
###
K2 CARPINTERIA METALICA
K2 C3360 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 0.60m x 0.60m INC. ACCESORIOS und 100.00% 1.50 5.00 5.00 5.00 5.00
###
K2 C3360 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 1.05m x 1.05m INC. ACCESORIOS und 100.00% 2.70 3.00 3.00 3.00 3.00
###
K2 C3360 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 1.35m x 0.65m INC. ACCESORIOS und 100.00% 2.45 2.00 2.00 2.00 2.00
###
K2 C3360 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 0.70m x 0.50m INC. ACCESORIOS und 100.00% 1.35 1.00 1.00 1.00 1.00
###
K2 C3360 SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.305m m 100.00% 1.60 2.00 2.00 2.00 2.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
K2 DISCIPLINA: INSTALACIONES SANITARIAS ###
K2 TUBERIAS ###
K2 SISTEMA DE BOMBEO Y DRENES
K2 C3330 INSTALACIÓN DE TUBERÍAS P/SIST. BOMBEO Y ACCESORIOS
K2 C3330 TUBERIA PVC SAP 6" m 0.00% 8.44 17.00 17.00 0.00 0.00
###
K2 C3330 TEE PVC-SAP 6" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
K2 C3330 TUBERIA HDPE 4" m 0.00% 16.88 17.00 17.00 0.00 0.00
###
K2 C3330 TUBERIA HDPE PERFORADA 4" m 0.00% 8.44 17.00 17.00 0.00 0.00
###
K2 C3330 CODO HDPE 4"x90° und 0.00% 0.00 0.00 0.00 0.00 0.00
###
K2 C3330 TUBERIA PVC SAP 4" m 0.00% 2.41 17.00 17.00 0.00 0.00
###
K2 C3330 NIPLE PVC-SAP 0.20m x 4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
K2 C3330 CODO PVC-SAP 4"x90° und 0.00% 0.00 0.00 0.00 0.00 0.00
###
K2 C3330 TEE PVC-SAP 4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
K2 C3350 INSTALACIÓN DE VÁLVULAS Ø6" Y ACCESORIOS
K2 C3350 VALVULA MARIPOSA DIN 3202 C/PALANCA Ø6" pza 0.00% 15.54 16.00 16.00 0.00 0.00
###
K2 C3350 UNION ADAPTADOR DE BRIDA PARA HDPE Ø6" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
K2 C3350 BRIDA PARA TUBERIA HDPE 6" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
L MÓDULO L: RAMPA DEL SISTEMA DE TRANSFERENCIA ###
L - DISCIPLINA: CIVIL ###
L MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS ###
L C3400 EXCAVACIÓN DE ZANJAS P/ESTRUCTURAS m3 0.00% 1.45 410.00 410.00 0.00 0.00
###
L C3400 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.00% 0.13 61.00 61.00 0.00 0.00
###
L C3480 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.16 3.00 3.00 3.00 3.00
###
L C3480 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 100.00% 0.04 4.00 4.00 4.00 4.00
###
L C3480 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 0.00% 2.03 26.00 26.00 0.00 0.00
###
L C3480 MEJORAMIENTO CON MATERIAL GRANULAR m3 0.00% 0.62 39.00 39.00 0.00 0.00
###
L C3480 TRANSPORTE DE MATERIAL FINO APTO PARA RELLENO DM < = 1 KM m3 -KM 0.00% 0.16 1.00 1.00 0.00 0.00
###
L C3480 TRANSPORTE DE MATERIAL FINO APTO PARA RELLENO DM > 1 KM (Hasta 6.8 Km Ref.) m3 -KM 0.00% 0.04 1.00 1.00 0.00 0.00
###
L C3480 MEJORAMIENTO CON MATERIAL FINO DE PRESTAMO m3 0.00% 0.62 2.00 2.00 0.00 0.00
###
L C3480 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.00% 0.11 39.00 39.00 0.00 0.00
###
L C3480 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.00% 0.05 31.00 31.00 0.00 0.00
###
L C3480 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.00% 0.23 79.00 79.00 0.00 0.00
###
L CONCRETO ARMADO ###
L CONCRETO SIMPLE PARA DADOS
L C3410 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 0.00% 6.18 6.00 6.00 0.00 0.00
###
L C3410 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 6.00 6.00 0.00 0.00
###
L CONCRETO SIMPLE PARA LOSAS
L C3410 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 0.00% 6.18 111.00 111.00 0.00 0.00
###
L CONCRETO ARMADO
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
L LOSA PISO
L C3410 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 729.00 729.00 0.00 0.00
###
L C3410 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 0.00% 2.47 376.00 376.00 0.00 0.00
###
L C3410 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 60.00% 0.12 1,600.00 1,600.00 960.00 960.00
###
L LOSA TECHO
L C3410 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% ###
L C3410 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 0.00% ###
L C3410 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% ###
L MUROS
L C3420 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 461.00 461.00 0.00 0.00
###
L C3420 ENCOFRADO CARAVISTA Y DESENCOFRADO DE MURO m2 0.00% 3.50 1,824.00 1,824.00 0.00 0.00
###
L C3420 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 60.00% 0.12 786.00 786.00 472.00 472.00
###
L VEREDA
L C3430 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 47.00 47.00 0.00 0.00
###
L C3430 ENCOFRADO CARAVISTA Y DESENCOFRADO DE VEREDA m2 0.00% 2.47 30.00 30.00 0.00 0.00
###
L C3430 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 60.00% 0.12 25.00 25.00 15.00 15.00
###
L RAMPA
L C3430 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 23.00 23.00 0.00 0.00
###
L C3430 ENCOFRADO CARAVISTA Y DESENCOFRADO DE RAMPA m2 0.00% 2.47 5.00 5.00 0.00 0.00
###
L C3430 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 60.00% 0.12 16.00 16.00 10.00 10.00
###
L CANAL DE DRENAJE
L C3430 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 128.00 128.00 0.00 0.00
###
L C3430 ENCOFRADO CARAVISTA Y DESENCOFRADO DE CANAL DE DRENAJE m2 0.00% 2.80 221.00 221.00 0.00 0.00
###
L C3430 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 60.00% 0.12 169.00 169.00 101.00 101.00
###
L CURADO DE CONCRETO CON ADITIVO
L C3410 CURADO DE CONCRETO CON ANTISOL m2 0.00% 0.14 137.00 137.00 0.00 0.00
###
L SELLADO DE JUNTAS
L C3410 SELLADO DE JUNTA TIPO 1 m 0.00% 0.70 24.00 24.00 0.00 0.00
###
L C3410 SELLADO DE JUNTA TIPO 2 m 0.00% 0.70 2.00 2.00 0.00 0.00
###
L C3410 SELLADO DE JUNTA TIPO 3 m 0.00% 0.70 25.00 25.00 0.00 0.00
###
L BRUÑAS
L C3430 BRUÑADO EN RAMPA m2 0.00% 0.62 82.00 82.00 0.00 0.00
###
L GEOMEMBRANA Y GEOTEXTIL
L C3470 SUMINISTRO E INSTALACION GEOMEMBRANA E=1.5MM m2 0.00% 0.34 21.00 21.00 0.00 0.00
###
L C3470 SUMINISTRO E INSTALACION GEODREN TRIPLANAR m2 0.00% 0.51 31.00 31.00 0.00 0.00
###
L APLICACIÓN DE GROUT E IMPERMEABILIZANTE
L C3440 GROUT PARA PEDESTAL E=2.5CM m2 0.00% 10.94 22.00 22.00 0.00 0.00
###
L CARPINTERIA METALICA
L C3440 SUMINISTRO E INSTALACIÓN DE PUERTA P08 INC. INCACCESORIOS und 60.00% 10.67 11.00 11.00 6.00 6.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
L C3440 SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.50m m 59.54% 2.72 297.00 297.00 177.00 177.00
###
L ESTRUCTURAS METÁLICAS ###
L DESMONTAJE DE ESTRUCTURAS METALICAS EXISTENTES ###
L C9540 DESMONTAJE DE ESCALERA REUTILIZABLE kg 0.00% 0.03 64.00 64.00 0.00 0.00
###
L MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES ###
L C3440 MONTAJE DE ESCALERA REUTILIZABLES kg 0.00% 0.06 125.00 125.00 0.00 0.00
###
L MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS ###
L C3440 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL BARANDAS
L C3440 BARANDA TUBERÍA ESTÁNDAR 1 1/4" kg 60.00% 0.11 44.00 44.00 27.00 27.00
###
L C3440 PARANTE TIPICO DE PLATINA 2 1/2"X1/2" kg 60.00% 0.13 28.00 28.00 17.00 17.00
###
L C3440 TUBO ESTÁNDAR 1 1/2" kg 0.00% 0.11 5.00 5.00 0.00 0.00
###
L C3440 TUBO ESTÁNDAR 2" Ø kg 3.02% 0.09 74.00 74.00 2.00 2.00
###
L C3440 PLATINA 1/4"x90x90 kg 0.00% 0.13 2.00 2.00 0.00 0.00
###
L C3440 GUARDACANTO DE PLANCHA DE 3/16" kg 60.00% 0.09 27.00 27.00 16.00 16.00
###
L C3440 PLANCHA TAPÓN DE 1/8" kg 60.00% 0.09 0.00 0.00 0.00 0.00
###
L C3440 INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE
L C3440 ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=5/8" kg 0.00% 0.18 2.00 2.00 0.00 0.00
###
L INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
L C3440 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 0.00% 0.09 17.00 17.00 0.00 0.00
###
L LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES
L C3440 LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 0.00% 0.50 54.00 54.00 0.00 0.00
###
L PINTURA ###
L C3440 PINTURA DE ELEMENTOS METALICOS m2 0.00% 0.44 66.00 66.00 0.00 0.00
###
L TRANSPORTE DE ELEMENTOS ESTRUCTURALES ###
L C9540 TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 0.00% 0.02 32.00 32.00 0.00 0.00
###
L DISCIPLINA: INSTALACIONES ELÉCTRICAS ###
L SALIDAS PARA ALUMBRADO Y TOMACORRIENTES
L C3460 ARTEFACTO DE ALUMBRADO LITHONIA LIGHTING FEM L48 8000LM LPPFL WD 90CRI 50K pto 0.00% 7.28 7.00 7.00 0.00 0.00
###
L C3460 SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE CZQ6L B LTP SDRT H pto 0.00% 2.93 3.00 3.00 0.00 0.00
###
L C3460 SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON 1286W pto 0.00% 1.76 2.00 2.00 0.00 0.00
###
L C3460 SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON 5462-W pto 0.00% 4.40 9.00 9.00 0.00 0.00
###
L TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN
L C3460 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1138 UND 0.00% 90.01 90.00 90.00 0.00 0.00
###
L C3460 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-COA-961 und 0.00% 60.00 60.00 60.00 0.00 0.00
###
L CANALIZACIONES, CONDUCTOS Y TUBERÍAS
L C3460 SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.76 17.00 17.00 0.00 0.00
###
L C3460 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 1.22 19.00 19.00 0.00 0.00
###
L C3460 SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 0.90 21.00 21.00 0.00 0.00
###
L CONDUCTORES Y CABLES DE ENERGIA
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
L C3460 SUMINISTRO E INSTALACIÓN DE CABLE 2-1/c #12 AWG + GRD; XHHW-2, 0.6 Kv m 0.00% 0.29 2.00 2.00 0.00 0.00
###
L C3460 SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW-2, 0.6KV M 0.00% 0.29 11.00 11.00 0.00 0.00
###
L C3460 SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-4/c #12 AWG + GRD; XHHW-2, 0.6 Kv m 0.00% 1.00 31.00 31.00 0.00 0.00
###
L EQUIPOS ELÉCTRICOS
L C3450 INSTALACIÓN DE EQUIPO 1 SISTEMA DE COMPACTACIÓN CON CAJA DE TRANSFERENCIA 46. und 0.00% 56.36 56.00 56.00 0.00 0.00
###
M MÓDULO M: ALMACÉN DE SUSTANCIAS PELIGROSAS CASETA I ###
M - DISCIPLINA: CIVIL ###
M CONCRETO ARMADO ###
M LOSA
M C4420 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 17.00 17.00 17.00 17.00
###
M C4420 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 2.47 7.00 7.00 7.00 7.00
###
M C4420 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 10.00 10.00 10.00 10.00
###
M CURADO DE CONCRETO CON ADITIVO
M C4420 CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.14 1.00 1.00 1.00 1.00
###
M APLICACIÓN DE GROUT E IMPERMEABILIZANTE
M C4430 GROUT PARA PEDESTAL E=2.5CM m2 0.00% 10.94 11.00 11.00 0.00 0.00
###
M ESTRUCTURAS METÁLICAS ###
M DESMONTAJE DE ESTRUCTURAS METALICAS EXISTENTES ###
M C9550 DESMONTAJE COBERTURA DE CALAMINA GALVANIZADA kg 100.00% 0.16 8.00 8.00 8.00 8.00
###
M C9550 DESMONTAJE DE PANELES DE MALLA GALVANIZADA REUTILIZABLES kg 100.00% 0.08 7.00 7.00 7.00 7.00
###
M C9550 DESMONTAJE DE CORREAS REUTILIZABLES kg 100.00% 0.05 7.00 7.00 7.00 7.00
###
M C9550 DESMONTAJE DE COLUMNAS REUTILIZABLES kg 100.00% 0.03 5.00 5.00 5.00 5.00
###
M MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES ###
M C4430 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS REUTILIZABLES kg 0.00% 0.16 27.00 27.00 0.00 0.00
###
M C4430 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS REUTILIZABLES kg 0.00% 0.08 12.00 12.00 0.00 0.00
###
M C4430 INSTALACIÓN CERRAMIENTO MALLA GALVANIZADA REUTILIZABLES kg 0.00% 0.05 4.00 4.00 0.00 0.00
###
M C4430 INSTALACIÓN E IZAJE DE COBERTURA DE CALAMINA GALVANIZADA REUTILIZABLE m2 0.00% 0.03 0.00 0.00 0.00 0.00
###
M INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
M C4430 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 0.00% 0.16 3.00 3.00 0.00 0.00
###
M LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES
M C4430 LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 57.14% 0.16 13.00 13.00 8.00 8.00
###
M PINTURA ###
M C4430 PINTURA DE ELEMENTOS METALICOS m2 57.14% 0.16 13.00 13.00 8.00 8.00
###
M TRANSPORTE DE ELEMENTOS ESTRUCTURALES ###
M C9550 TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 0.00% 0.16 76.00 76.00 0.00 0.00
###
N MÓDULO N: ALMACÉN DE SUSTANCIAS PELIGROSAS CASETA II ###
N - DISCIPLINA: CIVIL ###
N CONCRETO ARMADO ###
N LOSA
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
N C4500 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 23.00 23.00 23.00 23.00
###
N C4500 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 2.47 7.00 7.00 7.00 7.00
###
N C4500 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 11.00 11.00 11.00 11.00
###
N SARDINEL
N C4500 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 6.00 6.00 0.00 0.00
###
N C4500 ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 0.00% 2.47 12.00 12.00 0.00 0.00
###
N C4500 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 4.00 4.00 0.00 0.00
###
N CURADO DE CONCRETO CON ADITIVO
N C4500 CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.14 3.00 3.00 3.00 3.00
###
N APLICACIÓN DE GROUT E IMPERMEABILIZANTE
N C4510 GROUT PARA PEDESTAL E=2.5CM m2 0.00% 10.94 11.00 11.00 0.00 0.00
###
N ESTRUCTURAS METÁLICAS ###
N DESMONTAJE DE ESTRUCTURAS METALICAS EXISTENTES ###
N C9560 DESMONTAJE DE CORREAS REUTILIZABLES kg 100.00% 0.05 3.00 3.00 3.00 3.00
###
N C9560 DESMONTAJE DE TIJERALES REUTILIZABLES kg 100.00% 0.04 2.00 2.00 2.00 2.00
###
N C9560 DESMONTAJE DE COLUMNAS REUTILIZABLES kg 100.00% 0.03 7.00 7.00 7.00 7.00
###
N MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES ###
N C4510 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS REUTILIZABLES kg 0.00% 0.06 13.00 13.00 0.00 0.00
###
N C4510 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS REUTILIZABLES kg 0.00% 0.10 5.00 5.00 0.00 0.00
###
N C4510 INSTALACIÓN CERRAMIENTO MALLA GALVANIZADA REUTILIZABLES kg 0.00% 0.19 15.00 15.00 0.00 0.00
###
N MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS ###
N C4510 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS
N C4510 ACERO ESTRUCTURAL PLANCHA 1/2" kg 31.50% 0.06 1.00 1.00 0.00 0.00
###
N C4510 SUMINISTRO, INSTALACIÓN DE PANELES DE MALLA GALVANIZADA
N C4510 ACERO ESTRUCTURAL ANGULO 1"x1"x1/8" kg 48.61% 0.12 11.00 11.00 5.00 5.00
###
N C4510 MALLA GALVANIZADA #8 - 2"x2" kg 49.63% 0.23 34.00 34.00 17.00 17.00
###
N C4510 SUMINISTRO, INSTALACIÓN DE COBERTURA
N C4510 SUMINISTRO, INSTALACIÓN COBERTURA TR-4 m2 60.00% 0.43 8.00 8.00 5.00 5.00
###
N INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
N C4510 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 0.00% 0.09 3.00 3.00 0.00 0.00
###
N LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES
N C4510 LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 0.00% 0.50 8.00 8.00 0.00 0.00
###
N PINTURA ###
N C4510 PINTURA DE ELEMENTOS METALICOS m2 0.00% 0.44 38.00 38.00 0.00 0.00
###
N TRANSPORTE DE ELEMENTOS ESTRUCTURALES ###
N C9560 TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 61.60% 0.02 6.00 6.00 4.00 4.00
###
O Y P MÓDULO O Y P: TALLER MECÁNICO Y DE PINTURA SOCIOS ESTRATÉGICOS ###
O Y P - DISCIPLINA: CIVIL ###
O Y P MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS ###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
O Y P C3000 EXCAVACION P/ZAPATAS m3 100.00% 1.53 35.00 35.00 35.00 35.00
###
O Y P C3000 EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 6.20 74.00 74.00 74.00 74.00
###
O Y P C4320 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.13 36.00 36.00 36.00 36.00
###
O Y P C4320 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.16 1.00 1.00 1.00 1.00
###
O Y P C4320 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 100.00% 0.04 1.00 1.00 1.00 1.00
###
O Y P C4320 RELLENO ESTRUCTURAL CON MATERIAL PROPIO SELECCIONADO m3 100.00% 1.78 21.00 21.00 21.00 21.00
###
O Y P C4320 MEJORAMIENTO CON MATERIAL GRANULAR m3 100.00% 0.62 2.00 2.00 2.00 2.00
###
O Y P C4320 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.11 3.00 3.00 3.00 3.00
###
O Y P C4320 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.05 3.00 3.00 3.00 3.00
###
O Y P C4320 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.23 7.00 7.00 7.00 7.00
###
O Y P CONCRETO ARMADO ###
O Y P CONCRETO SIMPLE PARA ZAPATAS
O Y P C4300 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 6.18 12.00 12.00 12.00 12.00
###
O Y P
O Y P ZAPATAS
O Y P C4300 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 52.00 52.00 52.00 52.00
###
O Y P C4300 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 41.00 41.00 41.00 41.00
###
O Y P PEDESTAL
O Y P C4300 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 23.00 23.00 23.00 23.00
###
O Y P C4300 ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 100.00% 2.63 74.00 74.00 74.00 74.00
###
O Y P C4300 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 54.00 54.00 54.00 54.00
###
O Y P LOSA
O Y P C4330 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 338.00 338.00 338.00 338.00
###
O Y P C4330 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 2.47 119.00 119.00 119.00 119.00
###
O Y P C4330 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 285.00 285.00 285.00 285.00
###
O Y P VEREDA
O Y P C4330 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 17.00 17.00 17.00 17.00
###
O Y P C4330 ENCOFRADO CARAVISTA Y DESENCOFRADO DE VEREDA m2 100.00% 2.47 7.00 7.00 7.00 7.00
###
O Y P C4330 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 6.00 6.00 6.00 6.00
###
O Y P RAMPA
O Y P C4330 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 41.00 41.00 41.00 41.00
###
O Y P C4330 ENCOFRADO CARAVISTA Y DESENCOFRADO DE RAMPA m2 100.00% 2.47 37.00 37.00 37.00 37.00
###
O Y P C4330 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 33.00 33.00 33.00 33.00
###
O Y P CANAL DE DRENAJE
O Y P C4330 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 17.00 17.00 17.00 17.00
###
O Y P C4330 ENCOFRADO CARAVISTA Y DESENCOFRADO DE CANAL DE DRENAJE m2 100.00% 2.80 45.00 45.00 45.00 45.00
###
O Y P C4330 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 18.00 18.00 18.00 18.00
###
O Y P SARDINEL
O Y P C4330 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 12.00 12.00 12.00 12.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
O Y P C4330 ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 100.00% 2.47 104.00 104.00 104.00 104.00
###
O Y P C4330 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 38.00 38.00 38.00 38.00
###
O Y P CURADO DE CONCRETO CON ADITIVO
O Y P C4330 CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.14 61.00 61.00 61.00 61.00
###
O Y P SELLADO DE JUNTAS
O Y P C4330 SELLADO DE JUNTA TIPO 1 m 100.00% 0.70 16.00 16.00 16.00 16.00
###
O Y P C4330 SELLADO DE JUNTA TIPO 2 m 100.00% 0.70 27.00 27.00 27.00 27.00
###
O Y P C4330 SELLADO DE JUNTA TIPO 3 m 100.00% 0.70 20.00 20.00 20.00 20.00
###
O Y P C4330 JUNTA TIPICA EN PEDESTAL m 100.00% 0.53 14.00 14.00 14.00 14.00
###
O Y P BRUÑAS
O Y P C4330 BRUÑADO EN RAMPA m2 100.00% 0.62 15.00 15.00 15.00 15.00
###
O Y P APLICACIÓN DE GROUT E IMPERMEABILIZANTE
O Y P C4340 GROUT PARA PEDESTAL E=2.5CM m2 0.00% 10.94 44.00 44.00 0.00 0.00
###
O Y P CARPINTERIA METALICA ###
O Y P C4360 SUMINISTRO E INSTALACIÓN DE PUERTA CORREDIZA P07 INC. RIEL SUP. Y ACCESORIOS und 60.00% 42.00 84.00 84.00 50.00 50.00
###
O Y P C4360 SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.25m m 100.00% 1.36 53.00 53.00 53.00 53.00
###
O Y P ESTRUCTURAS METÁLICAS ###
O Y P MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES ###
O Y P C9570 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS REUTILIZABLES kg 0.00% 0.06 91.00 91.00 0.00 0.00
###
O Y P C9570 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES REUTILIZABLES kg 0.00% 0.08 109.00 109.00 0.00 0.00
###
O Y P C9570 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE REUTILIZABLES kg 0.00% 0.06 14.00 14.00 0.00 0.00
###
O Y P C9570 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES REUTILIZABLES kg 0.00% 0.12 40.00 40.00 0.00 0.00
###
O Y P MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS ###
O Y P C4340 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS
O Y P C4340 ACERO ESTRUCTURAL TUBO 8"x8"x6mm kg 0.00% 0.05 65.00 65.00 0.00 0.00
###
O Y P C4340 ACERO ESTRUCTURAL PLANCHA 3/4" kg 4.27% 0.06 15.00 15.00 1.00 1.00
###
O Y P C4340 ACERO ESTRUCTURAL PLANCHA 1/2" kg 5.84% 0.06 13.00 13.00 1.00 1.00
###
O Y P C4340 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES
O Y P C4340 ACERO ESTRUCTURAL ANGULO 2 1/2"x2 1/2"x3/8" kg 60.00% 0.12 265.00 265.00 159.00 159.00
###
O Y P C4340 ACERO ESTRUCTURAL ANGULO 1"x1"x1/8" kg 60.00% 0.12 2.00 2.00 1.00 1.00
###
O Y P C4340 ACERO ESTRUCTURAL PLANCHA 3/8" kg 3.21% 0.06 20.00 20.00 1.00 1.00
###
O Y P C4340 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE
O Y P C4340 ACERO ESTRUCTURAL TUBO 3"x3"x4.5mm kg 0.00% 0.12 14.00 14.00 0.00 0.00
###
O Y P C4340 ACERO ESTRUCTURAL PLANCHA 1/2" kg 0.00% 0.06 7.00 7.00 0.00 0.00
###
O Y P C4340 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS
O Y P C4340 ACERO ESTRUCTURAL PERFIL C 6"x2"x1/8" kg 67.69% 0.09 418.00 418.00 283.00 283.00
###
O Y P C4340 ACERO ESTRUCTURAL ANGULO L - 3"x1/4" kg 0.00% 0.09 21.00 21.00 0.00 0.00
###
O Y P C4340 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL DIAGONALES
O Y P C4340 ACERO ESTRUCTURAL ANGULO L-2 1/2"x3/16" kg 0.00% 0.12 155.00 155.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
O Y P C4340 ACERO ESTRUCTURAL PLANCHA 3/8" kg 0.00% 0.06 9.00 9.00 0.00 0.00
###
O Y P C4340 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VENTANAS
O Y P C4340 ACERO ESTRUCTURAL ANGULO 2"x2"x1/8" kg 0.00% 0.12 2.00 2.00 0.00 0.00
###
O Y P C4340 ACERO ESTRUCTURAL PLANCHA 3/8" kg 0.00% 0.06 1.00 1.00 0.00 0.00
###
O Y P C4340 ACERO ESTRUCTURAL ANGULO 1 1/2"x1 1/2"x1/8" kg 0.00% 0.12 1.00 1.00 0.00 0.00
###
O Y P C4340 SUMINISTRO, INSTALACIÓN DE COBERTURA
O Y P C4340 SUMINISTRO, INSTALACIÓN COBERTURA TR-4 m2 59.66% 0.43 122.00 122.00 73.00 73.00
###
O Y P C4340 SUMINISTRO, INSTALACIÓN COBERTURA TR-4 TRANSLUCIDO m2 73.65% 0.43 4.00 4.00 3.00 3.00
###
O Y P C4340 SUMINISTRO, INSTALACIÓN DE CERRAMIENTO
O Y P C4340 SUMINISTRO, INSTALACIÓN CERRAMIENTO TR-4 m2 59.44% 0.43 217.00 217.00 129.00 129.00
###
O Y P C4340 SUMINISTRO, INSTALACIÓN DE CUMBRERA
O Y P C4340 SUMINISTRO, INSTALACIÓN DE CUMBRERA TR-4 m 57.65% 0.17 2.00 2.00 1.00 1.00
###
O Y P C4340 SUMINISTRO, INSTALACIÓN DE ESQUINEROS
O Y P C4340 SUMINISTRO, INSTALACIÓN ESQUINEROS TR-4 m 57.65% 0.17 4.00 4.00 2.00 2.00
###
O Y P C4340 SUMINISTRO, INSTALACIÓN REMATES
O Y P C4340 SUMINISTRO, INSTALACIÓN REMATES TR-4 m 65.28% 0.17 13.00 13.00 8.00 8.00
###
O Y P C4340 INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE
O Y P C4340 ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=3/4" kg 60.00% 0.18 13.00 13.00 8.00 8.00
###
O Y P INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE
O Y P C4340 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 0.00% 0.09 66.00 66.00 0.00 0.00
###
O Y P LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES
O Y P C4340 LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 91.00% 0.50 83.00 83.00 76.00 76.00
###
O Y P PINTURA ###
O Y P C4340 PINTURA DE ELEMENTOS METALICOS m2 91.00% 0.44 344.00 344.00 313.00 313.00
###
O Y P TRANSPORTE DE ELEMENTOS ESTRUCTURALES ###
O Y P C9570 TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 75.00% 0.02 59.00 59.00 44.00 44.00
###
O Y P DISCIPLINA: INSTALACIONES SANITARIAS ###
O Y P TUBERIAS ###
O Y P MONTANTE DE AGUAS DE LLUVIA
O Y P C4370 975-SD-4"-P0E03U-100022
O Y P C4370 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 0.99 9.00 9.00 0.00 0.00
###
O Y P C4370 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
O Y P C4370 975-SD-4"-P0E03U-100023
O Y P C4370 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 0.69 9.00 9.00 0.00 0.00
###
O Y P C4370 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
O Y P MECÁNICA
O Y P CANALETAS DE AGUAS DE LLUVIA
O Y P C4370 ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 65.26% 0.41 9.00 9.00 6.00 6.00
###
O Y P C4370 ACERO ESTRUCTURAL PLANCHA DE F°G° 0.8MM kg 65.28% 0.37 66.00 66.00 43.00 43.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
O Y P SOPORTERIA
O Y P C4370 GS1-4", Tubería 975-SD-4"-P0E03U-100022 & 100023 pza 0.00% 3.00 18.00 18.00 0.00 0.00
###
O Y P DISCIPLINA: INSTALACIONES ELÉCTRICAS ###
O Y P SALIDAS PARA ALUMBRADO Y TOMACORRIENTES
O Y P C4380 ARTEFACTO DE ALUMBRADO LITHONIA LIGHTING FEM L48 8000LM LPPFL WD 90CRI 50K pto 0.00% 7.28 58.00 58.00 0.00 0.00
###
O Y P C4380 SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE PHUZION 30 000LM - pto 0.00% 6.07 42.00 42.00 0.00 0.00
###
O Y P C4380 SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE CZQ6L B LTP SDRT H pto 0.00% 6.07 24.00 24.00 0.00 0.00
###
O Y P C4380 SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON 1286W pto 0.00% 1.76 5.00 5.00 0.00 0.00
###
O Y P C4380 SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON 5462-W pto 0.00% 4.40 18.00 18.00 0.00 0.00
###
O Y P C4380 SUMINISTRO Y MONTAJE DE TOMACORRIENTE INDUSTRIAL MONOFÁSICO 32A MENNEKES 27 pto 0.00% 5.60 11.00 11.00 0.00 0.00
###
O Y P TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN
O Y P C4380 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1139 UND 0.00% 90.01 90.00 90.00 0.00 0.00
###
O Y P C4380 SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE 230x330x183mm; A°F° RI
UND 0.00% 1.38 3.00 3.00 0.00 0.00
###
O Y P CANALIZACIONES, CONDUCTOS Y TUBERÍAS
O Y P C4380 SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 0.90 269.00 269.00 0.00 0.00
###
O Y P C4380 SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.90 1.00 1.00 0.00 0.00
###
O Y P CONDUCTORES Y CABLES DE ENERGIA
O Y P C4380 SUMINISTRO E INSTALACIÓN DE CABLE 2-1/c #12 AWG + GRD; XHHW-2, 0.6 Kv M 0.00% 0.29 55.00 55.00 0.00 0.00
###
O Y P C4380 SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW-2, 0.6KV M 0.00% 0.29 53.00 53.00 0.00 0.00
###
O Y P EQUIPOS ELÉCTRICOS
O Y P C4350 INSTALACIÓN DE EQUIPO 1 DESENLLANTADORA 1.32 KW 220 V MONOFÁSICO EN TALLER und 0.00% 62.00 62.00 62.00 0.00 0.00
###
O Y P C4350 INSTALACIÓN DE EQUIPO 1 COMPRESORA 01 1.32 KW 220 V MONOFÁSICO EN TALLER MEC und 0.00% 62.00 124.00 124.00 0.00 0.00
###
R MÓDULO R: SERVICIOS HIGIÉNICOS ###
R - DISCIPLINA: CIVIL ###
R MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS ###
R C4700 EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 6.20 6.00 6.00 6.00 6.00
###
R C4700 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.13 1.00 1.00 1.00 1.00
###
R C4700 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.11 0.00 0.00 0.00 0.00
###
R C4700 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.05 0.00 0.00 0.00 0.00
###
R C4700 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.23 0.00 0.00 0.00 0.00
###
R CONCRETO SIMPLE ###
R CONCRETO SIMPLE PARA DADOS
R C4710 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 6.18 6.00 6.00 6.00 6.00
###
R C4710 ENCOFRADO CARAVISTA Y DESENCOFRADO DE DADO DE CONCRETO m2 100.00% 2.47 7.00 7.00 7.00 7.00
###
R C4710 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 12.00 12.00 12.00 12.00
###
R CONCRETO SIMPLE PARA PELDAÑOS
R C4710 ENCOFRADO CARAVISTA Y DESENCOFRADO DE PELDAÑOS m2 0.00% 2.47 5.00 5.00 0.00 0.00
###
R C4710 COLOCACIÓN DE CONCRETO F'c=20 MPa m3 0.00% 6.18 6.00 6.00 0.00 0.00
###
R CURADO DE CONCRETO CON ADITIVO
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
R C4710 CURADO DE CONCRETO CON ANTISOL m2 80.00% 0.14 1.00 1.00 1.00 1.00
###
R ESTRUCTURAS METÁLICAS ###
R DESMONTAJE DE ESTRUCTURAS METALICAS EXISTENTES ###
R C9580 DESMONTAJE DE CONTAINER REUTILIZABLES kg 0.00% 0.03 97.00 97.00 0.00 0.00
###
R MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES ###
R C4720 INSTALACIÓN E IZAJE DE CONTAINER REUTILIZABLE kg 0.00% 0.06 186.00 186.00 0.00 0.00
###
R PINTURA ###
R C4720 PINTURA DE ELEMENTOS METALICOS m2 0.00% 0.44 63.00 63.00 0.00 0.00
###
R TRANSPORTE DE ELEMENTOS ESTRUCTURALES ###
R C9580 TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 0.00% 0.02 55.00 55.00 0.00 0.00
###
R DISCIPLINA: INSTALACIONES ELÉCTRICAS ###
R SALIDAS PARA ALUMBRADO Y TOMACORRIENTES
R C4730 SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE CZQ6L B LTP SDRT H pto 0.00% 2.93 6.00 6.00 0.00 0.00
###
R TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN
R C4730 DESMONTAJE Y MONTAJE DE TABLERO ELÉCTRICO 975-LPA-1202 und 0.00% 73.60 74.00 74.00 0.00 0.00
###
R CANALIZACIONES, CONDUCTOS Y TUBERÍAS
R C4730 SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 0.90 14.00 14.00 0.00 0.00
###
R CONDUCTORES Y CABLES DE ENERGIA
R C4730 SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW-2, 0.6KV M 0.00% 0.29 5.00 5.00 0.00 0.00
###
R EQUIPOS ELÉCTRICOS
R C4730 INSTALACIÓN DE EQUIPO 1 THERMA ELECTRICA 2 KW 220 V EN SERVICIOS HIGIENICOS und 0.00% 8.80 9.00 9.00 0.00 0.00
###
S MÓDULO S: CISTERNA ###
S - DISCIPLINA: CIVIL ###
S MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS ###
S C4600 EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 6.20 155.00 155.00 155.00 155.00
###
S C4600 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.13 6.00 6.00 6.00 6.00
###
S C4611 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.16 0.00 0.00 0.00 0.00
###
S C4611 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 100.00% 0.04 0.00 0.00 0.00 0.00
###
S C4611 MEJORAMIENTO CON MATERIAL GRANULAR m3 100.00% 0.62 1.00 1.00 1.00 1.00
###
S C4611 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.11 4.00 4.00 4.00 4.00
###
S C4611 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.05 3.00 3.00 3.00 3.00
###
S C4611 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.23 8.00 8.00 8.00 8.00
###
S CONCRETO SIMPLE ###
S CONCRETO SIMPLE PARA ZAPATAS
S C4610 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 6.18 12.00 12.00 12.00 12.00
###
S CONCRETO SIMPLE PARA LOSAS DE EQUIPOS
S C4610 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 6.00 6.00 6.00 6.00
###
S C4610 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA PARA EQUIPOS m2 100.00% 2.47 2.00 2.00 2.00 2.00
###
S CURADO DE CONCRETO CON ADITIVO
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
S C4610 CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.14 0.00 0.00 0.00 0.00
###
S
S LOSA
S C4610 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 41.00 41.00 41.00 41.00
###
S C4610 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 2.47 17.00 17.00 17.00 17.00
###
S C4610 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 34.00 34.00 34.00 34.00
###
S MUROS
S C4610 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 35.00 35.00 35.00 35.00
###
S C4610 ENCOFRADO CARAVISTA Y DESENCOFRADO DE MURO m2 100.00% 3.50 70.00 70.00 70.00 70.00
###
S C4610 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 26.00 26.00 26.00 26.00
###
S CANAL DE DRENAJE
S C4610 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 6.00 6.00 6.00 6.00
###
S C4610 ENCOFRADO CARAVISTA Y DESENCOFRADO DE CANAL DE DRENAJE m2 100.00% 2.80 6.00 6.00 6.00 6.00
###
S C4610 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 3.00 3.00 3.00 3.00
###
S CURADO DE CONCRETO CON ADITIVO
S C4610 CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.14 5.00 5.00 5.00 5.00
###
S SELLADO DE JUNTAS
S C4610 SELLADO DE JUNTA TIPO 3 m 100.00% 0.70 2.00 2.00 2.00 2.00
###
S CARPINTERIA METALICA ###
S C4670 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 0.65m x 0.65m INC. ACCESORIOS und 100.00% 1.50 2.00 2.00 2.00 2.00
###
S ESTRUCTURAS METÁLICAS
S MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS ###
S C4670 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS
S C4670 ACERO ESTRUCTURAL TUBO 3"x1 1/2"x4.5mm kg 42.87% 0.12 17.00 17.00 7.00 7.00
###
S C4670 ACERO ESTRUCTURAL PLANCHA 1/2" kg 39.20% 0.06 1.00 1.00 0.00 0.00
###
S C4670 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES
S C4670 ACERO ESTRUCTURAL TUBO 3"x1 1/2"x4.5mm kg 0.00% 0.12 10.00 10.00 0.00 0.00
###
S C4670 ACERO ESTRUCTURAL ANGULO L-3"x3"x3/16" kg 49.65% 0.12 0.00 0.00 0.00 0.00
###
S C4670 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE
S C4670 ACERO ESTRUCTURAL TUBO 3"x1 1/2"x4.5mm kg 0.00% 0.12 17.00 17.00 0.00 0.00
###
S C4670 SUMINISTRO, INSTALACIÓN DE PANELES DE MALLA GALVANIZADA
S C4670 ACERO ESTRUCTURAL TUBO 1 1/2"x3/16" kg 0.00% 0.12 6.00 6.00 0.00 0.00
###
S C4670 MALLA GALVANIZADA #8 - 2"x2" kg 54.79% 0.23 26.00 26.00 14.00 14.00
###
S C4670 SUMINISTRO, INSTALACIÓN DE COBERTURA
S C4670 SUMINISTRO, INSTALACIÓN COBERTURA TR-4 m2 59.66% 0.43 5.00 5.00 3.00 3.00
###
S INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
S C4670 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 0.00% 0.09 3.00 3.00 0.00 0.00
###
S PINTURA ###
S C4670 PINTURA DE ELEMENTOS METALICOS m2 60.00% 0.44 32.00 32.00 19.00 19.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
S DISCIPLINA: INSTALACIONES SANITARIAS ###
S TUBERIAS ###
S 975-DW-2"-S1E0P-10002 / 10004
S C4650 Pipe, A312TP316*, SMLS, Sch40S, PE, ø2" m 0.00% 10.00 50.00 50.00 0.00 0.00
###
S C4650 Vlv-Chk, SpLPstn, A182F316L, CL800, SW, B16.34, BC, Trm12, Con canastilla, ø2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 El, 90Deg, SW, A192F316L, CL3000, ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 Union, SW, A182F316L, CL3000, ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S 975-DW-2"-G1E0V-10003 / 10005
S C4650 Pipe, A53-B-S, SMLS, StdWt, T&C, ø2" m 0.00% 25.58 56.00 56.00 0.00 0.00
###
S C4650 Union, FNPT, A197, CL3000, ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 EXPANSION JOINT, CHLOROBUTYL / POLYESTER, CL300, ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 Vlv-Chk, SpLPstn, A182F316L, CL800, SW, B16.34, BC, Trm12, ø2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 FlgSW, A182-F316*, CL150, Sch40S, RF, StdF, B16.5, ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 El, 90Deg, FNPT, A197, CL300 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S 975-DW-2"-G1E0V-10006
S C4650 Pipe, A53-B-S, SMLS, StdWt, T&C, ø2" m 0.00% 10.87 38.00 38.00 0.00 0.00
###
S C4650 Te, FNPT. A197, CL300, ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 El, 90Deg, FNPT, A197, CL300 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 Thredolet, A105, CL3000, ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 RedTe, FNPT, A197, CL300, ø2"x3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 RedTe, FNPT, A197, CL300, ø2"x1 1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 FlgSW, A182-F316*, CL150, Sch40S, RF, StdF, B16.5, ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S 975-DW-2"-G1E0V-10007 / 10008
S C4650 Pipe, A53-B-S, SMLS, StdWt, T&C, ø2" m 0.00% 17.86 25.00 25.00 0.00 0.00
###
S C4650 El, 90Deg, FNPT, A197, CL300 ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 RedTe, FNPT, A197, CL300, ø2"x1 1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 Union, FNPT, A197, CL3000, ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 FlgSW, A182-F316*, CL150, Sch40S, RF, StdF, B16.5, ø2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S 975-DW-2"-G1E0V-10009
S C4650 Pipe, A53-B-S, SMLS, StdWt, T&C,ø3/4" m 0.00% 118.33 12.00 12.00 0.00 0.00
###
S C4650 REDUCTOR MACHO NPT DE 1/2" A 3/4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 CONECTOR T 1/2" NPT, CON ROSCA INTERNA und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 CONECTOR HEMBRA NPT 1/2" O.D. x 1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 NIPLE CORTO DE 1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 CODO DE 90º NPT DE 1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 VÁLVULA DE BOLA 1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
S C4650 VÁLVULA DE BOLA 3/4" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 TAPÓN HEXAGONAL ROSCADO DE 1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 PRESOSTATO MECÁNICO - FUELLE 1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 MANOMETRO DE 4 1/2" DE DIAL CON LECTURA DIRECTA und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S 975-DW-1 1/2"-G1E0V-100010
S C4650 Pipe, A53-B-S, SMLS, StdWt, T&C,ø1 1/2" m 0.00% 11.09 18.00 18.00 0.00 0.00
###
S C4650 Union, FNPT, A197, CL3000, ø1 1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 El, 90Deg, FNPT, A197, CL300, ø1 1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 Te, FNPT. A197, CL300, ø1 1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 VALVULA DE ALIVIO, ø1 1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S 975-DW-1 1/2"-G1E0V-100011
S C4650 Pipe, A53-B-S, SMLS, StdWt, T&C,ø1 1/2" m 0.00% 7.56 6.00 6.00 0.00 0.00
###
S C4650 Union, FNPT, A197, CL3000, ø1 1/2" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
S C4650 Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO,ø1 1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
S 975-DW-1 1/2"-G1E0V-100012
S C4650 Pipe, A53-B-S, SMLS, StdWt, T&C,ø1 1/2" m 0.00% 8.44 7.00 7.00 0.00 0.00
###
S C4650 Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO,ø1 1/2" pza 0.00% 0.00 0.00 0.00 0.00 0.00
###
S MECÁNICA
S SOPORTERIA
S C4650 GA-GS13-2" pza 0.00% 2.67 16.00 16.00 0.00 0.00
###
S C4650 GA-GS13-1 1/2" pza 0.00% 4.00 8.00 8.00 0.00 0.00
###
S PINTURA ###
S C4650 PINTURA DE TUBERIAS m2 0.00% 1.50 5.00 5.00 0.00 0.00
###
S EQUIPOS
S C4640 SUMINISTRO E INSTALACION DE ELECTROBOMBA 1.5 HP, INCLUYE ACCESORIOS EN CISTE und 0.00% 11.25 23.00 23.00 0.00 0.00
###
S C4640 SUMINISTRO E INSTALACIÓN DE TANQUE HIDRONEUMÁTICO DE 62 GAL. - 975-VSW-003 / 97 und 0.00% 11.25 23.00 23.00 0.00 0.00
###
S DISCIPLINA: INSTALACIONES ELÉCTRICAS ###
S SALIDAS PARA ALUMBRADO Y TOMACORRIENTES
S C4680 ARTEFACTO DE ALUMBRADO LITHONIA LIGHTING FEM L48 8000LM LPPFL WD 90CRI 50K pto 0.00% 7.28 7.00 7.00 0.00 0.00
###
S C4680 SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE CZQ6L B LTP SDRT H pto 0.00% 2.93 3.00 3.00 0.00 0.00
###
S C4680 SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON 1286W pto 0.00% 1.76 2.00 2.00 0.00 0.00
###
S C4680 SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON 5462-W pto 0.00% 4.40 4.00 4.00 0.00 0.00
###
S TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN
S C4680 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1150 und 0.00% 90.01 90.00 90.00 0.00 0.00
###
S C4680 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-COA-959 und 0.00% 60.00 60.00 60.00 0.00 0.00
###
S CANALIZACIONES, CONDUCTOS Y TUBERÍAS
S C4680 SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.80 41.00 41.00 0.00 0.00
###
S C4680 SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 0.90 60.00 60.00 0.00 0.00
###
S CONDUCTORES Y CABLES DE ENERGIA
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
S C4680 SUMINISTRO E INSTALACIÓN DE CABLE TIPO 2-1/C #12 AWG+GRD; XHHW-2, 0.6KV M 0.00% 0.29 4.00 4.00 0.00 0.00
###
S C4680 SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW-2, 0.6KV M 0.00% 0.29 10.00 10.00 0.00 0.00
###
S C4680 SUMINISTRO E INSTALACIÓN DE CABLE 1-3/c #12 AWG + GRD, XHHW-2, 0.6Kv m 0.00% 0.29 11.00 11.00 0.00 0.00
###
S SISTEMA DE BOMBEO
S C4680 INSTALACION ELETRICA DE SISTEMA DE BOMBEO GLB 0.00% 1.00 1.00 1.00 0.00 0.00
###
S DISCIPLINA: INSTRUMENTACIÓN Y CONTROL ###
S C4660 INSTRUMENTACIÓN Y CONTROL DE ELECTROBOMBA Y TANQUE HIDRONEUMATICO GLB 0.00% 1.00 1.00 1.00 0.00 0.00
###
SI&E SEÑALIZACION INTERNA Y EXTERNA ###
SI&E - DISCIPLINA: CIVIL ###
SI&E MOVIMIENTO DE TIERRAS PARA SEÑALIZACIÓN EXTERNA ###
SI&E C5800 EXCAVACION PARA DADOS DE ANCLAJE m3 0.00% 6.20 87.00 87.00 0.00 0.00
###
SI&E C5800 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.00% 0.13 18.00 18.00 0.00 0.00
###
SI&E C5800 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 0.00% 0.16 2.00 2.00 0.00 0.00
###
SI&E C5800 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 0.00% 0.04 2.00 2.00 0.00 0.00
###
SI&E C5800 RELLENO CON PIEDRA CHANCADA 3/4" m3 0.00% 1.78 16.00 16.00 0.00 0.00
###
SI&E C5800 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.00% 0.11 2.00 2.00 0.00 0.00
###
SI&E C5800 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.00% 0.05 2.00 2.00 0.00 0.00
###
SI&E C5800 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.00% 0.23 4.00 4.00 0.00 0.00
###
SI&E CONCRETO SIMPLE ###
SI&E CONCRETO SIMPLE PARA DADOS
SI&E C5810 COLOCACIÓN DE CONCRETO F'c=10 MPa m3 0.00% 6.18 86.00 86.00 0.00 0.00
###
SI&E C5810 ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 2.47 7.00 7.00 0.00 0.00
###
SI&E MANTENIMIENTO, TRASLADO Y REUBICACIÓN
SI&E C5830 MANTENIMIENTO, TRASLADO Y REUBICACIÓN DE LETREROS GLB 0.00% 31.00 31.00 31.00 0.00 0.00
###
SI&E C5830 MANTENIMIENTO, TRASLADO Y REUBICACIÓN DE CILINDROS DE CONCRETO GLB 0.00% 31.00 31.00 31.00 0.00 0.00
###
SI&E C5830 MANTENIMIENTO, TRASLADO Y REUBICACIÓN DE JARDINERAS GLB 0.00% 31.00 31.00 31.00 0.00 0.00
###
SI&E SEÑALIZACION INTERNA
SI&E C5830 SUMINISTRO E INSTALACIÓN DE SEÑALIZACIÓN INTERNA EN TALLER MECÁNICO Y DE PINT GLB 0.00% 31.00 31.00 31.00 0.00 0.00
###
SI&E C5830 SUMINISTRO E INSTALACIÓN DE SEÑALIZACIÓN EN PUNTO DE REUNIÓN EN CASO DE EMER GLB 0.00% 16.00 16.00 16.00 0.00 0.00
###
SI&E CARPINTERIA
SI&E C5830 SUMINISTRO E INSTALACIÓN DE POSTES DE MADERA DE 4"x4" p2 0.00% 0.30 164.00 164.00 0.00 0.00
###
SI&E ESTRUCTURAS METÁLICAS
SI&E SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL SEÑALIZACIÓN EXTERNA
SI&E C5820 TUBERIA DE FIERRO GALVANIZADO 2.5" Ø SCH 40 kg 0.00% 0.08 41.00 41.00 0.00 0.00
###
SI&E C5820 ACERO ESTRUCTURAL TUBO DE 4"x4"x3mm kg 0.00% 0.12 25.00 25.00 0.00 0.00
###
SI&E C5820 ACERO ESTRUCTURAL PLANCHA DE 3/16" kg 0.00% 0.06 48.00 48.00 0.00 0.00
###
SI&E INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
SI&E C5820 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 0.00% 0.08 6.00 6.00 0.00 0.00
###
SI&E PINTURA ###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
SI&E C5820 PINTURA DE ELEMENTOS METALICOS m2 60.00% 0.08 3.00 3.00 2.00 2.00
###
INSTALACIONES ELECTRICAS EXTERNAS ###
AEL23KV ACOMETIDA ELECTRICA DESDE LINEA 23KV A SUB ESTACIÓN (LÍNEA AÉREA) ###
AEL23KV - DISCIPLINA: CIVIL ###
AEL23KV MOVIMIENTO DE TIERRAS ###
AEL23KV EXCAVACION DE HOYO P/CIMIENTO DE POSTE 90 PIES m3 100.00% 6.20 322.00 616.00 322.00 616.00
###
AEL23KV EXCAVACION DE HOYO P/RETENIDA INCLINADA DOBLE m3 100.00% 6.20 118.00 195.00 118.00 195.00
###
AEL23KV EXCAVACION DE ZANJA PARA TENDIDO DE CABLE m3 100.00% 6.20 428.00 484.00 428.00 484.00
###
AEL23KV TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.16 10.00 4.00 10.00 4.00
###
AEL23KV TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 100.00% 0.04 14.00 2.00 14.00 2.00
###
AEL23KV RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 100.00% 1.78 89.00 164.00 89.00 164.00
###
AEL23KV RELLENO ESTRUCTURAL CON MATERIAL PROPIO SELECCIONADO m3 100.00% 1.78 122.00 482.00 122.00 482.00
###
AEL23KV ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.11 10.00 10.00 10.00 10.00
###
AEL23KV ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.05 8.00 38.00 8.00 38.00
###
AEL23KV APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.23 21.00 64.00 21.00 64.00
###
AEL23KV CONCRETO SIMPLE ###
AEL23KV COLOCACIÓN DE CONCRETO F'c=10 MPa m3 100.00% 6.18 12.00 17.00 12.00 17.00
###
AEL23KV DISCIPLINA: INSTALACIONES ELÉCTRICAS ###
AEL23KV SUMINISTRO E INSTALACIÓN DE POSTES DE MADERA
AEL23KV C5310 SUMINISTRO Y DESCARGO DE POTES DE MADERA DE 90PIES und 100.00% 2.80 11.00 11.00 11.00 11.00
###
AEL23KV C5310 TRASLADO DE POSTE DE MADERA DE 90PIES DE ALMACEN A PUNTO DE IZAJE und 100.00% 25.92 104.00 104.00 104.00 104.00
###
AEL23KV C5310 IZAJE DE POSTE DE MADERA DE 90 PIES und 100.00% 10.40 42.00 42.00 42.00 42.00
###
AEL23KV C5310 ROTULADO Y CODIFICADO DE POSTES MADERA MEDIA TENSION (Inc. Torulado, Sela. Pat. y Pe und 42.86% 3.68 15.00 15.00 6.00 6.00
###
AEL23KV SUMINISTRO Y MONTAJE DE ARMADOS
AEL23KV C5310 SUMINISTRO Y MONTAJE DE ARMADO - PUNTO ALIMENTACION und 100.00% 56.00 56.00 56.00 56.00 56.00
###
AEL23KV C5310 SUMINISTRO Y MONTAJE DE ARMADO - TIPO PR und 100.00% 18.66 19.00 19.00 19.00 19.00
###
AEL23KV C5310 SUMINISTRO Y MONTAJE DE ARMADO - TIPO PS und 100.00% 18.66 37.00 37.00 37.00 37.00
###
AEL23KV C5310 SUMINISTRO Y MONTAJE DE ARMADO - TERMINAL und 100.00% 56.00 56.00 56.00 56.00 56.00
###
AEL23KV C5310 SUMINISTRO E INSTALACIÓN DE LOAD BREAKER SWICH 38KV, 200KVBIL, 1200A EN TERMIN und 100.00% 40.00 40.00 40.00 40.00 40.00
###
AEL23KV PUESTA A TIERRA DE POSTES DE ENERGIA ELECTRICA
AEL23KV C5330 PUESTA A TIERRA DE POSTES DE ENERGIA ELECTRICA und 100.00% 14.60 58.00 58.00 58.00 58.00
###
AEL23KV SUMINISTRO Y MONTAJE DE CONDUCTORES
AEL23KV C5340 SUMINISTRO, TENDIDO Y PUESTA A FLECHA DE CABLES AAAC 3 x 240mm2 m 0.00% 0.54 337.00 337.00 0.00 0.00
###
AEL23KV C5340 SUMINISTRO, TENDIDO Y PUESTA A FLECHA DE CABLES DE GUARDA DE 38MM2 m 0.00% 0.12 30.00 30.00 0.00 0.00
###
AEL23KV SUMINISTRO E INSTALACION DE RETENIDAS EN MT
AEL23KV C5340 SUMINISTRO Y MONTAJE DE RETENIDO INCLINADA TRIPLE und 0.00% 15.20 46.00 46.00 0.00 0.00
###
AEL23KV SUMINISTRO E INSTALACION DE REDES SUBTERRANEAS EN 23KV
AEL23KV C5340 SUMINISTRO E INSTALACION DE CABLE TIPO 3-1/c #250mcm + SHD m 0.00% 1.62 252.00 252.00 0.00 0.00
###
AEL23KV C5340 INSTALACION DE TERMINALES TERMOCONTRAIBLES PARA CABLE 3-1/c #250 mcm + SHD kit 0.00% 5.00 5.00 5.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
AEL23KV PRUEBAS Y PUESTA EN SERVICIO
AEL23KV C5340 PRUEBA Y PUESTA EN SERVICIO DE LA ACOMETIDA EN 23KV GLB 0.00% 2.00 2.00 2.00 0.00 0.00
###
AEL23KV DISCIPLINA: INSTRUMENTACIÓN Y CONTROL ###
AEL23KV SUMINISTRO E INSTALACIÓN DE POSTES DE MADERA
AEL23KV C5360 SUMINISTRO Y DESCARGO DE POTES DE MADERA DE 90PIES und 100.00% 2.80 6.00 6.00 6.00 6.00
###
AEL23KV C5360 TRASLADO DE POSTE DE MADERA DE 90PIES DE ALMACEN A PUNTO DE IZAJE und 100.00% 25.92 52.00 52.00 52.00 52.00
###
AEL23KV C5360 IZAJE DE POSTE DE MADERA DE 90 PIES und 100.00% 10.40 21.00 21.00 21.00 21.00
###
AEL23KV C5360 ROTULADO Y CODIFICADO DE POSTES MADERA MEDIA TENSION (Inc. Torulado, Sela. Pat. y Pe und 100.00% 3.68 7.00 7.00 7.00 7.00
###
AEL23KV SUMINISTRO Y MONTAJE DE ARMADOS
AEL23KV C5380 SUMINISTRO Y MONTAJE DE ARMADO DE FIBRA OPTICA EN POSTE EXISTENTE- P10 und 0.00% 3.20 3.00 3.00 0.00 0.00
###
AEL23KV C5380 SUMINISTRO Y MONTAJE DE ARMADO EN FIBRA OPTICA EN POSTE EXISTENTE- P11 und 0.00% 2.40 2.00 2.00 0.00 0.00
###
AEL23KV C5380 SUMINISTRO Y MONTAJE DE ARMADO DE FIBRA OPTICA EN POSTE PASANTE PROYECTADO und 0.00% 1.92 2.00 2.00 0.00 0.00
###
AEL23KV C5380 SUMINISTRO Y MONTAJE DE ARMADO DE FIBRA OPTICA EN POSTE TERMINAL PROYECTADO und 0.00% 2.00 2.00 2.00 0.00 0.00
###
AEL23KV C5380 SUMINISTRO Y MONTAJE DE ARMADO DE FIBRA OPTICA EN POSTE PASANTE- P12.02 und 0.00% 1.85 2.00 2.00 0.00 0.00
###
AEL23KV C5380 MONTAJE DE ARMADO DE FIBRA OPTICA EN POSTE PASANTE- P12.03 und 0.00% 1.60 2.00 2.00 0.00 0.00
###
AEL23KV SUMINISTRO Y MONTAJE DE CONDUCTORES DE FIBRA OPTICA
AEL23KV C5390 SUMINISTRO, TENDIDO Y PUESTA A FLECHA DE CABLES FIBRA OPTICA ADSS SM 24H m 0.00% 0.15 62.00 62.00 0.00 0.00
###
AEL23KV SUMINISTRO E INSTALACION DE REDES SUBTERRANEAS EN TRAMO 01
AEL23KV C5390 SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.80 55.00 55.00 0.00 0.00
###
AEL23KV PRUEBAS Y PUESTA EN SERVICIO
AEL23KV C5390 PRUEBA Y PUESTA EN SERVICIO DE LA ACOMETIDA FIBRA OPTICA 24H ADSS SM GLB 0.00% 104.00 104.00 104.00 0.00 0.00
###
T SUB ESTACIÓN DE 600KVA, 23/0.48/0.40-0.23KV, 4300msnm (INCLUYE MONTAJE Y SUMINISTRO) ###
T - DISCIPLINA: CIVIL ###
T MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS ###
T C2000 EXCAVACION P/ZAPATAS m3 100.00% 1.53 17.00 28.00 17.00 28.00
###
T C2000 EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 6.20 93.00 93.00 93.00 93.00
###
T C5220 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.13 12.00 2.00 12.00 2.00
###
T C5220 RELLENO MATERIAL PROPIO SELECCIONADO m3 100.00% 3.05 18.00 9.00 18.00 9.00
###
T C5220 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.11 3.00 3.00 3.00 3.00
###
T C5220 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.05 2.00 1.00 2.00 1.00
###
T C5220 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.23 6.00 6.00 6.00 6.00
###
T CONCRETO SIMPLE ###
T C5200 CONCRETO SIMPLE PARA ZAPATAS
T C5200 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 6.18 6.00 12.00 6.00 12.00
###
T C5200 CONCRETO SIMPLE PARA LOSAS DE EQUIPOS
T C5200 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 6.18 12.00 12.00 12.00 12.00
###
T C5200 CONCRETO SIMPLE PARA DADOS DE CONCRETO
T C5200 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 6.00 6.00 0.00 0.00
###
T CONCRETO SIMPLE
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
T C5200 ZAPATAS
T C5200 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 17.00 17.00 17.00 17.00
###
T C5200 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 18.00 9.00 18.00 9.00
###
T C5200 PEDESTAL
T C5200 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 5.83 6.00 4.00 6.00 4.00
###
T C5200 ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 100.00% 2.63 21.00 19.00 21.00 19.00
###
T C5200 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 100.00% 0.12 19.00 20.00 19.00 20.00
###
T C5230 LOSA
T C5230 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 117.00 117.00 0.00 0.00
###
T C5230 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 0.00% 2.47 17.00 17.00 0.00 0.00
###
T C5230 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 110.00 110.00 0.00 0.00
###
T C5230 MUROS
T C5230 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.83 23.00 23.00 0.00 0.00
###
T C5230 ENCOFRADO CARAVISTA Y DESENCOFRADO DE MURO m2 0.00% 3.50 67.00 67.00 0.00 0.00
###
T C5230 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 73.00 73.00 0.00 0.00
###
T C5230 CURADO DE CONCRETO CON ADITIVO
T C5230 CURADO DE CONCRETO CON ANTISOL m2 50.00% 0.14 15.00 15.00 7.00 7.00
###
T APLICACIÓN DE GROUT E IMPERMEABILIZANTE
T C5250 GROUT PARA PEDESTAL E=2.5CM m2 0.00% 10.94 11.00 11.00 0.00 0.00
###
T ESTRUCTURAS METÁLICAS ###
T C5250 MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS ###
T C5250 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS
T C5250 ACERO ESTRUCTURAL TUBO 6"x6"x316" kg 60.00% 0.06 24.00 24.00 14.00 14.00
###
T C5250 ACERO ESTRUCTURAL PLANCHA 1/2" kg 60.00% 0.06 7.00 7.00 4.00 4.00
###
T C5250 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES
T C5250 ACERO ESTRUCTURAL TUBO 6"x6"x316" kg 30.80% 0.06 37.00 37.00 11.00 11.00
###
T C5250 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS
T C5250 ACERO ESTRUCTURAL PERFIL U 6"x2"x4.5mm kg 28.73% 0.09 36.00 36.00 10.00 10.00
###
T C5250 ACERO ESTRUCTURAL ANGULO 4"x4"x1/4" kg 0.00% 0.09 3.00 3.00 0.00 0.00
###
T C5250 SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES
T C5250 ACERO ESTRUCTURAL FIERRO LISO Ø5/8" kg 3.24% 0.11 3.00 3.00 0.00 0.00
###
T C5250 SUMINISTRO, INSTALACIÓN DE COBERTURA
T C5250 SUMINISTRO, INSTALACIÓN COBERTURA TR-4 m2 59.66% 0.43 40.00 40.00 24.00 24.00
###
T C5250 SUMINISTRO, INSTALACIÓN DE CUMBRERA
T C5250 SUMINISTRO, INSTALACIÓN DE CUMBRERA TR-4 m 60.00% 0.17 1.00 1.00 1.00 1.00
###
T C5250 INSTALACIÓN E IZAJE ACERO ESTRUCTURAL CERCO
T C5250 ACERO ESTRUCTURAL TUBO DE F°G° Ø3" SCH40 kg 0.00% 0.10 15.00 15.00 0.00 0.00
###
T C5250 ACERO ESTRUCTURAL TUBO DE F°G° Ø2" SCH40 kg 0.00% 0.10 19.00 19.00 0.00 0.00
###
T C5250 ACERO ESTRUCTURAL TUBO DE F°G° Ø1 1/2" SCH40 kg 0.00% 0.12 3.00 3.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
T C5250 TEMPLADOR DE FIERRO LISO F°G° Ø3/8" SCH40 kg 0.00% 0.11 1.00 1.00 0.00 0.00
###
T C5250 TEMPLADOR ALAMBRE F°G° N°8 kg 0.00% 0.18 0.00 0.00 0.00 0.00
###
T C5250 ACCESORIOS PARA POSTE DE CERCO GLB 0.00% 4.40 4.00 4.00 0.00 0.00
###
T C5250 ACCESORIOS PARA PUERTA GLB 0.00% 4.40 4.00 4.00 0.00 0.00
###
T C5250 MALLA GALVANIZADA #8 - 2"x2" kg 0.00% 0.23 110.00 110.00 0.00 0.00
###
T C5250 SUMINISTRO, INSTALACION DE ALAMBRE DE PUAS N° 14 m 0.00% 0.08 3.00 3.00 0.00 0.00
###
T C5250 INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE
T C5250 ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=5/8" kg 0.00% 0.18 3.00 3.00 0.00 0.00
###
T C5250 INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
T C5250 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 0.00% 0.09 11.00 11.00 0.00 0.00
###
T C5250 PINTURA ###
T C5250 PINTURA DE ELEMENTOS METALICOS m2 60.00% 0.44 41.00 41.00 25.00 25.00
###
T DISCIPLINA: INSTALACIONES SANITARIAS ###
T TUBERIAS ###
T C5260 MONTANTE DE AGUAS DE LLUVIA
T C5260 975-SD-4"-P0E03U-100036
T C5260 Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 1.52 9.00 9.00 0.00 0.00
###
T C5260 El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 0.00 0.00 0.00 0.00 0.00
###
T MECÁNICA
T C5260 CANALETAS DE AGUAS DE LLUVIA
T C5260 ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 0.00% 0.13 3.00 3.00 0.00 0.00
###
T C5260 ACERO ESTRUCTURAL PLANCHA FIERRO GALVANIZADO E=0.8 MM kg 0.00% 0.09 14.00 14.00 0.00 0.00
###
T C5260 SOPORTERIA
T C5260 GS1-4", Tubería 975-SD-4"-P0E03U-100036 pza 0.00% 3.00 6.00 6.00 0.00 0.00
###
T DISCIPLINA: INSTALACIONES ELÉCTRICAS ###
T SALIDAS PARA ALUMBRADO Y TOMACORRIENTES
T C5270 ARTEFACTO DE ALUMBRADO LITHONIA LIGHTING FEM L48 8000LM LPPFL WD 90CRI 50K pto 0.00% 7.28 29.00 29.00 0.00 0.00
###
T C5270 SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON 1286W pto 0.00% 1.76 2.00 2.00 0.00 0.00
###
T C5270 SUMINISTRO E INSTALACIÓN DE RECEPTÁCULO 975-WRL-740 TIPO PIN AND SLEEVE; 3 pto 0.00% 3.67 4.00 4.00 0.00 0.00
###
T TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN
T C5270 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO AUTOSOPORTADO 975-DPA-1154 und 0.00% 55.00 55.00 55.00 0.00 0.00
###
T C5270 SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-LPA-1243 UND 0.00% 73.60 74.00 74.00 0.00 0.00
###
T CANALIZACIONES, CONDUCTOS Y TUBERÍAS
T C5270 SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.57 3.00 3.00 0.00 0.00
###
T C5270 SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 0.96 48.00 48.00 0.00 0.00
###
T C5270 SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 0.66 11.00 11.00 0.00 0.00
###
T C5270 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 1.22 4.00 4.00 0.00 0.00
###
T C5270 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 3"Ø m 0.00% 1.52 26.00 26.00 0.00 0.00
###
T CONDUCTORES Y CABLES DE ENERGIA
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
T C5270 SUMINISTRO E INSTALACIÓN DE CABLE 2-1/c #12 AWG + GRD; XHHW-2, 0.6 Kv M 0.00% 0.29 6.00 6.00 0.00 0.00
###
T C5270 SUMINISTRO E INSTALACIÓN DE CABLE 3-1/c #250 Kcmil + GRD; XHHW-2, 0.6 Kv m 0.00% 0.34 17.00 17.00 0.00 0.00
###
T C5270 SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #4 AWG, XHHW-2, 0.6Kv m 0.00% 0.24 3.00 3.00 0.00 0.00
###
T C5270 SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #10 AWG + GRD; XHHW-2, 0.6 Kv m 0.00% 0.24 18.00 18.00 0.00 0.00
###
T EQUIPOS ELÉCTRICOS
T C5240 SUMINISTRO E INSTALACIÓN PARARRAYOS IONIZANTE NO RADIACTIVO CON DISPOSITIVO und 0.00% 7.84 16.00 16.00 0.00 0.00
###
T C5240 SUMINISTRO E INSTALACIÓN DE TRANSFORMADOR DE 200KVA 975-XFZ-1072 und 0.00% 52.00 52.00 52.00 0.00 0.00
###
T C5240 SUMINISTRO Y MONTAJE DE SUBESTACIÓN TIPO SKID 600KVA,23/0.48/0.4-23KV, 975-USS-1 und 0.00% 330.00 330.00 330.00 0.00 0.00
###
T ESTUDIO DE CORDINACIÓN PARA PROTECCIÓN
T C5240 ESTUDIO DE CORDINACIÓN DE PROTECCIONES PARA INSTALACIÓN DE SUB ESTACIÓN 975 und 0.00% 0.00 0.00 0.00 0.00 0.00
###
RDBT RED DE DISTRIBUCIÓN DE BAJA TENSIÓN ###
RDBT - DISCIPLINA: CIVIL ###
RDBT MOVIMIENTO DE TIERRAS EN ACOMETIDA ELÉCTRICA Y EN REDES DE DISTRIBUCIÓN EN BAJA TENSIÓN ###
RDBT C5400 EXCAVACION MASIVA CON EQUIPO m3 83.78% 1.45 664.00 992.00 556.00 831.00
###
RDBT C5400 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 81.42% 0.13 43.00 721.00 35.00 587.00
###
RDBT C5430 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 86.70% 0.16 35.00 81.00 30.00 71.00
###
RDBT C5430 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 86.70% 0.04 48.00 112.00 41.00 97.00
###
RDBT C5430 RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 81.54% 1.78 307.00 933.00 250.00 760.00
###
RDBT C5430 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 77.75% 2.03 573.00 573.00 446.00 446.00
###
RDBT C5430 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 83.42% 0.11 25.00 78.00 21.00 65.00
###
RDBT C5430 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 83.42% 0.05 20.00 96.00 17.00 80.00
###
RDBT C5430 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 83.42% 0.23 51.00 160.00 43.00 134.00
###
RDBT CONCRETO SIMPLE ###
RDBT C5420 CONCRETO ARMADO EN BANCO DE DUCTOS
RDBT C5420 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 43.12% 0.12 16.00 16.00 7.00 7.00
###
RDBT C5420 ENCOFRADO CARAVISTA Y DESENCOFRADO m2 38.15% 2.47 368.00 368.00 140.00 140.00
###
RDBT C5420 COLOCACIÓN DE CONCRETO F'c=20 MPa CON OCRE m3 32.51% 8.53 512.00 512.00 166.00 166.00
###
RDBT C5420 CURADO DE CONCRETO CON ADITIVO
RDBT C5420 CURADO DE CONCRETO CON ANTISOL m2 16.55% 0.14 36.00 36.00 6.00 6.00
###
RDBT DISCIPLINA: INSTALACIONES ELÉCTRICAS ###
RDBT CANALIZACIONES, CONDUCTOS Y TUBERÍAS
RDBT C5410 SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 65.85% 0.57 26.00 26.00 17.00 17.00
###
RDBT C5410 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC SCH40 Ø3" m 65.89% 0.93 12.00 12.00 8.00 8.00
###
RDBT C5410 SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø4" m 65.92% 1.24 43.00 43.00 29.00 29.00
###
RDBT C5410 SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø4" m 73.03% 1.47 291.00 291.00 213.00 213.00
###
RDBT C5410 SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø6" m 83.28% 1.96 161.00 161.00 134.00 134.00
###
RDBT C5410 SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 65.76% 0.96 744.00 744.00 489.00 489.00
###
RDBT C5410 SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 65.74% 0.80 438.00 438.00 288.00 288.00
###
RDBT C5410 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 3"Ø m 66.00% 1.52 21.00 21.00 14.00 14.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
RDBT C5410 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 1"Ø m 66.73% 0.82 7.00 7.00 5.00 5.00
###
RDBT C5410 SUMINISTRO E INSTALACIÓN DE TUBERIA RGS 4"Ø m 66.01% 1.52 9.00 9.00 6.00 6.00
###
RDBT C5410 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 64.85% 1.22 9.00 9.00 6.00 6.00
###
RDBT CONDUCTORES Y CABLES DE ENERGIA
RDBT C5410 SUMINISTRO E INSTALACIÓN DE CABLE 4-1/c #350 Kcmil + GRD; XHHW-2, 0.6 Kv m 4.35% 0.32 64.00 64.00 3.00 3.00
###
RDBT C5410 SUMINISTRO E INSTALACIÓN DE CABLE 4-1/c #2 AWG + GRD; XHHW-2, 0.6 Kv m 4.35% 0.32 60.00 60.00 3.00 3.00
###
RDBT C5410 SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #4 AWG + GRD; XHHW-2, 0.6 Kv m 4.35% 0.24 136.00 136.00 6.00 6.00
###
RDBT C5410 SUMINISTRO E INSTALACIÓN DE CABLE 4-1/c #250 Kcmil + GRD; XHHW-2, 0.6 Kv m 4.35% 0.32 147.00 147.00 6.00 6.00
###
RDBT C5410 SUMINISTRO E INSTALACIÓN DE CABLE 4-1/c #350 Kcmil + GRD; XHHW-2, 0.6 Kv m 4.35% 0.32 202.00 202.00 9.00 9.00
###
RDBT C5410 SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #6 AWG + GRD; XHHW-2, 0.6 Kv m 4.35% 0.29 20.00 20.00 1.00 1.00
###
RDBT C5410 SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #12 AWG + GRD; XHHW-2, 0.6 Kv M 4.35% 0.29 9.00 9.00 0.00 0.00
###
RDBT C5410 SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #6 AWG + GRD; XHHW-2, 0.6 Kv m 4.35% 0.24 18.00 18.00 1.00 1.00
###
RDBT C5410 PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 4.35% 204.00 204.00 204.00 9.00 9.00
###
BBEE BUZONES ELECTRICOS ###
BBEE - DISCIPLINA: CIVIL ###
BBEE MOVIMIENTO DE TIERRAS EN BUZONES ELÉCTRICOS ###
BBEE C5000 EXCAVACIÓN PARA BUZONES ELÉCTRICOS m3 95.90% 1.53 92.00 92.00 88.00 88.00
###
BBEE C5000 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 95.94% 0.13 22.00 22.00 21.00 21.00
###
BBEE C5020 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 94.13% 0.16 1.00 1.00 1.00 1.00
###
BBEE C5020 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 95.22% 0.04 1.00 1.00 1.00 1.00
###
BBEE C5020 FILTRO DE GRAVA 1/2" m3 95.20% 2.73 14.00 14.00 13.00 13.00
###
BBEE C5020 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 96.18% 0.11 8.00 8.00 8.00 8.00
###
BBEE C5020 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 95.87% 0.05 7.00 7.00 7.00 7.00
###
BBEE C5020 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 96.01% 0.23 17.00 17.00 17.00 17.00
###
BBEE CONCRETO SIMPLE ###
BBEE C5520 CONCRETO ARMADO EN BUZONES ELÉCTRICOS
BBEE C5520 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 89.54% 0.12 607.00 607.00 543.00 543.00
###
BBEE C5520 ENCOFRADO CARAVISTA Y DESENCOFRADO m2 65.67% 2.47 657.00 657.00 432.00 432.00
###
BBEE C5520 COLOCACIÓN DE CONCRETO F'c=20 MPa m3 64.63% 6.18 222.00 222.00 144.00 144.00
###
BBEE C5520 CURADO DE CONCRETO CON ADITIVO
BBEE C5520 CURADO DE CONCRETO CON ANTISOL m2 40.77% 0.14 40.00 40.00 16.00 16.00
###
BBEE CARPINTERIA METALICA
BBEE C5520 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA F°G° CON PLANCHA ESTRIADA DE 730x730 und 10.00% 1.50 15.00 15.00 2.00 2.00
###
IE ILUMINACION EXTERIOR ###
IE - DISCIPLINA: CIVIL ###
IE MOVIMIENTO DE TIERRAS EN ACOMETIDA ELÉCTRICA Y EN REDES DE DISTRIBUCIÓN EN BAJA TENSIÓN ###
IE C5600 EXCAVACION MASIVA CON EQUIPO m3 57.62% 1.45 78.00 78.00 45.00 45.00
###
IE C5600 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 57.59% 0.13 8.00 8.00 5.00 5.00
###
IE C5600 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 50.58% 0.16 5.00 5.00 3.00 3.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
IE C5600 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 49.75% 0.04 7.00 7.00 3.00 3.00
###
IE C5600 RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 50.08% 1.78 46.00 46.00 23.00 23.00
###
IE C5600 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 49.88% 2.03 59.00 59.00 29.00 29.00
###
IE C5600 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 55.77% 0.11 4.00 4.00 2.00 2.00
###
IE C5600 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 57.09% 0.05 3.00 3.00 2.00 2.00
###
IE C5600 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 56.21% 0.23 8.00 8.00 4.00 4.00
###
IE CONCRETO SIMPLE ###
IE C5610 CONCRETO PARA POSTES DE ILUMINACION EXTERIOR
IE C5610 COLOCACIÓN DE CONCRETO F'c=20 MPa m3 62.22% 6.18 56.00 56.00 35.00 35.00
###
IE C5610 ENCOFRADO CARAVISTA Y DESENCOFRADO m2 68.84% 2.47 143.00 143.00 99.00 99.00
###
IE C5610 CURADO DE CONCRETO CON ADITIVO
IE C5610 CURADO DE CONCRETO CON ANTISOL m2 24.06% 0.14 9.00 9.00 2.00 2.00
###
IE DISCIPLINA: INSTALACIONES ELÉCTRICAS ###
IE SALIDAS PARA ALUMBRADO Y TOMACORRIENTES
IE C5620 SUMINISTRO Y MONTAJE DE EQUIPO FLUORESCENTE HOLOPHANE PMLED P5 50K pto 0.00% 8.00 216.00 216.00 0.00 0.00
###
IE TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN
IE C5620 SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE 230x330x183mm; A°F°UND 0.00% 1.38 19.00 19.00 0.00 0.00
###
IE CANALIZACIONES, CONDUCTOS Y TUBERÍAS
IE C5630 SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.57 112.00 112.00 0.00 0.00
###
IE C5630 SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.80 104.00 104.00 0.00 0.00
###
IE C5630 SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 0.96 145.00 145.00 0.00 0.00
###
IE C5630 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 1.22 72.00 72.00 0.00 0.00
###
IE C5630 SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.90 190.00 190.00 0.00 0.00
###
IE CONDUCTORES Y CABLES DE ENERGIA
IE C5630 SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #8 AWG + GRD; XHHW-2, 0.6 Kv m 0.00% 0.24 157.00 157.00 0.00 0.00
###
IE C5630 SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #8 AWG + GRD, XHHW-2, 0.6 Kv m 0.00% 0.29 61.00 61.00 0.00 0.00
###
IE ILUMINACION EXTERIOR
IE C5620 SUMINISTRO Y MONTAJE DE POSTE METÁLICO DE 12m DE ALTURA UND 0.00% 61.44 860.00 860.00 0.00 0.00
###
IE C5620 PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 0.00% 204.00 204.00 204.00 0.00 0.00
###
SPT SISTEMA DE PUESTA A TIERRA ###
SPT - DISCIPLINA: CIVIL ###
SPT MOVIMIENTO DE TIERRAS PARA SISTEMA DE PUESTA A TIERRA Y PROTECCION ATMOSFERICA ###
SPT EXCAVACIÓN PARA MALLAS Y POZOS DE PUESTA A TIERRA m3 84.74% 6.20 4,743.00 4,743.00 4,019.00 4,019.00
###
SPT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 84.74% 2.03 782.00 782.00 662.00 662.00
###
SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 84.74% 0.16 54.00 54.00 45.00 45.00
###
SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 84.74% 0.04 73.00 73.00 62.00 62.00
###
SPT RELLENO PARA MALLAS Y POZOS DE PUESTA A TIERRA CON TOP SOIL CERNIDA Y COMPAC m3 84.59% 2.70 718.00 718.00 608.00 608.00
###
SPT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 84.73% 0.11 54.00 54.00 46.00 46.00
###
SPT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 84.74% 0.05 44.00 44.00 37.00 37.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
SPT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 84.73% 0.23 111.00 111.00 94.00 94.00
###
SPT CONCRETO SIMPLE ###
SPT OBRAS DE CONCRETO ARMADO EN PEDESTAL DE PARARRAYO
SPT COLOCACIÓN DE CONCRETO EN PEDESTAL DE PARARRAYO f'c=20 MPa m3 0.00% 6.18 6.00 6.00 0.00 0.00
###
SPT ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 2.47 10.00 10.00 0.00 0.00
###
SPT SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 14.00 14.00 0.00 0.00
###
SPT CURADO DE CONCRETO CON ADITIVO
SPT CURADO DE CONCRETO CON ANTISOL m2 0.00% 0.14 1.00 1.00 0.00 0.00
###
SPT APLICACIÓN DE GROUT E IMPERMEABILIZANTE
SPT GROUT PARA PEDESTAL E=2.5CM m2 0.00% 10.94 11.00 11.00 0.00 0.00
###
SPT ESTRUCTURAS METÁLICAS ###
SPT MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS ###
SPT MONTAJE, INSTALACIÓN E IZAJE DE MÁSTIL DE PROTECCIÓN ATMOSFÉRICA
SPT ACERO ESTRUCTURAL PLANCHAS BASE Y CARTELAS 1/2" kg 0.00% 0.06 8.00 8.00 0.00 0.00
###
SPT INSTALACION E IZAJE ACERO ESTRUCTURAL DE MÁSTIL DE TUBERÍA ZINCADA SCH40 kg 0.00% 0.09 49.00 49.00 0.00 0.00
###
SPT INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE
SPT ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=3/4" kg 0.00% 0.06 1.00 1.00 0.00 0.00
###
SPT INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
SPT INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 0.00% 0.09 3.00 3.00 0.00 0.00
###
SPT PINTURA ###
SPT PINTURA DE ELEMENTOS METALICOS m2 0.00% 0.44 6.00 6.00 0.00 0.00
###
SPT DISCIPLINA: INSTALACIONES ELÉCTRICAS ###
SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 120 MM2 (#4/0 AWG) PARA m 67.04% 0.81 2,526.00 2,526.00 1,693.00 1,693.00
###
SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE THHN/THWN COLOR VERDE 70 MM2 ( m 66.39% 0.65 229.00 229.00 152.00 152.00
###
SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 16 MM2 (#6 AWG) PARA m 65.99% 0.52 15.00 15.00 10.00 10.00
###
SPT SUMINISTRO E INSTALACIÓN DE CINTA SEÑALIZADORA PARA CONDUCTOR DE MALLA PRINCIP m 4.02% 0.09 281.00 281.00 11.00 11.00
###
SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA A TIERRA EN COLU und 0.00% 0.43 49.00 49.00 0.00 0.00
###
SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA A TIERRA DE POZO und 0.00% 92.00 276.00 276.00 0.00 0.00
###
SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA A TIERRA DE POZO A und 0.00% 73.60 1,619.00 1,619.00 0.00 0.00
###
SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA A TIERRA PARA MO und 0.00% 1.44 14.00 14.00 0.00 0.00
###
SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA A TIERRA DE BARAN und 0.00% 1.02 6.00 6.00 0.00 0.00
###
SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA A TIERRA DEL POR und 0.00% 6.40 13.00 13.00 0.00 0.00
###
SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA A TIERRA PARA TA und 0.00% 1.48 46.00 46.00 0.00 0.00
###
SPT SUMINISTRO E INSTALACIÓN DE CONEXIÓN CON SOLDADURA EXOTÉRMICA GLB 0.00% 1.28 1.00 1.00 0.00 0.00
###
SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA A TIERRA PARA CON und 0.00% 1.97 12.00 12.00 0.00 0.00
###
SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA A TIERRA A POSTES und 0.00% 2.47 35.00 35.00 0.00 0.00
###
SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA A TIERRA DE POSTE und 0.00% 1.85 176.00 176.00 0.00 0.00
###
SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA A TIERRA DEL PO und 0.00% 1.64 7.00 7.00 0.00 0.00
###
SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA A TIERRA DE BUZO und 0.00% 1.48 15.00 15.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
IC INSTRUMENTACIÓN Y CONTROL ###
IC - DISCIPLINA: CIVIL ###
IC MOVIMIENTO DE TIERRAS PARA DUCTOS DE INSTRUMENTACIÓN Y CONTROL ###
IC C5900 EXCAVACIÓN CON MAQUINARIA DE ZANJAS PARA TENDIDO DE CABLE m3 83.78% 1.45 71.00 71.00 60.00 60.00
###
IC C5900 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 81.42% 0.13 5.00 5.00 4.00 4.00
###
IC C5930 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 86.70% 0.16 2.00 2.00 2.00 2.00
###
IC C5930 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 86.70% 0.04 3.00 3.00 2.00 2.00
###
IC C5930 RELLENO Y COMPACTACIÓN CON TIERRA CERNIDA m3 81.54% 3.55 36.00 36.00 29.00 29.00
###
IC C5930 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 77.75% 2.03 30.00 30.00 24.00 24.00
###
IC C5930 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 83.42% 0.11 5.00 5.00 4.00 4.00
###
IC C5930 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 83.42% 0.05 4.00 4.00 3.00 3.00
###
IC C5930 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 83.42% 0.23 10.00 10.00 9.00 9.00
###
IC CONCRETO SIMPLE ###
IC CONCRETO ARMADO EN BUZONES DE INSTRUMENTACION (430-MH)
IC C5920 COLOCACIÓN DE CONCRETO F'c=20 MPa EN BUZONES ELÉCTRICOS m3 48.16% 6.18 74.00 74.00 36.00 36.00
###
IC C5920 ENCOFRADO CARAVISTA Y DESENCOFRADO m2 48.16% 2.47 183.00 183.00 88.00 88.00
###
IC C5920 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO LISO ASTM A36 PARA ESCALERA kg 48.16% 0.12 8.00 8.00 4.00 4.00
###
IC C5920 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 48.16% 0.12 169.00 169.00 81.00 81.00
###
IC C5920 PINTADO EXTERIOR DE BUZONES ELECTRICOS CON IGOL PRIMER E IGOL DENSO DE SIKA m2 48.16% 0.84 51.00 51.00 25.00 25.00
###
IC CARPINTERIA METALICA ###
IC C5950 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA F°G° CON PLANCHA ESTRIADA DE 730x730X1 und 84.40% 1.50 5.00 5.00 4.00 4.00
###
IC C5950 INSTALACIÓN DE SOPORTE DE TABLERO PARA CONTROLADOR DE SENSORES DE TRAMPA und 28.00% 8.00 16.00 16.00 4.00 4.00
###
IC ESTRUCTURAS METÁLICAS ###
IC MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS ###
IC C5940 INSTALACIÓN E IZAJE DE POSTES METÁLICOS PARA CÁMARAS DE VIDEOVIGILANCIA
IC C5940 ACERO ESTRUCTURAL PLANCHAS BASE Y CARTELAS 1/2" kg 70.00% 0.06 9.00 9.00 6.00 6.00
###
IC C5940 INSTALACION E IZAJE ACERO ESTRUCTURAL DE MÁSTIL DE TUBERÍA ZINCADA SCH40 kg 70.00% 0.09 34.00 34.00 24.00 24.00
###
IC C5940 INSTALACION DE BRIDAS DE 3/8" kg 89.50% 0.13 1.00 1.00 1.00 1.00
###
IC C5940 INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE
IC C5940 ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=5/8" kg 89.50% 0.18 1.00 1.00 1.00 1.00
###
IC INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
IC C5940 INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 70.00% 0.09 5.00 5.00 3.00 3.00
###
IC PINTURA ###
IC C5940 PINTURA DE ELEMENTOS METALICOS m2 0.00% 0.44 6.00 6.00 0.00 0.00
###
IC DISCIPLINA: INSTRUMENTACIÓN ###
IC CABLES, CONDUCTORES Y ACCESORIOS
IC C5960 SUMINISTRO E INSTALACIÓN DE CABLE PATCH CORD 2LC-2LC m 0.00% 0.14 3.00 3.00 0.00 0.00
###
IC C5960 SUMINISTRO E INSTALACIÓN DE FIBRA ÓPTICA ADSS SM 24 HILOS m 0.00% 0.20 38.00 38.00 0.00 0.00
###
IC C5960 SUMINISTRO E INSTALACIÓN DE FIBRA ÓPTICA ADSS SM 06 HILOS m 0.00% 0.15 34.00 34.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
IC C5960 SUMINISTRO E INSTALACIÓN DE CABLE UTP CAT6A m 0.00% 0.08 7.00 7.00 0.00 0.00
###
IC BANDEJAS, CONDUITS Y ACCESORIOS
IC C5910 SUMINISTRO E INSTALACIÓN DE ACCESORIOS PARA LA INSTALACIÓN DE TUB. PVC SCH 2"Ø m 0.00% 56.29 3,040.00 3,040.00 0.00 0.00
###
IC C5910 SUMINISTRO E INSTALACIÓN DE ACCESORIOS PARA LA INSTALACIÓN DE TUB. HDPE SDR11 m 0.00% 0.80 106.00 106.00 0.00 0.00
###
IC C5910 SUMINISTRO E INSTALACIÓN DE ACCESORIOS PARA LA INSTALACIÓN DE TUB. HDPE SDR11 m 0.00% 0.80 94.00 94.00 0.00 0.00
###
IC C5910 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 1"Ø m 0.00% 0.82 20.00 20.00 0.00 0.00
###
IC C5910 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 1.22 39.00 39.00 0.00 0.00
###
IC C5910 SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 3"Ø m 0.00% 1.52 15.00 15.00 0.00 0.00
###
IC C5910 SUMINISTRO E INSTALACIÓN DE TUBERIA FLEXIBLE Y ACCESORIOS RGS 2"ø m 0.00% 1.26 30.00 30.00 0.00 0.00
###
IC C5910 SUMINISTRO E INSTALACIÓN DE TUBERIA FLEXIBLE Y ACCESORIOS RGS 1"ø m 0.00% 1.05 8.00 8.00 0.00 0.00
###
IC C5910 SUMINISTRO E INSTALACIÓN DE TUBERIA FLEXIBLE Y ACCESORIOS RGS 3"ø m 0.00% 1.66 3.00 3.00 0.00 0.00
###
IC C5910 SUMINISTRO E INSTALACIÓN DE CAJAS CONDULET TIPO RECTANGULAR PESADA 8"x8"x4" und 0.00% 5.60 11.00 11.00 0.00 0.00
###
IC EQUIPOS Y DISPOSITIVOS
IC C5950 SUMINISTRO E INSTALACION DE EQUIPOS DE VOZ Y DATA. INCLUYE ACCESORIOS und 0.00% 2.27 2.00 2.00 0.00 0.00
###
IC C5950 SUMINISTRO E INSTALACIÓN DE GABINETE PARA TABLEROS DE COMUNICACIONES und 0.00% 43.31 43.00 43.00 0.00 0.00
###
IC C5950 SUMINISTRO E INSTALACIÓN DE EQUIPOS DE SISTEMA CAMARA 975-CCTV-1001 und 0.00% 8.50 9.00 9.00 0.00 0.00
###
IC C5950 SUMINISTRO E INSTALACIÓN DE EQUIPOS DE SISTEMA CAMARA 975-CCTV-1002 und 0.00% 8.50 9.00 9.00 0.00 0.00
###
IC C5950 SUMINISTRO E INSTALACIÓN DE SENSORES DE TRAMPAS DE GRASA und 0.00% 45.60 91.00 91.00 0.00 0.00
###
CER CERCO PERIMÉTRICO ###
CER - DISCIPLINA: CIVIL ###
CER MOVIMIENTO DE TIERRAS ###
CER EXCAVACION PARA DADOS DE ANCLAJE m3 66.65% 6.20 87.00 87.00 58.00 58.00
###
CER REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 59.18% 0.13 23.00 23.00 14.00 14.00
###
CER ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 66.67% 0.11 2.00 2.00 1.00 1.00
###
CER ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 66.66% 0.05 2.00 2.00 1.00 1.00
###
CER APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 66.67% 0.23 4.00 4.00 3.00 3.00
###
CER SUMINISTRO DE COMBUSTIBLE
CER SUMINISTRO DE COMBUSTIBLE GLB 100.00% 16.00 16.00 16.00 16.00 16.00
###
CER SUMINISTRO DE CONCRETO
CER SUMINISTRO DE CONCRETO F'c=20 MPa m3 28.57% 6.18 93.00 93.00 26.00 26.00
###
CER CONCRETO SIMPLE ###
CER CONCRETO SIMPLE PARA DADOS DE CONCRETO
CER COLOCACIÓN DE CONCRETO F'c=20 MPa m3 19.05% 6.18 93.00 93.00 18.00 18.00
###
CER CURADO DE CONCRETO CON ADITIVO
CER CURADO DE CONCRETO CON ANTISOL m2 4.76% 0.14 2.00 2.00 0.00 0.00
###
CER ESTRUCTURAS METÁLICAS ###
CER MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS ###
CER INSTALACIÓN E IZAJE ACERO ESTRUCTURAL CERCO
CER ACERO ESTRUCTURAL TUBO DE F°G° Ø3" SCH40 kg 27.29% 0.10 150.00 150.00 41.00 41.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
CER ACERO ESTRUCTURAL TUBO DE F°G° Ø2" SCH40 kg 27.29% 0.10 553.00 553.00 151.00 151.00
###
CER ACERO ESTRUCTURAL TUBO DE F°G° Ø1 1/2" SCH40 kg 27.10% 0.12 15.00 15.00 4.00 4.00
###
CER ACERO ESTRUCTURAL TUBO DE F°G° Ø1 1/4" SCH40 kg 27.10% 0.12 199.00 199.00 54.00 54.00
###
CER ACERO ESTRUCTURAL TUBO DE F°G° Ø1" SCH40 kg 27.05% 0.12 0.00 0.00 0.00 0.00
###
CER TEMPLADOR DE FIERRO LISO F°G° Ø3/8" SCH40 kg 52.75% 0.11 31.00 31.00 16.00 16.00
###
CER TEMPLADOR ALAMBRE F°G° N°8 kg 1.61% 0.18 23.00 23.00 0.00 0.00
###
CER PLATINA ZINCADA 3/16"x3/4" kg 39.54% 0.13 47.00 47.00 19.00 19.00
###
CER PLANCHA DE ACERO ZINCADO 3/16" kg 28.18% 0.09 1.00 1.00 0.00 0.00
###
CER INSTALACION DE CONCERTINA m 2.87% 0.53 310.00 310.00 9.00 9.00
###
CER ACCESORIOS PARA POSTE DE CERCO GLB 51.05% 4.40 4.00 4.00 2.00 2.00
###
CER ACCESORIOS PARA PUERTA GLB 48.63% 4.40 4.00 4.00 2.00 2.00
###
CER MALLA GALVANIZADA #8 - 2"x2" kg 24.30% 0.23 1,774.00 1,774.00 431.00 431.00
###
CER SUMINISTRO, INSTALACION DE ALAMBRE DE PUAS N° 14 m 7.45% 0.08 201.00 201.00 15.00 15.00
###
CER INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES
CER INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 50.37% 0.09 75.00 75.00 38.00 38.00
###
CER PINTURA ###
CER PINTURA DE ELEMENTOS METALICOS m2 25.00% 0.44 1,528.00 1,528.00 382.00 382.00
###
PRE COMISIONAMIENTO ###
PRECOM C7000 PRE COMISIONAMIENTO DE EQUIPOS GLB 0.00% 770.00 770.00 770.00 0.00 0.00
###
COMISIONAMIENTO ###
COM C8000 COMISIONAMIENTO DE EQUIPOS GBL 0.00% 770.00 770.00 770.00 0.00 0.00
###
ADICIONALES
###
IDT01 RED DE DRENAJE SUPERFICIAL (IDT 1) ###
IDT01 OBRAS PRELIMINARES ###
IDT01 SEÑALIZACION DE LA ZONA DE TRABAJO GLB ###
IDT01 SDC01 SEÑALIZACION DE LA ZONA DE TRABAJO GLB 0.00% 25.00 750.00 750.00 0.00 0.00
###
IDT01 SDC01 TRAZO Y REPLANTEO GLB 0.00% 20.00 600.00 600.00 0.00 0.00
###
IDT01 DISCIPLINA: CIVIL ###
IDT01 MOVIMIENTO DE TIERRAS PARA TUBERÍAS, CANALES Y BUZONES - RED DE DRENAJE SUPERFICIAL ###
IDT01 SDC01 EXCAVACION CON EQUIPOS m3 0.00% 1.53 393.00 393.00 0.00 0.00
###
IDT01 SDC01 TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM<=1 KM m3 -KM 0.00% 0.16 4.00 4.00 0.00 0.00
###
IDT01 SDC01 TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 0.00% 0.04 6.00 6.00 0.00 0.00
###
IDT01 SDC01 COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 0.00% 3.42 83.00 83.00 0.00 0.00
###
IDT01 SDC01 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.00% 0.13 89.00 89.00 0.00 0.00
###
IDT01 SDC01 TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 0.00% 0.16 18.00 18.00 0.00 0.00
###
IDT01 SDC01 TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KM Ref.) m3 -KM 0.00% 0.04 30.00 30.00 0.00 0.00
###
IDT01 SDC01 RELLENO CON MATERIAL 2B DE PRESTAMO m3 0.00% 1.78 210.00 210.00 0.00 0.00
###
IDT01 SDC01 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 0.00% 2.03 120.00 120.00 0.00 0.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
IDT01 SDC01 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.00% 0.11 16.00 16.00 0.00 0.00
###
IDT01 SDC01 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.00% 0.05 60.00 60.00 0.00 0.00
###
IDT01 SDC01 MEJORAMIENTO CON MATERIAL GRANULAR m3 0.00% 0.62 39.00 39.00 0.00 0.00
###
IDT01 SDC01 EXCAVACION PARA BUZONES m3 0.00% 1.53 83.00 83.00 0.00 0.00
###
IDT01 CONCRETO SIMPLE PARA BUZONES DE AGUAS NEGRAS ###
IDT01 SDC01 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 Mpa m3 0.00% 6.18 5.00 5.00 0.00 0.00
###
IDT01 SDC01 CONCRETO ARMADO 0.00 0.00 0.00 0.00
IDT01 SDC01 COLOCACIÓN DE CONCRETO F'c=20 Mpa m3 0.00% 6.18 71.00 71.00 0.00 0.00
###
IDT01 SDC01 ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 2.47 177.00 177.00 0.00 0.00
###
IDT01 SDC01 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 Kg/cm2 kg 0.00% 0.12 105.00 105.00 0.00 0.00
###
IDT01 CARPINTERIA METÁLICA ###
IDT01 SDC01 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 1.35m x 1.35m INC. ACCESORIOS und 0.00% 6.75 27.00 27.00 0.00 0.00
###
IDT01 SDC01 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 3.20m x 2.20m INC. ACCESORIOS und 0.00% 14.00 14.00 14.00 0.00 0.00
###
IDT01 DISCIPLINA INSTALACIONES SANITARIAS ###
IDT01 INSTALACIÓN DE RED DE DRENAJE SUPERFICIAL - INSTALACIÓN 975-SD-18"-MOE03U-100031/100032/100033/100034
IDT01 SDC01 Pipe, PE D3350, Bell, Spg/End Ø 18" m 0.00% 1.44 183.00 183.00 0.00 0.00
###
IDT01 INSTALACIÓN DE RED DE DRENAJE SUPERFICIAL - INSTALACIÓN 975-SD-24"-MOE03U-100036
IDT01 SDC01 Pipe, PE D3350, Bell, Spg/End Ø 24" m 0.00% 1.44 6.00 6.00 0.00 0.00
###
IDT01 INSTALACIÓN DE RED DE DRENAJE SUPERFICIAL - INSTALACIÓN 975-SD-12"-MOE03U-100035
IDT01 SDC01 Pipe, PE D3350, PE, SDR21 Ø 12" m 0.00% 1.44 29.00 29.00 0.00 0.00
###
IDT01 CONEXIONADO DE TUBERIAS
IDT01 SDC01 CONEXIONADO DE TUBERIAS SDR Ø 18",Ø 24",Ø 12" und 0.00% 5.50 66.00 66.00 0.00 0.00
###
IDT02 IDT_02_CORTE DE TUBERIA Y PLATAFORMA ###
IDT02 OBRAS PRELIMINARES ###
IDT02 SDC06 SEÑALIZACION DE LA ZONA DE TRABAJO GLB 100.00% 750.00 0.00 750.00 0.00 750.00
###
IDT02 SDC06 MOVILIZACION Y DESMOVILIZACION GLB 100.00% 0.00 0.00 0.00 0.00 0.00
###
IDT02 SDC06 TRAZO Y REPLANTEO GLB 100.00% 600.00 0.00 600.00 0.00 600.00
###
IDT02 IDT 02. PARTE 1 - TUBERIA EXPUESTA ###
IDT02 SDC06 EXCAVACION CON EQUIPOS M3 100.00% 1.53 0.00 245.00 0.00 245.00
###
IDT02 SDC06 CORTE DE TUBERIA - SUPERIOR UND 100.00% 2.73 0.00 22.00 0.00 22.00
###
IDT02 SDC06 CORTE DE TUBERIA - INFERIOR UND 100.00% 2.73 0.00 22.00 0.00 22.00
###
IDT02 SDC06 TRASLADO DE TUBERIAS A ALMACEN DE CLIENTE viaje 100.00% 2.50 0.00 3.00 0.00 3.00
###
IDT02 SDC06 CAPACITACION DE AISLAMIENTOS, BLOQUEO Y SEÑALIZACION GLB 100.00% 0.00 0.00 0.00 0.00
###
IDT02 SDC06 BLOQUEO DE TUBERIA - INFERIOR (COLOCACION DE BRIDA CIEGA) GLB 100.00% 0.00 0.00 0.00 0.00
###
IDT02 SDC06 BLOQUEO DE TUBERIA - SUPERIOR (COLOCACION DE BRIDA CIEGA) GLB 100.00% 0.00 0.00 0.00 0.00
###
IDT02 SDC06 SELLADO DE TUBERIA - INFERIOR - INCL. DADO DE CONCRETO UND 100.00% 10.63 0.00 11.00 0.00 11.00
###
IDT02 SDC06 SELLADO DE TUBERIA - SUPERIOR - INCL. DADO DE CONCRETO UND 100.00% 10.63 0.00 11.00 0.00 11.00
###
IDT02 SDC06 TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3-km 100.00% 0.16 0.00 34.00 0.00 34.00
###
IDT02 SDC06 TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KM Ref.) m3-km 100.00% 0.04 0.00 54.00 0.00 54.00
###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
IDT02 SDC06 RELLENO CON MATERIAL 2B DE PRESTAMO M3 100.00% 1.78 0.00 387.00 0.00 387.00
###
IDT02 SDC06 PRUEBAS DE CALIDAD GLB 100.00% 0 0.00 0.00 0.00 0.00
###
IDT02 IDT 02. PARTE 2- PLATAFORMADO ###
IDT02 SDC06 EXCAVACION CON EQUIPOS M3 80.00% 1.53 0.00 1,064.00 0.00 852.00
###
IDT02 SDC06 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3-km 80.00% 0.05 0.00 127.00 0.00 102.00
###
IDT02 SDC06 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3-km 80.00% 0.11 0.00 104.00 0.00 83.00
###
IDT02 SDC06 TRANSPORTE DE MATERIAL GRANULAR TIPO 3B DM < = 1KM m3-km 80.00% 0.17 0.00 107.00 0.00 86.00
###
IDT02 SDC06 TRANSPORTE DE MATERIAL GRANULAR TIPO 3B DM > 1KM (Hasta 6.8 KM Ref.) m3-km 80.00% 0.04 0.00 180.00 0.00 144.00
###
IDT02 SDC06 RELLENO CON MATERIAL 3B DE PRESTAMO M3 80.00% 1.87 0.00 1,166.00 0.00 933.00
###
IDT02 SDC06 ENSAYOS DE MATERIAL 3B GLB 80.00% 0 0.00 0.00 0.00 0.00
###
IDT02 SDC06 TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3-km 80.00% 0.16 0.00 12.00 0.00 10.00
###
IDT02 SDC06 TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KM Ref.) m3-km 80.00% 0.04 0.00 19.00 0.00 16.00
###
IDT02 SDC06 RELLENO CON MATERIAL 2B DE PRESTAMO M3 80.00% 1.78 0.00 138.00 0.00 111.00
###
IDT02 SDC06 PRUEBAS DE COMPACTACIÓN, DE SELECCIÓN DE MATERIAL,ETC. GLB 80.00% 0.00 0.00 0.00 0.00
###
IDT03 IDT_03_SUBDREN ###
IDT03 OBRAS PRELIMINARES ###
IDT03 SDC10 SEÑALIZACION DE LA ZONA DE TRABAJO GLB 100.00% 750.00 0.00 750.00 0.00 750.00
###
IDT03 SDC10 TRAZO Y REPLANTEO GLB 100.00% 600.00 0.00 600.00 0.00 600.00
###
IDT03 IDT 02. PARTE 1 - TUBERIA EXPUESTA ###
IDT03 SDC10 EXCAVACION CON EQUIPOS M3 100.00% 1.53 0.00 675.00 0.00 675.00
###
IDT03 SDC10 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3-km 100.00% 0.05 0.00 81.00 0.00 81.00
###
IDT03 SDC10 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3-km 100.00% 0.11 0.00 66.00 0.00 66.00
###
IDT03 SDC10 TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= 1 KM m3-km 100.00% 0.16 0.00 2.00 0.00 2.00
###
IDT03 SDC10 TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM>1 KM (Hasta 6.8 KM Ref.) m3-km 100.00% 0.04 0.00 3.00 0.00 3.00
###
IDT03 SDC10 TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3-km 100.00% 0.16 0.00 12.00 0.00 12.00
###
IDT03 SDC10 TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KM Ref.) m3-km 100.00% 0.04 0.00 19.00 0.00 19.00
###
IDT03 SDC10 TRANSPORTE DE MATERIAL GRANULAR TIPO 3B DM < = 1KM m3-km 100.00% 0.17 0.00 37.00 0.00 37.00
###
IDT03 SDC10 TRANSPORTE DE MATERIAL GRANULAR TIPO 3B DM > 1KM (Hasta 6.8 KM Ref.) m3-km 100.00% 0.04 0.00 62.00 0.00 62.00
###
IDT03 SDC10 BOMBEO DE AGUA EN TERRENO SATURADO CON MOTOBOMBA Dias 100.00% 26.00 0.00 182.00 0.00 182.00
###
IDT03 SDC10 REFINE, NIVELACION Y PERFILADO DEL TERRENO M2 100.00% 0.13 0.00 84.00 0.00 84.00
###
IDT03 SDC10 TRASLADO DE TUBERIAS Y GEOTEXTIL viaje 100.00% 2.50 0.00 3.00 0.00 3.00
###
IDT03 SDC10 INSTALACIÓN DE GEOTEXTIL M2 100.00% 0.34 0.00 248.00 0.00 248.00
###
IDT03 SDC10 COLOCACION DE CAMA DE APOYO PARA TUBERÍA M3 100.00% 3.42 0.00 36.00 0.00 36.00
###
IDT03 SDC10 COLOCACION DE TUBERIA HDPE 12" M 100.00% 1.53 0.00 250.00 0.00 250.00
###
IDT03 SDC10 RELLENO CON MATERIAL 3B M3 100.00% 1.87 0.00 400.00 0.00 400.00
###
IDT03 SDC10 RELLENO CON MATERIAL 2B M3 100.00% 1.78 0.00 134.00 0.00 134.00
###
IDT03 SDC10 PRUEBAS GLB 100.00% 0 0.00 0.00 0.00 0.00
###
IDT08 MICROCLIMAS SDC09 ###
IDT08 OBRAS PRELIMINARES ###
DD
5 11 13 14 19 20 21 22 23 24
###
MOD ACTIVITY ID UNID. % AVANCE
DESCRIPCIÓN 
HH
UNITARIAS
HH
CONTRACTUAL
(C)
HH
PROYECTADA
(C)
HH GANADAS
CONTRACTUAL
EJECUTADA
(D)
HH GANADAS
PROYECTADA
EJECUTADA
(D)
H
H
C
O
N
T
R
A
C
T
U
A
L
E
J
E
C
U
T
A
D
A
(
F
)
A
B
S
O
L
U
T
O
IDT08 SDC08 MODULO D GLB 86.88% 50.00 0.00 600.00 0.00 521.00
###
IDT08 SDC08 MODULO B GLB 0.00% 40.00 0.00 320.00 0.00 0.00
###
IDT08 SDC08 MODULO C GLB 0.00% 40.00 0.00 120.00 0.00 0.00
###
IDT08 SDC08 MODULO E GLB 30.00% 40.00 0.00 600.00 0.00 180.00
###
IDT08 SDC08 MODULO T GLB 55.00% 40.00 0.00 160.00 0.00 88.00
###
IDT08 SDC08 MODULO A GLB 30.00% 40.00 0.00 600.00 0.00 180.00
###
IDT08 SDC08 MODULO OYP GLB 100.00% 40.00 0.00 600.00 0.00 600.00
###
IDT08 SDC08 MODULO M GLB 100.00% 40.00 0.00 120.00 0.00 120.00
###
IDT08 SDC08 MODULO N GLB 0.00% 40.00 0.00 120.00 0.00 0.00
###
IDT08 SDC08 MODULO S GLB 100.00% 40.00 0.00 320.00 0.00 320.00
###
IDT08 SDC08 MODULO R GLB 0.00% 40.00 0.00 120.00 0.00 0.00
###
IDT08 SDC08 MODULO L GLB 0.00% 40.00 0.00 600.00 0.00 0.00
###
IDT08 SDC08 MODULO K2 GLB 100.00% 40.00 0.00 320.00 0.00 320.00
###
IDT08 SDC08 MODULO K1 GLB 100.00% 40.00 0.00 320.00 0.00 320.00
###
IDT08 SDC08 MODULO F GLB 70.00% 40.00 0.00 240.00 0.00 168.00
###
IDT08 SDC08 MODULO G GLB 100.00% 40.00 0.00 240.00 0.00 240.00
###
IDT08 SDC08 MODULO H GLB 0.00% 40.00 0.00 240.00 0.00 0.00
###
IDT08 SDC08 MODULO I GLB 0.00% 40.00 0.00 240.00 0.00 0.00
###
IDT08 SDC08 REDES ELECTRICAS GLB 10.00% 40.00 0.00 800.00 0.00 80.00
###
IDT08 SDC08 CANAL PERIMETRAL GLB 0.00% 50.00 0.00 750.00 0.00 0.00
###
IDT08 SDC08 CERCO PERIMÉTRICO INTERIOR GLB 0.00% 40.00 0.00 800.00 0.00 0.00
###
IDT08 SDC08 CERCO PERIMÉTRICO EXTERIOR GLB 0.00% 40.00 0.00 800.00 0.00 0.00
###
IDT08 IDT_TALUD ###
IDT08 OBRAS PRELIMINARES ###
IDT08 SDC19 Trabajos de IDT Talud GLB 100.00% 600.00 0.00 600.00 0.00 600.00
###
X SUBTOTAL 109,890.00 138,886.00 47,842.00 66,801.00
BAC LB0_1 BAC LC4_1 ###
X %LB0 43.54%
LC4_1
###
X %LC4 48.06% 43.54% 48.10%
CONTRACTUAL
LB0
COMPAÑÍA MINERA ANTAMINA S.A
SEMANA N° 26
CURVA S - PATIO DE RESIDUOS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
1 S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S16 S17 S18 S19 S20 S21 S22 S23 S24 S25 S26 S27 S28 S29 S30 S31 S32 S33 S34 S35 S36 S37 S38 S39 S40 S41
2 6-May-21 13-May-21 20-May-21 27-May-21 3-Jun-21 10-Jun-21 17-Jun-21 24-Jun-21 1-Jul-21 8-Jul-21 15-Jul-21 22-Jul-21 29-Jul-21 5-Aug-21 12-Aug-21 19-Aug-21 26-Aug-21 2-Sep-21 9-Sep-21 16-Sep-21 23-Sep-21 30-Sep-21 7-Oct-21 14-Oct-21 21-Oct-21 28-Oct-21 4-Nov-21 11-Nov-21 18-Nov-21 25-Nov-21 2-Dec-21 9-Dec-21 16-Dec-21 23-Dec-21 30-Dec-21 6-Jan-22 13-Jan-22 20-Jan-22 27-Jan-22 3-Feb-22 10-Feb-22
3 Línea Base 0 Periodo 0 0 0 0 898 1130 1904 3051 3318 4241 5014 6719 9099 8900 9340 9022 9491 8017 7471 7350 4813 3853 2981 1956 666 449 193
4 Línea Base 0 Acum. 0 0 0 0 898 2028 3932 6983 10301 14542 19556 26275 35374 44274 53614 62636 72127 80144 87615 94965 99778 103631 106612 108568 109234 109683 109876
5 % Línea Base 0 Periodo 0.00% 0.00% 0.00% 0.00% 0.82% 1.03% 1.73% 2.78% 3.02% 3.86% 4.56% 6.12% 8.28% 8.10% 8.50% 8.21% 8.64% 7.30% 6.80% 6.69% 4.38% 3.51% 2.71% 1.78% 0.61% 0.41% 0.18%
6 % Línea Base 0 Acum 0.00% 0.00% 0.00% 0.00% 0.82% 1.85% 3.58% 6.36% 9.38% 13.23% 17.80% 23.91% 32.19% 40.29% 48.80% 57.01% 65.64% 72.94% 79.74% 86.43% 90.81% 94.32% 97.03% 98.81% 99.42% 99.82% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
7 Línea Control 1 Periodo 0 0 0 631 1262 1790 3636 4520 6265 10802 13165 13474 13502 14064 12938 10026 7264 3689 626 379 0 0 0 0 0 0 0
8 Línea Control 1 Acum 0 0 0 631 1893 3683 7319 11839 18104 28906 42071 55545 69047 83111 96049 106075 113339 117028 117654 118033 118033 118033 118033 118033 118033 118033 118033
9 % Línea Control 1 Periodo 0.00% 0.00% 0.00% 0.53% 1.07% 1.52% 3.08% 3.83% 5.31% 9.15% 11.15% 11.42% 11.44% 11.92% 10.96% 8.49% 6.15% 3.13% 0.53% 0.32% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
10 % Línea Control 1 Acum. 0.00% 0.00% 0.00% 0.53% 1.60% 3.12% 6.20% 10.03% 15.34% 24.49% 35.64% 47.06% 58.50% 70.41% 81.37% 89.87% 96.02% 99.15% 99.68% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
11 Línea Control 3 Periodo 0 0 0 0 104 167 425 526 521 658 669 750 1069 1285 1422 1644 2311 3036 5192 7520 9113 11375 11496 12414 14189 13892 11899 8034 4416 1044 449 295
12 Línea Control 3 Acum 0 0 0 0 104 271 696 1222 1743 2401 3070 3820 4889 6174 7596 9240 11551 14587 19779 27299 36412 47787 59283 71697 85886 99778 111677 119711 124127 125171 125620 125915
13 % Línea Control 3 Periodo 0.00% 0.00% 0.00% 0.00% 0.08% 0.13% 0.34% 0.42% 0.41% 0.52% 0.53% 0.60% 0.85% 1.02% 1.13% 1.31% 1.84% 2.41% 4.12% 5.97% 7.24% 9.03% 9.13% 9.86% 11.27% 11.03% 9.45% 6.38% 3.51% 0.83% 0.36% 0.23%
14 % Línea Control 3 Acum. 0.00% 0.00% 0.00% 0.00% 0.08% 0.22% 0.55% 0.97% 1.38% 1.91% 2.44% 3.03% 3.88% 4.90% 6.03% 7.34% 9.17% 11.58% 15.71% 21.68% 28.92% 37.95% 47.08% 56.94% 68.21% 79.24% 88.69% 95.07% 98.58% 99.41% 99.77% 100.00% 100.00% 100.00%
15 % Avance Real LC3 Periodo 0.00% 0.00% 0.00% 0.00% 0.23% 0.25% 0.36% 0.11% 0.49% 0.56% 1.02% 0.94% 1.31% 3.24% 2.20% 0.48% 1.98% 2.66% 1.10% 1.65% 1.07% 0.43% 4.41%
16 % Avance Real LC3 Acum. 0.00% 0.00% 0.00% 0.00% 0.23% 0.48% 0.84% 0.95% 1.44% 2.00% 3.02% 3.96% 5.27% 8.50% 10.71% 11.19% 13.16% 15.82% 16.92% 18.57% 19.64% 20.06% 24.47%
17 Línea Control 4 Periodo 0 0 0 0 286 314 458 145 613 703 1,286 1,181 1,647 4,077 2,772 607 2,489 3,347 1,382 2,075 1,346 538 6,130 6,357 6,750 6,497 8,267 11,390 12,301 12,326 11,354 10,798 9,961 9,718 1,883 0 0 0 0 0 0
18 Línea Control 4 Acum. 0 0 0 0 286 600 1,057 1,202 1,815 2,518 3,804 4,985 6,632 10,709 13,480 14,088 16,576 19,923 21,305 23,380 24,726 25,264 31,394 37,751 44,501 50,998 59,265 70,655 82,956 95,282 106,636 117,435 127,396 137,114 138,997 138,997 138,997 138,997 138,997 138,997 138,997
19 %Línea Control 4 Periodo 0.00% 0.00% 0.00% 0.00% 0.23% 0.25% 0.36% 0.11% 0.49% 0.56% 1.02% 0.94% 1.31% 3.24% 2.20% 0.48% 1.98% 2.66% 1.10% 1.65% 1.07% 0.43% 4.41% 4.57% 4.86% 4.67% 5.95% 8.19% 8.85% 8.87% 8.17% 7.77% 7.17% 6.99% 1.35% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
20 % Línea Control 4 Acum. 22.59% 27.16% 32.02% 36.69% 42.64% 50.83% 59.68% 68.55% 76.72% 84.49% 91.65% 98.65% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
21 Linea Real Periodo (LC4) 0 0 0 0 286 314 458 145 613 703 1,286 1,181 1,647 4,077 2,772 607 2,489 3,347 1,382 2,075 1,346 538 6,130 3,285 3,942 3,967 4,840 4,151 5,401 3,478 2,539 2,311 1,493
22 Linea Real Acum. (LC4) 0 0 0 0 286 600 1,057 1,202 1,815 2,518 3,804 4,985 6,632 10,709 13,480 14,088 16,576 19,923 21,305 23,380 24,726 25,264 31,394 34,679 38,621 42,588 47,428 51,579 56,980 60,458 62,997 65,308 66,801 66,801
23 Linea Real Periodo (LB0) 0 0 0 0 286 314 458 145 613 703 1,286 1,181 1,647 3,077 1,772 607 980 998 1,382 1,067 889 452 194 1,195 2,963 3,767 4,392 3,765 4,852 3,100 2,506 2,032 1,220
24 Linea Real Acum. (LB0) 0 0 0 0 286 600 1,057 1,202 1,815 2,518 3,804 4,985 6,632 9,709 11,481 12,088 13,068 14,066 15,448 16,515 17,404 17,856 18,050 19,245 22,208 25,975 30,367 34,132 38,984 42,084 44,590 46,622 47,842 47,842
25 % Avance Real LB0 Periodo 0.00% 0.00% 0.00% 0.00% 0.26% 0.29% 0.42% 0.13% 0.56% 0.64% 1.17% 1.07% 1.50% 2.80% 1.61% 0.55% 0.89% 0.91% 1.26% 0.97% 0.81% 0.41% 0.18% 1.09% 2.70% 3.43% 4.00% 3.43% 4.42% 2.82% 2.28% 1.85% 1.11%
26 % Avance Real LB0 Acum. 0.00% 0.00% 0.00% 0.00% 0.26% 0.55% 0.96% 1.09% 1.65% 2.29% 3.46% 4.54% 6.04% 8.84% 10.45% 11.00% 11.89% 12.80% 14.06% 15.03% 15.84% 16.25% 16.43% 17.52% 20.21% 23.64% 27.64% 31.06% 35.48% 38.30% 40.58% 42.43% 43.54%
27 % Avance Real LC4 Periodo 4.41% 2.61% 2.84% 2.85% 3.48% 2.99% 3.89% 2.50% 1.83% 1.66% 1.07%
28 % Avance Real LC4 Acum 22.59% 24.95% 27.79% 30.64% 34.12% 37.11% 40.99% 43.50% 45.32% 46.99% 48.06%
29 Linea Forecast Periodo 1.07% 1.42% 5.51% 10.54% 10.15% 7.89% 6.01% 3.65% 1.38%
30 % Avance Forecast 48.06% 49.48% 54.98% 65.52% 75.67% 83.56% 89.57% 93.22% 94.60%
31 HH gastadas Periodo 630 630 1820 1610 1610 1470 2030 1610 2170 1750 1120 2170 2170 3850 3850 3850 5460 5460 5600 6510 6300 5880 5320 5320 9940 9310
32 HH gastadas Acum 0 1260 3080 4690 6300 7770 9800 11410 13580 15330 16450 18620 20790 24640 28490 32340 37800 43260 48860 55370 61670 67550 72870 78190 88130 97440
33 HH Forecast 1493 1970 7654 14649 14107 10965 8351 5072 1920
9 9 26 23 23 21 29 23 31 25 16 31 31 55 55 55 78 78 80 93 90 84 76 76 142 133
70 630 630 1820 1610 1610 1470 2030 1610 2170 1750 1120 2170 2170 3850 3850 3850 5460 5460 5600 6510 6300 5880 5320 5320 9940 9310
1260 3080 4690 6300 7770 9800 11410 13580 15330 16450 18620 20790 24640 28490 32340 37800 43260 48860 55370 61670 67550 72870 78190 88130 97440 66,802.20 1,494.20
33
DESCRIPCIÓN
LB 0 LC 4
Planned Value (PV) 0.00 109,876.00 9,961.22 127,395.78
Earned Value (EV) 1,220.00 47,842.00 1,493.00 66,801.00
Schedule (SPI) 0 0.44 0.15 0.52
Schedule Variance (SV) 1,220.00 -62,034.00 -8,468.22 -60,594.78
HH gastadas 0.00 0.00 0 0
Labor Performance Index (LPI) 0.00 0.00 0.00 0.00
PERIODO
SEMANAL ACTUAL
PERIODO
SEMANAL
ACUMULADO
PERIODO
SEMANAL ACTUAL
PERIODO
SEMANAL
ACUMULADO
0
20000
40000
60000
80000
100000
120000
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
100.00%
Curva S - Patio de Residuos
Línea Base 0 Periodo Línea Control 1 Periodo HH gastadas Acum % Línea Base 0 Acum % Línea Control 1 Acum. % Línea Control 4 Acum. % Avance Real LC3 Acum. % Avance Forecast
0
2000
4000
6000
8000
10000
12000
14000
16000
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
CURVA "S" AVANCE FÍSICO
HH
ACUMULADAS
9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00###21.00 22.00 23.00 24.00 25.00 26.00 27.00 28.00 29.00 30.00 31.00 32.00 33.00 34.00 35.00
SEMANAL META SEMANAL CUMPLIDO
1 2 3 4 5 6 7 8 9 V S D L M M J V S D L M M J
# ACTIVIDAD UND HH META HH GANADAS
12/17/2021
12/18/2021
12/19/2021
12/20/2021
12/21/2021
12/22/2021
12/23/2021
12/17/2021
12/18/2021
12/19/2021
12/20/2021
12/21/2021
12/22/2021
12/23/2021
SI NO TIPO CAUSA DE INCUMPLIMIENTO MEDIDA CORRECTIVA
# SECTOR MÓDULO DESCRIPCIÓN UNID. Ratio LC4 39 40 41 42 43 44 45 39 40 41 42 43 44 45
3 0 0 CONSTRUCCIÓN
47 S5 0 SISTEMA DE RED DE AGUA POTABLE, AGUAS NEGRAS Y AGUAS GRISES
48 S5 RAP RED DE AGUA POTABLE
75.91 S5 RAP-A DISCIPLINA: CIVIL - 100037
75.92 S5 RAP-A MOVIMIENTO DE TIERRAS PARA TUBERÍAS Y PUNTOS DE AGUA- RED DE AGUA P
75.93 S5 RAP-A EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 1.45 0.77 1.11 0.77 - 1.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 1.00 PROG
75.95 S5 RAP-A REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.13 3.53 0.45 3.53 - 0.45 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00 PROG
75.96 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= 1 KM m3 -KM 0.16 0.24 0.04 0.24 - 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 1.00 PROG
75.97 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM (Hasta
m3 -KM 0.04 1.39 0.05 1.39 - 0.05 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 1.00 PROG
75.98 S5 RAP-A COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 3.42 0.27 0.91 0.27 - 0.91 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 1.00 PROG
75.99 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 0.16 0.95 0.15 0.95 - 0.15 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 1.00 PROG
75.100 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KM Ref.) m3 -KM 0.04 5.54 0.20 5.54 - 0.20 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 1.00 PROG
75.101 S5 RAP-A RELLENO CON MATERIAL 2B DE PRESTAMO m3 1.78 0.98 1.74 0.98 - 1.74 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 1.00 PROG
75.102 S5 RAP-A RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 2.03 1.93 3.91 1.93 - 3.91 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 1.00 PROG
75.103 S5 RAP-A ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.11 0.83 0.09 0.83 - 0.09 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 1.00 PROG
75.104 S5 RAP-A ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.05 1.64 0.08 1.64 - 0.08 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 1.00 PROG
75.105 S5 RAP-A APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.23 0.83 0.19 0.83 - 0.19 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 1.00 PROG
75.106 S5 RAP-A DISCIPLINA: CIVIL - 100038
75.107 S5 RAP-A MOVIMIENTO DE TIERRAS PARA TUBERÍAS Y PUNTOS DE AGUA- RED DE AGUA P
75.108 S5 RAP-A EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 1.45 0.64 0.92 0.64 - 0.92 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 1.00 PROG
75.110 S5 RAP-A REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.13 2.94 0.37 2.94 - 0.37 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 1.00 PROG
75.111 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= 1 KM m3 -KM 0.16 0.20 0.03 0.20 - 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 1.00 PROG
75.112 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM (Hasta
m3 -KM 0.04 1.16 0.04 1.16 - 0.04 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 1.00 PROG
75.113 S5 RAP-A COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 3.42 0.22 0.75 0.22 - 0.75 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 1.00 PROG
75.114 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 0.16 0.80 0.12 0.80 - 0.12 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 1.00 PROG
75.115 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KM Ref.) m3 -KM 0.04 4.62 0.17 4.62 - 0.17 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 1.00 PROG
75.116 S5 RAP-A RELLENO CON MATERIAL 2B DE PRESTAMO m3 1.78 0.82 1.45 0.82 - 1.45 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 1.00 PROG
75.117 S5 RAP-A RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 2.03 1.61 3.25 1.61 - 3.25 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 1.00 PROG
75.118 S5 RAP-A ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.11 0.69 0.08 0.69 - 0.08 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 1.00 PROG
75.119 S5 RAP-A ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.05 1.37 0.06 1.37 - 0.06 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 1.00 PROG
75.120 S5 RAP-A APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.23 0.69 0.16 0.69 - 0.16 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 1.00 PROG
75.121 S5 RAP-A DISCIPLINA: CIVIL - 100044 - 100049
75.122 S5 RAP-A MOVIMIENTO DE TIERRAS PARA TUBERÍAS Y PUNTOS DE AGUA- RED DE AGUA P
75.123 S5 RAP-A EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 1.45 1.27 1.84 1.27 - 1.84 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 1.00 PROG
75.125 S5 RAP-A REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.13 5.88 0.75 5.88 - 0.75 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 1.00 PROG
75.126 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= 1 KM m3 -KM 0.16 0.39 0.06 0.39 - 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 1.00 PROG
75.127 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM (Hasta
m3 -KM 0.04 2.31 0.08 2.31 - 0.08 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 1.00 PROG
75.128 S5 RAP-A COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 3.42 0.44 1.50 0.44 - 1.50 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 1.00 PROG
75.129 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 0.16 1.59 0.25 1.59 - 0.25 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 1.00 PROG
75.130 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KM Ref.) m3 -KM 0.04 9.23 0.34 9.23 - 0.34 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.00 PROG
75.131 S5 RAP-A RELLENO CON MATERIAL 2B DE PRESTAMO m3 1.78 1.63 2.89 1.63 - 2.89 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 1.00 PROG
75.132 S5 RAP-A RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 2.03 3.21 6.50 3.21 - 6.50 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 1.00 PROG
75.133 S5 RAP-A ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.11 1.38 0.16 1.38 - 0.16 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 1.00 PROG
75.134 S5 RAP-A ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.05 2.73 0.13 2.73 - 0.13 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 1.00 PROG
75.135 S5 RAP-A APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.23 1.37 0.32 1.37 - 0.32 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 1.00 PROG
359 S5 RAG RED DE AGUAS GRISES
360 S5 RAG DISCIPLINA: CIVIL
412.31 S5 RAG MOVIMIENTO DE TIERRAS PARA TUBERÍAS, BUZONES - RED DE AGUAS GRISES - LÍN
412.32 S5 RAG EXCAVACION PARA BUZONES m3 1.53 0.12 0.18 0.12 - 0.18 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 1.00 PROG
412.33 S5 RAG EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 1.45 3.51 5.10 3.51 - 5.10 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00 PROG
412.34 S5 RAG EXCAVACION PARA CAJAS DE REGISTRO Y DESARENADOR m3 6.20 0.07 0.41 0.07 - 0.41 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 1.00 PROG
412.35 S5 RAG REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.13 10.57 1.35 10.57 - 1.35 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.00 PROG
412.36 S5 RAG TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= 1 KM m3 -KM 0.16 0.54 0.08 0.54 - 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 1.00 PROG
412.37 S5 RAG TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM (Hasta
m3 -KM 0.04 4.18 0.15 4.18 - 0.15 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 1.00 PROG
412.38 S5 RAG COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 3.42 0.69 2.36 0.69 - 2.36 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 1.00 PROG
412.39 S5 RAG TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 0.16 2.62 0.41 2.62 - 0.41 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 1.00 PROG
412.40 S5 RAG TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KM Ref.) m3 -KM 0.04 15.21 0.56 15.21 - 0.56 2.17 2.17 2.17 2.17 2.17 2.17 2.17 2.17 2.17 2.17 2.17 2.17 2.17 2.17 1.00 PROG
412.41 S5 RAG RELLENO CON MATERIAL 2B DE PRESTAMO m3 1.78 2.39 4.25 2.39 - 4.25 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 1.00 PROG
412.42 S5 RAG RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 2.03 3.29 6.67 3.29 - 6.67 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 1.00 PROG
412.43 S5 RAG ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.11 7.24 0.83 7.24 - 0.83 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.00 PROG
412.44 S5 RAG ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.05 14.47 0.68 14.47 - 0.68 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 1.00 PROG
412.45 S5 RAG APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.23 6.19 1.45 6.19 - 1.45 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 1.00 PROG
413 S5 RAG DISCIPLINA: INSTALACIONES SANITARIAS
414 S5 RAG TUBERIAS
506 S5 RAG 975-PWU-6"-MDE0HU-100096
507 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.46 14.70 6.78 14.70 - 6.78 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 1.00 PROG
508 S5 RAG 975-PWU-6"-MDE0HU-100097
509 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.45 23.80 10.78 23.80 - 10.78 3.40 3.40 3.40 3.40 3.40 3.40 3.40 3.40 3.40 3.40 3.40 3.40 3.40 3.40 1.00 PROG
510 S5 RAG 975-PWU-6"-MDE0HU-100098 / 100099 / 1000100 / 1000101 / 1000102 / 1000103 / 100
511
S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.38 279.30 106.64 159.60 119.70 60.94 39.90 39.90 39.90 39.90 39.90 39.90 39.90 39.90 39.90 39.90 39.90 1.00 PROG REC SS.EE
832 S1 D MÓDULO D: ALMACÉN TEMPORAL DE RESIDUOS PELIGROSOS
833 S1 D DISCIPLINA: CIVIL
853 S1 B CONCRETO ARMADO
877 S1 D SARDINEL
878 S1 D COLOCACIÓN DE CONCRETO F'c=30 MPa m3 5.83 12.00 70.00 12.00 - 70.00 - - - - - 6.00 6.00 - - - - - 6.00 6.00 1.00 PROG
879 S1 D ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 2.47 86.00 212.47 86.00 - 212.47 - - - 43.00 43.00 - - - - - 43.00 43.00 - 1.00 PROG
880 S1 D SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 kg 0.12 132.16 15.42 132.16 - 15.42 - 66.08 66.08 - - - - - 66.08 66.08 - - - 1.00 PROG
1005 S1 0 MÓDULO E: RAMPA DE DESCARGA
1006 S1 E DISCIPLINA: CIVIL
1007 S1 E MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS
1010 S1 E EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 6.20 2.00 12.40 2.00 - 12.40 - - - - - - 2.00 - - - - - - 2.00 1.00 PROG
1022 S1 D CONCRETO ARMADO
SECTO
R
MÓDUL
O
HH
UNITARIO
METRADO
SEMANAL
META
METRADO
SEMANAL
CUMPLIDO
Metrado
no
cumplido
Responsabl
e
PROG / NO
PROG 3WLA
ATRIBUIBLE
SS.EE
NO
ATRIBUIBLE
SS.EE
No se contó con la retroexcavadora operativa
al 100% para liberar área y realiar el tendido de
tuberías
Se realizará la adquisición de equipo
que garantice su operatividad para
poder completar la ejecución de
trabajos
9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00###21.00 22.00 23.00 24.00 25.00 26.00 27.00 28.00 29.00 30.00 31.00 32.00 33.00 34.00 35.00
SEMANAL META SEMANAL CUMPLIDO
1 2 3 4 5 6 7 8 9 V S D L M M J V S D L M M J
# ACTIVIDAD UND HH META HH GANADAS
12/17/2021
12/18/2021
12/19/2021
12/20/2021
12/21/2021
12/22/2021
12/23/2021
12/17/2021
12/18/2021
12/19/2021
12/20/2021
12/21/2021
12/22/2021
12/23/2021
SI NO TIPO CAUSA DE INCUMPLIMIENTO MEDIDA CORRECTIVA
SECTO
R
MÓDUL
O
HH
UNITARIO
METRADO
SEMANAL
META
METRADO
SEMANAL
CUMPLIDO
Metrado
no
cumplido
Responsabl
e
PROG / NO
PROG 3WLA
ATRIBUIBLE
SS.EE
NO
ATRIBUIBLE
SS.EE
1030 S1 E LOSA
1032 S1 E ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 2.47 6.00 14.82 6.00 - 14.82 - - - - - - 6.00 - - - - - - 6.00 1.00 PROG
1033 S1 E SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 kg 0.12 557.61 65.05 557.61 - 65.05 - - - - - - ### - - - - - - 557.61 1.00 PROG
1225 S4 G MÓDULO G: REVEGETACIÓN
1256 S4 G ESTRUCTURAS METÁLICAS
1268 S4 G MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES
1269 S4 G INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS REUTILIZABLES kg 0.06 93.00 5.35 93.00 - 5.35 18.60 18.60 18.60 18.60 18.60 - - 18.60 18.60 18.60 18.60 18.60 - - 1.00 PROG
1270 S4 G INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES REUTILIZABLES kg 0.08 396.00 30.36 396.00 - 30.36 79.20 79.20 79.20 79.20 79.20 - - 79.20 79.20 79.20 79.20 79.20 - - 1.00 PROG
1271 S4 G INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE REUTIL kg 0.06 391.00 22.50 391.00 - 22.50 78.20 78.20 78.20 78.20 78.20 - - 78.20 78.20 78.20 78.20 78.20 - - 1.00 PROG
1272 S4 G INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS REUTILIZABLES kg 0.10 1,090.00 104.58 1,090.00 - 104.58 ### ### ### ### ### - - ### ### ### ### ### - - 1.00 PROG
1273 S4 G INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES REUTILIZABLE kg 0.12 112.00 12.89 112.00 - 12.89 22.40 22.40 22.40 22.40 22.40 - - 22.40 22.40 22.40 22.40 22.40 - - 1.00 PROG
1274 S4 G INSTALACIÓN E IZAJE DE CONTAINER REUTILIZABLE kg 0.06 8,300.00 456.50 8,300.00 - 456.50 ### ### ### ### ### - - ### ### ### ### ### - - 1.00 PROG
1275 S4 G INSTALACIÓN DE PUERTAS METALICAS REUTILIZABLE kg 0.11 140.00 15.75 140.00 - 15.75 - - - - - 70.00 70.00 - - - - - 70.00 70.00 1.00 PROG
1276 S4 G INSTALACIÓN COBERTURA DE TR-4 REUTILIZABLES m2 0.43 60.00 26.00 60.00 - 26.00 - - - - - 30.00 30.00 - - - - - 30.00 30.00 1.00 PROG
1277 S4 G INSTALACIÓN CERRAMIENTO TR-4 TRANSLUCIDO REUTILIZABLES m2 0.43 12.40 5.37 12.40 - 5.37 - - - - - 6.20 6.20 - - - - - 6.20 6.20 1.00 PROG
1278 S4 G MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS
1279 S4 G SUMINISTRO, INSTALACIÓN DE CUMBRERA
1281 S4 G INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJ
1282 S4 G INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 0.09 428.00 37.91 428.00 - 37.91 - - - ### ### ### ### - - - ### ### ### 107.00 1.00 PROG
1751 S3 N MÓDULO N: ALMACÉN DE SUSTANCIAS PELIGROSAS CASETA II
1766 S3 N ESTRUCTURAS METÁLICAS
1785 S3 N LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES
1786 S3 N LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 0.50 16.00 8.00 16.00 - 8.00 3.20 3.20 3.20 3.20 3.20 - - 3.20 3.20 3.20 3.20 3.20 - - 1.00 PROG
1787 S3 N PINTURA
1788 S3 N PINTURA DE ELEMENTOS METALICOS m2 0.44 87.00 38.06 87.00 - 38.06 17.40 17.40 17.40 17.40 17.40 - - 17.40 17.40 17.40 17.40 17.40 - - 1.00 PROG
1789 S3 N TRANSPORTE DE ELEMENTOS ESTRUCTURALES
1790 S3 N TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 0.02 86.51 1.42 86.51 - 1.42 12.36 12.36 12.36 12.36 12.36 12.36 12.36 12.36 12.36 12.36 12.36 12.36 12.36 12.36 1.00 PROG
1791 S3 O Y P MÓDULO O Y P: TALLER MECÁNICO Y DE PINTURA SOCIOS ESTRATÉGICOS
1849 S3 O Y P ESTRUCTURAS METÁLICAS
1892 S3 O Y P LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES
1893 S3 O Y P LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 0.50 9.51 4.75 9.51 - 4.75 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.00 PROG
1894 S3 O Y P PINTURA
1895 S3 O Y P PINTURA DE ELEMENTOS METALICOS m2 0.44 45.07 19.72 45.07 - 19.72 6.44 6.44 6.44 6.44 6.44 6.44 6.44 6.44 6.44 6.44 6.44 6.44 6.44 6.44 1.00 PROG
1896 S3 O Y P TRANSPORTE DE ELEMENTOS ESTRUCTURALES
1897 S3 O Y P TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 0.02 572.57 9.41 572.57 - 9.41 81.80 81.80 81.80 81.80 81.80 81.80 81.80 81.80 81.80 81.80 81.80 81.80 81.80 81.80 1.00 PROG
1971 S3 S MÓDULO S: CISTERNA
2009 S3 S ESTRUCTURAS METÁLICAS
2010 S3 S MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS
2011 S3 S SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS
2012
S3 S ACERO ESTRUCTURAL TUBO 3"x1 1/2"x4.5mm kg 0.12 83.98 9.67 50.39 33.59 5.80 16.80 16.80 16.80 16.80 16.80 - - 16.80 16.80 16.80 1.00 PROG MAT SS.EE
2013
S3 S ACERO ESTRUCTURAL PLANCHA 1/2" kg 0.06 5.47 0.35 3.28 2.19 0.21 1.09 1.09 1.09 1.09 1.09 - - 1.09 1.09 1.09 1.00 PROG MAT SS.EE
2014 S3 S SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES
2015
S3 S ACERO ESTRUCTURAL TUBO 3"x1 1/2"x4.5mm kg 0.12 90.00 10.36 54.00 36.00 6.21 18.00 18.00 18.00 18.00 18.00 - - 18.00 18.00 18.00 1.00 PROG MAT SS.EE
2016
S3 S ACERO ESTRUCTURAL ANGULO L-3"x3"x3/16" kg 0.12 2.01 0.23 1.21 0.80 0.14 0.40 0.40 0.40 0.40 0.40 - - 0.40 0.40 0.40 1.00 PROG MAT SS.EE
2017 S3 S SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRI
2018
S3 S ACERO ESTRUCTURAL TUBO 3"x1 1/2"x4.5mm kg 0.12 149.00 17.15 89.40 59.60 10.29 29.80 29.80 29.80 29.80 29.80 - - 29.80 29.80 29.80 1.00 PROG MAT SS.EE
2019 S3 S SUMINISTRO, INSTALACIÓN DE PANELES DE MALLA GALVANIZADA
2020
S3 S ACERO ESTRUCTURAL TUBO 1 1/2"x3/16" kg 0.12 55.00 6.33 33.00 22.00 3.80 11.00 11.00 11.00 11.00 11.00 - - 11.00 11.00 11.00 1.00 PROG MAT SS.EE
2021
S3 S MALLA GALVANIZADA #8 - 2"x2" kg 0.23 49.28 11.53 29.57 19.71 6.92 9.86 9.86 9.86 9.86 9.86 - - 9.86 9.86 9.86 1.00 PROG MAT SS.EE
2022 S3 S SUMINISTRO, INSTALACIÓN DE COBERTURA
2023
S3 S SUMINISTRO, INSTALACIÓN COBERTURA TR-4 m2 0.43 4.84 2.10 2.90 1.94 1.26 0.97 0.97 0.97 0.97 0.97 - - 0.97 0.97 0.97 1.00 PROG MAT SS.EE
2024 S3 S INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJ
2025
S3 S INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y ANCLAJES kg 0.09 29.00 2.57 17.40 11.60 1.54 5.80 5.80 5.80 5.80 5.80 - - 5.80 5.80 5.80 1.00 PROG MAT SS.EE
2026 S3 S PINTURA
2027 S3 S PINTURA DE ELEMENTOS METALICOS m2 0.44 29.20 12.78 29.20 - 12.78 5.84 5.84 5.84 5.84 5.84 - - 5.84 5.84 5.84 5.84 5.84 - - 1.00 PROG
2146 S5 0 INSTALACIONES ELECTRICAS EXTERNAS
2205 S2 T SUB ESTACIÓN DE 600KVA, 23/0.48/0.40-0.23KV, 4300msnm (INCLUYE MONTAJE Y SUM
2206 S2 T DISCIPLINA: CIVIL
2220 S2 T CONCRETO SIMPLE PARA DADOS DE CONCRETO
2221 S2 T COLOCACIÓN DE CONCRETO F'c=30 MPa m3 5.83 1.00 5.83 1.00 - 5.83 - - - - - - 1.00 - - - - - - 1.00 1.00 PROG
2311 S5 RDBT RED DE DISTRIBUCIÓN DE BAJA TENSIÓN
2330 S5 RDBT DISCIPLINA: INSTALACIONES ELÉCTRICAS
2331 S5 RDBT CANALIZACIONES, CONDUCTOS Y TUBERÍAS
2332
S5 RDBT SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.57 1.61 0.92 - 1.61 - - - - 0.40 0.40 0.40 0.40 1.00 PROG ACT-PRE NO SS.EE
2333
S5 RDBT SUMINISTRO E INSTALACIÓN DE TUBERIA PVC SCH40 Ø3" m 0.93 0.45 0.42 - 0.45 - - - - 0.11 0.11 0.11 0.11 1.00 PROG ACT-PRE NO SS.EE
No se contó con la aprobación de pernos Hilty
para realizar el ancalje de la estructura a la
losa de concreto
Se realizará la gestión para la
inmediata adquisición de pernos
para poder realizar el montaje
No se contó con la aprobación de pernos Hilty
para realizar el ancalje de la estructura a la
losa de concreto
Se realizará la gestión para la
inmediata adquisición de pernos
para poder realizar el montaje
No se contó con la aprobación de pernos Hilty
para realizar el ancalje de la estructura a la
losa de concreto
Se realizará la gestión para la
inmediata adquisición de pernos
para poder realizar el montaje
No se contó con la aprobación de pernos Hilty
para realizar el ancalje de la estructura a la
losa de concreto
Se realizará la gestión para la
inmediata adquisición de pernos
para poder realizar el montaje
No se contó con la aprobación de pernos Hilty
para realizar el ancalje de la estructura a la
losa de concreto
Se realizará la gestión para la
inmediata adquisición de pernos
para poder realizar el montaje
No se contó con la aprobación de pernos Hilty
para realizar el ancalje de la estructura a la
losa de concreto
Se realizará la gestión para la
inmediata adquisición de pernos
para poder realizar el montaje
No se contó con la aprobación de pernos Hilty
para realizar el ancalje de la estructura a la
losa de concreto
Se realizará la gestión para la
inmediata adquisición de pernos
para poder realizar el montaje
No se contó con la aprobación de pernos Hilty
para realizar el ancalje de la estructura a la
losa de concreto
Se realizará la gestión para la
inmediata adquisición de pernos
para poder realizar el montaje
No se contó con la aprobación de pernos Hilty
para realizar el ancalje de la estructura a la
losa de concreto
Se realizará la gestión para la
inmediata adquisición de pernos
para poder realizar el montaje
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00###21.00 22.00 23.00 24.00 25.00 26.00 27.00 28.00 29.00 30.00 31.00 32.00 33.00 34.00 35.00
SEMANAL META SEMANAL CUMPLIDO
1 2 3 4 5 6 7 8 9 V S D L M M J V S D L M M J
# ACTIVIDAD UND HH META HH GANADAS
12/17/2021
12/18/2021
12/19/2021
12/20/2021
12/21/2021
12/22/2021
12/23/2021
12/17/2021
12/18/2021
12/19/2021
12/20/2021
12/21/2021
12/22/2021
12/23/2021
SI NO TIPO CAUSA DE INCUMPLIMIENTO MEDIDA CORRECTIVA
SECTO
R
MÓDUL
O
HH
UNITARIO
METRADO
SEMANAL
META
METRADO
SEMANAL
CUMPLIDO
Metrado
no
cumplido
Responsabl
e
PROG / NO
PROG 3WLA
ATRIBUIBLE
SS.EE
NO
ATRIBUIBLE
SS.EE
2334
S5 RDBT SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø4" m 1.24 1.22 1.52 - 1.22 - - - - 0.31 0.31 0.31 0.31 1.00 PROG ACT-PRE NO SS.EE
2335
S5 RDBT SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø4" m 1.47 5.48 8.05 - 5.48 - - - - 1.37 1.37 1.37 1.37 1.00 PROG ACT-PRE NO SS.EE
2336
S5 RDBT SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø6" m 1.96 1.41 2.76 - 1.41 - - - - 0.35 0.35 0.35 0.35 1.00 PROG ACT-PRE NO SS.EE
2337
S5 RDBT SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.96 27.22 26.13 - 27.22 - - - - 6.80 6.80 6.80 6.80 1.00 PROG ACT-PRE NO SS.EE
2338
S5 RDBT SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.80 19.22 15.37 - 19.22 - - - - 4.80 4.80 4.80 4.80 1.00 PROG ACT-PRE NO SS.EE
2339
S5 RDBT SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 3"Ø m 1.52 0.49 0.74 - 0.49 - - - - 0.12 0.12 0.12 0.12 1.00 PROG ACT-PRE NO SS.EE
2340
S5 RDBT SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 1"Ø m 0.82 0.31 0.25 - 0.31 - - - - 0.08 0.08 0.08 0.08 1.00 PROG ACT-PRE NO SS.EE
2341
S5 RDBT SUMINISTRO E INSTALACIÓN DE TUBERIA RGS 4"Ø m 1.52 0.21 0.32 - 0.21 - - - - 0.05 0.05 0.05 0.05 1.00 PROG ACT-PRE NO SS.EE
2342
S5 RDBT SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 1.22 0.25 0.31 - 0.25 - - - - 0.06 0.06 0.06 0.06 1.00 PROG ACT-PRE NO SS.EE
2343 S5 RDBT CONDUCTORES Y CABLES DE ENERGIA
2344
S5 RDBT SUMINISTRO E INSTALACIÓN DE CABLE 4-1/c #350 Kcmil + GRD; XHHW-2, 0.6 Kv m 0.32 9.81 3.14 - 9.81 - - - - - - 4.91 4.91 1.00 PROG ACT-PRE NO SS.EE
2345
S5 RDBT SUMINISTRO E INSTALACIÓN DE CABLE 4-1/c #2 AWG + GRD; XHHW-2, 0.6 Kv m 0.32 9.22 2.95 - 9.22 - - - - - - 4.61 4.61 1.00 PROG ACT-PRE NO SS.EE
2346
S5 RDBT SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #4 AWG + GRD; XHHW-2, 0.6 Kv m 0.24 28.06 6.67 - 28.06 - - - - - - 14.03 14.03 1.00 PROG ACT-PRE NO SS.EE
2347
S5 RDBT SUMINISTRO E INSTALACIÓN DE CABLE 4-1/c #250 Kcmil + GRD; XHHW-2, 0.6 Kv m 0.32 22.37 7.23 - 22.37 - - - - - - 11.18 11.18 1.00 PROG ACT-PRE NO SS.EE
2348
S5 RDBT SUMINISTRO E INSTALACIÓN DE CABLE 4-1/c #350 Kcmil + GRD; XHHW-2, 0.6 Kv m 0.32 31.00 9.92 - 31.00 - - - - - - 15.50 15.50 1.00 PROG ACT-PRE NO SS.EE
2349
S5 RDBT SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #6 AWG + GRD; XHHW-2, 0.6 Kv m 0.29 3.43 0.99 - 3.43 - - - - - - 1.72 1.72 1.00 PROG ACT-PRE NO SS.EE
2350
S5 RDBT SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #12 AWG + GRD; XHHW-2, 0.6 Kv M 0.29 1.57 0.45 - 1.57 - - - - - - 0.78 0.78 1.00 PROG ACT-PRE NO SS.EE
2351
S5 RDBT SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #6 AWG + GRD; XHHW-2, 0.6 Kv m 0.24 3.73 0.89 - 3.73 - - - - - - 1.86 1.86 1.00 PROG ACT-PRE NO SS.EE
2352
S5 RDBT PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 204.00 0.05 10.04 - 0.05 - - - - - - 0.02 0.02 1.00 PROG ACT-PRE NO SS.EE
2352.58 S5 RDBT BANCODUCTO MÓDULO A
2352.59 S5 RDBT DISCIPLINA: CIVIL
2352.60 S5 RDBT MOVIMIENTO DE TIERRAS EN ACOMETIDA ELÉCTRICA Y EN REDES DE DISTRIBUC
2352.61 S5 RDBT EXCAVACION MASIVA CON EQUIPO m3 1.45 6.27 9.11 6.27 - 9.11 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 1.00 PROG
2352.62 S5 RDBT REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.13 59.48 7.58 59.48 - 7.58 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 1.00 PROG
2352.63 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 0.16 3.96 0.61 3.96 - 0.61 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 1.00 PROG
2352.64 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 0.04 22.93 0.84 22.93 - 0.84 3.28 3.28 3.28 3.28 3.28 3.28 3.28 3.28 3.28 3.28 3.28 3.28 3.28 3.28 1.00 PROG
2352.65 S5 RDBT RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 1.78 5.49 9.74 5.49 - 9.74 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 1.00 PROG
2352.66 S5 RDBT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 2.03 3.57 7.22 3.57 - 7.22 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 1.00 PROG
2352.67 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.11 6.41 0.74 6.41 - 0.74 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 1.00 PROG
2352.68 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.05 19.22 0.90 19.22 - 0.90 2.75 2.75 2.75 2.75 2.75 2.75 2.75 2.75 2.75 2.75 2.75 2.75 2.75 2.75 1.00 PROG
2352.69 S5 RDBT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.23 6.41 1.50 6.41 - 1.50 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 1.00 PROG
2352.118 S5 RDBT BANCODUCTO MÓDULO B
2352.119 S5 RDBT DISCIPLINA: CIVIL
2352.120 S5 RDBT MOVIMIENTO DE TIERRAS EN ACOMETIDA ELÉCTRICA Y EN REDES DE DISTRIBUC
2352.121 S5 RDBT EXCAVACION MASIVA CON EQUIPO m3 1.45 6.75 9.80 6.75 - 9.80 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 1.00 PROG
2352.122 S5 RDBT REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.13 64.05 8.17 64.05 - 8.17 9.15 9.15 9.15 9.15 9.15 9.15 9.15 9.15 9.15 9.15 9.15 9.15 9.15 9.15 1.00 PROG
2352.123 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 0.16 4.26 0.66 4.26 - 0.66 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 1.00 PROG
2352.124 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 0.04 24.69 0.91 24.69 - 0.91 3.53 3.53 3.53 3.53 3.53 3.53 3.53 3.53 3.53 3.53 3.53 3.53 3.53 3.53 1.00 PROG
2352.125 S5 RDBT RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 1.78 5.91 10.49 5.91 - 10.49 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 1.00 PROG
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
No se pudo realizar la conformación de camas
de apoyo para el tendido de tuberías y
condcutores por presencia de filtraciones que
dificultan el movimiento de tierras
Se realizará el mejoramiento de
fundaciones para evitar retrabajos
por saturación del terreno
9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00###21.00 22.00 23.00 24.00 25.00 26.00 27.00 28.00 29.00 30.00 31.00 32.00 33.00 34.00 35.00
SEMANAL META SEMANAL CUMPLIDO
1 2 3 4 5 6 7 8 9 V S D L M M J V S D L M M J
# ACTIVIDAD UND HH META HH GANADAS
12/17/2021
12/18/2021
12/19/2021
12/20/2021
12/21/2021
12/22/2021
12/23/2021
12/17/2021
12/18/2021
12/19/2021
12/20/2021
12/21/2021
12/22/2021
12/23/2021
SI NO TIPO CAUSA DE INCUMPLIMIENTO MEDIDA CORRECTIVA
SECTO
R
MÓDUL
O
HH
UNITARIO
METRADO
SEMANAL
META
METRADO
SEMANAL
CUMPLIDO
Metrado
no
cumplido
Responsabl
e
PROG / NO
PROG 3WLA
ATRIBUIBLE
SS.EE
NO
ATRIBUIBLE
SS.EE
2352.126 S5 RDBT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 2.03 3.84 7.78 3.84 - 7.78 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 1.00 PROG
2352.127 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.11 6.90 0.79 6.90 - 0.79 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 1.00 PROG
2352.128 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.05 20.70 0.97 20.70 - 0.97 2.96 2.96 2.96 2.96 2.96 2.96 2.96 2.96 2.96 2.96 2.96 2.96 2.96 2.96 1.00 PROG
2352.129 S5 RDBT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.23 6.90 1.62 6.90 - 1.62 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 1.00 PROG
2352.130 S5 RDBT BANCODUCTO MÓDULO C
2352.131 S5 RDBT DISCIPLINA: CIVIL
2352.132 S5 RDBT MOVIMIENTO DE TIERRAS EN ACOMETIDA ELÉCTRICA Y EN REDES DE DISTRIBUC
2352.133 S5 RDBT EXCAVACION MASIVA CON EQUIPO m3 1.45 3.00 4.36 3.00 - 4.36 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 1.00 PROG
2352.134 S5 RDBT REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.13 28.47 3.63 28.47 - 3.63 4.07 4.07 4.07 4.07 4.07 4.07 4.07 4.07 4.07 4.07 4.07 4.07 4.07 4.07 1.00 PROG
2352.135 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 0.16 1.89 0.29 1.89 - 0.29 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 1.00 PROG
2352.136 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 0.04 10.97 0.40 10.97 - 0.40 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.57 1.00 PROG
2352.137 S5 RDBT RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 1.78 2.63 4.67 2.63 - 4.67 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 1.00 PROG
2352.138 S5 RDBT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 2.03 1.71 3.46 1.71 - 3.46 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 1.00 PROG
2352.139 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.11 3.07 0.35 3.07 - 0.35 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 1.00 PROG
2352.140 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.05 9.20 0.43 9.20 - 0.43 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.00 PROG
2352.141 S5 RDBT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.23 3.07 0.72 3.07 - 0.72 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 1.00 PROG
2372.21 S5 BBEE BUZÓN 1002
2372.22 S5 BBEE DISCIPLINA: CIVIL
2372.23 S5 BBEE MOVIMIENTO DE TIERRAS EN BUZONES ELÉCTRICOS
2372.24 S5 BBEE EXCAVACIÓN PARA BUZONES ELÉCTRICOS m3 1.53 0.30 0.46 0.30 - 0.46 0.10 0.10 0.10 - - - - 0.10 0.10 0.10 - - - - 1.00 PROG
2372.25 S5 BBEE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.13 0.87 0.11 0.87 - 0.11 0.29 0.29 0.29 - - - - 0.29 0.29 0.29 - - - - 1.00 PROG
2372.26 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 0.16 0.04 0.01 0.04 - 0.01 0.01 0.01 0.01 - - - - 0.01 0.01 0.01 - - - - 1.00 PROG
2372.27 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 0.04 0.18 0.01 0.18 - 0.01 0.06 0.06 0.06 - - - - 0.06 0.06 0.06 - - - - 1.00 PROG
2372.28 S5 BBEE FILTRO DE GRAVA 1/2" m3 2.73 0.03 0.08 0.03 - 0.08 0.01 0.01 0.01 - - - - 0.01 0.01 0.01 - - - - 1.00 PROG
2372.29 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.11 0.35 0.04 0.35 - 0.04 0.12 0.12 0.12 - - - - 0.12 0.12 0.12 - - - - 1.00 PROG
2372.30 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.05 0.76 0.04 0.76 - 0.04 0.25 0.25 0.25 - - - - 0.25 0.25 0.25 - - - - 1.00 PROG
2372.31 S5 BBEE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.23 0.37 0.09 0.37 - 0.09 0.12 0.12 0.12 - - - - 0.12 0.12 0.12 - - - - 1.00 PROG
2372.32 S5 BBEE CONCRETO SIMPLE
2372.33 S5 BBEE CONCRETO ARMADO EN BUZONES ELÉCTRICOS
2372.34 S5 BBEE SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=420kg 0.12 70.08 8.18 70.08 - 8.18 - - - 70.08 - - - - - - 70.08 - - - 1.00 PROG
2372.35 S5 BBEE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 2.47 11.76 29.05 11.76 - 29.05 - - - 11.76 - - - - - - 11.76 - - - 1.00 PROG
2372.36 S5 BBEE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 6.18 1.59 9.82 1.59 - 9.82 - - - 1.59 - - - - - - 1.59 - - - 1.00 PROG
2372.37 S5 BBEE CURADO DE CONCRETO CON ADITIVO
2372.38 S5 BBEE CURADO DE CONCRETO CON ANTISOL m2 0.14 21.62 2.97 21.62 - 2.97 - - - - - - 21.62 - - - - - - 21.62 1.00 PROG
2372.101 S5 BBEE BUZÓN 1006
2372.102 S5 BBEE DISCIPLINA: CIVIL
2372.103 S5 BBEE MOVIMIENTO DE TIERRAS EN BUZONES ELÉCTRICOS
2372.112 S5 BBEE CONCRETO SIMPLE
2372.113 S5 BBEE CONCRETO ARMADO EN BUZONES ELÉCTRICOS
2372.114 S5 BBEE SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=420kg 0.12 53.39 6.23 53.39 - 6.23 - - 26.70 26.70 - - - - - 26.70 26.70 - - - 1.00 PROG
2372.115 S5 BBEE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 2.47 8.96 22.14 8.96 - 22.14 - - - - 8.96 - - - - - - 8.96 - - 1.00 PROG
2372.116 S5 BBEE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 6.18 1.59 9.82 1.59 - 9.82 - - - - - 1.59 - - - - - - 1.59 - 1.00 PROG
2372.117 S5 BBEE CURADO DE CONCRETO CON ADITIVO
2372.141 S5 BBEE BUZÓN 1008
2372.142 S5 BBEE DISCIPLINA: CIVIL
2372.143 S5 BBEE MOVIMIENTO DE TIERRAS EN BUZONES ELÉCTRICOS
2372.144 S5 BBEE EXCAVACIÓN PARA BUZONES ELÉCTRICOS m3 1.53 0.39 0.59 0.39 - 0.59 0.13 0.13 0.13 - - - - 0.13 0.13 0.13 - - - - 1.00 PROG
2372.145 S5 BBEE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.13 1.11 0.14 1.11 - 0.14 0.37 0.37 0.37 - - - - 0.37 0.37 0.37 - - - - 1.00 PROG
2372.146 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 0.16 0.05 0.01 0.05 - 0.01 0.02 0.02 0.02 - - - - 0.02 0.02 0.02 - - - - 1.00 PROG
2372.147 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 0.04 0.23 0.01 0.23 - 0.01 0.08 0.08 0.08 - - - - 0.08 0.08 0.08 - - - - 1.00 PROG
2372.148 S5 BBEE FILTRO DE GRAVA 1/2" m3 2.73 0.04 0.11 0.04 - 0.11 0.01 0.01 0.01 - - - - 0.01 0.01 0.01 - - - - 1.00 PROG
2372.149 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.11 0.45 0.05 0.45 - 0.05 0.15 0.15 0.15 - - - - 0.15 0.15 0.15 - - - - 1.00 PROG
2372.150 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.05 0.96 0.04 0.96 - 0.04 0.32 0.32 0.32 - - - - 0.32 0.32 0.32 - - - - 1.00 PROG
2372.151 S5 BBEE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.23 0.47 0.11 0.47 - 0.11 0.16 0.16 0.16 - - - - 0.16 0.16 0.16 - - - - 1.00 PROG
2372.152 S5 BBEE CONCRETO SIMPLE
2372.153 S5 BBEE CONCRETO ARMADO EN BUZONES ELÉCTRICOS
2372.154 S5 BBEE SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=420kg 0.12 70.08 8.18 70.08 - 8.18 - - - 70.08 - - - - - - 70.08 - - - 1.00 PROG
2372.155
S5 BBEE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 2.47 11.76 29.05 - 11.76 - - - - 11.76 - - - 1.00 PROG ACT-PRE NO SS.EE
2372.156
S5 BBEE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 6.18 1.59 9.82 - 1.59 - - - - 1.59 - - - 1.00 PROG ACT-PRE NO SS.EE
2372.157 S5 BBEE CURADO DE CONCRETO CON ADITIVO
2372.158
S5 BBEE CURADO DE CONCRETO CON ANTISOL m2 0.14 7.21 0.99 - 7.21 - - - - - - - 7.21 1.00 PROG ACT-PRE NO SS.EE
2372.181 S5 BBEE BUZÓN 1010
2372.182 S5 BBEE DISCIPLINA: CIVIL
2372.183 S5 BBEE MOVIMIENTO DE TIERRAS EN BUZONES ELÉCTRICOS
2372.184 S5 BBEE EXCAVACIÓN PARA BUZONES ELÉCTRICOS m3 1.53 0.41 0.63 0.41 - 0.63 0.14 0.14 0.14 - - - - 0.14 0.14 0.14 - - - - 1.00 PROG
2372.185 S5 BBEE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.13 1.16 0.15 1.16 - 0.15 0.39 0.39 0.39 - - - - 0.39 0.39 0.39 - - - - 1.00 PROG
2372.186 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 0.16 0.05 0.01 0.05 - 0.01 0.02 0.02 0.02 - - - - 0.02 0.02 0.02 - - - - 1.00 PROG
2372.187 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 0.04 0.20 0.01 0.20 - 0.01 0.07 0.07 0.07 - - - - 0.07 0.07 0.07 - - - - 1.00 PROG
2372.188 S5 BBEE FILTRO DE GRAVA 1/2" m3 2.73 0.04 0.11 0.04 - 0.11 0.01 0.01 0.01 - - - - 0.01 0.01 0.01 - - - - 1.00 PROG
2372.189 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.11 0.47 0.05 0.47 - 0.05 0.16 0.16 0.16 - - - - 0.16 0.16 0.16 - - - - 1.00 PROG
2372.190 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.05 1.01 0.05 1.01 - 0.05 0.34 0.34 0.34 - - - - 0.34 0.34 0.34 - - - - 1.00 PROG
2372.191 S5 BBEE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.23 0.49 0.12 0.49 - 0.12 0.16 0.16 0.16 - - - - 0.16 0.16 0.16 - - - - 1.00 PROG
2372.192 S5 BBEE CONCRETO SIMPLE
2372.193 S5 BBEE CONCRETO ARMADO EN BUZONES ELÉCTRICOS
2372.194 S5 BBEE SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=420kg 0.12 70.08 8.18 70.08 - 8.18 - - - 70.08 - - - - - - 70.08 - - - 1.00 PROG
2372.195 S5 BBEE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 2.47 11.76 29.05 11.76 - 29.05 - - - 11.76 - - - - - - 11.76 - - - 1.00 PROG
2372.196
S5 BBEE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 6.18 1.59 9.82 - 1.59 - - - - 1.59 - - - 1.00 PROG ACT-PRE NO SS.EE
2372.197 S5 BBEE CURADO DE CONCRETO CON ADITIVO
2372.198
S5 BBEE CURADO DE CONCRETO CON ANTISOL m2 0.14 21.62 2.97 - 21.62 - - - - - - - 21.62 1.00 PROG ACT-PRE NO SS.EE
Presencia de roca de mayor tamaño que
interfiere con ManHole
Se presentó Red Line para
modificación de ubicación de
MH1008
Presencia de roca de mayor tamaño que
interfiere con ManHole
Se presentó Red Line para
modificación de ubicación de
MH1008
Presencia de roca de mayor tamaño que
interfiere con ManHole
Se presentó Red Line para
modificación de ubicación de
MH1008
Presencia de filtraciones no pluviales dificultan
los trabajos de liberación de fundaciones
Se realizaron calzaduras para
mejorar el sostenimiento de los
taludes de la excavación
Presencia de filtraciones no pluviales dificultan
los trabajos de liberación de fundaciones
Se realizaron calzaduras para
mejorar el sostenimiento de los
taludes de la excavación
9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00###21.00 22.00 23.00 24.00 25.00 26.00 27.00 28.00 29.00 30.00 31.00 32.00 33.00 34.00 35.00
SEMANAL META SEMANAL CUMPLIDO
1 2 3 4 5 6 7 8 9 V S D L M M J V S D L M M J
# ACTIVIDAD UND HH META HH GANADAS
12/17/2021
12/18/2021
12/19/2021
12/20/2021
12/21/2021
12/22/2021
12/23/2021
12/17/2021
12/18/2021
12/19/2021
12/20/2021
12/21/2021
12/22/2021
12/23/2021
SI NO TIPO CAUSA DE INCUMPLIMIENTO MEDIDA CORRECTIVA
SECTO
R
MÓDUL
O
HH
UNITARIO
METRADO
SEMANAL
META
METRADO
SEMANAL
CUMPLIDO
Metrado
no
cumplido
Responsabl
e
PROG / NO
PROG 3WLA
ATRIBUIBLE
SS.EE
NO
ATRIBUIBLE
SS.EE
2456.30 S5 SPT SISTEMA DE PUESTA A TIERRA - SECTOR 2: A, T
2456.31 S5 SPT DISCIPLINA: CIVIL
2456.32 S5 SPT MOVIMIENTO DE TIERRAS PARA SISTEMA DE PUESTA A TIERRA Y PROTECCION
2456.33 S5 SPT EXCAVACIÓN PARA MALLAS Y POZOS DE PUESTA A TIERRA m3 6.20 2.48 15.36 2.48 - 15.36 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 1.00 PROG
2456.34 S5 SPT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 2.03 1.25 2.54 1.25 - 2.54 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 1.00 PROG
2456.35 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 0.16 1.12 0.17 1.12 - 0.17 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 1.00 PROG
2456.36 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 0.04 6.48 0.24 6.48 - 0.24 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 1.00 PROG
2456.37 S5 SPT RELLENO PARA MALLAS Y POZOS DE PUESTA A TIERRA CON TOP SOIL CERNID m3 2.70 1.15 3.10 1.15 - 3.10 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 1.00 PROG
2456.38 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.11 1.54 0.18 1.54 - 0.18 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 1.00 PROG
2456.39 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.05 3.07 0.14 3.07 - 0.14 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 1.00 PROG
2456.40 S5 SPT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.23 1.54 0.36 1.54 - 0.36 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 1.00 PROG
2456.59 S5 SPT SISTEMA DE PUESTA A TIERRA - SECTOR 4: F, G, H, I, K1
2456.60 S5 SPT DISCIPLINA: CIVIL
2456.61 S5 SPT MOVIMIENTO DE TIERRAS PARA SISTEMA DE PUESTA A TIERRA Y PROTECCION
2456.62 S5 SPT EXCAVACIÓN PARA MALLAS Y POZOS DE PUESTA A TIERRA m3 6.20 3.94 24.40 3.94 - 24.40 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 1.00 PROG
2456.63 S5 SPT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 2.03 1.99 4.02 1.99 - 4.02 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 1.00 PROG
2456.64 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 0.16 1.78 0.28 1.78 - 0.28 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 1.00 PROG
2456.65 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 0.04 10.30 0.38 10.30 - 0.38 1.47 1.47 1.47 1.47 1.47 1.47 1.47 1.47 1.47 1.47 1.47 1.47 1.47 1.47 1.00 PROG
2456.66 S5 SPT RELLENO PARA MALLAS Y POZOS DE PUESTA A TIERRA CON TOP SOIL CERNID m3 2.70 1.37 3.69 1.37 - 3.69 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 1.00 PROG
2456.67 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.11 2.44 0.28 2.44 - 0.28 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 1.00 PROG
2456.68 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.05 4.87 0.23 4.87 - 0.23 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 1.00 PROG
2456.69 S5 SPT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.23 2.44 0.57 2.44 - 0.57 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 1.00 PROG
2649 SDC 0 MICROCLIMAS SDC09
2650 SDC 0 OBRAS PRELIMINARES
2651 SDC SDC08 MODULO D GLB 50.00 1.58 79.00 1.58 - 79.00 1.58 - - - - - - 1.58 - - - - - - 1.00 PROG
3 0 0 ACTIVIDADES NO PROGRAMADAS EJECUTADAS
2372.81 S5 BBEE BUZÓN 1005
2372.82 S5 BBEE DISCIPLINA: CIVIL
2372.83 S5 BBEE MOVIMIENTO DE TIERRAS EN BUZONES ELÉCTRICOS
2372.84 S5 BBEE EXCAVACIÓN PARA BUZONES ELÉCTRICOS m3 1.53 - - 0.45 - 0.45 0.69 0.45 NO PROG
2372.85 S5 BBEE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.13 - - 1.29 - 1.29 0.16 1.29 NO PROG
2372.86 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 0.16 - - 0.05 - 0.05 0.01 0.05 NO PROG
2372.87 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM Ref.) m3 -KM 0.04 - - 0.23 - 0.23 0.01 0.23 NO PROG
2372.88 S5 BBEE FILTRO DE GRAVA 1/2" m3 2.73 - - 0.04 - 0.04 0.11 0.04 NO PROG
2372.89 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.11 - - 0.52 - 0.52 0.06 0.52 NO PROG
2372.90 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.05 - - 1.12 - 1.12 0.05 1.12 NO PROG
2372.91 S5 BBEE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.23 - - 0.54 - 0.54 0.13 0.54 NO PROG
2372.92 S5 BBEE CONCRETO SIMPLE
2372.93 S5 BBEE CONCRETO ARMADO EN BUZONES ELÉCTRICOS
2372.94 S5 BBEE SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=420kg 0.12 - - 70.08 - 70.08 8.18 70.08 NO PROG
2372.95 S5 BBEE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 2.47 - - 11.76 - 11.76 29.05 11.76 NO PROG
2372.96 S5 BBEE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 6.18 - - 1.59 - 1.59 9.82 1.59 NO PROG
2372.97 S5 BBEE CURADO DE CONCRETO CON ADITIVO
2372.98 S5 BBEE CURADO DE CONCRETO CON ANTISOL m2 0.14 - - 21.62 - 21.62 2.97 21.62 NO PROG
1005 S1 0 MÓDULO E: RAMPA DE DESCARGA
1006 S1 E DISCIPLINA: CIVIL
1022 S1 D CONCRETO ARMADO
1030 S1 E LOSA
1032 S1 E ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 2.47 - - 6.00 - 6.00 14.82 6.00 NO PROG
1033 S1 E SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 kg 0.12 - - 557.61 - 557.61 65.05 ### NO PROG
1034 S1 E MUROS
1036 S1 E ENCOFRADO CARAVISTA Y DESENCOFRADO DE MURO m2 3.50 - - 59.67 - 59.67 208.83 29.83 29.83 NO PROG
1037 S1 E SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=4200 kg 0.12 - - 160.57 - 160.57 18.73 ### NO PROG
36 36 36 36 36 36 36 36 36 36 36 36 36 36
138,886.00 1,968.50 1.42% 2,105.64 154 35 189
16
1.52% Porcentaje cumplid
Restriccion actual Acumulado
154.00 35.00 CLI-MAT CLIENTE - MATERIALES 0 0
CLI-ING CLIENTE - INGENIERÍA 0 1
PAC PROG 81.5% CLI-PRI CLIENTE - PRIORIDADES 0 4
CLI-CAM CLIENTE - CAMBIO 0 0
%PAE 82.9% MAT MATERIALES 9 13
REC RECURSOS 1 18
EP ERROR PLANIFICACION 0 3
DOC DOCUMENTACION TECNICA 0 5
ACT-PRE ACTIVIDADES PREVIAS 25 135
EXT EXTERNO 0 57
SC SUBCONTRATAS 0 2
EJEC ERRORES DE INGENIERÍA 0 1
QA/QC CONTROL DE CALIDAD 0 0
Responsable de restriccion Acumulado
SS.EE 10 192
NO SS.EE 25 50
TOTAL
ES
NO
PROG
Restricciones acumuladas
CLIENTE - MATERIALES
CLIENTE - INGENIERÍA
SS.EE
29%
Atribuible
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
0 0
0.666666666666667
0.538461538461538
0.571428571428571
0.466666666666667
0.85
0.80952380952381
0.657142857142857
0.361111111111111
0.821428571428571
0.485714285714286
0.42
0.768115942028986
0.745454545454546
0.666666666666667
0.384615384615385
0.452380952380952
0.543859649122807
0.5
0.666666666666667
P% PAC: Porcentaje de
Actividades Completadas
9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00###21.00 22.00 23.00 24.00 25.00 26.00 27.00 28.00 29.00 30.00 31.00 32.00 33.00 34.00 35.00
SEMANAL META SEMANAL CUMPLIDO
1 2 3 4 5 6 7 8 9 V S D L M M J V S D L M M J
# ACTIVIDAD UND HH META HH GANADAS
12/17/2021
12/18/2021
12/19/2021
12/20/2021
12/21/2021
12/22/2021
12/23/2021
12/17/2021
12/18/2021
12/19/2021
12/20/2021
12/21/2021
12/22/2021
12/23/2021
SI NO TIPO CAUSA DE INCUMPLIMIENTO MEDIDA CORRECTIVA
SECTO
R
MÓDUL
O
HH
UNITARIO
METRADO
SEMANAL
META
METRADO
SEMANAL
CUMPLIDO
Metrado
no
cumplido
Responsabl
e
PROG / NO
PROG 3WLA
ATRIBUIBLE
SS.EE
NO
ATRIBUIBLE
SS.EE
CLIENTE - INGENIERÍA ; 1; 0%
CLIENTE - PRIORIDADES ; 4; 2%
MATERIALES; 13; 6%
ERROR PLANIFICACION; 3; 1%
DOCUMENTACION TECNICA; 5; 2%
ACTIVIDADES PREVIAS ; 135; 61%
ERRORES DE INGENIERÍA; 1; 0%
Restricciones acumuladas
CLIENTE - MATERIALES
CLIENTE - INGENIERÍA
CLIENTE - PRIORIDADES
CLIENTE - CAMBIO
MATERIALES
ERROR PLANIFICACION
DOCUMENTACION TECNICA
ACTIVIDADES PREVIAS
EXTERNO
SUBCONTRATAS
ERRORES DE INGENIERÍA
CONTROL DE CALIDAD
SS.EE
29%
NO SS.EE
71%
Atribuible
SS.EE
NO SS.EE
1 ESTADO DEL PROYECTO – CURVA S
2) 3WLA – REPORTE DE AVANCE Y PROYECCIÓN 3) PROGRESO DE LA SEMANA / ACUM HH 4) PAC - PORCENTAJE DE ACTIVIDADES COMPLETADAS 4) PROGRESO DE SEMANA 3WLA vs Real - Commodities
SEMA 22 Actualizar EX
PERIO ### ### CON
EM
HH PERIODO HH ACUMULADO IMPUTABILIDAD % IMPUTABILIDAD Proyectado
PROYECTO TOTAL HH LB TOTAL HH LC4 PLAN LB PLAN LC4 8WLA GANADO PLAN LB PLAN LC4 %PLAN LB %PLAN LC4 PROYECTO Prog Real ENP PAE PAC Acum SSEE NO SSEE SSEE NO SSEE ÍTEM DESCRIPCIÓN UND Sem 34 Sem 35 Sem 36 Sem 37 Sem 38 Sem 39 Sem 40 Sem 41
PATIO DE RESIDUOS 109,876 138,997 - 9,961.22 1,968.50 1,493.00 109,876.00 127,395.78 47,842.00 66,801.00 100.00% 91.65% 43.54% 48.06% PATIO DE RESIDUOS 189 154 1,649 1,026 16 81.5% 82.9% 59.7% 10 25 29% 71% S1 SECTOR 1
3359.675045 SECTOR 1
19011.00 24495.00 - 2,376.00 4,132.54 509.00 19,011.00 13,750.00 6,251.00 8,480.00 100.00% 56.13% 32.88% 34.62%
S1 EXC EXCAVACIÓN (m3) m3 - - - - - - - -
988.3442296 SECTOR 2
13048.00 13049.00 - 1,435.00 193.88 582.00 13,048.00 6,595.00 4,198.00 4,646.00 100.00% 50.54% 32.17% 35.60% ACUMULADO
S1 CON CONCRETO (m3) m3 - - - - - - - -
3870.948996 SECTOR 3
26205.00 26206.00 - 3,427.00 445.93 336.00 26,205.00 13,682.00 9,454.00 9,451.00 100.00% 52.21% 36.08% 36.06% IMPUTABILIDAD % IMPUTABILIDAD
S1 TUB PIPING (m) m - - - - - - - -
2479.678575 SECTOR 4
20021.00 14536.00 - 961.00 685.11 910.00 20,021.00 7,327.00 8,376.00 6,147.00 100.00% 50.41% 41.84% 42.29% PROYECTO Prog Real ENP PAC PAC Acum SSEE NO SSEE SSEE NO SSEE
S1 EMM ESTRUCTURAS (kg) kg - - - - - - - -
3132.79842 SECTOR 5
28362.00 28362.00 - 2,896.00 1,778.77 1,805.00 28,362.00 9,615.00 5,239.00 7,148.00 100.00% 33.90% 18.47% 25.20% SEMANA 1 0 0 0 0 0 0.0% 0.0% 0 0 0% 0%
S1 EMD DESMONTAJE (kg) kg - - - - - - - -
DESMONTAJE
1689.00 1689.00 - 193.00 - 9.00 1,689.00 1,318.00 614.00 614.00 100.00% 78.03% 36.35% 36.35% SEMANA 2 0 0 0 0 0 0.0% 0.0% 0 0 0% 0% S2 SECTOR 2
SOLICITUDES DE CAMBIO
0.00 16039.00 - 96.00 - - - 13,232.00 - 10,993.00 0.00% 82.50% 0.00% 68.54% SEMANA 3 6 4 6 4 0 66.7% 66.7% 0 2 0% 100%
S2 EXC EXCAVACIÓN (m3) m3 - - - - - - - -
PRECOMISIONADO
770.00 770.00 - - - 770.00 - - - 100.00% 0.00% 0.00% 0.00% SEMANA 4 13 7 19 11 0 53.8% 57.9% 5 1 83% 17%
S2 CON CONCRETO (m3) m3 - - - - - - - -
COMISIONADO
770.00 770.00 192.00 - - 770.00 - - - 100.00% 0.00% 0.00% 0.00% SEMANA 5 14 8 33 19 0 57.1% 57.6% 4 2 67% 33%
S2 TUB PIPING (m) m - - - - - - - -
SEMANA 6 15 7 48 26 2 46.7% 54.2% 7 7 50% 50%
S2 EMM ESTRUCTURAS (kg) kg - - - - - - - -
SEMANA 7 20 17 68 43 0 85.0% 63.2% 2 4 33% 67%
S2 EMD DESMONTAJE (kg) kg - - - - - - - -
SEMANA 8 21 17 89 60 0 81.0% 67.4% 5 2 71% 29% S3 SECTOR 3
SEMANA 9 35 23 124 83 0 65.7% 66.9% 9 1 90% 10%
S3 EXC EXCAVACIÓN (m3) m3 - - - - - - - -
SEMANA 10 36 13 160 96 0 36.1% 60.0% 20 3 87% 13%
S3 CON CONCRETO (m3) m3 - - - - - - - -
SEMANA 11 28 23 188 119 0 82.1% 63.3% 5 0 100% 0%
S3 TUB PIPING (m) m - - - - - - - -
SEMANA 12 35 17 223 136 0 48.6% 61.0% 18 0 100% 0%
S3 EMM ESTRUCTURAS (kg) kg - - - - - - - -
SEMANA 13 50 21 273 157 0 42.0% 57.5% 29 25 54% 46%
S3 EMD DESMONTAJE (kg) kg - - - - - - - -
SEMANA 14 69 53 342 210 0 76.8% 61.4% 15 1 94% 6% S4 SECTOR 4
SEMANA 15 55 41 397 251 0 74.5% 63.2% 14 1 93% 7%
S4 EXC EXCAVACIÓN (m3) m3 - - - - - - - -
SEMANA 16 93 62 490 313 0 66.7% 63.9% 31 0 100% 0%
S4 CON CONCRETO (m3) m3 - - - - - - - -
SEMANA 17 65 25 555 338 7 38.5% 60.9% 40 0 100% 0%
S4 TUB PIPING (m) m - - - - - - - -
SEMANA 18 42 19 597 357 11 45.2% 59.8% 23 0 100% 0%
S4 EMM ESTRUCTURAS (kg) kg - - - - - - - -
SEMANA 19 57 31 654 388 0 54.4% 59.3% 25 1 96% 4%
S4 EMD DESMONTAJE (kg) kg - - - - - - - -
SEMANA 20 88 44 742 432 0 50.0% 58.2% 44 3 94% 6% S5 SECTOR 5
SEMANA 21 42 28 784 460 0 66.7% 58.7% 14 2 88% 13%
S5 EXC EXCAVACIÓN (m3) m3 - - - - - - - -
SEMANA 22 84 52 868 512 0 61.9% 59.0% 23 9 72% 28%
S5 CON CONCRETO (m3) m3 - - - - - - - -
SEMANA 23 108 57 976 569 0 52.8% 58.3% 50 3 94% 6%
S5 TUB PIPING (m) m - - - - - - - -
SEMANA 24 55 13 1,031 582 0 23.6% 56.5% 50 3 94% 6%
S5 EMM ESTRUCTURAS (kg) kg - - - - - - - -
SEMANA 25 139 97 1,170 679 0 69.8% 58.0% 41 1 98% 2%
S5 EMD DESMONTAJE (kg) kg - - - - - - - -
SEMANA 26 132 78 1,302 757 0 59.1% 58.1% 8 42 16% 84%
S5 MLL MALLA A TIERRA (m) m - - - - - - - -
SEMANA 27 158 115 1,460 872 1 72.8% 59.7% 17 26 40% 60% Resumen
SEMANA 28 189 154 1,649 1,026 2 81.5% 62.2% 10 25 29% 71% EXCAVACIÓN (m3) - - - - - - - -
SEMANA 29 189 154 1,838 1,180 3 81.5% 64.2% 10 25 29% 71% CONCRETO (m3) - - - - - - - -
SEMANA 30 189 154 2,027 1,334 4 81.5% 65.8% 10 25 29% 71% PIPING (m) - - - - - - - -
SEMANA 31 225 122 2,252 1,456 24 54.2% 64.7% 10 25 29% 71% ESTRUCTURAS (kg) - - - - - - - -
SEMANA 32 389 112 2,641 1,568 11 28.8% 59.4% 277 1 100% 0% DESMONTAJE (kg) - - - - - - - -
SEMANA 33 189 154 2,830 1,722 12 81.5% 60.8% 10 25 29% 71% MALLA A TIERRA (m) - - - - - - - -
Data
Sum - Sum - HH GANADAS
### ###
MUS
TOTAL Values Ends Blank Up Down
Periodo Acumulado Err:504 Err:504
34 0 Err:504 - -
35 0 Err:504 - -
36 0 Err:504 - -
Por ejecutar Err:504 Err:504 Err:504 Err:504
Excavación Total Err:504 Err:504
MUS
TOTAL Values Ends Blank Up Down
Periodo Acumulado Err:504 Err:504
34 0 Err:504 - -
35 0 Err:504 - -
36 0 Err:504 - -
Por ejecutar Err:504 Err:504 Err:504 Err:504
Montaje Total Err:504 Err:504
GANADO
LB0
GANADO
LC4
%REAL
LB
%REAL
LC4
Pro
Acum
Real
Acum
PAC
PROG
Pro
Acum
Real
Acum
Periodo
Acumulado
34 35 36 Por ejecutar Excavación
Total
-
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0 0 0
Excavación
m3
Periodo
Acumu...
34 35 36 Por
ejecutar
Concreto
Total
-
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
- - -
Concreto
m3
SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8 SEMANA 9 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 13 SEMANA 14 SEMANA 15 SEMANA 16 SEMANA 17 SEMANA 18 SEMANA 19 SEMANA 20 SEMANA 21
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
0.0% 0.0%
66.7%
53.8%
57.1%
46.7%
85.0%
81.0%
65.7%
36.1%
82.1%
48.6%
42.0%
76.8%
74.5%
66.7%
38.5%
45.2%
54.4%
50.0%
66.7%
0.0% 0.0%
66.7%
57.9% 57.6%
54.2%
63.2%
67.4% 66.9%
60.0%
63.3%
61.0%
57.5%
61.4%
63.2% 63.9%
60.9% 59.8% 59.3% 58.2% 58.7%
PAC vs PAC Acum
PAC PAC Acum
Periodo
Acumulado
34 35 36 Por ejecutar Montaje Total
-
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0 0 0
ESTRUCTURAS METÁLICAS MONTAJE
Kg
-
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
- - -
ESTRUCTURAS
METÁLICAS
DESMONTAJE
Kg
COMPAÑÍA MINERA ANTAMINA S.A
INGENIERIA Y PROYECTOS
8WEEK LOOK AHEAD
hh ev
66,801.00DD 12/17/2021 34
17-Dec 39 40 41 42 43 44 45 1.42% 3.64% 5.51% 10.54% 10.15% 7.89% 6.01% 3.65% 1.38% 1.10%
1 2 3 4 5 13 14 19 25 26 30 31 32 33 34 35 36 37 38 34 35 36 37 38 39 40 41 42 43
SECTOR MOD UNID. % AVANCE
INCIDEN
INICIO FCST FIN FCST Suma 8W REVISAR PAC DESGLOCE Semana 34
Metrado
HH
%PV
Semana 35
Metrado
HH
%PV
Semana 36
Metrado
HH
%PV
Semana 37
Metrado
HH
%PV
Semana 38
Metrado
HH
%PV
Semana 39
Metrado
HH
%PV
Semana 40
Metrado
HH
%PV
Semana 41
Metrado
HH
%PV
Semana 42
Metrado
HH
%PV
Semana 43
Metrado
HH
%PV
# AU SECTOR MOD UNID. % AVANCE INCIDEN INICIO FCST FIN FCST Suma 8W REVISAR PAC DESGLOCE V S D L M M JQty. SS 34
HH Semana 340 V S D L M M JQty. SS 35
HH Semana 350 V S D L M M JQty. SS 36
HH Semana 36 0 V S D L M M J Qty. SS 37
HH Semana 37 0 V S D L M M JQty. SS 38
HH Semana 380 V S D L M M JQty. SS 39
HH Semana 390 V S D L M M JQty. SS 40
HH Semana 400 V S D L M M JQty. SS 41
HH Semana 410 V S D L M M JQty. SS 42
HH Semana 42
0 V S D L M M JQty. SS 43
HH Semana 43 0
3 01 CONSTRUCCIÓN X X V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J
4 01.01 GE PRO CASETA P/ OFICINA, GUARDIANIA Y DEPOSITO GLB 100.00% 0.00 0.00 X X 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
5 01.02 GE PRO ENERGIA ELECTRICA PARA INSTALACIONES DEL CONTRATISTA GLB 100.00% 0.00 0.00 X X 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
6 01.03 GE PRO LIMPIEZA PERMANENTE DE OBRA GLB 100.00% 0.00 0.00 X X 0 0 0 0 0 ### 0 0 ### 0 0 ### 0 0 ### 0 0 ### 0 0 ### 0 0 ### 0 0 ### 0 - #DIV/0!
7 02 OBRAS PRELIMINARES 0 X X 0 0 ### 0 0 ### 0 0 ### 0 0 ### 0 0 ### 0 0 ### 0 0 ### 0 0 ### 0 - #DIV/0!
8 02.01 GE PRE SEÑALIZACION DE LA ZONA DE TRABAJO GLB 100.00% 0.00 0.00 X X 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
9 02.02 GE PRE MOVILIZACION Y DESMOVILIZACION GLB 100.00% 0.00 0.00 X X 0 0 0 0 0 ### 0 0 ### 0 0 ### 0 0 ### 0 0 ### 0 0 ### 0 0 ### 0 0 ### 0 - #DIV/0!
10 02.03 GE PRE TRAZO Y REPLANTEO GLB 100.00% 0.00 0.00 X X 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.1 03 S5 RED DE DRENAJE SUPERFICIAL CANAL TRAMO 1 MOD L, I, K1 0.28 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.2 03.01 S5 RDS DISCIPLINA: CIVIL 0.28 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.3 03.01.01 S5 RDS MOVIMIENTO DE TIERRAS PARA TUBERÍAS, CANALES Y BUZONES - RED DE DRENAJE SUPERFIC 0.28 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.4 03.01.01.01 S5 RDS EXCAVACION CON EQUIPO m3 0.00% 0.28 87.64 31/12/2021 06/01/2022 7.00 7.00 12.52 87.64 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 12.52 12.52 12.52 12.52 12.52 12.52 12.52 87.6 133.651 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.5 03.01.01.02 S5 RDS REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.00% 0.28 351.96 31/12/2021 06/01/2022 7.00 7.00 50.28 351.96 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 50.28 50.28 50.28 50.28 50.28 50.28 50.28 352 44.8749 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.6 03.01.01.03 S5 RDS TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM<=1 m3 -KM 0.00% 0.28 5.88 31/12/2021 06/01/2022 7.00 7.00 0.84 5.88 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.84 0.84 0.84 0.84 0.84 0.84 0.84 5.88 0.9114 0.91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.7 03.01.01.04 S5 RDS TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM>1 KM (
m3 -KM 0.00% 0.28 33.04 31/12/2021 06/01/2022 7.00 7.00 4.72 33.04 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 4.72 4.72 4.72 4.72 4.72 4.72 4.72 33 1.2114667 1.21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.8 03.01.01.05 S5 RDS COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 0.00% 0.28 4.48 31/12/2021 06/01/2022 7.00 7.00 0.64 4.48 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.64 0.64 0.64 0.64 0.64 0.64 0.64 4.48 15.306667 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.9 03.01.01.06 S5 RDS TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 0.00% 0.28 17.36 07/01/2022 13/01/2022 7.00 7.00 2.48 17.36 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.48 2.48 2.48 2.48 2.48 2.48 2.48 17.36 2.6908 0.9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.10 03.01.01.07 S5 RDS TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KMm3 -KM 0.00% 0.28 100.80 07/01/2022 13/01/2022 7.00 7.00 14.40 100.80 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14.4 14.4 14.4 14.4 14.4 14.4 14.4 100.8 3.696 0.92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.11 03.01.01.08 S5 RDS RELLENO CON MATERIAL 2B DE PRESTAMO m3 0.00% 0.28 13.16 07/01/2022 13/01/2022 7.00 7.00 1.88 13.16 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.88 1.88 1.88 1.88 1.88 1.88 1.88 13.16 23.359 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.12 03.01.01.09 S5 RDS RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 0.00% 0.28 5.04 07/01/2022 13/01/2022 7.00 7.00 0.72 5.04 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.72 0.72 0.72 0.72 0.72 0.72 0.72 5.04 10.206 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.13 03.01.01.10 S5 RDS ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.00% 0.28 22.40 31/12/2021 06/01/2022 7.00 7.00 3.20 22.40 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 3.2 3.2 3.2 3.2 3.2 3.2 3.2 22.4 2.57152 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.14 03.01.01.11 S5 RDS ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.00% 0.28 63.84 31/12/2021 06/01/2022 7.00 7.00 9.12 63.84 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 9.12 9.12 9.12 9.12 9.12 9.12 9.12 63.8 2.981328 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.15 03.01.01.12 S5 RDS APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.00% 0.28 11.20 31/12/2021 06/01/2022 7.00 7.00 1.60 11.20 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 1.6 1.6 1.6 1.6 1.6 1.6 1.6 11.2 2.630303 0.88 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.16 04.01.01.03 S5 RDS CONCRETO ARMADO 0.28 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.17 03.01.02.01 S5 RDS COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 0.00% 0.28 5.60 05/01/2022 11/01/2022 7.00 7.00 0.80 5.60 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.8 0.8 1.6 9.8824 0.28 0.8 0.8 0.8 0.8 0.8 0 0 4 24.706 0.71 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.18 23.02.01.03 S5 RDS 0.28 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.19 03.01.03.01 S5 RDS COLOCACIÓN DE CONCRETO F'c=20 MPa m3 0.00% 0.28 33.88 10/01/2022 16/01/2022 7.00 7.00 4.84 33.88 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.84 4.84 4.84 4.84 19.36 119.576471 0.57 4.84 4.84 4.84 0 0 0 0 14.5 89.68235 0.43 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.20 03.01.03.02 S5 RDS ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 0.28 116.76 06/01/2022 12/01/2022 7.00 7.00 16.68 116.76 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16.68 16.7 41.209608 0.14 16.68 16.68 16.68 16.68 16.68 16.68 0 100.08 247.257648 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.21 03.01.03.03 S5 RDS SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f` kg 0.00% 0.28 2,212.00 07/01/2022 13/01/2022 7.00 7.00 316.00 2212.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 316 316 316 316 316 316 316 2212 258.066667 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.22 03.01.04 S5 RDS CURADO DE CONCRETO CON ADITIVO 0.28 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.23 03.01.04.01 S5 RDS CURADO DE CONCRETO CON ANTISOL m2 0.00% 0.28 224.00 14/01/2022 20/01/2022 7.00 7.00 32.00 224.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 32 32 32 32 32 32 32 224 30.8 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.24 03.01.05 S5 RDS CARPINTERIA METALICA 0.28 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.25 03.01.05.01 S5 RDS SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.575m m 50.74% 0.28 67.59 15/01/2022 21/01/2022 7.00 7.00 9.66 67.59 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9.6557 9.6557 9.6557 9.6557 9.6557 9.6557 57.9 212.7833 0.42 9.6557 0 0 0 0 0 0 9.66 35.46389 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.26 03.01.05.02 S5 RDS SUMINISTRO E INSTALACIÓN DE GRATING TMyP 3"x1/4"x1.30m m 54.90% 0.28 0.76 15/01/2022 21/01/2022 7.00 7.00 0.11 0.76 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1086 0.1086 0.1086 0.1086 0.1086 0.1086 0.65 8.866667 0.39 0.1086 0 0 0 0 0 0 0.11 1.477778 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.27 03.01.05.03 S5 RDS SUMINISTRO E INSTALACIÓN DE GRATING TMyP 3"x1/4"x2.10m m 55.50% 0.28 0.50 15/01/2022 21/01/2022 7.00 7.00 0.07 0.50 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0714 0.0714 0.0714 0.0714 0.0714 0.0714 0.43 7.777778 0.39 0.0714 0 0 0 0 0 0 0.07 1.296296 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.28 3.02S5 RDS DISCIPLINA: INSTALACIONES SANITARIAS 0.28 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.29 03.02.01 S5 RDS RED DE DRENAJE SUPERFICIAL - DRENAJE DE PUNTO DE AGUA Ø 2" 0.28 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.30 03.02.01.01 S5 RDS PIPE, PVC-D3034, BELL, SDR 35 Ø2" m 0.00% 0.28 0.56 07/01/2022 13/01/2022 7.00 7.00 0.08 0.56 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.56 1.4 1.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.31 03.02.01.02 S5 RDS EL, 90DEG, BELL. BELL, PVC-D3034 Ø2" und 0.00% 0.28 0.28 07/01/2022 13/01/2022 7.00 7.00 0.04 0.28 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.28 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.32 03.02.02 S5 RDS RED DE DRENAJE SUPERFICIAL-MONTANTE A CAJA DE REGISTRO DE DESGÜE Ø4" 0.28 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.33 03.02.02.01 S5 RDS PIPE, PVC-D3034, BELL, SDR 35 Ø4" m 0.00% 0.28 35.84 07/01/2022 13/01/2022 7.00 7.00 5.12 35.84 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.12 5.12 5.12 5.12 5.12 5.12 5.12 35.84 54.32 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.34 03.02.02.02 S5 RDS EL, 90DEG, BELL. BELL, PVC-D3034 Ø4" und 0.00% 0.28 7.28 07/01/2022 13/01/2022 7.00 7.00 1.04 7.28 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1.04 1.04 1.04 1.04 1.04 1.04 1.04 7.28 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.35 03.02.03 S5 RDS RED DE DRENAJE SUPERFICIAL-ENTRE CAJAS DE REGISTRO DE DESGÜE Ø6" 0.28 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.36 03.02.03.01 S5 RDS Pipe, PE D3350, PE, SDR 21 ø6" m 0.00% 0.28 1.40 07/01/2022 13/01/2022 7.00 7.00 0.20 1.40 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2 0.2 0.2 0.2 0.2 0.2 0.2 1.4 2.8 0.93 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.37 03 S5 RED DE DRENAJE SUPERFICIAL CANAL TRAMO 2 MOD B, D, E 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.38 03.01 S5 RDS DISCIPLINA: CIVIL 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.39 03.01.01 S5 RDS MOVIMIENTO DE TIERRAS PARA TUBERÍAS, CANALES Y BUZONES - RED DE DRENAJE SUPERFIC 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.40 03.01.01.01 S5 RDS EXCAVACION CON EQUIPO m3 0.00% 0.23 71.99 07/01/2022 13/01/2022 7.00 7.00 10.28 71.99 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10.284 10.284 10.284 10.284 10.284 10.284 10.284 71.99 109.78475 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.41 03.01.01.02 S5 RDS REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.00% 0.23 289.11 07/01/2022 13/01/2022 7.00 7.00 41.30 289.11 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 41.301 41.301 41.301 41.301 41.301 41.301 41.301 289.11 36.861525 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.42 03.01.01.03 S5 RDS TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM<=1 m3 -KM 0.00% 0.23 4.83 07/01/2022 13/01/2022 7.00 7.00 0.69 4.83 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.69 0.69 0.69 0.69 0.69 0.69 0.69 4.83 0.74865 0.75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.43 03.01.01.04 S5 RDS TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM>1 KM (
m3 -KM 0.00% 0.23 27.14 07/01/2022 13/01/2022 7.00 7.00 3.88 27.14 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.8771 3.8771 3.8771 3.8771 3.8771 3.8771 3.8771 27.14 0.99513333 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.44 03.01.01.05 S5 RDS COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 0.00% 0.23 3.68 07/01/2022 13/01/2022 7.00 7.00 0.53 3.68 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5257 0.5257 0.5257 0.5257 0.5257 0.5257 0.5257 3.68 12.5733333 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.45 03.01.01.06 S5 RDS TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 0.00% 0.23 14.26 14/01/2022 20/01/2022 7.00 7.00 2.04 14.26 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.0371 2.0371 2.0371 2.0371 2.0371 2.0371 2.0371 14.3 2.2103 1.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.46 03.01.01.07 S5 RDS TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KMm3 -KM 0.00% 0.23 82.80 14/01/2022 20/01/2022 7.00 7.00 11.83 82.80 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11.829 11.829 11.829 11.829 11.829 11.829 11.829 82.8 3.036 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.47 03.01.01.08 S5 RDS RELLENO CON MATERIAL 2B DE PRESTAMO m3 0.00% 0.23 10.81 14/01/2022 20/01/2022 7.00 7.00 1.54 10.81 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.5443 1.5443 1.5443 1.5443 1.5443 1.5443 1.5443 10.8 19.18775 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.48 03.01.01.09 S5 RDS RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 0.00% 0.23 4.14 14/01/2022 20/01/2022 7.00 7.00 0.59 4.14 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5914 0.5914 0.5914 0.5914 0.5914 0.5914 0.5914 4.14 8.3835 1.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.49 03.01.01.10 S5 RDS ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.00% 0.23 18.40 07/01/2022 13/01/2022 7.00 7.00 2.63 18.40 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.6286 2.6286 2.6286 2.6286 2.6286 2.6286 2.6286 18.4 2.11232 1.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.50 03.01.01.11 S5 RDS ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.00% 0.23 52.44 07/01/2022 13/01/2022 7.00 7.00 7.49 52.44 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.4914 7.4914 7.4914 7.4914 7.4914 7.4914 7.4914 52.44 2.448948 1.22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.51 03.01.01.12 S5 RDS APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.00% 0.23 9.20 07/01/2022 13/01/2022 7.00 7.00 1.31 9.20 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.3143 1.3143 1.3143 1.3143 1.3143 1.3143 1.3143 9.2 2.16060606 1.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.52 04.01.01.03 S5 RDS CONCRETO ARMADO 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.53 03.01.02.01 S5 RDS COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 0.00% 0.23 4.60 14/01/2022 20/01/2022 7.00 7.00 0.66 4.60 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.6571 0.6571 0.6571 0.6571 0.6571 0.6571 0.6571 4.6 28.4119 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.54 23.02.01.03 S5 RDS 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.55 03.01.03.01 S5 RDS COLOCACIÓN DE CONCRETO F'c=20 MPa m3 0.00% 0.23 27.83 19/01/2022 25/01/2022 7.00 7.00 3.98 27.83 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.9757 3.9757 7.95 49.11176 0.29 3.9757 3.9757 3.9757 3.9757 3.9757 0 0 19.9 122.7794 0.71 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.56 03.01.03.02 S5 RDS ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 0.23 95.91 15/01/2022 21/01/2022 7.00 7.00 13.70 95.91 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13.701 13.701 13.701 13.701 13.701 13.701 82.2 203.1045 0.86 13.701 0 0 0 0 0 0 13.7 33.85075 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.57 03.01.03.03 S5 RDS SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f` kg 0.00% 0.23 1,817.00 16/01/2022 22/01/2022 7.00 7.00 259.57 1817.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 259.57 259.57 259.57 259.57 259.57 1298 151.4167 0.71 259.57 259.57 0 0 0 0 0 519 60.56667 0.29 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.58 03.01.04 S5 RDS CURADO DE CONCRETO CON ADITIVO 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.59 03.01.04.01 S5 RDS CURADO DE CONCRETO CON ANTISOL m2 0.00% 0.23 184.00 23/01/2022 29/01/2022 7.00 7.00 26.29 184.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 26.286 26.286 26.286 26.286 26.286 131 18.07143 0.72 26.286 26.286 0 0 0 0 0 52.6 7.2285714 0.29 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.60 03.01.05 S5 RDS CARPINTERIA METALICA 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.61 03.01.05.01 S5 RDS SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.575m m 50.74% 0.23 55.52 24/01/2022 26/01/2022 3.00 3.00 18.51 55.52 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18.507 18.507 18.507 0 55.5 203.916 0.49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.62 03.01.05.02 S5 RDS SUMINISTRO E INSTALACIÓN DE GRATING TMyP 3"x1/4"x1.30m m 54.90% 0.23 0.62 24/01/2022 26/01/2022 3.00 3.00 0.21 0.62 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2067 0.2067 0.2067 0 0.62 8.438889 0.44 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.63 03.01.05.03 S5 RDS SUMINISTRO E INSTALACIÓN DE GRATING TMyP 3"x1/4"x2.10m m 55.50% 0.23 0.41 24/01/2022 26/01/2022 3.00 3.00 0.14 0.41 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1367 0.1367 0.1367 0 0.41 7.440741 0.44 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.64 3.02S5 RDS DISCIPLINA: INSTALACIONES SANITARIAS 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.65 03.02.01 S5 RDS RED DE DRENAJE SUPERFICIAL - DRENAJE DE PUNTO DE AGUA Ø 2" 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.66 03.02.01.01 S5 RDS PIPE, PVC-D3034, BELL, SDR 35 Ø2" m 0.00% 0.23 0.46 14/01/2022 20/01/2022 7.00 7.00 0.07 0.46 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0657 0.0657 0.0657 0.0657 0.0657 0.0657 0.0657 0.46 1.15 1.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.67 03.02.01.02 S5 RDS EL, 90DEG, BELL. BELL, PVC-D3034 Ø2" und 0.00% 0.23 0.23 14/01/2022 20/01/2022 7.00 7.00 0.03 0.23 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0.0329 0.0329 0.0329 0.0329 0.0329 0.0329 0.0329 0.23 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.68 03.02.02 S5 RDS RED DE DRENAJE SUPERFICIAL-MONTANTE A CAJA DE REGISTRO DE DESGÜE Ø4" 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.69 03.02.02.01 S5 RDS PIPE, PVC-D3034, BELL, SDR 35 Ø4" m 0.00% 0.23 29.44 14/01/2022 20/01/2022 7.00 7.00 4.21 29.44 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.2057 4.2057 4.2057 4.2057 4.2057 4.2057 4.2057 29.4 44.62 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.70 03.02.02.02 S5 RDS EL, 90DEG, BELL. BELL, PVC-D3034 Ø4" und 0.00% 0.23 5.98 14/01/2022 20/01/2022 7.00 7.00 0.85 5.98 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0.8543 0.8543 0.8543 0.8543 0.8543 0.8543 0.8543 5.98 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.71 03.02.03 S5 RDS RED DE DRENAJE SUPERFICIAL-ENTRE CAJAS DE REGISTRO DE DESGÜE Ø6" 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.72 03.02.03.01 S5 RDS Pipe, PE D3350, PE, SDR 21 ø6" m 0.00% 0.23 1.15 14/01/2022 20/01/2022 7.00 7.00 0.16 1.15 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1643 0.1643 0.1643 0.1643 0.1643 0.1643 0.1643 1.15 2.3 1.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.73 03 S5 RED DE DRENAJE SUPERFICIAL CANAL TRAMO 3 MOD A, T 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.74 03.01 S5 RDS DISCIPLINA: CIVIL 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.75 03.01.01 S5 RDS MOVIMIENTO DE TIERRAS PARA TUBERÍAS, CANALES Y BUZONES - RED DE DRENAJE SUPERFIC 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.76 03.01.01.01 S5 RDS EXCAVACION CON EQUIPO m3 0.00% 0.23 71.99 07/01/2022 20/01/2022 14.00 14.00 5.14 71.99 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.1421 5.1421 5.1421 5.1421 5.1421 5.1421 5.1421 35.995 54.892375 0.5 5.1421 5.1421 5.1421 5.1421 5.1421 5.1421 5.1421 36 54.89238 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.77 03.01.01.02 S5 RDS REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.00% 0.23 289.11 07/01/2022 20/01/2022 14.00 14.00 20.65 289.11 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20.651 20.651 20.651 20.651 20.651 20.651 20.651 144.56 18.4307625 0.5 20.651 20.651 20.651 20.651 20.651 20.651 20.651 145 18.43076 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.78 03.01.01.03 S5 RDS TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM<=1 m3 -KM 0.00% 0.23 4.83 07/01/2022 20/01/2022 14.00 14.00 0.35 4.83 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.345 0.345 0.345 0.345 0.345 0.345 0.345 2.415 0.374325 0.37 0.345 0.345 0.345 0.345 0.345 0.345 0.345 2.42 0.374325 0.37 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.79 03.01.01.04 S5 RDS TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM>1 KM (
m3 -KM 0.00% 0.23 27.14 07/01/2022 20/01/2022 14.00 14.00 1.94 27.14 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.9386 1.9386 1.9386 1.9386 1.9386 1.9386 1.9386 13.57 0.49756667 0.5 1.9386 1.9386 1.9386 1.9386 1.9386 1.9386 1.9386 13.6 0.497567 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.80 03.01.01.05 S5 RDS COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 0.00% 0.23 3.68 07/01/2022 20/01/2022 14.00 14.00 0.26 3.68 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2629 0.2629 0.2629 0.2629 0.2629 0.2629 0.2629 1.84 6.28666667 0.48 0.2629 0.2629 0.2629 0.2629 0.2629 0.2629 0.2629 1.84 6.286667 0.48 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.81 03.01.01.06 S5 RDS TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 0.00% 0.23 14.26 21/01/2022 03/02/2022 14.00 14.00 1.02 14.26 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.0186 1.0186 1.0186 1.0186 1.0186 1.0186 1.0186 7.13 1.10515 0.55 1.0186 1.0186 1.0186 1.0186 1.0186 1.0186 1.0186 7.13 1.10515 0.55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.82 03.01.01.07 S5 RDS TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KMm3 -KM 0.00% 0.23 82.80 21/01/2022 03/02/2022 14.00 14.00 5.91 82.80 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.9143 5.9143 5.9143 5.9143 5.9143 5.9143 5.9143 41.4 1.518 0.51 5.9143 5.9143 5.9143 5.9143 5.9143 5.9143 5.9143 41.4 1.518 0.51 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.83 03.01.01.08 S5 RDS RELLENO CON MATERIAL 2B DE PRESTAMO m3 0.00% 0.23 10.81 29/01/2022 11/02/2022 14.00 14.00 0.77 10.81 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7721 0.7721 0.7721 0.7721 0.7721 0.7721 4.63 8.2233214 0.43 0.7721 0.7721 0.7721 0.7721 0.7721 0.7721 0.7721 5.419.593875 0.5 0.7721 0 0 0 0 0 0 0.77 1.37055 0.07 0 0 0 0 0 0 0 0 - 0
46.84 03.01.01.09 S5 RDS RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 0.00% 0.23 4.14 29/01/2022 11/02/2022 14.00 14.00 0.30 4.14 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2957 0.2957 0.2957 0.2957 0.2957 0.2957 1.77 3.5929286 0.45 0.2957 0.2957 0.2957 0.2957 0.2957 0.2957 0.2957 2.07 4.19175 0.52 0.2957 0 0 0 0 0 0 0.3 0.59882 0.07 0 0 0 0 0 0 0 0 - 0
46.85 03.01.01.10 S5 RDS ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.00% 0.23 18.40 07/01/2022 20/01/2022 14.00 14.00 1.31 18.40 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.3143 1.3143 1.3143 1.3143 1.3143 1.3143 1.3143 9.2 1.05616 0.53 1.3143 1.3143 1.3143 1.3143 1.3143 1.3143 1.3143 9.2 1.05616 0.53 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.86 03.01.01.11 S5 RDS ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.00% 0.23 52.44 07/01/2022 20/01/2022 14.00 14.00 3.75 52.44 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.7457 3.7457 3.7457 3.7457 3.7457 3.7457 3.7457 26.22 1.224474 0.61 3.7457 3.7457 3.7457 3.7457 3.7457 3.7457 3.7457 26.2 1.224474 0.61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.87 03.01.01.12 S5 RDS APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.00% 0.23 9.20 07/01/2022 20/01/2022 14.00 14.00 0.66 9.20 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.6571 0.6571 0.6571 0.6571 0.6571 0.6571 0.6571 4.6 1.08030303 0.54 0.6571 0.6571 0.6571 0.6571 0.6571 0.6571 0.6571 4.6 1.080303 0.54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.88 04.01.01.03 S5 RDS CONCRETO ARMADO 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.89 03.01.02.01 S5 RDS COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 0.00% 0.23 4.60 14/01/2022 27/01/2022 14.00 14.00 0.33 4.60 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3286 0.3286 0.3286 0.3286 0.3286 0.3286 0.3286 2.3 14.20595 0.51 0.3286 0.3286 0.3286 0.3286 0.3286 0.3286 0.3286 2.3 14.20595 0.51 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.90 23.02.01.03 S5 RDS 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.91 03.01.03.01 S5 RDS COLOCACIÓN DE CONCRETO F'c=20 MPa m3 0.00% 0.23 27.83 19/01/2022 01/02/2022 14.00 14.00 1.99 27.83 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.9879 1.9879 3.98 24.55588 0.14 1.9879 1.9879 1.9879 1.9879 1.9879 1.9879 1.9879 13.9 85.94559 0.5 1.9879 1.9879 1.9879 1.9879 1.9879 0 0 9.94 61.389706 0.36 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.92 03.01.03.02 S5 RDS ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 0.23 95.91 15/01/2022 28/01/2022 14.00 14.00 6.85 95.91 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.8507 6.8507 6.8507 6.8507 6.8507 6.8507 41.1 101.5522 0.43 6.8507 6.8507 6.8507 6.8507 6.8507 6.8507 6.8507 48 118.4776 0.5 6.8507 0 0 0 0 0 0 6.85 16.925375 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.93 03.01.03.03 S5 RDS SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f` kg 0.00% 0.23 1,817.00 16/01/2022 29/01/2022 14.00 14.00 129.79 1817.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 129.79 129.79 129.79 129.79 129.79 649 75.70833 0.36 129.79 129.79 129.79 129.79 129.79 129.79 129.79 909 105.9917 0.5 129.79 129.79 0 0 0 0 0 260 30.283333 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.94 03.01.04 S5 RDS CURADO DE CONCRETO CON ADITIVO 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.95 03.01.04.01 S5 RDS CURADO DE CONCRETO CON ANTISOL m2 0.00% 0.23 184.00 23/01/2022 05/02/2022 14.00 14.00 13.14 184.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13.143 13.143 13.143 13.143 13.143 65.7 9.035714 0.36 13.143 13.143 13.143 13.143 13.143 13.143 13.143 92 12.65 0.51 13.143 13.143 0 0 0 0 0 26.33.614286 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.96 03.01.05 S5 RDS CARPINTERIA METALICA 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.97 03.01.05.01 S5 RDS SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.575m m 50.74% 0.23 55.52 24/01/2022 30/01/2022 7.00 7.00 7.93 55.52 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.9314 7.9314 7.9314 7.9314 31.7 116.5235 0.28 7.9314 7.9314 7.9314 0 0 0 0 23.8 87.392593 0.21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.98 03.01.05.02 S5 RDS SUMINISTRO E INSTALACIÓN DE GRATING TMyP 3"x1/4"x1.30m m 54.90% 0.23 0.62 24/01/2022 30/01/2022 7.00 7.00 0.09 0.62 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0886 0.0886 0.0886 0.0886 0.35 4.822222 0.25 0.0886 0.0886 0.0886 0 0 0 0 0.27 3.6166667 0.19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.99 03.01.05.03 S5 RDS SUMINISTRO E INSTALACIÓN DE GRATING TMyP 3"x1/4"x2.10m m 55.50% 0.23 0.41 24/01/2022 30/01/2022 7.00 7.00 0.06 0.41 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0586 0.0586 0.0586 0.0586 0.23 4.251852 0.25 0.0586 0.0586 0.0586 0 0 0 0 0.18 3.1888889 0.19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.100 3.02S5 RDS DISCIPLINA: INSTALACIONES SANITARIAS 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.101 03.02.01 S5 RDS RED DE DRENAJE SUPERFICIAL - DRENAJE DE PUNTO DE AGUA Ø 2" 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.102 03.02.01.01 S5 RDS PIPE, PVC-D3034, BELL, SDR 35 Ø2" m 0.00% 0.23 0.46 07/01/2022 13/01/2022 7.00 7.00 0.07 0.46 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0657 0.0657 0.0657 0.0657 0.0657 0.0657 0.0657 0.46 1.15 1.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.103 03.02.01.02 S5 RDS EL, 90DEG, BELL. BELL, PVC-D3034 Ø2" und 0.00% 0.23 0.23 07/01/2022 13/01/2022 7.00 7.00 0.03 0.23 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0.0329 0.0329 0.0329 0.0329 0.0329 0.0329 0.0329 0.23 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.104 03.02.02 S5 RDS RED DE DRENAJE SUPERFICIAL-MONTANTE A CAJA DE REGISTRO DE DESGÜE Ø4" 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.105 03.02.02.01 S5 RDS PIPE, PVC-D3034, BELL, SDR 35 Ø4" m 0.00% 0.23 29.44 07/01/2022 13/01/2022 7.00 7.00 4.21 29.44 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.2057 4.2057 4.2057 4.2057 4.2057 4.2057 4.2057 29.44 44.62 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.106 03.02.02.02 S5 RDS EL, 90DEG, BELL. BELL, PVC-D3034 Ø4" und 0.00% 0.23 5.98 07/01/2022 13/01/2022 7.00 7.00 0.85 5.98 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0.8543 0.8543 0.8543 0.8543 0.8543 0.8543 0.8543 5.98 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.107 03.02.03 S5 RDS RED DE DRENAJE SUPERFICIAL-ENTRE CAJAS DE REGISTRO DE DESGÜE Ø6" 0.23 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.108 03.02.03.01 S5 RDS Pipe, PE D3350, PE, SDR 21 ø6" m 0.00% 0.23 1.15 07/01/2022 13/01/2022 7.00 7.00 0.16 1.15 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1643 0.1643 0.1643 0.1643 0.1643 0.1643 0.1643 1.15 2.3 1.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.109 03 S5 RED DE DRENAJE SUPERFICIAL CANAL TRAMO 4 MOD OyP, R, S 0.26 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.110 03.01 S5 RDS DISCIPLINA: CIVIL 0.26 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.111 03.01.01 S5 RDS MOVIMIENTO DE TIERRAS PARA TUBERÍAS, CANALES Y BUZONES - RED DE DRENAJE SUPERFIC 0.26 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.112 03.01.01.01 S5 RDS EXCAVACION CON EQUIPO m3 0.00% 0.26 81.38 07/01/2022 20/01/2022 14.00 14.00 5.81 81.38 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.8129 5.8129 5.8129 5.8129 5.8129 5.8129 5.8129 40.69 62.05225 0.5 5.8129 5.8129 5.8129 5.8129 5.8129 5.8129 5.8129 40.7 62.05225 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.113 03.01.01.02 S5 RDS REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.00% 0.26 326.82 07/01/2022 20/01/2022 14.00 14.00 23.34 326.82 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23.344 23.344 23.344 23.344 23.344 23.344 23.344 163.41 20.834775 0.5 23.344 23.344 23.344 23.344 23.344 23.344 23.344 163 20.83478 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.114 03.01.01.03 S5 RDS TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM<=1 m3 -KM 0.00% 0.26 5.46 07/01/2022 20/01/2022 14.00 14.00 0.39 5.46 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.39 0.39 0.39 0.39 0.39 0.39 0.39 2.73 0.42315 0.42 0.39 0.39 0.39 0.39 0.39 0.39 0.39 2.73 0.42315 0.42 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.115 03.01.01.04 S5 RDS TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM>1 KM (
m3 -KM 0.00% 0.26 30.68 07/01/2022 20/01/2022 14.00 14.00 2.19 30.68 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.1914 2.1914 2.1914 2.1914 2.1914 2.1914 2.1914 15.34 0.56246667 0.56 2.1914 2.1914 2.1914 2.1914 2.1914 2.1914 2.1914 15.3 0.562467 0.56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.116 03.01.01.05 S5 RDS COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 0.00% 0.26 4.16 07/01/2022 20/01/2022 14.00 14.00 0.30 4.16 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2971 0.2971 0.2971 0.2971 0.2971 0.2971 0.2971 2.08 7.10666667 0.51 0.2971 0.2971 0.2971 0.2971 0.2971 0.2971 0.2971 2.08 7.106667 0.51 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.117 03.01.01.06 S5 RDS TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 0.00% 0.26 16.12 21/01/2022 03/02/2022 14.00 14.00 1.15 16.12 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.1514 1.1514 1.1514 1.1514 1.1514 1.1514 1.1514 8.06 1.2493 0.62 1.1514 1.1514 1.1514 1.1514 1.1514 1.1514 1.1514 8.06 1.2493 0.62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.118 03.01.01.07 S5 RDS TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KMm3 -KM 0.00% 0.26 93.60 21/01/2022 03/02/2022 14.00 14.00 6.69 93.60 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.6857 6.6857 6.6857 6.6857 6.6857 6.6857 6.6857 46.8 1.716 0.57 6.6857 6.6857 6.6857 6.6857 6.6857 6.6857 6.6857 46.8 1.716 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.119 03.01.01.08 S5 RDS RELLENO CON MATERIAL 2B DE PRESTAMO m3 0.00% 0.26 12.22 21/01/2022 03/02/2022 14.00 14.00 0.87 12.22 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.8729 0.8729 0.8729 0.8729 0.8729 0.8729 0.8729 6.11 10.84525 0.49 0.8729 0.8729 0.8729 0.8729 0.8729 0.8729 0.8729 6.11 10.84525 0.49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.120 03.01.01.09 S5 RDS RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 0.00% 0.26 4.68 21/01/2022 03/02/2022 14.00 14.00 0.33 4.68 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3343 0.3343 0.3343 0.3343 0.3343 0.3343 0.3343 2.34 4.7385 0.53 0.3343 0.3343 0.3343 0.3343 0.3343 0.3343 0.3343 2.34 4.7385 0.53 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.121 03.01.01.10 S5 RDS ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.00% 0.26 20.80 07/01/2022 20/01/2022 14.00 14.00 1.49 20.80 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.4857 1.4857 1.4857 1.4857 1.4857 1.4857 1.4857 10.4 1.19392 0.6 1.4857 1.4857 1.4857 1.4857 1.4857 1.4857 1.4857 10.4 1.19392 0.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.122 03.01.01.11 S5 RDS ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.00% 0.26 59.28 07/01/2022 20/01/2022 14.00 14.00 4.23 59.28 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.2343 4.2343 4.2343 4.2343 4.2343 4.2343 4.2343 29.64 1.384188 0.46 4.2343 4.2343 4.2343 4.2343 4.2343 4.2343 4.2343 29.6 1.384188 0.46 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.123 03.01.01.12 S5 RDS APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.00% 0.26 10.40 07/01/2022 20/01/2022 14.00 14.00 0.74 10.40 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7429 0.7429 0.7429 0.7429 0.7429 0.7429 0.7429 5.2 1.22121212 0.61 0.7429 0.7429 0.7429 0.7429 0.7429 0.7429 0.7429 5.2 1.221212 0.61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.124 04.01.01.03 S5 RDS CONCRETO ARMADO 0.26 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.125 03.01.02.01 S5 RDS COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 0.00% 0.26 5.20 15/01/2022 21/01/2022 7.00 7.00 0.74 5.20 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7429 0.7429 0.7429 0.7429 0.7429 0.7429 4.46 27.52954 0.86 0.7429 0 0 0 0 0 0 0.74 4.588257 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.126 23.02.01.03 S5 RDS 0.26 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.127 03.01.03.01 S5 RDS COLOCACIÓN DE CONCRETO F'c=20 MPa m3 0.00% 0.26 31.46 20/01/2022 26/01/2022 7.00 7.00 4.49 31.46 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.4943 4.49 27.75882 0.14 4.4943 4.4943 4.4943 4.4943 4.4943 4.4943 0 27 166.5529 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.128 03.01.03.02 S5 RDS ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 0.26 108.42 16/01/2022 22/01/2022 7.00 7.00 15.49 108.42 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15.489 15.489 15.489 15.489 15.489 77.4 191.3303 0.71 15.489 15.489 0 0 0 0 0 31 76.53213 0.29 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.129 03.01.03.03 S5 RDS SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f` kg 0.00% 0.26 2,054.00 17/01/2022 23/01/2022 7.00 7.00 293.43 2054.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 293.43 293.43 293.43 293.43 1174 136.9333 0.57 293.43 293.43 293.43 0 0 0 0 880 102.7 0.43 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.130 03.01.04 S5 RDS CURADO DE CONCRETO CON ADITIVO 0.26 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.131 03.01.04.01 S5 RDS CURADO DE CONCRETO CON ANTISOL m2 0.00% 0.26 208.00 24/01/2022 30/01/2022 7.00 7.00 29.71 208.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 29.714 29.714 29.714 29.714 119 16.34286 0.56 29.714 29.714 29.714 0 0 0 0 89.1 12.257143 0.42 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.132 03.01.05 S5 RDS CARPINTERIA METALICA 0.26 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.133 03.01.05.01 S5 RDS SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.575m m 50.74% 0.26 62.76 25/01/2022 31/01/2022 7.00 7.00 8.97 62.76 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.9657 8.9657 8.9657 26.9 98.78889 0.21 8.9657 8.9657 8.9657 8.9657 0 0 0 35.9 131.71852 0.28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.134 03.01.05.02 S5 RDS SUMINISTRO E INSTALACIÓN DE GRATING TMyP 3"x1/4"x1.30m m 54.90% 0.26 0.70 25/01/2022 31/01/2022 7.00 7.00 0.10 0.70 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1 0.1 0.1 0.3 4.083333 0.19 0.1 0.1 0.1 0.1 0 0 0 0.4 5.4444444 0.26 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.135 03.01.05.03 S5 RDS SUMINISTRO E INSTALACIÓN DE GRATING TMyP 3"x1/4"x2.10m m 55.50% 0.26 0.46 25/01/2022 31/01/2022 7.00 7.00 0.07 0.46 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0657 0.0657 0.0657 0.2 3.577778 0.19 0.0657 0.0657 0.0657 0.0657 0 0 0 0.26 4.7703704 0.25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.136 3.02S5 RDS DISCIPLINA: INSTALACIONES SANITARIAS 0.26 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.137 03.02.01 S5 RDS RED DE DRENAJE SUPERFICIAL - DRENAJE DE PUNTO DE AGUA Ø 2" 0.26 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.138 03.02.01.01 S5 RDS PIPE, PVC-D3034, BELL, SDR 35 Ø2" m 0.00% 0.26 0.52 27/01/2022 02/02/2022 7.00 7.00 0.07 0.52 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0743 0.07 0.185714 0.19 0.0743 0.0743 0.0743 0.0743 0.0743 0.0743 0 0.45 1.1142857 1.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.139 03.02.01.02 S5 RDS EL, 90DEG, BELL. BELL, PVC-D3034 Ø2" und 0.00% 0.26 0.26 27/01/2022 02/02/2022 7.00 7.00 0.04 0.26 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0.0371 0.04 0 ### 0.0371 0.0371 0.0371 0.0371 0.0371 0.0371 0 0.22 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.140 03.02.02 S5 RDS RED DE DRENAJE SUPERFICIAL-MONTANTE A CAJA DE REGISTRO DE DESGÜE Ø4" 0.26 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.141 03.02.02.01 S5 RDS PIPE, PVC-D3034, BELL, SDR 35 Ø4" m 0.00% 0.26 33.28 27/01/2022 02/02/2022 7.00 7.00 4.75 33.28 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.7543 4.75 7.205714 0.14 4.7543 4.7543 4.7543 4.7543 4.7543 4.7543 0 28.5 43.234286 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
46.142 03.02.02.02 S5 RDS EL, 90DEG, BELL. BELL, PVC-D3034 Ø4" und 0.00% 0.26 6.76 27/01/2022 02/02/2022 7.00 7.00 0.97 6.76 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0.9657 0.97 0 ### 0.9657 0.9657 0.9657 0.9657 0.9657 0.9657 0 5.79 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.143 03.02.03 S5 RDS RED DE DRENAJE SUPERFICIAL-ENTRE CAJAS DE REGISTRO DE DESGÜE Ø6" 0.26 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
46.144 03.02.03.01 S5 RDS Pipe, PE D3350, PE, SDR 21 ø6" m 0.00% 0.26 1.30 27/01/2022 02/02/2022 7.00 7.00 0.19 1.30 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1857 0.19 0.371429 0.12 0.1857 0.1857 0.1857 0.1857 0.1857 0.1857 0 1.11 2.2285714 0.74 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
ÍTEM  DESCRIPCIÓN 
METRADO
SALDO
Dur.
8W
Dur. P6 Metrado
diario
ÍTEM  DESCRIPCIÓN 
METRADO
SALDO
Dur.
8W
Dur. P6 Metrado
diario
47 04 S5 SISTEMA DE RED DE AGUA POTABLE, AGUAS NEGRAS Y AGUAS GRISES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
48 04.01 S5 RAP RED DE AGUA POTABLE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
49 04.01.01 S5 RAP DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
64 23.04.01.02 S5 RAP CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
65 04.01.01.02.01 S5 RAP COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 0.00% 1.00 31/12/2021 03/02/2022 4.00 35.00 0.25 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0286 0.0286 0.0286 0.0286 0.0286 0.0286 0.0286 0.2 1.2353 0.21 0.0286 0.0286 0.0286 0.0286 0.0286 0.0286 0.0286 0.2 1.2353 0.21 0.0286 0.0286 0.0286 0.0286 0.0286 0.0286 0.0286 0.2 1.2353 0.21 0.0286 0.0286 0.0286 0.0286 0.0286 0.0286 0.0286 0.2 1.2353 0.21 0.0286 0.0286 0.0286 0.0286 0.0286 0.0286 0.0286 0.2 1.2353 0.21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
66 04.01.01.02 S5 RAP CONCRETO SIMPLE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
67 04.01.01.03.01 S5 RAP COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 3 17.4999 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
68 04.01.01.03.02 S5 RAP ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 13.00 02/01/2022 04/01/2022 3.00 3.00 4.33 13.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 4.3333 4.3333 4.3333 0 0 13 32.1178 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
69 04.01.01.03.03 S5 RAP SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 116.20 03/01/2022 06/01/2022 4.00 4.00 29.05 116.20 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 29.05 29.05 29.05 29.05 116 13.556667 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
70 04.01.01.04 S5 RAP CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
71 04.01.01.04.01 S5 RAP CURADO DE CONCRETO CON ANTISOL m2 0.00% 17.00 08/01/2022 10/01/2022 3.00 3.00 5.67 17.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.6667 5.6667 5.6667 0 0 0 17 2.3375 1.17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
72 04.01.01.05 S5 RAP SUMINISTRO E INSTALACIÓN DE CAJA DE VÁLVULA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
73 04.01.01.05.01 S5 RAP SUMINISTRO E INSTALACIÓN DE CAJAS DE CONCRETO PREFABRICAD und 0.00% 17.00 11/01/2022 11/01/2022 1.00 1.00 17.00 17.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17 0 0 17 13.6 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
74 04.01.01.06 S5 RAP CARPINTERIA METALICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75 04.01.01.06.01 S5 RAP SUMINISTRO E INSTALACIÓN DE REJILLA DE SOPORTE EN POZOS D und 0.00% 8.00 12/01/2022 12/01/2022 1.00 1.00 8.00 8.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 0 8 84 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.1 04.01.01 S5 RAP-EXT DISCIPLINA: CIVIL - 10001 0.33 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.2 04.01.01.01 S5 RAP-EXT MOVIMIENTO DE TIERRAS PARA TUBERÍAS Y PUNTOS DE AGUA- RED DE AGUA POTABLE 0.33 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.3 04.01.01.01.01 S5 RAP-EXT EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 94.79% 0.33 8.41 31/12/2021 06/01/2022 7.00 21.00 1.20 8.41 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 1.2014 1.2014 1.2014 1.2014 1.2014 1.2014 1.2014 8.41 12.214524 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.4 04.01.01.01.02 S5 RAP-EXT EXCAVACION P/POZOS DE PUNTOS DE AGUA m3 33.33% 0.33 0.44 31/12/2021 02/01/2022 3.00 17.00 0.15 0.44 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1467 0.1467 0.1467 0 0 0 0 0.44 2.728 0.68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.5 04.01.01.01.03 S5 RAP-EXT REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 93.75% 0.33 38.80 31/12/2021 06/01/2022 7.00 21.00 5.54 38.80 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 5.5429 5.5429 5.5429 5.5429 5.5429 5.5429 5.5429 38.8 4.947 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.6 04.01.01.01.04 S5 RAP-EXT TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= m3 -KM 90.17% 0.33 2.60 31/12/2021 06/01/2022 7.00 21.00 0.37 2.60 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.3714 0.3714 0.3714 0.3714 0.3714 0.3714 0.3714 2.6 0.403 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.7 04.01.01.01.05 S5 RAP-EXT TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM
m3 -KM 89.95% 0.33 15.22 31/12/2021 06/01/2022 7.00 21.00 2.17 15.22 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 2.1743 2.1743 2.1743 2.1743 2.1743 2.1743 2.1743 15.2 0.5580667 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.8 04.01.01.01.06 S5 RAP-EXT COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 85.51% 0.33 2.92 31/12/2021 06/01/2022 7.00 21.00 0.42 2.92 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.4171 0.4171 0.4171 0.4171 0.4171 0.4171 0.4171 2.92 9.9766667 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.9 04.01.01.01.07 S5 RAP-EXT TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 83.03% 0.33 10.47 31/12/2021 06/01/2022 7.00 21.00 1.50 10.47 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 1.4957 1.4957 1.4957 1.4957 1.4957 1.4957 1.4957 10.5 1.62285 0.16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.10 04.01.01.01.08 S5 RAP-EXT TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 Km3 -KM 82.98% 0.33 60.90 31/12/2021 06/01/2022 7.00 21.00 8.70 60.90 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 8.7 8.7 8.7 8.7 8.7 8.7 8.7 60.9 2.233 0.17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.11 04.01.01.01.09 S5 RAP-EXT RELLENO CON MATERIAL 2B DE PRESTAMO m3 77.35% 0.33 10.76 31/12/2021 06/01/2022 7.00 21.00 1.54 10.76 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 1.5371 1.5371 1.5371 1.5371 1.5371 1.5371 1.5371 10.8 19.099 0.23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.12 04.01.01.01.10 S5 RAP-EXT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 77.37% 0.33 21.20 31/12/2021 06/01/2022 7.00 21.00 3.03 21.20 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 3.0286 3.0286 3.0286 3.0286 3.0286 3.0286 3.0286 21.2 42.93 0.23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.13 04.01.01.01.11 S5 RAP-EXT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 89.33% 0.33 9.09 31/12/2021 06/01/2022 7.00 21.00 1.30 9.09 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 1.2986 1.2986 1.2986 1.2986 1.2986 1.2986 1.2986 9.09 1.043532 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.14 04.01.01.01.12 S5 RAP-EXT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 89.42% 0.33 18.02 31/12/2021 06/01/2022 7.00 21.00 2.57 18.02 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 2.5743 2.5743 2.5743 2.5743 2.5743 2.5743 2.5743 18 0.841534 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.15 04.01.01.01.13 S5 RAP-EXT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 89.36% 0.33 9.06 31/12/2021 06/01/2022 7.00 21.00 1.29 9.06 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 1.2943 1.2943 1.2943 1.2943 1.2943 1.2943 1.2943 9.06 2.1277273 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.16 04.01.01 S5 RAP-S DISCIPLINA: CIVIL - 100013 - 100014 0.09 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.17 04.01.01.01 S5 RAP-S MOVIMIENTO DE TIERRAS PARA TUBERÍAS Y PUNTOS DE AGUA- RED DE AGUA POTABLE 0.09 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.18 04.01.01.01.01 S5 RAP-S EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 94.79% 0.09 2.29 31/12/2021 06/01/2022 7.00 21.00 0.33 2.29 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.3271 0.3271 0.3271 0.3271 0.3271 0.3271 0.3271 2.29 3.3259524 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.19 04.01.01.01.02 S5 RAP-S EXCAVACION P/POZOS DE PUNTOS DE AGUA m3 33.33% 0.09 0.12 14/01/2022 16/01/2022 3.00 31.00 0.04 0.12 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.04 0.04 0.04 0 0 0 0 0.12 0.744 0.74 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.20 04.01.01.01.03 S5 RAP-S REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 93.75% 0.09 10.58 31/12/2021 06/01/2022 7.00 21.00 1.51 10.58 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 1.5114 1.5114 1.5114 1.5114 1.5114 1.5114 1.5114 10.6 1.34895 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.21 04.01.01.01.04 S5 RAP-S TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= m3 -KM 90.17% 0.09 0.71 31/12/2021 06/01/2022 7.00 21.00 0.10 0.71 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1014 0.1014 0.1014 0.1014 0.1014 0.1014 0.1014 0.71 0.11005 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.22 04.01.01.01.05 S5 RAP-S TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM
m3 -KM 89.95% 0.09 4.15 31/12/2021 06/01/2022 7.00 21.00 0.59 4.15 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.5929 0.5929 0.5929 0.5929 0.5929 0.5929 0.5929 4.15 0.1521667 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.23 04.01.01.01.06 S5 RAP-S COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 85.51% 0.09 0.80 31/12/2021 06/01/2022 7.00 21.00 0.11 0.80 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1143 0.1143 0.1143 0.1143 0.1143 0.1143 0.1143 0.8 2.7333333 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.24 04.01.01.01.07 S5 RAP-S TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 83.03% 0.09 2.86 31/12/2021 06/01/2022 7.00 21.00 0.41 2.86 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.4086 0.4086 0.4086 0.4086 0.4086 0.4086 0.4086 2.86 0.4433 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.25 04.01.01.01.08 S5 RAP-S TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 Km3 -KM 82.98% 0.09 16.61 31/12/2021 06/01/2022 7.00 21.00 2.37 16.61 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 2.3729 2.3729 2.3729 2.3729 2.3729 2.3729 2.3729 16.6 0.6090333 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.26 04.01.01.01.09 S5 RAP-S RELLENO CON MATERIAL 2B DE PRESTAMO m3 77.35% 0.09 2.94 31/12/2021 06/01/2022 7.00 21.00 0.42 2.94 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.42 0.42 0.42 0.42 0.42 0.42 0.42 2.94 5.2185 0.23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.27 04.01.01.01.10 S5 RAP-S RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 77.37% 0.09 5.78 31/12/2021 06/01/2022 7.00 21.00 0.83 5.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.8257 0.8257 0.8257 0.8257 0.8257 0.8257 0.8257 5.78 11.7045 0.23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.28 04.01.01.01.11 S5 RAP-S ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 89.33% 0.09 2.48 31/12/2021 06/01/2022 7.00 21.00 0.35 2.48 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.3543 0.3543 0.3543 0.3543 0.3543 0.3543 0.3543 2.48 0.284704 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.29 04.01.01.01.12 S5 RAP-S ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 89.42% 0.09 4.92 31/12/2021 06/01/2022 7.00 21.00 0.70 4.92 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.7029 0.7029 0.7029 0.7029 0.7029 0.7029 0.7029 4.92 0.229764 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.30 04.01.01.01.13 S5 RAP-S APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 89.36% 0.09 2.47 31/12/2021 06/01/2022 7.00 21.00 0.35 2.47 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.3529 0.3529 0.3529 0.3529 0.3529 0.3529 0.3529 2.47 0.5800758 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.31 04.01.01 S5 RAP-OyP DISCIPLINA: CIVIL - 100017 0.02 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.32 04.01.01.01 S5 RAP-OyP MOVIMIENTO DE TIERRAS PARA TUBERÍAS Y PUNTOS DE AGUA- RED DE AGUA POTABLE 0.02 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.33 04.01.01.01.01 S5 RAP-OyP EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 94.79% 0.02 0.51 31/12/2021 06/01/2022 7.00 21.00 0.07 0.51 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0729 0.0729 0.0729 0.0729 0.0729 0.0729 0.0729 0.51 0.7407143 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.34 04.01.01.01.02 S5 RAP-OyP EXCAVACION P/POZOS DE PUNTOS DE AGUA m3 33.33% 0.02 0.03 14/01/2022 16/01/2022 3.00 31.00 0.01 0.03 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0.01 0.01 0.01 0 0 0 0 0.03 0.186 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.35 04.01.01.01.03 S5 RAP-OyP REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 93.75% 0.02 2.35 31/12/2021 06/01/2022 7.00 21.00 0.34 2.35 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.3357 0.3357 0.3357 0.3357 0.3357 0.3357 0.3357 2.35 0.299625 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.36 04.01.01.01.04 S5 RAP-OyP TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= m3 -KM 90.17% 0.02 0.16 31/12/2021 06/01/2022 7.00 21.00 0.02 0.16 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0.0229 0.0229 0.0229 0.0229 0.0229 0.0229 0.0229 0.16 0.0248 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.37 04.01.01.01.05 S5 RAP-OyP TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM
m3 -KM 89.95% 0.02 0.92 31/12/2021 06/01/2022 7.00 21.00 0.13 0.92 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0.1314 0.1314 0.1314 0.1314 0.1314 0.1314 0.1314 0.92 0.0337333 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.38 04.01.01.01.06 S5 RAP-OyP COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 85.51% 0.02 0.18 31/12/2021 06/01/2022 7.00 21.00 0.03 0.18 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0257 0.0257 0.0257 0.0257 0.0257 0.0257 0.0257 0.18 0.615 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.39 04.01.01.01.07 S5 RAP-OyP TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 83.03% 0.02 0.63 31/12/2021 06/01/2022 7.00 21.00 0.09 0.63 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.63 0.09765 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.40 04.01.01.01.08 S5 RAP-OyP TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 Km3 -KM 82.98% 0.02 3.69 31/12/2021 06/01/2022 7.00 21.00 0.53 3.69 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.5271 0.5271 0.5271 0.5271 0.5271 0.5271 0.5271 3.69 0.1353 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.41 04.01.01.01.09 S5 RAP-OyP RELLENO CON MATERIAL 2B DE PRESTAMO m3 77.35% 0.02 0.65 31/12/2021 06/01/2022 7.00 21.00 0.09 0.65 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0929 0.0929 0.0929 0.0929 0.0929 0.0929 0.0929 0.65 1.15375 0.23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.42 04.01.01.01.10 S5 RAP-OyP RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 77.37% 0.02 1.29 31/12/2021 06/01/2022 7.00 21.00 0.18 1.29 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1843 0.1843 0.1843 0.1843 0.1843 0.1843 0.1843 1.29 2.61225 0.22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.43 04.01.01.01.11 S5 RAP-OyP ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 89.33% 0.02 0.55 31/12/2021 06/01/2022 7.00 21.00 0.08 0.55 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0786 0.0786 0.0786 0.0786 0.0786 0.0786 0.0786 0.55 0.06314 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.44 04.01.01.01.12 S5 RAP-OyP ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 89.42% 0.02 1.09 31/12/2021 06/01/2022 7.00 21.00 0.16 1.09 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0.1557 0.1557 0.1557 0.1557 0.1557 0.1557 0.1557 1.09 0.050903 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.45 04.01.01.01.13 S5 RAP-OyP APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 89.36% 0.02 0.55 31/12/2021 06/01/2022 7.00 21.00 0.08 0.55 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0786 0.0786 0.0786 0.0786 0.0786 0.0786 0.0786 0.55 0.1291667 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.46 04.01.01 S5 RAP-OyP DISCIPLINA: CIVIL - 100018 0.01 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.47 04.01.01.01 S5 RAP-OyP MOVIMIENTO DE TIERRAS PARA TUBERÍAS Y PUNTOS DE AGUA- RED DE AGUA POTABLE 0.01 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.48 04.01.01.01.01 S5 RAP-OyP EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 94.79% 0.01 0.25 31/12/2021 06/01/2022 7.00 21.00 0.04 0.25 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0357 0.0357 0.0357 0.0357 0.0357 0.0357 0.0357 0.25 0.3630952 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.49 04.01.01.01.02 S5 RAP-OyP EXCAVACION P/POZOS DE PUNTOS DE AGUA m3 33.33% 0.01 0.01 14/01/2022 16/01/2022 3.00 31.00 0.00 0.01 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0.0033 0.0033 0.0033 0 0 0 0 0.01 0.062 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.50 04.01.01.01.03 S5 RAP-OyP REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 93.75% 0.01 1.18 31/12/2021 06/01/2022 7.00 21.00 0.17 1.18 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1686 0.1686 0.1686 0.1686 0.1686 0.1686 0.1686 1.18 0.15045 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.51 04.01.01.01.04 S5 RAP-OyP TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= m3 -KM 90.17% 0.01 0.08 31/12/2021 06/01/2022 7.00 21.00 0.01 0.08 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0.08 0.0124 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.52 04.01.01.01.05 S5 RAP-OyP TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM
m3 -KM 89.95% 0.01 0.46 31/12/2021 06/01/2022 7.00 21.00 0.07 0.46 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0.0657 0.0657 0.0657 0.0657 0.0657 0.0657 0.0657 0.46 0.0168667 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.53 04.01.01.01.06 S5 RAP-OyP COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 85.51% 0.01 0.09 31/12/2021 06/01/2022 7.00 21.00 0.01 0.09 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0129 0.0129 0.0129 0.0129 0.0129 0.0129 0.0129 0.09 0.3075 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.54 04.01.01.01.07 S5 RAP-OyP TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 83.03% 0.01 0.32 31/12/2021 06/01/2022 7.00 21.00 0.05 0.32 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0.0457 0.0457 0.0457 0.0457 0.0457 0.0457 0.0457 0.32 0.0496 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.55 04.01.01.01.08 S5 RAP-OyP TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 Km3 -KM 82.98% 0.01 1.85 31/12/2021 06/01/2022 7.00 21.00 0.26 1.85 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0.2643 0.2643 0.2643 0.2643 0.2643 0.2643 0.2643 1.85 0.0678333 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.56 04.01.01.01.09 S5 RAP-OyP RELLENO CON MATERIAL 2B DE PRESTAMO m3 77.35% 0.01 0.33 31/12/2021 06/01/2022 7.00 21.00 0.05 0.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0471 0.0471 0.0471 0.0471 0.0471 0.0471 0.0471 0.33 0.58575 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.57 04.01.01.01.10 S5 RAP-OyP RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 77.37% 0.01 0.64 31/12/2021 06/01/2022 7.00 21.00 0.09 0.64 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0914 0.0914 0.0914 0.0914 0.0914 0.0914 0.0914 0.64 1.296 0.22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.58 04.01.01.01.11 S5 RAP-OyP ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 89.33% 0.01 0.28 31/12/2021 06/01/2022 7.00 21.00 0.04 0.28 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.28 0.032144 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.59 04.01.01.01.12 S5 RAP-OyP ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 89.42% 0.01 0.55 31/12/2021 06/01/2022 7.00 21.00 0.08 0.55 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0.0786 0.0786 0.0786 0.0786 0.0786 0.0786 0.0786 0.55 0.025685 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.60 04.01.01.01.13 S5 RAP-OyP APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 89.36% 0.01 0.27 31/12/2021 06/01/2022 7.00 21.00 0.04 0.27 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0386 0.0386 0.0386 0.0386 0.0386 0.0386 0.0386 0.27 0.0634091 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.61 04.01.01 S5 RAP-L DISCIPLINA: CIVIL - 100025 0.09 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.62 04.01.01.01 S5 RAP-L MOVIMIENTO DE TIERRAS PARA TUBERÍAS Y PUNTOS DE AGUA- RED DE AGUA POTABLE 0.09 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.63 04.01.01.01.01 S5 RAP-L EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 94.79% 0.09 2.29 07/01/2022 13/01/2022 7.00 28.00 0.33 2.29 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3271 0.3271 0.3271 0.3271 0.3271 0.3271 0.3271 2.29 3.32595238 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.64 04.01.01.01.02 S5 RAP-L EXCAVACION P/POZOS DE PUNTOS DE AGUA m3 33.33% 0.09 0.12 21/01/2022 23/01/2022 3.00 38.00 0.04 0.12 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.04 0.04 0.04 0 0 0 0 0.12 0.744 0.74 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.65 04.01.01.01.03 S5 RAP-L REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 93.75% 0.09 10.58 07/01/2022 13/01/2022 7.00 28.00 1.51 10.58 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.5114 1.5114 1.5114 1.5114 1.5114 1.5114 1.5114 10.58 1.34895 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.66 04.01.01.01.04 S5 RAP-L TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= m3 -KM 90.17% 0.09 0.71 07/01/2022 13/01/2022 7.00 28.00 0.10 0.71 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1014 0.1014 0.1014 0.1014 0.1014 0.1014 0.1014 0.71 0.11005 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.67 04.01.01.01.05 S5 RAP-L TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM
m3 -KM 89.95% 0.09 4.15 07/01/2022 13/01/2022 7.00 28.00 0.59 4.15 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5929 0.5929 0.5929 0.5929 0.5929 0.5929 0.5929 4.15 0.15216667 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.68 04.01.01.01.06 S5 RAP-L COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 85.51% 0.09 0.80 07/01/2022 13/01/2022 7.00 28.00 0.11 0.80 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1143 0.1143 0.1143 0.1143 0.1143 0.1143 0.1143 0.8 2.73333333 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.69 04.01.01.01.07 S5 RAP-L TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 83.03% 0.09 2.86 07/01/2022 13/01/2022 7.00 28.00 0.41 2.86 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4086 0.4086 0.4086 0.4086 0.4086 0.4086 0.4086 2.86 0.4433 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.70 04.01.01.01.08 S5 RAP-L TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 Km3 -KM 82.98% 0.09 16.61 07/01/2022 13/01/2022 7.00 28.00 2.37 16.61 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.3729 2.3729 2.3729 2.3729 2.3729 2.3729 2.3729 16.61 0.60903333 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.71 04.01.01.01.09 S5 RAP-L RELLENO CON MATERIAL 2B DE PRESTAMO m3 77.35% 0.09 2.94 07/01/2022 13/01/2022 7.00 28.00 0.42 2.94 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.42 0.42 0.42 0.42 0.42 0.42 0.42 2.94 5.2185 0.23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.72 04.01.01.01.10 S5 RAP-L RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 77.37% 0.09 5.78 07/01/2022 13/01/2022 7.00 28.00 0.83 5.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.8257 0.8257 0.8257 0.8257 0.8257 0.8257 0.8257 5.78 11.7045 0.23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.73 04.01.01.01.11 S5 RAP-L ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 89.33% 0.09 2.48 07/01/2022 13/01/2022 7.00 28.00 0.35 2.48 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3543 0.3543 0.3543 0.3543 0.3543 0.3543 0.3543 2.48 0.284704 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.74 04.01.01.01.12 S5 RAP-L ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 89.42% 0.09 4.92 07/01/2022 13/01/2022 7.00 28.00 0.70 4.92 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7029 0.7029 0.7029 0.7029 0.7029 0.7029 0.7029 4.92 0.229764 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.75 04.01.01.01.13 S5 RAP-L APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 89.36% 0.09 2.47 07/01/2022 13/01/2022 7.00 28.00 0.35 2.47 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3529 0.3529 0.3529 0.3529 0.3529 0.3529 0.3529 2.47 0.58007576 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.76 04.01.01 S5 RAP-F DISCIPLINA: CIVIL - 100033 0.19 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.77 04.01.01.01 S5 RAP-F MOVIMIENTO DE TIERRAS PARA TUBERÍAS Y PUNTOS DE AGUA- RED DE AGUA POTABLE 0.19 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.78 04.01.01.01.01 S5 RAP-F EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 98.69% 0.19 1.21 07/01/2022 03/02/2022 28.00 49.00 0.04 1.21 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.3025 0.43934524 0 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.3 0.439345 0 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.3 0.439345 0 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.3 0.4393452 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.79 04.01.01.01.02 S5 RAP-F EXCAVACION P/POZOS DE PUNTOS DE AGUA m3 33.33% 0.19 0.25 21/01/2022 23/01/2022 3.00 38.00 0.08 0.25 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0833 0.0833 0.0833 0 0 0 0 0.25 1.55 0.78 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.80 04.01.01.01.03 S5 RAP-F REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 98.44% 0.19 5.58 07/01/2022 03/02/2022 28.00 49.00 0.20 5.58 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1993 0.1993 0.1993 0.1993 0.1993 0.1993 0.1993 1.395 0.1778625 0 0.1993 0.1993 0.1993 0.1993 0.1993 0.1993 0.1993 1.4 0.177863 0 0.1993 0.1993 0.1993 0.1993 0.1993 0.1993 0.1993 1.4 0.177863 0 0.1993 0.1993 0.1993 0.1993 0.1993 0.1993 0.1993 1.4 0.1778625 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.81 04.01.01.01.04 S5 RAP-F TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= m3 -KM 97.54% 0.19 0.37 07/01/2022 03/02/2022 28.00 49.00 0.01 0.37 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0132 0.0132 0.0132 0.0132 0.0132 0.0132 0.0132 0.0925 0.0143375 0.01 0.0132 0.0132 0.0132 0.0132 0.0132 0.0132 0.0132 0.09 0.014338 0.01 0.0132 0.0132 0.0132 0.0132 0.0132 0.0132 0.0132 0.09 0.014338 0.01 0.0132 0.0132 0.0132 0.0132 0.0132 0.0132 0.0132 0.09 0.0143375 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.82 04.01.01.01.05 S5 RAP-F TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM
m3 -KM 97.49% 0.19 2.19 07/01/2022 03/02/2022 28.00 49.00 0.08 2.19 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0782 0.0782 0.0782 0.0782 0.0782 0.0782 0.0782 0.5475 0.020075 0.01 0.0782 0.0782 0.0782 0.0782 0.0782 0.0782 0.0782 0.55 0.020075 0.01 0.0782 0.0782 0.0782 0.0782 0.0782 0.0782 0.0782 0.55 0.020075 0.01 0.0782 0.0782 0.0782 0.0782 0.0782 0.0782 0.0782 0.55 0.020075 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.83 04.01.01.01.06 S5 RAP-F COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 96.38% 0.19 0.42 07/01/2022 03/02/2022 28.00 49.00 0.02 0.42 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.105 0.35875 0.01 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.11 0.35875 0.01 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.11 0.35875 0.01 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.11 0.35875 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.84 04.01.01.01.07 S5 RAP-F TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 95.75% 0.19 1.51 07/01/2022 03/02/2022 28.00 49.00 0.05 1.51 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0539 0.0539 0.0539 0.0539 0.0539 0.0539 0.0539 0.3775 0.0585125 0.01 0.0539 0.0539 0.0539 0.0539 0.0539 0.0539 0.0539 0.38 0.058513 0.01 0.0539 0.0539 0.0539 0.0539 0.0539 0.0539 0.0539 0.38 0.058513 0.01 0.0539 0.0539 0.0539 0.0539 0.0539 0.0539 0.0539 0.38 0.0585125 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.85 04.01.01.01.08 S5 RAP-F TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 Km3 -KM 95.74% 0.19 8.77 07/01/2022 03/02/2022 28.00 49.00 0.31 8.77 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3132 0.3132 0.3132 0.3132 0.3132 0.3132 0.3132 2.1925 0.08039167 0.01 0.3132 0.3132 0.3132 0.3132 0.3132 0.3132 0.3132 2.19 0.080392 0.01 0.3132 0.3132 0.3132 0.3132 0.3132 0.3132 0.3132 2.19 0.080392 0.01 0.3132 0.3132 0.3132 0.3132 0.3132 0.3132 0.3132 2.19 0.0803917 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.86 04.01.01.01.09 S5 RAP-F RELLENO CON MATERIAL 2B DE PRESTAMO m3 94.35% 0.19 1.55 07/01/2022 03/02/2022 28.00 49.00 0.06 1.55 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0554 0.0554 0.0554 0.0554 0.0554 0.0554 0.0554 0.3875 0.6878125 0.01 0.0554 0.0554 0.0554 0.0554 0.0554 0.0554 0.0554 0.39 0.687813 0.01 0.0554 0.0554 0.0554 0.0554 0.0554 0.0554 0.0554 0.39 0.687813 0.01 0.0554 0.0554 0.0554 0.0554 0.0554 0.0554 0.0554 0.39 0.6878125 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.87 04.01.01.01.10 S5 RAP-F RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 94.34% 0.19 3.05 07/01/2022 03/02/2022 28.00 49.00 0.11 3.05 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1089 0.1089 0.1089 0.1089 0.1089 0.1089 0.1089 0.7625 1.5440625 0.01 0.1089 0.1089 0.1089 0.1089 0.1089 0.1089 0.1089 0.76 1.544063 0.01 0.1089 0.1089 0.1089 0.1089 0.1089 0.1089 0.1089 0.76 1.544063 0.01 0.1089 0.1089 0.1089 0.1089 0.1089 0.1089 0.1089 0.76 1.5440625 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.88 04.01.01.01.11 S5 RAP-F ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 97.33% 0.19 1.31 07/01/2022 03/02/2022 28.00 49.00 0.05 1.31 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0468 0.0468 0.0468 0.0468 0.0468 0.0468 0.0468 0.3275 0.037597 0.01 0.0468 0.0468 0.0468 0.0468 0.0468 0.0468 0.0468 0.33 0.037597 0.01 0.0468 0.0468 0.0468 0.0468 0.0468 0.0468 0.0468 0.33 0.037597 0.01 0.0468 0.0468 0.0468 0.0468 0.0468 0.0468 0.0468 0.33 0.037597 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.89 04.01.01.01.12 S5 RAP-F ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 97.36% 0.19 2.59 07/01/2022 03/02/2022 28.00 49.00 0.09 2.59 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0925 0.0925 0.0925 0.0925 0.0925 0.0925 0.0925 0.6475 0.03023825 0.01 0.0925 0.0925 0.0925 0.0925 0.0925 0.0925 0.0925 0.65 0.030238 0.01 0.0925 0.0925 0.0925 0.0925 0.0925 0.0925 0.0925 0.65 0.030238 0.01 0.0925 0.0925 0.0925 0.0925 0.0925 0.0925 0.0925 0.65 0.0302383 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.90 04.01.01.01.13 S5 RAP-F APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 97.34% 0.19 1.30 07/01/2022 03/02/2022 28.00 49.00 0.05 1.30 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0464 0.0464 0.0464 0.0464 0.0464 0.0464 0.0464 0.325 0.07632576 0.01 0.0464 0.0464 0.0464 0.0464 0.0464 0.0464 0.0464 0.33 0.076326 0.01 0.0464 0.0464 0.0464 0.0464 0.0464 0.0464 0.0464 0.33 0.076326 0.01 0.0464 0.0464 0.0464 0.0464 0.0464 0.0464 0.0464 0.33 0.0763258 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.91 04.01.01 S5 RAP-A DISCIPLINA: CIVIL - 100037 0.07 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.92 04.01.01.01 S5 RAP-A MOVIMIENTO DE TIERRAS PARA TUBERÍAS Y PUNTOS DE AGUA- RED DE AGUA POTABLE 0.07 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.93 04.01.01.01.01 S5 RAP-A EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 95.53% 0.07 1.53 17/12/2021 30/12/2021 14.00 14.00 0.11 1.53 X 0.1093 0.1093 0.1093 0.1093 0.1093 0.1093 0.1093 0.77 1.11 0.02 0.1093 0.1093 0.1093 0.1093 0.1093 0.1093 0.1093 0.77 1.1110714 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.94 04.01.01.01.02 S5 RAP-A EXCAVACION P/POZOS DE PUNTOS DE AGUA m3 33.33% 0.07 0.09 31/12/2021 02/01/2022 3.00 17.00 0.03 0.09 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.03 0.03 0.03 0 0 0 0 0.09 0.558 0.56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.95 04.01.01.01.03 S5 RAP-A REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 94.64% 0.07 7.05 17/12/2021 30/12/2021 14.00 14.00 0.50 7.05 X 0.5036 0.5036 0.5036 0.5036 0.5036 0.5036 0.5036 3.53 0.45 0.03 0.5036 0.5036 0.5036 0.5036 0.5036 0.5036 0.5036 3.53 0.4494375 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.96 04.01.01.01.04 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= m3 -KM 91.57% 0.07 0.47 17/12/2021 30/12/2021 14.00 14.00 0.03 0.47 X 0.0336 0.0336 0.0336 0.0336 0.0336 0.0336 0.0336 0.24 0.04 0.04 0.0336 0.0336 0.0336 0.0336 0.0336 0.0336 0.0336 0.24 0.036425 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.97 04.01.01.01.05 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM
m3 -KM 91.38% 0.07 2.77 17/12/2021 30/12/2021 14.00 14.00 0.20 2.77 X 0.1979 0.1979 0.1979 0.1979 0.1979 0.1979 0.1979 1.39 0.05 0.05 0.1979 0.1979 0.1979 0.1979 0.1979 0.1979 0.1979 1.39 0.0507833 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.98 04.01.01.01.06 S5 RAP-A COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 87.58% 0.07 0.53 17/12/2021 30/12/2021 14.00 14.00 0.04 0.53 X 0.0379 0.0379 0.0379 0.0379 0.0379 0.0379 0.0379 0.27 0.91 0.06 0.0379 0.0379 0.0379 0.0379 0.0379 0.0379 0.0379 0.27 0.9054167 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.99 04.01.01.01.07 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 85.45% 0.07 1.90 17/12/2021 30/12/2021 14.00 14.00 0.14 1.90 X 0.1357 0.1357 0.1357 0.1357 0.1357 0.1357 0.1357 0.95 0.15 0.07 0.1357 0.1357 0.1357 0.1357 0.1357 0.1357 0.1357 0.95 0.14725 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.100 04.01.01.01.08 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 Km3 -KM 85.41% 0.07 11.07 17/12/2021 30/12/2021 14.00 14.00 0.79 11.07 X 0.7907 0.7907 0.7907 0.7907 0.7907 0.7907 0.7907 5.54 0.20 0.07 0.7907 0.7907 0.7907 0.7907 0.7907 0.7907 0.7907 5.54 0.20295 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.101 04.01.01.01.09 S5 RAP-A RELLENO CON MATERIAL 2B DE PRESTAMO m3 80.58% 0.07 1.96 17/12/2021 30/12/2021 14.00 14.00 0.14 1.96 X 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.98 1.74 0.1 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.98 1.7395 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.102 04.01.01.01.10 S5 RAP-A RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 80.61% 0.07 3.86 17/12/2021 30/12/2021 14.00 14.00 0.28 3.86 X 0.2757 0.2757 0.2757 0.2757 0.2757 0.2757 0.2757 1.93 3.91 0.1 0.2757 0.2757 0.2757 0.2757 0.2757 0.2757 0.2757 1.93 3.90825 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.103 04.01.01.01.11 S5 RAP-A ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 90.85% 0.07 1.65 17/12/2021 30/12/2021 14.00 14.00 0.12 1.65 X 0.1179 0.1179 0.1179 0.1179 0.1179 0.1179 0.1179 0.83 0.09 0.05 0.1179 0.1179 0.1179 0.1179 0.1179 0.1179 0.1179 0.83 0.09471 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.104 04.01.01.01.12 S5 RAP-A ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 90.93% 0.07 3.28 17/12/2021 30/12/2021 14.00 14.00 0.23 3.28 X 0.2343 0.2343 0.2343 0.2343 0.2343 0.2343 0.2343 1.64 0.08 0.04 0.2343 0.2343 0.2343 0.2343 0.2343 0.2343 0.2343 1.64 0.076588 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.105 04.01.01.01.13 S5 RAP-A APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 90.88% 0.07 1.65 17/12/2021 30/12/2021 14.00 14.00 0.12 1.65 X 0.1179 0.1179 0.1179 0.1179 0.1179 0.1179 0.1179 0.83 0.19 0.05 0.1179 0.1179 0.1179 0.1179 0.1179 0.1179 0.1179 0.83 0.19375 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.106 04.01.01 S5 RAP-A DISCIPLINA: CIVIL - 100038 0.05 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.107 04.01.01.01 S5 RAP-A MOVIMIENTO DE TIERRAS PARA TUBERÍAS Y PUNTOS DE AGUA- RED DE AGUA POTABLE 0.05 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.108 04.01.01.01.01 S5 RAP-A EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 94.79% 0.05 1.27 17/12/2021 30/12/2021 14.00 14.00 0.09 1.27 X 0.0907 0.0907 0.0907 0.0907 0.0907 0.0907 0.0907 0.64 0.92 0.03 0.0907 0.0907 0.0907 0.0907 0.0907 0.0907 0.0907 0.64 0.9222619 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.109 04.01.01.01.02 S5 RAP-A EXCAVACION P/POZOS DE PUNTOS DE AGUA m3 33.33% 0.05 0.07 31/12/2021 02/01/2022 3.00 17.00 0.02 0.07 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0233 0.0233 0.0233 0 0 0 0 0.07 0.434 0.43 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.110 04.01.01.01.03 S5 RAP-A REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 93.75% 0.05 5.88 17/12/2021 30/12/2021 14.00 14.00 0.42 5.88 X 0.42 0.42 0.42 0.42 0.42 0.42 0.42 2.94 0.37 0.03 0.42 0.42 0.42 0.42 0.42 0.42 0.42 2.94 0.37485 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.111 04.01.01.01.04 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= m3 -KM 90.17% 0.05 0.39 17/12/2021 30/12/2021 14.00 14.00 0.03 0.39 X 0.0279 0.0279 0.0279 0.0279 0.0279 0.0279 0.0279 0.2 0.03 0.03 0.0279 0.0279 0.0279 0.0279 0.0279 0.0279 0.0279 0.2 0.030225 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.112 04.01.01.01.05 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM
m3 -KM 89.93% 0.05 2.31 17/12/2021 30/12/2021 14.00 14.00 0.17 2.31 X 0.165 0.165 0.165 0.165 0.165 0.165 0.165 1.16 0.04 0.04 0.165 0.165 0.165 0.165 0.165 0.165 0.165 1.16 0.04235 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.113 04.01.01.01.06 S5 RAP-A COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 85.51% 0.05 0.44 17/12/2021 30/12/2021 14.00 14.00 0.03 0.44 X 0.0314 0.0314 0.0314 0.0314 0.0314 0.0314 0.0314 0.22 0.75 0.08 0.0314 0.0314 0.0314 0.0314 0.0314 0.0314 0.0314 0.22 0.7516667 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.114 04.01.01.01.07 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 82.99% 0.05 1.59 17/12/2021 30/12/2021 14.00 14.00 0.11 1.59 X 0.1136 0.1136 0.1136 0.1136 0.1136 0.1136 0.1136 0.8 0.12 0.12 0.1136 0.1136 0.1136 0.1136 0.1136 0.1136 0.1136 0.8 0.123225 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.115 04.01.01.01.08 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 Km3 -KM 82.97% 0.05 9.23 17/12/2021 30/12/2021 14.00 14.00 0.66 9.23 X 0.6593 0.6593 0.6593 0.6593 0.6593 0.6593 0.6593 4.62 0.17 0.08 0.6593 0.6593 0.6593 0.6593 0.6593 0.6593 0.6593 4.62 0.1692167 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.116 04.01.01.01.09 S5 RAP-A RELLENO CON MATERIAL 2B DE PRESTAMO m3 77.35% 0.05 1.63 17/12/2021 30/12/2021 14.00 14.00 0.12 1.63 X 0.1164 0.1164 0.1164 0.1164 0.1164 0.1164 0.1164 0.82 1.45 0.11 0.1164 0.1164 0.1164 0.1164 0.1164 0.1164 0.1164 0.82 1.446625 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.117 04.01.01.01.10 S5 RAP-A RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 77.37% 0.05 3.21 17/12/2021 30/12/2021 14.00 14.00 0.23 3.21 X 0.2293 0.2293 0.2293 0.2293 0.2293 0.2293 0.2293 1.61 3.25 0.11 0.2293 0.2293 0.2293 0.2293 0.2293 0.2293 0.2293 1.61 3.250125 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.118 04.01.01.01.11 S5 RAP-A ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 89.30% 0.05 1.38 17/12/2021 30/12/2021 14.00 14.00 0.10 1.38 X 0.0986 0.0986 0.0986 0.0986 0.0986 0.0986 0.0986 0.69 0.08 0.08 0.0986 0.0986 0.0986 0.0986 0.0986 0.0986 0.0986 0.69 0.079212 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.119 04.01.01.01.12 S5 RAP-A ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 89.42% 0.05 2.73 17/12/2021 30/12/2021 14.00 14.00 0.20 2.73 X 0.195 0.195 0.195 0.195 0.195 0.195 0.195 1.37 0.06 0.06 0.195 0.195 0.195 0.195 0.195 0.195 0.195 1.37 0.0637455 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.120 04.01.01.01.13 S5 RAP-A APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 89.36% 0.05 1.37 17/12/2021 30/12/2021 14.00 14.00 0.10 1.37 X 0.0979 0.0979 0.0979 0.0979 0.0979 0.0979 0.0979 0.69 0.16 0.05 0.0979 0.0979 0.0979 0.0979 0.0979 0.0979 0.0979 0.69 0.1608712 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.121 04.01.01 S5 RAP-A DISCIPLINA: CIVIL - 100044 - 100049 0.05 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.122 04.01.01.01 S5 RAP-A MOVIMIENTO DE TIERRAS PARA TUBERÍAS Y PUNTOS DE AGUA- RED DE AGUA POTABLE 0.05 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.123 04.01.01.01.01 S5 RAP-A EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 94.79% 0.05 1.27 17/12/2021 23/12/2021 7.00 7.00 0.18 1.27 X 0.1814 0.1814 0.1814 0.1814 0.1814 0.1814 0.1814 1.27 1.84 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.124 04.01.01.01.02 S5 RAP-A EXCAVACION P/POZOS DE PUNTOS DE AGUA m3 33.33% 0.05 0.07 24/12/2021 26/12/2021 3.00 10.00 0.02 0.07 X 0 0 0 0 0 0 0 0 0.00 0 0.0233 0.0233 0.0233 0 0 0 0 0.07 0.434 0.43 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.125 04.01.01.01.03 S5 RAP-A REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 93.75% 0.05 5.88 17/12/2021 23/12/2021 7.00 7.00 0.84 5.88 X 0.84 0.84 0.84 0.84 0.84 0.84 0.84 5.88 0.75 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.126 04.01.01.01.04 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= m3 -KM 90.17% 0.05 0.39 17/12/2021 23/12/2021 7.00 7.00 0.06 0.39 X 0.0557 0.0557 0.0557 0.0557 0.0557 0.0557 0.0557 0.39 0.06 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.127 04.01.01.01.05 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM
m3 -KM 89.95% 0.05 2.31 17/12/2021 23/12/2021 7.00 7.00 0.33 2.31 X 0.33 0.33 0.33 0.33 0.33 0.33 0.33 2.31 0.08 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.128 04.01.01.01.06 S5 RAP-A COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 85.51% 0.05 0.44 17/12/2021 23/12/2021 7.00 7.00 0.06 0.44 X 0.0629 0.0629 0.0629 0.0629 0.0629 0.0629 0.0629 0.44 1.50 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.129 04.01.01.01.07 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 83.03% 0.05 1.59 17/12/2021 23/12/2021 7.00 7.00 0.23 1.59 X 0.2271 0.2271 0.2271 0.2271 0.2271 0.2271 0.2271 1.59 0.25 0.25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.130 04.01.01.01.08 S5 RAP-A TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 Km3 -KM 82.98% 0.05 9.23 17/12/2021 23/12/2021 7.00 7.00 1.32 9.23 X 1.3186 1.3186 1.3186 1.3186 1.3186 1.3186 1.3186 9.23 0.34 0.17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.131 04.01.01.01.09 S5 RAP-A RELLENO CON MATERIAL 2B DE PRESTAMO m3 77.35% 0.05 1.63 17/12/2021 23/12/2021 7.00 7.00 0.23 1.63 X 0.2329 0.2329 0.2329 0.2329 0.2329 0.2329 0.2329 1.63 2.89 0.22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.132 04.01.01.01.10 S5 RAP-A RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 77.37% 0.05 3.21 17/12/2021 23/12/2021 7.00 7.00 0.46 3.21 X 0.4586 0.4586 0.4586 0.4586 0.4586 0.4586 0.4586 3.21 6.50 0.22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.133 04.01.01.01.11 S5 RAP-A ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 89.33% 0.05 1.38 17/12/2021 23/12/2021 7.00 7.00 0.20 1.38 X 0.1971 0.1971 0.1971 0.1971 0.1971 0.1971 0.1971 1.38 0.16 0.16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.134 04.01.01.01.12 S5 RAP-A ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 89.42% 0.05 2.73 17/12/2021 23/12/2021 7.00 7.00 0.39 2.73 X 0.39 0.39 0.39 0.39 0.39 0.39 0.39 2.73 0.13 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.135 04.01.01.01.13 S5 RAP-A APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 89.36% 0.05 1.37 17/12/2021 23/12/2021 7.00 7.00 0.20 1.37 X 0.1957 0.1957 0.1957 0.1957 0.1957 0.1957 0.1957 1.37 0.32 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.136 04.01.01 S5 RAP-C DISCIPLINA: CIVIL - 100083 0.10 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.137 04.01.01.01 S5 RAP-C MOVIMIENTO DE TIERRAS PARA TUBERÍAS Y PUNTOS DE AGUA- RED DE AGUA POTABLE 0.10 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
75.138 04.01.01.01.01 S5 RAP-C EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 100.00% 0.10 0.00 17/12/2021 23/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.139 04.01.01.01.02 S5 RAP-C EXCAVACION P/POZOS DE PUNTOS DE AGUA m3 33.33% 0.10 0.13 24/12/2021 26/12/2021 3.00 10.00 0.04 0.13 X 0 0 0 0 0 0 0 0 0.00 0 0.0433 0.0433 0.0433 0 0 0 0 0.13 0.806 0.81 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.140 04.01.01.01.03 S5 RAP-C REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.10 0.00 17/12/2021 23/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.141 04.01.01.01.04 S5 RAP-C TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= m3 -KM 100.00% 0.10 0.00 17/12/2021 23/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.142 04.01.01.01.05 S5 RAP-C TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM
m3 -KM 100.00% 0.10 0.00 17/12/2021 23/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.143 04.01.01.01.06 S5 RAP-C COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 100.00% 0.10 0.00 17/12/2021 23/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.144 04.01.01.01.07 S5 RAP-C TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 100.00% 0.10 0.00 17/12/2021 23/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.145 04.01.01.01.08 S5 RAP-C TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 Km3 -KM 100.00% 0.10 0.00 17/12/2021 23/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.146 04.01.01.01.09 S5 RAP-C RELLENO CON MATERIAL 2B DE PRESTAMO m3 100.00% 0.10 0.00 17/12/2021 23/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.147 04.01.01.01.10 S5 RAP-C RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 100.00% 0.10 0.00 17/12/2021 23/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.148 04.01.01.01.11 S5 RAP-C ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.10 0.00 17/12/2021 23/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.149 04.01.01.01.12 S5 RAP-C ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.10 0.00 17/12/2021 23/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
75.150 04.01.01.01.13 S5 RAP-C APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.10 0.00 17/12/2021 23/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
76 04.01.02 S5 RAP DISCIPLINA: INSTALACIONES SANITARIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
77 04.01.02.01 S5 RAP TUBERIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
7
102 04.01.02.01.04 S5 RAP 975-DWU-1"-M1E0HU-100014 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
103 04.01.02.01.04.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø1" m 0.00% 10.00 01/01/2022 07/01/2022 7.00 7.00 1.43 10.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 1.4286 1.4286 1.4286 1.4286 1.4286 1.4286 8.57 54.94898 0.86 1.4286 0 0 0 0 0 0 1.4286 9.15816327 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
104 04.01.02.01.04.02 S5 RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø1" pza 0.00% 1.00 01/01/2022 01/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 1 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
105 04.01.02.01.04.03 S5 RAP Te, PE, PE D3350 ø1" und 0.00% 1.00 01/01/2022 01/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 1 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
106 04.01.02.01.04.04 S5 RAP El, 90Deg, PE, PE D3350 ø1" und 0.00% 7.00 01/01/2022 01/01/2022 1.00 1.00 7.00 7.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 7 0 0 0 0 0 7 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
107 04.01.02.01.04.05 S5 RAP FlgAdt, PE D3350, PE., ø1" und 0.00% 4.00 01/01/2022 01/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 4 0 0 0 0 0 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
108 04.01.02.01.04.06 S5 RAP FlgBkg, A536, CL 150,FF., ø1" und 0.00% 4.00 01/01/2022 01/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 4 0 0 0 0 0 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
109 04.01.02.01.04.07 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø1" und 0.00% 1.00 01/01/2022 01/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 1 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
110 04.01.02.01.04.08 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 32.00 01/01/2022 01/01/2022 1.00 1.00 32.00 32.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 32 0 0 0 0 0 32 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
111 04.01.02.01.05 S5 RAP 975-DW-1"-G1E0V-100015 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
112 04.01.02.01.05.01 S5 RAP Pipe, A53-B-S, SMLS, Sch 80, T&C ø1" m 0.00% 3.00 01/01/2022 07/01/2022 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 2.57 9.6 0.87 0.4286 0 0 0 0 0 0 0.4286 1.6 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
113 04.01.02.01.05.02 S5 RAP El, 90Deg, FNPT, A197, CL300 ø1" und 0.00% 1.00 01/01/2022 01/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 1 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
114 04.01.02.01.05.03 S5 RAP FlgThd. A105. CL150. FF. StdF. B16.5. ø1" und 0.00% 1.00 01/01/2022 01/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 1 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
115 04.01.02.01.06 S5 RAP 975-DW-1"-G1E0V-100016 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
116 04.01.02.01.06.01 S5 RAP Pipe, A53-B-S, SMLS, Sch 80, T&C ø1" m 0.00% 3.00 01/01/2022 07/01/2022 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 2.57 42.857143 0.86 0.4286 0 0 0 0 0 0 0.4286 7.14285714 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
117 04.01.02.01.06.02 S5 RAP Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO ø1" pza 0.00% 2.00 01/01/2022 01/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 2 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
118 04.01.02.01.06.03 S5 RAP Te, FNPT. A197, CL300, ø1" und 0.00% 1.00 01/01/2022 01/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 1 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
119 04.01.02.01.06.04 S5 RAP El, 90Deg, FNPT, A197, CL300 ø1" und 0.00% 3.00 01/01/2022 01/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 3 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
120 04.01.02.01.06.05 S5 RAP FlgThd. A105. CL150. FF. StdF. B16.5. ø1" und 0.00% 2.00 01/01/2022 01/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 2 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
121 04.01.02.01.06.06 S5 RAP Nipple, TBEM, A106-B, XS, 3in., ø1" und 0.00% 4.00 01/01/2022 01/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 4 0 0 0 0 0 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
122 04.01.02.01.07 S5 RAP 975-DWU-1"-M1E0HU-100017 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
123 04.01.02.01.07.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø1" m 30.00% 18.20 01/01/2022 07/01/2022 7.00 7.00 2.60 18.20 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 2.6 2.6 2.6 2.6 2.6 2.6 15.6 24.3 0.59 2.6 0 0 0 0 0 0 2.6 4.05 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
124 04.01.02.01.07.02 S5 RAP Te, PE, PE D3350 ø1" und 0.00% 2.00 01/01/2022 01/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 2 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
125 04.01.02.01.07.03 S5 RAP RedCon, PE, PE D3350 ø1" a ø3/4" und 0.00% 2.00 01/01/2022 01/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 2 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
126 04.01.02.01.08 S5 RAP 975-DWU-3/4"-M1E0HU-100018 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
127 04.01.02.01.08.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 30.00% 13.30 01/01/2022 07/01/2022 7.00 7.00 1.90 13.30 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 1.9 1.9 1.9 1.9 1.9 1.9 11.4 19.8 0.6 1.9 0 0 0 0 0 0 1.9 3.3 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
128 04.01.02.01.08.02 S5 RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 1.00 01/01/2022 01/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 1 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
129 04.01.02.01.08.03 S5 RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 3.00 01/01/2022 01/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 3 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
130 04.01.02.01.08.04 S5 RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 3.00 01/01/2022 01/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 3 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
131 04.01.02.01.08.05 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 3.00 01/01/2022 01/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 3 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
132 04.01.02.01.08.06 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 24.00 01/01/2022 01/01/2022 1.00 1.00 24.00 24.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 24 0 0 0 0 0 24 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
133 04.01.02.01.09 S5 RAP 975-DW-3/4"-G1E0V-100019 / 100027 / 100029 / 100035 / 100039 / 100042 / 100072 & 100085 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
134 04.01.02.01.09.01 S5 RAP Pipe, A53-B-S, SMLS, Sch 80, T&C ø3/4" m 0.00% 12.00 01/01/2022 21/01/2022 21.00 21.00 0.57 12.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0.5714 0.5714 0.5714 0.5714 0.5714 0.5714 3.43 62.782313 0.29 0.5714 0.5714 0.5714 0.5714 0.5714 0.5714 0.5714 4 73.2460317 0.33 0.5714 0.5714 0.5714 0.5714 0.5714 0.5714 0.5714 4 73.24603 0.33 0.5714 0 0 0 0 0 0 0.57 10.46372 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
135 04.01.02.01.09.02 S5 RAP Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO ø3/4" pza 0.00% 8.00 01/01/2022 01/01/2022 1.00 1.00 8.00 8.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 8 0 0 0 0 0 8 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
136 04.01.02.01.09.03 S5 RAP El, 90Deg, FNPT, A197, CL300 ø3/4" und 0.00% 24.00 01/01/2022 01/01/2022 1.00 1.00 24.00 24.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 24 0 0 0 0 0 24 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
137 04.01.02.01.09.04 S5 RAP Nipple, TBEM, A106-B, XS, 7in ø3/4" und 0.00% 8.00 01/01/2022 01/01/2022 1.00 1.00 8.00 8.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 8 0 0 0 0 0 8 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
138 04.01.02.01.09.05 S5 RAP Nipple, TBEM, A106-B, XS, 3in., ø3/4" und 0.00% 8.00 01/01/2022 01/01/2022 1.00 1.00 8.00 8.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 8 0 0 0 0 0 8 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
139 04.01.02.01.09.06 S5 RAP FlgThd. A105. CL150. FF. StdF. B16.5. ø3/4" und 0.00% 24.00 01/01/2022 01/01/2022 1.00 1.00 24.00 24.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 24 0 0 0 0 0 24 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
140 04.01.02.01.09.07 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 8.00 01/01/2022 01/01/2022 1.00 1.00 8.00 8.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 8 0 0 0 0 0 8 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
141 04.01.02.01.09.08 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 64.00 01/01/2022 01/01/2022 1.00 1.00 64.00 64.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 64 0 0 0 0 0 64 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
142 04.01.02.01.09.09 S5 RAP BanjoLevaAdt. MaleThread. STAINLESS STEEL, 150PSI., ø3/4" und 0.00% 8.00 01/01/2022 01/01/2022 1.00 1.00 8.00 8.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 8 0 0 0 0 0 8 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
143 04.01.02.01.10 S5 RAP 975-DWU-3/4"-M1E0HU-100025 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
144 04.01.02.01.10.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 30.00% 39.20 08/01/2022 14/01/2022 7.00 7.00 5.60 39.20 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.6 5.6 5.6 5.6 5.6 5.6 33.6 29.8 0.6 5.6 0 0 0 0 0 0 5.6 4.966667 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
145 04.01.02.01.10.02 S5 RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 1.00 08/01/2022 08/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 1 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
146 04.01.02.01.10.03 S5 RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 3.00 08/01/2022 08/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 3 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
147 04.01.02.01.10.04 S5 RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 3.00 08/01/2022 08/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 3 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
148 04.01.02.01.10.05 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 3.00 08/01/2022 08/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 3 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
149 04.01.02.01.10.06 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 24.00 08/01/2022 08/01/2022 1.00 1.00 24.00 24.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 24 0 0 0 0 0 24 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
150 04.01.02.01.11 S5 RAP 975-DWU-3/4"-M1E0HU-100026 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
151 04.01.02.01.11.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 0.00% 2.00 08/01/2022 14/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2857 0.2857 0.2857 0.2857 0.2857 0.2857 1.7143 28.2 0.85 0.2857 0 0 0 0 0 0 0.29 4.7 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
152 04.01.02.01.11.02 S5 RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 1.00 08/01/2022 08/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 1 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
153 04.01.02.01.11.03 S5 RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 3.00 08/01/2022 08/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 3 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
154 04.01.02.01.11.04 S5 RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 3.00 08/01/2022 08/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 3 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
155 04.01.02.01.11.05 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 3.00 08/01/2022 08/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 3 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
156 04.01.02.01.11.06 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 24.00 08/01/2022 08/01/2022 1.00 1.00 24.00 24.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 24 0 0 0 0 0 24 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
157 04.01.02.01.12 S5 RAP 975-DWU-2"-M1E0HU-100033 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
158 04.01.02.01.12.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø2" m 90.00% 11.60 15/01/2022 21/01/2022 7.00 7.00 1.66 11.60 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.6571 1.6571 1.6571 1.6571 1.6571 1.6571 9.94 12.47143 0.09 1.6571 0 0 0 0 0 0 1.66 2.078571 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
159 04.01.02.01.12.02 S5 RAP Te, PE, PE D3550 ø2" und 0.00% 5.00 15/01/2022 15/01/2022 1.00 1.00 5.00 5.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 5 0 0 0 0 0 5 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
160 04.01.02.01.12.03 S5 RAP El, 90Deg, PE, PE D3350 ø2" und 0.00% 2.00 15/01/2022 15/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 2 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
161 04.01.02.01.12.04 S5 RAP RedCon, PE, PE D3350 ø2" a ø1 1/4" und 0.00% 2.00 15/01/2022 15/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 2 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
162 04.01.02.01.12.05 S5 RAP RedCon, PE, PE D3350 ø2" a ø1" und 0.00% 2.00 15/01/2022 15/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 2 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
163 04.01.02.01.12.06 S5 RAP RedCon, PE, PE D3350 ø2" a ø 3/4" und 0.00% 2.00 15/01/2022 15/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 2 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
164 04.01.02.01.12.07 S5 RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø2" pza 0.00% 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 1 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
165 04.01.02.01.12.08 S5 RAP FlgAdt, PE D3350, PE., ø2" und 0.00% 4.00 15/01/2022 15/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 4 0 0 0 0 0 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
166 04.01.02.01.12.09 S5 RAP FlgBkg, A536, CL 150,FF., ø2" und 0.00% 4.00 15/01/2022 15/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 4 0 0 0 0 0 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
167 04.01.02.01.12.10 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø2" und 0.00% 4.00 15/01/2022 15/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 4 0 0 0 0 0 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
168 04.01.02.01.12.11 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø3/4" pza 0.00% 32.00 15/01/2022 15/01/2022 1.00 1.00 32.00 32.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 32 0 0 0 0 0 32 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
169 04.01.02.01.13 S5 RAP 975-DWU-3/4"-M1E0HU-100034 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
170 04.01.02.01.13.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 85.71% 0.43 15/01/2022 21/01/2022 7.00 7.00 0.06 0.43 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0614 0.0614 0.0614 0.0614 0.0614 0.0614 0.37 3.60381 0.12 0.0614 0 0 0 0 0 0 0.06 0.600635 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
171 04.01.02.01.13.02 S5 RAP El, 90Deg, PE, PE D3350 ø3/4" und 0.00% 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 1 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
172 04.01.02.01.13.03 S5 RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 1 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
173 04.01.02.01.13.04 S5 RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 3.00 15/01/2022 15/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 3 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
174 04.01.02.01.13.05 S5 RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 3.00 15/01/2022 15/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 3 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
175 04.01.02.01.13.06 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 3.00 15/01/2022 15/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 3 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
176 04.01.02.01.13.07 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 24.00 15/01/2022 15/01/2022 1.00 1.00 24.00 24.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 24 0 0 0 0 0 24 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
177 04.01.02.01.14 S5 RAP 975-DWU-1"-M1E0HU-100037 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
178 04.01.02.01.14.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø1" m 30.00% 31.50 03/01/2022 09/01/2022 7.00 7.00 4.50 31.50 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.5 4.5 4.5 4.5 18 34.8 0.4 4.5 4.5 4.5 0 0 0 0 13.5 26.1 0.3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
179 04.01.02.01.14.02 S5 RAP Te, PE, PE D3350 ø1" und 0.00% 2.00 03/01/2022 03/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 2 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
180 04.01.02.01.14.03 S5 RAP El, 90Deg, PE, PE D3350 ø1" und 0.00% 1.00 03/01/2022 03/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 1 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
181 04.01.02.01.14.04 S5 RAP RedCon, PE, PE D3350 ø1" a ø3/4" und 0.00% 3.00 03/01/2022 03/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 3 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
182 04.01.02.01.14.05 S5 RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø1" pza 0.00% 1.00 03/01/2022 03/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 1 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
183 04.01.02.01.14.06 S5 RAP FlgAdt, PE D3350, PE., ø1" und 0.00% 2.00 03/01/2022 03/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 2 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
184 04.01.02.01.14.07 S5 RAP FlgBkg, A536, CL 150,FF., ø1" und 0.00% 2.00 03/01/2022 03/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 2 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
185 04.01.02.01.14.08 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø1" und 0.00% 2.00 03/01/2022 03/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 2 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
186 04.01.02.01.14.09 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 16.00 03/01/2022 03/01/2022 1.00 1.00 16.00 16.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 16 0 0 0 16 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
187 04.01.02.01.15 S5 RAP 975-DWU-3/4"-M1E0HU-100038 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
188 04.01.02.01.15.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 30.00% 19.60 03/01/2022 09/01/2022 7.00 7.00 2.80 19.60 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.8 2.8 2.8 2.8 11.2 18 0.4 2.8 2.8 2.8 0 0 0 0 8.4 13.5 0.3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
189 04.01.02.01.15.02 S5 RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 1.00 03/01/2022 03/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 1 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
190 04.01.02.01.15.03 S5 RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 3.00 03/01/2022 03/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 3 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
191 04.01.02.01.15.04 S5 RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 3.00 03/01/2022 03/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 3 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
192 04.01.02.01.15.05 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 3.00 03/01/2022 03/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 3 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
193 04.01.02.01.15.06 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 24.00 03/01/2022 03/01/2022 1.00 1.00 24.00 24.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 24 0 0 0 24 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
194 04.01.02.01.16 S5 RAP 975-DWU-3/4"-M1E0HU-100041 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
195 04.01.02.01.16.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 0.00% 3.00 03/01/2022 09/01/2022 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4286 0.4286 0.4286 0.4286 1.71 18.857143 0.57 0.4286 0.4286 0.4286 0 0 0 0 1.2857 14.1428571 0.43 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
196 04.01.02.01.16.02 S5 RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 1.00 03/01/2022 03/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 1 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
197 04.01.02.01.16.03 S5 RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 3.00 03/01/2022 03/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 3 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
198 04.01.02.01.16.04 S5 RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 3.00 03/01/2022 03/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 3 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
199 04.01.02.01.16.05 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 3.00 03/01/2022 03/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 3 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
200 04.01.02.01.16.06 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 24.00 03/01/2022 03/01/2022 1.00 1.00 24.00 24.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 24 0 0 0 24 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
201 04.01.02.01.17 S5 RAP 975-DWU-3/4"-M1E0HU-100044 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
202 04.01.02.01.17.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 30.00% 13.30 06/01/2022 12/01/2022 7.00 7.00 1.90 13.30 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.9 1.9 8.41 0.1 1.9 1.9 1.9 1.9 1.9 1.9 0 11.4 50.46 0.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
203 04.01.02.01.17.02 S5 RAP Te, PE, PE D3350 ø3/4" und 0.00% 2.00 06/01/2022 06/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 2 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
204 04.01.02.01.17.03 S5 RAP El, 90Deg, PE, PE D3350 ø3/4" und 0.00% 3.00 06/01/2022 06/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 3 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
205 04.01.02.01.17.04 S5 RAP RedCon, PE, PE D3350 ø3/4" a ø 1/2" und 0.00% 1.00 06/01/2022 06/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 1 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
206 04.01.02.01.17.05 S5 RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 1.00 06/01/2022 06/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 1 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
207 04.01.02.01.17.06 S5 RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 4.00 06/01/2022 06/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 4 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
208 04.01.02.01.17.07 S5 RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 4.00 06/01/2022 06/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 4 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
209 04.01.02.01.17.08 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 4.00 06/01/2022 06/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 4 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
210 04.01.02.01.17.09 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 32.00 06/01/2022 06/01/2022 1.00 1.00 32.00 32.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 32 32 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
211 04.01.02.01.18 S5 RAP 975-DW-3/4"-G1E0V-100045 / 975-DW-3/4"-G1E0V-100046 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
212 04.01.02.01.18.01 S5 RAP Pipe, A53-B-S, SMLS, Sch 80, T&C ø3/4" m 0.00% 2.00 06/01/2022 12/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2857 0.29 9 0.14 0.2857 0.2857 0.2857 0.2857 0.2857 0.2857 0 1.7143 54 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
213 04.01.02.01.18.02 S5 RAP Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO,ø3/4" pza 0.00% 2.00 06/01/2022 06/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 2 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
214 04.01.02.01.18.03 S5 RAP El, 90Deg, FNPT, A197, CL300, ø3/4" und 0.00% 4.00 06/01/2022 06/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 4 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
215 04.01.02.01.18.04 S5 RAP Nipple, TBEM, A106-B, XS, 7in ø3/4" und 0.00% 2.00 06/01/2022 06/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 2 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
216 04.01.02.01.18.05 S5 RAP Nipple, TBEM, A106-B, XS, 3in., ø3/4" und 0.00% 2.00 06/01/2022 06/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 2 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
217 04.01.02.01.18.06 S5 RAP FlgThd. A105. CL150. FF. StdF. B16.5. ø3/4" und 0.00% 6.00 06/01/2022 06/01/2022 1.00 1.00 6.00 6.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 6 6 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
218 04.01.02.01.18.07 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 2.00 06/01/2022 06/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 2 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
219 04.01.02.01.18.08 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 16.00 06/01/2022 06/01/2022 1.00 1.00 16.00 16.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 16 16 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
220 04.01.02.01.18.09 S5 RAP BanjoLevaAdt. MaleThread. STAINLESS STEEL, 150PSI., ø3/4" und 0.00% 2.00 06/01/2022 06/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 2 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
221 04.01.02.01.19 S5 RAP 975-DWU-1/2"-M1E0HU-100049 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
222 04.01.02.01.19.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 0.00% 14.00 06/01/2022 12/01/2022 7.00 7.00 2.00 14.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 6.9 0.14 2 2 2 2 2 2 0 12 41.4 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
223 04.01.02.01.19.02 S5 RAP Te, PE, PE D3350 ø3/4" und 0.00% 1.00 06/01/2022 06/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 1 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
224 04.01.02.01.19.03 S5 RAP El, 90Deg, PE, PE D3350 ø3/4" und 0.00% 3.00 06/01/2022 06/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 3 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
225 04.01.02.01.19.04 S5 RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 2.00 06/01/2022 06/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 2 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
226 04.01.02.01.19.05 S5 RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 2.00 06/01/2022 06/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 2 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
227 04.01.02.01.19.06 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 2.00 06/01/2022 06/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 2 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
228 04.01.02.01.19.07 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 16.00 06/01/2022 06/01/2022 1.00 1.00 16.00 16.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 16 16 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
229 04.01.02.01.20 S5 RAP 975-DW-1/2"-G1E0V-100050 / 975-DW-1/2"-G1E0V-100053 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
230 04.01.02.01.20.01 S5 RAP Pipe, A53-B-S, SMLS, StdWt, T&C,ø1/2" m 0.00% 2.00 07/01/2022 13/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2857 0.2857 0.2857 0.2857 0.2857 0.2857 0.2857 2 63.0952381 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
231 04.01.02.01.20.02 S5 RAP Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO,ø1/2" pza 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
232 04.01.02.01.20.03 S5 RAP El, 90Deg, FNPT, A197, CL300, ø1/2" und 0.00% 4.00 07/01/2022 07/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 4 0 0 0 0 0 0 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
233 04.01.02.01.20.04 S5 RAP Nipple, TBEM, A106-B, XS, 7in., ø1/2" und 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
234 04.01.02.01.20.05 S5 RAP Nipple, TBEM, A106-B, XS, 3in., ø1/2" und 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
235 04.01.02.01.20.06 S5 RAP FlgThd. A105. CL150. FF. StdF. B16.5., ø1/2" und 0.00% 6.00 07/01/2022 07/01/2022 1.00 1.00 6.00 6.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 6 0 0 0 0 0 0 6 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
236 04.01.02.01.20.07 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
237 04.01.02.01.20.08 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 16.00 07/01/2022 07/01/2022 1.00 1.00 16.00 16.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 16 0 0 0 0 0 0 16 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
238 04.01.02.01.20.09 S5 RAP BanjoLevaAdt. MaleThread. STAINLESS STEEL, 150PSI., ø1/2" und 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
239 04.01.02.01.21 S5 RAP 975-DWU-1 1/4"-M1E0HU-100065 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
240 04.01.02.01.21.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø1 1/4" m 0.00% 7.00 07/01/2022 27/01/2022 21.00 21.00 0.33 7.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3333 0.3333 0.3333 0.3333 0.3333 0.3333 0.3333 2.3333 21.2666667 0.33 0.3333 0.3333 0.3333 0.3333 0.3333 0.3333 0.3333 2.33 21.26667 0.33 0.3333 0.3333 0.3333 0.3333 0.3333 0.3333 0.3333 2.33 21.26667 0.33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
241 04.01.02.01.21.02 S5 RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø1 1/4 pza 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
242 04.01.02.01.21.03 S5 RAP Te, PE, PE D3350 ø1 1/4" und 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
243 04.01.02.01.21.04 S5 RAP El, 90Deg, PE, PE D3350, ø1 1/4" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
244 04.01.02.01.21.05 S5 RAP FlgAdt, PE D3350, PE., ø1 1/4" und 0.00% 4.00 07/01/2022 07/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 4 0 0 0 0 0 0 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
245 04.01.02.01.21.06 S5 RAP FlgBkg, A536, CL 150,FF., ø1 1/4" und 0.00% 4.00 07/01/2022 07/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 4 0 0 0 0 0 0 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
246 04.01.02.01.21.07 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø1 1/4" und 0.00% 4.00 07/01/2022 07/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 4 0 0 0 0 0 0 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
247 04.01.02.01.21.08 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 32.00 07/01/2022 07/01/2022 1.00 1.00 32.00 32.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 32 0 0 0 0 0 0 32 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
248 04.01.02.01.22 S5 RAP 975-DW-1 1/4"-G1E0V-100066 / 975-DW-1 1/4"-G1E0V-100068 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
249 04.01.02.01.22.01 S5 RAP Pipe, A53-B-S, SMLS, StdWt, T&C,ø1 1/4" m 0.00% 1.00 07/01/2022 27/01/2022 21.00 21.00 0.05 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.3333 21.7365079 0.33 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.33 21.73651 0.33 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.33 21.73651 0.33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
250 04.01.02.01.22.02 S5 RAP Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO,ø1 1/4" pza 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
251 04.01.02.01.22.03 S5 RAP El, 90Deg, FNPT, A197, CL300, ø1 1/4" und 0.00% 4.00 07/01/2022 07/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 4 0 0 0 0 0 0 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
252 04.01.02.01.22.04 S5 RAP Nipple, TBEM, A106-B, XS, 7in., ø1 1/4" und 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
253 04.01.02.01.22.05 S5 RAP Nipple, TBEM, A106-B, XS, 3in., ø1 1/4" und 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
254 04.01.02.01.22.06 S5 RAP FlgThd. A105. CL150. FF. StdF. B16.5., ø1 1/4" und 0.00% 6.00 07/01/2022 07/01/2022 1.00 1.00 6.00 6.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 6 0 0 0 0 0 0 6 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
255 04.01.02.01.22.07 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø1 1/4" und 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
256 04.01.02.01.22.08 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 16.00 07/01/2022 07/01/2022 1.00 1.00 16.00 16.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 16 0 0 0 0 0 0 16 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
257 04.01.02.01.22.09 S5 RAP BanjoLevaAdt. MaleThread. STAINLESS STEEL, 150PSI., ø1 1/4" und 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
258 04.01.02.01.23 S5 RAP 975-DWU-3/4"-M1E0HU-100071 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
259 04.01.02.01.23.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 0.00% 3.00 07/01/2022 27/01/2022 21.00 21.00 0.14 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 10.3333333 0.33 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 10.33333 0.33 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 10.33333 0.33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
260 04.01.02.01.23.02 S5 RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø3/4" pza 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
261 04.01.02.01.23.03 S5 RAP FlgAdt, PE D3350, PE., ø3/4" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
262 04.01.02.01.23.04 S5 RAP FlgBkg, A536, CL 150,FF., ø3/4" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
263 04.01.02.01.23.05 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
264 04.01.02.01.23.06 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 24.00 07/01/2022 07/01/2022 1.00 1.00 24.00 24.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 24 0 0 0 0 0 0 24 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
265 04.01.02.01.24 S5 RAP 975-DWU-1 1/4"-M1E0HU-100080 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
266 04.01.02.01.24.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø1 1/4" m 0.00% 2.00 07/01/2022 27/01/2022 21.00 21.00 0.10 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0952 0.0952 0.0952 0.0952 0.0952 0.0952 0.0952 0.6667 11.0555556 0.34 0.0952 0.0952 0.0952 0.0952 0.0952 0.0952 0.0952 0.67 11.05556 0.34 0.0952 0.0952 0.0952 0.0952 0.0952 0.0952 0.0952 0.67 11.05556 0.34 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
267 04.01.02.01.24.02 S5 RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø1 1/4 pza 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
268 04.01.02.01.24.03 S5 RAP FlgAdt, PE D3350, PE., ø1 1/4" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
269 04.01.02.01.24.04 S5 RAP FlgBkg, A536, CL 150,FF., ø1 1/4" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
270 04.01.02.01.24.05 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø1 1/4" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
271 04.01.02.01.24.06 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 24.00 07/01/2022 07/01/2022 1.00 1.00 24.00 24.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 24 0 0 0 0 0 0 24 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
272 04.01.02.01.25 S5 RAP 975-DW-1 1/4"-G1E0V-100081 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
273 04.01.02.01.25.01 S5 RAP Pipe, A53-B-S, SMLS, StdWt, T&C,ø1 1/4" m 0.00% 2.00 07/01/2022 27/01/2022 21.00 21.00 0.10 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0952 0.0952 0.0952 0.0952 0.0952 0.0952 0.0952 0.6667 6.56666667 0.33 0.0952 0.0952 0.0952 0.0952 0.0952 0.0952 0.0952 0.67 6.566667 0.33 0.0952 0.0952 0.0952 0.0952 0.0952 0.0952 0.0952 0.67 6.566667 0.33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
274 04.01.02.01.25.02 S5 RAP El, 90Deg, FNPT, A197, CL300, ø1 1/4" und 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
275 04.01.02.01.25.03 S5 RAP FlgThd. A105. CL150. FF. StdF. B16.5., ø1 1/4" und 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
276 04.01.02.01.25.04 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø1 1/4" und 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
277 04.01.02.01.25.05 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 8.00 07/01/2022 07/01/2022 1.00 1.00 8.00 8.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 8 0 0 0 0 0 0 8 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
278 04.01.02.01.26 S5 RAP 975-DWU-1"-M1E0HU-100083 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
279 04.01.02.01.26.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø1" m 30.00% 21.00 07/01/2022 13/01/2022 7.00 7.00 3.00 21.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3 3 3 3 3 3 21 51.94 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
280 04.01.02.01.26.02 S5 RAP Te, PE, PE D3350 ø1" und 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
281 04.01.02.01.26.03 S5 RAP El, 90Deg, PE, PE D3350 ø1" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
282 04.01.02.01.26.04 S5 RAP RedCon, PE, PE D3350 ø1" a ø3/4" und 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
283 04.01.02.01.26.05 S5 RAP Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø1" pza 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
284 04.01.02.01.26.06 S5 RAP FlgAdt, PE D3350, PE., ø1" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
285 04.01.02.01.26.07 S5 RAP FlgBkg, A536, CL 150,FF., ø1" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
286 04.01.02.01.26.08 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø1" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
287 04.01.02.01.26.09 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 24.00 07/01/2022 07/01/2022 1.00 1.00 24.00 24.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 24 0 0 0 0 0 0 24 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
288 04.01.02.01.27 S5 RAP 975-DWU-3/4"-M1E0HU-100084 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
289 04.01.02.01.27.01 S5 RAP Pipe. PE D3350, PE, SDR 11 ø3/4" m 0.00% 3.00 14/01/2022 20/01/2022 7.00 7.00 0.43
293 04.01.02.01.27.05 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 3.00 14/01/2022 14/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
294 04.01.02.01.27.06 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 24.00 14/01/2022 14/01/2022 1.00 1.00 24.00 24.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 24 0 0 0 0 0 0 24 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
295 04.01.02.01.28 S5 RAP 975-DW-1"-G1E0V-100087 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
296 04.01.02.01.28.01 S5 RAP Pipe, A53-B-S, SMLS, StdWt, T&C,ø1/2" m 0.00% 1.00 14/01/2022 20/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 34 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
297 04.01.02.01.28.02 S5 RAP Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO,ø1/2" pza 0.00% 1.00 14/01/2022 14/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
298 04.01.02.01.28.03 S5 RAP El, 90Deg, FNPT, A197, CL300, ø1/2" und 0.00% 2.00 14/01/2022 14/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
299 04.01.02.01.28.04 S5 RAP Nipple, TBEM, A106-B, XS, 7in., ø1/2" und 0.00% 1.00 14/01/2022 14/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
300 04.01.02.01.28.05 S5 RAP Nipple, TBEM, A106-B, XS, 3in., ø1/2" und 0.00% 1.00 14/01/2022 14/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
301 04.01.02.01.28.06 S5 RAP FlgThd. A105. CL150. FF. StdF. B16.5., ø1/2" und 0.00% 3.00 14/01/2022 14/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
302 04.01.02.01.28.07 S5 RAP Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø3/4" und 0.00% 1.00 14/01/2022 14/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
303 04.01.02.01.28.08 S5 RAP StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø1/2" pza 0.00% 8.00 14/01/2022 14/01/2022 1.00 1.00 8.00 8.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 8 0 0 0 0 0 0 8 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
304 04.01.02.01.28.09 S5 RAP BanjoLevaAdt. MaleThread. STAINLESS STEEL, 150PSI., ø1/2" und 0.00% 1.00 14/01/2022 14/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
305 04.01.02.01.29 S5 RAP MODIFICACIONES EN LA LÍNEA DE AGUA POTABLE EXISTENTE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
306 04.01.02.01.29.01 S5 RAP Pipe, PE D3350, PE, SDR 11 ø8" m 0.00% 200.00 14/01/2022 03/02/2022 21.00 21.00 9.52 200.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9.5238 9.5238 9.5238 9.5238 9.5238 9.5238 9.5238 66.7 50.83333 0.33 9.5238 9.5238 9.5238 9.5238 9.5238 9.5238 9.5238 66.7 50.83333 0.33 9.5238 9.5238 9.5238 9.5238 9.5238 9.5238 9.5238 66.7 50.833333 0.33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
307 04.01.02.02 S5 RAP SOPORTERIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
308 04.01.02.02.01 S5 RAP GA-GS6-1", Tubería 975-DW-1"-G1E0V-100015 & 100016 pza 0.00% 4.00 04/02/2022 10/02/2022 7.00 7.00 0.57 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5714 0.5714 0.5714 0.5714 0.5714 0.5714 0.5714 4 255 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
309 04.01.02.02.02 S5 RAP GA-GS6-1/2", Tubería 975-DW-3/4"-G1E0V-100045 / 100046 / 100050 / 1000 pza 0.00% 5.00 04/02/2022 10/02/2022 7.00 7.00 0.71 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7143 0.7143 0.7143 0.7143 0.7143 0.7143 0.7143 5 255 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
310 04.01.02.03 S5 RAP PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
311 04.01.02.03.01 S5 RAP PINTURA DE TUBERIAS m2 0.00% 3.00 04/02/2022 10/02/2022 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 3 47.2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
312 04.02 S5 RAN RED DE AGUAS NEGRAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
313 04.02.01 S5 RAN DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
314 04.02.01.01 S5 RAN MOVIMIENTO DE TIERRAS PARA TUBERÍAS, BUZONES - RED DE AGUAS NEGRAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
315 04.02.01.01.01 S5 RAN EXCAVACION PARA BUZONES m3 88.89% 1.00 31/12/2021 09/01/2022 10.00 10.00 0.10 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.7 1.0675 0.08 0.1 0.1 0.1 0 0 0 0 0.3 0.4575 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
316 04.02.01.01.02 S5 RAN EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 97.78% 3.65 31/12/2021 11/01/2022 12.00 12.00 0.30 3.65 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.3042 0.3042 0.3042 0.3042 0.3042 0.3042 0.3042 2.13 3.0923611 0.01 0.3042 0.3042 0.3042 0.3042 0.3042 0 0 1.5208 2.20882937 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
317 04.02.01.01.03 S5 RAN EXCAVACION PARA CAJAS DE REGISTRO m3 73.98% 0.52 31/12/2021 11/01/2022 12.00 12.00 0.04 0.52 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0433 0.0433 0.0433 0.0433 0.0433 0.0433 0.0433 0.3 1.8806667 0.16 0.0433 0.0433 0.0433 0.0433 0.0433 0 0 0.2167 1.34333333 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
318 04.02.01.01.04 S5 RAN REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 83.13% 98.38 31/12/2021 11/01/2022 12.00 12.00 8.20 98.38 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 8.1983 8.1983 8.1983 8.1983 8.1983 8.1983 8.1983 57.4 7.3170125 0.1 8.1983 8.1983 8.1983 8.1983 8.1983 0 0 40.992 5.2264375 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
319 04.02.01.01.05 S5 RAN TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= m3 -KM 83.42% 3.32 31/12/2021 11/01/2022 12.00 12.00 0.28 3.32 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.2767 0.2767 0.2767 0.2767 0.2767 0.2767 0.2767 1.94 0.3001833 0.1 0.2767 0.2767 0.2767 0.2767 0.2767 0 0 1.3833 0.21441667 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
320 04.02.01.01.06 S5 RAN TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM
m3 -KM 76.04% 27.32 31/12/2021 11/01/2022 12.00 12.00 2.28 27.32 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 2.2767 2.2767 2.2767 2.2767 2.2767 2.2767 2.2767 15.9 0.5843444 0.15 2.2767 2.2767 2.2767 2.2767 2.2767 0 0 11.383 0.41738889 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
321 04.02.01.01.07 S5 RAN COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 70.26% 4.76 31/12/2021 12/01/2022 13.00 13.00 0.37 4.76 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.3662 0.3662 0.3662 0.3662 0.3662 0.3662 0.3662 2.56 8.7571795 0.16 0.3662 0.3662 0.3662 0.3662 0.3662 0.3662 0 2.1969 7.50615385 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
322 04.02.01.01.08 S5 RAN TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 72.60% 23.57 31/12/2021 13/01/2022 14.00 14.00 1.68 23.57 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 1.6836 1.6836 1.6836 1.6836 1.6836 1.6836 1.6836 11.8 1.826675 0.14 1.6836 1.6836 1.6836 1.6836 1.6836 1.6836 1.6836 11.785 1.826675 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
323 04.02.01.01.09 S5 RAN TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 Km3 -KM 70.81% 145.06 31/12/2021 14/01/2022 15.00 15.00 9.67 145.06 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 9.6707 9.6707 9.6707 9.6707 9.6707 9.6707 9.6707 67.7 2.4821378 0.14 9.6707 9.6707 9.6707 9.6707 9.6707 9.6707 9.6707 67.695 2.48213778 0.14 9.6707 0 0 0 0 0 0 9.67 0.354591 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
324 04.02.01.01.10 S5 RAN RELLENO CON MATERIAL 2B DE PRESTAMO m3 90.52% 6.26 31/12/2021 15/01/2022 16.00 16.00 0.39 6.26 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.3913 0.3913 0.3913 0.3913 0.3913 0.3913 0.3913 2.74 4.8612813 0.04 0.3913 0.3913 0.3913 0.3913 0.3913 0.3913 0.3913 2.7388 4.86128125 0.04 0.3913 0.3913 0 0 0 0 0 0.78 1.388938 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
325 04.02.01.01.11 S5 RAN RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 92.95% 6.13 31/12/2021 16/01/2022 17.00 17.00 0.36 6.13 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.3606 0.3606 0.3606 0.3606 0.3606 0.3606 0.3606 2.52 5.1113382 0.03 0.3606 0.3606 0.3606 0.3606 0.3606 0.3606 0.3606 2.5241 5.11133824 0.03 0.3606 0.3606 0.3606 0 0 0 0 1.08 2.190574 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
326 04.02.01.01.12 S5 RAN ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 71.64% 30.62 31/12/2021 17/01/2022 18.00 18.00 1.70 30.62 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 1.7011 1.7011 1.7011 1.7011 1.7011 1.7011 1.7011 11.9 1.3670129 0.11 1.7011 1.7011 1.7011 1.7011 1.7011 1.7011 1.7011 11.908 1.36701289 0.11 1.7011 1.7011 1.7011 1.7011 0 0 0 6.8 0.78115 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
327 04.02.01.01.13 S5 RAN ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 70.81% 62.77 31/12/2021 18/01/2022 19.00 19.00 3.30 62.77 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 3.3037 3.3037 3.3037 3.3037 3.3037 3.3037 3.3037 23.1 1.0799744 0.11 3.3037 3.3037 3.3037 3.3037 3.3037 3.3037 3.3037 23.126 1.07997437 0.11 3.3037 3.3037 3.3037 3.3037 3.3037 0 0 16.5 0.77141 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
328 04.02.01.01.14 S5 RAN APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 80.23% 21.35 31/12/2021 19/01/2022 20.00 20.00 1.07 21.35 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 1.0675 1.0675 1.0675 1.0675 1.0675 1.0675 1.0675 7.47 1.7549053 0.07 1.0675 1.0675 1.0675 1.0675 1.0675 1.0675 1.0675 7.4725 1.7549053 0.07 1.0675 1.0675 1.0675 1.0675 1.0675 1.0675 0 6.41 1.504205 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
329 04.02.01.02 S5 RAN CONCRETO SIMPLE PARA BUZONES DE AGUAS NEGRAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
330 04.02.01.02.01 S5 RAN COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 0.00% 1.00 07/01/2022 10/01/2022 4.00 4.00 0.25 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.25 0.25 0.25 0.25 0 0 0 1 6.1765 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
331 04.02.01.02.02 S5 RAN COLOCACIÓN DE CONCRETO F'c=10 MPa PARA DADO m3 0.00% 1.00 11/01/2022 14/01/2022 4.00 4.00 0.25 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.25 0.25 0.25 0.75 4.63235294 0.77 0.25 0 0 0 0 0 0 0.25 1.544118 0.26 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
332 04.02.01.03 S5 RAN CONCRETO ARMADO PARA CAJAS DE REGISTRO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
333 04.02.01.03.01 S5 RAN INSTALACION DE CAJAS DE REGISTRO DE 12"x24" und 0.00% 3.00 15/01/2022 18/01/2022 4.00 4.00 0.75 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.75 0.75 0.75 0.75 0 0 3 61.5 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
334 04.02.01.03.02 S5 RAN INSTALACION DE CAJAS DE REGISTRO DE 4" und 0.00% 1.00 15/01/2022 18/01/2022 4.00 4.00 0.25 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.25 0.25 0.25 0.25 0 0 1 20.5 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
335 04.02.01.04 S5 RAN CONCRETO ARMADO PARA BUZONES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
336 04.02.01.04.01 S5 RAN COLOCACIÓN DE CONCRETO F'c=20 MPa m3 0.00% 7.00 15/01/2022 15/01/2022 1.00 1.00 7.00 7.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 0 0 0 0 0 7 43.23529 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
337 04.02.01.04.02 S5 RAN ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 28.00 13/01/2022 13/01/2022 1.00 1.00 28.00 28.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 28 28 69.1768 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
338 04.02.01.04.03 S5 RAN SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 355.00 14/01/2022 14/01/2022 1.00 1.00 355.00 355.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 355 0 0 0 0 0 0 355 41.41667 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
339 04.02.01.05 S5 RAN CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
340 04.02.01.05.01 S5 RAN CURADO DE CONCRETO CON ANTISOL m2 0.00% 28.00 19/01/2022 21/01/2022 3.00 3.00 9.33 28.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9.3333 9.3333 18.7 2.566667 0.64 9.3333 0 0 0 0 0 0 9.33 1.283333 0.32 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
341 04.02.01.06 S5 RAN CARPINTERIA METALICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
342 04.02.01.06.01 S5 RAN SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA F°G° CON PLANCHA und 0.00% 3.00 24/01/2022 24/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 3 4.5 0.9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
343 04.02.02 S5 RAN DISCIPLINA: INSTALACIONES SANITARIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
344 04.02.02.01 S5 RAN TUBERIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
345 04.02.02.01.01 S5 RAN RED DE AGUAS NEGRAS-TUBERIA EN CISTERNA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
346 04.02.02.01.01.01 S5 RAN PIPE, PVC-D3034, BELL, SDR 35 Ø2" m 0.00% 3.00 11/01/2022 31/01/2022 21.00 21.00 0.14 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.4286 0.35714286 0.12 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 0.833333 0.28 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 0.833333 0.28 0.1429 0.1429 0.1429 0.1429 0 0 0 0.57 0.4761905 0.16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
347 04.02.02.01.02 S5 RAN 975-WSU-4"-P0E03U-10001 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
348 04.02.02.01.02.01 S5 RAN PIPE, PVC-D3034, BELL, SDR 35 Ø4" m 30.00% 44.10 11/01/2022 31/01/2022 21.00 21.00 2.10 44.10 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.1 2.1 2.1 6.3 4.9884375 0.1 2.1 2.1 2.1 2.1 2.1 2.1 2.1 14.7 11.63969 0.23 2.1 2.1 2.1 2.1 2.1 2.1 2.1 14.7 11.63969 0.23 2.1 2.1 2.1 2.1 0 0 0 8.4 6.65125 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
349 04.02.02.01.02.02 S5 RAN PIPE, PVC-D3034, BELL, SDR 35 Ø2" m 30.00% 5.60 11/01/2022 31/01/2022 21.00 21.00 0.27 5.60 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2667 0.2667 0.2667 0.8 0.55427083 0.09 0.2667 0.2667 0.2667 0.2667 0.2667 0.2667 0.2667 1.87 1.293299 0.22 0.2667 0.2667 0.2667 0.2667 0.2667 0.2667 0.2667 1.87 1.293299 0.22 0.2667 0.2667 0.2667 0.2667 0 0 0 1.07 0.7390278 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
350 04.02.02.01.02.03 S5 RAN El, 45Deg, Bell, Bell, PVC-D3034 ø4" und 30.00% 0.70 11/01/2022 11/01/2022 1.00 1.00 0.70 0.70 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.7 0 0 0.7 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
351 04.02.02.01.02.04 S5 RAN EL, 90DEG, BELL. BELL, PVC-D3034 Ø4" und 30.00% 0.70 11/01/2022 11/01/2022 1.00 1.00 0.70 0.70 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.7 0 0 0.7 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
352 04.02.02.01.02.05 S5 RAN EL, 90DEG, BELL. BELL, PVC-D3034 Ø2" und 30.00% 2.10 11/01/2022 11/01/2022 1.00 1.00 2.10 2.10 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 2.1 0 0 2.1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
353 04.02.02.01.02.06 S5 RAN RedTe, Bell, Bell, PVC-D3034 ø4" pza 30.00% 2.10 11/01/2022 11/01/2022 1.00 1.00 2.10 2.10 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 2.1 0 0 2.1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
354 04.02.02.01.03 S5 RAN 975-PWU-2"-MDEOHU-100018 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
355 04.02.02.01.03.01 S5 RAN Pipe, PE D3350, PE, SDR 15.5 ø2" m 0.00% 4.00 11/01/2022 31/01/2022 21.00 21.00 0.19 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1905 0.1905 0.1905 0.5714 1.42857143 0.14 0.1905 0.1905 0.1905 0.1905 0.1905 0.1905 0.1905 1.33 3.333333 0.33 0.1905 0.1905 0.1905 0.1905 0.1905 0.1905 0.1905 1.33 3.333333 0.33 0.1905 0.1905 0.1905 0.1905 0 0 0 0.76 1.9047619 0.19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
356 04.02.02.01.03.02 S5 RAN El, 45Deg, PE, PE D3350 ø2" und 0.00% 1.00 11/01/2022 11/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 1 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
357 04.02.02.01.04 S5 RAN 975-MDW-6"-MCE0HU-10005 / 10006 & 10007 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
358 04.02.02.01.04.01 S5 RAN Pipe, PE D3350, PE, SDR 21 ø6" m 16.79% 117.33 11/01/2022 31/01/2022 21.00 21.00 5.59 117.33 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.5871 5.5871 5.5871 16.761 7.66746201 0.12 5.5871 5.5871 5.5871 5.5871 5.5871 5.5871 5.5871 39.1 17.89074 0.28 5.5871 5.5871 5.5871 5.5871 5.5871 5.5871 5.5871 39.1 17.89074 0.28 5.5871 5.5871 5.5871 5.5871 0 0 0 22.3 10.223283 0.16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
359 04.03 S5 RAG RED DE AGUAS GRISES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
360 04.03.01 S5 RAG DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
376 04.03.01.02 S5 RAG MOVIMIENTO DE TIERRAS PARA FOSA DE RETENCIÓN DE DERRAMES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
377 04.03.01.02.01 S5 RAG EXCAVACIÓN P/ESTRUCTURAS m3 100.00% 0.00 12/11/2021 16/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
378 04.03.01.02.02 S5 RAG REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.00 12/11/2021 16/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
379 04.03.01.02.03 S5 RAG TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.00 12/11/2021 16/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
380 04.03.01.02.04 S5 RAG TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 100.00% 0.00 12/11/2021 16/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
381 04.03.01.02.05 S5 RAG MEJORAMIENTO CON MATERIAL GRANULAR m3 100.00% 0.00 12/11/2021 16/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
382 04.03.01.02.06 S5 RAG ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.00 12/11/2021 16/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
383 04.03.01.02.07 S5 RAG ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.00 12/11/2021 16/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
384 04.03.01.02.08 S5 RAG APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.00 12/11/2021 16/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
385 04.03.01.03 S5 RAG CONCRETO SIMPLE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
386 04.03.01.03.01 S5 RAG COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 75.00% 1.00 31/12/2021 28/01/2022 5.00 29.00 0.20 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0345 0.0345 0.0345 0.0345 0.0345 0.0345 0.0345 0.24 1.4908793 0.06 0.0345 0.0345 0.0345 0.0345 0.0345 0.0345 0.0345 0.2414 1.49087931 0.06 0.0345 0.0345 0.0345 0.0345 0.0345 0.0345 0.0345 0.24 1.490879 0.06 0.0345 0.0345 0.0345 0.0345 0.0345 0.0345 0.0345 0.24 1.490879 0.06 0.0345 0 0 0 0 0 0 0.03 0.2129828 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
387 04.03.01.04 S5 RAG CONCRETO ARMADO PARA CAJAS DE REGISTRO Y DESARENADOR 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
388 04.03.01.04.01 S5 RAG INSTALACION DE CAJAS 30"x30" und 75.00% 1.25 24/01/2022 28/01/2022 5.00 5.00 0.25 1.25 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.25 0.25 0.25 0.25 1 20.5 0.2 0.25 0 0 0 0 0 0 0.25 5.125 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
389 04.03.01.04.02 S5 RAG INSTALACION DE CAJAS 20"x20" und 75.00% 1.50 24/01/2022 28/01/2022 5.00 5.00 0.30 1.50 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3 0.3 0.3 0.3 1.2 24.6 0.2 0.3 0 0 0 0 0 0 0.3 6.15 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
390 04.03.01.04.03 S5 RAG INSTALACION DE CAJA 12"x24" und 75.00% 0.75 24/01/2022 28/01/2022 5.00 5.00 0.15 0.75 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.15 0.15 0.15 0.15 0.6 12.3 0.2 0.15 0 0 0 0 0 0 0.15 3.075 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
391 04.03.01.04.04 S5 RAG INSTALACION DE DESARENADOR 1m x 1m und 75.00% 0.25 24/01/2022 28/01/2022 5.00 5.00 0.05 0.25 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.05 0.05 0.05 0.05 0.2 4.1 0.2 0.05 0 0 0 0 0 0 0.05 1.025 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
392 04.03.01.05 S5 RAG CONCRETO ARMADO PARA BUZONES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
393 04.03.01.05.01 S5 RAG COLOCACIÓN DE CONCRETO F'c=20 MPa m3 0.00% 35.00 08/01/2022 22/01/2022 14.00 15.00 2.50 35.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.3333 2.3333 2.3333 2.3333 2.3333 2.3333 14 86.471 0.4 2.3333 2.3333 2.3333 2.3333 2.3333 2.3333 2.3333 16.3 100.8828 0.47 2.3333 2.3333 0 0 0 0 0 4.67 28.82367 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
394 04.03.01.05.02 S5 RAG ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 201.00 05/01/2022 18/01/2022 14.00 14.00 14.36 201.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14.357 14.357 28.7 70.941514 0.14 14.357 14.357 14.357 14.357 14.357 14.357 14.357 100.5 248.2953 0.5 14.357 14.357 14.357 14.357 14.357 0 0 71.8 177.3538 0.36 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
395 04.03.01.05.03 S5 RAG SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 21.43% 1,289.36 04/01/2022 18/01/2022 14.00 15.00 92.10 1289.36 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 85.957 85.957 85.957 258 30.085067 0.16 85.957 85.957 85.957 85.957 85.957 85.957 85.957 601.7 70.1984889 0.37 85.957 85.957 85.957 85.957 85.957 0 0 430 50.14178 0.26 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
396 04.03.01.06 S5 RAG CONCRETO ARMADO PARA FOSA DE RETENCIÓN DE DERRAMES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
397 04.03.01.06.01 S5 RAG LOSAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
398 04.03.01.06.01.01 S5 RAG COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 12/11/2021 16/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
399 04.03.01.06.01.02 S5 RAG ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 0.00 12/11/2021 16/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
400 04.03.01.06.01.03 S5 RAG SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 100.00% 0.00 12/11/2021 16/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
401 04.03.01.06.02 S5 RAG MUROS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
402 04.03.01.06.02.01 S5 RAG COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 12/11/2021 16/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
403 04.03.01.06.02.02 S5 RAG ENCOFRADO CARAVISTA Y DESENCOFRADO DE MURO m2 100.00% 0.00 12/11/2021 16/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
404 04.03.01.06.02.03 S5 RAG SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 100.00% 0.00 12/11/2021 16/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
405 04.03.01.07 S5 RAG CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
406 04.03.01.07.01 S5 RAG CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.00 12/11/2021 14/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
407 04.03.01.08 S5 RAG TARREJEOS, DERRAMES Y VESTIDURAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
408 04.03.01.08.01 S5 RAG TARRAJEO CON IMPERMEABILIZANTE m2 100.00% 0.00 12/11/2021 14/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
409 04.03.01.09 S5 RAG CARPINTERIA METALICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
410 04.03.01.09.01 S5 RAG SUMINISTRO E INSTALACION DE TAPA METALICA 0.60m x 0.60m INC. und 100.00% 0.00 17/11/2021 19/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
411 04.03.01.09.02 S5 RAG SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 1.58m x 1.35m INC. und 100.00% 0.00 17/11/2021 19/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412 04.03.01.09.03 S5 RAG SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA F°G° CON PLANCHA und 100.00% 0.00 17/11/2021 19/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.1 04.03.01.01 S5 RAG MOVIMIENTO DE TIERRAS PARA TUBERÍAS, BUZONES - RED DE AGUAS GRISES - LÍNEA 1 (OyP, L 0.15 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
412.2 04.03.01.01.01 S5 RAG EXCAVACION PARA BUZONES m3 100.00% 0.15 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.3 04.03.01.01.02 S5 RAG EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 100.00% 0.15 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.4 04.03.01.01.03 S5 RAG EXCAVACION PARA CAJAS DE REGISTRO Y DESARENADOR m3 100.00% 0.15 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.5 04.03.01.01.04 S5 RAG REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.15 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.6 04.03.01.01.05 S5 RAG TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= m3 -KM 100.00% 0.15 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.7 04.03.01.01.06 S5 RAG TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM
m3 -KM 100.00% 0.15 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.8 04.03.01.01.07 S5 RAG COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 100.00% 0.15 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.9 04.03.01.01.08 S5 RAG TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 100.00% 0.15 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.10 04.03.01.01.09 S5 RAG TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 Km3 -KM 100.00% 0.15 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.11 04.03.01.01.10 S5 RAG RELLENO CON MATERIAL 2B DE PRESTAMO m3 100.00% 0.15 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.12 04.03.01.01.11 S5 RAG RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 100.00% 0.15 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.13 04.03.01.01.12 S5 RAG ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.15 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.14 04.03.01.01.13 S5 RAG ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.15 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.15 04.03.01.01.14 S5 RAG APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.15 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.16 04.03.01.01 S5 RAG MOVIMIENTO DE TIERRAS PARA TUBERÍAS, BUZONES - RED DE AGUAS GRISES - LÍNEA 2 (A, F, 0.3 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
412.17 04.03.01.01.01 S5 RAG EXCAVACION PARA BUZONES m3 90.83% 0.3 1.65 31/12/2021 20/01/2022 21.00 21.00 0.08 1.65 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0786 0.0786 0.0786 0.0786 0.0786 0.0786 0.0786 0.55 0.83875 0.03 0.0786 0.0786 0.0786 0.0786 0.0786 0.0786 0.0786 0.55 0.83875 0.03 0.0786 0.0786 0.0786 0.0786 0.0786 0.0786 0.0786 0.55 0.83875 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.18 04.03.01.01.02 S5 RAG EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 90.00% 0.3 34.14 31/12/2021 20/01/2022 21.00 21.00 1.63 34.14 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 1.6257 1.6257 1.6257 1.6257 1.6257 1.6257 1.6257 11.4 16.528095 0.03 1.6257 1.6257 1.6257 1.6257 1.6257 1.6257 1.6257 11.38 16.5280952 0.03 1.6257 1.6257 1.6257 1.6257 1.6257 1.6257 1.6257 11.4 16.5281 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.19 04.03.01.01.03 S5 RAG EXCAVACION PARA CAJAS DE REGISTRO Y DESARENADOR m3 78.52% 0.3 0.97 31/12/2021 20/01/2022 21.00 21.00 0.05 0.97 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0462 0.0462 0.0462 0.0462 0.0462 0.0462 0.0462 0.32 2.0046667 0.07 0.0462 0.0462 0.0462 0.0462 0.0462 0.0462 0.0462 0.3233 2.00466667 0.07 0.0462 0.0462 0.0462 0.0462 0.0462 0.0462 0.0462 0.32 2.004667 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.20 04.03.01.01.04 S5 RAG REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 79.59% 0.3 150.20 31/12/2021 20/01/2022 21.00 21.00 7.15 150.20 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 7.1524 7.1524 7.1524 7.1524 7.1524 7.1524 7.1524 50.1 6.3835 0.07 7.1524 7.1524 7.1524 7.1524 7.1524 7.1524 7.1524 50.067 6.3835 0.07 7.1524 7.1524 7.1524 7.1524 7.1524 7.1524 7.1524 50.1 6.3835 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.21 04.03.01.01.05 S5 RAG TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= m3 -KM 78.52% 0.3 7.67 31/12/2021 20/01/2022 21.00 21.00 0.37 7.67 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.3652 0.3652 0.3652 0.3652 0.3652 0.3652 0.3652 2.56 0.3962833 0.07 0.3652 0.3652 0.3652 0.3652 0.3652 0.3652 0.3652 2.5567 0.39628333 0.07 0.3652 0.3652 0.3652 0.3652 0.3652 0.3652 0.3652 2.56 0.396283 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.22 04.03.01.01.06 S5 RAG TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM
m3 -KM 71.12% 0.3 59.34 31/12/2021 20/01/2022 21.00 21.00 2.83 59.34 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 2.8257 2.8257 2.8257 2.8257 2.8257 2.8257 2.8257 19.8 0.7252667 0.09 2.8257 2.8257 2.8257 2.8257 2.8257 2.8257 2.8257 19.78 0.72526667 0.09 2.8257 2.8257 2.8257 2.8257 2.8257 2.8257 2.8257 19.8 0.725267 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.23 04.03.01.01.07 S5 RAG COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 64.18% 0.3 9.78 31/12/2021 20/01/2022 21.00 21.00 0.47 9.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.4657 0.4657 0.4657 0.4657 0.4657 0.4657 0.4657 3.26 11.138333 0.12 0.4657 0.4657 0.4657 0.4657 0.4657 0.4657 0.4657 3.26 11.1383333 0.12 0.4657 0.4657 0.4657 0.4657 0.4657 0.4657 0.4657 3.26 11.13833 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.24 04.03.01.01.08 S5 RAG TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 64.17% 0.3 37.29 31/12/2021 20/01/2022 21.00 21.00 1.78 37.29 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 1.7757 1.7757 1.7757 1.7757 1.7757 1.7757 1.7757 12.4 1.92665 0.12 1.7757 1.7757 1.7757 1.7757 1.7757 1.7757 1.7757 12.43 1.92665 0.12 1.7757 1.7757 1.7757 1.7757 1.7757 1.7757 1.7757 12.4 1.92665 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.25 04.03.01.01.09 S5 RAG TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 Km3 -KM 64.18% 0.3 216.13 31/12/2021 20/01/2022 21.00 21.00 10.29 216.13 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 10.292 10.292 10.292 10.292 10.292 10.292 10.292 72 2.6415889 0.12 10.292 10.292 10.292 10.292 10.292 10.292 10.292 72.043 2.64158889 0.12 10.292 10.292 10.292 10.292 10.292 10.292 10.292 72 2.641589 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.26 04.03.01.01.10 S5 RAG RELLENO CON MATERIAL 2B DE PRESTAMO m3 75.00% 0.3 20.03 31/12/2021 20/01/2022 21.00 21.00 0.95 20.03 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.9538 0.9538 0.9538 0.9538 0.9538 0.9538 0.9538 6.68 11.851083 0.08 0.9538 0.9538 0.9538 0.9538 0.9538 0.9538 0.9538 6.6767 11.8510833 0.08 0.9538 0.9538 0.9538 0.9538 0.9538 0.9538 0.9538 6.68 11.85108 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.27 04.03.01.01.11 S5 RAG RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 75.00% 0.3 23.40 31/12/2021 20/01/2022 21.00 21.00 1.11 23.40 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 1.1143 1.1143 1.1143 1.1143 1.1143 1.1143 1.1143 7.8 15.795 0.08 1.1143 1.1143 1.1143 1.1143 1.1143 1.1143 1.1143 7.8 15.795 0.08 1.1143 1.1143 1.1143 1.1143 1.1143 1.1143 1.1143 7.8 15.795 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.28 04.03.01.01.12 S5 RAG ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 69.55% 0.3 102.87 31/12/2021 20/01/2022 21.00 21.00 4.90 102.87 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 4.8986 4.8986 4.8986 4.8986 4.8986 4.8986 4.8986 34.3 3.936492 0.1 4.8986 4.8986 4.8986 4.8986 4.8986 4.8986 4.8986 34.29 3.936492 0.1 4.8986 4.8986 4.8986 4.8986 4.8986 4.8986 4.8986 34.3 3.936492 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.29 04.03.01.01.13 S5 RAG ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 69.55% 0.3 205.64 31/12/2021 20/01/2022 21.00 21.00 9.79 205.64 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 9.7924 9.7924 9.7924 9.7924 9.7924 9.7924 9.7924 68.5 3.2011293 0.1 9.7924 9.7924 9.7924 9.7924 9.7924 9.7924 9.7924 68.547 3.20112933 0.1 9.7924 9.7924 9.7924 9.7924 9.7924 9.7924 9.7924 68.5 3.201129 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.30 04.03.01.01.14 S5 RAG APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 73.95% 0.3 88.01 31/12/2021 20/01/2022 21.00 21.00 4.19 88.01 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 4.191 4.191 4.191 4.191 4.191 4.191 4.191 29.3 6.8896717 0.09 4.191 4.191 4.191 4.191 4.191 4.191 4.191 29.337 6.88967172 0.09 4.191 4.191 4.191 4.191 4.191 4.191 4.191 29.3 6.889672 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.31 04.03.01.01 S5 RAG MOVIMIENTO DE TIERRAS PARA TUBERÍAS, BUZONES - RED DE AGUAS GRISES - LÍNEA 3 (D, B, 0.19 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
412.32 04.03.01.01.01 S5 RAG EXCAVACION PARA BUZONES m3 96.96% 0.19 0.35 17/12/2021 06/01/2022 21.00 21.00 0.02 0.35 X 0.0167 0.0167 0.0167 0.0167 0.0167 0.0167 0.0167 0.12 0.18 0.01 0.0167 0.0167 0.0167 0.0167 0.0167 0.0167 0.0167 0.12 0.1779167 0.01 0.0167 0.0167 0.0167 0.0167 0.0167 0.0167 0.0167 0.12 0.1779167 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.33 04.03.01.01.02 S5 RAG EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 95.13% 0.19 10.53 17/12/2021 06/01/2022 21.00 21.00 0.50 10.53 X 0.5014 0.5014 0.5014 0.5014 0.5014 0.5014 0.5014 3.51 5.10 0.02 0.5014 0.5014 0.5014 0.5014 0.5014 0.5014 0.5014 3.51 5.0978571 0.02 0.5014 0.5014 0.5014 0.5014 0.5014 0.5014 0.5014 3.51 5.0978571 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.34 04.03.01.01.03 S5 RAG EXCAVACION PARA CAJAS DE REGISTRO Y DESARENADOR m3 92.85% 0.19 0.20 17/12/2021 06/01/2022 21.00 21.00 0.01 0.20 X 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.07 0.41 0.02 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.07 0.4133333 0.02 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.0095 0.07 0.4133333 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.35 04.03.01.01.04 S5 RAG REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 93.20% 0.19 31.71 17/12/2021 06/01/2022 21.00 21.00 1.51 31.71 X 1.51 1.51 1.51 1.51 1.51 1.51 1.51 10.6 1.35 0.02 1.51 1.51 1.51 1.51 1.51 1.51 1.51 10.6 1.347675 0.02 1.51 1.51 1.51 1.51 1.51 1.51 1.51 10.6 1.347675 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.36 04.03.01.01.05 S5 RAG TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= m3 -KM 92.85% 0.19 1.62 17/12/2021 06/01/2022 21.00 21.00 0.08 1.62 X 0.0771 0.0771 0.0771 0.0771 0.0771 0.0771 0.0771 0.54 0.08 0.02 0.0771 0.0771 0.0771 0.0771 0.0771 0.0771 0.0771 0.54 0.0837 0.02 0.0771 0.0771 0.0771 0.0771 0.0771 0.0771 0.0771 0.54 0.0837 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.37 04.03.01.01.06 S5 RAG TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM
m3 -KM 90.37% 0.19 12.53 17/12/2021 06/01/2022 21.00 21.00 0.60 12.53 X 0.5967 0.5967 0.5967 0.5967 0.5967 0.5967 0.5967 4.18 0.15 0.03 0.5967 0.5967 0.5967 0.5967 0.5967 0.5967 0.5967 4.18 0.1531444 0.03 0.5967 0.5967 0.5967 0.5967 0.5967 0.5967 0.5967 4.18 0.1531444 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.38 04.03.01.01.07 S5 RAG COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 88.05% 0.19 2.07 17/12/2021 06/01/2022 21.00 21.00 0.10 2.07 X 0.0986 0.0986 0.0986 0.0986 0.0986 0.0986 0.0986 0.69 2.36 0.04 0.0986 0.0986 0.0986 0.0986 0.0986 0.0986 0.0986 0.69 2.3575 0.04 0.0986 0.0986 0.0986 0.0986 0.0986 0.0986 0.0986 0.69 2.3575 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.39 04.03.01.01.08 S5 RAG TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 88.06% 0.19 7.87 17/12/2021 06/01/2022 21.00 21.00 0.37 7.87 X 0.3748 0.3748 0.3748 0.3748 0.3748 0.3748 0.3748 2.62 0.41 0.04 0.3748 0.3748 0.3748 0.3748 0.3748 0.3748 0.3748 2.62 0.4066167 0.04 0.3748 0.3748 0.3748 0.3748 0.3748 0.3748 0.3748 2.62 0.4066167 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.40 04.03.01.01.09 S5 RAG TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 Km3 -KM 88.06% 0.19 45.63 17/12/2021 06/01/2022 21.00 21.00 2.17 45.63 X 2.1729 2.1729 2.1729 2.1729 2.1729 2.1729 2.1729 15.2 0.56 0.04 2.1729 2.1729 2.1729 2.1729 2.1729 2.1729 2.1729 15.2 0.5577 0.04 2.1729 2.1729 2.1729 2.1729 2.1729 2.1729 2.1729 15.2 0.5577 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.41 04.03.01.01.10 S5 RAG RELLENO CON MATERIAL 2B DE PRESTAMO m3 85.86% 0.19 7.18 17/12/2021 06/01/2022 21.00 21.00 0.34 7.18 X 0.3419 0.3419 0.3419 0.3419 0.3419 0.3419 0.3419 2.39 4.25 0.05 0.3419 0.3419 0.3419 0.3419 0.3419 0.3419 0.3419 2.39 4.2481667 0.05 0.3419 0.3419 0.3419 0.3419 0.3419 0.3419 0.3419 2.39 4.2481667 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.42 04.03.01.01.11 S5 RAG RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 83.33% 0.19 9.88 17/12/2021 06/01/2022 21.00 21.00 0.47 9.88 X 0.4705 0.4705 0.4705 0.4705 0.4705 0.4705 0.4705 3.29 6.67 0.06 0.4705 0.4705 0.4705 0.4705 0.4705 0.4705 0.4705 3.29 6.669 0.06 0.4705 0.4705 0.4705 0.4705 0.4705 0.4705 0.4705 3.29 6.669 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.43 04.03.01.01.12 S5 RAG ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 89.85% 0.19 21.72 17/12/2021 06/01/2022 21.00 21.00 1.03 21.72 X 1.0343 1.0343 1.0343 1.0343 1.0343 1.0343 1.0343 7.24 0.83 0.03 1.0343 1.0343 1.0343 1.0343 1.0343 1.0343 1.0343 7.24 0.831152 0.03 1.0343 1.0343 1.0343 1.0343 1.0343 1.0343 1.0343 7.24 0.831152 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.44 04.03.01.01.13 S5 RAG ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 89.85% 0.19 43.41 17/12/2021 06/01/2022 21.00 21.00 2.07 43.41 X 2.0671 2.0671 2.0671 2.0671 2.0671 2.0671 2.0671 14.5 0.68 0.03 2.0671 2.0671 2.0671 2.0671 2.0671 2.0671 2.0671 14.5 0.675749 0.03 2.0671 2.0671 2.0671 2.0671 2.0671 2.0671 2.0671 14.5 0.675749 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.45 04.03.01.01.14 S5 RAG APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 91.31% 0.19 18.58 17/12/2021 06/01/2022 21.00 21.00 0.88 18.58 X 0.8848 0.8848 0.8848 0.8848 0.8848 0.8848 0.8848 6.19 1.45 0.03 0.8848 0.8848 0.8848 0.8848 0.8848 0.8848 0.8848 6.19 1.4544949 0.03 0.8848 0.8848 0.8848 0.8848 0.8848 0.8848 0.8848 6.19 1.4544949 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.46 04.03.01.01 S5 RAG MOVIMIENTO DE TIERRAS PARA TUBERÍAS, BUZONES - RED DE AGUAS GRISES - LÍNEA 4 (K1 a 0.12 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
412.47 04.03.01.01.01 S5 RAG EXCAVACION PARA BUZONES m3 100.00% 0.12 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.48 04.03.01.01.02 S5 RAG EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 100.00% 0.12 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.49 04.03.01.01.03 S5 RAG EXCAVACION PARA CAJAS DE REGISTRO Y DESARENADOR m3 100.00% 0.12 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.50 04.03.01.01.04 S5 RAG REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.12 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.51 04.03.01.01.05 S5 RAG TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= m3 -KM 100.00% 0.12 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.52 04.03.01.01.06 S5 RAG TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM
m3 -KM 100.00% 0.12 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.53 04.03.01.01.07 S5 RAG COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 100.00% 0.12 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.54 04.03.01.01.08 S5 RAG TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 100.00% 0.12 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.55 04.03.01.01.09 S5 RAG TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 Km3 -KM 100.00% 0.12 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.56 04.03.01.01.10 S5 RAG RELLENO CON MATERIAL 2B DE PRESTAMO m3 100.00% 0.12 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.57 04.03.01.01.11 S5 RAG RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 100.00% 0.12 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.58 04.03.01.01.12 S5 RAG ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.12 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.59 04.03.01.01.13 S5 RAG ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.12 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.60 04.03.01.01.14 S5 RAG APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.12 0.00 10/12/2021 23/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.61 04.03.01.01 S5 RAG MOVIMIENTO DE TIERRAS PARA TUBERÍAS, BUZONES - RED DE AGUAS GRISES - LÍNEA EXTER 0.24 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
412.62 04.03.01.01.01 S5 RAG EXCAVACION PARA BUZONES m3 95.41% 0.24 0.66 15/01/2022 28/01/2022 14.00 14.00 0.05 0.66 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0471 0.0471 0.0471 0.0471 0.0471 0.0471 0.28 0.431357 0.02 0.0471 0.0471 0.0471 0.0471 0.0471 0.0471 0.0471 0.33 0.50325 0.02 0.0471 0 0 0 0 0 0 0.05 0.0718929 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.63 04.03.01.01.02 S5 RAG EXCAVACIÓN CON MAQUINARIA DE ZANJAS m3 92.69% 0.24 19.95 15/01/2022 28/01/2022 14.00 14.00 1.43 19.95 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.425 1.425 1.425 1.425 1.425 1.425 8.55 12.41786 0.03 1.425 1.425 1.425 1.425 1.425 1.425 1.425 9.98 14.4875 0.04 1.425 0 0 0 0 0 0 1.43 2.0696429 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.64 04.03.01.01.03 S5 RAG EXCAVACION PARA CAJAS DE REGISTRO Y DESARENADOR m3 89.21% 0.24 0.39 15/01/2022 28/01/2022 14.00 14.00 0.03 0.39 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0279 0.0279 0.0279 0.0279 0.0279 0.0279 0.17 1.036286 0.05 0.0279 0.0279 0.0279 0.0279 0.0279 0.0279 0.0279 0.2 1.209 0.05 0.0279 0 0 0 0 0 0 0.03 0.1727143 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.65 04.03.01.01.04 S5 RAG REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 89.79% 0.24 60.08 15/01/2022 28/01/2022 14.00 14.00 4.29 60.08 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.2914 4.2914 4.2914 4.2914 4.2914 4.2914 25.7 3.282943 0.04 4.2914 4.2914 4.2914 4.2914 4.2914 4.2914 4.2914 30 3.8301 0.05 4.2914 0 0 0 0 0 0 4.29 0.5471571 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.66 04.03.01.01.05 S5 RAG TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= m3 -KM 89.27% 0.24 3.07 15/01/2022 28/01/2022 14.00 14.00 0.22 3.07 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2193 0.2193 0.2193 0.2193 0.2193 0.2193 1.32 0.203936 0.05 0.2193 0.2193 0.2193 0.2193 0.2193 0.2193 0.2193 1.54 0.237925 0.06 0.2193 0 0 0 0 0 0 0.22 0.0339893 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.67 04.03.01.01.06 S5 RAG TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM > 1KM
m3 -KM 85.56% 0.24 23.74 15/01/2022 28/01/2022 14.00 14.00 1.70 23.74 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.6957 1.6957 1.6957 1.6957 1.6957 1.6957 10.2 0.373057 0.06 1.6957 1.6957 1.6957 1.6957 1.6957 1.6957 1.6957 11.9 0.435233 0.07 1.6957 0 0 0 0 0 0 1.7 0.0621762 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
412.68 04.03.01.01.07 S5 RAG COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 82.08% 0.24 3.91 15/01/2022 28/01/2022 14.00 14.00 0.28 3.91 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
424 04.03.02.01.05 S5 RAG 975-PWU-2"-MDE0HU-100028 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
425 04.03.02.01.05.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø2" m 0.00% 2.00 15/01/2022 21/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2857 0.2857 0.2857 0.2857 0.2857 0.2857 1.71 17.14286 0.86 0.2857 0 0 0 0 0 0 0.29 2.857143 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
426 04.03.02.01.05.02 S5 RAG El, 90Deg, PE, PE D3350 ø2" und 0.00% 3.00 15/01/2022 15/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 3 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
427 04.03.02.01.06 S5 RAG 975-PWU-4"-MDE0HU-100031 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
428 04.03.02.01.06.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 0.00% 8.00 15/01/2022 21/01/2022 7.00 7.00 1.14 8.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.1429 1.1429 1.1429 1.1429 1.1429 1.1429 6.86 6 0.86 1.1429 0 0 0 0 0 0 1.14 1 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
429 04.03.02.01.07 S5 RAG 975-PWU-2"-MDE0HU-100030 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
430 04.03.02.01.07.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø2" m 30.00% 2.10 15/01/2022 21/01/2022 7.00 7.00 0.30 2.10 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3 0.3 0.3 0.3 0.3 0.3 1.8 12 0.6 0.3 0 0 0 0 0 0 0.3 2 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
431 04.03.02.01.07.02 S5 RAG El, 90Deg, PE, PE D3350 ø2" und 0.00% 3.00 15/01/2022 15/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 3 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
432 04.03.02.01.08 S5 RAG 975-PWU-4"-MDE0HU-100032 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
433 04.03.02.01.08.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 30.00% 10.50 15/01/2022 21/01/2022 7.00 7.00 1.50 10.50 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.5 1.5 1.5 1.5 1.5 1.5 9 13.2 0.6 1.5 0 0 0 0 0 0 1.5 2.2 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
434 04.03.02.01.08.02 S5 RAG YEE, PE, PE D3350 ø4" und 0.00% 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 1 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
435 04.03.02.01.09 S5 RAG 975-PWU-2"-MDE0HU-100036 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
436 04.03.02.01.09.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø2" m 30.00% 18.20 07/01/2022 13/01/2022 7.00 7.00 2.60 18.20 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.6 2.6 2.6 2.6 2.6 2.6 2.6 18.2 21.4375 0.69 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
437 04.03.02.01.09.02 S5 RAG YEE, PE, PE D3350 ø2" und 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
438 04.03.02.01.09.03 S5 RAG El, 90Deg, PE, PE D3350 ø2" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
439 04.03.02.01.10 S5 RAG 975-PWU-2"-MDE0HU-100040 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
440 04.03.02.01.10.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø2" m 0.00% 2.00 07/01/2022 13/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2857 0.2857 0.2857 0.2857 0.2857 0.2857 0.2857 2 20 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
441 04.03.02.01.10.02 S5 RAG El, 90Deg, PE, PE D3350 ø2" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
442 04.03.02.01.11 S5 RAG 975-PWU-2"-MDE0HU-100043 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
443 04.03.02.01.11.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø2" m 30.00% 13.30 07/01/2022 13/01/2022 7.00 7.00 1.90 13.30 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.9 1.9 1.9 1.9 1.9 1.9 1.9 13.3 14.65625 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
444 04.03.02.01.11.02 S5 RAG El, 90Deg, PE, PE D3350 ø2" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
445 04.03.02.01.12 S5 RAG 975-PWU-4"-MDE0HU-100048 / 100052 & 100055 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
446 04.03.02.01.12.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 0.00% 4.00 07/01/2022 13/01/2022 7.00 7.00 0.57 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5714 0.5714 0.5714 0.5714 0.5714 0.5714 0.5714 4 7.5 0.94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
447 04.03.02.01.13 S5 RAG 975-PWU-4"-MDE0HU-100056 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
448 04.03.02.01.13.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 0.00% 8.00 07/01/2022 13/01/2022 7.00 7.00 1.14 8.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.1429 1.1429 1.1429 1.1429 1.1429 1.1429 1.1429 8 7.5 0.94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
449 04.03.02.01.14 S5 RAG 975-PWU-4"-MDE0HU-100057 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
450 04.03.02.01.14.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 0.00% 7.00 07/01/2022 13/01/2022 7.00 7.00 1.00 7.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 7 7.5 0.94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
451 04.03.02.01.15 S5 RAG 975-PWU-4"-MDE0HU-100058 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
452 04.03.02.01.15.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 0.00% 7.00 07/01/2022 13/01/2022 7.00 7.00 1.00 7.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 7 18.25 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
453 04.03.02.01.15.02 S5 RAG YEE, PE, PE D3350 ø4" und 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
454 04.03.02.01.16 S5 RAG 975-PWU-6"-MDE0HU-100059 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
455 04.03.02.01.16.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.00% 8.00 07/01/2022 13/01/2022 7.00 7.00 1.14 8.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.1429 1.1429 1.1429 1.1429 1.1429 1.1429 1.1429 8 7.5 0.94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
456 04.03.02.01.17 S5 RAG 975-PWU-6"-MDE0HU-100060 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
457 04.03.02.01.17.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.00% 5.00 07/01/2022 13/01/2022 7.00 7.00 0.71 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7143 0.7143 0.7143 0.7143 0.7143 0.7143 0.7143 5 7.5 0.94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
458 04.03.02.01.18 S5 RAG 975-PWU-6"-MDE0HU-100061 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
459 04.03.02.01.18.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 18.20 07/01/2022 13/01/2022 7.00 7.00 2.60 18.20 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.6 2.6 2.6 2.6 2.6 2.6 2.6 18.2 8.09375 0.67 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
460 04.03.02.01.19 S5 RAG 975-PWU-6"-MDE0HU-100062 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
461 04.03.02.01.19.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 11.90 07/01/2022 13/01/2022 7.00 7.00 1.70 11.90 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.7 1.7 1.7 1.7 1.7 1.7 1.7 11.9 5.25 0.66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
462 04.03.02.01.20 S5 RAG 975-PWU-4"-MDE0HU-100063 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
463 04.03.02.01.20.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø4" m 0.00% 2.00 07/01/2022 13/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2857 0.2857 0.2857 0.2857 0.2857 0.2857 0.2857 2 7.2 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
464 04.03.02.01.21 S5 RAG 975-PWU-6"-MDE0HU-100064 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
465 04.03.02.01.21.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 14.00 07/01/2022 13/01/2022 7.00 7.00 2.00 14.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 2 2 2 2 14 14 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
466 04.03.02.01.21.02 S5 RAG YEE, PE, PE D3350 ø6" und 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
467 04.03.02.01.22 S5 RAG 975-PWU-6"-MDE0HU-100070 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
468 04.03.02.01.22.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 5.60 07/01/2022 13/01/2022 7.00 7.00 0.80 5.60 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.8 0.8 0.8 0.8 0.8 0.8 0.8 5.6 28.175 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
469 04.03.02.01.22.02 S5 RAG El, 90Deg, PE, PE D3350 ø6" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
470 04.03.02.01.23 S5 RAG 975-PWU-2"-MDE0HU-100073 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
471 04.03.02.01.23.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø2" m 0.00% 9.00 07/01/2022 13/01/2022 7.00 7.00 1.29 9.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.2857 1.2857 1.2857 1.2857 1.2857 1.2857 1.2857 9 16 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
472 04.03.02.01.23.02 S5 RAG El, 90Deg, PE, PE D3350 ø2" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
473 04.03.02.01.24 S5 RAG 975-PWU-6"-MDE0HU-100074 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
474 04.03.02.01.24.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.00% 6.00 07/01/2022 13/01/2022 7.00 7.00 0.86 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.8571 0.8571 0.8571 0.8571 0.8571 0.8571 0.8571 6 14.3 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
475 04.03.02.01.24.02 S5 RAG FlgAdt, PE D3350, PE, 6"Ø und 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
476 04.03.02.01.24.03 S5 RAG FlgBkg, A536, CL150, FF, 6"Ø und 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
477 04.03.02.01.25 S5 RAG 975-PWU-1 1/2"-MDE0HU-100082 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
478 04.03.02.01.25.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø1 1/2" m 0.00% 9.00 07/01/2022 13/01/2022 7.00 7.00 1.29 9.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.2857 1.2857 1.2857 1.2857 1.2857 1.2857 1.2857 9 10.625 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
479 04.03.02.01.25.02 S5 RAG El, 45Deg, PE, PE D3350 ø1 1/2" und 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
480 04.03.02.01.26 S5 RAG 975-PWU-2"-MDE0HU-100086 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
481 04.03.02.01.26.01 S5 RAG SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE CORRUGADA Y PE m 30.00% 7.70 07/01/2022 13/01/2022 7.00 7.00 1.10 7.70 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.1 1.1 1.1 1.1 1.1 1.1 1.1 7.7 3.88645833 0.65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
482 04.03.02.01.26.02 S5 RAG YEE con Reducción ø2" a ø1 1/4" und 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
483 04.03.02.01.27 S5 RAG 975-PWU-2"-MDE0HU-100088 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
484 04.03.02.01.27.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø2" m 0.00% 1.00 07/01/2022 13/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 25.5 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
485 04.03.02.01.27.02 S5 RAG El, 90Deg, PE, PE D3350 ø2" und 0.00% 3.00 07/01/2022 07/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 3 0 0 0 0 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
486 04.03.02.01.27.03 S5 RAG FlgAdt, PE D3350, PE., ø2" und 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
487 04.03.02.01.27.04 S5 RAG FlgBkg, A536, CL 150,FF., ø2" und 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
488 04.03.02.01.27.05 S5 RAG FlgThd. A105. CL150. FF. StdF. B16.5., ø2" und 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
489 04.03.02.01.27.06 S5 RAG Nipple, TBEM, A106-B, XS, 3in., ø2" und 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
490 04.03.02.01.28 S5 RAG 975-SD-4"-M0E03U-100089 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
491 04.03.02.01.28.01 S5 RAG SUMINISTRO E INSTALACION DE TUBERIA HDPE CORRUGADA Y PE m 0.00% 32.00 07/01/2022 13/01/2022 7.00 7.00 4.57 32.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.5714 4.5714 4.5714 4.5714 4.5714 4.5714 4.5714 32 21.5 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
492 04.03.02.01.28.02 S5 RAG 45Deg, HDPE CORRUGADO ø4" und 0.00% 4.00 07/01/2022 07/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 4 0 0 0 0 0 0 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
493 04.03.02.01.29 S5 RAG 975-PWU-6"-MDE0HU-100090 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
494 04.03.02.01.29.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.00% 4.00 07/01/2022 13/01/2022 7.00 7.00 0.57 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5714 0.5714 0.5714 0.5714 0.5714 0.5714 0.5714 4 7.2 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
495 04.03.02.01.30 S5 RAG 975-PWU-6"-MDE0HU-100091 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
496 04.03.02.01.30.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 12.60 07/01/2022 13/01/2022 7.00 7.00 1.80 12.60 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.8 1.8 1.8 1.8 1.8 1.8 1.8 12.6 5.39 0.67 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
497 04.03.02.01.31 S5 RAG 975-PWU-6"-MDE0HU-100092 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
498 04.03.02.01.31.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 10.50 07/01/2022 13/01/2022 7.00 7.00 1.50 10.50 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.5 1.5 1.5 1.5 1.5 1.5 1.5 10.5 4.720625 0.67 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
499 04.03.02.01.32 S5 RAG 975-PWU-6"-MDE0HU-100093 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
500 04.03.02.01.32.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.00% 7.00 07/01/2022 13/01/2022 7.00 7.00 1.00 7.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 7 7.4 1.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
501 04.03.02.01.33 S5 RAG 975-PWU-6"-MDE0HU-100094 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
502 04.03.02.01.33.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.00% 15.00 07/01/2022 13/01/2022 7.00 7.00 2.14 15.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.1429 2.1429 2.1429 2.1429 2.1429 2.1429 2.1429 15 13.94375 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
503 04.03.02.01.33.02 S5 RAG El, 45Deg, PE, PE D3350 ø6" und 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
504 04.03.02.01.34 S5 RAG 975-PWU-6"-MDE0HU-100095 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
505 04.03.02.01.34.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 0.00% 7.00 07/01/2022 13/01/2022 7.00 7.00 1.00 7.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 7 7.3 1.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
506 04.03.02.01.35 S5 RAG 975-PWU-6"-MDE0HU-100096 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
507 04.03.02.01.35.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 14.70 17/12/2021 23/12/2021 7.00 7.00 2.10 14.70 X X 2.1 2.1 2.1 2.1 2.1 2.1 2.1 14.7 6.78 0.68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
508 04.03.02.01.36 S5 RAG 975-PWU-6"-MDE0HU-100097 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
509 04.03.02.01.36.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 23.80 17/12/2021 23/12/2021 7.00 7.00 3.40 23.80 X X 3.4 3.4 3.4 3.4 3.4 3.4 3.4 23.8 10.78 0.72 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
510 04.03.02.01.37 S5 RAG 975-PWU-6"-MDE0HU-100098 / 100099 / 1000100 / 1000101 / 1000102 / 1000103 / 1000104 / 1000105 / 1000106 / 1000107 / 1000108 / 1000109 & 1000111 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
511 04.03.02.01.37.01 S5 RAG Pipe, PE D3350, PE, SDR 15.5 ø6" m 30.00% 279.30 17/12/2021 23/12/2021 7.00 7.00 39.90 279.30 X X 39.9 39.9 39.9 39.9 39.9 39.9 39.9 279 106.64 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
512 04.03.02.01.38 S5 RAG RED DE AGUAS GRISES - FOSA DE RETENCIÓN DE DERRAMES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
513 04.03.02.01.38.01 S5 RAG Pipe, PE D3350, PE, SDR 21 ø6" m 100.00% 0.00 07/01/2022 13/01/2022 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
514 04.03.02.01.38.02 S5 RAG Pipe, A53-B-S, SMLS, StdWt, T&C, ø2" m 100.00% 0.00 07/01/2022 13/01/2022 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
515 04.03.02.01.38.03 S5 RAG FlgBlnd, A105, CL150, FF, StdF, B16.5 ø6" und 0.00% 4.00 07/01/2022 07/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 4 0 0 0 0 0 0 4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
516 04.03.02.01.38.04 S5 RAG Te, BW, A234-WPB, StdWt ø6" und 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
517 04.03.02.01.38.05 S5 RAG FlgAdt, PE D3350, PE, 6"Ø und 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
518 04.03.02.01.38.06 S5 RAG FlgBkg, A536, CL150, FF, 6"Ø und 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
519 04.03.02.01.38.07 S5 RAG Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5 ø6" und 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
520 04.03.02.01.38.08 S5 RAG StdBlt, A193B7/2H Nut, A194-2H, HvyHex, B18.2.2 und 0.00% 32.00 07/01/2022 07/01/2022 1.00 1.00 32.00 32.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 32 0 0 0 0 0 0 32 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
521 04.03.02.01.38.09 S5 RAG Vlv-Chk, WfrTyp, A126B, CL125, FF, StdF, A1BrzSSBuna, 2"Ø, Con canasti pza 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 1 0 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
522 04.03.02.01.38.10 S5 RAG Vlv-Bfly, WfrTyp, A216WCB, CL150, API 609B, BunaNTrim ø6" pza 0.00% 2.00 07/01/2022 07/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
523 04.03.02.01.39 S5 RAG 975-PW-4"-C1E2A-100047 / 100051 & 100054 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
524 04.03.02.01.39.01 S5 RAG Pipe, A53-B-E, ERW, Std Wt, BBE ø4" m 0.00% 4.00 04/01/2022 10/01/2022 7.00 7.00 0.57 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5714 0.5714 0.5714 1.71 27.964286 0.43 0.5714 0.5714 0.5714 0.5714 0 0 0 2.2857 37.2857143 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
525 04.03.02.01.39.02 S5 RAG SO FIg, A105, CL150, FF, StdF, B16.5 ø4" und 0.00% 3.00 04/01/2022 04/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 3 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
526 04.03.02.01.39.03 S5 RAG El, 90Deg, LR, BW A234-WPB, StdWt ø4" und 0.00% 3.00 04/01/2022 04/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 3 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
527 04.03.02.01.39.04 S5 RAG Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø4" und 0.00% 3.00 04/01/2022 04/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 3 0 0 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
528 04.03.02.01.39.05 S5 RAG StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø3/4" pza 0.00% 12.00 04/01/2022 04/01/2022 1.00 1.00 12.00 12.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 12 0 0 12 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
529 04.03.02.01.40 S5 RAG 975-PW-6"-C1E2A-100067 & 100069 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
530 04.03.02.01.40.01 S5 RAG Pipe, A53-B-E, ERW, Std Wt, BBE ø6" m 0.00% 3.00 04/01/2022 10/01/2022 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4286 0.4286 0.4286 1.29 39.540816 0.43 0.4286 0.4286 0.4286 0.4286 0 0 0 1.7143 52.7210884 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
531 04.03.02.01.40.02 S5 RAG SO FIg, A105, CL150, FF, StdF, B16.5 ø6" und 0.00% 2.00 04/01/2022 04/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 2 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
532 04.03.02.01.40.03 S5 RAG El, 90Deg, LR, BW A234-WPB, StdWt ø6" und 0.00% 2.00 04/01/2022 04/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 2 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
533 04.03.02.01.40.04 S5 RAG Gasket, FlatFF, Non Asb / NB, 1/8", CL150, B16.21, B16.5, ø6" und 0.00% 2.00 04/01/2022 04/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 2 0 0 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
534 04.03.02.01.40.05 S5 RAG StdBlt, A193B7/2H, Nut, A194-2H, HvyHex, B18.2.2, ø3/4" pza 0.00% 8.00 04/01/2022 04/01/2022 1.00 1.00 8.00 8.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 8 0 0 8 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
535 04.03.02.02 S5 RAG SOPORTERIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
536 04.03.02.02.01 S5 RAG GA-GS13-4", TUBERÍAS 975-PW-4"-C1E2A-100047 / 100051 & 100054 pza 0.00% 6.00 11/01/2022 11/01/2022 1.00 1.00 6.00 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 6 300 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
537 04.03.02.02.02 S5 RAG A-PT3-2, TUBERÍAS 975-PW-4"-C1E2A-100047 / 100051 & 100054 pza 0.00% 6.00 11/01/2022 11/01/2022 1.00 1.00 6.00 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 6 300 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
538 04.03.02.02.03 S5 RAG GA-GS13-6", TUBERÍAS 975-PW-6"-C1E2A-100067 & 100069 pza 0.00% 4.00 11/01/2022 11/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 4 300 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
539 04.03.02.02.04 S5 RAG A-PT3-2, TUBERÍAS 975-PW-6"-C1E2A-100067 & 100069 pza 0.00% 4.00 11/01/2022 11/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 4 300 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
540 04.03.02.03 S5 RAG PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
541 04.03.02.03.01 S5 RAG PINTURA DE TUBERIAS m2 0.00% 3.00 11/01/2022 11/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 3 16 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
542 05 S2 MODULO A: ALMACÉN DE COMPOSTAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
543 05.01 S2 A DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
544 05.01.01 S2 A MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
545 05.01.01.01 S2 A EXCAVACION P/ZAPATAS m3 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
546 05.01.01.02 S2 A EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 0.00% 30.45 31/12/2021 13/01/2022 14.00 14.00 2.18 30.45 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 2.175 2.175 2.175 2.175 2.175 2.175 2.175 15.2 94.395 0.5 2.175 2.175 2.175 2.175 2.175 2.175 2.175 15.225 94.395 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
547 05.01.01.03 S2 A REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
548 05.01.01.04 S2 A TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.00 05/11/2021 07/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
549 05.01.01.05 S2 A TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 100.00% 0.00 05/11/2021 07/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
550 05.01.01.06 S2 A RELLENO ESTRUCTURAL CON MATERIAL PROPIO SELECCIONADO m3 100.00% 0.00 05/11/2021 07/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
551 05.01.01.07 S2 A MEJORAMIENTO CON MATERIAL GRANULAR m3 100.00% 0.00 05/11/2021 07/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
552 05.01.01.08 S2 A ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
553 05.01.01.09 S2 A ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
554 05.01.01.10 S2 A APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
555 23.02.01.02 S2 SE600KVA CONCRETO SIMPLE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
556 05.01.02.01 S2 A CONCRETO SIMPLE PARA ZAPATAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
557 05.01.02.01.01 S2 A COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
558 05.01.02.02 S2 A CONCRETO SIMPLE PARA LOSAS DE EQUIPOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
559 05.01.02.02.01 S2 A COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.00 14/01/2022 14/01/2022 1.00 1.00 5.00 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 0 0 0 5 29.1665 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
560 05.01.02.02.02 S2 A ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSAS PARA EQUIPO m2 0.00% 4.00 13/01/2022 13/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 9.88235294 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
561 05.01.02.03 S2 A CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
562 05.01.02.02.01 S2 A CURADO DE CONCRETO CON ANTISOL m2 0.00% 47.00 18/01/2022 18/01/2022 1.00 1.00 47.00 47.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 47 0 0 47 6.4625 1.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
563 23.03.01.02 S5 RDBT CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
564 05.01.03.01 S2 A ZAPATAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
565 05.01.03.01.01 S2 A COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 24/10/2021 24/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
566 05.01.03.01.02 S2 A SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 23/10/2021 23/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
567 05.01.03.02 S2 A PEDESTAL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
568 05.01.03.02.01 S2 A COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 05/11/2021 05/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
569 05.01.03.02.02 S2 A ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 100.00% 0.00 28/10/2021 28/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
570 05.01.03.02.03 S2 A SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 23/10/2021 23/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
571 05.01.03.03 S2 A LOSA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
572 05.01.03.03.01 S2 A COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 83.00 03/01/2022 12/01/2022 10.00 10.00 8.30 83.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.3 8.3 8.3 8.3 33.2 193.66556 0.4 8.3 8.3 8.3 8.3 8.3 8.3 0 49.8 290.49834 0.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
573 05.01.03.03.02 S2 A ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 0.00% 33.00 31/12/2021 09/01/2022 10.00 10.00 3.30 33.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 3.3 3.3 3.3 3.3 3.3 3.3 3.3 23.1 57.070588 0.7 3.3 3.3 3.3 0 0 0 0 9.9 24.4588235 0.3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
574 05.01.03.03.03 S2 A SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 3,059.00 28/12/2021 01/01/2022 5.00 5.00 611.80 3059.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 611.8 611.8 611.8 1835 214.13 0.6 611.8 611.8 0 0 0 0 0 1224 142.75333 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
575 05.01.03.04 S2 A POZO SUMIDERO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
576 05.01.03.04.01 S2 A COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 5.8333 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
577 05.01.03.04.02 S2 A ENCOFRADO CARAVISTA Y DESENCOFRADO DE POZO SUMIDERO m2 0.00% 3.00 14/01/2022 14/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 3 7.411765 1.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
578 05.01.03.04.03 S2 A SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 55.00 13/01/2022 13/01/2022 1.00 1.00 55.00 55.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55 55 6.41666667 1.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
579 05.01.03.05 S2 A VEREDA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
580 05.01.03.05.01 S2 A COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.00 18/01/2022 18/01/2022 1.00 1.00 5.00 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 29.1665 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
581 05.01.03.05.02 S2 A ENCOFRADO CARAVISTA Y DESENCOFRADO DE VEREDA m2 0.00% 10.00 17/01/2022 17/01/2022 1.00 1.00 10.00 10.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 0 0 0 10 24.70588 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
582 05.01.03.05.03 S2 A SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 112.00 16/01/2022 16/01/2022 1.00 1.00 112.00 112.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 112 0 0 0 0 112 13.06667 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
583 05.01.03.06 S2 A RAMPA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
584 05.01.03.06.01 S2 A COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.00 21/01/2022 21/01/2022 1.00 1.00 5.00 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 0 0 0 5 29.1665 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
585 05.01.03.06.02 S2 A ENCOFRADO CARAVISTA Y DESENCOFRADO DE RAMPA m2 0.00% 4.00 20/01/2022 20/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 9.882353 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
586 05.01.03.06.03 S2 A SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 173.00 19/01/2022 19/01/2022 1.00 1.00 173.00 173.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 173 0 173 20.18333 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
587 05.01.03.07 S2 A CANAL DE DRENAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
588 05.01.03.07.01 S2 A COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 9.00 28/01/2022 28/01/2022 1.00 1.00 9.00 9.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 0 0 0 0 0 0 9 52.4997 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
589 05.01.03.07.02 S2 A ENCOFRADO CARAVISTA Y DESENCOFRADO DE CANAL DE DRENAJE m2 0.00% 21.00 27/01/2022 27/01/2022 1.00 1.00 21.00 21.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21 21 58.8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
590 05.01.03.07.03 S2 A SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 658.00 26/01/2022 26/01/2022 1.00 1.00 658.00 658.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 658 0 658 76.76667 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
591 05.01.03.08 S2 A SARDINEL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
592 05.01.03.08.01 S2 A COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 19.00 18/01/2022 18/01/2022 1.00 1.00 19.00 19.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19 0 0 19 110.8327 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
593 05.01.03.08.02 S2 A ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 0.00% 70.00 17/01/2022 17/01/2022 1.00 1.00 70.00 70.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 70 0 0 0 70 172.9412 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
594 05.01.03.08.03 S2 A SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 378.00 16/01/2022 16/01/2022 1.00 1.00 378.00 378.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 378 0 0 0 0 378 44.1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
595 05.01.03.09 S2 A CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
596 05.01.03.09.01 S2 A CURADO DE CONCRETO CON ANTISOL m2 80.00% 26.06 22/01/2022 24/01/2022 3.00 3.00 8.69 26.06 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.6867 8.6867 8.6867 0 0 0 26.1 3.58325 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
597 05.01.03.10 S2 A SELLADO DE JUNTAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
598 05.01.03.10.01 S2 A SELLADO DE JUNTA TIPO 1 m 0.00% 39.00 26/01/2022 28/01/2022 3.00 3.00 13.00 39.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 13 26 18.2 0.67 13 0 0 0 0 0 0 13 9.1 0.34 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
599 05.01.03.10.02 S2 A SELLADO DE JUNTA TIPO 2 m 0.00% 143.00 26/01/2022 28/01/2022 3.00 3.00 47.67 143.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 47.667 47.667 95.3 66.73333 0.67 47.667 0 0 0 0 0 0 47.7 33.366667 0.33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
600 05.01.03.10.03 S2 A SELLADO DE JUNTA TIPO 3 m 0.00% 5.00 26/01/2022 28/01/2022 3.00 3.00 1.67 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.6667 1.6667 3.33 2.333333 0.58 1.6667 0 0 0 0 0 0 1.67 1.1666667 0.29 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
601 05.01.03.10.04 S2 A JUNTA TIPICA EN PEDESTAL m 0.00% 28.00 26/01/2022 28/01/2022 3.00 3.00 9.33 28.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9.3333 9.3333 18.7 9.8 0.65 9.3333 0 0 0 0 0 0 9.33 4.9 0.33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
602 05.01.04 S2 A TARREJEOS, DERRAMES Y VESTIDURAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
603 05.01.04.01 S2 A TARRAJEO CON IMPERMEABILIZANTES P/POZO SUM. m2 0.00% 3.00 22/01/2022 22/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 3 5.55 0.93 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
604 05.01.05 S2 A BRUÑAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
605 05.01.05.01 S2 A BRUÑADO EN RAMPA m2 0.00% 34.00 21/01/2022 21/01/2022 1.00 1.00 34.00 34.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 34 0 0 0 0 0 0 34 21.08 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
606 05.01.06 S2 A APLICACIÓN DE GROUT E IMPERMEABILIZANTE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
607 05.01.06.01 S2 A GROUT PARA PEDESTAL E=2.5CM m2 0.00% 3.00 03/01/2022 05/01/2022 3.00 3.00 1.00 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 0 3 32.819735 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
608 05.01.07 S2 A CARPINTERIA METALICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
609 05.01.07.01 S2 A SUMINISTRO E INSTALACIÓN DE PUERTA CORREDIZA P01 INC. RIEL S und 0.00% 2.00 03/02/2022 05/02/2022 3.00 3.00 0.67 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.6667 0.67 34.666667 0.33 0.6667 0.6667 0 0 0 0 0 1.3369.33333 0.67 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
610 05.01.07.02 S2 A SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.25m m 0.00% 35.00 03/02/2022 05/02/2022 3.00 3.00 11.67 35.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11.667 11.7 15.87963 0.33 11.667 11.667 0 0 0 0 0 23.331.75926 0.66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
611 05.01.07.03 S2 A SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.275m m 0.00% 3.00 03/02/2022 05/02/2022 3.00 3.00 1.00 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1.4327485 0.36 1 1 0 0 0 0 0 22.865497 0.72 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
612 05.01.07.04 S2 A SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.575m m 0.00% 3.00 03/02/2022 05/02/2022 3.00 3.00 1.00 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 3.6728395 0.33 1 1 0 0 0 0 0 27.345679 0.67 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
613 05.01.08 S2 A ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
614 05.01.08.01 S2 A MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
615 05.01.08.01.01 S2 A SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
616 05.01.08.01.01.01 S2 A ACERO ESTRUCTURAL PERFIL W 8x31 lb/ft kg 100.00% 0.00 16/11/2021 18/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
617 05.01.08.01.01.02 S2 A ACERO ESTRUCTURAL TUBO 3"x3"x3 kg 100.00% 0.00 16/11/2021 18/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
618 05.01.08.01.01.03 S2 A ACERO ESTRUCTURAL PLANCHA 5/8" kg 100.00% 0.00 16/11/2021 18/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
619 05.01.08.01.01.04 S2 A ACERO ESTRUCTURAL PLANCHA 1/2" kg 100.00% 0.00 16/11/2021 18/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
620 05.01.08.01.02 S2 A SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
621 05.01.08.01.02.01 S2 A ACERO ESTRUCTURAL TUBO 4"x4"x7.9mm kg 100.00% 0.00 19/11/2021 20/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
622 05.01.08.01.02.02 S2 A ACERO ESTRUCTURAL PERFIL C 6"x2"x1/8" kg 100.00% 0.00 19/11/2021 20/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
623 05.01.08.01.02.03 S2 A ACERO ESTRUCTURAL ANGULO 5"x5"x3/8" kg 100.00% 0.00 19/11/2021 20/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
624 05.01.08.01.02.04 S2 A ACERO ESTRUCTURAL ANGULO 1"x1"x3/16" kg 100.00% 0.00 19/11/2021 20/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
625 05.01.08.01.02.05 S2 A ACERO ESTRUCTURAL PLANCHA 5/8" kg 100.00% 0.00 19/11/2021 20/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
626 05.01.08.01.02.06 S2 A ACERO ESTRUCTURAL PLANCHA 1/2" kg 100.00% 0.00 19/11/2021 20/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
627 05.01.08.01.02.07 S2 A ACERO ESTRUCTURAL PLANCHA 1/4" kg 100.00% 0.00 19/11/2021 20/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
628 05.01.08.01.03 S2 A SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
629 05.01.08.01.03.01 S2 A ACERO ESTRUCTURAL PERFIL W6x16 lb/ft kg 100.00% 0.00 21/11/2021 22/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
630 05.01.08.01.03.02 S2 A ACERO ESTRUCTURAL PERFIL W6x9 lb/ft kg 100.00% 0.00 21/11/2021 22/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
631 05.01.08.01.03.03 S2 A ACERO ESTRUCTURAL PLANCHA 1" kg 100.00% 0.00 23/11/2021 24/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
632 05.01.08.01.03.04 S2 A ACERO ESTRUCTURAL PLANCHA 5/8" kg 100.00% 0.00 23/11/2021 24/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
633 05.01.08.01.03.05 S2 A ACERO ESTRUCTURAL PLANCHA 1/4" kg 100.00% 0.00 25/11/2021 26/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
634 05.01.08.01.04 S2 A SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
635 05.01.08.01.04.01 S2 A ACERO ESTRUCTURAL PERFIL C 6"x2"x1/8" kg 100.00% 0.00 27/11/2021 28/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
636 05.01.08.01.04.02 S2 A ACERO ESTRUCTURAL ANGULO 5"x3/8" kg 100.00% 0.00 27/11/2021 28/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
637 05.01.08.01.05 S2 A SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
638 05.01.08.01.05.01 S2 A ACERO ESTRUCTURAL FIERRO LISO Ø1" kg 100.00% 0.00 29/11/2021 30/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
639 05.01.08.01.05.02 S2 A ACERO ESTRUCTURAL FIERRO LISO Ø5/8" kg 100.00% 0.00 29/11/2021 30/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
640 05.01.08.01.06 S2 A SUMINISTRO, INSTALACIÓN DE COBERTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
641 05.01.08.01.06.01 S2 A SUMINISTRO, INSTALACIÓN COBERTURA TR-4 TRANSLUCIDO m2 100.00% 0.00 03/12/2021 06/12/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
642 05.01.08.01.07 S2 A SUMINISTRO, INSTALACIÓN DE CERRAMIENTO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
643 05.01.08.01.07.01 S2 A SUMINISTRO, INSTALACIÓN CERRAMIENTO TR-4 m2 70.00% 65.70 21/01/2022 27/01/2022 7.00 7.00 9.39 65.70 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9.3857 9.3857 9.3857 9.3857 9.3857 9.3857 9.3857 65.7 28.47 0.3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
644 05.01.08.01.07.02 S2 A INSTALACIÓN PLANCHA DE PANEL TR-4 TRASLUCIDO m2 0.00% 212.00 21/01/2022 27/01/2022 7.00 7.00 30.29 212.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30.286 30.286 30.286 30.286 30.286 30.286 30.286 212 91.86667 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
645 05.01.08.01.08 S2 A SUMINISTRO, INSTALACIÓN DE CUMBRERA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
646 05.01.08.01.08.01 S2 A SUMINISTRO, INSTALACIÓN DE CUMBRERA TR-4 m 57.65% 15.67 28/01/2022 30/01/2022 3.00 3.00 5.22 15.67 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.2233 5.2233 5.2233 0 0 0 0 15.7 2.6391579 0.44 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
647 05.01.08.01.09 S2 A SUMINISTRO, INSTALACIÓN DE ESQUINEROS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
648 05.01.08.01.09.01 S2 A SUMINISTRO, INSTALACIÓN ESQUINEROS TR-4 m 57.65% 8.89 28/01/2022 30/01/2022 3.00 3.00 2.96 8.89 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.9633 2.9633 2.9633 0 0 0 0 8.89 1.4972632 0.37 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
649 05.01.08.01.10 S2 A SUMINISTRO, INSTALACIÓN REMATES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
650 05.01.08.01.10.01 S2 A SUMINISTRO, INSTALACIÓN REMATES TR-4 m 65.28% 7.29 28/01/2022 30/01/2022 3.00 3.00 2.43 7.29 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.43 2.43 2.43 0 0 0 0 7.29 1.2277895 0.31 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
651 05.01.08.01.11 S2 A INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
652 05.01.08.01.11.01 S2 A ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=3/4" kg 100.00% 0.00 28/10/2021 28/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
653 05.01.08.02 S2 A INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
654 05.01.08.02.01 S2 A INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y A kg 100.00% 0.00 26/11/2021 02/12/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
655 05.01.08.03 S2 A PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
656 05.01.08.03.01 S2 A PINTURA DE ELEMENTOS METALICOS m2 100.00% 0.00 01/12/2021 01/12/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
657 05.02 S2 A DISCIPLINA: INSTALACIONES SANITARIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
658 05.02.01 S2 A TUBERIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
659 05.02.01.01 S2 A MONTANTE DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
660 05.02.01.01.01 S2 A 975-SD-4"-P0E03U-100031 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
661 05.02.01.01.01.01 S2 A Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 8.00 01/02/2022 07/02/2022 7.00 7.00 1.14 8.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.1429 1.1429 1.1429 3.43 0.8571429 0.43 1.1429 1.1429 1.1429 1.1429 0 0 0 4.571.142857 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
662 05.02.01.01.01.02 S2 A El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 01/02/2022 07/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.57 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
663 05.02.01.01.02 S2 A 975-SD-4"-P0E03U-100033 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
664 05.02.01.01.02.01 S2 A Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 8.00 01/02/2022 07/02/2022 7.00 7.00 1.14 8.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.1429 1.1429 1.1429 3.43 0.8571429 0.43 1.1429 1.1429 1.1429 1.1429 0 0 0 4.571.142857 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
665 05.02.01.01.02.02 S2 A El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 01/02/2022 07/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.57 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
666 05.02.01.01.03 S2 A 975-SD-4"-P0E03U-100034 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
667 05.02.01.01.03.01 S2 A Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 8.00 01/02/2022 07/02/2022 7.00 7.00 1.14 8.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.1429 1.1429 1.1429 3.43 0.8571429 0.43 1.1429 1.1429 1.1429 1.1429 0 0 0 4.571.142857 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
668 05.02.01.01.03.02 S2 A El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 01/02/2022 07/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.57 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
669 05.02.01.01.03.03 S2 A El, 45Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 01/02/2022 07/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.57 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
670 05.02.01.01.04 S2 A 975-SD-4"-P0E03U-100035 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
671 05.02.01.01.04.01 S2 A Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 7.00 01/02/2022 07/02/2022 7.00 7.00 1.00 7.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 3 0.8571429 0.43 1 1 1 1 0 0 0 41.142857 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
672 05.02.01.01.04.02 S2 A El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 01/02/2022 07/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.57 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
673 05.02.02 S2 A MECÁNICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
674 05.02.02.01 S2 A CANALETAS DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
675 05.02.02.01.01 S2 A ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 0.00% 63.00 28/01/2022 30/01/2022 3.00 3.00 21.00 63.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21 21 21 0 0 0 0 63 105.5625 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
676 05.02.02.01.02 S2 A ACERO ESTRUCTURAL PLANCHA DE F°G° E= 0.8MM kg 0.00% 498.00 28/01/2022 30/01/2022 3.00 3.00 166.00 498.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 166 166 166 0 0 0 0 498 105.5625 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
677 05.02.02.02 S2 A SOPORTERIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
678 05.02.02.02.01 S2 A GS1-4", Tubería 975-SD-4"-P0E03U-100031,100033,100034 & 100035 pza 0.00% 12.00 28/01/2022 30/01/2022 3.00 3.00 4.00 12.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 4 0 0 0 0 12 33.5 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
679 05.03 S2 A DISCIPLINA: INSTALACIONES ELÉCTRICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
680 05.03.01 S2 A SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
681 05.03.01.01 S2 A SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE P pto 0.00% 10.00 01/02/2022 07/02/2022 7.00 7.00 1.43 10.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.4286 1.4286 1.4286 4.29 25.999714 0.43 1.4286 1.4286 1.4286 1.4286 0 0 0 5.7134.66629 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
682 05.03.01.02 S2 A SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE pto 0.00% 3.00 01/02/2022 07/02/2022 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4286 0.4286 0.4286 1.29 7.7999143 0.43 0.4286 0.4286 0.4286 0.4286 0 0 0 1.7110.39989 0.58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
683 05.03.01.03 S2 A SUMINISTRO Y MONTAJE DE INTERRUPTOR DOBLE LEVINTON WATHER pto 0.00% 1.00 01/02/2022 07/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 0.7542857 0.38 0.1429 0.1429 0.1429 0.1429 0 0 0 0.571.005714 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
684 05.03.01.04 S2 A SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON WAT pto 0.00% 5.00 01/02/2022 07/02/2022 7.00 7.00 0.71 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7143 0.7143 0.7143 2.14 9.4285714 0.43 0.7143 0.7143 0.7143 0.7143 0 0 0 2.8612.57143 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
685 05.03.01.05 S2 A SUMINISTRO Y MONTAJE DE TOMACORRIENTE INDUSTRIAL TRIFÁSICO pto 0.00% 1.00 01/02/2022 07/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 2.4 0.4 0.1429 0.1429 0.1429 0.1429 0 0 0 0.57 3.2 0.53 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
686 05.03.02 S2 A TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
687 05.03.02.01 S2 A SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1132 UND 0.00% 1.00 01/02/2022 07/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 38.61 0.43 0.1429 0.1429 0.1429 0.1429 0 0 0 0.57 51.48 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
688 05.03.02.02 S2 A SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-COA-913 UND 0.00% 1.00 01/02/2022 07/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 25.714286 0.43 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5734.28571 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
689 05.03.03 S2 A CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
690 05.03.03.01 S2 A SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 163.00 01/02/2022 07/02/2022 7.00 7.00 23.29 163.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23.286 23.286 23.286 69.9 63.074014 0.43 23.286 23.286 23.286 23.286 0 0 0 93.184.09869 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
691 05.03.03.02 S2 A SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 1"Ø m 0.00% 8.00 01/02/2022 07/02/2022 7.00 7.00 1.14 8.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.1429 1.1429 1.1429 3.43 2.8186286 0.4 1.1429 1.1429 1.1429 1.1429 0 0 0 4.573.758171 0.54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
692 05.03.03.03 S2 A SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 5.00 01/02/2022 07/02/2022 7.00 7.00 0.71 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7143 0.7143 0.7143 2.14 1.9347857 0.39 0.7143 0.7143 0.7143 0.7143 0 0 0 2.862.579714 0.52 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
693 05.03.03.04 S2 A SUMINISTRO E INSTALACIÓN DE TUBERIA FLEXIBLE Y ACCESORIOS RGS m 0.00% 1.00 01/02/2022 07/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 0.4514571 0.45 0.1429 0.1429 0.1429 0.1429 0 0 0 0.570.601943 0.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
694 05.03.03.05 S2 A SUMINISTRO E INSTALACIÓN DE TUBERIA FLEXIBLE Y ACCESORIOS RGS m 0.00% 5.00 01/02/2022 07/02/2022 7.00 7.00 0.71 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7143 0.7143 0.7143 2.14 2.7085714 0.45 0.7143 0.7143 0.7143 0.7143 0 0 0 2.863.611429 0.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
695 05.03.03.06 S2 A SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 27.00 01/02/2022 07/02/2022 7.00 7.00 3.86 27.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.8571 3.8571 3.8571 11.6 14.070857 0.43 3.8571 3.8571 3.8571 3.8571 0 0 0 15.418.76114 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
696 05.03.03.07 S2 A SUMINISTRO E INSTALACIÓN DE BANDEJA ESCALERILLA 450X150MM m 0.00% 48.00 01/02/2022 07/02/2022 7.00 7.00 6.86 48.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.8571 6.8571 6.8571 20.6 34.008686 0.43 6.8571 6.8571 6.8571 6.8571 0 0 0 27.445.34491 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
697 05.03.04 S2 A CONDUCTORES Y CABLES DE ENERGIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
698 05.03.04.01 S2 A SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-4/C #2AWG + GRD; XHHW- M 0.00% 136.00 01/02/2022 07/02/2022 7.00 7.00 19.43 136.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19.429 19.429 19.429 58.3 16.821257 0.43 19.429 19.429 19.429 19.429 0 0 0 77.722.42834 0.58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
699 05.03.04.02 S2 A SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW M 0.00% 329.00 01/02/2022 07/02/2022 7.00 7.00 47.00 329.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 47 47 47 141 40.6926 0.43 47 47 47 47 0 0 0 188 54.2568 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
700 05.03.04.03 S2 A SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-4/C #8AWG+GRD; XHHW-2 M 0.00% 65.00 01/02/2022 07/02/2022 7.00 7.00 9.29 65.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9.2857 9.2857 9.2857 27.9 27.857143 0.43 9.2857 9.2857 9.2857 9.2857 0 0 0 37.137.14286 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
701 05.03.05 S2 A EQUIPOS ELÉCTRICOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
702 05.03.05.01 S2 A INSTALACIÓN DE EQUIPO 1 TRITURADOR DE RESIDUOS ORGÁNICOS 1 und 0.00% 1.00 19/01/2022 23/01/2022 5.00 5.00 0.20 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2 0.2 0.4 16 0.4 0.2 0.2 0.2 0 0 0 0 0.6 24 0.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
703 05.03.05.02 S2 A INSTALACIÓN DE EQUIPO DESHIDRATADORES 44.7 KW 440 V TRIFÁSI und 0.00% 3.00 19/01/2022 23/01/2022 5.00 5.00 0.60 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.6 0.6 1.2 74.4 0.4 0.6 0.6 0.6 0 0 0 0 1.8 111.6 0.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
704 05.03.05.03 S2 A SUMINISTRO E INSTALACIÓN DE EQUIPO VENTILADOR 0.69HP - 220V und 0.00% 2.00 19/01/2022 23/01/2022 5.00 5.00 0.40 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4 0.4 0.8 3.392 0.42 0.4 0.4 0.4 0 0 0 0 1.2 5.088 0.64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
705 05.03.06 S2 A EQUIPOS MECÁNICOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
706 05.03.06.01 S2 A SUMINISTRO Y MONTAJE DE EXTRACTOR EÓLICO DE 20" und 0.00% 6.00 19/01/2022 23/01/2022 5.00 5.00 1.20 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.2 1.2 2.4 16.9596 0.4 1.2 1.2 1.2 0 0 0 0 3.6 25.4394 0.61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
707 06 S1 B MÓDULO B: LOSA DE VOLATILIZACIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
708 06.01 S1 B DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
709 06.01.01 S1 B MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
710 06.01.01.01 S1 B EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 0.00% 20.00 31/12/2021 04/01/2022 5.00 5.00 4.00 20.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 4 4 4 4 4 0 0 20 124 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
711 06.01.01.02 S1 B REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.00% 746.00 01/01/2022 05/01/2022 5.00 5.00 149.20 746.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 149.2 149.2 149.2 149.2 149.2 0 746 95.115 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
712 06.01.01.03 S1 B TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 0.00% 49.00 10/01/2022 14/01/2022 5.00 5.00 9.80 49.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9.8 9.8 9.8 9.8 39.2 6.076 0.76 9.8 0 0 0 0 0 0 9.8 1.519 0.19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
713 06.01.01.04 S1 B TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 0.00% 282.00 10/01/2022 14/01/2022 5.00 5.00 56.40 282.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56.4 56.4 56.4 56.4 225.6 8.272 0.83 56.4 0 0 0 0 0 0 56.4 2.068 0.21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
714 06.01.01.05 S1 B MEJORAMIENTO CON MATERIAL FINO DE PRÉSTAMO m3 0.00% 38.00 10/01/2022 14/01/2022 5.00 5.00 7.60 38.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.6 7.6 7.6 7.6 30.4 18.848 0.79 7.6 0 0 0 0 0 0 7.6 4.712 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
715 06.01.01.06 S1 B ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.00% 25.00 31/12/2021 04/01/2022 5.00 5.00 5.00 25.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 5 5 5 5 5 0 0 25 2.87 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
716 06.01.01.07 S1 B ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.00% 49.00 31/12/2021 04/01/2022 5.00 5.00 9.80 49.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 9.8 9.8 9.8 9.8 9.8 0 0 49 2.2883 1.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
717 06.01.01.08 S1 B APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.00% 25.00 31/12/2021 04/01/2022 5.00 5.00 5.00 25.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 5 5 5 5 5 0 0 25 5.8712121 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
718 23.05.01.02 S1 B CONCRETO SIMPLE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
719 06.01.02.01 S1 B PEDESTAL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
720 06.01.02.01.01 S1 B COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 1.00 09/01/2022 09/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 5.8333 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
721 06.01.02.01.02 S1 B ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 0.00% 3.00 07/01/2022 08/01/2022 2.00 2.00 1.50 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.5 1.5 0 0 0 0 0 3 7.875 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
722 06.01.02.01.03 S1 B SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 41.00 05/01/2022 06/01/2022 2.00 2.00 20.50 41.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20.5 20.5 41 4.7833333 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
723 06.01.02.02 S1 B LOSA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
724 06.01.02.02.01 S1 B COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 146.00 22/01/2022 04/02/2022 14.00 14.00 10.43 146.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10.429 10.429 10.429 10.429 10.429 10.429 62.6 364.9979 0.43 10.429 10.429 10.429 10.429 10.429 10.429 10.429 73 425.8309 0.5 10.429 0 0 0 0 0 0 10.460.83299 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
725 06.01.02.02.02 S1 B ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 0.00% 80.00 15/01/2022 28/01/2022 14.00 14.00 5.71 80.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.7143 5.7143 5.7143 5.7143 5.7143 5.7143 34.3 84.70588 0.43 5.7143 5.7143 5.7143 5.7143 5.7143 5.7143 5.7143 40 98.82353 0.5 5.7143 0 0 0 0 0 0 5.71 14.117647 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
726 06.01.02.02.03 S1 B SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 6,087.00 12/01/2022 25/01/2022 14.00 14.00 434.79 6087.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 434.79 434.79 869.57 101.45 0.14 434.79 434.79 434.79 434.79 434.79 434.79 434.79 3044 355.075 0.5 434.79 434.79 434.79 434.79 434.79 0 0 2174 253.625 0.36 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
727 06.01.02.03 S1 B RAMPA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
728 06.01.02.03.01 S1 B COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 5.00 22/01/2022 22/01/2022 1.00 1.00 5.00 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 0 0 5 29.1665 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
729 06.01.02.03.02 S1 B ENCOFRADO CARAVISTA Y DESENCOFRADO DE RAMPA m2 0.00% 4.00 15/01/2022 15/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 4 9.882353 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
730 06.01.02.03.03 S1 B SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 153.00 12/01/2022 12/01/2022 1.00 1.00 153.00 153.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 153 0 153 17.85 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
731 06.01.02.04 S1 B CANAL DE DRENAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
732 06.01.02.04.01 S1 B COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 49.00 19/01/2022 20/01/2022 2.00 2.00 24.50 49.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24.5 24.5 49 285.8317 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
733 06.01.02.04.02 S1 B ENCOFRADO CARAVISTA Y DESENCOFRADO DE CANAL DE DRENAJE m2 0.00% 78.00 16/01/2022 18/01/2022 3.00 3.00 26.00 78.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 26 26 26 0 0 78 218.4 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
734 06.01.02.04.03 S1 B SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 646.00 12/01/2022 15/01/2022 4.00 4.00 161.50 646.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 161.5 161.5 323 37.6833333 0.5 161.5 161.5 0 0 0 0 0 323 37.68333 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
735 06.01.02.05 S1 B SARDINEL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
736 06.01.02.05.01 S1 B COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 14.00 20/01/2022 21/01/2022 2.00 2.00 7.00 14.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 7 40.8331 0.5 7 0 0 0 0 0 0 7 40.8331 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
737 06.01.02.05.02 S1 B ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 0.00% 91.00 18/01/2022 19/01/2022 2.00 2.00 45.50 91.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 45.5 45.5 0 91 224.8235 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
738 06.01.02.05.03 S1 B SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 336.00 16/01/2022 17/01/2022 2.00 2.00 168.00 336.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 168 168 0 0 0 336 39.2 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
739 06.01.02.06 S1 B CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
740 06.01.02.06.01 S1 B CURADO DE CONCRETO CON ANTISOL m2 0.00% 949.00 24/01/2022 26/01/2022 3.00 3.00 316.33 949.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 316.33 316.33 316.33 0 949 130.4875 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
741 06.01.02.07 S1 B SELLADO DE JUNTAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
742 06.01.02.07.01 S1 B SELLADO DE JUNTA TIPO 1 m 0.00% 95.00 18/02/2022 18/02/2022 1.00 1.00 95.00 95.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 95 0 0 0 0 0 0 95 66.50 0.99254
743 06.01.02.07.02 S1 B SELLADO DE JUNTA TIPO 2 m 0.00% 176.00 18/02/2022 18/02/2022 1.00 1.00 176.00 176.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 176 0 0 0 0 0 0 176 123.20 1.00163
744 06.01.02.07.03 S1 B SELLADO DE JUNTA TIPO 3 m 0.00% 46.00 18/02/2022 18/02/2022 1.00 1.00 46.00 46.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 46 0 0 0 0 0 0 46 32.20 1.00625
745 06.01.02.07.04 S1 B JUNTA TIPICA EN PEDESTAL m 0.00% 2.00 18/02/2022 18/02/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 2 1.05 1.05
746 06.01.03 S1 B BRUÑAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
747 06.01.03.01 S1 B BRUÑADO EN RAMPA m2 0.00% 15.00 22/01/2022 23/01/2022 2.00 2.00 7.50 15.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.5 7.5 0 0 0 0 15 9.3 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
748 06.01.04 S1 B APLICACIÓN DE GROUT E IMPERMEABILIZANTE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
749 08.02.06.01 S1 B GROUT PARA PEDESTAL E=2.5CM m2 0.00% 1.00 04/02/2022 05/02/2022 2.00 2.00 0.50 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5 0.5 0 0 0 0 0 110.93991 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
750 06.01.05 S1 B GEOMEMBRANA Y GEOTEXTIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
751 06.01.05.01 S1 B SUMINISTRO E INSTALACION GEOMEMBRANA E=1.5MM m2 0.00% 730.00 12/01/2022 13/01/2022 2.00 2.00 365.00 730.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 365 365 730 249.441 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
752 06.01.05.02 S1 B SUMINISTRO E INSTALACION GEODREN TRIPLANAR m2 0.00% 730.00 12/01/2022 13/01/2022 2.00 2.00 365.00 730.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 365 365 730 374.125 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
753 06.01.05.03 S1 B SUMINISTRO E INSTALACION GEOTEXTIL N60.1 DE 200gr/m2 m2 0.00% 50.00 12/01/2022 13/01/2022 2.00 2.00 25.00 50.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25 25 50 17.085 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
754 06.01.06 S1 B CARPINTERIA METALICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
755 06.01.06.01 S1 B SUMINISTRO E INSTALACIÓN DE GRATING 1 1/4"x1/4"x0.35m m 42.13% 26.62 16/01/2022 17/01/2022 2.00 2.00 13.31 26.62 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13.31 13.31 0 0 0 26.6 48.31037 0.58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
756 06.01.07 S1 B ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
757 06.01.07.01 S1 B MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
758 06.01.07.01.01 S1 B INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
759 06.01.07.01.01.01 S1 B ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=3/4" kg 0.00% 6.00 09/01/2022 10/01/2022 2.00 2.00 3.00 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3 0 0 0 6 1.05 1.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
760 06.01.07.01.01.02 S1 B ACERO ESTRUCTURAL PLANCHA 1/2" kg 60.00% 3.60 09/01/2022 10/01/2022 2.00 2.00 1.80 3.60 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.8 1.8 0 0 0 3.6 0.23011364 0.23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
761 06.01.07.02 S1 B INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
762 06.01.07.02.01 S1 B INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y A kg 0.00% 1.00 09/01/2022 10/01/2022 2.00 2.00 0.50 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0.5 0.5 0 0 0 1 0.08858268 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
763 07 S1 MÓDULO C: ALMACÉN TEMPORAL DE RESIDUOS BIOCONTAMINADOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
764 07.01 S1 C DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
765 03.01.03 S1 C CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
766 07.01.01.01 S1 C PEDESTAL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
767 07.01.01.01.01 S1 C COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 1.00 14/01/2022 14/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 5.8333 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
768 07.01.01.01.02 S1 C ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 0.00% 1.00 13/01/2022 13/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 2.625 0.88 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
769 07.01.01.01.03 S1 C SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 14.00 12/01/2022 12/01/2022 1.00 1.00 14.00 14.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14 0 14 1.63333333 0.82 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
770 07.01.01.02 S1 C SARDINEL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
771 07.01.01.02.01 S1 C COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 1.00 14/01/2022 14/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 5.8333 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
772 07.01.01.02.02 S1 C ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 0.00% 5.00 13/01/2022 13/01/2022 1.00 1.00 5.00 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 5 12.3529412 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
773 07.01.01.02.03 S1 C SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 30.00 12/01/2022 12/01/2022 1.00 1.00 30.00 30.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30 0 30 3.5 0.88 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
774 07.01.01.03 S1 C CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
775 07.01.01.03.01 S1 C CURADO DE CONCRETO CON ANTISOL m2 0.00% 9.00 17/01/2022 17/01/2022 1.00 1.00 9.00 9.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 0 0 0 9 1.2375 1.24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
776 07.01.02 S1 C APLICACIÓN DE GROUT E IMPERMEABILIZANTE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
777 07.01.02.01 S1 C GROUT PARA PEDESTAL E=2.5CM m2 0.00% 1.00 01/02/2022 01/02/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 10.939912 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
778 07.01.03 S1 C CARPINTERIA METALICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
779 07.01.03.01 S1 C INSTALACIÓN DE PUERTA CONTRAPLACADA REUTILIZABLE und 0.00% 1.00 01/02/2022 05/02/2022 5.00 5.00 0.20 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2 0.2 0.2 0.6 9.6 0.6 0.2 0.2 0 0 0 0 0 0.4 6.4 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
780 07.01.04 S1 C ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
781 07.01.04.01 S1 C DESMONTAJE DE ESTRUCTURAS METALICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
782 07.01.04.01.01 S1 C DESMONTAJE DE CORREAS REUTILIZABLES kg 100.00% 0.00 20/11/2021 24/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
783 07.01.04.01.02 S1 C DESMONTAJE DE TIJERALES REUTILIZABLES kg 100.00% 0.00 20/11/2021 24/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
784 07.01.04.01.03 S1 C DESMONTAJE DE VIGAS DE ARRIOSTRE REUTILIZABLES kg 100.00% 0.00 20/11/2021 24/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
785 07.01.04.01.04 S1 C DESMONTAJE DE COLUMNAS REUTILIZABLES kg 100.00% 0.00 20/11/2021 24/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
786 07.01.04.02 S1 C MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
787 07.01.04.02.01 S1 C INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS REUTILI kg 0.00% 233.00 21/01/2022 25/01/2022 5.00 5.00 46.60 233.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 46.6 46.6 46.6 46.6 46.6 0 0 233 13.40793 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
788 07.01.04.02.02 S1 C INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES REUTILIZ kg 0.00% 79.00 21/01/2022 25/01/2022 5.00 5.00 15.80 79.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15.8 15.8 15.8 15.8 15.8 0 0 79 6.056218 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
789 07.01.04.02.03 S1 C INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTR kg 0.00% 89.00 21/01/2022 25/01/2022 5.00 5.00 17.80 89.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17.8 17.8 17.8 17.8 17.8 0 0 89 5.121483 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
790 07.01.04.02.04 S1 C INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS REUTILIZA kg 0.00% 212.00 21/01/2022 25/01/2022 5.00 5.00 42.40 212.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 42.4 42.4 42.4 42.4 42.4 0 0 212 20.34115 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
791 07.01.04.03 S1 C MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
792 07.01.04.03.01 S1 C SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
793 07.01.04.03.01.01 S1 C ACERO ESTRUCTURAL PLANCHA 1/2" kg 60.00% 17.60 24/01/2022 25/01/2022 2.00 2.00 8.80 17.60 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.8 8.8 0 0 17.6 1.125 0.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
794 07.01.04.03.02 S1 C SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
795 07.01.04.03.02.01 S1 C ACERO ESTRUCTURAL PLANCHA 1/4" kg 0.87% 35.69 26/01/2022 27/01/2022 2.00 2.00 17.85 35.69 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17.845 17.845 35.7 1.642178 0.82 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
796 07.01.04.03.03 S1 C SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
797 07.01.04.03.03.01 S1 C ACERO ESTRUCTURAL ANGULO L-1 1/2"x1/8" kg 0.00% 2.00 28/01/2022 28/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 2 0 0 0 0 0 0 2 0.230179 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
798 07.01.04.03.04 S1 C SUMINISTRO, INSTALACIÓN DE PANELES DE MALLA GALVANIZADA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
799 07.01.04.03.04.01 S1 C ACERO ESTRUCTURAL ANGULO L-2"x1/8" kg 0.00% 6.00 29/01/2022 30/01/2022 2.00 2.00 3.00 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3 0 0 0 0 6 0.6905371 0.69 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
800 07.01.04.03.04.02 S1 C ACERO ESTRUCTURAL ANGULO L-1 1/2"x1/8" kg 59.59% 56.16 29/01/2022 30/01/2022 2.00 2.00 28.08 56.16 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 28.08 28.08 0 0 0 0 56.2 6.4634271 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
801 07.01.04.03.04.03 S1 C ACERO ESTRUCTURAL ANGULO L - 1"x1"x1/8" kg 60.00% 5.60 29/01/2022 30/01/2022 2.00 2.00 2.80 5.60 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.8 2.8 0 0 0 0 5.6 0.6445013 0.32 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
802 07.01.04.03.04.04 S1 C ACERO ESTRUCTURAL PLATINA 1/8"x1 1/4" kg 0.00% 2.00 29/01/2022 30/01/2022 2.00 2.00 1.00 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 1 1 0 0 0 0 2 0.2556818 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
803 07.01.04.03.04.05 S1 C MALLA GALVANIZADA #8 - 2"x2" kg 60.00% 17.60 29/01/2022 30/01/2022 2.00 2.00 8.80 17.60 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.8 8.8 0 0 0 0 17.6 4.1191489 0.41 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
804 07.01.04.03.05 S1 C SUMINISTRO, INSTALACIÓN DE COBERTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
805 07.01.04.03.05.01 S1 C SUMINISTRO, INSTALACIÓN COBERTURA TR-4, E=0.5mm m2 59.66% 13.72 31/01/2022 31/01/2022 1.00 1.00 13.72 13.72 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13.72 0 0 0 13.7 5.9453333 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
806 07.01.04.04 S1 C INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
807 07.01.04.04.01 S1 C INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y A kg 0.00% 43.00 28/01/2022 28/01/2022 1.00 1.00 43.00 43.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 43 0 0 0 0 0 0 43 3.8090551 0.95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
808 07.01.04.05 S1 C LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
809 07.01.04.05.01 S1 C LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 0.00% 28.00 28/01/2022 01/02/2022 5.00 5.00 5.60 28.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.6 5.6 5.6 5.6 5.6 0 0 28 14 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
810 07.01.04.06 S1 C PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
811 07.01.04.06.01 S1 C PINTURA DE ELEMENTOS METALICOS m2 100.00% 0.00 26/11/2021 30/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
812 07.01.04.07 S1 C TRANSPORTE DE ELEMENTOS ESTRUCTURALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
813 07.01.04.07.01 S1 C TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 100.00% 0.00 13/11/2021 19/11/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
814 07.02 S1 C DISCIPLINA: INSTALACIONES ELÉCTRICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
815 07.02.01 S1 C SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
816 07.02.01.01 S1 C ARTEFACTO DE ALUMBRADO LITHONIA LIGHTING FEM L48 8000LM LPPF pto 0.00% 2.00 29/01/2022 03/02/2022 6.00 6.00 0.33 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3333 0.3333 0.3333 0.3333 0.3333 0.3333 2 14.56 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
817 07.02.01.02 S1 C SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE pto 0.00% 1.00 29/01/2022 03/02/2022 6.00 6.00 0.17 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1667 0.1667 0.1667 0.1667 0.1667 0.1667 1 2.9333 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
818 07.02.01.03 S1 C SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON 1286W pto 0.00% 1.00 29/01/2022 03/02/2022 6.00 6.00 0.17 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1667 0.1667 0.1667 0.1667 0.1667 0.1667 1 1.76 0.88 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
819 07.02.01.04 S1 C SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON 5462- pto 0.00% 2.00 29/01/2022 03/02/2022 6.00 6.00 0.33 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3333 0.3333 0.3333 0.3333 0.3333 0.3333 2 3.52 0.88 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
820 07.02.01.05 S1 C SUMINISTRO Y MONTAJE DE TOMACORRIENTE INDUSTRIAL TRIFÁSICO pto 0.00% 1.00 29/01/2022 03/02/2022 6.00 6.00 0.17 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1667 0.1667 0.1667 0.1667 0.1667 0.1667 1 5.6 0.93 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
821 07.02.02 S1 C TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
822 07.02.02.01 S1 C SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1133 UND 0.00% 1.00 29/01/2022 03/02/2022 6.00 6.00 0.17 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1667 0.1667 0.1667 0.1667 0.1667 0.1667 1 90.909 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
823 07.02.03 S1 C CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
824 07.02.03.01 S1 C SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 1"Ø m 0.00% 9.00 29/01/2022 03/02/2022 6.00 6.00 1.50 9.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.5 1.5 1.5 1.5 1.5 1.5 9 7.3989 1.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
825 07.02.03.02 S1 C SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 32.00 29/01/2022 03/02/2022 6.00 6.00 5.33 32.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.3333 5.3333 5.3333 5.3333 5.3333 5.3333 32 28.8928 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
826 07.02.04 S1 C CONDUCTORES Y CABLES DE ENERGIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
827 07.02.04.01 S1 C SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW M 0.00% 23.00 29/01/2022 03/02/2022 6.00 6.00 3.83 23.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.8333 3.8333 3.8333 3.8333 3.8333 3.8333 23 6.6378 0.95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
828 07.02.04.02 S1 C SUMINISTRO E INSTALACIÓN DE CABLE 2-1/c #12 AWG + GRD; XHHW-2, 0 M 0.00% 17.00 29/01/2022 03/02/2022 6.00 6.00 2.83 17.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.8333 2.8333 2.8333 2.8333 2.8333 2.8333 17 4.9062 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
829 07.02.04.03 S1 C SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #12 AWG + GRD, XHHW-2, 0 m 0.00% 11.00 29/01/2022 03/02/2022 6.00 6.00 1.83 11.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.8333 1.8333 1.8333 1.8333 1.8333 1.8333 11 11 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
830 07.02.05 S1 C EQUIPOS ELÉCTRICOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
831 07.02.05.01 S1 C INSTALACIÓN DE EQUIPO 1 AUTOCLAVE 10 KW 400 V TRIFÁSICO EN und 0.00% 1.00 29/01/2022 03/02/2022 6.00 6.00 0.17 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1667 0.1667 0.1667 0.1667 0.1667 0.1667 1 62 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
832 08 S1 D MÓDULO D: ALMACÉN TEMPORAL DE RESIDUOS PELIGROSOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
833 08.01 S1 D DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
834 08.01.01 S1 D MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
835 08.01.01.01 S1 D EXCAVACION P/ZAPATAS m3 100.00% 0.00 13.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
836 08.01.01.02 S1 D EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 0.00 23/12/2021 23/12/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
837 08.01.01.03 S1 D REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.00 13.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
838 08.01.01.04 S1 D TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.00 30.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
839 08.01.01.05 S1 D TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 100.00% 0.00 30.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
840 08.01.01.06 S1 D RELLENO CON MATERIAL PROPIO SELECCIONADO m3 100.00% 0.00 30.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
841 08.01.01.07 S1 D MEJORAMIENTO CON MATERIAL GRANULAR m3 100.00% 0.00 30.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
842 08.01.01.08 S1 D ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.00 30.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
843 08.01.01.09 S1 D ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.00 30.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
844 08.01.01.10 S1 D APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.00 30.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
845 05.01.03 S1 D CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
846 08.01.02.01 S1 D CONCRETO SIMPLE PARA ZAPATAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
847 08.01.02.01.01 S1 D COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
848 08.01.02.02 S1 D CONCRETO SIMPLE PARA LOSAS DE EQUIPOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
849 08.01.02.02.01 S1 D COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 2.00 27/12/2021 27/12/2021 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 2 0 0 0 2 11.6666 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
850 08.01.02.02.02 S1 D ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA PARA EQUIPOS m2 0.00% 3.00 26/12/2021 26/12/2021 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 3 0 0 0 0 3 7.4117647 1.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
851 08.01.02.03 S1 D CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
852 08.01.02.03.01 S1 D CURADO DE CONCRETO CON ANTISOL m2 0.00% 22.00 31/12/2021 02/01/2022 3.00 3.00 7.33 22.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 7.3333 7.3333 7.3333 0 0 0 0 22 3.025 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
853 06.01.02 S1 B CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
854 08.01.03.01 S1 D ZAPATAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
855 08.01.03.01.01 S1 D COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 Err:507 Err:507 1.00Err:507 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
856 08.01.03.01.02 S1 D SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 Err:507 Err:507 1.00Err:507 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
857 08.01.03.02 S1 D PEDESTAL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
858 08.01.03.02.01 S1 D COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 Err:507 Err:507 1.00Err:507 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
859 08.01.03.02.02 S1 D ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 100.00% 0.00 Err:507 Err:507 1.00Err:507 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
860 08.01.03.02.03 S1 D SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 Err:507 Err:507 1.00Err:507 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
861 08.01.03.03 S1 D LOSA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
862 08.01.03.03.01 S1 D COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 21/12/2021 22/12/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
863 08.01.03.03.02 S1 D ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 0.00 16/12/2021 20/12/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
864 08.01.03.03.03 S1 D SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 16/12/2021 20/12/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
865 08.01.03.04 S1 D RAMPA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
866 08.01.03.04.01 S1 D COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 9.00 14/01/2022 14/01/2022 1.00 1.00 9.00 9.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 0 0 0 0 0 0 9 52.4997 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
867 08.01.03.04.02 S1 D ENCOFRADO CARAVISTA Y DESENCOFRADO DE RAMPA m2 0.00% 9.00 13/01/2022 13/01/2022 1.00 1.00 9.00 9.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 9 22.2352941 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
868 08.01.03.04.03 S1 D SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 66.27% 110.62 12/01/2022 12/01/2022 1.00 1.00 110.62 110.62 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 110.62 0 110.62 12.9056667 0.34 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
869 08.01.03.05 S1 D CANAL DE DRENAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
870 08.01.03.05.01 S1 D COLOCACIÓN DE CONCRETO F'c=30 MPa m3 25.00% 6.00 19/01/2022 20/01/2022 2.00 2.00 3.00 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3 6 34.9998 0.74 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
871 08.01.03.05.02 S1 D ENCOFRADO CARAVISTA Y DESENCOFRADO DE CANAL DE DRENAJE m2 34.48% 19.00 17/01/2022 18/01/2022 2.00 2.00 9.50 19.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9.5 9.5 0 0 19 53.2 0.66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
872 08.01.03.05.03 S1 D SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 48.73% 247.64 15/01/2022 16/01/2022 2.00 2.00 123.82 247.64 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 123.82 123.82 0 0 0 0 248 28.89133 0.52 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
873 08.01.03.06 S1 D ALCANTARILLA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
874 08.01.03.06.01 S1 D COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 1.00 23/01/2022 23/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 5.8333 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
875 08.01.03.06.02 S1 D ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 1.00 22/01/2022 22/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 2.4706 1.24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
876 08.01.03.06.03 S1 D SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 21/01/2022 21/01/2022 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
877 08.01.03.07 S1 D SARDINEL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
878 08.01.03.07.01 S1 D COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 12.00 22/12/2021 23/12/2021 2.00 2.00 6.00 12.00 X X 0 0 0 0 0 6 6 12 70.00 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
879 08.01.03.07.02 S1 D ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 0.00% 86.00 20/12/2021 21/12/2021 2.00 2.00 43.00 86.00 X X 0 0 0 43 43 0 0 86 212.47 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
880 08.01.03.07.03 S1 D SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 56.95% 132.16 18/12/2021 19/12/2021 2.00 2.00 66.08 132.16 X X 0 66.08 66.08 0 0 0 0 132 15.42 0.43 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
881 08.01.03.08 S1 D CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
882 08.01.03.08.01 S1 D CURADO DE CONCRETO CON ANTISOL m2 23.95% 470.76 24/01/2022 26/01/2022 3.00 3.00 156.92 470.76 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 156.92 156.92 156.92 0 471 64.7295 0.76 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
883 08.01.03.09 S1 D SELLADO DE JUNTAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
884 08.01.03.09.01 S1 D SELLADO DE JUNTA TIPO 1 m 0.00% 66.00 19/01/2022 20/01/2022 2.00 2.00 33.00 66.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 33 33 66 46.2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
885 08.01.03.09.02 S1 D SELLADO DE JUNTA TIPO 2 m 0.00% 70.00 19/01/2022 20/01/2022 2.00 2.00 35.00 70.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35 35 70 49 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
886 08.01.03.09.03 S1 D SELLADO DE JUNTA TIPO 3 m 0.00% 18.00 19/01/2022 20/01/2022 2.00 2.00 9.00 18.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 9 18 12.6 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
887 08.01.03.09.04 S1 D JUNTA TIPICA EN PEDESTAL m 0.00% 36.00 19/01/2022 20/01/2022 2.00 2.00 18.00 36.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18 18 36 18.9 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
888 08.01.04 S1 D BRUÑAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
889 08.01.04.01 S1 D BRUÑADO EN RAMPA m2 0.00% 35.00 14/01/2022 14/01/2022 1.00 1.00 35.00 35.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35 0 0 0 0 0 0 35 21.7 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
890 08.01.05 S1 D APLICACIÓN DE GROUT E IMPERMEABILIZANTE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
891 08.01.05.01 S1 D GROUT PARA PEDESTAL E=2.5CM m2 0.00% 4.00 14/01/2022 16/01/2022 3.00 3.00 1.33 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.3333 1.3333 1.3333 0 0 0 0 4 43.75965 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
892 08.01.06 S1 D CARPINTERIA METALICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
893 08.01.06.01 S1 D SUMINISTRO E INSTALACIÓN DE PUERTA CORREDIZA P03 INC. RIEL S und 0.00% 1.00 21/01/2022 23/01/2022 3.00 3.00 0.33 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3333 0.3333 0.3333 0 0 0 0 1 32 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
894 08.01.06.02 S1 D SUMINISTRO E INSTALACIÓN DE PUERTA CORREDIZA P04 INC. RIEL S und 60.00% 0.40 21/01/2022 23/01/2022 3.00 3.00 0.13 0.40 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1333 0.1333 0.1333 0 0 0 0 0.4 12.8 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
895 08.01.06.03 S1 D SUMINISTRO E INSTALACIÓN DE PUERTA CORREDIZA P05 INC. RIEL S und 60.00% 0.40 21/01/2022 23/01/2022 3.00 3.00 0.13 0.40 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1333 0.1333 0.1333 0 0 0 0 0.4 24.8 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
896 08.01.06.04 S1 D SUMINISTRO E INSTALACIÓN DE PUERTA CORREDIZA P06 INC. RIEL S und 60.00% 0.40 21/01/2022 23/01/2022 3.00 3.00 0.13 0.40 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1333 0.1333 0.1333 0 0 0 0 0.4 16.8 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
897 08.01.06.05 S1 D SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.50m m 58.70% 14.87 21/01/2022 23/01/2022 3.00 3.00 4.96 14.87 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.9567 4.9567 4.9567 0 0 0 0 14.9 40.47944 0.41 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
898 08.01.07 S1 D ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
899 08.01.07.01 S1 D MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
900 08.01.07.01.01 S1 D SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
901 08.01.07.01.01.01 S1 D ACERO ESTRUCTURAL PERFIL W 8x40 lb/ft kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
902 08.01.07.01.01.02 S1 D ACERO ESTRUCTURAL PERFIL W 8x24 lb/ft kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
903 08.01.07.01.01.03 S1 D ACERO ESTRUCTURAL PERFIL W 6x25 lb/ft kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
904 08.01.07.01.01.04 S1 D ACERO ESTRUCTURAL PLANCHA 3/4" kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
905 08.01.07.01.02 S1 D SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
906 08.01.07.01.02.01 S1 D ACERO ESTRUCTURAL PERFIL W 8x40 lb/ft kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
907 08.01.07.01.02.02 S1 D ACERO ESTRUCTURAL PERFIL W 6x25 lb/ft kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
908 08.01.07.01.02.03 S1 D ACERO ESTRUCTURAL PLANCHA 5/8" kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
909 08.01.07.01.02.04 S1 D ACERO ESTRUCTURAL PLANCHA 1/2" kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
910 08.01.07.01.02.05 S1 D ACERO ESTRUCTURAL PLANCHA 3/8" kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
911 08.01.07.01.03 S1 D SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
912 08.01.07.01.03.01 S1 D ACERO ESTRUCTURAL PERFIL W 8x40 lb/ft kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
913 08.01.07.01.03.02 S1 D ACERO ESTRUCTURAL PERFIL W 8x13 lb/ft kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
914 08.01.07.01.03.03 S1 D ACERO ESTRUCTURAL PERFIL W6x25 lb/ft kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
915 08.01.07.01.03.04 S1 D ACERO ESTRUCTURAL PERFIL W6x15 lb/ft kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
916 08.01.07.01.03.05 S1 D ACERO ESTRUCTURAL TUBO 4"x4"x7.9mm kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
917 08.01.07.01.03.06 S1 D ACERO ESTRUCTURAL PLANCHA 1/2" kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
918 08.01.07.01.03.07 S1 D ACERO ESTRUCTURAL PLANCHA 1/4" kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
919 08.01.07.01.04 S1 D SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
920 08.01.07.01.04.01 S1 D ACERO ESTRUCTURAL PERFIL C 6"x2"x1/8" kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
921 08.01.07.01.04.02 S1 D ACERO ESTRUCTURAL ANGULO 5"x5"x3/8" kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
922 08.01.07.01.05 S1 D SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL DIAGONALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
923 08.01.07.01.05.01 S1 D ACERO ESTRUCTURAL TUBO 2"x2"x3mm kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
924 08.01.07.01.05.02 S1 D ACERO ESTRUCTURAL PLANCHA 3/8" kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
925 08.01.07.01.05.03 S1 D ACERO ESTRUCTURAL PLANCHA 1/4" kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
926 08.01.07.01.06 S1 D SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
927 08.01.07.01.06.01 S1 D ACERO ESTRUCTURAL FIERRO LISO Ø5/8" kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
928 08.01.07.01.07 S1 D SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VENTANAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
929 08.01.07.01.07.01 S1 D ACERO ESTRUCTURAL ANGULO 2"x2"x1/8" kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
930 08.01.07.01.07.02 S1 D ACERO ESTRUCTURAL PLANCHA 3/8" kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
931 08.01.07.01.07.03 S1 D ACERO ESTRUCTURAL ANGULO 1 1/2"x1 1/2"x1/8" kg 100.00% 0.00 3.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
932 08.01.07.01.08 S1 D SUMINISTRO, INSTALACIÓN DE COBERTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
933 08.01.07.01.08.01 S1 D SUMINISTRO, INSTALACIÓN COBERTURA TR-4 m2 100.00% 0.00 26/11/2021 02/12/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
934 08.01.07.01.08.02 S1 D SUMINISTRO, INSTALACIÓN COBERTURA TR-4 TRANSLUCIDO m2 100.00% 0.00 26/11/2021 02/12/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
935 08.01.07.01.09 S1 D SUMINISTRO, INSTALACIÓN DE CERRAMIENTO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
936 08.01.07.01.09.01 S1 D SUMINISTRO, INSTALACIÓN CERRAMIENTO TR-4 m2 70.00% 151.80 31/12/2021 13/01/2022 14.00 14.00 10.84 151.80 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 10.843 10.843 10.843 10.843 10.843 10.843 10.843 75.9 32.89 0.15 10.843 10.843 10.843 10.843 10.843 10.843 10.843 75.9 32.89 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
937 08.01.07.01.10 S1 D SUMINISTRO, INSTALACIÓN DE CUMBRERA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
938 08.01.07.01.10.01 S1 D SUMINISTRO, INSTALACIÓN DE CUMBRERA TR-4 m 100.00% 0.00 03/12/2021 05/12/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
939 08.01.07.01.11 S1 D SUMINISTRO, INSTALACIÓN DE ESQUINEROS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
940 08.01.07.01.11.01 S1 D SUMINISTRO, INSTALACIÓN ESQUINEROS TR-4 m 57.65% 14.40 14/01/2022 16/01/2022 3.00 3.00 4.80 14.40 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.8 4.8 4.8 0 0 0 0 14.4 2.425263 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
941 08.01.07.01.12 S1 D SUMINISTRO, INSTALACIÓN REMATES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
942 08.01.07.01.12.01 S1 D SUMINISTRO, INSTALACIÓN REMATES TR-4 m 65.28% 17.71 14/01/2022 16/01/2022 3.00 3.00 5.90 17.71 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.9033 5.9033 5.9033 0 0 0 0 17.7 2.982737 0.33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
943 08.01.07.01.13 S1 D INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
944 08.01.07.01.13.01 S1 D ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=3/4" kg 100.00% 0.00 14/01/2022 14/01/2022 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
945 08.01.07.02 S1 D INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
946 08.01.07.02.01 S1 D INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y A kg 50.00% 583.50 14/01/2022 14/01/2022 1.00 1.00 583.50 583.50 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 583.5 0 0 0 0 0 0 584 51.68799 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
947 08.01.07.03 S1 D PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
948 08.01.07.03.01 S1 D PINTURA DE ELEMENTOS METALICOS m2 60.00% 538.40 14/01/2022 14/01/2022 1.00 1.00 538.40 538.40 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 538.4 0 0 0 0 0 0 538 235.55 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
949 08.02 S1 D DISCIPLINA: INSTALACIONES SANITARIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
950 08.02.01 S1 D TUBERIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
951 08.02.01.01 S1 D MONTANTE DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
952 08.02.01.01.01 S1 D 975-SD-4"-P0E03U-10001 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
953 08.02.01.01.01.01 S1 D Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 15.00 15/01/2022 21/01/2022 7.00 7.00 2.14 15.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.1429 2.1429 2.1429 2.1429 2.1429 2.1429 12.9 7.842857 0.87 2.1429 0 0 0 0 0 0 2.14 1.307143 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
954 08.02.01.01.01.02 S1 D El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 15/01/2022 21/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.86 0 ### 0.1429 0 0 0 0 0 0 0.14 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
955 08.02.01.01.02 S1 D 975-SD-4"-P0E03U-10002 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
956 08.02.01.01.02.01 S1 D Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 10.00 15/01/2022 21/01/2022 7.00 7.00 1.43 10.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.4286 1.4286 1.4286 1.4286 1.4286 1.4286 8.57 7.842857 0.87 1.4286 0 0 0 0 0 0 1.43 1.307143 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
957 08.02.01.01.02.02 S1 D El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 15/01/2022 21/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.86 0 ### 0.1429 0 0 0 0 0 0 0.14 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
958 08.02.01.01.03 S1 D 975-SD-4"-P0E03U-100027 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
959 08.02.01.01.03.01 S1 D Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 8.00 15/01/2022 21/01/2022 7.00 7.00 1.14 8.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.1429 1.1429 1.1429 1.1429 1.1429 1.1429 6.86 7.842857 0.87 1.1429 0 0 0 0 0 0 1.14 1.307143 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
960 08.02.01.01.03.02 S1 D El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 15/01/2022 21/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.86 0 ### 0.1429 0 0 0 0 0 0 0.14 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
961 08.02.01.01.04 S1 D 975-SD-4"-P0E03U-100028 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
962 08.02.01.01.04.01 S1 D Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 13.00 15/01/2022 21/01/2022 7.00 7.00 1.86 13.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.8571 1.8571 1.8571 1.8571 1.8571 1.8571 11.1 7.842857 0.87 1.8571 0 0 0 0 0 0 1.86 1.307143 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
963 08.02.01.01.04.02 S1 D El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 15/01/2022 21/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.86 0 ### 0.1429 0 0 0 0 0 0 0.14 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
964 08.02.02 S1 D MECÁNICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
965 08.02.02.01 S1 D CANALETAS DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
966 08.02.02.01.01 S1 D ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 0.00% 63.00 15/01/2022 21/01/2022 7.00 7.00 9.00 63.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 9 9 9 9 9 54 20.17857 0.84 9 0 0 0 0 0 0 9 3.363095 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
967 08.02.02.01.02 S1 D ACERO ESTRUCTURAL PLANCHA FIERRO GALVANIZADO E=0.8 MM kg 0.00% 502.00 15/01/2022 21/01/2022 7.00 7.00 71.71 502.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 71.714 71.714 71.714 71.714 71.714 71.714 430 161.4286 0.86 71.714 0 0 0 0 0 0 71.7 26.90476 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
968 08.02.02.02 S1 D SOPORTERIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
969 08.02.02.02.01 S1 D GS1-4", Tubería 975-SD-4"-P0E03U-10001,10002,100027 & 100028 pza 0.00% 20.00 15/01/2022 21/01/2022 7.00 7.00 2.86 20.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.8571 2.8571 2.8571 2.8571 2.8571 2.8571 17.1 51.42857 0.86 2.8571 0 0 0 0 0 0 2.86 8.571429 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
970 08.03 S1 D DISCIPLINA: INSTALACIONES ELÉCTRICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
971 08.03.01 S1 D SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
972 08.03.01.01 S1 D SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE P pto 0.00% 14.00 29/01/2022 04/02/2022 7.00 7.00 2.00 14.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 2 2 2 12 72.7992 0.86 2 0 0 0 0 0 0 2 12.1332 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
973 08.03.01.02 S1 D SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE pto 0.00% 3.00 29/01/2022 04/02/2022 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 2.57 15.599829 0.87 0.4286 0 0 0 0 0 0 0.432.599971 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
974 08.03.01.03 S1 D SUMINISTRO Y MONTAJE DE INTERRUPTOR DOBLE LEVINTON WATHER pto 0.00% 1.00 29/01/2022 04/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.86 1.5085714 0.75 0.1429 0 0 0 0 0 0 0.140.251429 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
975 08.03.01.04 S1 D SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON WAT pto 0.00% 5.00 29/01/2022 04/02/2022 7.00 7.00 0.71 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7143 0.7143 0.7143 0.7143 0.7143 0.7143 4.29 18.857143 0.86 0.7143 0 0 0 0 0 0 0.713.142857 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
976 08.03.01.05 S1 D SUMINISTRO Y MONTAJE DE TOMACORRIENTE INDUSTRIAL MONOFÁSI pto 0.00% 1.00 29/01/2022 04/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.86 4.8 0.8 0.1429 0 0 0 0 0 0 0.14 0.8 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
977 08.03.02 S1 D TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
978 08.03.02.01 S1 D SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1155 UND 0.00% 1.00 29/01/2022 04/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.86 77.150571 0.86 0.1429 0 0 0 0 0 0 0.1412.85843 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
979 08.03.02.02 S1 D SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-COA-958 und 0.00% 1.00 29/01/2022 04/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.86 51.428571 0.86 0.1429 0 0 0 0 0 0 0.148.571429 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
980 08.03.02.03 S1 D SUMINISTRO Y MONTAJE DE TRANSFORMADOR 975-XFZ-1073 und 0.00% 1.00 29/01/2022 04/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.86 17.142857 0.86 0.1429 0 0 0 0 0 0 0.142.857143 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
981 08.03.02.04 S1 D SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE 230
UND 0.00% 6.00 29/01/2022 04/02/2022 7.00 7.00 0.86 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.8571 0.8571 0.8571 0.8571 0.8571 0.8571 5.14 7.0801714 0.89 0.8571 0 0 0 0 0 0 0.861.180029 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
982 08.03.03 S1 D CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
983 08.03.03.01 S1 D SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 244.00 29/01/2022 04/02/2022 7.00 7.00 34.86 244.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 34.857 34.857 34.857 34.857 34.857 34.857 209 188.83509 0.86 34.857 0 0 0 0 0 0 34.931.47251 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
984 08.03.03.02 S1 D SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 1"Ø m 0.00% 67.00 29/01/2022 04/02/2022 7.00 7.00 9.57 67.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9.5714 9.5714 9.5714 9.5714 9.5714 9.5714 57.4 47.212029 0.86 9.5714 0 0 0 0 0 0 9.577.868671 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
985 08.03.03.03 S1 D SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 1 1/2"Ø m 0.00% 3.00 29/01/2022 04/02/2022 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 2.57 3.0515143 0.76 0.4286 0 0 0 0 0 0 0.430.508586 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
986 08.03.03.04 S1 D SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 10.00 29/01/2022 04/02/2022 7.00 7.00 1.43 10.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.4286 1.4286 1.4286 1.4286 1.4286 1.4286 8.57 7.7391429 0.86 1.4286 0 0 0 0 0 0 1.431.289857 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
987 08.03.03.05 S1 D SUMINISTRO E INSTALACIÓN DE TUBERIA FLEXIBLE Y ACCESORIOS RGS m 0.00% 1.00 29/01/2022 04/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.86 0.9029143 0.9 0.1429 0 0 0 0 0 0 0.140.150486 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
988 08.03.03.06 S1 D SUMINISTRO E INSTALACIÓN DE BANDEJA ESCALERILLA 450X150MM m 0.00% 31.00 29/01/2022 04/02/2022 7.00 7.00 4.43 31.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.4286 4.4286 4.4286 4.4286 4.4286 4.4286 26.6 43.927886 0.86 4.4286 0 0 0 0 0 0 4.437.321314 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
989 08.03.04 S1 D CONDUCTORES Y CABLES DE ENERGIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
990 08.03.04.01 S1 D SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #4 AWG + GRD; XHHW-2, 0. M 0.00% 2.00 08/02/2022 14/02/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2857 0.2857 0.2857 0.860.247371 0.25 0.2857 0.2857 0.2857 0.2857 0 0 0 1.14 0.32983 0.33 0 0 0 0 0 0 0 0 - 0
991 08.03.04.02 S1 D SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #8 AWG + GRD; XHHW-2, 0. M 0.00% 4.00 08/02/2022 14/02/2022 7.00 7.00 0.57 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5714 0.5714 0.5714 1.710.494743 0.49 0.5714 0.5714 0.5714 0.5714 0 0 0 2.29 0.65966 0.66 0 0 0 0 0 0 0 0 - 0
992 08.03.04.03 S1 D SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #10 AWG + GRD; XHHW-2, 0 M 0.00% 279.00 08/02/2022 14/02/2022 7.00 7.00 39.86 279.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 39.857 39.857 39.857 12034.50831 0.43 39.857 39.857 39.857 39.857 0 0 0 159 46.0111 0.57 0 0 0 0 0 0 0 0 - 0
993 08.03.04.04 S1 D SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #12 AWG + GRD; XHHW-2, 0 M 0.00% 281.00 08/02/2022 14/02/2022 7.00 7.00 40.14 281.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 40.143 40.143 40.143 120120.4286 0.43 40.143 40.143 40.143 40.143 0 0 0 161 160.571 0.57 0 0 0 0 0 0 0 0 - 0
994 08.03.04.05 S1 D SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #12 AWG + GRD, XHHW-2, 0 m 0.00% 157.00 08/02/2022 14/02/2022 7.00 7.00 22.43 157.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22.429 22.429 22.429 67.367.28571 0.43 22.429 22.429 22.429 22.429 0 0 0 89.7 89.7143 0.57 0 0 0 0 0 0 0 0 - 0
995 08.03.05 S1 D EQUIPOS ELÉCTRICOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
996 08.03.05.01 S1 D INSTALACIÓN DE EQUIPO LAVADORA INDUSTRIAL 5.59 KW 400 V TR und 0.00% 2.00 15/02/2022 21/02/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2857 0.2857 0.2857 0.86 53.1429 0.43 0.2857 0.2857 0.2857 0.2857 0 0 0 1.14 70.86 0.57143
997 08.03.05.02 S1 D INSTALACIÓN DE EQUIPO SECADORA INDUSTRIAL 2.24 KW 220 V TR und 0.00% 2.00 15/02/2022 21/02/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2857 0.2857 0.2857 0.86 53.1429 0.43 0.2857 0.2857 0.2857 0.2857 0 0 0 1.14 70.86 0.57143
998 08.03.05.03 S1 D ENFARDADOR VERTICAL 4.1 KW 380 V TRIFASICO EN ALMACEN DE RE und 0.00% 1.00 15/02/2022 21/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 7.59184 0.42 0.1429 0.1429 0.1429 0.1429 0 0 0 0.57 10.12 0.56236
999 08.03.05.04 S1 D INSTALACIÓN DE EQUIPO 1 COMPACTADORA DE FILTROS 11.19 KW 2 und 0.00% 1.00 15/02/2022 21/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 8.17581 0.43 0.1429 0.1429 0.1429 0.1429 0 0 0 0.57 10.90 0.57374
1000 08.03.05.05 S1 D INSTALACIÓN DE EQUIPO 1 TRITURADOR DE FLUORESCENTES 2.24 und 0.00% 1.00 15/02/2022 21/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 4.42856 0.44 0.1429 0.1429 0.1429 0.1429 0 0 0 0.57 5.90 0.59047
1001 08.03.06 S1 D EQUIPOS MECÁNICOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1002 08.03.06.01 S1 D MONTAJE DE EXTRACTOR EÓLICO DE 20" REUTILIZABLE und 0.00% 5.00 15/02/2022 21/02/2022 7.00 7.00 0.71 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7143 0.7143 0.7143 2.14 27.4286 0.43 0.7143 0.7143 0.7143 0.7143 0 0 0 2.86 36.57 0.57143
1003 08.03.06.02 S1 D SUMINISTRO Y MONTAJE DE EXTRACTOR EÓLICO DE 20" und 0.00% 2.00 15/02/2022 21/02/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2857 0.2857 0.2857 0.86 9.14286 0.44 0.2857 0.2857 0.2857 0.2857 0 0 0 1.14 12.19 0.5805
1004 08.03.06.03 S1 D INSTALACION DE EQUIPO 1 DESPRESURIZADOR DE AEROSOLES und 0.00% 1.00 15/02/2022 21/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 3.14286 0.45 0.1429 0.1429 0.1429 0.1429 0 0 0 0.57 4.19 0.59864
1005 09 S1 MÓDULO E: RAMPA DE DESCARGA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1006 09.01 S1 E DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1007 09.01.01 S1 E MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1008 09.01.01.01 S1 E EXCAVACION MASIVA CON EQUIPO m3 100.00% 0.00 12/11/2021 18/11/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1009 09.01.01.02 S1 E EXCAVACION P/ZAPATAS m3 100.00% 0.00 27.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1010 09.01.01.03 S1 E EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 0.00% 2.00 23/12/2021 23/12/2021 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 2 2 12.40 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1011 09.01.01.04 S1 E REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.00 10/12/2021 16/12/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1012 09.01.01.05 S1 E TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.00 19/11/2021 25/11/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1013 09.01.01.06 S1 E TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 100.00% 0.00 19/11/2021 25/11/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1014 09.01.01.07 S1 E RELLENO CON MATERIAL PROPIO SELECCIONADO m3 51.80% 14.46 24/01/2022 30/01/2022 7.00 7.00 2.07 14.46 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.0657 2.0657 2.0657 2.0657 8.26 29.33314 0.27 2.0657 2.0657 2.0657 0 0 0 0 6.2 21.999857 0.21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1015 09.01.01.08 S1 E MEJORAMIENTO CON MATERIAL GRANULAR m3 12.00% 45.76 24/01/2022 30/01/2022 7.00 7.00 6.54 45.76 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.5371 6.5371 6.5371 6.5371 26.1 16.21211 0.51 6.5371 6.5371 6.5371 0 0 0 0 19.6 12.159086 0.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1016 09.01.01.09 S1 E ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.00 12/11/2021 18/11/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1017 09.01.01.10 S1 E ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.00 12/11/2021 18/11/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1018 09.01.01.11 S1 E APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.00 15/11/2021 21/11/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1019 07.01.01 S1 C CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1020 09.01.02.01 S1 E CONCRETO SIMPLE PARA ZAPATAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1021 09.01.02.01.01 S1 E COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1022 08.01.03 S1 D CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1023 09.01.03.01 S1 E ZAPATAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1024 09.01.03.01.01 S1 E COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1025 09.01.03.01.02 S1 E SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1026 09.01.03.02 S1 E PEDESTAL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1027 09.01.03.02.01 S1 E COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1028 09.01.03.02.02 S1 E ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1029 09.01.03.02.03 S1 E SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1030 09.01.03.03 S1 E LOSA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1031 09.01.03.03.01 S1 E COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 90.00 27/12/2021 03/01/2022 8.00 8.00 11.25 90.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 11.25 11.25 11.25 11.25 45 262.4985 0.5 11.25 11.25 11.25 11.25 0 0 0 45 262.4985 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1032 09.01.03.03.02 S1 E ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 0.00% 36.00 23/12/2021 28/12/2021 6.00 6.00 6.00 36.00 X X 0 0 0 0 0 0 6 6 14.82 0.17 6 6 6 6 6 0 0 30 74.117647 0.83 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1033 09.01.03.03.03 S1 E SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 63.96% 2,230.42 23/12/2021 26/12/2021 4.00 4.00 557.61 2230.42 X X 0 0 0 0 0 0 557.61 558 65.05 0.09 557.61 557.61 557.61 0 0 0 0 1673 195.16175 0.27 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1034 09.01.03.04 S1 E MUROS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1035 09.01.03.04.01 S1 E COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 25.00 14/01/2022 21/01/2022 8.00 8.00 3.13 25.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.125 3.125 3.125 3.125 3.125 3.125 3.125 21.9 127.6034 0.87 3.125 0 0 0 0 0 0 3.13 18.22906 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1036 09.01.03.04.02 S1 E ENCOFRADO CARAVISTA Y DESENCOFRADO DE MURO m2 0.00% 179.00 08/01/2022 13/01/2022 6.00 6.00 29.83 179.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 29.833 29.833 29.833 29.833 29.833 29.833 179 626.5 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1037 09.01.03.04.03 S1 E SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 58.96% 642.26 04/01/2022 07/01/2022 4.00 4.00 160.57 642.26 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 160.57 160.57 160.57 482 56.19775 0.31 160.57 0 0 0 0 0 0 160.57 18.7325833 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1038 09.01.03.05 S1 E CANAL DE DRENAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1039 09.01.03.05.01 S1 E COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 1.00 24/01/2022 24/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 5.8333 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1040 09.01.03.05.02 S1 E ENCOFRADO CARAVISTA Y DESENCOFRADO DE CANAL DE DRENAJE m2 0.00% 3.00 23/01/2022 23/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 3 8.4 1.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1041 09.01.03.05.03 S1 E SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 68.00 22/01/2022 22/01/2022 1.00 1.00 68.00 68.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 68 0 0 0 0 0 68 7.933333 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1042 09.01.03.06 S1 E SARDINEL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1043 09.01.03.06.01 S1 E COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 3.00 24/01/2022 24/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 3 17.4999 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1044 09.01.03.06.02 S1 E ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 0.00% 13.00 23/01/2022 23/01/2022 1.00 1.00 13.00 13.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 0 0 0 0 13 32.11765 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1045 09.01.03.06.03 S1 E SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 78.50% 6.45 22/01/2022 22/01/2022 1.00 1.00 6.45 6.45 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.45 0 0 0 0 0 6.45 0.7525 0.19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1046 09.01.03.07 S1 E CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1047 09.01.03.07.01 S1 E CURADO DE CONCRETO CON ANTISOL m2 10.09% 308.38 25/01/2022 27/01/2022 3.00 3.00 102.79 308.38 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 102.79 102.79 102.79 308 42.40225 0.9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1048 09.01.03.08 S1 E SELLADO DE JUNTAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1049 09.01.03.08.01 S1 E SELLADO DE JUNTA TIPO 3 m 0.00% 13.00 24/01/2022 24/01/2022 1.00 1.00 13.00 13.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 0 0 0 13 9.1 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1050 09.01.04 S1 E BRUÑAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1051 09.01.04.01 S1 E BRUÑADO EN RAMPA m2 0.00% 235.00 27/12/2021 27/12/2021 1.00 1.00 235.00 235.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 235 0 0 0 235 145.7 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1052 09.01.05 S1 E APLICACIÓN DE GROUT E IMPERMEABILIZANTE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1053 09.01.05.01 S1 E GROUT PARA PEDESTAL E=2.5CM m2 0.00% 1.00 24/01/2022 25/01/2022 2.00 2.00 0.50 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5 0.5 0 0 1 10.93991 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1054 09.01.06 S1 E CARPINTERIA METALICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1055 09.01.06.01 S1 E SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.40m m 60.00% 2.40 31/01/2022 01/02/2022 2.00 2.00 1.20 2.40 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.2 1.2 0 0 2.4 5.025641 0.39 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1056 09.01.07 S1 E ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1057 09.01.07.01 S1 E MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1058 09.01.07.01.01 S1 E SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1059 09.01.07.01.01.01 S1 E ACERO ESTRUCTURAL PERFIL W 8x48 lb/ft kg 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1060 09.01.07.01.01.02 S1 E ACERO ESTRUCTURAL TUBO 4"x4"x7.9mm kg 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1061 09.01.07.01.01.03 S1 E ACERO ESTRUCTURAL PLANCHA 3/4" kg 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1062 09.01.07.01.02 S1 E SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1063 09.01.07.01.02.01 S1 E ACERO ESTRUCTURAL PERFIL W 8x48 lb/ft kg 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1064 09.01.07.01.02.02 S1 E ACERO ESTRUCTURAL PLANCHA 1/2" kg 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1065 09.01.07.01.02.03 S1 E ACERO ESTRUCTURAL PLANCHA 3/8" kg 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1066 09.01.07.01.03 S1 E SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1067 09.01.07.01.03.01 S1 E ACERO ESTRUCTURAL TUBO 4"x4"x7.9mm kg 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1068 09.01.07.01.04 S1 E SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1069 09.01.07.01.04.01 S1 E ACERO ESTRUCTURAL PERFIL U 6"x2"x4.5mm kg 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1070 09.01.07.01.04.02 S1 E ACERO ESTRUCTURAL TUBO CUADRADO 2 1/2"x2 1/2"x6mm kg 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1071 09.01.07.01.04.03 S1 E ACERO ESTRUCTURAL ANGULO 4"x6.35mm kg 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1072 09.01.07.01.04.04 S1 E ACERO ESTRUCTURAL PLANCHA 3/8" kg 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1073 09.01.07.01.04.05 S1 E ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1074 09.01.07.01.04.06 S1 E ACERO ESTRUCTURAL PLANCHA FIERRO GALVANIZADO E=0.8 MM kg 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1075 09.01.07.01.05 S1 E SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1076 09.01.07.01.05.01 S1 E ACERO ESTRUCTURAL FIERRO LISO Ø1/2" kg 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1077 09.01.07.01.06 S1 E SUMINISTRO, INSTALACIÓN DE COBERTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1078 09.01.07.01.06.01 S1 E SUMINISTRO, INSTALACIÓN COBERTURA TR-4 m2 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1079 09.01.07.01.07 S1 E SUMINISTRO, INSTALACIÓN DE CUMBRERA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1080 09.01.07.01.07.01 S1 E SUMINISTRO, INSTALACIÓN DE CUMBRERA TR-4 m 100.00% 0.00 26/11/2021 28/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1081 09.01.07.01.08 S1 E INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1082 09.01.07.01.08.01 S1 E ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=3/4" kg 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1083 09.01.07.02 S1 E INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1084 09.01.07.02.01 S1 E INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y A kg 100.00% 0.00 2.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1085 09.01.07.03 S1 E PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1086 09.01.07.03.01 S1 E PINTURA DE ELEMENTOS METALICOS m2 100.00% 0.00 26/11/2021 26/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1087 09.02 S1 E DISCIPLINA: INSTALACIONES SANITARIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1088 09.02.01 S1 E TUBERIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1089 09.02.01.01 S1 E MONTANTE DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1090 09.02.01.01.01 S1 E 975-SD-4"-P0E03U-10003 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1091 09.02.01.01.01.01 S1 E Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 14.00 24/12/2021 27/12/2021 4.00 4.00 3.50 14.00 X X 0 0 0 0 0 0 0 0 0.00 0 3.5 3.5 3.5 3.5 0 0 0 14 10.3125 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1092 09.02.01.01.01.02 S1 E El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 24/12/2021 27/12/2021 4.00 4.00 0.25 1.00 X X 0 0 0 0 0 0 0 0 0 0 0.25 0.25 0.25 0.25 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1093 09.02.01.01.01 S1 E 975-SD-4"-P0E03U-100015 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1094 09.02.01.01.01.01 S1 E Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 14.00 24/12/2021 27/12/2021 4.00 4.00 3.50 14.00 X X 0 0 0 0 0 0 0 0 0.00 0 3.5 3.5 3.5 3.5 0 0 0 14 10.3125 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1095 09.02.01.01.01.02 S1 E El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 24/12/2021 27/12/2021 4.00 4.00 0.25 1.00 X X 0 0 0 0 0 0 0 0 0 0 0.25 0.25 0.25 0.25 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1096 09.02.02 S1 E MECÁNICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1097 09.02.02.01 S1 E CANALETAS DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1098 09.02.02.01.01 S1 E ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 0.00% 23.00 24/12/2021 27/12/2021 4.00 4.00 5.75 23.00 X X 0 0 0 0 0 0 0 0 0.00 0 5.75 5.75 5.75 5.75 0 0 0 23 0.9625 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1099 09.02.02.01.02 S1 E ACERO ESTRUCTURAL PLANCHA FIERRO GALVANIZADO E=0.8 MM kg 0.00% 173.00 24/12/2021 27/12/2021 4.00 4.00 43.25 173.00 X X 0 0 0 0 0 0 0 0 0.00 0 43.25 43.25 43.25 43.25 0 0 0 173 6.7375 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1100 11.03.02.02 S1 E SOPORTERIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1101 11.03.02.02.01 S1 E GS1-4", Tubería 975-SD-4"-P0E03U-10003 & 100015 pza 0.00% 10.00 24/12/2021 27/12/2021 4.00 4.00 2.50 10.00 X X 0 0 0 0 0 0 0 0 0.00 0 2.5 2.5 2.5 2.5 0 0 0 10 30 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1102 09.03 S1 E DISCIPLINA: INSTALACIONES ELÉCTRICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1103 09.03.01 S1 E SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1104 09.03.01.01 S1 E SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE P pto 0.00% 2.00 31/12/2021 11/01/2022 12.00 12.00 0.17 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1667 0.1667 0.1667 0.1667 0.1667 0.1667 0.1667 1.17 7.0777 0.59 0.1667 0.1667 0.1667 0.1667 0.1667 0 0 0.8333 5.0555 0.42 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1105 09.03.01.02 S1 E SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE pto 0.00% 2.00 31/12/2021 11/01/2022 12.00 12.00 0.17 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1667 0.1667 0.1667 0.1667 0.1667 0.1667 0.1667 1.17 3.4221833 0.57 0.1667 0.1667 0.1667 0.1667 0.1667 0 0 0.8333 2.44441667 0.41 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1106 09.03.01.03 S1 E SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON WATHE pto 0.00% 1.00 31/12/2021 11/01/2022 12.00 12.00 0.08 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0833 0.0833 0.0833 0.0833 0.0833 0.0833 0.0833 0.58 1.0266667 0.51 0.0833 0.0833 0.0833 0.0833 0.0833 0 0 0.4167 0.73333333 0.37 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1107 09.03.01.04 S1 E SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON WAT pto 0.00% 1.00 31/12/2021 11/01/2022 12.00 12.00 0.08 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0833 0.0833 0.0833 0.0833 0.0833 0.0833 0.0833 0.58 2.5666667 0.64 0.0833 0.0833 0.0833 0.0833 0.0833 0 0 0.4167 1.83333333 0.46 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1108 10 S4 F MÓDULO F: ALMACÉN TEMPORAL DE RESIDUOS RECICLABLES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1109 10.01 S4 F DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1110 10.01.01 S4 F MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1111 10.01.01.01 S4 F EXCAVACION P/ZAPATAS m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1112 10.01.01.02 S4 F EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 0.00 26/11/2021 29/11/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1113 10.01.01.03 S4 F REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.00 11/11/2021 11/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1114 10.01.01.04 S4 F TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1115 10.01.01.05 S4 F TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1116 10.01.01.06 S4 F RELLENO CON MATERIAL PROPIO SELECCIONADO m3 100.00% 0.00 18.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1117 10.01.01.07 S4 F MEJORAMIENTO CON MATERIAL GRANULAR m3 100.00% 0.00 18.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1118 10.01.01.08 S4 F ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.00 18.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1119 10.01.01.09 S4 F ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.00 18.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1120 10.01.01.10 S4 F APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.00 18.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1121 09.01.03 S4 F CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1122 10.01.02.01 S4 F CONCRETO SIMPLE PARA ZAPATAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1123 10.01.02.01.01 S4 F COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1124 10.01.03 S4 F CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1125 10.01.03.01 S4 F ZAPATAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1126 10.01.03.01.01 S4 F COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1127 10.01.03.01.02 S4 F SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1128 10.01.03.02 S4 F PEDESTAL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1129 10.01.03.02.01 S4 F COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1130 10.01.03.02.02 S4 F ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1131 10.01.03.02.03 S4 F SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1132 10.01.03.03 S4 F LOSA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1133 10.01.03.03.01 S4 F COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 03/12/2021 05/12/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1134 10.01.03.03.02 S4 F ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 0.00 20/11/2021 23/11/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1135 10.01.03.03.03 S4 F SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 20/11/2021 23/11/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1136 10.01.03.04 S4 F RAMPA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1137 10.01.03.04.01 S4 F COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 4.00 28/12/2021 28/12/2021 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 4 0 0 4 23.3332 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1138 10.01.03.04.02 S4 F ENCOFRADO CARAVISTA Y DESENCOFRADO DE RAMPA m2 0.00% 6.00 26/12/2021 26/12/2021 1.00 1.00 6.00 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 6 0 0 0 0 6 14.823529 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1139 10.01.03.04.03 S4 F SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 159.00 27/12/2021 27/12/2021 1.00 1.00 159.00 159.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 159 0 0 0 159 18.55 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1140 10.01.03.05 S4 F CANAL DE DRENAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1141 10.01.03.05.01 S4 F COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 8.00 05/01/2022 05/01/2022 1.00 1.00 8.00 8.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 0 8 46.6664 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1142 10.01.03.05.02 S4 F ENCOFRADO CARAVISTA Y DESENCOFRADO DE CANAL DE DRENAJE m2 0.00% 29.00 04/01/2022 04/01/2022 1.00 1.00 29.00 29.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 29 0 0 29 81.2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1143 10.01.03.05.03 S4 F SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 383.00 03/01/2022 03/01/2022 1.00 1.00 383.00 383.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 383 0 0 0 383 44.683333 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1144 10.01.03.06 S4 F CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1145 10.01.03.06.01 S4 F CURADO DE CONCRETO CON ANTISOL m2 60.00% 194.40 09/01/2022 11/01/2022 3.00 3.00 64.80 194.40 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64.8 64.8 64.8 0 0 194.4 26.73 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1146 10.01.03.07 S4 F SELLADO DE JUNTAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1147 10.01.03.07.01 S4 F SELLADO DE JUNTA TIPO 1 m 0.00% 35.00 02/01/2022 02/01/2022 1.00 1.00 35.00 35.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 35 0 0 0 0 35 24.5 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1148 10.01.03.07.02 S4 F SELLADO DE JUNTA TIPO 2 m 0.00% 41.00 02/01/2022 02/01/2022 1.00 1.00 41.00 41.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 41 0 0 0 0 41 28.7 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1149 10.01.03.07.03 S4 F SELLADO DE JUNTA TIPO 3 m 0.00% 28.00 02/01/2022 02/01/2022 1.00 1.00 28.00 28.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 28 0 0 0 0 28 19.6 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1150 10.01.03.07.04 S4 F JUNTA TIPICA EN PEDESTAL m 0.00% 20.00 02/01/2022 02/01/2022 1.00 1.00 20.00 20.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 20 0 0 0 0 20 10.5 0.95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1151 10.01.04 S4 F BRUÑAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1152 10.01.04.01 S4 F BRUÑADO EN RAMPA m2 0.00% 15.00 29/12/2021 29/12/2021 1.00 1.00 15.00 15.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 15 0 15 9.3 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1153 10.01.05 S4 F APLICACIÓN DE GROUT E IMPERMEABILIZANTE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1154 10.01.05.01 S4 F GROUT PARA PEDESTAL E=2.5CM m2 0.00% 3.00 26/12/2021 28/12/2021 3.00 3.00 1.00 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 1 1 1 0 0 3 32.819735 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1155 10.01.06 S4 F CARPINTERIA METALICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1156 10.01.06.01 S4 F SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.50m m 60.00% 8.40 12/01/2022 13/01/2022 2.00 2.00 4.20 8.40 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.2 4.2 8.4 22.8666667 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1157 10.01.07 S4 F ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1158 10.01.07.01 S4 F MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1159 10.01.07.01.01 S4 F SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1160 10.01.07.01.01.01 S4 F ACERO ESTRUCTURAL PERFIL W 12x58 lb/ft kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1161 10.01.07.01.01.02 S4 F ACERO ESTRUCTURAL PLANCHA 3/4" kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1162 10.01.07.01.01.03 S4 F ACERO ESTRUCTURAL PLANCHA 5/8" kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1163 10.01.07.01.02 S4 F SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1164 10.01.07.01.02.01 S4 F ACERO ESTRUCTURAL PERFIL W14x34 lb/ft kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1165 10.01.07.01.02.02 S4 F ACERO ESTRUCTURAL PLANCHA 5/8" kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1166 10.01.07.01.02.03 S4 F ACERO ESTRUCTURAL PLANCHA 1/2" kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1167 10.01.07.01.03 S4 F SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1168 10.01.07.01.03.01 S4 F ACERO ESTRUCTURAL PERFIL W 8x24 lb/ft kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1169 10.01.07.01.03.02 S4 F ACERO ESTRUCTURAL PLANCHA 5/8" kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1170 10.01.07.01.04 S4 F SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1171 10.01.07.01.04.01 S4 F ACERO ESTRUCTURAL PERFIL C 6"x2"x1/8" kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1172 10.01.07.01.04.02 S4 F ACERO ESTRUCTURAL ANGULO 5"x5"x3/8" kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1173 10.01.07.01.05 S4 F SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL DIAGONALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1174 10.01.07.01.05.01 S4 F ACERO ESTRUCTURAL PERFIL HSS 3"x3"x3.96mm kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1175 10.01.07.01.05.02 S4 F ACERO ESTRUCTURAL PLANCHA 3/8" kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1176 10.01.07.01.05.03 S4 F ACERO ESTRUCTURAL PLANCHA 1/2" kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1177 10.01.07.01.06 S4 F SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1178 10.01.07.01.06.01 S4 F ACERO ESTRUCTURAL FIERRO LISO Ø1" kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1179 10.01.07.01.06.02 S4 F ACERO ESTRUCTURAL FIERRO LISO Ø5/8" kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1180 10.01.07.01.06.03 S4 F ACERO ESTRUCTURAL PLANCHA 1/4" kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1181 10.01.07.01.07 S4 F SUMINISTRO, INSTALACIÓN DE COBERTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1182 10.01.07.01.07.01 S4 F SUMINISTRO, INSTALACIÓN COBERTURA TR-4 m2 100.00% 0.00 12/11/2021 18/11/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1183 10.01.07.01.08 S4 F SUMINISTRO, INSTALACIÓN DE CUMBRERA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1184 10.01.07.01.08.01 S4 F SUMINISTRO, INSTALACIÓN DE CUMBRERA TR-4 m 100.00% 0.00 19/11/2021 21/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1185 10.01.07.01.09 S4 F INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1186 10.01.07.01.09.01 S4 F ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=3/4" kg 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1187 10.01.07.01 S4 F INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1188 10.01.07.01.01 S4 F INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y A kg 100.00% 0.00 05/11/2021 05/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1189 10.01.07.01 S4 F PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1190 10.01.07.01.01 S4 F PINTURA DE ELEMENTOS METALICOS m2 100.00% 0.00 26/11/2021 26/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1191 10.02 S4 F DISCIPLINA: INSTALACIONES SANITARIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1192 10.02.01 S4 F TUBERIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1193 10.02.01.01 S4 F MONTANTE DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1194 10.02.01.01.01 S4 F 975-SD-4"-P0E03U-10007 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1195 10.02.01.01.01.01 S4 F Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 10.00 24/12/2021 02/01/2022 10.00 10.00 1.00 10.00 X X 0 0 0 0 0 0 0 0 0.00 0 1 1 1 1 1 1 1 7 6.3984375 0.71 1 1 1 0 0 0 0 3 2.7421875 0.3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1196 10.02.01.01.01.02 S4 F El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 24/12/2021 02/01/2022 10.00 10.00 0.10 1.00 X X 0 0 0 0 0 0 0 0 0 0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.7 0 ### 0.1 0.1 0.1 0 0 0 0 0.3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1197 10.02.01.01.02 S4 F 975-SD-4"-P0E03U-100018 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1198 10.02.01.01.02.01 S4 F Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 13.00 24/12/2021 02/01/2022 10.00 10.00 1.30 13.00 X X 0 0 0 0 0 0 0 0 0.00 0 1.3 1.3 1.3 1.3 1.3 1.3 1.3 9.1 6.3984375 0.71 1.3 1.3 1.3 0 0 0 0 3.9 2.7421875 0.3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1199 10.02.01.01.02.02 S4 F El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 24/12/2021 02/01/2022 10.00 10.00 0.10 1.00 X X 0 0 0 0 0 0 0 0 0 0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.7 0 ### 0.1 0.1 0.1 0 0 0 0 0.3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1200 10.02.02 S4 F MECÁNICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1201 10.02.02.01 S4 F CANALETAS DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1202 10.02.02.01.01 S4 F ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 80.00% 6.80 24/12/2021 02/01/2022 10.00 10.00 0.68 6.80 X X 0 0 0 0 0 0 0 0 0.00 0 0.68 0.68 0.68 0.68 0.68 0.68 0.68 4.76 1.903125 0.14 0.68 0.68 0.68 0 0 0 0 2.04 0.815625 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1203 10.02.02.01.02 S4 F ACERO ESTRUCTURAL PLANCHA FIERRO GALVANIZADO E=0.8 MM kg 80.00% 51.20 24/12/2021 02/01/2022 10.00 10.00 5.12 51.20 X X 0 0 0 0 0 0 0 0 0.00 0 5.12 5.12 5.12 5.12 5.12 5.12 5.12 35.8 13.321875 0.14 5.12 5.12 5.12 0 0 0 0 15.4 5.709375 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1204 10.02.02.02 S4 F SOPORTERIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1205 10.02.02.02.01 S4 F GS1-4", Tubería 975-SD-4"-P0E03U-10007 & 100018 pza 80.00% 1.20 24/12/2021 02/01/2022 10.00 10.00 0.12 1.20 X X 0 0 0 0 0 0 0 0 0.00 0 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.84 2.52 0.14 0.12 0.12 0.12 0 0 0 0 0.36 1.08 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1206 10.03 S4 F DISCIPLINA: INSTALACIONES ELÉCTRICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1207 10.03.01 S4 F SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1208 10.03.01.01 S4 F SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE P pto 0.00% 4.00 31/12/2021 14/01/2022 15.00 15.00 0.27 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.2667 0.2667 0.2667 0.2667 0.2667 0.2667 0.2667 1.87 11.32432 0.47 0.2667 0.2667 0.2667 0.2667 0.2667 0.2667 0.2667 1.8667 11.32432 0.47 0.2667 0 0 0 0 0 0 0.27 1.61776 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1209 10.03.01.02 S4 F SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE pto 0.00% 2.00 31/12/2021 14/01/2022 15.00 15.00 0.13 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1333 0.1333 0.1333 0.1333 0.1333 0.1333 0.1333 0.93 2.7377467 0.46 0.1333 0.1333 0.1333 0.1333 0.1333 0.1333 0.1333 0.9333 2.73774667 0.46 0.1333 0 0 0 0 0 0 0.13 0.391107 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1210 10.03.01.03 S4 F SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON WATHE pto 0.00% 1.00 31/12/2021 14/01/2022 15.00 15.00 0.07 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.47 0.8213333 0.41 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.4667 0.82133333 0.41 0.0667 0 0 0 0 0 0 0.07 0.117333 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1211 10.03.01.04 S4 F SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON 5462- pto 0.00% 6.00 31/12/2021 14/01/2022 15.00 15.00 0.40 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.4 0.4 0.4 0.4 0.4 0.4 0.4 2.8 12.32 0.47 0.4 0.4 0.4 0.4 0.4 0.4 0.4 2.8 12.32 0.47 0.4 0 0 0 0 0 0 0.4 1.76 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1212 10.03.01.05 S4 F SUMINISTRO Y MONTAJE DE TOMACORRIENTE INDUSTRIAL MONOFÁSI pto 0.00% 1.00 31/12/2021 14/01/2022 15.00 15.00 0.07 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.47 2.6133333 0.44 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.4667 2.61333333 0.44 0.0667 0 0 0 0 0 0 0.07 0.373333 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1213 10.03.01.06 S4 F SUMINISTRO Y MONTAJE DE TOMACORRIENTE INDUSTRIAL TRIFÁSICO pto 0.00% 1.00 31/12/2021 14/01/2022 15.00 15.00 0.07 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.47 2.6133333 0.44 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.4667 2.61333333 0.44 0.0667 0 0 0 0 0 0 0.07 0.373333 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1214 10.03.02 S4 F TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1215 10.03.02.01 S4 F SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1135 UND 0.00% 1.00 31/12/2021 14/01/2022 15.00 15.00 0.07 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.47 42.0042 0.47 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.4667 42.0042 0.47 0.0667 0 0 0 0 0 0 0.07 6.0006 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1216 10.03.03 S4 F CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1217 10.03.03.01 S4 F SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 144.00 31/12/2021 14/01/2022 15.00 15.00 9.60 144.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 9.6 9.6 9.6 9.6 9.6 9.6 9.6 67.2 60.67488 0.47 9.6 9.6 9.6 9.6 9.6 9.6 9.6 67.2 60.67488 0.47 9.6 0 0 0 0 0 0 9.6 8.66784 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1218 10.03.04 S4 F CONDUCTORES Y CABLES DE ENERGIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1219 10.03.04.01 S4 F SUMINISTRO E INSTALACIÓN DE CABLE 2-1/c #12 AWG + GRD; XHHW-2, 0 M 0.00% 88.00 31/12/2021 14/01/2022 15.00 15.00 5.87 88.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 5.8667 5.8667 5.8667 5.8667 5.8667 5.8667 5.8667 41.1 11.85184 0.47 5.8667 5.8667 5.8667 5.8667 5.8667 5.8667 5.8667 41.067 11.85184 0.47 5.8667 0 0 0 0 0 0 5.87 1.69312 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1220 10.03.04.02 S4 F SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW M 0.00% 91.00 31/12/2021 14/01/2022 15.00 15.00 6.07 91.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 6.0667 6.0667 6.0667 6.0667 6.0667 6.0667 6.0667 42.5 12.25588 0.47 6.0667 6.0667 6.0667 6.0667 6.0667 6.0667 6.0667 42.467 12.25588 0.47 6.0667 0 0 0 0 0 0 6.07 1.75084 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1221 10.03.04.03 S4 F SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #12 AWG + GRD; XHHW-2, 0 m 0.00% 2.00 31/12/2021 14/01/2022 15.00 15.00 0.13 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1333 0.1333 0.1333 0.1333 0.1333 0.1333 0.1333 0.93 0.9333333 0.47 0.1333 0.1333 0.1333 0.1333 0.1333 0.1333 0.1333 0.9333 0.93333333 0.47 0.1333 0 0 0 0 0 0 0.13 0.133333 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1222 10.03.05 S4 F EQUIPOS ELÉCTRICOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1223 10.03.05.01 S4 F INSTALACIÓN DE EQUIPO 1 ENFARDADOR HORIZONTAL 5.52 KW 440 und 0.00% 1.00 26/12/2021 27/12/2021 2.00 2.00 0.50 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0.5 0.5 0 0 0 1 62 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1224 10.03.05.02 S4 F INSTALACIÓN DE EQUIPO 1 TRITURADOR DE VIDRIOS 1.5 KW 220 V und 0.00% 1.00 26/12/2021 27/12/2021 2.00 2.00 0.50 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0.5 0.5 0 0 0 1 19.0769 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1225 11 S4 G MÓDULO G: REVEGETACIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1226 11.01 S4 G DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1227 11.01.01 S4 G MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1228 11.01.01.01 S4 G EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 0.00 02/11/2021 02/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1229 11.01.01.02 S4 G REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.00 02/11/2021 04/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1230 11.01.01.03 S4 G ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.00 02/11/2021 02/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1231 11.01.01.04 S4 G ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.00 02/11/2021 02/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1232 11.01.01.05 S4 G APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.00 02/11/2021 02/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1233 11.01.02 S4 G CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1234 11.01.02.01 S4 G PEDESTAL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1235 11.01.02.01.01 S4 G COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 17/11/2021 18/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1236 11.01.02.01.02 S4 G ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 100.00% 0.00 12/11/2021 14/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1237 11.01.02.01.03 S4 G SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 15/11/2021 16/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1238 11.01.02.01 S4 G LOSA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1239 11.01.02.01.01 S4 G COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 12/11/2021 16/11/2021 5.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1240 11.01.02.01.02 S4 G ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 0.00 02/11/2021 04/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1241 11.01.02.01.03 S4 G SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 05/11/2021 06/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1242 11.01.02.01 S4 G RAMPA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1243 11.01.02.01.01 S4 G COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 22/11/2021 22/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1244 11.01.02.01.02 S4 G ENCOFRADO CARAVISTA Y DESENCOFRADO DE RAMPA m2 100.00% 0.00 20/11/2021 20/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1245 11.01.02.01.03 S4 G SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 21/11/2021 21/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1246 11.01.02.01 S4 G CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1247 11.01.02.01.01 S4 G CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.00 23/11/2021 25/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1248 11.01.02.01 S4 G SELLADO DE JUNTAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1249 11.01.02.01.01 S4 G SELLADO DE JUNTA TIPO 1 m 100.00% 0.00 14/12/2021 14/12/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1250 11.01.02.01.02 S4 G SELLADO DE JUNTA TIPO 2 m 100.00% 0.00 14/12/2021 14/12/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1251 11.01.02.01.03 S4 G JUNTA TIPICA EN PEDESTAL m 100.00% 0.00 14/12/2021 14/12/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1252 11.01.03 S4 G BRUÑAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1253 11.01.03.01 S4 G BRUÑADO EN RAMPA m2 100.00% 0.00 22/11/2021 22/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1254 11.01.04 S4 G APLICACIÓN DE GROUT E IMPERMEABILIZANTE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1255 11.01.04.01 S4 G GROUT PARA PEDESTAL E=2.5CM m2 0.00% 1.00 27/12/2021 29/12/2021 3.00 3.00 0.33 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0.3333 0.3333 0.3333 0 1 10.939912 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1256 11.01.05 S4 G ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1257 11.01.05.01 S4 G DESMONTAJE DE ESTRUCTURAS METALICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1258 11.01.05.01.01 S4 G DESMONTAJE DE CONTAINER REUTILIZABLES kg 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1259 11.01.05.01.02 S4 G DESMONTAJE COBERTURA DE TR-4 REUTILIZABLES m2 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1260 11.01.05.01.03 S4 G DESMONTAJE CERRAMIENTO TR-4 TRANSLUCIDO REUTILIZABLES m2 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1261 11.01.05.01.04 S4 G DESMONTAJE DE PANELES DE MALLA GALVANIZADA REUTILIZABLES kg 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1262 11.01.05.01.05 S4 G DESMONTAJE DE CORREAS REUTILIZABLES kg 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1263 11.01.05.01.06 S4 G DESMONTAJE DE TIJERALES REUTILIZABLES kg 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1264 11.01.05.01.07 S4 G DESMONTAJE DE VIGAS DE ARRIOSTRE REUTILIZABLES kg 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1265 11.01.05.01.08 S4 G DESMONTAJE DE TEMPLADORES REUTILIZABLES kg 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1266 11.01.05.01.09 S4 G DESMONTAJE DE PUERTAS METALICAS REUTILIZABLES kg 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1267 11.01.05.01.10 S4 G DESMONTAJE DE COLUMNAS REUTILIZABLES kg 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1268 11.01.05.02 S4 G MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1269 11.01.05.02.01 S4 G INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS REUTILI kg 0.00% 93.00 17/12/2021 21/12/2021 5.00 5.00 18.60 93.00 X X 18.6 18.6 18.6 18.6 18.6 0 0 93 5.35 1.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1270 11.01.05.02.02 S4 G INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES REUTILIZ kg 0.00% 396.00 17/12/2021 21/12/2021 5.00 5.00 79.20 396.00 X X 79.2 79.2 79.2 79.2 79.2 0 0 396 30.36 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1271 11.01.05.02.03 S4 G INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTR kg 0.00% 391.00 17/12/2021 21/12/2021 5.00 5.00 78.20 391.00 X X 78.2 78.2 78.2 78.2 78.2 0 0 391 22.50 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1272 11.01.05.02.04 S4 G INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS REUTILIZA kg 0.00% 1,090.00 17/12/2021 21/12/2021 5.00 5.00 218.00 1090.00 X X 218 218 218 218 218 0 0 1090 104.58 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1273 11.01.05.02.05 S4 G INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES REUT kg 0.00% 112.00 17/12/2021 21/12/2021 5.00 5.00 22.40 112.00 X X 22.4 22.4 22.4 22.4 22.4 0 0 112 12.89 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1274 11.01.05.02.06 S4 G INSTALACIÓN E IZAJE DE CONTAINER REUTILIZABLE kg 0.00% 8,300.00 17/12/2021 21/12/2021 5.00 5.00 1,660.00 8300.00 X X 1660 1660 1660 1660 1660 0 0 8300 456.50 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1275 11.01.05.02.07 S4 G INSTALACIÓN DE PUERTAS METALICAS REUTILIZABLE kg 0.00% 140.00 22/12/2021 23/12/2021 2.00 2.00 70.00 140.00 X X 0 0 0 0 0 70 70 140 15.75 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1276 11.01.05.02.08 S4 G INSTALACIÓN COBERTURA DE TR-4 REUTILIZABLES m2 0.00% 150.00 22/12/2021 26/12/2021 5.00 5.00 30.00 150.00 X X 0 0 0 0 0 30 30 60 26.00 0.4 30 30 30 0 0 0 0 90 39 0.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1277 11.01.05.02.09 S4 G INSTALACIÓN CERRAMIENTO TR-4 TRANSLUCIDO REUTILIZABLES m2 0.00% 31.00 22/12/2021 26/12/2021 5.00 5.00 6.20 31.00 X X 0 0 0 0 0 6.2 6.2 12.4 5.37 0.41 6.2 6.2 6.2 0 0 0 0 18.6 8.06 0.62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1278 11.01.05.03 S4 G MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1279 11.01.05.03.01 S4 G SUMINISTRO, INSTALACIÓN DE CUMBRERA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1280 11.01.05.03.01.01 S4 G SUMINISTRO, INSTALACIÓN DE CUMBRERA TR-4 m 57.65% 7.62 27/12/2021 28/12/2021 2.00 2.00 3.81 7.62 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 3.81 3.81 0 0 7.62 1.2833684 0.43 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1281 11.01.05.04 S4 G INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1282 11.01.05.04.01 S4 G INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y A kg 0.00% 535.00 20/12/2021 24/12/2021 5.00 5.00 107.00 535.00 X X 0 0 0 107 107 107 107 428 37.91 0.81 107 0 0 0 0 0 0 107 9.4783465 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1283 11.01.05.05 S4 G LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1284 11.01.05.05.01 S4 G LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 100.00% 0.00 10/11/2021 10/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1285 11.01.05.06 S4 G PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1286 11.01.05.06.01 S4 G PINTURA DE ELEMENTOS METALICOS m2 50.00% 239.00 29/12/2021 31/12/2021 3.00 3.00 79.67 239.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 79.667 79.667 159 69.708333 0.33 79.667 0 0 0 0 0 0 79.7 34.854167 0.17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1287 11.01.05.07 S4 G TRANSPORTE DE ELEMENTOS ESTRUCTURALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1288 11.01.05.07.01 S4 G TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 100.00% 0.00 26/11/2021 26/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1289 11.02 S4 G DISCIPLINA: INSTALACIONES SANITARIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1290 11.02.01 S4 G TUBERIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1291 11.02.01.01 S4 G MONTANTE DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1292 11.02.01.01.01 S4 G 975-SD-4"-P0E03U-10005 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1293 11.02.01.01.01.01 S4 G Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 5.00 02/01/2022 06/01/2022 5.00 5.00 1.00 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 5 7.5 0.94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1294 11.02.01.01.01.02 S4 G El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 02/01/2022 06/01/2022 5.00 5.00 0.20 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0.2 0.2 0.2 0.2 0.2 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1295 11.02.01.01.02 S4 G 975-SD-4"-P0E03U-10008 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1296 11.02.01.01.02.01 S4 G Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 6.00 02/01/2022 06/01/2022 5.00 5.00 1.20 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 1.2 1.2 1.2 1.2 1.2 6 7.5 0.94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1297 11.02.01.01.02.02 S4 G El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 02/01/2022 06/01/2022 5.00 5.00 0.20 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0.2 0.2 0.2 0.2 0.2 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1298 11.02.02 S4 G MECÁNICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1299 11.02.02.01 S4 G CANALETAS DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1300 11.02.02.01.01 S4 G ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 0.00% 32.00 07/01/2022 11/01/2022 5.00 5.00 6.40 32.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.4 6.4 6.4 6.4 6.4 0 0 32 12.84375 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1301 11.02.02.01.02 S4 G ACERO ESTRUCTURAL PLANCHA FIERRO GALVANIZADO E=0.8 MM kg 0.00% 242.00 07/01/2022 11/01/2022 5.00 5.00 48.40 242.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 48.4 48.4 48.4 48.4 48.4 0 0 242 89.90625 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1302 11.02.02.02 S4 G SOPORTERIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1303 11.02.02.02.01 S4 G GS1-4", Tubería 975-SD-4"-P0E03U-10005 & 10008 pza 0.00% 6.00 07/01/2022 11/01/2022 5.00 5.00 1.20 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.2 1.2 1.2 1.2 1.2 0 0 6 18 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1304 11.03 S4 G DISCIPLINA: INSTALACIONES ELÉCTRICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1305 11.03.01 S4 G SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1306 11.03.01.01 S4 G ARTEFACTO DE ALUMBRADO LITHONIA LIGHTING FEM L48 8000LM LPPF pto 0.00% 10.00 07/01/2022 07/01/2022 1.00 1.00 10.00 10.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 0 0 0 0 0 0 10 72.8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1307 11.03.01.02 S4 G SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE pto 0.00% 4.00 08/01/2022 08/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 4 24.2664 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1308 11.03.01.03 S4 G SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON 1286W pto 0.00% 4.00 09/01/2022 09/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 4 7.04 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1309 11.03.01.04 S4 G SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON 5462- pto 0.00% 6.00 10/01/2022 10/01/2022 1.00 1.00 6.00 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 0 6 26.4 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1310 11.03.02 S4 G TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1311 11.03.02.01 S4 G SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1136 UND 0.00% 1.00 10/01/2022 10/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 90.009 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1312 11.03.02.02 S4 G SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-LPA-1184 UND 0.00% 1.00 11/01/2022 11/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 42.66 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1313 11.03.02.03 S4 G SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-LPA-1185 UND 0.00% 1.00 12/01/2022 12/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 42.66 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1314 11.03.02.04 S4 G SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-LPA-1186 UND 0.00% 1.00 13/01/2022 13/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 42.66 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1315 11.03.03 S4 G CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1316 11.03.03.01 S4 G SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 117.00 07/01/2022 08/01/2022 2.00 2.00 58.50 117.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 58.5 58.5 0 0 0 0 0 117 105.6393 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1317 11.03.03.02 S4 G SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 1"Ø m 0.00% 37.00 07/01/2022 08/01/2022 2.00 2.00 18.50 37.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18.5 18.5 0 0 0 0 0 37 30.4177 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1318 11.03.04 S4 G CONDUCTORES Y CABLES DE ENERGIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1319 11.03.04.01 S4 G SUMINISTRO E INSTALACIÓN DE CABLE 2-1/c #12 AWG + GRD; XHHW-2, 0 m 0.00% 70.00 07/01/2022 08/01/2022 2.00 2.00 35.00 70.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35 35 0 0 0 0 0 70 20.202 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1320 11.03.04.02 S4 G SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW M 0.00% 117.00 07/01/2022 08/01/2022 2.00 2.00 58.50 117.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 58.5 58.5 0 0 0 0 0 117 33.7662 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1321 12 S4 H MÓDULO H: ALMACÉN DE HERRAMIENTAS Y EQUIPOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1322 12.01 S4 H DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1323 12.01.01 S4 H MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1324 12.01.01.01 S4 H EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 0.00 Err:507 Err:507 4.00Err:507 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1325 12.01.01.02 S4 H REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.00 03/12/2021 06/12/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1326 12.01.01.03 S4 H ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.00 Err:507 Err:507 4.00Err:507 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1327 12.01.01.04 S4 H ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.00 Err:507 Err:507 4.00Err:507 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1328 12.01.01.05 S4 H APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.00 Err:507 Err:507 4.00Err:507 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1329 12.01.02 S4 H CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1330 12.01.02.01 S4 H PEDESTAL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1331 12.01.02.01.01 S4 H COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 1.00 28/12/2021 31/12/2021 4.00 4.00 0.25 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0.25 0.25 0.25 0.75 4.374975 0.73 0.25 0 0 0 0 0 0 0.25 1.458325 0.24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1332 12.01.02.01.02 S4 H ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 0.00% 1.00 25/12/2021 27/12/2021 3.00 3.00 0.33 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0.3333 0.3333 0.3333 0 0 0 1 2.625 0.88 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1333 12.01.02.01.03 S4 H SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 50.00% 58.50 24/12/2021 27/12/2021 4.00 4.00 14.63 58.50 X X 0 0 0 0 0 0 0 0 0.00 0 14.625 14.625 14.625 14.625 0 0 0 58.5 6.825 0.49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1334 12.01.02.02 S4 H LOSA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1335 12.01.02.02.01 S4 H COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 24.00 28/12/2021 31/12/2021 4.00 4.00 6.00 24.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 6 6 6 18 104.9994 0.75 6 0 0 0 0 0 0 6 34.9998 0.25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1336 12.01.02.02.02 S4 H ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 0.00% 17.00 25/12/2021 27/12/2021 3.00 3.00 5.67 17.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 5.6667 5.6667 5.6667 0 0 0 17 42 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1337 12.01.02.02.03 S4 H SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 50.00% 412.50 24/12/2021 27/12/2021 4.00 4.00 103.13 412.50 X X 0 0 0 0 0 0 0 0 0.00 0 103.13 103.13 103.13 103.13 0 0 0 413 48.125 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1338 12.01.02.03 S4 H SARDINEL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1339 12.01.02.03.01 S4 H COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 2.00 01/01/2022 04/01/2022 4.00 4.00 0.50 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0.5 0.5 0.5 0.5 0 0 2 11.6666 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1340 12.01.02.03.02 S4 H ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 0.00% 7.00 01/01/2022 04/01/2022 4.00 4.00 1.75 7.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 1.75 1.75 1.75 1.75 0 0 7 17.294118 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1341 12.01.02.03.03 S4 H SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 53.00 01/01/2022 04/01/2022 4.00 4.00 13.25 53.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 13.25 13.25 13.25 13.25 0 0 53 6.1833333 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1342 12.01.02.04 S4 H CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1343 12.01.02.04.01 S4 H CURADO DE CONCRETO CON ANTISOL m2 0.00% 110.00 07/01/2022 12/01/2022 6.00 6.00 18.33 110.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18.333 18.333 18.333 18.333 18.333 18.333 0 110 15.125 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1344 12.01.02.05 S4 H SELLADO DE JUNTAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1345 12.01.02.05.01 S4 H SELLADO DE JUNTA TIPO 1 m 0.00% 19.00 28/01/2022 28/01/2022 1.00 1.00 19.00 19.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19 0 0 0 0 0 0 19 13.3 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1346 12.01.02.05.02 S4 H SELLADO DE JUNTA TIPO 2 m 0.00% 20.00 28/01/2022 28/01/2022 1.00 1.00 20.00 20.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 0 0 0 0 0 0 20 14 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1347 12.01.02.05.03 S4 H JUNTA TIPICA EN PEDESTAL m 0.00% 12.00 28/01/2022 28/01/2022 1.00 1.00 12.00 12.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 0 0 0 12 6.3 1.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1348 12.01.03 S4 H APLICACIÓN DE GROUT E IMPERMEABILIZANTE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1349 12.01.03.01 S4 H GROUT PARA PEDESTAL E=2.5CM m2 0.00% 1.00 11/01/2022 13/01/2022 3.00 3.00 0.33 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3333 0.3333 0.3333 1 10.9399118 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1350 12.01.04 S4 H ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1351 12.01.04.01 S4 H DESMONTAJE DE ESTRUCTURAS METALICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1352 12.01.04.01.01 S4 H DESMONTAJE DE CONTAINER REUTILIZABLES kg 100.00% 0.00 30/11/2021 01/12/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1353 12.01.04.01.02 S4 H DESMONTAJE COBERTURA DE TR-4 REUTILIZABLES m2 100.00% 0.00 30/11/2021 01/12/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1354 12.01.04.01.03 S4 H DESMONTAJE DE PANELES DE MALLA GALVANIZADA REUTILIZABLES kg 100.00% 0.00 30/11/2021 01/12/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1355 12.01.04.01.04 S4 H DESMONTAJE DE CORREAS REUTILIZABLES kg 100.00% 0.00 30/11/2021 01/12/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1356 12.01.04.01.05 S4 H DESMONTAJE DE TIJERALES REUTILIZABLES kg 100.00% 0.00 30/11/2021 01/12/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1357 12.01.04.01.06 S4 H DESMONTAJE DE PUERTAS METALICAS REUTILIZABLES kg 100.00% 0.00 30/11/2021 01/12/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1358 12.01.04.01.07 S4 H DESMONTAJE DE COLUMNAS REUTILIZABLES kg 100.00% 0.00 30/11/2021 01/12/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1359 12.01.04.02 S4 H MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1360 12.01.04.02.01 S4 H INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS REUTILI kg 0.00% 766.00 04/01/2022 10/01/2022 7.00 7.00 109.43 766.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 109.43 109.43 109.43 328 18.891122 0.43 109.43 109.43 109.43 109.43 0 0 0 437.71 25.1881622 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1361 12.01.04.02.02 S4 H INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES REUTILIZ kg 0.00% 505.00 04/01/2022 10/01/2022 7.00 7.00 72.14 505.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 72.143 72.143 72.143 216 16.591628 0.43 72.143 72.143 72.143 72.143 0 0 0 288.57 22.1221708 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1362 12.01.04.02.03 S4 H INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS REUTILIZA kg 0.00% 233.00 04/01/2022 10/01/2022 7.00 7.00 33.29 233.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 33.286 33.286 33.286 99.9 9.5811758 0.44 33.286 33.286 33.286 33.286 0 0 0 133.14 12.774901 0.58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1363 12.01.04.02.04 S4 H INSTALACIÓN E IZAJE DE CONTAINER REUTILIZABLE kg 0.00% 4,500.00 04/01/2022 10/01/2022 7.00 7.00 642.86 4500.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 642.86 642.86 642.86 1929 106.07143 0.43 642.86 642.86 642.86 642.86 0 0 0 2571 141.428571 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1364 12.01.04.02.05 S4 H INSTALACIÓN DE PUERTAS METALICAS REUTILIZABLE kg 0.00% 81.00 04/01/2022 10/01/2022 7.00 7.00 11.57 81.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11.571 11.571 11.571 34.7 3.9053571 0.43 11.571 11.571 11.571 11.571 0 0 0 46.286 5.20714286 0.58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1365 12.01.04.02.06 S4 H INSTALACIÓN COBERTURA DE TR-4 REUTILIZABLES m2 0.00% 117.00 04/01/2022 10/01/2022 7.00 7.00 16.71 117.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16.714 16.714 16.714 50.1 21.728571 0.43 16.714 16.714 16.714 16.714 0 0 0 66.857 28.9714286 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1366 12.01.04.02.07 S4 H INSTALACIÓN CERRAMIENTO MALLA GALVANIZADA REUTILIZABLES kg 0.00% 337.00 04/01/2022 10/01/2022 7.00 7.00 48.14 337.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 48.143 48.143 48.143 144 27.656535 0.43 48.143 48.143 48.143 48.143 0 0 0 192.57 36.8753799 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1367 12.01.04.03 S4 H MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1368 12.01.04.03.01 S4 H SUMINISTRO, INSTALACIÓN DE PANELES DE MALLA GALVANIZADA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1369 12.01.04.03.01.01 S4 H ACERO ESTRUCTURAL ANGULO 2 1/2"x2 1/2"x3/16" kg 0.00% 262.00 11/01/2022 13/01/2022 3.00 3.00 87.33 262.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 87.333 87.333 87.333 262 30.1534527 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1370 12.01.04.03.01.02 S4 H ACERO ESTRUCTURAL PLATINA 1/8"x3/4" kg 0.00% 27.00 11/01/2022 13/01/2022 3.00 3.00 9.00 27.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 9 9 27 3.45170455 1.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1371 12.01.04.03.02 S4 H SUMINISTRO, INSTALACIÓN DE CUMBRERA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1372 12.01.04.03.02.01 S4 H SUMINISTRO, INSTALACIÓN DE CUMBRERA TR-4 m 57.65% 4.23 11/01/2022 13/01/2022 3.00 3.00 1.41 4.23 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.41 1.41 1.41 4.23 0.71242105 0.36 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1373 12.01.04.04 S4 H INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1374 12.01.04.04.01 S4 H INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y A kg 60.00% 134.40 04/01/2022 10/01/2022 7.00 7.00 19.20 134.40 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19.2 19.2 19.2 57.6 5.1023622 0.17 19.2 19.2 19.2 19.2 0 0 0 76.8 6.80314961 0.23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1375 12.01.04.05 S4 H LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1376 12.01.04.05.01 S4 H LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 100.00% 0.00 11/12/2021 22/12/2021 12.00 12.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1377 12.01.04.06 S4 H PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1378 12.01.04.06.01 S4 H PINTURA DE ELEMENTOS METALICOS m2 100.00% 0.00 11/12/2021 22/12/2021 12.00 12.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1379 12.01.04.07 S4 H TRANSPORTE DE ELEMENTOS ESTRUCTURALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1380 12.01.04.07.01 S4 H TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 100.00% 0.00 11/12/2021 15/12/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1381 12.02 S4 H DISCIPLINA: INSTALACIONES SANITARIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1382 12.02.01 S4 H TUBERIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1383 12.02.01.01 S4 H MONTANTE DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1384 12.02.01.01.01 S4 H 975-SD-4"-P0E03U-100014 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1385 12.02.01.01.01.01 S4 H Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 14.00 11/01/2022 15/01/2022 5.00 5.00 2.80 14.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.8 2.8 2.8 8.4 6.46875 0.59 2.8 2.8 0 0 0 0 0 5.6 4.3125 0.39 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1386 12.02.01.01.01.02 S4 H El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 11/01/2022 15/01/2022 5.00 5.00 0.20 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.2 0.2 0.2 0.6 0 ### 0.2 0.2 0 0 0 0 0 0.4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1387 12.02.01.01.01.03 S4 H El, 45Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 11/01/2022 15/01/2022 5.00 5.00 0.20 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.2 0.2 0.2 0.6 0 ### 0.2 0.2 0 0 0 0 0 0.4 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1388 12.02.01.01.02 S4 H 975-SD-4"-P0E03U-100017 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1389 12.02.01.01.02.01 S4 H Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 5.00 12/01/2022 16/01/2022 5.00 5.00 1.00 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 2 4.3125 0.39 1 1 1 0 0 0 0 3 6.46875 0.59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1390 12.02.01.01.02.02 S4 H El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 12/01/2022 16/01/2022 5.00 5.00 0.20 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0.2 0.2 0.4 0 ### 0.2 0.2 0.2 0 0 0 0 0.6 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1391 12.02.02 S4 H MECÁNICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1392 12.02.02.01 S4 H CANALETAS DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1393 12.02.02.01.01 S4 H ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 0.00% 18.00 11/01/2022 11/01/2022 1.00 1.00 18.00 18.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18 0 0 18 7.171875 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1394 12.02.02.01.02 S4 H ACERO ESTRUCTURAL PLANCHA FIERRO GALVANIZADO E=0.8 MM kg 0.00% 135.00 11/01/2022 11/01/2022 1.00 1.00 135.00 135.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 135 0 0 135 50.203125 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1395 12.02.02.02 S4 H SOPORTERIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1396 12.02.02.02.01 S4 H GS1-4", Tubería 975-SD-4"-P0E03U-100014 & 100017 pza 0.00% 6.00 11/01/2022 11/01/2022 1.00 1.00 6.00 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 6 18 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1397 12.03 S4 H DISCIPLINA: INSTALACIONES ELÉCTRICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1398 12.03.01 S4 H SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1399 12.03.01.01 S4 H ARTEFACTO DE ALUMBRADO LITHONIA LIGHTING FEM L48 8000LM LPPF pto 0.00% 5.00 17/01/2022 17/01/2022 1.00 1.00 5.00 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 5 36.4 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1400 12.03.01.02 S4 H SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE pto 0.00% 3.00 17/01/2022 17/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 3 18.1998 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1401 12.03.01.03 S4 H SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON 1286W pto 0.00% 3.00 17/01/2022 17/01/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 3 5.28 1.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1402 12.03.01.04 S4 H SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON 5462- pto 0.00% 6.00 17/01/2022 17/01/2022 1.00 1.00 6.00 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 0 6 26.4 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1403 12.03.01.05 S4 H SUMINISTRO Y MONTAJE DE TOMACORRIENTE INDUSTRIAL MONOFÁSI pto 0.00% 1.00 17/01/2022 17/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 5.6 0.93 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1404 12.03.02 S4 H TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1405 12.03.02.01 S4 H SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1137 und 0.00% 1.00 20/01/2022 26/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.14 12.85843 0.14 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0 0.86 77.15057 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1406 12.03.02.02 S4 H SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-LPA-1191 UND 0.00% 1.00 20/01/2022 26/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.14 6.094286 0.14 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0 0.86 36.56571 0.85 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1407 12.03.02.03 S4 H SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-LPA-1189 UND 0.00% 1.00 20/01/2022 26/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.14 6.094286 0.14 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0 0.86 36.56571 0.85 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1408 12.03.02.04 S4 H SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-LPA-1190 UND 0.00% 1.00 20/01/2022 26/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.14 6.094286 0.14 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0 0.86 36.56571 0.85 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1409 12.03.02.05 S4 H SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE 230
UND 0.00% 1.00 20/01/2022 26/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.14 0.196671 0.2 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0 0.86 1.180029 1.18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1410 12.03.03 S4 H CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1411 12.03.03.01 S4 H SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 28.00 17/01/2022 21/01/2022 5.00 5.00 5.60 28.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.6 5.6 5.6 5.6 22.4 17.024 0.81 5.6 0 0 0 0 0 0 5.6 4.256 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1412 12.03.03.02 S4 H SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 5.00 17/01/2022 21/01/2022 5.00 5.00 1.00 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 4 4.864 0.81 1 0 0 0 0 0 0 1 1.216 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1413 12.03.03.03 S4 H SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 1"Ø m 0.00% 21.00 17/01/2022 21/01/2022 5.00 5.00 4.20 21.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.2 4.2 4.2 4.2 16.8 13.81128 0.81 4.2 0 0 0 0 0 0 4.2 3.45282 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1414 12.03.03.04 S4 H SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 83.00 17/01/2022 21/01/2022 5.00 5.00 16.60 83.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16.6 16.6 16.6 16.6 66.4 59.95256 0.8 16.6 0 0 0 0 0 0 16.6 14.98814 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1415 12.03.04 S4 H CONDUCTORES Y CABLES DE ENERGIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1416 12.03.04.01 S4 H SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #8AWG+GRD; XHHW-2 M 0.00% 26.00 17/01/2022 21/01/2022 5.00 5.00 5.20 26.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.2 5.2 5.2 5.2 20.8 6.00288 0.75 5.2 0 0 0 0 0 0 5.2 1.50072 0.19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1417 12.03.04.02 S4 H SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW M 0.00% 103.00 17/01/2022 21/01/2022 5.00 5.00 20.60 103.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20.6 20.6 20.6 20.6 82.4 23.78064 0.79 20.6 0 0 0 0 0 0 20.6 5.94516 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1418 12.03.04.03 S4 H SUMINISTRO E INSTALACIÓN DE CABLE 2-1/c #12 AWG + GRD; XHHW-2, 0 M 0.00% 43.00 17/01/2022 21/01/2022 5.00 5.00 8.60 43.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.6 8.6 8.6 8.6 34.4 9.92784 0.83 8.6 0 0 0 0 0 0 8.6 2.48196 0.21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1419 12.03.05 S4 H EQUIPOS ELÉCTRICOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1420 12.03.05.01 S4 H SUMINISTRO E INSTALACIÓN DE EQUIPO 1 COMPRESORA 975-CPZ-603 und 0.00% 1.00 27/01/2022 27/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 49.6 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1421 13 S4 I MÓDULO I: ALMACÉN DE CONTROL DE EROSIÓN Y SEDIMENTACIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1422 13.01 S4 I DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1423 13.01.01 S4 I MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1424 13.01.01.01 S4 I EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 0.00 Err:507 Err:507 4.00Err:507 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1425 13.01.01.02 S4 I REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.00 26/11/2021 29/11/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1426 13.01.01.03 S4 I ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.00 26/11/2021 29/11/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1427 13.01.01.04 S4 I ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.00 26/11/2021 29/11/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1428 13.01.01.05 S4 I APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.00 26/11/2021 29/11/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1429 13.01.02 S4 I CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1430 13.01.02.01 S4 I PEDESTAL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1431 13.01.02.01.01 S4 I COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 4.00 02/01/2022 03/01/2022 2.00 2.00 2.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0 0 0 4 23.3332 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1432 13.01.02.01.02 S4 I ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 0.00% 6.00 27/12/2021 29/12/2021 3.00 3.00 2.00 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 2 2 2 0 6 15.75 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1433 13.01.02.01.03 S4 I SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 45.00 30/12/2021 01/01/2022 3.00 3.00 15.00 45.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 15 15 1.75 0.35 15 15 0 0 0 0 0 30 3.5 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1434 13.01.02.02 S4 I LOSA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1435 13.01.02.02.01 S4 I COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 22.00 02/01/2022 03/01/2022 2.00 2.00 11.00 22.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 11 11 0 0 0 22 128.3326 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1436 13.01.02.02.02 S4 I ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 0.00% 14.00 27/12/2021 29/12/2021 3.00 3.00 4.67 14.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 4.6667 4.6667 4.6667 0 14 34.588235 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1437 13.01.02.02.03 S4 I SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 58.71% 337.78 30/12/2021 01/01/2022 3.00 3.00 112.59 337.78 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 112.59 113 13.135889 0.14 112.59 112.59 0 0 0 0 0 225 26.271778 0.28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1438 13.01.02.03 S4 I RAMPA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1439 13.01.02.03.01 S4 I COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 4.00 14/01/2022 14/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 4 23.3332 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1440 13.01.02.03.02 S4 I ENCOFRADO CARAVISTA Y DESENCOFRADO DE RAMPA m2 0.00% 4.00 10/01/2022 11/01/2022 2.00 2.00 2.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0 0 4 9.88235294 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1441 13.01.02.03.03 S4 I SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 153.00 12/01/2022 13/01/2022 2.00 2.00 76.50 153.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 76.5 76.5 153 17.85 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1442 13.01.02.04 S4 I CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1443 13.01.02.04.01 S4 I CURADO DE CONCRETO CON ANTISOL m2 0.00% 114.00 18/01/2022 20/01/2022 3.00 3.00 38.00 114.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 38 38 38 114 15.675 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1444 13.01.02.05 S4 I SELLADO DE JUNTAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1445 13.01.02.05.01 S4 I SELLADO DE JUNTA TIPO 1 m 0.00% 16.00 31/01/2022 31/01/2022 1.00 1.00 16.00 16.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16 0 0 0 16 11.2 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1446 13.01.02.05.02 S4 I SELLADO DE JUNTA TIPO 2 m 0.00% 13.00 31/01/2022 31/01/2022 1.00 1.00 13.00 13.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 0 0 0 13 9.1 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1447 13.01.02.05.03 S4 I SELLADO DE JUNTA TIPO 3 m 0.00% 9.00 31/01/2022 31/01/2022 1.00 1.00 9.00 9.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 0 0 0 9 6.3 1.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1448 13.01.02.05.04 S4 I JUNTA TIPICA EN PEDESTAL m 0.00% 7.00 31/01/2022 31/01/2022 1.00 1.00 7.00 7.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 0 0 0 7 3.675 0.92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1449 13.01.03 S4 I BRUÑAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1450 13.01.03.01 S4 I BRUÑADO EN RAMPA m2 0.00% 13.00 14/01/2022 14/01/2022 1.00 1.00 13.00 13.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13 0 0 0 0 0 0 13 8.06 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1451 13.01.04 S4 I APLICACIÓN DE GROUT E IMPERMEABILIZANTE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1452 13.01.04.01 S4 I GROUT PARA PEDESTAL E=2.5CM m2 0.00% 1.00 01/01/2022 10/01/2022 10.00 10.00 0.10 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0.1 0.1 0.1 0.1 0.1 0.1 0.6 6.5639471 0.6 0.1 0.1 0.1 0.1 0 0 0 0.4 4.37596472 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1453 13.01.05 S4 I ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1454 13.01.05.01 S4 I DESMONTAJE DE ESTRUCTURAS METALICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1455 13.01.05.01.01 S4 I DESMONTAJE COBERTURA DE CALAMINA GALVANIZADA m2 100.00% 0.00 10.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1456 13.01.05.01.02 S4 I DESMONTAJE DE CORREAS REUTILIZABLES kg 100.00% 0.00 10.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1457 13.01.05.01.03 S4 I DESMONTAJE DE TIJERALES REUTILIZABLES kg 100.00% 0.00 10.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1458 13.01.05.01.04 S4 I DESMONTAJE DE VIGAS DE ARRIOSTRE REUTILIZABLES kg 100.00% 0.00 10.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1459 13.01.05.01.05 S4 I DESMONTAJE DE TEMPLADORES REUTILIZABLES kg 100.00% 0.00 10.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1460 13.01.05.01.06 S4 I DESMONTAJE DE COLUMNAS REUTILIZABLES kg 100.00% 0.00 10.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1461 13.01.05.02 S4 I MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1462 13.01.05.02.01 S4 I INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS REUTILI kg 0.00% 677.00 25/12/2021 31/12/2021 7.00 7.00 96.71 677.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 96.714 96.714 96.714 96.714 96.714 96.714 580 33.3924 0.86 96.714 0 0 0 0 0 0 96.7 5.5654001 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1463 13.01.05.02.02 S4 I INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES REUTILIZ kg 0.00% 343.00 25/12/2021 31/12/2021 7.00 7.00 49.00 343.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 49 49 49 49 49 49 294 22.53833 0.87 49 0 0 0 0 0 0 49 3.7563884 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1464 13.01.05.02.03 S4 I INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTR kg 0.00% 331.00 25/12/2021 31/12/2021 7.00 7.00 47.29 331.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 47.286 47.286 47.286 47.286 47.286 47.286 284 16.32627 0.86 47.286 0 0 0 0 0 0 47.3 2.7210449 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1465 13.01.05.02.04 S4 I INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS REUTILIZA kg 0.00% 1,258.00 25/12/2021 31/12/2021 7.00 7.00 179.71 1258.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 179.71 179.71 179.71 179.71 179.71 179.71 1078 103.46025 0.86 179.71 0 0 0 0 0 0 180 17.243375 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1466 13.01.05.02.05 S4 I INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES REUT kg 0.00% 198.00 25/12/2021 31/12/2021 7.00 7.00 28.29 198.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 28.286 28.286 28.286 28.286 28.286 28.286 170 19.532335 0.85 28.286 0 0 0 0 0 0 28.3 3.2553891 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1467 13.01.05.02.06 S4 I INSTALACIÓN E IZAJE DE COBERTURA DE CALAMINA GALVANIZADA R m2 0.00% 107.00 25/12/2021 31/12/2021 7.00 7.00 15.29 107.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 15.286 15.286 15.286 15.286 15.286 15.286 91.7 45.857143 0.85 15.286 0 0 0 0 0 0 15.3 7.6428571 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1468 13.01.05.03 S4 I INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1469 13.01.05.03.01 S4 I INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y A kg 0.00% 141.00 25/12/2021 03/01/2022 10.00 10.00 14.10 141.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 14.1 14.1 14.1 14.1 14.1 14.1 84.6 7.4940945 0.62 14.1 14.1 14.1 14.1 0 0 0 56.4 4.996063 0.42 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1470 13.01.05.04 S4 I LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1471 13.01.05.04.01 S4 I LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 100.00% 0.00 26/11/2021 28/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1472 13.01.05.05 S4 I PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1473 13.01.05.05.01 S4 I PINTURA DE ELEMENTOS METALICOS m2 100.00% 0.00 26/11/2021 28/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1474 13.01.05.06 S4 I TRANSPORTE DE ELEMENTOS ESTRUCTURALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1475 13.01.05.06.01 S4 I TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 100.00% 0.00 26/11/2021 30/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1476 13.02 S4 I DISCIPLINA: INSTALACIONES SANITARIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1477 13.02.01 S4 I TUBERIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1478 13.02.01.01 S4 I MONTANTE DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1479 13.02.01.01.01 S4 I 975-SD-4"-P0E03U-100010 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1480 13.02.01.01.01.01 S4 I Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 7.00 05/01/2022 11/01/2022 7.00 7.00 1.00 7.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 2 2.1428571 0.27 1 1 1 1 1 0 0 5 5.35714286 0.67 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1481 13.02.01.01.01.02 S4 I El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 05/01/2022 11/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0.1429 0.1429 0.29 0 ### 0.1429 0.1429 0.1429 0.1429 0.1429 0 0 0.7143 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1482 13.02.01.01.02 S4 I 975-SD-4"-P0E03U-100012 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1483 13.02.01.01.02.01 S4 I Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 7.00 05/01/2022 11/01/2022 7.00 7.00 1.00 7.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 2 2.1428571 0.27 1 1 1 1 1 0 0 5 5.35714286 0.67 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1484 13.02.01.01.02.02 S4 I El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 05/01/2022 11/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0.1429 0.1429 0.29 0 ### 0.1429 0.1429 0.1429 0.1429 0.1429 0 0 0.7143 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1485 13.02.02 S4 I MECÁNICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1486 13.02.02.01 S4 I CANALETAS DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1487 13.02.02.01.01 S4 I ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 0.00% 23.00 01/01/2022 07/01/2022 7.00 7.00 3.29 23.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 3.2857 3.2857 3.2857 3.2857 3.2857 3.2857 19.7 8.0357143 0.89 3.2857 0 0 0 0 0 0 3.2857 1.33928571 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1488 13.02.02.01.02 S4 I ACERO ESTRUCTURAL PLANCHA FIERRO GALVANIZADO E=0.8 MM kg 0.00% 177.00 01/01/2022 07/01/2022 7.00 7.00 25.29 177.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 25.286 25.286 25.286 25.286 25.286 25.286 152 56.25 0.85 25.286 0 0 0 0 0 0 25.286 9.375 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1489 13.02.02.02 S4 I SOPORTERIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1490 13.02.02.02.01 S4 I GS1-4", Tubería 975-SD-4"-P0E03U-100010 & 100012 pza 0.00% 6.00 01/01/2022 07/01/2022 7.00 7.00 0.86 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0.8571 0.8571 0.8571 0.8571 0.8571 0.8571 5.14 15.428571 0.86 0.8571 0 0 0 0 0 0 0.8571 2.57142857 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1491 14 S4 K1 MÓDULO K1: SISTEMA DE COLECCIÓN DE LODOS Y GRASAS (1) 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1492 14.01 S4 K1 DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1493 14.01.01 S4 K1 MOVIMIENTO DE TIERRAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1494 14.01.01.01 S4 K1 EXCAVACION MASIVA CON EQUIPO m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1495 14.01.01.02 S4 K1 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.00 17/11/2021 17/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1496 14.01.01.03 S4 K1 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1497 14.01.01.04 S4 K1 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1498 14.01.01.05 S4 K1 MEJORAMIENTO CON MATERIAL GRANULAR m3 100.00% 0.00 17/11/2021 17/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1499 14.01.01.06 S4 K1 TRANSPORTE DE MATERIAL FINO APTO PARA RELLENO DM < = 1 KM m3 -KM 100.00% 0.00 17/11/2021 17/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1500 14.01.01.07 S4 K1 TRANSPORTE DE MATERIAL FINO APTO PARA RELLENO DM > 1 KM (Hasta
m3 -KM 100.00% 0.00 17/11/2021 17/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1501 14.01.01.08 S4 K1 MEJORAMIENTO CON MATERIAL FINO DE PRESTAMO m3 100.00% 0.00 17/11/2021 17/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1502 14.01.01.09 S4 K1 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1503 14.01.01.10 S4 K1 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1504 14.01.01.11 S4 K1 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1505 14.01.03 S4 K1 CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1506 14.01.02.01 S4 K1 CONCRETO SIMPLE PARA LOSAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1507 14.01.02.01.01 S4 K1 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 0.00 28.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1508 15.01.03 S3 K2 CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1509 14.01.03.01 S4 K1 LOSA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1510 14.01.03.01.01 S4 K1 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 12/11/2021 16/11/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1511 14.01.03.01.02 S4 K1 ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 0.00 22/10/2021 25/10/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1512 14.01.03.01.03 S4 K1 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 22/10/2021 25/10/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1513 14.01.03.01 S4 K1 MUROS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1514 14.01.03.01.01 S4 K1 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 12/11/2021 12/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1515 14.01.03.01.02 S4 K1 ENCOFRADO CARAVISTA Y DESENCOFRADO DE MURO m2 100.00% 0.00 28.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1516 14.01.03.01.03 S4 K1 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 28.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1517 14.01.03.01 S4 K1 CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1518 14.01.03.01.01 S4 K1 CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.00 20/11/2021 22/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1519 14.01.03.01 S4 K1 SELLADO DE JUNTAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1520 14.01.03.01.01 S4 K1 SELLADO DE JUNTA TIPO 3 m 100.00% 0.00 14/12/2021 14/12/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1521 14.01.04 S4 K1 GEOMEMBRANA Y GEOTEXTIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1522 14.01.04.01 S4 K1 SUMINISTRO E INSTALACION GEOMEMBRANA E=1.5MM m2 0.00% 18.00 24/12/2021 28/12/2021 5.00 5.00 3.60 18.00 X X 0 0 0 0 0 0 0 0 0.00 0 3.6 3.6 3.6 3.6 3.6 0 0 18 6.1506 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1523 14.01.04.02 S4 K1 SUMINISTRO E INSTALACION GEODREN TRIPLANAR m2 0.00% 18.00 24/12/2021 28/12/2021 5.00 5.00 3.60 18.00 X X 0 0 0 0 0 0 0 0 0.00 0 3.6 3.6 3.6 3.6 3.6 0 0 18 9.225 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1524 14.01.05 S4 K1 PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1525 14.01.05.01 S4 K1 PINTURA DE LOSA DE CONCRETO m2 0.00% 24.00 29/12/2021 29/12/2021 1.00 1.00 24.00 24.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 24 0 24 25.2 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1526 14.01.06 S4 K1 CARPINTERIA METALICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1527 14.01.06.01 S4 K1 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 0.60m x 0.60m INC. A und 100.00% 0.00 17/11/2021 17/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1528 14.01.06.02 S4 K1 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 1.05m x 1.05m INC. A und 100.00% 0.00 17/11/2021 17/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1529 14.01.06.03 S4 K1 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 0.70m x 1.30m INC. A und 100.00% 0.00 17/11/2021 17/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1530 14.01.06.04 S4 K1 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 0.70m x 0.70m INC. A und 100.00% 0.00 17/11/2021 17/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1531 14.01.06.05 S4 K1 SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.305m m 100.00% 0.00 17/11/2021 17/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1532 14.02 S4 K1 DISCIPLINA: INSTALACIONES SANITARIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1533 14.02.01 S4 K1 TUBERIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1534 14.02.01.01 S4 K1 SISTEMA DE BOMBEO Y DRENES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1535 14.02.01.01.01 S4 K1 INSTALACIÓN DE TUBERÍAS P/SIST. BOMBEO Y ACCESORIOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1536 14.02.01.01.01.01 S4 K1 TUBERIA PVC SAP 6" m 0.00% 2.37 24/12/2021 30/12/2021 7.00 7.00 0.34 2.37 X X 0 0 0 0 0 0 0 0 0.00 0 0.3386 0.3386 0.3386 0.3386 0.3386 0.3386 0.3386 2.37 26.921875 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1537 14.02.01.01.01.02 S4 K1 Codo PVC-SAP 6"x90° und 0.00% 1.00 24/12/2021 30/12/2021 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1538 14.02.01.01.01.03 S4 K1 TEE PVC-SAP 6" und 0.00% 1.00 24/12/2021 30/12/2021 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1539 14.02.01.01.01.04 S4 K1 TUBERIA HDPE 4" m 0.00% 0.29 24/12/2021 30/12/2021 7.00 7.00 0.04 0.29 X X 0 0 0 0 0 0 0 0 0.00 0 0.0414 0.0414 0.0414 0.0414 0.0414 0.0414 0.0414 0.29 26.921875 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1540 14.02.01.01.01.05 S4 K1 TUBERIA HDPE PERFORADA 4" m 0.00% 8.00 24/12/2021 30/12/2021 7.00 7.00 1.14 8.00 X X 0 0 0 0 0 0 0 0 0.00 0 1.1429 1.1429 1.1429 1.1429 1.1429 1.1429 1.1429 8 26.921875 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1541 14.02.01.01.01.06 S4 K1 CODO HDPE 4"x45° und 0.00% 3.00 24/12/2021 30/12/2021 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0 0 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 3 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1542 14.02.01.01.01.07 S4 K1 YEE HDPE 4" und 0.00% 1.00 24/12/2021 30/12/2021 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1543 14.02.01.01.01.08 S4 K1 TUBERIA PVC SAP 4" m 0.00% 12.60 24/12/2021 30/12/2021 7.00 7.00 1.80 12.60 X X 0 0 0 0 0 0 0 0 0.00 0 1.8 1.8 1.8 1.8 1.8 1.8 1.8 12.6 26.921875 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1544 14.02.01.01.01.09 S4 K1 NIPLE PVC-SAP 0.20m x 4" und 0.00% 9.00 24/12/2021 30/12/2021 7.00 7.00 1.29 9.00 X X 0 0 0 0 0 0 0 0 0 0 1.2857 1.2857 1.2857 1.2857 1.2857 1.2857 1.2857 9 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1545 14.02.01.01.01.10 S4 K1 CODO PVC-SAP 4"x90° und 0.00% 9.00 24/12/2021 30/12/2021 7.00 7.00 1.29 9.00 X X 0 0 0 0 0 0 0 0 0 0 1.2857 1.2857 1.2857 1.2857 1.2857 1.2857 1.2857 9 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1546 14.02.01.01.01.11 S4 K1 TEE PVC-SAP 4" und 0.00% 9.00 24/12/2021 30/12/2021 7.00 7.00 1.29 9.00 X X 0 0 0 0 0 0 0 0 0 0 1.2857 1.2857 1.2857 1.2857 1.2857 1.2857 1.2857 9 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1547 14.02.01.01.02 S4 K1 INSTALACIÓN DE VÁLVULAS Ø6" Y ACCESORIOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1548 14.02.01.01.02.01 S4 K1 VALVULA MARIPOSA DIN 3202 C/PALANCA Ø6" pza 0.00% 1.00 24/12/2021 02/01/2022 10.00 10.00 0.10 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.7 10.875 0.68 0.1 0.1 0.1 0 0 0 0 0.3 4.6607143 0.29 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1549 14.02.01.01.02.02 S4 K1 UNION ADAPTADOR DE BRIDA PARA HDPE Ø6" und 0.00% 2.00 24/12/2021 02/01/2022 10.00 10.00 0.20 2.00 X X 0 0 0 0 0 0 0 0 0 0 0.2 0.2 0.2 0.2 0.2 0.2 0.2 1.4 0 ### 0.2 0.2 0.2 0 0 0 0 0.6 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1550 14.02.01.01.02.03 S4 K1 BRIDA PARA TUBERIA HDPE 6" und 0.00% 2.00 24/12/2021 02/01/2022 10.00 10.00 0.20 2.00 X X 0 0 0 0 0 0 0 0 0 0 0.2 0.2 0.2 0.2 0.2 0.2 0.2 1.4 0 ### 0.2 0.2 0.2 0 0 0 0 0.6 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1551 14.02.02 S4 K1 MECÁNICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1552 14.02.02.01 S4 K1 EQUIPOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1553 14.02.02.01.01 S4 K1 SUMINISTRO E INSTALACIÓN DE BOMBA PORTATIL NEUMÁTICA SUME und 0.00% 1.00 03/01/2022 06/01/2022 4.00 4.00 0.25 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.25 0.25 0.25 0.25 1 15 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1554 14.02.02.01.02 S4 K1 SUMINISTRO E INSTALACION DE GRUA PORTICO Y TECLE MECANICO und 0.00% 1.00 03/01/2022 06/01/2022 4.00 4.00 0.25 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.25 0.25 0.25 0.25 1 15 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1555 15 S3 K2 MÓDULO K2: SISTEMA DE COLECCIÓN DE LODOS Y GRASAS (2) 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1556 15.01 S3 K2 DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1557 15.01.01 S3 K2 MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1558 15.01.01.01 S3 K2 EXCAVACION MASIVA CON EQUIPO m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1559 15.01.01.02 S3 K2 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1560 15.01.01.03 S3 K2 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1561 15.01.01.04 S3 K2 TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1562 15.01.01.05 S3 K2 MEJORAMIENTO CON MATERIAL GRANULAR m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1563 15.01.01.06 S3 K2 TRANSPORTE DE MATERIAL FINO APTO PARA RELLENO DM < = 1 KM m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1564 15.01.01.07 S3 K2 TRANSPORTE DE MATERIAL FINO APTO PARA RELLENO DM > 1 KM (Hasta
m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1565 15.01.01.08 S3 K2 MEJORAMIENTO CON MATERIAL FINO DE PRESTAMO m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1566 15.01.01.09 S3 K2 ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1567 15.01.01.10 S3 K2 ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1568 15.01.01.11 S3 K2 APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1569 16.01.03 S3 K2 CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1570 15.01.02.01 S3 K2 CONCRETO SIMPLE PARA LOSAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1571 15.01.02.01.01 S3 K2 COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 0.00 22.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1572 17.01.01 S3 K2 CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1573 15.01.03.01 S3 K2 LOSA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1574 15.01.03.01.01 S3 K2 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1575 15.01.03.01.02 S3 K2 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1576 15.01.03.02 S3 K2 MUROS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1577 15.01.03.02.01 S3 K2 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1578 15.01.03.02.02 S3 K2 ENCOFRADO CARAVISTA Y DESENCOFRADO DE MURO m2 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1579 15.01.03.02.03 S3 K2 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1580 15.01.03.03 S3 K2 RAMPA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1581 15.01.03.03.01 S3 K2 COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 19/11/2021 19/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1582 15.01.03.03.02 S3 K2 SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 01/11/2021 02/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1583 15.01.03.04 S3 K2 CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1584 15.01.03.04.01 S3 K2 CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.00 23/11/2021 25/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1585 15.01.03.05 S3 K2 SELLADO DE JUNTAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1586 15.01.03.05.01 S3 K2 SELLADO DE JUNTA TIPO 1 m 100.00% 0.00 19/11/2021 19/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1587 15.01.03.05.02 S3 K2 SELLADO DE JUNTA TIPO 3 m 100.00% 0.00 19/11/2021 19/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1588 15.01.04 S3 K2 BRUÑAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1589 15.01.04.01 S3 K2 BRUÑADO EN RAMPA m2 100.00% 0.00 19/11/2021 19/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1590 15.01.05 S3 K2 GEOMEMBRANA Y GEOTEXTIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1591 15.01.05.01 S3 K2 SUMINISTRO E INSTALACION GEOMEMBRANA E=1.5MM m2 0.00% 12.00 24/12/2021 24/12/2021 1.00 1.00 12.00 12.00 X X 0 0 0 0 0 0 0 0 0.00 0 12 0 0 0 0 0 0 12 4.1004 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1592 15.01.05.02 S3 K2 SUMINISTRO E INSTALACION GEODREN TRIPLANAR m2 0.00% 12.00 24/12/2021 24/12/2021 1.00 1.00 12.00 12.00 X X 0 0 0 0 0 0 0 0 0.00 0 12 0 0 0 0 0 0 12 6.15 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1593 15.01.06 S3 K2 CARPINTERIA METALICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1594 15.01.06.01 S3 K2 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 0.60m x 0.60m INC. A und 100.00% 0.00 20/11/2021 20/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1595 15.01.06.02 S3 K2 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 1.05m x 1.05m INC. A und 100.00% 0.00 20/11/2021 20/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1596 15.01.06.03 S3 K2 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 1.35m x 0.65m INC. A und 100.00% 0.00 21/11/2021 21/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1597 15.01.06.04 S3 K2 SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 0.70m x 0.50m INC. A und 100.00% 0.00 21/11/2021 21/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1598 15.01.06.05 S3 K2 SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.305m m 100.00% 0.00 22/11/2021 22/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1599 15.02 S3 K2 DISCIPLINA: INSTALACIONES SANITARIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1600 15.02.01 S3 K2 TUBERIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1601 15.02.01.01 S3 K2 SISTEMA DE BOMBEO Y DRENES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1602 15.02.01.01.01 S3 K2 INSTALACIÓN DE TUBERÍAS P/SIST. BOMBEO Y ACCESORIOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1603 15.02.01.01.01.01 S3 K2 TUBERIA PVC SAP 6" m 0.00% 2.00 02/01/2022 08/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2857 0.2857 0.2857 0.2857 0.2857 1.43 12.053571 0.71 0.2857 0.2857 0 0 0 0 0 0.5714 4.82142857 0.28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1604 15.02.01.01.01.02 S3 K2 TEE PVC-SAP 6" und 0.00% 1.00 02/01/2022 08/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.71 0 ### 0.1429 0.1429 0 0 0 0 0 0.2857 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1605 15.02.01.01.01.03 S3 K2 TUBERIA HDPE 4" m 0.00% 1.00 02/01/2022 08/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.71 12.053571 0.71 0.1429 0.1429 0 0 0 0 0 0.2857 4.82142857 0.28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1606 15.02.01.01.01.04 S3 K2 TUBERIA HDPE PERFORADA 4" m 0.00% 2.00 02/01/2022 08/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2857 0.2857 0.2857 0.2857 0.2857 1.43 12.053571 0.71 0.2857 0.2857 0 0 0 0 0 0.5714 4.82142857 0.28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1607 15.02.01.01.01.05 S3 K2 CODO HDPE 4"x90° und 0.00% 3.00 02/01/2022 08/01/2022 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0.4286 0.4286 0.4286 0.4286 0.4286 2.14 0 ### 0.4286 0.4286 0 0 0 0 0 0.8571 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1608 15.02.01.01.01.06 S3 K2 TUBERIA PVC SAP 4" m 0.00% 7.00 02/01/2022 08/01/2022 7.00 7.00 1.00 7.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 5 12.053571 0.71 1 1 0 0 0 0 0 2 4.82142857 0.28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1609 15.02.01.01.01.07 S3 K2 NIPLE PVC-SAP 0.20m x 4" und 0.00% 2.00 02/01/2022 08/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0.2857 0.2857 0.2857 0.2857 0.2857 1.43 0 ### 0.2857 0.2857 0 0 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1610 15.02.01.01.01.08 S3 K2 CODO PVC-SAP 4"x90° und 0.00% 3.00 02/01/2022 08/01/2022 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0.4286 0.4286 0.4286 0.4286 0.4286 2.14 0 ### 0.4286 0.4286 0 0 0 0 0 0.8571 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1611 15.02.01.01.01.09 S3 K2 TEE PVC-SAP 4" und 0.00% 2.00 02/01/2022 08/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0.2857 0.2857 0.2857 0.2857 0.2857 1.43 0 ### 0.2857 0.2857 0 0 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1612 15.02.01.01.02 S3 K2 INSTALACIÓN DE VÁLVULAS Ø6" Y ACCESORIOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1613 15.02.01.01.02.01 S3 K2 VALVULA MARIPOSA DIN 3202 C/PALANCA Ø6" pza 0.00% 1.00 02/01/2022 06/01/2022 5.00 5.00 0.20 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2 0.2 0.2 0.2 0.2 1 15.535714 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1614 15.02.01.01.02.02 S3 K2 UNION ADAPTADOR DE BRIDA PARA HDPE Ø6" und 0.00% 2.00 02/01/2022 06/01/2022 5.00 5.00 0.40 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0.4 0.4 0.4 0.4 0.4 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1615 15.02.01.01.02.03 S3 K2 BRIDA PARA TUBERIA HDPE 6" und 0.00% 2.00 02/01/2022 06/01/2022 5.00 5.00 0.40 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0.4 0.4 0.4 0.4 0.4 2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1616 16 S3 L MÓDULO L: RAMPA DEL SISTEMA DE TRANSFERENCIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1617 16.01 S3 L DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1618 16.01.01 S3 L MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1619 16.01.01.01 S3 L EXCAVACIÓN DE ZANJAS P/ESTRUCTURAS m3 0.00% 282.00 14/01/2022 20/01/2022 7.00 7.00 40.29 282.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 40.286 40.286 40.286 40.286 40.286 40.286 40.286 282 409.5714 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1620 16.01.01.02 S3 L REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.00% 481.00 15/01/2022 16/01/2022 2.00 2.00 240.50 481.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 240.5 240.5 0 0 0 0 481 61.3275 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1621 16.01.01.03 S3 L TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.00 15/01/2022 15/01/2022 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1622 16.01.01.04 S3 L TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 100.00% 0.00 15/01/2022 16/01/2022 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1623 16.01.01.05 S3 L RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 0.00% 13.00 16/01/2022 19/01/2022 4.00 4.00 3.25 13.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.25 3.25 3.25 3.25 0 13 26.325 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1624 16.01.01.06 S3 L MEJORAMIENTO CON MATERIAL GRANULAR m3 0.00% 63.00 16/01/2022 19/01/2022 4.00 4.00 15.75 63.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15.75 15.75 15.75 15.75 0 63 39.06 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1625 16.01.01.07 S3 L TRANSPORTE DE MATERIAL FINO APTO PARA RELLENO DM < = 1 KM m3 -KM 0.00% 4.00 16/01/2022 19/01/2022 4.00 4.00 1.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 4 0.62 0.62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1626 16.01.01.08 S3 L TRANSPORTE DE MATERIAL FINO APTO PARA RELLENO DM > 1 KM (Hasta
m3 -KM 0.00% 18.00 16/01/2022 19/01/2022 4.00 4.00 4.50 18.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.5 4.5 4.5 4.5 0 18 0.66 0.66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1627 16.01.01.09 S3 L MEJORAMIENTO CON MATERIAL FINO DE PRESTAMO m3 0.00% 3.00 16/01/2022 19/01/2022 4.00 4.00 0.75 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.75 0.75 0.75 0.75 0 3 1.86 0.93 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1628 16.01.01.10 S3 L ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.00% 336.00 14/01/2022 17/01/2022 4.00 4.00 84.00 336.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 84 84 84 84 0 0 0 336 38.5728 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1629 16.01.01.11 S3 L ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.00% 671.00 14/01/2022 17/01/2022 4.00 4.00 167.75 671.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 167.75 167.75 167.75 167.75 0 0 0 671 31.3357 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1630 16.01.01.12 S3 L APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.00% 336.00 14/01/2022 17/01/2022 4.00 4.00 84.00 336.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 84 84 84 84 0 0 0 336 78.90909 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1631 18.01.01 S3 L CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1632 16.01.02.01 S3 L CONCRETO SIMPLE PARA DADOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1633 16.01.02.01.01 S3 L COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 0.00% 1.00 17/01/2022 17/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 6.1765 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1634 16.01.02.01.02 S3 L COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 1.00 18/01/2022 18/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 5.8333 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1635 16.01.02.02 S3 L CONCRETO SIMPLE PARA LOSAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1636 16.01.02.02.01 S3 L COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 0.00% 18.00 18/01/2022 18/01/2022 1.00 1.00 18.00 18.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18 0 0 18 111.177 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1637 19.01.03 S3 L CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1638 16.01.03.01 S3 L LOSA PISO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1639 16.01.03.01.01 S3 L COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 65.00 24/01/2022 24/01/2022 1.00 1.00 65.00 65.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 65 0 0 0 65 379.1645 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1640 16.01.03.01.02 S3 L ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 0.00% 100.00 22/01/2022 23/01/2022 2.00 2.00 50.00 100.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50 50 0 0 0 0 100 247.0588 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1641 16.01.03.01.03 S3 L SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 60.00% 5,486.40 18/01/2022 21/01/2022 4.00 4.00 1,371.60 5486.40 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1371.6 1371.6 1371.6 4115 480.06 0.3 1371.6 0 0 0 0 0 0 1372 160.02 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1642 LOSA TECHO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1643 S3 L COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 60.00 15/02/2022 15/02/2022 1.00 60.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 0 0 60 349.998 1 0 0 0 0 0 0 0 0 - 0
1644 S3 L ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 0.00% 52.00 09/02/2022 11/02/2022 3.00 52.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17.333 17.333 34.785.64706 0.67 17.333 0 0 0 0 0 0 17.3 42.8235 0.33 0 0 0 0 0 0 0 0 - 0
1645 S3 L SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 0.00 12/02/2022 14/02/2022 3.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1646 16.01.03.02 S3 L MUROS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1647 16.01.03.02.01 S3 L COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 79.00 08/02/2022 08/02/2022 1.00 1.00 79.00 79.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 79 0 0 79460.8307 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1648 16.01.03.02.02 S3 L ENCOFRADO CARAVISTA Y DESENCOFRADO DE MURO m2 0.00% 521.00 31/01/2022 07/02/2022 8.00 8.00 65.13 521.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 65.125 65.125 65.125 65.125 261 911.75 0.5 65.125 65.125 65.125 65.125 0 0 0 261 911.75 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1649 16.01.03.02.03 S3 L SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 60.00% 2,695.20 27/01/2022 30/01/2022 4.00 4.00 673.80 2695.20 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 673.8 674 78.61 0.1 673.8 673.8 673.8 0 0 0 0 2021 235.83 0.3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1650 16.01.03.04 S3 L VEREDA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1651 16.01.03.04.01 S3 L COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 8.00 18/02/2022 18/02/2022 1.00 1.00 8.00 8.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 0 0 0 0 0 0 8 46.67 0.9929
1652 16.01.03.04.02 S3 L ENCOFRADO CARAVISTA Y DESENCOFRADO DE VEREDA m2 0.00% 12.00 17/02/2022 17/02/2022 1.00 1.00 12.00 12.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 12 29.6471 0.99 0 0 0 0 0 0 0 0 - 0
1653 16.01.03.04.03 S3 L SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 60.00% 86.00 16/02/2022 16/02/2022 1.00 1.00 86.00 86.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 86 0 86 10.0333 0.4 0 0 0 0 0 0 0 0 - 0
1654 16.01.03.05 S3 L RAMPA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1655 16.01.03.05.01 S3 L COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 4.00 18/02/2022 18/02/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 4 23.33 1.01449
1656 16.01.03.05.02 S3 L ENCOFRADO CARAVISTA Y DESENCOFRADO DE RAMPA m2 0.00% 2.00 17/02/2022 17/02/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 4.94118 0.99 0 0 0 0 0 0 0 0 - 0
1657 16.01.03.05.03 S3 L SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 60.00% 54.40 16/02/2022 16/02/2022 1.00 1.00 54.40 54.40 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 54.4 0 54.4 6.34667 0.4 0 0 0 0 0 0 0 0 - 0
1658 16.01.03.06 S3 L CANAL DE DRENAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1659 16.01.03.06.01 S3 L COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 22.00 23/02/2022 23/02/2022 1.00 1.00 22.00 22.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22 0 22 128.33 1.0026
1660 16.01.03.06.02 S3 L ENCOFRADO CARAVISTA Y DESENCOFRADO DE CANAL DE DRENAJE m2 0.00% 79.00 21/02/2022 22/02/2022 2.00 2.00 39.50 79.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 39.5 39.5 0 0 79 221.20 1.0009
1661 16.01.03.06.03 S3 L SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 60.00% 579.20 19/02/2022 20/02/2022 2.00 2.00 289.60 579.20 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 289.6 289.6 0 0 0 0 579 67.57 0.39984
1662 16.01.03.07 S3 L CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1663 16.01.03.07.01 S3 L CURADO DE CONCRETO CON ANTISOL m2 0.00% 993.00 26/02/2022 28/02/2022 3.00 3.00 331.00 0.00 -993 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1664 16.01.03.08 S3 L SELLADO DE JUNTAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1665 16.01.03.08.01 S3 L SELLADO DE JUNTA TIPO 1 m 0.00% 34.00 22/02/2022 22/02/2022 1.00 1.00 34.00 34.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 34 0 0 34 23.80 0.99167
1666 16.01.03.08.02 S3 L SELLADO DE JUNTA TIPO 2 m 0.00% 3.00 22/02/2022 22/02/2022 1.00 1.00 3.00 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 3 2.10 1.05
1667 16.01.03.08.03 S3 L SELLADO DE JUNTA TIPO 3 m 0.00% 36.00 22/02/2022 22/02/2022 1.00 1.00 36.00 36.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 36 0 0 36 25.20 1.008
1668 16.01.04 S3 L BRUÑAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1669 16.01.04.01 S3 L BRUÑADO EN RAMPA m2 0.00% 133.00 18/02/2022 18/02/2022 1.00 1.00 133.00 133.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 133 0 0 0 0 0 0 133 82.46 1.00561
1670 16.01.05 S3 L GEOMEMBRANA Y GEOTEXTIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1671 16.01.05.01 S3 L SUMINISTRO E INSTALACION GEOMEMBRANA E=1.5MM m2 0.00% 60.00 24/01/2022 24/01/2022 1.00 1.00 60.00 60.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 0 0 0 60 20.502 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1672 16.01.05.02 S3 L SUMINISTRO E INSTALACION GEODREN TRIPLANAR m2 0.00% 60.00 24/01/2022 24/01/2022 1.00 1.00 60.00 60.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 0 0 0 60 30.75 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1673 16.01.06 S3 L APLICACIÓN DE GROUT E IMPERMEABILIZANTE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1674 16.01.06.01 S3 L GROUT PARA PEDESTAL E=2.5CM m2 0.00% 2.00 03/02/2022 07/02/2022 5.00 5.00 0.40 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4 0.4 4.3759647 0.2 0.4 0.4 0.4 0.4 0 0 0 1.617.50386 0.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1675 16.01.07 S3 L CARPINTERIA METALICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1676 16.01.07.01 S3 L SUMINISTRO E INSTALACIÓN DE PUERTA P08 INC. INCACCESORIOS und 60.00% 0.40 15/02/2022 19/02/2022 5.00 5.00 0.08 0.40 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.08 0.08 0.08 0.24 2.56 0.23 0.08 0.08 0 0 0 0 0 0.16 1.71 0.15515
1677 16.01.07.02 S3 L SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.50m m 59.54% 44.10 15/02/2022 19/02/2022 5.00 5.00 8.82 44.10 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.82 8.82 8.82 26.5 72.03 0.24 8.82 8.82 0 0 0 0 0 17.6 48.02 0.16168
1678 16.01.08 S3 L ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1679 16.01.08.01 S3 L DESMONTAJE DE ESTRUCTURAS METALICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1680 16.01.08.01.01 S3 L DESMONTAJE DE ESCALERA REUTILIZABLE kg 0.00% 1,961.00 25/01/2022 25/01/2022 1.00 1.00 1,961.00 1961.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1961 0 0 1961 64.45946 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1681 16.01.08.02 S3 L MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1682 16.01.08.02.01 S3 L MONTAJE DE ESCALERA REUTILIZABLES kg 0.00% 1,961.00 02/02/2022 02/02/2022 1.00 1.00 1,961.00 1961.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1961 0 1961 125.34801 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1683 16.01.08.03 S3 L MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1684 16.01.08.03.01 S3 L SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL BARANDAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1685 16.01.08.03.01.01 S3 L BARANDA TUBERÍA ESTÁNDAR 1 1/4" kg 60.00% 162.40 22/02/2022 28/02/2022 7.00 7.00 23.20 69.60 -92.8 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23.2 23.2 23.2 69.6 7.62 0.17319
1686 16.01.08.03.01.02 S3 L PARANTE TIPICO DE PLATINA 2 1/2"X1/2" kg 60.00% 88.00 22/02/2022 28/02/2022 7.00 7.00 12.57 37.71 -50.29 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12.571 12.571 12.571 37.7 4.82 0.17219
1687 16.01.08.03.01.03 S3 L TUBO ESTÁNDAR 1 1/2" kg 0.00% 43.00 22/02/2022 28/02/2022 7.00 7.00 6.14 18.43 -24.57 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.1429 6.1429 6.1429 18.4 2.02 0.40355
1688 16.01.08.03.01.04 S3 L TUBO ESTÁNDAR 2" Ø kg 3.02% 836.96 22/02/2022 28/02/2022 7.00 7.00 119.57 358.70 -478.26 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 119.57 119.57 119.57 359 30.75 0.41548
1689 16.01.08.03.01.05 S3 L PLATINA 1/4"x90x90 kg 0.00% 12.00 22/02/2022 28/02/2022 7.00 7.00 1.71 5.14 -6.86 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.7143 1.7143 1.7143 5.14 0.66 0.32873
1690 16.01.08.03.01.06 S3 L GUARDACANTO DE PLANCHA DE 3/16" kg 60.00% 126.80 22/02/2022 28/02/2022 7.00 7.00 18.11 54.34 -72.46 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18.114 18.114 18.114 54.3 4.66 0.17252
1691 16.01.08.03.01.07 S3 L PLANCHA TAPÓN DE 1/8" kg 60.00% 0.80 22/02/2022 28/02/2022 7.00 7.00 0.11 0.34 -0.46 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1143 0.1143 0.1143 0.34 0.03 #DIV/0!
1692 16.01.08.03.02 S3 L INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1693 16.01.08.03.02.01 S3 L ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=5/8" kg 0.00% 12.00 22/02/2022 28/02/2022 7.00 7.00 1.71 5.14 -6.86 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.7143 1.7143 1.7143 5.14 0.90 0.45
1694 16.01.08.04 S3 L INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1695 16.01.08.04.01 S3 L INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y A kg 0.00% 192.00 02/02/2022 02/02/2022 1.00 1.00 192.00 192.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 192 0 192 17.007874 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1696 16.01.08.05 S3 L LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1697 16.01.08.05.01 S3 L LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 0.00% 107.00 25/01/2022 27/01/2022 3.00 3.00 35.67 107.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35.667 35.667 35.667 107 53.5 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1698 16.01.08.06 S3 L PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1699 16.01.08.06.01 S3 L PINTURA DE ELEMENTOS METALICOS m2 0.00% 150.00 26/01/2022 28/01/2022 3.00 3.00 50.00 150.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50 50 100 43.75 0.66 50 0 0 0 0 0 0 50 21.875 0.33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1700 16.01.08.07 S3 L TRANSPORTE DE ELEMENTOS ESTRUCTURALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1701 16.01.08.07.01 S3 L TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 0.00% 1,961.00 26/01/2022 01/02/2022 7.00 7.00 280.14 1961.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 280.14 280.14 560 9.212471 0.29 280.14 280.14 280.14 280.14 280.14 0 0 1401 23.031177 0.72 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1702 16.02 S3 L DISCIPLINA: INSTALACIONES ELÉCTRICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1703 16.02.01 S3 L SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1704 16.02.01.01 S3 L ARTEFACTO DE ALUMBRADO LITHONIA LIGHTING FEM L48 8000LM LPPF pto 0.00% 1.00 22/02/2022 28/02/2022 7.00 7.00 0.14 0.43 -0.57 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 3.12 0.44571
1705 16.02.01.02 S3 L SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE pto 0.00% 1.00 22/02/2022 24/02/2022 3.00 3.00 0.33 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3333 0.3333 0.3333 1 2.93 0.97777
1706 16.02.01.03 S3 L SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON 1286W pto 0.00% 1.00 22/02/2022 24/02/2022 3.00 3.00 0.33 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3333 0.3333 0.3333 1 1.76 0.88
1707 16.02.01.04 S3 L SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON 5462- pto 0.00% 2.00 22/02/2022 24/02/2022 3.00 3.00 0.67 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.6667 0.6667 0.6667 2 8.80 0.97778
1708 16.02.02 S3 L TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1709 16.02.02.01 S3 L SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1138 UND 0.00% 1.00 22/02/2022 28/02/2022 7.00 7.00 0.14 0.43 -0.57 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 38.58 0.42861
1710 16.02.02.02 S3 L SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-COA-961 und 0.00% 1.00 22/02/2022 28/02/2022 7.00 7.00 0.14 0.43 -0.57 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 25.71 0.42857
1711 16.02.03 S3 L CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1712 16.02.03.01 S3 L SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 22.00 22/02/2022 28/02/2022 7.00 7.00 3.14 9.43 -12.57 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.1429 3.1429 3.1429 9.43 7.17 0.42151
1713 16.02.03.02 S3 L SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 16.00 22/02/2022 28/02/2022 7.00 7.00 2.29 6.86 -9.14 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.2857 2.2857 2.2857 6.86 8.34 0.43886
1714 16.02.03.03 S3 L SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 23.00 22/02/2022 28/02/2022 7.00 7.00 3.29 9.86 -13.14 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.2857 3.2857 3.2857 9.86 8.90 0.42381
1715 16.02.04 S3 L CONDUCTORES Y CABLES DE ENERGIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1716 16.02.04.01 S3 L SUMINISTRO E INSTALACIÓN DE CABLE 2-1/c #12 AWG + GRD; XHHW-2, 0 m 0.00% 8.00 22/02/2022 28/02/2022 7.00 7.00 1.14 3.43 -4.57 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.1429 1.1429 1.1429 3.43 0.99 0.49474
1717 16.02.04.02 S3 L SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW M 0.00% 38.00 22/02/2022 28/02/2022 7.00 7.00 5.43 16.29 -21.71 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.4286 5.4286 5.4286 16.3 4.70 0.42728
1718 16.02.04.03 S3 L SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-4/c #12 AWG + GRD; XHHW m 0.00% 31.00 22/02/2022 28/02/2022 7.00 7.00 4.43 13.29 -17.71 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.4286 4.4286 4.4286 13.3 13.29 0.42857
1719 16.02.05 S3 L EQUIPOS ELÉCTRICOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1720 16.02.05.01 S3 L INSTALACIÓN DE EQUIPO 1 SISTEMA DE COMPACTACIÓN CON CAJA DE und 0.00% 1.00 22/02/2022 28/02/2022 7.00 7.00 0.14 0.43 -0.57 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 24.16 0.43135
1721 17 S3 M MÓDULO M: ALMACÉN DE SUSTANCIAS PELIGROSAS CASETA I 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1722 17.01 S3 M DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1723 21.01.03 S3 M CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1724 19.02.02.01 S3 M LOSA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1725 19.02.02.01.01 S3 M COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 03/12/2021 04/12/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1726 19.02.02.01.02 S3 M ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 0.00 01/12/2021 02/12/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1727 19.02.02.01.03 S3 M SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 29/11/2021 30/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1728 19.02.02.02 S3 M CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1729 19.02.02.02.01 S3 M CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.00 07/12/2021 09/12/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1730 17.01.02 S3 M APLICACIÓN DE GROUT E IMPERMEABILIZANTE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1731 17.01.02.01 S3 M GROUT PARA PEDESTAL E=2.5CM m2 0.00% 1.00 12/01/2022 18/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.2857 3.12568908 0.28 0.1429 0.1429 0.1429 0.1429 0.1429 0 0 0.71 7.814223 0.71 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1732 17.01.03 S3 M ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1733 17.01.03.01 S3 M DESMONTAJE DE ESTRUCTURAS METALICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1734 17.01.03.01.01 S3 M DESMONTAJE COBERTURA DE CALAMINA GALVANIZADA kg 100.00% 0.00 10/12/2021 29/12/2021 20.00 20.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1735 17.01.03.01.02 S3 M DESMONTAJE DE PANELES DE MALLA GALVANIZADA REUTILIZABLES kg 100.00% 0.00 10/12/2021 29/12/2021 20.00 20.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1736 17.01.03.01.03 S3 M DESMONTAJE DE CORREAS REUTILIZABLES kg 100.00% 0.00 10/12/2021 29/12/2021 20.00 20.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1737 17.01.03.01.04 S3 M DESMONTAJE DE COLUMNAS REUTILIZABLES kg 100.00% 0.00 10/12/2021 29/12/2021 20.00 20.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1738 17.01.03.01 S3 M MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1739 17.01.03.01.01 S3 M INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS REUTILI kg 0.00% 164.00 05/01/2022 11/01/2022 7.00 7.00 23.43 164.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23.429 23.429 46.9 7.6955162 0.29 23.429 23.429 23.429 23.429 23.429 0 0 117.14 19.2387904 0.71 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1740 17.01.03.01.02 S3 M INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS REUTILIZA kg 0.00% 160.00 05/01/2022 11/01/2022 7.00 7.00 22.86 160.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22.857 22.857 45.7 3.5045023 0.29 22.857 22.857 22.857 22.857 22.857 0 0 114.29 8.76125578 0.73 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1741 17.01.03.01.03 S3 M INSTALACIÓN CERRAMIENTO MALLA GALVANIZADA REUTILIZABLES kg 0.00% 93.00 05/01/2022 11/01/2022 7.00 7.00 13.29 93.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13.286 13.286 26.6 1.2226117 0.31 13.286 13.286 13.286 13.286 13.286 0 0 66.429 3.05652936 0.76 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1742 17.01.03.01.04 S3 M INSTALACIÓN E IZAJE DE COBERTURA DE CALAMINA GALVANIZADA R m2 0.00% 11.00 05/01/2022 11/01/2022 7.00 7.00 1.57 11.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 1.5714 1.5714 3.14 0.0904275 ### 1.5714 1.5714 1.5714 1.5714 1.5714 0 0 7.8571 0.22606869 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1743 17.01.03.01 S3 M INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1744 17.01.03.01.01 S3 M INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y A kg 0.00% 21.00 30/12/2021 05/01/2022 7.00 7.00 3.00 21.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 3 3 0.4927007 0.16 3 3 3 3 3 3 0 18 2.9562044 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1745 17.01.03.01 S3 M LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1746 17.01.03.01.01 S3 M LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 57.14% 35.14 30/12/2021 05/01/2022 7.00 7.00 5.02 35.14 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 5.02 5.02 0.8244526 0.06 5.02 5.02 5.02 5.02 5.02 5.02 0 30.1 4.9467153 0.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1747 17.01.03.01 S3 M PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1748 17.01.03.01.01 S3 M PINTURA DE ELEMENTOS METALICOS m2 57.14% 35.14 30/12/2021 05/01/2022 7.00 7.00 5.02 35.14 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 5.02 5.02 0.8244526 0.06 5.02 5.02 5.02 5.02 5.02 5.02 0 30.1 4.9467153 0.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1749 17.01.03.01 S3 M TRANSPORTE DE ELEMENTOS ESTRUCTURALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1750 17.01.03.01.01 S3 M TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 0.00% 465.00 30/12/2021 12/01/2022 14.00 14.00 33.21 465.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 33.214 33.2 5.4549009 0.07 33.214 33.214 33.214 33.214 33.214 33.214 33.214 233 38.184307 0.5 33.214 33.214 33.214 33.214 33.214 33.214 0 199.29 32.7294056 0.43 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1751 18 S3 N MÓDULO N: ALMACÉN DE SUSTANCIAS PELIGROSAS CASETA II 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1752 18.01 S3 N DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1753 24.01.02 S3 N CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1754 18.01.01.01 S3 N LOSA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1755 18.01.01.01.01 S3 N COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 30/12/2021 30/12/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1756 18.01.01.01.02 S3 N ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 0.00 24/12/2021 26/12/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1757 18.01.01.01.03 S3 N SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 27/12/2021 29/12/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1758 18.01.01.02 S3 N SARDINEL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1759 18.01.01.02.01 S3 N COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 1.00 28/12/2021 28/12/2021 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 1 0 0 1 5.8333 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1760 18.01.01.02.02 S3 N ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 0.00% 5.00 24/12/2021 26/12/2021 3.00 3.00 1.67 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 1.6667 1.6667 1.6667 0 0 0 0 5 12.352941 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1761 18.01.01.02.03 S3 N SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 0.00% 30.00 25/12/2021 27/12/2021 3.00 3.00 10.00 30.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 10 10 10 0 0 0 30 3.5 0.88 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1762 18.01.01.03 S3 N CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1763 18.01.01.03.01 S3 N CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.00 Err:507 Err:507 3.00Err:507 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1764 18.01.02 S3 N APLICACIÓN DE GROUT E IMPERMEABILIZANTE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1765 18.01.02.01 S3 N GROUT PARA PEDESTAL E=2.5CM m2 0.00% 1.00 04/01/2022 08/01/2022 5.00 5.00 0.20 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2 0.2 0.2 0.6 6.5639471 0.6 0.2 0.2 0 0 0 0 0 0.4 4.37596472 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1766 18.01.03 S3 N ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1767 18.01.03.01 S3 N DESMONTAJE DE ESTRUCTURAS METALICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1768 18.01.03.01.01 S3 N DESMONTAJE DE CORREAS REUTILIZABLES kg 100.00% 0.00 10/12/2021 29/12/2021 20.00 20.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1769 18.01.03.01.02 S3 N DESMONTAJE DE TIJERALES REUTILIZABLES kg 100.00% 0.00 10/12/2021 29/12/2021 20.00 20.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1770 18.01.03.01.03 S3 N DESMONTAJE DE COLUMNAS REUTILIZABLES kg 100.00% 0.00 10/12/2021 29/12/2021 20.00 20.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1771 18.01.03.02 S3 N MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1772 18.01.03.02.01 S3 N INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS REUTILI kg 0.00% 230.00 30/12/2021 03/01/2022 5.00 5.00 46.00 230.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 46 46 2.6470588 0.2 46 46 46 46 0 0 0 184 10.588235 0.81 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1773 18.01.03.02.02 S3 N INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS REUTILIZA kg 0.00% 50.00 30/12/2021 03/01/2022 5.00 5.00 10.00 50.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 10 10 0.9594883 0.19 10 10 10 10 0 0 0 40 3.8379531 0.77 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1774 18.01.03.02.03 S3 N INSTALACIÓN CERRAMIENTO MALLA GALVANIZADA REUTILIZABLES kg 0.00% 76.00 30/12/2021 03/01/2022 5.00 5.00 15.20 76.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 15.2 15.2 2.9106383 0.19 15.2 15.2 15.2 15.2 0 0 0 60.8 11.642553 0.78 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1775 18.01.03.03 S3 N MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1776 18.01.03.03.01 S3 N SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1777 18.01.03.03.01.01 S3 N ACERO ESTRUCTURAL PLANCHA 1/2" kg 31.50% 13.70 30/12/2021 03/01/2022 5.00 5.00 2.74 13.70 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 2.74 2.74 0.175142 0.18 2.74 2.74 2.74 2.74 0 0 0 11 0.7005682 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1778 18.01.03.03.02 S3 N SUMINISTRO, INSTALACIÓN DE PANELES DE MALLA GALVANIZADA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1779 18.01.03.03.02.01 S3 N ACERO ESTRUCTURAL ANGULO 1"x1"x1/8" kg 48.61% 47.80 30/12/2021 03/01/2022 5.00 5.00 9.56 47.80 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 9.56 9.56 1.1002558 0.1 9.56 9.56 9.56 9.56 0 0 0 38.2 4.401023 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1780 18.01.03.03.02.02 S3 N MALLA GALVANIZADA #8 - 2"x2" kg 49.63% 73.04 30/12/2021 03/01/2022 5.00 5.00 14.61 73.04 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 14.608 14.6 3.4188936 0.1 14.608 14.608 14.608 14.608 0 0 0 58.4 13.675574 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1781 18.01.03.03.03 S3 N SUMINISTRO, INSTALACIÓN DE COBERTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1782 20.02.04.03.03.01.01 S3 N SUMINISTRO, INSTALACIÓN COBERTURA TR-4 m2 60.00% 7.20 30/12/2021 03/01/2022 5.00 5.00 1.44 7.20 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 1.44 1.44 0.624 0.08 1.44 1.44 1.44 1.44 0 0 0 5.76 2.496 0.31 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1783 18.01.03.04 S3 N INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1784 18.01.03.04.01 S3 N INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y A kg 0.00% 31.00 30/12/2021 03/01/2022 5.00 5.00 6.20 31.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 6.2 6.2 0.5492126 0.18 6.2 6.2 6.2 6.2 0 0 0 24.8 2.1968504 0.73 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1785 18.01.03.05 S3 N LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1786 20.02.04.05.01.01 S3 N LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 0.00% 16.00 17/12/2021 21/12/2021 5.00 5.00 3.20 16.00 X X 3.2 3.2 3.2 3.2 3.2 0 0 16 8.00 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1787 18.01.03.06 S3 N PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1788 18.01.03.06.01 S3 N PINTURA DE ELEMENTOS METALICOS m2 0.00% 87.00 17/12/2021 21/12/2021 5.00 5.00 17.40 87.00 X X 17.4 17.4 17.4 17.4 17.4 0 0 87 38.06 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1789 18.01.03.07 S3 N TRANSPORTE DE ELEMENTOS ESTRUCTURALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1790 18.01.03.07.01 S3 N TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 61.60% 135.94 17/12/2021 27/12/2021 11.00 11.00 12.36 135.94 X X 12.358 12.358 12.358 12.358 12.358 12.358 12.358 86.5 1.42 0.24 12.358 12.358 12.358 12.358 0 0 0 49.4 0.8127952 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1791 19 S3 O Y P MÓDULO O Y P: TALLER MECÁNICO Y DE PINTURA SOCIOS ESTRATÉGICOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1792 19.01 S3 O Y P DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1793 19.01.01 S3 O Y P MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1794 19.01.01.01 S3 O Y P EXCAVACION P/ZAPATAS m3 100.00% 0.00 13.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1795 19.01.01.02 S3 O Y P EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 0.00 13.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1796 19.01.01.03 S3 O Y P REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.00 7.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1797 19.01.01.04 S3 O Y P TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.00 7.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1798 19.01.01.05 S3 O Y P TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 100.00% 0.00 7.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1799 19.01.01.06 S3 O Y P RELLENO ESTRUCTURAL CON MATERIAL PROPIO SELECCIONADO m3 100.00% 0.00 7.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1800 19.01.01.07 S3 O Y P MEJORAMIENTO CON MATERIAL GRANULAR m3 100.00% 0.00 7.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1801 19.01.01.08 S3 O Y P ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.00 7.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1802 19.01.01.09 S3 O Y P ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.00 7.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1803 19.01.01.10 S3 O Y P APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.00 7.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1804 25.01.02 S3 O Y P CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1805 19.01.02.01 S3 O Y P CONCRETO SIMPLE PARA ZAPATAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1806 19.01.02.01.01 S3 O Y P COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1807 03.01.02 S3 O Y P 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1808 19.01.03.01 S3 O Y P ZAPATAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1809 19.01.03.01.01 S3 O Y P COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1810 19.01.03.01.02 S3 O Y P SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1811 19.01.03.02 S3 O Y P PEDESTAL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1812 19.01.03.02.01 S3 O Y P COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1813 19.01.03.02.02 S3 O Y P ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1814 19.01.03.02.03 S3 O Y P SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1815 19.01.03.03 S3 O Y P LOSA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1816 19.01.03.03.01 S3 O Y P COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 27.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1817 19.01.03.03.02 S3 O Y P ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 0.00 27.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1818 19.01.03.03.03 S3 O Y P SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 27.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1819 19.01.03.04 S3 O Y P VEREDA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1820 19.01.03.04.01 S3 O Y P COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 19/11/2021 19/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1821 19.01.03.04.02 S3 O Y P ENCOFRADO CARAVISTA Y DESENCOFRADO DE VEREDA m2 100.00% 0.00 26/10/2021 27/10/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1822 19.01.03.04.03 S3 O Y P SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 29/10/2021 29/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1823 19.01.03.05 S3 O Y P RAMPA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1824 19.01.03.05.01 S3 O Y P COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 27/11/2021 27/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1825 19.01.03.05.02 S3 O Y P ENCOFRADO CARAVISTA Y DESENCOFRADO DE RAMPA m2 100.00% 0.00 23/11/2021 24/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1826 19.01.03.05.03 S3 O Y P SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 25/11/2021 26/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1827 19.01.03.06 S3 O Y P CANAL DE DRENAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1828 19.01.03.06.01 S3 O Y P COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 27/11/2021 27/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1829 19.01.03.06.02 S3 O Y P ENCOFRADO CARAVISTA Y DESENCOFRADO DE CANAL DE DRENAJE m2 100.00% 0.00 23/11/2021 24/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1830 19.01.03.06.03 S3 O Y P SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 25/11/2021 26/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1831 19.01.03.07 S3 O Y P SARDINEL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1832 19.01.03.07.01 S3 O Y P COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1833 19.01.03.07.02 S3 O Y P ENCOFRADO CARAVISTA Y DESENCOFRADO DE SARDINEL m2 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1834 19.01.03.07.03 S3 O Y P SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1835 19.01.03.08 S3 O Y P CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1836 19.01.03.08.01 S3 O Y P CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.00 01/12/2021 03/12/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1837 19.01.03.09 S3 O Y P SELLADO DE JUNTAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1838 19.01.03.09.01 S3 O Y P SELLADO DE JUNTA TIPO 1 m 100.00% 0.00 04/12/2021 05/12/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1839 19.01.03.09.02 S3 O Y P SELLADO DE JUNTA TIPO 2 m 100.00% 0.00 04/12/2021 05/12/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1840 19.01.03.09.03 S3 O Y P SELLADO DE JUNTA TIPO 3 m 100.00% 0.00 04/12/2021 05/12/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1841 19.01.03.09.04 S3 O Y P JUNTA TIPICA EN PEDESTAL m 100.00% 0.00 04/12/2021 05/12/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1842 19.01.04 S3 O Y P BRUÑAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1843 19.01.04.01 S3 O Y P BRUÑADO EN RAMPA m2 100.00% 0.00 27/11/2021 27/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1844 19.01.05 S3 O Y P APLICACIÓN DE GROUT E IMPERMEABILIZANTE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1845 19.01.05.01 S3 O Y P GROUT PARA PEDESTAL E=2.5CM m2 0.00% 4.00 07/01/2022 07/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 4 43.7596472 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1846 19.01.06 S3 O Y P CARPINTERIA METALICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1847 19.01.06.01 S3 O Y P SUMINISTRO E INSTALACIÓN DE PUERTA CORREDIZA P07 INC. RIEL S und 60.00% 0.80 13/01/2022 22/01/2022 10.00 10.00 0.08 0.80 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.08 0.08 3.36 0.04 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.56 23.52 0.28 0.08 0.08 0 0 0 0 0 0.16 6.72 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1848 19.01.06.02 S3 O Y P SUMINISTRO E INSTALACIÓN DE GRATING TMyP 1 1/4"x1/4"x0.25m m 100.00% 0.00 13/01/2022 22/01/2022 10.00 10.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1849 19.01.07 S3 O Y P ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1850 19.01.07.01 S3 O Y P MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1851 19.01.07.01.01 S3 O Y P INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS REUTILI kg 0.00% 1,586.00 28/12/2021 06/01/2022 10.00 10.00 158.60 1586.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 158.6 158.6 158.6 476 27.379795 0.3 158.6 158.6 158.6 158.6 158.6 158.6 158.6 1110 63.886189 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1852 19.01.07.01.02 S3 O Y P INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES REUTILIZ kg 0.00% 1,428.00 28/12/2021 06/01/2022 10.00 10.00 142.80 1428.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 142.8 142.8 142.8 428 32.841567 0.3 142.8 142.8 142.8 142.8 142.8 142.8 142.8 1000 76.630324 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1853 19.01.07.01.03 S3 O Y P INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTR kg 0.00% 243.00 28/12/2021 06/01/2022 10.00 10.00 24.30 243.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 24.3 24.3 24.3 72.9 4.1950128 0.3 24.3 24.3 24.3 24.3 24.3 24.3 24.3 170 9.7883632 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1854 19.01.07.01.04 S3 O Y P INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES REUT kg 0.00% 344.00 28/12/2021 06/01/2022 10.00 10.00 34.40 344.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 34.4 34.4 34.4 103 11.877238 0.3 34.4 34.4 34.4 34.4 34.4 34.4 34.4 241 27.713555 0.69 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1855 19.01.07.02 S3 O Y P MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1856 19.01.07.02.01 S3 O Y P SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1857 19.01.07.02.01.01 S3 O Y P ACERO ESTRUCTURAL TUBO 8"x8"x6mm kg 0.00% 1,378.00 28/12/2021 06/01/2022 10.00 10.00 137.80 1378.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 137.8 137.8 137.8 413 19.582105 0.3 137.8 137.8 137.8 137.8 137.8 137.8 137.8 965 45.691579 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1858 19.01.07.02.01.02 S3 O Y P ACERO ESTRUCTURAL PLANCHA 3/4" kg 4.27% 246.04 28/12/2021 06/01/2022 10.00 10.00 24.60 246.04 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 24.604 24.604 24.604 73.8 4.2474936 0.28 24.604 24.604 24.604 24.604 24.604 24.604 24.604 172 9.9108184 0.66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1859 19.01.07.02.01.03 S3 O Y P ACERO ESTRUCTURAL PLANCHA 1/2" kg 5.84% 193.02 28/12/2021 06/01/2022 10.00 10.00 19.30 193.02 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 19.302 19.302 19.302 57.9 3.7013778 0.28 19.302 19.302 19.302 19.302 19.302 19.302 19.302 135 8.6365483 0.66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1860 19.01.07.02.02 S3 O Y P SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1861 19.01.07.02.02.01 S3 O Y P ACERO ESTRUCTURAL ANGULO 2 1/2"x2 1/2"x3/8" kg 60.00% 920.80 28/12/2021 06/01/2022 10.00 10.00 92.08 920.80 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 92.08 92.08 92.08 276 31.792327 0.12 92.08 92.08 92.08 92.08 92.08 92.08 92.08 645 74.182097 0.28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1862 19.01.07.02.02.02 S3 O Y P ACERO ESTRUCTURAL ANGULO 1"x1"x1/8" kg 60.00% 8.40 28/12/2021 06/01/2022 10.00 10.00 0.84 8.40 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0.84 0.84 0.84 2.52 0.2900256 0.15 0.84 0.84 0.84 0.84 0.84 0.84 0.84 5.88 0.6767263 0.34 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1863 19.01.07.02.02.03 S3 O Y P ACERO ESTRUCTURAL PLANCHA 3/8" kg 3.21% 309.73 28/12/2021 06/01/2022 10.00 10.00 30.97 309.73 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 30.973 30.973 30.973 92.9 5.9394247 0.3 30.973 30.973 30.973 30.973 30.973 30.973 30.973 217 13.858658 0.69 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1864 19.01.07.02.03 S3 O Y P SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1865 19.01.07.02.03.01 S3 O Y P ACERO ESTRUCTURAL TUBO 3"x3"x4.5mm kg 0.00% 122.00 28/12/2021 06/01/2022 10.00 10.00 12.20 122.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 12.2 12.2 12.2 36.6 4.2122762 0.3 12.2 12.2 12.2 12.2 12.2 12.2 12.2 85.4 9.8286445 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1866 19.01.07.02.03.02 S3 O Y P ACERO ESTRUCTURAL PLANCHA 1/2" kg 0.00% 111.00 28/12/2021 06/01/2022 10.00 10.00 11.10 111.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 11.1 11.1 11.1 33.3 2.1285511 0.3 11.1 11.1 11.1 11.1 11.1 11.1 11.1 77.7 4.9666193 0.71 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1867 19.01.07.02.04 S3 O Y P SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1868 19.01.07.02.04.01 S3 O Y P ACERO ESTRUCTURAL PERFIL C 6"x2"x1/8" kg 67.69% 1,525.92 28/12/2021 06/01/2022 10.00 10.00 152.59 1525.92 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 152.59 152.59 152.59 458 40.551024 0.1 152.59 152.59 152.59 152.59 152.59 152.59 152.59 1068 94.619055 0.23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1869 19.01.07.02.04.02 S3 O Y P ACERO ESTRUCTURAL ANGULO L - 3"x1/4" kg 0.00% 248.00 28/12/2021 06/01/2022 10.00 10.00 24.80 248.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 24.8 24.8 24.8 74.4 6.3409091 0.3 24.8 24.8 24.8 24.8 24.8 24.8 24.8 174 14.795455 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1870 19.01.07.02.05 S3 O Y P SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL DIAGONALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1871 19.01.07.02.05.01 S3 O Y P ACERO ESTRUCTURAL ANGULO L-2 1/2"x3/16" kg 0.00% 1,351.00 28/12/2021 06/01/2022 10.00 10.00 135.10 1351.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 135.1 135.1 135.1 405 46.64578 0.3 135.1 135.1 135.1 135.1 135.1 135.1 135.1 946 108.84015 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1872 19.01.07.02.05.02 S3 O Y P ACERO ESTRUCTURAL PLANCHA 3/8" kg 0.00% 145.00 28/12/2021 06/01/2022 10.00 10.00 14.50 145.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 14.5 14.5 14.5 43.5 2.7805398 0.31 14.5 14.5 14.5 14.5 14.5 14.5 14.5 102 6.4879261 0.72 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1873 19.01.07.02.06 S3 O Y P SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VENTANAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1874 19.01.07.02.06.01 S3 O Y P ACERO ESTRUCTURAL ANGULO 2"x2"x1/8" kg 0.00% 20.00 28/12/2021 06/01/2022 10.00 10.00 2.00 20.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 2 2 2 6 0.6905371 0.35 2 2 2 2 2 2 2 14 1.6112532 0.81 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1875 19.01.07.02.06.02 S3 O Y P ACERO ESTRUCTURAL PLANCHA 3/8" kg 0.00% 18.00 28/12/2021 06/01/2022 10.00 10.00 1.80 18.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 1.8 1.8 1.8 5.4 0.3451705 0.35 1.8 1.8 1.8 1.8 1.8 1.8 1.8 12.6 0.8053977 0.81 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1876 19.01.07.02.06.03 S3 O Y P ACERO ESTRUCTURAL ANGULO 1 1/2"x1 1/2"x1/8" kg 0.00% 8.00 28/12/2021 06/01/2022 10.00 10.00 0.80 8.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0.8 0.8 0.8 2.4 0.2762148 0.28 0.8 0.8 0.8 0.8 0.8 0.8 0.8 5.6 0.6445013 0.64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1877 19.01.07.02.07 S3 O Y P SUMINISTRO, INSTALACIÓN DE COBERTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1878 19.01.07.02.07.01 S3 O Y P SUMINISTRO, INSTALACIÓN COBERTURA TR-4 m2 59.66% 113.77 28/12/2021 06/01/2022 10.00 10.00 11.38 113.77 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 11.377 11.377 11.377 34.1 14.7901 0.12 11.377 11.377 11.377 11.377 11.377 11.377 11.377 79.6 34.510233 0.28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1879 19.01.07.02.07.02 S3 O Y P SUMINISTRO, INSTALACIÓN COBERTURA TR-4 TRANSLUCIDO m2 73.65% 2.63 28/12/2021 06/01/2022 10.00 10.00 0.26 2.63 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0.263 0.263 0.263 0.79 0.3419 0.09 0.263 0.263 0.263 0.263 0.263 0.263 0.263 1.84 0.7977667 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1880 19.01.07.02.08 S3 O Y P SUMINISTRO, INSTALACIÓN DE CERRAMIENTO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1881 19.01.07.02.08.01 S3 O Y P SUMINISTRO, INSTALACIÓN CERRAMIENTO TR-4 m2 59.44% 203.19 28/12/2021 06/01/2022 10.00 10.00 20.32 203.19 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 20.319 20.319 20.319 61 26.4147 0.12 20.319 20.319 20.319 20.319 20.319 20.319 20.319 142 61.6343 0.28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1882 19.01.07.02.09 S3 O Y P SUMINISTRO, INSTALACIÓN DE CUMBRERA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1883 19.01.07.02.09.01 S3 O Y P SUMINISTRO, INSTALACIÓN DE CUMBRERA TR-4 m 57.65% 5.51 28/12/2021 06/01/2022 10.00 10.00 0.55 5.51 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0.551 0.551 0.551 1.65 0.2784 0.14 0.551 0.551 0.551 0.551 0.551 0.551 0.551 3.86 0.6496 0.32 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1884 19.01.07.02.10 S3 O Y P SUMINISTRO, INSTALACIÓN DE ESQUINEROS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1885 19.01.07.02.10.01 S3 O Y P SUMINISTRO, INSTALACIÓN ESQUINEROS TR-4 m 57.65% 9.74 28/12/2021 06/01/2022 10.00 10.00 0.97 9.74 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0.974 0.974 0.974 2.92 0.4921263 0.12 0.974 0.974 0.974 0.974 0.974 0.974 0.974 6.82 1.1482947 0.29 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1886 19.01.07.02.11 S3 O Y P SUMINISTRO, INSTALACIÓN REMATES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1887 19.01.07.02.11.01 S3 O Y P SUMINISTRO, INSTALACIÓN REMATES TR-4 m 65.28% 26.04 28/12/2021 06/01/2022 10.00 10.00 2.60 26.04 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 2.604 2.604 2.604 7.81 1.3157053 0.1 2.604 2.604 2.604 2.604 2.604 2.604 2.604 18.2 3.0699789 0.24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1888 19.01.07.02.12 S3 O Y P INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1889 19.01.07.02.12.01 S3 O Y P ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=3/4" kg 60.00% 29.60 28/12/2021 06/01/2022 10.00 10.00 2.96 29.60 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 2.96 2.96 2.96 8.88 1.554 0.12 2.96 2.96 2.96 2.96 2.96 2.96 2.96 20.7 3.626 0.28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1890 19.01.07.03 S3 O Y P INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1891 19.01.07.03.01 S3 O Y P INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y A kg 0.00% 745.00 28/12/2021 06/01/2022 10.00 10.00 74.50 745.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 74.5 74.5 74.5 224 19.798228 0.3 74.5 74.5 74.5 74.5 74.5 74.5 74.5 522 46.195866 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1892 19.01.07.04 S3 O Y P LIJADO DE ELEMENTOS METÁLICOS REUTILIZABLES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1893 19.01.07.04.01 S3 O Y P LIJADO DE ELEMENTOS METALICOS REUTILIZABLES m2 91.00% 14.94 17/12/2021 27/12/2021 11.00 11.00 1.36 14.94 X X 1.3582 1.3582 1.3582 1.3582 1.3582 1.3582 1.3582 9.51 4.75 0.06 1.3582 1.3582 1.3582 1.3582 0 0 0 5.43 2.7163636 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1894 19.01.07.05 S3 O Y P PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1895 19.01.07.05.01 S3 O Y P PINTURA DE ELEMENTOS METALICOS m2 91.00% 70.83 17/12/2021 27/12/2021 11.00 11.00 6.44 70.83 X X 6.4391 6.4391 6.4391 6.4391 6.4391 6.4391 6.4391 45.1 19.72 0.06 6.4391 6.4391 6.4391 6.4391 0 0 0 25.8 11.268409 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1896 19.01.07.06 S3 O Y P TRANSPORTE DE ELEMENTOS ESTRUCTURALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1897 19.01.07.06.01 S3 O Y P TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 75.00% 899.75 17/12/2021 27/12/2021 11.00 11.00 81.80 899.75 X X 81.795 81.795 81.795 81.795 81.795 81.795 81.795 573 9.41 0.16 81.795 81.795 81.795 81.795 0 0 0 327 5.3796712 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1898 19.02 S3 O Y P DISCIPLINA: INSTALACIONES SANITARIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1899 19.02.01 S3 O Y P TUBERIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1900 19.02.01.01 S3 O Y P MONTANTE DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1901 19.02.01.01.01 S3 O Y P 975-SD-4"-P0E03U-100022 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1902 19.02.01.01.01.01 S3 O Y P Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 9.00 07/01/2022 11/01/2022 5.00 5.00 1.80 9.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.8 1.8 1.8 1.8 1.8 0 0 9 8.90625 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1903 19.02.01.01.01.02 S3 O Y P El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 07/01/2022 11/01/2022 5.00 5.00 0.20 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0.2 0.2 0.2 0.2 0.2 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1904 19.02.01.01.02 S3 O Y P 975-SD-4"-P0E03U-100023 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1905 19.02.01.01.02.01 S3 O Y P Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 13.00 07/01/2022 11/01/2022 5.00 5.00 2.60 13.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.6 2.6 2.6 2.6 2.6 0 0 13 8.90625 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1906 19.02.01.01.02.02 S3 O Y P El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 07/01/2022 11/01/2022 5.00 5.00 0.20 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0.2 0.2 0.2 0.2 0.2 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1907 19.02.02 S3 O Y P MECÁNICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1908 19.02.02.01 S3 O Y P CANALETAS DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1909 19.02.02.01.01 S3 O Y P ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 65.26% 7.99 07/01/2022 11/01/2022 5.00 5.00 1.60 7.99 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.598 1.598 1.598 1.598 1.598 0 0 7.99 3.25679348 0.36 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1910 19.02.02.01.02 S3 O Y P ACERO ESTRUCTURAL PLANCHA DE F°G° 0.8MM kg 65.28% 61.45 07/01/2022 11/01/2022 5.00 5.00 12.29 61.45 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12.29 12.29 12.29 12.29 12.29 0 0 61.45 22.7833686 0.35 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1911 19.02.02.02 S3 O Y P SOPORTERIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1912 19.02.02.02.01 S3 O Y P GS1-4", Tubería 975-SD-4"-P0E03U-100022 & 100023 pza 0.00% 6.00 07/01/2022 11/01/2022 5.00 5.00 1.20 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.2 1.2 1.2 1.2 1.2 0 0 6 18 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1913 19.03 S3 O Y P DISCIPLINA: INSTALACIONES ELÉCTRICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1914 19.03.01 S3 O Y P SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1915 19.03.01.01 S3 O Y P ARTEFACTO DE ALUMBRADO LITHONIA LIGHTING FEM L48 8000LM LPPF pto 0.00% 8.00 07/01/2022 11/01/2022 5.00 5.00 1.60 8.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.6 1.6 1.6 1.6 1.6 0 0 8 58.24 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1916 19.03.01.02 S3 O Y P SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE P pto 0.00% 7.00 07/01/2022 11/01/2022 5.00 5.00 1.40 7.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.4 1.4 1.4 1.4 1.4 0 0 7 42.4662 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1917 19.03.01.03 S3 O Y P SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE pto 0.00% 4.00 07/01/2022 11/01/2022 5.00 5.00 0.80 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.8 0.8 0.8 0.8 0.8 0 0 4 24.2664 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1918 19.03.01.04 S3 O Y P SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON 1286W pto 0.00% 3.00 07/01/2022 11/01/2022 5.00 5.00 0.60 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.6 0.6 0.6 0.6 0.6 0 0 3 5.28 1.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1919 19.03.01.05 S3 O Y P SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON 5462- pto 0.00% 4.00 07/01/2022 11/01/2022 5.00 5.00 0.80 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.8 0.8 0.8 0.8 0.8 0 0 4 17.6 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1920 19.03.01.06 S3 O Y P SUMINISTRO Y MONTAJE DE TOMACORRIENTE INDUSTRIAL MONOFÁSI pto 0.00% 2.00 07/01/2022 11/01/2022 5.00 5.00 0.40 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4 0.4 0.4 0.4 0.4 0 0 2 11.2 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1921 19.03.02 S3 O Y P TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1922 19.03.02.01 S3 O Y P SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1139 UND 0.00% 1.00 07/01/2022 11/01/2022 5.00 5.00 0.20 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2 0.2 0.2 0.2 0.2 0 0 1 90.009 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1923 19.03.02.02 S3 O Y P SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE 230
UND 0.00% 2.00 07/01/2022 11/01/2022 5.00 5.00 0.40 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4 0.4 0.4 0.4 0.4 0 0 2 2.7534 0.92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1924 19.03.03 S3 O Y P CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1925 19.03.03.01 S3 O Y P SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 298.00 12/01/2022 16/01/2022 5.00 5.00 59.60 298.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 59.6 59.6 119.2 107.62568 0.4 59.6 59.6 59.6 0 0 0 0 179 161.4385 0.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1926 19.03.03.02 S3 O Y P SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 1.00 12/01/2022 16/01/2022 5.00 5.00 0.20 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2 0.2 0.4 0.36116 0.36 0.2 0.2 0.2 0 0 0 0 0.6 0.54174 0.54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1927 19.03.04 S3 O Y P CONDUCTORES Y CABLES DE ENERGIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1928 19.03.04.01 S3 O Y P SUMINISTRO E INSTALACIÓN DE CABLE 2-1/c #12 AWG + GRD; XHHW-2, 0 M 0.00% 190.00 12/01/2022 16/01/2022 5.00 5.00 38.00 190.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 38 38 76 21.9336 0.4 38 38 38 0 0 0 0 114 32.9004 0.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1929 19.03.04.02 S3 O Y P SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW M 0.00% 184.00 12/01/2022 16/01/2022 5.00 5.00 36.80 184.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 36.8 36.8 73.6 21.24096 0.4 36.8 36.8 36.8 0 0 0 0 110 31.86144 0.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1930 19.03.05 S3 O Y P EQUIPOS ELÉCTRICOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1931 19.03.05.01 S3 O Y P INSTALACIÓN DE EQUIPO 1 DESENLLANTADORA 1.32 KW 220 V MONO und 0.00% 1.00 12/01/2022 15/01/2022 4.00 4.00 0.25 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.25 0.25 0.5 31 0.5 0.25 0.25 0 0 0 0 0 0.5 31 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1932 19.03.05.02 S3 O Y P INSTALACIÓN DE EQUIPO 1 COMPRESORA 01 1.32 KW 220 V MONOFÁS und 0.00% 2.00 12/01/2022 15/01/2022 4.00 4.00 0.50 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5 0.5 1 62 0.5 0.5 0.5 0 0 0 0 0 1 62 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1933 20 S3 R MÓDULO R: SERVICIOS HIGIÉNICOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1934 20.01 S3 R DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1935 20.01.01 S3 R MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1936 20.01.01.01 S3 R EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1937 20.01.01.02 S3 R REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1938 20.01.01.03 S3 R ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1939 20.01.01.04 S3 R ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1940 20.01.01.05 S3 R APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1941 05.01.02 S3 R CONCRETO SIMPLE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1942 20.01.02.01 S3 R CONCRETO SIMPLE PARA DADOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1943 20.01.02.01.01 S3 R COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 0.00 5.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1944 20.01.02.01.02 S3 R ENCOFRADO CARAVISTA Y DESENCOFRADO DE DADO DE CONCRETO m2 100.00% 0.00 5.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1945 20.01.02.01.03 S3 R COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 5.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1946 20.01.02.02 S3 R CONCRETO SIMPLE PARA PELDAÑOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1947 20.01.02.02.01 S3 R ENCOFRADO CARAVISTA Y DESENCOFRADO DE PELDAÑOS m2 0.00% 2.00 15/01/2022 15/01/2022 1.00 1.00 2.00 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 2 4.941176 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1948 20.01.02.02.02 S3 R COLOCACIÓN DE CONCRETO F'c=20 MPa m3 0.00% 1.00 16/01/2022 16/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 6.1765 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1949 20.01.02.03 S3 R CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1950 20.01.02.03.01 S3 R CURADO DE CONCRETO CON ANTISOL m2 80.00% 1.40 20/01/2022 22/01/2022 3.00 3.00 0.47 1.40 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4667 0.47 0.064167 0.06 0.4667 0.4667 0 0 0 0 0 0.93 0.128333 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1951 20.01.03 S3 R ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1952 20.01.03.01 S3 R DESMONTAJE DE ESTRUCTURAS METALICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1953 20.01.03.01.01 S3 R DESMONTAJE DE CONTAINER REUTILIZABLES kg 0.00% 3,375.00 25/01/2022 25/01/2022 1.00 1.00 3,375.00 3375.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3375 0 0 3375 97.10678 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1954 20.01.03.02 S3 R MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS EXISTENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1955 20.01.03.02.01 S3 R INSTALACIÓN E IZAJE DE CONTAINER REUTILIZABLE kg 0.00% 3,375.00 02/02/2022 02/02/2022 1.00 1.00 3,375.00 3375.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3375 0 3375 185.625 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1956 20.01.03.03 S3 R PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1957 20.01.03.03.01 S3 R PINTURA DE ELEMENTOS METALICOS m2 0.00% 143.00 26/01/2022 01/02/2022 7.00 7.00 20.43 143.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20.429 20.429 40.9 17.875 0.28 20.429 20.429 20.429 20.429 20.429 0 0 102 44.6875 0.71 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1958 20.01.03.04 S3 R TRANSPORTE DE ELEMENTOS ESTRUCTURALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1959 20.01.03.04.01 S3 R TRANSPORTE DE ELEMENTOS ESTRUCTURALES DESMONTADOS kg 0.00% 3,375.00 26/01/2022 01/02/2022 7.00 7.00 482.14 3375.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 482.14 482.14 964 15.85522 0.29 482.14 482.14 482.14 482.14 482.14 0 0 2411 39.638053 0.72 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1960 20.02 S3 R DISCIPLINA: INSTALACIONES ELÉCTRICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1961 20.02.01 S3 R SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1962 20.02.01.01 S3 R SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE pto 0.00% 2.00 03/02/2022 07/02/2022 5.00 5.00 0.40 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4 0.4 1.17332 0.2 0.4 0.4 0.4 0.4 0 0 0 1.6 4.69328 0.78 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1963 20.02.02 S3 R TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1964 20.02.02.01 S3 R DESMONTAJE Y MONTAJE DE TABLERO ELÉCTRICO 975-LPA-1202 und 0.00% 1.00 03/02/2022 07/02/2022 5.00 5.00 0.20 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2 0.2 14.72 0.2 0.2 0.2 0.2 0.2 0 0 0 0.8 58.88 0.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1965 20.02.03 S3 R CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1966 20.02.03.01 S3 R SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 15.00 03/02/2022 09/02/2022 7.00 7.00 2.14 15.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.1429 2.14 1.9347857 0.14 2.1429 2.1429 2.1429 2.1429 2.1429 2.1429 0 12.911.60871 0.83 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1967 20.02.04 S3 R CONDUCTORES Y CABLES DE ENERGIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1968 20.02.04.01 S3 R SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW M 0.00% 19.00 03/02/2022 09/02/2022 7.00 7.00 2.71 19.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.7143 2.71 0.7833429 0.16 2.7143 2.7143 2.7143 2.7143 2.7143 2.7143 0 16.34.700057 0.94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1969 20.02.05 S3 R EQUIPOS ELÉCTRICOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1970 20.02.05.01 S3 R INSTALACIÓN DE EQUIPO 1 THERMA ELECTRICA 2 KW 220 V EN SERV und 0.00% 1.00 03/02/2022 09/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.14 1.2571429 0.14 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0 0.867.542857 0.84 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1971 21 S3 S MÓDULO S: CISTERNA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1972 21.01 S3 S DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1973 21.01.01 S3 S MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1974 21.01.01.01 S3 S EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1975 21.01.01.02 S3 S REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1976 21.01.01.03 S3 S TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1977 21.01.01.04 S3 S TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1978 21.01.01.05 S3 S MEJORAMIENTO CON MATERIAL GRANULAR m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1979 21.01.01.06 S3 S ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1980 21.01.01.07 S3 S ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1981 21.01.01.08 S3 S APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1982 08.01.02 S3 S CONCRETO SIMPLE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1983 21.01.02.01 S3 S CONCRETO SIMPLE PARA ZAPATAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1984 21.01.02.01.01 S3 S COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1985 21.01.02.02 S3 S CONCRETO SIMPLE PARA LOSAS DE EQUIPOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1986 21.01.02.02.01 S3 S COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 21.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1987 21.01.02.02.02 S3 S ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA PARA EQUIPOS m2 100.00% 0.00 21.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1988 21.01.02.03 S3 S CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1989 21.01.02.03.01 S3 S CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.00 21.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1990 09.01.02 S3 S 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1991 21.01.03.01 S3 S LOSA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1992 21.01.03.01.01 S3 S COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 21.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1993 21.01.03.01.02 S3 S ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 100.00% 0.00 21.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1994 21.01.03.01.03 S3 S SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 21.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1995 21.01.03.02 S3 S MUROS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
1996 21.01.03.02.01 S3 S COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1997 21.01.03.02.02 S3 S ENCOFRADO CARAVISTA Y DESENCOFRADO DE MURO m2 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1998 21.01.03.02.03 S3 S SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
1999 21.01.03.03 S3 S CANAL DE DRENAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2000 21.01.03.03.01 S3 S COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 02/12/2021 02/12/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2001 21.01.03.03.02 S3 S ENCOFRADO CARAVISTA Y DESENCOFRADO DE CANAL DE DRENAJE m2 100.00% 0.00 01/12/2021 02/12/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2002 21.01.03.03.03 S3 S SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO kg 100.00% 0.00 21/11/2021 22/11/2021 2.00 2.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2003 21.01.03.04 S3 S CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2004 21.01.03.04.01 S3 S CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.00 06/12/2021 08/12/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2005 21.01.03.05 S3 S SELLADO DE JUNTAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2006 21.01.03.05.01 S3 S SELLADO DE JUNTA TIPO 3 m 100.00% 0.00 09/12/2021 09/12/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2007 21.01.04 S3 S CARPINTERIA METALICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2008 21.01.04.01 S3 S SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 0.65m x 0.65m INC. A und 100.00% 0.00 29/10/2021 29/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2009 21.01.05 S3 S ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2010 21.01.05.01 S3 S MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2011 21.01.05.01.01 S3 S SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2012 21.01.05.01.01.01 S3 S ACERO ESTRUCTURAL TUBO 3"x1 1/2"x4.5mm kg 42.87% 83.98 17/12/2021 21/12/2021 5.00 5.00 16.80 83.98 X X 16.796 16.796 16.796 16.796 16.796 0 0 84 9.67 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2013 21.01.05.01.01.02 S3 S ACERO ESTRUCTURAL PLANCHA 1/2" kg 39.20% 5.47 17/12/2021 21/12/2021 5.00 5.00 1.09 5.47 X X 1.094 1.094 1.094 1.094 1.094 0 0 5.47 0.35 0.35 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2014 21.01.05.01.02 S3 S SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2015 21.01.05.01.02.01 S3 S ACERO ESTRUCTURAL TUBO 3"x1 1/2"x4.5mm kg 0.00% 90.00 17/12/2021 21/12/2021 5.00 5.00 18.00 90.00 X X 18 18 18 18 18 0 0 90 10.36 1.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2016 21.01.05.01.02.02 S3 S ACERO ESTRUCTURAL ANGULO L-3"x3"x3/16" kg 49.65% 2.01 17/12/2021 21/12/2021 5.00 5.00 0.40 2.01 X X 0.402 0.402 0.402 0.402 0.402 0 0 2.01 0.23 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2017 21.01.05.01.03 S3 S SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL VIGAS DE ARRIOSTRE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2018 21.01.05.01.03.01 S3 S ACERO ESTRUCTURAL TUBO 3"x1 1/2"x4.5mm kg 0.00% 149.00 17/12/2021 21/12/2021 5.00 5.00 29.80 149.00 X X 29.8 29.8 29.8 29.8 29.8 0 0 149 17.15 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2019 21.01.05.01.04 S3 S SUMINISTRO, INSTALACIÓN DE PANELES DE MALLA GALVANIZADA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2020 21.01.05.01.04.01 S3 S ACERO ESTRUCTURAL TUBO 1 1/2"x3/16" kg 0.00% 55.00 17/12/2021 21/12/2021 5.00 5.00 11.00 55.00 X X 11 11 11 11 11 0 0 55 6.33 1.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2021 21.01.05.01.04.02 S3 S MALLA GALVANIZADA #8 - 2"x2" kg 54.79% 49.28 17/12/2021 21/12/2021 5.00 5.00 9.86 49.28 X X 9.856 9.856 9.856 9.856 9.856 0 0 49.3 11.53 0.44 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2022 21.01.05.01.05 S3 S SUMINISTRO, INSTALACIÓN DE COBERTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2023 21.01.05.01.05.01 S3 S SUMINISTRO, INSTALACIÓN COBERTURA TR-4 m2 59.66% 4.84 17/12/2021 21/12/2021 5.00 5.00 0.97 4.84 X X 0.968 0.968 0.968 0.968 0.968 0 0 4.84 2.10 0.42 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2024 21.01.05.02 S3 S INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2025 21.01.05.02.01 S3 S INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y A kg 0.00% 29.00 17/12/2021 21/12/2021 5.00 5.00 5.80 29.00 X X 5.8 5.8 5.8 5.8 5.8 0 0 29 2.57 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2026 21.01.05.03 S3 S PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2027 21.01.05.03.01 S3 S PINTURA DE ELEMENTOS METALICOS m2 60.00% 29.20 17/12/2021 21/12/2021 5.00 5.00 5.84 29.20 X X 5.84 5.84 5.84 5.84 5.84 0 0 29.2 12.78 0.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2028 21.02 S3 S DISCIPLINA: INSTALACIONES SANITARIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2029 21.02.01 S3 S TUBERIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2030 21.02.01.01 S3 S 975-DW-2"-S1E0P-10002 / 10004 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2031 21.02.01.01.01 S3 S Pipe, A312TP316*, SMLS, Sch40S, PE, ø2" m 0.00% 5.00 04/01/2022 10/01/2022 7.00 7.00 0.71 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7143 0.7143 0.7143 2.14 21.428571 0.43 0.7143 0.7143 0.7143 0.7143 0 0 0 2.8571 28.5714286 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2032 21.02.01.01.02 S3 S Vlv-Chk, SpLPstn, A182F316L, CL800, SW, B16.34, BC, Trm12, Con canastill pza 0.00% 2.00 04/01/2022 10/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.2857 0.2857 0.2857 0.86 0 ### 0.2857 0.2857 0.2857 0.2857 0 0 0 1.1429 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2033 21.02.01.01.03 S3 S El, 90Deg, SW, A192F316L, CL3000, ø2" und 0.00% 2.00 04/01/2022 10/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.2857 0.2857 0.2857 0.86 0 ### 0.2857 0.2857 0.2857 0.2857 0 0 0 1.1429 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2034 21.02.01.01.04 S3 S Union, SW, A182F316L, CL3000, ø2" und 0.00% 2.00 04/01/2022 10/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.2857 0.2857 0.2857 0.86 0 ### 0.2857 0.2857 0.2857 0.2857 0 0 0 1.1429 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2035 21.02.01.02 S3 S 975-DW-2"-G1E0V-10003 / 10005 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2036 21.02.01.02.01 S3 S Pipe, A53-B-S, SMLS, StdWt, T&C, ø2" m 0.00% 2.20 04/01/2022 10/01/2022 7.00 7.00 0.31 2.20 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3143 0.3143 0.3143 0.94 24.122449 0.43 0.3143 0.3143 0.3143 0.3143 0 0 0 1.2571 32.1632653 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2037 21.02.01.02.02 S3 S Union, FNPT, A197, CL3000, ø2" und 0.00% 2.00 04/01/2022 10/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.2857 0.2857 0.2857 0.86 0 ### 0.2857 0.2857 0.2857 0.2857 0 0 0 1.1429 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2038 21.02.01.02.03 S3 S EXPANSION JOINT, CHLOROBUTYL / POLYESTER, CL300, ø2" und 0.00% 2.00 04/01/2022 10/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.2857 0.2857 0.2857 0.86 0 ### 0.2857 0.2857 0.2857 0.2857 0 0 0 1.1429 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2039 21.02.01.02.04 S3 S Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø2" pza 0.00% 2.00 04/01/2022 10/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.2857 0.2857 0.2857 0.86 0 ### 0.2857 0.2857 0.2857 0.2857 0 0 0 1.1429 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2040 21.02.01.02.05 S3 S Vlv-Chk, SpLPstn, A182F316L, CL800, SW, B16.34, BC, Trm12, ø2" pza 0.00% 2.00 04/01/2022 10/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.2857 0.2857 0.2857 0.86 0 ### 0.2857 0.2857 0.2857 0.2857 0 0 0 1.1429 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2041 21.02.01.02.06 S3 S FlgSW, A182-F316*, CL150, Sch40S, RF, StdF, B16.5, ø2" und 0.00% 4.00 04/01/2022 10/01/2022 7.00 7.00 0.57 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.5714 0.5714 0.5714 1.71 0 ### 0.5714 0.5714 0.5714 0.5714 0 0 0 2.2857 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2042 21.02.01.02.07 S3 S El, 90Deg, FNPT, A197, CL300 ø2" und 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2043 21.02.01.03 S3 S 975-DW-2"-G1E0V-10006 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2044 21.02.01.03.01 S3 S Pipe, A53-B-S, SMLS, StdWt, T&C, ø2" m 0.00% 3.45 04/01/2022 10/01/2022 7.00 7.00 0.49 3.45 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4929 0.4929 0.4929 1.48 16.071429 0.42 0.4929 0.4929 0.4929 0.4929 0 0 0 1.9714 21.4285714 0.56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2045 21.02.01.03.02 S3 S Te, FNPT. A197, CL300, ø2" und 0.00% 3.00 04/01/2022 10/01/2022 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.4286 0.4286 0.4286 1.29 0 ### 0.4286 0.4286 0.4286 0.4286 0 0 0 1.7143 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2046 21.02.01.03.03 S3 S El, 90Deg, FNPT, A197, CL300 ø2" und 0.00% 4.00 04/01/2022 10/01/2022 7.00 7.00 0.57 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.5714 0.5714 0.5714 1.71 0 ### 0.5714 0.5714 0.5714 0.5714 0 0 0 2.2857 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2047 21.02.01.03.04 S3 S Thredolet, A105, CL3000, ø2" und 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2048 21.02.01.03.05 S3 S RedTe, FNPT, A197, CL300, ø2"x3/4" und 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2049 21.02.01.03.06 S3 S RedTe, FNPT, A197, CL300, ø2"x1 1/2" und 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2050 21.02.01.03.07 S3 S Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø2" pza 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2051 21.02.01.03.08 S3 S FlgSW, A182-F316*, CL150, Sch40S, RF, StdF, B16.5, ø2" und 0.00% 3.00 04/01/2022 10/01/2022 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.4286 0.4286 0.4286 1.29 0 ### 0.4286 0.4286 0.4286 0.4286 0 0 0 1.7143 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2052 21.02.01.04 S3 S 975-DW-2"-G1E0V-10007 / 10008 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2053 21.02.01.04.01 S3 S Pipe, A53-B-S, SMLS, StdWt, T&C, ø2" m 0.00% 1.40 04/01/2022 10/01/2022 7.00 7.00 0.20 1.40 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2 0.2 0.2 0.6 10.714286 0.43 0.2 0.2 0.2 0.2 0 0 0 0.8 14.2857143 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2054 21.02.01.04.02 S3 S El, 90Deg, FNPT, A197, CL300 ø2" und 0.00% 2.00 04/01/2022 10/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.2857 0.2857 0.2857 0.86 0 ### 0.2857 0.2857 0.2857 0.2857 0 0 0 1.1429 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2055 21.02.01.04.03 S3 S RedTe, FNPT, A197, CL300, ø2"x1 1/2" und 0.00% 2.00 04/01/2022 10/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.2857 0.2857 0.2857 0.86 0 ### 0.2857 0.2857 0.2857 0.2857 0 0 0 1.1429 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2056 21.02.01.04.04 S3 S Union, FNPT, A197, CL3000, ø2" und 0.00% 2.00 04/01/2022 10/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.2857 0.2857 0.2857 0.86 0 ### 0.2857 0.2857 0.2857 0.2857 0 0 0 1.1429 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2057 21.02.01.04.05 S3 S Vlv-Gt, SldWdgIS, B62, CL125, FNPT, SP80, ISRSTB, BrzTrm, HW, ø2" pza 0.00% 2.00 04/01/2022 10/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.2857 0.2857 0.2857 0.86 0 ### 0.2857 0.2857 0.2857 0.2857 0 0 0 1.1429 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2058 21.02.01.04.06 S3 S FlgSW, A182-F316*, CL150, Sch40S, RF, StdF, B16.5, ø2" und 0.00% 4.00 04/01/2022 10/01/2022 7.00 7.00 0.57 4.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.5714 0.5714 0.5714 1.71 0 ### 0.5714 0.5714 0.5714 0.5714 0 0 0 2.2857 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2059 21.02.01.05 S3 S 975-DW-2"-G1E0V-10009 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2060 21.02.01.05.01 S3 S Pipe, A53-B-S, SMLS, StdWt, T&C,ø3/4" m 0.00% 0.10 04/01/2022 10/01/2022 7.00 7.00 0.01 0.10 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0143 0.0143 0.0143 0.04 5.0714286 0.42 0.0143 0.0143 0.0143 0.0143 0 0 0 0.0571 6.76190476 0.56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2061 21.02.01.05.02 S3 S REDUCTOR MACHO NPT DE 1/2" A 3/4" und 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2062 21.02.01.05.03 S3 S CONECTOR T 1/2" NPT, CON ROSCA INTERNA und 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2063 21.02.01.05.04 S3 S CONECTOR HEMBRA NPT 1/2" O.D. x 1/2" und 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2064 21.02.01.05.05 S3 S NIPLE CORTO DE 1/2" und 0.00% 6.00 04/01/2022 10/01/2022 7.00 7.00 0.86 6.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.8571 0.8571 0.8571 2.57 0 ### 0.8571 0.8571 0.8571 0.8571 0 0 0 3.4286 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2065 21.02.01.05.06 S3 S CODO DE 90º NPT DE 1/2" und 0.00% 3.00 04/01/2022 10/01/2022 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.4286 0.4286 0.4286 1.29 0 ### 0.4286 0.4286 0.4286 0.4286 0 0 0 1.7143 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2066 21.02.01.05.07 S3 S VÁLVULA DE BOLA 1/2" pza 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2067 21.02.01.05.08 S3 S VÁLVULA DE BOLA 3/4" pza 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2068 21.02.01.05.09 S3 S TAPÓN HEXAGONAL ROSCADO DE 1/2" und 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2069 21.02.01.05.10 S3 S PRESOSTATO MECÁNICO - FUELLE 1/2" und 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2070 21.02.01.05.11 S3 S MANOMETRO DE 4 1/2" DE DIAL CON LECTURA DIRECTA und 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2071 21.02.01.06 S3 S 975-DW-1 1/2"-G1E0V-100010 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2072 21.02.01.06.01 S3 S Pipe, A53-B-S, SMLS, StdWt, T&C,ø1 1/2" m 0.00% 1.60 04/01/2022 10/01/2022 7.00 7.00 0.23 1.60 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2286 0.2286 0.2286 0.69 7.6071429 0.42 0.2286 0.2286 0.2286 0.2286 0 0 0 0.9143 10.1428571 0.56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2073 21.02.01.06.02 S3 S Union, FNPT, A197, CL3000, ø1 1/2" und 0.00% 2.00 04/01/2022 10/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.2857 0.2857 0.2857 0.86 0 ### 0.2857 0.2857 0.2857 0.2857 0 0 0 1.1429 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2074 21.02.01.06.03 S3 S El, 90Deg, FNPT, A197, CL300, ø1 1/2" und 0.00% 2.00 04/01/2022 10/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.2857 0.2857 0.2857 0.86 0 ### 0.2857 0.2857 0.2857 0.2857 0 0 0 1.1429 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2075 21.02.01.06.04 S3 S Te, FNPT. A197, CL300, ø1 1/2" und 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2076 21.02.01.06.05 S3 S VALVULA DE ALIVIO, ø1 1/2" und 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2077 21.02.01.07 S3 S 975-DW-1 1/2"-G1E0V-100011 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2078 21.02.01.07.01 S3 S Pipe, A53-B-S, SMLS, StdWt, T&C,ø1 1/2" m 0.00% 0.80 04/01/2022 10/01/2022 7.00 7.00 0.11 0.80 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1143 0.1143 0.1143 0.34 2.5928571 0.43 0.1143 0.1143 0.1143 0.1143 0 0 0 0.4571 3.45714286 0.58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2079 21.02.01.07.02 S3 S Union, FNPT, A197, CL3000, ø1 1/2" und 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2080 21.02.01.07.03 S3 S Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO,ø1 1/2" pza 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2081 21.02.01.08 S3 S 975-DW-1 1/2"-G1E0V-100012 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2082 21.02.01.08.01 S3 S Pipe, A53-B-S, SMLS, StdWt, T&C,ø1 1/2" m 0.00% 0.80 04/01/2022 10/01/2022 7.00 7.00 0.11 0.80 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1143 0.1143 0.1143 0.34 2.8928571 0.41 0.1143 0.1143 0.1143 0.1143 0 0 0 0.4571 3.85714286 0.55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2083 21.02.01.08.02 S3 S Vlv-Bal, EEntry, B62, 600WOG, FNPT, 316TFE, LO,ø1 1/2" pza 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.1429 0.1429 0.1429 0.43 0 ### 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2084 21.02.02 S3 S MECÁNICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2085 21.02.02.01 S3 S SOPORTERIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2086 21.02.02.01.01 S3 S GA-GS13-2" pza 0.00% 6.00 04/01/2022 10/01/2022 7.00 7.00 0.86 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.8571 0.8571 0.8571 2.57 6.8571429 0.43 0.8571 0.8571 0.8571 0.8571 0 0 0 3.4286 9.14285714 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2087 21.02.02.01.02 S3 S GA-GS13-1 1/2" pza 0.00% 2.00 04/01/2022 10/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2857 0.2857 0.2857 0.86 3.4285714 0.43 0.2857 0.2857 0.2857 0.2857 0 0 0 1.1429 4.57142857 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2088 21.02.02.02 S3 S PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2089 21.02.02.02.01 S3 S PINTURA DE TUBERIAS m2 0.00% 3.00 04/01/2022 10/01/2022 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4286 0.4286 0.4286 1.29 1.9285714 0.39 0.4286 0.4286 0.4286 0.4286 0 0 0 1.7143 2.57142857 0.51 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2090 21.02.02.03 S3 S EQUIPOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2091 21.02.02.03.01 S3 S SUMINISTRO E INSTALACION DE ELECTROBOMBA 1.5 HP, INCLUYE und 0.00% 2.00 04/01/2022 08/01/2022 5.00 5.00 0.40 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4 0.4 0.4 1.2 13.5 0.59 0.4 0.4 0 0 0 0 0 0.8 9 0.39 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2092 21.02.02.03.02 S3 S SUMINISTRO E INSTALACIÓN DE TANQUE HIDRONEUMÁTICO DE 62 GAL.und 0.00% 2.00 04/01/2022 08/01/2022 5.00 5.00 0.40 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4 0.4 0.4 1.2 13.5 0.59 0.4 0.4 0 0 0 0 0 0.8 9 0.39 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2093 21.03 S3 S DISCIPLINA: INSTALACIONES ELÉCTRICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2094 21.03.01 S3 S SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2095 21.03.01.01 S3 S ARTEFACTO DE ALUMBRADO LITHONIA LIGHTING FEM L48 8000LM LPPF pto 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 3.12 0.45 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 4.16 0.59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2096 21.03.01.02 S3 S SUMINISTRO Y MONTAJE DE ARTEFACTO DE ALUMBRADO HOLOPHANE pto 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 1.2571286 0.42 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 1.67617143 0.56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2097 21.03.01.03 S3 S SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON 1286W pto 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 0.7542857 0.38 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 1.00571429 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2098 21.03.01.04 S3 S SUMINISTRO Y MONTAJE DE TOMACORRIENTE DOBLE, LEVINTON 5462- pto 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 1.8857143 0.47 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 2.51428571 0.63 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2099 21.03.02 S3 S TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2100 21.03.02.01 S3 S SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-DPA-1150 und 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 38.575286 0.43 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 51.4337143 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2101 21.03.02.02 S3 S SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-COA-959 und 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 25.714286 0.43 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 34.2857143 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2102 21.03.03 S3 S CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2103 21.03.03.01 S3 S SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 51.00 04/01/2022 10/01/2022 7.00 7.00 7.29 51.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.2857 7.2857 7.2857 21.9 17.483529 0.43 7.2857 7.2857 7.2857 7.2857 0 0 0 29.143 23.3113714 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2104 21.03.03.02 S3 S SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 66.00 04/01/2022 10/01/2022 7.00 7.00 9.43 66.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9.4286 9.4286 9.4286 28.3 25.539171 0.43 9.4286 9.4286 9.4286 9.4286 0 0 0 37.714 34.0522286 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2105 21.03.04 S3 S CONDUCTORES Y CABLES DE ENERGIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2106 21.03.04.01 S3 S SUMINISTRO E INSTALACIÓN DE CABLE TIPO 2-1/C #12 AWG+GRD; XHHW M 0.00% 13.00 04/01/2022 10/01/2022 7.00 7.00 1.86 13.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.8571 1.8571 1.8571 5.57 1.6079143 0.4 1.8571 1.8571 1.8571 1.8571 0 0 0 7.4286 2.14388571 0.54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2107 21.03.04.02 S3 S SUMINISTRO E INSTALACIÓN DE CABLE TIPO 1-2/C #12 AWG+GRD; XHHW M 0.00% 33.00 04/01/2022 10/01/2022 7.00 7.00 4.71 33.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.7143 4.7143 4.7143 14.1 4.0816286 0.41 4.7143 4.7143 4.7143 4.7143 0 0 0 18.857 5.44217143 0.54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2108 21.03.04.03 S3 S SUMINISTRO E INSTALACIÓN DE CABLE 1-3/c #12 AWG + GRD, XHHW-2, 0 m 0.00% 38.00 04/01/2022 10/01/2022 7.00 7.00 5.43 38.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.4286 5.4286 5.4286 16.3 4.7000571 0.43 5.4286 5.4286 5.4286 5.4286 0 0 0 21.714 6.26674286 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2109 21.03.05 S3 S SISTEMA DE BOMBEO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2110 21.03.05.01 S3 S INSTALACION ELETRICA DE SISTEMA DE BOMBEO GLB 0.00% 1.00 04/01/2022 10/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 0.4285714 0.43 0.1429 0.1429 0.1429 0.1429 0 0 0 0.5714 0.57142857 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2111 21.04 S3 S DISCIPLINA: INSTRUMENTACIÓN Y CONTROL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2112 21.04.01 S3 S INSTRUMENTACIÓN Y CONTROL DE ELECTROBOMBA Y TANQUE HIDRON GLB 0.00% 1.00 11/01/2022 14/01/2022 4.00 4.00 0.25 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.25 0.25 0.25 0.75 0.75 0.75 0.25 0 0 0 0 0 0 0.25 0.25 0.25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2113 22 S5 SI&E SEÑALIZACION INTERNA Y EXTERNA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2114 22.01 S5 SI&E DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2115 22.01.01 S5 SI&E MOVIMIENTO DE TIERRAS PARA SEÑALIZACIÓN EXTERNA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2116 22.01.01.01 S5 SI&E EXCAVACION PARA DADOS DE ANCLAJE m3 0.00% 14.00 15/01/2022 21/01/2022 7.00 7.00 2.00 14.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 2 2 2 12 74.4 0.86 2 0 0 0 0 0 0 2 12.4 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2117 22.01.01.02 S5 SI&E REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.00% 139.00 15/01/2022 21/01/2022 7.00 7.00 19.86 139.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19.857 19.857 19.857 19.857 19.857 19.857 119 15.19071 0.84 19.857 0 0 0 0 0 0 19.9 2.531786 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2118 22.01.01.03 S5 SI&E TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 0.00% 12.00 15/01/2022 21/01/2022 7.00 7.00 1.71 12.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.7143 1.7143 1.7143 1.7143 1.7143 1.7143 10.3 1.594286 0.8 1.7143 0 0 0 0 0 0 1.71 0.265714 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2119 22.01.01.04 S5 SI&E TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 0.00% 64.00 15/01/2022 21/01/2022 7.00 7.00 9.14 64.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9.1429 9.1429 9.1429 9.1429 9.1429 9.1429 54.9 2.011429 1.01 9.1429 0 0 0 0 0 0 9.14 0.335238 0.17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2120 22.01.01.05 S5 SI&E RELLENO CON PIEDRA CHANCADA 3/4" m3 0.00% 9.00 15/01/2022 21/01/2022 7.00 7.00 1.29 9.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.2857 1.2857 1.2857 1.2857 1.2857 1.2857 7.71 13.69286 0.86 1.2857 0 0 0 0 0 0 1.29 2.282143 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2121 22.01.01.06 S5 SI&E ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.00% 17.00 15/01/2022 21/01/2022 7.00 7.00 2.43 17.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.4286 2.4286 2.4286 2.4286 2.4286 2.4286 14.6 1.6728 0.84 2.4286 0 0 0 0 0 0 2.43 0.2788 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2122 22.01.01.07 S5 SI&E ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.00% 33.00 15/01/2022 21/01/2022 7.00 7.00 4.71 33.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.7143 4.7143 4.7143 4.7143 4.7143 4.7143 28.3 1.320943 0.66 4.7143 0 0 0 0 0 0 4.71 0.220157 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2123 22.01.01.08 S5 SI&E APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 0.00% 17.00 15/01/2022 21/01/2022 7.00 7.00 2.43 17.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.4286 2.4286 2.4286 2.4286 2.4286 2.4286 14.6 3.422078 0.86 2.4286 0 0 0 0 0 0 2.43 0.570346 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2124 10.01.02 S5 SI&E CONCRETO SIMPLE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2125 22.01.02.01 S5 SI&E CONCRETO SIMPLE PARA DADOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2126 22.01.02.01.01 S5 SI&E COLOCACIÓN DE CONCRETO F'c=10 MPa m3 0.00% 14.00 25/12/2021 01/01/2022 8.00 8.00 1.75 14.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 1.75 1.75 1.75 1.75 1.75 1.75 10.5 64.85325 0.75 1.75 1.75 0 0 0 0 0 3.5 21.61775 0.25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2127 22.01.02.01.02 S5 SI&E ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 3.00 24/12/2021 30/12/2021 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 3 7.4118 1.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2128 22.01.03 S5 SI&E MANTENIMIENTO, TRASLADO Y REUBICACIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2129 22.01.03.01 S5 SI&E MANTENIMIENTO, TRASLADO Y REUBICACIÓN DE LETREROS GLB 0.00% 1.00 24/12/2021 30/12/2021 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 31 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2130 22.01.03.02 S5 SI&E MANTENIMIENTO, TRASLADO Y REUBICACIÓN DE CILINDROS DE CONC GLB 0.00% 1.00 24/12/2021 30/12/2021 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 31 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2131 22.01.03.03 S5 SI&E MANTENIMIENTO, TRASLADO Y REUBICACIÓN DE JARDINERAS GLB 0.00% 1.00 24/12/2021 30/12/2021 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 31 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2132 22.01.04 S5 SI&E SEÑALIZACION INTERNA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2133 22.01.04.01 S5 SI&E SUMINISTRO E INSTALACIÓN DE SEÑALIZACIÓN INTERNA EN TALLER GLB 0.00% 1.00 27/12/2021 30/12/2021 4.00 4.00 0.25 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0.25 0.25 0.25 0.25 1 31 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2134 22.01.04.02 S5 SI&E SUMINISTRO E INSTALACIÓN DE SEÑALIZACIÓN EN PUNTO DE REUNI GLB 0.00% 1.00 27/12/2021 30/12/2021 4.00 4.00 0.25 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0.25 0.25 0.25 0.25 1 16 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2135 22.01.05 S5 SI&E CARPINTERIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2136 22.01.05.01 S5 SI&E SUMINISTRO E INSTALACIÓN DE POSTES DE MADERA DE 4"x4" p2 0.00% 545.00 27/12/2021 30/12/2021 4.00 4.00 136.25 545.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 136.25 136.25 136.25 136.25 545 163.5 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2137 22.01.06 S5 SI&E ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2138 22.01.06.01 S5 SI&E SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL SEÑALIZACIÓN EXTERNA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2139 22.01.06.01.01 S5 SI&E TUBERIA DE FIERRO GALVANIZADO 2.5" Ø SCH 40 kg 0.00% 494.00 24/12/2021 26/12/2021 3.00 3.00 164.67 494.00 X X 0 0 0 0 0 0 0 0 0.00 0 164.67 164.67 164.67 0 0 0 0 494 40.639854 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2140 22.01.06.01.02 S5 SI&E ACERO ESTRUCTURAL TUBO DE 4"x4"x3mm kg 0.00% 221.00 24/12/2021 26/12/2021 3.00 3.00 73.67 221.00 X X 0 0 0 0 0 0 0 0 0.00 0 73.667 73.667 73.667 0 0 0 0 221 25.434783 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2141 22.01.06.01.03 S5 SI&E ACERO ESTRUCTURAL PLANCHA DE 3/16" kg 0.00% 758.00 24/12/2021 26/12/2021 3.00 3.00 252.67 758.00 X X 0 0 0 0 0 0 0 0 0.00 0 252.67 252.67 252.67 0 0 0 0 758 48.451705 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2142 22.01.06.01 S5 SI&E INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2143 22.01.06.01.01 S5 SI&E INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y A kg 0.00% 74.00 27/12/2021 29/12/2021 3.00 3.00 24.67 74.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 24.667 24.667 24.667 0 74 6.0877514 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2144 22.01.06.01 S5 SI&E PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2145 22.01.06.01.01 S5 SI&E PINTURA DE ELEMENTOS METALICOS m2 60.00% 16.80 24/12/2021 30/12/2021 7.00 7.00 2.40 16.80 X X 0 0 0 0 0 0 0 0 0.00 0 2.4 2.4 2.4 2.4 2.4 2.4 2.4 16.8 1.3820841 0.46 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2146 23 S5 INSTALACIONES ELECTRICAS EXTERNAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2147 23.01 S5 AEL23KV ACOMETIDA ELECTRICA DESDE LINEA 23KV A SUB ESTACIÓN (LÍNEA AÉREA) 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2148 23.01.01 S5 AEL23KV DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2149 23.01.01.01 S5 AEL23KV MOVIMIENTO DE TIERRAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2150 23.01.01.01.01 S5 AEL23KV EXCAVACION DE HOYO P/CIMIENTO DE POSTE 90 PIES m3 100.00% 0.00 #N/A 1.00 #N/A 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2151 23.01.01.01.02 S5 AEL23KV EXCAVACION DE HOYO P/RETENIDA INCLINADA DOBLE m3 100.00% 0.00 19/11/2021 22/11/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2152 23.01.01.01.03 S5 AEL23KV EXCAVACION DE ZANJA PARA TENDIDO DE CABLE m3 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2153 23.01.01.01.04 S5 AEL23KV TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.00 #N/A 1.00 #N/A 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2154 23.01.01.01.05 S5 AEL23KV TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 100.00% 0.00 #N/A 1.00 #N/A 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2155 23.01.01.01.06 S5 AEL23KV RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 100.00% 0.00 #N/A 1.00 #N/A 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2156 23.01.01.01.07 S5 AEL23KV RELLENO ESTRUCTURAL CON MATERIAL PROPIO SELECCIONADO m3 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2157 23.01.01.01.08 S5 AEL23KV ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.00 23/11/2021 23/11/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2158 23.01.01.01.09 S5 AEL23KV ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2159 23.01.01.01.10 S5 AEL23KV APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.00 22/10/2021 22/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2160 23.01.01.02 S5 AEL23KV CONCRETO SIMPLE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2161 23.01.01.02.01 S5 AEL23KV COLOCACIÓN DE CONCRETO F'c=10 MPa m3 100.00% 0.00 #N/A 1.00 #N/A 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2162 23.01.02 S5 AEL23KV DISCIPLINA: INSTALACIONES ELÉCTRICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2163 23.01.02.01 S5 AEL23KV SUMINISTRO E INSTALACIÓN DE POSTES DE MADERA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2164 23.01.02.01.01 S5 AEL23KV SUMINISTRO Y DESCARGO DE POTES DE MADERA DE 90PIES und 100.00% 0.00 7.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2165 23.01.02.01.02 S5 AEL23KV TRASLADO DE POSTE DE MADERA DE 90PIES DE ALMACEN A PUNTO D und 100.00% 0.00 7.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2166 23.01.02.01.03 S5 AEL23KV IZAJE DE POSTE DE MADERA DE 90 PIES und 100.00% 0.00 7.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2167 23.01.02.01.04 S5 AEL23KV ROTULADO Y CODIFICADO DE POSTES MADERA MEDIA TENSION (Inc. Torul
und 42.86% 2.29 24/12/2021 30/12/2021 7.00 7.00 0.33 2.29 X X 0 0 0 0 0 0 0 0 0.00 0 0.3271 0.3271 0.3271 0.3271 0.3271 0.3271 0.3271 2.29 8.4272 0.56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2168 23.01.02.02 S5 AEL23KV SUMINISTRO Y MONTAJE DE ARMADOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2169 23.01.02.02.01 S5 AEL23KV SUMINISTRO Y MONTAJE DE ARMADO - PUNTO ALIMENTACION und 100.00% 0.00 19/11/2021 25/11/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2170 23.01.02.02.02 S5 AEL23KV SUMINISTRO Y MONTAJE DE ARMADO - TIPO PR und 100.00% 0.00 26/11/2021 02/12/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2171 23.01.02.02.03 S5 AEL23KV SUMINISTRO Y MONTAJE DE ARMADO - TIPO PS und 100.00% 0.00 26/11/2021 02/12/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2172 23.01.02.02.04 S5 AEL23KV SUMINISTRO Y MONTAJE DE ARMADO - TERMINAL und 100.00% 0.00 26/11/2021 02/12/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2173 23.01.02.02.05 S5 AEL23KV SUMINISTRO E INSTALACIÓN DE LOAD BREAKER SWICH 38KV, 200KVB und 100.00% 0.00 26/11/2021 02/12/2021 7.00 7.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2174 23.01.02.03 S5 AEL23KV PUESTA A TIERRA DE POSTES DE ENERGIA ELECTRICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2175 23.01.02.03.01 S5 AEL23KV PUESTA A TIERRA DE POSTES DE ENERGIA ELECTRICA und 100.00% 0.00 19/11/2021 21/11/2021 3.00 3.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2176 23.01.02.04 S5 AEL23KV SUMINISTRO Y MONTAJE DE CONDUCTORES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2177 23.01.02.04.01 S5 AEL23KV SUMINISTRO, TENDIDO Y PUESTA A FLECHA DE CABLES AAAC 3 x 24 m 0.00% 630.00 31/12/2021 13/01/2022 14.00 14.00 45.00 630.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 45 45 45 45 45 45 45 315 168.651 0.5 45 45 45 45 45 45 45 315 168.651 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2178 23.01.02.04.02 S5 AEL23KV SUMINISTRO, TENDIDO Y PUESTA A FLECHA DE CABLES DE GUARDA m 0.00% 262.50 31/12/2021 13/01/2022 14.00 14.00 18.75 262.50 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 18.75 18.75 18.75 18.75 18.75 18.75 18.75 131 15.238125 0.51 18.75 18.75 18.75 18.75 18.75 18.75 18.75 131.25 15.238125 0.51 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2179 23.01.02.05 S5 AEL23KV SUMINISTRO E INSTALACION DE RETENIDAS EN MT 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2180 23.01.02.05.01 S5 AEL23KV SUMINISTRO Y MONTAJE DE RETENIDO INCLINADA TRIPLE und 0.00% 3.00 31/12/2021 07/01/2022 8.00 8.00 0.38 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.375 0.375 0.375 0.375 0.375 0.375 0.375 2.63 39.9 0.87 0.375 0 0 0 0 0 0 0.375 5.7 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2181 23.01.02.06 S5 AEL23KV SUMINISTRO E INSTALACION DE REDES SUBTERRANEAS EN 23KV 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2182 23.01.02.06.01 S5 AEL23KV SUMINISTRO E INSTALACION DE CABLE TIPO 3-1/c #250mcm + SHD m 0.00% 156.00 31/12/2021 14/01/2022 15.00 15.00 10.40 156.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 10.4 10.4 10.4 10.4 10.4 10.4 10.4 72.8 117.6448 0.47 10.4 10.4 10.4 10.4 10.4 10.4 10.4 72.8 117.6448 0.47 10.4 0 0 0 0 0 0 10.4 16.8064 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2183 23.01.02.06.02 S5 AEL23KV INSTALACION DE TERMINALES TERMOCONTRAIBLES PARA CABLE 3-1/ kit 0.00% 1.00 31/12/2021 14/01/2022 15.00 15.00 0.07 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.47 2.3333333 0.47 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.4667 2.33333333 0.47 0.0667 0 0 0 0 0 0 0.07 0.333333 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2184 23.01.02.07 S5 AEL23KV PRUEBAS Y PUESTA EN SERVICIO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2185 23.01.02.07.01 S5 AEL23KV PRUEBA Y PUESTA EN SERVICIO DE LA ACOMETIDA EN 23KV GLB 0.00% 1.00 31/12/2021 07/01/2022 8.00 8.00 0.13 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.88 1.75 0.88 0.125 0 0 0 0 0 0 0.125 0.25 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2186 23.01.03 S5 AEL23KV DISCIPLINA: INSTRUMENTACIÓN Y CONTROL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2187 23.01.03.01 S5 AEL23KV SUMINISTRO E INSTALACIÓN DE POSTES DE MADERA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2188 23.01.03.01.01 S5 AEL23KV SUMINISTRO Y DESCARGO DE POTES DE MADERA DE 90PIES und 100.00% 0.00 31/12/2021 04/01/2022 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2189 23.01.03.01.02 S5 AEL23KV TRASLADO DE POSTE DE MADERA DE 90PIES DE ALMACEN A PUNTO D und 100.00% 0.00 31/12/2021 04/01/2022 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2190 23.01.03.01.03 S5 AEL23KV IZAJE DE POSTE DE MADERA DE 90 PIES und 100.00% 0.00 Err:507 Err:507 5.00Err:507 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2191 23.01.03.01.04 S5 AEL23KV ROTULADO Y CODIFICADO DE POSTES MADERA MEDIA TENSION (Inc. Torul
und 100.00% 0.00 Err:507 Err:507 5.00Err:507 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2192 23.01.03.02 S5 AEL23KV SUMINISTRO Y MONTAJE DE ARMADOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2193 23.01.03.02.01 S5 AEL23KV SUMINISTRO Y MONTAJE DE ARMADO DE FIBRA OPTICA EN POSTE EX und 0.00% 1.00 31/12/2021 06/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 3.2001 1.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2194 23.01.03.02.02 S5 AEL23KV SUMINISTRO Y MONTAJE DE ARMADO EN FIBRA OPTICA EN POSTE E und 0.00% 1.00 31/12/2021 06/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 2.4 1.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2195 23.01.03.02.03 S5 AEL23KV SUMINISTRO Y MONTAJE DE ARMADO DE FIBRA OPTICA EN POSTE und 0.00% 1.00 31/12/2021 06/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 1.92 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2196 23.01.03.02.04 S5 AEL23KV SUMINISTRO Y MONTAJE DE ARMADO DE FIBRA OPTICA EN POSTE und 0.00% 1.00 31/12/2021 06/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 2.0001 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2197 23.01.03.02.05 S5 AEL23KV SUMINISTRO Y MONTAJE DE ARMADO DE FIBRA OPTICA EN POSTE P und 0.00% 1.00 31/12/2021 06/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 1.8461 0.92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2198 23.01.03.02.06 S5 AEL23KV MONTAJE DE ARMADO DE FIBRA OPTICA EN POSTE PASANTE- P12.03 und 0.00% 1.00 31/12/2021 06/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 1.5999 0.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2199 23.01.03.03 S5 AEL23KV SUMINISTRO Y MONTAJE DE CONDUCTORES DE FIBRA OPTICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2200 23.01.03.03.01 S5 AEL23KV SUMINISTRO, TENDIDO Y PUESTA A FLECHA DE CABLES FIBRA OPTI m 0.00% 416.00 14/01/2022 20/01/2022 7.00 7.00 59.43 416.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 59.429 59.429 59.429 59.429 59.429 59.429 59.429 416 62.1088 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2201 23.01.03.04 S5 AEL23KV SUMINISTRO E INSTALACION DE REDES SUBTERRANEAS EN TRAMO 01 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2202 23.01.03.04.01 S5 AEL23KV SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 69.00 14/01/2022 20/01/2022 7.00 7.00 9.86 69.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9.8571 9.8571 9.8571 9.8571 9.8571 9.8571 9.8571 69 55.1931 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2203 23.01.03.05 S5 AEL23KV PRUEBAS Y PUESTA EN SERVICIO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2204 23.01.03.05.01 S5 AEL23KV PRUEBA Y PUESTA EN SERVICIO DE LA ACOMETIDA FIBRA OPTICA 2 GLB 0.00% 1.00 14/01/2022 20/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 104 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2205 23.02 S2 T SUB ESTACIÓN DE 600KVA, 23/0.48/0.40-0.23KV, 4300msnm (INCLUYE MONTAJE Y SUMINISTRO) 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2206 23.02.01 S2 T DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2207 23.02.01.01 S2 T MOVIMIENTO DE TIERRAS EN LOSAS, ZAPATAS Y RAMPAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2208 23.02.01.01.01 S2 T EXCAVACION P/ZAPATAS m3 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2209 23.02.01.01.02 S2 T EXCAVACION DE ZANJAS P/ESTRUCTURAS m3 100.00% 0.00 14.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2210 23.02.01.01.03 S2 T REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2211 23.02.01.01.04 S2 T RELLENO MATERIAL PROPIO SELECCIONADO m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2212 23.02.01.01.05 S2 T ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2213 23.02.01.01.06 S2 T ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2214 23.02.01.01.07 S2 T APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.00 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2215 14.01.02 S2 T CONCRETO SIMPLE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2216 23.02.01.02.01 S2 T CONCRETO SIMPLE PARA ZAPATAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2217 23.02.01.02.01.01 S2 T COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 0.00 9.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2218 23.02.01.02.02 S2 T CONCRETO SIMPLE PARA LOSAS DE EQUIPOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2219 23.02.01.02.02.01 S2 T COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 MPa m3 100.00% 0.00 06/12/2021 06/12/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2220 23.02.01.02.03 S2 T CONCRETO SIMPLE PARA DADOS DE CONCRETO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2221 23.02.01.02.03.01 S2 T COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 1.00 23/12/2021 23/12/2021 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 1 1 5.83 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2222 15.01.02 S2 T CONCRETO SIMPLE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2223 23.02.01.03.01 S2 T ZAPATAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2224 23.02.01.03.01.01 S2 T COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 9.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2225 23.02.01.03.01.02 S2 T SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 100.00% 0.00 9.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2226 23.02.01.03.01 S2 T PEDESTAL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2227 23.02.01.03.01.01 S2 T COLOCACIÓN DE CONCRETO F'c=30 MPa m3 100.00% 0.00 27/10/2021 27/10/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2228 23.02.01.03.01.02 S2 T ENCOFRADO CARAVISTA Y DESENCOFRADO DE PEDESTAL m2 100.00% 0.00 22/10/2021 26/10/2021 5.00 5.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2229 23.02.01.03.01.03 S2 T SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 100.00% 0.00 9.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2230 23.02.01.03.01 S2 T LOSA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2231 23.02.01.03.01.01 S2 T COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 20.00 28/12/2021 28/12/2021 1.00 1.00 20.00 20.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 20 0 0 20 116.666 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2232 23.02.01.03.01.02 S2 T ENCOFRADO CARAVISTA Y DESENCOFRADO DE LOSA m2 0.00% 7.00 26/12/2021 27/12/2021 2.00 2.00 3.50 7.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 3.5 3.5 0 0 0 7 17.294118 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2233 23.02.01.03.01.03 S2 T SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 0.00% 945.00 24/12/2021 25/12/2021 2.00 2.00 472.50 945.00 X X 0 0 0 0 0 0 0 0 0.00 0 472.5 472.5 0 0 0 0 0 945 110.25 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2234 23.02.01.03.01 S2 T MUROS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2235 23.02.01.03.01.01 S2 T COLOCACIÓN DE CONCRETO F'c=30 MPa m3 0.00% 4.00 28/12/2021 28/12/2021 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 4 0 0 4 23.3332 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2236 23.02.01.03.01.02 S2 T ENCOFRADO CARAVISTA Y DESENCOFRADO DE MURO m2 0.00% 19.00 26/12/2021 27/12/2021 2.00 2.00 9.50 19.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 9.5 9.5 0 0 0 19 66.5 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2237 23.02.01.03.01.03 S2 T SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 0.00% 622.00 24/12/2021 25/12/2021 2.00 2.00 311.00 622.00 X X 0 0 0 0 0 0 0 0 0.00 0 311 311 0 0 0 0 0 622 72.566667 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2238 23.02.01.03.01 S2 T CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2239 23.02.01.03.01.01 S2 T CURADO DE CONCRETO CON ANTISOL m2 50.00% 54.50 01/01/2022 04/01/2022 4.00 4.00 13.63 54.50 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 13.625 13.625 13.625 13.625 0 0 54.5 7.49375 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2240 23.02.01.04 S2 T APLICACIÓN DE GROUT E IMPERMEABILIZANTE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2241 23.02.01.04.01 S2 T GROUT PARA PEDESTAL E=2.5CM m2 0.00% 1.00 27/01/2022 30/01/2022 4.00 4.00 0.25 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.25 0.25 2.734978 0.25 0.25 0.25 0.25 0 0 0 0 0.75 8.2049338 0.75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2242 23.02.01.05 S2 T ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2243 23.02.01.05.01 S2 T MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2244 23.02.01.05.01.01 S2 T SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL COLUMNAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2245 23.02.01.05.01.01.01S2 T ACERO ESTRUCTURAL TUBO 6"x6"x316" kg 60.00% 159.60 13/01/2022 19/01/2022 7.00 7.00 22.80 159.60 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22.8 22.8 1.38088829 0.06 22.8 22.8 22.8 22.8 22.8 22.8 0 137 8.28533 0.35 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2246 23.02.01.05.01.01.02S2 T ACERO ESTRUCTURAL PLANCHA 1/2" kg 60.00% 40.80 13/01/2022 19/01/2022 7.00 7.00 5.83 40.80 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.8286 5.8286 0.37256494 0.05 5.8286 5.8286 5.8286 5.8286 5.8286 5.8286 0 35 2.23539 0.32 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2247 23.02.01.05.01.02 S2 T SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TIJERALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2248 23.02.01.05.01.02.01S2 T ACERO ESTRUCTURAL TUBO 6"x6"x316" kg 30.80% 425.58 20/01/2022 26/01/2022 7.00 7.00 60.80 425.58 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60.797 60.8 3.682196 0.1 60.797 60.797 60.797 60.797 60.797 60.797 0 365 22.09317 0.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2249 23.02.01.05.01.03 S2 T SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL CORREAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2250 23.02.01.05.01.03.01S2 T ACERO ESTRUCTURAL PERFIL U 6"x2"x4.5mm kg 28.73% 287.94 20/01/2022 26/01/2022 7.00 7.00 41.13 287.94 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 41.134 41.1 3.643785 0.1 41.134 41.134 41.134 41.134 41.134 41.134 0 247 21.86271 0.61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2251 23.02.01.05.01.03.02S2 T ACERO ESTRUCTURAL ANGULO 4"x4"x1/4" kg 0.00% 30.00 20/01/2022 26/01/2022 7.00 7.00 4.29 30.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.2857 4.29 0.36526 0.12 4.2857 4.2857 4.2857 4.2857 4.2857 4.2857 0 25.7 2.191558 0.73 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2252 23.02.01.05.01.04 S2 T SUMINISTRO, INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL TEMPLADORES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2253 23.02.01.05.01.04.01S2 T ACERO ESTRUCTURAL FIERRO LISO Ø5/8" kg 3.24% 30.96 20/01/2022 26/01/2022 7.00 7.00 4.42 30.96 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.4229 4.42 0.471951 0.16 4.4229 4.4229 4.4229 4.4229 4.4229 4.4229 0 26.5 2.831707 0.94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2254 23.02.01.05.01.05 S2 T SUMINISTRO, INSTALACIÓN DE COBERTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2255 23.02.01.05.01.05.01S2 T SUMINISTRO, INSTALACIÓN COBERTURA TR-4 m2 59.66% 37.12 20/01/2022 26/01/2022 7.00 7.00 5.30 37.12 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.3029 5.3 2.297905 0.06 5.3029 5.3029 5.3029 5.3029 5.3029 5.3029 0 31.8 13.78743 0.34 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2256 23.02.01.05.01.06 S2 T SUMINISTRO, INSTALACIÓN DE CUMBRERA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2257 23.02.01.05.01.06.01S2 T SUMINISTRO, INSTALACIÓN DE CUMBRERA TR-4 m 60.00% 3.20 20/01/2022 26/01/2022 7.00 7.00 0.46 3.20 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4571 0.46 0.076992 0.08 0.4571 0.4571 0.4571 0.4571 0.4571 0.4571 0 2.74 0.461955 0.46 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2258 23.02.01.05.01.07 S2 T INSTALACIÓN E IZAJE ACERO ESTRUCTURAL CERCO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2259 23.02.01.05.01.07.01S2 T ACERO ESTRUCTURAL TUBO DE F°G° Ø3" SCH40 kg 0.00% 139.00 20/01/2022 26/01/2022 7.00 7.00 19.86 139.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19.857 19.9 2.078073 0.14 19.857 19.857 19.857 19.857 19.857 19.857 0 119 12.46844 0.83 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2260 23.02.01.05.01.07.02S2 T ACERO ESTRUCTURAL TUBO DE F°G° Ø2" SCH40 kg 0.00% 184.00 20/01/2022 26/01/2022 7.00 7.00 26.29 184.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 26.286 26.3 2.750831 0.14 26.286 26.286 26.286 26.286 26.286 26.286 0 158 16.50498 0.87 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2261 23.02.01.05.01.07.03S2 T ACERO ESTRUCTURAL TUBO DE F°G° Ø1 1/2" SCH40 kg 0.00% 22.00 20/01/2022 26/01/2022 7.00 7.00 3.14 22.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.1429 3.14 0.36171 0.12 3.1429 3.1429 3.1429 3.1429 3.1429 3.1429 0 18.9 2.170259 0.72 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2262 23.02.01.05.01.07.04S2 T TEMPLADOR DE FIERRO LISO F°G° Ø3/8" SCH40 kg 0.00% 5.00 20/01/2022 26/01/2022 7.00 7.00 0.71 5.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7143 0.71 0.07622 0.08 0.7143 0.7143 0.7143 0.7143 0.7143 0.7143 0 4.29 0.457317 0.46 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2263 23.02.01.05.01.07.05S2 T TEMPLADOR ALAMBRE F°G° N°8 kg 0.00% 1.00 20/01/2022 26/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0.1429 0.14 0.025714 ### 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0 0.86 0.154286 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2264 23.02.01.05.01.07.06S2 T ACCESORIOS PARA POSTE DE CERCO GLB 0.00% 1.00 20/01/2022 26/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.14 0.628571 0.16 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0 0.86 3.771429 0.94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2265 23.02.01.05.01.07.07S2 T ACCESORIOS PARA PUERTA GLB 0.00% 1.00 20/01/2022 26/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.14 0.628571 0.16 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0 0.86 3.771429 0.94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2266 23.02.01.05.01.07.08S2 T MALLA GALVANIZADA #8 - 2"x2" kg 0.00% 468.00 20/01/2022 26/01/2022 7.00 7.00 66.86 468.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 66.857 66.9 15.64742 0.14 66.857 66.857 66.857 66.857 66.857 66.857 0 401 93.8845 0.85 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2267 23.02.01.05.01.07.09S2 T SUMINISTRO, INSTALACION DE ALAMBRE DE PUAS N° 14 m 0.00% 38.00 20/01/2022 26/01/2022 7.00 7.00 5.43 38.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.4286 5.43 0.435871 0.15 5.4286 5.4286 5.4286 5.4286 5.4286 5.4286 0 32.6 2.615224 0.87 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2268 23.02.01.05.01.08 S2 T INSTALACIÓN DE ACERO ESTRUCTURAL PERNOS DE ANCLAJE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2269 23.02.01.05.01.08.01S2 T ACERO ESTRUCTURAL PERNOS DE ANCLAJE Ø=5/8" kg 0.00% 17.00 20/01/2022 24/01/2022 5.00 5.00 3.40 17.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.4 3.4 0.595 0.2 3.4 3.4 3.4 3.4 0 0 0 13.6 2.38 0.79 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2270 23.02.01.05.02 S2 T INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2271 23.02.01.05.02.01 S2 T INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y kg 0.00% 121.00 20/01/2022 24/01/2022 5.00 5.00 24.20 121.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24.2 24.2 2.143701 0.19 24.2 24.2 24.2 24.2 0 0 0 96.8 8.574803 0.78 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2272 23.02.01.05.03 S2 T PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2273 23.02.01.05.03.01 S2 T PINTURA DE ELEMENTOS METALICOS m2 60.00% 37.60 20/01/2022 26/01/2022 7.00 7.00 5.37 37.60 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.3714 5.37 2.35 0.06 5.3714 5.3714 5.3714 5.3714 5.3714 5.3714 0 32.2 14.1 0.34 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2274 23.02.02 S2 T DISCIPLINA: INSTALACIONES SANITARIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2275 23.02.02.01 S2 T TUBERIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2276 23.02.02.01.01 S2 T MONTANTE DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2277 23.02.02.01.01.01 S2 T 975-SD-4"-P0E03U-100036 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2278 23.02.02.01.01.01.01S2 T Pipe, PVC-D3034, Bell, SDR 35, ø4" m 0.00% 6.00 25/01/2022 25/01/2022 1.00 1.00 6.00 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 6 9.12 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2279 23.02.02.01.01.01.02S2 T El, 90Deg, Bell. Bell, PVC-D3034, ø4" und 0.00% 1.00 25/01/2022 25/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 1 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2280 23.02.03.02 S2 T MECÁNICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2281 23.02.03.02.01 S2 T CANALETAS DE AGUAS DE LLUVIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2282 23.02.03.02.01.01 S2 T ACERO ESTRUCTURAL PLATINA 1/4"x1" kg 0.00% 21.00 26/01/2022 26/01/2022 1.00 1.00 21.00 21.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21 0 21 2.684659 0.89 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2283 23.02.03.02.01.02 S2 T ACERO ESTRUCTURAL PLANCHA FIERRO GALVANIZADO E=0.8 MM kg 0.00% 162.00 26/01/2022 26/01/2022 1.00 1.00 162.00 162.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 162 0 162 14.35039 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2284 23.02.03.02.02 S2 T SOPORTERIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2285 23.02.03.02.02.01 S2 T GS1-4", Tubería 975-SD-4"-P0E03U-100036 pza 0.00% 2.00 26/01/2022 27/01/2022 2.00 2.00 1.00 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 2 6 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2286 23.02.03 S2 T DISCIPLINA: INSTALACIONES ELÉCTRICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2287 23.02.03.01 S2 T SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2288 23.02.03.01.01 S2 T ARTEFACTO DE ALUMBRADO LITHONIA LIGHTING FEM L48 8000LM LPP pto 0.00% 4.00 28/01/2022 03/02/2022 7.00 7.00 0.57 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5714 0.5714 0.5714 0.5714 0.5714 0.5714 0.5714 4 29.12 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2289 23.02.03.01.02 S2 T SUMINISTRO Y MONTAJE DE INTERRUPTOR SIMPLE LEVINTON 1286W pto 0.00% 1.00 28/01/2022 03/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 1.76 0.88 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2290 23.02.03.01.03 S2 T SUMINISTRO E INSTALACIÓN DE RECEPTÁCULO 975-WRL-740 TIPO pto 0.00% 1.00 28/01/2022 03/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 3.6666 0.92 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2291 23.02.03.02 S2 T TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2292 23.02.03.02.01 S2 T SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO AUTOSOPORTADO und 0.00% 1.00 28/01/2022 03/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 55 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2293 23.02.03.02.02 S2 T SUMINISTRO Y MONTAJE DE TABLERO ELÉCTRICO 975-LPA-1243 UND 0.00% 1.00 28/01/2022 03/02/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 1 73.6 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2294 23.02.03.03 S2 T CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2295 23.02.03.03.01 S2 T SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 6.00 28/01/2022 03/02/2022 7.00 7.00 0.86 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.8571 0.8571 0.8571 0.8571 0.8571 0.8571 0.8571 6 3.408 1.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2296 23.02.03.03.02 S2 T SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 50.00 28/01/2022 03/02/2022 7.00 7.00 7.14 50.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.1429 7.1429 7.1429 7.1429 7.1429 7.1429 7.1429 50 48 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2297 23.02.03.03.03 S2 T SUMINISTRO E INSTALACION DE TUBERIA RGS 3/4"Ø M 0.00% 17.00 28/01/2022 03/02/2022 7.00 7.00 2.43 17.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.4286 2.4286 2.4286 2.4286 2.4286 2.4286 2.4286 17 11.1843 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2298 23.02.03.03.04 S2 T SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 3.00 28/01/2022 03/02/2022 7.00 7.00 0.43 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 3 3.648 0.91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2299 23.02.03.03.05 S2 T SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 3"Ø m 0.00% 17.00 28/01/2022 03/02/2022 7.00 7.00 2.43 17.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.4286 2.4286 2.4286 2.4286 2.4286 2.4286 2.4286 17 25.84 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2300 23.02.03.04 S2 T CONDUCTORES Y CABLES DE ENERGIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2301 23.02.03.04.01 S2 T SUMINISTRO E INSTALACIÓN DE CABLE 2-1/c #12 AWG + GRD; XHHW-2, M 0.00% 22.00 25/01/2022 31/01/2022 7.00 7.00 3.14 22.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.1429 3.1429 3.1429 9.43 2.721086 0.45 3.1429 3.1429 3.1429 3.1429 0 0 0 12.6 3.6281143 0.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2302 23.02.03.04.02 S2 T SUMINISTRO E INSTALACIÓN DE CABLE 3-1/c #250 Kcmil + GRD; XHHW-2 m 0.00% 48.00 25/01/2022 31/01/2022 7.00 7.00 6.86 48.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.8571 6.8571 6.8571 20.6 7.072457 0.42 6.8571 6.8571 6.8571 6.8571 0 0 0 27.4 9.4299429 0.55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2303 23.02.03.04.03 S2 T SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #4 AWG, XHHW-2, 0.6Kv m 0.00% 12.00 25/01/2022 31/01/2022 7.00 7.00 1.71 12.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.7143 1.7143 1.7143 5.14 1.222971 0.41 1.7143 1.7143 1.7143 1.7143 0 0 0 6.86 1.6306286 0.54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2304 23.02.03.04.04 S2 T SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #10 AWG + GRD; XHHW-2, m 0.00% 76.00 25/01/2022 31/01/2022 7.00 7.00 10.86 76.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10.857 10.857 10.857 32.6 7.905086 0.44 10.857 10.857 10.857 10.857 0 0 0 43.4 10.540114 0.59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2305 23.02.03.05 S2 T EQUIPOS ELÉCTRICOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2306 23.02.03.05.01 S2 T SUMINISTRO E INSTALACIÓN PARARRAYOS IONIZANTE NO RADIACT und 0.00% 2.00 13/01/2022 19/01/2022 7.00 7.00 0.29 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2857 0.2857 2.24 0.14 0.2857 0.2857 0.2857 0.2857 0.2857 0.2857 0 1.71 13.44 0.84 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2307 23.02.03.05.02 S2 T SUMINISTRO E INSTALACIÓN DE TRANSFORMADOR DE 200KVA 975-XF und 0.00% 1.00 13/01/2022 19/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 7.42857143 0.14 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0 0.86 44.57143 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2308 23.02.03.05.03 S2 T SUMINISTRO Y MONTAJE DE SUBESTACIÓN TIPO SKID 600KVA,23/0.48/ und 0.00% 1.00 06/01/2022 12/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.14 47.142857 0.14 0.1429 0.1429 0.1429 0.1429 0.1429 0.1429 0 0.8571 282.857143 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2309 23.02.03.06 S2 T ESTUDIO DE CORDINACIÓN PARA PROTECCIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2310 23.02.03.06.01 S2 T ESTUDIO DE CORDINACIÓN DE PROTECCIONES PARA INSTALACIÓN D und 0.00% 1.00 21/01/2022 22/01/2022 2.00 2.00 0.50 1.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0.5 0.5 0 0 0 0 0 1 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2311 23.03 S5 RDBT RED DE DISTRIBUCIÓN DE BAJA TENSIÓN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2330 23.03.02 S5 RDBT DISCIPLINA: INSTALACIONES ELÉCTRICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2331 23.03.02.01 S5 RDBT CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2332 23.03.02.01.01 S5 RDBT SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 65.85% 15.71 20/12/2021 27/01/2022 21.00 39.00 0.75 15.71 X X 0 0 0 0.4028 0.4028 0.4028 0.4028 1.61 0.92 0.04 0.4028 0.4028 0.4028 0.4028 0.4028 0.4028 0.4028 2.82 1.6016144 0.06 0.4028 0.4028 0.4028 0.4028 0.4028 0.4028 0.4028 2.82 1.6016144 0.06 0.4028 0.4028 0.4028 0.4028 0.4028 0.4028 0.4028 2.8197 1.60161436 0.06 0.4028 0.4028 0.4028 0.4028 0.4028 0.4028 0.4028 2.82 1.601614 0.06 0.4028 0.4028 0.4028 0.4028 0.4028 0.4028 0.4028 2.82 1.601614 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2333 23.03.02.01.02 S5 RDBT SUMINISTRO E INSTALACIÓN DE TUBERIA PVC SCH40 Ø3" m 65.89% 4.43 20/12/2021 27/01/2022 21.00 39.00 0.21 4.43 X X 0 0 0 0.1136 0.1136 0.1136 0.1136 0.45 0.42 0.04 0.1136 0.1136 0.1136 0.1136 0.1136 0.1136 0.1136 0.8 0.7394692 0.06 0.1136 0.1136 0.1136 0.1136 0.1136 0.1136 0.1136 0.8 0.7394692 0.06 0.1136 0.1136 0.1136 0.1136 0.1136 0.1136 0.1136 0.7951 0.73946923 0.06 0.1136 0.1136 0.1136 0.1136 0.1136 0.1136 0.1136 0.8 0.739469 0.06 0.1136 0.1136 0.1136 0.1136 0.1136 0.1136 0.1136 0.8 0.739469 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2334 23.03.02.01.03 S5 RDBT SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø4" m 65.92% 11.93 20/12/2021 27/01/2022 21.00 39.00 0.57 11.93 X X 0 0 0 0.3059 0.3059 0.3059 0.3059 1.22 1.52 0.04 0.3059 0.3059 0.3059 0.3059 0.3059 0.3059 0.3059 2.14 2.6551897 0.06 0.3059 0.3059 0.3059 0.3059 0.3059 0.3059 0.3059 2.14 2.6551897 0.06 0.3059 0.3059 0.3059 0.3059 0.3059 0.3059 0.3059 2.1413 2.65518974 0.06 0.3059 0.3059 0.3059 0.3059 0.3059 0.3059 0.3059 2.14 2.65519 0.06 0.3059 0.3059 0.3059 0.3059 0.3059 0.3059 0.3059 2.14 2.65519 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2335 23.03.02.01.04 S5 RDBT SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø4" m 73.03% 53.41 20/12/2021 27/01/2022 21.00 39.00 2.54 53.41 X X 0 0 0 1.3695 1.3695 1.3695 1.3695 5.48 8.05 0.03 1.3695 1.3695 1.3695 1.3695 1.3695 1.3695 1.3695 9.59 14.092023 0.05 1.3695 1.3695 1.3695 1.3695 1.3695 1.3695 1.3695 9.59 14.092023 0.05 1.3695 1.3695 1.3695 1.3695 1.3695 1.3695 1.3695 9.5864 14.0920231 0.05 1.3695 1.3695 1.3695 1.3695 1.3695 1.3695 1.3695 9.59 14.09202 0.05 1.3695 1.3695 1.3695 1.3695 1.3695 1.3695 1.3695 9.59 14.09202 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2336 23.03.02.01.05 S5 RDBT SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø6" m 83.28% 13.71 20/12/2021 27/01/2022 21.00 39.00 0.65 13.71 X X 0 0 0 0.3515 0.3515 0.3515 0.3515 1.41 2.76 0.02 0.3515 0.3515 0.3515 0.3515 0.3515 0.3515 0.3515 2.46 4.8231077 0.03 0.3515 0.3515 0.3515 0.3515 0.3515 0.3515 0.3515 2.46 4.8231077 0.03 0.3515 0.3515 0.3515 0.3515 0.3515 0.3515 0.3515 2.4608 4.82310769 0.03 0.3515 0.3515 0.3515 0.3515 0.3515 0.3515 0.3515 2.46 4.823108 0.03 0.3515 0.3515 0.3515 0.3515 0.3515 0.3515 0.3515 2.46 4.823108 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2337 23.03.02.01.06 S5 RDBT SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 65.76% 265.35 20/12/2021 27/01/2022 21.00 39.00 12.64 265.35 X X 0 0 0 6.8038 6.8038 6.8038 6.8038 27.2 26.13 0.04 6.8038 6.8038 6.8038 6.8038 6.8038 6.8038 6.8038 47.6 45.721846 0.06 6.8038 6.8038 6.8038 6.8038 6.8038 6.8038 6.8038 47.6 45.721846 0.06 6.8038 6.8038 6.8038 6.8038 6.8038 6.8038 6.8038 47.627 45.7218462 0.06 6.8038 6.8038 6.8038 6.8038 6.8038 6.8038 6.8038 47.6 45.72185 0.06 6.8038 6.8038 6.8038 6.8038 6.8038 6.8038 6.8038 47.6 45.72185 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2338 23.03.02.01.07 S5 RDBT SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 65.74% 187.38 20/12/2021 27/01/2022 21.00 39.00 8.92 187.38 X X 0 0 0 4.8046 4.8046 4.8046 4.8046 19.2 15.37 0.04 4.8046 4.8046 4.8046 4.8046 4.8046 4.8046 4.8046 33.6 26.902483 0.06 4.8046 4.8046 4.8046 4.8046 4.8046 4.8046 4.8046 33.6 26.902483 0.06 4.8046 4.8046 4.8046 4.8046 4.8046 4.8046 4.8046 33.632 26.9024829 0.06 4.8046 4.8046 4.8046 4.8046 4.8046 4.8046 4.8046 33.6 26.90248 0.06 4.8046 4.8046 4.8046 4.8046 4.8046 4.8046 4.8046 33.6 26.90248 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2339 23.03.02.01.08 S5 RDBT SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 3"Ø m 66.00% 4.76 20/12/2021 27/01/2022 21.00 39.00 0.23 4.76 X X 0 0 0 0.1221 0.1221 0.1221 0.1221 0.49 0.74 0.04 0.1221 0.1221 0.1221 0.1221 0.1221 0.1221 0.1221 0.85 1.2986256 0.06 0.1221 0.1221 0.1221 0.1221 0.1221 0.1221 0.1221 0.85 1.2986256 0.06 0.1221 0.1221 0.1221 0.1221 0.1221 0.1221 0.1221 0.8544 1.29862564 0.06 0.1221 0.1221 0.1221 0.1221 0.1221 0.1221 0.1221 0.85 1.298626 0.06 0.1221 0.1221 0.1221 0.1221 0.1221 0.1221 0.1221 0.85 1.298626 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2340 23.03.02.01.09 S5 RDBT SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 1"Ø m 66.73% 2.99 20/12/2021 27/01/2022 21.00 39.00 0.14 2.99 X X 0 0 0 0.0767 0.0767 0.0767 0.0767 0.31 0.25 0.04 0.0767 0.0767 0.0767 0.0767 0.0767 0.0767 0.0767 0.54 0.4411937 0.06 0.0767 0.0767 0.0767 0.0767 0.0767 0.0767 0.0767 0.54 0.4411937 0.06 0.0767 0.0767 0.0767 0.0767 0.0767 0.0767 0.0767 0.5367 0.44119367 0.06 0.0767 0.0767 0.0767 0.0767 0.0767 0.0767 0.0767 0.54 0.441194 0.06 0.0767 0.0767 0.0767 0.0767 0.0767 0.0767 0.0767 0.54 0.441194 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2341 23.03.02.01.10 S5 RDBT SUMINISTRO E INSTALACIÓN DE TUBERIA RGS 4"Ø m 66.01% 2.04 20/12/2021 27/01/2022 21.00 39.00 0.10 2.04 X X 0 0 0 0.0523 0.0523 0.0523 0.0523 0.21 0.32 0.04 0.0523 0.0523 0.0523 0.0523 0.0523 0.0523 0.0523 0.37 0.5565538 0.06 0.0523 0.0523 0.0523 0.0523 0.0523 0.0523 0.0523 0.37 0.5565538 0.06 0.0523 0.0523 0.0523 0.0523 0.0523 0.0523 0.0523 0.3662 0.55655385 0.06 0.0523 0.0523 0.0523 0.0523 0.0523 0.0523 0.0523 0.37 0.556554 0.06 0.0523 0.0523 0.0523 0.0523 0.0523 0.0523 0.0523 0.37 0.556554 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2342 23.03.02.01.11 S5 RDBT SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 64.85% 2.46 20/12/2021 27/01/2022 21.00 39.00 0.12 2.46 X X 0 0 0 0.0631 0.0631 0.0631 0.0631 0.25 0.31 0.03 0.0631 0.0631 0.0631 0.0631 0.0631 0.0631 0.0631 0.44 0.5369108 0.06 0.0631 0.0631 0.0631 0.0631 0.0631 0.0631 0.0631 0.44 0.5369108 0.06 0.0631 0.0631 0.0631 0.0631 0.0631 0.0631 0.0631 0.4415 0.53691077 0.06 0.0631 0.0631 0.0631 0.0631 0.0631 0.0631 0.0631 0.44 0.536911 0.06 0.0631 0.0631 0.0631 0.0631 0.0631 0.0631 0.0631 0.44 0.536911 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2343 23.03.02.02 S5 RDBT CONDUCTORES Y CABLES DE ENERGIA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2344 23.03.02.02.01 S5 RDBT SUMINISTRO E INSTALACIÓN DE CABLE 4-1/c #350 Kcmil + GRD; XHHW-2 m 4.35% 191.30 22/12/2021 29/01/2022 28.00 39.00 6.83 191.30 X X 0 0 0 0 0 4.9051 4.9051 9.81 3.14 0.05 4.9051 4.9051 4.9051 4.9051 4.9051 4.9051 4.9051 34.3 10.987487 0.17 4.9051 4.9051 4.9051 4.9051 4.9051 4.9051 4.9051 34.3 10.987487 0.17 4.9051 4.9051 4.9051 4.9051 4.9051 4.9051 4.9051 34.336 10.9874872 0.17 4.9051 4.9051 4.9051 4.9051 4.9051 4.9051 4.9051 34.3 10.98749 0.17 4.9051 4.9051 4.9051 4.9051 4.9051 4.9051 4.9051 34.3 10.98749 0.17 4.9051 4.9051 0 0 0 0 0 9.81 3.1392821 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2345 23.03.02.02.02 S5 RDBT SUMINISTRO E INSTALACIÓN DE CABLE 4-1/c #2 AWG + GRD; XHHW-2, 0 m 4.35% 179.83 22/12/2021 29/01/2022 28.00 39.00 6.42 179.83 X X 0 0 0 0 0 4.611 4.611 9.22 2.95 0.05 4.611 4.611 4.611 4.611 4.611 4.611 4.611 32.3 10.328697 0.17 4.611 4.611 4.611 4.611 4.611 4.611 4.611 32.3 10.328697 0.17 4.611 4.611 4.611 4.611 4.611 4.611 4.611 32.277 10.3286974 0.17 4.611 4.611 4.611 4.611 4.611 4.611 4.611 32.3 10.3287 0.17 4.611 4.611 4.611 4.611 4.611 4.611 4.611 32.3 10.3287 0.17 4.611 4.611 0 0 0 0 0 9.22 2.9510564 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2346 23.03.02.02.03 S5 RDBT SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #4 AWG + GRD; XHHW-2, 0 m 4.35% 547.13 22/12/2021 29/01/2022 28.00 39.00 19.54 547.13 X X 0 0 0 0 0 14.029 14.029 28.1 6.67 0.05 14.029 14.029 14.029 14.029 14.029 14.029 14.029 98.2 23.352631 0.17 14.029 14.0
2352 23.03.02.02.09 S5 RDBT PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 4.35% 0.96 22/12/2021 29/01/2022 28.00 39.00 0.03 0.96 X X 0 0 0 0 0 0.0246 0.0246 0.05 10.04 0.05 0.0246 0.0246 0.0246 0.0246 0.0246 0.0246 0.0246 0.17 35.150769 0.17 0.0246 0.0246 0.0246 0.0246 0.0246 0.0246 0.0246 0.17 35.150769 0.17 0.0246 0.0246 0.0246 0.0246 0.0246 0.0246 0.0246 0.1723 35.1507692 0.17 0.0246 0.0246 0.0246 0.0246 0.0246 0.0246 0.0246 0.17 35.15077 0.17 0.0246 0.0246 0.0246 0.0246 0.0246 0.0246 0.0246 0.17 35.15077 0.17 0.0246 0.0246 0 0 0 0 0 0.05 10.043077 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.1 23.03 S5 RDBT BANCODUCTO SECCIÓN G 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.2 23.03.01 S5 RDBT DISCIPLINA: CIVIL 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.3 23.03.01.01 S5 RDBT MOVIMIENTO DE TIERRAS EN ACOMETIDA ELÉCTRICA Y EN REDES DE DISTRIBUCIÓN EN BAJA 0.15 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.4 23.03.01.01.01 S5 RDBT EXCAVACION MASIVA CON EQUIPO m3 78.03% 0.15 22.50 01/01/2022 10/01/2022 10.00 10.00 2.25 22.50 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 2.25 2.25 2.25 2.25 2.25 2.25 13.5 19.607143 0.13 2.25 2.25 2.25 2.25 0 0 0 9 13.0714286 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.5 23.03.01.01.02 S5 RDBT REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 74.85% 0.15 213.50 01/01/2022 10/01/2022 10.00 10.00 21.35 213.50 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 21.35 21.35 21.35 21.35 21.35 21.35 128 16.33275 0.15 21.35 21.35 21.35 21.35 0 0 0 85.4 10.8885 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.6 23.03.01.01.03 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 81.99% 0.15 14.19 01/01/2022 10/01/2022 10.00 10.00 1.42 14.19 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 1.419 1.419 1.419 1.419 1.419 1.419 8.51 1.31967 0.11 1.419 1.419 1.419 1.419 0 0 0 5.676 0.87978 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.7 23.03.01.01.04 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 81.99% 0.15 82.31 01/01/2022 10/01/2022 10.00 10.00 8.23 82.31 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 8.231 8.231 8.231 8.231 8.231 8.231 49.4 1.81082 0.11 8.231 8.231 8.231 8.231 0 0 0 32.924 1.20721333 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.8 23.03.01.01.05 S5 RDBT RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 75.01% 0.15 19.70 01/01/2022 10/01/2022 10.00 10.00 1.97 19.70 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 1.97 1.97 1.97 1.97 1.97 1.97 11.8 20.9805 0.15 1.97 1.97 1.97 1.97 0 0 0 7.88 13.987 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.9 23.03.01.01.06 S5 RDBT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 69.87% 0.15 12.79 01/01/2022 10/01/2022 10.00 10.00 1.28 12.79 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 1.279 1.279 1.279 1.279 1.279 1.279 7.67 15.53985 0.18 1.279 1.279 1.279 1.279 0 0 0 5.116 10.3599 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.10 23.03.01.01.07 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 77.55% 0.15 23.00 01/01/2022 10/01/2022 10.00 28.00 28.00 23.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 2.3 2.3 2.3 2.3 2.3 2.3 13.8 1.58424 0.13 2.3 2.3 2.3 2.3 0 0 0 9.2 1.05616 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.11 23.03.01.01.08 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 77.55% 0.15 68.99 01/01/2022 10/01/2022 10.00 10.00 6.90 68.99 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 6.899 6.899 6.899 6.899 6.899 6.899 41.4 1.9330998 0.14 6.899 6.899 6.899 6.899 0 0 0 27.596 1.2887332 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.12 23.03.01.01.09 S5 RDBT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 77.55% 0.15 23.00 01/01/2022 10/01/2022 10.00 10.00 2.30 23.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 2.3 2.3 2.3 2.3 2.3 2.3 13.8 3.24024 0.14 2.3 2.3 2.3 2.3 0 0 0 9.2 2.16016 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.13 16.01.02 S5 RDBT CONCRETO SIMPLE 0.45 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.14 23.03.01.02.01 S5 RDBT CONCRETO ARMADO EN BANCO DE DUCTOS 0.45 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.15 23.03.01.02.01.01 S5 RDBT SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 43.12% 0.45 35.83 04/01/2022 21/01/2022 18.00 18.00 1.99 35.83 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.9906 1.9906 1.9906 5.97 0.6966944 0.1 1.9906 1.9906 1.9906 1.9906 1.9906 1.9906 1.9906 13.934 1.62562037 0.23 1.9906 1.9906 1.9906 1.9906 1.9906 1.9906 1.9906 13.9 1.62562 0.23 1.9906 0 0 0 0 0 0 1.99 0.232231 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.16 23.03.01.02.01.02 S5 RDBT ENCOFRADO CARAVISTA Y DESENCOFRADO m2 38.15% 0.45 41.47 04/01/2022 21/01/2022 18.00 18.00 2.30 41.47 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.3039 2.3039 2.3039 6.91 17.075964 0.1 2.3039 2.3039 2.3039 2.3039 2.3039 2.3039 2.3039 16.127 39.8439152 0.24 2.3039 2.3039 2.3039 2.3039 2.3039 2.3039 2.3039 16.1 39.84392 0.24 2.3039 0 0 0 0 0 0 2.3 5.691988 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.17 23.03.01.02.01.03 S5 RDBT COLOCACIÓN DE CONCRETO F'c=20 MPa CON OCRE m3 32.51% 0.45 18.22 05/01/2022 22/01/2022 18.00 18.00 1.01 18.22 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.0122 1.0122 2.02 17.267296 0.08 1.0122 1.0122 1.0122 1.0122 1.0122 1.0122 1.0122 7.0856 60.4355376 0.26 1.0122 1.0122 1.0122 1.0122 1.0122 1.0122 1.0122 7.09 60.43554 0.26 1.0122 1.0122 0 0 0 0 0 2.02 17.2673 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.18 23.03.01.02.02 S5 RDBT CURADO DE CONCRETO CON ADITIVO 0.45 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.19 23.03.01.02.02.01 S5 RDBT CURADO DE CONCRETO CON ANTISOL m2 16.55% 0.45 97.64 08/01/2022 25/01/2022 18.00 18.00 5.42 97.64 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.4244 5.4244 5.4244 5.4244 5.4244 5.4244 32.547 4.47516667 0.28 5.4244 5.4244 5.4244 5.4244 5.4244 5.4244 5.4244 38 5.221028 0.33 5.4244 5.4244 5.4244 5.4244 5.4244 0 0 27.1 3.729306 0.23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.20 23.03 S5 RDBT BANCODUCTO SECCIÓN H 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.21 23.03.01 S5 RDBT DISCIPLINA: CIVIL 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.22 23.03.01.01 S5 RDBT MOVIMIENTO DE TIERRAS EN ACOMETIDA ELÉCTRICA Y EN REDES DE DISTRIBUCIÓN EN BAJA 0.13 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.23 23.03.01.01.01 S5 RDBT EXCAVACION MASIVA CON EQUIPO m3 78.03% 0.13 19.50 24/12/2021 02/01/2022 10.00 10.00 1.95 19.50 X 0 0 0 0 0 0 0 0 0.00 0 1.95 1.95 1.95 1.95 1.95 1.95 1.95 13.7 19.825 0.15 1.95 1.95 1.95 0 0 0 0 5.85 8.4964286 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.24 23.03.01.01.02 S5 RDBT REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 74.85% 0.13 185.03 24/12/2021 02/01/2022 10.00 10.00 18.50 185.03 X 0 0 0 0 0 0 0 0 0.00 0 18.503 18.503 18.503 18.503 18.503 18.503 18.503 130 16.513928 0.18 18.503 18.503 18.503 0 0 0 0 55.5 7.0773975 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.25 23.03.01.01.03 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 81.99% 0.13 12.30 24/12/2021 02/01/2022 10.00 10.00 1.23 12.30 X 0 0 0 0 0 0 0 0 0.00 0 1.23 1.23 1.23 1.23 1.23 1.23 1.23 8.61 1.33455 0.12 1.23 1.23 1.23 0 0 0 0 3.69 0.57195 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.26 23.03.01.01.04 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 81.99% 0.13 71.33 24/12/2021 02/01/2022 10.00 10.00 7.13 71.33 X 0 0 0 0 0 0 0 0 0.00 0 7.133 7.133 7.133 7.133 7.133 7.133 7.133 49.9 1.8308033 0.12 7.133 7.133 7.133 0 0 0 0 21.4 0.78463 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.27 23.03.01.01.05 S5 RDBT RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 75.01% 0.13 17.07 24/12/2021 02/01/2022 10.00 10.00 1.71 17.07 X 0 0 0 0 0 0 0 0 0.00 0 1.707 1.707 1.707 1.707 1.707 1.707 1.707 11.9 21.209475 0.18 1.707 1.707 1.707 0 0 0 0 5.12 9.089775 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.28 23.03.01.01.06 S5 RDBT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 69.87% 0.13 11.09 24/12/2021 02/01/2022 10.00 10.00 1.11 11.09 X 0 0 0 0 0 0 0 0 0.00 0 1.109 1.109 1.109 1.109 1.109 1.109 1.109 7.76 15.720075 0.21 1.109 1.109 1.109 0 0 0 0 3.33 6.737175 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.29 23.03.01.01.07 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 77.55% 0.13 19.93 24/12/2021 02/01/2022 10.00 28.00 28.00 19.93 X 0 0 0 0 0 0 0 0 0.00 0 1.993 1.993 1.993 1.993 1.993 1.993 1.993 14 1.6015748 0.16 1.993 1.993 1.993 0 0 0 0 5.98 0.6863892 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.30 23.03.01.01.08 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 77.55% 0.13 59.79 24/12/2021 02/01/2022 10.00 10.00 5.98 59.79 X 0 0 0 0 0 0 0 0 0.00 0 5.979 5.979 5.979 5.979 5.979 5.979 5.979 41.9 1.9545351 0.16 5.979 5.979 5.979 0 0 0 0 17.9 0.8376579 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.31 23.03.01.01.09 S5 RDBT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 77.55% 0.13 19.93 24/12/2021 02/01/2022 10.00 10.00 1.99 19.93 X 0 0 0 0 0 0 0 0 0.00 0 1.993 1.993 1.993 1.993 1.993 1.993 1.993 14 3.2756948 0.16 1.993 1.993 1.993 0 0 0 0 5.98 1.4038692 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.32 16.01.02 S5 RDBT CONCRETO SIMPLE 0.41 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.33 23.03.01.02.01 S5 RDBT CONCRETO ARMADO EN BANCO DE DUCTOS 0.41 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.34 23.03.01.02.01.01 S5 RDBT SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 43.12% 0.41 32.65 27/12/2021 13/01/2022 18.00 18.00 1.81 32.65 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 1.8139 1.8139 1.8139 1.8139 7.26 0.8464815 0.12 1.8139 1.8139 1.8139 1.8139 1.8139 1.8139 1.8139 12.7 1.4813426 0.21 1.8139 1.8139 1.8139 1.8139 1.8139 1.8139 1.8139 12.697 1.48134259 0.21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.35 23.03.01.02.01.02 S5 RDBT ENCOFRADO CARAVISTA Y DESENCOFRADO m2 38.15% 0.41 37.79 27/12/2021 13/01/2022 18.00 18.00 2.10 37.79 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 2.0994 2.0994 2.0994 2.0994 8.4 20.74755 0.14 2.0994 2.0994 2.0994 2.0994 2.0994 2.0994 2.0994 14.7 36.308212 0.24 2.0994 2.0994 2.0994 2.0994 2.0994 2.0994 2.0994 14.696 36.3082121 0.24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.36 23.03.01.02.01.03 S5 RDBT COLOCACIÓN DE CONCRETO F'c=20 MPa CON OCRE m3 32.51% 0.41 16.60 28/12/2021 14/01/2022 18.00 18.00 0.92 16.60 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0.9222 0.9222 0.9222 2.77 23.598007 0.11 0.9222 0.9222 0.9222 0.9222 0.9222 0.9222 0.9222 6.46 55.062016 0.26 0.9222 0.9222 0.9222 0.9222 0.9222 0.9222 0.9222 6.4556 55.0620156 0.26 0.9222 0 0 0 0 0 0 0.92 7.866002 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.37 23.03.01.02.02 S5 RDBT CURADO DE CONCRETO CON ADITIVO 0.41 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.38 23.03.01.02.02.01 S5 RDBT CURADO DE CONCRETO CON ANTISOL m2 16.55% 0.41 88.96 31/12/2021 17/01/2022 18.00 18.00 4.94 88.96 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 4.9422 4.9422 4.9422 4.9422 4.9422 4.9422 4.9422 34.6 4.7568889 0.32 4.9422 4.9422 4.9422 4.9422 4.9422 4.9422 4.9422 34.596 4.75688889 0.32 4.9422 4.9422 4.9422 4.9422 0 0 0 19.8 2.718222 0.18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.39 23.03 S5 RDBT BANCODUCTO SECCIÓN I 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.40 23.03.01 S5 RDBT DISCIPLINA: CIVIL 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.41 23.03.01.01 S5 RDBT MOVIMIENTO DE TIERRAS EN ACOMETIDA ELÉCTRICA Y EN REDES DE DISTRIBUCIÓN EN BAJA 0.04 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.42 23.03.01.01.01 S5 RDBT EXCAVACION MASIVA CON EQUIPO m3 78.03% 0.04 6.00 24/12/2021 06/01/2022 14.00 14.00 0.43 6.00 X 0 0 0 0 0 0 0 0 0.00 0 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 3 4.3571429 0.11 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 3 4.3571429 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.43 23.03.01.01.02 S5 RDBT REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 74.85% 0.04 56.93 24/12/2021 06/01/2022 14.00 14.00 4.07 56.93 X 0 0 0 0 0 0 0 0 0.00 0 4.0664 4.0664 4.0664 4.0664 4.0664 4.0664 4.0664 28.5 3.6292875 0.13 4.0664 4.0664 4.0664 4.0664 4.0664 4.0664 4.0664 28.5 3.6292875 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.44 23.03.01.01.03 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 81.99% 0.04 3.78 24/12/2021 06/01/2022 14.00 14.00 0.27 3.78 X 0 0 0 0 0 0 0 0 0.00 0 0.27 0.27 0.27 0.27 0.27 0.27 0.27 1.89 0.29295 0.1 0.27 0.27 0.27 0.27 0.27 0.27 0.27 1.89 0.29295 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.45 23.03.01.01.04 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 81.99% 0.04 21.95 24/12/2021 06/01/2022 14.00 14.00 1.57 21.95 X 0 0 0 0 0 0 0 0 0.00 0 1.5679 1.5679 1.5679 1.5679 1.5679 1.5679 1.5679 11 0.4024167 0.1 1.5679 1.5679 1.5679 1.5679 1.5679 1.5679 1.5679 11 0.4024167 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.46 23.03.01.01.05 S5 RDBT RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 75.01% 0.04 5.25 24/12/2021 06/01/2022 14.00 14.00 0.38 5.25 X 0 0 0 0 0 0 0 0 0.00 0 0.375 0.375 0.375 0.375 0.375 0.375 0.375 2.63 4.659375 0.13 0.375 0.375 0.375 0.375 0.375 0.375 0.375 2.63 4.659375 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.47 23.03.01.01.06 S5 RDBT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 69.87% 0.04 3.41 24/12/2021 06/01/2022 14.00 14.00 0.24 3.41 X 0 0 0 0 0 0 0 0 0.00 0 0.2436 0.2436 0.2436 0.2436 0.2436 0.2436 0.2436 1.71 3.452625 0.15 0.2436 0.2436 0.2436 0.2436 0.2436 0.2436 0.2436 1.71 3.452625 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.48 23.03.01.01.07 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 77.55% 0.04 6.13 24/12/2021 06/01/2022 14.00 28.00 28.00 6.13 X 0 0 0 0 0 0 0 0 0.00 0 0.4379 0.4379 0.4379 0.4379 0.4379 0.4379 0.4379 3.07 0.351862 0.12 0.4379 0.4379 0.4379 0.4379 0.4379 0.4379 0.4379 3.07 0.351862 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.49 23.03.01.01.08 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 77.55% 0.04 18.40 24/12/2021 06/01/2022 14.00 14.00 1.31 18.40 X 0 0 0 0 0 0 0 0 0.00 0 1.3143 1.3143 1.3143 1.3143 1.3143 1.3143 1.3143 9.2 0.42964 0.11 1.3143 1.3143 1.3143 1.3143 1.3143 1.3143 1.3143 9.2 0.42964 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.50 23.03.01.01.09 S5 RDBT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 77.55% 0.04 6.13 24/12/2021 06/01/2022 14.00 14.00 0.44 6.13 X 0 0 0 0 0 0 0 0 0.00 0 0.4379 0.4379 0.4379 0.4379 0.4379 0.4379 0.4379 3.07 0.719662 0.12 0.4379 0.4379 0.4379 0.4379 0.4379 0.4379 0.4379 3.07 0.719662 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.51 16.01.02 S5 RDBT CONCRETO SIMPLE 0.14 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.52 23.03.01.02.01 S5 RDBT CONCRETO ARMADO EN BANCO DE DUCTOS 0.14 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.53 23.03.01.02.01.01 S5 RDBT SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 43.12% 0.14 11.15 27/12/2021 13/01/2022 18.00 18.00 0.62 11.15 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0.6194 0.6194 0.6194 0.6194 2.48 0.2890741 0.14 0.6194 0.6194 0.6194 0.6194 0.6194 0.6194 0.6194 4.34 0.5058796 0.25 0.6194 0.6194 0.6194 0.6194 0.6194 0.6194 0.6194 4.3361 0.50587963 0.25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.54 23.03.01.02.01.02 S5 RDBT ENCOFRADO CARAVISTA Y DESENCOFRADO m2 38.15% 0.14 12.90 27/12/2021 13/01/2022 18.00 18.00 0.72 12.90 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0.7167 0.7167 0.7167 0.7167 2.87 7.0823867 0.14 0.7167 0.7167 0.7167 0.7167 0.7167 0.7167 0.7167 5.02 12.394177 0.24 0.7167 0.7167 0.7167 0.7167 0.7167 0.7167 0.7167 5.0167 12.3941767 0.24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.55 23.03.01.02.01.03 S5 RDBT COLOCACIÓN DE CONCRETO F'c=20 MPa CON OCRE m3 32.51% 0.14 5.67 28/12/2021 14/01/2022 18.00 18.00 0.32 5.67 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0.315 0.315 0.315 0.95 8.060283 0.11 0.315 0.315 0.315 0.315 0.315 0.315 0.315 2.21 18.807327 0.26 0.315 0.315 0.315 0.315 0.315 0.315 0.315 2.205 18.807327 0.26 0.315 0 0 0 0 0 0 0.32 2.686761 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.56 23.03.01.02.02 S5 RDBT CURADO DE CONCRETO CON ADITIVO 0.14 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.57 23.03.01.02.02.01 S5 RDBT CURADO DE CONCRETO CON ANTISOL m2 16.55% 0.14 30.38 31/12/2021 17/01/2022 18.00 18.00 1.69 30.38 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 1.6878 1.6878 1.6878 1.6878 1.6878 1.6878 1.6878 11.8 1.6244861 0.32 1.6878 1.6878 1.6878 1.6878 1.6878 1.6878 1.6878 11.814 1.62448611 0.32 1.6878 1.6878 1.6878 1.6878 0 0 0 6.75 0.928278 0.19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.58 23.03 S5 RDBT BANCODUCTO MÓDULO A 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.59 23.03.01 S5 RDBT DISCIPLINA: CIVIL 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.60 23.03.01.01 S5 RDBT MOVIMIENTO DE TIERRAS EN ACOMETIDA ELÉCTRICA Y EN REDES DE DISTRIBUCIÓN EN BAJA 0.09 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.61 23.03.01.01.01 S5 RDBT EXCAVACION MASIVA CON EQUIPO m3 79.60% 0.09 12.54 17/12/2021 30/12/2021 14.00 14.00 0.90 12.54 X 0.8957 0.8957 0.8957 0.8957 0.8957 0.8957 0.8957 6.27 9.11 0.1 0.8957 0.8957 0.8957 0.8957 0.8957 0.8957 0.8957 6.27 9.1064286 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.62 23.03.01.01.02 S5 RDBT REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 76.64% 0.09 118.95 17/12/2021 30/12/2021 14.00 14.00 8.50 118.95 X 8.4964 8.4964 8.4964 8.4964 8.4964 8.4964 8.4964 59.5 7.58 0.12 8.4964 8.4964 8.4964 8.4964 8.4964 8.4964 8.4964 59.5 7.5830625 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.63 23.03.01.01.03 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 83.28% 0.09 7.91 17/12/2021 30/12/2021 14.00 14.00 0.57 7.91 X 0.565 0.565 0.565 0.565 0.565 0.565 0.565 3.96 0.61 0.09 0.565 0.565 0.565 0.565 0.565 0.565 0.565 3.96 0.613025 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.64 23.03.01.01.04 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 83.28% 0.09 45.86 17/12/2021 30/12/2021 14.00 14.00 3.28 45.86 X 3.2757 3.2757 3.2757 3.2757 3.2757 3.2757 3.2757 22.9 0.84 0.08 3.2757 3.2757 3.2757 3.2757 3.2757 3.2757 3.2757 22.9 0.8407667 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.65 23.03.01.01.05 S5 RDBT RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 76.79% 0.09 10.97 17/12/2021 30/12/2021 14.00 14.00 0.78 10.97 X 0.7836 0.7836 0.7836 0.7836 0.7836 0.7836 0.7836 5.49 9.74 0.12 0.7836 0.7836 0.7836 0.7836 0.7836 0.7836 0.7836 5.49 9.735875 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.66 23.03.01.01.06 S5 RDBT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 72.02% 0.09 7.13 17/12/2021 30/12/2021 14.00 14.00 0.51 7.13 X 0.5093 0.5093 0.5093 0.5093 0.5093 0.5093 0.5093 3.57 7.22 0.14 0.5093 0.5093 0.5093 0.5093 0.5093 0.5093 0.5093 3.57 7.219125 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.67 23.03.01.01.07 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 79.16% 0.09 12.81 17/12/2021 30/12/2021 14.00 28.00 28.00 12.81 X 0.915 0.915 0.915 0.915 0.915 0.915 0.915 6.41 0.74 0.11 0.915 0.915 0.915 0.915 0.915 0.915 0.915 6.41 0.735294 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.68 23.03.01.01.08 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 79.16% 0.09 38.44 17/12/2021 30/12/2021 14.00 14.00 2.75 38.44 X 2.7457 2.7457 2.7457 2.7457 2.7457 2.7457 2.7457 19.2 0.90 0.1 2.7457 2.7457 2.7457 2.7457 2.7457 2.7457 2.7457 19.2 0.897574 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.69 23.03.01.01.09 S5 RDBT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 79.16% 0.09 12.81 17/12/2021 30/12/2021 14.00 14.00 0.92 12.81 X 0.915 0.915 0.915 0.915 0.915 0.915 0.915 6.41 1.50 0.11 0.915 0.915 0.915 0.915 0.915 0.915 0.915 6.41 1.503894 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.70 23.03 S5 RDBT BANCODUCTO SECCIÓN J 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.71 23.03.01 S5 RDBT DISCIPLINA: CIVIL 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.72 23.03.01.01 S5 RDBT MOVIMIENTO DE TIERRAS EN ACOMETIDA ELÉCTRICA Y EN REDES DE DISTRIBUCIÓN EN BAJA 0.09 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.73 23.03.01.01.01 S5 RDBT EXCAVACION MASIVA CON EQUIPO m3 78.03% 0.09 13.50 24/12/2021 02/01/2022 10.00 10.00 1.35 13.50 X 0 0 0 0 0 0 0 0 0.00 0 1.35 1.35 1.35 1.35 1.35 1.35 1.35 9.45 13.725 0.15 1.35 1.35 1.35 0 0 0 0 4.05 5.8821429 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.74 23.03.01.01.02 S5 RDBT REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 74.85% 0.09 128.10 24/12/2021 02/01/2022 10.00 10.00 12.81 128.10 X 0 0 0 0 0 0 0 0 0.00 0 12.81 12.81 12.81 12.81 12.81 12.81 12.81 89.7 11.432925 0.18 12.81 12.81 12.81 0 0 0 0 38.4 4.899825 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.75 23.03.01.01.03 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 81.99% 0.09 8.51 24/12/2021 02/01/2022 10.00 10.00 0.85 8.51 X 0 0 0 0 0 0 0 0 0.00 0 0.851 0.851 0.851 0.851 0.851 0.851 0.851 5.96 0.923335 0.13 0.851 0.851 0.851 0 0 0 0 2.55 0.395715 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.76 23.03.01.01.04 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 81.99% 0.09 49.38 24/12/2021 02/01/2022 10.00 10.00 4.94 49.38 X 0 0 0 0 0 0 0 0 0.00 0 4.938 4.938 4.938 4.938 4.938 4.938 4.938 34.6 1.26742 0.13 4.938 4.938 4.938 0 0 0 0 14.8 0.54318 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.77 23.03.01.01.05 S5 RDBT RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 75.01% 0.09 11.82 24/12/2021 02/01/2022 10.00 10.00 1.18 11.82 X 0 0 0 0 0 0 0 0 0.00 0 1.182 1.182 1.182 1.182 1.182 1.182 1.182 8.27 14.68635 0.17 1.182 1.182 1.182 0 0 0 0 3.55 6.29415 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.78 23.03.01.01.06 S5 RDBT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 69.87% 0.09 7.68 24/12/2021 02/01/2022 10.00 10.00 0.77 7.68 X 0 0 0 0 0 0 0 0 0.00 0 0.768 0.768 0.768 0.768 0.768 0.768 0.768 5.38 10.8864 0.21 0.768 0.768 0.768 0 0 0 0 2.3 4.6656 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.79 23.03.01.01.07 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 77.55% 0.09 13.80 24/12/2021 02/01/2022 10.00 28.00 28.00 13.80 X 0 0 0 0 0 0 0 0 0.00 0 1.38 1.38 1.38 1.38 1.38 1.38 1.38 9.66 1.108968 0.16 1.38 1.38 1.38 0 0 0 0 4.14 0.475272 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.80 23.03.01.01.08 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 77.55% 0.09 41.39 24/12/2021 02/01/2022 10.00 10.00 4.14 41.39 X 0 0 0 0 0 0 0 0 0.00 0 4.139 4.139 4.139 4.139 4.139 4.139 4.139 29 1.3530391 0.15 4.139 4.139 4.139 0 0 0 0 12.4 0.5798739 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.81 23.03.01.01.09 S5 RDBT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 77.55% 0.09 13.80 24/12/2021 02/01/2022 10.00 10.00 1.38 13.80 X 0 0 0 0 0 0 0 0 0.00 0 1.38 1.38 1.38 1.38 1.38 1.38 1.38 9.66 2.268168 0.16 1.38 1.38 1.38 0 0 0 0 4.14 0.972072 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.82 23.03 S5 RDBT BANCODUCTO MÓDULO F 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.83 23.03.01 S5 RDBT DISCIPLINA: CIVIL 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.84 23.03.01.01 S5 RDBT MOVIMIENTO DE TIERRAS EN ACOMETIDA ELÉCTRICA Y EN REDES DE DISTRIBUCIÓN EN BAJA 0.07 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.85 23.03.01.01.01 S5 RDBT EXCAVACION MASIVA CON EQUIPO m3 100.00% 0.07 0.00 17/12/2021 16/12/2021 0.00 0.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.86 23.03.01.01.02 S5 RDBT REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.07 0.00 17/12/2021 16/12/2021 0.00 0.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.87 23.03.01.01.03 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.07 0.00 17/12/2021 16/12/2021 0.00 0.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.88 23.03.01.01.04 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 100.00% 0.07 0.00 17/12/2021 16/12/2021 0.00 0.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.89 23.03.01.01.05 S5 RDBT RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 100.00% 0.07 0.00 17/12/2021 16/12/2021 0.00 0.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.90 23.03.01.01.06 S5 RDBT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 100.00% 0.07 0.00 17/12/2021 16/12/2021 0.00 0.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.91 23.03.01.01.07 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.07 0.00 17/12/2021 16/12/2021 0.00 28.00 28.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.92 23.03.01.01.08 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.07 0.00 17/12/2021 16/12/2021 0.00 0.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.93 23.03.01.01.09 S5 RDBT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.07 0.00 17/12/2021 16/12/2021 0.00 0.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.94 23.03 S5 RDBT BANCODUCTO MÓDULO I 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.95 23.03.01 S5 RDBT DISCIPLINA: CIVIL 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.96 23.03.01.01 S5 RDBT MOVIMIENTO DE TIERRAS EN ACOMETIDA ELÉCTRICA Y EN REDES DE DISTRIBUCIÓN EN BAJA 0.07 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.97 23.03.01.01.01 S5 RDBT EXCAVACION MASIVA CON EQUIPO m3 78.03% 0.07 10.50 24/12/2021 02/01/2022 10.00 10.00 1.05 10.50 X 0 0 0 0 0 0 0 0 0.00 0 1.05 1.05 1.05 1.05 1.05 1.05 1.05 7.35 10.675 0.15 1.05 1.05 1.05 0 0 0 0 3.15 4.575 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.98 23.03.01.01.02 S5 RDBT REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 74.85% 0.07 99.63 24/12/2021 02/01/2022 10.00 10.00 9.96 99.63 X 0 0 0 0 0 0 0 0 0.00 0 9.963 9.963 9.963 9.963 9.963 9.963 9.963 69.7 8.8919775 0.17 9.963 9.963 9.963 0 0 0 0 29.9 3.8108475 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.99 23.03.01.01.03 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 81.99% 0.07 6.62 24/12/2021 02/01/2022 10.00 10.00 0.66 6.62 X 0 0 0 0 0 0 0 0 0.00 0 0.662 0.662 0.662 0.662 0.662 0.662 0.662 4.63 0.71827 0.12 0.662 0.662 0.662 0 0 0 0 1.99 0.30783 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.100 23.03.01.01.04 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 81.99% 0.07 38.41 24/12/2021 02/01/2022 10.00 10.00 3.84 38.41 X 0 0 0 0 0 0 0 0 0.00 0 3.841 3.841 3.841 3.841 3.841 3.841 3.841 26.9 0.9858567 0.12 3.841 3.841 3.841 0 0 0 0 11.5 0.42251 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.101 23.03.01.01.05 S5 RDBT RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 75.01% 0.07 9.19 24/12/2021 02/01/2022 10.00 10.00 0.92 9.19 X 0 0 0 0 0 0 0 0 0.00 0 0.919 0.919 0.919 0.919 0.919 0.919 0.919 6.43 11.418575 0.18 0.919 0.919 0.919 0 0 0 0 2.76 4.893675 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.102 23.03.01.01.06 S5 RDBT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 69.87% 0.07 5.97 24/12/2021 02/01/2022 10.00 10.00 0.60 5.97 X 0 0 0 0 0 0 0 0 0.00 0 0.597 0.597 0.597 0.597 0.597 0.597 0.597 4.18 8.462475 0.21 0.597 0.597 0.597 0 0 0 0 1.79 3.626775 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.103 23.03.01.01.07 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 77.55% 0.07 10.73 24/12/2021 02/01/2022 10.00 28.00 28.00 10.73 X 0 0 0 0 0 0 0 0 0.00 0 1.073 1.073 1.073 1.073 1.073 1.073 1.073 7.51 0.8622628 0.17 1.073 1.073 1.073 0 0 0 0 3.22 0.3695412 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.104 23.03.01.01.08 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 77.55% 0.07 32.19 24/12/2021 02/01/2022 10.00 10.00 3.22 32.19 X 0 0 0 0 0 0 0 0 0.00 0 3.219 3.219 3.219 3.219 3.219 3.219 3.219 22.5 1.0522911 0.15 3.219 3.219 3.219 0 0 0 0 9.66 0.4509819 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.105 23.03.01.01.09 S5 RDBT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 77.55% 0.07 10.73 24/12/2021 02/01/2022 10.00 10.00 1.07 10.73 X 0 0 0 0 0 0 0 0 0.00 0 1.073 1.073 1.073 1.073 1.073 1.073 1.073 7.51 1.7635828 0.16 1.073 1.073 1.073 0 0 0 0 3.22 0.7558212 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.106 23.03 S5 RDBT BANCODUCTO SECCIÓN A 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.107 23.03.01 S5 RDBT DISCIPLINA: CIVIL 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.108 23.03.01.01 S5 RDBT MOVIMIENTO DE TIERRAS EN ACOMETIDA ELÉCTRICA Y EN REDES DE DISTRIBUCIÓN EN BAJA 0.11 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.109 23.03.01.01.01 S5 RDBT EXCAVACION MASIVA CON EQUIPO m3 78.03% 0.11 16.50 15/01/2022 24/01/2022 10.00 10.00 1.65 16.50 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.65 1.65 1.65 1.65 1.65 1.65 9.9 14.37857 0.13 1.65 1.65 1.65 1.65 0 0 0 6.6 9.585714 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.110 23.03.01.01.02 S5 RDBT REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 74.85% 0.11 156.57 15/01/2022 24/01/2022 10.00 10.00 15.66 156.57 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15.657 15.657 15.657 15.657 15.657 15.657 93.9 11.97761 0.15 15.657 15.657 15.657 15.657 0 0 0 62.6 7.98507 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.111 23.03.01.01.03 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 81.99% 0.11 10.41 15/01/2022 24/01/2022 10.00 10.00 1.04 10.41 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.041 1.041 1.041 1.041 1.041 1.041 6.25 0.96813 0.11 1.041 1.041 1.041 1.041 0 0 0 4.16 0.64542 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.112 23.03.01.01.04 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 81.99% 0.11 60.36 15/01/2022 24/01/2022 10.00 10.00 6.04 60.36 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.036 6.036 6.036 6.036 6.036 6.036 36.2 1.32792 0.11 6.036 6.036 6.036 6.036 0 0 0 24.1 0.88528 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.113 23.03.01.01.05 S5 RDBT RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 75.01% 0.11 14.44 15/01/2022 24/01/2022 10.00 10.00 1.44 14.44 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.444 1.444 1.444 1.444 1.444 1.444 8.66 15.3786 0.15 1.444 1.444 1.444 1.444 0 0 0 5.78 10.2524 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.114 23.03.01.01.06 S5 RDBT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 69.87% 0.11 9.38 15/01/2022 24/01/2022 10.00 10.00 0.94 9.38 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.938 0.938 0.938 0.938 0.938 0.938 5.63 11.3967 0.18 0.938 0.938 0.938 0.938 0 0 0 3.75 7.5978 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.115 23.03.01.01.07 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 77.55% 0.11 16.86 15/01/2022 24/01/2022 10.00 28.00 28.00 16.86 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.686 1.686 1.686 1.686 1.686 1.686 10.1 1.161317 0.13 1.686 1.686 1.686 1.686 0 0 0 6.74 0.774211 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.116 23.03.01.01.08 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 77.55% 0.11 50.59 15/01/2022 24/01/2022 10.00 10.00 5.06 50.59 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.059 5.059 5.059 5.059 5.059 5.059 30.4 1.417532 0.13 5.059 5.059 5.059 5.059 0 0 0 20.2 0.945021 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.117 23.03.01.01.09 S5 RDBT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 77.55% 0.11 16.86 15/01/2022 24/01/2022 10.00 10.00 1.69 16.86 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.686 1.686 1.686 1.686 1.686 1.686 10.1 2.375237 0.13 1.686 1.686 1.686 1.686 0 0 0 6.74 1.583491 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.118 23.03 S5 RDBT BANCODUCTO MÓDULO B 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.119 23.03.01 S5 RDBT DISCIPLINA: CIVIL 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.120 23.03.01.01 S5 RDBT MOVIMIENTO DE TIERRAS EN ACOMETIDA ELÉCTRICA Y EN REDES DE DISTRIBUCIÓN EN BAJA 0.09 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.121 23.03.01.01.01 S5 RDBT EXCAVACION MASIVA CON EQUIPO m3 89.02% 0.09 6.75 17/12/2021 23/12/2021 7.00 7.00 0.96 6.75 X 0.9643 0.9643 0.9643 0.9643 0.9643 0.9643 0.9643 6.75 9.80 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.122 23.03.01.01.02 S5 RDBT REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 87.42% 0.09 64.05 17/12/2021 23/12/2021 7.00 7.00 9.15 64.05 X 9.15 9.15 9.15 9.15 9.15 9.15 9.15 64.1 8.17 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.123 23.03.01.01.03 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 90.99% 0.09 4.26 17/12/2021 23/12/2021 7.00 7.00 0.61 4.26 X 0.6086 0.6086 0.6086 0.6086 0.6086 0.6086 0.6086 4.26 0.66 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.124 23.03.01.01.04 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 91.00% 0.09 24.69 17/12/2021 23/12/2021 7.00 7.00 3.53 24.69 X 3.5271 3.5271 3.5271 3.5271 3.5271 3.5271 3.5271 24.7 0.91 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.125 23.03.01.01.05 S5 RDBT RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 87.51% 0.09 5.91 17/12/2021 23/12/2021 7.00 7.00 0.84 5.91 X 0.8443 0.8443 0.8443 0.8443 0.8443 0.8443 0.8443 5.91 10.49 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.126 23.03.01.01.06 S5 RDBT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 84.94% 0.09 3.84 17/12/2021 23/12/2021 7.00 7.00 0.55 3.84 X 0.5486 0.5486 0.5486 0.5486 0.5486 0.5486 0.5486 3.84 7.78 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.127 23.03.01.01.07 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 88.78% 0.09 6.90 17/12/2021 23/12/2021 7.00 28.00 28.00 6.90 X 0.9857 0.9857 0.9857 0.9857 0.9857 0.9857 0.9857 6.9 0.79 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.128 23.03.01.01.08 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 88.78% 0.09 20.70 17/12/2021 23/12/2021 7.00 7.00 2.96 20.70 X 2.9571 2.9571 2.9571 2.9571 2.9571 2.9571 2.9571 20.7 0.97 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.129 23.03.01.01.09 S5 RDBT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 88.78% 0.09 6.90 17/12/2021 23/12/2021 7.00 7.00 0.99 6.90 X 0.9857 0.9857 0.9857 0.9857 0.9857 0.9857 0.9857 6.9 1.62 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.130 23.03 S5 RDBT BANCODUCTO MÓDULO C 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.131 23.03.01 S5 RDBT DISCIPLINA: CIVIL 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.132 23.03.01.01 S5 RDBT MOVIMIENTO DE TIERRAS EN ACOMETIDA ELÉCTRICA Y EN REDES DE DISTRIBUCIÓN EN BAJA 0.04 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.133 23.03.01.01.01 S5 RDBT EXCAVACION MASIVA CON EQUIPO m3 89.02% 0.04 3.00 17/12/2021 23/12/2021 7.00 7.00 0.43 3.00 X 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 3 4.36 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.134 23.03.01.01.02 S5 RDBT REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 87.42% 0.04 28.47 17/12/2021 23/12/2021 7.00 7.00 4.07 28.47 X 4.0671 4.0671 4.0671 4.0671 4.0671 4.0671 4.0671 28.5 3.63 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.135 23.03.01.01.03 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 90.99% 0.04 1.89 17/12/2021 23/12/2021 7.00 7.00 0.27 1.89 X 0.27 0.27 0.27 0.27 0.27 0.27 0.27 1.89 0.29 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.136 23.03.01.01.04 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 91.00% 0.04 10.97 17/12/2021 23/12/2021 7.00 7.00 1.57 10.97 X 1.5671 1.5671 1.5671 1.5671 1.5671 1.5671 1.5671 11 0.40 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.137 23.03.01.01.05 S5 RDBT RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 87.50% 0.04 2.63 17/12/2021 23/12/2021 7.00 7.00 0.38 2.63 X 0.3757 0.3757 0.3757 0.3757 0.3757 0.3757 0.3757 2.63 4.67 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.138 23.03.01.01.06 S5 RDBT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 84.93% 0.04 1.71 17/12/2021 23/12/2021 7.00 7.00 0.24 1.71 X 0.2443 0.2443 0.2443 0.2443 0.2443 0.2443 0.2443 1.71 3.46 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.139 23.03.01.01.07 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 88.77% 0.04 3.07 17/12/2021 23/12/2021 7.00 28.00 28.00 3.07 X 0.4386 0.4386 0.4386 0.4386 0.4386 0.4386 0.4386 3.07 0.35 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.140 23.03.01.01.08 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 88.78% 0.04 9.20 17/12/2021 23/12/2021 7.00 7.00 1.31 9.20 X 1.3143 1.3143 1.3143 1.3143 1.3143 1.3143 1.3143 9.2 0.43 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.141 23.03.01.01.09 S5 RDBT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 88.77% 0.04 3.07 17/12/2021 23/12/2021 7.00 7.00 0.44 3.07 X 0.4386 0.4386 0.4386 0.4386 0.4386 0.4386 0.4386 3.07 0.72 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.142 23.03 S5 RDBT BANCODUCTO MÓDULO OyP 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.143 23.03.01 S5 RDBT DISCIPLINA: CIVIL 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.144 23.03.01.01 S5 RDBT MOVIMIENTO DE TIERRAS EN ACOMETIDA ELÉCTRICA Y EN REDES DE DISTRIBUCIÓN EN BAJA 0.12 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2352.145 23.03.01.01.01 S5 RDBT EXCAVACION MASIVA CON EQUIPO m3 100.00% 0.12 0.00 17/12/2021 06/01/2022 21.00 21.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.146 23.03.01.01.02 S5 RDBT REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.12 0.00 17/12/2021 06/01/2022 21.00 21.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.147 23.03.01.01.03 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.12 0.00 17/12/2021 06/01/2022 21.00 21.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.148 23.03.01.01.04 S5 RDBT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 100.00% 0.12 0.00 17/12/2021 06/01/2022 21.00 21.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.149 23.03.01.01.05 S5 RDBT RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 100.00% 0.12 0.00 17/12/2021 06/01/2022 21.00 21.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.150 23.03.01.01.06 S5 RDBT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 100.00% 0.12 0.00 17/12/2021 06/01/2022 21.00 21.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.151 23.03.01.01.07 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.12 0.00 17/12/2021 06/01/2022 21.00 28.00 28.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.152 23.03.01.01.08 S5 RDBT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.12 0.00 17/12/2021 06/01/2022 21.00 21.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2352.153 23.03.01.01.09 S5 RDBT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.12 0.00 17/12/2021 06/01/2022 21.00 21.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.1 23.04 S5 BBEE BUZÓN 1001 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.2 23.04.01 S5 BBEE DISCIPLINA: CIVIL 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.3 23.04.01.01 S5 BBEE MOVIMIENTO DE TIERRAS EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.4 23.04.01.01.01 S5 BBEE EXCAVACIÓN PARA BUZONES ELÉCTRICOS m3 92.46% 0.1 0.45 31/12/2021 13/01/2022 14.00 14.00 0.03 0.45 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0321 0.0321 0.0321 0.0321 0.0321 0.0321 0.0321 0.23 0.343125 0.04 0.0321 0.0321 0.0321 0.0321 0.0321 0.0321 0.0321 0.225 0.343125 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.5 23.04.01.01.02 S5 BBEE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 92.52% 0.1 1.29 31/12/2021 13/01/2022 14.00 14.00 0.09 1.29 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0921 0.0921 0.0921 0.0921 0.0921 0.0921 0.0921 0.65 0.0822375 0.04 0.0921 0.0921 0.0921 0.0921 0.0921 0.0921 0.0921 0.645 0.0822375 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.6 23.04.01.01.03 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 89.77% 0.1 0.05 31/12/2021 13/01/2022 14.00 14.00 0.00 0.05 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.03 0.003875 ### 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.025 0.003875 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.7 23.04.01.01.04 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 91.58% 0.1 0.23 31/12/2021 13/01/2022 14.00 14.00 0.02 0.23 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0.0164 0.0164 0.0164 0.0164 0.0164 0.0164 0.0164 0.12 0.0042167 ### 0.0164 0.0164 0.0164 0.0164 0.0164 0.0164 0.0164 0.115 0.00421667 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.8 23.04.01.01.05 S5 BBEE FILTRO DE GRAVA 1/2" m3 91.44% 0.1 0.04 31/12/2021 13/01/2022 14.00 14.00 0.00 0.04 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.02 0.0546667 0.05 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.02 0.05466667 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.9 23.04.01.01.06 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 92.96% 0.1 0.52 31/12/2021 13/01/2022 14.00 14.00 0.04 0.52 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0371 0.0371 0.0371 0.0371 0.0371 0.0371 0.0371 0.26 0.029848 0.03 0.0371 0.0371 0.0371 0.0371 0.0371 0.0371 0.0371 0.26 0.029848 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.10 23.04.01.01.07 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 92.41% 0.1 1.12 31/12/2021 13/01/2022 14.00 14.00 0.08 1.12 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.56 0.026152 0.03 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.56 0.026152 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.11 23.04.01.01.08 S5 BBEE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 92.67% 0.1 0.54 31/12/2021 13/01/2022 14.00 14.00 0.04 0.54 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.0386 0.0386 0.0386 0.0386 0.0386 0.0386 0.0386 0.27 0.063396 0.03 0.0386 0.0386 0.0386 0.0386 0.0386 0.0386 0.0386 0.27 0.063396 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.12 19.01.02 S5 BBEE CONCRETO SIMPLE 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.13 23.04.01.02.01 S5 BBEE CONCRETO ARMADO EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.14 23.04.01.02.01.01 S5 BBEE SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 86.52% 0.1 70.08 02/01/2022 22/01/2022 21.00 21.00 3.34 70.08 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 3.3371 3.3371 3.3371 3.3371 3.3371 16.7 1.9466667 0.03 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 23.36 2.72533333 0.04 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 23.4 2.725333 0.04 3.3371 3.3371 0 0 0 0 0 6.67 0.778667 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.15 23.04.01.02.01.02 S5 BBEE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 55.78% 0.1 11.76 02/01/2022 22/01/2022 21.00 21.00 0.56 11.76 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0.56 0.56 0.56 0.56 0.56 2.8 6.91768 0.1 0.56 0.56 0.56 0.56 0.56 0.56 0.56 3.92 9.684752 0.15 0.56 0.56 0.56 0.56 0.56 0.56 0.56 3.92 9.684752 0.15 0.56 0.56 0 0 0 0 0 1.12 2.767072 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.16 23.04.01.02.01.03 S5 BBEE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 55.80% 0.1 1.59 02/01/2022 22/01/2022 21.00 21.00 0.08 1.59 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0757 0.0757 0.0757 0.0757 0.0757 0.38 2.3382464 0.11 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.53 3.273545 0.15 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.53 3.273545 0.15 0.0757 0.0757 0 0 0 0 0 0.15 0.935299 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.17 23.04.01.02.02 S5 BBEE CURADO DE CONCRETO CON ADITIVO 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0
2372.38 23.04.01.02.02.01 S5 BBEE CURADO DE CONCRETO CON ANTISOL m2 25.97% 0.1 21.62 23/12/2021 23/12/2021 1.00 1.00 21.62 21.62 X 0 0 0 0 0 0 21.62 21.6 2.97 0.74 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.39 23.04.01.03 S5 BBEE CARPINTERIA METALICA 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.40 23.04.01.03.01 S5 BBEE SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA F°G° CON PLANCHA und 0.00% 0.1 1.00 26/12/2021 26/12/2021 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 1 0 0 0 0 1 1.5 0.75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.41 23.04 S5 BBEE BUZÓN 1003 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.42 23.04.01 S5 BBEE DISCIPLINA: CIVIL 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.43 23.04.01.01 S5 BBEE MOVIMIENTO DE TIERRAS EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.44 23.04.01.01.01 S5 BBEE EXCAVACIÓN PARA BUZONES ELÉCTRICOS m3 92.46% 0.1 0.45 14/01/2022 27/01/2022 14.00 14.00 0.03 0.45 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0321 0.0321 0.0321 0.0321 0.0321 0.0321 0.0321 0.23 0.343125 0.04 0.0321 0.0321 0.0321 0.0321 0.0321 0.0321 0.0321 0.23 0.343125 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.45 23.04.01.01.02 S5 BBEE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 92.52% 0.1 1.29 14/01/2022 27/01/2022 14.00 14.00 0.09 1.29 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0921 0.0921 0.0921 0.0921 0.0921 0.0921 0.0921 0.65 0.082238 0.04 0.0921 0.0921 0.0921 0.0921 0.0921 0.0921 0.0921 0.65 0.082238 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.46 23.04.01.01.03 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 89.77% 0.1 0.05 14/01/2022 27/01/2022 14.00 14.00 0.00 0.05 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.03 0.003875 ### 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.0036 0.03 0.003875 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.47 23.04.01.01.04 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 91.58% 0.1 0.23 14/01/2022 27/01/2022 14.00 14.00 0.02 0.23 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0.0164 0.0164 0.0164 0.0164 0.0164 0.0164 0.0164 0.12 0.004217 ### 0.0164 0.0164 0.0164 0.0164 0.0164 0.0164 0.0164 0.12 0.004217 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.48 23.04.01.01.05 S5 BBEE FILTRO DE GRAVA 1/2" m3 91.44% 0.1 0.04 14/01/2022 27/01/2022 14.00 14.00 0.00 0.04 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.02 0.054667 0.05 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.02 0.054667 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.49 23.04.01.01.06 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 92.96% 0.1 0.52 14/01/2022 27/01/2022 14.00 14.00 0.04 0.52 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0371 0.0371 0.0371 0.0371 0.0371 0.0371 0.0371 0.26 0.029848 0.03 0.0371 0.0371 0.0371 0.0371 0.0371 0.0371 0.0371 0.26 0.029848 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.50 23.04.01.01.07 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 92.41% 0.1 1.12 14/01/2022 27/01/2022 14.00 14.00 0.08 1.12 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.56 0.026152 0.03 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.56 0.026152 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.51 23.04.01.01.08 S5 BBEE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 92.67% 0.1 0.54 14/01/2022 27/01/2022 14.00 14.00 0.04 0.54 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0386 0.0386 0.0386 0.0386 0.0386 0.0386 0.0386 0.27 0.063396 0.03 0.0386 0.0386 0.0386 0.0386 0.0386 0.0386 0.0386 0.27 0.063396 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.52 19.01.02 S5 BBEE CONCRETO SIMPLE 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.53 23.04.01.02.01 S5 BBEE CONCRETO ARMADO EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.54 23.04.01.02.01.01 S5 BBEE SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 86.52% 0.1 70.08 16/01/2022 05/02/2022 21.00 21.00 3.34 70.08 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.3371 3.3371 3.3371 3.3371 3.3371 16.7 1.946667 0.03 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 23.4 2.725333 0.04 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 23.4 2.7253333 0.04 3.3371 3.3371 0 0 0 0 0 6.670.778667 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.55 23.04.01.02.01.02 S5 BBEE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 55.78% 0.1 11.76 16/01/2022 05/02/2022 21.00 21.00 0.56 11.76 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.56 0.56 0.56 0.56 0.56 2.8 6.91768 0.1 0.56 0.56 0.56 0.56 0.56 0.56 0.56 3.92 9.684752 0.15 0.56 0.56 0.56 0.56 0.56 0.56 0.56 3.92 9.684752 0.15 0.56 0.56 0 0 0 0 0 1.122.767072 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.56 23.04.01.02.01.03 S5 BBEE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 55.80% 0.1 1.59 16/01/2022 05/02/2022 21.00 21.00 0.08 1.59 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0757 0.0757 0.0757 0.0757 0.0757 0.38 2.338246 0.11 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.53 3.273545 0.15 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.53 3.273545 0.15 0.0757 0.0757 0 0 0 0 0 0.150.935299 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.57 23.04.01.02.02 S5 BBEE CURADO DE CONCRETO CON ADITIVO 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.58 23.04.01.02.02.01 S5 BBEE CURADO DE CONCRETO CON ANTISOL m2 25.97% 0.1 21.62 19/01/2022 08/02/2022 21.00 21.00 1.03 21.62 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.0295 1.0295 2.06 0.283119 0.07 1.0295 1.0295 1.0295 1.0295 1.0295 1.0295 1.0295 7.21 0.990917 0.25 1.0295 1.0295 1.0295 1.0295 1.0295 1.0295 1.0295 7.21 0.9909167 0.25 1.0295 1.0295 1.0295 1.0295 1.0295 0 0 5.150.707798 0.18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.59 23.04.01.03 S5 BBEE CARPINTERIA METALICA 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.60 23.04.01.03.01 S5 BBEE SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA F°G° CON PLANCHA und 0.00% 0.1 1.00 22/01/2022 11/02/2022 21.00 21.00 0.05 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.29 0.428571 0.21 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.33 0.5 0.25 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.33 0.5 0.25 0.0476 0 0 0 0 0 0 0.05 0.07143 0.04 0 0 0 0 0 0 0 0 - 0
2372.61 23.04 S5 BBEE BUZÓN 1004 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.62 23.04.01 S5 BBEE DISCIPLINA: CIVIL 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.63 23.04.01.01 S5 BBEE MOVIMIENTO DE TIERRAS EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.64 23.04.01.01.01 S5 BBEE EXCAVACIÓN PARA BUZONES ELÉCTRICOS m3 100.00% 0.1 0.00 03/12/2021 16/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.65 23.04.01.01.02 S5 BBEE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.1 0.00 03/12/2021 16/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.66 23.04.01.01.03 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.1 0.00 03/12/2021 16/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.67 23.04.01.01.04 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 100.00% 0.1 0.00 03/12/2021 16/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.68 23.04.01.01.05 S5 BBEE FILTRO DE GRAVA 1/2" m3 100.00% 0.1 0.00 03/12/2021 16/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.69 23.04.01.01.06 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.1 0.00 03/12/2021 16/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.70 23.04.01.01.07 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.1 0.00 03/12/2021 16/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.71 23.04.01.01.08 S5 BBEE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.1 0.00 03/12/2021 16/12/2021 14.00 14.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.72 19.01.02 S5 BBEE CONCRETO SIMPLE 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.73 23.04.01.02.01 S5 BBEE CONCRETO ARMADO EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.74 23.04.01.02.01.01 S5 BBEE SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 100.00% 0.1 0.00 05/12/2021 25/12/2021 21.00 21.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.75 23.04.01.02.01.02 S5 BBEE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 100.00% 0.1 0.00 05/12/2021 25/12/2021 21.00 21.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.76 23.04.01.02.01.03 S5 BBEE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 100.00% 0.1 0.00 05/12/2021 25/12/2021 21.00 21.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.77 23.04.01.02.02 S5 BBEE CURADO DE CONCRETO CON ADITIVO 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.78 23.04.01.02.02.01 S5 BBEE CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.1 0.00 08/12/2021 28/12/2021 21.00 21.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.79 23.04.01.03 S5 BBEE CARPINTERIA METALICA 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.80 23.04.01.03.01 S5 BBEE SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA F°G° CON PLANCHA und 100.00% 0.1 0.00 11/12/2021 31/12/2021 21.00 21.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.81 23.04 S5 BBEE BUZÓN 1005 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.82 23.04.01 S5 BBEE DISCIPLINA: CIVIL 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.83 23.04.01.01 S5 BBEE MOVIMIENTO DE TIERRAS EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.84 23.04.01.01.01 S5 BBEE EXCAVACIÓN PARA BUZONES ELÉCTRICOS m3 92.46% 0.1 0.45 15/01/2022 21/01/2022 7.00 7.00 0.06 0.45 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0643 0.0643 0.0643 0.0643 0.0643 0.0643 0.39 0.588214 0.07 0.0643 0 0 0 0 0 0 0.06 0.098036 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.85 23.04.01.01.02 S5 BBEE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 92.52% 0.1 1.29 15/01/2022 21/01/2022 7.00 7.00 0.18 1.29 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1843 0.1843 0.1843 0.1843 0.1843 0.1843 1.11 0.140979 0.07 0.1843 0 0 0 0 0 0 0.18 0.023496 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.86 23.04.01.01.03 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 89.77% 0.1 0.05 15/01/2022 21/01/2022 7.00 7.00 0.01 0.05 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0.0071 0.0071 0.0071 0.0071 0.0071 0.0071 0.04 0.006643 ### 0.0071 0 0 0 0 0 0 0.01 0.001107 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.87 23.04.01.01.04 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 91.58% 0.1 0.23 15/01/2022 21/01/2022 7.00 7.00 0.03 0.23 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0.0329 0.0329 0.0329 0.0329 0.0329 0.0329 0.2 0.007229 ### 0.0329 0 0 0 0 0 0 0.03 0.001205 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.88 23.04.01.01.05 S5 BBEE FILTRO DE GRAVA 1/2" m3 91.44% 0.1 0.04 15/01/2022 21/01/2022 7.00 7.00 0.01 0.04 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0057 0.0057 0.0057 0.0057 0.0057 0.0057 0.03 0.093714 0.09 0.0057 0 0 0 0 0 0 0.01 0.015619 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.89 23.04.01.01.06 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 92.96% 0.1 0.52 15/01/2022 21/01/2022 7.00 7.00 0.07 0.52 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0743 0.0743 0.0743 0.0743 0.0743 0.0743 0.45 0.051168 0.05 0.0743 0 0 0 0 0 0 0.07 0.008528 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.90 23.04.01.01.07 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 92.41% 0.1 1.12 15/01/2022 21/01/2022 7.00 7.00 0.16 1.12 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.16 0.16 0.16 0.16 0.16 0.16 0.96 0.044832 0.04 0.16 0 0 0 0 0 0 0.16 0.007472 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.91 23.04.01.01.08 S5 BBEE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 92.67% 0.1 0.54 15/01/2022 21/01/2022 7.00 7.00 0.08 0.54 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0771 0.0771 0.0771 0.0771 0.0771 0.0771 0.46 0.108679 0.05 0.0771 0 0 0 0 0 0 0.08 0.018113 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.92 19.01.02 S5 BBEE CONCRETO SIMPLE 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.93 23.04.01.02.01 S5 BBEE CONCRETO ARMADO EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.94 23.04.01.02.01.01 S5 BBEE SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 86.52% 0.1 70.08 17/01/2022 06/02/2022 21.00 21.00 3.34 70.08 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.3371 3.3371 3.3371 3.3371 13.3 1.557333 0.03 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 23.4 2.725333 0.04 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 23.4 2.7253333 0.04 3.3371 3.3371 3.3371 0 0 0 0 10 1.168 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.95 23.04.01.02.01.02 S5 BBEE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 55.78% 0.1 11.76 17/01/2022 06/02/2022 21.00 21.00 0.56 11.76 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.56 0.56 0.56 0.56 2.24 5.534144 0.08 0.56 0.56 0.56 0.56 0.56 0.56 0.56 3.92 9.684752 0.15 0.56 0.56 0.56 0.56 0.56 0.56 0.56 3.92 9.684752 0.15 0.56 0.56 0.56 0 0 0 0 1.684.150608 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.96 23.04.01.02.01.03 S5 BBEE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 55.80% 0.1 1.59 17/01/2022 06/02/2022 21.00 21.00 0.08 1.59 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0757 0.0757 0.0757 0.0757 0.3 1.870597 0.09 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.53 3.273545 0.15 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.53 3.273545 0.15 0.0757 0.0757 0.0757 0 0 0 0 0.231.402948 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.97 23.04.01.02.02 S5 BBEE CURADO DE CONCRETO CON ADITIVO 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.98 23.04.01.02.02.01 S5 BBEE CURADO DE CONCRETO CON ANTISOL m2 25.97% 0.1 21.62 20/01/2022 09/02/2022 21.00 21.00 1.03 21.62 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.0295 1.03 0.14156 0.04 1.0295 1.0295 1.0295 1.0295 1.0295 1.0295 1.0295 7.21 0.990917 0.25 1.0295 1.0295 1.0295 1.0295 1.0295 1.0295 1.0295 7.21 0.9909167 0.25 1.0295 1.0295 1.0295 1.0295 1.0295 1.0295 0 6.180.849357 0.21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.99 23.04.01.03 S5 BBEE CARPINTERIA METALICA 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.100 23.04.01.03.01 S5 BBEE SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA F°G° CON PLANCHA und 0.00% 0.1 1.00 23/01/2022 12/02/2022 21.00 21.00 0.05 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0476 0.0476 0.0476 0.0476 0.0476 0.24 0.357143 0.18 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.33 0.5 0.25 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.33 0.5 0.25 0.0476 0.0476 0 0 0 0 0 0.1 0.14286 0.07 0 0 0 0 0 0 0 0 - 0
2372.101 23.04 S5 BBEE BUZÓN 1006 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.102 23.04.01 S5 BBEE DISCIPLINA: CIVIL 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.103 23.04.01.01 S5 BBEE MOVIMIENTO DE TIERRAS EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.104 23.04.01.01.01 S5 BBEE EXCAVACIÓN PARA BUZONES ELÉCTRICOS m3 100.00% 0.1 0.00 17/12/2021 19/12/2021 3.00 3.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.105 23.04.01.01.02 S5 BBEE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.1 0.00 17/12/2021 19/12/2021 3.00 3.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.106 23.04.01.01.03 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 99.77% 0.1 0.00 17/12/2021 19/12/2021 3.00 3.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.107 23.04.01.01.04 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 100.00% 0.1 0.00 17/12/2021 19/12/2021 3.00 3.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.108 23.04.01.01.05 S5 BBEE FILTRO DE GRAVA 1/2" m3 99.44% 0.1 0.00 17/12/2021 19/12/2021 3.00 3.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.109 23.04.01.01.06 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 99.99% 0.1 0.00 17/12/2021 19/12/2021 3.00 3.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.110 23.04.01.01.07 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 99.97% 0.1 0.00 17/12/2021 19/12/2021 3.00 3.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.111 23.04.01.01.08 S5 BBEE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 99.96% 0.1 0.00 17/12/2021 19/12/2021 3.00 3.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.112 19.01.02 S5 BBEE CONCRETO SIMPLE 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.113 23.04.01.02.01 S5 BBEE CONCRETO ARMADO EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.114 23.04.01.02.01.01 S5 BBEE SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 89.73% 0.1 53.39 19/12/2021 20/12/2021 2.00 2.00 26.70 53.39 X 0 0 26.695 26.695 0 0 0 53.4 6.23 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.115 23.04.01.02.01.02 S5 BBEE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 66.30% 0.1 8.96 21/12/2021 21/12/2021 1.00 1.00 8.96 8.96 X 0 0 0 0 8.96 0 0 8.96 22.14 0.34 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.116 23.04.01.02.01.03 S5 BBEE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 55.80% 0.1 1.59 22/12/2021 22/12/2021 1.00 1.00 1.59 1.59 X 0 0 0 0 0 1.59 0 1.59 9.82 0.45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.117 23.04.01.02.02 S5 BBEE CURADO DE CONCRETO CON ADITIVO 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.118 23.04.01.02.02.01 S5 BBEE CURADO DE CONCRETO CON ANTISOL m2 25.97% 0.1 21.62 25/12/2021 27/12/2021 3.00 3.00 7.21 21.62 X 0 0 0 0 0 0 0 0 0.00 0 0 7.2067 7.2067 7.2067 0 0 0 21.6 2.97275 0.74 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.119 23.04.01.03 S5 BBEE CARPINTERIA METALICA 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.120 23.04.01.03.01 S5 BBEE SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA F°G° CON PLANCHA und 0.00% 0.1 1.00 28/12/2021 30/12/2021 3.00 3.00 0.33 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0.3333 0.3333 0.3333 1 1.5 0.75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.121 23.04 S5 BBEE BUZÓN 1007 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.122 23.04.01 S5 BBEE DISCIPLINA: CIVIL 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.123 23.04.01.01 S5 BBEE MOVIMIENTO DE TIERRAS EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.124 23.04.01.01.01 S5 BBEE EXCAVACIÓN PARA BUZONES ELÉCTRICOS m3 100.00% 0.1 0.00 03/12/2021 09/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.125 23.04.01.01.02 S5 BBEE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 100.00% 0.1 0.00 03/12/2021 09/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.126 23.04.01.01.03 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 100.00% 0.1 0.00 03/12/2021 09/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.127 23.04.01.01.04 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 100.00% 0.1 0.00 03/12/2021 09/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.128 23.04.01.01.05 S5 BBEE FILTRO DE GRAVA 1/2" m3 100.00% 0.1 0.00 03/12/2021 09/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.129 23.04.01.01.06 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 100.00% 0.1 0.00 03/12/2021 09/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.130 23.04.01.01.07 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 100.00% 0.1 0.00 03/12/2021 09/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.131 23.04.01.01.08 S5 BBEE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 100.00% 0.1 0.00 03/12/2021 09/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.132 19.01.02 S5 BBEE CONCRETO SIMPLE 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.133 23.04.01.02.01 S5 BBEE CONCRETO ARMADO EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.134 23.04.01.02.01.01 S5 BBEE SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 100.00% 0.1 0.00 17/12/2021 17/12/2021 1.00 1.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.135 23.04.01.02.01.02 S5 BBEE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 100.00% 0.1 0.00 17/12/2021 17/12/2021 1.00 1.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.136 23.04.01.02.01.03 S5 BBEE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 99.92% 0.1 0.00 17/12/2021 17/12/2021 1.00 1.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.137 23.04.01.02.02 S5 BBEE CURADO DE CONCRETO CON ADITIVO 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.138 23.04.01.02.02.01 S5 BBEE CURADO DE CONCRETO CON ANTISOL m2 100.00% 0.1 0.00 20/12/2021 22/12/2021 3.00 3.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.139 23.04.01.03 S5 BBEE CARPINTERIA METALICA 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.140 23.04.01.03.01 S5 BBEE SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA F°G° CON PLANCHA und 0.00% 0.1 1.00 24/12/2021 13/01/2022 21.00 21.00 0.05 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.33 0.5 0.25 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.33 0.5 0.25 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.3333 0.5 0.25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.141 23.04 S5 BBEE BUZÓN 1008 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.142 23.04.01 S5 BBEE DISCIPLINA: CIVIL 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.143 23.04.01.01 S5 BBEE MOVIMIENTO DE TIERRAS EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.144 23.04.01.01.01 S5 BBEE EXCAVACIÓN PARA BUZONES ELÉCTRICOS m3 93.53% 0.1 0.39 17/12/2021 19/12/2021 3.00 3.00 0.13 0.39 X 0.13 0.13 0.13 0 0 0 0 0.39 0.59 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.145 23.04.01.01.02 S5 BBEE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 93.59% 0.1 1.11 17/12/2021 19/12/2021 3.00 3.00 0.37 1.11 X 0.37 0.37 0.37 0 0 0 0 1.11 0.14 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.146 23.04.01.01.03 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 89.77% 0.1 0.05 17/12/2021 19/12/2021 3.00 3.00 0.02 0.05 X 0.0167 0.0167 0.0167 0 0 0 0 0.05 0.01 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.147 23.04.01.01.04 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 91.58% 0.1 0.23 17/12/2021 19/12/2021 3.00 3.00 0.08 0.23 X 0.0767 0.0767 0.0767 0 0 0 0 0.23 0.01 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.148 23.04.01.01.05 S5 BBEE FILTRO DE GRAVA 1/2" m3 92.58% 0.1 0.04 17/12/2021 19/12/2021 3.00 3.00 0.01 0.04 X 0.0133 0.0133 0.0133 0 0 0 0 0.04 0.11 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.149 23.04.01.01.06 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 93.97% 0.1 0.45 17/12/2021 19/12/2021 3.00 3.00 0.15 0.45 X 0.15 0.15 0.15 0 0 0 0 0.45 0.05 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.150 23.04.01.01.07 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 93.49% 0.1 0.96 17/12/2021 19/12/2021 3.00 3.00 0.32 0.96 X 0.32 0.32 0.32 0 0 0 0 0.96 0.04 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.151 23.04.01.01.08 S5 BBEE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 93.71% 0.1 0.47 17/12/2021 19/12/2021 3.00 3.00 0.16 0.47 X 0.1567 0.1567 0.1567 0 0 0 0 0.47 0.11 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.152 19.01.02 S5 BBEE CONCRETO SIMPLE 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.153 23.04.01.02.01 S5 BBEE CONCRETO ARMADO EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.154 23.04.01.02.01.01 S5 BBEE SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 86.52% 0.1 70.08 20/12/2021 20/12/2021 1.00 1.00 70.08 70.08 X 0 0 0 70.08 0 0 0 70.1 8.18 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.155 23.04.01.02.01.02 S5 BBEE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 55.78% 0.1 11.76 20/12/2021 20/12/2021 1.00 1.00 11.76 11.76 X 0 0 0 11.76 0 0 0 11.8 29.05 0.44 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.156 23.04.01.02.01.03 S5 BBEE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 55.80% 0.1 1.59 20/12/2021 20/12/2021 1.00 1.00 1.59 1.59 X 0 0 0 1.59 0 0 0 1.59 9.82 0.45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.157 23.04.01.02.02 S5 BBEE CURADO DE CONCRETO CON ADITIVO 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.158 23.04.01.02.02.01 S5 BBEE CURADO DE CONCRETO CON ANTISOL m2 25.97% 0.1 21.62 23/12/2021 25/12/2021 3.00 3.00 7.21 21.62 X 0 0 0 0 0 0 7.2067 7.21 0.99 0.25 7.2067 7.2067 0 0 0 0 0 14.4 1.9818333 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.159 23.04.01.03 S5 BBEE CARPINTERIA METALICA 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.160 23.04.01.03.01 S5 BBEE SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA F°G° CON PLANCHA und 0.00% 0.1 1.00 26/12/2021 15/01/2022 21.00 21.00 0.05 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0.0476 0.0476 0.0476 0.0476 0.0476 0.24 0.3571429 0.18 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.33 0.5 0.25 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.3333 0.5 0.25 0.0476 0.0476 0 0 0 0 0 0.1 0.142857 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.161 23.04 S5 BBEE BUZÓN 1009 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.162 23.04.01 S5 BBEE DISCIPLINA: CIVIL 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.163 23.04.01.01 S5 BBEE MOVIMIENTO DE TIERRAS EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.164 23.04.01.01.01 S5 BBEE EXCAVACIÓN PARA BUZONES ELÉCTRICOS m3 99.96% 0.1 0.00 10/12/2021 16/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.165 23.04.01.01.02 S5 BBEE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 99.98% 0.1 0.00 10/12/2021 16/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.166 23.04.01.01.03 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 99.77% 0.1 0.00 10/12/2021 16/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.167 23.04.01.01.04 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 100.00% 0.1 0.00 10/12/2021 16/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.168 23.04.01.01.05 S5 BBEE FILTRO DE GRAVA 1/2" m3 99.44% 0.1 0.00 10/12/2021 16/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.169 23.04.01.01.06 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 99.99% 0.1 0.00 10/12/2021 16/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.170 23.04.01.01.07 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 99.97% 0.1 0.00 10/12/2021 16/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.171 23.04.01.01.08 S5 BBEE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 99.96% 0.1 0.00 10/12/2021 16/12/2021 7.00 7.00 0.00 0.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.172 19.01.02 S5 BBEE CONCRETO SIMPLE 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.173 23.04.01.02.01 S5 BBEE CONCRETO ARMADO EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.174 23.04.01.02.01.01 S5 BBEE SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 86.52% 0.1 70.08 24/12/2021 13/01/2022 21.00 21.00 3.34 70.08 X 0 0 0 0 0 0 0 0 0.00 0 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 23.4 2.7253333 0.04 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 23.4 2.7253333 0.04 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 3.3371 23.36 2.72533333 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.175 23.04.01.02.01.02 S5 BBEE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 55.78% 0.1 11.76 24/12/2021 13/01/2022 21.00 21.00 0.56 11.76 X 0 0 0 0 0 0 0 0 0.00 0 0.56 0.56 0.56 0.56 0.56 0.56 0.56 3.92 9.684752 0.15 0.56 0.56 0.56 0.56 0.56 0.56 0.56 3.92 9.684752 0.15 0.56 0.56 0.56 0.56 0.56 0.56 0.56 3.92 9.684752 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.176 23.04.01.02.01.03 S5 BBEE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 55.80% 0.1 1.59 24/12/2021 13/01/2022 21.00 21.00 0.08 1.59 X 0 0 0 0 0 0 0 0 0.00 0 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.53 3.273545 0.15 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.53 3.273545 0.15 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.0757 0.53 3.273545 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.177 23.04.01.02.02 S5 BBEE CURADO DE CONCRETO CON ADITIVO 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.178 23.04.01.02.02.01 S5 BBEE CURADO DE CONCRETO CON ANTISOL m2 25.97% 0.1 21.62 27/12/2021 16/01/2022 21.00 21.00 1.03 21.62 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 1.0295 1.0295 1.0295 1.0295 4.12 0.5662381 0.14 1.0295 1.0295 1.0295 1.0295 1.0295 1.0295 1.0295 7.21 0.9909167 0.25 1.0295 1.0295 1.0295 1.0295 1.0295 1.0295 1.0295 7.2067 0.99091667 0.25 1.0295 1.0295 1.0295 0 0 0 0 3.09 0.424679 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.179 23.04.01.03 S5 BBEE CARPINTERIA METALICA 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.180 23.04.01.03.01 S5 BBEE SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA F°G° CON PLANCHA und 0.00% 0.1 1.00 30/12/2021 19/01/2022 21.00 21.00 0.05 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.0476 0.05 0.0714286 0.04 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.33 0.5 0.25 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.3333 0.5 0.25 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0 0.29 0.428571 0.21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.181 23.04 S5 BBEE BUZÓN 1010 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.182 23.04.01 S5 BBEE DISCIPLINA: CIVIL 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.183 23.04.01.01 S5 BBEE MOVIMIENTO DE TIERRAS EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.184 23.04.01.01.01 S5 BBEE EXCAVACIÓN PARA BUZONES ELÉCTRICOS m3 93.21% 0.1 0.41 17/12/2021 19/12/2021 3.00 3.00 0.14 0.41 X 0.1367 0.1367 0.1367 0 0 0 0 0.41 0.63 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.185 23.04.01.01.02 S5 BBEE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 93.27% 0.1 1.16 17/12/2021 19/12/2021 3.00 3.00 0.39 1.16 X 0.3867 0.3867 0.3867 0 0 0 0 1.16 0.15 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.186 23.04.01.01.03 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 90.77% 0.1 0.05 17/12/2021 19/12/2021 3.00 3.00 0.02 0.05 X 0.0167 0.0167 0.0167 0 0 0 0 0.05 0.01 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.187 23.04.01.01.04 S5 BBEE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 92.44% 0.1 0.20 17/12/2021 19/12/2021 3.00 3.00 0.07 0.20 X 0.0667 0.0667 0.0667 0 0 0 0 0.2 0.01 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.188 23.04.01.01.05 S5 BBEE FILTRO DE GRAVA 1/2" m3 92.24% 0.1 0.04 17/12/2021 19/12/2021 3.00 3.00 0.01 0.04 X 0.0133 0.0133 0.0133 0 0 0 0 0.04 0.11 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.189 23.04.01.01.06 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 93.67% 0.1 0.47 17/12/2021 19/12/2021 3.00 3.00 0.16 0.47 X 0.1567 0.1567 0.1567 0 0 0 0 0.47 0.05 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.190 23.04.01.01.07 S5 BBEE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 93.16% 0.1 1.01 17/12/2021 19/12/2021 3.00 3.00 0.34 1.01 X 0.3367 0.3367 0.3367 0 0 0 0 1.01 0.05 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.191 23.04.01.01.08 S5 BBEE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 93.40% 0.1 0.49 17/12/2021 19/12/2021 3.00 3.00 0.16 0.49 X 0.1633 0.1633 0.1633 0 0 0 0 0.49 0.12 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.192 19.01.02 S5 BBEE CONCRETO SIMPLE 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.193 23.04.01.02.01 S5 BBEE CONCRETO ARMADO EN BUZONES ELÉCTRICOS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.194 23.04.01.02.01.01 S5 BBEE SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZ kg 86.52% 0.1 70.08 20/12/2021 20/12/2021 1.00 1.00 70.08 70.08 X 0 0 0 70.08 0 0 0 70.1 8.18 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.195 23.04.01.02.01.02 S5 BBEE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 55.78% 0.1 11.76 20/12/2021 20/12/2021 1.00 1.00 11.76 11.76 X 0 0 0 11.76 0 0 0 11.8 29.05 0.44 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.196 23.04.01.02.01.03 S5 BBEE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 55.80% 0.1 1.59 20/12/2021 20/12/2021 1.00 1.00 1.59 1.59 X 0 0 0 1.59 0 0 0 1.59 9.82 0.45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.197 23.04.01.02.02 S5 BBEE CURADO DE CONCRETO CON ADITIVO 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.198 23.04.01.02.02.01 S5 BBEE CURADO DE CONCRETO CON ANTISOL m2 25.97% 0.1 21.62 23/12/2021 23/12/2021 1.00 1.00 21.62 21.62 X 0 0 0 0 0 0 21.62 21.6 2.97 0.74 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2372.199 23.04.01.03 S5 BBEE CARPINTERIA METALICA 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2372.200 23.04.01.03.01 S5 BBEE SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA F°G° CON PLANCHA und 0.00% 0.1 1.00 26/12/2021 15/01/2022 21.00 21.00 0.05 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0.0476 0.0476 0.0476 0.0476 0.0476 0.24 0.3571429 0.18 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.33 0.5 0.25 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.0476 0.3333 0.5 0.25 0.0476 0.0476 0 0 0 0 0 0.1 0.142857 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.1 23.05.01.01 S5 IE MOVIMIENTO DE TIERRAS - 01, 07 (2 POSTES) 0.35 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.2 23.05.01.01.01 S5 IE EXCAVACION MASIVA CON EQUIPO m3 57.62% 0.35 8.01 24/12/2021 13/01/2022 21.00 21.00 0.38 8.01 X 0 0 0 0 0 0 0 0 0.00 0 0.3814 0.3814 0.3814 0.3814 0.3814 0.3814 0.3814 2.67 3.8778571 0.14 0.3814 0.3814 0.3814 0.3814 0.3814 0.3814 0.3814 2.67 3.8778571 0.14 0.3814 0.3814 0.3814 0.3814 0.3814 0.3814 0.3814 2.67 3.87785714 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.3 23.05.01.01.02 S5 IE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 57.59% 0.35 9.35 24/12/2021 13/01/2022 21.00 21.00 0.45 9.35 X 0 0 0 0 0 0 0 0 0.00 0 0.4452 0.4452 0.4452 0.4452 0.4452 0.4452 0.4452 3.12 0.397375 0.13 0.4452 0.4452 0.4452 0.4452 0.4452 0.4452 0.4452 3.12 0.397375 0.13 0.4452 0.4452 0.4452 0.4452 0.4452 0.4452 0.4452 3.1167 0.397375 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.4 23.05.01.01.03 S5 IE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 50.58% 0.35 5.71 24/12/2021 13/01/2022 21.00 21.00 0.27 5.71 X 0 0 0 0 0 0 0 0 0.00 0 0.2719 0.2719 0.2719 0.2719 0.2719 0.2719 0.2719 1.9 0.2950167 0.15 0.2719 0.2719 0.2719 0.2719 0.2719 0.2719 0.2719 1.9 0.2950167 0.15 0.2719 0.2719 0.2719 0.2719 0.2719 0.2719 0.2719 1.9033 0.29501667 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.5 23.05.01.01.04 S5 IE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 49.75% 0.35 33.24 24/12/2021 13/01/2022 21.00 21.00 1.58 33.24 X 0 0 0 0 0 0 0 0 0.00 0 1.5829 1.5829 1.5829 1.5829 1.5829 1.5829 1.5829 11.1 0.4062667 0.2 1.5829 1.5829 1.5829 1.5829 1.5829 1.5829 1.5829 11.1 0.4062667 0.2 1.5829 1.5829 1.5829 1.5829 1.5829 1.5829 1.5829 11.08 0.40626667 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.6 23.05.01.01.05 S5 IE RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 50.08% 0.35 4.54 24/12/2021 13/01/2022 21.00 21.00 0.22 4.54 X 0 0 0 0 0 0 0 0 0.00 0 0.2162 0.2162 0.2162 0.2162 0.2162 0.2162 0.2162 1.51 2.6861667 0.17 0.2162 0.2162 0.2162 0.2162 0.2162 0.2162 0.2162 1.51 2.6861667 0.17 0.2162 0.2162 0.2162 0.2162 0.2162 0.2162 0.2162 1.5133 2.68616667 0.17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.7 23.05.01.01.06 S5 IE RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 49.88% 0.35 5.09 24/12/2021 13/01/2022 21.00 21.00 0.24 5.09 X 0 0 0 0 0 0 0 0 0.00 0 0.2424 0.2424 0.2424 0.2424 0.2424 0.2424 0.2424 1.7 3.43575 0.16 0.2424 0.2424 0.2424 0.2424 0.2424 0.2424 0.2424 1.7 3.43575 0.16 0.2424 0.2424 0.2424 0.2424 0.2424 0.2424 0.2424 1.6967 3.43575 0.16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.8 23.05.01.01.07 S5 IE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 55.77% 0.35 4.95 24/12/2021 13/01/2022 21.00 21.00 0.24 4.95 X 0 0 0 0 0 0 0 0 0.00 0 0.2357 0.2357 0.2357 0.2357 0.2357 0.2357 0.2357 1.65 0.18942 0.19 0.2357 0.2357 0.2357 0.2357 0.2357 0.2357 0.2357 1.65 0.18942 0.19 0.2357 0.2357 0.2357 0.2357 0.2357 0.2357 0.2357 1.65 0.18942 0.19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.9 23.05.01.01.08 S5 IE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 57.09% 0.35 9.46 24/12/2021 13/01/2022 21.00 21.00 0.45 9.46 X 0 0 0 0 0 0 0 0 0.00 0 0.4505 0.4505 0.4505 0.4505 0.4505 0.4505 0.4505 3.15 0.1472607 0.15 0.4505 0.4505 0.4505 0.4505 0.4505 0.4505 0.4505 3.15 0.1472607 0.15 0.4505 0.4505 0.4505 0.4505 0.4505 0.4505 0.4505 3.1533 0.14726067 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.10 23.05.01.01.09 S5 IE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 56.21% 0.35 4.90 24/12/2021 13/01/2022 21.00 21.00 0.23 4.90 X 0 0 0 0 0 0 0 0 0.00 0 0.2333 0.2333 0.2333 0.2333 0.2333 0.2333 0.2333 1.63 0.3835859 0.13 0.2333 0.2333 0.2333 0.2333 0.2333 0.2333 0.2333 1.63 0.3835859 0.13 0.2333 0.2333 0.2333 0.2333 0.2333 0.2333 0.2333 1.6333 0.38358586 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.11 20.01.02 S5 IE CONCRETO SIMPLE 0.35 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.12 23.05.01.02.01 S5 IE CONCRETO PARA POSTES DE ILUMINACION EXTERIOR 0.35 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.13 23.05.01.02.01.01 S5 IE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 62.22% 0.35 1.19 25/12/2021 05/01/2022 12.00 12.00 0.10 1.19 X 0 0 0 0 0 0 0 0 0.00 0 0 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.6 3.675 0.19 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0 0.6 3.675 0.19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.14 23.05.01.02.01.02 S5 IE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 68.84% 0.35 6.33 24/12/2021 04/01/2022 12.00 12.00 0.53 6.33 X 0 0 0 0 0 0 0 0 0.00 0 0.5275 0.5275 0.5275 0.5275 0.5275 0.5275 0.5275 3.69 9.1226905 0.18 0.5275 0.5275 0.5275 0.5275 0.5275 0 0 2.64 6.5162075 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.15 23.05.01.02.02 S5 IE CURADO DE CONCRETO CON ADITIVO 0.35 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.16 23.05.01.02.02.01 S5 IE CURADO DE CONCRETO CON ANTISOL m2 24.06% 0.35 16.74 28/12/2021 08/01/2022 12.00 12.00 1.40 16.74 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 1.395 1.395 1.395 4.19 0.5754375 0.19 1.395 1.395 1.395 1.395 1.395 1.395 1.395 9.77 1.3426875 0.45 1.395 1.395 0 0 0 0 0 2.79 0.383625 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.17 23.05.01.01 S5 IE MOVIMIENTO DE TIERRAS - 09 (1 POSTE) 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.18 23.05.01.01.01 S5 IE EXCAVACION MASIVA CON EQUIPO m3 57.62% 0.1 2.29 24/12/2021 13/01/2022 21.00 21.00 0.11 2.29 X 0 0 0 0 0 0 0 0 0.00 0 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.76 1.1086508 0.14 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.76 1.1086508 0.14 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.7633 1.10865079 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.19 23.05.01.01.02 S5 IE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 57.59% 0.1 2.67 24/12/2021 13/01/2022 21.00 21.00 0.13 2.67 X 0 0 0 0 0 0 0 0 0.00 0 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.89 0.113475 0.11 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.89 0.113475 0.11 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.89 0.113475 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.20 23.05.01.01.03 S5 IE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 50.58% 0.1 1.63 24/12/2021 13/01/2022 21.00 21.00 0.08 1.63 X 0 0 0 0 0 0 0 0 0.00 0 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.54 0.0842167 0.08 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.54 0.0842167 0.08 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.5433 0.08421667 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.21 23.05.01.01.04 S5 IE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 49.75% 0.1 9.50 24/12/2021 13/01/2022 21.00 21.00 0.45 9.50 X 0 0 0 0 0 0 0 0 0.00 0 0.4524 0.4524 0.4524 0.4524 0.4524 0.4524 0.4524 3.17 0.1161111 0.12 0.4524 0.4524 0.4524 0.4524 0.4524 0.4524 0.4524 3.1
2407.29 23.05.01.02.01.01 S5 IE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 62.22% 0.1 0.34 25/12/2021 05/01/2022 12.00 12.00 0.03 0.34 X 0 0 0 0 0 0 0 0 0.00 0 0 0.0283 0.0283 0.0283 0.0283 0.0283 0.0283 0.17 1.05 0.18 0.0283 0.0283 0.0283 0.0283 0.0283 0.0283 0 0.17 1.05 0.18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.30 23.05.01.02.01.02 S5 IE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 68.84% 0.1 1.81 24/12/2021 04/01/2022 12.00 12.00 0.15 1.81 X 0 0 0 0 0 0 0 0 0.00 0 0.1508 0.1508 0.1508 0.1508 0.1508 0.1508 0.1508 1.06 2.6085418 0.19 0.1508 0.1508 0.1508 0.1508 0.1508 0 0 0.75 1.8632442 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.31 23.05.01.02.02 S5 IE CURADO DE CONCRETO CON ADITIVO 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.32 23.05.01.02.02.01 S5 IE CURADO DE CONCRETO CON ANTISOL m2 24.06% 0.1 4.78 28/12/2021 08/01/2022 12.00 12.00 0.40 4.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0.3983 0.3983 0.3983 1.2 0.1643125 0.16 0.3983 0.3983 0.3983 0.3983 0.3983 0.3983 0.3983 2.79 0.3833958 0.38 0.3983 0.3983 0 0 0 0 0 0.7967 0.10954167 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.33 23.05.01.01 S5 IE MOVIMIENTO DE TIERRAS - 08, 10, 11, 12 (4 POSTES) 0.35 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.34 23.05.01.01.01 S5 IE EXCAVACION MASIVA CON EQUIPO m3 57.62% 0.35 8.01 24/12/2021 13/01/2022 21.00 21.00 0.38 8.01 X 0 0 0 0 0 0 0 0 0.00 0 0.3814 0.3814 0.3814 0.3814 0.3814 0.3814 0.3814 2.67 3.8778571 0.14 0.3814 0.3814 0.3814 0.3814 0.3814 0.3814 0.3814 2.67 3.8778571 0.14 0.3814 0.3814 0.3814 0.3814 0.3814 0.3814 0.3814 2.67 3.87785714 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.35 23.05.01.01.02 S5 IE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 57.59% 0.35 9.35 24/12/2021 13/01/2022 21.00 21.00 0.45 9.35 X 0 0 0 0 0 0 0 0 0.00 0 0.4452 0.4452 0.4452 0.4452 0.4452 0.4452 0.4452 3.12 0.397375 0.13 0.4452 0.4452 0.4452 0.4452 0.4452 0.4452 0.4452 3.12 0.397375 0.13 0.4452 0.4452 0.4452 0.4452 0.4452 0.4452 0.4452 3.1167 0.397375 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.36 23.05.01.01.03 S5 IE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 50.58% 0.35 5.71 24/12/2021 13/01/2022 21.00 21.00 0.27 5.71 X 0 0 0 0 0 0 0 0 0.00 0 0.2719 0.2719 0.2719 0.2719 0.2719 0.2719 0.2719 1.9 0.2950167 0.15 0.2719 0.2719 0.2719 0.2719 0.2719 0.2719 0.2719 1.9 0.2950167 0.15 0.2719 0.2719 0.2719 0.2719 0.2719 0.2719 0.2719 1.9033 0.29501667 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.37 23.05.01.01.04 S5 IE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 49.75% 0.35 33.24 24/12/2021 13/01/2022 21.00 21.00 1.58 33.24 X 0 0 0 0 0 0 0 0 0.00 0 1.5829 1.5829 1.5829 1.5829 1.5829 1.5829 1.5829 11.1 0.4062667 0.2 1.5829 1.5829 1.5829 1.5829 1.5829 1.5829 1.5829 11.1 0.4062667 0.2 1.5829 1.5829 1.5829 1.5829 1.5829 1.5829 1.5829 11.08 0.40626667 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.38 23.05.01.01.05 S5 IE RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 50.08% 0.35 4.54 24/12/2021 13/01/2022 21.00 21.00 0.22 4.54 X 0 0 0 0 0 0 0 0 0.00 0 0.2162 0.2162 0.2162 0.2162 0.2162 0.2162 0.2162 1.51 2.6861667 0.17 0.2162 0.2162 0.2162 0.2162 0.2162 0.2162 0.2162 1.51 2.6861667 0.17 0.2162 0.2162 0.2162 0.2162 0.2162 0.2162 0.2162 1.5133 2.68616667 0.17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.39 23.05.01.01.06 S5 IE RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 49.88% 0.35 5.09 24/12/2021 13/01/2022 21.00 21.00 0.24 5.09 X 0 0 0 0 0 0 0 0 0.00 0 0.2424 0.2424 0.2424 0.2424 0.2424 0.2424 0.2424 1.7 3.43575 0.16 0.2424 0.2424 0.2424 0.2424 0.2424 0.2424 0.2424 1.7 3.43575 0.16 0.2424 0.2424 0.2424 0.2424 0.2424 0.2424 0.2424 1.6967 3.43575 0.16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.40 23.05.01.01.07 S5 IE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 55.77% 0.35 4.95 24/12/2021 13/01/2022 21.00 21.00 0.24 4.95 X 0 0 0 0 0 0 0 0 0.00 0 0.2357 0.2357 0.2357 0.2357 0.2357 0.2357 0.2357 1.65 0.18942 0.19 0.2357 0.2357 0.2357 0.2357 0.2357 0.2357 0.2357 1.65 0.18942 0.19 0.2357 0.2357 0.2357 0.2357 0.2357 0.2357 0.2357 1.65 0.18942 0.19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.41 23.05.01.01.08 S5 IE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 57.09% 0.35 9.46 24/12/2021 13/01/2022 21.00 21.00 0.45 9.46 X 0 0 0 0 0 0 0 0 0.00 0 0.4505 0.4505 0.4505 0.4505 0.4505 0.4505 0.4505 3.15 0.1472607 0.15 0.4505 0.4505 0.4505 0.4505 0.4505 0.4505 0.4505 3.15 0.1472607 0.15 0.4505 0.4505 0.4505 0.4505 0.4505 0.4505 0.4505 3.1533 0.14726067 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.42 23.05.01.01.09 S5 IE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 56.21% 0.35 4.90 24/12/2021 13/01/2022 21.00 21.00 0.23 4.90 X 0 0 0 0 0 0 0 0 0.00 0 0.2333 0.2333 0.2333 0.2333 0.2333 0.2333 0.2333 1.63 0.3835859 0.13 0.2333 0.2333 0.2333 0.2333 0.2333 0.2333 0.2333 1.63 0.3835859 0.13 0.2333 0.2333 0.2333 0.2333 0.2333 0.2333 0.2333 1.6333 0.38358586 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.43 20.01.02 S5 IE CONCRETO SIMPLE 0.35 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.44 23.05.01.02.01 S5 IE CONCRETO PARA POSTES DE ILUMINACION EXTERIOR 0.35 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.45 23.05.01.02.01.01 S5 IE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 62.22% 0.35 1.19 25/12/2021 05/01/2022 12.00 12.00 0.10 1.19 X 0 0 0 0 0 0 0 0 0.00 0 0 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.6 3.675 0.19 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0 0.6 3.675 0.19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.46 23.05.01.02.01.02 S5 IE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 68.84% 0.35 6.33 24/12/2021 04/01/2022 12.00 12.00 0.53 6.33 X 0 0 0 0 0 0 0 0 0.00 0 0.5275 0.5275 0.5275 0.5275 0.5275 0.5275 0.5275 3.69 9.1226905 0.18 0.5275 0.5275 0.5275 0.5275 0.5275 0 0 2.64 6.5162075 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.47 23.05.01.02.02 S5 IE CURADO DE CONCRETO CON ADITIVO 0.35 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.48 23.05.01.02.02.01 S5 IE CURADO DE CONCRETO CON ANTISOL m2 24.06% 0.35 16.74 28/12/2021 08/01/2022 12.00 12.00 1.40 16.74 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 1.395 1.395 1.395 4.19 0.5754375 0.19 1.395 1.395 1.395 1.395 1.395 1.395 1.395 9.77 1.3426875 0.45 1.395 1.395 0 0 0 0 0 2.79 0.383625 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.49 23.05.01.01 S5 IE MOVIMIENTO DE TIERRAS - 06, 13, 14 (3 POSTE) 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.50 23.05.01.01.01 S5 IE EXCAVACION MASIVA CON EQUIPO m3 57.62% 0.1 2.29 24/12/2021 13/01/2022 21.00 21.00 0.11 2.29 X 0 0 0 0 0 0 0 0 0.00 0 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.76 1.1086508 0.14 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.76 1.1086508 0.14 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.7633 1.10865079 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.51 23.05.01.01.02 S5 IE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 57.59% 0.1 2.67 24/12/2021 13/01/2022 21.00 21.00 0.13 2.67 X 0 0 0 0 0 0 0 0 0.00 0 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.89 0.113475 0.11 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.89 0.113475 0.11 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.89 0.113475 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.52 23.05.01.01.03 S5 IE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 50.58% 0.1 1.63 24/12/2021 13/01/2022 21.00 21.00 0.08 1.63 X 0 0 0 0 0 0 0 0 0.00 0 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.54 0.0842167 0.08 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.54 0.0842167 0.08 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.5433 0.08421667 0.08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.53 23.05.01.01.04 S5 IE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 49.75% 0.1 9.50 24/12/2021 13/01/2022 21.00 21.00 0.45 9.50 X 0 0 0 0 0 0 0 0 0.00 0 0.4524 0.4524 0.4524 0.4524 0.4524 0.4524 0.4524 3.17 0.1161111 0.12 0.4524 0.4524 0.4524 0.4524 0.4524 0.4524 0.4524 3.17 0.1161111 0.12 0.4524 0.4524 0.4524 0.4524 0.4524 0.4524 0.4524 3.1667 0.11611111 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.54 23.05.01.01.05 S5 IE RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 50.08% 0.1 1.30 24/12/2021 13/01/2022 21.00 21.00 0.06 1.30 X 0 0 0 0 0 0 0 0 0.00 0 0.0619 0.0619 0.0619 0.0619 0.0619 0.0619 0.0619 0.43 0.7691667 0.15 0.0619 0.0619 0.0619 0.0619 0.0619 0.0619 0.0619 0.43 0.7691667 0.15 0.0619 0.0619 0.0619 0.0619 0.0619 0.0619 0.0619 0.4333 0.76916667 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.55 23.05.01.01.06 S5 IE RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 49.88% 0.1 1.45 24/12/2021 13/01/2022 21.00 21.00 0.07 1.45 X 0 0 0 0 0 0 0 0 0.00 0 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.48 0.97875 0.16 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.48 0.97875 0.16 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.4833 0.97875 0.16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.56 23.05.01.01.07 S5 IE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 55.77% 0.1 1.42 24/12/2021 13/01/2022 21.00 21.00 0.07 1.42 X 0 0 0 0 0 0 0 0 0.00 0 0.0676 0.0676 0.0676 0.0676 0.0676 0.0676 0.0676 0.47 0.0543387 ### 0.0676 0.0676 0.0676 0.0676 0.0676 0.0676 0.0676 0.47 0.0543387 ### 0.0676 0.0676 0.0676 0.0676 0.0676 0.0676 0.0676 0.4733 0.05433867 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.57 23.05.01.01.08 S5 IE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 57.09% 0.1 2.70 24/12/2021 13/01/2022 21.00 21.00 0.13 2.70 X 0 0 0 0 0 0 0 0 0.00 0 0.1286 0.1286 0.1286 0.1286 0.1286 0.1286 0.1286 0.9 0.04203 ### 0.1286 0.1286 0.1286 0.1286 0.1286 0.1286 0.1286 0.9 0.04203 ### 0.1286 0.1286 0.1286 0.1286 0.1286 0.1286 0.1286 0.9 0.04203 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.58 23.05.01.01.09 S5 IE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 56.21% 0.1 1.40 24/12/2021 13/01/2022 21.00 21.00 0.07 1.40 X 0 0 0 0 0 0 0 0 0.00 0 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.47 0.109596 0.11 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.47 0.109596 0.11 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.4667 0.10959596 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.59 20.01.02 S5 IE CONCRETO SIMPLE 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.60 23.05.01.02.01 S5 IE CONCRETO PARA POSTES DE ILUMINACION EXTERIOR 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.61 23.05.01.02.01.01 S5 IE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 62.22% 0.1 0.34 01/01/2022 12/01/2022 12.00 12.00 0.03 0.34 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0.0283 0.0283 0.0283 0.0283 0.0283 0.0283 0.17 1.05 0.18 0.0283 0.0283 0.0283 0.0283 0.0283 0.0283 0 0.17 1.05 0.18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.62 23.05.01.02.01.02 S5 IE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 68.84% 0.1 1.81 31/12/2021 11/01/2022 12.00 12.00 0.15 1.81 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1508 0.1508 0.1508 0.1508 0.1508 0.1508 0.1508 1.06 2.6085418 0.19 0.1508 0.1508 0.1508 0.1508 0.1508 0 0 0.7542 1.86324417 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.63 23.05.01.02.02 S5 IE CURADO DE CONCRETO CON ADITIVO 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.64 23.05.01.02.02.01 S5 IE CURADO DE CONCRETO CON ANTISOL m2 24.06% 0.1 4.78 04/01/2022 15/01/2022 12.00 12.00 0.40 4.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3983 0.3983 0.3983 1.2 0.1643125 0.16 0.3983 0.3983 0.3983 0.3983 0.3983 0.3983 0.3983 2.7883 0.38339583 0.38 0.3983 0.3983 0 0 0 0 0 0.8 0.109542 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.65 23.05.01.01 S5 IE MOVIMIENTO DE TIERRAS - 02, 03, 04, 05 (4 POSTES) 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.66 23.05.01.01.01 S5 IE EXCAVACION MASIVA CON EQUIPO m3 57.62% 0.1 2.29 15/01/2022 04/02/2022 21.00 21.00 0.11 2.29 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.109 0.109 0.109 0.109 0.109 0.109 0.65 0.950272 0.12 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.76 1.108651 0.14 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.76 1.1086508 0.14 0.109 0 0 0 0 0 0 0.110.158379 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.67 23.05.01.01.02 S5 IE REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 57.59% 0.1 2.67 15/01/2022 04/02/2022 21.00 21.00 0.13 2.67 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.76 0.097264 0.1 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.89 0.113475 0.11 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.1271 0.89 0.113475 0.11 0.1271 0 0 0 0 0 0 0.130.016211 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.68 23.05.01.01.03 S5 IE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 50.58% 0.1 1.63 15/01/2022 04/02/2022 21.00 21.00 0.08 1.63 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.47 0.072186 0.07 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.54 0.084217 0.08 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.0776 0.54 0.0842167 0.08 0.0776 0 0 0 0 0 0 0.080.012031 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.69 23.05.01.01.04 S5 IE TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 m3 -KM 49.75% 0.1 9.50 15/01/2022 04/02/2022 21.00 21.00 0.45 9.50 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4524 0.4524 0.4524 0.4524 0.4524 0.4524 2.71 0.099524 0.1 0.4524 0.4524 0.4524 0.4524 0.4524 0.4524 0.4524 3.17 0.116111 0.12 0.4524 0.4524 0.4524 0.4524 0.4524 0.4524 0.4524 3.17 0.1161111 0.12 0.4524 0 0 0 0 0 0 0.450.016587 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.70 23.05.01.01.05 S5 IE RELLENO CON MATERIAL DE PRESTAMO APTO PARA RELLENO m3 50.08% 0.1 1.30 15/01/2022 04/02/2022 21.00 21.00 0.06 1.30 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0619 0.0619 0.0619 0.0619 0.0619 0.0619 0.37 0.659286 0.13 0.0619 0.0619 0.0619 0.0619 0.0619 0.0619 0.0619 0.43 0.769167 0.15 0.0619 0.0619 0.0619 0.0619 0.0619 0.0619 0.0619 0.43 0.7691667 0.15 0.0619 0 0 0 0 0 0 0.060.109881 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.71 23.05.01.01.06 S5 IE RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 49.88% 0.1 1.45 15/01/2022 04/02/2022 21.00 21.00 0.07 1.45 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.069 0.069 0.069 0.069 0.069 0.069 0.41 0.838929 0.14 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.48 0.97875 0.16 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.48 0.97875 0.16 0.069 0 0 0 0 0 0 0.070.139821 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.72 23.05.01.01.07 S5 IE ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 55.77% 0.1 1.42 15/01/2022 04/02/2022 21.00 21.00 0.07 1.42 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0.0676 0.0676 0.0676 0.0676 0.0676 0.0676 0.41 0.046576 ### 0.0676 0.0676 0.0676 0.0676 0.0676 0.0676 0.0676 0.47 0.054339 ### 0.0676 0.0676 0.0676 0.0676 0.0676 0.0676 0.0676 0.47 0.0543387 ### 0.0676 0 0 0 0 0 0 0.070.007763 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.73 23.05.01.01.08 S5 IE ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 57.09% 0.1 2.70 15/01/2022 04/02/2022 21.00 21.00 0.13 2.70 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0.1286 0.1286 0.1286 0.1286 0.1286 0.1286 0.77 0.036026 ### 0.1286 0.1286 0.1286 0.1286 0.1286 0.1286 0.1286 0.9 0.04203 ### 0.1286 0.1286 0.1286 0.1286 0.1286 0.1286 0.1286 0.9 0.04203 ### 0.1286 0 0 0 0 0 0 0.130.006004 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.74 23.05.01.01.09 S5 IE APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 56.21% 0.1 1.40 15/01/2022 04/02/2022 21.00 21.00 0.07 1.40 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.4 0.093939 0.09 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.47 0.109596 0.11 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.0667 0.47 0.109596 0.11 0.0667 0 0 0 0 0 0 0.070.015657 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.75 20.01.02 S5 IE CONCRETO SIMPLE 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.76 23.05.01.02.01 S5 IE CONCRETO PARA POSTES DE ILUMINACION EXTERIOR 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.77 23.05.01.02.01.01 S5 IE COLOCACIÓN DE CONCRETO F'c=20 MPa m3 62.22% 0.1 0.34 16/01/2022 27/01/2022 12.00 12.00 0.03 0.34 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0283 0.0283 0.0283 0.0283 0.0283 0.14 0.875 0.15 0.0283 0.0283 0.0283 0.0283 0.0283 0.0283 0.0283 0.2 1.225 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.78 23.05.01.02.01.02 S5 IE ENCOFRADO CARAVISTA Y DESENCOFRADO m2 68.84% 0.1 1.81 15/01/2022 26/01/2022 12.00 12.00 0.15 1.81 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1508 0.1508 0.1508 0.1508 0.1508 0.1508 0.91 2.235893 0.16 0.1508 0.1508 0.1508 0.1508 0.1508 0.1508 0 0.91 2.235893 0.16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.79 23.05.01.02.02 S5 IE CURADO DE CONCRETO CON ADITIVO 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.80 23.05.01.02.02.01 S5 IE CURADO DE CONCRETO CON ANTISOL m2 24.06% 0.1 4.78 19/01/2022 30/01/2022 12.00 12.00 0.40 4.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3983 0.3983 0.8 0.109542 0.11 0.3983 0.3983 0.3983 0.3983 0.3983 0.3983 0.3983 2.79 0.383396 0.38 0.3983 0.3983 0.3983 0 0 0 0 1.2 0.1643125 0.16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.81 23.05.02 S5 IE REFLECTORES 01 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.82 23.05.02.01 S5 IE SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.83 23.05.02.01.01 S5 IE SUMINISTRO Y MONTAJE DE EQUIPO FLUORESCENTE HOLOPHANE PM pto 0.00% 0.03704 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.84 23.05.02.02 S5 IE TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.85 23.05.02.02.01 S5 IE SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE UND 0.00% 0.03704 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 1.3767 1.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.86 23.05.02.03 S5 IE CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.87 23.05.02.03.01 S5 IE SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.03704 7.33 15/01/2022 16/01/2022 2.00 2.00 3.67 7.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.665 3.665 0 0 0 0 7.33 4.16344 1.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.88 23.05.02.03.02 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.03704 4.81 15/01/2022 16/01/2022 2.00 2.00 2.41 4.81 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.405 2.405 0 0 0 0 4.81 3.847519 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.89 23.05.02.03.03 S5 IE SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 0.03704 5.59 15/01/2022 16/01/2022 2.00 2.00 2.80 5.59 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.795 2.795 0 0 0 0 5.59 5.3664 1.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.90 23.05.02.03.04 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 0.03704 2.19 15/01/2022 16/01/2022 2.00 2.00 1.10 2.19 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.095 1.095 0 0 0 0 2.19 2.66304 0.89 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.91 23.05.02.03.05 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.03704 7.78 15/01/2022 16/01/2022 2.00 2.00 3.89 7.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.89 3.89 0 0 0 0 7.78 7.024562 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.92 23.05.02.04 S5 IE CONDUCTORES Y CABLES DE ENERGIA 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.93 23.05.02.04.01 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #8 AWG + GRD; XHHW-2, 0 m 0.00% 0.03704 24.44 15/01/2022 16/01/2022 2.00 2.00 12.22 24.44 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12.22 12.22 0 0 0 0 24.4 5.811832 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.94 23.05.02.04.02 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #8 AWG + GRD, XHHW-2, 0 m 0.00% 0.03704 7.78 15/01/2022 16/01/2022 2.00 2.00 3.89 7.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.89 3.89 0 0 0 0 7.78 2.245308 1.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.95 23.05.02.05 S5 IE ILUMINACION EXTERIOR 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.96 23.05.02.05.01 S5 IE SUMINISTRO Y MONTAJE DE POSTE METÁLICO DE 12m DE ALTURA UND 0.00% 0.03704 1.00 14/01/2022 14/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 61.44 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.97 23.05.02.05.02 S5 IE PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 0.00% 0.03704 0.04 14/01/2022 14/01/2022 1.00 1.00 0.04 0.04 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.04 0 0 0 0 0 0 0.04 8.16 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.98 23.05.02 S5 IE REFLECTORES 02 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.99 23.05.02.01 S5 IE SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.100 23.05.02.01.01 S5 IE SUMINISTRO Y MONTAJE DE EQUIPO FLUORESCENTE HOLOPHANE PM pto 0.00% 0.07407 2.00 06/02/2022 06/02/2022 1.00 1.00 2.00 2.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 2 16 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.101 23.05.02.02 S5 IE TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.102 23.05.02.02.01 S5 IE SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE UND 0.00% 0.07407 1.00 06/02/2022 06/02/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 1.3767 1.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.103 23.05.02.03 S5 IE CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.104 23.05.02.03.01 S5 IE SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.07407 14.67 06/02/2022 07/02/2022 2.00 2.00 7.34 14.67 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.335 7.335 0 0 0 14.7 8.33256 1.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.105 23.05.02.03.02 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.07407 9.63 06/02/2022 07/02/2022 2.00 2.00 4.82 9.63 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.815 4.815 0 0 0 9.637.703037 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.106 23.05.02.03.03 S5 IE SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 0.07407 11.19 06/02/2022 07/02/2022 2.00 2.00 5.60 11.19 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.595 5.595 0 0 0 11.2 10.7424 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.107 23.05.02.03.04 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 0.07407 4.37 06/02/2022 07/02/2022 2.00 2.00 2.19 4.37 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.185 2.185 0 0 0 4.37 5.31392 1.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.108 23.05.02.03.05 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.07407 15.56 06/02/2022 07/02/2022 2.00 2.00 7.78 15.56 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.78 7.78 0 0 0 15.614.04912 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.109 23.05.02.04 S5 IE CONDUCTORES Y CABLES DE ENERGIA 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.110 23.05.02.04.01 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #8 AWG + GRD; XHHW-2, 0 m 0.00% 0.07407 48.89 06/02/2022 07/02/2022 2.00 2.00 24.45 48.89 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24.445 24.445 0 0 0 48.911.62604 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.111 23.05.02.04.02 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #8 AWG + GRD, XHHW-2, 0 m 0.00% 0.07407 15.56 06/02/2022 07/02/2022 2.00 2.00 7.78 15.56 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.78 7.78 0 0 0 15.64.490616 1.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.112 23.05.02.05 S5 IE ILUMINACION EXTERIOR 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.113 23.05.02.05.01 S5 IE SUMINISTRO Y MONTAJE DE POSTE METÁLICO DE 12m DE ALTURA UND 0.00% 0.07407 1.00 05/02/2022 05/02/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 61.44 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.114 23.05.02.05.02 S5 IE PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 0.00% 0.07407 0.07 05/02/2022 05/02/2022 1.00 1.00 0.07 0.07 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.07 0 0 0 0 0 0.07 14.28 0.95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.115 23.05.02 S5 IE REFLECTORES 03 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.116 23.05.02.01 S5 IE SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.117 23.05.02.01.01 S5 IE SUMINISTRO Y MONTAJE DE EQUIPO FLUORESCENTE HOLOPHANE PM pto 0.00% 0.03704 1.00 06/02/2022 06/02/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.118 23.05.02.02 S5 IE TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.119 23.05.02.02.01 S5 IE SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE UND 0.00% 0.03704 1.00 06/02/2022 06/02/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 1.3767 1.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.120 23.05.02.03 S5 IE CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.121 23.05.02.03.01 S5 IE SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.03704 7.33 06/02/2022 07/02/2022 2.00 2.00 3.67 7.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.665 3.665 0 0 0 7.33 4.16344 1.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.122 23.05.02.03.02 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.03704 4.81 06/02/2022 07/02/2022 2.00 2.00 2.41 4.81 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.405 2.405 0 0 0 4.813.847519 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.123 23.05.02.03.03 S5 IE SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 0.03704 5.59 06/02/2022 07/02/2022 2.00 2.00 2.80 5.59 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.795 2.795 0 0 0 5.59 5.3664 1.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.124 23.05.02.03.04 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 0.03704 2.19 06/02/2022 07/02/2022 2.00 2.00 1.10 2.19 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.095 1.095 0 0 0 2.19 2.66304 0.89 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.125 23.05.02.03.05 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.03704 7.78 06/02/2022 07/02/2022 2.00 2.00 3.89 7.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.89 3.89 0 0 0 7.787.024562 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.126 23.05.02.04 S5 IE CONDUCTORES Y CABLES DE ENERGIA 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.127 23.05.02.04.01 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #8 AWG + GRD; XHHW-2, 0 m 0.00% 0.03704 24.44 06/02/2022 07/02/2022 2.00 2.00 12.22 24.44 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12.22 12.22 0 0 0 24.45.811832 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.128 23.05.02.04.02 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #8 AWG + GRD, XHHW-2, 0 m 0.00% 0.03704 7.78 06/02/2022 07/02/2022 2.00 2.00 3.89 7.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.89 3.89 0 0 0 7.782.245308 1.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.129 23.05.02.05 S5 IE ILUMINACION EXTERIOR 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.130 23.05.02.05.01 S5 IE SUMINISTRO Y MONTAJE DE POSTE METÁLICO DE 12m DE ALTURA UND 0.00% 0.03704 1.00 05/02/2022 05/02/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 61.44 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.131 23.05.02.05.02 S5 IE PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 0.00% 0.03704 0.04 05/02/2022 05/02/2022 1.00 1.00 0.04 0.04 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.04 0 0 0 0 0 0.04 8.16 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.132 23.05.02 S5 IE REFLECTORES 04 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.133 23.05.02.01 S5 IE SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.134 23.05.02.01.01 S5 IE SUMINISTRO Y MONTAJE DE EQUIPO FLUORESCENTE HOLOPHANE PM pto 0.00% 0.07407 2.00 06/02/2022 06/02/2022 1.00 1.00 2.00 2.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 2 16 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.135 23.05.02.02 S5 IE TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.136 23.05.02.02.01 S5 IE SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE UND 0.00% 0.07407 1.00 06/02/2022 06/02/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 1.3767 1.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.137 23.05.02.03 S5 IE CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.138 23.05.02.03.01 S5 IE SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.07407 14.67 06/02/2022 07/02/2022 2.00 2.00 7.34 14.67 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.335 7.335 0 0 0 14.7 8.33256 1.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.139 23.05.02.03.02 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.07407 9.63 06/02/2022 07/02/2022 2.00 2.00 4.82 9.63 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.815 4.815 0 0 0 9.637.703037 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.140 23.05.02.03.03 S5 IE SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 0.07407 11.19 06/02/2022 07/02/2022 2.00 2.00 5.60 11.19 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.595 5.595 0 0 0 11.2 10.7424 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.141 23.05.02.03.04 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 0.07407 4.37 06/02/2022 07/02/2022 2.00 2.00 2.19 4.37 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.185 2.185 0 0 0 4.37 5.31392 1.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.142 23.05.02.03.05 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.07407 15.56 06/02/2022 07/02/2022 2.00 2.00 7.78 15.56 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.78 7.78 0 0 0 15.614.04912 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.143 23.05.02.04 S5 IE CONDUCTORES Y CABLES DE ENERGIA 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.144 23.05.02.04.01 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #8 AWG + GRD; XHHW-2, 0 m 0.00% 0.07407 48.89 06/02/2022 07/02/2022 2.00 2.00 24.45 48.89 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24.445 24.445 0 0 0 48.911.62604 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.145 23.05.02.04.02 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #8 AWG + GRD, XHHW-2, 0 m 0.00% 0.07407 15.56 06/02/2022 07/02/2022 2.00 2.00 7.78 15.56 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.78 7.78 0 0 0 15.64.490616 1.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.146 23.05.02.05 S5 IE ILUMINACION EXTERIOR 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.147 23.05.02.05.01 S5 IE SUMINISTRO Y MONTAJE DE POSTE METÁLICO DE 12m DE ALTURA UND 0.00% 0.07407 1.00 05/02/2022 05/02/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 61.44 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.148 23.05.02.05.02 S5 IE PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 0.00% 0.07407 0.07 05/02/2022 05/02/2022 1.00 1.00 0.07 0.07 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.07 0 0 0 0 0 0.07 14.28 0.95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.149 23.05.02 S5 IE REFLECTORES 05 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.150 23.05.02.01 S5 IE SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.151 23.05.02.01.01 S5 IE SUMINISTRO Y MONTAJE DE EQUIPO FLUORESCENTE HOLOPHANE PM pto 0.00% 0.11111 3.00 06/02/2022 06/02/2022 1.00 1.00 3.00 3.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 3 24 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.152 23.05.02.02 S5 IE TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.153 23.05.02.02.01 S5 IE SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE UND 0.00% 0.11111 1.00 06/02/2022 06/02/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 1.3767 1.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.154 23.05.02.03 S5 IE CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.155 23.05.02.03.01 S5 IE SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.11111 22.00 06/02/2022 07/02/2022 2.00 2.00 11.00 22.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 11 0 0 0 22 12.496 1.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.156 23.05.02.03.02 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.11111 14.44 06/02/2022 07/02/2022 2.00 2.00 7.22 14.44 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.22 7.22 0 0 0 14.411.55056 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.157 23.05.02.03.03 S5 IE SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 0.11111 16.78 06/02/2022 07/02/2022 2.00 2.00 8.39 16.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.39 8.39 0 0 0 16.8 16.1088 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.158 23.05.02.03.04 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 0.11111 6.56 06/02/2022 07/02/2022 2.00 2.00 3.28 6.56 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.28 3.28 0 0 0 6.56 7.97696 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.159 23.05.02.03.05 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.11111 23.33 06/02/2022 07/02/2022 2.00 2.00 11.67 23.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11.665 11.665 0 0 0 23.321.06466 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.160 23.05.02.04 S5 IE CONDUCTORES Y CABLES DE ENERGIA 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.161 23.05.02.04.01 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #8 AWG + GRD; XHHW-2, 0 m 0.00% 0.11111 73.33 06/02/2022 07/02/2022 2.00 2.00 36.67 73.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 36.665 36.665 0 0 0 73.317.43787 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.162 23.05.02.04.02 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #8 AWG + GRD, XHHW-2, 0 m 0.00% 0.11111 23.33 06/02/2022 07/02/2022 2.00 2.00 11.67 23.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11.665 11.665 0 0 0 23.36.733038 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.163 23.05.02.05 S5 IE ILUMINACION EXTERIOR 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.164 23.05.02.05.01 S5 IE SUMINISTRO Y MONTAJE DE POSTE METÁLICO DE 12m DE ALTURA UND 0.00% 0.11111 1.00 05/02/2022 05/02/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 61.44 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.165 23.05.02.05.02 S5 IE PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 0.00% 0.11111 0.11 05/02/2022 05/02/2022 1.00 1.00 0.11 0.11 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.11 0 0 0 0 0 0.11 22.44 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.166 23.05.02 S5 IE REFLECTORES 06 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.167 23.05.02.01 S5 IE SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.168 23.05.02.01.01 S5 IE SUMINISTRO Y MONTAJE DE EQUIPO FLUORESCENTE HOLOPHANE PM pto 0.00% 0.03704 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.169 23.05.02.02 S5 IE TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.170 23.05.02.02.01 S5 IE SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE UND 0.00% 0.03704 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 1.3767 1.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.171 23.05.02.03 S5 IE CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.172 23.05.02.03.01 S5 IE SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.03704 7.33 15/01/2022 16/01/2022 2.00 2.00 3.67 7.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.665 3.665 0 0 0 0 7.33 4.16344 1.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.173 23.05.02.03.02 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.03704 4.81 15/01/2022 16/01/2022 2.00 2.00 2.41 4.81 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.405 2.405 0 0 0 0 4.81 3.847519 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.174 23.05.02.03.03 S5 IE SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 0.03704 5.59 15/01/2022 16/01/2022 2.00 2.00 2.80 5.59 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.795 2.795 0 0 0 0 5.59 5.3664 1.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.175 23.05.02.03.04 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 0.03704 2.19 15/01/2022 16/01/2022 2.00 2.00 1.10 2.19 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.095 1.095 0 0 0 0 2.19 2.66304 0.89 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.176 23.05.02.03.05 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.03704 7.78 15/01/2022 16/01/2022 2.00 2.00 3.89 7.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.89 3.89 0 0 0 0 7.78 7.024562 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.177 23.05.02.04 S5 IE CONDUCTORES Y CABLES DE ENERGIA 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.178 23.05.02.04.01 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #8 AWG + GRD; XHHW-2, 0 m 0.00% 0.03704 24.44 15/01/2022 16/01/2022 2.00 2.00 12.22 24.44 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12.22 12.22 0 0 0 0 24.4 5.811832 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.179 23.05.02.04.02 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #8 AWG + GRD, XHHW-2, 0 m 0.00% 0.03704 7.78 15/01/2022 16/01/2022 2.00 2.00 3.89 7.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.89 3.89 0 0 0 0 7.78 2.245308 1.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.180 23.05.02.05 S5 IE ILUMINACION EXTERIOR 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.181 23.05.02.05.01 S5 IE SUMINISTRO Y MONTAJE DE POSTE METÁLICO DE 12m DE ALTURA UND 0.00% 0.03704 1.00 14/01/2022 14/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 61.44 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.182 23.05.02.05.02 S5 IE PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 0.00% 0.03704 0.04 14/01/2022 14/01/2022 1.00 1.00 0.04 0.04 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.04 0 0 0 0 0 0 0.04 8.16 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.183 23.05.02 S5 IE REFLECTORES 07 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.184 23.05.02.01 S5 IE SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.185 23.05.02.01.01 S5 IE SUMINISTRO Y MONTAJE DE EQUIPO FLUORESCENTE HOLOPHANE PM pto 0.00% 0.07407 2.00 15/01/2022 15/01/2022 1.00 1.00 2.00 2.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 2 16 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.186 23.05.02.02 S5 IE TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.187 23.05.02.02.01 S5 IE SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE UND 0.00% 0.07407 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 1.3767 1.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.188 23.05.02.03 S5 IE CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.189 23.05.02.03.01 S5 IE SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.07407 14.67 15/01/2022 16/01/2022 2.00 2.00 7.34 14.67 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.335 7.335 0 0 0 0 14.7 8.33256 1.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.190 23.05.02.03.02 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.07407 9.63 15/01/2022 16/01/2022 2.00 2.00 4.82 9.63 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.815 4.815 0 0 0 0 9.63 7.703037 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.191 23.05.02.03.03 S5 IE SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 0.07407 11.19 15/01/2022 16/01/2022 2.00 2.00 5.60 11.19 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.595 5.595 0 0 0 0 11.2 10.7424 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.192 23.05.02.03.04 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 0.07407 4.37 15/01/2022 16/01/2022 2.00 2.00 2.19 4.37 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.185 2.185 0 0 0 0 4.37 5.31392 1.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.193 23.05.02.03.05 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.07407 15.56 15/01/2022 16/01/2022 2.00 2.00 7.78 15.56 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.78 7.78 0 0 0 0 15.6 14.04912 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.194 23.05.02.04 S5 IE CONDUCTORES Y CABLES DE ENERGIA 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.195 23.05.02.04.01 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #8 AWG + GRD; XHHW-2, 0 m 0.00% 0.07407 48.89 15/01/2022 16/01/2022 2.00 2.00 24.45 48.89 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24.445 24.445 0 0 0 0 48.9 11.62604 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.196 23.05.02.04.02 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #8 AWG + GRD, XHHW-2, 0 m 0.00% 0.07407 15.56 15/01/2022 16/01/2022 2.00 2.00 7.78 15.56 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.78 7.78 0 0 0 0 15.6 4.490616 1.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.197 23.05.02.05 S5 IE ILUMINACION EXTERIOR 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.198 23.05.02.05.01 S5 IE SUMINISTRO Y MONTAJE DE POSTE METÁLICO DE 12m DE ALTURA UND 0.00% 0.07407 1.00 14/01/2022 14/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 61.44 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.199 23.05.02.05.02 S5 IE PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 0.00% 0.07407 0.07 14/01/2022 14/01/2022 1.00 1.00 0.07 0.07 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.07 0 0 0 0 0 0 0.07 14.28 0.95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.200 23.05.02 S5 IE REFLECTORES 08 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.201 23.05.02.01 S5 IE SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.202 23.05.02.01.01 S5 IE SUMINISTRO Y MONTAJE DE EQUIPO FLUORESCENTE HOLOPHANE PM pto 0.00% 0.03704 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.203 23.05.02.02 S5 IE TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.204 23.05.02.02.01 S5 IE SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE UND 0.00% 0.03704 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 1.3767 1.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.205 23.05.02.03 S5 IE CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.206 23.05.02.03.01 S5 IE SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.03704 7.33 15/01/2022 16/01/2022 2.00 2.00 3.67 7.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.665 3.665 0 0 0 0 7.33 4.16344 1.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.207 23.05.02.03.02 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.03704 4.81 15/01/2022 16/01/2022 2.00 2.00 2.41 4.81 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.405 2.405 0 0 0 0 4.81 3.847519 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.208 23.05.02.03.03 S5 IE SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 0.03704 5.59 15/01/2022 16/01/2022 2.00 2.00 2.80 5.59 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.795 2.795 0 0 0 0 5.59 5.3664 1.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.209 23.05.02.03.04 S5 IE
2407.220 23.05.02.02 S5 IE TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.221 23.05.02.02.01 S5 IE SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE UND 0.00% 0.11111 1.00 14/01/2022 14/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 1.3767 1.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.222 23.05.02.03 S5 IE CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.223 23.05.02.03.01 S5 IE SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.11111 22.00 14/01/2022 15/01/2022 2.00 2.00 11.00 22.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 11 0 0 0 0 0 22 12.496 1.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.224 23.05.02.03.02 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.11111 14.44 14/01/2022 15/01/2022 2.00 2.00 7.22 14.44 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.22 7.22 0 0 0 0 0 14.4 11.55056 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.225 23.05.02.03.03 S5 IE SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 0.11111 16.78 14/01/2022 15/01/2022 2.00 2.00 8.39 16.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.39 8.39 0 0 0 0 0 16.8 16.1088 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.226 23.05.02.03.04 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 0.11111 6.56 14/01/2022 15/01/2022 2.00 2.00 3.28 6.56 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.28 3.28 0 0 0 0 0 6.56 7.97696 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.227 23.05.02.03.05 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.11111 23.33 14/01/2022 15/01/2022 2.00 2.00 11.67 23.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11.665 11.665 0 0 0 0 0 23.3 21.06466 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.228 23.05.02.04 S5 IE CONDUCTORES Y CABLES DE ENERGIA 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.229 23.05.02.04.01 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #8 AWG + GRD; XHHW-2, 0 m 0.00% 0.11111 73.33 14/01/2022 15/01/2022 2.00 2.00 36.67 73.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 36.665 36.665 0 0 0 0 0 73.3 17.43787 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.230 23.05.02.04.02 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #8 AWG + GRD, XHHW-2, 0 m 0.00% 0.11111 23.33 14/01/2022 15/01/2022 2.00 2.00 11.67 23.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11.665 11.665 0 0 0 0 0 23.3 6.733038 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.231 23.05.02.05 S5 IE ILUMINACION EXTERIOR 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.232 23.05.02.05.01 S5 IE SUMINISTRO Y MONTAJE DE POSTE METÁLICO DE 12m DE ALTURA UND 0.00% 0.11111 1.00 07/02/2022 07/02/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 61.44 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.233 23.05.02.05.02 S5 IE PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 0.00% 0.11111 0.11 07/02/2022 07/02/2022 1.00 1.00 0.11 0.11 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.11 0 0 0 0.11 22.44 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.234 23.05.02 S5 IE REFLECTORES 10 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.235 23.05.02.01 S5 IE SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.236 23.05.02.01.01 S5 IE SUMINISTRO Y MONTAJE DE EQUIPO FLUORESCENTE HOLOPHANE PM pto 0.00% 0.07407 2.00 15/01/2022 15/01/2022 1.00 1.00 2.00 2.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 2 16 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.237 23.05.02.02 S5 IE TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.238 23.05.02.02.01 S5 IE SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE UND 0.00% 0.07407 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 1.3767 1.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.239 23.05.02.03 S5 IE CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.240 23.05.02.03.01 S5 IE SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.07407 14.67 15/01/2022 16/01/2022 2.00 2.00 7.34 14.67 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.335 7.335 0 0 0 0 14.7 8.33256 1.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.241 23.05.02.03.02 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.07407 9.63 15/01/2022 16/01/2022 2.00 2.00 4.82 9.63 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.815 4.815 0 0 0 0 9.63 7.703037 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.242 23.05.02.03.03 S5 IE SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 0.07407 11.19 15/01/2022 16/01/2022 2.00 2.00 5.60 11.19 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.595 5.595 0 0 0 0 11.2 10.7424 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.243 23.05.02.03.04 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 0.07407 4.37 15/01/2022 16/01/2022 2.00 2.00 2.19 4.37 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.185 2.185 0 0 0 0 4.37 5.31392 1.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.244 23.05.02.03.05 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.07407 15.56 15/01/2022 16/01/2022 2.00 2.00 7.78 15.56 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.78 7.78 0 0 0 0 15.6 14.04912 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.245 23.05.02.04 S5 IE CONDUCTORES Y CABLES DE ENERGIA 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.246 23.05.02.04.01 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #8 AWG + GRD; XHHW-2, 0 m 0.00% 0.07407 48.89 15/01/2022 16/01/2022 2.00 2.00 24.45 48.89 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24.445 24.445 0 0 0 0 48.9 11.62604 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.247 23.05.02.04.02 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #8 AWG + GRD, XHHW-2, 0 m 0.00% 0.07407 15.56 15/01/2022 16/01/2022 2.00 2.00 7.78 15.56 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.78 7.78 0 0 0 0 15.6 4.490616 1.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.248 23.05.02.05 S5 IE ILUMINACION EXTERIOR 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.249 23.05.02.05.01 S5 IE SUMINISTRO Y MONTAJE DE POSTE METÁLICO DE 12m DE ALTURA UND 0.00% 0.07407 1.00 14/01/2022 14/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 61.44 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.250 23.05.02.05.02 S5 IE PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 0.00% 0.07407 0.07 14/01/2022 14/01/2022 1.00 1.00 0.07 0.07 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.07 0 0 0 0 0 0 0.07 14.28 0.95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.251 23.05.02 S5 IE REFLECTORES 11 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.252 23.05.02.01 S5 IE SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.253 23.05.02.01.01 S5 IE SUMINISTRO Y MONTAJE DE EQUIPO FLUORESCENTE HOLOPHANE PM pto 0.00% 0.03704 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.254 23.05.02.02 S5 IE TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.255 23.05.02.02.01 S5 IE SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE UND 0.00% 0.03704 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 1.3767 1.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.256 23.05.02.03 S5 IE CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.257 23.05.02.03.01 S5 IE SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.03704 7.33 15/01/2022 16/01/2022 2.00 2.00 3.67 7.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.665 3.665 0 0 0 0 7.33 4.16344 1.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.258 23.05.02.03.02 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.03704 4.81 15/01/2022 16/01/2022 2.00 2.00 2.41 4.81 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.405 2.405 0 0 0 0 4.81 3.847519 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.259 23.05.02.03.03 S5 IE SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 0.03704 5.59 15/01/2022 16/01/2022 2.00 2.00 2.80 5.59 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.795 2.795 0 0 0 0 5.59 5.3664 1.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.260 23.05.02.03.04 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 0.03704 2.19 15/01/2022 16/01/2022 2.00 2.00 1.10 2.19 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.095 1.095 0 0 0 0 2.19 2.66304 0.89 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.261 23.05.02.03.05 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.03704 7.78 15/01/2022 16/01/2022 2.00 2.00 3.89 7.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.89 3.89 0 0 0 0 7.78 7.024562 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.262 23.05.02.04 S5 IE CONDUCTORES Y CABLES DE ENERGIA 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.263 23.05.02.04.01 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #8 AWG + GRD; XHHW-2, 0 m 0.00% 0.03704 24.44 15/01/2022 16/01/2022 2.00 2.00 12.22 24.44 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12.22 12.22 0 0 0 0 24.4 5.811832 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.264 23.05.02.04.02 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #8 AWG + GRD, XHHW-2, 0 m 0.00% 0.03704 7.78 15/01/2022 16/01/2022 2.00 2.00 3.89 7.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.89 3.89 0 0 0 0 7.78 2.245308 1.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.265 23.05.02.05 S5 IE ILUMINACION EXTERIOR 0.03704 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.266 23.05.02.05.01 S5 IE SUMINISTRO Y MONTAJE DE POSTE METÁLICO DE 12m DE ALTURA UND 0.00% 0.03704 1.00 14/01/2022 14/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 61.44 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.267 23.05.02.05.02 S5 IE PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 0.00% 0.03704 0.04 14/01/2022 14/01/2022 1.00 1.00 0.04 0.04 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.04 0 0 0 0 0 0 0.04 8.16 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.268 23.05.02 S5 IE REFLECTORES 12 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.269 23.05.02.01 S5 IE SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.270 23.05.02.01.01 S5 IE SUMINISTRO Y MONTAJE DE EQUIPO FLUORESCENTE HOLOPHANE PM pto 0.00% 0.11111 3.00 15/01/2022 15/01/2022 1.00 1.00 3.00 3.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 3 24 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.271 23.05.02.02 S5 IE TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.272 23.05.02.02.01 S5 IE SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE UND 0.00% 0.11111 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 1.3767 1.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.273 23.05.02.03 S5 IE CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.274 23.05.02.03.01 S5 IE SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.11111 22.00 15/01/2022 16/01/2022 2.00 2.00 11.00 22.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 11 0 0 0 0 22 12.496 1.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.275 23.05.02.03.02 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.11111 14.44 15/01/2022 16/01/2022 2.00 2.00 7.22 14.44 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.22 7.22 0 0 0 0 14.4 11.55056 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.276 23.05.02.03.03 S5 IE SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 0.11111 16.78 15/01/2022 16/01/2022 2.00 2.00 8.39 16.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.39 8.39 0 0 0 0 16.8 16.1088 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.277 23.05.02.03.04 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 0.11111 6.56 15/01/2022 16/01/2022 2.00 2.00 3.28 6.56 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.28 3.28 0 0 0 0 6.56 7.97696 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.278 23.05.02.03.05 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.11111 23.33 15/01/2022 16/01/2022 2.00 2.00 11.67 23.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11.665 11.665 0 0 0 0 23.3 21.06466 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.279 23.05.02.04 S5 IE CONDUCTORES Y CABLES DE ENERGIA 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.280 23.05.02.04.01 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #8 AWG + GRD; XHHW-2, 0 m 0.00% 0.11111 73.33 15/01/2022 16/01/2022 2.00 2.00 36.67 73.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 36.665 36.665 0 0 0 0 73.3 17.43787 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.281 23.05.02.04.02 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #8 AWG + GRD, XHHW-2, 0 m 0.00% 0.11111 23.33 15/01/2022 16/01/2022 2.00 2.00 11.67 23.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11.665 11.665 0 0 0 0 23.3 6.733038 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.282 23.05.02.05 S5 IE ILUMINACION EXTERIOR 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.283 23.05.02.05.01 S5 IE SUMINISTRO Y MONTAJE DE POSTE METÁLICO DE 12m DE ALTURA UND 0.00% 0.11111 1.00 14/01/2022 14/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 61.44 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.284 23.05.02.05.02 S5 IE PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 0.00% 0.11111 0.11 14/01/2022 14/01/2022 1.00 1.00 0.11 0.11 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.11 0 0 0 0 0 0 0.11 22.44 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.285 23.05.02 S5 IE REFLECTORES 13 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.286 23.05.02.01 S5 IE SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.287 23.05.02.01.01 S5 IE SUMINISTRO Y MONTAJE DE EQUIPO FLUORESCENTE HOLOPHANE PM pto 0.00% 0.07407 2.00 15/01/2022 15/01/2022 1.00 1.00 2.00 2.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 2 16 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.288 23.05.02.02 S5 IE TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.289 23.05.02.02.01 S5 IE SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE UND 0.00% 0.07407 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 1.3767 1.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.290 23.05.02.03 S5 IE CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.291 23.05.02.03.01 S5 IE SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.07407 14.67 15/01/2022 16/01/2022 2.00 2.00 7.34 14.67 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.335 7.335 0 0 0 0 14.7 8.33256 1.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.292 23.05.02.03.02 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.07407 9.63 15/01/2022 16/01/2022 2.00 2.00 4.82 9.63 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.815 4.815 0 0 0 0 9.63 7.703037 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.293 23.05.02.03.03 S5 IE SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 0.07407 11.19 15/01/2022 16/01/2022 2.00 2.00 5.60 11.19 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.595 5.595 0 0 0 0 11.2 10.7424 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.294 23.05.02.03.04 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 0.07407 4.37 15/01/2022 16/01/2022 2.00 2.00 2.19 4.37 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.185 2.185 0 0 0 0 4.37 5.31392 1.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.295 23.05.02.03.05 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.07407 15.56 15/01/2022 16/01/2022 2.00 2.00 7.78 15.56 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.78 7.78 0 0 0 0 15.6 14.04912 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.296 23.05.02.04 S5 IE CONDUCTORES Y CABLES DE ENERGIA 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.297 23.05.02.04.01 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #8 AWG + GRD; XHHW-2, 0 m 0.00% 0.07407 48.89 15/01/2022 16/01/2022 2.00 2.00 24.45 48.89 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24.445 24.445 0 0 0 0 48.9 11.62604 0.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.298 23.05.02.04.02 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #8 AWG + GRD, XHHW-2, 0 m 0.00% 0.07407 15.56 15/01/2022 16/01/2022 2.00 2.00 7.78 15.56 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.78 7.78 0 0 0 0 15.6 4.490616 1.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.299 23.05.02.05 S5 IE ILUMINACION EXTERIOR 0.07407 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.300 23.05.02.05.01 S5 IE SUMINISTRO Y MONTAJE DE POSTE METÁLICO DE 12m DE ALTURA UND 0.00% 0.07407 1.00 14/01/2022 14/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 61.44 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.301 23.05.02.05.02 S5 IE PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 0.00% 0.07407 0.07 14/01/2022 14/01/2022 1.00 1.00 0.07 0.07 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.07 0 0 0 0 0 0 0.07 14.28 0.95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.302 23.05.02 S5 IE REFLECTORES 14 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.303 23.05.02.01 S5 IE SALIDAS PARA ALUMBRADO Y TOMACORRIENTES 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.304 23.05.02.01.01 S5 IE SUMINISTRO Y MONTAJE DE EQUIPO FLUORESCENTE HOLOPHANE PM pto 0.00% 0.11111 3.00 15/01/2022 15/01/2022 1.00 1.00 3.00 3.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 3 24 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.305 23.05.02.02 S5 IE TABLEROS ELECTRICOS Y CAJAS DE CONEXIÓN Y/O DERIVACIÓN 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.306 23.05.02.02.01 S5 IE SUMINISTRO Y MONTAJE DE CAJAS DE CONEXIÓN Y/O DERIVACIÓN DE UND 0.00% 0.11111 1.00 15/01/2022 15/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 1.3767 1.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.307 23.05.02.03 S5 IE CANALIZACIONES, CONDUCTOS Y TUBERÍAS 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.308 23.05.02.03.01 S5 IE SUMINISTRO E INSTALACION DE TUBERIA PVC SCH40 Ø2" m 0.00% 0.11111 22.00 15/01/2022 16/01/2022 2.00 2.00 11.00 22.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 11 0 0 0 0 22 12.496 1.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.309 23.05.02.03.02 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA HDPE SDR 11 Ø2" m 0.00% 0.11111 14.44 15/01/2022 16/01/2022 2.00 2.00 7.22 14.44 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.22 7.22 0 0 0 0 14.4 11.55056 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.310 23.05.02.03.03 S5 IE SUMINISTRO E INSTALACION DE TUBERIA HDPE SDR 11 Ø3" m 0.00% 0.11111 16.78 15/01/2022 16/01/2022 2.00 2.00 8.39 16.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.39 8.39 0 0 0 0 16.8 16.1088 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.311 23.05.02.03.04 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA RGS 2"Ø m 0.00% 0.11111 6.56 15/01/2022 16/01/2022 2.00 2.00 3.28 6.56 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.28 3.28 0 0 0 0 6.56 7.97696 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.312 23.05.02.03.05 S5 IE SUMINISTRO E INSTALACIÓN DE TUBERÍA FLEXIBLE RGS 3/4" m 0.00% 0.11111 23.33 15/01/2022 16/01/2022 2.00 2.00 11.67 23.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11.665 11.665 0 0 0 0 23.3 21.06466 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.313 23.05.02.04 S5 IE CONDUCTORES Y CABLES DE ENERGIA 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.314 23.05.02.04.01 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-4/c #8 AWG + GRD; XHHW-2, 0 m 0.00% 0.11111 73.33 15/01/2022 16/01/2022 2.00 2.00 36.67 73.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 36.665 36.665 0 0 0 0 73.3 17.43787 1.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.315 23.05.02.04.02 S5 IE SUMINISTRO E INSTALACIÓN DE CABLE 1-2/c #8 AWG + GRD, XHHW-2, 0 m 0.00% 0.11111 23.33 15/01/2022 16/01/2022 2.00 2.00 11.67 23.33 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11.665 11.665 0 0 0 0 23.3 6.733038 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.316 23.05.02.05 S5 IE ILUMINACION EXTERIOR 0.11111 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2407.317 23.05.02.05.01 S5 IE SUMINISTRO Y MONTAJE DE POSTE METÁLICO DE 12m DE ALTURA UND 0.00% 0.11111 1.00 14/01/2022 14/01/2022 1.00 1.00 1.00 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 61.44 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2407.318 23.05.02.05.02 S5 IE PRUEBAS Y PUESTA EN SERVICIO DEL SERVICIO DE ALUMBRADO GLB 0.00% 0.11111 0.11 14/01/2022 14/01/2022 1.00 1.00 0.11 0.11 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.11 0 0 0 0 0 0 0.11 22.44 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.1 24 S5 SPT SISTEMA DE PUESTA A TIERRA - SECTOR 1: B, C, D, E 0.15 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.2 24.01 S5 SPT DISCIPLINA: CIVIL 0.15 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.3 24.01.01 S5 SPT MOVIMIENTO DE TIERRAS PARA SISTEMA DE PUESTA A TIERRA Y PROTECCION ATMOSFERICA 0.15 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.4 24.01.01.01 S5 SPT EXCAVACIÓN PARA MALLAS Y POZOS DE PUESTA A TIERRA m3 89.72% 0.15 11.80 24/12/2021 06/01/2022 14.00 14.00 0.84 11.80 X 0 0 0 0 0 0 0 0 0.00 0 0.8429 0.8429 0.8429 0.8429 0.8429 0.8429 0.8429 5.9 36.58 0.05 0.8429 0.8429 0.8429 0.8429 0.8429 0.8429 0.8429 5.9 36.58 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.5 24.01.01.02 S5 SPT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 89.72% 0.15 5.95 24/12/2021 06/01/2022 14.00 14.00 0.43 5.95 X 0 0 0 0 0 0 0 0 0.00 0 0.425 0.425 0.425 0.425 0.425 0.425 0.425 2.98 6.024375 0.05 0.425 0.425 0.425 0.425 0.425 0.425 0.425 2.98 6.024375 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.6 24.01.01.03 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 89.71% 0.15 5.34 24/12/2021 06/01/2022 14.00 14.00 0.38 5.34 X 0 0 0 0 0 0 0 0 0.00 0 0.3814 0.3814 0.3814 0.3814 0.3814 0.3814 0.3814 2.67 0.41385 0.05 0.3814 0.3814 0.3814 0.3814 0.3814 0.3814 0.3814 2.67 0.41385 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.7 24.01.01.04 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 89.72% 0.15 30.89 24/12/2021 06/01/2022 14.00 14.00 2.21 30.89 X 0 0 0 0 0 0 0 0 0.00 0 2.2064 2.2064 2.2064 2.2064 2.2064 2.2064 2.2064 15.4 0.5663167 0.05 2.2064 2.2064 2.2064 2.2064 2.2064 2.2064 2.2064 15.4 0.5663167 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.8 24.01.01.05 S5 SPT RELLENO PARA MALLAS Y POZOS DE PUESTA A TIERRA CON TOP SOI m3 89.72% 0.15 4.10 24/12/2021 06/01/2022 14.00 14.00 0.29 4.10 X 0 0 0 0 0 0 0 0 0.00 0 0.2929 0.2929 0.2929 0.2929 0.2929 0.2929 0.2929 2.05 5.535 0.05 0.2929 0.2929 0.2929 0.2929 0.2929 0.2929 0.2929 2.05 5.535 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.9 24.01.01.06 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 89.71% 0.15 7.31 24/12/2021 06/01/2022 14.00 14.00 0.52 7.31 X 0 0 0 0 0 0 0 0 0.00 0 0.5221 0.5221 0.5221 0.5221 0.5221 0.5221 0.5221 3.66 0.419594 0.05 0.5221 0.5221 0.5221 0.5221 0.5221 0.5221 0.5221 3.66 0.419594 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.10 24.01.01.07 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 89.72% 0.15 14.61 24/12/2021 06/01/2022 14.00 14.00 1.04 14.61 X 0 0 0 0 0 0 0 0 0.00 0 1.0436 1.0436 1.0436 1.0436 1.0436 1.0436 1.0436 7.31 0.3411435 0.05 1.0436 1.0436 1.0436 1.0436 1.0436 1.0436 1.0436 7.31 0.3411435 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.11 24.01.01.08 S5 SPT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 89.71% 0.15 7.31 24/12/2021 06/01/2022 14.00 14.00 0.52 7.31 X 0 0 0 0 0 0 0 0 0.00 0 0.5221 0.5221 0.5221 0.5221 0.5221 0.5221 0.5221 3.66 0.8583712 0.05 0.5221 0.5221 0.5221 0.5221 0.5221 0.5221 0.5221 3.66 0.8583712 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.12 24.02 S5 SPT DISCIPLINA: INSTALACIONES ELÉCTRICAS 0.15 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.13 24.02.01 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 120 M m 67.04% 0.15 154.15 31/12/2021 13/01/2022 14.00 14.00 11.01 154.15 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 11.011 11.011 11.011 11.011 11.011 11.011 11.011 77.1 62.43075 0.16 11.011 11.011 11.011 11.011 11.011 11.011 11.011 77.075 62.43075 0.16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.14 24.02.02 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE THHN/THWN CO m 66.39% 0.15 17.79 31/12/2021 13/01/2022 14.00 14.00 1.27 17.79 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 1.2707 1.2707 1.2707 1.2707 1.2707 1.2707 1.2707 8.9 5.76396 0.17 1.2707 1.2707 1.2707 1.2707 1.2707 1.2707 1.2707 8.895 5.76396 0.17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.15 24.02.03 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 16 m 65.99% 0.15 1.48 31/12/2021 13/01/2022 14.00 14.00 0.11 1.48 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1057 0.1057 0.1057 0.1057 0.1057 0.1057 0.1057 0.74 0.383616 0.19 0.1057 0.1057 0.1057 0.1057 0.1057 0.1057 0.1057 0.74 0.383616 0.19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.16 24.02.04 S5 SPT SUMINISTRO E INSTALACIÓN DE CINTA SEÑALIZADORA PARA CONDUCTO m 3.10% 0.15 453.20 31/12/2021 13/01/2022 14.00 14.00 32.37 453.20 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 32.371 32.371 32.371 32.371 32.371 32.371 32.371 227 20.394 0.49 32.371 32.371 32.371 32.371 32.371 32.371 32.371 226.6 20.394 0.49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.17 24.02.05 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.15 17.25 20/01/2022 26/01/2022 7.00 7.00 2.46 17.25 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.4643 2.46 1.051264 0.15 2.4643 2.4643 2.4643 2.4643 2.4643 2.4643 0 14.8 6.307586 0.9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.18 24.02.06 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 0.45 20/01/2022 26/01/2022 7.00 7.00 0.06 0.45 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0643 0.06 5.914286 0.14 0.0643 0.0643 0.0643 0.0643 0.0643 0.0643 0 0.39 35.48571 0.87 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.19 24.02.07 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 3.30 20/01/2022 26/01/2022 7.00 7.00 0.47 3.30 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4714 0.47 34.69714 0.14 0.4714 0.4714 0.4714 0.4714 0.4714 0.4714 0 2.83 208.1829 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.20 24.02.08 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 1.50 20/01/2022 26/01/2022 7.00 7.00 0.21 1.50 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2143 0.21 0.308571 0.15 0.2143 0.2143 0.2143 0.2143 0.2143 0.2143 0 1.29 1.851429 0.93 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.21 24.02.09 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 0.90 20/01/2022 26/01/2022 7.00 7.00 0.13 0.90 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1286 0.13 0.131657 0.13 0.1286 0.1286 0.1286 0.1286 0.1286 0.1286 0 0.77 0.789943 0.79 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.22 24.02.10 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.15 0.30 20/01/2022 26/01/2022 7.00 7.00 0.04 0.30 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0429 0.04 0.274286 0.14 0.0429 0.0429 0.0429 0.0429 0.0429 0.0429 0 0.26 1.645714 0.82 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.23 24.02.11 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 4.65 20/01/2022 26/01/2022 7.00 7.00 0.66 4.65 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.6643 0.66 0.983143 0.14 0.6643 0.6643 0.6643 0.6643 0.6643 0.6643 0 3.99 5.898857 0.84 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.24 24.02.12 S5 SPT SUMINISTRO E INSTALACIÓN DE CONEXIÓN CON SOLDADURA EXOTÉRMI GLB 0.00% 0.15 0.15 20/01/2022 26/01/2022 7.00 7.00 0.02 0.15 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0.0214 0.02 0.027429 ### 0.0214 0.0214 0.0214 0.0214 0.0214 0.0214 0 0.13 0.164571 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.25 24.02.13 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 0.90 20/01/2022 26/01/2022 7.00 7.00 0.13 0.90 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1286 0.13 0.25371 0.13 0.1286 0.1286 0.1286 0.1286 0.1286 0.1286 0 0.77 1.52226 0.76 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.26 24.02.14 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 2.10 20/01/2022 26/01/2022 7.00 7.00 0.30 2.10 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3 0.3 0.74001 0.15 0.3 0.3 0.3 0.3 0.3 0.3 0 1.8 4.44006 0.89 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.27 24.02.15 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 14.25 20/01/2022 26/01/2022 7.00 7.00 2.04 14.25 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.0357 2.04 3.766071 0.14 2.0357 2.0357 2.0357 2.0357 2.0357 2.0357 0 12.2 22.59643 0.87 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.28 24.02.16 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.15 0.60 20/01/2022 26/01/2022 7.00 7.00 0.09 0.60 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0857 0.09 0.14094 0.14 0.0857 0.0857 0.0857 0.0857 0.0857 0.0857 0 0.51 0.84564 0.85 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.29 24.02.17 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 1.50 20/01/2022 26/01/2022 7.00 7.00 0.21 1.50 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2143 0.21 0.317143 0.16 0.2143 0.2143 0.2143 0.2143 0.2143 0.2143 0 1.29 1.902857 0.95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.30 24 S5 SPT SISTEMA DE PUESTA A TIERRA - SECTOR 2: A, T 0.15 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.31 24.01 S5 SPT DISCIPLINA: CIVIL 0.15 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.32 24.01.01 S5 SPT MOVIMIENTO DE TIERRAS PARA SISTEMA DE PUESTA A TIERRA Y PROTECCION ATMOSFERICA 0.15 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.33 24.01.01.01 S5 SPT EXCAVACIÓN PARA MALLAS Y POZOS DE PUESTA A TIERRA m3 96.91% 0.15 3.54 17/12/2021 26/12/2021 10.00 10.00 0.35 3.54 X 0.354 0.354 0.354 0.354 0.354 0.354 0.354 2.48 15.36 0.02 0.354 0.354 0.354 0 0 0 0 1.06 6.5844 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.34 24.01.01.02 S5 SPT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 96.91% 0.15 1.79 17/12/2021 26/12/2021 10.00 10.00 0.18 1.79 X 0.179 0.179 0.179 0.179 0.179 0.179 0.179 1.25 2.54 0.02 0.179 0.179 0.179 0 0 0 0 0.54 1.087425 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.35 24.01.01.03 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 96.92% 0.15 1.60 17/12/2021 26/12/2021 10.00 10.00 0.16 1.60 X 0.16 0.16 0.16 0.16 0.16 0.16 0.16 1.12 0.17 0.02 0.16 0.16 0.16 0 0 0 0 0.48 0.0744 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.36 24.01.01.04 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 96.92% 0.15 9.26 17/12/2021 26/12/2021 10.00 10.00 0.93 9.26 X 0.926 0.926 0.926 0.926 0.926 0.926 0.926 6.48 0.24 0.02 0.926 0.926 0.926 0 0 0 0 2.78 0.10186 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.37 24.01.01.05 S5 SPT RELLENO PARA MALLAS Y POZOS DE PUESTA A TIERRA CON TOP SOI m3 95.89% 0.15 1.64 17/12/2021 26/12/2021 10.00 10.00 0.16 1.64 X 0.164 0.164 0.164 0.164 0.164 0.164 0.164 1.15 3.10 0.03 0.164 0.164 0.164 0 0 0 0 0.49 1.3284 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.38 24.01.01.06 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 96.91% 0.15 2.20 17/12/2021 26/12/2021 10.00 10.00 0.22 2.20 X 0.22 0.22 0.22 0.22 0.22 0.22 0.22 1.54 0.18 0.02 0.22 0.22 0.22 0 0 0 0 0.66 0.075768 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.39 24.01.01.07 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 96.92% 0.15 4.38 17/12/2021 26/12/2021 10.00 10.00 0.44 4.38 X 0.438 0.438 0.438 0.438 0.438 0.438 0.438 3.07 0.14 0.02 0.438 0.438 0.438 0 0 0 0 1.31 0.0613638 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.40 24.01.01.08 S5 SPT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 96.91% 0.15 2.20 17/12/2021 26/12/2021 10.00 10.00 0.22 2.20 X 0.22 0.22 0.22 0.22 0.22 0.22 0.22 1.54 0.36 0.02 0.22 0.22 0.22 0 0 0 0 0.66 0.155 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.41 24.02 S5 SPT DISCIPLINA: INSTALACIONES ELÉCTRICAS 0.15 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.42 24.02.01 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 120 M m 67.04% 0.15 154.15 24/12/2021 06/01/2022 14.00 14.00 11.01 154.15 X 0 0 0 0 0 0 0 0 0.00 0 11.011 11.011 11.011 11.011 11.011 11.011 11.011 77.1 62.43075 0.16 11.011 11.011 11.011 11.011 11.011 11.011 11.011 77.1 62.43075 0.16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.43 24.02.02 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE THHN/THWN CO m 66.39% 0.15 17.79 24/12/2021 06/01/2022 14.00 14.00 1.27 17.79 X 0 0 0 0 0 0 0 0 0.00 0 1.2707 1.2707 1.2707 1.2707 1.2707 1.2707 1.2707 8.9 5.76396 0.17 1.2707 1.2707 1.2707 1.2707 1.2707 1.2707 1.2707 8.9 5.76396 0.17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.44 24.02.03 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 16 m 65.99% 0.15 1.48 24/12/2021 06/01/2022 14.00 14.00 0.11 1.48 X 0 0 0 0 0 0 0 0 0.00 0 0.1057 0.1057 0.1057 0.1057 0.1057 0.1057 0.1057 0.74 0.383616 0.19 0.1057 0.1057 0.1057 0.1057 0.1057 0.1057 0.1057 0.74 0.383616 0.19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.45 24.02.04 S5 SPT SUMINISTRO E INSTALACIÓN DE CINTA SEÑALIZADORA PARA CONDUCTO m 3.10% 0.15 453.20 24/12/2021 06/01/2022 14.00 14.00 32.37 453.20 X 0 0 0 0 0 0 0 0 0.00 0 32.371 32.371 32.371 32.371 32.371 32.371 32.371 227 20.394 0.49 32.371 32.371 32.371 32.371 32.371 32.371 32.371 227 20.394 0.49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.46 24.02.05 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.15 17.25 13/01/2022 19/01/2022 7.00 7.00 2.46 17.25 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.4643 2.4643 1.05126429 0.15 2.4643 2.4643 2.4643 2.4643 2.4643 2.4643 0 14.8 6.307586 0.9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.47 24.02.06 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 0.45 13/01/2022 19/01/2022 7.00 7.00 0.06 0.45 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0643 0.0643 5.91428571 0.14 0.0643 0.0643 0.0643 0.0643 0.0643 0.0643 0 0.39 35.48571 0.87 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.48 24.02.07 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 3.30 13/01/2022 19/01/2022 7.00 7.00 0.47 3.30 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4714 0.4714 34.6971429 0.14 0.4714 0.4714 0.4714 0.4714 0.4714 0.4714 0 2.83 208.1829 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.49 24.02.08 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 1.50 13/01/2022 19/01/2022 7.00 7.00 0.21 1.50 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2143 0.2143 0.30857143 0.15 0.2143 0.2143 0.2143 0.2143 0.2143 0.2143 0 1.29 1.851429 0.93 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.50 24.02.09 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 0.90 13/01/2022 19/01/2022 7.00 7.00 0.13 0.90 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1286 0.1286 0.13165714 0.13 0.1286 0.1286 0.1286 0.1286 0.1286 0.1286 0 0.77 0.789943 0.79 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.51 24.02.10 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.15 0.30 13/01/2022 19/01/2022 7.00 7.00 0.04 0.30 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0429 0.0429 0.27428571 0.14 0.0429 0.0429 0.0429 0.0429 0.0429 0.0429 0 0.26 1.645714 0.82 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.52 24.02.11 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 4.65 13/01/2022 19/01/2022 7.00 7.00 0.66 4.65 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.6643 0.6643 0.98314286 0.14 0.6643 0.6643 0.6643 0.6643 0.6643 0.6643 0 3.99 5.898857 0.84 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.53 24.02.12 S5 SPT SUMINISTRO E INSTALACIÓN DE CONEXIÓN CON SOLDADURA EXOTÉRMI GLB 0.00% 0.15 0.15 13/01/2022 19/01/2022 7.00 7.00 0.02 0.15 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0.0214 0.0214 0.02742857 ### 0.0214 0.0214 0.0214 0.0214 0.0214 0.0214 0 0.13 0.164571 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.54 24.02.13 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 0.90 13/01/2022 19/01/2022 7.00 7.00 0.13 0.90 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1286 0.1286 0.25371 0.13 0.1286 0.1286 0.1286 0.1286 0.1286 0.1286 0 0.77 1.52226 0.76 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.55 24.02.14 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 2.10 13/01/2022 19/01/2022 7.00 7.00 0.30 2.10 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3 0.3 0.74001 0.15 0.3 0.3 0.3 0.3 0.3 0.3 0 1.8 4.44006 0.89 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.56 24.02.15 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 14.25 13/01/2022 19/01/2022 7.00 7.00 2.04 14.25 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.0357 2.0357 3.76607143 0.14 2.0357 2.0357 2.0357 2.0357 2.0357 2.0357 0 12.2 22.59643 0.87 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.57 24.02.16 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.15 0.60 13/01/2022 19/01/2022 7.00 7.00 0.09 0.60 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0857 0.0857 0.14094 0.14 0.0857 0.0857 0.0857 0.0857 0.0857 0.0857 0 0.51 0.84564 0.85 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.58 24.02.17 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.15 1.50 13/01/2022 19/01/2022 7.00 7.00 0.21 1.50 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2143 0.2143 0.31714286 0.16 0.2143 0.2143 0.2143 0.2143 0.2143 0.2143 0 1.29 1.902857 0.95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.59 24 S5 SPT SISTEMA DE PUESTA A TIERRA - SECTOR 4: F, G, H, I, K1 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.60 24.01 S5 SPT DISCIPLINA: CIVIL 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.61 24.01.01 S5 SPT MOVIMIENTO DE TIERRAS PARA SISTEMA DE PUESTA A TIERRA Y PROTECCION ATMOSFERICA 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.62 24.01.01.01 S5 SPT EXCAVACIÓN PARA MALLAS Y POZOS DE PUESTA A TIERRA m3 79.43% 0.1 15.74 17/12/2021 13/01/2022 28.00 28.00 0.56 15.74 X 0.5621 0.5621 0.5621 0.5621 0.5621 0.5621 0.5621 3.94 24.40 0.05 0.5621 0.5621 0.5621 0.5621 0.5621 0.5621 0.5621 3.94 24.397 0.05 0.5621 0.5621 0.5621 0.5621 0.5621 0.5621 0.5621 3.94 24.397 0.05 0.5621 0.5621 0.5621 0.5621 0.5621 0.5621 0.5621 3.935 24.397 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.63 24.01.01.02 S5 SPT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 79.43% 0.1 7.94 17/12/2021 13/01/2022 28.00 28.00 0.28 7.94 X 0.2836 0.2836 0.2836 0.2836 0.2836 0.2836 0.2836 1.99 4.02 0.05 0.2836 0.2836 0.2836 0.2836 0.2836 0.2836 0.2836 1.99 4.019625 0.05 0.2836 0.2836 0.2836 0.2836 0.2836 0.2836 0.2836 1.99 4.019625 0.05 0.2836 0.2836 0.2836 0.2836 0.2836 0.2836 0.2836 1.985 4.019625 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.64 24.01.01.03 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 79.43% 0.1 7.12 17/12/2021 13/01/2022 28.00 28.00 0.25 7.12 X 0.2543 0.2543 0.2543 0.2543 0.2543 0.2543 0.2543 1.78 0.28 0.06 0.2543 0.2543 0.2543 0.2543 0.2543 0.2543 0.2543 1.78 0.2759 0.06 0.2543 0.2543 0.2543 0.2543 0.2543 0.2543 0.2543 1.78 0.2759 0.06 0.2543 0.2543 0.2543 0.2543 0.2543 0.2543 0.2543 1.78 0.2759 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.65 24.01.01.04 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 79.43% 0.1 41.18 17/12/2021 13/01/2022 28.00 28.00 1.47 41.18 X 1.4707 1.4707 1.4707 1.4707 1.4707 1.4707 1.4707 10.3 0.38 0.05 1.4707 1.4707 1.4707 1.4707 1.4707 1.4707 1.4707 10.3 0.3774833 0.05 1.4707 1.4707 1.4707 1.4707 1.4707 1.4707 1.4707 10.3 0.3774833 0.05 1.4707 1.4707 1.4707 1.4707 1.4707 1.4707 1.4707 10.295 0.37748333 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.66 24.01.01.05 S5 SPT RELLENO PARA MALLAS Y POZOS DE PUESTA A TIERRA CON TOP SOI m3 79.44% 0.1 5.47 17/12/2021 13/01/2022 28.00 28.00 0.20 5.47 X 0.1954 0.1954 0.1954 0.1954 0.1954 0.1954 0.1954 1.37 3.69 0.05 0.1954 0.1954 0.1954 0.1954 0.1954 0.1954 0.1954 1.37 3.69225 0.05 0.1954 0.1954 0.1954 0.1954 0.1954 0.1954 0.1954 1.37 3.69225 0.05 0.1954 0.1954 0.1954 0.1954 0.1954 0.1954 0.1954 1.3675 3.69225 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.67 24.01.01.06 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 79.43% 0.1 9.75 17/12/2021 13/01/2022 28.00 28.00 0.35 9.75 X 0.3482 0.3482 0.3482 0.3482 0.3482 0.3482 0.3482 2.44 0.28 0.06 0.3482 0.3482 0.3482 0.3482 0.3482 0.3482 0.3482 2.44 0.279825 0.06 0.3482 0.3482 0.3482 0.3482 0.3482 0.3482 0.3482 2.44 0.279825 0.06 0.3482 0.3482 0.3482 0.3482 0.3482 0.3482 0.3482 2.4375 0.279825 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.68 24.01.01.07 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 79.43% 0.1 19.48 17/12/2021 13/01/2022 28.00 28.00 0.70 19.48 X 0.6957 0.6957 0.6957 0.6957 0.6957 0.6957 0.6957 4.87 0.23 0.06 0.6957 0.6957 0.6957 0.6957 0.6957 0.6957 0.6957 4.87 0.227429 0.06 0.6957 0.6957 0.6957 0.6957 0.6957 0.6957 0.6957 4.87 0.227429 0.06 0.6957 0.6957 0.6957 0.6957 0.6957 0.6957 0.6957 4.87 0.227429 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.69 24.01.01.08 S5 SPT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 79.43% 0.1 9.75 17/12/2021 13/01/2022 28.00 28.00 0.35 9.75 X 0.3482 0.3482 0.3482 0.3482 0.3482 0.3482 0.3482 2.44 0.57 0.05 0.3482 0.3482 0.3482 0.3482 0.3482 0.3482 0.3482 2.44 0.5724432 0.05 0.3482 0.3482 0.3482 0.3482 0.3482 0.3482 0.3482 2.44 0.5724432 0.05 0.3482 0.3482 0.3482 0.3482 0.3482 0.3482 0.3482 2.4375 0.57244318 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.70 24.02 S5 SPT DISCIPLINA: INSTALACIONES ELÉCTRICAS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.71 24.02.01 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 120 M m 67.04% 0.1 102.77 24/12/2021 06/01/2022 14.00 14.00 7.34 102.77 X 0 0 0 0 0 0 0 0 0.00 0 7.3407 7.3407 7.3407 7.3407 7.3407 7.3407 7.3407 51.4 41.62185 0.16 7.3407 7.3407 7.3407 7.3407 7.3407 7.3407 7.3407 51.4 41.62185 0.16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.72 24.02.02 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE THHN/THWN CO m 66.39% 0.1 11.86 24/12/2021 06/01/2022 14.00 14.00 0.85 11.86 X 0 0 0 0 0 0 0 0 0.00 0 0.8471 0.8471 0.8471 0.8471 0.8471 0.8471 0.8471 5.93 3.84264 0.17 0.8471 0.8471 0.8471 0.8471 0.8471 0.8471 0.8471 5.93 3.84264 0.17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.73 24.02.03 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 16 m 65.99% 0.1 0.99 24/12/2021 06/01/2022 14.00 14.00 0.07 0.99 X 0 0 0 0 0 0 0 0 0.00 0 0.0707 0.0707 0.0707 0.0707 0.0707 0.0707 0.0707 0.5 0.256608 0.13 0.0707 0.0707 0.0707 0.0707 0.0707 0.0707 0.0707 0.5 0.256608 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.74 24.02.04 S5 SPT SUMINISTRO E INSTALACIÓN DE CINTA SEÑALIZADORA PARA CONDUCTO m 3.10% 0.1 302.13 24/12/2021 06/01/2022 14.00 14.00 21.58 302.13 X 0 0 0 0 0 0 0 0 0.00 0 21.581 21.581 21.581 21.581 21.581 21.581 21.581 151 13.59585 0.49 21.581 21.581 21.581 21.581 21.581 21.581 21.581 151 13.59585 0.49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.75 24.02.05 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.1 11.50 13/01/2022 19/01/2022 7.00 7.00 1.64 11.50 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.6429 1.6429 0.70084286 0.14 1.6429 1.6429 1.6429 1.6429 1.6429 1.6429 0 9.86 4.205057 0.84 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.76 24.02.06 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.1 0.30 13/01/2022 19/01/2022 7.00 7.00 0.04 0.30 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0429 0.0429 3.94285714 0.14 0.0429 0.0429 0.0429 0.0429 0.0429 0.0429 0 0.26 23.65714 0.84 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.77 24.02.07 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.1 2.20 13/01/2022 19/01/2022 7.00 7.00 0.31 2.20 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3143 0.3143 23.1314286 0.14 0.3143 0.3143 0.3143 0.3143 0.3143 0.3143 0 1.89 138.7886 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.78 24.02.08 S5 SPT SUMINISTRO E INSTALACIÓN DE AC
2456.93 24.01.01.03 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 79.43% 0.08 5.69 31/12/2021 13/01/2022 14.00 14.00 0.41 5.69 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.4064 0.4064 0.4064 0.4064 0.4064 0.4064 0.4064 2.85 0.440975 0.11 0.4064 0.4064 0.4064 0.4064 0.4064 0.4064 0.4064 2.845 0.440975 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.94 24.01.01.04 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 79.43% 0.08 32.94 31/12/2021 13/01/2022 14.00 14.00 2.35 32.94 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 2.3529 2.3529 2.3529 2.3529 2.3529 2.3529 2.3529 16.5 0.6039 0.1 2.3529 2.3529 2.3529 2.3529 2.3529 2.3529 2.3529 16.47 0.6039 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.95 24.01.01.05 S5 SPT RELLENO PARA MALLAS Y POZOS DE PUESTA A TIERRA CON TOP SOI m3 79.44% 0.08 4.38 31/12/2021 13/01/2022 14.00 14.00 0.31 4.38 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.3129 0.3129 0.3129 0.3129 0.3129 0.3129 0.3129 2.19 5.913 0.1 0.3129 0.3129 0.3129 0.3129 0.3129 0.3129 0.3129 2.19 5.913 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.96 24.01.01.06 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 79.43% 0.08 7.80 31/12/2021 13/01/2022 14.00 14.00 0.56 7.80 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.5571 0.5571 0.5571 0.5571 0.5571 0.5571 0.5571 3.9 0.44772 0.11 0.5571 0.5571 0.5571 0.5571 0.5571 0.5571 0.5571 3.9 0.44772 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.97 24.01.01.07 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 79.43% 0.08 15.58 31/12/2021 13/01/2022 14.00 14.00 1.11 15.58 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 1.1129 1.1129 1.1129 1.1129 1.1129 1.1129 1.1129 7.79 0.363793 0.09 1.1129 1.1129 1.1129 1.1129 1.1129 1.1129 1.1129 7.79 0.363793 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.98 24.01.01.08 S5 SPT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 79.43% 0.08 7.80 31/12/2021 13/01/2022 14.00 14.00 0.56 7.80 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.5571 0.5571 0.5571 0.5571 0.5571 0.5571 0.5571 3.9 0.9159091 0.1 0.5571 0.5571 0.5571 0.5571 0.5571 0.5571 0.5571 3.9 0.91590909 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.99 24.02 S5 SPT DISCIPLINA: INSTALACIONES ELÉCTRICAS 0.08 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.100 24.02.01 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 120 M m 67.04% 0.08 82.21 07/01/2022 20/01/2022 14.00 14.00 5.87 82.21 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.8721 5.8721 5.8721 5.8721 5.8721 5.8721 5.8721 41.105 33.29505 0.16 5.8721 5.8721 5.8721 5.8721 5.8721 5.8721 5.8721 41.1 33.29505 0.16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.101 24.02.02 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE THHN/THWN CO m 66.39% 0.08 9.49 07/01/2022 20/01/2022 14.00 14.00 0.68 9.49 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.6779 0.6779 0.6779 0.6779 0.6779 0.6779 0.6779 4.745 3.07476 0.17 0.6779 0.6779 0.6779 0.6779 0.6779 0.6779 0.6779 4.75 3.07476 0.17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.102 24.02.03 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 16 m 65.99% 0.08 0.79 07/01/2022 20/01/2022 14.00 14.00 0.06 0.79 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0564 0.0564 0.0564 0.0564 0.0564 0.0564 0.0564 0.395 0.204768 0.2 0.0564 0.0564 0.0564 0.0564 0.0564 0.0564 0.0564 0.4 0.204768 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.103 24.02.04 S5 SPT SUMINISTRO E INSTALACIÓN DE CINTA SEÑALIZADORA PARA CONDUCTO m 3.10% 0.08 241.71 07/01/2022 20/01/2022 14.00 14.00 17.27 241.71 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17.265 17.265 17.265 17.265 17.265 17.265 17.265 120.86 10.87695 0.49 17.265 17.265 17.265 17.265 17.265 17.265 17.265 121 10.87695 0.49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.104 24.02.05 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.08 9.20 27/01/2022 02/02/2022 7.00 7.00 1.31 9.20 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.3143 1.31 0.560674 0.14 1.3143 1.3143 1.3143 1.3143 1.3143 1.3143 0 7.89 3.3640457 0.84 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.105 24.02.06 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.08 0.24 27/01/2022 02/02/2022 7.00 7.00 0.03 0.24 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0343 0.03 3.154286 0.14 0.0343 0.0343 0.0343 0.0343 0.0343 0.0343 0 0.21 18.925714 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.106 24.02.07 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.08 1.76 27/01/2022 02/02/2022 7.00 7.00 0.25 1.76 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2514 0.25 18.50514 0.14 0.2514 0.2514 0.2514 0.2514 0.2514 0.2514 0 1.51 111.03086 0.85 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.107 24.02.08 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.08 0.80 27/01/2022 02/02/2022 7.00 7.00 0.11 0.80 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1143 0.11 0.164571 0.16 0.1143 0.1143 0.1143 0.1143 0.1143 0.1143 0 0.69 0.9874286 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.108 24.02.09 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.08 0.48 27/01/2022 02/02/2022 7.00 7.00 0.07 0.48 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0.0686 0.07 0.070217 ### 0.0686 0.0686 0.0686 0.0686 0.0686 0.0686 0 0.41 0.4213029 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.109 24.02.10 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.08 0.16 27/01/2022 02/02/2022 7.00 7.00 0.02 0.16 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0229 0.02 0.146286 0.15 0.0229 0.0229 0.0229 0.0229 0.0229 0.0229 0 0.14 0.8777143 0.88 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.110 24.02.11 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.08 2.48 27/01/2022 02/02/2022 7.00 7.00 0.35 2.48 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3543 0.35 0.524343 0.13 0.3543 0.3543 0.3543 0.3543 0.3543 0.3543 0 2.13 3.1460571 0.79 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.111 24.02.12 S5 SPT SUMINISTRO E INSTALACIÓN DE CONEXIÓN CON SOLDADURA EXOTÉRMI GLB 0.00% 0.08 0.08 27/01/2022 02/02/2022 7.00 7.00 0.01 0.08 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0.0114 0.01 0.014629 ### 0.0114 0.0114 0.0114 0.0114 0.0114 0.0114 0 0.07 0.0877714 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.112 24.02.13 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.08 0.48 27/01/2022 02/02/2022 7.00 7.00 0.07 0.48 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0686 0.07 0.135312 0.14 0.0686 0.0686 0.0686 0.0686 0.0686 0.0686 0 0.41 0.811872 0.81 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.113 24.02.14 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.08 1.12 27/01/2022 02/02/2022 7.00 7.00 0.16 1.12 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.16 0.16 0.394672 0.13 0.16 0.16 0.16 0.16 0.16 0.16 0 0.96 2.368032 0.79 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.114 24.02.15 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.08 7.60 27/01/2022 02/02/2022 7.00 7.00 1.09 7.60 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.0857 1.09 2.008571 0.14 1.0857 1.0857 1.0857 1.0857 1.0857 1.0857 0 6.51 12.051429 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.115 24.02.16 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.08 0.32 27/01/2022 02/02/2022 7.00 7.00 0.05 0.32 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0457 0.05 0.075168 0.08 0.0457 0.0457 0.0457 0.0457 0.0457 0.0457 0 0.27 0.451008 0.45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.116 24.02.17 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.08 0.80 27/01/2022 02/02/2022 7.00 7.00 0.11 0.80 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1143 0.11 0.169143 0.17 0.1143 0.1143 0.1143 0.1143 0.1143 0.1143 0 0.69 1.0148571 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.117 24 S5 SPT SISTEMA DE PUESTA A TIERRA - SECTOR 3.2: OyP, M, N 0.13 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.118 24.01 S5 SPT DISCIPLINA: CIVIL 0.13 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.119 24.01.01 S5 SPT MOVIMIENTO DE TIERRAS PARA SISTEMA DE PUESTA A TIERRA Y PROTECCION ATMOSFERICA 0.13 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.120 24.01.01.01 S5 SPT EXCAVACIÓN PARA MALLAS Y POZOS DE PUESTA A TIERRA m3 79.43% 0.13 20.46 07/01/2022 20/01/2022 14.00 14.00 1.46 20.46 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.4614 1.4614 1.4614 1.4614 1.4614 1.4614 1.4614 10.23 63.426 0.1 1.4614 1.4614 1.4614 1.4614 1.4614 1.4614 1.4614 10.2 63.426 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.121 24.01.01.02 S5 SPT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 79.43% 0.13 10.32 07/01/2022 20/01/2022 14.00 14.00 0.74 10.32 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7371 0.7371 0.7371 0.7371 0.7371 0.7371 0.7371 5.16 10.449 0.1 0.7371 0.7371 0.7371 0.7371 0.7371 0.7371 0.7371 5.16 10.449 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.122 24.01.01.03 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 79.43% 0.13 9.25 07/01/2022 20/01/2022 14.00 14.00 0.66 9.25 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.6607 0.6607 0.6607 0.6607 0.6607 0.6607 0.6607 4.625 0.716875 0.1 0.6607 0.6607 0.6607 0.6607 0.6607 0.6607 0.6607 4.63 0.716875 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.123 24.01.01.04 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 79.43% 0.13 53.53 07/01/2022 20/01/2022 14.00 14.00 3.82 53.53 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.8236 3.8236 3.8236 3.8236 3.8236 3.8236 3.8236 26.765 0.98138333 0.1 3.8236 3.8236 3.8236 3.8236 3.8236 3.8236 3.8236 26.8 0.981383 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.124 24.01.01.05 S5 SPT RELLENO PARA MALLAS Y POZOS DE PUESTA A TIERRA CON TOP SOI m3 79.44% 0.13 7.11 07/01/2022 20/01/2022 14.00 14.00 0.51 7.11 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5079 0.5079 0.5079 0.5079 0.5079 0.5079 0.5079 3.555 9.5985 0.1 0.5079 0.5079 0.5079 0.5079 0.5079 0.5079 0.5079 3.56 9.5985 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.125 24.01.01.06 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 79.43% 0.13 12.68 07/01/2022 20/01/2022 14.00 14.00 0.91 12.68 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.9057 0.9057 0.9057 0.9057 0.9057 0.9057 0.9057 6.34 0.727832 0.1 0.9057 0.9057 0.9057 0.9057 0.9057 0.9057 0.9057 6.34 0.727832 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.126 24.01.01.07 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 79.43% 0.13 25.32 07/01/2022 20/01/2022 14.00 14.00 1.81 25.32 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.8086 1.8086 1.8086 1.8086 1.8086 1.8086 1.8086 12.66 0.591222 0.1 1.8086 1.8086 1.8086 1.8086 1.8086 1.8086 1.8086 12.7 0.591222 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.127 24.01.01.08 S5 SPT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 79.43% 0.13 12.68 07/01/2022 20/01/2022 14.00 14.00 0.91 12.68 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.9057 0.9057 0.9057 0.9057 0.9057 0.9057 0.9057 6.34 1.48893939 0.11 0.9057 0.9057 0.9057 0.9057 0.9057 0.9057 0.9057 6.34 1.488939 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.128 24.02 S5 SPT DISCIPLINA: INSTALACIONES ELÉCTRICAS 0.13 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.129 24.02.01 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 120 M m 67.04% 0.13 133.60 14/01/2022 27/01/2022 14.00 14.00 9.54 133.60 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9.5429 9.5429 9.5429 9.5429 9.5429 9.5429 9.5429 66.8 54.108 0.16 9.5429 9.5429 9.5429 9.5429 9.5429 9.5429 9.5429 66.8 54.108 0.16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.130 24.02.02 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE THHN/THWN CO m 66.39% 0.13 15.42 14/01/2022 27/01/2022 14.00 14.00 1.10 15.42 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.1014 1.1014 1.1014 1.1014 1.1014 1.1014 1.1014 7.71 4.99608 0.17 1.1014 1.1014 1.1014 1.1014 1.1014 1.1014 1.1014 7.71 4.99608 0.17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.131 24.02.03 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 16 m 65.99% 0.13 1.28 14/01/2022 27/01/2022 14.00 14.00 0.09 1.28 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0914 0.0914 0.0914 0.0914 0.0914 0.0914 0.0914 0.64 0.331776 0.17 0.0914 0.0914 0.0914 0.0914 0.0914 0.0914 0.0914 0.64 0.331776 0.17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.132 24.02.04 S5 SPT SUMINISTRO E INSTALACIÓN DE CINTA SEÑALIZADORA PARA CONDUCTO m 3.10% 0.13 392.77 14/01/2022 27/01/2022 14.00 14.00 28.06 392.77 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 28.055 28.055 28.055 28.055 28.055 28.055 28.055 196 17.67465 0.49 28.055 28.055 28.055 28.055 28.055 28.055 28.055 196 17.67465 0.49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.133 24.02.05 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.13 14.95 03/02/2022 09/02/2022 7.00 7.00 2.14 14.95 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.1357 2.14 0.9110957 0.15 2.1357 2.1357 2.1357 2.1357 2.1357 2.1357 0 12.85.466574 0.91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.134 24.02.06 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.13 0.39 03/02/2022 09/02/2022 7.00 7.00 0.06 0.39 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0557 0.06 5.1257143 0.14 0.0557 0.0557 0.0557 0.0557 0.0557 0.0557 0 0.3330.75429 0.85 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.135 24.02.07 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.13 2.86 03/02/2022 09/02/2022 7.00 7.00 0.41 2.86 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4086 0.41 30.070857 0.14 0.4086 0.4086 0.4086 0.4086 0.4086 0.4086 0 2.45180.4251 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.136 24.02.08 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.13 1.30 03/02/2022 09/02/2022 7.00 7.00 0.19 1.30 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1857 0.19 0.2674286 0.13 0.1857 0.1857 0.1857 0.1857 0.1857 0.1857 0 1.111.604571 0.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.137 24.02.09 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.13 0.78 03/02/2022 09/02/2022 7.00 7.00 0.11 0.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1114 0.11 0.1141029 0.11 0.1114 0.1114 0.1114 0.1114 0.1114 0.1114 0 0.670.684617 0.68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.138 24.02.10 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.13 0.26 03/02/2022 09/02/2022 7.00 7.00 0.04 0.26 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0371 0.04 0.2377143 0.12 0.0371 0.0371 0.0371 0.0371 0.0371 0.0371 0 0.221.426286 0.71 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.139 24.02.11 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.13 4.03 03/02/2022 09/02/2022 7.00 7.00 0.58 4.03 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5757 0.58 0.8520571 0.14 0.5757 0.5757 0.5757 0.5757 0.5757 0.5757 0 3.455.112343 0.85 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.140 24.02.12 S5 SPT SUMINISTRO E INSTALACIÓN DE CONEXIÓN CON SOLDADURA EXOTÉRMI GLB 0.00% 0.13 0.13 03/02/2022 09/02/2022 7.00 7.00 0.02 0.13 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0.0186 0.02 0.0237714 ### 0.0186 0.0186 0.0186 0.0186 0.0186 0.0186 0 0.110.142629 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.141 24.02.13 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.13 0.78 03/02/2022 09/02/2022 7.00 7.00 0.11 0.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1114 0.11 0.219882 0.11 0.1114 0.1114 0.1114 0.1114 0.1114 0.1114 0 0.671.319292 0.66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.142 24.02.14 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.13 1.82 03/02/2022 09/02/2022 7.00 7.00 0.26 1.82 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.26 0.26 0.641342 0.16 0.26 0.26 0.26 0.26 0.26 0.26 0 1.563.848052 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.143 24.02.15 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.13 12.35 03/02/2022 09/02/2022 7.00 7.00 1.76 12.35 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.7643 1.76 3.2639286 0.14 1.7643 1.7643 1.7643 1.7643 1.7643 1.7643 0 10.619.58357 0.85 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.144 24.02.16 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.13 0.52 03/02/2022 09/02/2022 7.00 7.00 0.07 0.52 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0743 0.07 0.122148 0.12 0.0743 0.0743 0.0743 0.0743 0.0743 0.0743 0 0.450.732888 0.73 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.145 24.02.17 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.13 1.30 03/02/2022 09/02/2022 7.00 7.00 0.19 1.30 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1857 0.19 0.2748571 0.14 0.1857 0.1857 0.1857 0.1857 0.1857 0.1857 0 1.111.649143 0.82 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.146 24 S5 SPT SISTEMA DE PUESTA A TIERRA - SECTOR 3.3: L, K2 0.09 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.147 24.01 S5 SPT DISCIPLINA: CIVIL 0.09 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.148 24.01.01 S5 SPT MOVIMIENTO DE TIERRAS PARA SISTEMA DE PUESTA A TIERRA Y PROTECCION ATMOSFERICA 0.09 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.149 24.01.01.01 S5 SPT EXCAVACIÓN PARA MALLAS Y POZOS DE PUESTA A TIERRA m3 79.43% 0.09 14.16 04/01/2022 17/01/2022 14.00 14.00 1.01 14.16 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.0114 1.0114 1.0114 3.03 18.812571 0.04 1.0114 1.0114 1.0114 1.0114 1.0114 1.0114 1.0114 7.08 43.896 0.1 1.0114 1.0114 1.0114 1.0114 0 0 0 4.05 25.08343 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.150 24.01.01.02 S5 SPT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 79.43% 0.09 7.15 04/01/2022 17/01/2022 14.00 14.00 0.51 7.15 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5107 0.5107 0.5107 1.53 3.1025893 0.04 0.5107 0.5107 0.5107 0.5107 0.5107 0.5107 0.5107 3.575 7.239375 0.1 0.5107 0.5107 0.5107 0.5107 0 0 0 2.04 4.136786 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.151 24.01.01.03 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 79.43% 0.09 6.40 04/01/2022 17/01/2022 14.00 14.00 0.46 6.40 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4571 0.4571 0.4571 1.37 0.2125714 0.04 0.4571 0.4571 0.4571 0.4571 0.4571 0.4571 0.4571 3.2 0.496 0.1 0.4571 0.4571 0.4571 0.4571 0 0 0 1.83 0.283429 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.152 24.01.01.04 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 79.43% 0.09 37.06 04/01/2022 17/01/2022 14.00 14.00 2.65 37.06 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.6471 2.6471 2.6471 7.94 0.2911857 0.04 2.6471 2.6471 2.6471 2.6471 2.6471 2.6471 2.6471 18.53 0.67943333 0.1 2.6471 2.6471 2.6471 2.6471 0 0 0 10.6 0.388248 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.153 24.01.01.05 S5 SPT RELLENO PARA MALLAS Y POZOS DE PUESTA A TIERRA CON TOP SOI m3 79.44% 0.09 4.92 04/01/2022 17/01/2022 14.00 14.00 0.35 4.92 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3514 0.3514 0.3514 1.05 2.8465714 0.04 0.3514 0.3514 0.3514 0.3514 0.3514 0.3514 0.3514 2.46 6.642 0.1 0.3514 0.3514 0.3514 0.3514 0 0 0 1.41 3.795429 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.154 24.01.01.06 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 79.43% 0.09 8.78 04/01/2022 17/01/2022 14.00 14.00 0.63 8.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.6271 0.6271 0.6271 1.88 0.215988 0.04 0.6271 0.6271 0.6271 0.6271 0.6271 0.6271 0.6271 4.39 0.503972 0.1 0.6271 0.6271 0.6271 0.6271 0 0 0 2.51 0.287984 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.155 24.01.01.07 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 79.43% 0.09 17.53 04/01/2022 17/01/2022 14.00 14.00 1.25 17.53 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.2521 1.2521 1.2521 3.76 0.1754252 0.04 1.2521 1.2521 1.2521 1.2521 1.2521 1.2521 1.2521 8.765 0.4093255 0.1 1.2521 1.2521 1.2521 1.2521 0 0 0 5.01 0.2339 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.156 24.01.01.08 S5 SPT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 79.43% 0.09 8.78 04/01/2022 17/01/2022 14.00 14.00 0.63 8.78 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.6271 0.6271 0.6271 1.88 0.4418506 0.04 0.6271 0.6271 0.6271 0.6271 0.6271 0.6271 0.6271 4.39 1.03098485 0.1 0.6271 0.6271 0.6271 0.6271 0 0 0 2.51 0.589134 0.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.157 24.02 S5 SPT DISCIPLINA: INSTALACIONES ELÉCTRICAS 0.09 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.158 24.02.01 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 120 M m 67.04% 0.09 92.49 11/01/2022 24/01/2022 14.00 14.00 6.61 92.49 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.6064 6.6064 6.6064 19.819 16.0536214 0.07 6.6064 6.6064 6.6064 6.6064 6.6064 6.6064 6.6064 46.2 37.45845 0.17 6.6064 6.6064 6.6064 6.6064 0 0 0 26.4 21.40483 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.159 24.02.02 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE THHN/THWN CO m 66.39% 0.09 10.68 11/01/2022 24/01/2022 14.00 14.00 0.76 10.68 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7629 0.7629 0.7629 2.2886 1.48299429 0.07 0.7629 0.7629 0.7629 0.7629 0.7629 0.7629 0.7629 5.34 3.46032 0.16 0.7629 0.7629 0.7629 0.7629 0 0 0 3.05 1.977326 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.160 24.02.03 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 16 m 65.99% 0.09 0.89 11/01/2022 24/01/2022 14.00 14.00 0.06 0.89 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0636 0.0636 0.0636 0.1907 0.09886629 0.1 0.0636 0.0636 0.0636 0.0636 0.0636 0.0636 0.0636 0.45 0.230688 0.23 0.0636 0.0636 0.0636 0.0636 0 0 0 0.25 0.131822 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.161 24.02.04 S5 SPT SUMINISTRO E INSTALACIÓN DE CINTA SEÑALIZADORA PARA CONDUCTO m 3.10% 0.09 271.92 11/01/2022 24/01/2022 14.00 14.00 19.42 271.92 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19.423 19.423 19.423 58.269 5.24417143 0.21 19.423 19.423 19.423 19.423 19.423 19.423 19.423 136 12.2364 0.49 19.423 19.423 19.423 19.423 0 0 0 77.7 6.992229 0.28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.162 24.02.05 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.09 10.35 31/01/2022 06/02/2022 7.00 7.00 1.48 10.35 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.4786 1.4786 1.4786 1.4786 5.91 2.5230343 0.63 1.4786 1.4786 1.4786 0 0 0 0 4.441.892276 0.47 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.163 24.02.06 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.09 0.27 31/01/2022 06/02/2022 7.00 7.00 0.04 0.27 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0386 0.0386 0.0386 0.0386 0.15 14.194286 0.57 0.0386 0.0386 0.0386 0 0 0 0 0.1210.64571 0.43 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.164 24.02.07 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.09 1.98 31/01/2022 06/02/2022 7.00 7.00 0.28 1.98 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2829 0.2829 0.2829 0.2829 1.13 83.273143 0.57 0.2829 0.2829 0.2829 0 0 0 0 0.8562.45486 0.43 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.165 24.02.08 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.09 0.90 31/01/2022 06/02/2022 7.00 7.00 0.13 0.90 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1286 0.1286 0.1286 0.1286 0.51 0.7405714 0.74 0.1286 0.1286 0.1286 0 0 0 0 0.390.555429 0.56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.166 24.02.09 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.09 0.54 31/01/2022 06/02/2022 7.00 7.00 0.08 0.54 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0771 0.0771 0.0771 0.0771 0.31 0.3159771 0.32 0.0771 0.0771 0.0771 0 0 0 0 0.230.236983 0.24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.167 24.02.10 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.09 0.18 31/01/2022 06/02/2022 7.00 7.00 0.03 0.18 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0257 0.0257 0.0257 0.0257 0.1 0.6582857 0.66 0.0257 0.0257 0.0257 0 0 0 0 0.080.493714 0.49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.168 24.02.11 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.09 2.79 31/01/2022 06/02/2022 7.00 7.00 0.40 2.79 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3986 0.3986 0.3986 0.3986 1.59 2.3595429 0.59 0.3986 0.3986 0.3986 0 0 0 0 1.21.769657 0.44 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.169 24.02.12 S5 SPT SUMINISTRO E INSTALACIÓN DE CONEXIÓN CON SOLDADURA EXOTÉRMI GLB 0.00% 0.09 0.09 31/01/2022 06/02/2022 7.00 7.00 0.01 0.09 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0.0129 0.0129 0.0129 0.0129 0.05 0.0658286 ### 0.0129 0.0129 0.0129 0 0 0 0 0.040.049371 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.170 24.02.13 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.09 0.54 31/01/2022 06/02/2022 7.00 7.00 0.08 0.54 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0771 0.0771 0.0771 0.0771 0.31 0.608904 0.61 0.0771 0.0771 0.0771 0 0 0 0 0.230.456678 0.46 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.171 24.02.14 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.09 1.26 31/01/2022 06/02/2022 7.00 7.00 0.18 1.26 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.18 0.18 0.18 0.18 0.72 1.776024 0.59 0.18 0.18 0.18 0 0 0 0 0.541.332018 0.44 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.172 24.02.15 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.09 8.55 31/01/2022 06/02/2022 7.00 7.00 1.22 8.55 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.2214 1.2214 1.2214 1.2214 4.89 9.0385714 0.56 1.2214 1.2214 1.2214 0 0 0 0 3.666.778929 0.42 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.173 24.02.16 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.09 0.36 31/01/2022 06/02/2022 7.00 7.00 0.05 0.36 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0514 0.0514 0.0514 0.0514 0.21 0.338256 0.34 0.0514 0.0514 0.0514 0 0 0 0 0.150.253692 0.25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.174 24.02.17 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.09 0.90 31/01/2022 06/02/2022 7.00 7.00 0.13 0.90 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1286 0.1286 0.1286 0.1286 0.51 0.7611429 0.76 0.1286 0.1286 0.1286 0 0 0 0 0.390.570857 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.175 24 S5 SPT SISTEMA DE PUESTA A TIERRA - CERCO PERIMÉTRICO INTERIOR 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.176 24.01 S5 SPT DISCIPLINA: CIVIL 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.177 24.01.01 S5 SPT MOVIMIENTO DE TIERRAS PARA SISTEMA DE PUESTA A TIERRA Y PROTECCION ATMOSFERICA 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.178 24.01.01.01 S5 SPT EXCAVACIÓN PARA MALLAS Y POZOS DE PUESTA A TIERRA m3 90.86% 0.1 6.99 31/12/2021 20/01/2022 21.00 21.00 0.33 6.99 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.3329 0.3329 0.3329 0.3329 0.3329 0.3329 0.3329 2.33 14.446 0.03 0.3329 0.3329 0.3329 0.3329 0.3329 0.3329 0.3329 2.33 14.446 0.03 0.3329 0.3329 0.3329 0.3329 0.3329 0.3329 0.3329 2.33 14.446 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.179 24.01.01.02 S5 SPT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 90.86% 0.1 3.53 31/12/2021 20/01/2022 21.00 21.00 0.17 3.53 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1681 0.1681 0.1681 0.1681 0.1681 0.1681 0.1681 1.18 2.38275 0.03 0.1681 0.1681 0.1681 0.1681 0.1681 0.1681 0.1681 1.1767 2.38275 0.03 0.1681 0.1681 0.1681 0.1681 0.1681 0.1681 0.1681 1.18 2.38275 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.180 24.01.01.03 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 90.86% 0.1 3.16 31/12/2021 20/01/2022 21.00 21.00 0.15 3.16 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1505 0.1505 0.1505 0.1505 0.1505 0.1505 0.1505 1.05 0.1632667 0.03 0.1505 0.1505 0.1505 0.1505 0.1505 0.1505 0.1505 1.0533 0.16326667 0.03 0.1505 0.1505 0.1505 0.1505 0.1505 0.1505 0.1505 1.05 0.163267 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.181 24.01.01.04 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 90.86% 0.1 18.30 31/12/2021 20/01/2022 21.00 21.00 0.87 18.30 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.8714 0.8714 0.8714 0.8714 0.8714 0.8714 0.8714 6.1 0.2236667 0.03 0.8714 0.8714 0.8714 0.8714 0.8714 0.8714 0.8714 6.1 0.22366667 0.03 0.8714 0.8714 0.8714 0.8714 0.8714 0.8714 0.8714 6.1 0.223667 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.182 24.01.01.05 S5 SPT RELLENO PARA MALLAS Y POZOS DE PUESTA A TIERRA CON TOP SOI m3 90.86% 0.1 2.43 31/12/2021 20/01/2022 21.00 21.00 0.12 2.43 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.1157 0.1157 0.1157 0.1157 0.1157 0.1157 0.1157 0.81 2.187 0.03 0.1157 0.1157 0.1157 0.1157 0.1157 0.1157 0.1157 0.81 2.187 0.03 0.1157 0.1157 0.1157 0.1157 0.1157 0.1157 0.1157 0.81 2.187 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.183 24.01.01.06 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 90.85% 0.1 4.34 31/12/2021 20/01/2022 21.00 21.00 0.21 4.34 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.2067 0.2067 0.2067 0.2067 0.2067 0.2067 0.2067 1.45 0.1660773 0.03 0.2067 0.2067 0.2067 0.2067 0.2067 0.2067 0.2067 1.4467 0.16607733 0.03 0.2067 0.2067 0.2067 0.2067 0.2067 0.2067 0.2067 1.45 0.166077 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.184 24.01.01.07 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 90.86% 0.1 8.66 31/12/2021 20/01/2022 21.00 21.00 0.41 8.66 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.4124 0.4124 0.4124 0.4124 0.4124 0.4124 0.4124 2.89 0.1348073 0.03 0.4124 0.4124 0.4124 0.4124 0.4124 0.4124 0.4124 2.8867 0.13480733 0.03 0.4124 0.4124 0.4124 0.4124 0.4124 0.4124 0.4124 2.89 0.134807 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.185 24.01.01.08 S5 SPT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 90.85% 0.1 4.34 31/12/2021 20/01/2022 21.00 21.00 0.21 4.34 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0.2067 0.2067 0.2067 0.2067 0.2067 0.2067 0.2067 1.45 0.3397475 0.03 0.2067 0.2067 0.2067 0.2067 0.2067 0.2067 0.2067 1.4467 0.33974747 0.03 0.2067 0.2067 0.2067 0.2067 0.2067 0.2067 0.2067 1.45 0.339747 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.186 24.02 S5 SPT DISCIPLINA: INSTALACIONES ELÉCTRICAS 0.1 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.187 24.02.01 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 120 M m 67.04% 0.1 102.77 07/01/2022 27/01/2022 21.00 21.00 4.89 102.77 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.8938 4.8938 4.8938 4.8938 4.8938 4.8938 4.8938 34.257 27.7479 0.11 4.8938 4.8938 4.8938 4.8938 4.8938 4.8938 4.8938 34.3 27.7479 0.11 4.8938 4.8938 4.8938 4.8938 4.8938 4.8938 4.8938 34.3 27.7479 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.188 24.02.02 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE THHN/THWN CO m 66.39% 0.1 11.86 07/01/2022 27/01/2022 21.00 21.00 0.56 11.86 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5648 0.5648 0.5648 0.5648 0.5648 0.5648 0.5648 3.9533 2.56176 0.11 0.5648 0.5648 0.5648 0.5648 0.5648 0.5648 0.5648 3.95 2.56176 0.11 0.5648 0.5648 0.5648 0.5648 0.5648 0.5648 0.5648 3.95 2.56176 0.11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.189 24.02.03 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 16 m 65.99% 0.1 0.99 07/01/2022 27/01/2022 21.00 21.00 0.05 0.99 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0471 0.0471 0.0471 0.0471 0.0471 0.0471 0.0471 0.33 0.171072 0.09 0.0471 0.0471 0.0471 0.0471 0.0471 0.0471 0.0471 0.33 0.171072 0.09 0.0471 0.0471 0.0471 0.0471 0.0471 0.0471 0.0471 0.33 0.171072 0.09 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.190 24.02.04 S5 SPT SUMINISTRO E INSTALACIÓN DE CINTA SEÑALIZADORA PARA CONDUCTO m 12.33% 0.1 273.36 05/01/2022 25/01/2022 21.00 21.00 13.02 273.36 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13.017 13.017 26 2.3430857 0.08 13.017 13.017 13.017 13.017 13.017 13.017 13.017 91.12 8.2008 0.29 13.017 13.017 13.017 13.017 13.017 13.017 13.017 91.1 8.2008 0.29 13.017 13.017 13.017 13.017 13.017 0 0 65.1 5.857714 0.21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.191 24.02.05 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.1 11.50 25/01/2022 31/01/2022 7.00 7.00 1.64 11.50 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.6429 1.6429 1.6429 4.93 2.102529 0.42 1.6429 1.6429 1.6429 1.6429 0 0 0 6.57 2.8033714 0.56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.192 24.02.06 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.1 0.30 25/01/2022 31/01/2022 7.00 7.00 0.04 0.30 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0429 0.0429 0.0429 0.13 11.82857 0.42 0.0429 0.0429 0.0429 0.0429 0 0 0 0.17 15.771429 0.56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.193 24.02.07 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.1 2.20 25/01/2022 31/01/2022 7.00 7.00 0.31 2.20 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3143 0.3143 0.3143 0.94 69.39429 0.43 0.3143 0.3143 0.3143 0.3143 0 0 0 1.26 92.525714 0.57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.194 24.02.08 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.1 1.00 25/01/2022 31/01/2022 7.00 7.00 0.14 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 0.617143 0.62 0.1429 0.1429 0.1429 0.1429 0 0 0 0.57 0.8228571 0.82 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.195 24.02.09 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.1 0.60 25/01/2022 31/01/2022 7.00 7.00 0.09 0.60 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0857 0.0857 0.0857 0.26 0.263314 0.26 0.0857 0.0857 0.0857 0.0857 0 0 0 0.34 0.3510857 0.35 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.196 24.02.10 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.1 0.20 25/01/2022 31/01/2022 7.00 7.00 0.03 0.20 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0286 0.0286 0.0286 0.09 0.548571 0.55 0.0286 0.0286 0.0286 0.0286 0 0 0 0.11 0.7314286 0.73 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.197 24.02.11 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.1 3.10 25/01/2022 31/01/2022 7.00 7.00 0.44 3.10 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4429 0.4429 0.4429 1.33 1.966286 0.39 0.4429 0.4429 0.4429 0.4429 0 0 0 1.77 2.6217143 0.52 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.198 24.02.12 S5 SPT SUMINISTRO E INSTALACIÓN DE CONEXIÓN CON SOLDADURA EXOTÉRMI GLB 0.00% 0.1 0.10 25/01/2022 31/01/2022 7.00 7.00 0.01 0.10 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0.0143 0.0143 0.0143 0.04 0.054857 ### 0.0143 0.0143 0.0143 0.0143 0 0 0 0.06 0.0731429 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.199 24.02.13 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.1 0.60 25/01/2022 31/01/2022 7.00 7.00 0.09 0.60 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0857 0.0857 0.0857 0.26 0.50742 0.51 0.0857 0.0857 0.0857 0.0857 0 0 0 0.34 0.67656 0.68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.200 24.02.14 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.1 1.40 25/01/2022 31/01/2022 7.00 7.00 0.20 1.40 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2 0.2 0.2 0.6 1.48002 0.49 0.2 0.2 0.2 0.2 0 0 0 0.8 1.97336 0.66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.201 24.02.15 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.1 9.50 25/01/2022 31/01/2022 7.00 7.00 1.36 9.50 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.3571 1.3571 1.3571 4.07 7.532143 0.42 1.3571 1.3571 1.3571 1.3571 0 0 0 5.43 10.042857 0.56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.202 24.02.16 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.1 0.40 25/01/2022 31/01/2022 7.00 7.00 0.06 0.40 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0571 0.0571 0.0571 0.17 0.28188 0.28 0.0571 0.0571 0.0571 0.0571 0 0 0 0.23 0.37584 0.38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.203 24.02.17 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.1 1.00 25/01/2022 31/01/2022 7.00 7.00 0.14 1.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1429 0.1429 0.1429 0.43 0.634286 0.63 0.1429 0.1429 0.1429 0.1429 0 0 0 0.57 0.8457143 0.85 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.204 24 S5 SPT SISTEMA DE PUESTA A TIERRA - CERCO PERIMÉTRICO EXTERIOR 0.2 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.205 24.01 S5 SPT DISCIPLINA: CIVIL 0.2 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.206 24.01.01 S5 SPT MOVIMIENTO DE TIERRAS PARA SISTEMA DE PUESTA A TIERRA Y PROTECCION ATMOSFERICA 0.2 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.207 24.01.01.01 S5 SPT EXCAVACIÓN PARA MALLAS Y POZOS DE PUESTA A TIERRA m3 79.43% 0.2 31.47 15/01/2022 28/01/2022 14.00 14.00 2.25 31.47 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.2479 2.2479 2.2479 2.2479 2.2479 2.2479 13.5 83.62029 0.09 2.2479 2.2479 2.2479 2.2479 2.2479 2.2479 2.2479 15.7 97.557 0.1 2.2479 0 0 0 0 0 0 2.25 13.936714 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.208 24.01.01.02 S5 SPT RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 79.43% 0.2 15.88 15/01/2022 28/01/2022 14.00 14.00 1.13 15.88 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.1343 1.1343 1.1343 1.1343 1.1343 1.1343 6.81 13.78157 0.09 1.1343 1.1343 1.1343 1.1343 1.1343 1.1343 1.1343 7.94 16.0785 0.1 1.1343 0 0 0 0 0 0 1.13 2.2969286 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.209 24.01.01.03 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 79.43% 0.2 14.23 15/01/2022 28/01/2022 14.00 14.00 1.02 14.23 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.0164 1.0164 1.0164 1.0164 1.0164 1.0164 6.1 0.945279 0.09 1.0164 1.0164 1.0164 1.0164 1.0164 1.0164 1.0164 7.12 1.102825 0.1 1.0164 0 0 0 0 0 0 1.02 0.1575464 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.210 24.01.01.04 S5 SPT TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 79.43% 0.2 82.36 15/01/2022 28/01/2022 14.00 14.00 5.88 82.36 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.8829 5.8829 5.8829 5.8829 5.8829 5.8829 35.3 1.294229 0.09 5.8829 5.8829 5.8829 5.8829 5.8829 5.8829 5.8829 41.2 1.509933 0.1 5.8829 0 0 0 0 0 0 5.88 0.2157048 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.211 24.01.01.05 S5 SPT RELLENO PARA MALLAS Y POZOS DE PUESTA A TIERRA CON TOP SOI m3 79.44% 0.2 10.94 15/01/2022 28/01/2022 14.00 14.00 0.78 10.94 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.7814 0.7814 0.7814 0.7814 0.7814 0.7814 4.69 12.65914 0.09 0.7814 0.7814 0.7814 0.7814 0.7814 0.7814 0.7814 5.47 14.769 0.1 0.7814 0 0 0 0 0 0 0.78 2.1098571 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.212 24.01.01.06 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 79.43% 0.2 19.51 15/01/2022 28/01/2022 14.00 14.00 1.39 19.51 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.3936 1.3936 1.3936 1.3936 1.3936 1.3936 8.36 0.959892 0.09 1.3936 1.3936 1.3936 1.3936 1.3936 1.3936 1.3936 9.76 1.119874 0.1 1.3936 0 0 0 0 0 0 1.39 0.159982 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.213 24.01.01.07 S5 SPT ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 79.43% 0.2 38.96 15/01/2022 28/01/2022 14.00 14.00 2.78 38.96 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.7829 2.7829 2.7829 2.7829 2.7829 2.7829 16.7 0.779757 0.09 2.7829 2.7829 2.7829 2.7829 2.7829 2.7829 2.7829 19.5 0.909716 0.1 2.7829 0 0 0 0 0 0 2.78 0.1299594 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.214 24.01.01.08 S5 SPT APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 79.43% 0.2 19.51 15/01/2022 28/01/2022 14.00 14.00 1.39 19.51 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.3936 1.3936 1.3936 1.3936 1.3936 1.3936 8.36 1.963669 0.09 1.3936 1.3936 1.3936 1.3936 1.3936 1.3936 1.3936 9.76 2.290947 0.1 1.3936 0 0 0 0 0 0 1.39 0.3272781 0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.215 24.02 S5 SPT DISCIPLINA: INSTALACIONES ELÉCTRICAS 0.2 0 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.216 24.02.01 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 120 M m 67.04% 0.2 205.53 22/01/2022 04/02/2022 14.00 14.00 14.68 205.53 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14.681 14.681 14.681 14.681 14.681 14.681 88.1 71.34827 0.14 14.681 14.681 14.681 14.681 14.681 14.681 14.681 103 83.23965 0.16 14.681 0 0 0 0 0 0 14.711.89138 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.217 24.02.02 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE THHN/THWN CO m 66.39% 0.2 23.73 22/01/2022 04/02/2022 14.00 14.00 1.70 23.73 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.695 1.695 1.695 1.695 1.695 1.695 10.2 6.59016 0.14 1.695 1.695 1.695 1.695 1.695 1.695 1.695 11.9 7.68852 0.17 1.695 0 0 0 0 0 0 1.7 1.09836 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.218 24.02.03 S5 SPT SUMINISTRO E INSTALACIÓN DE CONDUCTOR DE COBRE DESNUDO 16 m 65.99% 0.2 1.97 22/01/2022 04/02/2022 14.00 14.00 0.14 1.97 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1407 0.1407 0.1407 0.1407 0.1407 0.1407 0.84 0.437678 0.15 0.1407 0.1407 0.1407 0.1407 0.1407 0.1407 0.1407 0.99 0.510624 0.17 0.1407 0 0 0 0 0 0 0.140.072946 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.219 24.02.04 S5 SPT SUMINISTRO E INSTALACIÓN DE CINTA SEÑALIZADORA PARA CONDUCTO m 3.10% 0.2 604.27 22/01/2022 04/02/2022 14.00 14.00 43.16 604.27 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 43.162 43.162 43.162 43.162 43.162 43.162 259 23.30756 0.42 43.162 43.162 43.162 43.162 43.162 43.162 43.162 302 27.19215 0.49 43.162 0 0 0 0 0 0 43.23.884593 0.07 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2456.220 24.02.05 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.2 23.00 11/02/2022 17/02/2022 7.00 7.00 3.29 23.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.2857 3.2857 3.2857 3.2857 3.2857 3.2857 3.2857 23 9.8118 0.98 0 0 0 0 0 0 0 0 - 0
2456.221 24.02.06 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.2 0.60 11/02/2022 17/02/2022 7.00 7.00 0.09 0.60 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0857 0.0857 0.0857 0.0857 0.0857 0.0857 0.0857 0.6 55.2 1 0 0 0 0 0 0 0 0 - 0
2456.222 24.02.07 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.2 4.40 11/02/2022 17/02/2022 7.00 7.00 0.63 4.40 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.6286 0.6286 0.6286 0.6286 0.6286 0.6286 0.6286 4.4 323.84 1 0 0 0 0 0 0 0 0 - 0
2456.223 24.02.08 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.2 2.00 11/02/2022 17/02/2022 7.00 7.00 0.29 2.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2857 0.2857 0.2857 0.2857 0.2857 0.2857 0.2857 2 2.88 0.96 0 0 0 0 0 0 0 0 - 0
2456.224 24.02.09 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.2 1.20 11/02/2022 17/02/2022 7.00 7.00 0.17 1.20 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1714 0.1714 0.1714 0.1714 0.1714 0.1714 0.1714 1.2 1.2288 1.23 0 0 0 0 0 0 0 0 - 0
2456.225 24.02.10 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.2 0.40 11/02/2022 17/02/2022 7.00 7.00 0.06 0.40 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0571 0.0571 0.0571 0.0571 0.0571 0.0571 0.0571 0.4 2.56 0.85 0 0 0 0 0 0 0 0 - 0
2456.226 24.02.11 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.2 6.20 11/02/2022 17/02/2022 7.00 7.00 0.89 6.20 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.8857 0.8857 0.8857 0.8857 0.8857 0.8857 0.8857 6.2 9.176 1.02 0 0 0 0 0 0 0 0 - 0
2456.227 24.02.12 S5 SPT SUMINISTRO E INSTALACIÓN DE CONEXIÓN CON SOLDADURA EXOTÉRMI GLB 0.00% 0.2 0.20 11/02/2022 17/02/2022 7.00 7.00 0.03 0.20 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0.0286 0.0286 0.0286 0.0286 0.0286 0.0286 0.0286 0.2 0.256 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2456.228 24.02.13 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.2 1.20 11/02/2022 17/02/2022 7.00 7.00 0.17 1.20 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1714 0.1714 0.1714 0.1714 0.1714 0.1714 0.1714 1.2 2.36796 1.18 0 0 0 0 0 0 0 0 - 0
2456.229 24.02.14 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.2 2.80 11/02/2022 17/02/2022 7.00 7.00 0.40 2.80 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4 0.4 0.4 0.4 0.4 0.4 0.4 2.8 6.90676 0.99 0 0 0 0 0 0 0 0 - 0
2456.230 24.02.15 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.2 19.00 11/02/2022 17/02/2022 7.00 7.00 2.71 19.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.7143 2.7143 2.7143 2.7143 2.7143 2.7143 2.7143 19 35.15 1 0 0 0 0 0 0 0 0 - 0
2456.231 24.02.16 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUEST und 0.00% 0.2 0.80 11/02/2022 17/02/2022 7.00 7.00 0.11 0.80 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.1143 0.1143 0.1143 0.1143 0.1143 0.1143 0.1143 0.8 1.31544 1.32 0 0 0 0 0 0 0 0 - 0
2456.232 24.02.17 S5 SPT SUMINISTRO E INSTALACIÓN DE ACCESORIOS DE CONEXIÓN DE PUESTA und 0.00% 0.2 2.00 11/02/2022 17/02/2022 7.00 7.00 0.29 2.00 X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2857 0.2857 0.2857 0.2857 0.2857 0.2857 0.2857 2 2.96 0.99 0 0 0 0 0 0 0 0 - 0
2457 25 S5 IC INSTRUMENTACIÓN Y CONTROL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2458 25.01 S5 IC DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2459 25.01.01 S5 IC MOVIMIENTO DE TIERRAS PARA DUCTOS DE INSTRUMENTACIÓN Y CONTROL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2460 25.01.01.01 S5 IC EXCAVACIÓN CON MAQUINARIA DE ZANJAS PARA TENDIDO DE CABLE m3 83.78% 7.95 24/12/2021 10/01/2022 18.00 18.00 0.44 7.95 X X 0 0 0 0 0 0 0 0 0.00 0 0.4417 0.4417 0.4417 0.4417 0.4417 0.4417 0.4417 3.09 4.4902778 0.06 0.4417 0.4417 0.4417 0.4417 0.4417 0.4417 0.4417 3.09 4.4902778 0.06 0.4417 0.4417 0.4417 0.4417 0 0 0 1.7667 2.56587302 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2461 25.01.01.02 S5 IC REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 81.42% 6.87 24/12/2021 10/01/2022 18.00 18.00 0.38 6.87 X X 0 0 0 0 0 0 0 0 0.00 0 0.3817 0.3817 0.3817 0.3817 0.3817 0.3817 0.3817 2.67 0.3406375 0.07 0.3817 0.3817 0.3817 0.3817 0.3817 0.3817 0.3817 2.67 0.3406375 0.07 0.3817 0.3817 0.3817 0.3817 0 0 0 1.5267 0.19465 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2462 25.01.01.03 S5 IC TRANSPORTE DE MATERIAL APTO PARA RELLENO DM<=1 KM m3 -KM 86.70% 1.73 24/12/2021 10/01/2022 18.00 18.00 0.10 1.73 X X 0 0 0 0 0 0 0 0 0.00 0 0.0961 0.0961 0.0961 0.0961 0.0961 0.0961 0.0961 0.67 0.1042806 0.05 0.0961 0.0961 0.0961 0.0961 0.0961 0.0961 0.0961 0.67 0.1042806 0.05 0.0961 0.0961 0.0961 0.0961 0 0 0 0.3844 0.05958889 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2463 25.01.01.04 S5 IC TRANSPORTE DE MATERIAL APTO PARA RELLENO DM>1 KM (Hasta 6.8 KM
m3 -KM 86.70% 10.11 24/12/2021 10/01/2022 18.00 18.00 0.56 10.11 X X 0 0 0 0 0 0 0 0 0.00 0 0.5617 0.5617 0.5617 0.5617 0.5617 0.5617 0.5617 3.93 0.1441611 0.05 0.5617 0.5617 0.5617 0.5617 0.5617 0.5617 0.5617 3.93 0.1441611 0.05 0.5617 0.5617 0.5617 0.5617 0 0 0 2.2467 0.08237778 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2464 25.01.01.05 S5 IC RELLENO Y COMPACTACIÓN CON TIERRA CERNIDA m3 81.54% 1.85 24/12/2021 10/01/2022 18.00 18.00 0.10 1.85 X X 0 0 0 0 0 0 0 0 0.00 0 0.1028 0.1028 0.1028 0.1028 0.1028 0.1028 0.1028 0.72 2.5540278 0.07 0.1028 0.1028 0.1028 0.1028 0.1028 0.1028 0.1028 0.72 2.5540278 0.07 0.1028 0.1028 0.1028 0.1028 0 0 0 0.4111 1.45944444 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2465 25.01.01.06 S5 IC RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 77.75% 3.34 24/12/2021 10/01/2022 18.00 18.00 0.19 3.34 X X 0 0 0 0 0 0 0 0 0.00 0 0.1856 0.1856 0.1856 0.1856 0.1856 0.1856 0.1856 1.3 2.63025 0.09 0.1856 0.1856 0.1856 0.1856 0.1856 0.1856 0.1856 1.3 2.63025 0.09 0.1856 0.1856 0.1856 0.1856 0 0 0 0.7422 1.503 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2466 25.01.01.07 S5 IC ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 83.42% 7.29 24/12/2021 10/01/2022 18.00 18.00 0.41 7.29 X X 0 0 0 0 0 0 0 0 0.00 0 0.405 0.405 0.405 0.405 0.405 0.405 0.405 2.84 0.325458 0.07 0.405 0.405 0.405 0.405 0.405 0.405 0.405 2.84 0.325458 0.07 0.405 0.405 0.405 0.405 0 0 0 1.62 0.185976 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2467 25.01.01.08 S5 IC ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 83.42% 14.42 24/12/2021 10/01/2022 18.00 18.00 0.80 14.42 X X 0 0 0 0 0 0 0 0 0.00 0 0.8011 0.8011 0.8011 0.8011 0.8011 0.8011 0.8011 5.61 0.2618832 0.07 0.8011 0.8011 0.8011 0.8011 0.8011 0.8011 0.8011 5.61 0.2618832 0.07 0.8011 0.8011 0.8011 0.8011 0 0 0 3.2044 0.14964756 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2468 25.01.01.09 S5 IC APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 83.42% 7.29 24/12/2021 10/01/2022 18.00 18.00 0.41 7.29 X X 0 0 0 0 0 0 0 0 0.00 0 0.405 0.405 0.405 0.405 0.405 0.405 0.405 2.84 0.6657955 0.07 0.405 0.405 0.405 0.405 0.405 0.405 0.405 2.84 0.6657955 0.07 0.405 0.405 0.405 0.405 0 0 0 1.62 0.38045455 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2469 22.01.02 S5 IC CONCRETO SIMPLE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2470 25.01.02.01 S5 IC CONCRETO ARMADO EN BUZONES DE INSTRUMENTACION (430-MH) 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2471 25.01.02.01.01 S5 IC COLOCACIÓN DE CONCRETO F'c=20 MPa EN BUZONES ELÉCTRICOS m3 48.16% 6.22 24/12/2021 06/01/2022 14.00 14.00 0.44 6.22 X X 0 0 0 0 0 0 0 0 0.00 0 0.4443 0.4443 0.4443 0.4443 0.4443 0.4443 0.4443 3.11 19.208824 0.26 0.4443 0.4443
2508 25.02.01 S5 IC EQUIPOS Y DISPOSITIVOS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2509 25.02.01.01 S5 IC SUMINISTRO E INSTALACION DE EQUIPOS DE VOZ Y DATA. INCLUYE A und 0.00% 1.00 07/01/2022 28/01/2022 22.00 22.00 0.05 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.3182 0.72122273 0.36 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.32 0.721223 0.36 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.32 0.721223 0.36 0.0455 0 0 0 0 0 0 0.05 0.1030318 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2510 25.02.01.02 S5 IC SUMINISTRO E INSTALACIÓN DE GABINETE PARA TABLEROS DE COMU und 0.00% 1.00 07/01/2022 28/01/2022 22.00 22.00 0.05 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.3182 13.7793727 0.32 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.32 13.77937 0.32 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.32 13.77937 0.32 0.0455 0 0 0 0 0 0 0.05 1.9684818 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2511 25.02.01.03 S5 IC SUMINISTRO E INSTALACIÓN DE EQUIPOS DE SISTEMA CAMARA 975-CC und 0.00% 1.00 07/01/2022 28/01/2022 22.00 22.00 0.05 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.3182 2.70454545 0.3 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.32 2.704545 0.3 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.32 2.704545 0.3 0.0455 0 0 0 0 0 0 0.05 0.3863636 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2512 25.02.01.04 S5 IC SUMINISTRO E INSTALACIÓN DE EQUIPOS DE SISTEMA CAMARA 975-CC und 0.00% 1.00 07/01/2022 28/01/2022 22.00 22.00 0.05 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.3182 2.70454545 0.3 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.32 2.704545 0.3 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.0455 0.32 2.704545 0.3 0.0455 0 0 0 0 0 0 0.05 0.3863636 0.04 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2513 25.02.01.05 S5 IC SUMINISTRO E INSTALACIÓN DE SENSORES DE TRAMPAS DE GRASA und 0.00% 2.00 07/01/2022 28/01/2022 22.00 22.00 0.09 2.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0909 0.0909 0.0909 0.0909 0.0909 0.0909 0.0909 0.6364 29.0181818 0.32 0.0909 0.0909 0.0909 0.0909 0.0909 0.0909 0.0909 0.64 29.01818 0.32 0.0909 0.0909 0.0909 0.0909 0.0909 0.0909 0.0909 0.64 29.01818 0.32 0.0909 0 0 0 0 0 0 0.09 4.1454545 0.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2514 26 S5 CER CERCO PERIMÉTRICO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2515 26.01 S5 CER DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2516 26.01.01 S5 CER MOVIMIENTO DE TIERRAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2517 26.01.01.01 S5 CER EXCAVACION PARA DADOS DE ANCLAJE m3 66.65% 4.67 07/01/2022 20/01/2022 14.00 14.00 0.33 4.67 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.3336 0.3336 0.3336 0.3336 0.3336 0.3336 0.3336 2.335 14.477 0.17 0.3336 0.3336 0.3336 0.3336 0.3336 0.3336 0.3336 2.34 14.477 0.17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2518 26.01.01.02 S5 CER REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 59.18% 74.29 08/01/2022 21/01/2022 14.00 14.00 5.31 74.29 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.3064 5.3064 5.3064 5.3064 5.3064 5.3064 31.839 4.05941786 0.18 5.3064 5.3064 5.3064 5.3064 5.3064 5.3064 5.3064 37.1 4.735988 0.21 5.3064 0 0 0 0 0 0 5.31 0.67657 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2519 26.01.01.03 S5 CER ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 66.67% 6.00 07/01/2022 20/01/2022 14.00 14.00 0.43 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 3 0.3444 0.17 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 3 0.3444 0.17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2520 26.01.01.04 S5 CER ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 66.66% 11.67 07/01/2022 20/01/2022 14.00 14.00 0.83 11.67 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.8336 0.8336 0.8336 0.8336 0.8336 0.8336 0.8336 5.835 0.2724945 0.14 0.8336 0.8336 0.8336 0.8336 0.8336 0.8336 0.8336 5.84 0.272495 0.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2521 26.01.01.05 S5 CER APILADO DE MATERIAL EXCEDENTE EN BOTADERO m3 66.67% 6.00 07/01/2022 20/01/2022 14.00 14.00 0.43 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 3 0.70454545 0.18 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 0.4286 3 0.704545 0.18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2522 26.01.02 S5 CER SUMINISTRO DE COMBUSTIBLE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2523 26.01.02.01 S5 CER SUMINISTRO DE COMBUSTIBLE GLB 100.00% 0.00 10/12/2021 10/12/2021 1.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2524 26.01.03 S5 CER SUMINISTRO DE CONCRETO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2525 26.01.03.01 S5 CER SUMINISTRO DE CONCRETO F'c=20 MPa m3 28.57% 10.71 10/01/2022 23/01/2022 14.00 14.00 0.77 10.71 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.765 0.765 0.765 0.765 3.06 18.90009 0.2 0.765 0.765 0.765 0.765 0.765 0.765 0.765 5.36 33.07516 0.36 0.765 0.765 0.765 0 0 0 0 2.3 14.17507 0.15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2526 26.01.04 S5 CER CONCRETO SIMPLE 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2527 26.01.04.01 S5 CER CONCRETO SIMPLE PARA DADOS DE CONCRETO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2528 26.01.04.01.01 S5 CER COLOCACIÓN DE CONCRETO F'c=20 MPa m3 19.05% 12.14 10/01/2022 30/01/2022 21.00 21.00 0.58 12.14 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5781 0.5781 0.5781 0.5781 2.3124 14.2823529 0.15 0.5781 0.5781 0.5781 0.5781 0.5781 0.5781 0.5781 4.05 24.99412 0.27 0.5781 0.5781 0.5781 0.5781 0.5781 0.5781 0.5781 4.05 24.99412 0.27 0.5781 0.5781 0.5781 0 0 0 0 1.73 10.711765 0.12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2529 26.01.04.02 S5 CER CURADO DE CONCRETO CON ADITIVO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2530 26.01.04.02.01 S5 CER CURADO DE CONCRETO CON ANTISOL m2 4.76% 17.14 13/01/2022 02/02/2022 21.00 21.00 0.82 17.14 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.8162 0.8162 0.11222619 0.06 0.8162 0.8162 0.8162 0.8162 0.8162 0.8162 0.8162 5.71 0.785583 0.39 0.8162 0.8162 0.8162 0.8162 0.8162 0.8162 0.8162 5.71 0.785583 0.39 0.8162 0.8162 0.8162 0.8162 0.8162 0.8162 0 4.9 0.6733571 0.34 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2531 26.01.05 S5 CER ESTRUCTURAS METÁLICAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2532 26.01.05.01 S5 CER MONTAJE, INSTALACIÓN E IZAJE DE ESTRUCTURAS METÁLICAS NUEVAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2533 26.01.05.01.01 S5 CER INSTALACIÓN E IZAJE ACERO ESTRUCTURAL CERCO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2534 26.01.05.01.01.01 S5 CER ACERO ESTRUCTURAL TUBO DE F°G° Ø3" SCH40 kg 27.29% 1,041.18 08/01/2022 04/02/2022 28.00 28.00 37.19 1041.18 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 37.185 37.185 37.185 37.185 37.185 37.185 223.11 23.3487209 0.16 37.185 37.185 37.185 37.185 37.185 37.185 37.185 260 27.24017 0.18 37.185 37.185 37.185 37.185 37.185 37.185 37.185 260 27.24017 0.18 37.185 37.185 37.185 37.185 37.185 37.185 37.185 260 27.240174 0.18 37.185 0 0 0 0 0 0 37.23.891453 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2535 26.01.05.01.01.02 S5 CER ACERO ESTRUCTURAL TUBO DE F°G° Ø2" SCH40 kg 27.29% 3,844.09 08/01/2022 04/02/2022 28.00 28.00 137.29 3844.09 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 137.29 137.29 137.29 137.29 137.29 137.29 823.73 86.2046761 0.16 137.29 137.29 137.29 137.29 137.29 137.29 137.29 961 100.5721 0.18 137.29 137.29 137.29 137.29 137.29 137.29 137.29 961 100.5721 0.18 137.29 137.29 137.29 137.29 137.29 137.29 137.29 961 100.57212 0.18 137.29 0 0 0 0 0 0 13714.36745 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2536 26.01.05.01.01.03 S5 CER ACERO ESTRUCTURAL TUBO DE F°G° Ø1 1/2" SCH40 kg 27.10% 95.50 08/01/2022 04/02/2022 28.00 28.00 3.41 95.50 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.4107 3.4107 3.4107 3.4107 3.4107 3.4107 20.464 2.3552247 0.16 3.4107 3.4107 3.4107 3.4107 3.4107 3.4107 3.4107 23.9 2.747762 0.18 3.4107 3.4107 3.4107 3.4107 3.4107 3.4107 3.4107 23.9 2.747762 0.18 3.4107 3.4107 3.4107 3.4107 3.4107 3.4107 3.4107 23.9 2.7477621 0.18 3.4107 0 0 0 0 0 0 3.410.392537 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2537 26.01.05.01.01.04 S5 CER ACERO ESTRUCTURAL TUBO DE F°G° Ø1 1/4" SCH40 kg 27.10% 1,261.21 08/01/2022 04/02/2022 28.00 28.00 45.04 1261.21 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 45.043 45.043 45.043 45.043 45.043 45.043 270.26 31.1040099 0.16 45.043 45.043 45.043 45.043 45.043 45.043 45.043 315 36.28801 0.18 45.043 45.043 45.043 45.043 45.043 45.043 45.043 315 36.28801 0.18 45.043 45.043 45.043 45.043 45.043 45.043 45.043 315 36.288012 0.18 45.043 0 0 0 0 0 0 455.184002 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2538 26.01.05.01.01.05 S5 CER ACERO ESTRUCTURAL TUBO DE F°G° Ø1" SCH40 kg 27.05% 0.73 08/01/2022 04/02/2022 28.00 28.00 0.03 0.73 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0.0261 0.0261 0.0261 0.0261 0.0261 0.0261 0.1564 0.01800329 ### 0.0261 0.0261 0.0261 0.0261 0.0261 0.0261 0.0261 0.18 0.021004 ### 0.0261 0.0261 0.0261 0.0261 0.0261 0.0261 0.0261 0.18 0.021004 ### 0.0261 0.0261 0.0261 0.0261 0.0261 0.0261 0.0261 0.18 0.0210038 ### 0.0261 0 0 0 0 0 0 0.030.003001 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2539 26.01.05.01.01.06 S5 CER TEMPLADOR DE FIERRO LISO F°G° Ø3/8" SCH40 kg 52.75% 137.51 08/01/2022 04/02/2022 28.00 28.00 4.91 137.51 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.9111 4.9111 4.9111 4.9111 4.9111 4.9111 29.466 3.14428354 0.1 4.9111 4.9111 4.9111 4.9111 4.9111 4.9111 4.9111 34.4 3.668331 0.12 4.9111 4.9111 4.9111 4.9111 4.9111 4.9111 4.9111 34.4 3.668331 0.12 4.9111 4.9111 4.9111 4.9111 4.9111 4.9111 4.9111 34.4 3.6683308 0.12 4.9111 0 0 0 0 0 0 4.910.524047 0.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2540 26.01.05.01.01.07 S5 CER TEMPLADOR ALAMBRE F°G° N°8 kg 1.61% 124.96 22/01/2022 18/02/2022 28.00 28.00 4.46 124.96 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.4629 4.4629 4.4629 4.4629 4.4629 4.4629 26.8 4.819886 0.21 4.4629 4.4629 4.4629 4.4629 4.4629 4.4629 4.4629 31.2 5.6232 0.24 4.4629 4.4629 4.4629 4.4629 4.4629 4.4629 4.4629 31.2 5.6232 0.24 4.4629 4.4629 4.4629 4.4629 4.4629 4.4629 4.4629 31.2 5.6232 0.24 4.4629 0 0 0 0 0 0 4.46 0.80 0.03493
2541 26.01.05.01.01.08 S5 CER PLATINA ZINCADA 3/16"x3/4" kg 39.54% 221.90 22/01/2022 18/02/2022 28.00 28.00 7.93 221.90 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.925 7.925 7.925 7.925 7.925 7.925 47.6 6.078835 0.13 7.925 7.925 7.925 7.925 7.925 7.925 7.925 55.5 7.0919744 0.15 7.925 7.925 7.925 7.925 7.925 7.925 7.925 55.57.091974 0.15 7.925 7.925 7.925 7.925 7.925 7.925 7.925 55.5 7.09197 0.15 7.925 0 0 0 0 0 0 7.93 1.01 0.02156
2542 26.01.05.01.01.09 S5 CER PLANCHA DE ACERO ZINCADO 3/16" kg 28.18% 11.49 22/01/2022 18/02/2022 28.00 28.00 0.41 11.49 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.4104 0.4104 0.4104 0.4104 0.4104 0.4104 2.46 0.221593 0.22 0.4104 0.4104 0.4104 0.4104 0.4104 0.4104 0.4104 2.87 0.258525 0.26 0.4104 0.4104 0.4104 0.4104 0.4104 0.4104 0.4104 2.870.258525 0.26 0.4104 0.4104 0.4104 0.4104 0.4104 0.4104 0.4104 2.87 0.25853 0.26 0.4104 0 0 0 0 0 0 0.41 0.04 0.03693
2543 26.01.05.01.01.10 S5 CER INSTALACION DE CONCERTINA m 2.87% 564.32 22/01/2022 18/02/2022 28.00 28.00 20.15 564.32 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20.154 20.154 20.154 20.154 20.154 20.154 121 64.49371 0.21 20.154 20.154 20.154 20.154 20.154 20.154 20.154 141 75.242667 0.24 20.154 20.154 20.154 20.154 20.154 20.154 20.154 14175.24267 0.24 20.154 20.154 20.154 20.154 20.154 20.154 20.154 141 75.2427 0.24 20.154 0 0 0 0 0 0 20.2 10.75 0.03467
2544 26.01.05.01.01.11 S5 CER ACCESORIOS PARA POSTE DE CERCO GLB 51.05% 0.49 22/01/2022 18/02/2022 28.00 28.00 0.02 0.49 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0175 0.0175 0.0175 0.0175 0.0175 0.0175 0.11 0.462 0.12 0.0175 0.0175 0.0175 0.0175 0.0175 0.0175 0.0175 0.12 0.539 0.13 0.0175 0.0175 0.0175 0.0175 0.0175 0.0175 0.0175 0.12 0.539 0.13 0.0175 0.0175 0.0175 0.0175 0.0175 0.0175 0.0175 0.12 0.539 0.13 0.0175 0 0 0 0 0 0 0.02 0.08 0.01925
2545 26.01.05.01.01.12 S5 CER ACCESORIOS PARA PUERTA GLB 48.63% 0.51 22/01/2022 18/02/2022 28.00 28.00 0.02 0.51 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0182 0.0182 0.0182 0.0182 0.0182 0.0182 0.11 0.480857 0.12 0.0182 0.0182 0.0182 0.0182 0.0182 0.0182 0.0182 0.13 0.561 0.14 0.0182 0.0182 0.0182 0.0182 0.0182 0.0182 0.0182 0.13 0.561 0.14 0.0182 0.0182 0.0182 0.0182 0.0182 0.0182 0.0182 0.13 0.561 0.14 0.0182 0 0 0 0 0 0 0.02 0.08 0.02004
2546 26.01.05.01.01.13 S5 CER MALLA GALVANIZADA #8 - 2"x2" kg 24.30% 5,737.30 22/01/2022 18/02/2022 28.00 28.00 204.90 5737.30 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 204.9 204.9 204.9 204.9 204.9 204.9 1229 287.7369 0.16 204.9 204.9 204.9 204.9 204.9 204.9 204.9 1434 335.69309 0.19 204.9 204.9 204.9 204.9 204.9 204.9 204.9 1434335.6931 0.19 204.9 204.9 204.9 204.9 204.9 204.9 204.9 1434 335.693 0.19 204.9 0 0 0 0 0 0 205 47.96 0.02703
2547 26.01.05.01.01.14 S5 CER SUMINISTRO, INSTALACION DE ALAMBRE DE PUAS N° 14 m 7.45% 2,319.35 22/01/2022 18/02/2022 28.00 28.00 82.83 2319.35 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 82.834 82.834 82.834 82.834 82.834 82.834 497 39.9054 0.2 82.834 82.834 82.834 82.834 82.834 82.834 82.834 580 46.556296 0.23 82.834 82.834 82.834 82.834 82.834 82.834 82.834 580 46.5563 0.23 82.834 82.834 82.834 82.834 82.834 82.834 82.834 580 46.5563 0.23 82.834 0 0 0 0 0 0 82.8 6.65 0.03309
2548 26.01.05.02 S5 CER INSTALACIÓN E IZAJE DE ACERO ESTRUCTURAL PERNOS, ARANDELAS Y ANCLAJES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2549 26.01.05.02.01 S5 CER INSTALACIÓN DE ACERO ESTRUCTURAL PERNERIA, ARANDELAS Y A kg 50.37% 420.88 22/01/2022 18/02/2022 28.00 28.00 15.03 420.88 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15.031 15.031 15.031 15.031 15.031 15.031 90.2 7.989145 0.11 15.031 15.031 15.031 15.031 15.031 15.031 15.031 105 9.3206693 0.12 15.031 15.031 15.031 15.031 15.031 15.031 15.031 1059.320669 0.12 15.031 15.031 15.031 15.031 15.031 15.031 15.031 105 9.32067 0.12 15.031 0 0 0 0 0 0 15 1.33 0.01775
2550 26.01.05.03 S5 CER PINTURA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2551 26.01.05.03.01 S5 CER PINTURA DE ELEMENTOS METALICOS m2 25.00% 2,619.00 08/01/2022 04/02/2022 28.00 28.00 93.54 2619.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 93.536 93.536 93.536 93.536 93.536 93.536 561.21 245.53125 0.16 93.536 93.536 93.536 93.536 93.536 93.536 93.536 655 286.4531 0.19 93.536 93.536 93.536 93.536 93.536 93.536 93.536 655 286.4531 0.19 93.536 93.536 93.536 93.536 93.536 93.536 93.536 655 286.45313 0.19 93.536 0 0 0 0 0 0 93.540.92188 0.03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2552 27 S5 PRE COMISIONAMIENTO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2553 27.01 PRECOM
PRECOM
PRE COMISIONAMIENTO DE EQUIPOS GLB 0.00% 1.00 26/12/2021 01/01/2022 7.00 7.00 0.14 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0.1429 0.1429 0.1429 0.1429 0.1429 0.71 550 0.71 0.1429 0.1429 0 0 0 0 0 0.29 220 0.29 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2554 28 S5 COMISIONAMIENTO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2555 28.01 COM COM COMISIONAMIENTO DE EQUIPOS GBL 0.00% 1.00 02/01/2022 06/01/2022 5.00 5.00 0.20 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0.2 0.2 0.2 0.2 0.2 1 770 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2556 29 SDC ADICIONALES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
X SDC X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2557 SDC RED DE DRENAJE SUPERFICIAL (IDT 1) 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2558 SDC OBRAS PRELIMINARES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2559 SDC SEÑALIZACION DE LA ZONA DE TRABAJO 0.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2560 SDC SDC01 SEÑALIZACION DE LA ZONA DE TRABAJO GLB 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 750 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2561 SDC SDC01 TRAZO Y REPLANTEO GLB 0.00% 1.00 07/01/2022 07/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 600 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2562 SDC DISCIPLINA: CIVIL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2563 SDC MOVIMIENTO DE TIERRAS PARA TUBERÍAS, CANALES Y BUZONES - RED DE DRENAJE SUPERFICIAL 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2564 SDC SDC01EXCAVACION CON EQUIPOS m3 0.00% 257.87 07/01/2022 13/01/2022 7.00 7.00 36.84 257.87 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 36.839 36.839 36.839 36.839 36.839 36.839 36.839 257.87 393.25175 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2565 SDC SDC01TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM<=1 KM m3 -KM 0.00% 24.32 07/01/2022 13/01/2022 7.00 7.00 3.47 24.32 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.4743 3.4743 3.4743 3.4743 3.4743 3.4743 3.4743 24.32 3.7696 0.94 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2566 SDC SDC01TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM>1 KM (Hasta
m3 -KM 0.00% 165.38 07/01/2022 13/01/2022 7.00 7.00 23.63 165.38 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23.626 23.626 23.626 23.626 23.626 23.626 23.626 165.38 6.06393333 1.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2567 SDC SDC01COLOCACION DE CAMA DE APOYO PARA TUBERÍA m3 0.00% 24.32 14/01/2022 20/01/2022 7.00 7.00 3.47 24.32 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.4743 3.4743 3.4743 3.4743 3.4743 3.4743 3.4743 24.3 83.09333 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2568 SDC SDC01REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 0.00% 695.90 07/01/2022 13/01/2022 7.00 7.00 99.41 695.90 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 99.414 99.414 99.414 99.414 99.414 99.414 99.414 695.9 88.72725 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2569 SDC SDC01TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3 -KM 0.00% 118.42 07/01/2022 13/01/2022 7.00 7.00 16.92 118.42 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16.917 16.917 16.917 16.917 16.917 16.917 16.917 118.42 18.3551 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2570 SDC SDC01TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KM Ref.) m3 -KM 0.00% 805.26 07/01/2022 13/01/2022 7.00 7.00 115.04 805.26 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 115 115 115 115 115 115 115 805.26 29.5262 0.98 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2571 SDC SDC01RELLENO CON MATERIAL 2B DE PRESTAMO m3 0.00% 118.42 20/01/2022 26/01/2022 7.00 7.00 16.92 118.42 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16.917 16.9 30.02793 0.14 16.917 16.917 16.917 16.917 16.917 16.917 0 102 180.1676 0.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2572 SDC SDC01RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 0.00% 58.92 20/01/2022 26/01/2022 7.00 7.00 8.42 58.92 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.4171 8.42 17.0868 0.14 8.4171 8.4171 8.4171 8.4171 8.4171 8.4171 0 50.5 102.5208 0.85 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2573 SDC SDC01ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3 -KM 0.00% 141.74 07/01/2022 13/01/2022 7.00 7.00 20.25 141.74 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20.249 20.249 20.249 20.249 20.249 20.249 20.249 141.74 16.2738519 1.02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2574 SDC SDC01ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3 -KM 0.00% 1,275.63 07/01/2022 13/01/2022 7.00 7.00 182.23 1275.63 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 182.23 182.23 182.23 182.23 182.23 182.23 182.23 1276 59.5294 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2575 SDC SDC01MEJORAMIENTO CON MATERIAL GRANULAR m3 0.00% 62.88 14/01/2022 20/01/2022 7.00 7.00 8.98 62.88 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.9829 8.9829 8.9829 8.9829 8.9829 8.9829 8.9829 62.9 38.9856 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2576 SDC SDC01EXCAVACION PARA BUZONES m3 0.00% 54.65 14/01/2022 20/01/2022 7.00 7.00 7.81 54.65 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.8071 7.8071 7.8071 7.8071 7.8071 7.8071 7.8071 54.7 83.34125 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2577 SDC CONCRETO SIMPLE PARA BUZONES DE AGUAS NEGRAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2578 SDC SDC01COLOCACIÓN DE SOLADO DE CONCRETO F'c=10 Mpa m3 0.00% 0.86 21/01/2022 21/01/2022 1.00 1.00 0.86 0.86 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.86 0 0 0 0 0 0 0.86 5.311765 1.06 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2579 SDC CONCRETO ARMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2580 SDC SDC01COLOCACIÓN DE CONCRETO F'c=20 Mpa m3 0.00% 11.52 24/01/2022 24/01/2022 1.00 1.00 11.52 11.52 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11.52 0 0 0 11.5 71.15294 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2581 SDC SDC01ENCOFRADO CARAVISTA Y DESENCOFRADO m2 0.00% 71.52 14/01/2022 14/01/2022 1.00 1.00 71.52 71.52 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 71.52 0 0 0 0 0 0 71.5 176.6965 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2582 SDC SDC01SUMINISTRO, HABILITACIÓN Y COLOCACIÓN DE ACERO DE REFUERZO f`y=420 kg 0.00% 902.01 22/01/2022 23/01/2022 2.00 2.00 451.01 902.01 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 451 451 0 0 0 0 902 105.2345 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2583 SDC CARPINTERIA METÁLICA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2584 SDC SDC01SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 1.35m x 1.35m INC. ACCESO und 0.00% 4.00 25/01/2022 25/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 4 27 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2585 SDC SDC01SUMINISTRO E INSTALACIÓN DE TAPA METÁLICA 3.20m x 2.20m INC. ACCESO und 0.00% 1.00 25/01/2022 25/01/2022 1.00 1.00 1.00 1.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 14 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2586 SDC DISCIPLINA INSTALACIONES SANITARIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2587 SDC INSTALACIÓN DE RED DE DRENAJE SUPERFICIAL - INSTALACIÓN 975-SD-18"-MOE03U-100031/100032/100033/100034 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2588 SDC SDC01Pipe, PE D3350, Bell, Spg/End Ø 18" m 0.00% 127.00 14/01/2022 16/01/2022 3.00 3.00 42.33 127.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 42.333 42.333 42.333 0 0 0 0 127 183.1731 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2589 SDC INSTALACIÓN DE RED DE DRENAJE SUPERFICIAL - INSTALACIÓN 975-SD-24"-MOE03U-100036 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2590 SDC SDC01Pipe, PE D3350, Bell, Spg/End Ø 24" m 0.00% 4.00 17/01/2022 17/01/2022 1.00 1.00 4.00 4.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 4 5.769231 0.96 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2591 SDC INSTALACIÓN DE RED DE DRENAJE SUPERFICIAL - INSTALACIÓN 975-SD-12"-MOE03U-100035 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2592 SDC SDC01Pipe, PE D3350, PE, SDR21 Ø 12" m 0.00% 20.00 18/01/2022 18/01/2022 1.00 1.00 20.00 20.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 0 0 20 28.84615 0.99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2593 SDC CONEXIONADO DE TUBERIAS 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2594 SDC SDC01CONEXIONADO DE TUBERIAS SDR Ø 18",Ø 24",Ø 12" und 0.00% 12.00 19/01/2022 19/01/2022 1.00 1.00 12.00 12.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 0 12 66 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2595 SDC IDT_02_CORTE DE TUBERIA Y PLATAFORMA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2596 SDC OBRAS PRELIMINARES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2597 SDC SDC06 SEÑALIZACION DE LA ZONA DE TRABAJO GLB 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2598 SDC IDT02 MOVILIZACION Y DESMOVILIZACION GLB 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2599 SDC SDC06 TRAZO Y REPLANTEO GLB 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2600 SDC IDT 02. PARTE 1 - TUBERIA EXPUESTA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2601 SDC SDC06EXCAVACION CON EQUIPOS M3 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2602 SDC SDC06CORTE DE TUBERIA - SUPERIOR UND 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2603 SDC SDC06CORTE DE TUBERIA - INFERIOR UND 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2604 SDC SDC06TRASLADO DE TUBERIAS A ALMACEN DE CLIENTE viaje 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2605 SDC SDC06CAPACITACION DE AISLAMIENTOS, BLOQUEO Y SEÑALIZACION GLB 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2606 SDC SDC06BLOQUEO DE TUBERIA - INFERIOR (COLOCACION DE BRIDA CIEGA) GLB 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2607 SDC SDC06BLOQUEO DE TUBERIA - SUPERIOR (COLOCACION DE BRIDA CIEGA) GLB 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2608 SDC SDC06SELLADO DE TUBERIA - INFERIOR - INCL. DADO DE CONCRETO UND 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2609 SDC SDC06SELLADO DE TUBERIA - SUPERIOR - INCL. DADO DE CONCRETO UND 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2610 SDC SDC06TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3-km 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2611 SDC SDC06TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KM Ref.) m3-km 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2612 SDC SDC06RELLENO CON MATERIAL 2B DE PRESTAMO M3 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2613 SDC IDT02 PRUEBAS DE CALIDAD GLB 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2614 SDC IDT 02. PARTE 2- PLATAFORMADO 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2615 SDC SDC06EXCAVACION CON EQUIPOS M3 80.00% 139.60 07/01/2022 07/01/2022 1.00 1.00 139.60 139.60 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 139.6 0 0 0 0 0 0 139.6 212.89 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2616 SDC SDC06ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3-km 80.00% 544.44 07/01/2022 07/01/2022 1.00 1.00 544.44 544.44 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 544.44 0 0 0 0 0 0 544.44 25.4072 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2617 SDC SDC06ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3-km 80.00% 181.48 07/01/2022 07/01/2022 1.00 1.00 181.48 181.48 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 181.48 0 0 0 0 0 0 181.48 20.8365926 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2618 SDC SDC06TRANSPORTE DE MATERIAL GRANULAR TIPO 3B DM < = 1KM m3-km 80.00% 124.80 07/01/2022 07/01/2022 1.00 1.00 124.80 124.80 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 124.8 0 0 0 0 0 0 124.8 21.4933333 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2619 SDC SDC06TRANSPORTE DE MATERIAL GRANULAR TIPO 3B DM > 1KM (Hasta 6.8 KM Ref.) m3-km 80.00% 848.64 07/01/2022 07/01/2022 1.00 1.00 848.64 848.64 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 848.64 0 0 0 0 0 0 848.64 35.904 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2620 SDC SDC06RELLENO CON MATERIAL 3B DE PRESTAMO M3 80.00% 124.80 07/01/2022 07/01/2022 1.00 1.00 124.80 124.80 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 124.8 0 0 0 0 0 0 124.8 233.178947 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2621 SDC IDT02 ENSAYOS DE MATERIAL 3B GLB 80.00% 0.20 07/01/2022 07/01/2022 1.00 1.00 0.20 0.20 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0.2 0 0 0 0 0 0 0.2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2622 SDC SDC06TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3-km 80.00% 15.60 07/01/2022 07/01/2022 1.00 1.00 15.60 15.60 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15.6 0 0 0 0 0 0 15.6 2.418 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2623 SDC SDC06TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KM Ref.) m3-km 80.00% 106.08 07/01/2022 07/01/2022 1.00 1.00 106.08 106.08 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 106.08 0 0 0 0 0 0 106.08 3.8896 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2624 SDC SDC06RELLENO CON MATERIAL 2B DE PRESTAMO M3 80.00% 15.60 07/01/2022 07/01/2022 1.00 1.00 15.60 15.60 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15.6 0 0 0 0 0 0 15.6 27.69 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2625 SDC SDC06PRUEBAS DE COMPACTACIÓN, DE SELECCIÓN DE MATERIAL,ETC. GLB 80.00% 0.20 07/01/2022 07/01/2022 1.00 1.00 0.20 0.20 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0.2 0 0 0 0 0 0 0.2 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2626 SDC IDT_03_SUBDREN 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2627 SDC OBRAS PRELIMINARES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2628 SDC SDC10 SEÑALIZACION DE LA ZONA DE TRABAJO GLB 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2629 SDC SDC10 TRAZO Y REPLANTEO GLB 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2630 SDC IDT 02. PARTE 1 - TUBERIA EXPUESTA 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2631 SDC SDC10EXCAVACION CON EQUIPOS M3 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2632 SDC SDC10ELIMINACION DE MATERIAL EXCEDENTE DM>1 KM (Hasta 3.0 KM Ref.) m3-km 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2633 SDC SDC10ELIMINACION DE MATERIAL EXCEDENTE DM < = 1KM m3-km 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2634 SDC SDC10TRANSPORTE DE MATERIAL GRANULAR PARA CAMA A APOYO DM <= 1 KM m3-km 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2635 SDC SDC10TRANSPORTE DE MATERIAL GRANULAR PARA CAMA DE APOYO DM>1 KM (Hasta
m3-km 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2636 SDC SDC10TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM < = 1KM m3-km 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2637 SDC SDC10TRANSPORTE DE MATERIAL GRANULAR TIPO 2B DM > 1KM (Hasta 6.8 KM Ref.) m3-km 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2638 SDC SDC10TRANSPORTE DE MATERIAL GRANULAR TIPO 3B DM < = 1KM m3-km 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2639 SDC SDC10TRANSPORTE DE MATERIAL GRANULAR TIPO 3B DM > 1KM (Hasta 6.8 KM Ref.) m3-km 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2640 SDC SDC10BOMBEO DE AGUA EN TERRENO SATURADO CON MOTOBOMBA Dias 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2641 SDC SDC10REFINE, NIVELACION Y PERFILADO DEL TERRENO M2 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2642 SDC SDC10TRASLADO DE TUBERIAS Y GEOTEXTIL viaje 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2643 SDC SDC10INSTALACIÓN DE GEOTEXTIL M2 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2644 SDC SDC10COLOCACION DE CAMA DE APOYO PARA TUBERÍA M3 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2645 SDC SDC10COLOCACION DE TUBERIA HDPE 12" M 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2646 SDC SDC10RELLENO CON MATERIAL 3B M3 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2647 SDC SDC10RELLENO CON MATERIAL 2B M3 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2648 SDC IDT03 PRUEBAS GLB 100.00% 0.00 1.00 #DIV/0! 0.00 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2649 SDC MICROCLIMAS SDC09 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2650 SDC OBRAS PRELIMINARES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2651 SDC SDC08MODULO D GLB 86.88% 1.58 17/12/2021 17/12/2021 1.00 1.00 1.58 1.58 X X 1.58 0 0 0 0 0 0 1.58 79.00 0.13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2652 SDC SDC08MODULO B GLB 0.00% 8.00 21/01/2022 24/01/2022 4.00 4.00 2.00 8.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 2 0 0 0 8 320 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2653 SDC SDC08MODULO C GLB 0.00% 3.00 15/01/2022 18/01/2022 4.00 4.00 0.75 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.75 0.75 0.75 0.75 0 0 3 120 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2654 SDC SDC08MODULO E GLB 30.00% 10.50 22/01/2022 25/01/2022 4.00 4.00 2.63 10.50 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.625 2.625 2.625 2.625 0 0 10.5 420 0.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2655 SDC SDC08MODULO T GLB 55.00% 1.80 29/12/2021 01/01/2022 4.00 4.00 0.45 1.80 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0.45 0.45 0.9 36 0.23 0.45 0.45 0 0 0 0 0 0.9 36 0.23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2656 SDC SDC08MODULO A GLB 30.00% 10.50 19/01/2022 22/01/2022 4.00 4.00 2.63 10.50 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.625 2.625 5.25 210 0.35 2.625 2.625 0 0 0 0 0 5.25 210 0.35 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2657 SDC SDC08MODULO OYP GLB 100.00% 0.00 28/11/2021 01/12/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2658 SDC SDC08MODULO M GLB 100.00% 0.00 05/12/2021 08/12/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2659 SDC SDC08MODULO N GLB 0.00% 3.00 29/12/2021 01/01/2022 4.00 4.00 0.75 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0.75 0.75 1.5 60 0.5 0.75 0.75 0 0 0 0 0 1.5 60 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2660 SDC SDC08MODULO S GLB 100.00% 0.00 17/12/2021 20/12/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2661 SDC SDC08MODULO R GLB 0.00% 3.00 17/01/2022 20/01/2022 4.00 4.00 0.75 3.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.75 0.75 0.75 0.75 3 120 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2662 SDC SDC08MODULO L GLB 0.00% 15.00 24/02/2022 27/02/2022 4.00 4.00 3.75 3.75 -11.25 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.75 3.75 150.00 0.25
2663 SDC SDC08MODULO K2 GLB 100.00% 0.00 20/11/2021 23/11/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2664 SDC SDC08MODULO K1 GLB 100.00% 0.00 19/11/2021 22/11/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2665 SDC SDC08MODULO F GLB 70.00% 1.80 06/01/2022 09/01/2022 4.00 4.00 0.45 1.80 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.45 0.45 18 0.08 0.45 0.45 0.45 0 0 0 0 1.35 54 0.23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2666 SDC SDC08MODULO G GLB 100.00% 0.00 23/11/2021 26/11/2021 4.00 4.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2667 SDC SDC08MODULO H GLB 0.00% 6.00 05/01/2022 08/01/2022 4.00 4.00 1.50 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.5 1.5 3 120 0.5 1.5 1.5 0 0 0 0 0 3 120 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2668 SDC SDC08MODULO I GLB 0.00% 6.00 15/01/2022 18/01/2022 4.00 4.00 1.50 6.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.5 1.5 1.5 1.5 0 0 6 240 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2669 SDC SDC08REDES ELECTRICAS GLB 10.00% 18.00 23/01/2022 26/01/2022 4.00 4.00 4.50 18.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.5 4.5 4.5 4.5 0 18 720 0.9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2670 SDC SDC08CANAL PERIMETRAL GLB 0.00% 15.00 02/02/2022 05/02/2022 4.00 4.00 3.75 15.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.75 3.75 7.5 375 0.5 3.75 3.75 0 0 0 0 0 7.5 375 0.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2671 SDC SDC08CERCO PERIMÉTRICO INTERIOR GLB 0.00% 20.00 31/01/2022 03/02/2022 4.00 4.00 5.00 20.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 5 5 5 20 800 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2672 SDC SDC08CERCO PERIMÉTRICO EXTERIOR GLB 0.00% 20.00 31/01/2022 03/02/2022 4.00 4.00 5.00 20.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 5 5 5 20 800 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
2673 SDC IDT_TALUD 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2674 SDC OBRAS PRELIMINARES 0 X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 0 ### 0 0 0 0 0 0 0 0 - #DIV/0!
2675 SDC SDC19Trabajos de IDT Talud GLB 100.00% 0.00 15.00 1.00 0.00 0.00 X X 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0
Semana:
35 Fri Sat Sun Mon Tue Wed Thu
ITEM DISCIPLINA / CARGO 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec
1.00 CIVIL 84 83 83 83 83 83 72
CAPATAZ 2 2 2 2 2 2 1
OFICIAL CIVIL - ALBAÑIL 11 11 11 11 11 11 9
OFICIAL CIVIL - ANDAMIERO 2 2 2 2 2 2 2
OFICIAL CIVIL - CARPINTERO 7 7 7 7 7 7 5
OFICIAL CIVIL - FIERRERO 3 3 3 3 3 3 4
OFICIAL CIVIL - TOPOGRAFIA 1 1 1 1 1 1 1
OFICIAL DE MOVIMIENTO DE TIERRA 2 2 2 2 2 2 1
OPERARIO CIVIL - ALBAÑIL 12 12 12 12 12 12 10
OPERARIO CIVIL - ANDAMIERO 2 2 2 2 2 2 1
OPERARIO CIVIL - CARPINTERO 8 8 8 8 8 8 6
OPERARIO CIVIL - FIERRERO 8 8 8 8 8 8 7
PEÓN 26 25 25 25 25 25 25
2.00 ELECTRICIDAD AYH 6 6 6 6 6 6 7
OFICIAL ELECTRICISTA 3 3 3 3 3 3 4
OPERARIO ELECTRICISTA 1 1 1 1 1 1 1
AYUDANTE 2 2 2 2 2 2 2
3.00 EQUIPOS 15 12 12 12 12 12 12
OPERADOR MANLIFT 2 2 2 2 2 2 2
OPERADOR DE CAMIÓN GRÚA 2 2 2 2 2 2 2
OPERADOR DE VOLQUETE 3 3 3 3 3 3 2
OPERADOR MULTIPLE 4 1 1 1 1 1 2
RIGGER 3 3 3 3 3 3 2
TECNICO DE MANTENIMIENTO 1 1 1 1 1 1 2
4.00 ESTRUCTURAS 14 14 14 14 14 14 11
OFICIAL MECANICO - MONTAJISTA 5 5 5 5 5 5 4
OPERARIO MECANICO - MONTAJISTA 8 8 8 8 8 8 6
OPERARIO MECANICO - SOLDADOR 1 1 1 1 1 1 1
5.00 LINIERO AYH 2 2 2 2 2 2 2
OPERARIO LINIERO 2 2 2 2 2 2 2
6.00 SANITARIA 5 5 5 5 5 5 4
OFICIAL CIVIL - TUBERO 4 4 4 4 4 4 3
OPERARIO DE TERMOFUSIÓN 1 1 1 1 1 1 1
7.00 SOPORTE 2 2 2 2 2 2 2
OPERARIO CIVIL - ANDAMIERO 2 2 2 2 2 2 2
8.00 TOPOGRAFIA 1 1 1 1 1 1 1
AYUDANTE TOPOGRAFÍA 1 1 1 1 1 1 1
TOTAL 129 125 125 125 125 125 111
SECTOR MÓDULO ACTIVIDAD COMPROMISO
S2 A Red AA.PP 100037 al 75% 23-Dec
S2 A Red AA.PP 100038 al 100% 23-Dec
S2 A Red AA.PP 100044-100049 al 100% 23-Dec
S2 A Red AA.PP 100040 al 100% 23-Dec
S1 D,B,K1 Red AA.GG línea 3 al 75% 23-Dec
S1 D Sardinel al 100% 23-Dec
S1 E Fundación liberada, incluye uña para losa 23-Dec
S1 E Inicio de encofrado y acero para losa de rampa 23-Dec
S4 G Montaje de estructuras (contenedores, porticos y parte de la cobertura) 23-Dec
S3 N Lijado, pintado de estructura desmontada, Estructura debe llegar a obra el 27/12 23-Dec
S3 OyP Lijado, pintado de estructura desmontada, Estructura debe llegar a obra el 27/12 23-Dec
S3 S Montaje de estructura metálica al 100% 22-Dec
S1 B Bancoducto hacia poste 14 al 100% 23-Dec
S1 C Bancoducto hacia módulo C al 100% 23-Dec
S2 T MANHOLE 1002 AL 100% 23-Dec
S4 F MANHOLE 1006 AL 100% 23-Dec
S2 A MANHOLE 1008 AL 100% 23-Dec
S2 A MANHOLE 1010 AL 100% 23-Dec
S2 A, T Malla a tierra al 90% 23-Dec
S4 F Malla a tierra al 70% 23-Dec
Data EV % LB0
ACTIVITY ID Sum - HHCON
Sum - HHPROSum - HH G Sum - HH G #VALUE! #VALUE!
C1000 1,495.99 1,495.99 1,303.38 1,303.38 0 87.12%
C1200 1,899.58 1,899.58 1,698.34 1,698.34 0 89.41%
C1210 1,740.61 1,740.61 314.35 314.35 0 18.06%
C1300 25.00 25.00 25.00 25.00 0 100.00%
C1310 457.00 457.00 457.00 457.00 0 100.00%
C1320 888.55 888.55 424.83 424.83 0 47.81%
C1330 123.00 123.00 123.00 123.00 0 100.00%
C1340 22.00 22.00 - - 0 0.00%
C1350 1,876.00 1,876.00 1,152.00 1,152.00 0 61.41%
C1360 2,380.00 2,380.00 2,086.00 2,086.00 0 87.65%
C1370 295.00 295.00 - - 0 0.00%
C1375 308.00 308.00 - - 0 0.00%
C1377 589.00 589.00 353.00 353.00 -1 59.93%
C1380 1,264.00 1,264.00 - - 0 0.00%
C1400 148.00 148.00 148.00 148.00 0 100.00%
C1401 595.00 595.00 583.00 583.00 0 97.98%
C1410 919.80 919.80 322.74 322.74 0 35.09%
C1420 236.00 236.00 156.00 156.00 0 66.10%
C1430 2,569.00 2,569.00 578.00 578.00 -1 22.50%
C1440 766.00 766.00 750.00 750.00 0 97.91%
C1450 58.00 58.00 - - 0 0.00%
C1460 172.00 172.00 172.00 172.00 0 100.00%
C1480 24.00 24.00 - - 0 0.00%
C1500 230.00 230.00 - - 0 * 0.00%
C1510 1,044.49 1,044.49 485.52 485.52 0 46.48%
C1520 42.00 42.00 - - 0 0.00%
C1521 640.00 640.00 - - 0 0.00%
C1530 3,123.00 3,123.00 - - 0 0.00%
C1550 96.00 96.00 35.00 35.00 0 36.46%
C1600 34.00 34.00 - - 0 0.00%
C1610 200.00 200.00 90.00 90.00 0 45.00%
C1620 62.00 62.00 - - 0 0.00%
C1630 180.00 180.00 - - 0 0.00%
C2000 1,131.08 1,365.08 864.14 1,052.14 0 76.40%
C2200 1,674.85 1,674.85 1,497.41 1,497.41 0 89.41%
C2210 1,534.68 1,534.68 277.16 277.16 0 18.06%
C2300 290.00 290.00 290.00 290.00 0 100.00%
C2301 200.00 200.00 200.00 200.00 0 100.00%
C2310 213.00 213.00 213.00 213.00 -1 100.00%
C2320 1,236.00 1,236.00 885.00 885.00 0 71.60%
C2330 1,523.00 1,523.00 1,467.00 1,467.00 0 96.32%
C2340 145.00 145.00 101.00 101.00 0 69.66%
C2350 81.00 81.00 - - 0 0.00%
C2360 343.00 343.00 - - 0 0.00%
C2400 17.00 17.00 17.00 17.00 0 100.00%
C2401 47.00 47.00 47.00 47.00 0 100.00%
C2410 548.00 548.00 548.00 548.00 -1 100.00%
C2420 1,409.00 1,409.00 519.00 519.00 0 36.83%
C2430 137.00 137.00 - - 0 0.00%
C2440 539.00 539.00 - - 0 0.00%
C2500 82.00 82.00 82.00 82.00 0 100.00%
C2501 212.00 212.00 212.00 212.00 0 100.00%
C2510 1,408.00 1,408.00 1,383.00 1,383.00 0 98.22%
C2520 15.00 15.00 - - 0 0.00%
C2530 108.00 108.00 - - 0 0.00%
C2540 30.00 30.00 - - 0 0.00%
C2550 16.00 16.00 - - 0 * YA SUPERO E 0.00%
C2560 29.00 29.00 29.00 29.00 2 100.00%
C2600 23.00 23.00 7.00 7.00 0 30.43%
C2601 32.00 32.00 32.00 32.00 -1 100.00%
C2610 326.00 326.00 48.00 48.00 0 14.72%
C2620 35.00 35.00 - - 0 0.00%
C2630 876.00 876.00 341.00 341.00 0 38.93%
C2640 50.00 50.00 - - 0 0.00%
C2650 97.00 97.00 - - 0 0.00%
C2660 480.00 480.00 - - 0 * YA SUPERO E 0.00%
C2700 56.00 56.00 56.00 56.00 1 100.00%
C2710 44.00 44.00 - - 0 0.00%
C2720 363.00 363.00 56.00 56.00 0 15.43%
C2730 620.00 620.00 315.00 315.00 0 50.81%
C2740 109.00 109.00 - - 0 0.00%
C3000 1,957.88 1,957.88 1,675.70 1,675.70 0 85.59%
C3010 61.34 61.34 - - 0 0.00%
C3200 2,856.34 2,856.34 2,553.74 2,553.74 0 89.41%
C3210 2,617.30 2,617.30 472.68 472.68 0 18.06%
C3300 83.00 83.00 83.00 83.00 0 100.00%
C3310 560.00 560.00 560.00 560.00 0 100.00%
C3311 34.00 34.00 34.00 34.00 0 100.00%
C3320 10.00 10.00 - - 0 0.00%
C3330 68.00 68.00 - - 0 0.00%
C3350 16.00 16.00 - - 0 0.00%
C3360 13.00 13.00 13.00 13.00 0 100.00%
C3400 471.00 471.00 - - 0 0.00%
C3410 3,016.00 3,016.00 960.00 960.00 0 31.83%
C3420 3,071.00 3,071.00 472.00 472.00 0 15.37%
C3430 746.00 746.00 126.00 126.00 0 16.89%
C3440 774.00 774.00 245.00 245.00 0 31.65%
C3450 56.00 56.00 - - 0 0.00%
C3460 272.00 272.00 - - 0 0.00%
C3470 52.00 52.00 - - 0 0.00%
C3480 225.00 225.00 7.00 7.00 0 3.11%
C4000 1,137.48 1,137.48 963.69 963.69 0 84.72%
C4200 1,667.63 1,667.63 922.05 922.05 0 55.29%
C4300 256.00 256.00 256.00 256.00 -1 100.00%
C4310 691.27 691.27 242.55 242.55 0 35.09%
C4320 312.57 312.57 276.02 276.02 0 88.31%
C4330 1,270.00 1,270.00 1,270.00 1,270.00 -1 100.00%
C4340 1,920.00 1,920.00 1,059.00 1,059.00 0 55.16%
C4350 186.00 186.00 - - 0 0.00%
C4360 137.00 137.00 103.00 103.00 0 75.18%
C4370 111.00 111.00 49.00 49.00 0 44.14%
C4380 629.00 629.00 - - 0 0.00%
C4400 691.27 691.27 242.55 242.55 0 35.09%
C4410 238.57 238.57 202.02 202.02 0 84.68%
C4420 35.00 35.00 35.00 35.00 -1 100.00%
C4430 83.00 83.00 16.00 16.00 0 19.28%
C4500 66.00 66.00 44.00 44.00 0 66.67%
C4510 147.00 147.00 27.00 27.00 0 18.37%
C4600 161.00 161.00 161.00 161.00 0 100.00%
C4610 265.00 265.00 265.00 265.00 0 100.00%
C4611 16.00 16.00 16.00 16.00 0 100.00%
C4620 691.27 691.27 242.55 242.55 0 35.09%
C4630 238.57 238.57 202.02 202.02 0 84.68%
C4640 46.00 46.00 - - 0 0.00%
C4650 241.00 241.00 - - 0 0.00%
C4660 1.00 1.00 - - 0 0.00%
C4670 119.00 119.00 45.00 45.00 0 37.82%
C4680 293.00 293.00 - - 0 0.00%
C4700 7.00 7.00 7.00 7.00 -1 100.00%
C4710 37.00 37.00 26.00 26.00 0 70.27%
C4720 249.00 249.00 - - 0 0.00%
C4730 108.00 108.00 - - 0 0.00%
C5000 114.00 114.00 109.00 109.00 0 95.61%
C5020 48.00 48.00 47.00 47.00 0 97.92%
C5200 105.00 99.00 99.00 93.00 -1 94.29%
C5210 672.12 672.12 312.43 312.43 0 46.48%
C5220 41.00 21.00 41.00 21.00 -1 100.00%
C5230 422.00 422.00 7.00 7.00 0 1.66%
C5240 398.00 398.00 - - 0 0.00%
C5250 376.00 376.00 89.00 89.00 0 23.67%
C5260 32.00 32.00 - - 0 0.00%
C5270 300.00 300.00 - - 0 0.00%
C5300 586.67 874.67 586.67 874.67 0 100.00%
C5310 380.00 380.00 371.00 371.00 0 * YA SUPERO 97.63%
C5320 182.67 509.33 182.67 509.33 1 100.00%
C5330 58.00 58.00 58.00 58.00 0 100.00%
C5340 672.00 672.00 - - 0 0.00%
C5350 293.33 437.33 293.33 437.33 0 100.00%
C5360 86.00 86.00 86.00 86.00 0 100.00%
C5370 91.33 254.67 91.33 254.67 0 100.00%
C5380 13.00 13.00 - - 0 0.00%
C5390 221.00 221.00 - - 0 0.00%
C5400 707.00 1,713.00 591.00 1,418.00 0 83.59%
C5410 2,621.00 2,621.00 1,247.00 1,247.00 0 47.58%
C5420 932.00 932.00 319.00 319.00 0 34.23%
C5430 1,059.00 2,033.00 848.00 1,653.00 0 80.08%
C5520 1,541.00 1,541.00 1,137.00 1,137.00 0 73.78%
C5600 218.00 218.00 116.00 116.00 0 53.21%
C5610 208.00 208.00 136.00 136.00 0 65.38%
C5620 1,299.00 1,299.00 - - 0 0.00%
C5630 841.00 841.00 - - 0 0.00%
C5700 478.00 465.00 478.00 465.00 -2 100.00%
C5710 571.77 571.77 273.38 273.38 0 47.81%
C5720 83.00 439.00 83.00 439.00 -1 100.00%
C5730 1,891.00 1,820.00 71.00 14.00 0 3.75%
C5740 42.00 42.00 - - 0 0.00%
C5750 234.00 234.00 - - 0 0.00%
C5760 1,908.00 1,908.00 1,748.00 1,748.00 0 91.61%
C5770 167.00 167.00 - - 0 0.00%
C5780 254.00 254.00 - - 0 0.00%
C5790 736.00 736.00 - - 0 0.00%
C5800 133.00 133.00 - - 0 0.00%
C5810 93.00 93.00 - - 0 0.00%
C5820 123.00 123.00 2.00 2.00 0 1.63%
C5830 304.00 304.00 - - 0 0.00%
C5900 76.00 76.00 64.00 64.00 0 84.21%
C5910 3,366.00 3,366.00 - - 0 0.00%
C5920 485.00 485.00 234.00 234.00 0 48.25%
C5930 90.00 90.00 73.00 73.00 0 81.11%
C5940 56.00 56.00 35.00 35.00 0 62.50%
C5950 175.00 175.00 8.00 8.00 0 4.57%
C5960 82.00 82.00 - - 0 0.00%
C6200 67.00 67.00 46.47 46.47 0 69.35%
C6210 94.00 94.00 22.19 22.19 0 23.61%
C6220 2,457.50 2,457.50 582.08 582.08 0 23.69%
C6230 637.00 637.00 - - 0 0.00%
C6240 233.00 233.00 - - 0 0.00%
C6250 2,933.00 2,933.00 - - 0 0.00%
C6260 209.00 209.00 - - 0 0.00%
C6270 1,955.00 1,955.00 998.00 998.00 0 51.05%
C6300 67.00 67.00 46.47 46.47 0 69.35%
C6310 94.00 94.00 22.19 22.19 0 23.61%
C6320 2,457.50 2,457.50 582.08 582.08 0 23.69%
C7000 770.00 770.00 - - 0 0.00%
C8000 770.00 770.00 - - 0 0.00%
C9500 33.00 33.00 33.00 33.00 1 100.00%
C9510 425.00 425.00 425.00 425.00 -1 100.00%
C9520 353.00 353.00 353.00 353.00 0 100.00%
C9530 193.00 193.00 193.00 193.00 0 100.00%
C9540 96.00 96.00 - - 0 0.00%
C9550 103.00 103.00 27.00 27.00 0 26.21%
C9560 18.00 18.00 16.00 16.00 0 88.89%
C9570 313.00 313.00 44.00 44.00 0 14.06%
C9580 152.00 152.00 - - 0 0.00%
SDC01 3,184.00 3,184.00 - - #N/A 0.00%
SDC06 - 5,056.00 - 4,476.00 #N/A #DIV/0!
SDC08 - 9,030.00 - 3,137.00 #N/A #DIV/0!
SDC10 - 3,644.00 - 3,644.00 #N/A #DIV/0!
SDC19 - 600.00 - 600.00 #N/A #DIV/0!
T1090 1,400.00 1,400.00 1,400.00 1,400.00 1400 100.00%
T1100 1,800.00 1,800.00 1,800.00 1,800.00 1800 100.00%
T1110 450.00 450.00 450.00 450.00 450 100.00%
T1130 450.00 450.00 450.00 450.00 100.00%
Total Result 117,174.00 138,886.00 51,945.73 66,804.73 48.10%
#DIV/0!
#DIV/0!
BAC LB0 109,890 EV HH LB0 47,846 EV % LB0
BAC LC4 138,886 EV HH LC4 66,805 EV % LC4
51547
15,258
HH 24,504 11,257
EV % LC4 SECTOR 1 BAC HH EV HH
#VALUE! #N/A C1000 1,496 1,303
87.12% 1303 C1200 1,900 1,698
89.41% 1698 C1210 1,741 314
18.06% 314 C1300 25 25
100.00% 25 C1310 457 457
100.00% 457 C1320 889 425
47.81% 425 C1330 123 123
100.00% 123 C1340 22 0
0.00% 0 C1350 1,876 1,152
61.41% 1152 C1360 2,380 2,086
87.65% 2086 C1370 295 0
0.00% 0 C1375 308 0
0.00% 0 C1377 589 353
59.93% 354 C1380 1,264 0
0.00% 0 C1500 230 0
100.00% 148 C1510 1,044 486
97.98% 583 C1520 42 0
35.09% 323 C1521 640 0
66.10% 156 C1530 3,123 0
22.50% 579 C1550 96 35
97.91% 750 C1600 34 0
0.00% 0 C1610 200 90
100.00% 172 C1620 62 0
0.00% 0 C1630 180 0
0.00% 0 C1400 148 148
46.48% 486 C1401 595 583
0.00% 0 C1410 920 323
0.00% 0 C1420 236 156
0.00% 0 C1430 2,569 578
36.46% 35 C1440 766 750
0.00% 0 C1450 58 0
45.00% 90 C1460 172 172
0.00% 0 C1480 24 0
0.00% 0
77.08% 864
89.41% 1497
18.06% 277
100.00% 290
100.00% 200
100.00% 214
71.60% 885
96.32% 1467
69.66% 101
0.00% 0
0.00% 0
100.00% 17
100.00% 47
100.00% 549
36.83% 519
0.00% 0
0.00% 0
100.00% 82
100.00% 212
98.22% 1383
0.00% 0
0.00% 0
0.00% 0
0.00% 0
100.00% 27
30.43% 7
100.00% 33
14.72% 48
0.00% 0
38.93% 341
0.00% 0
0.00% 0
0.00% 0
100.00% 55
0.00% 0
15.43% 56
50.81% 315
0.00% 0
85.59% 1676
0.00% 0
89.41% 2554
18.06% 473
100.00% 83
100.00% 560
100.00% 34
0.00% 0
0.00% 0
0.00% 0
100.00% 13
0.00% 0
31.83% 960
15.37% 472
16.89% 126
31.65% 245
0.00% 0
0.00% 0
0.00% 0
3.11% 7
84.72% 964
55.29% 922
100.00% 257
35.09% 243
88.31% 276
100.00% 1271
55.16% 1059
0.00% 0
75.18% 103
44.14% 49
0.00% 0
35.09% 243
84.68% 202
100.00% 36
19.28% 16
66.67% 44
18.37% 27
100.00% 161
100.00% 265
100.00% 16
35.09% 243
84.68% 202
0.00% 0
0.00% 0
0.00% 0
37.82% 45
0.00% 0
100.00% 8
70.27% 26
0.00% 0
0.00% 0
95.61% 109
97.92% 47
93.94% 100
46.48% 312
100.00% 42
1.66% 7
0.00% 0
23.67% 89
0.00% 0
0.00% 0
100.00% 587
97.63% 371
100.00% 182
100.00% 58
0.00% 0
100.00% 293
100.00% 86
100.00% 91
0.00% 0
0.00% 0
82.78% 591
47.58% 1247
34.23% 319
81.31% 848
73.78% 1137
53.21% 116
65.38% 136
0.00% 0
0.00% 0
100.00% 480
47.81% 273
100.00% 84
0.77% 71
0.00% 0
0.00% 0
91.61% 1748
0.00% 0
0.00% 0
0.00% 0
0.00% 0
0.00% 0
1.63% 2
0.00% 0
84.21% 64
0.00% 0
48.25% 234
81.11% 73
62.50% 35
4.57% 8
0.00% 0
69.35% 46
23.61% 22
23.69% 582
0.00% 0
0.00% 0
0.00% 0
0.00% 0
51.05% 998
69.35% 46
23.61% 22
23.69% 582
0.00% 0
0.00% 0
100.00% 32
100.00% 426
100.00% 353
100.00% 193
0.00% 0
26.21% 27
88.89% 16
14.06% 44
0.00% 0
0.00% #N/A
88.53% #N/A
34.74% #N/A
100.00% #N/A
100.00% #N/A
100.00% 0
100.00% 0
100.00% 0
#REF!
#REF!
#REF!
#REF!
43.54%
48.10%
13,247 HH 13,532 6,287 7,245 HH 26,206 11,991
REMAINING SECTOR 2 BAC HH EV HH REMAINING SECTOR 3 BAC HH EV HH
193 C2000 1,365 1,052 313 C3000 1,958 1,676
202 C2200 1,675 1,497 178 C3010 61 0
1,427 C2210 1,535 277 1,258 C3200 2,856 2,554
0 C5200 99 93 6 C3210 2,617 473
0 C5210 672 312 360 C4300 256 256
464 C5220 21 21 0 C4310 691 243
0 C5230 422 7 415 C4320 313 276
22 C5240 398 0 398 C4330 1,270 1,270
724 C5250 376 89 287 C4340 1,920 1,059
294 C5260 32 0 32 C4350 186 0
295 C5270 300 0 300 C4360 137 103
308 C5700 465 465 0 C4370 111 49
236 C5710 572 273 299 C4380 629 0
1,264 C5720 439 439 0 C4400 691 243
230 C5730 1,820 14 1,806 C4410 239 202
558 C5740 42 0 42 C4420 35 35
42 C5750 234 0 234 C4430 83 16
640 C5760 1,908 1,748 160 C4500 66 44
3,123 C5770 167 0 167 C4510 147 27
61 C5780 254 0 254 C4600 161 161
34 C5790 736 0 736 C4610 265 265
110 C4611 16 16
62 C4620 691 243
180 C4630 239 202
0 C4640 46 0
12 C4650 241 0
597 C4660 1 0
80 C4670 119 45
1,991 C4680 293 0
16 C4700 7 7
58 C4710 37 26
0 C4720 249 0
24 C4730 108 0
C3400 471 0
C3410 3,016 960
C3420 3,071 472
C3430 746 126
C3440 774 245
C3450 56 0
C3460 272 0
C3470 52 0
C3480 225 7
C3300 83 83
C3310 560 560
C3311 34 34
C3320 10 0
C3330 68 0
C3350 16 0
C3360 13 13
14,215 HH 14,544 8,734 5,810 HH 31,262 11,487
REMAINING SECTOR 4 BAC HH EV HH REMAINING SECTOR 5 BAC HH EV HH
282 C4000 1,137 964 173 C6230 637 0
61 C4200 1,668 922 746 C6240 233 0
302 C2500 82 82 0 C6250 2,933 0
2,144 C2501 212 212 0 C6260 209 0
0 C2510 1,408 1,383 25 C6270 1,955 998
448 C2520 15 0 15 C6200 67 46
37 C2530 108 0 108 C6210 94 22
0 C2540 30 0 30 C6220 2,458 582
861 C2550 16 0 16 C6300 67 46
186 C2560 29 29 0 C6310 94 22
34 C2300 290 290 0 C6320 2,458 582
62 C2301 200 200 0 C5000 114 109
629 C2310 213 213 0 C5020 48 47
448 C2320 1,236 885 351 C5300 875 875
37 C2330 1,523 1,467 56 C5310 380 371
0 C2340 145 101 44 C5320 509 509
67 C2350 81 0 81 C5330 58 58
22 C2360 343 0 343 C5340 672 0
120 C2400 17 17 0 C5350 437 437
0 C2401 47 47 0 C5360 86 86
0 C2410 548 548 0 C5370 255 255
0 C2420 1,409 519 890 C5380 13 0
448 C2430 137 0 137 C5390 221 0
37 C2440 539 0 539 C5400 1,713 1,418
46 C2600 23 7 16 C5410 2,621 1,247
241 C2601 32 32 0 C5420 932 319
1 C2610 326 48 278 C5430 2,033 1,653
74 C2620 35 0 35 C5520 1,541 1,137
293 C2630 876 341 535 C5600 218 116
0 C2640 50 0 50 C5610 208 136
11 C2650 97 0 97 C5620 1,299 0
249 C2660 480 0 480 C5630 841 0
108 C2700 56 56 0 C5800 133 0
471 C2710 44 0 44 C5810 93 0
2,056 C2720 363 56 307 C5820 123 2
2,599 C2730 620 315 305 C5830 304 0
620 C2740 109 0 109 C5900 76 64
529 C5910 3,366 0
56 C5920 485 234
272 C5930 90 73
52 C5940 56 35
218 C5950 175 8
0 C5960 82 0
0
0
10
68
16
0
19,775
REMAINING
637
233
2,933
209
957
21
72
1,876
21
72
1,876
5
1
0
9
0
0
672
0
0
0
13
221
295
1,374
613
380
404
102
72
1,299
841
133
93
121
304
12
3,366
251
17
21
167
82
SEM ANTERIOR
1 2 3 4 5 6
Columna1 Activity ID Activity Name Original Duration Start Finish
CONSTRUCCIÓ
CONSTRUCCIÓN DE ALMACÉN DE 349 ### 2/18/2022
HITOS HITOS 346 ### 2/17/2022
Principales Principales 346 ### 2/17/2022
H0100 H0100 Carta de Adjudicac 0 ###
H1000 H1000 Hito de Inicio (KO 0 ###
H1010 H1010 Fin del proyecto 0 2/17/2022
Intermedios Intermedios 345 ### 2/17/2022
H1020 H1020 Aprobación del M 0 ###
H1025 H1025 Aprobación de Do 0 ###
H1030 H1030 Entrega de Terren 0 ###
H1040 H1040 Inicio de Obra 0 ###
H2000 H2000 Inicio de Construc 0 ###
H2010 H2010 Fin de Construcció 0 2/5/2022
H2020 H2020 Fin de Obra 0 2/17/2022
INGENIERÍA INGENIERÍA 0 ### ###
E1000 E1000 Entrega de Ingenier 0 ###
E2000 E2000 Entrega de Ingenier 0 ###
E3000 E3000 Entrega de Ingenie 0 ###
E4000 E4000 Entrega de Ingenier 0 ###
E5000 E5000 Entrega de Ingenie 0 ###
PROCURA PROCURA 63 12/17/2021 2/18/2022
Módulo A - A Módulo A - Almacén de Comp 15 12/17/2021 1/1/2022
P1020 P1020 [Eléctrica] - 02 V 0 12/17/2021
P1021 P1021 [Eléctrica] - 02 V 0 12/17/2021
P1022 P1022 [Eléctrica] - TR 0 12/17/2021
P1023 P1023 [Eléctrica] - TR 0 12/17/2021
P1024 P1024 [Eléctrica] - DES 0 12/17/2021
P1025 P1025 [Eléctrica] - DES 0 12/17/2021
P1030 P1030 [Mecánico] - 06 E 0 12/17/2021
P1031 P1031 [Mecánico] - 06 E 0 1/1/2022
Módulo C - A Módulo C - Almacén Tempor 0 12/17/2021 12/17/2021
P2010 P2010 [Eléctrica] - AUT 0 12/17/2021
P2011 P2011 [Eléctrica] - AUT 0 12/17/2021
Módulo D - A Módulo D - Almacén Tempora 0 12/17/2021 12/17/2021
P3020 P3020 [Eléctrica] - TRI 0 12/17/2021
P3021 P3021 [Eléctrica] - TRI 0 12/17/2021
P3030 P3030 [Eléctrica] - COM 0 12/17/2021
P3031 P3031 [Eléctrica] - COM 0 12/17/2021
P3040 P3040 [Eléctrica] - ENF 0 12/17/2021
P3041 P3041 [Eléctrica] - ENF 0 12/17/2021
P3050 P3050 [Mecánico] - 02 E 0 12/17/2021
P3051 P3051 [Mecánico] - 02 E 0 12/17/2021
P3060 P3060 [Mecánico] - 01 0 12/17/2021
P3061 P3061 [Mecánico] - 01 0 12/17/2021
P3070 P3070 [Eléctrica] - TR 0 12/17/2021
P3071 P3071 [Eléctrica] - TR 0 12/17/2021
P3080 P3080 [Eléctrica] - LAV 0 12/17/2021
P3081 P3081 [Eléctrica] - LAV 0 12/17/2021
P3090 P3090 [Eléctrica] - SEC 0 12/17/2021
P3091 P3091 [Eléctrica] - SEC 0 12/17/2021
Módulo E - R Módulo E - Rampa de Descar 0 12/17/2021 12/17/2021
P4010 P4010 [Eléctrica] - AR 0 12/17/2021
P4011 P4011 [Eléctrica] - AR 0 12/17/2021
P4020 P4020 [Eléctrica] - AR 0 12/17/2021
P4021 P4021 [Eléctrica] - AR 0 12/17/2021
P4030 P4030 [Eléctrica] - IN 0 12/17/2021
P4031 P4031 [Eléctrica] - IN 0 12/17/2021
P4040 P4040 [Eléctrica] - TO 0 12/17/2021
P4041 P4041 [Eléctrica] - TO 0 12/17/2021
Módulo F - A Módulo F - Almacén Temporal 11 12/17/2021 12/28/2021
P5010 P5010 [Eléctrica] - EN 0 12/17/2021
P5011 P5011 [Eléctrica] - EN 0 12/28/2021
P5020 P5020 [Eléctrica] - TRI 0 12/17/2021
P5021 P5021 [Eléctrica] - TRI 0 12/28/2021
Módulo H - A Módulo H - Almacén de Herr 2 12/17/2021 12/19/2021
P6010 P6010 [Eléctrica] - COM 0 12/17/2021
P6011 P6011 [Eléctrica] - COM 0 12/19/2021
Módulo K: Sis Módulo K: Sistema de Colecc 10 12/17/2021 12/27/2021
P6030 P6030 [Mecánico] - 01 0 12/17/2021
P6031 P6031 [Mecánico] - 01 0 12/27/2021
P6040 P6040 [Mecánico] - DES 0 12/17/2021
P6041 P6041 [Mecánico] - DES 0 12/27/2021
P6060 P6060 [Mecánico] - 01 0 12/17/2021
P6061 P6061 [Mecánico] - 01 0 12/27/2021
Módulo L: Ra Módulo L: Rampa del Sistema 19 12/17/2021 1/5/2022
P7010 P7010 [Eléctrica] - SI 0 12/17/2021
P7011 P7011 [Eléctrica] - SI 0 1/5/2022
Módulo O Y P: Módulo O Y P: Taller Mecánic 15 12/17/2021 1/1/2022
P7020 P7020 [Eléctrica] - CA 0 12/17/2021
P7021 P7021 [Eléctrica] - CA 0 1/1/2022
P7030 P7030 [Eléctrica] - DES 0 12/17/2021
P7031 P7031 [Eléctrica] - DES 0 1/1/2022
P7040 P7040 [Eléctrica] - COM 0 12/17/2021
P7041 P7041 [Eléctrica] - COM 0 1/1/2022
Módulo R: Ser Módulo R: Servicios Higiénico 7 12/17/2021 12/24/2021
P7500 P7500 [Eléctrica] - 01 0 12/17/2021
P7510 P7510 [Eléctrica] - 01 0 12/24/2021
Módulo S: Cis Módulo S: Cisterna 17 12/17/2021 1/3/2022
P8000 P8000 [Mecánico] - 02 0 12/17/2021
P8001 P8001 [Mecánico] - 02 0 12/17/2021
P8010 P8010 [Mecánico] - 02 0 12/17/2021
P8011 P8011 [Mecánico] - 02 0 12/17/2021
P8020 P8020 [Instrumentación 0 12/17/2021
P8021 P8021 [Instrumentación 0 1/3/2022
Subestación Subestación de 600KVA, 23/ 9 12/17/2021 12/26/2021
P9010 P9010 [Eléctrica] - PAR 0 12/17/2021
P9011 P9011 [Eléctrica] - PAR 0 12/26/2021
P9020 P9020 [Eléctrica] - TR 0 12/17/2021
P9021 P9021 [Eléctrica] - TR 0 12/26/2021
P9030 P9030 [Eléctrica] - SUB 0 12/17/2021
P9031 P9031 [Eléctrica] - SUB 0 12/26/2021
P9040 P9040 [Instrumentación] 0 12/17/2021
P9041 P9041 [Instrumentación] 0 12/26/2021
Instrumentaci Instrumentación y Control 63 12/17/2021 2/18/2022
P9100 P9100 [Instrumentación] 0 12/17/2021
P9110 P9110 [Instrumentación] 0 12/18/2021
P9120 P9120 [Instrumentación] 0 12/17/2021
P9130 P9130 [Instrumentación] 0 2/18/2022
P9140 P9140 [Instrumentación 0 12/17/2021
P9150 P9150 [Instrumentación 0 2/18/2022
P9160 P9160 [Instrumentación] 0 12/17/2021
P9170 P9170 [Instrumentación] 0 2/18/2022
P9180 P9180 [Instrumentación 0 12/17/2021
P9190 P9190 [Instrumentación 0 12/31/2021
PRELIMINARE PRELIMINARES Y PROVISIONAL 52 ### 14-06-21 17:
RECLUTAMIE RECLUTAMIENTO 52 ### 10-06-21 17:
T1000 T1000 Reclutamiento de p 52 ### 29-04-21 17:
T1010 T1010 Selección y reclut 45 ### 26-04-21 17:
T1020 T1020 Presentación de d 33 ### 26-04-21 17:
T1030 T1030 Presentación y rev 4 ### 16-03-21 17:
T1040 T1040 Selección y reclu 45 ### 10-06-21 17:
ELABORACIÓN ELABORACIÓN DE PLANES 37 ### 24-04-21 17:
T1050 T1050 Elaboración de Pla 37 ### 24-04-21 17:
MOVILIZACIÓ MOVILIZACIÓN 40 ### 14-06-21 17:
T1060 T1060 Cuarentena de Pri 2 ### 30-04-21 17:
T1070 T1070 Capacitaciones e i 5 ### 05-05-21 17:
T1080 T1080 Movilización de P 40 ### 14-06-21 17:
OBRAS PROVI OBRAS PROVISIONALES 17 ### 22-05-21 17:
T1090 T1090 Instalación de Case 15 ### 22-05-21 17:
T1100 T1100 Instalación de ener 15 ### 22-05-21 17:
OBRAS PRELI OBRAS PRELIMINARES 12 ### 18-05-21 17:
T1110 T1110 Trazo y replanteo i 2 ### 11-05-21 17:
T1120 T1120 Revisión y validac 5 ### 16-05-21 17:
T1130 T1130 Señalización de la 5 ### 18-05-21 17:
CONSTRUCCI CONSTRUCCIÓN 324 ### 2/17/2022
SECTOR 1 SECTOR 1 307 ### 2/5/2022
Movimiento d Movimiento de Tierras 10 ### 12/18/2021
C1000 C1000 [M. Tierras] - Exca 10 ### 12/18/2021
Sistema de Re Sistema de Red de Agua Pot 36 ### 12/31/2021
C1200 C1200 [M. Tierras] - Exca 15 ### 12/19/2021
C1210 C1210 [Sanitaria] - Coloc 30 ### 12/31/2021
08. Módulo 08. Módulo D: ALMACÉN 84 ### 1/5/2022
C1300 C1300 [Concreto] - Vacia 1 ### 20-06-21 17:
C1310 C1310 [Concreto] - Armad 12 ### 12-09-21 17:
C1320 C1320 [Eléctrica] - Traba 7 ### 12/20/2021
C1330 C1330 [M. Tierras] - Rell 5 ### ###
C1340 C1340 [Concreto] - Solad 1 ### 12/17/2021
C1350 C1350 [Concreto] - Armad 24 ### 12/28/2021
C1360 C1360 [Estructuras] - Mo 25 ### 12/18/2021
C1370 C1370 [Eléctrica] - Mont 5 12/22/2021 12/26/2021
C1375 C1375 [Sanitaria] - Coloc 7 12/27/2021 1/2/2022
C1377 C1377 [Estructuras] - Pin 5 ### 12/18/2021
C1380 C1380 [Eléctrica] - Mont 18 12/19/2021 1/5/2022
06. Módulo B 06. Módulo B: LOSA DE VO 86 ### 2/5/2022
C1500 C1500 [M. Tierras] - Exc 5 1/3/2022 1/7/2022
C1510 C1510 [Eléctrica] - Traba 8 ### 12/20/2021
C1520 C1520 [M. Tierras] - Rell 7 12/21/2021 12/27/2021
C1521 C1521 [Geotextil] - Colo 12 12/28/2021 1/8/2022
C1530 C1530 [Concreto] - Armad 21 1/14/2022 2/3/2022
C1550 C1550 [Estructuras] - Mo 2 ### 2/5/2022
07. Módulo 07. Módulo C: ALMACÉN 28 ### 1/16/2022
C1600 C1600 [Concreto] - Armad 2 1/15/2022 1/16/2022
C1610 C1610 [Estructuras] - Mo 5 ### 12/19/2021
C1620 C1620 [Eléctrica] - Mont 1 12/22/2021 12/22/2021
C1630 C1630 [Eléctrica] - Mont 6 12/23/2021 12/28/2021
SECTOR 2 SECTOR 2 99 ### 1/20/2022
Movimiento d Movimiento de Tierras 10 ### ###
C2000 C2000 [M. Tierras] - Exca 10 ### 12/18/2021
Sistema de Re Sistema de Red de Agua Pot 37 ### 1/1/2022
C2200 C2200 [M. Tierras] - Exca 10 ### 12/18/2021
C2210 C2210 [Concreto] - Acero 25 ### 1/1/2022
23.2 Subestac 23.2 Subestación de 600K 50 ### 1/17/2022
C5200 C5200 [Concreto] - Armad 15 10/7/2021 12/23/2021
C5210 C5210 [Eléctrica] - Traba 8 ### 12/20/2021
C5220 C5220 [M. Tierras] - Rell 5 10/6/2021 07-10-21 17:
C5230 C5230 [Concreto] - Arma 7 ### 12/23/2021
C5240 C5240 [Eléctrica] - Mont 10 ### 1/9/2022
C5250 C5250 [Estructuras] - Mo 10 ### 12/23/2021
C5260 C5260 [Sanitaria] - Coloc 8 ### 12/31/2021
C5270 C5270 [Eléctrica] - Mont 25 ### 1/17/2022
05. Módulo 05. Módulo A: ALMACÉN 99 ### 1/20/2022
C5700 C5700 [Concreto] - Armad 20 ### 18-11-21 17:
C5710 C5710 [Eléctrica] - Traba 7 ### 12/20/2021
C5720 C5720 [M. Tierras] - Rell 4 ### 11-11-21 17:
C5730 C5730 [Concreto] - Arma 20 ### ###
C5740 C5740 [Mecánica] - Monta 5 ### 1/10/2022
C5750 C5750 [Eléctrica] - Mont 5 12/22/2021 12/26/2021
C5760 C5760 [Estructuras] - Mo 35 ### 12/19/2021
C5770 C5770 [Carpintería] - Col 10 12/20/2021 12/29/2021
C5780 C5780 [Sanitaria] - Coloc 14 12/20/2021 1/2/2022
C5790 C5790 [Eléctrica] - Mont 15 ### 1/20/2022
SECTOR 3 SECTOR 3 105 ### 2/3/2022
SECTOR 3.1 SECTOR 3.1 98 ### 1/27/2022
Movimiento d Movimiento de Tierras 73 ### 1/2/2022
C3000 C3000 [M. Tierras] - Exca 12 ### 12/18/2021
C3010 C3010 [Eléctrica] - Traba 15 12/19/2021 1/2/2022
Sistema de Re Sistema de Red de Agua Po 46 9/1/2021 1/4/2022
C3200 C3200 [M. Tierras] - Exca 20 ### 12/19/2021
C3210 C3210 [Concreto] - Acero 25 9/1/2021 1/4/2022
19. Módulo O 19. Módulo O Y P: TAL 68 6/14/2021 1/27/2022
C4300 C4300 [Concreto] - Armad 10 6/16/2021 02-09-21 17:
C4310 C4310 [Eléctrica] - Traba 7 ### 12/19/2021
C4320 C4320 [M. Tierras] - Rell 4 ### 12/17/2021
C4330 C4330 [Concreto] - Armad 16 ### 09-12-21 18:
C4340 C4340 [Estructuras] - Mo 34 ### 1/5/2022
C4350 C4350 [Eléctrica] - Mont 4 1/6/2022 1/9/2022
C4360 C4360 [Carpintería] - Col 10 ### 12/18/2021
C4370 C4370 [Sanitaria] - Coloc 10 ### 12/21/2021
C4380 C4380 [Eléctrica] - Mont 18 ### 1/27/2022
17. Módulo 17. Módulo M: ALMACÉN 66 ### 12/23/2021
C4400 C4400 [Eléctrica] - Trabaj 7 ### ###
C4410 C4410 [M. Tierras] - Relle 7 ### 12/18/2021
C4420 C4420 [Concreto] - Armad 4 ### 14-11-21 17:
C4430 C4430 [Estructuras] - Mo 7 ### 12/23/2021
18. Módulo N 18. Módulo N: ALMACÉN 27 ### 12/21/2021
C4500 C4500 [Concreto] - Armad 4 11/12/2021 12/18/2021
C4510 C4510 [Estructuras] - Mo 7 ### 12/21/2021
21. Módulo S 21. Módulo S: CISTERNA 84 ### 1/25/2022
C4600 C4600 [M. Tierras] - Exca 3 7/3/2021 28-08-21 17:
C4610 C4610 [Concreto] - Armad 15 ### 09-12-21 18:
C4611 C4611 [M. Tierras] - Rell 7 ### 02-09-21 17:
C4620 C4620 [Eléctrica] - Malla 7 ### 12/20/2021
C4630 C4630 [M. Tierras] - Rell 4 9/1/2021 12/17/2021
C4640 C4640 [Sanitaria] - Mon 5 12/22/2021 12/26/2021
C4650 C4650 [Sanitaria] - Monta 12 ### 1/7/2022
C4660 C4660 [Instrumentación] 4 1/8/2022 1/11/2022
C4670 C4670 [Estructuras] - Mon 7 ### 12/21/2021
C4680 C4680 [Eléctrica] - Mont 30 ### 1/25/2022
20. Módulo R 20. Módulo R: SERVICIOS 71 ### ###
C4700 C4700 [M. Tierras] - Exca 4 ### 02-09-21 17:
C4710 C4710 [Concreto] - Dados 6 ### ###
C4720 C4720 [Estructuras] - Mo 3 ### 12/31/2021
C4730 C4730 [Eléctrica] - Mont 12 ### 1/12/2022
SECTOR 3.2 SECTOR 3.2 95 8/20/2021 2/3/2022
16. Módulo 16. Módulo L: RAMPA D 95 9/1/2021 2/3/2022
C3400 C3400 [M. Tierras] - Exc 6 12/17/2021 12/22/2021
C3410 C3410 [Concreto] - Arma 22 ### 12/30/2021
C3420 C3420 [Concreto] - Arma 20 9/1/2021 1/2/2022
C3430 C3430 [Concreto] - Armad 10 ### 12/24/2021
C3440 C3440 [Estructuras] - Mo 10 ### ###
C3450 C3450 [Eléctrica] - Mont 10 ### 1/19/2022
C3460 C3460 [Eléctrica] - Mont 25 1/10/2022 2/3/2022
C3470 C3470 [Geotextil] - Col 5 12/23/2021 12/27/2021
C3480 C3480 [M. Tierras] - Rell 4 ### 12/20/2021
15. SISTEMA 15. SISTEMA DE COLECCI 66 ### 1/10/2022
C3300 C3300 [M. Tierras] - Exc 10 8/20/2021 07-10-21 17:
C3310 C3310 [Concreto] - Armad 20 ### 23-11-21 16:
C3311 C3311 [M. Tierras] - Rell 8 ### 07-10-21 17:
C3320 C3320 [Geotextil] - Inst 5 ### 12/21/2021
C3330 C3330 [Sanitaria] - Inst 7 ### 12/28/2021
C3350 C3350 [Sanitaria] - Insta 10 1/1/2022 1/10/2022
C3360 C3360 [Carpintería] - Col 5 11/12/2021 18-11-21 17:
SECTOR 4 SECTOR 4 83 6/4/2021 1/18/2022
Movimiento d Movimiento de Tierras 10 ### 12/18/2021
C4000 C4000 [M. Tierras] - Exca 10 ### 12/18/2021
Sistema de Re Sistema de Red de Agua Pot 30 ### ###
C4200 C4200 [Concreto] - Acero 30 ### 12/31/2021
14. Módulo K 14. Módulo K: SISTEMA D 57 ### ###
C2500 C2500 [M. Tierras] - Rell 8 9/1/2021 18-11-21 17:
C2501 C2501 [M. Tierras] - Exc 7 8/30/2021 18-11-21 17:
C2510 C2510 [Concreto] - Armad 20 7/1/2021 12/17/2021
C2520 C2520 [Geotextil] - Col 5 12/17/2021 12/21/2021
C2530 C2530 [Sanitaria] - Inst 7 ### 12/28/2021
C2540 C2540 [Mecánica] - Insta 4 ### 1/4/2022
C2550 C2550 [Sanitaria] - Insta 10 ### 1/14/2022
C2560 C2560 [Carpintería] - Ins 10 ### 18-11-21 17:
09. Módulo 09. Módulo E: RAMPA DE 61 ### 1/2/2022
C1400 C1400 [Concreto] - Solad 13 ### 02-09-21 17:
C1401 C1401 [M. Tierras] - Exca 15 ### 12/17/2021
C1410 C1410 [Eléctrica] - Traba 10 ### ###
C1420 C1420 [M. Tierras] - Rell 7 ### 12/20/2021
C1430 C1430 [Concreto] - Armad 18 7/21/2021 12/30/2021
C1440 C1440 [Estructuras] - Mo 14 9/1/2021 12/17/2021
C1450 C1450 [Sanitaria] - Coloc 4 12/18/2021 12/21/2021
C1460 C1460 [Estructuras] - Pin 7 10/13/2021 02-12-21 17:
C1480 C1480 [Eléctrica] - Mont 12 ### 1/2/2022
10. Módulo 10. Módulo F: ALMACÉN 58 ### 1/18/2022
C2300 C2300 [Concreto] - Armad 12 ### 02-09-21 17:
C2301 C2301 [M. Tierras] - Exca 4 ### 20-11-21 17:
C2310 C2310 [M. Tierras] - Rell 5 ### 11-11-21 18:
C2320 C2320 [Concreto] - Armad 15 ### 12/23/2021
C2330 C2330 [Estructuras] - Mo 20 ### 12/18/2021
C2340 C2340 [Sanitaria] - Colo 10 11/12/2021 12/19/2021
C2350 C2350 [Eléctrica] - Monta 2 1/2/2022 1/3/2022
C2360 C2360 [Eléctrica] - Mont 15 1/4/2022 1/18/2022
11. Módulo 11. Módulo G: REVEGETACI 75 ### 1/14/2022
C2400 C2400 [Concreto] - Coloc 3 11/5/2021 18-11-21 17:
C2401 C2401 [M. Tierras] - Cort 5 ### 11-11-21 17:
C2410 C2410 [Concreto] - Armad 6 ### 16-12-21 17:
C2420 C2420 [Estructuras] - Mo 20 ### 12/29/2021
C2430 C2430 [Sanitaria] - Coloc 10 12/30/2021 1/8/2022
C2440 C2440 [Eléctrica] - Mont 16 12/30/2021 1/14/2022
12. Módulo 12. Módulo H: ALMACÉN 56 ### 1/8/2022
C2600 C2600 [Concreto] - Armad 2 12/2/2021 12/18/2021
C2601 C2601 [M. Tierras] - Exca 4 11/5/2021 09-12-21 18:
C2610 C2610 [Concreto] - Armad 6 12/2/2021 12/21/2021
C2620 C2620 [Concreto] - Armad 4 12/22/2021 12/25/2021
C2630 C2630 [Estructuras] - Mo 12 ### 12/23/2021
C2640 C2640 [Eléctrica] - Mont 1 12/24/2021 12/24/2021
C2650 C2650 [Sanitaria] - Coloc 10 12/25/2021 1/3/2022
C2660 C2660 [Eléctrica] - Mont 15 12/25/2021 1/8/2022
13. Módulo 13. Módulo I: ALMACÉN 47 ### 12/28/2021
C2700 C2700 [M. Tierras] - Exca 6 11/5/2021 02-12-21 17:
C2710 C2710 [Concreto] - Arma 3 12/17/2021 12/19/2021
C2720 C2720 [Concreto] - Armad 10 ### 12/24/2021
C2730 C2730 [Estructuras] - Mo 10 11/5/2021 12/21/2021
C2740 C2740 [Sanitaria] - Monta 7 12/22/2021 12/28/2021
SECTOR 5 SECTOR 5 123 ### 2/1/2022
Canal de Dren Canal de Drenaje Superficial 100 ### 2/1/2022
C6230 C6230 [M. Tierras] - Exc 15 12/19/2021 1/2/2022
C6240 C6240 [M. Tierras] - Rell 15 12/29/2021 1/12/2022
C6250 C6250 [Concreto] - Vacia 15 1/8/2022 1/22/2022
C6260 C6260 [Sanitaria] - Monta 15 1/18/2022 2/1/2022
C6270 C6270 [Carpintería] - Ins 100 ### 1/27/2022
26.2 Cerco Pe 26.2 Cerco Perimétrico Inter 67 ### 1/20/2022
C6200 C6200 [M. Tierras] - Exc 20 12/2/2021 12/23/2021
C6210 C6210 [Concreto] - Vacia 20 12/16/2021 12/31/2021
C6220 C6220 [Estructuras] - Co 50 ### 1/20/2022
26.3 Cerco Pe 26.3 Cerco Perimétrico Exter 87 ### 1/5/2022
C6300 C6300 [M. Tierras] - Exc 30 12/2/2021 12/31/2021
C6310 C6310 [Concreto] - Vacia 30 12/16/2021 1/5/2022
C6320 C6320 [Estructuras] - Co 30 ### 1/5/2022
23. INSTALAC 23. INSTALACIONES ELECT 99 ### 1/29/2022
Banco de duc Banco de ductos 18 ### 12/17/2021
C5000 C5000 [M. Tierras] - Exc 10 ### 12/17/2021
C5020 C5020 [M. Tierras] - Rel 8 ### 12/17/2021
23.1 Acometid 23.1 Acometida desde Lín 72 ### 1/29/2022
C5300 C5300 [M. Tierras] - Exc 10 ### 19-11-21 17:
C5310 C5310 [Eléctrica] - Mont 7 ### 12/17/2021
C5320 C5320 [Eléctrica] - Rell 7 ### 19-11-21 17:
C5330 C5330 [Eléctrica] - Traba 10 11/12/2021 20-11-21 17:
C5340 C5340 [Eléctrica] - Mont 20 1/10/2022 1/29/2022
C5350 C5350 [M. Tierras] - Exc 4 ### 19-11-21 17:
C5360 C5360 [Instrumentación] 4 12/3/2021 09-12-21 18:
C5370 C5370 [Instrumentación] 5 ### 19-11-21 17:
C5380 C5380 [Instrumentación] 7 12/17/2021 12/23/2021
C5390 C5390 [Instrumentación] 15 12/24/2021 1/7/2022
23.3 Red de D 23.3 Red de Distribución 77 ### 1/10/2022
C5400 C5400 [M. Tierras] - Exc 40 ### 12/21/2021
C5410 C5410 [Eléctrica] - Colo 40 ### 1/7/2022
C5420 C5420 [Concreto] - Vacia 40 ### 1/10/2022
C5430 C5430 [M. Tierras] - Rel 40 ### 12/26/2021
23.4 Buzones 23.4 Buzones Eléctricos 20 ### 12/21/2021
C5520 C5520 [Concreto] - Traba 20 ### 12/21/2021
23.5 Iluminac 23.5 Iluminación Exterior 54 ### 1/19/2022
C5600 C5600 [M. Tierras] - Trab 15 ### 12/26/2021
C5610 C5610 [Concreto] - Traba 12 11/12/2021 12/26/2021
C5620 C5620 [Eléctrica] - Monta 14 12/19/2021 1/1/2022
C5630 C5630 [Eléctrica] - Canal 12 1/8/2022 1/19/2022
22. SEÑALIZ 22. SEÑALIZACION INTERN 37 ### 1/10/2022
C5800 C5800 [M. Tierras] - Exc 18 12/24/2021 1/10/2022
C5810 C5810 [Concreto] - Encof 18 12/24/2021 1/10/2022
C5820 C5820 [Estructuras] - Mo 18 ### 1/3/2022
C5830 C5830 [Señalización] - M 18 12/17/2021 1/3/2022
25. INSTRUME 25. INSTRUMENTACIÓN Y CO 88 ### 1/13/2022
C5900 C5900 [M. Tierras] - Exc 25 11/12/2021 12/21/2021
C5910 C5910 [Eléctrica] - Colo 25 12/17/2021 1/10/2022
C5920 C5920 [Concreto] - Vaci 25 11/12/2021 12/28/2021
C5930 C5930 [M. Tierras] - Rel 25 11/12/2021 12/22/2021
C5940 C5940 [Estructuras] - Mo 10 ### 12/20/2021
C5950 C5950 [Instrumentación] 15 ### 12/28/2021
C5960 C5960 [Instrumentación] 22 12/23/2021 1/13/2022
DESMONTAJE DESMONTAJE DE ESTRUCTUR 102 ### 2/17/2022
Desmontaje y Desmontaje y habilitación 102 ### 2/17/2022
C9500 C9500 Módulo C: Almacén 30 ### 07-10-21 17:
C9510 C9510 Módulo G: Reveget 30 9/6/2021 09-09-21 17:
C9520 C9520 Modulo H: Almacén 30 ### 17-02-22 17:
C9530 C9530 Módulo I: Almacén 30 9/3/2021 02-12-21 17:
C9540 C9540 Módulo L: Rampa d 30 1/19/2022 2/17/2022
C9550 C9550 Módulo M: Almacén 20 12/2/2021 2/17/2022
C9560 C9560 Módulo N: Almacén 20 ### 2/17/2022
C9570 C9570 Módulo O Y P: Tall 30 12/2/2021 2/17/2022
C9580 C9580 Módulo R: Containe 12 ### 12/28/2021
27. PRECOMI 27. PRECOMISIONAMIENTO 30 12/19/2021 1/17/2022
C7000 C7000 Precomisionado de 30 12/19/2021 1/17/2022
28. COMISIO 28. COMISIONAMIENTO 12 2/6/2022 2/17/2022
C8000 C8000 Comisionamiento 12 2/6/2022 2/17/2022
7 8 9 10
BL Project Duration BL Project Start BL Project Finish Variance - BL Project Finish Date
237 3/9/2021 10/31/2021 -109
237 3/9/2021 10/31/2021 -109
237 3/9/2021 10/31/2021 -109
0 3/9/2021 0
0 4/16/2021 0
0 10/31/2021 -109
207 4/8/2021 10/31/2021 -109
0 4/8/2021 0
0 5/7/2021 0
0 5/4/2021 38
0 5/5/2021 38
0 5/17/2021 0
0 10/19/2021 -109
0 10/31/2021 -109
0 3/17/2021 3/17/2021 0
0 3/17/2021 0
0 3/17/2021 0
0 3/17/2021 0
0 3/17/2021 0
0 3/17/2021 0
109 6/15/2021 10/2/2021 -139
35 7/22/2021 8/26/2021 -128
0 7/22/2021 -148
0 8/21/2021 -118
0 7/22/2021 -148
0 8/21/2021 -118
0 7/22/2021 -148
0 8/21/2021 -118
0 7/27/2021 -143
0 8/26/2021 -128
30 7/16/2021 8/15/2021 -124
0 7/16/2021 -154
0 8/15/2021 -124
30 7/28/2021 8/27/2021 -112
0 7/28/2021 -142
0 8/27/2021 -112
0 7/28/2021 -142
0 8/27/2021 -112
0 7/28/2021 -142
0 8/27/2021 -112
0 7/28/2021 -142
0 8/27/2021 -112
0 7/28/2021 -142
0 8/27/2021 -112
0 7/28/2021 -142
0 8/27/2021 -112
0 7/28/2021 -142
0 8/27/2021 -112
0 7/28/2021 -142
0 8/27/2021 -112
15 9/17/2021 10/2/2021 -76
0 9/17/2021 -91
0 10/2/2021 -76
0 9/17/2021 -91
0 10/2/2021 -76
0 9/17/2021 -91
0 10/2/2021 -76
0 9/17/2021 -91
0 10/2/2021 -76
30 8/22/2021 9/21/2021 -98
0 8/22/2021 -117
0 9/21/2021 -98
0 8/22/2021 -117
0 9/21/2021 -98
15 9/12/2021 9/27/2021 -83
0 9/12/2021 -96
0 9/27/2021 -83
30 8/1/2021 8/31/2021 -118
0 8/1/2021 -138
0 8/31/2021 -118
0 8/16/2021 -123
0 8/31/2021 -118
0 8/1/2021 -138
0 8/31/2021 -118
15 8/5/2021 8/20/2021 -138
0 8/5/2021 -134
0 8/20/2021 -138
15 9/7/2021 9/22/2021 -101
0 9/7/2021 -101
0 9/22/2021 -101
0 9/7/2021 -101
0 9/22/2021 -101
0 9/7/2021 -101
0 9/22/2021 -101
30 6/15/2021 7/15/2021 -162
0 6/15/2021 -185
0 7/15/2021 -162
37 7/11/2021 8/17/2021 -139
0 7/11/2021 -159
0 7/31/2021 -139
0 7/11/2021 -159
0 7/31/2021 -139
0 7/28/2021 -142
0 8/17/2021 -139
30 8/1/2021 8/31/2021 -117
0 8/1/2021 -138
0 8/31/2021 -117
0 8/1/2021 -138
0 8/31/2021 -117
0 8/24/2021 -115
0 8/31/2021 -117
0 8/1/2021 -138
0 8/31/2021 -117
37 8/15/2021 9/21/2021 -150
0 8/22/2021 -117
0 9/11/2021 -98
0 9/1/2021 -107
0 9/21/2021 -150
0 9/1/2021 -107
0 9/21/2021 -150
0 9/1/2021 -107
0 9/21/2021 -150
0 8/15/2021 -124
0 9/4/2021 -118
98 3/9/2021 6/14/2021 0
94 3/9/2021 6/10/2021 0
52 3/9/2021 4/29/2021 0
45 3/13/2021 4/26/2021 0
33 3/25/2021 4/26/2021 0
4 3/13/2021 3/16/2021 0
45 4/27/2021 6/10/2021 0
37 3/19/2021 4/24/2021 0
37 3/19/2021 4/24/2021 0
47 4/29/2021 6/14/2021 0
2 4/29/2021 4/30/2021 0
5 5/1/2021 5/5/2021 0
40 5/6/2021 6/14/2021 0
15 5/8/2021 5/22/2021 0
15 5/8/2021 5/22/2021 0
15 5/8/2021 5/22/2021 0
9 5/10/2021 5/18/2021 0
2 5/10/2021 5/11/2021 0
5 5/12/2021 5/16/2021 0
5 5/14/2021 5/18/2021 0
144 5/29/2021 10/19/2021 -121
113 5/29/2021 9/18/2021 -140
10 5/29/2021 6/7/2021 -194
10 5/29/2021 6/7/2021 -194
50 6/13/2021 8/1/2021 -152
15 6/13/2021 6/27/2021 -175
30 7/3/2021 8/1/2021 -152
103 6/8/2021 9/18/2021 -109
1 6/8/2021 6/8/2021 -12
12 6/9/2021 6/20/2021 -84
7 6/21/2021 6/27/2021 -176
5 6/28/2021 7/2/2021 -117
1 7/3/2021 7/3/2021 -167
24 7/4/2021 7/27/2021 -154
25 8/7/2021 8/31/2021 -109
5 9/1/2021 9/5/2021 -112
7 9/6/2021 9/12/2021 -112
5 9/13/2021 9/17/2021 -92
18 9/1/2021 9/18/2021 -109
67 6/23/2021 8/28/2021 -161
5 6/23/2021 6/27/2021 -194
8 7/5/2021 7/12/2021 -161
7 7/13/2021 7/19/2021 -161
12 7/20/2021 7/31/2021 -161
21 8/6/2021 8/26/2021 -161
2 8/27/2021 8/28/2021 -161
20 8/7/2021 8/26/2021 -143
2 8/7/2021 8/8/2021 -161
5 8/15/2021 8/19/2021 -122
1 8/20/2021 8/20/2021 -124
6 8/21/2021 8/26/2021 -124
126 6/8/2021 10/11/2021 -101
10 6/8/2021 6/17/2021 -184
10 6/8/2021 6/17/2021 -184
40 6/28/2021 8/6/2021 -148
10 6/28/2021 7/7/2021 -164
25 7/13/2021 8/6/2021 -148
79 7/25/2021 10/11/2021 -98
15 7/25/2021 8/8/2021 -137
8 8/9/2021 8/16/2021 -126
5 8/17/2021 8/21/2021 -47
7 8/22/2021 8/28/2021 -117
10 9/5/2021 9/14/2021 -117
10 9/7/2021 9/16/2021 -98
8 9/17/2021 9/24/2021 -98
25 9/17/2021 10/11/2021 -98
99 6/8/2021 9/14/2021 -128
20 6/8/2021 6/27/2021 -144
7 6/28/2021 7/4/2021 -169
4 6/28/2021 7/1/2021 -133
20 7/2/2021 7/21/2021 -168
5 8/31/2021 9/4/2021 -128
5 8/26/2021 8/30/2021 -118
35 7/22/2021 8/25/2021 -116
10 8/26/2021 9/4/2021 -116
14 8/26/2021 9/8/2021 -116
15 8/31/2021 9/14/2021 -128
123 6/18/2021 10/18/2021 -108
123 6/18/2021 10/18/2021 -101
27 6/18/2021 7/14/2021 -172
12 6/18/2021 6/29/2021 -172
15 6/30/2021 7/14/2021 -172
46 7/15/2021 8/29/2021 -128
20 7/15/2021 8/3/2021 -138
25 8/5/2021 8/29/2021 -128
93 7/18/2021 10/18/2021 -101
10 7/18/2021 7/27/2021 -37
7 7/28/2021 8/3/2021 -138
4 8/4/2021 8/7/2021 -132
16 8/8/2021 8/23/2021 -108
34 8/24/2021 9/26/2021 -101
4 9/27/2021 9/30/2021 -101
10 10/1/2021 10/10/2021 -69
10 10/1/2021 10/10/2021 -72
18 10/1/2021 10/18/2021 -101
29 7/7/2021 8/4/2021 -141
7 7/7/2021 7/13/2021 -160
7 7/14/2021 7/20/2021 -151
4 7/21/2021 7/24/2021 -113
7 7/29/2021 8/4/2021 -141
18 7/25/2021 8/11/2021 -132
4 7/25/2021 7/28/2021 -143
7 8/5/2021 8/11/2021 -132
71 6/30/2021 9/8/2021 -139
3 6/30/2021 7/2/2021 -57
15 7/3/2021 7/17/2021 -145
7 7/18/2021 7/24/2021 -40
7 7/25/2021 7/31/2021 -142
4 8/1/2021 8/4/2021 -135
5 8/5/2021 8/9/2021 -139
12 8/10/2021 8/21/2021 -139
4 8/22/2021 8/25/2021 -139
7 8/26/2021 9/1/2021 -111
30 8/10/2021 9/8/2021 -139
32 7/3/2021 8/3/2021 -162
4 7/3/2021 7/6/2021 -58
6 7/7/2021 7/12/2021 -158
3 7/20/2021 7/22/2021 -162
12 7/23/2021 8/3/2021 -162
87 7/3/2021 9/27/2021 -129
77 7/13/2021 9/27/2021 -129
6 7/13/2021 7/18/2021 -157
22 7/24/2021 8/14/2021 -138
20 8/15/2021 9/3/2021 -121
10 9/8/2021 9/17/2021 -98
10 9/18/2021 9/27/2021 -86
10 8/25/2021 9/3/2021 -138
25 8/25/2021 9/18/2021 -138
5 7/19/2021 7/23/2021 -157
4 9/4/2021 9/7/2021 -104
68 7/3/2021 9/8/2021 -124
10 7/3/2021 7/12/2021 -87
20 7/13/2021 8/1/2021 -114
8 8/2/2021 8/9/2021 -59
5 8/10/2021 8/14/2021 -129
7 8/15/2021 8/21/2021 -129
10 8/25/2021 9/3/2021 -129
5 9/4/2021 9/8/2021 -71
104 7/7/2021 10/18/2021 -92
10 7/7/2021 7/16/2021 -155
10 7/7/2021 7/16/2021 -155
30 8/21/2021 9/19/2021 -103
30 8/21/2021 9/19/2021 -103
74 7/17/2021 9/28/2021 -108
8 8/13/2021 8/20/2021 -90
7 7/17/2021 7/23/2021 -118
20 7/24/2021 8/12/2021 -127
5 8/21/2021 8/25/2021 -118
7 8/26/2021 9/1/2021 -118
4 9/5/2021 9/8/2021 -118
10 9/9/2021 9/18/2021 -118
10 9/19/2021 9/28/2021 -51
94 7/17/2021 10/18/2021 -76
13 8/1/2021 8/13/2021 -20
15 7/17/2021 7/31/2021 -139
10 8/14/2021 8/23/2021 -121
7 8/24/2021 8/30/2021 -112
18 8/31/2021 9/17/2021 -104
14 9/23/2021 10/6/2021 -72
4 10/7/2021 10/10/2021 -72
7 10/11/2021 10/17/2021 -46
12 10/7/2021 10/18/2021 -76
73 8/1/2021 10/12/2021 -98
12 8/5/2021 8/16/2021 -17
4 8/1/2021 8/4/2021 -108
5 8/17/2021 8/21/2021 -82
15 8/22/2021 9/5/2021 -109
20 9/6/2021 9/25/2021 -84
10 9/26/2021 10/5/2021 -75
2 9/26/2021 9/27/2021 -98
15 9/28/2021 10/12/2021 -98
47 7/27/2021 9/11/2021 -125
3 8/3/2021 8/5/2021 -105
5 7/27/2021 7/31/2021 -103
6 8/1/2021 8/6/2021 -132
20 8/7/2021 8/26/2021 -125
10 8/27/2021 9/5/2021 -125
16 8/27/2021 9/11/2021 -125
57 8/22/2021 10/17/2021 -83
2 9/7/2021 9/8/2021 -101
4 8/22/2021 8/25/2021 -106
6 9/5/2021 9/10/2021 -102
4 9/11/2021 9/14/2021 -102
12 9/20/2021 10/1/2021 -83
1 10/2/2021 10/2/2021 -83
10 10/3/2021 10/12/2021 -83
15 10/3/2021 10/17/2021 -83
33 8/22/2021 9/23/2021 -96
6 8/22/2021 8/27/2021 -97
3 9/2/2021 9/4/2021 -106
10 8/28/2021 9/6/2021 -109
10 9/7/2021 9/16/2021 -96
7 9/17/2021 9/23/2021 -96
134 6/8/2021 10/19/2021 -105
130 6/8/2021 10/15/2021 -109
100 6/8/2021 9/15/2021 -109
100 6/18/2021 9/25/2021 -109
100 6/28/2021 10/5/2021 -109
100 7/8/2021 10/15/2021 -109
100 7/8/2021 10/15/2021 -104
66 8/12/2021 10/16/2021 -96
50 8/12/2021 9/30/2021 -84
50 8/15/2021 10/3/2021 -89
50 8/28/2021 10/16/2021 -96
36 7/13/2021 8/17/2021 -141
30 7/13/2021 8/11/2021 -142
30 7/16/2021 8/14/2021 -144
30 7/19/2021 8/17/2021 -141
124 6/18/2021 10/19/2021 -102
18 6/18/2021 7/5/2021 -165
10 6/18/2021 6/27/2021 -173
8 6/28/2021 7/5/2021 -165
74 8/7/2021 10/19/2021 -102
10 8/7/2021 8/16/2021 -95
7 8/17/2021 8/23/2021 -116
7 8/20/2021 8/26/2021 -85
10 8/23/2021 9/1/2021 -80
20 9/21/2021 10/10/2021 -111
4 9/2/2021 9/5/2021 -75
4 9/21/2021 9/24/2021 -76
5 9/25/2021 9/29/2021 -51
7 9/28/2021 10/4/2021 -80
15 10/5/2021 10/19/2021 -80
92 7/16/2021 10/15/2021 -87
40 7/16/2021 8/24/2021 -119
40 7/21/2021 8/29/2021 -131
40 8/30/2021 10/8/2021 -94
40 9/6/2021 10/15/2021 -72
20 7/18/2021 8/6/2021 -137
20 7/18/2021 8/6/2021 -137
39 8/15/2021 9/22/2021 -119
15 8/15/2021 8/29/2021 -119
12 8/18/2021 8/29/2021 -119
14 8/22/2021 9/4/2021 -119
12 9/11/2021 9/22/2021 -119
27 9/3/2021 9/29/2021 -103
18 9/3/2021 9/20/2021 -112
18 9/3/2021 9/20/2021 -112
18 9/8/2021 9/25/2021 -100
18 9/12/2021 9/29/2021 -96
87 7/16/2021 10/10/2021 -95
25 7/16/2021 8/9/2021 -134
25 7/21/2021 8/14/2021 -149
25 8/15/2021 9/8/2021 -111
25 8/22/2021 9/15/2021 -98
10 9/16/2021 9/25/2021 -86
15 9/26/2021 10/10/2021 -79
22 9/16/2021 10/7/2021 -98
74 7/8/2021 9/19/2021 -151
74 7/8/2021 9/19/2021 -151
30 7/16/2021 8/14/2021 -54
30 7/8/2021 8/6/2021 -34
30 8/21/2021 9/19/2021 -151
30 8/8/2021 9/6/2021 -87
30 8/19/2021 9/17/2021 -153
20 7/9/2021 7/28/2021 -204
20 7/16/2021 8/4/2021 -197
30 7/25/2021 8/23/2021 -178
12 7/8/2021 7/19/2021 -162
30 9/12/2021 10/11/2021 -98
30 9/12/2021 10/11/2021 -98
12 10/20/2021 10/31/2021 -109
12 10/20/2021 10/31/2021 -109
11 12 13 14
Budgeted Labor Units Actual Labor Units Earned Value Labor Uni
Remaining Labor Units
109876 47855 47855 6334100%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
0 0 0 0%
108336 47855 47855 6180100%
19011 8548 8548 1037400%
1497 1303 1303 19400%
1497 1303 1303 19400%
3638 2012 2012 162600%
1900 1698 1698 20200%
1738 314 314 142400%
8227 4622 4622 360500%
25 25 25 0%
457 457 457 0%
888 425 425 46300%
123 123 123 0%
22 0 0 2200%
1876 1152 1152 72400%
2380 2086 2086 29400%
295 0 0 29500%
308 0 0 30800%
589 354 354 23500%
1264 0 0 126400%
5176 521 521 456600%
230 0 0 23000%
1045 486 486 47000%
41 0 0 4100%
641 0 0 64100%
3123 0 0 312300%
96 35 35 6100%
473 90 90 38300%
33 0 0 3300%
200 90 90 11000%
62 0 0 6200%
178 0 0 17800%
13048 5844 5844 723500%
1130 864 864 26600%
1130 864 864 26600%
3208 1774 1774 143400%
1675 1497 1497 17800%
1533 277 277 125600%
2346 550 550 179600%
106 100 100 600%
672 312 312 36000%
42 42 42 0%
422 7 7 41500%
398 0 0 39800%
375 89 89 28600%
32 0 0 3200%
299 0 0 29900%
6364 2656 2656 373900%
480 480 480 0%
572 273 273 29900%
84 84 84 0%
1890 71 71 181900%
42 0 0 4200%
234 0 0 23400%
1907 1748 1748 19000%
167 0 0 16700%
253 0 0 25300%
735 0 0 73500%
26205 11995 11995 1554600%
16740 9495 9495 858100%
2019 1676 1676 167900%
1958 1676 1676 161800%
61 0 0 6100%
5470 3027 3027 244300%
2857 2554 2554 30300%
2613 473 473 214000%
5518 3258 3257 226000%
257 257 257 0%
691 243 243 44800%
312 276 276 3600%
1271 1271 1271 0%
1923 1059 1059 86400%
186 0 0 18600%
137 103 103 3400%
111 49 49 6200%
630 0 0 63000%
1051 497 498 55400%
691 243 243 44800%
239 202 202 3700%
36 36 36 0%
85 16 16 6900%
213 71 71 14200%
67 44 44 2300%
146 27 27 11900%
2069 932 932 113700%
161 161 161 0%
265 265 265 0%
16 16 16 0%
691 243 243 44800%
239 202 202 3700%
45 0 0 4500%
240 0 0 24000%
1 0 0 100%
119 45 45 7400%
292 0 0 29200%
400 34 34 36600%
8 8 8 0%
37 26 26 1100%
248 0 0 24800%
107 0 0 10700%
9465 2500 2500 696500%
8681 1810 1810 687100%
471 0 0 47100%
3016 960 960 205600%
3071 472 472 259900%
747 126 126 62100%
773 245 245 52800%
56 0 0 5600%
272 0 0 27200%
51 0 0 5100%
224 7 7 21700%
784 690 690 9400%
83 83 83 0%
560 560 560 0%
34 34 34 0%
10 0 0 1000%
68 0 0 6800%
16 0 0 1600%
13 13 13 0%
20021 11445 11445 857600%
1138 964 964 17400%
1138 964 964 17400%
1666 922 922 74400%
1666 922 922 74400%
1898 1704 1704 19400%
82 82 82 0%
212 212 212 0%
1408 1383 1383 2500%
15 0 0 1500%
108 0 0 10800%
30 0 0 3000%
16 0 0 1600%
27 27 27 0%
5484 2711 2711 277300%
148 148 148 0%
595 583 583 1200%
919 323 323 59600%
236 156 156 8000%
2568 579 579 198900%
764 750 750 1400%
58 0 0 5800%
172 172 172 0%
24 0 0 2400%
4030 3157 3157 87300%
290 290 290 0%
200 200 200 0%
214 214 214 0%
1234 885 885 34900%
1523 1467 1467 5600%
145 101 101 4400%
81 0 0 8100%
343 0 0 34300%
2697 1132 1132 156500%
17 17 17 0%
47 47 47 0%
549 549 549 0%
1409 519 519 89000%
136 0 0 13600%
539 0 0 53900%
1919 429 429 149000%
23 7 7 1600%
33 33 33 0%
327 48 48 27900%
35 0 0 3500%
874 341 341 53300%
50 0 0 5000%
97 0 0 9700%
480 0 0 48000%
1189 426 426 76300%
55 55 55 0%
44 0 0 4400%
363 56 56 30700%
619 315 315 30400%
108 0 0 10800%
28362 8932 8933 1947200%
5968 998 998 501200%
638 0 0 63800%
234 0 0 23400%
2933 0 0 293300%
209 0 0 20900%
1954 998 998 99800%
2619 650 651 196900%
67 46 46 2100%
94 22 22 7200%
2458 582 582 187600%
2619 650 651 196900%
67 46 46 2100%
94 22 22 7200%
2458 582 582 187600%
12171 6218 6217 595300%
162 156 156 600%
114 109 109 500%
48 47 47 100%
2582 1668 1668 91400%
587 587 587 0%
379 371 371 800%
182 182 182 0%
58 58 58 0%
672 0 0 67200%
293 293 293 0%
86 86 86 0%
91 91 91 0%
13 0 0 1300%
221 0 0 22100%
5321 3005 3005 231600%
706 591 591 11500%
2623 1247 1247 137600%
932 319 319 61300%
1060 848 848 21200%
1542 1137 1137 40500%
1542 1137 1137 40500%
2564 252 252 231200%
217 116 116 10100%
208 136 136 7200%
1299 0 0 129900%
840 0 0 84000%
654 2 2 65200%
133 0 0 13300%
93 0 0 9300%
124 2 2 12200%
304 0 0 30400%
4331 414 414 391700%
76 64 64 1200%
3367 0 0 336700%
485 234 234 25100%
90 73 73 1700%
56 35 35 2100%
174 8 8 16600%
83 0 0 8300%
1689 1091 1091 59800%
1689 1091 1091 59800%
32 32 32 0%
426 426 426 0%
353 353 353 0%
193 193 193 0%
97 0 0 9700%
104 27 27 7700%
18 16 16 200%
313 44 44 26900%
153 0 0 15300%
770 0 0 77000%
770 0 0 77000%
770 0 0 77000%
770 0 0 77000%
15 16 17
Schedule % Complete Performance % Complete - Labor Units Performance % Complete - Labor Units3
0% 43.55% 0.3686
0% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
0% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
0% 0% 1
0% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
0% 0% 1
100% 0% 1
100% 0% 1
0% 0% 1
100% 0% 1
100% 0% 1
100% 0% 1
0% 44% 0.3247
0% 44.96% 0.3461
0% 87.05% 0.6399
100% 87.05% 0.6399
0% 55.30% 0.4093
100% 89.37% 0.7202
100.00% 18.06% 0.0694
0% 56.18% 0.4213
100% 100% 1
100% 100% 1
100.00% 47.81% 0.2691
100.00% 100% 1
100.00% 1% 0
100.00% 61.41% 0.1812
100.00% 87.65% 0.8105
100% 0% 0
100% 0% 0
100.00% 60.10% 0.6
100% 0% 0
0% 10% 0.0596
100% 0% 0
100% 46.48% 0.2619
100% 0% 0
100% 0% 0
100% 0% 0
100.00% 36.46% 0.3646
0% 19.03% 0.0592
100% 0% 0
100.00% 45% 0.14
100% 0% 0
100% 0% 0
0% 44.79% 0.4064
0% 76% 1
100.00% 76.45% 0.6672
0% 55.29% 0.1355
100.00% 89.37% 0.5551
100.00% 18.06% 0.225
0.00% 23.45% 0.9765
100% 94% 0
100% 46.48% 0.5988
100% 100% 0
100% 1.66% 0.3449
100% 0.00% 0.6576
100% 23.67% 0.6576
100% 0.00% 0.4092
100.00% 0.00% 0.7202
0.00% 41.74% 0.0693
100% 100.00% 0.1613
100.00% 47.81% 0.82
100% 100.00% 0.2619
100% 4% 1
100.00% 0.00% 0.0166
100% 0% 0
100.00% 91.65% 0.2367
100% 0% 0
100% 0% 0
100% 0.00% 0.3138
0.00% 45.77% 1
0.00% 56.72% 0.2694
0.00% 83.00% 1
100.00% 85.59% 0.0077
100% 0% 0
0% 55% 0
100.00% 89.41% 0.5189
100% 18% 0
0% 59% 0
100% 100% 0
100% 35.14% 0.3607
100% 88.31% 0.4184
100% 100.00% 0.6558
100% 55.05% 0.6762
100% 0% 0
100% 75.18% 0.4092
100.00% 44.14% 0.72
100.00% 0% 0.0693
0% 47.34% 0.4368
100% 35% 1
100% 84.68% 0.1355
100% 100.00% 0.739
100.00% 19.28% 0.833
0% 33.45% 0.349
100% 66% 0
100.00% 18.37% 0.365
0.00% 45.06% 0.4414
100% 100% 0
100% 100.00% 0.2385
100% 100.00% 0.1355
100% 35.14% 0.6572
100% 85% 0
100% 0% 0
100% 0.00% 0.1259
100% 0% 0
100.00% 37.82% 0.1837
100% 0.00% 0.3479
0% 9% 1
100% 100.00% 0.9321
100% 70% 1
100% 0.00% 0.1355
100.00% 0.00% 0.6572
0% 26% 0
0% 21% 0
100% 0% 0
100.00% 31.83% 0.3782
100% 15% 0
100% 16.89% 0.085
100% 32% 1
100% 0.00% 0.7027
100% 0% 0
100% 0% 0
100% 3.11% 0.2587
0% 88.01% 0.2085
100% 100% 0
100% 100.00% 0.3183
100.00% 100.00% 0.1537
100.00% 0.00% 0.1689
100.00% 0.00% 0.3165
100% 0% 0
100% 100% 0
0% 57% 0
0% 84.72% 0.0311
100% 84.72% 0.815
0% 55% 1
100% 55.35% 0.9321
0.00% 90% 1
100% 100% 0
100% 100% 0
100% 98% 0
100% 0% 0
100% 0.00% 0.4228
100% 0% 0.6572
100% 0% 0.6572
100% 100.00% 0.4092
0.00% 49.44% 0.4092
100% 100.00% 0.8272
100.00% 97.98% 0.9634
100% 35% 0.9717
100.00% 66.10% 0.9027
100% 23% 0
100% 98% 0
100% 0% 0
100% 100% 0
100.00% 0.00% 0.51
0% 78.33% 0.5438
100% 100% 1
100% 100% 0.66
100% 100% 1
100.00% 71.70% 0.1804
100.00% 96.32% 0.8752
100% 70% 0
100% 0% 0
100% 0% 0
0% 41.97% 0.2581
100% 100% 0.2941
100% 100% 1
100.00% 100.00% 0.668
100% 36.83% 0.1959
100% 0% 0
100% 0% 0
0% 22.35% 0.0202
100% 30% 0
100% 100% 0.6
100% 15% 0
100% 0% 0
100% 38.99% 0.0217
100% 0% 0
100% 0% 0
100% 0% 0
0% 35.79% 0.1848
100% 100% 0.69
100% 0% 0
100.00% 15.43% 0.1543
100% 51% 0.2032
100% 0% 0
0% 31.49% 0.2206
0% 16.71% 0.1671
100% 0% 0
100% 0% 0
100% 0% 0
100% 0% 0
100.00% 51.05% 0.5105
0% 24.86% 0.0867
100% 69% 0
100% 24% 0
100.00% 23.69% 0.0924
0% 24.86% 0.0865
100% 69% 0
100% 24% 0
100% 23.69% 0.0922
0% 51.08% 0.3645
0% 96.29% 0.7716
100% 95.61% 0.7719
100% 97.92% 0.7708
0% 64.59% 0.5433
100.00% 100% 0.8514
100.00% 97.80% 0.4132
100.00% 100% 0.9869
100% 100% 0
100% 0% 0
100% 100.00% 0.85
100% 100% 0
100.00% 100.00% 0.985
100% 0% 0
100% 0% 0
0% 56.48% 0.3892
100.00% 83.67% 0.5336
100.00% 47.55% 0.2091
100.00% 34.23% 0.3423
100.00% 80.02% 0.5214
0% 73.72% 0.4406
100.00% 73.72% 0.4406
0% 9.81% 0.0058
100% 53.26% 0.0688
100% 65% 0
100% 0% 0
100% 0% 0
0% 0.31% 0.0031
100% 0% 0
100% 0% 0
100.00% 1.63% 0.0163
100% 0% 0
0% 9.56% 0.0014
100% 84% 0
100% 0% 0
100% 48% 0
100% 81% 0
100% 62.50% 0.0357
100.00% 4.57% 0.0229
100% 0% 0
0% 64.61% 0.3512
0% 64.61% 0.3512
100% 100% 1
100% 100% 0
100% 100.00% 0.8083
100.00% 100% 0
100% 0% 0
100% 26% 0
100.00% 89% 0
100.00% 14% 0
100% 0.00% 0.4989
0% 0% 0
100% 0% 0
0% 0% 0
100% 0% 0
SEM ACTUAL
Columna1 Activity ID Activity Nam Original DuraStart Finish BL Project DuBL Project Sta
CONSTRUCCIÓ
CONSTRUCCIÓN DE ALMACÉN 349 ### 2/16/2022 237 3/9/2021
HITOS HITOS 344 ### 2/15/2022 237 3/9/2021
Principales Principales 344 ### 2/15/2022 237 3/9/2021
H0100 H0100 Carta de Adju 0 ### 0 3/9/2021
H1000 H1000 Hito de Inici 0 ### 0 4/16/2021
H1010 H1010 Fin del proye 0 2/15/2022 0
Intermedios Intermedios 343 ### 2/15/2022 207 4/8/2021
H1020 H1020 Aprobación d 0 ### 0 4/8/2021
H1025 H1025 Aprobación d 0 ### 0 5/7/2021
H1030 H1030 Entrega de T 0 ### 0 5/4/2021
H1040 H1040 Inicio de Obr 0 ### 0 5/5/2021
H2000 H2000 Inicio de Con 0 ### 0 5/17/2021
H2010 H2010 Fin de Constr 0 2/3/2022 0
H2020 H2020 Fin de Obra 0 2/15/2022 0
INGENIERÍA INGENIERÍA 0 ### ### 0 3/17/2021
E1000 E1000 Entrega de Ing 0 ### 0 3/17/2021
E2000 E2000 Entrega de Ing 0 ### 0 3/17/2021
E3000 E3000 Entrega de In 0 ### 0 3/17/2021
E4000 E4000 Entrega de Ing 0 ### 0 3/17/2021
E5000 E5000 Entrega de In 0 ### 0 3/17/2021
PROCURA PROCURA 96 11/12/2021 2/16/2022 109 6/15/2021
Módulo A - A Módulo A - Almacén de 15 11/12/2021 11/27/2021 35 7/22/2021
P1020 P1020 [Eléctrica] - 0 11/12/2021 0 7/22/2021
P1021 P1021 [Eléctrica] - 0 11/22/2021 0 8/21/2021
P1022 P1022 [Eléctrica] 0 11/12/2021 0 7/22/2021
P1023 P1023 [Eléctrica] 0 11/22/2021 0 8/21/2021
P1024 P1024 [Eléctrica] 0 11/12/2021 0 7/22/2021
P1025 P1025 [Eléctrica] 0 11/22/2021 0 8/21/2021
P1030 P1030 [Mecánico] - 0 11/12/2021 0 7/27/2021
P1031 P1031 [Mecánico] - 0 11/27/2021 0 8/26/2021
Módulo C - A Módulo C - Almacén Te 0 11/12/2021 11/12/2021 30 7/16/2021
P2010 P2010 [Eléctrica] - 0 11/12/2021 0 7/16/2021
P2011 P2011 [Eléctrica] - 0 11/12/2021 0 8/15/2021
Módulo D - A Módulo D - Almacén Tem 0 11/12/2021 11/12/2021 30 7/28/2021
P3020 P3020 [Eléctrica] 0 11/12/2021 0 7/28/2021
P3021 P3021 [Eléctrica] 0 11/12/2021 0 8/27/2021
P3030 P3030 [Eléctrica] 0 11/12/2021 0 7/28/2021
P3031 P3031 [Eléctrica] 0 11/12/2021 0 8/27/2021
P3040 P3040 [Eléctrica] 0 11/12/2021 0 7/28/2021
P3041 P3041 [Eléctrica] 0 11/12/2021 0 8/27/2021
P3050 P3050 [Mecánico] - 0 11/12/2021 0 7/28/2021
P3051 P3051 [Mecánico] - 0 11/12/2021 0 8/27/2021
P3060 P3060 [Mecánico] - 0 11/12/2021 0 7/28/2021
P3061 P3061 [Mecánico] - 0 11/12/2021 0 8/27/2021
P3070 P3070 [Eléctrica] 0 11/12/2021 0 7/28/2021
P3071 P3071 [Eléctrica] 0 11/12/2021 0 8/27/2021
P3080 P3080 [Eléctrica] 0 11/12/2021 0 7/28/2021
P3081 P3081 [Eléctrica] 0 11/12/2021 0 8/27/2021
P3090 P3090 [Eléctrica] - 0 11/12/2021 0 7/28/2021
P3091 P3091 [Eléctrica] - 0 11/12/2021 0 8/27/2021
Módulo E - R Módulo E - Rampa de D 0 11/12/2021 11/12/2021 15 9/17/2021
P4010 P4010 [Eléctrica] 0 11/12/2021 0 9/17/2021
P4011 P4011 [Eléctrica] 0 11/12/2021 0 10/2/2021
P4020 P4020 [Eléctrica] 0 11/12/2021 0 9/17/2021
P4021 P4021 [Eléctrica] 0 11/12/2021 0 10/2/2021
P4030 P4030 [Eléctrica] 0 11/12/2021 0 9/17/2021
P4031 P4031 [Eléctrica] 0 11/12/2021 0 10/2/2021
P4040 P4040 [Eléctrica] 0 11/12/2021 0 9/17/2021
P4041 P4041 [Eléctrica] 0 11/12/2021 0 10/2/2021
Módulo F - A Módulo F - Almacén Tem 17 11/12/2021 11/29/2021 30 8/22/2021
P5010 P5010 [Eléctrica] 0 11/12/2021 0 8/22/2021
P5011 P5011 [Eléctrica] 0 11/29/2021 0 9/21/2021
P5020 P5020 [Eléctrica] - 0 11/12/2021 0 8/22/2021
P5021 P5021 [Eléctrica] - 0 11/29/2021 0 9/21/2021
Módulo H - A Módulo H - Almacén de 6 11/12/2021 11/18/2021 15 9/12/2021
P6010 P6010 [Eléctrica] 0 11/12/2021 0 9/12/2021
P6011 P6011 [Eléctrica] 0 11/18/2021 0 9/27/2021
Módulo K: Sis Módulo K: Sistema de Co 12 11/12/2021 11/24/2021 30 8/1/2021
P6030 P6030 [Mecánico] 0 11/12/2021 0 8/1/2021
P6031 P6031 [Mecánico] 0 11/24/2021 0 8/31/2021
P6040 P6040 [Mecánico] - 0 11/12/2021 0 8/16/2021
P6041 P6041 [Mecánico] - 0 11/24/2021 0 8/31/2021
P6060 P6060 [Mecánico] - 0 11/12/2021 0 8/1/2021
P6061 P6061 [Mecánico] - 0 11/24/2021 0 8/31/2021
Módulo L: Ra Módulo L: Rampa del Si 19 11/12/2021 12/1/2021 15 8/5/2021
P7010 P7010 [Eléctrica] 0 11/12/2021 0 8/5/2021
P7011 P7011 [Eléctrica] 0 12/1/2021 0 8/20/2021
Módulo O Y P: Módulo O Y P: Taller Me 15 11/12/2021 11/27/2021 15 9/7/2021
P7020 P7020 [Eléctrica] 0 11/12/2021 0 9/7/2021
P7021 P7021 [Eléctrica] 0 11/27/2021 0 9/22/2021
P7030 P7030 [Eléctrica] 0 11/12/2021 0 9/7/2021
P7031 P7031 [Eléctrica] 0 11/27/2021 0 9/22/2021
P7040 P7040 [Eléctrica] 0 11/12/2021 0 9/7/2021
P7041 P7041 [Eléctrica] 0 11/27/2021 0 9/22/2021
Módulo R: Ser Módulo R: Servicios Higi 7 11/12/2021 11/19/2021 30 6/15/2021
P7500 P7500 [Eléctrica] - 0 11/12/2021 0 6/15/2021
P7510 P7510 [Eléctrica] - 0 11/19/2021 0 7/15/2021
Módulo S: Cis Módulo S: Cisterna 17 11/12/2021 11/29/2021 37 7/11/2021
P8000 P8000 [Mecánico] - 0 11/12/2021 0 7/11/2021
P8001 P8001 [Mecánico] - 0 11/12/2021 0 7/31/2021
P8010 P8010 [Mecánico] - 0 11/12/2021 0 7/11/2021
P8011 P8011 [Mecánico] 0 11/12/2021 0 7/31/2021
P8020 P8020 [Instrument 0 11/12/2021 0 7/28/2021
P8021 P8021 [Instrument 0 11/29/2021 0 8/17/2021
Subestación Subestación de 600KVA 9 11/12/2021 11/21/2021 30 8/1/2021
P9010 P9010 [Eléctrica] 0 11/12/2021 0 8/1/2021
P9011 P9011 [Eléctrica] 0 11/21/2021 0 8/31/2021
P9020 P9020 [Eléctrica] 0 11/12/2021 0 8/1/2021
P9021 P9021 [Eléctrica] 0 11/21/2021 0 8/31/2021
P9030 P9030 [Eléctrica] - 0 11/12/2021 0 8/24/2021
P9031 P9031 [Eléctrica] - 0 11/21/2021 0 8/31/2021
P9040 P9040 [Instrumentac 0 11/12/2021 0 8/1/2021
P9041 P9041 [Instrumentac 0 11/21/2021 0 8/31/2021
Instrumentaci Instrumentación y Contr 96 11/12/2021 2/16/2022 37 8/15/2021
P9100 P9100 [Instrumenta 0 11/12/2021 0 8/22/2021
P9110 P9110 [Instrumenta 0 1/8/2022 0 9/11/2021
P9120 P9120 [Instrumenta 0 11/12/2021 0 9/1/2021
P9130 P9130 [Instrumenta 0 2/16/2022 0 9/21/2021
P9140 P9140 [Instrumenta 0 11/12/2021 0 9/1/2021
P9150 P9150 [Instrumenta 0 2/16/2022 0 9/21/2021
P9160 P9160 [Instrumenta 0 11/12/2021 0 9/1/2021
P9170 P9170 [Instrumenta 0 2/16/2022 0 9/21/2021
P9180 P9180 [Instrumenta 0 11/12/2021 0 8/15/2021
P9190 P9190 [Instrumenta 0 11/28/2021 0 9/4/2021
PRELIMINARE PRELIMINARES Y PROVIS 52 ### 14-06-21 17: 98 3/9/2021
RECLUTAMIE RECLUTAMIENTO 52 ### 10-06-21 17: 94 3/9/2021
T1000 T1000 Reclutamiento 52 ### 29-04-21 17: 52 3/9/2021
T1010 T1010 Selección y r 45 ### 26-04-21 17: 45 3/13/2021
T1020 T1020 Presentación 33 ### 26-04-21 17: 33 3/25/2021
T1030 T1030 Presentación 4 ### 16-03-21 17: 4 3/13/2021
T1040 T1040 Selección y r 45 ### 10-06-21 17: 45 4/27/2021
ELABORACIÓN ELABORACIÓN DE PLAN 37 ### 24-04-21 17: 37 3/19/2021
T1050 T1050 Elaboración d 37 ### 24-04-21 17: 37 3/19/2021
MOVILIZACIÓ MOVILIZACIÓN 40 ### 14-06-21 17: 47 4/29/2021
T1060 T1060 Cuarentena d 2 ### 30-04-21 17: 2 4/29/2021
T1070 T1070 Capacitacione 5 ### 05-05-21 17: 5 5/1/2021
T1080 T1080 Movilización 40 ### 14-06-21 17: 40 5/6/2021
OBRAS PROVI OBRAS PROVISIONALES 17 ### 22-05-21 17: 15 5/8/2021
T1090 T1090 Instalación d 15 ### 22-05-21 17: 15 5/8/2021
T1100 T1100 Instalación de 15 ### 22-05-21 17: 15 5/8/2021
OBRAS PRELI OBRAS PRELIMINARES 12 ### 18-05-21 17: 9 5/10/2021
T1110 T1110 Trazo y repla 2 ### 11-05-21 17: 2 5/10/2021
T1120 T1120 Revisión y va 5 ### 16-05-21 17: 5 5/12/2021
T1130 T1130 Señalización 5 ### 18-05-21 17: 5 5/14/2021
CONSTRUCCI CONSTRUCCIÓN 324 ### 2/15/2022 144 5/29/2021
SECTOR 1 SECTOR 1 275 ### 1/2/2022 113 5/29/2021
Movimiento d Movimiento de Tierras 10 ### 11/15/2021 10 5/29/2021
C1000 C1000 [M. Tierras] - 10 ### 11/15/2021 10 5/29/2021
Sistema de Re Sistema de Red de Agu 36 ### 12/2/2021 50 6/13/2021
C1200 C1200 [M. Tierras] - 15 ### 11/16/2021 15 6/13/2021
C1210 C1210 [Sanitaria] - 30 ### 12/2/2021 30 7/3/2021
08. Módulo 08. Módulo D: ALM 62 ### 12/1/2021 103 6/8/2021
C1300 C1300 [Concreto] - 1 ### 20-06-21 17: 1 6/8/2021
C1310 C1310 [Concreto] - 12 ### 12-09-21 17: 12 6/9/2021
C1320 C1320 [Eléctrica] - 7 ### 11/16/2021 7 6/21/2021
C1330 C1330 [M. Tierras] - 5 ### ### 5 6/28/2021
C1340 C1340 [Concreto] - 1 ### 11/12/2021 1 7/3/2021
C1350 C1350 [Concreto] - 24 ### 12/1/2021 24 7/4/2021
C1360 C1360 [Estructuras] 25 ### 11/13/2021 25 8/7/2021
C1370 C1370 [Eléctrica] - 5 11/17/2021 11/21/2021 5 9/1/2021
C1375 C1375 [Sanitaria] - 7 11/22/2021 11/28/2021 7 9/6/2021
C1377 C1377 [Estructuras] 5 ### 11/13/2021 5 9/13/2021
C1380 C1380 [Eléctrica] - 18 11/14/2021 12/1/2021 18 9/1/2021
06. Módulo B 06. Módulo B: LOSA 54 ### 1/2/2022 67 6/23/2021
C1500 C1500 [M. Tierras] 5 12/1/2021 12/5/2021 5 6/23/2021
C1510 C1510 [Eléctrica] - 8 ### 11/16/2021 8 7/5/2021
C1520 C1520 [M. Tierras] - 7 11/17/2021 11/23/2021 7 7/13/2021
C1521 C1521 [Geotextil] - 12 11/24/2021 12/5/2021 12 7/20/2021
C1530 C1530 [Concreto] - 21 12/11/2021 12/31/2021 21 8/6/2021
C1550 C1550 [Estructuras] 2 ### 1/2/2022 2 8/27/2021
07. Módulo 07. Módulo C: ALM 38 ### 12/13/2021 20 8/7/2021
C1600 C1600 [Concreto] - 2 12/12/2021 12/13/2021 2 8/7/2021
C1610 C1610 [Estructuras] 5 ### 11/15/2021 5 8/15/2021
C1620 C1620 [Eléctrica] - 1 11/17/2021 11/17/2021 1 8/20/2021
C1630 C1630 [Eléctrica] - 6 11/18/2021 11/23/2021 6 8/21/2021
SECTOR 2 SECTOR 2 87 ### 12/16/2021 126 6/8/2021
Movimiento d Movimiento de Tierras 10 ### ### 10 6/8/2021
C2000 C2000 [M. Tierras] - 10 ### 11/16/2021 10 6/8/2021
Sistema de Re Sistema de Red de Agu 37 ### 12/3/2021 40 6/28/2021
C2200 C2200 [M. Tierras] - 10 ### 11/14/2021 10 6/28/2021
C2210 C2210 [Concreto] - 25 ### 12/3/2021 25 7/13/2021
23.2 Subestac 23.2 Subestación de 51 ### 12/13/2021 79 7/25/2021
C5200 C5200 [Concreto] - 15 10/7/2021 11/18/2021 15 7/25/2021
C5210 C5210 [Eléctrica] - 8 ### 11/19/2021 8 8/9/2021
C5220 C5220 [M. Tierras] - 5 10/6/2021 07-10-21 17: 5 8/17/2021
C5230 C5230 [Concreto] - 7 ### 11/18/2021 7 8/22/2021
C5240 C5240 [Eléctrica] - 10 ### 12/5/2021 10 9/5/2021
C5250 C5250 [Estructuras] 10 ### 11/18/2021 10 9/7/2021
C5260 C5260 [Sanitaria] - 8 ### 11/26/2021 8 9/17/2021
C5270 C5270 [Eléctrica] - 25 ### 12/13/2021 25 9/17/2021
05. Módulo 05. Módulo A: ALMA 64 ### 12/16/2021 99 6/8/2021
C5700 C5700 [Concreto] - 20 ### 11/15/2021 20 6/8/2021
C5710 C5710 [Eléctrica] - 7 ### 11/15/2021 7 6/28/2021
C5720 C5720 [M. Tierras] - 4 ### 11-11-21 17: 4 6/28/2021
C5730 C5730 [Concreto] - 20 ### ### 20 7/2/2021
C5740 C5740 [Mecánica] - 5 ### 12/6/2021 5 8/31/2021
C5750 C5750 [Eléctrica] - 5 11/27/2021 12/1/2021 5 8/26/2021
C5760 C5760 [Estructuras] 35 ### 11/26/2021 35 7/22/2021
C5770 C5770 [Carpintería] 10 11/27/2021 12/6/2021 10 8/26/2021
C5780 C5780 [Sanitaria] - 14 11/27/2021 12/10/2021 14 8/26/2021
C5790 C5790 [Eléctrica] - 15 ### 12/16/2021 15 8/31/2021
SECTOR 3 SECTOR 3 89 ### 12/30/2021 123 6/18/2021
SECTOR 3.1 SECTOR 3.1 86 ### 12/23/2021 123 6/18/2021
Movimiento d Movimiento de Tierra 39 ### 11/30/2021 27 6/18/2021
C3000 C3000 [M. Tierras] - 12 ### 11/15/2021 12 6/18/2021
C3010 C3010 [Eléctrica] - 15 11/15/2021 11/30/2021 15 6/30/2021
Sistema de Re Sistema de Red de Ag 46 9/1/2021 12/1/2021 46 7/15/2021
C3200 C3200 [M. Tierras] - 20 ### 11/21/2021 20 7/15/2021
C3210 C3210 [Concreto] - 25 9/1/2021 12/1/2021 25 8/5/2021
19. Módulo O 19. Módulo O Y P 56 6/14/2021 12/23/2021 93 7/18/2021
C4300 C4300 [Concreto] - 10 6/16/2021 02-09-21 17: 10 7/18/2021
C4310 C4310 [Eléctrica] - 7 ### 11/14/2021 7 7/28/2021
C4320 C4320 [M. Tierras] - 4 ### 11/12/2021 4 8/4/2021
C4330 C4330 [Concreto] - 16 ### 11/14/2021 16 8/8/2021
C4340 C4340 [Estructuras] 34 ### 12/1/2021 34 8/24/2021
C4350 C4350 [Eléctrica] - 4 12/2/2021 12/5/2021 4 9/27/2021
C4360 C4360 [Carpintería] 10 ### 11/18/2021 10 10/1/2021
C4370 C4370 [Sanitaria] - 10 ### 11/16/2021 10 10/1/2021
C4380 C4380 [Eléctrica] - 18 ### 12/23/2021 18 10/1/2021
17. Módulo 17. Módulo M: AL 38 ### 12/8/2021 29 7/7/2021
C4400 C4400 [Eléctrica] - 7 ### ### 7 7/7/2021
C4410 C4410 [M. Tierras] - 7 ### 11/18/2021 7 7/14/2021
C4420 C4420 [Concreto] - 4 ### 11/22/2021 4 7/21/2021
C4430 C4430 [Estructuras] 7 ### 12/8/2021 7 7/29/2021
18. Módulo N 18. Módulo N: ALM 23 ### 11/26/2021 18 7/25/2021
C4500 C4500 [Concreto] - 4 11/23/2021 11/26/2021 4 7/25/2021
C4510 C4510 [Estructuras] 7 ### 11/16/2021 7 8/5/2021
21. Módulo S 21. Módulo S: CISTER 51 ### 12/21/2021 71 6/30/2021
C4600 C4600 [M. Tierras] - 3 7/3/2021 28-08-21 17: 3 6/30/2021
C4610 C4610 [Concreto] - 15 ### 11/16/2021 15 7/3/2021
C4611 C4611 [M. Tierras] - 7 ### 02-09-21 17: 7 7/18/2021
C4620 C4620 [Eléctrica] - M 7 ### 11/18/2021 7 7/25/2021
C4630 C4630 [M. Tierras] - 4 9/1/2021 11/13/2021 4 8/1/2021
C4640 C4640 [Sanitaria] - 5 11/17/2021 11/21/2021 5 8/5/2021
C4650 C4650 [Sanitaria] - 12 ### 12/3/2021 12 8/10/2021
C4660 C4660 [Instrumentac 4 12/4/2021 12/7/2021 4 8/22/2021
C4670 C4670 [Estructuras] 7 ### 11/16/2021 7 8/26/2021
C4680 C4680 [Eléctrica] - 30 ### 12/21/2021 30 8/10/2021
20. Módulo R 20. Módulo R: SERVI 36 ### ### 32 7/3/2021
C4700 C4700 [M. Tierras] - 4 ### 02-09-21 17: 4 7/3/2021
C4710 C4710 [Concreto] - 6 ### ### 6 7/7/2021
C4720 C4720 [Estructuras] 3 ### 11/26/2021 3 7/20/2021
C4730 C4730 [Eléctrica] - 12 ### 12/8/2021 12 7/23/2021
SECTOR 3.2 SECTOR 3.2 79 8/20/2021 12/30/2021 87 7/3/2021
16. Módulo 16. Módulo L: RAM 79 9/1/2021 12/30/2021 77 7/13/2021
C3400 C3400 [M. Tierras] 6 11/12/2021 11/17/2021 6 7/13/2021
C3410 C3410 [Concreto] - 22 ### 11/25/2021 22 7/24/2021
C3420 C3420 [Concreto] - 20 9/1/2021 11/28/2021 20 8/15/2021
C3430 C3430 [Concreto] - 10 ### 11/19/2021 10 9/8/2021
C3440 C3440 [Estructuras] 10 ### ### 10 9/18/2021
C3450 C3450 [Eléctrica] - 10 ### 12/15/2021 10 8/25/2021
C3460 C3460 [Eléctrica] - 25 12/6/2021 12/30/2021 25 8/25/2021
C3470 C3470 [Geotextil] - 5 11/18/2021 11/22/2021 5 7/19/2021
C3480 C3480 [M. Tierras] - 4 ### 11/15/2021 4 9/4/2021
15. SISTEMA 15. SISTEMA DE CO 36 ### 12/11/2021 68 7/3/2021
C3300 C3300 [M. Tierras] 10 8/20/2021 07-10-21 17: 10 7/3/2021
C3310 C3310 [Concreto] - 20 ### 11/16/2021 20 7/13/2021
C3311 C3311 [M. Tierras] - 8 ### 07-10-21 17: 8 8/2/2021
C3320 C3320 [Geotextil] - 5 ### 11/16/2021 5 8/10/2021
C3330 C3330 [Sanitaria] - 7 ### 11/23/2021 7 8/15/2021
C3350 C3350 [Sanitaria] - 10 11/27/2021 12/6/2021 10 8/25/2021
C3360 C3360 [Carpintería] 5 12/7/2021 12/11/2021 5 9/4/2021
SECTOR 4 SECTOR 4 83 6/4/2021 12/20/2021 104 7/7/2021
Movimiento d Movimiento de Tierras 10 ### 11/15/2021 10 7/7/2021
C4000 C4000 [M. Tierras] - 10 ### 11/15/2021 10 7/7/2021
Sistema de Re Sistema de Red de Agu 30 ### ### 30 8/21/2021
C4200 C4200 [Concreto] - 30 ### 11/28/2021 30 8/21/2021
14. Módulo K 14. Módulo K: SISTE 49 ### ### 74 7/17/2021
C2500 C2500 [M. Tierras] - 8 9/1/2021 11/13/2021 8 8/13/2021
C2501 C2501 [M. Tierras] 7 8/30/2021 11/12/2021 7 7/17/2021
C2510 C2510 [Concreto] - 20 7/1/2021 11/14/2021 20 7/24/2021
C2520 C2520 [Geotextil] - 5 11/14/2021 11/18/2021 5 8/21/2021
C2530 C2530 [Sanitaria] - 7 ### 11/25/2021 7 8/26/2021
C2540 C2540 [Mecánica] - 4 ### 12/2/2021 4 9/5/2021
C2550 C2550 [Sanitaria] - 10 ### 12/12/2021 10 9/9/2021
C2560 C2560 [Carpintería] 10 ### 11/14/2021 10 9/19/2021
09. Módulo 09. Módulo E: RAMP 70 ### 11/28/2021 94 7/17/2021
C1400 C1400 [Concreto] - 13 ### 02-09-21 17: 13 8/1/2021
C1401 C1401 [M. Tierras] - 15 ### 11/16/2021 15 7/17/2021
C1410 C1410 [Eléctrica] - 10 ### ### 10 8/14/2021
C1420 C1420 [M. Tierras] - 7 ### 11/15/2021 7 8/24/2021
C1430 C1430 [Concreto] - 18 7/21/2021 11/25/2021 18 8/31/2021
C1440 C1440 [Estructuras] 14 9/1/2021 11/12/2021 14 9/23/2021
C1450 C1450 [Sanitaria] - 4 11/13/2021 11/16/2021 4 10/7/2021
C1460 C1460 [Estructuras] 7 10/13/2021 11/13/2021 7 10/11/2021
C1480 C1480 [Eléctrica] - 12 ### 11/28/2021 12 10/7/2021
10. Módulo 10. Módulo F: ALMA 50 ### 12/20/2021 73 8/1/2021
C2300 C2300 [Concreto] - 12 ### 02-09-21 17: 12 8/5/2021
C2301 C2301 [M. Tierras] - 4 ### 11/13/2021 4 8/1/2021
C2310 C2310 [M. Tierras] - 5 ### 11-11-21 18: 5 8/17/2021
C2320 C2320 [Concreto] - 15 ### 11/22/2021 15 8/22/2021
C2330 C2330 [Estructuras] 20 ### 11/14/2021 20 9/6/2021
C2340 C2340 [Sanitaria] - 10 11/15/2021 11/24/2021 10 9/26/2021
C2350 C2350 [Eléctrica] - 2 12/4/2021 12/5/2021 2 9/26/2021
C2360 C2360 [Eléctrica] - 15 12/6/2021 12/20/2021 15 9/28/2021
11. Módulo 11. Módulo G: REVEG 57 ### 12/13/2021 47 7/27/2021
C2400 C2400 [Concreto] - 3 11/5/2021 11/13/2021 3 8/3/2021
C2401 C2401 [M. Tierras] - 5 ### 11-11-21 17: 5 7/27/2021
C2410 C2410 [Concreto] - 6 ### 11/13/2021 6 8/1/2021
C2420 C2420 [Estructuras] 20 ### 11/27/2021 20 8/7/2021
C2430 C2430 [Sanitaria] - 10 11/28/2021 12/7/2021 10 8/27/2021
C2440 C2440 [Eléctrica] - 16 11/28/2021 12/13/2021 16 8/27/2021
12. Módulo 12. Módulo H: ALMA 56 ### 12/8/2021 57 8/22/2021
C2600 C2600 [Concreto] - 2 11/26/2021 11/27/2021 2 9/7/2021
C2601 C2601 [M. Tierras] - 4 11/5/2021 11/13/2021 4 8/22/2021
C2610 C2610 [Concreto] - 6 11/24/2021 11/29/2021 6 9/5/2021
C2620 C2620 [Concreto] - 4 11/30/2021 12/3/2021 4 9/11/2021
C2630 C2630 [Estructuras] 12 ### 11/22/2021 12 9/20/2021
C2640 C2640 [Eléctrica] - 1 11/23/2021 11/23/2021 1 10/2/2021
C2650 C2650 [Sanitaria] - 10 11/24/2021 12/3/2021 10 10/3/2021
C2660 C2660 [Eléctrica] - 15 11/24/2021 12/8/2021 15 10/3/2021
13. Módulo 13. Módulo I: ALMA 38 ### 11/26/2021 33 8/22/2021
C2700 C2700 [M. Tierras] - 6 11/5/2021 11/14/2021 6 8/22/2021
C2710 C2710 [Concreto] - 3 11/12/2021 11/14/2021 3 9/2/2021
C2720 C2720 [Concreto] - 10 ### 11/19/2021 10 8/28/2021
C2730 C2730 [Estructuras] 10 11/5/2021 11/19/2021 10 9/7/2021
C2740 C2740 [Sanitaria] - 7 11/20/2021 11/26/2021 7 9/17/2021
SECTOR 5 SECTOR 5 123 ### 2/3/2022 134 6/8/2021
Canal de Dren Canal de Drenaje Superf 100 ### 12/30/2021 130 6/8/2021
C6230 C6230 [M. Tierras] 15 11/16/2021 11/30/2021 100 6/8/2021
C6240 C6240 [M. Tierras] - 15 11/26/2021 12/10/2021 100 6/18/2021
C6250 C6250 [Concreto] - 15 12/6/2021 12/20/2021 100 6/28/2021
C6260 C6260 [Sanitaria] - 15 12/16/2021 12/30/2021 100 7/8/2021
C6270 C6270 [Carpintería] 100 ### 12/23/2021 100 7/8/2021
26.2 Cerco Pe 26.2 Cerco Perimétrico 50 ### 1/3/2022 66 8/12/2021
C6200 C6200 [M. Tierras] 20 12/12/2021 12/31/2021 50 8/12/2021
C6210 C6210 [Concreto] - 20 12/15/2021 1/3/2022 50 8/15/2021
C6220 C6220 [Estructuras] 50 ### 12/19/2021 50 8/28/2021
26.3 Cerco Pe 26.3 Cerco Perimétrico 55 ### 12/14/2021 36 7/13/2021
C6300 C6300 [M. Tierras] 30 11/12/2021 12/11/2021 30 7/13/2021
C6310 C6310 [Concreto] - 30 11/15/2021 12/14/2021 30 7/16/2021
C6320 C6320 [Estructuras] 30 ### 12/6/2021 30 7/19/2021
23. INSTALAC 23. INSTALACIONES E 99 ### 12/28/2021 124 6/18/2021
Banco de duc Banco de ductos 18 ### 11/14/2021 18 6/18/2021
C5000 C5000 [M. Tierras] 10 ### 11/14/2021 10 6/18/2021
C5020 C5020 [M. Tierras] 8 ### 11/13/2021 8 6/28/2021
23.1 Acometid 23.1 Acometida desd 62 ### 12/25/2021 74 8/7/2021
C5300 C5300 [M. Tierras] 10 ### 11/12/2021 10 8/7/2021
C5310 C5310 [Eléctrica] - 7 ### 11/15/2021 7 8/17/2021
C5320 C5320 [Eléctrica] - 7 ### 11/12/2021 7 8/20/2021
C5330 C5330 [Eléctrica] - 10 11/12/2021 11/21/2021 10 8/23/2021
C5340 C5340 [Eléctrica] - 20 12/6/2021 12/25/2021 20 9/21/2021
C5350 C5350 [M. Tierras] 4 ### 11/13/2021 4 9/2/2021
C5360 C5360 [Instrumentac 4 12/6/2021 12/9/2021 4 9/21/2021
C5370 C5370 [Instrumentac 5 ### 11/12/2021 5 9/25/2021
C5380 C5380 [Instrumentac 7 11/12/2021 11/18/2021 7 9/28/2021
C5390 C5390 [Instrumentac 15 11/19/2021 12/3/2021 15 10/5/2021
23.3 Red de D 23.3 Red de Distribu 77 ### 12/13/2021 92 7/16/2021
C5400 C5400 [M. Tierras] 40 ### 11/29/2021 40 7/16/2021
C5410 C5410 [Eléctrica] - 40 ### 12/13/2021 40 7/21/2021
C5420 C5420 [Concreto] - 40 ### 12/6/2021 40 8/30/2021
C5430 C5430 [M. Tierras] 40 ### 12/1/2021 40 9/6/2021
23.4 Buzones 23.4 Buzones Eléctric 20 ### 11/21/2021 20 7/18/2021
C5520 C5520 [Concreto] - 20 ### 11/21/2021 20 7/18/2021
23.5 Iluminac 23.5 Iluminación Exter 39 ### 12/28/2021 39 8/15/2021
C5600 C5600 [M. Tierras] - 15 ### 12/4/2021 15 8/15/2021
C5610 C5610 [Concreto] - 12 11/23/2021 12/4/2021 12 8/18/2021
C5620 C5620 [Eléctrica] - 14 11/27/2021 12/10/2021 14 8/22/2021
C5630 C5630 [Eléctrica] - 12 12/17/2021 12/28/2021 12 9/11/2021
22. SEÑALIZ 22. SEÑALIZACION IN 41 ### 12/6/2021 27 9/3/2021
C5800 C5800 [M. Tierras] 18 11/19/2021 12/6/2021 18 9/3/2021
C5810 C5810 [Concreto] - 18 11/19/2021 12/6/2021 18 9/3/2021
C5820 C5820 [Estructuras] 18 ### 11/29/2021 18 9/8/2021
C5830 C5830 [Señalización 18 11/12/2021 11/29/2021 18 9/12/2021
25. INSTRUME 25. INSTRUMENTACIÓN 95 ### 2/3/2022 87 7/16/2021
C5900 C5900 [M. Tierras] 25 11/12/2021 12/6/2021 25 7/16/2021
C5910 C5910 [Eléctrica] - 25 11/17/2021 12/11/2021 25 7/21/2021
C5920 C5920 [Concreto] - 25 12/12/2021 1/5/2022 25 8/15/2021
C5930 C5930 [M. Tierras] 25 12/19/2021 1/12/2022 25 8/22/2021
C5940 C5940 [Estructuras] 10 ### 11/20/2021 10 9/16/2021
C5950 C5950 [Instrumentac 15 ### 11/25/2021 15 9/26/2021
C5960 C5960 [Instrumentac 22 1/13/2022 2/3/2022 22 9/16/2021
DESMONTAJE DESMONTAJE DE ESTRU 100 ### 2/15/2022 74 7/8/2021
Desmontaje y Desmontaje y habilita 100 ### 2/15/2022 74 7/8/2021
C9500 C9500 Módulo C: Al 30 ### 07-10-21 17: 30 7/16/2021
C9510 C9510 Módulo G: Rev 30 9/6/2021 09-09-21 17: 30 7/8/2021
C9520 C9520 Modulo H: Al 30 ### 2/15/2022 30 8/21/2021
C9530 C9530 Módulo I: Alm 30 9/3/2021 2/15/2022 30 8/8/2021
C9540 C9540 Módulo L: Ram 30 1/17/2022 2/15/2022 30 8/19/2021
C9550 C9550 Módulo M: Alm 20 11/12/2021 12/1/2021 20 7/9/2021
C9560 C9560 Módulo N: Alm 20 ### 2/15/2022 20 7/16/2021
C9570 C9570 Módulo O Y P: 30 1/17/2022 2/15/2022 30 7/25/2021
C9580 C9580 Módulo R: Con 12 ### 11/23/2021 12 7/8/2021
27. PRECOMI 27. PRECOMISIONAMIEN 30 11/14/2021 12/13/2021 30 9/12/2021
C7000 C7000 Precomisiona 30 11/14/2021 12/13/2021 30 9/12/2021
28. COMISIO 28. COMISIONAMIENTO 12 2/4/2022 2/15/2022 12 10/20/2021
C8000 C8000 Comisionami 12 2/4/2022 2/15/2022 12 10/20/2021
C1010-SDC01 C1010 Trazo y repla 14 11/13/2021 11/26/2021 14 11/11/2021
Disciplina Civi Disciplina Civil 29 11/14/2021 12/12/2021 29 11/12/2021
Movimiento de Movimiento de Tierr 29 11/14/2021 12/12/2021 29 11/12/2021
C1020-SDC01 C1020 EXCAVACION 7 11/14/2021 11/20/2021 7 11/12/2021
C1030-SDC01 C1030 TRANSPORTE 1 11/19/2021 11/19/2021 1 11/17/2021
C1040-SDC01 C1040 TRANSPORTE 1 11/20/2021 11/20/2021 1 11/18/2021
C1050-SDC01 C1050 COLOCACION 2 11/21/2021 11/22/2021 2 11/19/2021
C1060-SDC01 C1060 REFINE, NIV 2 12/1/2021 12/2/2021 2 11/29/2021
C1070-SDC01 C1070 TRANSPORTE 1 11/19/2021 11/19/2021 1 11/17/2021
C1080-SDC01 C1080 TRANSPORTE D 3 11/20/2021 11/22/2021 3 11/18/2021
C1090-SDC01 C1090 RELLENO CON 3 12/3/2021 12/5/2021 3 12/1/2021
C1100-SDC01 C1100 RELLENO Y C 2 12/6/2021 12/7/2021 2 12/4/2021
C1110-SDC01 C1110 ELIMINACION 1 12/8/2021 12/8/2021 1 12/6/2021
C1120-SDC01 C1120 ELIMINACION 3 12/8/2021 12/10/2021 3 12/6/2021
C1130-SDC01 C1130 MEJORAMIEN 2 12/11/2021 12/12/2021 2 12/9/2021
C1140-SDC01 C1140 EXCAVACION 2 11/21/2021 11/22/2021 2 11/19/2021
Concreto sim Concreto simple par 1 11/23/2021 11/23/2021 1 11/21/2021
C1200-SDC01 C1200 COLOCACIÓN 1 11/23/2021 11/23/2021 1 11/21/2021
Concreto Ar Concreto Armado 16 11/24/2021 12/9/2021 16 11/22/2021
C1300-SDC01 C1300 COLOCACIÓN 2 12/8/2021 12/9/2021 2 12/6/2021
C1310-SDC01 C1310 ENCOFRADO 9 11/29/2021 12/7/2021 9 11/27/2021
C1320-SDC01 C1320 HABILITACIÓ 5 11/24/2021 11/28/2021 5 11/22/2021
Carpintería m Carpintería metálica 2 12/10/2021 12/11/2021 2 12/8/2021
C1400-SDC01 C1400 SUMINISTRO E 1 12/10/2021 12/10/2021 1 12/8/2021
C1410-SDC01 C1410 SUMINISTRO E 1 12/11/2021 12/11/2021 1 12/9/2021
Disciplina Ins Disciplina Instalaciones 34 11/23/2021 12/26/2021 34 11/21/2021
INSTALACIÓN INSTALACIÓN 975- 1 11/30/2021 11/30/2021 1 11/28/2021
C1600-SDC01 C1600 Pipe, PE D335 1 11/30/2021 11/30/2021 1 11/28/2021
INSTALACIÓN INSTALACIÓN 975- 7 11/23/2021 11/29/2021 7 11/21/2021
C1500-SDC01 C1500 Pipe, PE D335 7 11/23/2021 11/29/2021 7 11/21/2021
INSTALACIÓN INSTALACIÓN 975- 1 11/30/2021 11/30/2021 1 11/28/2021
C1700-SDC01 C1700 Pipe, PE D335 1 11/30/2021 11/30/2021 1 11/28/2021
Conexionado Conexionado de tuber 14 12/13/2021 12/26/2021 14 12/11/2021
C1800-SDC01 C1800 CONEXIONADO 14 12/13/2021 12/26/2021 14 12/11/2021
Retiro de Tub Retiro de Tubería de 2 23 44477.2917 11/8/2021 22 10/8/2021
SDC061200 SDC0612 Inicio de IDT 0 44477.2917 0 10/8/2021
SDC061210 SDC0612 Fin de IDT N° 0 06-11-21 17: 0
Obras Prelimi Obras Preliminares 15 44477.2917 11/5/2021 15 10/8/2021
SDC061000 SDC061 Señalización 15 44477.2917 11/5/2021 15 10/8/2021
SDC061010 SDC061 Trazo y repla 15 44477.2917 21-10-21 17: 15 10/8/2021
Retiro de Tub Retiro de Tubería de 20 12 44478.2917 14-10-21 17: 12 10/9/2021
SDC061020 SDC061 Excavacion c 2 44478.2917 10-10-21 17: 2 10/9/2021
SDC061030 SDC061 Corte de tube 1 44480.2917 11-10-21 17: 1 10/11/2021
SDC061040 SDC061 Corte de tuber 1 44482.2917 13-10-21 17: 1 10/13/2021
SDC061060 SDC061 Sellado de tub 1 44482.2917 13-10-21 17: 1 10/14/2021
SDC061070 SDC061 Sellado de tub 1 44481.2917 12-10-21 17: 1 10/12/2021
SDC061080 SDC061 Transporte de 5 44478.2917 13-10-21 17: 5 10/9/2021
SDC061090 SDC061 Transporte de 5 44478.2917 13-10-21 17: 5 10/9/2021
SDC061100 SDC061 Relleno con m 6 44483.2917 14-10-21 17: 6 10/15/2021
Culminar Pla Culminar Plataformado 9 44482.2917 11/8/2021 16 10/14/2021
SDC061110 SDC061 Excavacion c 5 44482.2917 11/7/2021 5 10/21/2021
SDC061120 SDC061 Eliminacion d 2 44482.2917 11/6/2021 2 10/28/2021
SDC061130 SDC061 Eliminacion d 2 44482.2917 11/5/2021 2 10/26/2021
SDC061140 SDC061 Transporte de 4 44482.2917 11/8/2021 4 10/14/2021
SDC061150 SDC061 Transporte de 4 44483.2917 11/8/2021 4 10/14/2021
SDC061160 SDC061 Relleno con m 3 44483.2917 11/6/2021 3 10/18/2021
SDC061170 SDC061 Transporte de 2 44483.2917 11/6/2021 2 10/18/2021
SDC061180 SDC061 Transporte de 2 44483.2917 11/6/2021 2 10/18/2021
SDC061190 SDC061 Relleno con m 2 44483.2917 11/6/2021 2 10/21/2021
Construcción Construcción de dren pa 28 44428.2917 16-09-21 18: 28 8/20/2021
C2190-SDC06 C2190-S Trazo y Repla 1 44428.2917 20-08-21 18: 1 8/20/2021
C2191-SDC06 C2191-S Control Topog 27 44429.2917 16-09-21 18: 27 8/21/2021
C2200-SDC06 C2200-S Excavación c 3 44429.2917 23-08-21 18: 3 8/21/2021
C2210-SDC06 C2210-S Eliminación d 2 44432.2917 25-08-21 18: 2 8/24/2021
C2220-SDC06 C2220-S Carguío y tra 10 44432.2917 02-09-21 18: 10 8/24/2021
C2221-SDC06 C2221-S Carguío y tra 1 44432.2917 24-08-21 18: 1 8/24/2021
C2230-SDC06 C2230-S Drenaje de ag 7 44430.2917 28-08-21 18: 7 8/22/2021
C2240-SDC06 C2240-S Perfilado de 4 44437.2917 01-09-21 18: 4 8/29/2021
C2250-SDC06 C2250-S Colocación de 2 44440.2917 02-09-21 18: 2 9/1/2021
C2260-SDC06 C2260-S Colocación d 2 44440.2917 02-09-21 18: 2 9/1/2021
C2270-SDC06 C2270-S Trabajos de t 2 44440.2917 02-09-21 18: 2 9/1/2021
C2280-SDC06 C2280-S Colocación de 2 44440.2917 02-09-21 18: 2 9/1/2021
C2290-SDC06 C2290-S Relleno con m 2 44440.2917 02-09-21 18: 2 9/1/2021
Implementació Implementación de Micr 128 44440.2917 1/6/2022 117 9/1/2021
Sector 1 Sector 1 118 44440.2917 12/27/2021 107 9/1/2021
A1000 A1000 Microclima M 43 44440.2917 11/19/2021 43 9/1/2021
A1010 A1010 Microclima M 8 12/20/2021 12/27/2021 8 12/9/2021
A1020 A1020 Microclima M 3 12/22/2021 12/24/2021 3 12/11/2021
A1030 A1030 Microclima M 42 44440.2917 11/5/2021 42 9/1/2021
Sector 2 Sector 2 94 44440.2917 11/12/2021 94 9/1/2021
A1040 A1040 Microclima M 4 15-10-21 17: 11/8/2021 4 11/1/2021
A1050 A1050 Microclima M 94 44440.2917 11/12/2021 94 9/1/2021
Sector 3 Sector 3 102 44440.2917 11/22/2021 98 9/1/2021
A1060 A1060 Microclima M 39 44440.2917 44497 39 9/1/2021
A1070 A1070 Microclima 3 44491.2917 11/7/2021 3 11/26/2021
A1080 A1080 Microclima M 3 11/20/2021 11/22/2021 3 11/30/2021
A1090 A1090 Microclima M 38 44440.2917 11/5/2021 38 9/1/2021
A1100 A1100 Microclima M 3 11/7/2021 11/9/2021 3 11/2/2021
A1110 A1110 Microclima M 15 11/5/2021 11/19/2021 15 11/23/2021
A1120 A1120 Microclima M 67 44440.2917 11/5/2021 65 9/1/2021
Sector 4 Sector 4 83 44440.2917 11/22/2021 95 9/1/2021
A1130 A1130 Microclima M 73 44440.2917 11/5/2021 73 9/1/2021
A1140 A1140 Microclima M 39 44440.2917 11/6/2021 39 9/1/2021
A1150 A1150 Microclima M 6 11/11/2021 11/16/2021 6 11/12/2021
A1160 A1160 Microclima M 6 11/17/2021 11/22/2021 6 11/20/2021
A1170 A1170 Microclima M 6 11/15/2021 11/20/2021 6 11/29/2021
Sector 5 Sector 5 128 44440.2917 1/6/2022 117 9/1/2021
A1180 A1180 Redes eléctri 105 44440.2917 11/20/2021 105 9/1/2021
A1200 A1200 Canaleta peri 4 1/3/2022 1/6/2022 4 12/19/2021
A1230 A1230 Cerco Perimét 25 11/30/2021 12/24/2021 25 12/1/2021
A1240 A1240 Cerco Perimét 15 11/15/2021 11/29/2021 41 11/16/2021
Perfilado en e Perfilado en el talud sur 14 44491.2917 11/5/2021 12 10/8/2021
A1210 A1210 Entrega de ID 0 05-11-21 07:00* 0 10/8/2021
A1220 A1220 Trabajos en t 12 44491.2917 28-10-21 17: 12 10/8/2021
27. PRECOMI 27. PRECOMISIONAMIEN 30 11/5/2021 12/4/2021 30 11/16/2021
C7000 C7000 Precomisiona 30 11/5/2021 12/4/2021 30 11/16/2021
28. COMISIO 28. COMISIONAMIENTO 5 1/10/2022 1/14/2022 5 12/26/2021
C8000 C8000 Comisionami 5 1/10/2022 1/14/2022 5 12/26/2021
BL Project FinVariance - BLBudgeted LabActual Labor Remaining LaSchedule % CPerformancePerformance
10/31/2021 -107 109876 34132 75641 0% 31% 31.06%
10/31/2021 -107 0 0 0 0% 0% 0%
10/31/2021 -107 0 0 0 0% 0% 0%
0 0 0 0 100% 0% 0%
0 0 0 0 100% 0% 0%
10/31/2021 -107 0 0 0 100% 0% 0%
10/31/2021 -107 0 0 0 0% 0% 0%
0 0 0 0 100% 0% 0%
0 0 0 0 100% 0% 0%
38 0 0 0 100% 0% 0%
38 0 0 0 100% 0% 0%
0 0 0 0 100% 0% 0%
10/19/2021 -107 0 0 0 100% 0% 0%
10/31/2021 -107 0 0 0 100% 0% 0%
3/17/2021 0 0 0 0 0% 0% 0%
0 0 0 0 100% 0% 0%
0 0 0 0 100% 0% 0%
0 0 0 0 100% 0% 0%
0 0 0 0 100% 0% 0%
0 0 0 0 100% 0% 0%
10/2/2021 -137 0 0 0 0% 0% 0%
8/26/2021 -93 0 0 0 0% 0% 0%
-113 0 0 0 100% 0% 0%
-93 0 0 0 100% 0% 0%
-113 0 0 0 100% 0% 0%
-93 0 0 0 100% 0% 0%
-113 0 0 0 100% 0% 0%
-93 0 0 0 100% 0% 0%
-108 0 0 0 100% 0% 0%
-93 0 0 0 100% 0% 0%
8/15/2021 -89 0 0 0 0% 0% 0%
-119 0 0 0 100% 0% 0%
-89 0 0 0 100% 0% 0%
8/27/2021 -77 0 0 0 0% 0% 0%
-107 0 0 0 100% 0% 0%
-77 0 0 0 100% 0% 0%
-107 0 0 0 100% 0% 0%
-77 0 0 0 100% 0% 0%
-107 0 0 0 100% 0% 0%
-77 0 0 0 100% 0% 0%
-107 0 0 0 100% 0% 0%
-77 0 0 0 100% 0% 0%
-107 0 0 0 100% 0% 0%
-77 0 0 0 100% 0% 0%
-107 0 0 0 100% 0% 0%
-77 0 0 0 100% 0% 0%
-107 0 0 0 100% 0% 0%
-77 0 0 0 100% 0% 0%
-107 0 0 0 100% 0% 0%
-77 0 0 0 100% 0% 0%
10/2/2021 -41 0 0 0 0% 0% 0%
-56 0 0 0 100% 0% 0%
-41 0 0 0 100% 0% 0%
-56 0 0 0 100% 0% 0%
-41 0 0 0 100% 0% 0%
-56 0 0 0 100% 0% 0%
-41 0 0 0 100% 0% 0%
-56 0 0 0 100% 0% 0%
-41 0 0 0 100% 0% 0%
9/21/2021 -69 0 0 0 0% 0% 0%
-82 0 0 0 100% 0% 0%
-69 0 0 0 100% 0% 0%
-82 0 0 0 100% 0% 0%
-69 0 0 0 100% 0% 0%
9/27/2021 -52 0 0 0 0% 0% 0%
-61 0 0 0 100% 0% 0%
-52 0 0 0 100% 0% 0%
8/31/2021 -85 0 0 0 0% 0% 0%
-103 0 0 0 100% 0% 0%
-85 0 0 0 100% 0% 0%
-88 0 0 0 100% 0% 0%
-85 0 0 0 100% 0% 0%
-103 0 0 0 100% 0% 0%
-85 0 0 0 100% 0% 0%
8/20/2021 -103 0 0 0 0% 0% 0%
-99 0 0 0 100% 0% 0%
-103 0 0 0 100% 0% 0%
9/22/2021 -66 0 0 0 0% 0% 0%
-66 0 0 0 100% 0% 0%
-66 0 0 0 100% 0% 0%
-66 0 0 0 100% 0% 0%
-66 0 0 0 100% 0% 0%
-66 0 0 0 100% 0% 0%
-66 0 0 0 100% 0% 0%
7/15/2021 -127 0 0 0 0% 0% 0%
-150 0 0 0 100% 0% 0%
-127 0 0 0 100% 0% 0%
8/17/2021 -104 0 0 0 0% 0% 0%
-124 0 0 0 100% 0% 0%
-104 0 0 0 100% 0% 0%
-124 0 0 0 100% 0% 0%
-104 0 0 0 100% 0% 0%
-107 0 0 0 100% 0% 0%
-104 0 0 0 100% 0% 0%
8/31/2021 -82 0 0 0 0% 0% 0%
-103 0 0 0 100% 0% 0%
-82 0 0 0 100% 0% 0%
-103 0 0 0 100% 0% 0%
-82 0 0 0 100% 0% 0%
-80 0 0 0 100% 0% 0%
-82 0 0 0 100% 0% 0%
-103 0 0 0 100% 0% 0%
-82 0 0 0 100% 0% 0%
9/21/2021 -148 0 0 0 0% 0% 0%
-82 0 0 0 100% 0% 0%
-119 0 0 0 100% 0% 0%
-72 0 0 0 100% 0% 0%
-148 0 0 0 100% 0% 0%
-72 0 0 0 100% 0% 0%
-148 0 0 0 100% 0% 0%
-72 0 0 0 100% 0% 0%
-148 0 0 0 100% 0% 0%
-89 0 0 0 100% 0% 0%
-85 0 0 0 100% 0% 0%
6/14/2021 0 0 0 0 0% 0% 0%
6/10/2021 0 0 0 0 0% 0% 0%
4/29/2021 0 0 0 0 100% 0% 0%
4/26/2021 0 0 0 0 100% 0% 0%
4/26/2021 0 0 0 0 100% 0% 0%
3/16/2021 0 0 0 0 100% 0% 0%
6/10/2021 0 0 0 0 100% 0% 0%
4/24/2021 0 0 0 0 0% 0% 0%
4/24/2021 0 0 0 0 100% 0% 0%
6/14/2021 0 0 0 0 0% 0% 0%
4/30/2021 0 0 0 0 100% 0% 0%
5/5/2021 0 0 0 0 100% 0% 0%
6/14/2021 0 0 0 0 100% 0% 0%
5/22/2021 0 0 0 0 0% 0% 0%
5/22/2021 0 0 0 0 100% 0% 0%
5/22/2021 0 0 0 0 100% 0% 0%
5/18/2021 0 0 0 0 0% 0% 0%
5/11/2021 0 0 0 0 100% 0% 0%
5/16/2021 0 0 0 0 100% 0% 0%
5/18/2021 0 0 0 0 100% 0% 0%
10/19/2021 -119 108336 34132 74101 0% 32% 32%
9/18/2021 -106 19011 6251 12760 0% 33% 32.88%
6/7/2021 -161 1497 958 539 0% 64% 63.99%
6/7/2021 -161 1497 958 539 100% 64% 63.99%
8/1/2021 -123 3638 1489 2149 0% 41% 40.92%
6/27/2021 -142 1900 1368 532 100% 72% 72.00%
8/1/2021 -123 1738 121 1617 100% 6.95% 6.95%
9/18/2021 -74 8227 3467 4760 0% 42% 42.14%
6/8/2021 -12 25 25 0 100% 100% 100%
6/20/2021 -84 457 457 0 100% 100% 100%
6/27/2021 -142 888 239 649 100% 26.94% 26.94%
7/2/2021 -117 123 123 0 100% 100.00% 100%
7/3/2021 -132 22 0 22 100% 0.50% 1%
7/27/2021 -127 1876 340 1536 100% 18.12% 18.12%
8/31/2021 -74 2380 1929 451 100% 81.05% 81.05%
9/5/2021 -77 295 0 295 100% 0% 0%
9/12/2021 -77 308 0 308 100% 0% 0%
9/17/2021 -57 589 354 235 100% 60.10% 60.10%
9/18/2021 -74 1264 0 1264 100% 0% 0%
8/28/2021 -127 5176 309 4867 0% 6% 6%
6/27/2021 -161 230 0 230 100% 0% 0%
7/12/2021 -127 1045 274 771 100% 26% 26.19%
7/19/2021 -127 41 0 41 100% 0% 0%
7/31/2021 -127 641 0 641 100% 0% 0%
8/26/2021 -127 3123 0 3123 100% 0% 0%
8/28/2021 -127 96 35 61 100% 36.46% 36.46%
8/26/2021 -109 473 28 445 0% 6% 5.92%
8/8/2021 -127 33 0 33 100% 0% 0%
8/19/2021 -88 200 28 172 100% 14.00% 14%
8/20/2021 -89 62 0 62 100% 0% 0%
8/26/2021 -89 178 0 178 100% 0% 0%
10/11/2021 -66 13048 4198 8881 0% 32% 32.17%
6/17/2021 -152 1130 710 420 0% 63% 63%
6/17/2021 -152 1130 710 420 100% 62.74% 62.74%
8/6/2021 -119 3208 1312 1896 0% 41% 40.92%
7/7/2021 -130 1675 1206 469 100% 72.02% 72.02%
8/6/2021 -119 1533 106 1427 100% 6.93% 6.93%
10/11/2021 -63 2346 402 1944 0% 17.12% 17.12%
8/8/2021 -102 106 88 18 100% 83% 83%
8/16/2021 -95 672 176 496 100% 26% 26.19%
8/21/2021 -47 42 42 0 100% 100% 100%
8/28/2021 -82 422 7 415 100% 2% 1.66%
9/14/2021 -82 398 0 398 100% 0% 0.00%
9/16/2021 -63 375 89 286 100% 24% 23.67%
9/24/2021 -63 32 0 32 100% 0% 0.00%
10/11/2021 -63 299 0 299 100% 0.00% 0.00%
9/14/2021 -93 6364 1774 4620 0% 27.88% 27.88%
6/27/2021 -141 480 476 4 100% 99% 99.16%
7/4/2021 -134 572 154 418 100% 26.94% 26.94%
7/1/2021 -133 84 84 0 100% 100% 100.00%
7/21/2021 -133 1890 71 1819 100% 4% 4%
9/4/2021 -93 42 0 42 100% 0.00% 0.00%
8/30/2021 -93 234 0 234 100% 0% 0%
8/25/2021 -93 1907 990 948 100% 51.89% 51.89%
9/4/2021 -93 167 0 167 100% 0% 0%
9/8/2021 -93 253 0 253 100% 0% 0%
9/14/2021 -93 735 0 735 100% 0% 0.00%
10/18/2021 -73 26205 9454 16751 0% 36.07% 36.07%
10/18/2021 -66 16740 7005 9735 0% 41.84% 41.84%
7/14/2021 -138 2019 1324 695 0% 65.58% 65.58%
6/29/2021 -138 1958 1324 634 100% 67.62% 67.62%
7/14/2021 -138 61 0 61 100% 0% 0%
8/29/2021 -94 5470 2238 3232 0% 41% 41%
8/3/2021 -110 2857 2057 800 100% 72.00% 72.00%
8/29/2021 -94 2613 181 2432 100% 7% 7%
10/18/2021 -66 5518 2411 3107 0% 44% 44%
7/27/2021 -37 257 257 0 100% 100% 100%
8/3/2021 -103 691 94 597 100% 14% 13.55%
8/7/2021 -97 312 231 81 100% 74% 73.84%
8/23/2021 -83 1271 1059 212 100% 83% 83.30%
9/26/2021 -66 1923 671 1252 100% 35% 34.90%
9/30/2021 -66 186 0 186 100% 0% 0%
10/10/2021 -39 137 50 87 100% 37% 36.50%
10/10/2021 -37 111 49 62 100% 44.14% 44.14%
10/18/2021 -66 630 0 630 100% 0.00% 0%
8/4/2021 -126 1051 251 800 0% 24% 23.85%
7/13/2021 -128 691 94 597 100% 14% 14%
7/20/2021 -121 239 157 82 100% 66% 65.72%
7/24/2021 -121 36 0 36 100% 0% 0.00%
8/4/2021 -126 85 0 85 100% 0.00% 0.00%
8/11/2021 -107 213 27 186 0% 13% 12.59%
7/28/2021 -121 67 0 67 100% 0% 0%
8/11/2021 -97 146 27 119 100% 18.37% 18.37%
9/8/2021 -104 2069 720 1349 0% 34.79% 34.79%
7/2/2021 -57 161 161 0 100% 100% 100%
7/17/2021 -122 265 247 18 100% 93% 93.21%
7/24/2021 -40 16 16 0 100% 100% 100.00%
7/31/2021 -110 691 94 597 100% 14% 13.55%
8/4/2021 -101 239 157 82 100% 66% 66%
8/9/2021 -104 45 0 45 100% 0% 0%
8/21/2021 -104 240 0 240 100% 0% 0.00%
8/25/2021 -104 1 0 1 100% 0% 0%
9/1/2021 -76 119 45 74 100% 37.82% 37.82%
9/8/2021 -104 292 0 292 100% 0% 0.00%
8/3/2021 -127 400 34 366 0% 9% 9%
7/6/2021 -58 8 8 0 100% 100% 100.00%
7/12/2021 -123 37 26 11 100% 70% 70%
7/22/2021 -127 248 0 248 100% 0% 0.00%
8/3/2021 -127 107 0 107 100% 0.00% 0.00%
9/27/2021 -94 9465 2449 7016 0% 26% 26%
9/27/2021 -94 8681 1810 6871 0% 21% 21%
7/18/2021 -122 471 0 471 100% 0% 0%
8/14/2021 -103 3016 960 2056 100% 31.83% 31.83%
9/3/2021 -86 3071 472 2599 100% 15% 15%
9/17/2021 -63 747 126 621 100% 17% 16.89%
9/27/2021 -51 773 245 528 100% 32% 32%
9/3/2021 -103 56 0 56 100% 0% 0.00%
9/18/2021 -103 272 0 272 100% 0% 0%
7/23/2021 -122 51 0 51 100% 0% 0%
9/7/2021 -69 224 7 217 100% 3% 3.11%
9/8/2021 -94 784 639 145 0% 82% 81.50%
7/12/2021 -87 83 83 0 100% 100% 100%
8/1/2021 -107 560 522 38 100% 93% 93.21%
8/9/2021 -59 34 34 0 100% 100.00% 100.00%
8/14/2021 -94 10 0 10 100% 0.00% 0.00%
8/21/2021 -94 68 0 68 100% 0.00% 0.00%
9/3/2021 -94 16 0 16 100% 0% 0%
9/8/2021 -94 13 0 13 100% 0% 0%
10/18/2021 -63 20021 8376 11571 0% 42% 42%
7/16/2021 -122 1138 748 390 0% 66% 65.72%
7/16/2021 -122 1138 748 390 100% 66% 65.72%
9/19/2021 -70 1666 682 984 0% 41% 41%
9/19/2021 -70 1666 682 984 100% 41% 40.90%
9/28/2021 -75 1898 1570 322 0% 82.69% 83%
8/20/2021 -85 82 79 3 100% 96% 96%
7/23/2021 -112 212 206 0 100% 97% 97%
8/12/2021 -94 1408 1271 137 100% 90% 90%
8/25/2021 -85 15 0 15 100% 0% 0%
9/1/2021 -85 108 0 108 100% 0% 0.00%
9/8/2021 -85 30 0 30 100% 0% 0%
9/18/2021 -85 16 0 16 100% 0% 0%
9/28/2021 -47 27 14 13 100% 50% 50.00%
10/18/2021 -41 5484 2229 3255 0% 40.64% 40.64%
8/13/2021 -20 148 148 0 100% 100% 100.00%
7/31/2021 -108 595 397 198 100% 66.72% 66.72%
8/23/2021 -88 919 125 794 100% 14% 14%
8/30/2021 -77 236 131 105 100% 55.51% 55.51%
9/17/2021 -69 2568 579 1989 100% 23% 23%
10/6/2021 -37 764 746 18 100% 98% 98%
10/10/2021 -37 58 0 58 100% 0% 0%
10/17/2021 -27 172 103 69 100% 60% 60%
10/18/2021 -41 24 0 24 100% 0.00% 0.00%
10/12/2021 -69 4030 2192 1770 0% 54% 54.38%
8/16/2021 -17 290 290 0 100% 100% 100%
8/4/2021 -101 200 132 0 100% 66% 66%
8/21/2021 -82 214 214 0 100% 100% 100%
9/5/2021 -78 1234 223 1011 100% 18.04% 18.04%
9/25/2021 -50 1523 1333 190 100% 87.52% 87.52%
10/5/2021 -50 145 0 145 100% 0% 0%
9/27/2021 -69 81 0 81 100% 0% 0%
10/12/2021 -69 343 0 343 100% 0% 0%
9/11/2021 -93 2697 697 2000 0% 26% 25.87%
8/5/2021 -100 17 5 12 100% 29% 29%
7/31/2021 -103 47 47 0 100% 100% 100%
8/6/2021 -99 549 369 180 100% 67.30% 67.34%
8/26/2021 -93 1409 276 1133 100% 20% 19.59%
9/5/2021 -93 136 0 136 100% 0% 0%
9/11/2021 -93 539 0 539 100% 0% 0%
10/17/2021 -52 1919 39 1880 0% 2% 2.05%
9/8/2021 -80 23 0 23 100% 0% 0%
8/25/2021 -80 33 20 13 100% 62% 62%
9/10/2021 -80 327 0 327 100% 0% 0%
9/14/2021 -80 35 0 35 100% 0% 0%
10/1/2021 -52 874 19 855 100% 2% 2.17%
10/2/2021 -52 50 0 50 100% 0% 0%
10/12/2021 -52 97 0 97 100% 0% 0%
10/17/2021 -52 480 0 480 100% 0% 0%
9/23/2021 -64 1189 220 969 0% 18% 18.46%
8/27/2021 -79 55 38 17 100% 69% 69%
9/4/2021 -71 44 0 44 100% 0% 0%
9/6/2021 -74 363 56 307 100% 15.43% 15.43%
9/16/2021 -64 619 126 493 100% 20% 20%
9/23/2021 -64 108 0 108 100% 0% 0%
10/19/2021 -107 28362 5239 23064 0% 18% 18.47%
10/15/2021 -76 5968 998 4970 0% 17% 16.71%
9/15/2021 -76 638 0 638 100% 0% 0%
9/25/2021 -76 234 0 234 100% 0% 0%
10/5/2021 -76 2933 0 2933 100% 0% 0%
10/15/2021 -76 209 0 209 100% 0% 0%
10/15/2021 -69 1954 998 956 100% 51.05% 51.05%
10/16/2021 -79 2619 227 2392 0% 9% 8.65%
9/30/2021 -92 67 0 67 100% 0% 0%
10/3/2021 -92 94 0 94 100% 0% 0%
10/16/2021 -64 2458 227 2231 100% 9.22% 9.22%
8/17/2021 -119 2619 227 2392 0% 9% 8.65%
8/11/2021 -122 67 0 67 100% 0% 0%
8/14/2021 -122 94 0 94 100% 0% 0%
8/17/2021 -111 2458 227 2231 100% 9% 9.22%
10/19/2021 -70 12171 3780 8332 0% 31% 31.06%
7/5/2021 -132 162 125 37 0% 77% 77.16%
6/27/2021 -140 114 88 26 100% 77% 77.19%
7/5/2021 -131 48 37 11 100% 77% 77.08%
10/19/2021 -67 2582 1178 1345 0% 46% 45.62%
8/16/2021 -88 587 528 0 100% 86.59% 87%
8/23/2021 -84 379 157 222 100% 41.32% 41.32%
8/26/2021 -78 182 156 26 100% 96.60% 97%
9/1/2021 -81 58 0 58 100% 0% 0%
10/10/2021 -76 672 0 672 100% 0% 0%
9/5/2021 -69 293 249 44 100% 85% 85.14%
9/24/2021 -76 86 0 86 100% 0% 0%
9/29/2021 -44 91 88 3 100% 96.35% 96.35%
10/4/2021 -45 13 0 13 100% 0% 0%
10/19/2021 -45 221 0 221 100% 0% 0%
10/15/2021 -59 5321 1783 3538 0% 34% 33.51%
8/24/2021 -97 706 393 313 100% 55.70% 55.70%
8/29/2021 -106 2623 548 2075 100% 20.91% 20.91%
10/8/2021 -59 932 319 613 100% 34.23% 34.23%
10/15/2021 -47 1060 523 537 100% 49.30% 49.30%
8/6/2021 -107 1542 679 863 0% 44% 44.06%
8/6/2021 -107 1542 679 863 100% 44.06% 44.06%
9/22/2021 -97 2564 15 2549 0% 1% 0.58%
8/29/2021 -97 217 15 202 100% 7% 6.88%
8/29/2021 -97 208 0 208 100% 0% 0%
9/4/2021 -97 1299 0 1299 100% 0% 0%
9/22/2021 -97 840 0 840 100% 0% 0%
9/29/2021 -68 654 2 652 0% 0% 0.31%
9/20/2021 -77 133 0 133 100% 0% 0%
9/20/2021 -77 93 0 93 100% 0% 0%
9/25/2021 -65 124 2 122 100% 1.63% 1.63%
9/29/2021 -61 304 0 304 100% 0% 0%
10/10/2021 -116 4331 5 4326 0% 0% 0.11%
8/9/2021 -119 76 0 76 100% 0% 0%
8/14/2021 -119 3367 0 3367 100% 0% 0%
9/8/2021 -119 485 0 485 100% 0% 0%
9/15/2021 -119 90 0 90 100% 0% 0%
9/25/2021 -56 56 2 54 100% 4% 3.57%
10/10/2021 -46 174 3 171 100% 1.71% 1.71%
10/7/2021 -119 83 0 83 100% 0% 0%
9/19/2021 -149 1689 614 1075 0% 36% 36.35%
9/19/2021 -149 1689 614 1075 0% 36% 36.35%
8/14/2021 -54 32 32 0 100% 100% 100%
8/6/2021 -34 426 426 0 100% 100% 100%
9/19/2021 -149 353 0 353 100% 0% 0.00%
9/6/2021 -162 193 156 37 100% 80.83% 81%
9/17/2021 -151 97 0 97 100% 0% 0%
7/28/2021 -126 104 0 104 100% 0% 0%
8/4/2021 -195 18 0 18 100% 0.00% 0%
8/23/2021 -176 313 0 313 100% 0.00% 0%
7/19/2021 -127 153 0 153 100% 0% 0.00%
10/11/2021 -63 770 0 770 0% 0% 0%
10/11/2021 -63 770 0 770 100% 0% 0%
10/31/2021 -107 770 0 770 0% 0% 0%
10/31/2021 -107 770 0 770 100% 0% 0%
11/24/2021 -2 600 600 0 0 60000% 0%
12/10/2021 -2 1550 1550 0 0 155000% 0%
12/10/2021 -2 1151 1151 0 0 115100% 0%
11/18/2021 -2 393 393 0 0 39300% 0%
11/17/2021 -2 4 4 0 0 400% 0%
11/18/2021 -2 6 6 0 0 600% 0%
11/20/2021 -2 83 83 0 0 8300% 0%
11/30/2021 -2 89 89 0 0 8900% 0%
11/17/2021 -2 18 18 0 0 1800% 0%
11/20/2021 -2 30 30 0 0 3000% 0%
12/3/2021 -2 210 210 0 0 21000% 0%
12/5/2021 -2 120 120 0 0 12000% 0%
12/6/2021 -2 16 16 0 0 1600% 0%
12/8/2021 -2 60 60 0 0 6000% 0%
12/10/2021 -2 39 39 0 0 3900% 0%
11/20/2021 -2 83 83 0 0 8300% 0%
11/21/2021 -2 5 5 0 0 500% 0%
11/21/2021 -2 5 5 0 0 500% 0%
12/7/2021 -2 353 353 0 0 35300% 0%
12/7/2021 -2 71 71 0 0 7100% 0%
12/5/2021 -2 177 177 0 0 17700% 0%
11/26/2021 -2 105 105 0 0 10500% 0%
12/9/2021 -2 41 41 0 0 4100% 0%
12/8/2021 -2 27 27 0 0 2700% 0%
12/9/2021 -2 14 14 0 0 1400% 0%
12/24/2021 -2 803 284 0 0 28400% 0%
11/28/2021 -2 6 6 0 0 600% 0%
11/28/2021 -2 6 6 0 0 600% 0%
11/27/2021 -2 183 183 0 0 18300% 0%
11/27/2021 -2 183 183 0 0 18300% 0%
11/28/2021 -2 29 29 0 0 2900% 0%
11/28/2021 -2 29 29 0 0 2900% 0%
12/24/2021 -2 585 66 0 0 6600% 0%
12/24/2021 -2 585 66 0 0 6600% 0%
10/29/2021 -10 5056 5056 4473 4473 58300% 0.00%
0 0 0 0 0 0% 100%
10/29/2021 -8 0 0 0 0 0% 100%
10/22/2021 -13 1350 1350 1350 1350 0% 0%
10/22/2021 -13 750 750 750 750 0% 100%
10/22/2021 1 600 600 600 600 0% 100%
10/20/2021 6 789 789 789 789 0% 0%
10/10/2021 0 245 245 245 245 0% 100%
10/11/2021 0 22 22 22 22 0% 100%
10/13/2021 0 25 25 25 25 0% 100%
10/14/2021 1 11 11 11 11 0% 100%
10/12/2021 0 11 11 11 11 0% 100%
10/13/2021 0 34 34 34 34 0% 100%
10/13/2021 0 54 54 54 54 0% 100%
10/20/2021 6 387 387 387 387 0% 100%
10/29/2021 -10 2917 2917 2334 2334 58300% 0%
10/25/2021 -13 1064 1064 851 851 21300% 100%
10/29/2021 -8 127 127 102 102 2500% 100%
10/27/2021 -9 104 104 83 83 2100% 100%
10/17/2021 -22 107 107 86 86 2100% 100%
10/17/2021 -22 180 180 144 144 3600% 100%
10/20/2021 -17 1166 1166 933 933 23300% 100%
10/19/2021 -18 12 12 10 10 200% 100%
10/19/2021 -18 19 19 15 15 400% 100%
10/22/2021 -15 138 138 110 110 2800% 100%
9/16/2021 0 3644 3644 3644 3644 0% 0%
8/20/2021 0 750 750 750 750 0% 100%
9/16/2021 0 600 600 600 600 0% 100%
8/23/2021 0 675 675 675 675 0% 100%
8/25/2021 0 147 147 147 147 0% 100%
9/2/2021 0 130 130 130 130 0% 100%
8/24/2021 0 5 5 5 5 0% 100%
8/28/2021 0 182 182 182 182 0% 100%
9/1/2021 0 84 84 84 84 0% 100%
9/2/2021 0 251 251 251 251 0% 100%
9/2/2021 0 36 36 36 36 0% 100%
9/2/2021 0 250 250 250 250 0% 100%
9/2/2021 0 400 400 400 400 0% 100%
9/2/2021 0 134 134 134 134 0% 100%
12/26/2021 -11 9030 9030 2276 2276 627400% 0.00%
12/16/2021 -11 1640 1640 360 360 80000% 0.00%
10/13/2021 -36 600 600 180 180 30000% 100.00%
12/16/2021 -11 320 320 0 0 32000% 0%
12/13/2021 -11 120 120 0 0 12000% 0%
10/12/2021 -24 600 600 180 180 6000% 100.00%
12/3/2021 21 760 760 244 244 51600% 0.00%
11/4/2021 -4 160 160 64 64 9600% 100%
12/3/2021 21 600 600 180 180 42000.00% 70%
12/7/2021 15 2200 2200 1200 1200 100000% 0.00%
10/9/2021 -19 600 600 600 600 0% 100%
11/28/2021 21 120 120 8 8 11200% 0%
12/2/2021 10 120 120 0 0 12000% 0%
10/8/2021 -28 320 320 304 304 1600% 100%
11/4/2021 -5 120 120 0 0 12000% 100%
12/7/2021 18 600 600 0 0 60000% 0%
11/4/2021 -1 320 320 288 288 3200% 100%
12/4/2021 12 1280 1280 392 392 88800% 0.00%
11/12/2021 7 320 320 224 224 9600.00% 89%
10/9/2021 -28 240 240 168 168 7200% 100%
11/17/2021 1 240 240 0 0 24000% 0%
11/25/2021 3 240 240 0 0 24000% 0%
12/4/2021 14 240 240 0 0 24000% 0%
12/26/2021 -11 3150 3150 80 80 307000% 0.00%
12/14/2021 24 800 800 80 80 72000.00% 62%
12/22/2021 -15 750 750 0 0 75000% 0%
12/25/2021 1 800 800 0 0 80000% 0%
12/26/2021 27 800 800 0 0 80000% 0%
10/19/2021 -16 600 600 600 600 0% 0%
-28 0 0 0 0 0% 100%
10/19/2021 -9 600 600 600 600 0% 100%
12/15/2021 11 770 770 0 0 77000% 0%
12/15/2021 11 770 770 0 0 77000% 0%
12/30/2021 -15 770 770 0 0 77000% 0%
12/30/2021 -15 770 770 0 0 77000% 0%
Performance % Complete - Labor Units3
0.3686
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
1
1
1
1
1
1
1
0.3247
0.3461
0.6399
0.6399
0.4093
0.7202
0.0694
0.4213
1
1
0.2691
1
0
0.1812
0.8105
0
0
0.6
0
0.0596
0
0.2619
0
0
0
0.3646
0.0592
0
0.14
0
0
0.4064
1
0.6672
0.1355
0.5551
0.225
0.9765
0
0.5988
0
0.3449
0.6576
0.6576
0.4092
0.7202
0.0693
0.1613
0.82
0.2619
1
0.0166
0
0.2367
0
0
0.3138
1
0.2694
1
0.0077
0
0
0.5189
0
0
0
0.3607
0.4184
0.6558
0.6762
0
0.4092
0.72
0.0693
0.4368
1
0.1355
0.739
0.833
0.349
0
0.365
0.4414
0
0.2385
0.1355
0.6572
0
0
0.1259
0
0.1837
0.3479
1
0.9321
1
0.1355
0.6572
0
0
0
0.3782
0
0.085
1
0.7027
0
0
0.2587
0.2085
0
0.3183
0.1537
0.1689
0.3165
0
0
0
0.0311
0.815
1
0.9321
1
0
0
0
0
0.4228
0.6572
0.6572
0.4092
0.4092
0.8272
0.9634
0.9717
0.9027
0
0
0
0
0.51
0.5438
1
0.66
1
0.1804
0.8752
0
0
0
0.2581
0.2941
1
0.668
0.1959
0
0
0.0202
0
0.6
0
0
0.0217
0
0
0
0.1848
0.69
0
0.1543
0.2032
0
0.2206
0.1671
0
0
0
0
0.5105
0.0867
0
0
0.0924
0.0865
0
0
0.0922
0.3645
0.7716
0.7719
0.7708
0.5433
0.8514
0.4132
0.9869
0
0
0.85
0
0.985
0
0
0.3892
0.5336
0.2091
0.3423
0.5214
0.4406
0.4406
0.0058
0.0688
0
0
0
0.0031
0
0
0.0163
0
0.0014
0
0
0
0
0.0357
0.0229
0
0.3512
0.3512
1
0
0.8083
0
0
0
0
0
0.4989
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.8846
0
0
1
1
1
1
1
1
1
1
1
1
1
1
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0.2521
0.2195
0.3
0
0
0.3
0.3211
0.4
0.3
0.5456
1
0.07
0
0.95
0
0
0.9
0.3062
0.7
0.7
0
0
0
0.0254
0.1
0
0
0
1
0
1
0
0
0
0
SEMANA 33
GENERAL
Data Qty. EV Sem % EV
Commoditie 8W UNID. Sum - CANTSum - CANT. P 33.86 79%
RELLENO m3 5,259.54 4,092.71 3,533.56 78%
CONCRETO m3 1,717.59 567.51 -75,217.75 33%
ESTRUCTURAS kg ### 75,785.26 54,393.26 64%
DESMONTAJE kg 30,329.00 21,392.00 13,555.65 71%
TRANSPORTE kg 19,590.00 12,753.31 10,662.98 65%
MALLA m 3,118.00 2,090.33 1,484.99 67%
PIPING m 2,452.61 605.34 -508.75 25%
PIPING-ELEC m 4,479.00 1,167.82 805.26 26%
PLANCHA kg 2,622.00 362.56
POR SECTORES
Data Qty. EV Sem % EV
SECTOR Commoditie 8W UNID. Sum - CANTSum - CANT. P 0.00 26%
S1 CONCRETO m3 494.00 128.00 -485.00 26%
DESMONTAJE kg 613.00 613.00 -34,056.25 100%
ESTRUCTURAS kg 36,062.00 34,669.25 34,280.25 96%
EXCAVACIÓN m3 411.00 389.00 389.00 95%
PIPING m 74.00 0.00 0.00 0%
PIPING-ELEC m 366.00 0.00 0.00 0%
PLANCHA kg 761.00 0.00 -52.78 0%
RELLENO m3 151.00 52.78 -558.22 35%
TRANSPORTE kg 611.00 611.00 572.62 100%
S2 CONCRETO m3 190.38 38.38 -17,488.74 20%
ESTRUCTURAS kg 19,459.00 17,527.12 17,334.02 90%
EXCAVACIÓN m3 223.55 193.10 193.10 86%
PIPING m 37.00 0.00 0.00 0%
PIPING-ELEC m 302.00 0.00 0.00 0%
PLANCHA kg 744.00 0.00 -121.87 0%
RELLENO m3 121.87 121.87 -16.13 100%
S3 CONCRETO m3 398.00 138.00 -684.00 35%
DESMONTAJE kg 9,759.00 822.00 -4,691.26 8%
ESTRUCTURAS kg 21,126.00 5,513.26 5,403.26 26%
EXCAVACIÓN m3 392.00 110.00 110.00 28%
PIPING m 49.35 0.00 0.00 0%
PIPING-ELEC m 492.00 0.00 -130.56 0%
PLANCHA kg 200.00 130.56 107.56 65%
RELLENO m3 102.00 23.00 -1,941.70 23%
TRANSPORTE kg 9,754.00 2,917.31 2,727.31 30%
S4 CONCRETO m3 259.00 190.00 -19,767.00 73%
DESMONTAJE kg 19,957.00 19,957.00 2,296.40 100%
ESTRUCTURAS kg 38,511.00 17,660.60 17,429.60 46%
EXCAVACIÓN m3 231.00 231.00 231.00 100%
PIPING m 90.26 0.00 0.00 0%
PIPING-ELEC m 435.00 0.00 -232.00 0%
PLANCHA kg 917.00 232.00 160.00 25%
RELLENO m3 72.00 72.00 -5,188.65 100%
TRANSPORTE kg 9,225.00 9,225.00 9,160.23 100%
S5 CONCRETO m3 363.83 73.13 -341.90 20%
ESTRUCTURAS kg 2,862.00 415.03 -2,915.12 15%
EXCAVACIÓN m3 4,050.93 3,364.01 1,273.68 83%
MALLA m 3,118.00 2,090.33 1,484.99 67%
PIPING m 2,051.00 605.34 -508.75 30%
PIPING-ELEC m 2,884.00 1,167.82 -1,538.12 40%
RELLENO m3 3,328.18 2,743.52
MANO DE OBRA DIRECTO E INDIRECTO
CONTRATO MOB00321
CONTRATISTA CONSORCIO AJANI-M&J
PROYECTO 17032 - CONSTRUCCION DE ALMACEN DE RESIDUOS ETAPA: CONSTRUCCION - 105
INICIO CONTRATO 5/4/2021
FIN CONTRATO 10/30/2021
SEMANA N°26 (DEL 22 DE OCTUBRE AL 28 OCTUBRE 2021)
CRAFT/FUNCTION STATUS
S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S16 S17 S18 S19 S20 S21 S22 S23 S24 S25 S26 S27 S28 S29 S30 S31 S32 S33 S34 S35
TOTAL
5/4/2021 5/7/2021 5/14/2021 5/21/2021 5/28/2021 6/4/2021 6/11/2021 6/18/2021 6/25/2021 7/2/2021 7/9/2021 7/16/2021 7/23/2021 7/30/2021 8/6/2021 8/13/2021 8/20/2021 8/27/2021 9/3/2021 9/10/2021 9/17/2021 9/24/2021 10/1/2021 10/8/2021 10/15/2021 10/22/2021 10/29/2021 11/5/2021 11/12/2021 11/19/2021 11/26/2021 12/3/2021 12/10/2021 12/17/2021 12/24/2021
5/6/2021 5/13/2021 5/20/2021 5/27/2021 6/3/2021 6/10/2021 6/17/2021 6/24/2021 7/1/2021 7/8/2021 7/15/2021 7/22/2021 7/29/2021 8/5/2021 8/12/2021 8/19/2021 8/26/2021 9/2/2021 9/9/2021 9/16/2021 9/23/2021 9/30/2021 10/7/2021 10/14/2021 10/21/2021 10/28/2021 11/4/2021 11/11/2021 11/18/2021 11/25/2021 12/2/2021 12/9/2021 12/16/2021 12/23/2021 12/30/2021
MANO DE OBRA DIRECTO
OBRAS PRELIMINARES LB-0 0 4 5 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5
LC-4 4 4 15 8 4 4 15
OBRAS PROVISIONALES LB-0 0 14 16 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16
LC-4 4 4 15 13 10 5 15
CAPATAZ DE OBRAS CIVILES LB-0 0 sem 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 1
LC-4 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 3 4 4 4 2 3 3 3 3 3 3 3 3 3 2 2 0 4
FORECAST 3 3 3 3 3 3 2 2 0 3
ACTUAL 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
LB-0 0 0 0 0 1 1 2 3 3 4 4 6 6 6 6 5 6 4 4 3 1 1 1 0 0 0 0 6
LC-4 2 1 3 3 1 1 1 6 6 6 6 6 6 10 8 8 4 4 10 14 14 14 6 6 7 7 7 7 7 7 7 6 6 6 2 14
FORECAST 7 7 7 7 7 6 6 6 2 7
ACTUAL 2 2 3 6 4 3 3 3 3 2 2 2 2 2 2 4 4 4 4 4 4 5 4 8 7 4 8
OPERARIO LB-0 0 0 0 0 5 6 10 15 15 18 20 28 30 28 28 26 29 23 21 16 6 5 5 2 1 0 0 30
LC-4 2 1 4 4 4 4 4 4 4 4 4 4 20 10 10 15 19 19 25 30 30 30 16 26 26 26 30 40 40 40 25 20 16 16 2 40
FORECAST 30 40 40 40 25 20 16 16 2 40
ACTUAL 3 3 9 12 11 8 11 11 17 9 9 9 9 9 9 19 19 19 21 25 24 18 15 30 36 27 36
OFICIAL LB-0 0 0 0 0 5 6 10 15 15 18 20 28 30 28 28 26 29 23 21 16 6 5 5 2 1 0 0 30
LC-4 4 4 3 3 3 3 3 3 3 3 10 10 10 20 15 15 21 27 27 27 16 30 30 30 30 40 40 40 30 20 16 16 3 40
FORECAST 30 40 40 40 30 20 16 16 3 40
ACTUAL 1 1 9 8 6 2 1 1 7 6 6 6 6 6 6 15 15 15 15 23 23 21 22 28 26 21 28
PEON LB-0 0 0 0 0 3 4 6 9 9 11 12 17 18 17 17 16 17 13 13 10 5 3 3 1 0 0 0 18
LC-4 1 1 6 6 2 2 2 6 9 9 6 6 2 15 35 35 19 19 11 14 14 14 8 15 20 20 20 20 20 20 15 11 7 7 3 35
FORECAST 20 20 20 20 15 11 7 7 3 20
ACTUAL 2 2 0 2 1 0 3 3 7 7 7 7 7 9 9 19 19 19 19 17 17 20 7 22 31 40 40
CAPATAZ MECANICA LB-0 0 0 0 0 0 0 0 0 0 0 1 1 2 2 3 3 3 2 2 4 3 3 1 1 0 0 0 4
LC-4 1 1 1 1 1 1 1 2 3 3 3 3 3 3 3 2 1 1 1 1 1 1 1 1 1 1 1 1 4 4 4 4 4 4 1 4
FORECAST 1 1 4 4 4 4 4 4 1 4
ACTUAL 0 0 1 0 0 3 3 3 0 1 1 1 1 1 1 1 1 1 1 0 0 1 3 3
OPERARIO EQUIPO PESADO LB-0 0 0 0 0 0 0 0 0 0 0 1 2 3 3 6 6 5 5 4 7 6 5 2 2 1 0 0 7
LC-4 1 1 1 1 1 1 1 1 1 1 1 6 6 6 1 1 2 2 2 2 5 5 5 5 5 5 5 5 5 5 5 5 2 6
FORECAST 5 5 5 5 5 5 5 5 2 5
ACTUAL 0 0 1 1 0 2 4 4 1 3 3 3 3 3 3 1 1 1 4 4 4 7 6 6 7 6 7
OPERARIO LB-0 0 0 0 0 0 0 0 0 1 1 2 5 6 7 11 12 10 10 8 14 13 10 5 4 1 0 0 14
LC-4 1 4 4 1 1 1 1 1 1 1 1 1 6 6 6 5 5 3 4 4 4 8 2 2 2 2 8 12 12 18 25 25 20 2 25
FORECAST 2 8 12 12 18 25 25 20 2 25
ACTUAL 0 0 6 6 0 0 2 2 1 5 5 5 5 10 10 5 5 5 5 14 12 9 16 21 20 21 21
OFICIAL LB-0 0 0 0 0 0 0 0 0 0 1 2 5 6 7 11 12 10 9 8 14 13 10 5 4 1 0 0 14
LC-4 3 4 4 4 8 2 2 2 2 8 12 12 18 25 25 20 2 25
FORECAST 2 8 12 12 18 25 25 20 2 25
ACTUAL 0 0 3 3 0 0 0 0 8 10 10 10 8 8 8 7 7 7 7 4 4 2 2 7 9 9 10
SOLDADOR 4G LB-0 0 0 0 0 0 0 0 0 0 0 1 1 2 2 3 3 3 2 2 4 4 3 1 1 0 0 0 4
LC-4 2 2 2 2 3 3 3 3 3 3 3 2 0 0 1 1 1 1 3 1 1 1 1 1 2 4 4 4 4 4 1 4
FORECAST 1 1 2 4 4 4 4 4 1 4
ACTUAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CAPATAZ ELECTRICO LB-0 0 0 0 0 0 0 0 1 1 1 1 1 3 3 2 2 2 2 2 2 1 1 2 1 1 1 0 3
LC-4 0 1 1 1 0 0 0 1 2 4 4 2 2 3 3 3 1 4
FORECAST 2 4 4 2 2 3 3 3 1 4
ACTUAL 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
OPERARIO EQUIPO PESADO LB-0 0 0 0 0 0 0 0 1 1 2 2 1 5 5 4 4 5 5 4 4 3 3 3 3 1 1 1 5
LC-4 1 2 2 2 2 2 2 2 4 4 4 0 0 0 2 2 2 1 1 1 3 3 3 3 3 3 3 3 3 3 4
FORECAST 3 3 3 3 3 3 3 3 3 3
ACTUAL 0 0 0 0 0 2 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2
OPERARIO LB-0 0 0 0 0 0 0 0 2 3 4 4 2 10 10 8 9 10 10 9 8 5 5 7 5 3 2 1 10
LC-4 3 3 3 3 3 8 8 8 12 15 15 10 15 15 3 3 0 4 4 4 2 2 2 4 10 12 15 15 25 25 25 15 15 25
FORECAST 10 12 15 15 25 25 25 15 15 25
ACTUAL 0 0 0 0 0 0 0 0 5 3 3 3 3 3 3 3 3 3 3 1 1 1 2 3 5 1 5
OFICIAL LB-0 0 0 0 0 0 0 0 2 3 4 4 2 10 10 8 9 10 9 9 8 5 5 7 5 3 2 1 10
LC-4 1 1 1 1 1 1 2 1 1 1 1 9 15 15 3 3 0 4 4 4 2 2 2 4 10 12 15 15 15 15 15 15 10 15
FORECAST 10 12 15 15 15 15 15 15 10 15
ACTUAL 0 0 0 0 0 0 0 0 3 3 3 3 3 3 3 3 3 3 3 0 3
SOLDADOR 4G LB-0 0 0 0 0 0 0 0 1 1 1 1 1 3 3 2 2 2 2 2 2 1 1 2 1 1 1 0 3
LC-4 1 1 1 1 1 6 8 8 8 10 10 8 8 8 0 0 0 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 1 10
FORECAST 2 2 2 2 2 2 2 2 1 2
ACTUAL 0 0 0 0 0 0 0 0 0 0 0 0
MANO DE OBRA DIRECTA
LB-0 0 18 21 21 14 17 29 50 53 66 76 101 135 132 138 136 142 120 110 113 72 60 49 32 14 7 3 142
LC-4 7 6 29 29 21 22 23 43 52 51 52 57 75 95 124 137 71 71 80 113 113 113 79 97 103 110 128 166 184 184 176 171 158 138 48 184
FORECAST 0 128 166 184 184 176 171 158 138 48 184
ACTUAL 9 9 34 40 23 21 29 29 53 50 50 50 48 55 55 78 78 78 83 93 90 84 75 127 142 133 142
OPERARIO EQUIPO PESADO: RETROEXCAVADORA,
MINICARGADOR,VOLQUETE, EXCAVADORA
CONTRATO MOB00321
CONTRATISTA CONSORCIO AJANI-M&J
PROYECTO 17032 - CONSTRUCCION DE ALMACEN DE RESIDUOS ETAPA: CONSTRUCCION - 105
INICIO CONTRATO 5/4/2021
FIN CONTRATO 10/30/2021
SEMANA N°26 (DEL 22 DE OCTUBRE AL 28 OCTUBRE 2021)
CRAFT/FUNCTION STATUS
S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S16 S17 S18 S19 S20 S21 S22 S23 S24 S25 S26 S27 S28 S29 S30 S31 S32 S33 S34 S35
TOTAL
5/4/2021 5/7/2021 5/14/2021 5/21/2021 5/28/2021 6/4/2021 6/11/2021 6/18/2021 6/25/2021 7/2/2021 7/9/2021 7/16/2021 7/23/2021 7/30/2021 8/6/2021 8/13/2021 8/20/2021 8/27/2021 9/3/2021 9/10/2021 9/17/2021 9/24/2021 10/1/2021 10/8/2021 10/15/2021 10/22/2021 10/29/2021 11/5/2021 11/12/2021 11/19/2021 11/26/2021 12/3/2021 12/10/2021 12/17/2021 12/24/2021
5/6/2021 5/13/2021 5/20/2021 5/27/2021 6/3/2021 6/10/2021 6/17/2021 6/24/2021 7/1/2021 7/8/2021 7/15/2021 7/22/2021 7/29/2021 8/5/2021 8/12/2021 8/19/2021 8/26/2021 9/2/2021 9/9/2021 9/16/2021 9/23/2021 9/30/2021 10/7/2021 10/14/2021 10/21/2021 10/28/2021 11/4/2021 11/11/2021 11/18/2021 11/25/2021 12/2/2021 12/9/2021 12/16/2021 12/23/2021 12/30/2021
S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S16 S17 S18 S19 S20 S21 S22 S23 S24 S25 S26 S27 S28 S29 S30 S31 S32 S33 S34 S35
0
10
20
30
40
50
60
70
0
10
20
30
40
50
60
26 26
29
35
41
44
45 45
47
49 49 49 49 49 49 49 49 49
48 48 48 48
47
44
35 35 35
0 0 0 0 0 0
32 32
36
37
39
45
48 48
50
51 51
52
53 53 53 53
41 41
50 50 50
51
62
54
53 53
54 54 54 54 54 54
53
47
43
54 54 54 54 54 54
53
47
43
8 8
12 13
6
14
23 23
26 25
21
23 23
18
26 26 26 26 26
34 34 34
37
40
42
37
12 12
12
12
12
12
12 12
12
12
10
8 8
9
9 10 10 10 10
9 9 10
14
14 10
15
HISTOGRAMA DE MANO OBRA INDIRECTA
SEMANA
CANTIDAD
EQUIPO PESADO Y MENORES
CONTRATO MOB00321
CONTRATISTA CONSORCIO AJANI-M&J
PROYECTO 17032 - CONSTRUCCION DE ALMACEN DE RESIDUOS ETAPA: CONSTRUCCION - 105
INICIO CONTRATO 5/4/2021
FIN CONTRATO 10/30/2021
SEMANA N°26 (DEL 22 DE OCTUBRE AL 28 OCTUBRE 2021)
CATEGORY STATUS
S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S16 S17 S18 S19 S20 S21 S22 S23 S24 S25 S26 S27 S28 S29 S30 S31 S32 S33 S34 S35
TOTAL
5/4/2021 5/7/2021 5/14/2021 5/21/2021 5/28/2021 6/4/2021 6/11/2021 6/18/2021 6/25/2021 7/2/2021 7/9/2021 7/16/2021 7/23/2021 7/30/2021 8/6/2021 8/13/2021 8/20/2021 8/27/2021 9/3/2021 9/10/2021 9/17/2021 9/24/2021 10/1/2021 10/8/2021 10/15/2021 10/22/2021 10/29/2021 11/5/2021 11/12/2021 11/19/2021 11/26/2021 12/3/2021 12/10/2021 12/17/2021 12/24/2021
5/6/2021 5/13/2021 5/20/2021 5/27/2021 6/3/2021 6/10/2021 6/17/2021 6/24/2021 7/1/2021 7/8/2021 7/15/2021 7/22/2021 7/29/2021 8/5/2021 8/12/2021 8/19/2021 8/26/2021 9/2/2021 9/9/2021 9/16/2021 9/23/2021 9/30/2021 10/7/2021 10/14/2021 10/21/2021 10/28/2021 11/4/2021 11/11/2021 11/18/2021 11/25/2021 12/2/2021 12/9/2021 12/16/2021 12/23/2021 12/30/2021
TRACTOR DE ORUGAS 190-240 HP LB-0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 1
LC-4 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
FORECAST 0 0 0 0 0 0 0 0 0 0
ACTUAL 0 0 0 0
RODILLO LISO VIBRATORIO MANUAL 0.8 - 1.1TON LB-0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 1
LC-4 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1
FORECAST 1 1 1 1 1 1 1 1 0 1
ACTUAL 1 1 1 1 1 1 1 1
RODILLO LISO VIBRATORIO 10 TON LB-0 0
LC-4 1 1 1 1 1 1
FORECAST 0
ACTUAL 1 1 1 1 1 1 1
EXCAVADORA LB-0 0
LC-4 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0
FORECAST 1 1 1 1 0 0 0 0 0 0
ACTUAL 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
RETROEXCAVADORA S/LLANTAS LB-0 0 0 0 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 1 1 1 0 0 0 0 0 0 2
LC-4 1 1 1 1 1 1 1 1 1 1 2 2 2 2 3 2 2 2 2 2 2 2 2 2 2 2 2 1 1
FORECAST 2 2 2 2 2 2 2 2 1 1
ACTUAL 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 1 2
MINICARGADOR S/LLANTAS LB-0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
LC-4 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0
FORECAST 1 1 1 1 1 1 1 1 0 1
ACTUAL 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CAMION VOLQUETE 15 M3 LB-0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
LC-4 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1
FORECAST 2 2 2 2 2 2 2 2 1 1
ACTUAL 0 0 0 1 1 1 1 1 0 0 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2
ALISADORA DE CONCRETO 5.5HP LB-0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 1
LC-4 2 2 2 2 2 2 2 2 2 2 2 2 2 0 2
FORECAST 2 2 2 2 2 2 2 2 0 2
ACTUAL 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 2 2
CAMION GRUA 21 TON LB-0 0 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 2
LC-4 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 2 2 2 2 2 2 2 2 2 2 2 2 1 3
FORECAST 2 2 2 2 2 2 2 2 1 2
ACTUAL 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 3 2 2 2 2 3
MANLIFT 18 M LB-0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 1 1 2
LC-4 1 1 1 1 1 1 1 1 0 0 0 0 0 0 1 1 1 1 1 1 2 3 2 2 2 2 2 2 2 2 2 2 2 2 2 3
FORECAST 2 2 2 2 2 2 2 2 2 2
ACTUAL 1 1 1 1 1 1 1 1 0 0 0 0 0 0 1 1 1 1 1 1 1 1 2 2 2 2 2
MAQUINA DE SOLDAR LB-0 0 0 0 0 0 0 0 0 0 3 3 4 4 4 4 4 4 4 3 3 3 3 3 3 3 4
LC-4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 4 2 2 2 2 4 4 4 4 4 4 4 4 4 4
FORECAST 4 4 4 4 4 4 4 4 4 4
ACTUAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 2 2
GRUPO ELECTROGENO 100KW LB-0 0 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 2
LC-4 1 1 2 2 2 2 2 2 3 3 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 3
FORECAST 3 3 3 3 3 3 3 3 2 3
ACTUAL 1 1 2 2 2 2 2 2 3 3 2 2 2 2 2 2 2 2 2 4 4 4 3 3 3 3 4
EQUIPOS DE PINTURA LB-0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 2 2 2 2 2 2 2 1 1 1 2
LC-4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0 2 2 2 2 2 2 2 2 2 2 2 2 2
FORECAST 2 2 2 2 2 2 2 2 2 2
ACTUAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0 2 2 2
EQUIPO DE TERMOFUSION LB-0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 1
LC-4 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 0 0 0 1
FORECAST 0
ACTUAL 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 0 0 0 1
CAMIONETA LB-0 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
LC-4 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 2 3
FORECAST 3 3 3 3 3 3 3 3 2 3
ACTUAL 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 2 2 2 3 3
BUS DE PASAJEROS LB-0 0 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 0 0 2
LC-4 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 3 3 4 4 4 4 4 4 4 3 2 1 4
FORECAST 4 4 4 4 4 4 3 2 1 4
ACTUAL 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 4 4 3 3 3 4 4
SPRINTER LB-0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
LC-4 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2
FORECAST 1 1 1 1 1 1 1 1 1 1
ACTUAL 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 4 1 1 1 1 1 1 4
TORRE DE ILUMINACION LB-0 0 0 0 0 0 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 0 0 0 0 0 2
LC-4 0 0 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 10 10 10 10 10 10 10 10 10 8 4 10
FORECAST 10 10 10 10 10 10 10 8 4 10
ACTUAL 0 0 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 10 10 10 10 10
CAMION GRUA GG LB-0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1
LC-4 0
FORECAST 0
ACTUAL 0
CAMION DE COMBUSTIBLE LB-0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
LC-4 0
FORECAST 0
ACTUAL 0
TOTAL PROGRAMADO LB-0 1 6 7 9 9 12 16 16 18 25 25 27 27 27 27 27 28 28 26 26 25 23 18 16 15 7 6 0 0 0 0 0 29
LC-4 3 6 11 12 11 11 12 14 15 16 15 16 16 16 17 17 17 18 23 24 27 36 28 31 36 38 40 40 40 40 39 39 38 35 22 42
FORECAST 40 40 40 40 39 39 38 35 21 37
TOTAL ACTUAL ACTUAL 3 6 11 13 13 13 14 15 15 16 16 17 17 17 18 18 18 20 23 30 30 28 35 35 36 37 45
LOG DE RESTRICCIONES - CONSTRUCCIÓN DEL PATIO DE RESIDUOS
ID DESCRIPCIÓN
R-1
R-2 No se tiene el permiso para desmontaje del módulo OyP.
R-3 No se cuenta con material de relleno 2B Rechazado
R-4 Respuesta y aprobación de RFI-107
R-5 Reingreso de personal electricista por cierre de ruta 111 (Aquia)
R-6 Respuesta y aprobación del RFI-111
R-7 Aprobación de materiales de ferretería para trabajos de media tensión
R-8 No se ha coordinado reunión para definir tie in para RAG
R-9
R-10
R-11 No se cuenta con material de relleno 2B y Top Soil adecuado para realizar trabajos
No se cuenta con aprobación para estacionamiento de buses en taller movil bus, esto
dificulta los trabajos para la liberación de áreas dentro de la plataforma.
No se cuenta con los siguientes RED LINEaprobados:
- RED LINE N° (89) 975-C-40096_1_RL1 (18.11.2021) partida de alumbrado electrico
- RED LINE N° (90) 975-C-20127 _0_RL1 (18.11.2021) *partidas de obras civiles
MODULO M
RED LINE N° (91) 975-C-20128_0_RL1 (18.11.2021) *partidas de obras civiles
MODULO N
- RED LINE N° (85) 975-E-10103_1_FSK2 (16.11.2021) partidas de buzones eléctricos
(975-MH-1001 /975-MH-1002) incluye bancoductos
RED LINE N° (86) 975-E- 10103 _1_FSK3 (16.11.2021) partidas de buzones eléctricos
(975-MH-1006) incluye bancoductos
RED LINE N° (87) 975-E-40096_1_FSK4 (16.11.2021) partidas de buzones eléctricos
(975-MH-1009) inlcuye bancoductos
RED LINE N° (87) 975-E-40096_1_FSK4 (16.11.2021)
Pendiente aprobación de RFIs para:
-Definición de alturas de tapas para buzones de red de aguas negras en el sector 5
-Definición de detalle estructuras de los dados de las retenidas de los postes.
12/25/2021
Fecha Identificación Fecha Requerida Plazo Status Responsable
10/21/2021 10/25/2021 5.00 Superado SNC-Lavalin
10/15/2021 11/12/2021 -43 dias Superado Antamina
10/21/2021 10/23/2021 3.00 Superado Antamina
11/6/2021 11/8/2021 3.00 Superado
11/6/2021 11/9/2021 4.00 Superado
11/6/2021 11/9/2021 4.00 Superado
11/18/2021 11/23/2021 -32 dias Superado
11/18/2021 11/20/2021 -35 dias Superado
11/18/2021 11/20/2021 -35 dias Superado
12/6/2021 12/13/2021 -12 dias Superado
12/3/2021 12/6/2021 -19 dias Superado
SNC-Lavalin /
Ingeniería
Antamina
Consorcio Ajani -
M&J
Consorcio Ajani -
M&J
SNC-Lavalin /
Ingeniería
Antamina
SNC-Lavalin /
Ingeniería
Antamina
SNC-Lavalin /
Ingeniería
Antamina
SNC-Lavalin /
Ingeniería
Antamina
SNC-Lavalin /
Antamina
Observación
Coordinar una reunión con Antamina.
Se requiere brindar material adecuado para iniciar y culminar los
rellenos de redes subterraneas y poder liberar trabajos por áreas
interferidas
3) Desempeño programación 8WLA
SEM 31 SEM 32 SEM 33 SEM 34 SEM 35 SEM 36 S
-2.00%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
4.86%
5.12%
1.42%
1.83%
1.66%
1.07%
1.42%
3.64%
5.51%
45.32%
46.99% 48.06%
48.06%
49.48%
53.12%
58.63%
6
76.72%
84.49%
91.65%
98.65%
100.00% 100.00% 1
% Programado 3WLA Anteriores % Avance Real Semanal % Programado 3WLA Proyección % Avance Real Acumulado % Forecast Acum