Está en la página 1de 9

PARTIDAS DESCRIPCIÓN UND.

LARGO (m) ANCHO (m) N° veces


OE.1.1 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
OE.1.1.1 CONSTRUCCIONES PROVISIONALES
OE.1.1.1.1 Oficinas m2 6 3 1
OE.1.1.1.2 Almacenes m2 3 2 1
OE.1.1.1.3 Comedor m2 4 2 1
OE.1.1.1.4 Vestuario m2 3 2 1
OE.1.1.1.5 SSHH m2 2 1.5 1
OE.1.1.1.6 Cerco m 70 1
OE.1.1.1.7 Cartel Und. 1
Parcial Total

18
6
8
6
3 41 m2
70 70 m
1 1 Und.
EXCAVACION
PARTIDA LONG. (m) ANCHO (m) ALTURA (m) CANT. VOL (m3)

ZAPATA Z-1 2.15 1.20 1.00 1.00 2.58

ZAPATA Z-2 1.40 1.20 1.00 2.00 3.36

ZAPATA Z-3 1.20 1.20 1.00 1.00 1.44

ZAPATA Z-4 1.40 1.20 1.00 2.00 3.36

TOTAL 10.74

Factor de esponjamiento 1.35


ELIMINACION 6.35 m3

NIVELACIÒN INTERIOR Y APISONADO


PARTIDA LONG. (m) ANCHO (m) CANT. AREA (m2)
OE.2.1.1
ZAPATA Z-2 13.40 5.00 1.00 67.00
MURO EJE 3 5.00 0.30 -1.00 -1.50
COLUMNA C2 1.50 0.30 -1.00 -0.45
MURO EJE 1 5.00 0.30 -1.00 -1.50

TOTAL 63.55
RELLENO (con material propio)
LONG. (m) ANCHO (m) ALTURA (m) CANT. VOL (m3)

2.15 1.20 1.00 1.00 2.58


1.50 0.30 0.40 -1.00 -0.18
1.10 0.30 0.20 -2.00 -0.13

1.40 1.20 1.00 2.00 3.36


1.40 0.30 0.40 -1.00 -0.17
1.35 0.30 0.20 -1.00 -0.08

1.20 1.20 1.00 1.00 1.44


5.00 0.30 1.35 -1.00 -2.03
0.80 0.30 0.20 -1.00 -0.05
1.40 1.20 1.00 2.00 3.36
5.00 0.30 1.35 -1.00 -2.03
0.80 0.30 0.20 -1.00 -0.05
TOTAL 6.03
SOLADO
PARTIDA LONG (m) ANCHO (m) CANT. ÁREA (m2)

SOLADO (e=5cm) 3.60 2.60 1.00 9.36

CONCRETO ENCOFRAD
PARTIDA LONG (m) ANCHO (m) ALTURA (m) CANT. VOL (m3) PERIM (m)

CIMIENTO CORRIDO 1.47 0.50 0.60 1.00 0.44 3.45


Concreto Ciclopeo 1.56 0.50 0.60 1.00 0.47 3.14
f'c 100kg/cm2+30%PG 0.43 0.50 0.60 1.00 0.13 1.36
1.38 0.50 0.60 1.00 0.41 1.33
0.45 0.50 0.60 1.00 0.14 2.33
1.59

SOBRECIMIENTO 1.60 0.15 0.60 1.00 0.14 3.35


f'c 175kg/cm2+25%PM

SUB ZAPATA 4.00 1.13 0.50 1.00 2.25


f'c 100kg/cm2+30%PG

BASE DE CONCRETO 1.00 0.40 0.30 1.00 0.12 2.80


ENCOFRADO
ALTURA (m) CANT. ÁREA (m2)

0.60 1.00 2.07


0.60 1.00 1.88
0.60 1.00 0.82
0.60 1.00 0.80
0.60 1.00 1.40
6.97

0.60 1.00 2.01

0.30 1.00 0.84


ACERO DE REFUERZO
FIERRO EN C/ELEMENTO LONGITUD TOTAL (m)
ELEMENTO DIAM CANT LONG. (m) N.E. 3/8 1/2 5/8 3/4
Zapata Z-2 5/8 26 2.95 1.00 - - 76.70 -
5/8 14 5.45 1.00 - - 76.30 -

Zapata Z-3 5/8 19 2.95 1.00 - - 56.05 -


5/8 14 3.95 1.00 - - 55.30 -

TOTAL 0.00 0.00 264.35 0.00


Densidad Lineal (kg/m) - AA 0.526 0.934 1.459 2.101
Área de barra (m2) 0.00007 0.00013 0.00020 0.00029
Densidad Lineal (kg/m) 0.56 0.99 1.55 2.24

Metrado por ratios 5.25


Acero 32.21 kg/m3 169.13
Encofrado 1.27 m2/m3 6.67
TAL (m) PESO (kg) CONCRETO ENCOFRADO
1 Parcial LONG (m) ANCHO (m) ALT (m) CANT. VOL (m3) PERIM (m) ALT (m)
- 119.17 5.00 2.50 0.60 1.00 7.50 15.00 0.60
- 118.55

- 87.09 3.50 2.50 0.60 1.00 5.25 12.00 0.60


- 85.92

0.00 410.74 12.75


3.735
0.00051
3.98

APU 1m3
1m2
1kg
ENCOFRADO
CANT. ÁREA (m2)
1.00 9.00

1.00 7.20

16.20

También podría gustarte