CRONOGRAMA VALORIZADO DE ADQUISICIONES

PROYECTO REMODELACION DE CAMPO DEPORTIVO; EN EL(LA) IE 50254 - MARANURA EN LA LOCALIDAD HUALLPAMAYTA, DISTRITO DE MARANURA, PROVINCIA LA CONVENCION,
DEPARTAMENTO CUSCO"

PRESUPUESTO CAMPO DEPORTIVO HUALLPAMAYTA S10 S.A.C.


Lugar CUSCO - LA CONVENCION - MARANURA
MES 1 MES 2 MES 3
Item Descripción Und. Metrado Precio (S/.) Parcial (S/.) TOTAL CANTIDAD TOTAL PARCIAL
del 01/12/2021 al 31/12/2021 del 01/01/2022 al 31/01/2022 del 01/02/2022 al 28/02/2022
OPERARIO hh 954.83 7.50 7,161.22 318.28 2,387.07 318.28 2,387.07 318.28 2,387.07 954.83 7,161.23
OFICIAL hh 1,128.73 6.25 7,054.55 376.24 2,351.52 376.24 2,351.52 376.24 2,351.52 1,128.73 7,054.55
PEON hh 2,015.78 5.00 10,078.90 671.93 3,359.63 671.93 3,359.63 671.93 3,359.63 2,015.78 10,078.90
MANO DE OBRA OPERADOR DE EQUIPO PESADO hh 24.46 8.33 203.75 8.15 67.92 8.15 67.92 8.15 67.92 24.46 203.75
OPERADOR DE EQUIPO LIVIANO hh 28.80 9.37 269.86 9.60 89.95 9.60 89.95 9.60 89.95 28.80 269.86
OPERARIO TOPOGRAFO hh 27.20 8.33 226.54 9.07 75.51 9.07 75.51 9.07 75.51 27.20 226.54
TECNICO EN ENFERMERIA día 60.00 50.00 3,000.00 20.00 1,000.00 20.00 1,000.00 20.00 1,000.00 60.00 3,000.00
TOTAL MANO DE OBRA 27,994.82 9,331.60 9,331.60 9,331.60 27,994.82
ACEITE MULTIGRADO 10w-30 gal 0.11 55.00 6.18 0.11 6.18 0.11 6.18
GRASA DE USO GENERAL kg 6.00 2.00 12.00 6.00 12.00 6.00 12.00
GASOLINA gal 1.12 14.00 15.62 1.12 15.62 1.12 15.62
GASOLINA 84 gal 1.41 14.00 19.68 1.41 19.68 1.41 19.68
PETROLEO D-2 gal 9.17 15.50 142.17 9.17 142.17 9.17 142.17
EMULSION ASFALTICA gal 1.13 35.00 39.38 1.13 39.38 1.13 39.38
LISTONES DE MADERA CORRIENTE DE 2"X3"X3M und 68.65 14.00 961.14 68.65 961.14 68.65 961.14
ALAMBRE NEGRO RECOCIDO N° 8 kg 20.80 5.00 104.02 20.80 104.02 20.80 104.02
ALAMBRE NEGRO RECOCIDO N° 16 kg 20.80 5.00 104.02 20.80 104.02 20.80 104.02
ALAMBRE NEGRO N° 16 kg 1.20 5.00 6.01 1.20 6.01 1.20 6.01
PIEDRA MEDIANA DE 6" A 8" m3 13.43 50.00 671.55 13.43 671.55 13.43 671.55
ANGULOS DE ACERO DE 1 1/2"X1 1/2"X1/8" X 6 m m 40.68 35.00 1,423.80 40.68 1,423.80 40.68 1,423.80
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 49.96 5.00 249.81 49.96 249.81 49.96 249.81
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 var 37.29 20.00 745.80 37.29 745.80 37.29 745.80
CLAVOS PARA MADERA CON CABEZA DE 3" kg 31.21 4.50 140.43 31.21 140.43 31.21 140.43
CLAVOS PARA MADERA CON CABEZA DE 4" kg 20.80 4.50 93.62 20.80 93.62 20.80 93.62
TUBO DE F°G° DE 2"X1.8mmX 6m m 122.85 14.17 1,740.78 122.85 1,740.78 122.85 1,740.78
ESPARRAGO DE ANCLAJE DE D=3/4"X3MM und 160.00 9.53 1,524.80 160.00 1,524.80 160.00 1,524.80
ARCOS METALICOS DE TUBO CIRCULAR DE 2"X1.8MM und 2.00 400.00 800.00 0.00 2.00 800.00 2.00 800.00
CASCO DE SEGURIDAD DE COLORES und 5.00 25.00 125.00 5.00 125.00 5.00 125.00
GUANTES DE CUERO par 10.00 5.00 50.00 10.00 50.00 10.00 50.00
LENTES DE PROTECCION und 5.00 10.00 50.00 5.00 50.00 5.00 50.00
CHALECO C/ANARANJADO CONCINTA REFLEXIVAY LOGOTIPO DE OBRA und 5.00 20.00 100.00 5.00 100.00 5.00 100.00
PONCHO DE LLUVIA und 5.00 15.00 75.00 5.00 75.00 5.00 75.00
BOTAS DE JEBE (TALLAS VARIADAS) par 5.00 20.00 100.00 5.00 100.00 5.00 100.00
PGLAC A36 200X200X6MM. PLANCHA BASE m2 3.20 254.24 813.57 3.20 813.57 3.20 813.57
RIGIDIZADOR E=12MM. (PGLAC A36) und 128.00 8.47 1,084.16 128.00 1,084.16 128.00 1,084.16
RIGIDIZADOR E=4.5MM. (PGLAC A36) und 160.00 3.39 542.40 160.00 542.40 160.00 542.40
CARTELA, PDLAC 600X600X4.5MM. m2 11.52 129.66 1,493.68 11.52 1,493.68 11.52 1,493.68
ARRANQUE, PGLAC E=6MM m2 8.00 165.25 1,322.00 8.00 1,322.00 8.00 1,322.00
PGLAC 180X750X6mm, REFUERZO EN COLUMNA m2 2.16 165.25 356.94 2.16 356.94 2.16 356.94
PGLAC 180X300X6mm, REFUERZO EN COLUMNA m2 0.86 165.25 142.78 0.86 142.78 0.86 142.78
PIEDRA CHANCADA 1/2" m3 27.59 80.00 2,207.12 27.59 2,207.12 27.59 2,207.12
PIEDRA CHANCADA 1" m3 25.39 80.00 2,031.36 25.39 2,031.36 25.39 2,031.36
MATERIALES ARENA m3 2.76 50.00 138.06 2.76 138.06 2.76 138.06
ARENA FINA m3 0.59 55.00 32.67 0.59 32.67 0.59 32.67
ARENA GRUESA m3 23.63 60.00 1,417.98 23.63 1,417.98 23.63 1,417.98
TUBO METALICO LAC 100X50X2.5MM. m 472.00 18.00 8,496.00 236.00 4,248.00 236.00 4,248.00 472.00 8,496.00
TUBO METALICO LAC 50X50X2.5MM. m 336.00 11.00 3,696.00 168.00 1,848.00 168.00 1,848.00 336.00 3,696.00
TUBO METALICO LAC 50X75X2.5MM. m 1,364.25 15.00 20,463.71 682.12 10,231.86 682.12 10,231.86 1,364.25 20,463.71
TUBO METALICO LAC 75X75X2.5MM. m 140.00 21.19 2,966.60 70.00 1,483.30 70.00 1,483.30 140.00 2,966.60
BOTIQUIN DE PRIMEROS AUXILIOS CON IMPLEMENTOS glb 1.00 350.00 350.00 1.00 350.00 1.00 350.00
CAMILLA PARA TRASLADO DE EMERGENCIAS und 1.00 100.00 100.00 1.00 100.00 1.00 100.00
SOLDADURA SUPERCITO PUNTO AZUL DE 1/8" kg 34.19 14.50 495.79 34.19 495.79 34.19 495.79
PLATINA DE F° DE 4"X4"X1.8mm und 33.90 30.00 1,017.00 33.90 1,017.00 33.90 1,017.00
MATERIAL GRANULAR PARA RELLENO m3 64.21 40.00 2,568.30 64.21 2,568.30 64.21 2,568.30
AGUA PUESTA EN OBRA m3 14.60 5.00 73.01 14.60 73.01 14.60 73.01
MALLA OLYMPICA GALVANIZADA N° 12 ROLLO DE 2 X 20 M rll 6.78 950.00 6,441.00 0.00 6.78 6,441.00 6.78 6,441.00
COLUMNA METALICA DE 200X200X4.5MM, FABRICADO DEPLGLAC A36, H=6 M. und 16.00 700.00 11,200.00 16.00 11,200.00 16.00 11,200.00
ALUZINC PREPINTADO AL HORNO m2 1,197.43 33.00 39,515.21 0.00 1,197.43 39,515.21 1,197.43 39,515.21
CEMENTO PORTLAND TIPO I (42.5 kg) bol 339.37 26.00 8,823.72 339.37 8,823.72 339.37 8,823.72
YESO BOLSA 28 kg bol 1.81 15.00 27.08 1.81 27.08 1.81 27.08
OCRE ROJO kg 8.18 10.00 81.75 8.18 81.75 8.18 81.75
TUBERIA C.S.N. UF DN. 200 mm m 36.75 75.00 2,756.25 36.75 2,756.25 36.75 2,756.25
MADERA TORNILLO p2 19.23 8.00 153.86 19.23 153.86 19.23 153.86
REGLA DE MADERA TORNILLO p2 0.95 800.00% 7.56 0.95 7.56 0.95 7.56
TRIPLAY DE 1.20X2.40 m X 18 mm und 72.19 10000.00% 7,218.99 72.19 7,218.99 72.19 7,218.99
LIJA PARA FIERRO plg 6.48 200.00% 12.95 6.48 12.95 6.48 12.95
PINTURA ESMALTE gal 5.87 3500.00% 205.36 5.87 205.36 5.87 205.36
PINTURA ANTICORROSIVA gal 42.1646 35 1475.76 42.16 1,475.76 42.16 1,475.76
THINNER gal 43.52 20.00 870.47 43.52 870.47 43.52 870.47
CINTA AUTOADHESIVA MASKING TAPE 19 X 50 m pza 60 5 300 60.00 300.00 60.00 300.00
TORNILLO AUTOPERFORANTE DE 100 MM X 3 MM und 6842.46 0.5 3421.23 6,842.46 3,421.23 6,842.46 3,421.23
SOLDADURA ELECTRICA CELLOCORD P 3/16" kg 111.7819 13.56 1515.76 111.78 1,515.76 111.78 1,515.76
MES 1 MES 2 MES 3
Item Descripción Und. Metrado Precio (S/.) Parcial (S/.) TOTAL CANTIDAD TOTAL PARCIAL
del 01/12/2021 al 31/12/2021 del 01/01/2022 al 31/01/2022 del 01/02/2022 al 28/02/2022
BARBIJO DE PROTECCION TRES PLIEGOS und 100 0.5 50 100.00 50.00 100.00 50.00
GUANTES DE JEBE par 10 7 70 10.00 70.00 10.00 70.00
TUERCA HEXAGONAL DE 3/4" und 160 2.97 475.2 160.00 475.20 160.00 475.20
ALCOHOL l 3 12 36 3.00 36.00 3.00 36.00
JABON LIQUIDO ANTIBACTERIAL X 800 ml. PARA DISPENSADOR und 3 10 30 3.00 30.00 3.00 30.00
TOTAL MATERIALES 145,798.09 81,230.73 63,767.36 800.00 145,798.09
NIVEL TOPOGRAFICO día 3.27 70 228.9 3.27 228.9 3.27 228.90
ESTACION TOTAL día 0.1311 100 13.11 0.1311 13.11 0.13 13.11
HERRAMIENTAS MANUALES %mo 951.01 317.0033333 317.0033333 317.0033333 0.00 951.01
REGLA DE ALUMINIO 1" X 4" X 8" und 0.234 15 3.51 0.234 3.51 0.23 3.51
COMPACTADORA DE PLANCHA día 0.4137 45 18.62 0.4137 18.6165 0.41 18.62
RODILLO LISO VIBRATORIO hm 24.46 120 2935.2 24.46 2935.2 24.46 2,935.20
MAQUINA OXICORTE hm 57.6 10.17 585.79 28.8 292.896 28.8 292.896 57.60 585.79
SOLDADORA ELECTRICA hm 303.8714 21.19 6439.03 151.9357 3219.517483 151.9357 3219.517483 303.87 6,439.03
TROZADORA DE FIERRO hm 243.4211 8.05 1959.54 121.71055 979.7699275 121.71055 979.7699275 243.42 1,959.54
EQUIPOS
COMPRESORA NEUMATICA hm 269.0221 6.78 1823.97 134.51105 911.984919 134.51105 911.984919 269.02 1,823.97
MAQUINAS DE SOLDAR día 15.3961 35 538.86 7.69805 269.43175 7.69805 269.43175 15.40 538.86
MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 40.3611 12.5 504.51 20.18055 252.256875 20.18055 252.256875 40.36 504.51
ANDAMIO METALICO día 23.4 15 351 11.7 175.5 11.7 175.5 23.40 351.00
ANDAMIO METALICO hm 968.78 1.25 1210.98 484.39 605.4875 484.39 605.4875 968.78 1,210.98
PLUMA H=12 M. hm 28.8 84.75 2440.8 14.4 1220.4 14.4 1220.4 28.80 2,440.80
MANGUERA PARA AGUA und 2.0394 40 81.58 1.0197 40.788 1.0197 40.788 2.04 81.58
CORDEL rll 1.2263 10 12.26 0.61315 6.1315 0.61315 6.1315 1.23 12.26
COMPRESORA DE AIRE DE 2.5HP (INC. PISTOLA DE PINTAR Y MAGUERA DE PRESION) hm 72.32 7.5 542.4 0 72.32 542.4 72.32 542.40
TOTAL EQUIPOS 20641.07 8,555.30 8,291.17 3,794.60 20,641.07
SC INSTALACION DE GRASS SINTETICO PARA CAMPO DEPORTIVO (INCLUYE TODOS LOS m2
INSUMOS) 672 45 30240 672 30240 672.00 30,240.00
SC APROVISIONAMIENTO DE GRASS SINTETICO PARA CAMPO DEPORTIVO ENTRE 12000-17000
m2 HEBRAS (INCLUYE
672 TODOS LOS
55 INSUMOS) 36960 672 36960 672.00 36,960.00
SC SERVICIO DE INSTALACION Y APROVIONAMIENTO DE LA ILUMINACION DEL CAMPO DEPORTIVO
glb A TODO COSTO
1 16500 16500 1 16500 1.00 16,500.00
SUBCONTRATOS
SC SERVICIO DE INSTALACION DE SUMINISTRO MONOFÁSICO glb 1 420 420 1 420 1.00 420.00
SC PUERTA METALICA P-1 und 1 750 750 1 750 0 1.00 750.00
SC MURETE PARA SUMINISTRO ELECTRICO und 1 400 400 1 400 1.00 400.00
TOTAL SUBCONTRATOS 85270 0.00 750.00 84,520.00 85,270.00
TOTAL GENERAL 99,117.64 82,140.13 98,446.21 279,703.98