ITEM DESCRIPCION DE PARTIDAS

01.02.01.01 EXCAVACIONES
01.02.01.01.01 EXCAV. ZANJAS Y ZAPATA, Df=2.00m MANUAL
01.02.02.02 CIMIENTOS
01.02.02.02.01 CIMIENTO CORRIDO 1:10 + 30% P.G., CEMENTO TIPO MS
01.02.02.02.02 CIMIENTO CORRIDO - ENCOFRADO Y DESENCOFRADO
01.02.03 OBRAS DE CONCRETO ARMADO
01.02.03.01 ZAPATAS
01.02.03.01.01 ZAPATAS - CONCRETO f'c=210 kg/cm2, CEMENTO TIPO MS
01.02.03.01.02 ZAPATAS - ENCOFRADO Y DESENCOFRADO
01.02.03.01.03 ZAPATAS - ACERO Fy=4200 kg/cm2
01.02.03.03 SOBRECIMIENTO REFORZADO
01.02.03.03.01 SOBRECIMIENTO REFORZADO - CONCRETO f'c=175 kg/cm2, CEMENTO TIPO MS
01.02.03.03.03 SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESENCOFRADO NORMAL
01.02.03.03.04 SOBRECIMIENTO REFORZADO - ACERO Fy=4200 kg/cm2
01.02.03.05 COLUMNAS
01.02.03.05.01 COLUMNAS - CONCRETO f'c=175 kg/cm2, CEMENTO TIPO 1
01.02.03.05.03 COLUMNAS - ENCOFRADO Y DESENCOFRADO
01.02.03.05.04 COLUMNAS - ACERO Fy= 4200 KG/CM2
01.02.03.06 VIGAS
01.02.03.06.01 VIGAS - CONCRETO f'c=175 kg/cm2, CEMENTO TIPO 1
01.02.03.06.03 VIGAS - ENCOFRADO Y DESENCOFRADO
01.02.03.06.04 VIGAS - ACERO Fy= 4200 KG/CM2

2 ARQUITECTURA
2.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO DE CABEZA LADRILLO KING-KONG DE 18 HUECOS
02.01.02 MURO DE SOGA LADRILLO KING-KONG DE 18 HUECOS
2.02 REVOQUES Y ENLUCIDOS
02.02.02 TARRAJEO EN MURO INTERIOR, E=1.5CM, MEZCLA 1:5
02.02.03 TARRAJEO EN MURO EXTERIOR , E=1.5CM, MEZCLA 1:5
02.02.04 TARRAJEO EN COLUMNAS, E=1.5CM, MEZCLA 1:5
02.02.06 TARRAJEO EN VIGAS, E=1.5CM, MEZCLA 1:5
02.02.08 BRUÑAS E=1cm
02.11 PINTURA
02.11.05 PINTURA 02 MANOS EN VIGAS ACABADO EN LATEX
02.11.03 PINTURA 02 MANOS EN COLUMNAS ACABADO EN LATEX
02.11.06 PINTURA 02 MANOS EN MUROS EXTERIORES ACABADO OLEO MATE
5/27/2021

5/28/2021
5/29/2021
5/30/2021
5/31/2021
6/1/2021
6/2/2021
6/3/2021
6/4/2021
6/5/2021
% AVANCE EJECUTADO % AVANCE QUE FALTA

81.27% 18.73%

76.83% 23.17%
77.36% 22.64%

93.30% 6.70%
88.91% 11.09%
93.89% 6.11%

86.06% 13.94%
87.06% 12.94%
86.93% 13.07%

78.30% 21.70%
82.75% 17.25%
83.61% 16.39%

80.57% 19.43%
92.26% 7.74%
94.12% 5.88%

95.00% 5.00%
96.47% 3.53%
100.00%
67.66% 32.34%
68.35% 31.65%
69.70% 30.30%
57.58% 42.42%
46.25% 53.75%

97.37% 2.63%
96.56% 3.44%
89.69% 10.31%
6/6/2021
6/7/2021
6/8/2021
6/9/2021
6/10/2021
6/11/2021
6/12/2021
6/13/2021
6/14/2021
6/15/2021
6/16/2021
6/17/2021
6/18/2021
6/19/2021
6/20/2021
6/21/2021
6/22/2021
6/23/2021
PLAZO CONTRACTUAL DE EJECUCION E OBRA DESDE EL REINICIO

6/24/2021
EINICIO
6/25/2021
6/26/2021
6/27/2021
6/28/2021
6/29/2021
6/30/2021
7/1/2021
7/2/2021
7/3/2021
7/4/2021
7/5/2021
7/6/2021
7/7/2021
7/8/2021
7/9/2021
7/10/2021
7/11/2021