PREPUESUPUESTO DE PLANIFICACION PARA EL PERIODO 01/09/2021 AL 30/09/2021

METRADO COSTO
ITEM PARTIDA UNIDAD EXPEDIENTE METRADO META UNITARIO PPTO

12 SISTEMA DE ALCANTARILLADO
12.01 RED DE DESAGUE - COLECTORES PRIMARIOS
12.02.02 MOVIMIENTO DE TIERRAS
12.01.02.01 EXCAVACION C/EQUIPO T.NORMAL H=1.50M, P/TUB DN 200MM DESAGUE m 6,177.12 640.07 14.12 9,037.79

TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

ESCOABYA - SAN FRANCISCO


BZ 850@ BZ 851 h=1.20, h=1.40 30.27
BZ 851@ BZ 852 h=1.40, h=1.30 18.62
BZ _A_1@ BZ _A_2 h=1.50, h=1.50 35.29
BZ _A_2@ BZ _A_3 h=1.50, h=1.50 31.28
BZ _A_3@ BZ _A_4 h=1.50, h=1.20 26.83
BZ _A_4@ BZ _A_5 h=1.20, h=1.20 27.01
BZ _A_20@ BZ _A_21 h=1.36, h=1.20 16.88
BZ _A_21@ BZ _A_22 h=1.20, h=1.20 20.10
BZ _A_22@ BZ _A_23 h=1.20, h=1.20 31.21
BZ _A_23@ BZ _A_24 h=1.20, h=1.20 30.75
BZ _A_24@ BZ _A_25 h=1.20, h=1.20 12.44
BZ _A_25@ BZ _A_26 h=1.20, h=1.20 25.68
BZ _A_26@ BZ _A_27 h=1.20, h=1.30 5.60
BZ _A_27@ BZ _A_28 h=1.30, h=1.20 13.63
BZ _A_28@ BZ _A_28A h=1.20, h=1.45 24.19
BZ _A_28A@ BZ _A_29 h=1.45, h=1.30 18.66

12.01.02.04 EXCAVACION C/EQUIPO T.NORMAL H=2.00M, P/TUB DN 200MM DESAGUE m 4,770.76 100.82 18.01 1,815.77

ESCOABYA - SAN FRANCISCO


BZ 849@ BZ 850 h=1.60, h=1.20 10.92
BZ 852@ BZ 853 h=1.30, h=1.95 9.28
BZ 853@ BZ 854 h=1.95, h=1.60 11.28
BZ 854@ BZ 855 h=1.60, h=1.20 23.91
BZ _A_5@ BZ _A_7 h=1.20, h=1.80 45.43

12.01.02.04 EXCAVACION C/EQUIPO T.NORMAL H=2.50M, P/TUB DN 200MM DESAGUE 108.36 19.21 2,081.60

TAMAÑA
BZ 406_25 @ BZ 406_24 25.77
BZ 406_24 @ BZ 406_23 41.27

ESCOABYA - SAN FRANCISCO


BZ 846@ BZ 847 h=2.35, h=2.36 13.45
BZ 855@ BZ 856 h=1.20, h=2.44 27.87

12.01.02.10 EXCAVACION C/EQUIPO T.NORMAL H=3.00M, P/TUB DN 200MM DESAGUE m 1,507.77 161.58 20.60 3,328.55

TAMAÑA
BZ 406_12 @ BZ 406_13 13.70
ESCOBAYA - SAN FRANCISCO
BZ 840@ BZ 841 h=2.53, h=2.79 11.71
BZ 847@ BZ 848 h=2.36, h=2.65 34.97
BZ 848@ BZ 849 h=2.65, h=1.60 23.04
BZ _A_7@ BZ _A_9 h=1.80, h=2.51 28.34
BZ _A_9@ BZ _A_10 h=2.51, h=2.58 16.41
BZ _A_10@ BZ _A_11 h=2.58, h=2.70 22.65
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76

12.02.03.13 EXCAVACION C/EQUIPO T.NORMAL H=3.50M, P/TUB DN 200MM DESAGUE m 300.53 154.22 21.40 3,300.31

ESCOBAYA - SAN FRANCISCO


BZ 841@ BZ 842 h=2.79, h=3.28 20.95
BZ 842@ BZ 843 h=3.28, h=3.31 15.84
BZ 843@ BZ 844 h=3.31, h=3.30 28.04
BZ 844@ BZ 845 h=3.30, h=3.37 16.69
BZ 845@ BZ 846 h=3.37, h=2.35 20.55
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23

12.02.03.16 EXCAVACION C/EQUIPO T.NORMAL H=4.00M, P/TUB DN 200MM DESAGUE m 173.12 132.29 21.80 2,883.92

TAMAÑA
BZ 406_5 @ BZ 406_6 51.58
BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

12.02.03.19 EXCAVACION C/EQUIPO T.NORMAL H=4.50M, P/TUB DN 200MM DESAGUE m 258.20 20.66 22.26 459.89

ESCOBAYA - SAN FRANCISCO


BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84

12.02.03.22 EXCAVACION C/EQUIPO T.NORMAL H=5.00M, P/TUB DN 200MM DESAGUE m 156.33 125.28 24.22 3,034.28

ESCOBAYA - SAN FRANCISCO


BZ 859A@ BZ 859B h=3.86, h=4.53 43.76
BZ 859B @ BZ 860 h=4.53, h=4.55 19.09
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47

12.01.02.55 REFINE Y NIVELACION ZANJA T.NORMAL, P/DESAGUE m 17,490.58 1,500.44 2.79 4,186.23

TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

BZ 406_25 @ BZ 406_24 25.77


BZ 406_24 @ BZ 406_23 41.27

BZ 406_12 @ BZ 406_13 13.70

BZ 406_5 @ BZ 406_6 51.58


BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

ESCOBAYA - SAN FRANCISCO


BZ 850@ BZ 851 h=1.20, h=1.40 30.27
BZ 851@ BZ 852 h=1.40, h=1.30 18.62
BZ 849@ BZ 850 h=1.60, h=1.20 10.92
BZ 852@ BZ 853 h=1.30, h=1.95 9.28
BZ 853@ BZ 854 h=1.95, h=1.60 11.28
BZ 854@ BZ 855 h=1.60, h=1.20 23.91
BZ 846@ BZ 847 h=2.35, h=2.36 13.45
BZ 855@ BZ 856 h=1.20, h=2.44 27.87
BZ 856@ BZ 857 h=2.44, h=3.47 13.88
BZ 840@ BZ 841 h=2.53, h=2.79 11.71
BZ 847@ BZ 848 h=2.36, h=2.65 34.97
BZ 848@ BZ 849 h=2.65, h=1.60 23.04
BZ 841@ BZ 842 h=2.79, h=3.28 20.95
BZ 842@ BZ 843 h=3.28, h=3.31 15.84
BZ 843@ BZ 844 h=3.31, h=3.30 28.04
BZ 844@ BZ 845 h=3.30, h=3.37 16.69
BZ 845@ BZ 846 h=3.37, h=2.35 20.55
BZ 857@ BZ 858 h=3.47, h=3.98 15.42
BZ 858@ BZ 859 h=3.98, h=3.71 13.37
BZ 859@ BZ 859A h=3.71, h=3.86 14.49
BZ 859A@ BZ 859B h=3.86, h=4.53 43.76
BZ 859B @ BZ 860 h=4.53, h=4.55 19.09
BZ _A_1@ BZ _A_2 h=1.50, h=1.50 35.29
BZ _A_2@ BZ _A_3 h=1.50, h=1.50 31.28
BZ _A_3@ BZ _A_4 h=1.50, h=1.20 26.83
BZ _A_4@ BZ _A_5 h=1.20, h=1.20 27.01
BZ _A_20@ BZ _A_21 h=1.36, h=1.20 16.88
BZ _A_21@ BZ _A_22 h=1.20, h=1.20 20.10
BZ _A_22@ BZ _A_23 h=1.20, h=1.20 31.21
BZ _A_23@ BZ _A_24 h=1.20, h=1.20 30.75
BZ _A_24@ BZ _A_25 h=1.20, h=1.20 12.44
BZ _A_25@ BZ _A_26 h=1.20, h=1.20 25.68
BZ _A_26@ BZ _A_27 h=1.20, h=1.30 5.60
BZ _A_27@ BZ _A_28 h=1.30, h=1.20 13.63
BZ _A_28@ BZ _A_28A h=1.20, h=1.45 24.19
BZ _A_28A@ BZ _A_29 h=1.45, h=1.30 18.66
BZ _A_5@ BZ _A_7 h=1.20, h=1.80 45.43
BZ _A_7@ BZ _A_9 h=1.80, h=2.51 28.34
BZ _A_9@ BZ _A_10 h=2.51, h=2.58 16.41
BZ _A_10@ BZ _A_11 h=2.58, h=2.70 22.65
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47

12.01.02.58 CAMA DE ARENA EN ZANJA H=0.10M, A=0.60M m 18,219.35 1,500.44 7.09 10,638.12

TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

BZ 406_25 @ BZ 406_24 25.77


BZ 406_24 @ BZ 406_23 41.27

BZ 406_12 @ BZ 406_13 13.70

BZ 406_5 @ BZ 406_6 51.58


BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

ESCOBAYA - SAN FRANCISCO


BZ 850@ BZ 851 h=1.20, h=1.40 30.27
BZ 851@ BZ 852 h=1.40, h=1.30 18.62
BZ 849@ BZ 850 h=1.60, h=1.20 10.92
BZ 852@ BZ 853 h=1.30, h=1.95 9.28
BZ 853@ BZ 854 h=1.95, h=1.60 11.28
BZ 854@ BZ 855 h=1.60, h=1.20 23.91
BZ 846@ BZ 847 h=2.35, h=2.36 13.45
BZ 855@ BZ 856 h=1.20, h=2.44 27.87
BZ 856@ BZ 857 h=2.44, h=3.47 13.88
BZ 840@ BZ 841 h=2.53, h=2.79 11.71
BZ 847@ BZ 848 h=2.36, h=2.65 34.97
BZ 848@ BZ 849 h=2.65, h=1.60 23.04
BZ 841@ BZ 842 h=2.79, h=3.28 20.95
BZ 842@ BZ 843 h=3.28, h=3.31 15.84
BZ 843@ BZ 844 h=3.31, h=3.30 28.04
BZ 844@ BZ 845 h=3.30, h=3.37 16.69
BZ 845@ BZ 846 h=3.37, h=2.35 20.55
BZ 857@ BZ 858 h=3.47, h=3.98 15.42
BZ 858@ BZ 859 h=3.98, h=3.71 13.37
BZ 859@ BZ 859A h=3.71, h=3.86 14.49
BZ 859A@ BZ 859B h=3.86, h=4.53 43.76
BZ 859B @ BZ 860 h=4.53, h=4.55 19.09
BZ _A_1@ BZ _A_2 h=1.50, h=1.50 35.29
BZ _A_2@ BZ _A_3 h=1.50, h=1.50 31.28
BZ _A_3@ BZ _A_4 h=1.50, h=1.20 26.83
BZ _A_4@ BZ _A_5 h=1.20, h=1.20 27.01
BZ _A_20@ BZ _A_21 h=1.36, h=1.20 16.88
BZ _A_21@ BZ _A_22 h=1.20, h=1.20 20.10
BZ _A_22@ BZ _A_23 h=1.20, h=1.20 31.21
BZ _A_23@ BZ _A_24 h=1.20, h=1.20 30.75
BZ _A_24@ BZ _A_25 h=1.20, h=1.20 12.44
BZ _A_25@ BZ _A_26 h=1.20, h=1.20 25.68
BZ _A_26@ BZ _A_27 h=1.20, h=1.30 5.60
BZ _A_27@ BZ _A_28 h=1.30, h=1.20 13.63
BZ _A_28@ BZ _A_28A h=1.20, h=1.45 24.19
BZ _A_28A@ BZ _A_29 h=1.45, h=1.30 18.66
BZ _A_5@ BZ _A_7 h=1.20, h=1.80 45.43
BZ _A_7@ BZ _A_9 h=1.80, h=2.51 28.34
BZ _A_9@ BZ _A_10 h=2.51, h=2.58 16.41
BZ _A_10@ BZ _A_11 h=2.58, h=2.70 22.65
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47

12.01.02.59 RELLENO PROTECTOR C/MAT PROPIO P/TUB 200MM, H=0.30M m 18,219.35 1,500.44 5.35 8,027.35

TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

BZ 406_25 @ BZ 406_24 25.77


BZ 406_24 @ BZ 406_23 41.27

BZ 406_12 @ BZ 406_13 13.70

BZ 406_5 @ BZ 406_6 51.58


BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

ESCOBAYA - SAN FRANCISCO


BZ 850@ BZ 851 h=1.20, h=1.40 30.27
BZ 851@ BZ 852 h=1.40, h=1.30 18.62
BZ 849@ BZ 850 h=1.60, h=1.20 10.92
BZ 852@ BZ 853 h=1.30, h=1.95 9.28
BZ 853@ BZ 854 h=1.95, h=1.60 11.28
BZ 854@ BZ 855 h=1.60, h=1.20 23.91
BZ 846@ BZ 847 h=2.35, h=2.36 13.45
BZ 855@ BZ 856 h=1.20, h=2.44 27.87
BZ 856@ BZ 857 h=2.44, h=3.47 13.88
BZ 840@ BZ 841 h=2.53, h=2.79 11.71
BZ 847@ BZ 848 h=2.36, h=2.65 34.97
BZ 848@ BZ 849 h=2.65, h=1.60 23.04
BZ 841@ BZ 842 h=2.79, h=3.28 20.95
BZ 842@ BZ 843 h=3.28, h=3.31 15.84
BZ 843@ BZ 844 h=3.31, h=3.30 28.04
BZ 844@ BZ 845 h=3.30, h=3.37 16.69
BZ 845@ BZ 846 h=3.37, h=2.35 20.55
BZ 857@ BZ 858 h=3.47, h=3.98 15.42
BZ 858@ BZ 859 h=3.98, h=3.71 13.37
BZ 859@ BZ 859A h=3.71, h=3.86 14.49
BZ 859A@ BZ 859B h=3.86, h=4.53 43.76
BZ 859B @ BZ 860 h=4.53, h=4.55 19.09
BZ _A_1@ BZ _A_2 h=1.50, h=1.50 35.29
BZ _A_2@ BZ _A_3 h=1.50, h=1.50 31.28
BZ _A_3@ BZ _A_4 h=1.50, h=1.20 26.83
BZ _A_4@ BZ _A_5 h=1.20, h=1.20 27.01
BZ _A_20@ BZ _A_21 h=1.36, h=1.20 16.88
BZ _A_21@ BZ _A_22 h=1.20, h=1.20 20.10
BZ _A_22@ BZ _A_23 h=1.20, h=1.20 31.21
BZ _A_23@ BZ _A_24 h=1.20, h=1.20 30.75
BZ _A_24@ BZ _A_25 h=1.20, h=1.20 12.44
BZ _A_25@ BZ _A_26 h=1.20, h=1.20 25.68
BZ _A_26@ BZ _A_27 h=1.20, h=1.30 5.60
BZ _A_27@ BZ _A_28 h=1.30, h=1.20 13.63
BZ _A_28@ BZ _A_28A h=1.20, h=1.45 24.19
BZ _A_28A@ BZ _A_29 h=1.45, h=1.30 18.66
BZ _A_5@ BZ _A_7 h=1.20, h=1.80 45.43
BZ _A_7@ BZ _A_9 h=1.80, h=2.51 28.34
BZ _A_9@ BZ _A_10 h=2.51, h=2.58 16.41
BZ _A_10@ BZ _A_11 h=2.58, h=2.70 22.65
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47

12.01.02.60 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=1.50M m 6,434.50 640.07 3.81 2,438.67

TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

ESCOBAYA - SAN FRANCISCO


BZ 850@ BZ 851 h=1.20, h=1.40 30.27
BZ 851@ BZ 852 h=1.40, h=1.30 18.62
BZ _A_1@ BZ _A_2 h=1.50, h=1.50 35.29
BZ _A_2@ BZ _A_3 h=1.50, h=1.50 31.28
BZ _A_3@ BZ _A_4 h=1.50, h=1.20 26.83
BZ _A_4@ BZ _A_5 h=1.20, h=1.20 27.01
BZ _A_20@ BZ _A_21 h=1.36, h=1.20 16.88
BZ _A_21@ BZ _A_22 h=1.20, h=1.20 20.10
BZ _A_22@ BZ _A_23 h=1.20, h=1.20 31.21
BZ _A_23@ BZ _A_24 h=1.20, h=1.20 30.75
BZ _A_24@ BZ _A_25 h=1.20, h=1.20 12.44
BZ _A_25@ BZ _A_26 h=1.20, h=1.20 25.68
BZ _A_26@ BZ _A_27 h=1.20, h=1.30 5.60
BZ _A_27@ BZ _A_28 h=1.30, h=1.20 13.63
BZ _A_28@ BZ _A_28A h=1.20, h=1.45 24.19
BZ _A_28A@ BZ _A_29 h=1.45, h=1.30 18.66

12.01.02.61 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=2.00M m 4,969.54 100.82 6.25 630.13

ESCOBAYA - SAN FRANCISCO


BZ 849@ BZ 850 h=1.60, h=1.20 10.92
BZ 852@ BZ 853 h=1.30, h=1.95 9.28
BZ 853@ BZ 854 h=1.95, h=1.60 11.28
BZ 854@ BZ 855 h=1.60, h=1.20 23.91
BZ _A_5@ BZ _A_7 h=1.20, h=1.80 45.43

12.01.02.62 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=2.50M m 4,969.54 108.36 7.25 785.61

TAMAÑA
BZ 406_25 @ BZ 406_24 25.77
BZ 406_24 @ BZ 406_23 41.27

ESCOBAYA - SAN FRANCISCO


BZ 846@ BZ 847 h=2.35, h=2.36 13.45
BZ 855@ BZ 856 h=1.20, h=2.44 27.87

12.01.02.63 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=3.00M m 1,570.59 161.58 7.25 1,171.46

TAMAÑA
BZ 406_12 @ BZ 406_13 13.70

ESCOBAYA - SAN FRANCISCO


BZ 840@ BZ 841 h=2.53, h=2.79 11.71
BZ 847@ BZ 848 h=2.36, h=2.65 34.97
BZ 848@ BZ 849 h=2.65, h=1.60 23.04
BZ _A_7@ BZ _A_9 h=1.80, h=2.51 28.34
BZ _A_9@ BZ _A_10 h=2.51, h=2.58 16.41
BZ _A_10@ BZ _A_11 h=2.58, h=2.70 22.65
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76

12.01.02.64 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=3.50M m 1,570.59 154.22 5.84 900.64

ESCOBAYA - SAN FRANCISCO


BZ 841@ BZ 842 h=2.79, h=3.28 20.95
BZ 842@ BZ 843 h=3.28, h=3.31 15.84
BZ 843@ BZ 844 h=3.31, h=3.30 28.04
BZ 844@ BZ 845 h=3.30, h=3.37 16.69
BZ 845@ BZ 846 h=3.37, h=2.35 20.55
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23

12.01.02.65 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=4.00M m 463.77 57.16 7.80 445.85

TAMAÑA

BZ 406_5 @ BZ 406_6 51.58


BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

ESCOBAYA - SAN FRANCISCO


BZ 857@ BZ 858 h=3.47, h=3.98 15.42
BZ 858@ BZ 859 h=3.98, h=3.71 13.37
BZ 859@ BZ 859A h=3.71, h=3.86 14.49
BZ 856@ BZ 857 h=2.44, h=3.47 13.88

12.01.02.66 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=4.50M m 403.04 20.66 0.00
ESCOBAYA - SAN FRANCISCO
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84

12.01.02.67 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=5.00M m 123.78 125.28 8.87 1,111.23
ESCOBAYA - SAN FRANCISCO
BZ 859A@ BZ 859B h=3.86, h=4.53 43.76
BZ 859B @ BZ 860 h=4.53, h=4.55 19.09
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47

12.01.03 TUBERIA DE DESAGUE


12.01.03.01 SUMINISTRO DE TUBERIA ISO 4435 S-25 DN 200MM U/FLEXIBLE m 18,219.35 1,500.44 26.85 40,286.81
TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

BZ 406_25 @ BZ 406_24 25.77


BZ 406_24 @ BZ 406_23 41.27

BZ 406_12 @ BZ 406_13 13.70

BZ 406_5 @ BZ 406_6 51.58


BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

ESCOBAYA - SAN FRANCISCO


BZ 850@ BZ 851 h=1.20, h=1.40 30.27
BZ 851@ BZ 852 h=1.40, h=1.30 18.62
BZ 849@ BZ 850 h=1.60, h=1.20 10.92
BZ 852@ BZ 853 h=1.30, h=1.95 9.28
BZ 853@ BZ 854 h=1.95, h=1.60 11.28
BZ 854@ BZ 855 h=1.60, h=1.20 23.91
BZ 846@ BZ 847 h=2.35, h=2.36 13.45
BZ 855@ BZ 856 h=1.20, h=2.44 27.87
BZ 856@ BZ 857 h=2.44, h=3.47 13.88
BZ 840@ BZ 841 h=2.53, h=2.79 11.71
BZ 847@ BZ 848 h=2.36, h=2.65 34.97
BZ 848@ BZ 849 h=2.65, h=1.60 23.04
BZ 841@ BZ 842 h=2.79, h=3.28 20.95
BZ 842@ BZ 843 h=3.28, h=3.31 15.84
BZ 843@ BZ 844 h=3.31, h=3.30 28.04
BZ 844@ BZ 845 h=3.30, h=3.37 16.69
BZ 845@ BZ 846 h=3.37, h=2.35 20.55
BZ 857@ BZ 858 h=3.47, h=3.98 15.42
BZ 858@ BZ 859 h=3.98, h=3.71 13.37
BZ 859@ BZ 859A h=3.71, h=3.86 14.49
BZ 859A@ BZ 859B h=3.86, h=4.53 43.76
BZ 859B @ BZ 860 h=4.53, h=4.55 19.09
BZ _A_1@ BZ _A_2 h=1.50, h=1.50 35.29
BZ _A_2@ BZ _A_3 h=1.50, h=1.50 31.28
BZ _A_3@ BZ _A_4 h=1.50, h=1.20 26.83
BZ _A_4@ BZ _A_5 h=1.20, h=1.20 27.01
BZ _A_20@ BZ _A_21 h=1.36, h=1.20 16.88
BZ _A_21@ BZ _A_22 h=1.20, h=1.20 20.10
BZ _A_22@ BZ _A_23 h=1.20, h=1.20 31.21
BZ _A_23@ BZ _A_24 h=1.20, h=1.20 30.75
BZ _A_24@ BZ _A_25 h=1.20, h=1.20 12.44
BZ _A_25@ BZ _A_26 h=1.20, h=1.20 25.68
BZ _A_26@ BZ _A_27 h=1.20, h=1.30 5.60
BZ _A_27@ BZ _A_28 h=1.30, h=1.20 13.63
BZ _A_28@ BZ _A_28A h=1.20, h=1.45 24.19
BZ _A_28A@ BZ _A_29 h=1.45, h=1.30 18.66
BZ _A_5@ BZ _A_7 h=1.20, h=1.80 45.43
BZ _A_7@ BZ _A_9 h=1.80, h=2.51 28.34
BZ _A_9@ BZ _A_10 h=2.51, h=2.58 16.41
BZ _A_10@ BZ _A_11 h=2.58, h=2.70 22.65
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47

12.01.03.02 INSTALACION DE TUBERIA ISO 4435 S-25 DN=200MM m 18,219.35 1,500.44 4.28 6,421.88

TAMAÑA

BZ 406 @ BZ 406_4 25.25


BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

BZ 406_25 @ BZ 406_24 25.77


BZ 406_24 @ BZ 406_23 41.27
BZ 406_12 @ BZ 406_13 13.70

BZ 406_5 @ BZ 406_6 51.58


BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

ESCOBAYA - SAN FRANCISCO


BZ 850@ BZ 851 h=1.20, h=1.40 30.27
BZ 851@ BZ 852 h=1.40, h=1.30 18.62
BZ 849@ BZ 850 h=1.60, h=1.20 10.92
BZ 852@ BZ 853 h=1.30, h=1.95 9.28
BZ 853@ BZ 854 h=1.95, h=1.60 11.28
BZ 854@ BZ 855 h=1.60, h=1.20 23.91
BZ 846@ BZ 847 h=2.35, h=2.36 13.45
BZ 855@ BZ 856 h=1.20, h=2.44 27.87
BZ 856@ BZ 857 h=2.44, h=3.47 13.88
BZ 840@ BZ 841 h=2.53, h=2.79 11.71
BZ 847@ BZ 848 h=2.36, h=2.65 34.97
BZ 848@ BZ 849 h=2.65, h=1.60 23.04
BZ 841@ BZ 842 h=2.79, h=3.28 20.95
BZ 842@ BZ 843 h=3.28, h=3.31 15.84
BZ 843@ BZ 844 h=3.31, h=3.30 28.04
BZ 844@ BZ 845 h=3.30, h=3.37 16.69
BZ 845@ BZ 846 h=3.37, h=2.35 20.55
BZ 857@ BZ 858 h=3.47, h=3.98 15.42
BZ 858@ BZ 859 h=3.98, h=3.71 13.37
BZ 859@ BZ 859A h=3.71, h=3.86 14.49
BZ 859A@ BZ 859B h=3.86, h=4.53 43.76
BZ 859B @ BZ 860 h=4.53, h=4.55 19.09
BZ _A_1@ BZ _A_2 h=1.50, h=1.50 35.29
BZ _A_2@ BZ _A_3 h=1.50, h=1.50 31.28
BZ _A_3@ BZ _A_4 h=1.50, h=1.20 26.83
BZ _A_4@ BZ _A_5 h=1.20, h=1.20 27.01
BZ _A_20@ BZ _A_21 h=1.36, h=1.20 16.88
BZ _A_21@ BZ _A_22 h=1.20, h=1.20 20.10
BZ _A_22@ BZ _A_23 h=1.20, h=1.20 31.21
BZ _A_23@ BZ _A_24 h=1.20, h=1.20 30.75
BZ _A_24@ BZ _A_25 h=1.20, h=1.20 12.44
BZ _A_25@ BZ _A_26 h=1.20, h=1.20 25.68
BZ _A_26@ BZ _A_27 h=1.20, h=1.30 5.60
BZ _A_27@ BZ _A_28 h=1.30, h=1.20 13.63
BZ _A_28@ BZ _A_28A h=1.20, h=1.45 24.19
BZ _A_28A@ BZ _A_29 h=1.45, h=1.30 18.66
BZ _A_5@ BZ _A_7 h=1.20, h=1.80 45.43
BZ _A_7@ BZ _A_9 h=1.80, h=2.51 28.34
BZ _A_9@ BZ _A_10 h=2.51, h=2.58 16.41
BZ _A_10@ BZ _A_11 h=2.58, h=2.70 22.65
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47

12.01.03.03 PRUEBA HIDRAULICA PARCIAL A ZANJA DESCUBIERTA DE TUBERIA PVC/ISO 4435 m 18,219.35 1,500.44 1.99 2,985.88

TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

BZ 406_25 @ BZ 406_24 25.77


BZ 406_24 @ BZ 406_23 41.27

BZ 406_12 @ BZ 406_13 13.70

BZ 406_5 @ BZ 406_6 51.58


BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

ESCOBAYA - SAN FRANCISCO


BZ 850@ BZ 851 h=1.20, h=1.40 30.27
BZ 851@ BZ 852 h=1.40, h=1.30 18.62
BZ 849@ BZ 850 h=1.60, h=1.20 10.92
BZ 852@ BZ 853 h=1.30, h=1.95 9.28
BZ 853@ BZ 854 h=1.95, h=1.60 11.28
BZ 854@ BZ 855 h=1.60, h=1.20 23.91
BZ 846@ BZ 847 h=2.35, h=2.36 13.45
BZ 855@ BZ 856 h=1.20, h=2.44 27.87
BZ 856@ BZ 857 h=2.44, h=3.47 13.88
BZ 840@ BZ 841 h=2.53, h=2.79 11.71
BZ 847@ BZ 848 h=2.36, h=2.65 34.97
BZ 848@ BZ 849 h=2.65, h=1.60 23.04
BZ 841@ BZ 842 h=2.79, h=3.28 20.95
BZ 842@ BZ 843 h=3.28, h=3.31 15.84
BZ 843@ BZ 844 h=3.31, h=3.30 28.04
BZ 844@ BZ 845 h=3.30, h=3.37 16.69
BZ 845@ BZ 846 h=3.37, h=2.35 20.55
BZ 857@ BZ 858 h=3.47, h=3.98 15.42
BZ 858@ BZ 859 h=3.98, h=3.71 13.37
BZ 859@ BZ 859A h=3.71, h=3.86 14.49
BZ 859A@ BZ 859B h=3.86, h=4.53 43.76
BZ 859B @ BZ 860 h=4.53, h=4.55 19.09
BZ _A_1@ BZ _A_2 h=1.50, h=1.50 35.29
BZ _A_2@ BZ _A_3 h=1.50, h=1.50 31.28
BZ _A_3@ BZ _A_4 h=1.50, h=1.20 26.83
BZ _A_4@ BZ _A_5 h=1.20, h=1.20 27.01
BZ _A_20@ BZ _A_21 h=1.36, h=1.20 16.88
BZ _A_21@ BZ _A_22 h=1.20, h=1.20 20.10
BZ _A_22@ BZ _A_23 h=1.20, h=1.20 31.21
BZ _A_23@ BZ _A_24 h=1.20, h=1.20 30.75
BZ _A_24@ BZ _A_25 h=1.20, h=1.20 12.44
BZ _A_25@ BZ _A_26 h=1.20, h=1.20 25.68
BZ _A_26@ BZ _A_27 h=1.20, h=1.30 5.60
BZ _A_27@ BZ _A_28 h=1.30, h=1.20 13.63
BZ _A_28@ BZ _A_28A h=1.20, h=1.45 24.19
BZ _A_28A@ BZ _A_29 h=1.45, h=1.30 18.66
BZ _A_5@ BZ _A_7 h=1.20, h=1.80 45.43
BZ _A_7@ BZ _A_9 h=1.80, h=2.51 28.34
BZ _A_9@ BZ _A_10 h=2.51, h=2.58 16.41
BZ _A_10@ BZ _A_11 h=2.58, h=2.70 22.65
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47

12.01.03.04 PRUEBA HIDRAULICA FINAL A ZANJA TAPADA DE TUBERIA PVC/ISO 4435 DN=200MM m 18,219.35 1,015.78 1.99 2,021.40

TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

BZ 406_25 @ BZ 406_24 25.77


BZ 406_24 @ BZ 406_23 41.27

BZ 406_12 @ BZ 406_13 13.70

BZ 406_5 @ BZ 406_6 51.58


BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

ESCOBAYA - SAN FRANCISCO


BZ 850@ BZ 851 h=1.20, h=1.40 30.27
BZ 851@ BZ 852 h=1.40, h=1.30 18.62
BZ 849@ BZ 850 h=1.60, h=1.20 10.92
BZ 852@ BZ 853 h=1.30, h=1.95 9.28
BZ 853@ BZ 854 h=1.95, h=1.60 11.28
BZ 854@ BZ 855 h=1.60, h=1.20 23.91
BZ 846@ BZ 847 h=2.35, h=2.36 13.45
BZ 855@ BZ 856 h=1.20, h=2.44 27.87
BZ 856@ BZ 857 h=2.44, h=3.47 13.88
BZ 840@ BZ 841 h=2.53, h=2.79 11.71
BZ 847@ BZ 848 h=2.36, h=2.65 34.97
BZ 848@ BZ 849 h=2.65, h=1.60 23.04
BZ 841@ BZ 842 h=2.79, h=3.28 20.95
BZ 842@ BZ 843 h=3.28, h=3.31 15.84
BZ 843@ BZ 844 h=3.31, h=3.30 28.04
BZ 844@ BZ 845 h=3.30, h=3.37 16.69
BZ 845@ BZ 846 h=3.37, h=2.35 20.55
BZ 857@ BZ 858 h=3.47, h=3.98 15.42
BZ 858@ BZ 859 h=3.98, h=3.71 13.37
BZ 859@ BZ 859A h=3.71, h=3.86 14.49
BZ 859A@ BZ 859B h=3.86, h=4.53 43.76
BZ 859B @ BZ 860 h=4.53, h=4.55 19.09
BZ _A_1@ BZ _A_2 h=1.50, h=1.50 35.29
BZ _A_2@ BZ _A_3 h=1.50, h=1.50 31.28
BZ _A_3@ BZ _A_4 h=1.50, h=1.20 26.83
BZ _A_4@ BZ _A_5 h=1.20, h=1.20 27.01
BZ _A_20@ BZ _A_21 h=1.36, h=1.20 16.88
BZ _A_21@ BZ _A_22 h=1.20, h=1.20 20.10
BZ _A_22@ BZ _A_23 h=1.20, h=1.20 31.21
BZ _A_23@ BZ _A_24 h=1.20, h=1.20 30.75
BZ _A_24@ BZ _A_25 h=1.20, h=1.20 12.44
BZ _A_25@ BZ _A_26 h=1.20, h=1.20 25.68
BZ _A_26@ BZ _A_27 h=1.20, h=1.30 5.60
BZ _A_27@ BZ _A_28 h=1.30, h=1.20 13.63
BZ _A_28@ BZ _A_28A h=1.20, h=1.45 24.19
BZ _A_28A@ BZ _A_29 h=1.45, h=1.30 18.66
BZ _A_5@ BZ _A_7 h=1.20, h=1.80 45.43
BZ _A_7@ BZ _A_9 h=1.80, h=2.51 28.34
BZ _A_9@ BZ _A_10 h=2.51, h=2.58 16.41
BZ _A_10@ BZ _A_11 h=2.58, h=2.70 22.65
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47

12.01.04 EXCAVACIONES DE BUZONES

12.01.04.01 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=1.50M und 281.00 29.00 118.11 3,425.19

TAMAÑA
BZ - 406-B h =1.40 1.00
BZ - 407 h =1.40 1.00
BZ - 408 h =1.30 1.00
BZ - 409 h =1.30 1.00
BZ - 410 h =1.20 1.00
BZ - 411 h =1.20 1.00
BZ - 412-A h =1.50 1.00
BZ - 412 h =1.50 1.00
BZ - 413 h =1.30 1.00
BZ - 414 h =1.50 1.00
BZ - 415 h =1.30 1.00
BZ - 416 h =1.50 1.00
BZ - 417 h =1.50 1.00
BZ - 418 h =1.40 1.00
BZ - 419 h =1.25 1.00
BZ - 420 h =1.35 1.00
BZ - 406_19 h =1.20 1.00
BZ - 406_20 h =1.20 1.00
BZ - 406_21 h =1.20 1.00
BZ - 406_22 h =1.20 1.00
BZ - 406_23 h =1.21 1.00
BZ - 406_25 h =1.20 1.00
BZ - 406_26 h =1.20 1.00
BZ - 406_27 h =1.20 1.00
BZ - 406_28 h =1.20 1.00

ESCOBAYA - SAN FRANCISCO


BZ - 850 h =1.20 1.00
BZ - 851 h =1.40 1.00
BZ - 852 h =1.30 1.00
BZ - 855 h =1.20 1.00

12.01.04.02 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=2.00M und 108.00 3.00 128.83 386.49

ESCOBAYA - SAN FRANCISCO


BZ - 849 h =1.60 1.00
BZ - 853 h =1.95 1.00
BZ - 854 h =1.60 1.00

12.01.04.03 EXCAVACION BUZON, Dexc.=2.01M, HASTA H=2.50M und 59.00 4.00 141.74 566.96

TAMAÑA
BZ - 406_24 h =2.20 1.00

ESCOBAYA - SAN FRANCISCO


BZ - 846 h =2.35 1.00
BZ - 847 h =2.36 1.00
BZ - 856 h =2.44 1.00

12.01.04.04 EXCAVACION BUZON, Dexc.=2.50M, HASTA H=3.00M und 25.00 4.00 157.48 629.92

ESCOBAYA - SAN FRANCISCO


BZ - 840 h =2.53 1.00
BZ - 841 h =2.79 1.00
BZ - 848 h =2.65 1.00
BZ - 842 h =3.28 1.00

12.01.04.05 EXCAVACION BUZON, Dexc.=1.90M, HASTA H=3.50M und 20.00 8.00 3,543.40 28,347.20

ESCOBAYA - SAN FRANCISCO


BZ - 843 h =3.31 1.00
BZ - 844 h =3.30 1.00
BZ - 845 h =3.37 1.00
BZ - 857 h =3.47 1.00
BZ - A-13 h =3.39 1.00
BZ - A-14 h =3.41 1.00
BZ - A-15 h =3.44 1.00
BZ - A-19 h =3.33 1.00

12.01.04.06 EXCAVACION BUZON, Dexc.=1.90M, HASTA H=4.00M und 14.00 3.00 2,833.60 8,500.80

ESCOBAYA - SAN FRANCISCO


BZ - 858 h =3.98 1.00
BZ - 859 h =3.71 1.00
BZ - 859A h =3.86 1.00

12.01.04.07 EXCAVACION BUZON, Dexc.=1.90M, HASTA H=4.50M und 11.00 5.00 2,598.42 12,992.10

ESCOBAYA - SAN FRANCISCO


BZ - 859B h =4.53 1.00
BZ - 860 h =4.55 1.00
BZ - A-16 h =6.64 1.00
BZ - A-17 h =7.47 1.00
BZ - A-18 h =4.25 1.00

12.01.05 CONSTRUCCION DE BUZONES


12.01.05.01 CONSTRUCCION DE BUZONES DN=1.20M, H=1.2 @1.50m und 281.00 29.00 1,453.31 42,145.99

TAMAÑA COGRI
BZ - 406-B h =1.40 1.00
BZ - 407 h =1.40 1.00
BZ - 408 h =1.30 1.00
BZ - 409 h =1.30 1.00
BZ - 410 h =1.20 1.00
BZ - 411 h =1.20 1.00
BZ - 412-A h =1.50 1.00
BZ - 412 h =1.50 1.00
BZ - 413 h =1.30 1.00
BZ - 414 h =1.50 1.00
BZ - 415 h =1.30 1.00
BZ - 416 h =1.50 1.00
BZ - 417 h =1.50 1.00
BZ - 418 h =1.40 1.00
BZ - 419 h =1.25 1.00
BZ - 420 h =1.35 1.00
BZ - 406_19 h =1.20 1.00
BZ - 406_20 h =1.20 1.00
BZ - 406_21 h =1.20 1.00
BZ - 406_22 h =1.20 1.00
BZ - 406_23 h =1.21 1.00
BZ - 406_25 h =1.20 1.00
BZ - 406_26 h =1.20 1.00
BZ - 406_27 h =1.20 1.00
BZ - 406_28 h =1.20 1.00

ESCOBAYA - SAN FRANCISCO


BZ - 850 h =1.20 1.00
BZ - 851 h =1.40 1.00
BZ - 852 h =1.30 1.00
BZ - 855 h =1.20 1.00

12.01.05.02 CONSTRUCCION DE BUZONES DN=1.20M, H=1.51 @2.00m und 108.00 3.00 1,669.55 5,008.65

ESCOBAYA - SAN FRANCISCO


BZ - 849 h =1.60 1.00
BZ - 853 h =1.95 1.00
BZ - 854 h =1.60 1.00

12.01.05.03 CONSTRUCCION DE BUZONES DN=1.20M, H=2.01 @2.50m und 59.00 4.00 1,646.94 6,587.76

TAMAÑA
BZ - 406_24 h =2.20 1.00

ESCOBAYA - SAN FRANCISCO


BZ - 846 h =2.35 1.00
BZ - 847 h =2.36 1.00
BZ - 856 h =2.44 1.00

12.01.05.04 CONSTRUCCION DE BUZONES DN=1.20M, H=2.51 @3.00m und 25.00 5.00 1,951.04 9,755.20
ESCOBAYA - SAN FRANCISCO
BZ - 840 h =2.53 1.00
BZ - 841 h =2.79 1.00
BZ - 848 h =2.65 1.00
BZ - 842 h =3.28 1.00
BZ A -12 h =2.88 1.00

12.01.05.05 CONSTRUCCION DE BUZONES DN=1.50M, H=3.01 @3.50m und 20.00 8.00 3,296.84 26,374.72

ESCOBAYA - SAN FRANCISCO


BZ - 843 h =3.31 1.00
BZ - 844 h =3.30 1.00
BZ - 845 h =3.37 1.00
BZ - 857 h =3.47 1.00
BZ - A-13 h =3.39 1.00
BZ - A-14 h =3.41 1.00
BZ - A-15 h =3.44 1.00
BZ - A-19 h =3.33 1.00

12.01.05.06 CONSTRUCCION DE BUZONES DN=1.50M, H=3.51 @4.00m und 14.00 3.00 3,526.15 10,578.45

ESCOBAYA - SAN FRANCISCO


BZ - 858 h =3.98 1.00
BZ - 859 h =3.71 1.00
BZ - 859A h =3.86 1.00

12.01.05.07 CONSTRUCCION DE BUZONES DN=1.50M, H=4.01 @4.50m und 11.00 5.00 3,683.83 18,419.15

ESCOBAYA - SAN FRANCISCO


BZ - 859B h =4.53 1.00
BZ - 860 h =4.55 1.00
BZ - A-16 h =6.64 1.00
BZ - A-17 h =7.47 1.00
BZ - A-18 h =4.25 1.00

12.01.05.16 ANCLAJE O DADOS DE CONCRETO F´c=140KG/CM2 EN BUZONES und 1,104.00 #REF! 29.05 #REF!

12.02 RED DE DESAGUE - COLECTORES SECUNDARIOS


12.02.03 MOVIMIENTO DE TIERRAS
12.02.03.01 EXCAVACION C/EQUIPO T.NORMAL H=1.50M, P/TUB DN 200MM DESAGUE m 12,839.66 1,268.80 14.12 17,915.46

TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20 11.89
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20 14.39
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20 18.52
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20 23.92
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20 11.76
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40 8.57
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40 21.43
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20 11.08
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20 23.06
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20 13.74
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20 20.47
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20 10.29
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20 27.08
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20 16.70
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20 70.08
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20 26.16
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20 11.14
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20 43.67
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20 31.69
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20 37.29
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40 36.96
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 65.61
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 32.93
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.73

12.02.03.04 EXCAVACION C/EQUIPO T.NORMAL H=2.00M, P/TUB DN 200MM DESAGUE m 3,277.18 59.95 18.01 1,079.70

TAMAÑA
BZ_D @ BZ_E 24.89
BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

12.02.03.07 EXCAVACION C/EQUIPO T.NORMAL H=2.50M, P/TUB DN 200MM DESAGUE m 1,795.40 0.00 19.21 0.00

12.02.03.10 EXCAVACION C/EQUIPO T.NORMAL H=3.00M, P/TUB DN 200MM DESAGUE m 1,085.93 237.23 20.60 4,886.94

TAMAÑA
BZ_G @ BZ_H 34.73
BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

CHICHILIN
BZCHI 70 @ BZCHI 71 h=2.70, h=2.00 19.35
BZCHI 71 @ BZCHI 72 h=2.00, h=2.70 40.64
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70 30.88
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20 60.05

12.02.03.13 EXCAVACION C/EQUIPO T.NORMAL H=3.50M, P/TUB DN 200MM DESAGUE m 1,085.93 89.78 21.40 1,921.29

CHICHILIN
BZCHI 68 @ BZCHI 69 h=1.20, h=3.40 28.07
BZCHI 69 @ BZCHI 70 h=3.40, h=2.70 17.89
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10 27.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20 16.72

12.02.03.35 REFINE Y NIVELACION ZANJA T.NORMAL, P/DESAGUE m 20,074.25 1,655.76 2.79 4,619.57

TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

BZ_D @ BZ_E 24.89


BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

BZ_G @ BZ_H 34.73


BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20 11.89
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20 14.39
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20 18.52
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20 23.92
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20 11.76
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40 8.57
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40 21.43
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20 11.08
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20 23.06
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20 13.74
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20 20.47
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20 10.29
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20 27.08
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20 16.70
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20 70.08
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20 26.16
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20 11.14
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20 43.67
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20 31.69
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20 37.29
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40 36.96
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 65.61
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 32.93
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.73

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00 19.35


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70 40.64
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70 30.88
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20 60.05

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40 28.07


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70 17.89
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10 27.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20 16.72

12.02.03.38 CAMA DE ARENA EN ZANJA H=0.10M, A=0.60M m 28,677.50 1,655.76 7.09 11,739.34

TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

BZ_D @ BZ_E 24.89


BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

BZ_G @ BZ_H 34.73


BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20 11.89
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20 14.39
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20 18.52
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20 23.92
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20 11.76
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40 8.57
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40 21.43
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20 11.08
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20 23.06
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20 13.74
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20 20.47
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20 10.29
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20 27.08
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20 16.70
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20 70.08
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20 26.16
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20 11.14
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20 43.67
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20 31.69
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20 37.29
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40 36.96
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 65.61
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 32.93
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.73

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00 19.35


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70 40.64
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70 30.88
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20 60.05

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40 28.07


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70 17.89
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10 27.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20 16.72

12.02.03.39 RELLENO PROTECTOR C/MAT PROPIO P/TUB 200MM, H=0.30M m 28,677.50 1,655.76 5.35 8,858.32

TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62
BZ_D @ BZ_E 24.89
BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

BZ_G @ BZ_H 34.73


BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20 11.89
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20 14.39
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20 18.52
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20 23.92
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20 11.76
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40 8.57
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40 21.43
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20 11.08
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20 23.06
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20 13.74
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20 20.47
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20 10.29
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20 27.08
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20 16.70
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20 70.08
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20 26.16
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20 11.14
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20 43.67
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20 31.69
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20 37.29
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40 36.96
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 65.61
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 32.93
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.73

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00 19.35


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70 40.64
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70 30.88
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20 60.05

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40 28.07


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70 17.89
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10 27.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20 16.72

12.02.03.40 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=1.50M m 18,342.37 1,268.80 3.81 4,834.13

TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20 11.89
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20 14.39
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20 18.52
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20 23.92
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20 11.76
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40 8.57
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40 21.43
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20 11.08
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20 23.06
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20 13.74
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20 20.47
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20 10.29
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20 27.08
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20 16.70
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20 70.08
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20 26.16
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20 11.14
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20 43.67
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20 31.69
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20 37.29
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40 36.96
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 65.61
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 32.93
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.73

12.02.03.41 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=2.00M m 4,681.68 59.95 6.25 374.69

TAMAÑA
BZ_D @ BZ_E 24.89
BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

12.02.03.42 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=2.50M m 2,564.85 0.00 7.25 0.00

12.02.03.43 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=3.00M m 1,551.33 237.23 7.25 1,719.92

TAMAÑA
BZ_G @ BZ_H 34.73
BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

CHICHILIN
BZCHI 70 @ BZCHI 71 h=2.70, h=2.00 19.35
BZCHI 71 @ BZCHI 72 h=2.00, h=2.70 40.64
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70 30.88
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20 60.05

12.02.03.43 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=3.50M m 89.78

CHICHILIN
BZCHI 68 @ BZCHI 69 h=1.20, h=3.40 28.07
BZCHI 69 @ BZCHI 70 h=3.40, h=2.70 17.89
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10 27.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20 16.72

12.02.04 TUBERIA DE DESAGUE


12.02.04.01 SUMINISTRO DE TUBERIA ISO 4435 S-25 DN 200MM U/FLEXIBLE m 28,677.50 1,655.76 26.85 44,457.16

TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

BZ_D @ BZ_E 24.89


BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

BZ_G @ BZ_H 34.73


BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20 11.89
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20 14.39
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20 18.52
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20 23.92
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20 11.76
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40 8.57
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40 21.43
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20 11.08
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20 23.06
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20 13.74
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20 20.47
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20 10.29
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20 27.08
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20 16.70
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20 70.08
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20 26.16
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20 11.14
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20 43.67
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20 31.69
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20 37.29
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40 36.96
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 65.61
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 32.93
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.73

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00 19.35


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70 40.64
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70 30.88
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20 60.05

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40 28.07


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70 17.89
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10 27.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20 16.72

12.02.04.02 INSTALACION DE TUBERIA ISO 4435 S-25 DN=200MM m 28,677.50 1,655.76 4.28 7,086.65

TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

BZ_D @ BZ_E 24.89


BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

BZ_G @ BZ_H 34.73


BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20 11.89
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20 14.39
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20 18.52
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20 23.92
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20 11.76
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40 8.57
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40 21.43
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20 11.08
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20 23.06
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20 13.74
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20 20.47
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20 10.29
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20 27.08
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20 16.70
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20 70.08
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20 26.16
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20 11.14
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20 43.67
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20 31.69
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20 37.29
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40 36.96
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 65.61
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 32.93
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.73

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00 19.35


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70 40.64
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70 30.88
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20 60.05

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40 28.07


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70 17.89
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10 27.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20 16.72

12.02.04.03 PRUEBA HIDRAULICA PARCIAL A ZANJA DESCUBIERTA DE TUBERIA PVC/ISO 4435 m 28,677.50 1,655.76 1.99 3,294.96

TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

BZ_D @ BZ_E 24.89


BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

BZ_G @ BZ_H 34.73


BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20 11.89
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20 14.39
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20 18.52
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20 23.92
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20 11.76
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40 8.57
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40 21.43
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20 11.08
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20 23.06
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20 13.74
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20 20.47
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20 10.29
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20 27.08
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20 16.70
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20 70.08
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20 26.16
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20 11.14
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20 43.67
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20 31.69
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20 37.29
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40 36.96
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 65.61
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 32.93
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.73

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00 19.35


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70 40.64
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70 30.88
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20 60.05

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40 28.07


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70 17.89
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10 27.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20 16.72

12.02.04.04 PRUEBA HIDRAULICA FINAL A ZANJA TAPADA DE TUBERIA PVC/ISO 4435 DN=200MM m 28,677.50 1,655.76 1.99 3,294.96

TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

BZ_D @ BZ_E 24.89


BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

BZ_G @ BZ_H 34.73


BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20 11.89
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20 14.39
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20 18.52
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20 23.92
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20 11.76
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40 8.57
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40 21.43
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20 11.08
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20 23.06
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20 13.74
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20 20.47
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20 10.29
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20 27.08
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20 16.70
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20 70.08
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20 26.16
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20 11.14
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20 43.67
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20 31.69
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20 37.29
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40 36.96
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 65.61
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 32.93
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.73

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00 19.35


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70 40.64
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70 30.88
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20 60.05

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40 28.07


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70 17.89
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10 27.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20 16.72

12.02.05 EXCAVACION DE BUZONES


12.02.05.01 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=1.50M und 537.00 87.00 118.11 10,275.57

TAMAÑA
BZ-459 h=1.38 1.00
BZ-458 h=1.25 1.00
BZ-457 h=1.50 1.00
BZ-456 h=1.40 1.00
BZ-H h=1.40 1.00
BZ-E h=1.40 1.00
BZ-B h=1.20 1.00
BZ-A h=1.20 1.00
COGRI
BZ-24 h=1.20 1.00
BZ-25 h=1.20 1.00
BZ-27 h=1.30 1.00
BZ-33 h=1.30 1.00
BZ-33A h=1.20 1.00
BZ-34 h=1.40 1.00
BZ-129 h=1.50 1.00
BZ-28 h=1.4 1.00
BZ-35A h=1.5 1.00
BZ-36 h=1.4 1.00
BZ-127 h=1.4 1.00
BZ-128 h=1.4 1.00
BZ-38 h=1.5 1.00
BZ-39 h=1.5 1.00
BZ-40 h=1.4 1.00
BZ-41 h=1.3 1.00
BZ-36 h=1.30 1.00
BZ-42 h=1.2 1.00
BZ-32 h=1.2 1.00
BZ-31 h=1.3 1.00
BZ-45 h=1.2 1.00
BZ-44 h=1.4 1.00
BZ-46 h=1.3 1.00
BZ-47 h=1.2 1.00
BZ-48 h=1.2 1.00
BZ-125 h=1.2 1.00
BZ-49 h=1.4 1.00
BZ-49A h=1.4 1.00
BZ-50 h=1.4 1.00
BZ-51 h=1.40 1.00
BZ-52 h=1.50 1.00
BZ-53 h=1.20 1.00
BZ-61 h=1.30 1.00
BZ-133 h=1.30 1.00
BZ-62 h=1.30 1.00
BZ-63 h=1.50 1.00
BZ-65 h=1.40 1.00
BZ-66A h=1.40 1.00
BZ-66 h=1.30 1.00
BZ-68A h=1.40 1.00
BZ-55 h=1.2 1.00
BZ-123 h=1.20 1.00
BZ-558 h=1.20 1.00
BZ-558A h=1.2 1.00
BZ-558B h=1.2 1.00
BZ-558C h=1.20 1.00

CHICHILIN
BZCHI 62A h=1.40 1.00
BZCHI 62 h=1.40 1.00
BZCHI 63B h=1.20 1.00
BZCHI 63A h=1.20 1.00
BZCHI 63 h=1.20 1.00
BZCHI 64B h=1.20 1.00
BZCHI 64A h=1.20 1.00
BZCHI 65A h=1.20 1.00
BZCHI 65 h=1.20 1.00
BZCHI 66 h=1.20 1.00
BZCHI 67 h=1.20 1.00
BZCHI 68 h=1.20 1.00
BZCHI 74 h=1.20 1.00
BZCHI 75 h=1.20 1.00
BZCHI 76 h=1.20 1.00
BZCHI 77 h=1.40 1.00
BZCHI 78 h=1.40 1.00
BZCHI 79 h=1.40 1.00
BZCHI 80 h=1.40 1.00
BZCHI 81 h=1.40 1.00
BZCHI 82 h=1.40 1.00
BZCHI 83 h=1.40 1.00
BZCHI 84 h=1.40 1.00
BZCHI 85 h=1.40 1.00
BZCHI 86 h=1.40 1.00
BZCHI 87 h=1.40 1.00
BZCHI 88 h=1.40 1.00
BZCHI 89 h=1.40 1.00
BZCHI 90 h=1.40 1.00
BZCHI 91 h=1.40 1.00
BZCHI 92 h=1.40 1.00
BZCHI 93 h=1.40 1.00
BZ 974 h=1.40 1.00

12.02.05.02 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=2.00M und 65.00 7.00 128.83 901.81

TAMAÑA
BZ_D h=1.65 1.00
BZ_C h=1.65 1.00

COGRI
BZ-35 h=1.60 1.00
BZ-134 h=1.60 1.00
BZ-67 h=1.60 1.00
BZ-68 h=1.80 1.00

CHICHILIN
BZCHI 71 h=2.00 1.00

12.02.05.03 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=2.50M und 31.00 1.00 141.74 141.74

COGRI
BZ - 30 H 2.43 1.00

12.02.05.04 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=3.00M und 30.00 6.00 157.48 944.88

TAMAÑA
BZ_G h=2.80 1.00
BZ_F h=2.65 1.00

COGRI
BZ-37 h=2.95 1.00

CHICHILIN
BZCHI 70 h=2.70 1.00
BZCHI 72 h=2.70 1.00
BZCHI 73 h=2.70 1.00

12.02.05.05 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=3.50M und 30.00 2.00 177.17 354.34

COGRI
BZ-69 h=3.20 1.00

CHICHILIN
BZCHI 69 h=3.40 1.00

12.02.06 CONSTRUCCION DE BUZONES


12.02.06.01 CONSTRUCCION DE BUZONES DN=1.20M, H=1.2 @1.50m Und 537.00 87.00 1,453.31 126,437.97

TAMAÑA
BZ-459 h=1.38 1.00
BZ-458 h=1.25 1.00
BZ-457 h=1.50 1.00
BZ-456 h=1.40 1.00
BZ-H h=1.40 1.00
BZ-E h=1.40 1.00
BZ-B h=1.20 1.00
BZ-A h=1.20 1.00

COGRI
BZ-24 h=1.20 1.00
BZ-25 h=1.20 1.00
BZ-27 h=1.30 1.00
BZ-33 h=1.30 1.00
BZ-33A h=1.20 1.00
BZ-34 h=1.40 1.00
BZ-129 h=1.50 1.00
BZ-28 h=1.4 1.00
BZ-35A h=1.5 1.00
BZ-36 h=1.4 1.00
BZ-127 h=1.4 1.00
BZ-128 h=1.4 1.00
BZ-38 h=1.5 1.00
BZ-39 h=1.5 1.00
BZ-40 h=1.4 1.00
BZ-41 h=1.3 1.00
BZ-36 h=1.30 1.00
BZ-42 h=1.2 1.00
BZ-32 h=1.2 1.00
BZ-31 h=1.3 1.00
BZ-45 h=1.2 1.00
BZ-44 h=1.4 1.00
BZ-46 h=1.3 1.00
BZ-47 h=1.2 1.00
BZ-48 h=1.2 1.00
BZ-125 h=1.2 1.00
BZ-49 h=1.4 1.00
BZ-49A h=1.4 1.00
BZ-50 h=1.4 1.00
BZ-51 h=1.40 1.00
BZ-52 h=1.50 1.00
BZ-53 h=1.20 1.00
BZ-61 h=1.30 1.00
BZ-133 h=1.30 1.00
BZ-62 h=1.30 1.00
BZ-63 h=1.50 1.00
BZ-65 h=1.40 1.00
BZ-66A h=1.40 1.00
BZ-66 h=1.30 1.00
BZ-68A h=1.40 1.00
BZ-55 h=1.2 1.00
BZ-123 h=1.20 1.00
BZ-558 h=1.20 1.00
BZ-558A h=1.2 1.00
BZ-558B h=1.2 1.00
BZ-558C h=1.20 1.00
CHICHILIN
BZCHI 62A h=1.40 1.00
BZCHI 62 h=1.40 1.00
BZCHI 63B h=1.20 1.00
BZCHI 63A h=1.20 1.00
BZCHI 63 h=1.20 1.00
BZCHI 64B h=1.20 1.00
BZCHI 64A h=1.20 1.00
BZCHI 65A h=1.20 1.00
BZCHI 65 h=1.20 1.00
BZCHI 66 h=1.20 1.00
BZCHI 67 h=1.20 1.00
BZCHI 68 h=1.20 1.00
BZCHI 74 h=1.20 1.00
BZCHI 75 h=1.20 1.00
BZCHI 76 h=1.20 1.00
BZCHI 77 h=1.40 1.00
BZCHI 78 h=1.40 1.00
BZCHI 79 h=1.40 1.00
BZCHI 80 h=1.40 1.00
BZCHI 81 h=1.40 1.00
BZCHI 82 h=1.40 1.00
BZCHI 83 h=1.40 1.00
BZCHI 84 h=1.40 1.00
BZCHI 85 h=1.40 1.00
BZCHI 86 h=1.40 1.00
BZCHI 87 h=1.40 1.00
BZCHI 88 h=1.40 1.00
BZCHI 89 h=1.40 1.00
BZCHI 90 h=1.40 1.00
BZCHI 91 h=1.40 1.00
BZCHI 92 h=1.40 1.00
BZCHI 93 h=1.40 1.00
BZ 974 h=1.40 1.00

12.02.06.02 CONSTRUCCION DE BUZONES DN=1.20M, H=1.51 @2.00m Und 65.00 7.00 1,669.55 11,686.85

TAMAÑA
BZ_D h=1.65 1.00
BZ_C h=1.65 1.00

COGRI
BZ-35 h=1.60 1.00
BZ-134 h=1.60 1.00
BZ-67 h=1.60 1.00
BZ-68 h=1.80 1.00

CHICHILIN
BZCHI 71 h=2.00 1.00

12.02.06.03 CONSTRUCCION DE BUZONES DN=1.20M, H=2.01 @2.50m Und 30.00 3.00 1,646.94 4,940.82

COGRI
BZ - 30 H 2.43 1.00

CHICHILIN
BZCHI 50 h=2.30 1.00
BZCHI 98 h=2.40 1.00

12.02.06.04 CONSTRUCCION DE BUZONES DN=1.20M, H=2.51 @3.00m Und 30.00 6.00 1,951.04 11,706.24

TAMAÑA
BZ_G h=2.80 1.00
BZ_F h=2.65 1.00

COGRI
BZ-37 h=2.95 1.00

CHICHILIN
BZCHI 70 h=2.70 1.00
BZCHI 72 h=2.70 1.00
BZCHI 73 h=2.70 1.00

12.02.06.05 CONSTRUCCION DE BUZONES DN=1.20M, H=3.01 @3.50m Und 30.00 2.00 3,296.84 6,593.68

COGRI
BZ-69 h=3.20 1.00

CHICHILIN
BZCHI 69 h=3.40 1.00
PPTO - CHICHILIN (SISTEMA DE ALCANTARILLADO) S/. 162,401.74

PPTO - COGRI ( SISTEMA DE ALCANTARILLADO) S/. 86,850.05

PPTO - ESCOBAYA - SAN FRANCISCO ( SISTEMA DE ALCANTARILLADO) S/. 207,980.68


PPTO - TAMAÑA ( SISTEMA DE ALCANTARILLADO) S/. 116,913.72

PPTO TOTAL S/. 574,146.19


PREPUESUPUESTO DE PLANIFICACION PARA EL PERIODO 01/08/2021 AL 31/08/2021

METRADO COSTO
ITEM PARTIDA UNIDAD EXPEDIENTE METRADO META UNITARIO PPTO

11 SISTEMA DE AGUA POTABLE

11.02 RED DE AGUA CRUDA - ADUCCION

11.02.01 OBRAS PRELIMINARES


11.02.01.01 TRAZO Y REPLANTEO INICIAL C/EQUIPO km 19.88 0.00 803.67 0.00
11.02.02 MOVIMIENTO DE TIERRAS
11.02.02.01 EXCAVACION DE ZANJA PARA TUBERIA HDPE H=0.30M m 19,878.08 0.00 2.86 0.00
11.02.02.02 RELLENO PROTECTOR A=0.60M, MAT/PROPIO CONDUCCION m 19,878.08 0.00 11.95 0.00
11.02.03 TUBERIA DE AGUA POTABLE HDPE
11.02.03.04 SUMINISTRO DE TUBERIA HDPE ISO 4427 PN 10, DN 110MM m 8,228.61 0.00 18.18 0.00
11.02.03.09 INSTALACION DE TUBERIA HDPE ISO 4427 PN 10, DN 110MM m 8,228.61 0.00 5.81 0.00
11.02.03.11 PRUEBA HIDRAULICA A ZANJA ABIERTA Y DESINFECCION DE TUBERIA AGUA POTAB m 19,878.08 0.00 3.26 0.00
11.02.03.12 PRUEBA HIDRAULICA A ZANJA TAPADA Y DESINFECCION DE TUBERIA AGUA POTAB m 19,878.08 0.00 3.26 0.00

12 SISTEMA DE ALCANTARILLADO
12.01 RED DE DESAGUE - COLECTORES PRIMARIOS
12.02.02 MOVIMIENTO DE TIERRAS
12.01.02.01 EXCAVACION C/EQUIPO T.NORMAL H=1.50M, P/TUB DN 200MM DESAGUE m 6,177.12 271.63 14.12 3,835.42

TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

ESCOABYA - SAN FRANCISCO


BZ 840@ BZ 841 h=2.53, h=2.79
BZ 841@ BZ 842 h=2.79, h=3.28
BZ 842@ BZ 843 h=3.28, h=3.31
BZ 843@ BZ 844 h=3.31, h=3.30
BZ 844@ BZ 845 h=3.30, h=3.37
BZ 845@ BZ 846 h=3.37, h=2.35
BZ 846@ BZ 847 h=2.35, h=2.36
BZ 847@ BZ 848 h=2.36, h=2.65
BZ 848@ BZ 849 h=2.65, h=1.60
BZ 850@ BZ 851 h=1.60, h=1.20
BZ 851@ BZ 852 h=1.20, h=1.40
BZ 852@ BZ 853 h=1.40, h=1.95
BZ 853@ BZ 854 h=1.95, h=1.20
BZ 854@ BZ 855 h=2.53, h=2.79
BZ 855@ BZ 856 h=2.53, h=2.79
BZ 856@ BZ 857 h=2.53, h=2.79
BZ 857@ BZ 858 h=2.53, h=2.79
BZ 858@ BZ 859 h=2.53, h=2.79
BZ 859@ BZ 859A h=2.53, h=2.79
BZ 859A@ BZ 859B h=2.53, h=2.79
BZ 859B @ BZ 860 h=2.53, h=2.79

12.01.02.04 EXCAVACION C/EQUIPO T.NORMAL H=2.00M, P/TUB DN 200MM DESAGUE m 4,770.76 0.00 18.01 0.00

ESCOABYA - SAN FRANCISCO


BZ 849 @ BZ 850
BZ 852 @ BZ 853
BZ 853 @ BZ 854
BZ 854 @ BZ 855
BZ A5 @ BZ A6
BZ A6 @ BZ A7

12.01.02.04 EXCAVACION C/EQUIPO T.NORMAL H=2.50M, P/TUB DN 200MM DESAGUE 67.04 19.21 1,287.84

TAMAÑA

BZ 406_25 @ BZ 406_24 25.77


BZ 406_24 @ BZ 406_23 41.27

12.01.02.10 EXCAVACION C/EQUIPO T.NORMAL H=3.00M, P/TUB DN 200MM DESAGUE m 1,507.77 13.70 20.60 282.22

TAMAÑA
BZ 406_12 @ BZ 406_13 13.70
ESCOBAYA - SAN FRANCISCO
BZ 840 @ BZ 841
BZ 847 @ BZ 848
BZ 848 @ BZ 849
BZ A8 @ BZ A9
BZ A9 @ BZ A10
BZ A10 @ BZ A11
BZ A11 @ BZ A12

12.02.03.13 EXCAVACION C/EQUIPO T.NORMAL H=3.50M, P/TUB DN 200MM DESAGUE m 300.53 0.00 21.40 0.00

ESCOBAYA - SAN FRANCISCO


BZ 841 @ BZ 842
BZ 842 @ BZ 843
BZ 843 @ BZ 844
BZ 844 @ BZ 845
BZ 845 @ BZ 846

12.02.03.16 EXCAVACION C/EQUIPO T.NORMAL H=4.00M, P/TUB DN 200MM DESAGUE m 173.12 132.29 21.80 2,883.92

TAMAÑA
BZ 406_5 @ BZ 406_6 51.58
BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

12.01.02.55 REFINE Y NIVELACION ZANJA T.NORMAL, P/DESAGUE m 17,490.58 484.66 2.79 1,352.20

TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

BZ 406_25 @ BZ 406_24 25.77


BZ 406_24 @ BZ 406_23 41.27

BZ 406_12 @ BZ 406_13 13.70

BZ 406_5 @ BZ 406_6 51.58


BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

ESCOBAYA - SAN FRANCISCO


BZ 850@ BZ 851
BZ 851@ BZ 852
BZ A1 @ BZ A2
BZ A2@ BZ A3
BZ A3@ BZ A4
BZ A4@ BZ A5
BZ 849 @ BZ 850
BZ 852 @ BZ 853
BZ 853 @ BZ 854
BZ 854 @ BZ 855
BZ A5 @ BZ A6
BZ A6 @ BZ A7
BZ 846 @ BZ 847
BZ 855 @ BZ 856
BZ A7 @ BZ A8
BZ 840 @ BZ 841
BZ 847 @ BZ 848
BZ 848 @ BZ 849
BZ A8 @ BZ A9
BZ A9 @ BZ A10
BZ A10 @ BZ A11
BZ A11 @ BZ A12
BZ 841 @ BZ 842
BZ 842 @ BZ 843
BZ 843 @ BZ 844
BZ 844 @ BZ 845
BZ 845 @ BZ 846

12.01.02.58 CAMA DE ARENA EN ZANJA H=0.10M, A=0.60M m 18,219.35 484.66 7.09 3,436.24

TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

BZ 406_25 @ BZ 406_24 25.77


BZ 406_24 @ BZ 406_23 41.27

BZ 406_12 @ BZ 406_13 13.70

BZ 406_5 @ BZ 406_6 51.58


BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

ESCOBAYA - SAN FRANCISCO


BZ 850@ BZ 851
BZ 851@ BZ 852
BZ A1 @ BZ A2
BZ A2@ BZ A3
BZ A3@ BZ A4
BZ A4@ BZ A5
BZ 849 @ BZ 850
BZ 852 @ BZ 853
BZ 853 @ BZ 854
BZ 854 @ BZ 855
BZ A5 @ BZ A6
BZ A6 @ BZ A7
BZ 846 @ BZ 847
BZ 855 @ BZ 856
BZ A7 @ BZ A8
BZ 840 @ BZ 841
BZ 847 @ BZ 848
BZ 848 @ BZ 849
BZ A8 @ BZ A9
BZ A9 @ BZ A10
BZ A10 @ BZ A11
BZ A11 @ BZ A12
BZ 841 @ BZ 842
BZ 842 @ BZ 843
BZ 843 @ BZ 844
BZ 844 @ BZ 845
BZ 845 @ BZ 846

12.01.02.59 RELLENO PROTECTOR C/MAT PROPIO P/TUB 200MM, H=0.30M m 18,219.35 484.66 5.35 2,592.93

TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

BZ 406_25 @ BZ 406_24 25.77


BZ 406_24 @ BZ 406_23 41.27

BZ 406_12 @ BZ 406_13 13.70

BZ 406_5 @ BZ 406_6 51.58


BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

ESCOBAYA - SAN FRANCISCO


BZ 850@ BZ 851
BZ 851@ BZ 852
BZ A1 @ BZ A2
BZ A2@ BZ A3
BZ A3@ BZ A4
BZ A4@ BZ A5
BZ 849 @ BZ 850
BZ 852 @ BZ 853
BZ 853 @ BZ 854
BZ 854 @ BZ 855
BZ A5 @ BZ A6
BZ A6 @ BZ A7
BZ 846 @ BZ 847
BZ 855 @ BZ 856
BZ A7 @ BZ A8
BZ 840 @ BZ 841
BZ 847 @ BZ 848
BZ 848 @ BZ 849
BZ A8 @ BZ A9
BZ A9 @ BZ A10
BZ A10 @ BZ A11
BZ A11 @ BZ A12
BZ 841 @ BZ 842
BZ 842 @ BZ 843
BZ 843 @ BZ 844
BZ 844 @ BZ 845
BZ 845 @ BZ 846

12.01.02.60 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=1.50M m 6,434.50 271.63 3.81 1,034.91

TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

ESCOBAYA - SAN FRANCISCO


BZ 850@ BZ 851
BZ 851@ BZ 852
BZ A1 @ BZ A2
BZ A2@ BZ A3
BZ A3@ BZ A4
BZ A4@ BZ A5

12.01.02.61 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=2.00M m 4,969.54 0.00 6.25 0.00

ESCOBAYA - SAN FRANCISCO


BZ 849 @ BZ 850
BZ 852 @ BZ 853
BZ 853 @ BZ 854
BZ 854 @ BZ 855
BZ A5 @ BZ A6
BZ A6 @ BZ A7

12.01.02.62 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=2.50M m 4,969.54 67.04 7.25 486.04

TAMAÑA
BZ 406_25 @ BZ 406_24 25.77
BZ 406_24 @ BZ 406_23 41.27

12.01.02.63 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=3.00M m 1,570.59 13.70 7.25 99.33

TAMAÑA
BZ 406_12 @ BZ 406_13 13.70

12.01.02.64 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=3.50M m 1,570.59 0.00 5.84 0.00

ESCOBAYA - SAN FRANCISCO


BZ 841 @ BZ 842
BZ 842 @ BZ 843
BZ 843 @ BZ 844
BZ 844 @ BZ 845
BZ 845 @ BZ 846

12.01.02.65 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=4.00M m 463.77 132.29 7.80 1,031.86

TAMAÑA

BZ 406_5 @ BZ 406_6 51.58


BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

12.01.03 TUBERIA DE DESAGUE


12.01.03.01 SUMINISTRO DE TUBERIA ISO 4435 S-25 DN 200MM U/FLEXIBLE m 18,219.35 484.66 26.85 13,013.12

TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

BZ 406_25 @ BZ 406_24 25.77


BZ 406_24 @ BZ 406_23 41.27

BZ 406_12 @ BZ 406_13 13.70

BZ 406_5 @ BZ 406_6 51.58


BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59
ESCOBAYA - SAN FRANCISCO
BZ 850@ BZ 851
BZ 851@ BZ 852
BZ A1 @ BZ A2
BZ A2@ BZ A3
BZ A3@ BZ A4
BZ A4@ BZ A5
BZ 849 @ BZ 850
BZ 852 @ BZ 853
BZ 853 @ BZ 854
BZ 854 @ BZ 855
BZ A5 @ BZ A6
BZ A6 @ BZ A7
BZ 846 @ BZ 847
BZ 855 @ BZ 856
BZ A7 @ BZ A8
BZ 840 @ BZ 841
BZ 847 @ BZ 848
BZ 848 @ BZ 849
BZ A8 @ BZ A9
BZ A9 @ BZ A10
BZ A10 @ BZ A11
BZ A11 @ BZ A12
BZ 841 @ BZ 842
BZ 842 @ BZ 843
BZ 843 @ BZ 844
BZ 844 @ BZ 845
BZ 845 @ BZ 846

12.01.03.02 INSTALACION DE TUBERIA ISO 4435 S-25 DN=200MM m 18,219.35 484.66 4.28 2,074.34

TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

BZ 406_25 @ BZ 406_24 25.77


BZ 406_24 @ BZ 406_23 41.27

BZ 406_12 @ BZ 406_13 13.70

BZ 406_5 @ BZ 406_6 51.58


BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

ESCOBAYA - SAN FRANCISCO


BZ 850@ BZ 851
BZ 851@ BZ 852
BZ A1 @ BZ A2
BZ A2@ BZ A3
BZ A3@ BZ A4
BZ A4@ BZ A5
BZ 849 @ BZ 850
BZ 852 @ BZ 853
BZ 853 @ BZ 854
BZ 854 @ BZ 855
BZ A5 @ BZ A6
BZ A6 @ BZ A7
BZ 846 @ BZ 847
BZ 855 @ BZ 856
BZ A7 @ BZ A8
BZ 840 @ BZ 841
BZ 847 @ BZ 848
BZ 848 @ BZ 849
BZ A8 @ BZ A9
BZ A9 @ BZ A10
BZ A10 @ BZ A11
BZ A11 @ BZ A12
BZ 841 @ BZ 842
BZ 842 @ BZ 843
BZ 843 @ BZ 844
BZ 844 @ BZ 845
BZ 845 @ BZ 846

12.01.03.03 PRUEBA HIDRAULICA PARCIAL A ZANJA DESCUBIERTA DE TUBERIA PVC/ISO 4435 m 18,219.35 484.66 1.99 964.47

TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

BZ 406_25 @ BZ 406_24 25.77


BZ 406_24 @ BZ 406_23 41.27

BZ 406_12 @ BZ 406_13 13.70

BZ 406_5 @ BZ 406_6 51.58


BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

ESCOBAYA - SAN FRANCISCO


BZ 850@ BZ 851
BZ 851@ BZ 852
BZ A1 @ BZ A2
BZ A2@ BZ A3
BZ A3@ BZ A4
BZ A4@ BZ A5
BZ 849 @ BZ 850
BZ 852 @ BZ 853
BZ 853 @ BZ 854
BZ 854 @ BZ 855
BZ A5 @ BZ A6
BZ A6 @ BZ A7
BZ 846 @ BZ 847
BZ 855 @ BZ 856
BZ A7 @ BZ A8
BZ 840 @ BZ 841
BZ 847 @ BZ 848
BZ 848 @ BZ 849
BZ A8 @ BZ A9
BZ A9 @ BZ A10
BZ A10 @ BZ A11
BZ A11 @ BZ A12
BZ 841 @ BZ 842
BZ 842 @ BZ 843
BZ 843 @ BZ 844
BZ 844 @ BZ 845
BZ 845 @ BZ 846

12.01.03.04 PRUEBA HIDRAULICA FINAL A ZANJA TAPADA DE TUBERIA PVC/ISO 4435 DN=200MM m 18,219.35 484.66 1.99 964.47

TAMAÑA
BZ 406 @ BZ 406_4 25.25
BZ 406_29 @ BZ 406_28 43.40
BZ 406_28 @ BZ 406_27 19.35
BZ 406_27 @ BZ 406_26 25.80
BZ 406_26 @ BZ 406_25 21.85
BZ 406_23 @ BZ 406_22 33.18
BZ 406_22 @ BZ 406_21 11.95
BZ 406_21 @ BZ 406_20 30.09
BZ 406_20 @ BZ 406_19 60.76

BZ 406_25 @ BZ 406_24 25.77


BZ 406_24 @ BZ 406_23 41.27

BZ 406_12 @ BZ 406_13 13.70

BZ 406_5 @ BZ 406_6 51.58


BZ 406_6 @ BZ 406_7 41.12
BZ 406_7 @ BZ 406_9 39.59

ESCOBAYA - SAN FRANCISCO


BZ 850@ BZ 851
BZ 851@ BZ 852
BZ A1 @ BZ A2
BZ A2@ BZ A3
BZ A3@ BZ A4
BZ A4@ BZ A5
BZ 849 @ BZ 850
BZ 852 @ BZ 853
BZ 853 @ BZ 854
BZ 854 @ BZ 855
BZ A5 @ BZ A6
BZ A6 @ BZ A7
BZ 846 @ BZ 847
BZ 855 @ BZ 856
BZ A7 @ BZ A8
BZ 840 @ BZ 841
BZ 847 @ BZ 848
BZ 848 @ BZ 849
BZ A8 @ BZ A9
BZ A9 @ BZ A10
BZ A10 @ BZ A11
BZ A11 @ BZ A12
BZ 841 @ BZ 842
BZ 842 @ BZ 843
BZ 843 @ BZ 844
BZ 844 @ BZ 845
BZ 845 @ BZ 846

12.01.04 EXCAVACIONES DE BUZONES

12.01.04.01 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=1.50M und 281.00 25.00 118.11 2,952.75

TAMAÑA
BZ - 406-B h =1.40 1.00
BZ - 407 h =1.40 1.00
BZ - 408 h =1.30 1.00
BZ - 409 h =1.30 1.00
BZ - 410 h =1.20 1.00
BZ - 411 h =1.20 1.00
BZ - 412-A h =1.50 1.00
BZ - 412 h =1.50 1.00
BZ - 413 h =1.30 1.00
BZ - 414 h =1.50 1.00
BZ - 415 h =1.30 1.00
BZ - 416 h =1.50 1.00
BZ - 417 h =1.50 1.00
BZ - 418 h =1.40 1.00
BZ - 419 h =1.25 1.00
BZ - 420 h =1.35 1.00
BZ - 406_19 h =1.20 1.00
BZ - 406_20 h =1.20 1.00
BZ - 406_21 h =1.20 1.00
BZ - 406_22 h =1.20 1.00
BZ - 406_23 h =1.21 1.00
BZ - 406_25 h =1.20 1.00
BZ - 406_26 h =1.20 1.00
BZ - 406_27 h =1.20 1.00
BZ - 406_28 h =1.20 1.00

12.01.04.02 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=2.00M und 108.00 0.00 128.83 0.00

ESCOBAYA - SAN FRANCISCO

12.01.04.03 EXCAVACION BUZON, Dexc.=2.01M, HASTA H=2.50M und 59.00 1.00 141.74 141.74

TAMAÑA
BZ - 406_24 h =2.20 1.00

12.01.04.04 EXCAVACION BUZON, Dexc.=2.50M, HASTA H=3.00M und 25.00 0.00 157.48 0.00

ESCOBAYA - SAN FRANCISCO

12.01.04.05 EXCAVACION BUZON, Dexc.=1.90M, HASTA H=3.50M und 20.00 0.00 3,543.40 0.00

ESCOBAYA - SAN FRANCISCO

12.01.04.06 EXCAVACION BUZON, Dexc.=1.90M, HASTA H=4.00M und 14.00 0.00 2,833.60 0.00

ESCOBAYA - SAN FRANCISCO

12.01.04.07 EXCAVACION BUZON, Dexc.=1.90M, HASTA H=4.50M und 11.00 0.00 2,598.42 0.00

ESCOBAYA - SAN FRANCISCO


12.01.05 CONSTRUCCION DE BUZONES
12.01.05.01 CONSTRUCCION DE BUZONES DN=1.20M, H=1.2 @1.50m und 281.00 25.00 1,453.31 36,332.75

ESCOBAYA - SAN FRANCISCO

TAMAÑA COGRI
BZ - 406-B h =1.40 1.00
BZ - 407 h =1.40 1.00
BZ - 408 h =1.30 1.00
BZ - 409 h =1.30 1.00
BZ - 410 h =1.20 1.00
BZ - 411 h =1.20 1.00
BZ - 412-A h =1.50 1.00
BZ - 412 h =1.50 1.00
BZ - 413 h =1.30 1.00
BZ - 414 h =1.50 1.00
BZ - 415 h =1.30 1.00
BZ - 416 h =1.50 1.00
BZ - 417 h =1.50 1.00
BZ - 418 h =1.40 1.00
BZ - 419 h =1.25 1.00
BZ - 420 h =1.35 1.00
BZ - 406_19 h =1.20 1.00
BZ - 406_20 h =1.20 1.00
BZ - 406_21 h =1.20 1.00
BZ - 406_22 h =1.20 1.00
BZ - 406_23 h =1.21 1.00
BZ - 406_25 h =1.20 1.00
BZ - 406_26 h =1.20 1.00
BZ - 406_27 h =1.20 1.00
BZ - 406_28 h =1.20 1.00

12.01.05.02 CONSTRUCCION DE BUZONES DN=1.20M, H=1.51 @2.00m und 108.00 0.00 1,669.55 0.00

ESCOBAYA - SAN FRANCISCO

TAMAÑA-COGRI

12.01.05.03 CONSTRUCCION DE BUZONES DN=1.20M, H=2.01 @2.50m und 59.00 1.00 1,646.94 1,646.94

ESCOBAYA - SAN FRANCISCO

TAMAÑA
BZ - 406_24 h =2.20 1.00

12.01.05.04 CONSTRUCCION DE BUZONES DN=1.20M, H=2.51 @3.00m und 25.00 0.00 1,951.04 0.00

ESCOBAYA - SAN FRANCISCO

12.01.05.05 CONSTRUCCION DE BUZONES DN=1.50M, H=3.01 @3.50m und 20.00 0.00 3,296.84 0.00
12.01.05.06 CONSTRUCCION DE BUZONES DN=1.50M, H=3.51 @4.00m und 14.00 0.00 3,526.15 0.00

12.01.05.07 CONSTRUCCION DE BUZONES DN=1.50M, H=4.01 @4.50m und 11.00 0.00 3,683.83 0.00

12.01.05.16 ANCLAJE O DADOS DE CONCRETO F´c=140KG/CM2 EN BUZONES und 1,104.00 29.05 0.00

12.02 RED DE DESAGUE - COLECTORES SECUNDARIOS


12.02.03 MOVIMIENTO DE TIERRAS
12.02.03.01 EXCAVACION C/EQUIPO T.NORMAL H=1.50M, P/TUB DN 200MM DESAGUE m 12,839.66 130.28 14.12 1,839.55

TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

12.02.03.04 EXCAVACION C/EQUIPO T.NORMAL H=2.00M, P/TUB DN 200MM DESAGUE m 3,277.18 59.95 18.01 1,079.70

TAMAÑA
BZ_D @ BZ_E 24.89
BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20 h=1.65
BZCHI 51 @ BZCHI 52 h=1.60, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=2.00
BZCHI 76 @ BZCHI 77 h=2.00, h=1.40

12.02.03.07 EXCAVACION C/EQUIPO T.NORMAL H=2.50M, P/TUB DN 200MM DESAGUE m 1,795.40 0.00 19.21 0.00

CHICHILIN

12.02.03.10 EXCAVACION C/EQUIPO T.NORMAL H=3.00M, P/TUB DN 200MM DESAGUE m 1,085.93 86.31 20.60 1,777.99

TAMAÑA
BZ_G @ BZ_H 34.73
BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

CHICHILIN

BZCHI 71 @ BZCHI 72 h=2.00, h=2.70


BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

12.02.03.13 EXCAVACION C/EQUIPO T.NORMAL H=3.50M, P/TUB DN 200MM DESAGUE m 1,085.93 0.00 21.40 0.00

CHICHILIN
BZCHI 68 @ BZCHI 69 h=1.20, h=3.40
BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.03.35 REFINE Y NIVELACION ZANJA T.NORMAL, P/DESAGUE m 20,074.25 276.54 2.79 771.55
TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

BZ_D @ BZ_E 24.89


BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

BZ_G @ BZ_H 34.73


BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20
BZ 778 B@ BZ 778 C h=1.20, h=2.65
BZ 778 C @ BZ 778 D h=2.65 h =1.60
BZ 778D @ BZ 778 D1 h=1.60 h =1.80
BZ 778D1 @ BZ 778 E h=1.80 h =1.20

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.03.38 CAMA DE ARENA EN ZANJA H=0.10M, A=0.60M m 28,677.50 276.54 7.09 1,960.67

TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

BZ_D @ BZ_E 24.89


BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

BZ_G @ BZ_H 34.73


BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20
BZ 778 B@ BZ 778 C h=1.20, h=2.65
BZ 778 C @ BZ 778 D h=2.65 h =1.60
BZ 778D @ BZ 778 D1 h=1.60 h =1.80
BZ 778D1 @ BZ 778 E h=1.80 h =1.20

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.03.39 RELLENO PROTECTOR C/MAT PROPIO P/TUB 200MM, H=0.30M m 28,677.50 276.54 5.35 1,479.49

TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

BZ_D @ BZ_E 24.89


BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

BZ_G @ BZ_H 34.73


BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20
BZ 778 B@ BZ 778 C h=1.20, h=2.65
BZ 778 C @ BZ 778 D h=2.65 h =1.60
BZ 778D @ BZ 778 D1 h=1.60 h =1.80
BZ 778D1 @ BZ 778 E h=1.80 h =1.20

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.03.40 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=1.50M m 18,342.37 130.28 3.81 496.37

TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

12.02.03.41 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=2.00M m 4,681.68 59.95 6.25 374.69

TAMAÑA
BZ_D @ BZ_E 24.89
BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20 h=1.65

CHICHILIN

12.02.03.42 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=2.50M m 2,564.85 0.00 7.25 0.00

12.02.03.43 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=3.00M m 1,551.33 86.31 7.25 625.75

TAMAÑA
BZ_G @ BZ_H 34.73
BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

COLOHUACHE
BZ 778 B@ BZ 778 C h=1.20, h=2.65
BZ 778 C @ BZ 778 D h=2.65 h =1.60
BZ 778D @ BZ 778 D1 h=1.60 h =1.80
BZ 778D1 @ BZ 778 E h=1.80 h =1.20
CHICHILIN
BZCHI 70 @ BZCHI 71 h=2.70, h=2.00
BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

12.02.03.43 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=3.50M m 0.00


CHICHILIN
BZCHI 68 @ BZCHI 69 h=1.20, h=3.40
BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.04 TUBERIA DE DESAGUE


12.02.04.01 SUMINISTRO DE TUBERIA ISO 4435 S-25 DN 200MM U/FLEXIBLE m 28,677.50 276.54 26.85 7,425.10

TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

BZ_D @ BZ_E 24.89


BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

BZ_G @ BZ_H 34.73


BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20
BZ 778 B@ BZ 778 C h=1.20, h=2.65
BZ 778 C @ BZ 778 D h=2.65 h =1.60
BZ 778D @ BZ 778 D1 h=1.60 h =1.80
BZ 778D1 @ BZ 778 E h=1.80 h =1.20

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.04.02 INSTALACION DE TUBERIA ISO 4435 S-25 DN=200MM m 28,677.50 276.54 4.28 1,183.59
TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

BZ_D @ BZ_E 24.89


BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

BZ_G @ BZ_H 34.73


BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20
BZ 778 B@ BZ 778 C h=1.20, h=2.65
BZ 778 C @ BZ 778 D h=2.65 h =1.60
BZ 778D @ BZ 778 D1 h=1.60 h =1.80
BZ 778D1 @ BZ 778 E h=1.80 h =1.20

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.04.03 PRUEBA HIDRAULICA PARCIAL A ZANJA DESCUBIERTA DE TUBERIA PVC/ISO 4435 m 28,677.50 276.54 1.99 550.31

TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

BZ_D @ BZ_E 24.89


BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

BZ_G @ BZ_H 34.73


BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20
BZ 778 B@ BZ 778 C h=1.20, h=2.65
BZ 778 C @ BZ 778 D h=2.65 h =1.60
BZ 778D @ BZ 778 D1 h=1.60 h =1.80
BZ 778D1 @ BZ 778 E h=1.80 h =1.20

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.04.04 PRUEBA HIDRAULICA FINAL A ZANJA TAPADA DE TUBERIA PVC/ISO 4435 DN=200MM m 28,677.50 276.54 1.99 550.31

TAMAÑA
BZ 459 @ BZ 458 25.28
BZ 458 @ BZ 457 14.81
BZ 457 @ BZ 456 25.34
BZ H @ BZ 456 18.23
BZ_A @ BZ_B 46.62

BZ_D @ BZ_E 24.89


BZ_C @ BZ_D 9.52
BZ_B @ BZ_C 25.54

BZ_G @ BZ_H 34.73


BZ_F @ BZ_G 26.69
BZ_E @ BZ_F 24.89

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20
BZ 778 B@ BZ 778 C h=1.20, h=2.65
BZ 778 C @ BZ 778 D h=2.65 h =1.60
BZ 778D @ BZ 778 D1 h=1.60 h =1.80
BZ 778D1 @ BZ 778 E h=1.80 h =1.20

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.05 EXCAVACION DE BUZONES


12.02.05.01 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=1.50M und 537.00 8.00 118.11 944.88

TAMAÑA
BZ-459 h=1.38 1.00
BZ-458 h=1.25 1.00
BZ-457 h=1.50 1.00
BZ-456 h=1.40 1.00
BZ-H h=1.40 1.00
BZ-E h=1.40 1.00
BZ-B h=1.20 1.00
BZ-A h=1.20 1.00

CHICHILIN
BZCHI 62A h=1.40
BZCHI 62 h=1.40
BZCHI 63B h=1.20
BZCHI 63A h=1.20
BZCHI 63 h=1.20
BZCHI 64B h=1.20
BZCHI 64A h=1.20
BZCHI 65A h=1.20
BZCHI 65 h=1.20
BZCHI 66 h=1.20
BZCHI 67 h=1.20
BZCHI 68 h=1.20
BZCHI 74 h=1.20
BZCHI 75 h=1.20
BZCHI 76 h=1.20
BZCHI 77 h=1.40
BZCHI 78 h=1.40
BZCHI 79 h=1.40
BZCHI 80 h=1.40
BZCHI 81 h=1.40
BZCHI 82 h=1.40
BZCHI 83 h=1.40
BZCHI 84 h=1.40
BZCHI 85 h=1.40
BZCHI 86 h=1.40
BZCHI 87 h=1.40
BZCHI 88 h=1.40
BZCHI 89 h=1.40
BZCHI 90 h=1.40
BZCHI 91 h=1.40
BZCHI 92 h=1.40
BZCHI 93 h=1.40
BZ 974 h=1.40

12.02.05.02 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=2.00M und 65.00 2.00 128.83 257.66

TAMAÑA
BZ_D h=1.65 1.00
BZ_C h=1.65 1.00

CHICHILIN
BZCHI 71 h=2.00

12.02.05.03 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=2.50M und 31.00 0.00 141.74 0.00

COGRI

12.02.05.04 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=3.00M und 30.00 2.00 157.48 314.96

TAMAÑA
BZ_G h=2.80 1.00
BZ_F h=2.65 1.00

CHICHILIN
BZCHI 70 h=2.70
BZCHI 72 h=2.70
BZCHI 73 h=2.70

12.02.05.05 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=3.50M und 30.00 0.00 177.17 0.00

COGRI

CHICHILIN
BZCHI 69 h=3.40

12.02.06 CONSTRUCCION DE BUZONES


12.02.06.01 CONSTRUCCION DE BUZONES DN=1.20M, H=1.2 @1.50m Und 537.00 8.00 1,453.31 11,626.48

TAMAÑA
BZ-459 h=1.38 1.00
BZ-458 h=1.25 1.00
BZ-457 h=1.50 1.00
BZ-456 h=1.40 1.00
BZ-H h=1.40 1.00
BZ-E h=1.40 1.00
BZ-B h=1.20 1.00
BZ-A h=1.20 1.00

CHICHILIN
BZCHI 62A h=1.40
BZCHI 62 h=1.40
BZCHI 63B h=1.20
BZCHI 63A h=1.20
BZCHI 63 h=1.20
BZCHI 64B h=1.20
BZCHI 64A h=1.20
BZCHI 65A h=1.20
BZCHI 65 h=1.20
BZCHI 66 h=1.20
BZCHI 67 h=1.20
BZCHI 68 h=1.20
BZCHI 74 h=1.20
BZCHI 75 h=1.20
BZCHI 76 h=1.20
BZCHI 77 h=1.40
BZCHI 78 h=1.40
BZCHI 79 h=1.40
BZCHI 80 h=1.40
BZCHI 81 h=1.40
BZCHI 82 h=1.40
BZCHI 83 h=1.40
BZCHI 84 h=1.40
BZCHI 85 h=1.40
BZCHI 86 h=1.40
BZCHI 87 h=1.40
BZCHI 88 h=1.40
BZCHI 89 h=1.40
BZCHI 90 h=1.40
BZCHI 91 h=1.40
BZCHI 92 h=1.40
BZCHI 93 h=1.40
BZ 974 h=1.40

12.02.06.02 CONSTRUCCION DE BUZONES DN=1.20M, H=1.51 @2.00m Und 65.00 2.00 1,669.55 3,339.10

TAMAÑA
BZ_D h=1.65 1.00
BZ_C h=1.65 1.00

CHICHILIN
BZCHI 71 h=2.00

12.02.06.03 CONSTRUCCION DE BUZONES DN=1.20M, H=2.01 @2.50m Und 30.00 0.00 1,646.94 0.00

COGRI
BZ - 30 H 2.43

CHICHILIN
BZCHI 50 h=2.30
BZCHI 98 h=2.40

12.02.06.04 CONSTRUCCION DE BUZONES DN=1.20M, H=2.51 @3.00m Und 30.00 2.00 1,951.04 3,902.08

TAMAÑA
BZ_G h=2.80 1.00
BZ_F h=2.65 1.00

CHICHILIN
BZCHI 70 h=2.70
BZCHI 72 h=2.70
BZCHI 73 h=2.70

12.02.06.05 CONSTRUCCION DE BUZONES DN=1.20M, H=3.01 @3.50m Und 30.00 0.00 3,296.84 0.00

COGRI
BZ-69 h=3.20

CHICHILIN
BZCHI 69 h=3.40

PPTO - CHICHILIN (SISTEMA DE ALCANTARILLADO) S/. 116,913.72

PPTO - ESCOBAYA SAN FRANCISCO ( SISTEMA DE ALCANTARILLADO)

PPTO - TAMAÑA ( SISTEMA DE ALCANTARILLADO)

PPTO - TAMAÑA ( SISTEMA DE AGUA)

PPTO TOTAL S/. 116,913.72


PREPUESUPUESTO DE PLANIFICACION PARA EL PERIODO 01/10/2021 AL 31/10/2021

METRADO COSTO
ITEM PARTIDA UNIDAD EXPEDIENTE METRADO META UNITARIO PPTO

11 SISTEMA DE AGUA POTABLE

11.02 RED DE AGUA CRUDA - ADUCCION

11.02.01 OBRAS PRELIMINARES


11.02.01.01 TRAZO Y REPLANTEO INICIAL C/EQUIPO km 19.88 0.00 803.67 0.00
11.02.02 MOVIMIENTO DE TIERRAS
11.02.02.01 EXCAVACION DE ZANJA PARA TUBERIA HDPE H=0.30M m 19,878.08 0.00 2.86 0.00
11.02.02.02 RELLENO PROTECTOR A=0.60M, MAT/PROPIO CONDUCCION m 19,878.08 0.00 11.95 0.00
11.02.03 TUBERIA DE AGUA POTABLE HDPE
11.02.03.04 SUMINISTRO DE TUBERIA HDPE ISO 4427 PN 10, DN 110MM m 8,228.61 0.00 18.18 0.00
11.02.03.09 INSTALACION DE TUBERIA HDPE ISO 4427 PN 10, DN 110MM m 8,228.61 0.00 5.81 0.00
11.02.03.11 PRUEBA HIDRAULICA A ZANJA ABIERTA Y DESINFECCION DE TUBERIA AGUA POTAB m 19,878.08 0.00 3.26 0.00
11.02.03.12 PRUEBA HIDRAULICA A ZANJA TAPADA Y DESINFECCION DE TUBERIA AGUA POTAB m 19,878.08 0.00 3.26 0.00

12 SISTEMA DE ALCANTARILLADO
12.01 RED DE DESAGUE - COLECTORES PRIMARIOS
12.02.02 MOVIMIENTO DE TIERRAS
12.01.02.01 EXCAVACION C/EQUIPO T.NORMAL H=1.50M, P/TUB DN 200MM DESAGUE m 6,177.12 233.00 14.12 3,289.96

ESCOABYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66

12.01.02.04 EXCAVACION C/EQUIPO T.NORMAL H=2.00M, P/TUB DN 200MM DESAGUE m 4,770.76 18.01 0.00

ESCOABYA - SAN FRANCISCO

12.01.02.04 EXCAVACION C/EQUIPO T.NORMAL H=2.50M, P/TUB DN 200MM DESAGUE 13.45 19.21 258.37

ESCOABYA - SAN FRANCISCO


BZ 846@BZ 847, h=2.35, h =2.36 13.45

12.01.02.10 EXCAVACION C/EQUIPO T.NORMAL H=3.00M, P/TUB DN 200MM DESAGUE m 1,507.77 80.48 20.60 1,657.89

ESCOBAYA - SAN FRANCISCO


BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71

12.02.03.13 EXCAVACION C/EQUIPO T.NORMAL H=3.50M, P/TUB DN 200MM DESAGUE m 300.53 311.82 21.40 6,672.95

ESCOBAYA - SAN FRANCISCO


BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45

12.02.03.16 EXCAVACION C/EQUIPO T.NORMAL H=4.00M, P/TUB DN 200MM DESAGUE m 173.12 21.80 0.00

ESCOBAYA - SAN FRANCISCO

12.02.03.19 EXCAVACION C/EQUIPO T.NORMAL H=4.50M, P/TUB DN 200MM DESAGUE m 258.20 34.29 22.26 763.30

ESCOBAYA - SAN FRANCISCO


BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45

12.02.03.22 EXCAVACION C/EQUIPO T.NORMAL H=5.00M, P/TUB DN 200MM DESAGUE m 156.33 78.25 24.22 1,895.22
ESCOBAYA - SAN FRANCISCO
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.02.55 REFINE Y NIVELACION ZANJA T.NORMAL, P/DESAGUE m 17,490.58 751.29 2.79 2,096.10

ESCOBAYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66
BZ 846@BZ 847, h=2.35, h =2.36 13.45
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.02.58 CAMA DE ARENA EN ZANJA H=0.10M, A=0.60M m 18,219.35 751.29 7.09 5,326.65

ESCOBAYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66
BZ 846@BZ 847, h=2.35, h =2.36 13.45
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.02.59 RELLENO PROTECTOR C/MAT PROPIO P/TUB 200MM, H=0.30M m 18,219.35 751.29 5.35 4,019.40

ESCOBAYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66
BZ 846@BZ 847, h=2.35, h =2.36 13.45
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.02.60 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=1.50M m 6,434.50 233.00 3.81 887.73

ESCOBAYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66

12.01.02.61 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=2.00M m 4,969.54 6.25 0.00

ESCOBAYA - SAN FRANCISCO

12.01.02.62 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=2.50M m 4,969.54 13.45 7.25 97.51

ESCOBAYA - SAN FRANCISCO


BZ 846@BZ 847, h=2.35, h =2.36 13.45

12.01.02.63 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=3.00M m 1,570.59 80.48 7.25 583.48

ESCOBAYA - SAN FRANCISCO


BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71

12.01.02.64 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=3.50M m 1,570.59 311.82 5.84 1,821.03

ESCOBAYA - SAN FRANCISCO


BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45

12.01.02.65 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=4.00M m 463.77 7.80 0.00
ESCOBAYA - SAN FRANCISCO

12.01.02.66 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=4.50M m 403.04 34.29 0.00
ESCOBAYA - SAN FRANCISCO
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45

12.01.02.67 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=5.00M m 123.78 78.25 8.87 694.08
ESCOBAYA - SAN FRANCISCO
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.03 TUBERIA DE DESAGUE


12.01.03.01 SUMINISTRO DE TUBERIA ISO 4435 S-25 DN 200MM U/FLEXIBLE m 18,219.35 751.29 26.85 20,172.14

ESCOBAYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66
BZ 846@BZ 847, h=2.35, h =2.36 13.45
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.03.02 INSTALACION DE TUBERIA ISO 4435 S-25 DN=200MM m 18,219.35 751.29 4.28 3,215.52

ESCOBAYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66
BZ 846@BZ 847, h=2.35, h =2.36 13.45
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.03.03 PRUEBA HIDRAULICA PARCIAL A ZANJA DESCUBIERTA DE TUBERIA PVC/ISO 4435 m 18,219.35 751.29 1.99 1,495.07

ESCOBAYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66
BZ 846@BZ 847, h=2.35, h =2.36 13.45
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.03.04 PRUEBA HIDRAULICA FINAL A ZANJA TAPADA DE TUBERIA PVC/ISO 4435 DN=200MM m 18,219.35 751.29 1.99 1,495.07

ESCOBAYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66
BZ 846@BZ 847, h=2.35, h =2.36 13.45
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.04 EXCAVACIONES DE BUZONES

12.01.04.01 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=1.50M und 281.00 39.00 118.11 4,606.29

ESCOBAYA - SAN FRANCISCO


BZ 790 h=1.20 1.00
BZ 789 h=1.20 1.00
BZ 788 h=1.20 1.00
BZ 787 h=1.20 1.00
BZ 786 h=1.20 1.00
BZ 785 h=1.20 1.00
BZ 784 h=1.20 1.00
BZ 783 h=1.20 1.00
BZ 782 h=1.20 1.00
BZ 777-11A, h=1.20 1.00

12.01.04.02 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=2.00M und 108.00 0.00 128.83 0.00

ESCOBAYA - SAN FRANCISCO

12.01.04.03 EXCAVACION BUZON, Dexc.=2.01M, HASTA H=2.50M und 59.00 2.00 141.74 283.48

ESCOBAYA - SAN FRANCISCO


BZ 846 h=2.35 1.00
BZ 847 h=2.36 1.00

12.01.04.04 EXCAVACION BUZON, Dexc.=2.50M, HASTA H=3.00M und 25.00 4.00 157.48 629.92

ESCOBAYA - SAN FRANCISCO


BZ 848 h=2.65 1.00
BZ 840, h=2.53 1.00
BZ 841 h=2.79 1.00
BZ 776-52 h=2.83 1.00

12.01.04.05 EXCAVACION BUZON, Dexc.=1.90M, HASTA H=3.50M und 20.00 6.00 177.17 1,063.02

ESCOBAYA - SAN FRANCISCO


BZ 842 h=3.28 1.00
BZ 843 h=3.31 1.00
BZ 844 h=3.30 1.00
BZ 845 h=3.37 1.00
BZ 781 h=3.08 1.00
BZ 780 h=3.32 1.00

12.01.04.06 EXCAVACION BUZON, Dexc.=1.90M, HASTA H=4.00M und 14.00 4.00 202.40 809.60
ESCOBAYA - SAN FRANCISCO
BZ A-19, h =3.72 1.00
BZ A-13, h=3.66 1.00
BZ A-14, h=3.69 1.00
BZ A-15, h =3.80 1.00

12.01.04.07 EXCAVACION BUZON, Dexc.=1.90M, HASTA H=4.50M und 11.00 4.00 236.22 944.88

ESCOBAYA - SAN FRANCISCO


BZ A-18, h =4.67 1.00
BZ A-16, h =6.99 1.00
BZ A-17, h =7.83 1.00
BZ 776- Q,h=4.24 1.00

12.01.05 CONSTRUCCION DE BUZONES


12.01.05.01 CONSTRUCCION DE BUZONES DN=1.20M, H=1.2 @1.50m und 281.00 10.00 1,453.31 14,533.10

ESCOBAYA - SAN FRANCISCO


BZ 790 h=1.20 1.00
BZ 789 h=1.20 1.00
BZ 788 h=1.20 1.00
BZ 787 h=1.20 1.00
BZ 786 h=1.20 1.00
BZ 785 h=1.20 1.00
BZ 784 h=1.20 1.00
BZ 783 h=1.20 1.00
BZ 782 h=1.20 1.00
BZ 777-11A, h=1.20 1.00

12.01.05.02 CONSTRUCCION DE BUZONES DN=1.20M, H=1.51 @2.00m und 108.00 0.00 1,669.55 0.00

ESCOBAYA - SAN FRANCISCO

12.01.05.03 CONSTRUCCION DE BUZONES DN=1.20M, H=2.01 @2.50m und 59.00 2.00 1,646.94 3,293.88

ESCOBAYA - SAN FRANCISCO


BZ 846 h=2.35 1.00
BZ 847 h=2.36 1.00

12.01.05.04 CONSTRUCCION DE BUZONES DN=1.20M, H=2.51 @3.00m und 25.00 4.00 1,951.04 7,804.16

ESCOBAYA - SAN FRANCISCO


BZ 848 h=2.65 1.00
BZ 840, h=2.53 1.00
BZ 841 h=2.79 1.00
BZ 776-52 h=2.83 1.00

12.01.05.05 CONSTRUCCION DE BUZONES DN=1.50M, H=3.01 @3.50m und 20.00 6.00 3,296.84 19,781.04
ESCOBAYA - SAN FRANCISCO
BZ 842 h=3.28 1.00
BZ 843 h=3.31 1.00
BZ 844 h=3.30 1.00
BZ 845 h=3.37 1.00
BZ 781 h=3.08 1.00
BZ 780 h=3.32 1.00

12.01.05.06 CONSTRUCCION DE BUZONES DN=1.50M, H=3.51 @4.00m und 14.00 4.00 3,526.15 14,104.60
ESCOBAYA - SAN FRANCISCO
BZ A-19, h =3.72 1.00
BZ A-13, h=3.66 1.00
BZ A-14, h=3.69 1.00
BZ A-15, h =3.80 1.00

12.01.05.07 CONSTRUCCION DE BUZONES DN=1.50M, H=4.01 @4.50m und 11.00 4.00 3,683.83 14,735.32
ESCOBAYA - SAN FRANCISCO
BZ A-18, h =4.67 1.00
BZ A-16, h =6.99 1.00
BZ A-17, h =7.83 1.00
BZ 776- Q,h=4.24 1.00

12.01.05.16 ANCLAJE O DADOS DE CONCRETO F´c=140KG/CM2 EN BUZONES und 1,104.00 60.00 29.05 1,743.00

12.02 RED DE DESAGUE - COLECTORES SECUNDARIOS


12.02.03 MOVIMIENTO DE TIERRAS
12.02.03.01 EXCAVACION C/EQUIPO T.NORMAL H=1.50M, P/TUB DN 200MM DESAGUE m 12,839.66 0.00 14.12 0.00

COLOHUACHE
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20
CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

12.02.03.04 EXCAVACION C/EQUIPO T.NORMAL H=2.00M, P/TUB DN 200MM DESAGUE m 3,277.18 0.00 18.01 0.00

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20 h=1.65
BZCHI 51 @ BZCHI 52 h=1.60, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=2.00
BZCHI 76 @ BZCHI 77 h=2.00, h=1.40

12.02.03.07 EXCAVACION C/EQUIPO T.NORMAL H=2.50M, P/TUB DN 200MM DESAGUE m 1,795.40 0.00 19.21 0.00

CHICHILIN

12.02.03.10 EXCAVACION C/EQUIPO T.NORMAL H=3.00M, P/TUB DN 200MM DESAGUE m 1,085.93 0.00 20.60 0.00

COLOHUACHE

CHICHILIN
BZCHI 70 @ BZCHI 71 h=2.70, h=2.00
BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

12.02.03.13 EXCAVACION C/EQUIPO T.NORMAL H=3.50M, P/TUB DN 200MM DESAGUE m 1,085.93 0.00 21.40 0.00

CHICHILIN
BZCHI 68 @ BZCHI 69 h=1.20, h=3.40
BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.03.35 REFINE Y NIVELACION ZANJA T.NORMAL, P/DESAGUE m 20,074.25 0.00 2.79 0.00

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20
BZ 778 B@ BZ 778 C h=1.20, h=2.65
BZ 778 C @ BZ 778 D h=2.65 h =1.60
BZ 778D @ BZ 778 D1 h=1.60 h =1.80
BZ 778D1 @ BZ 778 E h=1.80 h =1.20

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.03.38 CAMA DE ARENA EN ZANJA H=0.10M, A=0.60M m 28,677.50 0.00 7.09 0.00

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20
BZ 778 B@ BZ 778 C h=1.20, h=2.65
BZ 778 C @ BZ 778 D h=2.65 h =1.60
BZ 778D @ BZ 778 D1 h=1.60 h =1.80
BZ 778D1 @ BZ 778 E h=1.80 h =1.20

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.03.39 RELLENO PROTECTOR C/MAT PROPIO P/TUB 200MM, H=0.30M m 28,677.50 0.00 5.35 0.00

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20
BZ 778 B@ BZ 778 C h=1.20, h=2.65
BZ 778 C @ BZ 778 D h=2.65 h =1.60
BZ 778D @ BZ 778 D1 h=1.60 h =1.80
BZ 778D1 @ BZ 778 E h=1.80 h =1.20

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.03.40 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=1.50M m 18,342.37 0.00 3.81 0.00
COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

12.02.03.41 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=2.00M m 4,681.68 0.00 6.25 0.00

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20 h=1.65

CHICHILIN

12.02.03.42 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=2.50M m 2,564.85 0.00 7.25 0.00

12.02.03.43 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=3.00M m 1,551.33 0.00 7.25 0.00

COLOHUACHE
BZ 778 B@ BZ 778 C h=1.20, h=2.65
BZ 778 C @ BZ 778 D h=2.65 h =1.60
BZ 778D @ BZ 778 D1 h=1.60 h =1.80
BZ 778D1 @ BZ 778 E h=1.80 h =1.20
CHICHILIN
BZCHI 70 @ BZCHI 71 h=2.70, h=2.00
BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

12.02.03.43 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=3.50M m 0.00

CHICHILIN
BZCHI 68 @ BZCHI 69 h=1.20, h=3.40
BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.04 TUBERIA DE DESAGUE


12.02.04.01 SUMINISTRO DE TUBERIA ISO 4435 S-25 DN 200MM U/FLEXIBLE m 28,677.50 0.00 26.85 0.00

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20
BZ 778 B@ BZ 778 C h=1.20, h=2.65
BZ 778 C @ BZ 778 D h=2.65 h =1.60
BZ 778D @ BZ 778 D1 h=1.60 h =1.80
BZ 778D1 @ BZ 778 E h=1.80 h =1.20

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.04.02 INSTALACION DE TUBERIA ISO 4435 S-25 DN=200MM m 28,677.50 0.00 4.28 0.00

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20
BZ 778 B@ BZ 778 C h=1.20, h=2.65
BZ 778 C @ BZ 778 D h=2.65 h =1.60
BZ 778D @ BZ 778 D1 h=1.60 h =1.80
BZ 778D1 @ BZ 778 E h=1.80 h =1.20

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.04.03 PRUEBA HIDRAULICA PARCIAL A ZANJA DESCUBIERTA DE TUBERIA PVC/ISO 4435 m 28,677.50 0.00 1.99 0.00

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20
BZ 778 B@ BZ 778 C h=1.20, h=2.65
BZ 778 C @ BZ 778 D h=2.65 h =1.60
BZ 778D @ BZ 778 D1 h=1.60 h =1.80
BZ 778D1 @ BZ 778 E h=1.80 h =1.20

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.04.04 PRUEBA HIDRAULICA FINAL A ZANJA TAPADA DE TUBERIA PVC/ISO 4435 DN=200MM m 28,677.50 0.00 1.99 0.00

COLOHUACHE
BZ 778 A @ BZ 778 B h=1.20
BZ 778 E @ BZ 778 G h=1.20, H=1.30
BZ 778 G@ BZ 778 H h=1.30, H=1.20
BZ 778 H @ BZ 778 K h=1.20, H=1.20
BZ 778 K@ BZ 778 L h=1.20, H=1.50
BZ 778 L@ BZ 776-23 h=1.50, H=1.20
BZ 778 B@ BZ 778 C h=1.20, h=2.65
BZ 778 C @ BZ 778 D h=2.65 h =1.60
BZ 778D @ BZ 778 D1 h=1.60 h =1.80
BZ 778D1 @ BZ 778 E h=1.80 h =1.20

CHICHILIN
BZCHI 60 @ BZCHI 61C h=1.20, h=1.20
BZCHI 61C@ BZCHI 61B h=1.20, h=1.20
BZCHI 61B @ BZCHI 61A h=1.20, h=1.20
BZCHI 61A @ BZCHI 61 h=1.20, h=1.20
BZCHI 61 @ BZCHI 62B h=1.20, h=1.20
BZCHI 62B @ BZCHI 62A h=1.20, h=1.40
BZCHI 62A @ BZCHI 62 h=1.40, h=1.40
BZCHI 62 @ BZCHI 63B h=1.40, h=1.20
BZCHI 63B @ BZCHI 63A h=1.20, h=1.20
BZCHI 63A @ BZCHI 63 h=1.20, h=1.20
BZCHI 63 @ BZCHI 64B h=1.20, h=1.20
BZCHI 64B @ BZCHI 64A h=1.20, h=1.20
BZCHI 64A @ BZCHI 65A h=1.20, h=1.20
BZCHI 65A @ BZCHI 65 h=1.20, h=1.20
BZCHI 65 @ BZCHI 66 h=1.20, h=1.20
BZCHI 66 @ BZCHI 67 h=1.20, h=1.20
BZCHI 67 @ BZCHI 68 h=1.20, h=1.20
BZCHI 74 @ BZCHI 75 h=1.20, h=1.20
BZCHI 75 @ BZCHI 76 h=1.20, h=1.20
BZCHI 76 @ BZCHI 77 h=1.20, h=1.20
BZCHI 77 @ BZCHI 78 h=1.40, h=1.40
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40
BZCHI 93 @ BZ 974 h=1.40, h=1.40

BZCHI 70 @ BZCHI 71 h=2.70, h=2.00


BZCHI 71 @ BZCHI 72 h=2.00, h=2.70
BZCHI 72 @ BZCHI 73 h=2.70, h=2.70
BZCHI 73 @ BZCHI 74 h=2.70, h=1.20

BZCHI 68 @ BZCHI 69 h=1.20, h=3.40


BZCHI 69 @ BZCHI 70 h=3.40, h=2.70
BZCHI 64A @ BZCHI 64 h=1.20, h=3.10
BZCHI 64 @ BZCHI 65 h=3.10, h=1.20

12.02.05 EXCAVACION DE BUZONES


12.02.05.01 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=1.50M und 537.00 0.00 118.11 0.00

COGRI
BZ-24 h=1.20
BZ-25 h=1.20
BZ-27 h=1.30
BZ-33 h=1.30
BZ-33A h=1.20
BZ-34 h=1.40
BZ-129 h=1.50
BZ-28 h=1.4
BZ-35A h=1.5
BZ-36 h=1.4
BZ-127 h=1.4
BZ-128 h=1.4
BZ-38 h=1.5
BZ-39 h=1.5
BZ-40 h=1.4
BZ-41 h=1.3
BZ-36 h=1.30
BZ-42 h=1.2
BZ-32 h=1.2
BZ-31 h=1.3
BZ-45 h=1.2
BZ-44 h=1.4
BZ-46 h=1.3
BZ-47 h=1.2
BZ-48 h=1.2
BZ-125 h=1.2
BZ-49 h=1.4
BZ-49A h=1.4
BZ-50 h=1.4
BZ-51 h=1.40
BZ-52 h=1.50
BZ-53 h=1.20
BZ-61 h=1.30
BZ-133 h=1.30
BZ-62 h=1.30
BZ-63 h=1.50
BZ-65 h=1.40
BZ-66A h=1.40
BZ-66 h=1.30
BZ-68A h=1.40
BZ-55 h=1.2
BZ-123 h=1.20
BZ-558 h=1.20
BZ-558A h=1.2
BZ-558B h=1.2
BZ-558C h=1.20

CHICHILIN
BZCHI 62A h=1.40
BZCHI 62 h=1.40
BZCHI 63B h=1.20
BZCHI 63A h=1.20
BZCHI 63 h=1.20
BZCHI 64B h=1.20
BZCHI 64A h=1.20
BZCHI 65A h=1.20
BZCHI 65 h=1.20
BZCHI 66 h=1.20
BZCHI 67 h=1.20
BZCHI 68 h=1.20
BZCHI 74 h=1.20
BZCHI 75 h=1.20
BZCHI 76 h=1.20
BZCHI 77 h=1.40
BZCHI 78 h=1.40
BZCHI 79 h=1.40
BZCHI 80 h=1.40
BZCHI 81 h=1.40
BZCHI 82 h=1.40
BZCHI 83 h=1.40
BZCHI 84 h=1.40
BZCHI 85 h=1.40
BZCHI 86 h=1.40
BZCHI 87 h=1.40
BZCHI 88 h=1.40
BZCHI 89 h=1.40
BZCHI 90 h=1.40
BZCHI 91 h=1.40
BZCHI 92 h=1.40
BZCHI 93 h=1.40
BZ 974 h=1.40

12.02.05.02 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=2.00M und 65.00 0.00 128.83 0.00

COGRI
BZ-35 h=1.60
BZ-134 h=1.60
BZ-67 h=1.60
BZ-68 h=1.80

CHICHILIN
BZCHI 71 h=2.00

12.02.05.03 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=2.50M und 31.00 0.00 141.74 0.00

COGRI
BZ - 30 H 2.43
12.02.05.04 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=3.00M und 30.00 157.48 0.00

COGRI
BZ-37 h=2.95

CHICHILIN
BZCHI 70 h=2.70
BZCHI 72 h=2.70
BZCHI 73 h=2.70

12.02.05.05 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=3.50M und 30.00 0.00 177.17 0.00

COGRI
BZ-69 h=3.20

CHICHILIN
BZCHI 69 h=3.40

12.02.06 CONSTRUCCION DE BUZONES


12.02.06.01 CONSTRUCCION DE BUZONES DN=1.20M, H=1.2 @1.50m Und 537.00 0.00 1,453.31 0.00

COGRI
BZ-24 h=1.20
BZ-25 h=1.20
BZ-27 h=1.30
BZ-33 h=1.30
BZ-33A h=1.20
BZ-34 h=1.40
BZ-129 h=1.50
BZ-28 h=1.4
BZ-35A h=1.5
BZ-36 h=1.4
BZ-127 h=1.4
BZ-128 h=1.4
BZ-38 h=1.5
BZ-39 h=1.5
BZ-40 h=1.4
BZ-41 h=1.3
BZ-36 h=1.30
BZ-42 h=1.2
BZ-32 h=1.2
BZ-31 h=1.3
BZ-45 h=1.2
BZ-44 h=1.4
BZ-46 h=1.3
BZ-47 h=1.2
BZ-48 h=1.2
BZ-125 h=1.2
BZ-49 h=1.4
BZ-49A h=1.4
BZ-50 h=1.4
BZ-51 h=1.40
BZ-52 h=1.50
BZ-53 h=1.20
BZ-61 h=1.30
BZ-133 h=1.30
BZ-62 h=1.30
BZ-63 h=1.50
BZ-65 h=1.40
BZ-66A h=1.40
BZ-66 h=1.30
BZ-68A h=1.40
BZ-55 h=1.2
BZ-123 h=1.20
BZ-558 h=1.20
BZ-558A h=1.2
BZ-558B h=1.2
BZ-558C h=1.20

CHICHILIN
BZCHI 62A h=1.40
BZCHI 62 h=1.40
BZCHI 63B h=1.20
BZCHI 63A h=1.20
BZCHI 63 h=1.20
BZCHI 64B h=1.20
BZCHI 64A h=1.20
BZCHI 65A h=1.20
BZCHI 65 h=1.20
BZCHI 66 h=1.20
BZCHI 67 h=1.20
BZCHI 68 h=1.20
BZCHI 74 h=1.20
BZCHI 75 h=1.20
BZCHI 76 h=1.20
BZCHI 77 h=1.40
BZCHI 78 h=1.40
BZCHI 79 h=1.40
BZCHI 80 h=1.40
BZCHI 81 h=1.40
BZCHI 82 h=1.40
BZCHI 83 h=1.40
BZCHI 84 h=1.40
BZCHI 85 h=1.40
BZCHI 86 h=1.40
BZCHI 87 h=1.40
BZCHI 88 h=1.40
BZCHI 89 h=1.40
BZCHI 90 h=1.40
BZCHI 91 h=1.40
BZCHI 92 h=1.40
BZCHI 93 h=1.40
BZ 974 h=1.40

12.02.06.02 CONSTRUCCION DE BUZONES DN=1.20M, H=1.51 @2.00m Und 65.00 0.00 1,669.55 0.00

COGRI
BZ-35 h=1.60
BZ-134 h=1.60
BZ-67 h=1.60
BZ-68 h=1.80

CHICHILIN
BZCHI 71 h=2.00

12.02.06.03 CONSTRUCCION DE BUZONES DN=1.20M, H=2.01 @2.50m Und 30.00 0.00 1,646.94 0.00

COGRI
BZ - 30 H 2.43

CHICHILIN
BZCHI 50 h=2.30
BZCHI 98 h=2.40

12.02.06.04 CONSTRUCCION DE BUZONES DN=1.20M, H=2.51 @3.00m Und 30.00 0.00 1,951.04 0.00

COGRI
BZ-37 h=2.95
BZ-778-C h=2.65
CHICHILIN
BZCHI 70 h=2.70
BZCHI 72 h=2.70
BZCHI 73 h=2.70

12.02.06.05 CONSTRUCCION DE BUZONES DN=1.20M, H=3.01 @3.50m Und 30.00 0.00 3,296.84 0.00

COGRI
BZ-69 h=3.20

CHICHILIN
BZCHI 69 h=3.40

PPTO - ESCOBAYA - SAN FRANCISCO (SISTEMA DE ALCANTARILLADO) S/. 140,773.74

PPTO TOTAL S/. 140,773.74


PREPUESUPUESTO DE PLANIFICACION PARA EL PERIODO 01/10/2021 AL
31/10/2021

ITEM PARTIDA UNIDAD METRADO META COSTO PPTO


UNITARIO

11 SISTEMA DE AGUA POTABLE


11.03 RED DE AGUA POTABLE - DISTRIBUCION
11.03.02 MOVIMIENTO DE TIERRAS
11.03.02.01 EXCAVACION ZANJA C/MAQUINA T. NORMAL - P/TUB 63MM, 50MM, 75MM, 90MM, 1 m 2,000.91 14.12 28,252.85
P/TUB 110MM m 442.54
P/TUB 75MM m 1,119.49
P/TUB 63MM m 438.88
11.03.02.04 REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL - P-TUB 63MM, 50MM, 75MM, m 2,000.91 3.52 7,043.20
P/TUB 110MM m 442.54
P/TUB 75MM m 1,119.49
P/TUB 63MM m 438.88
11.03.02.07 CAMA DE ARENA Y PROTECCION P-TUB 63MM, 50MM, 75MM, 90MM, 110MM, 160MM m 2,000.91 14.19 28,392.91
P/TUB 110MM m 442.54
P/TUB 75MM m 1,119.49
P/TUB 63MM m 438.88
11.03.02.08 RELLENO COMPACTADO C/MAT PROPIO TN ANCHO=0.60 H=1.20M, AGUA POTABLE m 2,000.91 10.03 20,069.13
P/TUB 110MM m 442.54
P/TUB 75MM m 1,119.49
P/TUB 63MM m 438.88
11.03.03 TUBERIA DE AGUA POTABLE PVC
11.03.03.02 SUMINISTRO DE TUBERIA PVC C-10 DN 63MM UF m 438.88 5.46 2,396.28
P/TUB 63MM m 438.88
11.03.03.03 SUMINISTRO DE TUBERIA PVC C-10 DN 75MM UF m 1,119.49 7.70 8,620.07
P/TUB 75MM 1,119.49
11.03.03.05 SUMINISTRO DE TUBERIA PVC C-10 DN 110MM UF m 442.54 16.38 7,248.81
P/TUB 110MM m 442.54
11.03.03.08 INSTALACION DE TUBERIA PVC C-10 DN 63MM UF m 438.88 6.80 2,984.38
P/TUB 63MM m 438.88
11.03.03.09 INSTALACION DE TUBERIA PVC C-10 DN 75MM UF m 1,119.49 8.50 9,515.67
P/TUB 75MM 1,119.49
11.03.03.11 INSTALACION DE TUBERIA PVC C-10 DN 110MM UF m 442.54 13.59 6,014.12
P/TUB 110MM m 442.54
11.03.03.13 PRUEBA HIDRAULICA A ZANJA TAPADA Y DESINFECCION DE TUBERIA AGUA POTA m 2,000.91 3.26 6,522.97
P/TUB 110MM m 442.54
P/TUB 75MM m 1,119.49
P/TUB 63MM m 438.88

12 SISTEMA DE ALCANTARILLADO
12.01 RED DE DESAGUE - COLECTORES PRIMARIOS
12.02.02 MOVIMIENTO DE TIERRAS
12.01.02.01 EXCAVACION C/EQUIPO T.NORMAL H=1.50M, P/TUB DN 200MM DESAGUE m 233.00 14.12 3,289.96

ESCOABYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66

12.01.02.05 EXCAVACION C/EQUIPO T.NORMAL H=2.50M, P/TUB DN 200MM DESAGUE 13.45 19.21 258.37

ESCOABYA - SAN FRANCISCO


BZ 846@BZ 847, h=2.35, h =2.36 13.45

12.01.02.10 EXCAVACION C/EQUIPO T.NORMAL H=3.00M, P/TUB DN 200MM DESAGUE m 80.48 20.60 1,657.89

ESCOBAYA - SAN FRANCISCO


BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71

12.02.03.13 EXCAVACION C/EQUIPO T.NORMAL H=3.50M, P/TUB DN 200MM DESAGUE m 311.82 21.40 6,672.95

ESCOBAYA - SAN FRANCISCO


BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45

12.02.03.19 EXCAVACION C/EQUIPO T.NORMAL H=4.50M, P/TUB DN 200MM DESAGUE m 34.29 22.26 763.30
ESCOBAYA - SAN FRANCISCO
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45

12.02.03.22 EXCAVACION C/EQUIPO T.NORMAL H=5.00M, P/TUB DN 200MM DESAGUE m 78.25 24.22 1,895.22
ESCOBAYA - SAN FRANCISCO
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.02.55 REFINE Y NIVELACION ZANJA T.NORMAL, P/DESAGUE m 751.29 2.79 2,096.10

ESCOBAYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66
BZ 846@BZ 847, h=2.35, h =2.36 13.45
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.02.58 CAMA DE ARENA EN ZANJA H=0.10M, A=0.60M m 751.29 7.09 5,326.65

ESCOBAYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66
BZ 846@BZ 847, h=2.35, h =2.36 13.45
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.02.59 RELLENO PROTECTOR C/MAT PROPIO P/TUB 200MM, H=0.30M m 751.29 5.35 4,019.40

ESCOBAYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66
BZ 846@BZ 847, h=2.35, h =2.36 13.45
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.02.60 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=1.50M m 233.00 3.81 887.73

ESCOBAYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66

12.01.02.62 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=2.50M m 13.45 7.25 97.51

ESCOBAYA - SAN FRANCISCO


BZ 846@BZ 847, h=2.35, h =2.36 13.45

12.01.02.63 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=3.00M m 80.48 7.25 583.48

ESCOBAYA - SAN FRANCISCO


BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71

12.01.02.64 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=3.50M m 311.82 5.84 1,821.03

ESCOBAYA - SAN FRANCISCO


BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45

12.01.02.66 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=4.50M m 34.29 0.00


ESCOBAYA - SAN FRANCISCO
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45

12.01.02.67 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=5.00M m 78.25 8.87 694.08
ESCOBAYA - SAN FRANCISCO
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.03 TUBERIA DE DESAGUE


12.01.03.01 SUMINISTRO DE TUBERIA ISO 4435 S-25 DN 200MM U/FLEXIBLE m 751.29 26.85 20,172.14

ESCOBAYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66
BZ 846@BZ 847, h=2.35, h =2.36 13.45
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.03.02 INSTALACION DE TUBERIA ISO 4435 S-25 DN=200MM m 751.29 4.28 3,215.52

ESCOBAYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66
BZ 846@BZ 847, h=2.35, h =2.36 13.45
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.03.03 PRUEBA HIDRAULICA PARCIAL A ZANJA DESCUBIERTA DE TUBERIA PVC/ISO 4435 m 751.29 1.99 1,495.07

ESCOBAYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66
BZ 846@BZ 847, h=2.35, h =2.36 13.45
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.03.04 PRUEBA HIDRAULICA FINAL A ZANJA TAPADA DE TUBERIA PVC/ISO 4435 DN=200M m 751.29 1.99 1,495.07

ESCOBAYA - SAN FRANCISCO


BZ 790@ BZ 789 h=1.20, h =1.20 28.36
BZ 789@ BZ 788 h=1.20, h =1.20 20.78
BZ 788@ BZ 787 h=1.20, h =1.20 16.65
BZ 787@ BZ 786 h=1.20, h =1.20 12.03
BZ 786@ BZ 785 h=1.20, h =1.20 18.14
BZ 785@ BZ 784 h=1.20, h =1.20 34.67
BZ 784@ BZ 783 h=1.20, h =1.20 57.71
BZ 783@ BZ 782 h=1.20, h =1.20 44.66
BZ 846@BZ 847, h=2.35, h =2.36 13.45
BZ _A_11@ BZ _A_12 h=2.70, h=2.65 10.76
BZ 848@BZ 849, h=2.65, h =1.60 23.04
BZ 847@BZ 848, h=2.36, h =2.65 34.97
BZ 840@ BZ 841, h=2.53, h =2.79 11.71
BZ _A_19@ BZ _A_20 h=3.33, h=1.36 11.23
BZ _A_12@ BZ _A_13 h=2.65, h=3.39 20.28
BZ _A_13@ BZ _A_14 h=3.39, h=3.41 8.23
BZ _A_14@ BZ _A_15 h=3.41, h=3.44 12.41
BZ 842@BZ 843, h=3.28, h =3.31 15.84
BZ 843@BZ 844, h=3.31, h =3.30 28.04
BZ 844@BZ 845, h=3.30, h =3.37 16.69
BZ 845@BZ 846, h=3.37, h =2.35 20.55
BZ 841 @ BZ 842, h=2.79, h =3.28 20.95
BZ 776-52 @ BZ 780 h=2.83, h =3.32 63.82
BZ 782@ BZ 781 h=1.20, h =3.08 38.33
BZ 781@ BZ 780 h=3.08, h =3.32 55.45
BZ _A_18@ BZ _A_19 h=4.25, h=3.33 4.84
BZ 776-Q @ BZ 776-52 h=4.24, h =2.83 29.45
BZ _A_15@ BZ _A_16 h=3.44, h=6.64 32.96
BZ _A_16@ BZ _A_17 h=6.64, h=7.47 29.47
BZ _A_17@ BZ _A_18 h=7.47, h=4.25 15.82

12.01.04 EXCAVACIONES DE BUZONES

12.01.04.01 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=1.50M und 10.00 118.11 1,181.10

ESCOBAYA - SAN FRANCISCO


BZ 790 h=1.20 1.00
BZ 789 h=1.20 1.00
BZ 788 h=1.20 1.00
BZ 787 h=1.20 1.00
BZ 786 h=1.20 1.00
BZ 785 h=1.20 1.00
BZ 784 h=1.20 1.00
BZ 783 h=1.20 1.00
BZ 782 h=1.20 1.00
BZ 777-11A, h=1.20 1.00

12.01.04.03 EXCAVACION BUZON, Dexc.=2.01M, HASTA H=2.50M und 2.00 141.74 283.48

ESCOBAYA - SAN FRANCISCO


BZ 846 h=2.35 1.00
BZ 847 h=2.36 1.00

12.01.04.04 EXCAVACION BUZON, Dexc.=2.50M, HASTA H=3.00M und 4.00 157.48 629.92

ESCOBAYA - SAN FRANCISCO


BZ 848 h=2.65 1.00
BZ 840, h=2.53 1.00
BZ 841 h=2.79 1.00
BZ 776-52 h=2.83 1.00

12.01.04.05 EXCAVACION BUZON, Dexc.=1.90M, HASTA H=3.50M und 6.00 177.17 1,063.02

ESCOBAYA - SAN FRANCISCO


BZ 842 h=3.28 1.00
BZ 843 h=3.31 1.00
BZ 844 h=3.30 1.00
BZ 845 h=3.37 1.00
BZ 781 h=3.08 1.00
BZ 780 h=3.32 1.00

12.01.04.06 EXCAVACION BUZON, Dexc.=1.90M, HASTA H=4.00M und 4.00 202.40 809.60

ESCOBAYA - SAN FRANCISCO


BZ A-19, h =3.72 1.00
BZ A-13, h=3.66 1.00
BZ A-14, h=3.69 1.00
BZ A-15, h =3.80 1.00

12.01.04.07 EXCAVACION BUZON, Dexc.=1.90M, HASTA H=4.50M und 4.00 236.22 944.88

ESCOBAYA - SAN FRANCISCO


BZ A-18, h =4.67 1.00
BZ A-16, h =6.99 1.00
BZ A-17, h =7.83 1.00
BZ 776- Q,h=4.24 1.00

12.01.05 CONSTRUCCION DE BUZONES


12.01.05.01 CONSTRUCCION DE BUZONES DN=1.20M, H=1.2 @1.50m und 10.00 1,453.31 14,533.10

ESCOBAYA - SAN FRANCISCO


BZ 790 h=1.20 1.00
BZ 789 h=1.20 1.00
BZ 788 h=1.20 1.00
BZ 787 h=1.20 1.00
BZ 786 h=1.20 1.00
BZ 785 h=1.20 1.00
BZ 784 h=1.20 1.00
BZ 783 h=1.20 1.00
BZ 782 h=1.20 1.00
BZ 777-11A, h=1.20 1.00

12.01.05.03 CONSTRUCCION DE BUZONES DN=1.20M, H=2.01 @2.50m und 2.00 1,646.94 3,293.88

ESCOBAYA - SAN FRANCISCO


BZ 846 h=2.35 1.00
BZ 847 h=2.36 1.00

12.01.05.04 CONSTRUCCION DE BUZONES DN=1.20M, H=2.51 @3.00m und 4.00 1,951.04 7,804.16

ESCOBAYA - SAN FRANCISCO


BZ 848 h=2.65 1.00
BZ 840, h=2.53 1.00
BZ 841 h=2.79 1.00
BZ 776-52 h=2.83 1.00

12.01.05.05 CONSTRUCCION DE BUZONES DN=1.50M, H=3.01 @3.50m und 6.00 3,296.84 19,781.04
ESCOBAYA - SAN FRANCISCO
BZ 842 h=3.28 1.00
BZ 843 h=3.31 1.00
BZ 844 h=3.30 1.00
BZ 845 h=3.37 1.00
BZ 781 h=3.08 1.00
BZ 780 h=3.32 1.00

12.01.05.06 CONSTRUCCION DE BUZONES DN=1.50M, H=3.51 @4.00m und 4.00 3,526.15 14,104.60
ESCOBAYA - SAN FRANCISCO
BZ A-19, h =3.72 1.00
BZ A-13, h=3.66 1.00
BZ A-14, h=3.69 1.00
BZ A-15, h =3.80 1.00

12.01.05.07 CONSTRUCCION DE BUZONES DN=1.50M, H=4.01 @4.50m und 4.00 3,683.83 14,735.32
ESCOBAYA - SAN FRANCISCO
BZ A-18, h =4.67 1.00
BZ A-16, h =6.99 1.00
BZ A-17, h =7.83 1.00
BZ 776- Q,h=4.24 1.00

12.01.05.16 ANCLAJE O DADOS DE CONCRETO F´c=140KG/CM2 EN BUZONES und 8.00 29.05 232.40

12.02 RED DE DESAGUE - COLECTORES SECUNDARIOS


12.02.03 MOVIMIENTO DE TIERRAS
12.02.03.01 EXCAVACION C/EQUIPO T.NORMAL H=1.50M, P/TUB DN 200MM DESAGUE m 2,198.93 14.12 31,048.89

COGRI
BZ 36@ BZ 127 h=1.40, H=1.40 63.10
BZ 127@ BZ 128 h=1.40, H=1.40 39.76
BZ 38@ BZ 39 h=1.50, H=1.50 68.54
BZ 39@ BZ 41 h=1.50, H=1.30 64.74
BZ 41@ BZ 36 h=1.30, H=1.30 50.62
BZ 36@ BZ 42 h=1.30, H=1.20 50.62
BZ42@ BZ 32 h=1.20, H=1.20 18.63
BZ 27 @ BZ 28 h=1.20, H=1.40 62.61
BZ 46 @ BZ 47 h=1.30, H=1.20 51.79
BZ 504@ BZ 49 h=1.30, H=1.40 14.35
BZ 49@ BZ 49A h=1.40, H=1.40 26.04
BZ 49A@ BZ 50 h=1.40, H=1.40 48.78
BZ 50@ BZ 51 h=1.40, H=1.40 47.37
BZ 61@ BZ 133 h=1.30, H=1.30 40.07
BZ 133@ BZ 62 h=1.30, H=1.30 39.19
BZ 62@ BZ 63 h=1.30, H=1.50 78.86
BZ 63@ BZ 66 h=1.50, H=1.30 60.08
BZ 65@ BZ 66A h=1.40, H=1.40 47.54
BZ 66A@ BZ 66 h=1.40, H=1.30 49.04
BZ 66@ BZ 55 h=1.30, H=1.20 18.92

ACHICARI - HUASALÓN
BZ_P1 @ BZ_P2 h=1.20, h=1.20 16.54
BZ_P2 @ BZ_P3 h=1.20, h=1.20 16.21
BZ_P3 @ BZ_P4 h=1.20, h=1.20 16.28
BZ_P4 @ BZ_P5 h=1.20, h=1.20 20.69
BZ_P5 @ BZ_P6 h=1.20, h=1.20 54.51
BZ_P6 @ BZ_P7 h=1.20, h=1.20 39.96
BZ_P7 @ BZ_P8 h=1.20, h=1.20 22.62
BZ_P8 @ BZ_P9 h=1.20, h=1.20 11.74
BZ_P9 @ BZ_P10 h=1.20, h=1.20 31.57
BZ_P10 @ BZ_P11 h=1.20, h=1.20 12.36
BZ_P11 @ BZ_P12 h=1.20, h=1.20 14.37
BZ_P12 @ BZ_P13 h=1.20, h=1.20 23.58
BZ_P13 @ BZ_P14 h=1.20, h=1.20 47.82
BZ_P14 @ BZ_P15 h=1.20, h=1.20 17.13
BZ_P15 @ BZ_P16 h=1.20, h=1.20 35.88
BZ_P16 @ BZ_P17 h=1.20, h=1.20 23.51
BZ_P17 @ BZ_P18 h=1.20, h=1.20 9.13
BZ_P18 @ BZ_P19 h=1.20, h=1.20 10.09
BZ_P19 @ BZ_P20 h=1.20, h=1.20 35.04
BZ_P20 @ BZ_P21 h=1.20, h=1.20 43.61
BZ_P21 @ BZ_P22 h=1.20, h=1.20 38.07
BZ_P22 @ BZ_P23 h=1.20, h=1.20 33.98
BZ_P23 @ BZ_P24 h=1.20, h=1.20 34.81

CHICHILIN
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 76.06
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 22.61
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.75

12.02.03.04 EXCAVACION C/EQUIPO T.NORMAL H=2.00M, P/TUB DN 200MM DESAGUE m 286.39 18.01 5,157.88

COGRI
BZ 134@ BZ 65 h=1.60, H=1.40 77.83
BZ 35 @ BZ 36 h=1.60, H=1.40 68.28
BZ 67@ BZ 68 h=1.60, H=1.80 58.00
BZ 68@ BZ 68A h=1.80, H=1.40 50.59

CHICHILÍN
BZCHI 75 @ BZCHI 76 h=1.20, h=2.00 31.69

12.02.03.10 EXCAVACION C/EQUIPO T.NORMAL H=3.00M, P/TUB DN 200MM DESAGUE m 259.71 20.60 5,350.03

COGRI
BZ 37 @ BZ 30 h=2.95, H=2.43 23.86
BZ 30 @ BZ 31 h=2.43, H=2.60 21.63
BZ 28 @ BZ 37 h=1.40, H=2.95 68.03
BZ32@ BZ 31 h=1.20, H=2.60 10.88
BZ 128@ BZ 37 h=1.40, H=2.95 61.04
CHICHILIN
BZCHI 76 @ BZCHI 77 h=2.00, h=2.85 37.29
BZCHI 77 @ BZCHI 78 h=2.85, h=1.40 36.98

12.02.03.13 EXCAVACION C/EQUIPO T.NORMAL H=3.50M, P/TUB DN 200MM DESAGUE m 84.93 21.40 1,817.50

COGRI
BZ 55@ BZ 69 h=1.20, H=3.20 43.83
BZ 68A@ BZ 69 h=1.40, H=3.20 6.93
BZ 69@ BZ 8 h=3.20, H=1.40 34.17

12.02.03.35 REFINE Y NIVELACION ZANJA T.NORMAL, P/DESAGUE m 2,829.96 2.79 7,895.59

COGRI
BZ 36@ BZ 127 h=1.40, H=1.40 63.10
BZ 127@ BZ 128 h=1.40, H=1.40 39.76
BZ 38@ BZ 39 h=1.50, H=1.50 68.54
BZ 39@ BZ 41 h=1.50, H=1.30 64.74
BZ 41@ BZ 36 h=1.30, H=1.30 50.62
BZ 36@ BZ 42 h=1.30, H=1.20 50.62
BZ42@ BZ 32 h=1.20, H=1.20 18.63
BZ 27 @ BZ 28 h=1.20, H=1.40 62.61
BZ 46 @ BZ 47 h=1.30, H=1.20 51.79
BZ 504@ BZ 49 h=1.30, H=1.40 14.35
BZ 49@ BZ 49A h=1.40, H=1.40 26.04
BZ 49A@ BZ 50 h=1.40, H=1.40 48.78
BZ 50@ BZ 51 h=1.40, H=1.40 47.37
BZ 61@ BZ 133 h=1.30, H=1.30 40.07
BZ 133@ BZ 62 h=1.30, H=1.30 39.19
BZ 62@ BZ 63 h=1.30, H=1.50 78.86
BZ 134@ BZ 65 h=1.60, H=1.40 77.83
BZ 35 @ BZ 36 h=1.60, H=1.40 68.28
BZ 37 @ BZ 30 h=2.95, H=2.43 23.86
BZ 30 @ BZ 31 h=2.43, H=2.60 21.63
BZ 28 @ BZ 37 h=1.40, H=2.95 68.03
BZ32@ BZ 31 h=1.20, H=2.60 10.88
BZ 128@ BZ 37 h=1.40, H=2.95 61.04
BZ 63@ BZ 66 h=1.50, H=1.30 60.08
BZ 65@ BZ 66A h=1.40, H=1.40 47.54
BZ 66A@ BZ 66 h=1.40, H=1.30 49.04
BZ 66@ BZ 55 h=1.30, H=1.20 18.92
BZ 55@ BZ 69 h=1.20, H=3.20 43.83
BZ 67@ BZ 68 h=1.60, H=1.80 58.00
BZ 68@ BZ 68A h=1.80, H=1.40 50.59
BZ 68A@ BZ 69 h=1.40, H=3.20 6.93
BZ 69@ BZ 8 h=3.20, H=1.40 34.17

ACHICARI - HUASALÓN
BZ_P1 @ BZ_P2 h=1.20, h=1.20 16.54
BZ_P2 @ BZ_P3 h=1.20, h=1.20 16.21
BZ_P3 @ BZ_P4 h=1.20, h=1.20 16.28
BZ_P4 @ BZ_P5 h=1.20, h=1.20 20.69
BZ_P5 @ BZ_P6 h=1.20, h=1.20 54.51
BZ_P6 @ BZ_P7 h=1.20, h=1.20 39.96
BZ_P7 @ BZ_P8 h=1.20, h=1.20 22.62
BZ_P8 @ BZ_P9 h=1.20, h=1.20 11.74
BZ_P9 @ BZ_P10 h=1.20, h=1.20 31.57
BZ_P10 @ BZ_P11 h=1.20, h=1.20 12.36
BZ_P11 @ BZ_P12 h=1.20, h=1.20 14.37
BZ_P12 @ BZ_P13 h=1.20, h=1.20 23.58
BZ_P13 @ BZ_P14 h=1.20, h=1.20 47.82
BZ_P14 @ BZ_P15 h=1.20, h=1.20 17.13
BZ_P15 @ BZ_P16 h=1.20, h=1.20 35.88
BZ_P16 @ BZ_P17 h=1.20, h=1.20 23.51
BZ_P17 @ BZ_P18 h=1.20, h=1.20 9.13
BZ_P18 @ BZ_P19 h=1.20, h=1.20 10.09
BZ_P19 @ BZ_P20 h=1.20, h=1.20 35.04
BZ_P20 @ BZ_P21 h=1.20, h=1.20 43.61
BZ_P21 @ BZ_P22 h=1.20, h=1.20 38.07
BZ_P22 @ BZ_P23 h=1.20, h=1.20 33.98
BZ_P23 @ BZ_P24 h=1.20, h=1.20 34.81

CHICHILIN
BZCHI 75 @ BZCHI 76 h=1.20, h=2.00 31.69
BZCHI 76 @ BZCHI 77 h=2.00, h=2.85 37.29
BZCHI 77 @ BZCHI 78 h=2.85, h=1.40 36.98
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 76.06
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 22.61
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.75

12.02.03.38 CAMA DE ARENA EN ZANJA H=0.10M, A=0.60M m 2,829.96 7.09 20,064.42

COGRI
BZ 36@ BZ 127 h=1.40, H=1.40 63.10
BZ 127@ BZ 128 h=1.40, H=1.40 39.76
BZ 38@ BZ 39 h=1.50, H=1.50 68.54
BZ 39@ BZ 41 h=1.50, H=1.30 64.74
BZ 41@ BZ 36 h=1.30, H=1.30 50.62
BZ 36@ BZ 42 h=1.30, H=1.20 50.62
BZ42@ BZ 32 h=1.20, H=1.20 18.63
BZ 27 @ BZ 28 h=1.20, H=1.40 62.61
BZ 46 @ BZ 47 h=1.30, H=1.20 51.79
BZ 504@ BZ 49 h=1.30, H=1.40 14.35
BZ 49@ BZ 49A h=1.40, H=1.40 26.04
BZ 49A@ BZ 50 h=1.40, H=1.40 48.78
BZ 50@ BZ 51 h=1.40, H=1.40 47.37
BZ 61@ BZ 133 h=1.30, H=1.30 40.07
BZ 133@ BZ 62 h=1.30, H=1.30 39.19
BZ 62@ BZ 63 h=1.30, H=1.50 78.86
BZ 134@ BZ 65 h=1.60, H=1.40 77.83
BZ 35 @ BZ 36 h=1.60, H=1.40 68.28
BZ 37 @ BZ 30 h=2.95, H=2.43 23.86
BZ 30 @ BZ 31 h=2.43, H=2.60 21.63
BZ 28 @ BZ 37 h=1.40, H=2.95 68.03
BZ32@ BZ 31 h=1.20, H=2.60 10.88
BZ 128@ BZ 37 h=1.40, H=2.95 61.04
BZ 63@ BZ 66 h=1.50, H=1.30 60.08
BZ 65@ BZ 66A h=1.40, H=1.40 47.54
BZ 66A@ BZ 66 h=1.40, H=1.30 49.04
BZ 66@ BZ 55 h=1.30, H=1.20 18.92
BZ 55@ BZ 69 h=1.20, H=3.20 43.83
BZ 67@ BZ 68 h=1.60, H=1.80 58.00
BZ 68@ BZ 68A h=1.80, H=1.40 50.59
BZ 68A@ BZ 69 h=1.40, H=3.20 6.93
BZ 69@ BZ 8 h=3.20, H=1.40 34.17

ACHICARI - HUASALÓN
BZ_P1 @ BZ_P2 h=1.20, h=1.20 16.54
BZ_P2 @ BZ_P3 h=1.20, h=1.20 16.21
BZ_P3 @ BZ_P4 h=1.20, h=1.20 16.28
BZ_P4 @ BZ_P5 h=1.20, h=1.20 20.69
BZ_P5 @ BZ_P6 h=1.20, h=1.20 54.51
BZ_P6 @ BZ_P7 h=1.20, h=1.20 39.96
BZ_P7 @ BZ_P8 h=1.20, h=1.20 22.62
BZ_P8 @ BZ_P9 h=1.20, h=1.20 11.74
BZ_P9 @ BZ_P10 h=1.20, h=1.20 31.57
BZ_P10 @ BZ_P11 h=1.20, h=1.20 12.36
BZ_P11 @ BZ_P12 h=1.20, h=1.20 14.37
BZ_P12 @ BZ_P13 h=1.20, h=1.20 23.58
BZ_P13 @ BZ_P14 h=1.20, h=1.20 47.82
BZ_P14 @ BZ_P15 h=1.20, h=1.20 17.13
BZ_P15 @ BZ_P16 h=1.20, h=1.20 35.88
BZ_P16 @ BZ_P17 h=1.20, h=1.20 23.51
BZ_P17 @ BZ_P18 h=1.20, h=1.20 9.13
BZ_P18 @ BZ_P19 h=1.20, h=1.20 10.09
BZ_P19 @ BZ_P20 h=1.20, h=1.20 35.04
BZ_P20 @ BZ_P21 h=1.20, h=1.20 43.61
BZ_P21 @ BZ_P22 h=1.20, h=1.20 38.07
BZ_P22 @ BZ_P23 h=1.20, h=1.20 33.98
BZ_P23 @ BZ_P24 h=1.20, h=1.20 34.81

CHICHILIN
BZCHI 75 @ BZCHI 76 h=1.20, h=2.00 31.69
BZCHI 76 @ BZCHI 77 h=2.00, h=2.85 37.29
BZCHI 77 @ BZCHI 78 h=2.85, h=1.40 36.98
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 76.06
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 22.61
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.75

12.02.03.39 RELLENO PROTECTOR C/MAT PROPIO P/TUB 200MM, H=0.30M m 2,829.96 5.35 15,140.29

COGRI
BZ 36@ BZ 127 h=1.40, H=1.40 63.10
BZ 127@ BZ 128 h=1.40, H=1.40 39.76
BZ 38@ BZ 39 h=1.50, H=1.50 68.54
BZ 39@ BZ 41 h=1.50, H=1.30 64.74
BZ 41@ BZ 36 h=1.30, H=1.30 50.62
BZ 36@ BZ 42 h=1.30, H=1.20 50.62
BZ42@ BZ 32 h=1.20, H=1.20 18.63
BZ 27 @ BZ 28 h=1.20, H=1.40 62.61
BZ 46 @ BZ 47 h=1.30, H=1.20 51.79
BZ 504@ BZ 49 h=1.30, H=1.40 14.35
BZ 49@ BZ 49A h=1.40, H=1.40 26.04
BZ 49A@ BZ 50 h=1.40, H=1.40 48.78
BZ 50@ BZ 51 h=1.40, H=1.40 47.37
BZ 61@ BZ 133 h=1.30, H=1.30 40.07
BZ 133@ BZ 62 h=1.30, H=1.30 39.19
BZ 62@ BZ 63 h=1.30, H=1.50 78.86
BZ 134@ BZ 65 h=1.60, H=1.40 77.83
BZ 35 @ BZ 36 h=1.60, H=1.40 68.28
BZ 37 @ BZ 30 h=2.95, H=2.43 23.86
BZ 30 @ BZ 31 h=2.43, H=2.60 21.63
BZ 28 @ BZ 37 h=1.40, H=2.95 68.03
BZ32@ BZ 31 h=1.20, H=2.60 10.88
BZ 128@ BZ 37 h=1.40, H=2.95 61.04
BZ 63@ BZ 66 h=1.50, H=1.30 60.08
BZ 65@ BZ 66A h=1.40, H=1.40 47.54
BZ 66A@ BZ 66 h=1.40, H=1.30 49.04
BZ 66@ BZ 55 h=1.30, H=1.20 18.92
BZ 55@ BZ 69 h=1.20, H=3.20 43.83
BZ 67@ BZ 68 h=1.60, H=1.80 58.00
BZ 68@ BZ 68A h=1.80, H=1.40 50.59
BZ 68A@ BZ 69 h=1.40, H=3.20 6.93
BZ 69@ BZ 8 h=3.20, H=1.40 34.17

ACHICARI - HUASALÓN
BZ_P1 @ BZ_P2 h=1.20, h=1.20 16.54
BZ_P2 @ BZ_P3 h=1.20, h=1.20 16.21
BZ_P3 @ BZ_P4 h=1.20, h=1.20 16.28
BZ_P4 @ BZ_P5 h=1.20, h=1.20 20.69
BZ_P5 @ BZ_P6 h=1.20, h=1.20 54.51
BZ_P6 @ BZ_P7 h=1.20, h=1.20 39.96
BZ_P7 @ BZ_P8 h=1.20, h=1.20 22.62
BZ_P8 @ BZ_P9 h=1.20, h=1.20 11.74
BZ_P9 @ BZ_P10 h=1.20, h=1.20 31.57
BZ_P10 @ BZ_P11 h=1.20, h=1.20 12.36
BZ_P11 @ BZ_P12 h=1.20, h=1.20 14.37
BZ_P12 @ BZ_P13 h=1.20, h=1.20 23.58
BZ_P13 @ BZ_P14 h=1.20, h=1.20 47.82
BZ_P14 @ BZ_P15 h=1.20, h=1.20 17.13
BZ_P15 @ BZ_P16 h=1.20, h=1.20 35.88
BZ_P16 @ BZ_P17 h=1.20, h=1.20 23.51
BZ_P17 @ BZ_P18 h=1.20, h=1.20 9.13
BZ_P18 @ BZ_P19 h=1.20, h=1.20 10.09
BZ_P19 @ BZ_P20 h=1.20, h=1.20 35.04
BZ_P20 @ BZ_P21 h=1.20, h=1.20 43.61
BZ_P21 @ BZ_P22 h=1.20, h=1.20 38.07
BZ_P22 @ BZ_P23 h=1.20, h=1.20 33.98
BZ_P23 @ BZ_P24 h=1.20, h=1.20 34.81

CHICHILIN
BZCHI 75 @ BZCHI 76 h=1.20, h=2.00 31.69
BZCHI 76 @ BZCHI 77 h=2.00, h=2.85 37.29
BZCHI 77 @ BZCHI 78 h=2.85, h=1.40 36.98
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 76.06
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 22.61
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.75

12.02.03.40 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=1.50M m 2,198.93 3.81 8,377.92

COGRI
BZ 36@ BZ 127 h=1.40, H=1.40 63.10
BZ 127@ BZ 128 h=1.40, H=1.40 39.76
BZ 38@ BZ 39 h=1.50, H=1.50 68.54
BZ 39@ BZ 41 h=1.50, H=1.30 64.74
BZ 41@ BZ 36 h=1.30, H=1.30 50.62
BZ 36@ BZ 42 h=1.30, H=1.20 50.62
BZ42@ BZ 32 h=1.20, H=1.20 18.63
BZ 27 @ BZ 28 h=1.20, H=1.40 62.61
BZ 46 @ BZ 47 h=1.30, H=1.20 51.79
BZ 504@ BZ 49 h=1.30, H=1.40 14.35
BZ 49@ BZ 49A h=1.40, H=1.40 26.04
BZ 49A@ BZ 50 h=1.40, H=1.40 48.78
BZ 50@ BZ 51 h=1.40, H=1.40 47.37
BZ 61@ BZ 133 h=1.30, H=1.30 40.07
BZ 133@ BZ 62 h=1.30, H=1.30 39.19
BZ 62@ BZ 63 h=1.30, H=1.50 78.86
BZ 63@ BZ 66 h=1.50, H=1.30 60.08
BZ 65@ BZ 66A h=1.40, H=1.40 47.54
BZ 66A@ BZ 66 h=1.40, H=1.30 49.04
BZ 66@ BZ 55 h=1.30, H=1.20 18.92

ACHICARI - HUASALÓN
BZ_P1 @ BZ_P2 h=1.20, h=1.20 16.54
BZ_P2 @ BZ_P3 h=1.20, h=1.20 16.21
BZ_P3 @ BZ_P4 h=1.20, h=1.20 16.28
BZ_P4 @ BZ_P5 h=1.20, h=1.20 20.69
BZ_P5 @ BZ_P6 h=1.20, h=1.20 54.51
BZ_P6 @ BZ_P7 h=1.20, h=1.20 39.96
BZ_P7 @ BZ_P8 h=1.20, h=1.20 22.62
BZ_P8 @ BZ_P9 h=1.20, h=1.20 11.74
BZ_P9 @ BZ_P10 h=1.20, h=1.20 31.57
BZ_P10 @ BZ_P11 h=1.20, h=1.20 12.36
BZ_P11 @ BZ_P12 h=1.20, h=1.20 14.37
BZ_P12 @ BZ_P13 h=1.20, h=1.20 23.58
BZ_P13 @ BZ_P14 h=1.20, h=1.20 47.82
BZ_P14 @ BZ_P15 h=1.20, h=1.20 17.13
BZ_P15 @ BZ_P16 h=1.20, h=1.20 35.88
BZ_P16 @ BZ_P17 h=1.20, h=1.20 23.51
BZ_P17 @ BZ_P18 h=1.20, h=1.20 9.13
BZ_P18 @ BZ_P19 h=1.20, h=1.20 10.09
BZ_P19 @ BZ_P20 h=1.20, h=1.20 35.04
BZ_P20 @ BZ_P21 h=1.20, h=1.20 43.61
BZ_P21 @ BZ_P22 h=1.20, h=1.20 38.07
BZ_P22 @ BZ_P23 h=1.20, h=1.20 33.98
BZ_P23 @ BZ_P24 h=1.20, h=1.20 34.81

CHICHILIN
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 76.06
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 22.61
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.75

12.02.03.41 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=2.00M m 286.39 6.25 1,789.94

COGRI
BZ 134@ BZ 65 h=1.60, H=1.40 77.83
BZ 35 @ BZ 36 h=1.60, H=1.40 68.28
BZ 67@ BZ 68 h=1.60, H=1.80 58.00
BZ 68@ BZ 68A h=1.80, H=1.40 50.59

CHICHILIN

BZCHI 75 @ BZCHI 76 h=1.20, h=2.00 31.69

12.02.03.43 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=3.00M m 259.71 7.25 1,882.90

COGRI
BZ 37 @ BZ 30 h=2.95, H=2.43 23.86
BZ 30 @ BZ 31 h=2.43, H=2.60 21.63
BZ 28 @ BZ 37 h=1.40, H=2.95 68.03
BZ32@ BZ 31 h=1.20, H=2.60 10.88
BZ 128@ BZ 37 h=1.40, H=2.95 61.04

CHICHILIN

BZCHI 76 @ BZCHI 77 h=2.00, h=2.85 37.29


BZCHI 77 @ BZCHI 78 h=2.85, h=1.40 36.98

12.02.03.44 RELLENO Y COMPACTADO C/MAT PROPIO, A=0.60M, H=3.50M m 84.93 5.84 495.99

COGRI
BZ 55@ BZ 69 h=1.20, H=3.20 43.83
BZ 68A@ BZ 69 h=1.40, H=3.20 6.93
BZ 69@ BZ 8 h=3.20, H=1.40 34.17

12.02.04 TUBERIA DE DESAGUE


12.02.04.01 SUMINISTRO DE TUBERIA ISO 4435 S-25 DN 200MM U/FLEXIBLE m 2,829.96 26.85 75,984.43

COGRI
BZ 36@ BZ 127 h=1.40, H=1.40 63.10
BZ 127@ BZ 128 h=1.40, H=1.40 39.76
BZ 38@ BZ 39 h=1.50, H=1.50 68.54
BZ 39@ BZ 41 h=1.50, H=1.30 64.74
BZ 41@ BZ 36 h=1.30, H=1.30 50.62
BZ 36@ BZ 42 h=1.30, H=1.20 50.62
BZ42@ BZ 32 h=1.20, H=1.20 18.63
BZ 27 @ BZ 28 h=1.20, H=1.40 62.61
BZ 46 @ BZ 47 h=1.30, H=1.20 51.79
BZ 504@ BZ 49 h=1.30, H=1.40 14.35
BZ 49@ BZ 49A h=1.40, H=1.40 26.04
BZ 49A@ BZ 50 h=1.40, H=1.40 48.78
BZ 50@ BZ 51 h=1.40, H=1.40 47.37
BZ 61@ BZ 133 h=1.30, H=1.30 40.07
BZ 133@ BZ 62 h=1.30, H=1.30 39.19
BZ 62@ BZ 63 h=1.30, H=1.50 78.86
BZ 134@ BZ 65 h=1.60, H=1.40 77.83
BZ 35 @ BZ 36 h=1.60, H=1.40 68.28
BZ 37 @ BZ 30 h=2.95, H=2.43 23.86
BZ 30 @ BZ 31 h=2.43, H=2.60 21.63
BZ 28 @ BZ 37 h=1.40, H=2.95 68.03
BZ32@ BZ 31 h=1.20, H=2.60 10.88
BZ 128@ BZ 37 h=1.40, H=2.95 61.04
BZ 63@ BZ 66 h=1.50, H=1.30 60.08
BZ 65@ BZ 66A h=1.40, H=1.40 47.54
BZ 66A@ BZ 66 h=1.40, H=1.30 49.04
BZ 66@ BZ 55 h=1.30, H=1.20 18.92
BZ 55@ BZ 69 h=1.20, H=3.20 43.83
BZ 67@ BZ 68 h=1.60, H=1.80 58.00
BZ 68@ BZ 68A h=1.80, H=1.40 50.59
BZ 68A@ BZ 69 h=1.40, H=3.20 6.93
BZ 69@ BZ 8 h=3.20, H=1.40 34.17

ACHICARI - HUASALÓN
BZ_P1 @ BZ_P2 h=1.20, h=1.20 16.54
BZ_P2 @ BZ_P3 h=1.20, h=1.20 16.21
BZ_P3 @ BZ_P4 h=1.20, h=1.20 16.28
BZ_P4 @ BZ_P5 h=1.20, h=1.20 20.69
BZ_P5 @ BZ_P6 h=1.20, h=1.20 54.51
BZ_P6 @ BZ_P7 h=1.20, h=1.20 39.96
BZ_P7 @ BZ_P8 h=1.20, h=1.20 22.62
BZ_P8 @ BZ_P9 h=1.20, h=1.20 11.74
BZ_P9 @ BZ_P10 h=1.20, h=1.20 31.57
BZ_P10 @ BZ_P11 h=1.20, h=1.20 12.36
BZ_P11 @ BZ_P12 h=1.20, h=1.20 14.37
BZ_P12 @ BZ_P13 h=1.20, h=1.20 23.58
BZ_P13 @ BZ_P14 h=1.20, h=1.20 47.82
BZ_P14 @ BZ_P15 h=1.20, h=1.20 17.13
BZ_P15 @ BZ_P16 h=1.20, h=1.20 35.88
BZ_P16 @ BZ_P17 h=1.20, h=1.20 23.51
BZ_P17 @ BZ_P18 h=1.20, h=1.20 9.13
BZ_P18 @ BZ_P19 h=1.20, h=1.20 10.09
BZ_P19 @ BZ_P20 h=1.20, h=1.20 35.04
BZ_P20 @ BZ_P21 h=1.20, h=1.20 43.61
BZ_P21 @ BZ_P22 h=1.20, h=1.20 38.07
BZ_P22 @ BZ_P23 h=1.20, h=1.20 33.98
BZ_P23 @ BZ_P24 h=1.20, h=1.20 34.81

CHICHILIN
BZCHI 75 @ BZCHI 76 h=1.20, h=2.00 31.69
BZCHI 76 @ BZCHI 77 h=2.00, h=2.85 37.29
BZCHI 77 @ BZCHI 78 h=2.85, h=1.40 36.98
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 76.06
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 22.61
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.75

12.02.04.02 INSTALACION DE TUBERIA ISO 4435 S-25 DN=200MM m 2,829.96 4.28 12,112.23

COGRI
BZ 36@ BZ 127 h=1.40, H=1.40 63.10
BZ 127@ BZ 128 h=1.40, H=1.40 39.76
BZ 38@ BZ 39 h=1.50, H=1.50 68.54
BZ 39@ BZ 41 h=1.50, H=1.30 64.74
BZ 41@ BZ 36 h=1.30, H=1.30 50.62
BZ 36@ BZ 42 h=1.30, H=1.20 50.62
BZ42@ BZ 32 h=1.20, H=1.20 18.63
BZ 27 @ BZ 28 h=1.20, H=1.40 62.61
BZ 46 @ BZ 47 h=1.30, H=1.20 51.79
BZ 504@ BZ 49 h=1.30, H=1.40 14.35
BZ 49@ BZ 49A h=1.40, H=1.40 26.04
BZ 49A@ BZ 50 h=1.40, H=1.40 48.78
BZ 50@ BZ 51 h=1.40, H=1.40 47.37
BZ 61@ BZ 133 h=1.30, H=1.30 40.07
BZ 133@ BZ 62 h=1.30, H=1.30 39.19
BZ 62@ BZ 63 h=1.30, H=1.50 78.86
BZ 134@ BZ 65 h=1.60, H=1.40 77.83
BZ 35 @ BZ 36 h=1.60, H=1.40 68.28
BZ 37 @ BZ 30 h=2.95, H=2.43 23.86
BZ 30 @ BZ 31 h=2.43, H=2.60 21.63
BZ 28 @ BZ 37 h=1.40, H=2.95 68.03
BZ32@ BZ 31 h=1.20, H=2.60 10.88
BZ 128@ BZ 37 h=1.40, H=2.95 61.04
BZ 63@ BZ 66 h=1.50, H=1.30 60.08
BZ 65@ BZ 66A h=1.40, H=1.40 47.54
BZ 66A@ BZ 66 h=1.40, H=1.30 49.04
BZ 66@ BZ 55 h=1.30, H=1.20 18.92
BZ 55@ BZ 69 h=1.20, H=3.20 43.83
BZ 67@ BZ 68 h=1.60, H=1.80 58.00
BZ 68@ BZ 68A h=1.80, H=1.40 50.59
BZ 68A@ BZ 69 h=1.40, H=3.20 6.93
BZ 69@ BZ 8 h=3.20, H=1.40 34.17

ACHICARI - HUASALÓN
BZ_P1 @ BZ_P2 h=1.20, h=1.20 16.54
BZ_P2 @ BZ_P3 h=1.20, h=1.20 16.21
BZ_P3 @ BZ_P4 h=1.20, h=1.20 16.28
BZ_P4 @ BZ_P5 h=1.20, h=1.20 20.69
BZ_P5 @ BZ_P6 h=1.20, h=1.20 54.51
BZ_P6 @ BZ_P7 h=1.20, h=1.20 39.96
BZ_P7 @ BZ_P8 h=1.20, h=1.20 22.62
BZ_P8 @ BZ_P9 h=1.20, h=1.20 11.74
BZ_P9 @ BZ_P10 h=1.20, h=1.20 31.57
BZ_P10 @ BZ_P11 h=1.20, h=1.20 12.36
BZ_P11 @ BZ_P12 h=1.20, h=1.20 14.37
BZ_P12 @ BZ_P13 h=1.20, h=1.20 23.58
BZ_P13 @ BZ_P14 h=1.20, h=1.20 47.82
BZ_P14 @ BZ_P15 h=1.20, h=1.20 17.13
BZ_P15 @ BZ_P16 h=1.20, h=1.20 35.88
BZ_P16 @ BZ_P17 h=1.20, h=1.20 23.51
BZ_P17 @ BZ_P18 h=1.20, h=1.20 9.13
BZ_P18 @ BZ_P19 h=1.20, h=1.20 10.09
BZ_P19 @ BZ_P20 h=1.20, h=1.20 35.04
BZ_P20 @ BZ_P21 h=1.20, h=1.20 43.61
BZ_P21 @ BZ_P22 h=1.20, h=1.20 38.07
BZ_P22 @ BZ_P23 h=1.20, h=1.20 33.98
BZ_P23 @ BZ_P24 h=1.20, h=1.20 34.81

CHICHILIN
BZCHI 75 @ BZCHI 76 h=1.20, h=2.00 31.69
BZCHI 76 @ BZCHI 77 h=2.00, h=2.85 37.29
BZCHI 77 @ BZCHI 78 h=2.85, h=1.40 36.98
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 76.06
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 22.61
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.75

12.02.04.03 PRUEBA HIDRAULICA PARCIAL A ZANJA DESCUBIERTA DE TUBERIA PVC/ISO 4435 m 2,829.96 1.99 5,631.62

COGRI
BZ 36@ BZ 127 h=1.40, H=1.40 63.10
BZ 127@ BZ 128 h=1.40, H=1.40 39.76
BZ 38@ BZ 39 h=1.50, H=1.50 68.54
BZ 39@ BZ 41 h=1.50, H=1.30 64.74
BZ 41@ BZ 36 h=1.30, H=1.30 50.62
BZ 36@ BZ 42 h=1.30, H=1.20 50.62
BZ42@ BZ 32 h=1.20, H=1.20 18.63
BZ 27 @ BZ 28 h=1.20, H=1.40 62.61
BZ 46 @ BZ 47 h=1.30, H=1.20 51.79
BZ 504@ BZ 49 h=1.30, H=1.40 14.35
BZ 49@ BZ 49A h=1.40, H=1.40 26.04
BZ 49A@ BZ 50 h=1.40, H=1.40 48.78
BZ 50@ BZ 51 h=1.40, H=1.40 47.37
BZ 61@ BZ 133 h=1.30, H=1.30 40.07
BZ 133@ BZ 62 h=1.30, H=1.30 39.19
BZ 62@ BZ 63 h=1.30, H=1.50 78.86
BZ 134@ BZ 65 h=1.60, H=1.40 77.83
BZ 35 @ BZ 36 h=1.60, H=1.40 68.28
BZ 37 @ BZ 30 h=2.95, H=2.43 23.86
BZ 30 @ BZ 31 h=2.43, H=2.60 21.63
BZ 28 @ BZ 37 h=1.40, H=2.95 68.03
BZ32@ BZ 31 h=1.20, H=2.60 10.88
BZ 128@ BZ 37 h=1.40, H=2.95 61.04
BZ 63@ BZ 66 h=1.50, H=1.30 60.08
BZ 65@ BZ 66A h=1.40, H=1.40 47.54
BZ 66A@ BZ 66 h=1.40, H=1.30 49.04
BZ 66@ BZ 55 h=1.30, H=1.20 18.92
BZ 55@ BZ 69 h=1.20, H=3.20 43.83
BZ 67@ BZ 68 h=1.60, H=1.80 58.00
BZ 68@ BZ 68A h=1.80, H=1.40 50.59
BZ 68A@ BZ 69 h=1.40, H=3.20 6.93
BZ 69@ BZ 8 h=3.20, H=1.40 34.17

ACHICARI - HUASALÓN
BZ_P1 @ BZ_P2 h=1.20, h=1.20 16.54
BZ_P2 @ BZ_P3 h=1.20, h=1.20 16.21
BZ_P3 @ BZ_P4 h=1.20, h=1.20 16.28
BZ_P4 @ BZ_P5 h=1.20, h=1.20 20.69
BZ_P5 @ BZ_P6 h=1.20, h=1.20 54.51
BZ_P6 @ BZ_P7 h=1.20, h=1.20 39.96
BZ_P7 @ BZ_P8 h=1.20, h=1.20 22.62
BZ_P8 @ BZ_P9 h=1.20, h=1.20 11.74
BZ_P9 @ BZ_P10 h=1.20, h=1.20 31.57
BZ_P10 @ BZ_P11 h=1.20, h=1.20 12.36
BZ_P11 @ BZ_P12 h=1.20, h=1.20 14.37
BZ_P12 @ BZ_P13 h=1.20, h=1.20 23.58
BZ_P13 @ BZ_P14 h=1.20, h=1.20 47.82
BZ_P14 @ BZ_P15 h=1.20, h=1.20 17.13
BZ_P15 @ BZ_P16 h=1.20, h=1.20 35.88
BZ_P16 @ BZ_P17 h=1.20, h=1.20 23.51
BZ_P17 @ BZ_P18 h=1.20, h=1.20 9.13
BZ_P18 @ BZ_P19 h=1.20, h=1.20 10.09
BZ_P19 @ BZ_P20 h=1.20, h=1.20 35.04
BZ_P20 @ BZ_P21 h=1.20, h=1.20 43.61
BZ_P21 @ BZ_P22 h=1.20, h=1.20 38.07
BZ_P22 @ BZ_P23 h=1.20, h=1.20 33.98
BZ_P23 @ BZ_P24 h=1.20, h=1.20 34.81

CHICHILIN
BZCHI 75 @ BZCHI 76 h=1.20, h=2.00 31.69
BZCHI 76 @ BZCHI 77 h=2.00, h=2.85 37.29
BZCHI 77 @ BZCHI 78 h=2.85, h=1.40 36.98
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 76.06
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 22.61
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.75

12.02.04.04 PRUEBA HIDRAULICA FINAL A ZANJA TAPADA DE TUBERIA PVC/ISO 4435 DN=200M m 2,829.96 1.99 5,631.62

COGRI
BZ 36@ BZ 127 h=1.40, H=1.40 63.10
BZ 127@ BZ 128 h=1.40, H=1.40 39.76
BZ 38@ BZ 39 h=1.50, H=1.50 68.54
BZ 39@ BZ 41 h=1.50, H=1.30 64.74
BZ 41@ BZ 36 h=1.30, H=1.30 50.62
BZ 36@ BZ 42 h=1.30, H=1.20 50.62
BZ42@ BZ 32 h=1.20, H=1.20 18.63
BZ 27 @ BZ 28 h=1.20, H=1.40 62.61
BZ 46 @ BZ 47 h=1.30, H=1.20 51.79
BZ 504@ BZ 49 h=1.30, H=1.40 14.35
BZ 49@ BZ 49A h=1.40, H=1.40 26.04
BZ 49A@ BZ 50 h=1.40, H=1.40 48.78
BZ 50@ BZ 51 h=1.40, H=1.40 47.37
BZ 61@ BZ 133 h=1.30, H=1.30 40.07
BZ 133@ BZ 62 h=1.30, H=1.30 39.19
BZ 62@ BZ 63 h=1.30, H=1.50 78.86
BZ 134@ BZ 65 h=1.60, H=1.40 77.83
BZ 35 @ BZ 36 h=1.60, H=1.40 68.28
BZ 37 @ BZ 30 h=2.95, H=2.43 23.86
BZ 30 @ BZ 31 h=2.43, H=2.60 21.63
BZ 28 @ BZ 37 h=1.40, H=2.95 68.03
BZ32@ BZ 31 h=1.20, H=2.60 10.88
BZ 128@ BZ 37 h=1.40, H=2.95 61.04
BZ 63@ BZ 66 h=1.50, H=1.30 60.08
BZ 65@ BZ 66A h=1.40, H=1.40 47.54
BZ 66A@ BZ 66 h=1.40, H=1.30 49.04
BZ 66@ BZ 55 h=1.30, H=1.20 18.92
BZ 55@ BZ 69 h=1.20, H=3.20 43.83
BZ 67@ BZ 68 h=1.60, H=1.80 58.00
BZ 68@ BZ 68A h=1.80, H=1.40 50.59
BZ 68A@ BZ 69 h=1.40, H=3.20 6.93
BZ 69@ BZ 8 h=3.20, H=1.40 34.17

ACHICARI - HUASALÓN
BZ_P1 @ BZ_P2 h=1.20, h=1.20 16.54
BZ_P2 @ BZ_P3 h=1.20, h=1.20 16.21
BZ_P3 @ BZ_P4 h=1.20, h=1.20 16.28
BZ_P4 @ BZ_P5 h=1.20, h=1.20 20.69
BZ_P5 @ BZ_P6 h=1.20, h=1.20 54.51
BZ_P6 @ BZ_P7 h=1.20, h=1.20 39.96
BZ_P7 @ BZ_P8 h=1.20, h=1.20 22.62
BZ_P8 @ BZ_P9 h=1.20, h=1.20 11.74
BZ_P9 @ BZ_P10 h=1.20, h=1.20 31.57
BZ_P10 @ BZ_P11 h=1.20, h=1.20 12.36
BZ_P11 @ BZ_P12 h=1.20, h=1.20 14.37
BZ_P12 @ BZ_P13 h=1.20, h=1.20 23.58
BZ_P13 @ BZ_P14 h=1.20, h=1.20 47.82
BZ_P14 @ BZ_P15 h=1.20, h=1.20 17.13
BZ_P15 @ BZ_P16 h=1.20, h=1.20 35.88
BZ_P16 @ BZ_P17 h=1.20, h=1.20 23.51
BZ_P17 @ BZ_P18 h=1.20, h=1.20 9.13
BZ_P18 @ BZ_P19 h=1.20, h=1.20 10.09
BZ_P19 @ BZ_P20 h=1.20, h=1.20 35.04
BZ_P20 @ BZ_P21 h=1.20, h=1.20 43.61
BZ_P21 @ BZ_P22 h=1.20, h=1.20 38.07
BZ_P22 @ BZ_P23 h=1.20, h=1.20 33.98
BZ_P23 @ BZ_P24 h=1.20, h=1.20 34.81

CHICHILIN
BZCHI 75 @ BZCHI 76 h=1.20, h=2.00 31.69
BZCHI 76 @ BZCHI 77 h=2.00, h=2.85 37.29
BZCHI 77 @ BZCHI 78 h=2.85, h=1.40 36.98
BZCHI 78 @ BZCHI 79 h=1.40, h=1.40 74.85
BZCHI 79 @ BZCHI 80 h=1.40, h=1.40 74.30
BZCHI 80 @ BZCHI 81 h=1.40, h=1.40 24.69
BZCHI 81 @ BZCHI 82 h=1.40, h=1.40 20.24
BZCHI 82 @ BZCHI 83 h=1.40, h=1.40 76.06
BZCHI 83 @ BZCHI 84 h=1.40, h=1.40 22.61
BZCHI 84 @ BZCHI 85 h=1.40, h=1.40 47.48
BZCHI 85 @ BZCHI 86 h=1.40, h=1.40 22.91
BZCHI 86 @ BZCHI 87 h=1.40, h=1.40 60.93
BZCHI 87 @ BZCHI 88 h=1.40, h=1.40 43.00
BZCHI 88 @ BZCHI 89 h=1.40, h=1.40 44.51
BZCHI 89 @ BZCHI 90 h=1.40, h=1.40 15.79
BZCHI 90 @ BZCHI 91 h=1.40, h=1.40 26.07
BZCHI 91 @ BZCHI 92 h=1.40, h=1.40 16.23
BZCHI 92 @ BZCHI 93 h=1.40, h=1.40 45.36
BZCHI 93 @ BZ 974 h=1.40, h=1.40 33.75

12.02.05 EXCAVACION DE BUZONES


12.02.05.01 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=1.50M und 65.00 118.11 7,677.15

COGRI
BZ-40 h=1.4 1.00
BZ-45 h=1.2 1.00
BZ-44 h=1.4 1.00
BZ-46 h=1.3 1.00
BZ-47 h=1.2 1.00
BZ-48 h=1.2 1.00
BZ-125 h=1.2 1.00
BZ-49 h=1.4 1.00
BZ-49A h=1.4 1.00
BZ-50 h=1.4 1.00
BZ-51 h=1.40 1.00
BZ-61 h=1.30 1.00
BZ-133 h=1.30 1.00
BZ-62 h=1.30 1.00
BZ-63 h=1.50 1.00
BZ-65 h=1.40 1.00
BZ-66A h=1.40 1.00
BZ-66 h=1.30 1.00
BZ-68A h=1.40 1.00
BZ-55 h=1.2 1.00
BZ-62 h=1.30 1.00
BZ-55 h=1.20 1.00
BZ-68A h=1.40 1.00
BZ-8 h=1.40 1.00

ACHICARI - HUASALÓN
BZ_P1 h=1.20 1.00
BZ_P2 h=1.20 1.00
BZ_P3 h=1.20 1.00
BZ_P4 h=1.20 1.00
BZ_P5 h=1.20 1.00
BZ_P6 h=1.20 1.00
BZ_P7 h=1.20 1.00
BZ_P8 h=1.20 1.00
BZ_P9 h=1.20 1.00
BZ_P10 h=1.20 1.00
BZ_P11 h=1.20 1.00
BZ_P12 h=1.20 1.00
BZ_P13 h=1.20 1.00
BZ_P14 h=1.20 1.00
BZ_P15 h=1.20 1.00
BZ_P16 h=1.20 1.00
BZ_P17 h=1.20 1.00
BZ_P18 h=1.20 1.00
BZ_P19 h=1.20 1.00
BZ_P20 h=1.20 1.00
BZ_P21 h=1.20 1.00
BZ_P22 h=1.20 1.00
BZ_P23 h=1.20 1.00
BZ_P24 h=1.20 1.00

CHICHILIN
BZCHI 78 h=1.40 1.00
BZCHI 79 h=1.40 1.00
BZCHI 80 h=1.40 1.00
BZCHI 81 h=1.40 1.00
BZCHI 82 h=1.40 1.00
BZCHI 83 h=1.40 1.00
BZCHI 84 h=1.40 1.00
BZCHI 85 h=1.40 1.00
BZCHI 86 h=1.40 1.00
BZCHI 87 h=1.40 1.00
BZCHI 88 h=1.40 1.00
BZCHI 89 h=1.40 1.00
BZCHI 90 h=1.40 1.00
BZCHI 91 h=1.40 1.00
BZCHI 92 h=1.40 1.00
BZCHI 93 h=1.40 1.00
BZ 974 h=1.40 1.00

12.02.05.02 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=2.00M und 4.00 128.83 515.32

COGRI
BZ-134 h=1.60 1.00
BZ-67 h=1.60 1.00
BZ-68 h=1.80 1.00

CHICHILIN
BZCHI 76 h=2.00 1.00

12.02.05.03 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=2.50M und 1.00 141.74 141.74

COGRI
BZ - 30 H 2.43 1.00

12.02.05.04 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=3.00M und 3.00 157.48 472.44

COGRI
BZ-31 h=2.60 1.00
BZ-37 h=2.95 1.00

CHICHILIN
BZCHI 77 h=2.85 1.00

12.02.05.05 EXCAVACION BUZON, Dexc.=1.60M, HASTA H=3.50M und 1.00 177.17 177.17

COGRI
BZ-69 h=3.20 1.00

12.02.06 CONSTRUCCION DE BUZONES


12.02.06.01 CONSTRUCCION DE BUZONES DN=1.20M, H=1.2 @1.50m Und 65.00 1,453.31 94,465.15

COGRI
BZ-40 h=1.4 1.00
BZ-45 h=1.2 1.00
BZ-44 h=1.4 1.00
BZ-46 h=1.3 1.00
BZ-47 h=1.2 1.00
BZ-48 h=1.2 1.00
BZ-125 h=1.2 1.00
BZ-49 h=1.4 1.00
BZ-49A h=1.4 1.00
BZ-50 h=1.4 1.00
BZ-51 h=1.40 1.00
BZ-61 h=1.30 1.00
BZ-133 h=1.30 1.00
BZ-62 h=1.30 1.00
BZ-63 h=1.50 1.00
BZ-65 h=1.40 1.00
BZ-66A h=1.40 1.00
BZ-66 h=1.30 1.00
BZ-68A h=1.40 1.00
BZ-55 h=1.2 1.00
BZ-62 h=1.30 1.00
BZ-55 h=1.20 1.00
BZ-68A h=1.40 1.00
BZ-8 h=1.40 1.00

ACHICARI - HUASALÓN
BZ_P1 h=1.20 1.00
BZ_P2 h=1.20 1.00
BZ_P3 h=1.20 1.00
BZ_P4 h=1.20 1.00
BZ_P5 h=1.20 1.00
BZ_P6 h=1.20 1.00
BZ_P7 h=1.20 1.00
BZ_P8 h=1.20 1.00
BZ_P9 h=1.20 1.00
BZ_P10 h=1.20 1.00
BZ_P11 h=1.20 1.00
BZ_P12 h=1.20 1.00
BZ_P13 h=1.20 1.00
BZ_P14 h=1.20 1.00
BZ_P15 h=1.20 1.00
BZ_P16 h=1.20 1.00
BZ_P17 h=1.20 1.00
BZ_P18 h=1.20 1.00
BZ_P19 h=1.20 1.00
BZ_P20 h=1.20 1.00
BZ_P21 h=1.20 1.00
BZ_P22 h=1.20 1.00
BZ_P23 h=1.20 1.00
BZ_P24 h=1.20 1.00

CHICHILIN
BZCHI 78 h=1.40 1.00
BZCHI 79 h=1.40 1.00
BZCHI 80 h=1.40 1.00
BZCHI 81 h=1.40 1.00
BZCHI 82 h=1.40 1.00
BZCHI 83 h=1.40 1.00
BZCHI 84 h=1.40 1.00
BZCHI 85 h=1.40 1.00
BZCHI 86 h=1.40 1.00
BZCHI 87 h=1.40 1.00
BZCHI 88 h=1.40 1.00
BZCHI 89 h=1.40 1.00
BZCHI 90 h=1.40 1.00
BZCHI 91 h=1.40 1.00
BZCHI 92 h=1.40 1.00
BZCHI 93 h=1.40 1.00
BZ 974 h=1.40 1.00
12.02.06.02 CONSTRUCCION DE BUZONES DN=1.20M, H=1.51 @2.00m Und 4.00 1,669.55 6,678.20

COGRI
BZ-134 h=1.60 1.00
BZ-67 h=1.60 1.00
BZ-68 h=1.80 1.00

CHICHILIN
BZCHI 76 h=2.00 1.00

12.02.06.03 CONSTRUCCION DE BUZONES DN=1.20M, H=2.01 @2.50m Und 1.00 1,646.94 1,646.94

COGRI
BZ - 30 H 2.43 1.00

12.02.06.04 CONSTRUCCION DE BUZONES DN=1.20M, H=2.51 @3.00m Und 3.00 1,951.04 5,853.12

COGRI
BZ-31 h=2.60 1.00
BZ-37 h=2.95 1.00

CHICHILIN
BZCHI 77 h=2.85 1.00

12.02.06.05 CONSTRUCCION DE BUZONES DN=1.20M, H=3.01 @3.50m Und 1.00 3,296.84 3,296.84

COGRI
BZ-69 h=3.20 1.00

12.03 CONEXIONES DOMICILIARIAS - DESAGUE


EXCAVACION ZANJA MANUAL T.NORMAL A=0.50 H=variable, CONEX, DOMIC.
12.03.01 m 6.00 13.08 12,870.72
P/DESAGUE
REFINE Y NIVELACION DE ZANJA T.NORMAL, INC CAMA DE APOYO, CONEX. DOMIC.
12.03.02 m 6.00 4.00 3,936.00
P/DESAGUE

12.03.03 RELLENO COMPACTADO CON MAT PROPIO, P/DESAGUE m 6.00 10.15 9,987.60
12.03.04 SUMINISTRO DE TUBERIA ISO 4435 S-20 DN160MM U/F m 6.00 19.40 19,089.60
12.03.05 CONEXION DOMICILIARIA INC/TODOS LOS ACCESORIOS und 164.00 365.95 60,015.80
PPTO - COGRI (SISTEMA DE ALCANTARILLADO) S/. 262,795.89

PPTO - ESCOBAYA - SAN FRANCISCO (SISTEMA DE ALCANTARILLADO) S/. 140,773.74

PPTO - ACHICARI - HUASALON (SISTEMA DE ALCANTARILLADO) S/. 79,324.65

PPTO - CHICHILIN (SISTEMA DE ALCANTARILLADO) S/. 83,084.50

PPTO - CHICHILIN (SISTEMA DE AGUA) S/. 127,060.39

PPTO TOTAL S/. 693,039.17


PLANIFICACION OCTUBRE 2021
PROYECTO : "MEJORAMIENTO DE LOS SISTEMAS DE AGUA PARA CONSUMO HUMANO Y ALCANTARILLADO EN OMATE Y ANEXOS, DISTRITO DE OMATE, PROVINCIA GENERAL SANCHEZ CERRO - MOQUEGUA"
CUADRILLA : 02 OPERARIOS + 07 PEONES+02 OFICIALES
MONTO : S/. 262,795.89
SEMANA N°01 SEMANA N°02 SEMANA N°03 SEMANA N°04 SEMANA N°05
ITEM ACTIVIDADES UNIDAD
10/1/2021 10/2/2021 10/4/2021 10/5/2021 10/6/2021 10/7/2021 10/11/2021 10/12/2021 10/13/2021 10/14/2021 10/15/2021 10/16/2021 10/18/2021 10/19/2021 10/20/2021 10/21/2021 10/22/2021 10/23/2021 10/25/2021 10/26/2021 10/27/2021 10/28/2021 10/29/2021 10/30/2021

II.00 COGRI( SISTEMA DE ALCANTARILLADO)

2 3 3 3 3 3 4
1 EXCAVACION PARA BUZON UND
BZ 44, BZ 46 BZ 47, BZ 61, BZ 133 BZ 62, BZ 63, BZ 66 BZ 134, BZ 65, BZ 66A BZ 55, BZ 69, BZ 67 BZ 68, BZ 68A, BZ 8 BZ 49,BZ 49A, BZ 50, BZ 51

2 3 3 3 3 3 4
PERFILADO DE EXCAVACION PARA
2 UND
BUZON
BZ 44, BZ 46 BZ 47, BZ 61, BZ 133 BZ 62, BZ 63, BZ 66 BZ 134, BZ 65, BZ 66A BZ 55, BZ 69, BZ 67 BZ 68, BZ 68A, BZ 8 BZ 49,BZ 49A, BZ 50, BZ 51

2 3 3 3 3 3 4
3 VACIADO DE PISO PARA BUZON UND
BZ 44, BZ 46 BZ 47, BZ 61, BZ 133 BZ 62, BZ 63, BZ 66 BZ 134, BZ 65, BZ 66A BZ 55, BZ 69, BZ 67 BZ 68, BZ 68A, BZ 8 BZ 49,BZ 49A, BZ 50, BZ 51

1 1 2 1 2 3 3 3 3 3 4
4 ENCOFRADO DE CUERPO PARA BUZON UND
Bz 37 Bz 32 Bz 42, Bz 38 Bz 30 BZ 44, BZ 46 BZ 47, BZ 61, BZ 133 BZ 62, BZ 63, BZ 66 BZ 134, BZ 65, BZ 66A BZ 55, BZ 69, BZ 67 BZ 68, BZ 68A, BZ 8 BZ 49,BZ 49A, BZ 50, BZ 51

1 1 2 1 2 3 3 3 3 3 4
5 VACIADO DE CUERPO PARA BUZON UND
Bz 37 Bz 32 Bz 42, Bz 38 Bz 30 BZ 44, BZ 46 BZ 47, BZ 61, BZ 133 BZ 62, BZ 63, BZ 66 BZ 134, BZ 65, BZ 66A BZ 55, BZ 69, BZ 67 BZ 68, BZ 68A, BZ 8 BZ 49,BZ 49A, BZ 50, BZ 51

1 1 2 1 2 3 3 3 3 3 4
DESENCOFRADO DE CUERPO PARA
6 UND
BUZON Bz 37 Bz 32 Bz 42, Bz 38 Bz 30 BZ 44, BZ 46 BZ 47, BZ 61, BZ 133 BZ 62, BZ 63, BZ 66 BZ 134, BZ 65, BZ 66A BZ 55, BZ 69, BZ 67 BZ 68, BZ 68A, BZ 8 BZ 49,BZ 49A, BZ 50, BZ 51

1 1 2 1 2 3 3 3 3 3 4
7 SOLAQUEO DE CUERPO DE BUZON UND
Bz 37 Bz 32 Bz 42, Bz 38 Bz 30 BZ 44, BZ 46 BZ 47, BZ 61, BZ 133 BZ 62, BZ 63, BZ 66 BZ 134, BZ 65, BZ 66A BZ 55, BZ 69, BZ 67 BZ 68, BZ 68A, BZ 8 BZ 49,BZ 49A, BZ 50, BZ 51

103.75 129.58 115.36 130.64 93.11 105.92 127.06 118.05 137.91 115.5 101.83 106.04 122.19
EXCAVACIÓN DE ZANJA PARA TUBERIA
8 ML
200 MM BZ 36@BZ 42, BZ 37@BZ 30, BZ BZ 35@BZ 39, BZ 46@BZ 47, BZ
Bz 34@ Bz 28, Bz 127@ Bz 128 Bz 128@BZ 37, Bz 38@Bz 39 Bz 39@BZ 36 BZ 27@BZ 37 BZ 41@ BZ 127, BZ 127@BZ 34 BZ 133@BZ 63 BZ 63@ BZ 66, BZ 134@BZ65 BZ 66A@BZ 66, BZ 66@BZ 69 BZ 55@BZ 69, BZ 67@BZ 68 BZ 68@BZ 8, BZ 504@BZ 49 BZ49 @ BZ 51
42@ BZ 32 61@BZ 133

103.75 129.58 115.36 130.64 93.11 105.92 127.06 118.05 137.91 115.5 101.83 106.04 122.19
REFINE Y NIVELACIÓN DE ZANJA T.
9 ML
NORMAL, P/ DESAGÜE BZ 36@BZ 42, BZ 37@BZ 30, BZ BZ 35@BZ 39, BZ 46@BZ 47, BZ
Bz 34@ Bz 28, Bz 127@ Bz 128 Bz 128@BZ 37, Bz 38@Bz 39 Bz 39@BZ 36 BZ 27@BZ 37 BZ 41@ BZ 127, BZ 127@BZ 34 BZ 133@BZ 63 BZ 63@ BZ 66, BZ 134@BZ65 BZ 66A@BZ 66, BZ 66@BZ 69 BZ 55@BZ 69, BZ 67@BZ 68 BZ 68@BZ 8, BZ 504@BZ 49 BZ49 @ BZ 51
42@ BZ 32 61@BZ 133

103.75 129.58 115.36 130.64 93.11 105.92 127.06 118.05 137.91 115.5 101.83 106.04 122.19
CAMA DE ARENA EN ZANJA H=0.10 A
10 ML
H=0.60 BZ 36@BZ 42, BZ 37@BZ 30, BZ BZ 35@BZ 39, BZ 46@BZ 47, BZ
Bz 34@ Bz 28, Bz 127@ Bz 128 Bz 128@BZ 37, Bz 38@Bz 39 Bz 39@BZ 36 BZ 27@BZ 37 BZ 41@ BZ 127, BZ 127@BZ 34 BZ 133@BZ 63 BZ 63@ BZ 66, BZ 134@BZ65 BZ 66A@BZ 66, BZ 66@BZ 69 BZ 55@BZ 69, BZ 67@BZ 68 BZ 68@BZ 8, BZ 504@BZ 49 BZ49 @ BZ 51
42@ BZ 32 61@BZ 133

103.75 129.58 115.36 130.64 93.11 105.92 127.06 118.05 137.91 115.5 101.83 106.04 122.19

11 SUMINISTRO DE TUBERÍA DN 200MM ML


BZ 36@BZ 42, BZ 37@BZ 30, BZ BZ 35@BZ 39, BZ 46@BZ 47, BZ
Bz 34@ Bz 28, Bz 127@ Bz 128 Bz 128@BZ 37, Bz 38@Bz 39 Bz 39@BZ 36 BZ 27@BZ 37 BZ 41@ BZ 127, BZ 127@BZ 34 BZ 133@BZ 63 BZ 63@ BZ 66, BZ 134@BZ65 BZ 66A@BZ 66, BZ 66@BZ 69 BZ 55@BZ 69, BZ 67@BZ 68 BZ 68@BZ 8, BZ 504@BZ 49 BZ49 @ BZ 51
42@ BZ 32 61@BZ 133

103.75 129.58 115.36 130.64 93.11 105.92 127.06 118.05 137.91 115.5 101.83 106.04 122.19

12 INSTALACIÓN DE TUBERÍA DN 200 MM ML


BZ 36@BZ 42, BZ 37@BZ 30, BZ BZ 35@BZ 39, BZ 46@BZ 47, BZ
Bz 34@ Bz 28, Bz 127@ Bz 128 Bz 128@BZ 37, Bz 38@Bz 39 Bz 39@BZ 36 BZ 27@BZ 37 BZ 41@ BZ 127, BZ 127@BZ 34 BZ 133@BZ 63 BZ 63@ BZ 66, BZ 134@BZ65 BZ 66A@BZ 66, BZ 66@BZ 69 BZ 55@BZ 69, BZ 67@BZ 68 BZ 68@BZ 8, BZ 504@BZ 49 BZ49 @ BZ 51
42@ BZ 32 61@BZ 133

3 3 3 3 2 3 3 3 3 3 3 3 3
14 EMBOQUILLADO UND
Bz 35A, Bz 33, Bz 33A Bz 36, Bz 127, Bz 34 BZ 129, BZ 28, BZ 27 BZ 24, Bz 25, Bz 37 BZ 36, BZ 128 BZ 39, BZ 38, BZ 35 BZ 30, BZ32, BZ 42 BZ 41, BZ 44, Bz 46 Bz 61, Bz 133, Bz 62 Bz 63, Bz 66, 134 Bz 65, Bz 65A, Bz 67 Bz 68, Bz 68A, Bz 69 Bz 49, Bz 61, Bz 50, Bz 51

3 3 3 3 2 3 3 3 3 3 3 3 3
13 VACIADO DE 1/2 CAÑA UND
Bz 35A, Bz 33, Bz 33A Bz 36, Bz 127, Bz 34 BZ 129, BZ 28, BZ 27 BZ 24, Bz 25, Bz 37 BZ 36, BZ 128 BZ 39, BZ 38, BZ 35 BZ 30, BZ32, BZ 42 BZ 41, BZ 44, Bz 46 Bz 61, Bz 133, Bz 62 Bz 63, Bz 66, 134 Bz 65, Bz 65A, Bz 67 Bz 68, Bz 68A, Bz 69 Bz 49, Bz 61, Bz 50, Bz 51

10 16 11 14 7 1 5 16 18 11 12 16 10 7 10
EXCAVACION DE ZANJA PARA
15 UND
CONEXIONES DOMICILIARIAS H10, G8, H9, G9, G7, G8, G9, G 10,G11, G12,G1, E8, E7, E6, E5, C5, C6, C7, C8, B5, B6, B7, B8, B9, B10, B11, B12, C11, A15,A14,A13,A12,B1,B2,B3,B4,
A19, A18, A17, A15, B20, B19, B18 E4 B17,B16,B15,B14,B13 A1,A2,A3
G2,G3,G4,G5,G6,E2,E3 H10,H9,H8,H7,H6,H5,H4,H3,H2 C13, C12 C10, C9, A23, A22, A21, A20 H14,H13,H12,11,C1,C2,C3,C4

10 16 11 14 7 1 5 16 18 11 12 16 10 7 10
REFINE DE ZANJA PARA CONEXIONES
16 UND
DOMICILIARIAS H10, G8, H9, G9, G7, G8, G9, G 10,G11, G12,G1, E8, E7, E6, E5, C5, C6, C7, C8, B5, B6, B7, B8, B9, B10, B11, B12, C11, A15,A14,A13,A12,B1,B2,B3,B4,
A19, A18, A17, A15, B20, B19, B18 E4 B17,B16,B15,B14,B13 A1,A2,A3 0 0 0 0 0 0
G2,G3,G4,G5,G6,E2,E3 H10,H9,H8,H7,H6,H5,H4,H3,H2 C13, C12 C10, C9, A23, A22, A21, A20 H14,H13,H12,11,C1,C2,C3,C4

10 16 11 14 7 1 5 16 18 11 12 16 10 7 10

CAMA DE ARENA PARA CONEXIONES


17 UND
DOMICILIARIAS H10, G8, H9, G9, G7, G8, G9, G 10,G11, G12,G1, E8, E7, E6, E5, C5, C6, C7, C8, B5, B6, B7, B8, B9, B10, B11, B12, C11, A15,A14,A13,A12,B1,B2,B3,B4,
A19, A18, A17, A15, B20, B19, B18 E4 B17,B16,B15,B14,B13 A1,A2,A3 0 0 0 0 0 0
G2,G3,G4,G5,G6,E2,E3 H10,H9,H8,H7,H6,H5,H4,H3,H2 C13, C12 C10, C9, A23, A22, A21, A20 H14,H13,H12,11,C1,C2,C3,C4

10 16 11 14 7 1 5 16 18 11 12 16 10 7 10
SUMINISTRO DE TUBERIA PARA
18 UND
CONEXIONES DOMICILIARIAS H10, G8, H9, G9, G7, G8, G9, G 10,G11, G12,G1, E8, E7, E6, E5, C5, C6, C7, C8, B5, B6, B7, B8, B9, B10, B11, B12, C11, A15,A14,A13,A12,B1,B2,B3,B4,
A19, A18, A17, A15, B20, B19, B18 E4 B17,B16,B15,B14,B13 A1,A2,A3 0 0 0 0 0 0
G2,G3,G4,G5,G6,E2,E3 H10,H9,H8,H7,H6,H5,H4,H3,H2 C13, C12 C10, C9, A23, A22, A21, A20 H14,H13,H12,11,C1,C2,C3,C4

10 16 11 14 7 1 5 16 18 11 12 16 10 7 10

INSTALACION DE TUBERIA PARA


19 UND
CONEXIONES DOMICILIARIAS H10, G8, H9, G9, G7, G8, G9, G 10,G11, G12,G1, E8, E7, E6, E5, C5, C6, C7, C8, B5, B6, B7, B8, B9, B10, B11, B12, C11, A15,A14,A13,A12,B1,B2,B3,B4,
A19, A18, A17, A15, B20, B19, B18 E4 B17,B16,B15,B14,B13 A1,A2,A3 0 0 0 0 0 0
G2,G3,G4,G5,G6,E2,E3 H10,H9,H8,H7,H6,H5,H4,H3,H2 C13, C12 C10, C9, A23, A22, A21, A20 H14,H13,H12,11,C1,C2,C3,C4

142.03 103.75 129.58 115.36 130.64 93.11 105.92 127.06 118.05 137.91 115.5 101.83 106.04 122.19

20 PRUEBA HIDRÁULICA A ZANJA ABIERTA ML


BZ 36@BZ 42, BZ 37@BZ 30, BZ BZ 35@BZ 39, BZ 46@BZ 47, BZ
Bz 35A@ Bz 34 Bz 34@ Bz 28, Bz 127@ Bz 128 Bz 128@BZ 37, Bz 38@Bz 39 Bz 39@BZ 36 BZ 27@BZ 37 BZ 41@ BZ 127, BZ 127@BZ 34 BZ 133@BZ 63 BZ 63@ BZ 66, BZ 134@BZ65 BZ 66A@BZ 66, BZ 66@BZ 69 BZ 55@BZ 69, BZ 67@BZ 68 BZ 68@BZ 8, BZ 504@BZ 49 BZ49 @ BZ 51
42@ BZ 32 61@BZ 133

142.03 103.75 129.58 115.36 130.64 93.11 105.92 127.06 118.05 137.91 115.5 101.83 106.04 122.19
RELLENO PROTECTOR C/MAT. PROPIO
21 ML
P/TUB 200MM BZ 36@BZ 42, BZ 37@BZ 30, BZ BZ 35@BZ 39, BZ 46@BZ 47, BZ
Bz 35A@ Bz 34 Bz 34@ Bz 28, Bz 127@ Bz 128 Bz 128@BZ 37, Bz 38@Bz 39 Bz 39@BZ 36 BZ 27@BZ 37 BZ 41@ BZ 127, BZ 127@BZ 34 BZ 133@BZ 63 BZ 63@ BZ 66, BZ 134@BZ65 BZ 66A@BZ 66, BZ 66@BZ 69 BZ 55@BZ 69, BZ 67@BZ 68 BZ 68@BZ 8, BZ 504@BZ 49 BZ49 @ BZ 51
42@ BZ 32 61@BZ 133

11 14 7 1 5 16 18 11 12 16 10 7 10

RELLENO PROTECTOR PARA


22 UND
CONEXIONES DOMICILIARIAS E8, E7, E6, E5, C5, C6, C7, C8, B5, B6, B7, B8, B9, B10, B11, B12, C11, A15,A14,A13,A12,B1,B2,B3,B4,
A19, A18, A17, A15, B20, B19, B18 E4 B17,B16,B15,B14,B13 A1,A2,A3
C13, C12 C10, C9, A23, A22, A21, A20 H14,H13,H12,11,C1,C2,C3,C4

142.03 103.75 129.58 115.36 130.64 93.11 105.92 127.06 118.05 137.91 115.5 101.83 106.04 122.19

RELLENO Y COMPACTADO C/MAT


24 ML
PROPIO BZ 36@BZ 42, BZ 37@BZ 30, BZ BZ 35@BZ 39, BZ 46@BZ 47, BZ
Bz 35A@ Bz 34 Bz 34@ Bz 28, Bz 127@ Bz 128 Bz 128@BZ 37, Bz 38@Bz 39 Bz 39@BZ 36 BZ 27@BZ 37 BZ 41@ BZ 127, BZ 127@BZ 34 BZ 133@BZ 63 BZ 63@ BZ 66, BZ 134@BZ65 BZ 66A@BZ 66, BZ 66@BZ 69 BZ 55@BZ 69, BZ 67@BZ 68 BZ 68@BZ 8, BZ 504@BZ 49 BZ49 @ BZ 51
42@ BZ 32 61@BZ 133

10 16 11 14 7 1 5 16 18 11 12 16 10 7 10

RELLENO Y COMPACTADO C/MAT


25 UND
PROPIO CONEXIONES DOMICILIARIAS H10, G8, H9, G9, G7, G8, G9, G 10,G11, G12,G1, E8, E7, E6, E5, C5, C6, C7, C8, B5, B6, B7, B8, B9, B10, B11, B12, C11, A15,A14,A13,A12,B1,B2,B3,B4,
A19, A18, A17, A15, B20, B19, B18 E4 B17,B16,B15,B14,B13 A1,A2,A3 0 0 0 0 0 0
G2,G3,G4,G5,G6,E2,E3 H10,H9,H8,H7,H6,H5,H4,H3,H2 C13, C12 C10, C9, A23, A22, A21, A20 H14,H13,H12,11,C1,C2,C3,C4

3 3 3 3 2 3 3 3 3 3 3 3 3
26 ENCOFRADO DE TAPA DE BUZON UND
Bz 35A, Bz 33, Bz 33A Bz 36, Bz 127, Bz 34 BZ 129, BZ 28, BZ 27 BZ 24, Bz 25, Bz 37 BZ 36, BZ 128 BZ 39, BZ 38, BZ 35 BZ 30, BZ32, BZ 42 BZ 41, BZ 44, Bz 46 Bz 61, Bz 133, Bz 62 Bz 63, Bz 66, 134 Bz 65, Bz 65A, Bz 67 Bz 68, Bz 68A, Bz 69 Bz 49, Bz 61, Bz 50, Bz 51

3 3 3 3 2 3 3 3 3 3 3 3 3
27 VACIADO DE TAPA DE BUZON UND
Bz 35A, Bz 33, Bz 33A Bz 36, Bz 127, Bz 34 BZ 129, BZ 28, BZ 27 BZ 24, Bz 25, Bz 37 BZ 36, BZ 128 BZ 39, BZ 38, BZ 35 BZ 30, BZ32, BZ 42 BZ 41, BZ 44, Bz 46 Bz 61, Bz 133, Bz 62 Bz 63, Bz 66, 134 Bz 65, Bz 65A, Bz 67 Bz 68, Bz 68A, Bz 69 Bz 49, Bz 61, Bz 50, Bz 51

3 3 3 3 2 3 3 3 3 3 3 3 3
28 DESENCOFRADO DE TAPA DE BUZON UND
Bz 35A, Bz 33, Bz 33A Bz 36, Bz 127, Bz 34 BZ 129, BZ 28, BZ 27 BZ 24, Bz 25, Bz 37 BZ 36, BZ 128 BZ 39, BZ 38, BZ 35 BZ 30, BZ32, BZ 42 BZ 41, BZ 44, Bz 46 Bz 61, Bz 133, Bz 62 Bz 63, Bz 66, 134 Bz 65, Bz 65A, Bz 67 Bz 68, Bz 68A, Bz 69 Bz 49, Bz 61, Bz 50, Bz 51

10 16 11 14 7 1 5 16 18 11 12 16 10 7 10

29 EXCAVACION PARA CAJA DE DESAGUE UND


H10, G8, H9, G9, G7, G8, G9, G 10,G11, G12,G1, E8, E7, E6, E5, C5, C6, C7, C8, B5, B6, B7, B8, B9, B10, B11, B12, C11, A15,A14,A13,A12,B1,B2,B3,B4,
A19, A18, A17, A15, B20, B19, B18 E4 B17,B16,B15,B14,B13 A1,A2,A3 0 0 0 0 0 0
G2,G3,G4,G5,G6,E2,E3 H10,H9,H8,H7,H6,H5,H4,H3,H2 C13, C12 C10, C9, A23, A22, A21, A20 H14,H13,H12,11,C1,C2,C3,C4

10 16 11 14 7 1 5 16 18 11 12 16 10 7 10

30 INSTALACION DE CAJA DE DESAGUE UND


H10, G8, H9, G9, G7, G8, G9, G 10,G11, G12,G1, E8, E7, E6, E5, C5, C6, C7, C8, B5, B6, B7, B8, B9, B10, B11, B12, C11, A15,A14,A13,A12,B1,B2,B3,B4,
A19, A18, A17, A15, B20, B19, B18 E4 B17,B16,B15,B14,B13 A1,A2,A3 0 0 0 0 0 0
G2,G3,G4,G5,G6,E2,E3 H10,H9,H8,H7,H6,H5,H4,H3,H2 C13, C12 C10, C9, A23, A22, A21, A20 H14,H13,H12,11,C1,C2,C3,C4

10 16 11 14 7 1 5 16 18 11 12 16 10 7 10

31 ENCOFRADO PARA CAJA DE DESAGUE UND


H10, G8, H9, G9, G7, G8, G9, G 10,G11, G12,G1, E8, E7, E6, E5, C5, C6, C7, C8, B5, B6, B7, B8, B9, B10, B11, B12, C11, A15,A14,A13,A12,B1,B2,B3,B4,
A19, A18, A17, A15, B20, B19, B18 E4 B17,B16,B15,B14,B13 A1,A2,A3 0 0 0 0 0 0
G2,G3,G4,G5,G6,E2,E3 H10,H9,H8,H7,H6,H5,H4,H3,H2 C13, C12 C10, C9, A23, A22, A21, A20 H14,H13,H12,11,C1,C2,C3,C4

10 16 11 14 7 1 5 16 18 11 12 16 10 7 10

VACIADO DE LOSA DE CONCRETO PARA


32 UND
CAJA DE DESAGUE H10, G8, H9, G9, G7, G8, G9, G 10,G11, G12,G1, E8, E7, E6, E5, C5, C6, C7, C8, B5, B6, B7, B8, B9, B10, B11, B12, C11, A15,A14,A13,A12,B1,B2,B3,B4,
A19, A18, A17, A15, B20, B19, B18 E4 B17,B16,B15,B14,B13 A1,A2,A3 0 0 0 0 0 0
G2,G3,G4,G5,G6,E2,E3 H10,H9,H8,H7,H6,H5,H4,H3,H2 C13, C12 C10, C9, A23, A22, A21, A20 H14,H13,H12,11,C1,C2,C3,C4

10 16 11 14 7 1 5 16 18 11 12 16 10 7 10

DESENCOFRADO DE LOSA DE
33 UND
CONCRETO PARA CAJA DE DESAGUE H10, G8, H9, G9, G7, G8, G9, G 10,G11, G12,G1, E8, E7, E6, E5, C5, C6, C7, C8, B5, B6, B7, B8, B9, B10, B11, B12, C11, A15,A14,A13,A12,B1,B2,B3,B4,
A19, A18, A17, A15, B20, B19, B18 E4 B17,B16,B15,B14,B13 A1,A2,A3 0 0 0 0 0 0
G2,G3,G4,G5,G6,E2,E3 H10,H9,H8,H7,H6,H5,H4,H3,H2 C13, C12 C10, C9, A23, A22, A21, A20 H14,H13,H12,11,C1,C2,C3,C4
PLANIFICACION SETIEMBRE 2021
PROYECTO : "MEJORAMIENTO DE LOS SISTEMAS DE AGUA PARA CONSUMO HUMANO Y ALCANTARILLADO EN OMATE Y ANEXOS, DISTRITO DE OMATE, PROVINCIA GENERAL SANCHEZ CERRO - MOQUEGUA"
CUADRILLA : 05 OPERARIOS Y 09 PEONES
MONTO : S/. 162,401.74

SEMANA N°01 SEMANA N°02 SEMANA N°03 SEMANA N°04 SEMANA N°05
ITEM ACTIVIDADES UNIDAD
9/1/2021 9/2/2021 9/3/2021 9/4/2021 9/6/2021 9/7/2021 9/8/2021 9/9/2021 9/10/2021 9/11/2021 9/13/2021 9/14/2021 9/15/2021 9/16/2021 9/17/2021 9/18/2021 9/20/2021 9/21/2021 9/22/2021 9/23/2021 9/24/2021 9/25/2021 9/27/2021 9/28/2021 9/29/2021 9/30/2021

II.00 ANEXO DE CHICHILÍN- COLECTOR SECUNDADIO

1 EXCAVACION PARA BUZON UND 8 8 8 8

2 PERFILADO DE EXCAVACION PARA BUZON UND 8 8 8 8

3 VACIADO DE PISO PARA BUZON UND 4 4 4 4 4 4 4 4

4 ENCOFRADO DE CUERPO PARA BUZON UND 4 4 4 4 4 4 4 4

5 VACIADO DE CUERPO PARA BUZON UND 4 4 4 4 4 4 4 4

6 DESENCOFRADO DE CUERPO PARA BUZON UND 4 4 4 4 4 4 4 4

7 SOLAQUEO DE CUERPO DE BUZON UND 4 4 4 4 4 4 4 4

110 100.07 139.94 76.25 131.57 149.8 149.15 142.87 131.32 129.37 95.34
8 EXCAVACIÓN DE ZANJA PARA TUBERIA 200 MM ML
61C @ 62A 62A @ 64A 64A @ 67 67A @ 71 71A @ 74 74 @ 78 78 @ 80 80 @ 84 84 @ 87 87 @ 91 91 @ 974

110 100.07 139.94 76.25 131.57 149.8 149.15 142.87 131.32 129.37 95.34
9 REFINE Y NIVELACIÓN DE ZANJA T. NORMAL, P/ DESAGÜE ML
61C @ 62A 62A @ 64A 64A @ 67 67A @ 71 71A @ 74 74 @ 78 78 @ 80 80 @ 84 84 @ 87 87 @ 91 91 @ 974

110 100.07 139.94 76.25 131.57 149.8 149.15 142.87 131.32 129.37 95.34
10 CAMA DE ARENA EN ZANJA H=0.10 A H=0.60 ML
61C @ 62A 62A @ 64A 64A @ 67 67A @ 71 71A @ 74 74 @ 78 78 @ 80 80 @ 84 84 @ 87 87 @ 91 91 @ 974

110 100.07 139.94 76.25 131.57 149.8 149.15 142.87 131.32 129.37 95.34
11 SUMINISTRO DE TUBERÍA DN 200MM ML
61C @ 62A 62A @ 64A 64A @ 67 67A @ 71 71A @ 74 74 @ 78 78 @ 80 80 @ 84 84 @ 87 87 @ 91 91 @ 974

110 100.07 139.94 76.25 131.57 149.8 149.15 142.87 131.32 129.37 95.34
12 INSTALACIÓN DE TUBERÍA DN 200 MM ML
61C @ 62A 62A @ 64A 64A @ 67 67A @ 71 71A @ 74 74 @ 78 78 @ 80 80 @ 84 84 @ 87 87 @ 91 91 @ 974

8 8
13 VACIADO DE 1/2 CAÑA UND 4 4 4 4 4 4 4

8 8
14 EMBOQUILLADO UND 4 4 4 4 4 4 4

15 EXCAVACION DE ZANJA PARA CONEXIONES DOMICILIARIAS UND 8 8 8 8 8 8 8 6 2 7 2 1

16 REFINE DE ZANJA PARA CONEXIONES DOMICILIARIAS UND 8 8 8 8 8 8 8 6 2 7 2 1

17 CAMA DE ARENA PARA CONEXIONES DOMICILIARIAS UND 8 8 8 8 8 8 8 6 2 7 2 1

SUMINISTRO DE TUBERIA PARA CONEXIONES


18
DOMICILIARIAS
UND 8 8 8 8 8 8 8 6 2 7 2 1

INSTALACION DE TUBERIA PARA CONEXIONES


19
DOMICILIARIAS
UND 8 8 8 8 8 8 8 6 2 7 2 1

110 100.07 139.94 207.82 298.95 274.19


20 PRUEBA HIDRÁULICA A ZANJA ABIERTA UND
61C @ 62A 62A @ 64A 64A @ 67 67A @ 74 74 @ 80 80 @ 87

110 100.07 139.94 207.82 298.95 274.19


21 RELLENO PROTECTOR C/MAT. PROPIO P/TUB 200MM ML
61C @ 62A 62A @ 64A 64A @ 67 67A @ 74 74 @ 80 80 @ 87

22 RELLENO PROTECTOR PARA CONEXIONES DOMICILIARIAS UND 8 8 8 8 8 8 8 6 7

110 100.07 139.94 207.82 298.95 274.19


24 RELLENO Y COMPACTADO C/MAT PROPIO ML 8 8 8 8 8
61C @ 62A 62A @ 64A 64A @ 67 67A @ 74 74 @ 80 80 @ 87

RELLENO Y COMPACTADO C/MAT PROPIO CONEXIONES


25
DOMICILIARIAS
UND 8 8 8 8 8 8 8 6 7

26 ENCOFRADO DE TAPA DE BUZON UND 7 7 7 7 7 7 7 6

27 VACIADO DE TAPA DE BUZON UND 7 7 7 7 7 7 7 6

28 DESENCOFRADO DE TAPA DE BUZON UND 7 7 7 7 7 7 7 6

29 EXCAVACION PARA CAJA DE DESAGUE UND 8 8 8 8 8 8 8 6

30 INSTALACION DE CAJA DE DESAGUE UND 8 8 8 8 8 8 8 6

31 ENCOFRADO PARA CAJA DE DESAGUE UND 8 8 8 8 8 8 8 6

32 VACIADO DE LOSA DE CONCRETO PARA CAJA DE DESAGUE UND 8 8 8 8 8 8 8 6

DESENCOFRADO DE LOSA DE CONCRETO PARA CAJA DE


33
DESAGUE
UND 8 8 8 8 8 8 8 6
PLANIFICACION SETIEMBRE 2021
PROYECTO : "MEJORAMIENTO DE LOS SISTEMAS DE AGUA PARA CONSUMO HUMANO Y ALCANTARILLADO EN OMATE Y ANEXOS, DISTRITO DE OMATE, PROVINCIA GENERAL SANCHEZ CERRO - MOQUEGUA"
CUADRILLA : 05 OPERARIOS Y 09 PEONES
MONTO : S/. 116,913.72

SEMANA N°01 SEMANA N°02 SEMANA N°03 SEMANA N°04 SEMANA N°05
ITEM ACTIVIDADES UNIDAD
9/1/2021 9/2/2021 9/3/2021 9/4/2021 9/6/2021 9/7/2021 9/8/2021 9/9/2021 9/10/2021 9/11/2021 9/13/2021 9/14/2021 9/15/2021 9/16/2021 9/17/2021 9/18/2021 9/20/2021 9/21/2021 9/22/2021 9/23/2021 9/24/2021 9/25/2021 9/27/2021 9/28/2021 9/29/2021 9/30/2021

II.00 ANEXO DE TAMAÑA

8 8 6 6 10
1 EXCAVACION PARA BUZON UND
bz420 @ bz413 bz412 @ bz406-B bzA @ bzF bzG @ bz459 bz406_19 @ bz406_28

8 8 6 6 10
2 PERFILADO DE EXCAVACION PARA BUZON UND
bz420 @ bz413 bz412 @ bz406-B bzA @ bzF bzG @ bz459 bz406_19 @ bz406_28

4 4 4 4 6 6 10
3 VACIADO DE PISO PARA BUZON UND
bz420 @ bz417 bz417 @ bz413 bz412 @ bz409 bz409 @ bz406-B bzA @ bzF bzG @ bz459 bz406_19 @ bz406_28

4 4 4 4 4 2 6 5 5
4 ENCOFRADO DE CUERPO PARA BUZON UND
bz420 @ bz417 bz417 @ bz413 bz412 @ bz409 bz409 @ bz406-B bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_24 @ bz406_28

4 4 4 4 4 2 6 5 5
5 VACIADO DE CUERPO PARA BUZON UND
bz420 @ bz417 bz417 @ bz413 bz412 @ bz409 bz409 @ bz406-B bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_24 @ bz406_28

4 4 4 4 4 2 6 5 5
6 DESENCOFRADO DE CUERPO PARA BUZON UND
bz420 @ bz417 bz417 @ bz413 bz412 @ bz409 bz409 @ bz406-B bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_24 @ bz406_28

4 4 4 4 4 2 6 5 5
7 SOLAQUEO DE CUERPO DE BUZON UND
bz420 @ bz417 bz417 @ bz413 bz412 @ bz409 bz409 @ bz406-B bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_24 @ bz406_28

76.83 94.41 81.68 49.78 118.39 135.98 133.92


8 EXCAVACIÓN DE ZANJA PARA TUBERIA 200 MM ML
bz406_4 @ bz406 / bz406_6 @ bz406_9 /
bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_23 @ bz406_28
bz406_5 @ bz406_6 bz406_13 @ bz406_12
76.83 94.41 81.68 49.78 118.39 135.98 133.92
9 REFINE Y NIVELACIÓN DE ZANJA T. NORMAL, P/ DESAGÜE ML
bz406_4 @ bz406 / bz406_6 @ bz406_9 /
bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_23 @ bz406_28
bz406_5 @ bz406_6 bz406_13 @ bz406_12
76.83 94.41 81.68 49.78 118.39 135.98 133.92
10 CAMA DE ARENA EN ZANJA H=0.10 A H=0.60 ML
bz406_4 @ bz406 / bz406_6 @ bz406_9 /
bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_23 @ bz406_28
bz406_5 @ bz406_6 bz406_13 @ bz406_12
76.83 94.41 81.68 49.78 118.39 135.98 133.92
11 SUMINISTRO DE TUBERÍA DN 200MM ML
bz406_4 @ bz406 / bz406_6 @ bz406_9 /
bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_23 @ bz406_28
bz406_5 @ bz406_6 bz406_13 @ bz406_12
76.83 94.41 81.68 49.78 118.39 135.98 133.92
12 INSTALACIÓN DE TUBERÍA DN 200 MM ML
bz406_4 @ bz406 / bz406_6 @ bz406_9 /
bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_23 @ bz406_28
bz406_5 @ bz406_6 bz406_13 @ bz406_12
4 4 4 4 4 2 6 5 5
13 VACIADO DE 1/2 CAÑA UND
bz420 @ bz417 bz417 @ bz413 bz412 @ bz409 bz409 @ bz406-B bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_24 @ bz406_28

4 4 4 4 4 2 6 5 5
14 EMBOQUILLADO UND
bz420 @ bz417 bz417 @ bz413 bz412 @ bz409 bz409 @ bz406-B bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_24 @ bz406_28

5 4 2 2 4 2 4
15 EXCAVACION DE ZANJA PARA CONEXIONES DOMICILIARIAS UND
bz406_6 @ bz406_9 /
bz406_5 @ bz406_6 bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_24 @ bz406_28
bz406_13 @ bz406_12
5 4 2 2 4 2 4
16 REFINE DE ZANJA PARA CONEXIONES DOMICILIARIAS UND
bz406_6 @ bz406_9 /
bz406_5 @ bz406_6 bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_24 @ bz406_28
bz406_13 @ bz406_12
5 4 2 2 4 2 4
17 CAMA DE ARENA PARA CONEXIONES DOMICILIARIAS UND
bz406_6 @ bz406_9 /
bz406_5 @ bz406_6 bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_24 @ bz406_28
bz406_13 @ bz406_12
5 4 2 2 4 2 4
SUMINISTRO DE TUBERIA PARA CONEXIONES
18 UND
DOMICILIARIAS bz406_6 @ bz406_9 /
bz406_5 @ bz406_6 bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_24 @ bz406_28
bz406_13 @ bz406_12
5 4 2 2 4 2 4
INSTALACION DE TUBERIA PARA CONEXIONES
19 UND
DOMICILIARIAS bz406_6 @ bz406_9 /
bz406_5 @ bz406_6 bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_24 @ bz406_28
bz406_13 @ bz406_12
76.83 94.41 131.46 118.39 269.9
20 PRUEBA HIDRÁULICA A ZANJA ABIERTA UND
bz406_4 @ bz406 / bz406_6 @ bz406_9 /
bzA @ bzF bzG @ bz459 bz406_19 @ bz406_28
bz406_5 @ bz406_6 bz406_13 @ bz406_12
76.83 94.41 131.46 118.39 269.9
21 RELLENO PROTECTOR C/MAT. PROPIO P/TUB 200MM ML
bz406_4 @ bz406 / bz406_6 @ bz406_9 /
bzA @ bzF bzG @ bz459 bz406_19 @ bz406_28
bz406_5 @ bz406_6 bz406_13 @ bz406_12

5 4 6 4 6
22 RELLENO PROTECTOR PARA CONEXIONES DOMICILIARIAS UND
bz406_4 @ bz406 / bz406_6 @ bz406_9 /
bzA @ bzF bzG @ bz459 bz406_19 @ bz406_28
bz406_5 @ bz406_6 bz406_13 @ bz406_12
76.83 94.41 131.46 118.39 269.9
24 RELLENO Y COMPACTADO C/MAT PROPIO ML
bz406_4 @ bz406 / bz406_6 @ bz406_9 /
bzA @ bzF bzG @ bz459 bz406_19 @ bz406_28
bz406_5 @ bz406_6 bz406_13 @ bz406_12
5 4 6 4 6
RELLENO Y COMPACTADO C/MAT PROPIO CONEXIONES
25 UND
DOMICILIARIAS bz406_4 @ bz406 / bz406_6 @ bz406_9 /
bzA @ bzF bzG @ bz459 bz406_19 @ bz406_28
bz406_5 @ bz406_6 bz406_13 @ bz406_12
4 4 4 4 4 2 6 5 5
26 ENCOFRADO DE TAPA DE BUZON UND
bz420 @ bz417 bz417 @ bz413 bz412 @ bz409 bz409 @ bz406-B bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_24 @ bz406_28

4 4 4 4 4 2 6 5 5
27 VACIADO DE TAPA DE BUZON UND
bz420 @ bz417 bz417 @ bz413 bz412 @ bz409 bz409 @ bz406-B bzA @ bzD bzD @ bzF bzG @ bz459 bz406_19 @ bz406_23 bz406_24 @ bz406_28

4 4 4 4 6 6 5 5
28 DESENCOFRADO DE TAPA DE BUZON UND
bz420 @ bz417 bz417 @ bz413 bz412 @ bz409 bz409 @ bz406-B bzA @ bzD bzG @ bz459 bz406_19 @ bz406_23 bz406_24 @ bz406_28

5 4 4 4 6
29 EXCAVACION PARA CAJA DE DESAGUE UND
bz406_6 @ bz406_9 /
bz406_5 @ bz406_6 bzA @ bzF bzG @ bz459 bz406_19 @ bz406_28
bz406_13 @ bz406_12
5 4 4 4 6
30 INSTALACION DE CAJA DE DESAGUE UND
bz406_6 @ bz406_9 /
bz406_5 @ bz406_6 bzA @ bzF bzG @ bz459 bz406_19 @ bz406_28
bz406_13 @ bz406_12
5 4 4 4 6
31 ENCOFRADO PARA CAJA DE DESAGUE UND
bz406_6 @ bz406_9 /
bz406_5 @ bz406_6 bzA @ bzF bzG @ bz459 bz406_19 @ bz406_28
bz406_13 @ bz406_12
5 4 4 4 6
32 VACIADO DE LOSA DE CONCRETO PARA CAJA DE DESAGUE UND
bz406_6 @ bz406_9 /
bz406_5 @ bz406_6 bzA @ bzF bzG @ bz459 bz406_19 @ bz406_28
bz406_13 @ bz406_12
5 4 4 4 6
DESENCOFRADO DE LOSA DE CONCRETO PARA CAJA DE
33 UND
DESAGUE bz406_6 @ bz406_9 /
bz406_5 @ bz406_6 bzA @ bzF bzG @ bz459 bz406_19 @ bz406_28
bz406_13 @ bz406_12
PLANIFICACION OCTUBRE 2021
PROYECTO : "MEJORAMIENTO DE LOS SISTEMAS DE AGUA PARA CONSUMO HUMANO Y ALCANTARILLADO EN OMATE Y ANEXOS, DISTRITO DE OMATE, PROVINCIA GENERAL SANCHEZ CERRO - MOQUEGUA"
CUADRILLA : 05 OPERARIO +05 PEONES
MONTO : S/. 140,773.74

SEMANA N°01 SEMANA N°02 SEMANA N°03 SEMANA N°04 SEMANA N°05
ITEM ACTIVIDADES UNIDAD
10/1/2021 10/2/2021 10/4/2021 10/5/2021 10/6/2021 10/7/2021 10/11/2021 10/12/2021 10/13/2021 10/14/2021 10/15/2021 10/16/2021 10/18/2021 10/19/2021 10/20/2021 10/21/2021 10/22/2021 10/23/2021 10/25/2021 10/26/2021 10/27/2021 10/28/2021 10/29/2021 10/30/2021

I.00 ESCOBAYA COLECTORA

2 2 2 3 2 3 2 2 2 2 1 2 1 1 1 2
1 EXCAVACION PARA BUZON UND
BZ 784, BZ 783, BZ BZ 780, BZ 781, BZ
BZ 790, BZ 789 BZ 788, BZ 787 BZ 786, BZ 785 BZ 776-Q, BZ 776-52 BZ 840, BZ 841 BZ 842, BZ 843 BZ 844, BZ 845 BZ 846, BZ 847 BZ 848 BZ A-13, BZ A-14 BZ A-15 BZ 16 BZ 17 BZ 18, BZ 19
782 777-11A

2 2 2 3 2 3 2 2 2 2 1 2 1 1 1 2
2 PERFILADO DE EXCAVACION PARA BUZON UND
BZ 784, BZ 783, BZ BZ 780, BZ 781, BZ
BZ 790, BZ 789 BZ 788, BZ 787 BZ 786, BZ 785 BZ 776-Q, BZ 776-52 BZ 840, BZ 841 BZ 842, BZ 843 BZ 844, BZ 845 BZ 846, BZ 847 BZ 848 BZ A-13, BZ A-14 BZ A-15 BZ 16 BZ 17 BZ 18, BZ 19
782 777-11A

2 2 2 3 2 3 2 2 2 2 1 2 1 1 1 2
3 VACIADO DE PISO PARA BUZON UND
BZ 784, BZ 783, BZ BZ 780, BZ 781, BZ
BZ 790, BZ 789 BZ 788, BZ 787 BZ 786, BZ 785 BZ 776-Q, BZ 776-52 BZ 840, BZ 841 BZ 842, BZ 843 BZ 844, BZ 845 BZ 846, BZ 847 BZ 848 BZ A-13, BZ A-14 BZ A-15 BZ 16 BZ 17 BZ 18, BZ 19
782 777-11A

2 2 2 3 2 3 2 2 2 2 1 2 1 1 1 2

4 ENCOFRADO DE CUERPO PARA BUZON UND


BZ 784, BZ 783, BZ BZ 780, BZ 781, BZ
BZ 790, BZ 789 BZ 788, BZ 787 BZ 786, BZ 785 BZ 776-Q, BZ 776-52 BZ 840, BZ 841 BZ 842, BZ 843 BZ 844, BZ 845 BZ 846, BZ 847 BZ 848 BZ A-13, BZ A-14 BZ A-15 BZ 16 BZ 17 BZ 18, BZ 19
782 777-11A

2 2 2 3 2 3 2 2 2 2 1 2 1 1 1 2
5 VACIADO DE CUERPO PARA BUZON UND
BZ 784, BZ 783, BZ BZ 780, BZ 781, BZ
BZ 790, BZ 789 BZ 788, BZ 787 BZ 786, BZ 785 BZ 776-Q, BZ 776-52 BZ 840, BZ 841 BZ 842, BZ 843 BZ 844, BZ 845 BZ 846, BZ 847 BZ 848 BZ A-13, BZ A-14 BZ A-15 BZ 16 BZ 17 BZ 18, BZ 19
782 777-11A

2 2 2 3 2 3 2 2 2 2 1 2 1 1 1 2

6 DESENCOFRADO DE CUERPO PARA BUZON UND BZ 784, BZ 783, BZ BZ 780, BZ 781, BZ


BZ 790, BZ 789 BZ 788, BZ 787 BZ 786, BZ 785 BZ 776-Q, BZ 776-52 BZ 840, BZ 841 BZ 842, BZ 843 BZ 844, BZ 845 BZ 846, BZ 847 BZ 848 BZ A-13, BZ A-14 BZ A-15 BZ 16 BZ 17 BZ 18, BZ 19
782 777-11A

2 2 2 3 2 3 2 2 2 2 1 2 1 1 1 2

7 SOLAQUEO DE CUERPO DE BUZON UND BZ 784, BZ 783, BZ BZ 780, BZ 781, BZ


BZ 790, BZ 789 BZ 788, BZ 787 BZ 786, BZ 785 BZ 776-Q, BZ 776-52 BZ 840, BZ 841 BZ 842, BZ 843 BZ 844, BZ 845 BZ 846, BZ 847 BZ 848 BZ A-13, BZ A-14 BZ A-15 BZ 16 BZ 17 BZ 18, BZ 19
782 777-11A

28.36 37.43 30.17 34.67 93.27 93.78 96.23 92.01 73.09 61.54
EXCAVACIÓN DE ZANJA PARA TUBERIA 200
8 ML
MM BZ 790@ BZ 789 BZ 789 @ BZ 787 BZ 787@ BZ 785 BZ 785@ BZ 784 BZ 776-Q @ BZ 780 BZ 780@ BZ 782 BZ 840 @ BZ 845 BZ 845 @ BZ 849 BZ A-12@ BZ A-15 BZ A-15 @BZ A-20

28.36 37.43 30.17 34.67 93.27 93.78 96.23 92.01 73.09 61.54
REFINE Y NIVELACIÓN DE ZANJA T.
9 ML
NORMAL, P/ DESAGÜE BZ 790@ BZ 789 BZ 789 @ BZ 787 BZ 787@ BZ 785 BZ 785@ BZ 784 BZ 776-Q @ BZ 780 BZ 780@ BZ 782 BZ 840 @ BZ 845 BZ 845 @ BZ 849 BZ A-12@ BZ A-15 BZ A-15 @BZ A-20

28.36 37.43 30.17 34.67 93.27 93.78 96.23 92.01 73.09 61.54

10 CAMA DE ARENA EN ZANJA H=0.10 A H=0.60 ML


BZ 790@ BZ 789 BZ 789 @ BZ 787 BZ 787@ BZ 785 BZ 785@ BZ 784 BZ 776-Q @ BZ 780 BZ 780@ BZ 783 BZ 840 @ BZ 845 BZ 845 @ BZ 849 BZ A-12@ BZ A-15 BZ A-15 @BZ A-20

28.36 37.43 30.17 34.67 93.27 93.78 96.23 92.01 73.09 61.54

11 SUMINISTRO DE TUBERÍA DN 200MM ML


BZ 790@ BZ 789 BZ 789 @ BZ 787 BZ 787@ BZ 785 BZ 785@ BZ 784 BZ 776-Q @ BZ 780 BZ 780@ BZ 784 BZ 840 @ BZ 845 BZ 845 @ BZ 849 BZ A-12@ BZ A-15 BZ A-15 @BZ A-20

28.36 37.43 30.17 34.67 93.27 93.78 96.23 92.01 73.09 61.54

12 INSTALACIÓN DE TUBERÍA DN 200 MM ML


BZ 790@ BZ 789 BZ 789 @ BZ 787 BZ 787@ BZ 785 BZ 785@ BZ 784 BZ 776-Q @ BZ 780 BZ 780@ BZ 785 BZ 840 @ BZ 845 BZ 845 @ BZ 849 BZ A-12@ BZ A-15 BZ A-15 @BZ A-20

3 2 2 2 2 2 2 2 3 3 3 5

14 VACIADO DE 1/2 CAÑA UND BZ A-16, BZ A 17,


BZ 790, BZ 789, BZ BZ 776-Q, BZ 776 BZ 843, BZ 844, BZ BZ 846, BZ 847, BZ BZA-13, BZ A-14,
BZ 787, BZ 786 BZ 785, BZ 784 BZ 783, BZ 782 BZ 780, BZ 781 BZ 777-11A, BZ 840 BZ 841, BZ 842 BZ A-15 BZ A-18, BZ A-19,
788 -52 845 848
BZ A-20

130.63 187.05 188.24 134.63

15 PRUEBA HIDRÁULICA A ZANJA ABIERTA ML


BZ 790 @ 784 BZ 776-Q @ BZ 782 BZ 840@ BZ 849 BZ A-12@ BZ A-20

130.63 187.05 188.24 134.63

RELLENO PROTECTOR C/MAT. PROPIO


16 ML
P/TUB 200MM BZ 790 @ 784 BZ 776-Q @ BZ 782 BZ 840@ BZ 849 BZ A-12@ BZ A-20

130.63 187.05 188.24 134.63

18 RELLENO Y COMPACTADO C/MAT PROPIO ML


BZ 790 @ 784 BZ 776-Q @ BZ 782 BZ 840@ BZ 849 BZ A-12@ BZ A-20

6 5 2 6 5 9

BZ A12, BZ A13, BZ
19 ENCOFRADO DE TECHO DE BUZON UND
BZ 790, 788, 787, BZ 783, 782, 781, BZ 840, 841, BZ 845, 846, 847, A14, A 15, A 16, A
BZ 776-52, BZ 11A
786, 785, BZ 784 780, 776-Q 842,842, 843, 844 848, 849 17, BZ A18, BZ A 19,
BZ A20

6 5 2 6 5 9

BZ A12, BZ A13, BZ
20 VACIADO DE TAPA DE BUZON UND
BZ 790, 788, 787, BZ 783, 782, 781, BZ 840, 841, BZ 845, 846, 847, A14, A 15, A 16, A
BZ 776-52, BZ 11A
786, 785, BZ 784 780, 776-Q 842,842, 843, 844 848, 849 17, BZ A18, BZ A 19,
BZ A20
CHICHILIN COGRI ESCOBAYA - SAN FRANCISCO TAMAÑA
TUBERIA (m) BUZONES = 38 UND TUBERIA (m) BUZONES = 53 UND TUBERIA (m) BUZONES = 30 UND TUBERIA (m) BUZONES = 38 UND
BZCHI 62A h=1.40 BZ-24 h=1.20 BZ - 850 h =1.20 BZ-459 h=1.38
BZCHI 62 h=1.40 BZ-25 h=1.20 BZ - 851 h =1.40 BZ-458 h=1.25
BZCHI 63B h=1.20 BZ-27 h=1.30 BZ - 852 h =1.30 BZ-457 h=1.50 3,168.25
BZCHI 63A h=1.20 BZ-33 h=1.30 BZ - 855 h =1.20 BZ-456 h=1.40
BZCHI 63 h=1.20 BZ-33A h=1.20 BZ - 849 h =1.60 BZ-H h=1.40
BZCHI 64B h=1.20 BZ-34 h=1.40 BZ - 853 h =1.95 BZ-E h=1.40
BZCHI 64A h=1.20 BZ-129 h=1.50 BZ - 854 h =1.60 BZ-B h=1.20
BZCHI 65A h=1.20 BZ-28 h=1.4 BZ - 846 h =2.35 BZ-A h=1.20
BZCHI 65 h=1.20 BZ-35A h=1.5 BZ - 847 h =2.36 BZ_D h=1.65
BZCHI 66 h=1.20 BZ-36 h=1.4 BZ - 856 h =2.44 BZ_C h=1.65
BZCHI 67 h=1.20 BZ-127 h=1.4 BZ - 840 h =2.53 BZ_G h=2.80
BZCHI 68 h=1.20 BZ-128 h=1.4 BZ - 841 h =2.79 BZ_F h=2.65
BZCHI 74 h=1.20 BZ-38 h=1.5 BZ - 848 h =2.65 BZ - 406-B h =1.40
BZCHI 75 h=1.20 BZ-39 h=1.5 BZ - 842 h =3.28 BZ - 407 h =1.40
BZCHI 76 h=1.20 BZ-40 h=1.4 BZ - 843 h =3.31 BZ - 408 h =1.30
751.29
BZCHI 77 h=1.40 BZ-41 h=1.3 BZ - 844 h =3.30 BZ - 409 h =1.30
BZCHI 78 h=1.40 BZ-36 h=1.30 BZ - 845 h =3.37 BZ - 410 h =1.20
BZCHI 79 h=1.40 BZ-42 h=1.2 BZ - 857 h =3.47 BZ - 411 h =1.20
BZCHI 80 h=1.40 BZ-32 h=1.2 BZ - A-13 h =3.39 BZ - 412-A h =1.50
1,655.76 761.2
BZCHI 81 h=1.40 BZ-31 h=1.3 BZ - A-14 h =3.41 BZ - 412 h =1.50
BZCHI 82 h=1.40 BZ-45 h=1.2 BZ - A-15 h =3.44 BZ - 413 h =1.30
BZCHI 83 h=1.40 BZ-44 h=1.4 BZ - A-19 h =3.33 BZ - 414 h =1.50
BZCHI 84 h=1.40 BZ-46 h=1.3 BZ - 858 h =3.98 BZ - 415 h =1.30
BZCHI 85 h=1.40 BZ-47 h=1.2 BZ - 859 h =3.71 BZ - 416 h =1.50
BZCHI 86 h=1.40 BZ-48 h=1.2 BZ - 859A h =3.86 BZ - 417 h =1.50
BZCHI 87 h=1.40 BZ-125 h=1.2 BZ - 860 h =4.55 BZ - 418 h =1.40
BZCHI 88 h=1.40 0 BZ-49 h=1.4 BZ - A-16 h =6.64 BZ - 419 h =1.25
BZCHI 89 h=1.40 BZ-49A h=1.4 BZ - A-17 h =7.47 BZ - 420 h =1.35
BZCHI 90 h=1.40 BZ-50 h=1.4 BZ - A-18 h =4.25 BZ - 406_19 h =1.20
BZCHI 91 h=1.40 BZ-51 h=1.40 BZ - 859B h =4.53 BZ - 406_20 h =1.20
BZCHI 92 h=1.40 BZ-52 h=1.50 BZ - 406_21 h =1.20
BZCHI 93 h=1.40 BZ-53 h=1.20 BZ - 406_22 h =1.20
BZ 974 h=1.40 BZ-61 h=1.30 BZ - 406_23 h =1.21
BZCHI 71 h=2.00 BZ-133 h=1.30 BZ - 406_25 h =1.20
BZCHI 70 h=2.70 BZ-62 h=1.30 BZ - 406_26 h =1.20
BZCHI 72 h=2.70 BZ-63 h=1.50 BZ - 406_27 h =1.20
BZCHI 73 h=2.70 BZ-65 h=1.40 BZ - 406_28 h =1.20
BZCHI 69 h=3.40 BZ-66A h=1.40 BZ - 406_24 h =2.20
BZ-66 h=1.30
BZ-68A h=1.40
BZ-55 h=1.2
BZ-123 h=1.20
BZ-558 h=1.20
BZ-558A h=1.2
BZ-558B h=1.2
BZ-558C h=1.20
BZ-35 h=1.60
BZ-134 h=1.60
BZ-67 h=1.60
BZ-68 h=1.80
BZ - 30 H 2.43
BZ-37 h=2.95
BZ-69 h=3.20