Está en la página 1de 9

ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL

CONTRATISTA: CONSORCIO SURVIAL PERUANO


CONTRATISTAS INGENIEROS ASOCIADOS SAC
OBRA: Carretera EMP. PE 1S (El Fiscal) – Ventillata – Cocachacra – EMP. PE 1SD (Punta de Bombón)

ANCHO DE SUPERFICE RECAPEADA (ASFALTADA)

TRAMO I: EMP. PE 1S (EL FISCAL) - VENTILLATA - COCACHACRA (KM. 0+000 AL 11+600)

PROGRESIVA ANCHO EFECTIVO


TIPO DE PENDIENTE DE ANCHO SUPERFICIE
ITEM SUPERFICIE LARGO
TERRENO PERFIL (%) ASFALTADA
INICIO FINAL ASFALTADA

1 4+720 4+740 TIPO 1 -1.230% 8.46 8.40 20.00


2 4+740 4+760 TIPO 1 -1.230% 8.46 8.40 20.00
3 4+760 4+780 TIPO 1 -1.230% 8.46 8.40 20.00
4 4+780 4+800 TIPO 1 -1.230% 8.46 8.40 20.00
5 4+800 4+820 TIPO 1 -1.230% 8.46 8.40 20.00
6 4+820 4+840 TIPO 1 -1.230% 8.46 8.40 20.00
7 4+840 4+860 TIPO 1 -0.970% 8.46 8.40 20.00
8 4+860 4+880 TIPO 1 -0.970% 8.46 8.40 20.00
9 4+880 4+900 TIPO 1 -0.970% 8.44 8.40 20.00
10 4+900 4+920 TIPO 1 -0.970% 8.44 8.40 20.00
11 4+920 4+940 TIPO 1 -0.810% 8.44 8.40 20.00
12 4+940 4+960 TIPO 1 -0.810% 8.44 8.40 20.00
13 4+960 4+980 TIPO 1 -0.810% 8.44 8.40 20.00
14 4+980 5+000 TIPO 1 -0.580% 8.46 8.40 20.00
15 5+000 5+020 TIPO 1 -0.580% 8.46 8.40 20.00
16 5+020 5+040 TIPO 1 -0.580% 8.46 8.40 20.00
17 5+040 5+060 TIPO 1 -0.800% 8.46 8.40 20.00
18 5+060 5+080 TIPO 1 -0.800% 8.46 8.40 20.00
19 5+080 5+100 TIPO 1 -0.800% 8.45 8.40 20.00
20 5+100 5+120 TIPO 1 -0.800% 8.45 8.40 20.00
21 5+120 5+140 TIPO 1 -0.800% 8.45 8.40 20.00
22 5+140 5+160 TIPO 1 -0.870% 8.45 8.40 20.00
23 5+160 5+180 TIPO 1 -0.870% 8.45 8.40 20.00
24 5+180 5+200 TIPO 1 -0.870% 8.43 8.40 20.00
25 5+200 5+220 TIPO 1 -0.870% 8.43 8.40 20.00
26 5+220 5+240 TIPO 1 -0.870% 8.43 8.40 20.00
27 5+240 5+260 TIPO 1 -0.870% 8.43 8.40 20.00
28 5+260 5+280 TIPO 1 -0.500% 8.43 8.40 20.00
29 5+280 5+300 TIPO 1 -0.500% 8.43 8.40 20.00
30 5+300 5+320 TIPO 1 -0.830% 8.43 8.40 20.00
31 5+320 5+340 TIPO 1 -0.830% 8.43 8.40 20.00
32 5+340 5+360 TIPO 1 -0.830% 8.43 8.40 20.00
33 5+360 5+380 TIPO 1 -0.830% 8.43 8.40 20.00
34 5+380 5+400 TIPO 1 -0.830% 8.44 8.40 20.00
35 5+400 5+420 TIPO 1 -0.830% 8.44 8.40 20.00
36 5+420 5+440 TIPO 1 -0.830% 8.44 8.40 20.00
37 5+440 5+460 TIPO 1 -0.830% 8.44 8.40 20.00
38 5+460 5+480 TIPO 1 -0.830% 8.44 8.40 20.00
39 5+480 5+500 TIPO 1 -0.830% 8.44 8.40 20.00
40 5+500 5+520 TIPO 1 -0.830% 8.44 8.40 20.00
41 5+520 5+540 TIPO 1 -0.830% 8.44 8.40 20.00
42 5+540 5+560 TIPO 1 -0.830% 8.44 8.40 20.00
43 5+560 5+580 TIPO 1 -0.830% 8.44 8.40 20.00
44 5+580 5+600 TIPO 1 -0.700% 8.46 8.40 20.00
45 5+600 5+620 TIPO 1 -0.700% 8.46 8.40 20.00
ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL
CONTRATISTA: CONSORCIO SURVIAL PERUANO
CONTRATISTAS INGENIEROS ASOCIADOS SAC
OBRA: Carretera EMP. PE 1S (El Fiscal) – Ventillata – Cocachacra – EMP. PE 1SD (Punta de Bombón)

ANCHO DE SUPERFICE RECAPEADA (ASFALTADA)

TRAMO I: EMP. PE 1S (EL FISCAL) - VENTILLATA - COCACHACRA (KM. 0+000 AL 11+600)

PROGRESIVA ANCHO EFECTIVO


TIPO DE PENDIENTE DE ANCHO SUPERFICIE
ITEM SUPERFICIE LARGO
TERRENO PERFIL (%) ASFALTADA
INICIO FINAL ASFALTADA

46 5+620 5+640 TIPO 1 -0.980% 8.46 8.40 20.00


47 5+640 5+660 TIPO 1 -0.980% 8.46 8.40 20.00
48 5+660 5+680 TIPO 1 -0.980% 8.46 8.40 20.00
49 5+680 5+700 TIPO 1 -0.980% 8.46 8.40 20.00
50 5+700 5+720 TIPO 1 -0.980% 8.46 8.40 20.00
51 5+720 5+740 TIPO 1 -0.580% 8.46 8.40 20.00
52 5+740 5+760 TIPO 1 -0.580% 8.46 8.40 20.00
53 5+760 5+780 TIPO 1 -0.850% 8.46 8.40 20.00
54 5+780 5+800 TIPO 1 -0.850% 8.46 8.40 20.00
55 5+800 5+820 TIPO 1 -0.850% 8.46 8.40 20.00
56 5+820 5+840 TIPO 1 -0.850% 8.46 8.40 20.00
57 5+840 5+860 TIPO 1 -0.850% 8.46 8.40 20.00
58 5+860 5+880 TIPO 1 -0.850% 8.46 8.40 20.00
59 5+880 5+900 TIPO 1 -0.850% 8.46 8.40 20.00
60 5+900 5+920 TIPO 1 -0.850% 8.46 8.40 20.00
61 5+920 5+940 TIPO 1 -0.510% 8.46 8.40 20.00
62 5+940 5+960 TIPO 1 -0.510% 8.46 8.40 20.00
63 5+960 5+980 TIPO 1 -0.510% 8.46 8.40 20.00
64 5+980 6+000 TIPO 1 -0.510% 8.46 8.40 20.00
65 6+000 6+020 TIPO 1 -0.510% 8.46 8.40 20.00
66 6+020 6+040 TIPO 1 -0.510% 8.46 8.40 20.00
67 6+040 6+060 TIPO 1 -0.510% 8.46 8.40 20.00
68 6+060 6+080 TIPO 1 -0.510% 8.46 8.40 20.00
69 6+080 6+100 TIPO 1 -0.510% 8.46 8.40 20.00
70 6+100 6+120 TIPO 1 -0.510% 8.46 8.40 20.00
71 6+120 6+140 TIPO 1 -0.510% 8.46 8.40 20.00
72 6+140 6+160 TIPO 1 -0.510% 8.46 8.40 20.00
73 6+160 6+180 TIPO 1 -0.510% 8.46 8.40 20.00
74 6+180 6+200 TIPO 1 -0.510% 8.46 8.40 20.00
75 6+200 6+220 TIPO 1 0.570% 8.46 8.40 20.00
76 6+220 6+240 TIPO 1 0.570% 8.46 8.40 20.00
77 6+240 6+260 TIPO 1 0.570% 8.46 8.40 20.00
78 6+260 6+280 TIPO 1 0.570% 8.46 8.40 20.00
79 6+280 6+300 TIPO 1 0.570% 8.46 8.40 20.00
80 6+300 6+320 TIPO 1 0.570% 8.46 8.40 20.00
81 6+320 6+340 TIPO 1 0.570% 8.46 8.40 20.00
82 6+340 6+360 TIPO 1 0.570% 8.46 8.40 20.00
83 6+360 6+380 TIPO 1 0.570% 8.46 8.40 20.00
84 6+380 6+400 TIPO 1 0.570% 8.44 8.40 20.00
85 6+400 6+420 TIPO 1 0.570% 8.42 8.40 20.00
86 6+420 6+440 TIPO 1 0.570% 8.42 8.40 20.00
87 6+440 6+460 TIPO 1 0.570% 8.42 8.40 20.00
88 6+460 6+480 TIPO 1 0.570% 8.42 8.40 20.00
89 6+480 6+500 TIPO 1 -0.710% 8.42 8.40 20.00
90 6+500 6+520 TIPO 1 -0.710% 8.23 8.40 20.00
ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL
CONTRATISTA: CONSORCIO SURVIAL PERUANO
CONTRATISTAS INGENIEROS ASOCIADOS SAC
OBRA: Carretera EMP. PE 1S (El Fiscal) – Ventillata – Cocachacra – EMP. PE 1SD (Punta de Bombón)

ANCHO DE SUPERFICE RECAPEADA (ASFALTADA)

TRAMO I: EMP. PE 1S (EL FISCAL) - VENTILLATA - COCACHACRA (KM. 0+000 AL 11+600)

PROGRESIVA ANCHO EFECTIVO


TIPO DE PENDIENTE DE ANCHO SUPERFICIE
ITEM SUPERFICIE LARGO
TERRENO PERFIL (%) ASFALTADA
INICIO FINAL ASFALTADA

91 6+520 6+540 TIPO 1 -0.710% 8.02 8.00 20.00


92 6+540 6+560 TIPO 1 -0.710% 8.00 8.00 20.00
93 6+560 6+580 TIPO 1 -0.710% 7.42 7.40 20.00
94 6+580 6+600 TIPO 1 -0.710% 7.42 7.40 20.00
95 6+600 6+620 TIPO 1 -0.710% 7.40 7.40 20.00
96 6+620 6+640 TIPO 1 -0.710% 7.40 7.40 20.00
97 6+640 6+660 TIPO 1 -0.710% 7.40 7.40 20.00
98 6+660 6+680 TIPO 1 -0.710% 7.30 7.40 20.00
99 6+680 6+700 TIPO 1 -0.710% 7.30 7.40 20.00
100 6+700 6+720 TIPO 1 -0.960% 7.30 7.40 20.00
101 6+720 6+740 TIPO 1 -0.960% 7.35 7.40 20.00
102 6+740 6+760 TIPO 1 -0.960% 7.35 7.40 20.00
103 6+760 6+780 TIPO 1 -0.960% 7.44 7.40 20.00
104 6+780 6+800 TIPO 1 -0.960% 7.44 7.40 20.00
105 6+800 6+820 TIPO 1 -0.960% 7.44 7.40 20.00
106 6+820 6+830 TIPO 1 -0.960% 7.44 7.40 10.00
107 6+830 6+840 TIPO 1 -0.960% 7.45 7.40 10.00
108 6+840 6+850 TIPO 1 -0.960% 7.44 7.40 10.00
109 6+850 6+860 TIPO 1 -0.430% 7.44 7.40 10.00
110 6+860 6+870 TIPO 1 -0.430% 7.44 7.40 10.00
111 6+870 6+880 TIPO 1 -0.430% 7.44 7.40 10.00
112 6+880 6+890 TIPO 1 -0.430% 7.44 7.40 10.00
113 6+890 6+900 TIPO 1 -0.430% 7.44 7.40 10.00
114 6+900 6+910 TIPO 1 -0.430% 7.50 7.40 10.00
115 6+910 6+920 TIPO 1 -0.430% 7.54 7.40 10.00
116 6+920 6+930 TIPO 1 -0.430% 7.55 7.40 10.00
117 6+930 6+940 TIPO 1 -0.430% 7.55 7.40 10.00
118 6+940 6+950 TIPO 1 -0.430% 7.70 7.80 10.00
119 6+950 6+960 TIPO 1 -0.430% 7.90 8.00 10.00
120 6+960 6+970 TIPO 1 -0.430% 7.90 8.00 10.00
121 6+970 6+980 TIPO 1 -0.430% 7.90 8.00 10.00
122 6+980 6+990 TIPO 1 -0.430% 7.95 8.00 10.00
123 6+990 7+000 TIPO 1 -0.430% 8.00 8.00 10.00
124 7+000 7+010 TIPO 1 -0.770% 8.02 8.00 10.00
125 7+010 7+020 TIPO 1 -0.770% 8.02 8.00 10.00
126 7+020 7+030 TIPO 1 -0.770% 8.02 8.00 10.00
127 7+030 7+040 TIPO 1 -0.770% 8.02 8.00 10.00
128 7+040 7+050 TIPO 1 -0.770% 8.02 8.00 10.00
129 7+050 7+060 TIPO 1 -0.640% 8.02 8.00 10.00
130 7+060 7+070 TIPO 1 -0.640% 8.02 8.00 10.00
131 7+070 7+080 TIPO 1 -0.640% 8.02 8.00 10.00
132 7+080 7+090 TIPO 1 -0.640% 8.02 8.00 10.00
133 7+090 7+100 TIPO 1 -0.640% 8.02 8.00 10.00
134 7+100 7+110 TIPO 1 -0.640% 8.02 8.00 10.00
135 7+110 7+120 TIPO 1 -0.640% 8.02 8.00 10.00
136 7+120 7+130 TIPO 1 -0.640% 8.02 8.00 10.00
137 7+130 7+140 TIPO 1 -0.640% 8.02 8.00 10.00
ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL
CONTRATISTA: CONSORCIO SURVIAL PERUANO
CONTRATISTAS INGENIEROS ASOCIADOS SAC
OBRA: Carretera EMP. PE 1S (El Fiscal) – Ventillata – Cocachacra – EMP. PE 1SD (Punta de Bombón)

ANCHO DE SUPERFICE RECAPEADA (ASFALTADA)

TRAMO I: EMP. PE 1S (EL FISCAL) - VENTILLATA - COCACHACRA (KM. 0+000 AL 11+600)

PROGRESIVA ANCHO EFECTIVO


TIPO DE PENDIENTE DE ANCHO SUPERFICIE
ITEM SUPERFICIE LARGO
TERRENO PERFIL (%) ASFALTADA
INICIO FINAL ASFALTADA

138 7+140 7+150 TIPO 1 -0.640% 8.02 8.00 10.00


139 7+150 7+160 TIPO 1 -0.640% 8.02 8.00 10.00
140 7+160 7+170 TIPO 1 -0.640% 8.02 8.00 10.00
141 7+170 7+180 TIPO 1 -1.250% 8.02 8.00 10.00
142 7+180 7+190 TIPO 1 -1.250% 8.02 8.00 10.00
143 7+190 7+200 TIPO 1 -1.250% 8.02 8.00 10.00
144 7+200 7+210 TIPO 1 -1.250% 8.02 8.00 10.00
145 7+210 7+220 TIPO 1 -1.250% 8.02 8.00 10.00
146 7+220 7+230 TIPO 1 -1.250% 8.02 8.00 10.00
147 7+230 7+240 TIPO 1 -1.250% 8.02 8.00 10.00
148 7+240 7+250 TIPO 1 -1.250% 8.02 8.00 10.00
149 7+250 7+260 TIPO 1 -1.250% 8.02 8.00 10.00
150 7+260 7+270 TIPO 1 -1.250% 8.02 8.00 10.00
151 7+270 7+280 TIPO 1 -1.250% 8.02 8.00 10.00
152 7+280 7+290 TIPO 1 -1.250% 8.02 8.00 10.00
153 7+290 7+300 TIPO 1 -1.250% 8.02 8.00 10.00
154 7+300 7+310 TIPO 1 -1.250% 8.02 8.00 10.00
155 7+310 7+320 TIPO 1 -1.250% 8.02 8.00 10.00
156 7+320 7+330 TIPO 1 -1.250% 8.02 8.00 10.00
157 7+330 7+340 TIPO 1 -1.250% 8.02 8.00 10.00
158 7+340 7+350 TIPO 1 -1.250% 8.02 8.00 10.00
159 7+350 7+360 TIPO 1 -1.250% 8.02 8.00 10.00
160 7+360 7+370 TIPO 1 -1.250% 8.02 8.00 10.00
161 7+370 7+380 TIPO 1 -1.250% 8.02 8.00 10.00
162 7+380 7+390 TIPO 1 -1.250% 8.02 8.00 10.00
163 7+390 7+400 TIPO 1 -1.250% 8.02 8.00 10.00
164 7+400 7+410 TIPO 1 -1.250% 8.02 8.00 10.00
165 7+410 7+420 TIPO 1 -1.250% 8.02 8.00 10.00
166 7+420 7+430 TIPO 1 -1.250% 8.02 8.00 10.00
167 7+430 7+440 TIPO 1 -1.250% 8.02 8.00 10.00
168 7+440 7+450 TIPO 1 -1.250% 8.02 8.00 10.00
169 7+450 7+460 TIPO 1 -1.250% 8.02 8.00 10.00
170 7+460 7+470 TIPO 1 -1.250% 8.02 8.00 10.00
171 7+470 7+480 TIPO 1 -1.250% 8.02 8.00 10.00
172 7+480 7+490 TIPO 1 -1.250% 8.02 8.00 10.00
173 7+490 7+500 TIPO 1 -1.250% 8.02 8.00 10.00
174 7+500 7+510 TIPO 1 -1.250% 8.02 8.00 10.00
175 7+510 7+520 TIPO 1 -1.250% 8.02 8.00 10.00
176 7+520 7+530 TIPO 1 -1.250% 8.02 8.00 10.00
177 7+530 7+540 TIPO 1 -1.160% 8.02 8.00 10.00
178 7+540 7+550 TIPO 1 -1.160% 8.02 8.00 10.00
179 7+550 7+560 TIPO 1 -1.160% 8.02 8.00 10.00
180 7+560 7+570 TIPO 1 -1.160% 8.02 8.00 10.00
181 7+570 7+580 TIPO 1 -1.160% 8.02 8.00 10.00
182 7+580 7+590 TIPO 1 -1.160% 8.02 8.00 10.00
183 7+590 7+600 TIPO 1 -1.160% 8.02 8.00 10.00
184 7+600 7+610 TIPO 1 -1.160% 8.02 8.00 10.00
185 7+610 7+620 TIPO 1 -1.160% 8.02 8.00 10.00
186 7+620 7+630 TIPO 1 -1.160% 8.02 8.00 10.00
187 7+630 7+640 TIPO 1 -1.370% 8.20 8.20 10.00
188 7+640 7+660 TIPO 1 -1.370% 8.30 8.30 20.00
189 7+660 7+680 TIPO 1 -1.370% 8.42 8.40 20.00
ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL
CONTRATISTA: CONSORCIO SURVIAL PERUANO
CONTRATISTAS INGENIEROS ASOCIADOS SAC
OBRA: Carretera EMP. PE 1S (El Fiscal) – Ventillata – Cocachacra – EMP. PE 1SD (Punta de Bombón)

ANCHO DE SUPERFICE RECAPEADA (ASFALTADA)

TRAMO I: EMP. PE 1S (EL FISCAL) - VENTILLATA - COCACHACRA (KM. 0+000 AL 11+600)

PROGRESIVA ANCHO EFECTIVO


TIPO DE PENDIENTE DE ANCHO SUPERFICIE
ITEM SUPERFICIE LARGO
TERRENO PERFIL (%) ASFALTADA
INICIO FINAL ASFALTADA

190 7+680 7+700 TIPO 1 -0.810% 8.42 8.40 20.00


191 7+700 7+720 TIPO 1 -0.810% 8.42 8.40 20.00
192 7+720 7+740 TIPO 1 -0.960% 8.42 8.40 20.00
193 7+740 7+760 TIPO 1 -0.960% 8.42 8.40 20.00
194 7+760 7+780 TIPO 1 -0.960% 8.42 8.40 20.00
195 7+780 7+800 TIPO 1 -0.960% 8.42 8.40 20.00
196 7+800 7+820 TIPO 1 -0.960% 8.42 8.40 20.00
197 7+820 7+840 TIPO 1 -0.960% 8.42 8.40 20.00
198 7+840 7+860 TIPO 1 -0.960% 8.42 8.40 20.00
199 7+860 7+880 TIPO 1 -0.520% 8.42 8.40 20.00
200 7+880 7+900 TIPO 1 -0.520% 8.42 8.40 20.00
201 7+900 7+920 TIPO 1 -0.520% 8.42 8.40 20.00
202 7+920 7+940 TIPO 1 -0.520% 8.42 8.40 20.00
203 7+940 7+960 TIPO 1 -0.520% 8.42 8.40 20.00
204 7+960 7+980 TIPO 1 -0.520% 8.42 8.40 20.00
205 7+980 8+000 TIPO 1 -0.520% 8.42 8.40 20.00
206 8+000 8+020 TIPO 1 -0.520% 8.42 8.40 20.00
207 8+020 8+040 TIPO 1 -0.520% 8.42 8.40 20.00
208 8+040 8+060 TIPO 1 -0.520% 8.42 8.40 20.00
209 8+060 8+080 TIPO 1 -0.260% 8.42 8.40 20.00
210 8+080 8+100 TIPO 1 -0.260% 8.42 8.40 20.00
211 8+100 8+120 TIPO 1 -0.260% 8.42 8.40 20.00
212 8+120 8+140 TIPO 1 -0.260% 8.42 8.40 20.00
213 8+140 8+160 TIPO 1 -0.260% 8.42 8.40 20.00
214 8+160 8+180 TIPO 1 -0.260% 8.42 8.40 20.00
215 8+180 8+200 TIPO 1 -0.260% 8.42 8.40 20.00
216 8+200 8+220 TIPO 1 -0.350% 8.42 8.40 20.00
217 8+220 8+240 TIPO 1 -0.350% 8.42 8.40 20.00
218 8+240 8+260 TIPO 1 -0.350% 8.42 8.40 20.00
219 8+260 8+280 TIPO 1 -0.350% 8.42 8.40 20.00
220 8+280 8+300 TIPO 1 1.680% 8.42 8.40 20.00
221 8+300 8+320 TIPO 1 1.680% 8.35 8.40 20.00
222 8+320 8+340 TIPO 1 1.680% 8.35 8.40 20.00
223 8+340 8+360 TIPO 1 1.680% 8.35 8.40 20.00
224 8+360 8+380 TIPO 1 0.080% 8.25 8.40 20.00
225 8+380 8+400 TIPO 1 0.080% 8.25 8.40 20.00
226 8+400 8+410 TIPO 1 0.080% 8.00 8.00 10.00
227 8+410 8+420 PUENTE 0.080% 7.90 0.00 10.00
228 8+420 8+440 PUENTE 0.080% 7.90 0.00 20.00
229 8+440 8+460 PUENTE 0.080% 7.90 0.00 20.00
230 8+460 8+480 PUENTE -0.020% 7.90 0.00 20.00
231 8+480 8+500 PUENTE -0.020% 7.90 0.00 20.00
232 8+500 8+510 PUENTE -0.020% 7.90 0.00 10.00
233 8+510 8+520 TIPO 1 -0.020% 7.80 8.00 10.00
234 8+520 8+530 TIPO 1 -0.020% 7.76 8.00 10.00
235 8+530 8+540 TIPO 1 -0.020% 7.79 8.00 10.00
236 8+540 8+550 TIPO 1 -0.020% 7.75 8.00 10.00
237 8+550 8+560 TIPO 1 -0.020% 7.78 8.00 10.00
238 8+560 8+570 TIPO 1 -0.020% 7.96 8.00 10.00
239 8+570 8+580 TIPO 1 -2.290% 8.50 8.50 10.00
240 8+580 8+590 TIPO 1 -2.290% 9.12 9.00 10.00
241 8+590 8+600 TIPO 1 -2.290% 9.11 9.00 10.00
ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL
CONTRATISTA: CONSORCIO SURVIAL PERUANO
CONTRATISTAS INGENIEROS ASOCIADOS SAC
OBRA: Carretera EMP. PE 1S (El Fiscal) – Ventillata – Cocachacra – EMP. PE 1SD (Punta de Bombón)

ANCHO DE SUPERFICE RECAPEADA (ASFALTADA)

TRAMO I: EMP. PE 1S (EL FISCAL) - VENTILLATA - COCACHACRA (KM. 0+000 AL 11+600)

PROGRESIVA ANCHO EFECTIVO


TIPO DE PENDIENTE DE ANCHO SUPERFICIE
ITEM SUPERFICIE LARGO
TERRENO PERFIL (%) ASFALTADA
INICIO FINAL ASFALTADA

242 8+600 8+610 TIPO 1 -2.290% 9.12 9.00 10.00


243 8+610 8+620 TIPO 1 -2.290% 9.18 9.00 10.00
244 8+620 8+630 TIPO 1 -2.290% 9.22 9.00 10.00
245 8+630 8+640 TIPO 1 -2.290% 9.25 9.20 10.00
246 8+640 8+650 TIPO 1 -2.290% 9.23 9.20 10.00
247 8+650 8+660 TIPO 1 -2.290% 9.20 9.20 10.00
248 8+660 8+670 TIPO 1 -2.290% 9.22 9.20 10.00
249 8+670 8+680 TIPO 1 -2.290% 9.25 9.20 10.00
250 8+680 8+690 TIPO 1 -2.290% 9.24 9.20 10.00
251 8+690 8+700 TIPO 1 -0.950% 9.20 9.20 10.00
252 8+700 8+710 TIPO 1 -0.950% 9.02 9.00 10.00
253 8+710 8+720 TIPO 1 -0.950% 8.91 9.00 10.00
254 8+720 8+730 TIPO 1 -0.950% 8.80 8.80 10.00
255 8+730 8+740 TIPO 1 -0.950% 8.70 8.80 10.00
256 8+740 8+750 TIPO 1 -0.950% 8.72 8.80 10.00
257 8+750 8+760 TIPO 1 -0.950% 8.80 8.80 10.00
258 8+760 8+770 TIPO 1 -0.950% 8.84 8.80 10.00
259 8+770 8+780 TIPO 1 -0.950% 8.84 8.80 10.00
260 8+780 8+790 TIPO 1 -0.950% 8.88 8.80 10.00
261 8+790 8+800 TIPO 1 -0.950% 8.82 8.80 10.00
262 8+800 8+810 TIPO 1 -0.950% 8.81 8.80 10.00
263 8+810 8+820 TIPO 1 -0.950% 8.83 8.80 10.00
264 8+820 8+830 TIPO 1 -0.950% 8.76 8.80 10.00
265 8+830 8+840 TIPO 1 -0.880% 8.60 8.60 10.00
266 8+840 8+850 TIPO 1 -0.880% 8.40 8.40 10.00
267 8+850 8+860 TIPO 1 -0.880% 8.43 8.40 10.00
268 8+860 8+880 TIPO 1 -0.880% 8.41 8.40 20.00
269 8+880 8+900 TIPO 1 -0.880% 8.47 8.40 20.00
270 8+900 8+920 TIPO 1 -0.880% 8.47 8.40 20.00
271 8+920 8+940 TIPO 1 -0.880% 8.47 8.40 20.00
272 8+940 8+960 TIPO 1 -0.880% 8.47 8.40 20.00
273 8+960 8+980 TIPO 1 -0.880% 8.47 8.40 20.00
274 8+980 9+000 TIPO 1 -0.880% 8.47 8.40 20.00
275 9+000 9+020 TIPO 1 -0.620% 8.45 8.40 20.00
276 9+020 9+040 TIPO 1 -0.620% 8.45 8.40 20.00
277 9+040 9+060 TIPO 1 -0.620% 8.45 8.40 20.00
278 9+060 9+080 TIPO 1 -0.620% 8.45 8.40 20.00
279 9+080 9+100 TIPO 1 -0.620% 8.45 8.40 20.00
280 9+100 9+120 TIPO 2 -0.620% 8.45 8.40 20.00
281 9+120 9+140 TIPO 3 -0.620% 8.45 8.40 20.00
282 9+140 9+160 TIPO 4 -0.620% 8.45 8.40 20.00
283 9+160 9+180 TIPO 5 -0.620% 8.45 8.40 20.00
284 9+180 9+200 TIPO 6 -0.620% 8.45 8.40 20.00
285 9+200 9+220 TIPO 7 -0.620% 8.45 8.40 20.00
286 9+220 9+240 TIPO 8 -0.620% 8.45 8.40 20.00
287 9+240 9+260 TIPO 9 -0.620% 8.45 8.40 20.00
288 9+260 9+280 TIPO 10 -0.620% 8.45 8.40 20.00
289 9+280 9+300 TIPO 11 -0.620% 8.45 8.40 20.00
290 9+300 9+320 TIPO 12 -0.620% 8.45 8.40 20.00
291 9+320 9+340 TIPO 1 -0.620% 8.45 8.40 20.00
292 9+340 9+360 TIPO 1 -0.620% 8.45 8.40 20.00
293 9+360 9+380 TIPO 1 -0.620% 8.45 8.40 20.00
ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL
CONTRATISTA: CONSORCIO SURVIAL PERUANO
CONTRATISTAS INGENIEROS ASOCIADOS SAC
OBRA: Carretera EMP. PE 1S (El Fiscal) – Ventillata – Cocachacra – EMP. PE 1SD (Punta de Bombón)

ANCHO DE SUPERFICE RECAPEADA (ASFALTADA)

TRAMO I: EMP. PE 1S (EL FISCAL) - VENTILLATA - COCACHACRA (KM. 0+000 AL 11+600)

PROGRESIVA ANCHO EFECTIVO


TIPO DE PENDIENTE DE ANCHO SUPERFICIE
ITEM SUPERFICIE LARGO
TERRENO PERFIL (%) ASFALTADA
INICIO FINAL ASFALTADA

294 9+380 9+400 TIPO 1 -0.620% 8.45 8.40 20.00


295 9+400 9+420 TIPO 1 -0.620% 8.45 8.40 20.00
296 9+420 9+440 TIPO 1 -0.430% 8.45 8.40 20.00
297 9+440 9+460 TIPO 1 -0.430% 8.45 8.40 20.00
298 9+460 9+480 TIPO 1 -0.430% 8.45 8.40 20.00
299 9+480 9+500 TIPO 1 -0.430% 8.45 8.40 20.00
300 9+500 9+520 TIPO 1 -0.430% 8.45 8.40 20.00
301 9+520 9+540 TIPO 1 -0.430% 8.45 8.40 20.00
302 9+540 9+560 TIPO 1 -0.430% 8.45 8.40 20.00
303 9+560 9+580 TIPO 1 -0.430% 8.45 8.40 20.00
304 9+580 9+600 TIPO 1 -0.430% 8.45 8.40 20.00
305 9+600 9+620 TIPO 1 -0.430% 8.45 8.40 20.00
306 9+620 9+640 TIPO 1 -0.970% 8.45 8.40 20.00
307 9+640 9+660 TIPO 1 -0.970% 8.45 8.40 20.00
308 9+660 9+680 TIPO 1 -0.970% 8.45 8.40 20.00
309 9+680 9+700 TIPO 1 -0.970% 8.45 8.40 20.00
310 9+700 9+720 TIPO 1 -0.970% 8.45 8.40 20.00
311 9+720 9+740 TIPO 1 -0.970% 8.45 8.40 20.00
312 9+740 9+760 TIPO 1 -0.970% 8.45 8.40 20.00
313 9+760 9+780 TIPO 1 -0.830% 8.45 8.40 20.00
314 9+780 9+800 TIPO 1 -0.830% 8.45 8.40 20.00
315 9+800 9+820 TIPO 1 -0.830% 8.45 8.40 20.00
316 9+820 9+840 TIPO 1 -0.830% 8.45 8.40 20.00
317 9+840 9+860 TIPO 1 -0.830% 8.45 8.40 20.00
318 9+860 9+880 TIPO 1 -0.830% 8.45 8.40 20.00
319 9+880 9+900 TIPO 1 -0.830% 8.45 8.40 20.00
320 9+900 9+920 TIPO 1 -0.830% 8.45 8.40 20.00
321 9+920 9+940 TIPO 1 -0.830% 8.45 8.40 20.00
322 9+940 9+960 TIPO 1 -0.830% 8.45 8.40 20.00
323 9+960 9+980 TIPO 1 -0.830% 8.45 8.40 20.00
324 9+980 10+000 TIPO 1 -0.830% 8.45 8.40 20.00
325 10+000 10+020 TIPO 1 -0.830% 8.50 8.60 20.00
326 10+020 10+040 TIPO 1 -0.830% 8.50 8.60 20.00
327 10+040 10+060 TIPO 1 -0.740% 8.50 8.60 20.00
328 10+060 10+080 TIPO 1 -0.740% 8.50 8.60 20.00
329 10+080 10+100 TIPO 1 -0.740% 8.50 8.60 20.00
330 10+100 10+120 TIPO 1 -0.740% 8.50 8.60 20.00
331 10+120 10+140 TIPO 1 -0.740% 8.50 8.60 20.00
332 10+140 10+160 TIPO 1 -0.740% 8.60 8.60 20.00
333 10+160 10+180 TIPO 1 -0.740% 8.60 8.60 20.00
334 10+180 10+200 TIPO 1 -0.740% 8.60 8.60 20.00
335 10+200 10+220 TIPO 1 -0.740% 8.60 8.60 20.00
336 10+220 10+240 TIPO 1 -0.740% 8.60 8.60 20.00
337 10+240 10+260 TIPO 1 -0.740% 8.60 8.60 20.00
338 10+260 10+280 TIPO 1 -0.740% 8.60 8.60 20.00
339 10+280 10+300 TIPO 1 -0.740% 8.60 8.60 20.00
340 10+300 10+320 TIPO 1 -0.740% 8.48 8.60 20.00
341 10+320 10+340 TIPO 1 -0.740% 8.48 8.60 20.00
ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL
CONTRATISTA: CONSORCIO SURVIAL PERUANO
CONTRATISTAS INGENIEROS ASOCIADOS SAC
OBRA: Carretera EMP. PE 1S (El Fiscal) – Ventillata – Cocachacra – EMP. PE 1SD (Punta de Bombón)

ANCHO DE SUPERFICE RECAPEADA (ASFALTADA)

TRAMO I: EMP. PE 1S (EL FISCAL) - VENTILLATA - COCACHACRA (KM. 0+000 AL 11+600)

PROGRESIVA ANCHO EFECTIVO


TIPO DE PENDIENTE DE ANCHO SUPERFICIE
ITEM SUPERFICIE LARGO
TERRENO PERFIL (%) ASFALTADA
INICIO FINAL ASFALTADA

342 10+340 10+360 TIPO 1 -0.740% 8.48 8.60 20.00


343 10+360 10+380 TIPO 1 -0.740% 8.48 8.60 20.00
344 10+380 10+400 TIPO 1 -0.740% 8.48 8.60 20.00
345 10+400 10+420 TIPO 1 -0.740% 8.48 8.60 20.00
346 10+420 10+440 TIPO 1 -0.740% 8.48 8.60 20.00
347 10+440 10+460 TIPO 1 -0.740% 8.48 8.60 20.00
348 10+460 10+480 TIPO 1 -0.740% 8.48 8.60 20.00
349 10+480 10+500 TIPO 1 -0.740% 8.48 8.60 20.00
350 10+500 10+520 TIPO 1 -0.740% 8.48 8.60 20.00
351 10+520 10+540 TIPO 1 -0.740% 8.48 8.60 20.00
352 10+540 10+560 TIPO 1 -0.860% 8.48 8.60 20.00
353 10+560 10+580 TIPO 1 -0.860% 8.48 8.60 20.00
354 10+580 10+600 TIPO 1 -0.860% 8.48 8.60 20.00
355 10+600 10+620 TIPO 1 -0.860% 8.48 8.60 20.00
356 10+620 10+640 TIPO 1 -0.860% 8.48 8.60 20.00
357 10+640 10+660 TIPO 1 -0.860% 8.48 8.60 20.00
358 10+660 10+680 TIPO 1 -0.860% 8.48 8.60 20.00
359 10+680 10+700 TIPO 1 -0.860% 8.48 8.60 20.00
360 10+700 10+720 TIPO 1 -0.860% 8.48 8.60 20.00
361 10+720 10+740 TIPO 1 -0.860% 8.45 8.60 20.00
362 10+740 10+760 TIPO 1 -0.740% 8.45 8.60 20.00
363 10+760 10+780 TIPO 1 -0.740% 8.45 8.60 20.00
364 10+780 10+800 TIPO 1 -0.740% 8.45 8.60 20.00
365 10+800 10+820 TIPO 1 -0.740% 8.45 8.60 20.00
366 10+820 10+840 TIPO 1 -0.740% 8.45 8.60 20.00
367 10+840 10+860 TIPO 1 -0.740% 8.45 8.60 20.00
368 10+860 10+880 TIPO 1 -0.740% 8.45 8.60 20.00
369 10+880 10+900 TIPO 1 -0.740% 8.45 8.60 20.00
370 10+900 10+920 TIPO 1 -1.110% 8.45 8.60 20.00
371 10+920 10+940 TIPO 1 -1.110% 8.45 8.60 20.00
372 10+940 10+960 TIPO 1 -1.110% 8.45 8.60 20.00
373 10+960 10+980 TIPO 1 -1.110% 8.57 8.60 20.00
374 10+980 11+000 TIPO 1 -1.110% 8.57 8.60 20.00
375 11+000 11+020 TIPO 1 -1.110% 8.57 8.60 20.00
376 11+020 11+040 TIPO 1 -1.110% 8.57 8.60 20.00
377 11+040 11+060 TIPO 1 -1.110% 8.57 8.60 20.00
378 11+060 11+080 TIPO 1 -1.110% 8.57 8.60 20.00
379 11+080 11+100 TIPO 1 -1.110% 8.57 8.60 20.00
380 11+100 11+120 TIPO 1 -1.110% 8.55 8.60 20.00
381 11+120 11+140 TIPO 1 -1.110% 8.55 8.60 20.00
382 11+140 11+160 TIPO 1 -1.110% 8.55 8.60 20.00
383 11+160 11+180 TIPO 1 -1.110% 8.55 8.60 20.00
384 11+180 11+200 TIPO 1 -1.110% 8.55 8.60 20.00
385 11+200 11+220 TIPO 1 -0.990% 8.55 8.60 20.00
386 11+220 11+240 TIPO 1 -0.990% 8.55 8.60 20.00
387 11+240 11+260 TIPO 1 -0.990% 8.55 8.60 20.00
388 11+260 11+280 TIPO 1 -0.990% 8.55 8.60 20.00
389 11+280 11+300 TIPO 1 -0.990% 8.55 8.60 20.00
390 11+300 11+320 TIPO 1 -0.990% 8.55 8.60 20.00
391 11+320 11+340 TIPO 1 -0.990% 8.55 8.60 20.00
392 11+340 11+360 TIPO 1 -0.990% 8.55 8.60 20.00
ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL
CONTRATISTA: CONSORCIO SURVIAL PERUANO
CONTRATISTAS INGENIEROS ASOCIADOS SAC
OBRA: Carretera EMP. PE 1S (El Fiscal) – Ventillata – Cocachacra – EMP. PE 1SD (Punta de Bombón)

ANCHO DE SUPERFICE RECAPEADA (ASFALTADA)

TRAMO I: EMP. PE 1S (EL FISCAL) - VENTILLATA - COCACHACRA (KM. 0+000 AL 11+600)

PROGRESIVA ANCHO EFECTIVO


TIPO DE PENDIENTE DE ANCHO SUPERFICIE
ITEM SUPERFICIE LARGO
TERRENO PERFIL (%) ASFALTADA
INICIO FINAL ASFALTADA

393 11+360 11+380 TIPO 1 -0.990% 8.55 8.60 20.00


394 11+380 11+400 TIPO 1 -0.990% 8.55 8.60 20.00
395 11+400 11+420 TIPO 1 -0.990% 8.55 8.60 20.00
396 11+420 11+440 TIPO 1 -0.480% 8.55 8.60 20.00
397 11+440 11+460 TIPO 1 -0.480% 8.55 8.60 20.00
398 11+460 11+480 TIPO 1 -0.480% 8.55 8.60 20.00
399 11+480 11+500 TIPO 1 -0.480% 8.55 8.60 20.00
400 11+500 11+520 TIPO 1 -0.480% 8.55 8.60 20.00
401 11+520 11+540 TIPO 1 -0.480% 8.55 8.60 20.00
402 11+540 11+560 TIPO 1 -0.480% 8.55 8.60 20.00
403 11+560 11+580 TIPO 1 -0.380% 8.55 8.60 20.00
404 11+580 11+600 TIPO 1 -0.380% 8.55 8.60 20.00

SUB TOTAL (m²): 56,711.00