PROYECTO: CONSTRUCCION DE DEPARTAENTOS PJ.

LEONCIO PRADO, CALLE SAN MARCOS N°° 328,TACNA


APARTAMENTO B

ACERO EN VIGA
DETALLE ACERO ESPACIADO
LONGITUDINA
C L TOTAL

A Nº
DESCRIPCIÓN LONG. VIGA ESTRIBOS
N S1 S2 S3 S4 RESTO RESTO ESTRIB
T. ML N° var OS

V1 (25X35) EJE 3-3,.4-4, Y 5 -5 ENTRE EYG (1/2") 3 5.18 5.36 3


V1 (25X35) EJE 3-3,.4-4, Y 5 -5 ENTRE EYG (5/8") 3 5.18 7.02 3
ESTRIBOS EJE 3-3,.4-4, Y 5 -5 ENTRE EYG (1/4") 3 4.48 0.15 0.10 0.25 10.1 24
V2 (.25X.30) EJE 6-6 ENTRE DYG (1/2") 1 5.18 7.19 3
V2 (.25X.30) EJE 6-6 ENTRE DYG (1/2") 1 5.18 5.14 3
ESTRIBOS EJE 6-6 ENTRE DYG (1/4") 1 4.49 0.15 0.10 0.25 12.16 22
VA (25X20) EJE D-D ENTRE 2,3Y4 (1/2") 1 4.95 10.04 2
VA (25X20) EJE D-D ENTRE 5Y6 (1/2") 1 4.00 8.22 2
VA (25X20) EJE G-G ENTRE 1,2,3,4,5 Y6 (1/2") 1 14.75 38.62 2
ESTRIBOS EJE 1-1 ENTRE EYG(1/4") 1 3.43 0.15 0.10 0.25 9.1 17
ESTRIBOS EJE G-G ENTRE 1Y2 (1/4") 1 3.60 0.15 0.10 0.25 9.8 18
ESTRIBOS EJE G-G Y D-D ENTRE 2Y3 (1/4") 2 2.20 0.15 0.10 0.25 4.2 12
ESTRIBOS EJE G-G Y D-D ENTRE 3Y4 (1/4") 2 2.10 0.15 0.10 0.25 3.8 12
ESTRIBOS EJE G-G ENTRE 4 Y5 (1/4") 1 2.25 0.15 0.10 0.25 4.4 12
ESTRIBOS EJE D-D ENTRE 5Y6 (1/4") 1 3.49 0.15 0.10 0.25 9.36 17
ESTRIBOS EJE G-G ENTRE 5Y6 (1/4") 1 3.11 0.15 0.10 0.25 7.84 16
Vb (15x.20) EJE F-F ENTRE 4Y5 (1/2") 2 2.75 2.97 2.00
ESTRIBOS EJE F-F ENTRE 4Y5 (1/4") 2 2.75 0.20 12.75 21
VOLADO Vb (15x.20) EJE F-F ENTRE FYG (1/2") 1 4.73 9.89 2.00
ESTRIBOS VOLADO EJE F-F ENTRE FYG (1/4") 1 4.73 0.20 22.67 31
VCH (25X20) EJE E-E, ENTRE 1Y2 (1/2") 1 4.10 4.42 2
VCH (25X20) EJE E-E, ENTRE 1Y2 (1/2") 1 4.10 4.42 3
VCH (25X20) EJE 2-2, ENTRE D-G (1/2") 1 5.08 7.44 2
VCH (25X20) EJE 2-2, ENTRE D-G (1/2") 1 5.08 5.04 3
ESTRIBOS EJE E-E, ENTRE 1Y2 (1/4") 1 3.43 0.15 0.10 0.20 11.625 20
ESTRIBOS EJE 2-2, ENTRE D-E (1/4") 1 1.15 0.15 0.10 0.20 1.75 7
ESTRIBOS EJE 2-2, ENTRE EYG (1/4") 1 3.43 0.15 0.10 0.20 11.625 20
#REF!

PESO PARCIAL (KG)


LONG. Ø 1/4 3/8 1/2 5/8 3/4 1 PESO
DE Peso TOTAL
ESTRIB Unit. (KG)
O (ML) (Kg/Ml 0.25 0.56 0.99 1.55 2.24 3.98
)

47.86 47.86
98.05 98.05
1.03 18.39 18.39
21.42 21.42
23.95 23.95
0.93 5.07 5.07
19.94 19.94
16.32 16.32
76.70 76.70
0.73 3.08 3.08
0.73 3.26 3.26
0.73 2.17 2.17
0.73 2.17 2.17
0.73 2.17 2.17
0.73 3.08 3.08
0.73 2.90 2.90
9.22 9.22
0.50 2.60 2.60
19.63 19.63
0.50 3.84 3.84
13.73 13.73
13.17 13.17
14.77 14.77
15.00 15.00
0.73 3.62 3.62
0.73 1.27 1.27
0.73 3.62 3.62
447.01
RESUMEN DE PLANILLA DE METRADOS
PROYECTO:MEJORAMIENTO DE LA I.E.I.N°443-SANTA TERESITA

ITEM DESCRIPCIÓN DE LA PARTIDA


01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE OBRA
01.02. CERCO PROVICIONAL DE ESTERA
01.03. ALMACEN DE MATERIALES DE OBRA
01.04 INSTALACIONES SANITARIAS PROVICIONAL
01.05 INSTALACIONES ELECTRICAS PROVICIONAL
02 TRABAJOS PRELIMINARES
02.01 MOVILIZACION DE HERRAMIENTAS Y EQUIPO
02.02 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA
02.03 ELIMINACIN DE MATERIAL EXEDENTE
02.04 LIMPIEZA DE TERRENO MANUAL
02 ESTRUCTURAS
02.01 MOVIMIENTOS DE TIERRAS
02.01.01 NIVELACIÓN DE TERRENO
02.01.01.01 NIVELACIÓN, TRAZO Y REPLANTEO
02.01.02 EXCAVACIONES
02.01.02.01 EXCAVACIONES SIMPLES
02.01.02.01. EXCAVACIONES PARA ZAPATAS
01.01.02.01. EXCAVACIONES PARA CIMIENTOS CORRIDOS
02.01.03 TRABAJOS DE CORTE Y RELLENO
02.01.03.01 CORTE GENERAL DE LA OBRA
02.01.03.02 RELLENO
02.01.03.02. RELLENO GENERAL DE LA OBRA
02.01.04 ELIMINACIÓN DE MATERIAL EXCEDENTE
02.02 OBRAS DE CONCRETO SIMPLE
02.02.01 SOLADO
02.02.02 CIMIENTOS CORRIDOS
02.02.02.01 CONCRETO EN CIMIENTO CORRIDO F"C=100 Kg/cm+30%de P.G. max. 8"
02.02.02.02 ENCOFRADO Y DESENCOFRADO EN CIMIENTOS CORRIDOS
02.02.03 SOBRECIMIENTOS
02.02.03.01 CONCRETO EN CIMIENTO CORRIDO F"C=140Kg/cmc:h 1:8+25%de P.M.
02.02.03.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS
02.03 OBRAS DE CONCRETO ARMADO
02.03.01 ZAPATAS
02.03.01.01 CONCRET EN ZAPATAS
02.03.01.02 ENCOFRADO Y DESENCOFRADO EN ZAPATA
02.03.01.03 ARMADURA DE ACERO EN ZAPATAS
02.03.02 COLUMNAS
02.03.02.01 CONCRETO EN COLUMNAS F"C=140KG/CM2
02.03.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS
02.03.02.03 ARMADURA DE ACERO EN COLUMNAS
02.03.02.04 ACERO DE ANCLAJE
02.03.03 VIGAS
02.03.03.01 CONCRETO EN VIGAS
02.03.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS
02.03.03.03 ARMADURA DE ACERO EN VIGAS
02.03.04 LOSAS
02.03.04.01 LOSA ALIGERADA
02.03.04.01. CONCRETO EN LOSA ALIGERADA
02.03.04.01. ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA
02.03.04.01. ARMADURA DE ACERO EN LOSA ALIGERADA
02.03.04.01. LADRILLO EN LOSA ALIGERADA
03.07 RAMPA
CONCRETO EN RAMPA

ITEM DESCRIPCIÓN
04 INSTALACIONES ELÉCTRICAS Y MECANICAS
04.01 SALIDA
04.01.01 SALIDA PARA TOMACORRIENTE
04.01.02 SALIDA PARA ALUMBRADO
04.01.03 SALIDA PARA INTERRUPTOR
04.03 CANALIZADORES, CONDUCTOS O TUBERIAS
04.04 CONDUCTORES Y CABLES DE ENERGÍA EN TUBERÍAS
04.05 TABLEROS PRINCIPALES
04.06 TABLEROS DE DISTRIBUCIÓN
04.07 DISPOSITIVOS DE MANIOBRA Y PROTECCIÓN
04.08. ARTEFACTOS
05 INSTALACIONES DE COMUNICACIONES
05.01 CABLEADO
05.02 CANALIZADORES
05.03 SALIDA DE COMUNICACIONES
ADOS

UNIDAD METRADOPRECIO S/. PARCIAL

und 1 963.76 963.76


ML 162.26 23.92 3881.2592
m2 85 84.23 7159.55
est. 1 1330.19 1330.19
est. 1 712.39 712.39

2 258.09 516.18
2 294.86 589.72
162.56 2.48 403.1488
162.56 0.49 79.6544

m2 239.49 2.22 531.6678


0
0
m3 97.49 119.68 11667.6032
m3 67.54 223.32 15083.0328
0
m3 24.00 0
0
m3 60.32 0
m3 119.50 2.48 296.36

m2 63.58 25.45 1618.111


0
m3 67.34 104.51 7037.7034
m2 246.31 56.60 13941.146
0
m3 10.27 353.41 3629.5207
m2 139.92 56.60 7919.472
0
0
m3 25.19 391.64 9865.4116
m2 81.12 104.51 8477.8512
kg 1,197.59 7.44 8910.0696
0
m3 11.16 392.24 4377.3984
m2 403.22 56.60 22822.252
kg 2,970.79 8.85 26291.4915
kg 195.72 0
0
m3 33.88 392.24 13289.0912
m2 323.05 201.30 65029.965
kg 2,028.69 8.75 17751.0375
0
0
m3 45.75 257.36 11774.22
m2 373.41 41.40 15459.174
kg 1,022.09 6.05 6183.6445
und 2,907.63 2.41 7007.3883
0
26.54 315.04 8361.1616
TOTAL 302960.626

Und. METADO PRECIO S/. PARCIAL

pto 56 18.33 1026.48


pto 38 19.54 742.52
pto 24 41.37 992.88
m 318.89 7.22 2302.3858
m 1045.57 5.91 6179.3187
unid 1 535.48 535.48
unid 4 910.39 3641.56
0
unid. 113 0

m 149.07 0
m 149.07 7.22 1076.2854
pto 11
TOTAL 16496.9099
PLANILLA DE METRADOS

PROYECTO:

ITEM
02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
02.01.02.01.01
02.01.02.01.02
02.01.03
02.01.03.01
02.01.03.02
02.01.03.02.01
02.01.03.02.02
02.01.03.02.03
02.01.04
02.01.05
02.02
02.02.01
02.02.02
02.02.02.01
02.02.02.02
02.02.03
02.02.03.01
02.02.03.02
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.01.03
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.01.01
02.03.05.01.02
02.03.05.01.03
02.03.05.01.04

ITEM
05
05.01
05.01.01
05.01.02
05.01.02
05.03
05.01
05.02
05.03
05.04
05.05
05.06
PLANILLA DE METRADOS

MEJORAMIENTO DEL SERVICIO DE EDUCACIÓN INICIAL DE LA I.E.I N° 443 SANTA TERESITA EN LA ASOCIACION DE VI
PROTER SAMA, DISTRITO DE INCLAN - TACNA - TACNA
MODULO N° 01

DESCRIPCIÓN DE LA PARTIDA
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
NIVELACIÓN DE TERRENO
NIVELACIÓN
EXCAVACIONES
EXCAVACIONES SIMPLES
EXCAVACIÓN PARA ZAPATAS
EXCAVACIONES CON CIMIENTO CORRIDO
TRABAJOS Y CORTE DE RELLENO
CORTE GENERAL DE OBRA
RELLENO
RELLENO GENERAL DE LA OBRA

RELLENO EN CIMIENTOS CORRIDOS


ELIMINACIÓN DE MATERIAL EXCEDENTE
ADQUISICIÓN DE MATERIAL DE PRÉSTAMO PARA OBRA
OBRAS DE CONCRETO SIMPLE
SOLADOS
CIMIENTOS CORRIDOS
CONCRETO EN CIMIENTOS CORRIDOS F'C=100KG/CM2, C:H 1:10 +30%P.G.
ENCOFRADO Y DESENCOFRADO EN CIMIENTOS CORRIDOS
SOBRECIMIENTOS
CONCRETO EN SOBRECIMIENTOS F'C=140KG/CM2, C:H 1:8+30%P.M.
ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS
ENCOFRADO Y DESENCOFRADO EN ZAPATAS
ARMADURA DE ACERO EN ZAPATAS
COLUMNAS
CONCRETO EN COLUMNAS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
ARMADURA DE ACERO EN COLUMNAS
VIGAS
CONCRETO EN VIGAS
ENCOFRADO Y DESENCOFRADO EN VIGAS
ARMADURA DE ACERO EN VIGAS
LOSAS
LOSA ALIGERADA
CONCRETO EN LOSA ALIGERADA
ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA
ARMADURA DE ACERO EN LOSA ALIGERADA
LADRILLO EN LOSA ALIGERADA

DESCRIPCIÓN
INSTALACIONES ELÉCTRICAS Y MECANICAS
SALIDA
SALIDA PARA TOMACORRIENTE
SALIDA PARA ALUMBRADO
SALIDA PARA INTERRUPTOR
CANALIZADORES, CONDUCTOS O TUBERIAS
CANALIZACIÓN, CONDUCTORES Y TUBERÍAS
CONDUCTORES Y CABLES DE ENERGÍA EN TUBERÍAS
TABLEROS PRINCIPALES
TABLEROS DE DISTRIBUCIÓN
4
ARTEFACTOS
A EN LA ASOCIACION DE VIVIENDA

UNIDAD TOTAL

m2 40.00

m3 48.26
m3 26.18

m3 12.00
m3 42.00
m3
m3 25.20
m3 4.63
m3 55.03
24.60

m2 30.16

m3 33.66
m2 119.67

m3 3.89
m2 54.85

m3 12.06
m2 33.12
kg 480.71

m3 51.11
m2 133.44
kg 208.72
m3 325.00
m2 40.38
kg 447.01

m3 30.85
m2 178.57
kg 218.14
und 1487.92

Und. TOTAL

pto 15
pto 28
pto 10
m
m 189.83
m 496.66
unid
unid 2.00
2.00
unid. 53.00
PLANILLA DE METRADO

PROYECTO:

ITEM
02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
02.01.02.01.01

02.01.02.01.02

02.01.03
02.01.03.01
02.01.03.02
02.01.03.02.01
02.01.03.02.02
02.01.03.02.03
02.01.04

02.01.05
02.02
02.02.01

02.02.02
02.02.02.01

02.02.02.02
02.02.03
02.02.03.01
02.02.03.02

02.03
02.03.01
02.03.01.01

02.03.01.02

02.03.01.03
02.03.03
02.03.03.01

02.03.03.02

02.03.03.03

02.03.04
02.03.04.01
02.03.04.02

02.03.04.03
02.03.05.01.02
02.03.05.01.03

02.03.05.01.04
PLANILLA DE METRADOS

ONSTRUCCION DE DEPARTAENTOS PJ. LEONCIO PRADO, CALLE SAN MARCOS N°° 328,TACNA

APARTAMENTO B

DESCRIPCIÓN DE LA PARTIDA UNIDAD


ESTRUCTURAS
MOVIMIENTO DE TIERRAS
NIVELACIÓN DE TERRENO
NIVELACIÓN m2
EXCAVACIONES
EXCAVACIONES SIMPLES
EXCAVACIÓN PARA ZAPATAS m3
Z-1
Z-2
Z-3
Z-2 A
Z-3A
EXCAVACIONES CON CIMIENTO CORRIDO m3
EJE X
EJE D ENTRE EJE 2 ,3,4,5Y6
EJE E ENTRE EJE 2 Y3
EJE E' ENTRE EJE 4 Y5
EJE F ENTRE EJE 5 Y6
EJE G ENTRE EJE 2 ,3,4,5Y6
EJE Y
EJE 1-1 ENTRE EJE GY E
EJE 2-2 ENTRE EJE DY E
EJE 3-3 ENTRE EJE DY G
EJE 4-4 ENTRE EJE DY G
EJE 5-5 ENTRE EJE DY G
EJE 6-6 ENTRE EJE DY G
TRABAJOS Y CORTE DE RELLENO
CORTE GENERAL DE OBRA m3
RELLENO m3
RELLENO GENERAL DE LA OBRA m3
RELLENO EN ZAPATAS m3
Z-1, EN EL EJE 1-1 Y C-C
Z-1, EN EL EJE 7-7 Y C-C

Z-1, EN EL EJE 1-1 Y A-A

Z-1, EN EL EJE 7-7 Y A-A

Z-2, EN EL EJE 1-1 Y B-B

Z-3, EN EL EJE 2-2 Y C-C

Z-3, EN EL EJE 3-3 Y C-C

Z-3, EN EL EJE 4-4 Y C-C

Z-3, EN EL EJE 5-5 Y C-C

Z-3, EN EL EJE 6-6 Y C-C

Z-3-A, EN EL EJE 2-2 Y C-C

Z-3-A, EN EL EJE 3-3 Y C-C

Z-3-A, EN EL EJE 4-4 Y C-C

Z-3-A, EN EL EJE 5-5 Y C-C

Z-3-A, EN EL EJE 6-6 Y C-C

RELLENO EN CIMIENTOS CORRIDOS m3


EJE X
EJE C-C ENTRE EJE 1-1 Y EJE 2-2
EJE C-C ENTRE EJE 2-2 Y EJE 3-3
EJE C-C ENTRE EJE 3-3 Y EJE 4-4
EJE C-C ENTRE EJE 4-4 Y EJE 5-5
EJE C-C ENTRE EJE 5-5 Y EJE 6-6
EJE C-C ENTRE EJE 6-6 Y EJE 7-7
EJE C-C ENTRE EJE 7-7 Y EJE 8-8
EJE B-B ENTRE EJE 7-7 Y EJE 8-8
EJE A-A ENTRE EJE 1-1 Y EJE 2-2
EJE A-A ENTRE EJE 2-2 Y EJE 3-3
EJE A-A ENTRE EJE 3-3 Y EJE 4-4
EJE A-A ENTRE EJE 4-4 Y EJE 5-5
EJE A-A ENTRE EJE 5-5 Y EJE 6-6
EJE A-A ENTRE EJE 6-6 Y EJE 7-7
EJE Y
EJE 1-1 ENTRE EJE C-C Y EJE B-B
EJE 1-1 ENTRE EJE B-B Y EJE A-A
EJE 3-3 ENTRE EJE C-C Y EJE A-A
EJE 5-5 ENTRE EJE C-C Y EJE A-A
EJE 7-7 ENTRE EJE C-C Y EJE A-A
EJE 8-8 ENTRE EJE C-C Y EJE B-B
ELIMINACIÓN DE MATERIAL EXCEDENTE m3
ELIMINACIÓN DE MATERIAL EN ZAPATAS
ELIMINACIÓN DE MATERIAL EN CC
ADQUISICIÓN DE MATERIAL DE PRÉSTAMO PARA OBRA
OBRAS DE CONCRETO SIMPLE
SOLADOS m2
Z-1
Z-2
Z-3
Z-3A
CIMIENTOS CORRIDOS
CONCRETO EN CIMIENTOS CORRIDOS F'C=100KG/CM2, C:H 1:10 +30%P.G. m3
EJE X
EJE C-C ENTRE EJE 1-1 Y EJE 2-2
EJE C-C ENTRE EJE 2-2 Y EJE 3-3
EJE C-C ENTRE EJE 3-3 Y EJE 4-4
EJE C-C ENTRE EJE 4-4 Y EJE 5-5
EJE C-C ENTRE EJE 5-5 Y EJE 6-6
EJE C-C ENTRE EJE 6-6 Y EJE 7-7
EJE C-C ENTRE EJE 7-7 Y EJE 8-8
EJE B-B ENTRE EJE 7-7 Y EJE 8-8
EJE A-A ENTRE EJE 1-1 Y EJE 2-2
EJE A-A ENTRE EJE 2-2 Y EJE 3-3
EJE A-A ENTRE EJE 3-3 Y EJE 4-4
EJE A-A ENTRE EJE 4-4 Y EJE 5-5
EJE A-A ENTRE EJE 5-5 Y EJE 6-6
EJE A-A ENTRE EJE 6-6 Y EJE 7-7
EJE Y
EJE 1-1 ENTRE EJE C-C Y EJE B-B
EJE 1-1 ENTRE EJE B-B Y EJE A-A
EJE 3-3 ENTRE EJE C-C Y EJE A-A
EJE 5-5 ENTRE EJE C-C Y EJE A-A
EJE 7-7 ENTRE EJE C-C Y EJE A-A
EJE 8-8 ENTRE EJE C-C Y EJE B-B
ENCOFRADO Y DESENCOFRADO EN CIMIENTOS CORRIDOS m2
EJE X
EJE C-C ENTRE EJE 1-1 Y EJE 2-2
EJE C-C ENTRE EJE 2-2 Y EJE 3-3
EJE C-C ENTRE EJE 3-3 Y EJE 4-4
EJE C-C ENTRE EJE 4-4 Y EJE 5-5
EJE C-C ENTRE EJE 5-5 Y EJE 6-6
EJE C-C ENTRE EJE 6-6 Y EJE 7-7
EJE C-C ENTRE EJE 7-7 Y EJE 8-8
EJE B-B ENTRE EJE 7-7 Y EJE 8-8
EJE A-A ENTRE EJE 1-1 Y EJE 2-2
EJE A-A ENTRE EJE 2-2 Y EJE 3-3
EJE A-A ENTRE EJE 3-3 Y EJE 4-4
EJE A-A ENTRE EJE 4-4 Y EJE 5-5
EJE A-A ENTRE EJE 5-5 Y EJE 6-6
EJE A-A ENTRE EJE 6-6 Y EJE 7-7
EJE Y
EJE 1-1 ENTRE EJE C-C Y EJE B-B
EJE 1-1 ENTRE EJE B-B Y EJE A-A
EJE 3-3 ENTRE EJE C-C Y EJE A-A
EJE 5-5 ENTRE EJE C-C Y EJE A-A
EJE 7-7 ENTRE EJE C-C Y EJE A-A
EJE 8-8 ENTRE EJE C-C Y EJE B-B
SOBRECIMIENTOS
CONCRETO EN SOBRECIMIENTOS F'C=140KG/CM2, C:H 1:8+30%P.M. m3
EJE X
EJE C-C ENTRE EJE 1-1 Y EJE 2-2
EJE C-C ENTRE EJE 2-2 Y EJE 3-3
EJE C-C ENTRE EJE 3-3 Y EJE 4-4
EJE C-C ENTRE EJE 4-4 Y EJE 5-5
EJE C-C ENTRE EJE 5-5 Y EJE 6-6
EJE C-C ENTRE EJE 6-6 Y EJE 7-7
EJE C-C ENTRE EJE 7-7 Y EJE 8-8
EJE B-B ENTRE EJE 7-7 Y EJE 8-8
EJE A-A ENTRE EJE 1-1 Y EJE 2-2
EJE A-A ENTRE EJE 2-2 Y EJE 3-3
EJE A-A ENTRE EJE 3-3 Y EJE 4-4
EJE A-A ENTRE EJE 4-4 Y EJE 5-5
EJE A-A ENTRE EJE 5-5 Y EJE 6-6
EJE A-A ENTRE EJE 6-6 Y EJE 7-7
EJE Y
EJE 1-1 ENTRE EJE C-C Y EJE B-B
EJE 1-1 ENTRE EJE B-B Y EJE A-A
EJE 3-3 ENTRE EJE C-C Y EJE A-A
EJE 5-5 ENTRE EJE C-C Y EJE A-A
EJE 7-7 ENTRE EJE C-C Y EJE A-A
EJE 8-8 ENTRE EJE C-C Y EJE B-B
ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS m2
EJE X
EJE C-C ENTRE EJE 1-1 Y EJE 2-2
EJE C-C ENTRE EJE 2-2 Y EJE 3-3
EJE C-C ENTRE EJE 3-3 Y EJE 4-4
EJE C-C ENTRE EJE 4-4 Y EJE 5-5
EJE C-C ENTRE EJE 5-5 Y EJE 6-6
EJE C-C ENTRE EJE 6-6 Y EJE 7-7
EJE C-C ENTRE EJE 7-7 Y EJE 8-8
EJE B-B ENTRE EJE 7-7 Y EJE 8-8
EJE A-A ENTRE EJE 1-1 Y EJE 2-2
EJE A-A ENTRE EJE 2-2 Y EJE 3-3
EJE A-A ENTRE EJE 3-3 Y EJE 4-4
EJE A-A ENTRE EJE 4-4 Y EJE 5-5
EJE A-A ENTRE EJE 5-5 Y EJE 6-6
EJE A-A ENTRE EJE 6-6 Y EJE 7-7
EJE Y
EJE 1-1 ENTRE EJE C-C Y EJE B-B
EJE 1-1 ENTRE EJE B-B Y EJE A-A
EJE 3-3 ENTRE EJE C-C Y EJE A-A
EJE 5-5 ENTRE EJE C-C Y EJE A-A
EJE 7-7 ENTRE EJE C-C Y EJE A-A
EJE 8-8 ENTRE EJE C-C Y EJE B-B
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS m3
Z-1
Z-2
Z-3
Z-3-A
ENCOFRADO Y DESENCOFRADO EN ZAPATAS m2
Z-1
Z-2
Z-3
Z-3-A
ARMADURA DE ACERO EN ZAPATAS kg
Z-1 x
y
Z-2 X
Y
Z-3 x
y
Z-3-A X
Y
COLUMNAS
CONCRETO EN COLUMNAS m3
COLUMNAS
C-1
C-2
C-3
C-4
PL
COLUMNETAS
C-A-1
C-A-2
C-A-3
ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2
COLUMNAS
C-1
C-2
C-3
C-4
PL
COLUMNETAS
C-A-1
C-A-2
C-A-3
ARMADURA DE ACERO EN COLUMNAS kg
COLUMNAS
C-1
C-2
C-3
C-4
PL
COLUMNETAS
C-A-1
C-A-2
C-A-3
VIGAS
CONCRETO EN VIGAS m3

V1 EJE 3-3,.4-4, Y 5 -5 ENTRE EYG


V2 EJE 6-6 ENTRE D-G
VA EJE 1-1 ENTRE G-E
VA EJE G-G ENTRE 1y2
VA EJE G-G Y D-D ENTRE 2Y3
VA EJE G-G Y D-D ENTRE 3Y4
VA EJE G-G ENTRE 4 Y5
VA EJE D-D ENTRE 5Y6
VA EJE G-G ENTRE 5Y6
VCH EJE 2-2 ENTRE DYE
VCH EJE E-E ENTRE 1 Y 2
Vb EJE E-E Y F'-F' ENTRE 4Y5
Vb EJE 1-1 ENTRE EYG

ENCOFRADO Y DESENCOFRADO EN VIGAS m2


V1 EJE 3-3,.4-4, Y 5 -5 ENTRE EYG
V2 EJE 6-6 ENTRE D-G
VA EJE 1-1 ENTRE G-E
VA EJE G-G ENTRE 1y2
VA EJE G-G Y D-D ENTRE 2Y3
VA EJE G-G Y D-D ENTRE 3Y4
VA EJE G-G ENTRE 4 Y5
VA EJE G-G ENTRE 5Y6
VCH EJE 2-2 ENTRE DYE
VCH EJE E-E ENTRE 1 Y 2
Vb EJE E-E Y F'-F' ENTRE 4Y5
Vb EJE 1-1 ENTRE EYG
ARMADURA DE ACERO EN VIGAS kg
V1 (25X35) EJE 3-3,.4-4, Y 5 -5 ENTRE EYG (1/2")
V1 (25X35) EJE 3-3,.4-4, Y 5 -5 ENTRE EYG (5/8")
ESTRIBOS EJE 3-3,.4-4, Y 5 -5 ENTRE EYG (1/4")

V2 (.25X.30) EJE 6-6 ENTRE DYG (1/2")


V2 (.25X.30) EJE 6-6 ENTRE DYG (1/2")
ESTRIBOS EJE 6-6 ENTRE DYG (1/4")
VA (25X20) EJE D-D ENTRE 2,3Y4 (1/2")
VA (25X20) EJE D-D ENTRE 5Y6 (1/2")
VA (25X20) EJE G-G ENTRE 1,2,3,4,5 Y6 (1/2")
ESTRIBOS EJE 1-1 ENTRE EYG(1/4")
ESTRIBOS EJE G-G ENTRE 1Y2 (1/4")
ESTRIBOS EJE G-G Y D-D ENTRE 2Y3 (1/4")
ESTRIBOS EJE G-G Y D-D ENTRE 3Y4 (1/4")
ESTRIBOS EJE G-G ENTRE 4 Y5 (1/4")
ESTRIBOS EJE D-D ENTRE 5Y6 (1/4")
ESTRIBOS EJE G-G ENTRE 5Y6 (1/4")
Vb (15x.20) EJE F-F ENTRE 4Y5 (1/2")
ESTRIBOS EJE F-F ENTRE 4Y5 (1/4")
VOLADO Vb (15x.20) EJE F-F ENTRE FYG (1/2")
ESTRIBOS VOLADO EJE F-F ENTRE FYG (1/4")
VCH (25X20) EJE E-E, ENTRE 1Y2 (1/2")
VCH (25X20) EJE E-E, ENTRE 1Y2 (1/2")
VCH (25X20) EJE 2-2, ENTRE D-G (1/2")
VCH (25X20) EJE 2-2, ENTRE D-G (1/2")
ESTRIBOS EJE E-E, ENTRE 1Y2 (1/4")
ESTRIBOS EJE 2-2, ENTRE D-E (1/4")
ESTRIBOS EJE 2-2, ENTRE EYG (1/4")
ENTRE EJE 4-4, 5-5 CON EJE C-C, A-A
ENTRE EJE 5-5, 6-6 CON EJE C-C, A-A
ENTRE EJE 6-6, 7-7 CON EJE C-C, A-A
ENTRE EJE 7-7, 8-8 CON EJE C-C, B-B
ENTRE EJE V1-V1, 1-1 CON EJE C-C, V4-V4
ENTRE EJE 1-1, 2-2 CON EJE A-A, V4-V4
ENTRE EJE 2-2, 3-3 CON EJE A-A, V4-V4
ENTRE EJE 3-3, 4-4 CON EJE A-A, V4-V4
ENTRE EJE 4-4, 5-5 CON EJE A-A, V4-V4
ENTRE EJE 5-5, 6-6 CON EJE A-A, V4-V4
ENTRE EJE 6-6, 7-7 CON EJE A-A, V4-V4
ENTRE EJE 7-7, 8-8 CON EJE B-B, V3-V3
ENTRE EJE 7-7, V2-V2 CON EJE B-B, V4-V4
ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA m2
ENTRE EJE 1-1 , 2-2 CON EJE C-C, A-A
ENTRE EJE 2-2, 3-3 CON EJE C-C, A-A
ENTRE EJE 3-3, 4-4 CON EJE C-C, A-A
ENTRE EJE 4-4, 5-5 CON EJE C-C, A-A
ENTRE EJE 5-5, 6-6 CON EJE C-C, A-A
ENTRE EJE 6-6, 7-7 CON EJE C-C, A-A
ENTRE EJE 7-7, 8-8 CON EJE C-C, B-B
ENTRE EJE V1-V1, 1-1 CON EJE C-C, V4-V4
ENTRE EJE 1-1, 2-2 CON EJE A-A, V4-V4
ENTRE EJE 2-2, 3-3 CON EJE A-A, V4-V4
ENTRE EJE 3-3, 4-4 CON EJE A-A, V4-V4
ENTRE EJE 4-4, 5-5 CON EJE A-A, V4-V4
ENTRE EJE 5-5, 6-6 CON EJE A-A, V4-V4
ENTRE EJE 6-6, 7-7 CON EJE A-A, V4-V4
ENTRE EJE 7-7, 8-8 CON EJE B-B, V3-V3
ENTRE EJE 7-7, V2-V2 CON EJE B-B, V4-V4
ARMADURA DE ACERO EN LOSA ALIGERADA kg
VIGUETAS
BLOQUE A
EN EL EJE A-A Y C-C NTRE EL EJE 1-1 Y 2-2
EN EL EJE A-A Y C-C NTRE EL EJE2-2 Y 3-3
EN EL EJE A-A Y C-C NTRE EL EJE3-3 Y 4-4
EN EL EJE A-A Y C-C NTRE EL EJE 4-4 Y 5-5
EN EL EJE A-A Y C-C NTRE EL EJE 5-5 Y 6-6
EN EL EJE A-A Y C-C NTRE EL EJE 6-6 Y 7-7
ACERO TEMPERATURA
BLOQUE A
EN EL EJE A-A Y C-C NTRE EL EJE 1-1 Y 2-2
EN EL EJE A-A Y C-C NTRE EL EJE2-2 Y 3-3
EN EL EJE A-A Y C-C NTRE EL EJE3-3 Y 4-4
EN EL EJE A-A Y C-C NTRE EL EJE 4-4 Y 5-5
EN EL EJE A-A Y C-C NTRE EL EJE 5-5 Y 6-6
EN EL EJE A-A Y C-C NTRE EL EJE 6-6 Y 7-7
LADRILLO EN LOSA ALIGERADA und
ENTRE EJE 1-1 , 2-2 CON EJE C-C, A-A
ENTRE EJE 2-2, 3-3 CON EJE C-C, A-A
ENTRE EJE 3-3, 4-4 CON EJE C-C, A-A
ENTRE EJE 4-4, 5-5 CON EJE C-C, A-A
ENTRE EJE 5-5, 6-6 CON EJE C-C, A-A
ENTRE EJE 6-6, 7-7 CON EJE C-C, A-A
ENTRE EJE 7-7, 8-8 CON EJE C-C, B-B
ENTRE EJE V1-V1, 1-1 CON EJE C-C, V4-V4
ENTRE EJE 1-1, 2-2 CON EJE A-A, V4-V4
ENTRE EJE 2-2, 3-3 CON EJE A-A, V4-V4
ENTRE EJE 3-3, 4-4 CON EJE A-A, V4-V4
ENTRE EJE 4-4, 5-5 CON EJE A-A, V4-V4
ENTRE EJE 5-5, 6-6 CON EJE A-A, V4-V4
ENTRE EJE 6-6, 7-7 CON EJE A-A, V4-V4
ENTRE EJE 7-7, 8-8 CON EJE B-B, V3-V3
ENTRE EJE 7-7, V2-V2 CON EJE B-B, V4-V4
RADOS

° 328,TACNA

DIMENSIONES
CANTIDAD PARCIAL TOTAL
LARGO ANCHO ALTURA

15.00 5.50 77.70 77.70

16.84
4.00 1.20 1.00 1.30 6.24
5.00 1.00 1.00 1.30 6.50
1.10 1.00 1.00 1.30 1.43
1.00 1.00 1.03 1.30 1.33
1.00 1.00 1.03 1.30 1.33
20.66

7.11 0.50 1.00 3.56


2.28 0.50 1.00 1.14
2.87 0.50 1.00 1.44
6.90 0.50 1.00 3.45
8.75 0.50 1.00 4.38

2.10 0.50 1.00 1.05


0.85 0.50 1.00 0.43
2.30 0.50 1.00 1.15
2.30 0.50 1.00 1.15
2.90 0.50 1.00 1.45
2.95 0.50 1.00 1.48

8.00 Área= 1.50 12.00 12.00


8.00 Área= 5.25 42.00 42.00

25.20
Área= 1.07 1.10 1.18
Área= 0.53 0.40 0.21
Área= 0.77 1.10 0.85
Área= 0.75 0.40 0.30
Área= 1.36 1.10 1.49
Área= 0.31 0.40 0.12
Área= 1.07 1.10 1.18
Área= 0.39 0.40 0.16
Área= 2.15 1.10 2.37
Área= 0.33 0.40 0.13
Área= 1.43 1.10 1.57
Área= 0.30 0.40 0.12
Área= 0.92 1.10 1.01
Área= 0.70 0.40 0.28
Área= 1.43 1.10 1.57
Área= 0.30 0.40 0.12
Área= 0.93 1.10 1.02
Área= 0.70 0.40 0.28
Área= 1.43 1.10 1.57
Área= 0.30 0.40 0.12
Área= 1.66 1.10 1.83
Área= 0.38 0.40 0.15
Área= 1.42 1.10 1.56
Área= 0.35 0.40 0.14
Área= 1.92 1.10 2.11
Área= 0.19 0.40 0.08
Área= 1.17 1.10 1.28
Área= 0.54 0.40 0.22
Área= 1.92 1.10 2.11
Área= 0.19 0.40 0.08
4.63

Área= 0.93 0.20 0.19


Área= 0.93 0.20 0.19
Área= 0.93 0.20 0.19
Área= 0.93 0.20 0.19
Área= 0.93 0.20 0.19
Área= 0.84 0.20 0.17
Área= 0.46 0.20 0.09
Área= 0.76 0.20 0.15
Área= 1.13 0.20 0.23
Área= 1.30 0.20 0.26
Área= 1.19 0.20 0.24
Área= 1.30 0.20 0.26
Área= 1.19 0.20 0.24
Área= 1.20 0.20 0.24

Área= 0.39 0.20 0.08


Área= 0.54 0.20 0.11
Área= 2.30 0.20 0.46
Área= 2.28 0.20 0.46
Área= 2.30 0.20 0.46
Área= 1.36 0.20 0.27
14.39
-4.16
18.55
24.60 24.60

30.16
4.00 1.50 1.30 7.80
1.00 2.50 1.20 3.00
7.00 1.60 1.30 14.56
2.00 1.60 1.50 4.80

33.66

3.55 0.50 0.80 1.42


3.50 0.50 0.80 1.40
3.50 0.50 0.80 1.40
3.50 0.50 0.80 1.40
3.50 0.50 0.80 1.40
3.55 0.50 0.80 1.42
1.64 0.50 0.80 0.66
1.46 0.60 0.80 0.70
3.35 0.60 0.80 1.61
3.53 0.60 0.80 1.69
3.50 0.60 0.80 1.68
3.52 0.60 0.80 1.69
3.50 0.60 0.80 1.68
3.37 0.60 0.80 1.62

2.45 0.50 0.80 0.98


2.35 0.50 0.80 0.94
6.40 0.60 0.90 3.46
6.40 0.60 0.90 3.46
6.40 0.60 0.90 3.46
3.96 0.50 0.80 1.60
119.67
2.00 3.55 0.80 5.68
2.00 3.50 0.80 5.60
2.00 3.50 0.80 5.60
2.00 3.50 0.80 5.60
2.00 3.50 0.80 5.60
2.00 3.55 0.80 5.68
TOTAL= 3.10 0.80 2.48
2.00 1.46 0.80 2.34
2.00 3.35 0.80 5.36
2.00 3.53 0.80 5.65
2.00 3.50 0.80 5.60
2.00 3.52 0.80 5.63
2.00 3.50 0.80 5.60
2.00 3.37 0.80 5.39

2.00 2.45 0.80 3.92


2.00 2.35 0.80 3.76
2.00 6.40 0.90 11.52
2.00 6.40 0.90 11.52
TOTAL= 12.10 0.90 10.89
TOTAL= 7.82 0.80 6.26

3.89

3.55 0.15 0.40 0.21


3.50 0.15 0.40 0.21
3.50 0.10 0.40 0.14
3.50 0.15 0.40 0.21
3.50 0.15 0.40 0.21
3.55 0.15 0.40 0.21
1.74 0.10 0.40 0.07
0.80 0.15 0.40 0.05
3.35 0.15 0.40 0.20
2.33 0.15 0.40 0.14
3.50 0.10 0.40 0.14
2.32 0.15 0.40 0.14
3.50 0.15 0.40 0.21
2.17 0.15 0.40 0.13

2.45 0.15 0.40 0.15


2.35 0.10 0.40 0.09
6.40 0.15 0.40 0.38
6.40 0.15 0.40 0.38
6.40 0.15 0.40 0.38
3.75 0.15 0.40 0.23
54.85

2.00 3.55 0.40 2.84


2.00 3.50 0.40 2.80
2.00 3.50 0.40 2.80
2.00 3.50 0.40 2.80
2.00 3.50 0.40 2.80
2.00 3.55 0.40 2.84
2.00 1.74 0.40 1.39
2.00 0.80 0.40 0.64
2.00 3.35 0.40 2.68
2.00 2.33 0.40 1.86
2.00 3.50 0.40 2.80
2.00 2.32 0.40 1.86
2.00 3.50 0.40 2.80
2.00 2.17 0.40 1.74

2.00 2.45 0.40 1.96


2.00 2.35 0.40 1.88
2.00 6.40 0.40 5.12
2.00 6.40 0.40 5.12
2.00 6.40 0.40 5.12
2.00 3.75 0.40 3.00

12.06
4.00 1.50 1.30 0.40 3.12
1.00 2.50 1.20 0.40 1.20
7.00 1.60 1.30 0.40 5.82
2.00 1.60 1.50 0.40 1.92
33.12
8.00 2.80 0.40 8.96
2.00 3.70 0.40 2.96
14.00 2.90 0.40 16.24
4.00 3.10 0.40 4.96
480.71
8.00 5.40 PESO(kg)= 1.55 66.96
8.00 4.60 PESO(kg)= 1.55 57.04
2.00 4.20 PESO(kg)= 1.55 13.02
2.00 15.67 PESO(kg)= 1.55 48.57
14.00 5.80 PESO(kg)= 1.55 125.86
14.00 4.60 PESO(kg)= 1.55 99.82
4.00 5.80 PESO(kg)= 1.55 35.96
4.00 5.40 PESO(kg)= 1.55 33.48

55.33

2.00 Área= 0.60 4.45 5.34


2.00 Área= 0.60 4.45 5.34
6.00 Área= 1.38 4.45 36.85
4.00 Área= 0.19 4.45 3.38
1.00 Área= 0.38 4.45 1.67

20.00 Área= 0.03 1.55 0.93


5.00 Área= 0.06 4.45 1.34
14.00 Área= 0.02 1.55 0.49
168.00

2.00 2.00 3.60 14.40


2.00 1.60 3.60 11.52
6.00 2.40 3.60 51.84
4.00 2.20 3.60 31.68
1.00 3.80 3.60 13.68

20.00 0.70 1.20 16.80


5.00 1.00 3.60 18.00
14.00 0.60 1.20 10.08
506.57

93.71
79.81
37.06
101.33
163.24
0.00
5.36
21.04
5.01

3.25

3.00 4.48 0.25 0.35 1.17


1.00 4.49 0.25 0.30 0.34
1.00 3.43 0.25 0.20 0.17
1.00 3.60 0.25 0.20 0.18
2.00 2.20 0.25 0.20 0.22
2.00 2.10 0.25 0.20 0.21
1.00 2.25 0.25 0.20 0.11
1.00 3.49 0.25 0.20 0.17
1.00 3.11 0.25 0.20 0.16
1.00 1.15 0.25 0.20 0.06
1.00 3.60 0.25 0.20 0.18
2.00 2.25 0.15 0.20 0.14
1.00 4.73 0.15 0.20 0.14

40.38
3.00 4.48 0.95 12.75
1.00 4.49 0.85 3.82
1.00 3.43 0.65 2.23
1.00 3.60 0.65 2.34
2.00 2.20 0.65 2.86
2.00 2.10 0.65 2.73
1.00 2.25 0.65 1.46
2.00 3.10 0.65 4.03
1.00 1.15 0.65 0.75
1.00 3.60 0.65 2.34
2.00 2.25 0.55 2.48
1.00 4.73 0.55 2.60
402.76
3 48.48
3 98.61
3 18.39
0
1 21.69
1 25.53
1 5.07
1 20.46
1 16.68
71.69
1 3.08
1 3.26
2 2.17
2 2.17
1 2.17
1 3.08
1 2.9
2 17.24
2 2.6
1 19.1
1 3.84
12.89
12.36
14.15
15.12
1 3.62
1 1.27
1 3.62
3.04 ÁREA= 27.05 0.20 2.37
3.04 ÁREA= 27.00 0.20 2.36
3.02 ÁREA= 26.86 0.20 2.35
0.66 ÁREA= 5.90 0.20 0.52
0.25 ÁREA= 2.19 0.20 0.19
0.13 ÁREA= 1.19 0.20 0.10
0.13 ÁREA= 1.19 0.20 0.10
0.13 ÁREA= 1.19 0.20 0.10
0.13 ÁREA= 1.19 0.20 0.10
0.13 ÁREA= 1.19 0.20 0.10
0.13 ÁREA= 1.19 0.20 0.10
0.04 ÁREA= 0.38 0.20 0.03
0.13 ÁREA= 1.13 0.20 0.10
178.57
3.95 6.80 26.86
3.97 6.80 27.00
3.98 6.80 27.06
3.98 6.80 27.06
3.97 6.80 27.00
3.95 6.80 26.86
1.76 3.35 5.90
0.30 7.30 2.19
3.95 0.30 1.19
3.97 0.30 1.19
3.98 0.30 1.19
3.98 0.30 1.19
3.97 0.30 1.19
3.95 0.30 1.19
1.26 0.30 0.38
3.75 0.30 1.13
61.40

61.09
61.40
61.55
61.55
147.04
146.30

27.62
27.76
27.83
27.83
27.76
27.62
1487.92
8.33 ÁREA= 26.86 223.83
8.33 ÁREA= 27.01 225.08
8.33 ÁREA= 27.05 225.42
8.33 ÁREA= 27.05 225.39
8.33 ÁREA= 27.00 225.03
8.33 ÁREA= 26.86 223.83
8.33 ÁREA= 5.90 49.14
8.33 ÁREA= 2.19 18.25
8.33 ÁREA= 1.19 9.88
8.33 ÁREA= 1.19 9.93
8.33 ÁREA= 1.19 9.95
8.33 ÁREA= 1.19 9.90
8.33 ÁREA= 1.19 9.89
8.33 ÁREA= 1.19 9.88
8.33 ÁREA= 0.38 3.15
8.33 ÁREA= 1.13 9.38
02.03.04 VIGAS
02.03.04.01 CONCRETO EN VIGAS m3

V1 EJE 3-3,.4-4, Y 5 -5 ENTRE EYG


V2 EJE 6-6 ENTRE D-G
VA EJE 1-1 ENTRE G-E
VA EJE G-G ENTRE 1y2
VA EJE G-G Y D-D ENTRE 2Y3
VA EJE G-G Y D-D ENTRE 3Y4
VA EJE G-G ENTRE 4 Y5
VA EJE D-D ENTRE 5Y6
VA EJE G-G ENTRE 5Y6
VCH EJE 2-2 ENTRE DYE
VCH EJE E-E ENTRE 1 Y 2
Vb EJE E-E Y F'-F' ENTRE 4Y5
Vb EJE 1-1 ENTRE EYG

02.03.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2


V1 EJE 3-3,.4-4, Y 5 -5 ENTRE EYG
V2 EJE 6-6 ENTRE D-G
VA EJE 1-1 ENTRE G-E
VA EJE G-G ENTRE 1y2
VA EJE G-G Y D-D ENTRE 2Y3
VA EJE G-G Y D-D ENTRE 3Y4
VA EJE G-G ENTRE 4 Y5
VA EJE G-G ENTRE 5Y6
VCH EJE 2-2 ENTRE DYE
VCH EJE E-E ENTRE 1 Y 2
Vb EJE E-E Y F'-F' ENTRE 4Y5
Vb EJE 1-1 ENTRE EYG
02.03.04.03 ARMADURA DE ACERO EN VIGAS kg
V1 (25X35) EJE 3-3,.4-4, Y 5 -5 ENTRE EYG (1/2")
V1 (25X35) EJE 3-3,.4-4, Y 5 -5 ENTRE EYG (5/8")
ESTRIBOS EJE 3-3,.4-4, Y 5 -5 ENTRE EYG (1/4")
V2 (.25X.30) EJE 6-6 ENTRE DYG (1/2")
V2 (.25X.30) EJE 6-6 ENTRE DYG (1/2")
ESTRIBOS EJE 6-6 ENTRE DYG (1/4")
VA (25X20) EJE D-D ENTRE 2,3Y4 (1/2")
VA (25X20) EJE D-D ENTRE 5Y6 (1/2")
VA (25X20) EJE G-G ENTRE 1,2,3,4,5 Y6 (1/2")
ESTRIBOS EJE 1-1 ENTRE EYG(1/4")
ESTRIBOS EJE G-G ENTRE 1Y2 (1/4")
ESTRIBOS EJE G-G Y D-D ENTRE 2Y3 (1/4")
ESTRIBOS EJE G-G Y D-D ENTRE 3Y4 (1/4")
ESTRIBOS EJE G-G ENTRE 4 Y5 (1/4")
ESTRIBOS EJE D-D ENTRE 5Y6 (1/4")
ESTRIBOS EJE G-G ENTRE 5Y6 (1/4")
Vb (15x.20) EJE F-F ENTRE 4Y5 (1/2")
ESTRIBOS EJE F-F ENTRE 4Y5 (1/4")
VOLADO Vb (15x.20) EJE F-F ENTRE FYG (1/2")
ESTRIBOS VOLADO EJE F-F ENTRE FYG (1/4")
VCH (25X20) EJE E-E, ENTRE 1Y2 (1/2")
VCH (25X20) EJE E-E, ENTRE 1Y2 (1/2")
VCH (25X20) EJE 2-2, ENTRE D-G (1/2")
VCH (25X20) EJE 2-2, ENTRE D-G (1/2")
ESTRIBOS EJE E-E, ENTRE 1Y2 (1/4")
ESTRIBOS EJE 2-2, ENTRE D-E (1/4")
ESTRIBOS EJE 2-2, ENTRE EYG (1/4")
3.25

3.00 4.48 0.25 0.35 1.17


1.00 4.49 0.25 0.30 0.34
1.00 3.43 0.25 0.20 0.17
1.00 3.60 0.25 0.20 0.18
2.00 2.20 0.25 0.20 0.22
2.00 2.10 0.25 0.20 0.21
1.00 2.25 0.25 0.20 0.11
1.00 3.49 0.25 0.20 0.17
1.00 3.11 0.25 0.20 0.16
1.00 1.15 0.25 0.20 0.06
1.00 3.60 0.25 0.20 0.18
2.00 2.25 0.15 0.20 0.14
1.00 4.73 0.15 0.20 0.14

27.63
3.00 4.48 0.95 12.75
1.00 4.49 0.85 3.82
1.00 3.43 0.65 2.23
1.00 3.60 0.65 2.34
2.00 2.20 0.65 2.86
2.00 2.10 0.65 2.73
1.00 2.25 0.65 1.46
2.00 3.10 0.65 4.03
1.00 1.15 0.65 0.75
1.00 3.60 0.65 2.34
2.00 2.25 0.55 2.48
1.00 4.73 0.55 2.60
402.76
3 48.48
3 98.61
3 18.39
1 21.69
1 25.53
1 5.07
1 20.46
1 16.68
71.69
1 3.08
1 3.26
2 2.17
2 2.17
1 2.17
1 3.08
1 2.9
2 17.24
2 2.6
1 19.1
1 3.84
12.89
12.36
14.15
15.12
1 3.62
1 1.27
1 3.62
05
04.01
04.01.01

05.01

05.02

04.04

04.05

04.06
04.07
04.01.07.01

04.08.

05
05.01

05.02

05.03

05.08
05.08.01
INSTALACIONES ELÉCTRICAS Y MECÁNICAS
CONEXIÓN A LA RED EXTERNA DE MEDIDORES
LABORES ACCESORIAS
OBRAS DE ALBAÑILERÍA
BUZON DE CONCRETO DE 0.60x0.60x0.65 m

SALIDA
SALIDA PARA LUMINARIAS
ARTEFACTO TIPO GALAXIE CON LAMPARA INCANDESCENTE ADOSADA AL TECHO 50W-220
ARTEFACTO TIPO GALAXIE CON LAMPARA INCANDESCENTE ADOSADA A LA PARED 50W-220
ARTEFACTO FLUORESCENTE LINEAL RECTO , CON LAMPARA MASTER-TL5-28W ADOSADO 2x28W : 32W-220V
SPOTH LISHT EN TECHO

SALIDA PARA TOMACORRIENTES


TOMACORRIENTE MONOFASICO DOBLE
TOMACORRIENTE MONOFASICO DOBLE C/PUESTA A TIERRA
TOMACORRIENTE MONOFASICO DOBLE C/PUESTA A AGUA

SALIDA PARA INTERRUPTORES


SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE

CANALIZACIÓN, CONDUCTORES Y TUBERÍAS


C-1:TUBERIA PVC SEL
C-2:TUBERIA PVC SEL
C-3:TUBERIA PVC SEL
CIRCUITO DE MEDIDOR A T2
PUESTA A TIERRA
CIRCUITO A TIMBRE

CONDUCTORES Y CABLES DE ENERGÍA EN TUBERÍAS


CIRCUITO DE ALUMBRADO E INTERRUPTORES
C-1:TUBERIA PVC SEL
C-2:TUBERIA PVC SEL
C-3:TUBERIA PVC SEL
CIRCUITO DE MEDIDOR A T2
PUESTA A TIERRA
CIRCUITO A TIMBRE

TABLEROS PRINCIPALES
MEDIDOR M2
TABLEROS DE DISTRIBUCIÓN
TABLERO DE DISTRIBUCIÓN EMPOTRADO, CON BARRA DE COBRE PARA NEUTRO Y TIERRA

DISPOSITIVOS DE MANIOBRA Y PROTECCIÓN


TERMONAGNETICAS
POZO DE PUESTA A TIERRA CONVENCIONAL

ARTEFACTOS
LUMINARIAS
ARTEFACTO TIPO GALAXIE CON LAMPARA INCANDESCENTE ADOSADA AL TECHO 50W-220
ARTEFACTO TIPO GALAXIE CON LAMPARA INCANDESCENTE ADOSADA A LA PARED 50W-220
ARTEFACTO FLUORESCENTE LINEAL RECTO , CON LAMPARA MASTER-TL5-28W ADOSADO 2x28W : 32W-220V
SPOTH LISHT EN TECHO

INTERRUPTORES
SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE

TOMACORRIENTES
TOMACORRIENTE MONOFASICO DOBLE
TOMACORRIENTE MONOFASICO DOBLE C/PUESTA A TIERRA
TOMACORRIENTE MONOFASICO DOBLE C/PUESTA A AGUA
TIMBRE

INSTALACIONES DE COMUNICACIONES
CABLEADO
CIRCUITO DE ALTOPARLANTES POR TECHO CON CABLE 2x16 AWG SILICONEADO, POR TECHO O PARED
CIRCUITO DE ALTOPARLANTES POR PISO CON CABLE 2x16 AWG SILICONEADO, POR TECHO O PARED

CANALIZADORES
CIRCUITO SISTEMA PARLANTES TUBO HFT 20mm∅

SALIDA DE COMUNICACIONES
CAJA DE PASE PARA TELECOMUNICACIONES
SALIDA DE ALTO PARLANTE
SALIDA PARA PARLANTES
EQUIPOS ELÉCTRICOS Y MECÁNICOS
BOMBA PARA AGUA
unidad

glb

2.00

unid. 15.00
5 2
1 6
3 3
1 4

und 8.00
5 5
2 2
1 1

und 9.00
9 9

106.20
48.2
26.80
7.50
7.60
4.60
11.50

m 268.20

3.00 48.2 144.60


3.00 26.80 80.40
3.00 7.50 22.50
3.00 7.60
2.00 4.60 9.20
1.00 11.50 11.50

unid 1.00
1
unid 1.00
1.00

unid 1.00

1.00
1.00
unid. 10.00
unid.
5 5
1 1
3 3
1 1

unid. 9.00
9 9

8.00
5 5
2 2
1 1

m 32.60
17.02
15.58

m 32.60
32.60

pto 6.00
1.00
1.00
4.00
1.00
und 1.00 1.00