MANTENIMIENTO PERIODICO RUTA JU-114 EMP.

PE-24 A (CALABAZA) - APALLA CALABAZA - ULLIMARCA -


BADOPAMPA - HUANCAMACHAY - UNION PROGRESO - MANZANAYO - SAN IGNACIO - PUCACOCHA - EMP. JU-108
(MATAPA)

: MANTENIMIENTO PERIODICO RUTA JU-114 EMP. PE-24 A (CALABAZA) - APALLA CALABAZA - ULLIMARCA - BADOPAMPA - HUANCAMACHAY - UNION
PROYECTO PROGRESO - MANZANAYO - SAN IGNACIO - PUCACOCHA - EMP. JU-108 (MATAPA)

RUTA : JU - 114
ACTIVIDAD: 03.00 TRANSPORTE
FECHA: : NOVIEMBRE 2017

RESUMEN DE METRADOS - TRANSPORTE

ITEM PARTIDA UNIDAD METRADO

03.01 Transporte de Material Granular Hasta 1 Km m³-km 21,827.21


03.02 Transporte de Material Granular D > 1 Km m³-km 103,349.56
MANTENIMIENTO PERIODICO RUTA JU-114 EMP. PE-24 A (CALABAZA) - APALLA CALABAZA - ULLIMARCA - BADOPAMPA - HUANCAMACHAY - UNION PROGRESO - MANZANAYO - SAN IGNACIO -
PUCACOCHA - EMP. JU-108 (MATAPA)

: MANTENIMIENTO PERIODICO RUTA JU-114 EMP. PE-24 A (CALABAZA) - APALLA CALABAZA - ULLIMARCA - BADOPAMPA - HUANCAMACHAY - UNION PROGRESO - MANZANAYO - SAN
PROYECTO
IGNACIO - PUCACOCHA - EMP. JU-108 (MATAPA)

RUTA : JU - 114
ACTIVIDAD: 03.00 TRANSPORTE
FECHA: NOVIEMBRE 2017
SUSTENTO DE METRADOS TRANSPORTE DE MATERIAL GRANULAR

52+355
0+000

Cantera N° 01 Cantera N° 03 Cantera N° 05 CANTERA UBICACIÓN ACCESO


C-1 9+714.35 0.00
9+714.35 16+919.52 36+183.01 C-3 16+919.52 0.00
C-5 36+183.01 0.00
INICIO TRAMO FIN DE TRAMO
E
c03.01 Transporte de Material Granular Hasta 1 Km 21,827.21 m3-km
u
a03.02 Transporte de Material Granular D > 1 Km 103,349.56 m3-km
c
i
ó PAVIMENTOS
n
Ubicación de D.L.P.
FIN E Código Participación Acceso SA Espesor Volumen Momento D<=1km D>1km
INICIO (km) Canteras 120.00 m Distancia (km) Longitud (m) Ancho (m) Área (m2)
(km) m Cantera % (km) (m2) (m) (m3) (m3-km) (m3-km) (m3-km)
(km) (km)
p
a
l
0+000.00 1+000.00 m C-1 9.714 100.00% 0.00 0.12 9.09 1,000.00 3.15 3,150.00 0.00 0.12 378.00 3,437.53 378.00 3,059.53
1+000.00 2+000.00 e C-1 9.714 100.00% 0.00 0.12 8.09 1,000.00 4.20 4,200.00 0.00 0.12 504.00 4,079.38 504.00 3,575.38
2+000.00 3+000.00 ( C-1 9.714 100.00% 0.00 0.12 7.09 1,000.00 2.90 2,900.00 0.00 0.12 348.00 2,468.71 348.00 2,120.71
3+000.00 4+000.00 m C-1 9.714 100.00% 0.00 0.12 6.09 1,000.00 4.20 4,200.00 0.00 0.12 504.00 3,071.38 504.00 2,567.38
)
4+000.00 5+000.00 C-1 9.714 100.00% 0.00 0.12 5.09 1,000.00 3.50 3,500.00 0.00 0.12 420.00 2,139.48 420.00 1,719.48
5+000.00 6+000.00 C-1 9.714 100.00% 0.00 0.12 4.09 1,000.00 4.50 4,500.00 0.00 0.12 540.00 2,210.76 540.00 1,670.76
6+000.00 7+000.00 C-1 9.714 100.00% 0.00 0.12 3.09 1,000.00 4.00 4,000.00 0.00 0.12 480.00 1,485.12 480.00 1,005.12
7+000.00 8+000.00 ### C-1 9.714 100.00% 0.00 0.12 2.09 1,000.00 3.80 3,800.00 0.00 0.12 456.00 954.86 456.00 498.86
8+000.00 9+000.00 ### C-1 9.714 100.00% 0.00 0.12 1.09 1,000.00 4.59 4,590.00 0.00 0.12 550.80 602.58 550.80 51.78
9+000.00 10+000.00 C-1 9.714 100.00% 0.00 0.12 0.09 1,000.00 4.90 4,900.00 0.00 0.12 588.00 55.27 55.27 -
10+000.00 11+000.00 C-1 9.714 100.00% 0.00 0.12 0.67 1,000.00 4.50 4,500.00 0.00 0.12 540.00 359.64 359.64 -
11+000.00 12+000.00 C-1 9.714 100.00% 0.00 0.12 1.67 1,000.00 3.20 3,200.00 0.00 0.12 384.00 639.74 384.00 255.74
12+000.00 13+000.00 C-1 9.714 100.00% 0.00 0.12 2.67 1,000.00 4.00 4,000.00 0.00 0.12 480.00 1,279.68 480.00 799.68

13+000.00 14+000.00 C-3 16.919 100.00% 0.00 0.12 3.30 1,000.00 3.80 3,800.00 0.00 0.12 456.00 1,504.34 456.00 1,048.34
14+000.00 15+000.00 C-3 16.919 100.00% 0.00 0.12 2.30 1,000.00 4.50 4,500.00 0.00 0.12 540.00 1,241.46 540.00 701.46
15+000.00 16+000.00 C-3 16.919 100.00% 0.00 0.12 1.30 1,000.00 4.00 4,000.00 0.00 0.12 480.00 623.52 480.00 143.52
16+000.00 17+000.00 C-3 16.919 100.00% 0.00 0.12 0.30 1,000.00 4.50 4,500.00 0.00 0.12 540.00 161.46 161.46 -
17+000.00 18+000.00 C-3 16.919 100.00% 0.00 0.12 0.46 1,000.00 4.80 4,800.00 0.00 0.12 576.00 265.54 265.54 -
18+000.00 19+000.00 C-3 16.919 100.00% 0.00 0.12 1.46 1,000.00 4.00 4,000.00 0.00 0.12 480.00 701.28 480.00 221.28
19+000.00 20+000.00 C-3 16.919 100.00% 0.00 0.12 2.46 1,000.00 3.78 3,780.00 0.00 0.12 453.60 1,116.31 453.60 662.71
20+000.00 21+000.00 C-3 16.919 100.00% 0.00 0.12 3.46 1,000.00 4.50 4,500.00 0.00 0.12 540.00 1,868.94 540.00 1,328.94
21+000.00 22+000.00 C-3 16.919 100.00% 0.00 0.12 4.46 1,000.00 4.50 4,500.00 0.00 0.12 540.00 2,408.94 540.00 1,868.94
22+000.00 23+000.00 C-3 16.919 100.00% 0.00 0.12 5.46 1,000.00 3.80 3,800.00 0.00 0.12 456.00 2,490.22 456.00 2,034.22
23+000.00 24+000.00 C-3 16.919 100.00% 0.00 0.12 6.46 1,000.00 3.82 3,820.00 0.00 0.12 458.40 2,961.72 458.40 2,503.32
24+000.00 25+000.00 C-3 16.919 100.00% 0.00 0.12 7.46 1,000.00 4.20 4,200.00 0.00 0.12 504.00 3,760.34 504.00 3,256.34
25+000.00 26+000.00 C-3 16.919 100.00% 0.00 0.12 8.46 1,000.00 3.00 3,000.00 0.00 0.12 360.00 3,045.96 360.00 2,685.96
26+000.00 27+000.00 C-3 16.919 100.00% 0.00 0.12 9.46 1,000.00 4.00 4,000.00 0.00 0.12 480.00 4,541.28 480.00 4,061.28
MANTENIMIENTO PERIODICO RUTA JU-114 EMP. PE-24 A (CALABAZA) - APALLA CALABAZA - ULLIMARCA - BADOPAMPA - HUANCAMACHAY - UNION PROGRESO - MANZANAYO - SAN IGNACIO -
PUCACOCHA - EMP. JU-108 (MATAPA)

: MANTENIMIENTO PERIODICO RUTA JU-114 EMP. PE-24 A (CALABAZA) - APALLA CALABAZA - ULLIMARCA - BADOPAMPA - HUANCAMACHAY - UNION PROGRESO - MANZANAYO - SAN
PROYECTO
IGNACIO - PUCACOCHA - EMP. JU-108 (MATAPA)

RUTA : JU - 114
ACTIVIDAD: 03.00 TRANSPORTE
FECHA: NOVIEMBRE 2017
SUSTENTO DE METRADOS TRANSPORTE DE MATERIAL GRANULAR

52+355
0+000

Cantera N° 01 Cantera N° 03 Cantera N° 05 CANTERA UBICACIÓN ACCESO


C-1 9+714.35 0.00
9+714.35 16+919.52 36+183.01 C-3 16+919.52 0.00
C-5 36+183.01 0.00
INICIO TRAMO FIN DE TRAMO
E
c03.01 Transporte de Material Granular Hasta 1 Km 21,827.21 m3-km
u
a03.02 Transporte de Material Granular D > 1 Km 103,349.56 m3-km
c
i
ó PAVIMENTOS
n
Ubicación de D.L.P.
FIN E Código Participación Acceso SA Espesor Volumen Momento D<=1km D>1km
INICIO (km) Canteras 120.00 m Distancia (km) Longitud (m) Ancho (m) Área (m2)
(km) m Cantera % (km) (m2) (m) (m3) (m3-km) (m3-km) (m3-km)
(km) (km)
p
a
27+000.00 28+000.00 l C-5 36.183 100.00% 0.00 0.12 8.56 1,000.00 3.20 3,200.00 0.00 0.12 384.00 3,288.19 384.00 2,904.19
28+000.00 29+000.00 m C-5 36.183 100.00% 0.00 0.12 7.56 1,000.00 3.50 3,500.00 0.00 0.12 420.00 3,176.46 420.00 2,756.46
e
29+000.00 30+000.00 C-5 36.183 100.00% 0.00 0.12 6.56 1,000.00 3.20 3,200.00 0.00 0.12 384.00 2,520.19 384.00 2,136.19
30+000.00 31+000.00 ( C-5 36.183 100.00% 0.00 0.12 5.56 1,000.00 3.00 3,000.00 0.00 0.12 360.00 2,002.68 360.00 1,642.68
m
31+000.00 32+000.00 ) C-5 36.183 100.00% 0.00 0.12 4.56 1,000.00 3.00 3,000.00 0.00 0.12 360.00 1,642.68 360.00 1,282.68
32+000.00 33+000.00 C-5 36.183 100.00% 0.00 0.12 3.56 1,000.00 3.00 3,000.00 0.00 0.12 360.00 1,282.68 360.00 922.68
33+000.00 34+000.00 C-5 36.183 100.00% 0.00 0.12 2.56 1,000.00 3.40 3,400.00 0.00 0.12 408.00 1,045.70 408.00 637.70
34+000.00 35+000.00 C-5 36.183 100.00% 0.00 0.12 1.56 1,000.00 3.40 3,400.00 0.00 0.12 408.00 637.70 408.00 229.70
35+000.00 36+000.00 C-5 36.183 100.00% 0.00 0.12 0.56 1,000.00 3.00 3,000.00 0.00 0.12 360.00 202.68 202.68 -
36+000.00 37+000.00 C-5 36.183 100.00% 0.00 0.12 0.20 1,000.00 3.00 3,000.00 0.00 0.12 360.00 70.92 70.92 -
37+000.00 38+000.00 C-5 36.183 100.00% 0.00 0.12 1.20 1,000.00 3.00 3,000.00 0.00 0.12 360.00 430.92 360.00 70.92
38+000.00 39+000.00 C-5 36.183 100.00% 0.00 0.12 2.20 1,000.00 3.20 3,200.00 0.00 0.12 384.00 843.65 384.00 459.65
39+000.00 40+000.00 C-5 36.183 100.00% 0.00 0.12 3.20 1,000.00 3.50 3,500.00 0.00 0.12 420.00 1,342.74 420.00 922.74
40+000.00 41+000.00 C-5 36.183 100.00% 0.00 0.12 4.20 1,000.00 3.00 3,000.00 0.00 0.12 360.00 1,510.92 360.00 1,150.92
41+000.00 42+000.00 C-5 36.183 100.00% 0.00 0.12 5.20 1,000.00 4.43 4,430.00 0.00 0.12 531.60 2,762.73 531.60 2,231.13
42+000.00 43+000.00 C-5 36.183 100.00% 0.00 0.12 6.20 1,000.00 3.63 3,630.00 0.00 0.12 435.60 2,699.41 435.60 2,263.81
43+000.00 44+000.00 C-5 36.183 100.00% 0.00 0.12 7.20 1,000.00 3.80 3,800.00 0.00 0.12 456.00 3,281.83 456.00 2,825.83
44+000.00 45+000.00 C-5 36.183 100.00% 0.00 0.12 8.20 1,000.00 4.00 4,000.00 0.00 0.12 480.00 3,934.56 480.00 3,454.56
45+000.00 46+000.00 C-5 36.183 100.00% 0.00 0.12 9.20 1,000.00 3.20 3,200.00 0.00 0.12 384.00 3,531.65 384.00 3,147.65
46+000.00 47+000.00 C-5 36.183 100.00% 0.00 0.12 10.20 1,000.00 2.80 2,800.00 0.00 0.12 336.00 3,426.19 336.00 3,090.19
47+000.00 48+000.00 C-5 36.183 100.00% 0.00 0.12 11.20 1,000.00 4.00 4,000.00 0.00 0.12 480.00 5,374.56 480.00 4,894.56
48+000.00 49+000.00 C-5 36.183 100.00% 0.00 0.12 12.20 1,000.00 3.80 3,800.00 0.00 0.12 456.00 5,561.83 456.00 5,105.83
49+000.00 50+000.00 C-5 36.183 100.00% 0.00 0.12 13.20 1,000.00 4.50 4,500.00 0.00 0.12 540.00 7,126.38 540.00 6,586.38
50+000.00 51+000.00 C-5 36.183 100.00% 0.00 0.12 14.20 1,000.00 4.50 4,500.00 0.00 0.12 540.00 7,666.38 540.00 7,126.38
51+000.00 52+000.00 C-5 36.183 100.00% 0.00 0.12 15.20 1,000.00 4.00 4,000.00 0.00 0.12 480.00 7,294.56 480.00 6,814.56
52+000.00 52+355.00 C-5 36.183 100.00% 0.00 0.12 15.87 355.00 4.50 1,597.50 0.00 0.12 191.70 3,043.14 191.70 2,851.44
LONGITUD TOTAL 52,355.00 0.00 23,675.70 125,176.77 21,827.21 103,349.56

Dist.Media (km): 5.29


MANTENIMIENTO PERIODICO RUTA JU-114 EMP. PE-24 A (CALABAZA) - APALLA CALABAZA - ULLIMARCA - BADOPAMPA - HUANCAMACHAY - UNION PROGRESO - MANZANAYO - SAN IGNACIO - PUCACOCHA -
EMP. JU-108 (MATAPA)

: MANTENIMIENTO PERIODICO RUTA JU-114 EMP. PE-24 A (CALABAZA) - APALLA CALABAZA - ULLIMARCA - BADOPAMPA - HUANCAMACHAY - UNION PROGRESO - MANZANAYO - SAN IGNACIO -
PROYECTO
PUCACOCHA - EMP. JU-108 (MATAPA)
RUTA : JU - 114
ACTIVIDAD: : 03.00 TRANSPORTE
FECHA: : NOVIEMBRE 2017
Sustento de metrados de transporte de Agua
Calculo de la Distancia Media de Transporte FUENTE AGUA ACCESO

Fuente 1: 0.00

27+511.05

50+903.20
43+083.81
0
17+518.8

28+282.00

52+355
Fuente 2: 0.00
0+000

FUENTE DE AGUA N°1 FUENTE DE AGUA N°2 FUENTE DE AGUA N°3 FUENTE DE AGUA N°4 FUENTE DE AGUA N°6 Fuente 3: 0.00
E
c Fuente 4: 0.00
u
a Fuente 5: 0.00
o c
i tramo
Tram ó
Inicio n PAVIMENTOS Fin de

E Código Fte. Ubicación de Fte. Participación D.L.P. 120.00 Espesor Momento D<=1km (m3- D>1km (m3-
INICIO (km) FIN (km) Acceso (km) Distancia (km) Longitud (m) Ancho (m) Área (m2) SA (m2) Volumen (m3)
m Agua agua (km) % m (km) (m) (m3-km) km) km)
p
a
l
0+000.00 1+000.00 m F-1 17.518 100.00% 0.00 0.00 17.02 1,000.00 3.15 3,150.00 63.00 0.12 385.56 6,561.46 385.56 6,175.90
1+000.00 2+000.00 e F-1 17.518 100.00% 0.00 0.00 16.02 1,000.00 4.20 4,200.00 84.00 0.12 514.08 8,234.53 514.08 7,720.45
2+000.00 3+000.00 F-1 17.518 100.00% 0.00 0.00 15.02 1,000.00 2.90 2,900.00 58.00 0.12 354.96 5,330.79 354.96 4,975.83
(
3+000.00 4+000.00 m F-1 17.518 100.00% 0.00 0.00 14.02 1,000.00 4.20 4,200.00 84.00 0.12 514.08 7,206.37 514.08 6,692.29
4+000.00 5+000.00 ) F-1 17.518 100.00% 0.00 0.00 13.02 1,000.00 3.50 3,500.00 70.00 0.12 428.40 5,576.91 428.40 5,148.51
5+000.00 6+000.00 F-1 17.518 100.00% 0.00 0.00 12.02 1,000.00 4.50 4,500.00 90.00 0.12 550.80 6,619.51 550.80 6,068.71
6+000.00 7+000.00 F-1 17.518 100.00% 0.00 0.00 11.02 1,000.00 4.00 4,000.00 80.00 0.12 489.60 5,394.41 489.60 4,904.81
7+000.00 8+000.00 F-1 17.518 100.00% 0.00 0.00 10.02 1,000.00 3.80 3,800.00 76.00 0.12 465.12 4,659.57 465.12 4,194.45
8+000.00 9+000.00 F-1 17.518 100.00% 0.00 0.00 9.02 1,000.00 4.59 4,590.00 91.80 0.12 561.82 5,066.46 561.82 4,504.64
9+000.00 10+000.00 F-1 17.518 100.00% 0.00 0.00 8.02 1,000.00 4.90 4,900.00 98.00 0.12 599.76 4,808.88 599.76 4,209.12
10+000.00 11+000.00 F-1 17.518 100.00% 0.00 0.00 7.02 1,000.00 4.50 4,500.00 90.00 0.12 550.80 3,865.51 550.80 3,314.71
11+000.00 12+000.00 F-1 17.518 100.00% 0.00 0.00 6.02 1,000.00 3.20 3,200.00 64.00 0.12 391.68 2,357.13 391.68 1,965.45
12+000.00 13+000.00 F-1 17.518 100.00% 0.00 0.00 5.02 1,000.00 4.00 4,000.00 80.00 0.12 489.60 2,456.81 489.60 1,967.21
13+000.00 14+000.00 F-1 17.518 100.00% 0.00 0.00 4.02 1,000.00 3.80 3,800.00 76.00 0.12 465.12 1,868.85 465.12 1,403.73
14+000.00 15+000.00 F-1 17.518 100.00% 0.00 0.00 3.02 1,000.00 4.50 4,500.00 90.00 0.12 550.80 1,662.31 550.80 1,111.51
15+000.00 16+000.00 F-1 17.518 100.00% 0.00 0.00 2.02 1,000.00 4.00 4,000.00 80.00 0.12 489.60 988.01 489.60 498.41
16+000.00 17+000.00 F-1 17.518 100.00% 0.00 0.00 1.02 1,000.00 4.50 4,500.00 90.00 0.12 550.80 560.71 550.80 9.91
17+000.00 18+000.00 F-1 17.518 100.00% 0.00 0.00 0.02 1,000.00 4.80 4,800.00 96.00 0.12 587.52 10.58 10.58 -
18+000.00 19+000.00 F-1 17.518 100.00% 0.00 0.00 0.98 1,000.00 4.00 4,000.00 80.00 0.12 489.60 480.79 480.79 -
19+000.00 20+000.00 F-1 17.518 100.00% 0.00 0.00 1.98 1,000.00 3.78 3,780.00 75.60 0.12 462.67 917.02 462.67 454.34
20+000.00 21+000.00 F-1 17.518 100.00% 0.00 0.00 2.98 1,000.00 4.50 4,500.00 90.00 0.12 550.80 1,642.49 550.80 1,091.69
21+000.00 22+000.00 F-1 17.518 100.00% 0.00 0.00 3.98 1,000.00 4.50 4,500.00 90.00 0.12 550.80 2,193.29 550.80 1,642.49
22+000.00 23+000.00 F-1 17.518 100.00% 0.00 0.00 4.98 1,000.00 3.80 3,800.00 76.00 0.12 465.12 2,317.23 465.12 1,852.11

23+000.00 24+000.00 F-2 27.511 100.00% 0.00 0.00 4.01 1,000.00 3.82 3,820.00 76.40 0.12 467.57 1,875.42 467.57 1,407.85
24+000.00 25+000.00 F-2 27.511 100.00% 0.00 0.00 3.01 1,000.00 4.20 4,200.00 84.00 0.12 514.08 1,547.89 514.08 1,033.81
25+000.00 26+000.00 F-2 27.511 100.00% 0.00 0.00 2.01 1,000.00 3.00 3,000.00 60.00 0.12 367.20 738.44 367.20 371.24
26+000.00 27+000.00 F-2 27.511 100.00% 0.00 0.00 1.01 1,000.00 4.00 4,000.00 80.00 0.12 489.60 494.99 489.60 5.39
27+000.00 28+000.00 F-2 27.511 100.00% 0.00 0.00 0.01 1,000.00 3.20 3,200.00 64.00 0.12 391.68 4.31 4.31 -

28+000.00 29+000.00 F-3 28.282 100.00% 0.00 0.00 0.22 1,000.00 3.50 3,500.00 70.00 0.12 428.40 93.39 93.39 -
29+000.00 30+000.00 F-3 28.282 100.00% 0.00 0.00 1.22 1,000.00 3.20 3,200.00 64.00 0.12 391.68 477.07 391.68 85.39
30+000.00 31+000.00 F-3 28.282 100.00% 0.00 0.00 2.22 1,000.00 3.00 3,000.00 60.00 0.12 367.20 814.45 367.20 447.25
31+000.00 32+000.00 F-3 28.282 100.00% 0.00 0.00 3.22 1,000.00 3.00 3,000.00 60.00 0.12 367.20 1,181.65 367.20 814.45
32+000.00 33+000.00 F-3 28.282 100.00% 0.00 0.00 4.22 1,000.00 3.00 3,000.00 60.00 0.12 367.20 1,548.85 367.20 1,181.65
33+000.00 34+000.00 F-3 28.282 100.00% 0.00 0.00 5.22 1,000.00 3.40 3,400.00 68.00 0.12 416.16 2,171.52 416.16 1,755.36
34+000.00 35+000.00 F-3 28.282 100.00% 0.00 0.00 6.22 1,000.00 3.40 3,400.00 68.00 0.12 416.16 2,587.68 416.16 2,171.52
35+000.00 36+000.00 F-3 28.282 100.00% 0.00 0.00 7.22 1,000.00 3.00 3,000.00 60.00 0.12 367.20 2,650.45 367.20 2,283.25
MANTENIMIENTO PERIODICO RUTA JU-114 EMP. PE-24 A (CALABAZA) - APALLA CALABAZA - ULLIMARCA - BADOPAMPA - HUANCAMACHAY - UNION PROGRESO - MANZANAYO - SAN IGNACIO - PUCACOCHA -
EMP. JU-108 (MATAPA)

: MANTENIMIENTO PERIODICO RUTA JU-114 EMP. PE-24 A (CALABAZA) - APALLA CALABAZA - ULLIMARCA - BADOPAMPA - HUANCAMACHAY - UNION PROGRESO - MANZANAYO - SAN IGNACIO -
PROYECTO
PUCACOCHA - EMP. JU-108 (MATAPA)
RUTA : JU - 114
ACTIVIDAD: : 03.00 TRANSPORTE
FECHA: : NOVIEMBRE 2017
Sustento de metrados de transporte de Agua
Calculo de la Distancia Media de Transporte FUENTE AGUA ACCESO

Fuente 1: 0.00

27+511.05

50+903.20
43+083.81
0
17+518.8

28+282.00

52+355
Fuente 2: 0.00
0+000

FUENTE DE AGUA N°1 FUENTE DE AGUA N°2 FUENTE DE AGUA N°3 FUENTE DE AGUA N°4 FUENTE DE AGUA N°6 Fuente 3: 0.00
E
c Fuente 4: 0.00
u
a Fuente 5: 0.00
o c
i tramo
Tram ó
Inicio n PAVIMENTOS Fin de

E Código Fte. Ubicación de Fte. Participación D.L.P. 120.00 Espesor Momento D<=1km (m3- D>1km (m3-
INICIO (km) FIN (km) Acceso (km) Distancia (km) Longitud (m) Ancho (m) Área (m2) SA (m2) Volumen (m3)
m Agua agua (km) % m (km) (m) (m3-km) km) km)
p
36+000.00 37+000.00 a F-4 43.083 100.00% 0.00 0.00 6.58 1,000.00 3.00 3,000.00 60.00 0.12 367.20 2,417.28 367.20 2,050.08
l
37+000.00 38+000.00 m F-4 43.083 100.00% 0.00 0.00 5.58 1,000.00 3.00 3,000.00 60.00 0.12 367.20 2,050.08 367.20 1,682.88
38+000.00 39+000.00 e F-4 43.083 100.00% 0.00 0.00 4.58 1,000.00 3.20 3,200.00 64.00 0.12 391.68 1,795.07 391.68 1,403.39
39+000.00 40+000.00 F-4 43.083 100.00% 0.00 0.00 3.58 1,000.00 3.50 3,500.00 70.00 0.12 428.40 1,534.96 428.40 1,106.56
(
40+000.00 41+000.00 m F-4 43.083 100.00% 0.00 0.00 2.58 1,000.00 3.00 3,000.00 60.00 0.12 367.20 948.48 367.20 581.28
41+000.00 42+000.00 ) F-4 43.083 100.00% 0.00 0.00 1.58 1,000.00 4.43 4,430.00 88.60 0.12 542.23 858.35 542.23 316.12
42+000.00 43+000.00 F-4 43.083 100.00% 0.00 0.00 0.58 1,000.00 3.63 3,630.00 72.60 0.12 444.31 259.03 259.03 -
43+000.00 44+000.00 F-4 43.083 100.00% 0.00 0.00 0.42 1,000.00 3.80 3,800.00 76.00 0.12 465.12 193.96 193.96 -
44+000.00 45+000.00 F-4 43.083 100.00% 0.00 0.00 1.42 1,000.00 4.00 4,000.00 80.00 0.12 489.60 693.76 489.60 204.16
45+000.00 46+000.00 F-4 43.083 100.00% 0.00 0.00 2.42 1,000.00 3.20 3,200.00 64.00 0.12 391.68 946.69 391.68 555.01
46+000.00 47+000.00 F-4 43.083 100.00% 0.00 0.00 3.42 1,000.00 2.80 2,800.00 56.00 0.12 342.72 1,171.07 342.72 828.35

47+000.00 48+000.00 F-5 50.903 100.00% 0.00 0.00 3.40 1,000.00 4.00 4,000.00 80.00 0.12 489.60 1,666.11 489.60 1,176.51
48+000.00 49+000.00 F-5 50.903 100.00% 0.00 0.00 2.40 1,000.00 3.80 3,800.00 76.00 0.12 465.12 1,117.68 465.12 652.56
49+000.00 50+000.00 F-5 50.903 100.00% 0.00 0.00 1.40 1,000.00 4.50 4,500.00 90.00 0.12 550.80 772.77 550.80 221.97
50+000.00 51+000.00 F-5 50.903 100.00% 0.00 0.00 0.40 1,000.00 4.50 4,500.00 90.00 0.12 550.80 221.97 221.97 -
51+000.00 52+000.00 F-5 50.903 100.00% 0.00 0.00 0.60 1,000.00 4.00 4,000.00 80.00 0.12 489.60 292.29 292.29 -
52+000.00 52+355.00 F-5 50.903 100.00% 0.00 0.00 1.27 355.00 4.50 1,597.50 31.95 0.12 195.53 249.21 195.53 53.67
LONGITUD TOTAL DE AFIRMADO 52,355.00 24,149.21 114,154.49 21,858.50 92,295.97

Dist.Media (km): 4.73


EXPEDIENTE TECNICO:

MANTENIMIENTO PERIODICO RUTA JU-114 EMP. PE-24 A (CALABAZA) - APALLA CALABAZA - ULLIMARCA - BADOPAMPA - HUANCAMACHAY - UNION
PROGRESO - MANZANAYO - SAN IGNACIO - PUCACOCHA - EMP. JU-108 (MATAPA)

CÁLCULO DE RENDIMIENTOS DE TRANSPORTES


PARTIDA - INSUMO TRANSPORTE DE MATERIAL GRANULAR DE CANTERA <= 1.00 KM
Unidad M3-KM
Rendimiento 391.80 M3/DIA
DATOS GENERALES
Velocidad Cargado 35.00 km/hr
Velocidad Descargado 40.00 km/hr
Tiempo de Viaje Cargado (Tc) ###
Tiempo de Viaje Descargado (Td) 1.5 x d
Volumen de la Tolva del Volquete (a) 15.00 m3
Distancia de transporte 1.00 km

CALCULO DE RENDIMIENTOS
Tiempo de Carguío al Volquete Tcv 8.57 min
Tiempo de Descarga del Volquete Tdv 2.00 min
Tiempo Útil : 8 hrs. x 90.00% (b) 432 min

Tiempo de Ciclo del Volquete Tciclo = Tcv+Tdv+Tc+Td 10.57 + 3.21 x d

Para d= 1.00 km, Ciclo= (c) 13.79 min


Numero de ciclos (d) = (b) / (c) 31.34
Volumen Transportado por el Volquete (e) = (a) x (d) 470.1 m3/dia
Cargador s/llantas 125-155HP, 3 y3 Rend = 840.00 m3/dia

RENDIMIENTO PARA UNA DISTANCIA "d" : d = 1.00 Km Esponjamiento= 1.20


Rendimiento = 391.75 m3

PARTIDA - INSUMO TRANSPORTE DE MATERIAL GRANULAR DE CANTERA > 1.00 KM


Unidad M3-KM
Rendimiento 317.80 M3/DIA
DATOS GENERALES
Velocidad Cargado 35.00 km/hr
Velocidad Descargado 40.00 km/hr
Tiempo de Viaje Cargado (Tc) ###
Tiempo de Viaje Descargado (Td) 1.5 x d
Volumen de la Tolva del Volquete (a) 15.00 m3
Distancia de transporte 5.29 km
CALCULO DE RENDIMIENTOS
Tiempo Útil : 8 hrs. x 90.00% (b) 432 min
Tiempo de Ciclo del Volquete Tciclo = Tc+Td 3.21 x d
Para d= 1.00 km, Ciclo= (c) 16.99 min
Numero de ciclos (d) = (b) / (c) 25.42
Volumen Transportado por el Volquete (e) = (a) x (d) 381.3 m3/dia
Cargador s/llantas 125-155HP, 3 y3 Rend = 840.00 m3/dia

RENDIMIENTO PARA UNA DISTANCIA "d" : d = 5.29 Km Esponjamiento= 1.20


Rendimiento = 317.75 m3

PARTIDA - INSUMO TRANSPORTE DE AGUA PARA AFIRMADO


Unidad M3
Rendimiento 65.18 M3/DIA
DATOS GENERALES
Velocidad Cargado 35.00 km/hr
Velocidad Descargado 40.00 km/hr
Tiempo de Viaje Cargado (Tc) ###
Tiempo de Viaje Descargado (Td) 1.5 x d
Capacidad de la Cisterna del Camión (a) 2000.00 gal
Distancia de transporte 4.73 km

CALCULO DE RENDIMIENTOS
Tiempo de Llenado Tcv 10.00 min
Tiempo de Vaciado Tdv 25.00 min
Tiempo Útil : 8 hrs. x 90.00% (b) 432 min
Tiempo de Ciclo del Volquete Tciclo = Tcv+Tdv+Tc+Td 35 + 3.21 x d
Para d = 4.73 Km, Ciclo = (c) 50.19 min
Numero de ciclos (d) = (b) / (c) 8.61
Volumen Transportado por la Cisterna (e) = (a) x (d) 65.18 m3/dia

RENDIMIENTO PARA UNA DISTANCIA "d" : d = 4.73 Km

Rendimiento = 65.18 m3